Client Handover Inspection Notes - B0109

Room Ref
General Note
General Note
General Note
General Note
General Note
General Note
GF02
GF02
GF02
GF02

GF05
GF05
GF06
GF07
GF07
GF07
GF07
GF09
GF09
GF10
GF14
GF15
GF15
GF16
GF17
GF19
GF19
GF21/22
GF21a/21b/21c
GF26
GF26
GF27
GF27
GF29
GF29
GF32
GF32
GF33

Description of Defect/Snag
Drench shower to have isolator switch at low level (Out of
scope)
All toilets to be fitted with correct toilet paper holders, paper
towel & soap dispensers
Fire alarm log book missing
Data incomplete throughout building, no certification as yet.
Finish locks in doors
Hercules to note GF14, top corner of existing brickwork
remains cracked but has been painted over.
Fit 1 no. blind to window far right of room
Make good hole in vinyl
2 no. handles missing on window to far side of room
Tidy up window cill (2nd from left)
2 no. windows to be added on external facing wall as part of
agreement with Building Control to make room compliant
(Out of Scope, but Hercules to action)
Hole in vinyl make good.
Ceiling tiles missing
Make good top of door and lock leading to GF8
End cap to trunking loose
2 no. ceiling tiles
Existing door leading to corridor (GF13) ironmongery

Date to be completed

Signed of

?
6/10/2015
Done

Sam Hudson

Done
Done

Sam Hudson
Sam Hudson

Done
Done
Done
Done
Done

Sam
Sam
Sam
Sam
Sam

Hudson
Hudson
Hudson
Hudson
Hudson

just painting 10/6/15


Done
Done
Done
Done
Done

Sam
Sam
Sam
Sam
Sam

Hudson
Hudson
Hudson
Hudson
Hudson

Sam
Sam
Sam
Sam
Sam
Sam
Sam
Sam
Sam
Sam
Sam
Sam
Sam
Sam

Hudson
Hudson
Hudson
Hudson
Hudson
Hudson
Hudson
Hudson
Hudson
Hudson
Hudson
Hudson
Hudson
Hudson

Sam
Sam
Sam
Sam
Sam

Hudson
Hudson
Hudson
Hudson
Hudson

Done
Done
Replace ceiling tiles
Done
Blind cover to be removed
Done
Replace ceiling tiles
Done
Locks to be completed
Done
Fit grille at floor level around drainpipe
Done
Screws missing from hinges
Done
Fit benches and lockers
Done
Fit benches & lockers
Done
Clean 2 no. sinks
Done
Clean paint of wall
Done
To be re-inspected once works completed
Done
To be re-inspected once works completed
Done
Ironmongery for external door
6/22/2015
Tidy up wiring for roller shutter door
Done
Finish ironmongery
Done
Replace damp-damaged ceiling tile
Done
Finish drench shower
Done
Ceiling tiles to be completed
Done
Pipebox lid to be completed
6/10/2015
Paint cill in far right corner
Done
Previous fire door to be eased and adjusted
Remove hoist of existing crane until stoppers can be fitted
(agreement with end user 28.05/15)
GF33
Done
GF35
Done
expanding foam in holes around wires
**Note: Items highlighted in red = Out of scope, to consider implementing post-handover