SCOPE
Structural/Misc. Steel Proposal
DATE:
RE:
ADDENDUMS:
COMPANY:
ADDRESS:
CONTACT:
PHONE:
EMAIL:

4/15/16
Pandol Brothers Office Bldg.
#1/#2
Blumer Construction Inc.
7440 St A Meany Ave Bakersfield CA 93308
Walter Scott
(661) 588-3000 ext 102
Walter Scott <walter@blumerconstruction.com>

In accordance with AISC, Mike Owen Fabrication, Inc. proposes the following scope of
work based on drawings dated:
ARCHITECTURALS: 1/27/2016

STRUCTURALS: 11/23/2015

Furnish and Install:

2ea HSS8x8 columns-BP-5, base PLs-11ea HSS6x6 columns-BP-3 base


PLs-1ea HSS6x3x3/16 & 4ea HSS6x2x3/16 columns-BP-7 & 8, & base
PLs (S1.1) & column cap PLs for support of WF roof beams (Det 10/11 S5.2)
1ea W30x90, 2ea W24x62, 4ea W10x15, 6ea W16x26, 4ea W21x50, 2ea
W21x44, 2ea W18x40, 2ea W18x50, roof beams & 2ea C12x20 fascia beams,
shear PLs for WF to WF connections (S1.2, Det 3/8/11 S5.2) & 2ea W14x34
beam to support the 2 W21x44 roof beams (S1.2, Det 9 S5.2). 13 ea locations
L3x3x3/16 angle kickers (S1.2, Det 9 S5.2 & Det 9 S5.4)
Window sill plan- 2ea HSS6x4 @ grid A, 2ea HSS6x6 & 1ea HSS6x4 @ grid line
3, 3ea HSS6x4 @ grids 5/6/7 & 2ea HSS6x2 @ grid G lower window sills welded
to HSS3x3 sill columns & @ HSS6x2 columns (S1.2, Det 11 S5.1)
Window headers-1ea HSS10x6 & 1ea HSS18x6 @ grid line A, 2ea HSS12x6 @
grid 3 between grids B/E, 2ea HSS8x6 @ grid 3/5 between grids F/G, 1ea
HSS6x6 & 3ea HSS10x6 @ grids 5/6 & between grids A/E @ 2ea HSS18x6 @
grid G welded to columns @ top of window frames (S1.2)

Brace frame #1- 2ea HSS5x5x1/4-BP-2 base PLs-2ea L4x4 @ bottom of


base PLs, 2ea upper gussets weld to columns & welded to W12x30 roof beam,
2ea lower gusset PLs (S1.1/S1.2, Det 4, grid line 7 & grids E-F S3.1).
HSS5x51/4 X braces BR1 (Brace frame sch. S3.1) & knife PL @ center of
brace frame (Det 7 S5.2).
Brace frames #2 & #7-2ea HSS6x6x3/8 & 1ea HSS6x6x1/4 columns-BP-4 11/2 base PLs, , 2ea L4x4 @ bottom of base PLs, 4ea upper gusset PLs welded
to columns & welded to 2ea W18x40 roof beams & 4ea lower gusset PLs (S1.1
S1.2, Det 2, Grid line 3 & grids F-G & Det 7 grid line G & grid line 3-4, S3.1).
HSS5x51/4 X braces BR4 (Brace frame sch. S3.1) & knife PL @ center of
brace frame (Det 7 S5.2).
Chevron brace frames #3 & #6 @ gridline A/grids 4-5 & gridline 2/grids A-B,
1ea HSS6x6x1/4, 1ea HSS6x6x3/8-BP-4 1-1/2 base PLs, 1ea HSS8x8x1/4BP-6, 1-3/4 base PLs- 2ea L4x4 @ bottom of base PLs 2ea upper gusset PLs
welded to 2ea W27x84 roof beams, 4ea lower gusset PLs, (S1.1/S1.2, Det 1/2/8
S5.1 & Det 5 S5.2), HSS5x5 X braces frames BR3/BR5 (Det 1/3 & brace
frame sch. S3.1)
Brace frame #4- 2ea HSS5x5x1/4-BP-2 base PLs-2ea L4x4 @ bottom of
base PLs, , 2ea upper gussets weld to columns & welded to W18x40 roof beam &
2ea lower gusset PLs (S1.1/S1.2, Det 4, grid line 7 & grids E-F S3.1).
HSS5x5x1/4 X braces BR1 (Brace frame sch. S3.1) & knife PL @ center of
brace frame (Det 7 S5.2).
Brace frame #5-1ea HSS6x6x1/4 & 1ea HSS8x8x1/4 columns-BP-4/6 1-1/2/13/4 base PLs-, 2ea upper gussets weld to columns & welded to W27x84 roof
beam & 2ea lower gusset PLs (S1.1/S1.2, Det 5, grid line 6 & between grids A-B
S3.1) HSS5x51/4 X braces BR4 (Brace frame sch. S3.1) & knife PL @ center
of brace frame (Det 7 S5.2).
Brace frame #8-2ea HSS6x6x3/8 columns-BP--4 1-1/2 base PLs, , 2ea L4x4
@ bottom of base PLs, 2ea upper gusset PLs welded to columns & welded to 1ea
W18x40 roof beams & 2ea lower gusset PLs (S1.1/S1.2, Det 8, Grid line G &
between grids 4-5). HSS5x51/4 X braces BR4 (Brace frame sch. S3.1) & knife
PL @ center of brace frame (Det 7 S5.2).
34ea W10x12 beams with L3x3 angles welded to joists, 26ea 5 Sch 40 posts
with PLs welded to bottom & PLs to support 26ea HSS6x4 @ bottom of
screen & HSS6x2 @ top of screen wall (S1.3, Det 1/2 S5.2 & Det 6 S5.4)
Addendum #1 ADD: 2ea W10x22 beams @ grids 2/6 between grids E/F & 1ea
C10x15.3 @ grid 1 with shear PLs (S1.2 Det 3 S5.2)
4ea L4x4 frames for HVAC roof curbs (S1.2, Det 2/3/4 S5.4) & 70ea
L2.5x2.5x3/16 deck support between joists (S1.2, Det 12 S5.2 & Det 5/8/9/10
S5.3)
40 ea joists/bridging & 15,000 sq/ft DGB-36 18ga G60 deck.
1 pair & 1 single leaf trash enclosure gates (Det 1/3 A-1.0). 1ea roof access ladder
(Det 1 A3.0)

FOB (to be installed by others):


Anchor bolts & templates for columns.
6ea HSS3x3 sill columns with PLs on bottom (S1.1, Det 11 S5.1)
HSS5x5x1/4 TE gate posts (Det 3 A-1.0)
Price: $0.00
Exclusions:
Catalog items are excluded.
Demolition is excluded.
Installation of columns/posts/bollards with flagpole footings or any item wet set in
concrete that has been listed as FOB.
Installation of any cast in place or cast in CMU anchor bolts is excluded.
Non-ferrous items, unless specifically noted in scope, are excluded.
10ga and lighter materials, other than steel deck is excluded.
Anchor bolts, nuts, bolts, washers, angles, channels, inserts, straps, connectors, and plates
used by other trades are excluded.
All un-sized members are excluded.
Attachment to wood is excluded.
Grout and grouting for column bases and beam seats is excluded.
Traffic Control is excluded.
Cost of inspections is excluded, including per diem for inspectors is excluded.
Blocking for handrails, ladders, ledgers and roof screen frames is excluded.
Catalog hold-down hardware and installation is excluded.
Holes in structural members for other trades not shown on structural drawings are
excluded.
Deck penetration for other trades is excluded.
Ornamental iron; except as noted in scope, is excluded.
All design and engineering, including connections and lifting lugs, are excluded.
Any and all anchors, bolts, or hardware for other trades are excluded.
Responsibility for any errors, omissions, conflicts, code violations, and improper use of
materials if shown on the bid documents is excluded.
Note: Required Scheduled Delivery Dates Must be Negotiated and approved prior to Start of
Fabrication.
DRAWINGS:
FABRICATION:
COATINGS:
INSTALLATION:

3 to 3-1/2 Weeks
3 Weeks
1 Week
3-1/2 to 4 Week

Conditions:
During the detailing process all issues will be handled through the RFI process, all steps
will be taken to submit with no clouds or questions remaining. Drawings will not be

submitted until all issues have been resolved.


Any discussions of details, or scope not defined on the structural and architectural
drawings, or provided in an RFI response are not included in this proposal.
Unless specified otherwise all submittals will be done electronically.
It is not the intent or the understanding that Mike Owen Fabrication, Inc. shall assume
any liability or responsibility that should be borne by the Architect, Owner, or General
Contractor.
Mike Owen Fabrication, Inc. will not proceed with fabrication until an executed
subcontract or purchase order is received.
Any item in our proposal can be negotiable but must be discussed first, if any item is in
conflict with your standard contract please do not assume we will accept.
No change order work will be done without a signed change order.
Due to the rising cost of steel, steel will be ordered when contract, or letter of intent, is
received and payment for material is required within 45 days of billing.
If there is a conflict in the drawings we assume structural drawings take precedence
unless clarification is given.
Metal stud framing within ten feet of steel members to begin after structural steel is
erected, as to not conflict with the erection of structural steel.
Anchor Bolts set plumb and per plan and cleaned by others
Detailing schedule to be determined.
Anchor bolts for structural steel columns supplied with templates, un-assembled.
Forms and debris clear of base plate to allow sufficient access to leveling nuts with end
wrenches
Equipment access to building footprint on slab and around building
One coat red oxide primer applied to all steel. Galvanizing is excluded unless otherwise
specifically noted.
Ornamental iron, if any, will have one coat shop primer. Galvanizing is excluded unless
otherwise noted.
We will not participate in any liquidated damages.
One continuous erection mobilization for the structural steel and one mobilization for
miscellaneous steel are anticipated. Extra mobilizations will be a minimum of $1,500.00
+ equipment rental per mobilization depending on the location.
Delays encountered during mobilization will be billed as extra work. Half day minimum.
Mike Owen Fabrication Inc. is LA City Certified Fabricator and follows the latest AISC
procedures and recommendations for fabrication and erection of structural steel.
However, we are not designated as an AISC erector nor are we designated as an AISC
certified plant.
Unless specifically listed, only work shown on architectural and structural design
drawings is included.
Due to the rapid price increases of steel, we will only honor the material portion of this
proposal for 45 days.
This proposal, in its entirety, will become part of any contractual agreement

Thank you for the opportunity to present this proposal.