STORAGE CAPACITY ANALYSIS FOR PETRON PETCOKE PROJECT

Basis :
Product:
Density, low
Density, High

Revit 3-D (actual layout)


Petcoke
0.72 Metric Ton per cubic meter
1.04 Metric Ton per cubic meter
CASE No. 1

CASE No. 2

Outside Diameter

meter

50.00

Inside Diameter

meter

Concrete Wall
Pile Height
Pile Width

CASE No. 3 (2 x 25,000MT Capacity)

Outside Diameter

meter

60.00

7.50

Inside Diameter

meter

meter

8.00

Concrete Wall

meter

14.600

Pile Height

21.250

Pile Width

meter

Outside Diameter

meter

75.00

7.50

Inside Diameter

meter

7.50

meter

8.00

Concrete Wall

meter

7.00

meter

16.360

Pile Height

meter

17.676

26.250

Pile Width

meter

meter

33.750

Volume

cu. meter

18,719.00

Volume

cu. meter

29,338.00

Volume

cu. meter

38,070.00

Storage Cap. (Min)

Metric Ton

13,477.68

Storage Cap. (Min)@ 40deg

Metric Ton

21,123.36

Storage Cap. (Min)@ 40deg

Metric Ton

27,410.40

Storage Cap. (Max)

Metric Ton

19,467.76

Storage Cap. (Max) @ 35 deg

Metric Ton

30,511.52

Storage Cap. (Max) @ 35 deg

Metric Ton

39,592.80

CASE No. 4 (1 x 50,000MT Capacity)

CASE No. 5 (1 x 50,000MT Capacity) w divider

Outside Diameter

meter

90.00

Inside Diameter

meter

Concrete Wall
Pile Height
Pile Width

Outside Diameter

meter

100.00

7.50

Inside Diameter

meter

7.50

meter

8.00

Concrete Wall

meter

7.00

meter

20.802

Pile Height

meter

22.050

41.250

Pile Width

meter

meter

46.250

Volume

cu. meter

59,654.00

Volume

cu. meter

73,840.00

Storage Cap. (Min)

Metric Ton

42,950.88

Storage Cap. (Min)

Metric Ton

53,164.80

Storage Cap. (Max)

Metric Ton

62,040.16

Storage Cap. (Max)

Metric Ton

76,793.60

Prepared By:

Approved By:

Albert R. Rivera

Craig Stall