ANALYSIS AND

DESIGN OF A R.C.C. BUILDING FRAME ATRUCTURE

Site location:
DG Khan

Building title:
Marriage Hall

Data used:
ABCSOIL

= 1ton per square foot

Unit weights:
Soil

= 120pcf

R.C.C.

= 150pcf

Brick ballast

= 110pcf

P.C.C+terrazzo

= 144pcf

Mud filling

= 100pcf

Brick tiles

= 120pcf

C/S mortar

= 120pcf

Wall loads:
1foot high 9inch wide = 90 lbs per foot
Live loads:
LL

= 150psf (for slabs, beams etc.)

LL

= 200psf (for stairs)

fc

= 3ksi (for slabs and beams)

Material strength:

= 4ksi ( for basement and columns)


fy

= 60ksi (deformed steel bars)

Page 1 of 85

Fig 1: Plan of building

DESIGN OF SLABS

Page 2 of 85

Page 3 of 85

Page 4 of 85

Page 5 of 85

Page 6 of 85

Page 7 of 85

Page 8 of 85

Page 9 of 85

Page 10 of 85

Page 11 of 85

Page 12 of 85

Page 13 of 85

Page 14 of 85

Page 15 of 85

DESIGN OF BEAMS
Roof Slab Beams Design
Design of B1:
Factored moments taken from ETABS:
Exterior support Mu

= 35.02 k-ft

Exterior span Mu

= 10.27 k-ft

Interior support Mu

= 136.8 k-ft

Interior span Mu

= 135.4 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=
=

Interior Span

l
18.5

h=

15 12
= 9.729in
18.5

l
21
30 12
= 17.143in
21

Say, h = 18in to keep the deflections in control.


Width of web:

bw

= 9in

d min for Mumax :

d min

hmin
Thus,

Mumax
0.205 fc ' b

136.8 12
17.22in
0.205 3 9

= 17.22 + 2.5 = 19.72in


h 22in
d 22 2.5 19.5in

Page 16 of 85

Maximum capacity as singly reinforced section at supports:

max

2 fc '
= 0.851
= 0.0103
7 fy
=

AS 1

max bd

= 0.0103 9 19.5 1.807in 2


=

b Mn

AS 1 f y
0.85 fc 'b

1.807 60
= 4.725in
0.85 3 9

a
= b AS 1 f y (d )
2

0.9(1.807)(60)(19.5
=

12

4.725
)
2
= 139.35 k-ft

b Mn = 139.35 k-ft
Effective flange width for L-beam behavior:

bf

is lesser of the following:


15 12
15in for exterior span
12
30 12
=
30in for interior span
12

i)

l
12

ii)

6h f bw

= 6 (7)+9 = 51in

iii)

bw

Thus,

Sc
2

=9+

bf

13.5 12
= 90in
2

= 15in for exterior span


= 30in for interior span

Maximum capacity as singly reinforced section in spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd
Page 17 of 85

= 0.0135 9 19.5 2.369in 2


=

AS 1 f y
0.85 fc 'b

2.369 60
= 1.858in
0.85 3 30

a
= b AS 1 f y (d )
2

b Mn

0.9(2.369)(60)(19.5
=

12

1.858
)
2 = 197.97 k-ft

b Mn = 197.97 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 9 19.5 0.585in 2

200
200

0.0033
fy
60000

Design for positive moment in exterior span:

Assume,

Mu

= 10.27 k-ft

= 3in

As

Mu

a
2

b f y (d )
=

Thus,

As

10.27 12
3
0.9(60)(19.5 )
2

= 0.126in 2 Asmin

= 0.585in 2

Use,

2 - #6.

Design for positive moment in interior span:

Assume,

Mu

= 135.4 k-ft

= 3in

Page 18 of 85

As

Mu

a
2

b f y (d )
=

135.4 12
3
0.9(60)(19.5 )
2

AS f y
0.85 fc 'b

= 1.671in 2

1.671 60
= 1.31in
0.85 3 30

(Assumption is correct)
As

135.4 12
= 1.596in 2
1.31
0.9(60)(19.5
)
2

Use,

2 - #8 + 1-#6

Design for negative moment at exterior support:


Mu

= 35.02 k-ft

Flange is under tension:

Thus,

= 9in

= 19.5in

= 0.0027 <

As

= 0.585in 2

Use,

Mu 35.02 12
=
0.1227
bd 2
9(19.5) 2

min

2 - #6.

Design for negative moment at interior support:


Mu

= 136.8 k-ft < b Mn = 139.35 k-ft

(OK)

Flange is under tension:


b

= 9in

Page 19 of 85

Thus,

= 19.5in

= 0.0102 > min

As

= 0.0102 9 19.5 1.79in 2

Use,

Mu 136.8 12
=
0.4797
bd 2
9(19.5) 2

(OK)

2 - #8 + 1- #6

Design for Shear:


Provide:
i) #3@6 " c/c utpo

l
from both supports.
3

ii) #3@9 " c/c in remaining middle portion.

Design of B2:
Factored moments taken from ETABS:
Exterior support Mu

= 27.35 k-ft

Exterior span Mu

= 20.1 k-ft

First Interior support Mu

= 17.1 k-ft

Interior support Mu

= 20.34 k-ft

Interior span Mu

= 15.5 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=
=

Interior Span

l
18.5

h=

13.5 12
= 8.756in
18.5

l
21
13.5 12
= 7.14in
21

Say, h = 9in to keep the deflections in control.


Width of web:

bw

= 9in

d min for Mumax :


Page 20 of 85

d min

hmin

Mumax
0.205 fc ' b

27.35 12
7.7in
0.205 3 9

= 7.7 + 2.5 = 10.2in

Thus,

h 16in
d 16 2.5 13.5in

Maximum capacity as singly reinforced section at supports:

max

2 fc '
= 0.851
= 0.0103
7 fy
=

AS 1

max bd

= 0.0103 9 13.5 1.25in 2


=

b Mn

AS 1 f y
0.85 fc 'b

1.25 60
= 3.268in
0.85 3 9

a
= b AS 1 f y (d )
2

0.9(1.25)(60)(13.5
=

12

3.27
)
2 = 66.74 k-ft

b Mn = 66.74 k-ft
Effective flange width for L-beam behavior:

bf

is lesser of the following:


13.5 12
13.5in
12

i)

l
12

ii)

6h f bw

= 6 (7)+9 = 51in

Page 21 of 85

iii)

bw

Sc
2

=9+

bf

Thus,

13.5 12
= 90in
2

= 13.5in

Maximum capacity as singly reinforced section in spans:

max

3 fc '
= 0.851
= 0.0135
8 fy
=

AS 1

max bd

= 0.0135 9 13.5 1.64in 2


=

AS 1 f y
0.85 fc 'b

1.64 60
= 2.86in
0.85 3 13.5

a
= b AS 1 f y (d )
2

b Mn

0.9(1.64)(60)(13.5
=

12

2.86
)
2 = 89.1 k-ft

b Mn = 89.1 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 9 13.5 0.401in 2

200
200

0.0033
fy
60000

Design for positive moment in exterior span:

Assume,

Mu

= 20.1 k-ft

= 3in

As

Mu
a
2

b f y (d )

Page 22 of 85

Thus,

20.1 12
3
0.9(60)(13.5 )
2

= 0.372in 2 Asmin

= 0.401in 2

As
Use,

2 - #6.

Design for positive moment in interior span:


Mu

= 15.5 k-ft

Use,

2 - #6

Design for negative moment at exterior support:


Mu

= 27.35 k-ft < b Mn = 66.74 k-ft

(OK)

Flange is under tension:

Thus,

= 9in

= 13.5in

= 0.0039 > min

As

= 0.0039 9 13.5 .474in 2

Use,

Mu 27.35 12
=
0.20
bd 2
9(13.5) 2

(OK)

2 - #6

Design for negative moment at interior supports:


Mu

Use,

= 20.34 k-ft < b Mn = 66.74 k-ft

(OK)

2 - #6

Design for Shear:


Provide:
i) #3@7 " c/c utpo

l
from both supports.
3

ii) #3@10 " c/c in remaining middle portion.

Page 23 of 85

Design of B3:
Factored moments taken from ETABS:
Exterior support Mu

= 65.1 k-ft

Exterior span Mu

= 9.18 k-ft

Interior support Mu

= 187.2 k-ft

Interior span Mu

= 221.44 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=
=

Interior Span

l
18.5

h=

15 12
= 9.729in
18.5

l
21
30 12
= 17.143in
21

Say, h = 18in to keep the deflections in control.


Width of web:

bw

= 12in

d min for Mumax :

d min

hmin
Thus,

Mumax
0.205 fc ' b

221.44 12
18.975in
0.205 3 12

= 18.97 + 2.5 = 21.47in


h 22in
d 22 2.5 19.5in

Maximum capacity as singly reinforced section at supports:

Page 24 of 85

max

2 fc '
= 0.851
= 0.0103
7 fy
=

AS 1

max bd

= 0.0103 12 19.5 2.41in 2


=

AS 1 f y
0.85 fc 'b

2.41 60
= 4.725in
0.85 3 12

a
= b AS 1 f y (d )
2

b Mn

0.9(2.41)(60)(19.5
=

12

4.725
)
2
= 185.86 k-ft

b Mn = 185.86 k-ft
Effective flange width for T-beam behavior:

bf

is lesser of the following:


15 12
45in for exterior span
4
30 12
=
90in for interior span
4

i)

l
4

ii)

16h f bw

= 16 (7)+12 = 124in

iii)

Thus,

= 13.5 12 = 162in

bf

= 45in for exterior span


= 90in for interior span

Maximum capacity as singly reinforced section in interior spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd

= 0.0135 12 19.5 3.16in 2


Page 25 of 85

b Mn

AS 1 f y
0.85 fc 'b

3.16 60
= 0.826in
0.85 3 90

a
= b AS 1 f y (d )
2

0.9(3.16)(60)(19.5
=

12

0.826
)
2 = 271.42 k-ft

b Mn = 271.42 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 12 19.5 0.772in 2

200
200

0.0033
fy
60000

Design for positive moment in exterior span:

Assume,

Mu

= 9.18 k-ft

= 3in

As

Mu

a
2

b f y (d )
=

Thus,

As

9.18 12
3
0.9(60)(19.5 )
2

= 0.113in 2 Asmin

= 0.772in 2

Use,

2 - #6.

Design for positive moment in interior span:

Assume,

Mu

= 221.44 k-ft

= 3in

As

Mu
a
2

b f y (d )

Page 26 of 85

221.44 12
3
0.9(60)(19.5 )
2

AS f y
0.85 fc 'b

= 2.734in 2

2.734 60
= 0.715in
0.85 3 90

(Assumption is correct)
As

221.44 12
= 2.57in 2
0.715
0.9(60)(19.5
)
2

Use,

4 - #8

Design for negative moment at exterior support:


Mu

= 65.1 k-ft

Flange is under tension:

Thus,

= 12in

= 19.5in

= 0.0033 =

As

= 0.772in 2

Use,

65.112
Mu
=
0.171
2
bd
12(19.5) 2

min

2 - #6.

Design for negative moment at interior support:


Mu

= 187.2 k-ft > b Mn = 185.86 k-ft

Design as doubly reinforced section of size 12in22in.


d'

= 2.5in

= 19.5in

M2

= Mu b Mn = 1.6k-ft

Page 27 of 85

Assuming compression steel is yielding:

M2
1.6 12
=
= 0.021in 2
0.9 f y ( d d ') 0.9(60)(19.5 2.5)

AS 2

fs '

= As2

fy

fs '

87(4.725 0.85 2.5)


4.725

= 47.87 ksi < f y

As2revised
Thus,

As

= As2

fy
fs '

= 0.021

As2revised = 2.41+ 0.026 = 2.44 in 2

= As1 +

Use,

60
= 0.026 in 2
47.87

2 - #8 + 2 - #6 (Top bars)
2 - #6 ( Bottom bars)

Design for Shear:


Provide:
i) #3@5 " c/c utpo

l
from both supports.
3

ii) #3@8 " c/c in remaining middle portion.

Design of B4:
Factored moments taken from ETABS:
Exterior support Mu

= 15.75 k-ft

Exterior span Mu

= 43.1 k-ft

Interior support Mu

= 197.01 k-ft

Interior span Mu

= 170.6 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=

l
18.5

Interior Span
h=

l
21

Page 28 of 85

15 12
= 9.729in
18.5

30 12
= 17.143in
21

Say, h = 18in to keep the deflections in control.


Width of web:

bw

= 12in

d min for Mumax :

d min

hmin

Mumax
0.205 fc ' b

197.0112
17.898in
0.205 3 12

= 17.898 + 2.5 = 20.398in

Thus,

h 22in
d 22 2.5 19.5in

Maximum capacity as singly reinforced section at supports:

max
AS 1

2 fc '
= 0.851
= 0.0103
7 fy
=

max bd

= 0.0103 12 19.5 2.41in 2


a

b Mn

AS 1 f y
0.85 fc 'b

2.41 60
= 4.725in
0.85 3 12

a
= b AS 1 f y (d )
2

0.9(2.41)(60)(19.5
=

12

4.725
)
2
= 185.86 k-ft

b Mn = 185.86 k-ft
Page 29 of 85

Effective flange width for T-beam behavior:

bf

is lesser of the following:


15 12
45in for exterior span
4
30 12
=
90in for interior span
4

i)

l
4

ii)

16h f bw

= 16 (7)+12 = 124in

iii)

= 13.5 12 = 162in

Thus,

bf

= 45in for exterior span


= 90in for interior span

Maximum capacity as singly reinforced section in interior spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd

= 0.0135 12 19.5 3.16in 2


a

b Mn

AS 1 f y
0.85 fc 'b

3.16 60
= 0.826in
0.85 3 90

a
= b AS 1 f y (d )
2

0.9(3.16)(60)(19.5
=

12

0.826
)
2 = 271.42 k-ft

b Mn = 271.42 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 12 19.5 0.772in 2

200
200

0.0033
fy
60000

Page 30 of 85

Design for positive moment in exterior span:

Assume,

Mu

= 43.1 k-ft

= 3in

As

Mu

a
2

b f y (d )
=

Thus,

As

43.1 12
3
0.9(60)(19.5 )
2

= 0.532in 2 Asmin

= 0.772in 2

Use,

2 - #6.

Design for positive moment in interior span:

Assume,

Mu

= 170.6 k-ft

= 3in

As

Mu
a
2

b f y (d )
=

170.6 12
3
0.9(60)(19.5 )
2

AS f y
0.85 fc 'b

= 2.106in 2

2.106 60
= 0.551in
0.85 3 90

(Assumption is correct)
As

Use,

170.6 12
= 1.972in 2
0.551
0.9(60)(19.5
)
2

3 - #8

Design for negative moment at exterior support:


Mu

= 15.75 k-ft

Flange is under tension:


Page 31 of 85

= 12in

= 19.5in

<

Thus,

Mu 15.75 12
=
0.041
bd 2 12(19.5) 2

min

As

= 0.772in 2

Use,

2 - #6.

Design for negative moment at interior support:


Mu

= 197.01 k-ft > b Mn = 185.86 k-ft

Design as doubly reinforced section of size 12in22in.


d'

= 2.5in

= 19.5in

M2

= Mu b Mn = 11.15k-ft

Assuming compression steel is yielding:

M2
11.15 12
=
= 0.146in 2
0.9 f y ( d d ') 0.9(60)(19.5 2.5)

AS 2

fs '

= As2

fy
fs '

87(4.725 0.85 2.5)


4.725

= 47.87 ksi < f y

As2revised
Thus,

As

= As2

fy
fs '

= As1 +

= 0.146

60
= 0.183 in 2
47.87

As2revised = 2.41+ 0.183 = 2.593 in 2


4 - #8 (Top bars)

Use,

2 - #6 (Bottom bars)

Design for Shear:


Page 32 of 85

Provide:
i) #3@5 " c/c utpo

l
from both supports.
3

ii) #3@8 " c/c in remaining middle portion.

Design of B5:
Factored moments taken from ETABS:
Exterior support Mu

= 214.36 k-ft

Exterior span Mu

= 320.56 k-ft

Interior support Mu

= 306.1 k-ft

Interior span Mu

= 281.9 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=
=

Interior Span

l
18.5

h=

27 12
= 17.51in
18.5

l
21
27 12
= 15.42in
21

Say, h = 18in to keep the deflections in control.


Width of web:

bw

= 15in

d min for Mumax :

d min

hmin
Thus, say

Mumax
0.205 fc ' b

320.56 12
20.42in
0.205 3 15

= 20.42 + 2.5 = 22.92in

h 22in
d 22 2.5 19.5in
Page 33 of 85

Maximum capacity as singly reinforced section at supports:

max

2 fc '
= 0.851
= 0.0103
7 fy
=

AS 1

max bd

= 0.0103 15 19.5 3.013in 2


a

AS 1 f y
0.85 fc 'b

3.013 60
= 4.726in
0.85 3 15

a
= b AS 1 f y (d )
2

b Mn

0.9(3.013)(60)(19.5
=

12

4.726
)
2 = 232.35 k-ft

b Mn = 232.35 k-ft
Effective flange width for T-beam behavior:

b f is lesser of the following:


27 12
81in
4

i)

l
4

ii)

16h f bw

= 16 (7)+12 = 124in

iii)

Thus,

= 13.5 12 = 162in

bf

= 81in

Maximum capacity as singly reinforced section in interior spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd

= 0.0135 15 19.5 3.948in 2


a

AS 1 f y
0.85 fc 'b

3.948 60
= 1.1467in
0.85 3 81
Page 34 of 85

a
= b AS 1 f y (d )
2

b Mn

0.9(3.948)(60)(19.5
=

12

1.147
)
2 = 336.248 k-ft

b Mn = 336.248 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 15 19.5 0.965in 2

200
200

0.0033
fy
60000

Design for positive moment in exterior span:

Assume,

Mu

= 320.56 k-ft

= 3in

As

Mu
a
2

b f y (d )
320.56 12
3
0.9(60)(19.5 )
2

AS f y
0.85 fc 'b

= 3.9572in2 Asmin

(OK)

3.957 60
= 1.149in
0.85 3 81

(Assumption is correct)

Thus,

320.56 12
1.149
0.9(60)(19.5
)
2

As

As

= 3.764in 2

Use,

5- #8.

Design for positive moment in interior span:

Page 35 of 85

Assume,

Mu

= 281.9 k-ft

= 3in

As

Mu
a
2

b f y (d )
281.9 12
3
0.9(60)(19.5 )
2

AS f y
0.85 fc 'b

= 3.48in 2

3.48 60
= 1.01in
0.85 3 81

(Assumption is correct)
As

281.9 12
= 3.298in 2
1.01
0.9(60)(19.5
)
2

Use,

5 - #8

Design for negative moment at exterior support:


Mu

= 214.36 k-ft

Flange is under tension:

Thus,
Use,

= 15in

= 19.5in

= 0.0094 > min

As

= 0.0094 15 19.5 2.75in 2

Mu 214.36 12
=
0.451
bd 2
15(19.5) 2

(OK)

4 - #8

Design for negative moment at interior support:


Mu

= 306.1k-ft > b Mn = 232.35 k-ft

Page 36 of 85

Design as doubly reinforced section of size 15in22in.


d'

= 2.5in

= 19.5in

M2

= Mu b Mn = 73.75k-ft

Assuming compression steel is yielding:

M2
73.75 12
=
= 0.964in 2
0.9 f y ( d d ') 0.9(60)(19.5 2.5)

AS 2

fs '

= As2

fy
fs '

87(4.726 0.85 2.5)


4.726

= 47.88 ksi < f y

As2revised
Thus,

= As2

fy
fs '

= As1 +

As

= 0.964

60
= 1.21 in 2
47.88

As2revised = 3.013+ 1.21 = 4.22 in 2

4 - #8 + 3 - #6 (Top bars)

Use,

2 - #8 (Bottom bars)

Design for Shear:


Provide:
i) #3@4 " c/c utpo

l
from both supports.
3

ii) #3@7 " c/c in remaining middle portion.

Ground,1st & 2nd Slab Beams Design


Design of B1:
Factored moments taken from ETABS:
Exterior support Mu

= 64.56 k-ft

Exterior span Mu

= 28.73 k-ft

Interior support Mu

= 248.41 k-ft
Page 37 of 85

Interior span Mu

= 203.66 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=
=

Interior Span

l
18.5

h=

15 12
= 9.729in
18.5

l
21
30 12
= 17.143in
21

Say, h = 18in to keep the deflections in control.


Width of web:

bw

= 9in

d min for Mumax :

d min

hmin

Mumax
0.205 fc ' b

248.4112
23.2in
0.205 3 9

= 23.2 + 2.5 = 25.71in

Thus,

h 25in
d 25 2.5 22.5in

Maximum capacity as singly reinforced section at supports:

max
AS 1

2 fc '
= 0.851
= 0.0103
7 fy
=

max bd

= 0.0103 9 22.5 2.086in 2


a

AS 1 f y
0.85 fc 'b

2.086 60
= 5.454in
0.85 3 9
Page 38 of 85

b Mn

a
= b AS 1 f y (d )
2

0.9(2.086)(60)(22.5

12

5.454
)
2
= 185.61 k-ft

b Mn = 185.61 k-ft
Effective flange width for L-beam behavior:

bf

is lesser of the following:


15 12
15in for exterior span
12
30 12
=
30in for interior span
12

iv)

l
12

v)

6h f bw

= 6 (7)+9 = 51in

vi)

bw

Thus,

Sc
2

=9+

bf

13.5 12
= 90in
2

= 15in for exterior span


= 30in for interior span

Maximum capacity as singly reinforced section in spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd

= 0.0135 9 22.5 2.734in 2


a

b Mn

AS 1 f y
0.85 fc 'b

2.734 60
= 2.144in
0.85 3 30

a
= b AS 1 f y (d )
2

0.9(2.734)(60)(22.5

12

2.144
)
2 = 263.63 k-ft
Page 39 of 85

b Mn = 263.63 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 9 22.5 0.668in 2

200
200

0.0033
fy
60000

Design for positive moment in exterior span:`

Assume,

Mu

= 28.73 k-ft

= 3in

As

Mu

a
2

b f y (d )
=

Thus,

As

28.73 12
3
0.9(60)(22.5 )
2

= 0.304in 2 Asmin

= 0.668in 2

Use,

2 - #6.

Design for positive moment in interior span:

Assume,

Mu

= 203.66 k-ft

= 3in

As

Mu
a
2

b f y (d )
=

203.66 12
3
0.9(60)(22.5 )
2

AS f y
0.85 fc 'b

= 2.155in 2

2.155 60
= 1.69in
0.85 3 30

(Assumption is correct)

Page 40 of 85

As

203.66 12
= 2.1in 2
1.69
0.9(60)(22.5
)
2

Use,

3 - #8

Design for negative moment at exterior support:


Mu

= 64.56 k-ft

Flange is under tension:

Thus,

= 9in

= 22.5in

= 0.0033 =

As

= 0.668in 2

Use,

Mu 64.56 12
=
0.17
bd 2
9(22.5) 2

min

2 - #6.

Design for negative moment at interior support:


Mu

= 248.41 k-ft > b Mn = 185.61 k-ft

Design as doubly reinforced section of size 9in25in.


d'

= 2.5in

= 22.5in

M2

= Mu b Mn = 62.8k-ft

Assuming compression steel is yielding:

M2
62.8 12
=
= 0.698in 2
0.9 f y ( d d ') 0.9(60)(22.5 2.5)

AS 2

fs '

= As2

fy
fs '

87(5.454 0.85 2.5)


5.454

= 53.14 ksi < f y


Page 41 of 85

As2revised
Thus,

= As2

fy
fs '

= 0.698

= As1 +

As
Use,

60
= 0.788 in 2
53.14

As2revised = 2.086+ 0.788 = 2.874 in 2

4 - #8 (Top bars)
2 - #6 ( Bottom bars)

Design for Shear:


Provide:
i) #3@6 " c/c utpo

l
from both supports.
3

ii) #3@9 " c/c in remaining middle portion.

Design of B2:
Factored moments taken from ETABS:
Exterior support Mu

= 43.04 k-ft

Exterior span Mu

= 27.18 k-ft

First Interior support Mu

= 36.9 k-ft

Interior support Mu

= 39.83 k-ft

Interior span Mu

= 22.51 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=
=

Interior Span

l
18.5

h=

13.5 12
= 8.756in
18.5

l
21
13.5 12
= 7.14in
21

Say, h = 9in to keep the deflections in control.


Width of web:

bw

= 9in

d min for Mumax :


Page 42 of 85

d min

hmin

Mumax
0.205 fc ' b

43.04 12
9.66in
0.205 3 9

= 9.66 + 2.5 = 12.16in

Thus,

h 16in
d 16 2.5 13.5in

Maximum capacity as singly reinforced section at supports:

max
AS 1

2 fc '
= 0.851
= 0.0103
7 fy
=

max bd

= 0.0103 9 13.5 1.25in 2


=

b Mn

AS 1 f y
0.85 fc 'b

1.25 60
= 3.268in
0.85 3 9

a
= b AS 1 f y (d )
2

0.9(1.25)(60)(13.5
=

12

3.27
)
2 = 66.74 k-ft

b Mn = 66.74 k-ft
Effective flange width for L-beam behavior:

bf

is lesser of the following:


13.5 12
13.5in
12

iv)

l
12

v)

6h f bw

= 6 (7)+9 = 51in

Page 43 of 85

vi)

bw

Sc
2

bf

Thus,

=9+

13.5 12
= 90in
2

= 13.5in

Maximum capacity as singly reinforced section in spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd

= 0.0135 9 13.5 1.64in 2


=

AS 1 f y
0.85 fc 'b

1.64 60
= 2.86in
0.85 3 13.5

a
= b AS 1 f y (d )
2

b Mn

0.9(1.64)(60)(13.5

12

2.86
)
2 = 89.1 k-ft

b Mn = 89.1 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 9 13.5 0.401in 2

200
200

0.0033
fy
60000

Design for positive moment in exterior span:

Assume,

Mu

= 27.18 k-ft

= 3in

As

Mu
a
2

b f y (d )

Page 44 of 85

Thus,

27.18 12
3
0.9(60)(13.5 )
2

= 0.503in 2 Asmin

(OK)

= 0.503in 2

As
Use,

2 - #6.

Design for positive moment in interior span:


Mu

= 22.51 k-ft

Use,

2 - #6

Design for negative moment at exterior support:


Mu

= 43.04 k-ft < b Mn = 66.74 k-ft

(OK)

Flange is under tension:

Thus,

= 9in

= 13.5in

= 0.0064 > min

As

= 0.0064 9 13.5 .777in 2

Use,

Mu 43.04 12
0.315
=
bd 2
9(13.5) 2

(OK)

2 - #6

Design for negative moment at interior supports:


Mu

Use,

= 36.9 k-ft < b Mn = 66.74 k-ft

(OK)

2 - #6

Design for Shear:


Provide:
i) #3@7 " c/c utpo

l
from both supports.
3

ii) #3@10 " c/c in remaining middle portion.

Page 45 of 85

Design of B3:
Factored moments taken from ETABS:
Exterior support Mu

= 129.1 k-ft

Exterior span Mu

= 3.73 k-ft

Interior support Mu

= 303.79 k-ft

Interior span Mu

= 345.35 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=
=

Interior Span

l
18.5

h=

15 12
= 9.729in
18.5

l
21
30 12
= 17.143in
21

Say, h = 18in to keep the deflections in control.


Width of web:

bw

= 12in

d min for Mumax :

d min

hmin
Thus,

Mumax
0.205 fc ' b

345.35 12
23.7in
0.205 3 12

= 23.7 + 2.5 = 26.2in


h 25in
d 25 2.5 22.5in

Maximum capacity as singly reinforced section at supports:

max

2 fc '
= 0.851
= 0.0103
7 fy
Page 46 of 85

AS 1

max bd

= 0.0103 12 22.5 2.781in 2


=

AS 1 f y
0.85 fc 'b

2.781 60
= 5.453in
0.85 3 12

a
= b AS 1 f y (d )
2

b Mn

0.9(2.781)(60)(22.5

12

5.453
)
2
= 247.46 k-ft

b Mn = 247.46 k-ft
Effective flange width for T-beam behavior:

bf

is lesser of the following:


15 12
45in for exterior span
4
30 12
90in for interior span
=
4

iv)

l
4

v)

16h f bw

= 16 (7)+12 = 124in

vi)

Thus,

= 13.5 12 = 162in

bf

= 45in for exterior span


= 90in for interior span

Maximum capacity as singly reinforced section in interior spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd

= 0.0135 12 22.5 3.645in 2


a

AS 1 f y
0.85 fc 'b

3.645 60
= 0.953in
0.85 3 90
Page 47 of 85

b Mn

a
= b AS 1 f y (d )
2

0.9(3.645)(60)(22.5

12

0.953
)
2 = 361.24 k-ft

b Mn = 361.24 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 12 19.5 0.772in 2

200
200

0.0033
fy
60000

Design for positive moment in exterior span:

Assume,

Mu

= 3.73 k-ft

= 3in

As

Mu

a
2

b f y (d )
=

Thus,

As

3.73 12
3
0.9(60)(22.5 )
2

= 0.039in 2 Asmin

= 0.772in 2

Use,

2 - #6.

Design for positive moment in interior span:

Assume,

Mu

= 345.35 k-ft

= 3in

As

Mu
a
2

b f y (d )

Page 48 of 85

345.35 12
3
0.9(60)(22.5 )
2

AS f y
0.85 fc 'b

= 3.654in 2

3.654 60
= 0.955in
0.85 3 90

(Assumption is correct)
As

345.35 12
= 3.484in 2
0.955
0.9(60)(22.5
)
2

Use,

3 - #8 + 3 - #6

Design for negative moment at exterior support:


Mu

= 129.1 k-ft

Flange is under tension:

Thus,

= 12in

= 22.5in

= 0.0051 >

As

= 0.0051 12 22.5 1.377in 2

Use,

Mu 129.112
0.255
=
bd 2 12(22.5) 2

min

(OK)

2 - #8.

Design for negative moment at interior support:


Mu

= 303.79 k-ft > b Mn = 247.46 k-ft

Design as doubly reinforced section of size 12in25in.


d'

= 2.5in

= 22.5in

M2

= Mu b Mn = 56.33k-ft

Page 49 of 85

Assuming compression steel is yielding:

M2
56.33 12
=
= 0.626in 2
0.9 f y ( d d ') 0.9(60)(22.5 2.5)

AS 2

fs '

= As2

fy
fs '

87(5.453 0.85 2.5)


5.453

= 53.09 ksi < f y

As2revised
Thus,

As

= As2

fy
fs '

60
= 0.707 in 2
53.096

As2revised = 2.781+ 0.707 = 3.488 in 2

= As1 +

Use,

= 0.626

3 - #8 + 3 - #6 (Top bars)
2 - #6 ( Bottom bars)

Design for Shear:


Provide:
i) #3@5 " c/c utpo

l
from both supports.
3

ii) #3@8 " c/c in remaining middle portion.

Design of B4:
Factored moments taken from ETABS:
Exterior support Mu

= 50 k-ft

Exterior span Mu

= 70 k-ft

Interior support Mu

= 340.21 k-ft

Interior span Mu

= 258.8 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=

l
18.5

Interior Span
h=

l
21

Page 50 of 85

15 12
= 9.729in
18.5

30 12
= 17.143in
21

Say, h = 18in to keep the deflections in control.


Width of web:

bw

= 12in

d min for Mumax :

d min

hmin

Mumax
0.205 fc ' b

339.84 12
23.5in
0.205 3 12

= 23.5 + 2.5 = 26in

Thus,

h 25in

d 25 2.5 22.5in

Maximum capacity as singly reinforced section at supports:

max
AS 1

2 fc '
= 0.851
= 0.0103
7 fy
=

max bd

= 0.0103 12 22.5 2.781in 2


a

b Mn

AS 1 f y
0.85 fc 'b

2.781 60
= 5.453in
0.85 3 12

a
= b AS 1 f y (d )
2

0.9(2.781)(60)(22.5

12

5.453
)
2
= 247.46 k-ft

b Mn = 247.46 k-ft
Page 51 of 85

Effective flange width for T-beam behavior:

bf

is lesser of the following:


15 12
45in for exterior span
4
30 12
=
90in for interior span
4

i)

l
4

ii)

16h f bw

= 16 (7)+12 = 124in

iii)

Thus,

= 13.5 12 = 162in

bf

= 45in for exterior span


= 90in for interior span

Maximum capacity as singly reinforced section in interior spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd

= 0.0135 12 22.5 3.645in 2


=

b Mn

AS 1 f y
0.85 fc 'b

3.645 60
= 0.953in
0.85 3 90

a
= b AS 1 f y (d )
2

0.9(3.645)(60)(22.5

12

0.953
)
2 = 361.24 k-ft

b Mn = 361.24 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 12 19.5 0.772in 2

200
200

0.0033
fy
60000

Page 52 of 85

Design for positive moment in exterior span:

Assume,

Mu

= 70 k-ft

= 3in

As

Mu

a
2

b f y (d )
=

Thus,

As

70 12
3
0.9(60)(22.5 )
2

= 0.741in2 Asmin

= 0.772in 2

Use,

2 - #6.

Design for positive moment in interior span:

Assume,

Mu

= 258.8 k-ft

= 3in

As

Mu
a
2

b f y (d )
=

258.8 12
3
0.9(60)(22.5 )
2

AS f y
0.85 fc 'b

= 2.74in 2

2.74 60
= 0.716in
0.85 3 90

(Assumption is correct)
As

258.8 12
= 2.6in 2
0.716
0.9(60)(22.5
)
2

Use,

4 - #8

Design for negative moment at exterior support:


Mu

= 50 k-ft
Page 53 of 85

Flange is under tension:


b

= 12in

= 22.5in

<

Thus,

As

50 12
Mu
=
0.099
2
bd
12(22.5) 2

min
= 0.772in 2

Use,

2 - #6.

Design for negative moment at interior support:


Mu

= 340.21 k-ft > b Mn = 247.46 k-ft

Design as doubly reinforced section of size 12in25in.


d'

= 2.5in

= 22.5in

M2

= Mu b Mn = 92.75k-ft

Assuming compression steel is yielding:

M2
92.75 12
=
= 1.031in 2
0.9 f y ( d d ') 0.9(60)(22.5 2.5)

AS 2

fs '

= As2

fy
fs '

87(5.453 0.85 2.5)


5.453

= 53.09 ksi < f y

As2revised
Thus,

As
Use,

= As2

fy
fs '

= As1 +

= 1.031

60
= 1.165 in 2
53.096

As2revised = 2.781+ 1.165 = 3.949 in 2

4 - #8 + 2 - #6 (Top bars)
3 - #6 ( Bottom bars)

Page 54 of 85

Design for Shear:


Provide:
i) #3@5 " c/c utpo

l
from both supports.
3

ii) #3@8 " c/c in remaining middle portion.

Design of B5:
Factored moments taken from ETABS:
Exterior support Mu

= 384.46 k-ft

Exterior span Mu

= 504.77 k-ft

Interior support Mu

= 537.13 k-ft

Interior span Mu

= 462.03 k-ft

Minimum Depth of beam for deflection control:


Exterior Span
h=
=

Interior Span

l
18.5

h=

27 12
= 17.51in
18.5

l
21

27 12
= 15.42in
21

Say, h = 18in to keep the deflections in control.


Width of web:

bw

= 18in

d min for Mumax :

d min

hmin
Thus, say

Mumax
0.205 fc ' b

537.13 12
24.13in
0.205 3 18

= 24.13 + 2.5 = 26.63in


h 27in
d 27 2.5 24.5in

Page 55 of 85

Maximum capacity as singly reinforced section at supports:

max
AS 1

2 fc '
= 0.851
= 0.0103
7 fy
=

max bd

= 0.0103 18 24.5 4.54in 2


=

AS 1 f y
0.85 fc 'b

4.54 60
= 5.93in
0.85 3 18

a
= b AS 1 f y (d )
2

b Mn

0.9(4.54)(60)(24.5

12

5.93
)
2 = 439.96 k-ft

b Mn = 439.96 k-ft
Effective flange width for T-beam behavior:

bf

is lesser of the following:


27 12
81in
4

iv)

l
4

v)

16h f bw

= 16 (7)+18 = 130in

vi)

Thus,

= 13.5 12 = 162in

bf

= 81in

Maximum capacity as singly reinforced section in interior spans:

max
AS 1

3 fc '
= 0.851
= 0.0135
8 fy
=

max bd

= 0.0135 18 24.5 5.95in 2


a

AS 1 f y
0.85 fc 'b

5.95 60
= 1.7in
0.85 3 81
Page 56 of 85

a
= b AS 1 f y (d )
2

b Mn

0.9(5.95)(60)(24.5

12

1.7
)
2 = 633.22 k-ft

b Mn = 633.22 k-ft
Minimum steel ratio:

min

Asmin

= 0.0033 18 24.5 1.455in 2

200
200

0.0033
fy
60000

Design for positive moment in exterior span:

Assume,

Mu

= 504.77 k-ft

= 3in

As

Mu
a
2

b f y (d )
=

504.77 12
3
0.9(60)(24.5 )
2

AS f y
0.85 fc 'b

= 4.877in 2 Asmin

(OK)

4.877 60
= 1.42in
0.85 3 81

(Assumption is correct)

Thus,

504.77 12
1.42
0.9(60)(24.5
)
2

As

As

= 4.72in 2

Use,

6- #8.

Design for positive moment in interior span:


Mu

= 462.03 k-ft
Page 57 of 85

Assume,

As

= 3in
Mu

a
2

b f y (d )
=

462.03 12
3
0.9(60)(24.5 )
2

AS f y
0.85 fc 'b

= 4.464in 2 Asmin

(OK)

4.464 60
= 1.3in
0.85 3 81

(Assumption is correct)

Thus,

462.03 12
1.3
0.9(60)(24.5 )
2

As

As

= 4.3in 2

Use,

6- #8.

Design for negative moment at exterior support:


Mu

= 384.46 k-ft

Flange is under tension:

Thus,
Use,

= 18in

= 24.5in

= 0.0089 > min

As

= 0.0089 18 24.5 3.92in 2

Mu 384.46 12
=
0.427
bd 2
18(24.5) 2

(OK)

5 - #8

Design for negative moment at interior support:


Mu

= 537.13k-ft > b Mn = 439.96 k-ft

Page 58 of 85

Design as doubly reinforced section of size 18in27in.


d'

= 2.5in

= 24.5in

M2

= Mu b Mn = 97.17k-ft

Assuming compression steel is yielding:

M2
97.17 12
=
= 0.982in 2
0.9 f y ( d d ') 0.9(60)(24.5 2.5)

AS 2

fs '

= As2

fy
fs '

87(5.93 0.85 2.5)


5.93

= 55.82 ksi < f y

As2revised
Thus,

As

= As2

fy
fs '

= As1 +

= 0.982

60
= 1.05 in 2
55.82

As2revised = 4.54+ 1.05 = 5.6 in 2

6 - #8 + 2 - #6 (Top bars)

Use,

3 - #6 (Bottom bars)

Design for Shear:


Provide:
i) #3@4 " c/c utpo

l
from both supports.
3

ii) #3@7 " c/c in remaining middle portion.

Page 59 of 85

DESIGN OF COLUMNS
Design of C3:
Basement & GF:
Pu

= 1176.8k

Mu x

= 91.27k-ft

Mu y

= 65.56k-ft

Lets design the column by Reciprocal Load Method:

Ag trail =
=

Pu 0.6Mux 0.6Mu y
0.5 fc ' 0.01 f y

1176.8 0.6(91.27 65.56)


488.81in 2
0.5 4 0.01 60

4A

4 488.81
24.95in
3.14

D = 20in

Let assume,
D = 20 in

Let,

15
0.75
20

Ag

= 0.03

Ast

= 0.03 314 9.42in

202 314in 2

D = 20-5=15

Bending about Y-axis:

= 0.7

ex

ex
h

Mu y
Pu

65.56 12
0.67in
1176.8

0.67
0.0335
20

Page 60 of 85

Pnyo
fc ' Ag

1.1

Pno
= 1.26
fc ' Ag

= 1.1 4 314 1381.6k

Pn yo

= 1.26 4 314 1582.56k

Pno

Bending about X-axis:

= 0.7

ey

Mu x 91.27 12
0.93in
=
1176.8
Pu

0.93
0.046
20

ey
h
Pnxo
1.1
fc ' Ag
Pno
= 1.26
fc ' Ag

= 1.1 4 314 1381.6k

Pnxo

= 1.26 4 314 1582.56k

Pno

1
1
1
1

Pn Pnxo Pnyo Pno

2
1

= 8.157 104 k 1
1381.6 1582.56

1
Pn

Pn

= 1225.92k > Pu.

(OK).

Provide 12 - #8 longitudinal bars.

Spiral Reinforcement:
Let the bar used, #3.
Diameter of spiral d sp
Concrete cover

3
in
8

= 2.5in
= 20 2 2.5 = 15in

Diameter of chore
Ag

= 314 in 2

Ach

d ch2

152 176.625in 2
Page 61 of 85

Smax

3
3.14 60
2
d sp f y
8

1.3in
=
Ag
314
1)
0.45d ch fc '(
1) 0.45 15 4(
176.625
Ach

Provide #3 spiral at a pitch of 1inch c/c.

1stF & 2ndF:


Pu

= 527.59k

Mu x

= 187.18k-ft

Mu y

= 154.43k-ft

Lets design the column by Reciprocal Load Method:

Ag trail =
=

Pu 0.6Mux 0.6Mu y
0.5 fc ' 0.01 f y

527.59 0.6(187.18 154.43)


281.75in 2
0.5 4 0.01 60

4A

4 281.75
18.94in
3.14
D = 20in

Let assume,
D = 20 in

Let,

15
0.75
20

Ag

= 0.03

Ast

= 0.03 314 9.42in 2

202 314in 2

D = 20-5=15

Bending about Y-axis:

= 0.7

Page 62 of 85

Pnyo
fc ' Ag

0.7

Pno
= 1.26
fc ' Ag

ex

ex
h

Pu

154.43 12
3.51in
527.59

3.51
0.195
18

= 0.7 4 314 879.2k

Pn yo

Mu y

= 1.26 4 314 1582.56k

Pno

Bending about X-axis:

= 0.7

ey

Mu x 187.18 12
4.26in
=
527.59
Pu

4.26
0.237
18

ey
h
Pnxo
0.63
fc ' Ag
Pno
= 1.34
fc ' Ag

= 0.63 4 314 791.28k

Pnxo

= 1.26 4 314 1582.56k

Pno

1
1
1
1

Pn Pnxo Pnyo Pno

1
Pn

Pn

= 565.2k > Pu.

1
1
1

= 1.769 10 3 k 1
879.2 791.28 1582.56
(OK).

Provide 12 - #8 longitudinal bars.

Spiral Reinforcement:
Let the bar used, #3.
Diameter of spiral d sp
Concrete cover

3
in
8

= 2.5in
Page 63 of 85

= 20 2 2.5 = 15in

Diameter of chore
Ag

= 314 in 2

Ach

Smax

3
3.14 60
2
d sp f y
8

1.3in
=
Ag
314
1)
0.45d ch fc '(
1) 0.45 15 4(
176.625
Ach

d ch2

152 176.625in 2
2

Provide #3 spiral at a pitch of 1inch c/c.

Design of C2:
Pu

= 231.37k

Mu x

= 34.53k-ft

Mu y

= 69.87k-ft

Lets design the column by Reciprocal Load Method:

Ag trail =
=

Pu 0.6Mux 0.6Mu y
0.5 fc ' 0.01 f y

231.37 0.6(34.53 69.87)


113.1in 2
0.5 4 0.01 60

Let, The selected section is 12''15''

Let,

Ag

= 12 15 180in 2

= 0.025

Ast

= 0.025 180 4.5in 2

15in

Bending about Y-axis:

ex

12 2(2.375)
0.604 0.6
12
Mu y
Pu

69.87 12
3.62in
231.37

12in

Page 64 of 85

ex
h

Pnyo

3.62
0.30
12

0.55

Pn yo

= 0.55 4 180 396k

Pno
= 1.19
fc ' Ag

Pno

= 1.19 4 180 856.8k

fc ' Ag

Bending about X-axis:

15 2(2.5)
0.67 0.6
15

ey

Mu x 69.87 12
3.62in
=
231.37
Pu

3.62
0.241
15

ey
h
Pnxo
0.6
fc ' Ag

Pnxo

= 0.6 4 180 432k

Pno
= 1.19
fc ' Ag

Pno

= 1.19 4 180 856.8k

1
1
1
1

Pn Pnxo Pnyo Pno

1
1
1

= 3.673 103 k 1
396 432 856.8

1
Pn

Pn

= 272.26k > Pu.

(OK).

Provide 6 - #8 longitudinal bars.

Lateral ties Reinforcement:


Let the bar used, #3.
Diameter of spiral d sp

3
in
8

Spacing of the ties = least of the:


i)

16 dlb

= 16 1 16in
Page 65 of 85

ii)

48 dtb

iii)
iv)

Least dimension
12in

3
= 48 18in
8
= 12in
= 12in

Provide 2 - #3 spiral at 10inch c/c.

Design of C1:
Basement & GF:
Pu

= 867.67k

Mu x

= 122.39k-ft

Mu y

= 114.18k-ft

Lets design the column by Reciprocal Load Method:

Ag trail =
=

Pu 0.6Mux 0.6Mu y
0.5 fc ' 0.01 f y

867.67 0.6(122.39 114.81)


388.46in 2
0.5 4 0.01 60

Let, The selected section is 15'' 24''

Let,

Ag

= 15 24 360in 2

= 0.025

Ast

= 0.025 360 9in 2

24in

Bending about Y-axis:

x
15in

ex

ex
h

x
X

24 2(2.5)
0.79 0.7
24
Mu y
Pu

114.18 12
1.58in
867.67

1.58
0.065
24

Page 66 of 85

Pnyo
fc ' Ag

0.94

Pno
= 1.2
fc ' Ag

Pn yo

= 0.94 4 360 1353.6k

Pno

= 1.2 4 360 1728k

Bending about X-axis:

15 2(2.5)
0.67 0.6
15

ey

Mu x 122.39 12
1.693in
=
867.67
Pu

1.693
0.071
15

ey
h
Pnxo
0.92
fc ' Ag

Pnxo

= 0.92 4 360 1324.8k

Pno
= 1.18
fc ' Ag

Pno

= 1.18 4 360 1699.2k

1
1
1
1

Pn Pnxo Pnyo Pno

1
1
1

= 9.05110 4 k 1
1324.8 1353.6 1699.2

1
Pn

Pn

= 1104.86k > Pu.

(OK).

Provide 12 - #8 longitudinal bars.

Lateral ties Reinforcement:


Let the bar used, #3.
Diameter of spiral d sp

3
in
8

Spacing of the ties = least of the:


i)

16 dlb

= 16 1 16in

ii)

48 dtb

3
= 48 18in
8
Page 67 of 85

iii)
iv)

Least dimension
12in

= 12in
= 12in

Provide 2 - #3 spiral at 10inch c/c.

1stF & 2ndF:


Pu

= 383.5k

Mu x

= 194.3k-ft

Mu y

= 117.9k-ft

Lets design the column by Reciprocal Load Method:

Ag trail =
=

Pu 0.6Mux 0.6Mu y
0.5 fc ' 0.01 f y

383.5 0.6(194.3 117.9)


219.55in 2
0.5 4 0.01 60

Let, The selected section is 15'' 24''

Let,

Ag

= 15 24 360in 2

= 0.025

Ast

= 0.025 360 9in 2

24in

Bending about Y-axis:

Pnyo
fc ' Ag

0.8

Pno
= 1.2
fc ' Ag

x
15in

ex

ex
h

24 2(2.5)
0.791 0.7
24
Mu y
Pu

117.9 12
3.69in
383.5

3.69
0.154
24

Pn yo

= 0.8 4 360 1152k

Pno

= 1.2 4 360 1728k

Page 68 of 85

Bending about X-axis:

15 2(2.5)
0.67 0.6
15

ey

Mu x 194.3 12
6.1in
=
Pu
383.5

6.1
0.508
12

ey
h
Pnxo
0.32
fc ' Ag

Pnxo

= 0.32 4 360 460.8k

Pno
= 1.2
fc ' Ag

Pno

= 1.2 4 360 1728k

1
1
1
1

Pn Pnxo Pnyo Pno

1
Pn

Pn

= 406.5k > Pu.

1
1
1

= 2.46 10 3 k 1
1152 460.8 1728
(OK).

Provide 12 - #8 longitudinal bars.

Lateral ties Reinforcement:


Let the bar used, #3.
Diameter of spiral d sp

3
in
8

Spacing of the ties = least of the:


i)

16 dlb

ii)

48 dtb

iii)
iv)

Least dimension
12in

= 16 1 16in

3
= 48 18in
8
= 12in
= 12in

Provide 2 - #3 spiral at 10inch c/c.

Page 69 of 85

Design strips

FigA: Column forces at base


Page 70 of 85

Total factored load at the base

Pu = 9918k

Foot print area of the base

A = 62' 83' 5146 ft 2

Ix

1
62 833 2954.23 10 3 ft 4
12

Iy

1
83 623 1648.4 10 3 ft 4
12

Eccentricities of the load Pu :

y'

15(648.7 1176.8 930.5 715.5)

9918x ' = 45(643.9 1163.7 1147.4 867.6)


153.7 226 221.8 221.9


60

223.6 231.4 219.5

x'

313963.5
= 31.65
9918

x'

ex

= 31.65

60
1.65 ft
2

0
13.5(29.9 231.4) 40.5(219.7 221.9)
27(95.5 930.5 1147.4 223.6)

9918 y ' = 54(215.9 1176.8 1163.7 221.8)


67.5(223.13 266)

81(146 648.7 643.9 153.7)

398146.725
=40.14
9918

y'

ey

= 40.14

81
0.356
2

Mu x

= Pu ey = 9918 0.356= 3532.2 k- ft

Mu y

= Pu ex = 9918 1.65 16364.7 k- ft

Page 71 of 85

Pu Mu y x Mux y

A
Iy
Ix

9918
16364.7
3532.2

x
y
3
62 84 1648 10
2954.23 103

= 1.90 0.009 x 0.0012 y


Column#

x (ft)

y (ft)

q (ksf)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

-15
15
15
-15
-30
-15
15
30
-30
-15
15
30
-30
-30
-30
-30
-30
30
30
30
30
30

13.5
13.5
-13.25
-13.25
40.5
40.5
40.5
40.5
-40.5
-40.5
-40.5
-40.5
27
13.5
0
-13.5
-27
27
13.5
0
-13.5
-27

1.75
2.02
2.05
1.78
1.58
1.72
1.99
2.12
1.68
1.81
2.08
2.22
1.60
1.61
1.63
1.65
1.66
2.14
2.15
2.17
2.19
2.20

The soil pressure under the all columns is less than ABC of soil = 1.0

ton
= 2.204ksf .
ft 2

Thickness of MAT:
Lets check the thickness of MAT for critical columns: C1,C6 & C11 shown in FigA.

Page 72 of 85

C1
Critical Perimeter:

d
2

d
2

(20 d ) in

Pu

= 1176.8k

bo

= (20 d ) 3.14(20 d )

vVc Pu
vVc

= 0.85 4 fc 'bo d
=

0.85 4 4000 3.14(20 d ) d


1000

= 0.675d (20 d ) = 13.5d 0.675d 2


0.675d 2 13.5d -1176.8 = 0

= 32.93in

33in
Page 73 of 85

C6
12in

24

15

d
2

d
2

d
2

Pu

= 867.6k

bo

d
3
= (27 ) (24 d) 51 d
2
2

vVc Pu
vVc

= 0.85 4 fc 'bo d
3
0.85 4 4000 (51 d ) d
2
=
1000
3
= 0.215(51 d ) d = 0.3225d 2 10.965 d
2

0.3225d 2 10.965d -648.7 = 0

= 30.96in

31in

Page 74 of 85

C11

d
2

24

d 15
2

d
2

d
2

Pu

= 648.7k

bo

= (15 d ) (24 d) 39 2 d

vVc Pu
vVc

= 0.85 4 fc 'bo d
=

0.85 4 4000 (39 2 d ) d


1000

= 0.215(39 2 d ) d = 0.43d 2 8.385d


0.43d 2 8.385d -648.7 = 0

Thus,

= 30.296in

31in

Thickness of MAT = 33inches

Page 75 of 85

Reinforcement Calculation:
BOTTOM STEEL
a) Along the shorter direction of MAT (Strip-A):

Load Diagram

Bending Moment Diagram

Bottom Steel:
Max. positive moment at bottom of foundation

= 1466.29k ft

1466.29
122.2k ft / ft
12

= 12in

= 33 2.5 30.5in

C =T

0.85 fc ' ab = As f y

0.85 4 12a = 60 As

As

= 0.68a

Mu

a
= As f y (d )
2

Page 76 of 85

a
= 0.9 0.68a 60(30.5 )
2

122.2 12

a 2 61a 79.86 0
a = 1.34

As

min

= 1.34 0.68 = 0.911in 2


=

200
200

0.0033
fy
60000

Asmin = 0.0033 12 30.5 1.21in 2


Thus,
As
Use,

= 1.21in 2

#8@7inch c/c

b) Along the longer direction of MAT(Strip-B):

Load Diagram

Bending Moment Diagram


Max. positive moment at bottom of foundation

= 1769.77 k ft

1769.77
147.48 k ft / ft
12

= 12in

= 33 2.5 30.5in
C =T

Page 77 of 85

0.85 fc ' ab = As f y

0.85 4 12a = 60 As

As

= 0.68a

Mu

a
= As f y (d )
2
a
= 0.9 0.68a 60(30.5 )
2

147.48 12

a 2 61a 96.39 0
a = 1.62

As

min

= 1.62 0.68 = 1.1in 2


=

200
200

0.0033
fy
60000

Asmin = 0.0033 12 30.5 1.21in 2


Thus,
As
Use,

= 1.21in 2

#8@7inch c/c

TOP STEEL
a) Along the shorter direction of MAT (Strip-A):

Max. negative moment at top of foundation = 1114.23k ft

1114.23
92.85k ft / ft
12

= 12in

= 33 2.5 30.5in
C =T

0.85 fc ' ab = As f y

0.85 4 12a = 60 As
Page 78 of 85

As

= 0.68a

Mu

a
= As f y (d )
2
a
= 0.9 0.68a 60(30.5 )
2

92.85 12

a 2 61a 60.69 0
a = 1.01

As

min

= 1.01 0.68 = 0.69in 2


=

200
200

0.0033
fy
60000

Asmin = 0.0033 12 30.5 1.21in 2


Thus,
As
Use,

= 1.21in 2

#8@7inch c/c

b) Along the longer direction of MAT (Strip-B):

Max. negative moment at top of foundation = 1445k ft

1445
120.42k ft / ft
12

= 12in

= 33 2.5 30.5in

C =T

0.85 fc ' ab = As f y

0.85 4 12a = 60 As

As

= 0.68a

Mu

a
= As f y (d )
2

Page 79 of 85

a
= 0.9 0.68a 60(30.5 )
2

120.42 12

a 2 61a 78.7 0
a = 1.32

As

min

= 1.32 0.68 = 0.9in 2


=

200
200

0.0033
fy
60000

Asmin = 0.0033 12 30.5 1.21in 2


Thus,
As
Use,

= 1.21in 2

#8@7inch c/c

Page 80 of 85

DESIGN OF RETAINING WALL


Wall need to be designed against shear and bending, only. As the wall is monolithically
connected to a very rigid thick base slab, so its safe against sliding and overturning.

9in

NSL

surcharge = 500psf

30

H = 6feet

Ps

Pb

120 pcf

O
Base Slab

Lateral Loads Calculation:


Lets assume 1foot depth into the page.
Surcharge Loading:

= 500psf

Ka

PS

= S K a H 500 0.33 6 990lbs

Pb

1 sin 1 sin 30

0.33
1 sin 1 sin 30

Backfill Loading (active pressure):


1
1
K a H 2 120 0.33 62 712.8lbs
2
2

Page 81 of 85

Factored Loads:
PuS

= 1.6 990 1.58K

Pub

= 1.6 712.8 1.14k

Factored Bending Moments about point O:


Mu S

= 1.584 3 12 57k-in

Mub

= 1.14 2 12 27.36k-in

Let thickness of the wall


d

= 9in
= 92 7

Value of moment at critical section,

Mus d

57
(3 0.292) 51.45k in
3

27.36
(2 0.292) 23.36 k in
2

Mubd

d
distance from O.
2

Mu

= 51.45+23.36 = 74.81k-in

d min

Mu
0.205 fc ' b

74.81
2.757in 9in
0.205 4 12

Thus,

(OK)

Thickness of wall = 9in

Shear Check:
Critical shear at d-distance from O.
Vu

= 1.584+1.14 = 2.724k

vVc

= v 2 fc 'bd
=

0.75 2 4000 12 7
7.96k Vu
1000

(OK)

Page 82 of 85

Flexural Design of Stem:


Mu 74.81

0.1271
bd 2 12 7 2

= 0.0025

As

= 0.0025 12 7 0.21in 2

Asmin

= 0.0018 12 9 0.194in 2
As > Asmin
Use,

(OK)

#3 @ 6inch c/c

Page 83 of 85

DESIGN OF STAIRS
10@ 7inch = 5'10"

5foot

UP

5foot

5foot

UP

= 5' 5'10" 10'10"

l
hmin considering one end continuous

l
24

10 12 10
5.42inch 6inch
24

= 5inch

R.C. slab

6
R2 T 2
72 102
150
75
91.55 psf
=
12
T
10

Loads Calculation:
Dead Loads

Weight of steps

R 150
7 150

43.75 psf
=
2 12
2 12

1inch floor finish

1
120 10 psf
12

qD

= 145.3psf

qL

= 200psf

qu

= 1.2(145.3) 1.6(200) 494.36 lb / ft ft

Live Loads

Factored slab loads:

Factored Bending Moment:

Page 84 of 85

Mu

d min for singly reinforced section

Thus,

1
1 494.36
qul 2
1302 1000 69.62k in
10
10
12

69.62
Mu
3.07in
=
0.205 3 12
0.205 fc ' b

h = 6inch

Reinforcement Calculation:

Use,

69.62
0.232
12 52

= 0.0046 > min 0.0018

As

= 0.0046 12 5 0.276in 2

(OK)

#6 @ 8inch c/c

Temperature Reinforcement:
As
Use,

= 0.0018 12 6 0.129in 2

#3 @ 10inch c/c