Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
NDICE
Pg.
TTULO:......................................................................................................................................2
I.
INTRODUCCIN...............................................................................................................2
II.
OBJETIVOS:.......................................................................................................................3
III.
REVISIN LITERARIA:................................................................................................3
IV.
MATERIALES Y METODOS:........................................................................................6
V.
VI.
RESULTADOS:...................................................................................................................9
BIBLIOGRAFA:...........................................................................................................11
ANEXO:....................................................................................................................................12
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
INTRODUCCIN.
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
II.
OBJETIVOS:
III.
REVISIN LITERARIA:
3.1
PERMEABILIDAD:
Cuando se usa el trmino permeabilidad de un suelo, se est haciendo referencia
al grado de facilidad con que el agua pasa a travs del suelo. Es as entonces
cuando se habla de que un suelo es muy permeable en la medida en que haya
buena facilidad para que se mueva el agua a travs de su espacio poroso y que es
poco permeable, en el caso que se presente dificultad a ese movimiento. Cuando
se hacen estudios de los problemas de exceso de humedad en los suelos (drenaje)
es de gran importancia conocer y cuantificar el concepto de permeabilidad.
3.2
3.3
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
INFILTRACIN
Es el proceso por el cual el agua penetra desde la superficie del terreno hacia el
suelo. En una primera etapa satisface la deficiencia de humedad del suelo en una
zona cercana a la superficie, y posteriormente superado cierto nivel de humedad,
pasa a formar parte del agua subterrnea, saturando los espacios vacos.
3.5
VELOCIDADES DE INFILTRACION.
Muy arenosos
20-25 mm/h
Arenosos
15-20 mm/h
Limo-arenosos
10-15 mm/h
Limo-Arcillosos
8-10 mm/h
Arcillos
< 8 mm/h
INGENIERIA DE DRENAJE.
Valor de k (cm/s)
Superior a 10 -1
10 -1 a 10 -3
10 -3 a 10 -5
10 -5 a 10 -7
Menor de 10 -7
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
3.6
3.7
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
IV.
MATERIALES Y METODOS:
4.1.
MATERIALES:
METODOS:
Mtodo de Porchet: Para determinar infiltracin y permeabilidad del suelo
UBICACIN POLITICA:
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
DEPARTAMENTO
PROVINCIA
DISTRITO
: Ancash.
: Huaraz.
: Independencia.
COORDENADAS UTM:
Note: 223545.98 m N.
Este: 8946694.38 m E.
Altitud: 3203 m.s.n.m.
Se debe colocar dentro del pozo un flotador (en nuestro caso una esfera de
tecnopor) con un mecanismo que permita determinar el desplazamiento de este
como respuesta al movimiento del agua. Se llena el pozo de agua con un balde
de cuatro litros hasta alcanzar una profundidad de 30 Cm. Como se muestra en
las fotos:
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
MEDICIN DEL
DESCENSO DEL NIVEL
DE AGUA:
posteriormente se registra el
descenso del nivel de agua para cada intervalo de tiempo Comenzamos a medir
en tiempos de 0, 1, 2, , 10, 20, 30, 60y 120 y controlamos el aumento de
la altura referencial, hasta los 120 minutos. Como se muestra en las fotos:
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
V.
RESULTADOS:
Calculo de la Permeabilidad del suelo:
T (min)
1
2
5
10
15
20
25
30
40
50
60
70
80
90
T(min)Acu
m
1
3
8
18
33
53
78
108
148
198
258
328
408
498
Yi (mm)
Yf(mm)
32.5
32.5
32.5
32.5
32.5
32.5
32.5
32.5
32.5
32.5
32.5
32.5
32.5
32.5
33.74
34.99
35.9
37.2
38.02
38.72
39.98
40.04
41.3
41.8
43.5
43.9
44.3
44.55
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
100
110
120
Tiempo
inicio
tiempo
final
120
Ti =
Tf =
0.0000
0.0833
r=
598
708
828
32.5
32.5
32.5
Yinicio
32.5cm
Yfinal
45.8cm
dia
dia
Yi (cm) =
Yf(cm) =
10 cm =
0.1m
hf +r /2
r
log hi+ log
2
1.15r
K=
( )
K=
0.08958 m/dia
INGENIERIA DE DRENAJE.
44.8
45
45.8
0.0325
0.0458
m
m
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
a
=
n=
18
b=
-0.9092
1.9932
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
Mtodo grafico
2
1.5
1
Axis Title
0.5
0
0
0.5
1.5
-0.5
Axis Title
GRAFICAS
tiempo
ic
acumul
io
e=i0(cm/h
ado
(cm/hr)
ic
r)
(min)
1
98.43 24.03
74.4
67
67
36.25 13.54
3
49.8
32
68
14.86 10.63
8
25.5
09
91
7.109 8.557
18
15.7
4
3
4.097 5.939
33
10.0
2
2
53
7.0
2.663 4.378
INGENIERIA DE DRENAJE.
2.5
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
78
2
1.874
2
1.394
2
1.046
9
0.803
5
0.631
6
0.507
8
0.416
4
0.347
4
0.294
1
0.252
3
0.218
8
5.8
108
148
198
258
328
408
498
598
708
828
4.2
3.6
2.8
2.6
2.1
1.7
1.5
1.2
1.1
1.0
3
3.879
6
2.794
7
2.520
7
2.014
7
1.926
5
1.577
6
1.318
9
1.104
5
0.940
0
0.807
1
0.745
0
io vs ic
120.0
100.0
80.0
60.0
40.0
20.0
0.0
0
100
200
300
400
io (cm/hr)
INGENIERIA DE DRENAJE.
500
600
ic (cm/hr)
700
800
900
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
Tiempo
parcial
en min.
1
2
5
10
15
20
25
30
40
50
60
70
80
90
100
110
120
Tiempo
acumula
do en
min.
Lamina
infiltrad
a (cm)
1
3
8
18
33
53
78
108
148
198
258
328
408
498
598
708
828
1.24
1.25
0.91
1.3
0.82
0.7
1.26
0.06
1.26
0.5
1.7
0.4
0.4
0.25
0.25
0.2
0.8
Lamina
Vel.
Infil.
Vel.
Infil.
Acumul
ada
(cm/hr)
(cm/hr)
(cm)
Inst.
1.24
2.49
3.4
4.7
5.52
6.22
7.48
7.54
8.8
9.3
11
11.4
11.8
12.05
12.3
12.5
13.3
74.40
37.50
10.92
7.80
3.28
2.10
3.02
0.12
1.89
0.60
1.70
0.34
0.30
0.17
0.15
0.11
0.40
Promedi
o
74.40
49.80
25.50
15.67
10.04
7.04
5.75
4.19
3.57
2.82
2.56
2.09
1.74
1.45
1.23
1.06
0.96
X=
LogT
Y=
log(i)
X*Y
X^2
Y^2
0.0000
0.4771
0.9031
1.2553
1.5185
1.7243
1.8921
2.0334
2.1703
2.2967
2.4116
2.5159
2.6107
2.6972
0.0934
0.3962
0.5315
0.6721
0.7419
0.7938
0.8739
0.8774
0.9445
0.9685
1.0414
1.0569
1.0719
1.0810
0.0000
0.1890
0.4800
0.8437
1.1266
1.3687
1.6535
1.7841
2.0498
2.2243
2.5114
2.6590
2.7983
2.9157
0.0000
0.2276
0.8156
1.5757
2.3059
2.9731
3.5800
4.1348
4.7100
5.2747
5.8159
6.3296
6.8155
7.2750
0.0087
0.1570
0.2825
0.4517
0.5505
0.6301
0.7637
0.7698
0.8920
0.9380
1.0845
1.1170
1.1489
1.1685
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
598
708
828
12.30
12.50
13.30
total
2.7767
1.0899
3.0263
7.7101
1.1879
2.8500
1.0969
3.1262
8.1227
1.2032
2.9180
1.1239
3.2794
8.5149
1.2630
33.0509 14.4550 32.0361 76.1813 13.6171
MTODO GRAFICO
1.2
f(x) = 0.33x + 0.21
R = 0.98
0.8
Axis Title
0.6
0.4
0.2
0
0
0.5
1.5
Axis Title
INGENIERIA DE DRENAJE.
2.5
3.5
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
GRAFICAS
tiempo
acumula
do (min)
io (cm)
1
3
8
18
33
53
78
108
148
198
258
328
408
498
598
708
828
1.24
2.49
3.4
4.7
5.52
6.22
7.48
7.54
8.8
9.3
11
11.4
11.8
12.05
12.3
12.5
13.3
ic (cm)
1.6182
2.3250
3.2130
4.1983
5.1274
5.9947
6.8095
7.5811
8.4114
9.2589
10.1036
10.9361
11.7523
12.5510
13.3318
14.0954
14.8424
e=i0-ic
-0.3782
0.1650
0.1870
0.5017
0.3926
0.2253
0.6705
-0.0411
0.3886
0.0411
0.8964
0.4639
0.0477
-0.5010
-1.0318
-1.5954
-1.5424
io vs ic
20
15
10
5
0
0 100 200 300 400 500 600 700 800 900
io (cm)
ic (cm)
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
i=98.4367 t 0.9092
0.9092
i=98.4367(120)
i=1.267
Calculocm/hr
de la lmina infiltrada
I 1.6182t 0.3298
I 1.6182(120)0.3298
I 7.848 cm/hr
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
VI.
BIBLIOGRAFA:
Libros:
GRASSI, C. 1988. Fundamentos del Riego. Mrida. Serie Riego y Drenaje RD.,
Venezuela. 350 p.
JENSEN, M.E., BURMAN, R.D., y ALLEN, R.G. 1990. Evapotranspiration and
Irrigation Water Requirements. New York, Estados Unidos de Amrica, 360 p.
E. Bowles, Joseph.1982. Propiedades geofsicas de los suelos .Ediciones Lerner Ltda.
Editorial McGraw-Hill LATINOAMERICA, S.A. Impreso en Colombia. Captulo 8. Hidrulica de
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
ANEXO:
PANEL FOTOGRFICO:
SE OBSERVA LOS TRABAJOS DE PARA DETERMINAR LA PERMIABILIDAD Y LA
VELOCIDAD DE INFILTRACION DEL SUELO POR EL METODO DE PORCHET EN
EL CAMINO HACIA EL PINAR.
FOTO N01: Se observa a los integrantes del grupo en el lugar elegido para realizar
la prctica de infiltracin y permeabilidad por el mtodo de porchet.
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
FOTO N07, N08 y N09: Se observa la medicin y anotado de los datos del
descenso del nivel de agua, para cada intervalo de tiempo (registro del descenso del
nivel de agua para cada intervalo de tiempo, medido con un cronometro).
INGENIERIA DE DRENAJE.
UNIVERSIDAD NACIONAL
Trabajo N 01:
PRUEBA DE PERMEABILIDAD
MTODO DE PORCHET.
INGENIERIA DE DRENAJE.