Summarry
This guidaance docume
ent outlines details relatiing to the Peearl Building Rating Systeem (PBRS), RER1:
R
in order to facilitate com
Minimum
m Energy Perfformance, Prrescriptive Methodology,
M
mpliance with the
credit req
quirements. The Prescriptive Method is based upo
on selected requirements
r
s in the Abu Dhabi
Internatio
onalEnergyConservationC
Code(ADIEC
CC),version1..0asissuedb
byDMAJanuaary2011.

ThisPresccriptiveMethodologyisap
pplicabletobuildingswithagrossinterrnalfloorareaa(GIFA)of50
000m
orless.B
Buildingprojectsthatexceed5000man
ndwishtoun
ndertaketheprescriptiveccomplianceo
option
shouldap
pproachtheEstidamateam
mattheUPCpriortocomm
mencingthed
designsubmission.

ument provid
des a summaary of the requirements relating
r
to envelope, systtems, lightingg and
This docu
renewableswithinthePrescriptiveapproachforrbuildings.

An Estidaama Buildings Energy Preescriptive Patthway tool is to be provvided in conjjunction with


h this
guidancenotetoaidin
ndocumentin
ngcompliancee.

Requirements
The Presccriptive requirements are based upon an alignmen
nt with the ADIECC
A
wherre applicable.. It is
intended tosetahigherstandardo
ofperforman
ncethantheP
Performance Approachinordertoenssurea
suitably stringent targget for energyy usage and to enable an
n appropriatee level of imp
provement beeyond
theBaseliinerequirements.Therefforethemajo
orityofthetaargetvaluesw
withinthisguidancearesu
ubject
toa10%iimprovementtoverthevaluesgiveninttheADIECC.

ThePresccriptiveAppro
oachwilloutliinetargetperrformancefor
Buildin
ngEnvelope((incl.glazing)
HVACsystems
Service
eHotWater((SHW)
Lightin
ng(internal&
&external)
Renew
wables

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

BuildingEEnvelope
The follow
wing target performance
p
values are the
t mandateed upper limits for each building envvelope
element type.
t
For en
nvelope elemeents not coveered by the following
f
tables please ref
efer to ADIEC
CC for
furtherdeetails.
OpaqueFFabricUvalue
es(W/m2.K)(C
ClimateZonee1):

General
"R
Residential"
Ro
oof:
Inssulationentirrelyabovedeck
0
0.20
0.20
Me
etalbuildingss
0
0.33
0.33
Atticandother
0
0.17
0.14
Wall,AboveGrrade:
Maass
0
0.30
0.30
1
Me
etalbuildingss
0
0.48
0.48
Me
etalframed
0
0.19
0.19
Woodframedaandother
0
0.18
0.18
Wall,BelowGrradeCfactor,,W/m.K:
Be
elowgradewaall
5
5.83
5.83
Flo
oorsUvalue,,W/m.K:
Maass
1
1.65
1.65
Joiist/Framing
1
1.44
1.44
SlaabonGradeFloorsFfactor,W/m.K:
Un
nheatedslabss(F)
3
3.73
3.73
He
eatedslabs(FF)
5
5.21
5.21

Building Air
A Leakage: building shaall be tested as per ASTM
M E779 and should not exceed
e
3.64l/s/m2
@75Pabaaseduponthe
eareaofexposedfaade.

Uvalues(W/m
m2.K)(ClimateeZone1):
VerticalFeenestrationU
VerticalG
Glazing(Maxx30%aboveggradewallarrea)
Framingmaterialsotherthanmettal
Uvalue
MetalFrraming

2.0
00

Curtainw
wall/storefron
nt
Entranceedoor
Allotherr

1.9
90
2.6
60
1.9
90

ASHRAE90.1definition:acompleteinteggratedsetofmuttuallydependen
ntcomponentsaandassembliestthatformabuild
ding,
whichconsistsofasteelfraamedsuperstrucctureandmetalskin

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

Solar Heaat Gain Coeffficient (SHGC), accountingg for Projectio


on Factor2 (P
PF) of externaal shading deevices
(seeIECCsection502.3
3):
SHGCallfframetypes
PF<0.25
0
0.23
0.25PF<<0.50
0
0.30
PF0.50
0
0.36

TheconsiderationofP
ProjectionFacctorallowsfo
oranadjustm
menttothereequiredSHGC
Cperformancedue
to the beeneficial effecct of providin
ng shading to
o vertical glazzing. The pro
ojection facto
or is calculatted as
follows:

PF=A/B

A=Distancem
measuredhorizontallyfrom
mthefurthesttcontinuousextremityofanyoverhangg,
eaave,orpermaanentlyattachedshadingdevicetotheeverticalsurfaaceoftheglaazing
B=Distancem
measuredvertticallyfromth
hebottomoftheglazingto
otheundersiideofthe
ovverhang,eave,orpermanentlyattacheedshadingdeevice

Skylightp
performance:
Skylight(M
Max3%roofaarea)
Uvalue(W
W/m.K)
SHGC

3.80
0.30

HVACSysstemsEfficien
ncy:
All on sitte cooling systems shall be
b air cooled
d only. Watter based co
ooling system
ms are required to
undertakeeassessmenttviatheRER1PerformancceApproach.
The follow
wing tables outline
o
the minimum
m
perrmissible seasonal system
m efficiency for
f various syystem
types. Th
he target effficiency quoteed is based upon perform
mance underr standard teest conditions and
procedurees as outline
ed by AHRI standards sp
pecific to eacch system tyype. The peerformance of
o air
conditioning equipme
ent accordingg to the reelevant AHRI standard should be ob
btained from
m the
ntmanufacturer.
equipmen

SeeIntern
nationalEnergyC
ConservationCo
ode,Section502.3.2

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

NotethatttheAHRIteststandardsaretoratee
energyperforrmanceaccorrdingtospeciificcondition
nsand
procedure
esandshoulld not be use
edfordesign
n purposesassthetestco
onditionsinn
no wayreflecct the
designconditionsofth
helocalclimaate.

Inthesub
bsequenttablesthefollow
wingunitsapp
ply:
SEEER/EER=Btu/Wh
SC
CoP/CoP=un
nitless
IP
PLV=Btu/Wh
h

UnitaryAirConditioners,VRF,Split(&multisplitt)units:
Equip
pmentType

SizeCateggory
<19kW

Airco
onditioners,
Airco
ooled

>19kW
and<40kW
W
>40kW
and<70kW
W
>70kW
and<223kW
>223kW

Throu
ughthewall,
Airco
ooled

<9kW
<19kW

>19kW
Airco
onditioners,
and<40kW
W
Waterand
>40kW
evapo
orativelycooled
and<70kW
W
>70kW
and<223kW

Subcategoryor
RatingCondition
Splitsyystem
Singlep
package
Splitsyystemand
singlep
package
Splitsyystemand
singlep
package
Splitsyystemand
singlep
package
Splitsyystemand
singlep
package
Splitsyystem
Singlep
package
Splitsyystemand
singlep
package
Splitsyystemand
singlep
package
Splitsyystemand
singlep
package
Splitsyystemand
singlep
package

IPLVsareo
onlyapplicablettoequipmentw
withcapacitymod
dulation

Minimum
mEfficiency3
13.0SEER
13.0SEER

3.81SCoP
3.81SCoP

11.2EER

3.28CoP

11.0EER

3.22CoP

10.0EER
9.7IPLV
9.7EER
9.4IPLV
12.0SEER
12.0SEER

2.93CoP
9.7IPLV
2.84CoP
9.4IPLV
3.52SCoP
3.52SCoP

12.1EER

3.55CoP

11.5EER

3.37CoP

11.0EER

3.22CoP

11.5EER

3.37CoP

Test
Procedure
AHRI
210/240

AHRI
340/360

AHRI
210/240
AHRI
210/240

AHRI
340/360

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

Condensin
ngUnits:
EquipmentType

SizeCateggory
<19kW

Aircooled,(Cooling
mode)

>19kW
and<40kW
W
>40kW
and<70kW
W
>70kW

Throu
ughtheWall
(Airco
ooled,cooling
mode)

<9kW

Subcateegoryor
RatingCondition
Splitsystem
Singlep
package
Splitsystemand
singlep
package
Splitsystemand
singlep
package
Splitsystemand
singlep
package
Splitsystem
Singlep
package

Minimum
mEfficiency
13.0SEER
13.0SEER

3.81SCoP
3.81SCoP

11.0EER

3.22CoP

10.6EER

3.11CoP

9.5EER
9.2IPLV
12.0SEER

2.78CoP
9.2IPLV
3.52SCoP

12.0SEER

3.52SCoP

Test
Procedure
AHRI
210/240

AHRI
340/360
AHRI
210/240

PackagedTerminalAirConditionerss(PTAC)&PaackagedTerm
minalHeatPum
mps(PTHP):
Equipm
mentType
PTAC(Cooling
mode)
PTHP(Cooling
mode)

SiizeCategory
(Input)
Allcapacities
Allcapacities

Subcatego
oryor
RatingCon
ndition
95Fdbou
utdoorair
95Fdbou
utdoorair

MinimumEfficiency4
12.5(0.213*Cap/1000)EER
12.5(0.213*Cap/1000)EER

Test
Procedurre
AHRI
310/380
0
AHRI
310/381
1

Aircooled
dchillers:
Equipm
mentType

SizeCategory

Aircoo
oledchillers

<150tonss
>150tonss

Aircoo
oledwithout
condenser,electrical
operatted

Allcapacitties

Minim
mumEfficiencyy
FullLo
oad,EER
Fu
ullLoad,CoP
IPLV
>9
9.562
>2.803
>12.500
>9
9.562
>2.803
>12.750
Airco
ooledchillersw
withoutcondensersmustbe
ratedw
withmatchingcondensersan
ndcomplywith
h
theaircooledchillerefficiencyrrequirements

Test
Procedurre
AHRI
550/590
0

HVACSysstemsPerform
mance:
HVACsysttemcontrolsshallbeprovvidedasfollow
ws:
Eaach zone shaall be contro
olled by indivvidual therm
mostatic controls capable of responding to
teemperaturew
withinthezon
ne
Where
W
humidification is provided, at leeast one hum
midity contro
ol device shall be provideed for
eaachhumidity controlsysteem
Proprietarycontrolsystemssmustbeuseed

Capmean
nstheratedcoolingcapacityofttheproductinBttu/h.Iftheunitscapacityislesssthan7,000Btu
u/h,use7,000Bttu/hin
thecalculation.Iftheunitscapacityisgreaaterthan15,000
0Btu/h,use15,0
000Btu/hinthecalculation

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

Energy reecovery syste


ems are required for all systems wherre the design
n supply flow
w rate exceed
ds the
specifiedvalueattheggivenpercenttageofoutdo
oorairasdetaailedinthefo
ollowingtablee:

PercentaggeOutdoorAirratFullDesign
nFlowRate
DesignSu
upplyFanAirflo
owRate

m/s

>30%
&<40%

>40
0%&
<5
50%

n/a

n
n/a

>50%&
& >60%& >70%&
<60%
%
<70%
<80%
11.04
4

5.10

2.12

>8
80%
1.70

The energgy recovery system mustt achieve a minimum


m
of 55% effectiveeness based on the chan
nge in
enthalpy oftheoutdoorairsupply..Exceptions tothisrequirementared
detailedintheeADIECC,Seection
503.2.6

DemandC
ControlVentilation(DCV)mustbeinco
orporatedinthemechanicalventilation
nsystemdesiggnfor
allzonesllargerthan50
0mwithanaaverageoccupantdensityexceeding2.3
3m/person.

nce for each


h system mu
ust conform with the reelevant requiirement from
m the
Fan poweer performan
followingtable:
SyystemType
Centralmechan
nicalventilation
n,incl.heatingg&cooling
Zo
onalsupplysysstemwherefanisremotefro
omzone,
i.e
e.ceilingorroofmounted
Zo
onalextractsyystemwherefaanisremotefromzone
Zo
onalsupply&eextractventilation unitssuch
hasceiling
vo
oidorroofunittsservingsingleroom/zonew
withheat
re
ecovery
Lo
ocalsupply&eextractventilattion unitssuch
has
wall/roofunitss
w
servingsinglerroom/zonewitthheat
re
ecovery
Lo
ocalsupply&eextractventilattion unitssuch
has
window/wall/ro
w
oofunitsservin
ngsinglearea((e.g.toilet
exxtract)
Otherlocalvent
O
tilationunits
FaanassistedterrminalVAVunit
Faancoilunits(w
weightedaveraage)

Maximum
SFP,W/l/s
1.8
1.2
0.6
2

1.8

0.4
0.6
1.2
0.6

Thefollow
wingrequirem
mentsmustalsobesatisfieedwhereapp
plicable:
AllCHWpump
pmotorsshallbefittedwitthvariablesp
peeddrives
Allductslocate
edinunconditionedspaceesshallbeinssulatedwithaaminimumoffR5insulatio
on
Allductslocate
edinexternalspacesshalllbeinsulated
dwithaminim
mumofR8in
nsulation
Allpipingservingaspartoffacoolingsysstemshallbethermallyinssulatedwithaminimum3
38mm
in
nsulation(bassedoninsulattionthermalcconductivityo
oflessthan0
0.039W/m.K)

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

ServiceHotWater
ply with the performancee requiremen
nts detailed in the
All electriic water heatting systems are to comp
following table.Perfo
ormanceisgiveneitherassaminimumEnergyFactor(EF)oram
maximumStaandby
dependanton
nthevolumeofthesystem
m(inlitres).
Loss(SL)d

SizeCategory(Input)
<12kW
>12kW
<24amps
and<250vo
olts

Su
ubcategoryor
RaatingCondition
n
Reesistance
Reesistance

Minimum
mEfficiency

TestProcedure

0.970.00
00349V,EF
0.134V+45.4SL,W

DOE10CFRPaart430
ANSIZ21.10.3

Heeatpump

0.970.00
00349V,EF

DOE10CFRPaart430

on to the gen
neration system performaance the follo
owing requirrements must also be sattisfied
In additio
whereapplicable:
dtoallowassetpointof4
43Cfordwellingsand32Cfor
Teemperatureccontrolsmusttbeprovided
ottheroccupan
ncies
Outlettemper
O
ratureinpublicrestroomssmustnotexceed43C
Sw
wimming poo
ol, spa or ho
ot tub heatin
ng or coolingg systems shaall be equipp
ped with a reeadily
acccessible onoff switch to
o allow shuttting off the system with
hout adjustin
ng the therm
mostat
seetting
Allpoolsshallbeequippedwithavapou
urretardantp
poolcoveronoratthewattersurface
ools, spas orr hot tubs which are heated to more than 32C shall
s
have a pool cover with
w a
Po
m
minimuminsu
ofR12
lationvalueo
InternalLLighting:
All internal lighting syystems are to
o have a ligh
hting power density less than the tarrget value fo
or the
relevantzzonetypeintthefollowingtable:

BuildingA
AreaType
ActiveSto
orage
AtriumFirstThreeFlo
oors
AtriumEachAdditionalFloor
AUTOMO
OTIVEFACILITY
Classroom
m/lecture/train
ning
Conferen
nce/Meeting/M
Multipurpose
Corridor//Transition
Electrical/Mechanical
FoodPreparation
InactiveSStorage

LIGHTING
GPOWERDENSITY
Whole Spaceby
Building
Space
(W/m2) (W/m2)
(
BuildingAreaTypee

7.8 Card
dFile&Cataloguing

5.8 ReadingArea
MAN
NUFACTURING
G

1.9
FAC
CILITY
8.7
MOTTEL

12.6 DiningArea

10.7 Gueestquarters

4.8 Receeption/Waitingg
MOTTIONPICTURE

10.7
THEEATER

11.6 Aud
dience/SeatingArea

1.9 Lobby

Whole Spacceby
Building
S
Space
(W
W/m2)
(W//m2)

10.7

11.6
12.6

9.7

11.6
10.7
20.3

11.6

11.6
9.7

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

Lobby
Restroom
m
Stairway
CONVENTTIONCENTER
ExhibitSp
pace
Audiencee/SeatingArea
COURTHO
OUSE
Audiencee/SeatingArea
Courtroom
Confinem
mentCells

11.6

11.6

10.7
7.8
5.8

12.6
8.7

8.7
18.4
8.7

12.6

12.6

5.8

13.6

DINING:C
CAFETERIA/FASTFOOD
DINING:FFAMILY
Dining
Kitchen
DORMITO
ORY
LivingQu
uarters
Bedroom
m
StudyHall
EXERCISEECENTER
Dressing//Locker/FittinggRoom
Audiencee/SeatingArea
ExerciseA
Area
ExerciseA
Area/Gymnasium

13.6
15.5

9.7

9.7

13.6
11.6

10.7
4.8
13.6

5.8
2.9
8.7
8.7

GYMNASIUM

10.7

Dressing//Locker/FittinggRoom

5.8

Audiencee/SeatingArea

3.9

PlayingA
Area

13.6

ExerciseA
Area

8.7

9.7

9.7
14.5
26.2
7.8
13.6
5.8

JudgesCh
hambers
Dressing//Locker/FittinggRoom
DINING:B
BARLOUNGE/LEISURE
Lounge/LLeisureDining

HEALTHC
CARECLINIC
Corridorssw/patientwaiting,exam
Exam/Treeatment
Emergency
Public&SStaffLounge
Hospital//Medicalsupplies
HospitalNursery

MULTIFAMILY
MUSSEUM
ActiveStorage
Gen
neralexhibition
n
Resttoration
OFFICE
Encllosed
OpeenPlan
PAR
RKINGGARAGEE
PEN
NITENTIARY
PERFORMINGARTTS
THEEATER
Aud
dience/SeatingArea
Lobby
Dresssing/Locker/FFitting
Roo
om
POLLICESTATIONS
FIREESTATIONS
FireStationEngineeRoom
SleeepingQuarters
Aud
dience/SeatingArea
PoliceStationLabo
oratory
POSSTOFFICE/SF
SorttingArea
Lobby
RELIIGIOUSBUILDINGS
Lobby
Worrship/Pulpit/Ch
hoir
RETA
AIL
Dep
partmentStoreeSales
Areaa
SpeccialtyStoreSalesArea
FineeMerchandiseSales
Areaa
SupermarketSalessArea
PerssonalServicesSales
Areaa
MasssMerchandisiingSales
Areaa
MallConcourse
RETA
AIL:SPECIALTYY
RETA
AIL:SUPERMA
ARKET
SCHOOL/UNIVERSSITY
Classsroom
Aud
dience

6.8
10.7

8.7

2.9
9.7

7.8
9.7
16.5

9.7
9.7

15.5

25.2
32.0

10.7

9.7
7.8

10.7

12.6

12.6

7.8
2.9
7.8
13.6

11.6
9.7

5.8
23.3

12.6

17.4

28.1

12.6

12.6

12.6

15.5
12.6
11.6

16.5

12.6
6.8

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

Nursestaation
Physicalttherapy
PatientRoom
Pharmacyy
Hospital//Radiology
OperatinggRoom
Recoveryy
Activesto
orage
LaundryW
Washing
HOTEL
DiningArrea
Guestquarters
Reception
n/Waiting
Lobby
LIBRARY
LibraryA
AudioVisual
Stacks

9.7

12.6

9.7
8.7
6.8
11.6
3.9
21.3
7.8
8.7
5.8

12.6
10.7
24.2
10.7

6.8
16.5

Dining
Office
Corrridor
Storrage
Labo
oratory
TOW
WNHALL
TRA
ANSPORTATION
N
DiningArea
BagggageArea
Airp
portConcoursse
Term
minalTicketC
Counter
Receeption/Waitingg
SPO
ORTSARENA
WAREHOUSE
FineeMaterial
Med
dium/BulkyMaaterial
WORKSHOP

10.7
9.7

10.7
5.8

13.6

10.7
10.7
4.8
4.8
10.7

20.3
9.7
5.8
14.5
4.8

13.6
5.8

Thefollow
wingsensorsandcontrolsarerequiredtobeprovideedasnoted:
Liight reductio
on controls: occupant controls to reduce
r
the connected
c
liighting load in a
reeasonablyuniformilluminationpattern
nbyatleast5
50percent
Daylightzone control:provvideindividuaalsensor/con
ntrolthatcon
ntrolstheligh
htsindependeentof
geeneralarealighting.Eachdaylightconttrolzoneshallnotexceed232m
Occupancysen
O
nsors:installeedinallclassrooms,confeerence/meetingrooms,em
mployeelunchand
breakrooms, privateofficees,restroomss,storageroo
oms,janitorialclosetsand otherzones 28m
orlessenclose
edbyceilingh
heightpartitio
ons.Devicesmustbeproggrammedtoautomaticallyyturn
offflightswithin15minutessofalloccupaantsleavingthespace
Tiime clock co
ontrols: in zo
ones not con
ntrolled by occupancy
o
seensors, autom
matic time switch
s
co
ontroldevicesshallbeuseed,incorporattingoverridedevices
Sp
pecificapplicationcontrols:dedicatedccontrolsforthefollowingapplications
o Displayy/accentlightting
o Hotelgguestroomliighting
o Tasklighting
o Nonvisuallighting
o Demonstrationligh
hting

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

TradableSurfaces

ExternalLLighting:
The total exterior ligh
hting power for
f the buildiing is to be less than thee sum of the individual ligghting
powerdeensitiespermiittedforthe relevantapp
plicationsconsidered.Tradeoffsarep
permittedbettween
theappliccationslisted undertheTrradableSurfaacessection. Allexternal lightingapplicationsundeerthe
NontradaableSurfacesmustcomplyywiththeligh
htingpowerd
densityspeciffied.
Application
ns
Uncovere
edParkingAreeas
ParkkingLotsandd
drives
BuildingGrounds
Walkwaysless
W
than3metreswide
Walkways3met
W
treswideorgrreater
Stairrways
BuildingEntrancesandExits
Mainen
ntries
Otherd
doors
CanopiessandOverhanggs
Canopies(freestandin
ngandattached
dand
overhangs)
OutdoorSales
Open
nareas(includingvehiclesaleelots)
Stree
etfrontageforvehiclesaleslo
otsin
additionto"op
a
penarea"allow
wance

LightingPo
owerDensitiess

1.45
5 W/m2
2.95
5 W/linearmetre
1.94
4 W/m2
9.69
9 W/m2
88.6
6 W/linearmetreofdoorw
width
59.1
1 W/linearmetreofdoorw
width
12.1
1 W/m2
4.84
4 W/m2
59.1
1 W/linearmetre
1.94
4

BuildingFaccades
NonTradableSurfaces

14.8
8
Auto
omatedtellermachinesandnight
deposittories

243.0
0
81.0
0

Enttrancesandgaatehouseinspeection
stationsaatguardedfaccilities

12.1
1

Loadingareasforlaw
wenforcementt,fire,
ambulaanceandotherremergencyseervice
veh
hicles

4.84
4

Driveupwindowsatfaastfoodrestau
urants
Parkkingnear24ho
ourretailentraances

360.0
0
720.0
0

W/m2foreeachilluminateedwallor
surfaceor
W/linearmeterforeach
illuminatedwallorsurfacelength
Wperlocattionand
WperaddittionalATMperrlocation
W/m2ofun
ncoveredarea(covered
areasarein
ncludedinthe"Canopies
andOverhaangs"sectiono
of
"TradableSSurfaces")
W/m2ofun
ncoveredarea(covered
areasarein
ncludedinthe"Canopies
andOverhaangs"sectiono
of
"TradableSSurfaces")
Wperdriveethrough
Wpermain
nentry

Thefollow
wingsensorsandcontrolsshallbeprovvidedforallexxteriorlightin
ngapplication
ns:
Automaticcon
ntrolscapableeofturningoffexteriorligghtingwhenssufficientdayllightisavailableor
w
whenthelight
tingisnotreq
quiredduringnighttimeho
ours

10

PBRS RE-R
R1 Energy
y Prescrip
ptive Pathway

Da
ate: July 2011
2

Renewab
bleTechnologies:
Allofficebuildingsaretoincludeassolarthermallhotwatergeenerationsysstemcapableofgeneratingg
otalannualho
otwaterdem
mand.Thesollarthermalsyystemistobeefullyintegraated
50%ofthebuildingsto
buildingsservvicehotwatersystem.
withtheb
Thereisn
norequirementtoproviderenewableteechnologiesfforotherbuildingtypes.