Documente Academic
Documente Profesional
Documente Cultură
ITEM
1.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
2.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
q.
DELIVERABLE
GENERAL
Documentation Schedule
Project Design Basis
Design Philosophies
Risk Management Plan
Assumptions Document
Opportunities Document
Issues Deferred to Detail Engineering
List of Long Delivery Items
Detail Design of Long Delivery Items
Request for Quotation Packages for Long Delivery Items
Minutes of meetings and Reviews
Semi Definitive Estimate
VIP Selection and Implementation
Updated Scope of Facilities
PROCESS ENGINEERING & SAFETY
Process Description
Process Flow Diagrams (PFDs)
Mass & Energy Balance Data
Equipment List
Equipment Process Data Sheets
Utility Consumption List
Catalyst and Chemicals Data
Plant Effluent & Emissions Data
Hazard Study Data
Mechanical Flow Diagrams (MFDs)
Utility Flow Diagrams (UFDs)
Concepts for Drainage and Layout of Sewers
Process Critical Line List
Special Piping Items Process Data Sheets
Special Design Information
Stack Data
Battery limit Schedule
REQ
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
u.
v.
Analytical Manual
w.
r.
s.
t.
x.
y.
z.
aa.
ab.
ac.
ad.
ae.
af.
ag.
3.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
q.
r.
Yes
Yes
Yes
Yes
Recomm
ended
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
s.
t.
u.
v.
w.
x.
y.
z.
aa.
ab.
4.
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.
5.
a.
b.
c.
d.
e.
f.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
g.
h.
i.
j.
k.
l.
m.
n.
o.
p.
q.
r.
s.
t.
u.
v.
w.
x.
y.
z.
aa.
ab.
ac.
6.
a.
b.
c.
d.
e.
f.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
h.
Yes
Yes
i.
Yes
Yes
g.
j.
B