Documente Academic
Documente Profesional
Documente Cultură
Resource Efficiency
practices and Logistics
MRE Guide
Material Logistics Plans
Reverse Logistics
Malcolm Waddell
Construction Project Manager
Regeneration
Linking the demolition and new-build
stages to maximise resource
efficiency.
Current Projects
England
Moss Side, Manchester
Loam Pit Vale, Lewisham
Scotland
Bishopsbriggs, Glasgow
Raploch, Stirling
Clyde Gateway
Dumfries and Galloway
Ongoing Work
Major
Project Support
Material Logistics
Plans
Participating projects
Crossrail
Maidenhead London - Essex Kent
Farringdon
Station
Central London
Participating projects
Central St Giles
Central London
The Dartford
Hub
Dartford
Holborough
Near Maidstone
A cross section
Any location
City centre - urban - rural
Efficient construction
Reduced transport and associated CO2
Reduced productivity loss
Improved health & safety
Reduced damaged by:
Weather
Bad storage conditions
Unnecessary movements
Poor handling
Strategies
Just-in-time
On site logistics specialists
Construction consolidation centres
Off-site manufacture
4th party logistics
On-site marketplaces
IT solutions
Site
Site
CCC
Mixed loads from CCC
Daily deliveries - JIT
Logistics operator runs
the CCC
Transport to site
On site handling
Waste removed on
return journeys
Bulked up, compacted
etc at the CCC
Controlled manufacturing
environment
Standardisation
Consistent quality
Shorter time on site
Design freeze
Packaging
Transport and Travel
Reduced cost and risk
Implementation of MLP
Phase
2
Phase 1
Phase
3
Engage with
contractors
Pilot project
using WRAP
template
Monitor
performance
, SWMP data
Engage with
contractors
Internal
review
Build own
database of
KPIs
Adapt and
make part of
co
procedures
Programme
for co-wide
rollout
Continuous
review of
KPI and
procedures
Reverse Logistics
WAS620
The concept
Take-back schemes are becoming
more common offerings to UK
construction sites
There is a real opportunity here to:
Promote the take-back of unused / waste
product and packaging by delivery vehicles
Reduce vehicle movements and mileages
associated with material supply and waste
management
Reduce the environmental impact of
construction
Any questions?