PLAN OF
MFO I NATIONAL ROAD NETWORK SERVICES,
CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD, WIDENING OF
PERMANENT BRIDGES TO MORE THAN 2 LANES, CALIBUYO BRIDGE (B02901LZ)
ALONG NOVELETA - NAIC - TAGAYTAY ROAD
ROAD, ABUTMENT "A" :
BRIDGE
:
ROAD, ABUTMENT "B" :
= 93.00 L. M.
= 31.64 L. M.
= 54.36 L. M.
= 179.00 L. M.
= 3.05 M.
= 0.28 M.
PREPARED BY :
CHECKED BY :
RECOMMENDING APPROVAL:
ROMUALDO E. BERNARDO
NENETTE K. IGNA
JULIETA A. DESEO
ENGINEER V
CHIEF, PLANNING AND DESIGN DIVISION
DISTRICT ENGINEER
APPROVED BY:
TO MANILA
BACOOR
KA
THIS
SITE
IT
NOVELETA
CAVITE CITY
IO
R
SA
RO
IMUS
E -
CAVIT
BATAN
GAS R
OA
D
RIAS
.T
GEN
TANZA
TO NAIC
THIS
SITE
AN
TO NAIC
TO
DASMARIAS
BI
GMA
CARMONA
CE
TRE
GOVERNOR`S DRIVE
MA
TO
I
ES C
R
RTI
TA
YT
GA
TY
AY
SILANG
TO
YT
GA
TA
AY
D
TO IN
ANG
AMADEO
2
P1
VICINITY MAP
vit
a
,C
za
d,
y
ga
tay
a
Ro
n
Ta
Ta
ve
No
aic
N
a-
let
PROPOSED
WIDENING OF
CALIBUYO
BRIDGE
1
P1
KEY MAP
PROJECT / LOCATION
MFO I NATIONAL ROAD NETWORK SERVICES
CONSTRUCTION & MAINTENANCE OF BRIDGES
ALONG NATIONAL ROAD WIDENING OF PERMENENT
ROAD PERMENENT BRIDGES TO MORE THAN
2 LANES, CALIBUYO BRIDGE (B02901LZ) ALONG
NOVELETA-NAIC-TAGAYTAY ROAD
3
P1
SHEET CONTENTS :
PREPARED BY:
LOCATION PLAN
RECOMMENDING APPROVAL:
APPROVED:
SET NO.
SHT NO.
ROMUALDO E. BERNARDO
KEY MAP
VICINITY MAP
LOCATION PLAN
NENNETTE K. IGNA
ASSISTANT DISTRICT ENGINEER
JULIETA A. DESEO
CHECKED:
DATE:
ENGINEER V
DIRECTOR III
DISTRICT ENGINEER
DATE:
DATE:
3
OF 18
DRAWING INDEX
SHEET NO:
SHEET CONTENT
1/8
2/8
3/8
4/8
BRIDGE ELEV. (SECTION A-A), (SECTION B-B), COPING, BORED PILE, EXPANSION
DAM 1 & 2, RISER DETAILS, SPLICING DETAIL (B.PILE)
FOUNDATION PLAN, SIDEWALK-APPROACH , APPROACH , DIAPHRAGM DETAILS ,
SECTION F-F
5/8
6/8
7/8
8/8
2
P1
INDEX OF DRAWING
50
80
590
100
390
720
60
30
70 60
30 30
100 20 20
40
Sa daang matuwid,
kayo and panalo!
BILLBOARD
45
DEPARTMENT OF
PUBLIC WORKS AND HIGHWAYS
TEXT 2920 OR CALL (02) 165-02 FOR ANY CONCERN ON THIS PROJECT
www.dpwh.gov.ph
NOTE :
ALL DIMENSIONS ARE IN MILLIMETERS.
50 60 30 60 30
50
50
30
30
50
50
30
30
50
:
:
:
:
:
:
:
120
30
30
CONTRACTOR
DATE STARTED
CONTRACT COMPLETION DATE
CONTRACT COST
CONSTRUCTION CONSULTANT
IMPLEMENTING OFFICE
SOURCE OF FUND
50
30
50 70
90
EDGE OF ROAD
320
TRAFFIC DIRECTION
1350
1274
ROAD
DPWHSTANDARDPROJECTBILLBOARD
ORIENTATION
DISPLAY AREA
1200
1200
DISPLAY AREA
( 1200 x 2400 x 5 MARINE PLYWOOD )
50 x 50 HORIZONTAL COCOLUMBER
1000
1000
50 x 50 VERTICAL COCOLUMBER
50 x 50 WOODEN STAKE
50 x 50 WOODEN STAKE
500
1 SUMMARY QUANTITIES
P1
GROUND LEVEL
500
GROUND LEVEL
1000
2400
TYPICALFRAMEELEVATION
FRONTELEVATION (OPTION2)
DESIGNED BY :
3
P1
RONITO J. MERCADO
PROJECT BILLBOARD
CIVIL ENGINEER
PRC LIC.
PTR. NO.
ISSUED AT
ISSUED ON
:
:
:
:
0047518
2368148
BATANGAS CITY
FEBRUARY 2, 2015
PROJECT / LOCATION
MFO I NATIONAL ROAD NETWORK SERVICES
CONSTRUCTION & MAINTENANCE OF BRIDGES
ALONG NATIONAL ROAD WIDENING OF PERMENENT
ROAD PERMENENT BRIDGES TO MORE THAN
2 LANES, CALIBUYO BRIDGE (B02901LZ) ALONG
NOVELETA-NAIC-TAGAYTAY ROAD
SHEET CONTENTS :
PREPARED BY:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.
SHT NO.
ROMUALDO E. BERNARDO
BILL OF QUANTITIES
INDEX OF DRAWING
PROJECT BILLBOARD
NENNETTE K. IGNA
ASSISTANT DISTRICT ENGINEER
JULIETA A. DESEO
CHECKED:
DATE:
ENGINEER V
DIRECTOR III
DISTRICT ENGINEER
DATE:
DATE:
2
OF 18
2.1
2.1.2
2.1.3
DEAD LOADS
ITEMS
A. CONCRETE
B. STEEL
C. EARTH
D. ASPHALT OVERLAY
2.2
WEIGHT
24.00 kN/CU.M.
77.00 kN/CU.M.
19.00 kN/CU.M.
1.054 kN/SQ.M.
2.1.4
2.2
LIVE LOADS
2.2.1
IMPACT LOADS
2.2.2
MATERIALS
1.
PIN DIAMETER:
2.
4d OR
65 mm MIN.
10d OR
D
3.
CONCRETE
UNLESS INDICATED OTHERWISE ON PLANS. THE CONCRETE CLASS
STRENGTH SHALL BE AS FOLLOWS:
2.3
2.4
12 - 480mm
16 - 640mm
20 - 800mm
25 - 1000mm
2.4.2
28 - 1120mm
32 - 1300mm
36 - 1500mm
2.5
2.
135 HOOK
= 20mm
= 75mm
= 20mm
= 40mm
MAX. SIZE OF
AGGR. (mm)
1
2
3
4
19
19
19
19
28 DAYS
CYLINDER
STRENGTH
41.40 MPa
24.14 MPa
27.40 MPa
24.14 MPa
5.
2.
VERTICAL OFFSET
REMARKS
2.
REINFORCING STEEL
A.
B.
3.
PRESTRESSING STEEL
LAP SPLICE
2.6
C.
STRUCTURAL NOTES :
1.
2.
3.
4.
5.
6.
8.2
8.3
2.2.4
2.2.5
2.2.6
FORMWORK
MIN. TIME
28 DAYS
14 DAYS
7 DAYS
7 DAYS
2.7
REINFORCING STEEL
* GRADE 60: MINIMUM, Fy = 413.70 MPA (60 Ksi) (FOR ALL VERTICAL
BARS, 16 AND LARGER)
* GRADE 40: MINIMUM, Fy = 276.00 MPA (40 Ksi) (FOR ALL OTHERS,
12 AND SMALLER)
FALSEWORK
CONCRETE
THE MINIMUM 28 DAYS CYLINDER COMPRESSIVE STRENGTH ON
CONCRETE FOR PILES SHALL BE 27.6 MPA (4,000 Psi) WITH A
MAXIMUM SIZE OF COARSE AGGREGATES OF 20MM
7.
MATERIAL SPECIFICATIONS :
1.
8.1
B.
6.
MIN: d
MAX: d + 3mm
USE
8.
3.
CONCRETE STRENGTH
ITEM
0.25/RAD
0.00492RAD/M
4.
CONSTRUCTION JOINT
2.4.1
1.
STRUCTURES (ACI-315)
12.70 mm
98.7 sq. mm
183.7 kN
200 GPa
1862 MPa
1670 MPa
72% UTS
REFERENCES :
DESIGN PARAMETERS
90 HOOK
A.
(ACI-31B-95/99)
D = 6d FOR 10 THRU 25
D = 8d FOR 28 THRU 32
D = 10d FOR 36 AND LARGER
180 HOOK
LOADING
2.1
90 HOOK
BRIDGES (1997)
2.
4d OR
65 mm MIN.
1.2
12d
REINFORCED CONCRETE
DESIGN SPECIFICATIONS
1.1
1.
2.
1.
SETTING OUT
THE SETTING OUT AND THE ELEVATIONS OF THE DIFFERENT
COMPONENTS OF THE STRUCTURE SHALL BE APPROVED BY THE
ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION WORK.
DESIGN CRITERIA
2.
1.
NOTES ON PRESTRESSING
IN
10
1.
CONSTRUCTION
GENERAL
9.
10.
11.
7 DAYS
CAMBERING
USE 100 MM OR 4" CAMBER WHEN THE FORMWORKS OF THE
GIRDER ARE CONSTRUCTED
DESIGNED BY :
RONITO J. MERCADO
CIVIL ENGINEER
PRC LIC.
PTR. NO.
ISSUED AT
ISSUED ON
:
:
:
:
0047518
2368148
BATANGAS CITY
FEBRUARY 2, 2015
PROJECT / LOCATION
MFO I NATIONAL ROAD NETWORK SERVICES
CONSTRUCTION & MAINTENANCE OF BRIDGES
ALONG NATIONAL ROAD WIDENING OF PERMENENT
ROAD PERMENENT BRIDGES TO MORE THAN
2 LANES, CALIBUYO BRIDGE (B02901LZ) ALONG
NOVELETA-NAIC-TAGAYTAY ROAD
SHEET CONTENTS :
PREPARED BY:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.
SHT NO.
ROMUALDO E. BERNARDO
CHIEF, PLANNING AND DESIGN SECTION
NENNETTE K. IGNA
ASSISTANT DISTRICT ENGINEER
JULIETA A. DESEO
CHECKED:
DATE:
ENGINEER V
DIRECTOR III
DISTRICT ENGINEER
DATE:
DATE:
4
OF 18