0f Plumbing Systems
ASPE
Technical
Symposium
September
21,
2013
AIA / CES
Course Description
Learning Objectives
Overview of Session
1
t
r
Pa
Commissioning
101
Whe
re
Commissioning History
Commissioning
Timeline
1977
-
Public
Works
Canada
1988
-
ASHRAE
publishes
HVAC
Commissioning
Guideline
1993
-
NEBB
develops
certication
process
1994
-
LBNL
gathers
metrics
on
Cx
and
Operations
1996
-
ASHRAE
Guideline
1
-
1996
:
The
HVAC
Cx
Process
1998
-
BCA
born
and
USGBC
LEED
criteria
includes
Cx
2005
-
ASHRAE
Guideline
0
-
2005:
The
Cx
Process
Commissioning History
o
h
W
BECx
PFC
OPR
Cx
R
B
P
FPT
RCx
Alphabet Soup
D
O
B
CxA
Certications
Certications
Challenges
Ahead:
ANSI
Certied
P.E.
Requirement
Classications
General
Process
Cx
Specialists
Big
Brother
has
been
watching...
Why
Involvement
Commissioning
Authority
Engineer
Start
Contractor
Project
Timeline
How
Things
Are
Today.
End
Commissioning Benets
The Upside
w
o
H
One-Time
Process:
Commissioning
New
Construction
Retro-Commissioning
Existing
Building,
Never
Commissioned
Re-Commissioning
Existing
Building
that
has
been
Commissioned
Cyclical
Process:
Ongoing
Commissioning
Continuous
Commissioning
Sustainable
Commissioning***
Flavors of Commissioning
Systems A La Carte
Dierent
Guidelines:
ASHE
HFCx
GSA
more...
Systems A La Carte
GOALS
S
D
R
A
D
STAN
E
L
U
D
E
H
SC
Unpacking
the
OPR
T
N
I
A
M
E
C
N
ENA
Padiddle-a-WHAT?
Engineered Translation
Oce
Standards
Dedicated
Specications
Writer
Experience
With
Specied
Products
Key
Questions
Engineered
Translation
Wha
t
0.5
1.5%
of
the
overall
construction
cost
-
Building
Commissioning
Guide.
Version
2.2.
1998.
DOE/GSA.
2
-
4%
of
the
construction
cost
of
each
system
commissioned.
Whole
Building
Design
Guide
The
Reca
p
OPR
BOD
Commissioning
Value
End
of
Part
1
Questions?
Commissioning
101
2
t
r
Pa
Commissioning
Plumbing
Systems
The Process
Construction
Submittals
Commissioning Process
BOD
Project
Documents
Bonus Knowledge:
Extra Credit
Warning!
Design Phase
Construction
Phase
(Pre-Functional)
Construction
Phase
(Functional
Testing)
Occupancy Phase
High
Low
Opp
ortu
In nity
o
uen
f
ce
ge
n
a
h
C
f
o
t
Cos
SD
DD
CD
Design
Construction
Project Timeline
Design
Phase
The
Commissioning
Plan
Design
Reviews
Commissioning
Specications
Design
Reviews
First
Rule:
Not
A
Peer
Review!
Focus
On:
OPR
Compliance
Maintenance
Access
Coordination
Passing
Sni
Test
Think
Like
A
Contractor
Commissioning
Specications
General
Section
Contractor
Section
Construction
Phase
Submittal
Review
Pre-Functional
Checklists
Installation
Verication
Functional
Performance
Tests
Construction
Submittals
Review
Timing
Compliance
Options
Dimensions
Substitutions
Under
Construction
Pre-Functional
Checklists
Equipment
Verication
Installation
Operational
Testing
Under Construction
Occupancy
Phase
Training
Seasonal
Testing
Commissioning
Reports
/
Manuals
Warranty
Walk-Through
Training
Specied
Documented
Maintenance
Troubleshooting
Owning
The
Problems
During
Occupancy
Seasonal
Testing
Warranty
Walk-Through
Owning
The
Problems
Lets
Review...
Design
Commissioning
Plan
Design
Review(s)
Commissioning
Specications
Construction
Submittal
Reviews
Pre-Functional
Checklists
Installation
Verication
Functional
Test
Forms
Occupancy
Commissioning
Report
Systems
Manual
Seasonal
Testing
Warranty
Walk-Through
Deliverables
Design
BOD
Project
Documents
Design
Review
Comments
Construction
Submittals
PFC/FPT
Comments
Some
Meeting
Participation
Occupancy
How
it
works
Training
Session
Receivables
The
Syste
ms
System
Examples:
Domestic
Potable
Grey
Water
Reverse
Osmosis
Domestic
Water
Systems
Equipment
Examples:
Backow
Prevention
Devices
Pressure
Booster
Pumps
Solar
Hot
Water
Domestic
Water
Systems
System
Examples:
Drain,
Waste
&
Vent
Storm
Laboratory
Waste
Systems
Equipment
Examples:
Sewage
Grinders
Grease
Interceptors
Acid
Dilution
Tank
Waste
Systems
System
Examples:
Natural
Gas
Propane
Fuel
Oil
Fuel
Gas
Systems
Equipment
Examples:
Boilers
/
Water
Heaters
Kitchen
Equipment
Emergency
Generators
Fuel
Gas
Systems
System
Examples:
Steam
for
Hot
Water
Generation
Cleaning
Humidication
Steam
Systems
Equipment
Examples:
Steam
for
Heat
Exchangers
Autoclaves
Steam
Kettles
Steam
Systems
System
Examples:
Oxygen
Medical
Vacuum
Medical
Air
Medical
Gas
Systems
Equipment
Examples:
Zone
Alarms
Bulk
Storage
Tanks
Vacuums
Medical
Gas
Systems
System
Examples:
Compressed
Air
Special
Fluids
Pools
&
Fountains
Process
Systems
Equipment
Examples:
Air
Compressors
Special
Fluids
Pumps
Process Systems
System
Examples:
Wet-Pipe
Sprinkler
Double-Interlock
Chemical
Agents
Fire
Protection
Systems
Equipment
Examples:
Tamper
Switches
Fire
Pump
Deluge
Valve
Fire
Protection
Systems
The
Reca
p
Commissioning
is
a
Process
Save
Money
on
the
Front
End
Maintenance
Sta
Always
Wins
End
of
Part
2
Questions?
Commissioning
Plumbing
Systems
15 - Minute Break!
3
t
r
Pa
Feedback
From
The
Field
Coordinating Schedules
?
Its
not
on
MY
drawing!
Mechanical Drawing
Plumbing Drawing
Equipment Tagging
Brrrrrrrrr!!!!!
Devilish details
Flue Gases
It was a gas!
Material Headaches
Architect Relationships
My Arch Rival
Draining Problems
Im feeling drained
Sequences of Operations
Maintenance Access
Maintenance Access
Utility Coordination
For
Answers:
Matt
Nelson
ECO
Commissions
Call:
888-988-4ECO
(4326)
Email:
mnelson@ecocommissions.com
Podcast:
HVAC360
(HVAC360.com)