INFORME FINAL
FEBRERO DE 2005
TABLA DE CONTENIDO
Pgina
1.
2.
3.
4.
5.
6.
INTRODUCCIN
1.1
1.2
1.3
Generalidades
Objetivos y Alcance
Consideraciones de diseo
1
2
2
LOCALIZACIN Y ANTECEDENTES
11
2.1
2.2
2.3
11
11
14
Localizacin
Antecedentes
Descripcin fsica de la cuenca del ro Guadalajara
INFORMACIN BASICA
17
3.1
3.2
3.3
3.4
17
17
20
20
Cartografa
Hidrometeorologa
Topografa
Estudios anteriores
HIDROLOGIA
21
4.1
4.2
4.3
21
21
22
Clima
Precipitacin
Hidrologa
GEOMORFOLOGIA
27
5.1
5.2
5.3
5.4
5.5
27
27
30
31
32
Objetivo
Geologa
Geologa superficial
Morfologa histrica del ro Guadalajara
Suelos
ANLISIS HIDRULICO
34
6.1
6.2
6.3
34
34
35
6.4
7.
8.
Resultados
36
ANLISIS DE LA SOCAVACION
39
7.1
7.2
7.3
39
41
35
Anlisis de inundabilidad
Alternativas de control de erosiones y fijacin de orillas
Alternativas de control de erosin y fijacin de fondos
44
50
53
9.
OBRAS PROPUESTAS
55
10.
CONCLUSIONES Y RECOMENDACIONES
58
11.
61
1.
INTRODUCCION
1.1
Generalidades
HIDROINGENIERIA LTDA
Objetivos y Alcance
1.3
Consideraciones de diseo
HIDROINGENIERIA LTDA
2. Construccin
de
obras
de
control
de
inundaciones
con
bajas
HIDROINGENIERIA LTDA
HIDROINGENIERIA LTDA
HIDROINGENIERIA LTDA
HIDROINGENIERIA LTDA
HIDROINGENIERIA LTDA
Fotografa 1-11 Profundizacin del cauce del ro en el tramo aguas abajo del
puente de la carrera 12 sobre la margen izquierda
HIDROINGENIERIA LTDA
HIDROINGENIERIA LTDA
10
Fotografas 1-14 y 1-15 Profundizacin del cauce del ro, debido a la destruccin de la bocatoma de El Albergue. Esta profundizacin
amenaza en el corto plazo la estabilidad del puente de El Derrumbado.
HIDROINGENIERIA LTDA
11
2.
LOCALIZACION Y ANTECEDENTES
2.1 Localizacin
El tramo a estudiar est ubicado en el rea urbana del Municipio de Buga, y
comprende una longitud aproximada de 2.6 Km medidos hacia aguas arriba desde
el puente de la carrera 16.
El rea de influencia del problema que se plantea en este proyecto, se limita
bsicamente a la cuenca hidrogrfica del ro Guadalajara. Localizada en la
jurisdiccin del municipio de Buga, Departamento del Valle; la cuenca est
compuesta por la extensin territorial de los corregimientos de La Habana,
Monterrey, Miraflores y La Mara.
Las coordenadas geogrficas aproximadas que enmarcan esta rea son las
siguientes:
(1'080.000E, 930.000N), (1'106.000E, 930.000N),
(1'106.000E, 912.000N), (1'080.000E, 912.000N)
La cuenca hidrogrfica del ro Guadalajara tiene un rea aproximada de 13000
hectreas. El rea de influencia tiene alturas desde los 1100 msnm hasta los 3000
msnm.
2.2 Antecedentes
El ro Guadalajara ha tenido histricamente una gran dinmica, producto de su
pendiente y de la gran cantidad de agua y slidos que transporta.
A principios de la dcada de los 60 se construy el puente denominado antiguo de
la va Cali- Tulu, que es parte de la va Panamericana, y desde antes se tiene
noticia de eventos recurrentes del movimiento del ro y de los altos niveles de agua
HIDROINGENIERIA LTDA
12
HIDROINGENIERIA LTDA
13
viviendas
en
cercanas
del
puente
Abada
presentando
leves
HIDROINGENIERIA LTDA
14
2.3
HIDROINGENIERIA LTDA
15
HIDROINGENIERIA LTDA
16
HIDROINGENIERIA LTDA
17
3.
INFORMACIN BSICA
3.1
Cartografa
Plano con cartografa bsica del rea rural del municipio de Buga, en escala
1:50000, POT de Guadalajara de Buga 2004-2012.
3.2
Hidrometeorologa
HIDROINGENIERIA LTDA
18
Cuadro 3-1
CARACTERISTICAS Y LOCALIZACION DE LAS ESTACIONES HIDROMETEREOLOGICAS UTILIZADAS
ESTACION
EL VERGEL
CLASE
SUBCUENCA
LG
GUADALAJARA
MUNICIPIO LATITUD
BUGA
3.53
LONGITU
D
NORTE
ESTE
ALTITUD
FEI
73.16
921812.013
1423961.165
1090
7201
FEI=FECHA INSTALACION
HIDROINGENIERIA LTDA
19
Cuadro 3-2
Estacin El Vergel
Registros Histricos de Caudales Mximos
AO
CAUDAL (m3/s)
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1997
1998
1999
2000
2001
2002
2003
155.00
46.00
122.10
79.90
45.20
27.20
57.70
49.30
57.40
230.70
52.40
36.90
65.50
78.00
108.40
89.85
129.00
79.56
85.00
53.73
40.33
44.20
61.60
38.35
116.60
17.85
78.62
57.85
43.29
54.77
56.32
80.16
2004
HIDROINGENIERIA LTDA
20
3.3
Topografa
3.4
Estudios Anteriores
HIDROINGENIERIA LTDA
21
HIDROLOGIA
4.1
Clima
Por su ubicacin latitudinal, entre 3 y 4 grados de Latitud Norte, los valores medios
de algunas variables meteorolgicas como la temperatura, la presin atmosfrica y
la humedad relativa, son muy estables a lo largo del ao; siendo en cambio
importantes sus oscilaciones diarias as como la funcin de la altura sobre el nivel
del mar.
Las estaciones de verano e invierno estn definidas por la magnitud de las lluvias,
por lo tanto, no existen aqu estaciones de origen trmico como en las latitudes
media y alta, sino que la regin disfruta de un clima tropical hmedo influenciado en
forma local por la Cordillera de los Andes y el Ocano Pacfico.
Tambin debido a su localizacin ecuatorial, los vientos son en general muy dbiles,
determinados por las circulaciones del valle- montaa. El parmetro climtico ms
variable y por lo tanto de mayor importancia en el rea es la precipitacin y despus
la temperatura por su variacin a lo largo del da
Los pisos trmicos que se encuentran en la cuenca son:
Piso trmico Clido, que comprende reas entre los 600 y 1200 msnm, con
temperaturas promedio de 24 oC.
Piso trmico Medio, que comprende reas entre los 1200 y 2000 msnm y cuya
temperatura promedio es de 17 oC.
Piso trmico Fro, incluye rea que se encuentran entre 2000 y 3200 msnm y la
temperatura promedio es de 12 oC
4.2
Precipitacin
HIDROINGENIERIA LTDA
22
mnima precipitacin. Los meses mas lluviosos son marzo, abril, mayo, septiembre,
octubre y noviembre, con un promedio mensual de 89 mm. Las mayores
intensidades de lluvia se presentan en el mes de octubre.
La precipitacin se incrementa en forma gradual, conforme se asciende hacia la
cordillera hasta los 2000 msnm; luego, desciende la precipitacin hasta los 3000
msnm con magnitudes similares a la de las zonas ms bajas. Las partes altas de la
cordillera central se caracterizan por tener precipitaciones casi continuas en forma
de llovizna, la nubosidad es permanente.
4.3
Hidrologa
HIDROINGENIERIA LTDA
23
X = X + X
Es decir que el evento X, correspondiente a una determinada frecuencia dentro de
una serie de datos histricos, va a estar representado por el valor medio aritmtico
(X)
de los datos de la muestra y por una desviacin respecto a ste valor medio
X = X + KSx
Donde K es el factor de frecuencia que depende de la frecuencia de recurrencia o
perodo de retorno del evento x y del tipo de distribucin de probabilidades que el
mtodo adopte, y Sx es la desviacin tpica de la muestra que se puede expresar en
la siguiente forma:
( x x)
n
Sx =
n 1
HIDROINGENIERIA LTDA
24
X =
x
1
HIDROINGENIERIA LTDA
25
ao. As los mximos flujos anuales constituyen una serie que puede ajustarse con
base en la distribucin extrema.
El factor de frecuencia K calculado por Gumbel se define como:
K=
Y Yn
Sn
El Vergel
Gumbel (El Vergel)
220
Normal 2 parmetros
CAUDAL (m3/s)
200
180
160
140
120
100
80
60
40
20
0
1.01
1.1
1.25
1.5
2.33
10
25
50
100
200
500
Cuadro 4-1
Caudales Mximos
HIDROINGENIERIA LTDA
26
PERIODO
DE
RETORNO
(aos)
GUMBEL TIPO I
Log Gumbel
Normal 2 param
Log Normal 2
Log Pearson
1.01
2.00
5.00
10.00
20.00
25.00
30.00
-5.21
66.59
109.52
137.94
165.20
173.85
180.88
24.64
59.11
99.73
141.00
196.57
218.41
237.96
-25.69
73.09
108.76
127.41
142.81
147.30
150.83
19.20
63.97
98.82
124.03
149.63
158.04
164.98
32.02
55.51
92.01
129.27
176.79
194.54
210.00
38.78
51.64
80.57
126.86
226.39
281.06
339.30
50.00
100.00
500.00
200.49
226.93
288.04
302.18
417.07
878.23
160.15
171.70
195.09
184.82
212.77
282.95
258.11
335.61
577.74
609.82
1568.17
29979.14
1000.00
314.31
1209.59
204.08
315.71
712.34
154586.65
ESTACIN EL VERGEL
Cuadro 4-2
Ro Guadalajara - El Vergel
Caudales mximos (m3/s)
Perodo de retorno (aos)
Cauce
Ro
Guadalajara
10
20
66.59
109.5
2
137.9
4
165.2
0
25
30
50
100
500
173.8
288.0
180.88 200.49 226.93
5
4
HIDROINGENIERIA LTDA
27
5.
GEOMORFOLOGA
5.1
Objetivo
5.2
Geologa
HIDROINGENIERIA LTDA
28
Unidad A
La unidad A, la cual nos compete en el presente estudio, es la ms superior,
tiene un gran predominio de sedimentos permeables y est conformada de la
siguiente forma: en los primeros 70 m de espesor se encuentran sedimentos
arcillosos y limosos muy variados, estos estn en mayor proporcin que los
sedimentos arenosos, adems lentes de arenas y gravas con arcillas; el
porcentaje, tamao, forma, redondez y composicin es muy variable. Niveles de
suelos fsiles, turba y materia orgnica se encuentran tambin a diferentes
profundidades.
En los siguientes 40 m dentro de la misma unidad A, se encuentran capas de
arena y gravas combinadas en diferentes proporciones. Poseen un tamao,
forma y redondez, muy variado, su composicin deriva principalmente de rocas
verdes y cuarzo lechoso. Existen lentes de arcilla, as como suelos fsiles y
materia orgnica.
Unidad B
Esta es una capa relativamente impermeable de unos 80 m de espesor,
formada por sedimentos arcillosos lenticulares, con algunas arenas y gravas
variadas y en diferentes proporciones. En general los sedimentos arcillosos
constituyen entre el 60 y 100% de la unidad.
Unidad C
Esta unidad ha sido estudiada parcialmente y se caracteriza por tener
intercalaciones de sedimentos permeables e impermeables, los permeables
frecuentemente tienen espesores considerables y en ellos se originan pozos
saltantes. Las gravas y arenas componen ms del 50% del espesor estudiado.
Se distinguen tres unidades fisiogrficas bien definidas, la primera es el rea de
vertientes, la segunda el rea de colinas y las tercera es el rea de origen aluvial.
HIDROINGENIERIA LTDA
29
HIDROINGENIERIA LTDA
30
5.3
Geologa superficial
Q1:
del
cuaternario.
Ocupan
el
sector
de
aguas
arriba,
Q4:
HIDROINGENIERIA LTDA
31
5.4
HIDROINGENIERIA LTDA
32
5.5
Suelos
HIDROINGENIERIA LTDA
33
HIDROINGENIERIA LTDA
34
6. ANLISIS HIDRAULICO
6.1
confluencias
HIDROINGENIERIA LTDA
35
6.2
Aplicacin
Condiciones de borde:
6.3
Coeficiente de rugosidad
HIDROINGENIERIA LTDA
36
nc = Rugosidad equivalente
ni = Rugosidad de la sub-rea
P,Pi= Permetros mojados del rea total y sub-reas
6.4
n= 0.070
n= 0.070
Resultados
HIDROINGENIERIA LTDA
37
Los resultados que arroja el programa pueden ser grficos (parciales, totales, etc.) y
tablas. Ambos pueden ser editados por el usuario en la medida que requiera mayor
o menor informacin.
Los resultados presentados en este estudio son una porcin, la ms representativa,
de todo el cmulo de informacin obtenida. El detalle se muestra en los anexos y en
las Figuras 6-1 y 6-2 el perfil obtenido para el tramo en estudio y el detalle para el
tramo comprendido entre los puentes La Libertad y la carrera 16.
En los cuadros del anexo hidrulico se presenta en cada uno de ellos los resultados
del trnsito hidrulico, la informacin que all aparece corresponde a:
Qtotal= caudal (m/s), Min.Ch.El= elevacin fondo, Crit.W.S= elevacin altura crtica,
E.G.Elev= elevacin de la lnea de energa, E.G.Slope= pendiente de la lnea de
energa, Vel Chnl= velocidad media del canal, Flow Area= Area mojada, Top Width=
Ancho superior del espejo de agua, Froude # Chl= Nmero de Froude, Length ChnlLeft-Rght= Longitud del canal por el eje - banca izquierda - banca derecha, Mann.
Comp= rugosidad equivalente de la seccin.
Valores de Froude < 1.0 corresponden a rgimen de flujo subcrtico. Se usa 0.1 como
coeficiente de contraccin y 0.3 de expansin en las secciones uniformes. En los
puentes estos valores cambian 0.3 y 0.5 respectivamente.
Los resultados del modelo muestran que para un perodo de retorno de 1 vez en 100
aos se produce desbordamiento de agua en el tramo comprendido entre las calles 9 y
16, requirindose las construccin de obras de control de inundaciones sobre la
margen derecha en prcticamente todo este tramo y sobre la margen izquierda frente a
las instalaciones de bomberos y en el parque de El Albergue. Para los caudales
estudiados que corresponden a un rango comprendido entre 109.2 m3/s y 226.93 m3/s
para perodos de retorno entre 5 y 100 aos respectivamente, el nmero de Froude
vara entre 0.35 y 0.80, es decir, se trata prcticamente de flujo subcrtico, con algunas
excepciones a las salidas de los puentes y en la estructura de control de fondo
localizada inmediatamente aguas abajo del puente de La Libertad donde se presentan
HIDROINGENIERIA LTDA
38
1040
Legend
WS 100
WS 50
WS 25
WS 10
1020
WS 5
Ground
LOB
ROB
Elevation (m)
1000
980
940
1000
2000
3000
82
81
80
79
78
77
76
75
74
73
43
44
45
46
47
48
49
50
53
56
58
60
62
64
66
67.5
70
41
40
39
36
33
32
31
30
27
6
8
11
16
22
960
4000
Legend
WS 100
WS 50
WS 25
WS 10
975
WS 5
Ground
LOB
ROB
Elevation (m)
970
1400
1600
1800
2000
2200
72 Seccin 31 Folmes
71 Seccion 30 Folmes
70 Seccion 29 folmes
69 Seccion 28 Folmes
67 Seccin 26 Folmes
67.5 Puente carrera 9
66 Seccin 25 Folmes
65 Seccion 24 Folmes
64 Secin 23 folmes
63 Seccion 22 Folmes
62 Seccion 21 Folmes
61 Seccion 20 folmes
60 Seccion 19 Folmes
59 Seccion 18 Folmes
58 Seccion 17 Folmes
57 Seccin 16 Folmes
56 Seccion 15 Folmes
55 Seccion 14 Folmes
52 Seccion 11 Folmes
51 Seccion 10 folmes
50 Seccion 9 Folmes
49 Seccion 8 Folmes
48 Seccion 7 Folmes
47 Seccion 6 Folmes
46 Seccin 5 Folmes
45 Seccin 4 Folmes
44 Seccin 3 Folmes
43 Seccin 2 Folm...
955
41 Seccin 41 T...
40 Seccin ...
960
53 Seccion 12 Folmes
53.5 Puente carrera 12 La Libertad
965
2400
HIDROINGENIERIA LTDA
39
7. ANLISIS DE LA SOCAVACION
Con base en las dos actividades anteriores y a la informacin de sedimentos, se
determina la socavacin tanto general como local para cada el sitio indicado
anteriormente. Esta informacin es necesaria para determinar la profundidad de la
cimentacin de los puentes a construir y revisar la de los existentes.
7.1
Be
Ho
HS
Sr
HS = (Ho5/3/0.68*dm0.28*)1/(1+z)
= Qd / (Hm)5/3*Be*u
donde:
HIDROINGENIERIA LTDA
40
= Coeficiente
Hs = Profundidad del cauce alcanzado por la erosin (m)
Ho = Profundidad del agua antes de socavacin
Sr = Socavacin general en un punto (m)
= Coeficiente de paso, funcin de la frecuencia de la creciente
dm = Dimetro medio del material granular de fondo (mm)
dm = di/pi/100.
di = Dimetro medio en mm de una fraccin de la curva granulomtrica
pi = Peso de dicha fraccin en % del peso total de la muestra.
z = Exponente para suelos granulares. Depende de dm
= Coeficiente de arrastre de material en suspensin.
Qd (m3/s)
A (m2)
Vm (m/s)
Be (m)
Hm (m)
226.93
59.29
3.83
39.18
0.97
1.51
2.99
(aos)
100
2.61
4.14
1.53
HIDROINGENIERIA LTDA
41
7.2
z 3 f b = 4.75
(z 0 z 3 )0.2 q 0.57
dt
0.32
Figura 7-2
Clculo de la socavacin aguas abajo de una presa
Tomado del libro Estruturas flexiveis para obras fluviais (Maccaferri gabios do Brasil
Ltda. 1981, pag 32).
Donde:
q=Caudal por unidad de ancho (m3/s/m)
dt=Dimetro del tamiz que permite el paso del 90% del material del lecho (mm)
zi=Nivel del agua en el punto i (m)
fi=Nivel del fondo en el punto i (m)
HIDROINGENIERIA LTDA
42
q=
226.93
39.18
q=5.79m3/s/m
Teniendo en cuenta que el nivel del fondo actual del ro est por debajo del nivel
propuesto para la corona de la contrapresa, se tiene que esta rea del ro se debe
rellenar con material aluvial importado y que se puede proponer el dimetro de este
material, se propone que el dt sea igual a 100.00mm, sin embargo para efectos de
un factor de seguridad se utilizar el d90 calculado a partir de la granulometra del
material obtenido de los apiques y que corresponde a 1-1/2, es decir 38.1mm. Con
este valor y los valores conocidos de zi (obtenidos del trnsito hidrulico), fi, q se
calcula la profundidad de socavacin esperada para estas condiciones.
Reemplazando estos valores en la ecuacin propuesta por Schoklitsch se tiene:
z 3 f b = 4.75
z3 f b = 0.98
f b = 967.71 0.98
f b = 966.73m
Sin embargo al analizar este nivel con las cotas actuales del fondo del ro y los
resultados obtenidos para la socavacin general, se recomienda utilizar los
HIDROINGENIERIA LTDA
43
HIDROINGENIERIA LTDA
44
8.1
Anlisis de inundabilidad
Para el tramo comprendido entre los puentes de las carreras 9 y 16, se analizaron
varios perodos de retorno para sus crecientes. Los niveles de agua para crecientes
con un perodo de retorno de 1 vez en 100 aos, generan desbordamientos en el
trayecto analizado, tal como puede verse en el anexo de resultados hidrulicos.
De acuerdo con los resultados obtenidos, se propone la proteccin para un perodo
de retorno de 1 vez en 100 aos, mas un borde libre de 1.0m. Debido a la
irregularidad del fondo del ro, se propone que la corona de las obras proyectadas
sea la envolvente que une los niveles obtenidos en dos o mas secciones contiguas
del sector, ms el borde libre de 1.0 m.
Para facilitar el diseo de las obras, el tramo en estudio se dividi en los siguientes
sectores, en los cuales se detect de acuerdo a los resultados del trnsito hidrulico
y a los registros de los desbordamientos anteriores, que se presentan
desbordamientos:
Margen izquierda
Sector parque El Albergue y sede de bomberos, con una longitud
aproximada de 239m.
Margen derecha
Sector puente carrera 9-restaurante Don Carlos, con una longitud de
aproximada de 50m.
Sector restaurante Don Carlos-puente La Libertad, con una longitud
aproximada de 249m.
HIDROINGENIERIA LTDA
45
Por lo general las obras de este tipo construidas en zonas urbanas deben ser
realizadas con material importado y por lo tanto tienen el sobrecosto del cargue y
acarreo del material.
HIDROINGENIERIA LTDA
46
Fotografa 8-1 Descapote del rea del dique El Ingenio en la margen derecha del
ro Melndez
HIDROINGENIERIA LTDA
47
Fotografa 8-3 Dique El Ingenio en la margen derecha del ro Melndez una vez
terminado
HIDROINGENIERIA LTDA
48
Fotografa 8-5 Dique de control de inundaciones en la margen izquierda del ro Llipredios de constructora Melndez-Cali
Fotografa 8-6 Dique de control de inundaciones en la margen izquierda del ro Llipredios de constructora Melndez-Cali
HIDROINGENIERIA LTDA
49
HIDROINGENIERIA LTDA
50
8.2
a.
Proteccin longitudinal
A partir de una visin macroscpica del comportamiento del ro y de su
geometra, en el tramo en estudio no se visualizan curvas de grandes radios
que describan de forma consistente el recorrido del ro, y su coherencia con
cada tramo recto, con cada curva precedente, y con las obras y estructuras
HIDROINGENIERIA LTDA
51
HIDROINGENIERIA LTDA
52
HIDROINGENIERIA LTDA
53
8.3
HIDROINGENIERIA LTDA
54
Fotografa 8-12 Obra de fijacin de fondo, que permite toma de agua hacia la
margen izquierda y protege contra socavacin los estribos y pila central del puente
de la carrera 12
HIDROINGENIERIA LTDA
55
9. OBRAS PROPUESTAS
A continuacin se presenta una descripcin de las obras propuestas para cada uno de
los cauces en estudio.
Obras de control de inundaciones
Como obras de control de inundaciones se propone la construccin de diques en tierra,
que se diferencian entre si por el ancho de la corona, el cual es de 2.0 m para todos los
diques proyectados con excepcin del localizado entre el restaurante Don Carlos y la
carrera 11 el cual debido al poco espacio disponible requiere de un ancho de corona de
1.0 m. En la Figura 9-1 se muestra la seccin tpica de los diques a construir, en los
cuales el cajeo indicado es variable entre 0.6 y 1.0m y depende del material encontrado
en los apiques realizados. En los Planos 254-02 y 254-03 se indica la localizacin en
planta de los diques propuestos y en el Plano 254-04 secciones transversales con su
localizacin y en el Plano 254-05 las caractersticas fsicas de los diques y el detalle de
sus empalmes con las estructuras existentes.
HIDROINGENIERIA LTDA
56
HIDROINGENIERIA LTDA
57
HIDROINGENIERIA LTDA
58
10.2
10.3
Las obras propuestas son aquellas que se consideran vitales para el control
de inundaciones y la estabilizacin de los muros del sector y para preservar
los puentes de las carreras 9, 12 y 16.
10.4
10.5
Hay estudios realizados por la CVC y Minercol que han dado pautas para el
manejo de la minera en la cuenca y en el cauce del ro, las cuales deben ser
HIDROINGENIERIA LTDA
59
10.7
10.8
10.9
HIDROINGENIERIA LTDA
60
10.11 Con el propsito de evitar que durante las crecientes del ro Guadalajara, el
agua se presenten inundaciones del rea urbana por reflujo del sistema de
alcantarillado, se recomienda que la empresa encargada de este sistema en
el municipio, instale compuertas de chapaleta en todas las entregas del
alcantarillado al ro Guadalajara y a su vez construya estructuras de
disipacin de energa en estas entregas para evitar la erosin del lecho.
HIDROINGENIERIA LTDA
Cuadro 11-1
MUNICIPIO DE BUGA
PRESUPUESTO DE OBRA
OBRAS DE CONTROL DE INUNDACIONES Y ESTABILIZACION DE CAUCE RIO GUADALAJARA
ITEM
ACTIVIDAD
UNID.
CANT.
Vr.UNITARIO
Vr.TOTAL
Gl
1.2
Localizacin y replanteo
Desmonte y limpieza con reposicin
y plante de arbustos, rboles y
empradizacin
2.1
2.2
$ 1,554,245
$ 1,554,245
123.00
$ 1,306
$ 160,683
Un
5.00
$ 8,446
$ 42,228
Un
0.00
$ 68,694
$0
611.31
$ 4,033
$ 2,465,449
Descapote (e=0.20m)
100.86
$ 2,216
$ 223,506
m3
211.81
$ 6,119
$ 1,295,999
$ 8,355
$ 84,272
$ 1,603
$ 1,704
$ 21,273
$ 12,664,080
$ 18,492,166
$ 1,306
$ 184,198
$ 501,736
$ 4,660,873
$ 4,845,071
$ 1,554,245
$ 1,554,245
2.3
1.2
8
Localizacin y replanteo
141.00
Estructuras en concreto
Concreto en muros
Concreto en pantallas, incluye
8.1.3
m3
formaleta 3500 psi
SUBTOTAL A-2
8.1
9.29
Campamento
Gl
1.2
Localizacin y replanteo
Desmonte y limpieza con reposicin
y plante de arbustos, rboles y
empradizacin
85.00
$ 1,306
$ 111,041
Un
5.00
$ 8,446
$ 42,228
Un
2.00
$ 68,694
$ 137,388
m2
458.15
$ 4,033
$ 1,847,745
Descapote (e=0.20m)
m3
74.80
$ 2,216
$ 165,757
2
2.1
2.2
2.3
3
1 de 8
Cuadro 11-1
MUNICIPIO DE BUGA
PRESUPUESTO DE OBRA
OBRAS DE CONTROL DE INUNDACIONES Y ESTABILIZACION DE CAUCE RIO GUADALAJARA
ITEM
ACTIVIDAD
UNID.
CANT.
Vr.UNITARIO
m3
403.92
$ 6,119
$ 2,471,507
29.92
$ 8,355
$ 249,993
299.20
$ 1,603
$ 479,709
700.40
$ 21,273
$ 14,899,418
$ 21,959,032
5
5.1
5.2
6
Vr.TOTAL
Campamento
Gl
1.2
Localizacin y replanteo
Desmonte y limpieza con reposicin
y plante de arbustos, rboles y
empradizacin
2
2.1
2.2
$ 1,554,245
$ 1,554,245
140.00
$ 1,306
$ 182,892
Un
5.00
$ 8,446
$ 42,228
Un
2.00
$ 68,694
$ 137,388
786.80
$ 4,033
$ 3,173,210
Descapote (e=0.20m)
127.40
$ 2,216
$ 282,318
m3
689.19
$ 6,119
$ 4,217,030
51.07
$ 8,355
$ 426,726
510.72
$ 1,603
$ 818,840
1,226.12
$ 21,273
$ 26,082,916
$ 36,917,793
2.3
5
5.1
5.2
6
Campamento
Gl
1.2
Localizacin y replanteo
Desmonte y limpieza con reposicin
y plante de arbustos, rboles y
empradizacin
97.00
$ 1,306
$ 126,718
Un
5.00
$ 8,446
$ 42,228
Un
2
2.1
2.2
2.3
3
2.00
$ 68,694
$ 137,388
398.67
$ 4,033
$ 1,607,859
62.08
$ 2,216
$ 137,569
m
m
2 de 8
Cuadro 11-1
MUNICIPIO DE BUGA
PRESUPUESTO DE OBRA
OBRAS DE CONTROL DE INUNDACIONES Y ESTABILIZACION DE CAUCE RIO GUADALAJARA
ITEM
ACTIVIDAD
UNID.
CANT.
Vr.UNITARIO
m3
335.23
$ 6,119
$ 2,051,218
24.83
$ 8,355
$ 207,481
248.32
$ 1,603
$ 398,133
534.47
$ 21,273
$ 11,369,635
$ 16,078,229
5
5.1
5.2
6
Vr.TOTAL
Campamento
Gl
1.2
Localizacin y replanteo
Desmonte y limpieza con reposicin
y plante de arbustos, rboles y
empradizacin
50.00
$ 1,306
$ 65,318
2.1
Un
0.00
$ 8,446
$0
2.2
Un
0.00
$ 68,694
$0
2.3
m2
241.50
$ 4,033
$ 973,983
Descapote (e=0.20m)
m3
40.00
$ 2,216
$ 88,640
m3
216.00
$ 6,119
$ 1,321,661
16.00
$ 8,355
$ 133,686
160.00
$ 1,603
$ 256,529
350.00
$ 21,273
$ 7,445,455
$ 10,285,273
5
5.1
5.2
6
$0
3 de 8
Cuadro 11-1
MUNICIPIO DE BUGA
PRESUPUESTO DE OBRA
OBRAS DE CONTROL DE INUNDACIONES Y ESTABILIZACION DE CAUCE RIO GUADALAJARA
ITEM
ACTIVIDAD
UNID.
CANT.
Vr.UNITARIO
Vr.TOTAL
Localizacin y replanteo
240.00
$ 1,306
$ 313,528
Un
5.00
$ 8,446
$ 42,228
Un
2.00
$ 68,694
1,159.20
$ 1,866
$ 2,163,067
Descapote
192.00
$ 2,216
$ 425,472
m3
1,036.80
$ 6,119
$ 6,343,974
76.80
$ 8,355
$ 641,693
768.00
$ 1,603
$ 1,231,339
1,680.00
$ 21,273
$ 35,738,182
$ 46,899,483
5
5.1
5.2
6
4 de 8
Cuadro 11-1
MUNICIPIO DE BUGA
PRESUPUESTO DE OBRA
OBRAS DE CONTROL DE INUNDACIONES Y ESTABILIZACION DE CAUCE RIO GUADALAJARA
ITEM
ACTIVIDAD
UNID.
CANT.
Vr.UNITARIO
Vr.TOTAL
m3
15.00
$ 147,380
$ 2,210,702
m3
15.00
$ 6,119
$ 91,782
m3
0.00
$ 8,355
$0
m3
0.00
$ 1,603
$0
m3
79.40
$ 11,083
$ 879,962
m3
377.72
$ 3,236
$ 1,222,118
m3
0.00
$ 14,580
$0
m3
0.00
$ 6,858
$0
m3
457.12
$ 2,008
$ 918,012
m2
19.85
$ 25,206
$ 500,337
167.53
$ 451,562
$ 75,651,995
251.30
$ 501,736
$ 126,086,658
$ 2,757
$ 100,011,000
36,275.30
$ 314,645,440
5 de 8
Cuadro 11-1
MUNICIPIO DE BUGA
PRESUPUESTO DE OBRA
OBRAS DE CONTROL DE INUNDACIONES Y ESTABILIZACION DE CAUCE RIO GUADALAJARA
ITEM
ACTIVIDAD
UNID.
CANT.
Vr.UNITARIO
Vr.TOTAL
C-2 Muro puente La Libertad - restaurante Don Carlos margen derecha (longitud=251.0m)
Gl
$ 1,554,245
$ 1,554,245
1.1 Campamento
1.2 Localizacin y replanteo
m
251.00
$ 1,306
$ 327,898
Manejo de cauces durante la
Gl
1
$ 5,000,000
1.3 construccin
1.4
4
5
5.1
5.2
5.3
5.4
7
7.1
7.2
7.3
8
8.1
m3
0.00
$ 147,380
$0
m3
0.00
$ 6,119
$0
m3
0.00
$ 8,355
$0
m3
0.00
$ 1,603
$0
m3
50.20
$ 11,083
$ 556,349
m3
238.81
$ 3,236
$ 772,674
m3
0.00
$ 14,580
$0
m3
0.00
$ 6,858
$0
m3
289.01
$ 2,008
$ 580,406
m2
12.55
$ 25,206
$ 316,334
105.92
$ 451,562
$ 47,830,354
158.88
$ 501,736
$ 79,717,257
22,934.76
$ 2,757
$ 63,231,136
$ 199,886,654
6 de 8
Cuadro 11-1
MUNICIPIO DE BUGA
PRESUPUESTO DE OBRA
OBRAS DE CONTROL DE INUNDACIONES Y ESTABILIZACION DE CAUCE RIO GUADALAJARA
ITEM
ACTIVIDAD
UNID.
CANT.
Vr.UNITARIO
Vr.TOTAL
m3
15.00
$ 147,380
$ 2,210,702
m3
15.00
$ 6,119
$ 91,782
m3
0.00
$ 8,355
$0
m3
0.00
$ 1,603
$0
m3
88.80
$ 11,083
$ 984,139
m3
422.43
$ 3,236
$ 1,366,802
m3
0.00
$ 14,580
$0
m3
0.00
$ 6,858
$0
m3
511.23
$ 2,008
$ 1,026,694
m2
22.20
$ 25,206
$ 559,571
187.37
$ 451,562
$ 84,608,276
281.05
$ 501,736
$ 141,013,794
$ 2,757
$ 111,851,094
$ 350,847,126
40,569.86
7 de 8
Cuadro 11-1
MUNICIPIO DE BUGA
PRESUPUESTO DE OBRA
OBRAS DE CONTROL DE INUNDACIONES Y ESTABILIZACION DE CAUCE RIO GUADALAJARA
ITEM
ACTIVIDAD
UNID.
CANT.
Vr.UNITARIO
$ 1,554,245
Vr.TOTAL
$ 1,554,245
$ 1,500,000
$ 147,380
$ 50,000,000
$ 2,210,702
$ 6,119
$ 91,782
$ 8,355
$0
$ 1,603
$0
$ 11,083
$ 926,398
$ 3,236
$ 1,838,238
$ 14,580
$0
$ 6,858
$0
$ 2,008
$ 1,095,046
$ 4,017
$ 1,304,184
$ 25,206
$ 3,588,312
$ 541,874
$ 45,295,285
$ 602,083
$ 35,384,401
$ 2,757
$ 33,993,725
$ 40,000
$ 5,600,000
$ 184,382,320
$ 1,205,238,586
$ 301,309,646
$ 1,506,548,232
8 de 8
61
HIDROINGENIERIA LTDA
ANEXOS
ANEXO HIDROLOGICO
ANEXO HIDRAULICO
940
0
1000
2000
Main Channel Distance (m)
3000
Seccin 41
Seccin 40
Seccion 39
Seccion 38
Seccion 37
Seccion 36
Seccin 35 Folmes
Seccin 34 Folmes
Seccion 33 Folmes
Seccion 32 folmes
1040
Seccin 3 Folmes
Seccin 5 Folmes
Seccion 7 Folmes
Seccion 9 Folmes
Seccion 14 Folmes
Seccion 17 Folmes
Seccion 20 folmes
Secin 23 folmes
Seccin 26 Folmes
Seccion 30 Folmes
Seccin 40 Top...
Seccin 41 Top:...
Seccin 39 To...
Seccin 32 ...
Seccin 33 ...
Puente Carrer...
Secc...
Secci...
Puent...
Secci...
Seccin...
Seccin ...
Seccin 31...
Sec...
Secc...
Se...
S...
Elevation (m)
WS 100
WS 50
WS 25
1020
WS 10
WS 5
Ground
LOB
ROB
1000
980
960
4000
5000
960
1600
1800
2000
Seccion 28 Folmes
Seccin 26 Folmes
Puente carrera 9
Seccin 25 Folmes
Seccion 24 Folmes
Secin 23 folmes
Seccion 22 Folmes
Seccion 21 Folmes
Seccion 20 folmes
Seccion 19 Folmes
Seccion 18 Folmes
Seccion 17 Folmes
Seccin 16 Folmes
Seccion 15 Folmes
Seccion 9 Folmes
Seccion 10 folmes
Seccion 11 Folmes
Seccion 12 Folmes
Seccin 13 Folmes
Seccion 14 Folmes
Seccion 8 Folmes
Seccion 7 Folmes
Seccion 6 Folme...
Seccin 5 Folm...
Seccin 4 Fol...
Seccin 3 F...
Seccin ...
Seccin...
Elevation (m)
980
Guadalajara Principal
Legend
WS 100
WS 50
WS 25
WS 10
975
WS 5
Ground
LOB
ROB
970
965
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
109.52
940.45
942.27
941.87
942.39
0.011608
1.54
71.10
69.83
0.49
Principal
10
137.94
940.45
942.43
941.98
942.57
0.011611
1.68
81.92
70.34
0.50
Principal
25
173.85
940.45
942.60
942.11
942.78
0.011610
1.84
94.48
70.91
0.51
Principal
50
200.49
940.45
942.73
942.20
942.92
0.011605
1.94
103.21
71.31
0.52
Principal
100
226.93
940.45
942.84
942.28
943.05
0.011602
2.04
111.45
71.69
0.52
Principal
109.52
941.35
943.18
943.30
0.008860
1.58
69.44
53.96
0.44
Principal
10
137.94
941.35
943.36
943.51
0.009434
1.74
79.44
55.91
0.47
Principal
25
173.85
941.35
943.56
943.75
0.009984
1.91
91.08
57.93
0.49
Principal
50
200.49
941.35
943.69
943.90
0.010264
2.03
98.71
58.31
0.50
Principal
100
226.93
941.35
943.82
944.05
0.010479
2.14
105.98
58.68
0.51
Principal
109.52
941.91
944.13
944.22
0.007679
1.36
80.39
69.12
0.40
Principal
10
137.94
941.91
944.32
944.43
0.007282
1.47
94.11
69.51
0.40
Principal
25
173.85
941.91
944.55
944.68
0.007014
1.58
109.73
69.96
0.40
Principal
50
200.49
941.91
944.70
944.84
0.006940
1.67
120.19
70.25
0.41
Principal
100
226.93
941.91
944.84
944.99
0.006897
1.75
129.99
70.52
0.41
Principal
109.52
943.45
945.21
945.37
0.012221
1.78
61.61
50.27
0.51
Principal
10
137.94
943.45
945.38
945.57
0.012704
1.97
70.16
50.45
0.53
Principal
25
173.85
943.45
945.57
945.81
0.013093
2.17
80.17
50.66
0.55
Principal
50
200.49
943.45
945.74
946.00
0.013921
2.24
89.54
56.52
0.57
Principal
100
226.93
943.45
945.87
946.15
0.013917
2.35
96.73
56.85
0.57
Principal
109.52
944.48
946.11
946.19
0.007258
1.25
87.29
82.37
0.39
Principal
10
137.94
944.48
946.32
946.40
0.007148
1.31
105.15
91.78
0.39
Principal
25
173.85
944.48
946.54
946.63
0.006799
1.37
126.71
99.60
0.39
Principal
50
200.49
944.48
946.70
946.80
0.006192
1.41
142.47
100.45
0.38
Principal
100
226.93
944.48
946.83
946.93
0.005975
1.46
155.56
101.15
0.38
Principal
109.52
945.27
947.01
947.14
0.012822
1.61
67.86
66.37
0.51
Principal
10
137.94
945.27
947.19
947.34
0.012560
1.71
80.59
71.07
0.51
Principal
25
173.85
945.27
947.37
947.55
0.012447
1.86
93.38
71.94
0.52
Principal
50
200.49
945.27
947.48
947.68
0.012781
1.98
101.06
72.09
0.53
Principal
100
226.93
945.27
947.58
947.81
0.012908
2.09
108.69
72.23
0.54
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
109.52
945.36
947.30
947.42
0.009329
1.48
74.10
65.99
0.45
Principal
10
137.94
945.36
947.49
947.62
0.009404
1.60
86.31
68.65
0.45
Principal
25
173.85
945.36
947.67
947.83
0.009879
1.75
99.31
71.37
0.47
Principal
50
200.49
945.36
947.79
947.97
0.010211
1.86
107.95
72.68
0.49
Principal
100
226.93
945.36
947.90
948.10
0.010353
1.95
116.13
73.10
0.49
Principal
109.52
945.67
947.48
947.64
0.012104
1.79
61.16
49.19
0.51
Principal
10
137.94
945.67
947.65
947.85
0.012573
1.98
69.77
49.63
0.53
Principal
25
173.85
945.67
947.84
948.08
0.013583
2.20
78.96
50.51
0.56
Principal
50
200.49
945.67
947.96
948.24
0.015073
2.34
85.54
53.87
0.59
Principal
100
226.93
945.67
948.08
948.39
0.016356
2.47
91.91
56.94
0.62
Principal
109.52
945.72
947.72
947.89
0.012421
1.83
59.72
47.33
0.52
Principal
10
137.94
945.72
947.90
948.11
0.012970
2.01
68.64
48.90
0.54
Principal
25
173.85
945.72
948.11
948.36
0.013627
2.20
78.85
50.64
0.56
Principal
50
200.49
945.72
948.26
948.53
0.013780
2.32
86.50
51.91
0.57
Principal
100
226.93
945.72
948.39
948.69
0.014013
2.43
93.55
53.05
0.58
Principal
10
109.52
945.50
947.98
948.16
0.011563
1.87
58.54
42.09
0.51
Principal
10
10
137.94
945.50
948.17
948.39
0.012249
2.06
66.95
43.43
0.53
Principal
10
25
173.85
945.50
948.39
948.65
0.013023
2.27
76.59
44.92
0.55
Principal
10
50
200.49
945.50
948.54
948.84
0.013417
2.40
83.47
45.96
0.57
Principal
10
100
226.93
945.50
948.68
949.01
0.013775
2.53
89.85
46.74
0.58
Principal
11
109.52
945.72
948.09
948.27
0.010989
1.87
58.51
40.25
0.50
Principal
11
10
137.94
945.72
948.29
948.51
0.011581
2.07
66.72
41.01
0.52
Principal
11
25
173.85
945.72
948.52
948.78
0.012315
2.29
76.00
41.94
0.54
Principal
11
50
200.49
945.72
948.67
948.97
0.012664
2.43
82.43
42.26
0.56
Principal
11
100
226.93
945.72
948.81
949.14
0.013049
2.57
88.31
42.54
0.57
Principal
12
109.52
946.12
948.17
948.40
0.012966
2.13
51.39
32.57
0.54
Principal
12
10
137.94
946.12
948.37
948.66
0.014134
2.38
57.85
32.86
0.57
Principal
12
25
173.85
946.12
948.58
948.95
0.015575
2.68
64.97
33.18
0.61
Principal
12
50
200.49
946.12
948.73
949.15
0.016566
2.87
69.77
33.39
0.63
Principal
12
100
226.93
946.12
948.86
949.34
0.017572
3.06
74.11
33.58
0.66
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
13
109.52
946.33
948.29
948.52
0.013514
2.16
50.81
33.09
0.56
Principal
13
10
137.94
946.33
948.51
948.79
0.015465
2.36
58.44
36.76
0.60
Principal
13
25
173.85
946.33
948.75
949.09
0.015514
2.57
67.53
37.16
0.61
Principal
13
50
200.49
946.33
948.92
949.30
0.015578
2.72
73.78
37.41
0.62
Principal
13
100
226.93
946.33
949.08
949.49
0.015687
2.85
79.63
37.64
0.63
Principal
14
109.52
946.20
948.48
948.65
0.008386
1.80
60.81
36.17
0.44
Principal
14
10
137.94
946.20
948.73
948.93
0.008651
1.98
69.76
36.73
0.46
Principal
14
25
173.85
946.20
948.99
949.23
0.009191
2.19
79.38
37.32
0.48
Principal
14
50
200.49
946.20
949.17
949.44
0.009799
2.32
86.28
38.90
0.50
Principal
14
100
226.93
946.20
949.34
949.64
0.010302
2.44
93.06
40.47
0.51
Principal
15
109.52
945.98
948.60
948.73
0.006151
1.61
68.12
38.23
0.38
Principal
15
10
137.94
945.98
948.85
949.01
0.006395
1.77
77.95
38.85
0.40
Principal
15
25
173.85
945.98
949.13
949.32
0.006788
1.96
88.72
39.51
0.42
Principal
15
50
200.49
945.98
949.32
949.54
0.006995
2.08
96.34
39.97
0.43
Principal
15
100
226.93
945.98
949.50
949.74
0.007167
2.19
103.48
40.25
0.44
Principal
16
109.52
945.72
948.68
948.79
0.005046
1.45
75.43
42.36
0.35
Principal
16
10
137.94
945.72
948.94
949.07
0.005136
1.59
86.59
42.45
0.36
Principal
16
25
173.85
945.72
949.23
949.39
0.005385
1.76
98.76
42.77
0.37
Principal
16
50
200.49
945.72
949.43
949.61
0.005636
1.87
107.44
43.98
0.38
Principal
16
100
226.93
945.72
949.61
949.81
0.005785
1.96
115.69
44.65
0.39
Principal
17
Principal
18
109.52
946.04
948.77
947.84
948.89
0.005485
1.51
72.46
41.49
0.37
Principal
18
10
137.94
946.04
949.04
948.01
949.18
0.005578
1.65
83.59
42.25
0.37
Principal
18
25
173.85
946.04
949.33
948.20
949.50
0.005816
1.81
96.12
43.51
0.39
Principal
18
50
200.49
946.04
949.54
948.33
949.72
0.005967
1.91
105.21
44.88
0.40
Principal
18
100
226.93
946.04
949.73
948.45
949.93
0.006099
1.99
113.87
46.15
0.40
Principal
19
Principal
20
109.52
946.36
948.85
948.04
948.97
0.006401
1.53
71.58
44.58
0.39
Principal
20
10
137.94
946.36
949.12
948.20
949.26
0.006166
1.65
83.52
44.66
0.39
Bridge
Bridge
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
20
25
173.85
946.36
949.42
948.38
949.58
0.006184
1.79
96.94
45.56
0.39
Principal
20
50
200.49
946.36
949.63
948.50
949.81
0.006226
1.88
106.64
46.79
0.40
Principal
20
100
226.93
946.36
949.82
948.62
950.02
0.006272
1.96
115.84
47.93
0.40
Principal
21
109.52
946.45
948.94
949.08
0.008898
1.68
65.38
44.64
0.44
Principal
21
10
137.94
946.45
949.20
949.36
0.008325
1.79
77.18
45.33
0.44
Principal
21
25
173.85
946.45
949.50
949.68
0.007922
1.92
90.77
46.10
0.44
Principal
21
50
200.49
946.45
949.71
949.91
0.007660
2.00
100.46
46.65
0.43
Principal
21
100
226.93
946.45
949.90
950.12
0.007490
2.07
109.53
47.15
0.43
Principal
22
109.52
946.34
948.99
949.14
0.010187
1.75
62.66
44.61
0.47
Principal
22
10
137.94
946.34
949.24
949.42
0.009446
1.86
74.30
45.43
0.46
Principal
22
25
173.85
946.34
949.54
949.74
0.008895
1.98
87.82
46.38
0.46
Principal
22
50
200.49
946.34
949.75
949.96
0.008545
2.06
97.52
47.04
0.46
Principal
22
100
226.93
946.34
949.94
950.17
0.008307
2.13
106.63
47.65
0.45
Principal
23
109.52
945.76
949.05
949.22
0.011776
1.81
60.41
43.69
0.49
Principal
23
10
137.94
945.76
949.31
949.50
0.011866
1.89
73.07
50.07
0.50
Principal
23
25
173.85
945.76
949.61
949.81
0.010417
1.98
87.72
50.35
0.48
Principal
23
50
200.49
945.76
949.81
950.03
0.009623
2.04
98.19
50.55
0.47
Principal
23
100
226.93
945.76
950.01
950.23
0.009106
2.10
107.95
50.85
0.46
Principal
24
109.52
946.57
949.17
949.31
0.010348
1.67
65.69
52.35
0.48
Principal
24
10
137.94
946.57
949.43
949.58
0.009084
1.74
79.25
53.47
0.46
Principal
24
25
173.85
946.57
949.71
949.88
0.008177
1.84
94.42
53.77
0.44
Principal
24
50
200.49
946.57
949.91
950.10
0.007635
1.90
105.35
53.98
0.43
Principal
24
100
226.93
946.57
950.10
950.30
0.007244
1.96
115.65
54.18
0.43
Principal
25
109.52
947.09
949.27
949.42
0.010292
1.67
65.52
51.56
0.47
Principal
25
10
137.94
947.09
949.51
949.67
0.009258
1.77
77.96
51.63
0.46
Principal
25
25
173.85
947.09
949.79
949.97
0.008586
1.89
92.03
51.82
0.45
Principal
25
50
200.49
947.09
949.98
950.18
0.008140
1.96
102.24
52.08
0.45
Principal
25
100
226.93
947.09
950.17
950.38
0.007803
2.03
111.91
52.31
0.44
Principal
26
109.52
947.45
949.47
949.63
0.012630
1.78
61.67
51.78
0.52
Principal
26
10
137.94
947.45
949.68
949.87
0.011539
1.89
73.02
51.81
0.51
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
26
25
173.85
947.45
949.94
950.15
0.010635
2.01
86.30
51.85
Principal
26
50
200.49
947.45
950.13
950.35
0.010028
2.09
95.94
51.87
0.49
Principal
26
100
226.93
947.45
950.30
950.54
0.009552
2.16
105.13
51.90
0.48
Principal
27
109.52
947.91
949.80
950.01
0.019453
2.04
53.68
48.67
0.62
Principal
27
10
137.94
947.91
949.99
950.23
0.019013
2.19
63.09
50.42
0.62
Principal
27
25
173.85
947.91
950.22
950.50
0.018298
2.32
75.03
53.14
0.62
Principal
27
50
200.49
947.91
950.39
950.68
0.017702
2.37
84.44
56.14
0.62
Principal
27
100
226.93
947.91
950.56
950.86
0.016916
2.41
94.02
58.84
0.61
Principal
28
109.52
946.60
950.19
950.28
0.006215
1.31
83.75
61.64
0.36
Principal
28
10
137.94
946.60
950.40
950.50
0.006299
1.43
96.58
62.92
0.37
Principal
28
25
173.85
946.60
950.64
950.76
0.006305
1.55
111.86
64.26
0.38
Principal
28
50
200.49
946.60
950.81
950.94
0.006237
1.63
122.72
64.85
0.38
Principal
28
100
226.93
946.60
950.96
951.11
0.006176
1.71
132.98
65.20
0.38
Principal
29
109.52
948.51
950.28
950.28
950.64
0.056586
2.68
40.88
57.25
1.01
Principal
29
10
137.94
948.51
950.44
950.40
950.83
0.045116
2.74
50.40
57.45
0.93
Principal
29
25
173.85
948.51
950.69
951.06
0.033424
2.69
64.58
60.08
0.83
Principal
29
50
200.49
948.51
950.85
951.22
0.028580
2.68
74.85
62.28
0.78
Principal
29
100
226.93
948.51
951.01
951.38
0.024914
2.68
84.65
63.30
0.74
Principal
30
109.52
949.40
952.12
951.58
952.24
0.009082
1.54
71.10
57.91
0.44
Principal
30
10
137.94
949.40
952.27
951.70
952.42
0.009989
1.73
79.63
58.33
0.47
Principal
30
25
173.85
949.40
952.41
951.84
952.61
0.011366
1.97
88.32
58.76
0.51
Principal
30
50
200.49
949.40
952.52
951.95
952.75
0.012149
2.12
94.54
59.06
0.54
Principal
30
100
226.93
949.40
952.61
952.04
952.88
0.012978
2.27
100.05
59.33
0.56
Principal
31
109.52
951.45
953.24
953.47
0.019200
2.15
51.02
44.06
0.64
Principal
31
10
137.94
951.45
953.48
953.73
0.019639
2.18
63.39
54.61
0.64
Principal
31
25
173.85
951.45
953.69
953.97
0.018228
2.33
74.77
54.97
0.64
Principal
31
50
200.49
951.45
953.83
954.13
0.017622
2.43
82.49
55.21
0.63
Principal
31
100
226.93
951.45
953.96
954.29
0.017155
2.53
89.79
55.43
0.63
Principal
32
109.52
952.68
954.68
954.84
0.010276
1.77
61.84
44.69
0.48
Principal
32
10
137.94
952.68
954.91
955.09
0.010197
1.91
72.28
46.40
0.49
949.38
0.50
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
32
25
173.85
952.68
955.12
955.35
0.010953
2.11
82.41
47.99
Principal
32
50
200.49
952.68
955.27
955.52
0.011402
2.24
89.42
48.96
0.51
0.53
Principal
32
100
226.93
952.68
955.40
955.68
0.011721
2.36
96.00
49.52
0.54
Principal
33
109.52
952.69
955.46
955.66
0.012731
1.99
54.93
37.22
0.52
Principal
33
10
137.94
952.69
955.68
955.92
0.013022
2.17
63.49
38.34
0.54
Principal
33
25
173.85
952.69
955.94
956.22
0.013386
2.37
73.38
39.61
0.56
Principal
33
50
200.49
952.69
956.11
956.43
0.013668
2.50
80.17
40.45
0.57
Principal
33
100
226.93
952.69
956.26
956.61
0.013993
2.62
86.45
41.22
0.58
Principal
33.5
Principal
34
109.52
952.74
955.64
954.88
955.80
0.008385
1.79
61.05
35.30
0.44
Principal
34
10
137.94
952.74
955.88
955.05
956.08
0.008787
1.98
69.51
35.48
0.45
Principal
34
25
173.85
952.74
956.14
955.25
956.39
0.009412
2.21
78.68
35.68
0.47
Principal
34
50
200.49
952.74
956.31
955.39
956.60
0.009829
2.36
84.93
35.82
0.49
Principal
34
100
226.93
952.74
956.47
955.52
956.79
0.010226
2.50
90.72
35.94
0.50
Principal
35
109.52
953.83
955.81
956.02
0.014115
2.03
53.88
39.31
0.55
Principal
35
10
137.94
953.83
956.05
956.29
0.013254
2.17
63.47
39.69
0.55
Principal
35
25
173.85
953.83
956.32
956.60
0.012845
2.34
74.23
40.29
0.55
Principal
35
50
200.49
953.83
956.51
956.81
0.012665
2.46
81.66
40.70
0.55
Principal
35
100
226.93
953.83
956.68
957.01
0.012557
2.56
88.63
41.09
0.56
Principal
36
109.52
954.72
956.42
956.68
0.023345
2.27
48.35
43.13
0.68
Principal
36
10
137.94
954.72
956.62
956.92
0.022215
2.41
57.35
44.96
0.68
Principal
36
25
173.85
954.72
956.87
957.20
0.020718
2.53
68.65
47.17
0.67
Principal
36
50
200.49
954.72
957.04
957.39
0.019735
2.61
76.91
48.71
0.66
Principal
36
100
226.93
954.72
957.20
957.57
0.018871
2.67
85.02
50.18
0.65
Principal
36.5
Principal
37
109.52
954.87
956.72
956.22
956.89
0.012428
1.83
59.91
46.03
0.51
Principal
37
10
137.94
954.87
956.93
956.37
957.13
0.012071
1.98
69.65
46.10
0.51
Principal
37
25
173.85
954.87
957.17
956.54
957.41
0.011802
2.15
80.89
46.19
0.52
Principal
37
50
200.49
954.87
957.34
956.65
957.60
0.011721
2.26
88.53
46.25
0.52
Bridge
Bridge
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
226.93
954.87
957.49
956.76
957.78
0.011683
2.37
95.70
46.30
Froude # Chl
Principal
37
100
0.53
Principal
38
109.52
955.24
956.98
957.21
0.014203
2.12
51.54
35.99
0.57
Principal
38
10
137.94
955.24
957.18
957.46
0.014958
2.35
58.80
36.63
0.59
Principal
38
25
173.85
955.24
957.41
957.75
0.015660
2.58
67.29
37.35
0.61
Principal
38
50
200.49
955.24
957.57
957.95
0.016494
2.73
73.46
38.97
0.63
Principal
38
100
226.93
955.24
957.73
958.14
0.017286
2.85
79.66
40.99
0.65
Principal
39
109.52
956.06
958.30
957.65
958.53
0.012207
2.10
52.18
32.88
0.53
Principal
39
10
137.94
956.06
958.56
957.87
958.82
0.012383
2.27
60.82
34.46
0.54
Principal
39
25
173.85
956.06
958.84
958.11
959.15
0.012539
2.45
70.87
35.89
0.56
Principal
39
50
200.49
956.06
959.05
958.27
959.38
0.012434
2.56
78.25
36.73
0.56
Principal
39
100
226.93
956.06
959.36
958.42
959.67
0.013433
2.45
92.72
49.56
0.57
Principal
40
109.52
957.26
959.63
959.81
0.011983
1.91
57.43
41.10
0.51
Principal
40
10
137.94
957.26
959.89
960.09
0.011569
2.01
68.55
44.01
0.51
Principal
40
25
173.85
957.26
960.18
960.41
0.011135
2.13
81.77
46.84
0.51
Principal
40
50
200.49
957.26
960.36
960.61
0.010739
2.22
90.33
46.95
0.51
Principal
40
100
226.93
957.26
960.60
960.85
0.009390
2.23
101.71
47.09
0.48
Principal
41
109.52
958.99
960.60
960.85
0.018261
2.22
49.24
39.12
0.63
Principal
41
10
137.94
958.99
960.83
961.11
0.017921
2.37
58.25
41.47
0.64
Principal
41
25
173.85
958.99
961.07
961.40
0.017430
2.53
68.75
43.29
0.64
Principal
41
50
200.49
958.99
961.22
961.58
0.017330
2.66
75.28
43.50
0.65
Principal
41
100
226.93
958.99
961.37
961.76
0.017085
2.78
81.70
43.70
0.65
Principal
41.5
Principal
42
109.52
959.00
960.84
960.28
961.03
0.011220
1.93
56.89
38.40
0.50
Principal
42
10
137.94
959.00
961.07
960.44
961.29
0.011356
2.10
65.54
38.89
0.52
Principal
42
25
173.85
959.00
961.31
960.63
961.58
0.011785
2.32
75.00
39.41
0.54
Principal
42
50
200.49
959.00
961.46
960.76
961.77
0.012264
2.47
81.09
39.75
0.55
Principal
42
100
226.93
959.00
961.61
960.89
961.96
0.012621
2.61
86.96
40.07
0.57
Principal
43
109.52
959.25
961.39
961.58
0.010319
1.93
56.81
35.58
0.49
Principal
43
10
137.94
959.25
961.63
961.85
0.010695
2.11
65.34
36.51
0.50
Bridge
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
43
25
173.85
959.25
961.89
962.16
0.011010
2.32
74.90
36.72
Principal
43
50
200.49
959.25
962.06
962.37
0.011269
2.47
81.32
36.77
0.52
0.53
Principal
43
100
226.93
959.25
962.23
962.57
0.011509
2.60
87.34
36.83
0.54
Principal
44
109.52
960.20
962.02
962.42
0.025977
2.80
39.12
27.01
0.74
Principal
44
10
137.94
960.20
962.25
962.72
0.026011
3.03
45.45
27.65
0.76
Principal
44
25
173.85
960.20
962.51
963.07
0.026575
3.31
52.54
28.33
0.78
Principal
44
50
200.49
960.20
962.68
963.30
0.026840
3.50
57.31
28.40
0.79
Principal
44
100
226.93
960.20
962.83
963.52
0.027136
3.67
61.78
28.47
0.80
Principal
45
109.52
960.54
963.04
963.31
0.012620
2.30
47.58
22.37
0.50
Principal
45
10
137.94
960.54
963.32
963.65
0.013636
2.56
53.85
22.55
0.53
Principal
45
25
173.85
960.54
963.63
964.05
0.014769
2.85
60.98
22.76
0.56
Principal
45
50
200.49
960.54
963.84
964.32
0.015589
3.05
65.76
22.89
0.57
Principal
45
100
226.93
960.54
964.04
964.57
0.016337
3.23
70.25
23.02
0.59
Principal
46
109.52
960.86
963.59
963.83
0.009517
2.19
50.05
22.62
0.47
Principal
46
10
137.94
960.86
963.91
964.21
0.009894
2.40
57.44
22.84
0.48
Principal
46
25
173.85
960.86
964.29
964.64
0.010334
2.64
65.95
23.08
0.50
Principal
46
50
200.49
960.86
964.79
965.12
0.017684
2.56
78.21
45.30
0.62
Principal
46
100
226.93
960.86
965.01
965.35
0.015358
2.57
88.19
45.30
0.59
Principal
47
109.52
961.30
964.11
964.44
0.015161
2.55
42.96
20.67
0.56
Principal
47
10
137.94
961.30
964.45
964.84
0.015369
2.76
50.06
21.43
0.58
Principal
47
25
173.85
961.30
964.84
965.29
0.015580
2.97
58.55
22.42
0.59
Principal
47
50
200.49
961.30
965.44
965.83
0.011317
2.77
72.46
23.96
0.51
Principal
47
100
226.93
961.30
965.66
966.09
0.013687
2.91
78.07
28.26
0.56
Principal
48
109.52
962.28
964.91
965.16
0.014387
2.18
50.15
31.76
0.55
Principal
48
10
137.94
962.28
965.25
965.51
0.012591
2.26
61.15
33.19
0.53
Principal
48
25
173.85
962.28
965.64
965.92
0.010896
2.35
74.03
33.33
0.50
Principal
48
50
200.49
962.28
966.04
966.31
0.008619
2.29
87.63
33.99
0.45
Principal
48
100
226.93
962.28
966.31
966.59
0.008046
2.34
96.93
34.16
0.44
Principal
49
109.52
963.56
965.72
965.43
966.05
0.023268
2.57
42.62
31.25
0.70
Principal
49
10
137.94
963.56
965.95
965.61
966.34
0.022167
2.76
49.95
31.34
0.70
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
49
25
173.85
963.56
966.23
965.83
966.68
0.020915
2.96
58.80
31.46
Principal
49
50
200.49
963.56
966.51
965.97
966.96
0.019043
2.96
67.64
33.44
0.69
0.67
Principal
49
100
226.93
963.56
966.75
966.11
967.21
0.018294
2.98
76.22
36.39
0.66
Principal
50
109.52
964.40
966.87
966.51
967.17
0.022289
2.46
44.61
31.33
0.66
Principal
50
10
137.94
964.40
967.08
966.70
967.45
0.022937
2.69
51.30
31.54
0.67
Principal
50
25
173.85
964.40
967.33
966.91
967.77
0.023564
2.94
59.19
32.11
0.69
Principal
50
50
200.49
964.40
967.52
967.06
968.00
0.023280
3.07
65.31
32.54
0.69
Principal
50
100
226.93
964.40
967.71
967.20
968.22
0.022638
3.17
71.58
32.98
0.69
Principal
51
109.52
965.34
967.18
966.88
967.50
0.025203
2.52
43.52
32.70
0.70
Principal
51
10
137.94
965.34
967.40
967.06
967.77
0.024768
2.72
50.72
32.81
0.70
Principal
51
25
173.85
965.34
967.66
967.27
968.09
0.024710
2.93
59.35
33.71
0.70
Principal
51
50
200.49
965.34
967.85
967.40
968.32
0.024174
3.05
65.77
34.37
0.70
Principal
51
100
226.93
965.34
968.03
967.54
968.53
0.023507
3.14
72.16
35.00
0.70
Principal
52
109.52
966.30
968.27
968.27
968.76
0.057466
3.10
35.33
36.22
1.00
Principal
52
10
137.94
966.30
968.44
968.44
969.00
0.054624
3.32
41.54
36.69
1.00
Principal
52
25
173.85
966.30
968.64
968.64
969.28
0.052333
3.55
48.94
37.55
0.99
Principal
52
50
200.49
966.30
968.77
968.77
969.47
0.051509
3.71
54.11
38.38
1.00
Principal
52
100
226.93
966.30
968.91
968.91
969.65
0.050260
3.83
59.29
39.18
0.99
Principal
53
109.52
966.14
968.93
968.32
969.13
0.011537
1.98
55.35
34.03
0.50
Principal
53
10
137.94
966.14
969.14
968.49
969.39
0.012430
2.21
62.44
34.11
0.52
Principal
53
25
173.85
966.14
969.41
968.70
969.70
0.014370
2.42
71.91
38.32
0.56
Principal
53
50
200.49
966.14
969.59
968.83
969.92
0.015522
2.52
79.43
42.25
0.59
Principal
53
100
226.93
966.14
969.76
968.97
970.11
0.016153
2.62
86.59
45.01
0.60
Principal
53.5
Principal
54
109.52
965.56
969.22
968.39
969.39
0.010108
1.84
59.54
32.50
0.43
Principal
54
10
137.94
965.56
969.47
968.59
969.68
0.010637
2.03
67.82
32.91
0.45
Principal
54
25
173.85
965.56
969.78
968.79
970.03
0.010877
2.23
78.11
33.48
0.47
Principal
54
50
200.49
965.56
969.99
968.93
970.27
0.011065
2.35
85.17
33.88
0.47
Principal
54
100
226.93
965.56
970.17
969.07
970.49
0.011445
2.48
91.42
34.39
0.49
Bridge
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
55
109.52
967.37
969.27
969.70
0.024337
2.89
37.91
23.39
0.72
Principal
55
10
137.94
967.37
969.50
970.02
0.025606
3.19
43.22
23.58
0.75
Principal
55
25
173.85
967.37
969.77
970.40
0.026421
3.50
49.66
23.81
0.77
Principal
55
50
200.49
967.37
969.95
970.66
0.027150
3.71
53.99
23.96
0.79
Principal
55
100
226.93
967.37
970.11
970.90
0.028304
3.93
57.73
24.09
0.81
Principal
56
109.52
967.61
969.82
969.32
970.22
0.019262
2.82
38.86
20.28
0.65
Principal
56
10
137.94
967.61
970.08
969.56
970.58
0.020628
3.13
44.13
20.40
0.68
Principal
56
25
173.85
967.61
970.37
969.87
970.98
0.022248
3.47
50.08
20.53
0.71
Principal
56
50
200.49
967.61
970.57
970.06
971.26
0.023346
3.70
54.14
20.63
0.73
Principal
56
100
226.93
967.61
970.75
970.25
971.53
0.024360
3.92
57.94
20.71
0.75
Principal
57
109.52
967.27
970.29
969.42
970.63
0.012877
2.56
42.81
18.69
0.54
Principal
57
10
137.94
967.27
970.61
969.71
971.01
0.014093
2.83
48.80
19.46
0.57
Principal
57
25
173.85
967.27
971.00
970.04
971.47
0.015921
3.06
56.83
21.97
0.61
Principal
57
50
200.49
967.27
971.24
970.28
971.77
0.016044
3.22
62.24
22.03
0.61
Principal
57
100
226.93
967.27
971.48
970.49
972.05
0.016305
3.36
67.48
22.38
0.62
Principal
58
109.52
966.82
970.74
969.48
970.92
0.007319
1.90
57.51
25.23
0.40
Principal
58
10
137.94
966.82
971.12
969.74
971.33
0.007480
2.05
67.33
26.77
0.41
Principal
58
25
173.85
966.82
971.61
970.05
971.74
0.004688
1.69
111.87
49.59
0.32
Principal
58
50
200.49
966.82
971.90
970.25
972.03
0.004378
1.71
126.42
50.77
0.32
Principal
58
100
226.93
966.82
972.18
970.44
972.31
0.004108
1.72
140.67
51.90
0.31
Principal
59
109.52
967.40
970.95
971.07
0.005238
1.50
73.22
36.15
0.34
Principal
59
10
137.94
967.40
971.35
971.47
0.005080
1.56
88.17
39.57
0.33
Principal
59
25
173.85
967.40
971.71
971.86
0.005398
1.68
103.33
43.70
0.35
Principal
59
50
200.49
967.40
971.99
972.15
0.005398
1.73
115.85
47.18
0.35
Principal
59
100
226.93
967.40
972.27
972.42
0.005326
1.75
129.92
51.88
0.35
Principal
60
109.52
968.14
971.10
970.20
971.27
0.010720
1.84
59.48
36.29
0.46
Principal
60
10
137.94
968.14
971.48
970.44
971.66
0.008743
1.88
73.46
37.08
0.43
Principal
60
25
173.85
968.14
971.84
970.71
972.04
0.008197
2.00
86.96
37.84
0.42
Principal
60
50
200.49
968.14
972.12
970.90
972.33
0.007658
2.06
97.45
38.41
0.41
Principal
60
100
226.93
968.14
972.41
971.03
972.61
0.008578
1.97
122.12
86.36
0.44
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
61
109.52
968.57
971.35
970.34
971.50
0.006568
1.71
63.94
31.67
0.38
Principal
61
10
137.94
968.57
971.69
970.53
971.86
0.006421
1.84
74.87
32.45
0.39
Principal
61
25
173.85
968.57
972.04
970.75
972.24
0.006649
2.01
86.36
33.45
0.40
Principal
61
50
200.49
968.57
972.30
970.91
972.52
0.006606
2.10
95.25
34.20
0.40
Principal
61
100
226.93
968.57
972.59
971.04
972.81
0.005971
2.10
112.33
45.28
0.39
Principal
62
109.52
969.05
971.53
970.63
971.73
0.009756
2.00
54.71
26.55
0.45
Principal
62
10
137.94
969.05
971.85
970.84
972.10
0.009737
2.17
63.52
26.94
0.45
Principal
62
25
173.85
969.05
972.20
971.09
972.49
0.010120
2.38
72.90
27.35
0.47
Principal
62
50
200.49
969.05
972.46
971.26
972.78
0.010339
2.51
79.98
28.21
0.48
Principal
62
100
226.93
969.05
972.73
971.42
973.04
0.009993
2.52
93.89
41.50
0.47
Principal
63
109.52
969.64
971.78
971.41
972.21
0.029665
2.90
37.81
22.42
0.71
Principal
63
10
137.94
969.64
972.08
971.66
972.57
0.027978
3.08
44.74
22.99
0.71
Principal
63
25
173.85
969.64
972.42
971.93
972.98
0.027227
3.31
52.52
23.60
0.71
Principal
63
50
200.49
969.64
972.68
972.11
973.27
0.027733
3.40
59.00
26.21
0.72
Principal
63
100
226.93
969.64
972.93
972.30
973.52
0.025135
3.43
68.34
36.15
0.69
Principal
64
109.52
969.63
972.29
971.42
972.57
0.011499
2.36
46.49
20.79
0.50
Principal
64
10
137.94
969.63
972.61
971.67
972.95
0.012939
2.57
53.62
23.14
0.54
Principal
64
25
173.85
969.63
972.99
971.96
973.38
0.014319
2.76
62.98
26.77
0.57
Principal
64
50
200.49
969.63
973.28
972.17
973.68
0.014509
2.82
71.05
29.81
0.58
Principal
64
100
226.93
969.63
973.48
972.38
973.91
0.014529
2.90
81.36
51.83
0.59
Principal
65
109.52
970.02
972.61
971.67
972.84
0.009600
2.15
50.89
22.80
0.46
Principal
65
10
137.94
970.02
972.98
971.89
973.25
0.010075
2.30
59.89
25.14
0.48
Principal
65
25
173.85
970.02
973.38
972.16
973.69
0.010199
2.47
70.35
26.66
0.49
Principal
65
50
200.49
970.02
973.67
972.35
974.00
0.010459
2.56
78.26
28.78
0.50
Principal
65
100
226.93
970.02
973.87
972.52
974.24
0.011132
2.70
84.18
30.16
0.51
Principal
66
109.52
970.55
972.88
973.18
0.015368
2.44
44.87
24.69
0.58
Principal
66
10
137.94
970.55
973.25
973.58
0.014121
2.54
54.28
26.06
0.56
Principal
66
25
173.85
970.55
973.67
974.02
0.014205
2.63
66.08
30.64
0.57
Principal
66
50
200.49
970.55
973.96
974.32
0.013321
2.66
75.43
36.68
0.56
Principal
66
100
226.93
970.55
974.18
974.56
0.012654
2.74
85.09
47.38
0.55
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
Principal
67
109.52
971.22
973.44
972.96
973.73
0.015633
2.36
46.40
28.44
0.59
Principal
67
10
137.94
971.22
973.76
973.15
974.08
0.014086
2.49
55.46
28.62
0.57
Principal
67
25
173.85
971.22
974.15
973.38
974.49
0.012654
2.61
66.49
28.84
0.55
Principal
67
50
200.49
971.22
974.40
973.54
974.78
0.012459
2.71
74.08
30.02
0.55
Principal
67
100
226.93
971.22
974.63
973.69
975.03
0.013941
2.79
81.31
34.57
0.58
Principal
67.5
Principal
68
109.52
971.40
973.65
973.33
974.00
0.022535
2.59
42.31
29.12
0.69
Principal
68
10
137.94
971.40
973.94
973.51
974.32
0.020146
2.73
50.62
29.20
0.66
Principal
68
25
173.85
971.40
974.29
973.74
974.71
0.017676
2.85
61.02
29.30
0.63
Principal
68
50
200.49
971.40
974.54
973.89
974.98
0.016469
2.94
68.30
29.37
0.61
Principal
68
100
226.93
971.40
974.77
974.03
975.24
0.015674
3.02
75.08
29.44
0.60
Principal
69
109.52
971.82
974.19
974.44
0.013705
2.23
49.19
29.64
0.55
Principal
69
10
137.94
971.82
974.44
974.74
0.013992
2.42
57.03
30.70
0.57
Principal
69
25
173.85
971.82
974.76
975.10
0.013650
2.61
66.68
31.24
0.57
Principal
69
50
200.49
971.82
974.98
975.36
0.013284
2.72
73.76
31.63
0.57
Principal
69
100
226.93
971.82
975.20
975.60
0.012930
2.81
80.64
32.01
0.57
Principal
70
109.52
972.47
974.53
974.79
0.017105
2.25
48.66
33.07
0.59
Principal
70
10
137.94
972.47
974.81
975.10
0.016772
2.37
58.30
36.31
0.60
Principal
70
25
173.85
972.47
975.13
975.44
0.015504
2.48
70.12
38.31
0.58
Principal
70
50
200.49
972.47
975.35
975.68
0.014572
2.54
78.98
39.71
0.57
Principal
70
100
226.93
972.47
975.57
975.91
0.013716
2.58
87.84
41.05
0.56
Principal
71
109.52
971.54
974.85
973.33
974.92
0.002375
1.17
93.60
38.14
0.24
Principal
71
10
137.94
971.54
975.15
973.49
975.24
0.002627
1.32
104.88
38.26
0.25
Principal
71
25
173.85
971.54
975.48
975.59
0.002919
1.48
117.45
38.40
0.27
Principal
71
50
200.49
971.54
975.71
975.83
0.003097
1.59
126.22
38.49
0.28
Principal
71
100
226.93
971.54
975.92
976.07
0.003249
1.69
134.55
38.58
0.29
Principal
72
109.52
973.01
974.84
974.84
975.34
0.050929
3.13
34.99
35.16
1.00
Principal
72
10
137.94
973.01
975.01
975.01
975.59
0.048796
3.36
41.01
35.66
1.00
Principal
72
25
173.85
973.01
975.31
975.21
975.89
0.037217
3.35
51.86
36.70
0.90
Principal
72
50
200.49
973.01
975.57
976.12
0.029228
3.26
61.48
37.60
0.81
Bridge
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
226.93
973.01
975.81
976.34
Principal
72
100
Principal
73
109.52
975.06
977.19
977.40
0.010012
2.00
54.73
30.74
0.48
Principal
73
10
137.94
975.06
977.44
977.69
0.010523
2.21
62.36
30.91
0.50
Principal
73
25
173.85
975.06
977.67
977.99
0.012163
2.50
69.41
31.71
0.54
Principal
73
50
200.49
975.06
977.79
978.17
0.013789
2.73
73.45
32.35
0.58
Principal
73
100
226.93
975.06
977.96
978.38
0.015412
2.87
79.18
35.33
0.61
Principal
74
109.52
976.70
978.52
978.83
0.021022
2.46
44.56
33.44
0.68
Principal
74
10
137.94
976.70
978.77
979.12
0.019387
2.61
52.84
33.88
0.67
Principal
74
25
173.85
976.70
979.07
979.46
0.017568
2.75
63.12
34.43
0.65
Principal
74
50
200.49
976.70
979.28
979.69
0.016598
2.85
70.38
34.81
0.64
Principal
74
100
226.93
976.70
979.50
979.93
0.015439
2.91
77.98
35.20
0.62
Principal
75
109.52
979.71
982.86
982.55
983.00
0.016863
1.64
66.92
79.34
0.57
Principal
75
10
137.94
979.71
982.99
982.67
983.15
0.017080
1.80
76.72
79.67
0.58
Principal
75
25
173.85
979.71
983.13
982.80
983.33
0.017269
1.97
88.06
80.05
0.60
Principal
75
50
200.49
979.71
983.23
982.88
983.45
0.017221
2.08
96.16
80.32
0.61
Principal
75
100
226.93
979.71
983.32
982.95
983.57
0.017348
2.19
103.51
80.57
0.62
Principal
76
109.52
981.70
986.43
986.07
986.62
0.018994
1.95
56.22
51.03
0.59
Principal
76
10
137.94
981.70
986.59
986.82
0.019279
2.14
64.53
51.44
0.61
Principal
76
25
173.85
981.70
986.77
987.06
0.019618
2.35
74.07
51.91
0.63
Principal
76
50
200.49
981.70
986.90
987.21
0.020014
2.49
80.43
52.22
0.64
Principal
76
100
226.93
981.70
987.01
987.36
0.020197
2.62
86.63
52.53
0.65
Principal
77
109.52
988.93
991.12
990.64
991.40
0.021698
2.33
46.93
38.97
0.68
Principal
77
10
137.94
988.93
991.37
990.85
991.67
0.022033
2.39
57.72
46.53
0.68
Principal
77
25
173.85
988.93
991.63
991.21
991.94
0.022103
2.47
70.50
54.14
0.69
Principal
77
50
200.49
988.93
991.83
991.36
992.13
0.022018
2.44
82.02
63.66
0.69
Principal
77
100
226.93
988.93
991.95
991.51
992.27
0.021738
2.53
89.83
65.62
0.69
Principal
78
109.52
990.55
993.56
992.87
993.71
0.008815
1.69
64.97
42.04
0.43
Principal
78
10
137.94
990.55
993.81
993.02
993.98
0.008767
1.83
75.27
42.58
0.44
Principal
78
25
173.85
990.55
994.07
994.28
0.008929
2.01
86.68
43.17
0.45
Principal
78
50
200.49
990.55
994.26
994.48
0.009035
2.12
94.57
43.57
0.46
986.57
0.024860
3.22
70.49
38.74
Froude # Chl
0.76
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
226.93
990.55
994.41
994.66
0.009362
2.24
101.22
43.91
Froude # Chl
Principal
78
100
0.47
Principal
79
109.52
995.23
996.54
996.40
996.86
0.033157
2.53
43.27
43.87
0.81
Principal
79
10
137.94
995.23
996.71
996.55
997.08
0.031820
2.70
51.09
45.47
0.81
Principal
79
25
173.85
995.23
996.92
996.73
997.34
0.029425
2.86
60.83
46.69
0.80
Principal
79
50
200.49
995.23
997.07
996.84
997.51
0.027924
2.96
67.68
47.17
0.79
Principal
79
100
226.93
995.23
997.22
996.95
997.69
0.026128
3.04
74.77
47.66
0.77
Principal
80
109.52
998.32
1001.30
1000.71
1001.53
0.017412
2.13
51.48
39.80
0.60
Principal
80
10
137.94
998.32
1001.52
1001.00
1001.78
0.018165
2.28
60.61
43.82
0.62
Principal
80
25
173.85
998.32
1001.73
1001.23
1002.04
0.019339
2.48
70.14
46.80
0.65
Principal
80
50
200.49
998.32
1001.85
1001.39
1002.20
0.020087
2.64
75.80
47.09
0.67
Principal
80
100
226.93
998.32
1001.95
1001.54
1002.35
0.021153
2.81
80.63
47.33
0.69
Principal
81
109.52
1002.54
1004.58
1004.38
1004.89
0.029060
2.50
43.75
39.77
0.76
Principal
81
10
137.94
1002.54
1004.78
1004.54
1005.14
0.027316
2.66
51.76
40.59
0.75
Principal
81
25
173.85
1002.54
1005.01
1004.73
1005.42
0.025766
2.83
61.37
41.71
0.75
Principal
81
50
200.49
1002.54
1005.17
1004.86
1005.61
0.025143
2.95
67.99
42.52
0.74
Principal
81
100
226.93
1002.54
1005.32
1004.98
1005.79
0.024330
3.04
74.64
43.32
0.74
Principal
82
109.52
1006.81
1008.63
1008.63
1009.42
0.051966
3.93
27.85
17.88
1.01
Principal
82
10
137.94
1006.81
1008.90
1008.90
1009.81
0.050429
4.23
32.60
17.88
1.00
Principal
82
25
173.85
1006.81
1009.19
1009.19
1010.26
0.050277
4.59
37.90
17.88
1.01
Principal
82
50
200.49
1006.81
1009.40
1009.40
1010.58
0.049941
4.81
41.68
17.88
1.01
Principal
82
100
226.93
1006.81
1009.61
1009.61
1010.88
0.049476
5.00
45.35
17.88
1.00
Principal
82.5
Principal
83
109.52
1006.50
1009.04
1008.64
1009.63
0.027836
3.40
32.19
14.90
0.74
Principal
83
10
137.94
1006.50
1009.30
1008.93
1010.04
0.031508
3.83
36.00
14.94
0.79
Principal
83
25
173.85
1006.50
1009.61
1009.28
1010.54
0.034646
4.27
40.72
14.99
0.83
Principal
83
50
200.49
1006.50
1009.84
1009.52
1010.89
0.036136
4.54
44.21
15.02
0.84
Principal
83
100
226.93
1006.50
1010.06
1009.75
1011.23
0.037546
4.78
47.48
15.06
0.86
Bridge
RS = 83 Seccion 42
WS 100
1010
WS 10
WS 5
1009
Ground
1008
WS 100
WS 50
1011
Elevation (m)
Elevation (m)
WS 25
Legend
1012
WS 50
1011
.07
1013
Legend
1012
WS 25
1010
WS 10
WS 5
1009
Ground
1008
Bank Sta
1007
1006
Bank Sta
1007
10
20
30
40
1006
50
10
20
Station (m)
River = Guadalajara Reach = Principal
BR Puente El Vergel-Derrumbado
50
RS = 82 Seccin 41
WS 100
1010
WS 10
WS 5
1009
Ground
1008
Bank Sta
1007
WS 100
WS 50
1011
Elevation (m)
WS 25
Legend
1012
WS 50
1011
.07
1013
Legend
1012
Elevation (m)
40
.07
1013
30
Station (m)
RS = 82.5
1006
BR Puente El Vergel-Derrumbado
.07
1013
RS = 82.5
WS 25
1010
WS 10
WS 5
1009
Ground
1008
Bank Sta
1007
10
20
30
Station (m)
40
50
1006
10
20
30
Station (m)
40
50
RS = 81 Seccin 40
.07
.07
.07
1014
Legend
.07
Legend
1035
WS 100
1012
WS 100
1030
WS 50
1010
WS 50
WS 25
1025
WS 10
1020
WS 5
1015
Ground
1010
Bank Sta
Elevation (m)
Elevation (m)
1040
1005
1000
WS 25
1008
WS 10
1006
WS 5
1004
Ground
1002
Bank Sta
1000
0
20
40
60
80
100
120
998
140
20
40
Station (m)
RS = 79 Seccion 38
1004
60
80
Station (m)
RS = 78 Seccion 37
.07
WS 100
WS 50
WS 25
1002
WS 25
1000
WS 10
998
WS 5
Ground
Bank Sta
Elevation (m)
WS 50
WS 5
996
Legend
1004
WS 10
998
.07
1006
WS 100
1000
.07
1008
Legend
1002
Elevation (m)
RS = 80 Seccion 39
Ground
996
Bank Sta
994
992
994
20
40
60
Station (m)
80
100
990
10
20
30
40
Station (m)
50
60
70
RS = 77 Seccion 36
.07
.07
998
Legend
.07
Legend
1002
WS 100
1000
WS 50
994
WS 50
WS 25
992
WS 25
990
WS 10
988
WS 5
998
WS 10
996
WS 5
994
Ground
992
Bank Sta
988
WS 100
Ground
986
Bank Sta
984
990
982
0
20
40
60
80
100
980
120
20
40
Station (m)
990
60
80
100
Station (m)
RS = 75 Seccin 34 Folmes
RS = 74 Seccion 33 Folmes
.07
986
Legend
.07
.07
Legend
WS 100
988
WS 100
984
986
WS 25
WS 10
984
WS 5
Ground
982
Elevation (m)
WS 50
Elevation (m)
.07
996
Elevation (m)
Elevation (m)
1004
RS = 76 Seccin 35 Folmes
WS 50
WS 25
982
WS 10
WS 5
980
Ground
Bank Sta
980
978
Bank Sta
978
20
40
60
80
Station (m)
100
120
140
976
20
40
60
Station (m)
80
100
120
RS = 73 Seccion 32 folmes
982
.07
.
0
7
WS 100
979
WS 10
WS 5
978
Ground
977
Legend
WS 100
WS 50
WS 25
977
WS 10
WS 5
976
Ground
975
Bank Sta
976
Bank Sta
974
20
40
60
973
80
20
40
Station (m)
RS = 71 Seccion 30 Folmes
80
100
.07
RS = 70 Seccion 29 folmes
.07
978
WS 100
977
WS 50
WS 25
976
WS 10
975
WS 5
974
Ground
Bank Sta
973
.07
979
Legend
.07
.07
Legend
WS 100
978
WS 50
977
Elevation (m)
Elevation (m)
979
60
Station (m)
WS 25
976
WS 10
WS 5
975
Ground
974
Bank Sta
973
972
971
.07
978
Elevation (m)
Elevation (m)
WS 25
.07
979
WS 50
980
.07
980
Legend
981
975
RS = 72 Seccin 31 Folmes
20
40
60
Station (m)
80
100
972
20
40
Station (m)
60
80
RS = 69 Seccion 28 Folmes
.07
.07
978
WS 100
977
WS 50
WS 25
976
WS 10
975
WS 5
974
Ground
973
Bank Sta
.07
Legend
WS 100
976
WS 50
975
WS 25
WS 10
974
WS 5
Ground
973
Bank Sta
972
972
971
.07
977
Legend
Elevation (m)
Elevation (m)
979
10
20
30
40
50
60
971
70
10
20
30
Station (m)
River = Guadalajara Reach = Principal
.07
977
BR Puente carrera 9
50
60
70
RS = 67.5
BR Puente carrera 9
.07
WS 50
977
WS 50
WS 5
Ground
Bank Sta
972
Legend
WS 100
WS 10
973
.07
978
WS 25
974
.07
WS 100
Elevation (m)
975
.
0
7
979
Legend
976
Elevation (m)
40
Station (m)
RS = 67.5
971
RS = 68 Seccin 27 Folmes
WS 25
976
WS 10
975
WS 5
974
Ground
973
Levee
Bank Sta
972
0
10
20
30
40
Station (m)
50
60
70
971
20
40
60
Station (m)
80
100
RS = 67 Seccin 26 Folmes
979
.07
.07
.07
Legend
WS 100
974
WS 25
WS 10
975
WS 5
974
Ground
973
Levee
Elevation (m)
WS 50
976
20
40
60
80
WS 50
WS 25
973
WS 10
WS 5
972
Ground
Bank Sta
971
Bank Sta
972
970
100
10
20
Station (m)
50
60
70
.07
RS = 64 Secin 23 folmes
.07
.07
975
Legend
WS 100
.07
.07
Legend
WS 100
974
WS 25
WS 10
972
WS 5
Ground
WS 50
Elevation (m)
WS 50
973
Elevation (m)
40
RS = 65 Seccion 24 Folmes
30
Station (m)
973
WS 25
WS 10
972
WS 5
Ground
971
Levee
971
Bank Sta
970
.07
WS 100
977
Elevation (m)
.07
975
Legend
978
971
RS = 66 Seccin 25 Folmes
10
20
30
Station (m)
40
50
Levee
970
969
Bank Sta
10
20
30
40
Station (m)
50
60
70
RS = 63 Seccion 22 Folmes
973.5
.07
.07
.07
Legend
WS 100
973
WS 25
972.0
WS 10
971.5
WS 5
971.0
Ground
970.5
Levee
Elevation (m)
WS 50
10
20
30
40
50
60
WS 50
WS 25
972
WS 10
WS 5
971
Ground
Levee
970
Bank Sta
970.0
969
70
Bank Sta
10
20
30
Station (m)
974
40
50
60
Station (m)
RS = 61 Seccion 20 folmes
RS = 60 Seccion 19 Folmes
.07
973
Legend
.07
.07
Legend
WS 100
973
WS 100
972
972
WS 25
WS 10
971
WS 5
Ground
970
Elevation (m)
WS 50
Elevation (m)
.07
WS 100
972.5
Elevation (m)
.07
974
Legend
973.0
969.5
RS = 62 Seccion 21 Folmes
WS 50
WS 25
971
WS 10
WS 5
970
Ground
Levee
969
968
Bank Sta
10
20
30
40
Station (m)
50
60
70
Levee
969
968
Bank Sta
20
40
60
Station (m)
80
100
RS = 59 Seccion 18 Folmes
973
WS 100
WS 10
970
WS 5
Ground
969
Legend
WS 100
WS 50
971
Elevation (m)
Elevation (m)
WS 25
.07
972
WS 50
971
.07
973
Legend
972
WS 25
970
WS 10
WS 5
969
Ground
968
Bank Sta
968
967
Levee
Bank Sta
967
10
20
30
40
50
966
60
10
20
Station (m)
RS = 57 Seccin 16 Folmes
973
30
40
50
60
Station (m)
RS = 56 Seccion 15 Folmes
.07
.07
972
Legend
.07
.07
Legend
WS 100
972
WS 100
971
971
WS 25
WS 10
970
WS 5
Ground
969
Elevation (m)
WS 50
Elevation (m)
RS = 58 Seccion 17 Folmes
WS 50
WS 25
970
WS 10
WS 5
969
Ground
Levee
968
967
Bank Sta
10
20
30
Station (m)
40
50
Levee
968
967
Bank Sta
10
20
30
Station (m)
40
50
60
RS = 55 Seccion 14 Folmes
973
.07
WS 100
WS 10
970
WS 5
Ground
969
Legend
WS 100
WS 50
970
Elevation (m)
Elevation (m)
WS 25
.07
971
WS 50
971
.07
972
Legend
972
WS 25
969
WS 10
WS 5
968
Ground
967
Bank Sta
968
Bank Sta
966
967
-20
-10
10
20
30
40
965
50
10
20
Station (m)
River = Guadalajara Reach = Principal
.07
976
30
40
50
Station (m)
RS = 53.5
RS = 53.5
.07
976
Legend
.07
Legend
WS 100
974
WS 100
974
972
WS 25
WS 10
970
WS 5
Ground
968
Elevation (m)
WS 50
Elevation (m)
RS = 54 Seccin 13 Folmes
WS 50
WS 25
972
WS 10
WS 5
970
Ground
Bank Sta
966
964
Levee
968
10
20
30
Station (m)
40
50
966
-40
Bank Sta
-20
20
Station (m)
40
60
RS = 53 Seccion 12 Folmes
973
.07
WS 100
972
970
WS 10
WS 5
969
Ground
968
Bank Sta
-20
20
40
WS 100
WS 50
WS 25
970
WS 10
WS 5
969
Ground
968
Levee
967
Legend
971
Elevation (m)
Elevation (m)
WS 25
.07
972
WS 50
971
.07
973
Legend
966
-40
Levee
Bank Sta
967
966
60
20
40
Station (m)
RS = 51 Seccion 10 folmes
.07
.07
100
RS = 50 Seccion 9 Folmes
WS 50
970
WS 50
Ground
Bank Sta
966
Elevation (m)
WS 100
WS 5
967
Legend
971
WS 10
968
.07
WS 100
WS 25
969
.07
972
Legend
970
Elevation (m)
80
971
965
60
Station (m)
RS = 52 Seccion 11 Folmes
WS 25
969
WS 10
968
WS 5
967
Ground
966
Levee
Bank Sta
965
0
10
20
30
40
Station (m)
50
60
70
964
10
20
30
40
Station (m)
50
60
70
80
RS = 49 Seccion 8 Folmes
.07
.07
WS 100
967
WS 10
WS 5
966
Ground
965
Bank Sta
10
20
30
40
50
WS 100
WS 50
WS 25
966
WS 10
WS 5
965
Ground
964
Levee
964
Legend
967
Elevation (m)
Elevation (m)
WS 25
.07
968
WS 50
968
.07
969
Legend
969
963
Bank Sta
963
962
60
10
20
Station (m)
RS = 47 Seccion 6 Folmes
.07
50
RS = 46 Seccin 5 Folmes
WS 50
WS 25
966
WS 25
965
WS 10
964
WS 5
964
Ground
963
Bank Sta
Elevation (m)
WS 50
WS 5
962
WS 100
967
WS 10
965
Legend
968
WS 100
966
.07
969
Legend
967
Elevation (m)
40
968
961
30
Station (m)
969
RS = 48 Seccion 7 Folmes
Ground
963
Bank Sta
962
961
10
20
30
Station (m)
40
50
960
10
20
30
Station (m)
40
50
60
RS = 45 Seccin 4 Folmes
967
.07
WS 100
964
WS 10
WS 5
963
Ground
962
Legend
WS 100
WS 50
WS 25
964
WS 10
WS 5
963
Ground
962
Bank Sta
961
Bank Sta
961
10
20
30
40
960
50
20
40
Station (m)
RS = 43 Seccin 2 Folmes
80
.07
RS = 42 Seccin 1 folmes
.07
.07
965
Legend
WS 100
970
.07
.07
Legend
WS 100
964
WS 25
966
WS 10
WS 5
964
Ground
962
WS 50
Elevation (m)
WS 50
968
Elevation (m)
60
Station (m)
963
WS 25
WS 10
962
WS 5
Ground
961
Bank Sta
Bank Sta
960
960
958
.07
965
Elevation (m)
Elevation (m)
WS 25
.07
966
WS 50
965
.07
967
Legend
966
960
RS = 44 Seccin 3 Folmes
10
20
30
Station (m)
40
50
60
959
10
20
30
40
Station (m)
50
60
70
RS = 41.5
965
.07
.07
964
Legend
.
965 0
7
WS 100
964
963
WS 25
WS 10
962
WS 5
Ground
961
.07
Legend
WS 100
WS 50
WS 25
962
WS 10
WS 5
961
Ground
960
Bank Sta
960
Bank Sta
959
10
20
30
40
50
60
958
70
10
20
Station (m)
RS = 41 Seccin 41 Top:113
40
50
RS = 40 Seccin 40 Top:170
.07
.07
963
Legend
WS 100
964
.07
Legend
WS 100
962
WS 25
962
WS 10
WS 5
961
Ground
960
WS 50
Elevation (m)
WS 50
963
Elevation (m)
30
Station (m)
961
WS 25
WS 10
960
WS 5
Ground
959
Bank Sta
Bank Sta
958
959
958
963
Elevation (m)
Elevation (m)
WS 50
959
RS = 41.5
10
20
30
Station (m)
40
50
957
10
20
30
40
Station (m)
50
60
70
RS = 39 Seccin 39 Top:270
962
.07
.
960 0
7
Legend
.07
Legend
WS 100
961
WS 100
959
960
WS 25
WS 10
959
WS 5
Ground
958
Elevation (m)
WS 50
Elevation (m)
RS = 38 Seccin 38 Top:370
WS 50
WS 25
958
WS 10
WS 5
957
Ground
Levee
957
956
Bank Sta
956
Bank Sta
10
20
30
40
50
60
955
70
10
20
30
Station (m)
RS = 37 Seccin 37 Top:424
60
.07
RS = 36.5
.07
.07
966
Legend
WS 100
962
.07
Legend
WS 100
964
WS 50
WS 25
960
WS 10
WS 5
958
Ground
WS 50
Elevation (m)
Elevation (m)
50
Station (m)
River = Guadalajara Reach = Principal
40
962
WS 25
WS 10
960
WS 5
Ground
958
Bank Sta
956
954
Bank Sta
956
10
20
30
40
Station (m)
50
60
70
954
10
20
30
40
Station (m)
50
60
70
RS = 36.5
966
.07
.07
964
Legend
.07
Legend
WS 100
964
WS 100
962
962
WS 25
WS 10
960
WS 5
Ground
958
Elevation (m)
WS 50
Elevation (m)
RS = 36 Seccin 36 Top:435
WS 50
WS 25
960
WS 10
WS 5
958
Ground
Bank Sta
Bank Sta
956
956
954
10
20
30
40
50
60
954
70
10
20
30
Station (m)
RS = 35 Seccin 35 Top:470
.07
70
RS = 34 Seccin 34 Top:491
WS 50
958
WS 50
Ground
Bank Sta
954
Elevation (m)
WS 100
WS 5
955
Legend
959
WS 10
956
.07
WS 100
WS 25
957
.07
960
Legend
958
Elevation (m)
60
959
953
50
Station (m)
40
WS 25
957
WS 10
956
WS 5
955
Ground
954
Bank Sta
953
0
10
20
30
40
Station (m)
50
60
70
952
10
20
30
Station (m)
40
50
60
RS = 33.5
BR Puente Ferrocarril
.07
.07
960
Legend
.07
Legend
WS 100
959
WS 100
958
WS 50
958
WS 50
WS 25
957
WS 10
956
WS 5
955
Ground
954
Bank Sta
953
952
WS 25
957
WS 10
956
WS 5
955
Ground
954
Bank Sta
953
0
10
20
30
40
50
952
60
10
20
Station (m)
960
RS = 33 Seccin 33 Top:497
40
50
60
RS = 32 Seccin 32 Top:570
.07
958
WS 50
WS 25
957
WS 10
956
WS 5
955
Ground
954
Bank Sta
.07
Legend
WS 100
957
WS 50
Elevation (m)
WS 100
.07
958
Legend
959
956
WS 25
WS 10
955
WS 5
Ground
954
Bank Sta
953
953
952
30
Station (m)
Elevation (m)
BR Puente Ferrocarril
959
Elevation (m)
Elevation (m)
960
RS = 33.5
10
20
30
Station (m)
40
50
60
952
10
20
30
40
Station (m)
50
60
70
956
.07
WS 100
WS 10
WS 5
953
Ground
.
0
7
Legend
WS 100
WS 50
954
Elevation (m)
WS 25
.07
955
WS 50
954
.07
956
Legend
955
Elevation (m)
WS 25
953
WS 10
WS 5
952
Ground
951
Bank Sta
Bank Sta
952
950
951
20
40
60
949
80
20
40
Station (m)
RS = 29 Seccin 29 Top:870
100
.07
RS = 28 Seccin 28 Top:890
.07
.07
956
Legend
.07
.07
Legend
WS 100
953
WS 100
954
952
WS 25
WS 10
951
WS 5
Ground
950
Elevation (m)
WS 50
Elevation (m)
80
Station (m)
60
WS 50
WS 25
952
WS 10
WS 5
950
Ground
Bank Sta
949
948
Bank Sta
948
20
40
60
Station (m)
80
100
120
946
20
40
60
Station (m)
80
100
120
RS = 27 Seccin 27 Top:910
954
.07
WS 100
.07
.07
WS 10
WS 5
950
Ground
949
WS 100
WS 50
951
WS 25
WS 10
950
WS 5
Ground
949
Bank Sta
Bank Sta
948
948
20
40
60
80
947
100
10
20
30
Station (m)
40
50
60
70
Station (m)
RS = 25 Seccin 25 Top:950
RS = 24 Seccin 24 Top:960
WS 100
WS 10
950
WS 5
Ground
949
Bank Sta
948
Legend
WS 100
WS 50
951
Elevation (m)
WS 25
.
0
7
952
WS 50
951
.07
953
Legend
952
Elevation (m)
Legend
952
Elevation (m)
WS 25
951
947
.
0
7
WS 50
952
Elevation (m)
953
Legend
953
947
RS = 26 Seccin 26 Top:930
WS 25
950
WS 10
WS 5
949
Ground
948
Bank Sta
947
10
20
30
40
Station (m)
50
60
70
80
946
10
20
30
40
Station (m)
50
60
70
80
RS = 23 Seccin 23 Top:970
.
0
7
.07
954
Legend
.
0
7
Legend
952
WS 100
953
WS 100
951
WS 50
952
WS 50
WS 25
950
WS 10
949
WS 5
948
Ground
947
Bank Sta
Elevation (m)
Elevation (m)
953
RS = 22 Seccin 22 Top:980
946
945
WS 25
951
WS 10
950
WS 5
949
Ground
948
Bank Sta
947
0
10
20
30
40
50
60
946
70
10
20
30
Station (m)
50
60
70
80
Station (m)
River = Guadalajara Reach = Principal
RS = 21 Seccin 21 Top:990
RS = 20 Seccin 20 Top:1000
.07
956
40
.07
956
Legend
Legend
WS 100
WS 100
954
WS 50
WS 25
952
WS 10
WS 5
950
Ground
Elevation (m)
Elevation (m)
954
WS 50
WS 25
952
WS 10
WS 5
950
Ground
Bank Sta
948
946
Bank Sta
948
20
40
Station (m)
60
80
946
10
20
30
Station (m)
40
50
60
RS = 19
.07
956
RS = 19
.07
956
Legend
Legend
WS 100
WS 100
954
WS 50
WS 25
952
WS 10
WS 5
950
Ground
Elevation (m)
Elevation (m)
954
WS 50
WS 25
952
WS 10
WS 5
950
Ground
Bank Sta
Bank Sta
948
946
948
10
20
30
40
50
946
60
10
20
Station (m)
River = Guadalajara Reach = Principal
40
50
60
Station (m)
RS = 17
.07
954
30
.07
956
Legend
Legend
WS 100
Elevation (m)
WS 25
WS 10
950
WS 5
Ground
Elevation (m)
WS 50
952
WS 50
WS 25
952
WS 10
WS 5
950
Ground
Bank Sta
948
946
WS 100
954
Bank Sta
948
10
20
30
Station (m)
40
50
60
946
10
20
30
Station (m)
40
50
60
RS = 17
956
RS = 16 Seccin 16 Top:1024.5
WS 100
954
.07
956
Legend
Legend
WS 100
954
952
WS 25
WS 10
950
WS 5
Ground
948
WS 50
Elevation (m)
Elevation (m)
WS 50
952
WS 25
WS 10
950
WS 5
Ground
948
Bank Sta
Bank Sta
946
944
946
10
20
30
40
944
50
10
20
Station (m)
River = Guadalajara Reach = Principal
.07
WS 100
951
WS 50
WS 25
950
WS 10
949
WS 5
948
Ground
947
Bank Sta
.07
952
Legend
RS = 14 Seccin 14 Top:1044.5
.07
Legend
WS 100
951
WS 50
Elevation (m)
Elevation (m)
50
952
950
WS 25
WS 10
949
WS 5
Ground
948
Bank Sta
947
946
945
40
Station (m)
RS = 15 Seccin 15 Top:1034.5
30
10
20
30
40
Station (m)
50
60
70
80
946
10
20
30
40
Station (m)
50
60
70
RS = 13 Seccin 13 Top:1054.5
952
RS = 12 Seccin 12 Top:1064.5
.07
WS 100
951
.07
952
Legend
.07
Legend
WS 100
951
950
WS 25
WS 10
949
WS 5
Ground
948
WS 50
Elevation (m)
Elevation (m)
WS 50
950
WS 25
WS 10
949
WS 5
Ground
948
Bank Sta
Bank Sta
947
946
947
10
20
30
40
50
946
60
10
20
Station (m)
River = Guadalajara Reach = Principal
.07
.07
WS 100
60
RS = 10 Seccin 10 Top:1084.5
WS 10
WS 5
948
Ground
947
Bank Sta
946
.07
Legend
WS 100
WS 50
950
Elevation (m)
949
.07
951
WS 50
WS 25
.07
952
Legend
950
Elevation (m)
50
951
945
40
Station (m)
RS = 11 Seccin 11 Top:1074.5
30
WS 25
949
WS 10
WS 5
948
Ground
947
Bank Sta
946
10
20
30
40
Station (m)
50
60
70
945
10
20
30
40
Station (m)
50
60
70
RS = 9 Seccin 9 Top:
952
.07
WS 100
Legend
WS 100
950
WS 25
949
WS 10
WS 5
948
Ground
947
WS 50
Elevation (m)
WS 50
950
Elevation (m)
.07
951
Legend
951
949
WS 25
WS 10
948
WS 5
Ground
947
Bank Sta
Bank Sta
946
946
945
20
40
60
945
80
20
40
Station (m)
River = Guadalajara Reach = Principal
RS = 7 Seccin 7 Top:1144.5
80
100
RS = 6 Seccin 6 Top:1164.5
.07
951
60
Station (m)
950
Legend
.07
Legend
WS 100
950
WS 100
949
949
WS 25
WS 10
948
WS 5
Ground
947
Elevation (m)
WS 50
Elevation (m)
RS = 8 Seccin 8 Top:
WS 50
WS 25
948
WS 10
WS 5
947
Ground
Bank Sta
946
945
Bank Sta
946
20
40
60
Station (m)
80
100
945
20
40
60
Station (m)
80
100
RS = 5 Seccin 5 Top:1264.5
949
.07
949
Legend
WS 100
948
.07
Legend
WS 100
948
WS 50
WS 25
947
WS 10
WS 5
946
Ground
WS 50
Elevation (m)
Elevation (m)
RS = 4 Seccin 4 Top:1364.5
947
WS 25
WS 10
946
WS 5
Ground
945
Bank Sta
Bank Sta
945
944
944
20
40
60
80
100
120
943
140
20
40
Station (m)
River = Guadalajara Reach = Principal
80
100
Station (m)
RS = 3 Seccin 3 Top:1464.5
RS = 2 Seccin 2 Top:1564.5
.07
947
60
.
947 0
7
Legend
WS 100
946
.07
Legend
WS 100
946
945
WS 25
WS 10
944
WS 5
Ground
943
WS 50
Elevation (m)
Elevation (m)
WS 50
945
WS 25
WS 10
944
WS 5
Ground
943
Bank Sta
942
941
Bank Sta
942
20
40
60
Station (m)
80
100
941
20
40
60
Station (m)
80
100
RS = 1 Seccin 1 Top:1664.5
946
.07
Legend
WS 100
945
Elevation (m)
WS 50
944
WS 25
WS 10
943
WS 5
Ground
942
Bank Sta
941
940
20
40
60
Station (m)
80
100
MUNICIPIO DE BUGA
ESTUDIOS DE PREINVERSIN Y DIAGNSTICOS SOBRE
LOS PUENTES DEL RO GUADALAJARA EN EL TRAMO
PUENTE EL DERRUMBADO Y PUENTE LA MERCED
ESPECIFICACIONES TECNICAS
ALCANCE
Las obras aqu especificadas comprenden el suministro de toda la mano de
obra, equipo, materiales y la ejecucin de todos los trabajos necesarios para
llevar a cabo la obras de control de inundaciones y estabilizacin de cauce
del ro Guadalajara en el rea urbana del municipio de Buga.
GENERALIDADES
Objeto, normas y procedimientos. Las presentes especificaciones tcnicas
tienen como finalidad establecer una gua de procedimientos para llevar a
cabo los diferentes trabajos requeridos en la construccin de las obras
definidas en el alcance de las presentes especificaciones.
Las especificaciones y planos que se entreguen al Contratista se
complementan entre s y tienen por objeto explicar las condiciones y
caractersticas constructivas relacionadas con el empleo de los materiales
como figura en los planos.
Cualquier detalle que se haya omitido en las especificaciones, en los planos,
o en ambos, pero que debe formar parte de la construccin, no exime al
Contratista de su ejecucin ni podr tomarse como base para reclamaciones
o demandas posteriores.
El proponente favorecido deber ceirse a los mtodos, normas,
procedimientos y compromisos que aqu se describen y si de acuerdo con su
criterio cree conveniente cambiar o modificar algo en cualesquiera de los
temes de acuerdo a lo aqu establecido, no podr hacerlo sin previa consulta
y sin autorizacin escrita del municipio de Buga, la Interventora o de
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
ii
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
iii
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
iv
Campamento
1.2
LOCALIZACION Y REPLANTEO
Global
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
Medida y pago:
1.3
Generalidades
El manejo de cauces y aguas durante la construccin implica el manejo de
todas las aguas, tanto subterrneas como superficiales durante la ejecucin
de las obras contratadas. Para las obras que deban ejecutarse en seco,
correr por cuenta del contratista el manejo de todas esta agua y comprende
el suministro y aplicacin de todos los medios, materiales, organizacin,
mano de obra y equipos, necesarios para mantener libres de agua las obras
de ejecucin que as lo requieran.
El Contratista deber ejecutar las obras provisionales y trabajos que sean
necesarios para manejar el ro, desaguar y proteger contra inundaciones
superficiales e infiltraciones subterrneas las zonas de construccin, y dems
sitios, donde la presencia de aguas afecta la calidad o el rendimiento de la
construccin, an cuando ellas no estuvieran indicadas en los planos ni
hubieran sido determinadas por el Interventor.
Los trabajos y obras provisionales a que se refiere esta especificacin,
servirn para desviar, contener, evacuar y/o bombear las aguas, de modo tal
que no interfieran con el adelanto de las obras por construir, ni con su
ejecucin y conservacin adecuadas. El Contratista deber mantener
continuamente estas condiciones de trabajo durante el tiempo que sea
necesario a juicio del Interventor.
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
vi
El Contratista deber efectuar todos los trabajos necesarios para remover las
obras de control de aguas o anular su efecto cuando ya no se requieran o el
Interventor lo ordene, en general, deber adelantar los trabajos que sean
necesarios para que las zonas afectadas por las obras de control queden en
el estado ms conveniente de acuerdo con los fines que persigue el
proyecto.
Medida y pago:
Global
2.
Generalidades
Este trabajo consiste en el suministro de toda la planta, ingeniera, materiales
equipo, mano de obra y transporte, incluyendo combustible, lubricantes,
energa y agua, y en la realizacin de todo trabajo requerido para
desenmalezar y limpiar en estricta concordancia con las especificaciones, los
planos de construccin, los dibujos, los planos de detalles suministrados por
el interventor y/o con las indicaciones de ste; aquellas zonas del proyecto
donde sea necesario conformar diques, construir obras de estabilizacin
del ro, previa autorizacin del Interventor.
Se deber as mismo restituir el paisaje alterado con las obras mediante unas
medidas de compensacin que consistirn en plantar rboles con cantidad y
especificacin que se detalla en el plan de manejo ambiental anexo, y
realizar la empradizacin de la zona verde existente, donde ella sufra
alteraciones como consecuencia de los trabajos realizados, donde lo
disponga el Interventor.
Ejecucin
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
vii
Toda el rea especificada para este fin, mostrada en los planos, y/o indicada
por el Interventor, debe estar completamente desarraigada por la remocin
de todas las cepas, races, troncos enterrados y otros materiales que puedan
ser objetables en trabajo terminado.
Todas las races y otras salientes mayores de cinco (5) centmetros de
dimetro que estn dentro del rea indicada por el Interventor, debern
quitarse hasta una profundidad no menor de un (1) metro por debajo de la
superficie previamente desenmalezada. Ningn rbol podr ser derribado o
mutilado sin necesidad absoluta y sin previa autorizacin de la autoridad
competente y del Interventor.
El Contratista se encargar de la disposicin de las caas, cepas, troncos,
pastos, ramas, races y desperdicios; el Contratista puede si lo desea,
conducirlos a sitios fuera de la zona de las obras, aprobadas por el
Interventor. Se considerarn como arbustos aquellos que posean troncos con
un dimetro hasta de 10 cm, por encima de esta medida se considerarn
como rboles.
Medida y forma de pago
La obra se medir por el nmero de arbustos y rboles cortados. No se
incluirn en la medida las reas desmontadas, limpiadas, descapotadas y
restauradas con reposicin de rboles y empradizacin en las zonas de
prstamo, para fuentes de materiales, ni aquellas que el Contratista haya
despejado por conveniencia propia, tales como caminos de acarreo,
campamentos, instalacin o depsitos de materiales.
El pago se realizar por arbusto y rbol cortado, el cual cubrir los costos
relacionados con la correcta ejecucin de los trabajos especificados.
Item de pago
2.1
2.2
2.2
Unidad.
Unidad.
HIDROINGENIERIA LTDA
viii
Medida y Pago:
El csped se medir por metro cuadrado instalado ( m ) , colocado con
aprobacin del INTERVENTOR.
El precio por metro cuadrado deber incluir los costos de suministro,
transporte, nivelacin, siembra y riego.
Item de pago
2.3
3.
metro cuadrado
DESCAPOTE
Descripcin
El trabajo a que se refiere esta seccin consiste en la ejecucin de las
operaciones necesarias para el descapote o remocin del suelo orgnico en
las reas en donde se construirn las obras de estabilizacin del ro. En
general todo este trabajo deber hacerse en las zonas que se indican en los
planos respectivos o como el Interventor lo ordene.
General
El descapote se har en las respectivas reas con una profundidad mnima
de 10 cm. o a la profundidad que indique el Interventor para remover toda la
capa superficial que contenga humus, hierba, races, etc. El Contratista debe
descapotar adems cualquier zona adicional que el Interventor indique. El
Descapote debe iniciarse despus que se hayan inspeccionado y aprobado
las reas de trabajo.
Si en lugar de descapote se requiere realizar un cajeo, a partir de los 20 cm
se medir y pagar la actividad en el tem 5.1 o 5.2, dependiendo si es
manual o a mquina.
Medida y forma de pago
La excavacin del descapote para todos estos trabajos se medir en M, se
basar en levantamientos topogrficos del terreno hechos antes y despus
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
ix
metro cbico.
5.
Generalidades
Esta actividad comprende la rotura y extraccin de materiales para la
ejecucin de fundaciones, cajeos y en general toda clase de excavacin
necesaria para la construccin de las obras.
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xi
metro cbico
metro cbico
metro cbico
metro cbico
6. TERRAPLEN
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xii
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xiii
est tan lisa que puede no adherirse adecuadamente con la capa superior,
deber ser escarificada antes de que dicha capa se coloque encima de ella.
Control de humedad. El Contratista deber distribuir suficientemente agua
en cada capa antes de cilindrar para obtener la humedad adecuada, para
lograr una compactacin del 85% del ensayo Proctor Standard.
Operaciones de cilindrada. Cada capa deber ser compactada con no
menos de 4 pasos de un rodillo apisonador que cumpla los requisitos que se
dan a continuacin: No se deben usar en tandas de ms de 2 rodillos y si
esto ocurre cada viaje del cilindro sobre cualquier superficie ser considerado
como 2 pasos. Cada paso del cilindro apisonador debe cubrir el paso
precedente o adyacente por lo menos 30 cm. Las porciones de terrapln que
por cualquier razn no sean accesibles al rodillo, deben ser compactadas por
cualquier otro mtodo aceptado, a la misma compactacin del terrapln
circundante. Si en la opinin del Interventor no se ha llegado a la
compactacin deseada en cualquier rea del terrapln, usando el nmero
especificado de pasos, el Contratista deber efectuar pasos adicionales
hasta obtener la compactacin deseada.
Equipo. Los rodillos apisonadores sern de una o ms unidades, cada una
de las cuales consistir en un tambor cilndrico de una longitud no inferior a
1.20 metros. Cada cilindro debe ejercer una presin en el pi de por lo
menos 250 libras por pulgada cuadrada, una vez lastrado. La presin en el
pi se define como el peso total del cilindro y lastre dividido por el rea total
de los pies apisonadores que se hallen en una fila paralela al eje del rodillo.
Cada tambor debe tener los pies espaciados o escalonados uniformemente
sobre toda la superficie cilndrica de manera que resulten aproximadamente
tres pies apisonadores por cada dos pies cuadrados de superficie de tambor.
Los pies apisonadores deben sobresalir de la superficie cilndrica entre 18 y
25 cm. y deben tener una superficie no menor de 32 ni mayor de 45 cm
cuadrados. Las unidades deben ser equipadas con un dispositivo adecuado
para limpiar los pies. Las unidades cilindradoras de tipo mltiple deben poder
girar en el marco principal de manera que puedan adaptarse a superficies
irregulares del terreno y rotar individualmente. El rodillo debe ser manejado
por un tractor de tipo de oruga de suficiente potencia para que el cilindro viaje
a una velocidad aproximada de 3 km/h. El equipo adicional miscelneo, tal
como el equipo roceador, el escarificador y el esparcidor, debe ser de un tipo
aprobado, adecuado para la construccin del terrapln.
Acabado. El terrapln terminado debe llevarse a la seccin prescrita en
todos los puntos. La superficie del coronamiento debe quedar libre de huecos
o eminencias que dificulten el trnsito de vehculos.
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xiv
HIDROINGENIERIA LTDA
xv
dicha lnea. Los taludes debern ser afinados de tal manera que formen
superficies planas libres de ondulaciones excesivas. Se consideran como
excesivas las ondulaciones en que la distancia entre protuberancias sea
mayor de 2 metros y la profundidad mayor de 10 centmetros.
Medida y pago
Medida. A menos que se especifique de otra manera, los materiales para el
terrapln de cualquier descripcin, especificados en esta seccin, sern
medidos para el pago por el volmen determinado por el mtodo del
promedio de las reas extremas. La base para las medidas, sern secciones
de las reas por llenar tomadas inmediatamente antes de las operaciones de
relleno, y las secciones tericas de acuerdo con las rasantes, taludes y
dimensiones mostradas en los dibujos, con cualquier modificacin de ellas,
ordenadas por el Interventor, o aqu especificadas, con las siguientes
limitaciones: 1- No se har medida por el material adicional resultante de la
tolerancia de rasante y de taludes laterales. 2- Tampoco se mide para el
pago la tolerancia por encogimiento. 3- Los volmenes ocupados por
estructuras no sern incluidos en la medida para el pago del terrapln.
Los ensayos de laboratorio y/o de campo requeridos para comprobacin de
las especificaciones de compactacin de los terraplenes no tienen tem de
pago, su costo se incluye en el tem para terrapln semi-compactado
Pago. El precio por metro cbico para relleno semi-compactado incluye el
costo de suministrar toda la planta, equipos, mano de obra y operaciones
inherentes a la colocacin del relleno. No se reconocer pago alguno por
material colocado para tener en cuenta las tolerancias de rasante y de talud
laterales de encogimiento.
Item de pago
Descripcin
Terrapln semi - compactado
7.
Unidad de medida
m3
Descripcin
El relleno de las excavaciones realizadas para la construccin de los muros
de estabilizacin, consistir en todo el relleno requerido entre el muro de
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xvi
regarse
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xvii
metro cbico
7.2
metro cbico
7.3
metro cbico
8.
ESTRUCTURAS EN CONCRETO
Descripcin
Esta especificacin se refiere a la forma como debern ser construidas las
obras de fijacin de orilla y fondo, compuestas bsicamente por muros de
concreto reforzado. Se definen aqu los materiales, equipos y elementos
varios as como la colocacin de formaletas, preparacin y vaciado de
mezclas, acabado y curado del concreto y, en general, todas las operaciones
requeridas para terminar tales obras de acuerdo con los planos, las
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xviii
Cemento
El cemento empleado en las obras del proyecto ser portland, tipo 1 y debe
cumplir con las Normas Icontec Nmeros 30, 121, 321 la C150 de la ASTM
para el Tipo 1.
Si el Contratista almacena cemento deber protegerlo contra la humedad y
llevar un registro detallado del perodo de almacenamiento de cada lote.
Ser prohibido usar en las obras cemento que haya estado almacenado
durante ms de un mes o en el que se haya iniciado el proceso de fraguado.
Agregados
Los agregados para el concreto deben cumplir con la Norma Icontec 174; se
almacenarn sobre plataformas de madera u otra superficie dura y limpia.
Cuando se almacenen en pilas que estn en contacto con el suelo no se
podrn utilizar los primeros 15 centmetros de material. Los distintos tipos y
tamaos de agregado fino y grueso, se debern almacenar en montones
separados, lo suficientemente alejados para evitar que los materiales se
mezclen. La forma de almacenamiento no deber permitir la segregacin ni
la inclusin de materiales extraos a los agregados.
Agregado Fino
El agregado fino ser arena natural, lavada u otro material similar que cumpla
con los requisitos aqu anotados; se compondr de granos duros y estar
libre de polvo, esquistos, limos, alcalis, cidos y materias orgnicas o nocivas
Tamz No.
3/8"
4
8
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xix
16
30
50
100
200
Modulo de Finura
b.
50 - 85
25 - 60
10 - 30
2 - 10
- 5
2.3 - 3.1
Agregado Grueso
El agregado grueso ser material ptreo triturado y/o clasificado que cumpla
con los requisitos aqu anotados; se compondr de partculas duras y limpias
y estar libre de materias orgnicas o nocivas.
Los tipos o tamaos mximos admisibles del agregado grueso sern de 2"
los determinados por el Interventor, con base en las dimensiones de las
estructuras proyectadas y/o la disposicin del acero de refuerzo
Aditivos
El CONTRATISTA podr usar, previa autorizacin del Interventor, aditivos
que varen las caractersticas de la mezcla, del fraguado o el concreto
terminado; para esto deber presentar al Interventor con suficiente antelacin
a su uso, muestras de los aditivos propuestos asi como las especificaciones
del fabricante. En elementos de concreto reforzado, no ser permitido el uso
de aditivos que contengan cloruro de calcio u otras sustancias corrosivas.
Agua
El agua que se use para concreto, mortero y lechada, asi como durante el
perodo de curado, deber ser limpia, libre de cantidades perjudiciales de
aceite, cidos, sales, lcalis, limo, materia orgnica y otras impurezas. Si el
Interventor lo juzga convenientemente el Contratista deber presentar
anlisis qumicos del agua que proponga utilizar.
Mezclas y clases de concreto
El concreto se compondr de una mezcla de cemento Portland, agua y
agregados ptreos finos y gruesos. Se clasificar por su resistencia mnima
a la compresin para los fines del pago.
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xx
Equipo
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xxi
HIDROINGENIERIA LTDA
xxii
Mezcla
Por peso
Por peso
Por volumen o por peso
HIDROINGENIERIA LTDA
xxiii
Vibracin
Curacin
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xxiv
Acabado y Reparaciones
HIDROINGENIERIA LTDA
xxv
Itemes de pago
8.1.1 Solado espesor 0.07m 3000 psi
8.1.2 Concreto en zapatas, incluye formaleta 3500 psi
8.1.3 Concreto en pantallas, incluye formaleta 3500 psi
8.2
metro cuadrado
metro cbico
metro cbico
ACERO DE REFUERZO
Caractersticas:
El trabajo a que se refiere esta especificacin consiste en el suministro del
acero y la ejecucin de las operaciones de corte, doblado, amarrado y
colocacin de las varillas de refuerzo en los elementos estructurales de
concreto. El material que se utilice ser de barras de acero al carbono para
concreto reforzado de alta resistencia.
La norma que deben cumplir las barras de acero al carbono es la siguiente:
Lmite de Fluencia:
Resistencia
Alta
Alta
Alta
Dimetro
3/8 "
1/2 "
5/8
Mnimo
4200 kg/cm
4200 kg/cm
4200 kg/cm
Normas Icontec/grado
248
AH63
248
AH63
248
AH63
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xxvi
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xxvii
0.5 cm
Recubrimiento superior a 5 cm
1.0 cm
2.5 cm
MUNICIPIO DE BUGA
HIDROINGENIERIA LTDA
xxviii
Dimetro
9.5 mm
12.7 mm
15.9 mm
Peso (Kg/m)
0.56
1.00
1.50
MUNICIPIO DE BUGA
Kg