CROSS DRAINAGE WORKS


MORT &
Hs
Item
Description of Works
Specific
ation
CROSS DRAINAGE WORKS
6. Box Culvert (Size 1/22/1.5 26m, 1/22/1.5 28m, 1/22/1.5 46m,
1/33/0 26m, 1/33/0 44m, 3/33/3 26m 1/53/0 26m, 1/54/0 26m
1/63/0 26m, 1/64/0 26m )
6.1

Unit

Quantity

Rate
(in Rs.)

Amount
(in Rs.)

49853.98

54.00

1591.830

6514.00

10369178.00

13482.453

8917.00

120223030.00

12.1/304 Excavation for Structures (Earth work in


excavation of foundation of structures as per
drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with approved material.
(I) In ordinary Soil
(B) Mechanical means
(b) with dewatering
(i) Depth up to 3m

6.2

Rate as per SOR 2013-14


Cum
Qnty. from Statement No.- 5
12.8 / Plain/Reinforced cement concrete,
in open
1500, foundation complete as per drawing and
1700 & technical specification including steel shuttering
2100 formwork

2692115.00

(P) With plasticiser ( Masterplast PL-1/SPL-2 or


equivalent ), air entraining and water reducing
plasticiser ( Masterplast PAE or equivalent) and
accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.

6.3

(A) P.C.C. Grade M-15


Rate as per SOR 2013-14
Cum
Qnty. from Statement No.- 5
13.5 / Plain/Reinforced cement concrete,
in sub
1500, structure complete as per drawing and technical
1700 & specification and steel shuttering formwork
2200
(P) With plasticiser (Masterplast PL-1/SPL-2 or
equivalent ), air entraining and water reducing
plasticiser ( Masterplast PAE or equivalent) and
accelerating plasticiser( Masterplast ACPL or
equivalent) conforming to IS-9103-1999
(F) RCC GRADE M25
Case II With Batching Plant, Transit Mixer and
Concrete Pump
Rate as per SOR 2013-14
Qnty. from Statement No.-5

Cum

MORT &
Hs
Item
Specific
ation
6.4

Description of Works

Quantity

Rate
(in Rs.)

Amount
(in Rs.)

904.611

73343.00

66346880.00

24089.586

1948.00

46926513.00

Rm

1663.040

2044.00

3399254.00

Metre

1736.000

1861.00

3230696.00

938.700

5498.00

5160973.00

Unit

13.6/160 Supplying, fitting and placing TMT bar


0 & 2200 reinforcement in sub-structure complete as per
drawing and technical specifications
(a) From Primary Sources:
TATA/SAIL/Esser Steel/ Jindal steel/Shyam
steel
(i) TMT Corrosion Resistant Steel (CRS) reinforcement bar
of Fe-500 N/mm2

6.5

6.6

6.7

6.8

Tonn
Rate as per SOR 2013-14
e
Qnty. from Statement No.-5
13.9/710. Back filling behind End wall of abutment,wing
1.4
wall & return wall complete as per Drawing and
Technical
(B) SandySpecification
materials
Rate as per SOR 2013-14
Cum
Qnty. from Statement No.-5,
14.7/ Construction of RCC railing of M30 Grade in-situ
1500, with 20mm nominal size aggregate, true to line
1600, and grade, tolurence of vertical RCC post not to
1700 & exceed 1 in 500, centre to centre spacing
2703 between vertical post not to exceed 2000mm,
leaving adequat space between vertical posts
for expansion, complete as per approved
drawings and technical specifications.
Rate as per SOR 2013-14
Qnty. from Statement No.-5

14.19/
2600

14.10/
2700

Asphaltic plug joint-(Providing and laying of


asphaltic plug joint to provide for horizontal
movement of 25mm and vertical movement of
2mm, depth of joint varying from 75mm to
100mm, width varying from 500mm to 750mm
(in traffic direction),covered with a closure plate
200mm x 6mm of wiedable structural steel
conforming IS:2062 ,asphaltic plug consist of
polymer modified bitumen binder, carefully
selected single size agg. of 12.5mm nominal
size and heat resistant foam caulking/backer
rod, all as per approved drawing and
specifcations).

PCC M15 Grade levelling course below


approach slab complete as per drawing and
technical specification.
Rate as per SOR 2013-14
Cum
Qnty. from Statement No.- 7,

10

MORT &
Hs
Item
Specific
ation
6.9

6.10

14.11/
1500,
1600,
1700 &
2704

Unit

Quantity

Rate
(in Rs.)

Amount
(in Rs.)

Cum

1822.800

12025.00

21919170.00

sqm

787.467

688.00

541777.00

Cum

15093.125

54.00

815029.00

(A) P.C.C. Grade M-15

Cum

1148.992

6514.00

7484532.00

(B) P.C.C. Grade M-20

Cum

5961.180

7482.00

44601549.00

Description of Works
Reinforcement cement concrete approach slab
including reinforcement and formwork complete
as per drawing and technical specification.
(a) With
TATA make TMT CRS (Fe-500) grade rebar
Rate as per SOR 2013-14
Qnty. from Statement No.- 7

14.5/ B Mastic Asphalt :Providing and laying


Bituminous wearing course comprising of tack
coat with bitumen emulsion CSS-1h as per
APWD SOR item no 5.2 & MOSRT&H
Specification Nos 503 0.6mm thick mastic
asphalt as per APWD SOR item no 14.5 &
MOSRT&H Specification Nos 515 & 2702 and 2
layers of 25 mm thick Asphalt concrete including
of close Graded Premix Surfacing(CGPS)
materials with Type -a aggregate as per APWD
SOR tem no 5.11 & MOSRT&H Specification
Nos 512 including all lead and lift as directed

Wing Wall
6.11 12.1/ 304 Excavation for Structures (Earth work in
excavation of foundation of structures as per
drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with approved material.
(I) In ordinary Soil
(B) Mechanical means
(b) with dewatering
(i) Depth up to 3m
Rate as per SOR (2009-010)
Qnty. from Statement No.-5,
6.12

12.8 /
1500,
1700 &
2100

Plain/Reinforced cement concrete,


in open
foundation complete as per drawing and
technical specification including steel shuttering
formwork
(P) With plasticiser ( Masterplast PL-1/SPL-2 or
equivalent ), air entraining and water reducing
plasticiser ( Masterplast PAE or equivalent) and
accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.

11

MORT &
Hs
Item
Specific
ation

6.13

Description of Works

Unit

Quantity

Rate
(in Rs.)

Each

3584.000

204.00

Amount
(in Rs.)

Rate as per SOR 2013-14


Qnty. from Statement No.- 5
13.8/ Providing weep holes in brick masonry
2200 & works/PCC/RCC abutment,wing wall/returnwall
2706 with 100 mm dia AC pipe extending through the
full width of the Structure with slope of 1v:20
each towards drawing face Complete as per
Drawing and Technical Specification.

Rate as per SOR 2013-14


Qnty. from Statement No.-5

731136.00

12

MORT &
Hs
Item
Specific
ation

Description of Works

Unit

Quantity

Rate
(in Rs.)

4163.250

54.00

3027.900

7046.00

11496.669

54.00

2092.400

6514.00

Amount
(in Rs.)

Curtain Wall
6.14 12.1/ 304 Excavation for Structures (Earth work in
excavation of foundation of structures as per
drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with approved material.

6.15

15.10/
2507.2

(I) In ordinary Soil


(B) Mechanical means
(b) with dewatering
(i) Depth up to 3m
Rate as per SOR 2013-14
Cum
Qnty. from Statement No.-5,
Curtain wall complete as per Drawing and
Technical Specification.

B) Cement concrete Grade M-15


Rate as per SOR 2013-14
Cum
Qnty. from Statement No.-5
APRON
6.16 12.1/ 304 Excavation for Structures (Earth work in
excavation of foundation of structures as per
drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with approved material.

6.17

(I) In ordinary Soil


(B) Mechanical means
(b) with dewatering
(i) Depth up to 3m
Rate as per SOR 2013-14
Cum
Qnty. from Statement No.- 5
12.8 / Plain/Reinforced cement concrete,
in open
1500, foundation complete as per drawing and
1700 & technical specification including steel shuttering
2100 formwork

224816.00

21334583.00

620820.00

(P) With plasticiser ( Masterplast PL-1/SPL-2 or


equivalent ), air entraining and water reducing
plasticiser ( Masterplast PAE or equivalent) and
accelerating plasticiser ( Masterplast ACPL or
equivalent) conforming to IS-9103-1999.
(A) P.C.C. Grade M-15
Rate as per SOR 2013-14
Qnty. from Statement No.-5

Cum

13629894.00

13

MORT &
Hs
Item
Specific
ation
6.18

6.19

Description of Works

Quantity

Rate
(in Rs.)

669.500

5273.00

Amount
(in Rs.)

15.8/250 Providing and laying Flooring complete as per


5
drawing and Technical specifications laid over
cement concrete bedding.
(A) Rubble stone laid in cement mortar 1:3
Rate as per SOR 2013-14
Cum
Qnty. from Statement No.-5
15.11/ Flexible Apron: Construction of flexible apron 1
2507.2 m thick Comprising of loose stone boulders
weighing not less than 40 kg beyond curtain
wall.
Rate as per SOR 2013-14
Qnty. from Statement No.-5

Unit

Cum 5430.900 1485.00


TOTAL COST OF CULVERT WORKS (Rs.)

RCC Drain cum footpath 1.50m wide


Rate as per Analysis -3
Qty as per statement No. 10

11544.000

3530274.00

8064887.00

381847106.00

#REF!

TOTAL COST OF CULVERT & DRAIN WORKS (Rs.)

#REF!

#REF!

Executive Engineer, PWD


NH Division, Nagaon

14

Analysis No. - 1

Rate Analysis for Earthwork in core per Cum

Chainage
Borrow Area
Total Lead
in km

Borrow Area at a average distance of 12 km

Extra lead
Base cost as
beyond 3KM
Total
Average Rate
per 3.16(a)
@ Rs. 7.74per (Col.4+Col.5)
(RS.)
SOR 2013-14
Cum

2
209
2
3
4
5
6
7

3
17
16
15
14
13
12
11

4
201.00
201.00
201.00
201.00
201.00
201.00
201.00

5
108.36
100.62
92.88
85.14
77.40
69.66
61.92

6
309.36
301.62
293.88
286.14
278.40
270.66
262.92

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

10
9
8
7
6
7
8
9
10
11
12
13
14
15
16
17
18

201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00

54.18
46.44
38.70
30.96
23.22
30.96
38.70
46.44
54.18
61.92
69.66
77.40
85.14
92.88
100.62
108.36
116.10

255.18
247.44
239.70
231.96
224.22
231.96
239.70
247.44
255.18
262.92
270.66
278.40
286.14
293.88
301.62
309.36
317.10

270.66

Analysis No. - 1.1


Rate Analysis for Earthwork in Shoulder & Subgrade per Cum
Base cost as
per 3.18(a)
SOR 2013-14

Extra lead
beyond 3KM
Total
Average Rate
@ Rs. 8.46 (Col.4+Col.5)
(RS.)
per Cum

Borrow Area at a average distance of 12 km

Chainage
Borrow Area
Total Lead
in km

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

17
16
15
14
13
12
11
10
9
8
7
6
7
8
9
10
11
12
13
14
15
16
17
18

235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00

93.06
84.60
76.14
67.68
59.22
50.76
42.30
33.84
25.38
16.92
8.46
0.00
8.46
16.92
25.38
33.84
42.30
50.76
59.22
67.68
76.14
84.60
93.06
126.90

328.06
319.60
311.14
302.68
294.22
285.76
277.30
268.84
260.38
251.92
243.46
235.00
243.46
251.92
260.38
268.84
277.30
285.76
294.22
302.68
311.14
319.60
328.06
361.90

286.82

Executive Engineer, PWD


Nagaon NH Division, Nagaon

Analysis No. -3
Analysis of Median with Kerb (Considering length 10.00m)

Sl. Item
Description of Work
Unit
No. No.
1 3.13/3 Excavation for Structures (Earth cum
04 work in excavation of foundation of
structures as per drawing and
technical specification, including
setting out, construction of shoring
and bracing, removal of stumps
and other deleterious matter,
dressing of sides and bottom,
backfilling the excavated earth to
the extent required and utilising
theremaining earth locally for road
work.)
(I) Ordinary soil.
A) Manual Means (Depth upto 3m)
(With dewatering).
Rate as per SOR 2009-10

13.5
(A)/
1500,
1700
&
2200

No.
2

Length Breadth Height Quanti


(m)
(m)
(m)
ty
10.00
0.25
0.50
2.50

Rate in
Rs.
116.00

Amount
in Rs.
290.00

Plain/Reinforced cement concrete, cum


in sub structure complete as per
drawing
and
technical cum
specification.
A) PCC Grade M-15
(p) Height up to 5m.
Rate as per SOR 2009-10

10

0.4

0.15

1.20

10

0.225

0.15

0.68

Total

1.88

4750.00

8906.00

4.14/4 Construction of Median and Island cum


07 with Soil Taken from Borrow Areas
(Construction of median and
Island above road level with
approved material brought from
borrow pits, sproad, slopped and
compacted as per clause 407).
Rate as per SOR 2009-10

10

4.00

0.65

26.00

116.00

3016.00

13.3/1 Plastering with cement mortar sqm


300 & (1:3) on sub-structure as per
2200 Technical specifications.
Rate as per SOR 2009-10

10

0.41

8.20

95.00

779.00

8.8/80 Painting Two Coats New Concrete sqm


3
Surfaces
Painting two coats after filling the
surface with synthetic enamel
paint in all shades on new
plastered concrete surfaces.
Rate as per SOR 2009-10

10

0.41

8.20

43.00

353.00

149

Sl. Item
Description of Work
Unit
No. No.
6 17.57 Pre fabricated railing :Rm
Providing, fitting and erecting pre
febricated
railing
of
TATA
STRUCTURE materials having
size of 2.00 x 0.90 M in panels
made of 25x25x2.6/40x40x2.6
vertical
bars
and
40x40x2.6/32x32x2.6
horizontal
bars. The two end posts of each
panel are founded with M-15
cement concrete up to a depth of
200mm with anti corrosive primer
and paint etc. complete as per
drawing and approved technical
specification as directed.
Rate as per SOR 2009-10

No.
2

Length Breadth Height Quanti


(m)
(m)
(m)
ty
10
20

Rate in
Rs.
1099.00

Amount
in Rs.
21980.00

11.8/3 Planting flowering plants


07(a) shurbs in central verge.
Rate as per SOR 2009-10

and

km

0.01

0.01

28474.00

285.00

11.8/3 Maintenance of flowering plants


07(b) and shurbs in central verge for one
year.
Rate as per SOR 2009-10

km

0.01

0.01

114798.00

1148.00

Asstt.Executive Engineer, PWD

Total =
36757.00
Cost per Rm = 3676.00

Executive Engineer, PWD


Nagaon NH Division, Nagaon

Nagaon NH Sub-Division, Nagaon

150

Statement No.- 5

Quantity Summery Sheet of RCC Box Culverts


1/22/1.5
St. 5A

Sl.
No.

MORT & Hs
specification

Item

No.
of
Cul.

Qty.from Sta
No.5A

1
2
3

12.1/ (I)(B)(b)(i) E/W in excavation


12.8/(P)(A)

PCC Below Box Culvert

13.5/ (P) (F) C-II RCC

13.6/(A) (i)

13.9/(B)

1/22/1.5 28m
St. 5B
Total

No.
of
Cul.

Qty.from Sta
No.5B

41

463.35

18997.22

41

15.44

41

107.92

1/22/1.5 46m
St. 5C
Total

No.
of
Cul.

Qty.from Sta
No.5C

492.24

492.24

633.22

16.37

4424.88

114.51

1/3 3/0
St. 5D
Total

No.
of
Cul.

Qty.from Sta
No.5D

Total

12

13

14

752.32

2256.95

17

693.99

11797.81

16.37

24.74

74.23

17

20.91

355.52

114.51

173.82

521.47

17

170.12

2892.02

Reinforcement

41

7.09

290.61

7.52

7.52

11.39

34.17

17

11.03

187.43

Backfilling

41

237.39

9732.96

252.23

252.23

385.76

1157.27

17

335.63

5705.74

14.7

Railing

41

19.20

787.20

19.20

19.20

19.20

57.60

17

21.68

368.56

14.10

PCC M15 below App. Slab

41

0.00

0.00

0.00

0.00

0.00

0.00

17

27.30

464.10

14.19

Asphalt plug joint

41

0.00

0.00

0.00

0.00

0.00

0.00

17

52.00

884.00

14.11

RCC Approach slab

41

0.00

0.00

0.00

0.00

0.00

0.00

17

54.60

928.20

10

14.5/B

Wearing Coat Masting Ashphalt

41

0.00

0.00

0.00

0.00

0.00

0.00

17

21.14

359.35

41

69.85

2863.69

69.85

69.85

69.85

209.54

17

69.85

1187.38

Wing Wall
1

12.1/ (I)(A)(I)(I) E/W in excavation

12.8B/ (A)

PCC M15

41

6.35

260.34

6.35

6.35

6.35

19.05

17

6.35

107.94

12.8B/ (B)

PCC M20

41

44.03

1805.23

44.03

44.03

44.03

132.09

17

99.80

1696.60

13.8

Weep Holes

41

32.00

1312.00

32.00

32.00

32.00

96.00

17

48.00

816.00

41

53.375

2188.38

53.375

53.38

53.375

160.13

17

53.38

907.38

41

27.10

1111.10

27.10

27.10

27.10

81.30

17

44.40

754.80

41

139.94

5737.55

139.94

139.94

139.94

419.82

17

148.49

2524.32

Curtain Wall
1
2

12.1/ (I)(A)(I)(I) E/W in excavation


15.10/(B)

PCC M15
Apron

12.1/ (I)(A)(I)(I) E/W in excavation

12.8B/(A)

PCC M15

41

11.4

467.40

11.4

11.40

11.4

34.20

17

34.20

581.40

15.9

Stone Embaded in C.C.

41

3.4

139.40

3.4

3.40

3.4

10.20

17

11.40

193.80

15.11

Flexible Apron

41

47.2

1935.20

47.2

47.20

47.2

141.60

17

85.60

1455.20

82

Executive Engineer, PWD


Nagaon NH Division, Nagaon

83

Statement No.- 5

Quantity Summery Sheet of RCC Box Culverts


1/3 3/0 44m
St. 5E

3/33/3
St. 5F
Total

No.
Qty.from
of
Sta No.5F
Cul.

1/5 3/0
St. 5G
Total

No.
Qty.from
of
Sta No.5G
Cul.

1/54/0
St. 5H
Total

No.
Qty.from
of
Sta No.5H
Cul.

1/6 3/0
St. 5I
Total

No.
Qty.from
of
Sta No.5I
Cul.

1/64/0
St. 5J
Total

Grand
Total

19

20

21

1165.01

4660.05

49853.98

153.15

30.87

123.49

1591.83

1894.38

423.64

1694.57

13482.45

Total

No.
of
Cul.

Qty.from Sta
No.5E

No.
Qty.from
of
Sta No.5J
Cul.

12

13

14

12

13

14

18

19

20

18

19

20

18

19

20

18

1173.38

2346.76

1460.54

1460.54

773.54

2320.63

1116.09

1116.09

881.14

4405.69

34.79

69.58

60.34

60.34

25.37

76.10

29.82

29.82

30.63

285.66

571.31

253.86

253.86

262.64

787.92

327.51

327.51

378.88

19.74

39.48

23.51

23.51

21.21

63.62

22.55

22.55

23.72

118.62

29.27

117.09

567.99

1135.98

475.35

475.35

347.69

1043.06

518.22

518.22

375.51

1877.55

547.80

2191.21

24089.59

904.61

21.68

43.36

21.40

21.40

26.28

78.84

26.48

26.48

28.88

144.40

29.00

116.00

1663.04

46.20

92.40

0.00

0.00

27.30

81.90

54.60

54.60

27.30

136.50

27.30

109.20

938.70

88.00

176.00

0.00

0.00

52.00

156.00

52.00

52.00

52.00

260.00

52.00

208.00

1736.00

92.40

184.80

0.00

0.00

54.60

163.80

54.60

54.60

54.60

273.00

54.60

218.40

1822.80

35.77

71.54

0.00

0.00

25.62

76.87

25.82

25.82

28.16

140.79

28.28

113.10

787.47

69.85

139.69

69.85

69.85

811.78

2435.34

811.78

811.78

811.78

4058.90

811.78

3247.12

15093.12

6.35

12.70

6.35

6.35

56.64

169.91

56.64

56.64

56.64

283.18

56.64

226.54

1148.99

99.80

199.60

99.18

99.18

108.79

326.37

196.32

196.32

121.04

605.20

214.14

856.56

5961.18

48.00

96.00

48.00

48.00

80.00

240.00

80.00

80.00

96.00

480.00

96.00

384.00

3584.00

53.38

106.75

53.38

53.38

53.38

160.13

53.38

53.38

53.38

266.88

53.38

213.50

4163.25

44.40

88.80

73.10

73.10

58.00

174.00

73.80

73.80

64.70

323.50

80.10

320.40

3027.90

148.49

296.98

148.49

148.49

165.59

496.76

165.59

165.59

174.14

870.68

174.14

696.54

11496.67

34.20

68.40

60.10

60.10

54.90

164.70

76.30

76.30

54.90

274.50

88.50

354.00

2092.40

11.40

22.80

20.00

20.00

15.00

45.00

25.40

25.40

18.30

91.50

29.50

118.00

669.50

85.60

171.20

127.60

127.60

101.20

303.60

128.80

128.80

112.50

562.50

139.50

558.00

5430.90

84

Executive Engineer, PWD


Nagaon NH Division, Nagaon

85

Statement No.- 5 A

Quantity Calculation of R.C.C.Box Cell 2.00m x 2.00m


Estimate of Quantity for 2.00m x 2.00 m (with earth cushion) single cell box culvert
Span of Culvert =
2.00 m
Height of Culvert =
2.00 m
Base Slab
0.38 m
Top Slab
0.350 m
Vertical wall
0.300 m
Projection of base
0.500 m
Height of Fill =
1.500 m
Length of Box =
32.00 m
Item No.
1

Description

Nos.

Length(m) Breadth(m) Height(m)

Quantity

Excavation
Box Culvert

Excavation for back filling

32.00

3.80

1.85

224.96

3.80

0.38

0.35

1.00

32.00

1.58

2.35

237.39

Total
2

unit

PCC Below Box Culvert

Cum

463.35

32.00

3.10

0.15

14.88

3.80

0.49

0.15

0.56

Total

Cum

15.44

3 RCC
Bottom Slab

32.00

3.00

0.38

Cum

36.48

Vertical Wall

32.00

0.300

2.00

Cum

38.4

Haunge

32.00

0.075

0.15

Cum

1.44

3.60

0.45

0.3

Cum

0.972

Top Slab

32.00

2.6

0.350

Cum

29.12

Wheel guard

9.60

0.35

0.225

Cum

1.512

Approach slab chair

32.00

0.375

0.3

Cum

Cum

107.92

Ton

7.088

2.35

Cum

237.39

Total

Cum

237.39

Rm

19.20

Reinforcement (Qty as per DWG )

Backfilling behind
abutment,

32.00

1.58

Railing

9.60

PCC M15 Below app.


Slab
RCC Approach Slab

3.50

32.00

0.15

Cum

0.00

3.50

32.00

0.30

Cum

0.00

9
10

Asphalt plug joint

0
0

2
32.00

32.00
9.60

Rm
Sqm

0.00
0.00

11

Excavation
wing wall ( high end)

4
4
4

0.73
1.85
0.26

4.62
2.25
2.05

Cum
Cum
Cum

22.11
27.44
3.50

8
Wearing Coat
Wing Wall

1.65
1.65
1.65

84

11

Item No.

Description
wing wall ( low end)

12

13
14
15

16

PCC M-15

18

1.24

2.05

4
4

0.73
1.85

4
4

unit
Cum

Quantity

4.62
2.25

1.65
Total
0.15
0.15

Cum
Cum
Cum

16.79
69.85
2.01
2.49

0.26

2.05

0.15

Cum

0.32

1.24

2.05

0.15

Cum

1.53

Total

Cum

6.35

Cum
No

44.03
32.00

Qty as per MOST DWG No SD/113 ( Sheet No.4)


4
8
Providing weep holes
Curtain Wall
E/W in Excavation
1
7.00
D/S
1
7.00
U/S
PCC M-15

Apron
E/w in Excavation

PCC M-15
PCC M-15

19
20

Length(m) Breadth(m) Height(m)

PCC M-20

PCC M-15

17

Nos.

Stone Embaded in C.C


Flexible Apron

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.3)

Cum
Cum
Cum

32.375
21.00
53.375
3.50

Cum

23.60
27.10

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

76.94
21
42
139.94
3.8

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

7.6
11.4
3.4
47.2

Qty as per MOST DWG No SD/111 ( Sheet No.3)


Total
2
1
1

11.40
7.00
7.00

4.50
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

85

Statement No.- 5 B

Quantity Calculation of R.C.C.Box Cell 2.00m x 2.00m


Estimate of Quantity for 2.00m x 2.00 m (with earth cushion) single cell box culvert
Span of Culvert =
2.00 m
Height of Culvert =
2.00 m
Base Slab
0.38 m
Top Slab
0.350 m
Vertical wall
0.300 m
Projection of base
0.500 m
Height of Fill =
1.500 m
Length of Box =
34.00 m
Item No.
1

Description

Nos.

Length(m) Breadth(m) Height(m)

Quantity

Excavation
Box Culvert

Excavation for back filling

34.00

3.80

1.85

239.02

3.80

0.38

0.35

1.00

34.00

1.58

2.35

252.23

Total
2

unit

PCC Below Box Culvert

Cum

492.24

34.00

3.10

0.15

15.81

3.80

0.49

0.15

0.56

Total

Cum

16.37

3 RCC
Bottom Slab

34.00

3.00

0.38

Cum

38.76

Vertical Wall

34.00

0.300

2.00

Cum

40.8

Haunge

34.00

0.075

0.15

Cum

1.53

3.60

0.45

0.3

Cum

0.972

Top Slab

34.00

2.6

0.350

Cum

30.94

Wheel guard

9.60

0.35

0.225

Cum

1.512

Approach slab chair

34.00

0.375

0.3

Cum

Cum

114.51

Ton

7.518

2.35

Cum

252.23

Total

Cum

252.23

Rm

19.20

Reinforcement (Qty as per DWG )

Backfilling behind
abutment,

34.00

1.58

Railing

9.60

PCC M15 Below app.


Slab
RCC Approach Slab

3.50

34.00

0.15

Cum

0.00

3.50

34.00

0.30

Cum

0.00

9
10

Asphalt plug joint

0
0

2
34.00

34.00
9.60

Rm
Sqm

0.00
0.00

11

Excavation
wing wall ( high end)

4
4
4

0.73
1.85
0.26

4.62
2.25
2.05

Cum
Cum
Cum

22.11
27.44
3.50

8
Wearing Coat
Wing Wall

1.65
1.65
1.65

86

11

Item No.

Description
wing wall ( low end)

12

13
14
15

16

PCC M-15

18

1.24

2.05

4
4

0.73
1.85

4
4

unit
Cum

Quantity

4.62
2.25

1.65
Total
0.15
0.15

Cum
Cum
Cum

16.79
69.85
2.01
2.49

0.26

2.05

0.15

Cum

0.32

1.24

2.05

0.15

Cum

1.53

Total

Cum

6.35

Cum
No

44.03
32.00

Qty as per MOST DWG No SD/113 ( Sheet No.4)


4
8
Providing weep holes
Curtain Wall
E/W in Excavation
1
7.00
D/S
1
7.00
U/S
PCC M-15

Apron
E/w in Excavation

PCC M-15
PCC M-15

19
20

Length(m) Breadth(m) Height(m)

PCC M-20

PCC M-15

17

Nos.

Stone Embaded in C.C


Flexible Apron

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.3)

Cum
Cum
Cum

32.375
21.00
53.375
3.50

Cum

23.60
27.10

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

76.94
21
42
139.94
3.8

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

7.6
11.4
3.4
47.2

Qty as per MOST DWG No SD/111 ( Sheet No.3)


Total
2
1
1

11.40
7.00
7.00

4.50
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

87

Statement No.- 5 C

Quantity Calculation of R.C.C.Box Cell 2.00m x 2.00m


Estimate of Quantity for 2.00m x 2.00 m (with earth cushion) single cell box culvert
Span of Culvert =
2.00 m
Height of Culvert =
2.00 m
Base Slab
0.38 m
Top Slab
0.350 m
Vertical wall
0.300 m
Projection of base
0.500 m
Height of Fill =
1.500 m
Length of Box =
52.00 m
Item No.
1

Description

Nos.

Length(m) Breadth(m) Height(m)

Quantity

Excavation
Box Culvert

Excavation for back filling

52.00

3.80

1.85

365.56

3.80

0.38

0.35

1.00

52.00

1.58

2.35

385.76

Total
2

unit

PCC Below Box Culvert

Cum

752.32

52.00

3.10

0.15

24.18

3.80

0.49

0.15

0.56

Total

Cum

24.74

3 RCC
Bottom Slab

52.00

3.00

0.38

Cum

59.28

Vertical Wall

52.00

0.300

2.00

Cum

62.4

Haunge

52.00

0.075

0.15

Cum

2.34

3.60

0.45

0.3

Cum

0.972

Top Slab

52.00

2.6

0.350

Cum

47.32

Wheel guard

9.60

0.35

0.225

Cum

1.512

Approach slab chair

52.00

0.375

0.3

Cum

Cum

173.82

Ton

11.391

2.35

Cum

385.76

Total

Cum

385.76

Rm

19.20

Reinforcement (Qty as per DWG )

Backfilling behind
abutment,

Railing

9.60

PCC M15 Below app.


Slab
RCC Approach Slab

3.50

52.00

0.15

Cum

0.00

3.50

52.00

0.30

Cum

0.00

9
10

Asphalt plug joint

0
0

2
52.00

52.00
9.60

Rm
Sqm

0.00
0.00

11

Excavation
wing wall ( high end)

4
4
4

0.73
1.85
0.26

4.62
2.25
2.05

Cum
Cum
Cum

22.11
27.44
3.50

52.00

1.58

8
Wearing Coat
Wing Wall

1.65
1.65
1.65

88

11

Item No.

Description
wing wall ( low end)

12

13
14
15

16

PCC M-15

18

PCC M-15

Apron
E/w in Excavation

PCC M-15
PCC M-15

19
20

Length(m) Breadth(m) Height(m)

1.24

2.05

4
4

0.73
1.85

4.62
2.25

4
4

0.26
1.24

2.05
2.05

PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.4)
4
8
Providing weep holes
Curtain Wall
E/W in Excavation
1
7.00
D/S
1
7.00
U/S

PCC M-15

17

Nos.

Stone Embaded in C.C


Flexible Apron

1.65
Total
0.15
0.15
0.15
0.15
Total

unit
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
No

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.3)

Cum
Cum
Cum

Quantity
16.79
69.85
2.01
2.49
0.32
1.53
6.35
44.03
32.00

32.375
21.00
53.375
3.50

Cum

23.60
27.10

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

76.94
21
42
139.94
3.8

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

7.6
11.4
3.4
47.2

Qty as per MOST DWG No SD/111 ( Sheet No.3)


Total
2
1
1

11.40
7.00
7.00

4.50
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

89

Statement No.- 5 D

Quantity Calculation of R.C.C.Box Cell 3.00m x 3.00m


Estimate of Quantity for 3.00m x 3.00 m (without earth cushion) single cell box culvert
Span of Culvert =
3.00 m
Height of Culvert =
3.00 m
Base Slab
0.42 m
Top Slab
0.420 m
Vertical wall
0.420 m
Projection of base
0.900 m
Length of Box =
26.00 m

Item No.
1

Description

Length(m)

1
2
2

26.00
5.84
26.00

Breadth(m) Height(m)

unit

Quantity

Cum

Cum

356.82
1.53
335.63
693.99
20.05
0.87
20.91

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm

52.416
65.52
1.17
1.5228
41.9328
1.7073
5.85
170.12
11.025
335.63
335.63
21.68
27.30
54.60
52.00
21.14

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

22.11
27.44
3.50
16.79
69.85
2.01
2.49
0.32
1.53
6.35

Cum

99.80

Excavation
Box Culvert
Excavation for back filling

Nos.

PCC Below Box Culvert

3 RCC
Bottom Slab
Vertical Wall
Haunge
Top Slab
Wheel guard
Approach slab chair

1
2

1
2
4
2
1
2
2

4.80
0.420
0.075
0.45
3.84
0.35
0.375

0.42
3.00
0.15
0.3
0.420
0.225
0.3

26.00

1.89

3.42
Total

2
2
2
1
1

10.84
3.50
3.50
2
26.00

26.00
26.00
26.00
10.84

0.15
0.30

4
4
4
4

0.73
1.85
0.26
1.24

4.62
2.25
2.05
2.05

1.65
1.65
1.65
1.65
Total
0.15
0.15
0.15
0.15
Total

Reinforcement (Qty as per DWG )


Backfilling behind
2
abutment,

6
7
8

Railing
PCC M15 Below app.
Slab
RCC Approach Slab

9
10

Asphalt plug joint

11 Excavation
wing wall ( high end)

wing wall ( low end)


12 PCC M-15

5.14
0.49

2.35
0.35
3.42
Total
0.15
0.15
Total

26.00
26.00
26.00
5.64
26.00
10.84
26.00

4
5

Wearing Coat
Wing Wall

26.00
5.84

5.84
0.38
1.89

4
4
4
4

0.73
1.85
0.26
1.24

13 PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)

4.62
2.25
2.05
2.05

0.08

90

Item No.
14

Description
Providing weep holes

Nos.
4

Length(m) Breadth(m) Height(m)


12

unit
No

Quantity
48.00

91

Item No.

Description

Nos.

Curtain Wall
15 E/W in Excavation
D/S
U/S
16 PCC M-15
PCC M-15
Apron
17 E/w in Excavation

18 PCC M-15
PCC M-15
19
20

Stone Embaded in C.C


Flexible Apron

Length(m)

1
1

7.00
7.00

Breadth(m) Height(m)

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)

unit

Cum
Cum
Cum

Quantity

32.375
21.00
53.375
5.80

Cum

38.60
44.40

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

85.49
21
42
148.49
11.4

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

22.8
34.2
11.4
85.6

Qty as per MOST DWG No SD/111 ( Sheet No.4)


Total
2
1
1

11.40
7.00
7.00

5.00
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

92

Statement No.- 5 E

Quantity Calculation of R.C.C.Box Cell 3.00m x 3.00m


Estimate of Quantity for 3.00m x 3.00 m (without earth cushion) single cell box culvert
Span of Culvert =
3.00 m
Height of Culvert =
3.00 m
Base Slab
0.42 m
Top Slab
0.420 m
Vertical wall
0.420 m
Projection of base
0.900 m
Length of Box =
44.00 m

Item No.
1

Description

Length(m)

1
2
2

44.00
5.84
44.00

Breadth(m) Height(m)

unit

Quantity

Cum

Cum

603.86
1.53
567.99
1173.38
33.92
0.87
34.79

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm

88.704
110.88
1.98
1.5228
70.9632
1.7073
9.9
285.66
19.739
567.99
567.99
21.68
46.20
92.40
88.00
35.77

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

22.11
27.44
3.50
16.79
69.85
2.01
2.49
0.32
1.53
6.35

Cum

99.80

Excavation
Box Culvert
Excavation for back filling

Nos.

PCC Below Box Culvert

3 RCC
Bottom Slab
Vertical Wall
Haunge
Top Slab
Wheel guard
Approach slab chair

1
2

1
2
4
2
1
2
2

4.80
0.420
0.075
0.45
3.84
0.35
0.375

0.42
3.00
0.15
0.3
0.420
0.225
0.3

44.00

1.89

3.42
Total

2
2
2
1
1

10.84
3.50
3.50
2
44.00

44.00
44.00
44.00
10.84

0.15
0.30

4
4
4
4

0.73
1.85
0.26
1.24

4.62
2.25
2.05
2.05

1.65
1.65
1.65
1.65
Total
0.15
0.15
0.15
0.15
Total

Reinforcement (Qty as per DWG )


Backfilling behind
2
abutment,

6
7
8

Railing
PCC M15 Below app.
Slab
RCC Approach Slab

9
10

Asphalt plug joint

11 Excavation
wing wall ( high end)

wing wall ( low end)


12 PCC M-15

5.14
0.49

2.35
0.35
3.42
Total
0.15
0.15
Total

44.00
44.00
44.00
5.64
44.00
10.84
44.00

4
5

Wearing Coat
Wing Wall

44.00
5.84

5.84
0.38
1.89

4
4
4
4

0.73
1.85
0.26
1.24

13 PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)

4.62
2.25
2.05
2.05

0.08

92

Item No.
14

Description
Providing weep holes

Nos.
4

Length(m) Breadth(m) Height(m)


12

unit
No

Quantity
48.00

93

Item No.

Description

Nos.

Curtain Wall
15 E/W in Excavation
D/S
U/S
16 PCC M-15
PCC M-15
Apron
17 E/w in Excavation

18 PCC M-15
PCC M-15
19
20

Stone Embaded in C.C


Flexible Apron

Length(m)

1
1

7.00
7.00

Breadth(m) Height(m)

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)

unit

Cum
Cum
Cum

Quantity

32.375
21.00
53.375
5.80

Cum

38.60
44.40

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

85.49
21
42
148.49
11.4

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

22.8
34.2
11.4
85.6

Qty as per MOST DWG No SD/111 ( Sheet No.4)


Total
2
1
1

11.40
7.00
7.00

5.00
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

94

Statement No.- 7 F

Quantity Calculation of R.C.C.Box Cell 3.00m x 3.00m


Estimate of Quantity for 3.00m x 3.00 m (with earth cushion) Triple cell box culvert
Span of Culvert =
3.00 m
Height of Culvert =
3.00 m
Base Slab
0.4 m
Top Slab
0.350 m
Vertical wall
0.350 m
g
0.250
Projection of base
0.300 m
Height of Fill =
3.000 m
Length of Box =
38.00 m
Item No.
1

No.of cell
Description

Excavation for back filling

PCC Below Box Culvert

RCC
Bottom Slab
Vertical Wall
Vertical Wall MID
Haunge
APP SLAB CHAIR
BOTTOM SLAB CUT OFF
Top Slab
Wheel guard
Approach slab chair

1
2
2
1
2

1
2
2
12
2
2
1
2
0

1.87

3.35
Total

2
0
0
0
0

10.70
3.50
3.50
2
38.00

38.00
38.00
38.00
10.70

0.15
0.30

4
4
4
4

0.73
1.85
0.26
1.24

4.62
2.25
2.05
2.05

4
4
4

0.73
1.85
0.26

4.62
2.25
2.05

Railing
PCC M15 Below app.
Slab
RCC Approach Slab
Wearing Coat
Wing Wall

11

Excavation
wing wall ( high end)

wing wall ( low end)


12

PCC M-15

10.30
0.49

2.35
0.35
3.35
Total
0.15
0.15
Total

38.00

Asphalt plug joint

38.00
11.00

11.00
0.38
1.87

3.60
0.350
0.250
0.075
0.45
0.55
3.7
0.35
0.375

Reinforcement (Qty as per DWG )


Backfilling behind
2
abutment,

10

38.00
11.00
38.00

38.00
38.00
38.00
38.00
10.20
10.8
38.00
10.70
38.00

4
5

7
8
9

Breadth(m) Height(m)

unit

Quantity

Cum

982.30
2.89
475.35
1460.54
58.71
1.63
60.34

Excavation
Box Culvert

3.000 Nos
Nos.
Length(m)

0.4
3.00
3.00
0.15
0.3

Cum

0.075

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm

54.72
79.80
57.00
5.13
2.75
3.56
49.21
1.69
0
253.86
23.513
475.35
475.35
21.40
0.00
0.00
0.00
0.00

1.65
1.65
1.65
1.65
Total
0.15
0.15
0.15

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

22.11
27.44
3.50
16.79
69.85
2.01
2.49
0.32

0.3
0.350
0.225
0.3

Cum
Cum

94

Item No.

Description

Nos.

Length(m)

1.24

Breadth(m) Height(m)
2.05

0.15
Total

unit

Quantity

Cum
Cum

1.53
6.35

95

Item No.
13

Description

Nos.

Length(m)

14

PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.5)
4
12
Providing weep holes

15

Curtain Wall
E/W in Excavation
D/S
U/S

16

PCC M-15
PCC M-15

17

Apron
E/w in Excavation

18

PCC M-15
PCC M-15

19
20

Stone Embaded in C.C


Flexible Apron

1
1

7.00
7.00

Breadth(m) Height(m)

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.3)

unit

Quantity

Cum
No

99.18
48.00

Cum
Cum
Cum

32.375
21.00
53.375
9.50

Cum

63.60
73.10

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

85.49
21
42
148.49
20

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

40.1
60.1
20
127.6

Qty as per MOST DWG No SD/111 ( Sheet No.3)


Total
2
1
1

11.40
7.00
7.00

5.00
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

96

Statement No.- 5 G
Quantity Calculation of R.C.C.Box Cell 5.00m x 3.00m
Estimate of Quantity for 5.00m x 3.00 m (without earth cushion) single cell box culvert
Span of Culvert =
5.00 m
Height of Culvert =
3.00 m
Base Slab
0.57 m
Top Slab
0.500 m
Vertical wall
0.570 m
Projection of base
0.300 m
Length of Box =
26.00 m
Item No.
1

Description

Length(m) Breadth(m) Height(m)

unit

Quantity

Cum

Cum

424.03
1.82
347.69
773.54
24.34
1.03
25.37
82.992
88.92
1.17
1.8198
79.82
2.06955
5.85
262.64
21.206
347.69
347.69
26.28
27.30
54.60
52.00
25.62

Excavation
Box Culvert
Excavation for back filling

Nos.

PCC Below Box Culvert

3 RCC
Bottom Slab
Vertical Wall
Haunge

1
2
2
1
2

26.00
6.94
26.00
26.00
6.94

6.94
0.38
1.91
6.24
0.49

2.35
0.35
3.50
Total
0.15
0.15
Total

1
2
4
2
1
2
2

26.00
26.00
26.00
6.74
26.00
13.14
26.00

5.60
0.570
0.075
0.45
6.14
0.35
0.375

0.57
3.00
0.15
0.3
0.500
0.225
0.3

4
5

Reinforcement (Qty as per DWG )


Backfilling behind
2
abutment,

26.00

1.91

3.50
Total

6
7
8

Railing
PCC M15 Below app. Slab
RCC Approach Slab

Asphalt plug joint

13.14
3.50
3.50
2
26.00

26.00
26.00
26.00
13.14

0.15
0.30

9
10

2
2
2
1
1

0.08

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm

11

Excavation
wing wall ( high end)

4
4
4
4

4.54
6.520
0.26
1.24

13.59
4.54
2.05
2.05

4
4
4
4

4.54
6.52
0.26
1.24

13.59
4.54
2.05
2.05

2.15
2.15
2.15
2.15
Total
0.15
0.15
0.15
0.15
Total

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

530.63
254.71
4.57
21.88
811.78
37.02
17.77
0.32
1.53
56.64

Cum

108.79

Top Slab
Wheel guard
Approach slab chair

Wearing Coat
Wing Wall

wing wall ( low end)


12

PCC M-15

13

PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)

96

Item No.
Description
14
Providing weep holes

Nos.
4

Length(m) Breadth(m) Height(m)


20

unit
No

Quantity
80.00

97

Item No.
15

Description

Nos.

Curtain Wall
E/W in Excavation
D/S
U/S

16

PCC M-15
PCC M-15

17

18

Apron
E/w in Excavation

PCC M-15
PCC M-15

19
20

Stone Embaded in C.C


Flexible Apron

Length(m) Breadth(m) Height(m)

1
1

7.00
7.00

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)

unit

Cum
Cum
Cum

Quantity

32.375
21.00
53.375
7.50

Cum

50.50
58.00

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

102.59
21
42
165.59
18.3

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

36.6
54.9
15
101.2

Qty as per MOST DWG No SD/111 ( Sheet No.4)


Total
2
1
1

11.40
7.00
7.00

6.00
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

98

Statement No.- 5 H
Quantity Calculation of R.C.C.Box Cell 5.00m x 4.00m
Estimate of Quantity for 5.00m x 4.00 m (without earth cushion) single cell box culvert
Span of Culvert =
5.00 m
Height of Culvert =
4.00 m
Base Slab
0.6 m
Top Slab
0.520 m
Vertical wall
0.620 m
Projection of base
0.800 m
Length of Box =
26.00 m
Item No.
1

Description

Length(m) Breadth(m) Height(m)

unit

Quantity

Cum

Cum

595.76
2.11
518.22
1116.09
28.63
1.19
29.82
102.96
128.96
1.17
2.1168
84.3648
2.0853
5.85
327.51
22.550
518.22
518.22
26.48
27.30
54.60
52.00
25.82

Excavation
Box Culvert
Excavation for back filling

Nos.

PCC Below Box Culvert

3 RCC
Bottom Slab
Vertical Wall
Haunge

1
2
2
1
2

26.00
8.04
26.00
26.00
8.04

8.04
0.38
2.20
7.34
0.49

2.85
0.35
4.52
Total
0.15
0.15
Total

1
2
4
2
1
2
2

26.00
26.00
26.00
7.84
26.00
13.24
26.00

6.60
0.620
0.075
0.45
6.24
0.35
0.375

0.6
4.00
0.15
0.3
0.520
0.225
0.3

4
5

Reinforcement (Qty as per DWG )


Backfilling behind
2
abutment,

26.00

2.20

4.52
Total

6
7
8

Railing
PCC M15 Below app. Slab
RCC Approach Slab

Asphalt plug joint

13.24
3.50
3.50
2
26.00

26.00
26.00
26.00
13.24

0.15
0.30

9
10

2
2
2
1
1

0.08

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm

11

Excavation
wing wall ( high end)

4
4
4
4

4.54
6.520
0.26
1.24

13.59
4.54
2.05
2.05

4
4
4
4

4.54
6.52
0.26
1.24

13.59
4.54
2.05
2.05

2.15
2.15
2.15
2.15
Total
0.15
0.15
0.15
0.15
Total

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

530.63
254.71
4.57
21.88
811.78
37.02
17.77
0.32
1.53
56.64

Cum

196.32

Top Slab
Wheel guard
Approach slab chair

Wearing Coat
Wing Wall

wing wall ( low end)


12

PCC M-15

13

PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)

98

Item No.
Description
14
Providing weep holes

Nos.
4

Length(m) Breadth(m) Height(m)


20

unit
No

Quantity
80.00

99

Item No.
15

Description

Nos.

Curtain Wall
E/W in Excavation
D/S
U/S

16

PCC M-15
PCC M-15

17

18

Apron
E/w in Excavation

PCC M-15
PCC M-15

19
20

Stone Embaded in C.C


Flexible Apron

Length(m) Breadth(m) Height(m)

1
1

7.00
7.00

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)

unit

Cum
Cum
Cum

Quantity

32.375
21.00
53.375
9.60

Cum

64.20
73.80

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

102.59
21
42
165.59
25.4

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

50.9
76.3
25.4
128.8

Qty as per MOST DWG No SD/111 ( Sheet No.4)


Total
2
1
1

11.40
7.00
7.00

6.00
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

100

Statement No.- 5 I
Quantity Calculation of R.C.C.Box Cell 6.00m x 3.00m
Estimate of Quantity for 6.00m x 3.00 m (without earth cushion) single cell box culvert
Span of Culvert =
6.00 m
Height of Culvert =
3.00 m
Base Slab
0.72 m
Top Slab
0.680 m
Vertical wall
0.720 m
Projection of base
0.300 m
Length of Box =
26.00 m
Item No.
1

Description

Length(m) Breadth(m) Height(m)

unit

Quantity

Cum

Cum

503.46
2.16
375.51
881.14
29.41
1.22
30.63
123.552
112.32
1.17
2.1708
131.5392
2.2743
5.85
378.88
23.724
375.51
375.51
28.88
27.30
54.60
52.00
28.16

Excavation
Box Culvert
Excavation for back filling

Nos.

PCC Below Box Culvert

3 RCC
Bottom Slab
Vertical Wall
Haunge
Below Bottom Slab
Top Slab
Wheel guard
Approach slab chair

1
2
2
1
2

26.00
8.24
26.00
26.00
8.24

8.24
0.38
1.96
7.54
0.49

2.35
0.35
3.68
Total
0.15
0.15
Total

1
2
4
2
1
2
2

26.00
26.00
26.00
8.04
26.00
14.44
26.00

6.60
0.720
0.075
0.45
7.44
0.35
0.375

0.72
3.00
0.15
0.3
0.680
0.225
0.3

4
5

Reinforcement (Qty as per DWG )


Backfilling behind
2
abutment,

26.00

1.96

3.68
Total

6
7
8

Railing
PCC M15 Below app. Slab
RCC Approach Slab

Asphalt plug joint

14.44
3.50
3.50
2
26.00

26.00
26.00
26.00
14.44

0.15
0.30

9
10

2
2
2
1
1

0.08

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm

11

Excavation
wing wall ( high end)

4
4
4
4

4.54
6.520
0.26
1.24

13.59
4.54
2.05
2.05

4
4
4
4

4.54
6.52
0.26
1.24

13.59
4.54
2.05
2.05

2.15
2.15
2.15
2.15
Total
0.15
0.15
0.15
0.15
Total

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

530.63
254.71
4.57
21.88
811.78
37.02
17.77
0.32
1.53
56.64

Cum

121.04

Wearing Coat
Wing Wall

wing wall ( low end)


12

PCC M-15

13

PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)

100

Item No.
Description
14
Providing weep holes

Nos.

Length(m) Breadth(m) Height(m)


4
24

unit
No

Quantity
96.00

101

Item No.
15

Description

Nos.

PCC M-15
PCC M-15

17

18

Apron
E/w in Excavation

PCC M-15
PCC M-15

19
20

unit

Quantity

Curtain Wall
E/W in Excavation
D/S
U/S

16

Length(m) Breadth(m) Height(m)

Stone Embaded in C.C


Flexible Apron

1
1

7.00
7.00

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum

32.375
21.00
53.375
8.40

Cum

56.30
64.70

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

111.14
21
42
174.14
18.3

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

36.6
54.9
18.3
112.5

Qty as per MOST DWG No SD/111 ( Sheet No.4)


Total
2
1
1

11.40
7.00
7.00

6.50
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

102

Statement No.- 5 J
Quantity Calculation of R.C.C.Box Cell 6.00m x 4.00m
Estimate of Quantity for 6.00m x 4.00 m (without earth cushion) single cell box culvert
Span of Culvert =
6.00 m
Height of Culvert =
4.00 m
Base Slab
0.72 m
Top Slab
0.680 m
Vertical wall
0.750 m
Projection of base
0.300 m
Length of Box =
26.00 m
Item No.
1

Description

Length(m) Breadth(m) Height(m)

unit

Quantity

Cum

Cum

615.03
2.18
547.80
1165.01
29.64
1.23
30.87
123.552
156
1.17
2.187
132.6
2.28375
5.85
423.64
29.273
547.80
547.80
29.00
27.30
54.60
52.00
28.28

Excavation
Box Culvert
Excavation for back filling

Nos.

PCC Below Box Culvert

3 RCC
Bottom Slab
Vertical Wall
Haunge
Below Bottom Slab
Top Slab
Wheel guard
Approach slab chair

1
2
2
1
2

26.00
8.30
26.00
26.00
8.30

8.30
0.38
2.25
7.60
0.49

2.85
0.35
4.68
Total
0.15
0.15
Total

1
2
4
2
1
2
2

26.00
26.00
26.00
8.10
26.00
14.50
26.00

6.60
0.750
0.075
0.45
7.5
0.35
0.375

0.72
4.00
0.15
0.3
0.680
0.225
0.3

4
5

Reinforcement (Qty as per DWG )


Backfilling behind
2
abutment,

26.00

2.25

4.68
Total

6
7
8

Railing
PCC M15 Below app. Slab
RCC Approach Slab

Asphalt plug joint

14.50
3.50
3.50
2
26.00

26.00
26.00
26.00
14.50

0.15
0.30

9
10

2
2
2
1
1

0.08

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm

11

Excavation
wing wall ( high end)

4
4
4
4

4.54
6.520
0.26
1.24

13.59
4.54
2.05
2.05

4
4
4
4

4.54
6.52
0.26
1.24

13.59
4.54
2.05
2.05

2.15
2.15
2.15
2.15
Total
0.15
0.15
0.15
0.15
Total

Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum

530.63
254.71
4.57
21.88
811.78
37.02
17.77
0.32
1.53
56.64

Cum

214.14

Wearing Coat
Wing Wall

wing wall ( low end)


12

PCC M-15

13

PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)

102

Item No.
Description
14
Providing weep holes

Nos.
4

Length(m) Breadth(m) Height(m)


24

unit
No

Quantity
96.00

103

Item No.
15

Description

Nos.

Curtain Wall
E/W in Excavation
D/S
U/S

16

PCC M-15
PCC M-15

17

18

Apron
E/w in Excavation

PCC M-15
PCC M-15

19
20

Stone Embaded in C.C


Flexible Apron

Length(m) Breadth(m) Height(m)

1
1

7.00
7.00

1.85
1.5

2.5
2.0

Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)

unit

Cum
Cum
Cum

Quantity

32.375
21.00
53.375
10.40

Cum

69.70
80.10

Total
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum
Cum

111.14
21
42
174.14
29.5

Qty as per DWG No SD/111 ( Sheet No.4)


Total
Qty as per DWG No SD/111 ( Sheet No.4)
Qty as per DWG No SD/111 ( Sheet No.4)

Cum
Cum
Cum
Cum

59
88.5
29.5
139.5

Qty as per MOST DWG No SD/111 ( Sheet No.4)


Total
2
1
1

11.40
7.00
7.00

6.50
3.0
6.0

0.75
1.00
1.00

Executive Engineer, PWD


Nagaon NH Division

104

Statement No -10
Quantity for drain cum footpath
Sl.No.
1

From
Ch
2

To
Ch.
3

Side
4

Unit

Length
in M
5

RCC Drain 1.50 m


1

226700

227455

R.H.S.

RM

755.00

226700

227455

L.H.S.

RM

755.00

228100

229321

R.H.S.

RM

1221.00

228100

229321

L.H.S.

RM

1221.00

246200

247100

R.H.S.

RM

900.00

246200

247100

L.H.S.

RM

900.00

248200

249145

R.H.S.

RM

945.00

248200

249145

L.H.S.

RM

945.00

262677

263469

R.H.S.

RM

792.00

10

262677

263569

L.H.S.

RM

892.00

11

263682

264850

L.H.S.

RM

1168.00

12

263800

264850

R.H.S.

RM

1050.00

Total =

11544.00

Executive Engineer, PWD


Nagaon NH Division,
Nagaon

130

Appendix C.26 e : Single Cell RCC Box Culvert of size 3 x 2 (U/S & D/S Pitching)
Sl.N
Descriptions
o.
1 Excavation
Box Portion
L=3.0+2x0.42+2x0.90+2x0.10 = 5.84 m
Width = 12 m
Depth = 1.0 m from natural ground level
For Key portion
L=3.0+2x0.42+2x0.90+2x0.10 = 5.84 m
Area = (0.30x0.63)+(0.50x0.63x0.63) = 0.388
No. = 2
Wing wall
Length of wing wall = 3.82 m
Depth of Foundation = 1.50 m
Width = (2.25+ 3.2)/2 = 2.73 m
(Refer MOST Dwq. No. SD/113 sheet 6 of 6)
No. = 4
For Return wall
Length of Return wall = 1.4 + 0.1 = 1.5m
Width = 2.05 m
Depth = 1.50 m
No. = 4
Total
2

cum

cum

5.84

12.00

1.00

5.84

0.39

cum

3.82

2.73

1.50

cum

1.50

2.05

1.50

5.84

12.00

0.15

sqm

Levelling course plain cement concrete grade


M-15 in foundation.
Box Portion
L=3.0+2x0.42+2x0.90+2x0.10 = 5.84 m
Width = 12 m
Thick = 0.15 m
Wing wall
Length of wing wall = 3.82 m
Depth of PCC = 0.15 m
Width = (2.25+ 3.2)/2 = 2.73 m
(Refer MOST Dwq. No. SD/113 sheet 6 of 6)
No. = 4
For Return wall

Unit No. Length Width Ht./Th. Area

Length of Return wall = 1.4 + 0.1 = 1.5m


Width = 2.05 m
Depth = 0.15 m
No. = 4
Total
Box Portion
RCC grade M-25
(Refer MOST Dwg. No. SD/108 sheet 2 of 6)
Wing wall
PCC grade M-20
(Refer MOST Dwg. No. SD/113 sheet 6 of 6)
Return Wall
Length = 1.4 m
Area =
(1.81x0.50)+(0.50x0.46x0.24)+(0.50x0.85x(0.
85+0.3)+(0.50x0.30)+(0.40x0.35) =
0.905+0.055+0.50+0.15+0.14 = 1.75 sqm
No. = 4

cum

cum

3.82

2.73

0.15

cum

1.50

2.05

0.15

1.40

cum

cum
cum

1.75

10

11
12

13
14
15
16

Total
Approach slab
I. Levelling course M-15 concrete
L= 3.50 m
W = 12m
Thick = 0.15m
No. = 4
II. RCC M-30 grade concrete
L= 3.50 m
W = 12m
Thick = 0.3m
No. = 4
RCC M 40 Crash Barriers
No. = 2
L = 3+2x0.42+2x3.5 = 10.84 m
Filling with Filter media (Both side)
a) For Box Portion
No. =2
L= 0.6m
W = 12m
Ht. = 1.4m
b) For wing wall
Length of wing wall = 3.82 m
Ave.Ht. = (3.55+2.15)/2 = 2.85 m
Width = 0.60 m
No. = 4
Total
Stone pitching for Floor Apron
a) 150 mm thick PCC M-15
b) 300 mm thick concrete
c) 150 mm thick Flat Stone
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
Stone pitching for Flexible Apron
750 mm thick Stone
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
Curtain Wall
a) PCC under curtain wall
c) Concrete for D/S curtain wall
d) Concrete for U/S curtain wall
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
Tar Paper Bearing
Backfilling behind Abutment, wing wall etc.
a) Behind Abutment
b) Behind Wing wall
Total
Expansion joint
Drainage Spout
Weap holes
Reinforcement (As per MOST)
a) For Box Portion

cum

3.50

12.00

0.15

cum

3.50

12.00

0.30

Lm

10.84

cum

0.60

12.00

1.40

cum

3.82

0.60

2.85

sqm

12.00

0.30

cum
cum

2
4

12.00
3.82

3.50
3.50

Mtr.
No.
No.

12.00

cum
cum
cum

cum

cum
cum
cum

1.70
1.50

MT

Executive Engineer, PWD


Nagaon NH Division, Nagaon

& D/S Pitching)


Quantity
70.080

4.532

62.572

18.450

155.633

10.512

6.257

1.845

18.614
83.920

47.100
9.800

56.900
12.600

25.200

21.680

20.160

26.129

46.289
11.400
22.800
11.400
45.600
85.600

6.400
24.100
18.600
7.200
142.800
80.220
223.020
24.000
2.000
95.000
5.700

ve Engineer, PWD
H Division, Nagaon

Appendix C.26 h : Single Cell RCC Box Culvert of size 3 x 4 (U/S & D/S Pitching)
Sl.
No
Descriptions
.
1 Excavation
Box Portion
L=3.0+2x0.48+2x1.7+2x0.10 = 7.56 m
Width = 12 m
Depth = 1.0 m from natural ground level
For Key portion
L=3.0+2x0.48+2x1.7+2x0.10 = 7.56 m
Area = (0.30x0.63)+(0.50x0.63x0.63) = 0.388
No. = 2
Wing wall
Length of wing wall = 9.76 m
Depth of Foundation = 1.50 m
Width = (5.44+ 7.68)/2 = 6.56 m
(Refer MOST Dwq. No. SD/113 sheet 6 of 6)
No. = 4
For Return wall
Length of Return wall = 1.4 + 0.1 = 1.5m
Width = 2.05 m
Depth = 1.50 m
No. = 4
Total

Uni No Lengt Widt Ht./Th Are


t
.
h
h
.
a
cum

cum

7.56

12.00

1.00

7.56

0.39

cum

9.76

6.56

1.50

cum

1.50

2.05

1.50

7.56

12.00

0.15

sqm

2 Levelling course plain cement concrete grade


M-15 in foundation.
Box Portion
L=3.0+2x0.48+2x1.7+2x0.10 = 7.56 m
Width = 12 m
Thick = 0.15 m
Wing wall
Length of wing wall = 9.76 m
Depth of PCC = 0.15 m
Width = (5.44+ 7.68)/2 = 6.56 m
(Refer MOST Dwq. No. SD/113 sheet 6 of 6)
No. = 4
For Return wall
Length of Return wall = 1.4 + 0.1 = 1.5m
Width = 2.05 m
Depth = 0.15 m
No. = 4
Total
3 Box Portion
RCC grade M-25
(Refer MOST Dwg. No. SD/108 sheet 2 of 6)
4 Wing wall
PCC grade M-20
(Refer MOST Dwg. No. SD/113 sheet 6 of 6)
Return Wall
Length = 1.4 m
Area =
(1.81x0.50)+(0.50x0.46x0.24)+(0.50x0.85x(0.
85+0.3)+(0.50x0.30)+(0.40x0.35) =
0.905+0.055+0.50+0.15+0.14 = 1.75 sqm
No. = 4

cum

cum

9.76

6.56

0.15

cum

1.50

2.05

0.15

1.40

cum

cum
cum

1.75

Total
5 Approach slab
I. Levelling course M-15 concrete
L= 3.50 m
W = 12m
Thick = 0.15m
No. = 4
II. RCC M-30 grade concrete
L= 3.50 m
W = 12m
Thick = 0.3m
No. = 4
6 Crash Barrier
No. = 2
L = 3+2x0.48+2x3.5 = 10.96 m
7 Filling with Filter media (Both side)
a) For Box Portion
No. =2
L= 0.6m
W = 12m
Ht. = 2.4m
b) For wing wall
Length of wing wall = 9.76 m
Ave.Ht. = (5.65+2.15)/2 = 3.90 m
Width = 0.60 m
No. = 4
Total
8 Stone pitching for Floor Apron
a) 150 mm thick PCC M-15
b) 300 mm thick concrete
c) 150 mm thick Flat Stone
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
9 Stone pitching for Flexible Apron
750 mm thick Stone
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
10 Curtain Wall
a) PCC under curtain wall
c) Concrete for D/S curtain wall
d) Concrete for U/S curtain wall
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
11 Tar Paper Bearing
12 Backfilling behind Abutment, wing wall etc.
a) Behind Abutment
b) Behind Wing wall
Total
13 Expansion joint
14 Drainage Spout
15 Weap holes 150 mm dia.
16 Reinforcement (As per MOST)
a) For Box Portion

cum

3.50

12.00

0.15

cum

3.50

12.00

0.30

Lm

10.96

cum

0.60

12.00

2.40

cum

9.76

0.60

3.90

sqm

12.00

0.30

cum
cum

2
4

12.00
9.76

3.50
3.50

Mtr.
No.
No.

12.00

cum
cum
cum

cum

cum
cum
cum

3.40
3.50

MT

Executive Engineer, PWD


Nagaon NH Division, Nagaon

& D/S Pitching)


Quantit
y
90.720

5.867

384.154

18.450

499.190

13.608

38.415

1.845

53.868
124.000

188.770
9.800

198.570
12.600

25.200

21.920

34.560

91.354

125.914
20.500
41.000
20.500
82.000
113.400

8.400
31.900
24.700
7.200
285.600
478.240
763.840
24.000
2.000
120.000
7.540

ve Engineer, PWD