82773m
Culvert type
2/32/0
1/34/0
1/34/0
1/34/0
Unit
Quantity
Rate
(in Rs.)
Amount
(in Rs.)
49853.98
54.00
1591.830
6514.00
10369178.00
13482.453
8917.00
120223030.00
6.2
2692115.00
6.3
Cum
MORT &
Hs
Item
Specific
ation
6.4
Description of Works
Quantity
Rate
(in Rs.)
Amount
(in Rs.)
904.611
73343.00
66346880.00
24089.586
1948.00
46926513.00
Rm
1663.040
2044.00
3399254.00
Metre
1736.000
1861.00
3230696.00
938.700
5498.00
5160973.00
Unit
6.5
6.6
6.7
6.8
Tonn
Rate as per SOR 2013-14
e
Qnty. from Statement No.-5
13.9/710. Back filling behind End wall of abutment,wing
1.4
wall & return wall complete as per Drawing and
Technical
(B) SandySpecification
materials
Rate as per SOR 2013-14
Cum
Qnty. from Statement No.-5,
14.7/ Construction of RCC railing of M30 Grade in-situ
1500, with 20mm nominal size aggregate, true to line
1600, and grade, tolurence of vertical RCC post not to
1700 & exceed 1 in 500, centre to centre spacing
2703 between vertical post not to exceed 2000mm,
leaving adequat space between vertical posts
for expansion, complete as per approved
drawings and technical specifications.
Rate as per SOR 2013-14
Qnty. from Statement No.-5
14.19/
2600
14.10/
2700
10
MORT &
Hs
Item
Specific
ation
6.9
6.10
14.11/
1500,
1600,
1700 &
2704
Unit
Quantity
Rate
(in Rs.)
Amount
(in Rs.)
Cum
1822.800
12025.00
21919170.00
sqm
787.467
688.00
541777.00
Cum
15093.125
54.00
815029.00
Cum
1148.992
6514.00
7484532.00
Cum
5961.180
7482.00
44601549.00
Description of Works
Reinforcement cement concrete approach slab
including reinforcement and formwork complete
as per drawing and technical specification.
(a) With
TATA make TMT CRS (Fe-500) grade rebar
Rate as per SOR 2013-14
Qnty. from Statement No.- 7
Wing Wall
6.11 12.1/ 304 Excavation for Structures (Earth work in
excavation of foundation of structures as per
drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with approved material.
(I) In ordinary Soil
(B) Mechanical means
(b) with dewatering
(i) Depth up to 3m
Rate as per SOR (2009-010)
Qnty. from Statement No.-5,
6.12
12.8 /
1500,
1700 &
2100
11
MORT &
Hs
Item
Specific
ation
6.13
Description of Works
Unit
Quantity
Rate
(in Rs.)
Each
3584.000
204.00
Amount
(in Rs.)
731136.00
12
MORT &
Hs
Item
Specific
ation
Description of Works
Unit
Quantity
Rate
(in Rs.)
4163.250
54.00
3027.900
7046.00
11496.669
54.00
2092.400
6514.00
Amount
(in Rs.)
Curtain Wall
6.14 12.1/ 304 Excavation for Structures (Earth work in
excavation of foundation of structures as per
drawing and technical specification, including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides and bottom and
backfilling with approved material.
6.15
15.10/
2507.2
6.17
224816.00
21334583.00
620820.00
Cum
13629894.00
13
MORT &
Hs
Item
Specific
ation
6.18
6.19
Description of Works
Quantity
Rate
(in Rs.)
669.500
5273.00
Amount
(in Rs.)
Unit
11544.000
3530274.00
8064887.00
381847106.00
#REF!
#REF!
#REF!
14
Analysis No. - 1
Chainage
Borrow Area
Total Lead
in km
Extra lead
Base cost as
beyond 3KM
Total
Average Rate
per 3.16(a)
@ Rs. 7.74per (Col.4+Col.5)
(RS.)
SOR 2013-14
Cum
2
209
2
3
4
5
6
7
3
17
16
15
14
13
12
11
4
201.00
201.00
201.00
201.00
201.00
201.00
201.00
5
108.36
100.62
92.88
85.14
77.40
69.66
61.92
6
309.36
301.62
293.88
286.14
278.40
270.66
262.92
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
10
9
8
7
6
7
8
9
10
11
12
13
14
15
16
17
18
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
201.00
54.18
46.44
38.70
30.96
23.22
30.96
38.70
46.44
54.18
61.92
69.66
77.40
85.14
92.88
100.62
108.36
116.10
255.18
247.44
239.70
231.96
224.22
231.96
239.70
247.44
255.18
262.92
270.66
278.40
286.14
293.88
301.62
309.36
317.10
270.66
Extra lead
beyond 3KM
Total
Average Rate
@ Rs. 8.46 (Col.4+Col.5)
(RS.)
per Cum
Chainage
Borrow Area
Total Lead
in km
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
17
16
15
14
13
12
11
10
9
8
7
6
7
8
9
10
11
12
13
14
15
16
17
18
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
235.00
93.06
84.60
76.14
67.68
59.22
50.76
42.30
33.84
25.38
16.92
8.46
0.00
8.46
16.92
25.38
33.84
42.30
50.76
59.22
67.68
76.14
84.60
93.06
126.90
328.06
319.60
311.14
302.68
294.22
285.76
277.30
268.84
260.38
251.92
243.46
235.00
243.46
251.92
260.38
268.84
277.30
285.76
294.22
302.68
311.14
319.60
328.06
361.90
286.82
Analysis No. -3
Analysis of Median with Kerb (Considering length 10.00m)
Sl. Item
Description of Work
Unit
No. No.
1 3.13/3 Excavation for Structures (Earth cum
04 work in excavation of foundation of
structures as per drawing and
technical specification, including
setting out, construction of shoring
and bracing, removal of stumps
and other deleterious matter,
dressing of sides and bottom,
backfilling the excavated earth to
the extent required and utilising
theremaining earth locally for road
work.)
(I) Ordinary soil.
A) Manual Means (Depth upto 3m)
(With dewatering).
Rate as per SOR 2009-10
13.5
(A)/
1500,
1700
&
2200
No.
2
Rate in
Rs.
116.00
Amount
in Rs.
290.00
10
0.4
0.15
1.20
10
0.225
0.15
0.68
Total
1.88
4750.00
8906.00
10
4.00
0.65
26.00
116.00
3016.00
10
0.41
8.20
95.00
779.00
10
0.41
8.20
43.00
353.00
149
Sl. Item
Description of Work
Unit
No. No.
6 17.57 Pre fabricated railing :Rm
Providing, fitting and erecting pre
febricated
railing
of
TATA
STRUCTURE materials having
size of 2.00 x 0.90 M in panels
made of 25x25x2.6/40x40x2.6
vertical
bars
and
40x40x2.6/32x32x2.6
horizontal
bars. The two end posts of each
panel are founded with M-15
cement concrete up to a depth of
200mm with anti corrosive primer
and paint etc. complete as per
drawing and approved technical
specification as directed.
Rate as per SOR 2009-10
No.
2
Rate in
Rs.
1099.00
Amount
in Rs.
21980.00
and
km
0.01
0.01
28474.00
285.00
km
0.01
0.01
114798.00
1148.00
Total =
36757.00
Cost per Rm = 3676.00
150
Statement No.- 5
Sl.
No.
MORT & Hs
specification
Item
No.
of
Cul.
Qty.from Sta
No.5A
1
2
3
13.6/(A) (i)
13.9/(B)
1/22/1.5 28m
St. 5B
Total
No.
of
Cul.
Qty.from Sta
No.5B
41
463.35
18997.22
41
15.44
41
107.92
1/22/1.5 46m
St. 5C
Total
No.
of
Cul.
Qty.from Sta
No.5C
492.24
492.24
633.22
16.37
4424.88
114.51
1/3 3/0
St. 5D
Total
No.
of
Cul.
Qty.from Sta
No.5D
Total
12
13
14
752.32
2256.95
17
693.99
11797.81
16.37
24.74
74.23
17
20.91
355.52
114.51
173.82
521.47
17
170.12
2892.02
Reinforcement
41
7.09
290.61
7.52
7.52
11.39
34.17
17
11.03
187.43
Backfilling
41
237.39
9732.96
252.23
252.23
385.76
1157.27
17
335.63
5705.74
14.7
Railing
41
19.20
787.20
19.20
19.20
19.20
57.60
17
21.68
368.56
14.10
41
0.00
0.00
0.00
0.00
0.00
0.00
17
27.30
464.10
14.19
41
0.00
0.00
0.00
0.00
0.00
0.00
17
52.00
884.00
14.11
41
0.00
0.00
0.00
0.00
0.00
0.00
17
54.60
928.20
10
14.5/B
41
0.00
0.00
0.00
0.00
0.00
0.00
17
21.14
359.35
41
69.85
2863.69
69.85
69.85
69.85
209.54
17
69.85
1187.38
Wing Wall
1
12.8B/ (A)
PCC M15
41
6.35
260.34
6.35
6.35
6.35
19.05
17
6.35
107.94
12.8B/ (B)
PCC M20
41
44.03
1805.23
44.03
44.03
44.03
132.09
17
99.80
1696.60
13.8
Weep Holes
41
32.00
1312.00
32.00
32.00
32.00
96.00
17
48.00
816.00
41
53.375
2188.38
53.375
53.38
53.375
160.13
17
53.38
907.38
41
27.10
1111.10
27.10
27.10
27.10
81.30
17
44.40
754.80
41
139.94
5737.55
139.94
139.94
139.94
419.82
17
148.49
2524.32
Curtain Wall
1
2
PCC M15
Apron
12.8B/(A)
PCC M15
41
11.4
467.40
11.4
11.40
11.4
34.20
17
34.20
581.40
15.9
41
3.4
139.40
3.4
3.40
3.4
10.20
17
11.40
193.80
15.11
Flexible Apron
41
47.2
1935.20
47.2
47.20
47.2
141.60
17
85.60
1455.20
82
83
Statement No.- 5
3/33/3
St. 5F
Total
No.
Qty.from
of
Sta No.5F
Cul.
1/5 3/0
St. 5G
Total
No.
Qty.from
of
Sta No.5G
Cul.
1/54/0
St. 5H
Total
No.
Qty.from
of
Sta No.5H
Cul.
1/6 3/0
St. 5I
Total
No.
Qty.from
of
Sta No.5I
Cul.
1/64/0
St. 5J
Total
Grand
Total
19
20
21
1165.01
4660.05
49853.98
153.15
30.87
123.49
1591.83
1894.38
423.64
1694.57
13482.45
Total
No.
of
Cul.
Qty.from Sta
No.5E
No.
Qty.from
of
Sta No.5J
Cul.
12
13
14
12
13
14
18
19
20
18
19
20
18
19
20
18
1173.38
2346.76
1460.54
1460.54
773.54
2320.63
1116.09
1116.09
881.14
4405.69
34.79
69.58
60.34
60.34
25.37
76.10
29.82
29.82
30.63
285.66
571.31
253.86
253.86
262.64
787.92
327.51
327.51
378.88
19.74
39.48
23.51
23.51
21.21
63.62
22.55
22.55
23.72
118.62
29.27
117.09
567.99
1135.98
475.35
475.35
347.69
1043.06
518.22
518.22
375.51
1877.55
547.80
2191.21
24089.59
904.61
21.68
43.36
21.40
21.40
26.28
78.84
26.48
26.48
28.88
144.40
29.00
116.00
1663.04
46.20
92.40
0.00
0.00
27.30
81.90
54.60
54.60
27.30
136.50
27.30
109.20
938.70
88.00
176.00
0.00
0.00
52.00
156.00
52.00
52.00
52.00
260.00
52.00
208.00
1736.00
92.40
184.80
0.00
0.00
54.60
163.80
54.60
54.60
54.60
273.00
54.60
218.40
1822.80
35.77
71.54
0.00
0.00
25.62
76.87
25.82
25.82
28.16
140.79
28.28
113.10
787.47
69.85
139.69
69.85
69.85
811.78
2435.34
811.78
811.78
811.78
4058.90
811.78
3247.12
15093.12
6.35
12.70
6.35
6.35
56.64
169.91
56.64
56.64
56.64
283.18
56.64
226.54
1148.99
99.80
199.60
99.18
99.18
108.79
326.37
196.32
196.32
121.04
605.20
214.14
856.56
5961.18
48.00
96.00
48.00
48.00
80.00
240.00
80.00
80.00
96.00
480.00
96.00
384.00
3584.00
53.38
106.75
53.38
53.38
53.38
160.13
53.38
53.38
53.38
266.88
53.38
213.50
4163.25
44.40
88.80
73.10
73.10
58.00
174.00
73.80
73.80
64.70
323.50
80.10
320.40
3027.90
148.49
296.98
148.49
148.49
165.59
496.76
165.59
165.59
174.14
870.68
174.14
696.54
11496.67
34.20
68.40
60.10
60.10
54.90
164.70
76.30
76.30
54.90
274.50
88.50
354.00
2092.40
11.40
22.80
20.00
20.00
15.00
45.00
25.40
25.40
18.30
91.50
29.50
118.00
669.50
85.60
171.20
127.60
127.60
101.20
303.60
128.80
128.80
112.50
562.50
139.50
558.00
5430.90
84
85
Statement No.- 5 A
Description
Nos.
Quantity
Excavation
Box Culvert
32.00
3.80
1.85
224.96
3.80
0.38
0.35
1.00
32.00
1.58
2.35
237.39
Total
2
unit
Cum
463.35
32.00
3.10
0.15
14.88
3.80
0.49
0.15
0.56
Total
Cum
15.44
3 RCC
Bottom Slab
32.00
3.00
0.38
Cum
36.48
Vertical Wall
32.00
0.300
2.00
Cum
38.4
Haunge
32.00
0.075
0.15
Cum
1.44
3.60
0.45
0.3
Cum
0.972
Top Slab
32.00
2.6
0.350
Cum
29.12
Wheel guard
9.60
0.35
0.225
Cum
1.512
32.00
0.375
0.3
Cum
Cum
107.92
Ton
7.088
2.35
Cum
237.39
Total
Cum
237.39
Rm
19.20
Backfilling behind
abutment,
32.00
1.58
Railing
9.60
3.50
32.00
0.15
Cum
0.00
3.50
32.00
0.30
Cum
0.00
9
10
0
0
2
32.00
32.00
9.60
Rm
Sqm
0.00
0.00
11
Excavation
wing wall ( high end)
4
4
4
0.73
1.85
0.26
4.62
2.25
2.05
Cum
Cum
Cum
22.11
27.44
3.50
8
Wearing Coat
Wing Wall
1.65
1.65
1.65
84
11
Item No.
Description
wing wall ( low end)
12
13
14
15
16
PCC M-15
18
1.24
2.05
4
4
0.73
1.85
4
4
unit
Cum
Quantity
4.62
2.25
1.65
Total
0.15
0.15
Cum
Cum
Cum
16.79
69.85
2.01
2.49
0.26
2.05
0.15
Cum
0.32
1.24
2.05
0.15
Cum
1.53
Total
Cum
6.35
Cum
No
44.03
32.00
Apron
E/w in Excavation
PCC M-15
PCC M-15
19
20
PCC M-20
PCC M-15
17
Nos.
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.3)
Cum
Cum
Cum
32.375
21.00
53.375
3.50
Cum
23.60
27.10
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
76.94
21
42
139.94
3.8
Cum
Cum
Cum
Cum
7.6
11.4
3.4
47.2
11.40
7.00
7.00
4.50
3.0
6.0
0.75
1.00
1.00
85
Statement No.- 5 B
Description
Nos.
Quantity
Excavation
Box Culvert
34.00
3.80
1.85
239.02
3.80
0.38
0.35
1.00
34.00
1.58
2.35
252.23
Total
2
unit
Cum
492.24
34.00
3.10
0.15
15.81
3.80
0.49
0.15
0.56
Total
Cum
16.37
3 RCC
Bottom Slab
34.00
3.00
0.38
Cum
38.76
Vertical Wall
34.00
0.300
2.00
Cum
40.8
Haunge
34.00
0.075
0.15
Cum
1.53
3.60
0.45
0.3
Cum
0.972
Top Slab
34.00
2.6
0.350
Cum
30.94
Wheel guard
9.60
0.35
0.225
Cum
1.512
34.00
0.375
0.3
Cum
Cum
114.51
Ton
7.518
2.35
Cum
252.23
Total
Cum
252.23
Rm
19.20
Backfilling behind
abutment,
34.00
1.58
Railing
9.60
3.50
34.00
0.15
Cum
0.00
3.50
34.00
0.30
Cum
0.00
9
10
0
0
2
34.00
34.00
9.60
Rm
Sqm
0.00
0.00
11
Excavation
wing wall ( high end)
4
4
4
0.73
1.85
0.26
4.62
2.25
2.05
Cum
Cum
Cum
22.11
27.44
3.50
8
Wearing Coat
Wing Wall
1.65
1.65
1.65
86
11
Item No.
Description
wing wall ( low end)
12
13
14
15
16
PCC M-15
18
1.24
2.05
4
4
0.73
1.85
4
4
unit
Cum
Quantity
4.62
2.25
1.65
Total
0.15
0.15
Cum
Cum
Cum
16.79
69.85
2.01
2.49
0.26
2.05
0.15
Cum
0.32
1.24
2.05
0.15
Cum
1.53
Total
Cum
6.35
Cum
No
44.03
32.00
Apron
E/w in Excavation
PCC M-15
PCC M-15
19
20
PCC M-20
PCC M-15
17
Nos.
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.3)
Cum
Cum
Cum
32.375
21.00
53.375
3.50
Cum
23.60
27.10
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
76.94
21
42
139.94
3.8
Cum
Cum
Cum
Cum
7.6
11.4
3.4
47.2
11.40
7.00
7.00
4.50
3.0
6.0
0.75
1.00
1.00
87
Statement No.- 5 C
Description
Nos.
Quantity
Excavation
Box Culvert
52.00
3.80
1.85
365.56
3.80
0.38
0.35
1.00
52.00
1.58
2.35
385.76
Total
2
unit
Cum
752.32
52.00
3.10
0.15
24.18
3.80
0.49
0.15
0.56
Total
Cum
24.74
3 RCC
Bottom Slab
52.00
3.00
0.38
Cum
59.28
Vertical Wall
52.00
0.300
2.00
Cum
62.4
Haunge
52.00
0.075
0.15
Cum
2.34
3.60
0.45
0.3
Cum
0.972
Top Slab
52.00
2.6
0.350
Cum
47.32
Wheel guard
9.60
0.35
0.225
Cum
1.512
52.00
0.375
0.3
Cum
Cum
173.82
Ton
11.391
2.35
Cum
385.76
Total
Cum
385.76
Rm
19.20
Backfilling behind
abutment,
Railing
9.60
3.50
52.00
0.15
Cum
0.00
3.50
52.00
0.30
Cum
0.00
9
10
0
0
2
52.00
52.00
9.60
Rm
Sqm
0.00
0.00
11
Excavation
wing wall ( high end)
4
4
4
0.73
1.85
0.26
4.62
2.25
2.05
Cum
Cum
Cum
22.11
27.44
3.50
52.00
1.58
8
Wearing Coat
Wing Wall
1.65
1.65
1.65
88
11
Item No.
Description
wing wall ( low end)
12
13
14
15
16
PCC M-15
18
PCC M-15
Apron
E/w in Excavation
PCC M-15
PCC M-15
19
20
1.24
2.05
4
4
0.73
1.85
4.62
2.25
4
4
0.26
1.24
2.05
2.05
PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.4)
4
8
Providing weep holes
Curtain Wall
E/W in Excavation
1
7.00
D/S
1
7.00
U/S
PCC M-15
17
Nos.
1.65
Total
0.15
0.15
0.15
0.15
Total
unit
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
No
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.3)
Cum
Cum
Cum
Quantity
16.79
69.85
2.01
2.49
0.32
1.53
6.35
44.03
32.00
32.375
21.00
53.375
3.50
Cum
23.60
27.10
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
76.94
21
42
139.94
3.8
Cum
Cum
Cum
Cum
7.6
11.4
3.4
47.2
11.40
7.00
7.00
4.50
3.0
6.0
0.75
1.00
1.00
89
Statement No.- 5 D
Item No.
1
Description
Length(m)
1
2
2
26.00
5.84
26.00
Breadth(m) Height(m)
unit
Quantity
Cum
Cum
356.82
1.53
335.63
693.99
20.05
0.87
20.91
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm
52.416
65.52
1.17
1.5228
41.9328
1.7073
5.85
170.12
11.025
335.63
335.63
21.68
27.30
54.60
52.00
21.14
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
22.11
27.44
3.50
16.79
69.85
2.01
2.49
0.32
1.53
6.35
Cum
99.80
Excavation
Box Culvert
Excavation for back filling
Nos.
3 RCC
Bottom Slab
Vertical Wall
Haunge
Top Slab
Wheel guard
Approach slab chair
1
2
1
2
4
2
1
2
2
4.80
0.420
0.075
0.45
3.84
0.35
0.375
0.42
3.00
0.15
0.3
0.420
0.225
0.3
26.00
1.89
3.42
Total
2
2
2
1
1
10.84
3.50
3.50
2
26.00
26.00
26.00
26.00
10.84
0.15
0.30
4
4
4
4
0.73
1.85
0.26
1.24
4.62
2.25
2.05
2.05
1.65
1.65
1.65
1.65
Total
0.15
0.15
0.15
0.15
Total
6
7
8
Railing
PCC M15 Below app.
Slab
RCC Approach Slab
9
10
11 Excavation
wing wall ( high end)
5.14
0.49
2.35
0.35
3.42
Total
0.15
0.15
Total
26.00
26.00
26.00
5.64
26.00
10.84
26.00
4
5
Wearing Coat
Wing Wall
26.00
5.84
5.84
0.38
1.89
4
4
4
4
0.73
1.85
0.26
1.24
13 PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)
4.62
2.25
2.05
2.05
0.08
90
Item No.
14
Description
Providing weep holes
Nos.
4
unit
No
Quantity
48.00
91
Item No.
Description
Nos.
Curtain Wall
15 E/W in Excavation
D/S
U/S
16 PCC M-15
PCC M-15
Apron
17 E/w in Excavation
18 PCC M-15
PCC M-15
19
20
Length(m)
1
1
7.00
7.00
Breadth(m) Height(m)
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)
unit
Cum
Cum
Cum
Quantity
32.375
21.00
53.375
5.80
Cum
38.60
44.40
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
85.49
21
42
148.49
11.4
Cum
Cum
Cum
Cum
22.8
34.2
11.4
85.6
11.40
7.00
7.00
5.00
3.0
6.0
0.75
1.00
1.00
92
Statement No.- 5 E
Item No.
1
Description
Length(m)
1
2
2
44.00
5.84
44.00
Breadth(m) Height(m)
unit
Quantity
Cum
Cum
603.86
1.53
567.99
1173.38
33.92
0.87
34.79
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm
88.704
110.88
1.98
1.5228
70.9632
1.7073
9.9
285.66
19.739
567.99
567.99
21.68
46.20
92.40
88.00
35.77
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
22.11
27.44
3.50
16.79
69.85
2.01
2.49
0.32
1.53
6.35
Cum
99.80
Excavation
Box Culvert
Excavation for back filling
Nos.
3 RCC
Bottom Slab
Vertical Wall
Haunge
Top Slab
Wheel guard
Approach slab chair
1
2
1
2
4
2
1
2
2
4.80
0.420
0.075
0.45
3.84
0.35
0.375
0.42
3.00
0.15
0.3
0.420
0.225
0.3
44.00
1.89
3.42
Total
2
2
2
1
1
10.84
3.50
3.50
2
44.00
44.00
44.00
44.00
10.84
0.15
0.30
4
4
4
4
0.73
1.85
0.26
1.24
4.62
2.25
2.05
2.05
1.65
1.65
1.65
1.65
Total
0.15
0.15
0.15
0.15
Total
6
7
8
Railing
PCC M15 Below app.
Slab
RCC Approach Slab
9
10
11 Excavation
wing wall ( high end)
5.14
0.49
2.35
0.35
3.42
Total
0.15
0.15
Total
44.00
44.00
44.00
5.64
44.00
10.84
44.00
4
5
Wearing Coat
Wing Wall
44.00
5.84
5.84
0.38
1.89
4
4
4
4
0.73
1.85
0.26
1.24
13 PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)
4.62
2.25
2.05
2.05
0.08
92
Item No.
14
Description
Providing weep holes
Nos.
4
unit
No
Quantity
48.00
93
Item No.
Description
Nos.
Curtain Wall
15 E/W in Excavation
D/S
U/S
16 PCC M-15
PCC M-15
Apron
17 E/w in Excavation
18 PCC M-15
PCC M-15
19
20
Length(m)
1
1
7.00
7.00
Breadth(m) Height(m)
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)
unit
Cum
Cum
Cum
Quantity
32.375
21.00
53.375
5.80
Cum
38.60
44.40
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
85.49
21
42
148.49
11.4
Cum
Cum
Cum
Cum
22.8
34.2
11.4
85.6
11.40
7.00
7.00
5.00
3.0
6.0
0.75
1.00
1.00
94
Statement No.- 7 F
No.of cell
Description
RCC
Bottom Slab
Vertical Wall
Vertical Wall MID
Haunge
APP SLAB CHAIR
BOTTOM SLAB CUT OFF
Top Slab
Wheel guard
Approach slab chair
1
2
2
1
2
1
2
2
12
2
2
1
2
0
1.87
3.35
Total
2
0
0
0
0
10.70
3.50
3.50
2
38.00
38.00
38.00
38.00
10.70
0.15
0.30
4
4
4
4
0.73
1.85
0.26
1.24
4.62
2.25
2.05
2.05
4
4
4
0.73
1.85
0.26
4.62
2.25
2.05
Railing
PCC M15 Below app.
Slab
RCC Approach Slab
Wearing Coat
Wing Wall
11
Excavation
wing wall ( high end)
PCC M-15
10.30
0.49
2.35
0.35
3.35
Total
0.15
0.15
Total
38.00
38.00
11.00
11.00
0.38
1.87
3.60
0.350
0.250
0.075
0.45
0.55
3.7
0.35
0.375
10
38.00
11.00
38.00
38.00
38.00
38.00
38.00
10.20
10.8
38.00
10.70
38.00
4
5
7
8
9
Breadth(m) Height(m)
unit
Quantity
Cum
982.30
2.89
475.35
1460.54
58.71
1.63
60.34
Excavation
Box Culvert
3.000 Nos
Nos.
Length(m)
0.4
3.00
3.00
0.15
0.3
Cum
0.075
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm
54.72
79.80
57.00
5.13
2.75
3.56
49.21
1.69
0
253.86
23.513
475.35
475.35
21.40
0.00
0.00
0.00
0.00
1.65
1.65
1.65
1.65
Total
0.15
0.15
0.15
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
22.11
27.44
3.50
16.79
69.85
2.01
2.49
0.32
0.3
0.350
0.225
0.3
Cum
Cum
94
Item No.
Description
Nos.
Length(m)
1.24
Breadth(m) Height(m)
2.05
0.15
Total
unit
Quantity
Cum
Cum
1.53
6.35
95
Item No.
13
Description
Nos.
Length(m)
14
PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.5)
4
12
Providing weep holes
15
Curtain Wall
E/W in Excavation
D/S
U/S
16
PCC M-15
PCC M-15
17
Apron
E/w in Excavation
18
PCC M-15
PCC M-15
19
20
1
1
7.00
7.00
Breadth(m) Height(m)
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.3)
unit
Quantity
Cum
No
99.18
48.00
Cum
Cum
Cum
32.375
21.00
53.375
9.50
Cum
63.60
73.10
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
85.49
21
42
148.49
20
Cum
Cum
Cum
Cum
40.1
60.1
20
127.6
11.40
7.00
7.00
5.00
3.0
6.0
0.75
1.00
1.00
96
Statement No.- 5 G
Quantity Calculation of R.C.C.Box Cell 5.00m x 3.00m
Estimate of Quantity for 5.00m x 3.00 m (without earth cushion) single cell box culvert
Span of Culvert =
5.00 m
Height of Culvert =
3.00 m
Base Slab
0.57 m
Top Slab
0.500 m
Vertical wall
0.570 m
Projection of base
0.300 m
Length of Box =
26.00 m
Item No.
1
Description
unit
Quantity
Cum
Cum
424.03
1.82
347.69
773.54
24.34
1.03
25.37
82.992
88.92
1.17
1.8198
79.82
2.06955
5.85
262.64
21.206
347.69
347.69
26.28
27.30
54.60
52.00
25.62
Excavation
Box Culvert
Excavation for back filling
Nos.
3 RCC
Bottom Slab
Vertical Wall
Haunge
1
2
2
1
2
26.00
6.94
26.00
26.00
6.94
6.94
0.38
1.91
6.24
0.49
2.35
0.35
3.50
Total
0.15
0.15
Total
1
2
4
2
1
2
2
26.00
26.00
26.00
6.74
26.00
13.14
26.00
5.60
0.570
0.075
0.45
6.14
0.35
0.375
0.57
3.00
0.15
0.3
0.500
0.225
0.3
4
5
26.00
1.91
3.50
Total
6
7
8
Railing
PCC M15 Below app. Slab
RCC Approach Slab
13.14
3.50
3.50
2
26.00
26.00
26.00
26.00
13.14
0.15
0.30
9
10
2
2
2
1
1
0.08
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm
11
Excavation
wing wall ( high end)
4
4
4
4
4.54
6.520
0.26
1.24
13.59
4.54
2.05
2.05
4
4
4
4
4.54
6.52
0.26
1.24
13.59
4.54
2.05
2.05
2.15
2.15
2.15
2.15
Total
0.15
0.15
0.15
0.15
Total
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
530.63
254.71
4.57
21.88
811.78
37.02
17.77
0.32
1.53
56.64
Cum
108.79
Top Slab
Wheel guard
Approach slab chair
Wearing Coat
Wing Wall
PCC M-15
13
PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)
96
Item No.
Description
14
Providing weep holes
Nos.
4
unit
No
Quantity
80.00
97
Item No.
15
Description
Nos.
Curtain Wall
E/W in Excavation
D/S
U/S
16
PCC M-15
PCC M-15
17
18
Apron
E/w in Excavation
PCC M-15
PCC M-15
19
20
1
1
7.00
7.00
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)
unit
Cum
Cum
Cum
Quantity
32.375
21.00
53.375
7.50
Cum
50.50
58.00
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
102.59
21
42
165.59
18.3
Cum
Cum
Cum
Cum
36.6
54.9
15
101.2
11.40
7.00
7.00
6.00
3.0
6.0
0.75
1.00
1.00
98
Statement No.- 5 H
Quantity Calculation of R.C.C.Box Cell 5.00m x 4.00m
Estimate of Quantity for 5.00m x 4.00 m (without earth cushion) single cell box culvert
Span of Culvert =
5.00 m
Height of Culvert =
4.00 m
Base Slab
0.6 m
Top Slab
0.520 m
Vertical wall
0.620 m
Projection of base
0.800 m
Length of Box =
26.00 m
Item No.
1
Description
unit
Quantity
Cum
Cum
595.76
2.11
518.22
1116.09
28.63
1.19
29.82
102.96
128.96
1.17
2.1168
84.3648
2.0853
5.85
327.51
22.550
518.22
518.22
26.48
27.30
54.60
52.00
25.82
Excavation
Box Culvert
Excavation for back filling
Nos.
3 RCC
Bottom Slab
Vertical Wall
Haunge
1
2
2
1
2
26.00
8.04
26.00
26.00
8.04
8.04
0.38
2.20
7.34
0.49
2.85
0.35
4.52
Total
0.15
0.15
Total
1
2
4
2
1
2
2
26.00
26.00
26.00
7.84
26.00
13.24
26.00
6.60
0.620
0.075
0.45
6.24
0.35
0.375
0.6
4.00
0.15
0.3
0.520
0.225
0.3
4
5
26.00
2.20
4.52
Total
6
7
8
Railing
PCC M15 Below app. Slab
RCC Approach Slab
13.24
3.50
3.50
2
26.00
26.00
26.00
26.00
13.24
0.15
0.30
9
10
2
2
2
1
1
0.08
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm
11
Excavation
wing wall ( high end)
4
4
4
4
4.54
6.520
0.26
1.24
13.59
4.54
2.05
2.05
4
4
4
4
4.54
6.52
0.26
1.24
13.59
4.54
2.05
2.05
2.15
2.15
2.15
2.15
Total
0.15
0.15
0.15
0.15
Total
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
530.63
254.71
4.57
21.88
811.78
37.02
17.77
0.32
1.53
56.64
Cum
196.32
Top Slab
Wheel guard
Approach slab chair
Wearing Coat
Wing Wall
PCC M-15
13
PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)
98
Item No.
Description
14
Providing weep holes
Nos.
4
unit
No
Quantity
80.00
99
Item No.
15
Description
Nos.
Curtain Wall
E/W in Excavation
D/S
U/S
16
PCC M-15
PCC M-15
17
18
Apron
E/w in Excavation
PCC M-15
PCC M-15
19
20
1
1
7.00
7.00
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)
unit
Cum
Cum
Cum
Quantity
32.375
21.00
53.375
9.60
Cum
64.20
73.80
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
102.59
21
42
165.59
25.4
Cum
Cum
Cum
Cum
50.9
76.3
25.4
128.8
11.40
7.00
7.00
6.00
3.0
6.0
0.75
1.00
1.00
100
Statement No.- 5 I
Quantity Calculation of R.C.C.Box Cell 6.00m x 3.00m
Estimate of Quantity for 6.00m x 3.00 m (without earth cushion) single cell box culvert
Span of Culvert =
6.00 m
Height of Culvert =
3.00 m
Base Slab
0.72 m
Top Slab
0.680 m
Vertical wall
0.720 m
Projection of base
0.300 m
Length of Box =
26.00 m
Item No.
1
Description
unit
Quantity
Cum
Cum
503.46
2.16
375.51
881.14
29.41
1.22
30.63
123.552
112.32
1.17
2.1708
131.5392
2.2743
5.85
378.88
23.724
375.51
375.51
28.88
27.30
54.60
52.00
28.16
Excavation
Box Culvert
Excavation for back filling
Nos.
3 RCC
Bottom Slab
Vertical Wall
Haunge
Below Bottom Slab
Top Slab
Wheel guard
Approach slab chair
1
2
2
1
2
26.00
8.24
26.00
26.00
8.24
8.24
0.38
1.96
7.54
0.49
2.35
0.35
3.68
Total
0.15
0.15
Total
1
2
4
2
1
2
2
26.00
26.00
26.00
8.04
26.00
14.44
26.00
6.60
0.720
0.075
0.45
7.44
0.35
0.375
0.72
3.00
0.15
0.3
0.680
0.225
0.3
4
5
26.00
1.96
3.68
Total
6
7
8
Railing
PCC M15 Below app. Slab
RCC Approach Slab
14.44
3.50
3.50
2
26.00
26.00
26.00
26.00
14.44
0.15
0.30
9
10
2
2
2
1
1
0.08
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm
11
Excavation
wing wall ( high end)
4
4
4
4
4.54
6.520
0.26
1.24
13.59
4.54
2.05
2.05
4
4
4
4
4.54
6.52
0.26
1.24
13.59
4.54
2.05
2.05
2.15
2.15
2.15
2.15
Total
0.15
0.15
0.15
0.15
Total
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
530.63
254.71
4.57
21.88
811.78
37.02
17.77
0.32
1.53
56.64
Cum
121.04
Wearing Coat
Wing Wall
PCC M-15
13
PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)
100
Item No.
Description
14
Providing weep holes
Nos.
unit
No
Quantity
96.00
101
Item No.
15
Description
Nos.
PCC M-15
PCC M-15
17
18
Apron
E/w in Excavation
PCC M-15
PCC M-15
19
20
unit
Quantity
Curtain Wall
E/W in Excavation
D/S
U/S
16
1
1
7.00
7.00
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
32.375
21.00
53.375
8.40
Cum
56.30
64.70
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
111.14
21
42
174.14
18.3
Cum
Cum
Cum
Cum
36.6
54.9
18.3
112.5
11.40
7.00
7.00
6.50
3.0
6.0
0.75
1.00
1.00
102
Statement No.- 5 J
Quantity Calculation of R.C.C.Box Cell 6.00m x 4.00m
Estimate of Quantity for 6.00m x 4.00 m (without earth cushion) single cell box culvert
Span of Culvert =
6.00 m
Height of Culvert =
4.00 m
Base Slab
0.72 m
Top Slab
0.680 m
Vertical wall
0.750 m
Projection of base
0.300 m
Length of Box =
26.00 m
Item No.
1
Description
unit
Quantity
Cum
Cum
615.03
2.18
547.80
1165.01
29.64
1.23
30.87
123.552
156
1.17
2.187
132.6
2.28375
5.85
423.64
29.273
547.80
547.80
29.00
27.30
54.60
52.00
28.28
Excavation
Box Culvert
Excavation for back filling
Nos.
3 RCC
Bottom Slab
Vertical Wall
Haunge
Below Bottom Slab
Top Slab
Wheel guard
Approach slab chair
1
2
2
1
2
26.00
8.30
26.00
26.00
8.30
8.30
0.38
2.25
7.60
0.49
2.85
0.35
4.68
Total
0.15
0.15
Total
1
2
4
2
1
2
2
26.00
26.00
26.00
8.10
26.00
14.50
26.00
6.60
0.750
0.075
0.45
7.5
0.35
0.375
0.72
4.00
0.15
0.3
0.680
0.225
0.3
4
5
26.00
2.25
4.68
Total
6
7
8
Railing
PCC M15 Below app. Slab
RCC Approach Slab
14.50
3.50
3.50
2
26.00
26.00
26.00
26.00
14.50
0.15
0.30
9
10
2
2
2
1
1
0.08
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Ton
Cum
Cum
Rm
Cum
Cum
Rm
Sqm
11
Excavation
wing wall ( high end)
4
4
4
4
4.54
6.520
0.26
1.24
13.59
4.54
2.05
2.05
4
4
4
4
4.54
6.52
0.26
1.24
13.59
4.54
2.05
2.05
2.15
2.15
2.15
2.15
Total
0.15
0.15
0.15
0.15
Total
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Cum
530.63
254.71
4.57
21.88
811.78
37.02
17.77
0.32
1.53
56.64
Cum
214.14
Wearing Coat
Wing Wall
PCC M-15
13
PCC M-20
Qty as per MOST DWG No SD/113 ( Sheet No.6)
102
Item No.
Description
14
Providing weep holes
Nos.
4
unit
No
Quantity
96.00
103
Item No.
15
Description
Nos.
Curtain Wall
E/W in Excavation
D/S
U/S
16
PCC M-15
PCC M-15
17
18
Apron
E/w in Excavation
PCC M-15
PCC M-15
19
20
1
1
7.00
7.00
1.85
1.5
2.5
2.0
Total
Qty as per MOST DWG No SD/111 ( Sheet No.4)
unit
Cum
Cum
Cum
Quantity
32.375
21.00
53.375
10.40
Cum
69.70
80.10
Total
Qty as per DWG No SD/111 ( Sheet No.4)
Cum
Cum
Cum
Cum
Cum
111.14
21
42
174.14
29.5
Cum
Cum
Cum
Cum
59
88.5
29.5
139.5
11.40
7.00
7.00
6.50
3.0
6.0
0.75
1.00
1.00
104
Statement No -10
Quantity for drain cum footpath
Sl.No.
1
From
Ch
2
To
Ch.
3
Side
4
Unit
Length
in M
5
226700
227455
R.H.S.
RM
755.00
226700
227455
L.H.S.
RM
755.00
228100
229321
R.H.S.
RM
1221.00
228100
229321
L.H.S.
RM
1221.00
246200
247100
R.H.S.
RM
900.00
246200
247100
L.H.S.
RM
900.00
248200
249145
R.H.S.
RM
945.00
248200
249145
L.H.S.
RM
945.00
262677
263469
R.H.S.
RM
792.00
10
262677
263569
L.H.S.
RM
892.00
11
263682
264850
L.H.S.
RM
1168.00
12
263800
264850
R.H.S.
RM
1050.00
Total =
11544.00
130
Appendix C.26 e : Single Cell RCC Box Culvert of size 3 x 2 (U/S & D/S Pitching)
Sl.N
Descriptions
o.
1 Excavation
Box Portion
L=3.0+2x0.42+2x0.90+2x0.10 = 5.84 m
Width = 12 m
Depth = 1.0 m from natural ground level
For Key portion
L=3.0+2x0.42+2x0.90+2x0.10 = 5.84 m
Area = (0.30x0.63)+(0.50x0.63x0.63) = 0.388
No. = 2
Wing wall
Length of wing wall = 3.82 m
Depth of Foundation = 1.50 m
Width = (2.25+ 3.2)/2 = 2.73 m
(Refer MOST Dwq. No. SD/113 sheet 6 of 6)
No. = 4
For Return wall
Length of Return wall = 1.4 + 0.1 = 1.5m
Width = 2.05 m
Depth = 1.50 m
No. = 4
Total
2
cum
cum
5.84
12.00
1.00
5.84
0.39
cum
3.82
2.73
1.50
cum
1.50
2.05
1.50
5.84
12.00
0.15
sqm
cum
cum
3.82
2.73
0.15
cum
1.50
2.05
0.15
1.40
cum
cum
cum
1.75
10
11
12
13
14
15
16
Total
Approach slab
I. Levelling course M-15 concrete
L= 3.50 m
W = 12m
Thick = 0.15m
No. = 4
II. RCC M-30 grade concrete
L= 3.50 m
W = 12m
Thick = 0.3m
No. = 4
RCC M 40 Crash Barriers
No. = 2
L = 3+2x0.42+2x3.5 = 10.84 m
Filling with Filter media (Both side)
a) For Box Portion
No. =2
L= 0.6m
W = 12m
Ht. = 1.4m
b) For wing wall
Length of wing wall = 3.82 m
Ave.Ht. = (3.55+2.15)/2 = 2.85 m
Width = 0.60 m
No. = 4
Total
Stone pitching for Floor Apron
a) 150 mm thick PCC M-15
b) 300 mm thick concrete
c) 150 mm thick Flat Stone
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
Stone pitching for Flexible Apron
750 mm thick Stone
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
Curtain Wall
a) PCC under curtain wall
c) Concrete for D/S curtain wall
d) Concrete for U/S curtain wall
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
Tar Paper Bearing
Backfilling behind Abutment, wing wall etc.
a) Behind Abutment
b) Behind Wing wall
Total
Expansion joint
Drainage Spout
Weap holes
Reinforcement (As per MOST)
a) For Box Portion
cum
3.50
12.00
0.15
cum
3.50
12.00
0.30
Lm
10.84
cum
0.60
12.00
1.40
cum
3.82
0.60
2.85
sqm
12.00
0.30
cum
cum
2
4
12.00
3.82
3.50
3.50
Mtr.
No.
No.
12.00
cum
cum
cum
cum
cum
cum
cum
1.70
1.50
MT
4.532
62.572
18.450
155.633
10.512
6.257
1.845
18.614
83.920
47.100
9.800
56.900
12.600
25.200
21.680
20.160
26.129
46.289
11.400
22.800
11.400
45.600
85.600
6.400
24.100
18.600
7.200
142.800
80.220
223.020
24.000
2.000
95.000
5.700
ve Engineer, PWD
H Division, Nagaon
Appendix C.26 h : Single Cell RCC Box Culvert of size 3 x 4 (U/S & D/S Pitching)
Sl.
No
Descriptions
.
1 Excavation
Box Portion
L=3.0+2x0.48+2x1.7+2x0.10 = 7.56 m
Width = 12 m
Depth = 1.0 m from natural ground level
For Key portion
L=3.0+2x0.48+2x1.7+2x0.10 = 7.56 m
Area = (0.30x0.63)+(0.50x0.63x0.63) = 0.388
No. = 2
Wing wall
Length of wing wall = 9.76 m
Depth of Foundation = 1.50 m
Width = (5.44+ 7.68)/2 = 6.56 m
(Refer MOST Dwq. No. SD/113 sheet 6 of 6)
No. = 4
For Return wall
Length of Return wall = 1.4 + 0.1 = 1.5m
Width = 2.05 m
Depth = 1.50 m
No. = 4
Total
cum
7.56
12.00
1.00
7.56
0.39
cum
9.76
6.56
1.50
cum
1.50
2.05
1.50
7.56
12.00
0.15
sqm
cum
cum
9.76
6.56
0.15
cum
1.50
2.05
0.15
1.40
cum
cum
cum
1.75
Total
5 Approach slab
I. Levelling course M-15 concrete
L= 3.50 m
W = 12m
Thick = 0.15m
No. = 4
II. RCC M-30 grade concrete
L= 3.50 m
W = 12m
Thick = 0.3m
No. = 4
6 Crash Barrier
No. = 2
L = 3+2x0.48+2x3.5 = 10.96 m
7 Filling with Filter media (Both side)
a) For Box Portion
No. =2
L= 0.6m
W = 12m
Ht. = 2.4m
b) For wing wall
Length of wing wall = 9.76 m
Ave.Ht. = (5.65+2.15)/2 = 3.90 m
Width = 0.60 m
No. = 4
Total
8 Stone pitching for Floor Apron
a) 150 mm thick PCC M-15
b) 300 mm thick concrete
c) 150 mm thick Flat Stone
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
9 Stone pitching for Flexible Apron
750 mm thick Stone
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
10 Curtain Wall
a) PCC under curtain wall
c) Concrete for D/S curtain wall
d) Concrete for U/S curtain wall
(Refer MOST Dwg. No. SD/111 sheet 4 of 4)
11 Tar Paper Bearing
12 Backfilling behind Abutment, wing wall etc.
a) Behind Abutment
b) Behind Wing wall
Total
13 Expansion joint
14 Drainage Spout
15 Weap holes 150 mm dia.
16 Reinforcement (As per MOST)
a) For Box Portion
cum
3.50
12.00
0.15
cum
3.50
12.00
0.30
Lm
10.96
cum
0.60
12.00
2.40
cum
9.76
0.60
3.90
sqm
12.00
0.30
cum
cum
2
4
12.00
9.76
3.50
3.50
Mtr.
No.
No.
12.00
cum
cum
cum
cum
cum
cum
cum
3.40
3.50
MT
5.867
384.154
18.450
499.190
13.608
38.415
1.845
53.868
124.000
188.770
9.800
198.570
12.600
25.200
21.920
34.560
91.354
125.914
20.500
41.000
20.500
82.000
113.400
8.400
31.900
24.700
7.200
285.600
478.240
763.840
24.000
2.000
120.000
7.540
ve Engineer, PWD
H Division, Nagaon