Unit
Hydropower plant
Plant Capacity
MW
1000
1000
Per MW Cost
Mill USD/MW
1.78
Mill USD
2000
1781
45
85
Gross Generation
GWh
3942
7446
Net Generation
GWh
3922
6776
0.5
9.0
Fuel Cost
Mill USD/Year
151.2
O & M Cost
Mill USD/Year
14.3
27.8
Days/Year
46-67
86
Months
61
44
Years
> 35
< 25
0.03
Dr. USD/kWh
Ir. Aries Firman MSc, MBA, June 2016
0.05
Auxiliary Consumption
ENERGY TRILEMMA
ENERGY SECURITY :
The effective management of primary
energy supply from domestic and external
sources, the reliability of energy infrastructure
and the energy providers to meet current and
future demand
ENERGY SECURITY
ENERGY EQUITY
Accessability and affordability of
energy supply across the population
ENVIRONMENTAL SUSTAINABILITY
Encompasses the achievement of supply
and demand side energy efficiencies and
the development of energy supply from
renewables and other low carbon sources
ENERGY EQUITY
ET
ENVIRONMENTAL
SUSTAINABILITY
Sources : PLN and
World Energy Council
5
3. NORWAY
11. NETHERLAND
12. USA
21. MALAYSIA
23. SINGAPORE
50. PHILIPINA
65. INDONESIA
74. CHINA
107. INDIA
129. SENEGAL
130. BENIN
A
B
C
D
SCORE
OF
RANK
RANK OF
ENERGY
SECURITY
RANK OF
ENERGY
EQUITY
RANK OF
ENVIRONMENTAL
SUSTAINABILITY
AAA
AAB
BBB
AAC
AAC
ABD
BBC
ACC
ACD
BDD
DDD
DDD
10
33
31
3
19
120
52
17
21
53
127
128
5
18
36
1
24
15
92
88
78
103
112
117
1
6
46
95
76
25
35
75
129
122
106
109
North Sumatera
1. Renun HEPP (82 MW)
2. Sipansipahoras HEPP (50 MW)
North Sulawesi
Riau
West Sumatera
Central Sulawesi
Bengkulu
1. Lebong HEPP (12 MW)
Bengkulu
1. Musi HEPP (215.52 MW)
2. Tes HEPP (17.64 MW)
South Kalimantan
1. Riam Kanan HEPP (20
MW)
South Sulawesi
1. Bakaru I HEPP (126 MW)
2. Bili-Bili HEPP (20 MW)
Lampung
1. BatuTegi HEPP(29.6 MW)
2. Besai HEPP (92.8 MW)
West Java
1. Djatiluhur HEPP (150 MW)
West Java
1. Cikalong HEPP (19.2 MW)
2. Cirata HEPP (1,008 MW)
3. Kracak HEPP (18.9 MW)
4. Lamajang HEPP (19.6 MW)
5. Saguling HEPP (700.2 MW)
6. Ubrug HEPP (18.36 MW)
Central Java
1. Garung HEPP (26.4 MW)
2. Jelok HEPP (20.5 MW)
3. Kedung Ombo HEPP (22.5 MW)
4. Sudirman HEPP (181 MW)
5. Timo HEPP (12 MW)
6. Tulungagung HEPP (36 MW)
7. Wadas Lintang HEPP (18 MW)
8. Wonogiri HEPP (12 MW)
East Java
1. Mendalan HEPP (23 MW)
2. Sengguruh HEPP (29 MW)
3. Siman HEPP (10.8 MW)
4. Sutami HEPP (105 MW)
5. Wlingi HEPP (54 MW)
: PLN
: IPP
14
PAPUA
49 MW
SUMATERA
4.408,4 MW
JAWA
4.594,5 MW
NUSA TENGGARA
15 MW
Dr. Ir. Aries Firman MSc, MBA, June 2016
13
Aceh (NAD)
1. Peusangan 1&2 HEPP (87 MW)
Aceh (NAD)
1. Peusangan-4 HEPP (83 MW)
2. Meurebo-2 HEPP (59 MW)
3. Redelong HEPP (18 MW)
North Sumatera
1. Simonggo-2 HEPP (90 MW)
2. Asahan III HEPP (174 MW)
3. Kumbih-3 HEPP (48 MW)
4. Sumatera Pumped Storage
HEPP (1000 MW)
North Sumatera
West Sumatera
1. Masang-2 HEPP (55 MW)
2. Masang-3 HEPP (89 MW)
Bengkulu
1. Ketahun-1 HEPP (84 MW)
Bengkulu
Jambi
1. Merangin HEPP (350 MW)
Lampung
1. Semangka HEPP (56 MW)
West Kalimantan
1. Baliem HEPP (50 MW)
2. Genyem HEPP (20 MW)
3. Orya-2 HEPP (10 MW)
East Kalimantan
1. Kelai HEPP (55 MW)
South Kalimantan
North Sulawesi
North Sulawesi
West Sulawesi
West Sulawesi
Central Sulawesi
1. Poso-1 HEPP (120 MW)
South Sulawesi
1. Bakaru II HEPP (126 MW)
Moluccu
1. Tala HEPP (27 MW)
Southeast Sulawesi
1. Konawe HEPP (50 MW)
2. Wotunohu HEPP (15 MW)
South Sulawesi
1. Bonto Batu HEPP (110 MW)
2. Malea HEPP (90 MW)
3. Salu Uro HEPP (96 MW)
4. Kalaena HEPP (54 MW)
5. Seko HEPP (480 MW)
6. Buttu Batu HEPP (200 MW)
7. Paleleng HEPP (40 MW)
Southeast Sulawesi
West Java
1. Upper Cisokan Pumped Storage
HEPP (1,040 MW)
2. Jatigede HEPP (110 MW)
West Java
NTT
Central Java
Source : RUPTL 2015-2024
West Papua
1. Matenggeng Pumped
StorageHEPP (900 MW)
Papua
East Java
1. Karangkates IV&V HEPP (100 MW)
2. Kesamben HEPP (37 MW)
NTB
16
Hydropower Under Construction (1,565.4MW), PPA Negotiation with IPP (1.779 MW)
& Under Study/Design & Procurement (2,131 MW)
ACEH ( 86.4 MW )
ACEH( 144 MW )
WEST SUMATERA ( 52 MW )
PAPUA( 56.5 MW )
NORTH SUMATERA ( 90 MW )
MOLUCCU ( 54 MW )
PAPUA ( 70 MW )
1. MALEA (90MW)
2. BONTOBATU (100 MW)
3. KARAMA ( 450 MW )
KALIMANTAN ( 313 MW )
1. KUSAN (65 MW)
2. NANGA PINOH (98 MW)
3. KELAI (150 MW)
JAMBI ( 350 MW )
JAVA( 1,094 MW )
SULAWESI ( 437 MW )
1. SAWANGAN (12 MW)
2. BAKARU II (126 MW)
3. POKO (234 MW)
4. KONAWE-1 (50 MW)
5. WATUNOHU (15 MW)
LAMPUNG( 56MW )
1. SEMANGKA(56MW)
WEST JAVA( 40 MW )
1. RAJAMANDALA (40 MW)
UNDER
CONSTRUCTION
PPA NEGOTIATION
STUDY / DESIGN
/PROCUREMENT
17
10
DISADVANTAGES
11
19
Plant name
year
Capacity (MW)
1
2
3
Itaipu
Gabcikovo- Nagymaros
Three Gorges
1984-1991
12,600
1977
880
1993 - 2000 18,200
12
13
ADVANTAGES
DISADVANTAGES
14
20
DISADVANTAGES
15
21
INTEGRATIVE ASPECTS ( demonstrated need and strategic fit, communications and consultations,governance,integrated project management ,
environmental and social issues management, etc)
*) Reff : IHA Hydropower Sustainability Assesment Protocol .
16
23
17
30
Thank You
18