Sunteți pe pagina 1din 1

11) What are the 16 major losses ?

A)
Category
Losses

Category

Losses

1. Break down loss.

9. Management losses.

2. Set up&Adj.loss

10. Operating motion loss.

3. Tool change loss.

11. Line organization losses.

Seven major
losses that can 4. Start up loss.
impede
equipment 5. Minor stoppage
efficiency
& idling loss.

12. Arrangement losses


Five major
losses
13. Measurement
that can
& adjustment losses.
impede
equipment 14. Yield loss.
efficiency

6. Speed loss.
7. Defects
&Rework loss.

15. Energy loss

Losses that can


impede
8. Shut down loss.
equipment
operation rate

16. Die &Tool loss

12) How OEE is calculated?


Tot.Avl.time - Loss time
A) Availability =
Tot.Avl.time

12
460min - 60min
Availability

= 0.87
460min

B) Performance Rate

Standard cycle time * Parts actually produced

Operating available time


0.5min/unit*400 - 400 units
performance Rate

= 0.5
400mins

No of OK parts
C) Quality Rate

=
Total parts produced

Quality Rate

400 Units-8units

= .98

400 units
Over all equipment effectiveness = Availability*Performance*Quality
Over all equipment effectiveness = 0.87 * 0.50* 0.98= 0.426 =42.6%