b. Info record
T code: ME11
Create an info record for the subcontract material (Header material)
with info type Sub contracting.
http://SAPERPHELP.blogspot.com
Page 1
c. Source List
T code: ME01
Create a source list for subcontract material with the info record
created in the previous step. Keep the MRP relevant indicator as 1 to
consider this source to planning run (MRP).
http://SAPERPHELP.blogspot.com
Page 2
to save
http://SAPERPHELP.blogspot.com
Page 3
After MRP run is done go to the T Code: MD04 (Stock requirement list) to
check the purchase requisition.
Select
http://SAPERPHELP.blogspot.com
Page 4
Click on
Page 5
Click
http://SAPERPHELP.blogspot.com
Page 6
System display current stock of 251 from the component material and
requirement of 200 for the vender.
http://SAPERPHELP.blogspot.com
Page 7
To issue the components to subcontract vender tick and select the material
and click on
Click
to confirm.
to
200 quantity from the component material will be shown as Stock provided
to vender as shown below.
http://SAPERPHELP.blogspot.com
Page 8
Go to quantity Tab and enter the receipt quantity as 40. Change the
component quantity as 80.
Tick the
check for errors and click
http://SAPERPHELP.blogspot.com
to
MOV 101 has happen for header material (Finished product received from
subcontractor) and MOV 543 has happen automatically for the component
material.
40 qty from finish product material has come to the stock in MMBE stock
report as shown bellow
80 qty from the component material stock provided to vender has been
reduced in the stock report for the component material.
http://SAPERPHELP.blogspot.com
Page 10