Documente Academic
Documente Profesional
Documente Cultură
4
Name of the Office :
Date:
Name of the System Administrator:
Please follow the steps mentioned below in the same sequential order:
Sl.
No
.
2
3
4
5
6
7
8
9
Activity
Wheth
er
done
succes
s fully
(Y/N)
Signature of
Note:
1 Offices which are non-ePayment offices or offices which do not have Meghdoot Point
of Sale installed in their office environment may ignore the errors generated during
execution of the following scripts:
a POSPCC_COD_20032016.exl (In case your office is not an ePayment office).
2 BNPL Offices may face Time-out expired issues during execution of two scripts viz.,
SP_V44_Billing_POSPCC20032016.exl
and
SP_V44_Billing_POSPCCBACKUP20032016.exl due to the reason that all the articles
need to get updated with the booking date. Successful execution of these 2 scripts
is a mandatory requirement else these offices will face problems with bill generation
as well as view/print of Bulk Customer reports for dates prior to upgradation to
Speednet 4.4. Hence, all BNPL offices are to report any issues relating to proper
execution of the DB Scripts and get them resolved before the next bill generation.