Sunteți pe pagina 1din 132

Title: Test Run

MSE WALL DESIGN SPREADSHEET

By:
Checked:

README

Directions:
This spreadsheet is to be used as an aid for designing and analyzing MSE walls. The spreadsheet contains five tabs:
"README", "INPUT", "WORKSHEET_FINAL", "WORKSHEET_CONSTR", and "OUTPUT". The "README" tab
outlines the design criteria and provides sketches of various MSE wall configurations. The "INPUT" tab contains all the
input necessary to complete the design/analysis of the MSE wall. The "WORKSHEET_FINAL" tab performs all internal
and external stability calculations for the completed in-service MSE wall structure. The "WORKSHEET_CONSTR" tab
performs the external and internal stability calculations for the temporary construction loading condition. The
"OUTPUT" tab presents an output table which summarizes the external and internal stability checks, indicates the
controlling design locations, and calculates performance ratios for the controlling locations. The performance ratio is
taken as a ratio of the allowable to the actual. Performance ratios greater than or equal to 1.0 are "OK", while
performance ratios less than 1.0 are "NG!". For further information, refer to the Manual for this spreadsheet.

Design Criteria:
AASHTO LRFD Bridge Design Specifications 5th Edition with 2010 Interim Revisions, Section 11.10 Mechanically
Stabilized Earth Walls. Any sections referenced in Section 11.10 will follow the AASHTO LRFD as modified by
PennDOT Design Manual Part 4 (DM-4), Part B Design Specifications, except as noted.
Color Coding:
- Denotes Input Cells
- Internal Calculations by the spreadsheet
- External Stability Checks
Red Text - Red Text will indicate warnings and errors where applicable
Sketches:

Title: Test Run

By:
Checked:

MSE WALL DESIGN SPREADSHEET

README

Figure A11.10.2-1 - MSE Wall Element Dimensions Needed for Design

Figure 1. AASHTO Figure 3.11.5.8.1-1 Earth


Pressure Distribution for MSE Wall with Level Backfill
Surface

Figure 2. AASHTO Figure 3.11.5.8.1-2 Earth Pressure


for MSE Wall with Sloping Backfill Surface

Figure 3. AASH
Distribution for

Title: Test Run

By:
Checked:

MSE WALL DESIGN SPREADSHEET

Figure 8. AASHTO Figure 11.10.7.1-1a - Seismic


External Stability of a MSE Wall, Level Backfill
Condition

README

Figure 9. AASHTO Figure 11.10.7.1-1b - Seismic External


Stability of a MSE Wall, Sloping Backfill Condition

Figure 11. Barrier Moment Slab Loading Scenario

Discontinuous Geosynthetic Sheets:

Title: Test Run

MSE WALL DESIGN SPREADSHEET

By:
Checked:

README
Discontinuous Geosynthetic Sheets:

Continuous Geosynthetic Sheets

Rc = Reinforcement coverage ratio = b / Sh

Use Rc = 1 for continuous geosynthetic sheets (i.e.,

Figure 18. AASHTO Figure 11.10.6.4-1 Reinforcement Coverage Ratio for Metal
Reinforcement

Figure 19. AASHTO Figure 11.10.6.4-2 Reinf


Geosynthetic Reinforcement

Date:
Date:

README

et contains five tabs:


"README" tab
UT" tab contains all the
ab performs all internal
HEET_CONSTR" tab
ndition. The
cks, indicates the
performance ratio is
e "OK", while
preadsheet.

.10 Mechanically
s modified by

sure

Date:
Date:

README

Figure 3. AASHTO Figure 3.11.5.8.1-3 Earth Pressure


Distribution for MSE Wall with Broken Backfill Surface

Date:
Date:

README

us Geosynthetic Sheets:

ith Layer

Figure 20. AASHTO Figure 11.10.7.2-1 Seismic Internal


Stability of a MSE Wall

Figure 14. Abutment Loading Scenario

Date:
Date:

README

us Geosynthetic Sheets:

ntinuous Geosynthetic Sheets

ement coverage ratio = b / Sh


continuous geosynthetic sheets (i.e., Sh = b = 1 unit width)

HTO Figure 11.10.6.4-2 Reinforcement Coverage Ratio for


einforcement

Title: Test Run

By:
Checked:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

INPUT

INPUT DATA:
Description

Variable

Height of wall:

H=
Lwall =

Units

Value

ft

15.97

ft

43.16

ft
--------->
deg

0.46
h

WARNINGS / ERRORS:

External Geometry:
Length of wall:

Twall =
Thickness of wall facing elements:
Type of backfill slope: h = horizontal, s = sloping, b = broken
=
Angle of backfill slope:
hB =
Height of backfill above wall (for broken backfill only):
Is there an abutment (supported on piles) in the reinforcing zone? y = yes, n = no
Ah =
Total height of fill behind abutment, from bottom of footing to bottom of roadway (see Figure 14):
Thickness of abutment footing (see Figure 14):

ft
--------->

ft

7.64

Af =

ft

Ad =

ft
--------->

1
n

Distance from bottom of abutment footing to top of wall (see Figure 14):
Is there an abutment backwall present? y = yes, n = no
cf =
Dist. from back of wall to front edge of abutment, or to back face of barrier (see Figures 11 & 14):

ft

0.53

Width of abutment footing or barrier moment slab (see Figures 11 & 14):

bf =

ft

5.25

Width of parapet/barrier (from back face to edge of pavement):


Distance from back of MSE wall to centroid of linear vertical footing load, P V [A3.11.6.3-1]:

pw =

ft

d=

ft

3.155

Soil / Rock Properties:


Unit weight of reinforced soil (specified backfill):

r =

pcf

120

Friction angle of reinforced soil (specified backfill):

r =

deg

34

Unit weight of retained fill (embankment backfill):

f =

pcf

120

deg
--------->

30
s

deg

31

f =
Friction angle of retained fill (embankment backfill):
Is the base material soil or rock? s = soil, r = rock
b =
Friction angle of base soil:

334809043.xlsx INPUT

Page 9 of 132

WARNING - MSE Wall design re


--------->

10/26/2016 14:39:56

Title: Test Run

By:
Checked:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

INPUT
Saturated unit weight of base soil:
Moist unit weight of base soil:
cohesion of base soil:

Undrained shear strength of cohesive soils (for sliding resistance of clay):

' =
m =
c=
Su =
Df =

Depth of wall below ground surface (front face embedment) [A11.10.2.2]:


Is the ground sloped in front of the structure (i.e. wall constructed on a slope)? y = yes, n = no
If "yes", enter horiz. component of slope in front of structure (e.g. "3" for 3H:1V slope) [A11.10.2.2]:
HC =
Ncq =
fied bearing capacity factor for walls adjacent to slopes (cohesive soil term) [Fig. A10.6.3.1.2c-1]:

pcf

120

pcf
tsf

115
0

tsf
ft
--------->
dim

3
n

dim

ied bearing capacity factor for walls adjacent to slopes (cohesionless term) [Fig. A10.6.3.1.2c-2]:

Nq =

dim

Compression strength of rock sample (base material):

Co =

tsf

Depth from footing base down to highest anticipated groundwater level [D10.6.3.1.2gP]:

zw =

ft

Coefficient Nms to estimate nominal bearing resistance of rock [D10.6.3.2.2-1P]:


Resistance factor for sliding resistance between soil and foundation [D10.5.5.2.2]:

Nms =
=

dim
dim

1.00

Resistance factor for bearing [D10.5.5.2.2]:

b =

dim

0.45

Resistance factor for bearing for seismic loading [A10.5.5.3.3]:

s =

dim

1.00

334809043.xlsx INPUT

Page 10 of 132

WARNING - ENSURE DEPTH M

10/26/2016 14:39:56

Title: Test Run

By:
Checked:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

INPUT

Loading Information:
Unit weight of wall facing elements (for wall self-weight):
Weight of roadway dead load (wearing surface, subbase, etc.):
Equivalent height of soil for live load surcharge (LS) [D3.11.6.4]:

DC =
DW =
heq =

kcf
ksf

0.150
0.09

ft

ft

Equivalent height of soil for temporary construction live load surcharge (LS) [D11.6.1.2]:

heq_t =

Horizontal traffic impact/collision load on barrier, for tension (10k/5ft = 2.0 k/ft) [A11.10.10.2]:

PH1 (tens) =

k/ft

Horizontal traffic impact/collision load on barrier, for pullout (10k/20ft = 0.5 k/ft) [A11.10.10.2]:

PH1 (pull) =

k/ft

Linear vertical load of wet concrete abutment footing [A3.11.6.3-1]:

PV =

k/ft

2.363

Horizontal force per foot on abutment due to unfactored longitudinal superstructure loads:

PH1a =

k/ft

1.4

--------->
--------->
--------->
--------->
--------->

s
r

Reinforcement Data / Internal Geometry:


Type of Reinforcement: s = steel strip, g = geosynthetic, m = steel bar grid/mat, w = welded wire grid
Type of steel strips: s = smooth, r = ribbed (Enter for steel strip reinforcement only)
Type of Geosynthetic: d = geogrid, t = geotextile (Enter for geosynthetic only)
Does connection to wall rely on friction or is it mechanical? f = friction, m = mechanical (for geosynthetic only)
Does the wall facing consist of geosynthetic material overlapped with main soil reinforcement? y = yes, n = no
Loverlap =
If "yes" to both above (i.e. friction connection), enter overlap length of facing with reinforcement:
Is the reinforcement continuous along the wall? (e.g., grids and sheets) y = yes, n = no
Is the wall face itself made of segmental block? y = yes, n = no
Soil-reinforcement interface friction angle (default value of 2/3f is used if not entered) [A11.10.5.3]:
=
Was tan determined experimentally based on soil to reinforcement contact? y = yes, n = no
Fy =
Yield strength of steel reinforcement:

n
(Enter in table below)
n
n

deg
--------->

ksi

60

ft

21

Depth to reinforcement Layer 1 below top of wall:


Vertical spacing of reinforcement (Enter "v" for variable spacing):

L=
Z1 =

ft

1.5

Sv =

ft

2.46

Horizontal spacing of reinforcement:

Sh =

ft

Length of reinforcing [Note: Lmin = max (0.7 * (H + Ah - Ad), or 8 ft)]:

334809043.xlsx INPUT

ft
--------->
--------->

Page 11 of 132

(Enter in table below)

10/26/2016 14:39:56

Title: Test Run

By:
Checked:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

INPUT
Width of reinforcing strips or grids:

in.

(Enter in table below)

each

(Enter in table below)

in.
in.

(Enter in table below)


(Enter in table below)

in.
in.
in.2

(Enter in table below)


(Enter in table below)

Area of reinforcing as determined by corrosion specialist (for aggressive soils only):

t=
Ac* =

Strength reduction factor for installation damage to geosynthetic reinforcement [A11.10.6.4.2b]:

RFID =

dim

Strength reduction factor for long-term creep of geosynthetic reinforcement [A11.10.6.4.2b]:

RFCR =

dim

Strength reduction factor for chemical and biological degradation [A11.10.6.4.2b]:


Surface area geometry factor for pullout design [A11.10.6.3.2]:
Coefficient of uniformity for ribbed steel strips (Enter "4" if unknown) [A11.10.6.3.2]:

RFD =

dim
dim

dim

Long-term connection strength reduction factor [A11.10.6.4.4b]:


Tensile resistance factor for static loading [A11.5.6-1]:
Tensile resistance factor for combined static/earthquake loading [A11.5.6-1]:
Pullout resistance factor for static loading [A11.5.6-1]:
Pullout resistance factor for combined static/earthquake loading [A11.5.6-1]:

dim
dim
dim
dim
dim

(Enter in table below)


0.75
1.00
0.90
1.20

Ultimate geosynthetic reinforcement tensile resistance (Static load component):

CRcr =
=
=
=
=
Srs =

t/ft

(Enter in table below)

Ultimate geosynthetic reinforcement tensile resistance (Dynamic load component):

Srt =

t/ft

(Enter in table below)

Number of longitudinal bars per grid:


Total thickness of reinforcing strips:
Diameter of bar or wire:
Spacing of steel grid cross bars:
Diameter of steel grid cross bars:

334809043.xlsx INPUT

Page 12 of 132

b=
Nb =
Tr =
D=
St =

C=
Cu =

(Enter in table below)

10/26/2016 14:39:56

Title: Test Run

By:
Checked:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

INPUT

Geometry of Reinforcement Layers Behind Abutment:


(Note: Reinforcement Data for layers behind abutment must be entered in separate table below)
Depth to abutment Layer 1 reinforcement below roadway pavement (see Figure 14):

Z1a =

ft

5.39

Vertical spacing of reinforcement, if applicable (Enter "v" for variable, see Figure 14):

Sva =

ft

0.75

Factored Facing unit connection capacity for Strength limit state: CC (STR) =
Factored Facing unit connection capacity for Extreme Event limit state: CC (EXT) =
AS =
Seismic peak ground acceleration coefficient, modified by short-period site factor (A3.10.4):

t/ft
t/ft

Other:

dim

(Enter in table below)


(Enter in table below)
0.05

TABLE FOR LAYERS OF REINFORCEMENT BEHIND MSE WALL


REINFORCEMENT DATA NEEDS TO BE ENTERED FOR
Layer
#
1
2
3
4
5
6
7
8
9
10
11
12

Depth, Z
ft
1.50
3.96
6.42
8.88
11.34
13.80
-------------

Sv

Sh

ft
2.73
2.46
2.46
2.46
2.46
3.40
-------------

ft
2.48
2.48
2.48
2.48
2.48
2.48

334809043.xlsx INPUT

b
in.
2
2
2
2
2
2

Nb

Tr

each

in.
0.163
0.163
0.163
0.163
0.163
0.163

D
in.

Page 13 of 132

St
in.

6
t
in.

LAYERS OF REINFORCEMENT
Ac*

CRcr

Srs

in.

dim

t/ft

10/26/2016 14:39:56

Title: Test Run

By:
Checked:

MSE WALL DESIGN SPREADSHEET


13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

-------------------------------------------------------------

334809043.xlsx INPUT

Date:
Date:

INPUT

-------------------------------------------------------------

Page 14 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Checked:

Date:
Date:

MSE WALL DESIGN SPREADSHEET


43
44
45
46
47
48
49
50

-----------------

INPUT

-----------------

TABLE FOR LAYERS OF REINFORCEMENT BEHIND ABUTMENT


REINFORCEMENT DATA CAN BE ENTERED FOR A MAXIMUM OF
Layer
#
1
2
3
4
5
6
7
8
9
10

Depth, Za

Sv

Sh

ft
5.39
6.14
6.89
---------------

ft
1.13
0.75
1.13
---------------

ft
2.48
2.48
2.48

334809043.xlsx INPUT

b
in.
2
2
2

Nb

Tr

each

in.
0.163
0.163
0.163

D
in.

Page 15 of 132

St
in.

3
t
in.

LAYERS OF REINFORCEMENT
Ac*

CRcr

Srs

in.

dim

t/ft

10/26/2016 14:39:56

Title: Test Run

By:
Checked:

MSE WALL DESIGN SPREADSHEET

334809043.xlsx INPUT

Date:
Date:

INPUT

Page 16 of 132

10/26/2016 14:39:56

WARNINGS / ERRORS:

WARNING - MSE Wall design requires check of specified backfill weight ranging from 90pcf to 120pcf per BC-799M. User is responsible for checking the minimum and maximum va
ka f =

0.040

>

0.035

ksf/ft

Minimum design earth pressure [D3.11.5.5]

--->

334809043.xlsx INPUT

Page 17 of 132

10/26/2016 14:39:56

WARNING - ENSURE DEPTH MEETS MINIMUM REQUIREMENTS FOR FROST PROTECTION.

334809043.xlsx INPUT

Page 18 of 132

10/26/2016 14:39:56

334809043.xlsx INPUT

Page 19 of 132

10/26/2016 14:39:56

334809043.xlsx INPUT

Page 20 of 132

10/26/2016 14:39:56

SE WALL

Srt
t/ft

CC (STR)
t/ft
5
5
5
5
5
5

CC (EXT)
t/ft
6
6
6
6
6
6

334809043.xlsx INPUT

Loverlap
ft

WARNINGS / ERRORS:
(NOTE: ONLY LAYER #1 IS CHECKED)

Page 21 of 132

10/26/2016 14:39:56

334809043.xlsx INPUT

Page 22 of 132

10/26/2016 14:39:56

MENT

Srt
t/ft

CC (STR)
t/ft
5
5
5

CC (EXT) WARNINGS / ERRORS:


t/ft
(NOTE: ONLY LAYER #1 IS CHECKED)
6
6
6

334809043.xlsx INPUT

Page 23 of 132

10/26/2016 14:39:56

334809043.xlsx INPUT

Page 24 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

WORKSHEET_FINAL
Units

Active earth pressure coefficient (for External Stability)


Geometry:
Theoretical angle of broken backfill slope
Notional height of earth pressure diagram
Notional height of earth pressure diagram (for Seismic Loads)
Notional height of Active Zone
Depth of horizontal stress distribution Internal
Depth of horizontal stress distribution External
Depth Z2 for PV load effective width D1 (for external stability)

Date:
Date:

Horiz.

Type of Backfill
Sloping
Broken

USE

ka

0.333

0.333

0.333

0.333

0.00
22.61

0.00
15.97

0.00
15.97

0.00
22.61

ft

h
H2

22.61

15.97

15.97

22.61

ft

H1

15.97

15.97

15.97

15.97

ft

l1

10.87

10.87

10.87

10.87

ft

l2

0.00

0.00

0.00

0.00
0.00

deg
ft

ft

Z2_ext

Effective width of applied load PV at depth Z2 (external stability)

ft

D1_Z2

0.00

Effective width of applied load PV at depth H (external stability)

ft

D1_H

0.00

Width of active zone behind reinforced soil mass


Length from start of bf to end of reinforced soil mass

ft

Aw

ft

Percentage of footing width, bf, within the reinforced soil mass

x
bfi

Percentage of footing width, bf, outside the reinforced zone

%
ft

Theoretical wall base width (including thickness of facing)


Failure plane of extensible reinforcement

Unfactored Loads:
Force resultant of earth pressure from retained fill (EH)
Horizontal component of Pa force
Vertical component of Pa force
Vertical load of reinforced soil mass (EV)

334809043.xlsx WORKSHEET_FINAL

deg

13.05

9.22

9.22

20.47
100.0%

bfe

0.0%
21.46

B
r

Units

13.05

62.00

Horiz.

Sloping

Broken

USE

Moment
arm from
toe (ft)

t/ft

Pa

t/ft

Pah

5.11

5.11

5.11

5.11

7.54

t/ft

Pav

0.00

0.00

0.00

0.00

21.46

t/ft

V1

20.12

10.96

Page 25 of 132

5.11

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_FINAL
t/ft

V2

0.00

14.46

t/ft
t/ft2

V3

0.55

0.23

q LS

0.18

t/ft

q LS_int

0.13

Vertical resultant of live load surcharge, q LS (used for bearing)

t/ft

F1_q LS

2.74

2.74

2.74

13.85

Horizontal force due to live load surcharge, q LS

t/ft

F2_q LS

1.36

0.96

1.36

11.31

Horizontal force on abutment due to live load surcharge, q LS

t/ft
t/ft2

F2a_q LS

0.46

0.46

0.46

q DW

0.05

t/ft

q DW_int

0.03

Vertical force due to roadway surcharge, q DW , above reinf. soil

t/ft

F1_q DW

0.68

0.68

0.68

13.85

Horizontal force due to roadway surcharge, q DW

t/ft

F2_q DW

0.34

0.24

0.34

11.31

Horizontal force on abutment due to roadway surcharge, q DW

t/ft
t/ft2

F2a_q DW

0.11

0.11

0.11

q ES

0.40

t/ft2

q ES_int

0.29

t/ft

F1_q ES

6.06

6.06

6.06

Horizontal earth pressure resultant force on abutment (EH)


Vertical load of wet concrete abutment footing, P V (ES)

t/ft

F2a_EH

0.58

0.58

0.58

t/ft

PV

1.18

Vertical load PV for external stability checks

t/ft

PV_ext

1.18

3.62

Horiz. resultant due to PV surcharge, for external stability (ES)

t/ft

Fp (Pv)

0.00

0.00

Horizontal force on abutment due to superstructure loads

t/ft

PH1a

0.70

12.35

Horiz. CT load, portion within reinforced zone

t/ft

PH1

0.00

18.99

Horiz. CT load, portion within reinforced zone (for internal pullout)

t/ft

PH1_pullout

0.00

Vertical load of sloped fill above reinforced soil mass (EV)


Vertical load due to self-weight of wall facing elements (DC)
Vertical live load surcharge pressure (LS)
Vertical live load surcharge for v internal (q LS distributed to Lreinf)

Vertical earth surcharge (ES) due to roadway dead load, DW


Vertical earth surcharge for v internal (q DW distributed to Lreinf)

Vertical earth surcharge (ES) due to weight of abutment backfill


Vertical earth surcharge for v internal (q ES distributed to Lreinf)
Vertical force due to earth surcharge, q ES, above reinforced soil

334809043.xlsx WORKSHEET_FINAL

Page 26 of 132

0.00

0.00

0.00

13.85
13.85

(uses a minimum pressure

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


Horiz. CT load, portion outside reinforced zone

334809043.xlsx WORKSHEET_FINAL

Date:
Date:

WORKSHEET_FINAL
t/ft

PH2

Page 27 of 132

0.00

22.61

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_FINAL

Seismic Loads:

Units

Maximum earthquake acceleration coefficient

Horiz.

Sloping

Broken

USE

Am

0.07
0.76

7.99

0.00

18.18

Seismic inertial force of reinforced soil

t/ft

Pir

Seismic inertial force of sloped fill above reinforced soil


50% of Dynamic thrust load PAE from retained fill

t/ft

Pis

t/ft

0.5 PAE

t/ft

0.5 PAEh

0.40

0.40

0.40

0.40

13.57

t/ft

0.5 PAEv

0.00

0.00

0.00

0.00

21.46

t/ft

Wa

3.44

3.44

#DIV/0!

3.44

t/ft

Pi

0.24

0.24

#DIV/0!

0.24

Horizontal component of 0.5 PAE


Vertical component of 0.5 PAE
Weight of the active zone
Internal inertial force

0.00

0.00

0.00

0.40

Load Factors:
LOAD
FACTOR
DC
DW v

DW h
EV [1]
EH [1]
ESv
ESh
LS
EQ
CT
Notes:

1.00

MIN
0.90

MAX
1.25

MIN
0.90

MAX
1.25

EXTREME I
MIN
MAX
0.90
1.25

1.00

0.65

1.50

0.65

1.50

0.65

1.50

1.00
1.00
1.00

1.50
1.00
1.50

1.50
1.35
1.50

1.50
1.00
1.50

1.50
1.35
1.50

1.50
1.00

1.50
1.35

1.00

0.75

1.50

0.75

1.50

0.75

1.00
1.00

1.50
1.75

1.50
1.75

1.50

1.50

1.50
0.00
1.00

SERV I

[1]

STR I

STR III

EXTREME II
MIN
MAX
0.90
1.25

1.00
1.50

1.35
1.50

1.50

0.75

1.50

1.50
0.00
1.00

1.50
0.50

1.50
0.50

1.00

1.00

Factors for EV and EH for redundancy check are 1.0 and 1.1, respectively [D11.10.6.4.5P]

334809043.xlsx WORKSHEET_FINAL

Page 28 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_FINAL

FACTORED LOADS:
VERTICAL:
V3

(DC)

V1

(EV)

V2
Pav

(EH)

PV_ext
F1_q DW

(ESv)

F1_q ES
F1_q LS

(LS)

0.5 PAEv

MIN

MAX

MIN

MAX

EXTREME I
MIN
MAX

EXTREME II
MIN
MAX

0.55

0.50

0.69

0.50

0.69

0.50

0.69

0.50

0.69

20.12

20.12

27.16

20.12

27.16

20.12

27.16

20.12

27.16

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.18

0.89

1.77

0.89

1.77

0.89

1.77

0.89

1.77

0.68

0.51

1.03

0.51

1.03

0.51

1.03

0.51

1.03

6.06

4.55

9.10

4.55

9.10

4.55

9.10

4.55

9.10

2.74

4.79

4.79

0.00

0.00

0.00

0.00

1.37

1.37

SERV I

STR I

STR III

(EQ)
V (bearing) =

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

31.34

31.36

44.54

26.57

39.75

26.57

39.75

27.94

41.12

t/ft

V (OT & sliding) =

28.60

26.57

39.75

26.57

39.75

26.57

39.75

26.57

39.75

t/ft

334809043.xlsx WORKSHEET_FINAL

Page 29 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


HORIZONTAL:
Pah

(EH)

F2_q DW
PH1a

(ESh)

Fp (Pv)
F2_q LS

(LS)

Pir
Pis

(EQ)

0.5 PAEh
PH1
PH2

(CT)
H=

Date:
Date:

WORKSHEET_FINAL

MIN

MAX

MIN

MAX

EXTREME I
MIN
MAX

EXTREME II
MIN
MAX

5.11

7.67

7.67

7.67

7.67

0.00

0.00

7.67

7.67

0.34

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.51

0.70

1.05

1.05

1.05

1.05

1.05

1.05

1.05

1.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.36

2.37

2.37

0.00

0.00

0.00

0.00

0.68

0.68

0.00

0.00

0.00

0.00

0.00

0.76

0.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.40

0.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
7.51

0.00
11.60

0.00
11.60

0.00
9.23

0.00
9.23

0.00
2.72

0.00
2.72

0.00
9.91

0.00
9.91

Moment
Arm (ft)

SERV I

MIN

MAX

MIN

MAX

EXTREME I
MIN
MAX

EXTREME II
MIN
MAX

0.23

0.13

0.11

0.16

0.11

0.16

0.11

0.16

0.11

0.16

10.96

220.54

220.54

297.73

220.54

297.73

220.54

297.73

220.54

297.73

14.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

21.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SERV I

STR I

STR III

t/ft

EXTERNAL STABILITY:
OVERTURNING:
Vertical Load
Moments:
V3
(DC)
V1
V2
Pav

(EV)
(EH)

334809043.xlsx WORKSHEET_FINAL

STR I

STR III

Page 30 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


PV_ext
F1_q DW

(ESv)

F1_q ES
0.5 PAEv

(EQ)
MV =

Horizontal Load
Moments:
Pah
(EH)
F2_q DW
PH1a

(ESh)

Fp (Pv)
F2_q LS

(LS)

Pir
Pis

(EQ)

0.5 PAEh
PH1
PH2

(CT)

Date:
Date:

WORKSHEET_FINAL

3.62

4.27

3.20

6.41

3.20

6.41

3.20

6.41

3.20

6.41

13.85

9.49

7.11

14.23

7.11

14.23

7.11

14.23

7.11

14.23

13.85

83.98

62.99

125.97

62.99

125.97

62.99

125.97

62.99

125.97

21.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

318.40

293.96

444.49

293.96

444.49

293.96

444.49

293.96

444.49

Moment
Arm

SERV I

7.54

MIN

MAX

MIN

MAX

EXTREME I
MIN
MAX

38.53

57.79

57.79

57.79

57.79

0.00

0.00

57.79

57.79

11.31

3.83

5.75

5.75

5.75

5.75

5.75

5.75

5.75

5.75

12.35

8.64

12.96

12.96

12.96

12.96

12.96

12.96

12.96

12.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.31

15.34

26.84

26.84

0.00

0.00

0.00

0.00

7.67

7.67

7.99

0.00

0.00

0.00

0.00

0.00

6.05

6.05

0.00

0.00

18.18

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13.57

0.00

0.00

0.00

0.00

0.00

5.46

5.46

0.00

0.00

18.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

22.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

66.34

103.35

103.35

76.51

76.51

30.23

30.23

84.18

84.18

MH =

334809043.xlsx WORKSHEET_FINAL

STR I

STR III

Page 31 of 132

EXTREME II
MIN
MAX

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_FINAL

ECCENTRICITY:
1
SERV I

3
MAX
39.75

STR III
MIN
MAX
26.57
39.75

6
7
EXTREME I
MIN
MAX
26.57
39.75

STR I

8
9
EXTREME II
MIN
MAX
26.57
39.75

V=
Xo

(t/ft)

28.60

MIN
26.57

(ft)

8.81

7.18

8.58

8.19

9.26

9.93

10.42

7.90

9.06

eB

(ft)

1.92

3.55

2.15

2.54

1.47

0.80

0.31

2.83

1.67

(ft)
PERF. RATIO =
CONTROLLING = 1
Check eB eB max:

5.37
2.80
0

5.37
1.51
1

5.37
2.50
0

5.37
2.11
0

5.37
3.64
0

5.37
6.68
0

5.37
17.42
0

5.37
1.89
0

5.37
3.22
0

OK

OK

OK

OK

OK

OK

OK

OK

OK

eB max

SLIDING:
For Cohesionless soil or rock

R = V * tan

[D10.6.3.4-1]

For Cohesive soil

R = V * tan + ca B'

[D10.6.3.4-3P]

= min [ r, b, (if cont. reinf.) ]

31.0

ca = c (0.21 + 0.27/c) 1.0

0.00
SERV I

STR I

V=
B' =
R =

(t/ft)
(ft)
(t/ft)

28.60
17.62
17.19

MIN
26.57
14.35
15.96

RR =

(t/ft)

17.19

15.96

334809043.xlsx WORKSHEET_FINAL

deg
tsf

[A11.10.5.3]
[D10.6.3.4-3P, expressed as tons/ft2]

MAX
39.75
17.17
23.88

STR III
MIN
MAX
26.57
39.75
16.37
18.52
15.96
23.88

EXTREME I
MIN
MAX
26.57
39.75
19.85
20.84
15.96
23.88

EXTREME II
MIN
MAX
26.57
39.75
15.79
18.13
15.96
23.88

23.88

15.96

15.96

15.96

23.88

Page 32 of 132

23.88

23.88

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


H=
(t/ft)
PERF. RATIO =
CONTROLLING = 1
Check RR H:

Date:
Date:

WORKSHEET_FINAL

7.51
2.29
0

11.60
1.38
1

11.60
2.06
0

9.23
1.73
0

9.23
2.59
0

2.72
5.87
0

2.72
8.78
0

9.91
1.61
0

9.91
2.41
0

OK

OK

OK

OK

OK

OK

OK

OK

OK

334809043.xlsx WORKSHEET_FINAL

Page 33 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_FINAL

BEARING:
Bearing Capacity Factors:
Nc =
32.67

[C10.6.3.1.2a-2P or 3P (DM-4)]

(Note: For walls adjacent to slopes, the user input N cq term will be used in p

N =

25.99

[C10.6.3.1.2a-4P (DM-4)]

(Note: For walls adjacent to slopes, the user input N q term will be used in p

Nq =
D=
=

20.63
18.97
0.06
90

L > 5B ?

NO

[C10.6.3.1.2a-1P (DM-4)]
[D10.6.3.1.2gP-6]
weighted average of soil unit weight (tons per cubic foot) [D10.6.3.1.2gP]

ft
tcf
deg

(footing is not continuous)

[D10.6.3.1.2a]

V=
Xo =

(t/ft)

31.34

MIN
31.36

MAX
44.54

MIN
26.57

MAX
39.75

EXTREME I
MIN
MAX
26.57
39.75

(ft)

9.25

8.20

9.15

8.19

9.26

9.93

10.42

8.19

9.22

eB =

(ft)
(ft)

1.48
18.51

2.53
16.39

1.58
18.30

2.54
16.37

1.47
18.52

0.80
19.85

0.31
20.84

2.54
16.38

1.51
18.45

SERV I

B' =
sc =

STR I

STR III

EXTREME II
MIN
MAX
27.94
41.12

1.27

1.24

1.27

1.24

1.27

1.29

1.30

1.24

1.27

s =

0.83

0.85

0.83

0.85

0.83

0.82

0.81

0.85

0.83

sq =

1.26

1.23

1.25

1.23

1.26

1.28

1.29

1.23

1.26

ic =
i =
iq =
n=
qn (soil) =

0.61
0.48

0.42
0.28

0.58
0.44

0.45
0.31

0.62
0.49

0.83
0.75

0.88
0.83

0.44
0.30

0.61
0.48

0.63
1.70

0.45
1.72

0.60
1.70

0.48
1.73

0.64
1.70

0.83
1.68

0.89
1.67

0.47
1.72

0.63
1.70

18.14

16.50

17.98

16.48

18.15

19.20

19.97

16.48

18.10

(tsf)

334809043.xlsx WORKSHEET_FINAL

Page 34 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_FINAL

qult (soil) =

(tsf)

8.64

5.14

8.03

5.57

8.84

13.41

15.11

5.43

8.59

qn (rock) =

(tsf)

---

---

---

---

---

---

---

---

---

qn =

(tsf)

8.64

5.14

8.03

5.57

8.84

13.41

15.11

5.43

8.59

(tsf)
q=
(tsf)
PERF. RATIO =
CONTROLLING = 1
Check qR q:

3.89
1.69
2.30
0

2.31
1.91
1.21
1

3.61
2.43
1.48
0

2.51
1.62
1.54
0

3.98
2.15
1.85
0

13.41
1.34
10.02
0

15.11
1.91
7.92
0

2.44
1.71
1.43
0

3.86
2.23
1.73
0

OK

OK

OK

OK

OK

OK

OK

OK

OK

qR =

INTERNAL STABILITY:

(MSE Wall Reinforcement Design)

ka for reinforced soil


S = L tan / 2, or (A1+A2) / L
Z2 (Pv), for PV distr. to D1 (Pv) =

0.283
0.00

ft

2.06

ft

[D3.11.5.8.1-4]
[A11.10.6.2.1-2]
Z2 for distribution of PV surcharge for internal stability [A3.11.6.3-1]

Z2 (q_int), for qint distr. to D1 (q_int) =

12.56

ft

Z2 for distribution of surcharge pressures for internal stability (i.e. q DW_int, q LS_int, q ES_int)

Corrosion Loss (Steel Reinforcement):


Loss of galvanizing (First 2 years):
(Subsequent years):
Loss of carbon steel:
Thickness of galvanized coating =
Time to lose galvanized coating =
Remaining service life =
Total loss of carbon steel =

0.58
0.16
0.47
3.40
16.00
84.00
39.48

mil./yr. =
mil./yr. =
mil./yr. =
mils
yrs
yrs
mils =

334809043.xlsx WORKSHEET_FINAL

[A11.10.6.4.2a]
0.00058 in./yr.
0.00016 in./yr.
0.00047 in./yr.

0.03948 in.

Page 35 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_FINAL

Strength Reduction (Geosynthetic Reinforcement):


RF = RFID x RFCR x RFD
1.00

[A11.10.6.4.3b]
Tensile Resistance

Layer
#
1
2
3
4
5
6
-----------------------------------

Depth, Z
(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-----------------------------------

Tr

Ec

(in.)
0.16
0.16
0.16
0.16
0.16
0.16
-----------------------------------

(in.)
0.08
0.08
0.08
0.08
0.08
0.08
-----------------------------------

334809043.xlsx WORKSHEET_FINAL

D*
(in.)
-0.08
-0.08
-0.08
-0.08
-0.08
-0.08
-----------------------------------

Ac (steel)

Ac (geo.)

Ac

Rc

Tal

Tult

Tal

(steel)

(geosynth.)

(geosynth.)

(in.2)
0.17
0.17
0.17
0.17
0.17
0.17
-----------------------------------

(in.2)
0.33
0.33
0.33
0.33
0.33
0.33
-----------------------------------

(in.2)
0.17
0.17
0.17
0.17
0.17
0.17
-----------------------------------

ratio
0.067
0.067
0.067
0.067
0.067
0.067
-----------------------------------

(t/ft)
30.25
30.25
30.25
30.25
30.25
30.25
-----------------------------------

(t/ft)
-----------------------------------------------

(t/ft)
-----------------------------------------------

Page 36 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------

Date:
Date:

WORKSHEET_FINAL
-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

Page 37 of 132

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


REINFORCEMENT STRENGTH:

Date:
Date:

WORKSHEET_FINAL

STR-I, STR-III, EXT-II

P =

1.35

load factor for determining factored horizontal stress, H

[A11.10.6.2.1-1]

EH =

1.10

load factor for redundancy check (EH loads)

[D11.10.6.4.5P]

EV =

1.00

load factor for redundancy check (EV loads)

[D11.10.6.4.5P]

STRESSES AND MAX. TENSILE FORCES:

Layer

Depth, Z

Sv

D1 (Pv)

D1 (q_int)

kr / ka

(strength)

(STR)

(STR_no LS)

(EXT-II)

(STR)

#
1
2
3
4
5
6
-------------------------

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-------------------------

(ft)
2.73
2.46
2.46
2.46
2.46
3.40
-------------------------

(ft)
5.75
7.26
8.49
9.72
10.95
12.18
-------------------------

(ft)
15.47
16.70
17.93
19.16
20.39
21.00
-------------------------

coeff.
1.66
1.60
1.54
1.48
1.42
1.36
-------------------------

coeff.
0.47
0.45
0.44
0.42
0.40
0.38
-------------------------

(tsf)
0.21
0.16
0.14
0.12
0.11
0.10
-------------------------

(tsf)
0.91
0.97
1.05
1.15
1.25
1.38
-------------------------

(tsf)
0.73
0.80
0.90
1.01
1.12
1.25
-------------------------

(tsf)
0.82
0.89
0.98
1.08
1.19
1.31
-------------------------

(tsf)
0.00
0.00
0.00
0.00
0.00
0.00
-------------------------

334809043.xlsx WORKSHEET_FINAL

kr

Page 38 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------------

Date:
Date:

WORKSHEET_FINAL
-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 39 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-----

-----

-----

STRENGTH CHECKS:

-----

Date:
Date:

WORKSHEET_FINAL
-----

-----

-----

-----

-----

-----

-----

-----

STR-I, STR-III, EXT-II


Tensile Resistance (STR & EXT)

Layer

Depth, Z

t Tal Rc

Tmax

#
1
2
3
4
5
6
-------------------------

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-------------------------

(t/ft)
1.52
1.52
1.52
1.52
1.52
1.52
-------------------------

(t/ft)
1.57
1.46
1.52
1.60
1.67
2.42
-------------------------

334809043.xlsx WORKSHEET_FINAL

Check
t Tal Rc [1]
NG!
OK
OK
NG!
NG!
NG!
-------------------------

Redundant Tensile Resist. (STR)

t Tal Rc

Tmax

(t/ft)
1.02
1.02
1.02
1.02
1.02
1.02
-------------------------

(t/ft)
1.28
1.19
1.24
1.30
1.36
1.97
-------------------------

Page 40 of 132

Check
t Tal Rc
NG!
NG!
NG!
NG!
NG!
NG!
-------------------------

Connection Strength
(controlling of STR & EXT)
t Tac Rc
or CC

Tmax

(t/ft)
5.00
5.00
5.00
5.00
5.00
5.00
-------------------------

(t/ft)
1.57
1.46
1.52
1.60
1.67
2.42
-------------------------

Check
t Tac Rc [1]
OK
OK
OK
OK
OK
OK
-------------------------

Static Componen

TSrs
(t/ft)
-------------------------------------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------------

Date:
Date:

WORKSHEET_FINAL
-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 41 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-----

----Notes:

----[1]

-----

Date:
Date:

WORKSHEET_FINAL
-----

-----

-----

-----

-----

-----

-----

-----

Items marked with asterisk ( * ) indicates that Extreme II (CT) case controls the design.

334809043.xlsx WORKSHEET_FINAL

Page 42 of 132

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_FINAL

REINFORCEMENT PULLOUT:

STR-I, STR-III, EXT-II

Pullout Friction Factor, F*:

[Figure A11.10.6.3.2-1]

Type:
Geotextiles / geogrids

For Z or Zp 20 ft:
0.67 tan r =
0.45

For Z or Zp < 20 ft :
0.67 tanr =
0.45

Ribbed steel strips


Smooth steel strips

tan r =

MIN (1.2 + log Cu, 2.0) - Zp { [MIN (1.2 + log Cu, 2.0) - tan r] / 20

0.40 =
10 (t / St) =

Steel grids
Scale Effect Correction Factor, :
Steel Reinforcements
Geogrids
Geotextiles
=

0.67
0.40

0.40 =
0.40
20 (t / St) - 10 (t / St) (Zp / 20)

0.00

[Table A11.10.6.3.2-1]
1.0
0.8
0.6
1.0
Tmax (for pullout calcs)

Layer

Depth, Z

Zp

#
1
2
3
4
5
6
-----

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-----

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-----

334809043.xlsx WORKSHEET_FINAL

La

Le

kr

Z+S

(active zone)

(eff. length)

F*

(pullout)

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-----

(ft)
4.79
4.79
4.79
4.25
2.78
1.30
-----

(ft)
16.21
16.21
16.21
16.75
18.22
19.70
-----

factor
1.72
1.58
1.44
1.30
1.16
1.02
-----

coeff.
0.47
0.45
0.44
0.42
0.40
0.38
-----

Page 43 of 132

Tmax

(STR_no LS) (STR_no LS)

(tsf)
0.46
0.49
0.53
0.57
0.61
0.64
-----

(t/ft)
1.27
1.21
1.30
1.40
1.49
2.19
-----

(EXT-II)

(EXT-II)

(tsf)
0.00
0.00
0.00
0.00
0.00
0.00
-----

(tsf)
0.52
0.54
0.57
0.61
0.64
0.68
-----

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------------

Date:
Date:

WORKSHEET_FINAL
-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 44 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------

-------------------------

-------------------------

-------------------------

INTERNAL SEISMIC CHECKS:

Date:
Date:

WORKSHEET_FINAL
-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

EXT-I

Am =

0.07

Wa =

3.44

EQ =

1.00

Pi =

0.24

tons/ft

Le =

103.3

ft

tons/ft

TENSILE STRENGTH

PULLOUT RESISTANCE
Geosynthetic Rupture

Layer

Depth, Z

Tmd

#
1
2

(ft)
1.50
3.96

(t/ft)
0.038
0.038

334809043.xlsx WORKSHEET_FINAL

H (EXT-I)

Tmax

Ttotal

t Tal Rc

(tsf)
0.46
0.49

(t/ft)
1.27
1.21

(t/ft)
1.31
1.25

(t/ft)
2.03
2.03

Page 45 of 132

Check
t Tal Rc
OK
OK

Static
TSrs > Tmax

Dynamic
TSrt > Tmd

-----

-----

H (EXT-I)

Tmax

(tsf)
0.46
0.49

(t/ft)
1.27
1.21

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


3
4
5
6
-----------------------------------------------------

6.42
8.88
11.34
13.80
-----------------------------------------------------

0.038
0.039
0.043
0.046
-----------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

0.53
0.57
0.61
0.64
-----------------------------------------------------

Date:
Date:

WORKSHEET_FINAL
1.30
1.40
1.49
2.19
-----------------------------------------------------

1.34
1.44
1.53
2.24
-----------------------------------------------------

2.03
2.03
2.03
2.03
-----------------------------------------------------

Page 46 of 132

OK
OK
OK
NG!
-----------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

0.53
0.57
0.61
0.64
-----------------------------------------------------

1.30
1.40
1.49
2.19
-----------------------------------------------------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

Date:
Date:

WORKSHEET_FINAL
-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

SEISMIC CONNECTION CHECKS:


Steel Reinforcements:

Geosynthetic Reinforcements:

Layer

Depth, Z

Ttotal

CC (EXT)

Check

#
1
2
3

(ft)
1.50
3.96
6.42

(t/ft)
1.31
1.25
1.34

(t/ft)
6.00
6.00
6.00

CC (EXT)
OK
OK
OK

334809043.xlsx WORKSHEET_FINAL

Long-Term Strength
Ttotal
Tult
(t/ft)
1.31
1.25
1.34

(t/ft)
-------

Page 47 of 132

t Tac Rc
(t/ft)
-------

Geosynthetic Connection Stren


Check
t Tac Rc
-------

Static Component
Tmax
TSrs (static)
(t/ft)
1.27
1.21
1.30

(t/ft)
-------

Check
TSrs
-------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


4
5
6
-------------------------------------------------------

8.88
11.34
13.80
-------------------------------------------------------

1.44
1.53
2.24
-------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

6.00
6.00
6.00
-------------------------------------------------------

Date:
Date:

WORKSHEET_FINAL
OK
OK
OK
-------------------------------------------------------

1.44
1.53
2.24
-------------------------------------------------------

-------------------------------------------------------------

Page 48 of 132

-------------------------------------------------------------

-------------------------------------------------------------

1.40
1.49
2.19
-------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-----------------------------------

-----------------------------------

-----------------------------------

INTERNAL STABILITY:

Layer
#
1
2
3
-----

-----------------------------------

Date:
Date:

WORKSHEET_FINAL
-----------------------------------

-----------------------------------

-----------------------------------

-----------------------------------

-----------------------------------

-----------------------------------

Ac (steel)

Ac (geo.)

Ac

Rc

Tal (steel)

(in.2)
0.17
0.17
0.17
-----

(in.2)
0.33
0.33
0.33
-----

(in.2)
0.17
0.17
0.17
-----

ratio
0.067
0.067
0.067
-----

(t/ft)
30.25
30.25
30.25
-----

-----------------------------------

-----------------------------------

(for Reinforcing behind Abutment)

Depth, Za

Tr

Ec

(ft)
5.39
6.14
6.89
-----

(in.)
0.16
0.16
0.16
-----

(in.)
0.08
0.08
0.08
-----

334809043.xlsx WORKSHEET_FINAL

D*
(in.)
-0.08
-0.08
-0.08
-----

Page 49 of 132

Tensile Resistance
Tult (geo.)
Tal (geo.)
(t/ft)
-----------

(t/ft)
-----------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-----------

-----------

-----------

-----------

REINFORCEMENT STRENGTH:
(Abutment Reinf.)

WORKSHEET_FINAL
-----------

-----------

-----------

-----------

-----------

-----------

-----------

-----------

STR-I, STR-III
Tensile
Resist.

Layer

Depth, Za

Sv

kr / ka

kr

Tmax

#
1
2
3
---------------

(ft)
5.39
6.14
6.89
---------------

(ft)
1.13
0.75
1.13
---------------

coeff.
1.57
1.55
1.53
---------------

(strength)

(tsf)
0.55
0.59
0.64
---------------

(tsf)
0.23
0.23
0.23
---------------

(tsf)
0.64
0.67
0.69
---------------

(t/ft)
0.72
0.50
0.77
---------------

REINFORCEMENT PULLOUT:
(Abutment Reinf.)

Date:
Date:

0.44
0.44
0.43
---------------

Connection
Strength

Check
t Tal Rc

Check
t Tac Rc

OK
OK
OK
---------------

---------------------

Check
CC (STR)
OK
OK
OK
---------------

STR-I, STR-III, EXT-I

Layer

Depth, Za

La

Le

F*

kr

v (no LS)

(ft)

(ft)

(ft)

factor

(pullout)

(tsf)

(tsf)

(tsf)

334809043.xlsx WORKSHEET_FINAL

Page 50 of 132

STRENGTH
Tmax
Le (req'd)
(t/ft)

(ft)

Check
Le

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


1
2
3
---------------

5.39
6.14
6.89
---------------

1.35
0.90
0.45
---------------

334809043.xlsx WORKSHEET_FINAL

13.87
14.32
14.77
---------------

Date:
Date:

WORKSHEET_FINAL
1.72
1.58
1.44
---------------

0.44
0.44
0.43
---------------

0.37
0.41
0.46
---------------

Page 51 of 132

0.23
0.23
0.23
---------------

0.54
0.56
0.58
---------------

0.60
0.42
0.66
---------------

7.86
5.31
8.20
---------------

OK
OK
OK
---------------

10/26/2016 14:39:56

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


INTERNAL SEISMIC CHECKS:
(Abutment Reinf.)
Am =
0.07

Date:
Date:

WORKSHEET_FINAL

EXT-I

Wa =

0.79

EQ =

1.00

Pi =

0.06

tons/ft

Le =

42.96

ft

tons/ft

TENSION CHECKS

Layer
#
1
2
3
---------------

Depth, Za
(ft)
5.39
6.14
6.89
---------------

Tmd
(t/ft)
0.018
0.018
0.019
---------------

334809043.xlsx WORKSHEET_FINAL

Tmax
(t/ft)
0.60
0.42
0.66
---------------

Ttotal
(t/ft)
0.62
0.44
0.67
---------------

Tensile Resistance
Tult (geo.)
t Tal Rc
(t/ft)
0.00
0.00
0.00
---------------

(t/ft)
2.03
2.03
2.03
---------------

Page 52 of 132

CONNECTION CHECKS

Check
t Tal Rc
OK
OK
OK
---------------

Geosynthetic Rupture
TSrs (static)
Check
(t/ft)
---------------------

TSrs > Tmax


---------------------

TSrt (trans.)
(t/ft)
---------------------

Check
TSrt > Tmd
---------------------

10/26/2016 14:39:57

Minimum design earth pressure [D3.11.5.5]:


ka f =
0.040
>
0.035

A1

A2

ksf/ft ---->

OK

(sloped fill)

334809043.xlsx WORKSHEET_FINAL

Page 53 of 132

10/26/2016 14:39:57

OK

0.00

0.00

(uses a minimum pressure of 0.035 ksf/ft, where applicable)

334809043.xlsx WORKSHEET_FINAL

Page 54 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_FINAL

Page 55 of 132

10/26/2016 14:39:57

A1

A2

0.00

0.00

(sloped fill for seismic)

Active zone of extensible reinforcement


Abroken
c
b
why Div/0?

0.00

0.00

8.49

why Div/0?

334809043.xlsx WORKSHEET_FINAL

Page 56 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_FINAL

Page 57 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_FINAL

Page 58 of 132

10/26/2016 14:39:57

t-ft/ft

t-ft/ft

334809043.xlsx WORKSHEET_FINAL

Page 59 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_FINAL

Page 60 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_FINAL

Page 61 of 132

10/26/2016 14:39:57

ut N cq term will be used in place of Nc shown here.)

ut N q term will be used in place of N shown here.)

334809043.xlsx WORKSHEET_FINAL

Page 62 of 132

10/26/2016 14:39:57

, q LS_int, q ES_int)

334809043.xlsx WORKSHEET_FINAL

Page 63 of 132

10/26/2016 14:39:57

nsile Resistance

Connection Strength

t Tal Rc

t Tal Rc

Tac

t Tac Rc

t Tac Rc

(STR)

(EXT-II)

(geosynth.)

(STR)

(EXT-II)

(t/ft)
1.52
1.52
1.52
1.52
1.52
1.52
-----------------------------------

(t/ft)
2.03
2.03
2.03
2.03
2.03
2.03
-----------------------------------

(t/ft)
-----------------------------------------------

(t/ft)
-----------------------------------------------

(t/ft)
-----------------------------------------------

334809043.xlsx WORKSHEET_FINAL

CC (STR)
(t/ft)
5.00
5.00
5.00
5.00
5.00
5.00
-----------------------------------

CC (EXT)
(t/ft)
6.00
6.00
6.00
6.00
6.00
6.00
-----------------------------------

Page 64 of 132

Geosynthetic Rupture
Resistance
TSrs (static) TSrt (trans.)
(t/ft)
-----------------------------------------------

(t/ft)
-----------------------------------------------

Tensile Strength
(for Redundancy)
Rc
t Tal Rc
(reduced)

0.045
0.045
0.045
0.045
0.045
0.045
-----------------------------------

(t/ft)
1.02
1.02
1.02
1.02
1.02
1.02
-----------------------------------

10/26/2016 14:39:57

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

Page 65 of 132

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

10/26/2016 14:39:57

Max. Tensile Forces

Redundancy Force

Tensile Force for


Geosynthetic Rupture

Vertical stress
(for seismic checks)

Tmax

Tmax

Tmax

Tmax

Tmax

(EXT-II)

(STR)

(STR)

(EXT-II)

(EXT-II)

(STR_red.)

(STR_red.)

(static)

(trans.)

(EXT-I)

(EXT-I)

(tsf)
0.00
0.00
0.00
0.00
0.00
0.00
-------------------------

(tsf)
0.58
0.59
0.62
0.65
0.68
0.71
-------------------------

(t/ft)
1.57
1.46
1.52
1.60
1.67
2.42
-------------------------

(tsf)
0.52
0.54
0.57
0.61
0.64
0.68
-------------------------

(t/ft)
1.42
1.33
1.41
1.50
1.58
2.31
-------------------------

(tsf)
0.47
0.48
0.50
0.53
0.55
0.58
-------------------------

(t/ft)
1.28
1.19
1.24
1.30
1.36
1.97
-------------------------

(t/ft)
-------------------------------------

(t/ft)
-------------------------------------

(tsf)
0.73
0.80
0.90
1.01
1.12
1.25
-------------------------

(tsf)
0.00
0.00
0.00
0.00
0.00
0.00
-------------------------

334809043.xlsx WORKSHEET_FINAL

Page 66 of 132

10/26/2016 14:39:57

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 67 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:57

-----

-----

-----

-----

-----

Geosynthetic Rupture (STR & EXT)


Static Component
Dynamic Component

Tmax (static)
(t/ft)
-------------------------------------

Check
TSrs
OK
OK
OK
OK
OK
OK
-------------------------

TSrt

Tmax (trans.)

(t/ft)
-------------------------------------

(t/ft)
-------------------------------------

334809043.xlsx WORKSHEET_FINAL

Check
TSrt
OK
OK
OK
OK
OK
OK
-------------------------

-----

-----

-----

-----

-----

-----

Check Overlap Length of Geosynthetic Facing:


Loverlap

F*

(input)

(overlap)
-------------------------------------

(ft)
-------------------------------------

Page 68 of 132

v (stress in

Le req'd for
Tmax

overlap zone) (STR_no LS)

(tsf)
-------------------------------------

(ft)
-------------------------------------

Check
Loverlap
(input)

-------------------------------------

10/26/2016 14:39:57

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 69 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:57

-----

-----

-----

334809043.xlsx WORKSHEET_FINAL

-----

-----

-----

-----

Page 70 of 132

-----

-----

-----

10/26/2016 14:39:57

) - tan r] / 20 }

Effective Length Check


resist.zone)

Req'd
Le (STR)

Req'd
Le (EXT-II)

(tsf)
0.52
0.67
0.79
0.92
1.06
1.20
-----

(ft)
11.69
9.50
9.42
9.60
9.99
14.71
-----

(ft)
9.83
7.85
7.66
7.71
7.94
11.61
-----

Tmax

v (stress in

(EXT-II)

(t/ft)
1.42
1.33
1.41
1.50
1.58
2.31
-----

334809043.xlsx WORKSHEET_FINAL

Redundancy Check
Check
Le
OK
OK
OK
OK
OK
OK
-----

H_redund.

Tmax_redund.

(STR_no LS) (STR_no LS)

(tsf)
0.38
0.40
0.43
0.46
0.49
0.53
-----

(t/ft)
1.03
0.99
1.06
1.14
1.21
1.79
-----

Page 71 of 132

Req'd
Le
(ft)
14.28
11.61
11.51
11.73
12.21
17.97
-----

Check
Le
OK
OK
OK
OK
OK
OK
-----

Add'l Le
Needed

Use
Lreinf

(ft)
-----------------

(ft)
21.00
21.00
21.00
21.00
21.00
21.00
-----

10/26/2016 14:39:57

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 72 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:57

-------------------------

-------------------------

Ttotal

Req'd
Le (EXT-I)

(t/ft)
1.31
1.25

(ft)
11.28
9.18

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

RESISTANCE
Check
Le
OK
OK

334809043.xlsx WORKSHEET_FINAL

Page 73 of 132

10/26/2016 14:39:57

1.34
1.44
1.53
2.24
-----------------------------------------------------

9.09
9.25
9.63
14.08
-----------------------------------------------------

OK
OK
OK
OK
-----------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

Page 74 of 132

10/26/2016 14:39:57

-------------------------------------

-------------------------------------

-------------------------------------

synthetic Connection Strength


Dynamic Component
Tmd
TSrt (trans)
(t/ft)
0.038
0.038
0.038

(t/ft)
-------

Overlap Length of Geosynthetic Facing:


Loverlap
Le req'd for
Check
Check
TSrt
-------

334809043.xlsx WORKSHEET_FINAL

(input)

Ttotal (pullout)

Loverlap

(ft)
-------

(ft)
-------

(input)

-------

Page 75 of 132

10/26/2016 14:39:57

0.039
0.043
0.046
-------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_FINAL

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 76 of 132

10/26/2016 14:39:57

-----------------------------------

esistance
t Tal Rc
(t/ft)
1.52
1.52
1.52
-----

-----------------------------------

-----------------------------------

-----------------------------------

Connection Strength
Tac (geo.)
t Tac Rc
CC (STR)
(t/ft)
-----------

(t/ft)
-----------

334809043.xlsx WORKSHEET_FINAL

(t/ft)
5.00
5.00
5.00
-----

-----------------------------------

-----------------------------------

Geosynthetic Rupture
Resistance
TSrs (static) TSrt (trans.)
(t/ft)
-----------

(t/ft)
-----------

Page 77 of 132

10/26/2016 14:39:57

-----------

-----------

-----------

-----------

-----------

-----------

Tmax

Ttotal

Le (req'd)

Add'l Le

(t/ft)

(t/ft)

(ft)

Check
Le

Geosynthetic
Rupture Resist.
Check
TSrs

Check
TSrt

---------------------

N/A
N/A
N/A
---------------

SEISMIC
Tmd
(t/ft)

334809043.xlsx WORKSHEET_FINAL

Needed

Use
Lreinf

Page 78 of 132

10/26/2016 14:39:57

0.018
0.018
0.019
---------------

0.60
0.42
0.66
---------------

0.62
0.44
0.67
---------------

334809043.xlsx WORKSHEET_FINAL

7.59
5.20
7.91
---------------

OK
OK
OK
---------------

---------------------

21.00
21.00
21.00
---------------

Page 79 of 132

10/26/2016 14:39:57

CONNECTION CHECKS
Steel
CC (EXT)
> Ttotal ?
OK
OK
OK
---------------

Geosynthetic Connections:
Tult
t Tac Rc
Check
(t/ft)
0.00
0.00
0.00
---------------

(t/ft)
---------------------

t Tac Rc
---------------------

334809043.xlsx WORKSHEET_FINAL

Static
TSrs (conn.)
Check
(t/ft)
---------------------

TSrs > Tmax


---------------------

Dynamic
TSrt (conn.)
Check
T
> Tmd
(t/ft)
Srt
---------------------

Page 80 of 132

---------------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

WORKSHEET_CONSTR
Horizontal backfill only for construction live loads
Horiz.
USE

Units
Active earth pressure coefficient (for External Stability)
Geometry:
Notional height of earth pressure diagram

ft

Notional height of earth pressure diagram (for Seismic Loads)

ft

Notional height of Active Zone


Theoretical wall base width (including thickness of facing)
Failure plane of extensible reinforcement

Unfactored Loads:

Date:
Date:

ft
ft
deg

ka

0.333

0.333

h
H2

15.97

15.97

15.97

15.97

H1

15.97

15.97
21.46

B
r

Units

62.00

Horiz.

USE

Moment
arm from
toe (ft) Minimum design earth pressure [D3.11
ka f =
5.32
0.040

Horizontal force resultant of earth pressure (EH)

t/ft

Pa

2.55

Vertical load of reinforced soil mass (EV)

t/ft

V1

20.12

10.96

Vertical load due to self-weight of wall facing elements (DC)

V3

0.55

0.23

Vertical live load surcharge pressure (LS)

t/ft
t/ft2

q LS

0.18

Vertical resultant of live load surcharge, q LS (used for bearing)

t/ft

F1_q LS

3.78

3.78

10.96

Horizontal force due to live load surcharge, q LS

F2_q LS

0.96

0.96

7.99

Vertical earth surcharge due to weight of 2 ft add'l backfill (ES)

t/ft
t/ft2

0.12

10.96

Vertical force due to earth surcharge, q ES, above reinforced soil

t/ft

F1_q ES

2.52

10.96

t/ft

PV

Vertical load of wet concrete abutment footing, P V (ES)


Seismic Loads:

q ES

Units

2.52

1.18
Horiz.

USE

Maximum earthquake acceleration coefficient

Am

0.07

Horizontal seismic inertial force of reinforced soil (EQ)

PIR

0.54

334809043.xlsx WORKSHEET_CONSTR

t/ft

Page 81 of 132

7.99

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_CONSTR

50% of horizontal dynamic thrust load P AE from retained fill (EQ)


Weight of the active zone
Internal inertial force

t/ft

0.5 PAE

t/ft

Wa

3.44

3.44

t/ft

Pi

0.24

0.24

0.20

9.58

Load Factors:
LOAD
FACTOR
DC
EV
EH
ESv

ESh
LS
EQ

SERV I

STR I

STR III

EXTREME I
MIN
MAX
0.90
1.25
1.00
1.35

1.00
1.00
1.00

MIN
0.90
1.00
1.50

MAX
1.25
1.35
1.50

MIN
0.90
1.00
1.50

MAX
1.25
1.35
1.50

1.00

0.75

1.50

0.75

1.50

0.75

1.50

1.00
1.00

1.50
1.75

1.50
1.75

1.50

1.50

1.50
0.00
1.00

1.50
0.00
1.00

334809043.xlsx WORKSHEET_CONSTR

Page 82 of 132

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_CONSTR

FACTORED LOADS:
VERTICAL:
V3

SERV I

MIN

STR I
MAX

MIN

STR III
MAX

EXTREME I
MIN
MAX

(DC)
(EV)

0.55

0.50

0.69

0.50

0.69

0.50

0.69

V1

20.12

20.12

27.16

20.12

27.16

20.12

27.16

F1_q ES

(ES)

2.52

1.89

3.78

1.89

3.78

1.89

3.78

F1_q LS

(LS)
V (bearing) =

3.78

6.62

6.62

0.00

0.00

0.00

0.00

26.97

29.12

38.25

22.51

31.63

22.51

31.63

t/ft

V (OT & sliding) =

23.19

22.51

31.63

22.51

31.63

22.51

31.63

t/ft

MIN

MAX

MIN

MAX

EXTREME I
MIN
MAX

HORIZONTAL:

SERV I

STR I

STR III

Pa

(EH)

2.55

3.83

3.83

3.83

3.83

0.00

0.00

F2_q LS

(LS)

0.96

1.68

1.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.54

0.54

0.00
3.51

0.00
5.50

0.00
5.50

0.00
3.83

0.00
3.83

0.20
0.74

0.20
0.74

Moment
Arm (ft)

SERV I

MAX

MIN

MAX

EXTREME I
MIN
MAX

PIR

(EQ)

0.5 PAE

H=

t/ft

EXTERNAL STABILITY:
OVERTURNING:
Vertical Load
Moments:

334809043.xlsx WORKSHEET_CONSTR

STR I
MIN

STR III

Page 83 of 132

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


V3

Date:
Date:

WORKSHEET_CONSTR

(DC)
(EV)

0.23

0.13

0.11

0.16

0.11

0.16

0.11

0.16

V1

10.96

220.54

220.54

297.73

220.54

297.73

220.54

297.73

F1_q ES

(ES)

10.96

27.62

20.71

41.43

20.71

41.43

20.71

41.43

F1_q LS

(LS)
MV =

10.96

41.43

72.50

72.50

0.00

0.00

0.00

0.00

289.71

313.87

411.82

241.37

339.32

241.37

339.32

Horizontal Load
Moments:
Pa
(EH)
F2_q LS
PIR
0.5 PAE

(LS)
(EQ)

Moment
Arm

SERV I

5.32

MIN

MAX

MIN

MAX

EXTREME I
MIN
MAX

13.58

20.37

20.37

20.37

20.37

0.00

0.00

7.99

7.65

13.39

13.39

0.00

0.00

0.00

0.00

7.99

0.00

0.00

0.00

0.00

0.00

4.28

4.28

9.58

0.00

0.00

0.00

0.00

0.00

1.92

1.92

21.23

33.75

33.75

20.37

20.37

6.20

6.20

MH =

334809043.xlsx WORKSHEET_CONSTR

STR I

STR III

Page 84 of 132

t-ft/ft

t-ft/ft

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_CONSTR

ECCENTRICITY:
1

3
MAX
31.63

STR III
MIN
MAX
22.51
31.63

6
7
EXTREME I
MIN
MAX
22.51
31.63

STR I

SERV I

V=
Xo

(t/ft)

23.19

MIN
22.51

(ft)

11.58

12.45

11.95

9.82

10.08

10.45

10.53

eB

(ft)

-0.85

-1.72

-1.22

0.91

0.65

0.28

0.20

(ft)
PERF. RATIO =
CONTROLLING = 1
Check eB eB max:

5.37
6.34
0

5.37
3.13
0

5.37
4.39
0

5.37
5.89
0

5.37
8.29
0

5.37
19.03
0

5.37
26.87
0

OK

OK

OK

OK

OK

OK

OK

eB max

SLIDING:
For Cohesionless soil or rock

R = V * tan

[D10.6.3.4-1]

For Cohesive soil

R = V * tan + ca B'

[D10.6.3.4-3P]

= min [ r, b, (if cont. reinf.) ]

31.0

ca = c (0.21 + 0.27/c) 1.0

0.00
SERV I

STR I

V=
B' =
R =

(t/ft)
(ft)
(t/ft)

23.19
23.15
13.94

MIN
22.51
24.89
13.52

RR =

(t/ft)

13.94

13.52

334809043.xlsx WORKSHEET_CONSTR

deg
tsf

[A11.10.5.3]
[D10.6.3.4-3P, expressed as tons/ft2]

MAX
31.63
23.90
19.01

STR III
MIN
MAX
22.51
31.63
19.64
20.17
13.52
19.01

EXTREME I
MIN
MAX
22.51
31.63
20.90
21.06
13.52
19.01

19.01

13.52

13.52

19.01

Page 85 of 132

19.01

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


H=
(t/ft)
PERF. RATIO =
CONTROLLING = 1
Check RR H:

WORKSHEET_CONSTR

3.51
3.97
0

5.50
2.46
0

5.50
3.45
0

3.83
3.54
0

3.83
4.97
0

0.74
18.36
0

0.74
25.81
0

OK

OK

OK

OK

OK

OK

OK

334809043.xlsx WORKSHEET_CONSTR

Date:
Date:

Page 86 of 132

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_CONSTR

BEARING:
Bearing Capacity Factors:
Nc =
32.67

[C10.6.3.1.2a-2P or 3P (DM-4)]

(Note: For walls adjacent to slopes, the user input N cq term will be used in p

N =

25.99

[C10.6.3.1.2a-4P (DM-4)]

(Note: For walls adjacent to slopes, the user input N q term will be used in p

Nq =
D=
=

20.63
18.97
0.06
90

L > 5B ?

NO

[C10.6.3.1.2a-1P (DM-4)]
[D10.6.3.1.2gP-6]
weighted average of soil unit weight (tons per cubic foot) [D10.6.3.1.2gP]

ft
tcf
deg

(footing is not continuous)

[D10.6.3.1.2a]

V=
Xo =

(t/ft)

26.97

MIN
29.12

MAX
38.25

MIN
22.51

MAX
31.63

EXTREME I
MIN
MAX
22.51
31.63

(ft)

11.49

12.11

11.78

9.82

10.08

10.45

10.53

eB =

(ft)
(ft)

-0.76
22.98

-1.38
24.22

-1.05
23.56

0.91
19.64

0.65
20.17

0.28
20.90

0.20
21.06

SERV I

B' =
sc =

STR I

STR III

1.34

1.35

1.34

1.29

1.30

1.31

1.31

s =

0.79

0.78

0.78

0.82

0.81

0.81

0.80

sq =

1.32

1.34

1.33

1.27

1.28

1.29

1.29

ic =
i =
iq =
n=
qn (soil) =

0.78
0.69

0.69
0.58

0.76
0.66

0.72
0.61

0.80
0.71

0.94
0.91

0.96
0.94

0.79
1.65

0.71
1.64

0.77
1.65

0.73
1.69

0.81
1.68

0.95
1.67

0.96
1.67

21.63

22.60

22.09

19.03

19.44

20.01

20.14

(tsf)

334809043.xlsx WORKSHEET_CONSTR

Page 87 of 132

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

WORKSHEET_CONSTR

qult (soil) =

(tsf)

13.64

11.95

13.34

11.05

12.88

16.56

17.03

qn (rock) =

(tsf)

---

---

---

---

---

---

---

qn =

(tsf)

13.64

11.95

13.34

11.05

12.88

16.56

17.03

(tsf)
q=
(tsf)
PERF. RATIO =
CONTROLLING = 1
Check qR q:

6.14
1.17
5.23
0

5.38
1.20
4.47
0

6.00
1.62
3.70
0

4.97
1.15
4.34
0

5.80
1.57
3.69
0

16.56
1.08
15.37
0

17.03
1.50
11.34
0

OK

OK

OK

OK

OK

OK

OK

qR =

334809043.xlsx WORKSHEET_CONSTR

Date:
Date:

Page 88 of 132

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


INTERNAL STABILITY:

WORKSHEET_CONSTR

(MSE Wall Reinforcement Design)

ka for reinforced soil


S = 0 for horizontal slope
Z2 (Pv), for PV distr. to D1 (Pv) =
Corrosion Loss (Steel Reinforcement):
Loss of galvanizing (First 2 years):
(Subsequent years):
Loss of carbon steel:
Thickness of galvanized coating =
Time to lose galvanized coating =
Remaining service life =
Total loss of carbon steel =

0.283
0.00

[D3.11.5.8.1-4]
[A11.10.6.2.1-2]
Z2 for distribution of PV surcharge for internal stability [A3.11.6.3-1]

ft

2.06

ft

0.58
0.16
0.47
3.40
16.00
84.00
39.48

mil./yr. =
mil./yr. =
mil./yr. =
mils
yrs
yrs
mils =

Strength Reduction (Geosynthetic Reinforcement):


RF = RFID x RFCR x RFD
1.00

Layer
#
1
2
3
4
5
6
---

Depth, Z
(ft)
1.50
3.96
6.42
8.88
11.34
13.80
---

Date:
Date:

Tr

Ec

(in.)
0.16
0.16
0.16
0.16
0.16
0.16
---

(in.)
0.08
0.08
0.08
0.08
0.08
0.08
---

334809043.xlsx WORKSHEET_CONSTR

[A11.10.6.4.2a]
0.00058 in./yr.
0.00016 in./yr.
0.00047 in./yr.

0.03948 in.
[A11.10.6.4.3b]

D*
(in.)
-0.08
-0.08
-0.08
-0.08
-0.08
-0.08
---

Ac (steel)

Ac (geo.)

Ac

Rc

Tal (steel)

(in.2)
0.17
0.17
0.17
0.17
0.17
0.17
---

(in.2)
0.33
0.33
0.33
0.33
0.33
0.33
---

(in.2)
0.17
0.17
0.17
0.17
0.17
0.17
---

ratio
0.067
0.067
0.067
0.067
0.067
0.067
---

(t/ft)
30.25
30.25
30.25
30.25
30.25
30.25
---

Page 89 of 132

Tensile Resistance
Tult (geo.)
Tal (geo.)
(t/ft)
---------------

(t/ft)
---------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

-------------------------------------------------------------

Date:
Date:

WORKSHEET_CONSTR
-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 90 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


---------------------------

---------------------------

---------------------------

---------------------------

REINFORCEMENT STRENGTH:
P =

1.35

Date:
Date:

WORKSHEET_CONSTR
---------------------------

---------------------------

---------------------------

---------------------------

---------------------------

---------------------------

load factor for determining factored horizontal stress, H

[A11.10.6.2.1-1]
Tensile Force for
Geosynthetic Rupture

Max. Tensile Force


Depth, Z
(ft)
1.50
3.96
6.42
8.88
11.34

Sv
(ft)
2.73
2.46
2.46
2.46
2.46

334809043.xlsx WORKSHEET_CONSTR

---------------------------

STR-I, STR-III

STRESSES AND MAX. TENSILE FORCES:

Layer
#
1
2
3
4
5

---------------------------

D1 (Pv)
(ft)
5.75
7.26
8.49
9.72
10.95

kr / ka
coeff.
1.66
1.60
1.54
1.48
1.42

kr
(strength)

0.47
0.45
0.44
0.42
0.40

v
(tsf)
0.21
0.16
0.14
0.12
0.11

Page 91 of 132

v
(tsf)
0.60
0.70
0.82
0.95
1.09

H
(tsf)
0.38
0.43
0.48
0.54
0.59

Tmax
(t/ft)
1.03
1.05
1.19
1.32
1.45

Tmax

Tmax

(static)

(trans.)

(t/ft)
-----------

(t/ft)
-----------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


6
-----------------------------------------------------------

13.80
-----------------------------------------------------------

3.40
-----------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

12.18
-----------------------------------------------------------

Date:
Date:

WORKSHEET_CONSTR
1.36
-----------------------------------------------------------

0.38
-----------------------------------------------------------

0.10
-----------------------------------------------------------

Page 92 of 132

1.23
-----------------------------------------------------------

0.63
-----------------------------------------------------------

2.15
-----------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------

-------------------------------

-------------------------------

-------------------------------

Date:
Date:

WORKSHEET_CONSTR
-------------------------------

-------------------------------

-------------------------------

-------------------------------

-------------------------------

-------------------------------

-------------------------------

-------------------------------

STRENGTH CHECKS:

Layer

Depth, Z

#
1
2
3
4
5
6
---

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
---

Tensile Resistance
Tmax
Check
t Tal Rc
(t/ft)
(t/ft)
1.52
1.03
OK
1.52
1.05
OK
1.52
1.19
OK
1.52
1.32
OK
1.52
1.45
OK
1.52
2.15
NG!
-------

t Tal Rc

334809043.xlsx WORKSHEET_CONSTR

Connection Strength
t Tac Rc [or CC (STR)]
t Tac Rc

Tmax

(t/ft)
5.00
5.00
5.00
5.00
5.00
5.00
---

(t/ft)
1.03
1.05
1.19
1.32
1.45
2.15
---

Page 93 of 132

Geosynthetic Rupture
TSrs

Check
OK
OK
OK
OK
OK
OK
---

(t/ft)
---------------

Static Component
Tmax (static)
Check
(t/ft)
---------------

TSrs
OK
OK
OK
OK
OK
OK
---

Dynamic Compone
TSrt
(t/ft)
---------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

-------------------------------------------------------------

Date:
Date:

WORKSHEET_CONSTR
-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 94 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


---------------------------

---------------------------

---------------------------

334809043.xlsx WORKSHEET_CONSTR

---------------------------

Date:
Date:

WORKSHEET_CONSTR
---------------------------

---------------------------

---------------------------

Page 95 of 132

---------------------------

---------------------------

---------------------------

---------------------------

---------------------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET

Date:
Date:

WORKSHEET_CONSTR

REINFORCEMENT PULLOUT:
Pullout Friction Factor, F*:

[Figure A11.10.6.3.2-1]

Type:
Geotextiles / geogrids

For Z or Zp 20 ft:
0.67 tan r =
0.45

For Z or Zp < 20 ft :
0.67 tanr =
0.45

Ribbed steel strips


Smooth steel strips

tan r =

MIN (1.2 + log Cu, 2.0) - Zp { [MIN (1.2 + log Cu, 2.0) - tan r] / 20

0.40 =
10 (t / St) =

Steel grids
Scale Effect Correction Factor, :
Steel Reinforcements
Geogrids
Geotextiles
=

0.67
0.40

0.40 =
0.40
20 (t / St) - 10 (t / St) (Zp / 20)

0.00

[Table A11.10.6.3.2-1]
1.0
0.8
0.6
1.0
La

Le

Layer

Depth, Z

Zp

Z+S

(active zone)

(eff. length)

F*

kr

v (no LS)

Tmax

#
1
2
3
4
5
6
-----

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-----

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-----

(ft)
1.50
3.96
6.42
8.88
11.34
13.80
-----

(ft)
4.79
4.79
4.79
4.25
2.78
1.30
-----

(ft)
16.21
16.21
16.21
16.75
18.22
19.70
-----

factor
1.72
1.58
1.44
1.30
1.16
1.02
-----

(pullout)

(tsf)
0.42
0.52
0.64
0.77
0.91
1.05
-----

(tsf)
0.26
0.32
0.38
0.44
0.49
0.54
-----

(t/ft)
0.72
0.78
0.93
1.07
1.21
1.84
-----

334809043.xlsx WORKSHEET_CONSTR

Page 96 of 132

0.470
0.453
0.435
0.418
0.400
0.383
-----

v (stress in
resist.zone)

(tsf)
0.23
0.38
0.54
0.69
0.85
1.00
-----

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

-------------------------------------------------------------

Date:
Date:

WORKSHEET_CONSTR
-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 97 of 132

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------

-------------------------

-------------------------

-------------------------

INTERNAL SEISMIC CHECKS:

Date:
Date:

WORKSHEET_CONSTR
-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

-------------------------

EXT-I

Am =

0.07

Wa =

3.44

EQ =

1.00

Pi =

0.24

tons/ft

Le =

103.3

ft

tons/ft

TENSILE STRENGTH

PULLOUT RESISTANCE
Geosynthetic Rupture

Layer

Depth, Z

Tmd

H (strength)

Tmax

Ttotal

t Tal Rc

#
1
2

(ft)
1.50
3.96

(t/ft)
0.038
0.038

(tsf)
0.26
0.32

(t/ft)
0.72
0.78

(t/ft)
0.76
0.82

(t/ft)
2.03
2.03

334809043.xlsx WORKSHEET_CONSTR

Page 98 of 132

Check
t Tal Rc
OK
OK

Static
TSrs > Tmax

Dynamic
TSrt > Tmd

-----

-----

v (no LS)

H (pullout)

(tsf)
0.42
0.52

(tsf)
0.26
0.32

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


3
4
5
6
-----------------------------------------------------

6.42
8.88
11.34
13.80
-----------------------------------------------------

0.038
0.039
0.043
0.046
-----------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

0.38
0.44
0.49
0.54
-----------------------------------------------------

Date:
Date:

WORKSHEET_CONSTR
0.93
1.07
1.21
1.84
-----------------------------------------------------

0.97
1.11
1.25
1.88
-----------------------------------------------------

2.03
2.03
2.03
2.03
-----------------------------------------------------

Page 99 of 132

OK
OK
OK
OK
-----------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

0.64
0.77
0.91
1.05
-----------------------------------------------------

0.38
0.44
0.49
0.54
-----------------------------------------------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

Date:
Date:

WORKSHEET_CONSTR
-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

-------------------------------------

SEISMIC CONNECTION CHECKS:


Steel Reinforcements

Geosynthetic Reinforcements:

Layer

Depth, Z

Ttotal

CC (EXT)

Check

#
1
2
3

(ft)
1.50
3.96
6.42

(t/ft)
0.76
0.82
0.97

(t/ft)
6.00
6.00
6.00

CC (EXT)
OK
OK
OK

334809043.xlsx WORKSHEET_CONSTR

Long-Term Strength
Ttotal
Tult
(t/ft)
0.76
0.82
0.97

(t/ft)
-------

Page 100 of 132

t Tac Rc
(t/ft)
-------

Geosynthetic Connection Streng


Check
t Tac Rc
-------

Static Component
Tmax
TSrs (static)
(t/ft)
0.72
0.78
0.93

(t/ft)
-------

Check
TSrs
-------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


4
5
6
-------------------------------------------------------

8.88
11.34
13.80
-------------------------------------------------------

1.11
1.25
1.88
-------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

6.00
6.00
6.00
-------------------------------------------------------

Date:
Date:

WORKSHEET_CONSTR
OK
OK
OK
-------------------------------------------------------

1.11
1.25
1.88
-------------------------------------------------------

-------------------------------------------------------------

Page 101 of 132

-------------------------------------------------------------

-------------------------------------------------------------

1.07
1.21
1.84
-------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

10/26/2016 14:39:57

Title: Test Run

By:
Chk'd:

MSE WALL DESIGN SPREADSHEET


-----------------------------------

-----------------------------------

-----------------------------------

334809043.xlsx WORKSHEET_CONSTR

-----------------------------------

Date:
Date:

WORKSHEET_CONSTR
-----------------------------------

-----------------------------------

-----------------------------------

Page 102 of 132

-----------------------------------

-----------------------------------

-----------------------------------

-----------------------------------

-----------------------------------

10/26/2016 14:39:57

esign earth pressure [D3.11.5.5]:


>

0.035

ksf/ft ---->

OK

334809043.xlsx WORKSHEET_CONSTR

Page 103 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_CONSTR

Page 104 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_CONSTR

Page 105 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_CONSTR

Page 106 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_CONSTR

Page 107 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_CONSTR

Page 108 of 132

10/26/2016 14:39:57

ut N cq term will be used in place of Nc shown here.)

ut N q term will be used in place of N shown here.)

334809043.xlsx WORKSHEET_CONSTR

Page 109 of 132

10/26/2016 14:39:57

334809043.xlsx WORKSHEET_CONSTR

Page 110 of 132

10/26/2016 14:39:57

esistance
t Tal Rc
(t/ft)
1.52
1.52
1.52
1.52
1.52
1.52
---

Connection Strength
Tac (geo.)
t Tac Rc
CC (STR)
(t/ft)
---------------

(t/ft)
---------------

(t/ft)
5.00
5.00
5.00
5.00
5.00
5.00
---

334809043.xlsx WORKSHEET_CONSTR

Geosynthetic Rupture
Resistance
TSrs (static) TSrt (trans.)
(t/ft)
---------------

(t/ft)
---------------

Page 111 of 132

10/26/2016 14:39:57

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

-------------------------------------------------------------

-------------------------------------------------------------

Page 112 of 132

10/26/2016 14:39:57

---------------------------

---------------------------

---------------------------

---------------------------

---------------------------

---------------------------

Vertical stress (no LS)


(for pullout & seismic)
v
(no LS)

(tsf)
0.42
0.52
0.64
0.77
0.91

334809043.xlsx WORKSHEET_CONSTR

Page 113 of 132

10/26/2016 14:39:57

1.05
-----------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

Page 114 of 132

10/26/2016 14:39:57

-------------------------------

tic Rupture
Dynamic Component
Tmax (trans.)
Check
(t/ft)
---------------

TSrt
OK
OK
OK
OK
OK
OK
---

334809043.xlsx WORKSHEET_CONSTR

Page 115 of 132

10/26/2016 14:39:57

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

Page 116 of 132

10/26/2016 14:39:57

---------------------------

---------------------------

334809043.xlsx WORKSHEET_CONSTR

Page 117 of 132

10/26/2016 14:39:57

0) - tan r] / 20 }

Effective Length Check


Req'd
Le
(ft)
15.35
10.71
9.96
9.86
10.12
14.81
-----

Add'l Le
Check
Le
OK
OK
OK
OK
OK
OK
-----

Needed

Use
Lreinf

(ft)
-----------------

(ft)
21.00
21.00
21.00
21.00
21.00
21.00
-----

334809043.xlsx WORKSHEET_CONSTR

Check Overlap Length of Geosynthetic Facing:


Loverlap
Le req'd for
F*

(input)

Tmax (STR)

(overlap)
-----------------

(ft)
-----------------

(ft)
-----------------

Page 118 of 132

10/26/2016 14:39:58

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

Page 119 of 132

10/26/2016 14:39:58

-------------------------

-------------------------

-------------------------

-------------------------

v (stress in
resist.zone)

Req'd
Le (EXT-I)

(tsf)
0.23
0.38

(ft)
15.14
10.53

-------------------------

-------------------------

-------------------------

RESISTANCE
Tmax

Ttotal

(t/ft)
0.72
0.78

(t/ft)
0.76
0.82

334809043.xlsx WORKSHEET_CONSTR

Check
Le
OK
OK

Page 120 of 132

10/26/2016 14:39:58

0.93
1.07
1.21
1.84
-----------------------------------------------------

0.97
1.11
1.25
1.88
-----------------------------------------------------

0.54
0.69
0.85
1.00
-----------------------------------------------------

9.71
9.58
9.82
14.23
-----------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

OK
OK
OK
OK
-----------------------------------------------------

Page 121 of 132

10/26/2016 14:39:58

-------------------------------------

-------------------------------------

-------------------------------------

synthetic Connection Strength


Dynamic Component
Tmd
TSrt (trans)
(t/ft)
0.038
0.038
0.038

(t/ft)
-------

-------------------------------------

-------------------------------------

Overlap Length of Geosynthetic Facing:


Loverlap
Le req'd for
Check
Check
TSrt
-------

(input)

Ttotal (pullout)

Loverlap

(ft)
-------

(ft)
-------

(input)

334809043.xlsx WORKSHEET_CONSTR

-------

Page 122 of 132

10/26/2016 14:39:58

0.039
0.043
0.046
-------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

-------------------------------------------------------------

334809043.xlsx WORKSHEET_CONSTR

-------------------------------------------------------------

-------------------------------------------------------------

Page 123 of 132

10/26/2016 14:39:58

-----------------------------------

-----------------------------------

-----------------------------------

-----------------------------------

334809043.xlsx WORKSHEET_CONSTR

-----------------------------------

-----------------------------------

Page 124 of 132

10/26/2016 14:39:58

Title: Test Run

By:
Chk'd:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

OUTPUT

SUMMARY OF DESIGN RESULTS


# of Input Warnings/Errors = 1

External Stability
Type of Stability Check:
Overturning (Eccentricity):
Sliding:
Bearing:

eB =

3.55

ft

eB max =
H=
RR =

5.37
11.60

ft
t/ft

15.96
1.91

t/ft
t/ft2

2.31

t/ft2

q=
qR =

Load Case

Perf. Ratio

STR-I MIN

1.51

STR-I MIN

1.38

STR-I MIN

1.21

Internal Stability for Metallic Reinforcement


Type of Stability Check:
Tensile Resistance:
Connection Strength:
Pullout Resistance:
Tensile Resistance:
(Seismic)
Connection Strength:
(Seismic)
Pullout Resistance:
(Seismic)

Location
Tmax =

1.97

t/ft

t Tal Rc =

1.02

t/ft

Tmax =
CC (STR or EXT) =
Le req'd =

2.42
5.00

t/ft
t/ft

15.35

ft

Le =

16.21

ft

Ttotal =

2.24

t/ft

t Tal Rc =

2.03

t/ft

Ttotal =
CC (EXT) =
Le req'd =

2.24
6.00

t/ft
t/ft

15.14

ft

Le =

16.21

ft

Perf. Ratio

LAYER # 6

0.52

LAYER # 6

2.07

LAYER # 1

1.06

LAYER # 6

0.91

LAYER # 6

2.68

LAYER # 1

1.07

Internal Stability for Geosynthetic Reinforcement


Type of Stability Check:
Tensile Resistance:
Tensile Resistance (Static):
Tensile Resistance (Transient):

Tmax =

---

t/ft

t Tal Rc =

---

t/ft

Tmax (static) =

---

t/ft

SrsRc/RF =

---

t/ft

Tmax (transient) =

---

t/ft

---

t/ft

SrtRc/(RFID*RFD) =
Connection Strength:
Wall Facing (Overlap):

334809043.xlsx OUTPUT

Tmax =

---

t/ft

t Tac Rc =

---

t/ft

Loverlap req'd =

---

ft

Loverlap =

---

ft

Page 125 of 132

Location

Perf. Ratio

---

---

---

---

---

---

---

---

---

---

10/26/2016 14:39:58

Title: Test Run

By:
Chk'd:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

OUTPUT

SUMMARY OF DESIGN RESULTS


Pullout Resistance:

# of Input Warnings/Errors = 1
Le req'd =
--ft
Le =
--ft

Tensile Resistance:

Ttotal =

---

t/ft

t Tal Rc =

---

t/ft

Tmax =

---

t/ft

SrsRc/RF =

---

t/ft

Tmd =

---

t/ft

---

t/ft

Ttotal =

---

t/ft

t Tac Rc =

---

t/ft

Tmax =

---

t/ft

SrsCRcrRc/RFD =

---

t/ft

Tmd =

---

t/ft

SrtCRuRc/RFD =

---

t/ft

Loverlap req'd =

---

ft

Loverlap =

---

ft

Le req'd =

---

ft

Le =

---

ft

(Seismic)
Tensile Resistance (Static):
(Seismic)
Tensile Resistance (Dynamic):
(Seismic)
Connection Strength:
(Seismic)
Connection Strength (Static):
(Seismic)
Connection Strength (Dynamic):
(Seismic)
Wall Facing (Overlap):
(Seismic)
Pullout Resistance:
(Seismic)

334809043.xlsx OUTPUT

SrtRc/(RFID*RFD) =

Page 126 of 132

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

10/26/2016 14:39:58

Title: Test Run

By:
Chk'd:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

OUTPUT

SUMMARY OF DESIGN RESULTS


# of Input Warnings/Errors = 1

Internal Stability for Abutment (Metallic Reinforcement)


Type of Stability Check:
Tensile Resistance:
Connection Strength:
Pullout Resistance:
Tensile Resistance:
(Seismic)
Connection Strength:
(Seismic)
Pullout Resistance:
(Seismic)

Tmax =

0.77

t/ft

t Tal Rc =

1.52

t/ft

Tmax =

0.77
5.00

t/ft
t/ft

CC (STR) =
Le req'd =

7.86

ft

Le =

13.87

ft

Ttotal =

0.67

t/ft

t Tal Rc =

2.03

t/ft

Ttotal =
CC (EXT) =
Le req'd =

0.67
6.00

t/ft
t/ft

7.59

ft

Le =

13.87

ft

Location

Perf. Ratio

LAYER # 3

1.97

LAYER # 3

6.47

LAYER # 1

1.76

LAYER # 3

3.02

LAYER # 3

8.90

LAYER # 1

1.83

Internal Stability for Abutment (Geosynthetic Reinforcement)


Type of Stability Check:
Tensile Resistance:
Tensile Resistance (Static):
Tensile Resistance (Transient):

Tmax = Err:509
t Tal Rc = Err:509

Pullout Resistance:
Tensile Resistance:
(Seismic)
Tensile Resistance (Static):
(Seismic)
Tensile Resistance (Dynamic):
(Seismic)
Connection Strength:
(Seismic)

334809043.xlsx OUTPUT

t/ft

Tmax (static) =

---

t/ft

SrsRc/RF =

---

t/ft

Tmax (transient) =

---

t/ft

---

t/ft

Tmax =

---

t/ft

t Tac Rc =

---

t/ft

Le req'd =

---

ft

Le =

---

ft

Ttotal =

---

t/ft

t Tal Rc =

---

t/ft

Tmax =

---

t/ft

SrsRc/RF =

---

t/ft

Tmd =

---

t/ft

---

t/ft

Ttotal =

---

t/ft

t Tac Rc =

---

t/ft

SrtRc/(RFID*RFD) =
Connection Strength:

t/ft

SrtRc/(RFID*RFD) =

Page 127 of 132

Location

Perf. Ratio

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

---

10/26/2016 14:39:58

Title: Test Run

By:
Chk'd:

Date:
Date:

MSE WALL DESIGN SPREADSHEET

OUTPUT

SUMMARY OF DESIGN RESULTS


Connection Strength (Static):
(Seismic)
Connection Strength (Dynamic):
(Seismic)
Pullout Resistance:
(Seismic)

334809043.xlsx OUTPUT

# of Input Warnings/Errors = 1
Tmax =
--t/ft
SrsCRcrRc/RFD =
--t/ft
Tmd =

---

t/ft

SrtCRuRc/RFD =

---

t/ft

Le req'd =

---

ft

Le =

---

ft

Page 128 of 132

---

---

---

---

---

---

10/26/2016 14:39:58

OUTPUT

OK ?
OK
OK
OK

OK ?
NG!
OK
OK
NG!
OK
OK

nt
OK ?
-----------

334809043.xlsx OUTPUT

Page 129 of 132

10/26/2016 14:39:58

OUTPUT

-------------------

334809043.xlsx OUTPUT

Page 130 of 132

10/26/2016 14:39:58

OUTPUT

ment)
OK ?
OK
OK
OK
OK
OK
OK

cement)
OK ?
-------------------

334809043.xlsx OUTPUT

Page 131 of 132

10/26/2016 14:39:58

OUTPUT

-------

334809043.xlsx OUTPUT

Page 132 of 132

10/26/2016 14:39:58

S-ar putea să vă placă și