Documente Academic
Documente Profesional
Documente Cultură
12) GU Dual-Mode
Commissioning Guide
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATION you agree to the following terms. If you
do not agree to the following terms, please notice that you are not allowed to use this document.
Copyright 2016 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer,
distribution, use or disclosure of this document or any portion of this document, in any form by any
means, without the prior written consent of ZTE CORPORATION is prohibited.
and
are registered trademarks of ZTE CORPORATION. ZTEs company name, logo
and product names referenced herein are either trademarks or registered trademarks of ZTE
CORPORATION. Other product and company names mentioned herein may be trademarks or
trade names of their respective owners. Without the prior written consent of ZTE CORPORATION
or the third party owner thereof, anyones access to this document should not be construed as
granting, by implication, estopped or otherwise, any license or right to use any marks appearing in
the document.
The design of this product complies with requirements of environmental protection and personal
security. This product shall be stored, used or discarded in accordance with product manual,
relevant contract or laws and regulations in relevant country (countries).
This document is provided as is and as available. Information contained in this document is
subject to continuous update without further notice due to improvement and update of ZTE
CORPORATIONs products and technologies.
ZTE CORPORATION
Address
:
Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
Website:
http://dms.zte.com.cn
Email:
TSM.Aftersales@zte.com.cn
1(8)
Revision History
Product Version
Document Version
Serial Number
R1.0
Author
Date
2013-6-18
Document Version
R1.0
Prepared
by
Ma
Chunxin
Reviewed by
Chen Taiming
Approved by
Chen Taiming
2(8)
Proposal: Before reading this document, you had better have the following knowledge and skills.
SE
Q
Reference material
Description
4(8)
TABLE OF CONTENT
1
1.1
1.2
1.3
1.4
Commissioning Preparations.........................................................................1
Overview............................................................................................................ 1
Preparations of Commissioning Tools................................................................1
Preparations for Commissioning Software.........................................................1
Preparations of Commissioning Materials..........................................................1
2
2.1
2.1.1
2.1.2
2.1.3
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.3
2.3.1
3
3.1
3.2
3.3
FIGURES
Figure 2-1 Rack and Board Configuration (Instance 1)...........................................................4
Figure 2-2 Rack and Board Configuration (Instance 2)...........................................................4
Figure 2-3 Transmission Resource Planning Table (Instance 1).............................................5
Figure 3-1 Plan Data Import..................................................................................................31
Figure 3-2 Set the Path of Plan Templates...........................................................................31
Figure 3-3 View Log File.......................................................................................................32
Figure 3-4 Plan Data Export.................................................................................................32
Figure 3-5 Planning Data Export Window.............................................................................33
Figure 3-6 Data Type............................................................................................................ 33
Figure 3-7 File Path.............................................................................................................. 33
TABLES
Table 2-1 Ground Resource Planning Table............................................................................3
Table 2-2 Transmission Resource Planning Table (Instance 1)...............................................5
Table 2-3 Radio Resource Planning Table..............................................................................6
Table 2-4 Instruction of Filling in Sheets in Ground Plan Template.........................................6
Table 2-5 ManagedElement....................................................................................................9
Table 2-6 IpClock..................................................................................................................11
Table 2-7 Clock..................................................................................................................... 13
Table 2-8 RU......................................................................................................................... 15
Table 2-9 FiberCable............................................................................................................ 17
Table 2-10 RfCable............................................................................................................... 17
Table 2-11 PhyLayerPort.......................................................................................................18
Table 2-12 HDLC.................................................................................................................. 19
Table 2-13 PPP..................................................................................................................... 20
Table 2-14 IpLayerConfig......................................................................................................20
Table 2-15 Sctp..................................................................................................................... 21
Table 2-16 ItfUniBts.............................................................................................................. 22
Table 2-17 Description of Sheets in the Wireless Plan Template..........................................23
6(8)