connect the sources to the main bus bar according the priority.
Almost all the off grid BTS are driving by using diesel
source.
generator which has cost of 22 taka per unit while grid power
cost is only 8 taka per unit [5]. The government has already
grid power for any new BTS. In this situation these companies
from grid.
INTRODUCTION
TN
BANGLADESH
Fig.1
which are connected to the main bus [3]. Grid power can
shows
the
implementation
cost
of
the
renewable
long run it is very much cost effective [6]. For the diesel
Normally the voltage level does not vary so much. But for the
generator the initial cost is low but cost goes higher with the
time.
manually.
So,
microcontroller
based
power
1,200,000
/
/
/
1,000,000
'"
VI
:::J
800,000
600,000
-Renewable
Solution Net
Cashflow
400,000
200,000
- Diesel Solution
Net Cashflow
'"
0
1
Fig. I.
10
Fig. 2.
Circuit Diagram of Microcontroller Based Hybrid
Management For Off Grid Base Transceiver Station (BTS)
Power
sample
is
send
to
microcontroller
because
based power
management
is capable
of
selecting the particular source among all the sources which has
required power to drive the system. Microcontroller will select
the sources according to the priority that has been provided to
it. If any of these sources does not contain enough power then
connect. The main bus bar is also connected with the voltage
output whatever its input is. All the equipment in the BTS are
and resistances are used for the safety purposes so that huge
the output.
5V
source
has
been
used
to
run
the
Fig. 4.
Fig. 3.
Microcontroller Code
Fig. 5.
c) When both the solar and biogas generator fail to supply the
required voltage then a combination of these two sources will
software pickit2. Then the chip is ready to use for the desired
operation and it is possible to change the instruction through
code again and again.
Fig. 6.
voltage only then the diesel generator will provide the required
power as a backup source.
the chip.
Fig. 7.
VI. CONCLUSION
The number of Base Transceiver Station is increasing very
rapidly and there is no possibility to decrease the number of
cell phone user. As the present power generation condition of
V. RESULTS
LCD display is used to observe the result of this entire project.
[t has two column and sixteen rows. [n the first row it shows
the name of the operating sources and in the second row it
shows the voltage rating of these sources.
a) When the solar panel has enough power to drive the system.
much cost effective in the long run although the initial cost is
quite high.
ACKNOWLEDGMENT
The authors would like to express sincere gratitude to Dr.
Abdur Rahman, Department of EEE, American International
University- Bangladesh for his valuable suggestions during the
preparation of this paper.
the run time of diesel generator has been reduced a lot. Few
REFERENCES
[1]
[2]
[3]
Hybrid
Power
Systems.
PowerOasis,
Available
at-
http://www.poweroasis.com
[4]
[5]
GSMA
Website.
Available
at
http://www. gsma.comlmobilefordevelopment/wp
content/uploads/2013/03/GPM-Market-Analysis-Bangladesh. pdf
[6]
Delivering cost savings for off grid hybrid telecom power system,
pez,Jose
1126,2007
Rodolfo Dufo-Lo
used to sense the grid power and these sources will come into
rating and the name of the operating sources. Few works can
Caisheng Wang, M Hashem Nehrir, "Power Management of a StandAlone Wind/Photovoltaic/Fuel Cell Energy System", IEEE Trans.
Energy Conversion,vol. 23, no.3, September 2008
batteries,
Available
Evolion
at
http://www.saftbatteries.comlforce_download/EvolionHybrid_Applicati
onBrochure_ EN_0713_Protected. pdf