If we all could imagine a world without waste production nor work
inefficiency, the life's of many companies would still be alive today up and running. The production of waste causes major environmental impacts and implies the use of material, energy and the depletion of the Earth's renewable and non-renewable resources. Waste issues and their solutions are inevitably linked to the production and consumption of a series of industrial techniques or methods that are appropriate for obtaining the highest form of optimization of waste production and the answer to greatly increasing profits in enterprises, and this techniques are: Industrial Engineering Methods and Lean production methods.
There are seven wastes from the point of lean production:
inventory, overproduction, waiting, unnecessary transport, extra action, defective products and excess processing. In the method of Industrial Engineering we can find a series of techniques that allow the elimination of the seven wastes: 1) Four principles of ECRS: an analysis and optimization techniques of industrial engineering. The content of ECRS is eliminate, combine, rearrange and simple.
2) Method research: includes process analysis, operations analysis
and motion analysis. It analyzes the system from the three aspects of motilin, operating and procedures, to detect and eliminate extra action, unnecessary transport and time wasted during production. 3) Logistic planning: is to analyze worthless activities of logistics of the production site: whether exists the unnecessary inventory, unnecessary handling, unnecessary waiting, etc. In the Lean production methods we are confronted with a series of processes that allows us to be sure of the elimination of waste production. As a first process, we have the effectiveness in the use of human work, machinery, materials and production to make sure that we are attacking the appropriate quantity and quality of products in the time and place. As a result of this, we achieve a minimum capital investment and a maximum output over the industry. On a second process we have Standard Work, which is the basis for improving operating efficiency, but also the basis for improvement, and the ultimate goal is to eliminate all waste. There are three elements for standard operation; take time, production order and the number of standard products. On a third basis of a process, exists Level Production, which is to ensure each job nodes close together in the production process, neither more production, neither fewer production, so there would be no in-process inventory so everything can be optimized to its maximum capacity. Then we have Pull Production, that can be seen as the direct demand of the customer over what the enterprise produces (what the customer needs) and if this is applied correctly in the right direction, it can reduce greatly the quantity and inventory pressure of funds. As number five arrives, we have Total Productive Maintenance, that can be interpreted as team cooperation. Emphasizing full efficiency, system-wide and full staff participate, in order to develop and maintain a long-term preventative maintenance program in order to acquire the device as the target. The last process that can be found to enclose the lean production methods, is the Total Quality Management (TQM) which attacks the quality environment of the company. With the support of statistics,
professional support, management techniques on scientific
background, we can create a product that provides and meets all consumers needs in a complete and effective way. In conclusion, we can state that there are a lot of effective ways to eliminate waste. With source of study and analysis, we can be sure of the reduction of the seven wastes in a company (inventory, overproduction, waiting, unnecessary transport , extra action, defective products and excess processing) achieving a well management process and, of course, the maximum profit production. Another good thing that comes by applying a method that reduces waste, is the outcome of eliminating a great deal of costs that affect in a direct way to the companys cash flow and economic department. In this essay, we developed some Industrial Engineering Methods and some of the most efficient Lean production methods that exist for the elimination of wastes in the industry.