Step-1
1.
2.
3.
Button.
Step-2
To Create New Item Category ,Enter following data
Manual item category (if business demands,we can add manual item
category to override default item category).
Note : Default item category will be picked up automatically for sales
document type in which it's define. Manual Item Category can be used in place
of default item category OR we can replace default item category in sales
document with allowed manual item category. e.g. Default item category( YTA2)
can be replaced with Manual item category (TAP,TAQ,TANN).
Step-3
Click on Save
Button.
Item Category
Purpose
This wiki page will breify discuss about functionality of Item Category in SAP Sales and Distribution transaction.
Introduction
Item category is critical and esstential part of sales order and sales process. It generally controls the behaviour of item in a
sales order, like, pricing, TOR, etc.
Completion Rule
Order Quantity
=1
Determine Cost
Credit active
Pricing
Item Category
Description
BVN
Cash Sale
TAB
G2N
Credit memo
TAK
Make to order
KBN
Consignment fill up
KRN
Consignment return
TAQ
TAS
Third party
REN
Returns
L2N
Debit memo
Features
Item Category
Description
TAC
Configurable material
KEN
Consignment issue
KAN
Consignment Pickup
TAP
TAE
Explanation - BOM
TAW
Value Item
AGN
Standard item in QT
Features
TAN
for billing
TANN
TATX
Item Category
Description
Features
pricing,
taxes & weight calculations
Items that are not relevant for del, such as
credit
memo requests, do not have schedule lines.
Usually, items that do not have schedule
lines cannot
be copied in to a delivery. Text items are an
exception.
You do not need pricing or del quantities &
dates (i.e.
schedule lines) for a text item (item cat: TATX), in
the
standard order.
SPRO Path
IMG - Sales and Distribution - Sales - Sales Document - Sales Document Item - Assign Item Category
Transaction Code
VOV4
Determination Rule
Item Category
Example
+ Usage
OR
NORM
OR
NORM
OR
NORM
Usage
TAN
TANN
TAN
FREE
TAN
TANN
Billing plan
A billing plan is a schedule of individual billing dates for a single item in a sales document. You can
define a billing plan at header level, which is then valid for all items assigned to it.
Depending on the kind of business process you are carrying out, the system can automatically
propose one of two different types of billing plan: periodic billing or milestone billing.
Periodic billing means billing a total amount for each individual billing date in the plan. For example,
if you are creating a rental contract, the system can propose a schedule of monthly rental payments,
according to the length and conditions of the contract.
Milestone billing means distributing the total amount to be billed over multiple billing dates in the
billing plan. For example, you can use a billing plan for billing a make-to-order item that is assigned
to a project in the SAP Project System. When you enter the project-related make-to-order item in the
sales order (or assembly order), the system proposes a billing plan based on milestones defined for
networks in the project. As each milestone is successfully reached, the customer is billed either a
percentage of the entire project cost or simply a pre-defined amount.
For more information on this, go thru this link
[Billing Plan|http://help.sap.com/printdocu/core/Print46c/en/data/pdf/SDBIL/SDBIL2.pdf]
For example, for milestone billing, you must be able to enter data to identify the
individual milestones.
IMG configuration requires :1. Maintain billing plan types for milestone billing in OVBO.
2. Define date description in SM30 - V_TVTB.
3. Maintain Date Category for Billing Plan Type IN OVBJ.
4. Allocate date category in SM30 - V_TFPLA_TY.
5. Maintain date proposal for Billing Plan Type in OVBM.
6. Assign Billing Plan Type to Sales Documents Type in OVBP.
7. Assign Billing Plan Type to Item Categories in OVBR.
8. Define rules for determining the date in OVBS.
Milestone billing is typically used for billing projects, such as plant engineering and
construction projects. Such projects often include a series of milestones that mark the
completion of different stages of the work. In the SAP R/3 System, milestones are defined
in a network along with planned and actual dates for the completion of work. The milestones
are also assigned to the billing dates in the billing plan.
Each milestone-related billing date is blocked for processing until the Project System
confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the
basis of the requested delivery quantity and not on the total of the confirmed quantities.
The connection between the project and the sales document item is made in the individual
schedule lines of the item. Each schedule item can be assigned to a network in a project.
To display the project-related data for a schedule line, proceed as follows:
In one of the overview screens of the sales document, select
1. Item -> Schedule lines.
2. Mark the schedule line and select Procurement details.
The following figure shows an example of milestone billing where only the Contract have
been billed :
Order Item Turbine 100,000
Billing Plan
Billing date Description % Value Billing Block Milestone Billing Status
01-10-94 Contract 10 10,000 - x x
01-03-95 Assembly 30 30,000 x x
01-04-95 Maintenance 30 30,000 x x
01-05-95 Acceptance 30 30,000 x x
01-06-95 Final invoice .. .. x
Network/Activities
Milestone Estimate Actual
Assembly 01-03-95 01-03-95
Maintenance 01-04-95
Acceptance 01-05-95
For each billing date in a milestone billing plan, you can specify whether the billing
date is:
1. fixed
2. always updated with the actual date of the milestone
3. updated with the actual date of the milestone, if the date is earlier than the
planned billing date for the date
During your project you may need to implement SAP SD billing plan functionality .I am publishing part I of
SAP Billing plan documentation .This part of documentation mostly covers Periodic billing plan used in SAP
SD.I will cover Milestone billing plan in my part II section of documentation .
Billing plan
In SAP SD a billing plan is a schedule of individual billing dates for a single item in a sales document. You can
define a billing plan at header level, which is then valid for all items assigned to it.Depending on the kind of
business process you are carrying out, the system can automatically propose the billing plan.
Types of billing plan
SAP SD has two billing plans
a. Periodic billing Plan
b. Milestone billing Plan
When To Use Periodic billing plan :-
Periodic billing plans are used for service products such as rentals or maintenance mostly. You should have a
service product with a time-dependent price (i.e. calculation type M, N, O or P) which need to be billed
regularly, e.g. monthly, quarterly, etc.Client can raise the rental or maintenance/service invoices based on
monthly , quarterly ,yearly etc. basis to their customers.
NOTE:- The sum of every line item added to the Net the value of the contract .
Example One service contract being billed on monthly basis .
Start date -27.08.2015
End Date 26.10.2015
Settlement From Settlement To Billing date
Billing Value
27.08.2015
26.09.2015
27.08.2015
100 MYR
27.09.2015
26.10.2015
27.09.2015
100 MYR
From the above example value of the contract will be 200 MYR.
When To Use Milestone billing plan :Milestone billing is used for sales products in big projects when the product is paid in various
installments.Milestone billing plans are used in sales quotations and sales orders or Items in service orders
.You have a sales product with a known net value.
NOTE:- You distribute the net value over several milestones.
Example- One sales order created having value 200 MYR.
Value of 200 MYR will be distributed among various dates( % or amount ) as per the configuration.
Billing Date
Description
Billing Value
27.08.2015
Phase -I Completion
50 MYR
27.09.2015
100 MYR
27.11.2015
50 MYR
From the above example value of the sales order will be 200 MYR.
Configuration steps for Periodic billing plan
A. Start date :- Date from which billing plan will start .Start date is compared with next billing date(5) and
gives first date of Settlement To and Billing date in periodic plan. ie. If your start date is the 24rd of a
month and you are billing monthly, all billing date will start on the 23rd (if there are no further conditions
discussed in the later part of the document ).
B. End Date :- Date on which billing plan ends .
Screen shot from rental contract header.
C.Horizon :- This is optional field .If there is no End date entered or Contract end date is far in the future . Not
all billing dates can be accomodated in the billing date screen.The horizon calculates the last billing date in the
billing plan, based on the current date plus a specified time period.
ExampleIf the rental /service contract which is valid from 24.08.2015 until 23.12.2098 .
Before : Rental contract with no Horizon
Screen 1 End date far in future
Screen 2 No Horizon period
Screen 3 Billing dates created up to 2098 .
Note : Schedule a back ground job for RVFPLAN01(T-code V.07) to create the future billing date for the
given horizon period.
D. Dates From To : These date has meaning when item level has certain validity . Billing plan will be
deactivated after validly expired on item level.
Example- Rental contract has two line Items.
Item 10- Header plan- validity from 27.08.2015 Until 26.08.2016 . (Billing dates created up to 26.08.2016)
Item 20 Item level Dates from 27.08.2015 to Dates Until 26.09.2015 .So Item second has validly only until
26.09.2015.(Billing dates created up to 26.09.2015)
E. Rule for Origin of Next Billing/Invoice Date :- This is copied from customization , The rule assigned here
is compared with start date and billing dates are proposed in the contract.Please refer to point number A.
F. Rules for determining deviation in Billing/Invoice date :This field determines if there is exception or deviation in billing dates proposed by billing rule .The customer
is to be billed retrospectively for the rental of a photocopier at the end of every month. The customer,
however,wants to be billed two days before the end of each month. You enter a date determination rule, which
subtracts two days from the billing date determined by the system.
Example :- Your client is billing the customer at the end of every month. Client wants to bill the customer 2
days before end of the month. With deviation rule you can force system to calculate billing date before or after
deviation days .
G. Days in year/Days in Month :- Give number of days in year or months if rental contract has to be billed
for given number of days in month or days in year.
H. Autom. Date Creation in Billing/Invoicing Plan Maintenance:-Mark this (X) if you want system to
propose billing /invoice dates automatically . Leave it blank if you want to enter the billing date manually .
Before : If you do not check (X)
I. Billing/Invoice Creation in Advance :- Check (X) this field if you want to system to propose advance
billing date (rental on 1st date of the months ).
Example Client has retroactive rental contract with customer
Before Check- Rental contract 1 yr.
01-01-2015 to 31-01-2015 .System proposing billing date on 31-01-2015 .
After check (X)- Rental contract 1 yr.
01-01-2015 to 31-01-2015 .System will propose billing date on 01-01-2015.
J. Automatic creation of correction dates in Billing Plan :- If this field is checked (X) , system can
determines if correction date has to be proposed .
Logic if End date of or To date changed and it falls before the last billed date , System propose a correction
date and correction amount automatically
Example In the below screen customer was billed for the period of billing Plan dated 01.07.2015 until
31.07.2015 for 100 Euro . But later contract was foreclosed dated 25.07.2015.Credit issued to the customer for
the period of 26.07.2015 to 31.07.2015
2. Define Date Description:Date descriptions are defined to describe the various purposes for which billing Plans can be used.This is only
for description only. It has no effect in transaction.
Path Spro> S&D >Billing >Define Date Description
3. Define and assign Date Category:Path Spro> S&D >Billing >Define and assign Date Category
Date category has following information.
i. Billing Plan type- Periodic billing
ii. Date category Its free text
iii. Date description Date description proposed as maintained in previous step.
iv. Billing Rule assign the billing rule to period billing .
v. Pricing If you want to carry out new pricing at the time of billing.
vi. Billing Type- This is the default billing type proposed at the time of contract creation in billing Plan.
5. Assigning Billing Plan Types to Sales Document Type :- This assignment will tie sales document type
with header periodic billing plan.
This is the last section of the documentation for periodic billing plan.Please proceed with T-code va41 and test
on different scenarios .
Milestone Billing.
Skip to end of metadata
Milestone Billing.
1. Create New Sales Order Type, say ZOR (Copy of OR) through T.Code: VOV8
Maintain Delivery Type as LF & Billing Type As 'F1' - Order Related / 'F2' Delivery Related.
IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Header > Define Sales Documents Types
2. Assign New Sales Document Type to Sales Area, For Eg:
1000 (S.Org) / 10 (D.Channel) / 10 (Division) / ZOR (S.O Type)
IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Header > Assign Sales Area to Sales
Document Type
3. Create New Item Category, say ZTAN - Copy of TAN (For delivery Related) / ZTAD - Copy of TAD (For Order realted) /
ZTAS - copy of TAS (For Third Party)
Maintain as under (others remaining same)
Billing Relevance: I
Billing Plan Type: 01
IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Item > Define Item Category
4. Assign Item Category, for ex (assuming Usage & higher level item category as blank):
Sales Document Type | Item Category Group | Default Item Category
ZOR | NORM | ZTAN
ZOR | DEIN | ZTAD
ZOR | BANS | ZTAS
IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Item > Assign Item Category
Note: In the above Billing Type '01' plays the main controller for milestone billing. In Sales order, at item level, we require to
maintain the billing plan.
Follow the Sales cycle as normal sales cycle for particular Scenarios
Periodic Billing
Skip to end of metadata
3. Create New Item Category, say ZTAN - Copy of TAN (For delivery Related) / ZTAD - Copy of TAD (For Order realted) /
ZTAS - copy of TAS (For Third Party)
Maintain as under (others remaining same)
Billing Relevance: I
Billing Plan Type: 02
IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Item > Define Item Category
4. Assign Item Category, for ex (assuming Usage & higher level item category as blank):
Sales Document Type | Item Category Group | Default Item Category
ZOR | NORM | ZTAN
ZOR | DEIN | ZTAD
ZOR | BANS | ZTAS
IMG > Sales and Distribution > Sales > Sales Documents > Sales Document Item > Assign Item Category
Note: In the above Billing Type '02' plays the main controller for periodic billing. In Sales order, at item level, we require to
maintain the billing plan.
Follow the Sales cycle as normal sales cycle for particular Scenarios