1.0
GENERAL
1.1
DESCRIPTION
.1
1.2
WORKS INCLUDED
.1
1.3
SUBMITTALS
.1
1.4
The works under this section include supply, delivery, installation, testing
and commissioning of the Building Control System interface.
QUALITY ASSURANCE
.1
2.0
PRODUCTS
2.1
GENERAL
.1
.2
Distributed DDC local controllers, field sensors, field devices, etc. shall be
supplied and installed by the BCS Contractor to meet the requirements of
the respective services.
.3
.4
For BCS cabling works to the interfacing panels and marshalling kiosks,
the BCS Contractor shall terminate the cables to the terminal strips
provided with labelling for identification.
KENCANA SQUARE
BUILDING CONTROL SYSTEM (BCS) INTERFACE
SECTION BCS-078
Page 2
2.2
General
The MVAC Services covers the Air Conditioning System and Ventilation
System. The requirements for these systems and plant are as specified
herein.
.2
General
Each AHU shall be provided with a DDC for the control and
monitoring of the AHU input/output points and operational
requirements as specified hereunder.
All the necessary field sensors devices and instrumentation such
as temperature sensors, humidity sensors, pressure sensors, flow
rate sensors, etc as required for the proper operation and controls
of the AHU shall be supplied and installed by the BCS Contractor
except for the following items which are to be supplied and
installed by the Air Conditioning Services Contractor:-
.2
.1
.2
.3
Flow meter
Type of AHU
The type of AHUs required are as indicated in the schedule of I/O
points. Type 1 AHU is for constant volume application whereas
Type 2 AHU is for variable volume application.
.3
.2
.3
.4
.5
KENCANA SQUARE
BUILDING CONTROL SYSTEM (BCS) INTERFACE
SECTION BCS-078
Page 3
.4
.6
.6
BCS/Manual/Off Mode.
.7
.7
Airflow switch.
.8
.9
.10
.11
BTU Monitoring
.2
.3
.4
.5
.6
.7
Fresh Air VAV boxes - Varying fresh air supply flow rate.
.8
.9
BCS/Manual/Off mode.
.10
.11
.12
.13
.14
KENCANA SQUARE
BUILDING CONTROL SYSTEM (BCS) INTERFACE
SECTION BCS-078
Page 4
.5
.16
.17
.18
.19
BTU Monitoring
.20
.6
.1
.2
.3
.4
General
Each FCU shall be provided with a DDC for the control and
monitoring of the FCU input/output points and operational
requirements as specified hereunder.
All the necessary field sensors devices and instrumentation
such as temperature sensors, humidity sensors, pressure
sensors, flow rate sensors, etc as required for the proper
operation and controls of the FCU shall be supplied and
installed by the BCS Contractor except for the following
items which are to be supplied and installed by the Air
Conditioning Services Contractor:.1
.2
.3
KENCANA SQUARE
BUILDING CONTROL SYSTEM (BCS) INTERFACE
SECTION BCS-078
Page 5
.2
.2
.3
.4
.5
BCS/Manual/Off mode.
.6
.7
.8
.9
.10
BTU monitoring
Ventilation System
.1
General
The BCS Contractor shall be responsible for all other
necessary arrangement for the remote start/stop, alarm
processing and status indication of all ventilation fans.
.2
KENCANA SQUARE
BUILDING CONTROL SYSTEM (BCS) INTERFACE
SECTION BCS-078
Page 6
.8
.1
.2
.3
.4
.9
2.3
ELECTRICAL SERVICES
.1
General
The electrical services covers the high voltage and low voltage
distribution systems and essential power supply system.
The Electrical Contractor shall supply and install the required transducers,
relays, volt-free contacts, kWh pulse meter, kVarh pulse meter and
current transformers for monitoring of the I/O points.
All digital and analogue signals for BCS interface shall be terminated in
the marshalling kiosk provided by the Electrical Contractor.
.2
KENCANA SQUARE
BUILDING CONTROL SYSTEM (BCS) INTERFACE
SECTION BCS-078
Page 7
.3
.1
On, Off and Trip status indication for all incoming and outgoing
feeder circuit breakers.
.2
.3
.4
.5
Energy consumption via kWh and kVarh meter pulse outputs for
recording and totalisation of designated feeders
Transformers
The BCS shall provide the DDCs to the transformers that monitor the
following :
.1
.2
.3
.4
.4
.5
.1
On, Off and Trip status of all incoming and outgoing feeder circuit
breakers.
.2
.3
.4
Energy consumption via kWh and kVarh meter pulse outputs for
recording and totalisation of incoming feeders.
Distribution Boards
The BCS shall provide control of the designated lighting points in the
distribution boards by providing preset time switching.
The BCS shall provide the DDCs to control and monitor the following:
.1
.2
.3
KENCANA SQUARE
BUILDING CONTROL SYSTEM (BCS) INTERFACE
SECTION BCS-078
Page 8
.6
.7
2.4
PLUMBING SYSTEM
.1
General
The BCS Contractor shall provide the DDC Controller to monitor the Cold
Water Plumbing System and the Sump Pump System. The Plumbing
Contractor shall provide shall provide volt-free dry contacts with labelled
terminal strips, in the interface panel for BCS to interface.
.2
.3
KENCANA SQUARE
BUILDING CONTROL SYSTEM (BCS) INTERFACE
SECTION BCS-078
Page 9
.2
.3
.4
2.5
LPG System
.1
2.6
The BCS Contractor shall provide the DDC controllers that monitor the
following :
.1
.2
.2
The BCS Contractor shall provide high level interfacing to the following
other computer-based building systems and microprocessor-based
systems:.1
.2
.3
.4
.5
.6
BTU Monitoring