Summary
Cost : RM 46,953,928.60
Category
Maximum
Silver
Gold
Energy Efficiency
35
26
25
21
16
19
16
12
13
11
Water Efficiency
10
Innovation
100
75
79
Total
Land area
6.33 acre
Building plinth
16 m
12,480.81 m2
295 lot
4,435.67 m2
738.675 m2
SPECIFICATION
External wall color
External wall construction
Roof
Glazing
SENDAYAN CLUBHOUSE
LOCATION
ARTIST IMPRESSION
ENERGY
EFFICIENCY [EE]
[EE1]Minimum EE Performance
[EE2] Lighting Zoning
[EE3] Electrical Sub-Metering
[EE4] Renewable Energy
[EE5] Advanced EE Performance - BEI
[EE6] Enhanced Re-Commisioning
[EE7] On-Going Post Occupancy Commisioning
[EE8] EE Monitoring and Improvement
[EE9] Sustainable Maintenance
Credit
Maximum
Target
Silver
Cost (RM)
Design
1
Minimum EE Performance
*Incorparate with
EE 5
Ligthing Zoning
307,000
Electrical Sub-Metering
Renewable Energy
367,200
15
2,248,506.00
187,815.70
*EE 8
Commissioning
Enhance Commissioning
Post-Occupancy
Commissioning
EE Verification
62,000
Sustainable Maintanance
31,500
35
26
25
3,229,206.00
Subtotal
Maximum
1
Target
Achieve
1
= 4435.67
m2
= 738.675
m2
OTTV
= 37.80
W/m2
= 1,319.81
m2
RTTV
Total RC Slab Area
m2
RTTV
W/m2
= 8.8
MATERIAL SPECIFICATION
Type
U-Value (W/m2)
Shading
Coefficient
Price (RM)
Lightweight Wall
1.383
N/A
187,474.87
Pilkington Monolith
Glass
3.8
0.52
23,769.41
Pilkington Double
Glaze
0.4
53,939.20
RC Slab Roof
1.057
N/A
353,191.30
Aluminum Deck
0.235
N/A
253,551.48
Total Cost
870,926
EE 2: LIGHTING ZONING
Zoning area are propose for an area not exceeding
Target
Achieve
DUS804C-DALI
Ceiling Mount
Sensor
CONTROLLER/GETAWAY
Use to sync all Dali program
device to one control system.
Controller are use to give a
control for the pre program
lighting.
INSTALLATION COST
EE 3: ELECTRICAL SUB-METERING
Achieved 1 point for EE:
Provide sub-metering where energy use 100kVA.
Separate sub-metering for lighting and separate for power at
each floor or tenancy.
Installed at strategic load centers to monitor energy
consumption.
Cost will be include in EE8(Verification)
Maximum
1
Target
Achieve
1
Locations of submeter:Total submeters are 38 nos that divide to the function :a) Central air-conditioning system 1 no.
b) Lifts and escalators 1 nos
c) Major water pumping and rainwater system 2 nos
f) Carpark 1 no.
g) MV 2nos
EE 4: RENEWABLE ENERGY
TBEC
= 1,664,129.432 kWh/year
To get 5 point;
2% renewable power generated from TBEC must be
achieve =
33,282.58 kWh/year
Target
Achieve
4
Propose Design
Assuming
8m2/kWp
space
The
construction
price
estimated at RM 367,200.
is
PV SPECIFICATION
EE 5 ADVANCE EE PERFORMANCE
Sendayan BEI = 124.02 kWh/m2/year
Club House is divided into 5 section area:
Recreational
Non Recreational
Kitchen and Restaurant
Shop and Retail
Functional Room
Maximum
15
Target
Achieve
8
ACTION PLAN
i.
Installation of wall material, light weight material is use for lower u-Value.
ii.
All the window is monolith tinted window and glass panel is double glaze tinted.
iii.
The arc is shade by honey comb shading in order to get lower shading coefficient.
iv.
Installation of solar thermal for hot water use in sauna and spa
v.
TOTAL COST
Item
Costs
Amount
(RM)
(a)
870,926.26
(b)
500,000
(c)
10,380.00
(c)
50,000.00
(d)
367,200
(e)
450,000
TOTAL
2,248,506.00
EE 6 ENHANCE COMMISSIONING
Appoint the Commissioning Specialist approved by
GBI.
Commissioning is performed for all the building's
energy related systems in accordance with
ASHRAE Commissioning Guideline or other GBI
approved equivalent standards.
Maximum
3
Target
Achieve
3
commissioning to meet
the GBI standards for the
building.
Target
Achieve
EE 8 EE VERIFICATION
Achive 2 points for EE:
Target
Achieve
2
EE 9 SUSTAINABLE MAINTENANCE
Maintenance team must be on board 3 month before the
Target
Achieve
3
MAINTENANCE ROOM
TOTAL COST
Item
Additional costs
(a)
(b)
TOTAL
Amount
(RM)
31,500
31,500
INDOOR
ENVIRONMENTAL QUALITY
[EQ]
[EQ1] Minimum IAQ Performance
[EQ2] Environmental Tobacco Smoke (ETS) Control
[EQ3] Carbon Dioxide Monitoring and Control
[EQ4] Indoor Air Pollutants
[EQ5] Mould Prevention
[EQ6] Thermal Comfort: Design & Controllability of
Systems
[EQ7] Air Change Effectiveness
[EQ8] Daylighting
[EQ9] Daylight Glare Control
[EQ10] Electric Lighting Levels
[EQ11] High Frequency Ballasts
[EQ12] External Views
[EQ13] Internal Noise Levels
[EQ14] IAQ Before & During Occupancy
[EQ15] Post Occupancy Comfort Survey: Verification
IEQ SUMMARY
EQ
Credits
Maximum
Baseline
MS1525
Silver
Cost (RM)
Environmental Tobacco
Smoke (ETS) Control
1,500
42,000
45,000
Mould Prevention
Day lighting
30,000
200,000
10
320,000
11
400,000
12
External Views
-*
13
500,000
14
-*
15
-*
-*
-*
38,000
Area sq.m
No. of
Person
CFM/sq.ft
CFM
/Person
CFM
(sq.ft)
CFM
(Person)
CFM
(Total)
GF
6653.94
250
0.06
399.24
1250
1649.24
LG1
4530.53
100
0.06
271.83
500
771.83
LG2
1830.84
50
0.06
109.85
112.85
Cost (RM)
ETS CONTROL
Smoking shall be prohibited within the building
Enforced through No smoking signage
Designated area 10m away from building
Cost (RM)
1,500
Cost (RM)
42,000
Cost (RM)
45,000
MOLD PREVENTION
Cost (RM)
THERMAL COMFORT
DESIGN & CONTROLLABILITY OF SYSTEMS
Cost (RM)
38,000
THERMAL COMFORT
DESIGN & CONTROLLABILITY OF SYSTEMS
Cost (RM)
38,000
Cost (RM)
DAYLIGHTING
The simplest form of description of the daylight distribution, penetration and
intensity is the Daylight Factor (DF), expressed as a percentage. This is the ratio of
the glazing area to the floor area on a horizontal surface.
DF = 0.1 x P
where:
DF = Daylight factor
P = Percentage glazing to floor area
DF (%)
Lighting
Glare
Thermal Comfort
> 6.0
Intolerable
Intolerable
Uncomfortable
3.5 6.0
Tolerable
Uncomfortable
Tolerable
1.0 3.5
Acceptable
Acceptable
Acceptable
< 1.0
Perceptible
Imperceptible
Acceptable
(Source: MS1525:2007)
Cost (RM)
DAYLIGHTING
Division
Daylight Factor
Status
(%)
North
649.132
131.168
2.02
Achieve
North-East
388.612
145.388
3.74
Not Achieve
East
210.543
Not Achieve
South-East
623.937
156.983
2.51
Achieve
South
899.018
118.086
1.31
Achieve
South-West
316.968
97.480
3.07
Achieve
West
383.810
26.262
0.68
Not Achieve
North-West
435.520
63.308
1.46
Achieve
From the status results, it shows that the total NLA is achieve 62.5% out of 100% and it will
be granted 2 points in this EQ8 where the requirements is to have more or equal than 50%
of daylight factor in the range of 1%-3.5% of the building.
Cost (RM)
Cost (RM)
200 000
Cost (RM)
200 000
ILLUMINANCE (LUX)
Carpark
100
Stairs
100
100
100
Reading room
200
300 400
200
Kitchen
150 300
Toilet
100
(Source: MS1525:2007)
Cost (RM)
320,000
ILLUMINANCE (LUX)
Billiard/snooker rooms
150
Swimming pools
200
200
Gymnasium
300
Badminton courts
300
(Source: Panduan Teknik JKR)
Cost (RM)
320,000
Specifications:
Dimmable
Energy Efficiency Label
(EEL) = A
Luminous flux = 1200Lm
Colour Rendering Index
(CRI) = 82 Ra
Lamp wattage: 18W
Cost (RM)
320,000
Cost (RM)
320,000
Benefits:
Compact and
lightweight
With Digital
Addressable Lighting
Interface (DALI)
protocol [energy-saving
+ control system]
Flicker-free warm start
Smart power: a-control
(Source: Philips Lighting Malaysia)
Cost (RM)
400,000
INTERNAL VIEWS
This requirement is can not be fulfil due to the architect factor which is the
percentage of total glazing area and total of wall area is very low due to the ecstatic
value. The wall area is full of concrete material in comparable to the glazing for the
internal views.
Given the total glazing area is: 738.675
Given the total wall area is: 3696.997
Therefore: (total glazing area divided by total area) x 100
738.675 / 3696.997
= 20% (not achieved the requirement)
Cost (RM)
Characteristics:
Consists of a piece of
Medium Density Fibre
(MDF) board with
perfororated design
covering an acoustic
treatment eg. Rockwool
Good low frequency
absorption
Water and fire proof
(Source: KW-JWEE Marketing Sdn Bhd)
Cost (RM)
500,000
Cost (RM)
Cost (RM)
SUSTAINABLE SITE
PLANNING & MANAGEMENT [SM]
[SM1] Site Selection
[SM2] Brownfield Redevelopment
[SM3] Development Density &
Community Connectivity
[SM4] Environment Management
[SM5] Earthworks
[SM6] QLASSIC
[SM7] Workers Amenities
[SM8] Public Transportation Access
[SM9] Green Vehicle Priority
[SM10] Parking Capacity
[SM11] Stormwater Design
[SM12] Greenery & Roof
[SM13] Building User Manual
Credit
Maximum
Baseline
MS 1525
Silver
Cost (RM)
Site Selection
-*
Brownfield Redevelopment
-*
-*
Environment Management
-*
-*
-*
Construction Work
7
Workers Amenities
60,000
30,000
1,500
10
Parking Capacity
1,500
11
12
40,000
13
5,000
16
10
13
138,000
Subtotal
SITE SELECTION
Bandar Sri Sendayan (BSS) is
strategically located within the
Greater Klang Valley.
Site Plan
Design Requirement for the DA is by showing Survey plan and Site Plan footprint of building
and its setback dimensions in relationship to existing natural features such as lakes, rivers,
streams, tributaries, beaches.
Nil
BROWNFIELD
REDEVELOPMENT
Felda land schemes for Sendayang located on 2,000 hectares in
Negeri Sembilan about 15 km from Seremban. This area was first
explored in 1963 by 40 settlers under the supervision of the
Federal Land Development Authority (FELDA).
Felda Sendayang will be developed into a new city called Bandar
Sri Sendayang
As for GBI, SM2 is to rehabilitate damaged site where
development is complicated by environmental contamination e.g.
rubbish dump area, ex mining land.
Nil
Community
connectivity
surrounding
the proposed
development.
Nil
ENVIRONMENT MANAGEMENT
Conservation :
ENVIRONMENT MANAGEMENT
Open Space
Seremban open space
requirement for the site is 10%. The
project has achieved a 38%
improvement on this requirement.
Examples of primary
principal species
appropriate
ENVIRONMENT MANAGEMENT
Items
Location
Type
Area (m)
Eto
Kc
High
1 Lower Gnd
Landscape
Flowers
3 Lower Gnd
Landscape
Average
Low
High
Average
Low
30
0.006
0.8
0.75
0.6
0.144
0.135
0.108
Turf grass
235
0.006
0.8
0.75
0.6
1.128
1.0575
0.846
4 Lower Gnd
Landscape
215
0.006
0.9
0.5
0.2
1.161
0.645
0.258
5 Ground
Landscape
Trees
105
0.006
0.9
0.5
0.2
0.567
0.315
0.126
6 Ground
Landscape
Schrubs
52
0.006
0.7
0.5
0.2
0.2184
0.156
0.0624
7 Ground
Landscape
Turfgrass/Flowers
42
0.006
0.8
0.75
0.6
0.2016
0.189
0.1512
8 Ground
Landscape
985
0.006
0.9
0.5
0.2
5.319
2.955
1.182
8.739
5.4525
2.7336
Total
1664
Table 4.3:
List ofPoint
Plants
Levels.
GBI Name
Maximum
: 2and Characteristic by Additional
Cost (RM)
Nil
WORKERS AMENITIES
Create and implement a Site
Amenities Plan for all construction
workers associated with the project.
Among steps to be taken are as the
followings:
To provide proper housing,
canteen / kitchen area, bathroom and
toilet facilities,
canteen /
kitchen area
60,000
30,000
1,500
PARKING CAPACITY
1,500
Roof Application:
To finish with white-colour weather resistant
paint and the cooling tower (SRI value is 100,
which is MORE than the required value of 78).
Description
Characteristic
JAPANESE STEWARTIA
This all season performer begins with silky
brown, camellia-like white blossoms open
from pearl-like buds. The three will turning
from apple green to reddish-purple. Plant
under power lines as a streetside tree or in
shrub borders or lowns.
AZALEA
Small Shrub
Dwarf and Exburry hybrids offer spring blooms
as well as good fall colour. Locate plants where
they will receive filtered light and wind
protection. Acid soil and excellent drainage.
Medium Shrub
Among the most loved flowering shrub, hardy
deciduous azaleas vary in firm and colour.
They are useful in beds, as foundation plants,
as accents, or below spreading trees. Some are
fragrant. All need good humidity, full son or
partial shade, and moist, acid soil
FORGET-ME-NOT
M. scorpioides is a perennial; M. sylvatica selfsows. Both have pale blue flower with pink,
yellow, or white centers in spring and summer.
Persistent but not invasive. Forget-me-not
need moisture; good along with stream banks.
BAMBOO
Bamboo is one of the fastest-growing plants,
reaching full size in only 2-3 months. Some
bamboo has been recorded growing 120
centimeters in a single day. After reaching its
full height, bamboo ceases growing, hence
there is no annual growth ring seen in
harvested bamboo. A bamboo shoot's lifespan
is typically about 20 years. It has an extensive
root system that continually sends up new
shoots and lives for many decades. Bamboo is
hard and resilient. It will split cleanly along its
vertical grain, and can be split as fine as
0.3mm in diameter. This readiness to split
means bamboo lends itself very well to craft
production.
40,000
FORGET-ME-NOT
M. scorpioides is a perennial; M. sylvatica selfsows. Both have pale blue flower with pink,
yellow, or white centers in spring and summer.
Persistent but not invasive. Forget-me-not
need moisture; good along with stream banks.
BAMBOO
Bamboo is one of the fastest-growing plants,
reaching full size in only 2-3 months. Some
bamboo has been recorded growing 120
centimeters in a single day. After reaching its
full height, bamboo ceases growing, hence
there is no annual growth ring seen in
harvested bamboo. A bamboo shoot's lifespan
is typically about 20 years. It has an extensive
root system that continually sends up new
shoots and lives for many decades. Bamboo is
hard and resilient. It will split cleanly along its
vertical grain, and can be split as fine as
0.3mm in diameter. This readiness to split
means bamboo lends itself very well to craft
production.
40,000
SM 5 EARTHWORKS CONSTRUCTION
ACTIVITY POLLUTION CONTROL
35%
10%
14%
20%
21%
STANDARDS REFERENCE
PREPARED PROJECT
DEVELOPMENT
Silt Fence
PREPARED PROJECT
DEVELOPMENT
Stockpile
Wet sediment
Basin sedimentation
1586.1 m3
1072 m2
793.05 m3
Base:
WB = 11 m LB = 62 m
Depth:
Settling Zone, y1 = 0.75m
Settling Storage Zone, y2 =
1.00m
20 minutes
2.34m
Q10
0.40m^3/s
Qriser
0.36m^3/s
Qspillway
0.04m^3/s
Trapping efficiency
351.98 m3
Dry sediment
Basin sedimentation
933 m3
780m2
466.5 m3
Base:
WB = 11 m LB = 48 m
Depth:
Settling Zone, y1 = 0.6m
Settling Storage Zone, y2 =
0.80m
Q10
0.40m^3/s
Qriser
0.36m^3/s
Qspillway
0.04m^3/s
Trapping efficiency
351.98m^3
POST-CONSTRUCTION
Nil
Requirements
Achieve quality of workmanship in construction
works:
ASSESS QUALITY OF
WORKMANSHIP
USING QLASSIC
ASSESSMENT
Category of Building
Category A
Detached
Semi-detached
Terrace
Cluster house
Category B
Flat
Apartment
Condominium
Service Apartment
Town House
Office Building
School
Category C For public used..etc
Category D
Hospital
Airport
Components
Category
A
(Landed
housing)
Category
B
(Stratified
housing)
Category
C
(Public
Building)
Category
D
(Special
Public
Building)
Structural Works
25%
30%
30%
30%
Architectural
Works
60%
50%
45%
35%
M & E Works
5%
10%
15%
25%
External Works
10%
10%
10%
10%
Total Score
100%
100%
100%
100%
COMPONENTS OF CONSTRUCTION
INDUSTRY STANDARD
Structural
Works
Deal mainly with the finishes. (quality and standards of workmanship are most visible).
Examples:
Architectura Floors, internal walls, ceiling, door and window, fixtures and fittings, external wall, roofs, driveway,
porch.
l Works
Quality M&E works important in view of increasing high cost proportion and its impact on a building
performance.
Mechanical Assessment generally on:
& Electrical Electrical works, air-conditioning and mechanical ventilation works (ACMV), fire protection works,
(M&E)
sanitary & plumbing works, escalator & others basic of M&E fittings.
Works
External
Works
Nil
STORMWATER DESIGN
Requirements by GBI
Proposed Action:
Referring to Urban Stormwater Management
Manual for Malaysia
2012 (2nd Edition) publish
by Department of
Irrigation and Drainage
Malaysia.
Not achieved.
GBI Maximum Point : 1
Nil
What Is BUM?
A formal documentation of a building itself and its
components, including operation and maintenance of the
building.
It comprises of:
Building Technical Specification
Building Maintenance and Management
Building Manual (for occupants and all the procedures
related to the building).
Requirements
Provide a Building User Manual which documents all the
passive and active features that are part of the building and
highlight all passive and active features that should not be
downgraded.
Approach & Implementation
The preparation of BUM should commence during design
concept stage and continue to be developed during all
subsequent stages including construction.
Participation by all consultants and building owner.
Day lighting
Shading
Landscaping
Building Research
Establishment-Handing Over
Management HOBO)
5,000
MATERIALS AND
RESOURCES [MR]
[MR1]Material Reuse and Selection
[MR2] Recycled Content Material
[MR3] Regional Materials
[MR4] Sustainable Timber
[MR5] Storage and Collection of
Recyclables
[MR6] Construction Waste
Management
[MR7] Refrigerant and Clean Agents
MINIMUM PERFORMANCE OF MR
MR
CREDIT
MAX
POINT
TARGET
POINT
ADDITIONAL
COST (RM)
Regional Materials
Sustainable Timber
12, 240
11
12, 240
TOTAL
Workers Quarters
1. HDPE water storage
2. Corrugated zinc
3. Used woodens
SUPPLIER/SOURC
E OF MATERIAL
USAGE OF
MATERIAL
QUANTITY
UNIT
ESTIMATION COST
PER UNIT (RM)
ESTIMATION VALUE OF
MATERIALS (RM)
Site Temporary
Office Cabin
Site office
Nos
5,000
20,000.00
Metal sheet
hoarding
BSS Development
Sdn. Bhd.
Perimeter of basement
construction
260
50.00
13,000.00
Vertical frame
Sumi-Tech Industrial
Supplies Sdn.Bhd.
Scaffolding
component
500
Nos
119.90
59,950.00
Construction
safety net
Avoid falling of
construction material
5,000
m2
2.75
13,750.00
NA
Lot
10,000
10,000.00
Nos
1,500
4,500.00
50
Nos
26.00
1,300.00
Used wooden
Off-site
Workers quarters
doors and
windows
Plastic water
Off-site
Workers quarters
storage
Aluminum zinc
Off-site
Workers quarters
(corrugated zinc
sheet)
TOTAL ESTIMATION OF REUSE MATERIAL COST
TOTAL ESTIMATION OF MATERIAL COST VALUE
PERCENTAGE OF MATERIAL REUSED BY COST
RM 122,500.00
RM 1,770,267.50
6.92%
Post-Consumer
Cost (RM)
[a] [b]
Pre-Consumer
Content (%)
[c]
Pre-Consumer
Cost (RM)
[a] [c]
2
Material
Source of
Material
Usage of
Material
Quantity
Unit
Concrete Floor
Bomanite
(Malaysia) Sdn.
Bhd.
Floor structure
2,338.60
Tons
320.00
748,352.00
37,417.60
10
37,417.60
Henner AAC
Blocks
Saint-Gobain AAC
Sdn. Bhd.
Wall structure
4,508.60
m2
38.63
174,167.22
70
121,917.05
NA
NA
Gypsum
ceiling board
Europe Board
Trading Sdn. Bhd.
All suspended
ceiling area
12,480.81
m2
10.00
124,808.10
NA
NA
90
84,936.60
Nexus Board
Trading
Plastering
9,017.20
m2
6.04
54,463.89
NA
NA
99
26,959.62
Pilkington
Windows
954.68
m2
105.20
100,432.34
20
15,541.72
NA
NA
Aluthai Metals
Roofing
6,291.60
m2
16.00
100,665.60
NA
NA
15
7,549.92
Rock mineral
wool
Insulation
material for
roof
6,291.60
m2
14.80
93,115.68
NA
NA
70
32,590.49
Reinforced in
situ concrete
grade 30
Lafarge Malaysia
Berhad
Roof RC slab
1,319.81
m2
236.80
312,531.00
15,626.55
10
15,626.55
Boral
plasterboard
Boral Plasterboard
Malaysia
Roofing
1,319.81
m2
9.50
12,538.20
2.84
356.08
24.18
1,515.87
RED TOP
Gypsum
Plaster
Glass
Aluminium
deck
Total
Total Estimation of Recycle Material Cost
Total Estimation of Material Cost Value
Percentage of Recycled Content Material Used by Cost
RM 190,859.00
RM 206,596.65
RM 397,455.65
RM 1,770,267.50
22.45%
REGIONAL MATERIALS
The 1-Sendayan Club project location is at
BANDAR SRI SENDAYAN, SEREMBAN , NEGERI
SEMBILAN
Source of
Material
Usage of
Material
Manufacturing Facility
Location
Quantity
Henner AAC
Blocks
Saint-Gobain
AAC Sdn. Bhd.
Wall structure
Nilai, Negeri
Sembilan
Gypsum Ceiling
board
Europe Board
Trading Sdn.
Bhd.
All suspended
ceiling area
Concrete Floor
Bomanite
(Malaysia) Sdn.
Bhd.
Floor structure
Material
Unit
Estimation
Cost per Unit
(RM)
Estimation Value of
Materials (RM)
4,508.60
m2
38.63
174,167.22
Seremban,
Negeri
Sembilan
18,874.8
m2
10.00
188,748.00
Georgetown,
Pulau Pinang
2,338.60
Tons
320.00
748,352.00
Parit Buntar,
Perak
1,319.81
m2
9.50
12,538.20
Approx. 34 km distance
Approx. 10 km distance
Boral plasterboard
Boral
Plasterboard
Roofing
Malaysia Approx. 381
km distance
RM 1,123,805.22
RM 1,770,267.50
63.48%
REGIONAL MATERIALS
It is estimated that the percentage of regional
materials achievable is 63.48%, meeting the
requirement for 1 mark under MR3 as it is 20% of
the projects total material cost value.
SUSTAINABLE TIMBER
Sample of Wood Products Certified by
MTCC and FSC
25%
20%
25%
30%
Uncertified wood
materials
Certified timber
doors
Certified timber
flooring
Certified timber
furnitures
SUSTAINABLE TIMBER
SUSTAINABLE TIMBER
By estimation, it is considered that approximately
80% of certified wood products are achieved, meeting
the requirement for 1 mark under MR4 where 50%
of wood material and products used are appropriately
certified.
Refuse Compartment
12,240
Other waste
Types of
construction
waste and
handling
methods:
Aluminum
Handling
Method
Anticipated %
Anticipated
Quantity (m)
Recycle/reuse
70
329
Recycle
80
3011
Reuse/salvage
100
1647
Tiles
Recycle
75
353
Cardboard
Recycle
100
1882
Reuse/recycle
100
1176
Packaging
materials
Recycle
100
4940
Concrete
Recycle/reuse
50
588
Timber/Wood
Recycle /salvage
100
2588
Electric Cable
Recycle
45
212
Plastic
Recycle
60
705
Cement
Reuse/salvage
25
235
100
2823
Plasterboard
Steel formwork
Glass
17666
23524
75%
WATER
EFFICIENCY [WE]
[WE1]Rainwater Harvesting
[WE2] Waste Water Recycling
[WE3] Water Efficient Landscape
[WE5] Metering & Detection System
INTRODUCTION
Code
Description
Point
Target point
WE 1 Rainwater harvesting
Total
RAINWATER HARVESTING
Requirement Summary
Item
Area of assessment
Detail
Point
1
or
2
Score
Cost
(RM)
120,000
Proposal action
- Amount of rainwater collected
- Potable water consumption
120,000
RAINWATER HARVESTING
A) Rainfall collected
Total
Rainfall
(mm)
Roof
Area (
m)
Total Run Of
Coefficient
2387.8
1747
292
Total Diversion
(mm)
Total
Collected
(m)
Total
Usage
(m)
Total
Balance
in tank
(m)
365
2669.5
4038.5
12006.0
RAINWATER HARVESTING
B) Total water consumptions
Fixture Type
Water closet
Water closet dual flush
Gender
Description
Male
Low flow
Female
Flow
(l/flush)
Duration (s)
Occupant
(person)
Usage
l per day
3.5
200
700
3.5
200
700
2.5
200
1500
Ablution tap
50%
Conventional
0.15
30
200
1800
Urinal
Male
Waterless
0.02
200
12
Bib Tab
50%
Low flow
0.08
20
200
320
WH Basin
All
Conventional
0.15
12
400
2880
Types
Description
Flow
(l/flush)
Duration (s)
Occupant
(person)
Usage
l per day
Water closet
Fitting
Low flow
4.5
70
315
Urinal
Fitting
Waterless
0.02
30
0.6
WH Basin
Fitting
Conventional
0.15
50
37.5
Cleaning
Total
8265.1
Days
365
Total annual
3,016,761.5
CONTS
Location
Type
Lower
ground
Ground
Shrubs + turf
+tree
Shrubs + turf
Area
(m)
480
Irrigation
method
Drip
1184
Sprinkle
109
545
Total = 1009
4,025,761.5 l
RAINWATER HARVESTING
RAINWATER HARVESTING
Design Assessment
RAINWATER HARVESTING
Design Assessment
Distribution diagram
Detail
Point
Score
Cost
(RM)
1
or
2
150,000
Proposal action
-Total grey water
- Total recycle grey water
150,000
Fixture Type
Water closet
Water closet dual flush
Gender
Description
Male
Female
Low flow
Flow
(l/flush)
Duration (s)
Occupant
(person)
Usage
l per day
3.5
200
700
3.5
200
700
2.5
200
1500
Ablution tap
50%
Conventional
0.15
30
200
1800
Urinal
Male
Waterless
0.02
200
12
Bib Tab
50%
Low flow
0.08
20
200
320
WH Basin
All
Conventional
0.15
12
400
2880
Types
Description
Flow
(l/flush)
Duration (s)
Occupant
(person)
Usage
l per day
Water closet
Fitting
Low flow
4.5
70
315
Urinal
Fitting
Waterless
0.02
30
0.6
WH Basin
Fitting
Conventional
0.15
50
37.5
Cleaning
Total
8265.1
Days
365
Total annual
3,016,761.5
Gender
Description
Flow
(l/flush)
Ablution tap
50%
Conventional
0.15
30
200
1800
WH Basin
All
Conventional
0.15
12
400
2880
Fixture Type
Duration (s)
Occupant (person)
Usage
l per day
Total
4680
Days
270
Total annual
1,708,200
Detail
Point
1
or
2
Score
Cost
(RM)
75,000
Proposal action
For the proposal planning, we suggest to used:
-More on the shrub and tree because it is easy to handle and care
-Use drippers system to save the water
75,000
Location
Type
Area
(m)
Irrigation
method
Amount
m
480
Drip
58
464
1184
Sprinkle
109
545
Total = 1009
Shrubs + turf
Total water
usage
m/annum
Total day
Usage (m/day)
Rainfall
(mm)
2387.8
Run Of
Coefficient
292
Diversion
(mm)
365
Collected
(m)
2669.5
Balance
in tank
(m)
Irrigation
WC &
Urinal
Others
1009
3029.5
12006.0
Area of assessment
Detail
Point
For incorporation of sub-meters to
1
monitor
1
and manage major water usage systems such
as cooling towers, irrigation, kitchens and
tenant spaces.
For linking sub-meters to EMS to facilitate
early detection of water leakage.
Score
1
1
Cost
(RM)
No additional
costs as
incorporated in
the MS1525
tender
30,000
Proposal action
- Using EMS device with the sub-metering systems
30,000
INNOVATION [IN]
[IN 1] Innovation in Design &
Environmental Design Initiative
[IN 2] GBI Facilitator
INNOVATION
ID
IN 1
IN 2
Credits
Maximum
Target
Silver
Cost (RM)
Light Pipes
30,000.00
30,000.00
Waterless Urinals
9,500.00
WE
Solar Thermal
10,380.00
GBI Facilitator
79,880.00
Total
INNOVATION
1- LIGHT PIPES
Compliment in building lighting
system
Suitable for Malaysia climate (long
exposure to daylight, 12
hours/day)
Reduce usage of electricity
INNOVATION
2- Mixed Mode Ventilation System
Hybrid approach of combination
natural ventilation and HVAC
Control manually or automatically
INNOVATION
3- Waterless Urinals
Standing bowls in male toilet
flushing mechanical
INNOVATION
4- Recycling water for sprinkle fire system
Replacing usage potable water
with collectible rain water
Regular fire testing and actual
function
INNOVATION
5- Solar Thermal
PV convert sunlight directly into
electricity
Produce hot water for club usage
(hot shower and spa)
Yearly Cost
Electricity bill
538,778.63
Water bill
11,916.25
Operation cost
1,000,000.00
Maintainance cost
100,000
Total
1,650,694.88
Restaurant
240,000.00
Banquet hall
240,000.00
Gaming
1,200,000.00
Total
1,680,000.00
5,375,514.50
41,609,914.10
46,985,428.60
555,935.00
5,559.35
RM10,000.00
723
RM7,230,000
RM300.00
RM216,815
RM1,680,000.00
1,650,694.88
7,476,119.771
15.91%
6.28
CONCLUSION