Addendum

Improvement/widening to two-laning with paved shoulder of Udaipur-Sabroom Section of


NH-44 in the State of Tripura under SARDP-NE Phase A
Amendment No.-1

In Schedule-A, Annex I (Schedule A) Clause 10.2 list of Slab/ Box/Arch Culverts is


replaced as below:
Location
Existing
Chainage
km

Structur
e No.

Type of
Crossing
Canal/Nala
etc.

Span
Arrangement
Nos.X (Length /
No of Pipe) m

Width
m

Remark

55+700

56/2

Drain

1x3.9

10.3

good condition

56+425

Drain

1x1.98

11.5

57+500

58/1

Drain

1x3.85

11.8

57+935

Drain

1x2.0

11.90

58+150

Drain

1x1.5

9.00

58+290

59/1

Nala

1x4.77

11.90

61+210

Drain

1x2.00

12.00

Structurally VP condition

62+510

63/1

Drain

1x1.9

8.20

Condition of culvert very


poor

62+650

63/2

Drain

1x4.1

11.90

62+780

Drain

1x1.5

12.00

62+925

Drain

1x1.5

12.30

63+050

Drain

1x1.3

12.30

good condition

64+400

Nala

1x4.04

11.90

Both side wing wall in


good condition

64+660

65/3

Nala

1x3.8

12.10

Culvert is totally blocked

65+500

Drain

1x4.5

15.20

VP condition, Pavement
crust laid over slab

16

67+560

68/1

Drain

1x4.9

11.90

17

71+120

Drain

1x3.4

11.80

18

75+025

76/1

Drain

1x4.8

11.90

77+835

78/1

Drain

1x2.1

12.00

Sl.
No.

8
9
10
11
12
13
14
15

19

Below the ground level


and also in VP condition

Left side return wall but


right side no return wall
Left side return wall but
right side no return wall

Parapet is on only one


side, RHS.

Span
Arrangement
Nos.X (Length /
1x1.5

Width
m

Type of
Crossing
Canal/Nala
Drain

80+960

Drain

1x1.5

12.00

83+200

Drain

1x1.5

11.40

83+520

Drain

1x1.8

13.20

24

83+780

Drain

1x2.1

11.30

Fair condition

25

94+660

Drain

1x4.4

10.80

Wing wall on RHS only

96+100

Drain

1x4.7

12.20

Condition fairs Both side


wing walls.

100+600

Drain

1x4.35

12.00

Slightly blocked.

108+200

Drain

1x3.8

11.90

Discontinues parapet both


side.

29

108+830

Drain

1x1.4

8.00

VP condition.

30

110+080

Drain

1x1.2

12.10

VP condition.

31

110+225

Drain

1x1.2

12.10

111+025

Drain

1x1.3

12.00

111+940

Drain

1x1.2

12.00

34

112+050

Drain

1x1.3

11.80

35

112+165

Drain

1x1.9

11.80

113+200

Drain

1x1.3

12.20

Only left side has parapet


and VP condition.

113+350

Drain

1x1.36

11.70

Blocked.

113+475

Drain

1x3.9

11.80

Discontinuous parapet on
both side

39

114+030

Drain

1x1.25

12.20

Fair condition.

40

114+150

Drain

1x1.4

12.10

41

114+650

Drain

1x1.35

12.20

42

114+820

Drain

1X1.3

12.00

43

115+110

Drain

1X1.3

12.00

44

116+100

Drain

1x1.3

11.80

45

116+730

Drain

1x1.3

12.00

Sl.
No.
20
21
22

Location
Existing
Chainage
77+900

Structur
e No.

11.90

23

26
27
28

32
33

36
37
38

Remark

VP condition, Pavement
crust laid over slab
VP condition, Parapet is
below the road level
Left side has no parapet
Only Right side has
parapet.(Damaged)

Completely buried and


Damaged.
Completely buried and
Damaged.

Only left side has parapet.

Location
Existing
Chainage

Structur
e No.

Type of
Crossing
Canal/Nala

Span
Arrangement
Nos.X (Length /

Width
m

Remark

Nala

1x5.3

11.80

Discontinuous parapet.
Left side has two
discontinuous parapets
and Right side has three.

118+260

47

118+700

Drain

1x1.25

35.00

Blocked

48

122+595

Drain

1x1.8

12.00

Fair condition.

49

123+330

Drain

1x1.3

12.00

Fair condition.

123+407

Drain

1x4.25

11.80

Discontinuous parapet
two nos. on both side.

51

123+487

Drain

1x1.4

12.00

Fair condition.

52

123+900

Drain

1x1.3

11.70

53

124+000

Drain

1x1.8

11.90

Fair condition.

124+080

Drain

1x3.6

11.90

Discontinuous parapet
two nos. on both side.

124+330

Drain

1x1.4

11.90

125+990

Drain

1x1.3

12.00

57

126+270

Drain

1x1.4

12.00

58

126+700

Drain

1x1.5

12.00

126+770

Drain

1x1.3

11.90

60

127+170

Drain

1x1.4

12.00

61

127+690

Drain

1x1.5

12.00

127+970

Drain

1x1.9

12.00

63

128+050

Drain

1x1.4

11.90

64

128+300

Drain

1x1.4

11.90

65

128+830

Drain

1x1.4

11.80

66

129+990

Drain

1x1.4

11.90

67

131+100

Drain

1x1.4

11.90

68

131+500

Drain

1x1.45

12.00

131+640

Drain

1 x 5.8

11.8

Discontinuous parapet,
Structurally VP condition

131+980

Drain

1x1.5

12.00

Blocked.

132+360

Drain

1x1.1

32.00

Slab below the ground


level, Completely buried

Sl.
No.

46

50

54
55
56

59

62

69
70
71

Right side only parapet


and totally blocked.

Structurally very poor


condition

Structurally very poor


condition

Sl.
No.
72
73

Location
Existing
Chainage
132+420

Structur
e No.

Span
Arrangement
Nos.X (Length /
1x1.3

Width
m

Remark

Type of
Crossing
Canal/Nala
Drain

32.00

Fair condition. Slightly


Blocked.

132+740

Drain

1x1.3

12.00

Slightly blocked.

Amendment No.-2

In Schedule-A, Annex I (Schedule A) Clause 15 Minor Junctions is replaced as below:


S.
No.

Location
(Km)

Remarks

Type
Leading to

T-Junction

Cross Road

55+585

Village Road

55+825

Village Road

56+175

PMGSY

56+460

Village Road

56+565

Village Road

56+930

PMGSY

57+980

Nathapara Village

Village Road

58+070

Chandrapur
Village

PMGSY

58+215

10

58+395

11

58+575

Village Road

12

58+615

Village Road

13

59+080

Village Road

14

59+615

15

60+715

16

60+880

Dataram Village

Village Road

17

61+495

Gangacheera
Village

PMGSY

18

62+365

19

62+400

Nintila Village

Village Road

20

63+900

Sukanchari

PMGSY

21

64+350

Kalabandha

PMGSY

22

64+500

Village Road

23

66+970

Village Road

24

69+475

Village Road

25

69+840

Village Road
Village Road

Village Road

Holakhat

Village Road
Village Road

Village Road

Southern
Bagadad
5

Village Road

S.
No.

Location
(Km)

26

Remarks

Type
Leading to

T-Junction

Cross Road

70+100

Garo Colony

Village Road

27

70+225

Takama Village

PMGSY

28

71+400

PMGSY

29

71+880

Village Road

30

72+540

31

73+120

32

75+375

33

77+250

ODR

34

78+690

Village Road

35

79+630

Village Road

36

83+760

SH

37

83+875

MDR

38

88+345

PMGSY

39

89+245

Village Road

40

90+300

SH

41

90+565

Laxmisara

MDR

42

90+705

Jagannathpada

MDR

43

92+030

Latuatila Village

Village Road

44

92+600

45

93+750

Magpara Village

Village Road

46

93+830

Kalishimukha
Village

Village Road

47

94+135

PMGSY

48

95+475

PMGSY

49

100+300

Pillak

Village Road

50

100+560

Shyam
Sundapara

Village Road

51

100+625

Debdaru Village

Village Road

52

101+015

53

108+475

Bilonia

Village Road
MDR

Suntampara
Village

Village Road

Village Road

Village Road
Sudho Sad Bari
Village
6

Village Road

S.
No.

Location
(Km)

54

Remarks

Type
Leading to

T-Junction

Cross Road

110+295

High School

Village Road

55

111+255

Kalachhora
Village

Village Road

56

112+265

Maira Village

Village Road

57

112+640

Kali Mandir

Village Road

58

112+820

59

113+040

60

118+625

Village Road

61

119+035

Village Road

62

119+500

Village Road

63

119+555

Village Road

64

119+890

Village Road

65

120+315

Manughat

Village Road

66

121+180

Magurcher

Village Road

67

122+260

Banikpara

Village Road

68

126+260

69

129+610

Village Road
Kalachhera
Village

PMGSY

Village Road

X
-

70

130+665

Village Road
-

PMGSY

71

133+500

Village Road

X
-

Police Station

Village Road

172 Batalian
(BSF)

Village Road

Amendment 3
In Schedule-A, Annex II (Schedule A) Dates for providing Right of Way is replaced as
below:
Annex II
(Schedule-A)
Dates for providing Right of Way
The dates on which the Authority shall provide Right of Way to the Contractor on different parts
of the Site are stated below:
S. No.

1
(i) Full Right of Way
(full width)
(a) Stretch
(b) Stretch
(c) Stretch

From km to
km

Length
(in Km)

Width
(m)

Date of
providing
ROW*
5

Excluding
Bypass &
Realignments

40.697

As per
Existing
ROW

Bypasses/
Realignment

32.460

45m

31st March 2014

4-Lane Stretch

0.555**

As per
Existing
ROW

At appointed
date

At appointed
date

(ii) Balance Right of way


(Width)
(a) Stretch
(b) Stretch
(c) Stretch
(iii) Balance Right of way
(Width)
(a) Stretch
(b) Stretch
(c) Stretch

*The dates specified herein shall in no case be beyond 150 (one hundred and fifty) days the
Appointed Date.
**4-lane stretch shall be overlay and strengthen.
Design Chainage in km
From

To

88+370
114+475

88+700
114+700

Total Length in km
8

Length in
km
0.330
0.225
0.555

Amendment 4
In Schedule-B is replaced as below:
Schedule B
(See Clause 2.1)
Development of the Project Highway
1

Development of the Project Highway


Development of the Project Highway shall include design and construction of the Project
Highway as described in this Schedule-B and in Schedule-C.

Rehabilitation and augmentation


Rehabilitation and augmentation shall include Two-Laning with paved shoulders and
strengthening of the Project Highway as described in Annex-I of this Schedule-B and in
Schedule-C.

Specifications and Standards


The Project Highway shall be designed and constructed in conformity with the
Specifications and Standards specified in Annex-I of Schedule-D.

Annex I
(Schedule-B)
Description of Two-Laning with paved shoulders and strengthening
1. Widening of the Existing Highway
1.1 The Project Highway shall follow the existing alignment unless otherwise specified by
the Authority and shown in the alignment plans specified in Annex III of Schedule-A.
Geometric deficiencies, if any, in the existing horizontal and vertical profiles shall be
corrected as per the prescribed standards for plain/rolling terrain to the extent land is
available.
Widening of the existing intermediate (5.5m) highway to two lane with paved shoulders
from km 55.000 (Udaipur) to km 128.712 (at Sabroom).
1.2 Width of carriageway
1.2.1Two-Laning with paved shoulders shall be undertaken. The paved carriageway shall be
10 (ten) metre wide in accordance with the typical cross sections drawings in the Manual
except at design km 88.370 to km 88.700 and design km 114.475 to km 114.700
(existing 4-lane section).
Existing 4-lane section from km 88.370 to km 88.700 and km 114.475 to km 114.700
shall be overlay and strengthen as per manual and MoRTH specifications.
Provided that in the built-up areas [refer to paragraphs 2.1 (ii) (a) of the Manual and
provide necessary details]: the width of the carriageway shall be as specified in the
following table:
Sl.
No.

Built-up stretch
(Township)

Location
(km to km)

Width

Typical cross section


(Ref. to Manual)

Nil
1.2.2Except as otherwise provided in this Agreement, the width of the paved carriageway
and cross-sectional features shall conform to paragraph 1.1 above.
1.2.3 Design Chainage corresponding to Existing Chainage
Kilometre stones are existing in entire length of the project highway. It is called the
Existing Chainage. During topography survey with Total Station, observations are
made to these Km stones and after finalization of alignment by improving the existing
geometry the chainage has been referred to Design Chainage. The relationship
between the Existing Chainage and the Design Chainage as per field surveys of the
location of existing Km stones using the total station for the Project Highway is given
below.
10

Sl.
No.

Existing Km

Design Ch.

1
2
3
4
5

56.000
57.000
58.000
59.000
60.000

55+415
56+422
57+365
58+355
59+365

6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

61.000
62.000
63.000
64.000
65.000
66.000
67.000
68.000
69.000
70.000
71.000
72.000
73.000
74.000
75.000
76.000
77.000
78.000
79.000
80.000
81.000
82.000
83.000
84.000
85.000
86.000
87.000
88.000
89.000
90.000
91.000
92.000

60+348
61+610
62+318
63+318
64+315
65+315
66+315
67+225
68+220
69+185
70+160
71+123
72+185
Realignment
73+895
74+855
75+845
Realignment
77+500
78+470
Bypass
Bypass
81+190
82+215
Realignment
Realignment
84+565
Realignment
86+235
87+235
88+135
89+200

Sl.
No.

11

Existing Km

Design Ch.

40
41
42
43
44

95.000
96.000
97.000
98.000
99.000

91+975
92+970
93+900
94+800
Bypass

45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

100.000
101.000
102.000
103.000
104.000
105.000
106.000
107.000
108.000
109.000
110.000
111.000
112.000
113.000
114.000
115.000
116.000
117.000
118.000
119.000
120.000
121.000
122.000
123.000
124.000
125.000
126.000
127.000
128.000
129.000
130.000
131.000

96+900
97+830
98+855
99+800
100+830
101+700
102+660
103+600
104+450
105+515
106+435
107+400
108+330
109+290
110+200
111+170
112+170
Realignment
113+870
114+790
115+760
116+730
117+670
Realignment
119+500
120+500
121+400
122+335
123+325
124+260
125+180
126+100

Sl.
No.

Existing Km

Design Ch.

93.000
94.000

90+185
91+095

38
39

Sl.
No.

Existing Km

Design Ch.

132.000

127+000

77

2.

Geometric Design and General Features

2.1

General
Geometric design and general features of the Project Highway shall be in accordance
with Section-2 of the Manual.

2.2

Design Speed
The design speed shall be the minimum design speed of 80 km per hr for plain/rolling
terrain. However, keeping in view the poor geometry of the existing road and the
resulting land acquisition that would be needed to upgrade the project road to a design
speed of 80 km/hr, design speed was restricted to 60km/hr at many locations. The ROW
for the project corridor will be acquired based on minimum 60km/hr speed horizontal
alignment, subjected to a minimum width of 45 m.

2.3

Improvement of the existing Road Geometrics


As per the alignment in Plan and Profile enclosed, where improvement of the existing
road geometrics to the prescribed standards is not possible, the existing road geometrics
shall be improved to the extent possible within the given right of way and proper road
signs and safety measures shall be provided.

2.3.1

Details of Bypasses/Realignments
Four Bypasses shall be constructed on the Project Highway, as per details given below:

Location of
Bypass

Existing Chainage
(km)

Existing
Length

Design Chainage
(km)

Proposed
Length

From

To

(Km)

From

To

(Km)

Bagafa

80+200

83+000

2.800

78+660

81+235

2.575

Jolaibari

98+150

99+810

1.660

94+930

96+700

1.770

Total Length (km)

4.345

Realignments Location shall be constructed on the project highway, as per details given below:

12

Existing Chainage (km)


From

To

57+080
59+505
59+930
60+520
61+550
62+660
64+040
66+460
67+460
68+290
69+350
69+900
71+770
72+625
73+070
73+570
74+395
74+725
75+480
75+900
76+520
77+120
79+260
79+710
84+660
85+900
86+460
87+575
88+680
89+150
89+760
90+340
92+700
93+715
94+260
94+970

57+280
59+605
60+105
60+860
61+715
63+100
64+250
66+600
67+715
68+570
69+610
70+043
71+980
72+920
73+440
74+310
74+540
74+870
75+570
76+000
76+760
78+350
79+560
80+070
85+390
86+360
87+240
88+250
88+830
89+300
90+120
90+690
93+590
94+130
94+770
95+245

Design Chainage(Km)

Existing
Length (Km)
0.200
0.100
0.175
0.340
0.165
0.440
0.210
0.140
0.255
0.280
0.260
0.143
0.210
0.295
0.370
0.740
0.145
0.145
0.090
0.100
0.240
1.230
0.300
0.360
0.730
0.460
0.780
0.675
0.150
0.150
0.360
0.350
0.890
0.415
0.510
0.275
13

From

To

56+500
58+860
59+300
59+880
60+865
62+020
63+375
65+760
66+760
67+530
68+570
69+100
70+900
71+750
72+250
72+720
73+270
73+630
74+380
74+770
75+370
75+950
77+760
78+200
82+660
83+680
84+050
85+100
85+920
86+400
87+040
87+580
89+900
90+840
91+330
91+940

56+660
58+940
59+470
60+200
61+025
62+420
63+580
65+900
66+940
67+800
68+830
69+220
71+100
72+120
72+600
73+170
73+440
73+770
74+450
74+860
75+600
76+870
78+040
78+530
83+120
83+940
84+740
85+550
86+060
86+530
87+350
87+830
90+680
91+200
91+750
92+210

Design
Length (Km)
0.160
0.080
0.170
0.320
0.160
0.400
0.205
0.140
0.180
0.270
0.260
0.120
0.200
0.370
0.350
0.450
0.170
0.140
0.070
0.090
0.230
0.920
0.280
0.330
0.460
0.260
0.690
0.450
0.140
0.130
0.310
0.250
0.780
0.360
0.420
0.270

Existing Chainage (km)


From

To

95+390
95+470
96+130
96+730
96+940
97+570
100+700
101+540
101+800
102+320
103+500
104+130
105+030
105+760
106+710
107+150
109+170
109+410
109+645
110+070
110+570
110+800
111+410
111+840
112+740
113+205
113+950
115+330
115+750
116+230
116+700
118+000
118+500
119+870
120+185
120+490

95+470
95+500
96+560
96+800
97+360
98+040
101+050
101+670
102+015
102+520
103+980
104+560
105+460
106+250
107+020
108+885
109+250
109+480
109+965
110+390
110+700
111+180
111+640
112+420
113+070
113+700
114+350
115+650
116+090
116+460
117+850
118+180
118+675
120+100
120+350
120+870

Design Chainage(Km)

Existing
Length (Km)
0.080
0.030
0.430
0.070
0.420
0.470
0.350
0.130
0.215
0.200
0.480
0.430
0.430
0.490
0.310
1.735
0.080
0.070
0.320
0.320
0.130
0.380
0.230
0.580
0.330
0.495
0.400
0.320
0.340
0.230
1.150
0.180
0.175
0.230
0.165
0.380
14

From

To

92+355
92+435
93+100
93+640
93+840
94+400
97+600
98+375
98+630
99+175
100+340
100+955
101+730
102+425
103+350
103+765
105+680
105+915
106+120
106+500
106+970
107+200
107+800
108+200
109+040
109+500
110+160
111+500
111+900
112+400
112+850
113+865
114+360
115+650
115+915
116+230

92+435
92+470
93+470
93+700
94+120
94+820
97+880
98+500
98+870
99+330
100+800
101+250
102+130
102+900
103+630
105+400
105+760
105+980
106+390
106+770
107+100
107+570
108+000
108+700
109+360
109+900
110+500
111+800
112+250
112+630
113+710
114+040
114+475
115+840
116+080
116+600

Design
Length (Km)
0.080
0.035
0.370
0.060
0.280
0.420
0.280
0.125
0.240
0.155
0.460
0.295
0.400
0.475
0.280
1.635
0.080
0.065
0.270
0.270
0.130
0.370
0.200
0.500
0.320
0.400
0.340
0.300
0.350
0.230
0.860
0.175
0.115
0.190
0.165
0.370

Existing Chainage (km)

2.4

From

To

121+030
121+200
121+630
122+365
122+850
123+790
124+680
126+450
128+080
129+100
130+160
130+570
130+775
131+310
131+920

121+110
121+335
122+220
122+465
123+090
123+960
126+080
126+860
128+620
129+950
130+470
130+670
131+055
131+650
132+835

Design Chainage(Km)

Existing
Length (Km)
0.080
0.135
0.590
0.100
0.240
0.170
1.400
0.410
0.540
0.850
0.310
0.100
0.280
0.340
0.915

Design
Length (Km)

From

To

116+760
116+915
117+340
118+000
118+425
119+300
120+200
121+840
123+400
124+350
125+340
125+670
125+875
126+400
126+930

116+830
117+030
117+850
118+100
118+600
119+470
121+470
122+180
123+870
125+125
125+570
125+770
126+145
126+650
127+775

0.070
0.115
0.510
0.100
0.175
0.170
1.270
0.340
0.470
0.775
0.230
0.100
0.270
0.250
0.845

Right of Way
The details of the proposed Right of Way are given in below:
Existing Chainage
(km )

2.5

Design Chainage
(km)

Proposed
ROW (m)

From

To

From

To

55+600

80+200

55+000

78+660

80+200

83+000

78+660

81+235

45

83+000

98+150

81+235

96+700

45

98+150

99+810

94+930

96+700

45

99+810

133+800

96+700

128+712

45

Remarks

45
Bagafa bypass

Jolaibari Bypass

Type of Shoulders
(a) In open country, paved shoulders of 1.5m wide shall be provided and balance 1.0m
width shall be covered with150 mm thick compacted layer of granular material.
(b) Design and specifications of paved shoulders and granular material shall conform to
15

the requirement specified in paragraphs 5.9.9 and 5.9.10 of the Manual.


2.6

Lateral and Vertical Clearances at Underpasses


2.6.1

Lateral and vertical clearances at underpasses and provision of guardrails/crash


barriers shall be as per the paragraph 2.11 of the Manual.

2.7.2

Lateral clearance: The width of the opening at the underpasses shall be as


follows:
Nil

2.7

Lateral and vertical clearance at overpasses


2.7.1

Lateral and vertical clearances at over passes shall be as per paragraph 2.12 of
the Manual.

2.7.2

Lateral clearance: The size of the opening at the overpasses shall be as follows:
Nil

2.8

Service roads/ Slip Road


Service roads shall be constructed at the locations and for the lengths indicated below:
Sl.
No.

Description

Design
Chainage

Right hand side


(RHS)/Left hand
side (LHS)/ or Both
sides

Length (km) of service


road (Both sides)

Nil

2.9 Grade separated structures


2.9.1 Grade separated structures shall be provided as per paragraph 2.14 of the Manual. The
requisite particulars are given below:
S. No.

Location of
Structure

Length (m)

Number and
length of spans

Approach gradient

Nil

2.9.2 In the case of grade separated structures, the type of structure and the level of the Project
Highway and the cross roads shall be as follows: Refer to paragraphs 2.14.2 of the
Manual and specify the type of vehicular under pass / over pass structure and whether
the cross road is to be carried at the existing level, raised or lowered.

16

Sl.
No.

Location

Type of structure
Length (m)

Cross road at
Existing level

Raised Level

Lowered Level

Nil

2.10

Cattle and Pedestrian Underpass/Overpass


Cattle and pedestrian underpass/overpass shall be constructed as follows: refer to
paragraph 2.14.3 of the Manual and specify the requirement of cattle and pedestrian
underpass/overpass.
Design
Chainage
(km)

Sl.
No.

Existing
Chainage (km)

Span (No. x
length x ht.)

Type of
Crossing

Nil
2.11 Typical cross-sections of the Project Highway
Different type of cross sections for different segments of Two Lane with paved shoulders
stretch shall be developed as provided in Manual of Specifications & Standard for Two
Laning of Highways through Public Private Partnership (IRC: SP: 73-2007) referred in
Schedule D.
3 Intersections and grade separators
All intersections and grade separators shall be as per Section 3 of the Manual. Existing
intersections which are deficient shall be improved to the prescribed standards.
Properly designed intersections shall be provided at the locations and of types and
features given in the tables below:
(a) At-grade intersections
i) Major Junction
Sl.
No

Location
Chainage
(km)

1
2

Type of
intersection

Cross Road
Side

Leading to

Width
(m)

72+535

RHS

Belonia

7.00

83+010

RHS

Belonia

7.00

ii) Minor Junctions

17

S.
No.

Details of Cross Roads/ Junction


Leading to

Location
(Km)

Design
km

Road No/ Type

Width
(m)

Side

55+585

55+000

Village Road

6.50

LHS

55+825

55+240

Village Road

3.60

LHS

56+175

55+590

PMGSY

3.00

RHS

56+460

55+875

Village Road

4.50

LHS

56+565

55+980

Village Road

4.50

RHS

56+930

56+360

PMGSY

8.00

RHS

57+980

57+345

Village Road

3.50

LHS

58+070

57+435

PMGSY

3.50

LHS

58+215

57+580

Village Road

6.00

LHS

10

58+395

57+770

Village Road

4.50

LHS

4.50

RHS

11

58+575

57+960

Village Road

4.00

LHS

12

58+615

58+000

Village Road

5.50

LHS

13

59+080

58+435

Village Road

4.50

RHS

14

59+615

58+970

Village Road

4.00

RHS

15

60+715

60+075

Village Road

3.00

RHS

16

60+880

60+225

Village Road

4.50

LHS

17

61+495

60+845

PMGSY

6.00

RHS

18

62+365

61+665

Village Road

4.00

LHS

19

62+400

61+700

Village Road

3.50

RHS

Nintila Village

20

63+900

63+215

PMGSY

7.50

LHS

Sukanchari

21

64+350

63+650

PMGSY

6.70

RHS

Kalabandha

22

64+500

63+800

Village Road

5.00

RHS

23

66+970

66+285

Village Road

5.00

LHS

24

69+475

68+700

Village Road

5.50

LHS

25

69+840

69+025

Village Road

3.50

RHS

Southern
Bagadad

26

70+100

69+280

Village Road

4.20

RHS

Garo Colony

27

70+225

69+410

PMGSY

4.00

LHS

Takama Village

28

71+400

70+500

PMGSY

3.00

RHS

18

Nathapara
Village
Chandrapur
Village

Holakhat
Dataram
Village
Gangacheera
Village

S.
No.

Details of Cross Roads/ Junction


Leading to

Location
(Km)

Design
km

Road No/ Type

Width
(m)

Side

29

71+880

71+000

Village Road

3.00

LHS

30

72+540

71+675

Village Road

5.50

RHS

31

73+120

72+300

MDR

3.00

RHS

32

75+375

74+275

Village Road

5.00

LHS

33

77+250

76+100

ODR

3.00

LHS

34

78+690

77+180

Village Road

3.00

LHS

35

79+630

78+075

Village Road

4.00

RHS

36

83+760

81+770

SH

3.00

RHS

37

83+875

81+890

MDR

3.00

RHS

38

88+345

85+700

PMGSY

3.50

RHS

39

89+245

86+485

Village Road

3.00

RHS

40

90+300

87+540

SH

3.00

RHS

41

90+565

87+680

MDR

3.00

LHS

Laxmisara

42

90+705

87+840

MDR

3.00

RHS

Jagannathpada

43

92+030

89+225

Village Road

7.50

RHS

Latuatila
Village

44

92+600

89+800

Village Road

6.40

LHS

45

93+750

90+815

Village Road

3.75

RHS

46

93+830

90+930

Village Road

3.80

LHS

47

94+135

91+220

PMGSY

4.50

RHS

48

95+475

92+425

PMGSY

3.50

RHS

49

100+300

97+125

Village Road

4.20

RHS

50

100+560

97+385

Village Road

4.75

RHS

51

100+625

97+450

Village Road

5.00

LHS

52

101+015

97+840

Village Road

5.00

LHS

53

108+475

104+980

Village Road

6.50

RHS

Sudho Sad Bari


Village

54

110+295

106+720

Village Road

3.50

LHS

High School

55

111+255

107+655

Village Road

3.20

RHS

Kalachhora
Village

56

112+265

108+590

Village Road

4.20

LHS

Maira Village

19

Bilonia
Suntampara
Village

Magpara
Village
Kalishimukha
Village

Pillak
Shyam
Sundapara
Debdaru
Village

S.
No.

Details of Cross Roads/ Junction


Leading to

Location
(Km)

Design
km

Road No/ Type

Width
(m)

Side

57

112+640

108+925

Village Road

7.50

RHS

58

112+820

109+100

Village Road

3.50

LHS

59

113+040

109+335

Village Road

5.20

LHS

60

118+625

114+385

Village Road

4.50

RHS

61

119+035

114+820

Village Road

3.20

RHS

62

119+500

115+235

Village Road

3.50

LHS

63

119+555

115+300

Village Road

3.50

RHS

64

119+890

115+660

Village Road

4.00

RHS

65

120+315

116+090

Village Road

4.50

RHS

Manughat

66

121+180

116+910

Village Road

3.50

LHS

Magurcher

67

122+260

117+870

Village Road

3.50

LHS

Banikpara

68

126+260

121+650

PMGSY

3.60

LHS

69

129+610

124+790

Village Road

4.00

LHS

Village Road

3.50

RHS

70

130+665

125+865

PMGSY

4.35

RHS

Village Road

5.50

LHS

Police Station

71

133+500

128+712

Village Road

5.50

RHS

172 Batalian
(BSF)

Kali Mandir
Kalachhera
Village

(b) Grade separated intersection without ramps


Sl. No.

Location

Salient
features

Minimum length
of viaduct to be
provided

Road to be carried
over/under the
structures

Nil

4.

Road embankment and cut section

4.1

Widening and improvement of the existing road embankment/cuttings and construction


of new road embankment/cuttings shall conform to the standards and specifications
given in Section 4 of the Manual and the specified cross sectional details. Deficiencies
in the plan and profile of the existing road shall be corrected.

4.2

Raising of the existing road refer to paragraph 4.2.2 of the Manual and specify sections
to be raised. Details provided as per Alignment Plan & profile.
20

Pavement design

5.1

Pavement design shall be carried out in accordance with Section-5 of the Manual.

5.2

Type of pavement
The entire project corridor has been proposed is Flexible pavement type.

5.3

Design requirements
Refer to paragraph of 5.4, 5.9 and 5.10 of the Manual of standard & Specifications.

5.3.1 Design Period and Strategy


Flexible pavement for new pavement or for widening and strengthening of the existing
pavement shall be designed for a minimum design period of 15 years.
5.3.2 Design Traffic
Notwithstanding anything to the contrary contained in this Agreement or the Manual, the
contractor shall design the pavement for design traffic of not less than 10 million
standard axles (msa) from design km 55.000 to km 128.712.
5.4

Reconstruction of stretches
The trial pit investigation reveals that the existing pavement consists of a top bituminous
layer laid over a base layer of Jhama bricks with presence of more than one alternate
layers of bituminous and brick material at few places. There is no drainage layer in the
existing pavement and hence keeping in view of the high rainfall intensity in the project
corridor, only bituminous overlay may not prove to be sufficient for durability of the
pavement. Accordingly, reconstruction is proposed for the entire stretch with new flexible
pavement using the existing pavement as sub-grade after dismantling the bituminous
layer for full stretch.

6.

Roadside drainage
Drainage system including surface and subsurface drains for the Project Highway shall
be provided as per section 6 of the Manual. Providing and constructing lined drains and
open V-type drain at hill side i.e. 250m line and 25347m V-type respectively.

7.

Design of structures

7.1

General

7.1.1

All bridges, culverts and structures shall be designed and constructed in accordance
with Section 7 of the Manual and shall conform to the cross-sectional features and other
details specified therein.
21

7.1.2

Width of the carriageway of new bridges and structures shall be as follows:


All new structures more than 60m length shall have minimum carriageway shall be as
per Manual of Fig. 7.2 (plain/rolling terrain upto 60m length) and Fig. 7.4 (Built-up area).

7.1.3 The following structures shall be provided with footpaths:


S. No.

Utility service to be
Remarks
carried
All New Bridges in built-up area shall have provisions for footpath
Bridge at km

7.1.4

All bridges shall be high-level bridges

7.1.5

Utility services to be carried over the structures


The following structures shall be designed to carry utility services specified in the table
below:
S. No.

Utility service to be
carried

Bridge at km

Remarks

All New Bridges shall have provisions for utility services to be carried over

7.1.6

Cross-section of the new culverts at deck level for the Project Highway shall conform to
the typical cross-sections given in section 7 of the Manual.
Cross-section of the new Major and Minor Bridges at deck level for the project highway
shall be confirm to the typical cross-section as per Ministry circular No.
RW/NH/33044/2/88-S&R (B) dated 24th March 2009.

7.2

Culverts

7.2.1

Overall width of all culverts shall be equal to the roadway width of the approaches.

7.2.2

Reconstruction of existing culverts:


The existing culverts at the following locations shall be re-constructed as new culverts:
Sl.
No.

Existing
Chainage

Design
Chainage

Proposed
Type of
Culvert

Span Arrangement_
Nos. X (Length / No
of Pipe) in m

Over all
width in m

58+150

57+505

Box

1 x 1.5

12

58+725

58+065

Box

1 x 1.5

12

22

7.2.3

Sl.
No.

Existing
Chainage

Design
Chainage

Proposed
Type of
Culvert

Span Arrangement_
Nos. X (Length / No
of Pipe) in m

Over all
width in m

61+210

60+460

Box

1 x 2.0

12

61+550

60+888

Box

1 x 1.5

12

62+510

61+840

Box

1 x 1.9

12

62+780

62+100

Box

1 x 1.5

12

64+660

63+967

Box

1 x 3.8

12

64+770

64+104

Box

1 x 3.0

12

65+500

64+830

Box

1 x 4.5

12

10

69+300

68+492

Box

1 x 2.5

12

11

95+375

92+287

Box

1 x 1.5

12

12

96+100

93+060

Box

1 x 5.0

12

13

105+500

102+210

Box

1 x 1.5

12

14

106+500

103+200

Box

1 x 1.5

12

15

108+830

105+340

Box

1 x 1.5

12

16

111+025

107+430

Box

1 x 1.5

12

17

111+940

108+280

Box

1 x 1.5

12

18

123+625

119+135

Box

1 x 1.5

12

19

127+740

123+060

Box

1 x 1.5

12

20

127+970

123+290

Box

1 x 1.9

12

21

128+050

123+385

Box

1 x 1.4

12

22

131+640

126+660

Box

1 x 5.8

12

Widening/ Repairs and Rehabilitation of existing culverts


All existing culverts which are not to be reconstructed shall be widened to the roadway
width of the Project Highway as per the typical cross section given in section 7 of the
23

Manual. Widening/ Repairs and strengthening of existing structures where required


shall be carried out.
Sl.
No.

Existing
Chainage

Design
Chainage

Type of
Culvert

Existing Span
Arrangement
Nos. x (Length /
Dia of Pipe) in m

55+700

55+117

Slab

1 x 3.9

Widening &
Rehabilitation

12

1
2

56+425

55+820

Slab

1 x 1.98

Repair & Rehabilitation

12

57+500

56+995

Slab

1 x 3.85

Repair & Rehabilitation

12
12

Recommendation for
culverts

Width
in m

57+935

57+300

Slab

1 x 2.0

Widening &
Rehabilitation

58+290

57+650

Slab

1 x 4.77

Repair & Rehabilitation

12

61+460

60+812

Pipe

7 x 1.2

Repair & Rehabilitation

12

62+650

61+977

Slab

1 x 4.1

Widening &
Rehabilitation

12

7
8

64+400

63+670

Slab

1 x 4.04

Repair & Rehabilitation

12

66+075

65+370

Pipe

6 x 1.2

Repair & Rehabilitation

12

10

66+150

65+445

Pipe

3 x 1.2

Repair & Rehabilitation

12

11

71+050

70+207

Slab

1 x 3.4

Repair & Rehabilitation

12

12

75+025

73+920

Slab

1 x 4.8

Repair & Rehabilitation

12

83+520

81+610

Slab

1 x 1.8

Widening &
Rehabilitation

12

13
14

83+780

81+805

Slab

1 x 2.1

Repair & Rehabilitation

12

15

84+100

82+113

Pipe

7 x 1.2

Repair &Rehabilitation

12

16

91+425

88+405

Pipe

9 x 1.2

Repair & Rehabilitation

12

17

100+600

97+510

Slab

1 x 4.35

Repair & Rehabilitation

12

18

106+550

103+250

Pipe

4 x 1.2

Repair & Rehabilitation

12

24

Sl.
No.

Existing
Chainage

Design
Chainage

Type of
Culvert

Existing Span
Arrangement
Nos. x (Length /
Dia of Pipe) in m

19

114+650

110+800

Slab

1 x 1.35

Repair &Rehabilitation

12

20

114+820

111+035

Slab

1 x 1.3

Repair &Rehabilitation

12

21

115+110

111+285

Slab

1 x 1.3

Repair & Rehabilitation

12

22

116+100

112+275

Slab

1 x 1.3

Repair & Rehabilitation

12

23

116+730

112+830

Slab

1 x 1.3

Repair & Rehabilitation

12

24

118+260

114+145

Slab

1 x 5.3

Repair & Rehabilitation

12

25

118+700

114+565

Slab

1 x 1.25

Repair & Rehabilitation

12

26

123+220

118+720

Pipe

3 x 0.9

Repair & Rehabilitation

12

27

123+330

118+830

Slab

1 x 1.3

Repair &Rehabilitation

12

28

123+407

118+910

Slab

1 x 4.25

Repair & Rehabilitation

12

29

123+487

118+996

Slab

1 x 1.4

Repair & Rehabilitation

12

30

124+000

119+505

Slab

1 x 1.8

Repair & Rehabilitation

12

31

124+080

119+580

Slab

1 x 3.6

Repair &Rehabilitation

12

32

124+330

119+795

Slab

1 x 1.4

Repair & Rehabilitation

12

33

126+270

121+700

Slab

1 x 1.4

Repair & Rehabilitation

12

34

127+170

122+535

Slab

1 x 1.4

Repair & Rehabilitation

12

35

127+690

123+000

Slab

1 x 1.5

Repair & Rehabilitation

12

36

128+300

123+657

Slab

1 x 1.4

Repair & Rehabilitation

12

37

128+830

124+125

Slab

1 x 1.4

Repair & Rehabilitation

12

38

129+990

125+170

Slab

1 x 1.4

Repair & Rehabilitation

12

39

131+100

126+190

Slab

1 x 1.4

Repair & Rehabilitation

12

25

Recommendation for
culverts

Width
in m

7.2.4

Additional new culverts shall be constructed as per particulars given in the table below:
Sl.
No.

Design
Chainage

Type of
Structure

Span arrangement
Nos. X (Length / No.
of Pipe) in m

Over all
width in m

62+223

Box

1 x 1.5

12

62+365

Box

1 x 1.5

12

66+850

Box

1 x 5.0

12

67+640

Pipe

2 x 1.2

12

72+320

Pipe

2 x 1.2

12

72+760

Pipe

2 x 1.2

12

73+060

Pipe

2 x 1.2

12

81+060

Pipe

2 x 1.2

12

81+325

Box

1 x 1.5

12

10

83+820

Pipe

2 x 1.2

12

11

84+480

Pipe

2 x 1.2

12

12

90+180

Pipe

2 x 1.2

12

13

91+620

Box

1 x 4.4

12

14

94+800

Pipe

2 x 1.2

12

15

97+780

Pipe

2 x 1.2

12

16

101+100

Pipe

2 x 1.2

12

17

102+380

Pipe

2 x 1.2

12

18

104+750

Box

1 x 4.0

12

19

106+528

Box

1 x 1.5

12

20

106+650

Box

1 x 1.5

12

21

108+540

Pipe

2 x 1.2

12

26

Sl.
No.

Design
Chainage

Type of
Structure

Span arrangement
Nos. X (Length / No.
of Pipe) in m

Over all
width in m

22

109+505

Box

1 x 1.5

12

23

109+600

Box

1 x 1.5

12

24

109+850

Pipe

4 x 1.2

12

25

110+235

Box

1 x 1.5

12

26

113+660

Pipe

2 x 1.2

12

27

115+700

Pipe

2 x 1.2

12

28

116+800

Pipe

2 x 1.2

12

29

117+000

Pipe

2 x 1.2

12

30

117+410

Pipe

2 x 1.2

12

31

117+700

Pipe

2 x 1.2

12

32

117+810

Pipe

2 x 1.2

12

33

118+196

Box

1 x 2.0

12

34

119+325

Box

1 x 6.0

12

35

119+430

Box

1 x 1.3

12

36

121+300

Pipe

2 x 1.2

12

37

121+930

Pipe

2 x 1.2

12

38

122+300

Pipe

2 x 1.2

12

39

125+480

Pipe

2 x 1.2

12

40

126+430

Pipe

7 x 1.2

12

41

126+990

Box

1 x 1.5

12

42

127+445

Box

1 x 1.1

12

43

127+490

Box

1 x 1.3

12

27

7.2.5

Sl.
No.

Design
Chainage

Type of
Structure

Span arrangement
Nos. X (Length / No.
of Pipe) in m

Over all
width in m

44

127+618

Box

1 x 1.5

12

45

128+320

Pipe

2 x 1.2

12

Repairs/ replacements of railing /parapets, flooring and protection works of the existing
culverts shall be undertaken as follows:
As per site condition
Repairs/ Replacement of railings/ parapets shall be undertaken for all the retained
culverts along with repair/ construction of flooring and protection works and any other
defects noticed at the time of construction shall also be repaired.

7.2.6

Floor protection works shall be as specified in the relevant IRC Codes and Specifications

7.3

Bridges

7.3.1

Existing bridges to be re-constructed/widened /Repairs

a) Repair/Rehabilitation/Strengthening of existing major bridges


Sl.
No.

Existing
Chainage

Design
Chainage

Existing Span

Improvement
Proposal

96+835

93+775

3 span,
(25.60+25.60+25.60
=76.80)

Repair and
Rehabilitation

120+700

116+465

2 x 43.0 = 86.0

Repair and
Rehabilitation

b) Re-construction of the existing Major Bridge:


Nil
c) Repair/Strengthening of existing Minor bridges

28

Sl.
No.

Existing
Chainage
(km)

Design
Chainage

River /
Nalla

Span
Arrangeme
nt (No. x
Span) m

Total
Width
(m)

Type of Structural
Elements

Improvement
Proposal

56+870

56+300

Nalla

1 x 9.30

12

RCC Slab, Brick


masonry Abutment

Repair
and
Rehabilitation

57+765

57+160

Nalla

3 span,
(6.70+6.70+
7.00 =20.40)

12

RCC Box

Repair
and
Rehabilitation

58+790

58+120

Nalla

1 x 7.10

8.5

RCC Slab, Brick


masonry Abutment

Repair
and
Rehabilitation

60+500

59+855

Nalla

1 x 16.50

8.4

RCC Girder beam &


slab, RCC Abutment

Repair
and
Rehabilitation

62+390

61+740

Ganga
Sora
River

1 x 21.30

8.5

RCC Girder beam &


slab, RCC Abutment

Repair
and
Rehabilitation

65+750

65+045

Nalla

2 span,
(6.80+ 6.80=
13.60)

12

RCC Box

Repair
and
Rehabilitation

71+155

Nalla

2 span,
(6.60+ 6.70=
13.30)

11.9

RCC slab, RCC Pier


& Abutment

Repair
and
Rehabilitation

3 span,
(16.30+16.4
0+16.30 =
49.0)

8.6

RCC Girder beam &


slab, RCC Pier &
Abutment

Repair
and
Rehabilitation

72+025

75+320

74+235

Manu
River

77+010

75+875

Nalla

1 x 21.60

8.4

RCC Girder beam &


slab, RCC Abutment

Repair
and
Rehabilitation

10

79+140

77+650

Nalla

1 x 20.50

8.4

RCC Girder beam &


slab, RCC Abutment

Repair
and
Rehabilitation

29

Sl.
No.

Existing
Chainage
(km)

Design
Chainage

River /
Nalla

Span
Arrangeme
nt (No. x
Span) m

Total
Width
(m)

11

83+915

81+985

Nalla

3 span,
(6.70+6.50+
6.80 =20.40)

12

RCC Box

Repair
and
Rehabilitation

12

89+030

86+285

Nalla

1 x 30.90

13

Steel Through Truss,


RCC Abutment

Repair
and
Rehabilitation

Nalla

3 span,
(6.80+6.50+
7.00 =20.30)

12

RCC Box

Repair
and
Rehabilitation

12

RCC Box

Repair
and
Rehabilitation

13

89+320

86+550

Type of Structural
Elements

Improvement
Proposal

14

89+650

86+920

Nalla

3 span,
(6.90+6.30+
6.60 =
19.80)

15

91+610

88+810

Nalla

1 x 31.10

13

Steel Through Truss,


RCC Abutment

Repair
and
Rehabilitation

18

99+815

96+730

Nalla

1 x 31.00

12.2

Steel Through Truss,


RCC Abutment

Repair
and
Rehabilitation

19

100+375

97+292

River

1 x 36.00

13

Steel Through Truss,


RCC Abutment

Repair
and
Rehabilitation

20

101+450

98+296

River

1 x 21.50

12

RCC Girder beam &


slab, RCC Abutment

Repair
and
Rehabilitation

21

113+930

110+130

Nalla

1 x 6.90

12

RCC Slab, Brick


masonry Abutment

Repair
and
Rehabilitation

22

116+515

112+660

Nalla

1 x 7.20

11

RCC Slab, Brick


masonry Abutment

Repair
and
Rehabilitation

23

118+420

114+300

Nalla

1 x 36.00

12.9

Steel Through Truss,


RCC Abutment

Repair
and
Rehabilitation

30

Sl.
No.

Existing
Chainage
(km)

Design
Chainage

River /
Nalla

Span
Arrangeme
nt (No. x
Span) m

Total
Width
(m)

Type of Structural
Elements

Improvement
Proposal

24

122+725

118+335

Nala

1 x 36.00

12.9

Steel Through Truss,


RCC Abutment

Repair
and
Rehabilitation

25

124+600

120+095

Nalla

1 x 7.1

12

RCC Slab , Brick


masonry Abutment

Repair
and
Rehabilitation

26

127+040

122+410

Nalla

1 x 36.0

12.9

Steel Through Truss,


RCC Abutment

Repair
and
Rehabilitation

12

RCC Box

Repair
and
Rehabilitation

27

127+310

122+630

Nalla

3 span,
(11.10+11.1
0+11.10 =
33.30)

28

128+200

123+510

Nalla

1 x 6.1

11.8

RCC Slab , Brick


masonry Abutment

Repair
and
Rehabilitation

29

128+980

124+250

Nalla

1 x 6.8

11.9

RCC Slab , Brick


masonry Abutment

Repair
and
Rehabilitation

30

132+875

127+830

Nalla

2 span,
(6.60+6.80 =
13.40)

12.0

RCC Box

Repair and
Rehabilitation

d) Re-construction of the existing Minor Bridge:


Nil
7.3.2

Additional new bridges


New bridges at the following locations on the Project Highway shall be constructed.
Major Bridge:

Sl. No.

Design
Chainage

Span arrangement
( No. x length) in
m

Type of Structural
Elements

Over all width


in m

82+825

3 x 22.0

RCC T Beam

12.90

31

113+045

3 x 35.0

PSC Box Girder

12.90

Minor Bridge:

Sl.
No

Design
Chainage

Type of
Structural
Elements

80+583

RCC T Beam

1 x 15.0

12.90

95+065

RCC Box

2 x 6.8

12.90

99+255

PSC Box Girder

1 x 35.0

12.90

105+020

RCC Box

1 x 6.3

12.90

106+700

RCC Box

1 x 7.3

12.90

107+250

RCC Box

1 x 6.8

12.90

Span arrangement
(No. x Span) m

Over all
width in m

Note: Over all width shall be made as per Ministry circular No. RW/NH/33044/2/88S&R(B) dated 24th March 2009.
7.3.3

The railings of existing bridges shall be replaced by crash barriers at the following
locations:
As per site condition

7.3.4

Repairs/ replacements of railing/parapets of the existing bridges shall be undertaken as


follows:
S. No.

Location at km

Remarks

In all the retained bridges those are proposed for repairs and rehabilitation.
7.3.5

Drainage system for bridge decks


An effective drainage system for bridge decks shall be provided as specified in
paragraph 7.21 of the Manual.

7.3.6

Structures in marine environment


Nil

7.4

Rail-road bridges
32

7.4.1

Design, construction and detailing of ROB/RUB shall be as specified in section 7 of the


Manual.
Nil

7.4.2

Road over bridges (road over rail) shall be provided at the following level crossings.
Nil

7.4.3

Road under bridges (road under railway line) shall be provided at the following level
crossings, as per GAD drawings attached:
Road under bridges
S. No.

Location of level crossing

Number and length of span

Nil

7.5

Grade separated structures


The grade separated structures shall be provided at the locations and of the type and
length specified in paragraphs 2.9 and 3 of this Annex-I.
Nil

7.6

Repairs and strengthening of structures


The existing structures to be repaired /strengthened, and the nature and extent of
repairs / strengthening required are given below:
A Minor Bridges

Existing
Sl.
Design
Chainage
No.
Chainage
(km)
1

56+870

57+765

58+790

56+300

57+160

58+120

River /
Nalla

Span
Arrangement
(No. x Span) m

Total
Width
(m)

Type of
Structural
Elements

Improvement
Proposal
Repair and
Rehabilitation

Nalla

1 x 9.30

12

RCC Slab,
Brick masonry
Abutment

Nalla

3 span,
(6.70+6.70+7.00
=20.40)

12

RCC Box

Repair and
Rehabilitation

8.5

RCC Slab,
Brick masonry
Abutment

Repair and
Rehabilitation

Nalla

1 x 7.10

33

Existing
Sl.
Design
Chainage
No.
Chainage
(km)

60+500

River /
Nalla

Span
Arrangement
(No. x Span) m

1 x 16.50

Total
Width
(m)

Type of
Structural
Elements

Improvement
Proposal

8.4

RCC Girder
beam & slab,
RCC
Abutment

Repair and
Rehabilitation

Repair and
Rehabilitation

59+855

Nalla

1 x 21.30

8.5

RCC Girder
beam & slab,
RCC
Abutment

62+390

61+740

Ganga
Sora
River

65+750

65+045

Nalla

2 span, (6.80+
6.80= 13.60)

12

RCC Box

Repair and
Rehabilitation

72+025

71+155

Nalla

2 span, (6.60+
6.70= 13.30)

11.9

RCC slab, RCC


Pier &
Abutment

Repair and
Rehabilitation

Manu
River

3 span,
(16.30+16.40+1
6.30 = 49.0)

8.6

RCC Girder
beam & slab,
RCC Pier &
Abutment

Repair and
Rehabilitation

8.4

RCC Girder
beam & slab,
RCC
Abutment

Repair and
Rehabilitation

Repair and
Rehabilitation

10

11

12

75+320

77+010

79+140

83+915

89+030

74+235

75+875

77+650

81+985

86+285

Nalla

1 x 21.60

Nalla

1 x 20.50

8.4

RCC Girder
beam & slab,
RCC
Abutment

Nalla

3 span,
(6.70+6.50+6.80
=20.40)

12

RCC Box

Repair and
Rehabilitation
Repair and
Rehabilitation

Nalla

1 x 30.90

13

Steel Through
Truss, RCC
Abutment

12

RCC Box

Repair and
Rehabilitation

12

RCC Box

Repair and
Rehabilitation

13

89+320

86+550

Nalla

3 span,
(6.80+6.50+7.00
=20.30)

14

89+650

86+920

Nalla

3 span,
(6.90+6.30+6.60
= 19.80)
34

Existing
Sl.
Design
Chainage
No.
Chainage
(km)
15

18

19

91+610

99+815

100+375

88+810

96+730

97+292

River /
Nalla

Nalla

Nalla

River

Span
Arrangement
(No. x Span) m
1 x 31.10

1 x 31.00

1 x 36.00

Total
Width
(m)

Type of
Structural
Elements

Improvement
Proposal

13

Steel Through
Truss, RCC
Abutment

Repair and
Rehabilitation

12.2

Steel Through
Truss, RCC
Abutment

Repair and
Rehabilitation

13

Steel Through
Truss, RCC
Abutment

Repair and
Rehabilitation

Repair and
Rehabilitation

20

101+450

98+296

River

1 x 21.50

12

RCC Girder
beam & slab,
RCC
Abutment

21

113+930

110+130

Nalla

1 x 6.90

12

RCC Slab,
Brick masonry
Abutment

Repair and
Rehabilitation

11

RCC Slab,
Brick masonry
Abutment

Repair and
Rehabilitation

12.9

Steel Through
Truss, RCC
Abutment

Repair and
Rehabilitation

12.9

Steel Through
Truss, RCC
Abutment

Repair and
Rehabilitation
Repair and
Rehabilitation

22

23

24

116+515

118+420

122+725

112+660

114+300

118+335

Nalla

Nalla

Nala

1 x 7.20

1 x 36.00

1 x 36.00

25

124+600

120+095

Nalla

1 x 7.1

12

RCC Slab ,
Brick masonry
Abutment

26

127+040

122+410

Nalla

1 x 36.0

12.9

Steel Through
Truss, RCC
Abutment

Repair and
Rehabilitation

27

127+310

122+630

Nalla

3 span,
(11.10+11.10+1
1.10 = 33.30)

12

RCC Box

Repair and
Rehabilitation

28

128+200

123+510

Nalla

1 x 6.1

11.8

RCC Slab ,
Brick masonry
Abutment

Repair and
Rehabilitation

35

Existing
Sl.
Design
Chainage
No.
Chainage
(km)
29

30

128+980

132+875

124+250

127+830

River /
Nalla

Span
Arrangement
(No. x Span) m

Total
Width
(m)

Type of
Structural
Elements

Improvement
Proposal
Repair and
Rehabilitation
Repair and
Rehabilitation

Nalla

1 x 6.8

11.9

RCC Slab ,
Brick masonry
Abutment

Nalla

2 span,
(6.60+6.80 =
13.40)

12

RCC Box

B ROB / RUB
S. No.

Location of
structure (km)

Nature and extent of repairs/strengthening to


be carried out
Nil

C Overpasses/Underpasses and other structures


S. No.

Location of
structure (km)

Nature and extent of repairs/strengthening to be


carried out
Nil

7.7

List of Major Bridges and Structures


The following existing Major Bridges shall be Retain and Rehabilitation:
Sl.
No.

Existing
Chainage

Design
Chainage

Existing Span

Improvement Proposal

96+835

93+775

3 span,
(25.60+25.60+25.60
=76.80)

Repair and
Rehabilitation

120+700

116+465

2 x 43.0

Repair and
Rehabilitation

The following is the list of the New Major Bridges and Structures:
Sl. No.

Design
Chainage

Span arrangement
(No. x length) in m

Type of Structural
Elements

Over all width


in m

82+825

3 x 22.0

RCC T Beam

12.90

36

113+045

3 x 35.0

PSC Box Girder

12.90

8.

Traffic control devices and road safety works

8.1

Traffic control devices and road safety works shall be provided in accordance with
Section 9 of the Manual.

8.2

Specifications of the reflecting sheeting: As per the Clause 9.3 of the Manual of
Specification and Standards.

9.

Roadside furniture
Roadside furniture shall be provided in accordance with the provisions of section 11 of
the Manual.

9.1

Traffic Signs and Pavement Markings


Traffic signs and pavement markings shall include road side signs, overhead signs,
curve mounted signs and road marking along the project highway. The locations for
these provisions shall be finalised as per manual.
(i) Minimum Concrete Crash Barrier length of 2217m, minimum Metal beam crash barrier
length of 6860m and Separators (MS railings) wherever are required as per manual.
(iii) Traffic Safety Devices wherever required
(iv) Boundary Stones
(v) Hectometer / Kilometer Stones
(vi) Traffic Blinker Signal (L.E.D) shall be provided at all At-grade junctions, median
opening, schools, hospitals, police station, places of worship and institutional
buildings etc.
(vii) Overhead traffic signs: location and size
a)

2 Nos. Cantilever Type with size 4.0m x 1.2m.

b)

2 Nos. overhead signs with size 12m x 1.2m.

Locations will be decided by Authoritys Engineer/MoRTH as per site requirement.


(viii) Delineators and Studs: Studs (100mm x 100mm) with reflective panels of dual
prismatic cube capable of providing total reflection of light entering the lens face for
lane marking and delineators for night time visibility shall be provided for the entire
project Highway.
10.

Compulsory afforestation
Total of 112992 Nos. trees are identified to be affected in the proposed ROW. As per
guideline, 1: 2 new trees to be planted by the concessionaire
37

11.

Hazardous locations
The safety barriers shall also be provided at the following hazardous locations:
S. No.

Location stretch from (km) to (km)

LHS/RHS

This shall be Provided at High Embankment and at Sharp curve locations.


12.

Special requirements for hill roads

12.1

Refer to paragraph 14.5 and 14.8 of the Manual and provided details where relevant and
required.
Construction of Retaining wall/Toe Wall and Breast Wall:
The existing project road alignment generally follows a ridge line without much cut fill
locations. Thus the existing road alignment is characterised by abutting settlings and
commercial activities.
Based on the proposed vertical profile retaining structures have been proposed for valley
as well as hill sides, wherever called for as per site condition.
The list of locations of Retaining walls on valley side and Breast Walls on hill side are
presented in following locations:
i) Retaining Wall:
Design Chainage
From
To

Height of Retaining Wall


1m-3m 3m-5m 5m-10m >10m

Length in
m

Remarks

55.000

128.712

730

320

260

40

1350

Left Hand Side

55.000

128.712

580

200

70

30

880

Right Hand side

ii) Breast Wall:


Design Chainage
From
To

Height of Breast Wall


1m-2m 2m-5m
> 5m

Length in
m

Remarks

55.000

128.712

50

50

130

230

Left Hand Side

55.000

128.712

10

10

20

Right Hand side

Details are provided as per alignment plan & Profile.


12.2

Protection work by Stone Pitching: protection work has been proposed at high
embankment locations. Details are as follows:

38

Sl.
No
.
1
2
3
4

5
6
7

Description

Length
in m

Remarks

High Embankment (Slope On Both Sides) with


New Pavement at Realignment / Bypass
High Embankment (Toe Wall On One Side) with
Partial Reconstruction at Widening Sections
High Embankment (Toe Wall On One Side) with
New Pavement at Realignment / Bypass
High Embankment (Toe Wall And Retaining
Wall) with New Pavement at Realignment /
Bypass
High Embankment on One Side with Partial
Reconstruction at Widening Sections
High Embankment on One Side with New
Pavement at Realignment / Bypass
Toe Wall on One Side and Normal Embankment
Slope
on
Another
Side
with
Partial
Reconstruction at Widening Sections
Toe Wall on One Side
and Normal
Embankment Slope on Another Side with New
Pavement at Bypass / Realignment
Total Length in m

2x20

As
per
alignment of
Plan
&
Profile

2x100
2x420
2x90
1x230
1x1050
1x320

1x1200
4060

Details are provided as per alignment plan & Profile.


13.

Change of Scope
The length of structures and bridges specified hereinabove shall be treated as an
approximate assessment. The actual lengths as required on the basis of detailed
investigations shall be determined by the Contractor in accordance with the
Specifications and Standards. Any variations in the lengths specified in this Schedule B
shall not constitute a Change of Scope or any deviation thereof.

39

Amendment 5
In Schedule-C, Clause 2:- Description of Project Facilities, Bus-bays and Bus
Shelter is replaced as below:
Bus-bays and Bus Shelters:
4Nos. of Bus Shelters have been proposed on the project corridor as project facility.
Locations of bus-shelter will be decided by Authoritys Engineer/MoRTH as per site
requirement.

40

Amendment 6
In Schedule-H (See Clause 19.3) is replaced as below:
Schedule-H
(See Clause 19.3)
Contract Price Weightages
1.1

The Contract Price for this Agreement is Rs. . crore.

1.2

Proportions of the Contract Price for different stages of Construction of the Project
Highway shall be as specified below:
Weightage in
percentage to
Percentage
Item
Stage for Payment
the Contract
weightage
Price
1
2
3
4
Road works
[83.71%]
A- Widening and strengthening of
existing road
including
approaches to minor
(1) Earthwork up to top of the sub2.98%
bridges, Major
grade
Bridges and
(2) Granular work (sub-base, base,
16.50%
Structures
shoulders)
(3) Bituminous work
7.84%
(excluding service
roads)
(4) Widening and repair of culverts
0.13%
(5) Widening and repair of Minor
bridges
B- New 2-lane realignment/ bypass

0.09%

(1) Earthwork up to top of the subgrade


(2) Granular work (sub-base, base,
shoulders)
(3) Bituminous work

5.37%

(4) CC Pavement

Nil

29.25%
13.90%

C- New culverts, minor bridges,


underpasses, overpasses on existing
road, realignments, bypasses:
(5) Culverts

5.32%

(6) Minor bridges

2.33%

(7) Cattle/ Pedestrian underpasses

Nil

41

Item
1

Major Bridge works

Weightage in
percentage to
the Contract
Price
2

[3.37%]

Percentage
weightage

Stage for Payment


3
(8) Pedestrian overpasses

4
Nil

(9) Grade separated structures

Nil

(a) Underpasses

Nil

(b) Overpass

Nil

A-Widening and repairs of major


bridges
(1)Foundation

0.03%

(2)Sub-structure

0.04%

(3)Super-structure (including crash


barriers etc. complete)
B-Widening and repair of

0.12%

(a) ROB Nil


(b) RUB Nil
C-New major bridges
(1) Foundation

2.18%

(2) Sub-structure

0.42%

(3) Super-structure (including crash


barriers etc. complete)
D-New rail-road bridges

0.58%

(a) ROB Nil


(b) RUB Nil
Structures (elevated
sections, reinforced
earth)

Other engineering
works

[Nil]

[12.92%]

(1) Foundation

Nil

(2) Sub-structure

Nil

(3) Super-structure (including crash


barriers etc. complete)
(4) Reinforced Earth

Nil

(5) Fly Ash

Nil

(i)Service roads

Nil

(ii)Toll Plaza

Nil

(iii)Road side drains

1.88%

42

Nil

Item
1

Weightage in
percentage to
the Contract
Price
2

Stage for Payment

Percentage
weightage

3
(iv)Road signs, markings, km stones,
safety devices,
(v)Project facilities (Bus Shelter)

4
2.13%

(vi)Repairs to bridges/ structures

Nil

a) Providing wearing cost

0.19%

b) Replacement of bearings, joints

Nil

c) Providing crash barriers

0.40%

d) Other items (Junctions)

1.96%

(vii)Road side plantation

0.37%

(viii) Protection works

0.90%

(ix)Traffic Diversion, Safety and traffic


management during construction
(x) Breast wall and RCC Retaining
Wall

Nil

0.01%

5.08%

1.3

Procedure of estimating the value of work done.

1.3.1

Road works including approaches to minor bridges, Major Bridges and Structures
(excluding service roads).
Procedure for estimating the value of road work done shall be as follows:

Stage of Payment

Table 1.3.1
Percentage
- weightage

Payment Procedure

A-Widening and strengthening


(1) Earthwork up to top of the
sub-grade
(2) Granular work (sub-base,
base, shoulders)

2.98%
16.5%

(3) Bituminous work

7.84%

(4) Widening and repair of


culverts

0.13%
43

Unit of measurement is linear


length. Payment of each stage
shall be made on pro rata
basis on completion of a stage
in a length of not less than 10
(ten) percent of the total
length. @
Cost of ten completed culverts
shall be determined pro rate

Stage of Payment

(5) Widening and repair of


minor bridges

Percentage
- weightage

0.09%

Payment Procedure
with respect to the total
number of culverts. Payment
shall be made on the
completion of ten culverts.
Cost of each minor bridge shall
be determined on pro rata
basis with respect to the total
linear length of the minor
bridges. Payment shall be
made on the completion of a
minor bridge.

B- New 2-lane realignment,


bypass
(1) Earthwork up to top of the
sub-grade
(2) Granular work (sub-base,
base, shoulders)
(3) Bituminous work
(4) CC Pavement
C-New culverts, minor bridges,
underpasses, overpasses on
existing road, realignments,
bypasses:

5.37%
29.25%
13.90%
Nil

(1) Culverts

5.32%

(2) Minor bridges

2.33%

(3) Cattle/Pedestrian
underpasses

Nil

44

Unit of measurement is linear


length. Payment of each stage
shall be made on pro rata
basis on completion of a stage
in full length or 5 (five) km
length.

Cost of each culvert shall be


determined on pro rata basis
with respect to the total
number of culverts. Payment
shall be made on the
completion of five culverts.
Cost of each minor bridge shall
be determined on pro rata
basis with respect to the total
linear length of the minor
bridges. Payment shall be
made on the completion of a
minor bridge.
Cost of each cattle/pedestrian
underpass shall be determined
on pro rata basis with respect
to the total number of
cattle/pedestrian underpasses.
Payment shall be made on the

Stage of Payment

Percentage
- weightage

Payment Procedure
completion of the number of
cattle/pedestrian underpasses
specified below:

(4) Pedestrian Overpasses


(5) Grade separated
structures

Nil

Total no.
Stage for
Payment
1 to 5
on completion of all 6 or more
on completion of five
Same as for (3) above

(a) Underpasses (Vehicular)

Nil

Same as for (3) above

Nil

Same as for (3) above

(b) Overpasses

@
For example, if the total length of bituminous work to be done is 100 km, the cost per km
of bituminous work shall be determined as follows:
Cost per km = P x weightage for road work x weightage for bituminous work
x (1/L)
Where P = Contract Price
L = Total length in km
Similarly, the rates per km for stages (1), (2) and (4) above shall be worked out.
1.3.2

Major Bridge works

Procedure for estimating the value of Major Bridge works shall be as stated in table 1.3.2:
Table 1.3.2
Stage of Payment
A- Widening and repairs of
Major Bridges
Foundation: On completion of
the foundation work including
foundations for wing and return
walls

% Weightage

0.03%

45

Payment Procedure
Cost of each Major Bridge
(widening and repairs) shall be
determined on pro rata basis with
respect to the total linear length
(m) of the Major Bridges
(widening and repairs). Payment

Stage of Payment
Sub-structure: On completion of
abutments, piers up to the
abutment/pier cap
Super-structure: On completion
of the super structure in all
respects including hand
rails/crash barriers, wing walls,
return walls, guide bunds, if any,
tests on completion etc., bridge
complete in all respects and fit
for use.
B- Widening and repairs of

% Weightage
0.04%

0.12%

(a) ROB

Nil

(b) RUB

Nil

E- New Major Bridges


(1) Foundation: On completion
of the foundation work
including foundations for
wing and return walls.
(2) Sub-structure: On completion
of abutments, piers up to the
abutment/pier cap
(3) Super-structure: On
completion of the super
structure in all respects
including hand rails/crash
barriers, wing walls, return
walls, guide bunds, if any,
tests on completion etc.,
complete in all respects and
fit for use
C- New Rail-road bridges
(a) ROB
(b) RUB

2.18%

0.42%

0.58%

Nil
Nil

46

Payment Procedure
shall be made on completion of
each stage of a Major Bridge as
per the weightage given in this
table.

Cost of each ROB/RUB


(widening and repairs) shall be
determined on pro rata basis with
respect to the total linear length
(m) of the ROB/RUB (widening
and repairs). Payment shall be
made on completion of a
ROB/RUB.
Cost of each major bridge shall
be determined on pro rata basis
with respect to the total linear
length (m) of the major bridges.
Payment shall be made on
completion of each stage of a
major bridge as per the
weightage given in this table.

Cost of each ROB/RUB shall be


determined on pro rata basis with
respect to the total linear length
(m) of the ROB/RUB. Payment
shall be made on completion of a

Stage of Payment

1.3.3

% Weightage

Payment Procedure
ROB/RUB.

Structures
Procedure for estimating the value of structure work shall be as stated in table 1.3.3:

Stage of payment
(1) Foundation: On completion of
the foundation works including
foundations for wing and
return walls
(2) Sub-structure: On completion
of abutments, piers up to the
abutment/pier cap
(3) Super-structure: On
completion of the Structure
along with super structure,
including hand rails/crash
barriers, wing walls, return
walls, tests on completion
etc., elevated structure
complete in all respects and fit
for use.
(4) Reinforced Earth work

(5) Fly Ash

1.3.4

Table 1.3.3
% Weightage

Payment procedure

Nil

Nil

Nil

Nil

Nil

Cost of each structure shall be


determined on pro rata basis in
respect to the total linear length
(m) of all the structures.
Payment shall be made on
completion of each stage of a
structure as per the weightage
given in this table.

Payment shall be made on pro


rata basis on completion of 25
(twenty five) percent of total
area.
Payment shall be made on pro
rata basis on completion of 25
(twenty five) percent of total
area.

Other engineering works.

Procedure for estimating the value of other engineering works done shall be as stated in
table 1.3.4:
Table 1.3.4
Stage of Payment
% Weightage Payment Procedure
(i) Service roads
Nil
Unit of measurement is linear
length in km. Cost per km shall
be determined on pro rata basis
with respect to the total length of
47

Stage of Payment

(ii) Toll plaza

% Weightage

Nil

(iii) Road side drains

1.88%

(ii)

2.13%

Road signs, markings,


km stones, safety
devices,. .
(iii)
Project Facilities
a) Bus bays

0.01%

b) Truck lay-bys

Payment Procedure
the service roads. Payment shall
be made for completed service
road in a length of not less than
20 (twenty) percent of the total
length of service roads.
Unit of measurement is each
completed toll plaza. Payment of
each toll plaza shall be made on
pro rata basis with respect to the
total of all toll plazas.
Unit of measurement is linear
length in km. Payment shall be
made on pro rata basis on
completion of a stage in a length
of not less than 10% (ten per
cent) of the total length.

Payment shall be made on pro


rata basis for completed facilities.

c) Rest areas
d) Others
(iv)
Repairs to existing
bridges/structures
a) Providing wearing coat

0.19%

b) Replacement of bearing,
joints
c) Providing crash barriers
d) Other items
(i) Roadside plantation

0.003%

(ii) Protection works

0.90%

(iii) Traffic Diversion, Safety and


traffic management during
construction
(iv) Breast Wall & Retaining

0.40%
1.96%
0.37%

Nil

5.08%
48

Payment shall be made for


completed items.
Unit of measurement is linear
length. Payment shall be made
on pro rata basis on completion
of a stage in a length of not less
than 10% (ten per cent) of the
total length.
Payment shall be made on
prorate basis every six month.
Payment shall be made on

Stage of Payment
wall

% Weightage

Payment Procedure
same as breast wall / Retaining
wall basis

2.

Procedure for payment for Maintenance

2.1

The cost for maintenance shall be as stated in Clause 14.1.1.

2.2

Payment for Maintenance shall be made in quarterly installments in accordance with the
provisions of Clause 19.7.

49

Amendment 7
In Schedule-J (See Clause 10.3.2) is replaced as below:
SCHEDULE J
(See Clause 10.3.2)
PROJECT COMPLETION SCHEDULE
1

Project Completion Schedule


During Construction period, the Contractor shall comply with the requirements set
forth in this Schedule-J for each of the Project Milestones and the Scheduled
Completion Date. Within 15 (fifteen) days of the date of each Project Milestone, the
Contractor shall notify the Authority of such compliance along with necessary
particulars thereof.

Project Milestone-I

2.1

Project Milestone-I shall occur on the date falling on the 180th (one hundred and
eightieth) day from the Appointed Date (the Project Milestone-I).

2.2

Prior to the occurrence of Project Milestone-I, the Contractor shall have commenced
construction of the Project Highway and submitted to the Authority duly and validly
prepared Stage Payment Statements for an amount not less than 10% (ten per cent)
of the Contract Price.

Project Milestone-II

3.1

Project Milestone-II shall occur on the date falling on the 650th (Six hundred and fifty)
day from the Appointed Date (the Project Milestone-II)

3.2

Prior to the occurrence of Project Milestone-II, the Contractor shall have continued
with construction of the Project Highway and submitted to the Authority duly and
validly prepared Stage Payment Statements for an amount not less than 35% (thirty
five per cent) of the Contract Price.

Project Milestone-III

4.1

Project Milestone-III shall occur on the date falling on the 910th (Nine hundred and
ten) day from the Appointed Date (the Project Milestone-III).

4.2

Prior to the occurrence of Project Milestone-III, the Contractor shall have continued
with construction of the Project Highway and submitted to the Authority duly and
validly prepared Stage Payment Statements for an amount not less than 55% (fifty
five per cent) of the Contract Price.

50

Scheduled Completion Date

5.1

The Scheduled Completion Date shall occur on the 912th (Nine hundred Twelfth) day
from the Appointed Date.

5.2

On or before the Scheduled Completion Date, the Contractor shall have completed
construction in accordance with this Agreement.

Extension of time
Upon extension of any or all of the aforesaid Project Milestones or the Scheduled
Completion Date, as the case may be, under and in accordance with the provisions
of this Agreement, the Project Completion Schedule shall be deemed to have been
amended accordingly.