Documente Academic
Documente Profesional
Documente Cultură
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
1 / 25
ME
MEMRIA DESCRITIVA
Pginas revistas:
12/05/2010
F. Brotas Carvalho
F. Brotas Carvalho
28/02/2010
F. Brotas Carvalho
F. Brotas Carvalho
21/07/2008
Actualizao
F. Brotas Carvalho
F. Brotas Carvalho
10/07/2008
F. Brotas Carvalho
F. Brotas Carvalho
27/06/2008
Emisso Inicial
F. Brotas Carvalho
F. Brotas Carvalho
Rev
Data
DD/MM/AA
DESCRIO
EMITIDO
(nome & rbrica)
VERIFICADO
(nome & rbrica)
APROVAO TCNICA
(nome & rbrica)
REVISES DO DOCUMENTO
As seces modificadas na ltima reviso so identificadas por uma linha vertical na margem direita
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.b
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
2 / 25
ME
NDICE
1.
NOTA INTRODUTRIA
2.
3.
MBITO DO ESTUDO
4.
DOCUMENTOS BASE
5.
VISITA AO LOCAL
6.
7.
8.
METODOLOGIA DE ANLISE
9.
CRITRIOS DE PROJECTO
14
10.
14
11.
CONCLUSO
17
12.
REFERNCIA BIBLIOGRFICAS
18
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
3 / 25
ME
1. NOTA INTRODUTRIA
O presente relatrio consiste num estudo sobre o regime de cheias num troo da Ribeira de Sassoeiros
em Carcavelos elaborado pela TECHNOEDIF ENGENHARIA para o Departamento de Planeamento
Estratgico (DPE) da Cmara Municipal de Cascais.
Apresentam-se resultados grficos e numricos relativos ao comportamento em cheia do troo de
ribeira em causa, que se desenvolve entre a Auto-estrada A5, a montante e a Avenida Dr. Francisco S
Carneiro, a jusante.
Nestas situaes requerido o estudo da Cheia Centenria para o local.
Para T=100, o mximo caudal de cheia, na entrada de montante do troo em estudo, dever ser de
21m3/Seg (evoluindo para jusante para 25 m3/seg e o tempo de concentrao (Tc) de 2h30min, dados
base estes que constam de um relatrio anterior, da Hidroprojecto; mais frente referenciado, e que se
situa como base de referncia deste projecto no que diz respeito a caudais de projecto para a zona.
Como se ver mais frente esse caudal do leito principal receber uma contribuio lateral esquerda
que o far elevar para 25 m3/seg. (Valores de caudal amortecidos pela albufeiras construdas a
montante).
Verificava-se que o escoamento natural da ribeira, e a correspondente ocupao do Leito de Cheia, so
actualmente perturbados pelo posicionamento de um muro delimitador de propriedade (Ponto
Referenciado X), atravessando-se perpendicularmente em toda a extenso da faixa natural de
alagamento. (Este muro foi entretanto derrubado parcialmente sob ordem da Cmara Municipal de
Cascais)
Este muro tem uma passagem hidrulica, que funciona normalmente em regime afogado, mas que,
mesmo nessa situao afogada no tem capacidade para a cheia centenria.
Este facto implicava que, para as situaes de cheia importantes, o nvel das guas a montante deste
muro aumenta muito expressivamente, implicando, previsivelmente, o seu derrube com causas
decorrentes difceis de configurar, situao entretanto parcialmente neutralizada.
Como consequncia deste facto os caudais de uma cheia importante poderiam ser transferidos em
grande parte para a via EN 6-7, a poente do leito, e que se implanta paralelamente a uma cota bastante
mais baixa. As consequncias desta transferncia lateral de caudal poderiam ser graves.
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
4 / 25
ME
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
5 / 25
ME
O leito de cheia esquerdo est em depresso, com cotas visivelmente inferiores ao leito principal.
natural que em situao de cheia, os caudais se desviem para a esquerda do leito principal.
O designado Aldeamento das encostas integra uma rea de lazer totalmente vedada que limitada a
Norte por um Muro de alvenaria, de 4,0 m de altura. Este muro (ponto X) faz barreira total ao leito de
cheia. Recentemente, por uma questo de segurana este muro foi derrubado por instrues da
Cmara Municipal de Cascais.
Este muro possui uma passagem hidrulica inferior com uma capacidade mxima de escoamento de
cerca de 19m3/Seg (no caso de se encontrar totalmente desobstruda).
Para o hidrograma de cheias Centenrio que foi considerado, esta situao no conduz a uma
estabilizao, mas antes propicia o derrube de muros laterais e grave transferncia de caudais para a
Via rpida lateral de se desenvolve a cota inferior.
O condomnio privado tem a ribeira canalizada atravs de um canal aberto, rectangular e em beto. O
actual canal tem uma capacidade mxima terica de 19 m3/seg, para o seu segmento de menor
pendente longitudinal.
Por fim a passagem hidrulica sob a Avenida Francisco S Carneiro que se situa no limite Sul do
condomnio privado tem uma capacidade de vazo controlada por um regime de montante, igualmente
de cerca de 19 m3/Seg. 1
Tambm esta passagem hidrulica rodoviria deve ser reforada para uma seco de 8 x 1.5 m2. Com
esta nova seco todo o leito de cheia at ao muro do condomnio ser encaixado em situao
centenria (T=100)
3. MBITO DO ESTUDO
O mbito fundamental do Estudo que o DPE encomendou TECHNOEDIF ENGENHARIA a
demarcao grfica, a escala apropriada, dos nveis de alagamento para uma Cheia Centenria.
Esta Cheia Centenria vem descrita na NOTA TCNICA, Regularizao do Troo Superior da Ribeira
de Sassoeiros, elaborado pela HIDROPROJECTO em Julho de 2003.
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
6 / 25
ME
O domnio do presente estudo est delimitado pela AE-A5 a Norte e pela Avenida Dr. Francisco S
Carneiro a Sul. Integra a poente uma pequena linha de gua afluente proveniente da Quinta dos
Gafanhotos, que era originalmente devida a cerca de 5 hectares do loteamento da Brisa, hoje em dia
isolados pelo aterro da AE-A5.
A definio grfica dos nveis de alagamento da ribeira de Sassoeiros ser fundamentada a partir dos
seguintes clculos.
I-
4. DOCUMENTOS BASE
A DPE Forneceu TECHNOEDIF ENGENHARIA os seguintes elementos de base para a elaborao do
Estudo.
a)
b)
c)
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
7 / 25
ME
20
15
HIDROGRAMA DE
CHEIA CENTENARIA
10
5
0
0
50
0
10
0
15
0
20
0
25
0
30
0
35
0
40
5. VISITA AO LOCAL
Em Junho de 2008, foi efectuada uma visita ao local em estudo, a qual confirmava as observaes de
Junho de 2004, no se tendo verificado alteraes assinalveis. Tivemos na ocasio oportunidade de
recolher informaes in situ sobre os tipos de ocupao do leito, obter os registos fotogrficos2
necessrios e esclarecer as dimenses de estruturas e passagens fundamentais para a determinao
do regime de escoamento.
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
8 / 25
ME
Nesta ultima visita ao local foi determinado o que de seguida se descreve relativamente ao afluente
direito da ribeira de Sassoeiros proveniente do loteamento da Brisa e da Urbanizao da Quinta dos
Gafanhotos:
Este local foi utilizado para estaleiro durante as obras da Auto-estrada A5 para estaleiro. Foi em
consequencia disso objecto de fortes movimentaes de terra e inclusivamente de construes
provisrias em beto armado. Durante essa utilizao a linha de gua existente foi canalizada numa
tubagem DN 300 em beto, hoje em dia assoreada. Dessa forma, e como a ribeira perdeu qualquer
expresso geomtrica no perfil transversal do leito, a partir de uma determinado ponto (perfil P19.5), os
caudais pluviais afluentes espraiam-se de forma descontrolada pelas encostas numa larga faixa.
Esta Situao carece de tratamento que mais frente preconizado concretamente.
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
9 / 25
ME
Na face Norte do chamado Aldeamento da Encostas o leito de cheias sofria uma barragem muito
importante atravs de um muro de alvenaria, com altura entre 4.0 e 5.0 metros (Ponto X). O
escoamento atravessa o muro atravs de uma passagem inferior rectangular de dimenso 1,90 x 1,80.
Para jusante o leito da ribeira percorre um canal rectangular, em beto armado com pendente mdia de
1,3% e seco transversal (1,9 x 1,8) m2. Esse muro, no decurso deste estudo foi derrubado por medida
de segurana da Cmara Municipal de Cascais.
No limite Sul do recinto privado o canal expande para uma passagem inferior rectangular sob a Av. Dr.
S Carneiro, esta com dimenso (4,0 x 1,5) m2, inclinao mdia de fundo 3,3% e comprimento de 15m.
8. METODOLOGIA DE ANLISE
A metodologia de abordagem do clculo do regime de cheia teve incio com uma visita detalhada ao
local em estudo. Nesta ocasio foi confrontada a informao fornecida pela Cmara Municipal de
Cascais com a confirmao local de dimenses.
Com o fim de apoiar o modelo matemtico de escoamento identificmos os pontos crticos (Pontos X e
Z, apresentados nas Plantas) que condicionam o escoamento, as suas seces caractersticas,
determinando em cada um deles as dimenses de interesse para o clculo.
8.1. Regime de Escoamento
Quando analisamos o escoamento em cheia (Cheia Centenria) verifica-se que, em virtude das fortes
inclinaes, o regime Rpido, ou seja, com a cota de regolfo inferior altura crtica de
escoamento. Este regime condicionado sobretudo pelas condicionantes de montante.
Avalimos o regime de escoamento e a capacidade mxima associada da passagem hidrulica sob a
Avenida Dr. S Carneiro, em seguida a mxima capacidade de escoamento do canal rectangular em
beto que se implanta num recinto privado e, por fim, o regime de vazo do orifcio colocado na parede
de alvenaria do Muro Norte do recinto privado (1,9 x 1,8 m2)3.
Foi determinado que o orifcio rectangular inserido na base de um muro de alvenaria o ponto-chave do
estrangulamento do escoamento do leito de Cheia que se coloca para montante do vale.
8.2. Clculo da Capacidade de Escoamento dos Pontos Crticos
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
10 / 25
ME
Qm3 / seg K S Rh 3 i 2
Q
K i
1
2
S
P
5
3
2
3
[1]
Qm3 / seg Cd S 2 g H
[2]
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
11 / 25
ME
Q 3
m / seg
HM HJ
2
K SR 3
h
Q2
Q2
0
,
5
( m)
S 2 2 g
S 2 2 g
[3]
4 Note-se como esta capacidade mxima corresponde tambm capacidade mxima da PH sob a Av. Dr. S Carneiro.
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
12 / 25
ME
Ao longo do vale, para montante da zona inundvel anexa ao muro Norte do recinto privado, a
propagao da cheia foi calculada perfil a perfil, tendo em conta o caudal de referncia de 25 m3/seg, as
velocidades seco a seco e o crescimento gradual da linha de energia.
O software utilizado foi o HEC-RAS5, River Analysis System, desenvolvido pelo U.S Army Corps of
Engineers, programa sofisticado e que uma evoluo do conhecido software HEC-2.
A equao fundamental do HEC-RAS para o clculo da linha de regolfo a equao da energia. A
equao da continuidade de momento utilizada em situaes de ressalto hidrulico, confluncias, etc.
Os mtodos de clculo de perdas de carga em PHs e pontes envolvem as equaes energticas, de
momento, equao de Yarnell e FHWA WSPRO.
O HEC-RAS detecta se o regime crtico, rpido ou lento, detecta automaticamente nas passagens
hidrulicas o regime de controlo, a montante, a jusante ou interno, prev bifurcao de leitos, ocupao
dos mais diversos leitos de cheia e simula as consequncias de estreitamento de leitos de cheia.
Cada seco transversal do leito principal/ Leito da Ribeira foi caracterizada geometricamente por uma
sequencia de valores x,y, sendo x uma abcissa referenciada a uma origem 0, esquerda da seco, e y
a cota topogrfica.
Cada seco hidrulica caracterizada por,
A = [(x1y2+x2yn-1+xny1) (y1x2+y2xn-2+.ynx1)]
[4]
e o permetro hidrulico,
P = [(x1-x2)2+(y1-y2)2]1/2 + [(x2-x3)2+(y2-y3)2]1/2..[(xn-1-xn)2 + (yn-1-yn)2]1/2 [5]
Sendo em cada seco e nvel o Raio Hidrulico definido por,
Rh= A/P
[6]
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
13 / 25
ME
B = xn-x1
[7]
O clculo da linha de regolfo comea no perfil de jusante com a predefinio da altura de cheia de
jusante WS0.
Se, eventualmente, houver um pequeno erro nesta estimativa, o mesmo rapidamente corrigido nas
seces de jusante. O caudal considerado constante em cada momento. A equao V=Q/A, possibilita
em cada seco a determinao da velocidade de escoamento V e logo a seguir se determina a altura
cintica V2/2g que dever ser adicionada a WS.
A inclinao da linha de energia Sf igualmente calculada a partir da Equao de Manning [2] com
K=30 .
Daqui se calcula WS2 (seguinte nvel para montante) = WS0 + Sf x
[8]
[9]
WS
H 2
3 S f 2 x
2
1 Fr2
2 R2
[10]
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
14 / 25
ME
Fr
V
A
g
B
[11]
J que A/B pode ser considerada uma aproximao da altura mdia de escoamento.
9. CRITRIOS DE PROJECTO
Dados os mtodos de clculo que acima foram expostos, descrevem-se de seguida os principais
critrios de anlise:
O caudal base da Ribeira de Sassoeiros foi considerado de 21m3/seg
O caudal a considerar para o afluente direito de 2.50 evoluindo para 3,33 m3/seg
Desta forma, aps a confluncia W (assinalado nas plantas como Perfil 19 o caudal de clculo ser de
25m3/seg, por coerncia interna do modelo de clculo estabelecido.
Clculo de escoamento em canais de superfcie livre
utilizada a Frmula de Manning-Strickler.
Coeficiente de rugosidade em leitos principais e de cheia n = 0.033
Coeficiente de rugosidade em fundos e muros laterais em beto n = 0.016
Escoamento em passagens hidrulicas.
Foram utilizados os seguintes coeficientes
Coeficiente de perda localizada entrada( aresta viva) KE=0.5
Coeficiente de perda de carga sada
KS=1.0
Coeficiente de contraco em escoamento em orifcio (controle a montante) Cc=0.62
Escoamento sobre muros e estradas (regime de descarregador de superfcie livre)
Foi utilizado o Coeficiente de descarregador de superfcie livre CD=1.44
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
15 / 25
ME
Qm 3 / seg
C imm / hora Am 2
3600 1000
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
16 / 25
ME
De facto esta precipitao excede a mxima precipitao verificada para a Zona de Lisboa (estao
meteorolgica do IGIDL) para um perodo de retorno de T=100 (precipitao centenria) que de cerca
de 31 mm em 30 minutos.6
rea Impermeabilizada actual adoptada foi de 40%, tendo em conta a rea impermeabilizada da
urbanizao da Brisa, a urbanizao da Quinta dos Gafanhotos e impermeabilizaes decorrentes de
novas vias de circulao. No futuro, qualquer operao de impermeabilizao dever ser
contrabalanada pela construo de reservatrios de reteno-devoluo de caudais pluviais, que na
pratica diminuiro os caudais de afluncia instantnea a esta pequena linha de gua.
Segundo as normas regulamentares pode-se considerar o seguinte coeficiente de escoamento C=0,75
(terreno compacto, inclinao entre 1 e 8%)
Caudal de Ponta a adoptar segundo a Frmula Racional
Qm3 / seg
0.75 64 250000
3.33m3 / seg
3600 1000
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
17 / 25
ME
11. CONCLUSO
Os pontos crticos detectados so na situao actual no transformada os seguintes:
Ponto X passagem hidrulica em muro de propriedade privada que por ser insuficiente provocaria
uma subida de nvel para montante, a uma cota superior a 36. Esta situao foi entretanto eliminada
pela demolio preventiva, pela CMC, do Muro.
Ponto Z Passagem hidrulica rodoviria sob a Avenida S Carneiro. Por ser de insuficiente seco
(para a cheia centenria), provoca uma subida de nvel e galgamento da faixa de rodagem em 30-40cm.
Esta subida de nvel aproxima-se seriamente do risco de galgamento lateral para a via rpida.
Situao Transformada.
- Entre as Cotas 50.25 - perfil 21 e 31.40 (zona do Muro delimitador da urbanizao das Encostas) o
canal principal dever ser alargado para uma seco de 8 m de base e 1.5 metros de altura, de forma
que possa conter completamente na sua seco os limites da cheia centenria. Esse alargamento
acompanhado de um trabalho paisagstico de renaturalizao do leito, com materiais permeveis e
naturais.
- O muro e a passagem hidrulica a montante do Aldeamento das encostas sero removidos.
- O canal rectangular em beto, que atravessa o aldeamento das encostas totalmente reforado por
um canal trapezoidal em materiais permeveis (gabies), com um rasto de 4.0 m, uma altura hidrulica
de 2.0 m e uma largura total exterior de 10.0 m. Esta estrutura de canal tem capacidade para conter a
totalidade do caudal mximo centenrio, de 25 m3/seg.
- A Passagem hidrulica rodoviria sob a Av. S Carneiro deve ser ampliada para as dimenses (8x1.5)
m2. (LxH).
A nvel de comentrio final deve ser registado que para montante da cota 34 o regime de escoamento
da ribeira, que rpido, no afectado pelas perturbaes dos pontos crticos de jusante, na situao
no transformada.
Nos anexos III e IV so apresentados os quadros resumo dos parmetros de escoamento da Ribeira,
em primeiro lugar numa situao de referncia, no transformada, ou seja com as passagens
hidrulicas com as deficincias actuais e de seguida numa situao transformada em que as passagens
hidrulicas foram revistas.
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Activ. / Unid.
1827
Cd. Material
N.O.
Rev.
Pg.
1442
01
18 / 25
ME
No fim, em anexo, so apresentados perfis fora de escala com as alturas de escoamento identificando
inequivocamente as manchas de alagamento.
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
ANEXO I
REGISTOS FOTOGRFICOS
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
FOTO 1
FOTO 2
FOTO 3
FOTO 4
FOTO 5
FOTO 6
FOTO 7
FOTO 8
FOTO 9
FOTO 10
FOTO 11
FOTO 12
FOTO 13
FOTO 14
FOTO 15
FOTO 16
FOTO 17
FOTO 18
FOTO 19
RUA A OLIVEIRA.
TROO DE FORTE INCLINAO.
VISTA PARA MONTANTE.
ANEXO II
SITUAO NO TRANSFORMADA
PARMETROS DE ESCOAMENTO
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Designao do Perfil
P29
66.00
P26
60.50
P24
56.00
P22
52.50
P21
50.25
44.00
P19.1-afluente
48.00
P19.5
55.00
P19.10
67.00
P10
32.25
31.40
P08
31.00
P04
28.50
28.00
P03
27.00
25.50
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
PPEETAnat.prj
Geom: sassoeiros
Plan: Plan 01
24-02-2010
Legend
Crit PF 1
EG PF 1
140
WS PF 1
Ground
Set WS
Elevation (m)
120
100
80
60
40
0
100
200
300
Main Channel Distance (m)
400
500
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
70.0
Legend
69.5
EG PF 1
WS PF 1
Elevation (m)
69.0
Crit PF 1
68.5
Ground
Bank Sta
68.0
67.5
67.0
66.5
0
10
20
30
40
50
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
69
Legend
EG PF 1
Elevation (m)
68
Crit PF 1
WS PF 1
67
Ground
Bank Sta
66
65
64
0
10
20
30
40
50
60
70
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
64.0
Legend
63.5
EG PF 1
63.0
WS PF 1
Elevation (m)
Crit PF 1
Ground
62.5
Bank Sta
62.0
61.5
61.0
0
10
20
30
40
50
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
62.0
Legend
EG PF 1
Elevation (m)
61.5
Crit PF 1
WS PF 1
Ground
61.0
Bank Sta
60.5
60.0
0
20
40
Station (m)
60
80
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
Legend
Elevation (m)
59.8
EG PF 1
59.6
Crit PF 1
59.4
WS PF 1
Ground
59.2
Bank Sta
59.0
58.8
58.6
58.4
0
10
20
30
40
50
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
Elevation (m)
Legend
56.8
EG PF 1
56.6
Crit PF 1
56.4
WS PF 1
Ground
56.2
Bank Sta
56.0
55.8
55.6
55.4
0
10
20
30
40
50
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
55.0
Legend
EG PF 1
Elevation (m)
54.5
Crit PF 1
WS PF 1
54.0
Ground
Bank Sta
53.5
53.0
52.5
0
10
20
30
40
50
60
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
52.0
Legend
EG PF 1
Elevation (m)
51.5
Crit PF 1
WS PF 1
51.0
Ground
Bank Sta
50.5
50.0
49.5
0
20
40
60
80
Station (m)
100
120
140
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.
0
3
3
48.0
.033
Legend
EG PF 1
Elevation (m)
47.5
Crit PF 1
WS PF 1
Ground
47.0
Bank Sta
46.5
46.0
0
20
40
60
80
100
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.
0
3
3
Elevation (m)
45.8
.033
Legend
EG PF 1
45.6
Crit PF 1
45.4
WS PF 1
45.2
Ground
Bank Sta
45.0
44.8
44.6
44.4
0
20
40
60
80
100
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
45
.
0
3
3
Legend
EG PF 1
Elevation (m)
44
WS PF 1
Ground
Bank Sta
43
42
41
0
10
15
Station (m)
20
25
30
Profile: PF 1
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
troo montante
67
PF 1
21.00
67.00
68.48
68.48
69.08
0.014643
3.48
6.24
5.48
troo montante
63
PF 1
21.00
63.00
63.69
64.51
66.66
0.152090
7.64
2.75
4.04
2.95
troo montante
61
PF 1
21.00
61.00
62.18
62.51
63.09
0.027899
4.34
5.59
15.03
1.29
troo montante
57
PF 1
21.00
57.00
57.79
58.47
60.19
0.109368
6.87
3.06
3.96
2.50
troo montante
54
PF 1
21.00
54.00
55.04
55.50
56.32
0.043562
5.01
4.30
7.66
1.59
troo montante
50
PF 1
21.00
50.00
51.47
51.97
53.04
0.055843
5.71
3.98
5.37
1.71
troo montante
47
PF 1
25.00
47.00
48.19
48.61
49.50
0.039074
5.17
5.42
12.11
1.53
troo montante
44
PF 1
25.00
44.00
44.96
45.54
46.40
0.049885
5.33
4.69
4.99
1.75
troo montante
42
PF 1
25.00
42.00
44.11
44.42
44.82
0.018221
4.30
8.12
15.25
0.96
troo montante
40.25
PF 1
25.00
40.25
41.45
41.99
43.31
0.051790
6.13
4.29
5.36
1.95
afluente direito
67
PF 1
3.30
66.50
66.93
66.93
67.06
0.017673
1.56
2.12
8.80
1.01
afluente direito
64
PF 1
3.30
64.00
64.28
64.48
65.14
0.195680
4.11
0.80
4.68
3.17
afluente direito
61
PF 1
3.30
61.00
61.40
61.50
61.75
0.041044
2.62
1.26
4.37
1.56
afluente direito
60
PF 1
3.30
60.00
60.30
60.31
60.40
0.021389
1.38
2.40
13.82
1.06
afluente direito
59
PF 1
3.30
58.50
59.05
59.08
59.18
0.072079
1.61
2.07
24.04
1.72
afluente direito
55.5
PF 1
3.30
55.50
55.84
56.09
56.51
0.087295
3.63
0.91
3.36
2.23
afluente direito
53
PF 1
3.30
52.50
53.04
53.08
53.18
0.130561
1.68
1.97
32.58
2.17
afluente direito
50
PF 1
3.30
49.50
50.07
50.09
50.17
0.039070
1.43
2.37
22.43
1.33
afluente direito
47
PF 1
3.30
46.00
46.41
46.59
46.99
0.059043
3.38
0.98
2.81
1.83
afluente direito
45
PF 1
3.30
44.50
45.03
45.11
45.34
0.027478
2.55
1.71
22.89
1.29
afluente direito
42
PF 1
3.30
41.00
44.10
44.10
0.000018
0.19
20.95
17.45
0.04
troo jusante
40.2
PF 1
25.00
40.20
41.05
41.81
43.80
0.116538
7.35
3.40
4.16
2.59
troo jusante
38.5
PF 1
25.00
38.50
39.13
39.28
39.76
0.043521
4.23
9.46
51.40
1.71
troo jusante
37.5
PF 1
25.00
37.50
37.50
37.51
37.67
0.016153
0.10
13.82
48.55
0.49
troo jusante
35.7
PF 1
25.00
35.50
36.79
36.46
36.83
0.001790
0.93
29.98
55.91
0.33
troo jusante
35
PF 1
25.00
35.00
36.79
36.80
0.000231
0.57
62.21
79.04
0.14
troo jusante
34.3
PF 1
25.00
34.30
35.90
35.90
36.68
0.019319
3.92
6.38
4.09
1.00
troo jusante
33
PF 1
25.00
33.00
36.24
34.30
36.24
0.000019
0.23
126.83
66.51
0.04
troo jusante
32
PF 1
25.00
32.00
36.24
33.26
36.24
0.000005
0.35
122.67
50.10
0.06
troo jusante
31.9
Culvert
0.92
Profile: PF 1 (Continued)
River Sta
Profile
Q Total
Min Ch El
W.S. Elev
Crit W.S.
E.G. Elev
E.G. Slope
Vel Chnl
Flow Area
Top Width
(m3/s)
(m)
(m)
(m)
(m)
(m/m)
(m/s)
(m2)
(m)
Froude # Chl
troo jusante
31.8
PF 1
25.00
31.80
34.35
34.35
34.61
0.002306
2.87
16.70
29.44
0.59
troo jusante
31
PF 1
25.00
30.00
31.19
31.59
33.86
0.030435
8.25
5.84
24.27
2.43
troo jusante
29
PF 1
25.00
29.00
31.01
31.28
32.02
0.008266
4.99
9.88
40.21
1.15
troo jusante
28.8
troo jusante
28
28.00
28.80
29.45
30.82
0.083700
6.31
3.96
5.06
1.15
Culvert
PF 1
25.00
PPEETAnat.prj
Geom: sassoeiros
Plan: Plan 01
24-02-2010
70
Legend
EG PF 1
Crit PF 1
WS PF 1
60
Ground
Elevation (m)
50
40
30
20
0
200
400
600
800
1000
1200
1400
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
62
Legend
EG PF 1
Elevation (m)
60
Crit PF 1
WS PF 1
Ground
58
Bank Sta
56
54
0
10
20
30
40
50
60
70
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.
0
3
3
56
.033
Legend
EG PF 1
55
Elevation (m)
Crit PF 1
54
WS PF 1
Ground
53
Bank Sta
52
51
50
0
20
40
60
80
100
120
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.
0
3
3
51
.033
Legend
EG PF 1
Elevation (m)
50
Crit PF 1
WS PF 1
Ground
49
Bank Sta
48
47
0
20
40
60
80
100
120
140
160
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.
0
3
3
49
.033
Legend
EG PF 1
Elevation (m)
48
Crit PF 1
WS PF 1
47
Ground
Bank Sta
46
45
44
0
20
40
60
80
Station (m)
100
120
140
160
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.
0
3
3
47
.033
Legend
EG PF 1
46
Elevation (m)
Crit PF 1
WS PF 1
45
Ground
Bank Sta
44
43
42
0
20
40
60
80
100
120
140
160
180
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
44
Legend
EG PF 1
Elevation (m)
43
Crit PF 1
WS PF 1
Ground
42
Bank Sta
41
40
0
20
40
60
Station (m)
80
100
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
44
.
0
3
3
Legend
EG PF 1
Elevation (m)
43
Crit PF 1
WS PF 1
Ground
42
Bank Sta
41
40
0
10
20
30
40
50
60
70
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
42.0
41.5
.
0
3
3
Legend
EG PF 1
Crit PF 1
Elevation (m)
41.0
WS PF 1
40.5
Ground
Bank Sta
40.0
39.5
39.0
38.5
0
20
40
60
80
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
40.0
Legend
39.5
EG PF 1
39.0
WS PF 1
Elevation (m)
Crit PF 1
Ground
38.5
Bank Sta
38.0
37.5
37.0
0
20
40
60
80
100
120
140
160
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
39.0
Legend
38.5
EG PF 1
WS PF 1
Elevation (m)
38.0
Crit PF 1
37.5
Ground
Bank Sta
37.0
36.5
36.0
35.5
0
20
40
60
Station (m)
80
100
120
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
39
Legend
EG PF 1
Elevation (m)
38
WS PF 1
Ground
Bank Sta
37
36
35
0
20
40
60
80
100
120
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
39
.
0
3
3
Legend
EG PF 1
Elevation (m)
38
WS PF 1
Crit PF 1
37
Ground
Bank Sta
36
35
34
0
20
40
60
80
100
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
38
Legend
EG PF 1
Elevation (m)
37
WS PF 1
Crit PF 1
36
Ground
Bank Sta
35
34
33
0
10
20
30
40
50
60
70
80
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.014
37
.
0
3
3
Legend
EG PF 1
Elevation (m)
36
WS PF 1
Crit PF 1
35
Ground
Bank Sta
34
33
32
0
10
20
30
Station (m)
40
50
60
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.03
37
Legend
EG PF 1
36
Elevation (m)
WS PF 1
35
Crit PF 1
Ground
34
Bank Sta
33
32
31
0
10
20
30
40
50
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.03
35.0
Legend
34.5
EG PF 1
WS PF 1
Elevation (m)
34.0
Crit PF 1
33.5
Ground
33.0
Bank Sta
32.5
32.0
31.5
0
10
20
30
40
50
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.03
34
Legend
EG PF 1
Elevation (m)
33
Crit PF 1
WS PF 1
Ground
32
Bank Sta
31
30
0
10
20
30
40
50
60
Station (m)
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.03
32.5
Legend
32.0
EG PF 1
Crit PF 1
Elevation (m)
31.5
WS PF 1
31.0
Ground
30.5
Bank Sta
30.0
29.5
29.0
0
10
20
30
40
Station (m)
50
60
70
80
PPEETAnat.prj
Plan: Plan 01
24-02-2010
.033
.033
31.0
Legend
EG PF 1
Crit PF 1
30.5
WS PF 1
Ground
Bank Sta
Elevation (m)
30.0
29.5
29.0
28.5
28.0
0
20
40
60
Station (m)
80
100
120
PPEETAnat.prj
Plan: Plan 01
24-02-2010
32.0
.03
Legend
EG PF 1
Crit PF 1
31.5
WS PF 1
Ground
Elevation (m)
31.0
Bank Sta
30.5
30.0
29.5
29.0
28.5
0
10
20
30
40
Station (m)
50
60
70
80
ANEXO III
SITUAO TRANSFORMADA
PARMETROS DE ESCOAMENTO
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
Designao do Perfil
P29
66.00
P26
60.50
P24
56.00
P22
52.50
P21
50.25
44.00
P19.1-afluente
48.00
P19.5
55.00
P19.10
67.00
P10
32.25
31.40
P08
31.00
P04
28.50
28.00
P03
27.00
25.50
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
AFLUENTE REQUALIFICADO
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
aflu_final
Plan: Plan 01
11-01-2010
.03
.03
67.0
Legend
EG PF 1
66.5
Elevation (m)
WS PF 1
66.0
Crit PF 1
Ground
65.5
Bank Sta
65.0
64.5
64.0
0
Station (m)
aflu_final
Plan: Plan 01
11-01-2010
.03
.03
61.5
Legend
EG PF 1
61.0
Elevation (m)
Crit PF 1
60.5
WS PF 1
Ground
60.0
Bank Sta
59.5
59.0
58.5
0
Station (m)
aflu_final
Plan: Plan 01
11-01-2010
.03
.03
58.5
Legend
EG PF 1
58.0
Elevation (m)
Crit PF 1
WS PF 1
57.5
Ground
Bank Sta
57.0
56.5
56.0
0
3
Station (m)
aflu_final
Plan: Plan 01
11-01-2010
.03
.03
57.5
Legend
EG PF 1
Elevation (m)
57.0
Crit PF 1
WS PF 1
Ground
56.5
Bank Sta
56.0
55.5
0
Station (m)
aflu_final
Plan: Plan 01
11-01-2010
.03
.03
57.0
Legend
EG PF 1
Elevation (m)
56.5
WS PF 1
Crit PF 1
Ground
56.0
Bank Sta
55.5
55.0
0
Station (m)
aflu_final
Plan: Plan 01
11-01-2010
.03
.03
56.0
Legend
EG PF 1
Elevation (m)
55.5
WS PF 1
Crit PF 1
Ground
55.0
Bank Sta
54.5
54.0
0
4
Station (m)
aflu_final
Geom: aflu
Plan: Plan 01
11-01-2010
aflu aflu
66
Legend
EG PF 1
WS PF 1
64
Crit PF 1
Ground
Elevation (m)
62
60
58
56
54
52
0
50
100
150
200
250
300
350
W.S. Elev
(m)
Crit W.S.
(m)
E.G. Elev
(m)
E.G. Slope
(m/m)
Vel Chnl
(m/s)
Flow Area
(m2)
Top Width
(m)
Froude # Chl
aflu
aflu
aflu
aflu
66.51
60.27
58.25
57.00
PF 1
PF 1
PF 1
PF 1
2.50
2.50
2.50
3.30
64.30
58.70
56.45
55.50
65.30
59.35
57.42
56.49
65.30
59.70
57.45
56.54
65.80
60.66
57.74
56.83
0.047162
0.103963
0.015891
0.024352
3.14
5.40
2.76
2.80
0.80
0.55
1.10
1.30
0.80
1.47
1.93
2.34
1.00
2.13
0.89
0.90
aflu
aflu
56.99
56
PF 1
PF 1
3.30
3.30
55.00
54.00
56.18
55.04
56.04
55.04
56.36
55.33
0.010272
0.019153
2.05
2.57
1.77
1.42
2.56
2.39
0.60
0.80
TECHNOEDIF ENGENHARIA, SA
IMPTECG01/Rev.0
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
69.0
Legend
EG PF 1
68.5
Elevation (m)
WS PF 1
68.0
Crit PF 1
Ground
67.5
Bank Sta
67.0
66.5
66.0
0
10
15
20
25
30
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
68.0
Legend
EG PF 1
67.5
Elevation (m)
WS PF 1
67.0
Crit PF 1
Ground
66.5
Bank Sta
66.0
65.5
65.0
6
10
12
14
16
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
74
Legend
EG PF 1
Elevation (m)
72
Crit PF 1
WS PF 1
70
Ground
Bank Sta
68
66
64
0
10
15
20
25
30
35
40
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
65.0
Legend
64.5
EG PF 1
64.0
WS PF 1
Elevation (m)
Crit PF 1
Ground
63.5
Bank Sta
63.0
62.5
62.0
0
10
20
30
Station (m)
40
50
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
63.5
Legend
EG PF 1
Elevation (m)
63.0
Crit PF 1
WS PF 1
62.5
Ground
Bank Sta
62.0
61.5
61.0
4
10
12
14
16
18
20
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
63.0
Legend
EG PF 1
62.5
Elevation (m)
Crit PF 1
62.0
WS PF 1
Ground
61.5
Bank Sta
61.0
60.5
60.0
6
10
12
14
16
18
20
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
62.5
Legend
62.0
EG PF 1
61.5
WS PF 1
Elevation (m)
Crit PF 1
Ground
61.0
Bank Sta
60.5
60.0
59.5
6
10
12
14
16
18
20
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
63
Legend
62
EG PF 1
Crit PF 1
Elevation (m)
61
WS PF 1
60
Ground
Bank Sta
59
58
57
56
0
10
15
Station (m)
20
25
30
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
62
Legend
61
EG PF 1
60
WS PF 1
Elevation (m)
Crit PF 1
Ground
59
Bank Sta
58
57
56
0
10
15
20
25
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
62
Legend
EG PF 1
Elevation (m)
60
Crit PF 1
WS PF 1
Ground
58
Bank Sta
56
54
0
10
15
20
25
30
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
57
Legend
EG PF 1
Elevation (m)
56
Crit PF 1
WS PF 1
55
Ground
Bank Sta
54
53
52
0
10
15
20
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
55.5
Legend
55.0
EG PF 1
Crit PF 1
Elevation (m)
54.5
WS PF 1
54.0
Ground
Bank Sta
53.5
53.0
52.5
52.0
0
10
15
Station (m)
20
25
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
54
Legend
EG PF 1
Elevation (m)
53
Crit PF 1
WS PF 1
52
Ground
Bank Sta
51
50
49
0
10
12
14
16
18
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
50.0
Legend
EG PF 1
49.5
Elevation (m)
WS PF 1
49.0
Crit PF 1
Ground
48.5
Bank Sta
48.0
47.5
47.0
0
10
20
30
40
50
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
52
Legend
EG PF 1
51
Elevation (m)
WS PF 1
50
Ground
Bank Sta
49
48
47
46
0
10
20
30
40
50
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
50.0
Legend
49.5
EG PF 1
WS PF 1
Elevation (m)
49.0
Crit PF 1
48.5
Ground
Bank Sta
48.0
47.5
47.0
46.5
0
8
Station (m)
10
12
14
16
PAET2125
Plan: Plan 06
25-02-2010
.033
.033
50
Legend
EG PF 1
Elevation (m)
49
Crit PF 1
WS PF 1
Ground
48
Bank Sta
47
46
0
10
20
30
40
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
50
Legend
EG PF 1
49
Elevation (m)
Crit PF 1
48
WS PF 1
Ground
47
Bank Sta
46
45
44
0
10
20
30
40
50
60
70
80
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
45.5
Legend
45.0
EG PF 1
44.5
WS PF 1
Elevation (m)
Crit PF 1
Ground
44.0
Bank Sta
43.5
43.0
42.5
0
20
40
60
80
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
43.5
Legend
43.0
EG PF 1
42.5
WS PF 1
Elevation (m)
Crit PF 1
Ground
42.0
Bank Sta
41.5
41.0
40.5
0
8
Station (m)
10
12
14
16
PAET2125
Plan: Plan 06
25-02-2010
.033
.033
41.0
Legend
40.5
EG PF 1
40.0
WS PF 1
Elevation (m)
Crit PF 1
Ground
39.5
Bank Sta
39.0
38.5
38.0
0
10
12
14
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
40.0
Legend
EG PF 1
39.5
Elevation (m)
Crit PF 1
39.0
WS PF 1
Ground
38.5
Bank Sta
38.0
37.5
37.0
0
10
12
14
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
38.0
Legend
EG PF 1
Elevation (m)
37.5
Crit PF 1
WS PF 1
37.0
Ground
Bank Sta
36.5
36.0
35.5
4
10
12
14
16
18
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
38
Legend
EG PF 1
Elevation (m)
37
WS PF 1
Crit PF 1
36
Ground
Bank Sta
35
34
33
0
10
Station (m)
15
20
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
36.5
Legend
36.0
EG PF 1
WS PF 1
Elevation (m)
35.5
Crit PF 1
35.0
Ground
Bank Sta
34.5
34.0
33.5
33.0
0
10
12
14
16
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
Legend
35.5
EG PF 1
Crit PF 1
Elevation (m)
35.0
WS PF 1
34.5
Ground
Bank Sta
34.0
33.5
33.0
32.5
0
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
Legend
35.5
EG PF 1
Crit PF 1
Elevation (m)
35.0
WS PF 1
34.5
Ground
Bank Sta
34.0
33.5
33.0
32.5
0
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
35.5
Legend
35.0
EG PF 1
Crit PF 1
Elevation (m)
34.5
WS PF 1
34.0
Ground
Bank Sta
33.5
33.0
32.5
32.0
2
10
Station (m)
12
14
16
18
PAET2125
Plan: Plan 06
25-02-2010
.03
.033
34.0
Legend
EG PF 1
33.5
Elevation (m)
WS PF 1
33.0
Crit PF 1
Ground
32.5
Bank Sta
32.0
31.5
31.0
0
10
12
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.012
.033
34.0
Legend
EG PF 1
33.5
Elevation (m)
WS PF 1
33.0
Ground
Bank Sta
32.5
32.0
31.5
31.0
0
10
15
20
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.012
.033
33.5
Legend
EG PF 1
Elevation (m)
33.0
WS PF 1
Crit PF 1
32.5
Ground
Bank Sta
32.0
31.5
31.0
0
10
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.012
.033
33
Legend
EG PF 1
Elevation (m)
32
Crit PF 1
WS PF 1
Ground
31
Bank Sta
30
29
0
6
Station (m)
10
PAET2125
Plan: Plan 06
25-02-2010
.012
.033
31.0
Legend
30.5
EG PF 1
30.0
WS PF 1
Elevation (m)
Crit PF 1
Ground
29.5
Bank Sta
29.0
28.5
28.0
0
10
12
14
16
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.033
.033
30.0
Legend
EG PF 1
29.5
Elevation (m)
Crit PF 1
29.0
WS PF 1
Ground
28.5
Bank Sta
28.0
27.5
27.0
0
10
20
30
40
50
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.033
.033
29.0
Legend
28.5
EG PF 1
Crit PF 1
Elevation (m)
28.0
WS PF 1
27.5
Ground
Bank Sta
27.0
26.5
26.0
25.5
0
10
15
20
25
30
Station (m)
PAET2125
Plan: Plan 06
25-02-2010
.033
.033
28.0
Legend
27.5
EG PF 1
27.0
WS PF 1
Elevation (m)
Crit PF 1
Ground
26.5
Bank Sta
26.0
25.5
25.0
0
10
15
Station (m)
20
25
PAET2125
Geom: sassPAE
Plan: Plan 06
25-02-2010
70
Legend
EG PF 1
Crit PF 1
WS PF 1
60
Ground
Elevation (m)
50
40
30
20
0
200
400
600
800
1000
1200
1400
Crit W.S.
(m)
E.G. Elev
(m)
E.G. Slope
(m/m)
Vel Chnl
(m/s)
Flow Area
(m2)
Top Width
(m)
Froude # Chl
montante
montante
montante
montante
66
65.6
64
62
PF 1
PF 1
PF 1
PF 1
21.00
21.00
21.00
21.00
66.00
65.00
64.00
62.00
67.58
66.82
64.77
62.80
67.11
66.82
65.49
63.09
67.72
67.61
67.10
63.78
0.002043
0.006733
0.088992
0.027619
2.04
4.08
6.76
4.38
14.04
6.10
3.11
4.82
12.81
4.28
4.08
6.08
0.52
0.97
2.47
1.57
montante
montante
montante
montante
montante
montante
61.25
60
59.6
57
56.5
54.5
PF 1
PF 1
PF 1
PF 1
PF 1
PF 1
21.00
21.00
21.00
21.00
21.00
21.00
61.00
60.00
59.60
56.90
56.50
54.50
62.20
61.08
60.32
58.48
57.39
56.07
62.51
61.77
60.86
59.20
57.94
56.74
63.32
62.91
62.30
60.41
59.48
58.60
0.021711
0.037807
0.068126
0.027991
0.087756
0.079269
4.85
6.42
6.47
7.57
6.39
7.47
4.78
3.87
3.55
4.17
3.28
3.30
4.76
4.36
6.02
4.28
5.95
4.90
1.41
1.97
2.43
1.92
2.75
1.94
montante
montante
montante
52.5
52
49
PF 1
PF 1
PF 1
21.00
21.00
21.00
52.50
52.00
49.00
53.38
52.72
50.28
54.11
53.18
50.91
56.40
55.48
52.08
0.079859
0.143572
0.024227
8.63
8.34
6.12
3.06
3.44
3.96
4.98
12.00
4.08
2.94
3.17
1.73
montante
montante
montante
montante
montante
montante
montante
montante
47.51
47
46.75
46
44.01
42.51
40.5
38
PF 1
PF 1
PF 1
PF 1
PF 1
PF 1
PF 1
PF 1
21.00
21.00
21.00
25.00
25.00
25.00
25.00
25.00
47.00
46.75
46.75
46.00
44.00
42.50
40.50
38.00
49.69
49.62
49.00
47.22
44.50
43.19
41.11
38.77
48.24
49.00
47.70
44.99
43.50
41.51
39.00
49.71
49.70
49.53
49.10
46.53
44.23
42.45
39.61
0.000152
0.001139
0.005705
0.062295
0.106992
0.037061
0.055477
0.032100
0.75
1.46
4.32
6.22
6.31
4.51
5.13
4.06
44.92
18.77
8.48
4.51
3.96
5.54
4.87
6.16
42.30
15.67
7.29
10.17
8.00
8.00
8.00
8.00
0.15
0.28
0.92
2.03
2.86
1.73
2.10
1.48
montante
montante
37.51
36.51
PF 1
PF 1
25.00
25.00
37.20
35.50
38.13
36.18
38.20
36.49
38.71
37.25
0.014991
0.038497
3.37
4.57
7.41
5.47
8.00
8.00
1.12
1.76
montante
montante
34.01
33.91
PF 1
PF 1
25.00
25.00
33.70
33.20
34.98
34.29
34.70
34.29
35.28
34.84
0.005654
0.012455
2.45
3.28
10.20
7.61
8.00
7.00
0.69
1.01
montante
montante
montante
montante
32.70
32.58
32.51
32.01
PF 1
PF 1
PF 1
PF 1
25.00
25.00
25.00
25.00
32.70
32.58
32.40
31.40
33.44
33.32
33.09
33.27
33.72
33.60
33.41
32.39
34.41
34.30
34.19
33.41
0.005146
0.005193
0.039946
0.001817
4.36
4.38
4.66
1.67
5.73
5.71
5.37
14.97
7.70
7.70
7.80
8.00
1.61
1.62
1.79
0.39
E.G. Elev
(m)
E.G. Slope
(m/m)
Vel Chnl
(m/s)
Flow Area
(m2)
Top Width
(m)
Froude # Chl
montante
montante
montante
montante
31.01
30.51
30.01
28.01
PF 1
PF 1
PF 1
PF 1
25.00
25.00
25.00
25.00
31.20
31.00
29.00
28.15
33.32
32.61
29.77
28.70
32.61
30.46
29.25
33.39
33.31
32.91
30.88
0.000097
0.002115
0.018756
0.016672
1.16
3.77
7.96
6.55
23.42
7.42
3.46
3.84
12.00
6.22
5.50
7.50
0.25
0.95
2.90
2.83
montante
montante
montante
27.5
25.5
25
PF 1
PF 1
PF 1
25.00
25.00
25.00
27.25
25.50
25.00
29.11
27.18
25.96
29.22
27.56
26.33
29.55
28.32
27.11
0.025013
0.034076
0.032941
3.69
5.12
4.80
10.30
6.25
5.43
31.97
12.95
7.38
0.88
1.32
1.59