Annexure 5.

Pavement Crust Details for New Construction / New Alignment

S. NO.

From (km)

To (Km)

Length, km

Design
CBR (%)

Design Traffic in
Stage I (Millions)
(N1)
(20182030)

Design Period
for Stage-I

Pavement Composition

(Stage-I)

BC

DBM

WMM

GSB

Estimated Bituminous
layer Thickness from
Estimated
IITPAVE software for Stage
Design Period Design Traffic
Design Traffic
2 Traffic
for Stage II
for 20 years for Stage II (n2)

Adopted pavement
composition at Stage II
(2026)

Bituminous layer

BC

DBM

Remarks

16.000

29.300

13.3

85

2018-2030

50

110

250

200

2030-2037

165

200

190

80

40

50

29.300

41.200

11.9

95

2018-2030

50

115

250

200

2030-2037

185

225

195

80

40

50

41.200

48.600

7.4

10

85

2018-2030

50

100

250

200

2030-2037

165

200

180

80

40

50

48.600

62.000

13.4

10

85

2018-2030

50

100

250

200

2030-2037

165

200

180

80

40

50

62.000

70.000

8.0

10

95

2018-2030

50

110

250

200

2030-2037

190

238

190

80

40

50

70.000

86.000

16.0

95

2018-2030

50

120

250

230

2030-2037

190

238

205

85

40

50

A - 65