Documente Academic
Documente Profesional
Documente Cultură
April 1996
1.1
All the testing apparatus shall be checked periodically and calibrated. Records of
such checks/calibration shall be maintained.
2.
TEST RECORDS: All records of tests and inspections shall be maintained in the
suitable forms approved by the Bureau.
2.1
Copies of any records and charts that may be required by the Bureau shall be
made available at any time on request.
2.2
2.3
3.
STANDARD MARK: The Standard Mark as given in Column (1) of the First
Schedule of the license shall be applied on the nameplate or rating-plate of each
pump set, provided always that the pump set to which the mark is thus applied
conforms to every requirement as specified in table 1.
3.1
The following information shall also be furnished on the name plate or ratingplate affixed to the pump set.
Doc:STI/14220/1
April 1996
a)
b)
c)
d)
e)
f)
g)
h)
j)
k)
m)
n)
p)
q)
r)
s)
t)
u)
3.2
The direction of the rotation of pump set shall be clearly marked on each pump
set either by incorporating an arrow on the casting or by a separate metal plate
arrow securely fitted to the pump set.
3.3
4.
5.
In respect of all other clauses of the specification and at all stages of manufacture,
the factory shall maintain appropriate controls and checks to ensure that their
product conforms to the various requirements of the specification.
6.
Doc:STI/14220/1
April 1996
7.
8.
The pump set shall be guaranteed by the manufacturer against the defect in
material and workmanship under normal use and service for a period of atleast
fifteen months from the date of dispatch or twelve months from the date of
commissioning, whichever is less.
9.
SAMPLES: The licensee shall supply to BIS, free of charge, the samples required
in accordance with Regulation 5 (12) of the Bureau of Indian Standards
(Certification) Regulations, 1988, as subsequently amended, from his factory or
godowns. The samples of Open well Submersible Pump sets so supplied would be
returned to the licensee after the tests have been carried out. The charges for
transport of such samples shall be borne by the licensee.
10.
11.
12.
Doc:STI/14220/1
April 1996
IS 14220: 1994
OPEN WELL SUBMERSIBLE PUMP SETS
(TABLE 1 LEVELS OF CONTROL
(Para 4 of the Scheme of Testing and Inspection)
Clause
TEST DETAILS
Requirements
LEVELS OF CONTROL
Test Method
Clause
(1)
(2)
(3)
Materials
Construction
Gaskets,
Packing.
7.4.6.1
Routine Tests:
No.
of
Samples
Frequency
Remarks
(4)
(5)
(6)
(7)
Reference
of
6.1
IS 14220:1994
One
Each Consignment
&
6.2
IS 14220:1994
One
Each Consignment.
7.3 &
5.6
IS:14220:1994
IS:9283:1995
a) Insulation resistance
(before HV test).
21
IS 9283:1995
7.4.6.1
Seals
c) No load running of
motor and reading of
current voltage, power
input & speed.
d) locked rotor reading
of voltage, current and
power input.
IS 14220:1994
No further testing
required
if
each
consignment
of
different raw materials
used is supported with
test
certificate
indicating conformity
to the relevant ISS.
Alternatively,
one
sample shall be tested
from
each
consignment.
Table 1 Contd.
Doc:STI/14220/1
April 1996
(1)
7.5
(2)
Hydrostatic Pressure test
on individuals parts or
pump as a whole in
assembled condition.
(3)
7.5
(4)
(5)
IS 14220:1994
(6)
Every Pump set.
Type Tests:
a)
One
b)
Measurement of stator
resistance.
7.4.6.2
7.4.6.5
IS 14220:1994
One
-do-
c)
One
-do-
d)
7.4.6.3
IS 14220:1994
One
e)
7.4.6.4
IS 14220:1994
One
-do-
f)
One
-do-
9.
10.2
One
IS 14220:1994
(7)