Sunteți pe pagina 1din 44

RESUMEN DE LIQUIDACION

ENTIDAD
CONTRATISTA

:
:

OBRA

MODALIDAD DE EJECUCIN
ADJUDICACIN DIRECTA SELECTIVA
VALOR REFERENCIAL
PRESUPUESTO CONTRATADO

:
:
:

MUNICIPALIDAD PROVINCIAL DE HUAR


CONSORCIO VIRGEN DEL CARMEN

"Mejoramiento de Agua Potabl


Sistema de Alcantarillado de la C
Distrito de Paccho, Provincia de
Instalacion de Agua

ADMINISTRACIN PRESUPUESTARIA IN
ADS N 012-2014- CEP/MPH
S/. 434,241.65
S/. 434,241.65

MONTO
CONTRACTU
AL

DESCRIPCION

MONTO DE VALORIZACION
PAGADO

(A) DE LAS VALORIZACIONES (Sin IGV)


Valorizac. 01 - Julio 2014 95,061.65
Valorizac. 02- Agosto 2014 151,103.96
Valorizac. 03- Setiembre 2014 121,835.79
TOTAL VALORIZACIONES 368,001.40

188,750.15
161,524.78
17,726.47
368,001.40

(B) REAJUSTES DE PRECIOS (Sin IGV)


2,186.42
3,626.50
3,167.73
8,980.64

0.00
0.00
0.00
0.00

10% del
( C) GARANTIA DE FIEL CUMPLIMIENTO (10%) (Sin IGV)
monto
Valorizac. 01 - Julio 2014 contractual
Valorizac. 02- Agosto 2014
S/.
Valorizac. 03- Setiembre 2014 368,001.40
TOTAL REAJUSTE
36,800.14

0.00
0.00
0.00
0.00

Valorizac. 01 - Julio 2014


Valorizac. 02- Agosto 2014
Valorizac. 03- Setiembre 2014
TOTAL REAJUSTE

(D) ADELANTOS OTORGADOS (Sin IGV)


Adelanto Directo
Amortizacion Adelanto Directo
Adelanto para materiales
Amortizacion Adel. Para Materiales
TOTAL ADELANTOS

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

TOTAL DEDUCCIONES

0.00
0.00
0.00

0.00
0.00
0.00

(E) DEDUCCION DE REAJUSTES (Sin IGV)


Adelanto Directo
Adelanto para materiales

(F) TOTAL GENERAL (A+B+C+D+E) (Sin IGV)

(G) IMP. GRL. A LAS VENTAS 18%

(H) COSTO OBRA PRINCIPAL

(I) PRESUPUESTO CONTRACTUAL


Concepto
Multa por demora en termino de Obra
(J) SALDO A CANCELAR
Monto a cancelar en Efectivo (inc. IGV)

0.00

0.00

UMEN DE LIQUIDACION
MUNICIPALIDAD PROVINCIAL DE HUARA
CONSORCIO VIRGEN DEL CARMEN

"Mejoramiento de Agua Potable e Instalacion del


Sistema de Alcantarillado de la Comunidad de Muzga,
Distrito de Paccho, Provincia de Huaura" META 02:
Instalacion de Agua Potable"

ADMINISTRACIN PRESUPUESTARIA INDIRECTA (CONTRATA)


ADS N 012-2014- CEP/MPH

MONTO DE VALORIZACION
RECALCULADO

188,750.15
161,524.78
17,726.47
368,001.40

SALDO A FAVOR DEL


CONTRATISTA

0.00
0.00
0.00
0.00

4,341.25
3,876.59
460.89
8,678.73

4,341.25
3,876.59
460.89
8,678.73

18,400.07
18,400.08
0.00
36,800.14

18,400.07
18,400.08
0.00
36,800.14

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

45,478.87

8,186.20

53,665.07

0
0

0.00

53,665.07

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM
01
01.01
01.02
01.03
01.04
02
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.02.06
02.03
02.03.01

DESCRIPCION
OBRAS PROVISIONALES
ALMACEN Y DEPOSITO
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60x2.
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y
FLETE TERRESTRE
LINEA DE ADUCCION
TRABAJO PRILIMINARES
LIMPIEZA Y DEFORESTACION MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACIN MANUAL DE ZANJAS EN TIERRA SUESL
REFINE Y NIVELACION ZANJA EN TIERRA SUELTA P
CAMA DE APOYO PARA TUBERIAS PVC C-7.5 NTP I
RECUBRIMIENTO DE TUBERIA CON MATERIAL PROP
RELLENO COMPACTADO DE ZANJAS HASTA H<1.0
ELIMINACION DE MATERIAL EXCEDENTE
TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC C-7

UND

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO

mes
und
GLB
GLB

3.00
1.00
1.00
1.00

600.00
1068.98
4000.00
6102.00

m2
m2

201.98
201.98

4.22
2.99

m
m
m
m
m3
m3

201.98
201.98
201.98
201.98
38.78
25.85

18.51
1.77
13.13
3.97
31.15
11.24

201.98

18.32

12970.98
1800.00
1068.98
4000.00
6102.00
14911.89
1456.28
852.36
603.92
9048.56
3738.65
357.50
2652.00
801.86
1208.00
290.55
3700.27
3700.27

1.00
1.00
1.00
1.00

201.98
201.98
181.78
181.78
181.78
100.99
19.39
12.93
161.58

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM
02.04
02.04.01
02.04.02
02.04.03
02.05
02.05.01
03
03.01
03.01.01
03.01.02
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.03

DESCRIPCION

UND

METRADO

ACCESORIOS
SUM. E INSTALACION DE CODO PVC 75 MM X 90
und
1.00
SUM. E INSTALACION DE CODO PVC 75 MM X 45
und
5.00
SUM. E INSTALACION DE CODO PVC 75 MM X 22.
und
2.00
PRUEBAHIDRULICA
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA
m
201.98
RED DE DISTRUBUCION
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO
m
2438.37
TRAZO Y REPLANTEO PRELIMINAR
m
2438.37
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL ( 0.40
m
2438.37
REFINE Y NIVELACION ZANJA EN TERRENO NORMA
m
2438.37
CAMA DE APOYO PARA TUBERA DE AGUA (e=10cm,
m
2438.37
RECUBRIMIENTO DE TUBERIA CON MATERIAL PROP
m
2438.37
RELLENO COMPACTADO DE ZANJA CON MATERIAL PROPIO SELECCIONADO
m3
487.68
ELIMINACION DE MATERIAL EXCEDENTE
m3
448.66
TUBERIAS

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO
40.63
40.63
40.63
1.89

2.27
2.78
13.14
2.48
13.13
3.97
19.29
11.24

325.04
40.63
203.15
81.26
381.74
381.74
278898.03
12313.77
5535.10
6778.67
94233.76
32040.18
6047.16
32015.80
9680.33
9407.35
5042.94
32178.92

1.00
5.00
2.00
0.00

2,438.37
2,438.37
2,316.45
2,316.45
1,800.00
1,400.00
121.92
0.00

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM
03.03.01
03.03.02
03.03.03
03.04
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
03.04.08
03.04.09
03.04.10
03.04.11
03.04.12
03.04.13
03.05

DESCRIPCION

UND

SUMINISTRO E INST. TUBERIA PVC C-10 NTP ISO


SUMINISTRO E INST. TUBERIA PVC C-10 NTP ISO
SUMINISTRO E INST. TUBERIA PVC C-10 NTP ISO
SUMINISTRO E INSTALACION DE ACCESORIOS
SUMINISTRO E INST. DE CODO PVC 75MM X 90
SUMINISTRO E INST. DE CODO PVC 75MM X 90
SUMINISTRO E INST. DE CODO PVC 75MM X 22.5
SUMINISTRO E INST. DE CODO PVC 63MM X 90
SUMINISTRO E INST. DE CODO PVC 63MM X 45
SUMINISTRO E INST. DE CODO PVC 63MM X 22.5
SUMINISTRO E INST. DE CODO PVC 25MM X 90
SUM. E INSTALACION DE TEE PVC 75MM
SUM. E INSTALACION DE TEE PVC 63MM
SUM. E INSTALACION DE TAPON HEMBRA 63MM
SUM. E INSTALACION DE TAPON HEMBRA 25MM
SUMINISTRO E INSTALACION DE REDUCCION PVC
SUMINISTRO E INSTALACION DE REDUCCION PVC
PRUEBAHIDRULICA

m
m
m
und
und
und
und
und
und
und
und
und
und
und
und
und

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO

792.08
1556.29
90.00

18.32
11.13
3.85

1.00
27.00
3.00
16.00
28.00
6.00
1.00
15.00
16.00
10.00
1.00
17.00
1.00

40.20
40.20
40.20
36.60
36.60
36.60
23.30
50.70
34.20
31.00
23.50
41.13
39.13

14510.91
17321.51
346.50
5479.04
40.20
1085.40
120.60
585.60
1024.80
219.60
23.30
760.50
547.20
310.00
23.50
699.21
39.13
4608.52

712.87
778.15
90.00
1.00
27.00
3.00
8.00
14.00
3.00
1.00
15.00
16.00
0.00
0.00
17.00
1.00

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM
03.05.01
03.06
03.06.01
03.06.02
03.07

DESCRIPCION
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA
OBRAS ESPECIALES
ENCOFRADO Y DESENCOFRADO DE ANCLAJE DE A
CONCRETO f'c=140 kg/cm2 PARA ANCLAJES Y/O D
CAMARA PARA VALVULA DE CONTROL

UND
m
und
m3

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO

2438.37

1.89

24.30
2.50

47.24
332.94

4608.52
1980.28
1147.93
832.35
12612.83

0.00
24.30
2.50

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM
03.07.01
03.07.01.01
03.07.01.02
03.07.02
03.07.02.01
03.07.02.02
03.07.03
03.07.03.01
03.07.03.02
03.07.04
03.07.04.01
03.07.05
03.07.05.01
03.07.05.02
03.07.06
03.07.06.01
03.07.07
03.07.07.01

DESCRIPCION
TRABAJO PRELIMINARES
LIMPIEZA DE TERRENO
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA ESTRUCTURAS
ELIMINACION DE MATERIAL EXCEDENTE
OBRAS DE CONCRETO SIMPLE
CONCRETO, F'C=175 Kg/cm2
ENCOFRADO Y DESENCOFRADO
REVOQUES Y ENLUCIDOS
TARRAJEO EXTERIOR MORTERO 1:5; e=1.5cm
VLVULAS Y ACCESORIOS
ACCESORIOS GLOBAL PARA C. DE VLVULA DE C
ACCESORIOS GLOBAL PARA C. DE VLVULA DE C
CARPINTERIA METALICA
TAPA METALICA 0.40 x 0.40 x 1/8"
PINTURA
PINTURA ANTICORROSIVA / ESMALTE PARA METAL

UND

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO

m2
m2

6.40
6.40

4.73
2.99

m3
m3

5.10
6.38

41.31
11.24

m3
m2

2.00
28.00

401.01
47.24

m2

8.00

27.18

GLB
GLB

2.00
11.00

753.17
628.67

und

10.00

146.84

m2

3.20

15.23

49.41
30.27
19.14
282.39
210.68
71.71
2124.74
802.02
1322.72
217.44
217.44
8421.71
1506.34
6915.37
1468.40
1468.40
48.74
48.74

6.40
6.40
5.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM

DESCRIPCION

03.08
VALVULA PURGA TIPO I
03.08.01
TRABAJOS PRELIMINARES
03.08.01.01
LIMPIEZA DE TERRENO
03.08.01.02
TRAZO Y REPLANTEO PRELIMINAR
03.08.02
MOVIMIENTO DE TIERRAS
03.08.02.01
EXCAVACION MANUAL PARA ESTRUCTURAS
03.08.02.02
RELLENO CON MATERIAL PROPIO
03.08.02.03
ELIMINACION DE MATERIAL EXCEDENTE
03.08.03
CONCRETO SIMPLE
03.08.03.01
SOLADO e= 0.05m
03.08.03.02
DADO DE ANCLAJE F'C=140 Kg/cm2
03.08.04
OBRAS DE CONCRETO ARMADO
03.08.04.01
CONCRETO, F'C=175 KG/cm2
03.08.04.02
ENCOFRADO Y DESENCOFRADO
03.08.04.03
ACERO F'Y=4200kg/cm2
03.08.05
REVOQUES Y ENLUCIDOS
03.08.05.01
TARRAJEO EXTERIOR MORTERO 1:5; e=1.5cm
03.08.06
VLVULAS Y ACCESORIOS

UND

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO

m2
m2

12.12
10.92

4.73
2.99

m3
m3
m3

6.56
2.76
4.75

41.31
41.31
11.24

m3
m3

5.24
0.08

313.11
332.94

m3
m2
kg

1.60
21.28
109.44

406.16
47.24
4.52

m2

11.52

27.18

7207.63
89.98
57.33
32.65
438.40
270.99
114.02
53.39
1667.34
1640.70
26.64
2149.80
649.86
1005.27
494.67
313.11
313.11
1798.40

12.12
10.92
6.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM

DESCRIPCION

03.08.06.01
SUMINISTRO E INSTALACION DE ACCESORIOS
03.08.07
CARPINTERIA METALICA
03.08.07.01
TAPA METALICA 0.40 x 0.40 x 1/8"
03.08.08
PINTURA
03.08.08.01
PINTURA ANTICORROSIVA / ESMALTE PARA METAL
03.08.09
FILTROS
03.08.09.01
FILTRO
03.09
VALVULA REDUCTORA DE PRESION
03.09.01
TRABAJOS PRELIMINARES
03.09.01.01
LIMPIEZA DE TERRENO
03.09.01.02
TRAZO Y REPLANTEO PRELIMINAR
03.09.02
MOVIMIENTO DE TIERRAS
03.09.02.01
EXCAVACION MANUAL PARA ESTRUCTURAS
03.09.02.02
ELIMINACION DE MATERIAL EXCEDENTE
03.09.03
CONCRETO SIMPLE
03.09.03.01
SOLADO e= 0.05m
03.09.03.02
DADO DE ANCLAJE F'C=140 Kg/cm2
03.09.04
OBRAS DE CONCRETO ARMADO

UND

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO

und

4.00

449.60

und

4.00

146.84

m2

4.80

15.23

m3

0.44

204.87

m2
m2

17.16
17.16

4.73
2.99

m3
m3

39.86
43.44

41.31
11.24

m3
m3

1.62
0.12

313.11
332.94

1798.40
587.36
587.36
73.10
73.10
90.14
90.14
12717.30
132.48
81.17
51.31
2134.89
1646.62
488.27
547.19
507.24
39.95
6170.62

0.00
0.00
0.00
0.00

17.16
17.16
39.86
0.00
0.00
0.00

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM

DESCRIPCION

03.09.04.01
CONCRETO, F'C=175 KG/cm2
03.09.04.02
ENCOFRADO Y DESENCOFRADO
03.09.04.03
ACERO F'Y=4200kg/cm2
03.09.05
REVOQUES Y ENLUCIDOS
03.09.05.01
TARRAJEO EXTERIOR MORTERO 1:5; e=1.5cm
03.09.06
VLVULAS Y ACCESORIOS
03.09.06.01
SUMINISTRO E INSTALACION DE ACCESORIOS
03.09.07
CARPINTERIA METALICA
03.09.07.01
TAPA METALICA D=0.30 m x 1/8" + MARCO DE M
03.09.08
PINTURA
03.09.08.01
PINTURA ANTICORROSIVA / ESMALTE PARA METAL
03.10
CONEXION DOMICILIARIA
03.10.01
LIMPIEZA DE TERRENO
03.10.02
TRAZO Y REPLANTEO PRELIMINAR
03.10.03
EXCAVACION DE ZANJA,TERRENO NORMAL, TUBERIA
03.10.04
REFINE Y NIVELACION ZANJA EN TERRENO NORMA
03.10.05
CAMA DE APOYO PARA TUBERA DE 1/2" TERRE
03.10.06
RECUBRIMIENTO DE TUBERIA CON MATERIAL PROP

UND

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO

m3
m2
kg

9.92
21.28
251.38

406.16
47.24
4.52

m2

33.84

27.18

und

2.00

1285.79

und

2.00

118.10

m2

0.30

15.23

m2
m2
m
m
m
m

486.20
78.54
860.20
748.00
748.00
748.00

4.73
5.10
12.63
1.77
12.98
3.97

4029.11
1005.27
1136.24
919.77
919.77
2571.58
2571.58
236.20
236.20
4.57
4.57
95565.98
2299.73
400.55
10864.33
1323.96
9709.04
2969.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00
486.20
78.54
430.10
374.00
149.60
149.60

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM
03.10.07
03.10.08
03.10.09
03.10.10
04
04.01
04.02.

DESCRIPCION

UND

RELLENO CON MATERIAL PROPIO


ELIMINACION DE MATERIAL EXCEDENTE
CONEXION AGUA 1/2" HASTA 4.00 M INC. LOSA 1X
PRUEBA HIDRAULICA + DESINFECCION DE TUBERIA
CAPACITACION
EDUCACION SANITARIA
CONFORMACION Y CAPACITACION A LA JASS

m
m3
und
m

299.20
112.20
187.00
748.00

12.56
11.24
329.23
1.89

GLB
GLB

1.00
1.00

2542.32
2542.37

COSTO DIRECTO
GASTOS GENERALES (10.00 %)
UTILIDAD (8.00%)
SUB TOTAL
SUB TOTAL AFECTADO F.R.= 1.0000
IMPUESTO GENERAL A LAS VENTAS - I.G.V. (18 %)
TOTAL (S/.)

S/.
S/.
S/.
S/.
S/.
S/.

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO
3757.95
1261.13
61566.01
1413.72
5084.69
2542.32
2542.37

311,865.59
31,186.56
24,949.25
368,001.40
368,001.40
66,240.25
434,241.65

59.84
22.44
40.00
0.00
0.00
0.00

RESUMEN

CON
Entidad

MUNICIPALIDAD PROVINCIAL DE HUAURA

Obra

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO
PRESUPUESTADO

ITEM

DESCRIPCION

UND

METRADO

VALORIZACION N
JULIO 2014

PRECIO
PARCIAL (S/.)
(S/.)
METRADO

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014
%

METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014
METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

600.00
1,068.98
4,000.00
6,102.00

33.33
100.00
100.00
100.00

1.00
0.00
0.00
0.00

600.00
0.00
0.00
0.00

33.33
0.00
0.00
0.00

1.00
0.00
0.00
0.00

600.00
0.00
0.00
0.00

33.33
0.00
0.00
0.00

3.00
1.00
1.00
1.00

600.00
1,068.98
4,000.00
6,102.00

852.36
603.92

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

201.98
201.98

4.22
2.99

3,364.75
321.75
2,386.77
400.93
604.00
145.33

90.00
90.00
90.00
50.00
50.00
50.02

20.20
20.20
20.20
100.99
19.39
12.92

373.90
35.75
265.23
400.93
604.00
145.22

10.00
10.00
10.00
50.00
50.00
49.98

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

201.98
201.98
201.98
201.98
38.78
25.85

18.51
1.77
13.13
3.97
31.15
11.24

2,960.15

80.00

40.40

740.12

20.00

0.00

0.00

0.00

201.98

18.32

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014
METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014
METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

40.63
203.15
81.26

100.00
100.00
100.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

1.00
5.00
2.00

40.63
40.63
40.63

0.00

0.00

201.98

381.74

100.00

0.00

0.00

0.00

201.98

1.89

5,535.10
6,778.67

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

2,438.37
2,438.37

2.27
2.78

30,438.15
5,744.80
23,634.00
5,558.00
2,351.84
0.00

95.00
95.00
73.82
57.42
25.00
0.00

121.92
121.92
638.37
1,038.37
365.76
448.66

1,602.03
302.36
8,381.80
4,122.33
7,055.51
5,042.94

5.00
5.00
26.18
42.58
75.00
100.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

2,438.37
2,438.37
2,438.37
2,438.37
487.68
448.66

13.14
2.48
13.13
3.97
19.29
11.24

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014

13,059.82
8,660.75
346.50

%
90.00
50.00
100.00

40.20
1,085.40
120.60
292.80
512.40
109.80
23.30
760.50
547.20
0.00
0.00
699.21
39.13

100.00
100.00
100.00
50.00
50.00
50.00
100.00
100.00
100.00
0.00
0.00
100.00
100.00

METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014

79.21
778.14
0.00

1,451.13
8,660.70
0.00

%
10.00
50.00
0.00

0.00
0.00
0.00
8.00
14.00
3.00
0.00
0.00
0.00
10.00
1.00
0.00
0.00

0.00
0.00
0.00
292.80
512.40
109.80
0.00
0.00
0.00
310.00
23.50
0.00
0.00

0.00
0.00
0.00
50.00
50.00
50.00
0.00
0.00
0.00
100.00
100.00
0.00
0.00

METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

792.08
1,556.29
90.00

18.32
11.13
3.85

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.00
27.00
3.00
16.00
28.00
6.00
1.00
15.00
16.00
10.00
1.00
17.00
1.00

40.20
40.20
40.20
36.60
36.60
36.60
23.30
50.70
34.20
31.00
23.50
41.13
39.13

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014
METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014

0.00

0.00

2,438.37

4,608.52

%
100.00

1,147.93
832.35

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

0.00

0.00

0.00

2,438.37

1.89

0.00
0.00

0.00
0.00

0.00
0.00

24.30
2.50

47.24
332.94

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014
METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014
METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

30.27
19.14

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

6.40
6.40

4.73
2.99

210.68
0.00

100.00
0.00

0.00
6.38

0.00
71.71

0.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

5.10
6.38

41.31
11.24

0.00
0.00

0.00
0.00

2.00
28.00

802.02
1,322.72

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

2.00
28.00

401.01
47.24

0.00

0.00

0.00

0.00

0.00

8.00

217.44

100.00

8.00

27.18

0.00
0.00

0.00
0.00

2.00
11.00

1,506.34
6,915.37

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

2.00
11.00

753.17
628.67

0.00

0.00

0.00

0.00

0.00

10.00

1,468.40

100.00

10.00

146.84

0.00

0.00

0.00

0.00

0.00

3.20

48.74

100.00

3.20

15.23

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014
METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014
METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

57.33
32.65

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

12.12
10.92

4.73
2.99

270.99
0.00
0.00

100.00
0.00
0.00

0.00
2.76
4.75

0.00
114.02
53.39

0.00
100.00
100.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

6.56
2.76
4.75

41.31
41.31
11.24

0.00
0.00

0.00
0.00

5.24
0.08

1,640.70
26.64

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

5.24
0.08

313.11
332.94

0.00
0.00
0.00

0.00
0.00
0.00

1.60
21.28
109.44

649.86
1,005.27
494.67

100.00
100.00
100.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

1.60
21.28
109.44

406.16
47.24
4.52

0.00

0.00

0.00

0.00

0.00

11.52

313.11

100.00

11.52

27.18

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014
METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014
METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

0.00

0.00

0.00

0.00

0.00

4.00

1,798.40

100.00

4.00

449.60

0.00

0.00

0.00

0.00

0.00

4.00

587.36

100.00

4.00

146.84

0.00

0.00

0.00

0.00

0.00

4.80

73.10

100.00

4.80

15.23

0.00

0.00

0.00

0.00

0.00

0.44

90.14

100.00

0.44

204.87

81.17
51.31

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

17.16
17.16

4.73
2.99

1,646.62
0.00

100.00
0.00

0.00
43.44

0.00
488.27

0.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

39.86
43.44

41.31
11.24

0.00
0.00

0.00
0.00

1.62
0.12

507.24
39.95

100.00
100.00

0.00
0.00

0.00
0.00

0.00
0.00

1.62
0.12

313.11
332.94

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014
METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014

0.00
0.00
0.00

0.00
0.00
0.00

9.92
21.28
251.38

4,029.11
1,005.27
1,136.24

%
100.00
100.00
100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
2,299.73
400.55
5,432.16
661.98
1,941.81
593.91

METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

9.92
21.28
251.38

406.16
47.24
4.52

0.00

33.84

919.77

100.00

33.84

27.18

0.00

0.00

2.00

2,571.58

100.00

2.00

1,285.79

0.00

0.00

0.00

2.00

236.20

100.00

2.00

118.10

0.00

0.00

0.00

0.00

0.30

4.57

100.00

0.30

15.23

100.00
100.00
50.00
50.00
20.00
20.00

0.00
0.00
430.10
374.00
598.40
598.40

0.00
0.00
5,432.16
661.98
7,767.23
2,375.65

0.00
0.00
50.00
50.00
80.00
80.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

486.20
78.54
860.20
748.00
748.00
748.00

4.73
5.10
12.63
1.77
12.98
3.97

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014

751.59
252.23
13,169.20
0.00

%
20.00
20.00
21.39
0.00

0.00
0.00

0.00
0.00

159,957.75
15,995.78
12,796.62
188,750.15
188,750.15
33,975.03
222,725.18

METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014

239.36
0.00
147.00
748.00

3,006.36
0.00
48,396.81
1,413.72

%
80.00
0.00
78.61
100.00

0.00
0.00

0.00
0.00

0.00
0.00

136,885.41
13,688.54
10,950.83
161,524.78
161,524.78
29,074.46
51.29%

190,599.24

METRADO

MONTO

TOTAL EJECUTADO
%

MONTO

0.00
89.76
0.00
0.00

0.00
1,008.90
0.00
0.00

0.00
80.00
0.00
0.00

299.20
112.20
187.00
748.00

12.56
11.24
329.23
1.89

1.00
1.00

2,542.32
2,542.37

100.00
100.00

1.00
1.00

2,542.32
2,542.37

15,022.43
1,502.24
1,201.79
17,726.47
17,726.47
3,190.76
43.89%

METRADO

20,917.23

311,865.59
31,186.56
24,949.24
368,001.40
368,001.40
66,240.25
4.82%

434,241.65

RESUMEN DE VALORIZACIONES
CONTRATO PRINCIPAL

NIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE AGUA POTABLE"
VALORIZACION N 01
JULIO 2014
MONTO

VALORIZACION N 02
AGOSTO 2014
%

METRADO

MONTO

VALORIZACION N 03
SETIEMBRE 2014
%

METRADO

MONTO

TOTAL EJECUTADO
%

METRADO

MONTO

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

100.00
101.00
102.00
103.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00
103.00
103.00
103.00
103.00
103.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

103.00

0.00

0.00

0.00

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

103.00
103.00
103.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

103.00

0.00

0.00

0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00
103.00
103.00
103.00
103.00
103.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

103.00
103.00
103.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

103.00
103.00
103.00
103.00
103.00
103.00
103.00
103.00
103.00
103.00
103.00
103.00
103.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

103.00

0.00

0.00

0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00

0.00

0.00

0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00

0.00

0.00

0.00

103.00

0.00

0.00

0.00

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00
103.00
103.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00
103.00
103.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

103.00

0.00

0.00

0.00

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

103.00

0.00

0.00

0.00

103.00

0.00

0.00

0.00

103.00

0.00

0.00

0.00

103.00

0.00

0.00

0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

103.00
103.00
103.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

103.00

0.00

0.00

0.00

103.00

0.00

0.00

0.00

103.00

0.00

0.00

0.00

103.00

0.00

0.00

0.00

103.00
103.00
103.00
103.00
103.00
103.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

103.00
103.00
103.00
103.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

103.00
103.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
100.00%

0.00

0.00%

N DE AGUA POTABLE"

TOTAL EJECUTADO

DEDUCTIVO DE CIERRE
%

METRADO

MONTO

CLCULO DEL COEFICIENTE "K" DE REAJUSTE MENSUAL


Area Geogr: 2
Obra
:
"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA
COMUNIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02: INSTALACIN DE
AGUA POTABLE"
K = 0.344*(Mr /Mo ) + 0.153*(Ir /Io ) + 0.141*(Tr /To ) + 0.083*(DFHr /DFHo ) + 0.144*(MMr /MMo ) + 0.135*(CAr /CAo )
Mon

Simb

IU

47

MANO DE OBRA INC. LEYES SOCIALES

39

INDICE GENERAL DE PRECIOS AL CONS

0.153

###

72

TUBERA DE PVC PARA AGUA

0.141

###

30

DLAR (GENERAL PONDERADO)

32

FLETE TERRESTRE

37

HERRAMIENTA MANUAL

45

MADERA TERCIADA PARA ENCOFRADO

DFH

Descripcin

Coeficie
ntes
% Incid
incidenci
a
0.344
###

MM

45.783%
0.083

34.940%
19.277%
46.780%

0.144
49

MAQUINARIA Y EQUIPO IMPORTADO

02

ACERO DE CONSTRUCCIN LISO

CA

53.220%
10.547%
0.135

21

CEMENTO PORTLAND TIPO I

89.453%

Base
Jan-14
498.10
0.344
393.46
0.153
370.19
0.141
381.51
0.038
455.19
0.029
298.19
0.016
311.89
0.067
249.28
0.077
479.33
0.014
339.42
0.121

Coeficientes de Reajuste
Jul-14
Aug-14
Sep-14
523.70
523.70
523.70
0.362
0.362
0.362
402.72
402.37
403.02
0.157
0.156
0.157
370.75
370.75
370.75
0.141
0.141
0.141
386.98
390.72
396.99
0.039
0.039
0.040
468.30
468.30
468.30
0.030
0.030
0.030
293.19
293.19
293.19
0.016
0.016
0.016
313.65
313.65
313.65
0.068
0.068
0.068
248.34
250.83
255.29
0.076
0.077
0.078
475.67
475.67
475.67
0.014
0.014
0.014
339.42
339.42
339.42
0.121
0.121
0.121

COEFICIENTE DE REAJUSTE "K" :

1.000

1.023

1.024

1.026

REINTEGRO POR REJUSTE DE FORMULA POLINOMICA


Obra:
"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO DE LA
COMUNIDAD DE MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02:
INSTALACIN DE AGUA POTABLE"
V= Valorizacin
Reajuste V (k-1)
Deduccin =
Monto adelanto *V (k-K de la fecha del adelanto)
Monto contrato sin IGV*Kdel mes del adelanto
VALORIZACIONES
No.

DESCRIPCION

PROGRAM.

PRESUPUESTO GENERAL
1 Valorizac. 01 - Julio 2
95,061.65
2 Valorizac. 02- Agosto 151,103.96
3 Valorizac. 03- Setiem 121,835.79
TOTALES

368,001.40

COEF. REAJ.
FECHA DE
EJECUTAD
PAGO
O
(K)
188,750.15
161,524.78
17,726.47
###

1.023
1.024
1.026

K-1

0.023
0.024
0.026

REINTEGRO
PROGRAM
REAL
.
2,186.42 4,341.25
3,626.50 3,876.59
3,167.73 460.89
8,980.64

RECONOC
IDO
4,341.25
3,876.59
460.89

### 8,678.73
IGV 18%

1,562.17

TOTAL A PAGAR POR REAJUSTES10,240.90

RESUMEN DE VALORIZACINES REJUSTADAS POR FORMU


Obra
Cliente
Contratista

No.

DESCRIPCION

PRESUPUESTO GENERAL
1
Valorizac. 01 - Julio 2014
2
Valorizac. 02- Agosto 2014
3
Valorizac. 03- Setiembre 2014
MONTO TOTAL

"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE A


MUZGA, DISTRITO DE PACCHO, PROVINICIA DE HUAURA" META 02
MUNICIPALIDAD PROVINCIAL DE HUAURA
CONSORCIO VIRGEN DEL CARMEN
MONTO
BRUTO
(S/.)
188,750.15
161,524.78
17,726.47
368,001.40

REAJUSTES
PPTO
PRINCIP.
4,341.25
3,876.59
460.89
8,678.73

ADELANT
N
O
ADELANTO
DIRECTO DIRECTO
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

AMORT.
ADEL.
MAT.
0.00
0.00
0.00
0.00

AS POR FORMULA POLINOMICA

DEL SISTEMA DE ALCANTARILLADO DE LA COMUNIDAD DE


HUAURA" META 02: INSTALACIN DE AGUA POTABLE"

DEDUCCION INTERES
ADEL.
RETRASO
MAT.
PAGO
VAL.
0.00
0.00
0.00
0.00

0.00

SUB TOTAL
(S/.)
193,091.40
165,401.37
18,187.36
376,680.13

IGV
(S/.)
34,756.45
29,772.25
3,273.72
67,802.42

VALORIZACION
ES
RECALCULADAS
227,847.85
195,173.62
21,461.08
444,482.55

DETRACCION Y RETENC

Obra:
"MEJORAMIENTO DE AGUA POTABLE E INSTALACIN DEL SISTEMA DE ALCANTARILLADO D
PROVINICIA DE HUAURA" META 02: INSTALACIN DE

DESCRIPCION

MONTO VALORIZADO (S/.)


PARCIAL

IGV

TOTAL

FACTURA EMITIDA
N

TOTAL (S/.) N C.P.

1 Valorizac. 01 - Julio 2014

188,750.15

33,975.03

222,725.18 000122

222,725.18 5477

2 Valorizac. 02- Agosto 201

161,524.78

29,074.46

190,599.24 000123

190,599.24 6157

17,726.47
368,001.40

3,190.76
66,240.25

20,917.23 000126
434,241.65

20,917.23 6853
434,241.65

3 Valorizac. 03- Setiembre


TOTAL S/.

MONTO TOTAL VALORIZADO


MONTO TOTAL FACTURADO
MONTO TOTAL PAGADO
RETENCION POR GARANTIA FIEL
CUMPLIMIENTO - 10 %

S/. 434,241.65
S/. 434,241.65
S/. 390,817.48
S/. 43,424.17

PAG

N Y RETENCIONES

DE ALCANTARILLADO DE LA COMUNIDAD DE MUZGA, DISTRITO DE PACCHO,


A 02: INSTALACIN DE AGUA POTABLE"

PAGO NETO
MONTO

DETRACCIONES (4%) - IGV


FECHA N C.P.

MONTO

FECHA

DEL ADELANTO
RETENCION
DE
GARANTIA FIEL
MATERIALES
CUMPLIMIENTO
(40%)
(10%)
MONTO FECHA

MONTO

FECHA

192,104.10 8/19/2014 5478

8,909.00 19/0872014

21,712.08

161,263.18 9/12/2014 6158

7,623.97 9/12/2014

21,712.09

20,080.54 10/6/2014 6854


373,447.82

836.69 10/6/2014
17,369.66

0.00
43,424.17

0.00

CUADRO INFORMATIVO DE LA VALORIZACIN N 01


VALORIZADO
DESCRIPCIN
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (8%)
SUB TOTAL
IGV (18%)
TOTAL
FACTOR DE RELACION
TOTAL VALORIZADO
% DE AVANCE

PAGADO
COSTO
MONTO VALORIZADO SIN IGV
159,957.75 AMORTIZACIN
15,995.78 VALORIZACIN NETA
12,796.62 IGV (18%)
188,750.15 DETRACCION (4%)
33,975.03 RETENCIN: GARANTA FIEL CUMPLIMIENTO
S/. 222,725.18 MONTO PAGADO
1.00
PERIODO
MONTO PAGADO
S/. 222,725.18
51.29% 14/07/2014 -31/07/2014
S/. 192,104.10

CUADRO INFORMATIVO DE LA VALORIZACIN N 02


VALORIZADO
DESCRIPCIN
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (8%)
SUB TOTAL
IGV (18%)
TOTAL
FACTOR DE RELACION
TOTAL VALORIZADO
% DE AVANCE

PAGADO
COSTO
MONTO VALORIZADO SIN IGV
136,885.41 AMORTIZACIN
13,688.54 VALORIZACIN NETA
10,950.83 IGV (18%)
161,524.78 DETRACCION (4%)
29,074.46 RETENCIN: GARANTA FIEL CUMPLIMIENTO
S/. 190,599.24 MONTO PAGADO
1.00
PERIODO
MONTO PAGADO
S/. 190,599.24
43.89% 01/08/2014 -31/08/2014
S/. 161,263.18

CUADRO INFORMATIVO DE LA VALORIZACIN N 03


VALORIZADO
DESCRIPCIN
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (8%)
SUB TOTAL
IGV (18%)
TOTAL
FACTOR DE RELACION
TOTAL VALORIZADO
% DE AVANCE

PAGADO
COSTO
MONTO VALORIZADO SIN IGV
15,022.43 AMORTIZACIN
1,502.24 VALORIZACIN NETA
1,201.79 IGV (18%)
17,726.46 DETRACCION (4%)
3,190.76 RETENCIN: GARANTA FIEL CUMPLIMIENTO
S/. 20,917.23 MONTO PAGADO
1.00
PERIODO
MONTO PAGADO
S/. 20,917.23
4.82% 01/09/2014 - 04/09/2014
S/. 20,080.54

ADO
188,750.15
0.00
188,750.15
33,975.03
8,909.00
21,712.08
192,104.100
COMPROBANTE
DE PAGO N
5477

ADO
161,524.78
0.00
161,524.78
29,074.46
7,623.97
21,712.09
161,263.18
COMPROBANTE
DE PAGO N
6157

ADO
17,726.46
0.00
17,726.46
3,190.76
836.69
0.00
20,080.54
COMPROBANTE
DE PAGO N
6853

S-ar putea să vă placă și