DINAS PEKERJAAN UMUM
KABUPATEN TEGAL
No
Uraian pekerjaan
1 CA1
Isolator tumpu ( line post) 20 KV
Spool Isolator ansi 53-2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Bolt single Upset 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
2 CA1'
:
:
:
#REF!
Satuan
Unit
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
mtr
Unit
Unit
bh
Volume
1
1
1
1
2
1
3
2.6
1
1
1
1
2
2
1.8
1
1
2
1
2
3
1
2.8
1
1
2
1
2
3
1
2.8
1
1
2
2
2
2
1
1
1
1
1
1
1
2
1
1
1
1
0.8
1
1
1
Rp
215,600
36,050
79,900
19,050
30,200
3,200
6,600
22,400
215,600
36,050
79,900
38,100
30,200
9,600
17,160
22,400
215,600
79,900
19,050
3,200
6,600
21,296
215,600
79,900
38,100
6,400
11,880
21,296
215,600
36,050
79,900
19,050
18,540
6,600
35,342
431,200
36,050
159,800
57,150
18,540
18,480
35,342
36,050
36,050
79,900
19,050
18,540
6,600
44,922
72,100
36,050
159,800
57,150
18,540
18,480
44,922
215,600
79,900
4,000
6,600
43,364
431,200
159,800
8,000
13,200
43,364
245,200
36,050
16,750
29,500
19,096
3,200
19,050
56,650
18,000
60,500
6,600
58,232
245,200
36,050
16,750
29,500
19,096
6,400
19,050
56,650
18,000
60,500
5,280
58,232
245,200
245,200
Hal. 2
No
Uraian pekerjaan
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Angle Clamp 35 s/d 70 mm2
Armour Rod # for AAAC 240 mm2
Upah Pemasangan
Satuan
bh
bh
bh
bh
set
Unit
Volume
1
1
1
1
1
1
Rp
45,700
19,096
18,000
56,650
121,250
43,364
Hal. 3
No
Uraian pekerjaan
8 CA4
Isolator Tarik 20 KV ( 2 pcs )
Spool Isolator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval eye bolt 5/8" x 10"
Oval eye nut 5/8"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
9 CA4'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
10 CA5
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Spool Isolator Ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
11 CA5'
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
12 CA5-1
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator Ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
13 CA5-1'
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Volume
1
2
2
2
2
2
2
2
4
2
2
2
2
1
1
2
1
1
2
2
2
2
2
1
1
1
1
2
1
1
1
1
1
1
1
2
1
1
1
1
2
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
2
1
1
1
1
2
1
1
Rp
245,200
41,200
19,050
29,500
16,750
19,096
3,200
37,000
60,500
18,000
67,300
25,770
46,358
490,400
82,400
38,100
59,000
33,500
38,192
6,400
148,000
121,000
36,000
134,600
51,540
46,358
245,200
29,500
19,096
16,750
3,200
37,000
18,000
67,300
55,343
490,400
29,500
19,096
33,500
6,400
74,000
36,000
134,600
55,343
245,200
16,750
3,200
41,200
19,050
29,500
19,096
60,500
18,000
67,300
25,770
29,948
245,200
16,750
6,400
41,200
19,050
29,500
19,096
60,500
18,000
67,300
51,540
29,948
245,200
16,750
3,200
18,000
67,300
55,343
245,200
16,750
6,400
18,000
67,300
55,343
245,200
41,200
19,050
29,500
16,750
3,200
19,096
60,500
37,000
18,000
67,300
25,770
29,948
245,200
41,200
19,050
29,500
16,750
6,400
19,096
60,500
74,000
18,000
67,300
51,540
29,948
245,200
16,750
3,200
37,000
18,000
245,200
16,750
6,400
37,000
18,000
Hal. 4
No
Uraian pekerjaan
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
Satuan
bh
Unit
Volume
1
1
Rp
67,300
26,114
Hal. 5
No
Uraian pekerjaan
14 CA6
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator Ansi 53-4
Clevis Swinging Secondary
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Armour Rod # for AAAC 70 mm2
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Upah Pemasangan
15 CA6'
16
17
18
19
20
21
22
Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Volume
1
2
2
2
2
2
2
4
2
2
4
1
1
2
1
2
2
1
2
1
1
1
2
7
1
1
1
1
2
1
7
1
1
1
1
2
9
1
1
1
1
2
1
9
1
1
1
1
2
11
1
1
1
1
2
1
11
1
1
1
1
2
12
1
Rp
245,200
41,200
19,050
19,096
18,000
67,300
25,770
60,500
16,750
3,200
56,674
490,400
82,400
38,100
38,192
36,000
134,600
103,080
121,000
33,500
12,800
56,674
245,200
19,096
18,000
67,300
16,750
3,200
54,571
490,400
19,096
36,000
134,600
16,750
6,400
54,571
45,700
38,100
8,450
12,800
27,190
45,700
76,200
59,150
12,800
27,190
19,050
38,100
3,200
8,450
12,800
27,190
19,050
76,200
3,200
59,150
12,800
27,190
45,700
38,100
8,450
12,800
27,190
45,700
76,200
76,050
12,800
27,190
19,050
38,100
3,200
8,450
12,800
27,190
19,050
76,200
3,200
76,050
12,800
27,190
45,700
38,100
8,450
12,800
27,190
45,700
76,200
92,950
12,800
27,190
19,050
38,100
3,200
8,450
12,800
27,190
19,050
76,200
3,200
92,950
12,800
27,190
45,700
38,100
8,450
12,800
45,700
76,200
101,400
12,800
Hal. 6
No
Uraian pekerjaan
Upah Pemasangan
Satuan
Unit
Volume
1
Rp
27,190
Hal. 7
No
Uraian pekerjaan
Satuan
Volume
23 E 1-2 ( 12 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
24 SE 1-2 ( 7 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
25 E 1-2 ( 7 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
26 SE 1-2 ( 9 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
27 E 1-2 ( 9 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
28 SE 1-2 ( 11 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
29 E 1-2 ( 11 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
30 SE 1-2 ( 12 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
31 E 1-2 ( 12 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
32 SE1-3 (11 M)
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
1
1
2
1
12
1
1
1
1
2
1
7
1
1
1
1
2
1
7
1
1
1
1
2
1
9
1
1
1
1
2
1
9
1
1
1
1
2
1
11
1
1
1
1
2
1
11
1
1
1
1
2
1
12
1
1
1
1
2
1
12
1
1
1
Rp
19,050
38,100
3,200
8,450
12,800
27,190
19,050
76,200
3,200
101,400
12,800
27,190
45,700
38,100
3,200
12,400
12,800
27,190
45,700
76,200
3,200
86,800
12,800
27,190
19,050
38,100
3,200
12,400
12,800
27,190
19,050
76,200
3,200
86,800
12,800
27,190
45,700
38,100
3,200
12,400
12,800
27,190
45,700
76,200
3,200
111,600
12,800
27,190
19,050
38,100
3,200
12,400
12,800
27,190
19,050
76,200
3,200
111,600
12,800
27,190
45,700
38,100
3,200
12,400
12,800
27,190
45,700
76,200
3,200
136,400
12,800
27,190
19,050
38,100
3,200
12,400
12,800
27,190
19,050
76,200
3,200
136,400
12,800
27,190
45,700
38,100
3,200
22,500
12,800
27,190
45,700
76,200
3,200
270,000
12,800
27,190
19,050
38,100
3,200
22,500
12,800
27,190
19,050
76,200
3,200
270,000
12,800
27,190
Hal. 8
No
Uraian pekerjaan
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
Satuan
bh
bh
bh
mtr
bh
Unit
Volume
1
2
1
11
1
1
Rp
45,700
76,200
3,200
247,500
12,800
27,190
Hal. 9
No
Uraian pekerjaan
Satuan
Volume
33 E1-3(11 M)
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
34 SE1-3 (12 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
35 E1-3 (12 M)
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
36 SE2-2
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Guy Wire 35 mm2
Nut thimble eye 5/8"
Upah Pemasangan
37 SE2-3
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Guy Wire 70 mm2
Nut thimble eye 5/8"
Upah Pemasangan
38 E2-3
Bolt Machine 5/8" x (14" s/d 22")
Three Bolt Clamp (Guy Grip)
Guy Wire 70 mm2
Nut thimble eye 5/8"
Upah Pemasangan
39 F 1-2
Rod Anchor 5/8" x 7
Expanding Anchor 8.000 lbs
Upah Pemasangan
40 F 1-3
Rod Anchor 5/8" x 7
Expanding Anchor 10.000 lbs
Upah Pemasangan
41 J5-T (CJ2)
Suspension / small angle assembly (CJ5-T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping
Upah Pemasangan
42 J7 - T (CJ3)
Large angle assembly (CJ7 - T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping
Upah Pemasangan
43 J6 - T (CJ4)
Dead End Assembly (CJ6 - T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
Unit
Unit
bh
bh
Unit
Unit
bh
mtr
bh
bh
Unit
Unit
bh
mtr
bh
bh
Unit
Unit
bh
mtr
bh
bh
1
1
2
1
11
1
1
1
1
2
1
12
1
1
1
1
2
1
12
1
1
1
1
2
20
2
1
1
2
2
20
2
1
1
1
2
20
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Rp
19,050
3,200
22,500
12,800
27,190
0
38,100
3,200
247,500
12,800
27,190
45,700
38,100
3,200
22,500
12,800
35,761
45,700
76,200
3,200
270,000
12,800
35,761
19,050
38,100
3,200
22,500
12,800
35,761
19,050
76,200
3,200
270,000
12,800
35,761
45,700
38,100
12,400
15,000
35,761
45,700
76,200
248,000
30,000
35,761
45,700
38,100
22,500
15,000
91,400
76,200
450,000
30,000
0
19,050
38,100
22,500
15,000
36,197
19,050
76,200
450,000
30,000
36,197
87,550
102,050
19,406
87,550
102,050
19,406
87,550
103,300
19,406
87,550
103,300
19,406
33,100
10,900
2,100
2,060
25,289
33,100
10,900
2,100
2,060
25,289
106,200
10,900
2,100
2,060
14,109
106,200
10,900
2,100
2,060
14,109
73,140
10,900
2,100
2,060
73,140
10,900
2,100
2,060
Hal. 10
No
Uraian pekerjaan
Upah Pemasangan
Satuan
Unit
Volume
1
Rp
681,245
Hal. 11
No
Uraian pekerjaan
44 MJ6 - T (CJ4)
Insulating Tape (MJ6-T)
Split Plastic Slave (Tutup Kabel)
Stoping Buckel / Yokes
Plastic Strap For Clamping
Stainless Stell Strap 20 x 0,7 mm2
Upah Pemasangan
45 CG105 - 50
Amor rod tapping
Aluminium connector
Braket transformer
Clamp hot line top assembly
Distribusi trafo 50 KVA
Jamper requaired
Kabel TX 2 x 70
Upah Pemasangan
46 P.12
Bolt Machine 5/8 x 12 "
Pipa galvanis 3"
Upah pasang
47 P12.C
Cross Arm Stell 2000
Bolt Machine 5/8" x 10 "
Washer Square 2 1/4 "
Upah Pemasangan
48 P12.C'
Cross Arm Stell 2000
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 12"
Upah Pemasangan
49 CM5 - 2
Isolator Tumpu 20 KV (Short Sank)
Center Bracket 12,5 KN
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Compression terminal Lug 35mm2
Upah Pemasangan
50 CM2-11
Ground rod 5/8" x 8" copper weld
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 16 mm2
Ground lug & washer
Upah Pemasangan
51 CM2 - 12
Bimetal Connector
Ground wire Cu 16mm2
Ground lug & Washer
Upah Pemasangan
52 CM2 - 12A
Bimetal Connector
Ground wire Cu 16mm2
Ground lug & Washer
Upah Pemasangan
53 CM2-15
Pole Band Double Rack 9" s/d 12"
Pole Band Double Rack 7" atau 7 1/2"
Ground rod 5/8" x 8" copper weld
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 50 mm2
Ground lug & washer
Grounding Iron Plate form Plat/Earth safety mats
Satuan
Unit
bh
bh
bh
bh
mtr
Unit
Unit
set
bh
bh
bh
bh
bh
mtr
unit
Unit
bh
mtr
set
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
mtr
bh
bh
Volume
1
1
1
1
1
1
1
1
1
3
2
1
1
1
3
1
1
2
3
1
1
1
2
2
1
1
2
2
2
1
1
1
1
2
2
1.8
2
1
1
1
1
1
2
2
1
1
1
0.8
1
1
1
1
1
1
1
1
1
2
4
4
2
7
2
1
Rp
23,300
2,100
2,100
2,060
10,900
681,245
23,300
2,100
2,100
2,060
10,900
681,245
16,900
26,400
334,750
149,350
33,359,700
#REF!
#REF!
681,245
16,900
79,200
669,500
149,350
33,359,700
#REF!
#REF!
681,245
17,600
203,200
21,429
35,200
609,600
21,429
359,500
19,050
3,200
29,948
359,500
38,100
6,400
29,948
359,500
19,050
29,200
29,948
719,000
38,100
58,400
29,948
215,600
79,900
16,900
3,200
6,600
36,050
11,979
215,600
79,900
33,800
6,400
11,880
72,100
11,979
119,800
13,900
40,400
23,200
11,300
19,406
119,800
13,900
40,400
34,800
22,600
19,406
40,400
23,200
11,300
147,501
40,400
18,560
11,300
147,501
40,400
23,200
11,300
14,488
40,400
23,200
11,300
14,488
36,900
45,700
119,800
13,900
40,400
67,300
11,300
1,138,400
36,900
91,400
479,200
55,600
80,800
471,100
22,600
1,138,400
Hal. 12
No
Uraian pekerjaan
Satuan
bh
Unit
Volume
1
1
Rp
40,000
54,825
Hal. 13
No
Uraian pekerjaan
Satuan
Volume
54 CM3-4
Pole Band Double Rack 7" atau 7 1/2"
Compression terminal Lug 35mm2
Fuse Cut Out 20 KV, 100 A
Fuse link
Bracket Extension for cut out
Upah Pemasangan
55 CM2-11 M
Ground rod 5/8" x 8" copper weld
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 16 mm2
Ground lug & washer
Pipa Paralon 1/2"
Stoping Buckel / Yokes
Stainless Stell Strap 20 x 0,7 mm2
Upah Pemasangan
56 CM5-3
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
57 CM5-4
Isolator Tumpu 20 KV (Short Sank)
Pole Band Double Rack 7" atau 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
58 CM5-5
Isolator Tumpu 20 KV (Short Sank)
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
59 CM5-6
Compression connector H type 70 mm2/70mm2
AAAC 70 mm2
Lightning arrester 20 KV, 5 KA
Upah Pemasangan
60 CM5-8
Isolator tarik (suspension ) 20 KV
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Primary Dead End Clamp (150 s/d 240 ) mm2
Upah Pemasangan
61 CM5-9
Fuse Cut Out 20 KV, 100 A
Fuse link
Compression terminal Lug 35mm2
Upah Pemasangan
62 CM5-12
Pole Band Single rack 7 1/2"
Cross arm steel 1.500 mm (UNP 10 ) Galvanis
Washer Square 2 1/4 "
Upah Pemasangan
63 CM5-13
Pole Band Single rack 7 1/2"
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Upah Pemasangan
64 CM5-16
Bolt machine 5/8" x 10"
Pole Band Single rack 8" atau 8 1/2"
Cross arm steel 3.000 mm (UNP 10 ) Galvanis
Washer Square 2 1/4 "
Upah Pemasangan
Unit
bh
bh
bh
bh
bh
Unit
1
2
1
1
1
1
1
bh
bh
bh
mtr
bh
mtr
bh
mtr
Unit
Unit
bh
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
unit
bh
bh
bh
unit
unit
bh
bh
bh
Unit
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
Unit
1
1
1
10
2
5.5
6
4.8
1
1
1
1
2
1
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
2
1
1
1
1
1
2
1
Rp
45,700
36,050
1,133,000
#REF!
60,500
29,948
91,400
36,050
1,133,000
#REF!
60,500
29,948
119,800
13,900
40,400
23,200
11,300
9,700
2,100
10,900
19,406
119,800
13,900
40,400
232,000
22,600
53,350
12,600
52,320
19,406
45,700
21,779
45,700
21,779
215,600
45,700
6,600
51,017
215,600
45,700
13,200
51,017
215,600
3,200
6,600
35,761
215,600
6,400
13,200
35,761
28,600
49,500
724,300
51,017
28,600
49,500
724,300
51,017
245,200
45,700
18,000
19,096
3,200
94,300
35,761
245,200
45,700
18,000
19,096
3,200
94,300
35,761
1,133,000
#REF!
36,050
35,761
1,133,000
#REF!
36,050
35,761
29,500
269,600
3,200
17,688
29,500
269,600
6,400
17,688
29,500
26,400
4,000
22,967
29,500
52,800
8,000
22,967
19,050
30,900
539,400
3,200
17,688
19,050
30,900
539,400
6,400
17,688
Hal. 14
No
Uraian pekerjaan
65 CM5-20
Isolator tarik (suspension ) 20 KV
Shackle Anchor 5/8
Oval Eye Nut 5/8"
Primary Dead End Clamp (150 s/d 240 ) mm2
Upah Pemasangan
Satuan
Unit
bh
bh
bh
bh
Unit
Volume
1
1
1
1
1
1
Rp
245,200
18,000
19,096
94,300
22,967
245,200
18,000
19,096
94,300
22,967
Hal. 15
No
Uraian pekerjaan
Satuan
Volume
66 CJ5
Bolt double up set 5/8" x 10"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
67 CJ6
68
69
70
71
72
73
74
75
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
set
bh
Unit
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
0.8
1
1
1
1
0.8
1
1
1
1
1
1
0.8
1
1
1
1
0.8
1
1
1
1
1
1
1
2
1
1
1
1
1
1
0.8
1
1
1
1
0.8
1
Rp
27,600
36,050
6,600
17,688
27,600
36,050
6,600
17,688
16,750
3,200
19,050
41,200
5,900
25,770
30,946
16,750
3,200
19,050
41,200
5,900
25,770
30,946
19,096
5,900
19,050
41,200
25,770
17,688
19,096
5,900
19,050
41,200
51,540
17,688
16,750
3,200
19,050
41,200
6,600
30,946
16,750
3,200
19,050
41,200
5,280
30,946
30,200
36,050
6,600
17,688
30,200
36,050
5,280
17,688
19,050
3,200
36,050
18,540
6,600
18,862
19,050
3,200
36,050
18,540
5,280
18,862
47,300
36,050
6,600
36,277
47,300
36,050
5,280
36,277
29,500
19,096
19,050
41,200
5,900
25,770
30,946
29,500
19,096
19,050
41,200
5,900
51,540
30,946
29,500
19,096
19,050
41,200
6,600
30,946
29,500
19,096
19,050
41,200
5,280
30,946
47,300
36,050
6,600
21,779
47,300
36,050
5,280
21,779
Hal. 16
No
Uraian pekerjaan
Satuan
Volume
76 SJ10
Pole Band Single rack 7 1/2"
Bracket Secondary / bracket Insulated
Spool Insulator Ansi 53-4
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
Unit
bh
bh
bh
mtr
Unit
1
1
1
1
0.8
1
29,500
18,540
41,200
6,600
18,862
Rp
29,500
18,540
41,200
5,280
18,862
Hal. 17
No
Uraian pekerjaan
77 SA1
Isolator Tumpu ( line post) 20 KV
Spool Insulator Ansi 53-2
Center Bracket 12,5 KN
Pole Band Single Up set 7" atau 7 1/2"
Pole Band Single rack 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
78 SA1'
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Pole Band Single rack 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
79 SA2
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53-2
Center Bracket 12,5 KN
Pole Band Single rack 7 1/2"
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
80 SA2'
Isolator tumpu ( pin post) 20 KV
Center Bracket 12,5 KN
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
81 SA3
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator Ansi 53-4
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Primary Dead End Clamp 35 s/d 70 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Shackle Anchor 5/8
Armour Rod # for AAAC 70 mm2
Upah Pemasangan
82 SA3'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Angle Clamp 35 s/d 70 mm2
Armour Rod # for AAAC 70 mm2
Upah Pemasangan
83 SA4
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Compression Connector H type 70/150 mm2
Armour Rod # for AAAC 70 mm2
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Shackle Anchor 5/8
Upah Pemasangan
84 SA4'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Satuan
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
mtr
bh
set
Unit
Unit
bh
bh
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
unit
Unit
bh
bh
bh
Volume
1
1
1
1
1
2
2.6
1
1
1
1
2
1.8
1
1
2
1
2
1
1
2.8
2
1
1
2
2
2
2
1
1
1
1
2
2
1
1
0.8
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
4
4
2
2
2
4
2
1
1
2
2
2
Rp
215,600
36,050
79,900
47,300
29,500
6,600
35,316
215,600
36,050
79,900
47,300
59,000
17,160
35,316
215,600
79,900
29,500
6,600
32,399
215,600
79,900
59,000
11,880
32,399
215,600
36,050
79,900
29,500
18,540
6,600
45,700
51,017
431,200
36,050
159,800
29,500
18,540
18,480
91,400
51,017
215,600
79,900
6,600
45,700
48,100
431,200
159,800
13,200
91,400
48,100
245,200
41,200
29,500
19,096
19,050
67,300
6,600
18,000
60,500
27,190
245,200
41,200
59,000
38,192
19,050
67,300
5,280
18,000
60,500
27,190
245,200
45,700
19,096
18,000
56,650
60,500
24,262
245,200
45,700
19,096
18,000
56,650
60,500
24,262
245,200
41,200
19,050
29,500
19,096
37,000
60,500
67,300
25,770
18,000
27,190
490,400
82,400
38,100
118,000
76,384
74,000
121,000
134,600
103,080
36,000
27,190
245,200
29,500
19,096
490,400
59,000
38,192
Hal. 18
No
Uraian pekerjaan
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
Satuan
bh
bh
bh
Unit
Volume
1
2
2
1
Rp
37,000
36,000
134,600
24,262
Hal. 19
No
Uraian pekerjaan
85 SA5
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
86 SA5'
87
88
89
90
91
Satuan
Unit
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
set
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
mtr
bh
bh
Volume
1
1
1
1
2
2
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
2
2
2
4
2
4
2
2
2
1
1
2
2
2
1
2
1
1
2
1
2
2
10.4
4
2
Rp
245,200
41,200
19,050
29,500
19,096
60,500
18,000
67,300
25,770
51,017
245,200
41,200
19,050
59,000
38,192
60,500
18,000
67,300
51,540
51,017
245,200
29,500
19,096
18,000
67,300
57,891
245,200
29,500
19,096
18,000
67,300
57,891
245,200
41,200
19,050
29,500
19,096
60,500
67,300
25,770
18,000
37,000
55,695
245,200
41,200
19,050
59,000
38,192
60,500
67,300
51,540
18,000
74,000
55,695
245,200
29,500
19,096
67,300
18,000
37,000
278,478
245,200
29,500
19,096
67,300
18,000
37,000
278,478
245,200
41,200
19,050
19,096
67,300
25,770
60,500
29,500
18,000
67,917
490,400
82,400
38,100
76,384
134,600
103,080
121,000
59,000
36,000
67,917
245,200
19,096
67,300
29,500
18,000
339,584
490,400
38,192
134,600
29,500
36,000
339,584
215,600
269,600
21,950
4,000
6,600
3,200
45,700
431,200
269,600
43,900
8,000
68,640
12,800
91,400
Hal. 20
No
Uraian pekerjaan
Upah Pemasangan
Satuan
Unit
Volume
1
Rp
140,340
Hal. 21
No
Uraian pekerjaan
92 B1A
Isolator tumpu (line post) 20 KV
Side Bracket 12,5 KN
Bolt Machine 5/8 x 12 "
Tie Wire #4 / Aluminium Bonding Wire #20
Washer Square 2 1/4 "
Upah Pemasangan
93 B2
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Washer Square 2 1/4 "
Bolt Double Arming 5/8" x 12"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
94 B3
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval Eye Nut 5/8"
Tie Wire #4 / Aluminium Bonding Wire #20
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Compression Connector H type 70/150 mm2
Upah Pemasangan
95 B4
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Cross Arm Stell 1500
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Compression Connector H type 70/150 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
96 B5
Isolator Tarik 20 KV ( 2 pcs )
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
97 CC1
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator ansi 53-2
Center Bracket 12,5 KN
Satuan
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
Volume
1
2
2
2
10.4
2
1
1
4
2
4
2
4
3
4
10.4
1
1
4
1
2
4
2
3
4
4
2.6
4
4
2
1
1
4
1
8
4
5
2
4
8
4
4
4
4
4
5.2
1
1
2
2
4
2
2
2
4
4
2
2
3
1
1
3
1
1
Rp
215,600
69,300
17,600
6,600
3,200
67,917
431,200
138,600
35,200
68,640
6,400
67,917
215,600
269,600
21,950
45,700
3,200
29,200
4,000
6,600
55,695
862,400
539,200
87,800
91,400
12,800
87,600
16,000
68,640
55,695
245,200
215,600
269,600
21,950
45,700
29,200
4,000
19,096
6,600
18,000
67,300
37,000
57,891
980,800
215,600
539,200
87,800
91,400
87,600
16,000
76,384
17,160
72,000
269,200
74,000
57,891
245,200
215,600
21,950
45,700
29,200
16,900
3,200
4,000
269,600
19,096
18,000
67,300
37,000
6,600
57,891
980,800
215,600
175,600
182,800
146,000
33,800
12,800
32,000
1,078,400
76,384
72,000
269,200
148,000
34,320
57,891
245,200
269,600
21,950
45,700
29,200
16,900
3,200
4,000
19,096
18,000
67,300
57,891
490,400
539,200
87,800
91,400
58,400
33,800
12,800
16,000
38,192
36,000
201,900
57,891
245,200
36,050
79,900
735,600
36,050
79,900
Hal. 22
No
Uraian pekerjaan
Side Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
Satuan
bh
bh
bh
bh
mtr
Unit
Volume
2
4
1
3
8.6
1
Rp
138,600
76,200
30,200
9,600
56,760
54,964
Hal. 23
No
Uraian pekerjaan
98 CC1'
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Side Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
99 CC1-1
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500
Brace steel 550 mm
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7 1/2"
Upah Pemasangan
100 CC1-A
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500
Brace steel 550 mm
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7 1/2"
Upah Pemasangan
101 CC.1-A'
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm2
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt Machine 5/8" x 10"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole band Single Rack 71/2"
Upah Pemasangan
102 CC.2
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53-2
Side Bracket
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bracket Secondary / Bracket Insulated
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
103 CC.2'
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Side Bracket
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Satuan
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
Volume
1
3
1
2
4
4
7.8
1
1
2
1
1
1
2
1
4
3
1
2
8.6
1
1
1
2
1
1
1
2
1
4
3
1
2
8.6
1
1
1
2
1
1
2
1
3
2
3
7.8
1
1
1
3
1
2
1
4
1
3
8.6
1
1
1
1
2
4
2
Rp
215,600
79,900
69,300
19,050
3,200
6,600
67,917
646,800
79,900
138,600
76,200
12,800
51,480
67,917
215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
30,200
4,000
6,600
29,500
64,999
431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
30,200
8,000
56,760
29,500
64,999
215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
30,200
4,000
6,600
29,500
67,917
431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
30,200
8,000
56,760
29,500
67,917
215,600
215,600
269,600
21,950
79,900
3,200
4,000
19,050
6,600
29,500
67,917
431,200
215,600
269,600
43,900
79,900
9,600
8,000
57,150
51,480
29,500
67,917
215,600
269,600
69,300
79,900
19,050
18,540
3,200
6,600
64,999
646,800
269,600
138,600
79,900
76,200
18,540
9,600
56,760
64,999
215,600
79,900
69,300
19,050
3,200
215,600
79,900
138,600
76,200
6,400
Hal. 24
No
Uraian pekerjaan
Satuan
Volume
mtr
Unit
7.8
1
6,600
67,917
Rp
51,480
67,917
Hal. 25
No
Uraian pekerjaan
104 CC2 - A
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500 (UNP 10) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Bracket Secondary / Bracket insulated
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
105 CC2-1
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 3000 (UNP 10) galvanis
Brace steel 770 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Bracket Secondary / Bracket insulated
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
106 CC2 - A'
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500 (UNP 10) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
107 CC.3
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53 - 2
Clevis Swinging Secondary
Primary Angle Clamp 150 s/d 240 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Armour Rod # for AAAC 240 mm2
Pole Band Single rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8"
Upah Pemasangan
108 CC.3'
Isolator Tarik 20 KV ( 2 pcs )
Primary Angle Clamp 150 s/d 240 mm2
Armour Rod # for AAAC 240 mm2
Oval Eye Nut 5/8"
Shackle Anchor 5/8"
Washer Square 2 1/4 "
Upah Pemasangan
Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
mtr
set
bh
bh
bh
Unit
Unit
bh
bh
set
bh
bh
bh
Unit
Volume
1
4
2
1
2
4
2
3
3
4
4
16.4
1
1
1
1
4
2
1
2
4
2
5
3
4
4
16.4
1
1
1
1
4
2
2
4
2
5
3
4
2
15.6
1
1
1
3
1
1
3
0.8
3
4
3
3
1
1
3
3
3
3
3
6
1
Rp
215,600
215,600
36,050
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
18,540
45,700
67,917
862,400
431,200
36,050
539,200
87,800
159,800
57,150
87,600
16,000
12,800
108,240
18,540
45,700
67,917
215,600
215,600
36,050
539,400
26,400
79,900
19,050
29,200
4,000
3,200
6,600
18,540
45,700
67,917
862,400
431,200
36,050
1,078,800
105,600
159,800
95,250
87,600
16,000
12,800
108,240
18,540
45,700
67,917
215,600
215,600
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
45,700
64,999
862,400
431,200
539,200
87,800
159,800
95,250
87,600
16,000
6,400
102,960
45,700
64,999
245,200
36,050
19,050
60,500
6,600
121,250
29,500
19,096
18,000
86,546
735,600
36,050
19,050
181,500
5,280
363,750
118,000
57,288
54,000
86,546
245,200
735,600
0
363,750
57,288
54,000
19,200
83,618
121,250
19,096
18,000
3,200
83,618
Hal. 26
No
Uraian pekerjaan
109 CC 7
Isolator Tarik 20 KV ( 2 pcs )
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Arrmour tipe 1/4" wide
Clevis Swinging Secondary
Primary Dead End Clamp 150 s/d 240 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Shackle Anchor 5/8"
Upah Pemasangan
110 CC 7'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8"
Primary Dead End Clamp 150 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval eye bolt 5/8" x 10"
Upah Pemasangan
111 CC 7 A
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53 - 4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Arrmour tipe 1/4" wide
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Shackle Anchor 5/8"
Primary Dead End Clamp 150 s/d 240 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
112 CC 7 A'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Shackle Anchor 5/8"
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan
Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Volume
1
3
3
1
2
4
1
3
1
3
11
1
1
3
2
4
3
1
1
3
2
4
1
3
3
10
3
3
4
1
1
1
3
1
2
4
2
3
1
3
1
4
11
1
3
3
2
1
1
3
2
4
1
3
1
2
4
11
3
3
1
Rp
245,200
18,000
41,200
60,500
21,950
45,700
29,200
16,750
19,096
3,200
5,900
19,050
94,300
25,770
4,000
18,000
140,340
735,600
54,000
41,200
121,000
87,800
45,700
87,600
16,750
57,288
35,200
5,900
19,050
282,900
51,540
16,000
54,000
140,340
245,200
359,500
21,950
45,700
29,200
19,096
3,200
18,000
94,300
4,000
16,750
140,340
735,600
719,000
87,800
45,700
87,600
57,288
32,000
54,000
282,900
16,000
16,750
140,340
245,200
41,200
269,600
21,950
45,700
29,200
16,750
19,096
5,900
4,000
3,200
19,050
18,000
94,300
25,770
137,414
735,600
41,200
539,200
87,800
91,400
87,600
16,750
57,288
5,900
16,000
35,200
19,050
54,000
282,900
51,540
137,414
245,200
269,600
21,950
45,700
29,200
16,750
19,096
4,000
3,200
18,000
94,300
55,695
735,600
539,200
87,800
45,700
87,600
16,750
38,192
16,000
35,200
54,000
282,900
55,695
Hal. 27
No
Uraian pekerjaan
Satuan
Volume
113 CC 8
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Arrmour tipe 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Center Bracket 12,5 KN
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 1500 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Washer Square 2 1/4 "
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan
114 CC 8 - A
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Arrmour tipe 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Bolt Machine 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 1500 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Washer Square 2 1/4 "
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan
115 CC 8 A'
Isolator tumpu 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8"
Tie Wire #4 / Aluminium Bonding Wire #20
Compression Connector H type 150/240mm2
Primary Dead End Clamp 150 s/d 240 mm2
Bolt Machine 5/8" x 8"
Upah Pemasangan
116 SC . 1
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53 - 2
Center Bracket 12,5 KN
Unit
bh
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
bh
Unit
Unit
bh
bh
bh
1
2
1
6
7.8
4
1
3
1
4
1
4
2
4
2
7
2
6
2
11
6
1
1
3
6
7.8
8
1
5
1
2
8
4
2
4
4
7
6
6
2
21
6
1
1
3
6
4
8
4
1
8
4
5
21
6
7.8
4
6
2
1
1
3
1
1
Rp
215,600
215,600
245,200
6,600
26,400
5,900
29,200
16,750
4,000
79,900
25,770
19,050
43,280
269,600
19,096
45,700
18,000
41,200
3,200
94,300
55,695
431,200
215,600
1,471,200
51,480
105,600
5,900
87,600
16,750
16,000
79,900
103,080
38,100
173,120
539,200
133,672
91,400
108,000
82,400
35,200
565,800
55,695
215,600
245,200
6,600
26,400
5,900
29,200
16,750
16,900
4,000
25,770
19,050
43,280
269,600
19,096
45,700
18,000
41,200
3,200
94,300
55,695
646,800
1,471,200
51,480
211,200
5,900
146,000
16,750
33,800
32,000
103,080
38,100
173,120
1,078,400
133,672
274,200
108,000
82,400
67,200
565,800
55,695
215,600
245,200
359,500
26,400
29,200
16,750
4,000
45,700
19,096
3,200
18,000
6,600
43,280
94,300
16,900
54,964
646,800
1,471,200
1,438,000
211,200
116,800
16,750
32,000
182,800
95,480
67,200
108,000
51,480
173,120
565,800
33,800
54,964
215,600
36,050
79,900
646,800
36,050
79,900
Hal. 28
No
Uraian pekerjaan
Side Bracket
Bolt Machine 5/8" x 10"
Pole Band Single Up set 7" atau 7 1/2"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
Satuan
bh
bh
bh
bh
set
Unit
Volume
2
4
1
4
8.6
1
Rp
138,600
76,200
47,300
12,800
56,760
67,917
Hal. 29
No
Uraian pekerjaan
Satuan
Unit
bh
bh
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Volume
1
3
1
2
4
4
7.8
1
1
2
1
1
1
2
1
4
3
3
1
2
8.6
1
1
2
1
1
2
1
3
2
3
7.8
1
1
1
3
1
2
1
4
1
2
1
8.6
1
1
2
2
1
4
2
7.8
1
1
2
4
1
2
4
2
2
3
4
10
Rp
215,600
79,900
69,300
19,050
3,200
6,600
64,999
646,800
79,900
138,600
76,200
12,800
51,480
64,999
215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
29,500
47,300
4,000
6,600
67,917
431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
88,500
47,300
8,000
56,760
67,917
215,600
215,600
269,600
21,950
79,900
3,200
4,000
19,050
6,600
29,500
67,917
431,200
215,600
269,600
43,900
79,900
9,600
8,000
57,150
51,480
29,500
67,917
215,600
36,050
69,300
79,900
19,050
18,540
3,200
29,500
6,600
67,917
646,800
36,050
138,600
79,900
76,200
18,540
6,400
29,500
56,760
67,917
215,600
69,300
79,900
19,050
3,200
6,600
64,999
431,200
138,600
79,900
76,200
6,400
51,480
64,999
215,600
215,600
36,050
269,600
21,950
79,900
19,050
29,200
4,000
3,200
431,200
862,400
36,050
539,200
87,800
159,800
38,100
87,600
16,000
32,000
Hal. 30
No
Uraian pekerjaan
Satuan
Volume
mtr
bh
bh
Unit
16.4
1
2
1
6,600
18,540
29,500
67,917
Rp
108,240
18,540
59,000
67,917
Hal. 31
No
Uraian pekerjaan
123 SC2-A'
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan
124 SC3
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Primary Angle Clamp 150 s/d 240 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Arrmour rod # for AAAC 240 mm2
Pole band single rack 8" x 8 1/2"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Upah Pemasangan
125 SC3'
Isolator Tarik 20 KV ( 2 pcs )
Primary Angle Clamp 150 s/d 240 mm2
Arrmour rod # for AAAC 240 mm2
Oval eye bolt 5/8" x 8"
Pole band single rack 8" x 8 1/2"
Shackle Anchor 5/8
Arrmour rod # for AAAC 150 mm2
Upah Pemasangan
126 SC7
Isolator Tarik 20 KV ( 2 pcs )
Shackle Anchor 5/8
Spool insulator ansi 53-4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Single rack 7" atau 7 1/2"
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Armour tape 1/4" wide
Clevis Swinging Secondary
Primary dead end clamp(150 s/d 240)mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Upah Pemasangan
127 SC7'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary dead end clamp(150 s/d 240)mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
mtr
set
bh
bh
bh
Unit
Unit
bh
bh
set
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Volume
1
2
4
2
4
2
2
2
4
10
15.6
1
1
1
3
1
1
3
0.8
3
4
8
3
1
1
3
3
3
3
4
3
1
1
1
3
3
1
2
4
1
2
2
3
1
3
10
1
1
3
2
4
1
1
3
2
4
2
2
3
3
10
3
3
4
Rp
215,600
215,600
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
29,500
64,999
431,200
862,400
539,200
87,800
159,800
38,100
58,400
16,000
32,000
102,960
29,500
64,999
245,200
41,200
19,050
60,500
6,600
121,250
30,900
3,200
18,000
86,546
735,600
41,200
19,050
181,500
5,280
363,750
123,600
25,600
54,000
86,546
245,200
60,500
121,250
16,750
30,900
18,000
80,800
83,618
735,600
181,500
363,750
50,250
123,600
54,000
80,800
83,618
245,200
18,000
41,200
269,600
21,950
29,500
45,700
19,050
29,200
16,750
19,096
3,200
5,900
19,050
94,300
25,770
4,000
140,340
735,600
54,000
41,200
539,200
87,800
29,500
91,400
38,100
87,600
16,750
57,288
32,000
5,900
19,050
282,900
51,540
16,000
140,340
245,200
269,600
21,950
45,700
19,050
29,200
19,096
3,200
18,000
94,300
4,000
735,600
539,200
87,800
91,400
38,100
87,600
57,288
32,000
54,000
282,900
16,000
Hal. 32
No
Uraian pekerjaan
Upah Pemasangan
Satuan
bh
Volume
1
Rp
140,340
Hal. 33
No
Uraian pekerjaan
128 SC7-A
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Pole Band Single rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Armour tape 1/4" wide
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Shackle Anchor 5/8
Primary dead end clamp(150 s/d 240)mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
129 SC7-A'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary dead end clamp (150 s/d 240)mm2
Upah Pemasangan
130 SC8
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Armour tape 1/4" wide
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Center Bracket 12,5 KN
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan
Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Volume
1
3
1
2
4
2
1
2
3
1
3
1
4
11
1
3
3
2
1
1
3
2
4
2
2
3
1
2
4
4
3
3
1
1
1
2
2
7.8
4
2
3
2
5
1
8
1
4
2
4
2
7
6
2
11
6
1
Rp
245,200
41,200
269,600
21,950
45,700
29,500
19,050
29,200
16,750
19,096
5,900
4,000
3,200
19,050
18,000
94,300
25,770
137,414
735,600
41,200
539,200
87,800
91,400
29,500
38,100
87,600
16,750
57,288
5,900
16,000
35,200
19,050
54,000
282,900
51,540
137,414
245,200
269,600
21,950
45,700
19,050
29,200
16,750
19,096
4,000
3,200
18,000
94,300
67,917
735,600
539,200
87,800
91,400
38,100
87,600
16,750
38,192
16,000
12,800
54,000
282,900
67,917
215,600
215,600
245,200
6,600
26,400
5,900
45,700
19,050
29,200
16,750
4,000
79,900
25,770
19,050
40,000
359,500
19,096
18,000
41,200
3,200
94,300
67,917
215,600
431,200
490,400
51,480
105,600
11,800
137,100
38,100
146,000
16,750
32,000
79,900
103,080
38,100
160,000
719,000
133,672
108,000
82,400
35,200
565,800
67,917
Hal. 34
No
Uraian pekerjaan
Satuan
Volume
131 SC8-A
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Armour tape 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt machine 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Pole band single rack 8" x 8 1/2"
Shackle Anchor 5/8
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan
132 SC8-A'
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Tie Wire #4 / Aluminium Bonding Wire #20
Compression Connector H type 150/240mm2
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan
133 SC9
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Center Bracket 12,5 KN
Bolt machine 5/8" x 10"
Washer Square 2 1/4 "
Cross arm steel 1.500 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole band single rack 8" x 8 1/2"
Pole Band Single Up set 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan
134 SC10
Isolator tumpu (pin post) 20 KV
Bolt machine 5/8" x 10"
Washer Square 2 1/4 "
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole band single rack 8" x 8 1/2"
Pole Band Single Up set 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan
Unit
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
1
3
6
7.8
8
1
5
1
2
8
4
2
4
2
7
4
2
6
2
21
6
1
1
3
6
4
8
2
4
1
8
4
5
21
6
7.8
4
6
1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
1
2
1
3
3
1
1
1
1
1
1
1
1
3
1
1
1
1
1
1
1
1
1
Rp
215,600
245,200
6,600
26,400
5,900
29,200
16,750
19,050
4,000
25,770
19,050
40,000
359,500
19,096
45,700
30,900
18,000
41,200
3,200
94,300
65,924
646,800
1,471,200
51,480
211,200
5,900
146,000
16,750
38,100
32,000
103,080
38,100
160,000
719,000
133,672
182,800
61,800
108,000
82,400
67,200
565,800
65,924
215,600
245,200
359,500
26,400
19,050
29,200
16,750
4,000
45,700
19,096
3,200
18,000
6,600
40,000
94,300
80,390
646,800
1,471,200
1,438,000
211,200
38,100
116,800
16,750
32,000
182,800
95,480
67,200
108,000
51,480
160,000
565,800
80,390
215,600
215,600
79,900
19,050
3,200
269,600
215,200
4,000
30,900
47,300
36,050
80,390
215,600
431,200
79,900
57,150
9,600
269,600
215,200
4,000
30,900
47,300
36,050
80,390
215,600
19,050
3,200
359,500
215,200
4,000
30,900
47,300
36,050
80,390
646,800
19,050
3,200
359,500
215,200
4,000
30,900
47,300
36,050
80,390
Hal. 35
No
Uraian pekerjaan
Satuan
Volume
135 SC 11
Isolator tumpu (pin post) 20 KV
Bolt Double Arming 5/8" x (16 s/d 24")
Washer Square 2 1/4 "
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Spool insulator ansi 53-2
Bracket secondary / bracket insulated
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan
136 SC12
Isolator tumpu (pin post) 20 KV
Bolt Double Arming 5/8" x (16 s/d 24")
Washer Square 2 1/4 "
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.000 mm Galvanis
Bracket secondary / bracket insulated
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Pole Band Single rack 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan
137 DC1
Isolator tumpu (pin post) 20 KV
Bolt Machine 5/8" x 10"
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Single Up set 7" atau 7 1/2"
Pole band single rack 8" x 8 1/2"
Spool insulator ansi 53-2
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
138 DC2
Isolator tumpu (pin post) 20 KV
Bolt Machine 5/8" x 10"
Washer round 3/8"
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Bracket secondary / bracket insulated
Spool insulator ansi 53-2
Bolt Double Arming 5/8" x 14"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
139 DC3
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Primary dead end clamp (150 s/d 240) mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Brace steel 770 mm2
Shackle Anchor 5/8
Pole Band Double Rack 8" atau 8 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
1
6
3
11
2
2
1
1
2
1
1
1
1
6
3
10
2
2
1
2
1
1
1
1
1
6
1
1
1
4
4
1
3
1
1
31
1
1
12
4
4
2
2
8
8
3
1
1
5
32
1
1
12
6
12
8
8
6
1
7
1
1
20
2
Rp
215,600
29,200
3,200
359,500
215,200
36,050
18,540
4,000
51,550
29,500
80,390
1,293,600
87,600
35,200
719,000
430,400
36,050
18,540
8,000
51,550
29,500
80,390
215,600
29,200
3,200
539,400
20,600
18,540
4,000
51,550
29,500
36,050
104,817
1,293,600
87,600
32,000
1,078,800
41,200
18,540
8,000
51,550
29,500
36,050
104,817
215,600
19,050
359,500
539,400
26,400
4,000
47,300
30,900
36,050
3,200
6,600
164,712
1,293,600
19,050
359,500
539,400
105,600
16,000
47,300
92,700
36,050
3,200
204,600
164,712
215,600
19,050
359,500
539,400
539,400
26,400
4,000
51,550
18,540
36,050
29,200
6,600
122,785
2,587,200
76,200
1,438,000
1,078,800
1,078,800
211,200
32,000
154,650
18,540
36,050
146,000
211,200
122,785
215,600
215,600
94,300
4,000
26,400
18,000
51,550
19,096
19,050
41,200
3,200
539,400
2,587,200
1,293,600
1,131,600
32,000
211,200
108,000
51,550
133,672
19,050
41,200
64,000
1,078,800
Hal. 36
No
Uraian pekerjaan
Satuan
bh
bh
bh
bh
Unit
Volume
2
6
1
5
1
Rp
719,000
240,000
19,050
146,000
13,310
Hal. 37
No
Uraian pekerjaan
Satuan
Volume
140 DC4
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt double arming 5/8" x (16" s/d 24")
Brace steel 770 mm2
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Compression Connector H type 240/240mm2
Clevis Swinging Secondary
Armour tape 1/4" wide
Pole Band Double Rack 8" atau 8 1/2"
Oval Eye Nut 5/8"
Oval eye bolt 5/8" x 8"
Primary dead end clamp (150 s/d 240) mm2
Shackle Anchor 5/8
Tie Wire #4 / Aluminium Bonding Wire #20
Washer Square 2 1/4 "
Spool insulator ansi 53-4
Upah Pemasangan
141 DC5
Isolator Tarik 20 KV ( 2 pcs )
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt double arming 5/8" x (16" s/d 24")
Brace steel 770 mm2
Pole Band Double Rack 8" atau 8 1/2"
Primary dead end clamp (150 s/d 240) mm2
Oval Eye Nut 5/8"
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Armour tape 1/4" wide
Upah Pemasangan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
1
12
4
2
4
7
4
2
6
1
1
1
24
12
12
12
15.6
1
1
1
1
6
4
7
4
2
6
7
2
1
1
Rp
245,200
215,600
215,600
4,000
29,200
26,400
539,400
40,000
19,050
5,900
51,550
19,096
16,750
94,300
18,000
6,600
3,200
41,200
130,211
2,942,400
862,400
431,200
16,000
204,400
105,600
1,078,800
240,000
19,050
5,900
51,550
458,304
201,000
1,131,600
216,000
102,960
3,200
41,200
130,211
245,200
4,000
29,200
26,400
51,550
94,300
19,096
539,400
5,900
5,990
1,471,200
16,000
204,400
105,600
103,100
565,800
133,672
1,078,800
5,900
5,990
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Hal. 38
Jumlah Semua
Rp
449,010
373,176
756,562
407,042
655,564
570,708
Hal. 39
Jumlah Semua
Rp
549,260
Hal. 40
Jumlah Semua
Rp
1,285,490
878,839
604,484
408,993
678,484
Hal. 41
Jumlah Semua
Rp
416,764
Hal. 42
Jumlah Semua
Rp
1,146,746
757,817
221,040
197,590
237,940
214,490
254,840
231,390
Hal. 43
Jumlah Semua
Rp
263,290
Hal. 44
Jumlah Semua
Rp
239,840
251,890
225,240
276,690
250,040
301,490
274,840
435,090
408,440
Hal. 45
Jumlah Semua
Rp
412,590
Hal. 46
Jumlah Semua
Rp
328,790
443,661
417,011
435,661
647,600
611,447
209,006
210,256
29,449
18,269
Hal. 47
Jumlah Semua
Rp
685,405
Hal. 48
Jumlah Semua
Rp
696,305
#REF!
666,229
433,948
845,448
431,659
250,906
217,761
89,388
Hal. 49
Jumlah Semua
Rp
2,470,825
Hal. 50
Jumlah Semua
Rp
#REF!
566,376
67,479
325,517
270,961
853,417
461,257
#REF!
323,188
113,267
613,438
Hal. 51
Jumlah Semua
Rp
399,563
Hal. 52
Jumlah Semua
Rp
87,938
142,816
154,474
116,426
89,218
100,982
124,907
197,232
145,072
110,409
Hal. 53
Jumlah Semua
Rp
113,382
Hal. 54
Jumlah Semua
Rp
490,326
398,779
835,987
743,700
580,912
469,408
1,301,154
Hal. 55
Jumlah Semua
Rp
819,454
Hal. 56
Jumlah Semua
Rp
650,999
436,987
729,677
694,574
1,208,881
1,068,276
Hal. 57
Jumlah Semua
Rp
1,065,880
Hal. 58
Jumlah Semua
Rp
747,957
1,821,535
2,585,035
3,515,595
1,663,783
Hal. 59
Jumlah Semua
Rp
1,217,874
Hal. 60
Jumlah Semua
Rp
1,073,697
1,335,659
1,338,577
1,263,847
1,360,999
Hal. 61
Jumlah Semua
Rp
636,097
Hal. 62
Jumlah Semua
Rp
2,530,397
3,125,897
2,499,309
1,657,064
1,313,456
Hal. 63
Jumlah Semua
Rp
1,851,868
2,274,978
2,258,842
1,994,637
Hal. 64
Jumlah Semua
Rp
4,406,897
5,294,797
5,265,394
Hal. 65
Jumlah Semua
Rp
1,162,327
Hal. 66
Jumlah Semua
Rp
1,070,779
1,414,677
1,263,847
1,156,667
848,779
Hal. 67
Jumlah Semua
Rp
2,543,847
Hal. 68
Jumlah Semua
Rp
2,422,359
1,636,126
1,673,118
2,326,168
Hal. 69
Jumlah Semua
Rp
2,162,228
Hal. 70
Jumlah Semua
Rp
2,326,442
2,068,259
3,769,099
Hal. 71
Jumlah Semua
Rp
4,907,206
5,282,000
1,476,890
1,442,390
Hal. 72
Jumlah Semua
Rp
2,789,830
2,781,657
2,881,712
7,191,425
Hal. 73
Jumlah Semua
Rp
7,889,232
Hal. 74
Jumlah Semua
Rp
8,241,775
3,690,462
:
:
:
:
NO.
SNI
KODE
03-2835-2002
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PEKERJAAN PERSIAPAN
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
Pengukuran dan Pemasangan Bouwplank
Membersihkan Lapangan dan Perataan
Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm
Bongkaran Beton Bertulang
Bongkaran Dinding Tembok Bata Merah
m'
m'
m2
m2
m3
m3
DT 91-0006
2007
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PEKERJAAN TANAH
Galian Tanah Biasa Sedalam 1 m
Galian Tanah Keras Sedalam 1 m
Galian Tanah Cadas Sedalam 1 m
Galian Tanah Lumpur Sedalam 1 m
Pekerjaan Striping Tebing Setinggi 1 m
MembuangTanah sejauh 30 m'
Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
Pemadatan Tanah (per 20 cm)
Urugan Pasir
Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL
Pemasangan Lapisan Ijuk tebal 10 cm
Urugan Sirtu
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m2
m3
DT 91-0007
2007
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PEKERJAAN PONDASI
Pasang Pondasi Batu Kali 1Pc : 3 PP
Pasang Pondasi Batu Kali 1Pc : 5 PP
6
D.6.2
D.6.3
D.6.4
D.6.5
D.6.5
#REF!
#REF!
D.6.9
D.6.10
D.6.11
#REF!
PEKERJAAN DINDING
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PEKERJAAN PLESTERAN
Plesteran 1 Pc : 1 Pp Tebal 15 mm
Plesteran 1 Pc : 2 Psr : Tebal 15 mm
Plesteran 1 Pc : 3 Pp Tebal 15 mm
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m2
m2
6
#REF!
#REF!
PEKERJAAN KAYU
Membuat Kosen Pintu & Jendela Kayu klas I
Membuat Kosen Pintu & Jendela Kayu klas II (Bengkir)
m3
m3
II
III
IV
DT 91-0009
2007
DT 91-0010
2007
VI
DT 91-0011
2007
URAIAN PEKERJAAN
SAT
#REF!
Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP
Pasang Pondasi Batu Kosong
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah
Pasang Pondasi Sumuran diameter 100 cm
#REF!
#REF!
#REF!
#REF!
#REF!
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Pp
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Pp
#REF!
#REF!
#REF!
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Pp
#REF!
#REF!
#REF!
Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm
Plesteran 1Pc : 3Pp Tebal 20 mm
#REF!
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Hal. 75
NO.
SNI
KODE
#REF!
URAIAN PEKERJAAN
Membuat Kosen Pintu & Jendela Kayu klas III (Kruing)
SAT
m3
Hal. 76
NO.
VII
SNI
DT 91-0008
2007
KODE
URAIAN PEKERJAAN
SAT
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
F.6.21c
F.6.22a
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PEKERJAAN BETON
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
Membuat Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52
Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm, w/c = 0,49
Pembesian dg Besi Polos
Pembesian dg Besi Ulir
Kabel Presstresed Polos/strand
Jaring Kawat baja/Wire Mesh
Memasang Bekisting untuk Pondasi
Memasang Bekisting untuk Sloof
Memasang Bekisting untuk Kolom
Memasang Bekisting untuk Balok
Memasang Bekisting untuk Lantai
Memasang Bekisting untuk Dinding
Memasang Bekisting untuk Tangga
Memasang Jembatan Cor
Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)
Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Kg
Kg
Kg
Kg
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
Hal. 77
NO.
SNI
KODE
#REF!
#REF!
#REF!
URAIAN PEKERJAAN
Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)
Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)
Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
SAT
m3
m3
m3
Hal. 78
NO.
VIII
IX
SNI
KODE
URAIAN PEKERJAAN
SAT
#REF!
#REF!
SPL.1
SPL.1a
SPL.2
SPL.2a
SPL.3
SPL.3a
SPL.4
SPL.4a
SPL.5
SPL.5a
SPL.6
SPL.7
SPL.8
SPL.9
SPL.10
m'
m'
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
m2
m2
m2
m2
m2
m'
m'
m'
m'
m'
m2
m2
m2
m2
m2
m'
m2
m2
DT 91-0013
2007
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, 4 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, 6 mm
Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm
Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm
List Langit-Langit Kayu Profil
m2
m2
m2
m2
m2
m2
m'
03-
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
J.6.35a
J.6.35b
#REF!
PEKERJAAN SANITASI
Memasang Closet Duduk / Mono Blok
Memasang Closet Jongkok Porselen
Memasang Urinoir
Memasang Wastafel
Memasang Bak Mandi Batu Bata Vol. 0,30 m3
Memasang Pipa Beton, 15 cm - 20 cm
Memasang Pipa Beton, 30 cm - 100 cm
Memasang Pipa Beton, 30 cm
Memasang Pipa Beton, 40 cm
Memasang Pipa Beton, 50 cm
Memasang Pipa Beton, 60 cm
Memasang Pipa Beton, 80 cm
Memasang Pipa Galvanis "
Memasang Pipa Galvanis 3"
Memasang Pipa Galvanis 4"
Memasang Pipa PVC type AW "
Memasang Pipa PVC type AW 2"
Memasang Pipa PVC type AW 3"
Memasang Bak Cuci Piring Stainles Steel
Memasang Kran 1/2"
Memasang Kran 3/4"
Memasang Floor Drain
03-3436-2002
Unit
Unit
Unit
Unit
Unit
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
Buah
Buah
Buah
Buah
Hal. 79
NO.
SNI
KODE
URAIAN PEKERJAAN
SAT
Hal. 80
NO.
SNI
KODE
XI
DT 91-0014
2007
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
03-
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
XII
XIII
XIV
DT 91-0012
03-24
6
#REF!
M.6.34
M.6.34a
#REF!
M.6.35a
#REF!
#REF!
#REF!
#REF!
#REF!
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
URAIAN PEKERJAAN
SAT
Kg
kg
100 kg
m2
cm
m2
m2
m2
m2
m2
m2
m'
m'
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Hal. 81
NO.
SNI
KODE
XV
ANALISA HASIL PERHITUNGAN #REF!
SENDIRI
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
XVI
URAIAN PEKERJAAN
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
PEKERJAAN JALAN
K 730
K. 810
K. 011 a
K. 017
K. 026
K. T01
K. T02
K. T03
K. T05
K. T06
K. 035
K. T06 a
K. 322
K. 325
K. T05a
K. T05b
K. T05c
BOW.G.5b
3.1.(1)a
XVII
1
2
3
4
SAT
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
Ton
m3
m2
m2
m2
m2
m2
m2
m2
m3
m2
m3
m3
m3
m3
m3
m3
m3
m2
m3
Ton
m2
m2
m2
kg
m2
Ton
m2
m3
m3
kg
kg
kg
m3
m3
Pas.
Pas.
Pas.
Pas.
CA1
CA1'
CA2-1
CA2
Unit
Unit
Unit
Unit
Hal. 82
NO.
5
6
SNI
KODE
CA2'
CA3
URAIAN PEKERJAAN
Pas. CA2'
Pas. CA3
SAT
Unit
Unit
Hal. 83
NO.
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
SNI
KODE
CA3'
CA4
CA4'
CA5
CA5'
CA5-1
CA5-1'
CA6
CA6'
SE 1-2 ( 7 M)
E 1-2 ( 7 M )
SE 1-2 ( 9 M)
E 1-2 ( 9 M )
SE 1-2 ( 11 M)
E 1-2 ( 11 M )
SE 1-2 ( 12 M)
E 1-2 ( 12 M )
SE 1-2 ( 7 M)
E 1-2 ( 7 M )
SE 1-2 ( 9 M)
E 1-2 ( 9 M )
SE 1-2 ( 11 M)
E 1-2 ( 11 M )
SE 1-2 ( 12 M)
E 1-2 ( 12 M )
SE1-3 (11 M)
E1-3(11 M)
SE1-3 (12 M)
E1-3 (12 M)
SE2-2
SE2-3
E2-3
F 1-2
F 1-3
J5-T (CJ2)
J7 - T (CJ3)
J6 - T (CJ4)
MJ6 - T (CJ4)
CG105 - 50
P.12
P12.C
P12.C'
CM5 - 2
CM2-11
CM2 - 12
CM2 - 12A
CM2-15
CM3-4
CM2-11 M
CM5-3
CM5-4
CM5-5
CM5-6
CM5-8
CM5-9
CM5-12
CM5-13
CM5-16
CM5-20
CJ5
CJ6
CJ6X / SJ6X
CJ7
CJ8
CJ10
SJ5
SJ6
SJ7
SJ8
SJ10
URAIAN PEKERJAAN
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
CA3'
CA4
CA4'
CA5
CA5'
CA5-1
CA5-1'
Pas. CA6
Pas. CA6'
Pas. SE 1-2 ( 7 M)
Pas. E 1-2 ( 7 M )
Pas. SE 1-2 ( 9 M)
Pas. E 1-2 ( 9 M )
Pas. SE 1-2 ( 11 M)
Pas. E 1-2 ( 11 M )
Pas. SE 1-2 ( 12 M)
Pas. E 1-2 ( 12 M )
Pas. SE 1-2 ( 7 M)
Pas. E 1-2 ( 7 M )
Pas. SE 1-2 ( 9 M)
Pas. E 1-2 ( 9 M )
Pas. SE 1-2 ( 11 M)
Pas. E 1-2 ( 11 M )
Pas. SE 1-2 ( 12 M)
Pas. E 1-2 ( 12 M )
Pas. SE1-3 (11 M)
Pas. E1-3(11 M)
Pas. SE1-3 (12 M)
Pas. E1-3 (12 M)
Pas. SE2-2
Pas. SE2-3
Pas. E2-3
Pas. F 1-2
Pas. F 1-3
Pas. J5-T (CJ2)
Pas. J7 - T (CJ3)
Pas. J6 - T (CJ4)
Pas. MJ6 - T (CJ4)
Pas. CG105 - 50
Pas. P.12
Pas. P12.C
Pas. P12.C'
Pas. CM5 - 2
Pas. CM2-11
Pas. CM2 - 12
Pas. CM2 - 12A
Pas. CM2-15
Pas. CM3-4
Pas. CM2-11 M
Pas. CM5-3
Pas. CM5-4
Pas. CM5-5
Pas. CM5-6
Pas. CM5-8
Pas. CM5-9
Pas. CM5-12
Pas. CM5-13
Pas. CM5-16
Pas. CM5-20
Pas. CJ5
Pas. CJ6
Pas. CJ6X / SJ6X
Pas. CJ7
Pas. CJ8
Pas. CJ10
Pas. SJ5
Pas. SJ6
Pas. SJ7
Pas. SJ8
Pas. SJ10
SAT
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Hal. 84
NO.
77
78
SNI
KODE
SA1
SA1'
URAIAN PEKERJAAN
Pas. SA1
Pas. SA1'
SAT
Unit
Unit
Hal. 85
NO.
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
SNI
KODE
SA2
SA2'
SA3
SA3'
SA4
SA4'
SA5
SA5'
SA5-1
SA5-1'
SA6
SA6'
B1
B1A
B2
B3
B4
B5
CC1
CC1'
CC1-1
CC1-A
CC.1-A'
CC.2
CC.2'
CC2 - A
CC2-1
CC2 - A'
CC.3
CC.3'
CC 7
CC 7'
CC 7 A
CC 7 A'
CC 8
CC 8 - A
CC 8 A'
SC . 1
SC. 1'
SC . 1 - A
SC 1 - A '
SC 2
SC 2 '
SC2-A
SC2-A'
SC3
SC3'
SC7
SC7'
SC7-A
SC7-A'
SC8
SC8-A
SC8-A'
SC9
SC10
SC 11
URAIAN PEKERJAAN
Pas. SA2
Pas. SA2'
Pas. SA3
Pas. SA3'
Pas. SA4
Pas. SA4'
Pas. SA5
Pas. SA5'
Pas. SA5-1
Pas. SA5-1'
Pas. SA6
Pas. SA6'
Pas. B1
Pas. B1A
Pas. B2
Pas. B3
Pas. B4
Pas. B5
Pas. CC1
Pas. CC1'
Pas. CC1-1
Pas. CC1-A
Pas. CC.1-A'
Pas. CC.2
Pas. CC.2'
Pas. CC2 - A
Pas. CC2-1
Pas. CC2 - A'
Pas. CC.3
Pas. CC.3'
Pas. CC 7
Pas. CC 7'
Pas. CC 7 A
Pas. CC 7 A'
Pas. CC 8
Pas. CC 8 - A
Pas. CC 8 A'
Pas. SC . 1
Pas. SC. 1'
Pas. SC . 1 - A
Pas. SC 1 - A '
Pas. SC 2
Pas. SC 2 '
Pas. SC2-A
Pas. SC2-A'
Pas. SC3
Pas. SC3'
Pas. SC7
Pas. SC7'
Pas. SC7-A
Pas. SC7-A'
Pas. SC8
Pas. SC8-A
Pas. SC8-A'
Pas. SC9
Pas. SC10
Pas. SC 11
SAT
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Hal. 86
NO.
136
137
138
139
140
141
SNI
KODE
SC12
DC1
DC2
DC3
DC4
DC5
URAIAN PEKERJAAN
Pas. SC12
Pas. DC1
Pas. DC2
Pas. DC3
Pas. DC4
Pas. DC5
SAT
Unit
Unit
Unit
Unit
Unit
Unit
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Hal. 87
HARGA SATUAN
PEKERJAAN
(Rp)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#NAME?
#NAME?
Hal. 88
HARGA SATUAN
PEKERJAAN
(Rp)
#NAME?
Hal. 89
HARGA SATUAN
PEKERJAAN
(Rp)
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Hal. 90
HARGA SATUAN
PEKERJAAN
(Rp)
#REF!
#REF!
#REF!
Hal. 91
HARGA SATUAN
PEKERJAAN
(Rp)
#REF!
#REF!
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
Hal. 92
HARGA SATUAN
PEKERJAAN
(Rp)
Hal. 93
HARGA SATUAN
PEKERJAAN
(Rp)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
Hal. 94
HARGA SATUAN
PEKERJAAN
(Rp)
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#NAME?
#REF!
449,010.00
373,176.00
756,562.00
407,042.00
Hal. 95
HARGA SATUAN
PEKERJAAN
(Rp)
655,564.00
570,708.00
Hal. 96
HARGA SATUAN
PEKERJAAN
(Rp)
549,260.00
1,285,490.00
878,839.00
604,484.00
408,993.00
678,484.00
416,764.00
1,146,746.00
757,817.00
221,040.00
197,590.00
237,940.00
214,490.00
254,840.00
231,390.00
263,290.00
239,840.00
251,890.00
225,240.00
250,040.00
250,040.00
301,490.00
274,840.00
435,090.00
408,440.00
412,590.00
328,790.00
443,661.00
417,011.00
435,661.00
647,600.00
611,447.00
209,006.00
210,256.00
29,449.00
18,269.00
685,405.00
696,305.00
#REF!
666,229.00
433,948.00
845,448.00
431,659.00
250,906.00
217,761.00
89,388.00
2,470,825.00
#REF!
566,376.00
67,479.00
325,517.00
270,961.00
853,417.00
461,257.00
#REF!
323,188.00
113,267.00
613,438.00
399,563.00
87,938.00
142,816.00
154,474.00
116,426.00
89,218.00
100,982.00
124,907.00
197,232.00
145,072.00
110,409.00
113,382.00
Hal. 97
HARGA SATUAN
PEKERJAAN
(Rp)
490,326.00
398,779.00
Hal. 98
HARGA SATUAN
PEKERJAAN
(Rp)
835,987.00
743,700.00
580,912.00
469,408.00
1,301,154.00
819,454.00
650,999.00
436,987.00
729,677.00
694,574.00
1,208,881.00
1,068,276.00
1,065,880.00
747,957.00
1,821,535.00
2,585,035.00
3,515,595.00
1,663,783.00
1,217,874.00
1,073,697.00
1,335,659.00
1,338,577.00
1,263,847.00
1,360,999.00
636,097.00
2,530,397.00
3,125,897.00
2,499,309.00
1,657,064.00
1,313,456.00
1,851,868.00
2,274,978.00
2,258,842.00
1,994,637.00
4,406,897.00
5,294,797.00
5,265,394.00
1,162,327.00
1,070,779.00
1,414,677.00
1,263,847.00
1,156,667.00
848,779.00
2,543,847.00
2,422,359.00
1,636,126.00
1,673,118.00
2,326,168.00
2,162,228.00
2,326,442.00
2,068,259.00
3,769,099.00
4,907,206.00
5,282,000.00
1,476,890.00
1,442,390.00
2,789,830.00
Hal. 99
HARGA SATUAN
PEKERJAAN
(Rp)
2,781,657.00
2,881,712.00
7,191,425.00
7,889,232.00
8,241,775.00
3,690,462.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Hal. 100
No.
URAIAN
:
:
:
:
KO
DE
HP
KAP.
E01
294.0
60.0
ASPHALT FINISHER
E02
72.4
10.0
ASPHALT SPRAYER
E03
4.0
850.0
BULLDOZER 100-150 HP
E04
155.0 -
E05
60.0
5,000.0
E06
20.0
500.0
E07
138.0
15.0
E08
100.0
3.5
E09
190.0
10.0
10
EXCAVATOR 80-140 HP
E10
133.0
0.9
11
E11
190.0
10.0
12
GENERATOR SET
E12
180.0
135.0
13
E13
135.0
10,800.0
14
E14
70.0
0.8
15
E15
96.0
1.5
16
E16
55.0
8.0
17
E17
82.0
8.1
18
E18
100.5
9.0
19
E19
82.0
7.1
20
CONCRETE VIBRATOR
E20
5.5
25.0
21
STONE CRUSHER
E21
220.0
60.0
22
E22
23
E23
100.0
4,000.0
24
PEDESTRIAN ROLLER
E24
8.8
835.00
25
TAMPER
E25
4.7
121.00
26
JACK HAMMER
E26
0.0
1,330.00
27
FULVI MIXER
E27
345.0
2,005.00
28
CONCRETE PUMP
E28
100.0
8.00
29
TRAILER 20 TON
E29
175.0
20.00
30
E30
25.0
2.50
31
E31
125.0
35.0
6.0 -
32
WELDING SET
E32
40.0
250.0
33
E33
150.0
2,000.0
34
E34
5.0
1,000.0
35
TRONTON
E35
150.0
15.0
36
COLD MILLING
E36
248.0
1,000.0
37
E37
3.0 -
KODE :
(33)
KABUPATEN :
TEGAL
KODE
K. 637a
KODE :
(28)
DISIAPKAN OLEH :
BINA PROGRAM
URAIAN :
ANGGAPAN/ASUMSI :
PEKERJA
P
E
K
E
R
J
A
Mandor
Operator terlatih
Buruh tak terlatih
Buruh terlatih
Supir
VOL
HARI
2
2
66
2
1
KODE
3
3
3
3
3
TOTAL VOL
(org.hari)
L03
L04
L101
L104
L06
6
6
198
6
3
U PAH
Rp./hari/orang
75,000.00
65,000.00
45,000.00
60,000.00
60,000.00
PERIODE :
MARET 2015
B IAYA
(Rp.)
450,000.00
390,000.00
8,910,000.00
360,000.00
180,000.00
buruh
MAT E R IAL
M
A
T
E
R
I
A
L
///////////////////
///////////////////
SATUAN
KODE
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
m3
m3
m3
m3
m3
kg
m3
set
M10a
M10b
-
TOTAL
VOL
HARGA
(Rp./unit)
62.00
16.60
14.20
11.10
1.00
5,500.00
14.00
8.00
176,860.58
170,588.47
187,314.11
208,221.16
161,083.87
9,155.27
120,000.00
50,000.00
B IAYA
(Rp.)
P
E
R
A
L
A
T
A
N
Overhead + Provit
JUMLAH
HARI
KERJA
1
KODE
JAM
KERJA
E16
B IAYA
(Rp. / jam )
15
230,253.72
B IAYA
(Rp.)
70 m3
71,363,315.53
SUB TOTAL
(Rp.)
PERALATAN
3,453,805.78
TOTAL (Rp.)
85,107,121.31
15%
SUB TOTAL
(Rp.)
3,453,805.78
12,766,068.20
JUMLAH
VOLUME/QUANTITY
10,290,000.00
10,965,355.96
2,831,768.60
2,659,860.36
2,311,254.88
161,083.87
50,353,991.86
1,680,000.00
400,000.00
MATERIAL
P E R A LATA N
SUB TOTAL
(Rp.)
1,398,188.42 per m3
97,873,189.51
KODE :
(33)
KABUPATEN :
TEGAL
KODE :
(28)
KODE
K. 618a
DISIAPKAN OLEH :
BINA PROGRAM
PERIODE :
MARET 2015
URAIAN :
ANGGAPAN/ASUMSI :
PEKERJA
P
E
K
E
R
J
A
Mandor
Operator terlatih
Buruh tak terampil
Buruh terampil
Supir
VOL
HARI
2
2
66
2
1
KODE
3
3
3
3
3
TOTAL VOL
(org.hari)
L03
L04
L101
L104
L06
6
6
198
6
3
U PAH
Rp./hari/orang
75,000.00
65,000.00
45,000.00
60,000.00
60,000.00
B IAYA
(Rp.)
450,000.00
390,000.00
8,910,000.00
360,000.00
180,000.00
buruh
MAT E R IAL
M
A
T
E
R
I
A
L
Batu pecah
Batu pecah
Batu pecah
Batu pecah
Abu batu
Aspal
Kayu Bakar
Alat bantu
3-5 cm
2-3 cm
1-2 cm
0,5 - 1 cm
///////////////////
///////////////////
SATUAN
KODE
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
m3
m3
m3
m3
m3
kg
m3
set
M10a
M10b
-
TOTAL
VOL
HARGA
(Rp./unit)
52.50
30.60
10.57
9.14
1.22
6,270.00
14.00
8.00
176,860.58
170,588.47
187,314.11
208,221.16
161,083.87
9,155.27
120,000.00
50,000.00
B IAYA
(Rp.)
P
E
R
A
L
A
T
A
N
Overhead + Provit
JUMLAH
HARI
KERJA
1
KODE
JAM
KERJA
E16
B IAYA
(Rp. / jam )
15
230,253.72
B IAYA
(Rp.)
1400 m2
78,068,312.21
SUB TOTAL
(Rp.)
PERALATAN
3,453,805.78
TOTAL (Rp.)
91,812,117.99
15%
SUB TOTAL
(Rp.)
3,453,805.78
13,771,817.70
JUMLAH
VOLUME/QUANTITY
10,290,000.00
9,285,180.45
5,220,007.18
1,979,910.14
1,903,141.40
196,522.32
57,403,550.72
1,680,000.00
400,000.00
MATERIAL
P E R A LATA N
SUB TOTAL
(Rp.)
75,417.10 per m2
105,583,935.69
KODE :
(33)
KABUPATEN :
TEGAL
KODE
K. 615a
KODE :
(28)
DISIAPKAN OLEH :
BINA PROGRAM
PERIODE :
MARET 2015
URAIAN :
ANGGAPAN/ASUMSI :
PEKERJA
P
E
K
E
R
J
A
Mandor
Operator terlatih
Supir
Buruh tak terlatih
Buruh semi terlatih
Buruh terlatih
VOL
HARI
1
1
2
15
2
2
KODE
3
3
3
3
3
3
TOTAL VOL
(org.hari)
L03
L04
L06
L101
L103
L104
3
3
6
45
6
6
U PAH
Rp./hari/orang
75,000.00
65,000.00
-45,000.00
50,000.00
60,000.00
B IAYA
(Rp.)
225,000.00
195,000.00
-2,025,000.00
300,000.00
360,000.00
buruh
MAT E R IAL
M
A
T
E
R
I
A
L
Aspal
Kayu Bakar
Batu pecah tersaring
Alat bantu
///////////////////
///////////////////
SATUAN
KODE
///////////////////
///////////////////
///////////////////
///////////////////
kg
m3
m3
set
M10a
M10b
-
TOTAL
VOL
HARGA
(Rp./unit)
3,745.00
14.00
36.00
1.50
9,155.27
120,000.00
327,944.45
50,000.00
B IAYA
(Rp.)
P
E
R
A
L
A
T
JUMLAH
HARI
KERJA
1
1
1
2
1
2
KODE
3
3
3
3
3
3
JAM
KERJA
E16
-
B IAYA
(Rp. / jam )
15
15
15
30
15
30
-230,253.72
-----
3,105,000.00
SUB TOTAL
(Rp.)
34,286,490.82
1,680,000.00
11,806,000.30
75,000.00
MATERIAL
P E R A LATA N
SUB TOTAL
(Rp.)
B IAYA
(Rp.)
47,847,491.12
SUB TOTAL
(Rp.)
-3,453,805.78
-----
A
N
Overhead + Provit
PERALATAN
3,453,805.78
TOTAL (Rp.)
54,406,296.91
15%
8,160,944.54
JUMLAH
VOLUME/QUANTITY
1800 M2
34,759.58 per M2
62,567,241.44
KODE :
(33)
KABUPATEN :
TEGAL
KODE
K. 617a
KODE :
(28)
DISIAPKAN OLEH :
BINA PROGRAM
PERIODE :
MARET 2015
URAIAN :
ANGGAPAN/ASUMSI :
PEKERJA
P
E
K
E
R
J
A
Mandor
Operator terlatih
Supir
Buruh tak terlatih
Buruh terlatih
Buruh semi terlatih
VOL
HARI
1
2
2
15
2
2
KODE
4
4
4
4
4
4
TOTAL VOL
(org.hari)
L03
L04
L06
L101
L104
L103
4
8
8
60
8
8
U PAH
Rp./hari/orang
75,000.00
65,000.00
-45,000.00
60,000.00
50,000.00
B IAYA
(Rp.)
300,000.00
520,000.00
-2,700,000.00
480,000.00
400,000.00
buruh
MAT E R IAL
M
A
T
E
R
I
A
L
///////////////////
///////////////////
SATUAN
KODE
///////////////////
///////////////////
///////////////////
///////////////////
m3
kg
m3
set
M10a
M10b
M170
TOTAL
VOL
HARGA
(Rp./unit)
54.00
6,085.00
14.00
2.50
327,944.45
9,155.27
120,000.00
50,000.00
B IAYA
(Rp.)
JUMLAH
HARI
KERJA
KODE
JAM
KERJA
B IAYA
(Rp. / jam )
B IAYA
(Rp.)
P
E
1
1
3
3
E401
E080
15
15
E153
15
--
--
E211
15
--
--
L
A
T
A
N
Wheel Tracktor 60 HP
Chipspreader
1
2
3
3
E053
E130
15
30
---
---
Overhead + Provit
-230,253.72
1800 M2
75,223,826.00
SUB TOTAL
(Rp.)
PERALATAN
3,453,805.78
TOTAL (Rp.)
83,077,631.78
15%
SUB TOTAL
(Rp.)
-3,453,805.78
12,461,644.77
JUMLAH
VOLUME/QUANTITY
4,400,000.00
17,709,000.45
55,709,825.54
1,680,000.00
125,000.00
MATERIAL
P E R A LATA N
SUB TOTAL
(Rp.)
53,077.38 per M2
95,539,276.54
KODE :
(33)
KABUPATEN :
TEGAL
KODE :
(28)
KODE
K. 516
DISIAPKAN OLEH :
BINA PROGRAM
URAIAN :
ANGGAPAN/ASUMSI :
PEKERJA
P
E
K
E
R
J
A
Mandor
Operator terlatih
Buruh tak terlatih
VOL
HARI
3
1
99
KODE
1
1
1
TOTAL VOL
(org.hari)
L03
L04
L101
U PAH
Rp./hari/orang
3
1
99
75,000.00
65,000.00
45,000.00
PERIODE :
MARET 2015
B IAYA
(Rp.)
225,000.00
65,000.00
4,455,000.00
buruh
MAT E R IAL
M
A
T
E
R
I
A
L
///////////////////
///////////////////
SATUAN
KODE
///////////////////
///////////////////
///////////////////
///////////////////
m3
m3
m3
set
M06
M44
-
TOTAL
VOL
HARGA
(Rp./unit)
50.00
20.00
30.00
4.00
195,400.00
165,000.00
132,400.00
50,000.00
B IAYA
(Rp.)
JUMLAH
HARI
KERJA
1
KODE
JAM
KERJA
E16
B IAYA
(Rp. / jam )
5
230,253.72
4,745,000.00
SUB TOTAL
(Rp.)
9,770,000.00
3,300,000.00
3,972,000.00
200,000.00
MATERIAL
P E R A LATA N
SUB TOTAL
(Rp.)
B IAYA
(Rp.)
17,242,000.00
SUB TOTAL
(Rp.)
1,151,268.59
E
R
A
L
A
T
A
N
Overhead + Provit
15%
JUMLAH
VOLUME/QUANTITY
80 M3
332,612.61 m3
PERALATAN
1,151,268.59
TOTAL (Rp.)
23,138,268.59
3,470,740.29
26,609,008.88
KODE :
(33)
KABUPATEN :
TEGAL
URAIAN :
1. Suplier mengirim matrial sampai bin spreader
2. Matrial dihampar dengan spreader dan dipadatkan
dengan mesin gilas roda baja
PEKERJA
P
E
K
E
R
J
A
Mandor
Operator terlatih
Buruh tak terlatih
Buruh semi terlatih
KODE :
(28)
KODE
K. 621b
DISIAPKAN OLEH :
BINA PROGRAM
TANGGAL :
MARET 2015
ANGGAPAN/ASUMSI :
1. Menggunakan tenaga buruh 400 m2/hari
2. Pasir aspal dikirim oleh levelansier ketempat buruhan
3. Rata - rata tebal lapisan padat berkisar antara 1,5 cm s/d 2 cm
VOL
HARI
1
1
25
10
KODE
1
1
1
1
TOTAL VOL
(org.hari)
L03
L04
L101
L103
U PAH
Rp./hari/orang
1
1
25
10
75,000.00
65,000.00
45,000.00
50,000.00
B IAYA
(Rp.)
75,000.00
65,000.00
1,125,000.00
500,000.00
buruh
MAT E R IAL
M
A
T
E
R
I
A
L
///////////////////
///////////////////
SATUAN
KODE
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
kg
m3
m3
kg
m3
set
M10a
M10a
M10b
-
TOTAL
VOL
HARGA
(Rp./unit)
1,371.40
6.86
1.57
100.57
14.00
1.00
9,155.27
208,221.16
161,083.87
9,155.27
120,000.00
50,000.00
B IAYA
(Rp.)
JUMLAH
HARI
KERJA
KODE
JAM
KERJA
B IAYA
(Rp. / jam )
E16
230,253.72
Overhead + Provit
B IAYA
(Rp.)
400 M2
SUB TOTAL
(Rp.)
PERALATAN
1,151,268.59
TOTAL (Rp.)
19,803,852.04
15%
16,887,583.45
--
2,970,577.81
JUMLAH
VOLUME/QUANTITY
SUB TOTAL
(Rp.)
1,151,268.59
--
R
A
L
A
T
A
N
1,765,000.00
12,555,538.99
1,428,397.16
252,901.68
920,745.63
1,680,000.00
50,000.00
MATERIAL
P E R A LATA N
SUB TOTAL
(Rp.)
56,936.07 per M2
22,774,429.85
KODE :
(33)
KABUPATEN :
TEGAL
URAIAN :
1. Mengupas dan membuang semak - semak dengan
tenaga manusia pada DMJ (Daerah milik jalan )
PEKERJA
P
E
K
E
R
J
A
Mandor
Buruh tak terlatih
KODE :
(28)
KODE
K. 210
DISIAPKAN OLEH :
BINA PROGRAM
TANGGAL :
MARET 2015
ANGGAPAN/ASUMSI :
1. Menngunakan tenaga manusia (9 m x 100 m/hari
2. Hasil kerja 25 m2/orang hari
3. Menggunakan alat bantu rata-rata 1 bulan orang
4. Bakarlah sampah ditempat buruhan
VOL
HARI
1
36
KODE
1
1
TOTAL VOL
(org.hari)
L03
L101
1
36
U PAH
Rp./hari/orang
75,000.00
45,000.00
B IAYA
(Rp.)
75,000.00
1,620,000.00
buruh
MAT E R IAL
M
A
T
E
R
Alat bantu
///////////////////
///////////////////
SATUAN
KODE
///////////////////
set
TOTAL
VOL
1.50
HARGA
(Rp./unit)
50,000.00
SUB TOTAL
(Rp.)
B IAYA
(Rp.)
1,695,000.00
SUB TOTAL
(Rp.)
75,000.00
I
A
L
MATERIAL
P E R A LATA N
JUMLAH
HARI
KERJA
KODE
JAM
KERJA
B IAYA
(Rp. / jam )
P
E
R
A
L
A
T
A
N
Overhead + Provit
15%
900 m2
SUB TOTAL
(Rp.)
PERALATAN
0.00
TOTAL (Rp.)
1,770,000.00
265,500.00
JUMLAH
VOLUME/QUANTITY
B IAYA
(Rp.)
75,000.00
2,035,500.00
2,261.67 m2
KODE :
(33)
KABUPATEN :
TEGAL
URAIAN :
KODE
K. T04
KODE :
(28)
DISIAPKAN OLEH :
BINA PROGRAM
TANGGAL :
MARET 2015
ANGGAPAN/ASUMSI :
1. Permukaan yang akan diprime coat sudah dipadatkan terlebih dahulu
2. Semprotkan campuran prime coat 2 lt/m2
3. Biarkan permukaan yang sudah diprime coat minimal 24 jam, dan dijaga
jangan dilewati kendaraan atau kena hujan
PEKERJA
VOL
HARI
KODE
TOTAL VOL
(org.hari)
U PAH
Rp./hari/orang
B IAYA
(Rp.)
P
E
K
Mandor
Operator
Buruh semi terlatih
1
1
4
1
1
1
L03
L04
L103
1
1
4
75,000.00
65,000.00
50,000.00
75,000.00
65,000.00
200,000.00
L 101
45,000.00
90,000.00
SUB TOTAL
(Rp.)
R
J
A
buruh
MAT E R IAL
M
A
T
E
R
I
A
L
Aspal curah
Minyak aspal
Kayu Bakar
Alat bantu
///////////////////
///////////////////
SATUAN
KODE
///////////////////
///////////////////
///////////////////
///////////////////
Kg
Lt
m3
Set
M10
M11
M10b
-
TOTAL
VOL
HARGA
(Rp./unit)
640.00
320.00
2.50
2.00
7,631.33
6,500.00
120,000.00
50,000.00
B IAYA
(Rp.)
P
E
R
A
L
A
T
A
N
Asphal spreyer
JUMLAH
HARI
KERJA
1
Overhead + Provit
KODE
JAM
KERJA
E03
B IAYA
(Rp. / jam )
B IAYA
(Rp.)
--
--
15%
800 m2
7,364,048.90
SUB TOTAL
(Rp.)
PERALATAN
0.00
TOTAL (Rp.)
7,794,048.90
1,169,107.33
JUMLAH
VOLUME/QUANTITY
SUB TOTAL
(Rp.)
4,884,048.90
2,080,000.00
300,000.00
100,000.00
MATERIAL
P E R A LATA N
430,000.00
11,203.95 m2
8,963,156.23
NO
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
URAIAN
SAT.
BAHAN DASAR
Abu Batu
Batu Bata 3 x 11 x 22 (20)
Bata Hebel (10x20x40)
Batako Berlubang Hollow Blok HB-20
Batako Berlubang Hollow Blok HB-15
Batako Berlubang Hollow Blok HB-10
Batu kali pecah
Batu Blonos
Batu pecah dg mesin (0,5-<1 cm) (Screening)
Batu pecah dg mesin (1-2cm)
Batu pecah dg mesin (2-3 cm)
Batu pecah dg mesin (3-5 cm)
Batu pecah dg tangan (5-7 cm)
Batu pecah dg mesin (2/3 cm) per kg
Batu/Kerikil Pecah Tersaring
Filler
Kerikil Sungai
Pasir
Pasir (Harga pasir per kg)
Pasir Urug
Pasir Beton
PC Semen Abu - abu ( 50 Kg )
PC Semen Warna ( 40 Kg )
Mortar Perekat Hebel (40 kg) setara MU-380
Sirtu
Tanah Urug
M3
Bh
Bh
Bh
Bh
Bh
M3
M3
M3
M3
M3
M3
M3
Kg
M3
Kg
M3
M3
Kg
M3
M3
Kg
Kg
zak
M3
M3
PENUTUP ATAP
Asbes Gelombang (3,00x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (2,70x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (2,40x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (2,10x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (1,50x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (2,50x0,92)x5 mm
Asbes Gelombang (2,25x0,92)x5 mm
Asbes Gelombang (2,00x0,92)x5 mm
Asbes Gelombang (1,80x0,92)x5 mm
Asbes Gelombang (2,40x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (2,10x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (1,80x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (2,40x0,8)x3,5 mm (gelombang kecil)
Asbes Gelombang (2,10x0,8)x3,5 mm (gelombang kecil)
Asbes Gelombang (1,80x0,8)x3,5 mm (gelombang kecil)
Bubungan Asbes gelombang besar
Bubungan Asbes gelombang kecil
Bubungan Genteng keramik "KIA"
Bubungan Genteng Morando
Bubungan genteng pres jtw isi 4/m2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m'
m'
Bh
Bh
Bh
HARGA SATUAN
(Rp)
161,083.87
1,000.00
12,000.00
2,100.00
1,800.00
1,620.00
195,400.00
176,200.00
208,221.16
187,314.11
170,588.47
176,860.58
165,000.00
121.85
327,944.45
1,400.00
103,200.00
158,300.00
117.26
132,400.00
174,500.00
1,500.00
2,300.00
155,000.00
122,900.00
104,700.00
77,700.00
84,400.00
43,200.00
59,000.00
33,500.00
92,166.67
83,083.33
71,875.00
58,583.33
42,200.00
41,100.00
33,350.00
43,600.00
40,400.00
37,000.00
34,000.00
27,800.00
9,500.00
4,800.00
4,860.00
NO
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
42
43
44
45
46
47
48
49
50
III.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
URAIAN
SAT.
Bh
Bh
Bh
Bh
Bh
Bh
bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
bh
bh
bh
bh
Bh
Bh
M'
Lbr
M'
Lbr
M2
M3
M'
BAHAN KAYU
Bambu
Kayu Bakar
Kayu bengkir 6/14 cm
Kayu bengkir 6/12 cm
Kayu Bengkir 5/7 cm
Kayu Bengkir 8/12 cm
Kayu Bengkir 4/6 cm
Kayu Bengkir 3/20 cm
Kayu Bengkir 10/20 cm
Kayu Papan bengkirai 2x20x400
Kayu Papan jati
Kayu Jati 8/20 cm (perum)
Kayu Jati 3/20 cm (perum)
Kayu Jati 6/14 cm (perum)
Kayu Jati 5/7 cm (perum)
Kayu Jati 2/3 cm (perum)
Kayu Jati 8/20 cm (rakyat)
Kayu Jati 3/20 cm (rakyat)
Kayu Jati 6/14 cm (rakyat)
Kayu Jati 5/7 cm (rakyat)
Kayu Jati 2/3 cm (rakyat)
Kayu Papan kempas
Kayu Kempas 8/12
Btg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
HARGA SATUAN
(Rp)
4,850.00
4,000.00
4,500.00
4,000.00
4,700.00
5,500.00
77,000.00
7,000.00
6,850.00
4,500.00
2,400.00
2,650.00
3,100.00
2,150.00
3,300.00
2,850.00
3,350.00
31,100.00
4,350.00
6,525.00
80,300.00
1,400.00
20,100.00
47,500.00
41,350.00
34,000.00
43,750.00
22,850.00
33,650.00
25,000.00
14,250.00
120,000.00
11,954,800.00
10,466,700.00
7,250,000.00
10,158,400.00
6,994,500.00
12,133,400.00
12,050,000.00
11,925,000.00
10,826,400.00
10,775,200.00
10,540,400.00
10,540,400.00
10,540,400.00
10,540,400.00
10,540,400.00
6,592,550.00
6,885,500.00
6,031,062.50
6,095,000.00
5,750,000.00
5,512,300.00
NO
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
IV.
1
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
URAIAN
Kayu Kempas 6/12
Kayu Kempas 3/20
Kayu Kempas 5/7
Kayu Kempas 4/6
Kayu Kempas 3/5
Kayu Kempas 2/3
Kayu Meranti 5/7
Kayu Meranti 4/6
Kayu Meranti 3/5
Kayu Meranti 2/3
Kayu Papan kruing
Kayu Kruing 8/12
Kayu Kruing 6/12
Kayu Kruing 3/20
Kayu Kruing 5/7
Kayu Kruing 4/6
Kayu Kruing 3/5
Kayu Kruing 2/3
Kayu Papan Cetak Pinus
Kayu Stoot ( bambu ) 5 mtr
Kayu Lokal 5/7
Kayu Lokal 4/6
Kayu Lokal 2/3
Kayu Lokal Papan
Dolken kayu lokal
Dolken Kayu 8-10/400 cm
BAHAN PENUTUP DINDING / LANTAI
Batu segi 6 tebal 10 cm abu - abu kecil
Batu segi 6 tebal 10 cm abu - abu sedang
Batu segi 6 tebal 10 cm abu - abu besar
Batu Tempel Sukabumi hijau
Batu Tempel Palimanan kuning
Batu Tempel ( Tidak Beraturan ) kecil
Batu Tempel ( Tidak Beraturan ) besar
Batu Candi 20/20, 5/20
Batu Susun sirih Andesit (Jabar) 3x30x1,3 cm
Batu Susun sirih Templek
Batu Andesit (Candi Jawa Barat) 15x30cm Bakar
Batu Andesit (Candi Jawa Barat) 15x30cm Mesin
Batu Candi 20/40
Batu Candi 15/30
Granito Uk. 40 x 40 cm
Granito Uk. 40 x 40 cm
6bh / duz
Granito Uk. 30 x 30 cm
Granito Uk. 30 x 30 cm
Granito Uk. 60 x 60 cm
Granito Uk. 60 x 60 cm
3bh / duz
Plint Granito 10 x 30 cm
Plint Granito 10 x 40 cm
Keramik 20/25, putih
Keramik 20/25, warna
Keramik 20/25, warna (bisa untuk dinding)
Keramik 20/20, anti slip ( u/.lantai Km/wc)
Keramik 20/20, anti slip ( u/.lantai Km/wc)
Keramik 20/20, warna
SAT.
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Btg
M3
M3
M3
M3
M3
Btg
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
buah
M2
buah
M2
buah
buah
buah
M2
M2
buah
M2
buah
M2
HARGA SATUAN
(Rp)
5,258,400.00
6,246,700.00
4,354,300.00
4,072,400.00
5,100,000.00
3,538,900.00
3,110,000.00
2,940,000.00
3,025,000.00
2,940,000.00
6,350,000.00
6,470,000.00
6,350,000.00
7,190,000.00
4,730,000.00
4,470,000.00
5,575,000.00
4,470,000.00
2,722,400.00
8,000.00
1,145,500.00
1,863,300.00
2,672,200.00
1,469,000.00
1,540,000.00
19,900.00
112,400.00
95,300.00
119,100.00
120,000.00
146,000.00
128,400.00
190,900.00
185,000.00
185,000.00
127,000.00
117,000.00
169,300.00
28,216.67
125,000.00
11,363.64
189,000.00
63,000.00
3,850.00
4,400.00
53,100.00
54,600.00
2,730.00
54,600.00
2,184.00
53,750.00
NO
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
V.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
17
18
19
VI.
1
2
3
4
5
6
7
8
9
10
11
12
URAIAN
Keramik 20/20, warna (bisa untuk dinding)
Keramik 10/20, warna
Keramik 10/20, warna
Keramik 30/30 (putih polos)
Keramik 30/30 (putih polos)
Keramik 30/30, warna
Keramik 40/40, (putih polos)
Keramik 40/40, (putih polos)
Keramik 40/40, warna
Keramik 40/40, Anti Slip
Keramik Uk. 5 x 20 cm Plint
Keramik Uk. 10 x 20 cm Plint
Keramik Uk. 10 x 30 cm Plint
Keramik Uk. 10 x 40 cm Plint
Keramik Anti Slip 30x30
Keramik lis Uk. 7 x 20
Keramik lis Uk. 7 x 30
Keramik lis Uk. 13 x 40
Keramik kuku macan
Wallpaper
SAT.
HARGA SATUAN
(Rp)
buah
M2
buah
M2
buah
M2
M2
buah
M2
M2
Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
M'
m2
BAHAN CETAK
Buis Beton 1/2 dia 20 cm
Buis Beton 1/2 dia 30 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Buis Beton 80 cm
Paving Block tebal 6 cm abu - abu K175 (Sekelas Muntilan)
Paving Block tebal 6 cm warna K175 (Sekelas Muntilan)
Paving Block tebal 8 cm abu - abu K175 (Sekelas Muntilan)
Paving Block tebal 8 cm warna K175 (Sekelas Muntilan)
Paving Block tebal 6 cm abu - abu lokal
Paving Block tebal 6 cm warna lokal
Rooster bata
Kansteen beton 10.20.50
Kansteen beton 8.10.25.50
Kansteen beton 8.15.30.50
Kansteen beton 8.15.30.50
Kansteen beton taman
m'
m'
m'
m'
m'
m'
m'
m'
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
m'
bh
Kg
lbr
lbr
lbr
lbr
2,150.00
55,000.00
1,100.00
48,000.00
4,400.00
51,500.00
52,200.00
8,700.00
56,200.00
59,500.00
2,750.00
5,000.00
16,000.00
13,500.00
56,600.00
4,150.00
9,000.00
10,000.00
6,000.00
64,800.00
38,000.00
45,000.00
50,000.00
66,250.00
110,000.00
115,000.00
120,000.00
130,000.00
75,000.00
85,000.00
90,000.00
98,000.00
65,000.00
68,000.00
14,000.00
15,000.00
22,500.00
#
29,500.00
25,500.00
9,100.00
9,250.00
11,500.00
9,850.00
10,000.00
18,000.00
7,920.00
8,200.00
920,000.00
1,280,000.00
1,676,000.00
2,054,000.00
NO
13
14
15
16
17
18
19
20
21
22
23
VII.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A.
URAIAN
SAT.
AIR
m'
Kg
m'
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
BERSIH
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
M'
M'
M'
M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
9,650.00
12,800.00
9,650.00
12,800.00
12,800.00
30,000.00
15,800.00
21,700.00
98,500.00
50,000.00
46,000.00
5,000.00
7,700.00
12,200.00
23,300.00
41,100.00
62,700.00
90,700.00
166,800.00
10,200.00
3,000.00
3,200.00
4,300.00
5,150.00
5,300.00
6,299.75
9,785.00
16,267.14
13,528.17
10,700.00
12,800.00
17,300.00
23,300.00
21,000.00
28,100.00
40,700.00
64,300.00
16,900.00
3,100.00
30,600.00
42,800.00
55,100.00
67,400.00
79,600.00
120,200.00
203,200.00
283,450.00
226,000.00
73,000.00
9,800.00
10,350.00
3,023.13
-
NO
1
2
3
4
5
6
7
8
B.
1
2
3
4
5
6
7
8
9
10
11
12
C.
1
2
3
4
5
6
7
8
9
D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
URAIAN
Pipa uPVC 1" ( S - 12,5 )
Pipa uPVC 1 1/2" ( S - 12,5 )
Pipa uPVC 2" ( S - 12,5 )
Pipa uPVC 3" ( S - 12,5 )
Pipa uPVC 4" ( S - 12,5 )
Pipa uPVC 6" ( S - 12,5 )
Pipa uPVC 8" ( S - 12,5 )
Pipa uPVC 10" ( S - 12,5 )
PIPA POLYETYLINE ( PE - PN. 10 - SDR 17 )
Pipa PE 1"
Pipa PE 1 1/4"
Pipa PE 1 1/2"
Pipa PE 2"
Pipa PE 2 1/2"
Pipa PE 3"
Pipa PE 4"
Pipa PE 5"
Pipa PE 6"
Pipa PE 8"
Pipa PE 9"
Pipa PE 10"
PIPA MEDIUM GALVANIZED
Pipa Medium Galvanized 1/2 "
Pipa Medium Galvanized 3/4 "
Pipa Medium Galvanized 1 "
Pipa Medium Galvanized 1 1/2 "
Pipa Medium Galvanized 2 "
Pipa Medium Galvanized 3 "
Pipa Medium Galvanized 4 "
Pipa Medium Galvanized 6 "
Pipa Medium Galvanized 8 "
ACCESSORIES PIPA
Fitting PVC DN 63 x 63 mm
Fitting PVC DN 90 x 90 mm
Fitting PVC DN 90 x 63 mm
Fitting PVC DN 110 x 110 mm
Fitting PVC DN 110 x 90 mm
Fitting PVC DN 110 x 63 mm
Fitting PVC DN 160 x 160 mm
Fitting PVC DN 160 x 110 mm
Fitting PVC DN 160 x 90 mm
Fitting PVC DN 160 x 63 mm
Fitting PVC DN 200 x 200 mm
Fitting PVC DN 200 x 160 mm
Fitting PVC DN 200 x 110 mm
Fitting PVC DN 200 x 90 mm
Fitting PVC DN 250 x 250 mm
PVC Reducer Socket RR Joint uk. DN 90 x 63 mm
PVC Reducer Socket RR Joint uk. DN 110 x 90 mm
PVC Reducer Socket RR Joint uk. DN 110 x 63 mm
PVC Reducer Socket RR Joint uk. DN 160 x 110 mm
PVC Reducer Socket RR Joint uk. DN 200 x 160 mm
PVC Reducer Socket RR Joint uk. DN 250 x 200 mm
Long Bend All Socket RR Joint 90 DN. 63 mm
Long Bend All Socket RR Joint 90 DN. 75 mm
Long Bend All Socket RR Joint 90 DN. 90 mm
SAT.
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
9,700.00
19,650.00
29,000.00
60,550.00
88,850.00
190,000.00
296,800.00
468,200.00
13,500.00
13,950.00
22,100.00
33,850.00
53,900.00
75,600.00
161,500.00
207,600.00
207,600.00
299,000.00
531,300.00
822,950.00
66,100.00
56,350.00
93,200.00
132,000.00
183,000.00
307,900.00
467,700.00
678,000.00
1,032,000.00
159,300.00
251,000.00
223,100.00
418,350.00
378,200.00
339,100.00
772,700.00
670,450.00
605,000.00
520,600.00
1,783,000.00
1,601,200.00
1,326,600.00
1,377,100.00
1,245,200.00
61,100.00
86,000.00
87,200.00
167,300.00
268,900.00
527,900.00
37,300.00
50,200.00
73,500.00
NO
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
URAIAN
Long Bend All Socket RR Joint 90 DN. 110 mm
Long Bend All Socket RR Joint 90 DN. 140 mm
Long Bend All Socket RR Joint 90 DN. 160 mm
Long Bend All Socket RR Joint 90 DN. 200 mm
Long Bend All Socket RR Joint 90 DN. 250 mm
Long Bend All Socket RR Joint 45 DN. 63 mm
Long Bend All Socket RR Joint 45 DN. 75 mm
Long Bend All Socket RR Joint 45 DN. 90 mm
Long Bend All Socket RR Joint 45 DN. 110 mm
Long Bend All Socket RR Joint 45 DN. 140 mm
Long Bend All Socket RR Joint 45 DN. 160 mm
Long Bend All Socket RR Joint 45 DN. 200 mm
Long Bend All Socket RR Joint 45 DN. 250 mm
Long Bend All Socket RR Joint 22,5 DN. 63 mm
Long Bend All Socket RR Joint 22,5 DN. 75 mm
Long Bend All Socket RR Joint 22,5 DN. 90 mm
Long Bend All Socket RR Joint 22,5 DN. 110 mm
Long Bend All Socket RR Joint 22,5 DN. 140 mm
Long Bend All Socket RR Joint 22,5 DN. 160 mm
Long Bend All Socket RR Joint 22,5 DN. 200 mm
Long Bend All Socket RR Joint 22,5 DN. 250 mm
Flanges Socket RR Joint DN. 63 mm
Flanges Socket RR Joint DN. 90 mm
Flanges Socket RR Joint DN. 110 mm
Flanges Socket RR Joint DN. 160 mm
Flanges Socket RR Joint DN. 200 mm
Flanges Socket RR Joint DN. 250 mm
CI Gte Valve Flanged Flat Body "AFT" 40 mm
CI Gte Valve Flanged Flat Body "AFT" 50 mm
CI Gte Valve Flanged Flat Body "AFT" 80 mm
CI Gte Valve Flanged Flat Body "AFT" 100 mm
CI Gte Valve Flanged Flat Body "AFT" 150 mm
CI Gte Valve Flanged Flat Body "AFT" 200 mm
CI Gte Valve Flanged Flat Body "AFT" 250 mm
Giboult Joint Cast Iron PN. 10 uk. 50 mm
Giboult Joint Cast Iron PN. 10 uk. 80 mm
Giboult Joint Cast Iron PN. 10 uk. 100 mm
Giboult Joint Cast Iron PN. 10 uk. 150 mm
Giboult Joint Cast Iron PN. 10 uk. 200 mm
Giboult Joint Cast Iron PN. 10 uk. 250 mm
Tangki air (Hidran Umum) uk. 1000 ltr
Tangki air (Hidran Umum) uk. 2000 ltr
Tangki air (Hidr Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
SAT.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
138,200.00
213,800.00
320,200.00
650,900.00
1,182,400.00
38,200.00
42,500.00
64,200.00
102,900.00
169,750.00
276,900.00
459,100.00
851,500.00
28,600.00
37,300.00
55,500.00
87,500.00
140,500.00
235,600.00
391,500.00
686,000.00
113,100.00
156,100.00
195,200.00
329,100.00
516,100.00
803,100.00
989,500.00
1,095,800.00
1,593,900.00
2,125,200.00
3,453,450.00
5,512,200.00
8,301,500.00
237,000.00
285,500.00
342,600.00
541,900.00
670,700.00
890,900.00
3,187,800.00
6,508,425.00
7,438,200.00
317,500.00
454,700.00
526,900.00
541,300.00
577,500.00
815,600.00
830,100.00
858,900.00
945,700.00
1,219,900.00
1,248,800.00
1,321,000.00
1,443,800.00
NO
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
URAIAN
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend 45 uk. 250 mm
All Flange Reducer uk. 80 x 50 mm
All Flange Reducer uk. 100 x 50 mm
All Flange Reducer uk. 100 x 80 mm
All Flange Reducer uk. 150 x 80 mm
All Flange Reducer uk. 150 x 100 mm
All Flange Reducer uk. 200 x 75 mm
All Flange Reducer uk. 200 x 100 mm
All Flange Reducer uk. 200 x 150 mm
All Flange Reducer uk. 250 x 75 mm
All Flange Reducer uk. 250 x 100 mm
All Flange Reducer uk. 250 x 150 mm
All Flange Reducer uk. 250 x 200 mm
Wall Pipe uk. 100 x 0.50 mm
Wall Pipe uk. 150 x 0.50 mm
Wall Pipe uk. 200 x 0.50 mm
Wall Pipe uk. 250 x 0.50 mm
Giboult Joint uk. 50 mm
Giboult Joint uk. 75 mm
Giboult Joint uk. 100 mm
Giboult Joint uk. 150 mm
Giboult Joint uk. 200 mm
Giboult Joint uk. 250 mm
Bend All Socket 90 uk. 50 mm
Bend All Socket 90 uk. 100 mm
Bend All Socket 90 uk. 150 mm
Bend All Socket 90 uk. 200 mm
Bend All Socket 90 uk. 250 mm
Air Relief Valve ( CI ) DN 50 mm
Air Relief Valve ( CI ) DN 80 mm
Air Relief Valve ( CI ) DN 100 mm
Air Relief Valve ( CI ) DN 150 mm
Air Relief Valve ( CI ) DN 200 mm
VIII. B A H A N L A N G I T - L A N G I T
1 Asbes Plat tebal 6 mm (1,00 x 1,00)
2 Bilik bambu
3 Eternit 1 x 1 m2 t = 4 mm Djabesmen / harflex
4 Eternit (saflex) 1 x 1 m2, t = 5 mm
5 Gypsum uk. 1,2 x 2,4 tebal 9mm
6 Akustik (60x120)
7 Lis gypsum
8 Lis kayu profil
9 Lis kayu 2/4
10 Teakwood 0,9 x 2,1 t = 3 mm
SAT.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
M2
m2
m2
Lbr
Lbr
m'
M'
M'
Lbr
HARGA SATUAN
(Rp)
216,500.00
317,500.00
404,000.00
721,900.00
996,100.00
1,443,800.00
223,800.00
332,000.00
404,100.00
692,900.00
1,025,000.00
1,530,100.00
252,650.00
274,200.00
288,750.00
498,000.00
526,900.00
613,600.00
649,600.00
685,700.00
887,900.00
901,800.00
938,400.00
1,032,300.00
822,900.00
1,155,000.00
1,790,200.00
2,324,400.00
180,500.00
274,200.00
345,200.00
541,300.00
810,800.00
1,176,600.00
454,700.00
456,600.00
721,900.00
1,624,100.00
2,526,500.00
1,713,400.00
1,177,900.00
4,316,800.00
8,633,600.00
13,402,000.00
18,500.00
49,000.00
17,000.00
15,300.00
57,900.00
146,080.00
19,400.00
7,900.00
4,600.00
154,000.00
NO
11
11
11
12
13
14
15
16
17
18
URAIAN
SAT.
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
IX.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
BAHAN FINISHING
Amplas
Coating Heritage alami
Dempul kayu
Plamur Kayu
Plamur tembok
Cat Besi
Cat Kayu
Cat Tembok
Cat Tembok (setara Catylac)
Cat Tembok exterior
Flinkote
Kuas 3"
Kuas 2"
Lem kayu
Lem Kuning
Lem Putih
Lem Vinyl
Lem Perekat Wallpaper
Oker Putih
Oker Warna
Melamik
Menie Besi
Menie kayu
Minyak Cat
Politur
Politur Jadi
Residu
Rol Cat
Sirlak
Spiritus
Teer
Sirlak
Spiritus
Teer
Teak oil
Vernis
Vernis Batu alam
Lbr
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Kg
Kg
Ltr
Ltr
Kg
Ltr
Bh
Ltr
Kg
Bh
Ltr
Kg
Bh
Kg
Ltr
Ltr
X.
BAHAN KACA
Kaca patri
Kaca bening 5 mm
Kaca ryban 5 mm
Kaca Es
Kaca Bening 12 mm
M2
M2
M2
M2
M2
1
2
3
4
4
HARGA SATUAN
(Rp)
159,500.00
84,700.00
64,000.00
78,000.00
107,800.00
59,200.00
46,100.00
4,400.00
42,900.00
35,000.00
20,000.00
21,600.00
50,000.00
50,700.00
16,500.00
23,400.00
29,300.00
31,000.00
8,900.00
5,200.00
16,000.00
23,000.00
14,200.00
12,000.00
23,000.00
8,500.00
9,000.00
60,000.00
24,100.00
22,600.00
19,100.00
42,000.00
45,600.00
34,200.00
18,500.00
58,400.00
21,700.00
29,000.00
58,400.00
21,700.00
29,000.00
23,500.00
28,800.00
51,100.00
300,000.00
96,000.00
91,400.00
80,000.00
306,300.00
NO
5
6
6
7
8
9
10
11
14
XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
URAIAN
SAT.
Kaca Buram 12 mm
Kaca Cermin tebal 5mm
Kaca nako
Kaca one way
Kaca tebal 3 mm
Kaca tebal 8 mm
Kaca, cermin tebal 8 mm
Kaca cermin, tebal 6 mm
Kaca Wireglass
Profil Kaca
M2
M2
M2
M2
M2
M2
M2
M2
M2
M'
Set
Set
Set
Set
Set
Mtr
Bh
Set
Set
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
298,000.00
158,800.00
490,100.00
60,000.00
3,000.00
30,200.00
45,400.00
60,500.00
80,800.00
121,250.00
5,900.00
26,400.00
55,050.00
16,900.00
3,700.00
87,550.00
88,200.00
88,200.00
102,050.00
103,300.00
2,100.00
16,650.00
16,650.00
16,000.00
21,100.00
16,900.00
14,420.00
19,050.00
17,600.00
4,000.00
26,900.00
27,800.00
30,200.00
26,500.00
36,900.00
27,600.00
28,700.00
26,600.00
25,600.00
22,500.00
27,150.00
29,200.00
31,200.00
40,400.00
21,950.00
26,400.00
82,430.00
42,850.00
NO
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
URAIAN
Bracket Secondary / Bracket Insulated
Brecket transformer
Bracket Extension For cut out
Bracket band segment vertical plat(Hot dip galvanis
Center Bracket 6 KN
Center Bracket 12,5 KN
Caterpain
Clamp bougel
Clamp ground rod
Clamp ground wire
Clamp hot line top assembly
Clamp Hot line ( 35 mm2 s/d 70 mm2)
Clamp Hot line ( 150 mm2 s/d 240 mm2)
Clamp Loop Dead End / LC ( 35 s/d 240 ) mm2
Clevis Swinging Secondary
Compression Connector H Type 150 mm2 / 240 mm2
Compression Connector H Type 240 mm2 / 240 mm2
Compression Connector H Type 50 mm2 / 70 mm2
Compression Connector H Type 70 mm2 / 150 mm2
Compression Connector H Type 70 mm2 / 70 mm2
Compression Terminal Lug 35 mm2
Compression Terminal Lug 50 mm2
Compression Terminal Lug 70 mm2
Compression Terminal Lug 150 mm2
Compression Terminal Lug 240 mm2
Cross Arm Steel 1.500 mm (UNSP 10) galvanis
Cross Arm Steel 2000 mm (UNSP 10) galvanis
Cross Arm Steel 3000 mm (UNSP 10) galvanis
Dead End Assembly ( CJ6-T)
Distribusi trafo CSP 50 KVA
Distribusi trafo CSP 25 KVA
Distribusi trafo CST 105 / CG 1 Phase 50 KVA
Distribusi trafo CST 106 / CG 3 Phase 50 KVA
Distribusi trafo CST 106 / CG 3 Phase 100 KVA
Distribusi trafo CST 106 / CG 3 Phase 160 KVA
Freeformed Guy Wire 22 mm2
Freeformed Guy Wire 35 mm2
Freeformed Guy Wire 70 mm2
Fuse Cut Out 20 KV, 100A
Fuse Link 3A
Fuse Link 6A
Fuse Link 8A
Fuse Link 10A
Fuse Link 15A
Fuse Link 20A
Fuse Link 25A
Fuse Link 30A
Fuse Link 50A
Fuse Link 60A
Fuse Link 65A
Fuse Link 80A
Fuse Link 100A
NT Fuse 63 - 100 A lengkap size 0
NT Fuse 63 - 100 A lengkap size 1
NT Fuse 63 - 100 A lengkap size 2
NT Fuse 63 - 100 A lengkap size 3
SAT.
HARGA SATUAN
(Rp)
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
18,540.00
334,750.00
60,500.00
368,760.00
67,300.00
79,900.00
3,200.00
13,150.00
13,900.00
13,900.00
149,350.00
64,600.00
110,200.00
25,770.00
19,050.00
40,000.00
43,280.00
24,720.00
37,000.00
28,600.00
36,050.00
10,600.00
13,300.00
25,400.00
31,800.00
269,600.00
359,500.00
539,400.00
73,140.00
33,359,700.00
31,953,100.00
27,912,500.00
36,540,000.00
44,152,500.00
68,005,000.00
27,600.00
32,800.00
38,200.00
1,133,000.00
36,900.00
36,900.00
36,900.00
36,900.00
36,900.00
47,100.00
47,100.00
47,100.00
60,500.00
60,500.00
60,500.00
60,500.00
50,400.00
74,000.00
94,300.00
114,400.00
148,200.00
NO
URAIAN
SAT.
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Bh
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
12,800.00
7,000.00
8,450.00
12,400.00
22,500.00
73,500.00
23,200.00
36,900.00
67,300.00
1,138,400.00
11,300.00
119,800.00
23,300.00
215,000.00
28,100.00
215,600.00
215,600.00
245,200.00
377,400.00
26,950.00
31,900.00
33,700.00
96,900.00
118,600.00
4,000.00
106,200.00
9,900.00
191,900.00
9,800.00
15,000.00
20,950.00
11,100.00
22,800.00
16,750.00
18,000.00
19,096.00
23,300.00
31,000.00
2,060.00
26,200.00
27,470.00
28,900.00
30,200.00
45,700.00
51,550.00
36,900.00
30,200.00
32,200.00
34,300.00
36,300.00
50,600.00
56,200.00
44,400.00
24,200.00
25,500.00
26,900.00
NO
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
URAIAN
Pole band Single rack 6" atau 6 1/2"
Pole band Single rack 7" atau 7 1/2"
Pole band Single rack 8" atau 8 1/2"
Pole band Single rack 9" s/d 12"
Pole Band Single rack 10"
Pole band Single Up Side 3" atau 3 1/2"
Pole band Single Up Side 4" atau 4 1/2"
Pole band Single Up Side 5" atau 5 1/2"
Pole band Single Up Side 6" atau 6 1/2"
Pole band Single Up Side 7" atau 7 1/2"
Pole band Single Up Side 8" atau 8 1/2"
Pole band Single Up Side 9" s/d 12"
Primary Angle Clamp ( 35 s/d 70) mm2
Primary Angle Clamp ( 150 s/d 240 ) mm2
Primary Dead End Clamp ( 35 s/d 70) mm2
Primary Dead End ( 150 s/d 240 ) mm2
Shackle Anchor 5/8"
Side Bracket
Split bolt connector
Split plastic sleeve
Spol Insulator ANSI 53-2
Spol Insulator ANSI 53-4
Stainless Steel Strap 20 x 0,7 mm
Stainless Steel Strap
Strap for clamping
Steel L 70 x 70 x 7 x 1.000 mm galvanis
Steel L 70 x 70 x 7 x 1.262 mm galvanis
Steel L 70 x 70 x 7 x 780 mm galvanis
Stopping Buckle / Yokes
Suspension / Small Angle Assembly ( CJ5-T)
Tap Connector ( 35s/d 70) mm2
Tap Connector ( 35s/d 150) mm2
Tap Connector ( 70 s/d 150 ) mm2
Tap Connector ( 70 s/d 240 ) mm2
Three Bolt Clamp
Tie Wire # 4 / Alluminium Bonding Wire # 20
Washer Square 2 1/4"
Washer Square 2 1/2"
Washer Round 3/8"
Penghalang panjat
Papan tanda bah
5 Watt
Lampu TL
10 Watt
Lampu TL
15 Watt
Lampu TL
18 Watt
Lampu TL
20 Watt
Lampu TL
36 Watt
Lampu TL
40 Watt
ML
100 Watt
ML
160 Watt
ML
250 Watt
ML
250 Watt
SON
70 Watt
SON
150 Watt
SON
250 Watt
SON
400 Watt
BALAST / TRAFO
SAT.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
28,200.00
29,500.00
30,900.00
35,000.00
45,500.00
28,200.00
30,200.00
32,200.00
34,300.00
47,300.00
52,400.00
42,300.00
56,650.00
60,500.00
67,300.00
94,300.00
18,000.00
69,300.00
23,100.00
2,100.00
36,050.00
41,200.00
10,900.00
2,800.00
2,650.00
20,600.00
215,200.00
107,200.00
2,100.00
33,100.00
5,200.00
13,600.00
18,300.00
23,200.00
38,100.00
6,600.00
3,200.00
3,200.00
1,500.00
88,100.00
17,600.00
12,100.00
16,100.00
18,700.00
22,800.00
24,100.00
26,900.00
6,600.00
202,100.00
188,600.00
336,500.00
417,700.00
269,500.00
363,800.00
43,300.00
296,500.00
NO
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
HPL
HPL
HPL
HPL
HPL
HPL
Contactor
Contactor
Contactor
Ignitor SN 58
Kapasitor
MCB
URAIAN
SAT.
HARGA SATUAN
(Rp)
50
70
80
125
250
400
25
35
16
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Pak
Bh
Bh
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
269,500.00
269,500.00
283,000.00
296,500.00
350,400.00
148,200.00
229,000.00
229,000.00
6,600.00
134,700.00
113,500.00
67,300.00
80,800.00
309,900.00
1,078,200.00
1,347,800.00
1,887,000.00
2,021,800.00
2,695,700.00
4,043,600.00
5,661,000.00
8,761,100.00
9,435,100.00
12,804,700.00
20,150.00
107,800.00
1,900.00
67,300.00
47,100.00
40,400.00
20,150.00
18,700.00
4,000.00
16,100.00
13,400.00
13,400.00
8,600.00
4,550.00
9,300.00
20,100.00
9,300.00
14,700.00
16,100.00
21,500.00
26,900.00
53,800.00
14,700.00
53,800.00
2,650.00
10,700.00
20,150.00
202,000.00
242,500.00
3,369,600.00
5,391,400.00
watt
watt
watt
watt
watt
watt
Ampere
Ampere
Ampere
6-16 Ampere
17-35 Ampere
Lebih dari 63 Ampere
Megnetic Switch
10 Ampere
20 Ampere
29 Ampere
35 Ampere
50 Ampere
65 Ampere
95 Ampere
125 Ampere
150 Ampere
220 Ampere
Stop kontak
outbow
outbow
In bow
In bow
In bow
In bow
Saklar Engkel
outbow
In bow
Staker
Biasa / tanopa arde
dengan arde
Klem U
Klem Kabel
Fitting
Plafon
Gantung
NYM Uk.
2x2,5 mm
NYM Uk.
2 x 4 mm
NYM Uk.
4 x 4 mm
NYY Uk.
3x2,5 mm
NYY Uk.
2x4 mm
NYY Uk.
3x4 mm
NYY Uk.
4x4 mm
NYY Uk.
4x6 mm
DX / Twisted
LVTC 2x70 +N.50
LVTC 2x35 +N.50
Isolasi keci
Isolasi besar
Test pen
Fotosel ( otomat )
Modul Lampu amar
Modul Traffic Light
Tangga Aluminium Lipat P 8 meter
NO
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
URAIAN
Klem Pole Band
Pal Bantu RS 9
Konsol panjang 6 meter 2 " tebal 3 mm Medium A
Konsol panjang 6 meter 2 " tebal 2 mm Medium A
Pool Massa
Kap lampu Son 250 Watt Lengkap
Kap lampu Son 250 Watt Type SMR 511
Kap lampu TL isi 2
Kap Lampu Caping LHE
Sekering
Fiting SON
T Doos
Stop kontak AC
Contak cleaner
Jek AC
Pal bantu berornamen
Tambang plastik besar
Sayang bambu komplit
Martil / palu 5 Kg
Bor listrik
Mata bor
Digger Tanah
Pemasangan Jaringan Listrik
KWH Meter 1 phasa 220 v, 5 / 20 A, s1 F,5/20A,ST
KWH Meter 1 Phasa 220 v, 20/60A, s 1 F,20/60A,ST
KWH Meter 1 Phasa 220 v, 50/100 A, 1 F,50/100A,ST
KWH Meter 3 Phasa 220/380 v,5/20 A3 F,5/20A,ST
KWH Meter 3 Phasa 220/380 v,20/60 3 F,20/60A,ST
KWH Meter 3 Phasa 220/380 v,50/1003 F,50/100A,ST
KWH Meter 3 Phasa 220/380 v,5/20 A3 F,5/20A,DT
KWH Meter 3 Phasa 220/380 v,20/60 3 F,20//60A,DT
KWH Meter 3 Phasa 220/380 v,50/10 3 F,50/100A,DT
KVARH Meter 3 Ph 220/380 v,5/20 A, 3 F,5/20A,DT
KVARH Meter 3 Ph 220/380 v,20/60 A3 F,20/60A,ST
KVARH Meter 3 Ph 220/380 v,50/100 3 F,50/100A,ST
KWH Meter 3 Phasa 57, 7/100 v, /5A, 3 F,/5 A,ST
KWH Meter 3 Phasa 57, 7/100 v, /5A, 3 F, /5 A,DT
KOTAK APP
Kotak APP Type Lipat, lengkap
Type I Lipat
Kotak APP Type III Lipat, lengkap
Type III
Kotak APP TR Type IV Tanpa Topi, le Type IV
Kotak APP TR Type I A Single tarif le Type I
Kotak APP TR Double Tarif, lengkap Double tarif
Kotak APP TM, lengkap
TM
TRANSFORMATOR
Trafo 1 Phasa CSP 12,7 KV/B2
50 KVA
Trafo 3 Phasa 20 KV/B2
50 KVA
Trafo 3 Phasa 20 KV/B2
100 KVA
Trafo 3 Phasa 20 KV/B2
160 KVA
Trafo 3 Phasa 20 KV/B2
200 KVA
Trafo 3 Phasa 20 KV/B2
250 KVA
Trafo 3 Phasa 20 KV/B2
315 KVA
Trafo 3 Phasa 20 KV/B3
400 KVA
Trafo 3 Phasa 20 KV/B2
630 KVA
KONDUKTOR
SAT.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m'
Set
Bh
Bh
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
175,150.00
2,021,800.00
673,900.00
606,500.00
121,250.00
3,774,000.00
1,010,900.00
606,500.00
1,077,000.00
33,600.00
53,800.00
6,600.00
80,800.00
33,600.00
26,900.00
5,484,100.00
3,800.00
127,900.00
33,600.00
1,213,000.00
269,500.00
202,100.00
204,200.00
166,300.00
297,700.00
1,199,550.00
1,266,700.00
1,347,300.00
1,546,800.00
1,616,800.00
1,751,500.00
1,198,800.00
1,266,700.00
1,347,300.00
1,226,400.00
1,549,900.00
50,300.00
235,800.00
4,717,550.00
5,822,700.00
6,038,400.00
5,607,000.00
39,232,100.00
45,765,200.00
60,690,000.00
83,391,100.00
89,733,300.00
105,051,800.00
100,458,800.00
119,568,700.00
171,793,800.00
-
NO
###
###
###
###
###
###
###
###
###
###
###
URAIAN
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
AAAC 25 mm2
25 mm2
AAAC 35 mm2
35 mm2
AAAC 50 mm2
50 mm2
AAAC 70 mm2
70 mm2
AAAC 150 mm2
150 mm2
AAAC 240 mm2
240 mm2
AAAC/S 150 mm2
150 mm2
AAAC/S 240 mm2
240 mm2
ACSR 70 mm2
70 mm2
ACSR 150 mm2
150 mm2
ACSR 240 mm2
240 mm2
KABEL TM/TR
NFA2X-T 2 x 35 + N 50 mm2
2x35+N50mm2
NFA2X-T 2 x 70 + N 50 mm2
2x70+N50mm2
NFA2X-T 3 x 70 + N 50 mm2
3x70+N50mm2
NFA2X 2 x 10 mm2
2x10 mm2
NFA2X 2 x 16 mm2
2x16 mm2
NFA2X 2 x 25 mm2
2x25 mm2
NFA2X 4 x 10 mm2
4x10 mm2
NFA2X 4 x 16 mm2
4x16 mm2
NFA2X 4 x 25 mm2
4x25 mm2
Kabel NYFGBY 4 x 4 mm2
4x4 mm2
Kabel NYFGBY 4 x 50 mm2 CU
4x50 mm2
Kabel NYFGBY 4 x 95 mm2 CU
4x95 mm2
Kabel NYFGBY 4 x 150 mm2 CU
4x150 mm2
Kabel NYY 1X 150 mm2
1x150 mm2
Kabel NA2XSEFGbY 20 KV, 3 X 150 3x150 mm2
Kabel NA2XSY 20 KV, 1 X 240 mm2 1x240 mm2
Kabel NA2XSEYBY 20 KV, 3 X 240 m 3x240 mm2
Kabel NA2XSY 20 KV, 1 X 150 mm2 1x120 mm2
Kabel NA2XSEYBY 20 KV, 3 X 300 m 3x300 mm2
Kabel NA2XSY 20 KV, 1 X 70 mm2 1x95 mm2
Kabel NA2XSEYBY 20 KV, 3 X 95 mm 3x95 mm2
Kabel NA2XS2Y 20 KV, 1 X 150 mm2 1x150 mm2
Kabel NA2XS2Y 20 KV, 1 X 240 mm2 1x240 mm2
Kabel NA2XS2Y 20 KV, 1 X 300 mm2 1x300 mm2
Kabel NFA2XSY-T-3 X 240+50 mm2,2 3x240 mm2
Kabel NYA Fleksibel 2,5 mm2
2,5 mm2
Kabel NYA Fleksibel 4 mm2
4 mm2
Kabel NYA Fleksibel 6 mm2
6 mm2
Kabel NYA Fleksibel 10 mm2
10 mm2
Kabel NYA Fleksibel 16 mm2
16 mm2
Kabel LVTC Ukuran 3 x 35 + N.25
Kabel LVTC Ukuran 3 x 70 + N.25
###
###
###
###
###
###
###
###
###
###
SEPATU KABEL
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Ring
Ring
Ring
Ring
Ring
Ring
Ring
Kepala
Kepala
Kepala
SAT.
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
50
70
95
120
150
185
240
50
70
95
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
22,000.00
27,500.00
38,500.00
49,500.00
82,500.00
93,500.00
88,000.00
110,000.00
14,850.00
31,700.00
51,900.00
23,100.00
35,600.00
45,900.00
4,300.00
6,900.00
9,100.00
9,500.00
13,600.00
18,450.00
37,000.00
271,600.00
514,950.00
798,500.00
167,100.00
367,000.00
122,100.00
421,700.00
100,700.00
487,400.00
71,610.00
259,390.00
100,700.00
122,000.00
135,500.00
334,800.00
2,400.00
5,400.00
7,950.00
12,730.00
13,050.00
27,400.00
39,100.00
64,600.00
68,200.00
71,700.00
81,900.00
87,700.00
111,200.00
128,300.00
48,400.00
52,500.00
55,050.00
NO
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
URAIAN
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
TIANG BETON
C 7M-100 daN+E
7M-100 daN+E
C 9M-100 daN+E
9M-100 daN+E
C 9M-200 daN+E
9M-200 daN+E
C 11M-200 daN+E
11M-200 daN+E
C 11M-350 daN+E
11M-350 daN+E
C 12M-200 daN+E
12M-200 daN+E
C 12M-350 daN+E
12M-350 daN+E
C 12M-500 daN+E
12M-500 daN+E
C 13M-350 daN+E
13M-350 daN+E
C 13M-500 daN+E
13M-500 daN+E
C 14M-350 daN+E
14M-350 daN+E
C 14M-500 daN+E
14M-500 daN+E
ABSW
Load Break switch 20 KV-630A
20 KV, 630 A
Load Break switch 20 KV-630A (Moto 20 KV, 630 A
6 lengkap dengan kontrol
D.S
Disconnecting Switch 20 KV-630 A 20 KV, 630 A
ARESTER
Lightning Arester 20 KV, 5 KA
20 KV, 5 KA.
Lightning Arester 20 KV, 10 KA
20 KV, 10 KA
CAPACITOR POLE MOUNTED
Micro Cap Controller
Current Sensor
ACCESSORIES APP
Kawat Segel
Timah segel
Service wedge Clamp 616
Service wedge Clamp 625
PEKERJAAN KABEL TANAH
Terminating kabel 3 x 300 mm2 ID 3 x 300 mm2
Terminating kabel 1 x 300 mm2 ID 1 x 300 mm2
Terminating kabel 3 x 300 mm2 OD 3 x 300 mm2
Terminating kabel 1 x 300 mm2 OD 1 x 300 mm2
Terminating kabel 3 X 240 mm2 ID 3 x 240 mm2
Terminating kabel 1 x 240 mm2 ID 1 x 240 mm2
Terminating kabel 3 x 240 mm2 OD 3 x 240 mm2
Terminating kabel 1 x 240 mm2 OD 1 x 240 mm2
SAT.
120
150
185
240
35
50
70
95
120
150
240
35
50
70
95
150
240
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Set
Set
Set
Bh
Bh
Bh
Bh
Roll
Kg
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
HARGA SATUAN
(Rp)
57,900.00
66,400.00
81,150.00
85,000.00
9,200.00
9,800.00
9,800.00
11,550.00
14,500.00
19,800.00
26,200.00
21,100.00
23,800.00
30,650.00
38,000.00
61,200.00
107,150.00
1,703,600.00
2,226,840.00
2,585,000.00
3,740,000.00
4,345,000.00
4,294,290.00
4,688,100.00
5,450,400.00
5,712,630.00
6,093,780.00
6,455,200.00
7,133,280.00
23,586,900.00
172,527,800.00
10,108,250.00
724,300.00
826,200.00
24,814,450.00
17,717,900.00
80,800.00
60,400.00
3,600.00
4,900.00
4,177,800.00
2,559,950.00
4,986,230.00
2,897,300.00
3,778,925.00
3,371,540.00
5,379,800.00
3,805,400.00
NO
###
###
###
###
###
###
###
###
###
###
###
URAIAN
Terminating kabel 3 x 95 mm2 ID
Terminating kabel 1 x 95 mm2 ID
Terminating kabel 3 x 95 mm2 OD
Terminating kabel 1 x 95 mm2 OD
Jointing Raychem 24 kV 3 x 300 mm
Jointing Raychem 24 kV x 300 mm2
Jointing Raychem 24 kV 3 x 240 mm
Jointing Raychem 24 kV 1 x 240 mm
Jointing Raychem 24 kV 3 x 95 mm2
Jointing Raychem 24 kV 1 x 95 mm2
Klem beugel bevesteging 8 x 6"
3
1
3
1
3
3
3
3
3
3
8
x
x
x
x
x
x
x
x
x
x
x
SAT.
95 mm2
95 mm2
95 mm2
95 mm2
300 mm2
1 x 300 mm2
240 mm2
1 x 240 mm2
95 mm2
1 x 95 mm2
6"
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh
XII.
1
2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Psg
Psg
Psg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
XIII.
1
2
3
3
4
5
6
6
7
8
9
10
11
12
13
14
15
BAHAN
SANITAIR
Bak cuci stainless steel Royal
Bak cuci stainless steel Viega ( 1.00 x 0.90 ) m2
Bak cuci stainless steel 80 cm
Bak fiberglass vol 30 ltr
Bak mandi fiber glass, vol 120 ltr sudut
Bak mandi fiber glass, vol 120 ltr kotak
Bak mandi fiber glass, vol 150 ltr
Bak mandi fiber glass, vol 1000 ltr
Bak Tandon air fiber isi 500 Ltr
Bak Tandon air fiber isi 1000 Ltr
Floor Drain / Saringan pembuang pada lantai KM/WC
Kloset duduk / Monoblok "INA", Putih
Kloset duduk / Monoblok "INA", Warna Tua
Kloset duduk / Monoblok + pembilas otomatis "INA"
Kloset duduk Colour
Kloset Jongkok INA warna tua
Kloset Jongkok INA warna muda
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
HARGA SATUAN
(Rp)
2,844,200.00
240,175.00
4,177,800.00
3,182,700.00
4,295,200.00
4,447,200.00
473,950.00
4,380,450.00
4,380,450.00
3,705,700.00
30,230.00
195,000.00
116,900.00
80,300.00
16,900.00
7,000.00
9,500.00
15,000.00
18,500.00
10,900.00
19,400.00
7,100.00
5,300.00
9,250.00
7,400.00
11,750.00
6,500.00
5,500.00
53,000.00
79,000.00
33,900.00
25,800.00
72,600.00
55,600.00
180,600.00
154,300.00
128,600.00
228,900.00
234,000.00
260,000.00
856,900.00
1,201,900.00
16,600.00
373,700.00
300,000.00
1,183,750.00
254,000.00
142,200.00
137,200.00
NO
16
17
18
19
20
21
21
22
23
24
25
26
URAIAN
SAT.
Bh
Bh
bh
Bh
Bh
Bh
Set
Bh
Bh
Bh
Bh
Bh
XIV.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Kg
Bh
Kg
Bh
Kg
Kg
Bh
Kg
Bh
Bh
Kg
Kg
Kg
Kg
XV.
1
2
3
4
5
5
6
7
8
9
10
11
12
12
13
14
15
16
17
18
19
20
20
21
22
23
LAIN - LAIN
Anti Rayap
Air
Aspal curah
Aspal Drum
Alat Bantu
Daun Naco
Elastomer strip uk. 30 x 30
Elastomer strip uk. 20 x 20
Gebalan rumput
Geotextile
Ijuk
Karpet
Karet dan epoxy mortar
Karpet
Minyak Bekisting
Minyak flux
Minyak pelumas
Minyak Tanah
Minyak Bakar
Minyak solar
Minyak solar industri
Minyak bensin
Minyak bensin industri
Sealent
Soda api
Sabun
Ltr
Ltr
Kg
Kg
Set
Bh
Bh
Bh
M2
M2
Kg
M2
Kg
M2
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Tube
Kg
Kg
HARGA SATUAN
(Rp)
18,600.00
18,900.00
65,000.00
87,400.00
29,800.00
350,000.00
225,000.00
62,300.00
27,000.00
217,500.00
220,000.00
20,000.00
15,000.00
18,800.00
300.00
21,000.00
24,900.00
1,000.00
19,000.00
1,550.00
1,200.00
22,600.00
20,150.00
20,000.00
41,200.00
26,150.00
100.00
7,631.33
9,155.27
50,000.00
1,180,000.00
850,000.00
30,000.00
23,000.00
40,000.00
15,200.00
26,900.00
20,000.00
20,000.00
17,000.00
30,000.00
9,650.00
6,500.00
6,000.00
9,200.00
6,700.00
13,500.00
16,000.00
9,500.00
NO
URAIAN
CATATAN :
- Harga belum termasuk keuntungan
pemborong dan PPN10%
SAT.
HARGA SATUAN
(Rp)
Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya
SUKAHAR, ST, MT
NIP 19601103 198103 1 006
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
URAIAN
Pekerja
Tukang gali
Mandor
Tukang cat/ plitur / batu
Kepala tukang cat/ plitur / batu
Tukang kayu
Kepala tukang kayu
Tukang Besi / ledeng
Kepala Tukang besi / ledeng
Tukang Besi Profil
Kepala Tukang besi Profil
Mekanik
Mekanik Pembantu
Operator terlatih/ masinis
Operator kurang terlatih
Pembantu operator/ pemb. masinis
Sopir truk
Sopir personil
Pembantu sopir
Buruh lapangan tak terlatih
Buruh lapangan semi terlatih
Buruh lapangan terlatih
Tukang masak aspal
Penjaga malam
SATUAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
HARGA ( Rp )
50,000.00
70,000.00
75,000.00
70,000.00
75,000.00
70,000.00
75,000.00
70,000.00
75,000.00
70,000.00
75,000.00
65,000.00
55,000.00
65,000.00
60,000.00
45,000.00
60,000.00
50,000.00
50,000.00
45,000.00
50,000.00
60,000.00
65,000.00
40,000.00
Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya
SUKAHAR, ST, MT
NIP 19601103 198103 1 006
KEGIATAN
PEKERJAAN
LOKASI
TA
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
PEKERJAAN PERSIAPAN
A.2.2.1.2. Pembuatan 1 m2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kayu Dolken diameter 8 - 10 /
400
cmPortland
Semen
Seng Gelombang
Pasir Beton
Koral Beton
Kayu 5/7
Paku Biasa 2" - 5"
Meni Besi
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.200
50,000.00
0.400
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
10,000.00
28,000.00
1,500.00
1,500.00
41,000.00
Btg
Kg
Lbr
m3
m3
m3
Kg
Kg
1.250
19,900.00
2.500
1,500.00
1.200
47,500.00
0.005
174,500.00
0.009
170,588.47
0.072
1,145,500.00
0.060
18,800.00
0.450
24,100.00
JUMLAH HARGA BAHAN
24,875.00
3,750.00
57,000.00
872.50
1,535.30
82,476.00
1,128.00
10,845.00
182,481.80
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
223,481.80
33,522.27
257,004.07
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Dolken diameter 8 - 10 /
400
cmPortland
Semen
Seng Gelombang
Pasir Beton
Koral Beton
Kayu Lokal 5/7
Paku Biasa 2" - 5"
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.200
50,000.00
0.400
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
10,000.00
28,000.00
1,500.00
1,500.00
41,000.00
Btg
Kg
Lbr
m3
m3
m3
Kg
1.250
19,900.00
2.500
1,500.00
1.200
47,500.00
0.005
174,500.00
0.009
170,588.47
0.014
1,145,500.00
0.060
18,800.00
JUMLAH HARGA BAHAN
24,875.00
3,750.00
57,000.00
872.50
1,535.30
16,317.65
1,128.00
105,478.44
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
146,478.44
21,971.77
168,450.21
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Bambu diameter 6 - 8 / 600 cm
Tali Ijuk
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.170
50,000.00
0.250
70,000.00
0.002
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
8,500.00
17,500.00
150.00
97.50
26,247.50
Btg
Kg
1.250
14,250.00
0.186
40,000.00
JUMLAH HARGA BAHAN
17,812.50
7,440.00
25,252.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
51,500.00
7,725.00
59,225.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
D
E
F
Kode
L.01
L.04
Satua Koefisie
n
n
OH
OH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga
Satuan
(Rp)
6.667
50,000.00
0.333
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
333,350.00
24,975.00
358,325.00
358,325.00
53,748.75
412,073.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Kode
L.01
Satua Koefisie
n
n
OH
6.667
Harga
Satuan
(Rp)
50,000.00
Jumlah
Harga
(Rp)
333,350.00
Mandor
B
BAHAN
D
E
F
L.04
OH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
0.033
75,000.00
JUMLAH TENAGA KERJA
2,475.00
335,825.00
335,825.00
50,373.75
386,198.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Panel Beton Pracetak
Kolom Beton Pracetak
Semen PC
Pasir Beton
Koral Beton
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.375
50,000.00
0.125
70,000.00
0.012
75,000.00
0.019
75,000.00
JUMLAH TENAGA KERJA
18,750.00
8,750.00
900.00
1,425.00
29,825.00
Lbr
Btg
Kg
m3
m3
0.986 #
#VALUE!
0.525 #
#VALUE!
45.000
1,500.00
67,500.00
0.074
174,500.00
12,913.00
0.146
170,588.47
24,905.92
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
PERALATAN
Kode
L.01
L.04
Satua Koefisie
n
n
OH
OH
Harga
Satuan
(Rp)
0.750
50,000.00
0.025
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
37,500.00
1,875.00
39,375.00
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
39,375.00
5,906.25
45,281.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
PERALATAN
D
E
F
Kode
L.01
L.04
Satua Koefisie
n
n
OH
OH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga
Satuan
(Rp)
0.900
50,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
45,000.00
3,375.00
48,375.00
48,375.00
7,256.25
55,631.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
PERALATAN
D
E
F
Kode
L.01
L.04
Satua Koefisie
n
n
OH
OH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga
Satuan
(Rp)
1.050
50,000.00
0.067
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
52,500.00
5,025.00
57,525.00
57,525.00
8,628.75
66,153.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
Satua Koefisie
Kode
n
n
L.01
L.04
OH
OH
Harga
Satuan
(Rp)
1.000
50,000.00
0.032
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
50,000.00
2,400.00
52,400.00
BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
52,400.00
7,860.00
60,260.00
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Mandor
Satua Koefisie
Kode
n
n
L.01
L.04
OH
OH
Harga
Satuan
(Rp)
1.200
50,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
60,000.00
3,375.00
63,375.00
BAHAN
PERALATAN
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
63,375.00
9,506.25
72,881.25
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Mandor
Satua Koefisie
Kode
n
n
L.01
L.04
OH
OH
Harga
Satuan
(Rp)
0.330
50,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
16,500.00
750.00
17,250.00
BAHAN
PERALATAN
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
17,250.00
2,587.50
19,837.50
15% x D
No
A
Uraian
TENAGA
Dipakai rumus K = a/275 x
(L+75)
K = (Pekerja / 275) x (Jarak +
75)
Satua Koefisie
Kode
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
31,818.18
D
E
F
31,818.18
BAHAN
PERALATAN
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
31,818.18
4,772.73
36,590.91
15% x D
No
A
Uraian
Satua Koefisie
n
n
TENAGA
Dipakai rumus K = a/275 x
(L+75)
K = (Pekerja / 275) x (Jarak +
75)
BAHAN
PERALATAN
D
E
F
Kode
Harga
Satuan
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Jumlah
Harga
(Rp)
50,000.00
50,000.00
50,000.00
7,500.00
57,500.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Kode
L.01
L.04
Satua Koefisie
n
n
OH
OH
Harga
Satuan
(Rp)
0.250
50,000.00
0.025
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
12,500.00
1,875.00
14,375.00
15% x D
14,375.00
2,156.25
16,531.25
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
PERALATAN
D
E
F
Kode
Satua Koefisie
n
n
L.01
L.04
OH
OH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga
Satuan
(Rp)
0.500
50,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
25,000.00
3,750.00
28,750.00
28,750.00
4,312.50
33,062.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
Satua Koefisie
Kode
n
n
L.01
L.04
BAHAN
Pasir Urug
OH
OH
m3
Harga
Satuan
(Rp)
0.300
50,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA
1.200
132,400.00
Jumlah
Harga
(Rp)
15,000.00
750.00
15,750.00
158,880.00
158,880.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
174,630.00
26,194.50
200,824.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
Ijuk
Satua Koefisie
Kode
n
n
L.01
L.04
OH
OH
kg
Harga
Satuan
(Rp)
0.150
50,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
6.000
40,000.00
7,500.00
1,125.00
8,625.00
240,000.00
240,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
15% x D
248,625.00
37,293.75
285,918.75
No
A
Uraian
TENAGA
Pekerja
Mandor
Kode
L.01
L.04
BAHAN
Sirtu
Satua Koefisie
n
n
OH
OH
m3
Harga
Satuan
(Rp)
0.250
50,000.00
0.025
75,000.00
JUMLAH TENAGA KERJA
1.200
122,900.00
Jumlah
Harga
(Rp)
12,500.00
1,875.00
14,375.00
147,480.00
147,480.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
161,855.00
24,278.25
186,133.25
15% x D
PEKERJAAN PONDASI
A.3.2.1.2. Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
75,000.00
52,500.00
5,625.00
5,625.00
138,750.00
m3
Kg
m3
1.200
195,400.00
163.000
1,500.00
0.520
158,300.00
JUMLAH HARGA BAHAN
234,480.00
244,500.00
82,316.00
561,296.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
700,046.00
105,006.90
805,052.90
15% x D
A.3.2.1.2aPemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP (Batu belah 60%,Blonos 40%)
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
1.500
0.750
0.075
0.075
Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
75,000.00
Jumlah
Harga
(Rp)
75,000.00
52,500.00
5,625.00
5,625.00
BAHAN
Batu Belah
Batu kali/blonos
Semen Portland
Pasir Pasang
m3
m3
Kg
m3
138,750.00
0.720
195,400.00
0.480
176,200.00
163.000
1,500.00
0.520
158,300.00
JUMLAH HARGA BAHAN
140,688.00
84,576.00
244,500.00
82,316.00
552,080.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
690,830.00
103,624.50
794,454.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
75,000.00
52,500.00
5,625.00
5,625.00
138,750.00
m3
Kg
m3
1.200
195,400.00
136.000
1,500.00
0.544
158,300.00
JUMLAH HARGA BAHAN
234,480.00
204,000.00
86,115.20
524,595.20
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
663,345.20
99,501.78
762,846.98
15% x D
A.3.2.1.3aPemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 5PP (Batu belah 60%,Blonos 40%)
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Batu kali/blonos
Semen Portland
Pasir Pasang
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
75,000.00
52,500.00
5,625.00
5,625.00
138,750.00
m3
m3
Kg
m3
0.720
195,400.00
0.480
176,200.00
136.000
1,500.00
0.544
158,300.00
JUMLAH HARGA BAHAN
140,688.00
84,576.00
204,000.00
86,115.20
515,379.20
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
654,129.20
98,119.38
752,248.58
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
75,000.00
52,500.00
5,625.00
5,625.00
138,750.00
m3
Kg
m3
1.200
195,400.00
117.000
1,500.00
0.561
158,300.00
JUMLAH HARGA BAHAN
234,480.00
175,500.00
88,806.30
498,786.30
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
637,536.30
95,630.45
733,166.75
15% x D
A.3.2.1.4aPemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 6PP (Batu belah 60%,Blonos 40%)
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Batu Belah
Batu kali/blonos
Semen Portland
Pasir Pasang
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
75,000.00
52,500.00
5,625.00
5,625.00
138,750.00
m3
m3
Kg
m3
0.720
195,400.00
0.480
176,200.00
117.000
1,500.00
0.561
158,300.00
JUMLAH HARGA BAHAN
140,688.00
84,576.00
175,500.00
88,806.30
489,570.30
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
628,320.30
94,248.05
722,568.35
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
Batu Belah
Semen Portland
Pasir Pasang
OH
OH
OH
OH
1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
75,000.00
52,500.00
5,625.00
5,625.00
138,750.00
m3
Kg
m3
1.200
195,400.00
91.000
1,500.00
0.584
158,300.00
JUMLAH HARGA BAHAN
234,480.00
136,500.00
92,447.20
463,427.20
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
602,177.20
90,326.58
692,503.78
15% x D
A.3.2.1.5aPemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 8PP (Batu belah 60%,Blonos 40%)
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Batu Belah
Batu kali/blonos
Semen Portland
Pasir Pasang
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
75,000.00
52,500.00
5,625.00
5,625.00
138,750.00
m3
m3
Kg
m3
0.720
195,400.00
0.480
176,200.00
91.000
1,500.00
0.584
158,300.00
JUMLAH HARGA BAHAN
140,688.00
84,576.00
136,500.00
92,447.20
454,211.20
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
592,961.20
88,944.18
681,905.38
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Kali/Blonos
Pasir urug
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.780
50,000.00
0.390
70,000.00
0.039
75,000.00
0.039
75,000.00
JUMLAH TENAGA KERJA
39,000.00
27,300.00
2,925.00
2,925.00
72,150.00
m3
m3
1.200
176,200.00
0.432
132,400.00
JUMLAH HARGA BAHAN
211,440.00
57,196.80
268,636.80
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
340,786.80
51,118.02
391,904.82
15% x D
A.3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu bela
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Batu Belah
Semen Portland
Pasir Beton
Kerikil (batu pecah mesin)
Besi Beton
Kawat Beton
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
3.400
50,000.00
0.850
70,000.00
0.085
75,000.00
0.170
75,000.00
JUMLAH TENAGA KERJA
170,000.00
59,500.00
6,375.00
12,750.00
248,625.00
m3
kg
m3
m3
kg
kg
0.480
195,400.00
194.000
1,500.00
0.312
174,500.00
0.468
170,588.47
126.000
9,100.00
1.800
15,800.00
JUMLAH HARGA BAHAN
93,792.00
291,000.00
54,444.00
79,835.40
1,146,600.00
28,440.00
1,694,111.40
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1,942,736.40
291,410.46
2,234,146.86
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Pasir Beton
Kerikil (batu pecah mesin)
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
OH
OH
OH
OH
2.400
50,000.00
0.800
70,000.00
0.080
75,000.00
0.119
75,000.00
JUMLAH TENAGA KERJA
120,000.00
56,000.00
6,000.00
8,925.00
190,925.00
m3
kg
m3
m3
0.450
195,400.00
194.000
1,500.00
0.312
174,500.00
0.468
170,588.47
JUMLAH HARGA BAHAN
87,930.00
291,000.00
54,444.00
79,835.40
513,209.40
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
704,134.40
105,620.16
809,754.56
PEKERJAAN DINDING
A.4.4.1.2. Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Bata Merah
Semen Portland
Pasir Pasang
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.600
50,000.00
0.200
70,000.00
0.020
75,000.00
0.030
75,000.00
JUMLAH TENAGA KERJA
30,000.00
14,000.00
1,500.00
2,250.00
47,750.00
bh
Kg
m3
140.000
1,000.00
32.950
1,500.00
0.091
158,300.00
JUMLAH HARGA BAHAN
140,000.00
49,425.00
14,405.30
203,830.30
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
251,580.30
37,737.05
289,317.35
15% x D
A.4.4.1.4. Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Bata Merah
Semen Portland
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.600
50,000.00
0.200
70,000.00
0.020
75,000.00
0.030
75,000.00
JUMLAH TENAGA KERJA
30,000.00
14,000.00
1,500.00
2,250.00
47,750.00
bh
Kg
m3
140.000
1,000.00
22.200
1,500.00
0.102
158,300.00
JUMLAH HARGA BAHAN
140,000.00
33,300.00
16,146.60
189,446.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
237,196.60
35,579.49
272,776.09
15% x D
A.4.4.1.5. Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Satua Koefisie
Kode
n
n
L.01
L.02
OH
OH
0.600
0.200
Harga
Satuan
(Rp)
50,000.00
70,000.00
Jumlah
Harga
(Rp)
30,000.00
14,000.00
Kepala Tukang
Mandor
B
L.03
L.04
BAHAN
Bata Merah
Semen Portland
Pasir Pasang
OH
OH
0.020
75,000.00
0.030
75,000.00
JUMLAH TENAGA KERJA
1,500.00
2,250.00
47,750.00
bh
Kg
m3
140.000
1,000.00
18.500
1,500.00
0.122
158,300.00
JUMLAH HARGA BAHAN
140,000.00
27,750.00
19,312.60
187,062.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
234,812.60
35,221.89
270,034.49
15% x D
A.4.4.1.8. Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 3PP
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Bata Merah
Semen Portland
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
15,000.00
7,000.00
750.00
1,125.00
23,875.00
bh
Kg
m3
70.000
1,000.00
14.370
1,500.00
0.040
158,300.00
JUMLAH HARGA BAHAN
70,000.00
21,555.00
6,332.00
97,887.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
121,762.00
18,264.30
140,026.30
15% x D
A.4.4.1.10Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 5PP
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bata Merah
Semen Portland
Pasir Pasang
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
15,000.00
7,000.00
750.00
1,125.00
23,875.00
bh
Kg
m3
70.000
1,000.00
9.680
1,500.00
0.045
158,300.00
JUMLAH HARGA BAHAN
70,000.00
14,520.00
7,123.50
91,643.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
115,518.50
17,327.78
132,846.28
15% x D
A.4.4.1.11Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 6PP
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Bata Merah
Semen Portland
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
15,000.00
7,000.00
750.00
1,125.00
23,875.00
bh
Kg
m3
70.000
1,000.00
8.320
1,500.00
0.049
158,300.00
JUMLAH HARGA BAHAN
70,000.00
12,480.00
7,756.70
90,236.70
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
114,111.70
17,116.76
131,228.46
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
HB-20
Semen Portland
Pasir Pasang
Besi angker dia 8
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.350
50,000.00
0.150
70,000.00
0.015
75,000.00
0.018
75,000.00
JUMLAH TENAGA KERJA
17,500.00
10,500.00
1,125.00
1,350.00
30,475.00
bh
Kg
m3
Kg
12.500
2,100.00
24.260
1,500.00
0.772
158,300.00
0.280
9,100.00
JUMLAH HARGA BAHAN
26,250.00
36,390.00
122,207.60
2,548.00
187,395.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
217,870.60
32,680.59
250,551.19
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
HB - 15
Semen Portland
Pasir Pasang
Besi angker dia 8
OH
OH
OH
OH
0.320
50,000.00
0.120
70,000.00
0.012
75,000.00
0.016
75,000.00
JUMLAH TENAGA KERJA
16,000.00
8,400.00
900.00
1,200.00
26,500.00
bh
Kg
m3
Kg
12.500
1,800.00
18.200
1,500.00
0.582
158,300.00
0.280
9,100.00
JUMLAH HARGA BAHAN
22,500.00
27,300.00
92,130.60
2,548.00
144,478.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
170,978.60
25,646.79
196,625.39
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
HB - 10
Semen Portland
Pasir Pasang
Besi angker dia 8
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
15,000.00
7,000.00
750.00
1,125.00
23,875.00
bh
Kg
m3
Kg
12.500
1,620.00
12.130
1,500.00
0.388
158,300.00
0.280
9,100.00
JUMLAH HARGA BAHAN
20,250.00
18,195.00
61,420.40
2,548.00
102,413.40
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
126,288.40
18,943.26
145,231.66
15% x D
PEKERJAAN PLESTERAN
A.4.4.2.3. Pemasangan 1m plesteran 1 PC :3 PP tebal 15 mm
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.300
50,000.00
0.150
70,000.00
0.015
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
15,000.00
10,500.00
1,125.00
1,125.00
27,750.00
Portland Cement
Pasir Pasang
C
Kg
m3
7.776
1,500.00
0.023
158,300.00
JUMLAH HARGA BAHAN
11,664.00
3,640.90
15,304.90
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
43,054.90
6,458.24
49,513.14
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Portland Cement
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.300
50,000.00
0.150
70,000.00
0.015
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
15,000.00
10,500.00
1,125.00
1,125.00
27,750.00
Kg
m3
5.184
1,500.00
0.026
158,300.00
JUMLAH HARGA BAHAN
7,776.00
4,115.80
11,891.80
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
39,641.80
5,946.27
45,588.07
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Portland Cement
Pasir Pasang
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.300
50,000.00
0.150
70,000.00
0.015
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
15,000.00
10,500.00
1,125.00
1,125.00
27,750.00
Kg
m3
4.416
1,500.00
0.027
158,300.00
JUMLAH HARGA BAHAN
6,624.00
4,274.10
10,898.10
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
38,648.10
5,797.22
44,445.32
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Portland Cement
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.080
50,000.00
0.400
70,000.00
0.040
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
4,000.00
28,000.00
3,000.00
300.00
35,300.00
Kg
m3
0.500
1,500.00
0.013
158,300.00
JUMLAH HARGA BAHAN
750.00
2,057.90
2,807.90
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
38,107.90
5,716.19
43,824.09
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Portland Cement
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.080
50,000.00
0.040
70,000.00
0.004
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
4,000.00
2,800.00
300.00
300.00
7,400.00
Kg
m3
0.500
1,500.00
0.013
158,300.00
JUMLAH HARGA BAHAN
750.00
2,057.90
2,807.90
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
10,207.90
1,531.19
11,739.09
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Portland Cement
Pasir Pasang
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
15,000.00
7,000.00
750.00
1,125.00
23,875.00
Kg
m3
4.320
1,500.00
0.006
158,300.00
JUMLAH HARGA BAHAN
6,480.00
949.80
7,429.80
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
31,304.80
4,695.72
36,000.52
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Portland Cement
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
7,500.00
5,250.00
600.00
600.00
13,950.00
Kg
3.108
1,500.00
JUMLAH HARGA BAHAN
4,662.00
4,662.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
18,612.00
2,791.80
21,403.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Portland Cement
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.300
50,000.00
0.150
70,000.00
0.015
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
15,000.00
10,500.00
1,125.00
1,125.00
27,750.00
Kg
m3
6.340
1,500.00
0.012
158,300.00
JUMLAH HARGA BAHAN
9,510.00
1,899.60
11,409.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
39,159.60
5,873.94
45,033.54
15% x D
A.4.4.2.27Pemasangan 1m acian
No
A
Uraian
TENAGA
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B
L.01
L.02
L.03
L.04
BAHAN
Portland Cement
OH
OH
OH
OH
0.200
50,000.00
0.100
70,000.00
0.010
75,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA
10,000.00
7,000.00
750.00
750.00
18,500.00
Kg
3.250
1,500.00
JUMLAH HARGA BAHAN
4,875.00
4,875.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
23,375.00
3,506.25
26,881.25
15% x D
PEKERJAAN BETON
A.4.1.1.1. Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA
82,500.00
19,250.00
2,100.00
6,225.00
110,075.00
Kg
Kg
Kg
ltr
247.000
1,500.00
869.000
124.64
999.000
121.85
215.000
100.00
JUMLAH HARGA BAHAN
370,500.00
108,314.64
121,727.06
21,500.00
622,041.70
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
732,116.70
109,817.51
841,934.21
15% x D
A.4.1.1.2. Membuat 1 m3 Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Kg
Kg
Kg
ltr
Harga
Satuan
(Rp)
1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA
276.000
828.000
###
215.000
1,500.00
124.64
121.85
100.00
Jumlah
Harga
(Rp)
82,500.00
19,250.00
2,100.00
6,225.00
110,075.00
414,000.00
103,204.29
123,311.09
21,500.00
662,015.38
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
772,090.38
115,813.56
887,903.94
15% x D
A.4.1.1.4. Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.200
50,000.00
0.200
70,000.00
0.020
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
60,000.00
14,000.00
1,500.00
450.00
75,950.00
Kg
Kg
Kg
ltr
230.000
1,500.00
893.000
124.64
###
121.85
200.000
100.00
JUMLAH HARGA BAHAN
345,000.00
111,306.07
125,138.83
20,000.00
601,444.90
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
677,394.90
101,609.23
779,004.13
15% x D
A.4.1.1.5. Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA
82,500.00
19,250.00
2,100.00
6,225.00
110,075.00
Kg
Kg
Kg
ltr
326.000
1,500.00
760.000
124.64
###
121.85
215.000
100.00
JUMLAH HARGA BAHAN
489,000.00
94,728.57
125,382.53
21,500.00
730,611.10
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
840,686.10
126,102.91
966,789.01
A.4.1.1.7. Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA
82,500.00
19,250.00
2,100.00
6,225.00
110,075.00
Kg
Kg
Kg
ltr
371.000
1,500.00
698.000
124.64
###
121.85
215.000
100.00
JUMLAH HARGA BAHAN
556,500.00
87,000.71
127,575.81
21,500.00
792,576.52
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
902,651.52
135,397.73
1,038,049.25
15% x D
A.4.1.1.8. Membuat 1 m3 Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA
82,500.00
19,250.00
2,100.00
6,225.00
110,075.00
Kg
Kg
Kg
ltr
384.000
1,500.00
692.000
124.64
###
121.85
215.000
100.00
JUMLAH HARGA BAHAN
576,000.00
86,252.86
126,601.01
21,500.00
810,353.87
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
920,428.87
138,064.33
1,058,493.20
15% x D
CATATAN :
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
A.4.1.1.17Pembesian 10 kg dengan besi polos atau besi ulir
No
A
Uraian
TENAGA
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Pekerja
Tukang Besi
Kepala Tukang
Mandor
B
L.01
L.02
L.03
L.04
BAHAN
Besi Beton (Polos/Ulir)
Kawat Beton
OH
OH
OH
OH
0.070
50,000.00
0.070
70,000.00
0.007
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
3,500.00
4,900.00
525.00
300.00
9,225.00
Kg
Kg
10.500
9,100.00
0.150
15,800.00
JUMLAH HARGA BAHAN
95,550.00
2,370.00
97,920.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga per-Kg
15% x D
A.4.1.1.17a
107,145.00
16,071.75
123,216.75
12,321.68
No
A
Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Besi Beton (Polos/Ulir)
Kawat Beton
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.0070
50,000.00
0.0070
70,000.00
0.0007
75,000.00
0.0004
75,000.00
JUMLAH TENAGA KERJA
350.00
490.00
52.50
30.00
922.50
Kg
Kg
1.0500
9,100.00
0.0150
15,800.00
JUMLAH HARGA BAHAN
9,555.00
237.00
9,792.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
10,714.50
1,607.18
12,321.68
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Besi Beton (Polos/Ulir)
Kawat Beton
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.0070
50,000.00
0.0070
70,000.00
0.0007
75,000.00
0.0004
75,000.00
JUMLAH TENAGA KERJA
350.00
490.00
52.50
30.00
922.50
Kg
Kg
1.0500
9,250.00
0.0150
15,800.00
JUMLAH HARGA BAHAN
9,712.50
237.00
9,949.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
10,872.00
1,630.80
12,502.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Jaring Kawat Baja dilas
Kawat Beton
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.025
50,000.00
0.025
70,000.00
0.025
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
1,250.00
1,750.00
1,875.00
75.00
4,950.00
Kg
Kg
10.200 #
#VALUE!
0.050
15,800.00
JUMLAH HARGA BAHAN
#VALUE!
790.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 10 cm
Minyak Bekisting
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.520
50,000.00
0.260
70,000.00
0.026
75,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA
26,000.00
18,200.00
1,950.00
1,950.00
48,100.00
m3
Kg
Ltr
0.040
2,722,400.00
0.300
18,800.00
0.100
20,000.00
JUMLAH HARGA BAHAN
108,896.00
5,640.00
2,000.00
116,536.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
164,636.00
24,695.40
189,331.40
15% x D
No
A
Uraian
TENAGA
Pekerja
Kode
L.01
Satua Koefisie
n
n
OH
0.520
Harga
Satuan
(Rp)
50,000.00
Jumlah
Harga
(Rp)
26,000.00
Tukang Kayu
Kepala Tukang
Mandor
B
L.02
L.03
L.04
BAHAN
Papan Kayu Lokal
Paku Biasa 5 - 10 cm
Minyak Bekisting
OH
OH
OH
0.260
70,000.00
0.026
75,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA
18,200.00
1,950.00
1,950.00
48,100.00
m3
Kg
Ltr
0.040
1,469,000.00
0.300
18,800.00
0.100
20,000.00
JUMLAH HARGA BAHAN
58,760.00
5,640.00
2,000.00
66,400.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
114,500.00
17,175.00
131,675.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 10 cm
Minyak Bekisting
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.520
50,000.00
0.260
70,000.00
0.026
75,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA
26,000.00
18,200.00
1,950.00
1,950.00
48,100.00
m3
Kg
Ltr
0.045
2,722,400.00
0.300
18,800.00
0.100
20,000.00
JUMLAH HARGA BAHAN
122,508.00
5,640.00
2,000.00
130,148.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
178,248.00
26,737.20
204,985.20
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 10 cm
Minyak Bekisting
PERALATAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.520
50,000.00
0.260
70,000.00
0.026
75,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA
26,000.00
18,200.00
1,950.00
1,950.00
48,100.00
m3
Kg
Ltr
0.023
2,722,400.00
0.300
18,800.00
0.100
20,000.00
JUMLAH HARGA BAHAN
61,254.00
5,640.00
2,000.00
68,894.00
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
116,994.00
17,549.10
134,543.10
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Kls. III
Triplek 9 mm
Dolken Ky Galam Dia 8-10
cm/4 m
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Lbr
Btg
0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.015
4,730,000.00
0.350
107,800.00
2.000
19,900.00
JUMLAH HARGA BAHAN
108,896.00
7,520.00
4,000.00
70,950.00
37,730.00
39,800.00
268,896.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
329,946.00
49,491.90
379,437.90
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
JUMLAH HARGA BAHAN
108,896.00
7,520.00
4,000.00
120,416.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
181,466.00
27,219.90
208,685.90
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
0.020
2,722,400.00
0.400
18,800.00
0.200
20,000.00
JUMLAH HARGA BAHAN
54,448.00
7,520.00
4,000.00
65,968.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
127,018.00
19,052.70
146,070.70
15% x D
A.4.1.1.22Pemasangan 1 m2 bekisting untuk kolom (kolom ekspose tinggi maksimal 4 meter, 2x pakai)
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Balok Kayu Lokal 5/7
Paku Biasa 5 - 12 cm
Minyak Bekisting
Stoot Bambu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
m3
Kg
Ltr
Btg
0.020
2,722,400.00
0.008
1,145,500.00
0.400
18,800.00
0.200
20,000.00
1.000
14,250.00
JUMLAH HARGA BAHAN
54,448.00
8,591.25
7,520.00
4,000.00
14,250.00
88,809.25
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
149,859.25
22,478.89
172,338.14
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Kls III
Triplek 9 mm
Dolken Ky Galam Dia 8-10
cm/4 m
m3
Kg
Ltr
m3
Lbr
Btg
0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.018
1,145,500.00
0.350
107,800.00
2.000
19,900.00
JUMLAH HARGA BAHAN
108,896.00
7,520.00
4,000.00
20,619.00
37,730.00
39,800.00
218,565.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
279,615.00
41,942.25
321,557.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
JUMLAH HARGA BAHAN
108,896.00
7,520.00
4,000.00
120,416.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
181,466.00
27,219.90
208,685.90
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Cetak Pinus
Balok Kayu Lokal 5/7
Paku Biasa 5 - 12 cm
Minyak Bekisting
PERALATAN
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
m3
Kg
Ltr
0.020
2,722,400.00
0.009
1,145,500.00
0.400
18,800.00
0.200
20,000.00
JUMLAH HARGA BAHAN
54,448.00
10,309.50
7,520.00
4,000.00
76,277.50
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
137,327.50
20,599.13
157,926.63
15% x D
A.4.1.1.23Pemasangan 1 m2 bekisting untuk balok (balok gantung tinggi maksimal 4 meter, 2x pakai)
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal 5/7
Stoot Bambu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Btg
0.020
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.009
1,145,500.00
2.500
14,250.00
JUMLAH HARGA BAHAN
54,448.00
7,520.00
4,000.00
10,309.50
35,625.00
111,902.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
172,952.50
25,942.88
198,895.38
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 9 mm
Dolken Ky Galam Dia 8-10
cm/4 m
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Lbr
Btg
0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.015
1,145,500.00
0.350
107,800.00
6.000
19,900.00
JUMLAH HARGA BAHAN
108,896.00
7,520.00
4,000.00
17,182.50
37,730.00
119,400.00
294,728.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
355,778.50
53,366.78
409,145.28
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Lbr
Btg
0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.015
1,145,500.00
0.350
84,700.00
6.000
14,250.00
JUMLAH HARGA BAHAN
108,896.00
7,520.00
4,000.00
17,182.50
29,645.00
85,500.00
252,743.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
313,793.50
47,069.03
360,862.53
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Kayu Lokal
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Lbr
Btg
0.040
1,469,000.00
0.400
18,800.00
0.200
20,000.00
0.015
1,145,500.00
0.350
84,700.00
6.000
14,250.00
JUMLAH HARGA BAHAN
58,760.00
7,520.00
4,000.00
17,182.50
29,645.00
85,500.00
202,607.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
263,657.50
39,548.63
303,206.13
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 9 mm
Dolken Ky Galam Dia 8-10
cm/4
m jarak bekisting/spacer
Penjaga
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Lbr
Btg
Buah
0.030
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.020
1,145,500.00
0.350
107,800.00
3.000
19,900.00
4.000
5,000.00
JUMLAH HARGA BAHAN
81,672.00
7,520.00
4,000.00
22,910.00
37,730.00
59,700.00
20,000.00
233,532.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
294,582.00
44,187.30
338,769.30
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m
Penjaga jarak bekisting/spacer
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Lbr
Btg
Buah
0.030
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.020
1,145,500.00
0.350
84,700.00
3.000
14,250.00
4.000
5,000.00
JUMLAH HARGA BAHAN
81,672.00
7,520.00
4,000.00
22,910.00
29,645.00
42,750.00
20,000.00
208,497.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
269,547.00
40,432.05
309,979.05
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Satua Koefisie
Kode
n
n
L.01
L.02
OH
OH
0.660
0.330
Harga
Satuan
(Rp)
50,000.00
70,000.00
Jumlah
Harga
(Rp)
33,000.00
23,100.00
Kepala Tukang
Mandor
B
L.03
L.04
BAHAN
Papan Cetak Kayu Lokal
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m
OH
OH
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Lbr
Btg
0.030
1,469,000.00
0.400
18,800.00
0.200
20,000.00
0.020
1,145,500.00
0.350
84,700.00
3.000
14,250.00
JUMLAH HARGA BAHAN
44,070.00
7,520.00
4,000.00
22,910.00
29,645.00
42,750.00
150,895.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
211,945.00
31,791.75
243,736.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Kayu Lokal
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.990
50,000.00
0.495
70,000.00
0.050
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
49,500.00
34,650.00
3,712.50
3,712.50
91,575.00
m3
Kg
Ltr
m3
Lbr
Btg
0.060
1,469,000.00
0.800
18,800.00
0.400
20,000.00
0.040
1,145,500.00
0.700
84,700.00
6.000
14,250.00
JUMLAH HARGA BAHAN
88,140.00
15,040.00
8,000.00
45,820.00
59,290.00
85,500.00
301,790.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
393,365.00
59,004.75
452,369.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Klas III
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
OH
OH
OH
OH
m3
Harga
Satuan
(Rp)
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
0.030
2,722,400.00
Jumlah
Harga
(Rp)
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
81,672.00
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Dolken Ky Galam Dia 8-10
cm/4 m
C
Kg
Ltr
m3
Lbr
Btg
0.400
18,800.00
0.150
20,000.00
0.015
4,730,000.00
0.350
107,800.00
2.000
19,900.00
JUMLAH HARGA BAHAN
7,520.00
3,000.00
70,950.00
37,730.00
39,800.00
240,672.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
301,722.00
45,258.30
346,980.30
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
m3
Kg
Ltr
m3
Lbr
Btg
0.030
2,722,400.00
0.400
18,800.00
0.150
20,000.00
0.015
1,145,500.00
0.350
84,700.00
2.000
14,250.00
JUMLAH HARGA BAHAN
81,672.00
7,520.00
3,000.00
17,182.50
29,645.00
28,500.00
167,519.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
228,569.50
34,285.43
262,854.93
15% x D
A.4.1.1.27Pemasangan 1 m2 bekisting untuk plat penutup saluran (papan cetak kayu lokal)
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Terentang (Papan Kayu
Lokal)
Paku Biasa 5 - 12 cm
Bambu Dia 8-10 cm/4 m
PERALATAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.150
50,000.00
0.050
70,000.00
0.005
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
7,500.00
3,500.00
375.00
600.00
11,975.00
m3
kg
btg
0.026
1,469,000.00
0.600
18,800.00
0.500
14,250.00
JUMLAH HARGA BAHAN
38,781.60
11,280.00
7,125.00
57,186.60
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
69,161.60
10,374.24
79,535.84
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Lantai kerja tebal 10 cm
Besi hollow 50.50.3
Kayu kaso 5/7
Phenol film 12mm
Minyak begisting
Dinabolt dia 12mm (10-15cm)
Satua Koefisie
Kode
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.007
50,000.00
0.076
70,000.00
0.008
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
350.00
5,320.00
600.00
75.00
6,345.00
A.4.1
.1.4
m3
Kg
m3
Lbr
L
Bh
0.080
779,004.13
62,320.33
9.394
12,800.00
120,243.20
0.005
4,730,000.00
23,650.00
0.080 #
#VALUE!
0.200
20,000.00
4,000.00
3.882
7,920.00
30,745.44
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai )
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kayu kaso 5/7
Phenol film 12mm
Minyak begisting
Dinabolt dia 12mm (10-15cm)
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.004
50,000.00
0.038
70,000.00
0.004
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
200.00
2,660.00
300.00
75.00
3,235.00
m3
Lbr
L
Bh
0.005
4,730,000.00
23,650.00
0.043 #
#VALUE!
0.200
20,000.00
4,000.00
0.693
7,920.00
5,488.56
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
#VALUE!
#VALUE!
#VALUE!
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10-12 kali pakai )
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kayu kaso 5/7
Phenol film 12mm
Minyak begisting
Paku 5-7 cm
Dinabolt dia 12mm (10-15cm)
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.004
50,000.00
0.038
70,000.00
0.004
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
200.00
2,660.00
300.00
75.00
3,235.00
m3
Lbr
L
Kg
Bh
0.004
4,730,000.00
18,920.00
0.048 #
#VALUE!
0.200
20,000.00
4,000.00
0.046
18,800.00
864.80
0.693
7,920.00
5,488.56
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Mandor
BAHAN
PERALATAN
D
E
F
Kode
L.01
L.04
Satua Koefisie
n
n
OH
OH
OH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga
Satuan
(Rp)
0.053
50,000.00
0.018
70,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
2,650.00
1,260.00
375.00
4,285.00
4,285.00
642.75
4,927.75
15% x D
A.4.1.2.9. Pemasangan dan membuka begisting 1 buah komponen balok beton pracetak
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Mandor
Kode
L.01
L.04
Satua Koefisie
n
n
OH
OH
OH
Harga
Satuan
(Rp)
0.089
50,000.00
0.030
70,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
4,450.00
2,100.00
375.00
6,925.00
BAHAN
JUMLAH HARGA BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
6,925.00
1,038.75
7,963.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Mandor
BAHAN
PERALATAN
D
E
F
Kode
L.01
L.04
Satua
Koefisien
n
OH
OH
OH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga
Satuan
(Rp)
0.071
50,000.00
0.024
70,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
3,550.00
1,680.00
375.00
5,605.00
5,605.00
840.75
6,445.75
15% x D
No
A
B
C
D
E
F
Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Vibrator
Kepala Tukang
Mandor
Kode
L.01
L.02
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.064
50,000.00
0.244
70,000.00
0.128
70,000.00
0.034
75,000.00
0.073
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
3,200.00
17,080.00
8,960.00
2,550.00
5,475.00
37,265.00
BAHAN
JUMLAH HARGA BAHAN
PERALATAN
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
37,265.00
5,589.75
42,854.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Vibrator
Kode
L.01
L.02
L.02
Satua Koefisie
n
n
OH
OH
OH
0.069
0.242
0.138
Harga
Satuan
(Rp)
50,000.00
70,000.00
70,000.00
Jumlah
Harga
(Rp)
3,450.00
16,940.00
9,660.00
Kepala Tukang
Mandor
B
C
D
E
F
L.03
L.04
OH
OH
0.037
75,000.00
0.073
75,000.00
JUMLAH TENAGA KERJA
2,775.00
5,475.00
38,300.00
BAHAN
JUMLAH HARGA BAHAN
PERALATAN
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
38,300.00
5,745.00
44,045.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Vibrator
Kepala Tukang
Mandor
BAHAN
PERALATAN
D
E
F
Satua Koefisie
Kode
n
n
L.01
L.02
L.02
L.03
L.04
OH
OH
OH
OH
OH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga
Satuan
(Rp)
0.061
50,000.00
0.213
70,000.00
0.122
70,000.00
0.033
75,000.00
0.073
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
3,050.00
14,910.00
8,540.00
2,475.00
5,475.00
34,450.00
34,450.00
5,167.50
39,617.50
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Erection
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.02
L.03
L.04
BAHAN
Solar
PERALATAN
Sewa Crane
Sewa Pipe Support
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
E51
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
OH
0.067
50,000.00
0.067
70,000.00
0.134
70,000.00
0.067
75,000.00
0.067
75,000.00
JUMLAH TENAGA KERJA
3,350.00
4,690.00
9,380.00
5,025.00
5,025.00
27,470.00
6.676
9,200.00
JUMLAH HARGA BAHAN
61,419.20
61,419.20
UH
UH
0.067
384,114.29
25,735.66
1.100 #
#VALUE!
JUMLAH HARGA ALAT
#VALUE!
15% x D
#VALUE!
#VALUE!
#VALUE!
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Erection
Operator Crane
Pembantu Operator Crane
Kepala Tukang
Mandor
Kode
L.01
L.02
L.02
L.03
L.04
BAHAN
Solar
PERALATAN
Sewa Crane
Sewa Schaffolding
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
OH
OH
OH
0.061
50,000.00
0.061
70,000.00
0.122
70,000.00
0.061
65,000.00
0.061
45,000.00
0.061
75,000.00
0.061
75,000.00
JUMLAH TENAGA KERJA
3,050.00
4,270.00
8,540.00
3,965.00
2,745.00
4,575.00
4,575.00
31,720.00
6.110
9,200.00
JUMLAH HARGA BAHAN
56,212.00
56,212.00
UH
UH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
0.061
384,114.29
23,430.97
1.100 #
#VALUE!
JUMLAH HARGA ALAT
#VALUE!
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Erection
Operator Crane
Pembantu Operator Crane
Kepala Tukang
Mandor
Kode
L.01
L.02
L.02
L.03
L.04
BAHAN
Solar
PERALATAN
Sewa Crane
Sewa Pipe Support
E51
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
OH
OH
OH
0.083
50,000.00
0.083
70,000.00
0.166
70,000.00
0.083
65,000.00
0.083
45,000.00
0.083
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA
4,150.00
5,810.00
11,620.00
5,395.00
3,735.00
6,225.00
6,225.00
43,160.00
8.277
9,200.00
JUMLAH HARGA BAHAN
76,148.40
76,148.40
UH
UH
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
0.083
384,114.29
31,881.49
2.200 #
#VALUE!
JUMLAH HARGA ALAT
#VALUE!
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Kode
L.01
Satua Koefisie
n
n
OH
0.019
Harga
Satuan
(Rp)
50,000.00
Jumlah
Harga
(Rp)
950.00
Tukang Batu
Operator Crane
Pembantu Operator Crane
B
D
E
F
L.02
BAHAN
Solar
PERALATAN
Sewa Crane
E51
OH
OH
OH
0.038
70,000.00
0.019
65,000.00
0.019
45,000.00
JUMLAH TENAGA KERJA
2,660.00
1,235.00
855.00
5,700.00
1.897
9,200.00
JUMLAH HARGA BAHAN
17,452.40
17,452.40
UH
0.019
384,114.29
JUMLAH HARGA ALAT
7,298.17
7,298.17
7,298.17
30,450.57
4,567.59
35,018.16
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Batu
Operator Crane
Pembantu Operator Crane
Kode
L.01
L.02
BAHAN
Solar
PERALATAN
Sewa Crane
E51
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.019
50,000.00
0.038
70,000.00
0.019
65,000.00
0.019
45,000.00
JUMLAH TENAGA KERJA
950.00
2,660.00
1,235.00
855.00
5,700.00
1.897
9,200.00
JUMLAH HARGA BAHAN
17,452.40
17,452.40
UH
0.019
384,114.29
JUMLAH HARGA ALAT
7,298.17
7,298.17
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
30,450.57
4,567.59
35,018.16
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Batu
Operator Crane
Pembantu Operator Crane
Kode
L.01
L.02
BAHAN
Solar
PERALATAN
Sewa Crane
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
E51
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.019
50,000.00
0.038
70,000.00
0.019
65,000.00
0.019
45,000.00
JUMLAH TENAGA KERJA
950.00
2,660.00
1,235.00
855.00
5,700.00
1.897
9,200.00
JUMLAH HARGA BAHAN
17,452.40
17,452.40
UH
0.019
384,114.29
JUMLAH HARGA ALAT
7,298.17
7,298.17
15% x D
30,450.57
4,567.59
35,018.16
No
Uraian
TENAGA
BAHAN
Semen Grout
Screening
Air
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Kg
Kg
L
1,200.00 #
#VALUE!
650.00 #
#VALUE!
350.00
100.00
35,000.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
Uraian
TENAGA
BAHAN
Semen Grout
Air
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Kg
L
1,850.00 #
#VALUE!
400.00
100.00
40,000.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Tukang Batu
Kepala Tukang
Mandor
BAHAN
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Kode
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
Harga
Satuan
(Rp)
0.367
70,000.00
0.074
75,000.00
0.037
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
25,690.00
5,550.00
2,775.00
34,015.00
15% x D
34,015.00
5,102.25
39,117.25
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kayu kaso 5/7
Papan cor
Paku 5-7 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.147
50,000.00
0.147
70,000.00
0.015
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
7,350.00
10,290.00
1,125.00
375.00
19,140.00
m3
m3
Kg
0.012
4,730,000.00
0.004
1,469,000.00
0.264
18,800.00
JUMLAH HARGA BAHAN
56,760.00
5,876.00
4,963.20
67,599.20
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
86,739.20
13,010.88
99,750.08
15% x D
No
A
B
C
D
E
F
Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Besi
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.02
L.04
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.220
50,000.00
0.220
70,000.00
0.220
70,000.00
0.110
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
11,000.00
15,400.00
15,400.00
8,250.00
50,050.00
BAHAN
JUMLAH HARGA BAHAN
PERALATAN
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
50,050.00
7,507.50
57,557.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.250
50,000.00
0.125
70,000.00
0.013
75,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
12,500.00
8,750.00
975.00
975.00
23,200.00
Ubin granit
Semen Portlan
Semen Warna
Pasir pasang
C
Bh
kg
kg
m3
6.630
28,216.67
9.800
1,500.00
1.300
2,300.00
0.045
158,300.00
JUMLAH HARGA BAHAN
187,076.50
14,700.00
2,990.00
7,123.50
211,890.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
235,090.00
35,263.50
270,353.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Ubin granit
Semen Portlan
Semen Warna
Pasir pasang
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.260
50,000.00
0.130
70,000.00
0.013
75,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA
13,000.00
9,100.00
975.00
975.00
24,050.00
Bh
kg
kg
m3
11.870
11,363.64
10.000
1,500.00
1.500
2,300.00
0.045
158,300.00
JUMLAH HARGA BAHAN
134,886.36
15,000.00
3,450.00
7,123.50
160,459.86
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
184,509.86
27,676.48
212,186.34
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin granit
Semen Portlan
Semen Warna
Pasir pasang
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.090
50,000.00
0.090
70,000.00
0.009
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
4,500.00
6,300.00
675.00
375.00
11,850.00
Bh
kg
kg
m3
2.650
4,400.00
1.140
1,500.00
0.100
2,300.00
0.003
158,300.00
JUMLAH HARGA BAHAN
11,660.00
1,710.00
230.00
474.90
14,074.90
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
25,924.90
3,888.74
29,813.64
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Plint Ubin granit
Semen Portlan
Semen Warna
Pasir pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.090
50,000.00
0.090
70,000.00
0.009
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
4,500.00
6,300.00
675.00
375.00
11,850.00
Bh
kg
kg
m3
3.530
3,850.00
1.140
1,500.00
0.100
2,300.00
0.003
158,300.00
JUMLAH HARGA BAHAN
13,590.50
1,710.00
230.00
474.90
16,005.40
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
27,855.40
4,178.31
32,033.71
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Ubin keramik
Semen Portlan
Pasir pasang
Semen Warna
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
Bh
kg
m3
kg
11.870
4,400.00
10.000
1,500.00
0.045
158,300.00
1.500
2,300.00
JUMLAH HARGA BAHAN
52,228.00
15,000.00
7,123.50
3,450.00
77,801.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
142,551.50
21,382.73
163,934.23
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
Keramik
Semen Portlan
Semen Warna
Pasir pasang
OH
OH
OH
OH
0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
Bh
kg
kg
m3
6.630
8,700.00
10.000
1,500.00
1.500
2,300.00
0.045
158,300.00
JUMLAH HARGA BAHAN
57,681.00
15,000.00
3,450.00
7,123.50
83,254.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
148,004.50
22,200.68
170,205.18
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Ubin keramik
Semen Portlan
Pasir pasang
Semen Warna
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
Bh
kg
m3
kg
11.870
4,681.82
10.000
1,500.00
0.045
158,300.00
1.500
2,300.00
JUMLAH HARGA BAHAN
55,573.18
15,000.00
7,123.50
3,450.00
81,146.68
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
145,896.68
21,884.50
167,781.18
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Keramik
Semen Portlan
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Bh
kg
Harga
Satuan
(Rp)
0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
6.630
10.000
9,366.67
1,500.00
Jumlah
Harga
(Rp)
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
62,101.00
15,000.00
Semen Warna
Pasir pasang
C
kg
m3
1.500
2,300.00
0.045
158,300.00
JUMLAH HARGA BAHAN
3,450.00
7,123.50
87,674.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
152,424.50
22,863.68
175,288.18
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Ubin keramik
Semen Portlan
Pasir pasang
Semen warna
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
Bh
kg
m3
kg
26.500
2,184.00
10.400
1,500.00
0.045
158,300.00
1.620
2,300.00
JUMLAH HARGA BAHAN
57,876.00
15,600.00
7,123.50
3,726.00
84,325.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
149,075.50
22,361.33
171,436.83
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint keramik
Semen Portlan
Pasir Pasang
Semen Warna
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.090
50,000.00
0.090
70,000.00
0.035
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
4,500.00
6,300.00
2,625.00
375.00
13,800.00
Bh
kg
m3
kg
5.300
5,000.00
1.140
1,500.00
0.003
158,300.00
0.025
2,300.00
JUMLAH HARGA BAHAN
26,500.00
1,710.00
474.90
57.50
28,742.40
PERALATAN
JUMLAH HARGA ALAT
D
E
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
15% x D
42,542.40
6,381.36
48,923.76
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Plint keramik
Semen Portlan
Pasir Pasang
Semen Warna
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.090
50,000.00
0.090
70,000.00
0.035
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
4,500.00
6,300.00
2,625.00
375.00
13,800.00
Bh
kg
m3
kg
5.300
2,750.00
0.570
1,500.00
0.002
158,300.00
0.013
2,300.00
JUMLAH HARGA BAHAN
14,575.00
855.00
237.45
29.90
15,697.35
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
29,497.35
4,424.60
33,921.95
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Marmer
Semen Portlan
Pasir pasang
Semen warna
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
Bh
kg
m3
kg
1.060 #
#VALUE!
8.190
1,500.00
12,285.00
0.045
158,300.00
7,123.50
0.650
2,300.00
1,495.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Kode
L.01
Satua Koefisie
n
n
OH
0.170
Harga
Satuan
(Rp)
50,000.00
Jumlah
Harga
(Rp)
8,500.00
Tukang Kayu
Kepala Tukang
Mandor
B
L.02
L.03
L.04
BAHAN
Karpet
Lem
OH
OH
OH
0.170
70,000.00
0.017
75,000.00
0.009
75,000.00
JUMLAH TENAGA KERJA
11,900.00
1,275.00
675.00
22,350.00
m2
Kg
1.050
15,200.00
0.350
23,000.00
JUMLAH HARGA BAHAN
15,960.00
8,050.00
24,010.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
46,360.00
6,954.00
53,314.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Underlayer
Lem
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.120
50,000.00
0.120
70,000.00
0.012
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
6,000.00
8,400.00
900.00
450.00
15,750.00
m2
Kg
1.050 #
#VALUE!
0.350
23,000.00
8,050.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Parquet
Lem
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
m2
Kg
1.050 #
#VALUE!
0.600
23,000.00
13,800.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
Jumlah (A+B+C)
#VALUE!
E
F
15% x D
#VALUE!
#VALUE!
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Keramik Artistik
Semen Portland
Pasir Pasang
Semen Warna
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.900
50,000.00
0.450
70,000.00
0.045
75,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA
45,000.00
31,500.00
3,375.00
3,375.00
83,250.00
Bh
Kg
m3
Kg
53.000 #
#VALUE!
9.300
1,500.00
13,950.00
0.018
158,300.00
2,849.40
2.750
2,300.00
6,325.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Keramik
Semen Portland
Pasir Pasang
Semen Warna
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.900
50,000.00
0.450
70,000.00
0.045
75,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA
45,000.00
31,500.00
3,375.00
3,375.00
83,250.00
Bh
Kg
m3
Kg
53.000
1,100.00
9.300
1,500.00
0.018
158,300.00
2.750
2,300.00
JUMLAH HARGA BAHAN
58,300.00
13,950.00
2,849.40
6,325.00
81,424.40
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
164,674.40
24,701.16
189,375.56
15% x D
No
A
Uraian
TENAGA
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B
L.01
L.02
L.03
L.04
BAHAN
Keramik
Semen Portland
Pasir Pasang
Semen Warna
OH
OH
OH
OH
0.900
50,000.00
0.450
70,000.00
0.045
75,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA
45,000.00
31,500.00
3,375.00
3,375.00
83,250.00
Bh
Kg
m3
Kg
26.500
2,150.00
9.300
1,500.00
0.018
158,300.00
1.940
2,300.00
JUMLAH HARGA BAHAN
56,975.00
13,950.00
2,849.40
4,462.00
78,236.40
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
161,486.40
24,222.96
185,709.36
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Keramik
Semen Portland
Pasir Pasang
Semen Warna
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.900
50,000.00
0.450
70,000.00
0.045
75,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA
45,000.00
31,500.00
3,375.00
3,375.00
83,250.00
Bh
Kg
m3
Kg
21.200
2,730.00
9.300
1,500.00
0.018
158,300.00
1.940
2,300.00
JUMLAH HARGA BAHAN
57,876.00
13,950.00
2,849.40
4,462.00
79,137.40
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
162,387.40
24,358.11
186,745.51
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu tempel hitam
Semen Portland
Pasir Pasang
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
m2
Kg
m3
Harga
Satuan
(Rp)
0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
1.100
11.750
0.035
120,000.00
1,500.00
158,300.00
Jumlah
Harga
(Rp)
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
132,000.00
17,625.00
5,540.50
155,165.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
219,915.50
32,987.33
252,902.83
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Wallpaper
Lem
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.350
50,000.00
0.175
70,000.00
0.017
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
17,500.00
12,250.00
1,275.00
150.00
31,175.00
m
Kg
2.200
64,800.00
0.250
23,000.00
JUMLAH HARGA BAHAN
142,560.00
5,750.00
148,310.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
179,485.00
26,922.75
206,407.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Floor Hardener
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Kg
Harga
Satuan
(Rp)
0.120
50,000.00
0.120
70,000.00
0.012
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
5.000 #
JUMLAH HARGA BAHAN
Jumlah
Harga
(Rp)
6,000.00
8,400.00
900.00
450.00
15,750.00
#VALUE!
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
#VALUE!
#VALUE!
#VALUE!
PEKERJAAN KAYU
A.4.6.1.1 Pembuatan dan Pemasangan 1 m kusen pintu dan kusen jendela, kayu kelas I
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok kayu (Jati Perum)
Paku 10 cm
Lem kayu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
7.000
50,000.00
21.000
70,000.00
2.100
75,000.00
0.350
75,000.00
JUMLAH TENAGA KERJA
350,000.00
1,470,000.00
157,500.00
26,250.00
2,003,750.00
m3
Kg
kg
1.100 10,540,400.00
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN
11,594,440.00
26,250.00
16,000.00
11,636,690.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
13,640,440.00
2,046,066.00
15,686,506.00
15% x D
A.4.6.1.2. Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu kelas II & III
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok Kayu (Kruing)
Paku 10 cm
Lem kayu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
6.000
50,000.00
18.000
70,000.00
1.800
75,000.00
0.300
75,000.00
JUMLAH TENAGA KERJA
300,000.00
1,260,000.00
135,000.00
22,500.00
1,717,500.00
m3
kg
kg
1.200
6,470,000.00
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN
7,764,000.00
26,250.00
16,000.00
7,806,250.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
9,523,750.00
1,428,562.50
10,952,312.50
15% x D
A.4.6.1.2a Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu jati (perum)
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu (Jati Perum)
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
OH
OH
OH
OH
m3
Harga
Satuan
(Rp)
6.000
50,000.00
18.000
70,000.00
1.800
75,000.00
0.300
75,000.00
JUMLAH TENAGA KERJA
1.200
10,540,400.00
Jumlah
Harga
(Rp)
300,000.00
1,260,000.00
135,000.00
22,500.00
1,717,500.00
12,648,480.00
Paku 10 cm
Lem kayu
C
kg
kg
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN
26,250.00
16,000.00
12,690,730.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
14,408,230.00
2,161,234.50
16,569,464.50
15% x D
A.4.6.1.2b Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu bengkirai
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok Kayu (Bengkirai)
Paku 10 cm
Lem kayu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
6.000
50,000.00
18.000
70,000.00
1.800
75,000.00
0.300
75,000.00
JUMLAH TENAGA KERJA
300,000.00
1,260,000.00
135,000.00
22,500.00
1,717,500.00
m3
kg
kg
1.200 10,466,700.00
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN
12,560,040.00
26,250.00
16,000.00
12,602,290.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
14,319,790.00
2,147,968.50
16,467,758.50
15% x D
A.4.6.1.2c Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu kruing
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu (Kruing)
Paku 10 cm
Lem kayu
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
OH
OH
OH
OH
6.000
50,000.00
18.000
70,000.00
1.800
75,000.00
0.300
75,000.00
JUMLAH TENAGA KERJA
300,000.00
1,260,000.00
135,000.00
22,500.00
1,717,500.00
m3
kg
kg
1.200
6,350,000.00
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN
7,620,000.00
26,250.00
16,000.00
7,662,250.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
9,379,750.00
1,406,962.50
10,786,712.50
A.4.6.1.5. Pembuatan dan pemasangan 1 m daun pintu panel, kayu kelas I & II
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan kayu (Jati)
Lem kayu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.000
50,000.00
3.000
70,000.00
0.300
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
50,000.00
210,000.00
22,500.00
3,750.00
286,250.00
m3
kg
0.040 10,826,400.00
0.500
16,000.00
JUMLAH HARGA BAHAN
433,056.00
8,000.00
441,056.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
727,306.00
Overhead + Profit 15%
Overh
15% x D
109,095.90
ead
+
Harga Satuan Pekerjaan (D+E)
836,401.90
Profit
15%
A.4.6.1.5a Pembuatan dan pemasangan
1 m daun pintu panel, kayu jati (perum)
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Kayu Jati (Perum)
Lem kayu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.000
50,000.00
3.000
70,000.00
0.300
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
50,000.00
210,000.00
22,500.00
3,750.00
286,250.00
m3
kg
0.040 10,826,400.00
0.500
16,000.00
JUMLAH HARGA BAHAN
433,056.00
8,000.00
441,056.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
15% x D
Overh
Harga Satuan Pekerjaan (D+E) ead +
Profit
15%
A.4.6.1.5b Pembuatan dan pemasangan
1 m daun pintu panel, kayu bengkirai
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Papan Kayu Bengkirai
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
OH
OH
OH
OH
m3
Harga
Satuan
(Rp)
1.000
50,000.00
3.000
70,000.00
0.300
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
0.040
11,925,000.00
727,306.00
109,095.90
836,401.90
Jumlah
Harga
(Rp)
50,000.00
210,000.00
22,500.00
3,750.00
286,250.00
477,000.00
Lem kayu
C
kg
0.500
16,000.00
JUMLAH HARGA BAHAN
8,000.00
485,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Overh
15% x D
Harga Satuan Pekerjaan (D+E) ead +
Profit
15%
A.4.6.1.5c Pembuatan dan pemasangan
1 m daun pintu panel, kayu kruing
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Kayu Kruing
Lem kayu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
771,250.00
115,687.50
886,937.50
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.000
50,000.00
3.000
70,000.00
0.300
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
50,000.00
210,000.00
22,500.00
3,750.00
286,250.00
m3
kg
0.040
6,350,000.00
0.500
16,000.00
JUMLAH HARGA BAHAN
254,000.00
8,000.00
262,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
548,250.00
Overhead + Profit 15%
15% x D
82,237.50
Overh
ead
+
Harga Satuan Pekerjaan (D+E)
630,487.50
Profit
A.4.6.1.6. Pembuatan dan pemasangan15%
1 m pintu dan jendela kaca, kayu kelas I & II
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Papan kayu (Jati)
Lem kayu
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.800
50,000.00
2.400
70,000.00
0.240
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA
40,000.00
168,000.00
18,000.00
3,000.00
229,000.00
m3
kg
0.024 10,826,400.00
0.300
16,000.00
JUMLAH HARGA BAHAN
259,833.60
4,800.00
264,633.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
493,633.60
74,045.04
567,678.64
15% x D
A.4.6.1.6aPembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu jati (perum)
No
Uraian
Satua Koefisie
Kode
n
n
Harga
Jumlah
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan kayu (Jati)
Lem kayu
Satua Koefisie
n
n
Satuan
(Rp)
Harga
(Rp)
OH
OH
OH
OH
0.800
50,000.00
2.400
70,000.00
0.240
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA
40,000.00
168,000.00
18,000.00
3,000.00
229,000.00
m3
kg
0.024 10,826,400.00
0.300
16,000.00
JUMLAH HARGA BAHAN
259,833.60
4,800.00
264,633.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
493,633.60
74,045.04
567,678.64
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Kayu Bengkirai
Lem kayu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.800
50,000.00
2.400
70,000.00
0.240
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA
40,000.00
168,000.00
18,000.00
3,000.00
229,000.00
m3
kg
0.024 11,925,000.00
0.300
16,000.00
JUMLAH HARGA BAHAN
286,200.00
4,800.00
291,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
520,000.00
78,000.00
598,000.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Papan Kayu Kruing
Lem kayu
PERALATAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.800
50,000.00
2.400
70,000.00
0.240
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA
40,000.00
168,000.00
18,000.00
3,000.00
229,000.00
m3
kg
0.024
6,350,000.00
0.300
16,000.00
JUMLAH HARGA BAHAN
152,400.00
4,800.00
157,200.00
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
386,200.00
57,930.00
444,130.00
15% x D
A.4.6.1.13Pembuatan dan pemasangan 1 m Konstruksi Kuda-kuda konvensional, kayu kelas I , II, & III b
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok kayu (Kruing)
Besi strip tebal 5mm
Paku 12 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
4.000
50,000.00
12.000
70,000.00
1.200
75,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA
200,000.00
840,000.00
90,000.00
15,000.00
1,145,000.00
m3
Kg
kg
1.100
6,470,000.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN
7,117,000.00
123,000.00
117,600.00
7,357,600.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
8,502,600.00
1,275,390.00
9,777,990.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok Kayu Jati (Perum)
Besi strip tebal 5mm
Paku 12 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
4.000
50,000.00
12.000
70,000.00
1.200
75,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA
200,000.00
840,000.00
90,000.00
15,000.00
1,145,000.00
m3
Kg
kg
1.100 10,540,400.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN
11,594,440.00
123,000.00
117,600.00
11,835,040.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
12,980,040.00
1,947,006.00
14,927,046.00
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
Jumlah
Harga
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok Kayu Bengkirai
Besi strip tebal 5mm
Paku 12 cm
Satua Koefisie
n
n
(Rp)
(Rp)
OH
OH
OH
OH
4.000
50,000.00
12.000
70,000.00
1.200
75,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA
200,000.00
840,000.00
90,000.00
15,000.00
1,145,000.00
m3
Kg
kg
1.100 10,158,400.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN
11,174,240.00
123,000.00
117,600.00
11,414,840.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
12,559,840.00
1,883,976.00
14,443,816.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok Kayu Kruing
Besi strip tebal 5mm
Paku 12 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
4.000
50,000.00
12.000
70,000.00
1.200
75,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA
200,000.00
840,000.00
90,000.00
15,000.00
1,145,000.00
m3
Kg
kg
1.100
6,470,000.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN
7,117,000.00
123,000.00
117,600.00
7,357,600.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
8,502,600.00
1,275,390.00
9,777,990.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu Jati
Besi strip tebal 5mm
Paku 12 cm
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
m3
Kg
kg
Harga
Satuan
(Rp)
6.700
50,000.00
20.100
70,000.00
2.010
75,000.00
0.335
75,000.00
JUMLAH TENAGA KERJA
1.200
15.000
5.600
10,540,400.00
8,200.00
21,000.00
Jumlah
Harga
(Rp)
335,000.00
1,407,000.00
150,750.00
25,125.00
1,917,875.00
12,648,480.00
123,000.00
117,600.00
12,889,080.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
14,806,955.00
2,221,043.25
17,027,998.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok Kayu Bengkirai
Besi strip tebal 5mm
Paku 12 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
6.700
50,000.00
20.100
70,000.00
2.010
75,000.00
0.335
75,000.00
JUMLAH TENAGA KERJA
335,000.00
1,407,000.00
150,750.00
25,125.00
1,917,875.00
m3
Kg
kg
1.200 10,158,400.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN
12,190,080.00
123,000.00
117,600.00
12,430,680.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
14,348,555.00
2,152,283.25
16,500,838.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu Kruing
Besi strip tebal 5mm
Paku 12 cm
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
6.700
50,000.00
20.100
70,000.00
2.010
75,000.00
0.335
75,000.00
JUMLAH TENAGA KERJA
335,000.00
1,407,000.00
150,750.00
25,125.00
1,917,875.00
m3
Kg
kg
1.200
6,470,000.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN
7,764,000.00
123,000.00
117,600.00
8,004,600.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
9,922,475.00
1,488,371.25
11,410,846.25
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok Kayu Jati
Besi strip tebal 5mm
Paku 12 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
2.400
50,000.00
7.200
70,000.00
0.720
75,000.00
0.120
75,000.00
JUMLAH TENAGA KERJA
120,000.00
504,000.00
54,000.00
9,000.00
687,000.00
m3
Kg
kg
1.100 10,540,400.00
15.000
8,200.00
3.000
21,000.00
JUMLAH HARGA BAHAN
11,594,440.00
123,000.00
63,000.00
11,780,440.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
12,467,440.00
1,870,116.00
14,337,556.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok Kayu Bengkirai
Besi strip tebal 5mm
Paku 12 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
2.400
50,000.00
7.200
70,000.00
0.720
75,000.00
0.120
75,000.00
JUMLAH TENAGA KERJA
120,000.00
504,000.00
54,000.00
9,000.00
687,000.00
m3
Kg
kg
1.100 10,158,400.00
15.000
8,200.00
3.000
21,000.00
JUMLAH HARGA BAHAN
11,174,240.00
123,000.00
63,000.00
11,360,240.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
12,047,240.00
1,807,086.00
13,854,326.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu Kruing
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
OH
OH
OH
OH
m3
Harga
Satuan
(Rp)
2.400
50,000.00
7.200
70,000.00
0.720
75,000.00
0.120
75,000.00
JUMLAH TENAGA KERJA
1.100
6,470,000.00
Jumlah
Harga
(Rp)
120,000.00
504,000.00
54,000.00
9,000.00
687,000.00
7,117,000.00
Kg
kg
15.000
8,200.00
3.000
21,000.00
JUMLAH HARGA BAHAN
123,000.00
63,000.00
7,303,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
7,990,000.00
1,198,500.00
9,188,500.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 2 x 3 (Jati)
Paku 5 dan 10 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
7,250,000.00
0.036
6,095,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN
101,500.00
219,420.00
4,700.00
325,620.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
338,745.00
50,811.75
389,556.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 3 x 4 (Bengkir)
Paku 5 dan 10 cm
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
7,250,000.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN
101,500.00
46,163.70
4,700.00
152,363.70
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
165,488.70
24,823.31
190,312.01
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 cm (Kruing)
Reng 3 x 4 (Kruing)
Paku 5 dan 10 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
4,730,000.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN
66,220.00
46,163.70
4,700.00
117,083.70
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
130,208.70
19,531.31
149,740.01
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 cm (Kempas)
Reng 3 x 4 (Kempas)
Paku 5 dan 10 cm
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
4,354,300.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN
60,960.20
46,163.70
4,700.00
111,823.90
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
124,948.90
18,742.34
143,691.24
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
5,000.00
7,000.00
750.00
375.00
13,125.00
BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 2 x 3 (Bengkir)
Paku 5 dan 10 cm
m3
m3
kg
0.014
7,250,000.00
0.003
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN
101,500.00
23,081.85
4,700.00
129,281.85
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
142,406.85
21,361.03
163,767.88
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 cm (Kruing)
Reng 2 x 3 (Kruing)
Paku 5 dan 10 cm
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
4,730,000.00
0.003
4,470,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN
66,220.00
14,751.00
4,700.00
85,671.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
98,796.00
14,819.40
113,615.40
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Kaso-kaso 5 x 7 cm (Kempas)
Reng 2 x 3 (Kempas)
Paku 5 dan 10 cm
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
4,354,300.00
0.003
3,538,900.00
0.250
18,800.00
JUMLAH HARGA BAHAN
60,960.20
11,678.37
4,700.00
77,338.57
PERALATAN
JUMLAH HARGA ALAT
D
E
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
15% x D
90,463.57
13,569.54
104,033.11
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 2 x 3 (Jati)
Paku 5 dan 10 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
7,250,000.00
0.057
6,095,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN
101,500.00
347,415.00
4,700.00
453,615.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
466,740.00
70,011.00
536,751.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 3 x 4 (Bengkir)
Paku 5 dan 10 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
7,250,000.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN
101,500.00
46,163.70
4,700.00
152,363.70
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
165,488.70
24,823.31
190,312.01
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Kode
L.01
L.02
L.03
Satua Koefisie
n
n
OH
OH
OH
0.100
0.100
0.010
Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
Jumlah
Harga
(Rp)
5,000.00
7,000.00
750.00
Mandor
B
L.04
BAHAN
Kaso-kaso 5 x 7 cm (Kruing)
Reng 3 x 4 (Kruing)
Paku 5 dan 10 cm
OH
0.005
75,000.00
JUMLAH TENAGA KERJA
375.00
13,125.00
m3
m3
kg
0.014
4,730,000.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN
66,220.00
46,163.70
4,700.00
117,083.70
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
130,208.70
19,531.31
149,740.01
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 cm (Kempas)
Reng 3 x 4 (Kempas)
Paku 5 dan 10 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
m3
m3
kg
0.014
4,354,300.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN
60,960.20
46,163.70
4,700.00
111,823.90
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
124,948.90
18,742.34
143,691.24
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Kaso-kaso 5 x 7 (kruing)
Paku 7 - 10 cm
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.150
50,000.00
0.300
70,000.00
0.030
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
7,500.00
21,000.00
2,250.00
5,625.00
36,375.00
m3
kg
0.015
4,730,000.00
0.200
18,800.00
JUMLAH HARGA BAHAN
72,842.00
3,760.00
76,602.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
112,977.00
E
F
15% x D
16,946.55
129,923.55
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 (Kempas)
Paku 7 - 10 cm
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.150
50,000.00
0.300
70,000.00
0.030
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA
7,500.00
21,000.00
2,250.00
5,625.00
36,375.00
m3
kg
0.015
4,354,300.00
0.200
18,800.00
JUMLAH HARGA BAHAN
67,056.22
3,760.00
70,816.22
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
107,191.22
16,078.68
123,269.90
15% x D
A.4.6.1.20 Pemasangan 1 m rangka langit-langit (60 x 60), kayu kelas II atau III
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 (kruing)
Paku 7 - 10 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.200
50,000.00
0.300
70,000.00
0.030
75,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA
10,000.00
21,000.00
2,250.00
750.00
34,000.00
m3
kg
0.016
4,730,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN
77,099.00
4,700.00
81,799.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
115,799.00
17,369.85
133,168.85
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
0.200
0.300
0.030
0.010
Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
75,000.00
Jumlah
Harga
(Rp)
10,000.00
21,000.00
2,250.00
750.00
BAHAN
Kaso-kaso 5 x 7 (kruing)
Paku 7 - 10 cm
m3
kg
34,000.00
0.016
4,730,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN
77,099.00
4,700.00
81,799.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
115,799.00
17,369.85
133,168.85
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Kaso-kaso 5 x 7 (kempas)
Paku 7 - 10 cm
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.200
50,000.00
0.300
70,000.00
0.030
75,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA
10,000.00
21,000.00
2,250.00
750.00
34,000.00
m3
kg
0.016
4,354,300.00
0.250
18,800.00
JUMLAH HARGA BAHAN
70,975.09
4,700.00
75,675.09
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
109,675.09
16,451.26
126,126.35
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Papan Kayu (bengkir)
Paku 7 - 10 cm
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.200
70,000.00
0.020
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
14,000.00
1,500.00
375.00
20,875.00
m3
kg
0.011 12,133,400.00
0.100
18,800.00
JUMLAH HARGA BAHAN
131,040.72
1,880.00
132,920.72
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
153,795.72
23,069.36
176,865.08
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Kayu (Bengkirai)
Paku 7 - 10 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.200
70,000.00
0.020
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
14,000.00
1,500.00
375.00
20,875.00
m3
kg
0.007 12,133,400.00
0.100
18,800.00
JUMLAH HARGA BAHAN
87,360.48
1,880.00
89,240.48
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
110,115.48
16,517.32
126,632.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Papan Kayu (Kruing)
Paku 7 - 10 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.200
70,000.00
0.020
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
14,000.00
1,500.00
375.00
20,875.00
m3
kg
0.007
7,190,000.00
0.100
18,800.00
JUMLAH HARGA BAHAN
51,768.00
1,880.00
53,648.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
74,523.00
11,178.45
85,701.45
15% x D
A.4.6.1.23Pemasangan 1 m rangka dinding pemisah (60 x 120 ) cm, kayu kelas II atau III
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok kayu (kruing)
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
OH
OH
OH
OH
m3
Harga
Satuan
(Rp)
0.150
50,000.00
0.450
70,000.00
0.045
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
0.028
6,350,000.00
Jumlah
Harga
(Rp)
7,500.00
31,500.00
3,375.00
600.00
42,975.00
177,800.00
paku 5 dan 7 cm
C
Kg
0.150
18,800.00
JUMLAH HARGA BAHAN
2,820.00
180,620.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
223,595.00
33,539.25
257,134.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Balok kayu (Bengkir)
paku 5 dan 7 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.150
50,000.00
0.450
70,000.00
0.045
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
7,500.00
31,500.00
3,375.00
600.00
42,975.00
m3
Kg
0.028 #
#VALUE!
0.150
18,800.00
2,820.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok kayu (Kruing)
paku 5 dan 7 cm
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.150
50,000.00
0.450
70,000.00
0.045
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
7,500.00
31,500.00
3,375.00
600.00
42,975.00
m3
Kg
0.028 #
#VALUE!
0.150
18,800.00
2,820.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
#VALUE!
#VALUE!
#VALUE!
No
A
Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Besi Profil
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
3,000.00
4,200.00
450.00
225.00
7,875.00
Kg
1.150
9,850.00
JUMLAH HARGA BAHAN
11,327.50
11,327.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
19,202.50
2,880.38
22,082.88
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Besi Profil
Menie Besi
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
3,000.00
4,200.00
450.00
225.00
7,875.00
Kg
Kg
1.150
9,850.00
0.060
24,100.00
JUMLAH HARGA BAHAN
11,327.50
1,446.00
12,773.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
20,648.50
3,097.28
23,745.78
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor
BAHAN
Besi Kanal CNP
Menie Besi
Kode
L.01
L.03
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
3,000.00
4,200.00
450.00
225.00
7,875.00
Kg
Kg
1.150
10,000.00
0.060
24,100.00
JUMLAH HARGA BAHAN
11,500.00
1,446.00
12,946.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
20,821.00
3,123.15
23,944.15
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.03
L.03
L.04
BAHAN
Besi Baja IWF
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
3,000.00
4,200.00
450.00
225.00
7,875.00
Kg
1.150
11,500.00
JUMLAH HARGA BAHAN
13,225.00
13,225.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
21,100.00
3,165.00
24,265.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Besi Baja IWF
Menie Besi
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
3,000.00
4,200.00
450.00
225.00
7,875.00
Kg
Kg
1.150
11,500.00
0.060
24,100.00
JUMLAH HARGA BAHAN
13,225.00
1,446.00
14,671.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
22,546.00
3,381.90
25,927.90
15% x D
No
A
Uraian
TENAGA
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
B
D
E
F
L.01
L.03
L.03
L.04
BAHAN
Solar
Minyak Pelumas
PERALATAN
Sewa Alat (Welding Machine)
E63
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.001
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
75.00
375.00
12,450.00
Liter
Liter
1.000
9,200.00
0.100
30,000.00
JUMLAH HARGA BAHAN
9,200.00
3,000.00
12,200.00
Jam
0.800
24,924.29
JUMLAH HARGA ALAT
19,939.43
19,939.43
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
44,589.43
6,688.41
51,277.84
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Solar
Minyak Pelumas
PERALATAN
Sewa Alat (Welding Machine)
E63
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.001
50,000.00
0.001
70,000.00
0.00001
75,000.00
0.00005
75,000.00
JUMLAH TENAGA KERJA
50.00
70.00
0.75
3.75
124.50
Liter
Liter
0.010
9,200.00
0.001
30,000.00
JUMLAH HARGA BAHAN
92.00
30.00
122.00
Jam
0.008
24,924.29
JUMLAH HARGA ALAT
199.39
199.39
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
445.89
66.88
512.78
15% x D
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No
A
Uraian
TENAGA
Pekerja
Tukang Las Biasa
Kepala Tukang
Mandor
BAHAN
Besi siku L 30.30.3
Besi plat baja
Kawat las
Satua Koefisie
Kode
n
n
L.01
L.03
L.03
L.04
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.050
50,000.00
1.050
70,000.00
0.105
75,000.00
0.052
75,000.00
JUMLAH TENAGA KERJA
52,500.00
73,500.00
7,875.00
3,900.00
137,775.00
Kg
Kg
Kg
15.000
9,850.00
147,750.00
32.800 #
#VALUE!
0.050
30,000.00
1,500.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Kawat las listrik
Solar
Minyak Pelumas
PERALATAN
Sewa Alat (Welding Machine)
E63
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.040
50,000.00
0.020
70,000.00
0.002
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
2,000.00
1,400.00
150.00
150.00
3,700.00
Kg
Liter
Liter
0.400
30,000.00
0.300
9,200.00
0.040
30,000.00
JUMLAH HARGA BAHAN
12,000.00
2,760.00
1,200.00
15,960.00
Jam
0.170
24,924.29
JUMLAH HARGA ALAT
4,237.13
4,237.13
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
23,897.13
3,584.57
27,481.70
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.03
L.03
L.04
BAHAN
Kawat las listrik
Solar
Minyak Pelumas
PERALATAN
Sewa Alat (Welding Machine)
E63
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.004
50,000.00
0.002
70,000.00
0.0002
75,000.00
0.0002
75,000.00
JUMLAH TENAGA KERJA
200.00
140.00
15.00
15.00
370.00
Kg
Liter
Liter
0.040
30,000.00
0.030
9,200.00
0.004
30,000.00
JUMLAH HARGA BAHAN
1,200.00
276.00
120.00
1,596.00
Jam
0.017
24,924.29
JUMLAH HARGA ALAT
423.71
423.71
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
2,389.71
358.46
2,748.17
15% x D
No
A
Uraian
TENAGA
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Pekerja
Tukang Las Biasa
Kepala Tukang
Mandor
B
L.01
L.03
L.03
L.04
BAHAN
Pintu gulung besi
OH
OH
OH
OH
1.200
50,000.00
1.200
70,000.00
0.120
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
m2
1.000 #
JUMLAH HARGA BAHAN
60,000.00
84,000.00
9,000.00
450.00
153,450.00
#VALUE!
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Pintu lipat
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.440
50,000.00
0.440
70,000.00
0.044
75,000.00
0.022
75,000.00
JUMLAH TENAGA KERJA
m2
1.000 #
JUMLAH HARGA BAHAN
Jumlah
Harga
(Rp)
22,000.00
30,800.00
3,300.00
1,650.00
57,750.00
#VALUE!
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor
BAHAN
Rolling door alumunium
Kode
L.01
L.03
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
1.000
50,000.00
1.000
70,000.00
0.100
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
50,000.00
70,000.00
7,500.00
3,750.00
131,250.00
m2
1.000
250,000.00
JUMLAH HARGA BAHAN
250,000.00
250,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
381,250.00
57,187.50
438,437.50
No
A
Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Profil alumunium
Skrup fixer
Sealant
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.043
50,000.00
0.043
70,000.00
0.004
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
2,150.00
3,010.00
322.50
157.50
5,640.00
m
bh
tube
1.100
98,500.00
2.000
1,550.00
0.060
13,500.00
JUMLAH HARGA BAHAN
108,350.00
3,100.00
810.00
112,260.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
117,900.00
17,685.00
135,585.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Profil alumunium 4" Silver
Skrup fixer
Sealant
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.043
50,000.00
0.043
70,000.00
0.004
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
2,150.00
3,010.00
322.50
157.50
5,640.00
m
bh
tube
1.100
98,500.00
2.000
1,550.00
0.060
13,500.00
JUMLAH HARGA BAHAN
108,350.00
3,100.00
810.00
112,260.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
117,900.00
17,685.00
135,585.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
0.043
0.043
0.004
0.002
Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
75,000.00
Jumlah
Harga
(Rp)
2,150.00
3,010.00
322.50
157.50
BAHAN
Profil alumunium 4" Brown
Skrup fixer
Sealant
m
bh
tube
5,640.00
1.100 #
#VALUE!
2.000
1,550.00
3,100.00
0.060
13,500.00
810.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Profil alumunium 4"
Alumunium strip
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.085
50,000.00
0.085
70,000.00
0.009
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
4,250.00
5,950.00
637.50
315.00
11,152.50
m
m
4.400
98,500.00
433,400.00
14.600 #
#VALUE!
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor
BAHAN
Pintu alumunium
Profil Kaca
Sealant
Kode
L.01
L.03
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
m
m
tube
Harga
Satuan
(Rp)
0.085
50,000.00
0.085
70,000.00
0.009
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
4,250.00
5,950.00
637.50
337.50
11,175.00
4.400 #
#VALUE!
4.500
3,000.00
13,500.00
0.270
13,500.00
3,645.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
Jumlah (A+B+C)
Overhead + Profit 15%
15% x D
#VALUE!
#VALUE!
#VALUE!
No
A
Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Klas II atau III
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.200
50,000.00
0.200
70,000.00
0.020
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
10,000.00
14,000.00
1,500.00
75.00
25,575.00
Lbr
Kg
m3
1.050
43,750.00
0.015
18,800.00
0.019
6,350,000.00
JUMLAH HARGA BAHAN
45,937.50
282.00
120,650.00
166,869.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
192,444.50
28,866.68
221,311.18
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
Kode
L.01
L.03
L.03
L.04
BAHAN
Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Kruing
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.200
50,000.00
0.200
70,000.00
0.020
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
10,000.00
14,000.00
1,500.00
75.00
25,575.00
Lbr
Kg
m3
1.050
43,750.00
0.015
18,800.00
0.019
6,350,000.00
JUMLAH HARGA BAHAN
45,937.50
282.00
120,650.00
166,869.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
192,444.50
28,866.68
221,311.18
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Kode
L.01
L.03
L.03
Satua Koefisie
n
n
OH
OH
OH
0.200
0.200
0.020
Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
Jumlah
Harga
(Rp)
10,000.00
14,000.00
1,500.00
Mandor
B
L.04
BAHAN
Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Kempas
OH
0.001
75,000.00
JUMLAH TENAGA KERJA
75.00
25,575.00
Lbr
Kg
m3
1.050
43,750.00
0.015
18,800.00
0.019
5,750,000.00
JUMLAH HARGA BAHAN
45,937.50
282.00
109,250.00
155,469.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
181,044.50
27,156.68
208,201.18
15% x D
A.4.2.1.20Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120 cm, dinding partisi
No
A
Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Rangka metal hollow 40.40.2
mm
Assesoris (perkuatan, las dll)
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.250
50,000.00
0.250
70,000.00
0.025
75,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA
12,500.00
17,500.00
1,875.00
975.00
32,850.00
m1
Ls
3.500
9,650.00
100% x
33,775.00
rangka
JUMLAH
HARGA BAHAN
33,775.00
33,775.00
67,550.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
100,400.00
15,060.00
115,460.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Rangka metal hollow 40.40.2
mm
Assesoris (perkuatan, las dll)
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.350
50,000.00
0.350
70,000.00
0.035
75,000.00
0.018
75,000.00
JUMLAH TENAGA KERJA
17,500.00
24,500.00
2,625.00
1,350.00
45,975.00
m1
Ls
4.000
9,650.00
100% x
38,600.00
rangka
JUMLAH
HARGA BAHAN
38,600.00
38,600.00
77,200.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
123,175.00
18,476.25
141,651.25
PEKERJAAN PLAFOND
.3
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Asbes Semen
Paku Tripleks
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.030
50,000.00
0.070
70,000.00
0.007
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
1,500.00
4,900.00
525.00
300.00
7,225.00
Lbr
Kg
1.100
18,500.00
0.010
20,000.00
JUMLAH HARGA BAHAN
20,350.00
200.00
20,550.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
27,775.00
4,166.25
31,941.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Saflex tebal 5 mm
Paku Tripleks
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.030
50,000.00
0.070
70,000.00
0.007
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
1,500.00
4,900.00
525.00
300.00
7,225.00
Lbr
Kg
1.100
15,300.00
0.010
20,000.00
JUMLAH HARGA BAHAN
16,830.00
200.00
17,030.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
24,255.00
3,638.25
27,893.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
5,000.00
7,000.00
750.00
375.00
13,125.00
BAHAN
Akustik
Paku Tripleks
Lbr
Kg
1.500
146,080.00
0.050
20,000.00
JUMLAH HARGA BAHAN
219,120.00
1,000.00
220,120.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
233,245.00
34,986.75
268,231.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Tripleks
Paku Tripleks
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
7,000.00
750.00
375.00
13,125.00
Lbr
Kg
0.375
84,700.00
0.030
20,000.00
JUMLAH HARGA BAHAN
31,762.50
600.00
32,362.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
45,487.50
6,823.13
52,310.63
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Papan
Paku Tripleks
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.800
50,000.00
0.800
70,000.00
0.080
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA
40,000.00
56,000.00
6,000.00
3,000.00
105,000.00
m3
Kg
0.015 10,826,400.00
0.010
20,000.00
JUMLAH HARGA BAHAN
162,396.00
200.00
162,596.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
267,596.00
40,139.40
307,735.40
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Gypsum Board
Paku Sekrup
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
0.050
70,000.00
0.005
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
5,000.00
3,500.00
375.00
375.00
9,250.00
Lbr
Kg
0.364
57,900.00
0.110
19,000.00
JUMLAH HARGA BAHAN
21,075.60
2,090.00
23,165.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
32,415.60
4,862.34
37,277.94
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Profil Allumunium "T"
Kawat 4 mm
Ramset
Akustik 60 x 120 cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.500
50,000.00
0.500
70,000.00
0.050
75,000.00
0.025
75,000.00
JUMLAH TENAGA KERJA
25,000.00
35,000.00
3,750.00
1,875.00
65,625.00
m'
kg
bh
Lbr
3.600
18,000.00
0.150
21,700.00
1.050
7,920.00
1.500
146,080.00
JUMLAH HARGA BAHAN
64,800.00
3,255.00
8,316.00
219,120.00
295,491.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
361,116.00
54,167.40
415,283.40
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.050
50,000.00
0.050
70,000.00
0.005
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
2,500.00
3,500.00
375.00
225.00
6,600.00
m1
Kg
1.050
4,600.00
0.010
20,000.00
JUMLAH HARGA BAHAN
4,830.00
200.00
5,030.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
11,630.00
1,744.50
13,374.50
15% x D
PEKERJAAN ATAP
A.4.5.2.1 Pemasangan Atap 1 m2 Genteng Plentong Kecil
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Genteng Plentong
OH
OH
OH
OH
Buah
Harga
Satuan
(Rp)
0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
25.000
2,150.00
Jumlah
Harga
(Rp)
7,500.00
5,250.00
562.50
600.00
13,912.50
53,750.00
53,750.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
67,662.50
10,149.38
77,811.88
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Press Jatiwangi
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Buah
Harga
Satuan
(Rp)
0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
25.000
2,400.00
7,500.00
5,250.00
562.50
600.00
13,912.50
60,000.00
60,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
73,912.50
11,086.88
84,999.38
No
A
Uraian
Kode
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
Genteng Press Kebumen
Satua Koefisie
n
n
OH
OH
OH
OH
Buah
Harga
Satuan
(Rp)
0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
25.000
2,650.00
Jumlah
Harga
(Rp)
7,500.00
5,250.00
562.50
600.00
13,912.50
66,250.00
66,250.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
80,162.50
12,024.38
92,186.88
15% x D
No
A
Uraian
Kode
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
Genteng Kodok Glasur
Satua Koefisie
n
n
OH
OH
OH
OH
Buah
Harga
Satuan
(Rp)
0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
25.000
3,350.00
Jumlah
Harga
(Rp)
7,500.00
5,250.00
600.00
600.00
13,950.00
83,750.00
83,750.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
97,700.00
14,655.00
112,355.00
15% x D
No
A
Satua Koefisie
Kode
n
n
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng
Besar
Plentong
L.01
L.02
L.03
L.04
Super
OH
OH
OH
OH
Buah
Harga
Satuan
(Rp)
0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
12.000
3,300.00
Jumlah
Harga
(Rp)
7,500.00
5,250.00
600.00
600.00
13,950.00
39,600.00
39,600.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
53,550.00
8,032.50
61,582.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Genteng Bubung Plentong
Portland Semen
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
20,000.00
14,000.00
1,500.00
150.00
35,650.00
Buah
Kg
m3
5.000
4,000.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN
20,000.00
12,000.00
5,065.60
37,065.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
72,715.60
10,907.34
83,622.94
15% x D
Harga
Satuan
A.4.5.2.4aPemasangan 1 m' Genteng Bubung Press Jatiwangi Pekerjaan (D+E)
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Bubung Jatiwangi
Portland Semen
Pasir Pasang
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
20,000.00
14,000.00
1,500.00
150.00
35,650.00
Buah
Kg
m3
5.000
4,860.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN
24,300.00
12,000.00
5,065.60
41,365.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
77,015.60
11,552.34
88,567.94
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Genteng Bubung Kebumen
Portland Semen
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
20,000.00
14,000.00
1,500.00
150.00
35,650.00
Buah
Kg
m3
5.000
4,850.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN
24,250.00
12,000.00
5,065.60
41,315.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
76,965.60
11,544.84
88,510.44
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Genteng Bubung Kodok Glasur
Portland Semen
Pasir Pasang
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
20,000.00
14,000.00
1,500.00
150.00
35,650.00
Buah
Kg
m3
5.000
4,500.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN
22,500.00
12,000.00
5,065.60
39,565.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
75,215.60
11,282.34
86,497.94
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
20,000.00
14,000.00
1,500.00
150.00
35,650.00
Genteng
Bubung
Besar
Portland Semen
Pasir Pasang
C
Plentong
Buah
Kg
m3
4.000
4,700.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN
18,800.00
12,000.00
5,065.60
35,865.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
71,515.60
10,727.34
82,242.94
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Asbes Gelombang 92 x 250
Paku Pancing 60 x 230
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.140
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
7,000.00
5,250.00
600.00
600.00
13,450.00
Lbr
Kg
0.500
92,166.67
0.120
41,200.00
JUMLAH HARGA BAHAN
46,083.33
4,944.00
51,027.33
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
64,477.33
9,671.60
74,148.93
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang 92 x 225
Paku Pancing 60 x 230
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.140
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
7,000.00
5,250.00
600.00
600.00
13,450.00
Lbr
Kg
0.600
83,083.33
0.120
41,200.00
JUMLAH HARGA BAHAN
49,850.00
4,944.00
54,794.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
68,244.00
10,236.60
78,480.60
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Asbes Gelombang 92 x 200
Paku Pancing 60 x 230
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.140
50,000.00
0.070
70,000.00
0.007
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA
7,000.00
4,900.00
525.00
525.00
12,950.00
Lbr
Kg
0.600
71,875.00
0.120
41,200.00
JUMLAH HARGA BAHAN
43,125.00
4,944.00
48,069.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
61,019.00
9,152.85
70,171.85
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Asbes Gelombang 92 x 180
Paku Pancing 60 x 230
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.140
50,000.00
0.070
70,000.00
0.007
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA
7,000.00
4,900.00
525.00
525.00
12,950.00
Lbr
Kg
0.750
58,583.33
0.120
41,200.00
JUMLAH HARGA BAHAN
43,937.50
4,944.00
48,881.50
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
61,831.50
9,274.73
71,106.23
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang 105 x 300
Paku Pancing 60 x 230
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Lbr
Kg
Harga
Satuan
(Rp)
0.140
50,000.00
0.070
70,000.00
0.007
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA
0.350
0.120
77,700.00
41,200.00
Jumlah
Harga
(Rp)
7,000.00
4,900.00
525.00
525.00
12,950.00
27,195.00
4,944.00
32,139.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
45,089.00
6,763.35
51,852.35
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Asbes Gelombang 105 x 240
Paku Pancing 60 x 230
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.140
50,000.00
0.070
70,000.00
0.007
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA
7,000.00
4,900.00
525.00
525.00
12,950.00
Lbr
Kg
0.440
43,200.00
0.120
41,200.00
JUMLAH HARGA BAHAN
19,008.00
4,944.00
23,952.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
36,902.00
5,535.30
42,437.30
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Genteng Beton
Paku Biasa 2" - 5"
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.200
50,000.00
0.100
70,000.00
0.010
75,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA
10,000.00
7,000.00
750.00
750.00
18,500.00
bh
Kg
11.000
4,350.00
0.030
18,800.00
JUMLAH HARGA BAHAN
47,850.00
564.00
48,414.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
66,914.00
10,037.10
76,951.10
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
Jumlah
Harga
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Genteng Metal
Paku Biasa " - 1"
Satua Koefisie
n
n
(Rp)
(Rp)
OH
OH
OH
OH
0.200
50,000.00
0.100
70,000.00
0.010
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
10,000.00
7,000.00
750.00
75.00
17,825.00
bh
Kg
1.020
48,000.00
0.200
18,800.00
JUMLAH HARGA BAHAN
48,960.00
3,760.00
52,720.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
70,545.00
10,581.75
81,126.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Genteng Sirap Kayu
Paku Biasa 1/2" - 1"
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.166
50,000.00
0.250
70,000.00
0.025
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
8,300.00
17,500.00
1,875.00
600.00
28,275.00
Lbr
Kg
30.000
1,400.00
0.200
18,800.00
JUMLAH HARGA BAHAN
42,000.00
3,760.00
45,760.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
74,035.00
11,105.25
85,140.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Genteng Beton
Paku Biasa 2" - 5"
Portland Semen
Pasir Pasang
Semen Warna
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
Buah
Kg
Kg
m3
Kg
Harga
Satuan
(Rp)
0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
3.500
0.050
10.800
0.032
1.000
5,500.00
18,800.00
1,500.00
158,300.00
2,300.00
Jumlah
Harga
(Rp)
20,000.00
14,000.00
1,500.00
1,500.00
37,000.00
19,250.00
940.00
16,200.00
5,065.60
2,300.00
43,755.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
80,755.60
12,113.34
92,868.94
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Nok Genteng Metal
Paku Biasa 1/2" - 1"
Satua Koefisie
n
n
OH
OH
OH
OH
Buah
Kg
Harga
Satuan
(Rp)
0.250
50,000.00
0.150
70,000.00
0.015
75,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
12,500.00
10,500.00
1,125.00
975.00
25,100.00
1.100 #
#VALUE!
0.050
18,800.00
JUMLAH HARGA BAHAN
#VALUE!
940.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Seng Plaat (90 x 180 cm) BJLS
28
Paku Biasa 1/2" - 1"
Paku Biasa 2" - 5"
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.125
50,000.00
0.250
70,000.00
0.025
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
6,250.00
17,500.00
1,875.00
450.00
26,075.00
Lbr
Kg
Kg
0.400
0.050
0.050
JUMLAH HARGA
17,500.00
1,000.00
940.00
19,440.00
43,750.00
20,000.00
18,800.00
BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
45,515.00
6,827.25
52,342.25
15% x D
No
Uraian
Satua Koefisie
Kode
n
n
Harga
Jumlah
No
A
Uraian
Kode
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satua Koefisie
n
n
L.01
L.02
L.03
L.04
BAHAN
Seng Gelombang (90 x 180
cm)
281/2" - 1"
PakuBJLS
Biasa
Satuan
(Rp)
Harga
(Rp)
OH
OH
OH
OH
0.120
50,000.00
0.060
70,000.00
0.006
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
6,000.00
4,200.00
450.00
450.00
11,100.00
Lbr
Kg
0.700
43,750.00
0.020
18,800.00
JUMLAH HARGA BAHAN
30,625.00
376.00
31,001.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
42,101.00
6,315.15
48,416.15
15% x D
No
A
Uraian
Kode
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satua Koefisie
n
n
L.01
L.02
L.03
L.04
BAHAN
Seng Plaat (90 x 180 cm) BJLS
28
Paku Biasa 1/2" - 1"
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.150
50,000.00
0.070
70,000.00
0.007
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
7,500.00
4,900.00
525.00
450.00
13,375.00
Lbr
Kg
0.300
43,750.00
0.040
18,800.00
JUMLAH HARGA BAHAN
13,125.00
752.00
13,877.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
27,252.00
4,087.80
31,339.80
15% x D
No
A
Uraian
Kode
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Alumunium Gelombang
0,55
Paku Hak Panj 15 Cm
PERALATAN
L.01
L.02
L.03
L.04
Tbl
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.150
50,000.00
0.750
70,000.00
0.080
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
7,500.00
52,500.00
6,000.00
450.00
66,450.00
Lbr
Kg
1.050 #
#VALUE!
0.020
22,600.00
JUMLAH HARGA BAHAN
#VALUE!
452.00
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Nok Standar 40 x 18
Paku Hak Panj 15 Cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.100
50,000.00
1.000
70,000.00
0.100
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
5,000.00
70,000.00
7,500.00
3,750.00
86,250.00
bh
Kg
1.200 #
#VALUE!
0.040
22,600.00
JUMLAH HARGA BAHAN
#VALUE!
904.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Alumunium Foil
Satua Koefisie
n
n
OH
OH
OH
OH
m2
Harga
Satuan
(Rp)
0.150
50,000.00
0.050
70,000.00
0.005
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
1.050 #
7,500.00
3,500.00
375.00
600.00
11,975.00
#VALUE!
Jumlah
Harga
(Rp)
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
PEKERJAAN PENGECATAN
A.4.7.1.1. Pengikisan/pengerokan 1 m2 permukaan cat lama
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
Jumlah
Harga
No
A
Uraian
TENAGA
Pekerja
Mandor
Kode
L.01
L.04
BAHAN
Soda api
Satua Koefisie
n
n
(Rp)
(Rp)
OH
OH
0.150
50,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
7,500.00
225.00
7,725.00
Kg
0.050
16,000.00
JUMLAH HARGA BAHAN
800.00
800.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
8,525.00
1,278.75
9,803.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
Kode
L.01
L.04
BAHAN
Sabun
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
0.150
50,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
7,500.00
600.00
8,100.00
Kg
0.050
9,500.00
JUMLAH HARGA BAHAN
475.00
475.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
8,575.00
1,286.25
9,861.25
15% x D
A.4.7.1.4. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No
A
Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Cat menie
Plamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.070
50,000.00
0.009
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
Kg
Kg
Kg
Kg
Bh
Kg
Lbr
0.200
0.150
0.170
0.260
0.010
0.030
0.200
JUMLAH HARGA
22,600.00
20,000.00
50,700.00
50,700.00
8,900.00
19,100.00
4,400.00
BAHAN
Jumlah
Harga
(Rp)
3,500.00
630.00
450.00
225.00
4,805.00
4,520.00
3,000.00
8,619.00
13,182.00
89.00
573.00
880.00
30,863.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
35,668.00
5,350.20
41,018.20
15% x D
A.4.7.1.4aPengecatan 1 m2 bidang kayu lama (1 lapis cat dasar, 1 lapis cat penutup)
No
A
Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.070
50,000.00
0.075
70,000.00
0.008
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
Kg
Kg
Bh
Kg
Lbr
0.170
0.170
0.010
0.030
0.200
JUMLAH HARGA
50,700.00
50,700.00
8,900.00
19,100.00
4,400.00
BAHAN
Jumlah
Harga
(Rp)
3,500.00
5,250.00
562.50
187.50
9,500.00
8,619.00
8,619.00
89.00
573.00
880.00
18,780.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
28,280.00
4,242.00
32,522.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Politur
Politur jadi
Ampelas
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.040
50,000.00
0.060
70,000.00
0.016
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
2,000.00
4,200.00
1,200.00
225.00
7,625.00
Lt
Lt
Lbr
0.150
42,000.00
0.372
45,600.00
2.000
4,400.00
JUMLAH HARGA BAHAN
6,300.00
16,963.20
8,800.00
32,063.20
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Overh
15% x D
ead
+
Harga Satuan Pekerjaan (D+E)
Profit
A.4.7.1.9. Pelaburan 1 m2 bidang kayu 15%
dengan vernis
No
Uraian
Kode
Satua Koefisie
n
n
39,688.20
5,953.23
45,641.43
Harga
Satuan
Jumlah
Harga
No
A
Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Vernis
Dempul
Ampelas
Satua Koefisie
n
n
(Rp)
(Rp)
OH
OH
OH
OH
0.160
50,000.00
0.160
70,000.00
0.016
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
8,000.00
11,200.00
1,200.00
225.00
20,625.00
Lt
Kg
Lbr
0.150
28,800.00
0.050
35,000.00
0.100
4,400.00
JUMLAH HARGA BAHAN
4,320.00
1,750.00
440.00
6,510.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
27,135.00
4,070.25
31,205.25
15% x D
A.4.7.1.10Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No
A
Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Plamuur
Cat dasar
Cat penutup (setara catylac)
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.020
50,000.00
0.063
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
1,000.00
4,410.00
472.50
225.00
6,107.50
Kg
Kg
Kg
0.100
0.100
0.260
JUMLAH HARGA
2,160.00
2,340.00
6,084.00
10,584.00
21,600.00
23,400.00
23,400.00
BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
16,691.50
2,503.73
19,195.23
15% x D
A.4.7.1.10Pengecatan 1 m2 tembok baru eksterior (1 lapis cat dasar, 2 lapis cat penutup)
No
A
Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Cat dasar
Cat penutup (setara Java)
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.020
50,000.00
0.063
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
1,000.00
4,410.00
472.50
225.00
6,107.50
Kg
Kg
0.100
23,400.00
0.260
55,000.00
JUMLAH HARGA BAHAN
2,340.00
14,300.00
16,640.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
22,747.50
3,412.13
26,159.63
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Cat dasar
Cat penutup (setara catylac)
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.028
50,000.00
0.042
70,000.00
0.004
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
1,400.00
2,940.00
315.00
225.00
4,880.00
Kg
Kg
0.120
23,400.00
0.180
23,400.00
JUMLAH HARGA BAHAN
2,808.00
4,212.00
7,020.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
11,900.00
1,785.00
13,685.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Menie besi
Kuas
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.020
50,000.00
0.200
70,000.00
0.020
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
1,000.00
14,000.00
1,500.00
187.50
16,687.50
Kg
Bh
0.100
24,100.00
0.010
8,900.00
JUMLAH HARGA BAHAN
2,410.00
89.00
2,499.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
19,186.50
2,877.98
22,064.48
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
Cat dasar
Cat antara
Cat penutup
Kuas
Pengencer
OH
OH
OH
OH
0.400
50,000.00
0.800
70,000.00
0.080
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
20,000.00
56,000.00
6,000.00
1,500.00
83,500.00
Kg
Kg
Kg
Bh
L
0.110
0.170
0.080
0.010
0.010
JUMLAH HARGA
5,500.00
8,500.00
4,000.00
89.00
191.00
18,280.00
50,000.00
50,000.00
50,000.00
8,900.00
19,100.00
BAHAN
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
101,780.00
15,267.00
117,047.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kunci tanam biasa
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.010
50,000.00
0.500
70,000.00
0.050
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
500.00
35,000.00
3,750.00
375.00
39,625.00
Bh
1.000
79,000.00
JUMLAH HARGA BAHAN
79,000.00
79,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
118,625.00
17,793.75
136,418.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kunci tanam KM
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.005
50,000.00
0.500
70,000.00
0.050
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
Bh
1.000 #
JUMLAH HARGA BAHAN
Jumlah
Harga
(Rp)
250.00
35,000.00
3,750.00
225.00
39,225.00
#VALUE!
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Kunci silinder
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.005
50,000.00
0.500
70,000.00
0.050
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
250.00
35,000.00
3,750.00
225.00
39,225.00
Bh
1.000
55,600.00
JUMLAH HARGA BAHAN
55,600.00
55,600.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
94,825.00
14,223.75
109,048.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Engsel pintu
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
750.00
10,500.00
1,125.00
60.00
12,435.00
Bh
1.000
18,500.00
JUMLAH HARGA BAHAN
18,500.00
18,500.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
30,935.00
4,640.25
35,575.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Kode
L.01
Satua Koefisie
n
n
OH
0.010
Harga
Satuan
(Rp)
50,000.00
Jumlah
Harga
(Rp)
500.00
Tukang Kayu
Kepala Tukang
Mandor
B
L.02
L.03
L.04
BAHAN
Engsel Kupu-kupu
OH
OH
OH
0.100
70,000.00
0.010
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
7,000.00
750.00
37.50
8,287.50
Bh
1.000
15,000.00
JUMLAH HARGA BAHAN
15,000.00
15,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
23,287.50
3,493.13
26,780.63
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kait Angin
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
750.00
10,500.00
1,125.00
600.00
12,975.00
Bh
1.000
5,500.00
JUMLAH HARGA BAHAN
5,500.00
5,500.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
18,475.00
2,771.25
21,246.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Door Closer
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.050
50,000.00
0.500
70,000.00
0.050
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
2,500.00
35,000.00
3,750.00
225.00
41,475.00
Bh
1.000
195,000.00
JUMLAH HARGA BAHAN
195,000.00
195,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
236,475.00
35,471.25
271,946.25
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.050
50,000.00
0.500
70,000.00
0.050
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
2,500.00
35,000.00
3,750.00
225.00
41,475.00
Bh
1.000
116,900.00
JUMLAH HARGA BAHAN
116,900.00
116,900.00
BAHAN
Door Holder
PERALATAN
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
158,375.00
23,756.25
182,131.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.010
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
500.00
7,000.00
750.00
375.00
8,625.00
Bh
1.000
16,900.00
JUMLAH HARGA BAHAN
16,900.00
16,900.00
BAHAN
Door Stop
PERALATAN
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
25,525.00
3,828.75
29,353.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Rel Pintu Sorong
PERALATAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.060
50,000.00
0.600
70,000.00
0.060
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
Bh
1.000 #
JUMLAH HARGA BAHAN
Jumlah
Harga
(Rp)
3,000.00
42,000.00
4,500.00
225.00
49,725.00
#VALUE!
#VALUE!
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
Satua Koefisie
n
n
L.01
L.02
L.03
L.04
BAHAN
Kaca tebal 3 mm
Sealant
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
750.00
10,500.00
1,125.00
60.00
12,435.00
m2
Kg
1.100
60,000.00
0.050
13,500.00
JUMLAH HARGA BAHAN
66,000.00
675.00
66,675.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
79,110.00
11,866.50
90,976.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
Satua Koefisie
n
n
L.01
L.02
L.03
L.04
BAHAN
Kaca tebal 5 mm
Sealant
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
750.00
10,500.00
1,125.00
60.00
12,435.00
m2
Kg
1.100
96,000.00
0.050
13,500.00
JUMLAH HARGA BAHAN
105,600.00
675.00
106,275.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
118,710.00
17,806.50
136,516.50
15% x D
No
A
Uraian
TENAGA
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
B
L.01
L.02
L.03
L.04
BAHAN
Kaca tebal 5 mm
OH
OH
OH
OH
0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
m2
1.100
96,000.00
750.00
10,500.00
1,125.00
60.00
12,435.00
105,600.00
105,600.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
118,035.00
17,705.25
135,740.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Kaca buram tebal 12 mm
Sealant
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.025
50,000.00
0.250
70,000.00
0.025
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA
1,250.00
17,500.00
1,875.00
97.50
20,722.50
m2
Kg
1.100
298,000.00
0.070
13,500.00
JUMLAH HARGA BAHAN
327,800.00
945.00
328,745.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
349,467.50
52,420.13
401,887.63
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kaca cermin tebal 5 mm
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
750.00
10,500.00
1,125.00
600.00
12,975.00
m2
1.100
158,800.00
JUMLAH HARGA BAHAN
174,680.00
174,680.00
PERALATAN
JUMLAH HARGA ALAT
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
187,655.00
E
F
15% x D
28,148.25
215,803.25
No
A
Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Kaca patri 5 mm
Sealant
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.075
50,000.00
0.150
70,000.00
0.015
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
3,750.00
10,500.00
1,125.00
300.00
15,675.00
m2
Kg
1.100
300,000.00
0.050
13,500.00
JUMLAH HARGA BAHAN
330,000.00
675.00
330,675.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
346,350.00
51,952.50
398,302.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Closet duduk
Perlengkapan 6 % Closet
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
3.300
50,000.00
1.100
70,000.00
0.010
75,000.00
0.160
75,000.00
JUMLAH TENAGA KERJA
165,000.00
77,000.00
750.00
12,000.00
254,750.00
Unit
Ls
1.000
373,700.00
0.060
373,700.00
JUMLAH HARGA BAHAN
373,700.00
22,422.00
396,122.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
650,872.00
97,630.80
748,502.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Satua Koefisie
Kode
n
n
L.01
L.02
OH
OH
1.000
1.500
Harga
Satuan
(Rp)
50,000.00
70,000.00
Jumlah
Harga
(Rp)
50,000.00
105,000.00
Kepala Tukang
Mandor
B
L.03
L.04
BAHAN
Closet Jongkok
Semen Portland
Pasir Pasang
OH
OH
0.150
75,000.00
0.160
75,000.00
JUMLAH TENAGA KERJA
11,250.00
12,000.00
178,250.00
Unit
Kg
M3
1.000
137,200.00
6.000
1,500.00
0.010
158,300.00
JUMLAH HARGA BAHAN
137,200.00
9,000.00
1,583.00
147,783.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
326,033.00
48,904.95
374,937.95
15% x D
No
A
Uraian
Kode
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
Urinoir
Semen Portland
Pasir Pasang
Perlengkapan 30 % Urinoir
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.000
50,000.00
1.000
70,000.00
0.100
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
50,000.00
70,000.00
7,500.00
3,750.00
131,250.00
Unit
Kg
M3
Ls
1.000
350,000.00
6.000
1,500.00
0.010
158,300.00
0.300
350,000.00
JUMLAH HARGA BAHAN
350,000.00
9,000.00
1,583.00
105,000.00
465,583.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
596,833.00
89,524.95
686,357.95
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Wastafel
Semen Portland
Pasir Pasang
Perlengkapan 12 % Wastafel
PERALATAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.200
50,000.00
1.450
70,000.00
0.150
75,000.00
0.060
75,000.00
JUMLAH TENAGA KERJA
60,000.00
101,500.00
11,250.00
4,500.00
177,250.00
Unit
Kg
M3
Ls
1.200 #
#VALUE!
6.000
1,500.00
9,000.00
0.010
158,300.00
1,583.00
0.120 #
#VALUE!
JUMLAH HARGA BAHAN
#VALUE!
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Wastafel
Semen Portland
Pasir Pasang
Perlengkapan 12 % Wastafel
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
1.200
50,000.00
1.450
70,000.00
0.150
75,000.00
0.060
75,000.00
JUMLAH TENAGA KERJA
60,000.00
101,500.00
11,250.00
4,500.00
177,250.00
Unit
Kg
M3
Ls
1.000
225,000.00
6.000
1,500.00
0.010
158,300.00
0.120
225,000.00
JUMLAH HARGA BAHAN
225,000.00
9,000.00
1,583.00
27,000.00
262,583.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
439,833.00
65,974.95
505,807.95
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Bak Air Fibreglass
Perlengkapan 12%
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
3.000
50,000.00
4.500
70,000.00
0.050
75,000.00
0.900
75,000.00
JUMLAH TENAGA KERJA
Unit
Ls
1.000 #
0.120 #
JUMLAH HARGA BAHAN
Jumlah
Harga
(Rp)
150,000.00
315,000.00
3,750.00
67,500.00
536,250.00
#VALUE!
#VALUE!
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
Jumlah
Harga
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Pipa Galvanis "
Perlengkapan 35% x pipa
Satua Koefisie
n
n
(Rp)
(Rp)
OH
OH
OH
OH
0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.027
75,000.00
JUMLAH TENAGA KERJA
2,700.00
6,300.00
675.00
2,025.00
11,700.00
M
Ls
1.200
30,600.00
0.350
30,600.00
JUMLAH HARGA BAHAN
36,720.00
10,710.00
47,430.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
59,130.00
8,869.50
67,999.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Kran Air "
Sealtape
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.010
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
500.00
7,000.00
750.00
375.00
8,625.00
bh
bh
1.000
18,600.00
0.025
3,023.13
JUMLAH HARGA BAHAN
18,600.00
75.58
18,675.58
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
27,300.58
4,095.09
31,395.66
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kran Air 3/4"
Sealtape
PERALATAN
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.010
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
500.00
7,000.00
750.00
375.00
8,625.00
bh
bh
1.000
18,900.00
0.025
3,023.13
JUMLAH HARGA BAHAN
18,900.00
75.58
18,975.58
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
27,600.58
4,140.09
31,740.66
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Pipa Galvanis 3/4"
Perlengkapan 35% x pipa
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.027
75,000.00
JUMLAH TENAGA KERJA
2,700.00
6,300.00
675.00
2,025.00
11,700.00
M
Ls
1.200
42,800.00
0.350
42,800.00
JUMLAH HARGA BAHAN
51,360.00
14,980.00
66,340.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
78,040.00
11,706.00
89,746.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Pipa Galvanis 1"
Perlengkapan 35% x pipa
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.027
75,000.00
JUMLAH TENAGA KERJA
2,700.00
6,300.00
675.00
2,025.00
11,700.00
M
Ls
1.200
55,100.00
0.350
55,100.00
JUMLAH HARGA BAHAN
66,120.00
19,285.00
85,405.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
97,105.00
14,565.75
111,670.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Kode
L.01
Satua Koefisie
n
n
OH
0.108
Harga
Satuan
(Rp)
50,000.00
Jumlah
Harga
(Rp)
5,400.00
Tukang Batu
Kepala Tukang
Mandor
B
L.02
L.03
L.04
BAHAN
Pipa Galvanis 1 "
Perlengkapan 35% x pipa
OH
OH
OH
0.180
70,000.00
0.018
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
12,600.00
1,350.00
375.00
19,725.00
M
Ls
1.200
67,400.00
0.350
67,400.00
JUMLAH HARGA BAHAN
80,880.00
23,590.00
104,470.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
124,195.00
18,629.25
142,824.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Pipa Galvanis 3"
Perlengkapan 35% x pipa
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.135
50,000.00
0.225
70,000.00
0.023
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA
6,750.00
15,750.00
1,725.00
525.00
24,750.00
M
Ls
1.200
203,200.00
0.350
203,200.00
JUMLAH HARGA BAHAN
243,840.00
71,120.00
314,960.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
339,710.00
50,956.50
390,666.50
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Galvanis 4"
Perlengkapan 35% x pipa
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.135
50,000.00
0.225
70,000.00
0.023
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA
6,750.00
15,750.00
1,725.00
525.00
24,750.00
M
Ls
1.200
283,450.00
0.350
283,450.00
JUMLAH HARGA BAHAN
340,140.00
99,207.50
439,347.50
PERALATAN
JUMLAH HARGA ALAT
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
464,097.50
E
F
15% x D
69,614.63
533,712.13
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Pipa PVC "
Perlengkapan 35% x pipa
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.036
50,000.00
0.060
70,000.00
0.006
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
1,800.00
4,200.00
450.00
150.00
6,600.00
M
Ls
1.200
10,700.00
0.350
10,700.00
JUMLAH HARGA BAHAN
12,840.00
3,745.00
16,585.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
23,185.00
3,477.75
26,662.75
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Pipa PVC 3/4"
Perlengkapan 35% x pipa
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.036
50,000.00
0.060
70,000.00
0.006
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA
1,800.00
4,200.00
450.00
150.00
6,600.00
M
Ls
1.200
12,800.00
0.350
12,800.00
JUMLAH HARGA BAHAN
15,360.00
4,480.00
19,840.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
26,440.00
3,966.00
30,406.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
0.036
0.060
0.006
0.002
Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
75,000.00
Jumlah
Harga
(Rp)
1,800.00
4,200.00
450.00
150.00
BAHAN
Pipa PVC 1"
Perlengkapan 35% x pipa
M
Ls
1.200
17,300.00
0.350
17,300.00
JUMLAH HARGA BAHAN
6,600.00
20,760.00
6,055.00
26,815.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
33,415.00
5,012.25
38,427.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
BAHAN
Pipa PVC 1 "
Perlengkapan 35% x pipa
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
2,700.00
6,300.00
675.00
225.00
9,900.00
M
Ls
1.200
23,300.00
0.350
23,300.00
JUMLAH HARGA BAHAN
27,960.00
8,155.00
36,115.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
46,015.00
6,902.25
52,917.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC 2"
Perlengkapan 35% x pipa
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
2,700.00
6,300.00
675.00
225.00
9,900.00
M
Ls
1.200
21,000.00
0.350
21,000.00
JUMLAH HARGA BAHAN
25,200.00
7,350.00
32,550.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
42,450.00
6,367.50
48,817.50
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Pipa PVC 2 "
Perlengkapan 35% x pipa
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.081
50,000.00
0.135
70,000.00
0.014
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
4,050.00
9,450.00
1,012.50
300.00
14,812.50
M
Ls
1.200
28,100.00
0.350
28,100.00
JUMLAH HARGA BAHAN
33,720.00
9,835.00
43,555.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
58,367.50
8,755.13
67,122.63
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Pipa PVC 3"
Perlengkapan 35% x pipa
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.081
50,000.00
0.135
70,000.00
0.014
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
4,050.00
9,450.00
1,012.50
300.00
14,812.50
M
Ls
1.200
40,700.00
0.350
40,700.00
JUMLAH HARGA BAHAN
48,840.00
14,245.00
63,085.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
77,897.50
11,684.63
89,582.13
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC 4"
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
OH
OH
OH
OH
Harga
Satuan
(Rp)
0.081
50,000.00
0.135
70,000.00
0.014
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
1.200
64,300.00
Jumlah
Harga
(Rp)
4,050.00
9,450.00
1,012.50
300.00
14,812.50
77,160.00
Ls
0.350
64,300.00
JUMLAH HARGA BAHAN
22,505.00
99,665.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
114,477.50
17,171.63
131,649.13
15% x D
No
A
Uraian
Kode
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Paving K.175 tebal
(setara
muntilan)
Pasir urug
L.01
L.02
L.03
L.04
cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
20,000.00
1,400.00
1,500.00
1,500.00
24,400.00
m2
m3
1.000
75,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN
75,000.00
13,902.00
88,902.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
113,302.00
16,995.30
130,297.30
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Paving Warna K.175 tebal 6 cm
(str.
PasirMuntilan)
urug
Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04
Harga
Satuan
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
20,000.00
1,400.00
1,500.00
1,500.00
24,400.00
m2
m3
1.000
85,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN
85,000.00
13,902.00
98,902.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
123,302.00
18,495.30
141,797.30
No
A
Uraian
Kode
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Paving K.175 tebal
(setara
muntilan)
Pasir urug
L.01
L.02
L.03
L.04
cm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
20,000.00
1,400.00
1,500.00
1,500.00
24,400.00
m2
m3
1.000
90,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN
90,000.00
13,902.00
103,902.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
128,302.00
19,245.30
147,547.30
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Paving warna K.175 tebal 8 cm
(str.
PasirMuntilan)
urug
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
20,000.00
1,400.00
1,500.00
1,500.00
24,400.00
m2
m3
1.000
98,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN
98,000.00
13,902.00
111,902.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
136,302.00
20,445.30
156,747.30
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Paving Blok tebal 6 cm (lokal)
Pasir urug
Kode
L.01
L.02
L.03
L.04
Satua Koefisie
n
n
OH
OH
OH
OH
m2
m3
Harga
Satuan
(Rp)
0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
1.000
0.105
65,000.00
132,400.00
Jumlah
Harga
(Rp)
20,000.00
1,400.00
1,500.00
1,500.00
24,400.00
65,000.00
13,902.00
78,902.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
103,302.00
15,495.30
118,797.30
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Kode
L.01
L.02
L.03
L.04
BAHAN
Paving Blok warna tebal 6 cm
(lokal)
Pasir urug
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
OH
0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
20,000.00
1,400.00
1,500.00
1,500.00
24,400.00
m2
m3
1.000
68,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN
68,000.00
13,902.00
81,902.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
106,302.00
15,945.30
122,247.30
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Batu
Mandor
Kode
L.01
L.02
L.04
BAHAN
Batu kali
Kawat Bronjong 4 mm
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
2.100
50,000.00
0.730
70,000.00
0.052
75,000.00
JUMLAH TENAGA KERJA
105,000.00
51,100.00
3,900.00
160,000.00
m3
kg
1.000
176,200.00
15.000
21,700.00
JUMLAH HARGA BAHAN
176,200.00
325,500.00
501,700.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
661,700.00
99,255.00
760,955.00
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
L.01
L.02
L.03
L.04
BAHAN
Grass Block tebal 6 cm
Pasir urug
OH
OH
OH
OH
0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
20,000.00
1,400.00
1,500.00
1,500.00
24,400.00
m2
m3
1.000 #
#VALUE!
0.105
132,400.00
13,902.00
JUMLAH HARGA BAHAN
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
Satua Koefisie
n
n
L.01
L.02
L.04
BAHAN
Pipa PVC 63 mm
PERALATAN
Tripot/Tackel & handle crane 2 E.64
T
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.081
50,000.00
0.041
70,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
4,050.00
2,870.00
600.00
7,520.00
1.000
29,000.00
JUMLAH HARGA BAHAN
29,000.00
29,000.00
hari
0.006
81,060.00
JUMLAH HARGA ALAT
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
486.36
486.36
37,006.36
5,550.95
42,557.31
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Pipa PVC 90 mm
PERALATAN
Tripot/Tackel & handle crane 2 E.64
T
Jumlah (A+B+C)
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.094
50,000.00
0.047
70,000.00
0.009
75,000.00
JUMLAH TENAGA KERJA
4,700.00
3,290.00
675.00
8,665.00
1.000
60,550.00
JUMLAH HARGA BAHAN
60,550.00
60,550.00
hari
0.008
81,060.00
JUMLAH HARGA ALAT
648.48
648.48
69,863.48
E
F
15% x D
10,479.52
80,343.00
No
A
D
E
F
Uraian
Satua Koefisie
Kode
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
TENAGA
Pekerja
Tukang Pipa
Mandor
L.01
L.02
L.04
OH
OH
OH
0.105
50,000.00
0.053
70,000.00
0.011
75,000.00
JUMLAH TENAGA KERJA
5,250.00
3,710.00
825.00
9,785.00
BAHAN
Pipa PVC 110 mm
E.64
1.000
88,850.00
JUMLAH HARGA BAHAN
88,850.00
88,850.00
hari
0.010
81,060.00
JUMLAH HARGA ALAT
PERALATAN
Tripot/Tackel & handle crane 2
T
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
810.60
810.60
99,445.60
14,916.84
114,362.44
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.04
BAHAN
Pipa PVC 150 mm
PERALATAN
Tripot/Tackel & handle crane 2 E.64
T
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.118
50,000.00
0.059
70,000.00
0.012
75,000.00
JUMLAH TENAGA KERJA
5,900.00
4,130.00
900.00
10,930.00
1.000
190,000.00
JUMLAH HARGA BAHAN
190,000.00
190,000.00
hari
0.012
81,060.00
JUMLAH HARGA ALAT
972.72
972.72
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
201,902.72
30,285.41
232,188.13
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Pipa PVC 200 mm
PERALATAN
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.189
50,000.00
0.095
70,000.00
0.019
75,000.00
JUMLAH TENAGA KERJA
9,450.00
6,650.00
1,425.00
17,525.00
1.000
296,800.00
JUMLAH HARGA BAHAN
296,800.00
296,800.00
hari
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
0.024
81,060.00
JUMLAH HARGA ALAT
1,945.44
1,945.44
316,270.44
47,440.57
363,711.01
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Pipa PVC 250 mm
PERALATAN
Tripot/Tackel & handle crane 2 E.64
T
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.256
50,000.00
0.128
70,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA
12,800.00
8,960.00
1,950.00
23,710.00
1.000
468,200.00
JUMLAH HARGA BAHAN
468,200.00
468,200.00
hari
0.034
81,060.00
JUMLAH HARGA ALAT
2,756.04
2,756.04
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
494,666.04
74,199.91
568,865.95
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Pipa PVC 300 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
0.294
50,000.00
0.147
70,000.00
0.029
75,000.00
JUMLAH TENAGA KERJA
1.000 #
JUMLAH HARGA BAHAN
hari
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
0.040
81,060.00
JUMLAH HARGA ALAT
Jumlah
Harga
(Rp)
14,700.00
10,290.00
2,175.00
27,165.00
#VALUE!
#VALUE!
3,242.40
3,242.40
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
OH
OH
OH
Harga
Satuan
(Rp)
0.544
50,000.00
0.272
70,000.00
0.054
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
27,200.00
19,040.00
4,050.00
50,290.00
D
E
F
BAHAN
Pipa PVC 400 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
hari
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1.000 #
JUMLAH HARGA BAHAN
0.080
81,060.00
JUMLAH HARGA ALAT
#VALUE!
#VALUE!
6,484.80
6,484.80
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Pipa HDPE 63 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.035
50,000.00
0.017
70,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA
1,750.00
1,190.00
225.00
3,165.00
1.000
33,850.00
JUMLAH HARGA BAHAN
33,850.00
33,850.00
hari
0.019
81,060.00
JUMLAH HARGA ALAT
1,540.14
1,540.14
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
38,555.14
5,783.27
44,338.41
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Pipa HDPE 100 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.040
50,000.00
0.020
70,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
2,000.00
1,400.00
300.00
3,700.00
1.000
161,500.00
JUMLAH HARGA BAHAN
161,500.00
161,500.00
hari
0.019
81,060.00
JUMLAH HARGA ALAT
1,540.14
1,540.14
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
166,740.14
25,011.02
191,751.16
15% x D
No
A
Uraian
TENAGA
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
Pekerja
Tukang Pipa
Mandor
B
D
E
F
L.01
L.02
L.04
BAHAN
Pipa HDPE 125 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
OH
OH
OH
0.045
50,000.00
0.023
70,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA
2,250.00
1,610.00
375.00
4,235.00
1.000
207,600.00
JUMLAH HARGA BAHAN
207,600.00
207,600.00
hari
0.019
81,060.00
JUMLAH HARGA ALAT
1,540.14
1,540.14
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
213,375.14
32,006.27
245,381.41
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Pipa HDPE 150 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.062
50,000.00
0.031
70,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
3,100.00
2,170.00
450.00
5,720.00
1.000
207,600.00
JUMLAH HARGA BAHAN
207,600.00
207,600.00
hari
0.019
81,060.00
JUMLAH HARGA ALAT
1,540.14
1,540.14
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
214,860.14
32,229.02
247,089.16
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Pipa HDPE 200 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.102
50,000.00
0.051
70,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA
5,100.00
3,570.00
750.00
9,420.00
1.000
299,000.00
JUMLAH HARGA BAHAN
299,000.00
299,000.00
hari
0.019
81,060.00
JUMLAH HARGA ALAT
1,540.14
1,540.14
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
309,960.14
46,494.02
356,454.16
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Pipa HDPE 250 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.133
50,000.00
0.067
70,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA
6,650.00
4,690.00
975.00
12,315.00
1.000
822,950.00
JUMLAH HARGA BAHAN
822,950.00
822,950.00
hari
0.042
81,060.00
JUMLAH HARGA ALAT
3,404.52
3,404.52
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
838,669.52
125,800.43
964,469.95
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.04
BAHAN
Pipa HDPE 300 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Harga
Satuan
(Rp)
OH
OH
OH
0.170
50,000.00
0.085
70,000.00
0.017
75,000.00
JUMLAH TENAGA KERJA
1.000 #
JUMLAH HARGA BAHAN
hari
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Jumlah
Harga
(Rp)
8,500.00
5,950.00
1,275.00
15,725.00
#VALUE!
#VALUE!
0.065
81,060.00
JUMLAH HARGA ALAT
5,268.90
5,268.90
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
D
E
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Pipa HDPE 400 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Jumlah (A+B+C)
Overhead + Profit 15%
Satua Koefisie
Kode
n
n
L.01
L.02
L.04
Harga
Satuan
(Rp)
OH
OH
OH
0.290
50,000.00
0.145
70,000.00
0.029
75,000.00
JUMLAH TENAGA KERJA
1.000 #
JUMLAH HARGA BAHAN
hari
0.152
81,060.00
JUMLAH HARGA ALAT
15% x D
Jumlah
Harga
(Rp)
14,500.00
10,150.00
2,175.00
26,825.00
#VALUE!
#VALUE!
12,321.12
12,321.12
#VALUE!
#VALUE!
#VALUE!
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
Satua Koefisie
n
n
L.01
L.02
L.04
BAHAN
Pipa GIP 63 mm
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.345
50,000.00
0.172
70,000.00
0.034
75,000.00
JUMLAH TENAGA KERJA
17,250.00
12,040.00
2,550.00
31,840.00
1.000
183,000.00
JUMLAH HARGA BAHAN
183,000.00
183,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
214,840.00
32,226.00
247,066.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
Satua Koefisie
n
n
L.01
L.02
L.04
BAHAN
Pipa GIP 100 mm
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.400
50,000.00
0.200
70,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA
20,000.00
14,000.00
3,000.00
37,000.00
1.000
467,700.00
JUMLAH HARGA BAHAN
467,700.00
467,700.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
504,700.00
75,705.00
580,405.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Pipa GIP 125 mm
PERALATAN
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
0.448
50,000.00
0.224
70,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA
1.000 #
JUMLAH HARGA BAHAN
Jumlah
Harga
(Rp)
22,400.00
15,680.00
3,375.00
41,455.00
#VALUE!
#VALUE!
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
Satua Koefisie
n
n
L.01
L.02
L.04
BAHAN
Pipa GIP 150 mm
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.506
50,000.00
0.253
70,000.00
0.051
75,000.00
JUMLAH TENAGA KERJA
25,300.00
17,710.00
3,825.00
46,835.00
1.000
678,000.00
JUMLAH HARGA BAHAN
678,000.00
678,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
724,835.00
108,725.25
833,560.25
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
Satua Koefisie
n
n
L.01
L.02
L.04
BAHAN
Pipa GIP 200 mm
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.796
50,000.00
0.398
70,000.00
0.080
75,000.00
JUMLAH TENAGA KERJA
39,800.00
27,860.00
6,000.00
73,660.00
1.000
1,032,000.00
JUMLAH HARGA BAHAN
1,032,000.00
1,032,000.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1,105,660.00
165,849.00
1,271,509.00
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
OH
OH
OH
Harga
Satuan
(Rp)
0.949
50,000.00
0.475
70,000.00
0.095
75,000.00
JUMLAH TENAGA KERJA
Jumlah
Harga
(Rp)
47,450.00
33,250.00
7,125.00
87,825.00
1.000 #
JUMLAH HARGA BAHAN
#VALUE!
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
Satua Koefisie
n
n
L.01
L.02
L.04
Harga
Satuan
(Rp)
OH
OH
OH
0.958
50,000.00
0.479
70,000.00
0.096
75,000.00
JUMLAH TENAGA KERJA
1.000 #
JUMLAH HARGA BAHAN
BAHAN
Pipa GIP 300 mm
Jumlah
Harga
(Rp)
47,900.00
33,530.00
7,200.00
88,630.00
#VALUE!
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
1.212
50,000.00
0.606
70,000.00
0.121
75,000.00
JUMLAH TENAGA KERJA
1.000 #
JUMLAH HARGA BAHAN
BAHAN
Pipa GIP 300 mm
Jumlah
Harga
(Rp)
60,600.00
42,420.00
9,075.00
112,095.00
#VALUE!
#VALUE!
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
#VALUE!
#VALUE!
#VALUE!
15% x D
No
Uraian
Kode
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
D
E
F
TENAGA
Pekerja
Tukang Pipa
Mandor
L.01
L.02
L.04
OH
OH
OH
1.429
50,000.00
0.715
70,000.00
0.143
75,000.00
JUMLAH TENAGA KERJA
71,450.00
50,050.00
10,725.00
132,225.00
bh
1.000
3,453,450.00
JUMLAH HARGA BAHAN
3,453,450.00
3,453,450.00
hari
0.100
81,060.00
JUMLAH HARGA ALAT
8,106.00
8,106.00
BAHAN
Valve 150 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
3,593,781.00
539,067.15
4,132,848.15
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
Jumlah
Harga
(Rp)
OH
OH
OH
1.714
50,000.00
0.857
70,000.00
0.171
75,000.00
JUMLAH TENAGA KERJA
85,700.00
59,990.00
12,825.00
158,515.00
bh
1.000
5,512,200.00
JUMLAH HARGA BAHAN
5,512,200.00
5,512,200.00
hari
0.300
81,060.00
JUMLAH HARGA ALAT
24,318.00
24,318.00
BAHAN
Valve 200 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Harga
Satuan
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
5,695,033.00
854,254.95
6,549,287.95
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
Jumlah
Harga
(Rp)
OH
OH
OH
1.714
50,000.00
0.857
70,000.00
0.171
75,000.00
JUMLAH TENAGA KERJA
85,700.00
59,990.00
12,825.00
158,515.00
bh
1.000
8,301,500.00
JUMLAH HARGA BAHAN
8,301,500.00
8,301,500.00
hari
0.400
81,060.00
JUMLAH HARGA ALAT
32,424.00
32,424.00
BAHAN
Valve 250 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Harga
Satuan
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
8,492,439.00
1,273,865.85
9,766,304.85
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
OH
OH
OH
2.000
50,000.00
1.000
70,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA
bh
1.000 #
JUMLAH HARGA BAHAN
BAHAN
Valve 300 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Harga
Satuan
(Rp)
hari
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
0.500
81,060.00
JUMLAH HARGA ALAT
Jumlah
Harga
(Rp)
100,000.00
70,000.00
15,000.00
185,000.00
#VALUE!
#VALUE!
40,530.00
40,530.00
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Valve 300 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
3.429
50,000.00
1.715
70,000.00
0.343
75,000.00
JUMLAH TENAGA KERJA
bh
1.000 #
JUMLAH HARGA BAHAN
hari
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1.000
81,060.00
JUMLAH HARGA ALAT
Jumlah
Harga
(Rp)
171,450.00
120,050.00
25,725.00
317,225.00
#VALUE!
#VALUE!
81,060.00
81,060.00
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Tee 150 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Jumlah (A+B+C)
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.106
50,000.00
0.053
70,000.00
0.011
75,000.00
JUMLAH TENAGA KERJA
5,300.00
3,710.00
825.00
9,835.00
bh
1.000
772,700.00
JUMLAH HARGA BAHAN
772,700.00
772,700.00
hari
0.028
81,060.00
JUMLAH HARGA ALAT
2,269.68
2,269.68
784,804.68
E
F
15% x D
117,720.70
902,525.38
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.04
BAHAN
Tee 200 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.216
50,000.00
0.108
70,000.00
0.022
75,000.00
JUMLAH TENAGA KERJA
10,800.00
7,560.00
1,650.00
20,010.00
bh
1.000
1,783,000.00
JUMLAH HARGA BAHAN
1,783,000.00
1,783,000.00
hari
0.029
81,060.00
JUMLAH HARGA ALAT
2,350.74
2,350.74
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1,805,360.74
270,804.11
2,076,164.85
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Satua Koefisie
Kode
n
n
L.01
L.02
L.04
BAHAN
Tee 250 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
OH
0.326
50,000.00
0.163
70,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
16,300.00
11,410.00
2,475.00
30,185.00
bh
1.000
1,245,200.00
JUMLAH HARGA BAHAN
1,245,200.00
1,245,200.00
hari
0.039
81,060.00
JUMLAH HARGA ALAT
3,161.34
3,161.34
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1,278,546.34
191,781.95
1,470,328.29
15% x D
No
A
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Tee 300 mm
PERALATAN
Kode
L.01
L.02
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
0.436
50,000.00
0.218
70,000.00
0.044
75,000.00
JUMLAH TENAGA KERJA
bh
1.000 #
JUMLAH HARGA BAHAN
Jumlah
Harga
(Rp)
21,800.00
15,260.00
3,300.00
40,360.00
#VALUE!
#VALUE!
hari
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
0.500
81,060.00
JUMLAH HARGA ALAT
40,530.00
40,530.00
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
D
E
F
Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
Kode
L.01
L.02
L.04
BAHAN
Tee 400 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
OH
0.656
50,000.00
0.328
70,000.00
0.066
75,000.00
JUMLAH TENAGA KERJA
bh
1.000 #
JUMLAH HARGA BAHAN
hari
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
0.500
81,060.00
JUMLAH HARGA ALAT
Jumlah
Harga
(Rp)
32,800.00
22,960.00
4,950.00
60,710.00
#VALUE!
#VALUE!
40,530.00
40,530.00
#VALUE!
#VALUE!
#VALUE!
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
Kode
L.01
L.04
BAHAN
Air test (air bersih)
Bahan bakar
Oli
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA
400.00
60.00
460.00
m3
liter
liter
0.002
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN
200.00
552.00
60.00
812.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1,272.00
190.80
1,462.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Kode
L.01
Satua Koefisie
n
n
OH
0.008
Harga
Satuan
(Rp)
50,000.00
Jumlah
Harga
(Rp)
400.00
Mandor
B
L.04
BAHAN
Air test (air bersih)
Bahan bakar
Oli
OH
0.0008
75,000.00
JUMLAH TENAGA KERJA
60.00
460.00
m3
liter
liter
0.004
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN
400.00
552.00
60.00
1,012.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1,472.00
220.80
1,692.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
Kode
L.01
L.04
BAHAN
Air test (air bersih)
Bahan bakar
Oli
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA
400.00
60.00
460.00
m3
liter
liter
0.008
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN
800.00
552.00
60.00
1,412.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
1,872.00
280.80
2,152.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
Air test (air bersih)
Bahan bakar
Oli
Kode
L.01
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
OH
OH
0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA
400.00
60.00
460.00
m3
liter
liter
0.018
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN
1,800.00
552.00
60.00
2,412.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah
Harga
(Rp)
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
2,872.00
430.80
3,302.80
No
A
Uraian
TENAGA
Pekerja
Mandor
Kode
L.01
L.04
BAHAN
Air test (air bersih)
Bahan bakar
Oli
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA
400.00
60.00
460.00
m3
liter
liter
0.031
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN
3,100.00
552.00
60.00
3,712.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
4,172.00
625.80
4,797.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
Kode
L.01
L.04
BAHAN
Air test (air bersih)
Bahan bakar
Oli
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA
400.00
60.00
460.00
m3
liter
liter
0.049
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN
4,900.00
552.00
60.00
5,512.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
5,972.00
895.80
6,867.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
Air test (air bersih)
Bahan bakar
Oli
PERALATAN
Kode
L.01
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA
400.00
60.00
460.00
m3
liter
liter
0.071
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN
7,100.00
552.00
60.00
7,712.00
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
8,172.00
1,225.80
9,397.80
15% x D
No
A
Uraian
TENAGA
Pekerja
Mandor
BAHAN
Air test (air bersih)
Bahan bakar
Oli
Kode
L.01
L.04
Satua Koefisie
n
n
Harga
Satuan
(Rp)
Jumlah
Harga
(Rp)
OH
OH
0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA
400.00
60.00
460.00
m3
liter
liter
0.126
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN
12,600.00
552.00
60.00
13,212.00
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
15% x D
Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya
SUKAHAR, ST, MT
NIP 19601103 198103 1 006
13,672.00
2,050.80
15,722.80
No
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
Satua
n
Harga
Satuan
(Rp.)
m2
m2
m2
m3
m3
m2
257,004.07
168,450.21
59,225.00
412,073.75
386,198.75
#VALUE!
PEKERJAAN TANAH
Penggalian 1 m3 tanah biasa sedalam 1 m
Penggalian 1 m3 tanah biasa sedalam 2 m
Penggalian 1 m3 tanah biasa sedalam 3 m
Penggalian 1 m3 tanah keras sedalam 1 m
Penggalian 1 m3 tanah lumpur sedalam 1 m
Pembuangan 1 m3 tanah sejauh 30 meter
Pembuangan 1 m3 tanah sejauh 100 meter
Pembuangan 1 m3 tanah sejauh 200 meter
Pengurugan kembali 1 m3 galian tanah
Pemadatan tanah 1 m3 tanah ( per 20 cm)
Pengurugan 1 m3 dengan pasir urug
Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan
Pengurugan 1 m3 sirtu
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
45,281.25
55,631.25
66,153.75
60,260.00
72,881.25
19,837.50
36,590.91
57,500.00
16,531.25
33,062.50
200,824.50
285,918.75
186,133.25
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
805,052.90
794,454.50
762,846.98
752,248.58
733,166.75
722,568.35
692,503.78
681,905.38
391,904.82
2,234,146.86
809,754.56
m2
m2
m2
m2
m2
m2
m2
m2
m2
289,317.35
272,776.09
270,034.49
140,026.30
132,846.28
131,228.46
250,551.19
196,625.39
145,231.66
PEKERJAAN PLESTERAN
Pemasangan 1m plesteran 1 PC :3 PP tebal 15 mm
m2
49,513.14
Kode
Uraian Pekerjaan
PEKERJAAN PERSIAPAN
A.2.2.1.2
A.2.2.1.2a.
A.2.2.1.10
A.2.2.1.13
A.2.2.1.14
A.2.2.1.16
A.2.3.1.1
A.2.3.1.2
A.2.3.1.3
A.2.3.1.4
A.2.3.1.6
A.2.3.1.8
A.2.3.1.8a.
A.2.3.1.8b.
A.2.3.1.9
A.2.3.1.10
A.2.3.1.11
A.2.3.1.13
A.2.3.1.14
A.3.2.1.2
A.3.2.1.2a
A.3.2.1.3
A.3.2.1.3a
A.3.2.1.4
A.3.2.1.4a
A.3.2.1.5
A.3.2.1.5a
A.3.2.1.9
A.3.2.1.10
A.3.2.1.11
PEKERJAAN PONDASI
Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP
Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP
A.4.4.1.2
A.4.4.1.4
A.4.4.1.5
A.4.4.1.8
A.4.4.1.10
A.4.4.1.11
A.4.4.1.17
A.4.4.1.19
A.4.4.1.21
A.4.4.2.3
A.4.4.2.5
A.4.4.2.6
A.4.4.2.20
A.4.4.2.20a.
A.4.4.2.23
A.4.4.2.24
A.4.4.2.26
A.4.4.2.27
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
1m
1m
1m
1m
1m
1m
plesteran 1 PC :5 PP tebal 15 mm
plesteran 1 PC :6 PP tebal 15 mm
plesteran skoning 1 SP :3 PP lebar 10 cm
plesteran skoning 1 SP :3 PP lebar 10 mm
plesteran ciprat 1 SP :2 PP
finishing siar pasangan bata merah
Pemasangan 1m acian
m2
m2
m2
m2
m2
m2
m2
m2
45,588.07
44,445.32
43,824.09
11,739.09
36,000.52
21,403.80
45,033.54
26,881.25
PEKERJAAN BETON
A.4.1.1.1
A.4.1.1.2
A.4.1.1.4
A.4.1.1.5
A.4.1.1.7
A.4.1.1.8
A.4.1.1.17
A.4.1.1.17a
A.4.1.1.17b.
A.4.1.1.17c.
A.4.1.1.19
A.4.1.1.20
A.4.1.1.20a.
A.4.1.1.21
A.4.1.1.21a.
A.4.1.1.22
A.4.1.1.22a.
A.4.1.1.22b.
A.4.1.1.22c.
A.4.1.1.23
A.4.1.1.23a.
A.4.1.1.23b.
A.4.1.1.23c.
A.4.1.1.24
A.4.1.1.24a.
A.4.1.1.24b.
A.4.1.1.25
A.4.1.1.25a.
A.4.1.1.25b.
A.4.1.1.25c.
A.4.1.1.26
A.4.1.1.26a.
A.4.1.1.27a.
m3
841,934.21
m3
887,903.94
m3
779,004.13
Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100)
m3
966,789.01
Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (122)cm,
m3 1,038,049.25
Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (122)cm,
m3 1,058,493.20
Membuat 1 m3 Beton mutu f'c=21,7 MPa (K250), slum (122)cm,
Pembesian 10 kg dengan besi polos atau besi ulir
10 kg 123,216.75
Pembesian dengan besi polos atau besi ulir
kg
12,321.68
Pembesian 1 kg dengan besi polos
kg
12,321.68
Pembesian 1 kg dengan besi ulir
kg
12,502.80
Pembesian 10 kg jaring kawat baja (wiremesh)
10 kg #VALUE!
Pemasangan 1 m2 bekisting untuk pondasi
m2
189,331.40
Pemasangan 1 m2 bekisting untuk pondasi (papan kayu lokal)
m2
131,675.00
Pemasangan 1 m2 bekisting untuk sloof
m2
204,985.20
Pemasangan 1 m2 bekisting untuk sloof (2x Pakai)
m2
134,543.10
Pemasangan 1 m2 bekisting untuk kolom
m2
379,437.90
Pemasangan 1 m2 bekisting untuk kolom
m2
208,685.90
Pemasangan 1 m2 bekisting untuk kolom (2x pakai)
m2
146,070.70
m2
172,338.14
Pemasangan 1 m2 bekisting untuk kolom (kolom ekspose t
Pemasangan 1 m2 bekisting untuk balok
m2
321,557.25
Pemasangan 1 m2 bekisting untuk balok
m2
208,685.90
Pemasangan 1 m2 bekisting untuk balok (2x pakai)
m2
157,926.63
m2
198,895.38
Pemasangan 1 m2 bekisting untuk balok (balok gantung ti
Pemasangan 1 m2 bekisting untuk lantai
m2
208,685.90
Pemasangan 1 m2 bekisting untuk lantai (papan cetak kayu pinus) m2
360,862.53
Pemasangan 1 m2 bekisting untuk lantai (papan cetak kayu lokal)
m2
303,206.13
Pemasangan 1 m2 bekisting untuk dinding
m2
338,769.30
Pemasangan 1 m2 bekisting untuk dinding
m2
309,979.05
m2
243,736.75
Pemasangan 1 m2 bekisting untuk dinding 1 sisi (papan cetak kayu
m2
452,369.75
Pemasangan 1 m2 bekisting untuk dinding 2 sisi (papan cetak kayu
Pemasangan 1 m2 bekisting untuk tangga
m2
346,980.30
Pemasangan 1 m2 bekisting untuk tangga
m2
262,854.93
m2
79,535.84
Pemasangan 1 m2 bekisting untuk plat penutup saluran (papan c
Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w
Membuat 1 m3 Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w
m2
m2
m2
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
966,789.01
#VALUE!
#VALUE!
4,927.75
7,963.75
6,445.75
42,854.75
44,045.00
39,617.50
#VALUE!
#VALUE!
#VALUE!
35,018.16
35,018.16
A.4.1.2.19
A.4.1.2.20
A.4.1.2.21
A.4.1.2.22
A.4.1.2.23
A.4.1.2.24
A.4.4.3.9
A.4.4.3.10
A.4.4.3.24
A.4.4.3.25
A.4.4.3.35
A.4.4.3.35a.
A.4.4.3.35b.
A.4.4.3.35c.
A.4.4.3.36
A.4.4.3.39
A.4.4.3.41
A.4.4.3.43
A.4.4.3.44
A.4.4.3.45
A.4.4.3.46
A.4.4.3.51
A.4.4.3.53
A.4.4.3.54
A.4.4.3.54a.
A.4.4.3.58
A.4.4.3.60
A.4.4.3.61
buah
35,018.16
m3 #VALUE!
m3 #VALUE!
titik
39,117.25
titik
99,750.08
titik
57,557.50
m2
m2
m1
m1
m2
m2
m2
m2
m2
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
270,353.50
212,186.34
29,813.64
32,033.71
163,934.23
170,205.18
167,781.18
175,288.18
171,436.83
48,923.76
33,921.95
#VALUE!
53,314.00
#VALUE!
#VALUE!
#VALUE!
189,375.56
185,709.36
186,745.51
252,902.83
206,407.75
#VALUE!
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
15,686,506.0
0
10,952,312.5
0
16,569,464.5
0
16,467,758.5
0
10,786,712.5
0
836,401.90
836,401.90
886,937.50
630,487.50
567,678.64
567,678.64
598,000.00
444,130.00
9,777,990.00
14,927,046.0
0
14,443,816.0
0
9,777,990.00
17,027,998.2
5
16,500,838.2
5
11,410,846.2
5
14,337,556.0
0
13,854,326.0
0
9,188,500.00
389,556.75
190,312.01
149,740.01
143,691.24
PEKERJAAN KAYU
A.4.6.1.1
A.4.6.1.2
A.4.6.1.2a.
A.4.6.1.2b.
A.4.6.1.2c.
A.4.6.1.5
A.4.6.1.5a.
A.4.6.1.5b.
A.4.6.1.5c.
A.4.6.1.6
A.4.6.1.6a.
A.4.6.1.6b.
A.4.6.1.6c.
A.4.6.1.13
A.4.6.1.13a.
A.4.6.1.13b.
A.4.6.1.13c.
A.4.6.1.14a.
A.4.6.1.14b.
A.4.6.1.14c.
A.4.6.1.15a.
A.4.6.1.15b.
A.4.6.1.15c.
A.4.6.1.16
A.4.6.1.16a.
A.4.6.1.16b.
A.4.6.1.16c.
Pemasangan
Pemasangan
Pemasangan
Pemasangan
1
1
1
1
m
m
m
m
Konstruksi
Konstruksi
Konstruksi
Konstruksi
A.4.6.1.16d.
A.4.6.1.16e.
A.4.6.1.16f.
A.4.6.1.17
A.4.6.1.17a.
A.4.6.1.17b.
A.4.6.1.17c.
A.4.6.1.19a.
A.4.6.1.19b.
A.4.6.1.20
A.4.6.1.20a.
A.4.6.1.20b.
A.4.6.1.21
A.4.6.1.21a.
A.4.6.1.21b.
A.4.6.1.23
A.4.6.1.23a.
A.4.6.1.23b.
A.4.2.1.1
A.4.2.1.1a.
A.4.2.1.1b.
A.4.2.1.2
A.4.2.1.2a.
A.4.2.1.3
A.4.2.1.3a.
A.4.2.1.4
A.4.2.1.5
A.4.2.1.5a.
A.4.2.1.7
A.4.2.1.8
A.4.2.1.10
A.4.2.1.11
A.4.2.1.11a.
A.4.2.1.11b.
A.4.2.1.12
A.4.2.1.13
A.4.2.1.18
A.4.2.1.18a.
A.4.2.1.18b.
A.4.2.1.20
A.4.2.1.21
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m2
m2
163,767.88
113,615.40
104,033.11
536,751.00
190,312.01
149,740.01
143,691.24
129,923.55
123,269.90
133,168.85
133,168.85
126,126.35
176,865.08
126,632.80
85,701.45
257,134.25
#VALUE!
#VALUE!
Kg
Kg
Kg
Kg
Kg
100 Kg
Kg
m2
10 cm
cm
m2
m2
m2
m1
m1
m1
m2
m2
m1
m1
m1
m2
m2
22,082.88
23,745.78
23,944.15
24,265.00
25,927.90
51,277.84
512.78
#VALUE!
27,481.70
2,748.17
#VALUE!
#VALUE!
438,437.50
135,585.00
135,585.00
#VALUE!
#VALUE!
#VALUE!
221,311.18
221,311.18
208,201.18
115,460.00
141,651.25
PEKERJAAN PLAFOND
A.4.5.1.1
A.4.5.1.1a.
A.4.5.1.4
A.4.5.1.5
A.4.5.1.6
A.4.5.1.7
A.4.5.1.8
A.4.5.1.9
A.4.5.2.1
A.4.5.2.1a.
A.4.5.2.1b.
A.4.5.2.2
m2
m2
m2
m2
m2
m2
m2
m1
31,941.25
27,893.25
268,231.75
52,310.63
307,735.40
37,277.94
415,283.40
13,374.50
PEKERJAAN
Pemasangan
Pemasangan
Pemasangan
Pemasangan
m1
m1
m1
m2
77,811.88
84,999.38
92,186.88
112,355.00
ATAP
Atap 1 m2
Atap 1 m2
Atap 1 m2
1 m2 Atap
Genteng
Genteng
Genteng
Genteng
Plentong Kecil
Press Jatiwangi
Press Kebumen
Kodok Glasur
A.4.5.2.3
A.4.5.2.4
A.4.5.2.4a.
A.4.5.2.4b.
A.4.5.2.5
A.4.5.2.6
A.4.5.2.8
A.4.5.2.9
A.4.5.2.10
A.4.5.2.11
A.4.5.2.12
A.4.5.2.14
A.4.5.2.30
A.4.5.2.32
A.4.5.2.33
A.4.5.2.34
A.4.5.2.36
A.4.5.2.37
A.4.5.2.38
A.4.5.2.39
A.4.5.2.40
A.4.5.2.41
A.4.5.2.42
A.4.7.1.1
A.4.7.1.3
A.4.7.1.4
A.4.7.1.4a.
A.4.7.1.7
A.4.7.1.9
A.4.7.1.10
A.4.7.1.10a.
A.4.7.1.11
A.4.7.1.16
A.4.7.1.20
A.4.6.2.2
A.4.6.2.3
A.4.6.2.4
A.4.6.2.5
A.4.6.2.6
A.4.6.2.9
A.4.6.2.10
A.4.6.2.12
A.4.6.2.13
A.4.6.2.14
A.4.6.2.16
A.4.6.2.17
A.4.6.2.17a.
A.4.6.2.19
A.4.6.2.20
A.4.6.2.23
A.5.1.1.1
A.5.1.1.2
A.5.1.1.4
x
x
x
x
x
x
PEKERJAAN PENGECATAN
Pengikisan/pengerokan 1 m2 permukaan cat lama
Pengerokan 1 m2 karat pada permukaan baja cara manual
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis
5
5
5
5
4
4
mm
mm
mm
mm
mm
mm
m2
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m1
m2
m1
m2
61,582.50
83,622.94
88,567.94
88,510.44
86,497.94
82,242.94
74,148.93
78,480.60
70,171.85
71,106.23
51,852.35
42,437.30
76,951.10
81,126.75
85,140.25
92,868.94
#VALUE!
52,342.25
48,416.15
31,339.80
#VALUE!
#VALUE!
#VALUE!
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
9,803.75
9,861.25
41,018.20
32,522.00
45,641.43
31,205.25
19,195.23
26,159.63
13,685.00
22,064.48
117,047.00
buah 136,418.75
buah #VALUE!
buah 109,048.75
buah
35,575.25
buah
26,780.63
buah
21,246.25
buah 271,946.25
buah 182,131.25
buah
29,353.75
buah #VALUE!
m2
90,976.50
m2
136,516.50
m2
135,740.25
m2
401,887.63
m2
215,803.25
m2
398,302.50
PEKERJAAN
Pemasangan
Pemasangan
Pemasangan
buah
buah
buah
SANITASI GEDUNG
1 buah closet duduk/monoblock
1 buah closet jongkok porslen
1 buah urinoir
748,502.80
374,937.95
686,357.95
A.5.1.1.5
A.5.1.1.5a.
A.5.1.1.10
A.5.1.1.18
A.5.1.1.19a.
A.5.1.1.19b.
A.5.1.1.20
A.5.1.1.21
A.5.1.1.22
A.5.1.1.23
A.5.1.1.24
A.5.1.1.25
A.5.1.1.26
A.5.1.1.27
A.5.1.1.28
A.5.1.1.29
A.5.1.1.30
A.5.1.1.31
A.5.1.1.32
BOW.M.15
BOW.M.15a
BOW.M.15b
BOW.M.15c
BOW.M.15d
BOW.M.15e
BOW.M.15f
BOW.G.5b
ANALISA LAINNYA
1 m2 Pasang paving Natural tebal 6 cm K 175
1 m2 Pasang paving warna tebal 6 cm K 175
1 m2 Pasang paving Natural tebal 8 cm K 175
1 m2 Pasang paving warna tebal 8 cm K 175
1 m2 Pasang paving Natural tebal 6 cm (Lokal)
1 m2 Pasang paving warna tebal 6 cm (Lokal)
1 m2 pasang Grass Block tebal 6 cm K 175
1 m3 Pasang Bronjong Kawat 4 mm
m2
m2
m2
m2
m2
m2
m2
m3
130,297.30
141,797.30
147,547.30
156,747.30
118,797.30
122,247.30
#VALUE!
760,955.00
A.8.4.1.1
A.8.4.1.2
A.8.4.1.3
A.8.4.1.4
A.8.4.1.5
A.8.4.1.6
A.8.4.1.7
A.8.4.1.8
A.8.4.1.17
A.8.4.1.18
A.8.4.1.19
A.8.4.1.20
A.8.4.1.21
A.8.4.1.22
A.8.4.1.23
A.8.4.1.24
A.8.4.1.33
A.8.4.1.34
A.8.4.1.35
A.8.4.1.36
A.8.4.1.37
A.8.4.1.38
A.8.4.1.39
A.8.4.1.40
PEKERJAAN
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
42,557.31
80,343.00
114,362.44
232,188.13
363,711.01
568,865.95
#VALUE!
#VALUE!
44,338.41
191,751.16
245,381.41
247,089.16
356,454.16
964,469.95
#VALUE!
#VALUE!
247,066.00
580,405.00
#VALUE!
833,560.25
1,271,509.00
#VALUE!
#VALUE!
#VALUE!
m1
m1
4,132,848.15
6,549,287.95
A.8.4.3.1
A.8.4.3.2
PIPA
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
PVC 63 mm
PVC 90 mm
PVC 110 mm
PVC 150 mm
PVC 200 mm
PVC 250 mm
PVC 300 mm
PVC 400 mm
HDPE 63 mm
HDPE 100 mm
HDPE 125 mm
HDPE 150 mm
HDPE 200 mm
HDPE 250 mm
HDPE 300 mm
HDPE 400 mm
GIP 63 mm
GIP 100 mm
GIP 125 mm
GIP 150 mm
GIP 200 mm
GIP 250 mm
GIP 300 mm
GIP 400 mm
buah #VALUE!
buah 505,807.95
buah #VALUE!
m1
67,999.50
m1
31,395.66
m1
31,740.66
m1
89,746.00
m1
111,670.75
m1
142,824.25
m1
390,666.50
m1
533,712.13
m1
26,662.75
m1
30,406.00
m1
38,427.25
m1
52,917.25
m1
48,817.50
m1
67,122.63
m1
89,582.13
m1
131,649.13
A.8.4.3.3
A.8.4.3.4
A.8.4.3.5
A.8.4.3.15
A.8.4.3.16
A.8.4.3.17
A.8.4.3.18
A.8.4.3.19
A.8.4.5.1
A.8.4.5.2
A.8.4.5.3
A.8.4.5.4
A.8.4.5.5
A.8.4.5.6
A.8.4.5.7
A.8.4.5.8
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
1
1
1
1
1
1
1
1
buah
buah
buah
buah
buah
buah
buah
buah
Valve 250 mm
Valve 300 mm
Valve 400 mm
Tee 150 mm
Tee 200 mm
Tee 250 mm
Tee 300 mm
Tee 400 mm
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
9,766,304.85
#VALUE!
#VALUE!
902,525.38
2,076,164.85
1,470,328.29
#VALUE!
#VALUE!
1,462.80
1,692.80
2,152.80
3,302.80
4,797.80
6,867.80
9,397.80
15,722.80
PEKERJAAN JALAN
K. 637a
K. 618a
K. 615a
K. 617a
K. 516
K. 210
K. 621b
K. T04
M3
M2
M2
M2
M3
M2
M2
M2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya
SUKAHAR, ST, MT
NIP 19601103 198103 1 006
URAIAN PEKERJAAN
: XXXXX
: XXXXXXXXXXX
: XXXXXXXXXXXXX
: 2015
ANALISA
PEKERJAAN PERSIAPAN
Pas. Papan Nama Kegiatan
Pembersihan Lapangan
Pengukuran + pas. patok/pro
PEKERJAAN A
AAA1
AAA2
AAA3
AAA4
AAA5
AAA6
AAA7
AAA8
AAA9
AAA10
AAA11
AAA12
AAA13
AAA14
AAA15
AAA16
AAA17
AAA18
AAA19
AAA20
PEKERJAAN B
BBB1
BBB2
BBB3
BBB4
BBB5
BBB6
BBB7
BBB8
BBB9
BBB10
BBB11
BBB12
BBB13
BBB14
BBB15
BBB16
BBB17
BBB18
BBB19
BBB20
PEKERJAAN C
VOLUME
Ls
Ls
Ls
X1
X2
X3
HARGA
SATUAN
(Rp)
JUMLAH
HARGA (Rp)
JUMLAH
TOTAL (Rp)
AA1
AA2
AA3
AA4
AA5
AA6
AA7
AA8
AA9
AA10
AA11
AA12
AA13
AA14
AA15
AA16
AA17
AA18
AA19
AA20
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13
A14
A15
A16
A17
A18
A19
A20
BB1
BB2
BB3
BB4
BB5
BB6
BB7
BB8
BB9
BB10
BB11
BB12
BB13
BB14
BB15
BB16
BB17
BB18
BB19
BB20
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12
B13
B14
B15
B16
B17
B18
B19
B20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
CCC1
CCC2
CCC3
CCC4
CCC5
CCC6
CCC7
CCC8
CCC9
CCC10
CCC11
CCC12
CCC13
CCC14
CCC15
CCC16
CCC17
CCC18
CCC19
CCC20
PEKERJAAN D
DDD1
DDD2
DDD3
DDD4
DDD5
DDD6
DDD7
DDD8
DDD9
DDD10
DDD11
DDD12
DDD13
DDD14
DDD15
DDD16
DDD17
DDD18
DDD19
DDD20
PEKERJAAN E
EEE1
EEE2
EEE3
EEE4
EEE5
EEE6
EEE7
EEE8
EEE9
EEE10
EEE11
EEE12
EEE13
EEE14
EEE15
EEE16
EEE17
CC1
CC2
CC3
CC4
CC5
CC6
CC7
CC8
CC9
CC10
CC11
CC12
CC13
CC14
CC15
CC16
CC17
CC18
CC19
CC20
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20
DD1
DD2
DD3
DD4
DD5
DD6
DD7
DD8
DD9
DD10
DD11
DD12
DD13
DD14
DD15
DD16
DD17
DD18
DD19
DD20
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
EE1
EE2
EE3
EE4
EE5
EE6
EE7
EE8
EE9
EE10
EE11
EE12
EE13
EE14
EE15
EE16
EE17
E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12
E13
E14
E15
E16
E17
18 EEE18
19 EEE19
20 EEE20
VII PEKERJAAN F
1 FFF1
2 FFF2
3 FFF3
4 FFF4
5 FFF5
6 FFF6
7 FFF7
8 FFF8
9 FFF9
10 FFF10
11 FFF11
12 FFF12
13 FFF13
14 FFF14
15 FFF15
16 FFF16
17 FFF17
18 FFF18
19 FFF19
20 FFF20
BOUWSOME
PPn 10%
AANIMINGSOME
JUMLAH DIBULATKAN
TERBILANG
EE18
EE19
EE20
E18
E19
E20
FF1
FF2
FF3
FF4
FF5
FF6
FF7
FF8
FF9
FF10
FF11
FF12
FF13
FF14
FF15
FF16
FF17
FF18
FF19
FF20
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19
F20
#
Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya
SUKAHAR, ST, MT
NIP 19601103 198103 1 006
REKAPITULASI PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA
N
O
: XXXXX
: XXXXXXXXXXX
: XXXXXXXXXXXXX
: 2015
URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN A
III PEKERJAAN B
IV PEKERJAAN C
V PEKERJAAN D
VI PEKERJAAN E
VII PEKERJAAN F
BOUWSOME
PPn 10%
AANIMINGSOME
JUMLAH DIBULATKAN
TERBILANG
#
Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya
SUKAHAR, ST, MT
NIP 19601103 198103 1 006
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
PEKERJAAN A
VOLUME
SAT
- A1
- A2
- A3
- A4
- A5
- A6
- A7
- A8
- A9
- A10
- A11
- A12
- A13
- A14
- A15
- A16
- A17
- A18
- A19
- A20
PERHITUNGAN VOLUME PEKERJAAN
AAA1
ITEM PEKERJAAN
AAA1
AAA2
AAA3
AAA4
AAA5
AAA6
AAA7
AAA8
AAA9
AAA10
AAA11
AAA12
AAA13
AAA14
AAA15
AAA16
AAA17
AAA18
AAA19
AAA20
URAIAN
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A1
JUMLAH
AAA2
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A2
JUMLAH
AAA3
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A3
JUMLAH
AAA4
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A4
JUMLAH
AAA5
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A5
JUMLAH
AAA6
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A6
JUMLAH
AAA7
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A7
JUMLAH
AAA8
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A8
JUMLAH
AAA9
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A9
JUMLAH
AAA10
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A10
JUMLAH
AAA11
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A11
JUMLAH
AAA12
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A12
JUMLAH
AAA13
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A13
JUMLAH
AAA14
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A14
JUMLAH
AAA15
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A15
JUMLAH
AAA16
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A16
JUMLAH
AAA17
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A17
JUMLAH
AAA18
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A18
JUMLAH
JUMLAH
VOLUME
AAA19
URAIAN
PANJANG
LEBAR
TINGGI
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A19
JUMLAH
AAA20
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
A20
JUMLAH
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
PEKERJAAN B
VOLUME
SAT
- B1
- B2
- B3
- B4
- B5
- B6
- B7
- B8
- B9
- B10
- B11
- B12
- B13
- B14
- B15
- B16
- B17
- B18
- B19
- B20
PERHITUNGAN VOLUME PEKERJAAN
BBB1
ITEM PEKERJAAN
BBB1
BBB2
BBB3
BBB4
BBB5
BBB6
BBB7
BBB8
BBB9
BBB10
BBB11
BBB12
BBB13
BBB14
BBB15
BBB16
BBB17
BBB18
BBB19
BBB20
URAIAN
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B1
JUMLAH
BBB2
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B2
JUMLAH
BBB3
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B3
JUMLAH
BBB4
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B4
JUMLAH
BBB5
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B5
JUMLAH
BBB6
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B6
JUMLAH
BBB7
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B7
JUMLAH
BBB8
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B8
JUMLAH
BBB9
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B9
JUMLAH
BBB10
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B10
JUMLAH
BBB11
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B11
JUMLAH
BBB12
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B12
JUMLAH
BBB13
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B13
JUMLAH
BBB14
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B14
JUMLAH
BBB15
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B15
JUMLAH
BBB16
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B16
JUMLAH
BBB17
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B17
JUMLAH
BBB18
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B18
JUMLAH
JUMLAH
VOLUME
BBB19
URAIAN
PANJANG
LEBAR
TINGGI
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B19
JUMLAH
BBB20
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
B20
JUMLAH
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
PEKERJAAN C
VOLUME
SAT
- C1
- C2
- C3
- C4
- C5
- C6
- C7
- C8
- C9
- C10
- C11
- C12
- C13
- C14
- C15
- C16
- C17
- C18
- C19
- C20
PERHITUNGAN VOLUME PEKERJAAN
CCC1
ITEM PEKERJAAN
CCC1
CCC2
CCC3
CCC4
CCC5
CCC6
CCC7
CCC8
CCC9
CCC10
CCC11
CCC12
CCC13
CCC14
CCC15
CCC16
CCC17
CCC18
CCC19
CCC20
URAIAN
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C1
JUMLAH
CCC2
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C2
JUMLAH
CCC3
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C3
JUMLAH
CCC4
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C4
JUMLAH
CCC5
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C5
JUMLAH
CCC6
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C6
JUMLAH
CCC7
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C7
JUMLAH
CCC8
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C8
JUMLAH
CCC9
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C9
JUMLAH
CCC10
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C10
JUMLAH
CCC11
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C11
JUMLAH
CCC12
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C12
JUMLAH
CCC13
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C13
JUMLAH
CCC14
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C14
JUMLAH
CCC15
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C15
JUMLAH
CCC16
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C16
JUMLAH
CCC17
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C17
JUMLAH
CCC18
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C18
JUMLAH
JUMLAH
VOLUME
CCC19
URAIAN
PANJANG
LEBAR
TINGGI
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C19
JUMLAH
CCC20
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
C20
JUMLAH
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
PEKERJAAN D
VOLUME
SAT
- D1
- D2
- D3
- D4
- D5
- D6
- D7
- D8
- D9
- D10
- D11
- D12
- D13
- D14
- D15
- D16
- D17
- D18
- D19
- D20
PERHITUNGAN VOLUME PEKERJAAN
DDD1
ITEM PEKERJAAN
DDD1
DDD2
DDD3
DDD4
DDD5
DDD6
DDD7
DDD8
DDD9
DDD10
DDD11
DDD12
DDD13
DDD14
DDD15
DDD16
DDD17
DDD18
DDD19
DDD20
URAIAN
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D1
JUMLAH
DDD2
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D2
JUMLAH
DDD3
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D3
JUMLAH
DDD4
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D4
JUMLAH
DDD5
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D5
JUMLAH
DDD6
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D6
JUMLAH
DDD7
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D7
JUMLAH
DDD8
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D8
JUMLAH
DDD9
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D9
JUMLAH
DDD10
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D10
JUMLAH
DDD11
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D11
JUMLAH
DDD12
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D12
JUMLAH
DDD13
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D13
JUMLAH
DDD14
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D14
JUMLAH
DDD15
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D15
JUMLAH
DDD16
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D16
JUMLAH
DDD17
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D17
JUMLAH
DDD18
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D18
JUMLAH
JUMLAH
VOLUME
DDD19
URAIAN
PANJANG
LEBAR
TINGGI
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D19
JUMLAH
DDD20
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
D20
JUMLAH
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
PEKERJAAN E
VOLUME
SAT
- E1
- E2
- E3
- E4
- E5
- E6
- E7
- E8
- E9
- E10
- E11
- E12
- E13
- E14
- E15
- E16
- E17
- E18
- E19
- E20
PERHITUNGAN VOLUME PEKERJAAN
EEE1
ITEM PEKERJAAN
EEE1
EEE2
EEE3
EEE4
EEE5
EEE6
EEE7
EEE8
EEE9
EEE10
EEE11
EEE12
EEE13
EEE14
EEE15
EEE16
EEE17
EEE18
EEE19
EEE20
URAIAN
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E1
JUMLAH
EEE2
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E2
JUMLAH
EEE3
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E3
JUMLAH
EEE4
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E4
JUMLAH
EEE5
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E5
JUMLAH
EEE6
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E6
JUMLAH
EEE7
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E7
JUMLAH
EEE8
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E8
JUMLAH
EEE9
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E9
JUMLAH
EEE10
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E10
JUMLAH
EEE11
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E11
JUMLAH
EEE12
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E12
JUMLAH
EEE13
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E13
JUMLAH
EEE14
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E14
JUMLAH
EEE15
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E15
JUMLAH
EEE16
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E16
JUMLAH
EEE17
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E17
JUMLAH
EEE18
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E18
JUMLAH
JUMLAH
VOLUME
EEE19
URAIAN
PANJANG
LEBAR
TINGGI
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E19
JUMLAH
EEE20
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
E20
JUMLAH
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
:
:
:
:
XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
PEKERJAAN F
VOLUME
SAT
- F1
- F2
- F3
- F4
- F5
- F6
- F7
- F8
- F9
- F10
- F11
- F12
- F13
- F14
- F15
- F16
- F17
- F18
- F19
- F20
PERHITUNGAN VOLUME PEKERJAAN
FFF1
ITEM PEKERJAAN
FFF1
FFF2
FFF3
FFF4
FFF5
FFF6
FFF7
FFF8
FFF9
FFF10
FFF11
FFF12
FFF13
FFF14
FFF15
FFF16
FFF17
FFF18
FFF19
FFF20
URAIAN
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F1
JUMLAH
FFF2
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F2
JUMLAH
FFF3
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F3
JUMLAH
FFF4
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F4
JUMLAH
FFF5
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F5
JUMLAH
FFF6
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F6
JUMLAH
FFF7
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F7
JUMLAH
FFF8
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F8
JUMLAH
FFF9
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F9
JUMLAH
FFF10
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F10
JUMLAH
FFF11
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F11
JUMLAH
FFF12
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F12
JUMLAH
FFF13
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F13
JUMLAH
FFF14
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F14
JUMLAH
FFF15
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F15
JUMLAH
FFF16
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F16
JUMLAH
FFF17
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F17
JUMLAH
FFF18
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F18
JUMLAH
JUMLAH
VOLUME
FFF19
URAIAN
PANJANG
LEBAR
TINGGI
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F19
JUMLAH
FFF20
URAIAN
PANJANG
LEBAR
TINGGI
JUMLAH
VOLUME
m1
m1
m1
bh
F20
JUMLAH