Sunteți pe pagina 1din 5

ALAINSTADIUM&MIXEDUSEDEVELOPMENTPHASE1.

Ref.No.

TITLE

: ITPMEP09

Rev.No. : 00
INSPECTION&TESTPLANFOR
INSTALLATION&TERMINATIONOFCABLES&
Date
: 18.09.2012
WIRES

ALAINSTADIUM&MIXEDUSEDEVELOPMENTPHASE1.1

INSPECTION&TESTPLANFOR
INSTALLATION&TERMINATIONOFCABLES&WIRES

ITPMEP09

MAINCONTRACTOR:
BAMINTERNATIONAL

SUBCONTRACTOR:
ETA

ALAINSTADIUM&MIXEDUSEDEVELOPMENTPHASE1.1

Ref.No.

TITLE

: ITPMEP09

Rev.No. : 00
INSPECTION&TESTPLANFOR
INSTALLATION&TERMINATIONOFCABLES&
Date
: 18.09.2012
WIRES

REVISIONRECORD

Thiscoverpageisarecordofallrevisionsofthedocumentidentifiedabovebynumberandtitle.Allpreviouscover
pagesareherebysupersededandaretobedestroyed.

Thecontractorhasthefullrighttomodify,amendorchangeMethodStatementandsupportingdocumentsasrequired
orasdeemednecessary.Allsuchdocumentswillbesubmittedtothe"Consultant's"forapproval.

Rev.
No.

Date

Prepd'By

00

18.09.12

MOHIDEEN

Chkd'By
BAMApproval DescriptionandPageNumbersofRevisions

ANA

MAINCONTRACTOR:
BAMINTERNATIONAL

SUBCONTRACTOR:
ETA

INSPECTION & TEST PLAN

AL AIN STADIUM & MIXED USE DEVELOPMENT PHASE 1.1

REF. No. : ITP-MEP-09


REV. No.: 00
DATE
: 18.09.2012

INSPECTION & TEST PLAN FOR


INSTALLATION & TERMINATION OF CABLES & WIRES
AREA

LEVEL

ITEM NO.
1

DESCRIPTION

Material Approvals

Material submittals

Quality Documents

Method Statement ref. MS-MEP-09

Materials Verification

BAM

CON

Approved material submittals

Inspection of Materials Received at site

Project Specification

Storage

Manufacturer's Recommendations &


Method Statement no.MS-MEP-09

ETA

Document Approvals

Quality Control Procedure ref. QCP-MEP-09


2

INSPECTION & ACCEPTANCE

SPECIFICATION / CRITERIA

Installation
Safety Clearance

Project Safety Plan

Installation

Project Specification
Method Statement ref. MS-MEP-09
Approved shop drawings

VERIFYING
DOCUMENT

Project Specification
Inspection of Installation & Termination of
Cables & Wires

of the area
MEP-09

Approved shop drawings


Mehtod statement MS-

FM-MEP-09A

INSPECTION & TEST PLAN

AL AIN STADIUM & MIXED USE DEVELOPMENT PHASE 1.1

REF. No. : ITP-MEP-09


REV. No.: 00
DATE
: 18.09.2012

INSPECTION & TEST PLAN FOR


INSTALLATION & TERMINATION OF CABLES & WIRES
AREA

LEVEL

ITEM NO.
4

DESCRIPTION

ETA

Cleaning Protection
Cleaning on completion of the activity

Method statement No. MS-MEP-09

Protection (if required) against possible

Method statement No. MS-MEP-09

damages till Commissioning/Handing-over


5

VERIFYING
DOCUMENT

INSPECTION & ACCEPTANCE

SPECIFICATION / CRITERIA

BAM

CON

Document Review

LEGEN :

Site Inspection Reports

Signed & Approved

Test Certificates (if applicable)


Pressure Test Report (if applicable)
NCRs (if any)

Handed-over
Signed & Approved
All NCRs Closed & Signed off

H
H
H

R
R
R

R
R
R

H - HOLD FOR INSPECTION

W - WITNESS INSPECTION

SUBCONTRACTOR :

ETA APPROVAL

BAM APPROVAL

CONSULTANT APPROVAL

NAME :

NAME

NAME :

SIGN

SIGN

SIGN

DATE

DATE

DATE

ETA

S - SURVEILLANCE INSPECTION

- REVIEW