Sunteți pe pagina 1din 4

07/05/2016

CouncilOfArchitecture

ScaleOfCharges
LastUpdatedOn:21/10/2015

TypeofProject/Services

ScopeofWork&Services

Minimum
fees/Reimbursable
expenses

1.SingleBlockHousing

1.
ComprehensiveArchitectural
Services

Asdescribedfor
Comprehensive
ArchitecturalServicesinthe
Conditions
ofEngagementincludingSite
Developmentbutexcluding
Landscape
Architecture,Interior
Architecture,
GraphicDesignandSignage.

andsitesupto0.5
hectare:5Percenton
thecostofworks
assigned.
2.Forasitemorethan
0.5hectareandupto
2.5hectares:3.5
Percentonthecostof
worksassigned.
3.Forasitemorethan
2.5hectaresandupto
5hectares:2.5
Percentonthecostof
worksassigned.
4.Forasitemorethan5
hectares:2Percent
onthecostofworks
assigned.
5.IndividualHouse:7.5
Percentonthecostof
worksassigned.
Note:Thefeespayablein
marginalcasesinrespect
ofclauses(iii)to(v)shall
notbelessthanthe
maximumfeepayablein
theirrespectivepreceding
clauses.

1.2Allprojectsotherthan
housing

Asdescribedfor
Comprehensive
ArchitecturalServicesinthe
Conditions
ofEngagementincludingSite
Developmentbutexcluding
Landscape
Architecture,Interior

https://www.coa.gov.in/contprintcont.php?lid=86&lang=1&level=2&sublinkid=299

5Percentonthecostof
worksassigned.

1/5

07/05/2016

CouncilOfArchitecture

Architecture,
GraphicDesignandSignage.

1.2.1Repetitionof
thebuildinginthesame
campus

Asdescribedfor
Comprehensive
ArchitecturalServicesinthe
Conditions
ofEngagementincludingSite
Developmentbutexcluding
Landscape
Architecture,Interior
Architecture,
GraphicDesignandSignage.

5Percentonthecostof
worksassigned.

1.2.2Repetitionof
thebuildinginthe
samecampus

Asdescribedfor
Comprehensive
ArchitecturalServicesinthe
Conditions
ofEngagementexcept
Landscape
Architecture,Interior
Architecture,
GraphicDesign&Signage
andSite
Development.

2.5percentonthecostof
worksassigned

1.2.3Repetitionof
thebuildingata
differentsite

Asdescribedfor
Comprehensive
ArchitecturalServicesinthe
Conditions
ofEngagementexcept
Landscape
Architecture,Interior
Architecture,
GraphicDesign&Signage
andSite
Development.

3.5percentonthecostof
worksassigned.

1.3SiteDevelopment[except
1.1and1.2]

Asdescribedfor
Comprehensive
ArchitecturalServicesinthe
Conditions
ofEngagementexcept
Landscape
Architecture,Interior
Architecture,
GraphicDesignandSignage
[except
1.1and1.2].

2.5Percentonthecostof
worksassigned.

https://www.coa.gov.in/contprintcont.php?lid=86&lang=1&level=2&sublinkid=299

2/5

07/05/2016

1.4
ArchitecturalConservation/
Retrofitting/Additionsand
alterations

2.UrbanDesign

CouncilOfArchitecture

Asdescribedfor
Comprehensive
ArchitecturalServicesinthe
Conditions
ofEngagementexcept
Landscape
Architecture,Interior
Architecture,
GraphicDesignandSignage.

AsdescribedforUrban
Design/Urban
RenewalintheConditionsof
Engagement.

7.5Percentonthecostof
worksas

Forallprojectsexcept
Housing:1percenton
thecostofworks
assigned,tobe
computedatarateof
Rs6MperSq.mt.of
proposedbuiltup
area.
HousingProjects:20
percentofthefee
payableforhousing,
asstatedinsubclause
1.1above,onthecost
ofworksassigned,to
becomputedatarate
ofRs6MperSq.mt.of
proposedbuiltup
area.
IncaseofUrban
Renewalprojectsfee
payableshallbe1.5
timesofthefeestated
abovebasedonactual
costofworks
assigned.
Abovefeesaresubjecttoa
minimumofRupees240M.

3.
InteriorArchitecture/Graphic
designandsignage

AsdescribedforInterior
Architecturein
theConditionsof
Engagement.

7.5percentonthecostof
worksassigned

4.LandscapeArchitecture

AsdescribedforLandscape
Architecture
intheConditionsof
Engagement.

7.5percentonthecostof
worksassigned

Visitsbyan
Architect/consultant
https://www.coa.gov.in/contprintcont.php?lid=86&lang=1&level=2&sublinkid=299

3/5

07/05/2016

CouncilOfArchitecture

inconnectionwithProject
forwhichcommissioned.
OutstationVisit:
5.Sitevisits

Traveling,Boarding&
LodgingExpenses

ActualAir/ACFirstClass
Fare(to&fro),ACCar,
Boarding&Lodging
ExpensesandLocal
Transport.

Rs.3M

Foreachday
Rs.1M
Localsitevisit/field
visit

Outstation
6.AdvisoryConsultancy
Local

Allasaboveat5i)(a)plus
Rs.10Mperdayorpart
thereof.
Rs.4Mperdayorpart
thereof.

7.Documentationand
CommunicationCharges

Applicableonall
professionalfee
payabletotheArchitect.

8.Verification
andCertification
ofContractor'sBills

VerificationofContractor's
billsfor
payment,basedonprogress
ofworks
atsite,measurementsof
worksCertified
bytheConstructionManager
1percentinadditionto
(i.e.ClerkofWorks/Site
abovefees.
Supervisor
orConstructionManagement
Agency)andinaccordance
with
ConditionsofContract,
Drawings
andinstructionissued.

10percentofthe
professionalfees.

ExplanatoryNotes:
ForworkscostinguptoRs.1400MtheprofessionalfeesmaybenegotiablebetweentheArchitect
andtheClient.
WhenanArchitectisengagedtoundertakeComprehensiveArchitecturalServicesinrespectof
buildings/SiteDevelopmentand/orLandscapeArchitecturalServicesasafollowupofanUrban
Design/UrbanRenewalScheme,hisprofessionalfeeforComprehensiveArchitecturalServices/
LandscapeArchitecturalServicesshallbereducedby20%.
ThecurrentvalueofMis1000.

https://www.coa.gov.in/contprintcont.php?lid=86&lang=1&level=2&sublinkid=299

4/5

S-ar putea să vă placă și