Sunteți pe pagina 1din 2

RENCANA ANGGARAN BIAYA (RAB)

FISIK
PEMBANGUNAN RUMAH SAKIT INTAN MULIA MERANGIN JAMBI
TA.2016
A. PEKERJAAN LANTAI BASEMENT

PEKERJAAN STRUKTUR DAN ARSITEKTUR

NO

URAIAN PEKERJAAN

VOLUME

SATUAN

HARGA

JUMLAH

KETERANGAN

A1. PEKERJAAN PERSIAPAN


1

Sarana Air Kerja

360.00

hari

125,000.00

45,000,000.00

Listrik

360.00

hari

250,000.00

90,000,000.00

Direksikeet - Barak Kerja

300.00

1,250,000.00

375,000,000.00

Pembersihan Lokasi

40,000.00

m2

3,000.00

120,000,000.00

Pengukuran & Pasang Bouwplank

6,314.00

m2

125,000.00

789,250,000.00

Pagar Penutup Project

1.00

ls

3,500,000.00

3,500,000.00

Papan Nama Kegiatan

1.00

ls

1,000,000.00

1,000,000.00

Jumlah Sub Pekerjaan Persiapan

1,423,750,000.00

A2. PEKERJAAN TANAH


1

Galian Tanah

Urugan Tanah Kembali

18,942.00

m3

110,000.00

2,083,620,000.00

3,788.40

m3

85,000.00

322,014,000.00

Jumlah Sub Pekerjaan Tanah

2,405,634,000.00

A3. PEKERJAAN BUANGAN


1

Buangan Tanah X Galian

11,365.20

m3

65,000.00

Jumlah Sub Pekerjaan Buangan

738,738,000.00
738,738,000.00

A4. PEKERJAAN PONDASI

Pasangan Pondasi Tiang Pancang

2,076.00

Cor Beton Sloof & Poor Setempat

350.33

165,000.00

342,540,000.00

m3

6,000,000.00

2,101,980,000.00

Jumlah Sub Pekerjaan Pondasi

2,444,520,000.00

A5. PEKERJAAN DINDING LT. BASEMENT


1

Pasangan Dinding bata trasraam

Pasangan Dinding bata 1 : 4

Cor Kolom Beton

Cor balk beton (30 X 75)

5
6

103.00

m3

1,125,000.00

115,875,000.00

95.00

m3

850,000.00

80,750,000.00

210.88

6,000,000.00

1,265,280,000.00

525.50

m3

6,000,000.00

3,153,000,000.00

Cor plat tangga dan plat

325.00

6,000,000.00

1,950,000,000.00

Kusen Pintu & Jendela Aluminium

117.00

m1

275,000.00

32,175,000.00

Pasang Dinding ACP

125.00

m2

850,000.00

106,250,000.00

Pasang Dinding Beton Turap

282.00

m3

6,000,000.00

1,692,000,000.00

Pasang Talang Tegak 3"

95.00

m1

80,000.00

7,600,000.00

10

Pasang Dinding Ruang Lift

54.90

6,000,000.00

329,400,000.00

11

Plesteran trasraam

160.00

m2

75,000.00

12,000,000.00

12

Plesteran Dinding 1 : 4

195.00

70,000.00

Jumlah Sub Pekerjaan Dinding

13,650,000.00
8,757,980,000.00

A6. PEKERJAAN ATAP LT. BASEMENT

Rangka Atap Canopy Pintu Masuk

147.00

m2

450,000.00

66,150,000.00

Pasang Atap Dak Beton

825.00

m3

6,000,000.00

4,950,000,000.00

Jumlah Sub Pekerjaan Atap

5,016,150,000.00

A7. PEKERJAAN PLAFOND LT. BASEMENT


1

Pasang Rangka dan Plafond Gypsum

Pasang List Gypsum

476.00
-

m2

125,000.00

m1

50,000.00

Jumlah Sub Pekerjaan Plafond

59,500,000.00
59,500,000.00

A8. PEKERJAAN LANTAI LT. BASEMENT

Werk floor 1:3:5

631.00

m3

1,250,000.00

788,750,000.00

Pasang Lantai Granito 60 X 60

490.00

m2

425,000.00

208,250,000.00

Pasang Keramik Lantai KM 40 X 40

103.00

m2

185,000.00

19,055,000.00

Pasang Keramik Dinding KM

147.00

190,000.00

27,930,000.00

Pasang Keramik Lantai Mushola 40 X 40

m2

185,000.00

9,065,000.00

49.00

Pasang Keramik Lantai Tempat Wudlu

49.00

m2

185,000.00

9,065,000.00

Pasang Keramik Dinding Tempat Wudlu

28.00

m2

190,000.00

5,320,000.00

Floor Drain

15.00

125,000.00

1,875,000.00

Urugan Pasir Bawah Lantai

M3

130,000.00

68,032,900.00

523.33

Jumlah Sub Pekerjaan Lantai

1,137,342,900.00
-

A9. PEKERJAAN ACCESORIES LT. BASEMENT


1

Daun Pintu Double Kaca

5.00

buah

2,000,000.00

10,000,000.00

Daun Pintu Lapis Aluminium KM

Kaca Polos 8 mm

5.00

buah

Kunci Tanam

Railing Tangga

15.00

Pasang Hak Angin

Pasang Slot Jendela

1,500,000.00

7,500,000.00

m2

450,000.00

5,616,000.00

buah

350,000.00

1,750,000.00

m1

150,000.00

2,250,000.00

13.00

buah

125,000.00

1,625,000.00

13.00

buah

75,000.00

12.48
5.00

Jumlah Sub Pekerjaan Accessories

975,000.00
29,716,000.00
-

A10. PEKERJAAN FINISHING LT. BASEMENT


1

Meni Rangka dan Pipa Dakting

1,200.00

m2

11,250.00

Pengecatan Dinding

2,224.00

m2

26,500.00

58,936,000.00

Pengecatan Plafond dan Beton

12,096.00

m2

26,500.00

320,544,000.00

Profil Siku Sudut Tiang Kolom

900.00

m1

26,500.00

23,850,000.00

Cat Minyak Railling Tangga

14.00

m2

32,000.00

448,000.00

Jumlah Sub Pekerjaan Finishing

417,278,000.00

A11. PEKERJAAN LISTRIK LT. BASEMENT


1

Titik lampu Penerang

Titik lampu Pijar

Titik Lampu TL

Stop Kontak

5
6

13,500,000.00

625.00

titik

650,000.00

406,250,000.00

40.00

titik

120,000.00

4,800,000.00

585.00

titik

350,000.00

204,750,000.00

40.00

titik

650,000.00

26,000,000.00

Saluran Parabola / TV

2.00

titik

750,000.00

1,500,000.00

Box Panel

1.00

titik

12,500,000.00

12,500,000.00

Box Sekring

2.00

titik

750,000.00

1,500,000.00

Aarde pertahanan

2.00

titik

350,000.00

Jumlah Sub Pekerjaan Listrik


A12. PEKERJAAN INSTALASI PLUMBING LT. BASEM
1

Kran Air

Pipa Air Bersih PVC 1/2''

22.00

Closet Jongkok

Closet Duduk

Floor Drain Lantai

Wastafel

120.00

700,000.00
658,000,000.00
-

buah

75,000.00

1,650,000.00

m1

65,000.00

7,800,000.00

4.00

buah

250,000.00

1,000,000.00

8.00

buah

3,500,000.00

28,000,000.00

12.00

buah

75,000.00

900,000.00

4.00

buah

1,250,000.00

Jumlah Sub Pekerjaan Plumbing


A13. PEKERJAAN HALAMAN LT. BASEMENT
4.00

5,000,000.00
44,350,000.00
-

Septictank dan Resapan

5,218,000.00

20,872,000.00

Saluran Air KM

60.00

m1

125,000.00

7,500,000.00

Saluran Air Kotor 4'

60.00

175,000.00

10,500,000.00

Bak Kontrol

12.00

m2

250,000.00

3,000,000.00

Rabat

120.00

125,000.00

15,000,000.00

Pemasangan Bak Kontrol

120.00

unit

250,000.00

30,000,000.00

Jumlah Sub Pekerjaan Halaman


Total Lantai Basement

unit

86,872,000.00
23,219,830,900.00