Sunteți pe pagina 1din 9

No

Marking Scheme / Skema markah

Marks
Submarks Total Marks

(a)

1 mark
G

(b) Award 2 marks if shade ( E F ) ' G '

Award 1 mark if shade ( E F ) '


F

2 marks

3 marks

No
2

Marking Scheme / Skema markah

Submarks Total Marks

4.50 x 6.00 y 46.50 or

x y

19
1
@9
2
2

31 4 y
3
31 3 x
y
4

Marks
1 mark

or equivalent

19
y
2
or
19
y
x
2
or equivalent

or
or

1 mark
4 marks

x = 7 or y = 2.50

1 mark

The weight of durian is 2.50 kg

1 mark

Berat durian ialah 2.50 kg


x

x 27 = 269.5

1 mark

or (y + 4) 2 = 49

1 mark

( y 3) ( y + 11 ) = 0 or y + 4 =

1 mark

radius / jejari = cm

1 mark

VEF

(a)

1 mark

(b)

1 mark
//

5.

4 marks

(a) a { a, b, c} or

3 marks

1 mark
1 mark

{x, y, z}

(b) If PQR is a right-angled triangle, then Q = 90

2 marks

Jika PQR ialah segi tiga bersudut tegak, maka Q = 90


(c) If n( A) = n( B), then Set A = Set B

5 marks
1 mark

Jika n( A) = n( B), maka Set A = Set B


1 mark

False / Palsu
6.

(a) A (-2, 7)

1 mark

(b) x =

1 mark

(c) m = or

or equivalent

or c =

1 mark
1 mark

5 marks

No

Marking Scheme / Skema markah

Marks
Submarks Total Marks

7.

1 mark

x r x 35 = 1320

r=6

1 mark

Height / Tinggi = 95 6 35

1 mark

= 54 cm

4 marks

1 mark

8.

1 mark
1 mark
(

)( )

1 mark

(
)(
)
( )
( )
A = RM 85
Cost of adults ticket is RM 85.
Harga sekeping tiket dewasa ialah RM 85

1 mark

( ) (

) x ( ) x 14 or (

)x( )x7

1 mark

) x ( ) x 14 + (

)x( )x7 + 7

1 mark

( )

1 mark
1 mark

1 mark

cm
(b) (

) x ( ) x 14 x 14 or (
x 7 x (

) x ( ) x 14 x 14 - (

) x ( ) x 7 x 7 or

1 mark

6 marks

)
)x( )x7x7-

x 7 x (

30.12 cm2
10

6 marks

(a) {(R1,R2), (R1,R3), (R1,B), (R1,Y), (R2,R1), (R2,R3), (R2,B),

) 1 mark
1 mark
2 marks

(R2,Y), (R3,R1), ( R3,R2), (R3,B), (R3,Y), (B,R1), (B,R2),


(B,R3), (B,Y), (Y,R1), (Y,R2), (Y,R3) (Y1,B)}
(b) {(R1,R2), (R1,R3), (R2,R1), (R2,R3), (R3,R1), ( R3,R2)}

1 mark
1 mark

(c) {(R1,B), (R1,Y), (R2,B), (R2,Y), (R3,B), (R3,Y), (B,R1), (B,R2),

1 mark

(B,R3), (B,Y), (Y,R1), (Y,R2), (Y,R3) (Y1,B)}


1 mark

6 marks

No

Marking Scheme / Skema markah

Marks
Submarks Total Marks

11

(a) (i) p = 60 km

1 mark

q = 175 minutes / minit

1 mark

(ii)
Jarak ( km)
Distance ( km)

125

2 marks
P=
.=
0

65

105

q=.

415

505

Time (minutes)
Masa (minit)

(b) Speed / laju =

1 mark

km h-1 /
12.

6 marks

km j-1

1 mark

(a)
x
y

-3.5
23.25

0.5
- 8.75

1 mark
1 mark

(b) Graph
Axes are drawn in the correct direction, uniform scale for

1 mark

-5 x 3.
7 points and 2 points* plotted accurately

2 marks
1 mark

Smooth and continuous curve without straight line(s) and


passes through all the 9 correct points for -5 x 3.
12 marks
Notes : (1) 7 or 8 points plotted correctly, award 1 mark
(2) Other scale being used, subtract 1 mark
(c) (i) 6 < y < 8

1 mark

(ii) 14 < x < 16

1 mark

Note: Do not accept the values of x and y obtained by calculation


(d) Identify the equation y = 7x + 30 or equivalent

1 mark

The straight line y = 7x + 30 drawn correctly

1 mark

The value of x:

2 marks

-2.9 < x < - 2.7

Note: Deduct 1 mark if two values of x are given.

No

Marks

Marking Scheme / Skema markah

Submarks Total Marks

13

2 marks

(a) (i) (7, 6)


Note : (-3, 4) award 1 mark

2 marks

(ii) (5, 4)
Note : (-1, 2) award 1 mark
(b) (i) U is enlargement with scale factor 2 at centre B(1, 4).

3 marks

U ialah pembesaran dengan skala factor 2 di pusat B(1,4)


Note: 1. Accept enlargement with scale factor of 2 for 2 marks.
1. Enlargement and centre (1, 4) for 2 marks.
12 marks

2. Enlargement only for 1 mark.


3 marks

(ii) V is rotation
clockwise at centre (-2, 5).
V ialah putaran
arah jam pada pusat (-2, 5).
Note: 1. Accept Rotation

clockwise for 2 marks.

2. Rotation and centre (-2, 5) for 2 marks.


3. Rotation only for 1 mark.
( )

(c)

1 mark

(2)2x x = 240

or

1 mark
14

(a)

Column I
Merit points
Mata Merit
58

Column II
Titik tengah
Mid point
6.5

9 12

10.5

13 16

14.5

17 20

18.5

21 24

22.5

25 - 28

26.5

(b) Mean =
Note : Allow two mistakes to award 1 mark.

Column III
Kekerapan
Frequency
5

Column I
1 mark
Column II
1 mark
Column III

2 marks
12 marks
2 marks

15.64

1 mark

(c) Axes are drawn in the correct direction, uniform scale for
0 vertical axis 9 and 2.5 horizontal axis 20.5

1 mark

All points plotted accurately.

2 marks

(d) 8

2 marks

No

Marks

Marking Scheme / Skema markah

Submarks Total Marks

15
(a)

2 cm

3 cm

7 cm

4 cm

15

8 cm

Shape visually correct and all lines are solid.

1 mark

EF FR EL LK JR

1 mark

Measurements accurate up to 0.2 cm (one way) and all right


angles = 90o 1o

1 mark

(b) (i)

3 cm

6 cm

12 marks
L

Shape visually correct with rectangles EKNH, KJPN, BAGP and ABJF ,
all lines are solid.

1 mark

FE EH HN = NP = PB BA

1 mark

Measurements accurate up to 0.2 cm (one way) and all right


angles = 90o 1

2 marks

No

Marking Scheme / Skema markah

Marks
Submarks Total Marks

(b) (ii)

3 cm

3 cm

3 cm

4 cm

16

6 cm

Shape visually correct with solid lines rectangles FGPJ and TWBJ

1 mark

W and N joined with a dashed line.

1 mark

PB = BJ = JT TF FG

1 mark

Measurements accurate up to 0.2 cm (one way) and all right


angles = 90o 1o

2 marks

(a)

2 marks

E/T

Note: Award 1 mark for


(
(b) (

or

E / T is seen

E)

1 mark

2 marks

Note: Award 1 mark (

) or

is seen

3 071.69 nautical miles

1 mark

(c)

1 mark

or

or
) / T or

1 mark

U or 21 10 N / U

1 mark

(d) 6 921.69 nautical miles / batu nautika

1 mark
1 mark

19.78 hours / jam

1 mark

12 (a)
x

3.5

0.5

60

34

23.25

10

-8.75

20

60

50

40

30

20

10

0
-5

-4

-3

-2

-1

x
1

-10

-20

-30

-40

14(c)
frequency

11

10

0
2.5

6.5

10.5

14.5

18.5

22.5

26.5

30.5

merit points

S-ar putea să vă placă și