1 CA1
Isolator tumpu ( line post) 20 KV
Spool Isolator ansi 53-2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Bolt single Upset 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
2 CA1'

Isolator tumpu ( line post) 20 KV


Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA2-1
Isolator tumpu ( line post) 20 KV
Spool Isolator ansi 53-2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA2
Isolator tumpu ( line post) 20 KV
Spool Isolator ansi 53-2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10 "
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA2'
Isolator tumpu ( line post) 20 KV
Center Bracket 12,5 KN
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA3
Isolator Tarik 20 KV ( 2 pcs )
Spool Isolator ansi 53-2
Oval eye bolt 5/8" x 10"
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Primary Angle Clamp 35 s/d 70 mm2
Shackle Anchor 5/8
Armour Rod # for AAAC 70 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CA3'
Isolator Tarik 20 KV ( 2 pcs )

:
:
:
#REF!

Satuan
Unit
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
mtr
Unit
Unit
bh

Volume
1
1
1
1
2
1
3
2.6
1
1
1
1
2
2
1.8
1
1
2
1
2
3
1
2.8
1
1
2
1
2
3
1
2.8
1
1
2
2
2
2
1
1
1
1
1
1
1
2
1
1
1
1
0.8
1
1
1

Harga Satuan Jumlah Harga


Rp

Rp

215,600
36,050
79,900
19,050
30,200
3,200
6,600
22,400

215,600
36,050
79,900
38,100
30,200
9,600
17,160
22,400

215,600
79,900
19,050
3,200
6,600
21,296

215,600
79,900
38,100
6,400
11,880
21,296

215,600
36,050
79,900
19,050
18,540
6,600
35,342

431,200
36,050
159,800
57,150
18,540
18,480
35,342

36,050
36,050
79,900
19,050
18,540
6,600
44,922

72,100
36,050
159,800
57,150
18,540
18,480
44,922

215,600
79,900
4,000
6,600
43,364

431,200
159,800
8,000
13,200
43,364

245,200
36,050
16,750
29,500
19,096
3,200
19,050
56,650
18,000
60,500
6,600
58,232

245,200
36,050
16,750
29,500
19,096
6,400
19,050
56,650
18,000
60,500
5,280
58,232

245,200

245,200

Hal. 2
No

Uraian pekerjaan
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Angle Clamp 35 s/d 70 mm2
Armour Rod # for AAAC 240 mm2
Upah Pemasangan

Satuan
bh
bh
bh
bh
set
Unit

Volume
1
1
1
1
1
1

Harga Satuan Jumlah Harga


Rp
45,700
19,096
18,000
56,650
121,250
43,364

Rp
45,700
19,096
18,000
56,650
121,250
43,364

Hal. 3
No

Uraian pekerjaan

8 CA4
Isolator Tarik 20 KV ( 2 pcs )
Spool Isolator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval eye bolt 5/8" x 10"
Oval eye nut 5/8"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
9 CA4'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
10 CA5
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Spool Isolator Ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
11 CA5'
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
12 CA5-1
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator Ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
13 CA5-1'
Isolator Tarik 20 KV ( 2 pcs )
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh

Volume
1
2
2
2
2
2
2
2
4
2
2
2
2
1
1
2
1
1
2
2
2
2
2
1
1
1
1
2
1
1
1
1
1
1
1
2
1
1
1
1
2
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
2
1
1
1
1
2
1
1

Harga Satuan Jumlah Harga


Rp

Rp

245,200
41,200
19,050
29,500
16,750
19,096
3,200
37,000
60,500
18,000
67,300
25,770
46,358

490,400
82,400
38,100
59,000
33,500
38,192
6,400
148,000
121,000
36,000
134,600
51,540
46,358

245,200
29,500
19,096
16,750
3,200
37,000
18,000
67,300
55,343

490,400
29,500
19,096
33,500
6,400
74,000
36,000
134,600
55,343

245,200
16,750
3,200
41,200
19,050
29,500
19,096
60,500
18,000
67,300
25,770
29,948

245,200
16,750
6,400
41,200
19,050
29,500
19,096
60,500
18,000
67,300
51,540
29,948

245,200
16,750
3,200
18,000
67,300
55,343

245,200
16,750
6,400
18,000
67,300
55,343

245,200
41,200
19,050
29,500
16,750
3,200
19,096
60,500
37,000
18,000
67,300
25,770
29,948

245,200
41,200
19,050
29,500
16,750
6,400
19,096
60,500
74,000
18,000
67,300
51,540
29,948

245,200
16,750
3,200
37,000
18,000

245,200
16,750
6,400
37,000
18,000

Hal. 4
No

Uraian pekerjaan
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan

Satuan
bh
Unit

Volume
1
1

Harga Satuan Jumlah Harga


Rp
67,300
26,114

Rp
67,300
26,114

Hal. 5
No

Uraian pekerjaan

14 CA6
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator Ansi 53-4
Clevis Swinging Secondary
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Armour Rod # for AAAC 70 mm2
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Upah Pemasangan
15 CA6'

16

17

18

19

20

21

22

Isolator Tarik 20 KV ( 2 pcs )


Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Upah Pemasangan
SE 1-2 ( 7 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
E 1-2 ( 7 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
SE 1-2 ( 9 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
E 1-2 ( 9 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
SE 1-2 ( 11 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
E 1-2 ( 11 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
SE 1-2 ( 12 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp
Guy Wire 22 mm2
Guy Attachment / Guy hok

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh

Volume
1
2
2
2
2
2
2
4
2
2
4
1
1
2
1
2
2
1
2
1
1
1
2
7
1
1
1
1
2
1
7
1
1
1
1
2
9
1
1
1
1
2
1
9
1
1
1
1
2
11
1
1
1
1
2
1
11
1
1
1
1
2
12
1

Harga Satuan Jumlah Harga


Rp

Rp

245,200
41,200
19,050
19,096
18,000
67,300
25,770
60,500
16,750
3,200
56,674

490,400
82,400
38,100
38,192
36,000
134,600
103,080
121,000
33,500
12,800
56,674

245,200
19,096
18,000
67,300
16,750
3,200
54,571

490,400
19,096
36,000
134,600
16,750
6,400
54,571

45,700
38,100
8,450
12,800
27,190

45,700
76,200
59,150
12,800
27,190

19,050
38,100
3,200
8,450
12,800
27,190

19,050
76,200
3,200
59,150
12,800
27,190

45,700
38,100
8,450
12,800
27,190

45,700
76,200
76,050
12,800
27,190

19,050
38,100
3,200
8,450
12,800
27,190

19,050
76,200
3,200
76,050
12,800
27,190

45,700
38,100
8,450
12,800
27,190

45,700
76,200
92,950
12,800
27,190

19,050
38,100
3,200
8,450
12,800
27,190

19,050
76,200
3,200
92,950
12,800
27,190

45,700
38,100
8,450
12,800

45,700
76,200
101,400
12,800

Hal. 6
No

Uraian pekerjaan
Upah Pemasangan

Satuan
Unit

Volume
1

Harga Satuan Jumlah Harga


Rp
27,190

Rp
27,190

Hal. 7
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

23 E 1-2 ( 12 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 22 mm2
Guy Attachment / Guy hok
Upah Pemasangan
24 SE 1-2 ( 7 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
25 E 1-2 ( 7 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
26 SE 1-2 ( 9 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
27 E 1-2 ( 9 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
28 SE 1-2 ( 11 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
29 E 1-2 ( 11 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 35 mm2
Guy Attachment / Guy hok
Upah Pemasangan
30 SE 1-2 ( 12 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
31 E 1-2 ( 12 M )
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
32 SE1-3 (11 M)

Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit

1
1
2
1
12
1
1
1
1
2
1
7
1
1
1
1
2
1
7
1
1
1
1
2
1
9
1
1
1
1
2
1
9
1
1
1
1
2
1
11
1
1
1
1
2
1
11
1
1
1
1
2
1
12
1
1
1
1
2
1
12
1
1
1

Rp

19,050
38,100
3,200
8,450
12,800
27,190

19,050
76,200
3,200
101,400
12,800
27,190

45,700
38,100
3,200
12,400
12,800
27,190

45,700
76,200
3,200
86,800
12,800
27,190

19,050
38,100
3,200
12,400
12,800
27,190

19,050
76,200
3,200
86,800
12,800
27,190

45,700
38,100
3,200
12,400
12,800
27,190

45,700
76,200
3,200
111,600
12,800
27,190

19,050
38,100
3,200
12,400
12,800
27,190

19,050
76,200
3,200
111,600
12,800
27,190

45,700
38,100
3,200
12,400
12,800
27,190

45,700
76,200
3,200
136,400
12,800
27,190

19,050
38,100
3,200
12,400
12,800
27,190

19,050
76,200
3,200
136,400
12,800
27,190

45,700
38,100
3,200
22,500
12,800
27,190

45,700
76,200
3,200
270,000
12,800
27,190

19,050
38,100
3,200
22,500
12,800
27,190

19,050
76,200
3,200
270,000
12,800
27,190

Hal. 8
No

Uraian pekerjaan
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan

Satuan
bh
bh
bh
mtr
bh
Unit

Volume
1
2
1
11
1
1

Harga Satuan Jumlah Harga


Rp
45,700
38,100
3,200
22,500
12,800
27,190

Rp
45,700
76,200
3,200
247,500
12,800
27,190

Hal. 9
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

33 E1-3(11 M)
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
34 SE1-3 (12 M)
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
35 E1-3 (12 M)
Bolt Machine 5/8" x 10 "
Three Bolt Clamp (Guy Grip)
Washer Square 2 1/4 "
Guy Wire 70 mm2
Guy Attachment / Guy hok
Upah Pemasangan
36 SE2-2
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Guy Wire 35 mm2
Nut thimble eye 5/8"
Upah Pemasangan
37 SE2-3
Pole Band Double Rack 7" atau 7 1/2"
Three Bolt Clamp (Guy Grip)
Guy Wire 70 mm2
Nut thimble eye 5/8"
Upah Pemasangan
38 E2-3
Bolt Machine 5/8" x (14" s/d 22")
Three Bolt Clamp (Guy Grip)
Guy Wire 70 mm2
Nut thimble eye 5/8"
Upah Pemasangan
39 F 1-2
Rod Anchor 5/8" x 7
Expanding Anchor 8.000 lbs
Upah Pemasangan
40 F 1-3
Rod Anchor 5/8" x 7
Expanding Anchor 10.000 lbs
Upah Pemasangan
41 J5-T (CJ2)
Suspension / small angle assembly (CJ5-T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping
Upah Pemasangan
42 J7 - T (CJ3)
Large angle assembly (CJ7 - T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping
Upah Pemasangan
43 J6 - T (CJ4)
Dead End Assembly (CJ6 - T)
Stainless Stell Strap 20 x 0,7 mm2
Stoping Buckel / Yokes
Plastic Strap For Clamping

Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
Unit
Unit
bh
bh
Unit
Unit
bh
mtr
bh
bh
Unit
Unit
bh
mtr
bh
bh
Unit
Unit
bh
mtr
bh
bh

1
1
2
1
11
1
1
1
1
2
1
12
1
1
1
1
2
1
12
1
1
1
1
2
20
2
1
1
2
2
20
2
1
1
1
2
20
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Rp

19,050
3,200
22,500
12,800
27,190

0
38,100
3,200
247,500
12,800
27,190

45,700
38,100
3,200
22,500
12,800
35,761

45,700
76,200
3,200
270,000
12,800
35,761

19,050
38,100
3,200
22,500
12,800
35,761

19,050
76,200
3,200
270,000
12,800
35,761

45,700
38,100
12,400
15,000
35,761

45,700
76,200
248,000
30,000
35,761

45,700
38,100
22,500
15,000

91,400
76,200
450,000
30,000
0

19,050
38,100
22,500
15,000
36,197

19,050
76,200
450,000
30,000
36,197

87,550
102,050
19,406

87,550
102,050
19,406

87,550
103,300
19,406

87,550
103,300
19,406

33,100
10,900
2,100
2,060
25,289

33,100
10,900
2,100
2,060
25,289

106,200
10,900
2,100
2,060
14,109

106,200
10,900
2,100
2,060
14,109

73,140
10,900
2,100
2,060

73,140
10,900
2,100
2,060

Hal. 10
No

Uraian pekerjaan
Upah Pemasangan

Satuan
Unit

Volume
1

Harga Satuan Jumlah Harga


Rp
681,245

Rp
681,245

Hal. 11
No

Uraian pekerjaan

44 MJ6 - T (CJ4)
Insulating Tape (MJ6-T)
Split Plastic Slave (Tutup Kabel)
Stoping Buckel / Yokes
Plastic Strap For Clamping
Stainless Stell Strap 20 x 0,7 mm2
Upah Pemasangan
45 CG105 - 50
Amor rod tapping
Aluminium connector
Braket transformer
Clamp hot line top assembly
Distribusi trafo 50 KVA
Jamper requaired
Kabel TX 2 x 70
Upah Pemasangan
46 P.12
Bolt Machine 5/8 x 12 "
Pipa galvanis 3"
Upah pasang
47 P12.C
Cross Arm Stell 2000
Bolt Machine 5/8" x 10 "
Washer Square 2 1/4 "
Upah Pemasangan
48 P12.C'
Cross Arm Stell 2000
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 12"
Upah Pemasangan
49 CM5 - 2
Isolator Tumpu 20 KV (Short Sank)
Center Bracket 12,5 KN
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Compression terminal Lug 35mm2
Upah Pemasangan
50 CM2-11
Ground rod 5/8" x 8" copper weld
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 16 mm2
Ground lug & washer
Upah Pemasangan
51 CM2 - 12
Bimetal Connector
Ground wire Cu 16mm2
Ground lug & Washer
Upah Pemasangan
52 CM2 - 12A
Bimetal Connector
Ground wire Cu 16mm2
Ground lug & Washer
Upah Pemasangan
53 CM2-15
Pole Band Double Rack 9" s/d 12"
Pole Band Double Rack 7" atau 7 1/2"
Ground rod 5/8" x 8" copper weld
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 50 mm2
Ground lug & washer
Grounding Iron Plate form Plat/Earth safety mats

Satuan
Unit
bh
bh
bh
bh
mtr
Unit
Unit
set
bh
bh
bh
bh
bh
mtr
unit
Unit
bh
mtr
set
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
mtr
bh
bh

Volume
1
1
1
1
1
1
1
1
1
3
2
1
1
1
3
1
1
2
3
1
1
1
2
2
1
1
2
2
2
1
1
1
1
2
2
1.8
2
1
1
1
1
1
2
2
1
1
1
0.8
1
1
1
1
1
1
1
1
1
2
4
4
2
7
2
1

Harga Satuan Jumlah Harga


Rp

Rp

23,300
2,100
2,100
2,060
10,900
681,245

23,300
2,100
2,100
2,060
10,900
681,245

16,900
26,400
334,750
149,350
33,359,700
#REF!
#REF!
681,245

16,900
79,200
669,500
149,350
33,359,700
#REF!
#REF!
681,245

17,600
203,200
21,429

35,200
609,600
21,429

359,500
19,050
3,200
29,948

359,500
38,100
6,400
29,948

359,500
19,050
29,200
29,948

719,000
38,100
58,400
29,948

215,600
79,900
16,900
3,200
6,600
36,050
11,979

215,600
79,900
33,800
6,400
11,880
72,100
11,979

119,800
13,900
40,400
23,200
11,300
19,406

119,800
13,900
40,400
34,800
22,600
19,406

40,400
23,200
11,300
147,501

40,400
18,560
11,300
147,501

40,400
23,200
11,300
14,488

40,400
23,200
11,300
14,488

36,900
45,700
119,800
13,900
40,400
67,300
11,300
1,138,400

36,900
91,400
479,200
55,600
80,800
471,100
22,600
1,138,400

Hal. 12
No

Uraian pekerjaan

Satuan

Compression Connector H type 150/240 mm2


Upah Pemasangan

bh
Unit

Volume
1
1

Harga Satuan Jumlah Harga


Rp
40,000
54,825

Rp
40,000
54,825

Hal. 13
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

54 CM3-4
Pole Band Double Rack 7" atau 7 1/2"
Compression terminal Lug 35mm2
Fuse Cut Out 20 KV, 100 A
Fuse link
Bracket Extension for cut out
Upah Pemasangan
55 CM2-11 M
Ground rod 5/8" x 8" copper weld
Clamp ground rod 5/8"
Bimetal Connector
Ground wire Cu 16 mm2
Ground lug & washer
Pipa Paralon 1/2"
Stoping Buckel / Yokes
Stainless Stell Strap 20 x 0,7 mm2
Upah Pemasangan
56 CM5-3
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
57 CM5-4
Isolator Tumpu 20 KV (Short Sank)
Pole Band Double Rack 7" atau 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
58 CM5-5
Isolator Tumpu 20 KV (Short Sank)
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
59 CM5-6
Compression connector H type 70 mm2/70mm2
AAAC 70 mm2
Lightning arrester 20 KV, 5 KA
Upah Pemasangan
60 CM5-8
Isolator tarik (suspension ) 20 KV
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Primary Dead End Clamp (150 s/d 240 ) mm2
Upah Pemasangan
61 CM5-9
Fuse Cut Out 20 KV, 100 A
Fuse link
Compression terminal Lug 35mm2
Upah Pemasangan
62 CM5-12
Pole Band Single rack 7 1/2"
Cross arm steel 1.500 mm (UNP 10 ) Galvanis
Washer Square 2 1/4 "
Upah Pemasangan
63 CM5-13
Pole Band Single rack 7 1/2"
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Upah Pemasangan
64 CM5-16
Bolt machine 5/8" x 10"
Pole Band Single rack 8" atau 8 1/2"
Cross arm steel 3.000 mm (UNP 10 ) Galvanis
Washer Square 2 1/4 "
Upah Pemasangan

Unit
bh
bh
bh
bh
bh
Unit

1
2
1
1
1
1
1

bh
bh
bh
mtr
bh
mtr
bh
mtr
Unit
Unit
bh
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
unit
bh
bh
bh
unit
unit
bh
bh
bh
Unit
Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
Unit

1
1
1
10
2
5.5
6
4.8
1
1
1
1
2
1
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
2
2
1
1
1
1
1
2
1

Rp

45,700
36,050
1,133,000
#REF!
60,500
29,948

91,400
36,050
1,133,000
#REF!
60,500
29,948

119,800
13,900
40,400
23,200
11,300
9,700
2,100
10,900
19,406

119,800
13,900
40,400
232,000
22,600
53,350
12,600
52,320
19,406

45,700
21,779

45,700
21,779

215,600
45,700
6,600
51,017

215,600
45,700
13,200
51,017

215,600
3,200
6,600
35,761

215,600
6,400
13,200
35,761

28,600
49,500
724,300
51,017

28,600
49,500
724,300
51,017

245,200
45,700
18,000
19,096
3,200
94,300
35,761

245,200
45,700
18,000
19,096
3,200
94,300
35,761

1,133,000
#REF!
36,050
35,761

1,133,000
#REF!
36,050
35,761

29,500
269,600
3,200
17,688

29,500
269,600
6,400
17,688

29,500
26,400
4,000
22,967

29,500
52,800
8,000
22,967

19,050
30,900
539,400
3,200
17,688

19,050
30,900
539,400
6,400
17,688

Hal. 14
No

Uraian pekerjaan

65 CM5-20
Isolator tarik (suspension ) 20 KV
Shackle Anchor 5/8
Oval Eye Nut 5/8"
Primary Dead End Clamp (150 s/d 240 ) mm2
Upah Pemasangan

Satuan
Unit
bh
bh
bh
bh
Unit

Volume
1
1
1
1
1
1

Harga Satuan Jumlah Harga


Rp

Rp

245,200
18,000
19,096
94,300
22,967

245,200
18,000
19,096
94,300
22,967

Hal. 15
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

66 CJ5
Bolt double up set 5/8" x 10"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
67 CJ6

68

69

70

71

72

73

74

75

Oval eye bolt 5/8" x 10"


Washer Square 2 1/4 "
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Armour tipe 1/4" wide
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
CJ6X / SJ6X
Oval Eye Nut 5/8"
Armour tipe 1/4" wide
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
CJ7
Oval eye bolt 5/8" x 10"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CJ8
Bolt single Upset 5/8" x 10"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
CJ10
Bolt machine 5/8" x 10"
Washer Square 2 1/4 "
Spool Insulator Ansi 53-2
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
SJ5
Pole Band Single Up Set 7" atau 7 1/2"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
SJ6
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Armour tipe 1/4" wide
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
SJ7
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Spool Insulator Ansi 53-4
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
SJ8
Pole Band Single Up Set 7" atau 7 1/2"
Spool Insulator Ansi 53-2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Unit
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
set
bh
Unit
Unit
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
mtr
Unit

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
0.8
1
1
1
1
0.8
1
1
1
1
1
1
0.8
1
1
1
1
0.8
1
1
1
1
1
1
1
2
1
1
1
1
1
1
0.8
1
1
1
1
0.8
1

Rp

27,600
36,050
6,600
17,688

27,600
36,050
6,600
17,688

16,750
3,200
19,050
41,200
5,900
25,770
30,946

16,750
3,200
19,050
41,200
5,900
25,770
30,946

19,096
5,900
19,050
41,200
25,770
17,688

19,096
5,900
19,050
41,200
51,540
17,688

16,750
3,200
19,050
41,200
6,600
30,946

16,750
3,200
19,050
41,200
5,280
30,946

30,200
36,050
6,600
17,688

30,200
36,050
5,280
17,688

19,050
3,200
36,050
18,540
6,600
18,862

19,050
3,200
36,050
18,540
5,280
18,862

47,300
36,050
6,600
36,277

47,300
36,050
5,280
36,277

29,500
19,096
19,050
41,200
5,900
25,770
30,946

29,500
19,096
19,050
41,200
5,900
51,540
30,946

29,500
19,096
19,050
41,200
6,600
30,946

29,500
19,096
19,050
41,200
5,280
30,946

47,300
36,050
6,600
21,779

47,300
36,050
5,280
21,779

Hal. 16
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

76 SJ10
Pole Band Single rack 7 1/2"
Bracket Secondary / bracket Insulated
Spool Insulator Ansi 53-4
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Unit
bh
bh
bh
mtr
Unit

1
1
1
1
0.8
1

29,500
18,540
41,200
6,600
18,862

Rp
29,500
18,540
41,200
5,280
18,862

Hal. 17
No

Uraian pekerjaan

77 SA1
Isolator Tumpu ( line post) 20 KV
Spool Insulator Ansi 53-2
Center Bracket 12,5 KN
Pole Band Single Up set 7" atau 7 1/2"
Pole Band Single rack 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
78 SA1'
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Pole Band Single rack 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
79 SA2
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53-2
Center Bracket 12,5 KN
Pole Band Single rack 7 1/2"
Bracket Secondary / bracket Insulated
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
80 SA2'
Isolator tumpu ( pin post) 20 KV
Center Bracket 12,5 KN
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
81 SA3
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator Ansi 53-4
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Primary Dead End Clamp 35 s/d 70 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Shackle Anchor 5/8
Armour Rod # for AAAC 70 mm2
Upah Pemasangan
82 SA3'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Angle Clamp 35 s/d 70 mm2
Armour Rod # for AAAC 70 mm2
Upah Pemasangan
83 SA4
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Compression Connector H type 70/150 mm2
Armour Rod # for AAAC 70 mm2
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Shackle Anchor 5/8
Upah Pemasangan
84 SA4'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"

Satuan
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
mtr
bh
set
Unit
Unit
bh
bh
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
unit
Unit
bh
bh
bh

Volume
1
1
1
1
1
2
2.6
1
1
1
1
2
1.8
1
1
2
1
2
1
1
2.8
2
1
1
2
2
2
2
1
1
1
1
2
2
1
1
0.8
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
4
4
2
2
2
4
2
1
1
2
2
2

Harga Satuan Jumlah Harga


Rp

Rp

215,600
36,050
79,900
47,300
29,500
6,600
35,316

215,600
36,050
79,900
47,300
59,000
17,160
35,316

215,600
79,900
29,500
6,600
32,399

215,600
79,900
59,000
11,880
32,399

215,600
36,050
79,900
29,500
18,540
6,600
45,700
51,017

431,200
36,050
159,800
29,500
18,540
18,480
91,400
51,017

215,600
79,900
6,600
45,700
48,100

431,200
159,800
13,200
91,400
48,100

245,200
41,200
29,500
19,096
19,050
67,300
6,600
18,000
60,500
27,190

245,200
41,200
59,000
38,192
19,050
67,300
5,280
18,000
60,500
27,190

245,200
45,700
19,096
18,000
56,650
60,500
24,262

245,200
45,700
19,096
18,000
56,650
60,500
24,262

245,200
41,200
19,050
29,500
19,096
37,000
60,500
67,300
25,770
18,000
27,190

490,400
82,400
38,100
118,000
76,384
74,000
121,000
134,600
103,080
36,000
27,190

245,200
29,500
19,096

490,400
59,000
38,192

Hal. 18
No

Uraian pekerjaan
Compression Connector H type 70/150 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan

Satuan
bh
bh
bh
Unit

Volume
1
2
2
1

Harga Satuan Jumlah Harga


Rp
37,000
18,000
67,300
24,262

Rp
37,000
36,000
134,600
24,262

Hal. 19
No

Uraian pekerjaan

85 SA5
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
86 SA5'

87

88

89

90

91

Isolator Tarik 20 KV ( 2 pcs )


Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
SA5-1
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Armour Rod # for AAAC 70 mm2
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Shackle Anchor 5/8
Compression Connector H type 70/150 mm2
Upah Pemasangan
SA5-1'
Isolator Tarik 20 KV ( 2 pcs )
Pole Band Single rack 7 1/2"
Oval Eye Nut 5/8"
Primary Dead End Clamp 35 s/d 70 mm2
Shackle Anchor 5/8
Compression Connector H type 70/150 mm2
Upah Pemasangan
SA6
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Oval Eye Nut 5/8"
Primary Dead End Clamp 35 s/d 70 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Armour Rod # for AAAC 70 mm2
Pole Band Single rack 7 1/2"
Shackle Anchor 5/8
Upah Pemasangan
SA6'
Isolator Tarik 20 KV ( 2 pcs )
Oval Eye Nut 5/8"
Primary Dead End Clamp 35 s/d 70 mm2
Pole Band Single rack 7 1/2"
Shackle Anchor 5/8
Upah Pemasangan
B1
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Washer Square 2 1/4 "
Pole Band Double Rack 7" atau 7 1/2"

Satuan
Unit
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
set
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
mtr
bh
bh

Volume
1
1
1
1
2
2
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
2
2
2
4
2
4
2
2
2
1
1
2
2
2
1
2
1
1
2
1
2
2
10.4
4
2

Harga Satuan Jumlah Harga


Rp

Rp

245,200
41,200
19,050
29,500
19,096
60,500
18,000
67,300
25,770
51,017

245,200
41,200
19,050
59,000
38,192
60,500
18,000
67,300
51,540
51,017

245,200
29,500
19,096
18,000
67,300
57,891

245,200
29,500
19,096
18,000
67,300
57,891

245,200
41,200
19,050
29,500
19,096
60,500
67,300
25,770
18,000
37,000
55,695

245,200
41,200
19,050
59,000
38,192
60,500
67,300
51,540
18,000
74,000
55,695

245,200
29,500
19,096
67,300
18,000
37,000
278,478

245,200
29,500
19,096
67,300
18,000
37,000
278,478

245,200
41,200
19,050
19,096
67,300
25,770
60,500
29,500
18,000
67,917

490,400
82,400
38,100
76,384
134,600
103,080
121,000
59,000
36,000
67,917

245,200
19,096
67,300
29,500
18,000
339,584

490,400
38,192
134,600
29,500
36,000
339,584

215,600
269,600
21,950
4,000
6,600
3,200
45,700

431,200
269,600
43,900
8,000
68,640
12,800
91,400

Hal. 20
No

Uraian pekerjaan
Upah Pemasangan

Satuan
Unit

Volume
1

Harga Satuan Jumlah Harga


Rp
140,340

Rp
140,340

Hal. 21
No

Uraian pekerjaan

92 B1A
Isolator tumpu (line post) 20 KV
Side Bracket 12,5 KN
Bolt Machine 5/8 x 12 "
Tie Wire #4 / Aluminium Bonding Wire #20
Washer Square 2 1/4 "
Upah Pemasangan
93 B2
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Washer Square 2 1/4 "
Bolt Double Arming 5/8" x 12"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
94 B3
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval Eye Nut 5/8"
Tie Wire #4 / Aluminium Bonding Wire #20
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Compression Connector H type 70/150 mm2
Upah Pemasangan
95 B4
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Cross Arm Stell 1500
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Compression Connector H type 70/150 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
96 B5
Isolator Tarik 20 KV ( 2 pcs )
Cross Arm Stell 1500
Brace steel 550 mm
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 12"
Bolt Machine 5/8" x 8"
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Primary Dead End Clamp 35 s/d 70 mm2
Upah Pemasangan
97 CC1
Isolator Tarik 20 KV ( 2 pcs )
Spool Insulator ansi 53-2
Center Bracket 12,5 KN

Satuan
Unit
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh

Volume
1
2
2
2
10.4
2
1
1
4
2
4
2
4
3
4
10.4
1
1
4
1
2
4
2
3
4
4
2.6
4
4
2
1
1
4
1
8
4
5
2
4
8
4
4
4
4
4
5.2
1
1
2
2
4
2
2
2
4
4
2
2
3
1
1
3
1
1

Harga Satuan Jumlah Harga


Rp

Rp

215,600
69,300
17,600
6,600
3,200
67,917

431,200
138,600
35,200
68,640
6,400
67,917

215,600
269,600
21,950
45,700
3,200
29,200
4,000
6,600
55,695

862,400
539,200
87,800
91,400
12,800
87,600
16,000
68,640
55,695

245,200
215,600
269,600
21,950
45,700
29,200
4,000
19,096
6,600
18,000
67,300
37,000
57,891

980,800
215,600
539,200
87,800
91,400
87,600
16,000
76,384
17,160
72,000
269,200
74,000
57,891

245,200
215,600
21,950
45,700
29,200
16,900
3,200
4,000
269,600
19,096
18,000
67,300
37,000
6,600
57,891

980,800
215,600
175,600
182,800
146,000
33,800
12,800
32,000
1,078,400
76,384
72,000
269,200
148,000
34,320
57,891

245,200
269,600
21,950
45,700
29,200
16,900
3,200
4,000
19,096
18,000
67,300
57,891

490,400
539,200
87,800
91,400
58,400
33,800
12,800
16,000
38,192
36,000
201,900
57,891

245,200
36,050
79,900

735,600
36,050
79,900

Hal. 22
No

Uraian pekerjaan
Side Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Satuan
bh
bh
bh
bh
mtr
Unit

Volume
2
4
1
3
8.6
1

Harga Satuan Jumlah Harga


Rp
69,300
19,050
30,200
3,200
6,600
54,964

Rp
138,600
76,200
30,200
9,600
56,760
54,964

Hal. 23
No

Uraian pekerjaan

98 CC1'
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Side Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
99 CC1-1
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500
Brace steel 550 mm
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7 1/2"
Upah Pemasangan
100 CC1-A
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500
Brace steel 550 mm
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine 5/8" x 10"
Bolt single Upset 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7 1/2"
Upah Pemasangan
101 CC.1-A'
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500
Brace steel 550 mm2
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt Machine 5/8" x 10"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole band Single Rack 71/2"
Upah Pemasangan
102 CC.2
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53-2
Side Bracket
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bracket Secondary / Bracket Insulated
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
103 CC.2'
Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Side Bracket
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "

Satuan
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh

Volume
1
3
1
2
4
4
7.8
1
1
2
1
1
1
2
1
4
3
1
2
8.6
1
1
1
2
1
1
1
2
1
4
3
1
2
8.6
1
1
1
2
1
1
2
1
3
2
3
7.8
1
1
1
3
1
2
1
4
1
3
8.6
1
1
1
1
2
4
2

Harga Satuan Jumlah Harga


Rp

Rp

215,600
79,900
69,300
19,050
3,200
6,600
67,917

646,800
79,900
138,600
76,200
12,800
51,480
67,917

215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
30,200
4,000
6,600
29,500
64,999

431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
30,200
8,000
56,760
29,500
64,999

215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
30,200
4,000
6,600
29,500
67,917

431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
30,200
8,000
56,760
29,500
67,917

215,600
215,600
269,600
21,950
79,900
3,200
4,000
19,050
6,600
29,500
67,917

431,200
215,600
269,600
43,900
79,900
9,600
8,000
57,150
51,480
29,500
67,917

215,600
269,600
69,300
79,900
19,050
18,540
3,200
6,600
64,999

646,800
269,600
138,600
79,900
76,200
18,540
9,600
56,760
64,999

215,600
79,900
69,300
19,050
3,200

215,600
79,900
138,600
76,200
6,400

Hal. 24
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

Tie Wire #4 / Aluminium Bonding Wire #20


Upah Pemasangan

mtr
Unit

7.8
1

6,600
67,917

Rp
51,480
67,917

Hal. 25
No

Uraian pekerjaan

104 CC2 - A
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 1500 (UNP 10) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Bracket Secondary / Bracket insulated
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
105 CC2-1
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool insulator ansi 53-2
Cross Arm Stell 3000 (UNP 10) galvanis
Brace steel 770 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Bracket Secondary / Bracket insulated
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
106 CC2 - A'
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Cross Arm Stell 1500 (UNP 10) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Double Rack 7" atau 7 1/2"
Upah Pemasangan
107 CC.3
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53 - 2
Clevis Swinging Secondary
Primary Angle Clamp 150 s/d 240 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Armour Rod # for AAAC 240 mm2
Pole Band Single rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Shackle Anchor 5/8"
Upah Pemasangan
108 CC.3'
Isolator Tarik 20 KV ( 2 pcs )
Primary Angle Clamp 150 s/d 240 mm2
Armour Rod # for AAAC 240 mm2
Oval Eye Nut 5/8"
Shackle Anchor 5/8"
Washer Square 2 1/4 "
Upah Pemasangan

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
mtr
set
bh
bh
bh
Unit
Unit
bh
bh
set
bh
bh
bh
Unit

Volume
1
4
2
1
2
4
2
3
3
4
4
16.4
1
1
1
1
4
2
1
2
4
2
5
3
4
4
16.4
1
1
1
1
4
2
2
4
2
5
3
4
2
15.6
1
1
1
3
1
1
3
0.8
3
4
3
3
1
1
3
3
3
3
3
6
1

Harga Satuan Jumlah Harga


Rp

Rp

215,600
215,600
36,050
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
18,540
45,700
67,917

862,400
431,200
36,050
539,200
87,800
159,800
57,150
87,600
16,000
12,800
108,240
18,540
45,700
67,917

215,600
215,600
36,050
539,400
26,400
79,900
19,050
29,200
4,000
3,200
6,600
18,540
45,700
67,917

862,400
431,200
36,050
1,078,800
105,600
159,800
95,250
87,600
16,000
12,800
108,240
18,540
45,700
67,917

215,600
215,600
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
45,700
64,999

862,400
431,200
539,200
87,800
159,800
95,250
87,600
16,000
6,400
102,960
45,700
64,999

245,200
36,050
19,050
60,500
6,600
121,250
29,500
19,096
18,000
86,546

735,600
36,050
19,050
181,500
5,280
363,750
118,000
57,288
54,000
86,546

245,200

735,600
0
363,750
57,288
54,000
19,200
83,618

121,250
19,096
18,000
3,200
83,618

Hal. 26
No

Uraian pekerjaan

109 CC 7
Isolator Tarik 20 KV ( 2 pcs )
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Arrmour tipe 1/4" wide
Clevis Swinging Secondary
Primary Dead End Clamp 150 s/d 240 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Shackle Anchor 5/8"
Upah Pemasangan
110 CC 7'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8"
Primary Dead End Clamp 150 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Oval eye bolt 5/8" x 10"
Upah Pemasangan
111 CC 7 A
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53 - 4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Arrmour tipe 1/4" wide
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Shackle Anchor 5/8"
Primary Dead End Clamp 150 s/d 240 mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
112 CC 7 A'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Oval Eye Nut 5/8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Shackle Anchor 5/8"
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit

Volume
1
3
3
1
2
4
1
3
1
3
11
1
1
3
2
4
3
1
1
3
2
4
1
3
3
10
3
3
4
1
1
1
3
1
2
4
2
3
1
3
1
4
11
1
3
3
2
1
1
3
2
4
1
3
1
2
4
11
3
3
1

Harga Satuan Jumlah Harga


Rp

Rp

245,200
18,000
41,200
60,500
21,950
45,700
29,200
16,750
19,096
3,200
5,900
19,050
94,300
25,770
4,000
18,000
140,340

735,600
54,000
41,200
121,000
87,800
45,700
87,600
16,750
57,288
35,200
5,900
19,050
282,900
51,540
16,000
54,000
140,340

245,200
359,500
21,950
45,700
29,200
19,096
3,200
18,000
94,300
4,000
16,750
140,340

735,600
719,000
87,800
45,700
87,600
57,288
32,000
54,000
282,900
16,000
16,750
140,340

245,200
41,200
269,600
21,950
45,700
29,200
16,750
19,096
5,900
4,000
3,200
19,050
18,000
94,300
25,770
137,414

735,600
41,200
539,200
87,800
91,400
87,600
16,750
57,288
5,900
16,000
35,200
19,050
54,000
282,900
51,540
137,414

245,200
269,600
21,950
45,700
29,200
16,750
19,096
4,000
3,200
18,000
94,300
55,695

735,600
539,200
87,800
45,700
87,600
16,750
38,192
16,000
35,200
54,000
282,900
55,695

Hal. 27
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

113 CC 8
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Arrmour tipe 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Center Bracket 12,5 KN
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 1500 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Washer Square 2 1/4 "
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan
114 CC 8 - A
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Arrmour tipe 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 10"
Bolt Machine 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 1500 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Shackle Anchor 5/8"
Spool insulator ansi 53 - 4
Washer Square 2 1/4 "
Primary Dead End Clamp 150 s/d 240 mm2
Upah Pemasangan
115 CC 8 A'
Isolator tumpu 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8"
Tie Wire #4 / Aluminium Bonding Wire #20
Compression Connector H type 150/240mm2
Primary Dead End Clamp 150 s/d 240 mm2
Bolt Machine 5/8" x 8"
Upah Pemasangan
116 SC . 1
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53 - 2
Center Bracket 12,5 KN

Unit
bh
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
bh
Unit
Unit
bh
bh
bh

1
2
1
6
7.8
4
1
3
1
4
1
4
2
4
2
7
2
6
2
11
6
1
1
3
6
7.8
8
1
5
1
2
8
4
2
4
4
7
6
6
2
21
6
1
1
3
6
4
8
4
1
8
4
5
21
6
7.8
4
6
2
1
1
3
1
1

Rp

215,600
215,600
245,200
6,600
26,400
5,900
29,200
16,750
4,000
79,900
25,770
19,050
43,280
269,600
19,096
45,700
18,000
41,200
3,200
94,300
55,695

431,200
215,600
1,471,200
51,480
105,600
5,900
87,600
16,750
16,000
79,900
103,080
38,100
173,120
539,200
133,672
91,400
108,000
82,400
35,200
565,800
55,695

215,600
245,200
6,600
26,400
5,900
29,200
16,750
16,900
4,000
25,770
19,050
43,280
269,600
19,096
45,700
18,000
41,200
3,200
94,300
55,695

646,800
1,471,200
51,480
211,200
5,900
146,000
16,750
33,800
32,000
103,080
38,100
173,120
1,078,400
133,672
274,200
108,000
82,400
67,200
565,800
55,695

215,600
245,200
359,500
26,400
29,200
16,750
4,000
45,700
19,096
3,200
18,000
6,600
43,280
94,300
16,900
54,964

646,800
1,471,200
1,438,000
211,200
116,800
16,750
32,000
182,800
95,480
67,200
108,000
51,480
173,120
565,800
33,800
54,964

215,600
36,050
79,900

646,800
36,050
79,900

Hal. 28
No

Uraian pekerjaan
Side Bracket
Bolt Machine 5/8" x 10"
Pole Band Single Up set 7" atau 7 1/2"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan

Satuan
bh
bh
bh
bh
set
Unit

Volume
2
4
1
4
8.6
1

Harga Satuan Jumlah Harga


Rp
69,300
19,050
47,300
3,200
6,600
67,917

Rp
138,600
76,200
47,300
12,800
56,760
67,917

Hal. 29
No

Uraian pekerjaan

117 SC. 1'


Isolator tumpu (line post) 20 KV
Center Bracket 12,5 KN
Side Bracket
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
118 SC . 1 - A
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Spool Insulator Ansi 53 - 2
Cross arm steel 1500
Brace steel 550 mm2
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine 5/8" x 10"
Pole Band Single rack 7" atau 7 1/2"
Pole Band Single Up set 7" atau 7 1/2"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
119 SC 1 - A '
Isolator tumpu (pin post) 20 KV
Isolator tumpu (line post) 20 KV
Cross arm steel 1500
Brace steel 550 mm2
Center Bracket 12,5 KN
Washer Square 2 1/4 "
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt Machine 5/8" x 10"
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan
120 SC 2
Isolator tumpu (pin post) 20 KV
Spool Insulator Ansi 53 - 2
Side Bracket
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Bracket secondary / bracket insulated
Washer Square 2 1/4 "
Pole Band Single rack 7" atau 7 1/2"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
121 SC 2 '
Isolator tumpu (pin post) 20 KV
Side Bracket
Center Bracket 12,5 KN
Bolt Machine 5/8" x 10"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
122 SC2-A
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Spool insulator ansi 53-2
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "

Satuan
Unit
bh
bh
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Volume
1
3
1
2
4
4
7.8
1
1
2
1
1
1
2
1
4
3
3
1
2
8.6
1
1
2
1
1
2
1
3
2
3
7.8
1
1
1
3
1
2
1
4
1
2
1
8.6
1
1
2
2
1
4
2
7.8
1
1
2
4
1
2
4
2
2
3
4
10

Harga Satuan Jumlah Harga


Rp

Rp

215,600
79,900
69,300
19,050
3,200
6,600
64,999

646,800
79,900
138,600
76,200
12,800
51,480
64,999

215,600
215,600
36,050
269,600
21,950
79,900
3,200
19,050
29,500
47,300
4,000
6,600
67,917

431,200
215,600
36,050
269,600
43,900
79,900
12,800
57,150
88,500
47,300
8,000
56,760
67,917

215,600
215,600
269,600
21,950
79,900
3,200
4,000
19,050
6,600
29,500
67,917

431,200
215,600
269,600
43,900
79,900
9,600
8,000
57,150
51,480
29,500
67,917

215,600
36,050
69,300
79,900
19,050
18,540
3,200
29,500
6,600
67,917

646,800
36,050
138,600
79,900
76,200
18,540
6,400
29,500
56,760
67,917

215,600
69,300
79,900
19,050
3,200
6,600
64,999

431,200
138,600
79,900
76,200
6,400
51,480
64,999

215,600
215,600
36,050
269,600
21,950
79,900
19,050
29,200
4,000
3,200

431,200
862,400
36,050
539,200
87,800
159,800
38,100
87,600
16,000
32,000

Hal. 30
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

Tie Wire #4 / Aluminium Bonding Wire #20


Bracket secondary / bracket insulated
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan

mtr
bh
bh
Unit

16.4
1
2
1

6,600
18,540
29,500
67,917

Rp
108,240
18,540
59,000
67,917

Hal. 31
No

Uraian pekerjaan

123 SC2-A'
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Center Bracket 12,5 KN
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan
124 SC3
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Clevis Swinging Secondary
Primary Angle Clamp 150 s/d 240 mm2
Tie Wire #4 / Aluminium Bonding Wire #20
Arrmour rod # for AAAC 240 mm2
Pole band single rack 8" x 8 1/2"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Upah Pemasangan
125 SC3'
Isolator Tarik 20 KV ( 2 pcs )
Primary Angle Clamp 150 s/d 240 mm2
Arrmour rod # for AAAC 240 mm2
Oval eye bolt 5/8" x 8"
Pole band single rack 8" x 8 1/2"
Shackle Anchor 5/8
Arrmour rod # for AAAC 150 mm2
Upah Pemasangan
126 SC7
Isolator Tarik 20 KV ( 2 pcs )
Shackle Anchor 5/8
Spool insulator ansi 53-4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Single rack 7" atau 7 1/2"
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Armour tape 1/4" wide
Clevis Swinging Secondary
Primary dead end clamp(150 s/d 240)mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Upah Pemasangan
127 SC7'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary dead end clamp(150 s/d 240)mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
Unit
Unit
bh
bh
bh
bh
mtr
set
bh
bh
bh
Unit
Unit
bh
bh
set
bh
bh
bh
set
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Volume
1
2
4
2
4
2
2
2
4
10
15.6
1
1
1
3
1
1
3
0.8
3
4
8
3
1
1
3
3
3
3
4
3
1
1
1
3
3
1
2
4
1
2
2
3
1
3
10
1
1
3
2
4
1
1
3
2
4
2
2
3
3
10
3
3
4

Harga Satuan Jumlah Harga


Rp

Rp

215,600
215,600
269,600
21,950
79,900
19,050
29,200
4,000
3,200
6,600
29,500
64,999

431,200
862,400
539,200
87,800
159,800
38,100
58,400
16,000
32,000
102,960
29,500
64,999

245,200
41,200
19,050
60,500
6,600
121,250
30,900
3,200
18,000
86,546

735,600
41,200
19,050
181,500
5,280
363,750
123,600
25,600
54,000
86,546

245,200
60,500
121,250
16,750
30,900
18,000
80,800
83,618

735,600
181,500
363,750
50,250
123,600
54,000
80,800
83,618

245,200
18,000
41,200
269,600
21,950
29,500
45,700
19,050
29,200
16,750
19,096
3,200
5,900
19,050
94,300
25,770
4,000
140,340

735,600
54,000
41,200
539,200
87,800
29,500
91,400
38,100
87,600
16,750
57,288
32,000
5,900
19,050
282,900
51,540
16,000
140,340

245,200
269,600
21,950
45,700
19,050
29,200
19,096
3,200
18,000
94,300
4,000

735,600
539,200
87,800
91,400
38,100
87,600
57,288
32,000
54,000
282,900
16,000

Hal. 32
No

Uraian pekerjaan
Upah Pemasangan

Satuan
bh

Volume
1

Harga Satuan Jumlah Harga


Rp
140,340

Rp
140,340

Hal. 33
No

Uraian pekerjaan

128 SC7-A
Isolator Tarik 20 KV ( 2 pcs )
Spool insulator ansi 53-4
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Pole Band Single rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Armour tape 1/4" wide
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Clevis Swinging Secondary
Shackle Anchor 5/8
Primary dead end clamp(150 s/d 240)mm2
Loop Dead End Clamp/LC 35 s/d 240 mm2
Upah Pemasangan
129 SC7-A'
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 1500 mm (UNP 10 ) galvanis
Brace steel 550 mm2
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Oval Eye Nut 5/8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Primary dead end clamp (150 s/d 240)mm2
Upah Pemasangan
130 SC8
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Armour tape 1/4" wide
Pole Band Double Rack 7" atau 7 1/2"
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Center Bracket 12,5 KN
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Shackle Anchor 5/8
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan

Satuan
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit

Volume
1
3
1
2
4
2
1
2
3
1
3
1
4
11
1
3
3
2
1
1
3
2
4
2
2
3
1
2
4
4
3
3
1
1
1
2
2
7.8
4
2
3
2
5
1
8
1
4
2
4
2
7
6
2
11
6
1

Harga Satuan Jumlah Harga


Rp

Rp

245,200
41,200
269,600
21,950
45,700
29,500
19,050
29,200
16,750
19,096
5,900
4,000
3,200
19,050
18,000
94,300
25,770
137,414

735,600
41,200
539,200
87,800
91,400
29,500
38,100
87,600
16,750
57,288
5,900
16,000
35,200
19,050
54,000
282,900
51,540
137,414

245,200
269,600
21,950
45,700
19,050
29,200
16,750
19,096
4,000
3,200
18,000
94,300
67,917

735,600
539,200
87,800
91,400
38,100
87,600
16,750
38,192
16,000
12,800
54,000
282,900
67,917

215,600
215,600
245,200
6,600
26,400
5,900
45,700
19,050
29,200
16,750
4,000
79,900
25,770
19,050
40,000
359,500
19,096
18,000
41,200
3,200
94,300
67,917

215,600
431,200
490,400
51,480
105,600
11,800
137,100
38,100
146,000
16,750
32,000
79,900
103,080
38,100
160,000
719,000
133,672
108,000
82,400
35,200
565,800
67,917

Hal. 34
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

131 SC8-A
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Tie Wire #4 / Aluminium Bonding Wire #20
Brace steel 770 mm2
Armour tape 1/4" wide
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt machine 5/8" x 10"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Loop Dead End Clamp/LC 35 s/d 240 mm2
Clevis Swinging Secondary
Compression Connector H type 150/240mm2
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Oval Eye Nut 5/8"
Pole Band Double Rack 7" atau 7 1/2"
Pole band single rack 8" x 8 1/2"
Shackle Anchor 5/8
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan
132 SC8-A'
Isolator tumpu (pin post) 20 KV
Isolator Tarik 20 KV ( 2 pcs )
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt machine 5/8" x 10"
Bolt Double Arming 5/8" x 14"
Oval eye bolt 5/8" x 8"
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 7" atau 7 1/2"
Oval Eye Nut 5/8"
Washer Square 2 1/4 "
Shackle Anchor 5/8
Tie Wire #4 / Aluminium Bonding Wire #20
Compression Connector H type 150/240mm2
Primary dead end clamp (150 s/d 240) mm2
Upah Pemasangan
133 SC9
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Center Bracket 12,5 KN
Bolt machine 5/8" x 10"
Washer Square 2 1/4 "
Cross arm steel 1.500 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole band single rack 8" x 8 1/2"
Pole Band Single Up set 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan
134 SC10
Isolator tumpu (pin post) 20 KV
Bolt machine 5/8" x 10"
Washer Square 2 1/4 "
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole band single rack 8" x 8 1/2"
Pole Band Single Up set 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan

Unit
bh
bh
mtr
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit

1
3
6
7.8
8
1
5
1
2
8
4
2
4
2
7
4
2
6
2
21
6
1
1
3
6
4
8
2
4
1
8
4
5
21
6
7.8
4
6
1

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1
2
1
3
3
1
1
1
1
1
1
1
1
3
1
1
1
1
1
1
1
1
1

Rp

215,600
245,200
6,600
26,400
5,900
29,200
16,750
19,050
4,000
25,770
19,050
40,000
359,500
19,096
45,700
30,900
18,000
41,200
3,200
94,300
65,924

646,800
1,471,200
51,480
211,200
5,900
146,000
16,750
38,100
32,000
103,080
38,100
160,000
719,000
133,672
182,800
61,800
108,000
82,400
67,200
565,800
65,924

215,600
245,200
359,500
26,400
19,050
29,200
16,750
4,000
45,700
19,096
3,200
18,000
6,600
40,000
94,300
80,390

646,800
1,471,200
1,438,000
211,200
38,100
116,800
16,750
32,000
182,800
95,480
67,200
108,000
51,480
160,000
565,800
80,390

215,600
215,600
79,900
19,050
3,200
269,600
215,200
4,000
30,900
47,300
36,050
80,390

215,600
431,200
79,900
57,150
9,600
269,600
215,200
4,000
30,900
47,300
36,050
80,390

215,600
19,050
3,200
359,500
215,200
4,000
30,900
47,300
36,050
80,390

646,800
19,050
3,200
359,500
215,200
4,000
30,900
47,300
36,050
80,390

Hal. 35
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

135 SC 11
Isolator tumpu (pin post) 20 KV
Bolt Double Arming 5/8" x (16 s/d 24")
Washer Square 2 1/4 "
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.682 mm Galvanis
Spool insulator ansi 53-2
Bracket secondary / bracket insulated
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Pole Band Single rack 7" atau 7 1/2"
Upah Pemasangan
136 SC12
Isolator tumpu (pin post) 20 KV
Bolt Double Arming 5/8" x (16 s/d 24")
Washer Square 2 1/4 "
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Steel L 70x70x7x1.000 mm Galvanis
Bracket secondary / bracket insulated
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Pole Band Single rack 7" atau 7 1/2"
Spool insulator ansi 53-2
Upah Pemasangan
137 DC1
Isolator tumpu (pin post) 20 KV
Bolt Machine 5/8" x 10"
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Single Up set 7" atau 7 1/2"
Pole band single rack 8" x 8 1/2"
Spool insulator ansi 53-2
Washer Square 2 1/4 "
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
138 DC2
Isolator tumpu (pin post) 20 KV
Bolt Machine 5/8" x 10"
Washer round 3/8"
Cross arm steel 2.000 mm (UNP 10 ) galvanis
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Brace steel 770 mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Pole Band Double Rack 8" atau 8 1/2"
Bracket secondary / bracket insulated
Spool insulator ansi 53-2
Bolt Double Arming 5/8" x 14"
Tie Wire #4 / Aluminium Bonding Wire #20
Upah Pemasangan
139 DC3
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Primary dead end clamp (150 s/d 240) mm2
Bolt Machine / bolt Carriage 1/2" x 3/4"
Brace steel 770 mm2
Shackle Anchor 5/8
Pole Band Double Rack 8" atau 8 1/2"
Oval Eye Nut 5/8"
Clevis Swinging Secondary
Spool insulator ansi 53-4
Washer Square 2 1/4 "
Cross arm steel 3.000 mm (UNP 10 ) galvanis

Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

1
6
3
11
2
2
1
1
2
1
1
1
1
6
3
10
2
2
1
2
1
1
1
1
1
6
1
1
1
4
4
1
3
1
1
31
1
1
12
4
4
2
2
8
8
3
1
1
5
32
1
1
12
6
12
8
8
6
1
7
1
1
20
2

Rp

215,600
29,200
3,200
359,500
215,200
36,050
18,540
4,000
51,550
29,500
80,390

1,293,600
87,600
35,200
719,000
430,400
36,050
18,540
8,000
51,550
29,500
80,390

215,600
29,200
3,200
539,400
20,600
18,540
4,000
51,550
29,500
36,050
104,817

1,293,600
87,600
32,000
1,078,800
41,200
18,540
8,000
51,550
29,500
36,050
104,817

215,600
19,050
359,500
539,400
26,400
4,000
47,300
30,900
36,050
3,200
6,600
164,712

1,293,600
19,050
359,500
539,400
105,600
16,000
47,300
92,700
36,050
3,200
204,600
164,712

215,600
19,050
359,500
539,400
539,400
26,400
4,000
51,550
18,540
36,050
29,200
6,600
122,785

2,587,200
76,200
1,438,000
1,078,800
1,078,800
211,200
32,000
154,650
18,540
36,050
146,000
211,200
122,785

215,600
215,600
94,300
4,000
26,400
18,000
51,550
19,096
19,050
41,200
3,200
539,400

2,587,200
1,293,600
1,131,600
32,000
211,200
108,000
51,550
133,672
19,050
41,200
64,000
1,078,800

Hal. 36
No

Uraian pekerjaan

Satuan

Cross arm steel 2.000 mm (UNP 10 ) galvanis


Compression Connector H type 150/240mm2
Bolt Machine 5/8" x 10"
Bolt double arming 5/8" x (16" s/d 24")
Upah Pemasangan

bh
bh
bh
bh
Unit

Volume
2
6
1
5
1

Harga Satuan Jumlah Harga


Rp
359,500
40,000
19,050
29,200
13,310

Rp
719,000
240,000
19,050
146,000
13,310

Hal. 37
No

Uraian pekerjaan

Satuan

Volume

Harga Satuan Jumlah Harga


Rp

140 DC4
Isolator Tarik 20 KV ( 2 pcs )
Isolator tumpu (line post) 20 KV
Isolator tumpu (pin post) 20 KV
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt double arming 5/8" x (16" s/d 24")
Brace steel 770 mm2
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Compression Connector H type 240/240mm2
Clevis Swinging Secondary
Armour tape 1/4" wide
Pole Band Double Rack 8" atau 8 1/2"
Oval Eye Nut 5/8"
Oval eye bolt 5/8" x 8"
Primary dead end clamp (150 s/d 240) mm2
Shackle Anchor 5/8
Tie Wire #4 / Aluminium Bonding Wire #20
Washer Square 2 1/4 "
Spool insulator ansi 53-4
Upah Pemasangan
141 DC5
Isolator Tarik 20 KV ( 2 pcs )
Bolt Machine / bolt Carriage 1/2" x 3/4"
Bolt double arming 5/8" x (16" s/d 24")
Brace steel 770 mm2
Pole Band Double Rack 8" atau 8 1/2"
Primary dead end clamp (150 s/d 240) mm2
Oval Eye Nut 5/8"
Cross arm steel 3.000 mm (UNP 10 ) galvanis
Armour tape 1/4" wide
Upah Pemasangan

Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
mtr
bh
bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit

1
12
4
2
4
7
4
2
6
1
1
1
24
12
12
12
15.6
1
1
1
1
6
4
7
4
2
6
7
2
1
1

Rp

245,200
215,600
215,600
4,000
29,200
26,400
539,400
40,000
19,050
5,900
51,550
19,096
16,750
94,300
18,000
6,600
3,200
41,200
130,211

2,942,400
862,400
431,200
16,000
204,400
105,600
1,078,800
240,000
19,050
5,900
51,550
458,304
201,000
1,131,600
216,000
102,960
3,200
41,200
130,211

245,200
4,000
29,200
26,400
51,550
94,300
19,096
539,400
5,900
5,990

1,471,200
16,000
204,400
105,600
103,100
565,800
133,672
1,078,800
5,900
5,990

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

Hal. 38

DAFTAR ANALISA PEKERJAAN

Jumlah Semua
Rp

449,010

373,176

756,562

407,042

655,564

570,708

Hal. 39
Jumlah Semua
Rp

549,260

Hal. 40
Jumlah Semua
Rp

1,285,490

878,839

604,484

408,993

678,484

Hal. 41
Jumlah Semua
Rp
416,764

Hal. 42
Jumlah Semua
Rp

1,146,746

757,817

221,040

197,590

237,940

214,490

254,840

231,390

Hal. 43
Jumlah Semua
Rp
263,290

Hal. 44
Jumlah Semua
Rp

239,840

251,890

225,240

276,690

250,040

301,490

274,840

435,090

408,440

Hal. 45
Jumlah Semua
Rp

412,590

Hal. 46
Jumlah Semua
Rp

328,790

443,661

417,011

435,661

647,600

611,447

209,006

210,256

29,449

18,269

Hal. 47
Jumlah Semua
Rp
685,405

Hal. 48
Jumlah Semua
Rp

696,305

#REF!

666,229

433,948

845,448

431,659

250,906

217,761

89,388

Hal. 49
Jumlah Semua
Rp
2,470,825

Hal. 50
Jumlah Semua
Rp

#REF!

566,376

67,479

325,517

270,961

853,417

461,257

#REF!

323,188

113,267

613,438

Hal. 51
Jumlah Semua
Rp

399,563

Hal. 52
Jumlah Semua
Rp

87,938

142,816

154,474

116,426

89,218

100,982

124,907

197,232

145,072

110,409

Hal. 53
Jumlah Semua
Rp

113,382

Hal. 54
Jumlah Semua
Rp

490,326

398,779

835,987

743,700

580,912

469,408

1,301,154

Hal. 55
Jumlah Semua
Rp

819,454

Hal. 56
Jumlah Semua
Rp

650,999

436,987

729,677

694,574

1,208,881

1,068,276

Hal. 57
Jumlah Semua
Rp
1,065,880

Hal. 58
Jumlah Semua
Rp

747,957

1,821,535

2,585,035

3,515,595

1,663,783

Hal. 59
Jumlah Semua
Rp

1,217,874

Hal. 60
Jumlah Semua
Rp

1,073,697

1,335,659

1,338,577

1,263,847

1,360,999

Hal. 61
Jumlah Semua
Rp
636,097

Hal. 62
Jumlah Semua
Rp

2,530,397

3,125,897

2,499,309

1,657,064

1,313,456

Hal. 63
Jumlah Semua
Rp

1,851,868

2,274,978

2,258,842

1,994,637

Hal. 64
Jumlah Semua
Rp

4,406,897

5,294,797

5,265,394

Hal. 65
Jumlah Semua
Rp

1,162,327

Hal. 66
Jumlah Semua
Rp

1,070,779

1,414,677

1,263,847

1,156,667

848,779

Hal. 67
Jumlah Semua
Rp

2,543,847

Hal. 68
Jumlah Semua
Rp

2,422,359

1,636,126

1,673,118

2,326,168

Hal. 69
Jumlah Semua
Rp
2,162,228

Hal. 70
Jumlah Semua
Rp

2,326,442

2,068,259

3,769,099

Hal. 71
Jumlah Semua
Rp

4,907,206

5,282,000

1,476,890

1,442,390

Hal. 72
Jumlah Semua
Rp

2,789,830

2,781,657

2,881,712

7,191,425

Hal. 73
Jumlah Semua
Rp

7,889,232

Hal. 74
Jumlah Semua
Rp

8,241,775

3,690,462

DAFTAR HARGA SATUAN PEKERJAAN


KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

:
:
:
:

NO.

SNI

KODE

03-2835-2002

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN PERSIAPAN
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
Pengukuran dan Pemasangan Bouwplank
Membersihkan Lapangan dan Perataan
Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm
Bongkaran Beton Bertulang
Bongkaran Dinding Tembok Bata Merah

m'
m'
m2
m2
m3
m3

DT 91-0006
2007

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN TANAH
Galian Tanah Biasa Sedalam 1 m
Galian Tanah Keras Sedalam 1 m
Galian Tanah Cadas Sedalam 1 m
Galian Tanah Lumpur Sedalam 1 m
Pekerjaan Striping Tebing Setinggi 1 m
MembuangTanah sejauh 30 m'
Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
Pemadatan Tanah (per 20 cm)
Urugan Pasir
Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL
Pemasangan Lapisan Ijuk tebal 10 cm
Urugan Sirtu

m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m2
m3

DT 91-0007
2007

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN PONDASI
Pasang Pondasi Batu Kali 1Pc : 3 PP
Pasang Pondasi Batu Kali 1Pc : 5 PP

6
D.6.2
D.6.3
D.6.4
D.6.5
D.6.5
#REF!
#REF!
D.6.9
D.6.10
D.6.11
#REF!

PEKERJAAN DINDING

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN PLESTERAN
Plesteran 1 Pc : 1 Pp Tebal 15 mm
Plesteran 1 Pc : 2 Psr : Tebal 15 mm
Plesteran 1 Pc : 3 Pp Tebal 15 mm

Berapen 1 Pc : 5Pp Tebal 15 mm


Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm
Plesteran Ciprat 1 Pc : 2 Pp
Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp
Acian

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m2
m2

6
#REF!
#REF!

PEKERJAAN KAYU
Membuat Kosen Pintu & Jendela Kayu klas I
Membuat Kosen Pintu & Jendela Kayu klas II (Bengkir)

m3
m3

II

III

IV

DT 91-0009

2007

DT 91-0010

2007

VI

DT 91-0011
2007

URAIAN PEKERJAAN

SAT

#REF!
Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP
Pasang Pondasi Batu Kosong
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah
Pasang Pondasi Sumuran diameter 100 cm

#REF!
#REF!
#REF!
#REF!
#REF!
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Pp
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Pp
#REF!
#REF!
#REF!
Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Pp

#REF!
#REF!
#REF!
Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm
Plesteran 1Pc : 3Pp Tebal 20 mm
#REF!

m3
m3
m3
m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Hal. 75

NO.

SNI

KODE
#REF!

URAIAN PEKERJAAN
Membuat Kosen Pintu & Jendela Kayu klas III (Kruing)

SAT
m3

Hal. 76

NO.

VII

SNI

DT 91-0008
2007

KODE

URAIAN PEKERJAAN

SAT

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
F.6.21c
F.6.22a
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Membuat Pintu KlampStandard Kayu Klas II (Kayu Bengkir)


Membuat Pintu KlampStandard Kayu Klas III (Kayu Kruing)
Membuat Daun Pintu Panel Kayu Klas I (Jati)
Membuat Daun Pintu Panel Kayu Klas II (Bengkir)
Membuat Daun Pintu Panel Kayu Klas III (Kruing)
Membuat Pintu & Jendela Kaca Kayu Klas I (Jati)
Membuat Pintu & Jendela Kaca Kayu Klas II (Bengkir)
Membuat Pintu & Jendela Kaca Kayu Klas III (Kruing)
Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)
Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas III (lbr s/d 90 cm)
Membuat Pintu Plywood rangkap, rangka expose kayu klas I
Membuat Pintu Plywood rangkap, rangka expose kayu klas II
Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I
Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II
Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas I Bentang 6 meter
Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas II Bentang 6 meter
Memasang Konstruksi Kuda-kuda Konvensional Kayu Kelas III Bentang 6 meter
Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I
Memasang konstruksi Gording, Kayu Klas I
Memasang konstruksi Gording, Kayu Klas II
Memasang konstruksi Gording, Kayu Klas III
Memasang Rangka Atap Genteng Keramik, Kayu Klas III
#REF!
Memasang Rangka Atap Genteng Beton, Kayu Klas III
Memasang Rangka Atap Sirap, Kayu Klas III
Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II
Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas III
Memasang Rangka Langit-langit (60x60) cm, kayu Klas II
Memasang Rangka Langit-langit (60x60) cm, kayu Klas III
Memasang Listplank Uk. (3x20)cm Kayu klas I
Memasang Listplank Uk. (3x20)cm Kayu klas II
Memasang Listplank Uk. (3x20)cm Kayu klas III
Memasang Listplank Uk. (3x30)cm Kayu klas III
Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II
Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas III
Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II
Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas III
Memasang Dinding Lambriziring dari Papan klas I
Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm
Memasang Dinding Bilik, Rangka Kayu Klas III
Memasang Dinding Bilik, Rangka Kayu Klas IV

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN BETON
Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
Membuat Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52
Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm, w/c = 0,49
Pembesian dg Besi Polos
Pembesian dg Besi Ulir
Kabel Presstresed Polos/strand
Jaring Kawat baja/Wire Mesh
Memasang Bekisting untuk Pondasi
Memasang Bekisting untuk Sloof
Memasang Bekisting untuk Kolom
Memasang Bekisting untuk Balok
Memasang Bekisting untuk Lantai
Memasang Bekisting untuk Dinding
Memasang Bekisting untuk Tangga
Memasang Jembatan Cor
Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)
Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Kg
Kg
Kg
Kg
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
Hal. 77

NO.

SNI

KODE
#REF!
#REF!
#REF!

URAIAN PEKERJAAN
Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)
Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)
Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

SAT
m3
m3
m3

Hal. 78

NO.

VIII

IX

SNI

KODE

URAIAN PEKERJAAN

SAT

#REF!
#REF!
SPL.1
SPL.1a
SPL.2
SPL.2a
SPL.3
SPL.3a
SPL.4
SPL.4a
SPL.5
SPL.5a
SPL.6
SPL.7
SPL.8
SPL.9
SPL.10

Membuat Kolom Penguat Beton Bertulang (11 x 11) cm


Membuat Ring Balok Beton Bertulang (10 x 15) cm
Sloof 15 / 20 Tulangan dia. 10mm
Sloof 15 / 20 Tulangan dia. 12mm
Soof 15 / 25 Tulangan dia.10mm
Soof 15 / 25 Tulangan dia.12mm
Ringbalk 12 / 15 Tulangan dia.10mm
Ringbalk 12 / 15 Tulangan dia.12mm
Ringbalk 12/20 tulangan dia. 10mm
Ringbalk 12/20 tulangan dia. 12mm
Kolom Praktis 12/12 tulangan dia. 10mm
Kolom Praktis 12/12 tulangan dia. 12mm
Kolom 25 / 20 Tulangan dia. 12mm
Kolom 25 / 25 tulangan dia. 12mm
Balok 20 / 40
Balok 30 / 50
Plat beton tebal 12 cm

m'
m'
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN PENUTUP ATAP


Pasang Atap Genteng Plentong Kecil
Pasang Atap Genteng Kodok / Glasur
Pasang Atap Genteng Press (Kebumen)
Pasang Atap Genteng Press (Jatiwangi)
Pasang Atap Genteng Plentong Super / Besar
Pasang Genteng Bubung Plentong
Pasang Genteng Bubung Kodok / Glasur
Pasang Genteng Bubung Plentong Besar
Pasang Genteng Bubung Pres (Kebumen)
Pasang Genteng Bubung Pres (Jatiwangi)
Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm
Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm
Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm
Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm
Pasang Atap Seng Gelombang
Pasang Atap Nok Seng
Pasang Allumunium Foil / Sisalation
Pasang Atap Asbes Motif Genteng

m2
m2
m2
m2
m2
m'
m'
m'
m'
m'
m2
m2
m2
m2
m2
m'
m2
m2

DT 91-0013
2007

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, 4 mm
Memasang Langit-langit Tripleks Uk (120x240) cm, 6 mm
Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm
Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm
List Langit-Langit Kayu Profil

m2
m2
m2
m2
m2
m2
m'

03-

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
J.6.35a
J.6.35b
#REF!

PEKERJAAN SANITASI
Memasang Closet Duduk / Mono Blok
Memasang Closet Jongkok Porselen
Memasang Urinoir
Memasang Wastafel
Memasang Bak Mandi Batu Bata Vol. 0,30 m3
Memasang Pipa Beton, 15 cm - 20 cm
Memasang Pipa Beton, 30 cm - 100 cm
Memasang Pipa Beton, 30 cm
Memasang Pipa Beton, 40 cm
Memasang Pipa Beton, 50 cm
Memasang Pipa Beton, 60 cm
Memasang Pipa Beton, 80 cm
Memasang Pipa Galvanis "
Memasang Pipa Galvanis 3"
Memasang Pipa Galvanis 4"
Memasang Pipa PVC type AW "
Memasang Pipa PVC type AW 2"
Memasang Pipa PVC type AW 3"
Memasang Bak Cuci Piring Stainles Steel
Memasang Kran 1/2"
Memasang Kran 3/4"
Memasang Floor Drain

03-3436-2002

Unit
Unit
Unit
Unit
Unit
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
Buah
Buah
Buah
Buah
Hal. 79

NO.

SNI

KODE

URAIAN PEKERJAAN

SAT

Hal. 80

NO.

SNI

KODE

XI

DT 91-0014
2007

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN BESI & ALLUMUNIUM


Memasang Besi Profil
Memasang Rangka Kuda-kuda Baja IWF
Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja)
Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
Mengerjakan Pengelasan dengan Las Listrik
Memasang Pintu Rolling Door Besi
Memasang Pintu Lipat (Folding Door)
Memasang Rolling Door Allumunium
Memasang Terali Besi Strip (2x3) cm
Memasang Kawat Nyamuk
Memasang Jendela Nako & Tralis
Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm
Memasang Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30 Lebar 45 cm

03-

6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

PEKERJAAN KUNCI & KACA


Memasang Kunci Tanam Biasa
Memasang Kunci Kamar Mandi
Memasang Kunci Selinder
Memasang Engsel Pintu
Pasang Engsel Jendela Kupu-kupu
Pasang Engsel Angin
Pasang Kait Angin
Pasang Door Closer
Pasang Kunci Selot
Pasang Door Stop
Pasang Rel Pintu Dorong
Pasang Kunci Lemari
Pasang Kaca tebal 3 mm
Pasang Kaca tebal 5 mm
Pasang Kaca Cermin tebal 5 mm

XII

XIII

XIV

DT 91-0012

03-24

6
#REF!
M.6.34
M.6.34a
#REF!
M.6.35a
#REF!
#REF!
#REF!
#REF!
#REF!
6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

URAIAN PEKERJAAN

PEKERJAAN PENUTUP LANTAI & DINDING


Memasang lantai Ubin Granito Uk. 40 x 40 cm
Memasang Lantai Keramik warna 30 x 30 cm
Memasang Lantai Keramik warna 40 x 40 cm
Memasang Lantai Keramik 30 x 30 cm
Memasang Lantai Keramik 40 x 40 cm
Pasang Lantai Keramik 20 x 20 cm
Memasang Lantai Karpet
Memasang Dinding Keramik 10x20 cm,
Memasang Dinding Keramik 20x25 cm,
Memasang Plint Kayu Klas II Ukuran 2x10 cm
PEKERJAAN PENGECATAN
Mengikis / Mengerok Permukaan Cat Tembok Lama
Mencuci Bidang Permukaan Tembok yang Pernah dicat
Mengerok Karat Cat Lama permukaan Baja dg cara manual
Penyabun Permukaan Tembok Lama
Mendempul dan Menggosok Kayu
Pengecatan Kayu Bidang Lama
Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup
Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup
Pelaburan Bidang Kayu dg Teak Oil
Pelaburan Bidang Kayu dg Politur
Pelaburan Bidang Kayu dg Cat Residu & Ter
Pelaburan Bidang Kayu dg Vernis
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
Pengecat Tembok Baru - Exterior (1 lap Cat Dasar 2 lap. Cat Penutup)
Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)
Pengecatan Permukaan Baja dg Meni Besi
Pengecatan Permukaan Baja dg Meni Besi & Perancah
Pengecatan Permukaan Baja lapis Seng (Galvanis) secara
manual sistem 3 lapis Cat Konvensional dg tebal 200 um

SAT

Kg
kg
100 kg
m2
cm
m2
m2
m2
m2
m2
m2
m'
m'

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m'

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Hal. 81

NO.

SNI

KODE

XV
ANALISA HASIL PERHITUNGAN #REF!
SENDIRI
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
XVI

URAIAN PEKERJAAN

PAVING DAN LANGSIRAN


Pasang Paving Blok Abu-abu Tebal 6 cm (K.175)
Pasang Paving Blok Warna Tebal 6 cm (K.175)
Pasang Paving Blok Abu-abu Tebal 8 cm (K.175)
Pasang Paving Blok Warna Tebal 8 cm (K.175)
Pasang Paving Blok Abu-abu (Lokal)
Pasang Paving Blok Warna (Lokal)
Pembuangan tanah sejauh 30 m'
Pembuangan tanah sejauh 100 m'
Pembuangan tanah sejauh 200 m'
Mengangkat tanah sedalam lebih dari 1 m'
Stootwerk beton bertulang

m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3

PEKERJAAN JALAN

Membuat parit Galian tanah


K. 110
Galian tanah untuk konstruksi (menggunakan alat)
K. 111
Pengupasan tanah dan pembersihan semak pada Damija
K. 210
Menggali dan mengangkut tanah untuk mengurug berm dipadatkan
K. 220
Galian tanah untuk konstruksi
K. 224
Penimbunan dan pemadatan
K. 225
Urugan dan pemadatan tanah dasar (menggunakan alat)
K. 221.A
Urugan sirtu dan pemadatan (menggunakan alat)
K. 221.B
Penimbunan dan pemadatan ( Urugan kembali )
K.225 a
Membentuk Bahu jalan keras ( menggunakan sirtu )
K. 410
Membersihkan rumput & tanaman dibahu jalan
K. 422
Konstruksi Lapis Pondasi Bawah ( LPB ) Klas A
K. 511
Konstruksi lapis pondasi bawah ( LPB ) Telford
K. 516
Konstruksi Lapis Pondasi Atas ( LPA ) Klas A
K. 521
Menghampar Lapis Pondasi Atas Aspal Beton ( Laston atas )
K. 528
AAN PENANGANAN JALAN SK.DIRJEN BINA MARGA
NO.015/T/BM/1995
1995
MenghamparNOPEMBER
Lap Pondasi
Atas Aspal Beton ( Laston atas-ATB ) lap perata
K. 528
Laburan aspal pasir ( Buras )
K. 612
1
Laburan aspal satu lapis ( Burtu )
K. 615
Laburan aspal dua lapis ( Burda )
K. 617
2
Lapis penetrasi tebal 5 cm ( Lapen )
K. 618
3
Pelapisan prime coat
K. T04
4
Menghampar dan memadatkan Latasir tebal 2 cm ( Buruh ) /Sandsheet
K. 621 a
Penghamparan dan pemadatan Lataston ( HRS ) lapis perata (menggunakan
K. 636
Perataan lapis permukaan
K. 637
5
Perancah ( Begisting ) untuk beton bertulang
K. 710
Beton struktur / untuk Konstruksi Klas K.225
K. 722
Beton struktur / untuk Konstruksi Klas K.125
#REF!
7
Beton struktur / untuk Konstruksi Klas K.175
K. 725
K.726A
K. 730A
6
8
10
11

K 730
K. 810
K. 011 a
K. 017
K. 026
K. T01
K. T02
K. T03
K. T05
K. T06
K. 035
K. T06 a
K. 322
K. 325
K. T05a
K. T05b
K. T05c
BOW.G.5b
3.1.(1)a

XVII
1
2
3
4

SAT

Beton struktur / untuk Konstruksi Klas K.250


Beton struktur / untuk Konstruksi Klas K.300
Beton struktur / untuk Konstruksi Klas K.350
Konstruksi Pasangan Batu
Plesteran P C
Produksi batu pecah tersaring
Produksi lapis aspal beton ( Laston )
Pengecatan kembali besi
Pengecatan besi baru
Pengecatan besi dengan cat dasar / menie
Pembuatan dan pemasangan konstruksi baja / besi
Pemasangan dekplank jembatan kayu jati
Memproduksi lapis tipis aspal beton
Pemasangan dekplank jembatan kayu bengkire
Stabilisasi tanah / LPB dengan kapur ( Buruh )
Stabilisasi tanah / LPB dengan semen ( Buruh )
Pembuatan dan pemasangan konstruksi baja / besi (kanal 10)
Pembuatan dan pemasangan konstruksi baja / besi (L 50.50.5)
Pembuatan dan pemasangan konstruksi baja / besi (L 70.70.5)
Bronjong Penahan
Galian tanah biasa untuk konstruksi (menggunakan alat)

m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m2
m3
m3
m3
Ton
m3
m2
m2
m2
m2
m2
m2
m2
m3
m2
m3
m3
m3
m3
m3
m3
m3
m2
m3
Ton
m2
m2
m2
kg
m2
Ton
m2
m3
m3
kg
kg
kg
m3
m3

PEKERJAAN JARINGAN LISTRIK


CA1
CA1'
CA2-1
CA2

Pas.
Pas.
Pas.
Pas.

CA1
CA1'
CA2-1
CA2

Unit
Unit
Unit
Unit
Hal. 82

NO.
5
6

SNI

KODE
CA2'
CA3

URAIAN PEKERJAAN

Pas. CA2'
Pas. CA3

SAT
Unit
Unit

Hal. 83

NO.
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

SNI

KODE
CA3'
CA4
CA4'
CA5
CA5'
CA5-1
CA5-1'
CA6
CA6'
SE 1-2 ( 7 M)
E 1-2 ( 7 M )
SE 1-2 ( 9 M)
E 1-2 ( 9 M )
SE 1-2 ( 11 M)
E 1-2 ( 11 M )
SE 1-2 ( 12 M)
E 1-2 ( 12 M )
SE 1-2 ( 7 M)
E 1-2 ( 7 M )
SE 1-2 ( 9 M)
E 1-2 ( 9 M )
SE 1-2 ( 11 M)
E 1-2 ( 11 M )
SE 1-2 ( 12 M)
E 1-2 ( 12 M )
SE1-3 (11 M)
E1-3(11 M)
SE1-3 (12 M)
E1-3 (12 M)
SE2-2
SE2-3
E2-3
F 1-2
F 1-3
J5-T (CJ2)
J7 - T (CJ3)
J6 - T (CJ4)
MJ6 - T (CJ4)
CG105 - 50
P.12
P12.C
P12.C'
CM5 - 2
CM2-11
CM2 - 12
CM2 - 12A
CM2-15
CM3-4
CM2-11 M
CM5-3
CM5-4
CM5-5
CM5-6
CM5-8
CM5-9
CM5-12
CM5-13
CM5-16
CM5-20
CJ5
CJ6
CJ6X / SJ6X
CJ7
CJ8
CJ10
SJ5
SJ6
SJ7
SJ8
SJ10

URAIAN PEKERJAAN

Pas.
Pas.
Pas.
Pas.
Pas.
Pas.
Pas.

CA3'
CA4
CA4'
CA5
CA5'
CA5-1
CA5-1'

Pas. CA6
Pas. CA6'
Pas. SE 1-2 ( 7 M)
Pas. E 1-2 ( 7 M )
Pas. SE 1-2 ( 9 M)
Pas. E 1-2 ( 9 M )
Pas. SE 1-2 ( 11 M)
Pas. E 1-2 ( 11 M )
Pas. SE 1-2 ( 12 M)
Pas. E 1-2 ( 12 M )
Pas. SE 1-2 ( 7 M)
Pas. E 1-2 ( 7 M )
Pas. SE 1-2 ( 9 M)
Pas. E 1-2 ( 9 M )
Pas. SE 1-2 ( 11 M)
Pas. E 1-2 ( 11 M )
Pas. SE 1-2 ( 12 M)
Pas. E 1-2 ( 12 M )
Pas. SE1-3 (11 M)
Pas. E1-3(11 M)
Pas. SE1-3 (12 M)
Pas. E1-3 (12 M)
Pas. SE2-2
Pas. SE2-3
Pas. E2-3
Pas. F 1-2
Pas. F 1-3
Pas. J5-T (CJ2)
Pas. J7 - T (CJ3)
Pas. J6 - T (CJ4)
Pas. MJ6 - T (CJ4)
Pas. CG105 - 50
Pas. P.12
Pas. P12.C
Pas. P12.C'
Pas. CM5 - 2
Pas. CM2-11
Pas. CM2 - 12
Pas. CM2 - 12A
Pas. CM2-15
Pas. CM3-4
Pas. CM2-11 M
Pas. CM5-3
Pas. CM5-4
Pas. CM5-5
Pas. CM5-6
Pas. CM5-8
Pas. CM5-9
Pas. CM5-12
Pas. CM5-13
Pas. CM5-16
Pas. CM5-20
Pas. CJ5
Pas. CJ6
Pas. CJ6X / SJ6X
Pas. CJ7
Pas. CJ8
Pas. CJ10
Pas. SJ5
Pas. SJ6
Pas. SJ7
Pas. SJ8
Pas. SJ10

SAT
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Hal. 84

NO.
77
78

SNI

KODE
SA1
SA1'

URAIAN PEKERJAAN
Pas. SA1
Pas. SA1'

SAT
Unit
Unit

Hal. 85

NO.
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

SNI

KODE
SA2
SA2'
SA3
SA3'
SA4
SA4'
SA5
SA5'
SA5-1
SA5-1'
SA6
SA6'
B1
B1A
B2
B3
B4
B5
CC1
CC1'
CC1-1
CC1-A
CC.1-A'
CC.2
CC.2'
CC2 - A
CC2-1
CC2 - A'
CC.3
CC.3'
CC 7
CC 7'
CC 7 A
CC 7 A'
CC 8
CC 8 - A
CC 8 A'
SC . 1
SC. 1'
SC . 1 - A
SC 1 - A '
SC 2
SC 2 '
SC2-A
SC2-A'
SC3
SC3'
SC7
SC7'
SC7-A
SC7-A'
SC8
SC8-A
SC8-A'
SC9
SC10
SC 11

URAIAN PEKERJAAN
Pas. SA2
Pas. SA2'
Pas. SA3
Pas. SA3'
Pas. SA4
Pas. SA4'
Pas. SA5
Pas. SA5'
Pas. SA5-1
Pas. SA5-1'
Pas. SA6
Pas. SA6'
Pas. B1
Pas. B1A
Pas. B2
Pas. B3
Pas. B4
Pas. B5
Pas. CC1
Pas. CC1'
Pas. CC1-1
Pas. CC1-A
Pas. CC.1-A'
Pas. CC.2
Pas. CC.2'
Pas. CC2 - A
Pas. CC2-1
Pas. CC2 - A'
Pas. CC.3
Pas. CC.3'
Pas. CC 7
Pas. CC 7'
Pas. CC 7 A
Pas. CC 7 A'
Pas. CC 8
Pas. CC 8 - A
Pas. CC 8 A'
Pas. SC . 1
Pas. SC. 1'
Pas. SC . 1 - A
Pas. SC 1 - A '
Pas. SC 2
Pas. SC 2 '
Pas. SC2-A
Pas. SC2-A'
Pas. SC3
Pas. SC3'
Pas. SC7
Pas. SC7'
Pas. SC7-A
Pas. SC7-A'
Pas. SC8
Pas. SC8-A
Pas. SC8-A'
Pas. SC9
Pas. SC10
Pas. SC 11

SAT
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

Hal. 86

NO.
136
137
138
139
140
141

SNI

KODE
SC12
DC1
DC2
DC3
DC4
DC5

URAIAN PEKERJAAN
Pas. SC12
Pas. DC1
Pas. DC2
Pas. DC3
Pas. DC4
Pas. DC5

SAT
Unit
Unit
Unit
Unit
Unit
Unit
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

Hal. 87

AFTAR HARGA SATUAN PEKERJAAN

HARGA SATUAN
PEKERJAAN
(Rp)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#NAME?
#NAME?
Hal. 88

HARGA SATUAN
PEKERJAAN
(Rp)
#NAME?

Hal. 89

HARGA SATUAN
PEKERJAAN
(Rp)
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Hal. 90

HARGA SATUAN
PEKERJAAN
(Rp)
#REF!
#REF!
#REF!

Hal. 91

HARGA SATUAN
PEKERJAAN
(Rp)
#REF!
#REF!
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
Hal. 92

HARGA SATUAN
PEKERJAAN
(Rp)

Hal. 93

HARGA SATUAN
PEKERJAAN
(Rp)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Hal. 94

HARGA SATUAN
PEKERJAAN
(Rp)

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#NAME?
#REF!

449,010.00
373,176.00
756,562.00
407,042.00
Hal. 95

HARGA SATUAN
PEKERJAAN
(Rp)
655,564.00
570,708.00

Hal. 96

HARGA SATUAN
PEKERJAAN
(Rp)
549,260.00
1,285,490.00
878,839.00
604,484.00
408,993.00
678,484.00
416,764.00
1,146,746.00
757,817.00
221,040.00
197,590.00
237,940.00
214,490.00
254,840.00
231,390.00
263,290.00
239,840.00
251,890.00
225,240.00
250,040.00
250,040.00
301,490.00
274,840.00
435,090.00
408,440.00
412,590.00
328,790.00
443,661.00
417,011.00
435,661.00
647,600.00
611,447.00
209,006.00
210,256.00
29,449.00
18,269.00
685,405.00
696,305.00
#REF!
666,229.00
433,948.00
845,448.00
431,659.00
250,906.00
217,761.00
89,388.00
2,470,825.00
#REF!
566,376.00
67,479.00
325,517.00
270,961.00
853,417.00
461,257.00
#REF!
323,188.00
113,267.00
613,438.00
399,563.00
87,938.00
142,816.00
154,474.00
116,426.00
89,218.00
100,982.00
124,907.00
197,232.00
145,072.00
110,409.00
113,382.00
Hal. 97

HARGA SATUAN
PEKERJAAN
(Rp)
490,326.00
398,779.00

Hal. 98

HARGA SATUAN
PEKERJAAN
(Rp)
835,987.00
743,700.00
580,912.00
469,408.00
1,301,154.00
819,454.00
650,999.00
436,987.00
729,677.00
694,574.00
1,208,881.00
1,068,276.00
1,065,880.00
747,957.00
1,821,535.00
2,585,035.00
3,515,595.00
1,663,783.00
1,217,874.00
1,073,697.00
1,335,659.00
1,338,577.00
1,263,847.00
1,360,999.00
636,097.00
2,530,397.00
3,125,897.00
2,499,309.00
1,657,064.00
1,313,456.00
1,851,868.00
2,274,978.00
2,258,842.00
1,994,637.00
4,406,897.00
5,294,797.00
5,265,394.00
1,162,327.00
1,070,779.00
1,414,677.00
1,263,847.00
1,156,667.00
848,779.00
2,543,847.00
2,422,359.00
1,636,126.00
1,673,118.00
2,326,168.00
2,162,228.00
2,326,442.00
2,068,259.00
3,769,099.00
4,907,206.00
5,282,000.00
1,476,890.00
1,442,390.00
2,789,830.00

Hal. 99

HARGA SATUAN
PEKERJAAN
(Rp)
2,781,657.00
2,881,712.00
7,191,425.00
7,889,232.00
8,241,775.00
3,690,462.00
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

Hal. 100

DINAS PEKERJAAN UMUM


KABUPATEN TEGAL

DAFTAR SATUAN PERALATAN


KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

No.

URAIAN

:
:
:
:

KO
DE

HP

KAP.

ASPHALT MIXING PLANT

E01

294.0

60.0

ASPHALT FINISHER

E02

72.4

10.0

ASPHALT SPRAYER

E03

4.0

850.0

BULLDOZER 100-150 HP

E04

155.0 -

COMPRESSOR 4000-6500 L\M

E05

60.0

5,000.0

CONCRETE MIXER 0.3-0.6 M3

E06

20.0

500.0

CRANE 10-15 TON

E07

138.0

15.0

DUMP TRUCK 3.5 TON

E08

100.0

3.5

DUMP TRUCK 10 TON

E09

190.0

10.0

10

EXCAVATOR 80-140 HP

E10

133.0

0.9

11

FLAT BED TRUCK 3-4 M3

E11

190.0

10.0

12

GENERATOR SET

E12

180.0

135.0

13

MOTOR GRADER >100 HP

E13

135.0

10,800.0

14

TRACK LOADER 75-100 HP

E14

70.0

0.8

15

WHEEL LOADER 1.0-1.6 M3

E15

96.0

1.5

16

THREE WHEEL ROLLER 6-8 T

E16

55.0

8.0

17

TANDEM ROLLER 6-8 T.

E17

82.0

8.1

18

TIRE ROLLER 8-10 T.

E18

100.5

9.0

19

VIBRATORY ROLLER 5-8 T.

E19

82.0

7.1

20

CONCRETE VIBRATOR

E20

5.5

25.0

21

STONE CRUSHER

E21

220.0

60.0

22

WATER PUMP 70-100 mm

E22

23

WATER TANKER 3000-4500 L.

E23

100.0

4,000.0

24

PEDESTRIAN ROLLER

E24

8.8

835.00

25

TAMPER

E25

4.7

121.00

26

JACK HAMMER

E26

0.0

1,330.00

27

FULVI MIXER

E27

345.0

2,005.00

28

CONCRETE PUMP

E28

100.0

8.00

29

TRAILER 20 TON

E29

175.0

20.00

30

PILE DRIVER + HAMMER

E30

25.0

2.50

31

CRANE ON TRACK 35 TON

E31

125.0

35.0

6.0 -

32

WELDING SET

E32

40.0

250.0

33

BORE PILE MACHINE

E33

150.0

2,000.0

34

ASPHALT LIQUID MIXER

E34

5.0

1,000.0

35

TRONTON

E35

150.0

15.0

36

COLD MILLING

E36

248.0

1,000.0

37

ROCK DRILL BREAKER

E37

3.0 -

ANALISA HARGA SATUAN


PROPELERING PENETRASI MAKADAM
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 637a

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Semprotkan aspal tack coat 0,5 l/m3


2. Hampar split 3-5 cm, rata-2 16 m2/m3
3. Hampar agregat 2-3 cm, 60 m2/m3
4. Padatkan masing-2 lapis batu
5. Semprotkan aspal 3,7 l/m3
6. Tabur agregat 1-2 cm, 70 m2/m3
7. Semprot aspal 1,5 l/m2
8. Tabur Bt pch 0,5-1 cm pada 90 m2/m3

1. Menggunakan tenaga manusia


2. Batu pecah dikirim ketempat buruhan oleh levelansir
3. Tebal perkerasan total 7 cm
4. Hasil kerja 2000 m2/minggu (6 hari)

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terlatih
Buruh terlatih
Supir

VOL

HARI

2
2
66
2
1

KODE

3
3
3
3
3

TOTAL VOL
(org.hari)

L03
L04
L101
L104
L06

6
6
198
6
3

U PAH
Rp./hari/orang
75,000.00
65,000.00
45,000.00
60,000.00
60,000.00

PERIODE :
MARET 2015

B IAYA
(Rp.)
450,000.00
390,000.00
8,910,000.00
360,000.00
180,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah mesin 3-5 cm


Batu pecah mesin 2-3 cm
Batu pecah mesin 1-2 cm
Batu pecah mesin 0,5-1 cm
Abu batu
Aspal
Kayu Bakar
Alat bantu

///////////////////
///////////////////

SATUAN

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

m3
m3
m3
m3
m3
kg
m3
set

M10a
M10b
-

TOTAL
VOL

HARGA
(Rp./unit)

62.00
16.60
14.20
11.10
1.00
5,500.00
14.00
8.00

176,860.58
170,588.47
187,314.11
208,221.16
161,083.87
9,155.27
120,000.00
50,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheeld 8-10 T 51 HP

Overhead + Provit

JUMLAH

HARI
KERJA
1

KODE

JAM
KERJA

E16

B IAYA
(Rp. / jam )
15

230,253.72

B IAYA
(Rp.)

70 m3

71,363,315.53
SUB TOTAL
(Rp.)

PERALATAN

3,453,805.78

TOTAL (Rp.)

85,107,121.31

15%

SUB TOTAL
(Rp.)

3,453,805.78

12,766,068.20
JUMLAH

VOLUME/QUANTITY

10,290,000.00

10,965,355.96
2,831,768.60
2,659,860.36
2,311,254.88
161,083.87
50,353,991.86
1,680,000.00
400,000.00

MATERIAL
P E R A LATA N

SUB TOTAL
(Rp.)

Harga Satuan Rp.

1,398,188.42 per m3

97,873,189.51

ANALISA HARGA SATUAN


LAPIS PENETRASI MAKADAM 5 CM ( LAPEN )
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 618a

DISIAPKAN OLEH :
BINA PROGRAM

PERIODE :
MARET 2015

URAIAN :

ANGGAPAN/ASUMSI :

1. Semprotkan aspal tack coat 0,8 l/m3


2. Hamparkan dengan agregat pokok 3-5;25 m2/m3
dan dipadatkan
3. Hamparkan split 2-3;45 m2/m3 dan padatkan
4. Semprotkan aspal (2,5 kg/m2)
5. Hamparkan agregat pengunci 1-2;90 m2/m3
6. Semprotkan aspal 1,5 kg/m2 digilas
7. Taburkan batu pecah 0,5-1 cm rata-2 400 m2/m3

1. Menggunakan tenaga buruh


2. Harga matrial(agregat pokok,agregat pengunci,agregat penutup,aspal adalah
harga dilokasi proyek
3. Volume aspal cair untuk tack coat/prime coat 0,8 l/m2
4. Tebal lapisan penetrasi 5 cm
5. Agregat dikirim sampai tempat buruhan oleh levelansir

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terampil
Buruh terampil
Supir

VOL

HARI

2
2
66
2
1

KODE

3
3
3
3
3

TOTAL VOL
(org.hari)

L03
L04
L101
L104
L06

6
6
198
6
3

U PAH
Rp./hari/orang
75,000.00
65,000.00
45,000.00
60,000.00
60,000.00

B IAYA
(Rp.)
450,000.00
390,000.00
8,910,000.00
360,000.00
180,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah
Batu pecah
Batu pecah
Batu pecah
Abu batu
Aspal
Kayu Bakar
Alat bantu

3-5 cm
2-3 cm
1-2 cm
0,5 - 1 cm

///////////////////
///////////////////

SATUAN

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

m3
m3
m3
m3
m3
kg
m3
set

M10a
M10b
-

TOTAL
VOL

HARGA
(Rp./unit)

52.50
30.60
10.57
9.14
1.22
6,270.00
14.00
8.00

176,860.58
170,588.47
187,314.11
208,221.16
161,083.87
9,155.27
120,000.00
50,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Roller 3 Wheeld 8-10 T 51 HP

Overhead + Provit

JUMLAH

HARI
KERJA
1

KODE

JAM
KERJA

E16

B IAYA
(Rp. / jam )
15

230,253.72

B IAYA
(Rp.)

1400 m2

78,068,312.21
SUB TOTAL
(Rp.)

PERALATAN

3,453,805.78

TOTAL (Rp.)

91,812,117.99

15%

SUB TOTAL
(Rp.)

3,453,805.78

13,771,817.70
JUMLAH

VOLUME/QUANTITY

10,290,000.00

9,285,180.45
5,220,007.18
1,979,910.14
1,903,141.40
196,522.32
57,403,550.72
1,680,000.00
400,000.00
MATERIAL

P E R A LATA N

SUB TOTAL
(Rp.)

Harga Satuan Rp.

75,417.10 per m2

105,583,935.69

ANALISA HARGA SATUAN


LABURAN ASPAL SATU LAPIS ( BURTU )
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 615a

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

PERIODE :
MARET 2015

URAIAN :

ANGGAPAN/ASUMSI :

1. Bersihkan permukaan aspal dari matrial lepas


2. Semprotkan primer aspal cair MC "0"
3. Lapisi permukaan aspal dengan bitumen dan taburkan
split serta digilas

1. Hasil kerja 600 m2/hari


2. Agregat ukuran halus hasil saringan 20 mm dari mesin pemecah batu ditimbun
ditempat buruhan oleh levelansir
3. Permukaan yang dilabur telah selesai digilas dan terikat dengan binder
4. Laburan permukaan menggunakan aspal "MC" 1.0 liter/m2
5. Menggunakan minyak residu = 1,60 liter/m2
6. Agregat halus 1,2 cm disebar

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Supir
Buruh tak terlatih
Buruh semi terlatih
Buruh terlatih

VOL

HARI

1
1
2
15
2
2

KODE

3
3
3
3
3
3

TOTAL VOL
(org.hari)

L03
L04
L06
L101
L103
L104

3
3
6
45
6
6

U PAH
Rp./hari/orang
75,000.00
65,000.00
-45,000.00
50,000.00
60,000.00

B IAYA
(Rp.)
225,000.00
195,000.00
-2,025,000.00
300,000.00
360,000.00
buruh

MAT E R IAL

M
A
T
E
R
I
A
L

Aspal
Kayu Bakar
Batu pecah tersaring
Alat bantu

///////////////////
///////////////////

SATUAN

KODE

///////////////////
///////////////////
///////////////////
///////////////////

kg
m3
m3
set

M10a
M10b
-

TOTAL
VOL

HARGA
(Rp./unit)

3,745.00
14.00
36.00
1.50

9,155.27
120,000.00
327,944.45
50,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T

Peralatan traktor dll


Roller 3 Wheled 8-10 T 51 HP
Asphal Spayer Towed 350 L 7 HP
Dump truck 3,50 Tonne
Wheel Tracktor 60 HP
Chipspreader

JUMLAH

HARI
KERJA
1
1
1
2
1
2

KODE

3
3
3
3
3
3

JAM
KERJA

E16
-

B IAYA
(Rp. / jam )
15
15
15
30
15
30

-230,253.72
-----

3,105,000.00
SUB TOTAL
(Rp.)

34,286,490.82
1,680,000.00
11,806,000.30
75,000.00

MATERIAL
P E R A LATA N

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

47,847,491.12
SUB TOTAL
(Rp.)

-3,453,805.78
-----

A
N

Overhead + Provit

PERALATAN

3,453,805.78

TOTAL (Rp.)

54,406,296.91

15%

8,160,944.54
JUMLAH

VOLUME/QUANTITY

1800 M2

Harga Satuan Rp.

34,759.58 per M2

62,567,241.44

ANALISA HARGA SATUAN


LABURAN ASPAL DUA LAPIS ( BURDA )
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE
K. 617a

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

PERIODE :
MARET 2015

URAIAN :

ANGGAPAN/ASUMSI :

1. Permukaan harus rata kering dan bersih


2. Untuk permukaan jalan yang tak beraspal perlu
prime coat 0,7 liter/m2
3. Menebarkan agregat/batu pecah 1,20 cm dengan
gradasi seragam dua lapis
4. Pemadatan dengan mesin gilas roda baja

1. Kapasitas 450 m2/hari


2. Agregat ukuran 1 - 2 cm dari pemecah batu ditimbun dilokasi buruhan
oleh levelansir
3. Permukaan yang diaspal harus sudah dipadatkan diadakan dibinding disiram
primer aspal cair 1 liter /m2
4. Bitumen residu yang dipakai : lapis 1 sebanyak 1,60 liter/m2
: lapis 2 sebanyak 1,30 liter/m2

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Supir
Buruh tak terlatih
Buruh terlatih
Buruh semi terlatih

VOL

HARI

1
2
2
15
2
2

KODE

4
4
4
4
4
4

TOTAL VOL
(org.hari)

L03
L04
L06
L101
L104
L103

4
8
8
60
8
8

U PAH
Rp./hari/orang
75,000.00
65,000.00
-45,000.00
60,000.00
50,000.00

B IAYA
(Rp.)
300,000.00
520,000.00
-2,700,000.00
480,000.00
400,000.00
buruh

MAT E R IAL

M
A
T
E
R
I
A
L

Batu pecah tersaring


Aspal
Kayu Bakar
Alat bantu

///////////////////
///////////////////

SATUAN

KODE

///////////////////
///////////////////
///////////////////
///////////////////

m3
kg
m3
set

M10a
M10b
M170

TOTAL
VOL

HARGA
(Rp./unit)

54.00
6,085.00
14.00
2.50

327,944.45
9,155.27
120,000.00
50,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

B IAYA
(Rp.)

P
E

Peralatan traktor dll


Roller Wheeed 8-10 T 51 HP

1
1

3
3

E401
E080

15
15

Aspal Spayer Towed 350 L 7 HP

E153

15

--

--

Dump truck 3,50 Tone

E211

15

--

--

L
A
T
A
N

Wheel Tracktor 60 HP
Chipspreader

1
2

3
3

E053
E130

15
30

---

---

Overhead + Provit

-230,253.72

1800 M2

75,223,826.00
SUB TOTAL
(Rp.)

PERALATAN

3,453,805.78

TOTAL (Rp.)

83,077,631.78

15%

SUB TOTAL
(Rp.)

-3,453,805.78

12,461,644.77
JUMLAH

VOLUME/QUANTITY

4,400,000.00

17,709,000.45
55,709,825.54
1,680,000.00
125,000.00

MATERIAL
P E R A LATA N

SUB TOTAL
(Rp.)

Harga Satuan Rp.

53,077.38 per M2

95,539,276.54

ANALISA HARGA SATUAN


KONSTRUKSI LAPIS PONDASI ATAS ( LPB ) TELFORD
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

KODE :
(28)

KODE
K. 516

DISIAPKAN OLEH :
BINA PROGRAM

URAIAN :

ANGGAPAN/ASUMSI :

1. Matrial disiapkan dilokasi buruhan


2. Menghampar pasir setebal 5 cm
3. Batu pecah berukuran 15 - 20 cm
4. Batu pecah yang lebih kecil mengisi rongga diatasnya
sehingga rata kemudian dipadatkan/digilas dengan
mesin gilas

1. Menggunakan tenaga manusia 400 m2 per/hari


2. Matrial -matrial dikirim ke tempat buruhan oleh levelansir
3. Batu sudah dipecah
4. Tanah dasar sudah disiapkan
5. Dipadatkan sampai tebal 20 cm

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terlatih

VOL

HARI

3
1
99

KODE

1
1
1

TOTAL VOL
(org.hari)

L03
L04
L101

U PAH
Rp./hari/orang

3
1
99

75,000.00
65,000.00
45,000.00

PERIODE :
MARET 2015

B IAYA
(Rp.)
225,000.00
65,000.00
4,455,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Batu belah uk. 15 - 20 cm


Batu pecah tangan uk. 5 - 7 cm
Pasir urug
Alat bantu

///////////////////
///////////////////

SATUAN

KODE

///////////////////
///////////////////
///////////////////
///////////////////

m3
m3
m3
set

M06
M44
-

TOTAL
VOL

HARGA
(Rp./unit)

50.00
20.00
30.00
4.00

195,400.00
165,000.00
132,400.00
50,000.00

B IAYA
(Rp.)

Roller 3 Wheled 8-10 T 51 HP

JUMLAH

HARI
KERJA
1

KODE

JAM
KERJA

E16

B IAYA
(Rp. / jam )
5

230,253.72

4,745,000.00
SUB TOTAL
(Rp.)

9,770,000.00
3,300,000.00
3,972,000.00
200,000.00

MATERIAL
P E R A LATA N

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

17,242,000.00
SUB TOTAL
(Rp.)

1,151,268.59

E
R
A
L
A
T
A
N

Overhead + Provit

15%
JUMLAH

VOLUME/QUANTITY

80 M3

Harga Satuan Rp.

332,612.61 m3

PERALATAN

1,151,268.59

TOTAL (Rp.)

23,138,268.59
3,470,740.29
26,609,008.88

ANALISA HARGA SATUAN


MEMBUAT CAMPURAN, MENGHAMPAR DAN PEMADATAN LATASIR 2 CM
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Suplier mengirim matrial sampai bin spreader
2. Matrial dihampar dengan spreader dan dipadatkan
dengan mesin gilas roda baja

PEKERJA

P
E
K
E
R
J
A

Mandor
Operator terlatih
Buruh tak terlatih
Buruh semi terlatih

KODE :
(28)

KODE
K. 621b

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
MARET 2015

ANGGAPAN/ASUMSI :
1. Menggunakan tenaga buruh 400 m2/hari
2. Pasir aspal dikirim oleh levelansier ketempat buruhan
3. Rata - rata tebal lapisan padat berkisar antara 1,5 cm s/d 2 cm

VOL

HARI

1
1
25
10

KODE

1
1
1
1

TOTAL VOL
(org.hari)

L03
L04
L101
L103

U PAH
Rp./hari/orang

1
1
25
10

75,000.00
65,000.00
45,000.00
50,000.00

B IAYA
(Rp.)
75,000.00
65,000.00
1,125,000.00
500,000.00

buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Aspal untuk campuran


Batu pecah mesin 0.5
Abu batu (filler)
Aspal untuk prime coat
Kayu bakar
Alat bantu

///////////////////
///////////////////

SATUAN

KODE

///////////////////
///////////////////
///////////////////
///////////////////
///////////////////
///////////////////

kg
m3
m3
kg
m3
set

M10a
M10a
M10b
-

TOTAL
VOL

HARGA
(Rp./unit)

1,371.40
6.86
1.57
100.57
14.00
1.00

9,155.27
208,221.16
161,083.87
9,155.27
120,000.00
50,000.00

B IAYA
(Rp.)

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

Roller 3 Wheled 8-10 T 51 HP

E16

Aspal Sprayer Towed 350 L 7 HP

230,253.72

Overhead + Provit

B IAYA
(Rp.)

400 M2

SUB TOTAL
(Rp.)

PERALATAN

1,151,268.59

TOTAL (Rp.)

19,803,852.04

15%

16,887,583.45

--

2,970,577.81
JUMLAH

VOLUME/QUANTITY

SUB TOTAL
(Rp.)

1,151,268.59

--

R
A
L
A
T
A
N

1,765,000.00

12,555,538.99
1,428,397.16
252,901.68
920,745.63
1,680,000.00
50,000.00

MATERIAL
P E R A LATA N

SUB TOTAL
(Rp.)

Harga Satuan Rp.

56,936.07 per M2

22,774,429.85

ANALISA HARGA SATUAN


PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :
1. Mengupas dan membuang semak - semak dengan
tenaga manusia pada DMJ (Daerah milik jalan )

PEKERJA

P
E
K
E
R
J
A

Mandor
Buruh tak terlatih

KODE :
(28)

KODE
K. 210

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
MARET 2015

ANGGAPAN/ASUMSI :
1. Menngunakan tenaga manusia (9 m x 100 m/hari
2. Hasil kerja 25 m2/orang hari
3. Menggunakan alat bantu rata-rata 1 bulan orang
4. Bakarlah sampah ditempat buruhan

VOL

HARI

1
36

KODE

1
1

TOTAL VOL
(org.hari)

L03
L101

1
36

U PAH
Rp./hari/orang
75,000.00
45,000.00

B IAYA
(Rp.)
75,000.00
1,620,000.00

buruh
MAT E R IAL

M
A
T
E
R

Alat bantu

///////////////////
///////////////////

SATUAN

KODE

///////////////////

set

TOTAL
VOL
1.50

HARGA
(Rp./unit)
50,000.00

SUB TOTAL
(Rp.)

B IAYA
(Rp.)

1,695,000.00
SUB TOTAL
(Rp.)

75,000.00

I
A
L
MATERIAL
P E R A LATA N

JUMLAH

HARI
KERJA

KODE

JAM
KERJA

B IAYA
(Rp. / jam )

P
E
R
A
L
A
T
A
N

Overhead + Provit

15%

900 m2

SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

1,770,000.00
265,500.00

JUMLAH
VOLUME/QUANTITY

B IAYA
(Rp.)

75,000.00

Harga Satuan Rp.

2,035,500.00
2,261.67 m2

ANALISA HARGA SATUAN


PELAPISAN PRIME COAT
( MENGGUNAKAN BURUH )
PROPINSI :
JAWA TENGAH

KODE :
(33)

KABUPATEN :
TEGAL

URAIAN :

KODE
K. T04

KODE :
(28)

DISIAPKAN OLEH :
BINA PROGRAM

TANGGAL :
MARET 2015

ANGGAPAN/ASUMSI :
1. Permukaan yang akan diprime coat sudah dipadatkan terlebih dahulu
2. Semprotkan campuran prime coat 2 lt/m2
3. Biarkan permukaan yang sudah diprime coat minimal 24 jam, dan dijaga
jangan dilewati kendaraan atau kena hujan

PEKERJA

VOL

HARI

KODE

TOTAL VOL
(org.hari)

U PAH
Rp./hari/orang

B IAYA
(Rp.)

P
E
K

Mandor
Operator
Buruh semi terlatih

1
1
4

1
1
1

L03
L04
L103

1
1
4

75,000.00
65,000.00
50,000.00

75,000.00
65,000.00
200,000.00

Buruh tak terlatih

L 101

45,000.00

90,000.00

SUB TOTAL
(Rp.)

R
J
A
buruh
MAT E R IAL

M
A
T
E
R
I
A
L

Aspal curah
Minyak aspal
Kayu Bakar
Alat bantu

///////////////////
///////////////////

SATUAN

KODE

///////////////////
///////////////////
///////////////////
///////////////////

Kg
Lt
m3
Set

M10
M11
M10b
-

TOTAL
VOL

HARGA
(Rp./unit)

640.00
320.00
2.50
2.00

7,631.33
6,500.00
120,000.00
50,000.00

B IAYA
(Rp.)

P
E
R
A
L
A
T
A
N

Asphal spreyer

JUMLAH

HARI
KERJA
1

Overhead + Provit

KODE

JAM
KERJA

E03

B IAYA
(Rp. / jam )

B IAYA
(Rp.)

--

--

15%

800 m2

7,364,048.90
SUB TOTAL
(Rp.)

PERALATAN

0.00

TOTAL (Rp.)

7,794,048.90
1,169,107.33

JUMLAH
VOLUME/QUANTITY

SUB TOTAL
(Rp.)

4,884,048.90
2,080,000.00
300,000.00
100,000.00

MATERIAL
P E R A LATA N

430,000.00

Harga Satuan Rp.

11,203.95 m2

8,963,156.23

DAFTAR HARGA BAHAN


KEGIATAN
PEKERJAAN
LOKASI
TA

NO
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

URAIAN

SAT.

BAHAN DASAR
Abu Batu
Batu Bata 3 x 11 x 22 (20)
Bata Hebel (10x20x40)
Batako Berlubang Hollow Blok HB-20
Batako Berlubang Hollow Blok HB-15
Batako Berlubang Hollow Blok HB-10
Batu kali pecah
Batu Blonos
Batu pecah dg mesin (0,5-<1 cm) (Screening)
Batu pecah dg mesin (1-2cm)
Batu pecah dg mesin (2-3 cm)
Batu pecah dg mesin (3-5 cm)
Batu pecah dg tangan (5-7 cm)
Batu pecah dg mesin (2/3 cm) per kg
Batu/Kerikil Pecah Tersaring
Filler
Kerikil Sungai
Pasir
Pasir (Harga pasir per kg)
Pasir Urug
Pasir Beton
PC Semen Abu - abu ( 50 Kg )
PC Semen Warna ( 40 Kg )
Mortar Perekat Hebel (40 kg) setara MU-380
Sirtu
Tanah Urug

M3
Bh
Bh
Bh
Bh
Bh
M3
M3
M3
M3
M3
M3
M3
Kg
M3
Kg
M3
M3
Kg
M3
M3
Kg
Kg
zak
M3
M3

PENUTUP ATAP
Asbes Gelombang (3,00x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (2,70x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (2,40x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (2,10x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (1,50x1,05)x4 mm (gelombang kecil)
Asbes Gelombang (2,50x0,92)x5 mm
Asbes Gelombang (2,25x0,92)x5 mm
Asbes Gelombang (2,00x0,92)x5 mm
Asbes Gelombang (1,80x0,92)x5 mm
Asbes Gelombang (2,40x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (2,10x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (1,80x1,08)x6 mm (gelombang kecil)
Asbes Gelombang (2,40x0,8)x3,5 mm (gelombang kecil)
Asbes Gelombang (2,10x0,8)x3,5 mm (gelombang kecil)
Asbes Gelombang (1,80x0,8)x3,5 mm (gelombang kecil)
Bubungan Asbes gelombang besar
Bubungan Asbes gelombang kecil
Bubungan Genteng keramik "KIA"
Bubungan Genteng Morando
Bubungan genteng pres jtw isi 4/m2

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m'
m'
Bh
Bh
Bh

HARGA SATUAN
(Rp)
161,083.87
1,000.00
12,000.00
2,100.00
1,800.00
1,620.00
195,400.00
176,200.00
208,221.16
187,314.11
170,588.47
176,860.58
165,000.00
121.85
327,944.45
1,400.00
103,200.00
158,300.00
117.26
132,400.00
174,500.00
1,500.00
2,300.00
155,000.00
122,900.00
104,700.00
77,700.00
84,400.00
43,200.00
59,000.00
33,500.00
92,166.67
83,083.33
71,875.00
58,583.33
42,200.00
41,100.00
33,350.00
43,600.00
40,400.00
37,000.00
34,000.00
27,800.00
9,500.00
4,800.00
4,860.00

NO
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
42
43
44
45
46
47
48
49
50
III.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

URAIAN

SAT.

Bubungan genteng pres kebumen


Bubungan genteng kodok
Bubungan genteng kodok glazur
Bubungan genteng plentong
Bubungan genteng plentong super / besar
Nok Genteng Beton
Nok Genteng Metal
Genteng Keramik Glazur KIA isi 15/m2 warna muda
Genteng Keramik Glazur KIA isi 14/m2 warna tua
Genteng Morando Glazur isi 20/m2 1550x20
Genteng Pres Jatiwangi isi 25/m2 750x25
Genteng Pres Kebumen
Genteng Morando Natural isi 20/m2 oven 950x20
Genteng plentong
Genteng plentong super
Genteng kodok
Genteng kodok glazur
Genteng asbes
Genteng Beton
Genteng Beton Warna
Genteng Metal
Atap Sirap
Klem Wuwungan
Glass Block
Seng BJLS 30, Uk. 180 cm
Seng BJLS 20, Uk. 180 cm
Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 24
Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 28
Seng Plat BJLS 20
Seng Plat BJLS 30
Seng BJLS 20, uk 90 cm

Bh
Bh
Bh
Bh
Bh
Bh
bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
bh
bh
bh
bh
Bh
Bh
M'
Lbr
M'
Lbr
M2
M3
M'

BAHAN KAYU
Bambu
Kayu Bakar
Kayu bengkir 6/14 cm
Kayu bengkir 6/12 cm
Kayu Bengkir 5/7 cm
Kayu Bengkir 8/12 cm
Kayu Bengkir 4/6 cm
Kayu Bengkir 3/20 cm
Kayu Bengkir 10/20 cm
Kayu Papan bengkirai 2x20x400
Kayu Papan jati
Kayu Jati 8/20 cm (perum)
Kayu Jati 3/20 cm (perum)
Kayu Jati 6/14 cm (perum)
Kayu Jati 5/7 cm (perum)
Kayu Jati 2/3 cm (perum)
Kayu Jati 8/20 cm (rakyat)
Kayu Jati 3/20 cm (rakyat)
Kayu Jati 6/14 cm (rakyat)
Kayu Jati 5/7 cm (rakyat)
Kayu Jati 2/3 cm (rakyat)
Kayu Papan kempas
Kayu Kempas 8/12

Btg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

HARGA SATUAN
(Rp)
4,850.00
4,000.00
4,500.00
4,000.00
4,700.00
5,500.00
77,000.00
7,000.00
6,850.00
4,500.00
2,400.00
2,650.00
3,100.00
2,150.00
3,300.00
2,850.00
3,350.00
31,100.00
4,350.00
6,525.00
80,300.00
1,400.00
20,100.00
47,500.00
41,350.00
34,000.00
43,750.00
22,850.00
33,650.00
25,000.00
14,250.00
120,000.00
11,954,800.00
10,466,700.00
7,250,000.00
10,158,400.00
6,994,500.00
12,133,400.00
12,050,000.00
11,925,000.00
10,826,400.00
10,775,200.00
10,540,400.00
10,540,400.00
10,540,400.00
10,540,400.00
10,540,400.00
6,592,550.00
6,885,500.00
6,031,062.50
6,095,000.00
5,750,000.00
5,512,300.00

NO
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
IV.
1
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

URAIAN
Kayu Kempas 6/12
Kayu Kempas 3/20
Kayu Kempas 5/7
Kayu Kempas 4/6
Kayu Kempas 3/5
Kayu Kempas 2/3
Kayu Meranti 5/7
Kayu Meranti 4/6
Kayu Meranti 3/5
Kayu Meranti 2/3
Kayu Papan kruing
Kayu Kruing 8/12
Kayu Kruing 6/12
Kayu Kruing 3/20
Kayu Kruing 5/7
Kayu Kruing 4/6
Kayu Kruing 3/5
Kayu Kruing 2/3
Kayu Papan Cetak Pinus
Kayu Stoot ( bambu ) 5 mtr
Kayu Lokal 5/7
Kayu Lokal 4/6
Kayu Lokal 2/3
Kayu Lokal Papan
Dolken kayu lokal
Dolken Kayu 8-10/400 cm
BAHAN PENUTUP DINDING / LANTAI
Batu segi 6 tebal 10 cm abu - abu kecil
Batu segi 6 tebal 10 cm abu - abu sedang
Batu segi 6 tebal 10 cm abu - abu besar
Batu Tempel Sukabumi hijau
Batu Tempel Palimanan kuning
Batu Tempel ( Tidak Beraturan ) kecil
Batu Tempel ( Tidak Beraturan ) besar
Batu Candi 20/20, 5/20
Batu Susun sirih Andesit (Jabar) 3x30x1,3 cm
Batu Susun sirih Templek
Batu Andesit (Candi Jawa Barat) 15x30cm Bakar
Batu Andesit (Candi Jawa Barat) 15x30cm Mesin
Batu Candi 20/40
Batu Candi 15/30
Granito Uk. 40 x 40 cm
Granito Uk. 40 x 40 cm
6bh / duz
Granito Uk. 30 x 30 cm
Granito Uk. 30 x 30 cm
Granito Uk. 60 x 60 cm
Granito Uk. 60 x 60 cm
3bh / duz
Plint Granito 10 x 30 cm
Plint Granito 10 x 40 cm
Keramik 20/25, putih
Keramik 20/25, warna
Keramik 20/25, warna (bisa untuk dinding)
Keramik 20/20, anti slip ( u/.lantai Km/wc)
Keramik 20/20, anti slip ( u/.lantai Km/wc)
Keramik 20/20, warna

SAT.
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Btg
M3
M3
M3
M3
M3
Btg

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
buah
M2
buah
M2
buah
buah
buah
M2
M2
buah
M2
buah
M2

HARGA SATUAN
(Rp)
5,258,400.00
6,246,700.00
4,354,300.00
4,072,400.00
5,100,000.00
3,538,900.00
3,110,000.00
2,940,000.00
3,025,000.00
2,940,000.00
6,350,000.00
6,470,000.00
6,350,000.00
7,190,000.00
4,730,000.00
4,470,000.00
5,575,000.00
4,470,000.00
2,722,400.00
8,000.00
1,145,500.00
1,863,300.00
2,672,200.00
1,469,000.00
1,540,000.00
19,900.00
112,400.00
95,300.00
119,100.00
120,000.00
146,000.00
128,400.00
190,900.00
185,000.00
185,000.00
127,000.00
117,000.00
169,300.00
28,216.67
125,000.00
11,363.64
189,000.00
63,000.00
3,850.00
4,400.00
53,100.00
54,600.00
2,730.00
54,600.00
2,184.00
53,750.00

NO
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
V.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
17
18
19
VI.
1
2
3
4
5
6
7
8
9
10
11
12

URAIAN
Keramik 20/20, warna (bisa untuk dinding)
Keramik 10/20, warna
Keramik 10/20, warna
Keramik 30/30 (putih polos)
Keramik 30/30 (putih polos)
Keramik 30/30, warna
Keramik 40/40, (putih polos)
Keramik 40/40, (putih polos)
Keramik 40/40, warna
Keramik 40/40, Anti Slip
Keramik Uk. 5 x 20 cm Plint
Keramik Uk. 10 x 20 cm Plint
Keramik Uk. 10 x 30 cm Plint
Keramik Uk. 10 x 40 cm Plint
Keramik Anti Slip 30x30
Keramik lis Uk. 7 x 20
Keramik lis Uk. 7 x 30
Keramik lis Uk. 13 x 40
Keramik kuku macan
Wallpaper

SAT.

HARGA SATUAN
(Rp)

buah
M2
buah
M2
buah
M2
M2
buah
M2
M2
Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
M'
m2

BAHAN CETAK
Buis Beton 1/2 dia 20 cm
Buis Beton 1/2 dia 30 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Buis Beton 80 cm
Paving Block tebal 6 cm abu - abu K175 (Sekelas Muntilan)
Paving Block tebal 6 cm warna K175 (Sekelas Muntilan)
Paving Block tebal 8 cm abu - abu K175 (Sekelas Muntilan)
Paving Block tebal 8 cm warna K175 (Sekelas Muntilan)
Paving Block tebal 6 cm abu - abu lokal
Paving Block tebal 6 cm warna lokal
Rooster bata
Kansteen beton 10.20.50
Kansteen beton 8.10.25.50
Kansteen beton 8.15.30.50
Kansteen beton 8.15.30.50
Kansteen beton taman

m'
m'
m'
m'
m'
m'
m'
m'
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh

BAHAN BESI DAN ALUMINIUM


Besi Beton polos
Besi Beton ulir
Besi Profil IWF
Besi Profil Siku / U
Besi Profil kanal CNP
Profil Aluminium T
Ramset / Dina Bolt
Besi Strip ( tebal 5mm, lebar 5 cm )
Besi plat bordes T = 2,3 mm (1,2 m' x 2,4 m')
Besi plat bordes T = 3 mm (1,2 m' x 2,4 m')
Besi plat bordes T = 5 mm (1,2 m' x 2,4 m')
Besi plat bordes T = 6 mm (1,2 m' x 2,4 m')

Kg
Kg
Kg
Kg
Kg
m'
bh
Kg
lbr
lbr
lbr
lbr

2,150.00
55,000.00
1,100.00
48,000.00
4,400.00
51,500.00
52,200.00
8,700.00
56,200.00
59,500.00
2,750.00
5,000.00
16,000.00
13,500.00
56,600.00
4,150.00
9,000.00
10,000.00
6,000.00
64,800.00
38,000.00
45,000.00
50,000.00
66,250.00
110,000.00
115,000.00
120,000.00
130,000.00
75,000.00
85,000.00
90,000.00
98,000.00
65,000.00
68,000.00
14,000.00
15,000.00
22,500.00
#
29,500.00
25,500.00
9,100.00
9,250.00
11,500.00
9,850.00
10,000.00
18,000.00
7,920.00
8,200.00
920,000.00
1,280,000.00
1,676,000.00
2,054,000.00

NO
13
14
15
16
17
18
19
20
21
22
23
VII.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
A.

URAIAN

SAT.

Besi Hollow 2x 4 cm, tbl. 2mm Pjg 6 m


Besi Hollow 2x 4 cm, tbl. 2mm Pjg 6 m
Besi Hollow 3 x 3 cm, tbl. 2mm Pjg 6 m
Besi Hollow 3 x 3 cm, tbl. 2mm Pjg 6 m
Besi Hollow Panjang 6 m (Semua ukuran)
Kawat Las Listrik
Kawat Beton
Kawat Bronjong d4mm galvanis
Kusen Aluminium uk. 4"
Plat alumunium 0,6 mm
Plat alumunium ( Aluminium Sheet ) 0,3 mm
BAHAN PIPA DAN PIPA
Knee Galvanis 1/2"
Knee Galvanis 3/4"
Knee Galvanis 1"
Knee Galvanis 11/2"
Knee Galvanis 2"
Knee Galvanis 2 1/2"
Knee Galvanis 3"
Knee Galvanis 4"
Overstock Galvanis 1" x 3/4"
Knee PVC 1/2"
Knee PVC 3/4"
Knee PVC 1"
Knee PVC 1 1/2"
Knee PVC 2"
Knee PVC 2 1/2"
Knee PVC 3" ( AW )
Knee PVC 4" ( AW )
Knee pipa pVC (hitam) 4"
Pipa PVC 1/2"
Pipa PVC 3/4"
Pipa PVC 1"
Pipa PVC 1 1/2"
Pipa PVC 2"
Pipa PVC 2 1/2"
Pipa PVC 3" ( AW )
Pipa PVC 4" ( AW )
Pipa PVC ( hitam ) 4"
Klem PVC 3/4" AW
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 11/2"
Pipa Galvanis 2"
Pipa Galvanis 2 1/2"
Pipa Galvanis 3"
Pipa Galvanis 4"
Pipa : Runcing dia 3/4"
Pipa : BC dia 50 mm2
Pipa : Klem BC dia 50 mm2
Pipa : Sepatu Kabel dia 50 mm2
Seal tape
PIPA AIR BERSIH
PIPA PVC ( S - 12,5 )

AIR

m'
Kg
m'
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
BERSIH
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
M'
M'
M'
M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
9,650.00
12,800.00
9,650.00
12,800.00
12,800.00
30,000.00
15,800.00
21,700.00
98,500.00
50,000.00
46,000.00
5,000.00
7,700.00
12,200.00
23,300.00
41,100.00
62,700.00
90,700.00
166,800.00
10,200.00
3,000.00
3,200.00
4,300.00
5,150.00
5,300.00
6,299.75
9,785.00
16,267.14
13,528.17
10,700.00
12,800.00
17,300.00
23,300.00
21,000.00
28,100.00
40,700.00
64,300.00
16,900.00
3,100.00
30,600.00
42,800.00
55,100.00
67,400.00
79,600.00
120,200.00
203,200.00
283,450.00
226,000.00
73,000.00
9,800.00
10,350.00
3,023.13
-

NO
1
2
3
4
5
6
7
8
B.
1
2
3
4
5
6
7
8
9
10
11
12
C.
1
2
3
4
5
6
7
8
9
D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

URAIAN
Pipa uPVC 1" ( S - 12,5 )
Pipa uPVC 1 1/2" ( S - 12,5 )
Pipa uPVC 2" ( S - 12,5 )
Pipa uPVC 3" ( S - 12,5 )
Pipa uPVC 4" ( S - 12,5 )
Pipa uPVC 6" ( S - 12,5 )
Pipa uPVC 8" ( S - 12,5 )
Pipa uPVC 10" ( S - 12,5 )
PIPA POLYETYLINE ( PE - PN. 10 - SDR 17 )
Pipa PE 1"
Pipa PE 1 1/4"
Pipa PE 1 1/2"
Pipa PE 2"
Pipa PE 2 1/2"
Pipa PE 3"
Pipa PE 4"
Pipa PE 5"
Pipa PE 6"
Pipa PE 8"
Pipa PE 9"
Pipa PE 10"
PIPA MEDIUM GALVANIZED
Pipa Medium Galvanized 1/2 "
Pipa Medium Galvanized 3/4 "
Pipa Medium Galvanized 1 "
Pipa Medium Galvanized 1 1/2 "
Pipa Medium Galvanized 2 "
Pipa Medium Galvanized 3 "
Pipa Medium Galvanized 4 "
Pipa Medium Galvanized 6 "
Pipa Medium Galvanized 8 "
ACCESSORIES PIPA
Fitting PVC DN 63 x 63 mm
Fitting PVC DN 90 x 90 mm
Fitting PVC DN 90 x 63 mm
Fitting PVC DN 110 x 110 mm
Fitting PVC DN 110 x 90 mm
Fitting PVC DN 110 x 63 mm
Fitting PVC DN 160 x 160 mm
Fitting PVC DN 160 x 110 mm
Fitting PVC DN 160 x 90 mm
Fitting PVC DN 160 x 63 mm
Fitting PVC DN 200 x 200 mm
Fitting PVC DN 200 x 160 mm
Fitting PVC DN 200 x 110 mm
Fitting PVC DN 200 x 90 mm
Fitting PVC DN 250 x 250 mm
PVC Reducer Socket RR Joint uk. DN 90 x 63 mm
PVC Reducer Socket RR Joint uk. DN 110 x 90 mm
PVC Reducer Socket RR Joint uk. DN 110 x 63 mm
PVC Reducer Socket RR Joint uk. DN 160 x 110 mm
PVC Reducer Socket RR Joint uk. DN 200 x 160 mm
PVC Reducer Socket RR Joint uk. DN 250 x 200 mm
Long Bend All Socket RR Joint 90 DN. 63 mm
Long Bend All Socket RR Joint 90 DN. 75 mm
Long Bend All Socket RR Joint 90 DN. 90 mm

SAT.
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
9,700.00
19,650.00
29,000.00
60,550.00
88,850.00
190,000.00
296,800.00
468,200.00
13,500.00
13,950.00
22,100.00
33,850.00
53,900.00
75,600.00
161,500.00
207,600.00
207,600.00
299,000.00
531,300.00
822,950.00
66,100.00
56,350.00
93,200.00
132,000.00
183,000.00
307,900.00
467,700.00
678,000.00
1,032,000.00
159,300.00
251,000.00
223,100.00
418,350.00
378,200.00
339,100.00
772,700.00
670,450.00
605,000.00
520,600.00
1,783,000.00
1,601,200.00
1,326,600.00
1,377,100.00
1,245,200.00
61,100.00
86,000.00
87,200.00
167,300.00
268,900.00
527,900.00
37,300.00
50,200.00
73,500.00

NO
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

URAIAN
Long Bend All Socket RR Joint 90 DN. 110 mm
Long Bend All Socket RR Joint 90 DN. 140 mm
Long Bend All Socket RR Joint 90 DN. 160 mm
Long Bend All Socket RR Joint 90 DN. 200 mm
Long Bend All Socket RR Joint 90 DN. 250 mm
Long Bend All Socket RR Joint 45 DN. 63 mm
Long Bend All Socket RR Joint 45 DN. 75 mm
Long Bend All Socket RR Joint 45 DN. 90 mm
Long Bend All Socket RR Joint 45 DN. 110 mm
Long Bend All Socket RR Joint 45 DN. 140 mm
Long Bend All Socket RR Joint 45 DN. 160 mm
Long Bend All Socket RR Joint 45 DN. 200 mm
Long Bend All Socket RR Joint 45 DN. 250 mm
Long Bend All Socket RR Joint 22,5 DN. 63 mm
Long Bend All Socket RR Joint 22,5 DN. 75 mm
Long Bend All Socket RR Joint 22,5 DN. 90 mm
Long Bend All Socket RR Joint 22,5 DN. 110 mm
Long Bend All Socket RR Joint 22,5 DN. 140 mm
Long Bend All Socket RR Joint 22,5 DN. 160 mm
Long Bend All Socket RR Joint 22,5 DN. 200 mm
Long Bend All Socket RR Joint 22,5 DN. 250 mm
Flanges Socket RR Joint DN. 63 mm
Flanges Socket RR Joint DN. 90 mm
Flanges Socket RR Joint DN. 110 mm
Flanges Socket RR Joint DN. 160 mm
Flanges Socket RR Joint DN. 200 mm
Flanges Socket RR Joint DN. 250 mm
CI Gte Valve Flanged Flat Body "AFT" 40 mm
CI Gte Valve Flanged Flat Body "AFT" 50 mm
CI Gte Valve Flanged Flat Body "AFT" 80 mm
CI Gte Valve Flanged Flat Body "AFT" 100 mm
CI Gte Valve Flanged Flat Body "AFT" 150 mm
CI Gte Valve Flanged Flat Body "AFT" 200 mm
CI Gte Valve Flanged Flat Body "AFT" 250 mm
Giboult Joint Cast Iron PN. 10 uk. 50 mm
Giboult Joint Cast Iron PN. 10 uk. 80 mm
Giboult Joint Cast Iron PN. 10 uk. 100 mm
Giboult Joint Cast Iron PN. 10 uk. 150 mm
Giboult Joint Cast Iron PN. 10 uk. 200 mm
Giboult Joint Cast Iron PN. 10 uk. 250 mm
Tangki air (Hidran Umum) uk. 1000 ltr
Tangki air (Hidran Umum) uk. 2000 ltr
Tangki air (Hidr Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )
All Flange Tee u Cast Iron ( CI )

SAT.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
138,200.00
213,800.00
320,200.00
650,900.00
1,182,400.00
38,200.00
42,500.00
64,200.00
102,900.00
169,750.00
276,900.00
459,100.00
851,500.00
28,600.00
37,300.00
55,500.00
87,500.00
140,500.00
235,600.00
391,500.00
686,000.00
113,100.00
156,100.00
195,200.00
329,100.00
516,100.00
803,100.00
989,500.00
1,095,800.00
1,593,900.00
2,125,200.00
3,453,450.00
5,512,200.00
8,301,500.00
237,000.00
285,500.00
342,600.00
541,900.00
670,700.00
890,900.00
3,187,800.00
6,508,425.00
7,438,200.00
317,500.00
454,700.00
526,900.00
541,300.00
577,500.00
815,600.00
830,100.00
858,900.00
945,700.00
1,219,900.00
1,248,800.00
1,321,000.00
1,443,800.00

NO
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

URAIAN
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend Cast Iron ( CI )
All Flange Bend 45 uk. 250 mm
All Flange Reducer uk. 80 x 50 mm
All Flange Reducer uk. 100 x 50 mm
All Flange Reducer uk. 100 x 80 mm
All Flange Reducer uk. 150 x 80 mm
All Flange Reducer uk. 150 x 100 mm
All Flange Reducer uk. 200 x 75 mm
All Flange Reducer uk. 200 x 100 mm
All Flange Reducer uk. 200 x 150 mm
All Flange Reducer uk. 250 x 75 mm
All Flange Reducer uk. 250 x 100 mm
All Flange Reducer uk. 250 x 150 mm
All Flange Reducer uk. 250 x 200 mm
Wall Pipe uk. 100 x 0.50 mm
Wall Pipe uk. 150 x 0.50 mm
Wall Pipe uk. 200 x 0.50 mm
Wall Pipe uk. 250 x 0.50 mm
Giboult Joint uk. 50 mm
Giboult Joint uk. 75 mm
Giboult Joint uk. 100 mm
Giboult Joint uk. 150 mm
Giboult Joint uk. 200 mm
Giboult Joint uk. 250 mm
Bend All Socket 90 uk. 50 mm
Bend All Socket 90 uk. 100 mm
Bend All Socket 90 uk. 150 mm
Bend All Socket 90 uk. 200 mm
Bend All Socket 90 uk. 250 mm
Air Relief Valve ( CI ) DN 50 mm
Air Relief Valve ( CI ) DN 80 mm
Air Relief Valve ( CI ) DN 100 mm
Air Relief Valve ( CI ) DN 150 mm
Air Relief Valve ( CI ) DN 200 mm

VIII. B A H A N L A N G I T - L A N G I T
1 Asbes Plat tebal 6 mm (1,00 x 1,00)
2 Bilik bambu
3 Eternit 1 x 1 m2 t = 4 mm Djabesmen / harflex
4 Eternit (saflex) 1 x 1 m2, t = 5 mm
5 Gypsum uk. 1,2 x 2,4 tebal 9mm
6 Akustik (60x120)
7 Lis gypsum
8 Lis kayu profil
9 Lis kayu 2/4
10 Teakwood 0,9 x 2,1 t = 3 mm

SAT.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Lbr
M2
m2
m2
Lbr
Lbr
m'
M'
M'
Lbr

HARGA SATUAN
(Rp)
216,500.00
317,500.00
404,000.00
721,900.00
996,100.00
1,443,800.00
223,800.00
332,000.00
404,100.00
692,900.00
1,025,000.00
1,530,100.00
252,650.00
274,200.00
288,750.00
498,000.00
526,900.00
613,600.00
649,600.00
685,700.00
887,900.00
901,800.00
938,400.00
1,032,300.00
822,900.00
1,155,000.00
1,790,200.00
2,324,400.00
180,500.00
274,200.00
345,200.00
541,300.00
810,800.00
1,176,600.00
454,700.00
456,600.00
721,900.00
1,624,100.00
2,526,500.00
1,713,400.00
1,177,900.00
4,316,800.00
8,633,600.00
13,402,000.00
18,500.00
49,000.00
17,000.00
15,300.00
57,900.00
146,080.00
19,400.00
7,900.00
4,600.00
154,000.00

NO
11
11
11
12
13
14
15
16
17
18

URAIAN

SAT.

Teakwood 0,9 x 2,1 t = 4 mm


Teakwood 1,2 x 2,4 t = 3 mm
Teakwood 1,2 x 2,4 t = 6 mm
Teakwood 1,9 x 2,4 t = 3 mm
Triplek 1.2 x 2.4 tbl = 3 mm
Triplek 1.2 x 2.4 tbl = 4 mm
Triplek 1.2 x 2.4 tbl = 6 mm
Triplek 1.2 x 2.4 tbl = 9 mm
Triplek 0.9 x 2.1 uk pintu tbl 4 mm
Triplek 0.9 x 2.1 uk pintu tbl 3 mm

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

IX.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

BAHAN FINISHING
Amplas
Coating Heritage alami
Dempul kayu
Plamur Kayu
Plamur tembok
Cat Besi
Cat Kayu
Cat Tembok
Cat Tembok (setara Catylac)
Cat Tembok exterior
Flinkote
Kuas 3"
Kuas 2"
Lem kayu
Lem Kuning
Lem Putih
Lem Vinyl
Lem Perekat Wallpaper
Oker Putih
Oker Warna
Melamik
Menie Besi
Menie kayu
Minyak Cat
Politur
Politur Jadi
Residu
Rol Cat
Sirlak
Spiritus
Teer
Sirlak
Spiritus
Teer
Teak oil
Vernis
Vernis Batu alam

Lbr
Ltr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Kg
Kg
Ltr
Ltr
Kg
Ltr
Bh
Ltr
Kg
Bh
Ltr
Kg
Bh
Kg
Ltr
Ltr

X.

BAHAN KACA
Kaca patri
Kaca bening 5 mm
Kaca ryban 5 mm
Kaca Es
Kaca Bening 12 mm

M2
M2
M2
M2
M2

1
2
3
4
4

HARGA SATUAN
(Rp)
159,500.00
84,700.00
64,000.00
78,000.00
107,800.00
59,200.00
46,100.00
4,400.00
42,900.00
35,000.00
20,000.00
21,600.00
50,000.00
50,700.00
16,500.00
23,400.00
29,300.00
31,000.00
8,900.00
5,200.00
16,000.00
23,000.00
14,200.00
12,000.00
23,000.00
8,500.00
9,000.00
60,000.00
24,100.00
22,600.00
19,100.00
42,000.00
45,600.00
34,200.00
18,500.00
58,400.00
21,700.00
29,000.00
58,400.00
21,700.00
29,000.00
23,500.00
28,800.00
51,100.00
300,000.00
96,000.00
91,400.00
80,000.00
306,300.00

NO

5
6
6
7
8
9
10
11
14
XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

URAIAN

SAT.

Kaca Buram 12 mm
Kaca Cermin tebal 5mm
Kaca nako
Kaca one way
Kaca tebal 3 mm
Kaca tebal 8 mm
Kaca, cermin tebal 8 mm
Kaca cermin, tebal 6 mm
Kaca Wireglass
Profil Kaca

M2
M2
M2
M2
M2
M2
M2
M2
M2
M'

BAHAN INSTALASI LISTRIK


HARDWARE JARINGAN 20 KV
Armour Rod # for 35 mm2
Armour Rod # for 50 mm2
Armour Rod # for 70 mm2
Armour Rod # for 150 mm2
Armour Rod # for 240 mm2
Armour Tape 1/4" wide
Aluminium connector
Armour rod # for AAAC 70 mm2
Amor rod tapping
Amor tape
Anchor rod 5/8 x 7"
Anchor rod 3/4 x 8"
Anchor rod 3/4 x 7"
Anchor Expanding 8.000 lbs
Anchor Expanding 10.000 lbs
Angle clamp primer
Bolt eye 5/8 x 10"
Bolt eye 5/8 x 12"
Bolt eye 5/8 x ridg length"
Bolt Machine 5/8" x ( 14" s/d 22" )
Bolt Machine 5/8 x 8"
Bolt Machine 5/8 x 9"
Bolt Machine 5/8 x 10"
Bolt Machine 5/8 x 12"
Bolt cariage 1/2" x 3/4"
Bolt Single Up Side 5/8" x 8"
Bolt Single Up Side 5/8" x 9"
Bolt Single Up Side 5/8" x 10"
Bolt Single Up Side 5/8" x 12"
Bolt Double Up Side 5/8" x (14" s/d 22" )
Bolt Double Up Side 5/8" x 10"
Bolt Double Up Side 5/8" x 12"
Bolt Double Up Side 5/8" x 9"
Bolt Double Up Side 5/8" x 8"
Bolt Double Arming 5/8" x (16" s/d 24" )
Bolt Double Arming 5/8" x 10"
Bolt Double Arming 5/8" x 12"
Bolt Double Arming 5/8" x 14"
Bimetalic Connector ( 35 s/d 240 ) mm2
Brace steel 550 mm
Brace steel 770 mm
Brace steel 1,262 mm
Bracket center

Set
Set
Set
Set
Set
Mtr
Bh
Set
Set
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
298,000.00
158,800.00
490,100.00
60,000.00
3,000.00
30,200.00
45,400.00
60,500.00
80,800.00
121,250.00
5,900.00
26,400.00
55,050.00
16,900.00
3,700.00
87,550.00
88,200.00
88,200.00
102,050.00
103,300.00
2,100.00
16,650.00
16,650.00
16,000.00
21,100.00
16,900.00
14,420.00
19,050.00
17,600.00
4,000.00
26,900.00
27,800.00
30,200.00
26,500.00
36,900.00
27,600.00
28,700.00
26,600.00
25,600.00
22,500.00
27,150.00
29,200.00
31,200.00
40,400.00
21,950.00
26,400.00
82,430.00
42,850.00

NO
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99

URAIAN
Bracket Secondary / Bracket Insulated
Brecket transformer
Bracket Extension For cut out
Bracket band segment vertical plat(Hot dip galvanis
Center Bracket 6 KN
Center Bracket 12,5 KN
Caterpain
Clamp bougel
Clamp ground rod
Clamp ground wire
Clamp hot line top assembly
Clamp Hot line ( 35 mm2 s/d 70 mm2)
Clamp Hot line ( 150 mm2 s/d 240 mm2)
Clamp Loop Dead End / LC ( 35 s/d 240 ) mm2
Clevis Swinging Secondary
Compression Connector H Type 150 mm2 / 240 mm2
Compression Connector H Type 240 mm2 / 240 mm2
Compression Connector H Type 50 mm2 / 70 mm2
Compression Connector H Type 70 mm2 / 150 mm2
Compression Connector H Type 70 mm2 / 70 mm2
Compression Terminal Lug 35 mm2
Compression Terminal Lug 50 mm2
Compression Terminal Lug 70 mm2
Compression Terminal Lug 150 mm2
Compression Terminal Lug 240 mm2
Cross Arm Steel 1.500 mm (UNSP 10) galvanis
Cross Arm Steel 2000 mm (UNSP 10) galvanis
Cross Arm Steel 3000 mm (UNSP 10) galvanis
Dead End Assembly ( CJ6-T)
Distribusi trafo CSP 50 KVA
Distribusi trafo CSP 25 KVA
Distribusi trafo CST 105 / CG 1 Phase 50 KVA
Distribusi trafo CST 106 / CG 3 Phase 50 KVA
Distribusi trafo CST 106 / CG 3 Phase 100 KVA
Distribusi trafo CST 106 / CG 3 Phase 160 KVA
Freeformed Guy Wire 22 mm2
Freeformed Guy Wire 35 mm2
Freeformed Guy Wire 70 mm2
Fuse Cut Out 20 KV, 100A
Fuse Link 3A
Fuse Link 6A
Fuse Link 8A
Fuse Link 10A
Fuse Link 15A
Fuse Link 20A
Fuse Link 25A
Fuse Link 30A
Fuse Link 50A
Fuse Link 60A
Fuse Link 65A
Fuse Link 80A
Fuse Link 100A
NT Fuse 63 - 100 A lengkap size 0
NT Fuse 63 - 100 A lengkap size 1
NT Fuse 63 - 100 A lengkap size 2
NT Fuse 63 - 100 A lengkap size 3

SAT.

HARGA SATUAN
(Rp)

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

18,540.00
334,750.00
60,500.00
368,760.00
67,300.00
79,900.00
3,200.00
13,150.00
13,900.00
13,900.00
149,350.00
64,600.00
110,200.00
25,770.00
19,050.00
40,000.00
43,280.00
24,720.00
37,000.00
28,600.00
36,050.00
10,600.00
13,300.00
25,400.00
31,800.00
269,600.00
359,500.00
539,400.00
73,140.00
33,359,700.00
31,953,100.00
27,912,500.00
36,540,000.00
44,152,500.00
68,005,000.00
27,600.00
32,800.00
38,200.00
1,133,000.00
36,900.00
36,900.00
36,900.00
36,900.00
36,900.00
47,100.00
47,100.00
47,100.00
60,500.00
60,500.00
60,500.00
60,500.00
50,400.00
74,000.00
94,300.00
114,400.00
148,200.00

NO

URAIAN

SAT.

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Guy Attachment / Guy hok


Guy wire SM 7 strad
Guy wire 22 mm2
Guy wire 35 mm2
Guy wire 70 mm2
Ground rod 5/8" x 8 " steel
Ground Wire CU 16 mm2
Ground Wire CU 25 mm2
Ground Wire CU 50 mm2
Grounding Iron Plate Form Plat / Eart safety mats
Ground rod and Washer
Ground rod 5/8" x 8 " Cooper weld
Insulating tape
Insulator suspension 10 KVA
Insulator starint road
Isolator Tumpu ( Line Post ) 20 KV
Isolator Tumpu ( Pin Post ) 20 KV
Isolator tarik ( Suspension ) 20 KV
Isolator tarik ( Suspension ) 20 KV Komplit dng Strain Clamp 35-150
Joint sleeve 35 mm2
Joint sleeve 50 mm2
Joint sleeve 70 mm2
Joint sleeve 150 mm2
Joint sleeve 240 mm2
Kousen
Large Angle Assembly ( CJ7-T)
Lock Nut 5/8"
LCC 240 mm2
Nut eye 5/8"
Nut Timble Eye 5/8"
Oval eye bolt 5/8" x 8"
Oval eye bolt 5/8" x 9"
Oval eye bolt 5/8" x (14 s/d 22")
Oval eye bolt 5/8" x 10"
Oval eye bolt 5/8" x 12"
Oval Eye Nut 5/8"
Paralel Group Clamp(150-70 mm2/35-16 mm2)
Pin Adapater insulator
Plastic Strap for Clamping
Pole band Double rack 3" atau 3 1/2"
Pole band Double rack 4" atau 4 1/2"
Pole band Double rack 5" atau 5 1/2"
Pole band Double rack 6" atau 6 1/2"
Pole band Double rack 7" atau 7 1/2"
Pole band Double rack 8" atau 8 1/2"
Pole band Double rack 9" s/d 12"
Pole band Double Side 3" atau 3 1/2"
Pole band Double Side 4" atau 4 1/2"
Pole band Double Side 5" atau 5 1/2"
Pole band Double Side 6" atau 6 1/2"
Pole band Double Side 7" atau 7 1/2"
Pole band Double Side 8" atau 8 1/2"
Pole band Double Side 9" s/d 12"
Pole band Single rack 3" atau 3 1/2"
Pole band Single rack 4" atau 4 1/2"
Pole band Single rack 5" atau 5 1/2"

Bh
m
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
12,800.00
7,000.00
8,450.00
12,400.00
22,500.00
73,500.00
23,200.00
36,900.00
67,300.00
1,138,400.00
11,300.00
119,800.00
23,300.00
215,000.00
28,100.00
215,600.00
215,600.00
245,200.00
377,400.00
26,950.00
31,900.00
33,700.00
96,900.00
118,600.00
4,000.00
106,200.00
9,900.00
191,900.00
9,800.00
15,000.00
20,950.00
11,100.00
22,800.00
16,750.00
18,000.00
19,096.00
23,300.00
31,000.00
2,060.00
26,200.00
27,470.00
28,900.00
30,200.00
45,700.00
51,550.00
36,900.00
30,200.00
32,200.00
34,300.00
36,300.00
50,600.00
56,200.00
44,400.00
24,200.00
25,500.00
26,900.00

NO
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

URAIAN
Pole band Single rack 6" atau 6 1/2"
Pole band Single rack 7" atau 7 1/2"
Pole band Single rack 8" atau 8 1/2"
Pole band Single rack 9" s/d 12"
Pole Band Single rack 10"
Pole band Single Up Side 3" atau 3 1/2"
Pole band Single Up Side 4" atau 4 1/2"
Pole band Single Up Side 5" atau 5 1/2"
Pole band Single Up Side 6" atau 6 1/2"
Pole band Single Up Side 7" atau 7 1/2"
Pole band Single Up Side 8" atau 8 1/2"
Pole band Single Up Side 9" s/d 12"
Primary Angle Clamp ( 35 s/d 70) mm2
Primary Angle Clamp ( 150 s/d 240 ) mm2
Primary Dead End Clamp ( 35 s/d 70) mm2
Primary Dead End ( 150 s/d 240 ) mm2
Shackle Anchor 5/8"
Side Bracket
Split bolt connector
Split plastic sleeve
Spol Insulator ANSI 53-2
Spol Insulator ANSI 53-4
Stainless Steel Strap 20 x 0,7 mm
Stainless Steel Strap
Strap for clamping
Steel L 70 x 70 x 7 x 1.000 mm galvanis
Steel L 70 x 70 x 7 x 1.262 mm galvanis
Steel L 70 x 70 x 7 x 780 mm galvanis
Stopping Buckle / Yokes
Suspension / Small Angle Assembly ( CJ5-T)
Tap Connector ( 35s/d 70) mm2
Tap Connector ( 35s/d 150) mm2
Tap Connector ( 70 s/d 150 ) mm2
Tap Connector ( 70 s/d 240 ) mm2
Three Bolt Clamp
Tie Wire # 4 / Alluminium Bonding Wire # 20
Washer Square 2 1/4"
Washer Square 2 1/2"
Washer Round 3/8"
Penghalang panjat
Papan tanda bah
5 Watt
Lampu TL
10 Watt
Lampu TL
15 Watt
Lampu TL
18 Watt
Lampu TL
20 Watt
Lampu TL
36 Watt
Lampu TL
40 Watt
ML
100 Watt
ML
160 Watt
ML
250 Watt
ML
250 Watt
SON
70 Watt
SON
150 Watt
SON
250 Watt
SON
400 Watt
BALAST / TRAFO

SAT.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Mtr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
28,200.00
29,500.00
30,900.00
35,000.00
45,500.00
28,200.00
30,200.00
32,200.00
34,300.00
47,300.00
52,400.00
42,300.00
56,650.00
60,500.00
67,300.00
94,300.00
18,000.00
69,300.00
23,100.00
2,100.00
36,050.00
41,200.00
10,900.00
2,800.00
2,650.00
20,600.00
215,200.00
107,200.00
2,100.00
33,100.00
5,200.00
13,600.00
18,300.00
23,200.00
38,100.00
6,600.00
3,200.00
3,200.00
1,500.00
88,100.00
17,600.00
12,100.00
16,100.00
18,700.00
22,800.00
24,100.00
26,900.00
6,600.00
202,100.00
188,600.00
336,500.00
417,700.00
269,500.00
363,800.00
43,300.00
296,500.00

NO
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

HPL
HPL
HPL
HPL
HPL
HPL
Contactor
Contactor
Contactor
Ignitor SN 58
Kapasitor
MCB

URAIAN

SAT.

HARGA SATUAN
(Rp)

50
70
80
125
250
400
25
35
16

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Pak
Bh
Bh
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
Bh
Bh
Bh
Bh
Bh
Bh
Bh

269,500.00
269,500.00
283,000.00
296,500.00
350,400.00
148,200.00
229,000.00
229,000.00
6,600.00
134,700.00
113,500.00
67,300.00
80,800.00
309,900.00
1,078,200.00
1,347,800.00
1,887,000.00
2,021,800.00
2,695,700.00
4,043,600.00
5,661,000.00
8,761,100.00
9,435,100.00
12,804,700.00
20,150.00
107,800.00
1,900.00
67,300.00
47,100.00
40,400.00
20,150.00
18,700.00
4,000.00
16,100.00
13,400.00
13,400.00
8,600.00
4,550.00
9,300.00
20,100.00
9,300.00
14,700.00
16,100.00
21,500.00
26,900.00
53,800.00
14,700.00
53,800.00
2,650.00
10,700.00
20,150.00
202,000.00
242,500.00
3,369,600.00
5,391,400.00

watt
watt
watt
watt
watt
watt
Ampere
Ampere
Ampere

6-16 Ampere
17-35 Ampere
Lebih dari 63 Ampere
Megnetic Switch
10 Ampere
20 Ampere
29 Ampere
35 Ampere
50 Ampere
65 Ampere
95 Ampere
125 Ampere
150 Ampere
220 Ampere
Stop kontak
outbow
outbow
In bow
In bow
In bow
In bow
Saklar Engkel
outbow
In bow
Staker
Biasa / tanopa arde
dengan arde
Klem U
Klem Kabel
Fitting
Plafon
Gantung
NYM Uk.
2x2,5 mm
NYM Uk.
2 x 4 mm
NYM Uk.
4 x 4 mm
NYY Uk.
3x2,5 mm
NYY Uk.
2x4 mm
NYY Uk.
3x4 mm
NYY Uk.
4x4 mm
NYY Uk.
4x6 mm
DX / Twisted
LVTC 2x70 +N.50
LVTC 2x35 +N.50
Isolasi keci
Isolasi besar
Test pen
Fotosel ( otomat )
Modul Lampu amar
Modul Traffic Light
Tangga Aluminium Lipat P 8 meter

NO
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

URAIAN
Klem Pole Band
Pal Bantu RS 9
Konsol panjang 6 meter 2 " tebal 3 mm Medium A
Konsol panjang 6 meter 2 " tebal 2 mm Medium A
Pool Massa
Kap lampu Son 250 Watt Lengkap
Kap lampu Son 250 Watt Type SMR 511
Kap lampu TL isi 2
Kap Lampu Caping LHE
Sekering
Fiting SON
T Doos
Stop kontak AC
Contak cleaner
Jek AC
Pal bantu berornamen
Tambang plastik besar
Sayang bambu komplit
Martil / palu 5 Kg
Bor listrik
Mata bor
Digger Tanah
Pemasangan Jaringan Listrik
KWH Meter 1 phasa 220 v, 5 / 20 A, s1 F,5/20A,ST
KWH Meter 1 Phasa 220 v, 20/60A, s 1 F,20/60A,ST
KWH Meter 1 Phasa 220 v, 50/100 A, 1 F,50/100A,ST
KWH Meter 3 Phasa 220/380 v,5/20 A3 F,5/20A,ST
KWH Meter 3 Phasa 220/380 v,20/60 3 F,20/60A,ST
KWH Meter 3 Phasa 220/380 v,50/1003 F,50/100A,ST
KWH Meter 3 Phasa 220/380 v,5/20 A3 F,5/20A,DT
KWH Meter 3 Phasa 220/380 v,20/60 3 F,20//60A,DT
KWH Meter 3 Phasa 220/380 v,50/10 3 F,50/100A,DT
KVARH Meter 3 Ph 220/380 v,5/20 A, 3 F,5/20A,DT
KVARH Meter 3 Ph 220/380 v,20/60 A3 F,20/60A,ST
KVARH Meter 3 Ph 220/380 v,50/100 3 F,50/100A,ST
KWH Meter 3 Phasa 57, 7/100 v, /5A, 3 F,/5 A,ST
KWH Meter 3 Phasa 57, 7/100 v, /5A, 3 F, /5 A,DT
KOTAK APP
Kotak APP Type Lipat, lengkap
Type I Lipat
Kotak APP Type III Lipat, lengkap
Type III
Kotak APP TR Type IV Tanpa Topi, le Type IV
Kotak APP TR Type I A Single tarif le Type I
Kotak APP TR Double Tarif, lengkap Double tarif
Kotak APP TM, lengkap
TM
TRANSFORMATOR
Trafo 1 Phasa CSP 12,7 KV/B2
50 KVA
Trafo 3 Phasa 20 KV/B2
50 KVA
Trafo 3 Phasa 20 KV/B2
100 KVA
Trafo 3 Phasa 20 KV/B2
160 KVA
Trafo 3 Phasa 20 KV/B2
200 KVA
Trafo 3 Phasa 20 KV/B2
250 KVA
Trafo 3 Phasa 20 KV/B2
315 KVA
Trafo 3 Phasa 20 KV/B3
400 KVA
Trafo 3 Phasa 20 KV/B2
630 KVA
KONDUKTOR

SAT.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m'
Set
Bh
Bh
Set
Bh

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
175,150.00
2,021,800.00
673,900.00
606,500.00
121,250.00
3,774,000.00
1,010,900.00
606,500.00
1,077,000.00
33,600.00
53,800.00
6,600.00
80,800.00
33,600.00
26,900.00
5,484,100.00
3,800.00
127,900.00
33,600.00
1,213,000.00
269,500.00
202,100.00
204,200.00
166,300.00
297,700.00
1,199,550.00
1,266,700.00
1,347,300.00
1,546,800.00
1,616,800.00
1,751,500.00
1,198,800.00
1,266,700.00
1,347,300.00
1,226,400.00
1,549,900.00
50,300.00
235,800.00
4,717,550.00
5,822,700.00
6,038,400.00
5,607,000.00
39,232,100.00
45,765,200.00
60,690,000.00
83,391,100.00
89,733,300.00
105,051,800.00
100,458,800.00
119,568,700.00
171,793,800.00
-

NO
###
###
###
###
###
###
###
###
###
###
###

URAIAN

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

AAAC 25 mm2
25 mm2
AAAC 35 mm2
35 mm2
AAAC 50 mm2
50 mm2
AAAC 70 mm2
70 mm2
AAAC 150 mm2
150 mm2
AAAC 240 mm2
240 mm2
AAAC/S 150 mm2
150 mm2
AAAC/S 240 mm2
240 mm2
ACSR 70 mm2
70 mm2
ACSR 150 mm2
150 mm2
ACSR 240 mm2
240 mm2
KABEL TM/TR
NFA2X-T 2 x 35 + N 50 mm2
2x35+N50mm2
NFA2X-T 2 x 70 + N 50 mm2
2x70+N50mm2
NFA2X-T 3 x 70 + N 50 mm2
3x70+N50mm2
NFA2X 2 x 10 mm2
2x10 mm2
NFA2X 2 x 16 mm2
2x16 mm2
NFA2X 2 x 25 mm2
2x25 mm2
NFA2X 4 x 10 mm2
4x10 mm2
NFA2X 4 x 16 mm2
4x16 mm2
NFA2X 4 x 25 mm2
4x25 mm2
Kabel NYFGBY 4 x 4 mm2
4x4 mm2
Kabel NYFGBY 4 x 50 mm2 CU
4x50 mm2
Kabel NYFGBY 4 x 95 mm2 CU
4x95 mm2
Kabel NYFGBY 4 x 150 mm2 CU
4x150 mm2
Kabel NYY 1X 150 mm2
1x150 mm2
Kabel NA2XSEFGbY 20 KV, 3 X 150 3x150 mm2
Kabel NA2XSY 20 KV, 1 X 240 mm2 1x240 mm2
Kabel NA2XSEYBY 20 KV, 3 X 240 m 3x240 mm2
Kabel NA2XSY 20 KV, 1 X 150 mm2 1x120 mm2
Kabel NA2XSEYBY 20 KV, 3 X 300 m 3x300 mm2
Kabel NA2XSY 20 KV, 1 X 70 mm2 1x95 mm2
Kabel NA2XSEYBY 20 KV, 3 X 95 mm 3x95 mm2
Kabel NA2XS2Y 20 KV, 1 X 150 mm2 1x150 mm2
Kabel NA2XS2Y 20 KV, 1 X 240 mm2 1x240 mm2
Kabel NA2XS2Y 20 KV, 1 X 300 mm2 1x300 mm2
Kabel NFA2XSY-T-3 X 240+50 mm2,2 3x240 mm2
Kabel NYA Fleksibel 2,5 mm2
2,5 mm2
Kabel NYA Fleksibel 4 mm2
4 mm2
Kabel NYA Fleksibel 6 mm2
6 mm2
Kabel NYA Fleksibel 10 mm2
10 mm2
Kabel NYA Fleksibel 16 mm2
16 mm2
Kabel LVTC Ukuran 3 x 35 + N.25
Kabel LVTC Ukuran 3 x 70 + N.25

###
###
###
###
###
###
###
###
###
###

SEPATU KABEL
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU
Sepatu Kabel AL/CU

Ring
Ring
Ring
Ring
Ring
Ring
Ring
Kepala
Kepala
Kepala

SAT.
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr

50
70
95
120
150
185
240
50
70
95

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
22,000.00
27,500.00
38,500.00
49,500.00
82,500.00
93,500.00
88,000.00
110,000.00
14,850.00
31,700.00
51,900.00
23,100.00
35,600.00
45,900.00
4,300.00
6,900.00
9,100.00
9,500.00
13,600.00
18,450.00
37,000.00
271,600.00
514,950.00
798,500.00
167,100.00
367,000.00
122,100.00
421,700.00
100,700.00
487,400.00
71,610.00
259,390.00
100,700.00
122,000.00
135,500.00
334,800.00
2,400.00
5,400.00
7,950.00
12,730.00
13,050.00
27,400.00
39,100.00
64,600.00
68,200.00
71,700.00
81,900.00
87,700.00
111,200.00
128,300.00
48,400.00
52,500.00
55,050.00

NO
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

URAIAN
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/CU Kepala
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel AL/AL
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
Sepatu Kabel CU/CU
TIANG BETON
C 7M-100 daN+E
7M-100 daN+E
C 9M-100 daN+E
9M-100 daN+E
C 9M-200 daN+E
9M-200 daN+E
C 11M-200 daN+E
11M-200 daN+E
C 11M-350 daN+E
11M-350 daN+E
C 12M-200 daN+E
12M-200 daN+E
C 12M-350 daN+E
12M-350 daN+E
C 12M-500 daN+E
12M-500 daN+E
C 13M-350 daN+E
13M-350 daN+E
C 13M-500 daN+E
13M-500 daN+E
C 14M-350 daN+E
14M-350 daN+E
C 14M-500 daN+E
14M-500 daN+E
ABSW
Load Break switch 20 KV-630A
20 KV, 630 A
Load Break switch 20 KV-630A (Moto 20 KV, 630 A
6 lengkap dengan kontrol
D.S
Disconnecting Switch 20 KV-630 A 20 KV, 630 A
ARESTER
Lightning Arester 20 KV, 5 KA
20 KV, 5 KA.
Lightning Arester 20 KV, 10 KA
20 KV, 10 KA
CAPACITOR POLE MOUNTED
Micro Cap Controller
Current Sensor
ACCESSORIES APP
Kawat Segel
Timah segel
Service wedge Clamp 616
Service wedge Clamp 625
PEKERJAAN KABEL TANAH
Terminating kabel 3 x 300 mm2 ID 3 x 300 mm2
Terminating kabel 1 x 300 mm2 ID 1 x 300 mm2
Terminating kabel 3 x 300 mm2 OD 3 x 300 mm2
Terminating kabel 1 x 300 mm2 OD 1 x 300 mm2
Terminating kabel 3 X 240 mm2 ID 3 x 240 mm2
Terminating kabel 1 x 240 mm2 ID 1 x 240 mm2
Terminating kabel 3 x 240 mm2 OD 3 x 240 mm2
Terminating kabel 1 x 240 mm2 OD 1 x 240 mm2

SAT.
120
150
185
240
35
50
70
95
120
150
240
35
50
70
95
150
240

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Set
Set

Set
Bh
Bh
Bh
Bh
Roll
Kg
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set

HARGA SATUAN
(Rp)
57,900.00
66,400.00
81,150.00
85,000.00
9,200.00
9,800.00
9,800.00
11,550.00
14,500.00
19,800.00
26,200.00
21,100.00
23,800.00
30,650.00
38,000.00
61,200.00
107,150.00
1,703,600.00
2,226,840.00
2,585,000.00
3,740,000.00
4,345,000.00
4,294,290.00
4,688,100.00
5,450,400.00
5,712,630.00
6,093,780.00
6,455,200.00
7,133,280.00
23,586,900.00
172,527,800.00
10,108,250.00
724,300.00
826,200.00
24,814,450.00
17,717,900.00
80,800.00
60,400.00
3,600.00
4,900.00
4,177,800.00
2,559,950.00
4,986,230.00
2,897,300.00
3,778,925.00
3,371,540.00
5,379,800.00
3,805,400.00

NO
###
###
###
###
###
###
###
###
###
###
###

URAIAN
Terminating kabel 3 x 95 mm2 ID
Terminating kabel 1 x 95 mm2 ID
Terminating kabel 3 x 95 mm2 OD
Terminating kabel 1 x 95 mm2 OD
Jointing Raychem 24 kV 3 x 300 mm
Jointing Raychem 24 kV x 300 mm2
Jointing Raychem 24 kV 3 x 240 mm
Jointing Raychem 24 kV 1 x 240 mm
Jointing Raychem 24 kV 3 x 95 mm2
Jointing Raychem 24 kV 1 x 95 mm2
Klem beugel bevesteging 8 x 6"

3
1
3
1
3
3
3
3
3
3
8

x
x
x
x
x
x
x
x
x
x
x

SAT.
95 mm2
95 mm2
95 mm2
95 mm2
300 mm2
1 x 300 mm2
240 mm2
1 x 240 mm2
95 mm2
1 x 95 mm2
6"

Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh

XII.
1
2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

ALAT - ALAT PENGUNCI & PENGGANTUNG


Door Closer
Door Holder
Door stop
Door holder / Pegangan pintu
Door stop
Engsel angin
Engsel Jendela
Engsel Jendela Kuning
Engsel Pintu Kuning
Engsel Pintu Biasa
Engsel Pintu
Grendel jendela kuning
Grendel jendela biasa
Grendel pintu kuning
Grendel pintu biasa
Hak angin kuning
Hak angin biasa
Kait Angin
Kunci bulat
Kunci tanam 2 slag
Kunci tanam besar / antik
Kunci lemari
Kunci selot
Kunci silinder

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Psg
Psg
Psg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

XIII.
1
2
3
3
4
5
6
6
7
8
9
10
11
12
13
14
15

BAHAN
SANITAIR
Bak cuci stainless steel Royal
Bak cuci stainless steel Viega ( 1.00 x 0.90 ) m2
Bak cuci stainless steel 80 cm
Bak fiberglass vol 30 ltr
Bak mandi fiber glass, vol 120 ltr sudut
Bak mandi fiber glass, vol 120 ltr kotak
Bak mandi fiber glass, vol 150 ltr
Bak mandi fiber glass, vol 1000 ltr
Bak Tandon air fiber isi 500 Ltr
Bak Tandon air fiber isi 1000 Ltr
Floor Drain / Saringan pembuang pada lantai KM/WC
Kloset duduk / Monoblok "INA", Putih
Kloset duduk / Monoblok "INA", Warna Tua
Kloset duduk / Monoblok + pembilas otomatis "INA"
Kloset duduk Colour
Kloset Jongkok INA warna tua
Kloset Jongkok INA warna muda

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HARGA SATUAN
(Rp)
2,844,200.00
240,175.00
4,177,800.00
3,182,700.00
4,295,200.00
4,447,200.00
473,950.00
4,380,450.00
4,380,450.00
3,705,700.00
30,230.00
195,000.00
116,900.00
80,300.00
16,900.00
7,000.00
9,500.00
15,000.00
18,500.00
10,900.00
19,400.00
7,100.00
5,300.00
9,250.00
7,400.00
11,750.00
6,500.00
5,500.00
53,000.00
79,000.00
33,900.00
25,800.00
72,600.00
55,600.00
180,600.00
154,300.00
128,600.00
228,900.00
234,000.00
260,000.00
856,900.00
1,201,900.00
16,600.00
373,700.00
300,000.00
1,183,750.00
254,000.00
142,200.00
137,200.00

NO
16
17
18
19
20
21
21
22
23
24
25
26

URAIAN

SAT.

Stop Kran 1/2"


Stop Kran 3/4"
Stop Kran Double
Shower Tray
Tempat Sabun keramik
Urinoir
Water Drain Asesoris
Wastafel ( INA )
Shower Tray
Tempat Sabun keramik
Wastafel ( INA )
Wastafel Colour

Bh
Bh
bh
Bh
Bh
Bh
Set
Bh
Bh
Bh
Bh
Bh

XIV.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

ALAT PENGIKAT KAYU


Baut Salang kuda2
Baut lawa - lawa
Paku (Reng, Usuk, Plafond)
Paku 12 cm
Paku 12 cm
Paku Asbes
Paku sekrup
Paku sekrup
Paku skrup fixer
Paku Sekrup Asbes
Paku Payung
Paku Keling
Paku Eternit
Paku Pancing

Kg
Bh
Kg
Bh
Kg
Kg
Bh
Kg
Bh
Bh
Kg
Kg
Kg
Kg

XV.
1
2
3
4
5
5
6
7
8
9
10
11
12
12
13
14
15
16
17
18
19
20
20
21
22
23

LAIN - LAIN
Anti Rayap
Air
Aspal curah
Aspal Drum
Alat Bantu
Daun Naco
Elastomer strip uk. 30 x 30
Elastomer strip uk. 20 x 20
Gebalan rumput
Geotextile
Ijuk
Karpet
Karet dan epoxy mortar
Karpet
Minyak Bekisting
Minyak flux
Minyak pelumas
Minyak Tanah
Minyak Bakar
Minyak solar
Minyak solar industri
Minyak bensin
Minyak bensin industri
Sealent
Soda api
Sabun

Ltr
Ltr
Kg
Kg
Set
Bh
Bh
Bh
M2
M2
Kg
M2
Kg
M2
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
Tube
Kg
Kg

HARGA SATUAN
(Rp)
18,600.00
18,900.00
65,000.00
87,400.00
29,800.00
350,000.00
225,000.00
62,300.00
27,000.00
217,500.00
220,000.00
20,000.00
15,000.00
18,800.00
300.00
21,000.00
24,900.00
1,000.00
19,000.00
1,550.00
1,200.00
22,600.00
20,150.00
20,000.00
41,200.00
26,150.00
100.00
7,631.33
9,155.27
50,000.00
1,180,000.00
850,000.00
30,000.00
23,000.00
40,000.00
15,200.00
26,900.00
20,000.00
20,000.00
17,000.00
30,000.00
9,650.00
6,500.00
6,000.00
9,200.00
6,700.00
13,500.00
16,000.00
9,500.00

NO

URAIAN

CATATAN :
- Harga belum termasuk keuntungan
pemborong dan PPN10%

SAT.

HARGA SATUAN
(Rp)

Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya

SUKAHAR, ST, MT
NIP 19601103 198103 1 006

DAFTAR HARGA SATUAN UPAH TENAGA


KEGIATAN
PEKERJAAN
LOKASI
TA

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

URAIAN
Pekerja
Tukang gali
Mandor
Tukang cat/ plitur / batu
Kepala tukang cat/ plitur / batu
Tukang kayu
Kepala tukang kayu
Tukang Besi / ledeng
Kepala Tukang besi / ledeng
Tukang Besi Profil
Kepala Tukang besi Profil
Mekanik
Mekanik Pembantu
Operator terlatih/ masinis
Operator kurang terlatih
Pembantu operator/ pemb. masinis
Sopir truk
Sopir personil
Pembantu sopir
Buruh lapangan tak terlatih
Buruh lapangan semi terlatih
Buruh lapangan terlatih
Tukang masak aspal
Penjaga malam

SATUAN
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

HARGA ( Rp )
50,000.00
70,000.00
75,000.00
70,000.00
75,000.00
70,000.00
75,000.00
70,000.00
75,000.00
70,000.00
75,000.00
65,000.00
55,000.00
65,000.00
60,000.00
45,000.00
60,000.00
50,000.00
50,000.00
45,000.00
50,000.00
60,000.00
65,000.00
40,000.00

Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya

SUKAHAR, ST, MT
NIP 19601103 198103 1 006

ANALISIS HARGA SATUAN PEKERJAAN BERDASARKAN PED. AHSP BID. PU


PERMEN PU NO 11/PRT/M/2013
:
:
:
:

KEGIATAN
PEKERJAAN
LOKASI
TA

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

PEKERJAAN PERSIAPAN
A.2.2.1.2. Pembuatan 1 m2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kayu Dolken diameter 8 - 10 /
400
cmPortland
Semen
Seng Gelombang
Pasir Beton
Koral Beton
Kayu 5/7
Paku Biasa 2" - 5"
Meni Besi

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.200
50,000.00
0.400
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

10,000.00
28,000.00
1,500.00
1,500.00
41,000.00

Btg
Kg
Lbr
m3
m3
m3
Kg
Kg

1.250
19,900.00
2.500
1,500.00
1.200
47,500.00
0.005
174,500.00
0.009
170,588.47
0.072
1,145,500.00
0.060
18,800.00
0.450
24,100.00
JUMLAH HARGA BAHAN

24,875.00
3,750.00
57,000.00
872.50
1,535.30
82,476.00
1,128.00
10,845.00
182,481.80

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

223,481.80
33,522.27
257,004.07

15% x D

A.2.2.1.2aPembuatan 1 m1 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Dolken diameter 8 - 10 /
400
cmPortland
Semen
Seng Gelombang
Pasir Beton
Koral Beton
Kayu Lokal 5/7
Paku Biasa 2" - 5"

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.200
50,000.00
0.400
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

10,000.00
28,000.00
1,500.00
1,500.00
41,000.00

Btg
Kg
Lbr
m3
m3
m3
Kg

1.250
19,900.00
2.500
1,500.00
1.200
47,500.00
0.005
174,500.00
0.009
170,588.47
0.014
1,145,500.00
0.060
18,800.00
JUMLAH HARGA BAHAN

24,875.00
3,750.00
57,000.00
872.50
1,535.30
16,317.65
1,128.00
105,478.44

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

146,478.44
21,971.77
168,450.21

15% x D

A.2.2.1.10Pembuatan 1 m2 steger/perancah dari bambu

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Bambu diameter 6 - 8 / 600 cm
Tali Ijuk

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.170
50,000.00
0.250
70,000.00
0.002
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

8,500.00
17,500.00
150.00
97.50
26,247.50

Btg
Kg

1.250
14,250.00
0.186
40,000.00
JUMLAH HARGA BAHAN

17,812.50
7,440.00
25,252.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

51,500.00
7,725.00
59,225.00

15% x D

A.2.2.1.13Pembongkaran 1 m3 beton bertulang

No
A

Uraian
TENAGA
Pekerja
Mandor

BAHAN

D
E
F

Kode

L.01
L.04

Satua Koefisie
n
n
OH
OH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Harga
Satuan
(Rp)

6.667
50,000.00
0.333
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
333,350.00
24,975.00
358,325.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

358,325.00
53,748.75
412,073.75

15% x D

A.2.2.1.14Pembongkaran 1 m3 dinding tembok bata

No
A

Uraian
TENAGA
Pekerja

Kode

L.01

Satua Koefisie
n
n
OH

6.667

Harga
Satuan
(Rp)
50,000.00

Jumlah
Harga
(Rp)
333,350.00

Mandor
B

BAHAN

D
E
F

L.04

OH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

0.033
75,000.00
JUMLAH TENAGA KERJA

2,475.00
335,825.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

335,825.00
50,373.75
386,198.75

15% x D

A.2.2.1.16Pemasangan 1 m2 panel beton pracetak 5 x 50 x 213 cm

No
A

Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Panel Beton Pracetak
Kolom Beton Pracetak
Semen PC
Pasir Beton
Koral Beton

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.375
50,000.00
0.125
70,000.00
0.012
75,000.00
0.019
75,000.00
JUMLAH TENAGA KERJA

18,750.00
8,750.00
900.00
1,425.00
29,825.00

Lbr
Btg
Kg
m3
m3

0.986 #
#VALUE!
0.525 #
#VALUE!
45.000
1,500.00
67,500.00
0.074
174,500.00
12,913.00
0.146
170,588.47
24,905.92
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No
A

Uraian
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

Kode

L.01
L.04

Satua Koefisie
n
n
OH
OH

Harga
Satuan
(Rp)

0.750
50,000.00
0.025
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
37,500.00
1,875.00
39,375.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

39,375.00
5,906.25
45,281.25

15% x D

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m

No
A

Uraian
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Kode

L.01
L.04

Satua Koefisie
n
n
OH
OH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Harga
Satuan
(Rp)

0.900
50,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
45,000.00
3,375.00
48,375.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

48,375.00
7,256.25
55,631.25

15% x D

A.2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m

No
A

Uraian
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Kode

L.01
L.04

Satua Koefisie
n
n
OH
OH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Harga
Satuan
(Rp)

1.050
50,000.00
0.067
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
52,500.00
5,025.00
57,525.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

57,525.00
8,628.75
66,153.75

15% x D

A.2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m

No
A

Uraian
TENAGA
Pekerja
Mandor

Satua Koefisie
Kode
n
n
L.01
L.04

OH
OH

Harga
Satuan
(Rp)

1.000
50,000.00
0.032
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
50,000.00
2,400.00
52,400.00

BAHAN

JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

52,400.00
7,860.00
60,260.00

15% x D

A.2.3.1.6. Penggalian 1 m3 tanah lumpur sedalam 1 m

No
A

D
E
F

Uraian
TENAGA
Pekerja
Mandor

Satua Koefisie
Kode
n
n
L.01
L.04

OH
OH

Harga
Satuan
(Rp)

1.200
50,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
60,000.00
3,375.00
63,375.00

BAHAN

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

63,375.00
9,506.25
72,881.25

15% x D

A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter

No
A

D
E
F

Uraian
TENAGA
Pekerja
Mandor

Satua Koefisie
Kode
n
n
L.01
L.04

OH
OH

Harga
Satuan
(Rp)

0.330
50,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
16,500.00
750.00
17,250.00

BAHAN

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

17,250.00
2,587.50
19,837.50

15% x D

A.2.3.1.8aPembuangan 1 m3 tanah sejauh 100 meter


(Pendekatan Analisa menggunakan BOW.A.7)

No
A

Uraian
TENAGA
Dipakai rumus K = a/275 x
(L+75)
K = (Pekerja / 275) x (Jarak +
75)

Satua Koefisie
Kode
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

31,818.18

JUMLAH TENAGA KERJA


B

D
E
F

31,818.18

BAHAN

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

31,818.18
4,772.73
36,590.91

15% x D

A.2.3.1.8bPembuangan 1 m3 tanah sejauh 200 meter


(Pendekatan Analisa menggunakan BOW.A.7)

No
A

Uraian

Satua Koefisie
n
n

TENAGA
Dipakai rumus K = a/275 x
(L+75)
K = (Pekerja / 275) x (Jarak +
75)

BAHAN

PERALATAN

D
E
F

Kode

Harga
Satuan
(Rp)

JUMLAH TENAGA KERJA

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Jumlah
Harga
(Rp)

50,000.00
50,000.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

50,000.00
7,500.00
57,500.00

15% x D

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


(Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali koefisien pekerjaan galian)

No
A

Uraian
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Kode

L.01
L.04

Satua Koefisie
n
n
OH
OH

Harga
Satuan
(Rp)

0.250
50,000.00
0.025
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
12,500.00
1,875.00
14,375.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x D

A.2.3.1.10Pemadatan tanah 1 m3 tanah ( per 20 cm)

14,375.00
2,156.25
16,531.25

No
A

Uraian
TENAGA
Pekerja
Mandor

BAHAN

PERALATAN

D
E
F

Kode

Satua Koefisie
n
n

L.01
L.04

OH
OH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Harga
Satuan
(Rp)

0.500
50,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
25,000.00
3,750.00
28,750.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

28,750.00
4,312.50
33,062.50

15% x D

A.2.3.1.11Pengurugan 1 m3 dengan pasir urug

No
A

Uraian
TENAGA
Pekerja
Mandor

Satua Koefisie
Kode
n
n
L.01
L.04

BAHAN
Pasir Urug

OH
OH

m3

Harga
Satuan
(Rp)

0.300
50,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA
1.200

132,400.00

JUMLAH HARGA BAHAN


C

Jumlah
Harga
(Rp)
15,000.00
750.00
15,750.00
158,880.00
158,880.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

174,630.00
26,194.50
200,824.50

15% x D

A.2.3.1.13Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan

No
A

Uraian
TENAGA
Pekerja
Mandor
BAHAN
Ijuk

Satua Koefisie
Kode
n
n
L.01
L.04

OH
OH

kg

Harga
Satuan
(Rp)

0.150
50,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA
6.000

40,000.00

JUMLAH HARGA BAHAN


C

7,500.00
1,125.00
8,625.00
240,000.00
240,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%

15% x D

248,625.00
37,293.75

Harga Satuan Pekerjaan (D+E)

285,918.75

A.2.3.1.14Pengurugan 1 m3 sirtu padat

No
A

Uraian
TENAGA
Pekerja
Mandor

Kode

L.01
L.04

BAHAN
Sirtu

Satua Koefisie
n
n
OH
OH

m3

Harga
Satuan
(Rp)

0.250
50,000.00
0.025
75,000.00
JUMLAH TENAGA KERJA
1.200

122,900.00

JUMLAH HARGA BAHAN


C

Jumlah
Harga
(Rp)
12,500.00
1,875.00
14,375.00
147,480.00
147,480.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

161,855.00
24,278.25
186,133.25

15% x D

PEKERJAAN PONDASI
A.3.2.1.2. Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Batu Belah
Semen Portland
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

75,000.00
52,500.00
5,625.00
5,625.00
138,750.00

m3
Kg
m3

1.200
195,400.00
163.000
1,500.00
0.520
158,300.00
JUMLAH HARGA BAHAN

234,480.00
244,500.00
82,316.00
561,296.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

700,046.00
105,006.90
805,052.90

15% x D

A.3.2.1.2aPemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP (Batu belah 60%,Blonos 40%)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

1.500
0.750
0.075
0.075

Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
75,000.00

Jumlah
Harga
(Rp)
75,000.00
52,500.00
5,625.00
5,625.00

BAHAN
Batu Belah
Batu kali/blonos
Semen Portland
Pasir Pasang

m3
m3
Kg
m3

JUMLAH TENAGA KERJA

138,750.00

0.720
195,400.00
0.480
176,200.00
163.000
1,500.00
0.520
158,300.00
JUMLAH HARGA BAHAN

140,688.00
84,576.00
244,500.00
82,316.00
552,080.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

690,830.00
103,624.50
794,454.50

15% x D

A.3.2.1.3. Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 5PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Batu Belah
Semen Portland
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

75,000.00
52,500.00
5,625.00
5,625.00
138,750.00

m3
Kg
m3

1.200
195,400.00
136.000
1,500.00
0.544
158,300.00
JUMLAH HARGA BAHAN

234,480.00
204,000.00
86,115.20
524,595.20

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

663,345.20
99,501.78
762,846.98

15% x D

A.3.2.1.3aPemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 5PP (Batu belah 60%,Blonos 40%)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Batu kali/blonos
Semen Portland
Pasir Pasang

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

75,000.00
52,500.00
5,625.00
5,625.00
138,750.00

m3
m3
Kg
m3

0.720
195,400.00
0.480
176,200.00
136.000
1,500.00
0.544
158,300.00
JUMLAH HARGA BAHAN

140,688.00
84,576.00
204,000.00
86,115.20
515,379.20

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

654,129.20
98,119.38
752,248.58

15% x D

A.3.2.1.4. Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 6PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Batu Belah
Semen Portland
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

75,000.00
52,500.00
5,625.00
5,625.00
138,750.00

m3
Kg
m3

1.200
195,400.00
117.000
1,500.00
0.561
158,300.00
JUMLAH HARGA BAHAN

234,480.00
175,500.00
88,806.30
498,786.30

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

637,536.30
95,630.45
733,166.75

15% x D

A.3.2.1.4aPemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 6PP (Batu belah 60%,Blonos 40%)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Batu Belah
Batu kali/blonos
Semen Portland
Pasir Pasang

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

75,000.00
52,500.00
5,625.00
5,625.00
138,750.00

m3
m3
Kg
m3

0.720
195,400.00
0.480
176,200.00
117.000
1,500.00
0.561
158,300.00
JUMLAH HARGA BAHAN

140,688.00
84,576.00
175,500.00
88,806.30
489,570.30

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

628,320.30
94,248.05
722,568.35

15% x D

A.3.2.1.5. Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 8PP

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Batu Belah
Semen Portland
Pasir Pasang

OH
OH
OH
OH

1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

75,000.00
52,500.00
5,625.00
5,625.00
138,750.00

m3
Kg
m3

1.200
195,400.00
91.000
1,500.00
0.584
158,300.00
JUMLAH HARGA BAHAN

234,480.00
136,500.00
92,447.20
463,427.20

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

602,177.20
90,326.58
692,503.78

15% x D

A.3.2.1.5aPemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 8PP (Batu belah 60%,Blonos 40%)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Batu Belah
Batu kali/blonos
Semen Portland
Pasir Pasang

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.500
50,000.00
0.750
70,000.00
0.075
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

75,000.00
52,500.00
5,625.00
5,625.00
138,750.00

m3
m3
Kg
m3

0.720
195,400.00
0.480
176,200.00
91.000
1,500.00
0.584
158,300.00
JUMLAH HARGA BAHAN

140,688.00
84,576.00
136,500.00
92,447.20
454,211.20

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

592,961.20
88,944.18
681,905.38

15% x D

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Kali/Blonos
Pasir urug

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.780
50,000.00
0.390
70,000.00
0.039
75,000.00
0.039
75,000.00
JUMLAH TENAGA KERJA

39,000.00
27,300.00
2,925.00
2,925.00
72,150.00

m3
m3

1.200
176,200.00
0.432
132,400.00
JUMLAH HARGA BAHAN

211,440.00
57,196.80
268,636.80

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

340,786.80
51,118.02
391,904.82

15% x D

A.3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu bela

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Batu Belah
Semen Portland
Pasir Beton
Kerikil (batu pecah mesin)
Besi Beton
Kawat Beton

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

3.400
50,000.00
0.850
70,000.00
0.085
75,000.00
0.170
75,000.00
JUMLAH TENAGA KERJA

170,000.00
59,500.00
6,375.00
12,750.00
248,625.00

m3
kg
m3
m3
kg
kg

0.480
195,400.00
194.000
1,500.00
0.312
174,500.00
0.468
170,588.47
126.000
9,100.00
1.800
15,800.00
JUMLAH HARGA BAHAN

93,792.00
291,000.00
54,444.00
79,835.40
1,146,600.00
28,440.00
1,694,111.40

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1,942,736.40
291,410.46
2,234,146.86

15% x D

A.3.2.1.11 Pemasangan 1 m3 pondasi sumuran, diameter 100 cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Belah
Semen Portland
Pasir Beton
Kerikil (batu pecah mesin)

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

OH
OH
OH
OH

2.400
50,000.00
0.800
70,000.00
0.080
75,000.00
0.119
75,000.00
JUMLAH TENAGA KERJA

120,000.00
56,000.00
6,000.00
8,925.00
190,925.00

m3
kg
m3
m3

0.450
195,400.00
194.000
1,500.00
0.312
174,500.00
0.468
170,588.47
JUMLAH HARGA BAHAN

87,930.00
291,000.00
54,444.00
79,835.40
513,209.40

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

704,134.40
105,620.16
809,754.56

PEKERJAAN DINDING
A.4.4.1.2. Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Bata Merah
Semen Portland
Pasir Pasang

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.600
50,000.00
0.200
70,000.00
0.020
75,000.00
0.030
75,000.00
JUMLAH TENAGA KERJA

30,000.00
14,000.00
1,500.00
2,250.00
47,750.00

bh
Kg
m3

140.000
1,000.00
32.950
1,500.00
0.091
158,300.00
JUMLAH HARGA BAHAN

140,000.00
49,425.00
14,405.30
203,830.30

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

251,580.30
37,737.05
289,317.35

15% x D

A.4.4.1.4. Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Bata Merah
Semen Portland
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.600
50,000.00
0.200
70,000.00
0.020
75,000.00
0.030
75,000.00
JUMLAH TENAGA KERJA

30,000.00
14,000.00
1,500.00
2,250.00
47,750.00

bh
Kg
m3

140.000
1,000.00
22.200
1,500.00
0.102
158,300.00
JUMLAH HARGA BAHAN

140,000.00
33,300.00
16,146.60
189,446.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

237,196.60
35,579.49
272,776.09

15% x D

A.4.4.1.5. Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu

Satua Koefisie
Kode
n
n
L.01
L.02

OH
OH

0.600
0.200

Harga
Satuan
(Rp)
50,000.00
70,000.00

Jumlah
Harga
(Rp)
30,000.00
14,000.00

Kepala Tukang
Mandor
B

L.03
L.04

BAHAN
Bata Merah
Semen Portland
Pasir Pasang

OH
OH

0.020
75,000.00
0.030
75,000.00
JUMLAH TENAGA KERJA

1,500.00
2,250.00
47,750.00

bh
Kg
m3

140.000
1,000.00
18.500
1,500.00
0.122
158,300.00
JUMLAH HARGA BAHAN

140,000.00
27,750.00
19,312.60
187,062.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

234,812.60
35,221.89
270,034.49

15% x D

A.4.4.1.8. Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 3PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Bata Merah
Semen Portland
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

15,000.00
7,000.00
750.00
1,125.00
23,875.00

bh
Kg
m3

70.000
1,000.00
14.370
1,500.00
0.040
158,300.00
JUMLAH HARGA BAHAN

70,000.00
21,555.00
6,332.00
97,887.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

121,762.00
18,264.30
140,026.30

15% x D

A.4.4.1.10Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 5PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Bata Merah
Semen Portland
Pasir Pasang

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

15,000.00
7,000.00
750.00
1,125.00
23,875.00

bh
Kg
m3

70.000
1,000.00
9.680
1,500.00
0.045
158,300.00
JUMLAH HARGA BAHAN

70,000.00
14,520.00
7,123.50
91,643.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

115,518.50
17,327.78
132,846.28

15% x D

A.4.4.1.11Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 6PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Bata Merah
Semen Portland
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

15,000.00
7,000.00
750.00
1,125.00
23,875.00

bh
Kg
m3

70.000
1,000.00
8.320
1,500.00
0.049
158,300.00
JUMLAH HARGA BAHAN

70,000.00
12,480.00
7,756.70
90,236.70

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

114,111.70
17,116.76
131,228.46

15% x D

A.4.4.1.17Memasang Dinding Conblock HB20 camp. 1 PS : 4PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
HB-20
Semen Portland
Pasir Pasang
Besi angker dia 8

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.350
50,000.00
0.150
70,000.00
0.015
75,000.00
0.018
75,000.00
JUMLAH TENAGA KERJA

17,500.00
10,500.00
1,125.00
1,350.00
30,475.00

bh
Kg
m3
Kg

12.500
2,100.00
24.260
1,500.00
0.772
158,300.00
0.280
9,100.00
JUMLAH HARGA BAHAN

26,250.00
36,390.00
122,207.60
2,548.00
187,395.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

217,870.60
32,680.59
250,551.19

15% x D

A.4.4.1.19Memasang Dinding Conblock HB15 camp. 1 PS : 4PP

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
HB - 15
Semen Portland
Pasir Pasang
Besi angker dia 8

OH
OH
OH
OH

0.320
50,000.00
0.120
70,000.00
0.012
75,000.00
0.016
75,000.00
JUMLAH TENAGA KERJA

16,000.00
8,400.00
900.00
1,200.00
26,500.00

bh
Kg
m3
Kg

12.500
1,800.00
18.200
1,500.00
0.582
158,300.00
0.280
9,100.00
JUMLAH HARGA BAHAN

22,500.00
27,300.00
92,130.60
2,548.00
144,478.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

170,978.60
25,646.79
196,625.39

15% x D

A.4.4.1.21Memasang Dinding Conblock HB10 camp. 1 PS : 4PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
HB - 10
Semen Portland
Pasir Pasang
Besi angker dia 8

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

15,000.00
7,000.00
750.00
1,125.00
23,875.00

bh
Kg
m3
Kg

12.500
1,620.00
12.130
1,500.00
0.388
158,300.00
0.280
9,100.00
JUMLAH HARGA BAHAN

20,250.00
18,195.00
61,420.40
2,548.00
102,413.40

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

126,288.40
18,943.26
145,231.66

15% x D

PEKERJAAN PLESTERAN
A.4.4.2.3. Pemasangan 1m plesteran 1 PC :3 PP tebal 15 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Harga
Satuan
(Rp)

0.300
50,000.00
0.150
70,000.00
0.015
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
15,000.00
10,500.00
1,125.00
1,125.00
27,750.00

Portland Cement
Pasir Pasang
C

Kg
m3

7.776
1,500.00
0.023
158,300.00
JUMLAH HARGA BAHAN

11,664.00
3,640.90
15,304.90

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

43,054.90
6,458.24
49,513.14

15% x D

A.4.4.2.5. Pemasangan 1m plesteran 1 PC :5 PP tebal 15 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Portland Cement
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.300
50,000.00
0.150
70,000.00
0.015
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

15,000.00
10,500.00
1,125.00
1,125.00
27,750.00

Kg
m3

5.184
1,500.00
0.026
158,300.00
JUMLAH HARGA BAHAN

7,776.00
4,115.80
11,891.80

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

39,641.80
5,946.27
45,588.07

15% x D

A.4.4.2.6. Pemasangan 1m plesteran 1 PC :6 PP tebal 15 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Portland Cement
Pasir Pasang

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.300
50,000.00
0.150
70,000.00
0.015
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

15,000.00
10,500.00
1,125.00
1,125.00
27,750.00

Kg
m3

4.416
1,500.00
0.027
158,300.00
JUMLAH HARGA BAHAN

6,624.00
4,274.10
10,898.10

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

A.4.4.2.20Pemasangan 1m plesteran skoning 1 SP :3 PP lebar 10 cm

38,648.10
5,797.22
44,445.32

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Portland Cement
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.080
50,000.00
0.400
70,000.00
0.040
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

4,000.00
28,000.00
3,000.00
300.00
35,300.00

Kg
m3

0.500
1,500.00
0.013
158,300.00
JUMLAH HARGA BAHAN

750.00
2,057.90
2,807.90

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

38,107.90
5,716.19
43,824.09

15% x D

A.4.4.2.20Pemasangan 1m plesteran skoning 1 SP :3 PP lebar 10 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Portland Cement
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.080
50,000.00
0.040
70,000.00
0.004
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

4,000.00
2,800.00
300.00
300.00
7,400.00

Kg
m3

0.500
1,500.00
0.013
158,300.00
JUMLAH HARGA BAHAN

750.00
2,057.90
2,807.90

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

10,207.90
1,531.19
11,739.09

15% x D

A.4.4.2.23Pemasangan 1m plesteran ciprat 1 SP :2 PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Portland Cement
Pasir Pasang

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.300
50,000.00
0.100
70,000.00
0.010
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

15,000.00
7,000.00
750.00
1,125.00
23,875.00

Kg
m3

4.320
1,500.00
0.006
158,300.00
JUMLAH HARGA BAHAN

6,480.00
949.80
7,429.80

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

31,304.80
4,695.72
36,000.52

15% x D

A.4.4.2.24Pemasangan 1m finishing siar pasangan bata merah

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Portland Cement

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

7,500.00
5,250.00
600.00
600.00
13,950.00

Kg

3.108
1,500.00
JUMLAH HARGA BAHAN

4,662.00
4,662.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

18,612.00
2,791.80
21,403.80

15% x D

A.4.4.2.26Pemasangan 1m finishing siar pasangan batu kali, campuran 1 SP:2 PP

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Portland Cement
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.300
50,000.00
0.150
70,000.00
0.015
75,000.00
0.015
75,000.00
JUMLAH TENAGA KERJA

15,000.00
10,500.00
1,125.00
1,125.00
27,750.00

Kg
m3

6.340
1,500.00
0.012
158,300.00
JUMLAH HARGA BAHAN

9,510.00
1,899.60
11,409.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

39,159.60
5,873.94
45,033.54

15% x D

A.4.4.2.27Pemasangan 1m acian

No
A

Uraian
TENAGA

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

Pekerja
Tukang Batu
Kepala Tukang
Mandor
B

L.01
L.02
L.03
L.04

BAHAN
Portland Cement

OH
OH
OH
OH

0.200
50,000.00
0.100
70,000.00
0.010
75,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA

10,000.00
7,000.00
750.00
750.00
18,500.00

Kg

3.250
1,500.00
JUMLAH HARGA BAHAN

4,875.00
4,875.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

23,375.00
3,506.25
26,881.25

15% x D

PEKERJAAN BETON
A.4.1.1.1. Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA

82,500.00
19,250.00
2,100.00
6,225.00
110,075.00

Kg
Kg
Kg
ltr

247.000
1,500.00
869.000
124.64
999.000
121.85
215.000
100.00
JUMLAH HARGA BAHAN

370,500.00
108,314.64
121,727.06
21,500.00
622,041.70

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

732,116.70
109,817.51
841,934.21

15% x D

A.4.1.1.2. Membuat 1 m3 Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Kg
Kg
Kg
ltr

Harga
Satuan
(Rp)

1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA
276.000
828.000
###
215.000

1,500.00
124.64
121.85
100.00

Jumlah
Harga
(Rp)
82,500.00
19,250.00
2,100.00
6,225.00
110,075.00
414,000.00
103,204.29
123,311.09
21,500.00

JUMLAH HARGA BAHAN


C

662,015.38

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

772,090.38
115,813.56
887,903.94

15% x D

A.4.1.1.4. Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.200
50,000.00
0.200
70,000.00
0.020
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA

60,000.00
14,000.00
1,500.00
450.00
75,950.00

Kg
Kg
Kg
ltr

230.000
1,500.00
893.000
124.64
###
121.85
200.000
100.00
JUMLAH HARGA BAHAN

345,000.00
111,306.07
125,138.83
20,000.00
601,444.90

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

677,394.90
101,609.23
779,004.13

15% x D

A.4.1.1.5. Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA

82,500.00
19,250.00
2,100.00
6,225.00
110,075.00

Kg
Kg
Kg
ltr

326.000
1,500.00
760.000
124.64
###
121.85
215.000
100.00
JUMLAH HARGA BAHAN

489,000.00
94,728.57
125,382.53
21,500.00
730,611.10

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

840,686.10
126,102.91
966,789.01

A.4.1.1.7. Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA

82,500.00
19,250.00
2,100.00
6,225.00
110,075.00

Kg
Kg
Kg
ltr

371.000
1,500.00
698.000
124.64
###
121.85
215.000
100.00
JUMLAH HARGA BAHAN

556,500.00
87,000.71
127,575.81
21,500.00
792,576.52

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

902,651.52
135,397.73
1,038,049.25

15% x D

A.4.1.1.8. Membuat 1 m3 Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Semen Portland
Pasir Beton
Kerikil (maksimum 30 mm)
Air

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.650
50,000.00
0.275
70,000.00
0.028
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA

82,500.00
19,250.00
2,100.00
6,225.00
110,075.00

Kg
Kg
Kg
ltr

384.000
1,500.00
692.000
124.64
###
121.85
215.000
100.00
JUMLAH HARGA BAHAN

576,000.00
86,252.86
126,601.01
21,500.00
810,353.87

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

920,428.87
138,064.33
1,058,493.20

15% x D

CATATAN :
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
A.4.1.1.17Pembesian 10 kg dengan besi polos atau besi ulir

No
A

Uraian
TENAGA

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

Pekerja
Tukang Besi
Kepala Tukang
Mandor
B

L.01
L.02
L.03
L.04

BAHAN
Besi Beton (Polos/Ulir)
Kawat Beton

OH
OH
OH
OH

0.070
50,000.00
0.070
70,000.00
0.007
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

3,500.00
4,900.00
525.00
300.00
9,225.00

Kg
Kg

10.500
9,100.00
0.150
15,800.00
JUMLAH HARGA BAHAN

95,550.00
2,370.00
97,920.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)
Harga per-Kg

15% x D
A.4.1.1.17a

107,145.00
16,071.75
123,216.75
12,321.68

A.4.1.1.17Pembesian 1 kg dengan besi polos

No
A

Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Besi Beton (Polos/Ulir)
Kawat Beton

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.0070
50,000.00
0.0070
70,000.00
0.0007
75,000.00
0.0004
75,000.00
JUMLAH TENAGA KERJA

350.00
490.00
52.50
30.00
922.50

Kg
Kg

1.0500
9,100.00
0.0150
15,800.00
JUMLAH HARGA BAHAN

9,555.00
237.00
9,792.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

10,714.50
1,607.18
12,321.68

15% x D

A.4.1.1.17Pembesian 1 kg dengan besi ulir

No
A

Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Besi Beton (Polos/Ulir)
Kawat Beton

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.0070
50,000.00
0.0070
70,000.00
0.0007
75,000.00
0.0004
75,000.00
JUMLAH TENAGA KERJA

350.00
490.00
52.50
30.00
922.50

Kg
Kg

1.0500
9,250.00
0.0150
15,800.00
JUMLAH HARGA BAHAN

9,712.50
237.00
9,949.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

10,872.00
1,630.80
12,502.80

15% x D

A.4.1.1.19Pembesian 10 kg jaring kawat baja (wiremesh)

No
A

Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Jaring Kawat Baja dilas
Kawat Beton

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.025
50,000.00
0.025
70,000.00
0.025
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

1,250.00
1,750.00
1,875.00
75.00
4,950.00

Kg
Kg

10.200 #
#VALUE!
0.050
15,800.00
JUMLAH HARGA BAHAN
#VALUE!

790.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.1.1.20Pemasangan 1 m2 bekisting untuk pondasi

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 10 cm
Minyak Bekisting

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.520
50,000.00
0.260
70,000.00
0.026
75,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA

26,000.00
18,200.00
1,950.00
1,950.00
48,100.00

m3
Kg
Ltr

0.040
2,722,400.00
0.300
18,800.00
0.100
20,000.00
JUMLAH HARGA BAHAN

108,896.00
5,640.00
2,000.00
116,536.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

164,636.00
24,695.40
189,331.40

15% x D

A.4.1.1.20Pemasangan 1 m2 bekisting untuk pondasi (papan kayu lokal)

No
A

Uraian
TENAGA
Pekerja

Kode

L.01

Satua Koefisie
n
n
OH

0.520

Harga
Satuan
(Rp)
50,000.00

Jumlah
Harga
(Rp)
26,000.00

Tukang Kayu
Kepala Tukang
Mandor
B

L.02
L.03
L.04

BAHAN
Papan Kayu Lokal
Paku Biasa 5 - 10 cm
Minyak Bekisting

OH
OH
OH

0.260
70,000.00
0.026
75,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA

18,200.00
1,950.00
1,950.00
48,100.00

m3
Kg
Ltr

0.040
1,469,000.00
0.300
18,800.00
0.100
20,000.00
JUMLAH HARGA BAHAN

58,760.00
5,640.00
2,000.00
66,400.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

114,500.00
17,175.00
131,675.00

15% x D

A.4.1.1.21Pemasangan 1 m2 bekisting untuk sloof

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 10 cm
Minyak Bekisting

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.520
50,000.00
0.260
70,000.00
0.026
75,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA

26,000.00
18,200.00
1,950.00
1,950.00
48,100.00

m3
Kg
Ltr

0.045
2,722,400.00
0.300
18,800.00
0.100
20,000.00
JUMLAH HARGA BAHAN

122,508.00
5,640.00
2,000.00
130,148.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

178,248.00
26,737.20
204,985.20

15% x D

A.4.1.1.21Pemasangan 1 m2 bekisting untuk sloof (2x Pakai)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 10 cm
Minyak Bekisting
PERALATAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.520
50,000.00
0.260
70,000.00
0.026
75,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA

26,000.00
18,200.00
1,950.00
1,950.00
48,100.00

m3
Kg
Ltr

0.023
2,722,400.00
0.300
18,800.00
0.100
20,000.00
JUMLAH HARGA BAHAN

61,254.00
5,640.00
2,000.00
68,894.00

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

116,994.00
17,549.10
134,543.10

15% x D

A.4.1.1.22Pemasangan 1 m2 bekisting untuk kolom

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Kls. III
Triplek 9 mm
Dolken Ky Galam Dia 8-10
cm/4 m

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Lbr
Btg

0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.015
4,730,000.00
0.350
107,800.00
2.000
19,900.00
JUMLAH HARGA BAHAN

108,896.00
7,520.00
4,000.00
70,950.00
37,730.00
39,800.00
268,896.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

329,946.00
49,491.90
379,437.90

15% x D

A.4.1.1.22Pemasangan 1 m2 bekisting untuk kolom

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr

0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
JUMLAH HARGA BAHAN

108,896.00
7,520.00
4,000.00
120,416.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

A.4.1.1.22Pemasangan 1 m2 bekisting untuk kolom (2x pakai)

181,466.00
27,219.90
208,685.90

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr

0.020
2,722,400.00
0.400
18,800.00
0.200
20,000.00
JUMLAH HARGA BAHAN

54,448.00
7,520.00
4,000.00
65,968.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

127,018.00
19,052.70
146,070.70

15% x D

A.4.1.1.22Pemasangan 1 m2 bekisting untuk kolom (kolom ekspose tinggi maksimal 4 meter, 2x pakai)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Balok Kayu Lokal 5/7
Paku Biasa 5 - 12 cm
Minyak Bekisting
Stoot Bambu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
m3
Kg
Ltr
Btg

0.020
2,722,400.00
0.008
1,145,500.00
0.400
18,800.00
0.200
20,000.00
1.000
14,250.00
JUMLAH HARGA BAHAN

54,448.00
8,591.25
7,520.00
4,000.00
14,250.00
88,809.25

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

149,859.25
22,478.89
172,338.14

15% x D

A.4.1.1.23Pemasangan 1 m2 bekisting untuk balok

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Harga
Satuan
(Rp)

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Kls III
Triplek 9 mm
Dolken Ky Galam Dia 8-10
cm/4 m

m3
Kg
Ltr
m3
Lbr
Btg

0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.018
1,145,500.00
0.350
107,800.00
2.000
19,900.00
JUMLAH HARGA BAHAN

108,896.00
7,520.00
4,000.00
20,619.00
37,730.00
39,800.00
218,565.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

279,615.00
41,942.25
321,557.25

15% x D

A.4.1.1.23Pemasangan 1 m2 bekisting untuk balok

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr

0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
JUMLAH HARGA BAHAN

108,896.00
7,520.00
4,000.00
120,416.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

181,466.00
27,219.90
208,685.90

15% x D

A.4.1.1.23Pemasangan 1 m2 bekisting untuk balok (2x pakai)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Cetak Pinus
Balok Kayu Lokal 5/7
Paku Biasa 5 - 12 cm
Minyak Bekisting
PERALATAN

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
m3
Kg
Ltr

0.020
2,722,400.00
0.009
1,145,500.00
0.400
18,800.00
0.200
20,000.00
JUMLAH HARGA BAHAN

54,448.00
10,309.50
7,520.00
4,000.00
76,277.50

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

137,327.50
20,599.13
157,926.63

15% x D

A.4.1.1.23Pemasangan 1 m2 bekisting untuk balok (balok gantung tinggi maksimal 4 meter, 2x pakai)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal 5/7
Stoot Bambu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Btg

0.020
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.009
1,145,500.00
2.500
14,250.00
JUMLAH HARGA BAHAN

54,448.00
7,520.00
4,000.00
10,309.50
35,625.00
111,902.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

172,952.50
25,942.88
198,895.38

15% x D

A.4.1.1.24Pemasangan 1 m2 bekisting untuk lantai

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 9 mm
Dolken Ky Galam Dia 8-10
cm/4 m

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Lbr
Btg

0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.015
1,145,500.00
0.350
107,800.00
6.000
19,900.00
JUMLAH HARGA BAHAN

108,896.00
7,520.00
4,000.00
17,182.50
37,730.00
119,400.00
294,728.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

355,778.50
53,366.78
409,145.28

A.4.1.1.24Pemasangan 1 m2 bekisting untuk lantai (papan cetak kayu pinus)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Lbr
Btg

0.040
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.015
1,145,500.00
0.350
84,700.00
6.000
14,250.00
JUMLAH HARGA BAHAN

108,896.00
7,520.00
4,000.00
17,182.50
29,645.00
85,500.00
252,743.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

313,793.50
47,069.03
360,862.53

15% x D

A.4.1.1.24Pemasangan 1 m2 bekisting untuk lantai (papan cetak kayu lokal)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Kayu Lokal
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Lbr
Btg

0.040
1,469,000.00
0.400
18,800.00
0.200
20,000.00
0.015
1,145,500.00
0.350
84,700.00
6.000
14,250.00
JUMLAH HARGA BAHAN

58,760.00
7,520.00
4,000.00
17,182.50
29,645.00
85,500.00
202,607.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

263,657.50
39,548.63
303,206.13

15% x D

A.4.1.1.25Pemasangan 1 m2 bekisting untuk dinding

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 9 mm
Dolken Ky Galam Dia 8-10
cm/4
m jarak bekisting/spacer
Penjaga

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Lbr
Btg
Buah

0.030
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.020
1,145,500.00
0.350
107,800.00
3.000
19,900.00
4.000
5,000.00
JUMLAH HARGA BAHAN

81,672.00
7,520.00
4,000.00
22,910.00
37,730.00
59,700.00
20,000.00
233,532.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

294,582.00
44,187.30
338,769.30

15% x D

A.4.1.1.25Pemasangan 1 m2 bekisting untuk dinding

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m
Penjaga jarak bekisting/spacer

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Lbr
Btg
Buah

0.030
2,722,400.00
0.400
18,800.00
0.200
20,000.00
0.020
1,145,500.00
0.350
84,700.00
3.000
14,250.00
4.000
5,000.00
JUMLAH HARGA BAHAN

81,672.00
7,520.00
4,000.00
22,910.00
29,645.00
42,750.00
20,000.00
208,497.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

269,547.00
40,432.05
309,979.05

15% x D

A.4.1.1.25Pemasangan 1 m2 bekisting untuk dinding 1 sisi (papan cetak kayu lokal)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu

Satua Koefisie
Kode
n
n
L.01
L.02

OH
OH

0.660
0.330

Harga
Satuan
(Rp)
50,000.00
70,000.00

Jumlah
Harga
(Rp)
33,000.00
23,100.00

Kepala Tukang
Mandor
B

L.03
L.04

BAHAN
Papan Cetak Kayu Lokal
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m

OH
OH

0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Lbr
Btg

0.030
1,469,000.00
0.400
18,800.00
0.200
20,000.00
0.020
1,145,500.00
0.350
84,700.00
3.000
14,250.00
JUMLAH HARGA BAHAN

44,070.00
7,520.00
4,000.00
22,910.00
29,645.00
42,750.00
150,895.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

211,945.00
31,791.75
243,736.75

15% x D

A.4.1.1.25Pemasangan 1 m2 bekisting untuk dinding 2 sisi (papan cetak kayu lokal)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Kayu Lokal
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.990
50,000.00
0.495
70,000.00
0.050
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA

49,500.00
34,650.00
3,712.50
3,712.50
91,575.00

m3
Kg
Ltr
m3
Lbr
Btg

0.060
1,469,000.00
0.800
18,800.00
0.400
20,000.00
0.040
1,145,500.00
0.700
84,700.00
6.000
14,250.00
JUMLAH HARGA BAHAN

88,140.00
15,040.00
8,000.00
45,820.00
59,290.00
85,500.00
301,790.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

393,365.00
59,004.75
452,369.75

15% x D

A.4.1.1.26Pemasangan 1 m2 bekisting untuk tangga

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Klas III

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

OH
OH
OH
OH

m3

Harga
Satuan
(Rp)

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA
0.030

2,722,400.00

Jumlah
Harga
(Rp)
33,000.00
23,100.00
2,475.00
2,475.00
61,050.00
81,672.00

Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Klas II
Plywood tebal 9mm
Dolken Ky Galam Dia 8-10
cm/4 m
C

Kg
Ltr
m3
Lbr
Btg

0.400
18,800.00
0.150
20,000.00
0.015
4,730,000.00
0.350
107,800.00
2.000
19,900.00
JUMLAH HARGA BAHAN

7,520.00
3,000.00
70,950.00
37,730.00
39,800.00
240,672.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

301,722.00
45,258.30
346,980.30

15% x D

A.4.1.1.26Pemasangan 1 m2 bekisting untuk tangga

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Cetak Pinus
Paku Biasa 5 - 12 cm
Minyak Bekisting
Balok Kayu Lokal
Triplek 3 mm
Bambu Dia 8-10 cm/4 m

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.660
50,000.00
0.330
70,000.00
0.033
75,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

33,000.00
23,100.00
2,475.00
2,475.00
61,050.00

m3
Kg
Ltr
m3
Lbr
Btg

0.030
2,722,400.00
0.400
18,800.00
0.150
20,000.00
0.015
1,145,500.00
0.350
84,700.00
2.000
14,250.00
JUMLAH HARGA BAHAN

81,672.00
7,520.00
3,000.00
17,182.50
29,645.00
28,500.00
167,519.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

228,569.50
34,285.43
262,854.93

15% x D

A.4.1.1.27Pemasangan 1 m2 bekisting untuk plat penutup saluran (papan cetak kayu lokal)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Terentang (Papan Kayu
Lokal)
Paku Biasa 5 - 12 cm
Bambu Dia 8-10 cm/4 m
PERALATAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.150
50,000.00
0.050
70,000.00
0.005
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

7,500.00
3,500.00
375.00
600.00
11,975.00

m3
kg
btg

0.026
1,469,000.00
0.600
18,800.00
0.500
14,250.00
JUMLAH HARGA BAHAN

38,781.60
11,280.00
7,125.00
57,186.60

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

69,161.60
10,374.24
79,535.84

15% x D

PEKERJAAN BETON PRACETAK


A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai )

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Lantai kerja tebal 10 cm
Besi hollow 50.50.3
Kayu kaso 5/7
Phenol film 12mm
Minyak begisting
Dinabolt dia 12mm (10-15cm)

Satua Koefisie
Kode
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.007
50,000.00
0.076
70,000.00
0.008
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

350.00
5,320.00
600.00
75.00
6,345.00

A.4.1
.1.4

m3
Kg
m3
Lbr
L
Bh

0.080
779,004.13
62,320.33
9.394
12,800.00
120,243.20
0.005
4,730,000.00
23,650.00
0.080 #
#VALUE!
0.200
20,000.00
4,000.00
3.882
7,920.00
30,745.44
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai )

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kayu kaso 5/7
Phenol film 12mm
Minyak begisting
Dinabolt dia 12mm (10-15cm)

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.004
50,000.00
0.038
70,000.00
0.004
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

200.00
2,660.00
300.00
75.00
3,235.00

m3
Lbr
L
Bh

0.005
4,730,000.00
23,650.00
0.043 #
#VALUE!
0.200
20,000.00
4,000.00
0.693
7,920.00
5,488.56
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

#VALUE!
#VALUE!
#VALUE!

A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10-12 kali pakai )

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kayu kaso 5/7
Phenol film 12mm
Minyak begisting
Paku 5-7 cm
Dinabolt dia 12mm (10-15cm)

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.004
50,000.00
0.038
70,000.00
0.004
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

200.00
2,660.00
300.00
75.00
3,235.00

m3
Lbr
L
Kg
Bh

0.004
4,730,000.00
18,920.00
0.048 #
#VALUE!
0.200
20,000.00
4,000.00
0.046
18,800.00
864.80
0.693
7,920.00
5,488.56
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Mandor

BAHAN

PERALATAN

D
E
F

Kode

L.01
L.04

Satua Koefisie
n
n
OH
OH
OH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Harga
Satuan
(Rp)

0.053
50,000.00
0.018
70,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
2,650.00
1,260.00
375.00
4,285.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

4,285.00
642.75
4,927.75

15% x D

A.4.1.2.9. Pemasangan dan membuka begisting 1 buah komponen balok beton pracetak

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Mandor

Kode

L.01
L.04

Satua Koefisie
n
n
OH
OH
OH

Harga
Satuan
(Rp)

0.089
50,000.00
0.030
70,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
4,450.00
2,100.00
375.00
6,925.00

BAHAN
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

6,925.00
1,038.75
7,963.75

15% x D

A.4.1.2.10Pemasangan dan membuka begisting 1 buah komponen kolom beton pracetak

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Mandor

BAHAN

PERALATAN

D
E
F

Kode

L.01
L.04

Satua
Koefisien
n
OH
OH
OH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Harga
Satuan
(Rp)

0.071
50,000.00
0.024
70,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
3,550.00
1,680.00
375.00
5,605.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

5,605.00
840.75
6,445.75

15% x D

A.4.1.2.11Penuangan/menebar beton untuk 1 buah komponen plat pracetak

No
A

B
C

D
E
F

Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Vibrator
Kepala Tukang
Mandor

Kode

L.01
L.02
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH
OH

Harga
Satuan
(Rp)

0.064
50,000.00
0.244
70,000.00
0.128
70,000.00
0.034
75,000.00
0.073
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
3,200.00
17,080.00
8,960.00
2,550.00
5,475.00
37,265.00

BAHAN
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

37,265.00
5,589.75
42,854.75

15% x D

A.4.1.2.12Penuangan/menebar beton untuk 1 buah komponen balok pracetak

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Vibrator

Kode

L.01
L.02
L.02

Satua Koefisie
n
n
OH
OH
OH

0.069
0.242
0.138

Harga
Satuan
(Rp)
50,000.00
70,000.00
70,000.00

Jumlah
Harga
(Rp)
3,450.00
16,940.00
9,660.00

Kepala Tukang
Mandor
B
C

D
E
F

L.03
L.04

OH
OH

0.037
75,000.00
0.073
75,000.00
JUMLAH TENAGA KERJA

2,775.00
5,475.00
38,300.00

BAHAN
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

38,300.00
5,745.00
44,045.00

15% x D

A.4.1.2.13Penuangan/menebar beton untuk 1 buah komponen kolom pracetak

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Vibrator
Kepala Tukang
Mandor

BAHAN

PERALATAN

D
E
F

Satua Koefisie
Kode
n
n
L.01
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Harga
Satuan
(Rp)

0.061
50,000.00
0.213
70,000.00
0.122
70,000.00
0.033
75,000.00
0.073
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
3,050.00
14,910.00
8,540.00
2,475.00
5,475.00
34,450.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

34,450.00
5,167.50
39,617.50

15% x D

A.4.1.2.14Mendirikan 1 buah komponen plat pracetak

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Erection
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.02
L.03
L.04

BAHAN
Solar
PERALATAN
Sewa Crane
Sewa Pipe Support

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

E51

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH
OH

0.067
50,000.00
0.067
70,000.00
0.134
70,000.00
0.067
75,000.00
0.067
75,000.00
JUMLAH TENAGA KERJA

3,350.00
4,690.00
9,380.00
5,025.00
5,025.00
27,470.00

6.676
9,200.00
JUMLAH HARGA BAHAN

61,419.20
61,419.20

UH
UH

0.067
384,114.29
25,735.66
1.100 #
#VALUE!
JUMLAH HARGA ALAT
#VALUE!

15% x D

#VALUE!
#VALUE!
#VALUE!

A.4.1.2.15Mendirikan 1 buah komponen balok pracetak

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Erection
Operator Crane
Pembantu Operator Crane
Kepala Tukang
Mandor

Kode

L.01
L.02
L.02

L.03
L.04

BAHAN
Solar
PERALATAN
Sewa Crane
Sewa Schaffolding

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH
OH
OH
OH

0.061
50,000.00
0.061
70,000.00
0.122
70,000.00
0.061
65,000.00
0.061
45,000.00
0.061
75,000.00
0.061
75,000.00
JUMLAH TENAGA KERJA

3,050.00
4,270.00
8,540.00
3,965.00
2,745.00
4,575.00
4,575.00
31,720.00

6.110
9,200.00
JUMLAH HARGA BAHAN

56,212.00
56,212.00

UH
UH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

0.061
384,114.29
23,430.97
1.100 #
#VALUE!
JUMLAH HARGA ALAT
#VALUE!
#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.1.2.16Mendirikan 1 buah komponen kolom pracetak

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Erection
Operator Crane
Pembantu Operator Crane
Kepala Tukang
Mandor

Kode

L.01
L.02
L.02

L.03
L.04

BAHAN
Solar
PERALATAN
Sewa Crane
Sewa Pipe Support

E51

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH
OH
OH
OH

0.083
50,000.00
0.083
70,000.00
0.166
70,000.00
0.083
65,000.00
0.083
45,000.00
0.083
75,000.00
0.083
75,000.00
JUMLAH TENAGA KERJA

4,150.00
5,810.00
11,620.00
5,395.00
3,735.00
6,225.00
6,225.00
43,160.00

8.277
9,200.00
JUMLAH HARGA BAHAN

76,148.40
76,148.40

UH
UH

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

0.083
384,114.29
31,881.49
2.200 #
#VALUE!
JUMLAH HARGA ALAT
#VALUE!
#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.1.2.17Melangsir 1 buah komponen plat pracetak ( 20 m )

No
A

Uraian
TENAGA
Pekerja

Kode

L.01

Satua Koefisie
n
n
OH

0.019

Harga
Satuan
(Rp)
50,000.00

Jumlah
Harga
(Rp)
950.00

Tukang Batu
Operator Crane
Pembantu Operator Crane
B

D
E
F

L.02

BAHAN
Solar
PERALATAN
Sewa Crane

E51

OH
OH
OH

0.038
70,000.00
0.019
65,000.00
0.019
45,000.00
JUMLAH TENAGA KERJA

2,660.00
1,235.00
855.00
5,700.00

1.897
9,200.00
JUMLAH HARGA BAHAN

17,452.40
17,452.40

UH

0.019
384,114.29
JUMLAH HARGA ALAT

7,298.17
7,298.17
7,298.17
30,450.57
4,567.59
35,018.16

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

A.4.1.2.18Melangsir 1 buah komponen balok pracetak ( 20 m )

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Batu
Operator Crane
Pembantu Operator Crane

Kode

L.01
L.02

BAHAN
Solar
PERALATAN
Sewa Crane

E51

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.019
50,000.00
0.038
70,000.00
0.019
65,000.00
0.019
45,000.00
JUMLAH TENAGA KERJA

950.00
2,660.00
1,235.00
855.00
5,700.00

1.897
9,200.00
JUMLAH HARGA BAHAN

17,452.40
17,452.40

UH

0.019
384,114.29
JUMLAH HARGA ALAT

7,298.17
7,298.17

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

30,450.57
4,567.59
35,018.16

15% x D

A.4.1.2.19Melangsir 1 buah komponen kolom pracetak ( 20 m )

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Batu
Operator Crane
Pembantu Operator Crane

Kode

L.01
L.02

BAHAN
Solar
PERALATAN
Sewa Crane

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

E51

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.019
50,000.00
0.038
70,000.00
0.019
65,000.00
0.019
45,000.00
JUMLAH TENAGA KERJA

950.00
2,660.00
1,235.00
855.00
5,700.00

1.897
9,200.00
JUMLAH HARGA BAHAN

17,452.40
17,452.40

UH

0.019
384,114.29
JUMLAH HARGA ALAT

7,298.17
7,298.17

15% x D

30,450.57
4,567.59
35,018.16

A.4.1.2.20Bahan 1 m3 grouting campuran

No

Uraian

TENAGA

BAHAN
Semen Grout
Screening
Air

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

JUMLAH TENAGA KERJA

Kg
Kg
L

1,200.00 #
#VALUE!
650.00 #
#VALUE!
350.00
100.00
35,000.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.1.2.21Bahan 1 m3 grouting tidak campuran

No

Uraian

TENAGA

BAHAN
Semen Grout
Air

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

JUMLAH TENAGA KERJA

Kg
L

1,850.00 #
#VALUE!
400.00
100.00
40,000.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.1.2.22Upah melakukan 1 titik grouting pada join pracetak

No
A

Uraian
TENAGA
Tukang Batu
Kepala Tukang
Mandor

BAHAN

PERALATAN

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Kode

L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH

Harga
Satuan
(Rp)

0.367
70,000.00
0.074
75,000.00
0.037
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
25,690.00
5,550.00
2,775.00
34,015.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

15% x D

34,015.00
5,102.25
39,117.25

A.4.1.2.23Pemasangan 1 titik bekisting join pracetak

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kayu kaso 5/7
Papan cor
Paku 5-7 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.147
50,000.00
0.147
70,000.00
0.015
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

7,350.00
10,290.00
1,125.00
375.00
19,140.00

m3
m3
Kg

0.012
4,730,000.00
0.004
1,469,000.00
0.264
18,800.00
JUMLAH HARGA BAHAN

56,760.00
5,876.00
4,963.20
67,599.20

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

86,739.20
13,010.88
99,750.08

15% x D

A.4.1.2.24Upah 1 titik Join dengan Sling

No
A

B
C

D
E
F

Uraian
TENAGA
Pekerja
Tukang Batu
Tukang Besi
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.02
L.04

OH
OH
OH
OH

Harga
Satuan
(Rp)

0.220
50,000.00
0.220
70,000.00
0.220
70,000.00
0.110
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
11,000.00
15,400.00
15,400.00
8,250.00
50,050.00

BAHAN
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

50,050.00
7,507.50
57,557.50

15% x D

PEKERJAAN PENUTUP LANTAI DAN DINDING


A.4.4.3.9. Pemasangan 1m lantai ubin granit ukuran 40cm x 40cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Harga
Satuan
(Rp)

0.250
50,000.00
0.125
70,000.00
0.013
75,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
12,500.00
8,750.00
975.00
975.00
23,200.00

Ubin granit
Semen Portlan
Semen Warna
Pasir pasang
C

Bh
kg
kg
m3

6.630
28,216.67
9.800
1,500.00
1.300
2,300.00
0.045
158,300.00
JUMLAH HARGA BAHAN

187,076.50
14,700.00
2,990.00
7,123.50
211,890.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

235,090.00
35,263.50
270,353.50

15% x D

A.4.4.3.10Pemasangan 1m lantai ubin granit ukuran 30cm x 30cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Ubin granit
Semen Portlan
Semen Warna
Pasir pasang

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.260
50,000.00
0.130
70,000.00
0.013
75,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA

13,000.00
9,100.00
975.00
975.00
24,050.00

Bh
kg
kg
m3

11.870
11,363.64
10.000
1,500.00
1.500
2,300.00
0.045
158,300.00
JUMLAH HARGA BAHAN

134,886.36
15,000.00
3,450.00
7,123.50
160,459.86

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

184,509.86
27,676.48
212,186.34

15% x D

A.4.4.3.24Pemasangan 1m plint ubin granit ukuran 10cm x 40cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint Ubin granit
Semen Portlan
Semen Warna
Pasir pasang

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.090
50,000.00
0.090
70,000.00
0.009
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

4,500.00
6,300.00
675.00
375.00
11,850.00

Bh
kg
kg
m3

2.650
4,400.00
1.140
1,500.00
0.100
2,300.00
0.003
158,300.00
JUMLAH HARGA BAHAN

11,660.00
1,710.00
230.00
474.90
14,074.90

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

25,924.90
3,888.74
29,813.64

15% x D

A.4.4.3.25Pemasangan 1m plint ubin granit ukuran 10cm x 30cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Plint Ubin granit
Semen Portlan
Semen Warna
Pasir pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.090
50,000.00
0.090
70,000.00
0.009
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

4,500.00
6,300.00
675.00
375.00
11,850.00

Bh
kg
kg
m3

3.530
3,850.00
1.140
1,500.00
0.100
2,300.00
0.003
158,300.00
JUMLAH HARGA BAHAN

13,590.50
1,710.00
230.00
474.90
16,005.40

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

27,855.40
4,178.31
32,033.71

15% x D

A.4.4.3.35Pemasangan 1m lantai keramik ukuran 30cm x 30cm (putih polos)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Ubin keramik
Semen Portlan
Pasir pasang
Semen Warna

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA

35,000.00
24,500.00
2,625.00
2,625.00
64,750.00

Bh
kg
m3
kg

11.870
4,400.00
10.000
1,500.00
0.045
158,300.00
1.500
2,300.00
JUMLAH HARGA BAHAN

52,228.00
15,000.00
7,123.50
3,450.00
77,801.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

142,551.50
21,382.73
163,934.23

15% x D

A.4.4.3.35Pemasangan 1m lantai keramik ukuran 40cm x 40cm (putih polos)

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Keramik
Semen Portlan
Semen Warna
Pasir pasang

OH
OH
OH
OH

0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA

35,000.00
24,500.00
2,625.00
2,625.00
64,750.00

Bh
kg
kg
m3

6.630
8,700.00
10.000
1,500.00
1.500
2,300.00
0.045
158,300.00
JUMLAH HARGA BAHAN

57,681.00
15,000.00
3,450.00
7,123.50
83,254.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

148,004.50
22,200.68
170,205.18

15% x D

A.4.4.3.35Pemasangan 1m lantai keramik ukuran 30cm x 30cm (warna)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Ubin keramik
Semen Portlan
Pasir pasang
Semen Warna

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA

35,000.00
24,500.00
2,625.00
2,625.00
64,750.00

Bh
kg
m3
kg

11.870
4,681.82
10.000
1,500.00
0.045
158,300.00
1.500
2,300.00
JUMLAH HARGA BAHAN

55,573.18
15,000.00
7,123.50
3,450.00
81,146.68

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

145,896.68
21,884.50
167,781.18

15% x D

A.4.4.3.35Pemasangan 1m lantai keramik ukuran 40cm x 40cm (warna)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Keramik
Semen Portlan

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Bh
kg

Harga
Satuan
(Rp)

0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
6.630
10.000

9,366.67
1,500.00

Jumlah
Harga
(Rp)
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
62,101.00
15,000.00

Semen Warna
Pasir pasang
C

kg
m3

1.500
2,300.00
0.045
158,300.00
JUMLAH HARGA BAHAN

3,450.00
7,123.50
87,674.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

152,424.50
22,863.68
175,288.18

15% x D

A.4.4.3.36Pemasangan 1m lantai keramik ukuran 20cm x 20cm (anti slip)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Ubin keramik
Semen Portlan
Pasir pasang
Semen warna

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA

35,000.00
24,500.00
2,625.00
2,625.00
64,750.00

Bh
kg
m3
kg

26.500
2,184.00
10.400
1,500.00
0.045
158,300.00
1.620
2,300.00
JUMLAH HARGA BAHAN

57,876.00
15,600.00
7,123.50
3,726.00
84,325.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

149,075.50
22,361.33
171,436.83

15% x D

A.4.4.3.39Pemasangan 1m plint keramik ukuran 10cm x 20cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Plint keramik
Semen Portlan
Pasir Pasang
Semen Warna

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.090
50,000.00
0.090
70,000.00
0.035
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

4,500.00
6,300.00
2,625.00
375.00
13,800.00

Bh
kg
m3
kg

5.300
5,000.00
1.140
1,500.00
0.003
158,300.00
0.025
2,300.00
JUMLAH HARGA BAHAN

26,500.00
1,710.00
474.90
57.50
28,742.40

PERALATAN
JUMLAH HARGA ALAT

D
E

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%

15% x D

42,542.40
6,381.36

Harga Satuan Pekerjaan (D+E)

48,923.76

A.4.4.3.41Pemasangan 1m plint keramik ukuran 5 cm x 20cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Plint keramik
Semen Portlan
Pasir Pasang
Semen Warna

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.090
50,000.00
0.090
70,000.00
0.035
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

4,500.00
6,300.00
2,625.00
375.00
13,800.00

Bh
kg
m3
kg

5.300
2,750.00
0.570
1,500.00
0.002
158,300.00
0.013
2,300.00
JUMLAH HARGA BAHAN

14,575.00
855.00
237.45
29.90
15,697.35

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

29,497.35
4,424.60
33,921.95

15% x D

A.4.4.3.43Pemasangan 1m lantai marmer ukuran 100 cm x 100 cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Marmer
Semen Portlan
Pasir pasang
Semen warna

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA

35,000.00
24,500.00
2,625.00
2,625.00
64,750.00

Bh
kg
m3
kg

1.060 #
#VALUE!
8.190
1,500.00
12,285.00
0.045
158,300.00
7,123.50
0.650
2,300.00
1,495.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.4.3.44Pemasangan 1m lantai karpet

No
A

Uraian
TENAGA
Pekerja

Kode

L.01

Satua Koefisie
n
n
OH

0.170

Harga
Satuan
(Rp)
50,000.00

Jumlah
Harga
(Rp)
8,500.00

Tukang Kayu
Kepala Tukang
Mandor
B

L.02
L.03
L.04

BAHAN
Karpet
Lem

OH
OH
OH

0.170
70,000.00
0.017
75,000.00
0.009
75,000.00
JUMLAH TENAGA KERJA

11,900.00
1,275.00
675.00
22,350.00

m2
Kg

1.050
15,200.00
0.350
23,000.00
JUMLAH HARGA BAHAN

15,960.00
8,050.00
24,010.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

46,360.00
6,954.00
53,314.00

15% x D

A.4.4.3.45Pemasangan 1m underlayer (pelapis bawah karpet)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Underlayer
Lem

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.120
50,000.00
0.120
70,000.00
0.012
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA

6,000.00
8,400.00
900.00
450.00
15,750.00

m2
Kg

1.050 #
#VALUE!
0.350
23,000.00
8,050.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.4.3.46Pemasangan 1m lantai parquet kayu

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Parquet
Lem

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA

35,000.00
24,500.00
2,625.00
2,625.00
64,750.00

m2
Kg

1.050 #
#VALUE!
0.600
23,000.00
13,800.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

Jumlah (A+B+C)

#VALUE!

E
F

Overhead + Profit 15%


Harga Satuan Pekerjaan (D+E)

15% x D

#VALUE!
#VALUE!

A.4.4.3.51Pemasangan 1m dinding keramik artistik 10 cm x 20 cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Keramik Artistik
Semen Portland
Pasir Pasang
Semen Warna

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.900
50,000.00
0.450
70,000.00
0.045
75,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA

45,000.00
31,500.00
3,375.00
3,375.00
83,250.00

Bh
Kg
m3
Kg

53.000 #
#VALUE!
9.300
1,500.00
13,950.00
0.018
158,300.00
2,849.40
2.750
2,300.00
6,325.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.4.3.53Pemasangan 1m dinding keramik 10 cm x 20 cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Keramik
Semen Portland
Pasir Pasang
Semen Warna

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.900
50,000.00
0.450
70,000.00
0.045
75,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA

45,000.00
31,500.00
3,375.00
3,375.00
83,250.00

Bh
Kg
m3
Kg

53.000
1,100.00
9.300
1,500.00
0.018
158,300.00
2.750
2,300.00
JUMLAH HARGA BAHAN

58,300.00
13,950.00
2,849.40
6,325.00
81,424.40

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

164,674.40
24,701.16
189,375.56

15% x D

A.4.4.3.54Pemasangan 1m dinding keramik 20 cm x 20 cm

No
A

Uraian
TENAGA

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

Pekerja
Tukang Batu
Kepala Tukang
Mandor
B

L.01
L.02
L.03
L.04

BAHAN
Keramik
Semen Portland
Pasir Pasang
Semen Warna

OH
OH
OH
OH

0.900
50,000.00
0.450
70,000.00
0.045
75,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA

45,000.00
31,500.00
3,375.00
3,375.00
83,250.00

Bh
Kg
m3
Kg

26.500
2,150.00
9.300
1,500.00
0.018
158,300.00
1.940
2,300.00
JUMLAH HARGA BAHAN

56,975.00
13,950.00
2,849.40
4,462.00
78,236.40

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

161,486.40
24,222.96
185,709.36

15% x D

A.4.4.3.54Pemasangan 1m dinding keramik 20 cm x 25 cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Keramik
Semen Portland
Pasir Pasang
Semen Warna

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.900
50,000.00
0.450
70,000.00
0.045
75,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA

45,000.00
31,500.00
3,375.00
3,375.00
83,250.00

Bh
Kg
m3
Kg

21.200
2,730.00
9.300
1,500.00
0.018
158,300.00
1.940
2,300.00
JUMLAH HARGA BAHAN

57,876.00
13,950.00
2,849.40
4,462.00
79,137.40

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

162,387.40
24,358.11
186,745.51

15% x D

A.4.4.3.58Pemasangan 1m dinding batu tempel hitam

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu tempel hitam
Semen Portland
Pasir Pasang

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

m2
Kg
m3

Harga
Satuan
(Rp)

0.700
50,000.00
0.350
70,000.00
0.035
75,000.00
0.035
75,000.00
JUMLAH TENAGA KERJA
1.100
11.750
0.035

120,000.00
1,500.00
158,300.00

Jumlah
Harga
(Rp)
35,000.00
24,500.00
2,625.00
2,625.00
64,750.00
132,000.00
17,625.00
5,540.50

JUMLAH HARGA BAHAN


C

155,165.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

219,915.50
32,987.33
252,902.83

15% x D

A.4.4.3.60Pemasangan 1m wallpaper lebar 50 cm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Wallpaper
Lem

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.350
50,000.00
0.175
70,000.00
0.017
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

17,500.00
12,250.00
1,275.00
150.00
31,175.00

m
Kg

2.200
64,800.00
0.250
23,000.00
JUMLAH HARGA BAHAN

142,560.00
5,750.00
148,310.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

179,485.00
26,922.75
206,407.75

15% x D

A.4.4.3.61Pemasangan 1m floor hardener

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Floor Hardener

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Kg

Harga
Satuan
(Rp)

0.120
50,000.00
0.120
70,000.00
0.012
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA
5.000 #
JUMLAH HARGA BAHAN

Jumlah
Harga
(Rp)
6,000.00
8,400.00
900.00
450.00
15,750.00
#VALUE!
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

#VALUE!
#VALUE!
#VALUE!

PEKERJAAN KAYU
A.4.6.1.1 Pembuatan dan Pemasangan 1 m kusen pintu dan kusen jendela, kayu kelas I

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok kayu (Jati Perum)
Paku 10 cm
Lem kayu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

7.000
50,000.00
21.000
70,000.00
2.100
75,000.00
0.350
75,000.00
JUMLAH TENAGA KERJA

350,000.00
1,470,000.00
157,500.00
26,250.00
2,003,750.00

m3
Kg
kg

1.100 10,540,400.00
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN

11,594,440.00
26,250.00
16,000.00
11,636,690.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

13,640,440.00
2,046,066.00
15,686,506.00

15% x D

A.4.6.1.2. Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu kelas II & III

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok Kayu (Kruing)
Paku 10 cm
Lem kayu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

6.000
50,000.00
18.000
70,000.00
1.800
75,000.00
0.300
75,000.00
JUMLAH TENAGA KERJA

300,000.00
1,260,000.00
135,000.00
22,500.00
1,717,500.00

m3
kg
kg

1.200
6,470,000.00
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN

7,764,000.00
26,250.00
16,000.00
7,806,250.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

9,523,750.00
1,428,562.50
10,952,312.50

15% x D

A.4.6.1.2a Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu jati (perum)

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu (Jati Perum)

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

OH
OH
OH
OH

m3

Harga
Satuan
(Rp)

6.000
50,000.00
18.000
70,000.00
1.800
75,000.00
0.300
75,000.00
JUMLAH TENAGA KERJA
1.200

10,540,400.00

Jumlah
Harga
(Rp)
300,000.00
1,260,000.00
135,000.00
22,500.00
1,717,500.00
12,648,480.00

Paku 10 cm
Lem kayu
C

kg
kg

1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN

26,250.00
16,000.00
12,690,730.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

14,408,230.00
2,161,234.50
16,569,464.50

15% x D

A.4.6.1.2b Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok Kayu (Bengkirai)
Paku 10 cm
Lem kayu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

6.000
50,000.00
18.000
70,000.00
1.800
75,000.00
0.300
75,000.00
JUMLAH TENAGA KERJA

300,000.00
1,260,000.00
135,000.00
22,500.00
1,717,500.00

m3
kg
kg

1.200 10,466,700.00
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN

12,560,040.00
26,250.00
16,000.00
12,602,290.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

14,319,790.00
2,147,968.50
16,467,758.50

15% x D

A.4.6.1.2c Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu (Kruing)
Paku 10 cm
Lem kayu

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

OH
OH
OH
OH

6.000
50,000.00
18.000
70,000.00
1.800
75,000.00
0.300
75,000.00
JUMLAH TENAGA KERJA

300,000.00
1,260,000.00
135,000.00
22,500.00
1,717,500.00

m3
kg
kg

1.200
6,350,000.00
1.250
21,000.00
1.000
16,000.00
JUMLAH HARGA BAHAN

7,620,000.00
26,250.00
16,000.00
7,662,250.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

9,379,750.00
1,406,962.50
10,786,712.50

A.4.6.1.5. Pembuatan dan pemasangan 1 m daun pintu panel, kayu kelas I & II

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan kayu (Jati)
Lem kayu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.000
50,000.00
3.000
70,000.00
0.300
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA

50,000.00
210,000.00
22,500.00
3,750.00
286,250.00

m3
kg

0.040 10,826,400.00
0.500
16,000.00
JUMLAH HARGA BAHAN

433,056.00
8,000.00
441,056.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
727,306.00
Overhead + Profit 15%
Overh
15% x D
109,095.90
ead
+
Harga Satuan Pekerjaan (D+E)
836,401.90
Profit
15%
A.4.6.1.5a Pembuatan dan pemasangan
1 m daun pintu panel, kayu jati (perum)

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Kayu Jati (Perum)
Lem kayu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.000
50,000.00
3.000
70,000.00
0.300
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA

50,000.00
210,000.00
22,500.00
3,750.00
286,250.00

m3
kg

0.040 10,826,400.00
0.500
16,000.00
JUMLAH HARGA BAHAN

433,056.00
8,000.00
441,056.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
15% x D
Overh
Harga Satuan Pekerjaan (D+E) ead +
Profit
15%
A.4.6.1.5b Pembuatan dan pemasangan
1 m daun pintu panel, kayu bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Papan Kayu Bengkirai

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

OH
OH
OH
OH

m3

Harga
Satuan
(Rp)

1.000
50,000.00
3.000
70,000.00
0.300
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA
0.040

11,925,000.00

727,306.00
109,095.90
836,401.90

Jumlah
Harga
(Rp)
50,000.00
210,000.00
22,500.00
3,750.00
286,250.00
477,000.00

Lem kayu
C

kg

0.500
16,000.00
JUMLAH HARGA BAHAN

8,000.00
485,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Overh
15% x D
Harga Satuan Pekerjaan (D+E) ead +
Profit
15%
A.4.6.1.5c Pembuatan dan pemasangan
1 m daun pintu panel, kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Kayu Kruing
Lem kayu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

771,250.00
115,687.50
886,937.50

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.000
50,000.00
3.000
70,000.00
0.300
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA

50,000.00
210,000.00
22,500.00
3,750.00
286,250.00

m3
kg

0.040
6,350,000.00
0.500
16,000.00
JUMLAH HARGA BAHAN

254,000.00
8,000.00
262,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
548,250.00
Overhead + Profit 15%
15% x D
82,237.50
Overh
ead
+
Harga Satuan Pekerjaan (D+E)
630,487.50
Profit
A.4.6.1.6. Pembuatan dan pemasangan15%
1 m pintu dan jendela kaca, kayu kelas I & II

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Papan kayu (Jati)
Lem kayu

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.800
50,000.00
2.400
70,000.00
0.240
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA

40,000.00
168,000.00
18,000.00
3,000.00
229,000.00

m3
kg

0.024 10,826,400.00
0.300
16,000.00
JUMLAH HARGA BAHAN

259,833.60
4,800.00
264,633.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

493,633.60
74,045.04
567,678.64

15% x D

A.4.6.1.6aPembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu jati (perum)

No

Uraian

Satua Koefisie
Kode
n
n

Harga

Jumlah

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan kayu (Jati)
Lem kayu

Satua Koefisie
n
n

Satuan
(Rp)

Harga
(Rp)

OH
OH
OH
OH

0.800
50,000.00
2.400
70,000.00
0.240
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA

40,000.00
168,000.00
18,000.00
3,000.00
229,000.00

m3
kg

0.024 10,826,400.00
0.300
16,000.00
JUMLAH HARGA BAHAN

259,833.60
4,800.00
264,633.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

493,633.60
74,045.04
567,678.64

15% x D

A.4.6.1.6bPembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Kayu Bengkirai
Lem kayu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.800
50,000.00
2.400
70,000.00
0.240
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA

40,000.00
168,000.00
18,000.00
3,000.00
229,000.00

m3
kg

0.024 11,925,000.00
0.300
16,000.00
JUMLAH HARGA BAHAN

286,200.00
4,800.00
291,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

520,000.00
78,000.00
598,000.00

15% x D

A.4.6.1.6cPembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Papan Kayu Kruing
Lem kayu
PERALATAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.800
50,000.00
2.400
70,000.00
0.240
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA

40,000.00
168,000.00
18,000.00
3,000.00
229,000.00

m3
kg

0.024
6,350,000.00
0.300
16,000.00
JUMLAH HARGA BAHAN

152,400.00
4,800.00
157,200.00

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

386,200.00
57,930.00
444,130.00

15% x D

A.4.6.1.13Pembuatan dan pemasangan 1 m Konstruksi Kuda-kuda konvensional, kayu kelas I , II, & III b

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok kayu (Kruing)
Besi strip tebal 5mm
Paku 12 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

4.000
50,000.00
12.000
70,000.00
1.200
75,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA

200,000.00
840,000.00
90,000.00
15,000.00
1,145,000.00

m3
Kg
kg

1.100
6,470,000.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN

7,117,000.00
123,000.00
117,600.00
7,357,600.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

8,502,600.00
1,275,390.00
9,777,990.00

15% x D

A.4.6.1.13Pembuatan dan pemasangan 1 m Konstruksi Kuda-kuda konvensional, kayu jati bentang 6 me

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok Kayu Jati (Perum)
Besi strip tebal 5mm
Paku 12 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

4.000
50,000.00
12.000
70,000.00
1.200
75,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA

200,000.00
840,000.00
90,000.00
15,000.00
1,145,000.00

m3
Kg
kg

1.100 10,540,400.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN

11,594,440.00
123,000.00
117,600.00
11,835,040.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

12,980,040.00
1,947,006.00
14,927,046.00

15% x D

A.4.6.1.13Pembuatan dan pemasangan 1 m Konstruksi Kuda-kuda konvensional, kayu bengkirai bentan

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan

Jumlah
Harga

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok Kayu Bengkirai
Besi strip tebal 5mm
Paku 12 cm

Satua Koefisie
n
n

(Rp)

(Rp)

OH
OH
OH
OH

4.000
50,000.00
12.000
70,000.00
1.200
75,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA

200,000.00
840,000.00
90,000.00
15,000.00
1,145,000.00

m3
Kg
kg

1.100 10,158,400.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN

11,174,240.00
123,000.00
117,600.00
11,414,840.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

12,559,840.00
1,883,976.00
14,443,816.00

15% x D

A.4.6.1.13Pembuatan dan pemasangan 1 m Konstruksi Kuda-kuda konvensional, kayu kruing bentang 6

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok Kayu Kruing
Besi strip tebal 5mm
Paku 12 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

4.000
50,000.00
12.000
70,000.00
1.200
75,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA

200,000.00
840,000.00
90,000.00
15,000.00
1,145,000.00

m3
Kg
kg

1.100
6,470,000.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN

7,117,000.00
123,000.00
117,600.00
7,357,600.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

8,502,600.00
1,275,390.00
9,777,990.00

15% x D

A.4.6.1.14Pemasangan 1 m Konstruksi Kuda-kuda ekspos Kayu jati

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu Jati
Besi strip tebal 5mm
Paku 12 cm

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

m3
Kg
kg

Harga
Satuan
(Rp)

6.700
50,000.00
20.100
70,000.00
2.010
75,000.00
0.335
75,000.00
JUMLAH TENAGA KERJA
1.200
15.000
5.600

10,540,400.00
8,200.00
21,000.00

Jumlah
Harga
(Rp)
335,000.00
1,407,000.00
150,750.00
25,125.00
1,917,875.00
12,648,480.00
123,000.00
117,600.00

JUMLAH HARGA BAHAN


C

12,889,080.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

14,806,955.00
2,221,043.25
17,027,998.25

15% x D

A.4.6.1.14Pemasangan 1 m Konstruksi Kuda-kuda ekspos Kayu Bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok Kayu Bengkirai
Besi strip tebal 5mm
Paku 12 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

6.700
50,000.00
20.100
70,000.00
2.010
75,000.00
0.335
75,000.00
JUMLAH TENAGA KERJA

335,000.00
1,407,000.00
150,750.00
25,125.00
1,917,875.00

m3
Kg
kg

1.200 10,158,400.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN

12,190,080.00
123,000.00
117,600.00
12,430,680.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

14,348,555.00
2,152,283.25
16,500,838.25

15% x D

A.4.6.1.14Pemasangan 1 m Konstruksi Kuda-kuda ekspos Kayu Kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu Kruing
Besi strip tebal 5mm
Paku 12 cm

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

6.700
50,000.00
20.100
70,000.00
2.010
75,000.00
0.335
75,000.00
JUMLAH TENAGA KERJA

335,000.00
1,407,000.00
150,750.00
25,125.00
1,917,875.00

m3
Kg
kg

1.200
6,470,000.00
15.000
8,200.00
5.600
21,000.00
JUMLAH HARGA BAHAN

7,764,000.00
123,000.00
117,600.00
8,004,600.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

A.4.6.1.15Pemasangan 1 m Konstruksi Nok, Gording, Murplat Kayu Jati

9,922,475.00
1,488,371.25
11,410,846.25

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok Kayu Jati
Besi strip tebal 5mm
Paku 12 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

2.400
50,000.00
7.200
70,000.00
0.720
75,000.00
0.120
75,000.00
JUMLAH TENAGA KERJA

120,000.00
504,000.00
54,000.00
9,000.00
687,000.00

m3
Kg
kg

1.100 10,540,400.00
15.000
8,200.00
3.000
21,000.00
JUMLAH HARGA BAHAN

11,594,440.00
123,000.00
63,000.00
11,780,440.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

12,467,440.00
1,870,116.00
14,337,556.00

15% x D

A.4.6.1.15Pemasangan 1 m Konstruksi Nok, Gording, Murplat Kayu Bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok Kayu Bengkirai
Besi strip tebal 5mm
Paku 12 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

2.400
50,000.00
7.200
70,000.00
0.720
75,000.00
0.120
75,000.00
JUMLAH TENAGA KERJA

120,000.00
504,000.00
54,000.00
9,000.00
687,000.00

m3
Kg
kg

1.100 10,158,400.00
15.000
8,200.00
3.000
21,000.00
JUMLAH HARGA BAHAN

11,174,240.00
123,000.00
63,000.00
11,360,240.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

12,047,240.00
1,807,086.00
13,854,326.00

15% x D

A.4.6.1.15Pemasangan 1 m Konstruksi Nok, Gording, Murplat Kayu Kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok Kayu Kruing

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

OH
OH
OH
OH

m3

Harga
Satuan
(Rp)

2.400
50,000.00
7.200
70,000.00
0.720
75,000.00
0.120
75,000.00
JUMLAH TENAGA KERJA
1.100

6,470,000.00

Jumlah
Harga
(Rp)
120,000.00
504,000.00
54,000.00
9,000.00
687,000.00
7,117,000.00

Besi strip tebal 5mm


Paku 12 cm
C

Kg
kg

15.000
8,200.00
3.000
21,000.00
JUMLAH HARGA BAHAN

123,000.00
63,000.00
7,303,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

7,990,000.00
1,198,500.00
9,188,500.00

15% x D

A.4.6.1.16 Pemasangan 1 m rangka atap genteng keramik, kayu kelas II

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 2 x 3 (Jati)
Paku 5 dan 10 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
7,250,000.00
0.036
6,095,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN

101,500.00
219,420.00
4,700.00
325,620.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

338,745.00
50,811.75
389,556.75

15% x D

A.4.6.1.16 Pemasangan 1 m rangka atap genteng keramik/morando, kayu bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 3 x 4 (Bengkir)
Paku 5 dan 10 cm

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
7,250,000.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN

101,500.00
46,163.70
4,700.00
152,363.70

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

165,488.70
24,823.31
190,312.01

A.4.6.1.16 Pemasangan 1 m rangka atap genteng keramik/morando, kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 cm (Kruing)
Reng 3 x 4 (Kruing)
Paku 5 dan 10 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
4,730,000.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN

66,220.00
46,163.70
4,700.00
117,083.70

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

130,208.70
19,531.31
149,740.01

15% x D

A.4.6.1.16 Pemasangan 1 m rangka atap genteng keramik/morando, kayu kempas

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 cm (Kempas)
Reng 3 x 4 (Kempas)
Paku 5 dan 10 cm

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
4,354,300.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN

60,960.20
46,163.70
4,700.00
111,823.90

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

124,948.90
18,742.34
143,691.24

15% x D

A.4.6.1.16 Pemasangan 1 m rangka atap genteng press, kayu bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Harga
Satuan
(Rp)

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
5,000.00
7,000.00
750.00
375.00
13,125.00

BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 2 x 3 (Bengkir)
Paku 5 dan 10 cm

m3
m3
kg

0.014
7,250,000.00
0.003
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN

101,500.00
23,081.85
4,700.00
129,281.85

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

142,406.85
21,361.03
163,767.88

15% x D

A.4.6.1.16 Pemasangan 1 m rangka atap genteng press, kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 cm (Kruing)
Reng 2 x 3 (Kruing)
Paku 5 dan 10 cm

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
4,730,000.00
0.003
4,470,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN

66,220.00
14,751.00
4,700.00
85,671.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

98,796.00
14,819.40
113,615.40

15% x D

A.4.6.1.16 Pemasangan 1 m rangka atap genteng press, kayu kempas

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Kaso-kaso 5 x 7 cm (Kempas)
Reng 2 x 3 (Kempas)
Paku 5 dan 10 cm

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
4,354,300.00
0.003
3,538,900.00
0.250
18,800.00
JUMLAH HARGA BAHAN

60,960.20
11,678.37
4,700.00
77,338.57

PERALATAN
JUMLAH HARGA ALAT

D
E

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%

15% x D

90,463.57
13,569.54

Harga Satuan Pekerjaan (D+E)

104,033.11

A.4.6.1.17 Pemasangan 1 m rangka atap genteng beton, kayu kelas II

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 2 x 3 (Jati)
Paku 5 dan 10 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
7,250,000.00
0.057
6,095,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN

101,500.00
347,415.00
4,700.00
453,615.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

466,740.00
70,011.00
536,751.00

15% x D

A.4.6.1.17 Pemasangan 1 m rangka atap genteng beton, kayu bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 cm (Bengkir)
Reng 3 x 4 (Bengkir)
Paku 5 dan 10 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
7,250,000.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN

101,500.00
46,163.70
4,700.00
152,363.70

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

165,488.70
24,823.31
190,312.01

15% x D

A.4.6.1.17 Pemasangan 1 m rangka atap genteng beton, kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang

Kode

L.01
L.02
L.03

Satua Koefisie
n
n
OH
OH
OH

0.100
0.100
0.010

Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00

Jumlah
Harga
(Rp)
5,000.00
7,000.00
750.00

Mandor
B

L.04

BAHAN
Kaso-kaso 5 x 7 cm (Kruing)
Reng 3 x 4 (Kruing)
Paku 5 dan 10 cm

OH

0.005
75,000.00
JUMLAH TENAGA KERJA

375.00
13,125.00

m3
m3
kg

0.014
4,730,000.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN

66,220.00
46,163.70
4,700.00
117,083.70

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

130,208.70
19,531.31
149,740.01

15% x D

A.4.6.1.17 Pemasangan 1 m rangka atap genteng beton, kayu kempas

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 cm (Kempas)
Reng 3 x 4 (Kempas)
Paku 5 dan 10 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

m3
m3
kg

0.014
4,354,300.00
0.007
6,994,500.00
0.250
18,800.00
JUMLAH HARGA BAHAN

60,960.20
46,163.70
4,700.00
111,823.90

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

124,948.90
18,742.34
143,691.24

15% x D

A.4.6.1.19 Pemasangan 1 m rangka langit-langit (50 x 100), kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Kaso-kaso 5 x 7 (kruing)
Paku 7 - 10 cm

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.150
50,000.00
0.300
70,000.00
0.030
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

7,500.00
21,000.00
2,250.00
5,625.00
36,375.00

m3
kg

0.015
4,730,000.00
0.200
18,800.00
JUMLAH HARGA BAHAN

72,842.00
3,760.00
76,602.00

PERALATAN
JUMLAH HARGA ALAT

Jumlah
Harga
(Rp)

Jumlah (A+B+C)

112,977.00

E
F

Overhead + Profit 15%


Harga Satuan Pekerjaan (D+E)

15% x D

16,946.55
129,923.55

A.4.6.1.19 Pemasangan 1 m rangka langit-langit (100 x 100), kayu kempas

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 (Kempas)
Paku 7 - 10 cm

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.150
50,000.00
0.300
70,000.00
0.030
75,000.00
0.075
75,000.00
JUMLAH TENAGA KERJA

7,500.00
21,000.00
2,250.00
5,625.00
36,375.00

m3
kg

0.015
4,354,300.00
0.200
18,800.00
JUMLAH HARGA BAHAN

67,056.22
3,760.00
70,816.22

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

107,191.22
16,078.68
123,269.90

15% x D

A.4.6.1.20 Pemasangan 1 m rangka langit-langit (60 x 60), kayu kelas II atau III

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 (kruing)
Paku 7 - 10 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.200
50,000.00
0.300
70,000.00
0.030
75,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA

10,000.00
21,000.00
2,250.00
750.00
34,000.00

m3
kg

0.016
4,730,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN

77,099.00
4,700.00
81,799.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

115,799.00
17,369.85
133,168.85

15% x D

A.4.6.1.20 Pemasangan 1 m rangka langit-langit (60 x 60), kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

0.200
0.300
0.030
0.010

Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
75,000.00

Jumlah
Harga
(Rp)
10,000.00
21,000.00
2,250.00
750.00

BAHAN
Kaso-kaso 5 x 7 (kruing)
Paku 7 - 10 cm

m3
kg

JUMLAH TENAGA KERJA

34,000.00

0.016
4,730,000.00
0.250
18,800.00
JUMLAH HARGA BAHAN

77,099.00
4,700.00
81,799.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

115,799.00
17,369.85
133,168.85

15% x D

A.4.6.1.20 Pemasangan 1 m rangka langit-langit (60 x 60), kayu kempas

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Kaso-kaso 5 x 7 (kempas)
Paku 7 - 10 cm

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.200
50,000.00
0.300
70,000.00
0.030
75,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA

10,000.00
21,000.00
2,250.00
750.00
34,000.00

m3
kg

0.016
4,354,300.00
0.250
18,800.00
JUMLAH HARGA BAHAN

70,975.09
4,700.00
75,675.09

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

109,675.09
16,451.26
126,126.35

15% x D

A.4.6.1.21Pemasangan 1 m' lisplank ukuran (3 x 20 ), kayu kelas I atau kelas II

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Papan Kayu (bengkir)
Paku 7 - 10 cm

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.200
70,000.00
0.020
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
14,000.00
1,500.00
375.00
20,875.00

m3
kg

0.011 12,133,400.00
0.100
18,800.00
JUMLAH HARGA BAHAN

131,040.72
1,880.00
132,920.72

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

153,795.72
23,069.36
176,865.08

A.4.6.1.21Pemasangan 1 m' lisplank ukuran (3 x 20 ), kayu bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Kayu (Bengkirai)
Paku 7 - 10 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.200
70,000.00
0.020
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
14,000.00
1,500.00
375.00
20,875.00

m3
kg

0.007 12,133,400.00
0.100
18,800.00
JUMLAH HARGA BAHAN

87,360.48
1,880.00
89,240.48

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

110,115.48
16,517.32
126,632.80

15% x D

A.4.6.1.21Pemasangan 1 m' lisplank ukuran (3 x 20 ), kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Papan Kayu (Kruing)
Paku 7 - 10 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.200
70,000.00
0.020
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
14,000.00
1,500.00
375.00
20,875.00

m3
kg

0.007
7,190,000.00
0.100
18,800.00
JUMLAH HARGA BAHAN

51,768.00
1,880.00
53,648.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

74,523.00
11,178.45
85,701.45

15% x D

A.4.6.1.23Pemasangan 1 m rangka dinding pemisah (60 x 120 ) cm, kayu kelas II atau III

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok kayu (kruing)

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

OH
OH
OH
OH

m3

Harga
Satuan
(Rp)

0.150
50,000.00
0.450
70,000.00
0.045
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
0.028

6,350,000.00

Jumlah
Harga
(Rp)
7,500.00
31,500.00
3,375.00
600.00
42,975.00
177,800.00

paku 5 dan 7 cm
C

Kg

0.150
18,800.00
JUMLAH HARGA BAHAN

2,820.00
180,620.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

223,595.00
33,539.25
257,134.25

15% x D

A.4.6.1.23Pemasangan 1 m rangka dinding pemisah (60 x 120 ) cm, kayu bengkirai

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Balok kayu (Bengkir)
paku 5 dan 7 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.150
50,000.00
0.450
70,000.00
0.045
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

7,500.00
31,500.00
3,375.00
600.00
42,975.00

m3
Kg

0.028 #
#VALUE!
0.150
18,800.00
2,820.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.6.1.23Pemasangan 1 m rangka dinding pemisah (60 x 120 ) cm, kayu kruing

No
A

Uraian
TENAGA
Pekerja
Tukang kayu
Kepala Tukang
Mandor
BAHAN
Balok kayu (Kruing)
paku 5 dan 7 cm

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.150
50,000.00
0.450
70,000.00
0.045
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

7,500.00
31,500.00
3,375.00
600.00
42,975.00

m3
Kg

0.028 #
#VALUE!
0.150
18,800.00
2,820.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

PEKERJAAN BESI & ALUMUNIUM


A.4.2.1.1. Pemasangan 1 kg besi profil

15% x D

#VALUE!
#VALUE!
#VALUE!

No
A

Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Besi Profil

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

3,000.00
4,200.00
450.00
225.00
7,875.00

Kg

1.150
9,850.00
JUMLAH HARGA BAHAN

11,327.50
11,327.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

19,202.50
2,880.38
22,082.88

15% x D

A.4.2.1.1aPemasangan 1 kg besi profil

No
A

Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Besi Profil
Menie Besi

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

3,000.00
4,200.00
450.00
225.00
7,875.00

Kg
Kg

1.150
9,850.00
0.060
24,100.00
JUMLAH HARGA BAHAN

11,327.50
1,446.00
12,773.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

20,648.50
3,097.28
23,745.78

15% x D

A.4.2.1.1bPemasangan 1 kg besi kanal CNP

No
A

Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor
BAHAN
Besi Kanal CNP
Menie Besi

Kode

L.01
L.03
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

3,000.00
4,200.00
450.00
225.00
7,875.00

Kg
Kg

1.150
10,000.00
0.060
24,100.00
JUMLAH HARGA BAHAN

11,500.00
1,446.00
12,946.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

20,821.00
3,123.15
23,944.15

15% x D

A.4.2.1.2. Pemasangan 1 Kg rangka kuda-kuda baja IWF

No
A

Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.03
L.03
L.04

BAHAN
Besi Baja IWF

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

3,000.00
4,200.00
450.00
225.00
7,875.00

Kg

1.150
11,500.00
JUMLAH HARGA BAHAN

13,225.00
13,225.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

21,100.00
3,165.00
24,265.00

15% x D

A.4.2.1.2aPemasangan 1 Kg rangka kuda-kuda baja IWF

No
A

Uraian
TENAGA
Pekerja
Tukang Las Konstruksi
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Besi Baja IWF
Menie Besi

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.060
50,000.00
0.060
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

3,000.00
4,200.00
450.00
225.00
7,875.00

Kg
Kg

1.150
11,500.00
0.060
24,100.00
JUMLAH HARGA BAHAN

13,225.00
1,446.00
14,671.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

22,546.00
3,381.90
25,927.90

15% x D

A.4.2.1.3. Pengerjaan 100 Kg pekerjaan perakitan

No
A

Uraian
TENAGA

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
B

D
E
F

L.01
L.03
L.03
L.04

BAHAN
Solar
Minyak Pelumas
PERALATAN
Sewa Alat (Welding Machine)

E63

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.001
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
75.00
375.00
12,450.00

Liter
Liter

1.000
9,200.00
0.100
30,000.00
JUMLAH HARGA BAHAN

9,200.00
3,000.00
12,200.00

Jam

0.800
24,924.29
JUMLAH HARGA ALAT

19,939.43
19,939.43

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

44,589.43
6,688.41
51,277.84

15% x D

A.4.2.1.3aPengerjaan 1 Kg pekerjaan perakitan

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Solar
Minyak Pelumas
PERALATAN
Sewa Alat (Welding Machine)

E63

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.001
50,000.00
0.001
70,000.00
0.00001
75,000.00
0.00005
75,000.00
JUMLAH TENAGA KERJA

50.00
70.00
0.75
3.75
124.50

Liter
Liter

0.010
9,200.00
0.001
30,000.00
JUMLAH HARGA BAHAN

92.00
30.00
122.00

Jam

0.008
24,924.29
JUMLAH HARGA ALAT

199.39
199.39

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

445.89
66.88
512.78

15% x D

A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

No
A

Uraian
TENAGA
Pekerja
Tukang Las Biasa
Kepala Tukang
Mandor
BAHAN
Besi siku L 30.30.3
Besi plat baja
Kawat las

Satua Koefisie
Kode
n
n
L.01
L.03
L.03
L.04

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.050
50,000.00
1.050
70,000.00
0.105
75,000.00
0.052
75,000.00
JUMLAH TENAGA KERJA

52,500.00
73,500.00
7,875.00
3,900.00
137,775.00

Kg
Kg
Kg

15.000
9,850.00
147,750.00
32.800 #
#VALUE!
0.050
30,000.00
1,500.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Kawat las listrik
Solar
Minyak Pelumas
PERALATAN
Sewa Alat (Welding Machine)

E63

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.040
50,000.00
0.020
70,000.00
0.002
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

2,000.00
1,400.00
150.00
150.00
3,700.00

Kg
Liter
Liter

0.400
30,000.00
0.300
9,200.00
0.040
30,000.00
JUMLAH HARGA BAHAN

12,000.00
2,760.00
1,200.00
15,960.00

Jam

0.170
24,924.29
JUMLAH HARGA ALAT

4,237.13
4,237.13

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

23,897.13
3,584.57
27,481.70

15% x D

A.4.2.1.5aPengerjaan 1 cm pengelasan dengan las listrik

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.03
L.03
L.04

BAHAN
Kawat las listrik
Solar
Minyak Pelumas
PERALATAN
Sewa Alat (Welding Machine)

E63

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.004
50,000.00
0.002
70,000.00
0.0002
75,000.00
0.0002
75,000.00
JUMLAH TENAGA KERJA

200.00
140.00
15.00
15.00
370.00

Kg
Liter
Liter

0.040
30,000.00
0.030
9,200.00
0.004
30,000.00
JUMLAH HARGA BAHAN

1,200.00
276.00
120.00
1,596.00

Jam

0.017
24,924.29
JUMLAH HARGA ALAT

423.71
423.71

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

2,389.71
358.46
2,748.17

15% x D

A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi

No
A

Uraian
TENAGA

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

Pekerja
Tukang Las Biasa
Kepala Tukang
Mandor
B

L.01
L.03
L.03
L.04

BAHAN
Pintu gulung besi

OH
OH
OH
OH

1.200
50,000.00
1.200
70,000.00
0.120
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA

m2

1.000 #
JUMLAH HARGA BAHAN

60,000.00
84,000.00
9,000.00
450.00
153,450.00
#VALUE!
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC

No
A

Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Pintu lipat

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.440
50,000.00
0.440
70,000.00
0.044
75,000.00
0.022
75,000.00
JUMLAH TENAGA KERJA

m2

1.000 #
JUMLAH HARGA BAHAN

Jumlah
Harga
(Rp)
22,000.00
30,800.00
3,300.00
1,650.00
57,750.00
#VALUE!
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.2.1.10Pemasangan 1 m2 rolling door alumunium

No
A

Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor
BAHAN
Rolling door alumunium

Kode

L.01
L.03
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

1.000
50,000.00
1.000
70,000.00
0.100
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA

50,000.00
70,000.00
7,500.00
3,750.00
131,250.00

m2

1.000
250,000.00
JUMLAH HARGA BAHAN

250,000.00
250,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

381,250.00
57,187.50
438,437.50

A.4.2.1.11Pemasangan 1 m kusen pintu alumunium

No
A

Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Profil alumunium
Skrup fixer
Sealant

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.043
50,000.00
0.043
70,000.00
0.004
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

2,150.00
3,010.00
322.50
157.50
5,640.00

m
bh
tube

1.100
98,500.00
2.000
1,550.00
0.060
13,500.00
JUMLAH HARGA BAHAN

108,350.00
3,100.00
810.00
112,260.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

117,900.00
17,685.00
135,585.00

15% x D

A.4.2.1.11Pemasangan 1 m kusen pintu alumunium ukuran 4 inch (silver)

No
A

Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Profil alumunium 4" Silver
Skrup fixer
Sealant

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.043
50,000.00
0.043
70,000.00
0.004
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

2,150.00
3,010.00
322.50
157.50
5,640.00

m
bh
tube

1.100
98,500.00
2.000
1,550.00
0.060
13,500.00
JUMLAH HARGA BAHAN

108,350.00
3,100.00
810.00
112,260.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

117,900.00
17,685.00
135,585.00

15% x D

A.4.2.1.11Pemasangan 1 m kusen pintu alumunium ukuran 4 inch (brown)

No
A

Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

0.043
0.043
0.004
0.002

Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
75,000.00

Jumlah
Harga
(Rp)
2,150.00
3,010.00
322.50
157.50

JUMLAH TENAGA KERJA


B

BAHAN
Profil alumunium 4" Brown
Skrup fixer
Sealant

m
bh
tube

5,640.00

1.100 #
#VALUE!
2.000
1,550.00
3,100.00
0.060
13,500.00
810.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.2.1.12Pemasangan 1 m2 pintu alumunium strip lebar 8 cm

No
A

Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Profil alumunium 4"
Alumunium strip

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.085
50,000.00
0.085
70,000.00
0.009
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

4,250.00
5,950.00
637.50
315.00
11,152.50

m
m

4.400
98,500.00
433,400.00
14.600 #
#VALUE!
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.2.1.13Pemasangan 1 m2 pintu kaca rangka alumunium

No
A

Uraian
TENAGA
Pekerja
Tukang Khusus Alumunium
Kepala Tukang
Mandor
BAHAN
Pintu alumunium
Profil Kaca
Sealant

Kode

L.01
L.03
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

m
m
tube

Harga
Satuan
(Rp)

0.085
50,000.00
0.085
70,000.00
0.009
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
4,250.00
5,950.00
637.50
337.50
11,175.00

4.400 #
#VALUE!
4.500
3,000.00
13,500.00
0.270
13,500.00
3,645.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E

Jumlah (A+B+C)
Overhead + Profit 15%

15% x D

#VALUE!
#VALUE!

Harga Satuan Pekerjaan (D+E)

#VALUE!

A.4.2.1.18Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm

No
A

Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Klas II atau III

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.200
50,000.00
0.200
70,000.00
0.020
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

10,000.00
14,000.00
1,500.00
75.00
25,575.00

Lbr
Kg
m3

1.050
43,750.00
0.015
18,800.00
0.019
6,350,000.00
JUMLAH HARGA BAHAN

45,937.50
282.00
120,650.00
166,869.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

192,444.50
28,866.68
221,311.18

15% x D

A.4.2.1.18Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm (papan kruing)

No
A

Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor

Kode

L.01
L.03
L.03
L.04

BAHAN
Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Kruing

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.200
50,000.00
0.200
70,000.00
0.020
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

10,000.00
14,000.00
1,500.00
75.00
25,575.00

Lbr
Kg
m3

1.050
43,750.00
0.015
18,800.00
0.019
6,350,000.00
JUMLAH HARGA BAHAN

45,937.50
282.00
120,650.00
166,869.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

192,444.50
28,866.68
221,311.18

15% x D

A.4.2.1.18Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm (papan kempas)

No
A

Uraian
TENAGA
Pekerja
Tukang
Kepala Tukang

Kode

L.01
L.03
L.03

Satua Koefisie
n
n
OH
OH
OH

0.200
0.200
0.020

Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00

Jumlah
Harga
(Rp)
10,000.00
14,000.00
1,500.00

Mandor
B

L.04

BAHAN
Seng Plaat
Paku Biasa 1 - 2,5 cm
Kayu Papan Kempas

OH

0.001
75,000.00
JUMLAH TENAGA KERJA

75.00
25,575.00

Lbr
Kg
m3

1.050
43,750.00
0.015
18,800.00
0.019
5,750,000.00
JUMLAH HARGA BAHAN

45,937.50
282.00
109,250.00
155,469.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

181,044.50
27,156.68
208,201.18

15% x D

A.4.2.1.20Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120 cm, dinding partisi

No
A

Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Rangka metal hollow 40.40.2
mm
Assesoris (perkuatan, las dll)

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.250
50,000.00
0.250
70,000.00
0.025
75,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA

12,500.00
17,500.00
1,875.00
975.00
32,850.00

m1
Ls

3.500
9,650.00
100% x
33,775.00
rangka
JUMLAH
HARGA BAHAN

33,775.00
33,775.00
67,550.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

100,400.00
15,060.00
115,460.00

15% x D

A.4.2.1.21Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x60 cm, plafon

No
A

Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Rangka metal hollow 40.40.2
mm
Assesoris (perkuatan, las dll)

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.350
50,000.00
0.350
70,000.00
0.035
75,000.00
0.018
75,000.00
JUMLAH TENAGA KERJA

17,500.00
24,500.00
2,625.00
1,350.00
45,975.00

m1
Ls

4.000
9,650.00
100% x
38,600.00
rangka
JUMLAH
HARGA BAHAN

38,600.00
38,600.00
77,200.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

123,175.00
18,476.25
141,651.25

PEKERJAAN PLAFOND
.3

Pemasangan 1 m2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Asbes Semen
Paku Tripleks

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.030
50,000.00
0.070
70,000.00
0.007
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

1,500.00
4,900.00
525.00
300.00
7,225.00

Lbr
Kg

1.100
18,500.00
0.010
20,000.00
JUMLAH HARGA BAHAN

20,350.00
200.00
20,550.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

27,775.00
4,166.25
31,941.25

15% x D

A.4.5.1.1aPemasangan 1 m2 Langit-langit Saflex (1,00x1,00) m, tebal 5 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Saflex tebal 5 mm
Paku Tripleks

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.030
50,000.00
0.070
70,000.00
0.007
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

1,500.00
4,900.00
525.00
300.00
7,225.00

Lbr
Kg

1.100
15,300.00
0.010
20,000.00
JUMLAH HARGA BAHAN

16,830.00
200.00
17,030.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

24,255.00
3,638.25
27,893.25

15% x D

A.4.5.1.4. Pemasangan 1 m2 Langit-langit Akustik Ukuran (60x120) cm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Harga
Satuan
(Rp)

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
5,000.00
7,000.00
750.00
375.00
13,125.00

BAHAN
Akustik
Paku Tripleks

Lbr
Kg

1.500
146,080.00
0.050
20,000.00
JUMLAH HARGA BAHAN

219,120.00
1,000.00
220,120.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

233,245.00
34,986.75
268,231.75

15% x D

A.4.5.1.5 Memasang 1 m2 Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Tripleks
Paku Tripleks

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
7,000.00
750.00
375.00
13,125.00

Lbr
Kg

0.375
84,700.00
0.030
20,000.00
JUMLAH HARGA BAHAN

31,762.50
600.00
32,362.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

45,487.50
6,823.13
52,310.63

15% x D

A.4.5.1.6 Memasang 1 m2 Langit-langit Lambriziring Kayu Jati, tebal 6 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Papan
Paku Tripleks

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.800
50,000.00
0.800
70,000.00
0.080
75,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA

40,000.00
56,000.00
6,000.00
3,000.00
105,000.00

m3
Kg

0.015 10,826,400.00
0.010
20,000.00
JUMLAH HARGA BAHAN

162,396.00
200.00
162,596.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

A.4.5.1.7 Memasang 1 m2 Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm

267,596.00
40,139.40
307,735.40

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Gypsum Board
Paku Sekrup

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
0.050
70,000.00
0.005
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

5,000.00
3,500.00
375.00
375.00
9,250.00

Lbr
Kg

0.364
57,900.00
0.110
19,000.00
JUMLAH HARGA BAHAN

21,075.60
2,090.00
23,165.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

32,415.60
4,862.34
37,277.94

15% x D

A.4.5.1.8 Memasang 1 m2 Langit-langit Akustik Uk (60x120) cm berikut Rangka Allumunium

No
A

Uraian
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Profil Allumunium "T"
Kawat 4 mm
Ramset
Akustik 60 x 120 cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.500
50,000.00
0.500
70,000.00
0.050
75,000.00
0.025
75,000.00
JUMLAH TENAGA KERJA

25,000.00
35,000.00
3,750.00
1,875.00
65,625.00

m'
kg
bh
Lbr

3.600
18,000.00
0.150
21,700.00
1.050
7,920.00
1.500
146,080.00
JUMLAH HARGA BAHAN

64,800.00
3,255.00
8,316.00
219,120.00
295,491.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

361,116.00
54,167.40
415,283.40

15% x D

A.4.5.1.9 Pemasangan 1 m' List Langit-Langit Kayu Profil

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Harga
Satuan
(Rp)

0.050
50,000.00
0.050
70,000.00
0.005
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
2,500.00
3,500.00
375.00
225.00
6,600.00

List Kayu Profil


Paku
C

m1
Kg

1.050
4,600.00
0.010
20,000.00
JUMLAH HARGA BAHAN

4,830.00
200.00
5,030.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

11,630.00
1,744.50
13,374.50

15% x D

PEKERJAAN ATAP
A.4.5.2.1 Pemasangan Atap 1 m2 Genteng Plentong Kecil

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Genteng Plentong

OH
OH
OH
OH

Buah

Harga
Satuan
(Rp)

0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
25.000

2,150.00

JUMLAH HARGA BAHAN


C

Jumlah
Harga
(Rp)
7,500.00
5,250.00
562.50
600.00
13,912.50
53,750.00
53,750.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

67,662.50
10,149.38
77,811.88

15% x D

A.4.5.2.1aPemasangan Atap 1 m2 Genteng Press Jatiwangi

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Press Jatiwangi

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Buah

Harga
Satuan
(Rp)

0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
25.000

2,400.00

JUMLAH HARGA BAHAN


C

7,500.00
5,250.00
562.50
600.00
13,912.50
60,000.00
60,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

73,912.50
11,086.88
84,999.38

A.4.5.2.1bPemasangan Atap 1 m2 Genteng Press Kebumen

No
A

Uraian

Kode

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Genteng Press Kebumen

Satua Koefisie
n
n
OH
OH
OH
OH

Buah

Harga
Satuan
(Rp)

0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
25.000

2,650.00

JUMLAH HARGA BAHAN


C

Jumlah
Harga
(Rp)
7,500.00
5,250.00
562.50
600.00
13,912.50
66,250.00
66,250.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

80,162.50
12,024.38
92,186.88

15% x D

A.4.5.2.2 Pemasangan 1 m2 Atap Genteng Kodok Glasur

No
A

Uraian

Kode

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Genteng Kodok Glasur

Satua Koefisie
n
n
OH
OH
OH
OH

Buah

Harga
Satuan
(Rp)

0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
25.000

3,350.00

JUMLAH HARGA BAHAN


C

Jumlah
Harga
(Rp)
7,500.00
5,250.00
600.00
600.00
13,950.00
83,750.00
83,750.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

97,700.00
14,655.00
112,355.00

15% x D

A.4.5.2.3 Pemasangan 1 m2 Atap Genteng Plentong Super / Besar

No
A

Satua Koefisie
Kode
n
n

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng
Besar

Plentong

L.01
L.02
L.03
L.04

Super

OH
OH
OH
OH

Buah

Harga
Satuan
(Rp)

0.150
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
12.000

3,300.00

Jumlah
Harga
(Rp)
7,500.00
5,250.00
600.00
600.00
13,950.00
39,600.00

JUMLAH HARGA BAHAN


C

39,600.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

53,550.00
8,032.50
61,582.50

15% x D

A.4.5.2.4 Pemasangan 1 m' Genteng Bubung Plentong

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Genteng Bubung Plentong
Portland Semen
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

20,000.00
14,000.00
1,500.00
150.00
35,650.00

Buah
Kg
m3

5.000
4,000.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN

20,000.00
12,000.00
5,065.60
37,065.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

72,715.60
10,907.34
83,622.94

15% x D

Harga
Satuan
A.4.5.2.4aPemasangan 1 m' Genteng Bubung Press Jatiwangi Pekerjaan (D+E)

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Genteng Bubung Jatiwangi
Portland Semen
Pasir Pasang

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

20,000.00
14,000.00
1,500.00
150.00
35,650.00

Buah
Kg
m3

5.000
4,860.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN

24,300.00
12,000.00
5,065.60
41,365.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

A.4.5.2.4bPemasangan 1 m' Genteng Bubung Press Kebumen

77,015.60
11,552.34
88,567.94

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Genteng Bubung Kebumen
Portland Semen
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

20,000.00
14,000.00
1,500.00
150.00
35,650.00

Buah
Kg
m3

5.000
4,850.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN

24,250.00
12,000.00
5,065.60
41,315.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

76,965.60
11,544.84
88,510.44

15% x D

A.4.5.2.5 Pemasangan 1 m' Genteng Bubung Kodok Glasur

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Genteng Bubung Kodok Glasur
Portland Semen
Pasir Pasang

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

20,000.00
14,000.00
1,500.00
150.00
35,650.00

Buah
Kg
m3

5.000
4,500.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN

22,500.00
12,000.00
5,065.60
39,565.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

75,215.60
11,282.34
86,497.94

15% x D

A.4.5.2.6 Pemasangan 1 m' Genteng Bubung Plentong Besar

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Harga
Satuan
(Rp)

0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
20,000.00
14,000.00
1,500.00
150.00
35,650.00

Genteng
Bubung
Besar
Portland Semen
Pasir Pasang
C

Plentong

Buah
Kg
m3

4.000
4,700.00
8.000
1,500.00
0.032
158,300.00
JUMLAH HARGA BAHAN

18,800.00
12,000.00
5,065.60
35,865.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

71,515.60
10,727.34
82,242.94

15% x D

A.4.5.2.8 Pemasangan 1 m2 Atap Asbes Gelombang (2,50x0,92 m) x 5 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Asbes Gelombang 92 x 250
Paku Pancing 60 x 230

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.140
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

7,000.00
5,250.00
600.00
600.00
13,450.00

Lbr
Kg

0.500
92,166.67
0.120
41,200.00
JUMLAH HARGA BAHAN

46,083.33
4,944.00
51,027.33

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

64,477.33
9,671.60
74,148.93

15% x D

A.4.5.2.9 Pemasangan 1 m2 Atap Asbes Gelombang (2,25x0,92 m) x 5 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang 92 x 225
Paku Pancing 60 x 230

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.140
50,000.00
0.075
70,000.00
0.008
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

7,000.00
5,250.00
600.00
600.00
13,450.00

Lbr
Kg

0.600
83,083.33
0.120
41,200.00
JUMLAH HARGA BAHAN

49,850.00
4,944.00
54,794.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

A.4.5.2.10Pemasangan 1 m2 Atap Asbes Gelombang (2,00x0,92 m) x 5 mm

68,244.00
10,236.60
78,480.60

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Asbes Gelombang 92 x 200
Paku Pancing 60 x 230

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.140
50,000.00
0.070
70,000.00
0.007
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA

7,000.00
4,900.00
525.00
525.00
12,950.00

Lbr
Kg

0.600
71,875.00
0.120
41,200.00
JUMLAH HARGA BAHAN

43,125.00
4,944.00
48,069.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

61,019.00
9,152.85
70,171.85

15% x D

A.4.5.2.11Pemasangan 1 m2 Atap Asbes Gelombang (1,80x0,92 m) x 5 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Asbes Gelombang 92 x 180
Paku Pancing 60 x 230

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.140
50,000.00
0.070
70,000.00
0.007
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA

7,000.00
4,900.00
525.00
525.00
12,950.00

Lbr
Kg

0.750
58,583.33
0.120
41,200.00
JUMLAH HARGA BAHAN

43,937.50
4,944.00
48,881.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

61,831.50
9,274.73
71,106.23

15% x D

A.4.5.2.12Pemasangan 1 m2 Atap Asbes Gelombang (3,00x1,05 m) x 4 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Asbes Gelombang 105 x 300
Paku Pancing 60 x 230

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Lbr
Kg

Harga
Satuan
(Rp)

0.140
50,000.00
0.070
70,000.00
0.007
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA
0.350
0.120

77,700.00
41,200.00

Jumlah
Harga
(Rp)
7,000.00
4,900.00
525.00
525.00
12,950.00
27,195.00
4,944.00

JUMLAH HARGA BAHAN


C

32,139.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

45,089.00
6,763.35
51,852.35

15% x D

A.4.5.2.14Pemasangan 1 m2 Atap Asbes Gelombang (2,40x1,05 m) x 4 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Asbes Gelombang 105 x 240
Paku Pancing 60 x 230

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.140
50,000.00
0.070
70,000.00
0.007
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA

7,000.00
4,900.00
525.00
525.00
12,950.00

Lbr
Kg

0.440
43,200.00
0.120
41,200.00
JUMLAH HARGA BAHAN

19,008.00
4,944.00
23,952.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

36,902.00
5,535.30
42,437.30

15% x D

A.4.5.2.30Pemasangan 1 m2 Atap Genteng Beton

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Genteng Beton
Paku Biasa 2" - 5"

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.200
50,000.00
0.100
70,000.00
0.010
75,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA

10,000.00
7,000.00
750.00
750.00
18,500.00

bh
Kg

11.000
4,350.00
0.030
18,800.00
JUMLAH HARGA BAHAN

47,850.00
564.00
48,414.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

66,914.00
10,037.10
76,951.10

15% x D

A.4.5.2.32Pemasangan 1 m2 Atap Genteng Metal

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan

Jumlah
Harga

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Genteng Metal
Paku Biasa " - 1"

Satua Koefisie
n
n

(Rp)

(Rp)

OH
OH
OH
OH

0.200
50,000.00
0.100
70,000.00
0.010
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

10,000.00
7,000.00
750.00
75.00
17,825.00

bh
Kg

1.020
48,000.00
0.200
18,800.00
JUMLAH HARGA BAHAN

48,960.00
3,760.00
52,720.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

70,545.00
10,581.75
81,126.75

15% x D

A.4.5.2.33Pemasangan 1 m2 Atap Sirap Kayu

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Genteng Sirap Kayu
Paku Biasa 1/2" - 1"

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.166
50,000.00
0.250
70,000.00
0.025
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

8,300.00
17,500.00
1,875.00
600.00
28,275.00

Lbr
Kg

30.000
1,400.00
0.200
18,800.00
JUMLAH HARGA BAHAN

42,000.00
3,760.00
45,760.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

74,035.00
11,105.25
85,140.25

15% x D

A.4.5.2.34Pemasangan 1 m' Nok Genteng Beton

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Nok Genteng Beton
Paku Biasa 2" - 5"
Portland Semen
Pasir Pasang
Semen Warna

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

Buah
Kg
Kg
m3
Kg

Harga
Satuan
(Rp)

0.400
50,000.00
0.200
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
3.500
0.050
10.800
0.032
1.000

5,500.00
18,800.00
1,500.00
158,300.00
2,300.00

Jumlah
Harga
(Rp)
20,000.00
14,000.00
1,500.00
1,500.00
37,000.00
19,250.00
940.00
16,200.00
5,065.60
2,300.00

JUMLAH HARGA BAHAN


C

43,755.60

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

80,755.60
12,113.34
92,868.94

15% x D

A.4.5.2.36Pemasangan 1 m' Nok Genteng Metal

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Nok Genteng Metal
Paku Biasa 1/2" - 1"

Satua Koefisie
n
n
OH
OH
OH
OH

Buah
Kg

Harga
Satuan
(Rp)

0.250
50,000.00
0.150
70,000.00
0.015
75,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
12,500.00
10,500.00
1,125.00
975.00
25,100.00

1.100 #
#VALUE!
0.050
18,800.00
JUMLAH HARGA BAHAN
#VALUE!

940.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.5.2.37Pemasangan 1 m' Nok Sirap

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Seng Plaat (90 x 180 cm) BJLS
28
Paku Biasa 1/2" - 1"
Paku Biasa 2" - 5"

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.125
50,000.00
0.250
70,000.00
0.025
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA

6,250.00
17,500.00
1,875.00
450.00
26,075.00

Lbr
Kg
Kg

0.400
0.050
0.050
JUMLAH HARGA

17,500.00
1,000.00
940.00
19,440.00

43,750.00
20,000.00
18,800.00
BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

45,515.00
6,827.25
52,342.25

15% x D

A.4.5.2.38Pemasangan 1 m2 Atap Seng Gelombang

No

Uraian

Satua Koefisie
Kode
n
n

Harga

Jumlah

No
A

Uraian

Kode

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Satua Koefisie
n
n

L.01
L.02
L.03
L.04

BAHAN
Seng Gelombang (90 x 180
cm)
281/2" - 1"
PakuBJLS
Biasa

Satuan
(Rp)

Harga
(Rp)

OH
OH
OH
OH

0.120
50,000.00
0.060
70,000.00
0.006
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA

6,000.00
4,200.00
450.00
450.00
11,100.00

Lbr
Kg

0.700
43,750.00
0.020
18,800.00
JUMLAH HARGA BAHAN

30,625.00
376.00
31,001.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

42,101.00
6,315.15
48,416.15

15% x D

A.4.5.2.39Pemasangan 1 m' Nok Seng

No
A

Uraian

Kode

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Satua Koefisie
n
n

L.01
L.02
L.03
L.04

BAHAN
Seng Plaat (90 x 180 cm) BJLS
28
Paku Biasa 1/2" - 1"

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.150
50,000.00
0.070
70,000.00
0.007
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA

7,500.00
4,900.00
525.00
450.00
13,375.00

Lbr
Kg

0.300
43,750.00
0.040
18,800.00
JUMLAH HARGA BAHAN

13,125.00
752.00
13,877.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

27,252.00
4,087.80
31,339.80

15% x D

A.4.5.2.40Pemasangan 1 m2 Atap Alumunium

No
A

Uraian

Kode

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Alumunium Gelombang
0,55
Paku Hak Panj 15 Cm
PERALATAN

L.01
L.02
L.03
L.04

Tbl

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.150
50,000.00
0.750
70,000.00
0.080
75,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA

7,500.00
52,500.00
6,000.00
450.00
66,450.00

Lbr
Kg

1.050 #
#VALUE!
0.020
22,600.00
JUMLAH HARGA BAHAN
#VALUE!

452.00

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.5.2.41Pemasangan 1 m' Nok Alumunium

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Nok Standar 40 x 18
Paku Hak Panj 15 Cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.100
50,000.00
1.000
70,000.00
0.100
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA

5,000.00
70,000.00
7,500.00
3,750.00
86,250.00

bh
Kg

1.200 #
#VALUE!
0.040
22,600.00
JUMLAH HARGA BAHAN
#VALUE!

904.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.5.2.42Pemasangan 1 m2 Alumunium Foil/sisalation

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Alumunium Foil

Satua Koefisie
n
n
OH
OH
OH
OH

m2

Harga
Satuan
(Rp)

0.150
50,000.00
0.050
70,000.00
0.005
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA
1.050 #

7,500.00
3,500.00
375.00
600.00
11,975.00
#VALUE!

JUMLAH HARGA BAHAN


C

Jumlah
Harga
(Rp)

#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

PEKERJAAN PENGECATAN
A.4.7.1.1. Pengikisan/pengerokan 1 m2 permukaan cat lama

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan

Jumlah
Harga

No
A

Uraian
TENAGA
Pekerja
Mandor

Kode

L.01
L.04

BAHAN
Soda api

Satua Koefisie
n
n

(Rp)

(Rp)

OH
OH

0.150
50,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

7,500.00
225.00
7,725.00

Kg

0.050
16,000.00
JUMLAH HARGA BAHAN

800.00
800.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

8,525.00
1,278.75
9,803.75

15% x D

A.4.7.1.3. Pengerokan 1 m2 karat pada permukaan baja cara manual

No
A

Uraian
TENAGA
Pekerja
Mandor

Kode

L.01
L.04

BAHAN
Sabun

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH

0.150
50,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

7,500.00
600.00
8,100.00

Kg

0.050
9,500.00
JUMLAH HARGA BAHAN

475.00
475.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

8,575.00
1,286.25
9,861.25

15% x D

A.4.7.1.4. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No
A

Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Cat menie
Plamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.070
50,000.00
0.009
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

Kg
Kg
Kg
Kg
Bh
Kg
Lbr

0.200
0.150
0.170
0.260
0.010
0.030
0.200
JUMLAH HARGA

22,600.00
20,000.00
50,700.00
50,700.00
8,900.00
19,100.00
4,400.00
BAHAN

Jumlah
Harga
(Rp)
3,500.00
630.00
450.00
225.00
4,805.00
4,520.00
3,000.00
8,619.00
13,182.00
89.00
573.00
880.00
30,863.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

35,668.00
5,350.20
41,018.20

15% x D

A.4.7.1.4aPengecatan 1 m2 bidang kayu lama (1 lapis cat dasar, 1 lapis cat penutup)

No
A

Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.070
50,000.00
0.075
70,000.00
0.008
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

Kg
Kg
Bh
Kg
Lbr

0.170
0.170
0.010
0.030
0.200
JUMLAH HARGA

50,700.00
50,700.00
8,900.00
19,100.00
4,400.00
BAHAN

Jumlah
Harga
(Rp)
3,500.00
5,250.00
562.50
187.50
9,500.00
8,619.00
8,619.00
89.00
573.00
880.00
18,780.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

28,280.00
4,242.00
32,522.00

15% x D

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur

No
A

Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Politur
Politur jadi
Ampelas

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.040
50,000.00
0.060
70,000.00
0.016
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

2,000.00
4,200.00
1,200.00
225.00
7,625.00

Lt
Lt
Lbr

0.150
42,000.00
0.372
45,600.00
2.000
4,400.00
JUMLAH HARGA BAHAN

6,300.00
16,963.20
8,800.00
32,063.20

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Overh
15% x D
ead
+
Harga Satuan Pekerjaan (D+E)
Profit
A.4.7.1.9. Pelaburan 1 m2 bidang kayu 15%
dengan vernis

No

Uraian

Kode

Satua Koefisie
n
n

39,688.20
5,953.23
45,641.43

Harga
Satuan

Jumlah
Harga

No
A

Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Vernis
Dempul
Ampelas

Satua Koefisie
n
n

(Rp)

(Rp)

OH
OH
OH
OH

0.160
50,000.00
0.160
70,000.00
0.016
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

8,000.00
11,200.00
1,200.00
225.00
20,625.00

Lt
Kg
Lbr

0.150
28,800.00
0.050
35,000.00
0.100
4,400.00
JUMLAH HARGA BAHAN

4,320.00
1,750.00
440.00
6,510.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

27,135.00
4,070.25
31,205.25

15% x D

A.4.7.1.10Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No
A

Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Plamuur
Cat dasar
Cat penutup (setara catylac)

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.020
50,000.00
0.063
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

1,000.00
4,410.00
472.50
225.00
6,107.50

Kg
Kg
Kg

0.100
0.100
0.260
JUMLAH HARGA

2,160.00
2,340.00
6,084.00
10,584.00

21,600.00
23,400.00
23,400.00
BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

16,691.50
2,503.73
19,195.23

15% x D

A.4.7.1.10Pengecatan 1 m2 tembok baru eksterior (1 lapis cat dasar, 2 lapis cat penutup)

No
A

Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Cat dasar
Cat penutup (setara Java)

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.020
50,000.00
0.063
70,000.00
0.006
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

1,000.00
4,410.00
472.50
225.00
6,107.50

Kg
Kg

0.100
23,400.00
0.260
55,000.00
JUMLAH HARGA BAHAN

2,340.00
14,300.00
16,640.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

22,747.50
3,412.13
26,159.63

15% x D

A.4.7.1.11Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

No
A

Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Cat dasar
Cat penutup (setara catylac)

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.028
50,000.00
0.042
70,000.00
0.004
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

1,400.00
2,940.00
315.00
225.00
4,880.00

Kg
Kg

0.120
23,400.00
0.180
23,400.00
JUMLAH HARGA BAHAN

2,808.00
4,212.00
7,020.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

11,900.00
1,785.00
13,685.00

15% x D

A.4.7.1.16Pengecatan 1 m2 permukaan baja dengan menie besi

No
A

Uraian
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Menie besi
Kuas

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.020
50,000.00
0.200
70,000.00
0.020
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

1,000.00
14,000.00
1,500.00
187.50
16,687.50

Kg
Bh

0.100
24,100.00
0.010
8,900.00
JUMLAH HARGA BAHAN

2,410.00
89.00
2,499.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

19,186.50
2,877.98
22,064.48

15% x D

A.4.7.1.20Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Cat dasar
Cat antara
Cat penutup
Kuas
Pengencer

OH
OH
OH
OH

0.400
50,000.00
0.800
70,000.00
0.080
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

20,000.00
56,000.00
6,000.00
1,500.00
83,500.00

Kg
Kg
Kg
Bh
L

0.110
0.170
0.080
0.010
0.010
JUMLAH HARGA

5,500.00
8,500.00
4,000.00
89.00
191.00
18,280.00

50,000.00
50,000.00
50,000.00
8,900.00
19,100.00
BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

101,780.00
15,267.00
117,047.00

15% x D

PEKERJAAN KUNCI & KACA


A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kunci tanam biasa

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.010
50,000.00
0.500
70,000.00
0.050
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

500.00
35,000.00
3,750.00
375.00
39,625.00

Bh

1.000
79,000.00
JUMLAH HARGA BAHAN

79,000.00
79,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

118,625.00
17,793.75
136,418.75

15% x D

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kunci tanam KM

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.005
50,000.00
0.500
70,000.00
0.050
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

Bh

1.000 #
JUMLAH HARGA BAHAN

Jumlah
Harga
(Rp)
250.00
35,000.00
3,750.00
225.00
39,225.00
#VALUE!
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.6.2.4. Pemasangan 1 buah kunci silinder

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Kunci silinder

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.005
50,000.00
0.500
70,000.00
0.050
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

250.00
35,000.00
3,750.00
225.00
39,225.00

Bh

1.000
55,600.00
JUMLAH HARGA BAHAN

55,600.00
55,600.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

94,825.00
14,223.75
109,048.75

15% x D

A.4.6.2.5. Pemasangan 1 buah engsel pintu

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Engsel pintu

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

750.00
10,500.00
1,125.00
60.00
12,435.00

Bh

1.000
18,500.00
JUMLAH HARGA BAHAN

18,500.00
18,500.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

30,935.00
4,640.25
35,575.25

15% x D

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

No
A

Uraian
TENAGA
Pekerja

Kode

L.01

Satua Koefisie
n
n
OH

0.010

Harga
Satuan
(Rp)
50,000.00

Jumlah
Harga
(Rp)
500.00

Tukang Kayu
Kepala Tukang
Mandor
B

L.02
L.03
L.04

BAHAN
Engsel Kupu-kupu

OH
OH
OH

0.100
70,000.00
0.010
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

7,000.00
750.00
37.50
8,287.50

Bh

1.000
15,000.00
JUMLAH HARGA BAHAN

15,000.00
15,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

23,287.50
3,493.13
26,780.63

15% x D

A.4.6.2.9. Pemasangan 1 buah kait angin

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kait Angin

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

750.00
10,500.00
1,125.00
600.00
12,975.00

Bh

1.000
5,500.00
JUMLAH HARGA BAHAN

5,500.00
5,500.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

18,475.00
2,771.25
21,246.25

15% x D

A.4.6.2.10Pemasangan 1 buah Door Closer

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Door Closer

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.050
50,000.00
0.500
70,000.00
0.050
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

2,500.00
35,000.00
3,750.00
225.00
41,475.00

Bh

1.000
195,000.00
JUMLAH HARGA BAHAN

195,000.00
195,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

236,475.00
35,471.25
271,946.25

A.4.6.2.12Pemasangan 1 buah Door Holder

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.050
50,000.00
0.500
70,000.00
0.050
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

2,500.00
35,000.00
3,750.00
225.00
41,475.00

Bh

1.000
116,900.00
JUMLAH HARGA BAHAN

116,900.00
116,900.00

BAHAN
Door Holder
PERALATAN

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

158,375.00
23,756.25
182,131.25

15% x D

A.4.6.2.13Pemasangan 1 buah Door Stop

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.010
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

500.00
7,000.00
750.00
375.00
8,625.00

Bh

1.000
16,900.00
JUMLAH HARGA BAHAN

16,900.00
16,900.00

BAHAN
Door Stop
PERALATAN

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

25,525.00
3,828.75
29,353.75

15% x D

A.4.6.2.14Pemasangan 1 buah rel pintu sorong

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Rel Pintu Sorong
PERALATAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.060
50,000.00
0.600
70,000.00
0.060
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

Bh

1.000 #
JUMLAH HARGA BAHAN

Jumlah
Harga
(Rp)
3,000.00
42,000.00
4,500.00
225.00
49,725.00
#VALUE!
#VALUE!

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.4.6.2.16Pemasangan 1 m2 kaca tebal 3 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

Satua Koefisie
n
n

L.01
L.02
L.03
L.04

BAHAN
Kaca tebal 3 mm
Sealant

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

750.00
10,500.00
1,125.00
60.00
12,435.00

m2
Kg

1.100
60,000.00
0.050
13,500.00
JUMLAH HARGA BAHAN

66,000.00
675.00
66,675.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

79,110.00
11,866.50
90,976.50

15% x D

A.4.6.2.17Pemasangan 1 m2 kaca tebal 5 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

Satua Koefisie
n
n

L.01
L.02
L.03
L.04

BAHAN
Kaca tebal 5 mm
Sealant

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

750.00
10,500.00
1,125.00
60.00
12,435.00

m2
Kg

1.100
96,000.00
0.050
13,500.00
JUMLAH HARGA BAHAN

105,600.00
675.00
106,275.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

118,710.00
17,806.50
136,516.50

15% x D

A.4.6.2.17Pemasangan 1 m2 kaca tebal 5 mm

No
A

Uraian
TENAGA

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
B

L.01
L.02
L.03
L.04

BAHAN
Kaca tebal 5 mm

OH
OH
OH
OH

0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

m2

1.100

96,000.00

JUMLAH HARGA BAHAN


C

750.00
10,500.00
1,125.00
60.00
12,435.00
105,600.00
105,600.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

118,035.00
17,705.25
135,740.25

15% x D

A.4.6.2.19Pemasangan 1 m2 kaca buram tebal 12 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Kaca buram tebal 12 mm
Sealant

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.025
50,000.00
0.250
70,000.00
0.025
75,000.00
0.001
75,000.00
JUMLAH TENAGA KERJA

1,250.00
17,500.00
1,875.00
97.50
20,722.50

m2
Kg

1.100
298,000.00
0.070
13,500.00
JUMLAH HARGA BAHAN

327,800.00
945.00
328,745.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

349,467.50
52,420.13
401,887.63

15% x D

A.4.6.2.20Pemasangan 1 m2 kaca cermin tebal 5 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kaca cermin tebal 5 mm

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.015
50,000.00
0.150
70,000.00
0.015
75,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

750.00
10,500.00
1,125.00
600.00
12,975.00

m2

1.100
158,800.00
JUMLAH HARGA BAHAN

174,680.00
174,680.00

PERALATAN
JUMLAH HARGA ALAT

Jumlah
Harga
(Rp)

Jumlah (A+B+C)

187,655.00

E
F

Overhead + Profit 15%


Harga Satuan Pekerjaan (D+E)

15% x D

28,148.25
215,803.25

A.4.6.2.23Pemasangan 1 m2 kaca patri tebal 5 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Kaca patri 5 mm
Sealant

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.075
50,000.00
0.150
70,000.00
0.015
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

3,750.00
10,500.00
1,125.00
300.00
15,675.00

m2
Kg

1.100
300,000.00
0.050
13,500.00
JUMLAH HARGA BAHAN

330,000.00
675.00
330,675.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

346,350.00
51,952.50
398,302.50

15% x D

PEKERJAAN SANITASI GEDUNG


A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Closet duduk
Perlengkapan 6 % Closet

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

3.300
50,000.00
1.100
70,000.00
0.010
75,000.00
0.160
75,000.00
JUMLAH TENAGA KERJA

165,000.00
77,000.00
750.00
12,000.00
254,750.00

Unit
Ls

1.000
373,700.00
0.060
373,700.00
JUMLAH HARGA BAHAN

373,700.00
22,422.00
396,122.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

650,872.00
97,630.80
748,502.80

15% x D

A.5.1.1.2. Pemasangan 1 buah closet jongkok porslen

No
A

Uraian
TENAGA
Pekerja
Tukang Batu

Satua Koefisie
Kode
n
n
L.01
L.02

OH
OH

1.000
1.500

Harga
Satuan
(Rp)
50,000.00
70,000.00

Jumlah
Harga
(Rp)
50,000.00
105,000.00

Kepala Tukang
Mandor
B

L.03
L.04

BAHAN
Closet Jongkok
Semen Portland
Pasir Pasang

OH
OH

0.150
75,000.00
0.160
75,000.00
JUMLAH TENAGA KERJA

11,250.00
12,000.00
178,250.00

Unit
Kg
M3

1.000
137,200.00
6.000
1,500.00
0.010
158,300.00
JUMLAH HARGA BAHAN

137,200.00
9,000.00
1,583.00
147,783.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

326,033.00
48,904.95
374,937.95

15% x D

A.5.1.1.4. Pemasangan 1 buah urinoir

No
A

Uraian

Kode

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Urinoir
Semen Portland
Pasir Pasang
Perlengkapan 30 % Urinoir

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.000
50,000.00
1.000
70,000.00
0.100
75,000.00
0.050
75,000.00
JUMLAH TENAGA KERJA

50,000.00
70,000.00
7,500.00
3,750.00
131,250.00

Unit
Kg
M3
Ls

1.000
350,000.00
6.000
1,500.00
0.010
158,300.00
0.300
350,000.00
JUMLAH HARGA BAHAN

350,000.00
9,000.00
1,583.00
105,000.00
465,583.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

596,833.00
89,524.95
686,357.95

15% x D

A.5.1.1.5. Pemasangan 1 buah wastafel

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Wastafel
Semen Portland
Pasir Pasang
Perlengkapan 12 % Wastafel
PERALATAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.200
50,000.00
1.450
70,000.00
0.150
75,000.00
0.060
75,000.00
JUMLAH TENAGA KERJA

60,000.00
101,500.00
11,250.00
4,500.00
177,250.00

Unit
Kg
M3
Ls

1.200 #
#VALUE!
6.000
1,500.00
9,000.00
0.010
158,300.00
1,583.00
0.120 #
#VALUE!
JUMLAH HARGA BAHAN
#VALUE!

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.5.1.1.5aPemasangan 1 buah wastafel

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Wastafel
Semen Portland
Pasir Pasang
Perlengkapan 12 % Wastafel

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

1.200
50,000.00
1.450
70,000.00
0.150
75,000.00
0.060
75,000.00
JUMLAH TENAGA KERJA

60,000.00
101,500.00
11,250.00
4,500.00
177,250.00

Unit
Kg
M3
Ls

1.000
225,000.00
6.000
1,500.00
0.010
158,300.00
0.120
225,000.00
JUMLAH HARGA BAHAN

225,000.00
9,000.00
1,583.00
27,000.00
262,583.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

439,833.00
65,974.95
505,807.95

15% x D

A.5.1.1.10Pemasangan 1 buah bak air fibreglass vol 1 m3

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Bak Air Fibreglass
Perlengkapan 12%

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

3.000
50,000.00
4.500
70,000.00
0.050
75,000.00
0.900
75,000.00
JUMLAH TENAGA KERJA

Unit
Ls

1.000 #
0.120 #
JUMLAH HARGA BAHAN

Jumlah
Harga
(Rp)
150,000.00
315,000.00
3,750.00
67,500.00
536,250.00
#VALUE!
#VALUE!
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.5.1.1.18Pemasangan 1 m' pipa galvanis diameter "

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan

Jumlah
Harga

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Pipa Galvanis "
Perlengkapan 35% x pipa

Satua Koefisie
n
n

(Rp)

(Rp)

OH
OH
OH
OH

0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.027
75,000.00
JUMLAH TENAGA KERJA

2,700.00
6,300.00
675.00
2,025.00
11,700.00

M
Ls

1.200
30,600.00
0.350
30,600.00
JUMLAH HARGA BAHAN

36,720.00
10,710.00
47,430.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

59,130.00
8,869.50
67,999.50

15% x D

A.5.1.1.19Pemasangan 1 buah kran diameter "

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Kran Air "
Sealtape

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.010
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

500.00
7,000.00
750.00
375.00
8,625.00

bh
bh

1.000
18,600.00
0.025
3,023.13
JUMLAH HARGA BAHAN

18,600.00
75.58
18,675.58

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

27,300.58
4,095.09
31,395.66

15% x D

A.5.1.1.19Pemasangan 1 buah kran diameter 3/4"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kran Air 3/4"
Sealtape
PERALATAN

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.010
50,000.00
0.100
70,000.00
0.010
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

500.00
7,000.00
750.00
375.00
8,625.00

bh
bh

1.000
18,900.00
0.025
3,023.13
JUMLAH HARGA BAHAN

18,900.00
75.58
18,975.58

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

27,600.58
4,140.09
31,740.66

15% x D

A.5.1.1.20Pemasangan 1 m' pipa galvanis diameter 3/4"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Pipa Galvanis 3/4"
Perlengkapan 35% x pipa

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.027
75,000.00
JUMLAH TENAGA KERJA

2,700.00
6,300.00
675.00
2,025.00
11,700.00

M
Ls

1.200
42,800.00
0.350
42,800.00
JUMLAH HARGA BAHAN

51,360.00
14,980.00
66,340.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

78,040.00
11,706.00
89,746.00

15% x D

A.5.1.1.21Pemasangan 1 m' pipa galvanis diameter 1"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Pipa Galvanis 1"
Perlengkapan 35% x pipa

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.027
75,000.00
JUMLAH TENAGA KERJA

2,700.00
6,300.00
675.00
2,025.00
11,700.00

M
Ls

1.200
55,100.00
0.350
55,100.00
JUMLAH HARGA BAHAN

66,120.00
19,285.00
85,405.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

97,105.00
14,565.75
111,670.75

15% x D

A.5.1.1.22Pemasangan 1 m' pipa galvanis diameter 1 "

No
A

Uraian
TENAGA
Pekerja

Kode

L.01

Satua Koefisie
n
n
OH

0.108

Harga
Satuan
(Rp)
50,000.00

Jumlah
Harga
(Rp)
5,400.00

Tukang Batu
Kepala Tukang
Mandor
B

L.02
L.03
L.04

BAHAN
Pipa Galvanis 1 "
Perlengkapan 35% x pipa

OH
OH
OH

0.180
70,000.00
0.018
75,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

12,600.00
1,350.00
375.00
19,725.00

M
Ls

1.200
67,400.00
0.350
67,400.00
JUMLAH HARGA BAHAN

80,880.00
23,590.00
104,470.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

124,195.00
18,629.25
142,824.25

15% x D

A.5.1.1.23Pemasangan 1 m' pipa galvanis diameter 3"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Pipa Galvanis 3"
Perlengkapan 35% x pipa

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.135
50,000.00
0.225
70,000.00
0.023
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA

6,750.00
15,750.00
1,725.00
525.00
24,750.00

M
Ls

1.200
203,200.00
0.350
203,200.00
JUMLAH HARGA BAHAN

243,840.00
71,120.00
314,960.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

339,710.00
50,956.50
390,666.50

15% x D

A.5.1.1.24Pemasangan 1 m' pipa galvanis diameter 4"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa Galvanis 4"
Perlengkapan 35% x pipa

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.135
50,000.00
0.225
70,000.00
0.023
75,000.00
0.007
75,000.00
JUMLAH TENAGA KERJA

6,750.00
15,750.00
1,725.00
525.00
24,750.00

M
Ls

1.200
283,450.00
0.350
283,450.00
JUMLAH HARGA BAHAN

340,140.00
99,207.50
439,347.50

PERALATAN
JUMLAH HARGA ALAT

Jumlah
Harga
(Rp)

Jumlah (A+B+C)

464,097.50

E
F

Overhead + Profit 15%


Harga Satuan Pekerjaan (D+E)

15% x D

69,614.63
533,712.13

A.5.1.1.25Pemasangan 1 m' pipa PVC tipe AW diameter "

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Pipa PVC "
Perlengkapan 35% x pipa

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.036
50,000.00
0.060
70,000.00
0.006
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

1,800.00
4,200.00
450.00
150.00
6,600.00

M
Ls

1.200
10,700.00
0.350
10,700.00
JUMLAH HARGA BAHAN

12,840.00
3,745.00
16,585.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

23,185.00
3,477.75
26,662.75

15% x D

A.5.1.1.26Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Pipa PVC 3/4"
Perlengkapan 35% x pipa

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.036
50,000.00
0.060
70,000.00
0.006
75,000.00
0.002
75,000.00
JUMLAH TENAGA KERJA

1,800.00
4,200.00
450.00
150.00
6,600.00

M
Ls

1.200
12,800.00
0.350
12,800.00
JUMLAH HARGA BAHAN

15,360.00
4,480.00
19,840.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

26,440.00
3,966.00
30,406.00

15% x D

A.5.1.1.27Pemasangan 1 m' pipa PVC tipe AW diameter 1"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

0.036
0.060
0.006
0.002

Harga
Satuan
(Rp)
50,000.00
70,000.00
75,000.00
75,000.00

Jumlah
Harga
(Rp)
1,800.00
4,200.00
450.00
150.00

JUMLAH TENAGA KERJA


B

BAHAN
Pipa PVC 1"
Perlengkapan 35% x pipa

M
Ls

1.200
17,300.00
0.350
17,300.00
JUMLAH HARGA BAHAN

6,600.00
20,760.00
6,055.00
26,815.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

33,415.00
5,012.25
38,427.25

15% x D

A.5.1.1.28Pemasangan 1 m' pipa PVC tipe AW diameter 1 "

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

BAHAN
Pipa PVC 1 "
Perlengkapan 35% x pipa

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

2,700.00
6,300.00
675.00
225.00
9,900.00

M
Ls

1.200
23,300.00
0.350
23,300.00
JUMLAH HARGA BAHAN

27,960.00
8,155.00
36,115.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

46,015.00
6,902.25
52,917.25

15% x D

A.5.1.1.29Pemasangan 1 m' pipa PVC tipe AW diameter 2"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC 2"
Perlengkapan 35% x pipa

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.054
50,000.00
0.090
70,000.00
0.009
75,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

2,700.00
6,300.00
675.00
225.00
9,900.00

M
Ls

1.200
21,000.00
0.350
21,000.00
JUMLAH HARGA BAHAN

25,200.00
7,350.00
32,550.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

42,450.00
6,367.50
48,817.50

A.5.1.1.30Pemasangan 1 m' pipa PVC tipe AW diameter 2 "

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Pipa PVC 2 "
Perlengkapan 35% x pipa

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.081
50,000.00
0.135
70,000.00
0.014
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

4,050.00
9,450.00
1,012.50
300.00
14,812.50

M
Ls

1.200
28,100.00
0.350
28,100.00
JUMLAH HARGA BAHAN

33,720.00
9,835.00
43,555.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

58,367.50
8,755.13
67,122.63

15% x D

A.5.1.1.31Pemasangan 1 m' pipa PVC tipe AW diameter 3"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Pipa PVC 3"
Perlengkapan 35% x pipa

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.081
50,000.00
0.135
70,000.00
0.014
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

4,050.00
9,450.00
1,012.50
300.00
14,812.50

M
Ls

1.200
40,700.00
0.350
40,700.00
JUMLAH HARGA BAHAN

48,840.00
14,245.00
63,085.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

77,897.50
11,684.63
89,582.13

15% x D

A.5.1.1.32Pemasangan 1 m' pipa PVC tipe AW diameter 4"

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC 4"

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

OH
OH
OH
OH

Harga
Satuan
(Rp)

0.081
50,000.00
0.135
70,000.00
0.014
75,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA
1.200

64,300.00

Jumlah
Harga
(Rp)
4,050.00
9,450.00
1,012.50
300.00
14,812.50
77,160.00

Perlengkapan 35% x pipa


C

Ls

0.350
64,300.00
JUMLAH HARGA BAHAN

22,505.00
99,665.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

114,477.50
17,171.63
131,649.13

15% x D

PEKERJAAN PERHITUNGAN SENDIRI


BOW.M.15Pasang 1 m2 Paving Natural tebal 6 cm K 175

No
A

Uraian

Kode

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Paving K.175 tebal
(setara
muntilan)
Pasir urug

L.01
L.02
L.03
L.04

cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

20,000.00
1,400.00
1,500.00
1,500.00
24,400.00

m2
m3

1.000
75,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN

75,000.00
13,902.00
88,902.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

113,302.00
16,995.30
130,297.30

15% x D

BOW.M.15Pasang 1 m2 paving warna tebal 6 cm K 175

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Paving Warna K.175 tebal 6 cm
(str.
PasirMuntilan)
urug

Satua Koefisie
Kode
n
n
L.01
L.02
L.03
L.04

Harga
Satuan
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

20,000.00
1,400.00
1,500.00
1,500.00
24,400.00

m2
m3

1.000
85,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN

85,000.00
13,902.00
98,902.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

BOW.M.15Pasang 1 m2 paving Natural tebal 8 cm K 175

123,302.00
18,495.30
141,797.30

No
A

Uraian

Kode

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Paving K.175 tebal
(setara
muntilan)
Pasir urug

L.01
L.02
L.03
L.04

cm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

20,000.00
1,400.00
1,500.00
1,500.00
24,400.00

m2
m3

1.000
90,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN

90,000.00
13,902.00
103,902.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

128,302.00
19,245.30
147,547.30

15% x D

BOW.M.15Pasang 1 m2 paving warna tebal 8 cm K 175

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Paving warna K.175 tebal 8 cm
(str.
PasirMuntilan)
urug

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

20,000.00
1,400.00
1,500.00
1,500.00
24,400.00

m2
m3

1.000
98,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN

98,000.00
13,902.00
111,902.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

136,302.00
20,445.30
156,747.30

15% x D

BOW.M.15Pasang 1 m2 paving natural Tbl. 6 cm (Lokal)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Paving Blok tebal 6 cm (lokal)
Pasir urug

Kode

L.01
L.02
L.03
L.04

Satua Koefisie
n
n
OH
OH
OH
OH

m2
m3

Harga
Satuan
(Rp)

0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA
1.000
0.105

65,000.00
132,400.00

Jumlah
Harga
(Rp)
20,000.00
1,400.00
1,500.00
1,500.00
24,400.00
65,000.00
13,902.00

JUMLAH HARGA BAHAN


C

78,902.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

103,302.00
15,495.30
118,797.30

15% x D

BOW.M.15Pasang 1 m2 paving warna Tbl. 6 cm (Lokal)

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Kode

L.01
L.02
L.03
L.04

BAHAN
Paving Blok warna tebal 6 cm
(lokal)
Pasir urug

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH
OH

0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

20,000.00
1,400.00
1,500.00
1,500.00
24,400.00

m2
m3

1.000
68,000.00
0.105
132,400.00
JUMLAH HARGA BAHAN

68,000.00
13,902.00
81,902.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

106,302.00
15,945.30
122,247.30

15% x D

BOW.G.5bPasang 1 m3 Bronjong penahan kawat 4 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Batu
Mandor

Kode

L.01
L.02
L.04

BAHAN
Batu kali
Kawat Bronjong 4 mm

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

2.100
50,000.00
0.730
70,000.00
0.052
75,000.00
JUMLAH TENAGA KERJA

105,000.00
51,100.00
3,900.00
160,000.00

m3
kg

1.000
176,200.00
15.000
21,700.00
JUMLAH HARGA BAHAN

176,200.00
325,500.00
501,700.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

661,700.00
99,255.00
760,955.00

15% x D

BOW.M.15Pasang 1 m2 Grass Block tebal 6 cm K 175

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

BAHAN
Grass Block tebal 6 cm
Pasir urug

OH
OH
OH
OH

0.400
50,000.00
0.020
70,000.00
0.020
75,000.00
0.020
75,000.00
JUMLAH TENAGA KERJA

20,000.00
1,400.00
1,500.00
1,500.00
24,400.00

m2
m3

1.000 #
#VALUE!
0.105
132,400.00
13,902.00
JUMLAH HARGA BAHAN
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.1. HARGA SATUAN PEKERJAAN PEMASANGAN PIPA


A.8.4.1.1 Pemasangan 1 m pipa PVC 63 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

Satua Koefisie
n
n

L.01
L.02
L.04

BAHAN
Pipa PVC 63 mm
PERALATAN
Tripot/Tackel & handle crane 2 E.64
T

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.081
50,000.00
0.041
70,000.00
0.008
75,000.00
JUMLAH TENAGA KERJA

4,050.00
2,870.00
600.00
7,520.00

1.000
29,000.00
JUMLAH HARGA BAHAN

29,000.00
29,000.00

hari

0.006
81,060.00
JUMLAH HARGA ALAT

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

486.36
486.36
37,006.36
5,550.95
42,557.31

15% x D

A.8.4.1.2 Pemasangan 1 m pipa PVC 90 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Pipa PVC 90 mm
PERALATAN
Tripot/Tackel & handle crane 2 E.64
T
Jumlah (A+B+C)

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.094
50,000.00
0.047
70,000.00
0.009
75,000.00
JUMLAH TENAGA KERJA

4,700.00
3,290.00
675.00
8,665.00

1.000
60,550.00
JUMLAH HARGA BAHAN

60,550.00
60,550.00

hari

0.008
81,060.00
JUMLAH HARGA ALAT

648.48
648.48
69,863.48

E
F

Overhead + Profit 15%


Harga Satuan Pekerjaan (D+E)

15% x D

10,479.52
80,343.00

A.8.4.1.3 Pemasangan 1 m pipa PVC 110 mm

No
A

D
E
F

Uraian

Satua Koefisie
Kode
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

TENAGA
Pekerja
Tukang Pipa
Mandor

L.01
L.02
L.04

OH
OH
OH

0.105
50,000.00
0.053
70,000.00
0.011
75,000.00
JUMLAH TENAGA KERJA

5,250.00
3,710.00
825.00
9,785.00

BAHAN
Pipa PVC 110 mm

E.64

1.000
88,850.00
JUMLAH HARGA BAHAN

88,850.00
88,850.00

hari

0.010
81,060.00
JUMLAH HARGA ALAT

PERALATAN
Tripot/Tackel & handle crane 2
T
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

810.60
810.60
99,445.60
14,916.84
114,362.44

15% x D

A.8.4.1.4 Pemasangan 1 m pipa PVC 150 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.04

BAHAN
Pipa PVC 150 mm
PERALATAN
Tripot/Tackel & handle crane 2 E.64
T

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.118
50,000.00
0.059
70,000.00
0.012
75,000.00
JUMLAH TENAGA KERJA

5,900.00
4,130.00
900.00
10,930.00

1.000
190,000.00
JUMLAH HARGA BAHAN

190,000.00
190,000.00

hari

0.012
81,060.00
JUMLAH HARGA ALAT

972.72
972.72

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

201,902.72
30,285.41
232,188.13

15% x D

A.8.4.1.5 Pemasangan 1 m pipa PVC 200 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Pipa PVC 200 mm
PERALATAN

Kode

L.01
L.02
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.189
50,000.00
0.095
70,000.00
0.019
75,000.00
JUMLAH TENAGA KERJA

9,450.00
6,650.00
1,425.00
17,525.00

1.000
296,800.00
JUMLAH HARGA BAHAN

296,800.00
296,800.00

Tripot/Tackel & handle crane 2 E.64


T
D
E
F

hari

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

0.024
81,060.00
JUMLAH HARGA ALAT

1,945.44
1,945.44
316,270.44
47,440.57
363,711.01

15% x D

A.8.4.1.6 Pemasangan 1 m pipa PVC 250 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Pipa PVC 250 mm
PERALATAN
Tripot/Tackel & handle crane 2 E.64
T

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.256
50,000.00
0.128
70,000.00
0.026
75,000.00
JUMLAH TENAGA KERJA

12,800.00
8,960.00
1,950.00
23,710.00

1.000
468,200.00
JUMLAH HARGA BAHAN

468,200.00
468,200.00

hari

0.034
81,060.00
JUMLAH HARGA ALAT

2,756.04
2,756.04

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

494,666.04
74,199.91
568,865.95

15% x D

A.8.4.1.7 Pemasangan 1 m pipa PVC 300 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Pipa PVC 300 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH

0.294
50,000.00
0.147
70,000.00
0.029
75,000.00
JUMLAH TENAGA KERJA

1.000 #
JUMLAH HARGA BAHAN

hari

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

0.040
81,060.00
JUMLAH HARGA ALAT

Jumlah
Harga
(Rp)
14,700.00
10,290.00
2,175.00
27,165.00
#VALUE!
#VALUE!
3,242.40
3,242.40
#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.1.8 Pemasangan 1 m pipa PVC 400 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

Satua Koefisie
n
n
OH
OH
OH

Harga
Satuan
(Rp)

0.544
50,000.00
0.272
70,000.00
0.054
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
27,200.00
19,040.00
4,050.00
50,290.00

D
E
F

BAHAN
Pipa PVC 400 mm

PERALATAN
Tripot/Tackel & handle crane 2
T

hari

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1.000 #
JUMLAH HARGA BAHAN
0.080
81,060.00
JUMLAH HARGA ALAT

#VALUE!
#VALUE!
6,484.80
6,484.80
#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.1.17Pemasangan 1 m pipa HDPE 63 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Pipa HDPE 63 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.035
50,000.00
0.017
70,000.00
0.003
75,000.00
JUMLAH TENAGA KERJA

1,750.00
1,190.00
225.00
3,165.00

1.000
33,850.00
JUMLAH HARGA BAHAN

33,850.00
33,850.00

hari

0.019
81,060.00
JUMLAH HARGA ALAT

1,540.14
1,540.14

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

38,555.14
5,783.27
44,338.41

15% x D

A.8.4.1.18Pemasangan 1 m pipa HDPE 100 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Pipa HDPE 100 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.040
50,000.00
0.020
70,000.00
0.004
75,000.00
JUMLAH TENAGA KERJA

2,000.00
1,400.00
300.00
3,700.00

1.000
161,500.00
JUMLAH HARGA BAHAN

161,500.00
161,500.00

hari

0.019
81,060.00
JUMLAH HARGA ALAT

1,540.14
1,540.14

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

166,740.14
25,011.02
191,751.16

15% x D

A.8.4.1.19Pemasangan 1 m pipa HDPE 125 mm

No
A

Uraian
TENAGA

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

Pekerja
Tukang Pipa
Mandor
B

D
E
F

L.01
L.02
L.04

BAHAN
Pipa HDPE 125 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

OH
OH
OH

0.045
50,000.00
0.023
70,000.00
0.005
75,000.00
JUMLAH TENAGA KERJA

2,250.00
1,610.00
375.00
4,235.00

1.000
207,600.00
JUMLAH HARGA BAHAN

207,600.00
207,600.00

hari

0.019
81,060.00
JUMLAH HARGA ALAT

1,540.14
1,540.14

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

213,375.14
32,006.27
245,381.41

15% x D

A.8.4.1.20Pemasangan 1 m pipa HDPE 150 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Pipa HDPE 150 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.062
50,000.00
0.031
70,000.00
0.006
75,000.00
JUMLAH TENAGA KERJA

3,100.00
2,170.00
450.00
5,720.00

1.000
207,600.00
JUMLAH HARGA BAHAN

207,600.00
207,600.00

hari

0.019
81,060.00
JUMLAH HARGA ALAT

1,540.14
1,540.14

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

214,860.14
32,229.02
247,089.16

15% x D

A.8.4.1.21Pemasangan 1 m pipa HDPE 200 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Pipa HDPE 200 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Kode

L.01
L.02
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.102
50,000.00
0.051
70,000.00
0.010
75,000.00
JUMLAH TENAGA KERJA

5,100.00
3,570.00
750.00
9,420.00

1.000
299,000.00
JUMLAH HARGA BAHAN

299,000.00
299,000.00

hari

0.019
81,060.00
JUMLAH HARGA ALAT

1,540.14
1,540.14

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

A.8.4.1.22Pemasangan 1 m pipa HDPE 250 mm

15% x D

309,960.14
46,494.02
356,454.16

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Pipa HDPE 250 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.133
50,000.00
0.067
70,000.00
0.013
75,000.00
JUMLAH TENAGA KERJA

6,650.00
4,690.00
975.00
12,315.00

1.000
822,950.00
JUMLAH HARGA BAHAN

822,950.00
822,950.00

hari

0.042
81,060.00
JUMLAH HARGA ALAT

3,404.52
3,404.52

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

838,669.52
125,800.43
964,469.95

15% x D

A.8.4.1.23Pemasangan 1 m pipa HDPE 300 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.04

BAHAN
Pipa HDPE 300 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Harga
Satuan
(Rp)

OH
OH
OH

0.170
50,000.00
0.085
70,000.00
0.017
75,000.00
JUMLAH TENAGA KERJA

1.000 #
JUMLAH HARGA BAHAN

hari

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

Jumlah
Harga
(Rp)
8,500.00
5,950.00
1,275.00
15,725.00
#VALUE!
#VALUE!

0.065
81,060.00
JUMLAH HARGA ALAT

5,268.90
5,268.90
#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.1.24Pemasangan 1 m pipa HDPE 400 mm

No
A

D
E

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Pipa HDPE 400 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Jumlah (A+B+C)
Overhead + Profit 15%

Satua Koefisie
Kode
n
n
L.01
L.02
L.04

Harga
Satuan
(Rp)

OH
OH
OH

0.290
50,000.00
0.145
70,000.00
0.029
75,000.00
JUMLAH TENAGA KERJA

1.000 #
JUMLAH HARGA BAHAN

hari

0.152
81,060.00
JUMLAH HARGA ALAT

15% x D

Jumlah
Harga
(Rp)
14,500.00
10,150.00
2,175.00
26,825.00
#VALUE!
#VALUE!
12,321.12
12,321.12
#VALUE!
#VALUE!

Harga Satuan Pekerjaan (D+E)

#VALUE!

A.8.4.1.33Pemasangan 1 m pipa GIP 63 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

Satua Koefisie
n
n

L.01
L.02
L.04

BAHAN
Pipa GIP 63 mm

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.345
50,000.00
0.172
70,000.00
0.034
75,000.00
JUMLAH TENAGA KERJA

17,250.00
12,040.00
2,550.00
31,840.00

1.000
183,000.00
JUMLAH HARGA BAHAN

183,000.00
183,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

214,840.00
32,226.00
247,066.00

15% x D

A.8.4.1.34Pemasangan 1 m pipa GIP 100 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

Satua Koefisie
n
n

L.01
L.02
L.04

BAHAN
Pipa GIP 100 mm

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.400
50,000.00
0.200
70,000.00
0.040
75,000.00
JUMLAH TENAGA KERJA

20,000.00
14,000.00
3,000.00
37,000.00

1.000
467,700.00
JUMLAH HARGA BAHAN

467,700.00
467,700.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

504,700.00
75,705.00
580,405.00

15% x D

A.8.4.1.35Pemasangan 1 m pipa GIP 125 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Pipa GIP 125 mm
PERALATAN

Kode

L.01
L.02
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH

0.448
50,000.00
0.224
70,000.00
0.045
75,000.00
JUMLAH TENAGA KERJA

1.000 #
JUMLAH HARGA BAHAN

Jumlah
Harga
(Rp)
22,400.00
15,680.00
3,375.00
41,455.00
#VALUE!
#VALUE!

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.1.36Pemasangan 1 m pipa GIP 150 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

Satua Koefisie
n
n

L.01
L.02
L.04

BAHAN
Pipa GIP 150 mm

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.506
50,000.00
0.253
70,000.00
0.051
75,000.00
JUMLAH TENAGA KERJA

25,300.00
17,710.00
3,825.00
46,835.00

1.000
678,000.00
JUMLAH HARGA BAHAN

678,000.00
678,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

724,835.00
108,725.25
833,560.25

15% x D

A.8.4.1.37Pemasangan 1 m pipa GIP 200 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

Satua Koefisie
n
n

L.01
L.02
L.04

BAHAN
Pipa GIP 200 mm

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.796
50,000.00
0.398
70,000.00
0.080
75,000.00
JUMLAH TENAGA KERJA

39,800.00
27,860.00
6,000.00
73,660.00

1.000
1,032,000.00
JUMLAH HARGA BAHAN

1,032,000.00
1,032,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1,105,660.00
165,849.00
1,271,509.00

15% x D

A.8.4.1.38Pemasangan 1 m pipa GIP 250 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN

Kode

L.01
L.02
L.04

Satua Koefisie
n
n
OH
OH
OH

Harga
Satuan
(Rp)

0.949
50,000.00
0.475
70,000.00
0.095
75,000.00
JUMLAH TENAGA KERJA

Jumlah
Harga
(Rp)
47,450.00
33,250.00
7,125.00
87,825.00

Pipa GIP 250 mm


C

1.000 #
JUMLAH HARGA BAHAN

#VALUE!
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.1.39Pemasangan 1 m pipa GIP 300 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

Satua Koefisie
n
n

L.01
L.02
L.04

Harga
Satuan
(Rp)

OH
OH
OH

0.958
50,000.00
0.479
70,000.00
0.096
75,000.00
JUMLAH TENAGA KERJA

1.000 #
JUMLAH HARGA BAHAN

BAHAN
Pipa GIP 300 mm

Jumlah
Harga
(Rp)
47,900.00
33,530.00
7,200.00
88,630.00
#VALUE!
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.1.40Pemasangan 1 m pipa GIP 400 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH

1.212
50,000.00
0.606
70,000.00
0.121
75,000.00
JUMLAH TENAGA KERJA

1.000 #
JUMLAH HARGA BAHAN

BAHAN
Pipa GIP 300 mm

Jumlah
Harga
(Rp)
60,600.00
42,420.00
9,075.00
112,095.00
#VALUE!
#VALUE!

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


A.8.4.3.1 Pemasangan 1 buah Valve 150 mm

No

Uraian

Kode

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

D
E
F

TENAGA
Pekerja
Tukang Pipa
Mandor

L.01
L.02
L.04

OH
OH
OH

1.429
50,000.00
0.715
70,000.00
0.143
75,000.00
JUMLAH TENAGA KERJA

71,450.00
50,050.00
10,725.00
132,225.00

bh

1.000
3,453,450.00
JUMLAH HARGA BAHAN

3,453,450.00
3,453,450.00

hari

0.100
81,060.00
JUMLAH HARGA ALAT

8,106.00
8,106.00

BAHAN
Valve 150 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

3,593,781.00
539,067.15
4,132,848.15

15% x D

A.8.4.3.2 Pemasangan 1 buah Valve 200 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

Satua Koefisie
n
n

Jumlah
Harga
(Rp)

OH
OH
OH

1.714
50,000.00
0.857
70,000.00
0.171
75,000.00
JUMLAH TENAGA KERJA

85,700.00
59,990.00
12,825.00
158,515.00

bh

1.000
5,512,200.00
JUMLAH HARGA BAHAN

5,512,200.00
5,512,200.00

hari

0.300
81,060.00
JUMLAH HARGA ALAT

24,318.00
24,318.00

BAHAN
Valve 200 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Harga
Satuan
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

5,695,033.00
854,254.95
6,549,287.95

15% x D

A.8.4.3.3 Pemasangan 1 buah Valve 250 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

Satua Koefisie
n
n

Jumlah
Harga
(Rp)

OH
OH
OH

1.714
50,000.00
0.857
70,000.00
0.171
75,000.00
JUMLAH TENAGA KERJA

85,700.00
59,990.00
12,825.00
158,515.00

bh

1.000
8,301,500.00
JUMLAH HARGA BAHAN

8,301,500.00
8,301,500.00

hari

0.400
81,060.00
JUMLAH HARGA ALAT

32,424.00
32,424.00

BAHAN
Valve 250 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Harga
Satuan
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

A.8.4.3.4 Pemasangan 1 buah Valve 300 mm

15% x D

8,492,439.00
1,273,865.85
9,766,304.85

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

Satua Koefisie
n
n
OH
OH
OH

2.000
50,000.00
1.000
70,000.00
0.200
75,000.00
JUMLAH TENAGA KERJA

bh

1.000 #
JUMLAH HARGA BAHAN

BAHAN
Valve 300 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Harga
Satuan
(Rp)

hari

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

0.500
81,060.00
JUMLAH HARGA ALAT

Jumlah
Harga
(Rp)
100,000.00
70,000.00
15,000.00
185,000.00
#VALUE!
#VALUE!
40,530.00
40,530.00
#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.3.5 Pemasangan 1 buah Valve 400 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Valve 300 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH

3.429
50,000.00
1.715
70,000.00
0.343
75,000.00
JUMLAH TENAGA KERJA

bh

1.000 #
JUMLAH HARGA BAHAN

hari

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1.000
81,060.00
JUMLAH HARGA ALAT

Jumlah
Harga
(Rp)
171,450.00
120,050.00
25,725.00
317,225.00
#VALUE!
#VALUE!
81,060.00
81,060.00
#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.3.15Pemasangan 1 buah Tee 150 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Tee 150 mm
PERALATAN
Tripot/Tackel & handle crane 2
T
Jumlah (A+B+C)

Kode

L.01
L.02
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.106
50,000.00
0.053
70,000.00
0.011
75,000.00
JUMLAH TENAGA KERJA

5,300.00
3,710.00
825.00
9,835.00

bh

1.000
772,700.00
JUMLAH HARGA BAHAN

772,700.00
772,700.00

hari

0.028
81,060.00
JUMLAH HARGA ALAT

2,269.68
2,269.68
784,804.68

E
F

Overhead + Profit 15%


Harga Satuan Pekerjaan (D+E)

15% x D

117,720.70
902,525.38

A.8.4.3.16Pemasangan 1 buah Tee 200 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.04

BAHAN
Tee 200 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.216
50,000.00
0.108
70,000.00
0.022
75,000.00
JUMLAH TENAGA KERJA

10,800.00
7,560.00
1,650.00
20,010.00

bh

1.000
1,783,000.00
JUMLAH HARGA BAHAN

1,783,000.00
1,783,000.00

hari

0.029
81,060.00
JUMLAH HARGA ALAT

2,350.74
2,350.74

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1,805,360.74
270,804.11
2,076,164.85

15% x D

A.8.4.3.17Pemasangan 1 buah Tee 250 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Satua Koefisie
Kode
n
n
L.01
L.02
L.04

BAHAN
Tee 250 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH
OH

0.326
50,000.00
0.163
70,000.00
0.033
75,000.00
JUMLAH TENAGA KERJA

16,300.00
11,410.00
2,475.00
30,185.00

bh

1.000
1,245,200.00
JUMLAH HARGA BAHAN

1,245,200.00
1,245,200.00

hari

0.039
81,060.00
JUMLAH HARGA ALAT

3,161.34
3,161.34

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1,278,546.34
191,781.95
1,470,328.29

15% x D

A.8.4.3.18Pemasangan 1 buah Tee 300 mm

No
A

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor
BAHAN
Tee 300 mm
PERALATAN

Kode

L.01
L.02
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH

0.436
50,000.00
0.218
70,000.00
0.044
75,000.00
JUMLAH TENAGA KERJA

bh

1.000 #
JUMLAH HARGA BAHAN

Jumlah
Harga
(Rp)
21,800.00
15,260.00
3,300.00
40,360.00
#VALUE!
#VALUE!

Tripot/Tackel & handle crane 2


T
D
E
F

hari

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

0.500
81,060.00
JUMLAH HARGA ALAT

40,530.00
40,530.00
#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.3.19Pemasangan 1 buah Tee 400 mm

No
A

D
E
F

Uraian
TENAGA
Pekerja
Tukang Pipa
Mandor

Kode

L.01
L.02
L.04

BAHAN
Tee 400 mm
PERALATAN
Tripot/Tackel & handle crane 2
T

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH
OH

0.656
50,000.00
0.328
70,000.00
0.066
75,000.00
JUMLAH TENAGA KERJA

bh

1.000 #
JUMLAH HARGA BAHAN

hari

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

0.500
81,060.00
JUMLAH HARGA ALAT

Jumlah
Harga
(Rp)
32,800.00
22,960.00
4,950.00
60,710.00
#VALUE!
#VALUE!
40,530.00
40,530.00
#VALUE!
#VALUE!
#VALUE!

15% x D

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


A.8.4.5.1 Pengetesan 1 m pipa 50 mm

No
A

Uraian
TENAGA
Pekerja
Mandor

Kode

L.01
L.04

BAHAN
Air test (air bersih)
Bahan bakar
Oli

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH

0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA

400.00
60.00
460.00

m3
liter
liter

0.002
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN

200.00
552.00
60.00
812.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1,272.00
190.80
1,462.80

15% x D

A.8.4.5.2 Pengetesan 1 m pipa 75 mm

No
A

Uraian
TENAGA
Pekerja

Kode

L.01

Satua Koefisie
n
n
OH

0.008

Harga
Satuan
(Rp)
50,000.00

Jumlah
Harga
(Rp)
400.00

Mandor
B

L.04

BAHAN
Air test (air bersih)
Bahan bakar
Oli

OH

0.0008
75,000.00
JUMLAH TENAGA KERJA

60.00
460.00

m3
liter
liter

0.004
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN

400.00
552.00
60.00
1,012.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1,472.00
220.80
1,692.80

15% x D

A.8.4.5.3 Pengetesan 1 m pipa 100 mm

No
A

Uraian
TENAGA
Pekerja
Mandor

Kode

L.01
L.04

BAHAN
Air test (air bersih)
Bahan bakar
Oli

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH

0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA

400.00
60.00
460.00

m3
liter
liter

0.008
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN

800.00
552.00
60.00
1,412.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

1,872.00
280.80
2,152.80

15% x D

A.8.4.5.4 Pengetesan 1 m pipa 150 mm

No
A

Uraian
TENAGA
Pekerja
Mandor
BAHAN
Air test (air bersih)
Bahan bakar
Oli

Kode

L.01
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

OH
OH

0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA

400.00
60.00
460.00

m3
liter
liter

0.018
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN

1,800.00
552.00
60.00
2,412.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah
Harga
(Rp)

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

2,872.00
430.80
3,302.80

A.8.4.5.5 Pengetesan 1 m pipa 200 mm

No
A

Uraian
TENAGA
Pekerja
Mandor

Kode

L.01
L.04

BAHAN
Air test (air bersih)
Bahan bakar
Oli

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH

0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA

400.00
60.00
460.00

m3
liter
liter

0.031
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN

3,100.00
552.00
60.00
3,712.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

4,172.00
625.80
4,797.80

15% x D

A.8.4.5.6 Pengetesan 1 m pipa 250 mm

No
A

Uraian
TENAGA
Pekerja
Mandor

Kode

L.01
L.04

BAHAN
Air test (air bersih)
Bahan bakar
Oli

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH

0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA

400.00
60.00
460.00

m3
liter
liter

0.049
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN

4,900.00
552.00
60.00
5,512.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

5,972.00
895.80
6,867.80

15% x D

A.8.4.5.7 Pengetesan 1 m pipa 300 mm

No
A

Uraian
TENAGA
Pekerja
Mandor
BAHAN
Air test (air bersih)
Bahan bakar
Oli
PERALATAN

Kode

L.01
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH

0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA

400.00
60.00
460.00

m3
liter
liter

0.071
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN

7,100.00
552.00
60.00
7,712.00

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

8,172.00
1,225.80
9,397.80

15% x D

A.8.4.5.8 Pengetesan 1 m pipa 400 mm

No
A

Uraian
TENAGA
Pekerja
Mandor
BAHAN
Air test (air bersih)
Bahan bakar
Oli

Kode

L.01
L.04

Satua Koefisie
n
n

Harga
Satuan
(Rp)

Jumlah
Harga
(Rp)

OH
OH

0.008
50,000.00
0.0008
75,000.00
JUMLAH TENAGA KERJA

400.00
60.00
460.00

m3
liter
liter

0.126
100,000.00
0.060
9,200.00
0.002
30,000.00
JUMLAH HARGA BAHAN

12,600.00
552.00
60.00
13,212.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead + Profit 15%
Harga Satuan Pekerjaan (D+E)

15% x D

Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya

SUKAHAR, ST, MT
NIP 19601103 198103 1 006

13,672.00
2,050.80
15,722.80

DAFTAR HARGA SATUAN PEKERJAAN


KEGIATAN
PEKERJAAN
LOKASI
TA

No

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015
Satua
n

Harga
Satuan
(Rp.)

Pembuatan 1 m2 steger/perancah dari bambu


Pembongkaran 1 m3 beton bertulang
Pembongkaran 1 m3 dinding tembok bata
Pemasangan 1 m2 panel beton pracetak 5 x 50 x 213 cm

m2
m2
m2
m3
m3
m2

257,004.07
168,450.21
59,225.00
412,073.75
386,198.75
#VALUE!

PEKERJAAN TANAH
Penggalian 1 m3 tanah biasa sedalam 1 m
Penggalian 1 m3 tanah biasa sedalam 2 m
Penggalian 1 m3 tanah biasa sedalam 3 m
Penggalian 1 m3 tanah keras sedalam 1 m
Penggalian 1 m3 tanah lumpur sedalam 1 m
Pembuangan 1 m3 tanah sejauh 30 meter
Pembuangan 1 m3 tanah sejauh 100 meter
Pembuangan 1 m3 tanah sejauh 200 meter
Pengurugan kembali 1 m3 galian tanah
Pemadatan tanah 1 m3 tanah ( per 20 cm)
Pengurugan 1 m3 dengan pasir urug
Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan
Pengurugan 1 m3 sirtu

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

45,281.25
55,631.25
66,153.75
60,260.00
72,881.25
19,837.50
36,590.91
57,500.00
16,531.25
33,062.50
200,824.50
285,918.75
186,133.25

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

805,052.90
794,454.50
762,846.98
752,248.58
733,166.75
722,568.35
692,503.78
681,905.38
391,904.82
2,234,146.86
809,754.56

Memasang Dinding Conblock HB20 camp. 1 PS : 4PP


Memasang Dinding Conblock HB15 camp. 1 PS : 4PP
Memasang Dinding Conblock HB10 camp. 1 PS : 4PP

m2
m2
m2
m2
m2
m2
m2
m2
m2

289,317.35
272,776.09
270,034.49
140,026.30
132,846.28
131,228.46
250,551.19
196,625.39
145,231.66

PEKERJAAN PLESTERAN
Pemasangan 1m plesteran 1 PC :3 PP tebal 15 mm

m2

49,513.14

Kode

Uraian Pekerjaan
PEKERJAAN PERSIAPAN

A.2.2.1.2
A.2.2.1.2a.
A.2.2.1.10
A.2.2.1.13
A.2.2.1.14
A.2.2.1.16

A.2.3.1.1
A.2.3.1.2
A.2.3.1.3
A.2.3.1.4
A.2.3.1.6
A.2.3.1.8
A.2.3.1.8a.
A.2.3.1.8b.
A.2.3.1.9
A.2.3.1.10
A.2.3.1.11
A.2.3.1.13
A.2.3.1.14

A.3.2.1.2
A.3.2.1.2a
A.3.2.1.3
A.3.2.1.3a
A.3.2.1.4
A.3.2.1.4a
A.3.2.1.5
A.3.2.1.5a
A.3.2.1.9
A.3.2.1.10
A.3.2.1.11

Pembuatan 1 m2 Pagar Sementara dari Seng Gelombang Tinggi 2,


Pembuatan 1 m1 Pagar Sementara dari Seng Gelombang Tinggi 2,

PEKERJAAN PONDASI
Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP
Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 4PP

Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 5PP


Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 5PP

Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 6PP


Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 6PP

Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 8PP


Pemasangan 1 m3 Pondasi Batu Belah campuran 1SP : 8PP

Pemasangan 1 m3 batu kosong (anstamping)


Pemasangan 1 m3 pondasi siklop, 60% beton campu

Pemasangan 1 m3 pondasi sumuran, diameter 100 cm


PEKERJAAN DINDING

A.4.4.1.2
A.4.4.1.4
A.4.4.1.5
A.4.4.1.8
A.4.4.1.10
A.4.4.1.11
A.4.4.1.17
A.4.4.1.19
A.4.4.1.21

A.4.4.2.3

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1


Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1
Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2


Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2
Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2

A.4.4.2.5
A.4.4.2.6
A.4.4.2.20
A.4.4.2.20a.
A.4.4.2.23
A.4.4.2.24
A.4.4.2.26
A.4.4.2.27

Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan

1m
1m
1m
1m
1m
1m

plesteran 1 PC :5 PP tebal 15 mm
plesteran 1 PC :6 PP tebal 15 mm
plesteran skoning 1 SP :3 PP lebar 10 cm
plesteran skoning 1 SP :3 PP lebar 10 mm
plesteran ciprat 1 SP :2 PP
finishing siar pasangan bata merah

Pemasangan 1m finishing siar pasangan batu kali, campuran 1 SP

Pemasangan 1m acian

m2
m2
m2
m2
m2
m2
m2
m2

45,588.07
44,445.32
43,824.09
11,739.09
36,000.52
21,403.80
45,033.54
26,881.25

PEKERJAAN BETON
A.4.1.1.1
A.4.1.1.2
A.4.1.1.4
A.4.1.1.5
A.4.1.1.7
A.4.1.1.8
A.4.1.1.17
A.4.1.1.17a
A.4.1.1.17b.
A.4.1.1.17c.
A.4.1.1.19
A.4.1.1.20
A.4.1.1.20a.
A.4.1.1.21
A.4.1.1.21a.
A.4.1.1.22
A.4.1.1.22a.
A.4.1.1.22b.
A.4.1.1.22c.
A.4.1.1.23
A.4.1.1.23a.
A.4.1.1.23b.
A.4.1.1.23c.
A.4.1.1.24
A.4.1.1.24a.
A.4.1.1.24b.
A.4.1.1.25
A.4.1.1.25a.
A.4.1.1.25b.
A.4.1.1.25c.
A.4.1.1.26
A.4.1.1.26a.
A.4.1.1.27a.

m3
841,934.21
m3
887,903.94
m3
779,004.13
Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100)
m3
966,789.01
Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (122)cm,
m3 1,038,049.25
Membuat 1 m3 Beton mutu f'c=19,3 MPa (K225), slum (122)cm,
m3 1,058,493.20
Membuat 1 m3 Beton mutu f'c=21,7 MPa (K250), slum (122)cm,
Pembesian 10 kg dengan besi polos atau besi ulir
10 kg 123,216.75
Pembesian dengan besi polos atau besi ulir
kg
12,321.68
Pembesian 1 kg dengan besi polos
kg
12,321.68
Pembesian 1 kg dengan besi ulir
kg
12,502.80
Pembesian 10 kg jaring kawat baja (wiremesh)
10 kg #VALUE!
Pemasangan 1 m2 bekisting untuk pondasi
m2
189,331.40
Pemasangan 1 m2 bekisting untuk pondasi (papan kayu lokal)
m2
131,675.00
Pemasangan 1 m2 bekisting untuk sloof
m2
204,985.20
Pemasangan 1 m2 bekisting untuk sloof (2x Pakai)
m2
134,543.10
Pemasangan 1 m2 bekisting untuk kolom
m2
379,437.90
Pemasangan 1 m2 bekisting untuk kolom
m2
208,685.90
Pemasangan 1 m2 bekisting untuk kolom (2x pakai)
m2
146,070.70
m2
172,338.14
Pemasangan 1 m2 bekisting untuk kolom (kolom ekspose t
Pemasangan 1 m2 bekisting untuk balok
m2
321,557.25
Pemasangan 1 m2 bekisting untuk balok
m2
208,685.90
Pemasangan 1 m2 bekisting untuk balok (2x pakai)
m2
157,926.63
m2
198,895.38
Pemasangan 1 m2 bekisting untuk balok (balok gantung ti
Pemasangan 1 m2 bekisting untuk lantai
m2
208,685.90
Pemasangan 1 m2 bekisting untuk lantai (papan cetak kayu pinus) m2
360,862.53
Pemasangan 1 m2 bekisting untuk lantai (papan cetak kayu lokal)
m2
303,206.13
Pemasangan 1 m2 bekisting untuk dinding
m2
338,769.30
Pemasangan 1 m2 bekisting untuk dinding
m2
309,979.05
m2
243,736.75
Pemasangan 1 m2 bekisting untuk dinding 1 sisi (papan cetak kayu
m2
452,369.75
Pemasangan 1 m2 bekisting untuk dinding 2 sisi (papan cetak kayu
Pemasangan 1 m2 bekisting untuk tangga
m2
346,980.30
Pemasangan 1 m2 bekisting untuk tangga
m2
262,854.93
m2
79,535.84
Pemasangan 1 m2 bekisting untuk plat penutup saluran (papan c
Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w
Membuat 1 m3 Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w

PEKERJAAN BETON PRACETAK


A.4.1.1.5
A.4.1.2.6
A.4.1.2.7
A.4.1.2.8
A.4.1.2.9
A.4.1.2.10
A.4.1.2.11
A.4.1.2.12
A.4.1.2.13
A.4.1.2.14
A.4.1.2.15
A.4.1.2.16
A.4.1.2.17
A.4.1.2.18

Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai

Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali


Pembuatan 1 m2 bekisting untuk kolom beton pracetak ( 10-12 kali
Pemasangan dan membuka bekisting 1 buah komponen plat beton
Pemasangan dan membuka begisting 1 buah komponen balok be
Pemasangan dan membuka begisting 1 buah komponen kolom b

Penuangan/menebar beton untuk 1 buah komponen plat pracetak


Penuangan/menebar beton untuk 1 buah komponen balok pracetak
Penuangan/menebar beton untuk 1 buah komponen kolom praceta

Mendirikan 1 buah komponen plat pracetak


Mendirikan 1 buah komponen balok pracetak
Mendirikan 1 buah komponen kolom pracetak
Melangsir 1 buah komponen plat pracetak ( 20 m )
Melangsir 1 buah komponen balok pracetak ( 20 m )

m2
m2
m2
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

966,789.01
#VALUE!
#VALUE!
4,927.75
7,963.75
6,445.75
42,854.75
44,045.00
39,617.50
#VALUE!
#VALUE!
#VALUE!
35,018.16
35,018.16

A.4.1.2.19
A.4.1.2.20
A.4.1.2.21
A.4.1.2.22
A.4.1.2.23
A.4.1.2.24

A.4.4.3.9
A.4.4.3.10
A.4.4.3.24
A.4.4.3.25
A.4.4.3.35
A.4.4.3.35a.
A.4.4.3.35b.
A.4.4.3.35c.
A.4.4.3.36
A.4.4.3.39
A.4.4.3.41
A.4.4.3.43
A.4.4.3.44
A.4.4.3.45
A.4.4.3.46
A.4.4.3.51
A.4.4.3.53
A.4.4.3.54
A.4.4.3.54a.
A.4.4.3.58
A.4.4.3.60
A.4.4.3.61

Melangsir 1 buah komponen kolom pracetak ( 20 m )


Bahan 1 m3 grouting campuran
Bahan 1 m3 grouting tidak campuran
Upah melakukan 1 titik grouting pada join pracetak
Pemasangan 1 titik bekisting join pracetak
Upah 1 titik Join dengan Sling
PEKERJAAN
Pemasangan
Pemasangan
Pemasangan
Pemasangan

PENUTUP LANTAI DAN DINDING


1m lantai ubin granit ukuran 40cm x 40cm
1m lantai ubin granit ukuran 30cm x 30cm
1m plint ubin granit ukuran 10cm x 40cm
1m plint ubin granit ukuran 10cm x 30cm

Pemasangan 1m lantai keramik ukuran 30cm x 30cm (putih polos)


Pemasangan 1m lantai keramik ukuran 40cm x 40cm (putih polos)

Pemasangan 1m lantai keramik ukuran 30cm x 30cm (warna)


Pemasangan 1m lantai keramik ukuran 40cm x 40cm (warna)
Pemasangan 1m lantai keramik ukuran 20cm x 20cm (anti slip)
Pemasangan 1m plint keramik ukuran 10cm x 20cm
Pemasangan 1m plint keramik ukuran 5 cm x 20cm
Pemasangan 1m lantai marmer ukuran 100 cm x 100 cm
Pemasangan 1m lantai karpet
Pemasangan 1m underlayer (pelapis bawah karpet)
Pemasangan 1m lantai parquet kayu
Pemasangan 1m dinding keramik artistik 10 cm x 20 cm
Pemasangan 1m dinding keramik 10 cm x 20 cm
Pemasangan 1m dinding keramik 20 cm x 20 cm
Pemasangan 1m dinding keramik 20 cm x 25 cm
Pemasangan 1m dinding batu tempel hitam
Pemasangan 1m wallpaper lebar 50 cm
Pemasangan 1m floor hardener

buah
35,018.16
m3 #VALUE!
m3 #VALUE!
titik
39,117.25
titik
99,750.08
titik
57,557.50

m2
m2
m1
m1
m2
m2
m2
m2
m2
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

270,353.50
212,186.34
29,813.64
32,033.71
163,934.23
170,205.18
167,781.18
175,288.18
171,436.83
48,923.76
33,921.95
#VALUE!
53,314.00
#VALUE!
#VALUE!
#VALUE!
189,375.56
185,709.36
186,745.51
252,902.83
206,407.75
#VALUE!

m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2

15,686,506.0
0
10,952,312.5
0
16,569,464.5
0
16,467,758.5
0
10,786,712.5
0
836,401.90
836,401.90
886,937.50
630,487.50
567,678.64
567,678.64
598,000.00
444,130.00
9,777,990.00
14,927,046.0
0
14,443,816.0
0
9,777,990.00
17,027,998.2
5
16,500,838.2
5
11,410,846.2
5
14,337,556.0
0
13,854,326.0
0
9,188,500.00
389,556.75
190,312.01
149,740.01
143,691.24

PEKERJAAN KAYU
A.4.6.1.1
A.4.6.1.2
A.4.6.1.2a.
A.4.6.1.2b.
A.4.6.1.2c.
A.4.6.1.5
A.4.6.1.5a.
A.4.6.1.5b.
A.4.6.1.5c.
A.4.6.1.6
A.4.6.1.6a.
A.4.6.1.6b.
A.4.6.1.6c.
A.4.6.1.13
A.4.6.1.13a.
A.4.6.1.13b.
A.4.6.1.13c.
A.4.6.1.14a.
A.4.6.1.14b.
A.4.6.1.14c.
A.4.6.1.15a.
A.4.6.1.15b.
A.4.6.1.15c.
A.4.6.1.16
A.4.6.1.16a.
A.4.6.1.16b.
A.4.6.1.16c.

Pembuatan dan Pemasangan 1 m kusen pintu dan kusen jendela,


Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendel
Pembuatan dan pemasangan 1 m kusen pintu dan kusen jend

Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendel

Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela

Pembuatan dan pemasangan 1 m daun pintu panel, kayu kelas I &


Pembuatan dan pemasangan 1 m daun pintu panel, kayu jati (pe

Pembuatan dan pemasangan 1 m daun pintu panel, kayu bengkira

Pembuatan dan pemasangan 1 m daun pintu panel, kayu kruing


Pembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu kela
Pembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu jat

Pembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu ben

Pembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu kru


Pembuatan dan pemasangan 1 m Konstruks

Pembuatan dan pemasangan 1 m Konstruksi Kuda-kuda


Pembuatan dan pemasangan 1 m Konstruksi Kud

Pembuatan dan pemasangan 1 m Konstruksi Kuda-

Pemasangan
Pemasangan
Pemasangan
Pemasangan

1
1
1
1

m
m
m
m

Konstruksi
Konstruksi
Konstruksi
Konstruksi

Kuda-kuda ekspos Kayu jati


Kuda-kuda ekspos Kayu Bengkirai
Kuda-kuda ekspos Kayu Kruing
Nok, Gording, Murplat Kayu Jati

Pemasangan 1 m Konstruksi Nok, Gording, Murplat Kayu Bengkirai

Pemasangan 1 m Konstruksi Nok, Gording, Murplat Kayu Kruing


Pemasangan 1 m rangka atap genteng keramik, kayu kelas II
Pemasangan 1 m rangka atap genteng keramik/morando, kayu b

Pemasangan 1 m rangka atap genteng keramik/morando, kayu kr


Pemasangan 1 m rangka atap genteng keramik/morando, kayu k

A.4.6.1.16d.
A.4.6.1.16e.
A.4.6.1.16f.
A.4.6.1.17
A.4.6.1.17a.
A.4.6.1.17b.
A.4.6.1.17c.
A.4.6.1.19a.
A.4.6.1.19b.
A.4.6.1.20
A.4.6.1.20a.
A.4.6.1.20b.
A.4.6.1.21
A.4.6.1.21a.
A.4.6.1.21b.
A.4.6.1.23
A.4.6.1.23a.
A.4.6.1.23b.

A.4.2.1.1
A.4.2.1.1a.
A.4.2.1.1b.
A.4.2.1.2
A.4.2.1.2a.
A.4.2.1.3
A.4.2.1.3a.
A.4.2.1.4
A.4.2.1.5
A.4.2.1.5a.
A.4.2.1.7
A.4.2.1.8
A.4.2.1.10
A.4.2.1.11
A.4.2.1.11a.
A.4.2.1.11b.
A.4.2.1.12
A.4.2.1.13
A.4.2.1.18
A.4.2.1.18a.
A.4.2.1.18b.
A.4.2.1.20
A.4.2.1.21

Pemasangan 1 m rangka atap genteng press, kayu bengkirai


Pemasangan 1 m rangka atap genteng press, kayu kruing
Pemasangan 1 m rangka atap genteng press, kayu kempas
Pemasangan 1 m rangka atap genteng beton, kayu kelas II
Pemasangan 1 m rangka atap genteng beton, kayu bengkirai
Pemasangan 1 m rangka atap genteng beton, kayu kruing
Pemasangan 1 m rangka atap genteng beton, kayu kempas
Pemasangan 1 m rangka langit-langit (50 x 100), kayu kruing
Pemasangan 1 m rangka langit-langit (50 x 100), kayu kempas
Pemasangan 1 m rangka langit-langit (60 x 60), kayu kelas II atau

Pemasangan 1 m rangka langit-langit (60 x 60), kayu kruing


Pemasangan 1 m rangka langit-langit (60 x 60), kayu kempas
Pemasangan 1 m lisplank ukuran (3 x 20 ), kayu kelas I atau kelas

Pemasangan 1 m' lisplank ukuran (3 x 20 ), kayu bengkirai


Pemasangan 1 m' lisplank ukuran (3 x 20 ), kayu kruing
Pemasangan 1 m rangka dinding pemisah (60 x 60 ) cm, kayu kela

Pemasangan 1 m rangka dinding pemisah (60 x 120 ) cm, kayu be


Pemasangan 1 m rangka dinding pemisah (60 x 120 ) cm, kayu kr

PEKERJAAN BESI & ALUMUNIUM


Pemasangan 1 kg besi profil
Pemasangan 1 kg besi profil
Pemasangan 1 kg besi kanal CNP
Pemasangan 1 Kg rangka kuda-kuda baja IWF
Pemasangan 1 Kg rangka kuda-kuda baja IWF
Pengerjaan 100 Kg pekerjaan perakitan
Pengerjaan 1 Kg pekerjaan perakitan
Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka

Pengerjaan 10 cm pengelasan dengan las listrik


Pengerjaan 1 cm pengelasan dengan las listrik
Pemasangan 1 m2 pintu rolling door besi
Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
Pemasangan 1 m2 rolling door alumunium
Pemasangan 1 m kusen pintu alumunium
Pemasangan 1 m kusen pintu alumunium ukuran 4 inch (silver)
Pemasangan 1 m kusen pintu alumunium ukuran 4 inch (brown)
Pemasangan 1 m2 pintu alumunium strip lebar 8 cm
Pemasangan 1 m2 pintu kaca rangka alumunium
Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm
Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm (pap
Pemasangan 1 m' talang datar/jurai seng bjls 28 lebar 90 cm (pa
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x60

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m2
m2

163,767.88
113,615.40
104,033.11
536,751.00
190,312.01
149,740.01
143,691.24
129,923.55
123,269.90
133,168.85
133,168.85
126,126.35
176,865.08
126,632.80
85,701.45
257,134.25
#VALUE!
#VALUE!

Kg
Kg
Kg
Kg
Kg
100 Kg
Kg
m2
10 cm
cm
m2
m2
m2
m1
m1
m1
m2
m2
m1
m1
m1
m2
m2

22,082.88
23,745.78
23,944.15
24,265.00
25,927.90
51,277.84
512.78
#VALUE!
27,481.70
2,748.17
#VALUE!
#VALUE!
438,437.50
135,585.00
135,585.00
#VALUE!
#VALUE!
#VALUE!
221,311.18
221,311.18
208,201.18
115,460.00
141,651.25

PEKERJAAN PLAFOND
A.4.5.1.1
A.4.5.1.1a.
A.4.5.1.4
A.4.5.1.5
A.4.5.1.6
A.4.5.1.7
A.4.5.1.8
A.4.5.1.9

A.4.5.2.1
A.4.5.2.1a.
A.4.5.2.1b.
A.4.5.2.2

Pemasangan 1 m' List Langit-Langit Kayu Profil

m2
m2
m2
m2
m2
m2
m2
m1

31,941.25
27,893.25
268,231.75
52,310.63
307,735.40
37,277.94
415,283.40
13,374.50

PEKERJAAN
Pemasangan
Pemasangan
Pemasangan
Pemasangan

m1
m1
m1
m2

77,811.88
84,999.38
92,186.88
112,355.00

Pemasangan 1 m2 Langit-langit Asbes (1,00x1,00) m, tebal

Pemasangan 1 m2 Langit-langit Saflex (1,00x1,00) m, tebal 5 mm


Pemasangan 1 m2 Langit-langit Akustik Ukuran (60x120) cm
Memasang 1 m2 Langit-langit Tripleks Uk (120x240) cm, T

Memasang 1 m2 Langit-langit Lambriziring Kayu Jati, tebal 6 mm


Memasang 1 m2 Langit-langit Gypsum Board, Uk (120x240) teba
Memasang 1 m2 Langit-langit Akustik Uk (60x120) cm berik

ATAP
Atap 1 m2
Atap 1 m2
Atap 1 m2
1 m2 Atap

Genteng
Genteng
Genteng
Genteng

Plentong Kecil
Press Jatiwangi
Press Kebumen
Kodok Glasur

A.4.5.2.3
A.4.5.2.4
A.4.5.2.4a.
A.4.5.2.4b.
A.4.5.2.5
A.4.5.2.6
A.4.5.2.8
A.4.5.2.9
A.4.5.2.10
A.4.5.2.11
A.4.5.2.12
A.4.5.2.14
A.4.5.2.30
A.4.5.2.32
A.4.5.2.33
A.4.5.2.34
A.4.5.2.36
A.4.5.2.37
A.4.5.2.38
A.4.5.2.39
A.4.5.2.40
A.4.5.2.41
A.4.5.2.42

A.4.7.1.1
A.4.7.1.3
A.4.7.1.4
A.4.7.1.4a.
A.4.7.1.7
A.4.7.1.9
A.4.7.1.10
A.4.7.1.10a.
A.4.7.1.11
A.4.7.1.16
A.4.7.1.20

A.4.6.2.2
A.4.6.2.3
A.4.6.2.4
A.4.6.2.5
A.4.6.2.6
A.4.6.2.9
A.4.6.2.10
A.4.6.2.12
A.4.6.2.13
A.4.6.2.14
A.4.6.2.16
A.4.6.2.17
A.4.6.2.17a.
A.4.6.2.19
A.4.6.2.20
A.4.6.2.23

A.5.1.1.1
A.5.1.1.2
A.5.1.1.4

Pemasangan 1 m2 Atap Genteng Plentong Super / Besar


Pemasangan 1 m' Genteng Bubung Plentong
Pemasangan 1 m' Genteng Bubung Press Jatiwangi
Pemasangan 1 m' Genteng Bubung Press Kebumen
Pemasangan 1 m' Genteng Bubung Kodok Glasur
Pemasangan 1 m' Genteng Bubung Plentong Besar
Pemasangan 1 m2 Atap Asbes Gelombang (2,50x0,92 m)
Pemasangan 1 m2 Atap Asbes Gelombang (2,25x0,92 m)
Pemasangan 1 m2 Atap Asbes Gelombang (2,00x0,92 m)
Pemasangan 1 m2 Atap Asbes Gelombang (1,80x0,92 m)
Pemasangan 1 m2 Atap Asbes Gelombang (3,00x1,05 m)
Pemasangan 1 m2 Atap Asbes Gelombang (2,40x1,05 m)
Pemasangan 1 m2 Atap Genteng Beton
Pemasangan 1 m2 Atap Genteng Metal
Pemasangan 1 m2 Atap Sirap
Pemasangan 1 m' Nok Genteng Beton
Pemasangan 1 m' Nok Genteng Metal
Pemasangan 1 m' Nok Sirap
Pemasangan 1 m2 Atap Seng Gelombang
Pemasangan 1 m' Nok Seng
Pemasangan 1 m2 Atap Alumunium
Pemasangan 1 m' Nok Alumunium
Pemasangan 1 m2 Alumunium Foil/sisalation

x
x
x
x
x
x

PEKERJAAN PENGECATAN
Pengikisan/pengerokan 1 m2 permukaan cat lama
Pengerokan 1 m2 karat pada permukaan baja cara manual
Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis

Pengecatan 1 m2 bidang kayu lama (1 lapis cat dasar, 1 lapis cat

Pelaburan 1 m2 bidang kayu dengan politur


Pelaburan 1 m2 bidang kayu dengan vernis
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat

Pengecatan 1 m2 tembok baru eksterior (1 lapis cat dasar, 2 la

Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penut

Pengecatan 1 m2 permukaan baja dengan menie besi


Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3

5
5
5
5
4
4

mm
mm
mm
mm
mm
mm

m2
m1
m1
m1
m1
m1
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
m1
m2
m1
m2

61,582.50
83,622.94
88,567.94
88,510.44
86,497.94
82,242.94
74,148.93
78,480.60
70,171.85
71,106.23
51,852.35
42,437.30
76,951.10
81,126.75
85,140.25
92,868.94
#VALUE!
52,342.25
48,416.15
31,339.80
#VALUE!
#VALUE!
#VALUE!

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

9,803.75
9,861.25
41,018.20
32,522.00
45,641.43
31,205.25
19,195.23
26,159.63
13,685.00
22,064.48
117,047.00

PEKERJAAN KUNCI & KACA


Pemasangan 1 buah kunci tanam biasa
Pemasangan 1 buah kunci kamar mandi
Pemasangan 1 buah kunci silinder
Pemasangan 1 buah engsel pintu
Pemasangan 1 buah engsel jendela kupu-kupu
Pemasangan 1 buah kait angin
Pemasangan 1 buah Door Closer
Pemasangan 1 buah Door Holder
Pemasangan 1 buah Door Stop
Pemasangan 1 buah rel pintu sorong
Pemasangan 1 m2 kaca tebal 3 mm
Pemasangan 1 m2 kaca tebal 5 mm
Pemasangan 1 m2 kaca tebal 5 mm
Pemasangan 1 m2 kaca buram tebal 12 mm
Pemasangan 1 m2 kaca cermin tebal 5 mm
Pemasangan 1 m2 kaca patri tebal 5 mm

buah 136,418.75
buah #VALUE!
buah 109,048.75
buah
35,575.25
buah
26,780.63
buah
21,246.25
buah 271,946.25
buah 182,131.25
buah
29,353.75
buah #VALUE!
m2
90,976.50
m2
136,516.50
m2
135,740.25
m2
401,887.63
m2
215,803.25
m2
398,302.50

PEKERJAAN
Pemasangan
Pemasangan
Pemasangan

buah
buah
buah

SANITASI GEDUNG
1 buah closet duduk/monoblock
1 buah closet jongkok porslen
1 buah urinoir

748,502.80
374,937.95
686,357.95

A.5.1.1.5
A.5.1.1.5a.
A.5.1.1.10
A.5.1.1.18
A.5.1.1.19a.
A.5.1.1.19b.
A.5.1.1.20
A.5.1.1.21
A.5.1.1.22
A.5.1.1.23
A.5.1.1.24
A.5.1.1.25
A.5.1.1.26
A.5.1.1.27
A.5.1.1.28
A.5.1.1.29
A.5.1.1.30
A.5.1.1.31
A.5.1.1.32

Pemasangan 1 buah wastafel


Pemasangan 1 buah wastafel
Pemasangan 1 buah bak air fibreglass vol 1 m3
Pemasangan 1 m' pipa galvanis diameter "
Pemasangan 1 buah kran diameter "
Pemasangan 1 buah kran diameter 3/4"
Pemasangan 1 m' pipa galvanis diameter 3/4"
Pemasangan 1 m' pipa galvanis diameter 1"
Pemasangan 1 m' pipa galvanis diameter 1 "
Pemasangan 1 m' pipa galvanis diameter 3"
Pemasangan 1 m' pipa galvanis diameter 4"
Pemasangan 1 m' pipa PVC tipe AW diameter "
Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"
Pemasangan 1 m' pipa PVC tipe AW diameter 1"
Pemasangan 1 m' pipa PVC tipe AW diameter 1 "
Pemasangan 1 m' pipa PVC tipe AW diameter 2"
Pemasangan 1 m' pipa PVC tipe AW diameter 2 "
Pemasangan 1 m' pipa PVC tipe AW diameter 3"
Pemasangan 1 m' pipa PVC tipe AW diameter 4"

BOW.M.15
BOW.M.15a
BOW.M.15b
BOW.M.15c
BOW.M.15d
BOW.M.15e
BOW.M.15f
BOW.G.5b

ANALISA LAINNYA
1 m2 Pasang paving Natural tebal 6 cm K 175
1 m2 Pasang paving warna tebal 6 cm K 175
1 m2 Pasang paving Natural tebal 8 cm K 175
1 m2 Pasang paving warna tebal 8 cm K 175
1 m2 Pasang paving Natural tebal 6 cm (Lokal)
1 m2 Pasang paving warna tebal 6 cm (Lokal)
1 m2 pasang Grass Block tebal 6 cm K 175
1 m3 Pasang Bronjong Kawat 4 mm

m2
m2
m2
m2
m2
m2
m2
m3

130,297.30
141,797.30
147,547.30
156,747.30
118,797.30
122,247.30
#VALUE!
760,955.00

A.8.4.1.1
A.8.4.1.2
A.8.4.1.3
A.8.4.1.4
A.8.4.1.5
A.8.4.1.6
A.8.4.1.7
A.8.4.1.8
A.8.4.1.17
A.8.4.1.18
A.8.4.1.19
A.8.4.1.20
A.8.4.1.21
A.8.4.1.22
A.8.4.1.23
A.8.4.1.24
A.8.4.1.33
A.8.4.1.34
A.8.4.1.35
A.8.4.1.36
A.8.4.1.37
A.8.4.1.38
A.8.4.1.39
A.8.4.1.40

PEKERJAAN
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan

m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1
m1

42,557.31
80,343.00
114,362.44
232,188.13
363,711.01
568,865.95
#VALUE!
#VALUE!
44,338.41
191,751.16
245,381.41
247,089.16
356,454.16
964,469.95
#VALUE!
#VALUE!
247,066.00
580,405.00
#VALUE!
833,560.25
1,271,509.00
#VALUE!
#VALUE!
#VALUE!

m1
m1

4,132,848.15
6,549,287.95

A.8.4.3.1
A.8.4.3.2

PIPA
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa
1 m pipa

PVC 63 mm
PVC 90 mm
PVC 110 mm
PVC 150 mm
PVC 200 mm
PVC 250 mm
PVC 300 mm
PVC 400 mm
HDPE 63 mm
HDPE 100 mm
HDPE 125 mm
HDPE 150 mm
HDPE 200 mm
HDPE 250 mm
HDPE 300 mm
HDPE 400 mm
GIP 63 mm
GIP 100 mm
GIP 125 mm
GIP 150 mm
GIP 200 mm
GIP 250 mm
GIP 300 mm
GIP 400 mm

PEKERJAAN AKSESORIS PIPA


Pemasangan 1 buah Valve 150 mm
Pemasangan 1 buah Valve 200 mm

buah #VALUE!
buah 505,807.95
buah #VALUE!
m1
67,999.50
m1
31,395.66
m1
31,740.66
m1
89,746.00
m1
111,670.75
m1
142,824.25
m1
390,666.50
m1
533,712.13
m1
26,662.75
m1
30,406.00
m1
38,427.25
m1
52,917.25
m1
48,817.50
m1
67,122.63
m1
89,582.13
m1
131,649.13

A.8.4.3.3
A.8.4.3.4
A.8.4.3.5
A.8.4.3.15
A.8.4.3.16
A.8.4.3.17
A.8.4.3.18
A.8.4.3.19

A.8.4.5.1
A.8.4.5.2
A.8.4.5.3
A.8.4.5.4
A.8.4.5.5
A.8.4.5.6
A.8.4.5.7
A.8.4.5.8

Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan
Pemasangan

1
1
1
1
1
1
1
1

buah
buah
buah
buah
buah
buah
buah
buah

Valve 250 mm
Valve 300 mm
Valve 400 mm
Tee 150 mm
Tee 200 mm
Tee 250 mm
Tee 300 mm
Tee 400 mm

m1
m1
m1
m1
m1
m1
m1
m1

PEKERJAAN PENGETESAN PIPA


Pengetesan 1 m pipa 50 mm
Pengetesan 1 m pipa 75 mm
Pengetesan 1 m pipa 100 mm
Pengetesan 1 m pipa 150 mm
Pengetesan 1 m pipa 200 mm
Pengetesan 1 m pipa 250 mm
Pengetesan 1 m pipa 300 mm
Pengetesan 1 m pipa 400 mm

m1
m1
m1
m1
m1
m1
m1
m1

9,766,304.85
#VALUE!
#VALUE!
902,525.38
2,076,164.85
1,470,328.29
#VALUE!
#VALUE!

1,462.80
1,692.80
2,152.80
3,302.80
4,797.80
6,867.80
9,397.80
15,722.80

PEKERJAAN JALAN
K. 637a
K. 618a
K. 615a
K. 617a
K. 516
K. 210
K. 621b
K. T04

Propelering (lapis perata) Penetrasi Makadam (menggunakan buruh

Lapis Penetrasi Makadam 5 cm (Lapen) (menggunakan buruh)


Laburan Aspal Satu Lapis (burtu) (menggunakan buruh)
Laburan Aspal Dua Lapis (burda) (menggunakan buruh)
Konstruksi Lapis Pondasi Atas (Telford) (menggunakan buruh)
Pengupasan Tanah dan Pembersihan Semak Damija (menggunakan
Membuat Campuran, Menghampar dan Memadatkan Latasir

Pelapisan Prime Coat (menggunakan buruh)

M3
M2
M2
M2
M3
M2
M2
M2

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya

SUKAHAR, ST, MT
NIP 19601103 198103 1 006

ENGINEER ESTIMATE (EE)


Harga Perkiraan Perencana (HPP)
KEGIATAN
PEKERJAAN
LOKASI
TA
N
O
I
1
2
3
4
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
IV

URAIAN PEKERJAAN

: XXXXX
: XXXXXXXXXXX
: XXXXXXXXXXXXX
: 2015

ANALISA

PEKERJAAN PERSIAPAN
Pas. Papan Nama Kegiatan
Pembersihan Lapangan
Pengukuran + pas. patok/pro
PEKERJAAN A
AAA1
AAA2
AAA3
AAA4
AAA5
AAA6
AAA7
AAA8
AAA9
AAA10
AAA11
AAA12
AAA13
AAA14
AAA15
AAA16
AAA17
AAA18
AAA19
AAA20
PEKERJAAN B
BBB1
BBB2
BBB3
BBB4
BBB5
BBB6
BBB7
BBB8
BBB9
BBB10
BBB11
BBB12
BBB13
BBB14
BBB15
BBB16
BBB17
BBB18
BBB19
BBB20
PEKERJAAN C

VOLUME

Ls
Ls
Ls

X1
X2
X3

HARGA
SATUAN
(Rp)

JUMLAH
HARGA (Rp)

JUMLAH
TOTAL (Rp)

AA1
AA2
AA3
AA4
AA5
AA6
AA7
AA8
AA9
AA10
AA11
AA12
AA13
AA14
AA15
AA16
AA17
AA18
AA19
AA20

A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13
A14
A15
A16
A17
A18
A19
A20

BB1
BB2
BB3
BB4
BB5
BB6
BB7
BB8
BB9
BB10
BB11
BB12
BB13
BB14
BB15
BB16
BB17
BB18
BB19
BB20

B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12
B13
B14
B15
B16
B17
B18
B19
B20

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
V
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

CCC1
CCC2
CCC3
CCC4
CCC5
CCC6
CCC7
CCC8
CCC9
CCC10
CCC11
CCC12
CCC13
CCC14
CCC15
CCC16
CCC17
CCC18
CCC19
CCC20
PEKERJAAN D
DDD1
DDD2
DDD3
DDD4
DDD5
DDD6
DDD7
DDD8
DDD9
DDD10
DDD11
DDD12
DDD13
DDD14
DDD15
DDD16
DDD17
DDD18
DDD19
DDD20
PEKERJAAN E
EEE1
EEE2
EEE3
EEE4
EEE5
EEE6
EEE7
EEE8
EEE9
EEE10
EEE11
EEE12
EEE13
EEE14
EEE15
EEE16
EEE17

CC1
CC2
CC3
CC4
CC5
CC6
CC7
CC8
CC9
CC10
CC11
CC12
CC13
CC14
CC15
CC16
CC17
CC18
CC19
CC20

C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18
C19
C20

DD1
DD2
DD3
DD4
DD5
DD6
DD7
DD8
DD9
DD10
DD11
DD12
DD13
DD14
DD15
DD16
DD17
DD18
DD19
DD20

D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20

EE1
EE2
EE3
EE4
EE5
EE6
EE7
EE8
EE9
EE10
EE11
EE12
EE13
EE14
EE15
EE16
EE17

E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12
E13
E14
E15
E16
E17

18 EEE18
19 EEE19
20 EEE20
VII PEKERJAAN F
1 FFF1
2 FFF2
3 FFF3
4 FFF4
5 FFF5
6 FFF6
7 FFF7
8 FFF8
9 FFF9
10 FFF10
11 FFF11
12 FFF12
13 FFF13
14 FFF14
15 FFF15
16 FFF16
17 FFF17
18 FFF18
19 FFF19
20 FFF20
BOUWSOME
PPn 10%
AANIMINGSOME
JUMLAH DIBULATKAN
TERBILANG

EE18
EE19
EE20

E18
E19
E20

FF1
FF2
FF3
FF4
FF5
FF6
FF7
FF8
FF9
FF10
FF11
FF12
FF13
FF14
FF15
FF16
FF17
FF18
FF19
FF20

F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19
F20

#
Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya

SUKAHAR, ST, MT
NIP 19601103 198103 1 006

REKAPITULASI PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA
N
O

: XXXXX
: XXXXXXXXXXX
: XXXXXXXXXXXXX
: 2015

URAIAN PEKERJAAN

JUMLAH TOTAL (Rp)

I PEKERJAAN PERSIAPAN

II PEKERJAAN A

III PEKERJAAN B

IV PEKERJAAN C

V PEKERJAAN D

VI PEKERJAAN E

VII PEKERJAAN F

BOUWSOME
PPn 10%
AANIMINGSOME
JUMLAH DIBULATKAN
TERBILANG

#
Slawi,
2015
An. Kepala DPU Kab. Tegal
Kepala Bidang Cipta Karya

SUKAHAR, ST, MT
NIP 19601103 198103 1 006

BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

PEKERJAAN A
VOLUME
SAT
- A1
- A2
- A3
- A4
- A5
- A6
- A7
- A8
- A9
- A10
- A11
- A12
- A13
- A14
- A15
- A16
- A17
- A18
- A19
- A20
PERHITUNGAN VOLUME PEKERJAAN
AAA1

ITEM PEKERJAAN
AAA1
AAA2
AAA3
AAA4
AAA5
AAA6
AAA7
AAA8
AAA9
AAA10
AAA11
AAA12
AAA13
AAA14
AAA15
AAA16
AAA17
AAA18
AAA19
AAA20

URAIAN

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A1

JUMLAH

AAA2
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A2

JUMLAH

AAA3
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A3

JUMLAH

AAA4
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A4

JUMLAH

AAA5
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A5

JUMLAH

AAA6
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A6

JUMLAH

AAA7
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A7

JUMLAH

AAA8
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A8

JUMLAH

AAA9
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A9

JUMLAH

AAA10
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A10

JUMLAH

AAA11
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A11

JUMLAH

AAA12
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A12

JUMLAH

AAA13
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A13

JUMLAH

AAA14
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A14

JUMLAH

AAA15
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A15

JUMLAH

AAA16
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A16

JUMLAH

AAA17
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A17

JUMLAH

AAA18
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A18

JUMLAH

JUMLAH

VOLUME

AAA19
URAIAN

PANJANG

LEBAR

TINGGI

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A19

JUMLAH

AAA20
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

A20

JUMLAH

BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

PEKERJAAN B
VOLUME
SAT
- B1
- B2
- B3
- B4
- B5
- B6
- B7
- B8
- B9
- B10
- B11
- B12
- B13
- B14
- B15
- B16
- B17
- B18
- B19
- B20
PERHITUNGAN VOLUME PEKERJAAN
BBB1

ITEM PEKERJAAN
BBB1
BBB2
BBB3
BBB4
BBB5
BBB6
BBB7
BBB8
BBB9
BBB10
BBB11
BBB12
BBB13
BBB14
BBB15
BBB16
BBB17
BBB18
BBB19
BBB20

URAIAN

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B1

JUMLAH

BBB2
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B2

JUMLAH

BBB3
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B3

JUMLAH

BBB4
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B4

JUMLAH

BBB5
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B5

JUMLAH

BBB6
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B6

JUMLAH

BBB7
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B7

JUMLAH

BBB8
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B8

JUMLAH

BBB9
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B9

JUMLAH

BBB10
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B10

JUMLAH

BBB11
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B11

JUMLAH

BBB12
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B12

JUMLAH

BBB13
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B13

JUMLAH

BBB14
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B14

JUMLAH

BBB15
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B15

JUMLAH

BBB16
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B16

JUMLAH

BBB17
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B17

JUMLAH

BBB18
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B18

JUMLAH

JUMLAH

VOLUME

BBB19
URAIAN

PANJANG

LEBAR

TINGGI

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B19

JUMLAH

BBB20
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

B20

JUMLAH

BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

PEKERJAAN C
VOLUME
SAT
- C1
- C2
- C3
- C4
- C5
- C6
- C7
- C8
- C9
- C10
- C11
- C12
- C13
- C14
- C15
- C16
- C17
- C18
- C19
- C20
PERHITUNGAN VOLUME PEKERJAAN
CCC1

ITEM PEKERJAAN
CCC1
CCC2
CCC3
CCC4
CCC5
CCC6
CCC7
CCC8
CCC9
CCC10
CCC11
CCC12
CCC13
CCC14
CCC15
CCC16
CCC17
CCC18
CCC19
CCC20

URAIAN

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C1

JUMLAH

CCC2
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C2

JUMLAH

CCC3
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C3

JUMLAH

CCC4
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C4

JUMLAH

CCC5
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C5

JUMLAH

CCC6
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C6

JUMLAH

CCC7
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C7

JUMLAH

CCC8
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C8

JUMLAH

CCC9
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C9

JUMLAH

CCC10
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C10

JUMLAH

CCC11
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C11

JUMLAH

CCC12
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C12

JUMLAH

CCC13
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C13

JUMLAH

CCC14
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C14

JUMLAH

CCC15
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C15

JUMLAH

CCC16
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C16

JUMLAH

CCC17
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C17

JUMLAH

CCC18
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C18

JUMLAH

JUMLAH

VOLUME

CCC19
URAIAN

PANJANG

LEBAR

TINGGI

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C19

JUMLAH

CCC20
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

C20

JUMLAH

BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

PEKERJAAN D
VOLUME
SAT
- D1
- D2
- D3
- D4
- D5
- D6
- D7
- D8
- D9
- D10
- D11
- D12
- D13
- D14
- D15
- D16
- D17
- D18
- D19
- D20
PERHITUNGAN VOLUME PEKERJAAN
DDD1

ITEM PEKERJAAN
DDD1
DDD2
DDD3
DDD4
DDD5
DDD6
DDD7
DDD8
DDD9
DDD10
DDD11
DDD12
DDD13
DDD14
DDD15
DDD16
DDD17
DDD18
DDD19
DDD20

URAIAN

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D1

JUMLAH

DDD2
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D2

JUMLAH

DDD3
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D3

JUMLAH

DDD4
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D4

JUMLAH

DDD5
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D5

JUMLAH

DDD6
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D6

JUMLAH

DDD7
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D7

JUMLAH

DDD8
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D8

JUMLAH

DDD9
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D9

JUMLAH

DDD10
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D10

JUMLAH

DDD11
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D11

JUMLAH

DDD12
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D12

JUMLAH

DDD13
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D13

JUMLAH

DDD14
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D14

JUMLAH

DDD15
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D15

JUMLAH

DDD16
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D16

JUMLAH

DDD17
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D17

JUMLAH

DDD18
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D18

JUMLAH

JUMLAH

VOLUME

DDD19
URAIAN

PANJANG

LEBAR

TINGGI

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D19

JUMLAH

DDD20
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

D20

JUMLAH

BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

PEKERJAAN E
VOLUME
SAT
- E1
- E2
- E3
- E4
- E5
- E6
- E7
- E8
- E9
- E10
- E11
- E12
- E13
- E14
- E15
- E16
- E17
- E18
- E19
- E20
PERHITUNGAN VOLUME PEKERJAAN
EEE1

ITEM PEKERJAAN
EEE1
EEE2
EEE3
EEE4
EEE5
EEE6
EEE7
EEE8
EEE9
EEE10
EEE11
EEE12
EEE13
EEE14
EEE15
EEE16
EEE17
EEE18
EEE19
EEE20

URAIAN

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E1

JUMLAH

EEE2
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E2

JUMLAH

EEE3
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E3

JUMLAH

EEE4
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E4

JUMLAH

EEE5
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E5

JUMLAH

EEE6
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E6

JUMLAH

EEE7
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E7

JUMLAH

EEE8
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E8

JUMLAH

EEE9
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E9

JUMLAH

EEE10
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E10

JUMLAH

EEE11
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E11

JUMLAH

EEE12
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E12

JUMLAH

EEE13
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E13

JUMLAH

EEE14
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E14

JUMLAH

EEE15
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E15

JUMLAH

EEE16
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E16

JUMLAH

EEE17
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E17

JUMLAH

EEE18
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E18

JUMLAH

JUMLAH

VOLUME

EEE19
URAIAN

PANJANG

LEBAR

TINGGI

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E19

JUMLAH

EEE20
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

E20

JUMLAH

BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI
TA

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

:
:
:
:

XXXXX
XXXXXXXXXXX
XXXXXXXXXXXXX
2015

PEKERJAAN F
VOLUME
SAT
- F1
- F2
- F3
- F4
- F5
- F6
- F7
- F8
- F9
- F10
- F11
- F12
- F13
- F14
- F15
- F16
- F17
- F18
- F19
- F20
PERHITUNGAN VOLUME PEKERJAAN
FFF1

ITEM PEKERJAAN
FFF1
FFF2
FFF3
FFF4
FFF5
FFF6
FFF7
FFF8
FFF9
FFF10
FFF11
FFF12
FFF13
FFF14
FFF15
FFF16
FFF17
FFF18
FFF19
FFF20

URAIAN

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F1

JUMLAH

FFF2
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F2

JUMLAH

FFF3
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F3

JUMLAH

FFF4
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F4

JUMLAH

FFF5
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F5

JUMLAH

FFF6
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F6

JUMLAH

FFF7
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F7

JUMLAH

FFF8
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F8

JUMLAH

FFF9
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F9

JUMLAH

FFF10
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F10

JUMLAH

FFF11
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F11

JUMLAH

FFF12
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F12

JUMLAH

FFF13
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F13

JUMLAH

FFF14
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F14

JUMLAH

FFF15
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F15

JUMLAH

FFF16
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F16

JUMLAH

FFF17
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F17

JUMLAH

FFF18
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F18

JUMLAH

JUMLAH

VOLUME

FFF19
URAIAN

PANJANG

LEBAR

TINGGI

URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F19

JUMLAH

FFF20
URAIAN

PANJANG

LEBAR

TINGGI

JUMLAH

VOLUME

m1

m1

m1

bh

F20

JUMLAH

S-ar putea să vă placă și