Length of the Proposed Distribution network in Palakonda

Pipe Diameter
S.No

Name of the Zone

Zone-I

110

160

200

250

300

350

16529

625

50

Zone-II

7555

90

Zone-III

5905

Zone-IV

25456

961

520

2100

605

150

GRAND TOTAL

55445

1676

570

2100

605

150

Pumping Main
Infiltrationwell to A
A-B
A-C
C-D
C-E
E-F
E-G

Length Dia
4101
1417
123
109
805
2090
433
9078

350
150
250
150
250
150
250

350
300
250
200
150
100

Palakonda

Total Length in 'M'


17204
15063
9015

S.No
1
2
3

Source
GOI
State
ULB
Total

2014-15
Total
13.06
1.63
1.63
16.33

12192
53474

4101
0
1361
0
3616
9078

40.83

32.66
4.08

16.33
24.50

2015-2016
Total
19.60
2.45
2.45
24.50

3266.06
408.26

Grand Total
32.66
4.08
4.08
40.83

13.06
1.63

19.60
2.45

Page 4 of 3205

PALAKONDA NAGARA PANCHAYAT

Comprehensive Water Supply Scheme for Palakonda Nagara Panchayat


GENERAL ABSTRACT
S.No

Details

Amount in Lakhs

A
1

Construction of Infiltration Gallery across NAGAVALI River and 600 mm NP3 S/S connecting main

383.67

Construction of Inspection Wells (4m dia) for Infiltration Gallery in NAGAVALI River

94.70

Construction of Collection Well (6m dia) in NAGAVALI River

23.24

Construction of Infiltration Well Cum Pump room (8m dia)

55.50

Laying of DI K9 feeder mains from proposed Infiltration Well to ELSR's

610.97

Construction of 1400 KL RCC ELSR of 15m staging -Zone - IV

256.15

Laying of distribution network

Laying of Distribution net work in palakonda

Construction of Compound Walls around the proposed structures and existing ELSRs

Constructions of Watchman quarters at Infiltration well and at existing and Proposed ELSRS (5 No.s)

54.2

10

Construction of Generator room ( 8.00 x 5.00m ) at Infiltration well

7.45

11

Providing suitable pump sets: 38.5 KW Pump sets 3 Nos at Infiltration well

36.90

12

Providing suitable Generator sets : 125 KVA at Infiltration well

11.90

13

Supply, delivery, installation of Out door Transfarmers at Infiltration well

14

Providing DP structures, charges payble to APCPDCL for external electrification and Dedicated Power Supply at
Source etc,. Lumpsum

15

Providing Water supply House Service Connections for Existing connections including water meter and chamber.

16

Providing Water supply House Service Connections for new connections including water meter and chamber.

710.84
31.71

3.85

(A) Sub Total


B

Seignorage Charges

17

Seignorage Charges

275.43
94.00

2701.22

21.40
( A+B ) Sub Total

VAT & Labour Cess

18

VAT @ 5%

19

Labour Cess @ 1%

Contingencies & Administrative Charges

20

Provision for physical contingencies towards U/F items of works etc,. @ 3%

21

Provision for administrative charges @ 0.5%

2722.62

136.13
27.23
( A+B+C ) Sub Total

2885.98

81.04
13.51

( A+B+C+D ) Total of Admissible Components


22

50.71

Operation and Maintanance of the scheme for the 1st 2 years during the Defect Liability period.

GA 337269598.xlsx

2980.53
163.92

Page 5 of 3205

S.No

Details

Amount in Lakhs

23

Operation and Maintanance of the scheme for the 5 years after the Defect Liability period.

24

Provision towards Acquisition of Land for construction of Watchman Quarter

25

Provision for Consultancy charges @ 1% ( funded by GOI under different head )

26

Provision for 3rd party quality control charges and project management consultancy charges etc.@ 0.8%

27

Provision for capacity building @ 0.5%

28

Provision for hiring inspection vehicles

29

Provision for Price variation

30

Provision towards road cutting charges payble to R&B Dept.

31

Provision towards Tender premium and other contingencies.

32

Provision towards unforeseen items

679.85

25.00
29.81
23.84
14.90
25.20
135.06
100.00
135.06
-230.58

( E ) Total of Inadmissible Components

1102.05

( A+B+C+D ) + ( E ) Total Project Cost Rs. In Lakhs

4082.58

Say

40.83 Crores

GA 337269598.xlsx

Page 6 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat

CONSTRUCTION OF INFILTRATION GALLERY ACROSS NAGAVALI RIVER AND 600 mm NP3 S/S CONNECTING MAIN
DETAILED AND ABSTRACT ESTIMATE
S No

Description of Item

Excavation of trenches for infiltration galleries, syphon lines and connecting mains in all soils
under water including all leads, lifts, shoring, strutting, bailing out water and removal of shoring
and strutting materials, after completion of pipe line work.

Infiltration gallery
0m to 1.0 m depth
1.00m to 2.00m depth
2.00m to 5.00m depth
5.00m to 6.00m depth
6.00m to 6.80m depth
RBR-FNDN-1- (i-B) - In ordinary soils, by Mechanical means
Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical
specifications including setting out, construction of shoring and bracing, removal of stumps
and other deleterious material , dressing of sides and bottom as per Technical Specification
304 MORTH and as directed by the departmental officer including protecting the existing
utility services wherever it is possible during the execution and taking all precautionary
measures in the restricted areas for laying sewer/water lines including divertion of traffic and
backfilling in trenches with excavated suitable material and disposal of remaining earth upto
a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines
by mechanical means.including Dewatering

Nos

Qty

Rate

Per

Amount

Data Ws New
S.No.80
3
3
3
3
3

x
x
x
x
x

1
1
1
1
1

210.00
210.00
210.00
210.00
210.00

5.00
5.00
5.00
5.00
5.00

1.00
1.00
3.00
1.00
0.80

3150.00 Cum
3150.00 Cum
9450.00 Cum
3150.00 Cum
2520.00 Cum

1326.00
1899.30
2850.83
3395.50
3940.17

10 Cum
10 Cum
10 Cum
10 Cum
10 Cum

417690.00
598280.00
2694034.00
1069583.00
992923.00

Data Ws New
S.No.5, 10 & 12
a

Connecting main from Collection Well to Infiltration well


0m to 3.0 m depth
3.00m to 6.00m depth
6.00m to 6.80m depth
Manufacture, supply and delivery of RCC NP3 class Pipes including cost and conveyance of
all material etc, complete.

1
1
1

i) 600 mm dia s/s perforated pipe


BLD-CSTN-2-8 (16): Collection ,Supply and filling of Fine Sand from approved quarry to work
site and stacking at work site to Dept. gauge for premeasurements
including cost and
convenyance of all material and all labour charges etc. complete as per standard
specifications. Clause 305.3.9 MORD & 304 MORTH

Below Gallary
Supply and filling 12m to 20mm metal as filter media as per approved section including all
labour charges and incidental charges etc complete

Below RCC Pipe


Suplly and filling of 40mm size HBG metal as filter media as per approved section including all
labour charges and incidental charges etc, complete

Below RCC Pipe

x
x
x

1
1
1

30.00
30.00
30.00

2.00
2.00
2.00

3.00
3.00
0.80

210.00

210.00

210.00

210.00

Inf.Gallary - 337269598.xlsx

5.00

3.00

3.00

1.00

0.10

0.20

180.00 Cum
180.00 Cum
48.00 Cum

99.12
107.88
137.46

1 Cum
1 Cum
1 Cum

17842.00
19418.00
6598.00

630.00 Rmt

Data Ws New
S.No.189 f
3819.13

1 Rmt

2406052.00

3150.00 Cum

Data Ws New
S.No.87
1165.74

1 Cum

3672081.00

189.00 Cum

Data Ws New
S.No.84
2149.72

1 Cum

406297.00

378.00 Cum

Data Ws New
S.No.83
1735.03

1 Cum

655841.00

Page 7 of 3205

S No

Description of Item

Laying and jointing perforated RCC pipes inclusive of bailing out water and jointing with
cement fillets and all other incidental charges for infiltration gallery inclusive of bailing out
water by pumping to keep the trench reasonably dry to facilitate the work excluding cost of
perforated pipes and collars.

i) 600 mm dia s/s perforated pipe


Suplly and filling of 40mm size HBG metal as filter media as per approved section including all
labour charges and incidental charges etc, complete

Deduct pipe volume (600mm dia RCC pipe -OD-0.77m)


9

210.00

630.00 Rmt

3
-3

x
x

1
3.14

210.00
0.385

1.62
0.385

1.15
210.00

1173.69
-293.22
880.47 Cum

3
-3

x
x

1
1

210.00
210.00

2.08
1.62

1.38
1.15

1808.35
-1173.69
634.66 Cum

Rate

Data Ws New
S.No.81 b
981.63

Per

Amount

1 Rmt

618427.00

1735.03
Data Ws New
S.No.84

1 Cum

1527642.00

2149.72

1 Cum

1364341.00

1 Cum

1358623.00

Data Ws New
S.No.85
3
-3

x
x

1
1

210.00
210.00

2.54
2.08

1.61
1.38

2576.32
-1808.35
767.97 Cum

1769.11

Data Ws New
S.No.86
3
-3

x
x

1
1

210.00
210.00

3.00
2.54

1.84
1.61

3477.60
-2576.32
901.28 Cum

995.32

1 Cum

897062.00

1134.00 Cum

Data Ws New
S.No.87
1165.74

1 Cum

1321949.00

1 Cum

18204377.00

Supply and filling fine sand passing through 1.70mm sieve and retained on 0.70 mm sewer as
filter madia as per approved sections including cost and conveyance of all material labour
charges for screening and filling etc.,
x

210.00

3.00

0.60

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Filter Media Sand from approved quarry
to work site and stacking at work site to Dept. gauge for premeasurements
including cost
and convenyance of all material and all labour charges etc. complete as per standard
specifications. Clause 305.3.9 MORD & 304 MORTH
Gallary portion
Deduct filter media Qty(-)

14

Qty

Data Ws New
S.No.83

3
13

Supply and filling course sand passing through 3.35mm sieve and retained on 1.70mm sewer
as filter media as per approved sections including cost and conveyance of all material labour
charges for screening and filling etc.

Deduct 6 to 12mm size metal Qty


12

Supply and filling of 6mm to 12mm size HBG metal as filter media as per approved section
including all labour charges and incidental chareges etc, complete

Deduct 12 to 20mm size metal Qty


11

Supply and filling 12m to 20mm metal as filter media as per approved section including all
labour charges and incidental charges etc complete
Deduct 40mm size metal Qty

10

Nos

Data Ws New
S.No.88
3
-3

x
x

1
1

210.00
210.00

5.00
3.00

5.80
2.74

18270.00
-5178.60
13091.40 Cum

1390.56

BLD-CSTN-2-9 (17) ; Filling with useful available excavated earth (excluding rock) in trenches,
sides of foundations and basement with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and ramming including cost and conveyance of
water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
Data Ws New
S.No.18
Total Excavated quantity
Deduct pipe volume (600mm dia RCC pipe -OD-0.77m)

-1

3.14

0.385

Inf.Gallary - 337269598.xlsx

0.385

30.00

408.00
-13.96

Page 8 of 3205

S No

Description of Item

15

PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines
including cost and conveyance of all materials, labour charges and removal of shoring and
shuttering at appropriate places as directed by the departmental officers with all incidental and
ooperational charges etc, complete.
for connection main - Double staging up to 4.50m depth

Nos

30.00

Qty

4.50

Rate

Per

394.04 Cum

239.23

1 Cum

94266.00

270.00 Sqm

Data Ws New
S.No.13 b
86.58

1 Sqm

23377.00
38366703.00
383.67 Lakhs

Say Rs.

Inf.Gallary - 337269598.xlsx

Amount

Page 9 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat

Sub-work : Construction of Inspection Wells for Infiltration Gallery in NAGAVALI River


DETAILED & ABSTRACT ESTIMATION
S.N.

Description

Nos.

MEASUREMENTS
B
D

Quantity

Rate

Per

Amount

INSPECTION WELLS ON INFILTRATION GALLARY AT EVERY 90.00M

*
1

Collection well EWE - Pi x r2 x h , Dia of the Well 4.00m + Wall Thick ness-2x0.45m + Toe 2 x 0.75m + PCC
off set 2x0.10 + working space- 2 x 1.50m ) =Total dia = 15.60 m -1.50m off set for every 3.00m depth

EWE from 3 m to 6 m
RBR-FNDN-1 - A - iii - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-Machanical Means- above 6.00m
depth.

EWE from 6 m to 6.75 m

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal
mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.

Earth work Excavation up to 3.00m depth


RBR-FNDN-1 - A - i - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-By Mechanical means-Upto 3 m
depth.
EWE from 0 m to 3 m
RBR-FNDN-1 - A - ii - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-Machanical Means- 3 m to 6.00m
depth.

r2

for Bed below Base slab at (-) 6.75 m depth

3.14

3.14

7.80

6.30

7.80

6.30

3.00

3.00

573.11

Data Ws New
S.No.5
Cum
99.12

1 Cum

56807.00

373.88

Data Ws New
S.No.183
Cum
113.27

1 Cum

42349.00

137.46

1 Cum

7459.00

Data Ws New
S.No.95
Cum
4177.90

1 Cum

21433.00

Data Ws New
S.No.12

3.14

3.14

Insp.Wells -337269598.xlsx

4.80

3.30

4.80

3.30

0.75

0.15

54.26
54.26

5.13

Cum

Page 10 of 3205

S.N.

Description

Nos.

BLD-CSTN-3-14-(31)-A
Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER /
MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.
402)with minimum cement content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below
Plinth)

MEASUREMENTS
B
D

Quantity

Rate

Per

Amount

Data Ws New
S.No.96
for Base Slab at (-) 6.3 m depth
for Haunch portion - inner side (1/2 x 2Pi x r x t x h )
for Haunch portion - outer side
6

1
0.5
0.5

x
x
x

3.14
6.28
6.28

3.20
1.850
2.600

3.20
0.30
0.30

0.45
0.30
0.30
Say

14.47
0.52
0.73
15.72

Cum

9232.39

1 Cum

145133.00

11526.54
11479.95
11433.37
11386.79
11340.21

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

54405.00
72209.00
71916.00
71623.00
213876.00

Data Ws New
S.No.98
Cum
9602.31

1 Cum

42058.00

BLD-CSTN-3-15-(31)-B
Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER /
MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.
402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS -Circular walls Thickness of 450mm
Data Ws New
S.No.97

a
b
c
d
e
7

Circular walls of the well


from (-) 6.75 m to (-) 6 m
from (-) 6 m to (-) 5 m
from (-) 5 m to (-) 4 m
from (-) 4 m to + 3 m
from (-) 3 m to + 0 m
BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the
department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but
excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

150mm Roof slab of the well at 2.3 m Height

2
2
2
2
2

x
x
x
x
x

3.14
3.14
3.14
3.14
3.14

3.14

Insp.Wells -337269598.xlsx

2.225
2.225
2.225
2.225
2.225

3.05

0.45
0.45
0.45
0.45
0.45

3.05

0.75
1.00
1.00
1.00
3.00

0.15

4.72
6.29
6.29
6.29
18.86

4.38

Cum
Cum
Cum
Cum
Cum

10

Page 11 of 3205

S.N.

Description

Nos.

BLD-CSTN-4-1-(34)
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel
bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour
charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills
for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of
binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in
position, tying including sales and other taxes on all materials etc., complete for finished item of work in all
floors.( APSS No.126

MEASUREMENTS
B
D

Quantity

Rate

Per

Amount

Data Ws New
S.No.40
Base slab
M-30 Wall of Intake well
Roof Slab of intake well

1
1
1

x
x
x

1
1
1

15.72
23.59
4.38

150.00 Kg/Cum
160.00 Kg/Cum
100.00 Kg/Cum

Total
IRR-DAW-2-12:
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm )
grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of
all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in
position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm
x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm
height approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top
edges of kerb and coping chamferred or rounded as directed etc., complete ( excluding cost of providing and
placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 300 kg / cum
with use of super plasticiser(0.4% by wt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44
cum)

2358.00 Kg
3774.40 Kg
438.00 Kg
6570.40 Kg
6.58 MT

52081.12

1 MT

342694.00

2724.23

1 Rmt

58380.00

Data Ws New
S.No.20
hphr
60.22

1 hphr

165605.00

1 Cum

204106.00

Data Ws New
S.No.107
Railing for Intake well Bolcony
Deductions for Entrance (2.5+1.5)

2
-1

x
x

3.14
1

4.05
4.00

25.43
-4.00
21.43 Rmt

10 Bailing of water from pipe line thickness with oil engine driven pump sets including hire charges, fuel charges
and wages for driver and helper etc., completed
Considring 50 days at 8 hours per day with 5Hp motor
11 BLD-CSTN-2-9 (17)
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and
ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,
hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

50

5.00

11.00

2750.00

Data Ws New
S.No.18
Total excavation Qty
Deduct CC bed Qty
Deduct base slab and haunch portions
Deduct Well Qty. up to GL

-1

3.14

Insp.Wells -337269598.xlsx

2.450

2.450

6.75

1001.25
-5.13
-15.72
-127.22
853.18

Cum

Cum

239.23

11

Page 12 of 3205

S.N.

Description

Nos.

MEASUREMENTS
B
D

Rate

Per

82.00 Kg

Data Ws New
S.No.65
66.39

1 Kg

5444.00

1 No

Data Ws New
S.No.138
2796.75

1 No

2797.00
1578294.00
9469764.00
94.70 Lakhs

Quantity

Amount

12 Manufacturing, supply and erection of 600 mm width ladders with 50 X 50 X 6 mm MS angles 2 nos verticals
and horizontals fixed at 25 cm c/c as per aprooved drawing and as directed by the departmental officers and
painting both sides with anti corrosive paint two coats over one coat of primary coat including cost of all
materials fabrication, welding transportation to site, all taxex and duties, fixing in position duly embodying in
CC (1:1.5:3) prop., and all other incidental and operational charges etc., complete for finished item of work.

Ladder with Landings etc


13 Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers and frames anywhere in
A.P., F.O.R. destination including, loading, un-loading & stacking at site ,central excise duty,but excluding
sales tax, octroi and other Govt levies etc., as applicable.
Supply and fixing of RCC Man hole of 560mm dia

82.00 Kg

Cost of 1 unit
Cost for 6 Units
Say Rs.

Insp.Wells -337269598.xlsx

12

Page 13 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat

Sub-work : Construction of Collection Well in NAGAVALI River


DETAILED & ABSTRACT ESTIMATION
S.N.

Description

Nos.

MEASUREMENTS
B
D

Quantity

Rate

Per

Amount

COLLECTION WELL

*
1

Collection well EWE - Pi x r2 x h , Dia of the Well 6.00m + Wall Thick ness-2x0.45m + Toe 2 x 0.75m + PCC
off set 2x0.10 + working space- 2 x 1.50m ) =Total dia = 17.60 m -1.50m off set for every 3.00m depth

EWE from 3 m to 6 m
RBR-FNDN-1 - A - iii - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-Machanical Means- above 6.00m
depth.

EWE from 6 m to 6.75 m

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal
mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.

Earth work Excavation up to 3.00m depth


RBR-FNDN-1 - A - i - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-By Mechanical means-Upto 3 m
depth.
EWE from 0 m to 3 m
RBR-FNDN-1 - A - ii - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-Machanical Means- 3 m to 6.00m
depth.

r2

for Bed below Base slab at (-) 9.5 m depth

3.14

3.14

8.80

7.30

8.80

7.30

3.00

3.00

729.48

Data Ws New
S.No.5
Cum
99.12

1 Cum

72306.00

501.99

Data Ws New
S.No.183
Cum
113.27

1 Cum

56860.00

137.46

1 Cum

10890.00

Data Ws New
S.No.95
Cum
4317.64

1 Cum

37607.00

Data Ws New
S.No.12

3.14

3.14

Coll.Well -337269598.xlsx

5.80

4.30

5.80

4.30

0.75

0.15

79.22
79.22

8.71

Cum

13

Page 14 of 3205

S.N.

Description

Nos.

BLD-CSTN-3-14-(31)-A
Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER /
MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.
402)with minimum cement content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below
Plinth)

MEASUREMENTS
B
D

Quantity

Rate

Per

Amount

Data Ws New
S.No.96
for Base Slab at (-) 9.05 m depth
for Haunch portion - inner side (1/2 x 2Pi x r x t x h )
for Haunch portion - outer side
6

1
0.5
0.5

x
x
x

3.14
6.28
6.28

4.20
2.850
3.600

4.20
0.30
0.30

0.45
0.30
0.30
Say

24.93
0.81
1.02
26.76

Cum

9232.39

1 Cum

247059.00

11526.54
11479.95
11433.37
11386.79
11340.21

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

105007.00
104582.00
104158.00
103734.00
310041.00

Data Ws New
S.No.98
Cum
9602.31

1 Cum

74226.00

BLD-CSTN-3-15-(31)-B
Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER /
MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.
402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS -Circular walls Thickness of 450mm
Data Ws New
S.No.97

a
b
c
d
e
7

Circular walls of the well


from (-) 6.75 m to (-) 6 m
from (-) 6 m to (-) 5 m
from (-) 5 m to (-) 4 m
from (-) 4 m to - 3 m
from (-) 3 m to - 0 m
BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the
department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but
excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

150mm Roof slab of the well at 9.05 m Height

2
2
2
2
2

x
x
x
x
x

3.14
3.14
3.14
3.14
3.14

3.14

Coll.Well -337269598.xlsx

3.225
3.225
3.225
3.225
3.225

4.05

0.45
0.45
0.45
0.45
0.45

4.05

1.00
1.00
1.00
1.00
3.00

0.15

9.11
9.11
9.11
9.11
27.34

7.73

Cum
Cum
Cum
Cum
Cum

14

Page 15 of 3205

S.N.

Description

Nos.

BLD-CSTN-4-1-(34)
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel
bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour
charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills
for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of
binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in
position, tying including sales and other taxes on all materials etc., complete for finished item of work in all
floors.( APSS No.126

MEASUREMENTS
B
D

Quantity

Rate

Per

Amount

Data Ws New
S.No.40
Base slab
M-30 Wall of Intake well
Roof Slab of intake well

1
1
1

x
x
x

1
1
1

26.76
63.78
7.73

120.00 Kg/Cum
120.00 Kg/Cum
100.00 Kg/Cum

Total
IRR-DAW-2-12:
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm )
grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of
all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in
position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm
x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm
height approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top
edges of kerb and coping chamferred or rounded as directed etc., complete ( excluding cost of providing and
placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 300 kg / cum
with use of super plasticiser(0.4% by wt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44
cum)

3211.20 Kg
7653.60 Kg
773.00 Kg
11637.80 Kg
11.64 MT

52081.12

1 MT

606224.00

2724.23

1 Rmt

86385.00

Data Ws New
S.No.20
hphr
60.22

1 hphr

150550.00

1 Cum

244720.00

Data Ws New
S.No.107
Railing for Intake well Bolcony
Deductions for Entrance (2.5+1.5)

2
-1

x
x

3.14
1

5.05
4.00

31.71
31.71 Rmt

10

11

Bailing of water from pipe line thickness with oil engine driven pump sets including hire charges, fuel charges
and wages for driver and helper etc., completed
Considring 50 days at 10 hours per day with 5 Hp motor
BLD-CSTN-2-9 (17)
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and
ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,
hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

50

5.00

10.00

2500.00

Data Ws New
S.No.18
Total excavation Qty
Deduct CC bed Qty
Deduct base slab and haunch portions
Deduct Well Qty. up to GL

-1

3.14

Coll.Well -337269598.xlsx

3.450

3.450

6.75

1310.69
-8.71
-26.76
-252.27
1022.95

Cum

Cum

239.23

15

Page 16 of 3205

S.N.

Description

12

Manufacturing, supply and erection of 600 mm width ladders with 50 X 50 X 6 mm MS angles 2 nos verticals
and horizontals fixed at 25 cm c/c as per aprooved drawing and as directed by the departmental officers and
painting both sides with anti corrosive paint two coats over one coat of primary coat including cost of all
materials fabrication, welding transportation to site, all taxex and duties, fixing in position duly embodying in
CC (1:1.5:3) prop., and all other incidental and operational charges etc., complete for finished item of work.

13

Nos.

Ladder with Landings etc


Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers and frames anywhere in
A.P., F.O.R. destination including, loading, un-loading & stacking at site ,central excise duty,but excluding
sales tax, octroi and other Govt levies etc., as applicable.

Supply and fixing of RCC Man hole of 560mm dia

MEASUREMENTS
B
D

100.00 Kg

Rate

Per

100.00 Kg

Data Ws New
S.No.65
66.39

1 Kg

6639.00

1 No

Data Ws New
S.No.138
2796.75

1 No

2797.00
2323785.00
23.24 Lakhs

Quantity

Total Rs
Say Rs.

Coll.Well -337269598.xlsx

Amount

16

Page 17 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat

Sub-work : Construction of Infiltration Well Cum Pump room


DETAILED & ABSTRACT ESTIMATION
S.N.

Description

COLLECTION WELL
Intake well EWE - Pi x r2 x h , Dia of the Well 8.00m + Wall Thick ness-2x0.30m + Toe 2 x 0.75m + PCC off
set 2x0.10 + working space- 2 x 1.50m ) =Total dia = 13.60 m -1.50m off set for every 3.00m depth

Nos.

EWE from 3 m to 6 m
RBR-FNDN-1 - A - iii - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-Machanical Means- above 6.00m
depth.

EWE from 6 m to 9 m
EWE from 9 m to 10.1 m

1
1

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal
mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in
15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.

MEASUREMENTS
B
D

r2

Quantity

for Bed below Base slab at (-) 9.95 m depth

3.14

3.14

12.80

11.30

Rate

Per

Amount

Earth work Excavation up to 3.00m depth


RBR-FNDN-1 - A - i - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-By Mechanical means-Upto 3 m
depth.
EWE from 0 m to 3 m
RBR-FNDN-1 - A - ii - Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - Ordinary
Soils : for Sumps, Thrust Blocks and Man Holes etc,. Ordinary soils-Machanical Means- 3 m to 6.00m
depth.

12.80

11.30

3.00

3.00

1543.37

Data Ws New
S.No.5
Cum
99.12

1 Cum

152979.00

1202.84

Data Ws New
S.No.183
Cum
113.27

1 Cum

136246.00

137.46

1 Cum

157069.00

Data Ws New
S.No.95
Cum
4317.64

1 Cum

57122.00

Data Ws New
S.No.12

x
x

3.14
3.14

3.14

337269598.xlsx - Sump Cum Pump

9.80
8.30

5.30

9.80
8.30

5.30

3.00
1.10

0.15

904.70
237.95
1142.65

13.23

Cum

17

Page 18 of 3205

S.N.

Description

Nos.

BLD-CSTN-3-14-(31)-A
Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER /
MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.
402)with minimum cement content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below
Plinth)

MEASUREMENTS
B
D

Quantity

Rate

Per

Amount

Data Ws New
S.No.96
for Base Slab at (-) 9.5 m depth
for Haunch portion - inner side (1/2 x 2Pi x r x t x h )
for Haunch portion - outer side
6

1
0.5
0.5

x
x
x

3.14
6.28
6.28

5.20
3.850
4.600

5.20
0.30
0.30

0.45
0.30
0.30
Say

38.21
1.09
1.30
40.60

Cum

9325.55

1 Cum

378617.00

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

138183.00
137627.00
137071.00
136514.00
135958.00
406206.00
203103.00

1 Cum
1 Cum

70307.00
40478.00

BLD-CSTN-3-15-(31)-B
Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER /
MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.
402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS -Circular walls Thickness of 350mm
Data Ws New
S.No.97

a
b
c
d
e
f
g
7

Circular walls of the Intake well


from (-) 8 m to (-) 7 m
from (-) 7 m to (-) 6 m
from (-) 6 m to (-) 5 m
from (-) 5 m to (-) 4 m
from (-) 4 m to (-) 3 m
from (-) 3 m to (-) 0 m
from 0.00 m to 1.5 m above GL
BLD-CSTN-5-4-(42)
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop
including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding
charges lift charges , curing charges etc., complete for finished item of work
Brick walls for Pump room up to 3.66m height from Intake well roof slab
Deduction for Rolling Shutter of Pump room
Deduction for Pump Room Windows
Deduction for Pump Room Ventilators
Deduction for Columns Qty
Total Qty of "a"
Brick walls for Pump room from 3.66m to 5.00 m height

2
2
2
2
2
2
2

x
x
x
x
x
x
x

3.14
3.14
3.14
3.14
3.14
3.14
3.14

4.225
4.225
4.225
4.225
4.225
4.225
4.225

0.45
0.45
0.45
0.45
0.45
0.45
0.45

1.00
1.00
1.00
1.00
1.00
3.00
1.50

11.94
11.94
11.94
11.94
11.94
35.82
17.91

Cum
Cum
Cum
Cum
Cum
Cum
Cum

11573.12
11526.54
11479.95
11433.37
11386.79
11340.21
11340.21

Data WS New
S.No. 110

2
-1
-1
-1

x
x
x
x

3.14
1
6
6

4.335
2.50
1.50
1.50

0.23
0.23
0.23
0.23

3.66
2.50
1.20
0.45

3.14

4.335

0.23

1.34

337269598.xlsx - Sump Cum Pump

22.92
-1.44
-2.48
-0.93
-2.36
15.71
8.39

Cum
Cum

4475.33
4824.56

18

Page 19 of 3205

S.N.

Description

Nos.

BLD-CSTN-3-14-(31)-B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS,
RCC WALLS IN BUILDINGS

MEASUREMENTS
B
D

Quantity

Rate

Per

Amount

Data WS New
S.No.100

A
B

Columns for Pump Room up to 3.66m height


Columns for Pump Room from 3.66m to 5.00m height
Lintels over Pump Room openings
over Rolling Shutter
over Pump Room Windows

1
1

x
x

8
8

0.23
0.23

0.35
0.35

3.66
1.34

2.36
0.86

Cum
Cum

10774.75
11486.25

1 Cum
1 Cum

25428.00
9878.00

1
1

x
x

1
6

3.00
2.00

0.23
0.23

0.20
0.15

0.14
0.41
0.55

Cum

12984.10

1 Cum

7141.00

BLD-CSTN-3-16-(31)-C
Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER /
MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.
402)with minimum cement content as per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of
steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

Data WS New
S.No.101

a
b

250mm Roof slab of Intake well at 9.5 m Height


125mm Roof slab of Intake well Bolcony up to3.66m Height
for Ramp

1
2
1

x
x
x

3.14
3.14
1.00

4.45
4.95
2.00

4.45
1.00
3.50

0.25
0.15
0.15

c
d

125 mm Roof Slab of Pump room( including 0.90m extended at 5.00m Height
Pump room main Beams at 5.00m height
Pump room extended slab Beams at 5.00m height

1
1
1

x
x
x

3.14
4
4

5.35
8.90
0.90

5.35
0.23
0.23

0.12
0.45
0.25

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end and 50mm th. at free end
over Door
over Windows

Total beam Qty.

10

1
1

x
x

1
6

3.00
2.00

0.60
0.60

15.54
4.66
1.05
5.71
10.34
3.68
0.21
3.89
1.80
7.20
9.00

Cum

20989.14

1 Cum

326171.00

Cum
Cum

9894.87
10033.96

1 Cum
1 Cum

56500.00
103751.00

Cum

11508.68

1 Cum

44769.00

Sqm

878.95

1 Sqm

7911.00

10 Sqm
10 Sqm

34808.00
13599.00

BLD-CSTN-8-1-(76)
Plastering with 12mm thick in single coat in CM (1:3) using Sulphate Resistant Cementm finished smooth
including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing,
scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

Data WS New
S.No.103

Flooring of Intake well


for inner walls up to 3.66m above floor level
Ceiling of Bolcony at 0.60 m height
External walls of intake well above GL

1
2
2
2

x
x
x
x

3.14
3.14
3.14
3.14

4.00
4.00
4.95
4.45

for inner walls , 3.66m to 7.32 m height

3.14

4.00

337269598.xlsx - Sump Cum Pump

4.00
5.00
1.00
1.50
3.66

50.24
125.60
31.09
41.92
248.85
91.94

Sqm
Sqm

1398.74
1479.08

19

Page 20 of 3205

S.N.

Description

c
e
f
g

for inner walls , 7.32 to 9.5 m height


lnternal walls of Pump room up to 3.66m height
Ceiling of Pump room at 3.66m height
extended portion of the Pump room ceiling
Total Qty of "h"
BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top
coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like
cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges
for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary
etc., complete for finished item of work of uneven surfaces of walls. (External walls)

11

Nos.
2
2
1
2

x
x
x
x

L
3.14
3.14
3.14
3.14

MEASUREMENTS
B
D
4.00
0.84
4.22
3.66
4.22
4.22
4.95
0.90

Quantity
21.10
97.00
55.92
27.98
180.90

Rate

Per

Amount

Sqm

1537.59

10 Sqm

3244.00

Sqm

1398.74

10 Sqm

25303.00

10 Sqm

40376.00

Data WS New
S.No.104

external walls of Pump rooms


Deduction for Pump Room rolling shutter
Deduction for Pump Room Windows
Deduction for Pump Room Ventilators
12

2
-1
-1
-1

x
x
x
x

3.14
1
6
6

4.45
2.50
1.50
1.50

5.00
2.50
1.20
0.45

139.73
-6.25
-10.80
-4.05
118.63

Sqm

3403.50

BLD-CSTN-4-1-(34)
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel
bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour
charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills
for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of
binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in
position, tying including sales and other taxes on all materials etc., complete for finished item of work in all
floors.( APSS No.126
Data WS New
S.No.40

Base slab
M-30 Wall of Intake well
Pump roon beams
Roof Slab of intake well
Roof Slab of Pump room
Pump room Columns
Pump room Lintels
Sun Shades

13

1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1

40.60
113.43
3.89
21.25
10.34
2.36
0.55
0.56

Total
IRR-DAW-2-12 : Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less
than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded
aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental
parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart,
20 cm x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab
for posts and pillars with top edges of kerb and coping chamferred or rounded as directed etc., complete
( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts.
( Cement content : 300 kg / cum with use of super plasticiser(0.4% by wt. of cement, CA : 0.80 cum,
Blending Ratio of CA--65:35, FA : 0.44 cum)

120.00 Kg/Cum
120.00 Kg/Cum
150.00 Kg/Cum
100.00 Kg/Cum
100.00 Kg/Cum
150.00 Kg/Cum
80.00 Kg/Cum
60.00 Kg/Cum

4872.00 Kg
13611.60 Kg
583.50 Kg
2125.00 Kg
1034.00 Kg
354.00 Kg
44.00 Kg
33.75 Kg
22657.85 Kg
22.66 MT

52081.12

1 MT

1180158.00

Data Ws New
S.No.107
Railing for Intake well Bolcony

3.14

337269598.xlsx - Sump Cum Pump

5.45

34.23

20

Page 21 of 3205

S.N.

Description

Nos.

Deductions for Entrance (2.5+1.5)


14

15

-1

L
1

MEASUREMENTS
B
D
4.00

Quantity

Rate

-4.00
30.23 Rmt

Per

Amount

2724.23

1 Rmt

82353.00

Data Ws New
S.No.132
Sqm
3250.53

1 Sqm

20316.00

1 Sqm

63290.00

1 Kg

10380.00

10 Sqm

30299.00

Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together
through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe
shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom
locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood
cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all
accessories etc complete for finished item of work as per special spn: 1108

for Main Door


BMT-P.25 : NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS
WITH GRILL PROVISION) Providing and Fixing of windows made of pre-painted steel (Base steel as per IS
513 of 0.6mm thick galvanized as per IS 277 with Zinc of 120 GSM). Primer coated with epoxy primer of 5-7
microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns
thick alkyd backer. Section for outer frame should be of 48x50mm, centre mullion should be of 48x50mm,
section for shutter should be of 47x20mm and Fixed glass beading section should be of 12x12mm. Outer
frame and mullions to have rebate for Glazed shutter and a 20mm provision for Guard bars/Grills. The
sections are to be cut to length metre joined with corner bracket. Centre mullion is to be fixed with mullion
cap. Seccolor Handle, seccolor stay, 2 nos. of Stainless Steel heavy duty Pivot hinges shall be provided per
shutter. The windows should be panelled with 5mm thick plain float glass. Rubber Gaskets are provided all
around the glass. The above frames should be fixed to the concrete/masonry wall by means of self
expanding screws, Including 10mm Square guard bars with 6 (152.4mm) pitch etc., complete for finished
item of work.

2.50

2.50

6.25

Data Ws New
S.No.133
Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section size of
48x50mm. Shutter frame section size of 47x20mm. Mullion section size of 48x50mm. Fixed beading section
size of 12x12mm.
16

17

Pump room Windows


Supplying and fixing of MS Grill for windows and Ventilators using 25mm x 6mm MS flat alround and 10mm
MS square bars horizontally at 125mm centre to centre and vertically at 30cm centre to centre including
fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to
original surface neatly and painting grill with one coat of red oxide primer including and conveyance of all
materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for
finished item of work.

Pump room Ventilators

1.52

1.22

25.00 Kg/each

11.13 Sqm

150.00

5686.43

Data Ws New
S.No.134
Kg
69.20

BLD-CSTN-9-13-(111)
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine
crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50
m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost
of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc.,
complete for finished item of work, but excluding the cost of conveyance of all materials
Data Ws New
S.No.135

a
b

Pump room Flooring


Bolcony Flooring

1
2

x
x

3.14
3.14

337269598.xlsx - Sump Cum Pump

4.45
4.95

4.45
1.00

62.18
31.09
93.27

Sqm

3248.56

21

Page 22 of 3205

S.N.

Description

18

BLD-CSTN-10-25-(148)
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water
proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage
charges, excluding conveyance charges of materials and including all operational, incidental and labour
charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall
and slab etc,, complete for finished item of work

19

20

Nos.

Pump room Slab


BLD-CSTN-11-8-(164)
Colour washing two coats with approved Colour and quality to give an even shade after thoroughly brushing
the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour
charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding
conveyance charges of materials

Outer walls of intake well above GL


Outer walls of Pump room
Deduction for Pump Room doors
Deduction for Pump Room Windows
Deduction for Pump Room Ventilators

2
2
-1
-1
-1

3.14

MEASUREMENTS
B
D

5.35

Quantity

5.35

89.87

Rate

Data Ws New
S.No.37
Sqm
3788.55

Per

Amount

10 Sqm

34048.00

10 Sqm

629.00

Data Bld
S.No.59
x
x
x
x
x

3.14
3.14
1
6
6

4.45
4.45
2.50
1.50
1.50

1.50
3.66
2.50
1.20
0.45

41.92
102.28
-6.25
-10.80
-4.05
123.10

Sqm

51.07

BLD-CSTN-11-10-(167) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all
to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose
powdered materials, including cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
Data Bld
S.No.61
Internal Walls of Pump room
Deduction for Pump Room doors
Deduction for Pump Room Windows
Deduction for Pump Room Ventilators

21

22

23

2
-1
-1
-1

x
x
x
x

3.14
1
6
6

4.22
2.50
1.50
1.50

3.66
2.50
1.20
0.45

97.00
-6.25
-10.80
-4.05
75.90

Sqm

953.55

10 Sqm

7237.00

Sqm

Data Bld
S.No.57
210.91

10 Sqm

1179.00

Data Ws New
S.No.20
hphr
60.22

1 hphr

72264.00

BLD-CSTN-11-4- (161) ; White washing one coat with whiting of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of
all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of
work, but excluding conveyance charges of materials
Pump room Ceiling
Bailing of water from pipe line thickness with oil engine driven pump sets including hire charges, fuel charges
and wages for driver and helper etc., completed

Considring 30 days at 8 hours per day with 5Hp motor


BLD-CSTN-2-9 (17)
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and
ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,
hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

3.14

30

4.22

5.00

4.22

8.00

55.92

1200.00

Data Ws New
S.No.18
Total excavation Qty
Deduct CC bed Qty
Deduct base slab and haunch portions

3888.86
-13.23
-40.60
337269598.xlsx - Sump Cum Pump

Cum

22

Page 23 of 3205

S.N.

Description

Nos.

Deduct Well Qty. up to GL


24

25

26

-1

3.14

MEASUREMENTS
L
B
D
4.450
4.450
8.00

Quantity
-497.44
3337.59

Rate
Cum

239.23

Per
1 Cum

Amount
798452.00

Manufacturing, supply and erection of 600 mm width ladders with 50 X 50 X 6 mm MS angles 2 nos verticals
and horizontals fixed at 25 cm c/c as per aprooved drawing and as directed by the departmental officers and
painting both sides with anti corrosive paint two coats over one coat of primary coat including cost of all
materials fabrication, welding transportation to site, all taxex and duties, fixing in position duly embodying in
CC (1:1.5:3) prop., and all other incidental and operational charges etc., complete for finished item of work.

Ladder with Landings arrangement etc


Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material ,
labour charges for fabrication and fixing in postion etc,. Complete.

ISMB 250 x 125 I section beams for Collection well (38.50 Kg / 1 Rmt)
ISMB Gantry Girders for Pump house

1
1

400.00 Kg

400.00 Kg

Data Ws New
S.No.65
66.39

1 Kg

26556.00

1 Kg

71558.00

Data Ws New
S.No.109
x
x

2
1

9.10

0.00
750.00
750.00 Kg

Manufacture, supply and fixing in position of ISI marked electrical insulation matting confirming to IS: 156522006, non skid flatted top and bottom bearing standard size 100% shock proof etc, complete
inside the pump room

60.00 Sqm

95.41
as per
Quotation
2750.00

1 Sqm

Total Rs
Say Rs.

337269598.xlsx - Sump Cum Pump

165000.00
5550078.00
55.50 Lakhs

23

Page 24 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat

Laying of DI K9 Feeder mains from proposed Infiltration Well to ELSR's


Description of Item

S. N.

Total EWE Quantity


100 mm dia DI K9& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe
Total EWE Qty
Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water
bound macadam and stacking of excavated materials for pipe line trench work. as directed by
the departmental officers.
100 mm dia DI K9& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe

Cutting open C.C. road surface including stacking of excavated materials for pipe line trench
work. as directed by the departmental officers.
100 mm dia DI K9& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe
Cutting open water bound macadam road including soiling for pipe line trench work. as directed
by the departmental officers.
100 mm dia DI K& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe

DETAILED & ABSTRACT ESTIMATION


No
L
B
1

1
1
1
1
1

x
x
x
x
x

1
1
1
1
1

0.00
3616.00
0.00
1361.00
0.00
4101.00
9078.00 Rmt

D
0.70
0.80
0.80
0.90
0.90
1.00

Quantity
1.00
1.10
1.20
1.30
1.30
1.40

Rate

Per

Amount

0.00
3182.08
0.00
1592.37
0.00
5741.40
10515.85 Cum
Data WS New
S.No. 1

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

0.00
280.00
0.00
110.00
0.00
310.00
700.00 Rmt

0.70
0.80
0.80
0.90
0.90
1.00

0.00
224.00
0.00
99.00
0.00
310.00
633.00 Sqm

89.44

1 Sqm

56616.00

1 Cum

1357053.00

1 Cum

687303.00

Data WS New
S.No. 2

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

0.00
370.00
0.00
140.00
0.00
420.00
930.00 Rmt

0.70
0.80
0.80
0.90
0.90
1.00

0.15
0.15
0.15
0.15
0.15
1.15

0.00
44.40
0.00
18.90
0.00
483.00
546.30 Cum

2484.08
Data WS New
S.No. 3

1
1
1
1
1
2

x
x
x
x
x
x

1
1
1
1
1
2

0.00
440.00
0.00
170.00
0.00
500.00
1110.00 Rmt

337269598.xlsx Feeder mains

0.70
0.80
0.80
0.90
0.90
1.00

0.10
0.10
0.10
0.10
0.10
1.10

0.00
35.20
0.00
15.30
0.00
2200.00
2250.50 Cum

305.40

24

S. N.

Description of Item

RBR-FNDN-1- (i-B) - In ordinary soils, by Mechanical means


Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical
specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material , dressing of sides and bottom as per Technical Specification 304
MORTH and as directed by the departmental officer including protecting the existing utility
services wherever it is possible during the execution and taking all precautionary measures in
the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in
trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m,
including all incidental and operational charges etc., complete for Pipe Lines by mechanical
means.

Page 25 of 3205

No

Quantity

Rate

Per

Amount

Data WS New
S.No. 5

% of the EWE Quantity


BLD-CSTN-2-5 - (13): Earth work excavation for foundations and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour charges such as
shoring ,sheeting, planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
(not requiring blasting)-Mechanical Means-Upto 3 m depth

% of the EWE Quantity


RBR-FNDN-1- (i-A) In ordinary soils, by Manual means
Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical
specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material , dressing of sides and bottom as per Technical Specification 304
MORTH and as directed by the departmental officer including protecting the existing utility
services wherever it is possible during the execution and taking all precautionary measures in
the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in
trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m,
including all incidental and operational charges etc., complete for Pipe Lines by manual means.

10515.85

70%

7361.10 Cum

99.12

1 Cum

729632.00

1 Cum

63526.00

1 Cum

582200.00

1 Cum

529718.00

1 Rmt

136191.00

Data WS New
S.No. 6

10515.85

5%

525.79 Cum

120.82

Data WS New
S.No. 4

% of the EWE Quantity


RBR-FNDN-1- (iv) - In hard rock blasting prohibited: Excavation in Hard rock (blasting
prohibited) Upto 3 m depth including 1.5 m depth in hard rock : Earthwork excavation in hard
rock such as sheet rock and boulders in habitant areas where conventional blasting can not be
done for pipe line trenches, including all incidental and operational charges etc., complete.

% of the EWE Quantity


PHE-BHLW-26; Barricading, hoarding, lighting and watching etc., for water supply and
sewerage works for trenches of depths upto 6-0 (2 Meter) below G.L

For main roads on Road sides


BLD-CSTN-2-8 (16): Collection ,Supply and filling of Sand from approved quarry to work site
and stacking at work site to Dept. gauge for premeasurements
including cost and
convenyance of all material and all labour charges etc. complete as per standard specifications.
Clause 305.3.9 MORD & 304 MORTH

for Bedding of Pipe line


100 mm dia DI K9& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe

10515.85

20%

2103.17 Cum

276.82

Data WS New
S.No. 7

10515.85

5%

525.79 Cum

1007.47
Data WS New
S.No. 14

908.00

908.00 Rmt

149.99

Data WS New
S.No. 16

1
1
1
1

x
x
x
x

1
1
1
1

0.00
3616.00
0.00
1361.00

337269598.xlsx Feeder mains

0.70
0.80
0.80
0.90

0.15
0.15
0.15
0.15

0.00
433.92
0.00
183.74

25

Description of Item

S. N.

10

11

12

13

300 mm dia DI K9& pipe


350 mm dia DI K9& pipe
for restoration of BT & CC Roads
100 mm dia DI K9& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe

Page 26 of 3205

No

Quantity

1
1

x
x

1
1

0.00
4101.00

0.90
1.00

0.15
1.15

0.00
4716.15

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

0.00
650.00
0.00
250.00
0.00
730.00

0.70
0.80
0.80
0.90
0.90
1.00

0.50
0.50
0.50
0.50
0.50
1.50

0.00
260.00
0.00
112.50
0.00
1095.00
6801.31 Cum

Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket
spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor
classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining
inside the pipes with out side Zinc coating. Rates are including Transportation, ST and all
Govt.levies etc,. but excluding CED.

Rate

1285.16

Per

Amount

1 Cum

8740772.00

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
2 Rmt

0.00
5530872.00
0.00
3879741.00
0.00
9505484.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

0.00
136897.00
0.00
69820.00
0.00
406323.00

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

0.00
159538.00
0.00
117944.00
0.00
576560.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

0.00
78663.00
0.00
37549.00
0.00

DI Pipes

100 mm dia DI K9& pipe


150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe
Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply
and delivery of rubber gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of
material, loading, incidental handling with companys standard packing, transportation,
unloading & stacking, ST and all Govt.levies but excluding CED. etc., complete.for 5.50 m
working length pipes

1
1
1
1
1
1

100 mm dia DI K9& pipe


150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe
PHE-LCIS-1: Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends
carefully into trenches and laying them true to alignment and gradient including all sundries but
excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS
No.3114/1994)

1
1
1
1
1
1

100 mm dia DI K9& pipe


150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe
PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, excluding the cost
of the gasket but including all sundries filling with water with a water lead upto 500 m and
testing to required pressure etc., complete as per BIS No.3114/85.

1
1
1
1
1
1

100 mm dia DI K9& pipe


150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe

1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

0.00
3657.50
0.00
1375.00
0.00
4147.00

0.00 Rmt
3657.50 Rmt
0.00 Rmt
1375.00 Rmt
0.00 Rmt
4147.00 Rmt

1097.16
1512.20
2101.47
2821.63
3647.50
4584.27

DI Pipes

x
x
x
x
x
x

0
665
0
250
0
754

0 Nos
665 Nos
0 Nos
250 Nos
0 Nos
754 Nos

141.60
205.86
250.43
279.28
426.13
538.89

Data WS New
S.No. 42

x
x
x
x
x
x

1
1
1
1
1
1

0.00
3616.00
0.00
1361.00
0.00
4101.00

0.00 Rmt
3616.00 Rmt
0.00 Rmt
1361.00 Rmt
0.00 Rmt
4101.00 Rmt

27.09
44.12
64.14
86.66
112.09
140.59

Data WS New
S.No. 43

x
x
x
x
x

0
657
0
247
0
337269598.xlsx Feeder mains

0 Nos
657 Nos
0 Nos
247 Nos
0 Nos

96.74
119.73
133.16
152.02
174.74

26

Description of Item

S. N.

14

I
a

II
a

III
a

IV
a

350 mm dia DI K9& pipe


Manufacture, supply and delivery of centrifugally cast (spun ) ductile iron fittings conforming to
IS No. 9523/2000 having dimentions as per table. , zinc coated externally with inside mortor
lining (with finishing as per class 13/IS 9523/2000 as per Code No 1 ) including transportation,
taxes and duties etc.
Double socket
branch
flangedia
Tee
Up to 500mm
150 x 150
200 x 150
200 x 200
250 x 150
250 x 200
250 x 250
300x 150
300x 200
300x 250
300 x 300
Flanged Sockets
Up to 500mm dia
250 mm dia
250 mm dia
250 mm dia
250 mm dia
250 mm dia
Flanged Spigots
Up to 500mm dia
250 mm dia
250 mm dia
250 mm dia
250 mm dia
250 mm dia

Page 27 of 3205

No
1

746

Quantity
746 Nos

206.55

Per

Amount

1 Nos

154086.00

Data DI & CI
Spe.

1
1
1
1
1
1
1
1
1
1

1
1
1
1
1

1
1
1
1
1

x
x
x
x
x
x
x
x
x
x

x
x
x
x
x

x
x
x
x
x

14
0
0
10
0
0
0
0
0
0

0
1
0
1
0

0
2
0
2
0

28.00
37.00
44.00
45.00
53.00
63.00
58.00
66.00
76.00
88.00

9.00
14.00
20.00
26.00
35.00

11.00
17.00
26.00
36.00
48.00

392.00
0.00
0.00
450.00
0.00
0.00
0.00
0.00
0.00
0.00
842.00 Kg

151.78

1 Kg

127799.00

0.00
14.00
0.00
26.00
0.00
40.00 Kg

151.78

1 Kg

6071.00

0.00
34.00
0.00
72.00
0.00
106.00 Kg

151.78

1 Kg

16089.00

151.78

1 Kg

192912.00

Double socket bends


Up to 500mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
300 mm dia

1
1
1
1

x
x
x
x

14
0
5
0

17.00
27.00
37.00
52.00

238.00
0.00
185.00
0.00

16

53.00

848.00
1271.00 Kg

15

Rate

Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft
sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/ SG
400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully
rubber lined with EPDM food grade quality
and seals of NBR and the valves should be of
vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS148462000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside
and outside pocket less body passage. Drilled as per IS:1538.
Data- valves-8.A

DI. D/F Sluice valves of PN.10 class


100mm dia Sluice Valves ( including Scrour)

0
337269598.xlsx Feeder mains

0 Nos

19147.19

1 Nos

0.00

27

S. N.

16

Description of Item

Page 28 of 3205

No

Quantity

150mm dia Sluice Valves ( including Scour )


200mm dia Sluice Valves ( including Scour )
250mm dia Sluice Valves
300mm dia Sluice Valves
350mm dia Sluice Valves
PHE-CISV-15 : Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand
wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces

1
1
1
1
1

x
x
x
x
x

1
0
1
0
1

1 Nos
0 Nos
1 Nos
0 Nos
1 Nos

100mm dia Sluice Valves ( including Scrour)


150mm dia Sluice Valves ( including Scour )
200mm dia Sluice Valves ( including Scour )
250mm dia Sluice Valves
300mm dia Sluice Valves
350mm dia Sluice Valves
Manufacturing, supplying, lowering, installation and testing of Ultrasonic Flow meter and ultra
sonic digital level transmiiter, controller, including cost of all other accessoroed such as
additional LED display, datalogger, GSM Modem with connectivity and softwater for PC and
other all labour charges for fixing at site, and other taxes etc., complete

1
1
1
1
1
1

x
x
x
x
x
x

0
1
0
1
0
1

0 Nos
1 Nos
0 Nos
1 Nos
0 Nos
1 Nos

100mm dia
150mm dia
200mm dia
250mm dia
250mm dia
250mm dia
Supply and delivery of Pressure reducing valve type 02 Reduces a higher inlet pressure to a
constant lower outlet pressure, independent of the flow rate or inlet pressure fluctuations.hydraulically operated main valve with pilot valve in control circuit - control range of pressure
reducing pilot valve: 2 up to 12 bar - separate controller for adjustment of opening and closing
speed - including manometers start-up tool and visual position indicator - high capacity filter with
inspection glass and ball valve for manual drain of the filter - face to face lenght: 600 mm flange dimensioned and drilled acc.to EN 1092-2 PN 25 Medium: water Range of temperature:
up to 50C Material main valve: body parts of ductile cast iron EN-JS1030 (GGG-40) - seat and
control device made of stainless steel - valve sealing and diaphragm made of EPDM Material
control circuit and pilot valve: - all functional parts made of stainless steel - rubber parts made of
EPDM high capacity filter made of stainless steel, inspection glass made of pressure-resistant
polypropylene Corrosion protection: inside and outside epoxy coated, colour: blue, RAL 5005

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

150 mm dia
200 mm dia
PHE-JCIF-5-: Jointing CI pipes, fittings and valves with flanged ends including cost of jointing
materials such as bolts, rubber insertion, white lead including filling with water, with lead up to
500 meters and testing to required pressure complete. (Reference to specifications. BIS
No.3114/1994.)

1
1

x
x

1
4

100mm dia Sluice Valves ( including Scrour)


150mm dia Sluice Valves ( including Scour )
200mm dia Sluice Valves ( including Scour )
250mm dia Sluice Valves
300mm dia Sluice Valves

2
2
2
2
2

Rate
30147.18
50097.52
69386.62
104867.72
317505.67

Per

Amount

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

30147.00
0.00
69387.00
0.00
317506.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
2 Nos

223.00
0.00
523.00
0.00
628.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

195355.00
230741.00
256471.00
291722.00
400670.00

1 No
1 No

455667.00
2878920.00

Data- valves-14

17

131.56
222.96
367.84
522.74
744.23
1256.85

Data- valves-17

a
a
b
c

18

150 mm dia
150 mm dia
200 mm dia
250 mm dia
250 mm dia
250 mm dia

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

182675.00
195355.00
230741.00
256471.00
291722.00
400670.00

Quotation

19

1 No
4 No

455667.00
719730.00

Data WS New
S.No. 44

x
x
x
x
x

0
1
0
1
0
337269598.xlsx Feeder mains

0 Nos
2 Nos
0 Nos
2 Nos
0 Nos

306.60
489.92
535.84
777.57
815.66

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

0.00
980.00
0.00
1555.00
0.00

28

Description of Item

S. N.

20

Page 29 of 3205

No

Quantity

350mm dia Sluice Valves


Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile
Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent
revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and
Gaskets and seals of EPDM food grade quality.S
Epoxy powder coating (EP-P) inside and
outside colour blue. Drilled as per IS:1538.

0 Nos

50mm dia Air Valve


80mm dia Air Valve
100mm dia Air Valve
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air
Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc.,
complete.
50mm dia Air Valve
80mm dia Air Valve
100mm dia Air Valve
RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 :
Dismantling of existing structures like culverts, bridges, retaining walls and other structure
comprising of stone masonry, including disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202
MORD / MORTH - Rubble Stone Masonry in Cement Mortar

1
1
1

x
x
x

3
0
2

3 Nos
0 Nos
2 Nos

1
1
1

x
x
x

3
0
2

3 Nos
0 Nos
2 Nos

Rate
1177.61

Per

Amount

2 Nos

0.00

1 Nos
1 Nos
2 Nos

142037.00
0.00
73745.00

1 Nos
1 Nos
2 Nos

769.00
0.00
300.00

Data- valves-7

21

22

47345.70
63163.20
73744.76

Data- valves-16

256.32
274.04
299.94

Data WS New
S.No. 205

23

Existing Drains
Dismantelling & clearing away the CC & carting the excavated material from the site within 5.00
kms distance to a suitable site including loading, unloading, conveyance charges & dumping the
carted materialat at the contractor's cost, including all labour charges, all leads, lifts and other
incidental & operational charges etc.,complete.

5.00

1.00

1.00

90.00 Cum

13

5.00

1.00

0.20

13.00 Cum

Dismantelling & clearing stacking useful materials of the Reinforced concrete (excavated
material) & transporting away the site within 10kms distance to a suitable site including
loading, unloading, conveyance charges & dumping the carted materialat the contractor's cost,
including all labour charges, all leads, lifts and other incidental & operational charges
etc.,complete for SWD roof slabs.

453.21

1 Cum

40789.00

1292.44

1 Cum

16802.00

1 Cum

25171.00

1 Cum

3631209.00

Data WS New
S.No. 212

1
25

18

Data WS New
S.No. 211

1
24

11

5.00

1.00

0.20

11.00 Cum

2288.27

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement
concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm
size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials,
labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to
the required level curing etc., complete for finished item of work.for foundation and under
flooring bed.
Data WS New
S.No. 29

for road restoration


100 mm dia DI K9& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

0.00
650.00
0.00
250.00
0.00
730.00

337269598.xlsx Feeder mains

0.70
0.80
0.80
0.90
0.90
1.00

0.10
0.10
0.10
0.10
0.10
1.10

0.00
52.00
0.00
22.50
0.00
803.00
877.50 Cum

4138.13

29

S. N.

Description of Item

26

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using
20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal
reinforcement

Page 30 of 3205

No

Quantity

Rate

Per

Amount

Data WS New
S.No. 31

27

for Anchor blocks


BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse aggregate ) using
20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal
reinforcement for Road restoration.
for Road restoration
100 mm dia DI K9& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe
Add for Repairs of structures desmanteled during the excavation

28

29

14

1.20

1.20

1.50

30.24 Cum

as per EWE
only
1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

0.00
650.00
0.00
250.00
0.00
730.00

0.70
0.80
0.80
0.90
0.90
1.00

6932.86

1 Cum

209650.00

1 Cum

5883264.00

1 Rmt

92280.00

1 Nos

4924.00

1 Nos

27804.00

1 Cum

49949.00

Data WS New
S.No. 32

0.15
0.15
0.15
0.15
0.15
1.15

0.00
78.00
0.00
33.75
0.00
839.50
19.03
970.28 Cum

Providing temporary water supply house service connections with ISI mark GI pipes and fittings
so as not to disturb the existing water supply connections during earth work excavation for
trenches and during laying of new mains in including cost and conveyance of all materials,
labour charges and with all incidental and operational charges etc., complete.

6063.47

Data WS New
S.No. 26

15mm dia
Supply and fixing of precast RCC chambers having the size of 910mm at bottom and 530mm
at top with tapers along with FRC cover and frame, laying in CC (1:2:4) prop including cost of
material, labour charges, curing, conveyance etc., complete as per standard specifications and
standard drawings..

454.00

454.00 Rmt

For up to 200mm dia Sluice valves


Construction of Valve chambers with Cement Concrete vertical walls and RCC slab fitted
with FRC man hole cover and frame, etc including cost and conveyance of all material, labour
charges, curing etc., complete as per standard specifications and standard drawings..

1 Nos

for 250mm dia to 350 Sluice valves


Carting away the surplus excavated material i.e.Earth and Rubble from the site to a suitable
distance of about 10.00 Km including loading, unloading , conveyance charges and dumping
the carted material at the contractors cost, labour charges, all leads & lifts and other incidental
and operational charges etc., complete.

1 Nos

203.26

data-Chamber

30

4924.00

data-Chamber

a
31

90% of rock Qty

32

PHE-CCIP-23: Cutting C.I./ DI / MS Pipes without water in mains where ever required (.Dia of
pipes in mm.)

27804.00

Data WS New
S.No. 31

946.00
946.00 Cum

52.80
Data WS New
S.No. 213

337269598.xlsx Feeder mains

30

S. N.

33

Description of Item
100 mm dia DI K9& pipe
150 mm dia DI K9& pipe
200 mm dia DI K9& pipe
250 mm dia DI K9& pipe
300 mm dia DI K9& pipe
350 mm dia DI K9& pipe
Manufacture, supply and erection of air valve guard cabins of size 0.90 x 0.90 x 0.90 m made
with 4 numbers vertical and 8 numbers horizontal MS angles of size 75 x 75 x 6mm and 10mm
dia MS square bars fixed at 7.50cm c/c with door and locking arrangements as per approved
drawing and as directed by the departmental officer and painting both sides with anti-corrossive
paint two coats over one coat of primary coat including cost of all material, fabrication, welding,
transportation etc., complete

1
1
1
1
1
1

1
1
1
1
1
1

Quantity
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

3 Nos

Providing and fixing 1.50 m long 16mm dia cold twisted deformed steel Anchor rods with
0.75m length driven in to the hole drilled in bed rock and remaining length embedded in
concrete/ masonry including cost of all materials, machinary, labour, drilling and cleaning hole,
driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all
lifts.
for providing reinforcement to anchor bars over sheet rock, where excavation is not possible

35

x
x
x
x
x
x

Rate
75.80
142.13
189.51
236.89
284.26
331.64

Per

Amount

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
2 Nos

76.00
142.00
190.00
237.00
284.00
166.00

1 Nos

24603.00

1 Nos

34217.00

1 Rmt
1 Rmt

5792659.00
6000000.00

1 Nos
1 Rmt

23357.00
12033.00

Data WS New
S.No. 52

1
34

Page 31 of 3205

No

8201.07

Data WS New
S.No. 49

56

56 Nos

611.01

Railway crossing/road crossing/canal crossing by trenchless technology tunneling work through


specialized pipe jacking method in co-ordination with concerned authorities for as per approved
drawings, installing to correct level gradient and alignment by hydraulic pipe jacking technique
complete including tunneling excavation drive and receive pits, excavation and all machines
transportation charges and other required materials and including cost of encasing pipe
Data WS New
S.No. 47

a
b
36

37

Railway crossing
amount payble to Railways Dept.
Manufacture, supply and delivery of Cast Iron pipes and fittings (spls.) conforming to IS. No.
7181/1986, 5531/1988, 3950/1979 and CID. joints confirming to IS No.8794/1988 at site of work
anywhere in A.P.including, loading, unloading, transportation to site of work stacking at site
transit risk and package, excluding taxes and duties.
for Scouring arrangments - 100mm dia
duck foot bends
Semi circular bends
CI D/F pipes -0.60m
for Scouring arrangments - 150mm dia
duck foot bends
Semi circular bends
CI D/F pipes -0.60m
Shifting and errection of electric poles, telephone poles coming across the proposed alignment
of the pipeline.
Electrical poles
Cables
Total

1
1

x
x

2
2

60.00
60.00

120.00 Rmt
120.00 Rmt

48272.16
50000.00

Data WS New
S.No. 50 & 51

1
1
2

x
x
x

1
1
1

47.00
62.00
38.36

47.00
62.00
76.72

1
1
2

x
x
x

3
3
3

26.00
33.20
23.64

78.00
99.60
141.84

1
1

x
x

5
1

227.00

5 Nos
227.00 Rmt

4671.44
53.01

Rs.

337269598.xlsx Feeder mains

61096511.00

31

Page 32 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat

Construction of 1400 KL RCC ELSR in Zone.IV, Palakonda Nagar Panchayat


S.N.

DESRIPTION OF ITEM

Construction of I No. 1500 KL ELSR of suitable design in a single compartment at -LachapetaZone- I with a staging of 18.00 mts and with dead storage of 0.15 Mts and 0.45 Mts free board
above MWL the Hydraulics of the ELSR are

Nos
1

Measurments
1

QTY
1400 KL

RATE
17.284

PER
1 Liter

AMOUNT
24197320.00

data-ELSR

Average GL :
LWL
:
MWL
:
The minimum thickness for top roof slab shall be 100 mm. The minimum thickness of bottom slab /
bottom dome shall be 200 mm (With reinforcement on both faces) and un cracked section shall
be adopted. All RCC shall be of VRCC M30 grade PCC basement course shall be in (1:3:6) 150
mm thick with 150 mm projection on either side of the footing. Minimum depth of foundation shall
be 2.50 Mts as measured at top of the base course. The SBC shall be adopted as per the report of
soil Investigation agency or the SBC report being done by contractors separately which ever is less
and shall be restricted to a certain value as per the site conditions to be decided by SE / EE, sand
cushion of 0.60 Mts shall be provided below PCC levelling course in case of clayey soils.Raft
foundation shall be provided

Galleries of 0.75 Mts width and hand railing shall be provided both at floor level and roof level.
Braces and ring beams shall be of uniform cross section.Wind forces shall be considered on all
columns. Age factor and redistribution of moments are not allowed. Roof shall also be designed as
un cracked section.
Applying four coats of Anti corrossivel apoxy based coating system to the inner faces of side walls,
roof dome and alround inner columns up to MWL in based coat and 3 top coats out on thoroughly
prepared concrete sub surface Each coat not exceeding 60 microns in dry film thickness total
thickness 240 microns and 2 coats of weather proof emulsion painting for external surfaces
including cost of all labour charges etc., complete for finished item of work.

Testing of the reservoir for water tightness including cost and conveyance of water as per CI 10 of
IS 3370 (Part I) of 1965 and shall satisfy the water tightness requirement as per CI 10, 12 of
3370 / 1965 emptying the service reservoir after testing, cleaning finishing etc., complete levelling
the site including disposal of surplus earth etc. The tentative details of pipe connections are as
follows.

337269598.xlsx 1400KL ELSR

32

Page 33 of 3205

S.N.

DESRIPTION OF ITEM

Nos

Measurments

QTY

RATE

PER

AMOUNT

The reservoir construction shall include fixtures and accessories. Finishing of the ELSR should be
done as per relevant standard specifications. Laying, jointing and testing of CI pipe connections
includes pipes, specials, bell mouths, valves, bends etc., for inlet outlet ,scour and over flow
connections including construction of masonry pits, surface boxes etc., and drainage arrangements
as per relevant standard specifications
The contractor has to fix the CI D/F pipes, specials
valves etc. The pipes shall be cleaned after fixing and provided with 2 coats of anticorrosive black
paint. Supply, delivery and fixing of the following accessories of best quality and as per
specification or any other higher quality.

a) RCC or Aluminum ladder inside 0.60 m wide.


b) spiral staircase on the outside shall be provided upto 200KL. Above 200KL capacity dog legged
staircase shall be provided with staircase flight width of 1.0mts and landing width of 1.20mts with
S.S hand railing upto 1.0 height.
c) Lightening arrestor, including conductor and earthing etc.
d) RCC finial ventilators with copper or stainless steel fly proof mesh.
e) D.I Manholes frame and cover 0.60x0.60 m as per IS specifications (light duty) - 2 Nos.
f) Water level indicator of good quality with ebonite/ copper float approved pattern - 1 No.
g) The ladder shall be with M.S ladder and Verticals with HDPE of 10kg/Sqcm shall be provided for
single column OHSRs only
h) Minimum staging for all ELSR/OHSR shall be 10.0mts.
i) The increase in staging shall be at 1.0mt interval.
j) The railing provided to the gallery and staircase shall be with stainless steel of grade 304 for a
height of 1.20mts
k). The dog legged staircase shall be enclosed with brick/CRS wall on three sides and front side
with M.S collapsible gate upto 1st brace level from ground level to prevent unauthorized entry
l). D.I swan neck ventilators shall be provided in top dome and slab.
m).The above rates are exclusive of all inlet, out let connection and valves. All valves near inlet,
out let and for scour of ELSRs shall be D.I valves.
2

Supply and delivery of CI flanged pipes and specials to site confirming to IS 1538-1993 of standard
/ Non standard including cost and conveyance, packing, farwarding, transit risk etc.complete
including all taxes and duties.

Data DI & CI
Spe.

As per separate sheet enclosed


Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft
sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/ SG
400/12 or equivalent grade as per I.S.3896- part2-1985 and subsequent revisions, wedge fully
rubber lined with EPDM food grade quality and seals of NBR and the valves should be of
vacuum tight and 100% leak proof with face to face dimensions as per BS516389/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both
inside and outside pocket less body passage. Drilled as per IS:1538.

150 mm dia DI D/F Sluice Valve for Scour - PN.1.6


300 mm dia DI D/F Sluice Valve for outlet - PN.1.6

1
1

x
x

1
1

13060.00

Kg

80.53

1 Kg

1051722.00

1 No
1 No

30147.00
104868.00

Data Valves

a
b

337269598.xlsx 1400KL ELSR

1 No
1 No

30147.18
104867.72

33

Page 34 of 3205

S.N.

DESRIPTION OF ITEM

PHE-CISV-15 : Lowering, keeping in position and fixing C.I / DI. sluice valves (with cap / with hand
wheel & Reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces.

Nos

Measurments

QTY

a
b
5

150 mm dia DI D/F Sluice Valve for Scour - PN.1.6


300 mm dia DI D/F Sluice Valve for outlet - PN.1.6
PHE-JCIF-5 : Jointing CI pipes, fittings and valves with flanged ends including cost of jointing
materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500
meters and testing to required pressure complete. (Reference to specifications. BIS
No.3114/1994.)

1
1

x
x

1
1

1 No
1 No

a
b

150 mm dia DI D/F Sluice Valve for Scour - PN.1.6


300 mm dia DI D/F Sluice Valve for outlet - PN.1.6

2
2

x
x

1
1

2 No
2 No

RATE

PER

AMOUNT

Data Valves

222.96
744.23

1 No
1 No

223.00
744.00

1 No
1 No

985.00
1641.00

Data Valves

492.59
820.42

450mm size CC Drain from over flow/ Scour Pipe to existing SW drain
6

BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on bank for all lifts and
with an initial lead of 10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding
dewatering charges etc as per SS - 20 B (APSS 308).

Bld up to 3F
S.No 1

1
7

100.00

1.00

0.90

90.00

Cum

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Sand from approved quarry to work site and
stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all
material and all labour charges etc. complete as per standard specifications. Clause 305.3.9
MORD & 304 MORTH
Below CC Bed
BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level
Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate )
using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and
under flooring bed.

258.06

1 Cum

23225.00

1 Cum

19277.00

1 Cum

39623.00

1 Cum
1 Cum

50782.00
50782.00

10 Sqm

23983.00

Data WS New
S.No.160

100.00

1.00

0.15

15.00

Cum

1285.16

Bld up to 3F
S.No 14

CC Bed
BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level
Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using
20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal
reinforcement

100.00

1.00

0.10

10.00

Cum

3962.28

Data WS New
S.No.160

a
b
10

for Bed of vent portion


for Walls
BLD-CSTN-8-8-(83) : Plastering with 20mm thick in single coat in CM (1:3) finished smooth
including cost and conveyance of all materials to site, seigniorage charges on all materials,
finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting
grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10
Sqm.

1
1

Plastering for Walls and bed

x
x

1
2

100.00
100.00

0.90
0.25

0.10
0.45

9.00
9.00

Cum
Cum

5642.42
5642.42

Data WS New
S.No.36

100.00

337269598.xlsx 1400KL ELSR

1.60

160.00 Sqm

1498.93

34

Page 35 of 3205

S.N.

DESRIPTION OF ITEM

11

BLD-CSTN-3-13-(30)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS
456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials like
cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational, incidental and labour
charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with
minimum cement content as per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but
excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS,
BEAMS

Nos

Measurments

QTY

RATE

PER

AMOUNT

Data WS New
S.No.34

12

Road slabs over drains


BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically
Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different
diameters for RCC works , including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved materials and size and tying
and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved
designs and drawings, including cost and conveyance of steel bars, including all wastages such as
overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, labour charges such as cutting, bending, placing in position,
tying including sales and other taxes on all materials etc., complete for finished item of work in all
floors.( APSS No.126

6.00

0.90

0.225

1.22 Cum

6803.710

1 Cum

8301.00

1 Kg

8958.00

Data WS New
S.No.40

13

Steel for slab @ 100 Kg/Cum


Steel for strengthening of CC walls at culvert porion
Total Steel Qty in Kgs
Carting away the surplus excavated earth from the work site with a lead of 5.0 km beyond initial
lead including loading, unloading and conveyance but excluding stacking charges etc., complete for
roads/drains- 1 cum

100.00

122.00
50.00
172.00 Kg

52.08
Data WS New
S.No.19

50% of the excavated Qty in Cum

45.00 Cum

51.70

1 Cum

Total Rs.
Say

Rs.

2327.00
25614908.00
256.15 Lakhs

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat
Construction of 1400 KL RCC ELSR in Zone.IV, Palakonda Nagar Panchayat
Requirement of CI Pipes and Specials for In let & Out Let arrangements

Description of Item

S.N
A

IN LET
1 250 mm dia CI D/F pipe 2.00Mts.
2 250 mm dia CI D/F pipe 1.00Mts.
3 250 mm dia CI D/F pipe 0.90Mts.
4 250 mm dia CI D/F pipe 0.60Mts.
5 250 mm dia CI D/F Duck Foot Bend.
6 250 mm dia CI D/F Bell Mouth.

Wieght in
Kgs

Nos
1
1
1
1
1
1

x
x
x
x
x
x

13
3
2
2
1
1

187.60
105.80
97.62
73.08
111.00
31.00
A

337269598.xlsx 1400KL ELSR

Total weight
2438.80
317.40
195.24
146.16
111.00
31.00
3239.60 Kgs

35

Page 36 of 3205

S.N.
B

DESRIPTION OF ITEM

Nos

Measurments

QTY

OUTLET
1 250 mm dia CI D/F pipe 2.00Mts.
2 250 mm dia CI D/F pipe 1.00Mts.
3 250 mm dia CI D/F pipe 0.90Mts.
4 250 mm dia CI D/F pipe 0.60Mts.
5 250 mm dia CI D/F Duck Foot Bend.
6 250 mm dia CI D/F Bell Mouth.

1
1
1
1
1
1

x
x
x
x
x
x

13
3
2
2
1
1

187.60
105.80
97.62
73.08
111.00
31.00
B

2438.80
317.40
195.24
146.16
111.00
31.00
3239.60 Kgs

OVER FLOW
1 300 mm dia CI D/F pipe 2.00 Mts.
2 300 mm dia CI D/F pipe 1.00 Mts.
3 300 mm dia CI D/F pipe 0.90 Mts.
4 300 mm dia CI D/F pipe 0.60 Mts.
5 300 mm dia CI D/F Duck Foot Bend.
6 300 mm dia CI D/F Bell Mouth.

1
1
1
1
1
1

x
x
x
x
x
x

13
3
2
2
1
1

241.80
135.70
125.10
93.30
156.00
45.00
C

3143.40
407.10
250.20
186.60
156.00
45.00
4188.30 Kgs

SCOUR
1 200 mm dia CI D/F pipe 2.00Mts.
2 200 mm dia CI D/F pipe 1.00Mts.
3 200 mm dia CI D/F pipe 0.90Mts.
4 200 mm dia CI D/F pipe 0.60Mts.
5 200 mm dia CI D/F Duck Foot Bend.
6 200 mm dia CI D/F Bell Mouth.

1
1
1
1
1
1

x
x
x
x
x
x

13
3
2
2
1
1

138.80
78.70
72.69
54.66
74.00
23.00
D

1804.40
236.10
145.38
109.32
74.00
23.00
2392.20 Kgs
13060.00
13060.00 Kgs

Total weight of the specials ( A+B+C+D )


Say

337269598.xlsx 1400KL ELSR

RATE

PER

AMOUNT

36

Page 37 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat
Laying of Distribution Lines in Palakonda Nagar Panchayat
DETAILED & ABSTRACT ESTIMATION

Description of Item

S.N.

Total EWE Quantity


110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
450 mm dia DI K7 Pipe
500 mm dia DI K7 Pipe
Total EWE Qty
Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water
bound macadam and stacking of excavated materials for pipe line trench work. as directed by
the departmental officers.
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
450 mm dia DI K7 Pipe
500 mm dia DI K7 Pipe

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

L
1
1
1
1
1
1
1
1
1

55445.00
1676.00
570.00
2100.00
605.00
150.00
0.00
0.00
0.00
60546.00 Rmt

D
0.60
0.60
0.80
0.90
0.90
1.00
1.00
1.10
1.10

Quantity
1.10
1.10
1.20
1.30
1.30
1.40
1.50
1.50
1.60

Cutting open water bound macadam road including soiling for pipe line trench work. as directed
by the departmental officers.
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe

Rate

Per

Amount

36593.70
1106.16
547.20
2457.00
707.85
210.00
0.00
0.00
0.00
41621.91 Cum

Data Ws New S.
No.1

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1

4720.00
150.00
50.00
180.00
60.00
20.00
0.00
0.00
0.00
5180.00 Rmt

0.60
0.60
0.80
0.90
0.90
1.00
1.00
1.10
1.10

2832.00
90.00
40.00
162.00
54.00
20.00
0.00
0.00
0.00
3198.00 Cum

Cutting open C.C. road surface including stacking of excavated materials for pipe line trench
work. as directed by the departmental officers.
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
450 mm dia DI K7 Pipe
500 mm dia DI K7 Pipe

No

89.44

1 Cum

286029.00

1 Cum

1656385.00

Data Ws New S.
No.2

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1

6380.00
200.00
70.00
250.00
70.00
20.00
0.00
0.00
0.00
6990.00 Rmt

0.60
0.60
0.80
0.90
0.90
1.00
1.00
1.10
1.10

0.15
0.15
0.15
0.15
0.15
1.15
2.15
3.15
4.15

574.20
18.00
8.40
33.75
9.45
23.00
0.00
0.00
0.00
666.80 Cum

2484.08
Data Ws New S.
No.3

1
1
1
1
1
2
3

x
X
x
x
x
x
x

1
1
1
1
1
2
3

2780.00
90.00
30.00
110.00
30.00
10.00
0.00

Dist-Zone-I-ysr - 337269598.xlsx

0.60
0.60
0.80
0.90
0.90
1.00
1.00

0.15
0.15
0.15
0.15
0.15
1.15
2.15

250.20
8.10
3.60
14.85
4.05
46.00
0.00

37

Page 38 of 3205

Description of Item

S.N.
450 mm dia DI K7 Pipe
500 mm dia DI K7 Pipe
4

No
4
5

x
x

L
4
5

0.00
0.00
3050.00 Rmt

D
1.10
1.10

Quantity
3.15
4.15

0.00
0.00
326.80 Cum

Rate

Per

305.40

Amount

1 Cum

99805.00

1 Cum

2887895.00

1 Cum

251439.00

1 Cum

2304355.00

1 Cum

2096646.00

1 Rmt

456420.00

RBR-FNDN-1- (i-B) - In ordinary soils, by Mechanical means


Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical
specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material , dressing of sides and bottom as per Technical Specification 304
MORTH and as directed by the departmental officer including protecting the existing utility
services wherever it is possible during the execution and taking all precautionary measures in
the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in
trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m,
including all incidental and operational charges etc., complete for Pipe Lines by mechanical
means.
Data Ws New S.
No.5

% of the EWE Quantity


BLD-CSTN-2-5 - (13) : Earth work excavation for foundations and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour charges such as
shoring ,sheeting, planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary rock
(not requiring blasting)-Mechanical Means-Upto 3 m depth

% of the EWE Quantity


RBR-FNDN-1- (i-A) In ordinary soils, by Manual means: Earthwork excavation in all kinds of soil
for Pipe line trenches as per drawings and technical specifications including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material ,
dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by
the departmental officer including protecting the existing utility services wherever it is possible
during the execution and taking all precautionary measures in the restricted areas for laying
sewer/water lines including divertion of traffic and backfilling in trenches with excavated
suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental
and operational charges etc., complete for Pipe Lines by manual means.

41621.91

70%

29135.34 Cum

99.12

Data Ws New S.
No.6

41621.91

5%

2081.10 Cum

120.82

Data Ws New S.
No.4

% of the EWE Quantity


RBR-FNDN-1- (iv) - In hard rock blasting prohibited: Excavation in Hard rock (blasting
prohibited) Upto 3 m depth including 1.5 m depth in hard rock : Earthwork excavation in hard
rock such as sheet rock and boulders in habitant areas where conventional blasting can not be
done for pipe line trenches, including all incidental and operational charges etc., complete.

41621.91

20%

8324.38 Cum

276.82

Data Ws New S.
No.7

% of the EWE Quantity


PHE-BHLW-26: Barricading, hoarding, lighting and watching etc., for water supply and
sewerage works for trenches of depths upto 6-0 (2 Meter) below G.L

on main roads
BLD-CSTN-2-8 (16): Collection ,Supply and filling of Sand from approved quarry to work site
and stacking at work site to Dept. gauge for premeasurements
including cost and
convenyance of all material and all labour charges etc. complete as per standard
specifications. Clause 305.3.9 MORD & 304 MORTH

41621.91

5%

2081.10 Cum

1007.47
Data Ws New S.
No.14

3043.00

3043.00 Rmt

149.99

Data Ws New S.
No.16

for Bedding of Pipe line


Dist-Zone-I-ysr - 337269598.xlsx

38

Page 39 of 3205

Description of Item

S.N.
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
450 mm dia DI K7 Pipe
500 mm dia DI K7 Pipe
10

11

12

13

No
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

L
1
1
1
1
1
1
1
1
1

8317.00
251.00
86.00
315.00
91.00
23.00
0.00
0.00
0.00

D
0.60
0.60
0.80
0.90
0.90
1.00
1.00
1.10
1.10

Quantity
0.10
0.10
0.10
0.10
0.10
1.10
2.10
3.10
4.10

499.02
15.06
6.88
28.35
8.19
25.30
0.00
0.00
0.00
582.80 Cum

Manufacture, supply, delivery of HDPE pipes conforming to IS 4984 - 1995 including


transportation to any where in AP , Excise duty, sales tax etc., complete ( Supply upto 90mm
dia in coil & above 90mm dia strightin length in 6M) (6 Kg/Sq Cm)
1
1

110 mm dia HDPE 6Kg/Cm2 pipe


160 mm dia HDPE 6Kg/Cm2 pipe
Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including
transportation to any where in A.P, Central excise duty, sale tax etc., complete

1
1

100mm dia DI K7 pipe for Road & Canal crossings


150mm dia DI K7 pipe for Road & Canal crossings
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350mm dia DI K7 pipe
400mm dia DI K7 pipe
450mm dia DI K7 pipe

1285.16

Per

Amount

1 Cum

748991.00

1 Rmt
1 Rmt

20069000.00
1250499.00

1 Rmt
1 Rmt

4300800.00
176510.00

Data HDPE & PVC


Pipes

110 mm dia HDPE 6Kg/Cm2 pipe


160 mm dia HDPE 6Kg/Cm2 pipe
Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment and gradiant to
hydraulic field test pressure per IS code including cost of water with minimum water lead of
500m (Labour charges only) Outer dia of pipes in mm.

Bends for
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
End caps for
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
Long neck pipe ends for
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
MS flanges to suit HDPE pipes for
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
Tees for
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket
spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor
classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar
lining inside the pipes with out side Zinc coating. Rates are including Transportation and ST
but excluding CED.etc, complete.

Rate

x
x

1
1

56000.00
1665.50

56000.00 Rmt
1665.50 Rmt

358.38
750.83
Data HDPE & PVC
Pipes

x
x

1
1

56000.00
1665.50

56000.00 Rmt
1665.50 Rmt

76.80
105.98
Data HDPE & PVC
Pipes

1
1

x
x

280
7

280 Nos
7 Nos

550.68
1596.98

1 Nos
1 Nos

154190.00
11179.00

1
1

x
x

56
2

56 Nos
2 Nos

159.96
394.66

1 Nos
1 Nos

8958.00
789.00

1
1

x
x

112
3

112 Nos
3 Nos

281.90
713.27

1 Nos
1 Nos

31573.00
2140.00

1
1

x
x

370
10

370 Nos
10 Nos

255.68
499.55

1 Nos
1 Nos

94602.00
4996.00

1
1

x
x

124
4

124 Nos
4 Nos

537.57
1919.52

1 Nos
1 Nos

66659.00
7678.00

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
2 Rmt
3 Rmt
4 Rmt

917226.00
41586.00
1197838.00
5925423.00
2206738.00
352989.00
0.00
0.00

Data DI & MS
Pipes

1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1

836.00
27.50
570.00
2100.00
605.00
154.00
0.00
0.00

Dist-Zone-I-ysr - 337269598.xlsx

836.00 Rmt
27.50 Rmt
570.00 Rmt
2100.00 Rmt
605.00 Rmt
154.00 Rmt
0.00 Rmt
0.00 Rmt

1097.16
1512.20
2101.47
2821.63
3647.50
4584.27
5560.29
6708.96

39

Page 40 of 3205

Description of Item

S.N.
14

500mm dia DI K7 pipe


Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply
and delivery of rubber gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of
material, loading, incidental handling with companys standard packing, transportation,
unloading & stacking, but excluding CED etc., complete.for 5.50 m working length pipes

No
1

L
1

B
0.00

Quantity
0.00 Rmt

Rate
8009.36

Per

Amount

5 Rmt

0.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
2 Nos
3 Nos
4 Nos
5 Nos

21523.00
1029.00
26045.00
106685.00
46874.00
7544.00
0.00
0.00
0.00

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
2 Rmt
3 Rmt
4 Rmt
5 Rmt

22647.00
1213.00
36560.00
181986.00
67814.00
10825.00
0.00
0.00
0.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
2 Nos
3 Nos
4 Nos
5 Nos

14704.00
599.00
13849.00
58072.00
19221.00
2892.00
0.00
0.00
0.00

Data DI & MS
Pipes

15

16

100mm dia DI K7 pipe for Road & Canal crossings


150mm dia DI K7 pipe for Road & Canal crossings
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350mm dia DI K7 pipe
400mm dia DI K7 pipe
450mm dia DI K7 pipe
500mm dia DI K7 pipe
PHE-LCIS-1: Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends
carefully into trenches and laying them true to alignment and gradient including all sundries but
excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS
No.3114/1994)

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

152
5
104
382
110
28
0
0
0

100mm dia DI K7 pipe for Road & Canal crossings


150mm dia DI K7 pipe for Road & Canal crossings
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350mm dia DI K7 pipe
400mm dia DI K7 pipe
450mm dia DI K7 pipe
500mm dia DI K7 pipe
PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, excluding the
cost of the gasket but including all sundries filling with water with a water lead upto 500 m and
testing to required pressure etc., complete as per BIS No.3114/85.

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1

100mm dia DI K7 pipe for Road & Canal crossings


150mm dia DI K7 pipe for Road & Canal crossings
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350mm dia DI K7 pipe
400mm dia DI K7 pipe
450mm dia DI K7 pipe
500mm dia DI K7 pipe
Manufacture, supply and delivery of centrifugally cast (spun ) ductile iron fittings conforming to
IS No. 9523/2000 having dimentions as per table. , zinc coated externally with inside mortor
lining (with finishing as per class 13/IS 9523/2000 as per Code No 1 ) including transportation,
taxes and duties etc.

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

152
5
104
382
110
28
0
0
0

152 Nos
5 Nos
104 Nos
382 Nos
110 Nos
28 Nos
0 Nos
0 Nos
0 Nos

141.60
205.86
250.43
279.28
426.13
538.89
588.71
633.29
878.47

Data Lowering

836.00
27.50
570.00
2100.00
605.00
154.00
0.00
0.00
0.00

836.00 Rmt
27.50 Rmt
570.00 Rmt
2100.00 Rmt
605.00 Rmt
154.00 Rmt
0.00 Rmt
0.00 Rmt
0.00 Rmt

27.09
44.12
64.14
86.66
112.09
140.59
171.58
207.56
241.96

Data Lowering

17

I
a

Double socket
branch
flangedia
Tee
Up to 500mm
200x200
250x 250
300x 200
300x 250
300 x 300
350 x 100

152 Nos
5 Nos
104 Nos
382 Nos
110 Nos
28 Nos
0 Nos
0 Nos
0 Nos

96.74
119.73
133.16
152.02
174.74
206.55
205.52
234.90
256.30

Data DI & CI Spe

1
1
1
1
1
1

X
X
X
X
X
X

3
11
1
3
2
1

44.00
63.00
66.00
76.00
88.00
57.00

Dist-Zone-I-ysr - 337269598.xlsx

132.00
693.00
66.00
228.00
176.00
57.00

40

Page 41 of 3205

Description of Item

S.N.
350 x 150
350 x 200
350 x 250
II
a

III
a

IV
a

V
a

18

Double socket concentric tapers


Up to 500 x 450mm dia
250x200
300 x 250
Flanged Sockets
Up to 500mm dia
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
Flanged Spigots
Up to 500mm dia
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
Double socket bends
Up to 500mm dia
200 mm dia
250 mm dia
300 mm dia

No
1
1
1

1
1

1
1
1
1
1

1
1
1
1
1

1
1
1

X
X
X

X
X

x
x
X
X
X

x
x
X
X
X

X
X
X

L
0
0
0

7
7

185
5
2
6
2

370
10
4
12
4

4
14
4

B
60.00
69.00
78.00

27.00
35.00

9.00
14.00
20.00
26.00
35.00

9.00
14.00
26.00
36.00
48.00

27.00
37.00
52.00

Quantity

Rate

Per

Amount

0.00
0.00
0.00
1295.00 Kg

151.78

1 Kg

196555.00

189.00
245.00
434.00 Kg

151.78

1 Kg

65873.00

1665.00
70.00
40.00
156.00
70.00
266.00 Kg

151.78

1 Kg

40373.00

3330.00
140.00
104.00
432.00
192.00
728.00 Kg

151.78

1 Kg

110496.00

108.00
518.00
208.00
834.00 Kg

151.78

1 Kg

126585.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
2 Nos
3 Nos
4 Nos
5 Nos

3542230.00
150736.00
100195.00
416320.00
209735.00
158753.00
0.00
0.00
0.00

1 Nos
1 Nos

24339.00
1115.00

Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft
sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/ SG
400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully
rubber lined with EPDM food grade quality
and seals of NBR and the valves should be of
vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS148462000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside
and outside pocket less body passage. Drilled as per IS:1538.

Valves S.No-8

19

DI D/F Sluice valves of PN.10 class


100mm dia Sluice Valves
150mm dia Sluice Valves
200mm dia Sluice Valves
250mm dia Sluice Valves
300mm dia Sluice Valves
350mm dia Sluice Valves
400mm dia Sluice Valves
450mm dia Sluice Valves
500mm dia Sluice Valves
PHE-CISV-15 : Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand
wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces

1
1
1
1
1
1
1
1
1

X
X
X
X
X
X
X
X
X

185
5
2
6
2
1
0
0
0

185 Nos
5 Nos
2 Nos
6 Nos
2 Nos
1 Nos
0 Nos
0 Nos
0 Nos

1
1

X
X

185
5

185 Nos
5 Nos

19147.19
30147.18
50097.52
69386.62
104867.72
317505.67
333014.49
572926.34
608410.39

Valves S.No-14

100mm dia Sluice Valves


150mm dia Sluice Valves

Dist-Zone-I-ysr - 337269598.xlsx

131.56
222.96

41

Page 42 of 3205

Description of Item

S.N.

20

No

200mm dia Sluice Valves


250mm dia Sluice Valves
300mm dia Sluice Valves
350mm dia Sluice Valves
400mm dia Sluice Valves
450mm dia Sluice Valves
500mm dia Sluice Valves
PHE-JCIF-5-: Jointing CI pipes, fittings and valves with flanged ends including cost of jointing
materials such as bolts, rubber insertion, white lead including filling with water, with lead up to
500 meters and testing to required pressure complete. (Reference to specifications. BIS
No.3114/1994.)

1
1
1
1
1
1
1

X
X
X
X
X
X
X

2
6
2
1
0
0
0

100mm dia Sluice Valves


150mm dia Sluice Valves
200mm dia Sluice Valves
250mm dia Sluice Valves
300mm dia Sluice Valves
350mm dia Sluice Valves
400mm dia Sluice Valves
450mm dia Sluice Valves
500mm dia Sluice Valves
BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement concrete
nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite
Machine Crushed Graded Metal including cost and conveyance of all materials like cement,
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement

2
2
2
2
2
2
2
2
2

X
X
X
X
X
X
X
X
X

185
5
2
6
2
1
0
0
0

Quantity
2 Nos
6 Nos
2 Nos
1 Nos
0 Nos
0 Nos
0 Nos

Rate
367.84
522.74
744.23
1256.85
1543.14
2017.95
2339.14

Per

Amount

1 Nos
1 Nos
1 Nos
2 Nos
3 Nos
4 Nos
5 Nos

736.00
3136.00
1488.00
628.00
0.00
0.00
0.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
2 Nos
3 Nos
4 Nos
5 Nos

114071.00
4926.00
2156.00
9383.00
3282.00
1184.00
0.00
0.00
0.00

Valves S.No-15

21

370 Nos
10 Nos
4 Nos
12 Nos
4 Nos
2 Nos
0 Nos
0 Nos
0 Nos

308.30
492.59
538.99
781.89
820.42
1183.95
1888.73
2203.03
2557.39

Data Ws New
S.No.69

for Anchor blocks

22

Providing Reconnections to existing water supply house service connections with ISI mark GI
pipes and fittings so as not to disturb the existing water supply during earth work excavation for
trenches and during laying of new mains including cost and conveyance of all materials, labour
charges and with all incidental and operational charges etc., complete.

101

1.20

1.20

1.50

218.16
218.16 Cum

5642.42

1 Cum

1230950.00

1 Rmt

615268.00

1 Nos

945408.00

1 Nos

222432.00

Data Ws New S.
No.26

23

24

25

15mm dia
Supply and fixing of precast RCC chambers having the size of 910mm at bottom and 530mm
at top with tapers along with FRC cover and frame, laying in CC (1:2:4) prop including cost of
material, labour charges, curing, conveyance etc., complete as per standard specifications and
standard drawings..

For up to 200mm dia Sluice valves and for revamping pipe lines
Construction of Valve chambers with Cement Concrete vertical walls and RCC slab fitted
with FRC man hole cover and frame, etc including cost and conveyance of all material, labour
charges, curing etc., complete as per standard specifications and standard drawings..

for 250mm dia to 350 Sluice valves


Carting away the surplus excavated material i.e.Earth and Rubble from the site to a suitable
distance of about 10.00 Km including loading, unloading , conveyance charges and dumping
the carted material at the contractors cost, labour charges, all leads & lifts and other incidental
and operational charges etc., complete.

3027.00

3027.00 Rmt

203.26

Data Chambers

192

192 Nos

4924.00
Data Chambers

8 Nos

27804.00

Data Ws New
S.No.19
Dist-Zone-I-ysr - 337269598.xlsx

42

Page 43 of 3205

S.N.

Description of Item

a
26

90% of rock Qty


Bailing of water - Dewatering pipe line trenches etc, duly bailing out water from the pipe line
trenches with oil engine driven pumpsets, including hire charges, fuel charges and wages for
Driver and Helper and all other incidental and operational charges including suction and
delivery hose, lead of drain in to natural drain etc, complete.
Assuming ---- days requiring for dewatering in full rainy season and requiring 5 HP Pump sets
at 8 places for 8 hours pumping per day.

27

28

No

Quantity
3746.00 Cum

days

Places

HP

Hours

8.00

for Scouring arrangments - 100mm dia


duck foot bends
Semi circular bends
CI D/F pipes -0.60m
for Scouring arrangments - 150mm dia
duck foot bends
Semi circular bends
CI D/F pipes -0.60m
add for short Pipes & Bends, Specials, etc as per site condition.

Per
52.80

1 Cum

Amount
197789.00

Data Ws New S.
No.20

160.00 Hp.hr

PHE-CCIP-23: Cutting C.I./ DI / MS Pipes without water in mains where ever required (.Dia of
pipes in mm.)
100mm dia DI K7 pipe for Road & Canal crossings
150mm dia DI K7 pipe for Road & Canal crossings
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
Manufacture, supply and delivery of Cast Iron pipes and fittings (spls.) conforming to IS. No.
7181/1986, 5531/1988, 3950/1979 and CID. joints confirming to IS No.8794/1988 at site of
work anywhere in A.P.including, loading, unloading, transportation to site of work stacking at
site transit risk and package, excluding taxes and duties.

Rate

60.22

1 Hp.hr

9635.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

379.00
142.00
569.00
2606.00
1137.00

1 Kgs

100011.00

Data Ws New S.
No.46

1
1
1
1
1

X
X
X
X
X

5
1
3
11
4

5 Nos
1 Nos
3 Nos
11 Nos
4 Nos

75.80
142.13
189.51
236.89
284.26

DI&CI Spe

1
1
2

x
x
x

11
11
11

26.00
33.20
23.64

1
1
2

x
x
x

1
1
1

47.00
62.00
38.36

286.00
365.20
520.08
47.00
62.00
76.72
0.00
1357.00 Kgs

73.70

Restoration of Roads
29

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Sand from approved quarry to work site
and stacking at work site to Dept. gauge for premeasurements
including cost and
convenyance of all material and all labour charges etc. complete as per standard
specifications. Clause 305.3.9 MORD & 304 MORTH
for restoration of Roads in Trench portion
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
450 mm dia DI K7 Pipe
500 mm dia DI K7 Pipe

Data Ws New S.
No.16

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1

13880.00
440.00
150.00
540.00
160.00
50.00
0.00
0.00
0.00

Dist-Zone-I-ysr - 337269598.xlsx

0.60
0.60
0.80
0.90
0.90
1.00
1.00
1.10
1.10

0.225
0.225
0.225
0.225
0.225
0.225
0.225
0.225
0.225

1873.80
59.40
27.00
109.35
32.40
11.25
0.00
0.00
0.00
2113.20 Cum

1285.16

1 Cum

2715800.00

43

Page 44 of 3205

S.N.

Description of Item

30

RBR-SBBS-9 - II(-WBM -Grading - II ) : Providing, laying, spreading and compacting stone


aggregates of specific sizes to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper
grade and camber, applying and brooming, stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and compacting to the required density grading 2 as
per Technical Specification Clause 405 MORD / 404 MORTH. For compacted thickness of 75
mm.
for restoration of WBM Roads
110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
450 mm dia DI K7 Pipe
500 mm dia DI K7 Pipe

31

No

Quantity

Rate

Per

Amount

Data EWE &


Roads

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1

2780.00
90.00
30.00
110.00
30.00
10.00
0.00
0.00
0.00

0.60
0.60
0.80
0.90
0.90
1.00
1.00
1.10
1.10

0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075

125.10
4.05
1.80
7.43
2.03
0.75
0.00
0.00
0.00
141.16 Cum

2710.23

1 Cum

382576.00

1 Cum

3273261.00

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement
concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm
size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials,
labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to
the required level curing etc., complete for finished item of work.for foundation and under
flooring bed.
Data Ws New S.
No.29

for restoration of BT and CC roads


110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
450 mm dia DI K7 Pipe
500 mm dia DI K7 Pipe
32

1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1

11100.00
350.00
120.00
430.00
130.00
40.00
0.00
0.00
0.00

0.60
0.60
0.80
0.90
0.90
1.00
1.00
1.10
1.10

0.10
0.10
0.10
0.10
0.10
1.10
2.10
3.10
4.10

666.00
21.00
9.60
38.70
11.70
44.00
0.00
0.00
0.00
791.00 Cum

4138.13

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete


nominal mix M-30 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite
Machine Crushed Graded Metal including cost and conveyance of all materials like cement,
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work for Road restoration.
Data Ws New S.
No.32

for restoration of BT and CC roads


110 mm dia HDPE 6Kg/Cm2 pipe
160 mm dia HDPE 6Kg/Cm2 pipe
200 mm dia DI K7 Pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe

1
1
1
1
1
1
1

x
x
x
x
x
x
x

1
1
1
1
1
1
1

11100.00
350.00
120.00
430.00
130.00
40.00
0.00

Dist-Zone-I-ysr - 337269598.xlsx

0.60
0.60
0.80
0.90
0.90
1.00
1.00

0.15
0.15
0.15
0.15
0.15
1.15
2.15

999.00
31.50
14.40
58.05
17.55
46.00
0.00

44

Page 45 of 3205

Description of Item

S.N.

No

450 mm dia DI K7 Pipe


500 mm dia DI K7 Pipe
33

34

1
1

x
x

L
1
1

B
0.00
0.00

D
1.10
1.10

Quantity
3.15
4.15

0.00
0.00
1166.50 Cum

Shifting and errection of electric poles, telephone poles coming across the proposed alignment
of the pipeline including cost and conveyance of all material and all labour charges etc,.
Complete.

Rate

Per

6063.47

Amount

1 Cum

7073038.00

1 Nos

140143.00

Data Ws New S.
No.50

Electrical poles
Shifting of under ground cables coming across the proposed alignment of the pipeline including
Earth work excavation, shifting of cables and backfilling etc, complete.

Cables

30

30 Nos

4671.44
Data Ws New S.
No.51

1514.00

1514.00 Rmt

53.01

1 Rmt

Total

80257.00
Rs.

Say

Dist-Zone-I-ysr - 337269598.xlsx

Rs.

71084367.00
710.84 Lakhs

45

Page 46 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat

Construction of Compound Wall around the Proposed Structures


DETAILED & ABSTRACT ESTIMATION
S.N.
1

Description

MEASUREMENTS

Nos.

Quantity

Per

Rate

Amount

Compound Wall
Compound Wall around the Proposed Solar unit
Construction of Compound Wall around Zone - IV ELSR and proposed structures

1
1

x
x

1
1

Total Length of Compound wall


for gate Pillars
Deduction for gate pillars

2
-2

x
x

3
3

410.00
160.00
570.00
0.60
0.60

0.75
0.60
0.60

0.75
0.75
0.75

320.63
1.62
-1.62
320.63 Cum

BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and
with an initial lead of 10m including all operational, incidental, labour charges such as shoring
,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage
excluding dewatering charges etc as per SS - 20 B (APSS 308).
Bld up to 3F
S.No 1

% of Total Qty
BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour charges such as
shoring ,sheeting, planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

80%

257.00 Cum

258.06

1 Cum

66321.00

1 Cum

65486.00

1 Cum

169387.00

1 Cum

750890.00

Data WS New
S.No.7

% of Total Qty
BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level
Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate )
using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and
under flooring bed.

20%

65.00 Cum

1007.47

Data WS New
S.No.28

for Compound Wall


for gate Pillars
Deduction for gate pillars
4

1
2
-2

x
x
x

1
3
3

570.00
0.60
0.60

0.75
0.60
0.60

0.10
0.15
0.10

42.75
0.32
-0.22
42.85 Cum

3962.28

BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard


granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite
Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to
required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing
etc., complete for finished item of Work .
Bld up to 3F
S.No 32

For Foundations below GL


for Compound Wall
for gate Pillars
Deduction for gate pillars

1
2
-2

x
x
x

1
3
3

570.00
0.45
0.45

337269598.xlsx-Compound Walls

0.60
0.45
0.45

0.60
0.60
0.60

205.20
0.73
-0.73
205.20 Cum

3659.31

46

Page 47 of 3205

S.N.

Description

BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop
using hard granite stone including cost & Conveyance of all materials like Cement, Sand ,
Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding
Charges curing etc., complete for finished item of Work .
for Compound Wall excluding gate and gate pillars
for gate Pillars

Quantity

Per

Rate

Amount

Bld up to 3F
S.No 30

1
2

x
x

1
3

566.70
0.30
Net Qty

0.45
0.30

0.60
2.70

153.01
1.46
154.47 Cum

BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7
Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand,
Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour
charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc.,
complete for finished item of work
for Compound Wall excluding gate and gate pillars
for Brick Pillars at every 3.00m c/c
Deduction for Brick Pillars

MEASUREMENTS

Nos.

4197.87

1 Cum

648445.00

1 Cum

701239.00

1 Cum

218136.00

10 Sqm

5578.00

10 Sqm

89628.00

Data WS New
S.No.110

1
1
-1

x
x
x

1
199
199

566.70
0.35
0.23
Net Qty

0.23
0.35
0.35

1.20
0.80
1.20

156.41
19.50
-19.22
156.69 Cum

4475.33

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using
20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal
reinforcement
Data WS New
S.No.160

Over CRS Walls, Brick Wall and Brick Pillars


over CRS wall
over Compound wall
for Pillars
8

x
x
x

1
1
199

566.70
566.70
0.35

0.45
0.23
0.35

0.075
0.075
0.40

19.13
9.78
9.75
38.66 Cum

BLD-CSTN-7-3-(74): Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3 )


Prop . for including cost & conveyance of all materials to site , seignaiorage charges on all
materials, labour charges on all materials, curing etc., Complete for finished item of work
Both sides of CRS walls
for Gate pillars ( 4 sides )

1
1
1

5642.42

Bld up to 3F
S.No 34

1
2

x
x

2
3

566.70
1.20

0.60
2.70

680.04
19.44
699.48 Sqm

82.03

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:4) finished smooth including
cost and conveyance of all materials to site, seigniorage charges on all materials, finishing,
curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
Data WS New
S.No.35

Both sides of Compound wall ( including DPC )


for exposed faces of the Brick pillars
Add for repairs of existing compound wall & other walls

1
4

x
x

2
199

566.70
0.06

337269598.xlsx-Compound Walls

1.35
1.35

1530.09
64.48
100.00
1694.57 Sqm

1281.35

47

Page 48 of 3205

S.N.

Description

10

BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance
charges of materials

11

12

MEASUREMENTS

Nos.

Quantity

Per

Rate

Amount

Data WS New
S.No.38

Qty as per Plastering area


BLD-CSTN-11-8-(164) : Colour washing two coats with approved Colour and quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance
charges of materials

1694.57 Sqm

Qty as per Raised Pointing


Fixing MS angular sections of 1.20m length of size 50mm x 50mm x 6mm confirming to IS 226
and IS 808 as directed by the departmental officers including placing in position in the concrete
for the purpose of fixing barbed wire fencing and painting the angles with two coats of Synthetic
anamel painting including cost and conveyance of all materials, labour charges etc., complete at
the top of the compound wall after raising the wall

699.48 Sqm

340.49

10 Sqm

52098.00

10 Sqm

86548.00

1 Rmt

70097.00

1 Rmt

115697.00

1 Nos

33916.00

1 Kg

47360.00

Bld up to 3F
S.No 59

510.74

Bld up to 3F
S.No 77

13

on Brick Pillars at 3m c/c, 0.4m embedded in CC and 0.8m above wall


BLD-CSTN-15-7(307) : Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I)
weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails,
straining bolts, including securing with and provision of galvanised mild steel wire, stapples or
steel pins, etc., as directed (Posts and struts of wood, concrete, steel, etc.) and straining bolts
shall be paid for separately).

1.2

238.80 Rmt

566.70

3.20

9067.20 Rmt

Providing and fixing 1.50 m long cold twisted deformed steel Anchor rods with 0.75m length
driven in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry
including cost of all materials, machinary, labour, drilling and cleaning hole, driving Anchore rod,
grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.
for providing reinforcement to anchor bars over sheet rock, where excavation is not possible

15

199

293.54

Bld up to 3F
S.No 76

1
14

12.76

Bld up to 3F
S.No 75

92

92 Nos

368.65

Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos
35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m
height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4
Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to
original surface neatly and painting gate with one coat of red oxide primer including cost and
conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending,
welding including all operational charges and all labour charges etc., complete for finished item
of work.
Bld up to 3F
S.No 86

2 Wings of 75.00 Kg Each


for Wicket gate
MS Grills for drain out water- 2 Nos for compound wall @ 15 Kg/each

2
2
2
1

x
x
x
x

2
1
8
1

75.00 Kg
50.00 Kg
15.00

337269598.xlsx-Compound Walls

300.00
100.00
240.00
640.00 Kg

74.00

48

Page 49 of 3205

S.N.

Description

16

Supply and fixing of Display/Name boards of required size where ever necessary made of MS
sheet fixed on MS angles of size 25x25x5mm and the board shall be painted with cannary
yellow in Two coats over a primary coat and all remaining exposed surface shall be painted
black, the letters, boarders and arrows will be painted with Luminous paint and the size of the
letter shall be minimum 15 Cm high and 19mm to 25mm wide and the board shall be fitted to
50x50x10 MS angle posts and firmly fixed in ground in CC(1:3:6) using 40mm size metal in a
block of size 30 x 30 x 90 Cm etc as directed by the Engineer in charge etc.complete.

MEASUREMENTS

Nos.

Quantity

Per

Rate

Name Boards of Size 1.60m x 1.00m

4 Nos

as per
Quotation
7500.00

Name Boards of Size 1.20m x 0.90m


Total Rs.

4 Nos

5000.00

337269598.xlsx-Compound Walls

Amount

1 Nos

30000.00

1 Nos
Rs.

20000.00
3170826.00

Say Rs.

31.71 Lakhs

49

Page 50 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat
CONSTRUCTION OF WATCHMAN QUARTER AT ELSR
DETAILED AND ABSTRACT ESTIMATE
S.N.

Description of Item

Nos

EWE for footings : A1,B1,C1,A2,B2,C2,C3,A4 & B4


for Stair case

1
1

RBR-FNDN-1 -manual means :


Earthwork excavation for structures in all types of soil as per drawing and technical specifications
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,

x
x

L
9
1

B
1.60
1.20

D
1.60
1.20

Qty
1.80
1.80

41.47
2.59
44.06

Rate

Per

Amount

Cum

Bld up to 3F S.No
7

in all types of soils for footings


BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS
308).

90 %

in Hard rocky soils


Earth work excavation for fundations of Walls
Round the building
Building short walls B1 to B4
A2 to C2
Wall between Kitchen and Toilet
Wash area Long wall
Toilet short wall

10 %

39.65 Cum

158.81

1 Cum

6297.00

1 Cum

4443.00

1 Cum

5783.00

1 Cum

2337.00

Data WS New
S.No.7

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

32.58
6.93
7.96
4.00
2.70
1.50

4.41 Cum
0.60
0.60
0.60
0.45
0.45
0.45

0.75
0.75
0.75
0.50
0.50
0.50

1007.47

14.66
3.12
3.58
0.90
0.61
0.34
23.21 Cum

BLD-CSTN-2-1 (9) - Ordinary Soil-Manual Means-Upto 3 m depth


Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of
10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting,
etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per
SS - 20 B (APSS 308).

Data WS New
S.No.4

in all types of soils


BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS
308).

90 %

in Hard rocky soils

10 %

20.89 Cum

276.82

Data WS New
S.No.7

W.man.Qrt-ysr -337269598.xlsx

2.32 Cum

1007.47

50

Page 51 of 3205

S.N.

Description of Item

BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring bed.

Nos

Qty

Rate

Per

Amount

Data WS New
S.No.28

For Footings
for footings : A1,B1,C1,A2,B2,C2,C3,A4 & B4
Stair case Columns
Foundations
Round the building
Building short walls B1 to B4
A2 to C2
Wall between Kitchen and Toilet
Wash area Long wall
Toilet short wall
Deduction for Columns

for Flooring Bed


Hall
Bed Room
Kitchen
Store
Passage
Toilet

1
1

x
x

9
1

1.60
1.20

1.60
1.20

0.15
0.15

3.46
0.22

1
1
1
1
1
1
-1

x
x
x
x
x
x
x

1
1
1
1
1
1
9

32.58
6.93
7.96
4.00
2.70
1.50
0.23

0.60
0.60
0.60
0.45
0.45
0.45
0.00

0.10
0.10
0.10
0.10
0.10
0.10
0.10

1.95
0.42
0.48
0.18
0.12
0.07
0.00
6.90 Cum

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

3.66
3.96
2.75
1.10
1.20
2.75

6.70
3.66
2.75
2.75
1.50
1.46

0.100
0.100
0.100
0.100
0.100
0.100

2.45
1.45
0.76
0.30
0.18
0.40
5.54 Cum
12.44 Cum

Total a + b
6

BLD-CSTN-2-9 (17): Filling with useful available excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
(APSS NO. 309 & 310)
for filling basement
Hall
Bed Room
Kitchen
Store
Passage
Toilet

3962.28

1 Cum

49291.00

1 Cum

8091.00

Data WS New
S.No.18

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

3.66
3.96
2.75
1.10
1.20
2.75

W.man.Qrt-ysr -337269598.xlsx

6.70
3.66
2.75
2.75
1.50
1.46

0.650
0.650
0.650
0.400
0.400
0.400

15.94
9.42
4.92
1.21
0.72
1.61
33.82 Cum

239.23

51

Page 52 of 3205

S.N.

Description of Item

BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS
456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS
code fo FOUNDATIONS, PLINTH, PEDESTALS

Nos

Qty

Rate

Per

Amount

Data WS New
S.No.99

for FOOTINGS Rectangle area


F-2 footings : A1,B1,C1,A2,B2,C2,C3,A4 & B4
Stair case Columns

1
1

for Pedastals
Footings - F2
Stair case Columns

1
1

Plinth Beams
A1 to B1, A2 to B2& C1to C2
B1 to C1, B2 to C2 & B3 to C3
A1 to A2, B1 to B2 & C1 to C2
A2 to A4 & B2 to B4
C2 to C3
A4 to A5

1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x

9
1
9
1
3
3
3
2
1
1

1.40
1.00
0.45
0.35
4.00
3.50
3.40
4.30
2.90
1.80

1.40
1.00
0.45
0.35
0.23
0.23
0.23
0.23
0.23
0.23

0.35
0.35
Total

6.17
0.35
6.52 Cum

8719.99

1 Cum

56854.00

0.60
0.45

1.09
0.06
1.15 Cum

8719.99

1 Cum

10028.00

0.83
0.72
0.70
0.59
0.20
0.12
3.16 Cum

10779.60

1 Cum

34064.00

0.30
0.30
0.30
0.30
0.30
0.30

BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS
456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS
code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

Data WS New
S.No.100

C2 Coloumns Up to Ground level


C1 Coloumns Up to Ground level
C2 Columns above GL and up to roof level
C1 Columns above GL and up to roof level

Lintels
over D1 Doors
over D2 Doors
over D3 Doors
over Windows - W1

1
1
1
1

1
1
1
1

x
x
x
x

x
x
x
x

9
1
9
1

2
3
1
4

0.23
0.23
0.23
0.23

1.50
1.00
1.00
1.80

W.man.Qrt-ysr -337269598.xlsx

0.30
0.45
0.30
0.45

0.23
0.23
0.23
0.23

0.70
0.70
5.46
5.46

0.20
0.20
0.20
0.20

0.43
0.07
3.39
0.57
4.46 Cum

10774.75

1 Cum

48055.00

0.14
0.14
0.05
0.33
0.66 Cum

11044.70

1 Cum

7290.00

52

Page 53 of 3205

S.N.

Description of Item

BLD-CSTN-3-16-(31)-C: Supply and placing of the M-20 Design Mix Concrete corresponding to IS
456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales &
other taxes on all materials including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS
code from standard suppliers approved by the department including pumping, centering, shuttering,
laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges
for finished item of work. for RCC SLABS, BEAMS

Nos

Qty

Rate

Per

Amount

Data WS New
S.No.101

125mm thick roof slab GF


Total Building
Stair case waist slab
Mid landing
Deduct stair case portion

1
1
1
-1

Roof Beams
A1 to C1
A2 to B2 & a4 to B4
B3 to C3
A1 to A4 & B1 to B4
C1 to C3
stair case Mid landing beam
Deduct Column portion for C2

1
1
1
1
1
1
-1

x
x
x
x

x
x
x
x
x
x
x

1
1
1
1

2
2
1
2
1
1
9

10.06
6.00
2.00
2.90

9.39
5.00
4.60
10.06
8.70
1.80
0.23

9.39
0.90
0.90
0.90

0.23
0.23
0.23
0.23
0.23
0.23
0.30

0.125
0.125
0.125
0.125
or Say

11.81
0.68
0.23
-0.33
12.39 Cum

9894.87

1 Cum

122597.00

0.230
0.230
0.230
0.230
0.230
0.230
0.230

0.99
0.53
0.24
1.06
0.46
0.10
-0.14
3.24 Cum

10280.70

1 Cum

33309.00

1 Sqm

9897.00

Sun shades of 0.60 Mts wide and 75mm thick at fixed end and 50mm thick at free end
Data WS New
S.No.101 IV

over D1 Doors
over Windows - W1
10

1
1

x
x

2
4

5.18
2.10

0.60
0.60

6.22
5.04
11.26 Sqm

BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using
hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite
Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to
required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc.,
complete for finished item of Work .
Below Ground Level
Round the building
Building short walls B1 to B4
A2 to C2
Wall between Kitchen and Toilet
Wash area Long wall
Toilet short wall
Deduct Column portion for C2
Above GL for Base ment
Round the building
Building short walls B1 to B4
A2 to C2

878.95

Bld up to 3F S.No
30

1
1
1
1
1
1
-1

x
x
x
x
x
x
x

1
1
1
1
1
1
9

32.58
6.93
7.96
4.00
2.70
1.50
0.23

0.60
0.60
0.60
0.45
0.45
0.45
0.45

0.65
0.65
0.65
0.40
0.40
0.40
-0.10

12.71
2.70
3.10
0.72
0.49
0.27
0.09

1
1
1

x
x
x

1
1
1

32.58
6.93
7.96

0.45
0.45
0.45

0.60
0.60
0.60

8.80
1.87
2.15

W.man.Qrt-ysr -337269598.xlsx

53

Page 54 of 3205

S.N.

Description of Item

Nos

Wall between Kitchen and Toilet


Wash area Long wall
Toilet short wall
Deduct Column portion for C2
11

1
1
1
-1

x
x
x
x

L
1
1
1
9

B
4.00
2.70
1.50
0.23

D
0.45
0.45
0.45
0.45

Qty

0.60
0.60
0.60
0.60
or Say

1.08
0.73
0.41
-0.56
34.56 Cum

Rate

4197.87

Per

Amount

1 Cum

145078.00

1 Cum

3498.00

1 Cum

91700.00

10 Sqm

52429.00

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 12mm
size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work with nomonal reinforcement
Data WS New
S.No.160

12

Bed blocks for fixing of Doors and Windows

10

0.23

0.23

0.10

0.21

Steps

0.5

20

0.90

0.30

0.15

0.41
0.62 Cum

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in
Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks,
Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like
mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item
of work
Round the building
Deduct Column portion for C2
Deduction for openings
Doors D1
Windows- W1
Ventilators - V1

13

5642.42

Data WS New
S.No.110

1
-1

x
x

1
9

32.58
0.23

0.23
0.23

3.36
3.36

25.18
-1.60

-1
-1
-1

x
x
x

2
4
1

1.05
1.50
0.60

0.23
0.23
0.23

1.98
1.50
0.45

-0.96
-2.07
-0.06
20.49 Cum

4475.33

BLD-CSTN-5-11 (49): 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3)
using second class traditional size bricks including cost of all materials, seigniorage charges, labour
and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for
finished item of work, but excluding conveyance charges of materials.
Bld up to 3F S.No
28

Building short walls B1 to B4


A2 to C2
Wall between Kitchen and Toilet
Wash area Long wall
Toilet short wall
Deduction for openings
Doors D2
Doors D3
Parapet Wall
13

1
1
1
1
1

x
x
x
x
x

1
1
1
1
1

6.93
7.96
4.00
2.70
1.50

3.36
3.36
3.66
3.66
3.36

23.28
26.75
14.64
9.88
5.04

-1
-1
1

x
x
x

3
1
1

1.05
0.92
32.58

1.98
1.98
0.60

-6.24
-1.82
19.55
91.08 Sqm

BLD-CSTN-8-6-(81)
Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance
of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc.,
complete for finished item of work. (As per SS 903). per 10 Sqm.

5756.37

Bld up to 3F S.No
38

Outer walls

W.man.Qrt-ysr -337269598.xlsx

54

Page 55 of 3205

S.N.

Description of Item

Nos

Round the building (including parapet both sides)


for Steps
DEDUCTIONS
Doors D1
Windows- W1
Ventilators - V1

Qty

1
1

x
x

1
20

33.50
0.90

4.68
0.45

156.61
8.10

-1
-1
-1

x
x
x

2
4
1

1.05
1.50
0.60

1.98
1.50
0.45

-4.16
-9.00
-0.27
151.28
151.30 Sqm

or Say
14

BLD-CSTN-6-4
Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance
of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc.,
complete for finished item of work. (As per SS 903). per 10 Sqm.
Inner walls
Hall
Bed Room
Kitchen
Store
Passage
Toilet
Doors D2
Doors D3

15

16

17

x
x
x
x
x
x
x
x

2
2
2
2
2
2
3
1

7.32
3.96
2.75
1.10
1.20
2.75
0.75
0.75

5.18
3.66
2.75
2.75
1.50
1.46

3.36
3.36
3.36
3.36
3.36
3.36
1.98
1.98

84.00
51.21
36.96
25.87
18.14
28.29
-4.46
-1.49
238.52 Sqm

BLD-CSTN-8-1-(76)
Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance
of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc.,
complete for finished item of work. (As per SS 903). per 10 Sqm.Ceiling

Amount

10 Sqm

21481.00

1281.35

10 Sqm

30563.00

10 Sqm

10067.00

10 Sqm

10572.00

Data WS New
S.No.73

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

7.32
3.96
2.75
1.10
1.20
2.75

5.18
3.66
2.75
2.75
1.50
1.46

37.92
14.49
7.56
3.03
1.80
4.02
3.15
71.97 Sqm

BLD-CSTN-11-5-(162)
White washing two coats with whiting of approved quality to give an even shade after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished
item of work, but excluding conveyance charges of materials

1398.74

Data WS New
S.No.38

Qty as per ceiling & inne rplastering


BLD-CSTN-11-8-(164)
Colour washing two coats with approved Colour and quality to give an even shade after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished
item of work, but excluding conveyance charges of materials
Qty as per external wall plastering
add for Sunshades

1419.73

Per

Data WS New
S.No.35

1
1
1
1
1
1
-1
-1

Hall
Bed Room
Kitchen
Store
Passage
Toilet
Add for exposed faces of beams etc.

Rate

310.49 Sqm

340.49

Bld up to 3F S.No
59

11.26

W.man.Qrt-ysr -337269598.xlsx

151.30
22.52

55

Page 56 of 3205

S.N.

Description of Item

Nos

Qty

Deduct Dadoing area of Toilets


18

Rate

-11.50
162.32 Sqm

510.74

Per

Amount

10 Sqm

8290.00

10 Sqm

35787.00

1 MTs

123432.00

1 Sqm.

15610.00

1 Rmt

6024.00

BLD-CSTN-10-25-(148)
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of
water proof compound per bag of cement laid over roof when it is green including cost of all
materials, seigniorage charges, excluding conveyance charges of materials and including all
operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread
lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
Data WS New
S.No.37

19

Qty as per Slab area


BLD-CSTN-4-1-(34)
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel
(MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works ,
including labour charges for straightening, cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lap-splicing with binding wire
of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including
cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour
charges such as cutting, bending, placing in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all floors.( APSS No.126

10.06

9.39

94.46 Sqm

3788.55

Data WS New
S.No.40

Footings and pedastals


Columns
Plinth Beams
Roof Beams
Lintels
125mm Thick Slabs and sun shades

20

7.67
4.46
3.16
3.24
0.66
13.09

25.00
120.00
70.00
100.00
75.00
80.00

Kg/Cum
Kg/Cum
Kg/Cum
Kg/Cum
Kg/Cum
Kg/Cum
Total
Or Say

191.75
535.20
221.20
324.00
49.50
1047.50
2369.15 Kgs
2.37 MTs

52081.12

Supply and fixing of Steel Glazed Window with double openable on both sides centrally fixed post
and MS Window Section of E Z 7 with lugs, glazing clips with other fittings and their fixtures including
supplying and fixing of 10 mm square bars @ 10cm c/c as per approved design with cost and
conveyance of all materials and labour charges including 4mm thick pin headed glass and approved
fixtures like MS Z shaped hold fast, lugs, tower bolts, etc., complete for finishing item of work
complete as directed by the department .
Bld up to 3F S.No
83

Windows- W1
21

1.50

1.50

9.00
9.00 Sqm.

Manufacture, Supply , Delivary and fixing of MS Door frame made with T angle of size 40x40x6 mm
with 10 mm square rod at bottom for tie rod with 3 nos. 125 mm Butt hings welded to the frame and
6 Nos. MS Z hold fasts with 20x5 mm MS Flat 200 mm long, including c/c of all materials and labour
chrges, fabrication, welding etc., complete
Doors D2

1734.40

Bld up to 3F S.No
81

6.100

W.man.Qrt-ysr -337269598.xlsx

18.30
18.30

Rmt

329.20

56

Page 57 of 3205

S.N.

Description of Item

22

Supply and fixing of 30 mm thick Flush Door shutter solid bond wood block board type with
commercial ply on both faces with 1no. 300 mm long Aldrop, 2 nos. 125 mm lond door handle, 1 no.
150 mm long tower bolt, 1 no. 250 mm long door latch 1 No. door stopper ( all fixturs MS Powder
coated ) including c/c of all materials and labour chrges etc., complete

Nos

Doors D2
23

Qty

Rate

Per

Amount

Bld up to 3F S.No
82

1.050

1.980

6.24
6.24 Sqm

1121.90

1 Sqm

7001.00

1 Sqm

1527.00

1 Sqm

123.00

10 Sqm

35470.00

10 Sqm

3738.00

Supply & Fixing of MS "L" Angle 25X25X3 mm door frames (W.C.) with 2 Nos. of 125mm long hinges
and shutter with 10 mm thick plaing cement bonded particle boards confirming to IS 14276 truly
exterior grade (Bison panel or equivalent ) including cost and conveyance of all materials and labour
charges etc., complete for Bathroom doors as directed by the Engineer-in-charge.
Bld up to 3F S.No
84

24

25

Doors D3
BMS-W.16: Supply, delivery and fixing of 50mm thick Cement Jali of size 0.90x0.45 m for Ventilator
including all labour charges etc., complete

Ventilators - V1 - 0.6 x 0.45 = 0.27 Sqm @ 7 Kg/Sqm


BLD-CSTN-9-1-(99)
Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs) set over
base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of
honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including
cost of all materials like cement, sand, and water and flooring stones etc., complete, including
seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of
work, but excluding the cost of conveyance of all materials.

0.750

1.980

1.49 Sqm

1024.80
Bld up to 3F S.No
70

0.60

0.45

0.27 Sqm

456.73

Bld up to 3F S.No.
43

Hall
Bed Room
Kitchen
Store
Passage
add for steps etc
26

1
1
1
1
1

x
x
x
x
x

1
1
1
1
1

7.32
3.96
2.75
1.10
1.20

5.18
3.66
2.75
2.75
1.50

37.92
14.49
7.56
3.03
1.80
0.60
65.40 Sqm

5423.51

BLD-CSTN-9-6-(104) : Flooring with ceramic tiles (Non skid type), set over base coat of cement
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full
depth mixed with pigment of matching shade, including cost of all materials like cement, sand water
and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but
excluding the cost of conveyance of all materials. (For Toilets)
Bld up to 3F S.No.
47

27

Toilet
BLD-CSTN-9-18-(116) : Dadooing to walls with Glazed colour tiles of any size 1st quality set over a
base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread
at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste
mixed with pigmant of matching shade including cost and conveyance of all materials like cement,
sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of
cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets)

2.75

1.46

4.02 Sqm

9298.76

Bld up to 3F S.No.
52

Toilet
Doors D3

1
-1

x
x

2
1

4.21
0.75

W.man.Qrt-ysr -337269598.xlsx

1.50
1.50

12.63
-1.13

57

Page 58 of 3205

S.N.

Description of Item

Nos

Qty
11.50 Sqm

28

29

BLD-CSTN-7-1-(72): Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop .
for including cost & conveyance of all materials to site , seignaiorage charges on all materials, labour
charges on all materials, curing etc., Complete for finished item of work
Around the Building
BMW-G.01: Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with
Double layer approved brand & manufacture with cover and suitable locking arrangement & making
necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

Per

6679.49

Amount

10 Sqm

7681.00

10 Sqm

1406.00

Bld up to 3F S.No.
33

33.50

0.600

20.10 Sqm

699.39

Bld up to 3F S.No.
85

1
30
31

Rate

500.00

500.00 Lit

7.27

1 Lit

Providing Internal electrification as per separate estimation.


Providing Internal Water supply and Sanitation as per separate estimation
Total Rs.
Cost for 1 No

W.man.Qrt-ysr -337269598.xlsx

Say Rs.

3635.00
1013448.00
30403.00
40538.00
1084389.00

10.84 Lakhs

58

Page 59 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat

Construction of Generator room near Infiltration Well


DETAILED AND ABSTRACT ESTIMATE
S.N
A
1

Description of work

Nos

Qty

Rate

Per

Amount

Earth Work Excavation for Footings


Columns Footings
RBR-FNDN-1-A : Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for Column pits and
Man Holes etc,.

1.80

1.80

1.80

46.66 Cum

Bld up to 3F
S.No 7

in all types of soils


BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth
Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for
finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS
308).

90 %

in Hard rocky soils


Earth Work Excavation for foundations
for Foundations of the Genarator room
for Ramp (3.34+2.34+2.34)

10 %

41.99 Cum

158.81

1 Cum

6668.00

1 Cum

4705.00

1 Cum

3311.00

1 Cum

1340.00

Data WS New
S.No.7

1
1

x
x

1
1

26.92
8.02

4.67 Cum
0.60
0.45

0.70
0.55

1007.47

11.31
1.98
13.29 Cum

BLD-CSTN-2-1 (9) - Ordinary Soil-Manual Means-Upto 3 m depth ; Earth work excavation for foundations
and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

Data WS New
S.No.4

in all types of soils


BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited)-Upto 3 m depth ; Earth work excavation and
depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour
charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

90 %

in Hard rocky soils


BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level
Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials,
labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level
curing etc., complete for finished item of work.for foundation and under flooring bed.

10 %

11.96 Cum

276.82

Data WS New
S.No.7

1.33 Cum

1007.47

Data WS New
S.No.28

a
b
c
d
e

Columns Footings
for foundations of Basement
for Ramp walls
Flooring
Flooring of pump room
Ramp portion

1
1
1

x
x
x

8
1
1

1.70
26.92
8.02

1.70
0.60
0.45

0.10
0.10
0.10

2.31
1.62
0.36

1
1

x
x

1
1

8.00
2.62

5.00
2.00

0.075
0.075

3.00
0.39

337269598.xlsx-Gen.Room 8x5

59

Page 60 of 3205

S.N

Description of work

Nos

Qty
7.68 Cum

Rate
3962.28

Per
1 Cum

Amount
30430.00

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456
using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code . for
FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)
Data WS New
S.No.99

Column footing.
i) Rectangular portion
ii) Trapizoid portion = 1/2 x ( A1 + A2 ) x h

Plinth Beam
Long walls
Short walls
Deduction for columns portion
Net Qty
BLD-CSTN-3-14-(31)-B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456
using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

0.5

1
1
-1

x
x
x

2
3
8

1.50
A1
2.25

8.46
5.46
0.230

1.50
A2
0.20

0.23
0.23
0.35

0.30

5.40

0.14

1.37
6.77 Cum

8719.99

1 Cum

59034.00

0.78
0.75
-0.13
1.40 Cum

10779.60

1 Cum

15091.00

0.20
0.20
0.20

Data WS New
S.No.100

a)

b)

Columns up to 3.66 Mts unsupported height above GL


Columns up to GL
Columns above GL up to plinth beam top level
Columns above plinth beam top level to slab top level
Columns Above slab level
Lintals
over door

1
1
1
1

x
x
x
x

8
8
8
8

337269598.xlsx-Gen.Room 8x5

0.23
0.23
0.23
0.23

3.02

0.35
0.35
0.35
0.35

0.20

1.26
0.60
4.28
0.60

0.20

0.81
0.39
2.75
0.39
4.34 Cum

10774.75

1 Cum

46762.00

0.48
0.48 Cum

11044.70

1 Cum

5301.00

60

Page 61 of 3205

S.N

Description of work

BLD-CSTN-3-14-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456
using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from
standard suppliers approved by the department including pumping, centering, shuttering, laying concrete,
vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of
work. for RCC SLABS, BEAMS

Nos

Qty

Rate

Per

Amount

Data WS New
S.No.101

c
9

b
c

Roof Beams
Over Long walls
Short Walls
Deduction for columns portion
Roof Slab - 125mm thick
BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard
granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,
including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and
shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item
of Work .
Ist Step below G.L(foundations)
Right round the building
Ramp walls
2nd Step above GL(basement)
Right round the building
Ramp Long walls
Ramp Short walls (0.8+0.0) / 2 = 0.40m
Deduct Column portion

1
1
-1

x
x
x

2
2
8

9.66
6.66
0.230

0.23
0.23
0.350

0.30
0.30
0.30

9.66

6.66

0.125

1.33
0.92
-0.19
2.06 Cum
8.04 Cum

10280.70
9894.87

1 Cum
1 Cum

21178.00
79555.00

1 Cum

80809.00

1 Cum

74380.00

10 Sqm

16791.00

Bld up to 3F
S.No 30

1
1

x
x

1
1

26.92
8.02

0.60
0.45

0.60
0.45

1
1
1
-1

x
x
x
x

1
1
2
6

26.92
3.00
1.55
0.23

0.45
0.45
0.45
0.30

0.60
0.45
0.40
1.20

9.69
1.62
7.27
0.61
0.56
-0.50
19.25 Cum

4197.87

10 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement
Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to
site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor,
scaffoding charges lift charges , curing charges etc., complete for finished item of work
Data WS New
S.No.110

Right round the building


Deductions
Collapsible doors
11

26.92

0.23

3.90

24.15

-1

2.62

0.23

2.50

-7.53
16.62 Cum

BLD-CSTN-5-11 (49): 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using
second class traditional size bricks including cost of all materials, seigniorage charges, labour and all
operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished
item of work, but excluding conveyance charges of materials.
Parapet wall

4475.33

Bld up to 3F
S.No 28

337269598.xlsx-Gen.Room 8x5

32.41

0.90

29.17 Sqm

5756.37

61

Page 62 of 3205

S.N

Description of work

Nos

Qty

Rate

Per

Amount

12 BLD-CSTN-10-25-(148): Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm
thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of
all materials, seigniorage charges, excluding conveyance charges of materials and including all
operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining,
curing, rounding off junctions of wall and slab etc,, complete for finished item of work
Data WS New
S.No.37

9.66

6.66

64.34 Sqm

13 BLD-CSTN-8-1-(76)
Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all
materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational,
incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished
item of work. (As per SS 903). per 10 Sqm.
to ceiling and bottom and sides of beams
14 BLD-CSTN-6-4
Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all
materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational,
incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished
item of work. (As per SS 903). per 10 Sqm.
Internal long walls
Internal short walls

9.66

6.66

64.34 Sqm

24376.00

1398.74

10 Sqm

8999.00

10 Sqm

6996.00

10 Sqm

20233.00

10 Sqm

2259.00

10 Sqm

7043.00

Data WS New
S.No.35

x
x

1
1

8.00
5.00

4.20
4.20

33.60
21.00
54.60 Sqm

15 BLD-CSTN-8-6-(81)
Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all
materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational,
incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished
item of work. (As per SS 903). per 10 Sqm.

1281.35

Bld up to 3F
S.No 38

External long walls


External short walls
both sides of the parapet wall

1
1
1

x
x
x

2
2
2

8.46
5.46
29.17

4.20
4.20

71.06
45.86
58.34
175.26

Deductions
Collapsible door

-1

2.62

2.50

-32.75
142.51 Sqm

16 BLD-CSTN-7-1-(72)
Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3 )Prop. for including cost &
conveyance of all materials to site , seignaiorage charges on all materials, labour charges on all materials,
curing etc., Complete for finished item of work

Qty as ceiling plastering


Qty as per External Plastering

10 Sqm

Data WS New
S.No.73

1
1

basement Right round the building


17 BLD-CSTN-11-5-(162)
White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing
the surface to remove all dirt and remains of loose powdered materials including cost of all materials,
labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but
excluding conveyance charges of materials

3788.55

1419.73

Bld up to 3F
S.No 33

26.92

0.60

32.30 Sqm

699.39

Data WS New
S.No.38

1
1

x
x

1
1

337269598.xlsx-Gen.Room 8x5

64.34
142.51
206.85 Sqm

340.49

62

Page 63 of 3205

S.N

Description of work

Nos

Qty

Rate

Per

Amount

18 BLD-CSTN-11-10-(167)
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and
shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even
shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials,
including cost and conveyance of all materials to work site and all operational, incidental, labour charges
etc. complete for finished item of work as per SS 911 for internal walls
Bld up to 3F
S.No 61

Qty as internal plastering


19 BLD-CSTN-9-13-(111)
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine
crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding
1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining
including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage
charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials

54.60 Sqm

953.55

10 Sqm

5206.00

10 Sqm

14943.00

1 Sqm

82663.00

1 Kg

83956.00

Data WS New
S.No.135

1
1

Ramp portion

x
x

1
1

8.00
3.00

5.00
2.00

40.00
6.00
46.00 Sqm

3248.56

20 BMT-F.30
Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm
centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical
frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with
65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking
arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel
primer etc., complete for finished item of work as per special spn 1105
Bld up to 3F
S.No 69

Doors
21 BLD-CSTN-4-1-(34)
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS)
steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG,
forming grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including
cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as
cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for
finished item of work in all floors.( APSS No.126

2.62

2.50

26.20 Sqm

3155.09

Data WS New
S.No.40

Column Footings and pedastals


Columns
Plinth beam
Lintals
Roof Beams
Roof Slab

6.77
4.34
1.40
0.48
2.06
8.04

337269598.xlsx-Gen.Room 8x5

25 Kgs
80 Kgs
70 Kgs
60 Kgs
80 Kgs
100 Kgs

169.25
347.20
98.00
28.80
164.80
804.00
1612.05 Kg

52.08

63

Page 64 of 3205

S.N

Description of work

Nos

Qty

Rate

Per

Amount

22 BLD-CSTN-2-9 (17)
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and
basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by
watering and ramming including cost and conveyance of water to work site and all operational, incidental,
labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Data WS New
S.No.18

1
2

Basement
Ramp
Net Qty
Sub - Total -A
LS provision for Writing of Name plate
LS for Internal electrification @ 4.5%
Sub - Total -B

1
1

x
x

1
1

8.00
2.62

5.00
2.00

0.60
0.45

24.00
2.36
26.36 Cum

239.23

1 Cum

6306.00
708335.00
5000.00
31875.00
36875.00

7.45 Lakhs

337269598.xlsx-Gen.Room 8x5

64

Page 65 of 3205

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat
Name of Work: Supply, delivery, installation testing of pumps sets
S.N
Item
Supply
and
erecting
approved
make
pump
with
impeller,
priming funnel cork, companion metallic flanges, with
I

Nos

KW

Total KW

bolts and nuts and mounted on a common shaft of high efficient squirrel cage Induction motor totally enclosed
and fan cooled type suitable to operate on 415V, 3 phase,...................exculding suction / delivery pipe with
nuts duly grouted on existing C.C foundation and bolts, spring washers of requisite size for monoblock motor
and pump (IS : 9079). including suction and delivery piping, valves, NR valves, MS/CI specials if any, cost of all
materials, fabrication, starter, panel board, capacitors and all electrical installation, labour for erection, trial run,
maintenence, including all taxes and duties etc complete.

VT pumpsets at Intake well


Supply, delivery and Installation of 38.5 KW Pump sets 2 Nos at Intakwell (1 No working and 1 No standby
with a discharge of 72.46 Lps against a head of 54m)
Total Rs.

Pump sets - 337269598.xlsx

41

123 KW

65

Page 66 of 3205

NDA NAGARA PANCHAYAT

ply scheme for Palakonda Nagara Panchayat

delivery, installation testing of pumps sets


Rate

30000.00

Per

1.00 KW

Amount

3690000.00
3690000.00

Pump sets - 337269598.xlsx

66

Page 67 of 3205

S.N
I

PALAKONDA NAGARA PANCHAYAT


Comprehensive Water supply scheme for Palakonda Nagara Panchayat
Name of Work: Supply, delivery, installation testing of Generator sets
Item
Nos
Total KVA
Supply, Transportation, erection and commissioning (Excluding Foundation) of 3 Phase, 415, 50Hz, water cooled multi
cylinder diesel generator set with alternator of - - - KVA/ - - - - - KW out put contineous rating directly coupled Engine and
Alternator with guard and mounted on a common base plate of Robust construction and complete without control panel
having IP-52 protection, Acoustic Enclosure as per CPCB norms , sound absorbing material, t to restrict sound level up
to 75 dB up to 1 mtr distance and as per CPCB norms etc as per following specifications mentioned below.
A. Alternator : Kirloskar / Stamford / Crompton Greaves / Leroy Somer make. The alternator of the output rating shall be
3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self regulated, and shall confirm
to IS: 13364 of 1992 with regulation of +5% from no load to full load. degree of protections shall be IP21.

B.Diesel Engine : Kirloskar / Cummins / Mahindra & Mahindra Diesel Engine start, developing suitable -------------BHP output at 1500 RPM with mechanical / electronic governing so as to enable the alternator to give - - - - -KVA
continuous output at 0.8 P.F. lagging at NTP conditions. The diesel engine shall be capable of providing 10% O/L for 1 Hr
for every 11 Hrs of continuous running at full load. The engine with 1st filling of oil and Diesel etc. 01.
Exhaust pipe of required size and length with insulation or clading. 02. Diesel tank suitable for 8 to 12 Hours running
capacity.
03. Residential Silencer.04. SMF Batteries with leads as per the Manufacturer standards

Gen sets - 337269598.xlsx

67

Page 68 of 3205

S.N

Item

Nos

C. AMF Control Panel:- AMF control panel shall be fabricated with 16SWG
CRCA sheet shall be
enclosed with dust and Vermin proof, floor mounted / wall mounted type and shall be comprising the following.
01. Voltmeter with selector switch.
02. 4 Pole MCCB incomer of ----------A rating of Schenieder / L&T make for EB and DG.
03. Ammeter with selector switch with CTs.
04. PF Meter and frequency Meter.
05. Indicator lamps (set Run, Load ON) with fuses.
06. KWH Meter of required rating.
07. Set of control fuses and current transformer.
08. Input Terminal board and output Terminal Board.
09. Battery charger with transformer rectifier unit.
10. Alternator supply air break contactor of L&T make.
11. Main supply air break contactor of L&T make.
12. Audio Visual announciation.
13. Main supply voltage set of control relays and timers with one mode selector switch, set of push buttons.
14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core

Total KVA

totally

at Infiltration well
125 KVA, 3 Phase, 415, 50Hz, 154BHP, water cooled multicylinder diesel generator set with alternator of 125 KVA
out put continous rating at 0.8 p.f, and Batteries .

125 KVA

Total Rs.

Gen sets - 337269598.xlsx

68

Page 69 of 3205

NDA NAGARA PANCHAYAT


ly scheme for Palakonda Nagara Panchayat
livery, installation testing of Generator sets
Rate

Per

Gen sets - 337269598.xlsx

Amount

69

Page 70 of 3205

Rate

1189975.00

Per

1 No

Amount

1189975.00
1189975.00

Gen sets - 337269598.xlsx

70

Page 71 of 3205
Palakonda Nagar Panchayat
Comprehensive Drainage Scheme for Palakonda Nagar Panchayat

Name of Work: Supply, delivery, installation of Out door Transfarmers at Infiltration well
S.No

Description

Nos

Supply, transportation and delivery at site of 3 Phase, 50 Hz, oil immersed and naturally cooled, outdoor / Indoor type copper
wound transformer designed and manufactured as per IS 2026-1977 and 1st filling of oil as per IS 335 of 1993, connected delta
on primary side and Star on secondary side with additional neutral brought out on load side, 1100V / (433V / 415V) with HV tapping
+ or - 2.5% contineously rated for full load and temporature rise not exceeding 50C in oil and 55C rise by th resistance of the
winding after contineous run on full load rating complete with the following standard mountings. Makes: Kirloskar / Vijay Electricals /
PETE / Esennar

Qty

(Note:Other than these makes / brands mentioned rate may be allowed as approved by AP Electricity Board).
1). Rated KVA :........KVA, 2). Service: Outdoor / Indoor, 3). Mounting : Plinth,
4). Copper wound: Double, 5).Type : Core, 6). Cooling : ONAN, 7). Temp Rise : 55:C.,
8). Vector Group: Dyn 11, 9). Primary Connection : Delta, 10). Primary Volts : 11000,
11). Primry Frequency : 50, 12) .Primary
Phases : 3, 13). Primary wires: 3,
14). Secondary connection : Star, 15) . Secondary Volts : 415 / 433V,
16) . Secondary phases : 3, 17) . Secondary wires: 4,
18) . Taps on primary winding for primary voltage variation : +7.5% to - 7.5% in steps of 2.5%,
19). Terminal arrangement. a). HV: Bare Busings / Cable end box b). LV : Cable box
20) . LV : One separate terminal for earthing.
21). No load losses (Watts): .......As per IS specification
22).Load losses (Watts):..As per IS specification,
23). Impedance(Z%) : .As per IS specification
24). Fittings & Accessories.
a. Rating and terminal marking plate b. Earthing terminals, c. Lifting Lugs
d. Conservator with drain plug. e. Oil level Indicator, f. Dehydrating silicagel breather
g. Air release device, h. Drain cum filter wall, i. Explosion vent with diaphragm j. Radiators (Attachable), k. Seperate neutral
bushing, l. Uni directional flat rollers.
a
b

160 KVA Copper Wound Transformer at Intake well


Cost of CRS plinth with fencing including cost and conveyance of all material and all labour charges etc,. Complete.

Total Rs.

Transformers -STP-I 337269598.xlsx

71

Page 72 of 3205

ion well

Qty

Rate

No

335164

Unit

1 No

Amount

335164.00
50000.00
385164.00

Transformers -STP-I 337269598.xlsx

72

Page 73 of 3205
PALAKONDA NAGARA PANCHAYAT
Comprehensive Water supply scheme for Palakonda Nagara Panchayat
I

ESTIMATION FOR HOUSE SERVICE CONNECTION INCLUDING CONSTRUCTION OF BRICK CHAMBER FOR WATER METER ( for Existing)
Description

No

Size in Mts
Wall thick ness in Mts
A
1

House service connection

Chamber

RBR-FNDN-1: Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for
Sumps, Thrust Blocks,Chambers and Man Holes etc,.

Qty

Rate

Per

Amount

0.45

6468 No

1.10

0.95

0.55

3717.48 Cum

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring bed.

1 No

9831360.00

158.81

1 Cum

590373.00

1 Cum

2797003.00

Data WS New
S.No.29

6468

1.10

0.95

0.10

675.91 Cum

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in
Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks,
Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like
mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished
item of work
Walls
Long Walls
Short Walls

1520.00

Data WS New
S.No.8

6468

D
0.45
0.20

Providing House service connections including supply, delivery, laying, jointing and testing, including
MDPE PE 80 Electro Fusion Tapping as per BSEN 12201/3 EN 1555/3 or ISO 8085-3 with Pressure
RATING as PN12.5, including compression elbow with one side compression end to suit or
(20mm or 25mm OD )MDPE pipe and other side with male off-take with SS-304 material inserts of
sizes OR BSP threads, Body , Nut and cap of Polypropylene , Clip ring of POM(Acetylic resin)
and O ring of NBR material, as per ISO 14236-2000 Standards with pressure rating PN 16,
including MDPE PE80 Blue Pipe of 5 8 metres maximum length as per ISO 4427 Rev 1. for
conveyance of potable water .The pressure rating of (20mm OD) will be PN16 and that of
(25mm OD ) will be PN12.5 including laying, jointing and testing of individual connections
excluding earth work and restoration charges for the road. Certificate for compliance of testing these
fittings as per BS-6920 by designated laboratories to be produced. Supply of Fixing of high precise
and tamper proof water meters as per IS standards make including cost of earth work , laying ,
jointing and testing of individual connections excluding restoration charges for the road.

6468

B
0.60

4138.13

Data WS New
S.No.110

6468
6468

x
x

2
2

1.00
0.45

0.20
0.20

0.45
0.45

1164.24
523.91

Page 74 of 3205
1688.15 Cum
4

BLD-CSTN-8-4-(79): Plastering with 12mm thick in single coat in CM (1:6) finished smooth including
cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing,
scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

Inside chamber
Flooring
5

4475.33

1 Cum

7555028.00

1163.96

10 Sqm

863895.00

1548.00

1 No

Bld up to 3F
S.No.37

6468
6468

x
x

2
1

1.05
0.45

0.45
0.45

6112.26
1309.77
7422.03 Sqm

Manufacture Supply & Delivery of manhole covers and frames anywhere in A.P., F.O.R. destination
including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and
other Govt levies etc., as applicable. I.S.I Mark
24x18 size
Total cost new HSC including Chamber & Chamber
Deduct 16mm dia MDPE pipe cost for existing connection

6468

6468 No

Rs
-6468

7.50

-48510.00 Rmt

84.67

1 Rmt
Rs.
Say Rs.

10012464.00
31650123.00
-4107342.00
27542781.00

275.43 Lakhs

Page 75 of 3205
PALAKONDA NAGARA PANCHAYAT
Comprehensive Water supply scheme for Palakonda Nagara Panchayat
I

ESTIMATION FOR HOUSE SERVICE CONNECTION INCLUDING CONSTRUCTION OF BRICKE CHAMBER FOR WATER METE
Description

No

Size in Mts
Wall thick ness in Mts
A
1

House service connection

B
1

Chamber

B
0.60

0.45
0.20

1.10

0.95

Providing House service connections including supply, delivery, laying, jointing and testing, including
MDPE PE 80 Electro Fusion Tapping as per BSEN 12201/3 EN 1555/3 or ISO 8085-3 with Pressure
RATING as PN12.5, including compression elbow with one side compression end to suit or
(20mm or 25mm OD )MDPE pipe and other side with male off-take with SS-304 material inserts of
sizes OR BSP threads, Body , Nut and cap of Polypropylene , Clip ring of POM(Acetylic resin)
and O ring of NBR material, as per ISO 14236-2000 Standards with pressure rating PN 16,
including MDPE PE80 Blue Pipe of 5 8 metres maximum length as per ISO 4427 Rev 1. for
conveyance of potable water .The pressure rating of (20mm OD) will be PN16 and that of
(25mm OD ) will be PN12.5 including laying, jointing and testing of individual connections
excluding earth work and restoration charges for the road. Certificate for compliance of testing these
fittings as per BS-6920 by designated laboratories to be produced. Supply of Fixing of high precise
and tamper proof water meters as per IS standards make including cost of earth work , laying ,
jointing and testing of individual connections excluding restoration charges for the road.

1921

1921

RBR-FNDN-1: Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for
Sumps, Thrust Blocks,Chambers and Man Holes etc,.

Page 76 of 3205
2

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring bed.

1921

1.10

0.95

Page 77 of 3205
3

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in
Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks,
Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like
mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished
item of work
Walls
Long Walls
Short Walls

x
x

2
2

1.00
0.45

0.20
0.20

1921
1921

x
x

2
1

1.05
0.45

0.45

1921

BLD-CSTN-8-4-(79): Plastering with 12mm thick in single coat in CM (1:6) finished smooth including
cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing,
scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.

Inside chamber
Flooring
5

1921
1921

Manufacture Supply & Delivery of manhole covers and frames anywhere in A.P., F.O.R. destination
including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and
other Govt levies etc., as applicable. I.S.I Mark
24x18 size
Total cost new HSC including Chamber & Chamber

Page 78 of 3205

Nagara Panchayat

HAMBER FOR WATER METER


D

Qty

Rate

Per

Amount

0.45

0.55

1921 No

1520.00

1104.09 Cum

158.81

1 No

1 Cum

2919920.00

175341.00

Page 79 of 3205

0.10

200.74 Cum

4138.13

1 Cum

830688.00

Page 80 of 3205

0.45
0.45

0.45

345.78
155.60
501.38 Cum

4475.33

1 Cum

2243841.00

1815.35
389.00
2204.35 Sqm

1163.96

10 Sqm

256578.00

1548.00

1 No

2973708.00
9400076.00
9400079.00

1921 No

Rs
Rs.
Say Rs.

94.00 Lakhs

Page 81 of 3205

PALAKONDA NAGA PANCHAYAT


COST OF MATERIALS - 2015-2016

SL
NO

NAME OF THE MATERIAL

SOURCE

Unit

LEAD
IN KM

Initial
Cost

Conveyance
Charges
including OH &
CP

Sand for mortar (Pg.19, Sl.No.27)

Sakeli

cum

610.00

82.70

Sand for filing (Pg.19, Sl.No.27)

Sakeli

cum

460.00

82.70

Sand for Motor, Plastering

Sakeli

cum

677.00

82.70

Gravel (M-008)

Lachayyapeta

cum

16

103.00

219.10

Crusher dust (M-021,pno 32)

Santhapeta

cum

357.00

95.10

Aggregates 6 mm nominal size

(M-050)

Lachayyapeta

cum

16

735.00

219.10

Aggregates 10 mm nominal size (M-051)

Lachayyapeta

cum

16

935.00

219.10

Aggregates 13.2/12.5 mm nominal size (M-052) Lachayyapeta

cum

16

1097.00

219.10

Aggregates 20 mm nominal size (M-053)

Lachayyapeta

cum

16

1365.00

219.10

10 Aggregates 25 mm nominal size (M-054)

Lachayyapeta

cum

16

1313.00

219.10

11 Aggregates 40 mm nominal size (M-055)

Lachayyapeta

cum

16

845.00

219.10

(Pg.19, Sl.No.28)

Page 82 of 3205

12 Aggregates63mm-45mm (M-038)
Aggregates53mm-22.4mm (M-036)

Lachayyapeta

cum

16

662.00

219.10

Lachayyapeta

cum

16

872.00

219.10

13 Graded HBG metal - (70% - 20 mm + 10% - 12 mm + 10% -10mm 10% - 6 mm)

Page 83 of 3205

14

Fly ash bricks - 290 x 22 x 140 mm, 50Kg/Sq


Cm. (1000 Nos.)

Local

0.00

15 Cement

Local

0.00

16 Steel

Local

0.00

17 1st Class Mason


18 2 nd Class Mason
19 Mazdoor
20 R.R Masanary Rough stone granite (M-148 P-39 Bejji

cum

252.00

119.90

Bond stone (250x250x450 =0.0281) sl no 76 pno 14 Each


21 39.00 ( 1.00/0.0281 =35.58 nos )
Bejji
(35.58*39.00=1387.62)

cum

1387.62

119.90

C R Stone pn 12 slno 13 Each 20.00


Bejji
(30*30*45=0.040)(1/0.040=26.00 nos) 26*23.00

cum

598.00

119.90

22

23 Water 1KL
24

Aggregates13.20/12.50 mm nominal size (m052)

cum
Lachayyapeta

cum

16

1097.00

219.10

25 45 mm to 22.40 mm (PNO18)

Lachayyapeta

cum

16

1145.00

219.10

26 22.40 mm to 2.36 mm (M-031)

Lachayyapeta

cum

16

914.00

219.10

27 2.36 mm below (M-020 )

Lachayyapeta

cum

16

489.00

219.10

28 25 mm to 10 mm (M-046)

Lachayyapeta

cum

16

1210.00

219.10

29 10 mm to 05 mm (PNO11)

Lachayyapeta

cum

16

875.00

219.10

30 5 mm below (PNO18)

Lachayyapeta

cum

16

308.00

219.10

Page 84 of 3205

31 9.5 mm to 11.20 mm (PNO18)

Lachayyapeta

cum

16

656.00

219.10

32 5 mm to 7 mm (PNO18)

Lachayyapeta

cum

16

557.00

219.10

Page 85 of 3205

Deduct intial
charges of 1.00
Km in
conveyance
charges

Conveynance
charges incuding
OH & CP

Actual
conveynance
charges excluding
OH & CP

TOTAL

-31.00

51.70

45.50

655.50

-31.00

51.70

45.50

505.50

-31.00

51.70

45.50

722.50

-31.00

188.10

165.56

268.56

-29.90

65.20

57.39

414.39

-29.90

189.20

166.53

901.53

-29.90

189.20

166.53

1101.53

-29.90

189.20

166.53

1263.53

-29.90

189.20

166.53

1531.53

-29.90

189.20

166.53

1479.53

-29.90

189.20

166.53

1011.53

Page 86 of 3205

-29.90

189.20

166.53

828.53

-29.90

189.20

166.53

1038.53
1398.73

Page 87 of 3205

5.52
32.00
420.00
375.00
320.00
-29.90

90.00

79.21

331.21

-29.90

90.00

79.21

1466.83

-29.90

90.00

79.21

677.21

103.00

103.00

103.00

-29.90

189.20

166.53

1263.53

-29.90

189.20

166.53

1311.53

-29.90

189.20

166.53

1080.53

-29.90

189.20

166.53

655.53

-29.90

189.20

166.53

1376.53

-29.90

189.20

166.53

1041.53

-29.90

189.20

166.53

474.53

Page 88 of 3205

-29.90

189.20

166.53

822.53

-29.90

189.20

166.53

723.53

Page 89 of 3205

Name of the ULB

Kandukur Municipality

Name of the Scheme

Kandukur Mutton Market

Municipal allowence on Labour Component

20%

SBC - T/Sqm

30

Wind Pressure in Miles/Second


Wind Pressure in Kg/Sqm
Sesmic Zone

44
200
Zone-II

Water charges - Rural

103.00

Rural area allowence for WTP


Leads for the Material as per Lead statement
Sand for filling
Sand for Concrete
Sand for Mortar
Mooram & Gravel
Stone
Metal
Bricks
DI pipes

SSR
Month

0%

15 Km
15 Km
15 Km
17 Km
63.5 Km
63.5 Km
0 Km

Data Based on 2015-16 SSR


20/02/16

Material cost ( Andhra Pradesh State )


Description

as per SSR

Ref

Market Rate for

Andhra Pradesh

Unit

Used for

Farmule

RCC pipes

R1+R2

MS-pipe

R1

PSC-NC

R1+R2

PSC-C &
BWSC

R1+R2+R3.

R1+R2+R3.

Nov-15

OPCement- 43/53 grade

4000

Pg-11

5740.00 MT

Portland Pozzolana Cement

0.00

6100.00 MT

Portland Slag Cement

0.00

5520.00 MT

STEEL
6mm MS rods

41000

Pg-20/ PH

36000.00 MT

M.S.Flats

46000

SN.69/ Pg.14

38000.00 MT

Mild Steel, structural steel, i.e. Angles,channels and "I"


sections
TMT/HYSD bars

45000

SN.68/ Pg.14

38000.00 MT

Fe-415

46500

SN.62/ Pg.13

34000.00 MT

Fe-500

46500

SN.62/ Pg.14

35000.00 MT

MS plates

46000

SN.69/ Pg.14

37000.00 MT

HSCR steel Bars-Fe-500


PC drawn wire/HT wire 3mm

36000.00 MT
59500

Pg-35/ PH

PC drawn wire/HT wire 4mm


HR sheet in coils 1.6mm

51750.00 MT
51000.00 MT

50000

Pg-38/ PH

5.5/6.0mm MS wire rod coil

48000

Pg-40/ PH

36000.00 MT

BWSC

Foundry grade Pig Iron(3.00 to 2.24) excluding taxes

27500

Pg-62/ PH

21000.00 MT

CI & DI

Coke (as per 2015-16 SSR)

36570

Pg-70/ PH

36570.00 MT

CI Spe

HR sheet in coils 2.0mm

37500.00 MT
36000.00 MT

Other rates
Fiber

76000

AC pipes

resin cost for PE - 80 grade

118720

HDPE-80

resin cost for PE- 100 grade

119750

HDPE-100

79179

PVC

resin cost for PVC pipe

W x 0.85 x IC

Taxes ;ST,CED etc,.


Sales Tax
Central Excise Duty
APGST (on Valves etc,.)
Over heads & Contractors Profit

5.00%
12.50%
14.50%
13.615%

VAT

0.00%

Labour cess
Total of VAT & LC
cost variation during execution

0.00%
0.00%
0.00%

20mm Graded Metal


20mm Metal

0.70 Cum

Main sheet

2009.81

1 Cum

1406.87

Page 90 of 3205

12mm Metal
10mm Metal
6mm Metal

0.10 Cum
0.10 Cum
0.10 Cum

1741.81
1579.81
1379.81

Total Cost

Structural steel fabrication

24.00

SN.15/ Pg.23

1 Kg

Water charges (Urban)

103.00

M-189

1 Kl

Water charges (Rural)

77.00

M-189

1 Kl

Gelatin 80 per cent - M-104


Electric Detonators @ 1 detonator for 2 gelatine sticks of
285 gm each -M-094

Main sheet

1 Cum
1 Cum
1 Cum

174.18
157.98
137.98
1877.01

Page 91 of 3205

Kandukur Municipality
DATA BASED ON - 2015 - 2016 SSR
20/02/16
Statement showing the cost of Materials for the year 2015-16
Ref.to SSR

Sl.
No.

Description

Item Nos. /
Sl.No

Pg.No

Unit

Basic rate
excluding
Seign's

Lead Charges
Lead in Km

Including CP Excluding CP

Total cost in Rs.

Fine aggregate Sand for filling

M-004

25

1 Cum

460.00

15 Km

206.70

181.93

641.93

2
3

Fine aggregate sand for Concrete & Filtering items


Fine aggregate sand for Mortar, Plastering & Sand blasting

M-005
M-006

25
25

1 Cum
1 Cum

610.00
677.00

15 Km
15 Km

206.70
206.70

181.93
181.93

791.93
858.93

Moorum

M-007

25

1 Cum

128.00

17 Km

231.50

203.76

331.76

5
6

Gravel/Quarry spall
Earth Cost or compensation

M-008
M-092

25
29

1 Cum
1 Cum

103.00
40.00

17 Km
5 Km

231.50
82.70

203.76
72.79

306.76
112.79

79
M-148

14
32

13

12

14
75
76
M-002
M-003

14
14
25
25

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

318.00
252.00
552.00
468.00
1278.00
1040.00
147.00
164.00

64 Km
64 Km
64 Km
64 Km
64 Km
64 Km
64 Km

732.60
732.60
732.60
732.60
732.60
732.60
732.60
0.00

644.81
644.81
644.81
644.81
644.81
644.81
644.81
0.00

962.81
896.81
1196.81
1112.81
1922.81
1684.81
791.81
164.00

7
8
9
10
11
12
13
14

STONE FOR MASONRY WORK


Un Coursed rubble stone
Randam Rubble stone
Coursed rubble stone 30 x 30 x 45 cm (Rs-20/each) -24 Nos/m3
Coursed rubble stone 30 x 30 x 60 cm (Rs-23/each)-18 Nos/m 3
Through stones 20 x 20 x 30 to 45 cm long (Rs-23/each )-56 Nos/m3
Through stones 25 x 25 x 45 to 60 cm long (Rs-39/each)-27 Nos/m3
Quarried stone 150 - 200 mm size
Boulder with minimum size of 300 mm for Pitching

12

Sub - Base Materials - Grainte

39 Km

15

Filter media/Filter Material as per Table 300-3 (MoRT&H


Specification)

M-012

26

1 Cum

345.00

64 Km

732.60

644.81

989.81

16
17
18
19
20
21
22
23
24
25
26
27
28

53 mm to 9.5 mm
37.5 mm to 9.5 mm
26.5 mm to 9.5 mm
9.5 mm to 4.75 mm
9.5 mm to 2.36 mm
4.75mm to 2.36 mm
4.75mm to 75 micron
mm
2.36 mm
Stone crusher dust finer than 3mm
2.36 mm & below
4.75mm to 75
micron
mm
4.75 mm
to 2.36 mm
9.5 mm to 4.75 mm

M-013
M-014
M-015
M-016
M-017
M-018
M-019
M-020
M-021
M-022
M-023
M-024
M-025

26
26
26
26
26
26
26
26
26
26
26
26
26

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

667.00
685.00
711.00
592.00
582.00
510.00
489.00
489.00
357.00
438.00
474.00
474.00
561.00

64 Km
64 Km
64 Km
64 Km
64 Km
64 Km
64 Km
64 Km
64 Km
64 Km
64 Km
64 Km
64 Km

732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60

644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81

1311.81
1329.81
1355.81
1236.81
1226.81
1154.81
1133.81
1133.81
1001.81
1082.81
1118.81
1118.81
1205.81

337269598.xlsx C-Mat

Page 92 of 3205

Ref.to SSR

Sl.
No.

Description

Item Nos. /
Sl.No

Pg.No

Unit

Basic rate
excluding
Seign's

29
30
31
32

26.5 mm to 4.75 mm
26.5 mm to 9.5 mm
37.5 mm to 9.5 mm
53 mm to 26 .5mm
AGGRIGATES -SS.5

M-026
M-027
M-028
M-029

26
26
26
26

1 Cum
1 Cum
1 Cum
1 Cum

619.00
620.00
685.00
850.00

33

Aggregates below 5.6 mm

M-030

26

1 Cum

557.00

34

Aggregates 22.4 mm to 2.36 mm

M-031

26

1 Cum

914.00

35
36

Aggregates 22.4 mm to 5.6 mm


Aggregates 45 mm to 2.8 mm

M-032
M-033

26
26

1 Cum
1 Cum

1040.00
667.00

37
38

Aggregates 45 mm to 22.4 mm
Aggregates 53 mm to 2.8 mm

M-034
M-035

27
27

1 Cum
1 Cum

1145.00
914.00

39

Aggregates 53 mm to 22.4 mm

M-036

27

1 Cum

872.00

40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates
Aggregates

M-037
M-038
M-039
M-040
M-041
M-042
M-043
M-044
M-045
M-046
M-047
M-048
M-049
M-050
M-051

27
27
27
27
27
27
27
27
27
27
27
27
27
27
27

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

714.00
662.00
635.00
875.00
704.00
798.00
919.00
1029.00
1210.00
1129.00
1040.00
1103.00
1145.00
735.00
935.00

55

Aggregates 13.2/12.5 mm nominal size

M-052

27

1 Cum

1097.00

56

Aggregates 20 mm nominal size

M-053

27

1 Cum

1365.00

57

Aggregates 25 mm nominal size

M-054

27

1 Cum

58

Aggregates 40 mm nominal size

M-055

27

1 Cum

59

Coarse aggregate 10-4.75 mm

11

60

Coarse aggregate 20-10 mm

11

61

Coarse aggregate 40-20 mm

62

Coarse aggregate 80-40 mm

10

63 mm to 2.8 mm
63 mm to 45 mm
90 mm to 45 mm
10 mm to 5 mm
11.2 mm to 0.09 mm
13.2 mm to 0.09 mm
13.2 mm to 5.6 mm
13.2 mm to 10 mm
20 mm to 10 mm
25 mm to 10 mm
19 mm to 6 mm
37.5 mm to 19 mm
37.5 mm to 25 mm
6 mm nominal size
10 mm nominal size

Lead Charges
Lead in Km

Total cost in Rs.

732.60
732.60
732.60
732.60

644.81
644.81
644.81
644.81

1263.81
1264.81
1329.81
1494.81

Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km

732.60

644.81

1201.81

732.60

644.81

1558.81

732.60
732.60

644.81
644.81

1684.81
1311.81

732.60
732.60

644.81
644.81

1789.81
1558.81

732.60

644.81

1516.81

732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60
732.60

644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81
644.81

1358.81
1306.81
1279.81
1519.81
1348.81
1442.81
1563.81
1673.81
1854.81
1773.81
1684.81
1747.81
1789.81
1379.81
1579.81

732.60

644.81

1741.81

64 Km
64 Km

732.60

644.81

2009.81

1313.00

732.60

644.81

1957.81

845.00

64 Km

732.60

644.81

1489.81

1 Cum

875.00

644.81

1519.81

1210.00

64 Km
64 Km

732.60

1 Cum

732.60

644.81

1854.81

11

1 Cum

1145.00

64 Km

732.60

644.81

1789.81

11

1 Cum

635.00

64 Km

732.60

644.81

1279.81

337269598.xlsx C-Mat

64 Km
64 Km
64 Km
64 Km
64 Km

Including CP Excluding CP

64
64
64
64
64
64
64
64
64
64
64
64
64
64
64
64
64
64
64
64
64
64
64

Page 93 of 3205

Ref.to SSR

Sl.
No.

Description

Item Nos. /
Sl.No

Pg.No

Unit

Basic rate
excluding
Seign's

Lead Charges
Lead in Km

Including CP Excluding CP

Total cost in Rs.

63

Bricks (23 x11 x 7 cm) 2nd class -Non Modular

BMT-A.01

1000 Nos

4700.00

0 Km

0.00

0.00

4700.00

64

Modular Bricks 19 x 9 x 9 cms

BMT-A.02

1000 Nos

5500.00

0 Km

0.00

0.00

5500.00

65

Fly ash cement/lime solid blocks of 75 kg/sq.cm -225 x 100 x 60 mm

BMT-A.07

1000 Nos

7000.00

0 Km

0.00

0.00

7000.00

66

Fly ash cement / lime solid blocks of 50 kg/sq.cm - 290 x 225 x 140

BMT-A.10

1000 Nos

24000.00

0 Km

0.00

0.00

24000.00

67

Fly ash cement / lime solid blocks of 50 kg/sq.cm - 290 x 200 x 140

BMT-A.11

1000 Nos

19000.00

0 Km

0.00

0.00

19000.00

68

Fly ash cement / lime solid blocks of 50 kg/sq.cm - 290 x 150 x 140

BMT-A.12

1000 Nos

19000.00

0 Km

0.00

0.00

19000.00

69

Fly ash cement / lime solid blocks of 50 kg/sq.cm - 290 x112/100 x140

BMT-A.13

1000 Nos

11000.00

0 Km

0.00

0.00

11000.00

70

DI pipes

71

BWSC Pipes

The aggregate rates are inclusive of blasting charges of Rs.70/cum and 25% machine crushing charges. However , if the metal is obtained from hand broken , the blasting and crushing charges shall be
deducted. The aggregate shall be HB Stone of Granite, Dolamite, Dolerite and Trap.( Quartzite and Basalt with aggregate Impact of Less than 20)

Seignorage charges vide GO Ms.No.198, Dt. 13-8-2009

337269598.xlsx C-Mat

Page 94 of 3205

Kandukur Municipality
DATA - ALL PIPE LINE WORKS RELATED TO WATER SUPPLY AND SEWERS
Data Based on 2015-16 SSR
20/02/16

DATA - WATER SUPPLY

Sn.
Description
Quantity
Rate
Unit
Amount
1 Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam and stacking of excavated materials for
pipe line trench work. as directed by the departmental officers.
Rate as per PH SSR item no 25a, Pg.6
1 Sqm
656.00
10 Sqm
65.60
Add for Municipal Allowance at
20%
13.12
Overheads & Contractors Profit
13.615%
10.72
Total
89.44
VAT & Labour cess.
0%
0.00
Rate per 1 Sqm
Rs
89.44
2

Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the departmental officers.
Rate as per PH SSR item no 25b,Pg.6
Add for Municipal Allowance at

1 Cum
20%
13.615%

Overheads & Contractors Profit

Total
VAT & Labour cess.

1822.00

Rs

Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe line trench work. as directed by the departmental
officers.
Rate as per PH SSR item no 25 c,Pg.6
Add for Municipal Allowance at
Overheads & Contractors Profit
Total
VAT & Labour cess.

1 Cum
20%
13.615%

224.00

a
b
5

a
b

1 Cum

224.00
44.80
36.6
305.40
0.00
305.40

0%
Rate per 1 Cum

1822.00
364.40
297.68
2484.08
0.00
2484.08

0%
Rate per 1 Cum

1 Cum

Rs

RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line
trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying
sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead
of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
up to 3.00 Mts depth below GL
out put
10.00 Cum
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
375.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
3.64 Nos.
320.00
Add for Municipal Allowance at
20%
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches & Foundations @
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

1 Each
1 Each

13.615%
75%

0%
Rs
5%
Rs

0.00
1164.80
232.96
1397.76
190.31
1048.32
2636.39
263.64
0.00
263.64
13.18
276.82

RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line
trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the
existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water
lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m,
including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


up to 3.00 Mts depth below GL
out put
240.0 Cum
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
375.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
8.32 Nos.
320.00
Add for Municipal Allowance at
20%
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
6.00 hours
2791.00
Sub total
c&d) Overheads & Contractors Profit
13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering
337269598.xlsx - data-WS New

1 Each
1 Each

0.00
2662.40
532.48

1 hours

16746.00
19940.88
2714.95
22655.83
94.40
0.00
94.40
4.72
99.12

Rs
Rs

Page 95 of 3205

RBR-FNDN-1- (II-B) - Ordinary rock (not requiring blasting) -up to 3.00Mts. below GL by Machanical means: Excavation in Ordinary Rock for Pipe
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer
including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas
for laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc.,
complete for Pipe Line trenches by machanical means.

Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m depth


up to 3.00 Mts depth below GL
out put

180.0 Cum

a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

Add for Municipal Allowance at

0 Nos.
6.24 Nos.
20%

375.00
320.00

1 Each
1 Each

0.00
1996.80
399.36

6.00 hours

2791.00

1 hours

16746.00
19142.16
2606.21
21748.37
120.82
0.00
120.82

b) Machinery

Hydraulic Excavator - (Hire charges R & B- S.N.4)


Sub total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
7

13.615%

0%
Rs

RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: Excavation in Hard Rock in habitant areas where conventional blasting
can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of
stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the
departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in
the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including all incidental and
operational charges etc., complete
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers ( Hire
charges- Irrigation-S.N.3)
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d+e)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering

a
b
9

10.00 Cum
0.00 Nos
5.20 Nos
20%

375.00
320.00

1 Nos
1 Nos

0.00
1664.00
332.80

6.00 hour

1145.10

1 hour

6870.60
8867.40
1207.3
10074.70
1007.47
0.00
1007.47

13.615%

0%

RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of soils up to 3.00 Mts depth below GL by manual means as
per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and
disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305
MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL
out put
10.00 Cum
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
375.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
3.64 Nos.
320.00
Add for Municipal Allowance at
20%
Sub total
c&d) Overheads & Contractors Profit
13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering

1 Each
1 Each

Rs
Rs

0.00
1164.80
232.96
1397.76
190.31
1588.07
158.81
0.00
158.81
7.94
166.75

RBR-FNDN-1- ( I-A-ii ) In ordinary soils, 3.00 Mts to 6.00Mts. depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer
including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas
for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth
upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
3.00 Mts to 6.00 Mts. depth below GL
out put
10.00 Cum
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
375.00
a) Labour
4.68 Nos.
320.00
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches @

13.615%
75%
337269598.xlsx - data-WS New

1 Each
1 Each

0.00
1497.60
1497.60
203.9
1123.20

Page 96 of 3205

Cost for 240 cum = a+b+c+d


Rate per cum = (a+b+c+d)/10

VAT & Labour cess.

b
10

0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

Rs
0%
Rs

2824.70
282.47
0.00
282.47
0.00
282.47

RBR-FNDN-1- (I-B-ii) - In ordinary soils from 3.00 Mts to 6.00Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of
soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying
sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of
50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL

out put

210.0 Cum

a)Labour

a
b
11

Stone dust Filling (C-Mat-Lead statement-S.No.23)


b) Labour
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

0 Nos.
8.32 Nos.

375.00
320.00

1 Each
1 Each

0.00
2662.40

6.00 hours

2791.00

1 hours

16746.00
19408.40
2642.45
22050.85
105.00
0.00
105.00
0.00
105.00

13.615%

0%
Rs
0%
Rs

RBR-FNDN-1- ( I-A-iii ) In ordinary soils, above 6.00Mts. depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line
trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying
sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead
of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
Above 6.00 Mts. depth below GL
out put
10.00 Cum
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
375.00
b) Labour
6.24 Nos.
320.00
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches @
Cost for 240 cum = a+b+c+d

1 Each
1 Each

13.615%
75%

Rate per cum = (a+b+c+d)/10

VAT & Labour cess.


a
b
12

a
b

0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

Rs
5%
Rs

0.00
1996.80
1996.80
271.86
1497.60
3766.26
376.63
0.00
376.63
18.83
395.46

RBR-FNDN-1- (I-B-iii) - In ordinary soils above 6.00Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying
sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of
50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL
out put
180.0 Cum
a)Labour
Stone dust Filling (C-Mat-Lead statement-S.No.23)
0 Nos.
375.00
b) Labour
10.40 Nos.
320.00
Add for Municipal Allowance at
20%
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
6.00 hours
2791.00
Sub total
c&d) Overheads & Contractors Profit
13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering

337269598.xlsx - data-WS New

1 Each
1 Each

0.00
3328.00
665.60

1 hours

16746.00
20739.60
2823.7
23563.30
130.91
0.00
130.91
6.55
137.46

Rs
Rs

Page 97 of 3205

13

PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost and conveyance of all materials, labour
charges and removal of shoring and shuttering at appropriate places as directed by the departmental officers with all incidental and ooperational charges
etc, complete.

Single staging from 0 to 8-0 ( 0 to 2.5 Metre)


Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M deep.
Area = 30 x 1.5 = 45 sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi skilled-S.N.17)

0.570 day

375.00

1 day

213.75

Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at
b) Material
Polling boards and ballies
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 x 0.038) (Pg.310 of Irri.SSR-Sn.-47-Pg.13 Jungle wood planks)

1.100 day
20%

320.00

1 day

352.00
113.15

0.110 cum

23000.00

1 cum

2530.00

Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 4 x 1.5

0.160 cum

3825.00

1 cum

612.00

sqm

BMC-X.05- Pg.No.104 of Bld.SSR-Casuarina Balli Props - 3" to 4"


dia - 12'-0" Height( Approx 9 Nos of Ballies equals to 0.16Cum, cost
of each balli =Rs. 68 (9x68 =612 )or 3825 for 1 Cum
DeductCredit for materials after use @ 80% of the cost of materials
=0.8 x X
c) Machinery
Total
Overheads & Contractors Profit
(d) Cost for 45 sqm (a+b+c)
Rate per each sqm = d/45
VAT & Labour cess.

-628.40

13.615%

3192.50
434.66
3627.16

0%

80.60
0.00
80.60

Rate per 1 Sqm


b

Double staging from 8 to 14 ( 2.5 to 4.5 Metre)


Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M deep.
Area = 30 x 1.5 = 45 Sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi skilled-S.N.17)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at
b) Material
Polling boards and ballies
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 x 0.038 = 0.57
cum)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 4 x 1.5 = 1.1 cum

0.500 day

375.00

1 day

187.50

1.320 day
20%

320.00

1 day

422.40
121.98

0.110 cum

23000.00

1 cum

2530.00

0.220 cum

3825.00

1 cum

841.50

sqm

BMC-X.05- Pg.No.104 of Bld.SSR-Casuarina Balli Props - 3" to 4"


dia - 12'-0" Height( Approx 9 Nos of Ballies equals to 0.16Cum, cost
of each balli =Rs. 68 (9x68 =612 )or 3825 for 1 Cum
DeductCredit for materials after use @ 80% of the cost of materials
=0.8 x X
c) Machinery
Total
Overheads & Contractors Profit
(d) Cost for 45 sqm (a+b+c)

3429.08
13.615%

Rate per each sqm = d/45


VAT & Labour cess.
14

-674.30

466.87
3895.95

86.58
0.00
Rate per 1 Sqm
86.58
PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6-0 (2 Meter) below
G.L
0%

Taking output 3 Rmt


Material
Bamboos of 1 dia 2.5 M long (5 ft c/c = 3 x 2.5) - BMC-X.12
-Sl.No.1024, Pg.104 of Bld.SSR
Bamboos of 1 dia 3.66 M long (5 ft c/c = 3x 3.66) - BMC-X.12
-Sl.No.1024, Pg.104 of Bld.SSR
Cost of Bamboos
(a) Usage of Material 5 times. Thus Cost of Material taken as 20%
(b) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at
(c) Sundries for Coir rope, nails, @ 1%
(d) Sundries for lighting and watching etc at 1%
Overheads & Contractors Profit
Cost for 3rmt (a+b+c+d)
Rate per each rmt = (a+b+c+d)/3
VAT & Labour cess.

7.50 rmt

130.00

2.44 rmt

399.59

10.98 rmt

130.00

2.44 rmt

585.00
984.59
196.92

0.500 day
20%

13.615%

0%
337269598.xlsx - data-WS New

320.00

1 day

160.00
32.00
3.57
3.57
396.06
53.92
449.98
149.99
0.00

Page 98 of 3205

Rate per 1 Rmt


16

149.99

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Sand from approved quarry to work site and stacking at work site to Dept. gauge for
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9
MORD & 304 MORTH
out put

Sand Filling

1.00 Cum

a) Material
Water

1.00 Cum
0.10 Kl

1001.81
103.00

1 Cum
1 Kl

1001.81
10.30

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

0.00 Nos
0.31 Nos
20%

375.00
320.00

1 Nos
1 Nos

0.00
99.20
19.84
1131.15
154.01
1285.16
1285.16
0.00
1285.16

Stone dust Filling (C-Mat-Lead statement-S.No.23)

Sub Total
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & Labour cess.

13.615%

0%

Rate per 1 Cum

18

BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers
not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at
Sub Total
b)Material
Water
c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess

6.00 Cum
0.00 Nos
3.12 Nos
20%

0.72 kl
13.615%

375.00
320.00

1 Nos
1 Nos

0.00
998.40
199.68
1198.08

103.00

1 kl

74.16
163.12
1435.36
239.23
0.00
239.23

0%
Rate per 1 Cum

19

Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges,
all leads & lifts and other incidental and operational charges etc., complete.

Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km
VAT & Labour cess.

1 cum
0%

52.80

1 Cum

Rate per 1 Cum


b

Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km
VAT & Labour cess.

1 cum
0%

51.70

Rs

51.70
0.00
51.70

1 Cum

Rate per 1 Cum


20

Rs

52.80
0.00
52.80

Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper etc,
complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH items)

1 Hp.hr

Total
Overheads & Contractors Profit

53.00

1 Hp.hr

53.00
Rs

53.00
7.22
60.22
0.00

Rs

60.22

13.615%

VAT & Labour cess.

0%
Rate per 1HPhr

26

Providing temparary water supply house service connections with ISI mark GI pipes and fittings so as not to disturb the existing water supply connections
during earth work excavation for trenches and during laying of new mains in including cost and conveyance of all materials, labour charges and with all
incidental and operational charges etc., complete.

15mm Nominal bore GI pipe water supply line


S & F 15 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.67,Sn.278)
-2014-15 SSR
Add Municipal Allowence labour charges( as per -BMW-F.68 Sn.269) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2014-15- SSR item
ELEC-1.2.23, Sn.74

1 Rmt

20%
1 Rmt

1 Rmt

167.00

41.00
3.70

8.20
1 Rmt

3.70

13.615%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

28

167.00

Rs

178.90
24.36
203.26
0.00
203.26

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

337269598.xlsx - data-WS New

Page 99 of 3205

Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1


Coarse aggregate 40mm graded ( C-Mat- S.No-57)

129.60 Kg
0.90 Cum

5.740
1489.81

1 Kg
1 Cum

743.90
1340.83

0.45 Cum
1.20 Kl

791.93
103.00

1 Cum
1 Kl

356.37
123.60

1 hour

338.60

1 hour

338.60

Mason 1st class (labour-Irrigation.S.N.11)

0.10 Nos

420.00

1 Nos

42.00

Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

1.39 Nos
20%

320.00

1 Nos
Rs

444.80
97.36
3487.46

Rs

474.82
3962.28

Fine aggregate (Sand) ( C-Mat-S.N.2 )


Water (including for curing) -M-189-b. irrigation SSR
B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)


C. LABOUR:

Sub- Total

d) Overheads & Contractors Profit

13.615%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum
29

0%

0.00
3962.28

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57)

162.00 Kg
0.90 Cum

5.74
1489.81

1 Kg
1 Cum

929.88
1340.83

Fine aggregate (Sand) ( C-Mat-S.N.2 )


Water (including for curing) -M-189-b. irrigation SSR

0.45 Cum
1.20 Kl

791.93
77.00

1 Cum
1 Kl

356.37
92.40

1 hour

338.60

1 hour

338.60

Mason 1st class (labour-Irrigation.S.N.11)

0.10 Nos

420.00

1 Nos

42.00

Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

1.39 Nos
20%

320.00

1 Nos
Rs

444.80
97.36
3642.24

Rs

495.89
4138.13

Rs

0.00
4138.13

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)


C. LABOUR:

Grand Total

Overheads & Contractors Profit

13.615%
Rate per cu.m.

VAT & Labour cess.


Rate per 1 Cum
31

0%

BLD-CSTN -3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 (Cement : fine aggregate: coarse aggregate )
using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement
PCC -M-20

330.00 Kg
0.90 Cum

5.74
1854.81

1 Kg
1 Cum

1894.20
1669.33

Sand (C-Mat-Lead statement-S.No.1)


Water (including for curing) -M-189-b. irrigation SSR

0.45 Cum
1.20 Kl

791.93
77.00

1 Cum
1 Kl

356.37
92.40

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.10 Nos.
1.39 Nos.

420.00
320.00

1 Each
1 Each

42.00
444.80

Add for Municipal Allowance at


Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)

20%
1.00 hour

338.60

1 hour

97.36
338.60
4935.06

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

20mm HBG graded metal- ( as per Lead S.No-49)

VAT & Labour cess.

0%
BASIC COST per 1 cum

Rs

Pedastals / Thrust blocks/ Anchor blocks


P.C.C. - M-20 Per Cum

1.00 Cum

4935.06

1 Cum

4935.06

Centering charges ,Pg No. 84 to 89 of Bld. Items


Labour charges,Pg No. 84 to 89 of Bld. Items

1.00 Cum
1.00 Cum

315.00
710.00

1 Cum
1 Cum

315.00
710.00

Add Labour component @

20%

Overheads & Contractors Profit

142.00
6102.06
830.8

13.615%
Total

Rate per One Cum


b

0.00
4935.06

Rs

6932.86
6932.86

CC (1:2:4) walls of ----mm thick ness


P.C.C. - M-20 Per Cum

0.20 m
1.00 Cum

4935.06

1 Cum

4935.06

Centering charges rate s per Sl. No. Q of page No.7- Sn. 31.b.4

5.00 Sqm

876.00

1 Sqm

4380.00
Rs

Overheads & Contractors Profit

13.615%
Total

VAT & Labour cess.


Rate per One Cum

0%
Rs
337269598.xlsx - data-WS New

9315.06
1268.25
10583.31
0.00
10583.31

Page 100 of 3205

P.C.C. - M-20 for 0.910 Mts at bottom,0.53 at top, 100mm thick


ring of 1.00 m height with nomonal reinforcement
Qty of Ring = x(((0.552 -0.452)+(0.382-0.282))/2 x 1
Basic Rate per Cum.
Centering Charges for Bed Blocks and Bands

0.33 Cum
0.33 Cum

4935.06
61.00

1 Cum
1 Cum

1628.57
20.13

Labour charges
Add Labour component @

0.33 Cum
20%

230.00

1 Cum

75.90
15.18

add steel @ 50 Kg/ Cum (cost excluding 14% CP)


Total
Overheads & Contractors Profit

16.50 Kg

1 Kg
Rs

13.615%

VAT & Labour cess.


Rate per each ring
d

45.84

0%
Rs

Basic Rate of CC (1:2:4) -1.0x0.45 x0.075

0.034 Cum

4935.06

1 Cum

166.56

Add Centering charges


add steel @ 75 Kg/ Cum

0.034 Cum
2.53 Kg

160.00
45.84

1 Cum
1 Kg

5.40
115.98

Total

287.94
39.2

13.615%

Rate per each slab of 1.00m x 0.45m- 0.1m thick

Rs.

327.14

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse aggregate )
using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the
required level curing etc., complete for finished item of work with nomonal reinforcement for Road restoration.

PCC -M-30
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)
Overheads & Contractors Profit

400.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
0.10 Nos.
1.39 Nos.
20%
1.00 hour

5.74
1854.81
791.93
77.00
420.00
320.00

1 Kg
1 Cum
1 Cum
1 Kl
1 Each
1 Each

338.60

1 hour

13.615%
BASIC COST per 1 cum

33

0.00
2835.99

Supply & fixing CC (1:2:4) cover 1.00m x 0.45 m in panels with


nominal reinforcement 100mm thick and hooks for lifting

Overheads & Contractors Profit

32

756.36
2496.14
339.85

Rs

2296.00
1669.33
356.37
92.40
42.00
444.80
97.36
338.60
5336.86
726.61
6063.47

BLD-CSTN-3-12-(29) Using Concrete mixture : Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement : fine aggregate: coarse aggregate ) using
20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc.,
to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

5.74
1489.81
791.93
77.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1340.83
356.37
92.40
338.60

420.00
320.00

1 day
1 day

42.00
444.80
4509.20
613.93
5123.13
0.00
5123.13

B. LABOUR:

0.10 day
1.39 day

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

Sub - Total
c.Overheads & Contractors Profit
Grand Total
VAT & Labour cess.
Rate per 1 Rmt
34

Rs
13.615%
0%

BLD-CSTN-3-13-(30)-C ; RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of
work, but excluding centering, shuttering . for RCC SLABS, BEAMS
RCC SLABS, BEAMS -WOODEN SCAFFOLDING
A. MATERIALS:
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Sub Total of - A
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Add for Municipal Allowance at

0.90 cum
0.45 cum
400.00 Kgs

1854.81
791.93
5.74

1 Cum
1 Cum
1 Cum

1669.33
356.37
2296.00
4321.70

0.067 day
0.133 day
2.500 day
20%

420.00
375.00
320.00

1 Cum
1 Cum
1 Cum

28.14
49.88
800.00
175.60

337269598.xlsx - data-WS New

Page 101 of 3205

Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)
Vibrator hire
charges ( Hire charges-irrigation. Sn.41)
Water (including for curing) -M-189-b. irrigation SSR
Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit
Total
VAT & Labour cess.
Rate per One Cum
a

for pre cast/ Cast-in-situ Chamber cover not exceeding 0.45m


width with hooks for lifting

ii

RCC M 20 Slabs

1053.62
0.267 hour
0.267 hour
1.200 kl

1 Cum
1 hour
1 Cum

13.615%
0%
Rs

250 mm

R.C.C. M 20 nominal mix Per Cum


Centering charges ,Pg No.106 to 108
Labour charges,Pg No.106 to 108
Add Labour component @

338.60
175.40
77.00

1.00 Cum
4.00 Sqm
4.00 Sqm
20%

Thick

0.25 m
5604.96
152.00
121.00

1 Cum
1 Sqm
1 Sqm

Sub - Total
Overheads & Contractors Profit

Rs
13.615%

Total
VAT & Labour cess.
Rate per One Cum
35

0.15 Cum

3045.08

1 Cum

456.76

0.60 Nos
0.96 Nos
20%

420.00
320.00

1 Nos
1 Nos

252.00
307.20
111.84
1127.80
153.55
1281.35
0.00
1281.35

13.615%
0%
Rs

0.21 Cum

3733.88

1 Cum

0.94 Nos
0.16 Nos
20%

420.00
320.00

1 Nos
1 Nos

784.11

13.615%
0%
Rs

394.80
51.20
89.20
1319.31
179.62
1498.93
0.00
1498.93

BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per
bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab
etc,, complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3
Water proof compound -BMT-H.01- item no.241
B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Add for Municipal Allowance at
Total
over heads & contractors profit
Total cost for 10 sqm
VAT & labour cess
Rate per 10 Sqm

38

Rs

BLD-CSTN-8-8-(83) : Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site,
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Add for Municipal Allowance at
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & labour cess
Rate per 10 Sqm

37

0%

5604.96
608.00
484.00
96.8
6793.76
924.97
6803.71
0.00
6803.71

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage
charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary
etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Add for Municipal Allowance at
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & Labour cess.
Rate per 10 Sqm

36

90.41
46.83
92.40
229.64
5604.96
763.12
6368.08
0.00
6368.08

0.210 Nos
2.000 Kg

3733.88
52.00

1 Nos
1 Kg

784.11
104.00

0.660 Nos
1.540 Nos
3.70 Nos
20%

420.00
375.00
320.00

1 Nos
1 Nos
1 Nos

277.20
577.50
1184.00
407.74
3334.55
454
3788.55
0.00
3788.55

Rs
13.615%
0%
Rs

BLD-CSTN-9-5: White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for
finished item of work, but excluding conveyance charges of materials
Whiting / White Cement -BMS-W.68-item-1012

2.00 Kg
337269598.xlsx - data-WS New

29.00

1 Kg

58.00

Page 102 of 3205

Gum, conjee water, or prickly pear juice including necessary fire wood
Brick Layers / Painter ( labour - Irri-Skilled-Sn.11)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Add for Municipal Allowance at

LS
0.21 Nos
0.32 Nos
20%

Sundries including brushes, ladders, etc.,

10.00
420.00
320.00

1 Nos
1 Nos

1%
Rs

over heads & contractors profit


Sub-Total
VAT & labour cess
Rate per 10 Sqm
40

13.615%
0%
Rs

88.20
102.40
38.12
296.72
2.97
299.69
40.8
340.49
0.00
340.49

BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500
grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage

1.05 Ton

Binding wire- SSR (Irrigation) item No 3, Pg 11


B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled-Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at
Sundries on Material

34000.00

1 Ton

35700.00

6.00 kg

70.00

1 kg

420.00

10.00 day
10.00 day
20%

490.00
320.00

1 day
1 day

4900.00
3200.00
1620.00
45840.00

(c) Overheads on (a+b)


(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
VAT & Labour cess.
Rate per One MT
Rate per One Kg
42

13.615%
1 MT
0%
Sub Total:
Rs.

6241.12
52081.12
0.00
52081.12
52.08

PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and
gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994)
Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be as per sub-analysis made for 200 mm dia CI Pipes S/s ends.

Details of cost for 5m


Lowering 80 mm dia DI pipe
Weight of 5m length = (79 +85.5 + 92)/3 = 85.5 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 100 mm dia DI pipe
Weight of 5m length = (100+109+117)/3 = 108.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 125 mm dia DI pipe
Weight of 5m length = (130+141+153)/3 = 141.33 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 150mm dia DI pipe
Weight of 5m length = (162+178+191)/3 = 177 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

85.500 Kg
13.615%

1 Kg

Rs

93.79
12.77
106.56
21.31
0.00
21.31

Rs

119.21
16.23
135.44
27.09
0.00
27.09

Rs

155.04
21.11
176.15
35.23
0.00
35.23

Rs

194.17
26.44
220.61
44.12
0.00
44.12

0%

108.670 Kg
13.615%

1.097

1 Kg

0%

141.330 Kg
13.615%

1.097

1 Kg

0%

177.000 Kg
13.615%

1.097

1 Kg

0%
Rate per each cut

1.097

Lowering 200 mm dia DI pipe


337269598.xlsx - data-WS New

Page 103 of 3205

Weight of 5m length = (237+257+278)/3 = 257.33 kgs


(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
f

Lowering 250 mm dia DI pipe


Weight of 5m length = (319+348+376)/3 = 347.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 300 mm dia DI pipe
Weight of 5m length = (412+450+487)/3 = 449.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 350 mm dia DI pipe
Weight of 5m length =(519+563+610)/3=564
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

257.330 Kg
13.615%

1.097

1 Kg

Rs

381.39
51.93
433.32
86.66
0.00
86.66

Rs

493.29
67.16
560.45
112.09
0.00
112.09

Rs

618.71
84.24
702.95
140.59
0.00
140.59

0%

347.670 Kg
13.615%

1.097

1 Kg

0%

449.670 Kg
13.615%

1.097

1 Kg

0%

564.000 Kg
13.615%

1.097

1 Kg

0%
Rate per each cut

43

Rs

282.29
38.43
320.72
64.14
0.00
64.14

PHE-JCIR-4 : Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the gasket but including all sundries filling
with water, with a water lead up to 500m and testing to required pressure, etc. complete Reference to specifications IS 3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.
Details of cost for 10 Joints
Jointing 80 mm dia DI pipe
a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

80 mm dia
0.300 day
0.800 day
20%

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

375.00
320.00

1 day
1 day

112.50
256.00
73.70
442.20

1 rm

187.00

- each
50.000 rm

3.74

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

629.20
6.29

13.615%

0%
Rate per each cut

Jointing 100 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs
100 mm dia
0.500 day
1.000 day
20%

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

375.00
320.00

1 day
1 day

187.50
320.00
101.50
609.00

1 rm

234.00

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

635.49
86.52
722.01
72.20
0.00
72.20

4.68

843.00
8.43

13.615%

337269598.xlsx - data-WS New

851.43
115.92
967.35
96.74

Page 104 of 3205

VAT & Labour cess.

0%
Rate per each cut

Jointing 125 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs
125 mm dia
0.500 day
1.000 day
20%

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

375.00
320.00

1 day
1 day

187.50
320.00
101.50
609.00

1 rm

292.50

each
50.000 rm

5.85

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

901.50
9.02

13.615%

0%
Rate per each cut

Jointing 150 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs

0.600 day
1.100 day
20%

375.00
320.00

1 day
1 day

225.00
352.00
115.40
692.40

1 rm

351.00

each
50.000 rm

7.02

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

1043.40
10.43

13.615%

0%
Rate per each cut

Jointing 200 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs

0.600 day
1.100 day
20%

375.00
320.00

1 day
1 day

225.00
352.00
115.40
692.40

1 rm

468.00

each
50.000 rm

9.36

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

1160.40
11.60

13.615%

0%
Rate per each cut

Jointing 250 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs

1172.00
159.57
1331.57
133.16
0.00
133.16

250 mm dia
0.620 day
1.200 day
20%

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

375.00
320.00

1 day
1 day

232.50
384.00
123.30
739.80

1 rm

585.00

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

1053.83
143.48
1197.31
119.73
0.00
119.73

200 mm dia

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

910.52
123.97
1034.49
103.45
0.00
103.45

150 mm dia

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

0.00
96.74

11.70

1324.80
13.25

13.615%

337269598.xlsx - data-WS New

1338.05
182.18
1520.23
152.02

Page 105 of 3205

VAT & Labour cess.

0%
Rate per each cut

Jointing 300 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs
300 mm dia
0.800 day
1.200 day
20%

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

375.00
320.00

1 day
1 day

300.00
384.00
136.80
820.80

14.04

1 rm

702.00

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

1522.80
15.23

13.615%

0%
Rate per each cut

Jointing 350 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs

0.900 day
1.500 day
20%

375.00
320.00

1 day
1 day

337.50
480.00
163.50
981.00

16.38

1 rm

819.00

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

1800.00
18.00

13.615%

0%
Rate per each cut

Rs

1818.00
247.52
2065.52
206.55
0.00
206.55

PHE-JCIF-5 : Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white
lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Reference to specifications. BIS No.3114/1994.)
Details of cost for 10 joints
80 mm dia
a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

0.090 day
0.210 day
0.800 day
20%

480.00
375.00
320.00

1 day
1 day
1 day

43.20
78.75
256.00
75.59
453.54

b) Material
Bolts and nuts 16mm dia 60mm long ( Sn.5-Table-31,Pg.82-2014-15)

6.800 kg

123.00

1 kg

836.40

Rubber insertion 5mm thick (Sn-4-Table-31,Pg.82-2014-15)

2.125 kg

103.00

1 kg

218.88

3.74

1 rm

102.85

80 mm dia

White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

1611.67
5.56

13.615%

0%
Rate per each joint

1538.03
209.4
1747.43
174.74
0.00
174.74

350 mm dia

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

44

0.00
152.02

100 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs

1617.23
220.19
1837.42
183.74
0.00
183.74

100 mm dia
0.150 day
0.350 day
1.000 day
20%
337269598.xlsx - data-WS New

480.00
375.00
320.00

1 day
1 day
1 day

72.00
131.25
320.00
104.65

Page 106 of 3205

627.90
b) Material
Bolts and nuts 16mm dia 60mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

13.600 kg
2.540 kg

123.00
103.00

1 kg
1 kg

1672.80
261.62

27.500 rm

4.68

1 rm

128.70
2691.02
7.57

13.615%

Rate per each joint


c

125 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs
125 mm dia
0.150 day
0.350 day
1.000 day
20%

b) Material
Bolts and nuts 16mm dia 60mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

480.00
375.00
320.00

1 day
1 day
1 day

72.00
131.25
320.00
104.65
627.90

13.600 kg
3.140 kg

123.00
103.00

1 kg
1 kg

1672.80
323.42

27.500 rm

5.85

1 rm

160.88

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

2785.00
7.89

13.615%

Rate per each joint


d

150 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs

2792.89
380.25
3173.14
317.31
317.31

150 mm dia
0.180 day
0.420 day
1.100 day
20%

b) Material
Bolts and nuts 20mm dia 65mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

480.00
375.00
320.00

1 day
1 day
1 day

86.40
157.50
352.00
119.18
715.08

24.000 kg
4.300 kg

123.00
103.00

1 kg
1 kg

2952.00
442.90

27.500 rm

7.02

1 rm

193.05
4303.03
9.08

13.615%

0%
Rate per each joint

2698.59
367.41
3066.00
306.60
306.60

200 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs

4312.11
587.09
4899.20
489.92
0.00
489.92

200 mm dia
0.180 day
0.420 day
1.100 day
20%

b) Material
Bolts and nuts 20mm dia 70mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

480.00
375.00
320.00

1 day
1 day
1 day

86.40
157.50
352.00
119.18
715.08

25.200 kg
6.160 kg

123.00
103.00

1 kg
1 kg

3099.60
634.48

27.500 rm

9.36

1 rm

257.40
4706.56
9.72

13.615%

0%
Rate per each joint
337269598.xlsx - data-WS New

Rs

4716.28
642.12
5358.40
535.84
0.00
535.84

Page 107 of 3205

250 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

250 mm dia
0.200 day
0.420 day
1.200 day
20%

b) Material
Bolts and nuts 20mm dia 75mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

480.00
375.00
320.00

1 day
1 day
1 day

96.00
157.50
384.00
127.50
765.00

39.600 kg
8.500 kg

123.00
103.00

1 kg
1 kg

4870.80
875.50

27.500 rm

11.70

1 rm

321.75
6833.05
10.87

13.615%

0%
Rate per each joint

300 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs
300 mm dia
0.240 day
0.560 day
1.200 day
20%

b) Material
Bolts and nuts 20mm dia 75mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

480.00
375.00
320.00

1 day
1 day
1 day

115.20
210.00
384.00
141.84
851.04

39.600 kg
10.280 kg

123.00
103.00

1 kg
1 kg

4870.80
1058.84

27.500 rm

14.04

1 rm

386.10
7166.78
12.37

13.615%

0%
Rate per each joint

350 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

Rs

0.300 day
0.600 day
1.500 day
20%

480.00
375.00
320.00

1 day
1 day
1 day

144.00
225.00
480.00
169.80
1018.80

54.400 kg
21.260 kg

123.00
103.00

1 kg
1 kg

6691.20
2189.78

27.500 rm

16.38

1 rm

450.45

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

10350.23
14.69

Rs

22.50
19.20
8.34
50.04
6.81
56.85
0.00
56.85

0%

PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains where ever required (.Dia of pipes in mm.)
Details of cost for one cutting
Cutting C.I./ DI Pipe -80 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.
Rate per each cut

Rs

10364.92
1411.18
11776.10
1177.61
0.00
1177.61

13.615%

Rate per each joint

7179.15
977.44
8156.59
815.66
0.00
815.66

350 mm dia

b) Material
Bolts and nuts 20mm dia 80mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

46

6843.92
931.8
7775.72
777.57
0.00
777.57

0.060 day
0.060 day
20%

375.00
320.00

1 day
1 day

13.615%
0%

Cutting C.I./ DI Pipe -100 mm dia


337269598.xlsx - data-WS New

Page 108 of 3205

(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.080 day
0.080 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

Cutting C.I./ DI Pipe -125 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.110 day
0.110 day
20%

375.00
320.00

Rs

112.50
96.00
41.70
250.20
34.06
284.26
0.00
284.26

0%

Cutting C.I./ DI Pipe -150 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.150 day
0.150 day
20%

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

Cutting C.I./ DI Pipe -200 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.200 day
0.200 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 250 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.250 day
0.250 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

Rs

93.75
80.00
34.75
208.50
28.39
236.89
0.00
236.89

13.615%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

Rs

75.00
64.00
27.80
166.80
22.71
189.51
0.00
189.51

1 day
1 day

Rate per each cut

Rs

56.25
48.00
20.85
125.10
17.03
142.13
0.00
142.13

0%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

Rs

41.25
35.20
15.29
91.74
12.49
104.23
0.00
104.23

13.615%

Rate per each cut


c

Rs

30.00
25.60
11.12
66.72
9.08
75.80
0.00
75.80

Cutting C.I./ DI Pipe - 300 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.300 day
0.300 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

47

Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through specialized pipe jacking method by erecting the
equipment to true to the alignment and gradient, by hydraulic pipe jacking technique complete including tunneling, excavation in all types of soils including
hard rock and construction of RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other required materials but
excluding cost of encasing pipe, in co-ordination with the concerned authorities as per approved drawings and directed by the Engineer-in Charge.

800 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 800 mm dia MS pipe-10mm thick
Overheads & Contractors Profit
VAT & Labour cess.
Rate per 1 Rmt

49

1 Rmt
1 Rmt
13.615%
0%

26000.00
16487.49

1 Rmt
1 Rmt

26000.00
16487.49
42487.49
5784.67
48272.16
0.00
48272.16

Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long 16mm dia cold twisted deformed steel Anchor rods with 0.75m length driven
in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials, machinary, labour, drilling and
cleaning hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.
Unit - 10 Nos

16 mm dia

A) MATERIALS
337269598.xlsx - data-WS New

Page 109 of 3205

16mm dia Steel (including 5% Wastage) 10 Nos of 1.50m length

23.70 Kg

38.00

1 Kg

Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141 - R


& B SSR-2013-14 ( 10Nos x 0.75m)

7.5 Rmt

154.00

1 Rmt

1155.00

Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg No.
19 - R & B SSR-2013-14 ( 10Nos x 0.75m)

7.5 Rmt

97.00

1 Rmt

727.50

0.50 day
0.50 day
1.00 day
20%

490.00
375.00
320.00

1 day
1 day
1 day

245.00
187.50
320.00
150.50
3686.10
368.610
368.61
0.00
368.61

B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Add for Municipal Allowance at
Rate per 10 Nos
Rate per 1 Nos

Rs
Rs
Rs

Rate per Each

VAT & Labour cess.


Rate per 1 No
b

0%

Unit
100 Rmt

HDPE Service Line - with 110mm dia -PE.100, 6Kg pipe

Rate of 110mm OD -HDPE 6 Kg/Sqcm -PE-100 pipe as per work


sheet
Earth work Excavation -100 x 0.5 x1.10
Sand Bedding : 100 x 0.5 x 0.10
Lowering and Jointing Charges
Rate per 100 Rmt
Rate per 1 Rmt
Add for Specials and fittings etc at 2%

100 m

55.00 Cum
5.00 Cum
100.00 Rmt

VAT & Labour cess.


Rate per 1 Rmt
50

900.60

399.91

1 Rmt

39990.50

120.82
1285.16
68.40

1 Cum
1 Cum
1 Rmt

6645.10
6425.80
6840.00
59901.40
599.01
12.00
611.01
0.00
611.01

0%

Shifting and errection of electric poles, telephone poles coming across the proposed alignment of the pipeline including cost and conveyance of all material
and all labour charges etc,. Complete.
Removal of telephone/electric poles
1 No
186.94
1 No
186.94
PSCC Pole (8.0 m) - 140 Kg WL (as per electrical cost data (APSEB)
1 No
2585.00
1 No
2585.00
for the year 2013-14 under centralised material for RE and
distribution works vide Pg.1-5, S.N-14)
CC (1:4:8) for foundation (pi x r2 x h ) = 3.14 x (0.30)2 x 0.75
CC (1:2:4) for support above GL (pi x r2 x h ) = 3.14 x (0.25)2 x 0.50

0.21 Cum
0.10 Cum

Erection charges of Electrical pole

4138.13
6932.86

1 Cum
1 Cum

869.01
693.29
4334.24
337.2
4671.44

LS
Rate per each

51

Shifting of under ground cables coming across the proposed alignment of the pipeline including Earth work excavation, shifting of cables and backfilling
etc, complete.
RBR-FNDN-1- (i-B) - EWE In ordinary soils, by Mechanical means
per 1 Rmt - 1 x0.45 x 0.75 = 0.3375 cum

0.3375 Cum

Labour charges for shifting the cable and repairs etc

120.82

1 Cum

40.78

LS

12.23

Rate per 1 Rmt


52

53.01

Manufacturing ,Supplying and errection of air valve gaurd cabins of size 0.90 x0.90 x 0.90 m made with 4 nos vertical and 8 nos horizontal MS flats of size
50x8 mm and 12mm dia MS round bars fixed at 7.5 cm c/c with door and locking arrangements as per approved drawing and as directed by the
departmental officers and painting both sides with anti corrossive paint two coats over one coat of primery coat including cost of all materials ,
fabrication ,welding , transportation to site, all taxes and duties,fixing in position duly embedding in CC(1:3:6) prop , and all other incidental and operational
charges etc complete for finished item of work.
MS flats of size 50 x 8mm @39.20Kg/Sqm
Horizontals
Vericals including 0.45m legs
12mm dia MS bars at 10cm c/c @ 0.89Kg / Rmt (0.90 / 0.075 = 12 Nos)

8
4

Painting with synthetic enamyl paint


Earth work
CC (1:2:4)
Abstract
Cost of MS Angles
Cost of MS Rods
Add fabrication charges - BMM-V.14.

0.95 0.05
1.40 0.05
12 0.90

5
4
4

0.40 0.40
0.40 0.40

39.20
39.20
0.89

0.90

14.90 Kg
10.98 Kg
48.06 Kg

0.90
0.50
0.50

4.05 Sqm
0.32 Cum
0.32 Cum

25.88 Kg
48.06 Kg
73.94 Kg

38.00
38.00
22.00

1 Kg
1 Kg
1 Kg

983.44
1826.28
1626.68

Add Municipal allowence on Labour component


Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position - BMM-V.14.

20%
73.94 Kg

4.00

1 Kg

325.34
295.76

Add Municipal allowence on Labour component


Painting with synthetic enamyl paint
Earth work
CC (1:3:6)
Add for Locking arrangements,Transport , etc.

20%
12.96 Sqm
0.32 Cum
0.32 Cum

c&d) Overheads & Contractors Profit

41.97
139.78
4178.10

1 Sqm
1 Cum
1 Cum

13.615%

VAT & Labour cess.

0%
Total

337269598.xlsx - data-WS New

Rs

59.15
543.93
44.73
1336.99
176.00
7218.30

982.77
8201.07
0.00
8201.07

Page 110 of 3205

65

Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and horizontals fixed at 25 cm c/c as per
aprooved drawing and as directed by the departmental officers and painting both sides with anti corrosive paint two coats over one coat of primary coat
including cost of all materials fabrication, welding transportation to site, all taxex and duties, fixing in position duly embodying in CC (1:1.5:3) prop., and all
other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 4.42 kg/Rmt =

61.05 kg

total

61.05 kg

Cost of MS channels ( Rate of steel as per ENC-(PH),memo )

61.05 kg

38.00

1 kg

2319.90

fabrication charges, Item-BMM-V.14-934


add Labour allowence on fabrication
Hoisting and fixng in position
Painting with synthetic enamel paint aera = 17 x 0.2

61.05 kg
20%

22.00

1 Kg

1343.10
268.62

419.65

10 Sqm

2.90 sqm

121.70

Rate for 4.00 Rmt


VAT & labour cess

4053.32
0.00
4053.32

0%

for 1.00 Rmt


Rate per 1.00 Rmt
Rate per 1.00 Kg
69

Rs.
Rs.

1013.33
1013.33
66.39

BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate: coarse
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in layers, finishing to required
level, curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum

A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm Graded Metal (C-Mat- Sn.49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Add for Municipal Allowance at
Total
Overheads & Contractors Profit
Total
VAT & labour cess

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

5.74
1854.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

1894.20
1669.33
356.37
123.60

1 hour

338.60

1 hour

338.60

0.10 Nos
1.39 Nos
20%

420.00
320.00

1 Nos
1 Nos

42.00
444.80
97.36
4966.26
676.16
5642.42
0.00
5642.42

Rs
13.615%
0%
Rate per cu.m.

73

Rs

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site,
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Add for Municipal Allowance at
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & labour cess
Rate per 10 Sqm

0.15 Cum

3733.88

1 Cum

560.08

0.60 Nos
0.96 Nos
20%

420.00
320.00

1 Nos
1 Nos

252.00
307.20
111.84
1231.12
167.62
1398.74
0.00
1398.74

13.615%
0%
Rs

80

Excavation of trenches for infiltration galleries, syphon lines and connecting mains in all soils under water including all leads, lifts, shoring, strutting, bailing
out water and removal of shoring and strutting materials, after completion of pipe line work.

item No.30 of PH SSR


0.00 Mts to 1.00 Mts depth below GL
Basic Rate as per PH SSR item No. 29, Pg.7
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

out put

10.00
10 Cum

Cum
11671.00

10 Cum

Rs

11671.00
1589.01
13260.01
1326.00
0.00
1326.00

Rs

16717.00
2276.02
18993.02
1899.30
0.00
1899.30

13.615%

0%

1.00 Mts to 2.00 Mts depth below GL


Basic Rate as per PH SSR item No. 30
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

out put

2.00 Mts to 5.00 Mts depth below GL


Basic Rate as per PH SSR item No. 30
Overheads & Contractors Profit
Cost for 10 cum

out put

10.00
10 Cum

Cum
16717.00

10 Cum

13.615%

0%
10.00
10 Cum

13.615%

337269598.xlsx - data-WS New

Cum
25092.00

10 Cum

25092.00
3416.28
28508.28

Page 111 of 3205

Rate per cum =/10


VAT & labour cess etc,.
Rate per 1 Cum
d

Beyond 5 m deep under water for every additional 1 m depth


over item 'c'
5.00 Mts to 6.00m
for extra depth beyond 5.00 Mts
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

Depth

Rs

25092.00
4794.00
29886.00
4068.98
33954.98
3395.50
0.00
3395.50

Rs

25092.00
9588.00
34680.00
4721.68
39401.68
3940.17
0.00
3940.17

6.00 m

10 Cum
1.00 Mts

25092.00
4794.00

10 Cum
1 Mts

13.615%

0%

Beyond 5 m deep under water for every additional 1 m depth


over item 'c'
6.00 Mts to 7.00m
for extra depth beyond 5.00 Mts
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

Rs

2850.83
0.00
2850.83

0%

Depth

7.00 m

1 Cum
2.00 Mts

25092.00
4794.00

1 Cum
1 Mts

13.615%

0%

Beyond 5 m deep under water for every additional 1 m depth


over item 'c'

Depth

8.00 m

81

Laying and jointing perforated RCC pipes inclusive of bailing out water and jointing with cement fillets and all other incidental charges for infiltration gallery
inclusive of bailing out water by pumping to keep the trench reasonably dry to facilitate the work excluding cost of perforated pipes and collars.

Dia of the pipe in mm


Rate as per the PH SSR item No. 30 for every
Overheads & Contractors Profit
Total
VAT & labour cess etc,.

300 mm
25 mm

36.00

1 Rmt

0%
Rate per 1 Rmt

Dia of the pipe in mm


Rate as per the PH SSR item No. 30 for every
Overheads & Contractors Profit
Total
VAT & labour cess etc,.

Rs
600 mm
25 mm

36.00

1 Rmt

0%

Dia of the pipe in mm


Rate as per the PH SSR item No. 30 for every
Overheads & Contractors Profit
Total
VAT & labour cess etc,.

Rs
700 mm
25 mm

36.00

1 Rmt

0%
Rs

out put

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

6.00 Cum

6.00 Cum

1489.81

1 Cum

8938.86

0.00 Nos
0.31 Nos
20%

375.00
320.00

1 Nos
1 Nos

0.00
99.20
19.84
9057.90
1233.23
10410.17
1735.03
1735.03

Sub Total
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

13.615%

Rate per 1 Cum

RBR-FNDN-2 ; Collection ,Supply and filling of 20 to 12mm metal from approved quarry to work site and stacking at work site to Dept. gauge for
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications.
out put

20 to 12mm Metal Filling


a) Material
20 to 12mm size HG metal ( C-Mat- Sn. 47 )

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

6.00 Cum

6.00 Cum

1854.81

1 Cum

11128.86

0.00 Nos
0.31 Nos
20%

375.00
320.00

1 Nos
1 Nos

0.00
99.20
19.84
11247.90
1531.4
12898.34
2149.72
2149.72

Sub Total
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

13.615%

Rate per 1 Cum

85

1145.24

RBR-FNDN-2; Collection ,Supply and filling of 40 mm metal from approved quarry to work site and stacking at work site to Dept. gauge for
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications.
40 mm Metal Filling
a) Material
40mm size HG metal ( C-Mat - Sn. 57)

84

981.63
1008.00
137.24
1145.24
0.00

13.615%

Rate per 1 Rmt


83

864.00
117.63
981.63
0.00

13.615%

Rate per 1 Rmt

432.00
60.48
492.48
0.00
492.48

RBR-FNDN-2: Collection ,Supply and filling of 12 to 6 mm metal from approved quarry to work site and stacking at work site to Dept. gauge for
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications.
12 to 6 mm Metal Filling

out put
337269598.xlsx - data-WS New

6.00 Cum

Page 112 of 3205

a) Material
12 to 6mm size HG metal ( C- Mat - Sn . 42 )

6.00 Cum

1519.81

1 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

0.00 Nos
0.31 Nos
20%

375.00
320.00

1 Nos
1 Nos

Sub Total
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

13.615%

Rate per 1 Cum

86

out put

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

1.00 Cum

1.00 Cum
0.10 Cum

641.93
103.00

1 Cum
1 Cum

641.93
10.30

0.00 Nos
0.31 Nos
20%

375.00
320.00

1 Nos
1 Nos

0.00
99.20
19.84
771.27
105.01
995.32
995.32
0.00
995.32

Sub Total
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess etc,.

13.615%

0%

Rate per 1 Cum

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Fine Sand from approved quarry to work site and stacking at work site to Dept. gauge for
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9
MORD & 304 MORTH
out put

Fine sand Filling


a) Material
Fine sand ( C- Mat - Sn. 2)
Water

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

1.00 Cum

1.00 Cum
0.10 Cum

791.93
103.00

1 Cum
1 Cum

791.93
10.30

0.00 Nos
0.31 Nos
20%

375.00
320.00

1 Nos
1 Nos

0.00
99.20
19.84
921.27
125.43
1165.74
1165.74
0.00

Sub Total
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess etc,.

13.615%

0%

1165.74

Rate per 1 Cum

88

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Filter Media Sand from approved quarry to work site and stacking at work site to Dept. gauge for
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9
MORD & 304 MORTH
out put

Filter media Filling


a) Material
Filter media ( C- Mat - Sn. 14)
Water

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at

1.00 Cum

1.00 Cum
0.10 Cum

989.81
103.00

1 Cum
1 Cum

989.81
10.30

0.00 Nos
0.31 Nos
20%

375.00
320.00

1 Nos
1 Nos

0.00
99.20
19.84
1119.15
152.37
1390.56
1390.56
0.00
1390.56

Sub Total
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess etc,.

13.615%

0%

Rate per 1 Cum

95

0.00
99.20
19.84
9237.90
1257.74
10614.68
1769.11
1769.11

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Coarse Sand from approved quarry to work site and stacking at work site to Dept. gauge for
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9
MORD & 304 MORTH
Coarsed sand Filling
a) Material
Coarsed sand ( C- Mat - Sn. 1)
Water

87

9118.86

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.146/Cement&Steel / T1 /
Coarse aggregate 40mm graded ( as per Lead statement. Sn.35)

162.00 Kg
0.90 Cum

5.740
1311.81

1 Kg
1 Cum

929.88
1180.63

Fine aggregate (Sand) ( Lead statement-S.N.2 )

0.45 Cum

791.93

1 Cum

356.37

Water (including for curing) -M-189- SSR- irrigation items

1.20 Kl

103.00

1 Kl

338.60

1 hour

B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)

1 hour

123.60
2590.48
338.60
338.60

C. LABOUR:
Mason 1st class(labour-Irrigation.S.N.11)

0.10 Nos

420.00

1 Nos

42.00

Mazdoor (irri-Un skilled-Sn.3)

1.39 Nos

320.00

1 Nos

444.80

337269598.xlsx - data-WS New

Page 113 of 3205

Add for Municipal Allowance at

20%

Total
c&d) Overheads & Contractors Profit

Rs
13.615%
Rate per cu.m.

VAT & labour cess etc,.

Rs
0%

Rate per 1 Cum up to 3.00m initial depth below GL

B
a
b
c
d
e
f
g
h
96

Rs

Rate for Extra Delifts


Rate per 3 to 4.00 m depth from GL
Basic Rate of CC (1:5:10)
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every
1 m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per item no.32.(b) of the PH SSR, Pg.No.8

1.00 Cum
1.00 Cum

Basic Cost

Depth of CC (1:5:10) from Ground Level

3513.24
41.00

No. of
Delifts

Delift
charges

1 Cum
1 Cum

OH& CP @

3513.24
41.00

Total

VAT & LC

13.615%
0%
Rs. 41
Rate per 3 to 4.00 m depth from GL
3513.24
1.00
3554.24
483.91
0.0
4038.15
Rate per 4 to 5.00 m depth from GL
3513.24
2.00
3595.24
489.49
0.0
4084.73
Rate per 5 to 6.00 m depth from GL
3513.24
3.00
3636.24
495.07
0.0
4131.31
Rate per 6 to 7.00 m depth from GL
3513.24
4.00
3677.24
500.66
0.0
4177.90
Rate per 7 to 8.00 m depth from GL
3513.24
5.00
3718.24
506.24
0.0
4224.48
Rate per 8 to 9.00 m depth from GL
3513.24
6.00
3759.24
511.82
0.0
4271.06
Rate per 9 to 10.00 m depth from GL
3513.24
7.00
3800.24
517.40
0.0
4317.64
Rate per 10 to 11.00 m depth from GL
3513.24
8.00
3841.24
522.98
0.0
4364.22
BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below
Plinth)

M-30 GRADE OF MIX


Material
cement (ENC-PH.Memo.146/Cement & Steel /T1
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )
Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at
Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items

400.00 Kg
0.800 Cum
0.400 Cum

5.74
1854.81
791.93

1 Kg
1 Cum
1 Cum

2296.00
1483.85
316.77
4096.62

0.133 Nos.
0.267 Nos.
4.600 Nos.
20%

420.00
375.00
320.00

1 Each
1 Each
1 Each

55.86
100.13
1472.00
325.60
1953.59

1.333 hour

556.80

1 hour

742.21

1.333 hour

175.40

1 hour

1.20 Kl

103.00

1 Kl

233.81
976.02
123.60

BASIC COST per 1 cum


A

Base slab and Haunches and Toe


R.C.C. M 30 Per Cum
Centering charges ,Pg.106 to 108 of Bld. 1.A
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00
1.00
1.00
20%

Overheads & Contractors Profit

Cum
Cum
Cum

7149.83
277.00
446.00

Rs

7149.83

Rs

7149.83
277.00
446.00
89.20
7962.03
1084.03
9046.06
0.00
9046.06

1 Cum
1 Cum
1 Cum

13.615%
Total

VAT & labour cess etc,.

0%

Rate per 1 Cum up to 3.00m initial depth from GL

97.36
584.16
3513.24
478.33
3991.57
0.00
3991.57

Rate for Extra Delifts


Rate per 3 to 4.00 m depth below GL
Basic Rate of RCC-M30
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every
1 m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per item no.32.(b) of the PH SSR, Pg.No.8

Depth of RCC M-30 for Base slab from Ground Level

a
b
c
d

Rate per 3 to 4.00 m depth from GL


Rate per 4 to 5.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 6 to 7.00 m depth from GL

1.00 Cum
1.00 Cum

Basic Cost

7962.03
41.00

No. of
Delifts

7962.03
7962.03
7962.03
7962.03

337269598.xlsx - data-WS New

1.00
2.00
3.00
4.00

Delift
charges
Rs. 41
8003.03
8044.03
8085.03
8126.03

1 Cum
1 Cum

OH& CP @

13.615%
1089.61
1095.19
1100.78
1106.36

7962.03
41.00

VAT & LC

Total

0%

0.0
0.0
0.0
0.0

9092.64
9139.22
9185.81
9232.39

Page 114 of 3205

97

BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS
M-30 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement & Steel / T1
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )

400.00 Kg
0.800 Cum
0.400 Cum

5.74
1854.81
791.93

1 Kg
1 Cum
1 Cum

2296.00
1483.85
316.77
4096.62

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

0.167 Nos.
0.167 Nos.
5.600 Nos.
20%

420.00
375.00
320.00

1 Each
1 Each
1 Each

70.14
62.63
1792.00
384.95
2309.72

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

1.333 hour
1.333 hour

556.80
175.40

1 hour
1 hour

1.20 Kl

103.00

1 Kl

742.21
233.81
976.02
123.60
7505.96

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum
i

Vertical walls of circular faces for Intake well

Circular walls up to 3.00m Height & Thickness of


M-30 GRADE OF MIX
Centering charges for RCC vertical walls of circular faces up to 3 m
height.- 31-b.5-Pg.8 of PH SSR)

Rs

450 mm
1.00
2.22

Cum
Sqm

7505.96
1115.00

1 Cum
1 Sqm

7505.96
2475.30
Rs

Overheads & Contractors Profit

13.615%
Total

Rate per One Cum up to 3.00m height above G.L


i
b

Rs

9981.26
1358.95
11340.21
11340.21

Vertical walls of circular faces for Intake well with extra Delifts below Ground Level
Rate of 450 thick wall, 3m depth below GL
Basic Rate of 450mm thick RCC-M30 wall
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every
1 m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per item no.32.(b) of the PH SSR, Pg.No.8

1.00 Cum
1.00 Cum

Basic Cost

9981.26
41.00

No. of
Delifts

Delift
charges
Rs. 41
10678.26
10637.26
10596.26
10555.26
10514.26
10473.26
10432.26
10391.26
10350.26
10309.26
10268.26
10227.26
10186.26
10145.26
10104.26
10063.26
10022.26

1 Cum
1 Cum

OH& CP @

9981.26
41.00

VAT & LC

Total

Depth of RCC M-30 for Base slab from Ground Level

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 19 to 20.00 m depth from GL


Rate per 18 to 19.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 14 to 15.00 m depth from GL
Rate per 13 to 14.00 m depth from GL
Rate per 12 to 13.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 4 to 5.00 m depth from GL
Rate per 3 to 4.00 m depth from GL

98

BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished
item of work. for RCC SLABS, BEAMS

M-30 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement & Steel /T1)

9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26

400.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)

0.067 No
0.133 No
337269598.xlsx - data-WS New

17.00
16.00
15.00
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

5.74
1854.81
791.93

420.00
375.00

13.615%
1453.85
1448.26
1442.68
1437.10
1431.52
1425.93
1420.35
1414.77
1409.19
1403.61
1398.02
1392.44
1386.86
1381.28
1375.69
1370.11
1364.53

0%

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

12132.11
12085.52
12038.94
11992.36
11945.78
11899.19
11852.61
11806.03
11759.45
11712.87
11666.28
11619.70
11573.12
11526.54
11479.95
11433.37
11386.79

1 Kg

2296.00

1 Cum
1 Cum

1483.85
316.77
4096.62

1 No
1 No

28.14
49.88

Page 115 of 3205

Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)


Add for Municipal Allowance at
c

3.077 No

320.00

1 No

984.64

20%

212.53
1275.19

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

0.308 hour
0.308 hour

556.80
175.40

1 hour
1 hour

Water (including for curing) -M-189- SSR- irrigation items

1.200 Kl

103.00

1 Kl

BASIC COST per 1 cum


A

RCC M 30 Slabs up to 3.66 Mts height

RCC M 30 Slabs up to 3.66m Height & Thickness of

171.49
54.02
225.51
123.60
Rs

5720.92

Rs

5720.92
1514.09
1013.84
202.77
8451.62
1150.69
9602.31
0.00
9602.31

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
6.670 Sqm
6.670 Sqm
20%

Overheads & Contractors Profit

5720.92
227.00
152.00

1 Cum
1 Sqm
1 Sqm

13.615%
Total

VAT & labour cess etc,.


Rate per One Cum
99

0%
Rs

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below
Plinth)
M-20 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement &Steel / T1)

1 Kg

2009.00

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

350.00 Kg
0.800 Cum
0.400 Cum

1854.81
791.93

1 Cum
1 Cum

1483.85
316.77
3809.62

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.133 Nos.
0.267 Nos.
4.600 Nos.

420.00
375.00
320.00

1 Each
1 Each
1 Each

55.86
100.13
1472.00

Add for Municipal Allowance at

5.74

20%

325.60
1953.59

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)

1.333 hour

556.80

1 hour

742.21

Vibrator hire charges ( Hire -irrigation -41)

1.333 hour

175.40

1 hour

1.20 Kl

103.00

1 Kl

233.81
976.02
123.60

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum
a

for Footings
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00
1.00
1.00
20%

Overheads & Contractors Profit

6862.83
277.00
446.00

6862.83

Rs

6862.83
277.00
446.00
89.20
7675.03
1044.96
8719.99
0.00
8719.99

Rs

6862.83
315.00
710.00
142.00
8029.83
1093.26
9123.09
0.00
9123.09

1 Cum
1 Cum
1 Cum

13.615%

VAT & labour cess etc,.


Rate per 1 Cum
b

Cum
Cum
Cum

Rs

0%

Pedastals
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

6862.83
315.00
710.00

1 Cum
1 Cum
1 Cum

Sub - Total
Overheads & Contractors Profit

13.615%

VAT & labour cess etc,.


Rate per One Cum
c

0%

Plinth beams
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

13.615%

VAT & labour cess etc,.

0%
Total
337269598.xlsx - data-WS New

6862.83
1335.00
1075.00

1 Cum
1 Cum
1 Cum

6862.83
1335.00
1075.00
215.00
9487.83
1291.77
10779.60
0
10779.60

Page 116 of 3205

Rate per One Cum

Rs

10779.60

100 BLD-CSTN-3-14-(31)-B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS
M-20 GRADE OF MIX
Mateial
cement(ENC-PH.Memo.No.146/Cement & Steel / T1)

1 Kg

2009.00

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

350.00 Kg
0.800 Cum
0.400 Cum

1854.81
791.93

1 Cum
1 Cum

1483.85
316.77
3809.62

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.167 Nos.
0.167 Nos.
5.600 Nos.

420.00
375.00
320.00

1 Each
1 Each
1 Each

70.14
62.63
1792.00

Add for Municipal Allowance at

5.74

20%

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items

384.95
2309.72

1.333 hour

556.80

1 hour

742.21

1.333 hour

175.40

1 hour

1.20 Kl

103.00

1 Kl

233.81
976.02
123.60

BASIC COST per 1 cum


a

Rs

Columns up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Material charges for Centering & Scaffolding, Pg No. 106 to 108 of
Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 106 to 108 of
Bld. Items
Add Labour component @
Basic Cost
Overheads & Contractors Profit
VAT & labour cess etc,.

1.00 Cum
1.00 Cum

7218.96
341.00

1 Cum
1 Cum

7218.96
341.00

1.00 Cum

1603.00

1 Cum

1603.00

20%
Rs
13.615%
0%
Rs

Add 0.093 on Centering Charges i.e


Add 0.093 on Centering Charges i.e

1.00 Cum
0.557 16.67%
341.00
1603.00

VAT & labour cess etc,.

10774.75
=

9.30%

9.30%
9.30%

31.71
149.08
10955.54
0.00

0%

Rate per One Cum for 4.00m height

Rs

Add 0.366 on Centering Charges i.e


Add 0.366 on Centering Charges i.e

1.00 Cum
2.197 16.67%
341.00
1603.00

VAT & labour cess etc,.


Rate per One Cum for 5.00m height

10774.75
=

36.6%

36.60%
36.60%

0%
Rs

124.81
586.70
11486.25
0.00
11486.25

Lintels up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

7218.96
1133.00
1141.00

1 Cum
1 Cum
1 Cum

Sub - Total
Overheads & Contractors Profit

Rs
13.615%

VAT & labour cess etc,.

0%
Total

Rate per One Cum


i

10955.54

Columns 5.00m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m

10774.75

Columns 4.00m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m

320.60
9483.56
1291.19
10774.75
0.00

Rate per One Cum


b

7218.96

Rs

7218.96
1133.00
1141.00
228.20
9721.16
1323.54
11044.70
0.00
11044.70
11044.70

Lintels up to 7.32 Mts unsupported height above GL


M-20 GRADE OF MIX
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

7218.96
2042.00
1806.00

1 Cum
1 Cum
1 Cum
Rs

13.615%

337269598.xlsx - data-WS New

7218.96
2042.00
1806.00
361.20
11428.16
1555.94
12984.10

Page 117 of 3205

VAT & labour cess etc,.

0%

0.00

Total
Rate per One Cum

Rs

12984.10
12984.10

101 BLD-CSTN-3-14-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished
item of work. for RCC SLABS, BEAMS

M-20 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )
Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

350.00 Kg
0.800 Cum
0.400 Cum

5.74
1854.81
791.93

0.067 No
0.133 No
3.077 No

420.00
375.00
320.00

1 Kg
1 Cum
1 Cum

1 No
1 No
1 No

Water (including for curing) -M-189- SSR- irrigation items

212.53
1275.19

0.308 hour

556.80

1 hour

171.49

0.308 hour

175.40

1 hour

1.200 Kl

103.00

1 Kl

54.02
225.51
123.60

BASIC COST per 1 cum


I

RCC Slabs for Pump Room


RCC M 20 Slabs of 125mm thick

RCC M 20 Slabs up to 3.66m Height & Thickness of

28.14
49.88
984.64

20%

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)

2009.00
1483.85
316.77
3809.62

Rs

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items

125 mm
1.000 Cum
8.000 Sqm

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

8.000 Sqm
20%

5433.92
227.00

1 Cum
1 Sqm

5433.92
1816.00

152.00

1 Sqm

1216.00
243.20
8709.12
1185.75
9894.87
0.00

Rs
Overheads & Contractors Profit

13.615%
Total

VAT & labour cess etc,.

0%

Rate per One Cum for 3.66m height


b

Rs

RCC M 20 Slabs at 4.00 Mts height & Thickness of

125 mm

Rate for 4.00m Height


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m

0.56

Add 0.093 on Centering Charges i.e


Add 0.093 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.

227.00
152.00

9.3%
9.3%
9.3%

21.11
14.14
9930.12
0.00

0%
Rs

RCC M 20 Slabs at 5.00 Mts height & Thickness of

125 mm

Rate for 5.00m Height


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m

2.20

Add 0.367 on Centering Charges i.e


Add 0.367 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.
D

Rate per One Cum for 5.00m height


RCC M 20 Slabs up to 15.00 Mts height

RCC M 20 Slabs up to 15.00m Height & Thickness of

36.7%

36.7%
36.7%

83.31
55.78
10033.96
0.00

0%
Rs
250 mm
1.000 Cum
4.000 Sqm

5433.92
3260.00

1 Cum
1 Sqm
Rs

Overheads & Contractors Profit

13.615%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


III
a

RCC Beams
RCC M 20 Beams up to 3.66m Height
Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

9930.12

9894.87
16.67%

227.00
152.00

Cost of M- 20 grade mix


Centering charges ,Pg No.7 -31.a (ELSR ) up to 15m

9894.87

9894.87
16.67%

Rate per One Cum for 4.00m height


c

5433.92

Rs

1.00 Cum
1.00 Cum
1.00 Cum
20%
337269598.xlsx - data-WS New

5433.92
2002.00
1344.00

1 Cum
1 Sqm
1 Sqm

10033.96

5433.92
13040.00
18473.92
2515.22
20989.14
0.00
20989.14

5433.92
2002.00
1344.00
268.80

Page 118 of 3205

Overheads & Contractors Profit

Rs

9048.72
1231.98
10280.70
0.00

Rs

10280.70

13.615%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


b

RCC M 20 Beams up to 4.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e

10280.70
0.56

2002.00
1344.00

VAT & labour cess etc,.


Rate per One Cum for 4.00m height
c

16.67%

9.3%
9.3%
9.3%

0%
Rs

RCC M 20 Beams up to 5.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 0.367 on Centering Charges i.e
Add 0.367 on Centering Charges i.e

10280.70
2.20

16.67%

2002.00
1344.00

VAT & labour cess etc,.


Rate per One Cum for 5.00m height

36.7%

36.7%
36.7%

0%
Rs

IV

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end

RCC M20 for Sun shades up to 3.66m Height


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items

734.73
493.25
11508.68
0.00
11508.68

0.0625 Cum
1.00 Sqm

5433.92
224.00

1 Cum
1 Sqm

339.62
224.00

1.00 Sqm
20%

175.00

1 Sqm

175.00
35.00
773.62
105.33
878.95
0.00
878.95
878.95

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

Rs
Overheads & Contractors Profit

186.19
124.99
10591.88
0.00
10591.88

13.615%
Rs

VAT & labour cess etc,.

0%
Total

Rate per One Sqm

Rs

103 BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) using Sulphate Resistant Cementm finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc.,
including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ")
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Add for Municipal Allowance at
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & labour cess etc,.
Rate per 10 Sqm
Rate for other Floors

0.150 Cum

3733.88

1 Cum

560.08

0.600 Nos
0.960 Nos
20%

420.00
320.00

1 Nos
1 Nos

252.00
307.20
111.84
1231.12
167.62
1398.74
0.00
1398.74

13.615%
0%
Rs
1F

2F

1398.74 1398.74

Basic rate per 1Cum

3F

4F

5F

1398.74

1398.74

1398.74

9.90

9.90

9.90

9.90

9.90

Labour Charges for Scaffolding (Pg.No.108-Bld.SSR)

58.70

83.00

107.40

131.80

156.10

Add extra over Labour component

11.74

16.60

21.48

26.36

31.22

29.35

58.70

88.05

117.40

1537.59

1596.22

1654.85

1713.36

Material Hire Charges for Scaffolding (Pg.No.108-Bld.SSR)

For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total

1479.08

104 BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara
sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including
charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for
finished item of work of uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
Sand ( Lead statement-S.N.3 )
Top Coat in CM(1:4), 4 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
Sand ( Lead statement-S.N.3 )
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Add for Municipal Allowance at

43.00 Kg
0.18 Cum

5.74
858.93

1 Kg
1 Cum

246.82
154.61

14.50 Kg
0.04 Cum

5.74
858.93

1 Kg
1 Cum

83.23
34.36

0.63 day
1.47 day
3.90 day
20%

420.00
375.00
320.00

1 day
1 day
1 day

337269598.xlsx - data-WS New

264.60
551.25
1248.00
412.77

Page 119 of 3205

Total
C.Overheads & Contractors Profit

13.615%

VAT & labour cess etc,.


Rate per 10 Sqm

0%
Rs

2995.64
407.86
3403.50
0.00
3403.50

107 IRR-DAW-2-12: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete
using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm x 20
cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5 cm thick
and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping chamferred or rounded as directed etc., complete ( excluding cost of
providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 300 kg / cum with use of super
plasticiser(0.4% by wt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Unit
A. MATERIALS:
Cement mix
Cenent for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm ( C-Mat-Sn.47)
Coarse aggregate 10-4.75 mm ( C-Mat-Sn.58)
Fine aggregate ( screened ) ( C-Mat-Sn.3)
Super plasticiser - (Irri. SSR. Sn.70, Pg. 14)
Use rate of shuttering (rate as per Sub- data)
Scaffolding of shuttering @
Sundries

36 Rmt
5.74
5.74
1854.81
1519.81
858.93
86.00
218.86

1 kg
1 kg
1 cum
1 cum
1 cum
1 kg
1 sqm

14063.00
200.90
6751.51
2978.83
2645.50
842.80
25168.90
3775.34
30.00
56456.78

8.00 Hour
8.00 Hour
0.50 Hour

556.80
175.40
166.80

1 Hour
1 Hour
1 Hour

4454.40
1403.20
83.40
5941.00

2.00 Day
1.00 Day

420.00
400.00

1 Day
1 Day

840.00
400.00

2.00 Day
9.00 Day
4.00 Day
2.00 Day
7.00 Day
2.00 Day
115.00 sqm

320.00
320.00
320.00
320.00
320.00
320.00
78.45

1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
1 sqm

640.00
2880.00
1280.00
640.00
2240.00
640.00
9021.75
1353.26
3987.00
23922.01
86319.79
11752.44
98072.23
0.00
98072.23
2724.23

2450 kg
35.00 kg
3.64 cum
1.96 cum
3.08 cum
9.80 kg
115.00 sqm
15%
2.00 LS

B. MACHINERY:
Concrete mixer 300 / 200 ltr ( ele
Needle vibrator 40 mm ( ele )
10 hp pump ( ele )
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
work inspector ( Labour - irrigation- Sn. 10 )
mazdoor ( Labour - Irrigation- Un skilled Sn.3)
for batching cement ( cement handling )
for batching other materials
for loading mortar pans
for laying & packing concrete
for conveying concrete
for curing & miscellaneous
Labour for shuttering ( Rate as per Sub-data)
Labour for scaffolding @
Add for Municipal Allowance at

15%
20%

Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for cum 1854.81
VAT & labour cess etc,.

13.615%
0%

Rate per 1 Rmt

109 Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour charges for fabrication and fixing in
postion etc,. Complete.
Cost of Mild Steel, structural steel, i.e. Angles,channels and "I"
sections
Transportation of material for 20.00Km lead
Labour charges for fabrication -BMM-V.16 - Sn-936
Add Municipal allowence on labour component
Labour charges for fixing - BMM-V.17 - Sn.937
Add Municipal allowence on labour component
over heads & contractors profit
VAT & labour cess etc,.
Rate per 1 Kg

1 Kg

38.00

1 Kg

38.00

1 Kg
1 Kg
20%
1 Kg
20%

379.70
20.00

1000 Kg
1 Kg

18.00

1 Kg

0.38
20.00
4.00
18.00
3.60
83.98
11.43
95.41
0.00
95.41

13.615%
0%
Rs

ound moulded size 23x11x7 Cm - (1:6)

110 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement
Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Add for Municipal Allowance at
Total A+B
c.Overheads & Contractors Profit

48.00 Kg
512 Nos
0.20 Cum

5.74
4700.00
791.93

0.24 day.
0.56 day.
1.89 day.
20%

420.00
375.00
320.00

1 Kg
1000 Nos
1 Cum

275.52
2406.40
158.39

1 day.
1 day.
1 day.
Rs

13.615%
337269598.xlsx - data-WS New

100.80
210.00
604.80
183.12
3939.03
536.3

Ground moulded siz

Page 120 of 3205

VAT & labour cess etc,.


Grand Total
Rate per One Cum

0%
Rs

Rate for other Floors

1F

Basic rate per 1Cum

4475.33

4475.33

4475.33

4475.33

43.17

43.17

43.17

43.17

43.17

255.04

361.00

466.91

572.87

678.78

51.01

72.20

93.38

114.57

135.76

21.59

43.17

64.76

86.35

4973.29

5121.97

5270.71

5419.39

Material Hire Charges for Scaffolding - Pg.108


Labour Charges for Scaffolding - Pg - 108
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Rate per One Cum

2F

4824.56

3F

4F

4475.33
0.00
4475.33
4475.33

5F
4475.33

132 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at
the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels,
stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete,
painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108
Rate as per SSR Item No. 156,Pg 18 -BMT-F.29
over heads & contractors profit
Sub-Total
VAT & Labour cess
Rate per 1 Sqm

1.00 Sqm
13.615%

2861.00

1 Sqm

0%
Rs

2861.00
389.53
3250.53
0.00
3250.53

133 BMT-P.25: NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH GRILL PROVISION) Providing and
Fixing of windows made of pre-painted steel (Base steel as per IS 513 of 0.6mm thick galvanized as per IS 277 with Zinc of 120 GSM). Primer coated with
epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer. Section
for outer frame should be of 48x50mm, centre mullion should be of 48x50mm, section for shutter should be of 47x20mm and Fixed glass beading section
should be of 12x12mm. Outer frame and mullions to have rebate for Glazed shutter and a 20mm provision for Guard bars/Grills. The sections are to be cut
to length metre joined with corner bracket. Centre mullion is to be fixed with mullion cap. Seccolor Handle, seccolor stay, 2 nos. of Stainless Steel heavy
duty Pivot hinges shall be provided per shutter. The windows should be panelled with 5mm thick plain float glass. Rubber Gaskets are provided all around
the glass. The above frames should be fixed to the concrete/masonry wall by means of self expanding screws, Including 10mm Square guard bars with 6
(152.4mm) pitch etc., complete for finished item of work.

Double shutter Window with vertical member 40 x 40 (1219.2mm x 1219.2mm) outer frame section size of 48x50mm shutter frame section size of
47x20mm and mullion section should be of 48x50mm.
Rate as per SSR Item No. 742 Pg 62 -BMT-P.25

1 Sqm

over heads & contractors profit

1 Sqm

5680.00
773.33

0%

6453.33
0.00
6453.33

Sub-Total
VAT & Labour cess
Rate per 1 Sqm
b

5680.00

13.615%

Rs

Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section size of 48x50mm. Shutter frame section size of
47x20mm. Mullion section size of 48x50mm. Fixed beading section size of 12x12mm.
Rate as per SSR Item No. 743 Pg 62 -BMT-P.26
over heads & contractors profit
Sub-Total
VAT & Labour cess
Rate per 1 Sqm

1 Sqm
13.615%

5005.00

1 Sqm

0%
Rs

5005.00
681.43
5686.43
0.00
5686.43

134 Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and
vertically at 30cm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to
original surface neatly and painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bending, welding including all
operational charges and all labour charges etc., complete for finished item of work.
For MS Grill

1.50 x

1.50

2.25 Sqm

Quantity Anailysis
25mm x 6mm MS flat alround @ 1.20 Kg/Rmt
Vertical Flat
Horizontal Flat
Z Holdfasts

2 Nos
2 Nos
4 Nos

1.50
1.50
0.45

8.00 Rmt

3.00
3.00
2.00
8.00 Rmt
1.20 Kg/Rmt

9.60 Kgs

10mm M.S square bars @ 0.78 kg /Rmt


Vertical bars
Horizontal bars

5 Nos
12 Nos

1.50
1.50

26.00 Rmt
Cost Analysis
Cost of 25X 6mm MS Flat
Cost of 10mm MS squre bars
Labour charges for fabricating steel and fixing in position as per
SSR
Item
No.BMM-V.14-824
Labour
charges
for fixing Iron Doors, Iron Windows and Window
Grills
in Labour
positionBMM-V.15-825.Pg68
M.A on
component
@
Rate per 29.88 Kgs
Rate per 1 Sqm
Rate per 1 Kg

9.60 Kgs
20.28 Kgs
29.88 Kgs
29.88 Kgs
20%

337269598.xlsx - data-WS New

8.00 Rmt
18.00 Rmt
26.00 Rmt
0.78 Kg/Rmt

38.00
38.00
22.00
4.00

20.28 Kgs
29.88 Kgs
1 Kg
1 Kg
1 Kg
1 Kg
Rs.
Rs.

364.80
770.64
657.36
119.52
155.38
2067.70
918.98
69.20

Page 121 of 3205

135 BLD-CSTN-9-13-(111): Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over
CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and
slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for
finished item of work.
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed)
Cement
Sand
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add for Municipal Allowance at

0.17 Cum
120.00 Kg
0.085 Cum

1563.81
5.74
791.93

1 Cum
1 Kg
1 Cum

265.85
688.80
67.31

1.25 day
0.06 day
3.00 day
20%

420.00
375.00
320.00

1 day
1 day
1 day

525.00
22.50
960.00
301.50
2830.96
28.31
2859.27
389.29
3248.56
0.00
3248.56

Rs
Add water charges 1%
Total
over heads & contractors profit
Sub-Total
Add Labour Cess @
Rate per 10 Sqm

1.00%
13.615%
0%
Rs

138 Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers and frames anywhere in A.P., F.O.R. destination including, loading, unloading & stacking at site ,central excise duty,but excluding sales tax, octroi and other Govt levies etc., as applicable.ISI mark

Table 29, Pg No.80 of the SSR (PH items)


H.D.-20 with 560mm dia clear opening
Add CED @
Add ST @

1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

2133.00

1 each

2133.00
266.63
106.65
2506.30
290.41
2796.75
0.00
2796.75

13.615%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

160 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work
with nomonal reinforcement
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

5.74
1854.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1669.33
356.37
123.60
338.60

0.10 day
1.39 day
20%

420.00
320.00

1 day
1 day

42.00
444.80
97.36
4966.26
676.16
0.00
5642.42
5642.42

B. LABOUR:
Mason 1st class
Mazdoor (unskilled)

Add for Municipal Allowance at


Sub - Total

Rs

c.Overheads & Contractors Profit


Add VAT @
Grand Total

13.615%
0%
Rate per One Cum

Rs

183 RBR-FNDN-1- (I-B-ii) - In ordinary soils from 3.00 Mts to 6.00Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of
soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying
sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of
50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL

out put

210.0 Cum

a)Labour

a
b

Mate ( Labour- R&B-S.N.71)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add for Municipal Allowance at
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

0 Nos.
8.32 Nos.
20%

375.00
320.00

1 Each
1 Each

0.00
2662.40
532.48

6.00 hours

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
107.88
0.00
107.88
5.39
113.27

13.615%

0%
Rs
5%

337269598.xlsx - data-WS New

Rs

Page 122 of 3205

189 Manufacture,supply and delivery of RCC Socket and Spigot Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate per Meter of effective length) including
Transportation, Central Excice Duty, Sales Tax etc.complete.
f
RCC NP3 S/S pipe - 600mm dia
1 Rmt
2885.00
1 Rmt
2885.00
P1 Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
1 MT
6400.00
C1 SSR Rate of Cement / MT
1 MT
5740.00
C2 Market Rate of Cement / MT
64.80 Kg
Wc Cement required per 1 Rmt
-42.77
R1 Variation in Cement Cost ( 4000-5600)/1000*3.6
1 MT
41000.00
S1 SSR Rate of MS rods / MT
1 MT
36000.00
S2 Market Rate of MS rods/ MT
9.19 Kg
-45.95
Ws MS rods required per 1 Rmt
R2 Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
2796.28
Total lead
10 Km
Rate up to 5 Kms Lead
109.08
109.08
Rate for every additional 1 KM lead or part thereof
5.08
25.40
Cost of pipe per 1 Rmt including transport
2930.76
Add over heads & CP on pipe
13.615%
399.02
Add CED @
12.50%
349.54
Add ST @ 5%
5.00%
139.81
Cost of pipe per 1 Rmt
3819.13
Add VAT & Labour cess etc. @
0%
0.00
Cost of pipe per 1 Rmt
3819.13
g
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

h
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

RCC NP3 S/S pipe - 700mm dia


Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP3 S/S pipe - 800mm dia
Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt

1 Rmt
1 MT
1 MT
75.60 Kg

3683.00
6400.00
5740.00

1 MT
1 MT
13.61 Kg

41000.00
36000.00

1 Rmt

3683.00

-49.90

-68.05
3565.05

10 Km
146.88
10.04

146.88
50.20
3762.13
512.21
445.63
178.25
4898.22
0.00
4898.22

13.615%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
97.20 Kg

4875.00
6400.00
5740.00

1 MT
1 MT
18.57 Kg

41000.00
36000.00

1 Rmt

4875.00

-64.15

-92.85
4718.00

10 Km
173.88
10.04

173.88
50.20
4942.08
672.86
589.75
235.90
6440.59
0.00
6440.59

13.615%
12.50%
5.00%
0%

RCC NP4 S/S pipe -for Mains


i
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

RCC NP4 S/S pipe - 400mm dia


Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof

1 Rmt
1 MT
1 MT
39.60 Kg

1658.00
6400.00
5740.00

1 MT
1 MT
4.79 Kg

41000.00
36000.00

1 Rmt

1658.00

-26.14

-23.95
1607.91

10 Km
66.96
3.31
337269598.xlsx - data-WS New

66.96
16.55

Page 123 of 3205

Cost of pipe per 1 Rmt including transport


Add over heads & CP on pipe
Add CED @
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
j
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

k
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

l
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

m
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

RCC NP4 S/S pipe - 450mm dia


Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP4 S/S pipe - 500mm dia
Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP4 S/S pipe - 600mm dia
Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP4 S/S pipe - 700mm dia
Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77

1691.42
230.29
200.99
80.40
2203.10
0.00
2203.10

13.615%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
43.20 Kg

1812.00
6400.00
5740.00

1 MT
1 MT
5.33 Kg

41000.00
36000.00

1 Rmt

1812.00

-28.51

-26.65
1756.84

10 Km
73.44
3.31

73.44
16.55
1846.83
251.45
219.61
87.84
2405.73
0.00
2405.73

13.615%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
50.40 Kg

2235.00
6400.00
5740.00

1 MT
1 MT
6.47 Kg

41000.00
36000.00

1 Rmt

2235.00

-33.26

-32.35
2169.39

10 Km
81.00
3.56

81.00
17.80
2268.19
308.81
271.17
108.47
2956.64
0.00
2956.64

13.615%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
64.80 Kg

2965.00
6400.00
5740.00

1 MT
1 MT
9.19 Kg

41000.00
36000.00

1 Rmt

2965.00

-42.77

-45.95
2876.28

10 Km
109.08
5.08

109.08
25.40
3010.76
409.91
359.54
143.81
3924.02
0.00
3924.02

13.615%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
75.60 Kg

3856.00
6400.00
5740.00

1 MT
1 MT
13.61 Kg

41000.00
36000.00

1 Rmt

3856.00

-49.90

337269598.xlsx - data-WS New

-68.05

Page 124 of 3205

Actual Rate of Pipe per Rmt (R1+R2 )


Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
0.12
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
n
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

3738.05
10 Km
146.88
10.04

146.88
50.20
3935.13
535.77
467.26
186.90
5125.06
0.00
5125.06

13.615%
12.50%
5.00%
0%

RCC NP4 S/S pipe - 800mm dia


Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt

1 Rmt
1 MT
1 MT
97.20 Kg

5035.00
6400.00
5740.00

1 MT
1 MT
18.57 Kg

41000.00
36000.00

1 Rmt

5035.00

-64.15

-92.85
4878.00

10 Km
173.88
10.04

173.88
50.20
5102.08
694.65
609.75
243.90
6650.38
0.00
6650.38

13.615%
12.50%
5.00%
0%

190 Manufacture,supply and delivery of Rubber rings to suit RCC Socket and Spigot Pipes confirming to B.I.S. 5382/ 1985 (RATE PER EACH RUBBER
RING) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT etc.complete.
A

Dia of the Rubber Ring

Basic Cost

RCC NP2 S/S pipe - 80mm dia


RCC NP2 S/S pipe - 100mm dia
RCC NP2 S/S pipe - 150mm dia
RCC NP2 S/S pipe - 200mm dia
RCC NP2 S/S pipe - 225mm dia
RCC NP2 S/S pipe - 250mm dia
RCC NP2 S/S pipe - 300mm dia
RCC NP2 S/S pipe - 350mm dia
RCC NP2 S/S pipe - 400mm dia
RCC NP2 S/S pipe - 450mm dia
RCC NP2 S/S pipe - 500mm dia
RCC NP2 S/S pipe - 600mm dia
RCC NP2 S/S pipe - 700mm dia
RCC NP2 S/S pipe - 800mm dia
B

29.00
35.00
63.00
74.00
81.00
91.00
111.00
129.00
142.00
161.00
210.00
276.00
375.00
476.00

Dia of the Rubber Ring

Basic Cost

RCC NP3 S/S pipe - 300mm dia


RCC NP3 S/S pipe - 350mm dia
RCC NP3 S/S pipe - 400mm dia
RCC NP3 S/S pipe - 450mm dia
RCC NP3 S/S pipe - 500mm dia
RCC NP3 S/S pipe - 600mm dia
RCC NP3 S/S pipe - 700mm dia
RCC NP3 S/S pipe - 800mm dia
RCC NP3 S/S pipe - 900mm dia
RCC NP3 S/S pipe - 1000mm dia

CED @

12.50%
3.63
4.38
7.88
9.25
10.13
11.38
13.88
16.13
17.75
20.13
26.25
34.5
46.88
59.5
CED @

143.00
171.00
194.00
220.00
252.00
366.00
438.00
531.00
718.00
867.00

12.50%
17.88
21.38
24.25
27.5
31.5
45.75
54.75
66.38
89.75
108.38

ST @

Sub-Total

OH& CP @

5%
1.45
1.75
3.15
3.70
4.05
4.55
5.55
6.45
7.10
8.05
10.50
13.80
18.75
23.80
ST @

13.615%

34.08
41.13
74.03
86.95
95.18
106.93
130.43
151.58
166.85
189.18
246.75
324.30
440.63
559.30
Sub-Total

3.95
4.77
8.58
10.08
11.03
12.39
15.11
17.56
19.33
21.92
28.59
37.58
51.06
64.81
OH& CP @

5%
7.15
8.55
9.70
11.00
12.60
18.30
21.90
26.55
35.90
43.35

Total

38.03
45.90
82.61
97.03
106.21
119.32
145.54
169.14
186.18
211.10
275.34
361.88
491.69
624.11
Total

13.615%

168.03
200.93
227.95
258.50
296.10
430.05
514.65
623.93
843.65
1018.73

19.47
23.28
26.41
29.95
34.31
49.83
59.63
72.30
97.76
118.04

187.50
224.21
254.36
288.45
330.41
479.88
574.28
696.23
941.41
1136.77

Sub Analysis : (Basic Data)

OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure including transportation of Water with
minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days) (including LC)
Fitters I Class ( Labour-Irrigation-Skilled-Sn.6)
3.000 day
420.00
1 day
1260.00
Fitters II Class ( Labour-Irrigation-semi Skilled-Sn.9)
3.000 day
375.00
1 day
1125.00
Machinery
Hire chargers for Hydralic field test pressure testing including
3.000 days
1200.00
1 days
3600.00
transportation of water @ Rs. 1200/- (1000+200) / day
Material
Pressure guage
3/4" G.I. Pipe (20 mm) cost vide ( BMW-F.81 - BMW-F.82 ) - sanitary
SSR
Specials

0.050 Nos
3.000 RM
1 Ls

337269598.xlsx - data-WS New

500.00
151.00

1 Nos
1 RM

25.00
453.00

500.00

1 Ls

500.00

Page 125 of 3205

Dummies
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22)
(T) Total Rate per 500 Mts.
(r) Rate per 1 Rmt for 450 mm dia
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r

0.100 No.
60.000 Lts.

1500.00
57.00

1 Each
1 Lts.

150.00
3420.00
10533.00
21.07
0.468

191 PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing
including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 - RCC-NP2

Unit= 1 rmt
Taking out put 100 rmt
Lowering - RCC S/S pipes - 80 mm dia -NP-2
a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

80 mm dia

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

0.780 day
1.800 day
5.000 day
1.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

327.60
675.00
1600.00
416.00
3018.60

50.000 each

34.08

1 each

1704.00

100.000 rm

3.74

1 rm

374.00

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

5096.60
33.93

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 100 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs
100 mm dia

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

0.960 day
2.240 day
6.300 day
1.600 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

403.20
840.00
2016.00
512.00
3771.20

50.000 each

41.13

1 each

2056.50

100.000 rm

4.68

1 rm

468.00

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

6295.70
42.39

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 150 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

1.170 day
2.730 day
7.800 day
1.600 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

491.40
1023.75
2496.00
512.00
4523.15

50.000 each

74.03

1 each

3701.50

100.000 rm

7.02

1 rm

702.00

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

8926.65
52.25
8978.90
1222.48
10201.38
102.01
0.00

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 200 mm dia -NP-2


a) Labour

6338.09
862.93
7201.02
72.01
0.00
72.01

150 mm dia

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

5130.53
698.52
5829.05
58.29
0.00
58.29

Rs
200 mm dia

337269598.xlsx - data-WS New

102.01

Page 126 of 3205

Mason 1st class (labour-Irrigation.S.N.11)


2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

1.170 day
2.730 day
7.800 day
1.600 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

491.40
1023.75
2496.00
512.00
4523.15

50.000 each

86.95

1 each

4347.50

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

9.36

1 rm

936.00

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

9806.65
54.59

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 225 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

9861.24
1342.61
11203.85
112.04
0.00
112.04

225 mm dia
1.620 day
3.780 day
10.500 day
2.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

680.40
1417.50
3360.00
736.00
6193.90

50.000 each

95.18

1 each

4759.00

10.53

1 rm

1053.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

12005.90
72.47

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 250 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

12078.37
1644.47
13722.84
137.23
0.00
137.23

250 mm dia
1.620 day
3.780 day
10.500 day
2.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

680.40
1417.50
3360.00
736.00
6193.90

50.000 each

106.93

1 each

5346.50

1 rm

1170.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

11.70

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

12710.40
73.64

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 300 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

12784.04
1740.55
14524.59
145.25
0.00
145.25

300 mm dia
1.750 day
4.140 day
11.600 day
2.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

735.00
1552.50
3712.00
736.00
6735.50

40.000 each

130.43

1 each

5217.20

1 rm

1404.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

14.04

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

13356.70
81.40

13.615%

0%

VAT & Labour cess.

Rate per 1 Rmt


337269598.xlsx - data-WS New

Rs

13438.10
1829.60
15267.70
152.68
0.00
152.68

Page 127 of 3205

Lowering - RCC S/S pipes - 350 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

350 mm dia
1.900 day
4.500 day
12.700 day
2.400 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

798.00
1687.50
4064.00
768.00
7317.50

40.000 each

151.58

1 each

6063.20

1 rm

1638.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

16.38

(d) Total = a+b+c

15018.70
89.56

(e) Add for water charges @ 1% on Labour & Testing Charges

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 400 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

15108.26
2056.99
17165.25
171.65
0.00
171.65

400 mm dia
2.100 day
4.900 day
13.900 day
2.900 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

882.00
1837.50
4448.00
928.00
8095.50

40.000 each

166.85

1 each

6674.00

1 rm

1872.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

18.72

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

16641.50
99.68

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 450 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

16741.18
2279.31
19020.49
190.20
0.00
190.20

450 mm dia
2.250 day
5.250 day
15.000 day
3.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

945.00
1968.75
4800.00
1056.00
8769.75

40.000 each

189.18

1 each

7567.20

1 rm

2106.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

21.06

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

18442.95
108.76

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 500 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

18551.71
2525.82
21077.53
210.78
0.00
210.78

500 mm dia
2.430 day
5.670 day
16.200 day
3.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

1020.60
2126.25
5184.00
1056.00
9386.85

40.000 each

246.75

1 each

9870.00

1 rm

2340.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

23.40

21596.85
117.27

13.615%

337269598.xlsx - data-WS New

21714.12
2956.38
24670.50
246.71

Page 128 of 3205

VAT & Labour cess.

0%

0.00

Rate per 1 Rmt


l

Lowering - RCC S/S pipes - 600 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

246.71

600 mm dia
2.750 day
6.450 day
16.300 day
3.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

1155.00
2418.75
5216.00
1056.00
9845.75

40.000 each

324.30

1 each

12972.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

28.08

1 rm

2808.00

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
m

25625.75
126.54
25752.29
3506.17
29258.46
292.58

13.615%

Lowering - RCC S/S pipes -700 mm dia -NP-2


Basic rate as per PH SSR item No.11-B - Pg -3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

700 mm dia
1 No
13.615%

321.00

1 No

Lowering - RCC S/S pipes -800 mm dia -NP-2


Basic rate as per PH SSR item No.11-B - Pg -3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

800 mm dia
1 No
13.615%

385.00

Rs

553.00
75.29
628.29
0.00
628.29

0%

Lowering - RCC S/S pipes -900 mm dia -NP-2


Basic rate as per PH SSR item No.11-B - Pg -3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

900 mm dia
1 No
13.615%

462.00

1 No

0%
Rate per 1 Rmt

Rs

462.00
62.90
524.90
0.00
524.90

1 No

Rate per 1 Rmt


o

Rs

385.00
52.42
437.42
0.00
437.42

0%
Rate per 1 Rmt

Rs

321.00
43.70
364.70
0.00
364.70

Lowering - RCC S/S pipes -1000 mm dia -NP-2


Basic rate as per PH SSR item No.11-B - Pg -3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

1000 mm dia
1 No
13.615%

553.00

1 No

0%
Rate per 1 Rmt

192 PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing
including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 - RCC-NP3
Unit= 1 rmt
Taking out put 100 rmt
a

Lowering - RCC S/S pipes -300 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

300 mm dia
1.750 day
4.140 day
11.600 day
2.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

735.00
1552.50
3712.00
736.00
6735.50

40.000 each

168.03

1 each

6721.20

1 rm

1404.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

100.000 rm

14.04

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14860.70
81.40

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes -350 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)

Rs

14942.10
2034.37
16976.47
169.76
0.00
169.76

350 mm dia
1.900 day
4.500 day
337269598.xlsx - data-WS New

420.00
375.00

1 day
1 day

798.00
1687.50

Page 129 of 3205

Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

12.700 day
2.400 day

320.00
320.00

1 day
1 day

4064.00
768.00
7317.50

40.000 each

200.93

1 each

8037.20

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

100.000 rm

16.38

1 rm

13.615%

0%
Rate per 1 Rmt

1638.00
16992.70
89.56

Lowering - RCC S/S pipes -400 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

17082.26
2325.75
19408.01
194.08
0.00
194.08

400 mm dia
2.100 day
4.900 day
13.900 day
2.900 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

882.00
1837.50
4448.00
928.00
8095.50

40.000 each

227.95

1 each

9118.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

100.000 rm

18.72

1 rm

13.615%

0%
Rate per 1 Rmt

1872.00
19085.50
99.68

Lowering - RCC S/S pipes -450 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

19185.18
2612.06
21797.24
217.97
0.00
217.97

450 mm dia
2.250 day
5.250 day
15.000 day
3.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

945.00
1968.75
4800.00
1056.00
8769.75

40.000 each

258.50

1 each

10340.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

21.06

1 rm

2106.00

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

21215.75
108.76

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes -500 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

Rs

21324.51
2903.33
24227.84
242.28
0.00
242.28

500 mm dia
2.430 day
5.670 day
16.200 day
3.300 day

420.00
375.00
320.00
320.00

1 day
1 day
1 day
1 day

1020.60
2126.25
5184.00
1056.00
9386.85

40.000 each

296.10

1 each

11844.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

23.40

1 rm

2340.00

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

23570.85
117.27

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes -600 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)

Rs

23688.12
3225.14
26913.26
269.13
0.00
269.13

600 mm dia
2.750 day
337269598.xlsx - data-WS New

420.00

1 day

1155.00

Page 130 of 3205

2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)


Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

6.450 day
16.300 day
3.300 day

375.00
320.00
320.00

1 day
1 day
1 day

2418.75
5216.00
1056.00
9845.75

40.000 each

430.05

1 each

17202.00

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100.000 rm

28.08

1 rm

2808.00

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

29855.75
126.54

13.615%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes -700 mm dia - NP-3


Basic rate as per SSR item No.11-B - Pg - 297 including cost of
rubber rings
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
Rate per 1 Rmt
Lowering - RCC S/S pipes -800 mm dia - NP-3
Basic rate as per SSR item No.11-B - Pg - 297 - including cost of
rubber rings
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
Rate per 1 Rmt
Lowering - RCC S/S pipes -900 mm dia - NP-3
Basic rate as per SSR item No.11-B - Pg - 297 - including cost of
rubber rings
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
Rate per 1 Rmt
Lowering - RCC S/S pipes -1000 mm dia - NP-3
Basic rate as per SSR item No.11-B - Pg - 297 - including cost of
rubber rings
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
Rate per 1 Rmt

Rs
700 mm dia
1 No

321.00

1 No

321.00

13.615%
0%
Rs
800 mm dia
1 No

385.00

1 No

0%
Rs

462.00

1 No

0%
Rs

553.00

52.42
437.42
0.00
437.42

462.00

13.615%

1000 mm dia
1 No

43.70
364.70
0.00
364.70

385.00

13.615%

900 mm dia
1 No

29982.29
4082.09
34064.38
340.64
0.00
340.64

1 No

62.90
524.90
0.00
524.90

553.00

13.615%
0%
Rs

75.29
628.29
0.00
628.29

193 Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers and frames anywhere in A.P., F.O.R. destination including, loading, unloading & stacking at site ,central excise duty,but excluding sales tax, octroi and other Govt levies etc., as applicable.ISI mark

Table 29, Pg No.80 of the SSR (PH items)


M.D. -10 with 500mm dia clear opening
Add CED @
Add ST @

1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

1543.00

1 each

13.615%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

H.D.-20 with 500mm dia clear opening


Add CED @
Add ST @

2023.15
1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

1989.00

1 each

1989.00
248.63
99.45
2337.10
270.80
2607.90
0.00
2607.90

2133.00

1 each

2133.00
266.63
106.65
2506.30
290.41
2796.75
0.00
2796.75

2286.00

1 each

2286.00
285.75
114.30
2686.05

13.615%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

H.D.-20 with 560mm dia clear opening


Add CED @
Add ST @

1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

13.615%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

H.D.-35 with 560mm dia clear opening.


Add CED @
Add ST @

1543.00
192.88
77.15
1813.05
210.08
2023.15
0.00

1 No
12.50%
5.00%

337269598.xlsx - data-WS New

Page 131 of 3205

Overheads & Contractors Profit on basic cost

13.615%

311.24
2997.30
0.00
2997.30

Rate per each


Add VAT & Labour cess etc. @

0%
Rate per each

194 Manufacture as per companys standard specifications, supply and delivery of encapsulated plastic steps for man holes anywhere in A.P. including cost of
materials packing as per companys standards, loading, transportation, unloading and stacking at site of work etc, complete but excluding taxes such as
sales tax, C.E.D and others etc., as applicable.
Table 29, Pg No.80 of the SSR
Add CED @
Add ST @

1 No
12.50%
5.00%

166.00

1 each

Total
Overheads & Contractors Profit on basic cost

Rs
13.615%

Rate per each


Add VAT & Labour cess etc. @

0%
Rate per each

166.00
20.75
8.30
195.05
22.60
217.65
0.00
217.65

195 Supply and delivery of Bolts and nuts with double washers including taxes and conveyance etc
Basic rate as per Table -31, Sl.No.5
Overheads & Contractors Profit
Rate per Kg
VAT & Labour cess.
Rate per Kg

1 Kg
13.615%

123.00

1 Kg

0%

123.00
16.75
139.75
0.00
139.75

196 BMW-A.02 : Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM
1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with
watering and tamping.
101.60 mm (4") dia SWG pipe upto 3' depth -Sl-2,
Pg-97 of Bld items

1.00 Rmt

408.00

labour charges for laying, jointing and testing SWG pipes up to (5') BMW-A.06, Pg.97

20%

216.00

Total
Overheads & Contractors Profit
Total

1 Rmt

43.20
451.20
61.43
512.63
512.65
0.00
512.65

13.615%
Rate per 1 RM

Add VAT & Labour cess etc. @


Cost per 1 Rmt

408.00

0%

197 BMW-B.01 ; Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using
fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop;
thick both inside and outside fitted with 20 dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts
of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick
as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges
on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.

Inspection chamber 3' dia and upto 3' depth


Rate as per SSR item - BMW-B.01, Pg.100
Over heads and Contractors profit @ 14%
Total

1 No.
13.615%

6530.00

Each

Rate per 1 No
Add VAT & Labour cess etc. @
Cost per 1 No.

0%

6530.00
889.06
7419.06
7419.10
0.00
7419.10

198 BMW-B.02: Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using
fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop;
thick both inside and outside fitted with 20 dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts
of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick
as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges
on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.

Inspection chamber 3' dia and upto 5' depth


Rate as per SSR item - BMW-B.02, Pg.101
Over heads and Contractors profit @ 14%
Total

1 No.
13.615%

10218.00

Each

Rate per 1 No
Add VAT & Labour cess etc. @
Cost per 1 No.

0%

10218.00
1391.18
11609.18
11609.20
0.00
11609.20

199 BMW-B.03: Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd
Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3
prop; thick both inside and outside fitted with 20 dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all
sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm
thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage
charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc.,
complete for finished item of work as per Standard specification.

Inspection chamber 3' dia and upto 3' depth


Rate as per SSR item - BMW-B.03, Pg.101
Over heads and Contractors profit @ 14%
Total

1 No.
13.615%
Rate per 1 No
337269598.xlsx - data-WS New

6237.00

Each

6237.00
849.17
7086.17
7086.20

Page 132 of 3205

Add VAT & Labour cess etc. @


Cost per 1 No.

0%

0.00
7086.20

200 BMW-B.04: Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd
Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3
prop; thick both inside and outside fitted with 20 dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all
sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm
thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage
charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc.,
complete for finished item of work as per Standard specification.

Inspection chamber 3' dia and upto 5' depth


Rate as per SSR item - BMW-B.04, Pg.101
Over heads and Contractors profit @ 14%
Total

1 No.
13.615%

9651.00

Each

9651.00
1313.98
10964.98
10965.00

Rate per 1 No
Add VAT & Labour cess etc. @
Cost per 1 No.

0%

0.00
10965.00

201 BMW-A.09 : Supplying , laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded granite metal chips and cradling 152.4
mm SWG pipe line all round to have 76.2 mm thick cover over the sockets.
Page 97 of the SSR, Sl.No.9
labour charges - BMW-A.10, Page 97 of the SSR, Sl.No.10

1 Rmt
20%

Total
Overheads & Contractors Profit
Total

217.00
49.00

1 Rmt

217.00
9.80
226.80
30.88
257.68
257.70
0.00
257.70

13.615%
Rate per 1 RM

Add VAT & Labour cess etc. @


Cost per 1 No.

0%

202 Carting of surplus excavated rock from the site to a suitable distance including loading, unloading charges, cost & conveyance, dumping, labour charges,
all leads & lifts and other incidental and operational charges etc., complete.
a Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km
1 cu.m.
82.70
1 Cum
82.70
Add Sundries
0.00
Rate per 1 Cum
Rs
82.70
Add VAT & Labour cess etc. @
0%
0.00
Rate per 1 Cum
82.70
b

Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km
Add Sundries
Rate per 1 Cum
Add VAT & Labour cess etc. @
Rate per 1 Cum

1 cu.m.

82.70

1 Cum
Rs

0%

82.70
0.00
82.70
0.00
82.70

205 RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and
lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
Rubble Stone Masonry in Cement Mortar
a) labour
Mate
Mazdoor (Unskilled)
Add for Municipal Allowance at
b) Machinery
Tractor with trolley 3t
Total

Unit

1.25 Cum

0.000 day
0.780 day
20%

483.00
413.00

1 day
1 day

0.270 hour

415.00

1 hour

0.00
322.14
64.43

Rs
13.615%

C.Overheads & Contractors Profit


Total for 1.25 Cum
Total for 1 Cum

VAT & Labour cess.

0%
Rate per 1 Cum

Rs

112.05
498.62
67.89
566.51
453.21
0.00
453.21

211 Dismantelling & clearing away the CC & carting the excavated material from the site within 5.00 kms distance to a suitable site including loading,
unloading, conveyance charges & dumping the carted materialat at the contractor's cost, including all labour charges, all leads, lifts and other incidental &
operational charges etc.,complete.
a

Unreinforced cement concrete upto 15 cm thicknes


Details of cost for 1 cu.m.
Labour :Mazdoor (unskilled)

2.440 day
20%

Add for Municipal Allowance at


Sundries
Add for water charges @ 1 %
Cost per cu m
C.Overheads & Contractors Profit
Total

384.00

1 Cum

936.96
187.39

13.615%

VAT & Labour cess

0%
Rate per 1 Cum

337269598.xlsx - data-WS New

Rs

9.37
1133.72
158.72
1292.44
0.00
1292.44

Page 133 of 3205

212 Dismantelling & clearing stacking useful materials of the Reinforced concrete (excavated material) & transporting away the site within 10kms distance to a
suitable site including loading, unloading, conveyance charges & dumping the carted materialat the contractor's cost, including all labour charges, all leads,
lifts and other incidental & operational charges etc.,complete for SWD roof slabs.
a

Reinforced cement concrete


Details of cost for 1 cu.m.
Labour :Mazdoor (unskilled)

4.320 day
20%

Add for Municipal Allowance at

384.00

1 Cum

1658.88
331.78

Sundries
Add for water charges @ 1 %
Cost per cu m
C.Overheads & Contractors Profit
Total

0%
Rate per 1 Cum
213 PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains where ever required (.Dia of pipes in mm.)
Details of cost for one cutting
a Cutting C.I./ DI Pipe -80 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
0.060 day
375.00
Man mazdoor
0.060 day
320.00
Add for Municipal Allowance at
20%

Rs

16.59
2007.25
281.02
2288.27
0.00
2288.27

Rs

22.50
19.20
8.34
50.04
6.81
56.85
0.00
56.85

Rs

30.00
25.60
11.12
66.72
9.08
75.80
0.00
75.80

Rs

41.25
35.20
15.29
91.74
12.49
104.23
0.00
104.23

Rs

56.25
48.00
20.85
125.10
17.03
142.13
0.00
142.13

Rs

75.00
64.00
27.80
166.80
22.71
189.51
0.00
189.51

Rs

93.75
80.00
34.75
208.50
28.39
236.89
0.00
236.89

VAT & Labour cess

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.
Rate per each cut
b

1 day
1 day

13.615%
0%

Cutting C.I./ DI Pipe -100 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.080 day
0.080 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

Cutting C.I./ DI Pipe -125 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.110 day
0.110 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

Cutting C.I./ DI Pipe -150 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.150 day
0.150 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

Cutting C.I./ DI Pipe -200 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.200 day
0.200 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 250 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.250 day
0.250 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 300 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class

0.300 day
337269598.xlsx - data-WS New

375.00

1 day

112.50

Page 134 of 3205

Man mazdoor
Add for Municipal Allowance at

0.300 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

320.00

1 day

Rs

131.25
112.00
48.65
291.90
39.74
331.64
0.00
331.64

13.615%
0%
Rate per each cut

Rs

96.00
41.70
250.20
34.06
284.26
0.00
284.26

Cutting C.I./ DI Pipe - 350 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
Add for Municipal Allowance at

0.350 day
0.350 day
20%

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

375.00
320.00

1 day
1 day

13.615%
0%
Rate per each cut

337269598.xlsx - data-WS New

Page 135 of 3205

Building Data
Kandukur Municipality
DATA BASED ON - 2015 - 2016 SSR
20/02/16
EARTH WORK EXCAVATION
1

BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental,
labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as
per SS - 20 B (APSS 308).

Ordinary Soil-Manual Means-Upto 3 m depth

out put

a)Labour
Mate
Mazdoor (Unskilled) (excluding LC )
Add Labour component @
Sub total
extra for foundations @

10.00 Cum

0 day
3.64 day.
20%

375.00
320.00

1 day
1 day.

0.00
1164.80
232.96
1397.76
873.60
2271.36
309.25
2580.61
258.06
0.00

75%
Sub - Total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & labour cess

13.615%

0%

Rate per 1 Cum excluding Dewatering


2

Rs

258.06

RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for footings, Sumps,Thrust blocks,
Chambers and Man Holes etc. by manual means,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL
a)Labour

out put

Mate
Mazdoor (Unskilled)

0 Nos.
3.64 Nos.

Add Labour component @


Sub total
c&d) Overheads & Contractors Profit

20%

10.00 Cum
375.00
320.00

1 Each
1 Each

0.00
1164.80
232.96
1397.76
190.31

13.615%

Cost for 240 cum = a+b+c+d


Rate per cum = (a+b+c+d)/10

1588.07
158.81

VAT & labour cess

GravelFilling in Foundations

0%

0.00

Rate per 1 Cum excluding Dewatering


Rs
158.81
BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each
deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T &
P etc., complete for finished item of work. (APSS NO. 309 & 310)
Garvel Filling

out put

6.00 Cum

a) Material
Gravel

6.00 Cum

306.76

1 Cum

1840.56

b)Labour
Mate
Mazdoor (Unskilled)

0.00 day
0.31 day

375.00
320.00

1 day
1 day

0.00
99.20
1939.76
264.1
2203.86
367.31
0.00

Sub Total
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & Labour cess

14%

0%

Rate per 1 Cum

367.31

BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard
Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on
all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for
finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement

1 Kg

1262.80

Coarse aggregate 40mm graded

220.00 Kg
0.90 Cum

1489.81

5.74

1 Cum

1340.83

Fine aggregate (Sand)

0.45 Cum

791.93

1 Cum

356.37

Water (including for curing)

1.20 Kl

103.00

1 Kl

123.60

Mason 1st class

0.10 day

420.00

1 day

42.00

Mazdoor (unskilled)

2.36 day

320.00

1 day

755.20

B. LABOUR:

Sub - Total
c.Overheads & Contractors Profit

Rs
14%

337269598.xlsx Bld up to 3F

3880.80
528.37

Page 136 of 3205


VAT & Labour cess

0%

0.00

Grand Total

4409.17
Rate per One Cum

Rs

4409.17

DESIGN MIX
5

BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code fo FOUNDATIONS, PLINTH, PEDESTALS

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20 GRADE OF MIX
20mm HBG graded metal

0.80 Cum

1854.81

1 Cum

Sand

0.40 Cum

791.93

1 Cum

Cement

350.00 Kg

5.74

316.77

1 Kg

2009.00

1st Class Mason

0.133 day.

420.00

1 day.

55.86

2nd Class Mason

0.267 day.

375.00

1 day.

100.13

Mazdoor (Both Men & Women)

4.60 day.

320.00

1 day.

1472.00

Weigh batcher hire charges, machine mixing charges

1.333 hour

338.60

1 hour

451.35

Vibrator hire charges

1.333 hour

175.40

1 hour

233.81

1.20 Kl

103.00

1 Kl

Water (including for curing)


BASIC COST per 1 cum
a

1483.85

123.60
Rs

Footings
R.C.C. M 20 Per Cum

1.00 Cum

6246.37

1 Cum

6246.37

Centering charges ,Pg No.92

1.00 Cum

277.00

1 Cum

277.00

Labour charges,Pg No.92

1.00 Cum

446.00

1 Cum

446.00

Add Labour component on Labour charges @

20%

89.20

Sub - Total
Overheads & Contractors Profit

7058.57
14%

VAT & Labour cess

961.02

0%

0.00

Rate per One Cum


c

Rs

8019.59

Plinth beams
R.C.C. M 20 Per Cum

1.00 Cum

6246.37

1 Cum

6246.37

Centering charges ,Pg No.92

1.00 Cum

1335.00

1 Cum

1335.00

Labour charges,Pg No.92

1.00 Cum

1075.00

1 Cum

1075.00

Add Labour component @

20%

215.00

Sub - Total
Overheads & Contractors Profit

8871.37
14%

VAT & Labour cess

1207.84

0%

0.00

Rate per One Cum


6

6246.37

Rs

10079.21

BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN
BUILDINGS

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS:
20mm HBG graded metal

0.80 cum

1854.81

1 cum

Sand

0.40 cum

791.93

1 cum

316.77

350.00 Kgs

5.74

1 Kgs

2009.00

Cement
Sub Total of - A

1483.85

3809.62

B. LABOUR:
1st Class Mason

0.167 day

420.00

1 day

2nd Class Mason

0.167 day

375.00

1 day

62.63

Mazdoor (Both Men and Women)

5.600 day

320.00

1 day

1792.00

Sub Total of - B

70.14

1924.77

C. MACHINERY
Weigh batcher hire charges, machine mixing charges

1.333 hour

338.60

1 hour

451.35

Vibrator hire charges

1.333 hour

175.40

1 hour

233.81

103.00

1 kl

123.60

Water (including for curing)

1.20 kl
Sub Total of - C

808.76

BASIC COST per 1 cum

6543.15

D. Overheads & Contractors Profit

14%
Total

337269598.xlsx Bld up to 3F

890.85
7434.00

Page 137 of 3205


Rate per One Cum
a

Rs

Columns up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum

1.00 Cum

6543.15

1 Cum

6543.15

Material charges for Centering & Scaffolding, Pg No.75 (Steel scaffolding)

1.00 Cum

341.00

1 Cum

341.00

Labour charges for Centering & Scaffolding,Pg No.75

1.00 Cum

1603.00

1 Cum

1603.00

Add Labour component @

20%

320.60

Basic Cost
Overheads & Contractors Profit

Rs
14%

VAT & Labour cess


Rate per One Cum
7

7434.00

8807.75
1199.18

0%
Rs

0.00
10006.93

BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including
pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.
for RCC SLABS, BEAMS

RCC SLABS, BEAMS


A. MATERIALS:
20mm HBG graded metal
Sand
Cement

0.80 cum
0.40 cum
350.00 Kgs

1854.81
791.93
5.74

1 Cum
1 Cum
1 Cum

1483.85
316.77
2009.00
3809.62

0.067 day
0.133 day
3.077 day

420.00
375.00
320.00

1 Cum
1 Cum
1 Cum

28.14
49.88
984.64
1062.66

0.308 hour
0.308 hour
1.200 kl

338.60
175.40
103.00

1 Cum
1 hour
1 Cum

104.29
54.02
123.60
281.91
5154.19
701.74
5855.93
5855.93

Sub Total of - A
B. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)
Sub Total of - B
C. MACHINERY
Weigh batcher hire charges, machine mixing charges
Vibrator hire charges
Water (including for curing)
Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit

14%
Total

Rate per One Cum


A
A-I

RCC SLABS

iv

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

Rs

RCC Slabs up to 3.66 Mts unsupported height above GL


125 mm
1.00 Cum
8.00 Sqm
8.00 Sqm
20%

Thick
5154.19
227.00
152.00

0.125 m
1 Cum
1 Sqm
1 Sqm

Sub - Total
Overheads & Contractors Profit
VAT & Labour cess
Rate per One Cum
B
i

Rs
14%
0%
Rs

RCC Beams:
RCC Beams up to 3.66 Mts height
R.C.C. M 20 Per Cum
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

5154.19
2002.00
1344.00

1 Cum
1 Cum
1 Cum

Sub - Total
Overheads & Contractors Profit
VAT & Labour cess
Rate per One Cum
8

Rs
14%
0%
Rs

5154.19
1816.00
1216.00
243.20
8429.39
1147.66
0.00
9577.05

5154.19
2002.00
1344.00
268.80
8768.99
1193.9
0.00
9962.89

BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade
as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in
position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per
approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including
cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage

1.05 Ton
337269598.xlsx Bld up to 3F

34000.00

1 Ton

35700.00

Page 138 of 3205


Binding wire- SSR (Irrigation) item No 3, Pg 233
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing and
placing in position
Blacksmith / Bar bender
Mazdoor (Unskilled)
Add Labour component @
(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
VAT & Labour cess
Rate per One MT
Rate per One Kg

70.00

1 kg

10.00 day
10.00 day
20%
14%

490.00
320.00

1 day
1 day

420.00

4900.00
3200.00
1620.00
6417.60
52257.60
0.00
52258.00
52.26

1 MT
0%
Sub Total:

Rs.
MASONRY
BLD-CSTN-5-1 (39) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:3 Prop including Cost & conveyance of
all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor,
scaffoding charges lift charges , curing charges etc., complete for finished item of work
A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)

96.00 Kg
512 Nos
0.20 Cum

5.74
4700.00
791.93

0.24 day.
0.56 day.
1.89 day.

420.00
375.00
320.00

1 Kg
1000 Nos
1 Cum

551.04
2406.40
158.39
3115.83

Sub Total of - A
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

1 day.
1 day.
1 day.

Sub Total of - B
Total A+B
c.Overheads & Contractors Profit
VAT & Labour cess
Grand Total
Rate per One Cum

Rs
14%
0%
Rs

100.80
210.00
604.80
915.60
4031.43
548.88
0.00
4580.31
4580.31

10

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of
all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor,
scaffoding charges lift charges , curing charges etc., complete for finished item of work

Ground moulded size 23x11x7 Cm - (1:6)

Ground moulded size 23x11x7 Cm - (1:6)

6.00 kg

A. MATERIALS:

15

BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all
materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and
shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Sub-Total
VAT & Labour cess
Grand Total
Rate per One Cum

A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Add Labour component @
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & Labour cess
Rate per One Cum
16

48.00 Kg
512 Nos
0.20 Cum

5.74
4700.00
791.93

0.24 day.
0.56 day.
1.89 day.

420.00
375.00
320.00

1 Kg
1000 Nos
1 Cum

275.52
2406.40
158.39

1 day.
1 day.
1 day.
Rs

14%
0%
Rs

100.80
210.00
604.80
3755.91
511.37
4267.28
0.00
4267.28
4267.28

76.80 Kg
0.94 Cum
0.16 Cum
0.32 Cum

5.74
1112.81
1922.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

440.83
1046.04
307.65
253.42

1.50 day
2.32 day
20%

420.00
320.00

1 day
1 day

630.00
742.40
274.48
3694.82
503.05
4197.87
0.00
4197.87

Rs
13.615%
0%
Rs

BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like
Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing
of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone

59.40 Kg
0.44 Cum

337269598.xlsx Bld up to 3F

5.74
1112.81

1 Kg
1 Cum

340.96
489.64

Page 139 of 3205


Rough Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Add Labour component @
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & Labour cess
Rate per One Cum

18

448.41
307.65
261.34

1.20 day
2.00 day
20%

420.00
320.00

1 day
1 day

504.00
640.00
228.80
3220.80
438.51
3659.31
0.00
3659.31

Rs
13.615%
0%
Rs

28.80 Kg
0.06 Cum

5.74
791.93

1 Kg
1 Cum

165.31
47.52

0.50 day
0.74 day
20%

375.00
320.00

1 day
1 day

187.50
236.80
84.86
721.99
98.3
820.29
0.00
82.03

Rs
13.615%
0%
Rs

0.15 Cum

3733.88

1 Cum

560.08

0.60 day
0.96 day

420.00
320.00

1 day
1 day

252.00
307.20
1119.28
152.39
1271.67
0.00
1271.67

Rs
14%
0%
Rs

BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage
charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc.,
complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & Labour cess
Rate per 10 Sqm

19

1 Cum
1 Cum
1 Cum

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, seigniorage
charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc.,
complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & Labour cess
Rate per 10 Sqm

18

896.81
1922.81
791.93

POINTING AND PLASTERING


BLD-CSTN-7-3-(74) : Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including cost & conveyance of all materials to site ,
seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item of work
A. MATERIALS:
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Add Labour component @
Total
C.Overheads & Contractors Profit
Sub-Total
VAT & Labour cess
Rate per 10 Sqm

17

0.50 Cum
0.16 Cum
0.33 Cum

0.15 Cum

3045.08

1 Cum

456.76

0.60 day
0.96 day

420.00
320.00

1 day
1 day

252.00
307.20
1015.96
138.32
1154.28
0.00
1154.28

14%
0%
Rs

BLD-CSTN-8-9-(84) ; Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge
finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour
charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of
uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
Cement
Fine aggregate (Sand)
Top Coat in CM(1:4), 4 mm thick
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total

43.00 Kg
0.18 Cum

5.74
791.93

1 Kg
1 Cum

246.82
142.55

14.50 Kg
0.04 Cum

5.74
791.93

1 Kg
1 Cum

83.23
31.68

0.63 day
1.47 day
3.90 day

420.00
375.00
320.00

1 day
1 day
1 day
Rs

337269598.xlsx Bld up to 3F

264.60
551.25
1248.00
2568.13

Page 140 of 3205


C.Overheads & Contractors Profit
Sub-Total
VAT & Labour cess
Rate per 10 Sqm

14%
0%
Rs

349.65
2917.78
0.00
2917.78

FLOORING, DADOING, CLADING & SKIRTING


20

BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid
CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including
cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring
stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Polished Shahabad/ Tandur stone slabs of 15 to 18 mm thick (0.457x 0457)
BMT-B.05-Sn.26
Cement for CM (1:8) proportion for base coat
Cement for slurry
Cement for jointing
Sand for CM (1:8) proportion
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Add Labour component @
Add water charges 1%
Grand Total
over heads & contractors profit
Sub-Total
VAT & Labour cess
Rate per 10 Sqm

21

11.00 sqm

1654.00

10 sqm

1819.40

21.60 kg.
33.00 kg.
20.00 kg.
0.12 cum

5.74
5.74
5.74
791.93

1 kg.
1 kg.
1 kg.
1 cum

123.98
189.42
114.80
95.03

3.10 day
1.10 day
0.86 day
20%

420.00
375.00
320.00

1 day
1 day
1 day

1302.00
412.50
275.20
397.94
43.32
4773.59
649.92
5423.51
0.00
5423.51

Rs
13.615%
0%
Rs

BLD-CSTN-9-13-(111): Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC
bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes
and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item
of work.
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed)
Cement
Sand
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

0.17 Cum
120.00 Kg
0.085 Cum

1563.81
5.74
791.93

1 Cum
1 Kg
1 Cum

265.85
688.80
67.31

1.25 day
0.06 day
3.00 day

420.00
375.00
320.00

1 day
1 day
1 day

525.00
22.50
960.00
2529.46
25.29
2554.75
347.83
2902.58
0.00
2902.58

Rs
Add water charges 1%
Total
over heads & contractors profit
Sub-Total
Add Labour Cess @
Rate per 10 Sqm
22

1.00%
14%
0%
Rs

WATER PROOFING AND PAINTING


BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of
cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all
operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,,
complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3
Water proof compound - BMT-H.01
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Total
over heads & contractors profit
Sub-Total
Add Labour Cess @
Rate per 10 Sqm

23

0.210 Cum
2.000 Kg

3733.88
52.00

1 Cum
1 Kg

784.11
104.00

0.660 day
1.540 day
3.70 day

420.00
375.00
320.00

1 day
1 day
1 day

277.20
577.50
1184.00
2926.81
398.49
3325.30
0.00
3325.30

Rs
14%
0%
Rs

BLD-CSTN-11-5-(162): White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for
finished item of work, but excluding conveyance charges of materials
Whiting / White Cement
Gum, conjee water, or prickly pear juice including necessary fire wood

2.00 Kg
LS

337269598.xlsx Bld up to 3F

29.00

1 Kg

58.00
10.00

Page 141 of 3205


Brick Layers / Painter
Mazdoor (unskilled)
Add Labour component @

0.21 day
0.32 day
20%

Sundries including brushes, ladders, etc.,

420.00
320.00

1 day
1 day

1%
Rs

over heads & contractors profit


Sub-Total
Add Labour Cess @
Rate per 10 Sqm

13.615%
0%
Rs
Rs

Rate per 1Sqm


24

BLD-CSTN-12-3-(170): Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours)
making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and
conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.
Cost of white wash one coat
Cost of Snowcem paint - BMT-J.24

2.00 Kg
0.09 day
0.21 day
1.50 day
1%

1st class painter


2nd class painter
Mazdoor (unskilled)
Add sundries including brushes etc @
over heads & contractors profit
Sub-Total
Add Labour Cess @
Rate per 10 Sqm

50.00
480.00
375.00
320.00

25 Kg
1 day
1 day
1 day

14%
0%
Rs
Rs

Rate per 1Sqm


25

88.20
102.40
38.12
296.72
2.97
299.69
40.8
340.49
0.00
340.49
34.05

0.00
4.00
43.20
78.75
480.00
6.06
612.01
83.33
695.34
0.00
695.34
69.53

BLD-CSTN-11-10-(167); Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of
appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose
powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of
work as per SS 911 for internal walls
PRIMARY COAT:
Cost of Oil bound Distemper Primer -BMT-J.01
Painter I st class
Pianter II nd class
Add Labour component @
Cost of washable Oil Bound Distemper -BMT-J.21
1st class painter
II class painter
Grand Total
over heads & contractors profit
Sub-Total
Add Labour Cess @
Rate per 10 Sqm

0.50 Kg
0.08 day
0.19 day
20%
1.70 Kg
0.36 day
0.84 day

144.00
480.00
375.00

1 Kg
1 day
1 day

87.00
480.00
375.00

1 Kg
1 day
1 day
Rs

13.615%
0%
Rs

72.00
38.40
71.25
21.93
147.90
172.80
315.00
839.28
114.27
953.55
0.00
953.55

DOORS , WINDOWS AND VENTILATORS


26

Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the
ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers,
bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with
one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108
Rate as per SSR Item No. 156,Pg 18 -BMT-F.29
over heads & contractors profit
Sub-Total
VAT & Labour cess
Rate per 1 Sqm

1.00 Sqm
14%

2861.00

1 Sqm

0%
Rs

337269598.xlsx Bld up to 3F

2861.00
400.54
3261.54
0.00
3261.54

KANDUKUR MUNICIPALITY
Construction Of Mutton Market
GENERAL ABSTRACT
S.No

Description of Items

Construction of Mutton Market

Construction of Compound Wall

Quantity
1

Sub Total
3

Provision for Internal Electrification @ 3%

Add VAT @ 5%

Add Labour Cess @ 1%

Provision towards Scrutiny Charges @ 3%

Provision towards Consultancy charges @ 1.5 %

Provision towards Unforseen items of works and Price Escalation


Total Project Cost
Say as

NDUKUR MUNICIPALITY

struction Of Mutton Market

GENERAL ABSTRACT
Quantity
No

Amount in Rs.
3651413.00
762023.00

Rs.

4413436.00
109542.39
220672.00
44134.00
132403.00
66201.54
13611.07

Rs.

5000000.00
50.00 Lakhs

Page 144 of 3205

KANDUKUR MUNCIPALITY
CONSTRUCTION OF KANDUKUR MUNCIPAL MUTTON MARKET

Detailed and Abstract Estimate for Civil Works


S.No.

Description of Item

Nos

GROUND FLOOR
*

Earth work excavation for Footings


for Footings

33

2.20

2.20

1
1
1
1

x
x
x
x

2
2
2
2

5.50
4.60
4.40
4.60

0.60
0.60
0.60
0.60

1
1

x
X

18
1

4.27
76.00

3.07
2.00

RBR-FNDN-1 -manual means :Earthwork excavation for structures in all types of soil as per drawing and technical
specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated
suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers,
Footings and Man Holes etc. by manual means,
100% of the Total Qty
Earth work excavation for Foundations
R.R.S. Masonry for outer long walls block I
R.R.S. Masonry for outer Short walls block I
R.R.S. Masonry for outer long walls block II
R.R.S. Masonry for outer Short walls block II

BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc.
complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B
(APSS 308).
100% of the Total Qty
BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers
not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
Gravel Filling in the basement
PASSAGE
337269598.xlsx KANDUKUR MUTTON MARKET

144

Page 145 of 3205

S.No.

Description of Item

BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate:
coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing
etc., complete for finished item of work.for foundation and under flooring bed.

Footings for Rectangular Columns

33

2.20

2.20

Below RRS Masonry all round the building


R.R.S. Masonry for outer long walls block I
R.R.S. Masonry for outer Short walls block I
R.R.S. Masonry for outer long walls block II
R.R.S. Masonry for outer Short walls block II

1
1
1
1

x
x
x
x

2
2
2
2

15.00
8.40
12.00
8.40

0.60
0.60
0.60
0.60

1
1

x
X

18
1

4.27
76.00

3.07
2.00

Nos

Flooring Bed In Building

Total a + b
5

BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with
minimum cement content as per IS code fo FOUNDATIONS, PLINTH, PEDESTALS

Footings
Footings for Rectangular Columns

33

2.00

2.00

Plinth Beams
PB long walls block I
PB SHORT walls block I

1
1

x
x

3
6

15.00
8.40

0.23
0.23

337269598.xlsx KANDUKUR MUTTON MARKET

145

Page 146 of 3205

S.No.

Description of Item
PB long walls block II
PB SHORT walls block II

BLD-CSTN-3-15- ( 31 ) -B ; Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with
minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS

Columns of GF
C1 Columns

BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with
minimum cement content as per IS code from standard suppliers approved by the department including pumping,
centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication
charges for finished item of work. for RCC SLABS, BEAMS

Roof Beams of GF
RB long walls block I
RB SHORT walls block I
RB long walls block II
RB SHORT walls block II

1
1

x
x

Nos
3
5

L
12.00
8.40

33

0.30

0.30

1
1
1
1

x
x
x
x

3
6
3
5

15.00
8.40
12.00
8.40

0.23
0.23
0.23
0.23

0.23
0.23

Roof Slab 125mm thick- GF


337269598.xlsx KANDUKUR MUTTON MARKET

146

Page 147 of 3205

S.No.

Description of Item

Nos

BLOCK I
BLOCKII
8

1
1

x
x

1
1

L
16.80
13.50

B
10.20
10.20

1
1
1
1

x
x
x
x

2
2
2
2

15.00
8.40
12.00
8.40

0.45
0.45
0.45
0.45

2
2
2
2

15.00
8.40
12.00
8.40

0.45
0.45
0.45
0.45

BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone
including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage
Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor
,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
STEP I
R.R.S. Masonry for outer long walls block I
R.R.S. Masonry for outer Short walls block I
R.R.S. Masonry for outer long walls block II
R.R.S. Masonry for outer Short walls block II

STEP II
R.R.S. Masonry for outer long walls block I
R.R.S. Masonry for outer Short walls block I
R.R.S. Masonry for outer long walls block II
R.R.S. Masonry for outer Short walls block II

1
1
1
1

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of
Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges
lift charges , curing charges etc., complete for finished item of work

Brick Masonry in GF - 230mm thick


BRICK long walls block I
BRICK SHORT walls block I
BRICK long walls block II
BRICK SHORT walls block II
Deductions for openings
ROLLING SHUTTERS

337269598.xlsx KANDUKUR MUTTON MARKET

x
x
x
x

1
1
1
1

x
x
x
x

3
6
3
5

15.00
8.40
12.00
8.40

0.23
0.23
0.23
0.23

-1

18

2.40

0.23

147

Page 148 of 3205

S.No.
Description of Item
10
BLD-CSTN-8-9-(84) ; Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement,
Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing
mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete
for finished item of work of uneven surfaces of walls. (External walls)
a

Outer Walls of GF
BLOCK I
BLOCK II
Deductions
ROLLING SHUTTERS

11

BLD-CSTN-8-2-(77) ; Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.

Inner walls of GF
BLOCK I
BLOCK II
Deductions:
Rolling Shutters

12

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for
finished item of work. (As per SS 903). per 10 Sqm.

Ceiling of GF
CANTILEVER EXTENTION

Nos

1
1

x
x

1
2

52.20
22.80

-1

18

2.40

1
1

x
x

10
8

14.68
14.68

-1

18

2.40

1
1

x
X

18
1

4.27
121.50

3.07
0.45

Add 5 % Extra for Beams

337269598.xlsx KANDUKUR MUTTON MARKET

148

Page 149 of 3205

S.No.
Description of Item
13
BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs)
set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey
like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials
like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for
dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all
materials.

14

Nos

BLD-CSTN-9-13-(111) : Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard
granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not
exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining
including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges,
etc., complete for finished item of work.
1

15

63.00

BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including
labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including
all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying
including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

For Footing
For Columns
For Plinth Beams
For Roof Beams
For Slabs

39.60 Cum
16.56 Cum
11.97 Cum
10.98 Cum
38.63 Cum

337269598.xlsx KANDUKUR MUTTON MARKET

40.00
140.00
120.00
120.00
90.00

149

Page 150 of 3205

S.No.
Description of Item
16
BLD-CSTN-12-3-(170) ; Painting Walls with approved Water Proof Cement Paint over Priming Coat, One Coat (All
Colours) making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and
remains of loose powdered materials, including cost and conveyance of all materials to work site and all
operational, incidental, labour charges etc. complete for finished item of work as per SS 912.
Rest of the three sides of building
Add for Sun shades
Add extra
17

Nos

1.05

18

2.40

0.60

BLD-CSTN-11-10-(167) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give
an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials,
including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.
complete for finished item of work as per SS 911 for internal walls
Internal plastering Qty.

18

BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all
materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work,
but excluding conveyance charges of materials
Internal Plastering as per item #12

19

20

Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through
their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of
50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates
and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs
complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for
finished item of work as per special spn: 1108
ROLLING SHUTTERS

BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick
with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials,
seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and
labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall
and slab etc,, complete for finished item of work

337269598.xlsx KANDUKUR MUTTON MARKET

150

Page 151 of 3205

S.No.

Description of Item

Nos

Cost
Total Cost

337269598.xlsx KANDUKUR MUTTON MARKET

151

Page 152 of 3205

UKUR MUNCIPALITY

ANDUKUR MUNCIPAL MUTTON MARKET

stract Estimate for Civil Works


D

Quantity

2.50

Unit

Amount

158.81

1 Cum

63413.00

258.06

1 Cum

2366.00

2.64
2.21
2.11
2.21
9.17 Cum

9.17 Cum

0.30
0.30

Per

399.30
399.30 Cum

399.30 Cum

0.40
0.40
0.40
0.40

Rate

70.79
45.60
337269598.xlsx KANDUKUR MUTTON MARKET

152

Page 153 of 3205

Quantity
Unit
116.39 Cum

0.15

0.10
0.10
0.10
0.10

0.10
0.10
Total a + b + c

0.30

0.30
0.30

Rate
367.31

Per
1 Cum

Amount
42751.00

23.60
15.20
38.80
68.02 Cum

4409.17

1 Cum

299912.00

39.60
39.60 Cum

8019.59

1 Cum

317576.00

23.96
23.96 Cum
1.80
1.01
1.44
1.01
5.26

3.11
3.48
337269598.xlsx KANDUKUR MUTTON MARKET

153

Page 154 of 3205

D
0.30
0.30

5.58

0.28
0.28
0.28
0.28
Total

Quantity
2.48
2.90

Unit

Rate

Per

11.97 Cum

10079.21

1 Cum

120648.00

16.56
16.56 Cum

10006.93

1 Cum

165715.00

2.85
3.19
2.28
2.66
10.98 Cum

9962.89

1 Cum

109393.00

337269598.xlsx KANDUKUR MUTTON MARKET

Amount

154

Page 155 of 3205

D
0.13
0.13

Quantity
Unit
21.42
17.21
38.63 Cum

0.30
0.30
0.30
0.30

4.05
2.27
3.24
2.27

0.30
0.30
0.30
0.30

4.05
2.27
3.24
2.27

23.66 Cum

2.85
2.85
2.85
2.85
2.85
Total

Rate

Per

Amount

9577.05

1 Cum

369961.00

3659.31

1 Cum

86579.00

4267.28

1 Cum

364212.00

29.50
33.04
23.60
27.53
-28.32
85.35 Cum

337269598.xlsx KANDUKUR MUTTON MARKET

155

Page 156 of 3205

Quantity

3.85
3.85
2.40
Total

Unit

Rate

Per

Amount

2917.78

10 Sqm

79612.00

1154.28

10 Sqm

83347.00

1271.67

10 Sqm

38460.00

200.97
175.56
-103.68
272.85 Sqm

3.13
3.13

458.75
367.00

2.40
Total

-103.68
722.07

1.00
1.00

235.96
54.68

Sqm

11.80
302.44 Sqm

337269598.xlsx KANDUKUR MUTTON MARKET

156

Page 157 of 3205

Quantity

2.00

Kg/Cum
Kg/Cum
Kg/Cum
Kg/Cum
Kg/Cum
Total

Unit

Rate

Per

Amount

235.96 Sqm

5423.51

10 Sqm

127973.00

126.00
126.00 Sqm

2902.58

1 Sqm

365725.00

1 Kg

529556.00

1584.00 Kg
2318.40 Kg
1436.40 Kg
1317.60 Kg
3476.70 Kg
10133.10 Kg

52.26

337269598.xlsx KANDUKUR MUTTON MARKET

157

Page 158 of 3205

Quantity

Unit

Rate

Per

Amount

Total

272.85
1.89
20.00
294.74 Sqm

695.34

10 Sqm

20494.00

Total

722.07
722.07 Sqm

953.55

10 Sqm

68853.00

Total

302.44
302.44 Sqm

340.49

10 Sqm

10298.00

86.40
86.40 Sqm

3261.54

1 Sqm

281797.00

2.40

337269598.xlsx KANDUKUR MUTTON MARKET

158

Page 159 of 3205

Quantity
Unit
309.06 Sqm

Rate
3325.30

Per
10 Sqm

337269598.xlsx KANDUKUR MUTTON MARKET

Amount
102772.00
3651413.00
3651413.00

159

Page 160 of 3205

Kandukur Municipality
DATA BASED ON - 2014 - 2015 SSR
20/02/16
I

DETAILED AND ABSTRACT ESTIMATE FOR THE CONSTRUCTION OF VALVE CHAMBER FOR DISTRIBUTION LINES ( 0.90 Mts at bottom,
Dia

Radius

inner dia of Corbelling portion at top


Inner dia of Corbelling portion at bottom
Outer dia of Corbelling portion at Top
Outer dia of Corbelling portion at bottam
Earth work
Dia of CC bed

0.5
0.90
0.7
1.10
1.30
1.3

S.N

Description

No

RBR-FNDN-1: Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for
Sumps, Thrust Blocks and Man Holes etc,.
x 0.65 x 1.10

0.25
0.45
0.35
0.55
0.65
0.65

3.14

r2
0.4225

3.14

r2
0.4225

1.10

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring bed.

x 0.65 x 0.20

337269598.xlsx data-Chamber-1

0.10

Page 161 of 3205

BLD-CSTN-2-11-Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix
(1:2:4) prop (Cement : fine aggregate: coarse aggregate ) using 12mm size Hard Granite Machine
Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing ,
laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work

for ring of size 0.90 Mts at bottom,0.50 at top, 125mm thick and 1.00 m height with nomonal
reinforcement For precast Gummy
x(( (0.555 -0.45)+ (0.35 -0.25))/2 x 1

b
4

for fixing the Man hole frame 2x r x t x h


Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers and frames
anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site ,central excise
duty,but excluding sales tax, octroi and other Govt levies etc., as applicable.ISI mark

RCC Cover 500mm dia clear opening


Add for transportation and Labour charges for fixing etc

337269598.xlsx data-Chamber-1

3.14

0.03

0.15

Page 162 of 3205

II

CONSTRUCTION OF SLUICE VALVE CHAMBER 200mm to 350mm DIA PIPE LINE


Description

No

Size in Mts

B
1.40

Wall thick ness in Mts


1

RBR-FNDN-1: Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for
Sumps, Thrust Blocks,Chambers and Man Holes etc,.

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring bed.

D
1.40

1.25

0.20

2.00

2.00

1.40

2.00

2.00

0.15

1
1

x
x

2
2

1.80
1.40

0.20
0.20

1.25
1.25

BLD-CSTN-2-11-Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix
(1:2:4) prop (Cement : fine aggregate: coarse aggregate ) using 12mm size Hard Granite Machine
Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing ,
laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc.,
complete for finished item of work. for walls
Walls
Long Walls
Short Walls

337269598.xlsx data-Chamber-1

Page 163 of 3205

BLD-CSTN-3-13-(30)-C: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)


corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
& other taxes on all materials including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work, but excluding centering, shuttering . for RCC SLABS, BEAMS

337269598.xlsx data-Chamber-1

Page 164 of 3205

Chamber cover not exceeding 0.45m width with hooks for lifting
5

1.80

1
1

x
x

1
1

1.60
0.39

1
1

x
x

4
1

1.40
1.40

0.45

0.12

BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated
(TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters
for RCC works , including labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs
and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending, placing in position, tying including
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS
No.126

Nominal steel for walls@20Kg/Cum


Steel for Cover Slab @ 100 Kg/Cum
6

20.00
100.00

Kg/Cum
Kg/Cum

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost
and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing,
scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
Inside chamber
Flooring
Total for each Chamber

337269598.xlsx data-Chamber-1

1.25
1.40

Page 165 of 3205

III

CONSTRUCTION OF SLUICE VALVE CHAMBER 400mm to 650mm DIA PIPE LINE


Description

No

Size in Mts
1

B
1.60

Wall thick ness in Mts


RBR-FNDN-1: Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for
Sumps, Thrust Blocks,Chambers and Man Holes etc,.

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring bed.

BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix
M-20 prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine
Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing ,
laying, finishing top surface to the required level curing etc., complete for finished item of work with
nomonal reinforcement

Walls
Long Walls
Short Walls

337269598.xlsx data-Chamber-1

D
1.60

1.35

0.250

2.30

2.30

1.50

2.30

2.30

0.15

1
1

x
x

2
2

2.10
1.60

0.25
0.25

1.35
1.35

Page 166 of 3205

BLD-CSTN-3-13-(30)-C: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)


corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
& other taxes on all materials including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work, but excluding centering, shuttering . for RCC SLABS, BEAMS

Chamber cover not exceeding 0.45m width with hooks for lifting
5

2.10

1
1

x
x

1
1

2.50
0.53

1
1

x
x

4
1

1.60
1.60

0.45

0.12

BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated
(TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters
for RCC works , including labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs
and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending, placing in position, tying including
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS
No.126

nominal steel for walls@20Kg/Cum


Steel for Cover Slab @ 100 Kg/Cum
6

20.00
100.00

Kg/Cum
Kg/Cum

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost
and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing,
scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
Inside chamber
Flooring
Total for each Chamber

337269598.xlsx data-Chamber-1

1.35
1.60

Page 167 of 3205

IV

CONSTRUCTION OF SLUICE VALVE CHAMBER 700mm to 1000mm DIA PIPE LINE


Description

No

Size in Mts

B
2.00

Wall thick ness in Mts


1

D
2.00

1.45

0.30

RBR-FNDN-1: Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for
Sumps, Thrust Blocks,Chambers and Man Holes etc,.

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour
charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
level curing etc., complete for finished item of work.for foundation and under flooring bed.

BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate: coarse aggregate ) using
20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, finishing top surface to the required level curing etc.,
complete for finished item of work with nomonal reinforcement

Walls
Long Walls
Short Walls

337269598.xlsx data-Chamber-1

2.90

2.90

1.60

2.90

2.90

0.15

1
1

x
x

2
2

2.60
2.00

0.30
0.30

1.45
1.45

Page 168 of 3205

BLD-CSTN-3-13-(30)-C: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)


corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal
(coarse aggregate) from approved quarry including cost and conveyance of all materials like cement,
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
& other taxes on all materials including all operational, incidental and labour charges such as
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work, but excluding centering, shuttering . for RCC SLABS, BEAMS

Chamber cover not exceeding 0.45m width with hooks for lifting
5

2.60

1
1

x
x

1
1

4.00
0.81

1
1

x
x

4
1

2.00
2.00

0.45

0.12

BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated
(TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters
for RCC works , including labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs
and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending, placing in position, tying including
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS
No.126

nominal steel for walls@20Kg/Cum


Steel for Cover Slab @ 100 Kg/Cum
6

20.00
100.00

Kg/Cum
Kg/Cum

BLD-CSTN-6-4 : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost
and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing,
scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
Inside chamber
Flooring
Total for each Chamber

337269598.xlsx data-Chamber-1

1.45
2.00

Page 169 of 3205

90 Mts at bottom,0.50 at top 1.00 Mts Depth )


Depth

Wall Thick
1.00

0.100

0.10
Qty

Rate

Per

Amount

Data WS New
S.No.8

1.460 Cum

158.81

1 Cum

232.00

1 Cum

538.00

Data WS New
S.No.29

0.130 Cum

4138.13

337269598.xlsx data-Chamber-1

Page 170 of 3205

Data WS New
S.No.31

1 No

0.030 Cum

2835.99

1 No

4935.06

1 Cum

2836.00

148.00

Data WS New
S.No.193

1 No

2607.90

1 No

Total Rs

1050.00
120.00
4924.00

337269598.xlsx data-Chamber-1

Page 171 of 3205

Qty

Rate

Per

Amount

Data WS New
S.No.8

5.60 Cum

158.81

1 Cum

889.00

1 Cum

2483.00

1 Cum

16933.00

Data WS New
S.No.29

0.60 Cum

4138.13

Data WS New
S.No.31

0.90
0.70
1.60 Cum

10583.31

337269598.xlsx data-Chamber-1

Page 172 of 3205

Data WS New
S.No.34

337269598.xlsx data-Chamber-1

Page 173 of 3205

0.39 Cum

6803.71

1 Cum

2653.00

1 Kg

3698.00

10 Sqm

1148.00
27804.00
27804.00

Data WS New
S.No.40

32.00
39.00
71.00 Kg

52.08
Data WS New
S.No.35

7.00
1.96
8.96 Sqm

1281.35

Say Rs.

337269598.xlsx data-Chamber-1

Page 174 of 3205

Qty

Rate

Per

Amount

Data WS New
S.No.8

7.94 Cum

158.81

1 Cum

1261.00

1 Cum

3269.00

1 Cum

26458.00

Data WS New
S.No.29

0.79 Cum

4138.13

Data WS New
S.No.31

1.42
1.08
2.5 Cum

10583.31

337269598.xlsx data-Chamber-1

Page 175 of 3205

Data WS New
S.No.34

0.53 Cum

6803.71

1 Cum

3606.00

1 Kg

5364.00

10 Sqm

1435.00
41393.00
41393.00

Data WS New
S.No.40

50.00
53.00
103.00 Kg

52.08
Data WS New
S.No.35

8.64
2.56
11.20 Sqm

1281.35

Say Rs.

337269598.xlsx data-Chamber-1

Page 176 of 3205

Qty

Rate

Per

Amount

Data WS New
S.No.8

13.46 Cum

158.81

1 Cum

2138.00

1 Cum

5214.00

1 Cum

42333.00

Data WS New
S.No.29

1.26 Cum

4138.13

Data WS New
S.No.31

2.26
1.74
4.00 Cum

10583.31

337269598.xlsx data-Chamber-1

Page 177 of 3205

Data WS New
S.No.34

0.81 Cum

6803.71

1 Cum

5511.00

1 Kg

8385.00

10 Sqm

1999.00
65580.00
65580.00

Data WS New
S.No.40

80.00
81.00
161.00 Kg

52.08
Data WS New
S.No.35

11.60
4.00
15.60 Sqm

1281.35

Say Rs.

337269598.xlsx data-Chamber-1

Page 178 of 3205

23.S.S. RATES FOR DUCTILE IRON PRESSURE PIPES


Based on CSSR 2015-16
A

for the month of

Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working
suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation,

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

DI K7 PIPES for 5.50Mts working length

Sl
No

Nov-15

Dia of Pipes

Basic Rate of Market Rate of SSR Rate of Pig


Pipe per Rmt Pig Iron / MT
Iron / MT

P1

R2

R1

Weight of
Pipe per 1
Rmt

Actual Rate of
Pipe per Rmt

P2

Transp't
charges
/Rmt/Km

Total
Transport
charges for

CED @

Add ST @

150 Km

12.50%

5%

100mm dia

891.00

21000

27500

13.27

808.20

0.22

33.00

101.03

40.41

150mm dia

1233.00

21000

27500

19.64

1110.45

0.33

49.50

138.81

55.52

200mm dia

1721.00

21000

27500

25.82

1559.88

0.33

49.50

194.99

77.99

250mm dia

2307.00

21000

27500

34.00

2094.84

0.44

66.00

261.86

104.74

300mm dia

2965.00

21000

27500

43.09

2696.12

0.66

99.00

337.02

134.81

350mm dia

3731.00

21000

27500

53.64

3396.29

0.77

115.50

424.54

169.81

400mm dia

4528.00

21000

27500

64.36

4126.39

0.88

132.00

515.80

206.32

450mm dia

5447.00

21000

27500

75.82

4973.88

1.10

165.00

621.74

248.69

500mm dia

6493.00

21000

27500

89.09

5937.08

1.32

198.00

742.14

296.85

10

600mm dia

8640.00

21000

27500

117.82

7904.80

1.87

280.50

988.10

395.24

11

700mm dia

11180.00

21000

27500

150.00

10244.00

2.75

412.50

1280.50

512.20

12

750mm dia

12527.00

21000

27500

166.91

11485.48

3.30

495.00

1435.69

574.27

13

800mm dia

13843.00

21000

27500

186.55

12678.93

5.61

841.50

1584.87

633.95

14

900mm dia

16891.00

21000

27500

226.55

15477.33

5.61

841.50

1934.67

773.87

15

1000mm dia

20020.00

21000

27500

270.55

18331.77

5.61

841.50

2291.47

916.59

337269598.xlsx -DI & MS pipes

Page 179 of 3205

Sl
No

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

DI K7 PIPES for 6.00Mts working length

Dia of Pipes

Basic Rate of
Market Rate of SSR Rate of Pig
Pipe per Rmt
Pig Iron / MT
Iron / MT
as per SSR

P1

R2

R1

Weight of
Pipe per 1
Rmt

Actual Rate of
Pipe per Rmt

P2

Transp't
charges
/Rmt/Km

Total
Transport
charges for

CED @

Add ST @

150 Km

12.50%

5.00%

100mm dia

891.00

21000.00

27500.00

13.17

808.82

0.22

33.00

101.10

40.44

150mm dia

1233.00

21000.00

27500.00

19.50

1111.32

0.33

49.50

138.92

55.57

200mm dia

1721.00

21000.00

27500.00

25.67

1560.82

0.33

49.50

195.10

78.04

250mm dia

2307.00

21000.00

27500.00

33.83

2095.90

0.44

66.00

261.99

104.80

300mm dia

2965.00

21000.00

27500.00

42.83

2697.74

0.66

99.00

337.22

134.89

350mm dia

3731.00

21000.00

27500.00

53.33

3398.22

0.77

115.50

424.78

169.91

400mm dia

4528.00

21000.00

27500.00

63.83

4129.70

0.88

132.00

516.21

206.49

450mm dia

5447.00

21000.00

27500.00

75.17

4977.94

1.10

165.00

622.24

248.90

500mm dia

6493.00

21000.00

27500.00

88.50

5940.76

1.32

198.00

742.60

297.04

10

600mm dia

8640.00

21000.00

27500.00

116.83

7910.98

1.87

280.50

988.87

395.55

11

700mm dia

11180.00

21000.00

27500.00

148.83

10251.30

2.75

412.50

1281.41

512.57

11

750mm dia

12527.00

21000.00

27500.00

165.67

11493.22

3.30

495.00

1436.65

574.66

13

800mm dia

13843.00

21000.00

27500.00

185.00

12688.60

5.61

841.50

1586.08

634.43

14

900mm dia

16891.00

21000.00

27500.00

224.67

15489.06

5.61

841.50

1936.13

774.45

15

1000mm dia

20020.00

21000.00

27500.00

268.17

18346.62

5.61

841.50

2293.33

917.33

1) Weights of DI pipes based on Table.8 of IS 8329/1994

337269598.xlsx -DI & MS pipes

Page 180 of 3205

DATA FOR DI K9 PIPES


Based on CSSR 2015-16
C

for the month of

Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working
suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportationa

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

DI K9 PIPES for 5.50 Mts working Length

Sl
No

Nov-15

Dia of Pipes

Basic Rate of
Weight of
Market Rate of SSR Rate of Pig
Pipe per Rmt
Pipe per
Pig Iron / MT
Iron / MT
as per SSR
1 Rmt

R2
21000.00

R1
27500.00

Actual Rate of
Pipe per Rmt

Transp't
charges
/Rmt/Km

Total
Transport
charges for

CED @

Add ST @

100mm dia

P1
1061.00

16.00

P2
961.16

0.22

150 Km
33.00

150mm dia

1568.00

21000.00

27500.00

24.18

1417.12

0.33

49.50

177.14

70.86

200mm dia

2093.00

21000.00

27500.00

32.55

1889.89

0.44

66.00

236.24

94.49

250mm dia

2746.00

21000.00

27500.00

42.73

2479.36

0.55

82.50

309.92

123.97

300mm dia

3479.00

21000.00

27500.00

54.18

3140.92

0.66

99.00

392.62

157.05

350mm dia

4336.00

21000.00

27500.00

67.45

3915.11

0.88

132.00

489.39

195.76

400mm dia

5228.00

21000.00

27500.00

80.91

4723.12

0.99

148.50

590.39

236.16

450mm dia

6256.00

21000.00

27500.00

96.36

5654.71

1.21

181.50

706.84

282.74

500mm dia

7278.00

21000.00

27500.00

112.00

6579.12

1.43

214.50

822.39

328.96

10

600mm dia

9598.00

21000.00

27500.00

147.82

8675.60

1.87

280.50

1084.45

433.78

11

700mm dia

12408.00

21000.00

27500.00

188.36

11232.63

2.75

412.50

1404.08

561.63

12

750mm dia

13925.00

21000.00

27500.00

211.45

12605.55

3.30

495.00

1575.69

630.28

13

800mm dia

15365.00

21000.00

27500.00

233.82

13905.96

5.61

841.50

1738.25

695.30

14

900mm dia

18741.00

21000.00

27500.00

283.82

16969.96

5.61

841.50

2121.25

848.50

15
16
17

1000mm dia
1100mm dia
1200mm dia

22215.00
23723.00
27738.00

21000.00
21000.00
21000.00

27500.00
27500.00
27500.00

338.55
399.09
471.64

20102.45
21232.68
24794.97

5.61
5.61
6.00

841.50
841.50
900.00

2512.81
2654.09
3099.37

1005.12
1061.63
1239.75

337269598.xlsx -DI & MS pipes

12.50%
120.15

5.00%
48.06

Page 181 of 3205

Sl
No

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96

DI K9 PIPES for 6.00Mts working length

Dia of Pipes

Basic Rate of
Market Rate of SSR Rate of Pig
Pipe per Rmt
Pig Iron / MT
Iron / MT
as per SSR

P1

R2

R1

Weight of
Pipe per 1
Rmt

Actual Rate of
Pipe per Rmt

Transp't
charges
/Rmt/Km

P2

Total
Transport
charges for

CED @

Add ST @

150 Km

12.50%

5.00%

100mm dia

1061.00

21000.00

27500.00

15.83

962.22

0.22

33.00

120.28

48.11

150mm dia

1568.00

21000.00

27500.00

24.00

1418.24

0.33

49.50

177.28

70.91

200mm dia

2093.00

21000.00

27500.00

32.33

1891.26

0.44

66.00

236.41

94.56

250mm dia

2746.00

21000.00

27500.00

42.50

2480.80

0.55

82.50

310.10

124.04

300mm dia

3479.00

21000.00

27500.00

53.83

3143.10

0.66

99.00

392.89

157.16

350mm dia

4336.00

21000.00

27500.00

67.17

3916.86

0.88

132.00

489.61

195.84

400mm dia

5228.00

21000.00

27500.00

80.33

4726.74

0.99

148.50

590.84

236.34

450mm dia

6256.00

21000.00

27500.00

95.83

5658.02

1.21

181.50

707.25

282.90

500mm dia

7278.00

21000.00

27500.00

111.50

6582.24

1.43

214.50

822.78

329.11

10

600mm dia

9598.00

21000.00

27500.00

147.00

8680.72

1.87

280.50

1085.09

434.04

11

700mm dia

12408.00

21000.00

27500.00

187.17

11240.06

2.75

412.50

1405.01

562.00

11

750mm dia

13925.00

21000.00

27500.00

210.00

12614.60

3.30

495.00

1576.83

630.73

13

800mm dia

15365.00

21000.00

27500.00

232.33

13915.26

5.61

841.50

1739.41

695.76

14

900mm dia

18741.00

21000.00

27500.00

281.83

16982.38

5.61

841.50

2122.80

849.12

1000mm dia
22215.00
21000.00
27500.00
1100mm dia
23723.00
21000.00
27500.00
1200mm dia
27738.00
21000.00
27500.00
1) Weights of DI pipes based on Table.8 of IS 8329/1994

336.17
365.83
432.33

20117.30
21440.22
25040.26

5.61
5.61
6.00

841.50
841.50
900.00

2514.66
2680.03
3130.03

15
16
17

337269598.xlsx -DI & MS pipes

1005.87
1072.01
1252.01

Page 182 of 3205

RUBBER GASKETS
E

Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubber gaskets
suitable for C.I/ D.I. S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with companys standard
packing, transportation, unloading & stacking, central excise duty but excluding VAT etc., complete.
Rates vide Table,25, Pg.115 of PH items

Dia in mm

Basic Rate

Nov-15

CED @

Add ST @

OH & CP@

12.50%

5.00%

13.615%

Sub-total

Add VAT @

Total Rs.

0%

80mm dia

69.00

8.63

3.45

9.39

90.47

0.00

90.47

100mm dia

108.00

13.50

5.40

14.70

141.60

0.00

141.60

125mm dia

129.00

16.13

6.45

17.56

169.14

0.00

169.14

150mm dia

157.00

19.63

7.85

21.38

205.86

0.00

205.86

200mm dia

191.00

23.88

9.55

26.00

250.43

0.00

250.43

250mm dia

213.00

26.63

10.65

29.00

279.28

0.00

279.28

300mm dia

325.00

40.63

16.25

44.25

426.13

0.00

426.13

350mm dia

411.00

51.38

20.55

55.96

538.89

0.00

538.89

400mm dia

449.00

56.13

22.45

61.13

588.71

0.00

588.71

10

450mm dia

483.00

60.38

24.15

65.76

633.29

0.00

633.29

11

500mm dia

670.00

83.75

33.50

91.22

878.47

0.00

878.47

12

600mm dia

794.00

99.25

39.70

108.10

1041.05

0.00

1041.05

13

700mm dia

1055.00

131.88

52.75

143.64

1383.27

0.00

1383.27

14

750mm dia

1172.00

146.50

58.60

159.57

1536.67

0.00

1536.67

15

800mm dia

1405.00

175.63

70.25

191.29

1842.17

0.00

1842.17

16

900mm dia

1695.00

211.88

84.75

230.77

2222.40

0.00

2222.40

17

1000mm dia

1855.00

231.88

92.75

252.56

2432.19

0.00

2432.19

337269598.xlsx -DI & MS pipes

Page 183 of 3205

DATA FOR MS PIPES

Manufacture, Supply and Delivery of Spirally welded M.S Pipes Conforming to IS 3589/2001 including in lining with Cement motor (1:2)12mm thick using 4 numbers of 6mm di
cement motor (1:3) 30mm thick by shorcreting or Guniting duly providing wire mesh of size 50x50x3mm including cost of all materials, Labour charges, Transportation to anywhere
the SSR)

Based on CSSR 2015-16

for the month of

MS PIPES

Sl
No

Dia of Pipes

Nov-15

R1 = (M2 - M1 ) / 1000 x Wm

Thick ness of
pipe

Basic Rate of
Pipe

Weight of Pipe
Market Rate of SSR Rate of
Actual Rate of
req. per 1 Rmt
MS plate / MT MS plate / MT
Pipe per Rmt

CED @

ST @

Add over
heads

500 mm dia

8 mm

P1
8559.0

M2

M1

Wm

R1

12.50%

5.00%

13.615%

37000.0

46000.0

100.24

7692.93

961.62

384.65

1047.39

600 mm dia

8 mm

10207.0

37000.0

46000.0

119.97

9170.46

1146.31

458.52

1248.56

700 mm dia

8 mm

11907.0

37000.0

46000.0

139.70

10699.99

1337.50

535.00

1456.80

700 mm dia

10 mm

14763.0

37000.0

46000.0

175.12

13249.96

1656.25

662.50

1803.98

800 mm dia

8 mm

13665.0

37000.0

46000.0

159.43

12287.52

1535.94

614.38

1672.95

800 mm dia

10 mm

15758.0

37000.0

46000.0

199.78

14031.90

1753.99

701.60

1910.44

800 mm dia

12 mm

18643.0

37000.0

46000.0

240.33

16566.55

2070.82

828.33

2255.54

900 mm dia

8 mm

15255.0

37000.0

46000.0

179.16

13707.06

1713.38

685.35

1866.22

900 mm dia

10 mm

17606.0

37000.0

46000.0

224.45

15666.75

1958.34

783.34

2133.03

10

900 mm dia

12 mm

19963.0

37000.0

46000.0

269.93

17630.80

2203.85

881.54

2400.43

11

1000 mm dia

8 mm

17124.0

37000.0

46000.0

198.90

15405.50

1925.69

770.28

2097.46

12

1000 mm dia

10 mm

19726.0

37000.0

46000.0

249.11

17573.69

2196.71

878.68

2392.66

13

1000 mm dia

12 mm

22244.0

37000.0

46000.0

299.53

19656.06

2457.01

982.80

2676.17

14

1000 mm dia

14 mm

25680.0

37000.0

46000.0

350.14

22654.79

2831.85

1132.74

3084.45

337269598.xlsx -DI & MS pipes

Page 184 of 3205

Sl
No

Dia of Pipes

Thick ness of
pipe

Basic Rate of
Pipe

Weight of Pipe
Market Rate of SSR Rate of
Actual Rate of
req. per 1 Rmt
MS plate / MT MS plate / MT
Pipe per Rmt

CED @

ST @

Add over
heads

15

1100 mm dia

8 mm

P1
20195.0

M2

M1

Wm

R1

12.50%

5.00%

13.615%

37000.0

46000.0

218.63

18306.04

2288.26

915.30

2492.37

16

1100 mm dia

10 mm

23058.0

37000.0

46000.0

273.78

20692.54

2586.57

1034.63

2817.29

17

1100 mm dia

12 mm

25923.0

37000.0

46000.0

329.13

23079.32

2884.92

1153.97

3142.25

18

1100 mm dia

14 mm

29941.0

37000.0

46000.0

384.67

26617.45

3327.18

1330.87

3623.97

19

1100 mm dia

16 mm

33974.0

37000.0

46000.0

440.41

30168.86

3771.11

1508.44

4107.49

20

1200 mm dia

8 mm

22831.0

37000.0

46000.0

238.36

20771.57

2596.45

1038.58

2828.05

21

1200 mm dia

10 mm

25944.0

37000.0

46000.0

298.44

23365.48

2920.69

1168.27

3181.21

22

1200 mm dia

12 mm

29066.0

37000.0

46000.0

358.72

25966.66

3245.83

1298.33

3535.36

23

1200 mm dia

14 mm

32205.0

37000.0

46000.0

419.20

28583.11

3572.89

1429.16

3891.59

24

1200 mm dia

16 mm

36532.0

37000.0

46000.0

479.88

32385.84

4048.23

1619.29

4409.33

25

1200 mm dia

18 mm

40872.0

37000.0

46000.0

540.75

36199.92

4524.99

1810.00

4928.62

26

1300 mm dia

8 mm

24917.0

37000.0

46000.0

258.09

22687.10

2835.89

1134.36

3088.85

27

1300 mm dia

10 mm

28285.0

37000.0

46000.0

323.11

25493.33

3186.67

1274.67

3470.92

28

1300 mm dia

12 mm

31664.0

37000.0

46000.0

388.32

28308.92

3538.62

1415.45

3854.26

29

1300 mm dia

14 mm

35052.0

37000.0

46000.0

453.73

31131.77

3891.47

1556.59

4238.59

30

1300 mm dia

16 mm

38455.0

37000.0

46000.0

519.34

33967.90

4245.99

1698.40

4624.73

31

1300 mm dia

18 mm

43012.0

37000.0

46000.0

585.15

37956.30

4744.54

1897.82

5167.75

32

1300 mm dia

20 mm

47583.0

37000.0

46000.0

651.15

41957.06

5244.63

2097.85

5712.45

33

1400 mm dia

8 mm

26509.0

37000.0

46000.0

277.82

24108.64

3013.58

1205.43

3282.39

34

1400 mm dia

10 mm

30130.0

37000.0

46000.0

347.77

27125.27

3390.66

1356.26

3693.11

337269598.xlsx -DI & MS pipes

Page 185 of 3205

Sl
No

Dia of Pipes

Thick ness of
pipe

Basic Rate of
Pipe

Weight of Pipe
Market Rate of SSR Rate of
Actual Rate of
req. per 1 Rmt
MS plate / MT MS plate / MT
Pipe per Rmt

CED @

ST @

Add over
heads

35

1400 mm dia

12 mm

P1
33764.0

M2

M1

Wm

R1

12.50%

5.00%

13.615%

37000.0

46000.0

417.92

30153.17

3769.15

1507.66

4105.35

36

1400 mm dia

14 mm

37412.0

37000.0

46000.0

488.26

33193.43

4149.18

1659.67

4519.29

37

1400 mm dia

16 mm

41066.0

37000.0

46000.0

558.80

36237.97

4529.75

1811.90

4933.80

38

1400 mm dia

18 mm

45926.0

37000.0

46000.0

629.54

40486.77

5060.85

2024.34

5512.27

39

1400 mm dia

20 mm

50797.0

37000.0

46000.0

700.48

44744.85

5593.11

2237.24

6092.01

40

1400 mm dia

22 mm

55682.0

37000.0

46000.0

771.61

49015.29

6126.91

2450.76

6673.43

41

1500 mm dia

8 mm

28374.0

37000.0

46000.0

297.55

25803.17

3225.40

1290.16

3513.10

42

1500 mm dia

10 mm

32256.0

37000.0

46000.0

372.44

29038.12

3629.77

1451.91

3953.54

43

1500 mm dia

12 mm

36142.0

37000.0

46000.0

447.52

32275.43

4034.43

1613.77

4394.30

44

1500 mm dia

14 mm

40043.0

37000.0

46000.0

522.79

35526.09

4440.76

1776.30

4836.88

45

1500 mm dia

16 mm

43955.0

37000.0

46000.0

598.27

38785.95

4848.24

1939.30

5280.71

46

1500 mm dia

18 mm

47871.0

37000.0

46000.0

673.94

42048.16

5256.02

2102.41

5724.86

47

1500 mm dia

20 mm

52935.0

37000.0

46000.0

749.81

46456.64

5807.08

2322.83

6325.07

48

1500 mm dia

22 mm

58013.0

37000.0

46000.0

825.87

50877.48

6359.69

2543.87

6926.97

49

1500 mm dia

24 mm

63105.0

37000.0

46000.0

902.14

55310.51

6913.81

2765.53

7530.53

50

1600 mm dia

8 mm

29981.0

37000.0

46000.0

317.29

27239.61

3404.95

1361.98

3708.67

51

1600 mm dia

10 mm

34097.0

37000.0

46000.0

397.10

30666.06

3833.26

1533.30

4175.18

52

1600 mm dia

12 mm

38242.0

37000.0

46000.0

477.11

34119.77

4264.97

1705.99

4645.41

53

1600 mm dia

14 mm

42398.0

37000.0

46000.0

557.32

37582.76

4697.85

1879.14

5116.89

54

1600 mm dia

16 mm

46564.0

37000.0

46000.0

637.73

41054.01

5131.75

2052.70

5589.50

337269598.xlsx -DI & MS pipes

Page 186 of 3205

Sl
No

Dia of Pipes

Thick ness of
pipe

Basic Rate of
Pipe

Weight of Pipe
Market Rate of SSR Rate of
Actual Rate of
req. per 1 Rmt
MS plate / MT MS plate / MT
Pipe per Rmt

CED @

ST @

Add over
heads

55

1600 mm dia

18 mm

P1
50739.0

M2

M1

Wm

R1

12.50%

5.00%

13.615%

37000.0

46000.0

718.33

44532.63

5566.58

2226.63

6063.12

56

1600 mm dia

20 mm

56099.0

37000.0

46000.0

799.14

49194.43

6149.30

2459.72

6697.82

57

1600 mm dia

22 mm

61474.0

37000.0

46000.0

880.14

53869.59

6733.70

2693.48

7334.34

58

1600 mm dia

24 mm

66861.0

37000.0

46000.0

961.33

58555.11

7319.39

2927.76

7972.28

59

1600 mm dia

26 mm

72260.0

37000.0

46000.0

1042.72

63250.90

7906.36

3162.55

8611.61

337269598.xlsx -DI & MS pipes

Page 187 of 3205

R DUCTILE IRON PRESSURE PIPES

cket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7
ipes with out side Zinc coating. Rates are including Transportation, CED and ST etc,. complete.

Add over
heads on pipe
& Transport

Sub-total

13.615%

Add VAT & LC


Rate per 1Rmt
@
including CP &
OH
0%

114.53

1097.16

0.00

1097.16

157.93

1512.20

0.00

1512.20

219.12

2101.47

0.00

2101.47

294.20

2821.63

0.00

2821.63

380.56

3647.50

0.00

3647.50

478.13

4584.27

0.00

4584.27

579.78

5560.29

0.00

5560.29

699.66

6708.96

0.00

6708.96

835.29

8009.36

0.00

8009.36

1114.43

10683.07

0.00

10683.07

1450.88

13900.08

0.00

13900.08

1631.14

15621.58

0.00

15621.58

1840.81

17580.05

0.00

17580.05

2221.81

21249.17

0.00

21249.17

2610.44

24991.77

0.00

24991.77

337269598.xlsx -DI & MS pipes

Page 188 of 3205

Add over
heads on pipe
& Transport

Sub-total

13.615%

Add VAT @

Rate per 1Rmt


including CP &
OH

0%

114.61

1097.98

0.00

1097.98

158.05

1513.35

0.00

1513.35

219.25

2102.71

0.00

2102.71

294.34

2823.03

0.00

2823.03

380.78

3649.62

0.00

3649.62

478.39

4586.80

0.00

4586.80

580.23

5564.63

0.00

5564.63

700.21

6714.29

0.00

6714.29

835.79

8014.19

0.00

8014.19

1115.27

10691.17

0.00

10691.17

1451.88

13909.66

0.00

13909.66

1632.20

15631.73

0.00

15631.73

1842.12

17592.73

0.00

17592.73

2223.41

21264.55

0.00

21264.55

2612.46

25011.24

0.00

25011.24

337269598.xlsx -DI & MS pipes

Page 189 of 3205

TA FOR DI K9 PIPES

cket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K9
ipes with out side Zinc coating. Rates are including Transportationand CED and ST etc,. complete.

Add over
heads on pipe
& Transport

Sub-total

Add VAT @

Rate per 1Rmt


including CP &
OH

13.615%
135.35

0%
1297.72

0.00

1297.72

199.68

1914.30

0.00

1914.30

266.29

2552.91

0.00

2552.91

348.80

3344.55

0.00

3344.55

441.12

4230.70

0.00

4230.70

551.01

5283.27

0.00

5283.27

663.27

6361.44

0.00

6361.44

794.60

7620.39

0.00

7620.39

924.95

8869.92

0.00

8869.92

1219.37

11693.70

0.00

11693.70

1585.48

15196.32

0.00

15196.32

1783.64

17090.16

0.00

17090.16

2007.87

19188.87

0.00

19188.87

2425.03

23206.24

0.00

23206.24

2851.52
3005.40
3498.37

27313.40
28795.29
33532.46

0.00
0.00
0.00

27313.40
28795.29
33532.46

337269598.xlsx -DI & MS pipes

Page 190 of 3205

Add over
heads on pipe
& Transport

Sub-total

13.615%

Add VAT @

Rate per 1Rmt


including CP &
OH

0%

135.50

1299.11

0.00

1299.11

199.83

1915.76

0.00

1915.76

266.48

2554.71

0.00

2554.71

348.99

3346.43

0.00

3346.43

441.41

4233.56

0.00

4233.56

551.25

5285.56

0.00

5285.56

663.76

6366.19

0.00

6366.19

795.05

7624.72

0.00

7624.72

925.38

8874.01

0.00

8874.01

1220.07

11700.42

0.00

11700.42

1586.50

15206.06

0.00

15206.06

1784.87

17102.03

0.00

17102.03

2009.13

19201.06

0.00

19201.06

2426.72

23222.52

0.00

23222.52

2853.54
3033.66
3531.77

27332.87
29067.41
33854.07

0.00
0.00
0.00

27332.87
29067.41
33854.07

337269598.xlsx -DI & MS pipes

Page 191 of 3205

337269598.xlsx -DI & MS pipes

Page 192 of 3205

TA FOR MS PIPES

n lining with Cement motor (1:2)12mm thick using 4 numbers of 6mm dia M.S. Rings at each end of the pipe and Out coating
ncluding cost of all materials, Labour charges, Transportation to anywhere in AP, and including taxes & duties, etc..( Table.14, of

7.85

Sub-total

Add VAT, LC Rate per 1Rmt- Rate per 1Rmt


etc
Exl Over
including over
heads and VAT heads & VAT
0.00%

10086.59

0.00

9039.20

10086.59

12023.85

0.00

10775.29

12023.85

14029.29

0.00

12572.49

14029.29

17372.69

0.00

15568.71

17372.69

16110.79

0.00

14437.84

16110.79

18397.93

0.00

16487.49

18397.93

21721.24

0.00

19465.70

21721.24

17972.01

0.00

16105.79

17972.01

20541.46

0.00

18408.43

20541.46

23116.62

0.00

20716.19

23116.62

20198.93

0.00

18101.47

20198.93

23041.74

0.00

20649.08

23041.74

25772.04

0.00

23095.87

25772.04

29703.83

0.00

26619.38

29703.83

337269598.xlsx -DI & MS pipes

Page 193 of 3205

Sub-total

Add VAT, LC Rate per 1Rmt- Rate per 1Rmt


etc
Exl Over
including over
heads and VAT heads & VAT
0.00%

24001.97

0.00

21509.60

24001.97

27131.03

0.00

24313.74

27131.03

30260.46

0.00

27118.21

30260.46

34899.47

0.00

31275.50

34899.47

39555.90

0.00

35448.41

39555.90

27234.65

0.00

24406.60

27234.65

30635.65

0.00

27454.44

30635.65

34046.18

0.00

30510.82

34046.18

37476.75

0.00

33585.16

37476.75

42462.69

0.00

38053.36

42462.69

47463.53

0.00

42534.91

47463.53

29746.20

0.00

26657.35

29746.20

33425.59

0.00

29954.67

33425.59

37117.25

0.00

33262.99

37117.25

40818.42

0.00

36579.83

40818.42

44537.02

0.00

39912.29

44537.02

49766.41

0.00

44598.66

49766.41

55011.99

0.00

49299.54

55011.99

31610.04

0.00

28327.65

31610.04

35565.30

0.00

31872.19

35565.30

337269598.xlsx -DI & MS pipes

Page 194 of 3205

Sub-total

Add VAT, LC Rate per 1Rmt- Rate per 1Rmt


etc
Exl Over
including over
heads and VAT heads & VAT
0.00%

39535.33

0.00

35429.98

39535.33

43521.57

0.00

39002.28

43521.57

47513.42

0.00

42579.62

47513.42

53084.23

0.00

47571.96

53084.23

58667.21

0.00

52575.20

58667.21

64266.39

0.00

57592.96

64266.39

33831.83

0.00

30318.73

33831.83

38073.34

0.00

34119.80

38073.34

42317.93

0.00

37923.63

42317.93

46580.03

0.00

41743.15

46580.03

50854.20

0.00

45573.49

50854.20

55131.45

0.00

49406.59

55131.45

60911.62

0.00

54586.55

60911.62

66708.01

0.00

59781.04

66708.01

72520.38

0.00

64989.85

72520.38

35715.21

0.00

32006.54

35715.21

40207.80

0.00

36032.62

40207.80

44736.14

0.00

40090.73

44736.14

49276.64

0.00

44159.75

49276.64

53827.96

0.00

48238.46

53827.96

337269598.xlsx -DI & MS pipes

Page 195 of 3205

Sub-total

Add VAT, LC Rate per 1Rmt- Rate per 1Rmt


etc
Exl Over
including over
heads and VAT heads & VAT
0.00%

58388.96

0.00

52325.84

58388.96

64501.27

0.00

57803.45

64501.27

70631.11

0.00

63296.77

70631.11

76774.54

0.00

68802.26

76774.54

82931.42

0.00

74319.81

82931.42

337269598.xlsx -DI & MS pipes

Page 196 of 3205

RATES OF HDPE PIPES 6Kg/Sqcm -PE -100 Grade

Manufacture, supply, & delivery of HDPE pipes conforming to IS 4984 - 1995 including transportation to any where in A.P,including excise duty, sale tax but excluding spec
90 mm dia straight length in 6 M.)
Table 16(I)

Pg.49

pipe OD in
pipe OD in mm
Mts
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
710 mm
800 mm

0.063
0.075
0.090
0.110
0.125
0.140
0.160
0.180
0.200
0.225
0.250
0.280
0.315
0.355
0.400
0.450
0.500
0.560
0.630
0.710
0.800

of SoR

Min thick
in mm
2.900
3.500
4.100
5.000
5.700
6.400
7.300
8.200
9.100
10.300
11.400
12.800
14.400
16.200
18.200
20.500
22.800
25.500
28.700
32.300
36.400

2014-15

11/1/2015

Max thick Av.thick in pipe ID in


in mm
mm
Mts
3.400
4.100
4.800
5.700
6.500
7.300
8.300
9.300
10.300
11.600
12.800
14.300
16.100
18.100
21.200
23.800
26.500
29.600
33.300
37.400
42.100

3.15
3.80
4.45
5.35
6.10
6.85
7.80
8.75
9.70
10.95
12.10
13.55
15.25
17.15
19.70
22.15
24.65
27.55
31.00
34.85
39.25

0.06
0.07
0.08
0.10
0.11
0.13
0.14
0.16
0.18
0.20
0.23
0.25
0.28
0.32
0.36
0.41
0.45
0.50
0.57
0.64
0.72

Wt of pipe

SSR Rate

SSR resin
rate

new resin rate

pipe rate

Over heads

Excise
duty

P1

A1

A2

P2

13.615%

12.50%

119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750

119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750
119750

101.00
143.00
203.00
305.00
389.00
489.00
639.00
805.00
995.00
1284.00
1580.00
1980.00
2510.00
3151.00
4147.00
5154.00
6375.00
7422.00
9359.00
11903.00
15106.00

0.56
0.80
1.13
1.66
2.15
2.70
3.52
4.44
5.47
6.95
8.53
10.70
13.55
17.17
22.21
28.09
34.73
43.48
55.04
69.74
88.50

101.0
143.0
203.0
305.0
389.0
489.0
639.0
805.0
995.0
1284.0
1580.0
1980.0
2510.0
3151.0
4147.0
5154.0
6375.0
7422.0
9359.0
11903.0
15106.0

337269598.xlsx - data-HDPE & PVC pipes

13.75
19.47
27.64
41.53
52.96
66.58
87.00
109.60
135.47
174.82
215.12
269.58
341.74
429.01
564.61
701.72
867.96
1010.51
1274.23
1620.59
2056.68

12.63
17.88
25.38
38.13
48.63
61.13
79.88
100.63
124.38
160.50
197.50
247.50
313.75
393.88
518.38
644.25
796.88
927.75
1169.88
1487.88
1888.25

Page 197 of 3205

900 mm
1000 mm

0.900
1.000

41.000
45.500

47.400
52.600

44.20
49.05

0.81
0.90

* Density is taken as 943.45kg/cumt as per IS 4984 1995


* Resin rate exlussive of CED for the month of

112.11
138.25

19136.0
23598.0

PARA 5.2.1
42309.00

337269598.xlsx - data-HDPE & PVC pipes

119750
119750

119750
119750

19136.00
23598.00

2605.37
3212.87

2392.00
2949.75

Page 198 of 3205

E PIPES 6Kg/Sqcm -PE -100 Grade

ere in A.P,including excise duty, sale tax but excluding specials etc., complete. ( Supply upto 90 mm dia in coil & above
raight length in 6 M.)

ST @
Sub-total
5.00%
5.05
7.15
10.15
15.25
19.45
24.45
31.95
40.25
49.75
64.20
79.00
99.00
125.50
157.55
207.35
257.70
318.75
371.10
467.95
595.15
755.30

VAT & LC
Total without Total with
@
over heads over heads
0%

132.43
187.50
266.17
399.91
510.04
641.16
837.83
1055.48
1304.60
1683.52
2071.62
2596.08
3290.99
4131.44
5437.34
6757.67
8358.59
9731.36
12271.06
15606.62
19806.23

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

118.68
168.03
238.53
358.38
457.08
574.58
750.83
945.88
1169.13
1508.70
1856.50
2326.50
2949.25
3702.43
4872.73
6055.95
7490.63
8720.85
10996.83
13986.03
17749.55

337269598.xlsx - data-HDPE & PVC pipes

132.43
187.50
266.17
399.91
510.04
641.16
837.83
1055.48
1304.60
1683.52
2071.62
2596.08
3290.99
4131.44
5437.34
6757.67
8358.59
9731.36
12271.06
15606.62
19806.23

Page 199 of 3205

956.80
1179.90

25090.17
30940.52

0.00
0.00

22484.80
27727.65

337269598.xlsx - data-HDPE & PVC pipes

25090.17
30940.52

Page 200 of 3205

17 ( I ). S.S. RATES FOR H.D.P.E FITTINGS FOR THE YEAR 2015-16


Manufacture, supply, & delivery of HDPE fittings conforming to IS 4984 - 1995 including transportation to any where in A.P, Central excise duty,

PIPE ENDS LONG NECK


Description
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm

Unit
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

Basic Rate
79.00
100.0
120.0
155.0
215.0
386.0
390.0
544.0
771.0
991.0
1137.0
1332.0
1488.0
1716.0
3587.0
4781.0
7955.0
8853.0

ECD

ST

Over Heads

12.50%

5.00%

13.615%

9.88
12.50
15.00
19.38
26.88
48.25
48.75
68.00
96.38
123.88
142.13
166.50
186.00
214.50
448.38
597.63
994.38
1106.63

3.95
5.00
6.00
7.75
10.75
19.30
19.50
27.20
38.55
49.55
56.85
66.60
74.40
85.80
179.35
239.05
397.75
442.65

10.76
13.62
16.34
21.10
29.27
52.55
53.10
74.07
104.97
134.92
154.80
181.35
202.59
233.63
488.37
650.93
1083.07
1205.34

MS FL
Sub-total

VAT & LC.


@
0%

103.6
131.1
157.3
203.2
281.9
506.1
511.4
713.3
1010.9
1299.4
1490.8
1746.5
1951.0
2249.9
4703.1
6268.6
10430.2
11607.6

Total with
over heads

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

337269598.xlsx - data-HDPE & PVC pipes

Description

103.59 50 mm
131.12 63 mm
157.34 75 mm
203.23 90 mm
281.90 110 mm
506.10 125 mm
511.35 140 mm
713.27 160 mm
1010.90 180 mm
1299.35 200 mm
1490.78 225 mm
1746.45 250 mm
1950.99 280 mm
2249.93 315 mm
4703.10 355 mm
6268.61 400 mm
10430.20 450 mm
11607.62 500 mm

Unit

Basic Rate

ECD
12.50%

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

108.00
136.00
172.00
185.00
195.00
268.00
290.00
381.00
537.00
696.00
871.00
1028.00
1166.00
1371.00
2322.00
2880.00
3760.00
4305.00

13.50
17.00
21.50
23.13
24.38
33.50
36.25
47.63
67.13
87.00
108.88
128.50
145.75
171.38
290.25
360.00
470.00
538.13

Page 201 of 3205

END CAPS
Description
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm

Unit
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

Basic Rate
53.0
65.0
80.0
107.0
122.0
169.0
197.0
301.0
489.0
534.0
556.0
792.0
811.0
1108.0
1710.0
2987.0
4804.0
8853.0

REDU

ECD

ST

Over Heads

12.50%

5.00%

13.615%

6.63
8.13
10.00
13.38
15.25
21.13
24.63
37.63
61.13
66.75
69.50
99.00
101.38
138.50
213.75
373.38
600.50
1106.63

2.65
3.25
4.00
5.35
6.10
8.45
9.85
15.05
24.45
26.70
27.80
39.60
40.55
55.40
85.50
149.35
240.20
442.65

7.22
8.85
10.89
14.57
16.61
23.01
26.82
40.98
66.58
72.70
75.70
107.83
110.42
150.85
232.82
406.68
654.06
1205.34

Sub-total

VAT & LC.


@
0%

69.5
85.2
104.9
140.3
160.0
221.6
258.3
394.7
641.2
700.2
729.0
1038.4
1063.4
1452.8
2242.1
3916.4
6298.8
11607.6

Total with
over heads

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

337269598.xlsx - data-HDPE & PVC pipes

Description

69.50 50 x 63mm
85.23 63 x 75 mm
104.89 75 x90 mm
140.30 90 x110mm
159.96 110x125mm
221.59 125x140mm
258.30 140x160mm
394.66 160x180mm
641.16 180x200mm
700.15 200x225mm
729.00 225x250mm
1038.43 250x280mm
1063.35 280x315mm
1452.75 315x355mm
2242.07 355x400mm
3916.41 400x450mm
6298.76 450x500mm
11607.62

Unit

Basic Rate

ECD
12.50%

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

74.00
107.00
175.00
242.00
369.00
510.00
712.00
986.00
1274.00
1564.00
2131.00
3028.00
4281.00
4910.00
6928.00
7187.00
9215.0

9.25
13.38
21.88
30.25
46.13
63.75
89.00
123.25
159.25
195.50
266.38
378.50
535.13
613.75
866.00
898.38
1151.88

Page 202 of 3205

EQUAL TEEs
Description
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm

Unit
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

Basic Rate
102.0
163.0
197.0
346.0
410.0
617.0
850.0
1464.0
1985.0
2734.0
3882.0
5314.0
7441.0
10606.0
15123.0
22152.0
31465.0
43214.0

BE

ECD

ST

Over Heads

12.50%

5.00%

13.615%

12.75
20.38
24.63
43.25
51.25
77.13
106.25
183.00
248.13
341.75
485.25
664.25
930.13
1325.75
1890.38
2769.00
3933.13
5401.75

5.10
8.15
9.85
17.30
20.50
30.85
42.50
73.20
99.25
136.70
194.10
265.70
372.05
530.30
756.15
1107.60
1573.25
2160.70

13.89
22.19
26.82
47.11
55.82
84.00
115.73
199.32
270.26
372.23
528.53
723.50
1013.09
1444.01
2059.00
3015.99
4283.96
5883.59

Sub-total

VAT & LC.


@
0%

133.7
213.7
258.3
453.7
537.6
809.0
1114.5
1919.5
2602.6
3584.7
5089.9
6967.5
9756.3
13906.1
19828.5
29044.6
41255.3
56660.0

Total with
over heads

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

337269598.xlsx - data-HDPE & PVC pipes

Description

133.74 50 mm
213.72 63 mm
258.30 75 mm
453.66 90 mm
537.57 110 mm
808.98 125 mm
1114.48 140 mm
1919.52 160 mm
2602.64 180 mm
3584.68 200 mm
5089.88 225 mm
6967.45 250 mm
9756.27 280 mm
13906.06 315 mm
19828.53 355 mm
29044.59 400 mm
41255.34 450 mm
56660.04 500 mm

Unit

Basic Rate

ECD
12.50%

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

65.0
143.0
186.0
319.0
420.0
620.0
817.0
1218.0
1748.0
2368.0
3359.0
4604.0
6638.0
9181.0
12727.0
19197.0
28222.0
38261.0

8.13
17.88
23.25
39.88
52.50
77.50
102.13
152.25
218.50
296.00
419.88
575.50
829.75
1147.63
1590.88
2399.63
3527.75
4782.63

Page 203 of 3205

Providing and fixing Electro fusion Ferrule Tapping Saddle confirming to prEN 12201-3, Manufactured from virgin resin of PE-80/PE-100 having blue/black colour using food grade
from quality agencies like DVGMK/KIWA/SPGN/WRc etc. for usage in drinking water system and having working pressure of 10 Bar. The cost shall include testing of all materi
charges, transportation upto site, transit insurance, loading, unloading, stacking, providing and fixing etc. complete as specified and

(Main pipe outer diameter in mm & Tapping size in Inches)


ECD
Description

Unit
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

Over Heads

Basic Rate

Sub-total
12.50%

63x1/2
63 x3/4
63 x1
63 x1/2
75 x1/2
75 x3/4
75 x1
90 x1/2
90 x3/4
90 x1
90 x 1 1/4
90 x 1 1/2
90 x2
110x1/2
110 x3/4
110 x1
110 x 1 1/4
110x1 1/2
110x2
160 x1/2
160 x3/4

ST

921.00
921.00
921.00
921.00
921.00
921.00
921.00
921.00
921.00
921.00
1195.00
1195.00
1195.00
921.00
921.00
921.00
1195.00
1195.00
1195.00
921.00
921.00

115.13
115.13
115.13
115.13
115.13
115.13
115.13
115.13
115.13
115.13
149.38
149.38
149.38
115.13
115.13
115.13
149.38
149.38
149.38
115.13
115.13

5.00%
46.05
46.05
46.05
46.05
46.05
46.05
46.05
46.05
46.05
46.05
59.75
59.75
59.75
46.05
46.05
46.05
59.75
59.75
59.75
46.05
46.05

13.615%
125.39
125.39
125.39
125.39
125.39
125.39
125.39
125.39
125.39
125.39
162.70
162.70
162.70
125.39
125.39
125.39
162.70
162.70
162.70
125.39
125.39

(Main pipe outer diameter in


VAT & LC.
@
0%

1207.6
1207.6
1207.6
1207.6
1207.6
1207.6
1207.6
1207.6
1207.6
1207.6
1566.8
1566.8
1566.8
1207.6
1207.6
1207.6
1566.8
1566.8
1566.83
1207.57
1207.57

Total with
over heads

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

337269598.xlsx - data-HDPE & PVC pipes

ECD
Description

1207.57 160 x1
1207.57 160 x 1 1/4
1207.57 160 x 1 1/2
1207.57 160 x 2
1207.57 200 x 1/2
1207.57 200 x 3/4
1207.57 200 x 1
1207.57 200 x 1 1/4
1207.57 200 x 2
1207.57 250 x 1/2
1566.83 250 x3/4
1566.83 250 x1
1566.83 250 x 1 1/4
1207.57 250 x1 1/2
1207.57 250 x 2
1207.57 315 x 1/2
1566.83 315 x3/4
1566.83 315x1
1566.83 315x1 1/4
1207.57 315x1 1/2
1207.57 315x2

Unit

Basic Rate
12.50%

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

921.00
1306.00
1306.00
1306.00
1300.00
1300.00
1300.00
1880.00
1880.00
1300.00
1300.00
1300.00
1880.00
1880.00
1880.00
1549.00
1549.00
1549.00
2102.00
2102.00
2102.00

115.13
163.25
163.25
163.25
162.50
162.50
162.50
235.00
235.00
162.50
162.50
162.50
235.00
235.00
235.00
193.63
193.63
193.63
262.75
262.75
262.75

Page 204 of 3205

P.E FITTINGS FOR THE YEAR 2015-16

ncluding transportation to any where in A.P, Central excise duty, sale tax etc., complete

MS FLANGES
ST

Over Heads

5.00%

13.615%

5.40
6.80
8.60
9.25
9.75
13.40
14.50
19.05
26.85
34.80
43.55
51.40
58.30
68.55
116.10
144.00
188.00
215.25

14.70
18.52
23.42
25.19
26.55
36.49
39.48
51.87
73.11
94.76
118.59
139.96
158.75
186.66
316.14
392.11
511.92
586.13

Sub-total

VAT & LC. @


0%

141.6
178.3
225.5
242.6
255.7
351.4
380.2
499.6
704.1
912.6
1142.0
1347.9
1528.8
1797.6
3044.5
3776.1
4929.9
5644.5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

337269598.xlsx - data-HDPE & PVC pipes

Total with
over heads
141.60
178.32
225.52
242.57
255.68
351.39
380.23
499.55
704.09
912.56
1142.02
1347.86
1528.80
1797.59
3044.49
3776.11
4929.92
5644.51

Page 205 of 3205

REDUCERS
ST

Over Heads

5.00%

13.615%

3.70
5.35
8.75
12.10
18.45
25.50
35.60
49.30
63.70
78.20
106.55
151.40
214.05
245.50
346.40
359.35
460.75

10.08
14.57
23.83
32.95
50.24
69.44
96.94
134.24
173.46
212.94
290.14
412.26
582.86
668.50
943.25
978.51
1254.62

Sub-total

VAT & LC. @


0%

97.0
140.3
229.5
317.3
483.8
668.7
933.5
1292.8
1670.4
2050.6
2794.1
3970.2
5613.0
6437.8
9083.7
9423.2
12082

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

337269598.xlsx - data-HDPE & PVC pipes

Total with
over heads
97.03
140.30
229.46
317.30
483.82
668.69
933.54
1292.79
1670.41
2050.64
2794.07
3970.16
5613.04
6437.75
9083.65
9423.24
12082.25

Page 206 of 3205

BENDS
ST

Over Heads

5.00%

13.615%

3.25
7.15
9.30
15.95
21.00
31.00
40.85
60.90
87.40
118.40
167.95
230.20
331.90
459.05
636.35
959.85
1411.10
1913.05

8.85
19.47
25.32
43.43
57.18
84.41
111.23
165.83
237.99
322.40
457.33
626.83
903.76
1249.99
1732.78
2613.67
3842.43
5209.24

Sub-total

VAT & LC. @


0%

85
188
244
418
551
813
1071
1597
2292
3105
4404
6037
8703
12038
16687
25170
37003
50166

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

337269598.xlsx - data-HDPE & PVC pipes

Total with
over heads
85.23
187.50
243.87
418.26
550.68
812.91
1071.21
1596.98
2291.89
3104.80
4404.16
6036.53
8703.41
12037.67
16687.01
25170.15
37003.28
50165.92

Page 207 of 3205

esin of PE-80/PE-100 having blue/black colour using food grade compounded raw material with quality assurance certificate
ng pressure of 10 Bar. The cost shall include testing of all materials, labour all taxes (Central, State and Municipal), inspection
ding, stacking, providing and fixing etc. complete as specified and directed

(Main pipe outer diameter in mm & Tapping size in Inches)


ST

Over Heads

VAT & LC. @


Sub-total

5.00%
46.05
65.30
65.30
65.30
65.00
65.00
65.00
94.00
94.00
65.00
65.00
65.00
94.00
94.00
94.00
77.45
77.45
77.45
105.10
105.10
105.10

13.615%
125.39
177.81
177.81
177.81
177.00
177.00
177.00
255.96
255.96
177.00
177.00
177.00
255.96
255.96
255.96
210.90
210.90
210.90
286.19
286.19
286.19

0%
1208
1712
1712
1712
1705
1705
1705
2465
2465
1705
1705
1705
2465
2465
2465
2031
2031
2031
2756
2756
2756

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

337269598.xlsx - data-HDPE & PVC pipes

Total with
over heads
1207.57
1712.36
1712.36
1712.36
1704.50
1704.50
1704.50
2464.96
2464.96
1704.50
1704.50
1704.50
2464.96
2464.96
2464.96
2030.98
2030.98
2030.98
2756.04
2756.04
2756.04

Page 208 of 3205

HDPE
7

Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment and gradiant to hydraulic field te
code including cost of water with minimum water lead of 500m (Labour charges only) Outer dia of pipes in m
Rates vide item 15 , Pg.227 of the SSR
Add ML at
DIA of Pipe in mm

Basic Rate
20%

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

63 mm dia
75 mm dia
90 mm dia
110 mm dia
125 mm dia
140 mm dia
160 mm dia
180 mm dia
200 mm dia
225 mm dia
250 mm dia
280 mm dia
315 mm dia
355 mm dia
400 mm dia
450 mm dia

Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

35.00
39.00
44.00
50.00
61.00
64.00
69.00
76.00
83.00
91.00
97.00
107.00
174.00
194.00
238.00
264.00

337269598.xlsx -data-Lowering

7.00
7.80
8.80
10.00
12.20
12.80
13.80
15.20
16.60
18.20
19.40
21.40
34.80
38.80
47.60
52.80

Add CP @
13.615%
5.88
6.55
7.39
8.40
10.25
10.75
11.59
12.77
13.94
15.29
16.30
17.98
29.23
32.59
39.98
44.35

Page 209 of 3205

HDPE

E Pipe line laid to true alignment and gradiant to hydraulic field test pressure per IS
water lead of 500m (Labour charges only) Outer dia of pipes in mm.

Sub - Total
47.88
53.35
60.19
68.40
83.45
87.55
94.39
103.97
113.54
124.49
132.70
146.38
238.03
265.39
325.58
361.15

Total
53.76
59.90
67.58
76.80
93.70
98.30
105.98
116.74
127.48
139.78
149.00
164.36
267.26
297.98
365.56
405.50

337269598.xlsx -data-Lowering

Page 210 of 3205

LOWERING DI S/S
1

PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into t
them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from
(Ref to specifications. BIS No.3114/1994)
Rates as per PH data
DIA of Pipe in mm

a
b
c
d
e
f
g
h
i
j
l
m
n
p
q

100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

Unit
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre

Rate as per
WS.data
27.09
44.12
64.14
86.66
112.09
140.59
171.58
207.56
241.96
323.06
416.78
467.22
521.64
634.15
764.77

337269598.xlsx -data-Lowering

Page 211 of 3205

LOWERING DI S/S

(all classes) and specials (fittings) with s/s ends carefully into trenches and laying
ing all sundries but excluding cost and conveyance of pipes from source of supply

Sub- Total

27.09
44.12
64.14
86.66
112.09
140.59
171.58
207.56
241.96
323.06
416.78
467.22
521.64
634.15
764.77

Total
27.09
44.12
64.14
86.66
112.09
140.59
171.58
207.56
241.96
323.06
416.78
467.22
521.64
634.15
764.77

337269598.xlsx -data-Lowering

Page 212 of 3205

JOINTING DI S/S
3

PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, excluding the cost of the g
all sundries filling with water with a water lead upto 500 m and testing to required pressure etc., com
No.3114/85.
Rate as per
WS. data

DIA of Pipe in mm
a
b
c
d
e
f
g
h
i
j
k
l

100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
650mm dia
700mm dia

Each Joint
Each Joint
Each Joint
Each Joint
Each Joint
Each Joint
Each Joint
Each Joint
Each Joint
Each Joint
Each Joint
Each Joint

96.74
119.73
133.16
152.02
174.74
206.55
205.52
234.90
256.30
299.10
320.50
341.90

m
n
p
q

750mm dia
800mm dia
900mm dia
1000mm dia

Each Joint
Each Joint
Each Joint
Each Joint

355.33
576.34
661.94
726.38

337269598.xlsx -data-Lowering

Page 213 of 3205

JOINTING DI S/S

ipes & fittings with Rubber Gasket, excluding the cost of the gasket but including
er lead upto 500 m and testing to required pressure etc., complete as per BIS

Sub- Total

96.74
119.73
133.16
152.02
174.74
206.55
205.52
234.90
256.30
299.10
320.50
341.90
355.33
576.34
661.94
726.38

Total
96.74
119.73
133.16
152.02
174.74
206.55
205.52
234.90
256.30
299.10
320.50
341.90
355.33
576.34
661.94
726.38

337269598.xlsx -data-Lowering

DATA - INFILTRATION GALLERY (2015-16)


Sn.

Description

Quantity

Excavation of trenches for infiltration galleries, syphon lines and connecting mains in all soils under water incl
strutting, bailing out water and removal of shoring and strutting materials, after completion of pipe line work.

item No.30 of PH SSR


0.00 Mts to 1.00 Mts depth below GL
Basic Rate as per PH SSR item No. 29, Pg.7
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

2.00 Mts to 5.00 Mts depth below GL


Basic Rate as per PH SSR item No. 30
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

out put

Beyond 5 m deep under water for every additional 1 m depth over


item 'c'
6.00 Mts to 7.00m
for extra depth beyond 5.00 Mts
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

0%
out put

Beyond 5 m deep under water for every additional 1 m depth over


item 'c'
5.00 Mts to 6.00m
for extra depth beyond 5.00 Mts

10.00
10 Cum

13.615%

1.00 Mts to 2.00 Mts depth below GL


Basic Rate as per PH SSR item No. 30
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

Overheads & Contractors Profit


Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum
e

out put

10.00
10 Cum

13.615%

0%
10.00
10 Cum

13.615%

0%
Depth

6.00

10 Cum
1.00 Mts
13.615%

0%
Depth

7.00

1 Cum
2.00 Mts
13.615%

0%

RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork exca
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and br
other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as direct
including protecting the existing utility services wherever it is possible during the execution and taking all pr
restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with exca
disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete fo
means.
In ordinary soils by Mechanical means for Pipe line trenches
up to 3.00 Mts depth below GL
a) Labour

out put

240.0

(2015-16)
Rate

Unit

Amount

ns in all soils under water including all leads, lifts, shoring,


pletion of pipe line work.

Cum
11671.00

10 Cum

Rs

11671.00
1589.01
13260.01
1326.00
0.00
1326.00

Rs

16717.00
2276.02
18993.02
1899.30
0.00
1899.30

Rs

25092.00
3416.28
28508.28
2850.83
0.00
2850.83

Rs

25092.00
4794.00
29886.00
4068.98
33954.98
3395.50
0.00
3395.50

Rs

25092.00
9588.00
34680.00
4721.68
39401.68
3940.17
0.00
3940.17

Cum
16717.00

10 Cum

Cum
25092.00

10 Cum

m
25092.00
4794.00

10 Cum
1 Mts

m
25092.00
4794.00

1 Cum
1 Mts

hanical means: Earthwork excavation in all kinds of soil for


t, construction of shoring and bracing, removal of stumps and
tion 304 MORTH and as directed by the departmental officer
the execution and taking all precautionary measures in the
backfilling in trenches with excavated suitable material and
ational charges etc., complete for Pipe Lines by mechanical

Cum

Page 216 of 3205

RATES FOR SLUICE VALVES & AIR VALVES ( 2014-15 SSR )


26.SoRATES FOR WATER HAMMER CONTROL DEVICES FOR THE YEAR 2014-15
1

Manufacture, Supply and delivery of zero velocity valve/ PSLV with CI body with flanged ends as per AWWA, Ex-factory excluding
transportation, Central Excise duty and sale tax etc., complete

10 Kg/Sqcm
Dia in mm

Pg. No. 71
Basic Rate

PH SSR
CED @

ST @

Transport @

CP @

Sub- Total

150

70275.00

200

73417.00

9177.13

10645.47

7341.70

10995.30

111576.60

111576.60

250

82835.00

10354.38

12011.08

8283.50

12405.78

125889.74

125889.74

300

93220.00

11652.50

13516.90

9322.00

13961.09

141672.49

141672.49

15 Kg/Sqcm
Dia in mm

Pg. No. 71
Basic Rate

14.50%
10189.88

10.00%
7027.50

13.615%
10524.74

106801.50

Total Rs.

12.50%
8784.38

106801.50

PH SSR
CED @

ST @

Transport @

CP @

12.50%

14.50%

10.00%

13.615%

Sub- Total

Total Rs.

150

82031.00

10253.88

11894.50

8203.10

12285.37

124667.85

124667.85

200

84428.00

10553.50

12242.06

8442.80

12644.36

128310.72

128310.72

250

95259.00

11907.38

13812.56

9525.90

14266.46

144771.30

144771.30

300

107203.00

13400.38

15544.44

10720.30

16055.26

162923.38

162923.38

20 Kg/Sqcm
Dia in mm

Pg. No. 71
Basic Rate

PH SSR
CED @

ST @

Transport @

CP @

12.50%

14.50%

10%

13.615%

Sub- Total

Total Rs.

150

86878.00

10859.75

12597.31

8687.80

13011.28

132034.14

132034.14

200

90762.00

11345.25

13160.49

9076.20

13592.97

137936.91

137936.91

250

102404.00

12800.50

14848.58

10240.40

15336.54

155630.02

155630.02

300

115246.00

14405.75

16710.67

11524.60

17259.82

175146.84

175146.84

25 Kg/Sqcm
Dia in mm

Pg. No. 71
Basic Rate

PH SSR
CED @

ST @

Transport @

CP @

12.50%

14.50%

10%

13.615%

Sub- Total

Total Rs.

150

95568.00

11946.00

13857.36

9556.80

14312.74

145240.90

145240.90

200

99836.00

12479.50

14476.22

9983.60

14951.94

151727.26

151727.26

250

112645.00

14080.63

16333.53

11264.50

16870.28

171193.94

171193.94

300

126768.00

15846.00

18381.36

12676.80

18985.41

192657.57

192657.57

Manufacture, Supply and delivery of zero velocity valve/ PSLV with MS Fabricated Body with Plain ends. as per AWWA, Exfactory excluding
transportation, Central Excise duty and sale tax etc. Complete

10 Kg/Sqcm
Dia in mm

Pg. 71 & 72
Basic Rate

PH SSR
CED @

ST @

Transport @

CP @

12.50%

14.50%

10.00%

13.615%

Sub- Total

Total Rs.

350

99288.00

12411.00

14396.76

9928.80

14869.87

150894.43

150894.43

400

109748.00

13718.50

15913.46

10974.80

16436.41

166791.17

166791.17

450

127645.00

15955.63

18508.53

12764.50

19116.75

193990.41

193990.41

500

147526.00

18440.75

21391.27

14752.60

22094.23

224204.85

224204.85

525 / 550

158460.00

19807.50

22976.70

15846.00

23731.76

240821.96

240821.96

600

177423.00

22177.88

25726.34

17742.30

26571.76

269641.28

269641.28

650

198604.00

24825.50

28797.58

19860.40

29743.93

301831.41

301831.41

700

231497.00

28937.13

33567.07

23149.70

34670.15

351821.05

351821.05

750

256416.00

32052.00

37180.32

25641.60

38402.14

389692.06

389692.06

800

312360.00

39045.00

45292.20

31236.00

46780.60

474713.80

474713.80

900

371260.00

46407.50

53832.70

37126.00

55601.75

564227.95

564227.95

1000

450341.00

56292.63

65299.45

45034.10

67445.32

684412.50

684412.50

1050

454844.00

56855.50

65952.38

45484.40

68119.71

691255.99

691255.99

1100

573755.00

71719.38

83194.48

57375.50

85928.42

871972.78

871972.78

1200

690565.00

86320.63

100131.93

69056.50

103422.47

1049496.53

1049496.53

1400

1035848.00

129481.00

150197.96

103584.80

155133.78

1574245.54

1574245.54

1500

1206940.00

150867.50

175006.30

120694.00

180757.37

1834265.17

1834265.17

1600

1231078.00

153884.75

178506.31

123107.80

184372.40

1870949.26

1870949.26

337269598.xlsx Valves

Page 217 of 3205

15 Kg/Sqcm
Dia in mm

Pg. 71 & 72
Basic Rate

PH SSR
CED @

ST @

Transport @

CP @

12.50%

14.50%

10.00%

13.615%

Sub- Total

Total Rs.

350

114180.00

14272.50

16556.10

11418.00

17100.17

173526.77

173526.77

400

126209.00

15776.13

18300.31

12620.90

18901.69

191808.03

191808.03

450

146793.00

18349.13

21284.99

14679.30

21984.45

223090.87

223090.87

500

169653.00

21206.63

24599.69

16965.30

25408.08

257832.70

257832.70

525 / 550

180138.00

22517.25

26120.01

18013.80

26978.37

273767.43

273767.43

600

204035.00

25504.38

29585.08

20403.50

30557.30

310085.26

310085.26

650

218467.00

27308.38

31677.72

21846.70

32718.71

332018.51

332018.51

700

254772.00

31846.50

36941.94

25477.20

38155.93

387193.57

387193.57

750

282094.00

35261.75

40903.63

28209.40

42247.81

428716.59

428716.59

800

359217.00

44902.13

52086.47

35921.70

53798.13

545925.43

545925.43

900

426949.00

53368.63

61907.61

42694.90

63942.02

648862.16

648862.16

1000

450341.00

56292.63

65299.45

45034.10

67445.32

684412.50

684412.50

1050

454844.00

56855.50

65952.38

45484.40

68119.71

691255.99

691255.99

1100

650592.00

81324.00

94335.84

65059.20

97435.91

988746.95

988746.95

1200

759637.00

94954.63

110147.37

75963.70

113767.04

1154469.74

1154469.74

1400

1139453.00

142431.63

165220.69

113945.30

170650.18

1731700.80

1731700.80

1500

1327622.00

165952.75

192505.19

132762.20

198831.31

2017673.45

2017673.45

1600

1354172.00

169271.50

196354.94

135417.20

202807.57

2058023.21

2058023.21

20 Kg/Sqcm
Dia in mm

Pg. 71 & 72
Basic Rate

PH SSR
CED @

ST @

Transport @

CP @

12.50%

14.50%

10.00%

13.615%

Sub- Total

Total Rs.

350

122744.00

15343.00

17797.88

12274.40

18382.76

186542.04

186542.04

400

135675.00

16959.38

19672.88

13567.50

20319.37

206194.13

206194.13

450

157802.00

19725.25

22881.29

15780.20

23633.22

239821.96

239821.96

500

182378.00

22797.25

26444.81

18237.80

27313.84

277171.70

277171.70

525 / 550

198399.00

24799.88

28767.86

19839.90

29713.23

301519.87

301519.87

600

219338.00

27417.25

31804.01

21933.80

32849.16

333342.22

333342.22

650

248321.00

31040.13

36006.55

24832.10

37189.79

377389.57

377389.57

700

289434.00

36179.25

41967.93

28943.40

43347.08

439871.66

439871.66

750

320552.00

40069.00

46480.04

32055.20

48007.47

487163.71

487163.71

800

386155.00

48269.38

55992.48

38615.50

57832.50

586864.86

586864.86

900

450341.00

56292.63

65299.45

45034.10

67445.32

684412.50

684412.50

1000

450341.00

56292.63

65299.45

45034.10

67445.32

684412.50

684412.50

1050

454844.00

56855.50

65952.38

45484.40

68119.71

691255.99

691255.99

1100

709321.00

88665.13

102851.55

70932.10

106231.46

1078001.24

1078001.24

1200

865389.00

108173.63

125481.41

86538.90

129604.98

1315187.92

1315187.92

1400

1298084.00

162260.50

188222.18

129808.40

194407.55

1972782.63

1972782.63

1500

1508641.00

188580.13

218752.95

150864.10

225941.62

2292779.80

2292779.80

1600

1538815.00

192351.88

223128.18

153881.50

230460.63

2338637.19

2338637.19

25 Kg/Sqcm
Dia in mm

Pg. 71 & 72
Basic Rate

PH SSR
CED @

ST @

Transport @

CP @

14.50%
19577.47

10.00%
13501.70

13.615%
20220.82

Sub- Total

Total Rs.

350

135017.00

12.50%
16877.13

205194.12

205194.12

400

149248.00

18656.00

21640.96

14924.80

22352.13

226821.89

226821.89

450

173583.00

21697.88

25169.54

17358.30

25996.66

263805.38

263805.38

500

200616.00

25077.00

29089.32

20061.60

30045.26

304889.18

304889.18

525 / 550

218238.00

27279.75

31644.51

21823.80

32684.41

331670.47

331670.47

600

241272.00

30159.00

34984.44

24127.20

36134.10

366676.74

366676.74

650

268056.00

33507.00

38868.12

26805.60

40145.41

407382.13

407382.13

700

312583.00

39072.88

45324.54

31258.30

46813.99

475052.71

475052.71

i
j

750

346231.00

43278.88

50203.50

34623.10

51853.29

526189.77

526189.77

800

424768.00

53096.00

61591.36

42476.80

63615.38

645547.54

645547.54

900

504868.00

63108.50

73205.86

50486.80

75611.56

767280.72

767280.72

1000

625798.00

78224.75

90740.71

62579.80

93722.64

951065.90

951065.90

1050

658915.00

82364.38

95542.68

65891.50

98682.40

1001395.96

1001395.96

337269598.xlsx Valves

Page 218 of 3205

1100

780255.00

97531.88

113136.98

78025.50

116854.89

1185804.25

1185804.25

1200

932309.00

116538.63

135184.81

93230.90

139627.26

1416890.60

1416890.60

1400

1398459.00

174807.38

202776.56

139845.90

209440.21

2125329.05

2125329.05

1500

1629199.00

203649.88

236233.86

162919.90

243996.99

2475999.63

2475999.63

1600

1661780.00

207722.50

240958.10

166178.00

248876.48

2525515.08

2525515.08

3
A

27. SoRATES FOR CAST STEEL VALVES FOR THE YEAR 2014-15
CCS Sluice Valves
Manufacture,supply and delivery of cast carban steel rising/Non raising spindle sluice valves design standard as per IS:14846/2000 for water
supply scheme with ss spindle & ss working parts the grade of cast steel for body Bonnet, Dome,Stool cover, Wedge Stuffing box, gland Thrust
Plate, Shall be as per IS:1030/1989.(The valve shall be used for High presure schmes &pumping stations) excluding transporation, Central
exise duty and sale tax etc., complete. ISI Marked

PN-20 - Test Pressure


Dia in mm

Basic Rate

Pg.No. 73

PH SSR

CED @

ST @

Transport @

CP @

12.50%

14.50%

10%

13.615%

Sub- Total

Total Rs.

40

5729.00

716.13

830.71

572.90

858.00

8706.74

8706.74

50

9440.00

1180.00

1368.80

944.00

1413.78

14346.58

14346.58

65

11814.00

1476.75

1713.03

1181.40

1769.32

17954.50

17954.50

80

14169.00

1771.13

2054.51

1416.90

2122.02

21533.56

21533.56

100

18897.00

2362.13

2740.07

1889.70

2830.11

28719.01

28719.01

125

24235.00

3029.38

3514.08

2423.50

3629.55

36831.51

36831.51

150

28354.00

3544.25

4111.33

2835.40

4246.44

43091.42

43091.42

200

45794.00

5724.25

6640.13

4579.40

6858.34

69596.12

69596.12

i
j

250

64454.00

8056.75

9345.83

6445.40

9652.95

97954.93

97954.93

300

81420.00

10177.50

11805.90

8142.00

12193.87

123739.27

123739.27

350

108570.00

13571.25

15742.65

10857.00

16259.99

165000.89

165000.89

400

220547.00

27568.38

31979.32

22054.70

33030.22

335179.62

335179.62

450

247206.00

30900.75

35844.87

24720.60

37022.81

375695.03

375695.03

500

290831.00

36353.88

42170.50

29083.10

43556.30

441994.78

441994.78

600

332031.00

41503.88

48144.50

33203.10

49726.62

504609.10

504609.10

700

642251.00

80281.38

93126.40

64225.10

96186.72

976070.60

976070.60

750

690723.00

86340.38

100154.84

69072.30

103446.13

1049736.65

1049736.65

800

799784.00

99973.00

115968.68

79978.40

119779.65

1215483.73

1215483.73

900

945201.00

118150.13

137054.15

94520.10

141558.03

1436483.41

1436483.41

1000

1211796.00

151474.50

175710.42

121179.60

181484.63

1841645.15

1841645.15

1100

1308739.00

163592.38

189767.16

130873.90

196003.30

1988975.74

1988975.74

1200

1478390.00

184798.75

214366.55

147839.00

221411.08

2246805.38

2246805.38

PN-30 - Test Pressure

Dia in mm

Basic Rate

Pg.No. 73

PH SSR

CED @

ST @

Transport @

CP @

12.50%

14.50%

10.00%

13.615%

Sub- Total

Total Rs.

40

11458.00

1432.25

1661.41

1145.80

1716.01

17413.47

50

17185.00

2148.13

2491.83

1718.50

2573.71

26117.17

17413.47
26117.17

65

21482.00

2685.25

3114.89

2148.20

3217.25

32647.59

32647.59

80

25779.00

3222.38

3737.96

2577.90

3860.79

39178.03

39178.03

100

34371.00

4296.38

4983.80

3437.10

5147.57

52235.85

52235.85

125

44065.00

5508.13

6389.43

4406.50

6599.39

66968.45

66968.45

150

51556.00

6444.50

7475.62

5155.60

7721.28

78353.00

78353.00

200

93089.00

11636.13

13497.91

9308.90

13941.47

141473.41

141473.41

i
j

250

146517.00

18314.63

21244.97

14651.70

21943.12

222671.42

222671.42

300

185074.00

23134.25

26835.73

18507.40

27717.61

281268.99

281268.99

350

246766.00

30845.75

35781.07

24676.60

36956.91

375026.33

375026.33

400

501243.00

62655.38

72680.24

50124.30

75068.66

761771.58

761771.58

450

550816.00

68852.00

79868.32

55081.60

82492.96

837110.88

837110.88

500

660979.00

82622.38

95841.96

66097.90

98991.52

1004532.76

1004532.76

600

753517.00

94189.63

109259.97

75351.70

112850.47

1145168.77

1145168.77

CI - NON - RETURN VALVES


4

Manfacture, Supply and delivery of Cast Carbon Steel Bolted Cover Non Return Valve as per IS:5312/Part 1/1984.Round body heavy duty
material spec. As per IS:1030/1989 with SS Hinge &Seat Rings.including transporation, Central Exercise duty and sale tax etc., complete

PN-20- Test pressure


Dia in mm

Basic Rate

CED @

ST @

Transport

337269598.xlsx Valves

CP @

Sub- Total

Total Rs.

Dia in mm

Basic Rate

Page 219 of 3205

Sub- Total
12.50%

14.50%

10%

Total Rs.

13.615%

40

5695.00

711.88

825.78

569.50

852.91

8655.07

8655.07

50

8475.00

1059.38

1228.88

847.50

1269.26

12880.02

12880.02

65

10591.00

1323.88

1535.70

1059.10

1586.16

16095.84

16095.84

80

12710.00

1588.75

1842.95

1271.00

1903.51

19316.21

19316.21

100

17439.00

2179.88

2528.66

1743.90

2611.75

26503.19

26503.19

125

21813.00

2726.63

3162.89

2181.30

3266.82

33150.64

33150.64

150

23983.00

2997.88

3477.54

2398.30

3591.81

36448.53

36448.53

200

36354.00

4544.25

5271.33

3635.40

5444.56

55249.54

55249.54

250

50896.00

6362.00

7379.92

5089.60

7622.44

77349.96

77349.96

300

72707.00

9088.38

10542.52

7270.70

10888.96

110497.56

110497.56

350

96944.00

12118.00

14056.88

9694.40

14518.82

147332.10

147332.10

400

198735.00

24841.88

28816.58

19873.50

29763.55

302030.51

302030.51

450

222971.00

27871.38

32330.80

22297.10

33393.25

338863.53

338863.53

500

261748.00

32718.50

37953.46

26174.80

39200.69

397795.45

397795.45

600

302948.00

37868.50

43927.46

30294.80

45371.01

460409.77

460409.77

PN-30- Test pressure


Dia in mm

Basic Rate

CED @

ST @

Transport

CP @

12.50%

14.50%

10.00%

13.615%

Sub- Total

Total Rs.

40

10356.00

1294.50

1501.62

1035.60

1550.97

15738.69

15738.69

50

15422.00

1927.75

2236.19

1542.20

2309.68

23437.82

23437.82

65

19279.00

2409.88

2795.46

1927.90

2887.32

29299.56

29299.56

80

23135.00

2891.88

3354.58

2313.50

3464.81

35159.77

35159.77

100

30847.00

3855.88

4472.82

3084.70

4619.80

46880.20

46880.20

125

39660.00

4957.50

5750.70

3966.00

5939.68

60273.88

60273.88

150

43624.00

5453.00

6325.48

4362.40

6533.35

66298.23

66298.23

200

79317.00

9914.63

11500.97

7931.70

11878.91

120543.21

120543.21

250

132196.00

16524.50

19168.42

13219.60

19798.33

200906.85

200906.85

300

165245.00

20655.63

23960.53

16524.50

24747.92

251133.58

251133.58

350

220327.00

27540.88

31947.42

22032.70

32997.27

334845.27

334845.27

400

451669.00

56458.63

65492.01

45166.90

67644.21

686430.75

686430.75

450

506751.00

63343.88

73478.90

50675.10

75893.56

770142.44

770142.44

500

594882.00

74360.25

86257.89

59488.20

89092.50

904080.84

904080.84

600

688519.00

86064.88

99835.26

68851.90

103116.05

1046387.09

1046387.09

Manufacture, Supply and delivery of Cast Steel Multi Door Type Non return Valve as per IS; 5312/ Part II / 1984 Heavy duty material spec. as
per 1030/1989 with SS hinges & Seat Rings excluding transportation, Central Excise duty and sale tax etc., complete.

PN-20- Test pressure


Dia in mm

Basic Rate

CED @

ST @

Transport

CP @

12.50%

14.50%

10.00%

13.615%

Sub- Total

Total Rs.

500

440652.00

55081.50

63894.54

44065.20

65994.25

669687.49

600

550816.00

68852.00

79868.32

55081.60

82492.96

837110.88

837110.88

700

660979.00

82622.38

95841.96

66097.90

98991.52

1004532.76

1004532.76

750

815208.00

101901.00

118205.16

81520.80

122089.63

1238924.59

1238924.59

800

1211796.00

151474.50

175710.42

121179.60

181484.63

1841645.15

1841645.15

900

1454154.00

181769.25

210852.33

145415.40

217781.37

2209972.35

2209972.35

1000

1586349.00

198293.63

230020.61

158634.90

237579.56

2410877.70

2410877.70

1100

1872775.00

234096.88

271552.38

187277.50

280476.15

2846177.91

2846177.91

1200

1894807.00

236850.88

274747.02

189480.70

283775.77

2879661.37

2879661.37

Manufacture, Supply and delivery of Cast Steel D/F Butter fly Valves conforming to IS;
operation,excluding transportation, Central Excise duty and sale tax etc., complete.

PN-1.0/1.6- Test pressure


Dia in mm

Basic Rate

CED @

ST @

Transport

CP @

12.50%

14.50%

10.00%

13.615%

669687.49

13095/1991 manually heavy duty Gear

Sub- Total

Total Rs.

300

84104.00

10513.00

12195.08

8410.40

12595.84

127818.32

127818.32

350

113138.00

14142.25

16405.01

11313.80

16944.11

171943.17

171943.17

337269598.xlsx Valves

Page 220 of 3205

400

135950.00

16993.75

19712.75

13595.00

20360.55

206612.05

206612.05

450

164752.00

20594.00

23889.04

16475.20

24674.08

250384.32

250384.32

500

187795.00

23474.38

27230.28

18779.50

28125.12

285404.28

285404.28

600

218902.00

27362.75

31740.79

21890.20

32783.86

332679.60

332679.60

700

343330.00

42916.25

49782.85

34333.00

51418.82

521780.92

521780.92

750

426282.00

53285.25

61810.89

42628.20

63842.12

647848.46

647848.46

800

467758.00

58469.75

67824.91

46775.80

70053.78

710882.24

710882.24

66246.50

76845.94

52997.20

79371.26

805432.90

805432.90

900

529972.00

1000

841043.00

105130.38

121951.24

84104.30

125958.80

1278187.72

1278187.72

1100

1048423.00

131052.88

152021.34

104842.30

157017.07

1593356.59

1593356.59

1200

1255803.00

156975.38

182091.44

125580.30

188075.34

1908525.46

1908525.46

1300

1682084.00

210260.50

243902.18

168208.40

251917.31

2556372.39

2556372.39

1400

1774253.00

221781.63

257266.69

177425.30

265721.00

2696447.62

2696447.62

1500

1877944.00

234743.00

272301.88

187794.40

281250.28

2854033.56

2854033.56

1600

2189014.00

273626.75

317407.03

218901.40

327837.68

3326786.86

3326786.86

1800

2707465.00

338433.13

392582.43

270746.50

405483.50

4114710.56

4114710.56

2000

3744366.00

468045.75

542933.07

374436.60

560774.97

5690556.39

5690556.39

PN - 2.5 Test pressure

Dia in mm

Basic Rate

CED @

ST @

Transport

CP @

12.50%

14.50%

10.00%

13.615%

Sub- Total

Total Rs.

300

104843.00

13105.38

15202.24

10484.30

15701.81

159336.73

159336.73

350

142171.00

17771.38

20614.80

14217.10

21292.24

216066.52

216066.52

400

176273.00

22034.13

25559.59

17627.30

26399.53

267893.55

267893.55

450

208532.00

26066.50

30237.14

20853.20

31230.79

316919.63

316919.63

500

239639.00

29954.88

34747.66

23963.90

35889.53

364194.97

364194.97

600

281115.00

35139.38

40761.68

28111.50

42101.19

427228.75

427228.75

700

426282.00

53285.25

61810.89

42628.20

63842.12

647848.46

647848.46

750

529972.00

66246.50

76845.94

52997.20

79371.26

805432.90

805432.90

800

581817.00

72727.13

84363.47

58181.70

87135.82

884225.12

884225.12

900

664769.00

83096.13

96391.51

66476.90

99559.13

1010292.67

1010292.67

1000

1048423.00

131052.88

152021.34

104842.30

157017.07

1593356.59

1593356.59

1100

1359493.00

169936.63

197126.49

135949.30

203604.47

2066109.89

2066109.89

1200

1359493.00

169936.63

197126.49

135949.30

203604.47

2066109.89

2066109.89

1300

1877944.00

234743.00

272301.88

187794.40

281250.28

2854033.56

2854033.56

1400

1981634.00

247704.25

287336.93

198163.40

296779.42

3011618.00

3011618.00

1500

2085324.00

260665.50

302371.98

208532.40

312308.55

3169202.43

3169202.43

1600

2500085.00

312510.63

362512.33

250008.50

374425.23

3799541.69

3799541.69

1800

2914845.00

364355.63

422652.53

291484.50

436541.76

4429879.42

4429879.42

2000

4055436.00

506929.50

588038.22

405543.60

607362.37

6163309.69

6163309.69

DI VALVES

Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade
as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets
and seals of EPDM food grade quality.S Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538.

28. SoRATES FOR DI D/F VALVES FOR THE YEAR 2014-15. Rate/Each in Rs.

DI Air Valves - PN-10 - Test Pressure


A

Dia in mm

Basic Rate

CED @

ST @

Transport @

CP @

14.50%
1306.31

5.00%
450.45

13.615%
1287.90

Sub- Total

Total Rs.

25 (Screwed End)

9009.00

12.50%
1126.13

13179.79

13179.79

32 (Screwed End)

17919.00

2239.88

2598.26

895.95

2561.66

26214.75

26214.75

40 (Screwed End)

18810.00

2351.25

2727.45

940.50

2689.03

27518.23

27518.23

50

32363.00

4045.38

4692.64

1618.15

4626.53

47345.70

47345.70

80

43175.00

5396.88

6260.38

2158.75

6172.19

63163.20

63163.20

100

50408.00

6301.00

7309.16

2520.40

7206.20

73744.76

73744.76

150

61366.00

7670.75

8898.07

3068.30

8772.73

89775.85

89775.85

200

67210.00

8401.25

9745.45

3360.50

9608.17

98325.37

98325.37

300

108900.00

13612.50

15790.50

5445.00

15568.07

159316.07

159316.07

337269598.xlsx Valves

Page 221 of 3205

DI Air Valves - PN-16 - Test Pressure


Dia in mm

Basic Rate

CED @

ST @

Transport @

CP @

14.50%
1306.31

5.00%
450.45

13.615%
1287.90

Sub- Total

Total Rs.

25 (Screwed End)

9009.00

12.50%
1126.13

13179.79

13179.79

32 (Screwed End)

17919.00

2239.88

2598.26

895.95

2561.66

26214.75

26214.75

40 (Screwed End)

18810.00

2351.25

2727.45

940.50

2689.03

27518.23

27518.23

50

32363.00

4045.38

4692.64

1618.15

4626.53

47345.70

47345.70

80

43175.00

5396.88

6260.38

2158.75

6172.19

63163.20

63163.20

100

50408.00

6301.00

7309.16

2520.40

7206.20

73744.76

73744.76

150

61366.00

7670.75

8898.07

3068.30

8772.73

89775.85

89775.85

200

67210.00

8401.25

9745.45

3360.50

9608.17

98325.37

98325.37

300

108900.00

13612.50

15790.50

5445.00

15568.07

159316.07

159316.07

Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body
bonnet of ductile cast iron of grade GGG40/ SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully
rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face
dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and
outside pocket less body passage. Drilled as per IS:1538.
Rates vide Table.No.28 Pg. of SSR-2014-15 ( PH items)

PN-10 - Test Pressure


Dia in mm

Basic Rate

CED @

APG ST @

Transport

CP @

12.50%

14.50%

5.00%

13.615%

Sub- Total

Total Rs.

50

7747.00

968.38

1123.32

387.35

1107.49

11333.54

11333.54

80

9922.00

1240.25

1438.69

496.10

1418.42

14515.46

14515.46

100

13088.00

1636.00

1897.76

654.40

1871.03

19147.19

19147.19

150

20607.00

2575.88

2988.02

1030.35

2945.93

30147.18

30147.18

200

34244.00

4280.50

4965.38

1712.20

4895.44

50097.52

50097.52

250

47429.00

5928.63

6877.21

2371.45

6780.33

69386.62

69386.62

300

71682.00

8960.25

10393.89

3584.10

10247.48

104867.72

104867.72

350

217030.00

27128.75

31469.35

10851.50

31026.07

317505.67

317505.67

i
j

400

227631.00

28453.88

33006.50

11381.55

32541.56

333014.49

333014.49

450 With By-pass &


Gear
500 With By-pass &
Gear
600 With By-pass &
Gear

391622.00

48952.75

56785.19

19581.10

55985.30

572926.34

572926.34

415877.00

51984.63

60302.17

20793.85

59452.74

608410.39

608410.39

535531.00

66941.38

77652.00

26776.55

76558.17

783459.10

783459.10

k
L
B

PN-16 - Test Pressure


Dia in mm

Basic Rate

CED @

ST @

Transport

CP @

12.50%

14.50%

5%

13.615%

Sub- Total

Total Rs.

50

7747.00

968.38

1123.32

387.35

1107.49

11333.54

11333.54

80

9922.00

1240.25

1438.69

496.10

1418.42

14515.46

14515.46

100

13088.00

1636.00

1897.76

654.40

1871.03

19147.19

19147.19

150

20607.00

2575.88

2988.02

1030.35

2945.93

30147.18

30147.18

200

34244.00

4280.50

4965.38

1712.20

4895.44

50097.52

50097.52

250

47429.00

5928.63

6877.21

2371.45

6780.33

69386.62

69386.62

300

71682.00

8960.25

10393.89

3584.10

10247.48

104867.72

104867.72

350

217030.00

27128.75

31469.35

10851.50

31026.07

317505.67

317505.67

i
j

400

227631.00

28453.88

33006.50

11381.55

32541.56

333014.49

333014.49

450 With By-pass &


Gear
500 With By-pass &
Gear
600 With By-pass &
Gear

391622.00

48952.75

56785.19

19581.10

55985.30

572926.34

572926.34

415877.00

51984.63

60302.17

20793.85

59452.74

608410.39

608410.39

535531.00

66941.38

77652.00

26776.55

76558.17

783459.10

783459.10

k
l

PN-25 - Test Pressure


Dia in mm

Basic Rate

CED @

ST @

Transport

CP @

12.50%

14.50%

5%

13.615%

Sub- Total

Total Rs.

50

13094.00

1636.75

1898.63

654.70

1871.89

19155.97

19155.97

80

16144.00

2018.00

2340.88

807.20

2307.91

23617.99

23617.99

100

18304.00

2288.00

2654.08

915.20

2616.69

26777.97

26777.97

150

30531.00

3816.38

4427.00

1526.55

4364.64

44665.57

44665.57

200

51495.00

6436.88

7466.78

2574.75

7361.60

75335.01

75335.01

337269598.xlsx Valves

Page 222 of 3205

250

76487.00

9560.88

11090.62

3824.35

10934.39

111897.24

111897.24

300

124065.00

15508.13

350

363053.00

45381.63

17989.43

6203.25

17736.02

181501.83

181501.83

52642.69

18152.65

51901.15

531131.12

400

369274.00

531131.12

46159.25

53544.73

18463.70

52790.49

540232.17

540232.17

450 With By-pass &


Gear

736134.00

92016.75

106739.43

36806.70

105235.88

1076932.76

1076932.76

500 With By-pass &


Gear

781725.00

97715.63

113350.13

39086.25

111753.45

1143630.46

1143630.46

600 With By-pass &


Gear

1006636.00

125829.50

145962.22

50331.80

143906.17

1472665.69

1472665.69

Manufacture, Supply and delivery of DI D/F Butterfly Valves with GGG40/SG 400/12 or Equivalent grade as per I.S.3896-part 2-1985 and
subsequent revisions, Double eccentrically Disc., with renewable soft seal on the disc and Body seat face of stainless steel / nickel weld
overlay, with powder or liquid Epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside. Face to
face dimensions as per AWWA C 504 or BS 5155 or IS:13095. Drilled as per IS: 1538/ISO
PN-10 - Test Pressure

Dia in mm

Table 28

Basic Rate

CED @

Pg.77
ST @

Transport

CP @

Sub- Total

150

82590.00

120825.66

120825.66

200

89954.00

11244.25

13043.33

4497.70

12859.60

131598.88

131598.88

250

104808.00

13101.00

15197.16

5240.40

14983.09

153329.65

153329.65

300

125059.00

15632.38

18133.56

6252.95

17878.12

182956.01

182956.01

350

143087.00

17885.88

20747.62

7154.35

20455.36

209330.21

209330.21

400

180221.00

22527.63

26132.05

9011.05

25763.94

263655.67

263655.67

450

197850.00

24731.25

28688.25

9892.50

28284.14

289446.14

289446.14

500

199731.00

24966.38

28961.00

9986.55

28553.04

292197.97

292197.97

i
j

600

261775.00

32721.88

37957.38

13088.75

37422.70

382965.71

382965.71

700

516789.00

64598.63

74934.41

25839.45

73878.86

756040.35

756040.35

800

560262.00

70032.75

81237.99

28013.10

80093.65

819639.49

819639.49

900

732712.00

91589.00

106243.24

36635.60

104746.68

1071926.52

1071926.52

1000

918489.00

114811.13

133180.91

45924.45

131304.89

1343710.38

1343710.38

1100

1056263.00

132032.88

153158.14

52813.15

151000.72

1545267.89

1545267.89

1200

1230671.00

153833.88

178447.30

61533.55

175933.65

1800419.38

1800419.38

1400

2644951.00

330618.88

383517.90

132247.55

378115.58

3869450.91

3869450.91

1600

3153860.00

394232.50

457309.70

157693.00

450867.94

4613963.14

4613963.14

1800

3868391.00

483548.88

560916.70

193419.55

553015.51

5659291.64

5659291.64

2000

6608212.00

826026.50

958190.74

330410.60

944693.47

9667533.31

9667533.31

2200

9540251.00

1192531.38

1383336.40

477012.55

1363850.43

13956981.76

13956981.76

PN-16 - Test Pressure

Dia in mm

14.50%
11975.55

5.00%
4129.50

13.615%
11806.86

Total Rs.

12.50%
10323.75

Table 28

Basic Rate

Pg.77

CED @

ST @

Transport

CP @

12.50%

14.50%

5.00%

13.615%

Sub- Total

Total Rs.

150

82590.00

10323.75

11975.55

4129.50

11806.86

120825.66

120825.66

200

92874.00

11609.25

13466.73

4643.70

13277.03

135870.71

135870.71

250

107855.00

13481.88

15638.98

5392.75

15418.68

157787.29

157787.29

300

128741.00

16092.63

18667.45

6437.05

18404.49

188342.62

188342.62

350

156102.00

19512.75

22634.79

7805.10

22315.95

228370.59

228370.59

400

204182.00

25522.75

29606.39

10209.10

29189.35

298709.59

298709.59

450

219588.00

27448.50

31840.26

10979.40

31391.75

321247.91

321247.91

500

235759.00

29469.88

34185.06

11787.95

33703.52

344905.41

344905.41

i
j

600

369600.00

46200.00

53592.00

18480.00

52837.09

540709.09

540709.09

700

545294.00

68161.75

79067.63

27264.70

77953.87

797741.95

797741.95

800

583871.00

72983.88

84661.30

29193.55

83468.74

854178.47

854178.47

900

732712.00

91589.00

106243.24

36635.60

104746.68

1071926.52

1071926.52

1000

918489.00

114811.13

133180.91

45924.45

131304.89

1343710.38

1343710.38

1100

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1200

1230671.00

153833.88

178447.30

61533.55

175933.65

1800419.38

1800419.38

1400

2644951.00

330618.88

383517.90

132247.55

378115.58

3869450.91

3869450.91

1600

3153860.00

394232.50

457309.70

157693.00

450867.94

4613963.14

4613963.14

1800

3868391.00

483548.88

560916.70

193419.55

553015.51

5659291.64

5659291.64

2000

6608212.00

826026.50

958190.74

330410.60

944693.47

9667533.31

9667533.31

2200

9540251.00

1192531.38

1383336.40

477012.55

1363850.43

13956981.76

13956981.76

PN-25 - Test Pressure


Dia in mm

Basic Rate

Table 28
CED @

Pg.77
ST @

Transport

337269598.xlsx Valves

CP @

Sub- Total

Total Rs.

Page 223 of 3205

Dia in mm

Basic Rate

Sub- Total
12.50%

14.50%

5.00%

Total Rs.

13.615%

150

85256.00

10657.00

12362.12

4262.80

12187.98

124725.90

124725.90

200

109124.00

13640.50

15822.98

5456.20

15600.09

159643.77

159643.77

250

126328.00

15791.00

18317.56

6316.40

18059.54

184812.50

184812.50

300

143595.00

17949.38

20821.28

7179.75

20527.98

210073.39

210073.39

350

181811.00

22726.38

26362.60

9090.55

25991.25

265981.78

265981.78

400

237727.00

29715.88

34470.42

11886.35

33984.86

347784.51

347784.51

450

279661.00

34957.63

40550.85

13983.05

39979.64

409132.17

409132.17

500

374904.00

46863.00

54361.08

18745.20

53595.34

548468.62

548468.62

i
j

600

435149.00

54393.63

63096.61

21757.45

62207.81

636604.50

636604.50

700

819554.00

102444.25

118835.33

40977.70

117161.39

1198972.67

1198972.67

800

1196170.00

149521.25

173444.65

59808.50

171001.47

1749945.87

1749945.87

900

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1000

1734523.00

216815.38

251505.84

86726.15

247963.07

2537533.44

2537533.44

1100

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1200

1937679.00

242209.88

280963.46

96883.95

277005.75

2834742.04

2834742.04

PN- 40 - Test Pressure

Dia in mm

Table 28

Basic Rate

Pg.77

CED @

ST @

Transport

CP @

12.50%

14.50%

5.00%

13.615%

Sub- Total

Total Rs.

150

113188.00

14148.50

16412.26

5659.40

16181.07

165589.23

165589.23

200

137629.00

17203.63

19956.21

6881.45

19675.10

201345.39

201345.39

250

192858.00

24107.25

27964.41

9642.90

27570.50

282143.06

282143.06

300

202507.00

25313.38

29363.52

10125.35

28949.89

296259.14

296259.14

350

220409.00

27551.13

31959.31

11020.45

31509.12

322449.01

322449.01

400

336972.00

42121.50

48860.94

16848.60

48172.67

492975.71

492975.71

450

0.00

0.00

0.00

0.00

0.00

0.00

0.00

500

416406.00

52050.75

60378.87

20820.30

59528.36

609184.28

609184.28

600

456271.00

57033.88

66159.30

22813.55

65227.36

667505.09

667505.09

10 Manufacture, Supply and delivery of DI D/F Swing Check Valves Slanted/Straight seated with metallic, corrosion proof and wear resistant seat
faces resilient seat, Body and Disc of ductile cast iron GGG 40/SG Iron 420/12 or equivalent grade as per IS 3896(part2)-1985 and subsequent
revisions. All the inside and outside of the body is to be coated with double coating of epoxy liquid. Drilled as per IS:1538. Specification and
Dimensions as per I.S 5312 or equivalent codes.
PN- 10 - Test Pressure

Dia in mm

Basic Rate

Table 28

Pg.78

CED @

ST @

Transport

CP @

12.50%

14.50%

5.00%

13.615%

Sub- Total

Total Rs.

100

32726.00

4090.75

4745.27

1636.30

4678.43

47876.75

150

54954.00

6869.25

7968.33

2747.70

7856.09

80395.37

80395.37

200

83337.00

10417.13

12083.87

4166.85

11913.65

121918.50

121918.50

250

91714.00

11464.25

13298.53

4585.70

13111.20

134173.68

134173.68

300

114962.00

14370.25

16669.49

5748.10

16434.68

168184.52

168184.52

350

135304.00

16913.00

19619.08

6765.20

19342.72

197944.00

197944.00

400

164364.00

20545.50

23832.78

8218.20

23497.07

240457.55

240457.55

500

208982.00

26122.75

30302.39

10449.10

29875.54

305731.78

305731.78

600

313546.00

39193.25

45464.17

15677.30

44823.75

458704.47

458704.47

700

452569.00

56571.13

65622.51

22628.45

64698.13

662089.22

662089.22

800

565875.00

70734.38

82051.88

28293.75

80896.08

827851.09

827851.09

PN- 16 - Test Pressure


Dia in mm

Basic Rate

Table 28

47876.75

Pg.78

CED @

ST @

Transport

CP @

12.50%

14.50%

5.00%

13.615%

Sub- Total

Total Rs.

100

36362.00

4545.25

5272.49

1818.10

5198.22

53196.06

150

61060.00

7632.50

8853.70

3053.00

8728.98

89328.18

89328.18

200

88295.00

11036.88

12802.78

4414.75

12622.43

129171.84

129171.84

250

97269.00

12158.63

14104.01

4863.45

13905.33

142300.42

142300.42

300

121800.00

15225.00

17661.00

6090.00

17412.22

178188.22

178188.22

350

143424.00

17928.00

20796.48

7171.20

20503.54

209823.22

209823.22

400

174194.00

21774.25

25258.13

8709.70

24902.34

254838.42

254838.42

500

221634.00

27704.25

32136.93

11081.70

31684.24

324241.12

324241.12

600

332395.00

41549.38

48197.28

16619.75

47518.36

486279.77

486279.77

700

493551.00

61693.88

71564.90

24677.55

70556.82

722044.15

722044.15

800

616721.00

77090.13

89424.55

30836.05

88164.89

902236.62

902236.62

337269598.xlsx Valves

53196.06

Page 224 of 3205

PN- 25 - Test Pressure


Dia in mm

Basic Rate

Table 28
CED @

Pg.78
ST @

Transport

CP @

200

129492.00

189441.29

189441.29

250

157270.00

19658.75

22804.15

7863.50

22482.93

230079.33

230079.33

300

191459.00

23932.38

27761.56

9572.95

27370.50

280096.39

280096.39

350

217786.00

27223.25

31578.97

10889.30

31134.14

318611.66

318611.66

400

220520.00

27565.00

31975.40

11026.00

31524.99

322611.39

322611.39

500

279496.00

34937.00

40526.92

13974.80

39956.05

408890.77

408890.77

600

412024.00

51503.00

59743.48

20601.20

58901.92

602773.60

602773.60

700

603279.00

75409.88

87475.46

30163.95

86243.26

882571.55

882571.55

800

760709.00

95088.63

110302.81

38035.45

108749.06

1112884.95

1112884.95

Dia in mm

Basic Rate

5.00%
6474.60

13.615%
18511.85

Total Rs.

PN- 40 - Test Pressure

14.50%
18776.34

Sub- Total

12.50%
16186.50

Table 28

Pg.78

CED @

ST @

Transport

CP @

12.50%

14.50%

5.00%

13.615%

Sub- Total

Total Rs.

200

169494.00

21186.75

24576.63

8474.70

24230.44

247962.52

247962.52

250

198726.00

24840.75

28815.27

9936.30

28409.37

290727.69

290727.69

300

242572.00

30321.50

35172.94

12128.60

34677.49

354872.53

354872.53

350

264795.00

33099.38

38395.28

13239.75

37854.43

387383.84

387383.84

400

286762.00

35845.25

41580.49

14338.10

40994.78

419520.62

419520.62

500

367792.00

45974.00

53329.84

18389.60

52578.62

538064.06

538064.06

600

532563.00

66570.38

77221.64

26628.15

76133.88

779117.05

779117.05

700

765019.00

95627.38

110927.76

38250.95

109365.20

1119190.29

1119190.29

800

963725.00

120465.63

139740.13

48186.25

137771.72

1409888.73

1409888.73

11 Manufacture, supply and delivery of DI (Ductile Iron) Wafer Butterfly valves conforming to IS 13095-1991. With hand lever below 150 mm, with
Worm gear for 200 mm and above including transportation, CED and taxes etc, completed
PN- 10 - Test Pressure

Dia in mm

Basic Rate

Table 28
CED @

Pg.78
ST @

Transport

CP @

14.50%
813.45

5.00%
280.50

13.615%
801.99

Sub- Total

Total Rs.

40

5610.00

12.50%
701.25

8207.19

8207.19

50

5610.00

701.25

813.45

280.50

801.99

8207.19

8207.19

65

6071.00

758.88

880.30

303.55

867.89

8881.62

8881.62

80

6620.00

827.50

959.90

331.00

946.38

9684.78

9684.78

100

9307.00

1163.38

1349.52

465.35

1330.51

13615.76

13615.76

125

11696.00

1462.00

1695.92

584.80

1672.03

17110.75

17110.75

150

15795.00

1974.38

2290.28

789.75

2258.01

23107.42

23107.42

200

21430.00

2678.75

3107.35

1071.50

3063.58

31351.18

31351.18

250

28518.00

3564.75

4135.11

1425.90

4076.86

41720.62

41720.62

300

40127.00

5015.88

5818.42

2006.35

5736.46

58704.11

58704.11

350

48695.00

6086.88

7060.78

2434.75

6961.32

71238.73

71238.73

PN- 10 - Test Pressure

Dia in mm

Basic Rate

Table 28
CED @

Pg.78
ST @

Transport

CP @

14.50%
813.45

5.00%
280.50

13.615%
801.99

Sub- Total

Total Rs.

40

5610.00

12.50%
701.25

8207.19

8207.19

50

5610.00

701.25

813.45

280.50

801.99

8207.19

8207.19

65

6071.00

758.88

880.30

303.55

867.89

8881.62

8881.62

80

7255.00

906.88

1051.98

362.75

1037.16

10613.77

10613.77

100

9648.00

1206.00

1398.96

482.40

1379.25

14114.61

14114.61

125

11696.00

1462.00

1695.92

584.80

1672.03

17110.75

17110.75

150

16137.00

2017.13

2339.87

806.85

2306.91

23607.76

23607.76

200

21430.00

2678.75

3107.35

1071.50

3063.58

31351.18

31351.18

250

28518.00

3564.75

4135.11

1425.90

4076.86

41720.62

41720.62

300

40127.00

5015.88

5818.42

2006.35

5736.46

58704.11

58704.11

350

52824.00

6603.00

7659.48

2641.20

7551.59

77279.27

77279.27

12 Manufacture and supply of Air Release Vacuum Break Surge Alleviation Valve for potable water. Construction material Cylindrical Body of

Ductile Iron GGG-50/SG-500-7, Three cylindrical Floats of High Density Poly Ethylene. Baffle Plate, Orifice venture and all construction bolts of
stainless steel, coating internally and externally. Electrostatically applied epoxy (1) Flange connection as per IS 1538, (2) Female (BSP/NTP
Threaded for sizes 25 mm

PN- 10 & 16- Test Pressure


Dia in mm

Basic Rate

Table 28

Pg.79

CED @

ST @

Transport

CP @

12.50%

14.50%

5.00%

13.615%

337269598.xlsx Valves

Sub- Total

Total Rs.

Page 225 of 3205

25 (PN-10)

14814.00

1851.75

2148.03

740.70

2117.77

21672.25

50 (PN-16)

47740.00

5967.50

6922.30

2387.00

6824.79

69841.59

69841.59

80 (PN-16)

74896.00

9362.00

10859.92

3744.80

10706.94

109569.66

109569.66

100 (PN-16)

82583.00

10322.88

11974.54

4129.15

11805.86

120815.43

120815.43

125 (PN-16)

169358.00

21169.75

24556.91

8467.90

24211.00

247763.56

247763.56

150 (PN-16)

254354.00

31794.25

36881.33

12717.70

36361.81

372109.09

372109.09

PN- 25- Test Pressure


Dia in mm

Table 28
Basic Rate

CED @

50

47740.00

12.50%
5967.50

80

74896.00

9362.00

21672.25

Pg.79
ST @

Transport

CP @

Sub- Total

Total Rs.

14.50%
6922.30

5.00%
2387.00

13.615%
6824.79

69841.59

69841.59

10859.92

3744.80

10706.94

109569.66

109569.66

100

82583.00

10322.88

11974.54

4129.15

11805.86

120815.43

120815.43

125

169358.00

21169.75

24556.91

8467.90

24211.00

247763.56

247763.56

150

254354.00

31794.25

36881.33

12717.70

36361.81

372109.09

372109.09

13

Manufacturer and supply of Metal Seated Gate Valve Non- Rising Stem with by-pass & gear operated, for water and sewage applications&
dimensions confirming to IS 14846-2000. Material construction Body, Bonnet, Wedge and Distance Piece of ductile iron GGG-50/SG500/7
DIN1693 or equivalent. Body seat, Wedge seat and Stem nut of Aluminum Bronze BS EN 1982 CC331G/equivalent, Stem of Stainless steel BS
EN 100881.4057 or equivalent. 'O' Seal Body/Cover is of EPDM food grade Quality. Fastners is of Steel Sheraplex coated to BS 3692 Gr 8.8 or
equivalent. Body and Bonnet internally and externally blue two pack epoxy to WIS 4-52-01 Class B. Leakage tested for seat 1.1 PN and body
1.5 x PN. Flange connection as per IS 1538
PN -10. Test Pressure
Dia in mm

Table 28
Basic Rate

CED @

Pg.79
ST @

Transport

CP @

5.00%
68609.50

13.615%
196164.85

Total Rs.

DN 700

1372190.00

2007455.65

2007455.65

DN 800

1734934.00

216866.75

251565.43

86746.70

248021.83

2538134.71

2538134.71

DN 900

1961180.00

245147.50

284371.10

98059.00

280365.39

2869122.99

2869122.99

DN 1000

2197338.00

274667.25

318614.01

109866.90

314125.95

3214612.11

3214612.11

DN 1100

3403190.00

425398.75

493462.55

170159.50

486511.53

4978722.33

4978722.33

DN 1200

2994069.00

374258.63

434140.01

149703.45

428024.62

4380195.71

4380195.71

PN -16. Test Pressure


Dia in mm

14.50%
198967.55

Sub- Total

12.50%
171523.75

Table 28
Basic Rate

CED @

Pg.79
ST @

Transport

CP @

5.00%
68609.50

13.615%
196164.85

Total Rs.

DN 700

1372190.0

2007455.65

2007455.65

DN 800

1734934.0

216866.75

251565.43

86746.70

248021.83

2538134.71

2538134.71

DN 900

1961180.0

245147.50

284371.10

98059.00

280365.39

2869122.99

2869122.99

DN 1000

2197338.0

274667.25

318614.01

109866.90

314125.95

3214612.11

3214612.11

DN 1100

3403190.0

425398.75

493462.55

170159.50

486511.53

4978722.33

4978722.33

DN 1200

2994069.0

374258.63

434140.01

149703.45

428024.62

4380195.71

4380195.71

14

14.50%
198967.55

Sub- Total

12.50%
171523.75

PHE-CISV-15- Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel & Reflex valves) excluding cost of bolts,
nuts, rubber insertion, sluice valve and tail pieces.
Rates vide PH Data ( CSSR Sl.No16, Pg.228 of SSR)
Dia in mm

Unit
Each
Each

Rate as per PH
data
99.07
131.56

a
b

80 mm
100 mm

Total
99.07
131.56

150 mm

Each

222.96

222.96

200 mm

Each

367.84

367.84

250 mm

Each

522.74

522.74

300 mm

Each

744.23

744.23

350 mm

Each

1256.85

1256.85

400 mm

Each

1543.14

1543.14

450 mm

Each

2017.95

2017.95

500 mm

Each

2339.14

2339.14

k
15

600 mm

Each

3973.05

3973.05

PHE-JCIF-5 : Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white
lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Reference to specifications. BIS
No.3114/1994.)
Rates up to 750mm dia valves as per PH data sheet and above 750mm dia vide Sl.No.10, Pg.3 of PH SSR (PH items)

Dia in mm

Unit

Basic Rate as
per PH data

MA @

337269598.xlsx Valves

CP @

Total

Dia in mm

Unit

Page 226 of 3205

Basic Rate as
per PH data

Total
20%

13.615%

80 mm

Each Joint

184.90

184.90

100 mm

Each Joint

308.30

308.30

150 mm

Each Joint

492.59

492.59

200 mm

Each Joint

538.99

538.99

250 mm

Each Joint

781.89

781.89

300 mm

Each Joint

820.42

820.42

350 mm

Each Joint

1183.95

1183.95

400 mm

Each Joint

1888.73

1888.73

i
j

450 mm

Each Joint

2203.03

2203.03

500 mm

Each Joint

2557.39

2557.39

600 mm

Each Joint

3564.98

3564.98

700 mm

Each Joint

4542.86

4542.86

750 mm

Each Joint

4881.15

800 mm

Each Joint

6389.00

1277.80

1043.83

8710.63

900 mm

Each Joint

7514.00

1502.80

1227.64

10244.44

1000 mm

Each Joint

8653.00

1730.60

1413.73

11797.33

q
r
16

1100 mm

Each Joint

9821.00

1964.20

1604.55

13389.75

4881.15

1200 mm
Each Joint
11030.00
2206.00
1802.08
15038.08
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials
such as bolts, nuts and rubber insertions etc., complete.
Rates vide CSSR Sl.No18, Pg.43 of PH items
Dia in mm

a
b
c
d
e
f
g

40 mm
50 mm
65 mm
80 mm
100 mm
125 mm
150 mm

Unit
Each
Each
Each
Each
Each
Each
Each

Basic Rate

MA @

CP @

20%

13.615%

177.00
188.00
201.00
220.00
256.00
400.00
438.00

35.40
37.60
40.20
44.00
51.20
80.00
87.60

Total

28.92
30.72
32.84
35.94
41.83
65.35
71.56

241.32
256.32
274.04
299.94
349.03
545.35
597.16

BULK FLOW METERS


17

Manufacture, supply and commission Electromagnetic Flow Meter (EMF), for Raw/Pure water with accuracy 0.5% of measured value &
protection as per given specifications for size 100 mm-1000mm Including sensor, transmitter surge arrestor, cable GI duct if suitable size for 25
mtrs. sensor, transmitter surge arrestor, 25 Mtrs / each flow meter, including the pipe cutting, leveling and installation of flow meter in the
pipelines with necessary tool tackles, cranes etc., as may be required at site & based on technical specifications with the fallowing Mandatory
Accessories:
1) The sensor should be as per IP-68 protection & with flanges of up to PN 10 rating from CS-1 No.
2) The sensor coil housing shall be IP-68.This protected against external magnetic field.
3) The transmitter shall have one current 4 m A-20 mA output.
4) The current output shall be galvanically / optically isolated. It shall be fitted with switched mode power supply capability 85- 260 V & 45-65 Hz
to cope with power transients without damage.
5) Signal & power cables shall be of 50 Mtrs length/each.
6) Conduit pipe ( PVC Plumbing schedule 4 ) 25 mm diameter with suitable rating of cable with digging, laying & concealed the duct - 25
mtrs/each.
7) UPS working on 230 V AC, 50 Hz power supply suitable for 12 hrs continuous operation-1 No.
8) Data storage capacity with built in or separate for date time, actual flow rate, totaliser & error messages if any with storage capacity of 120
days at 1 hour interval data logging-1 No.
9) 21",80 column Dot matrix printer of EPSON, WIPRO, or Hewlett Packard make with printer interface unit for printing of stored data as per 8 )1 No.
10) Proper earthing shall be provided for protection against high voltage surge.
11) Suitable over voltage protection unit for protection of instrument from higher voltage (upto 275 V-300 V AC)

Dia in mm

Basic Rate as
per Maharastra
SSR

CED @

ST @

0.00%
a
b
c
d
e
f
g
h
i
j
k
l
m
n

100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm

153284
164445
195590
215737
246764
342656
388915
415530
485460
559890
601560
722880
823680
882280

Transport @

0.00%
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Add chamber
@

0%
0
0
0
0
0
0
0
0
0
0
0
0
0
0

337269598.xlsx Valves

0
0
0
0
0
0
0
0
0
0
0
0
0
0

7500
7500
7500
10000
10000
10000
15000
15000
15000
20000
20000
25000
25000
25000

CP @
13.615%
21891
23410
27651
30734
34958
48014
54993
58617
68138
78952
84625
101824
115548
123526

Total Rs.

182675.00
195355.00
230741.00
256471.00
291722.00
400670.00
458908.00
489147.00
568598.00
658842.00
706185.00
849704.00
964228.00
1030806.00

Page 227 of 3205

Table. 24. COST OF DI SPECIALS


20/02/16

Centrifugally cast (spun) Ductile Iron fittings conforming to IS:9523/2000 having dimentions as per table. the rate
are for fittings, Zinc coated externally with inside mortar lining (with finishing as per class 13/ IS 9523/200
transportation, taxes and duties etc.
Rate as per Table 23, Page No.67 & 68 of the PH SSR

S.No

Description of Item

Basic Rate

CED @

Add ST @

Transport
@

12.50%

5%

5%

DI double socket branch flange Tee

Up to 500mm dia

111.00

13.88

6.24

5.55

Above 500mm dia

124.00

15.50

6.98

6.20

II

DI All Socket Tees

Up to 300 x 300mm dia

111.00

13.88

6.24

5.55

Above 300 x 300mm dia

124.00

15.50

6.98

6.20

III

DI Double socket Tapers (Reducer)

Up to 500 x 450mm dia

111.00

13.88

6.24

5.55

Above 500 x 450mm dia

124.00

15.50

6.98

6.20

IV

DI Flanged Socket

Up to 500mm dia

111.00

13.88

6.24

5.55

Above 500mm dia

124.00

15.50

6.98

6.20

DI Flanged Spigot

Up to 500mm dia

111.00

13.88

6.24

5.55

Above 500mm dia

124.00

15.50

6.98

6.20

VI

DI Double Socket Duck Foot Bend

Up to 300mm dia

111.00

13.88

6.24

5.55

Above 300mm dia

124.00

15.50

6.98

6.20

VII

DI Double Flange Duck/Foot bend

Up to 300mm dia

111.00

13.88

6.24

5.55

Above 300mm dia

124.00

15.50

6.98

6.20

VIII

DI All socket Cross.

Up to 300 x 300mm dia

111.00

13.88

6.24

5.55

Above 300 x 300mm dia

124.00

15.50

6.98

6.20

IX

DI All Flange Tee


Upto 500 x 500 mm dia

111.00

13.88

6.24

5.55

Above 500 x 500 mm dia

124.00

15.50

6.98

6.20

Up to 300 x 300mm dia

111.00

13.88

6.24

5.55

Above 300 x 300mm dia

124.00

15.50

6.98

6.20

DI All Flange Cross

337269598.xlsx -DI& CI-Spe-1

Page 228 of 3205

XI

XII

XIII

XIV

XV

DI Double Flange Reducer

Up to 500 x 450mm dia

111.00

13.88

6.24

5.55

Above 500 x 450mm dia

124.00

15.50

6.98

6.20

Up to 500mm dia

111.00

13.88

6.24

5.55

Above 500mm dia

124.00

15.50

6.98

6.20

Up to 300mm dia

111.00

13.88

6.24

5.55

Above 300mm dia

124.00

15.50

6.98

6.20

Up to 500mm dia

111.00

13.88

6.24

5.55

Above 500mm dia

124.00

15.50

6.98

6.20

Up to 500mm dia

111.00

13.88

6.24

5.55

Above 500mm dia

124.00

15.50

6.98

6.20

Blank Flange

Mechanical Joints

DI Double Socket Bends

DI Double Flanged Bends

COST OF CI SPECIALS
20/02/16

Manufacture, supply and delivery of Cast Iron pipes and fittings (spls.) conforming to IS. No. 7181/1986,
and CID. joints confirming to IS No.8794/1988 at site of work anywhere in A.P.including, loading, unloa
site of work stacking at site transit risk and package, including taxes and duties.
Rate as per Table 25, Page No.70 of the PH SSR
Pig Iron
As per SSR
as per Cement and Steel Rates as finalized by the
sub-committee for the Month of 20/02/16
Difference
Increase for every Rs.1000/MT as per SSR
There fore

3.43 %
-6.50

3.43 %
or

Hence add the difference to the basic rate


Coke
As per SSR
as per Cement and Steel Rates as finalized by the
sub-committee for the Month of 20/02/16
Difference
Increase for every Rs.1000/MT
There fore

0.67 %
0.00

Hence add the difference to the basic rate


Rate per One Kg
Add CED @
Add ST @

12.50%
14.50%

337269598.xlsx -DI& CI-Spe-1

0.67 %
or

Page 229 of 3205

Rate per One Kg


Add Over heads and Contractors profit @

13.615%

Rate per One Kg


VAT & Labour cess etc,. @

0%

Rate per One Kg

337269598.xlsx -DI& CI-Spe-1

Page 230 of 3205

CIALS

ing dimentions as per table. the rates mentioned here under


hing as per class 13/ IS 9523/2000) ( ex-works) including

CP & over
heads @

Sub Total

Total

Unit

13.615%

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

337269598.xlsx -DI& CI-Spe-1

Page 231 of 3205

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

15.11

151.78

151.78 1 Kg

16.88

169.56

169.56 1 Kg

conforming to IS. No. 7181/1986, 5531/1988, 3950/1979


ere in A.P.including, loading, unloading, transportation to
d duties.
73.70
27500.00
21000.00

-6500.00
-0.22
-22.30%
-16.43
36570.00
36570.00

0.00
0
0%
0.00
57.27
7.16
8.3

337269598.xlsx -DI& CI-Spe-1

Page 232 of 3205

72.73
7.8
80.53
0.00
Rs.

80.53 1 Kg

337269598.xlsx -DI& CI-Spe-1

Page 233 of 3205

Kandukur Municipality
Data - ELSR
Construction of 1400 KL RCC ELSR in Zone.IV, Palakonda Nagar Panchayat
RATE ANALYSIS FOR ELSRs
As per
Cost of Steel
As per Market
As per SSR
Difference

0.00002
-0.250

0.00007
0.122

Wind pressure in Kg/Sqm


SBC in T/ Sqm
Sesmic Zone

350
15
Zone-II

Actual
200
30
Zone-II

Rate per Staging of Less than 15 m

-0.05

Rate per Staging above 15 m


CP & OH

0.1
13.615%

-8%

-6%
0

-1.228

0.00

17.669

13.615%
2.406

20.075

0%
0.000

20.075

1000 KL
1500 KL

15 Mts
15 Mts

20.46
16.91

20.332
16.782

16
16

1
1

0.10
0.10

20.432
16.882

-1.535
-1.268

-1.228
-1.015

0.00
0.00

17.669
14.599

2.406
1.988

20.075
16.587

0.000
0.000

20.075
16.587

2000 KL
2500 KL

15 Mts
15 Mts

15.27
14.27

15.142
14.142

16
16

1
1

0.10
0.10

15.242
14.242

-1.145
-1.070

-0.916
-0.856

0.00
0.00

13.181
12.316

1.795
1.677

14.976
13.993

0.000
0.000

14.976
13.993

10 KL

10 Mts

0.00

-0.128

16

0.60

0.472

0.000

0.000

0.00

0.472

0.064

0.536

0.000

0.536

15 KL
20 KL

10 Mts
10 Mts

65.56
45.09

65.432
44.962

16
16

6
6

0.60
0.60

66.032
45.562

-4.917
-3.382

-3.934
-2.705

0.00
0.00

57.181
39.475

7.785
5.374

64.966
44.849

0.000
0.000

64.966
44.849

40 KL
60 KL
100 KL
200 KL

10 Mts
10 Mts

44.31
39.22

44.182
39.092

16
16

6
6

0.60
0.60

44.782
39.692

-3.323
-2.942

-2.659
-2.353

0.00
0.00

38.800
34.397

5.283
4.683

44.083
39.080

0.000
0.000

44.083
39.080

10 Mts
10 Mts

29.76
27.47

29.632
27.342

16
16

6
6

0.60
0.60

30.232
27.942

-2.232
-2.060

-1.786
-1.648

0.00
0.00

26.214
24.234

3.569
3.299

29.783
27.533

0.000
0.000

29.783
27.533

300 KL
400 KL
450 KL

10 Mts
10 Mts
10 Mts

24.05
22.57
19.90

23.922
22.442
19.772

16
16
16

6
6
6

0.60
0.60
0.60

24.522
23.042
20.372

-1.804
-1.693
-1.493

-1.443
-1.354
-1.194

0.00
0.00
0.00

21.275
19.995
17.685

2.897
2.722
2.408

24.172
22.717
20.093

0.000
0.000
0.000

24.172
22.717
20.093

data-ELSR-

Sub- Total

Cost of the
ELSR

Add VAT @

Sub- Total

Add CP & OH @
13.615%

Sub- Total

Add for Seismic


zone - III @
33.33%

Decrease/
Increase due to
SBC

Decrease due to
less Wind
pressure

Rate with
variation in
staging

Variation in Cost

Variation in
staging

Proposed
Staging of ELSR

Rate with
variation in
Material cost

Staging

RATES FOR ELSRs OF STANDARD & INTERMEDIATE STAGING WITH VARIOUS STAGINGS ( ABOVE 450 KL CAPACITY )
Capacity of
ELSR

Basic Rate per


Liter

Cost of the
ELSR

-1.535

Add VAT @

20.432

Sub- Total

0.10

Add CP & OH
@ 13.615%

Add for
Seismic zone III @ 33.33%

16

Decrease/
Increase due to
SBC

20.332

Decrease due
to less Wind
pressure

20.46

Rate with
variation in
staging

15 Mts

Rate with
variation in
Material cost

500 KL

Basic Rate per


Liter

Staging

STANDARD STAGING
Capacity of
ELSR

Variation in
Cost

5740.00
4000.00
1740.00

Variation in
staging

34000.00
46500.00
-12500.00

SSR

Proposed
Staging of
ELSR

Variation Value
Variation

Cost of Cement

Page 234 of 3205

500
550
600
650

KL
KL
KL
KL

15 Mts
15 Mts
15 Mts

20.460
20.460
20.460

20.332
20.332
20.332

16
16
16

1
1
1

0.10
0.10
0.10

20.432
20.432
20.432

-1.535
-1.535
-1.535

-1.228
-1.228
-1.228

0.00
0.00
0.00

17.669
17.669
17.669

2.406
2.406
2.406

20.075
20.075
20.075

0.000
0.000
0.000

20.075
20.075
20.075

15 Mts

20.460

20.332

16

0.10

20.432

-1.535

-1.228

0.00

17.669

2.406

20.075

0.000

20.075

700 KL
750 KL
800 KL

15 Mts
15 Mts
15 Mts

20.460
20.460
20.460

20.332
20.332
20.332

16
16
16

1
1
1

0.10
0.10
0.10

20.432
20.432
20.432

-1.535
-1.535
-1.535

-1.228
-1.228
-1.228

0.00
0.00
0.00

17.669
17.669
17.669

2.406
2.406
2.406

20.075
20.075
20.075

0.000
0.000
0.000

20.075
20.075
20.075

850 KL
900 KL

15 Mts
15 Mts

20.460
20.460

20.332
20.332

16
16

1
1

0.10
0.10

20.432
20.432

-1.535
-1.535

-1.228
-1.228

0.00
0.00

17.669
17.669

2.406
2.406

20.075
20.075

0.000
0.000

20.075
20.075

950 KL
1000 KL
1000 KL

15 Mts
15 Mts
15 Mts

20.460
20.460
20.460

20.332
20.332
20.332

16
16
16

1
1
1

0.10
0.10
0.10

20.432
20.432
20.432

-1.535
-1.535
-1.535

-1.228
-1.228
-1.228

0.00
0.00
0.00

17.669
17.669
17.669

2.406
2.406
2.406

20.075
20.075
20.075

0.000
0.000
0.000

20.075
20.075
20.075

1000 KL
1050 KL

15 Mts
15 Mts

20.460
20.105

20.332
19.977

16
16

1
1

0.10
0.10

20.432
20.077

-1.535
-1.508

-1.228
-1.206

0.00
0.00

17.669
17.363

2.406
2.364

20.075
19.727

0.000
0.000

20.075
19.727

1100 KL
1150 KL
1200 KL

15 Mts
15 Mts
15 Mts

19.750
19.395
19.040

19.622
19.267
18.912

16
16
16

1
1
1

0.10
0.10
0.10

19.722
19.367
19.012

-1.481
-1.455
-1.428

-1.185
-1.164
-1.142

0.00
0.00
0.00

17.056
16.748
16.442

2.322
2.280
2.239

19.378
19.028
18.681

0.000
0.000
0.000

19.378
19.028
18.681

1250 KL
1300 KL

15 Mts
15 Mts

18.685
18.330

18.557
18.202

16
16

1
1

0.10
0.10

18.657
18.302

-1.401
-1.375

-1.121
-1.100

0.00
0.00

16.135
15.827

2.197
2.155

18.332
17.982

0.000
0.000

18.332
17.982

1350 KL
1400 KL
1450 KL

15 Mts
15 Mts
15 Mts

17.975
17.620
17.265

17.847
17.492
17.137

16
16
16

1
1
1

0.10
0.10
0.10

17.947
17.592
17.237

-1.348
-1.322
-1.295

-1.079
-1.057
-1.036

0.00
0.00
0.00

15.520
15.213
14.906

2.113
2.071
2.029

17.633
17.284
16.935

0.000
0.000
0.000

17.633
17.284
16.935

1500 KL
1550 KL

15 Mts
15 Mts

16.910
16.746

16.782
16.618

16
16

1
1

0.10
0.10

16.882
16.718

-1.268
-1.256

-1.015
-1.005

0.00
0.00

14.599
14.457

1.988
1.968

16.587
16.425

0.000
0.000

16.587
16.425

1600 KL
1650 KL
1700 KL

15 Mts
15 Mts
15 Mts

16.582
16.418
16.254

16.454
16.290
16.126

16
16
16

1
1
1

0.10
0.10
0.10

16.554
16.390
16.226

-1.244
-1.231
-1.219

-0.995
-0.985
-0.975

0.00
0.00
0.00

14.315
14.174
14.032

1.949
1.930
1.910

16.264
16.104
15.942

0.000
0.000
0.000

16.264
16.104
15.942

1750 KL
1800 KL

15 Mts
15 Mts

16.090
15.926

15.962
15.798

16
16

1
1

0.10
0.10

16.062
15.898

-1.207
-1.194

-0.965
-0.956

0.00
0.00

13.890
13.748

1.891
1.872

15.781
15.620

0.000
0.000

15.781
15.620

1850
1900
1950
2000

KL
KL
KL
KL

15 Mts
15 Mts

15.762
15.598

15.634
15.470

16
16

1
1

0.10
0.10

15.734
15.570

-1.182
-1.170

-0.946
-0.936

0.00
0.00

13.606
13.464

1.852
1.833

15.458
15.297

0.000
0.000

15.458
15.297

15 Mts
15 Mts

15.434
15.270

15.306
15.142

16
16

1
1

0.10
0.10

15.406
15.242

-1.158
-1.145

-0.926
-0.916

0.00
0.00

13.322
13.181

1.814
1.795

15.136
14.976

0.000
0.000

15.136
14.976

2050 KL
2100 KL
2150 KL

15 Mts
15 Mts
15 Mts

15.170
15.070
14.970

15.042
14.942
14.842

16
16
16

1
1
1

0.10
0.10
0.10

15.142
15.042
14.942

-1.138
-1.130
-1.123

-0.910
-0.904
-0.898

0.00
0.00
0.00

13.094
13.008
12.921

1.783
1.771
1.759

14.877
14.779
14.680

0.000
0.000
0.000

14.877
14.779
14.680

2200 KL
2250 KL

15 Mts
15 Mts

14.870
14.770

14.742
14.642

16
16

1
1

0.10
0.10

14.842
14.742

-1.115
-1.108

-0.892
-0.886

0.00
0.00

12.835
12.748

1.747
1.736

14.582
14.484

0.000
0.000

14.582
14.484

2300
2350
2400
2450

KL
KL
KL
KL

15 Mts
15 Mts
15 Mts
15 Mts

14.670
14.570
14.470
14.370

14.542
14.442
14.342
14.242

16
16
16
16

1
1
1
1

0.10
0.10
0.10
0.10

14.642
14.542
14.442
14.342

-1.100
-1.093
-1.085
-1.078

-0.880
-0.874
-0.868
-0.862

0.00
0.00
0.00
0.00

12.662
12.575
12.489
12.402

1.724
1.712
1.700
1.689

14.386
14.287
14.189
14.091

0.000
0.000
0.000
0.000

14.386
14.287
14.189
14.091

2500 KL
2500 KL

15 Mts
15 Mts

14.27
14.27

14.142
14.142

16
16

1
1

0.10
0.10

14.242
14.242

-1.070
-1.070

-0.856
-0.856

0.00
0.00

12.316
12.316

1.677
1.677

13.993
13.993

0.000
0.000

13.993
13.993

data-ELSR-

Page 235 of 3205

Add CP & OH
@ 13.615%

Add for
Seismic zone
- III @ 33.33%

Decrease/
Increase due
to SBC

0.472
66.032
45.562

0.000
-4.917
-3.382

0.000
-3.934
-2.705

0.00
0.00
0.00

0.472
57.181
39.475

0.064
7.785
5.374

0.536
64.966
44.849

0.000
0.000
0.000

0.536
64.966
44.849

25 KL
30 KL

10 Mts
10 Mts

44.895
44.700

44.767
44.572

16
16

6
6

0.60
0.60

45.367
45.172

-3.367
-3.353

-2.694
-2.682

0.00
0.00

39.306
39.137

5.351
5.328

44.657
44.465

0.000
0.000

44.657
44.465

35 KL
40 KL
45 KL

10 Mts
10 Mts
10 Mts

44.505
44.31
43.037

44.377
44.182
42.909

16
16
16

6
6
6

0.60
0.60
0.60

44.977
44.782
43.509

-3.338
-3.323
-3.228

-2.670
-2.659
-2.582

0.00
0.00
0.00

38.969
38.800
37.699

5.306
5.283
5.133

44.275
44.083
42.832

0.000
0.000
0.000

44.275
44.083
42.832

50 KL
55 KL

10 Mts
10 Mts

41.765
40.492

41.637
40.364

16
16

6
6

0.60
0.60

42.237
40.964

-3.132
-3.037

-2.506
-2.430

0.00
0.00

36.599
35.497

4.983
4.833

41.582
40.330

0.000
0.000

41.582
40.330

60 KL
70 KL
75 KL

10 Mts
10 Mts
10 Mts

39.22
36.855
35.672

39.092
36.727
35.544

16
16
16

6
6
6

0.60
0.60
0.60

39.692
37.327
36.144

-2.942
-2.764
-2.675

-2.353
-2.211
-2.140

0.00
0.00
0.00

34.397
32.352
31.329

4.683
4.405
4.265

39.080
36.757
35.594

0.000
0.000
0.000

39.080
36.757
35.594

80 KL
90 KL

10 Mts
10 Mts

34.490
32.125

34.362
31.997

16
16

6
6

0.60
0.60

34.962
32.597

-2.587
-2.409

-2.069
-1.928

0.00
0.00

30.306
28.260

4.126
3.848

34.432
32.108

0.000
0.000

34.432
32.108

100 KL
100 KL
100 KL

10 Mts
10 Mts
10 Mts

29.76
29.76
29.76

29.632
29.632
29.632

16
16
16

6
6
6

0.60
0.60
0.60

30.232
30.232
30.232

-2.232
-2.232
-2.232

-1.786
-1.786
-1.786

0.00
0.00
0.00

26.214
26.214
26.214

3.569
3.569
3.569

29.783
29.783
29.783

0.000
0.000
0.000

29.783
29.783
29.783

110 KL
120 KL

10 Mts
10 Mts

29.531
29.302

29.403
29.174

16
16

6
6

0.60
0.60

30.003
29.774

-2.215
-2.198

-1.772
-1.758

0.00
0.00

26.016
25.818

3.542
3.515

29.558
29.333

0.000
0.000

29.558
29.333

120 KL
125 KL
130 KL

10 Mts
10 Mts
10 Mts
10 Mts

29.302
29.187
29.073
28.844

29.174
29.059
28.945
28.716

16
16
16
16

6
6
6
6

0.60
0.60
0.60
0.60

29.774
29.659
29.545
29.316

-2.198
-2.189
-2.180
-2.163

-1.758
-1.751
-1.744
-1.731

0.00
0.00
0.00
0.00

25.818
25.719
25.621
25.422

3.515
3.502
3.488
3.461

29.333
29.221
29.109
28.883

0.000
0.000
0.000
0.000

29.333
29.221
29.109
28.883

10 Mts
10 Mts
10 Mts

28.615
28.386
28.157

28.487
28.258
28.029

16
16
16

6
6
6

0.60
0.60
0.60

29.087
28.858
28.629

-2.146
-2.129
-2.112

-1.717
-1.703
-1.689

0.00
0.00
0.00

25.224
25.026
24.828

3.434
3.407
3.380

28.658
28.433
28.208

0.000
0.000
0.000

28.658
28.433
28.208

175 KL
180 KL

10 Mts
10 Mts

28.042
27.928

27.914
27.800

16
16

6
6

0.60
0.60

28.514
28.400

-2.103
-2.095

-1.683
-1.676

0.00
0.00

24.728
24.629

3.367
3.353

28.095
27.982

0.000
0.000

28.095
27.982

180
190
200
225

KL
KL
KL
KL

10 Mts
10 Mts
10 Mts
10 Mts

27.928
27.699
27.47
26.615

27.800
27.571
27.342
26.487

16
16
16
16

6
6
6
6

0.60
0.60
0.60
0.60

28.400
28.171
27.942
27.087

-2.095
-2.077
-2.060
-1.996

-1.676
-1.662
-1.648
-1.597

0.00
0.00
0.00
0.00

24.629
24.432
24.234
23.494

3.353
3.326
3.299
3.199

27.982
27.758
27.533
26.693

0.000
0.000
0.000
0.000

27.982
27.758
27.533
26.693

250 KL
275 KL

10 Mts
10 Mts

25.760
24.905

25.632
24.777

16
16

6
6

0.60
0.60

26.232
25.377

-1.932
-1.868

-1.546
-1.494

0.00
0.00

22.754
22.015

3.098
2.997

25.852
25.012

0.000
0.000

25.852
25.012

140
150
160
170

KL
KL
KL
KL

data-ELSR-

Cost of the
ELSR

0.60
0.60
0.60

6
6
6

Sub- Total

16
16
16

Sub- Total

Variation in
Cost

Decrease due
to less Wind
pressure

Variation in
staging

-0.128
65.432
44.962

Rate with
variation in
staging

Proposed
Staging of
ELSR

0.00
65.56
45.09

Basic Rate
per Liter

10 Mts
10 Mts
10 Mts

Staging

10 KL
15 KL
20 KL

Capacity of
ELSR
b

Rate with
variation in
Material cost

RATES FOR ELSRs OF STANDARD & INTERMEDIATE STAGING WITH VARIOUS STAGINGS ( UP TO 450 KL CAPACITY )

Page 236 of 3205

300
325
350
375

KL
KL
KL
KL

10 Mts
10 Mts
10 Mts

24.05
23.680
23.310

23.922
23.552
23.182

16
16
16

6
6
6

0.60
0.60
0.60

24.522
24.152
23.782

-1.804
-1.776
-1.748

-1.443
-1.421
-1.399

0.00
0.00
0.00

21.275
20.955
20.635

2.897
2.853
2.809

24.172
23.808
23.444

0.000
0.000
0.000

24.172
23.808
23.444

10 Mts

22.940

22.812

16

0.60

23.412

-1.721

-1.376

0.00

20.315

2.766

23.081

0.000

23.081

400 KL
400 KL
425 KL

10 Mts
10 Mts
10 Mts

22.57
22.57
21.235

22.442
22.442
21.107

16
16
16

6
6
6

0.60
0.60
0.60

23.042
23.042
21.707

-1.693
-1.693
-1.593

-1.354
-1.354
-1.274

0.00
0.00
0.00

19.995
19.995
18.840

2.722
2.722
2.565

22.717
22.717
21.405

0.000
0.000
0.000

22.717
22.717
21.405

450 KL

10 Mts

19.90

19.772

16

0.60

20.372

-1.493

-1.194

0.00

17.685

2.408

20.093

0.000

20.093

data-ELSR-

Page 237 of 3205


II
(i)

d
e

WBM Grading 2
WBM Grading 2 : Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper
grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density grading 2 as per Technical Specification Clause 405 MORD / 404 MORTH. For compacted
thickness of 75 mm. With stone screening / binding materials
By Manual Means
Unit = cum
Taking output = 360 cum
a)Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
Add Municipal Allowance @
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural Area works
(OR)
Three wheel 80-100 kN static roller @ 30 cum per hour for R&B & Urban
Works
(OR)
Vibratory roller 8-10 tonnes @ 60 cum per hour
Water tanker 6 kl capacity
c) Material (Refer Tables 400.7, 8, 9 and 10 MORD/ 400.6, 7, 8 & 9
MORTH)
Aggregate
Grading 2 - 63 mm to 45 mm @ 0.91 cum per 10 sqm for compacted
thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 / 0.20 cum/10sqm
(OR)
Type B 13.2 mm for Grading 2 @ 0.12 cum per 10sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 material
Water

Using 11.2 mm for Gr- 2 : (with 3 Wheel Roller)-Rural


Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
c&d) Overheads & Contractors Profit
Sub-Total
Rate per cum = (a+b+c+d+e)/360
VAT & labour cess .
Rate per 1 Cum

360 Cum
day
day
day

12.08
250.00
20%

375.00
375.00
320.00

hour

36.00

1101.00

39636.00

hour

12.00

1101.00

13212.00

hour
hour

6.00
24.00

2609.10
865.50

15654.60
20772.00

cum

435.60

1279.81

557485.24

cum

86.40

1741.81

150492.38

cum

57.60

2009.81

115765.06

cum

28.80

306.76

8834.69

kl

144.00

103.00

14832.00
1038119.97

13.615%

0%
A

4530.00
80000.00
16906.00

858760.99
116920.31
975681.30
2710.23
0.00
2710.23

Page 238 of 3205


COST OF GENERATOR SETS BASED ON - 2014-15 SSR (10.1)
S.No

SSR item

Description

Basic cost

OH & CP
13.615%

I
ELEC-10.1.1

SSR Items
15 KVA, 3 Phase, 415, 50Hz, 19BHP, water cooled multi cylinder diesel generator set with alternator of 15 KVA
out put continous rating at 0.8 p.f, Batteries .

ELEC-10.1.2

385875.00

52537.00

30 KVA, 3 Phase, 415, 50Hz, 40 to 42 BHP, water cooled multi cylinder diesel generator set with alternator of
30KVA out put continous rating at 0.8 p.f, Batteries.

496125.00

67547.00

ELEC-10.1.3

40 KVA, 3 Phase, 415, 50Hz, 56BHP, water cooled multi cylinder diesel generator set with alternator of 40 KVA
out put continous rating at 0.8 p.f, and Batteries .

617400.00

84059.00

ELEC-10.1.4

63 KVA, 3 Phase, 415, 50Hz, 78 to 83BHP, water cooled multi cylinder diesel generator set with alternator of
63KVA out put continous rating at 0.8 p.f, and Batteries .

771750.00

105074.00

ELEC-10.1.5

125 KVA, 3 Phase, 415, 50Hz, 154BHP, water cooled multicylinder diesel generator set with alternator of 125
KVA out put continous rating at 0.8 p.f, and Batteries .

1047375.00

142600.00

ELEC-10.1.6

160 KVA, 3 Phase, 415, 50Hz, 200BHP, water cooled multi cylinder diesel generator set with alternator of 160
KVA out put continous rating at 0.8 p.f, and Batteries.

1433250.00

195137.00

ELEC-10.1.7

250 KVA, 3 Phase, 415, 50Hz, 310BHP, water cooled multi cylinder diesel generator set with alternator of 250
KVA out put continous rating at 0.8 p.f, and Batteries

2205000.00

300211.00

ELEC-10.1.8

320 KVA, 3 Phase, 415, 50Hz, 380BHP, water cooled multi cylinder diesel generator set with alternator of 320
KVA out put continous rating at 0.8 p.f, and Batteries

2866500.00

390274.00

All the items to be used on work are of first quality & ISI and as approved by the Engineer In charge of the work.

Supply Rates for all the materials are based on market rates plus Sales Tax/ Material VAT.

Works Contract VAT for General/ Composition Scheme on finished items may be allowed as applicable.

SOR Rates for Building items are purely for guidance for the officers for preparation of estimates vide para.113 of APPWD code. Authority who prepares the
for proper rates as envisaged in para.45 of APPWD code.

Page 239 of 3205

II
as per quotation

Non SSR Items


400 KVA, 3 Phase, 415, 50Hz, 460 BHP, water cooled multi cylinder diesel generator set with alternator of 400
KVA out put continous rating at 0.8 p.f, Batteries .

as per quotation

4070968.00

554262.00

430 KVA, 3 Phase, 415, 50Hz, 460 BHP, water cooled multi cylinder diesel generator set with alternator of 400
KVA out put continous rating at 0.8 p.f, Batteries .

4376290.00

595832.00

as per quotation

500 KVA, 3 Phase, 415, 50Hz, 560 BHP, water cooled multi cylinder diesel generator set with alternator of 500
KVA out put continous rating at 0.8 p.f, Batteries.

5088709.00

692828.00

as per quotation

630 KVA, 3 Phase, 415, 50Hz, 560 BHP, water cooled multi cylinder diesel generator set with alternator of 500
KVA out put continous rating at 0.8 p.f, Batteries.

6411774.00

872963.00

as per quotation

1100 KVA, 3 Phase, 415, 50Hz, 560 BHP, water cooled multi cylinder diesel generator set with alternator of 1100
KVA out put continous rating at 0.8 p.f, Batteries.

10471780.00

1425733.00

Page 240 of 3205

Sub-Total

Mandatory
provisions

Total Rs.

Unit

438412.00

0.00

438412.00 Each

563672.00

0.00

563672.00 Each

701459.00

0.00

701459.00 Each

876824.00

0.00

876824.00 Each

1189975.00

0.00

1189975.00 Each

1628387.00

0.00

1628387.00 Each

2505211.00

0.00

2505211.00 Each

3256774.00

0.00

3256774.00 Each

res the estimate is however responsible

Page 241 of 3205

4625230.00

4625230.00 Each

4972122.00

4972122.00 Each

5781537.00

5781537.00 Each

7284737.00

7284737.00 Each

11897513.00

11897513.00 Each

Page 242 of 3205


COST BASED ON SSR 2015-16
S.No

SSR item

Description

Supply, transportation and delivery at site of 3 Phase, 50 Hz, oil immersed and naturally cooled, outdoor / Indoor type
copper wound transformer designed and manufactured as per IS 2026-1977 and 1st filling of oil as per IS 335 of 1993,
connected delta on primary side and Star on secondary side with additional neutral brought out on load side, 1100V /
(433V / 415V) with HV tapping + or - 2.5% contineously rated for full load and temporature rise not exceeding 50C in oil
and 55C rise by th resistance of the winding after contineous run on full load rating complete with the following standard
mountings. Makes: Kirloskar / PETE / Esennar / Servomax
(Note:Other than these makes / brands mentioned rate may be allowed as approved by AP Electricity Board).

Basic cost

Page 243 of 3205

S.No

SSR item

Description

Basic cost

1. Rated KVA : ........KVA


2. Service: Outdoor / Indoor
3. Mounting : Plinth.
4. Copper wound : Double.
5. Type : Core.
6. Cooling : ONAN
7. Temp . Rise : 55C.
8. Vector Group: Dyn 11
9. Primary Connection : Delta
10. Primary Volts : 11000
11. Primry Frequency : 50
12.Primary Phases : 3
13. Primary wires: 3
14. Secondary connection : Star
15. Secondary Volts : 415 / 433V
16. Secondary phases : 3
17. Secondary wires: 4
18. Taps on primary winding for primary voltage variation : +7.5% to - 7.5% in steps of 2.5%,
19. Terminal arrangement. a. HV: Bare Busings / Cable end box b. LV : Cable box
20. LV : One separate terminal for earthing.
21. Impedance(Z%) : .............As per IS specification
22. Fittings & Accessories. a. Rating and terminal marking plate b. Earthing terminals c. Lifting Lugs d. Conservator with
drain plug. e. Oil level Indicator f. Dehydrating silicagel breather g. Air release device h. Drain cum filter wall i. Explosion
vent with diaphragm j. Radiators (Attachable) k. Seperate neutral bushing l. Uni directional flat rollers.

Power Transformer 33000 / 433 Volt and other Specification as per TR-1 - With off load Tap Changer -12.5% to
+2.5% in steps of 2.5%
ELEC-6.4.34
ELEC-6.4.35
ELEC-6.4.36
ELEC-6.4.37
ELEC-6.4.38
ELEC-6.4.39

63 KVA,
100 KVA
160 KVA
250 KVA
315 KVA
500 KVA

165000.00
193500.00
295000.00
333125.00
384375.00
536250.00

Page 244 of 3205

BASED ON SSR 2015-16


Labour
charges for
fixing

OH & CP
Sub-Total

13.615%

Total Rs ./ Each

Unit

Page 245 of 3205


Labour
charges for
fixing

0.00
0.00
0.00
0.00
0.00
0.00

OH & CP
Sub-Total

165000.00
193500.00
295000.00
333125.00
384375.00
536250.00

13.615%

22465.00
26345.00
40164.00
45355.00
52333.00
73010.00

Total Rs ./ Each

187465.00
219845.00
335164.00
378480.00
436708.00
609260.00

Unit

Page 246 of 3205

KANDUKUR MUNICIPALITY
Construction Of Mutton Market
DETAILED & ABSTRACT ESTIMATION
S.N.
1

Description

MEASUREMENTS

Nos.

170.85

Rate

Per

Amount

0.60

0.70

71.76
71.76 Cum

BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour charges such as
shoring ,sheeting, planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
% of Total Qty
BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing on bank for all lifts
and with an initial lead of 10m including all operational, incidental, labour charges such as
shoring ,sheeting, planking, strutting, etc. complete for finished item of work including
seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

80%

58.00 Cum

258.06

1 Cum

14967.00

20% of Total Qty


BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop (Cement
: fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc.,
to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for
finished item of work.for foundation and under flooring bed.

20%

15.00 Cum

258.06

1 Cum

3871.00

for Compound Wall

170.85

10.25
10.25 Cum

4409.17

1 Cum

45194.00

23.06
15.38
38.44 Cum

3659.31

1 Cum

140664.00

0.60

0.10

BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard


granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite
Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to
required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing
etc., complete for finished item of Work .
For Foundations below GL
for Compound wall first footing
for Compound wall second footing

Quantity

Compound Wall
Compound Wall around the Proposed structures
Total Length of Compound wall

1
1

x
x

1
1

170.85
170.85

0.45
0.30

0.30
0.30

BLD-CSTN-6-6-(61) ; Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop
using hard granite stone including cost & Conveyance of all materials like Cement, Sand ,
Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for
cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding
Charges curing etc., complete for finished item of Work .
for Compound Wall excluding gate

170.85

337269598.xlsx-KANDUKUR MARKET COMPOUND WALL

0.30

0.30

15.38

246

Page 247 of 3205

S.N.

Description

BLD-CSTN-5-4-(42) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7
Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand,
Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour
charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc.,
complete for finished item of work

MEASUREMENTS

Nos.

Quantity

Net Qty

for Compound Wall excluding gate


for Brick Pillars at every 3.00m c/c
Deduction for Brick Pillars
7

1
1
-1

1
1
1

0.23
0.30
0.30

170.85
170.85
0.35

0.45
0.23
0.35

1.50
1.50
1.50

4197.87

1 Cum

64563.00

58.94
8.51
-6.52
60.93 Cum

4267.28

1 Cum

260005.00

x
x
x

1
1
63

0.075
0.075
0.40

5.77
2.95
3.09
11.81 Cum

6246.37

1 Cum

73770.00

1 Sqm

8409.00

10 Sqm

66759.00

10 Sqm

19693.00

Bld up to 3F
S.No 32

170.85

0.30

102.51
102.51 Sqm

BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth
including cost and conveyance of all materials to site, seigniorage charges on all materials,
finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting
grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10
Sqm.
Both sides of Compound wall ( including DPC )
for exposed faces of the Brick pillars

10

170.85
0.30
0.23
Net Qty

Amount

15.38 Cum

BLD-CSTN-7-3-(74): Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3 )


Prop . for including cost & conveyance of all materials to site , seignaiorage charges on all
materials, labour charges on all materials, curing etc., Complete for finished item of work
Both sides of CRS walls

1
63
63

Per

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using
20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work with nomonal
reinforcement

Over CRS Walls, Brick Wall and Brick Pillars


over CRS wall
over Compound wall
for Pillars
8

x
x
x

Rate

82.03

Bld up to 3F
S.No 34

1
4

x
x

2
63

170.85
0.03

1.65
1.65

563.81
14.55
578.36 Sqm

BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance
charges of materials
Qty as per Plastering area

Bld up to 3F
S.No 56

578.36 Sqm

337269598.xlsx-KANDUKUR MARKET COMPOUND WALL

1154.28

340.49

247

Page 248 of 3205

S.N.

Description

11

BLD-CSTN-11-8-(164) : Colour washing two coats with approved Colour and quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance
charges of materials

12

Quantity

Rate

Per

Amount

Bld up to 3F
S.No 57

Qty as per Raised Pointing


Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos
35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m
height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4
Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to
original surface neatly and painting gate with one coat of red oxide primer including cost and
conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending,
welding including all operational charges and all labour charges etc., complete for finished item
of work.

2 Wings of 75.00 Kg Each


MS Grills for drain out water- 3 Nos for compound wall @ 20 Kg/each
13

MEASUREMENTS

Nos.

102.51 Sqm

2
5
1

x
x
x

2
1
1

75.00 Kg
20.00

300.00
100.00
400.00 Kg

695.34

10 Sqm

7128.00

80.00

1 Kg

32000.00

1 Nos

15000.00

1 Nos
Rs.

10000.00
762023.00

Say Rs.

7.62 Lakhs

Supply and fixing of Display/Name boards of required size where ever necessary made of MS
sheet fixed on MS angles of size 25x25x5mm and the board shall be painted with cannary
yellow in Two coats over a primary coat and all remaining exposed surface shall be painted
black, the letters, boarders and arrows will be painted with Luminous paint and the size of the
letter shall be minimum 15 Cm high and 19mm to 25mm wide and the board shall be fitted to
50x50x10 MS angle posts and firmly fixed in ground in CC(1:3:6) using 40mm size metal in a
block of size 30 x 30 x 90 Cm etc as directed by the Engineer in charge etc.complete.

Name Boards of Size 1.60m x 1.00m

2 Nos

as per
Quotation
7500.00

Name Boards of Size 1.20m x 0.90m


Total Rs.

2 Nos

5000.00

Total Rs.

337269598.xlsx-KANDUKUR MARKET COMPOUND WALL

762023.00

248

Page 249 of 3205

LABOUR RATES (2014-15) - IRRIGATION

SNo.

Basic Rate of
Labour wide Pg.

CATEGORY OF WORKER

5 to 9
I.
1

SKILLED CATEGORY:
Bar bender

2
3

Black smith / Tin smith / Rivetor


Blaster

4
5

Carpenter Cl- I
Electrician ( Licensed )

6
7

Fitter Cl- I
Floor Polisher / Tile Layer

8
9

Foreman
Gauge reader

10

Maistry / Work Inspector with Non-technical Qualification SSLC/SSC/HSC

11

Mason Cl- I / Brick layer Cl- I

12
13

Mechanic Cl- I
Operator Air compressor / DG set

14
15

Operator Batching plant


Operator Bus/Ambulance/ Lorry/ Tanker

16
17

Operator Concrete / Asphalt mixer


Operator Concrete / Asphalt paver

18
19

Operator Concrete pump / Placer/ ice plant


Operator Core drilling machine

20
21

Operator Crane/ Tower crane/ Cable way


Operator Drilling jumbo / Loco / Winch

22
23
24

Operator Grouting/ Guniting/ Shotcreting


Operator Jackhammer/Pneumatic tamper
Operator Pump / Ventilation fan

25
26

Operator Lathe/Drilling/Shearing machine


Operator Bending / Planing machine

27
28

Operator Road roller


Operator Shovel / Scraper / Dozer

29
30

Operator Spillway / Sluice gate


Operator Crusher / Conveyor / Mucker

31
32

Operator Tipper / Dumper / Transit mixer


Operator Concrete vibrator

33
34

Operator Vibratory plain / pad foot roller


Operator Wagon drill / Drifter

35
36

Painter Cl- I
Plumber / Pipe fitter

37
38

Sarang / Khalasi
Spun pipe moulder

39
40
41

Stone chiseller CI- I / Stone cutter Cl- l


Struct. steel Fabricator / Marker / Erector
Welder / Gas Cutter

42
II.

Welder (X-ray quality)


SEMI SKILLED CATEGORY:

1
2

Asphalt Sprayer / Boiler attendant


Bhisti

3
4

Boatman with boat


Carpenter Cl- II / Erector shuttering

5
6

Cartman with double bullock cart


Cartman with single bullock cart

7
8

Chavali / Navagani
Crowbarman / Jumper man

9
10

Fitter Cl- II
Gang man / Head / Survey mazdoor

11
12
13

Gardener / Trained mali


Helper Air compressor / DG set
Helper Batching plant

14
15

Helper Blasting
Helper Bus/ Ambulance/ Lorry/ Tanker

16
17

Helper Bending/Shearing/Planing machine


Helper Carpenter

18
19

Helper Concrete / Asphalt mixer


Helper Concrete / Asphalt paver

20
21

Helper Core drilling machine


Helper Crane/ Tower crane/ Cable way

22
23

Helper Drilling jumbo / Loco / Winch


Helper Fitter / Fabrication/Electrician

24
25

Helper Grouting/ Guniting/ Shotcreting


Helper Jack hammer / Pneumatic tamper

490
420
480
420
480
420
420
480
400
400
420
420
420
480
480
420
420
420
480
480
420
420
420
420
480
420
420
480
420
420
480
420
420
480
480
480
420
420
420
480
420
480
375
375
390
375
440
415
375
375
375
375
375
375
375
375
375
375
375
375
375
375
375
375
375
375
375
labour& Hire-14-15

MA on LC @

Total
20%

98.00

588.00

84.00
96.00

504.00
576.00

84.00
96.00

504.00
576.00

84.00
84.00

504.00
504.00

96.00
80.00

576.00
480.00

80.00

480.00

84.00

504.00

84.00
84.00

504.00
504.00

96.00
96.00

576.00
576.00

84.00
84.00

504.00
504.00

84.00
96.00

504.00
576.00

96.00
84.00

576.00
504.00

84.00
84.00
84.00

504.00
504.00
504.00

96.00
84.00

576.00
504.00

84.00
96.00

504.00
576.00

84.00
84.00

504.00
504.00

96.00
84.00

576.00
504.00

84.00
96.00

504.00
576.00

96.00
96.00

576.00
576.00

84.00
84.00

504.00
504.00

84.00
96.00
84.00

504.00
576.00
504.00

96.00

576.00

75.00
75.00

450.00
450.00

78.00
75.00

468.00
450.00

88.00
83.00

528.00
498.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00
75.00

450.00
450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

Page 250 of 3205

26

Helper Laboratory / Instrumentation

27
28
29

Helper Road roller


Helper Shovel / Scraper / Dozer
Helper Crusher / Conveyor / Mucker

30
31

Helper Tipper / Dumper/ Transit mixer


Helper Vibrator

32
33

Helper Vibratory plain/ pad foot roller


Helper Wagon drill/ Drifter

34
35

Lineman Electric / Telephone


Mason Cl- ll / Brick layer Cl-II

36
37

Mechanic Cl- II
Painter Cl- II

38
39

Patkari / Neeraganti / Sowdy


Stone Chiseller Cl- II

40
41

Stone breaker / Hammer man


Valve man / Canal sluice operator

III.
1
2

UN-SKILLED CATEGORY:
Cement / Asphalt handling mazdoor
Civic worker

3
4

Man mazdoor
Woman mazdoor

5
IV.

Watchman
OTHER CATEGORY:

1
2

Care-taker / conductor / Lift Attender


Cook / Mess man

3
4

Dhobi
Diploma Engineer / Surveyor

5
6

Diver with headgear


Graduate / Laboratory Assistant

7
8

Graduate Engineer/ Geologist


Horticulture Assistant / Photographer

9
10
11

ITI certificate holder / Tracer / Printer


Literate mazdoor
Stenographer / Computer Operator

12
13

Telephone / Wireless Operator


Typist / Job Typist

14

CAD operator with Diploma in Engineering / General degree with CAD


certificate

15

Jeep Driver

16

Data Processing Operator

375
375
375
375
375
375
375
375
375
375
375
375
375
375
375
375

75.00

450.00

75.00
75.00
75.00

450.00
450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

75.00
75.00

450.00
450.00

320
320
320
320
320

64.00
64.00

384.00
384.00

64.00
64.00

384.00
384.00

64.00

384.00

400
400
400
600
495
495
800
400
495
385
535
480
480

80.00
80.00

480.00
480.00

80.00
120.00

480.00
720.00

99.00
99.00

594.00
594.00

160.00
80.00

960.00
480.00

99.00
77.00
107.00

594.00
462.00
642.00

96.00
96.00

576.00
576.00

130.00

780.00

650
480
650

96.00

576.00

130.00

780.00

84.00
84.00
84.00
96.00
96.00
84.00
84.00
96.00
80.00
84.00
84.00
84.00
84.00
96.00
98.00
96.00
84.00
64.00
84.00
92.00
84.00
56.00
77.00
70.00
64.00

504.00
504.00
504.00
576.00
576.00
504.00
504.00
576.00
480.00
504.00
504.00
504.00
504.00
576.00
588.00
576.00
504.00
384.00
504.00
552.00
504.00
336.00
462.00
420.00
384.00

84.00
84.00
84.00
84.00
84.00
96.00
84.00

504.00
504.00
504.00
504.00
504.00
576.00
504.00

Labour Rates - R & B SSR -2013-14


(A)

SKILLED WORKMEN

First Class
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Mason and stone Cutter


Brick Layer
Carpenter
Painter
Plumber
Welder
Fitter
Electrician( Licensed)
Cook
Mechanic
Rigger
Rigger Syrang
Well Sinker
Blaster
Bar Bender
Tipper and Heavy Vehicle Driver above 12 T
Tanker and Medium Vehicle Driver (7.5 T to 12 T)
Tanker and Light Vehicle Driver up to 7.5 T
Wagon Drill Operator upto 7.5 T
Lorry and Heavy Vehicle Driver above 12 T
Road Roller Driver ( 7.5 T to 12 T)
Road Roller Driver up to 7.5 T
Tractor Driver above 12 T
Tractor Driver ( 7.5 T to 12 T)
Tractor Driver upto 7.5 T

420
420
420
480
480
420
420
480
400
420
420
420
420
480
490
480
420
320
420
460
420
280.00
385.00
350.00
320.00

Operator
26
27
28
29
30
31
32

Pan Mixer
Concrete mixer
Vibrator
Compressor
Jack Hammer
Driller
Boring Maisthry

420
420
420
420
420
480
420
labour& Hire-14-15

new

Page 251 of 3205

33
34
35
36
37
38
39
40

Pump Operator
Turner Grade-I
Wireless Operator
Assistant Wireless Operator
Jeep Driver
Work inspector with I.T.I qualification
Work Inspector with LCE, LME, L.E.E Qualification
Work Inspector with B.E (Civil, Mechanical and Electrical qualification)

420
420
480
375
480
495
600
800

84.00
84.00
96.00
75.00
96.00
99.00
120.00
160.00

504.00
504.00
576.00
450.00
576.00
594.00
720.00
960.00

41

Work Inspector with Non-technical qualification SSLC / SSC / HSC

400

80.00

480.00

42

Mason Spl. Grade for Mossaic and Polished shahabad stone floor

420

84.00

504.00

43

Typist / Job Typist

576.00

Computer Operator

107.00

642.00

CAD Operator with Diploma in Engineering/General Degree with CAD


certificate.

480
535
650

96.00

130.00

780.00

75.00
75.00
75.00
75.00
75.00
84.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
96.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00

450.00
450.00
450.00
450.00
450.00
504.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
576.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00
450.00

(B)

SEMI-SKILLED WORKMEN

SECOND CLASS
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

375
375
375
375

Mason
Brick Layer and Stone Cutter
Carpenter
Painter
Plumber
Blacksmith
Welder
Fitter
Electrician
Caulker
Tinker
Sawyer
Brick-Moulder
Pot-tile turner
Pan -tile turner
Brick and Lime Kiln man /Glazzer
Telephone Operator
Hand Driller
Quarry man
Hammer man
Thatcher
Fireman
Cleaner/Helper
Stone Packer
Jawali
Ex-Service man / Goorkha watchman
Ratton worker
Mate
Head mazdoor(Mukaddar)

375.00

420
375
375
375
375
375
375
375
375
375
375
480
375
375
375
375
375
375
375
375
375
375
375
375
(C)

Irrigation Rates
275 changed to 280

UNSKILLED WORKMEN

77

Man mazdoor
64.00
384.00
320
Irrigation Rates
Watch man
64.00
384.00
320
Woman Mazdoor
64.00
384.00
320
Helpers/Cleaners/Sweepers/Scavangers/Choukidaars/Security
64.00
384.00
320
Guards/Office Boys
NOTE: Whenever unskilled workmen are engaged for cleaning of Sewers & Septic Tanks, they may be paid double of the above wages.

78

Single bullock with driver and cart

415

83.00

498.00

79

Bullock pair with driver

87.00

522.00

80

Bullock pair with driver and cart

88.00

528.00

81

Bullock pair with driver and cart with Pneumatic tyres

94.00

564.00

82

Nava with crew

435
440
470
390

78.00

468.00

83

Punt thundal

61.00

366.00

84

Punt lascar

305
305

61.00

366.00

73
74
75
76

(D)

OTHER CONVEYANCE ITEMS

Note: 1) The wage should not be less than the minimum wages of schedule of employment, subject to out turn.
2) 25% extra over the corresponding labour rates in respect of the work to be done during night time subject to issue of certificate
accordingly by the concerned estimate sanctioning authority for providing in the data and by concerned Executive Engineer in charge of
the work for payment. The night time allowance is applicable only to the works done under Greater Hyderabad Municipal Corporation,
Greater Visakhapatnam municipal corporation and Vijayawada municipal corporation limits only.

HIRE CHARGES OF PLANT & MACHINERY( IRRIGATION ) FOR THE YEAR : 2014-15
( as per Amendment)
S.No

Description of machinery

Unit

labour& Hire-14-15

Hire charge in Rs

Fuel charge in Rs

Crew
Charge in
Rs.

Total in Rs

Page 252 of 3205

1
1

Agitator car / Transit mixer 2 cum

3
Hour

Air compressor 5 cmm ( electric )

Air compressor 7 cmm ( diesel )

758.40

862.10

Hour

108.30

274.90

1887.30
155.00 538.20

Hour

241.30

705.40

198.40

Air compressor 7 cmm ( electric )

Hour

131.90

366.60

1145.10
155.00 653.50

Air compressor 8.5 cmm ( diesel)

Hour

275.60

881.70

198.40

Air compressor 8.5 cmm ( electric)

Hour

170.80

458.20

Air compressor 15 cmm ( electric)

Hour

138.80

1018.30

165.40

Angle Dozer 90 hp

Hour

1715.50

603.10

222.30

Batching plant 0.5 cum

Hour

114.60

122.20

2540.90
320.00 556.80

10

Batching plant 2 x 1.00 cum ( 15 Cum/hr)

Hour

405.40

366.60

320.00

11

Batching plant 2 x 1.50 cum( 50 Cum/hr)

Hour

620.70

448.00

320.00

12

Bending machine 3000 x 12 mm

Hour

42.60

122.20

13

Clamp shell and hoisting ropes

Hour

5.40

0.00

14

Concrete bucket 1.5 cum

Hour

15.80

0.00

15

Concrete hand mixer 45 / 30 ltr

Hour

5.50

0.00

16

Concrete mixer 300 / 200 ( diesel)

Hour

53.50

78.40

17

Concrete mixer 300 / 200 ltr( electric)

Hour

51.70

40.70

18

Concrete mixer 600 / 400 ( diesel)

Hour

92.70

156.80

19

Concrete mixer 600 / 400 ltr ( electric)

Hour

91.00

81.50

20

Concrete paver 100 sqm / hr

Hour

356.50

0.00

21

Concrete placer Pump / hr

Hour

1004.30

488.80

155.00

22

Convey mucker

Hour

822.80

283.50

165.40

23

Core drilling machine

Hour

319.00

235.10

24

Diesel generating set 30 KVA

Hour

65.80

627.00

1271.70
266.80 820.90
124.00 816.80

25

Diesel generating set 50 KVA

Hour

85.10

940.50

124.00

26

Diesel Loco 45 hp

Hour

381.60

529.00

155.00

27

Dewatering pump 5 hp ( diesel )

Hour

10.20

78.40

28

Dewatering pump 5 hp ( electric )

Hour

3.00

40.70

29

Dewatering pump 10 hp ( diesel )

Hour

15.20

156.80

30

Dewatering pump 10 hp ( electric

Hour

6.70

81.50

31

Dewatering pump 20 hp ( diesel )

Hour

48.30

313.50

32

Dewatering pump 20 hp ( electric

Hour

12.30

162.90

33

Drifter

Hour

322.70

0.00

34

Drilling jumbo

Hour

368.40

42.30

35

Dumper 4.5 cum

Hour

580.70

395.00

213.40

1189.10

36

Geophysical Electric resistivity meter

Hour

99.00

0.00

0.00

99.00

37

Grouting pump

Hour

24.90

40.70

38

Guniting / sand blast equipment

Hour

110.10

0.00

39

Ice plant & accessories 30 t / day

Hour

170.20

1160.90

40

Jack hammer

Hour

19.80

0.00

41

Needle vibrator 40 mm ( petrol )

Hour

7.60

19.00

42

Needle vibrator 40 mm ( electric )

Hour

8.00

8.10

43

Needle vibrator 60 mm ( petrol )

Hour

8.20

28.50

44

Needle vibrator 60 mm ( electric )

Hour

9.70

12.20

45

Planing machine 4 m stroke

Hour

117.80

122.20

46

Plate shearing machine up to 12 mm

Hour

41.90

162.90

47

Pneumatic placer 0.5 cum

Hour

171.10

0.00

48

Pneumatic tamper

Hour

20.70

0.00

49

Pug cutting machine

Hour

6.40

4.10

0.00

50

Pusher leg

Hour

12.70

0.00

0.00

12.70

51

Road roller diesel 10 t

Hour

197.20

705.40

198.40

1101.00

52

Shovel 0.50 cum 75 hp

Hour

1003.10

470.30

222.30

1695.70

53

Shovel 0.85 cum 110 hp

Hour

1706.60

862.10

222.30

2791.00

54

Stationery derrick crane

Hour

86.10

0.00

0.00

86.10

55

Tipper 5 cum

Hour

446.70

296.30

56

Tipping tub 1.5 cum

Hour

64.20

0.00

0.00

64.20

57

Tower crane 5 tonne

Hour

867.10

211.80

177.80

1256.70

58

Transformer 250 KVA

Hour

5041.00

0.00

59

Truck 10 t

Hour

414.10

296.30

60

Truck mounted derrick crane 5 t

Hour

519.70

296.30

61

Upright drilling machine/grinder

Hour

22.50

40.70

62

Ventilation fan 20 hp

Hour

11.50

162.90

63

Vibratory pad foot roller 8 t

Hour

1342.20

1018.90

64

Wagon drill

Hour

188.50

0.00

65

Water tanker 8000 ltr

Hour

402.50

296.30

( 6 Cum/hr)

labour& Hire-14-15

266.80

1355.70
155.00 784.00
1322.50

1092.00

1388.70
124.00 288.80
0.00 5.40
0.00

15.80

0.00 5.50
206.70 338.60
206.70 299.10
206.70 456.20
206.70 379.20
396.90 753.40
1648.10

1149.60

1065.60
104.80 193.40
78.60 122.30
104.80 276.80
78.60 166.80
104.80 466.60
78.60 253.80
333.50 656.20
165.40 576.10

248.00 313.60
206.70 316.80
124.00

1455.10
310.10 329.90
148.80 175.40
148.80 164.90
148.80 185.50
148.80

170.70

198.40 438.40
133.40 338.20
81.90 253.00
248.00 268.70
10.50

166.70 909.70

0.00
5041.00
166.70 877.10
166.70 982.70
187.20 250.40
27.10 201.50
248.00

2609.10
266.80 455.30
166.70 865.50

Page 253 of 3205

66

Welding set

Hour

16.00

97.80

67

Winch 35 hp ( electric )

Hour

129.40

199.60

0.00 113.80
248.00 577.00

68

Tractor with 2 T roller

Hour

69

Hydraulic Truck Crane 30T

Hour

3096.80

118.80

494.20

70

Hydraulic Truck Crane 16T

Hour

2278.10

75.00

494.20

71

Heavy Duty Airless Spray Painting Equipment

Hour

121.40

0.00

345.00
3709.80

2847.30
0.00 121.40

HIRE CHARGES OF PLANT& MACHNIERY FOR ROAD & BRIDGE WORKS FOR THE YEAR 2013-14
Sl. No. Description

Unit

SoRate for
(2013-14
Rupees)

Machine

Activity

3
Spreading

Per Hour

2,540.90

Dozer( D 80 )

Dozer( D 50 )

Cutting

Per Hour

1,649.00

Mortor Grader

Clearing

Per Hour

3,220.00

Hydraulic Excavator

Soil Ordinary

2,791.00

Front end loader

Soil loading

Per Hour
Per Hour

6
7

Tipper- 5.5 Cum


Vibratory roller 8 tonne

Smooth wheeled roller 8 tonne

Water tanker 8 Kilolitre

10

Water tanker 6 Kilolitre

11

Tractor

12

Transportation of soil, GSB,WMM, Hot mix etc

1,650.00

Per Hour

909.70

Per Hour

2,609.10

Soil compaction ,BM compaction

Per Hour

1,101.00

Water transport

Per Hour

865.50

Water transport

Per Hour

630.00

Pulling

Per Hour

415.00

Tractor with rotavator/Grader

Scarifying

Per Hour

425.00

13

Tractor with ripper attachment

Scarifying

Per Hour

425.00

14

Air Compressor

General purpose

Per Hour

438.20

15

Wet mix plant 60 TPH

Wet mix

Per Hour

1,650.00

16

Mechanical broom Hydraulic

Surface cleaning

Per Hour

375.00

17

Bitumen Pressure Distributor

Applying bitumen tack coat

Per Hour

1500.00

18

Emulsion Pressure Distributor

Applying emulsion tack coat

Per Hour

860.00

19

Hot mix Plant 120 TPH capacity

DBM/BM/SDC/Premix

Per Hour

28,200.00

20

Hot mix Plant 100 TPH capacity

DBM/BM/SDC

Per Hour

24,200.00

21

Hot mix Plant 60 TPH capacity

DBM/BM/SDC

Per Hour

21,700.00

22

Hot mix Plant 40 to 60 TPH capacity

DBM/BM/SDC

Per Hour

19,200.00

23

Paver Finisher Hydrostatic with sensor control 100 TPH

DBM/BM/SDC

Per Hour

3,060.00

24

Paver finisher Mechanical 100

Paving of WMM, paving of DLC

Per Hour

2,250.00

25

Hydraulic Chip Spreader

Surface dressing

Per Hour

2,695.00

26

Tandem Road roller

Rolling of Asphaltic surface

Per Hour

1,650.00

27

Pneumatic Road roller

Rolling of Asphaltic surface

Per Hour

1,347.00

28

Pot-Hole repair machine

Repair of pot-holes

Per Hour

887.00

29

Bitumen boiler oil fired

Bitumen Spraying

Per Hour

219.00

30

GSB Plant 50 Cum

Producing GSB

Per Hour

1,257.00

31

Mastic Cooker

Mastic wearing coat

Per Hour

78.00

32

Batching and Mixing Plant


(a)
50 Cum
(b) 15
Cum capacity
capacity

Concrete mixing

Per Hour

1,231.90

33

Transit mixer

34

Concrete pump of 45 and 30 cum

35

Cranes
(a) 80 tonnes

Concrete mixing

Per Hour

1,092.00

Transportation of concrete mix

Per Hour

1,887.30

Pumping of Concrete

Per Hour

810.00

Lifting purpose

Per Hour

(b) 35 tonnes

1,288.00
870.00

(c) 3 tonnes

422.00

(d) Crane with grab bucket 0.75 cum


(e) Crane with grab bucket 1 cum

Well foundation

Per Hour

2,268.00
3,709.00

Well foundation

Per Hour

For pouring concrete

Per Hour

15.80

Kerb making

Per Hour

660.00

(a)0.28 cum

Concrete mixing

Per Hour

456.20

(b) 1.0 cum

Concrete mixing

Per Hour

620.00

0.75 m dia to 1.20 m dia boring attachment

Per Hour

6,023.00
3,190.00

36

Concrete bucket

37

Kerb casting machine

38

Concrete mixer / Mix all

39

Piling rig with bantonite pump

40

Concrete paver finisher with 40 HP motor

Paving of concrete surface

Per Hour

41

Integrated stone crusher

Crushing of spalls 100 TPH

Per Hour

9,583.00

Crushing of spalls 200 TPH

Per Hour

20,206.00

42
43

Pre stressing jack with pump and access

Stressing of steel wires/ stands

Per Hour

155.00

Generator
250 KVA
125 KVA

Generation of electric energy

100 KVA

per hour
per hour

30 KVA

per hour

44

Pneumatic sinking of Plants

Pneumatic sinking of wells

Per K.m.

45

Truck 5.5 cum per 10 tonnes

Material transport

46

Road marking machine

Per tonne per


Perkm
Hour

Road marking

labour& Hire-14-15

1850
1320
1126
816.80

5600
877.10
133

Page 254 of 3205

47

Mobile slurry seal equipment

Mixing and laying slurry seal

Per Hour

48

Plate compacter

For compacting in medians

Per Hour

49

Drilling equipment

For drilling

Per Hour

Note: The above hire charges of machinery & plant includes crew, oils, conveyance of machinery to site and all other incidental charges.

labour& Hire-14-15

1239
58
820.90

Page 255 of 3205

Kandukur Municipality
DATA - INSPECTION WELLS
Data Based on 2015-16 SSR
20/02/16

DATA - Inspection Wells

Sn.
Description
Quantity
Rate
Unit
Amount
1 RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line
trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the
existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water
lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m,
including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

a
b
2

In ordinary soils by Mechanical means for Pipe line trenches


up to 3.00 Mts depth below GL
out put
240.0 Cum
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
375.00
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
8.32 Nos.
320.00
Municipal Allowance
20%
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
6.00 hours
2791.00
Sub total
c&d) Overheads & Contractors Profit
13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering

1 Each
1 Each

0.00
2662.40
532.48

1 hours

16746.00
19940.88
2714.95
22655.83
94.40
0.00
94.40
4.72
99.12

Rs
Rs

RBR-FNDN-1- (I-B-ii) - In ordinary soils from 3.00 Mts to 6.00Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of
soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying
sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of
50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL

out put

210.0 Cum

a)Labour

a
b
3

a
b

Stone dust Filling (C-Mat-Lead statement-S.No.23)


b) Labour
Municipal Allowance
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

0 Nos.
8.32 Nos.
20%

375.00
320.00

1 Each
1 Each

0.00
2662.40
532.48

6.00 hours

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
107.88
0.00
107.88
0.00
107.88

13.615%

0%
Rs
0%
Rs

RBR-FNDN-1- (I-B-iii) - In ordinary soils above 6.00Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying
sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of
50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL
out put
180.0 Cum
a)Labour
Stone dust Filling (C-Mat-Lead statement-S.No.23)
0 Nos.
375.00
b) Labour
10.40 Nos.
320.00
Municipal Allowance
20%
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
6.00 hours
2791.00
Sub total
c&d) Overheads & Contractors Profit
13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering

337269598.xlsx - data-Ins.Wells

1 Each
1 Each

0.00
3328.00
665.6

1 hours

16746.00
20739.60
2823.7
23563.30
130.91
0.00
130.91
6.55
137.46

Rs
Rs

Page 256 of 3205

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate:
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

162.00 Kg

5.74

Coarse aggregate 40mm graded ( C-Mat- S.No-57)


Fine aggregate (Sand) ( C-Mat-S.N.2 )

0.90 Cum
0.45 Cum

Water (including for curing) -M-189-b. irrigation SSR

1.20 Kl

1 Kg

1489.81
791.93

929.88

1 Cum
1 Cum

77.00

1340.83
356.37

1 Kl

92.40

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)


C. LABOUR:

1 hour

338.60

1 hour

338.60

Mason 1st class (labour-Irrigation.S.N.11)

0.10 Nos

420.00

1 Nos

42.00

Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Municipal Allowance

1.39 Nos
20%

320.00

1 Nos

444.80
97.36
3544.88
482.64

Rs

Grand Total

Overheads & Contractors Profit

13.615%
Rate per cu.m.

VAT & Labour cess.


Rate per 1 Cum
5

Rs
0%
Rs

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code . for FOUNDATIONS, PLINTH, PEDESTALS (Below
Plinth)
M-30 GRADE OF MIX
Material
cement (ENC-PH.Memo.146/Cement & Steel /T1
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )
Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Municipal Allowance
Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items

400.00 Kg
0.800 Cum
0.400 Cum

5.74
1854.81
791.93

1 Kg
1 Cum
1 Cum

2296.00
1483.85
316.77
4096.62

0.133 Nos.
0.267 Nos.
4.600 Nos.
20%

504.00
450.00
320.00

1 Each
1 Each
1 Each

67.03
120.15
1472.00
331.84
1659.18

1.333 hour

556.80

1 hour

742.21

1.333 hour

175.40

1 hour

1.20 Kl

103.00

1 Kl

233.81
976.02
123.60

BASIC COST per 1 cum


A

Base slab and Haunches and Toe


R.C.C. M 30 Per Cum
Centering charges ,Pg.106 to 108 of Bld. 1.A
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00
1.00
1.00
20%

Overheads & Contractors Profit

Cum
Cum
Cum

6855.42
277.00
446.00

Rs

6855.42

Rs

6855.42
277.00
446.00
89.20
7667.62
1043.95
8711.57
0.00
8711.57

1 Cum
1 Cum
1 Cum

13.615%
Total

VAT & labour cess etc,.

0%

Rate per 1 Cum up to 3.00m initial depth from GL

4027.52
0.00
4027.52

Rate for Extra Delifts


Rate per 3 to 4.00 m depth below GL
Basic Rate of RCC-M30
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every
1 m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per item no.32.(b) of the PH SSR, Pg.No.8

Depth of RCC M-30 for Base slab from Ground Level

a
b
c
d
e
f
g
h
i
j

Rate per 3 to 4.00 m depth from GL


Rate per 4 to 5.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 12 to 13.00 m depth from GL

1.00 Cum
1.00 Cum

Basic Cost

7667.62
41.00

No. of
Delifts

7667.62
7667.62
7667.62
7667.62
7667.62
7667.62
7667.62
7667.62
7667.62
7667.62
337269598.xlsx - data-Ins.Wells

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00

Delift
charges
Rs. 41
7708.62
7749.62
7790.62
7831.62
7872.62
7913.62
7954.62
7995.62
8036.62
8077.62

1 Cum
1 Cum

7667.62
41.00

OH& CP @

VAT & LC

14%

0%

1049.53
1055.11
1060.69
1066.28
1071.86
1077.44
1083.02
1088.60
1094.19
1099.77

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total

8758.15
8804.73
8851.31
8897.90
8944.48
8991.06
9037.64
9084.22
9130.81
9177.39

Page 257 of 3205

k
l
m
n
o
p
q

Rate per 13 to 14.00 m depth from GL


Rate per 14 to 15.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 18 to 19.00 m depth from GL
Rate per 19 to 20.00 m depth from GL

7667.62
7667.62
7667.62
7667.62
7667.62
7667.62
7667.62

BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC WALLS
IN BUILDINGS
M-30 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement & Steel / T1
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )

11.00
12.00
13.00
14.00
15.00
16.00
17.00

8118.62
8159.62
8200.62
8241.62
8282.62
8323.62
8364.62

1105.35
1110.93
1116.51
1122.10
1127.68
1133.26
1138.84

0.0
0.0
0.0
0.0
0.0
0.0
0.0

400.00 Kg
0.800 Cum
0.400 Cum

5.74
1854.81
791.93

1 Kg
1 Cum
1 Cum

2296.00
1483.85
316.77
4096.62

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Municipal Allowance

0.167 Nos.
0.167 Nos.
5.600 Nos.
20%

504.00
450.00
320.00

1 Each
1 Each
1 Each

84.17
75.15
1792.00
390.26
1951.32

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

1.333 hour
1.333 hour

556.80
175.40

1 hour
1 hour

1.20 Kl

103.00

1 Kl

742.21
233.81
976.02
123.60
7147.56

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum
i

Vertical walls of circular faces for Intake well

Circular walls up to 3.00m Height & Thickness of


M-30 GRADE OF MIX
Centering charges for RCC vertical walls of circular faces up to 3 m
height.- 31-b.5-Pg.8 of PH SSR)

Rs

450 mm
1.00
Cum
2.22
Sqm

7147.56
1115.00

1 Cum
1 Sqm

7147.56
2475.30
Rs

Overheads & Contractors Profit

13.615%
Total

Rate per One Cum up to 3.00m height above G.L


i
b

Rs

9622.86
1310.15
10933.01
10933.01

Vertical walls of circular faces for Intake well with extra Delifts below Ground Level
Rate of 450 thick wall, 3m depth below GL
Basic Rate of 450mm thick RCC-M30 wall
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every
1 m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per item no.32.(b) of the PH SSR, Pg.No.8

1.00 Cum
1.00 Cum

Basic Cost

9622.86
41.00

No. of
Delifts

Depth of RCC M-30 for Base slab from Ground Level

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 19 to 20.00 m depth from GL


Rate per 18 to 19.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 14 to 15.00 m depth from GL
Rate per 13 to 14.00 m depth from GL
Rate per 12 to 13.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 4 to 5.00 m depth from GL
Rate per 3 to 4.00 m depth from GL

ii

Vertical walls of circular faces for Intake well with extra lifts above Ground Level

Rate per up to 3 m height above GL


M-30 GRADE OF MIX
Lifting of cement concrete for RCC elevated reservoir. For every 1m
height or part thereof over the initial lift of 3 m ( item 32. a. of PH
SSR - Pg.8

9223.97
9270.55
9317.13
9363.72
9410.30
9456.88
9503.46

Height of RCC M-30 -wall from Ground Level

9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86

17.00
16.00
15.00
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

350 mm
1.00 Cum
1.00 Cum

Basic Cost

No. of Lifts

337269598.xlsx - data-Ins.Wells

Delift
charges
Rs. 41
10319.86
10278.86
10237.86
10196.86
10155.86
10114.86
10073.86
10032.86
9991.86
9950.86
9909.86
9868.86
9827.86
9786.86
9745.86
9704.86
9663.86

1 Cum
1 Cum

9622.86
41.00

OH& CP @

VAT & LC

14%

0%

1405.05
1399.47
1393.88
1388.30
1382.72
1377.14
1371.56
1365.97
1360.39
1354.81
1349.23
1343.65
1338.06
1332.48
1326.90
1321.32
1315.73

9622.86
134.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

1 Cum
1 Cum

Total

11724.91
11678.33
11631.74
11585.16
11538.58
11492.00
11445.42
11398.83
11352.25
11305.67
11259.09
11212.51
11165.92
11119.34
11072.76
11026.18
10979.59

9622.86
134.00

Lift charges

OH& CP @

VAT & LC

Rs. 134

14%

0%

Total

Page 258 of 3205

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 3 to 4.00 m Height from GL


Rate per 4 to 5.00 m Height from GL
Rate per 5 to 6.00 m Height from GL
Rate per 6 to 7.00 m Height from GL
Rate per 7 to 8.00 m Height from GL
Rate per 8 to 9.00 m Height from GL
Rate per 9 to 10.00 m Height from GL
Rate per 10 to 11.00 m Height from GL
Rate per 11 to 12.00 m Height from GL
Rate per 12 to 13.00 m Height from GL
Rate per 13 to 14.00 m Height from GL
Rate per 14 to 15.00 m Height from GL
Rate per 15 to 16.00 m Height from GL
Rate per 16 to 17.00 m Height from GL
Rate per 17 to 18.00 m Height from GL
Rate per 18 to 19.00 m Height from GL
Rate per 19 to 20.00 m Height from GL

i
a

Vertical walls of circular faces for Intake well

9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86
9622.86

Circular walls up to 3.00m Height & Thickness of


M-30 GRADE OF MIX
Centering charges for RCC vertical walls of circular faces up to 3 m
height.- 31-b.5-Pg.8 of PH SSR)

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00

9756.86
9890.86
10024.86
10158.86
10292.86
10426.86
10560.86
10694.86
10828.86
10962.86
11096.86
11230.86
11364.86
11498.86
11632.86
11766.86
11900.86

1328.40
1346.64
1364.88
1383.13
1401.37
1419.62
1437.86
1456.11
1474.35
1492.59
1510.84
1529.08
1547.33
1565.57
1583.81
1602.06
1620.30

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

250 mm
1.00
4.00

Cum
Sqm

7147.56
1115.00

1 Cum
1 Sqm

7147.56
4460.00
Rs

Overheads & Contractors Profit


Rate per One Cum up to 3.00m height above G.L

13.615%
Rs

Vertical walls of circular faces for Intake well with extra Delifts below Ground Level

Rate of 250 thick wall, 3m depth below GL


Basic Rate of 250mm thick RCC-M30 wall
Delifting the materials for concrete below GL, for every 1 m depth beyond
the initial depth of 3 m fro GL.( as per item no.32.(b) of the PH SSR,
Pg.No.8

11085.26
11237.50
11389.74
11541.99
11694.23
11846.48
11998.72
12150.97
12303.21
12455.45
12607.70
12759.94
12912.19
13064.43
13216.67
13368.92
13521.16

1.00 Cum
1.00 Cum

Basic Cost

11607.56
41.00

No. of
Delifts

Delift charges

Depth of RCC M-30 for Base slab from Ground Level

Rate per 3 to 4.00 m depth from GL

11607.56

1.00

Rs. 41
11648.56

b
c
d

Rate per 4 to 5.00 m depth from GL


Rate per 5 to 6.00 m depth from GL
Rate per 6 to 7.00 m depth from GL

11607.56
11607.56
11607.56

2.00
3.00
4.00

Rate per 7 to 8.00 m depth from GL


Rate per 8 to 9.00 m depth from GL

11607.56
11607.56

Rate per 9 to 10.00 m depth from GL


Rate per 10 to 11.00 m depth from GL

i
j

1 Cum
1 Cum

11607.56
1580.37
26375.86

11607.56
41.00

OH& CP @

VAT & LC

14%

0%

Total

1585.95

0.0

13234.51

11689.56
11730.56
11771.56

1591.53
1597.12
1602.70

0.0
0.0
0.0

13281.09
13327.68
13374.26

5.00
6.00

11812.56
11853.56

1608.28
1613.86

0.0
0.0

13420.84
13467.42

11607.56
11607.56

7.00
8.00

11894.56
11935.56

1619.44
1625.03

0.0
0.0

13514.00
13560.59

Rate per 11 to 12.00 m depth from GL


Rate per 12 to 13.00 m depth from GL

11607.56
11607.56

9.00
10.00

11976.56
12017.56

1630.61
1636.19

0.0
0.0

13607.17
13653.75

k
l

Rate per 13 to 14.00 m depth from GL


Rate per 14 to 15.00 m depth from GL

11607.56
11607.56

11.00
12.00

12058.56
12099.56

1641.77
1647.36

0.0
0.0

13700.33
13746.92

m
n

Rate per 15 to 16.00 m depth from GL


Rate per 16 to 17.00 m depth from GL

11607.56
11607.56

13.00
14.00

12140.56
12181.56

1652.94
1658.52

0.0
0.0

13793.50
13840.08

o
p

Rate per 17 to 18.00 m depth from GL


Rate per 18 to 19.00 m depth from GL

11607.56
11607.56

15.00
16.00

12222.56
12263.56

1664.10
1669.68

0.0
0.0

13886.66
13933.24

Rate per 19 to 20.00 m depth from GL

11607.56

17.00

12304.56

1675.27

0.0

13979.83

ii

Vertical walls of circular faces for Intake well with extra lifts above Ground Level

Rate per up to 3 m height above GL


M-30 GRADE OF MIX
Lifting of cement concrete for RCC elevated reservoir. For every 1m
height or part thereof over the initial lift of 3 m ( item 32. a. of PH
SSR - Pg.8 )

f
g
h

300 mm
1.00 Cum
1.00 Cum

Basic Cost

11607.56
134.00

No. of Lifts

Lift charges

Height of RCC M-30 -wall from Ground Level

a
b

Rate per 3 to 4.00 m Height from GL


Rate per 4 to 5.00 m Height from GL

11607.56
11607.56

1.00
2.00

Rs. 134
11741.56
11875.56

c
d

Rate per 5 to 6.00 m Height from GL


Rate per 6 to 7.00 m Height from GL

11607.56
11607.56

3.00
4.00

Rate per 7 to 8.00 m Height from GL


Rate per 8 to 9.00 m Height from GL

11607.56
11607.56

Rate per 9 to 10.00 m Height from GL


Rate per 10 to 11.00 m Height from GL

i
j

1 Cum
1 Cum

11607.56
134.00

OH& CP @

VAT & LC

14%

0%

Total

1598.61
1616.86

0.00
0.00

13340.17
13492.42

12009.56
12143.56

1635.10
1653.35

0.00
0.00

13644.66
13796.91

5.00
6.00

12277.56
12411.56

1671.59
1689.83

0.00
0.00

13949.15
14101.39

11607.56
11607.56

7.00
8.00

12545.56
12679.56

1708.08
1726.32

0.00
0.00

14253.64
14405.88

Rate per 11 to 12.00 m Height from GL


Rate per 12 to 13.00 m Height from GL

11607.56
11607.56

9.00
10.00

12813.56
12947.56

1744.57
1762.81

0.00
0.00

14558.13
14710.37

k
l

Rate per 13 to 14.00 m Height from GL


Rate per 14 to 15.00 m Height from GL

11607.56
11607.56

11.00
12.00

13081.56
13215.56

1781.05
1799.30

0.00
0.00

14862.61
15014.86

m
n
o

Rate per 15 to 16.00 m Height from GL


Rate per 16 to 17.00 m Height from GL
Rate per 17 to 18.00 m Height from GL

11607.56
11607.56
11607.56

13.00
14.00
15.00

13349.56
13483.56
13617.56

1817.54
1835.79
1854.03

0.00
0.00
0.00

15167.10
15319.35
15471.59

p
q

Rate per 18 to 19.00 m Height from GL


Rate per 19 to 20.00 m Height from GL

11607.56
11607.56

16.00
17.00

13751.56
13885.56

1872.27
1890.52

0.00
0.00

15623.83
15776.08

f
g
h

337269598.xlsx - data-Ins.Wells

Page 259 of 3205

BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational,
incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department
including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished
item of work. for RCC SLABS, BEAMS

M-30 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement & Steel /T1)

400.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.067 No
0.133 No
3.077 No

Municipal Allowance
c

5.74
1854.81
791.93

504.00
450.00
320.00

1 Kg

2296.00

1 Cum
1 Cum

1483.85
316.77
4096.62

1 No
1 No
1 No

20%

215.65
1078.26

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

0.308 hour
0.308 hour

556.80
175.40

1 hour
1 hour

Water (including for curing) -M-189- SSR- irrigation items

1.200 Kl

103.00

1 Kl

BASIC COST per 1 cum


A

RCC M 30 Slabs up to 3.66 Mts height

RCC M 30 Slabs up to 3.66m Height & Thickness of

33.77
59.85
984.64

171.49
54.02
225.51
123.60
Rs

5523.99

Rs

5523.99
1514.09
1013.84
202.77
8254.69
1123.88
9378.57
0.00
9378.57

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
6.670 Sqm
6.670 Sqm
20%

Overheads & Contractors Profit

5523.99
227.00
152.00

1 Cum
1 Sqm
1 Sqm

13.615%
Total

VAT & labour cess etc,.


Rate per One Cum
b

0%
Rs
200 mm
1.00 Cum
5.000 Sqmt.
5.000 Sqm
20%

RCC M 30 Slabs up to 3.66m Height & Thickness of

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

5523.99
227.00
152.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Overheads & Contractors Profit

13.615%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


B

RCC M 30 Slabs up to 7.32Mts height

RCC M 30 Slabs up to 7.32m Height & Thickness of

Rs

8601.78

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items

1.000 Cum
6.670 Sqm

5523.99
409.00

1 Cum
1 Sqm

5523.99
2728.03

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

6.670 Sqm
20%

241.00

1 Sqm

1607.47
321.49
10180.98
1386.14
11567.12
0.00
11567.12

Rs
Overheads & Contractors Profit

13.615%
Total

VAT & labour cess etc,.


Rate per One Cum
b

5523.99
1135.00
760.00
152.00
7570.99
1030.79
8601.78
0.00

0%
Rs

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items

200 mm
1.00 Cum
5.000 Sqmt.

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

5.000 Sqm
20%

RCC M 30 Slabs up to 7.32m Height & Thickness of

5523.99
409.00

1 Cum
1 Sqmt.

5523.99
2045.00

241.00

1 Sqm

1205.00
241.00
9014.99
1227.39
10242.38
0.00

Rs
Overheads & Contractors Profit

13.615%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


C

RCC M 30 Slabs up to 10 Mts height (Ovserved data)

RCC M 30 Slabs up to 10.00 m Height & Thickness of

Rs

Rate per One Cum for 7.32m height


Add for extra height at 16.666% on every 0.610m height above 7.32m
Add 73% on Centering Charges i.e
Add 73% on Labour Charges i.e
VAT & labour cess etc,.

150 mm
1.00 Cum
4.393 16.67%
2728.03
1607.47
0%

337269598.xlsx - data-Ins.Wells

10242.38

10180.98
=

73%
73%
73%

1991.46
1173.45
13345.90
0.00

Page 260 of 3205

Rate per One Cum for 10.00m height


d

Rs

RCC M 30 Slabs up to 10.00 m Height & Thickness of

Rate per One Cum for 7.32m height


Add for extra height at 16.666% on every 0.610m height above 7.32m
Add 73% on Centering Charges i.e
Add 73% on Labour Charges i.e

200 mm
1.00 Cum
4.393 16.67%
2728.03
1607.47

9014.99
=

73%
73%
73%

Rate per One Cum for 10.00m height


D

RCC M 30 Slabs up to 15.00 Mts height

RCC M 30 Slabs up to 15.00m Height & Thickness of

Rs

1991.46
1173.45
12179.91
12179.91

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No,31.a (ELSR ) up to 15m

1.000 Cum
6.670 Sqm

Overheads & Contractors Profit

5523.99
3260.00

1 Cum
1 Sqm

5523.99
21744.20
Rs

27268.19
3712.56
30980.75
0.00

Rs

30980.75

13.615%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


b

13345.90

200 mm

RCC M 30 Slabs up to 15.00m Height & Thickness of

Cost of M- 30 grade mix


Centering charges ,Pg No..,31.a (ELSR )

1.00 Cum
5.000 Sqmt.

5523.99
3260.00

1 Cum
1 Sqmt.
Rs

Overheads & Contractors Profit

13.615%
Total

VAT & labour cess etc,.


Rate per One Cum

0%
Rs

5523.99
16300.00
21823.99
2971.34
24795.33
0.00
24795.33

DATA FOR FOOT BRIDGES


8

BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500
grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage

1.05 Ton

Binding wire- SSR (Irrigation) item No 3, Pg 11


B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled-Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Municipal Allowance
Sundries on Material

34000.00

1 Ton

35700.00

6.00 kg

70.00

1 kg

420.00

10.00 day
10.00 day
20%

490.00
320.00

1 day
1 day

4900.00
3200.00
1620
44220.00

(c) Overheads on (a+b)


(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
VAT & Labour cess.
Rate per One MT
Rate per One Kg

13.615%
1 MT
0%
Sub Total:
Rs.

6020.55
50240.55
0.00
50240.55
50.24

IRR-DAW-2-12: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete
using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding,
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm x 20
cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5 cm thick
and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping chamferred or rounded as directed etc., complete ( excluding cost of
providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 300 kg / cum with use of super
plasticiser(0.4% by wt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Unit
A. MATERIALS:
Cement mix
Cenent for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm ( C-Mat-Sn.47)
Coarse aggregate 10-4.75 mm ( C-Mat-Sn.58)
Fine aggregate ( screened ) ( C-Mat-Sn.3)
Super plasticiser - (Irri. SSR. Sn.70, Pg. 14)
Use rate of shuttering (rate as per Sub- data)
Scaffolding of shuttering @
Sundries
B. MACHINERY:
Concrete mixer 300 / 200 ltr ( ele
Needle vibrator 40 mm ( ele )

36 Rmt

2450 kg
35.00 kg
3.64 cum
1.96 cum
3.08 cum
9.80 kg
115.00 sqm

5.74
5.74
1854.81
1519.81
858.93
86.00
218.86

1 kg
1 kg
1 cum
1 cum
1 cum
1 kg
1 sqm

14063.00
200.90
6751.51
2978.83
2645.50
842.80
25168.90
3775.34
30.00
56456.78

556.80
175.40

1 Hour
1 Hour

4454.40
1403.20

15%
2.00 LS

8.00 Hour
8.00 Hour
337269598.xlsx - data-Ins.Wells

Page 261 of 3205

0.50 Hour

166.80

1 Hour

83.40
5941.00

2.00 Day
1.00 Day
20%

504.00
400.00

1 Day
1 Day

1008.00
400.00
281.6

2.00 Day
9.00 Day
4.00 Day
2.00 Day
7.00 Day
2.00 Day
115.00 sqm

320.00
320.00
320.00
320.00
320.00
320.00
86.46

1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
1 sqm

640.00
2880.00
1280.00
640.00
2240.00
640.00
9942.90
1491.44
21443.94
83841.72
11415.05
95256.77
0.00
95256.77
2646.02

10 hp pump ( ele )
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
work inspector ( Labour - irrigation- Sn. 10 )
Municipal Allowance
mazdoor ( Labour - Irrigation- Un skilled Sn.3)
for batching cement ( cement handling )
for batching other materials
for loading mortar pans
for laying & packing concrete
for conveying concrete
for curing & miscellaneous
Labour for shuttering ( Rate as per Sub-data)
Labour for scaffolding @

15%

Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for cum 1854.81
VAT & labour cess etc,.

13.615%
0%

Rate per 1 Rmt


10

Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper etc,
complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH items)

1 Hp.hr

Total
Overheads & Contractors Profit

53.00

1 Hp.hr
Rs

53.00
7.22
60.22
0.00

Rs

60.22

13.615%

VAT & Labour cess.

0%
Rate per 1HPhr

11

53.00

BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers
not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Municipal Allowance
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess

6.00 Cum

0.00 Nos
0.31 Nos
20%
13.615%

450.00
384.00

1 Nos
1 Nos

0.00
119.04
23.81
16.21
159.06
26.51
0.00
26.51

0%
Rate per 1 Cum

12

Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and horizontals fixed at 25 cm c/c as per
aprooved drawing and as directed by the departmental officers and painting both sides with anti corrosive paint two coats over one coat of primary coat
including cost of all materials fabrication, welding transportation to site, all taxex and duties, fixing in position duly embodying in CC (1:1.5:3) prop., and all
other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 4.42 kg/Rmt =

61.05 kg

total

61.05 kg

Cost of MS channels ( Rate of steel as per ENC-(PH),memo )

61.05 kg

38.00

1 kg

2319.90

fabrication charges, Item-BMM-V.14-934


add Labour allowence on fabrication
Hoisting and fixng in position
Painting with synthetic enamel paint aera = 17 x 0.2

61.05 kg
20%

22.00

1 Kg

1343.10
268.62

476.56

10 Sqm

2.90 sqm

138.20

Rate for 4.00 Rmt


VAT & labour cess

4069.82
0.00
4069.82

0%

for 1.00 Rmt


Rate per 1.00 Rmt
Rate per 1.00 Kg
13

Rs.
Rs.

1017.46
1017.46
66.66

Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers and frames anywhere in A.P., F.O.R. destination including, loading, unloading & stacking at site ,central excise duty,but excluding sales tax, octroi and other Govt levies etc., as applicable.ISI mark
Table 29, Pg No.80 of the SSR (PH items)
H.D.-20 with 560mm dia clear opening
Add CED @
Add ST @

1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

13.615%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each
337269598.xlsx - data-Ins.Wells

2133.00

1 each

2133.00
266.63
106.65
2506.30
290.41
2796.75
0.00
2796.75

Page 262 of 3205

Use rate of shuttering and Scaffolding materials :


Consider one shutter and one soldier set :
Size of shutter considered : 900 mm x 1200 mm
Length of soldier for fixing shutter
4 mm thick plate 1.08 sqm @ 31.4 kg / sqm
50x50x6 mm angle 6.6 m length @ 3.8 kg / m
50x6 mm flat 1.8 m length @ 2.35 kg / m
ISLC 100 2.3 m length @ 7.9 kg / m
6 mm plate 0.03 sqm @ 47.1 kg / sqm

1.08 sqm
2.30 m
33.91 kg
25.08 kg
4.23 kg
18.17 kg
1.41 kg
82.80 kg

Cost of 4 mm plate 33.91 kg


Cost of 6.6 m angle 25.08 kg
Cost of 1.8 m flat 4.23 kg
Cost of 2.3 m soldier 18.17 kg
Cost of 6mm plate 1.41 kg

33.91 Kg
25.08 Kg
4.23 Kg
18.17 Kg
1.41 Kg

37.00
38.00
38.00
38.00
37.00

1 Kg
1 Kg
1 Kg
1 Kg
1 Kg

Add for wastage @


Add for bolts & nuts @ 0.5 kg / sqm - M-130 - Irri
Add for fabrication of shutter (Sn.15, Pg.24) Irri

0.5 Kg
82.80 Kg

2.50%
100.00
24.00

1 Kg
1 Kg

Deduct salvage value @

15%

Use rate of shutters:


Use rate of shutters considering average
Add for repairs / replacements / catwalks etc.@
Add for binding wire / temperary supports etc.@
Add for 2 J-bolts / sqm for fixing soldier @ Rs:Sn.46, Pg.13
Add for shutter oil at 0.2 ltr / sqm Rs: Sn. 14, Pg.23

40 Uses
15%
5%
35.00
78.00

2 Nos
0.2 ltr

1 No
1 ltr

1254.67
953.04
160.74
690.46
52.17
3111.08
77.78
50.00
1987.2
5226.06
-783.91
4442.15
111.05
16.66
5.55
70.00
15.60
218.86

Effective area of shutter & soldier


( allowing 10 cm margin at top / bottom )
Use rate of shuttering for concrete / use / sqm for 40 uses
( Excluding T & P / Profit / Overheads)
Erection and dismantling shuttering / scaffolding :
2 Fitters, 1 Carpentor Cl-II & 5 mazdoors erect 50 sqm shuttering &
scaffolding / day.

100.00 sqm

Cost of dismantling assumed at 50 % of erection charges.


Area of shuttering with scaffolding / supports considered.
Cleaning, conveying, erection and oiling:
Fitter shuttering ( Labour-Irri-Skilled-Sn.40)
Carpentor Cl -II ( Labour-Irri-II-Sn.40)
mazdoor
Dismantling and stacking:
Fitter shuttering 2 Nos.
Carpentor Cl -II 1 Nos.
mazdoor 5 Nos.

4 Nos
2 Nos
10 Nos

576.00
450.00
320.00

1 Kg
1 Kg
1 Kg

2304.00
900.00
3200.00

2 Nos
1 Nos
2 Nos

576.00
450.00
320.00

1 Kg
1 Kg
1 Kg

1152.00
450.00
640.00
8646.00
86.46

Labour charges for shuttering / scaffolding per sqm


( Excluding T & P / Profit / Overheads / Hidden costs )

337269598.xlsx - data-Ins.Wells

Page 263 of 3205

Kandukur Municipality

DATA - ALL PIPE LINE WORKS RELATED TO WATER SUPPLY AND SEWERS
Data Based on 2015-16 SSR
20/02/16

DATA - WATER SUPPLY

Sn.
Description
Quantity
1 Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound ma
materials for pipe line trench work. as directed by the departmental officers.
Rate as per PH SSR item no 25a, Pg.6
1 Sqm
Add for Municipal Allowance at
20%
Overheads & Contractors Profit
14%
Total
VAT & Labour cess.
0%
Rate per 1 Sqm
2

Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed b
Rate as per PH SSR item no 25b,Pg.6
Add for Municipal Allowance at

1 Cum
20%
14%

Overheads & Contractors Profit

Total
VAT & Labour cess.

0%
Rate per 1 Cum

Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe l
departmental officers.
Rate as per PH SSR item no 25 c,Pg.6
Add for Municipal Allowance at
Overheads & Contractors Profit
Total
VAT & Labour cess.

1 Cum
20%
14%
0%
Rate per 1 Cum

RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork exc
line trenches as per drawings and technical specifications including setting out, construction of shoring and b
deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH a
officer including protecting the existing utility services wherever it is possible during the execution and takin
restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches w
disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete
means.

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
3.64 Nos.
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches @
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
337269598.xlsx - data-WS

14%
75%

0%
5%

Page 264 of 3205

Rate per 1 Cum including Dewatering

337269598.xlsx - data-WS

Page 265 of 3205

a
b
6

RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring
other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as
including protecting the existing utility services wherever it is possible during the execution and taking all prec
areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated
remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Li

In ordinary soils by Mechanical means for Pipe line trenches


up to 3.00 Mts depth below GL
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

240.0
0 Nos.
8.32 Nos.
6.00 hours
14%

0%
5%

RBR-FNDN-1- (II-B) - Ordinary rock (not requiring blasting) -up to 3.00Mts. below GL by Machanical m
for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring
other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 30
departmental officer including protecting the existing utility services wherever it is possible during the exe
measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal o
all incidental and operational charges etc., complete for Pipe Line trenches by machanical means.

Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m depth


up to 3.00 Mts depth below GL
out put

180.0

a)Labour

0 Nos.
6.24 Nos.

Mate ( Labour- R&B-S.N.71)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery

Hydraulic Excavator - (Hire charges R & B- S.N.4)

6.00 hours

Sub total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
7

14%

0%

RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: Excavation in Hard Rock
blasting can not be done for Pipe line trenches as per drawings and technical specifications including sett
bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Sp
and as directed by the departmental officer including protecting the existing utility services wherever it is poss
all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic
50 m, including all incidental and operational charges etc., complete
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
337269598.xlsx - data-WS

10.00
0.00 Nos
5.20 Nos

Page 266 of 3205

b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers ( Hire
charges- Irrigation-S.N.3)
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d+e)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
8

a
b
9

6.00 hour

14%

0%

RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of soils up to 3.00
means as per drawing and technical specifications including setting out, construction of shoring and bra
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
3.64 Nos.
Sub total
c&d) Overheads & Contractors Profit
14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering

RBR-FNDN-1- ( I-A-ii ) In ordinary soils, 3.00 Mts to 6.00Mts. depth below GL by Manual means: Earthwo
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring
other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 30
departmental officer including protecting the existing utility services wherever it is possible during the exe
measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling
material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational ch
trenches by manual means.
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
3.00 Mts to 6.00 Mts. depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
a) Labour
4.68 Nos.
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches @
Cost for 240 cum = a+b+c+d

13.615%
75%

Rate per cum = (a+b+c+d)/10

VAT & Labour cess.

0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

337269598.xlsx - data-WS

0%

Page 267 of 3205

10

RBR-FNDN-1- (I-B-ii) - In ordinary soils from 3.00 Mts to 6.00Mts depth below GL by Mechanical m
kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construc
of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 30
departmental officer including protecting the existing utility services wherever it is possible during the exe
measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling
material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charg
mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL

out put

210.0

a) Labour

a
b
11

Mate ( Labour- R&B-S.N.71)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

0 Nos.
8.32 Nos.
6.00 hours
13.615%

0%
0%

RBR-FNDN-1- ( I-A-iii ) In ordinary soils, above 6.00Mts. depth below GL by Manual means: Earthwork ex
line trenches as per drawings and technical specifications including setting out, construction of shoring and b
deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH a
officer including protecting the existing utility services wherever it is possible during the execution and takin
restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches w
disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete
means.
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
Above 6.00 Mts. depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
6.24 Nos.
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches @
Cost for 240 cum = a+b+c+d

13.615%
75%

Rate per cum = (a+b+c+d)/10

VAT & Labour cess.


a
b
12

0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

5%

RBR-FNDN-1- (I-B-iii) - In ordinary soils above 6.00Mts depth below GL by Mechanical means: Earthwor
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring
other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as
including protecting the existing utility services wherever it is possible during the execution and taking all prec
areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated
remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Li

337269598.xlsx - data-WS

Page 268 of 3205

a
b
13

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL
out put
180.0
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
10.40 Nos.
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
6.00 hours
Sub total
c&d) Overheads & Contractors Profit
13.615%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering
PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost an
charges and removal of shoring and shuttering at appropriate places as directed by the departmental officers
charges etc, complete.
Single staging from 0 to 8-0 ( 0 to 2.5 Metre)
Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M deep.
Area = 30 x 1.5 = 45 sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi skilled-S.N.17)

0.570 day

Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Material
Polling boards and ballies
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 x 0.038) (Pg.310 of Irri.SSR-Sn.-47-Pg.13 Jungle wood planks)

1.100 day

Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 4 x 1.5

0.160 cum

sqm
0.110 cum

BMC-X.05- Pg.No.104 of Bld.SSR-Casuarina Balli Props - 3" to 4"


dia - 12'-0" Height( Approx 9 Nos of Ballies equals to 0.16Cum, cost
of each balli =Rs. 68 (9x68 =612 )or 3825 for 1 Cum
DeductCredit for materials after use @ 80% of the cost of materials
=0.8 x X
c) Machinery
Total
Overheads & Contractors Profit
(d) Cost for 45 sqm (a+b+c)
Rate per each sqm = d/45
VAT & Labour cess.
Rate per 1 Sqm

337269598.xlsx - data-WS

14%

0%

Page 269 of 3205

Double staging from 8 to 14 ( 2.5 to 4.5 Metre)


Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M deep.
Area = 30 x 1.5 = 45 Sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi skilled-S.N.17)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Material
Polling boards and ballies
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 x 0.038 = 0.57
cum)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 4 x 1.5 = 1.1
cum
BMC-X.05- Pg.No.104 of Bld.SSR-Casuarina Balli Props - 3" to 4"

0.500 day
1.320 day
sqm
0.110 cum
0.220 cum

dia - 12'-0" Height( Approx 9 Nos of Ballies equals to 0.16Cum, cost


of each balli =Rs. 68 (9x68 =612 )or 3825 for 1 Cum

DeductCredit for materials after use @ 80% of the cost of materials


=0.8 x X
c) Machinery
Total
Overheads & Contractors Profit
14%
(d) Cost for 45 sqm (a+b+c)
Rate per each sqm = d/45
VAT & Labour cess.
0%
Rate per 1 Sqm
Triple staging beyond 14 for every 2 meter (beyond 4.5 M) Add for every 2 Mts (difference of single and double
Rate for 6.50m
Rate for 8.50m
Rate for 10.50m

14

PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for tre
below G.L
Taking output 3 Rmt
Material
Bamboos of 1 dia 2.5 M long (5 ft c/c = 3 x 2.5) - BMC-X.12
-Sl.No.1024, Pg.104 of Bld.SSR
Bamboos of 1 dia 3.66 M long (5 ft c/c = 3x 3.66) - BMC-X.12
-Sl.No.1024, Pg.104 of Bld.SSR
Cost of Bamboos
(a) Usage of Material 5 times. Thus Cost of Material taken as 20%
(b) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
(c) Sundries for Coir rope, nails, @ 1%
(d) Sundries for lighting and watching etc at 1%
Overheads & Contractors Profit
Cost for 3rmt (a+b+c+d)
Rate per each rmt = (a+b+c+d)/3
VAT & Labour cess.
Rate per 1 Rmt

337269598.xlsx - data-WS

7.50 rmt
10.98 rmt

0.500 day

14%

0%

Page 270 of 3205

15

BLD-CSTN-2-8 (16) : Collection ,Supply and filling of Sand from approved quarry to work site and stack
premeasurements
including cost and convenyance of all material and all labour charges etc. complete as
305.3.9 MORD & 304 MORTH
out put

Sand Filling

6.00

a) Material
Sand (C-Mat-Lead statement-S.No.1)

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & Labour cess.

14%

0%

Rate per 1 Cum

16

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Stone dust from approved quarry to work site and stac
premeasurements
including cost and convenyance of all material and all labour charges etc. complete as
305.3.9 MORD & 304 MORTH
out put

Stone dust Filling

6.00

a) Material
Stone dust Filling (C-Mat-Lead statement-S.No.23)

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & Labour cess.

14%

0%

Rate per 1 Cum

17

BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in
consolidating each deposited layer by watering and ramming including cost and conveyance of water to wor
labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

6.00

Cost of Gravel ( C-Mat - Sn.5)

6.00 Cum

a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess

14%

0%
Rate per 1 Cum

18

BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundat
layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost a
and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (A
out put
337269598.xlsx - data-WS

6.00

Page 271 of 3205

a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess

0.00 Nos
0.31 Nos
14%

0%
Rate per 1 Cum

19

Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, c
charges, all leads & lifts and other incidental and operational charges etc., complete.

Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km
VAT & Labour cess.

1 cum
0%
Rate per 1 Cum

Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km
VAT & Labour cess.

1 cum
0%
Rate per 1 Cum

20

Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel char
etc, complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH items)
Total
Overheads & Contractors Profit

1 Hp.hr

14%

VAT & Labour cess.

0%
Rate per 1HPhr

21

RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of exist
retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material a
with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Ma
Rubble Stone Masonry in Cement Mortar
a) labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley 3t
Total

Unit

1.25

0.000 day
0.780 day
0.270 hour
14%

C.Overheads & Contractors Profit


Total for 1.25 Cum
Total for 1 Cum

VAT & Labour cess.

0%
Rate per 1 Cum

22

RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comp
wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, dis
stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MO

Lime Concrete & CC upto M10 (Manual means)


a) labour
Mate
337269598.xlsx - data-WS

Unit
0.000 day

1.25

Page 272 of 3205

Mazdoor (unskilled)

1.040 day

b) Machinery
Tractor with trolley 3t

0.270 hour

Total

14%

C.Overheads & Contractors Profit


Total for 1.25 Cum
Total for 1 Cum

VAT & Labour cess.

0%
Rate per 1 Cum

337269598.xlsx - data-WS

Page 273 of 3205

Cement Concrete M15 & M20 (Manual means)


a) labour
Mate

Unit

Mazdoor (unskilled)

0.000 day
1.300 day

b) Machinery
Tractor with trolley 3t

0.270 hour

Total
C.Overheads & Contractors Profit
Total for 1.25 Cum
Total for 1 Cum

1.25

14%

VAT & Labour cess.

0%
Rate per 1 Cum

Reinforced Cement Concrete and prestressed Concrete (Manual


means)
a) labour
Mate
Black smith

Unit

Mazdoor (unskilled)

0.000 day
0.400 day
3.500 day

b) Machinery
Tractor with trolley 3t

0.270 hour

Cost per cu m
C.Overheads & Contractors Profit
Total for 1.25 Cum
Total for 1 Cum

1.25

14%

VAT & Labour cess.

0%
Rate per 1 Cum

23

PHE-URCI-19 : Uprooting of C.I. pipes by melting lead, loosening the joints, separating the pipes, hoisting an
but excluding earth work excavation and refilling
Details of cost for 40.26 m
80mm dia metre
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Material

0.500 day
4.000 day

For breacking lead coulked joints, melting lead etc.,

Fuel wood (local market rate)


Kerosene oil (local market rate)
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

0.373 Qtl
0.379 litre
14%

0%
Rate per 1 Rmt

100mm dia metre


(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate)
Kerosene oil (local market rate)
(c) Total = a+b
(d) Overheads & Contractors Profit
337269598.xlsx - data-WS

0.630 day
4.500 day

0.466 Qtl
0.379 litre
14%

Page 274 of 3205

(e) Cost for 40.26 m (c+d)


Rate per each m = e/40.26
VAT & Labour cess.

0%
Rate per 1 Rmt

337269598.xlsx - data-WS

Page 275 of 3205

150mm dia metre


(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate)
Kerosene oil (local market rate)
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

0.830 day
5.500 day

0.663 Qtl
0.568 litre
14%

0%
Rate per 1 Rmt

200mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate)
Kerosene oil (local market rate)
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

1.100 day
6.500 day

0.840 Qtl
0.757 litre
14%

0%
Rate per 1 Rmt

250mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

1.300 day
7.500 day

1.026 Qtl
1.137 litre
14%

0%
Rate per 1 Rmt

300mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
337269598.xlsx - data-WS

1.500 day
8.500 day

1.120 Qtl
1.515 litre

Page 276 of 3205

(c) Total = a+b


(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS

Page 277 of 3205

350mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

1.750 day
9.500 day

1.231 Qtl
1.515 litre
14%

0%
Rate per 1 Rmt

400mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.
Rate per 1 Rmt
450mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.
Rate per 1 Rmt
500mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
337269598.xlsx - data-WS

2.000 day
10.500 day

1.306 Qtl
1.894 litre
14%

0%

2.250 day
11.500 day

1.400 Qtl
2.273 litre
14%

0%

2.500 day
12.500 day

1.492 Qtl

Page 278 of 3205

Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

2.652 litre
14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS

Page 279 of 3205

24

600mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.
Rate per 1 Rmt

3.000 day
14.500 day

1.580 Qtl
3.410 litre
14%

0%

PHE-URRC-20: Uprooting of R.C.C. Pipes including breaking the collars, loosing the joint, scraping the pipe, h
10 M but excluding earthwork excavation and refilling
Taking output 10.00 Rmt
100mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9)
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.100 day
0.400 day
0.450 day

(b) Overheads & Contractors Profit


(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

150mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9)
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.100 day
0.490 day
0.560 day

(b) Overheads & Contractors Profit


(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

225mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9)
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.100 day
0.490 day
0.670 day

(b) Overheads & Contractors Profit


(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS

Page 280 of 3205

300mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9)
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.100 day
0.490 day
0.790 day

(b) Overheads & Contractors Profit


(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

25

PHE-URSW-21: Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of usefu
lead and disposal of un serviceable materials in to municipal dumps excluding the cost of earth work excavat
No.)
Details of cost for 10 m
100mm dia metre
(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.490 day
0.360 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

150mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.490 day
0.450 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

200mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.490 day
0.510 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

250mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
337269598.xlsx - data-WS

0.490 day

Page 281 of 3205

Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.570 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

300mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.490 day
0.630 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

26

Providing temparary water supply house service connections with ISI mark GI pipes and fittings so as not
connections during earth work excavation for trenches and during laying of new mains in including cost and
charges and with all incidental and operational charges etc., complete.

15mm Nominal bore GI pipe water supply line


S & F 15 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.67,Sn.278)
-2014-15 SSR
Add Municipal Allowence labour charges( as per -BMW-F.68 Sn.269) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2014-15- SSR item
ELEC-1.2.23, Sn.74

1 Rmt

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

20mm Nominal bore GI pipe water supply line


S & F 20 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.69,Sn.280)
-2014-15 SSR
Add Municipal Allowence labour charges( as per -BMW-F.70 Sn.281) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2014-15 SSR item
ELEC-1.2.23, Sn.74

1 Rmt

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

25mm Nominal bore GI pipe water supply line


S & F 25 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.71,Sn.282)
-2014-15 SSR

337269598.xlsx - data-WS

1 Rmt

Page 282 of 3205

Add Municipal Allowence labour charges( as per -BMW-F.72 Sn.283) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2014-15 SSR item
ELEC-1.2.23, Sn.74

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

337269598.xlsx - data-WS

Page 283 of 3205

a) S& F 32 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings i
& labour charges complete
32mm Nominal bore GI pipe water supply line
S & F 32 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.73,Sn.284)
2014-15 SSR
Add Municipal Allowence labour charges( as per -BMW-F.74 Sn.284) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2014-15- SSR item
ELEC-1.2.23, Sn.74

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.


Rate per 1 Rmt
e

1 Rmt

0%

a) S& F 40 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings i
& labour charges complete
40mm Nominal bore GI pipe water supply line
S & F 40 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.75,Sn.286)
2014-15- SSR
Add Municipal Allowence labour charges( as per -BMW-F.76 Sn.287) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2014-15 SSR item
ELEC-1.2.23, Sn.74

1 Rmt

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

a) S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings i
& labour charges complete
50mm Nominal bore GI pipe water supply line
S & F 50 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.77,Sn.288)
2014-15 SSR

1 Rmt

Add Municipal Allowence labour charges( as per -BMW-F.78 Sn.289) -2014-15 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2014-15 SSR item
ELEC-1.2.23, Sn.74

20%

c&d) Overheads & Contractors Profit


Total

14%

VAT & Labour cess.

1 Rmt

0%
Rate per 1 Rmt

27

Providing temporary U PVC rider mains for sewage connections so as not to distrub the existing sewer
excavation for trenches and during laying of new mains including cost and conveyance of all materials, labou
operational charges etc., complete.
110mm dia U PVC 4 kg/SqCm
110mm dia PVC pipe as per data sheet
Lowering charges
Earth work Excavation charges -1x0.6*0.6 = 0.36 cum
VAT & Labour cess.

1 Rmt
1 Rmt
0.36 Cum
0%

337269598.xlsx - data-WS

Page 284 of 3205

Rate per 1 Rmt including 14% CP

337269598.xlsx - data-WS

Page 285 of 3205

28

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nomina
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and con
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing ,
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation an
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1


Coarse aggregate 40mm graded ( C-Mat- S.No-57)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)


C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

1 hour
0.10 Nos
1.39 Nos

Sub- Total

d) Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum
29

0%

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nom
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and con
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing ,
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation an
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)


C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

1 hour
0.10 Nos
1.39 Nos

Grand Total

Overheads & Contractors Profit

14%
Rate per cu.m.

Rate per 1 Cum


30

BLD-CSTN-3-10- ( 27 ) Hand mixing : Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggreg
size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, c
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers
level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:
Water (including for curing) -M-189-b. irrigation SSR

Coarse aggregate 20mm graded (C-Mat-Sn.48)


Fine aggregate (Sand)
Water (including for curing)
337269598.xlsx - data-WS

220.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

Page 286 of 3205

B. LABOUR:

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit

14%
Rate per cu.m.

Rate per 1 Cum


31

BLD-CSTN -3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-2
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance
coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying,
finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcem
PCC -M-20

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
0.10 Nos.
1.39 Nos.

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

20mm HBG graded metal- ( as per Lead S.No-49)


Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)
VAT & Labour cess.

1.00 hour
0%

BASIC COST per 1 cum


a

Pedastals / Thrust blocks/ Anchor blocks


P.C.C. - M-20 Per Cum
Centering charges ,Pg No. 84 to 89 of Bld. Items
Labour charges,Pg No. 84 to 89 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

Rate per One Cum


b

CC (1:2:4) walls of ----mm thick ness


P.C.C. - M-20 Per Cum
Centering charges rate s per Sl. No. Q of page No.7- Sn. 31.b.4

0.20 m

Overheads & Contractors Profit

14%

1.00 Cum
5.00 Sqm

Total
Rate per One Cum
c

P.C.C. - M-20 for 0.910 Mts at bottom,0.53 at top, 100mm thick


ring of 1.00 m height with nomonal reinforcement
Qty of Ring = x(((0.552 -0.452)+(0.382-0.282))/2 x 1
Basic Rate per Cum.
Centering Charges for Bed Blocks and Bands
Labour charges
Add Labour component @
add steel @ 50 Kg/ Cum (cost excluding 14% CP)
337269598.xlsx - data-WS

0.33 Cum
0.33 Cum
0.33 Cum
20%
16.50 Kg

Page 287 of 3205

Total
Overheads & Contractors Profit
VAT & Labour cess.
Rate per each ring
d

14%
0%

Supply & fixing CC (1:2:4) cover 1.00m x 0.45 m in panels with


nominal reinforcement 100mm thick and hooks for lifting
Basic Rate of CC (1:2:4) -1.0x0.45 x0.075
Add Centering charges
add steel @ 75 Kg/ Cum

0.034 Cum
0.034 Cum
2.53 Kg
Total

Overheads & Contractors Profit


Rate per each slab of 1.00m x 0.45m- 0.1m thick
32

14%

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-3
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance
coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying,
finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcem

PCC -M-30
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)
Overheads & Contractors Profit

400.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
0.10 Nos.
1.39 Nos.
1.00 hour
14%

BASIC COST per 1 cum


33

BLD-CSTN-3-12-(29) Using Concrete mixture : Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement
using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials
water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ram
surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:

0.10 day
1.39 day

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

Sub - Total
c.Overheads & Contractors Profit
Rate per 1 Rmt

337269598.xlsx - data-WS

14%

Page 288 of 3205

34

BLD-CSTN-3-13-(30)-C ; RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding t


graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and con
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & othe
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete
fabrication charges for finished item of work, but excluding centering, shuttering . for RCC SLABS, BEAMS
RCC SLABS, BEAMS -WOODEN SCAFFOLDING
A. MATERIALS:
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

0.90 cum
0.45 cum
400.00 Kgs
Sub Total of - A

B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)
Vibrator hire
charges ( Hire charges-irrigation. Sn.41)
Water (including for curing) -M-189-b. irrigation SSR
Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit
Total
VAT & Labour cess.
Rate per One Cum
a

for pre cast/ Cast-in-situ Chamber cover not exceeding 0.45m


width with hooks for lifting

ii

RCC M 20 Slabs

0.067 day
0.133 day
2.500 day

0.267 hour
0.267 hour
1.200 kl

14%
0%

150 mm

R.C.C. M 20 nominal mix Per Cum


Centering charges ,Pg No.106 to 108
Labour charges,Pg No.106 to 108
Add Labour component @

1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

VAT & Labour cess.


Rate per One Cum
35

0%

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour cha
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & Labour cess.
Rate per 10 Sqm
337269598.xlsx - data-WS

0.15 Cum
0.60 Nos
0.96 Nos
14%
0%

Page 289 of 3205

36

BLD-CSTN-8-8-(83) : Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour cha
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & labour cess
Rate per 10 Sqm

37

14%
0%

0.210 Nos
2.000 Kg
0.660 Nos
1.540 Nos
3.70 Nos
14%
0%

BLD-CSTN-9-5: White washing two coats with whiting of approved quality to give an even shade after thorough
dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental s
complete for finished item of work, but excluding conveyance charges of materials
Whiting / White Cement -BMS-W.68-item-1012
Gum, conjee water, or prickly pear juice including necessary fire
wood
Brick Layers / Painter ( labour - Irri-Skilled-Sn.11)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Sundries including brushes, ladders, etc.,
over heads & contractors profit
Sub-Total
VAT & labour cess
Rate per 10 Sqm

39

0.94 Nos
0.16 Nos

BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20
compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charge
materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smoo
off junctions of wall and slab etc,, complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3
Water proof compound -BMT-H.01- item no.241
B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Total
over heads & contractors profit
Total cost for 10 sqm
VAT & labour cess
Rate per 10 Sqm

38

0.21 Cum

2.00 Kg
LS
0.21 Nos
0.32 Nos
1%
14%
0%

BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood W
and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc
(APSS No. 1201, 1207 & 1212).

337269598.xlsx - data-WS

Page 290 of 3205

40

Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.(BMT-J.31-Sn-400)

0.70 Ltr

1st Class Painter (I. Skilled Labour-Irrigation-Sn.35)


2nd Class Painter (II. Semi skilled Labour-Irri-Sn.37)
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
Total cost for 10 sqm
VAT & Labour cess.
Rate per 10 Sqm

0.21 day.
0.49 day.

14%
0%

BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT)
Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straig
sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-sp
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance
such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks a
charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc.,
all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire- SSR (Irrigation) item No 3, Pg 11
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled-Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Sundries on Material
(c) Overheads on (a+b)
(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
VAT & Labour cess.
Rate per One MT
Rate per One Kg

337269598.xlsx - data-WS

1.05 Ton
6.00 kg

10.00 day
10.00 day

14%
0%

Page 291 of 3205

47

Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through
erecting the equipment to true to the alignment and gradient, by hydraulic pipe jacking technique complete
types of soils including hard rock and construction of RCC chambers suitable to casing pipe pits, and conveya
required materials but excluding cost of encasing pipe, in co-ordination with the concerned authorities as per
the Engineer-in Charge.

800 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 800 mm dia MS pipe-10mm thick
Overheads & Contractors Profit

14%

VAT & Labour cess.


Rate per 1 Rmt
b

0%

900 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 900 mm dia MS pipe-10mm thick
Overheads & Contractors Profit

0%

1000 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1000 mm dia MS pipe-10mm thick
Overheads & Contractors Profit

0%

1100 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1100 mm dia MS pipe-10mm thick
Overheads & Contractors Profit

1 Rmt
1 Rmt
14%

VAT & Labour cess.


Rate per 1 Rmt
e

1 Rmt
1 Rmt
14%

VAT & Labour cess.


Rate per 1 Rmt
d

1 Rmt
1 Rmt
14%

VAT & Labour cess.


Rate per 1 Rmt
c

1 Rmt
1 Rmt

0%

1200 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1200 mm dia MS pipe-10mm thick
Overheads & Contractors Profit

1 Rmt
1 Rmt
14%

VAT & Labour cess.


Rate per 1 Rmt

0%

337269598.xlsx - data-WS

Page 292 of 3205

1300 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1300 mm dia MS pipe-10mm thick

1 Rmt
1 Rmt

Overheads & Contractors Profit

14%

VAT & Labour cess.


Rate per 1 Rmt
g

0%

1400 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1400 mm dia MS pipe-10mm thick

1 Rmt
1 Rmt

Overheads & Contractors Profit

14%

VAT & Labour cess.


Rate per 1 Rmt
g

0%

1500 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1500 mm dia MS pipe-10mm thick

1 Rmt
1 Rmt

Overheads & Contractors Profit

14%

VAT & Labour cess.


Rate per 1 Rmt
48

0%

OBSERVED DATA
Providing, Laying & Jointing of the following DI pipes of K7 class as per ISI with spigot and socket ends, with
including cost of DI pipes and specials and rubber rings, lowering, laying, jointing and testing to required pressu
all materials to the site, labour charges etc., etc. complete. ( Rates are inclusive of CP & OH )
100mm dia.DI K7 class (per Rmt)
Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data-34.b
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

150mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

200mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

337269598.xlsx - data-WS

Page 293 of 3205

250mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

300mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

350mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

400mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

500mm dia.DI K7(per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

49

Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long 16mm dia cold twisted deformed
driven in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry including cos
drilling and cleaning hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 5
Unit - 10 Nos

16 mm dia

A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 1.50m length

337269598.xlsx - data-WS

23.70 Kg

Page 294 of 3205

Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141 - R


& B SSR-2013-14 ( 10Nos x 0.75m)

7.5 Rmt

Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg No.
19 - R & B SSR-2013-14 ( 10Nos x 0.75m)

7.5 Rmt

B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Rate per 10 Nos
Rate per 1 Nos

0.50 day
0.50 day
1.00 day

Rate per Each

VAT & Labour cess.


Rate per 1 No

0%

337269598.xlsx - data-WS

Page 295 of 3205

HDPE Service Line - with 110mm dia -PE.100, 6Kg pipe

Rate of 110mm OD -HDPE 6 Kg/Sqcm -PE-100 pipe as per work


sheet
Earth work Excavation -100 x 0.5 x1.10
Sand Bedding : 100 x 0.5 x 0.10
Lowering and Jointing Charges
Rate per 100 Rmt
Rate per 1 Rmt
Add for Specials and fittings etc at 2%
VAT & Labour cess.
Rate per 1 Rmt

Unit
100 Rmt

100

55.00 Cum
5.00 Cum
100.00 Rmt

0%

Removal of Telephone/Electric Poles and Lines

RBR-STCL-23: Removal of telephone/electric poles with wires including excavation and dismantling of foun
supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the ser
separately as per Technical Specification Clause 202 MORD / MORTH.
Unit = each
Taking output = 30 Nos.
a) labour
Mate
Mazdoor (Unskilled)
Electrician / Lineman
b) Machinery
Tractor with trolley 3t

30

c&d) Overheads & Contractors Profit


Cost for 30 poles = a+b+c+d
Rate per pole = (a+b+c+d)/30
VAT & Labour cess.

10.480
2.000

day
day
day

1.500

hour

14%

0%
Rate per each

50

Shifting and errection of electric poles, telephone poles coming across the proposed alignment of the pipeline
material and all labour charges etc,. Complete.
Removal of telephone/electric poles
1 No
PSCC Pole (8.0 m) - 140 Kg WL (as per electrical cost data (APSEB)
1 No
for the year 2013-14 under centralised material for RE and
distribution works vide Pg.1-5, S.N-14)
CC (1:4:8) for foundation (pi x r2 x h ) = 3.14 x (0.30)2 x 0.75
CC (1:2:4) for support above GL (pi x r2 x h ) = 3.14 x (0.25)2 x 0.50

0.21 Cum
0.10 Cum

Erection charges of Electrical pole


Rate per each
51

Shifting of under ground cables coming across the proposed alignment of the pipeline including Earth wor
backfilling etc, complete.
RBR-FNDN-1- (i-B) - EWE In ordinary soils, by Mechanical means
per 1 Rmt - 1 x0.45 x 0.75 = 0.3375 cum
Labour charges for shifting the cable and repairs etc
Rate per 1 Rmt

337269598.xlsx - data-WS

0.3375 Cum

Page 296 of 3205

52

Manufacturing ,Supplying and errection of air valve gaurd cabins of size 0.90 x0.90 x 0.90 m made with 4 nos v
of size 50x8 mm and 12mm dia MS round bars fixed at 7.5 cm c/c with door and locking arrangements as pe
by the departmental officers and painting both sides with anti corrossive paint two coats over one coat o
materials , fabrication ,welding , transportation to site, all taxes and duties,fixing in position duly embeddin
incidental and operational charges etc complete for finished item of work.
MS flats of size 50 x 8mm @39.20Kg/Sqm
Horizontals
Vericals including 0.45m legs
12mm dia MS bars at 10cm c/c @ 0.89Kg / Rmt (0.90 / 0.075 = 12 Nos)
Painting with synthetic enamyl paint
Earth work
CC (1:2:4)
Abstract
Cost of MS Angles
Cost of MS Rods
Add fabrication charges - BMM-V.14.

8
4

0.95
1.40
12

5
4
4

0.40
0.40
25.88 Kg
48.06 Kg
73.94 Kg

Add Municipal allowence on Labour component


Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position - BMM-V.14.

20%
73.94 Kg

Add Municipal allowence on Labour component


Painting with synthetic enamyl paint
Earth work
CC (1:3:6)
Add for Locking arrangements,Transport , etc.

20%
12.96 Sqm
0.32 Cum
0.32 Cum

c&d) Overheads & Contractors Profit

14%

VAT & Labour cess.

0%
Total

53

Manufacturing ,Supplying and errection of air valve gaurd cabins of size 1.50 x 1.50 x 1.50 m made with 4 nos
of size 50x8 mm and 12mm dia MS round bars fixed at 7.5 cm c/c with door and locking arrangements as pe
by the departmental officers and painting both sides with anti corrossive paint two coats over one coat o
materials , fabrication ,welding , transportation to site, all taxes and duties,fixing in position duly embeddin
incidental and operational charges etc complete for finished item of work.
MS flats of size 50 x 8mm @39.20Kg/Sqm
Horizontals
Vericals including 0.45m legs
12mm dia MS bars at 10cm c/c @ 0.89Kg / Rmt (1.50 / 0.075 = 21 Nos)
Painting with synthetic enamyl paint
Earth work
CC (1:2:4)
Abstract
Cost of MS Angles
Cost of MS Rods
Add fabrication charges - BMM-V.14. Bld SSR-2013-14
Add Municipal allowence on Labour component
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position - BMM-V.14.
Add Municipal allowence on Labour component
Painting with synthetic enamyl paint
Earth work
CC (1:3:6)
Add for Locking arrangements,Transport , etc.

337269598.xlsx - data-WS

8
4

1.55
2.15
21

5
4
4

0.40
0.40

41.16 Kg
140.18 Kg
181.34 Kg
20%
181.34 Kg
20%
12.96 Sqm
0.38 Cum
0.38 Cum

Page 297 of 3205

c&d) Overheads & Contractors Profit

14%

VAT & Labour cess.

0%
Total

337269598.xlsx - data-WS

Page 298 of 3205

1
a

PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains where ever required (.Dia of pipes in mm.)
Details of cost for one cutting
Cutting C.I./ DI Pipe -80 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.060 day
0.060 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.
Rate per each cut
b

14%
0%

Cutting C.I./ DI Pipe -100 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.080 day
0.080 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe -125 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.110 day
0.110 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe -150 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.150 day
0.150 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe -200 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

337269598.xlsx - data-WS

0.200 day
0.200 day
14%
0%

Page 299 of 3205

Rate per each cut


g

Cutting C.I./ DI Pipe - 250 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.250 day
0.250 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 300 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.300 day
0.300 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 350 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.350 day
0.350 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 400 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.400 day
0.400 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 450 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.450 day
0.450 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 500 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
337269598.xlsx - data-WS

0.500 day
0.500 day
14%

Page 300 of 3205

VAT & Labour cess.

0%
Rate per each cut

Cutting C.I./ DI Pipe - 600 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.600 day
0.600 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 700 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 750 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 800 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 900 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 1000 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 1100 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 1200 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
337269598.xlsx - data-WS

1 No
14%

Page 301 of 3205

VAT & Labour cess.

0%
Rate per each cut

337269598.xlsx - data-WS

Page 302 of 3205

Kandukur Municipality

WORKS RELATED TO WATER SUPPLY AND SEWERS


Data Based on 2015-16 SSR
20/02/16

Rate
Unit
Amount
concrete upto 75 mm thick ) including water bound macadam and stacking of excavated
departmental officers.
656.00
10 Sqm
65.60
13.12
10.72
89.44
0.00
Rs
89.44

xcavated materials for pipe line trench work. as directed by the departmental officers.
1822.00

1 Cum

1822.00
364.40
297.68
2484.08
0.00
2484.08

Rs

soiling and stacking of excavated materials for pipe line trench work. as directed by the
224.00

1 Cum

224.00
44.80
36.6
305.40
0.00
305.40

Rs

Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe
tions including setting out, construction of shoring and bracing, removal of stumps and other
s per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental
s wherever it is possible during the execution and taking all precautionary measures in the
ncluding divertion of traffic and backfilling in trenches with excavated suitable material and
uding all incidental and operational charges etc., complete for Pipe Line trenches by manual

as per 302.2.1(a) of MORD and 301.2.1 of MORT&H


renches
Cum
450.00
384.00

1 Each
1 Each

Rs

337269598.xlsx - data-WS

0.00
1397.76
1397.76
190.31
1048.32
2636.39
263.64
0.00
263.64
13.18

Page 303 of 3205

Rs

337269598.xlsx - data-WS

276.82

Page 304 of 3205

Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for
ecifications including setting out, construction of shoring and bracing, removal of stumps and
tom as per Technical Specification 304 MORTH and as directed by the departmental officer
ver it is possible during the execution and taking all precautionary measures in the restricted
on of traffic and backfilling in trenches with excavated suitable material and disposal of
dental and operational charges etc., complete for Pipe Lines by mechanical means.

ne trenches
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
94.40
0.00
94.40
4.72
99.12

Rs
Rs

blasting) -up to 3.00Mts. below GL by Machanical means: Excavation in Ordinary Rock


pecifications including setting out, construction of shoring and bracing, removal of stumps and
bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the
g utility services wherever it is possible during the execution and taking all precautionary
ter pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including
or Pipe Line trenches by machanical means.

Means-Upto 3 m depth
Cum
450.00
384.00

1 Each
1 Each

0.00
2396.16

2791.00

1 hours

16746.00
19142.16
2606.21
21748.37
120.82
0.00
120.82

Rs

d) -up to 3.00Mts. below GL: Excavation in Hard Rock in habitant areas where conventional
per drawings and technical specifications including setting out, construction of shoring and
terial , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH
protecting the existing utility services wherever it is possible during the execution and taking
r laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of
etc., complete
Cum
450.00
384.00

1 Nos
1 Nos
337269598.xlsx - data-WS

0.00
1996.80

Page 305 of 3205

1145.10

1 hour

6870.60
8867.40
1207.3
10074.70
1007.47
0.00
1007.47

avation for structures in all types of soils up to 3.00 Mts depth below GL by manual
including setting out, construction of shoring and bracing, removal of stumps and other
, dressing of sides and bottom and backfilling in trenches with excavated suitable material as
for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,

as per 302.2.1(a) of MORD and 301.2.1 of MORT&H


n Holes etc,.
Cum
450.00
384.00

1 Each
1 Each

Rs
Rs

0.00
1397.76
1397.76
190.31
1588.07
158.81
0.00
158.81
7.94
166.75

o 6.00Mts. depth below GL by Manual means: Earthwork excavation in all kinds of soil for
ecifications including setting out, construction of shoring and bracing, removal of stumps and
bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the
g utility services wherever it is possible during the execution and taking all precautionary
ater pipe lines including divertion of traffic and backfilling in trenches with excavated suitable
ead of 50 m, including all incidental and operational charges etc., complete for Pipe Line

as per 302.2.1(a) of MORD and 301.2.1 of MORT&H


renches
Cum
450.00
384.00

1 Each
1 Each

Rs
Rs

337269598.xlsx - data-WS

0.00
1797.12
1797.12
244.68
1347.84
3389.64
338.96
0.00
338.96
0.00
338.96

Page 306 of 3205

0 Mts to 6.00Mts depth below GL by Mechanical means: Earthwork excavation in all


and technical specifications including setting out, construction of shoring and bracing, removal
of sides and bottom as per Technical Specification 304 MORTH and as directed by the
g utility services wherever it is possible during the execution and taking all precautionary
water lines including divertion of traffic and backfilling in trenches with excavated suitable
d of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by

pe line trenches
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
107.88
0.00
107.88
0.00
107.88

Rs
Rs

0Mts. depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe
tions including setting out, construction of shoring and bracing, removal of stumps and other
s per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental
s wherever it is possible during the execution and taking all precautionary measures in the
ncluding divertion of traffic and backfilling in trenches with excavated suitable material and
uding all incidental and operational charges etc., complete for Pipe Line trenches by manual

as per 302.2.1(a) of MORD and 301.2.1 of MORT&H


renches
Cum
450.00
384.00

1 Each
1 Each

Rs
Rs

0.00
2396.16
2396.16
326.24
1797.12
4519.52
451.95
0.00
451.95
22.60
474.55

Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for
ecifications including setting out, construction of shoring and bracing, removal of stumps and
tom as per Technical Specification 304 MORTH and as directed by the departmental officer
ver it is possible during the execution and taking all precautionary measures in the restricted
on of traffic and backfilling in trenches with excavated suitable material and disposal of
dental and operational charges etc., complete for Pipe Lines by mechanical means.

337269598.xlsx - data-WS

Page 307 of 3205

ne trenches
Cum
450.00
384.00

1 Each
1 Each

2791.00

1 hours

0.00
3993.60

16746.00
20739.60
2823.7
23563.30
130.91
0.00
Rs
130.91
6.55
Rs
137.46
cavation of trenches for laying pipe lines including cost and conveyance of all materials, labour
propriate places as directed by the departmental officers with all incidental and ooperational

450.00

1 day

256.50

384.00

1 day

422.40

23000.00

1 cum

2530.00

3825.00

1 cum

612.00

-628.40

3192.50
434.66
3627.16
80.60
0.00
80.60

337269598.xlsx - data-WS

Page 308 of 3205

450.00

1 day

225.00

384.00

1 day

506.88

23000.00

1 cum

2530.00

3825.00

1 cum

841.50

-674.30

3429.08
466.87
3895.95
86.58
0.00
86.58
5 M) Add for every 2 Mts (difference of single and double staging) for staging beyond 4.5 mts.
92.56
98.54
104.52

atching etc., for water supply and sewerage works for trenches of depths upto 6-0 (2 Meter)

130.00

2.44 rmt

399.59

130.00

2.44 rmt

585.00
984.59
196.92

384.00

1 day

337269598.xlsx - data-WS

192.00
3.89
3.89
396.70
54.01
450.71
150.24
0.00
150.24

Page 309 of 3205

of Sand from approved quarry to work site and stacking at work site to Dept. gauge for
e of all material and all labour charges etc. complete as per standard specifications. Clause
Cum
641.93

1 Cum

3851.58

450.00
384.00

1 Nos
1 Nos

0.00
119.04
3970.62
540.6
4511.22
751.87
0.00
751.87

f Stone dust from approved quarry to work site and stacking at work site to Dept. gauge for
e of all material and all labour charges etc. complete as per standard specifications. Clause
Cum
1001.81

1 Cum

6010.86

450.00
384.00

1 Nos
1 Nos

0.00
119.04
6129.90
834.59
6964.49
1160.75
0.00
1160.75

, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick,
ramming including cost and conveyance of water to work site and all operational, incidental,
or finished item of work. (APSS NO. 309 & 310)
Cum
306.76

1 Cum

1840.56

450.00
384.00

1 Nos
1 Nos

0.00
119.04
1959.60
266.8
2226.40
371.07
0.00
371.07

vated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in
deposited layer by watering and ramming including cost and conveyance of water to work site
arges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Cum
337269598.xlsx - data-WS

Page 310 of 3205

450.00
384.00

1 Nos
1 Nos

0.00
119.04
16.21
135.25
22.54
0.00
22.54

distance suitable including loading, unloading charges, cost & conveyance, dumping, labour
ational charges etc., complete.
82.70

82.70

1 Cum
Rs

82.70
0.00
82.70

Rs

82.70
0.00
82.70

1 Cum

ngine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper
53.00

1 Hp.hr

53.00
Rs

53.00
7.22
60.22
0.00

Rs

60.22

echnical Specification Clause 202 : Dismantling of existing structures like culverts, bridges,
e masonry, including disposal of unserviceable material and stacking the serviceable material
ification Clause 202 MORD / MORTH - Rubble Stone Masonry in Cement Mortar
Cum
450.00
384.00

1 day
1 day

0.00
299.52

415.00

1 hour

112.05
411.57
56.04
467.61
374.09
0.00
374.09

Rs

Rs

culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete,
wherever necessary, sorting the dismantled material, disposal of unserviceable material and
of 1000 m as per Technical Specification Clause 202 MORD / MORTH
Cum
450.00

1 day
337269598.xlsx - data-WS

0.00

Page 311 of 3205

384.00

1 Cum

399.36

415.00

1 hour

112.05
511.41
69.63
581.04
464.83
0.00
464.83

Rs

337269598.xlsx - data-WS

Page 312 of 3205

Cum
450.00
384.00

1 day
1 Cum

0.00
499.20

415.00

1 hour

112.05
611.25
83.22
694.47
555.58
0.00
555.58

Rs
Cum
450.00
384.00
384.00

1 day
1 day
1 Cum

0.00
153.60
1344.00

415.00

1 hour

112.05
1609.65
219.15
1828.80
1463.04
0.00
1463.04

Rs

d, loosening the joints, separating the pipes, hoisting and keeping within a lead of 10 metres

450.00
384.00

1 day
1 day

225.00
1536.00

750.00
25.00

1 Qtl
1 litre

279.75
9.48
2050.23
279.14
2329.37
57.86
0.00
57.86

Rs

450.00
384.00

1 day
1 day

283.50
1728.00

750.00
25.00

1 Qtl
1 litre

349.50
9.48
2370.48
322.74

337269598.xlsx - data-WS

Page 313 of 3205

Rs

337269598.xlsx - data-WS

2693.22
66.90
0.00
66.90

Page 314 of 3205

450.00
384.00

1 day
1 day

373.50
2112.00

750.00
25.00

1 Qtl
1 litre

497.25
14.20
2996.95
408.03
3404.98
84.57
0.00
84.57

Rs

450.00
384.00

1 day
1 day

495.00
2496.00

750.00
25.00

1 Qtl
1 litre

630.00
18.93
3639.93
495.58
4135.51
102.72
0.00
102.72

Rs

450.00
384.00

1 day
1 day

585.00
2880.00

750.00
25.00

1 Qtl
1 litre

769.50
28.41
4262.91
580.4
4843.31
120.30
0.00
120.30

Rs

450.00
384.00

1 day
1 day

675.00
3264.00

750.00
25.00

1 Qtl
1 litre

840.00
37.88

337269598.xlsx - data-WS

Page 315 of 3205

Rs

337269598.xlsx - data-WS

4816.88
655.82
5472.70
135.93
0.00
135.93

Page 316 of 3205

450.00
384.00

1 day
1 day

787.50
3648.00

750.00
25.00

1 Qtl
1 litre

923.25
37.88
5396.63
734.75
6131.38
152.29
0.00
152.29

Rs

450.00
384.00

1 day
1 day

900.00
4032.00

750.00
25.00

1 Qtl
1 litre

979.50
47.35
5958.85
811.3
6770.15
168.16
0.00
168.16

Rs

450.00
384.00

1 day
1 day

1012.50
4416.00

750.00
25.00

1 Qtl
1 litre

1050.00
56.83
6535.33
889.79
7425.12
184.43
0.00
184.43

Rs

450.00
384.00

1 day
1 day

1125.00
4800.00

750.00

1 Qtl

1119.00

337269598.xlsx - data-WS

Page 317 of 3205

25.00

1 litre

Rs

337269598.xlsx - data-WS

66.30
7110.30
968.07
8078.37
200.65
0.00
200.65

Page 318 of 3205

450.00
384.00

1 day
1 day

1350.00
5568.00

750.00
25.00

1 Qtl
1 litre

1185.00
85.25
8188.25
1114.83
9303.08
231.08
0.00
231.08

Rs

breaking the collars, loosing the joint, scraping the pipe, hoisting and keeping within a lead of

450.00
384.00
384.00

450.00
384.00
384.00

450.00
384.00
384.00

1 day
1 day
1 day

Rs

45.00
153.60
172.80
371.40
50.57
421.97
42.20
0.00
42.20

Rs

45.00
188.16
215.04
448.20
61.02
509.22
50.92
0.00
50.92

Rs

45.00
188.16
257.28
490.44
66.77
557.21
55.72
0.00
55.72

1 day
1 day
1 day

1 day
1 day
1 day

337269598.xlsx - data-WS

Page 319 of 3205

450.00
384.00
384.00

1 day
1 day
1 day

Rs

45.00
188.16
303.36
536.52
73.05
609.57
60.96
0.00
60.96

g breaking of joints and bed concrete stacking of useful materials near the site with in 50m
unicipal dumps excluding the cost of earth work excavation. (Reference to specifications BIS

384.00
384.00

1 day
1 day

188.16
138.24
326.40
44.44
370.84
37.08
0.00
37.08

384.00
384.00

1 day
1 day

188.16
172.80
360.96
49.14
410.10
41.01
0.00
41.01

384.00
384.00

1 day
1 day

188.16
195.84
384.00
52.28
436.28
43.63
0.00
43.63

384.00

1 day

188.16

337269598.xlsx - data-WS

Page 320 of 3205

384.00

1 day

218.88
407.04
55.42
462.46
46.25
0.00
46.25

384.00
384.00

1 day
1 day

188.16
241.92
430.08
58.56
488.64
48.86
0.00
48.86

nnections with ISI mark GI pipes and fittings so as not to disturb the existing water supply
es and during laying of new mains in including cost and conveyance of all materials, labour
s etc., complete.

167.00

1 Rmt

167.00

41.00
3.70

192.00

8.20
1 Rmt

3.70

Rs

178.90
24.36
203.26
0.00
203.26

Rmt

192.00

41.00
3.70

252.00

8.20
1 Rmt

3.70

Rs

203.90
27.76
231.66
0.00
231.66

Rmt

252.00

337269598.xlsx - data-WS

Page 321 of 3205

41.00
3.70

8.20
1 Rmt

3.70
263.90
35.93
299.83
0.00
Rs

337269598.xlsx - data-WS

299.83

Page 322 of 3205

perties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings

350.00

Rmt

41.00
3.70

350.00

8.20
1 Rmt

3.70

Rs

361.90
49.27
411.17
0.00
411.17

perties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings

396.00

Rmt

44.00
3.70

396.00

8.80
1 Rmt

3.70

Rs

408.50
55.62
464.12
0.00
464.12

perties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings

432.00

Rmt

67.00
3.70

432.00

13.40
1 Rmt

3.70

Rs

449.10
61.14
510.24
0.00
510.24

e connections so as not to distrub the existing sewerage connections during earth work
ns including cost and conveyance of all materials, labour charges and with all incidental and

212.41
26.85
120.82

1 Rmt
1 Rmt
1 Cum

337269598.xlsx - data-WS

212.41
26.85
43.50
282.76
0.00

Page 323 of 3205

Rs

337269598.xlsx - data-WS

326.26

Page 324 of 3205

s up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine
d Granite Machine Crushed Metal including cost and conveyance of all materials like cement,
ge charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm
g etc., complete for finished item of work.for foundation and under flooring bed.

5.740
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
356.37
123.60

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3487.46
474.82
3962.28
0.00
3962.28

Rs
Rs

works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine
d Granite Machine Crushed Metal including cost and conveyance of all materials like cement,
ge charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm
g etc., complete for finished item of work.for foundation and under flooring bed.

5.74
1489.81
791.93
77.00

1 Kg
1 Cum
1 Cum
1 Kl

929.88
1340.83
356.37
92.40

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3642.24
495.89
4138.13
4138.13

Rs
Rs
Rs

concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using 20mm
cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
, for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required
foundation and under flooring bed.

5.74
1854.81
791.93
77.00

1 Kg
1 Cum
1 Cum
1 Kl
337269598.xlsx - data-WS

1262.80
1669.33
356.37
92.40

Page 325 of 3205

504.00
384.00

1 day
1 day
Rs
Rs
Rs

50.40
906.24
4337.54
590.56
4928.10
4928.10

Plinth Level : Plain Cement concrete nominal mix M-20 (Cement : fine aggregate: coarse
Crushed Graded Metal including cost and conveyance of all materials like cement, sand,
ges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers,
omplete for finished item of work with nomonal reinforcement

5.74
1854.81
791.93
77.00
504.00
384.00

1 Kg
1 Cum
1 Cum
1 Kl
1 Each
1 Each

1894.20
1669.33
356.37
92.40
50.40
533.76

338.60

1 hour

Rs

338.60
4935.06
0.00
4935.06

Rs

4935.06
315.00
710.00
142.00
6102.06
830.8
6932.86
6932.86

4935.06
315.00
710.00

4935.06
876.00

1 Cum
1 Cum
1 Cum

1 Cum
1 Sqm

4935.06
4380.00
Rs

Rs

4935.06
61.00
230.00
45.84

1 Cum
1 Cum
1 Cum
1 Kg
337269598.xlsx - data-WS

9315.06
1268.25
10583.31
10583.31

1628.57
20.13
75.90
15.18
756.36

Page 326 of 3205

Rs

Rs

4935.06
160.00
45.84

1 Cum
1 Cum
1 Kg

2496.14
339.85
0.00
2835.99

166.56
5.40
115.98
287.94
39.2
327.14

Rs.

Plinth Level : Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse
Crushed Graded Metal including cost and conveyance of all materials like cement, sand,
ges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers,
omplete for finished item of work with nomonal reinforcement for Road restoration.

5.74
1854.81
791.93
77.00
504.00
384.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 Each
1 Each
1 hour

Rs

2296.00
1669.33
356.37
92.40
50.40
533.76
338.60
5336.86
726.61
6063.47

n Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement : fine aggregate: coarse aggregate )
ded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate
ials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
inished item of work with nomonal reinforcement

5.74
1489.81
791.93
77.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1340.83
356.37
92.40
338.60

504.00
384.00

1 day
1 day

50.40
533.76
4606.56
627.18
5233.74

Rs

337269598.xlsx - data-WS

Page 327 of 3205

ement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size
aggregate) from approved quarry including cost and conveyance of all materials like cement,
to site and including Seigniorage charges, sales & other taxes on all materials including all
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
ding centering, shuttering . for RCC SLABS, BEAMS

1854.81
791.93
5.74

1 Cum
1 Cum
1 Cum

1669.33
356.37
2296.00
4321.70

504.00
450.00
384.00

1 Cum
1 Cum
1 Cum

33.77
59.85
960.00
1053.62

338.60
175.40
77.00

1 Cum
1 hour
1 Cum

90.41
46.83
92.40
229.64
5604.96
763.12
6368.08
0.00
6368.08

Rs

Thick

0.15 m

5604.96
152.00
121.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5604.96
1013.84
807.07
161.41
7587.28
1033.01
6803.71
0.00
6803.71

e coat in CM (1:4) finished smooth including cost and conveyance of all materials to site,
ng, scaffolding and all operational, incidental, labour charges etc., including cutting grooves
of work. (As per SS 903). per 10 Sqm.

3045.08

1 Cum

456.76

504.00
384.00

1 Nos
1 Nos

302.40
368.64
1127.80
153.55
1281.35
0.00
1281.35

Rs
337269598.xlsx - data-WS

Page 328 of 3205

ingle coat in CM (1:3) finished smooth including cost and conveyance of all materials to site,
ng, scaffolding and all operational, incidental, labour charges etc., including cutting grooves
of work. (As per SS 903). per 10 Sqm.

3733.88

1 Cum

504.00
384.00

1 Nos
1 Nos

784.11

Rs

473.76
61.44
1319.31
179.62
1498.93
0.00
1498.93

to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof
s green including cost of all materials, seigniorage charges, excluding conveyance charges of
labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding
d item of work

3733.88
52.00

1 Nos
1 Kg

784.11
104.00

504.00
450.00
384.00

1 Nos
1 Nos
1 Nos

332.64
693.00
1420.80
3334.55
454
3788.55
0.00
3788.55

Rs

Rs

of approved quality to give an even shade after thoroughly brushing the surface to remove all
ng cost of all materials, labour charges and incidental such as scaffolding, lift charges etc.,
eyance charges of materials
29.00

1 Kg

58.00
10.00

504.00
384.00

1 Nos
1 Nos

105.84
122.88
296.72
2.97
299.69
40.8
340.49
0.00
340.49

Rs

Rs

mel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost
taxes, incidental, operational and all labour charges etc., complete for finished item of work.

337269598.xlsx - data-WS

Page 329 of 3205

193.00

1 Ltr

135.10

576.00
450.00

1 day.
1 day.

120.96
220.50
0.00
476.56
64.88
541.44
0.00
541.44

Rs

Rs

Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/
eters for RCC works , including labour charges for straightening, cutting, bending to required
cks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG,
d designs and drawings, including cost and conveyance of steel bars, including all wastages
ding cost and conveyance of binding wire, cover blocks and all incidental, operational, labour
tying including sales and other taxes on all materials etc., complete for finished item of work in

34000.00

1 Ton

35700.00

70.00

1 kg

420.00

588.00
384.00

1 day
1 day

5880.00
3840.00
45840.00

1 MT
Sub Total:
Rs.

337269598.xlsx - data-WS

6241.12
52081.12
0.00
52081.12
52.08

Page 330 of 3205

adopting trenchless technology tunneling work through specialized pipe jacking method by
gradient, by hydraulic pipe jacking technique complete including tunneling, excavation in all
RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other
e, in co-ordination with the concerned authorities as per approved drawings and directed by

26000.00
16487.49

1 Rmt
1 Rmt

26000.00
16487.49
42487.49
5784.67
48272.16
0.00
48272.16

27300.00
18408.43

1 Rmt
1 Rmt

27300.00
18408.43
45708.43
6223.20
51931.63
0.00
51931.63

28600.00
20649.08

1 Rmt
1 Rmt

28600.00
20649.08
49249.08
6705.26
55954.34
0.00
55954.34

29900.00
24313.74

1 Rmt
1 Rmt

29900.00
24313.74
54213.74
7381.20
61594.94
0.00
61594.94

31200.00
27454.44

1 Rmt
1 Rmt

31200.00
27454.44
58654.44
7985.80
66640.24
0.00
66640.24

337269598.xlsx - data-WS

Page 331 of 3205

32500.00
29954.67

1 Rmt
1 Rmt

32500.00
29954.67
62454.67
8503.20
70957.87
0.00
70957.87

35100.00
31872.19

1 Rmt
1 Rmt

35100.00
31872.19
66972.19
9118.26
76090.45
0.00
76090.45

39000.00
34119.80

1 Rmt
1 Rmt

39000.00
34119.80
73119.80
9955.26
83075.06
0.00
83075.06

of K7 class as per ISI with spigot and socket ends, with all necessary fittings as per IS 3114,
gs, lowering, laying, jointing and testing to required pressure including cost and conveyance of
plete. ( Rates are inclusive of CP & OH )

1097.16
141.60
32.50
97.94

1512.20
205.86
52.93
121.57

2101.47
250.43
76.95
135.57

1 Rmt
1 No
1 Rmt
1 No

Rs

1097.16
25.77
32.50
17.83
1173.26
0.00
1173.26

Rs

1512.20
37.47
52.93
22.13
1624.73
0.00
1624.73

Rs

2101.47
45.58
76.95
24.67
2248.67
0.00
2248.67

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

337269598.xlsx - data-WS

Page 332 of 3205

2821.63
279.28
103.96
155.06

3647.50
426.13
134.47
178.36

4584.27
538.89
168.65
210.80

5560.29
588.71
205.83
229.96

8009.36
633.29
249.00
263.16

1 Rmt
1 No
1 Rmt
1 No

Rs

2821.63
50.83
103.96
28.22
3004.64
0.00
3004.64

Rs

3647.50
77.56
134.47
32.46
3891.99
0.00
3891.99

Rs

4584.27
98.08
168.65
38.37
4889.37
0.00
4889.37

Rs

5560.29
107.15
205.83
41.85
5915.12
0.00
5915.12

Rs

8009.36
115.26
249.00
47.90
8421.52
0.00
8421.52

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

and fixing 1.50 m long 16mm dia cold twisted deformed steel Anchor rods with 0.75m length
ng length embedded in concrete/ masonry including cost of all materials, machinary, labour,
g hole with thick cement slurry etc, with intial lead up to 50m and all lifts.

38.00

1 Kg

337269598.xlsx - data-WS

900.60

Page 333 of 3205

154.00

1 Rmt

1155.00

97.00

1 Rmt

727.50

588.00
450.00
384.00

1 day
1 day
1 day

294.00
225.00
384.00
3686.10
368.610
368.61
0.00
368.61

Rs
Rs
Rs

337269598.xlsx - data-WS

Page 334 of 3205

m
399.91

1 Rmt

39990.50

120.82
1160.75
68.40

1 Cum
1 Cum
1 Rmt

6645.10
5803.75
6840.00
59279.35
592.79
12.00
604.79
0.00
604.79

with wires including excavation and dismantling of foundation concrete and lines under the
all lifts and upto a lead of 1000 m and stacking the serviceable and unserviceable material
MORD / MORTH.

Nos
450.00
384.00
576.00

1 day
1 day
1 day

0.00
4024.32
1152.00

415.00

1 hour

622.50
5798.82
789.51
6588.33
219.61
0.00
219.61

es coming across the proposed alignment of the pipeline including cost and conveyance of all
219.61
2585.00

1 No
1 No

4138.13
6932.86

1 Cum
1 Cum

219.61
2585.00

869.01
693.29
4366.91
337.2
4704.11

LS

proposed alignment of the pipeline including Earth work excavation, shifting of cables and
120.82

1 Cum

LS

40.78

12.23
53.01

337269598.xlsx - data-WS

Page 335 of 3205

aurd cabins of size 0.90 x0.90 x 0.90 m made with 4 nos vertical and 8 nos horizontal MS flats
at 7.5 cm c/c with door and locking arrangements as per approved drawing and as directed
s with anti corrossive paint two coats over one coat of primery coat including cost of all
e, all taxes and duties,fixing in position duly embedding in CC(1:3:6) prop , and all other
nished item of work.

0.05
0.05

0.90

39.20
39.20
0.89

0.90
0.40
0.40

0.90
0.50
0.50

14.90 Kg
10.98 Kg
48.06 Kg
4.05 Sqm
0.32 Cum
0.32 Cum

38.00
38.00
22.00

1 Kg
1 Kg
1 Kg

983.44
1826.28
1626.68

4.00

1 Kg

325.34
295.76

47.66
139.78
4337.54

59.15
617.67
44.73
1388.01
179.00
7346.06

1 Sqm
1 Cum
1 Cum

1000.17
8346.23
0.00
8346.23

Rs

urd cabins of size 1.50 x 1.50 x 1.50 m made with 4 nos vertical and 8 nos horizontal MS flats
at 7.5 cm c/c with door and locking arrangements as per approved drawing and as directed
s with anti corrossive paint two coats over one coat of primery coat including cost of all
e, all taxes and duties,fixing in position duly embedding in CC(1:3:6) prop , and all other
nished item of work.

0.05
0.05

1.50

39.20
39.20
0.89

1.50
0.40
0.40

1.50
0.60
0.60

24.30 Kg
16.86 Kg
140.18 Kg
11.25 Sqm
0.38 Cum
0.38 Cum

38.00
38.00
22.00

1 Kg
1 Kg
1 Kg

1564.08
5326.84
3989.48

4.00

1 Kg

797.90
725.36

47.66
139.78
4337.54

1 Sqm
1 Cum
1 Cum

337269598.xlsx - data-WS

145.07
617.67
53.11
1648.27
372.00
15239.78

Page 336 of 3205

Rs

337269598.xlsx - data-WS

2074.90
17314.68
0.00
17314.68

Page 337 of 3205

mains where ever required (.Dia of pipes in mm.)

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

1 day
1 day

Rs

27.00
23.04
50.04
6.81
56.85
0.00
56.85

Rs

36.00
30.72
66.72
9.08
75.80
0.00
75.80

Rs

49.50
42.24
91.74
12.49
104.23
0.00
104.23

Rs

67.50
57.60
125.10
17.03
142.13
0.00
142.13

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

337269598.xlsx - data-WS

90.00
76.80
166.80
22.71
189.51
0.00

Page 338 of 3205

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

Rs

189.51

Rs

112.50
96.00
208.50
28.39
236.89
0.00
236.89

Rs

135.00
115.20
250.20
34.06
284.26
0.00
284.26

Rs

157.50
134.40
291.90
39.74
331.64
0.00
331.64

Rs

180.00
153.60
333.60
45.42
379.02
0.00
379.02

Rs

202.50
172.80
375.30
51.1
426.40
0.00
426.40

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

337269598.xlsx - data-WS

225.00
192.00
417.00
56.77
473.77

Page 339 of 3205

450.00
384.00

486.00

499.00

537.00

572.00

642.00

714.00

787.00

Rs

0.00
473.77

Rs

270.00
230.40
500.40
68.13
568.53
0.00
568.53

Rs

486.00
66.17
552.17
0.00
552.17

Rs

499.00
67.94
566.94
0.00
566.94

Rs

537.00
73.11
610.11
0.00
610.11

Rs

572.00
77.88
649.88
0.00
649.88

Rs

642.00
87.41
729.41
0.00
729.41

Rs

714.00
97.21
811.21
0.00
811.21

1 day
1 day

1 No

1 No

1 No

1 No

1 No

1 No

1 No

337269598.xlsx - data-WS

787.00
107.15
894.15

Page 340 of 3205

Rs

337269598.xlsx - data-WS

0.00
894.15

DATA FOR PUMP SETS


S.No.

Description of work

Unit

Rate

Supply, delivery, erection of water lubricating type Vertical Turbine Pump electrical driven capable to Discharge 78
total head of 44 meters make M&M/M&P/Flowmore/ Jyoti/Kirloskar or any other make having ISO 9001 certifi
column assembly fitted with bronze impellers complete with water lubrication system, bell mouth strainer, suitable
cost of material, duties, labour excluding VAT Complete (2+1 stand by system) column length 10 Mtrs.

Rate as per Quotation

1 No

669725

Overheads & Contractors Profit


Rate per 1 No.

Supply, delivery of 55 KW/75hp Vertical solid shaft squirrel cage induction motor, A.C. power supply 1500 (syn R
above VT pumps including cost of materials, duties, labour charges and all other incidental charges, exc
ABB/Cromptom/GEC/Jyothi or any other make of ISO 9001 Certification.

Rate as per Quotation

1 No

337980

Overheads & Contractors Profit


Rate per 1 No.

Supply, delivery of mounting base over MS Girder suitable to lay on jack well to mount the pumps, including th
duties, labour charges and all other incidental charges, excluding VAT. Complete as directed excluding VAT.

Rate as per Quotation

1 No

120000

Overheads & Contractors Profit


Rate per 1 No.

Supply, delivery of 50 sqmm 3.5 core PVC insulated aluminum armored cable starter to motor including cost
labour and all other incidental charges, excluding VAT.
Basic rate as per Elec. SSR - code ELEC-4.1.27
Overheads & Contractors Profit
Rate per 1 No.

1 Rmt

261.00

14%

Manufacturing and supply of control panel board with 400 Amps capacity bus bar suitable to operate 3 pump sets.
are internally Wired and necessary earthling terminations. The panel board is made of 16 gauge MS sheet met
indoor type and duly painted with 2 coats enamel paint with cost of materials as follow conveyance, duties, lab
other incidentals, excluding VAT.
a) 400A capacity MCCB for incoming supply manual operated, 3pole.Thermal magnetic O/L and E/F releases. --- 1
b) Fully automatic Air Break type star delta starters L&t/Schnieder/BCH. --- 3 Nos.
c)160 Amps MCCB for starter controlling. --- 3Nos.
d) 6x10KVAR capacitor bank.---- 1 No. HRC fuses for capacitor control. --- 3 Nos
e) 63Amps TPN switch HRC type with
f) 0-500 V Electronic Volt meter with selector switch with C.T.Coils to read allphases 1 No.
g) 0-400Amp Electronic Ammeter with selector switch. --- 1 No.
h) 0-150Amp Manual Ammeter for each individual Motor reading.--- 3Nos.
i) 63 Amps TPN switch HRC type for spare/Lighting. ---- 1 Nos
j) Hour meter Electric/Electronic 5 digit magnetic counter to read number of hours the pumps worked--- 3 Nos
k) RYB Push buttons with RGY for start & stop for Pumps. --- 6 Nos.
l) RYB Phase indicating of incoming supply.--- 3 Nos.

S.No.

Description of work
Rate as per Quotation
Overheads & Contractors Profit
Rate per 1 No.

Overheads & Contractors Profit


Rate per 1 No.

0%

1 No

9600.00

0%

3 Tonne Capacity ( Rate as per Maharastra ( MJP Elec & Mech.


CSR-2012-13 - section -4, LF 1-3 )

1 No

21841.00

Erection charges
3 Ton capacity Travelling Trolley ( Rate as per Maharastra ( MJP
Elec & Mech. CSR-2012-13 - section -4, LF 2-3 )

1 job
1 No

291.00
16863.00

Erection charges

1 job

194.00

Add for change of SSR @

10%

c.Overheads & Contractors Profit

14%
0%

Manfacture, Supply and delivery of Cast Carbon Steel Bolted Cover Non Return Valve as per IS:5312/Part 1/1984
duty material spec. As per IS:1030/1989 with SS Hinge &Seat Rings.including transporation, Central Exercise du
complete - 250mm dia- PN-20
Rate as per Valves data-Sn.4
Overheads & Contractors Profit
Rate per 1 No.

422400.00

Supply, delivery and erecting of 3 Ton capacity chain pully block with moving trolley suitable to mount on top Girde
motor in the pump house, including cost of material, conveyance, duties, labour charges and all other incidental
required lift, tested to 50% over load as per IS 3832 carrying ISI mark.

Overheads & Contractors Profit


Grand Total
Rate per Each

1 No

Rate

Supply, laying and fixing of 40x 6mm GI Flat Patti Double earthling for electrical protection for motor pump and pa
earthed duly providing earth pits and filling coal and salt and GI Pipe 1 x6 long and bottom 2x2 G.I plate wie
and specifications with cost of materials, conveyance, duties, labour charges and providing 1 x 1 earth pit
masoning with top cover excluding VAT.

Rate as per Quotation

Unit

1 No

77349.96

0%

Manufacture,supply and delivery of cast carban steel rising/Non raising spindle sluice valves design standard as
for water supply scheme with ss spindle & ss working parts the grade of cast steel for body Bonnet, Dome,
Stuffing box, gland Thrust Plate, Shall be as per IS:1030/1989.(The valve shall be used for High presure schmes
excluding transporation, Central exise duty and sale tax etc., complete. ISI Marked- 250mm dia - PN- 25

Rate as per Valves data-Sn.8-c


Overheads & Contractors Profit
Rate per 1 No.

1 No
0%

111897.24

S.No.

10

Description of work

Overheads & Contractors Profit


Rate per 1 No.

Overheads & Contractors Profit


Rate per 1 No.

0%

1 set

31200.00

0%

1 set

27000.00

Overheads & Contractors Profit


0%
Rate per 1 No.
Supply of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification co
(Part - I) of makes Polycab / RPG /Finolex/ Havells / Paragon / V-Guard / Fortune Art / Gloster/ Suncab.
Rate as per -ELEC-4.1.26
Overheads & Contractors Profit
Rate per 1 No.

14

120815.43

Supply and delivery of necessary safety equipments as per IE rules excluding VAT.
a) Fire Extinguishers 2 kg capacity Co2 -- 2Nos.
b) Rubber matt 6x4. 2 Nos.
c) Fire buckets with stand and three buckets1No.
d) Rubber hand gloves.1 Set.
e) Danger board plates. 4Nos.
f) First aid lit with chart.1No.
g) Shock treatment chart. 1No.
h) Portable rechargeable torch light.1No.

Rate as per Quotation

13

1 No

Supply and delivery of necessary and suitable erection tools excluding VAT.
a) Ring spanner set 3/16 to 1
-- 1No
b) Double end spanner set 3/16 to 1 --1No
c) Pipe wrench 18 & 4 -- 2 Nos
d) Screw drivers 6, 10& 12 3 Nos.
e) Cutting plier 12 1No.
f) 2 kgs Hammer with handle. 1No.
g) Nose plier.1 No.
h) Flat & Half roung smooth file.2Nos.
i) Adjustable spanner6. 1No.
j) Gland tightening spanner. 1 No.
k) Grease gun- 1No.

Rate as per Quotation

12

Rate

Manufacture and supply of Air Release Vacuum Break Surge Alleviation Valve for potable water. Construction
Body of Ductile Iron GGG-50/SG-500-7, Three cylindrical Floats of High Density Poly Ethylene. Baffle Plate, Or
construction bolts of stainless steel, coating internally and externally. Electrostatically applied epoxy (1) Flange c
1538, (2) Female (BSP/NTP Threaded for sizes 25 mm - 100mm dia (PN-16)
Rate as per Valves data-Sn.8-c

11

Unit

1 Rmt

280.00

14%

Fabrication & fixing of 600 mm dia MS barrel Manifold of 4 Mtrs fabricated with 10mm thick MS sheet and prov
connecting vents including cost of MS plate, fabrication charges, wielding and transportation charges and two co
epoxy black paint and all other incidentals excluding VAT.
Rate as per 600mm dia MS pipe data
Overheads & Contractors Profit

1 Rmt
0%

10394.22

S.No.

Description of work

Unit

Rate

Rate per 1 No.

15

Manufacture, supply, delivery of 250mm dia MS pipe for delivery connection including cost of MS plate with 10m
wielding charges painting with 3 coats of epoxy paint, transportation charges, excluding VAT.
Rate as per 250mm dia MS pipe data ( 3x5m)
Overheads & Contractors Profit
Rate per 1 No.

16

Overheads & Contractors Profit


Rate per 1 No.

0%

1 Nos

1197.00

14%

Supply of 240 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification co
(Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / V-Guard / Fortune Art / Gloster. for incoming Sup
to panel board excluding VAT.
Rate as per -ELEC-4.1.43
Overheads & Contractors Profit
Rate per 1 No.

18

4562.66

Manufacture, supply, delivery of MS flanges 250mm dia with 20mm thick MS plate including cost of MS plate fabri
bolts & washers, packing, wielding charges, transportation charges etc. excluding VAT.
Rate as per 250mm dia MS Flanges

17

1 Rmt

1 Nos

439.00

14%

Manufacture, supply, delivery of 400mm dia MS pipe for pressure main connection including cost of MS pla
fabrication, wielding charges painting with 3 coats of epoxy paint, transportation charges, excluding VAT.
Rate as per 400mm dia MS pipe data
Overheads & Contractors Profit
Rate per 1 No.

1 Rmt
0%

7016.43

Per

Amount

n capable to Discharge 78 LPS/4680 LPM at a


e having ISO 9001 certification with requires
ll mouth strainer, suitable base plate including
ngth 10 Mtrs.

1 No

669725
Rs

0
669725.00

power supply 1500 (syn Rpm) suitable for the


r incidental charges, excluding VAT. Make:

1 No

337980
Rs

0
337980.00

nt the pumps, including the cost of materials,


cted excluding VAT.

1 No

120000
Rs

0
120000.00

to motor including cost of materials, duties,

1 Rmt

261.00
Rs

35.54
296.54

e to operate 3 pump sets. The accessories all


f 16 gauge MS sheet metal Cubical/industrial
w conveyance, duties, labour charges and all

O/L and E/F releases. --- 1No.

o.

mps worked--- 3 Nos

Per

Amount

1 No

422400.00
Rs

0
422400.00

on for motor pump and panel board efficiently


bottom 2x2 G.I plate wielded as per IE rules
iding 1 x 1 earth pit chamber with brick

1 No

9600.00
Rs

0
9600.00

able to mount on top Girders to handle pump &


es and all other incidental charges suitable for

1 No

21841.00

1 job

1 No

291.00
16863.00

1 job

194.00
39189.00
3919.00

Rs

5336.000
48444.00
0.00
48444.00
48444.00

as per IS:5312/Part 1/1984.Round body heavy


ation, Central Exercise duty and sale tax etc.,

1 No

77350.00
Rs

0
77350.00

alves design standard as per IS:14846/2000


for body Bonnet, Dome,Stool cover, Wedge
for High presure schmes &pumping stations)
mm dia - PN- 25

1 No

111897.00
Rs

0
111897.00

Per

Amount

otable water. Construction material Cylindrical


Ethylene. Baffle Plate, Orifice venture and all
pplied epoxy (1) Flange connection as per IS

1 No

120815.00
Rs

1 set

0
120815.00

31200.00
Rs

1 set

0
31200.00

27000.00

0
Rs
27000.00
ble as per specification confirming to IS:7098
oster/ Suncab.

1 Rmt

280.00
Rs

39.2
319.20

thick MS sheet and providing 3 Nos delivery


tation charges and two coats of anti corrosive

1 Rmt

10394.00
0

Per

Amount
Rs

10394.00

cost of MS plate with 10mm thick fabrication,


VAT.

1 Rmt

4563.00
Rs

0
4563.00

ding cost of MS plate fabrication charges, nuts

1 Nos

1197.00
Rs

167.58
1364.58

ble as per specification confirming to IS:7098


Gloster. for incoming Supply from transformer

1 Nos

439.00
Rs

61.46
500.46

including cost of MS plate with 10mm thick


excluding VAT.

1 Rmt

7016.00
Rs

0
7016.00

Standard Data - Electrical Items For Buildings


Indexcode

BLD-ELEC-1-4

BLDELEC-1

Description

Spe No.

Conduit Laying

MS / PVC / Trunks Coduit Laying

1.4
1.4.2

(a)

ELEC-1.2.4
ELEC-8.1.10
ELEC-1.2.34
ELEC-1.2.44

Unit

Qty

P.V.C. Conduit (Concealed)


Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI
MARK) concealed in wall with all required accessories
including masonary work and labour charges etc., complete.
Taking Output = 100 M
a) Material
25mm dia 2mm thick PVC pipe,
U' Links,
25mm 1,2,3, & 4 way Junction boxes,
25mm PVC Bends,
Cement
b) Labour charges :
Skilled Electrician
Semi skilled Electrician
Helpers
Mason Ist class
Sundries
C) Cost for 100 RM
add for over heads @
Sub Total
Add VAT @
Add Labour Cess @
Total

100 m
100 M
100 Nos
Each
Each
kg

100 m
200 Nos
12 Nos
12 Nos
50 Kg

day
day
day
day

2 day
2 day
2 day
2 day

14%
0%
0%

Rate per Metre = C/100


(b)

ELEC-1.2.3
ELEC-8.1.10
ELEC-1.2.34
ELEC-1.2.44

Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI
MARK) concealed in wall with all required accessories
including masonary work and labour charges etc., complete.
Taking Output = 100 M
a) Material
25mm dia 1.5mm thick PVC pipe,
U' Links,
25mm 1,2,3, & 4 way Junction boxes,
25mm PVC Bends,
Cement
b) Labour charges :
Skilled Electrician
Semi skilled Electrician
Helpers
Mason Ist class
Sundries
C) Cost for 100 RM
add for over heads @
Sub Total

100 m
100 M
100 Nos
Each
Each
kg

100 m
200 Nos
12 Nos
12 Nos
50 Kg

day
day
day
day

2 day
2 day
2 day
2 day

14%

Add VAT @
Add Labour Cess @
Total

Rate per Metre = C/100

0%
0%

ELEC-1.2.4
ELEC-1.2.39
ELEC-1.2.44

Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI
MARK) concealed in Roof Slabs with all required accessories
including masonary work and labour charges etc., complete.
Taking Output = 100 M
a) Material
25mm dia 2mm thick PVC pipe,
25mm dia 1,2,3 & 4 way deep Junction Box,
25mm PVC Bends,
b) Labour charges :
Skilled Electrician
Semi skilled Electrician
Helpers
Sundries
C) Cost for 100 RM
add for over heads @
Sub Total
Add VAT @
Add Labour Cess @
Total

100 m
100 M
Each
Each

100 m
12 Nos
12 Nos

day
day
day

2 day
2 day
2 day

14%
0%
0%

BLD-ELEC-2-1

Rate per Metre = C/100

2
2.1
2.1.2

Note : 1. If 25mm dia PVC / MS pipes are used for light / fan
point, add the cost of sheet metal / well seasoned wooden
board / box.

Wiring - (BLD-ELEC-2 )

Copper Wiring
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated
F.R flexible copper cable (ISI MARK) in existing pipe with 6A
switch, Ceiling rose and 3mm thick hylam sheet covering to
switch control box including all labour charges etc., complete
for light, bell, fan and exhaust fan points in Residential
Buildings.
Taking Output = 7 Points

ELEC-1.5.1
ELEC-1.7.1

ELEC-1.4.19

a) Material
14/0.3mm PVC FR flexible copper wire,
6A Switch,

7 Point
s

100 M
each

100 m
7 Nos

6A 2 way Ceiling Rose, ELEC-1.7.15

each

7 Nos

25 x 20 cms (10" x8") Hylam sheet 3mm thick,

sqm

0.05 Nos

day
day
day

0.70 day
1.40 day
0.70 day

b) Labour charges :
Skilled Electrician
Semi skilled Electrician
Helpers
C) Cost for 7 Points
add for over heads @
Sub Total
Add VAT @
Add Labour Cess @
Total

Rate per Point = C/7

14%
0%
0%

2.1.4

Supply and fixing of 6A 3 pin wall plug socket with 6A switch


control on a common switch board with earth continuity
including wire leads, earth connections along with all labour
charges etc., complete.

ELEC-1.7.4

Taking Output = each


a) Material
6A 3 pin / 2 Pin Socket,

each

1 Nos

ELEC-1.7.1

6A Switch,

each

1 Nos

day
day

0.067 day
0.067 day

b) Labour charges :
Skilled Electrician
Helpers

1 No

BLD-ELEC-3-1

add for over heads @


Sub Total
Add VAT @
Add Labour Cess @
Total
3

Rate per each


RUN OF MAINS - ( BLD-ELEC-3 )

3.1

Wiring with F.R P.V.C. insulated flexible copper cable

3.1.1

Supply and run of 2 of 14/0.3mm (1.0 Sq.mm) F.R P.V.C.


insulated flexible copper cable in existing pipe for mains
inlcuding all labour charges etc., complete.

ELEC-1.5.8

Taking Output = 100 M


a) Material
14/0.3mm FR PVC copper wire,
b) Labour charges :
Skilled Electrician
Semi Skilled Electrician
Helpers
Sundries
C) Cost for 100 RM
add for over heads @
Sub Total
Add VAT @
Add Labour Cess @
Total

14%
0%
0%

100 m
100 M

day
day
day

200 m

0.67 day
2.00 day
0.67 day

14%
0%
0%

Rate per Metre = C/100


3.1.2

ELEC-1.5.8

Note : Labour Charges considered for 150 M / day


Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.
insulated flexible copper cable in existing pipe for earth
continuity including all labour charges etc., complete.
Taking Output = 100 M
a) Material
14/0.3mm FR PVC copper wire,
b) Labour charges :
Skilled Electrician
Semi Skilled Electrician
Helpers

100 m
100 M

day
day
day

100 m

0.34 day
1.00 day
0.34 day

Sundries
C) Cost for 100 RM
add for over heads @
Sub Total
Add VAT @
Add Labour Cess @
Total

Rate per Metre = C/100


Note : Labour Charges considered for 150 M / day

14%
0%
0%

3.1.4

ELEC-1.5.10

Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C.


insulated flexible copper cable in existing pipe for mains
inlcuding all labour charges etc., complete.
Taking Output = 100 M
a) Material
36/0.3mm (2.5 sqmm) FR PVC copper wire,
b) Labour charges :
Skilled Electrician
Semi Skilled Electrician
Helpers
Sundries
C) Cost for 100 RM
add for over heads @
Sub Total
Add VAT @
Add Labour Cess @
Total

100 m
100 M

day
day
day

200 m

0.67 day
2.00 day
0.67 day

14%
0%
0%

Rate per Metre = C/100


Note : Labour Charges considered for 150 M / day
4

SWITCH GEAR & MCB DISTRIBUTION BOARDS.


(BLD-ELEC-4)

4.1

Panel Mounting Cubical type SDF


Supply and erection of Panel mounting cubical type 30 / 32A
TPN 415V, 50 Hz. switch disconnector fuse unit complete with
front drive mechanism with door inter lock, padlocking
arrangement etc., complete with fuse links on existing control
panel.

4.1.1

ELEC-2.4.2

Taking Output = each


a) Material
30 / 32A TPN 415V, 50 Hz. switchs Disconnector fuse unit with
HRC fuses.
b) Labour charges :
Skilled Electrician
Semi Skilled Electrician
Helpers
Sundries such as hardware etc.,

1 No
each

1 Nos

day
day
day
LS

0.167 day
0.167 day
0.333 day

add for over heads @


Sub Total
Add VAT @
Add Labour Cess @
Total

14%
0%
0%

Rate per each


Note : Labour Charges considered for 6 jobs / day
5

EARTHING - (BLD-ELEC-5)

5.1

EARTHING
Providing independent earthling by excavating a trench to a
depth of 2.1 M in all soils, as per size specified in the Data,
using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with
necessary accessories with hume pipe ring duly providing
staggered holes including filling with equal proportion of Salt
and Charcoal in layers and all labour charges etc., complete
for small quarters.

BLD-ELEC-5-1

5.1.1

a) Material
Earth Work Excavation of Hard gravel Soil with small boulder
for trench 1st step of size 1.5 x 0.6 x 0.9 m (5'x2'x3') - Sump

cum

0.85 cum

Electrical Items For Buildings


Rate Rs.

Per

Amount Rs.

31.80
44.00
19.00
6.00
6.80

1m
100 Nos
1 Nos
1 Nos
1 Kg

3180.00
88.00
228.00
72.00
340.00

576.00
450.00
450.00
504.00

1 day
1 day
1 day
1 day

1152.00
900.00
900.00
1008.00
0
7868.00
1101.52
8969.52
0.00
0.00
8969.52

89.70

172.00
44.00
19.00
6.00
6.80

1m
100 Nos
1 Nos
1 Nos
1 Kg

17200.00
88.00
228.00
72.00
340.00

576.00
450.00
450.00
504.00

1 day
1 day
1 day
1 day

1152.00
900.00
900.00
1008.00
21888.00
3064.32
24952.32

0.00
0.00
24952.32

249.52

31.80
61.00
6.00

1m
100 Nos
1 Nos

3180.00
7.32
72.00

576.00
450.00
450.00

1 day
1 day
1 day

1152.00
900.00
900.00
6211.32
869.58
7080.90
0.00
0.00
7080.90

70.81

1051.00
18.00

100 m
1 Nos

1051.00
126.00

21.00

1 Nos

147.00

73.00

1 Nos

3.65

576.00
450.00
450.00

1 day
1 day
1 day

403.20
630.00
315.00
2675.85
374.62
3050.47
0.00
0.00
3050.47

435.78

27.00

1 Nos

27.00

18.00

1 Nos

18.00

576.00
450.00

1 day
1 day

38.59
30.15
113.74
15.92
129.66
0.00
0.00
129.66

129.66

72.00

576.00
450.00
450.00

100 m

1 day
1 day
1 day

144.00

385.92
900.00
301.50
1731.42
242.40
1973.82
0.00
0.00
1973.82

19.74

72.00

576.00
450.00
450.00

100 m

1 day
1 day
1 day

72.00

195.84
450.00
153.00

870.84
121.92
992.76
0.00
0.00
992.76

9.93

2510.00

576.00
450.00
450.00

100 m

1 day
1 day
1 day

5020.00

385.92
900.00
301.50
6607.42
925.04
7532.46
0.00
0.00
7532.46

75.32

7006.00

1 Nos

7006.00

576.00
450.00
450.00

1 day
1 day
1 day

96.19
75.15
149.85
35.03
7362.22
1030.71
8392.93
0.00
0.00
8392.93

8392.93

139.78

1 cum

118.81

Page 361 of 3205

Kandukur Municipality
DATA BASED ON - 2015 - 2016 SSR
20/02/16

Chapter - 5
BASES AND SURFACE COURSES (BITUMINOUS)
Indexcode

S. No

RBRFNDN-2

Description

Unit

RBR-FNDN-2: Collection ,Supply and filling of Stone dust from approved quarry to work site and s
gauge for premeasurements
including cost and convenyance of all material and all labour ch
standard specifications. Clause 305.3.9 MORD & 304 MORTH
Output

Stone dust Filling


a) Material
Stone dust

Cum

b)Labour
Mate
Mazdoor (Unskilled)

day
day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT, labour cess and variation of material cost etc,.
Rate per 1 Cum
RBRFNDN-4

RBR-FNDN-4 : Providing concrete for plain/reinforced concrete in open foundations using 40 mm


stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including c
as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700
II P.C.C grade M 15 (MORD)
iii Nominal mix (1:2.5:5) (Mechanical Mixer)
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity

Output

t
cum
cum
cum
cum
day
day
day
hour

d) Formwork @ 4% on cost of material, labour and machinery


(a+b+c)
e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f
VAT, labour cess and variation of material cost etc,.

0%

Rate per 1 Cum

Note : Needle Vibrator is an item of minor T & P which is already included in overhead charge
analysis of cement concrete works.

Restore - data 337269598.xlsx

Page 362 of 3205

Restore - data 337269598.xlsx

Page 363 of 3205

II WBM Grading 2
(i) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound maca
spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages t
applying and brooming, stone screening/binding materials to fill-up the interstices of coarse
compacting to the required density grading 2 as per Technical Specification Clause 405 MORD / 40
thickness of 75 mm.
By Manual Means
Unit = cum
Taking output = 360 cum
a)Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour for Rural
Area works
Water tanker 6 kl capacity
c) Material (Refer Tables 400.7, 8, 9 and 10 MORD/ 400.6, 7, 8 & 9
MORTH)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm for compacted
thickness of 75 mm
Stone Screening
Type B 13.2 mm for Grading 2 @ 0.12 cum per 10sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading 2 material
Water

day
day
day
hour
hour

cum

cum
cum
kl

d&e) Overheads & Contractors Profit


Using 13.2 mm for Grading 2
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
VAT, labour cess and variation of material cost during the execution
etc,.
Rate per 1 Cum

Restore - data 337269598.xlsx

Page 364 of 3205

MINOUS)
Quantity

Rate Rs.

Amount Rs.

ved quarry to work site and stacking at work site to Dept.


all material and all labour charges etc. complete as per

6 Cum
6.00

1001.81

6010.86

0.00
0.31

450.00
384.00

0.00
119.04
6129.90
834.59
6964.49
1160.75
0.00

13.62%

1160.75

pen foundations using 40 mm nominal size Graded hard


pacted by vibration including curing for 14 days complete
1203 MORD and 1500, 1700 & 2100 MORTH.

1 Cum

0.275
0.48
0.48
0.24
0.08

5740.00
791.93
1489.81
2009.81
1579.81

1578.50
380.13
715.11
482.35
126.38

0.10
1.39

504.00
384.00

50.40
533.76

0.40

338.60

135.44
4002.07
160.08

4.00%

13.62%

4162.15
566.68
4728.83
0.00

4728.83
included in overhead charges. Hence not added in rate

Restore - data 337269598.xlsx

Page 365 of 3205

Restore - data 337269598.xlsx

Page 366 of 3205

ific sizes to water bound macadam specification including


eel roller 80-100 kN in stages to proper grade and camber,
up the interstices of coarse aggregate, watering and
cation Clause 405 MORD / 404 MORTH. For compacted

12.08
250.00

450.00
384.00

5436.00
96000.00

36.00

1101.00

39636.00

24.00

865.50

20772.00

435.60

1306.81

569246.44

57.60

1741.81

100328.26

28.80

306.76

8834.69

144.00

103.00

14832.00
855085.39
119711.95
974797.34
2707.77
0.00
2707.77

Restore - data 337269598.xlsx

S.N

Ref. to SSR
Code

Description

Qty

Rate

Unit

BMW-A.01: Supplying, laying, jointing and testing 101.6 mm


SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1.5:1 prop. Including excavation of
trenches and socket pits in any soil (except rock requiring
blasting) up to 1524 mm(5'0") depth and refilling with watering
and tamping.

BMW-A.01
BMW-A.06

101.60 mm (4") dia SWG pipe upto 5' depth


Rate as per SSR
labour charges only for laying, jointing and testing SWG pipes

1 Rmt
Err:520

Over heads and Contractors profit @


Total

466.00
268.00

Err:520
Rate per 1 Rmt

BMW-A.02: Supplying, laying, jointing and testing 101.6 mm


SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1:5:1 prop. including excavation of
trenches and socket pits in any soil (except rock requiring
blasting) up to 914.4 mm (3'0") depth and refilling with watering
and tamping.

BMW-A.02
BMW-A.05

101.60mm (6") dia SWG pipe upto 3' depth


Rate as per SSR
labour charges only for laying, jointing and testing SWG pipes

1 Rmt
130.00
Err:520
SS RATE FOR

Over heads and Contractors profit @


Total

Err:520
Rate per 1 Rmt

BMW-A.03: Supplying, laying, jointing and testing 152.4 mm


SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1.5:1 prop. including excavation of
trenches and socket pits in any soil (except rock requiring
blasting) up to 1524 mm(5'0") depth and refilling with watering
and tamping.

BMW-A.03
BMW-A.06

152.4 mm (6") dia SWG pipe upto 5' depth


Rate per 1 RM
labour charges only for laying, jointing and testing SWG pipes

Over heads and Contractors profit @


Total

680.00
5.00

Err:520
Rate per 1 Rmt

1 Rmt
Err:520

BMW-A.04: Supplying, laying, jointing and testing 152.4 mm


SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1.5:1 prop. including excavation of
trenches and socket pits in any soil (except rock requiring
blasting) up to 914.4 mm (3'0") depth and refilling with watering
and tamping.

BMW-A.04
BMW-A.05

152.4 mm (6") dia SWG pipe upto 3' depth


Rate per 1 RM
labour charges only for laying, jointing and testing SWG pipes

1.00 Rmt
Err:520

Over heads and Contractors profit @


Total

614.00
216.00

Err:520
Rate per 1 RM

BMW-A.07: Supplying , laying, jointing and testing 152.4 mm CC


bed 1:2:4 Prop: using 19.05 mm gauge graded granite metal
chips and cradling 101.6 mm SWG pipe line all round to have
76.2 mm thick cover over the sockets.
BMW-A.07
BMW-A.08

SSR item No.


labour charges only
Total
Over heads and Contractors profit @ 14%
Total

1.00 Rmt
Err:520

126.00
10.00

Err:520
Rate per 1 RM

BMW-A.08: Supplying, laying, jointing and testing 152.4 mm CC


bed 1:2:4 Prop: using 19.05 mm gauge graded granite metal
chips and cradling 152.4 mm SWG pipe line all round to have
76.2 mm thick cover over the sockets.
BMW-A.09
BMW-A.10

SSR item No.


Add Municipal allowance on Labour componentTotal
Over heads and Contractors profit @ 14%
Total

1.00 Rmt
Err:520

217.00
49.00
Err:520

Rate per 1 RM
7

BMW-B.01: Constructing 904.0 mm (30) dia solid block


masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using fly-ash blocks of 225 mm thick
from approved source having a minimum crushing strength of 10
N/sq.mm including plastering with cement mortar 1:3 prop;
thick both inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a depth of 904
mm (3'-0") in all sorts of soils (excluding rock) and laying cement
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and
P.C.C. 1:2:4 benching and channel 100 mm thick as per
Standard specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of
seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.

chamber 3' dia and upto 3' depth - Fly- ash bricks
BMW-B.01

Rate as per SSR item Over heads and Contractors profit @ 14%
Total

1 No.

Rate per 1 No

6530.00
Err:520

1
1

BMW-B.02: Constructing 904.0 mm (30) dia solid block


masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using fly-ash blocks of 225 mm thick
from approved source having a minimum crushing strength of 10
N/sq.mm including plastering with cement mortar 1:3 prop;
thick both inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a depth of
1524 mm (5'-0") in all sorts of soils (excluding rock) and laying
cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal
and P.C.C. 1:2:4 benching and channel 100 mm thick as per
Standard specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of
seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.

chamber 3' dia and upto 5' depth - Fly- ash bricks
BMW-B.02

Rate as per SSR item Over heads and Contractors profit @ 14%
Total

1 No.

10218.00
Err:520

1 No.

6237.00
Err:520

Rate per 1 No
9

BMW-B.03: Constructing 904.0 mm (30) dia brick masonry


inspection chamber as per IS - 4111: Part-1:1986 with cement
mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick
from approved source having a minimum crushing strength of 5
N/sq.mm including plastering with cement mortar 1:3 prop;
thick both inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a depth of 904
mm (3'-0") in all sorts of soils (excluding rock) and laying cement
concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and
P.C.C. 1:2:4 benching and channel 100 mm thick as per
Standard specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of
seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.

chamber 3' dia and upto 3' depth - Clay bricks


BMW-B.03

Rate as per SSR item


Over heads and Contractors profit @ 14%
Total
Rate per 1 No

10

BMW-B.04 : Constructing 904.0 mm (30) dia brick masonry


inspection chamber as per IS - 4111: Part-1:1986 with cement
mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick
from approved source having a minimum crushing strength of 5
N/sq.mm including plastering with cement mortar 1:3 prop;
thick both inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a depth of
1524 mm (5'-0") in all sorts of soils (excluding rock) and laying
cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal
and P.C.C. 1:2:4 benching and channel 100 mm thick as per
Standard specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of
seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar,
constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.

chamber 3' dia and upto 5' depth - Clay bricks


BMW-B.04

Rate as per SSR item Over heads and Contractors profit @ 14%
Total

1 No.

9651.00
Err:520

1 No.

6091.00
Err:520

1 No.

513.00
Err:520

1 No.

2701.00
Err:520

Rate per 1 No
11

BMW-B.05: Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick


in CM 1:6 prop. Masonry Inspection chamber up to 914.4 mm
(3'0") and fitted with light weight 914.4 mm x 457.2 mm
(3'0"x1'6") C.I frame and cover of 40 Kg.
BMW-B.05

Rate as per SSR item Over heads and Contractors profit @ 14%
Total
Rate per 1 No

12

BMW-B.06: Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick


in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm
(3'0") and fitted with light weight 457.2 mm x 457.2 mm
(1'6"x1'6") C.I frame and cover of 20 Kg.
BMW-B.06

Rate as per SSR item Over heads and Contractors profit @ 14%
Total
Rate per 1 No

14

BMW-A.72: Supplying & fixing 150 mm x 100 mm SWG gully


traps conforming to ISI 651 & 4127 with C.I Grating & Cost.
Brick masonry in CM 1:6 prop. Intermediate chamber and fitted
with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

BMW-A.72

Rate as per SSR Item No.72


Over heads and Contractors profit @ 14%
Total
Rate per 1 No

15

BMW-C.41: Supplying & fixing CI Nahany traps 1st quality ISI


marked conforming to IS:1729-1979 with C.P. Grating fixing with
white cement as per site requirements with standard practice for
100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs

BMW-C.41
BMW-C.42

Rate as per SSR item-126, Pg.90 Add Municipal allowance on Labour

1 No.
Err:520

Over heads and Contractors profit @ 14%


Total

931.00
410.00
Err:520

Rate per 1 No

17

Providing and fixing 23" (584.2mm) long white glazed Indian WC


Orissa pan of parry/Neycer/HSW make with P or S trap with
brick masonry seat, CC squatting plate as approved by
Engineer-in-charge, W.C. shall be encased on CC (1:2:4) 6
alround well above the joint to stop leakage at the joint etc.,
complete including cost and conveyance of all materials to site,
cost of CC bed, labour charges and segniorage charges etc.,
complete for finished item of work.

BMW-D.01
BMW-D.06

Without Flush tank (General Toilets)


Cost of 584.2mm(23") Orissa pan
Add Municipal allowance on Labour -SSR item-138

BMW-D.09
BMW-D.10

Cost of Brick masonry seat


Cost of C C squatting plate
Over heads and Contractors profit @ 14%

1 No.
Err:520

55.00
652.00

1 No.
1 No.

953.00
281.00

1
1

Err:520

1419.40

Rate per 1 No
40

S & F tested NP bib taps at all levels of size 12.70mm dia of


Indian make first quality including cost and conveyance of all
materials, labour charges etc., complete for finished item of work
in all floors.(LONG )

BMW-E.09

250 gms
12.7 mm N.P bib tap heavy duty - SSR S.No.182

BMW-E.10

Labour charges only

Err:520

542.00

Over heads and Contractors profit @ 14%

Err:520

137.40

1.00 RM
Err:520

41.00
350.00

Err:520

111.00

1.00 RM
Err:520

350.00
41.00

Err:520

358.20

1 No.

29.00

Rate per 1 No
44

Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI


mark in ground or on wall including cost of tees, elbows, bends,
reducers, couplings, running joints, union flanges, unions etc.
with necessary excavation in all types of soils except rock
requiring blasting, refilling, chasing masonry walls and making
good the walls & floors to the originals, surface and fixing MS
clamps of TW block on walls, including cost and conveyance of
all materials and labour charges complete for finished item of
work.

BMW-F.79
BMW-F.80

15 mm dia nominal bore


Rate as per SSR
Labour charges only
For 1 RM
Over heads and Contractors profit @
Rate per 1 RM

BMW-F.81
BMW-F.82

20 mm dia nominal bore


Rate as per SSR
Labour charges only
For 1 RM
Over heads and Contractors profit @
Rate per 1 RM

Unit

Rmt

Amount

466.00
53.60
519.60
65.24
584.84
584.84

Rmt

130.00

130.00
Err:520
Err:520
Err:520

Rmt

680.00
1.00
681.00
95.20
776.20
776.20

Rmt

614.00
43.20
657.20
92.01
749.21
749.21

Rmt

126.00
2.00
128.00
17.92
145.92
145.92

Rmt
Rmt

217.00
9.80
226.80
30.38
257.18
257.18

Each

6530.00
914.20
7444.20
7444.20

Each

10218.00
1430.52
11648.52
11648.52

Each

6237.00
873.18
7110.18
7110.18

Each

9651.00
1351.14
11002.14
11002.14

Each

6091.00
852.74
6943.74
6943.74

Each

513.00
71.82
584.82
584.82

Each

2701.00
378.14
3079.14
3079.14

Each

931.00
82.00
1013.00
141.82
1154.82
1154.82

Each

55.00
130.40

Each
Each

953.00
281.00
1419.40
198.72
1618.12
1618.12

Each

29.00

say

RM

say

RM

say

108.40
137.40
19.24
156.64
156.64

41.00
70.00
111.00
15.54
126.54
126.54

350.00
8.20
358.20
50.15
408.35
408.35

Page 379 of 3205

DATA FOR STORM WATER DRAINS


VIJAYAWADA MUNICIPAL CORPORATION
DATA BASED ON 2014 - 15 SSR
1

BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an initial lea
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of wor
dewatering charges etc as per SS - 20 B (APSS 308).

Ordinary Soil-Manual Means

out put

a)Labour
Mate
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Add Labour component @
Sub total
extra for foundations @
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
2

10.00

0 Nos.
3.64 Nos.
Err:520
75%
Err:520

BLD-CSTN-2-2(10) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lea
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of wor
dewatering charges etc as per SS - 20 B (APSS 308).
out put

Ordinary soils-Mechcanical Means-Upto 3 m depth

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

240

0 Nos.
8.32 Nos.
6 hours
Sub total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering
3

BLD-CSTN-2-4 (12) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lea
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of wor
dewatering charges etc as per SS - 20 B (APSS 308).

Ordinary rock (not requiring blasting)-Manual MeansUpto 3 m depth


a)Labour
Mate
Mazdoor (Unskilled) (excluding LC )
Add Labour component @
Sub total
extra for foundations @
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
4

14%

out put

10.00

0 Nos.
5.20 Nos.
Err:520
75%
14%

BLD-CSTN-2-5 - (13): Earth work excavation for foundations and depositing on bank for all lifts and with an
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished it
excluding dewatering charges etc as per SS - 20 B (APSS 308).

337269598.xlsx drains-data-new

Page 380 of 3205


Ordinary rock (not requiring blasting)-Mechanical Means-Upto
3 m depth
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering

337269598.xlsx drains-data-new

out put
0 Nos.
6.24 Nos.
6 hours
14%

180

Page 381 of 3205


5

BLD-CSTN-2-6 - (14): Earth work excavation for foundations and depositing on bank for all lifts and with an
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished it
excluding dewatering charges etc as per SS - 20 B (APSS 308).
Hard rock (requiring blasting)-Upto 3 m depth
a)Labour
Mate
Driller
Blaster
Mazdoor (Unskilled)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers

out put
0 Nos.
0.50 Nos.
0.25 Nos.
8.35 Nos.
1 hours

c) Materials
Gelatine 80 per cent - M-104, Pg No.246
Electric Detonators @ 1 detonator for 2 gelatine sticks of 285 gm
each - M-094, Pg No.246
Sub total
d) Overheads & Contractors Profit
Total
Cost for 10 cum = a+b+c+d
Rate per 1 Cum excluding Dewatering
6

3.50 Kg
14 Nos.

14%

BLD-CSTN-2-7 - (15): Earth work excavation for foundations and depositing on bank for all lifts and with an
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished it
excluding dewatering charges etc as per SS - 20 B (APSS 308).
Hard rock (blasting prohibited)-Upto 3 m depth
out put
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers of
pneumatic breaker at 1 cum per hour
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d+e)/10
Rate per 1 Cum excluding Dewatering

10

10.00
0.00 Nos
5.20 Nos
6 hour

14%

BLD-CSTN-2-8 (16): Filling with sand in trenches, sides of foundations and basement with initial lead in lay
consolidating each deposited layer by watering and ramming including cost and conveyance of water to work s
labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Sand Filling
a) Material
Sand

6.00
6.00 Cum

b)Labour
Mate
Mazdoor (Unskilled)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
Rate per 1 Cum

337269598.xlsx drains-data-new

14%

Page 382 of 3205


8

BLD-CSTN-2-9 (17): Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations
layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS
out put

Earth filling (ordinary soil)

b)Labour
Mate
Mazdoor (Unskilled)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
Rate per 1 Cum

337269598.xlsx drains-data-new

6.00
0.00 Nos
0.31 Nos
14%

Page 383 of 3205


9

RBR-FNDN-2: Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking
premeasurements
including cost and convenyance of all material and all labour charges etc. complete as pe
305.3.9 MORD & 304 MORTH
a)Labour
Mate
Mazdoor (Unskilled)
b) Material
Stone dust
Sub total a+b
c&d) Overheads & Contractors Profit
Rate per cum = a+b+c+d //6cum

0.00 Nos
0.31 Nos
6.00 Cum
14%

Rate per 6 Cum

Rate per 1 Cum


10

(in accordence with ) RBR-FNDN-4-i : Providing concrete for plain/reinforced concrete in open foundations using
stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 da
technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.-Nominal mix ( 1 : 4
Unit : 1cum
A. MATERIALS:

Cement ( ENC-PH.Memo.No.146 / Cement & Steel / T1 / 2013-14)


Coarse aggregate 40mm graded
Fine aggregate (Sand) ( C-Mat-S.N.2)
Water (including for curing) - S.No.M-189 - Irri - Pg.331

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity - ( Hire chargesIrrigation-S.No.16)


Water tanker 6 kl capacity

0.4 hour
0.13 hour

C. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 Nos
1.39 Nos

Grand Total

Overheads & Contractors Profit

14%
Rate per cu.m.

11

(in accordance with ) BLD-CSTN-3-2 (19) - using concrete mixer up to Plinth Level : Vibrated Cement concrete Gr
level using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramm
surface to the required level curing etc., complete for finished item of work for CC bed and walls of Drains.
Unit : 1cum
A. MATERIALS:
Cement ( ENC-PH.Memo.No.146 / Cement & Steel / T1 / 2013-14)

220.00 Kg

Coarse aggregate 20mm graded ( C-Mat-S.N.48)


Fine aggregate (Sand) ( C-Mat-S.N.2)
Water (including for curing) - S.No.M-189 - Irri - Pg.331

0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity - ( Hire chargesIrrigation-S.No.16)

1.00 Hr

Vibrator hire charges ( Hire - Irrigation-S.No.41)


C. LABOUR:
Mason 1st class (Labour-Irrigation-Skilled S.No.11)

337269598.xlsx drains-data-new

1.00 Hr
0.10 Nos

Page 384 of 3205


Mazdoor (Unskilled) (including-M.A )
S.No.1)
Total
a

(Labour-Irrigation-Unskilled

1.39 Nos

CC M-20 coping and bed


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

1.00 Cum
1.00 Cum
1.00 Cum
Err:520
14%

337269598.xlsx drains-data-new

Page 385 of 3205


b

CC M-20 Drain walls up to 600mm height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92 ( footings )
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

14%

CC M-20 walls above 600mm & up to 1.00m height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92 ( Pedastals )
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

12

1.00
Cum
1.00 Cum
1.00 Cum
Err:520

1.00
Cum
1.00 Cum
1.00 Cum
Err:520
14%

CC M-20 walls above 1.00m & up to 3.00m height


with steel centering
R.C.C. M 20 Per Cum
Centering charges ,Pg No.106 to 111

300 mm
1.00 Cum
3.33 Sqm

Overheads & Contractors Profit


Rate per One Cum

14%

CC M-20 walls above 1.00m & up to 3.00m height


with steel centering
R.C.C. M 20 Per Cum
Centering charges ,Pg No.106 to 111

500 mm
1.00 Cum
2.00 Sqm

Overheads & Contractors Profit


Rate per One Cum

14%

RBR-FNDN-4-C-ii : Providing concrete for plain/reinforced concrete in open foundations using 20 mm Graded Me
placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technic
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
Note : 1) The quantities for cement,course aggregate a
purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found
defference in cost shall be deducted -R.C.C grade M 20 (Design Mix) using 20 mm Graded Metal (MORTH)

M-20 Grade of Design Mix


(a) Material
Cost of Cement

0.347 MT
0.45 cum
0.54 cum
0.36 cum

Coarse sand
20 mm aggregate
10 mm aggregate
(b) Labour

1st Class Mason


Mazdoor (Both Men & Women)

0.100 day
0.139 day

(c) Machinery

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity - ( Hire chargesIrrigation-S.No.16)

0.400 hour

Generator 33 KVA

0.400 hour

BASIC COST per 1 cum

337269598.xlsx drains-data-new

Page 386 of 3205


a

RCC M-20 coping and bed


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

1.00 Cum
1.00 Cum
1.00 Cum
Err:520
14%

337269598.xlsx drains-data-new

Page 387 of 3205


b

RCC M-20 Drain walls up to 600mm height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92 ( footings )
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

14%

RCC M-20 walls above 600mm & up to 1.00m height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92 ( Pedastals )
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

1.00
Cum
1.00 Cum
1.00 Cum
Err:520

1.00
Cum
1.00 Cum
1.00 Cum
Err:520
14%

RCC M-20 walls above 1.00m & up to 3.00m height


with steel centering
R.C.C. M 20 Per Cum
Centering charges ,Pg No.106 to 111

250 mm
1.00 Cum
4.00 Sqm

Overheads & Contractors Profit


Rate per One Cum

14%

RCC M-20 walls above 1.00m & up to 3.00m height


with steel centering
R.C.C. M 20 Per Cum
Centering charges ,Pg No.106 to 111

300 mm
1.00 Cum
3.33 Sqm

Overheads & Contractors Profit


Rate per One Cum

14%

RCC M 20 Slabs 150mm thick


Cost of M- 20 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
6.67 Sqmt.
6.67 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum
g

RCC M 20 Slabs 175mm thick


Cost of M- 20 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
5.71 Sqmt.
5.71 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum
h

RCC M 20 Slabs 200mm thick


Cost of M- 30 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92

1.00 Cum
5.00 Sqmt.
5.00 Sqm
337269598.xlsx drains-data-new

Page 388 of 3205


Add Labour component @

Err:520

Overheads & Contractors Profit


Rate per One Cum

337269598.xlsx drains-data-new

Page 389 of 3205


i

RCC M 20 Slabs 250mm thick


Cost of M- 30 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
4.00 Sqmt.
4.00 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum
j

RCC M 20 Slabs 300mm thick


Cost of M- 30 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
3.33 Sqmt.
3.33 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum
13

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and con
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc
ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Rate per 10 Sqm

14

0.60 Nos
0.96 Nos

BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening,
and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with
grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bar
overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incid
such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete fo
( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage - Fe-415
Grade.
Binding wire- SSR (Irrigation) item No 3, Pg 233
(b) Labour for cutting, bending, shifting to site, tying and
placing in position
Blacksmith / Bar bender
Mazdoor (Unskilled)
Sundries on Material
(c) Overheads on (a+b)
(d) Contractors profit on (a+b+c)
Rate per One MT
Rate per One Kg
15

0.15 Cum
0.15 Cum

1.05

Ton

6.00 kg

10.00
10.00

No
No

Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cos
charges, all leads & lifts and other incidental and operational charges etc., complete.
337269598.xlsx drains-data-new

Page 390 of 3205


a

Rock
Page No.328 of SSR, Conveyance rates - 10.00 Km
Add Sundries
Rate per 1 Cum
Earth
Page No.124 of SSR, Conveyance rates - 10.00 Km
Add Sundries
Rate per 1 Cum

337269598.xlsx drains-data-new

1 cu.m.

1 cu.m.

Page 391 of 3205


16

RBR-PTWK-5: Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical s
/ 2504 MORTH
Stone/Boulder
Unit = cum
(a) Material
Stone boulder (25 kg minimum) /(MORTH - 40 kg)
Stone spalls of minimum 25 mm size
(b) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
c&d) Overheads & Contractors Profit
Rate per 1 Cum

17

1.00
0.20

Cum
Cum

0.35
0.79

day
day
day

14%

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundation
layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS
out put

Earth filling (ordinary soil)

b)Labour
Mate
Mazdoor (Unskilled)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

6.00
0.00 Nos
0.31 Nos
14%

Rate per 1 Cum

18

Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges
etc, complete,
1 Hp-hr Basic rate (as per item No.26/(a)/Pg .. of the SSR (PH
items)
Total
Overheads & Contractors Profit

1 Hp.hr

14.00%
Rate per 1HPhr

19

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix m-20 (C
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all m
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement.
Unit : 1cum
A. MATERIALS:
Cement
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 Hr
0.10 Nos
1.39 Nos

CC M-20 coping and bed


R.C.C. M 20 Per Cum

1.00
337269598.xlsx drains-data-new

Cum

Page 392 of 3205


Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
Err:520

Overheads & Contractors Profit

14%
Total

VAT and labour cess etc,.


Rate per One Cum
20

Err:520

RBR-FNDN-4-C-ii : Providing concrete for plain/reinforced concrete in open foundations using 20 mm Graded Me
placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technic
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
Note : 1) The quantities for cement,course aggregate a
purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found
defference in cost shall be deducted -R.C.C grade M 30 (Design Mix) using 20 mm Graded Metal (MORTH)

M-30 Grade of Design Mix


(a) Material
Cost of Cement

0.407 MT
0.45 cum
0.54 cum
0.36 cum

Coarse sand
20 mm aggregate
10 mm aggregate
(b) Labour

1st Class Mason


Mazdoor (Both Men & Women)

0.100 day
0.139 day

(c) Machinery

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity - ( Hire chargesIrrigation-S.No.16)

0.400 hour

Generator 33 KVA

0.400 hour

BASIC COST per 1 cum


a

RCC M-20 coping and bed


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

14%

RCC M-20 Drain walls up to 600mm height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92 ( footings )
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

1.00 Cum
1.00 Cum
1.00 Cum
Err:520

1.00
Cum
1.00 Cum
1.00 Cum
Err:520
14%

RCC M-20 walls above 600mm & up to 1.00m height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92 ( Pedastals )
Labour charges,Pg No.92
Add Labour component on Labour charges @
Overheads & Contractors Profit
Rate per One Cum

1.00
Cum
1.00 Cum
1.00 Cum
Err:520
14%

337269598.xlsx drains-data-new

Page 393 of 3205


d

RCC M-20 walls above 1.00m & up to 3.00m height


with steel centering
R.C.C. M 20 Per Cum
Centering charges ,Pg No.106 to 111

250 mm
1.00 Cum
4.00 Sqm

Overheads & Contractors Profit


Rate per One Cum

14%

RCC M-20 walls above 1.00m & up to 3.00m height


with steel centering
R.C.C. M 20 Per Cum
Centering charges ,Pg No.106 to 111

300 mm
1.00 Cum
3.33 Sqm

Overheads & Contractors Profit


Rate per One Cum

14%

337269598.xlsx drains-data-new

Page 394 of 3205


f

RCC M-20 walls above 1.00m & up to 3.00m height


with steel centering
R.C.C. M 20 Per Cum
Centering charges ,Pg No.106 to 111

350 mm
1.00 Cum
2.86 Sqm

Overheads & Contractors Profit


Rate per One Cum

14%

RCC M 20 Slabs 150mm thick


Cost of M- 20 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
6.67 Sqmt.
6.67 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum
g

RCC M 20 Slabs 175mm thick


Cost of M- 20 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
5.71 Sqmt.
5.71 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum
h

RCC M 20 Slabs 200mm thick


Cost of M- 30 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
5.00 Sqmt.
5.00 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum
i

RCC M 20 Slabs 250mm thick


Cost of M- 30 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
4.00 Sqmt.
4.00 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum
j

RCC M 20 Slabs 350mm thick


Cost of M- 30 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
2.86 Sqmt.
2.86 Sqm
Err:520

Overheads & Contractors Profit


Rate per One Cum

337269598.xlsx drains-data-new

Page 395 of 3205

DRAINS

RATION

SR

or all lifts and with an initial lead of 10m including all operational,
mplete for finished item of work including seigniorage excluding

Cum
375.00
320.00

1 Each
1 Each

Rs

0.00
1164.80
465.92
1630.72
873.60
2504.32
350.6
2854.92
285.49
285.49

for all lifts and with an initial lead of 10m including all operational,
mplete for finished item of work including seigniorage excluding
Cum
375.00
320.00

1 Each
1 Each

0.00
2662.40

2791.00

1 hours

16746.00
19408.40
2717.18
22125.58
92.19
92.19

Rs

for all lifts and with an initial lead of 10m including all operational,
mplete for finished item of work including seigniorage excluding

Cum
375.00
320.00

1 Each
1 Each

Rs

0.00
1664.00
665.60
2329.60
1248.00
3577.60
500.86
4078.46
407.85
407.85

bank for all lifts and with an initial lead of 10m including all
g, etc. complete for finished item of work including seigniorage

337269598.xlsx drains-data-new

Page 396 of 3205


Cum
375.00
320.00

1 Each
1 Each

0.00
1996.80

2791.00

1 hours

16746.00
18742.80
2623.99
21366.79
118.7
118.70

Rs

337269598.xlsx drains-data-new

Page 397 of 3205

bank for all lifts and with an initial lead of 10m including all
g, etc. complete for finished item of work including seigniorage

Cum
375.00
480.00
480.00
320.00

1 Each
1 Each
1 Each
1 Each

0.00
240.00
120.00
2672.00

1145.10

1 hours

1145.10

73.00
13.00

1 Kg
100 Nos.

255.50
1.82

Rs

4434.42
620.82
5055.24
505.52
505.52

bank for all lifts and with an initial lead of 10m including all
g, etc. complete for finished item of work including seigniorage

Cum
375.00
320.00

1 Nos
1 Nos

0.00
1664.00

1145.10

1 hour

6870.60

8534.60
1194.84
9729.44
972.94
972.94

sement with initial lead in layers not exceeding 15 cm thick,


onveyance of water to work site and all operational, incidental,
NO. 309 & 310)
Cum
641.93

1 Cum

3851.58

375.00
320.00

1 Nos
1 Nos

0.00
99.20
3950.78
553.11
4503.89
750.65
750.65

337269598.xlsx drains-data-new

Page 398 of 3205

n trenches, sides of foundations and basement with initial lead in


nd ramming including cost and conveyance of water to work site
or finished item of work. (APSS NO. 309 & 310)
Cum
375.00
320.00

1 Nos
1 Nos

0.00
99.20
13.89
113.09
18.85
18.85

337269598.xlsx drains-data-new

Page 399 of 3205

ry to work site and stacking at work site to Dept. gauge for


r charges etc. complete as per standard specifications. Clause

375.00
320.00

1 Nos
1 Nos

1001.81

1 Cum

0.00
99.20
6010.86
6110.06
855.41
6965.47
6965.47
1160.92

ete in open foundations using 40 mm nominal size Graded hard


ation including curing for 14 days complete as per drawings and
0 MORTH.-Nominal mix ( 1 : 4 : 8 )

Err:520

1 Kg

1036.80

1489.81
641.93
103.00

1 Cum
1 Cum
1 Kl

1340.83
288.87
123.60

338.60

1 hour

135.44

630.00

1 hour

81.90

504.00
320.00

1 Nos
1 Nos

50.40
444.80
3502.64
490.37
3993.01

Rs
Rs

: Vibrated Cement concrete Grade M10 Nominal Mix upto Plinth


onveyance of all materials like cement, sand, coarse aggregate
ixing , laying, concrete , ramming in 15 cm layers, finishing top
d and walls of Drains.

6.40
1854.81
641.93
103.00

1 Kg

1408.00

1 Cum
1 Cum
1 Kl

1669.33
288.87
123.60

338.60

1 Hr

338.60

175.40

1 Hr

175.40

504.00

1 Nos

50.40

337269598.xlsx drains-data-new

Page 400 of 3205


320.00

4499.00
277.00
446.00

1 Nos

444.80
Rs

4499.00

Rs

4499.00
277.00
446.00
178.40
5400.40
756.06
6156.46

1 Cum
1 Cum
1 Cum

337269598.xlsx drains-data-new

Page 401 of 3205


4499.00
277.00
446.00

4499.00
1335.00
710.00

4499.00
876.00

4499.00
876.00

1 Cum
1 Cum
1 Cum

Rs

4499.00
277.00
446.00
178.40
5400.40
756.06
6156.46

Rs

4499.00
1335.00
710.00
284.00
6828.00
955.92
7783.92

Rs

4499.00
2917.08
7416.08
1038.25
8454.33

Rs

4499.00
1752.00
6251.00
875.14
7126.14

1 Cum
1 Cum
1 Cum

1 Cum
1 Sqm

1 Cum
1 Sqm

tions using 20 mm Graded Metal (MORD), mechanically mixed,


ete as per drawings and technical specifications Clause 802, 803,
for cement,course aggregate and fine aggregates for estimating
the cement content is found to be less than 350 Kgs/ Cum the
Graded Metal (MORTH)

6400.00
641.93
2009.81
1579.81

1 MT
1 cum
1 cum
1 cum

2220.80
288.87
1085.30
568.73

504.00
320.00

1 day
1 day

50.40
44.48

338.60

1 hour

135.44

816.80

1 hour
Rs.

326.72
4720.74

337269598.xlsx drains-data-new

Page 402 of 3205


4720.74
277.00
446.00

1 Cum
1 Cum
1 Cum

Rs

4720.74
277.00
446.00
178.40
5622.14
787.1
6409.24

337269598.xlsx drains-data-new

Page 403 of 3205


4720.74
277.00
446.00

4720.74
1335.00
710.00

4720.74
876.00

4720.74
876.00

4720.74
152.00
121.00

1 Cum
1 Cum
1 Cum

Rs

4720.74
277.00
446.00
178.40
5622.14
787.1
6409.24

Rs

4720.74
1335.00
710.00
284.00
7049.74
986.96
8036.70

Rs

4720.74
3504.00
8224.74
1151.46
9376.20

Rs

4720.74
2917.08
7637.82
1069.29
8707.11

1 Cum
1 Cum
1 Cum

1 Cum
1 Sqm

1 Cum
1 Sqm

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

4720.74
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

4720.74
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm

4720.74
1013.33
806.67
322.67
6863.41
960.88
7824.29

4720.74
890.76
708.04
283.22
6602.76
924.39
7527.15

4720.74
780.00
620.00
337269598.xlsx drains-data-new

Page 404 of 3205


Rs
Rs

248.00
6368.74
891.62
7260.36

337269598.xlsx drains-data-new

Page 405 of 3205


4720.74
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

4720.74
164.00
130.00

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

4720.74
624.00
496.00
198.40
6039.14
845.48
6884.62

4720.74
546.12
432.90
173.16
5872.92
822.21
6695.13

smooth including cost and conveyance of all materials to site,


al, incidental, labour charges etc., including cutting grooves where
m.

3733.88
0.00

1 Cum
1 Cum

560.08
0.00

504.00
320.00

1 Nos
1 Nos

302.40
307.20
1169.68
163.76
1333.44

Rs

chanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
bour charges for straightening, cutting, bending to required sizes
and tying and lap-splicing with binding wire of 18 SWG, forming
t and conveyance of steel bars, including all wastages such as
wire, cover blocks and all incidental, operational, labour charges
n all materials etc., complete for finished item of work in all floors.

34000.00

1 Ton

35700.00

70.00

1 kg

420.00

588.00
320.00

1 No
1 No

5880.00
3200.00

Sub Total:
Rs.

6328.00
51528.00
51.53

ading, unloading charges, cost & conveyance, dumping, labour

337269598.xlsx drains-data-new

Page 406 of 3205


144.70

1 Cum
Rs

144.70

1 Cum

144.70
0.00
144.70
144.70

Rs

0.00
144.70

337269598.xlsx drains-data-new

Page 407 of 3205

a as per drawing and technical specifications Clause 1302 MORD

164.00
306.76

1 Cum
1 Cum

504.00
320.00

1 day
1 day
1 day

164
61.35

Rs
Rs

176.4
252.8
654.55
91.64
746.19

n trenches, sides of foundations and basement with initial lead in


nd ramming including cost and conveyance of water to work site
or finished item of work. (APSS NO. 309 & 310)
Cum
0.00
320.00

1 Nos
1 Nos

0.00
99.20
13.89
113.09
18.85
18.85

ding hire charges, fuel charges and wages for Driver and Helper
53.00

1 Hp.hr

53.00
Rs

Rs

53.00
7.42
60.42
60.42

concrete nominal mix m-20 (Cement : fine aggregate: coarse


g cost and conveyance of all materials like cement, sand, coarse
, for mixing , laying, concrete , ramming in 15 cm layers, finishing
omonal reinforcement.

6.40
1854.81
641.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

338.60

1 Hr

504.00
320.00

1 Each
1 Each

2112.00
1669.33
288.87
123.60
338.60

Rs

5027.60

1 Cum

50.40
444.80
5027.60

5027.60
337269598.xlsx drains-data-new

Page 408 of 3205


61.00
230.00

1 Cum
1 Cum

Rs

61.00
230.00
92.00
5410.60
757.48
6168.08
0.00
6168.08

tions using 20 mm Graded Metal (MORD), mechanically mixed,


ete as per drawings and technical specifications Clause 802, 803,
for cement,course aggregate and fine aggregates for estimating
the cement content is found to be less than 350 Kgs/ Cum the
Graded Metal (MORTH)

6400.00
641.93
2009.81
1579.81

1 MT
1 cum
1 cum
1 cum

2604.80
288.87
1085.30
568.73

504.00
320.00
0.00
338.60

1 day
1 day

50.40
44.48

1 hour

135.44

816.80

1 hour

5104.74
277.00
446.00

5104.74
277.00
446.00

5104.74
1335.00
710.00

Rs.

326.72
5104.74

Rs

5104.74
277.00
446.00
178.40
6006.14
840.86
6847.00

Rs

5104.74
277.00
446.00
178.40
6006.14
840.86
6847.00

Rs

5104.74
1335.00
710.00
284.00
7433.74
1040.72
8474.46

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

337269598.xlsx drains-data-new

Page 409 of 3205

5104.74
876.00

5104.74
876.00

1 Cum
1 Sqm

Rs

5104.74
3504.00
8608.74
1205.22
9813.96

Rs

5104.74
2917.08
8021.82
1123.05
9144.87

1 Cum
1 Sqm

337269598.xlsx drains-data-new

Page 410 of 3205

5104.74
876.00

1 Cum
1 Sqm

Rs

5104.74
152.00
121.00

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

5104.74
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

5104.74
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

5104.74
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

5104.74
164.00
130.00

1 Cum
1 Sqmt.
1 Sqm
Rs
Rs

5104.74
2505.36
7610.10
1065.41
8675.51

5104.74
1013.33
806.67
322.67
7247.41
1014.64
8262.05

5104.74
890.76
708.04
283.22
6986.76
978.15
7964.91

5104.74
780.00
620.00
248.00
6752.74
945.38
7698.12

5104.74
624.00
496.00
198.40
6423.14
899.24
7322.38

5104.74
469.04
371.80
148.72
6094.30
853.20
6947.50

337269598.xlsx drains-data-new

Page 411 of 3205

GADWAL MUNICIPALITY

Comprehensive Water supply scheme for Gadwal Municipality including Strengthening of Water Supply Distribution N

Detailed and Abstract Estimate for Internal Electrification to the Watch Man Quarter
S.No

Description

BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof
Slabs with all required accessories including masonary work and labour charges etc., complete.

for Circuite wiring for Switch board to all rooms in GF


In Roof Slab along the length
Hall
Bedroom
kitchen
Toilet
Wash
Add extra
Total
BLD-ELEC-1-4.1 (b) :Supply and Fixing of 20mm dia1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall
with all required accessories including masonary work for light, fan and separate plug point with well
seasoned wooden deep box including all labour charges etc., complete.
Hall
Bedroom
kitchen
Toilet
Wash
Add extra for wastage at 15%

Elec- Est -Elec- Est

Qty

1
1
1
1
1
1

x
x
x
x
x
x

2
1
1
1
1
1

8.56
10.36
7.62
5.50
4.21
3.85

17.20
10.40
7.70
5.50
4.30
3.90
4.90
53.90

1
1
1
1
1

x
x
x
x
x

1
1
1
1
1

22.22
16.90
12.70
10.12
9.40

22.30
16.90
12.70
10.20
9.40
7.20
78.70

1
1
1

x
x
x

3
7
4

TOTAL
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R flexible copper cable (ISI MARK) in
existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box
including all labour charges etc., complete for light, bell, fan and exhaust fan points in Residential Buildings.

Ceiling Fan points


CFL Light point
Wall mounted lights/ tube lights

Measurments
B

3
7
4
14

Page 412 of 3205

S.No

Description

BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common
switch board with earth continuity including wire leads, earth connections along with all labour charges etc.,
complete.

Hall
Bedroom
Kitchen
5

1
1
1

2
1
1

BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable
in existing pipe for earth continuity including all labour charges etc., complete.
6A 3 pin wall plug socket with 6A switch
16A 3pin / 6A 3pin plug socket
add extra

x
x
x

Measurments
B

Qty

2
1
1
4
Avg

1
1

x
x

4
1

4.00
3.00

16.00
3.00
2.00
21.00

BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable
in existing pipe for mains inlcuding all labour charges etc., complete.
for Total House
6.1.3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire
through PVC cleats with all accessories including labour charges etc., complete for service mains.

5.05

5.05

From Pole to Block


Supply and erection of Panel mounting cubical type 30 / 32A TPN 415V, 50 Hz. switch disconnector fuse
unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with
fuse links on existing control panel.

10.00

10.00

30 / 32A TPN 415V, 50 Hz. switchs Disconnector fuse unit with HRC fuses.

BLD-ELEC-5-1 : Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as
per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary
accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt
and Charcoal in layers and all labour charges etc., complete for small quarters.
for Total house

Elec- Est -Elec- Est

Page 413 of 3205

S.No

Description

Measurments
B

Qty

10 BLD-ELEC-8-2-2 : Supply and Transportation and fixing on wall / ceiling of 1x36/40W box type tube light
luminaire with copper / VPIT Choke, condensor, starters etc., and 1No 36/40W tube etc., complete.with all
standard accessories of makes Wipro / G.E./ Phillips.
Tube lights in all Rooms
11 BLD-ELEC-9.7.2 : Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades
and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic
Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC
slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts &
nuts duly painted with matching colour of fan etc,. complete

in all rooms
12

BLD-ELEC-9.7.16 : Supply of fresh air exhaust fan of light duty 250V A.C.50Hz.. 225 mm (9") / 300mm size
(12") 1350 R.P.M Metallic body plastic blades, wire mesh, etc., complete.

In toilets & Kitchen


13 BLD-ELEC-14.2.9 : Supply and fixing of single phase energy Meter,240V AC,50 HZ as per IS13010 with
2.5-5 /5-10/10-20 Amps range with 200% over load capacity complete with connections etc., complete on
the existing board.
C. Total of internal electrification
Total

Elec- Est -Elec- Est

Page 414 of 3205

WAL MUNICIPALITY

pality including Strengthening of Water Supply Distribution Net work

nternal Electrification to the Watch Man Quarter


Qty

Rate Rs.

Per

Amount Rs.

Data Elc.Stnd.
S.no 1.4.2-c

Rmt

70.81

1 Rmt

3817.00

1 Rmt

19637.00

1 Nos

6101.00

Data Elc.Stnd.
S.no 1.4.1-b

Rmt

249.52
Data Elc.Stnd.
S.no 2.1.2

Nos

435.78

Elec- Est -Elec- Est

Page 415 of 3205

Qty

Rate Rs.

Per

Amount Rs.

Data Elc.Stnd.
S.no 2.1.4

Nos

129.66

1 Nos

519.00

1 Rmt

209.00

1 Rmt

380.00

1 Rmt

3481.00

1 Nos

8393.00

1 Nos

15456.00

Data Elc.Stnd.
S.no 3.1.2

Rmt

9.93
Data Elc.Stnd.
S.no 3.1.4

Rmt

75.32
Elc.Stnd. data
6.1.3

Rmt

348.11
Elc.Stnd. data
4.1.1

Nos

8392.93
Elc.Stnd. data
5.1.1

Nos

15455.71

Elec- Est -Elec- Est

Page 416 of 3205

Qty

Rate Rs.

Per

Amount Rs.

BLD-ELEC-8-22

Nos

2379.75

1 Nos

9519.00

1 Nos

1891.00

1 Nos

10194.00

BLD-ELEC-9.7.2

Nos

630.25
BLD-ELEC9.7.16

Nos

5096.88
BLD-ELEC14.2.9

Nos

678.53

1 Nos
Rs

Elec- Est -Elec- Est

679.00
80276.00
80276.00

Page 417 of 3205


CENTRING CHARGES - 2014-15 ( Pg.N. 84 to 89 of Bld. Items ) (AP.Bld.SSR-14-15)
Sl

NAME OF THE STRUCTURAL MEMBER

Material Hire charges

Labour charges

Centring Charges for 201415

Unit of
Measurem't

HIRE CHARGES FOR CENTERING & SCAFFOLDING


A

FOOTINGS

Rs.

277.00

446.00

Rs.

723.00

per 1 cum

BED BLOCKS, BANDS

Rs.

61.00

230.00

Rs.

291.00

per 1 cum

PEDESTALS

Rs.

315.00

710.00

Rs.

1025.00

per 1 cum

PLINTH BEAMS

Rs.

1335.00

1075.00

Rs.

2410.00

per 1 cum

HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height upto 3.66 M
Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc.,
E

LINTELS

Rs.

1133.00

1141.00

Rs.

2274.00

per 1 cum

CHAJJAS - SUNSHADES

Rs.

224.00

175.00

Rs.

399.00

per 1 sqm

COLUMNS

Rs.

341.00

1603.00

Rs.

1944.00

per 1 cum

BEAMS

Rs.

2002.00

1344.00

Rs.

3346.00

per 1 cum

SLABS - Up to 150 mm thick

Rs.

227.00

152.00

Rs.

379.00

per 1 sqm

SLABS - above 150 mm - Up to 300 mm thick

Rs.

233.00

157.00

Rs.

390.00

per 1 sqm

SLABS - above 300 mm thick

Rs.

244.00

164.00

Rs.

408.00

per 1 sqm

Rs.

824.00

553.00

Rs.

1377.00

per 1 sqm

WAFFLE - (GRID) SLABS (Rib Beams with


Slabs)
PERGOLA SLABS (Only Rib Beams)

Rs.

578.00

388.00

Rs.

966.00

per 1 sqm

ARCH BEAMS - up to 1.5 M Span

Rs.

2276.00

1528.00

Rs.

3804.00

per 1 cum

ARCH BEAMS - above 1.5 M Span

Rs.

2308.00

1550.00

Rs.

3858.00

per 1 cum

DOME SLABS

Rs.

3681.00

2471.00

Rs.

6152.00

per 1 cum

HELICAL STAIRCASES

Rs.

280.00

188.00

Rs.

468.00

per 1 sqm

SHEAR WALLS, RCC WALLS, WATER TANK


WALLS

Rs.
Cent'g--14-15

Page 418 of 3205

HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height upto 7.32 M
Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc.,
D

LINTELS

Rs.

2042.00

1806.00

Rs.

3848.00 per 1 cum

CHAJJAS - SUNSHADES

Rs.

403.00

278.00

Rs.

681.00 per 1 sqm

F
G

COLUMNS
BEAMS

Rs.
Rs.

615.00
3607.00

2537.00
2127.00

Rs.
Rs.

3152.00 per 1 cum


5734.00 per 1 cum

SLABS - Up to 150 mm thick

Rs.

409.00

241.00

Rs.

650.00 per 1 sqm

SLABS - above 150 mm - Up to 300 mm thick

Rs.

421.00

248.00

Rs.

669.00 per 1 sqm

SLABS - above 300 mm thick

Rs.

440.00

259.00

Rs.

699.00 per 1 sqm

WAFFLE - (GRID) SLABS (Rib Beams with


Slabs)

Rs.

1485.00

876.00

Rs.

2361.00 per 1 sqm

PERGOLA SLABS (Only Rib Beams)

Rs.

1042.00

614.00

Rs.

1656.00 per 1 sqm

ARCH BEAMS - up to 1.5 M Span

Rs.

4101.00

2418.00

Rs.

6519.00 per 1 cum

ARCH BEAMS - above 1.5 M Span

Rs.

4159.00

2452.00

Rs.

6611.00 per 1 cum

DOME SLABS

Rs.

6632.00

3911.00

Rs.

10543.00 per 1 cum

HELICAL STAIRCASES

Rs.

505.00

298.00

Rs.

803.00 per 1 sqm

SHEAR WALLS, RCC WALLS, WATER TANK


WALLS

Rs.

Cent'g--14-15

Page 419 of 3205

HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height up to 3.66 M


Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc.,
D

LINTELS

Rs.

760.00

903.00

Rs.

1663.00

per 1 cum

CHAJJAS - SUNSHADES

Rs.

150.00

139.00

Rs.

289.00

per 1 sqm

COLUMNS

Rs.

229.00

1268.00

Rs.

1497.00

per 1 cum

BEAMS

Rs.

1342.00

1064.00

Rs.

2406.00

per 1 cum

SLABS - Up to 150 mm thick

Rs.

152.00

121.00

Rs.

273.00

per 1 sqm

SLABS - above 150 mm - Up to 300 mm thick

Rs.

156.00

124.00

Rs.

280.00

per 1 sqm

SLABS - above 300 mm thick

Rs.

164.00

130.00

Rs.

294.00

per 1 sqm

WAFFLE - (GRID) SLABS (Rib Beams with


Slabs)

Rs.

553.00

438.00

Rs.

991.00

per 1 sqm

PERGOLA SLABS (Only Rib Beams)

Rs.

387.00

307.00

Rs.

694.00

per 1 sqm

ARCH BEAMS - up to 1.5 M Span

Rs.

1526.00

1209.00

Rs.

2735.00

per 1 cum

ARCH BEAMS - above 1.5 M Span

Rs.

1547.00

1226.00

Rs.

2773.00

per 1 cum

DOME SLABS

Rs.

2467.00

1955.00

Rs.

4422.00

per 1 cum

HELICAL STAIRCASES

Rs.

188.00

149.00

Rs.

337.00

per 1 sqm

SHEAR WALLS, RCC WALLS, WATER TANK


WALLS

Rs.

Note : For Shear Walls, RCC Walls, Water Tank walls the centring charges are for both faces (back and front)
HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates
etc., for BRICK MASONRY/ STONE MASONRY/ WALL PUTTY/ TEXTURE PAINTS etc - 1 sqm
A

1st - Floor

Rs.

9.93

58.66

Rs.

68.59

per 1 sqm

2nd - Floor

Rs.

9.93

83.03

Rs.

92.96

per 1 sqm

3rd - Floor

Rs.

9.93

107.39

Rs.

117.32

per 1 sqm

4th - Floor

Rs.

9.93

131.76

Rs.

141.69

per 1 sqm

Cent'g--14-15

Page 420 of 3205


E

5th - Floor

Rs.

9.93

156.12

Rs.

166.05

per 1 sqm

6th - Floor

Rs.

9.93

180.49

Rs.

190.42

per 1 sqm

7th - Floor

Rs.

9.93

204.85

Rs.

214.78

per 1 sqm

8th - Floor

Rs.

9.93

229.22

Rs.

239.15

per 1 sqm

9th - Floor

Rs.

9.93

253.59

Rs.

263.52

per 1 sqm

10th - Floor

Rs.

9.93

277.95

Rs.

287.88

per 1 sqm

11th - Floor

Rs.

9.93

302.32

Rs.

312.25

per 1 sqm

12th - Floor

Rs.

9.93

326.68

Rs.

336.61

per 1 sqm

13th - Floor

Rs.

9.93

351.05

Rs.

360.98

per 1 sqm

14th - Floor

Rs.

9.93

375.41

Rs.

385.34

per 1 sqm

15th - Floor

Rs.

9.93

399.78

Rs.

409.71

per 1 sqm

Cent'g--14-15

Page 421 of 3205

HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates
etc., for PLASTERING to WALLS - 1 sqm
A

1st - Floor

Rs.

0.99

5.87

Rs.

6.86

per 1 sqm

2nd - Floor

Rs.

0.99

8.30

Rs.

9.29

per 1 sqm

3rd - Floor

Rs.

0.99

10.74

Rs.

11.73

per 1 sqm

4th - Floor

Rs.

0.99

13.18

Rs.

14.17

per 1 sqm

5th - Floor

Rs.

0.99

15.61

Rs.

16.60

per 1 sqm

6th - Floor

Rs.

0.99

18.05

Rs.

19.04

per 1 sqm

7th - Floor

Rs.

0.99

20.49

Rs.

21.48

per 1 sqm

8th - Floor

Rs.

0.99

22.92

Rs.

23.91

per 1 sqm

9th - Floor

Rs.

0.99

25.36

Rs.

26.35

per 1 sqm

10th - Floor

Rs.

0.99

27.80

Rs.

28.79

per 1 sqm

11th - Floor

Rs.

0.99

30.23

Rs.

31.22

per 1 sqm

12th - Floor

Rs.

0.99

32.67

Rs.

33.66

per 1 sqm

13th - Floor

Rs.

0.99

35.10

Rs.

36.09

per 1 sqm

14th - Floor

Rs.

0.99

37.54

Rs.

38.53

per 1 sqm

15th - Floor

Rs.

0.99

39.98

Rs.

40.97

per 1 sqm

HIRE CHARGES FOR STAGE SCAFFOLDING - up to 3.66 M using Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates
etc., for CEILING PLASTERING - 1 sqm
A

1st - Floor

Rs.

2.37

11.95

Rs.

14.32

per 1 sqm

2nd - Floor

Rs.

2.37

16.75

Rs.

19.12

per 1 sqm

3rd - Floor

Rs.

2.37

21.54

Rs.

23.91

per 1 sqm

4th - Floor

Rs.

2.37

26.33

Rs.

28.70

per 1 sqm

5th - Floor

Rs.

2.37

31.13

Rs.

33.50

per 1 sqm

6th - Floor

Rs.

2.37

35.92

Rs.

38.29

per 1 sqm

7th - Floor

Rs.

2.37

40.71

Rs.

43.08

per 1 sqm

8th - Floor

Rs.

2.37

45.50

Rs.

47.87

per 1 sqm

Cent'g--14-15

Page 422 of 3205


I

9th - Floor

Rs.

2.37

50.30

Rs.

52.67

per 1 sqm

10th - Floor

Rs.

2.37

55.09

Rs.

57.46

per 1 sqm

11th - Floor

Rs.

2.37

59.88

Rs.

62.25

per 1 sqm

12th - Floor

Rs.

2.37

64.68

Rs.

67.05

per 1 sqm

13th - Floor

Rs.

2.37

69.47

Rs.

71.84

per 1 sqm

14th - Floor

Rs.

2.37

74.26

Rs.

76.63

per 1 sqm

15th - Floor

Rs.

2.37

79.05

Rs.

81.42

per 1 sqm

Cent'g--14-15

Page 423 of 3205


FOR SUMPS AND SEPTIC TANKS (PH SSR ) Pg-7 of PH SoR-2014-15

4) RCC vertical walls of plane surface up to 3 m height such as ground level


tanks clarifiers and sludge digesters etc.

31.b.4

876.00

per 1 sqm

5) RCC vertical walls of circular faces up to 3 m height.

31.b.5

1115.00

per 1 sqm

Lift or delift of materials :


a) Lifting of cement concrete for RCC elevated reservoir. For every 1m
height or part thereof over the initial lift of 3 m
b) Delifting the materials such as stones, concrete etc., for concrete below
ground level for construction of masonry ground level reservoirs,
construction of masonry ground level reservoirs, inspection wells, test wells
and sump wells etc., for every 1 m depth or part thereof beyond the initial
depth of 3 meters from ground level.

32.a

134.00

per 1 cum

32.b

41.00

per 1 cum

for R C C Elevated Service Reservoir of staging up to 15 metre below L W L.


1) Slabs for thickness (150 mm to 300 mm)

3260.00

per 1 sqm

2) Slabs for thickness above (300 mm)

6518.00

per 1 sqm

3) Side walls curved surfaces.

2463.00

per 1 sqm

4) Side wall straight surfaces.

2192.00

per 1 sqm

5) Dome.

2670.00

per 1 sqm

6) Roof Slab.

1643.00

per 1 sqm

8) Column braces and beams

1099.00

per 1 sqm

9) Circular braces, ring beams & circular column.

1206.00

per 1 sqm

Note:- For RCC ELSR of staging above 15 m, the % increase in these rates shall be as follows.
15-18 m ---

9%

18 - 21m ---

15%

21- 24 m ---

21%

24 -27m ---

27%

above 27m ---

30%

Cent'g--14-15

Page 424 of 3205

CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Steel scaffolding pipes, jack Pr
for unsupported height 3.66 M for the year 2013-14 (Pg.106 to 108 of Bld.

Floor

Hire Charges
Labour Charges
Total Hire Charges (H+L)

LINTELS

H
L
T

1133.00
1144.00
2277.00

CHAJJA SUNSHADES

224.00
175.00
399.00

COLUMNS

341.00
1603.00
1944.00

BEAMS

2002.00
1344.00
3346.00

SLABS - above
SLABS - Up to
150 mm - Up to
150 mm thick
300 mm thick

227.00
152.00
379.00

233.00
157.00
390.00

1st - Floor
L
1141.00
175.00
1603.00
1344.00
152.00
157.00
2nd - Floor
L
1255.00
193.00
1763.00 1478.00
167.00
173.00
3rd - Floor
L
1369.00
210.00
1924.00 1613.00
182.00
188.00
4th - Floor
L
1483.00
228.00
2084.00 1747.00
198.00
204.00
5th - Floor
L
1597.00
245.00
2244.00 1882.00
213.00
220.00
6th - Floor
L
1712.00
263.00
2405.00 2016.00
228.00
236.00
7th - Floor
L
1826.00
280.00
2565.00 2150.00
243.00
251.00
8th - Floor
L
1940.00
298.00
2725.00 2285.00
258.00
267.00
9th - Floor
L
2054.00
315.00
2885.00 2419.00
274.00
283.00
10th - Floor
L
2168.00
333.00
3046.00 2554.00
289.00
298.00
11th - Floor
L
2282.00
350.00
3206.00 2688.00
304.00
314.00
12th - Floor
L
2396.00
368.00
3366.00 2822.00
319.00
330.00
13th - Floor
L
2510.00
385.00
3527.00 2957.00
334.00
345.00
14th - Floor
L
2624.00
403.00
3687.00 3091.00
350.00
361.00
15th - Floor
L
2739.00
420.00
3847.00 3226.00
365.00
377.00
Note: - Centering & scaffolding charges for steel scaffolding with pipes, jack props, steel centring plates for unsupported heights of every 610 mm height above 3.66 M may be allow
applicable floor and item
4.27 M
16.67%
4.88 M 33.33%
5.49 M

CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Steel scaffolding pipes, jack Pr
for unsupported height 7.32 M for the year 2013-14
Cent'g--14-15

Page 425 of 3205

Hire Charges
Labour Charges
Total Hire Charges (H+L)

H
L
T

CHAJJA SUNSHADES
2042.00
403.00
1806.00
278.00
3848.00
681.00

1st - Floor
2nd - Floor
3rd - Floor
4th - Floor
5th - Floor
6th - Floor
7th - Floor
8th - Floor
9th - Floor
10th - Floor
11th - Floor
12th - Floor
13th - Floor
14th - Floor
15th - Floor

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

1806.00
1987.00
2167.00
2348.00
2528.00
2709.00
2890.00
3070.00
3251.00
3431.00
3612.00
3793.00
3973.00
4154.00
4334.00

Floor

LINTELS

278.00
306.00
334.00
361.00
389.00
417.00
445.00
473.00
500.00
528.00
556.00
584.00
612.00
639.00
667.00

615.00
2537.00
3152.00

SLABS - above
SLABS - Up to
150 mm - Up to
150 mm thick
300 mm thick
3607.00
409.00
421.00
2127.00
241.00
248.00
5734.00
650.00
669.00

2537.00
2791.00
3044.00
3298.00
3552.00
3806.00
4059.00
4313.00
4567.00
4820.00
5074.00
5328.00
5581.00
5835.00
6089.00

2127.00
2340.00
2552.00
2765.00
2978.00
3191.00
3403.00
3616.00
3829.00
4041.00
4254.00
4467.00
4679.00
4892.00
5105.00

COLUMNS

BEAMS

241.00
265.00
289.00
313.00
337.00
362.00
386.00
410.00
434.00
458.00
482.00
506.00
530.00
554.00
578.00

248.00
273.00
298.00
322.00
347.00
372.00
397.00
422.00
446.00
471.00
496.00
521.00
546.00
570.00
595.00

CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Casurina Ballies, Bamboos, Wooden Rea
Steel Centring Plates etc., for unsupported height 3.66 M for the year 20

Floor

LINTELS

CHAJJASUNSHADES

COLUMNS

BEAMS

SLABS - above
SLABS - Up to
150 mm - Up to
150 mm thick
300 mm thick

Hire Charges
Labour Charges
Total Hire Charges (H+L)

H
L
T

760.00
903.00
1663.00

150.00
139.00
289.00

229.00
1268.00
1497.00

1342.00
1064.00
2406.00

152.00
121.00
273.00

156.00
124.00
280.00

1st - Floor

903.00

139.00

1268.00

1064.00

121.00

124.00

Cent'g--14-15

Page 426 of 3205


2nd - Floor
3rd - Floor
4th - Floor
5th - Floor
6th - Floor
7th - Floor
8th - Floor
9th - Floor
10th - Floor
11th - Floor
12th - Floor
13th - Floor
14th - Floor
15th - Floor

L
L
L
L
L
L
L
L
L
L
L
L
L
L

993.00
1084.00
1174.00
1264.00
1355.00
1445.00
1535.00
1625.00
1716.00
1806.00
1896.00
1987.00
2077.00
2167.00

153.00
167.00
181.00
195.00
209.00
222.00
236.00
250.00
264.00
278.00
292.00
306.00
320.00
334.00

1395.00
1522.00
1648.00
1775.00
1902.00
2029.00
2156.00
2282.00
2409.00
2536.00
2663.00
2790.00
2916.00
3043.00

1170.00
1277.00
1383.00
1490.00
1596.00
1702.00
1809.00
1915.00
2022.00
2128.00
2234.00
2341.00
2447.00
2554.00

133.00
145.00
157.00
169.00
182.00
194.00
206.00
218.00
230.00
242.00
254.00
266.00
278.00
290.00

136.00
149.00
161.00
174.00
186.00
198.00
211.00
223.00
236.00
248.00
260.00
273.00
285.00
298.00

Note: - Centering & scaffolding charges for steel scaffolding with pipes, jack props, steel centering plates for unsupported heights of every 610 mm height above 3.66 M may be allo
the applicable floor and item

Cent'g--14-15

Page 427 of 3205

scaffolding pipes, jack Props, Steel Centering Plates,etc.,


-14 (Pg.106 to 108 of Bld. Items )

SLABS above 300


mm thick

244.00
164.00
408.00

WAFFLE ARCH
ARCH
(GRID)
PERGOLA
BEAMS - up BEAMS SLABS (Rib SLABS (Only
to 1.5 M
above 1.5 M
Beams with Rib Beams)
Span
Span
Slabs)

824.00
553.00
1377.00

578.00
388.00
966.00

2276.00
1528.00
3804.00

2308.00
1550.00
3858.00

DOME
SLABS

HELICAL
STAIRCASES

3681.00
2471.00
6152.00

SHEAR
WALLS, RCC
WALLS,
WATER
TANK
WALLS

280.00
188.00
468.00

164.00
553.00
388.00
1528.00
1550.00
2471.00
188.00
0.00
180.00
608.00
457.00
1799.00
1824.00
2908.00
222.00
687.00
197.00
664.00
498.00
1962.00
1990.00
3173.00
242.00
750.00
213.00
719.00
539.00
2126.00
2156.00
3437.00
262.00
812.00
230.00
774.00
581.00
2290.00
2322.00
3702.00
282.00
874.00
246.00
830.00
623.00
2453.00
2487.00
3966.00
302.00
937.00
262.00
885.00
665.00
2616.00
2653.00
4230.00
322.00
999.00
279.00
940.00
706.00
2780.00
2819.00
4494.00
343.00
1061.00
295.00
995.00
748.00
2944.00
2985.00
4759.00
362.00
1124.00
312.00
1051.00
789.00
3107.00
3151.00
5023.00
383.00
1187.00
328.00
1106.00
830.00
3271.00
3317.00
5288.00
403.00
1249.00
344.00
1161.00
872.00
3434.00
3482.00
5552.00
423.00
1311.00
361.00
1217.00
913.00
3597.00
3648.00
5817.00
443.00
1374.00
377.00
1272.00
955.00
3762.00
3815.00
6081.00
463.00
1436.00
394.00
1327.00
996.00
3925.00
3980.00
6346.00
483.00
1498.00
height above 3.66 M may be allowed at 16.666% more than the basic material hire charges and relevant labour charges of the
50.00%

6.1 M

66.66%

6.71 M

83.33%

scaffolding pipes, jack Props, Steel Centering Plates,etc.,


r the year 2013-14
Cent'g--14-15

Page 428 of 3205


ARCH
ARCH
SLABS (GRID)
PERGOLA
BEAMS - up BEAMS above 300 SLABS (Rib SLABS (Only
to 1.5 M
above 1.5 M
mm thick Beams with Rib Beams)
Span
Span
440.00
1485.00
1040.00
4093.00
4150.00
259.00
876.00
660.00
2598.00
2635.00
699.00
2361.00
1700.00
6691.00
6785.00
259.00
285.00
311.00
337.00
363.00
389.00
414.00
440.00
466.00
492.00
518.00
544.00
570.00
596.00
622.00

876.00
964.00
1051.00
1139.00
1226.00
1314.00
1402.00
1489.00
1577.00
1664.00
1752.00
1840.00
1927.00
2015.00
2102.00

660.00
726.00
792.00
858.00
925.00
990.00
1056.00
1122.00
1188.00
1255.00
1320.00
1386.00
1452.00
1518.00
1585.00

2598.00
2858.00
3118.00
3378.00
3637.00
3897.00
4156.00
4416.00
4676.00
4936.00
5196.00
5456.00
5716.00
5975.00
6235.00

2635.00
2898.00
3161.00
3425.00
3688.00
3953.00
4216.00
4479.00
4743.00
5006.00
5269.00
5533.00
5796.00
6059.00
6323.00

DOME
SLABS
6618.00
4201.00
10819.00

HELICAL
STAIRCASES
505.00
320.00
825.00

4201.00
4621.00
5042.00
5461.00
5881.00
6302.00
6722.00
7142.00
7561.00
7982.00
8402.00
8822.00
9243.00
9662.00
10082.00

320.00
352.00
384.00
415.00
447.00
480.00
512.00
544.00
575.00
607.00
639.00
672.00
704.00
735.00
767.00

WALLS, RCC
WALLS,
WATER
TANK

992.00
1091.00
1191.00
1290.00
1389.00
1489.00
1588.00
1687.00
1786.00
1886.00
1985.00
2084.00
2184.00
2283.00
2382.00

es, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates,


ight 3.66 M for the year 2013-14
WAFFLE ARCH
ARCH
(GRID)
SLABS PERGOLA
BEAMS - up BEAMS above 300 SLABS (Rib SLABS (Only
to 1.5 M
above 1.5 M
mm thick Beams with Rib Beams)
Span
Span
Slabs)
164.00
569.00
399.00
1571.00
1593.00
130.00
465.00
327.00
1283.00
1302.00
294.00
1034.00
726.00
2854.00
2895.00
130.00

465.00

327.00

1283.00

1302.00

DOME
SLABS

HELICAL
STAIRCASES

2540.00
2076.00
4616.00

193.00
159.00
352.00

2076.00

159.00

Cent'g--14-15

SHEAR
WALLS, RCC
WALLS,
WATER
TANK
WALLS

490.00

Page 429 of 3205


143.00
156.00
169.00
182.00
195.00
208.00
221.00
234.00
247.00
260.00
273.00
286.00
299.00
312.00

511.00
558.00
604.00
651.00
697.00
743.00
790.00
836.00
883.00
929.00
975.00
1022.00
1068.00
1116.00

359.00
392.00
424.00
458.00
490.00
522.00
555.00
588.00
621.00
653.00
685.00
719.00
751.00
784.00

1412.00
1540.00
1669.00
1796.00
1925.00
2054.00
2182.00
2310.00
2438.00
2567.00
2696.00
2823.00
2952.00
3080.00

1432.00
1562.00
1693.00
1823.00
1953.00
2083.00
2213.00
2344.00
2474.00
2604.00
2734.00
2864.00
2995.00
3125.00

2284.00
2491.00
2699.00
2906.00
3114.00
3321.00
3529.00
3736.00
3945.00
4152.00
4360.00
4567.00
4775.00
4982.00

175.00
191.00
206.00
222.00
238.00
254.00
270.00
285.00
301.00
317.00
334.00
350.00
365.00
381.00

539.00
588.00
637.00
685.00
735.00
784.00
833.00
882.00
930.00
980.00
1029.00
1078.00
1127.00
1175.00

height above 3.66 M may be allowed at 16.666% more than the basic material hire charges and relevant labour charges of

Cent'g--14-15

Page 430 of 3205


CEMENT MORTARS WITH OP CEMENT
Kandukur Municipality
DATA BASED ON - 2014 - 2015 SSR
20/02/16
Qty
a

CEMENT MORTAR (1:1)


Cement
Fine aggregate sand for Mortar
Man mazdoor

Rate

1440 Kg
1.05 Cum
0.2 Nos

5.740
858.93
384.00

960 Kg
1.05 Cum
0.2 Nos

5.740
858.93
384.00

720 Kg
1.05 Cum
0.2 Nos

5.740
858.93
384.00

480 Kg
1.05 Cum
0.2 Nos

5.740
858.93
384.00

360 Kg
1.05 Cum
0.2 Nos

5.740
858.93
384.00

288 Kg
1.05 Cum
0.2 Nos

5.740
858.93
384.00

240 Kg
1.05 Cum
0.2 Nos

5.740
858.93
384.00

180 Kg
1.05 Cum
0.2 Nos

5.740
858.93
384.00

Rate per cu.m.


b

CEMENT MORTAR (1:1.5)


Cement
Fine aggregate sand for Mortar
Man mazdoor
Rate per cu.m.

CEMENT MORTAR (1:2)


Cement
Fine aggregate sand for Mortar
Man mazdoor
Rate per cu.m.

CEMENT MORTAR (1:3)


Cement
Fine aggregate sand for Mortar
Man mazdoor
Rate per cu.m.

CEMENT MORTAR (1:4)


Cement
Fine aggregate sand for Mortar
Man mazdoor
Rate per cu.m.

CEMENT MORTAR (1:5)


Cement
Fine aggregate sand for Mortar
Man mazdoor
Rate per cu.m.

CEMENT MORTAR (1:6)


Cement
Fine aggregate sand for Mortar
Man mazdoor
Rate per cu.m.

CEMENT MORTAR (1:8)


Cement
Fine aggregate sand for Mortar
Man mazdoor
Mortars,

Page 431 of 3205


Rate per cu.m.

Mortars,

Page 432 of 3205

Per

Amount

1 Kg
1 Cum
1 Nos

8265.60
901.88
76.80
Rs

1 Kg
1 Cum
1 Nos

5510.40
901.88
76.80
Rs

1 Kg
1 Cum
1 Nos

6489.08

4132.80
901.88
76.80
Rs

1 Kg
1 Cum
1 Nos

5111.48

2755.20
901.88
76.80
Rs

1 Kg
1 Cum
1 Nos

3733.88

2066.40
901.88
76.80
Rs

1 Kg
1 Cum
1 Nos

3045.08

1653.12
901.88
76.80
Rs

1 Kg
1 Cum
1 Nos

2631.80

1377.60
901.88
76.80
Rs

1 Kg
1 Cum
1 Nos

9244.28

2356.28

1033.20
901.88
76.80
Mortars,

Page 433 of 3205


Rs

2011.88

Mortars,

Ref. to SSR
Pg.No

S.No.

Item No

IRRIGATION SSR
STATEMENT OF RATES FOR MATERIALS FOR THE YEAR : 2014-15 GENERAL GUIDE

1
2
3
4
5
6
Sl No.
11

11

11

11

11

11

11

11

11

11

10

11

11
12

12

13

12

14

12

15

12

16

12

17

12

18

12

19

12

20

12

21

12

22

12

23

12

24

12

25

12

26

12

27

12
12
12

28
29

12

30

12

31

12

32

12

33

12

34

12

35

12

36

13

37

13

38

13

39

13

40

13

41

13

42

13

43

13

44

13

45

13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

14

64

14

65

14

66

14
14

67
68

14

69

14

70

14

71

14

72

14

73

14

74

14

75

14

76

14

77

14

78

14

79

14

80

14

81

14

82

15

83

15

84

15

85

15

86

15

87

15

88

15

89

15
15

90

15

91

15

92

ADDITIONAL MATERIALS FOR GATES & HOISTS FOR T


Sl No.
16

16

16

16

16

16

16

16

16

16

10

16

11

16

12

16

13

16

14

16

15

16

16

16

17

16

18

16

19

17

20

17

21

17

22

17

23

17

24

17

25

17

26

17

27

17

17

17

17

17

17

17

17

17

17

10

17

11

DETAILS OF CAPITAL COST OF MACHINERY / EQUIPMENT FO


GUIDE LINES FOR FIXING CAPITAL COST OF MACHINER
18

18
18

18

18

18

18

18

18

18

18

10

18

11

18

12

18

13

18

14

18

15

18

16

18

17

18

18

18

19

19

20

19
19

21
22

19
19

23

19

24

19

25

19

26

19

27

19

28

19

29

19

30

19

31

19

32

19

33

19

34

19
19

35

19
19

36

19

37

19

38

19

39

19

40

19

41

19

42

19

43

19

44

19

45

19

46

20

47

20

48

20

49

20

50

20

51

20

52

20

53

20

54

20

55

20
20

56

20

57

20

58

20

59

20

20

60

20
20

61

20

62

20

63

20

64

20

65

20
20

66

20

67

20

68

20
20

69

20
21

70

ACCESSORIES TO MACHINERY / EQUIPMENT FOR THE


Sl No.
21

21

21

21

21

21

21

21

21

21

10

21

11

21

12

21

13

21

14

21

15

21

16

21

17

AGGREGATE CRUSHING & PROCESSING PL


S No.
22

22

22

22

22

22

22

22

OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT FOR


Sl No.
22

22

22

22

22

22

22

22

23

23

10

23

11

23

12

23

13

23

14

23

15

23

16

23

17

23

18

23

19

23

20

23

21

23

22

23

23

23

24

23

25

23

26

23

27

23

28

23

29

23

30

23

31

MATERIALS FOR GATES AND HOISTS FOR THE YEA


Sl No.
24

24

24

24

24

24

24

24

24

24

10

24

11

24

12

24

13

Other "Over Heads" to be added in the Basic Data wherever applicab


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Materials other than covered under irriga


For the year 2014-15
GENERAL GUIDE LINES FOR REVISING RATES OF
1
2
3
4
Sl. No.
25
25

M-002
M-003

25

M-004

25

M-005

25

M-006

25

M-007

25

M-008

25

M-009

25

M-010

25

M-011

26
26

M-012
M-013

26

M-014

26

M-015

26

M-016

26

M-017

26

M-018

26

M-019

26

M-020

26

M-021

26

M-022

26

M-023

26

M-024

26

M-025

26

M-026

26

M-027

26

M-028

26

M-029

26

M-030

26

M-031

26

M-032

26

M-033

27
27

M-034
M-035

27

M-036

27

M-037

27

M-038

27
27
27

M-039
M-040
M-041

27

M-042

27

M-043

27

M-044

27

M-045

27

M-046

27

M-047

27

M-048

27

M-049

27

M-050

27

M-051

27

M-052

27

M-053

27

M-054

28

M-055

28

M-056

28

M-057

28

M-058

28

M-059

28

M-060

28

M-061

28

M-062

28

M-063

28

M-064

28

M-065

28

M-066

28

M-067

28

M-068

28

M-069

28

M-070

28

M-071

28

M-072

28

M-073

28

M-074

28

M-075

29

M-076

29

M-077

29

M-078

29

M-079

29

M-080

29
29

M-081
M-082

29

M-083

29

M-084

29

M-085

29

M-086

29

M-087

29

M-088

29

M-089

29

M-090

29
29

M-091
M-092

29

M-093

29

M-094

29

M-095

29

M-096

29

M-097

29

M-098

29

M-099

30

M-100

30

M-101

30

M-102

30
30

M-103
M-104

30

M-105

30

M-106

30
30
30

M-107

30

M-108

30
30
30

M-109

30

M-110

30

M-111

30

M-112

30

M-113

30

M-114

30

M-115

30

M-116

30

M-117

30

M-118

30

M-119

31

M-120

31

M-121

31

M-122

31

M-123

31

M-124

31

M-125

31

M-126

31

M-127

31

M-128

31

M-129

31

M-130

31

M-131

31

M-132

31

M-133

31

M-134

31

M-135

31

M-136

32

M-137

32

M-138

32

M-139

32

M-140

32

M-141

32

M-142

32

M-143

32

M-144

32

M-145

32

M-146

32

M-147

32

M-148

32

M-149

32

M-150

32

M-151

32

M-152

32

M-153

32

M-154

32

M-155

33

M-156

33

M-157

33

M-158

33

M-159

33

M-160

33

M-161

33

M-162

33

M-163

33

M-164

33

M-165

33

M-166

33

M-167

33

M-168

33

M-169

33

M-170

33

M-171

33

M-172

33

M-173

33

M-174

33

M-175

33

M-176

33

M-177

33

M-178

34

M-179

34

M-180

34

M-181

34

M-182

34
34
34

M-183

34

M-184

34

M-185

34

M-186

34

M-187

34

M-188

34

M-189

34
34

M-190

34

M-191

34

M-192

34

M-193

34

M-194

34

M-195

34

M-196

35

Item 8.3

35

Item 8.8

35

Item 8.9

35

35

35

35

35
36

5
6

S. No.
1

2
a.
b.
c.
3. a.

b.

c.
d.
e.
f.

a.
b.
c.
d.
5

a.
b.
c.
6
a.
b.
c.
7
a.
b.

8. a.

8. b.

9. a.

9. b.

10

11a

11b

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
a)

b)

32

33
34
35
36
37
38

39 a)
39 b)

40
41

42

43
a
b
c
d
e

44
a
b
c
d
e
f
g
h
i
j

45

Ref. to SSR
Pg.No

S.No.

Item No

R & B SSR

1
2

22.a
b.I

b.ii

b.iii

d I.

d II.

d.iii

d.iv

10

11

12

13

14

23.a

15

16

27

17
18

28

19

20

31

21

32.a

22

23

24

25

33.a

26

27

28

29

30

31

32

33

34

35

36
37
38
39

40

33.l

41

33.m

42

33.n

43

33.o

44

33.p

45

33a

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

33.q

61
62

63
64
65

66

67

68
69

70
71

33.w

72
73

74
75

76
77

33.z1

78

z2

79

z3

80

81

z4

82

z5

83

z6

84

z7

85

z8

86

z9

87

z10

88

z11

89

NOTE:- Add Rs. /- Per Cum for selection of stone and boulders from excavated spoil dumps for items 33
this addition of Rs. /- per Cum is allowed, deduction of Rs. /- per Cum should invariably be made towa
rubble if it is obtained from surface stone and boulders.

90

34

91

35 a

92

93

36.a

94

95

37

96

40 to 41(c )

97

42

NOTE: (1) The rates are inclusive of sales tax. 2)As per the rates applicable to the District. 3) Least of the (1) and (2
allowed 4) The price of cement will be reviewed and fixed on monthly basis and rates will be communicated separate
98

99

100

101
102

43 to 45

103
104
105
106
107

NOTE: (1) The rates are inclusive of sales tax. 2) As per the rates applicable to the District.
3) Le
4) The prices of steel will be reviewed and fixed on monthly basis and rates will be communicated separa

108

1.a

109

110

111

112

2.a.I

113

Ii

114

2.b.I

115

Ii

116

2.c.I

117

Ii

118

d.I

119

Ii

120

eI

121

Ii

122

iii

123

f.I

124

Ii

125

iii

126

3.a

127

128

129

4.a

130

b.I

131

b.ii

132

c.I

133

c.ii

134

c.iii

135

5
136

n.(i)

137

7
a)
I)

138

ii)

139

iii)

140

b)

141

I)

142

ii)

143

iii)

144

8
I)

145

ii)

146

iii)

147

AI

148

BI

149

B2

150

C1

151

1 (I )
A

152

153

154

155
156

1 (ii )
A

157

158

C
5

159

5 (a)

160

(b)

161

(c )

162

(d )

163

(e)

164
165
166
167
168
169

170

171
172
173
174
175
176
177

A
1

BMT-A.01

BMT-A.02

BMT-A.03

BMT-A.04

BMT-A.05

BMT-A.06

BMT-A.07

BMT-A.08

BMT-A.09

10

BMT-A.10

11

BMT-A.11

12

BMT-A.12

13

BMT-A.13

14

BMT-A.14

15

BMT-A.15

16

BMT-A.16

17

BMT-A.17

18

BMT-A.18

19

BMT-A.19

20

BMT-A.20

21

BMT-A.21

B
22

BMT-B.01

23
24

BMT-B.02
BMT-B.03

25

BMT-B.04

26

BMT-B.05

27

BMT-B.06

28

BMT-B.07

29

BMT-B.08

30

BMT-B.09

31

BMT-B.10

32

BMT-B.11

33

BMT-B.12

34

BMT-B.13

35

BMT-B.14

36

BMT-B.15

37

BMT-B.16

C
38

BMT-C.01

39

BMT-C.02

40

BMT-C.03

41

BMT-C.04

42

BMT-C.05

43

BMT-C.06

44

BMT-C.07

45

BMT-C.08

46

BMT-C.09

47

BMT-C.10

48

BMT-C.11

49

BMT-C.12

50

BMT-C.13

51

BMT-C.14

52

BMT-C.15

53

BMT-C.16

54

BMT-C.17

55

BMT-C.18

56

BMT-C.19

57

BMT-C.20

58

BMT-C.21

59

BMT-C.22

60

BMT-C.23

61

BMT-C.24

62

BMT-C.25

63

BMT-C.26

64

BMT-C.27

65

BMT-C.28

66

BMT-C.29

67

BMT-C.30

68

BMT-C.31

69

BMT-C.32

70

BMT-C.33

71

BMT-C.34

72

BMT-C.35

73

BMT-C.36

74

BMT-C.37

75

BMT-C.38

76

BMT-C.39

77

BMT-C.40

78

BMT-C.41

79

BMT-C.42

80

BMT-C.43

81

BMT-C.44

82

BMT-C.45

83

BMT-C.46

84

BMT-C.47

85

BMT-C.48

86

BMT-C.49

87

BMT-C.50

88

BMT-C.51

89

BMT-C.52

90

BMT-C.53

D
91

BMT-D.01

92

BMT-D.02

93

BMT-D.03

94

BMT-D.04

95

BMT-D.05

96

BMT-D.06

97

BMT-D.07

98

BMT-D.08

99

BMT-D.09

100

BMT-D.10

101

BMT-D.11

102

BMT-D.12

103

BMT-D.13

104

BMT-D.14

105

BMT-D.15

106

BMT-D.16

107

BMT-D.17

108

BMT-D.18

109

BMT-E.01

110

BMT-E.02

111

BMT-E.03

112

BMT-E.04

113

BMT-E.05

114

BMT-E.06

115

BMT-E.07

116

BMT-E.08

117

BMT-E.09

118

BMT-E.10

119

BMT-E.11

120

BMT-E.12

121

BMT-E.13

122

BMT-E.14

123

BMT-E.15

124

BMT-E.16

125

BMT-E.17

126

BMT-E.18

127

BMT-E.19

128

BMT-E.20

F
129

BMT-F.01

130

BMT-F.02

131

BMT-F.03

132

BMT-F.04

133

BMT-F.05

134

BMT-F.06

135

BMT-F.07

136

BMT-F.08

137

BMT-F.09

138

BMT-F.10

139

BMT-F.11

140

BMT-F.12

141

BMT-F.13

142

BMT-F.14

143

BMT-F.15

144

BMT-F.16

145

BMT-F.17

146

BMT-F.18

147

BMT-F.19

148

BMT-F.20

149

BMT-F.21

150

BMT-F.22

151

BMT-F.23

152

BMT-F.24

153

BMT-F.25

154

BMT-F.26

155

BMT-F.27

156

BMT-F.28

157

BMT-F.29

158

BMT-F.30

159

BMT-F.31

160

BMT-F.32

161

BMT-F.33

G
162

BMT-G.01

163

BMT-G.02

164

BMT-G.03

165

BMT-G.04

166

BMT-G.05

167

BMT-G.06

168

BMT-G.07

169

BMT-G.08

170

BMT-G.09

171

BMT-G.10

172

BMT-G.11

173

BMT-G.12

174

BMT-G.13

175

BMT-G.14

176

BMT-G.15

177

BMT-G.16

178

BMT-G.17

179

BMT-G.18

180
181
182
183
184
185
186
187
188
189

BMT-G.19
BMT-G.20
BMT-G.21
BMT-G.22
BMT-G.23
BMT-G.24
BMT-G.25
BMT-G.26
BMT-G.27
BMT-G.28

190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215

BMT-G.29
BMT-G.30
BMT-G.31
BMT-G.32
BMT-G.33
BMT-G.34
BMT-G.35
BMT-G.36
BMT-G.37
BMT-G.38
BMT-G.39
BMT-G.40
BMT-G.41
BMT-G.42
BMT-G.43
BMT-G.44
BMT-G.45
BMT-G.46
BMT-G.47
BMT-G.48
BMT-G.49
BMT-G.50
BMT-G.51
BMT-G.52
BMT-G.53
BMT-G.54

216
217
218
219
220
221
222
223
224

BMT-G.55
BMT-G.56
BMT-G.57
BMT-G.58
BMT-G.59
BMT-G.60
BMT-G.61
BMT-G.62
BMT-G.63

225

BMT-G.64

226

BMT-G.65

227

BMT-G.66

228

BMT-G.67

229

BMT-G.68

230

BMT-G.69

231

BMT-G.70

232

BMT-G.71

233

BMT-G.72

234

BMT-G.73

235

BMT-G.74

236

BMT-G.75

237

BMT-G.76

238

BMT-G.77

239

BMT-G.78

240

BMT-G.79

241

BMT-H.01

242

BMT-H.02

243

BMT-H.03

244

BMT-H.04

245

BMT-H.05

246

BMT-H.06

247

BMT-H.07

248

BMT-H.08

249

BMT-H.09

250

BMT-H.10

251

BMT-H.11

252

BMT-H.12

253

BMT-H.13

254

BMT-H.14

255

BMT-H.15

256

BMT-H.16

257

BMT-H.17

258

BMT-H.18

259

BMT-H.19

260

BMT-H.20

261

BMT-H.21

262

BMT-H.22

263

BMT-H.23

264

BMT-H.24

265

BMT-H.25

266

BMT-H.26

267

BMT-H.27

268

BMT-H.28

269

BMT-H.29

270

BMT-H.30

271

BMT-H.31

272

BMT-H.32

273

BMT-H.33

274

BMT-H.34

275

BMT-H.35

276

BMT-H.36

277

BMT-H.37

278

BMT-H.38

279

BMT-H.39

280

BMT-H.40

281

BMT-H.41

282

BMT-H.42

283

BMT-H.43

284

BMT-H.44

285

BMT-H.45

286

BMT-H.46

287

BMT-H.47

288

BMT-H.48

289

BMT-H.49

290

BMT-H.50

291

BMT-H.51

292

BMT-H.52

293

BMT-H.53

294

BMT-H.54

295

BMT-H.55

296

BMT-H.56

297

BMT-H.57

298

BMT-H.58

299

BMT-H.59

300

BMT-H.60

301

BMT-H.61

302

BMT-H.62

303

BMT-H.63

304
305
306
307

BMT-H.64
BMT-H.65
BMT-H.66
BMT-H.67

308
309
310

BMT-H.68
BMT-H.69
BMT-H.70

311
312

BMT-H.71
BMT-H.72

313

BMT-H.73

314

BMT-H.74

315
316

BMT-H.75
BMT-H.76

317

BMT-H.77

318

BMT-H.78

319

BMT-H.79

320
321
322
323

BMT-H.80
BMT-H.81
BMT-H.82
BMT-H.83

324

BMT-H.84

325

BMT-H.85

326

BMT-H.86

327

BMT-H.87

328

BMT-H.88

329

BMT-H.89

330

BMT-H.90

331

BMT-H.91

332

BMT-H.92

333

BMT-H.93

334

BMT-H.94

335

BMT-H.95

336

BMT-H.96

337

BMT-H.97

338

BMT-H.98

339

BMT-H.99

340

BMT-H.100

341

BMT-H.101

342

BMT-H.102

343

BMT-H.103

344

BMT-H.104

345

BMT-H.105

346

BMT-H.106

347

BMT-H.107

348

BMT-H.108

I
349

BMT-I.01

350

BMT-I.02

351

BMT-I.03

352

BMT-I.04

353

BMT-I.05

354

BMT-I.06

355

BMT-I.07

356

BMT-I.08

357

BMT-I.09

358

BMT-I.10

359

BMT-I.11

360

BMT-I.12

361

BMT-I.13

362

BMT-I.14

363

BMT-I.15

364

BMT-I.16

365

BMT-I.17

366

BMT-I.18

367

BMT-I.19

368

BMT-I.20

369

BMT-I.21

J
370

BMT-J.01

371

BMT-J.02

372

BMT-J.03

373

BMT-J.04

374

BMT-J.05

375

BMT-J.06

376

BMT-J.07

377

BMT-J.08

378

BMT-J.09

379

BMT-J.10

380

BMT-J.11

381

BMT-J.12

382

BMT-J.13

383

BMT-J.14

384

BMT-J.15

385

BMT-J.16

386

BMT-J.17

387

BMT-J.18

388

BMT-J.19

389

BMT-J.20

390

BMT-J.21

391

BMT-J.22

392

BMT-J.23

393

BMT-J.24

394

BMT-J.25

395

BMT-J.26

396

BMT-J.27

397

BMT-J.28

398

BMT-J.29

399

BMT-J.30

400

BMT-J.31

401

BMT-J.32

402

BMT-J.33

403

BMT-J.34

404

BMT-J.35

405

BMT-J.36

406

BMT-J.37

407

BMT-J.38

408

BMT-J.39

409

BMT-J.40

410

BMT-J.41

411

BMT-J.42

412

BMT-J.43

413

BMT-J.44

414

BMT-J.45

415

BMT-J.46

416

BMT-J.47

417

BMT-J.48

418

BMT-J.49

419

BMT-J.50

420

BMT-J.51

K
421

BMT-K.01

422

BMT-K.02

423

BMT-K.03

424

BMT-K.04

425

BMT-K.05

426

BMT-K.06

427

BMT-K.07

428

BMT-K.08

429

BMT-K.09

430

BMT-K.10

431

BMT-K.11

432

BMT-K.12

433

BMT-K.13

434

BMT-K.14

435

BMT-K.15

436

BMT-K.16

437

BMT-K.17

438

BMT-K.18

439

BMT-K.19

440

BMT-K.20

441

BMT-K.21

442

BMT-K.22

443

BMT-K.23

444

BMT-K.24

445

BMT-K.25

446

BMT-K.26

447

BMT-K.27

448

BMT-K.28

449

BMT-K.29

450

BMT-K.30

451

BMT-K.31

452

BMT-K.32

453

BMT-K.33

454
455
456
457
458
459
460
461
462
463
464
465
466

BMT-K.34
BMT-K.35
BMT-K.36
BMT-K.37
BMT-K.38
BMT-K.39
BMT-K.40
BMT-K.41
BMT-K.42
BMT-K.43
BMT-K.44
BMT-K.45
BMT-K.46

467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506

BMT-K.47
BMT-K.48
BMT-K.49
BMT-K.50
BMT-K.51
BMT-K.52
BMT-K.53
BMT-K.54
BMT-K.55
BMT-K.56
BMT-K.57
BMT-K.58
BMT-K.59
BMT-K.60
BMT-K.61
BMT-K.62
BMT-K.63
BMT-K.64
BMT-K.65
BMT-K.66
BMT-K.67
BMT-K.68
BMT-K.69
BMT-K.70
BMT-K.71
BMT-K.72
BMT-K.73
BMT-K.74
BMT-K.75
BMT-K.76
BMT-K.77
BMT-K.78
BMT-K.79
BMT-K.80
BMT-K.81
BMT-K.82
BMT-K.83
BMT-K.84
BMT-K.85
BMT-K.86

507

BMT-K.87

508
509
510
511
512
513
514
515

BMT-K.88
BMT-K.89
BMT-K.90
BMT-K.91
BMT-K.92
BMT-K.93
BMT-K.94
BMT-K.95

516

BMT-K.96

517

BMT-K.97

518

BMT-K.98

519

BMT-K.99

520

BMT-K.100

521

BMT-K.101

522

BMT-K.102

523

BMT-K.103

524

BMT-K.104

525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541

BMT-K.105
BMT-K.106
BMT-K.107
BMT-K.108
BMT-K.109
BMT-K.110
BMT-K.111
BMT-K.112
BMT-K.113
BMT-K.114
BMT-K.115
BMT-K.116
BMT-K.117
BMT-K.118
BMT-K.119
BMT-K.120
BMT-K.121

542

BMT-K.122

543

BMT-K.123

544

BMT-K.124

L
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553

BMT-L.01
BMT-L.02
BMT-L.03
BMT-L.04
BMT-L.05
BMT-L.06
BMT-L.07
BMT-L.08
BMT-L.09
BMT-L.10
BMT-L.11
BMT-L.12
BMT-L.13
BMT-L.14
BMT-L.15

554

BMT-L.16

555

BMT-L.17

556

BMT-L.18

557

BMT-L.19

558

BMT-L.20

M
559

BMT-M.01

560

BMT-M.02

561

BMT-M.03

562

BMT-M.04

563

BMT-M.05

564

BMT-M.06

565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586

BMT-M.07
BMT-M.08
BMT-M.09
BMT-M.10
BMT-M.11
BMT-M.12
BMT-M.13
BMT-M.14
BMT-M.15
BMT-M.16
BMT-M.17
BMT-M.18
BMT-M.19
BMT-M.20
BMT-M.21
BMT-M.22
BMT-M.23
BMT-M.24
BMT-M.25
BMT-M.26
BMT-M.27
BMT-M.28

587

BMT-M.29

588

BMT-M.30

589

BMT-M.31

590

BMT-M.32

591

BMT-M.33

592

BMT-M.34

593

BMT-M.35

594

BMT-M.36

595

BMT-M.37

596

BMT-M.38

597

BMT-M.39

598

BMT-M.40

599

BMT-M.41

600
601
602
603

BMT-M.42
BMT-M.43
BMT-M.44
BMT-M.45

604

BMT-M.46

605

BMT-M.47

606

BMT-M.48

607

BMT-M.49

608

BMT-M.50

609

BMT-M.51

610

BMT-M.52

611

BMT-M.53

612

BMT-M.54

613

BMT-M.55

614

BMT-M.56

615

BMT-M.57

616

BMT-M.58

617

BMT-M.59

618

BMT-M.60

619

BMT-M.61

620

BMT-M.62

621

BMT-M.63

622

BMT-M.64

623

BMT-M.65

624

BMT-M.66

625

BMT-M.67

626

BMT-M.68

627

BMT-M.69

628

BMT-M.70

629

BMT-M.71

630

BMT-M.72

631

BMT-M.73

632

BMT-M.74

633

BMT-M.75

634

BMT-M.76

635

BMT-M.77

636

BMT-M.78

637

BMT-M.79

638

BMT-M.80

639

BMT-M.81

640

BMT-M.82

641

BMT-M.83

642

BMT-M.84

643

BMT-M.85

644

BMT-M.86

645

BMT-M.87

646

BMT-M.88

647

BMT-M.89

648

BMT-M.90

649

BMT-M.91

650

BMT-M.92

651

BMT-M.93

652

BMT-M.94

653

BMT-M.95

654

BMT-M.96

655

BMT-M.97

656

BMT-M.98

657

BMT-M.99

658

BMT-M.100

659

BMT-M.101

660

BMT-M.102

661

BMT-M.103

662

BMT-M.104

663

BMT-M.105

664

BMT-M.106

665

BMT-M.107

666

BMT-M.108

667

BMT-M.109

668

BMT-M.110

669

BMT-M.111

670

BMT-M.112

671

BMT-M.113

672

BMT-M.114

673

BMT-M.115

674

BMT-M.116

N
675

BMT-N.01

676

BMT-N.02

677

BMT-N.03

678

BMT-N.04

679

BMT-N.05

680

BMT-N.06

681

BMT-N.07

682

BMT-N.08

683

BMT-N.09

684

BMT-N.10

685

BMT-N.11

686

BMT-N.12

687

BMT-N.13

688

BMT-N.14

689

BMT-N.15

690

BMT-N.16

691

BMT-N.17

692

BMT-N.18

693

BMT-N.19

694

BMT-N.20

695

BMT-N.21

696

BMT-N.22

697

BMT-N.23

698

BMT-N.24

699

BMT-N.25

700

BMT-N.26

701

BMT-N.27

702

BMT-N.28

703

BMT-N.29

704

BMT-N.30

705

BMT-N.31

706

BMT-N.32

707

BMT-N.33

708

BMT-N.34

709

BMT-N.35

710

BMT-N.36

711

BMT-N.37

712

BMT-N.38

713

BMT-N.39

714

BMT-N.40

715

BMT-N.41

716

BMT-N.42

717

BMT-N.43

718

BMT-N.44

719

BMT-N.45

720

BMT-N.46

721

BMT-N.47

722

BMT-N.48

723

BMT-N.49

724

BMT-N.50

725

BMT-N.51

726

BMT-N.52

727

BMT-N.53

728

BMT-N.54

729

BMT-N.55

730

BMT-N.56

731

BMT-N.57

732

BMT-N.58

733

BMT-N.59

734

BMT-N.60

735

BMT-N.61

736

BMT-N.62

737

BMT-N.63

738

BMT-N.64

739

BMT-N.65

740

BMT-N.66

741

BMT-N.67

742

BMT-N.68

743

BMT-N.69

744

BMT-N.70

745

BMT-N.71

746

BMT-N.72

747

BMT-N.73

748

BMT-N.74

749
750

BMT-N.75
BMT-N.76

751

BMT-N.77

752

BMT-N.78

753

BMT-N.79

754

BMT-N.80

755

BMT-N.81

756

BMT-N.82

757

BMT-N.83

758

BMT-N.84

759

BMT-N.85

760

BMT-N.86

761

BMT-N.87

762

BMT-N.88

763

BMT-P.01

764

BMT-P.02

765

BMT-P.03

766

BMT-P.04

767

BMT-P.05

768

BMT-P.06

769

BMT-P.07

770

BMT-P.08

771

BMT-P.09

772

BMT-P.10

773

BMT-P.11

774

BMT-P.12

775

BMT-P.13

776

BMT-P.14

777

BMT-P.15

778

BMT-P.16

779

BMT-P.17

780

BMT-P.18

781

BMT-P.19

782

BMT-P.20

783

BMT-P.21

784

BMT-P.22

785

BMT-P.23

786

BMT-P.24

787

BMT-P.25

788

BMT-P.26

789

BMT-P.27

790

BMT-P.28

791

BMT-P.29

792

BMT-P.30

793

BMT-P.31

794

BMT-P.32

795

BMT-P.33

796

BMT-P.34

797

BMT-P.35

798

BMT-P.36

799

BMT-P.37

800

BMT-P.38

801

BMT-P.39

802

BMT-P.40

803

BMT-P.41

804

BMT-P.42

805

BMT-P.43

806

BMT-P.44

807

BMT-P.45

808

BMT-P.46

809

BMT-P.47

810

BMT-P.48

811

BMT-P.49

812

BMT-P.50

813

BMT-P.51

814

BMT-P.52

815

BMT-P.53

816

BMT-P.54

817

BMT-P.55

818

BMT-P.56

819

BMT-P.57

820

BMT-P.58

821

BMT-P.59

822

BMT-P.60

823

BMT-P.61

824

BMT-P.62

825

BMT-P.63

826

BMT-P.64

827

BMT-P.65

828

BMT-P.66

829

BMT-P.67

830

BMT-P.68

831

BMT-P.69

832

BMT-P.70

833

BMT-P.71

834

BMT-P.72

835

BMT-P.73

836

BMT-P.74

837

BMT-P.75

838

BMT-P.76

839

BMT-P.77

840

BMT-P.78

841

BMT-P.79

842

BMT-P.80

843

BMT-P.81

844

BMT-P.82

845

BMT-P.83

846

BMT-P.84

847

BMT-P.85

848

BMT-P.86

849

BMT-P.87

850

BMT-P.88

851

BMT-P.89

852

BMT-P.90

853

BMT-P.91

854

BMT-P.92

855

BMT-P.93

856

BMT-P.94

857

BMT-P.95

858

BMT-P.96

859

BMT-P.97

860

BMT-P.98

861

BMT-P.99

862

BMT-P.100

863

BMT-P.101

864

BMT-P.102

865

BMT-P.103

866

BMT-P.104

867

BMT-P.105

868

BMT-P.106

869

BMT-P.107

870

BMT-P.108

871

BMT-P.109

872

BMT-P.110

873

BMT-P.111

874

BMT-P.112

Q
875

BMT-Q.01

876

BMT-Q.02

877

BMT-Q.03

878

BMT-Q.04

879

BMT-Q.05

880

BMT-Q.06

881

BMT-Q.07

882

BMT-Q.08

883

BMT-Q.09

884

BMT-Q.10

885

BMT-Q.11

886

BMT-Q.12

887

BMT-Q.13

888

BMT-Q.14

889

BMT-Q.15

S
890

BMT-S.01

891

BMT-S.02

892

BMT-S.03

893

BMT-S.04

894

BMT-S.05

895

BMT-S.06

896

BMT-S.07

897

BMT-S.08

898

BMT-S.09

899

BMT-S.10

900

BMT-S.11

901

BMT-S.12

902

BMT-S.13

903

BMT-S.14

904

BMT-S.15

905

BMT-T.01

906

BMT-T.02

907

BMT-T.03

908

BMT-T.04

909

BMT-T.05

U
910

BMT-U.01

911

BMT-U.02

912

BMT-U.03

913

BMT-U.04

914

BMT-U.05

915

BMT-U.06

916

BMT-U.07

917

BMT-U.08

918

BMT-U.09

919

BMT-U.10

920

BMT-U.11

V
921

BMM-V.01

922

BMM-V.02

923

BMM-V.03

924

BMM-V.04

925

BMM-V.05

926

BMM-V.06

927

BMM-V.07

928

BMM-V.08

929

BMM-V.09

930

BMM-V.10

931

BMM-V.11

932

BMM-V.12

933

BMM-V.13

934

BMM-V.14

935

BMM-V.15

936

BMM-V.16

937

BMM-V.17

938

BMM-V.18

939

BMM-V.19

940

BMM-V.20

941

BMM-V.21

942

BMM-V.22

943

BMM-V.23

944

BMM-V.24

945

BMM-V.25

946

BMM-V.26

947

BMM-V.27

948

BMM-V.28

949

BMM-V.29

950

BMM-V.30

951

BMM-V.31

952

BMM-V.32

953

BMM-V.33

954

BMM-V.34

955

BMM-V.35

956

BMM-V.36

957

BMM-V.37

958

BMM-V.38

959

BMM-V.39

960

BMM-V.40

961

BMM-V.41

962

BMM-V.42

963

BMM-V.43

964

BMM-V.44

965

BMM-V.45

966

BMM-V.46

967

BMM-V.47

968

BMM-V.48

969

BMM-V.49

970

BMM-V.50

W
945

BMS-W.01

946

BMS-W.02

947

BMS-W.03

948

BMS-W.04

949

BMS-W.05

950

BMS-W.06

951

BMS-W.07

952

BMS-W.08

953

BMS-W.09

954

BMS-W.10

955

BMS-W.11

956

BMS-W.12

957

BMS-W.13

958

BMS-W.14

959

BMS-W.15

960

BMS-W.16

961

BMS-W.17

962

BMS-W.18

963

BMS-W.19

964

BMS-W.20

965

BMS-W.21

966

BMS-W.22

967

BMS-W.23

968

BMS-W.24

969

BMS-W.25

970

BMS-W.26

971

BMS-W.27

972

BMS-W.28

973

BMS-W.29

974

BMS-W.30

975

BMS-W.31

976

BMS-W.32

977

BMS-W.33

978

BMS-W.34

979

BMS-W.35

980

BMS-W.36

981

BMS-W.37

982

BMS-W.38

983

BMS-W.39

984

BMS-W.40

985

BMS-W.41

986

BMS-W.42

987

BMS-W.43

988

BMS-W.44

989

BMS-W.45

990
991

BMS-W.46
BMS-W.47

992

BMS-W.48

993

BMS-W.49

994

BMS-W.50

995

BMS-W.51

996

BMS-W.52

997

BMS-W.53

998

BMS-W.54

999

BMS-W.55

1,000

BMS-W.56

1,001

BMS-W.57

1,002

BMS-W.58

1,003

BMS-W.59

1,004

BMS-W.60

1,005

BMS-W.61

1,006

BMS-W.62

1,007

BMS-W.63

1,008

BMS-W.64

1,009

BMS-W.65

1,010

BMS-W.66

1,011

BMS-W.67

1,049

BMS-W.68

1,049

BMS-W.69

1,049

BMS-W.70

1,049

BMS-W.71

1,049

BMS-W.72

1,049

BMS-W.73

1,049

BMS-W.74

1,049

BMS-W.75

1,049

BMS-W.76

1,049

BMS-W.77

1,049

BMS-W.78

1,049

BMS-W.79

1,049

BMS-W.80

X
1,050

BMC-X.01

1,051

BMC-X.02

1,052

BMC-X.03

1,053

BMC-X.04

1,054

BMC-X.05

1,055

BMC-X.06

1,056

BMC-X.07

1,057

BMC-X.08

1,058

BMC-X.09

1,059

BMC-X.10

1,060

BMC-X.11

1,061

BMC-X.12

WATER SUPPLY & SANITARY ITEMS


Sl.No
1

Item Code
2

A
1

BMW-A.01

BMW-A.02

BMW-A.03

BMW-A.04

BMW-A.05

BMW-A.06

BMW-A.07

BMW-A.08

BMW-A.09

10

BMW-A.10

11

BMW-A.11

12

BMW-A.12

13

BMW-A.13

14

BMW-A.14

15

BMW-A.15

16

BMW-A.16

17

BMW-A.17

18

BMW-A.18

19

BMW-A.19

20

BMW-A.20

21

BMW-A.21

22

BMW-A.22

23

BMW-A.23

24

BMW-A.24

25

BMW-A.25

26

BMW-A.26

27

BMW-A.27

28

BMW-A.28

29

BMW-A.29

30

BMW-A.30

31

BMW-A.31

32

BMW-A.32

33

BMW-A.33

34

BMW-A.34

35

BMW-A.35

36

BMW-A.36

37

BMW-A.37

38

BMW-A.38

39

BMW-A.39

40

BMW-A.40

41

BMW-A.41

42

BMW-A.42

43

BMW-A.43

44

BMW-A.44

45

BMW-A.45

46

BMW-A.46

47

BMW-A.47

48

BMW-A.48

49

BMW-A.49

50

BMW-A.50

51

BMW-A.51

52

BMW-A.52

53

BMW-A.53

54

BMW-A.54

55

BMW-A.55

56

BMW-A.56

57

BMW-A.57

58

BMW-A.58

59

BMW-A.59

60

BMW-A.60

61

BMW-A.61

62

BMW-A.62

63

BMW-A.63

64

BMW-A.64

65

BMW-A.65

66

BMW-A.66

67

BMW-A.67

68

BMW-A.68

69

BMW-A.69

70

BMW-A.70

71

BMW-A.71

72

BMW-A.72

73

BMW-A.73

74

BMW-A.74

75

BMW-A.75

76

BMW-A.76

77

BMW-A.77

B
78

BMW-B.01

79

BMW-B.02

80

BMW-B.03

81

BMW-B.04

82

BMW-B.05

83

BMW-B.06

84

BMW-B.07

85

BMW-B.08

86

BMW-C.01

87

BMW-C.02

88

BMW-C.03

89

BMW-C.04

90

BMW-C.05

91

BMW-C.06

92

BMW-C.07

93

BMW-C.08

94

BMW-C.09

95

BMW-C.10

96

BMW-C.11

97

BMW-C.12

98

BMW-C.13

99

BMW-C.14

100

BMW-C.15

101

BMW-C.16

102

BMW-C.17

103

BMW-C.18

104

BMW-C.19

105

BMW-C.20

106

BMW-C.21

107

BMW-C.22

108

BMW-C.23

109

BMW-C.24

110

BMW-C.25

111

BMW-C.26

112

BMW-C.27

113

BMW-C.28

114

BMW-C.29

115

BMW-C.30

116

BMW-C.31

117

BMW-C.32

118

BMW-C.33

119

BMW-C.34

120

BMW-C.35

121

BMW-C.36

122

BMW-C.37

123

BMW-C.38

124

BMW-C.39

125

BMW-C.40

126

BMW-C.41

127

BMW-C.42

128

BMW-C.43

129

BMW-C.44

130

BMW-C.45

131

BMW-C.46

132

BMW-C.47

D
133

BMW-D.01

134

BMW-D.02

135

BMW-D.03

136

BMW-D.04

137

BMW-D.05

138

BMW-D.06

139

BMW-D.07

140

BMW-D.08

141

BMW-D.09

142

BMW-D.10

143

BMW-D.11

144

BMW-D.12

145

BMW-D.13

146

BMW-D.14

147

BMW-D.15

148

BMW-D.16

149

BMW-D.17

150

BMW-D.18

151

BMW-D.19

152

BMW-D.20

153

BMW-D.21

154

BMW-D.22

155

BMW-D.23

156

BMW-D.24

157

BMW-D.25

158

BMW-D.26

159

BMW-D.27

160

BMW-D.28

161

BMW-D.29

162

BMW-D.30

163

BMW-D.31

164

BMW-D.32

165

BMW-D.33

166

BMW-D.34

167

BMW-D.35

168

BMW-D.36

169

BMW-D.37

170

BMW-D.38

171

BMW-D.39

172

BMW-D.40

173

BMW-D.41

E
174

BMW-E.01

175
176

BMW-E.02
BMW-E.03

177

BMW-E.04

178

BMW-E.05

179

BMW-E.06

180

BMW-E.07

181

BMW-E.08

182

BMW-E.09

183

BMW-E.10

184

BMW-E.11

185

BMW-E.12

186

BMW-E.13

187

BMW-E.14

188

BMW-E.15

189

BMW-E.16

190

BMW-E.17

191

BMW-E.18

192

BMW-E.19

193

BMW-E.20

194

BMW-E.21

195

BMW-E.22

196

BMW-E.23

197

BMW-E.24

198

BMW-E.25

199

BMW-E.26

200

BMW-E.27

201

BMW-E.28

202

BMW-E.29

203

BMW-E.30

204

BMW-E.31

205

BMW-E.32

206

BMW-E.33

207

BMW-E.34

208

BMW-E.35

209

BMW-E.36

210

BMW-E.37

211

BMW-E.38

F
212

BMW-F.01

213

BMW-F.02

214

BMW-F.03

215

BMW-F.04

216

BMW-F.05

217

BMW-F.06

218

BMW-F.07

219

BMW-F.08

220

BMW-F.09

221

BMW-F.10

222

BMW-F.11

223
224

BMW-F.12
BMW-F.13

225
226

BMW-F.14
BMW-F.15

227

BMW-F.16

228

BMW-F.17

229

BMW-F.18

230

BMW-F.19

231
232

BMW-F.20
BMW-F.21

233
234

BMW-F.22
BMW-F.23

235
236

BMW-F.24
BMW-F.25

237
238

BMW-F.26
BMW-F.27

239
240

BMW-F.28
BMW-F.29

241
242

BMW-F.30
BMW-F.31

243
244

BMW-F.32
BMW-F.33

245

BMW-F.34

246

BMW-F.35

247

BMW-F.36

248

BMW-F.37

249

BMW-F.38

250

BMW-F.39

251

BMW-F.40

252

BMW-F.41

253

BMW-F.42

254

BMW-F.43

255

BMW-F.44

256

BMW-F.45

257

BMW-F.46

258

BMW-F.47

259

BMW-F.48

260

BMW-F.49

261

BMW-F.50

262

BMW-F.51

263

BMW-F.52

264

BMW-F.53

265

BMW-F.54

266

BMW-F.55

267

BMW-F.56

268

BMW-F.57

269

BMW-F.58

270

BMW-F.59

271

BMW-F.60

272

BMW-F.61

273

BMW-F.62

274

BMW-F.63

275

BMW-F.64

276

BMW-F.65

277

BMW-F.66

278

BMW-F.67

279

BMW-F.68

280

BMW-F.69

281

BMW-F.70

282

BMW-F.71

283

BMW-F.72

284

BMW-F.73

285
286

BMW-F.74
BMW-F.75

287

BMW-F.76

288

BMW-F.77

289

BMW-F.78

290

BMW-F.79

291

BMW-F.80

292

BMW-F.81

293

BMW-F.82

294

BMW-F.83

295

BMW-F.84

296

BMW-F.85

297

BMW-F.86

298

BMW-F.87

299

BMW-F.88

300

BMW-F.89

301

BMW-F.90

302

BMW-F.91

303

BMW-F.92

304

BMW-F.93

305

BMW-F.94

306

BMW-F.95

307

BMW-F.96

308

BMW-F.97

309

BMW-F.98

310

BMW-F.99

311

BMW-F.100

312

BMW-F.101

313

BMW-F.102

314

BMW-F.103

315

BMW-F.104

316

BMW-F.105

317

BMW-F.106

318

BMW-F.107

319

BMW-F.108

320

BMW-F.109

321

BMW-F.110

322

BMW-F.111

323

BMW-F.112

324

BMW-F.113

325

BMW-F.114

326

BMW-F.115

327

BMW-F.116

328
329

BMW-F.117
BMW-F.118

330
331

BMW-F.119
BMW-F.120

332

BMW-F.121

333

BMW-F.122

334

BMW-F.123

335

BMW-G.01

336

BMW-G.02

337

BMW-G.03

338

BMW-G.04

339

BMW-G.05

340

BMW-G.06

341

BMW-G.07

342

BMW-G.08

343

BMW-G.09

344

BMW-G.10

345

BMW-G.11

346

BMW-G.12

347

BMW-G.13

348

BMW-G.14

349

BMW-G.15

350

BMW-G.16

351

BMW-G.17

352

BMW-G.18

353

BMW-G.19

354

BMW-G.20

355

BMW-G.21

356

BMW-G.22

357

BMW-G.23

358

BMW-G.24

359

BMW-G.25

360

BMW-G.26

361

BMW-G.27

362

BMW-G.28

363

BMW-G.29

364

BMW-G.30

365

BMW-G.31

366

BMW-G.32

367

BMW-G.33

368

BMW-G.34

369

BMW-G.35

370

BMW-G.36

371

BMW-G.37

372

BMW-G.38

373

BMW-G.39

374

BMW-G.40

375

BMW-G.41

376

BMW-G.42

377

BMW-G.43

378

BMW-G.44

379

BMW-G.45

380

BMW-G.46

381

BMW-G.47

382

BMW-G.48

383

BMW-G.49

384

BMW-G.50

385

BMW-G.51

386

BMW-G.52

387

BMW-G.53

388

BMW-G.54

389

BMW-G.55

390

BMW-G.56

391

BMW-G.57

392

BMW-G.58

393

BMW-G.59

394

BMW-G.60

395

BMW-G.61

396

BMW-G.62

397

BMW-G.63

398

BMW-G.64

399

BMW-G.65

400

BMW-G.66

401

BMW-G.67

402

BMW-G.68

403

BMW-G.69

404

BMW-G.70

405

BMW-G.71

406

BMW-G.72

407

BMW-G.73

408

BMW-G.74

409

BMW-G.75

410

BMW-G.76

411

BMW-G.77

412

BMW-G.78

413

BMW-G.79

414

BMW-G.80

415

BMW-G.81

416

BMW-G.82

417

BMW-G.83

418

BMW-G.84

419

BMW-G.85

420

BMW-G.86

421

BMW-G.87

422

BMW-G.88

423

BMW-G.89

424

BMW-G.90

425

BMW-G.91

426

BMW-G.92

427

BMW-G.93

428

BMW-G.94

429

BMW-G.95

430

BMW-G.96

431

BMW-G.97

432

BMW-G.98

433

BMW-G.99

434

BMW-G.100

435

BMW-G.101

436

BMW-G.102

437

BMW-G.103

438

BMW-G.104

439

BMW-G.105

440

BMW-G.106

441

BMW-G.107

442

BMW-G.108

443

BMW-G.109

444

BMW-G.110

445

BMW-G.111

446

BMW-G.112

447

BMW-G.113

448

BMW-G.114

449

BMW-G.115

450

BMW-G.116

451

BMW-G.117

452

BMW-G.118

453

BMW-G.119

454

BMW-G.120

455

BMW-G.121

456

BMW-G.122

457

BMW-G.123

458

BMW-G.124

459

BMW-G.125

460

BMW-G.126

461

BMW-G.127

462

BMW-G.128

463

BMW-G.129

464

BMW-G.130

465

BMW-G.131

466

BMW-G.132

467

BMW-G.133

468

BMW-G.134

469

BMW-G.135

470

BMW-G.136

471

BMW-G.137

472

BMW-G.138

473

BMW-G.139

474

BMW-G.140

475

BMW-G.141

476

BMW-G.142

477

BMW-G.143

478

BMW-G.144

479

BMW-G.145

480

BMW-G.146

481

BMW-G.147

482

BMW-G.148

483

BMW-G.149

484

BMW-G.150

485

BMW-G.151

486

BMW-G.152

H
487

BMW-H.01

488

BMW-H.02

489

BMW-H.03

490

BMW-H.04

491

BMW-H.05

492

BMW-H.06

493

BMW-H.07

494

BMW-H.08

495

BMW-H.09

496

BMW-H.10

497

BMW-H.11

498

BMW-H.12

499

BMW-H.13

500

BMW-H.14

501

BMW-H.15

502

BMW-H.16

503

BMW-H.17

504

BMW-H.18

505

BMW-H.19

506

BMW-H.20

507

BMW-H.21

508

BMW-H.22

509

BMW-H.23

510

BMW-H.24

511

BMW-H.25

512

BMW-H.26

513

BMW-H.27

514

BMW-H.28

515

BMW-H.29

516

BMW-H.30

517

BMW-H.31

518

BMW-H.32

519

BMW-H.33

520

BMW-H.34

521

BMW-H.35

522

BMW-H.36

523

BMW-H.37

524

BMW-H.38

525

BMW-H.39

526

BMW-H.40

527

BMW-H.41

528

BMW-H.42

529

BMW-H.43

530

BMW-H.44

531

BMW-H.45

532

BMW-H.46

533

BMW-H.47

534

BMW-H.48

535

BMW-H.49

536

BMW-H.50

537

BMW-H.51

538

BMW-H.52

539

BMW-H.53

540

BMW-H.54

541

BMW-H.55

542

BMW-H.56

543

BMW-H.57

544

BMW-H.58

545

BMW-H.59

546

BMW-H.60

547

BMW-H.61

548

BMW-H.62

549

BMW-H.63

550

BMW-H.64

551

BMW-H.65

552

BMW-H.66

553

BMW-H.67

554

BMW-H.68

555

BMW-H.69

556

BMW-H.70

557

BMW-H.71

558

BMW-H.72

559

BMW-H.73

560

BMW-H.74

561

BMW-H.75

562

BMW-H.76

563

BMW-H.77

564

BMW-H.78

565

BMW-H.79

566

BMW-H.80

567

BMW-H.81

568

BMW-H.82

569

BMW-H.83

570

BMW-H.84

571

BMW-H.85

572

BMW-H.86

573

BMW-H.87

574

BMW-H.88

575

BMW-H.89

576

BMW-H.90

577

BMW-H.91

578

BMW-H.92

579

BMW-H.93

580

BMW-H.94

581

BMW-H.95

582

BMW-H.96

583

BMW-H.97

584

BMW-H.98

585

BMW-H.99

586

BMW-H.100

587

BMW-H.101

588

BMW-H.102

589

BMW-H.103

590

BMW-H.104

591

BMW-H.105

592

BMW-H.106

593

BMW-H.107

594

BMW-H.108

I
595

BMW-I.01

596

BMW-I.02

597

BMW-I.03

598

BMW-I.04

599

BMW-I.05

600

BMW-I.06

601

BMW-I.07

602

BMW-I.08

603

BMW-I.09

604

BMW-I.10

605

BMW-I.11

606

BMW-I.12

607

BMW-I.13

608

BMW-I.14

609

BMW-I.15

610

BMW-I.16

611

BMW-I.17

612

BMW-I.18

613

BMW-I.19

614

BMW-I.20

615

BMW-I.21

616

BMW-I.22

617

BMW-I.23

618

BMW-I.24

619

BMW-I.25

620

BMW-I.26

621

BMW-I.27

622

BMW-I.28

623

BMW-I.29

624

BMW-I.30

625

BMW-I.31

626

BMW-I.32

627

BMW-I.33

628

BMW-I.34

629

BMW-I.35

630

BMW-I.36

631

BMW-I.37

632

BMW-I.38

633

BMW-I.39

634

BMW-I.40

635

BMW-I.41

636

BMW-I.42

637

BMW-I.43

638

BMW-I.44

639

BMW-I.45

640

BMW-I.46

641

BMW-I.47

642

BMW-I.48

643

BMW-I.49

644

BMW-I.50

645

BMW-I.51

646

BMW-I.52

647

BMW-I.53

648

BMW-I.54

649

BMW-I.55

650

BMW-I.56

651

BMW-I.57

652

BMW-I.58

653

BMW-I.59

654

BMW-I.60

655

BMW-I.61

656

BMW-I.62

657

BMW-I.63

658

BMW-I.64

659

BMW-I.65

660

BMW-I.66

661

BMW-I.67

662

BMW-I.68

663

BMW-I.69

664

BMW-I.70

665

BMW-I.71

666

BMW-I.72

667

BMW-I.73

668

BMW-I.74

669

BMW-I.75

670

BMW-I.76

671

BMW-I.77

672

BMW-I.78

673

BMW-I.79

674

BMW-I.80

675

BMW-I.81

676

BMW-I.82

677

BMW-I.83

678

BMW-I.84

679

BMW-I.85

680

BMW-I.86

681

BMW-I.87

682

BMW-I.88

683

BMW-I.89

684

BMW-I.90

685

BMW-I.91

686

BMW-I.92

687

BMW-I.93

688

BMW-I.94

689

BMW-I.95

690

BMW-I.96

691

BMW-I.97

692

BMW-I.98

693

BMW-I.99

694

BMW-I.100

695

BMW-I.101

696

BMW-I.102

697

BMW-I.103

698

BMW-I.104

699

BMW-I.105

700

BMW-I.106

701

BMW-I.107

702

BMW-I.108

703

BMW-I.109

704

BMW-I.110

705

BMW-I.111

706

BMW-I.112

707

BMW-I.113

708

BMW-I.114

709

BMW-I.115

710

BMW-I.116

711

BMW-I.117

712

BMW-I.118

713

BMW-I.119

714

BMW-I.120

715

BMW-I.121

716

BMW-I.122

717

BMW-I.123

718

BMW-I.124

719

BMW-I.125

720

BMW-I.126

721

BMW-I.127

722

BMW-I.128

723

BMW-I.129

724

BMW-I.130

725

BMW-I.131

726

BMW-I.132

727

BMW-I.133

728

BMW-I.134

729

BMW-I.135

730

BMW-I.136

731

BMW-I.137

732

BMW-I.138

733

BMW-I.139

734

BMW-I.140

735

BMW-I.141

736

BMW-I.142

737

BMW-I.143

738

BMW-I.144

739

BMW-I.145

740

BMW-I.146

741

BMW-I.147

742

BMW-I.148

743

BMW-I.149

744

BMW-I.150

745

BMW-I.151

746

BMW-I.152

747

BMW-I.153

748

BMW-I.154

749

BMW-I.155

750

BMW-I.156

751

BMW-I.157

752

BMW-I.158

753

BMW-I.159

754

BMW-I.160

755

BMW-I.161

756

BMW-I.162

757

BMW-I.163

758

BMW-I.164

759

BMW-I.165

760

BMW-I.166

761

BMW-I.167

762

BMW-I.168

763

BMW-I.169

764

BMW-I.170

765

BMW-I.171

766

BMW-I.172

767

BMW-I.173

768

BMW-I.174

769

BMW-I.175

770

BMW-I.176

771

BMW-I.177

772

BMW-I.178

773

BMW-I.179

774

BMW-I.180

775

BMW-I.181

776

BMW-I.182

777

BMW-I.183

778

BMW-I.184

779

BMW-I.185

780

BMW-I.186

781

BMW-I.187

782

BMW-I.188

783

BMW-I.189

784

BMW-I.190

785

BMW-I.191

786

BMW-I.192

787

BMW-I.193

788

BMW-I.194

789

BMW-I.195

790

BMW-I.196

791

BMW-I.197

792

BMW-I.198

793

BMW-I.199

794

BMW-I.200

795

BMW-I.201

796

BMW-I.202

797

BMW-I.203

798

BMW-I.204

799

BMW-I.205

800

BMW-I.206

801

BMW-I.207

802

BMW-I.208

803

BMW-I.209

804

BMW-I.210

805

BMW-I.211

806

BMW-I.212

807

BMW-I.213

808

BMW-I.214

809

BMW-I.215

810

BMW-I.216

811

BMW-I.217

812

BMW-I.218

813

BMW-I.219

814

BMW-I.220

815

BMW-I.221

816

BMW-I.222

817

BMW-I.223

818

BMW-I.224

819

BMW-I.225

820

BMW-I.226

821

BMW-I.227

822

BMW-I.228

823

BMW-I.229

824

BMW-I.230

825

BMW-I.231

826

BMW-I.232

827

BMW-I.233

828

BMW-I.234

829

BMW-I.235

830

BMW-I.236

831

BMW-I.237

832

BMW-I.238

833

BMW-I.239

834

BMW-I.240

835

BMW-I.241

836

BMW-I.242

837

BMW-I.243

838

BMW-I.244

839

BMW-I.245

840

BMW-I.246

841

BMW-I.247

842

BMW-I.248

843

BMW-I.249

844

BMW-I.250

845

BMW-I.251

846

BMW-I.252

847

BMW-I.253

848

BMW-I.254

849

BMW-I.255

850

BMW-I.256

851

BMW-I.257

852

BMW-I.258

853

BMW-I.259

854

BMW-I.260

855

BMW-I.261

856

BMW-I.262

857

BMW-I.263

858

BMW-I.264

859

BMW-I.265

860

BMW-I.266

861

BMW-I.267

862

BMW-I.268

863

BMW-I.269

864

BMW-I.270

865

BMW-I.271

866

BMW-I.272

867

BMW-I.273

868

BMW-I.274

869

BMW-I.275

870

BMW-I.276

871

BMW-I.277

872

BMW-I.278

873

BMW-I.279

874

BMW-I.280

875

BMW-I.281

876

BMW-I.282

877

BMW-I.283

878

BMW-I.284

879

BMW-I.285

880

BMW-I.286

881

BMW-I.287

882

BMW-I.288

883

BMW-I.289

884

BMW-I.290

885

BMW-I.291

886

BMW-I.292

887

BMW-I.293

888

BMW-I.294

889

BMW-I.295

890

BMW-I.296

891

BMW-I.297

892

BMW-I.298

893

BMW-I.299

894

BMW-I.300

895

BMW-I.301

896

BMW-I.302

897

BMW-I.303

898

BMW-I.304

899

BMW-I.305

900

BMW-I.306

901

BMW-I.307

902

BMW-I.308

903

BMW-I.309

904

BMW-I.310

905

BMW-I.311

906

BMW-I.312

907

BMW-I.313

908

BMW-I.314

909

BMW-I.315

910

BMW-I.316

911

BMW-I.317

912

BMW-I.318

913

BMW-I.319

914

BMW-I.320

915

BMW-I.321

916

BMW-I.322

917

BMW-I.323

918

BMW-I.324

919

BMW-I.325

920

BMW-I.326

921

BMW-I.327

922

BMW-I.328

923

BMW-I.329

924

BMW-I.330

925

BMW-I.331

926

BMW-I.332

927

BMW-I.333

928

BMW-I.334

929

BMW-I.335

930

BMW-I.336

931

BMW-I.337

932

BMW-I.338

933

BMW-I.339

934

BMW-I.340

935

BMW-I.341

936

BMW-I.342

937

BMW-I.343

938

BMW-I.344

939

BMW-I.345

940

BMW-I.346

941

BMW-I.347

942

BMW-I.348

943

BMW-I.349

944

BMW-I.350

945

BMW-I.351

946

BMW-I.352

947

BMW-I.353

948

BMW-I.354

949

BMW-I.355

950

BMW-I.356

951

BMW-I.357

952

BMW-I.358

953

BMW-I.359

954

BMW-I.360

955

BMW-I.361

956

BMW-I.362

957

BMW-I.363

958

BMW-I.364

959

BMW-I.365

960

BMW-I.366

961

BMW-I.367

962

BMW-I.368

963

BMW-I.369

964

BMW-I.370

965

BMW-I.371

966

BMW-I.372

967

BMW-I.373

968

BMW-I.374

969

BMW-I.375

970

BMW-I.376

971

BMW-I.377

972

BMW-I.378

973

BMW-I.379

974

BMW-I.380

975

BMW-I.381

976

BMW-I.382

977

BMW-I.383

978

BMW-I.384

979

BMW-I.385

980

BMW-I.386

981

BMW-I.387

982

BMW-I.388

983

BMW-I.389

984

BMW-I.390

985

BMW-I.391

986

BMW-I.392

987

BMW-I.393

988

BMW-I.394

989

BMW-I.395

990

BMW-I.396

991

BMW-I.397

992

BMW-I.398

993

BMW-I.399

994

BMW-I.400

995

BMW-I.401

996

BMW-I.402

997

BMW-I.403

998

BMW-I.404

999

BMW-I.405

1,000

BMW-I.406

1,001

BMW-I.407

1,002

BMW-I.408

1,003

BMW-I.409

1,004

BMW-I.410

1,005

BMW-I.411

1,006

BMW-I.412

1,007

BMW-I.413

1,008

BMW-I.414

1,009

BMW-I.415

1,010

BMW-I.416

NOTE
1
2

4
5
6

All the items to be used on work are of first quality & ISI and as approved by the Engineer In charge of the

Rates given above are:


a) Rate for finished item of work
b) Labour charges only
RATES
a) Supply Rates for all the materials are based on market rates plus Sales Tax/ Material VAT.
b) Works Contract VAT for General/ Composition Scheme on finished items may
LABOUR Labour
charges
Colouredare
porcelain items: 50% extra may be allowed on basic cost of white porcelain items excluding fittin
increased based on
SSR
Ratesand
for Sanitary & water supply items are purely for guidance for the officers for preparation of est
proposals
who
prepares
market rates the estimate is however responsible for proper rates as envisaged in Para 45 of APPWD co

LEGEND
"BMW" -X.XX
XXX-"A".XX
XXX-X."01"

ELECTRICAL ITEMS FOR BUILDINGS


SL. NO. ITEM CODE
1

1.1
ELEC-1.1.1

ELEC-1.1.2

ELEC-1.1.3

ELEC-1.1.4

ELEC-1.1.5

ELEC-1.1.6

ELEC-1.1.7

ELEC-1.1.8

ELEC-1.1.9

10

ELEC-1.1.10

11

ELEC-1.1.11

12

ELEC-1.1.12

13

ELEC-1.1.13

14

ELEC-1.1.14

15

ELEC-1.1.15

16

ELEC-1.1.16

17

ELEC-1.1.17

18

ELEC-1.1.18

19

ELEC-1.1.19

20

ELEC-1.1.20

21

ELEC-1.1.21

22

ELEC-1.1.22

23

ELEC-1.1.23

24

ELEC-1.1.24

25

ELEC-1.1.25

26

ELEC-1.1.26

27

ELEC-1.1.27

28

ELEC-1.1.28

29

ELEC-1.1.29

30

ELEC-1.1.30

31

ELEC-1.1.31

32

ELEC-1.1.32

33

ELEC-1.1.33

34

ELEC-1.1.34

35

ELEC-1.1.35

36

ELEC-1.1.36

37

ELEC-1.1.37

38

ELEC-1.1.38

39

ELEC-1.1.39

40

ELEC-1.1.40

41

ELEC-1.1.41

42

ELEC-1.1.42

43

ELEC-1.1.43

44

ELEC-1.1.44

45

ELEC-1.1.45

46

ELEC-1.1.46

47

ELEC-1.1.47

48

ELEC-1.1.48

49

ELEC-1.1.49

50

ELEC-1.1.50

51

ELEC-1.1.51

52

1.2
ELEC-1.2.1

53

ELEC-1.2.2

54

ELEC-1.2.3

55

ELEC-1.2.4

56

ELEC-1.2.5

57

ELEC-1.2.6

58

ELEC-1.2.7

59

ELEC-1.2.8

60

ELEC-1.2.9

61

ELEC-1.2.10

62

ELEC-1.2.11

63

ELEC-1.2.12

64

ELEC-1.2.13

65

ELEC-1.2.14

66

ELEC-1.2.15

67

ELEC-1.2.16

68

ELEC-1.2.17

69

ELEC-1.2.18

70

ELEC-1.2.19

71

ELEC-1.2.20

72

ELEC-1.2.21

73

ELEC-1.2.22

74

ELEC-1.2.23

75

ELEC-1.2.24

76

ELEC-1.2.25

77

ELEC-1.2.26

78

ELEC-1.2.27

79

ELEC-1.2.28

80

ELEC-1.2.29

81

ELEC-1.2.30

82

ELEC-1.2.31

83

ELEC-1.2.32

84

ELEC-1.2.33

85

ELEC-1.2.34

86

ELEC-1.2.35

87

ELEC-1.2.36

88

ELEC-1.2.37

89

ELEC-1.2.38

90

ELEC-1.2.39

91

ELEC-1.2.40

92

ELEC-1.2.41

93

ELEC-1.2.42

94

ELEC-1.2.43

95

ELEC-1.2.44

96

ELEC-1.2.45

97

ELEC-1.2.46

98

ELEC-1.2.47

99

ELEC-1.2.48

100

1.3
ELEC-1.3.1

101

ELEC-1.3.2

102

ELEC-1.3.3

103

ELEC-1.3.4

104

ELEC-1.3.5

105

ELEC-1.3.6

106

ELEC-1.3.7

107

ELEC-1.3.8

108

ELEC-1.3.9

109

ELEC-1.3.10

110

ELEC-1.3.11

111

ELEC-1.3.12
1.4

112

ELEC-1.4.1

113

ELEC-1.4.2

114

ELEC-1.4.3

115

ELEC-1.4.4

116

ELEC-1.4.5

117

ELEC-1.4.6

118

ELEC-1.4.7

119

ELEC-1.4.8

120

ELEC-1.4.9

121

ELEC-1.4.10

122

ELEC-1.4.11

123

ELEC-1.4.12

124

ELEC-1.4.13

125

ELEC-1.4.14

126

ELEC-1.4.15

127

ELEC-1.4.16

128

ELEC-1.4.17

129

ELEC-1.4.18

130

ELEC-1.4.19

131

ELEC-1.4.20

132

ELEC-1.4.21

133

ELEC-1.4.22

134

ELEC-1.4.23

135

ELEC-1.4.24

136

ELEC-1.4.25
1.5

137

ELEC-1.5.1

138

ELEC-1.5.2

139

ELEC-1.5.3

140

ELEC-1.5.4

141

ELEC-1.5.5

142

ELEC-1.5.6

143

ELEC-1.5.7

144

ELEC-1.5.8

145

ELEC-1.5.9

146

ELEC-1.5.10

147

ELEC-1.5.11

148

ELEC-1.5.12

149

ELEC-1.5.13

150

ELEC-1.5.14

151

ELEC-1.5.15

152

ELEC-1.5.16

153

ELEC-1.5.17

154

ELEC-1.5.18

155

ELEC-1.5.19

156

ELEC-1.5.20

157

ELEC-1.5.21

158

ELEC-1.5.22

159

ELEC-1.5.23

160

ELEC-1.5.24

161

ELEC-1.5.25

162

ELEC-1.5.26

163

ELEC-1.5.27

164

ELEC-1.5.28

165

ELEC-1.5.29

166

ELEC-1.5.30
1.6

167

ELEC-1.6.1

168

ELEC-1.6.2

169

ELEC-1.6.3

170

ELEC-1.6.4

171

ELEC-1.6.5

172

ELEC-1.6.6

173

ELEC-1.6.7

174

ELEC-1.6.8

175

ELEC-1.6.9

176

ELEC-1.6.10

177

ELEC-1.6.11

178

ELEC-1.6.12

179

ELEC-1.6.13

180

1.7
ELEC-1.7.1

181

ELEC-1.7.2

182

ELEC-1.7.3

183

ELEC-1.7.4

184

ELEC-1.7.5

185

ELEC-1.7.6

186

ELEC-1.7.7

187

ELEC-1.7.8

188

ELEC-1.7.9

189

ELEC-1.7.10

190

ELEC-1.7.11

191

ELEC-1.7.12

192

ELEC-1.7.13

193

ELEC-1.7.14

194

ELEC-1.7.15

195

ELEC-1.7.16

196

ELEC-1.7.17

197

ELEC-1.7.18

198

ELEC-1.7.19

199

ELEC-1.7.20

200

ELEC-1.7.21

201

ELEC-1.7.22

202

ELEC-1.7.23

203

ELEC-1.7.24

204

ELEC-1.7.25

205

ELEC-1.7.26

206

ELEC-1.7.27

207

ELEC-1.7.28

208

ELEC-1.7.29

209

ELEC-1.7.30

210

ELEC-1.7.31

211

ELEC-1.7.32

212

ELEC-1.7.33

213

ELEC-1.7.34

214

ELEC-1.7.35

215

ELEC-1.7.36

216

ELEC-1.7.37

217

ELEC-1.7.38

218

ELEC-1.7.39

219

ELEC-1.7.40

220

ELEC-1.7.41
1.8

221

ELEC-1.8.1

222

ELEC-1.8.2

223

ELEC-1.8.3

224

ELEC-1.8.4

225

ELEC-1.8.5

226

ELEC-1.8.6

227

ELEC-1.8.7

228

ELEC-1.8.8

229

ELEC-1.8.9

230

ELEC-1.8.10

231

ELEC-1.8.11

232

ELEC-1.8.12

233

ELEC-1.8.13

234

ELEC-1.8.14

235

ELEC-1.8.15

236

1.9
ELEC-1.9.1

237

ELEC-1.9.2

238

ELEC-1.9.3

239

ELEC-1.9.4

240

ELEC-1.9.5

241

ELEC-1.9.6

242

ELEC-1.9.7

243

ELEC-1.9.8

244

ELEC-1.9.9

245

ELEC-1.9.10

246

ELEC-1.9.11

247

ELEC-1.9.12

248

ELEC-1.9.13

249

ELEC-1.9.14

250

ELEC-1.9.15

251

ELEC-1.9.16

252

ELEC-1.9.17

253

ELEC-1.9.18

254

ELEC-1.9.19

255

ELEC-1.9.20

256

ELEC-1.9.21

257

ELEC-1.9.22

258

ELEC-1.9.23

259

ELEC-1.9.24

260

ELEC-1.9.25

261

ELEC-1.9.26

262

ELEC-1.9.27

263

ELEC-1.9.28

264

ELEC-1.9.29

265

ELEC-1.9.30

266

ELEC-1.9.31

267

ELEC-1.9.32

268

ELEC-1.9.33

269

ELEC-1.9.34

270

ELEC-1.9.35

271

ELEC-1.9.36

272

ELEC-1.9.37

273

ELEC-1.9.38

274

ELEC-1.9.39

275

ELEC-1.9.40

276

ELEC-1.9.41

277

ELEC-1.9.42

278

ELEC-1.9.43

279

ELEC-1.9.44

2.1
280

ELEC-2.1.1

281

ELEC-2.1.2

282

ELEC-2.1.3

283

ELEC-2.1.4

284

ELEC-2.1.5

285

ELEC-2.1.6

286

ELEC-2.1.7

287

ELEC-2.1.8

288

ELEC-2.1.9

289

ELEC-2.1.10

290

ELEC-2.1.11

291

ELEC-2.1.12

292

ELEC-2.1.13

293

ELEC-2.1.14

2.2

294

ELEC-2.2.1

295

ELEC-2.2.2

296

ELEC-2.2.3

297

ELEC-2.2.4

298

ELEC-2.2.5

299

ELEC-2.2.6

300

ELEC-2.2.7

301

ELEC-2.2.8

302

ELEC-2.2.9

303

ELEC-2.2.10

304

ELEC-2.2.11

305

ELEC-2.2.12

306

ELEC-2.2.13

307

2.3
ELEC-2.3.1

308

ELEC-2.3.2

309

ELEC-2.3.3

310

ELEC-2.3.4

311

ELEC-2.3.5

312

ELEC-2.3.6
2.4

313

ELEC-2.4.1

314

ELEC-2.4.2

315

ELEC-2.4.3

316

ELEC-2.4.4

317

ELEC-2.4.5

318

ELEC-2.4.6

319

ELEC-2.4.7

320

ELEC-2.4.8

321

ELEC-2.4.9

322

ELEC-2.4.10

323

ELEC-2.4.11

324

ELEC-2.4.12
2.5

325

ELEC-2.5.1

326

ELEC-2.5.2

327

ELEC-2.5.3

328

ELEC-2.5.4

329

ELEC-2.5.5

330

ELEC-2.5.6
2.6

331

ELEC-2.6.1

332

ELEC-2.6.2

333

ELEC-2.6.3

334

ELEC-2.6.4

335

ELEC-2.6.5

336

ELEC-2.6.6

337

2.7
ELEC-2.7.1

338

ELEC-2.7.2

339

ELEC-2.7.3

340

ELEC-2.7.4

341

2.8
ELEC-2.8.1

342

ELEC-2.8.2

343

ELEC-2.8.3

344

ELEC-2.8.4

345

ELEC-2.8.5

346

ELEC-2.8.6

347

ELEC-2.8.7

348

ELEC-2.8.8

349

ELEC-2.8.9

350

ELEC-2.8.10

351

ELEC-2.8.11

352

ELEC-2.8.12

353

ELEC-2.8.13

354

ELEC-2.8.14

355

ELEC-2.8.15

356

ELEC-2.8.16

357

ELEC-2.8.17

358

ELEC-2.8.18

359

ELEC-2.8.19

360

ELEC-2.8.20

361

ELEC-2.8.21

362

ELEC-2.8.22

363

ELEC-2.8.23

364

ELEC-2.8.24

365

ELEC-2.8.25

366

ELEC-2.8.26

367

ELEC-2.8.27

368

ELEC-2.8.28

369

ELEC-2.8.29

370

ELEC-2.8.30

371

ELEC-2.8.31

372

ELEC-2.8.32

373

ELEC-2.8.33

374

ELEC-2.8.34

375

ELEC-2.8.35

376

ELEC-2.8.36

377

ELEC-2.8.37

378

ELEC-2.8.38

379

ELEC-2.8.39

380

ELEC-2.8.40

381

ELEC-2.8.40

382

2.9
ELEC-2.9.1

383

ELEC-2.9.2

384

ELEC-2.9.3

385

ELEC-2.9.4

386

ELEC-2.9.5

387

ELEC-2.9.6

388

ELEC-2.9.7

389

ELEC-2.9.8

390

ELEC-2.9.9

391

ELEC-2.9.10

392

ELEC-2.9.11

393

ELEC-2.9.12

394

ELEC-2.9.13

395

ELEC-2.9.14

396

ELEC-2.9.15

397

ELEC-2.9.16

398

ELEC-2.9.17

399

ELEC-2.9.18

400

ELEC-2.9.19

401

ELEC-2.9.20

402

ELEC-2.9.21

403

ELEC-2.9.22

404

ELEC-2.9.23

405

ELEC-2.9.24

406

2.10
ELEC-2.10.1

407

ELEC-2.10.2

408

ELEC-2.10.3

409

ELEC-2.10.4

410

ELEC-2.10.5

411

ELEC-2.10.6

412

ELEC-2.10.7

413

ELEC-2.10.8

414

ELEC-2.10.9

415

ELEC-2.10.10

416

ELEC-2.10.11

417

ELEC-2.10.12

418

ELEC-2.10.13

419

ELEC-2.10.14

420

ELEC-2.10.15

421

ELEC-2.10.16

422

ELEC-2.10.17

423

ELEC-2.10.18

424

ELEC-2.10.19

425

ELEC-2.10.20

426

ELEC-2.10.21

427

ELEC-2.10.22

2.11
428

ELEC-2.11.1

429

ELEC-2.11.2

430

ELEC-2.11.3

431

ELEC-2.11.4

432

ELEC-2.11.5

433

ELEC-2.11.6

434

ELEC-2.11.7

435

ELEC-2.11.8

436

ELEC-2.11.9

437

ELEC-2.11.10

438

ELEC-2.11.11

439

ELEC-2.11.12

440

ELEC-2.11.13

441

ELEC-2.11.14

442

ELEC-2.11.15

443

ELEC-2.11.16

444

ELEC-2.11.17

2.12
445

ELEC-2.12.1

446

ELEC-2.12.2

447

ELEC-2.12.3

448

ELEC-2.12.4

449

ELEC-2.12.5

450

ELEC-2.12.6

451

ELEC-2.12.7

452

ELEC-2.12.8

453

ELEC-2.12.9

454

ELEC-2.12.10

455

ELEC-2.12.11

456

ELEC-2.12.12

457

ELEC-2.12.13

458

ELEC-2.12.14

459

ELEC-2.12.15

460

ELEC-2.12.16

461

ELEC-2.12.17

462

ELEC-2.12.18

463

ELEC-2.12.19

464

ELEC-2.12.20

465

ELEC-2.12.21

466

ELEC-2.12.22

467

ELEC-2.12.23

468

ELEC-2.12.24

469

ELEC-2.12.25

470

ELEC-2.12.26

471

ELEC-2.12.27

472

ELEC-2.12.28

473

ELEC-2.12.29

474

ELEC-2.12.30

475

ELEC-2.12.31

476

ELEC-2.12.32

477

ELEC-2.12.33

478

ELEC-2.12.34

479

ELEC-2.12.35

480

ELEC-2.12.36

481

ELEC-2.12.37

482

ELEC-2.12.38

483

ELEC-2.12.39

484

ELEC-2.12.40

485

ELEC-2.12.41

486

ELEC-2.12.42

487

ELEC-2.12.43

488

ELEC-2.12.44

489

ELEC-2.12.45

490

ELEC-2.12.46

491

ELEC-2.12.47

492

ELEC-2.12.48

493

ELEC-2.12.49

493

ELEC-2.12.50

494

ELEC-2.12.51

495

ELEC-2.12.52

496

ELEC-2.12.53

497

ELEC-2.12.54

498

ELEC-2.12.55

499

ELEC-2.12.56

500

ELEC-2.12.57

501

ELEC-2.12.58

502

ELEC-2.12.59

503

ELEC-2.12.60

504

ELEC-2.12.61

505

ELEC-2.12.62

506

ELEC-2.12.63

507

ELEC-2.12.64

508

ELEC-2.12.65

509

ELEC-2.12.66

510

ELEC-2.12.67

511

ELEC-2.12.68

512

ELEC-2.12.69

513

ELEC-2.12.70

514

ELEC-2.12.71

515

3.1
ELEC-3.1.1

516

ELEC-3.1.2

517

ELEC-3.1.3

518

ELEC-3.1.4

519

ELEC-3.1.5

520

ELEC-3.1.6

521

ELEC-3.1.13

522

ELEC-3.1.8

523

ELEC-3.1.9

524

ELEC-3.1.10

525

ELEC-3.1.11

526

ELEC-3.1.12

527

ELEC-3.1.13

528

ELEC-3.1.14

529

ELEC-3.1.15

530

ELEC-3.1.16

531

ELEC-3.1.17

532

ELEC-3.1.18

533

ELEC-3.1.19

534

ELEC-3.1.20

535

ELEC-3.1.21

536

ELEC-3.1.22

537

ELEC-3.1.23

538

ELEC-3.1.24

539

ELEC-3.1.25

540

ELEC-3.1.26

541

ELEC-3.1.27

542

ELEC-3.1.28

543

ELEC-3.1.29

544

ELEC-3.1.30

545

ELEC-3.1.31

546

ELEC-3.1.32

547

ELEC-3.1.33

548

ELEC-3.1.34

549

ELEC-3.1.35

550

ELEC-3.1.36

551

ELEC-3.1.37

552

3.2
ELEC-3.2.1

553

ELEC-3.2.3

554

3.3
ELEC-3.3.1

555

ELEC-3.3.2

556

ELEC-3.3.3

557

ELEC-3.3.4

558

ELEC-3.3.5

559

ELEC-3.3.6

560

ELEC-3.3.7

561

ELEC-3.3.8

562

ELEC-3.3.9

563

ELEC-3.3.10

564

ELEC-3.3.11

565

ELEC-3.3.12

566

ELEC-3.3.13

567

ELEC-3.3.14

568

ELEC-3.3.15

569

ELEC-3.3.16

570

ELEC-3.3.17

571

ELEC-3.3.18

572

ELEC-3.3.19

573

ELEC-3.3.20

574

ELEC-3.3.21

575

ELEC-3.3.22

576

ELEC-3.3.23

576

ELEC-3.3.24

577

ELEC-3.3.25

578

ELEC-3.3.26

579

ELEC-3.3.27

580

ELEC-3.3.28

581

ELEC-3.3.29

582

ELEC-3.3.30

583

ELEC-3.3.31

584

ELEC-3.3.32

585

ELEC-3.3.33

586

3.4
ELEC-3.4.1

587

ELEC-3.4.2

588

ELEC-3.4.3

589

ELEC-3.4.4

590

ELEC-3.4.5

591

ELEC-3.4.6

592

ELEC-3.4.7

593

ELEC-3.4.8

594

ELEC-3.4.9

595

ELEC-3.4.10

596

ELEC-3.4.11

597

ELEC-3.4.12

598

ELEC-3.4.13

599

ELEC-3.4.14

600

ELEC-3.4.15

601

ELEC-3.4.16

602

ELEC-3.4.17

603

ELEC-3.4.18

604

ELEC-3.4.19

605

ELEC-3.4.20

606

ELEC-3.4.21

607

ELEC-3.4.22

608

ELEC-3.4.23

609

ELEC-3.4.24

610

ELEC-3.4.25

611

ELEC-3.4.26

612

ELEC-3.4.27

613

ELEC-3.4.28

614

ELEC-3.4.29

615

ELEC-3.4.30

616

ELEC-3.4.31

617

ELEC-3.4.32

618

ELEC-3.4.33

619

ELEC-3.4.34

620

ELEC-3.4.35

621

ELEC-3.4.36

622

ELEC-3.4.37

623

ELEC-3.4.38

624

ELEC-3.4.39

625

ELEC-3.4.40

626

ELEC-3.4.41

627

ELEC-3.4.42

628

ELEC-3.4.43

629

ELEC-3.4.44

630

ELEC-3.4.45

631

ELEC-3.4.46

632

ELEC-3.4.47

633

3.5
ELEC-3.5.1

634

ELEC-3.5.2

635

ELEC-3.5.3

636

ELEC-3.5.4

637

ELEC-3.5.5

638

ELEC-3.5.6

3.6
ELEC-3.6.1

ELEC-3.6.2

ELEC-3.6.3

ELEC-3.6.4

ELEC-3.6.5

ELEC-3.6.6

ELEC-3.6.7

ELEC-3.6.8

ELEC-3.6.9

10

ELEC-3.6.10

11

ELEC-3.6.11

12

ELEC-3.6.12

13

ELEC-3.6.13

14

ELEC-3.6.14

15

ELEC-3.6.15

16

ELEC-3.6.16

17

ELEC-3.6.17

18

ELEC-3.6.18

19

ELEC-3.6.19

20

ELEC-3.6.20

21

ELEC-3.6.21

22

ELEC-3.6.22

23

ELEC-3.6.23

24

ELEC-3.6.24

25

ELEC-3.6.25

26

ELEC-3.6.26

27

ELEC-3.6.27

28

ELEC-3.6.28

29

ELEC-3.6.29

30

ELEC-3.6.30

31

ELEC-3.6.31

32

ELEC-3.6.32

33

ELEC-3.6.33

34

ELEC-3.6.34

35

ELEC-3.6.35

36

ELEC-3.6.36

37

ELEC-3.6.37

38

ELEC-3.6.38

39

ELEC-3.6.39

40

ELEC-3.6.40

41

ELEC-3.6.41

42

ELEC-3.6.42

43

ELEC-3.6.43

44

ELEC-3.6.44

45

ELEC-3.6.45

46

ELEC-3.6.46

47

ELEC-3.6.47

48

ELEC-3.6.48

49

ELEC-3.6.49

50

ELEC-3.6.50

51

ELEC-3.6.51

52

ELEC-3.6.52

53

ELEC-3.6.53

54

ELEC-3.6.54

55

ELEC-3.6.55

56

ELEC-3.6.56

57

ELEC-3.6.57

58

ELEC-3.6.58

59

ELEC-3.6.59

60

ELEC-3.6.60

61

ELEC-3.6.61

62

ELEC-3.6.62

63

ELEC-3.6.63

64

ELEC-3.6.64

65

ELEC-3.6.65

66

ELEC-3.6.66

67

ELEC-3.6.67

68

3.7
ELEC-3.7.1

69

ELEC-3.7.2

70

ELEC-3.7.3

71

ELEC-3.7.4

72

ELEC-3.7.5

73

ELEC-3.7.6

74

ELEC-3.7.7

75

ELEC-3.7.8

76

ELEC-3.7.9

77

ELEC-3.7.10

78

ELEC-3.7.11

79

ELEC-3.7.12

80

ELEC-3.7.13

81

ELEC-3.7.14

82

ELEC-3.7.15

83

ELEC-3.7.16

84

ELEC-3.7.17

85

ELEC-3.7.18

86

ELEC-3.7.19

87

ELEC-3.7.20

88

ELEC-3.7.21

89

ELEC-3.7.22

90

ELEC-3.7.23

91

ELEC-3.7.24

92

ELEC-3.7.25

93

ELEC-3.7.26

94

ELEC-3.7.27

95

ELEC-3.7.28

96

ELEC-3.7.29

97

ELEC-3.7.30

98

ELEC-3.7.31

99

ELEC-3.7.32

100

ELEC-3.7.33

101

ELEC-3.7.34

102

ELEC-3.7.35

103

ELEC-3.7.36

104

ELEC-3.7.37

105

ELEC-3.7.38

106

ELEC-3.7.39

107

ELEC-3.7.40

108

ELEC-3.7.41

109

ELEC-3.7.42

110

ELEC-3.7.43

111

ELEC-3.7.44

112

ELEC-3.7.45

113

ELEC-3.7.46

114

ELEC-3.7.47

115

ELEC-3.7.48

116

ELEC-3.7.49

117

ELEC-3.7.50

118

ELEC-3.7.51

119

ELEC-3.7.52

120

ELEC-3.7.53

121

ELEC-3.7.54

122

ELEC-3.7.55

123

ELEC-3.7.56

124

ELEC-3.7.57

125

ELEC-3.7.58

126

ELEC-3.7.59

127

ELEC-3.7.60

128

ELEC-3.7.61

129

ELEC-3.7.62

130

ELEC-3.7.63

3.8
ELEC-3.8.1

ELEC-3.8.2

ELEC-3.8.3

ELEC-3.8.4

#REF!

3.9
ELEC-3.9.1

#REF!

ELEC-3.9.2

#REF!

ELEC-3.9.3

#REF!

ELEC-3.9.4

#REF!

ELEC-3.9.5

#REF!

ELEC-3.9.6

#REF!

ELEC-3.9.7

#REF!

ELEC-3.9.8

#REF!

ELEC-3.9.9

#REF!

ELEC-3.9.10

#REF!

ELEC-3.9.11

#REF!

ELEC-3.9.12

#REF!

ELEC-3.9.13

#REF!

ELEC-3.9.14

#REF!

ELEC-3.9.15

#REF!

ELEC-3.9.16

#REF!

ELEC-3.9.17

#REF!

ELEC-3.9.18

#REF!

ELEC-3.9.19

#REF!

#REF!

ELEC-3.9.20

#REF!

ELEC-3.9.21

#REF!

ELEC-3.9.22

#REF!

ELEC-3.9.23

#REF!

ELEC-3.9.24

#REF!

ELEC-3.9.25

#REF!

ELEC-3.9.26

#REF!

ELEC-3.9.27

#REF!

ELEC-3.9.28

ELEC-3.9.29
ELEC-3.9.30
ELEC-3.9.31
ELEC-3.9.32
3.1
#REF!

ELEC-3.10.1
ELEC-3.10.2
ELEC-3.10.3
ELEC-3.10.4
ELEC-3.10.5
#REF!

ELEC-3.10.6
ELEC-3.10.7
ELEC-3.10.8

ELEC-3.10.9
ELEC-3.10.10

#REF!

ELEC-3.10.11
ELEC-3.10.12
ELEC-3.10.13
ELEC-3.10.14

#REF!

ELEC-3.10.15
ELEC-3.10.16

ELEC-3.10.17
ELEC-3.10.18
ELEC-3.10.19
#REF!

ELEC-3.10.20
ELEC-3.10.21
ELEC-3.10.22

ELEC-3.10.23
ELEC-3.10.24
ELEC-3.10.25
#REF!

ELEC-3.10.26
ELEC-3.10.27

ELEC-3.10.28

4.1
ELEC-4.1.1

ELEC-4.1.2

ELEC-4.1.3

ELEC-4.1.4

ELEC-4.1.5

ELEC-4.1.6

ELEC-4.1.7

ELEC-4.1.8

ELEC-4.1.9

10

ELEC-4.1.10

11

ELEC-4.1.11

12

ELEC-4.1.12

13

ELEC-4.1.13

14

ELEC-4.1.14

15

ELEC-4.1.15

16

ELEC-4.1.16

17

ELEC-4.1.17

18

ELEC-4.1.18

19

ELEC-4.1.19

20

ELEC-4.1.20

21

ELEC-4.1.21

22

ELEC-4.1.22

23

ELEC-4.1.23

24

ELEC-4.1.24

25

ELEC-4.1.25

26

ELEC-4.1.26

27

ELEC-4.1.27

28

ELEC-4.1.28

29

ELEC-4.1.29

30

ELEC-4.1.30

31

ELEC-4.1.31

32

ELEC-4.1.32

33

ELEC-4.1.33

34

ELEC-4.1.34

35

ELEC-4.1.35

36

ELEC-4.1.36

37

ELEC-4.1.37

38

ELEC-4.1.38

39

ELEC-4.1.39

40

ELEC-4.1.40

41

ELEC-4.1.41

42

ELEC-4.1.42

43

ELEC-4.1.43

44

ELEC-4.1.44

45

ELEC-4.1.45

46

ELEC-4.1.46

47

ELEC-4.1.47

48
49

ELEC-4.1.48

50

ELEC-4.1.49

51

ELEC-4.1.50

52

ELEC-4.1.51

53

ELEC-4.1.52

54

ELEC-4.1.53

55

ELEC-4.1.54

56
57

4.2
ELEC-4.2.1

58

ELEC-4.2.2

59

ELEC-4.2.3

60

ELEC-4.2.4

61

ELEC-4.2.5

62

ELEC-4.2.6

63

ELEC-4.2.7

64

4.3

65

ELEC-4.3.1

66

ELEC-4.3.2

67

ELEC-4.3.3

68

ELEC-4.3.4

69

ELEC-4.3.5

70

ELEC-4.3.6

71

ELEC-4.3.7

72

ELEC-4.3.8

73

ELEC-4.3.9

74

ELEC-4.3.10

75

ELEC-4.3.11

76

ELEC-4.3.12

77

ELEC-4.3.13

78

ELEC-4.3.14

79

ELEC-4.3.15

80

ELEC-4.3.16

81

ELEC-4.3.17

82

ELEC-4.3.18

83

ELEC-4.3.19

84

ELEC-4.3.20

85

ELEC-4.3.21

86

ELEC-4.3.22

87

ELEC-4.3.23

88

ELEC-4.3.24

89

4.4

90
91

ELEC-4.4.1

92

ELEC-4.4.2

93

ELEC-4.4.3

94

ELEC-4.4.4

95

ELEC-4.4.5

96
97

ELEC-4.4.6

98

ELEC-4.4.7

99

ELEC-4.4.8

100
101

ELEC-4.4.9

102

ELEC-4.4.10

103

ELEC-4.4.11

104

ELEC-4.4.12

105

ELEC-4.4.13

106

ELEC-4.4.14

107

4.5

108

ELEC-4.5.1

109

ELEC-4.5.2

110

ELEC-4.5.3

111

ELEC-4.5.4

112

ELEC-4.5.5

113

ELEC-4.5.6

114

ELEC-4.5.7

115

ELEC-4.5.8

116

4.6

117

ELEC-4.6.1

118

ELEC-4.6.2

119

ELEC-4.6.3

120

ELEC-4.6.4

121

ELEC-4.6.5

122

ELEC-4.6.6

123

ELEC-4.6.7

124

ELEC-4.6.8

125
126

127
128

5.1
ELEC-5.1.1

129

ELEC-5.1.2

130

ELEC-5.1.3

131

ELEC-5.1.4

132

ELEC-5.1.5

133

ELEC-5.1.6

134

ELEC-5.1.7

135

ELEC-5.1.8

136

ELEC-5.1.9

137

ELEC-5.1.10

138

ELEC-5.1.11

139

ELEC-5.1.12

140

ELEC-5.1.13

141

ELEC-5.1.14

142

ELEC-5.1.15

143

5.2

144

ELEC-5.2.1

145

ELEC-5.2.2

146

5.3

147

ELEC-5.3.1

148

ELEC-5.3.2

149

ELEC-5.3.3

150

ELEC-5.3.4

151

5.4

152

ELEC-5.4.1

153

ELEC-5.4.2

154

ELEC-5.4.3

155

ELEC-5.4.4

156
157

ELEC-5.4.5

158

ELEC-5.4.6

159

ELEC-5.4.7

160

ELEC-5.4.8

161

ELEC-5.4.9

162

ELEC-5.4.10

163

ELEC-5.4.11

164

ELEC-5.4.12

165

ELEC-5.4.13

166

ELEC-5.4.14

167
168

ELEC-5.4.15

169

ELEC-5.4.16

170

ELEC-5.4.17

171

ELEC-5.4.18

172

ELEC-5.4.19

173

ELEC-5.4.20

174

ELEC-5.4.21

175

ELEC-5.4.22

176

ELEC-5.4.23

177

ELEC-5.4.24

178
179

ELEC-5.4.25

180

ELEC-5.4.26

181

ELEC-5.4.27

182

ELEC-5.4.28

183

ELEC-5.4.29

184

ELEC-5.4.30

185
186

ELEC-5.4.31

187

ELEC-5.4.32

188

ELEC-5.4.33

189

ELEC-5.4.34

190

ELEC-5.4.35

191

ELEC-5.4.36

192

ELEC-5.4.37

193

ELEC-5.4.38

194
195

ELEC-5.4.39

196

ELEC-5.4.40

197

ELEC-5.4.41

198

ELEC-5.4.42

199

ELEC-5.4.43

200

ELEC-5.4.44

201

ELEC-5.4.45

202

ELEC-5.4.46

203

ELEC-5.4.47

204

ELEC-5.4.48

205

ELEC-5.4.49

206

ELEC-5.4.50

207

ELEC-5.4.51

208

ELEC-5.4.52

209

210

ELEC-5.4.32

211

5.5

212

ELEC-5.5.1

213

ELEC-5.5.2

214

ELEC-5.5.3

215

ELEC-5.5.4

216

ELEC-5.5.5

217

ELEC-5.5.6

218

ELEC-5.5.7

219

ELEC-5.5.8

220

ELEC-5.5.9

221

ELEC-5.5.10

222

ELEC-5.5.11

223

ELEC-5.5.12

224

ELEC-5.5.13

225

ELEC-5.5.14

226

ELEC-5.5.15

227

ELEC-5.5.16

228

ELEC-5.5.17

229

ELEC-5.5.18

230

ELEC-5.5.19

231

ELEC-5.5.20

232

ELEC-5.5.21

233

ELEC-5.5.22

234

ELEC-5.5.23

235

ELEC-5.5.24

236

ELEC-5.5.25

237

ELEC-5.5.26

238

ELEC-5.5.27

239

ELEC-5.5.28

240

ELEC-5.5.29

241

ELEC-5.5.30

242

ELEC-5.5.31

243

ELEC-5.5.32

244

ELEC-5.5.33

245

ELEC-5.5.34

246
247
248

249

ELEC-5.5.35

250

ELEC-5.5.36

251

ELEC-5.5.37

252

ELEC-5.5.38

253

254

ELEC-5.5.39

255

ELEC-5.5.40

256

ELEC-5.5.41

257

ELEC-5.5.42

258

259

ELEC-5.5.100

260

ELEC-5.5.43

261

ELEC-5.5.44

262

ELEC-5.5.45

263

ELEC-5.5.46

264
265
266

ELEC-5.5.47

267

ELEC-5.5.48

268

ELEC-5.5.49

269

ELEC-5.5.50

270

ELEC-5.5.51

271

ELEC-5.5.52

272

ELEC-5.5.53

273

ELEC-5.5.54

274

ELEC-5.5.55

275

ELEC-5.5.56

276

ELEC-5.5.57

277

ELEC-5.5.58

278
279
280

ELEC-5.5.59

281

ELEC-5.5.60

282
283
284

ELEC-5.5.61

285

ELEC-5.5.62

286
287

ELEC-5.5.63

288

ELEC-5.5.64

289

ELEC-5.5.65

290

ELEC-5.5.66

291

ELEC-5.5.67

292

ELEC-5.5.68

293

ELEC-5.5.69

294

ELEC-5.5.70

295

ELEC-5.5.71

296

ELEC-5.5.72

297

5.6

298

ELEC-5.6.1

299

ELEC-5.6.2

300

ELEC-5.6.3

301

ELEC-5.6.4

302

ELEC-5.6.5

303

ELEC-5.6.6

304

ELEC-5.6.7

305

ELEC-5.6.8

306

ELEC-5.6.9

307

6.1

308

ELEC-6.1.1

309

ELEC-6.1.2

310

ELEC-6.1.3

311

ELEC-6.1.4

312

ELEC-6.1.5

313

ELEC-6.1.6

314

ELEC-6.1.7

315

ELEC-6.1.8

316

ELEC-6.1.9

317

ELEC-6.1.10

318

ELEC-6.1.11

319

ELEC-6.1.12

320

ELEC-6.1.13

321

ELEC-6.1.14

322

ELEC-6.1.15

323

ELEC-6.1.16

324

ELEC-6.1.17

325

ELEC-6.1.18

326

ELEC-6.1.19

327

ELEC-6.1.20

328

ELEC-6.1.21

329

ELEC-6.1.22

330

ELEC-6.1.23

331

ELEC-6.1.24

332

ELEC-6.1.25

333

ELEC-6.1.26

334

ELEC-6.1.27

335

ELEC-6.1.28

336

ELEC-6.1.29

337

ELEC-6.1.30

338

ELEC-6.1.31

339

ELEC-6.1.32

340

ELEC-6.1.33

341

ELEC-6.1.34

342

ELEC-6.1.35

343

ELEC-6.1.36

344

ELEC-6.1.37

345

ELEC-6.1.38

346
347
348

ELEC-6.1.39
ELEC-6.1.40

349
350
351

ELEC-6.1.41
ELEC-6.1.42
ELEC-6.1.43

352

353

ELEC-6.1.44

354

ELEC-6.1.45

355

ELEC-6.1.46

356

ELEC-6.1.47

357

ELEC-6.1.48

358

359

ELEC-6.1.49

360

ELEC-6.1.50

361
362
363

ELEC-6.1.51
ELEC-6.1.52
ELEC-6.1.53

364

6.2

365

ELEC-6.2.1

366

ELEC-6.2.2

367

ELEC-6.2.3

368

6.3

369

ELEC-6.3.1

370

ELEC-6.3.2

371

ELEC-6.3.3

372

ELEC-6.3.4

373

ELEC-6.3.5

374

ELEC-6.3.6

375

ELEC-6.3.7

376

ELEC-6.3.8

377

ELEC-6.3.9

378

ELEC-6.3.10

379

ELEC-6.3.11

380

ELEC-6.3.12

381

ELEC-6.3.13

382

ELEC-6.3.14

383

6.4

384

ELEC-6.4.1

385

ELEC-6.4.2

386

ELEC-6.4.3

387

ELEC-6.4.4

388

ELEC-6.4.5

389

ELEC-6.4.6

390

ELEC-6.4.7

391

ELEC-6.4.8

392

ELEC-6.4.9

393

ELEC-6.4.10

394

ELEC-6.4.11

395

ELEC-6.4.12

396

ELEC-6.4.13

397

ELEC-6.4.14

398

ELEC-6.4.15

399

ELEC-6.4.16

400

ELEC-6.4.17

401

ELEC-6.4.18

402

ELEC-6.4.19

403

ELEC-6.4.20

404

ELEC-6.4.21

405

ELEC-6.4.22

406

ELEC-6.4.23

407

ELEC-6.4.24

408

ELEC-6.4.25

409

ELEC-6.4.26

410

ELEC-6.4.27

411

ELEC-6.4.28

412

ELEC-6.4.29

413

ELEC-6.4.30

414

ELEC-6.4.31

415

ELEC-6.4.32

416

ELEC-6.4.33

417

418
419

420

421

422
423
424
425
426
427

ELEC-6.4.34
ELEC-6.4.35
ELEC-6.4.36
ELEC-6.4.37
ELEC-6.4.38
ELEC-6.4.39

428

429

430

431

432

433
434
435
436
437
438

ELEC-6.4.40
ELEC-6.4.41
ELEC-6.4.42
ELEC-6.4.43
6.5
ELEC-6.5.1

439

ELEC-6.5.2

440

ELEC-6.5.3

441

ELEC-6.5.4

442

ELEC-6.5.5

443

ELEC-6.5.6

444

ELEC-6.5.7

445

ELEC-6.5.8

446

ELEC-6.5.9

447

ELEC-6.5.10

448

ELEC-6.5.11

449

ELEC-6.5.12

450

ELEC-6.5.13

451

ELEC-6.5.14

452

ELEC-6.5.15

453

ELEC-6.5.16

454

ELEC-6.5.17

455

ELEC-6.5.18

456

ELEC-6.5.19

457

ELEC-6.5.20

458

7.1

459

ELEC-7.1.1

460

ELEC-7.1.2

461

ELEC-7.1.3

462

ELEC-7.1.4

463

ELEC-7.1.5

464

ELEC-7.1.6

465
466

ELEC-7.1.7
ELEC-7.1.8

467

ELEC-7.1.9

468

ELEC-7.1.10

469

ELEC-7.1.11

470

ELEC-7.1.12

471

ELEC-7.1.13

472

ELEC-7.1.14

473

ELEC-7.1.15

474

ELEC-7.1.16

475

ELEC-7.1.17

476

ELEC-7.1.18

477

ELEC-7.1.19

478

ELEC-7.1.20

479

ELEC-7.1.21

480

ELEC-7.1.22

481

ELEC-7.1.23

482

ELEC-7.1.24

483

ELEC-7.1.25

484

ELEC-7.1.26

485

ELEC-7.1.27

486

ELEC-7.1.28

487

ELEC-7.1.29

488

ELEC-7.1.30

489

ELEC-7.1.31

490

ELEC-7.1.32

491
492

ELEC-7.1.33

493

ELEC-7.1.34

494

ELEC-7.1.35

495

ELEC-7.1.36

496

ELEC-7.1.37

497

ELEC-7.1.38

498

ELEC-7.1.39

499

ELEC-7.1.40

500

ELEC-7.1.41

501

8.1

502

ELEC-8.1.1

503

ELEC-8.1.2

504

ELEC-8.1.3

505

ELEC-8.1.4

506

ELEC-8.1.5

507

ELEC-8.1.6

508

ELEC-8.1.7

509

ELEC-8.1.8

510

ELEC-8.1.9

511

ELEC-8.1.10

512

ELEC-8.1.11

513

ELEC-8.1.12

514

ELEC-8.1.13

515

ELEC-8.1.14

516

ELEC-8.1.15

517

ELEC-8.1.16

518

ELEC-8.1.17

519

ELEC-8.1.18

520

ELEC-8.1.19

521

ELEC-8.1.20

522

ELEC-8.1.21

523

ELEC-8.1.22

524

ELEC-8.1.23

525

ELEC-8.1.24

526

ELEC-8.1.25

527

ELEC-8.1.26

528

ELEC-8.1.27

529

ELEC-8.1.28

530

ELEC-8.1.29

531

ELEC-8.1.30

532

ELEC-8.1.31

533

ELEC-8.1.32

534

ELEC-8.1.33

535

ELEC-8.1.34

536

ELEC-8.1.35

537

ELEC-8.1.36

538

ELEC-8.1.37

539

ELEC-8.1.38

540

ELEC-8.1.39

541

ELEC-8.1.40

542

ELEC-8.1.41

543

ELEC-8.1.42

544

ELEC-8.1.43

545

ELEC-8.1.44

546

ELEC-8.1.45

547

ELEC-8.1.46

548

ELEC-8.1.47

549

ELEC-8.1.48

550

ELEC-8.1.49

551

ELEC-8.1.50

552

ELEC-8.1.51

553

ELEC-8.1.52

554

ELEC-8.1.53

555

ELEC-8.1.54

556

ELEC-8.1.55

557

ELEC-8.1.56

558

ELEC-8.1.57

559

ELEC-8.1.58

560

ELEC-8.1.59

561

ELEC-8.1.60

562

ELEC-8.1.61

563

ELEC-8.1.62

564

ELEC-8.1.63

565

ELEC-8.1.64

566

ELEC-8.1.65

567

ELEC-8.1.66

568

ELEC-8.1.67

569

ELEC-8.1.68

570

ELEC-8.1.69

571

ELEC-8.1.70

572

ELEC-8.1.71

573

ELEC-8.1.72

574

ELEC-8.1.73

575
576

ELEC-8.1.74

577

ELEC-8.1.75

578

ELEC-8.1.76

579

ELEC-8.1.77

580

ELEC-8.1.78

581

ELEC-8.1.79

582

ELEC-8.1.80

583

ELEC-8.1.81

584

ELEC-8.1.88

585

ELEC-8.1.83

586

ELEC-8.1.84

587

ELEC-8.1.85

588

ELEC-8.1.86

589

ELEC-8.1.87

590

ELEC-8.1.88

591

ELEC-8.1.89

592

ELEC-8.1.90

593

ELEC-8.1.91

594

ELEC-8.1.92

595

ELEC-8.1.93

596

9.1

597

ELEC-9.1.1

598

ELEC-9.1.2

599

ELEC-9.1.3

600

ELEC-9.1.4

601

9.2

602

ELEC-9.2.1

603

ELEC-9.2.2

604

ELEC-9.2.3

605

ELEC-9.2.4

606

ELEC-9.2.5

607

ELEC-9.2.6

608

ELEC-9.2.7

609

ELEC-9.2.8

610

ELEC-9.2.9

611

ELEC-9.2.10

612

ELEC-9.2.11

613

ELEC-9.2.12

614

ELEC-9.2.13

615

ELEC-9.2.14

616

ELEC-9.2.15

617

ELEC-9.2.16

618

ELEC-9.2.17

619

ELEC-9.2.18

620

ELEC-9.2.19

621

ELEC-9.2.20

622

ELEC-9.2.21

623

ELEC-9.2.22

624

ELEC-9.2.23

625

ELEC-9.2.24

626

ELEC-9.2.25

627

ELEC-9.2.26

628

ELEC-9.2.27

629

ELEC-9.2.28

630

ELEC-9.2.29

631

ELEC-9.2.30

632

9.3

633

ELEC-9.3.1

634

ELEC-9.3.2

635

ELEC-9.3.3

636

ELEC-9.3.4

637

ELEC-9.3.5

638

ELEC-9.3.6

639

ELEC-9.3.7

640

ELEC-9.3.8

641

ELEC-9.3.9

642

ELEC-9.3.10

643

ELEC-9.3.11

644

ELEC-9.3.12

645

ELEC-9.3.13

646

ELEC-9.3.14

647

9.4

648

ELEC-9.4.1

649

ELEC-9.4.2

650

ELEC-9.4.3

651

ELEC-9.4.4

652

ELEC-9.4.5

653

ELEC-9.4.6

654

ELEC-9.4.7

655

ELEC-9.4.8

656

ELEC-9.4.9

657

ELEC-9.4.10

658

ELEC-9.4.11

659

ELEC-9.4.12

660

ELEC-9.4.13

661

ELEC-9.4.14

662

ELEC-9.4.15

663

ELEC-9.4.16

664

ELEC-9.4.17

665

ELEC-9.4.18

666

ELEC-9.4.19

667
668

9.5
ELEC-9.5.1

669

670

671
672

673

ELEC-9.5.2

674

675

676
677

678

679

ELEC-9.5.3

680

681
682

683

ELEC-9.5.4

684

685

686
687

688

ELEC-9.5.5

689

690

691
692

693

694

ELEC-9.5.6

695

696
697

698

ELEC-9.5.7

699

700

701
702

703

ELEC-9.5.8

704

705
706
707

708

709

710

711
712

ELEC-9.5.9

713

ELEC-9.5.10

714

715
716
717

718

ELEC-9.5.11

719

720
721

722
723

724

ELEC-9.5.12

725

726
727
728

729

730

731

732
733

ELEC-9.5.13

734

ELEC-9.5.14

735

736

737
738

739

ELEC-9.5.15

740

741

742

743

744

ELEC-9.5.16

745

746

747

748

749

750

ELEC-9.5.17

751

752

753

754

ELEC-9.5.18

755

756

757

758

759

760

ELEC-9.5.19

761

ELEC-9.5.20

762

ELEC-9.5.21

763

ELEC-9.5.22

764

ELEC-9.5.23

765

ELEC-9.5.24

766

ELEC-9.5.25

767

ELEC-9.5.26

768

ELEC-9.5.27

769

ELEC-9.5.28

770

ELEC-9.5.29

771

ELEC-9.5.30

772

ELEC-9.5.31

773

ELEC-9.5.32

774

ELEC-9.5.33

775

ELEC-9.5.34

776

ELEC-9.5.35

777

ELEC-9.5.36

778

ELEC-9.5.37

779

780

ELEC-9.5.38

781

ELEC-9.5.39

782

ELEC-9.5.40

783

ELEC-9.5.41

784

ELEC-9.5.42

785

786

ELEC-9.5.43

787

ELEC-9.5.44

788

ELEC-9.5.45

789

ELEC-9.5.46

790

ELEC-9.5.47

791

792
793
794
795
796
797

ELEC-9.5.48
ELEC-9.5.49
ELEC-9.5.50
ELEC-9.5.51
ELEC-9.5.52
ELEC-9.5.53

798

799
800
801
802
803

ELEC-9.5.54
ELEC-9.5.55
ELEC-9.5.56

804

ELEC-9.5.58

805

ELEC-9.5.59

ELEC-9.5.57

806

807

808
809
810

ELEC-9.5.60

811

ELEC-9.5.61

812

ELEC-9.5.62

813

ELEC-9.5.63

814

ELEC-9.5.64

815

ELEC-9.5.65

816

ELEC-9.5.66

817

ELEC-9.5.67

818

ELEC-9.5.68

819

ELEC-9.5.69

820

ELEC-9.5.70

821

ELEC-9.5.71

822

ELEC-9.5.72

823

ELEC-9.5.73

824

825

ELEC-9.5.74

826

ELEC-9.5.75

827

ELEC-9.5.76

828

ELEC-9.5.77

829

ELEC-9.5.78

830

831

ELEC-9.5.79

832

ELEC-9.5.80

833

ELEC-9.5.81

834

ELEC-9.5.82

835

ELEC-9.5.83

836

ELEC-9.5.84

837

ELEC-9.5.85

838

ELEC-9.5.86

839
840

10.1

841

842

843
844

ELEC-10.1.1

845

ELEC-10.1.2

846

ELEC-10.1.3

847

848

849

850

851
852

ELEC-10.1.4

853

ELEC-10.1.5

854

855

856

857

858

ELEC-10.1.6

859

ELEC-10.1.7

860

ELEC-10.1.8

861
862

11.1
ELEC-11.1.1

863

ELEC-11.1.2

864

ELEC-11.1.3

865

ELEC-11.1.4

866

ELEC-11.1.5

867

ELEC-11.1.6

868

ELEC-11.1.7

869

ELEC-11.1.8

870
871
872
873

ELEC-11.1.9
ELEC-11.1.10
ELEC-11.1.11
ELEC-11.1.12

874

ELEC-11.1.13

875

ELEC-11.1.14

876

ELEC-11.1.15

877

ELEC-11.1.16

878

ELEC-11.1.17

879

ELEC-11.1.18

All the items to be used on work are of first quality & ISI and as approved by the Engineer In charge of the
Supply Rates for all the materials are based on market rates plus Sales Tax/ Material VAT.
Works Contract VAT for General/ Composition Scheme on finished items may be allowed as applicable.
SOR Rates for Building items are purely for guidance for the officers for preparation of estimates vide par
is
however responsible for proper rates as envisaged in para.45 of APPWD code.
ELEC-9.5.46
ELEC-9.5.47
1

ELEC-9.5.48
ELEC-9.5.49
ELEC-9.5.50
ELEC-9.5.51
ELEC-9.5.52
ELEC-9.5.53
2

ELEC-9.5.54
ELEC-9.5.55
ELEC-9.5.56

ELEC-9.5.57

ELEC-9.5.58

ELEC-9.5.59

6
7

ELEC-9.5.60

ELEC-9.5.61

ELEC-9.5.62

10
11

ELEC-9.5.63

12

ELEC-9.5.64

13

ELEC-9.5.65

14

ELEC-9.5.66

15

ELEC-9.5.67

16

ELEC-9.5.68

17

ELEC-9.5.69

18

ELEC-9.5.70

19

ELEC-9.5.71

20

ELEC-9.5.72

21

ELEC-9.5.73

22

ELEC-9.5.74
ELEC-9.5.75
ELEC-9.5.76
ELEC-9.5.77
23

ELEC-9.5.78

24

ELEC-9.5.79

ELEC-9.5.80
ELEC-9.5.81
25

ELEC-9.5.82

26
27
28
29
30
31
32
33
34
35

ELEC-9.5.83

36

ELEC-9.5.84

37

ELEC-9.5.85

38

ELEC-9.5.86

39

ELEC-9.5.87

10.1
40

41
42

ELEC-10.1.1

43

ELEC-10.1.2

44

ELEC-10.1.3

45

ELEC-10.1.4

ELEC-10.1.5

46

ELEC-10.1.6

ELEC-10.1.7

ELEC-10.1.8

47

11.1
ELEC-11.1.1

48

ELEC-11.1.2

49

ELEC-11.1.18

50

ELEC-11.1.3

51

ELEC-11.1.4

52

ELEC-11.1.5

1
2
3
4

53

ELEC-11.1.6

54

ELEC-11.1.7

55
56
57
58

ELEC-11.1.8
ELEC-11.1.9
ELEC-11.1.10
ELEC-11.1.11

59

ELEC-11.1.12

60

ELEC-11.1.13

61

ELEC-11.1.14

62

ELEC-11.1.15

63

ELEC-11.1.16

64

ELEC-11.1.17

NOTE
All the items to be used on work are of first quality & ISI and as approved by the Engineer In charge of the
Supply Rates for all the materials are based on market rates plus Sales Tax/ Material VAT.
Works Contract VAT for General/ Composition Scheme on finished items may be allowed as applicable.
SOR Rates for Building items are purely for guidance for the officers for preparation of estimates vide par
is however responsible for proper rates as envisaged in para.45 of APPWD code.

Description of Item

STATEMENT OF RATES FOR MATERIALS FOR THE YEAR : 2014-15 GENERAL GUIDE LINES FOR REVISING RATES OF MAT

GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS:


Average of the prevailing market rates, ignoring freak rates, shall be the criteria for fixing
market rates for materials.
The rates for materials shall be inclusive of all taxes, duties and other local levies.
The rates for materials shall be exclusive of seigniorage charges wherever applicable.
The rates for materials, except those for which lead charges are admissible as per the
statement of lead charges, shall be for all leads.
The rates provided for useful rubble / stone chips from excavation shall be at dump yard.
DESCRIPTION OF MATERIAL
Acetylene gas
Asphalt 80/ 100 Grade
Binding wire
Burnt stone slab 10 cm thick
Cement 43 Gr (including loading charges) * As per Monthly rates
Chequered plate
Coarse aggregate 10-4.75 mm(excluding seigniorage charges)
Coarse aggregate 20-10 mm(excluding seigniorage charges)
Coarse aggregate 40-20 mm(excluding seigniorage charges)
Coarse aggregate 80-40 mm(excluding seigniorage charges)
The aggregate rates mentioned above (from sl.no.7 to sl.no10) are inclusive of seigniorage charges of
Rs.50/ cum, blasting charges of Rs.70/cum and 25% machine crushing charges. However , if
the
metal is obtained from hand broken , the blasting and crushing charges shall be deducted. The
aggregate shall be HB Stone of Granite, Dolamite, Dolerite and Trap.( Quartzite and Basalt with
aggregate Impact of Less than 20)
Coir brush
Copper sheet 16 SWG
Coursed rubble stone 30 x 30 x 45 cm(excluding Seigniorage charges)
Coursed rubble stone 30 x 30 x 60 cm(excluding Seigniorage charges)
Curing Compound
D - cord
Delay - noiseless trunk
Detonating fuse coil
Detonating shock tube / Cord relays
Detonator delay type
Detonator electric
Detonator ordinary
Empty cement bag
Explosive ANFO
Explosive ANFO high strength booster

Explosive small dia ( Kelvex-220 or equivalent)


(a)Fine aggregate/ sand(un- screened) for concrete items & filter items) (excluding Seigniorage charges)
(b) Sand for filling(excluding Seigniorage charges)
Fine aggregate / sand ( screened )(excluding seigniorage charges)
Geo-textile ( filter fabric ) 160 gsm
Geo-textile ( filter fabric ) 200 gsm
Geo-textile ( filter fabric ) 250 gsm
G I Pipe 100 mm dia B Class
G I Pipe 15 mm dia A class
G I pipe 25 mm dia A class
G I pipe 40 mm dia B class
G I pipe 50 mm dia A class
G I Pipe 80 mm dia B Class
G.I Bolts / Nuts and Washers
G.I sheet ( plain )
Hariyala turfing sods
Hectometer stone one line dressed
Hemp yarn
Honne wood planks
Hume pipe with collar 150 mm dia
Hume pipe with collar 300 mm dia
J- Bolts 30 cm long
Jungle wood planks
Khandki stone 15 to 20 cm height
Khandki stone 20 to 25 cm height
Khandki stone 25 to 30 cm height
Kilometer stone one line dressed
LDPE sheet ( Geo membrane ) 500 micron thick
LDPE sheet ( Geo membrane ) 750 micron thick
LDPE sheet ( Geo membrane ) 1000 micron thick
M S Bolts / Nuts / Washers
Murum(including loading charges but excluding Seigniorage charges )
Oxalic acid
Oxygen gas
PVC sealing strip
PVC water stopper 310 mm wide
PVC pipe of 100 mm dia
Reinforcement steel (including loading charges) (HYSD/TMT )
Resin bond Cement capsule
Rough stone 20 x 20 x 75 cm ( excluding Seigniorage Charges)
Shahabad stone slab (excluding seigniorage charges and loading
charges)
Stone chips ( at dump yard / Spoil)(excluding seigniorage charges and loading charges)
Stone chips ( at quarry )(excluding seigniorage charges and loading charges)
Structural steel angle / channel / beam / bars (including loading
charges)
Structural steel plate / flats (including loading charges)

Super Plasticizer ( Conplast RP-264 or equivalent )


Synthetic Enamel paint 1st quality
Synthetic adhesive ( Resin + Hardener )
Tar felt joint filler board 12 mm thick
Tar felt joint filler board 20 mm thick
Through stones 20 x 20 x 30 to 45 cm long (excluding seigniorage charges and loading charges)
Through stones 25 x 25 x 45 to 60 cm long excluding seigniorage charges and loading charges)
Through stones 30 x 30 x 65 to 75 cm long(excluding seigniorage
charges and loading charges)
Un-coursed rubble stones ( at dump yard /Spoil )(including
seigniorage charges and loading charges)
Un-coursed rubble stones ( at quarry )(excluding seigniorage charges and loading charges)
Water proofing compound
Welding electrodes 4 mm dia
Wire brush
Wire mesh 20 gauge
Zinc chromate red oxide primer paint
inorganic zinc silicate
solvent less coal tar epoxy paint
Zinc phosphate primer
Allkyd based iron oxide paint
a) Cost of hdpe (80mm dia)
b) light black MS casing pipe
80mm steel
dia (4mm
thick) 100X100X5 mm size
welded
wire fabric
Protecitive mastic
Solventless coal tar epoxy (brown)

ADDITIONAL MATERIALS FOR GATES & HOISTS FOR THE YEAR : 2014-15
DESCRIPTION OF MATERIAL
Alloy steel ( IS : 1570-carbon steel ) shafts
Alloy steel ( IS : 1570-stainless steel ) pins
Bolt / Nut / Washer ( hot dipped galvanized )
Bolt / Nut / Washer ( stainless steel )
Bronze/Aluminum alloy(IS:305)bearings/bushes
Cast iron blocks
Cast steel drums / gears
Cast steel pinions
Cast steel wheels / pulleys / hubs / rollers / retainers
Chemical for de-greasing/ derusting/phosphate coating
Coal tar epoxy paint
Forged steel hooks / shackles
MS pipe 200 / 300 mm dia
MS pipe 32 mm dia
MS pipe 25 mm dia

Rubber bottom seal ( IS : 11855 )


Rubber side seal ( music note type Teflon claded ) ( IS : 11855 )
Rubber side seal ( music note type uncladed ) ( IS 11855 )
Rubber side seal Z-type ( IS : 11855 )
Rubber corner seal ( Teflon claded ) ( IS :11855 )
Rubber corner seal ( un claded ) ( IS : 11855 )
Stainless steel plates / flats
Welding electrode 4 mm dia x 450 mm ( radiographic low
hydrogen )
Welding electrode 4 mm dia x 450 mm ( stainless steel )
Wire rope 6x37 constn ( IS : 2266 )
Zinc
Zinc rich ( zinc content : 90 % ) epoxy primer
MATERIALS FOR POWER SUPPLY WORKS -2014-15
Electric pole with fixtures
Flood light 500 W
Flood light set
Flouscent tube light 40 W
Flouscent tube light set
HT / LT Circuit breaker with accessories
HT / LT Line conductor
PVC Armoured cable 10 sqmm and below
PVC Armoured cable 16 sqmm
PVC Armoured cable 25 sqmm
PVC Armoured cable 70 sqmm
DETAILS OF CAPITAL COST OF MACHINERY / EQUIPMENT FOR THE YEAR: 2014-15
GUIDE LINES FOR FIXING CAPITAL COST OF MACHINERY / EQUIPMENT
Agitator car / Transit mixer 2 cum ( excluding tyres )
tyres and tubes 6 sets
Air compressor 5 cmm electric
Air compressor 7 cmm diesel
Air compressor 7 cmm electric
Air compressor 8.5 cmm diesel
Air compressor 8.5 cmm electric
Air compressor 15 cmm electric
Angle Dozer 90 hp
Batching plant 0.5 cum with accessories
Batching plant 2 x 1.00 cum with accessories
Batching plant 2 x 1.50 cum with accessories
Bending machine
Clamp shell and hoisting ropes
Concrete bucket 1.5 cum
Concrete hand mixer 45/30 ltr
Concrete mixer 300/200 ltr(diesel)
Concrete mixer 300/200 ltr ( electric )

Concrete mixer 600/400 ltr(diesel)


Concrete mixer 600/400 ltr ( electric )
Concrete paver 100 Sqm / hr
Concete placer pump / hour
Convey mucker ( excluding tyres )
tyres and tubes 6 sets
Core drilling machine
Diesel generating set 30 KVA
Diesel generating set 50 KVA
Diesel Loco 45 hp
Dewatering pump 5 hp diesel
Dewatering pump 5 hp electric
Dewatering pump 5 hp electric
Dewatering pump 10 hp electric
Dewatering pump 20 hp diesel
Dewatering pump 20 hp electric
Drifter
Drilling jumbo ( excluding tyres )
tyres and tubes 6 sets
Dumper 4.5 cum ( excluding tyres )
tyres and tubes 6 sets
Geophysical Ele.resistivity meter
Grouting pump
Guniting / sand blasting equipment
Ice plant with accessories 30 t / day
Jack hammer
Needle vibrator 40 mm petrol
Needle vibrator 40 mm electric
Needle vibrator 60 mm petrol
Needle vibrator 60 mm electric
Planing machine 4 m stroke
Plate shearing machine up to 12 mm
Pneumatic placer 0.5 cum
Pneumatic tamper
Pug cutting machine
Pusher leg
Road roller diesel 10 t
Shovel 0.50 cum 75 hp
Shovel 0.85 cum 110 hp
Stationery derrick crane 5 t
Tipper 5 cum ( excluding tyres )
tyres and tubes 6 sets
Tipping tub 1.5 cum
Tower crane 5 tonne
Transformer 250 KVA
Truck 10 t ( excluding tyres )
tyres and tubes 6 sets

Truck mounted derrick crane 5 t ( excluding tyres )


tyres and tubes 6 sets
Upright drilling machine
Ventilation fan 20 hp
Vibratory pad foot roller 8 t
Wagon drill
Water tanker 8000 ltr (excluding tyres)
tyres and tubes 6 sets
Welding set
Winch 35 hp electric
Hydraulic Truck Crane 30T
tyres and tubes 6 sets
Hydraulic Truck Crane 16T
tyres and tubes 6 sets
Heavy Duty Aireliness Spray Painting Equipment
ACCESSORIES TO MACHINERY / EQUIPMENT FOR THE YEAR : 2014-15
DESCRIPTION OF MATERIAL
Casing shoe bit
Diamond core bit BX size
Diamond core bit NX size
Double tube core barrel
Extension drill rod with coupling sleeve
Jack hammer drill rod 1.5 m
Jack hammer drill rod 2.5 m
Nozzle for Guniting / sand blasting gun
Paving Cylinder
Rails 30R ( 30 kg / m )
Reamer shell
T.C.Cross bit 50 mm dia
T.C.Cross bit 75 mm dia
T.C.Cross bit 100 mm dia
Tyres and Tubes for truck
Wire rope 16 mm dia
Excavation of drain with Excavator
AGGREGATE CRUSHING & PROCESSING PLANT
DESCRIPTION OF MATERIAL
Jaw crusher 900 x 500 mm ( 120 tph ) with 50 hp motor
Jaw crusher 500 x 300 mm ( 60 tph ) with 30 hp motor
Jaw crusher 400 x 225 mm ( 10 tph ) with 25 hp motor
Jaw plates 900 x 500 mm ( serreted )
Jaw plates 500 x 300 mm ( serreted )
Jaw plates 400 x 225 mm ( serreted )

Nylon Conveyor belt 3 ply 600 mm width


Nylon Conveyor belt 3 ply 1000 mm width
OTHER COSTS ON MATERIAL / MACHINERY / EQUIPMENT FOR THE YEAR : 2014-15
DESCRIPTION OF MATERIAL
Air hose 25 mm dia
Air hose 50 mm dia
Demand charges ( HT-2B ) on power supply
Diesel
Electric power ( HT-2B category ) including tax
Excise duty on Gates / Hoist supplies
Insurance charges on machinery
Interest on capital cost
Lubricants
Petrol
Rivets
Road tax on transport vehicles
Shalimastic sealing compound
Shutter oil
Structural steel fabrication
Sundries ( Lump sum for un quantified inputs )
Water hose ( pressure ) 20 mm dia
Steel wedges
Elbows / Nipple / Plugs etc.,
Soldering materials
Steam circulation arrangement
Fuel charges ( gas for heating )
Vulcanizing materials
Other accessories / controls / junctions
Miscellaneous fittings / switches etc
Anchors / supports for cables / lights
Civil works for foundations / pedestals / duct etc
Gas cutting set ( 2 Nos 15 m hose and nozzle unit )
Grease
Welding holder set ( cable / holder / gloves / mask etc )
Use rate of ropes
MATERIALS FOR GATES AND HOISTS FOR THE YEAR : 2014-15
DESCRIPTION OF MATERIAL
Worm reducers
Electric motor 20 hp(Double Shaft)
Electric motor 17.5 hp(Double Shaft)
Electric motor 12.5 hp(Double Shaft)
Electric motor 5 hp(Double Shaft)
Electric motor 3 hp (Double Shaft)
Electric motor 2 hp (Double Shaft)
Floating shaft 300 mm dia
Manual operating system

Gate position indicator


Ele-magnetic brake
Electric cable / switch / control panel etc
Wire rope sockets
Other "Over Heads" to be added in the Basic Data wherever applicable for Irrigation Work Items
Add for Contractors' Overheads and profit including Labour
importation
VAT @
Add for blasting studies & monitoring vibrations etc @
Add for shifting & re-erection of BP @
Add for LH / RH shifting & erection of Paver @
Add for ledge cutting / erection of tracks etc @
Apportioned hire charges of machinery @ for lining slab
Apportioned cost of labour @ for lining slabs
Apportioned hire charges of machinery @ for lug slabs
Apportioned cost of labour @ for lug slabs
Add for repairs/ replacements/ catwalks etc., @
Add for binding wire/ temporary supports etc., @
Add for scaffolding @
Add for labour for scaffolding @
Add for scaffolding materials @
Deduct salvage value on machinery @
Add for excise duty on 75% cost excluding cost of materials @
Add for transportation up to work site @
Add for Air and Water line @
Add for Ventilation @
Add for Lighting @
Add for Ele sub-station / Demand charges @
Add for conveyor system @
Add for trestle bridge for tower crane truck @

Materials other than covered under irrigation


For the year 2014-15
GENERAL GUIDE LINES FOR REVISING RATES OF MATERIALS
Average of the prevailing market rates, ignoring freak rates, is the criteria for Fixing market rates for materials
The rates for materials is inclusive of all taxes, duties and other local levies.
The rates for materials is exclusive of Seigniorage charges wherever applicable.
The rates for materials, except those for which lead charges are admissible as per the Statement of lead
Description
Quarried stone 150 - 200 mm size for Hand Broken (Excluding lead charges)
Boulder with minimum size of 300 mm for Pitching
Coarse Sand for filling(excluding seigniorage charges)
Coarse sand for Mortar (excluding seigniorage Charges)
Fine sand (excluding seigniorage charges)
Moorum (excluding seigniorage charges)
Gravel/Quarry spall
Granular Material or hard murrum for GSB works
Granular Material or hard murrum for GSB works
Fly ash conforming to IS: 3812 ( Part II & I)
For item No.M-012 to M-029 the note shall be as follows
1) The rates mentioned are exclusive of Seigniorage charges of
Rs.50/ cum but, including blasting charges of Rs.70/cum and 25% machine crushing charges. However, if
the metal is obtained by hand broken, machine crushing charges shall be deducted.
2) If the material is obtained by hand broken from surface boulders/canal spoil ,the blasting and crushing
charges shall be deducted.
3) The material shall be HB Stone of Granite, Dolamite, Dolerite
and Trap.(Quartzite and Basalt with aggregate impact of less than 20)

Filter media/Filter Material as per Table 300-3 (MoRT&H Specification)


Close graded Granular sub-base Material 53 mm to 9.5 mm
Close graded Granular sub-base Material 37.5 mm to 9.5 mm
Close graded Granular sub-base Material 26.5 mm to 9.5 mm
Close graded Granular sub-base Material 9.5 mm to 4.75 mm
Close graded Granular sub-base Material 9.5 mm to 2.36 mm
Close graded Granular sub-base Material 4.75mm to 2.36 mm
Close graded Granular sub-base Material 4.75mm to 75 micron mm
Close graded Granular sub-base Material 2.36 mm
Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve.
Coarse graded Granular sub-base Material 2.36 mm & below
Coarse graded Granular sub-base Material 4.75mm to 75micron mm
Coarse graded Granular sub-base Material 4.75 mm to 2.36 mm
Coarse graded Granular sub-base Material 9.5 mm to 4.75 mm
Coarse graded Granular sub-base Material 26.5 mm to 4.75 mm
Coarse graded Granular sub-base Material 26.5 mm to 9.5 mm
Coarse graded Granular sub-base Material 37.5 mm to 9.5 mm
Coarse graded Granular sub-base Material 53 mm to 26 .5mm
Aggregates below 5.6 mm
Aggregates 22.4 mm to 2.36 mm
Aggregates 22.4 mm to 5.6 mm

Aggregates 45 mm to 2.8 mm
Aggregates 45 mm to 22.4 mm
Aggregates 53 mm to 2.8 mm
Aggregates 53 mm to 22.4 mm
Aggregates 63 mm to 2.8 mm
Aggregates 63 mm to 45 mm
Aggregates 90 mm to 45 mm
Aggregates 10 mm to 5 mm
Aggregates 11.2 mm to 0.09 mm
Aggregates 13.2 mm to 0.09 mm
Aggregates 13.2 mm to 5.6 mm
Aggregates 13.2 mm to 10 mm
Aggregates 20 mm to 10 mm
Aggregates 25 mm to 10 mm
Aggregates 19 mm to 6 mm
Aggregates 37.5 mm to 19 mm
Aggregates 37.5 mm to 25 mm
Aggregates 6 mm nominal size
Aggregates 10 mm nominal size
Aggregates 13.2/12.5 mm nominal size
Aggregates 20 mm nominal size
Aggregates 25 mm nominal size
Aggregates 40 mm nominal size
AC pipe 100 mm dia
Acrylic polymer bonding coat
Aluminum Paint
Aluminum alloy plate 2mm Thick
Aluminum alloy/Galvanised steel
Aluminum sheeting fixed with encapsulated lens type reflective sheeting including 2% towards lettering,
cost of angle iron, cost of drilling holes, nuts, bolts etc. and signs as applicable
Aluminum studs 100 x 100 mm fitted with lens reflectors
Barbed wire
Bearing (Cost of parts)
Bearing (Cast steel rocker bearing assembly of 250 tonne )
Bearing (Elastomeric bearing assembly consisting of 7 internal layers of elastomer bonded to 6 nos.
internal reinforcing steel aminates by the process of vulcanisation,)
Bearing (Forged steel roller bearing of 250 tonne)
Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE pads
providing sliding surfaces against stainless steel mating together with cast steel assemblies/fabricated
structural steel assemblies duly painted with all components
Bearing (PTFE sliding plate bearing assembly of 80 tonnes )
Bearing (Supply of sliding plate bearing of 80 tonne)
Bentonite
Binding wire
Bitumen ( Cationic Emulsion )
Bitumen (60-70 grade)(Excluding taxes)

Bitumen (80-100 grade ) (Excluding taxes)


Bitumen (Cutback )
Bitumen (emulsion)(Excluding taxes)
Bitumen (modified graded)
Brick
C.I. shoes for the pile
Cement
Cold twisted bars (HYSD/TMT Bars)
Collar for joints 300 mm dia
Compressible Fibre Board(20mm thick)
Connectors/ Staples
Copper Plate(12m long x 250mmwide)
Corrosion resistant Structural steel
Corrugated sheet, 3 mm thick, "Tie" beam section railing
Credit for excavated rock found suitable for use
Curing compound
Delineators from ISI certified firm as per the standard drawing given in IRC - 79
Earth Cost or compensation for earth taken from private land (Excluding seigniorage charges) (Vide
ENC/IW-Correction slip-1)
Elastomeric slab seal expansion joint assembly manufactured by using chloroprene, elastomer for
elastomeric slab unit conforming to clause 915.1 of IRC: 83 (part II),
Electric Detonators @ 1 detonator for 1/2 gelatin stick of 125 gms each
Epoxy compound with accessories for preparing epoxy mortar
Epoxy mortar
Epoxy primer
Epoxy resin-hardner mix for prime coat
Flag of red color cloth 600 x 600 mm
Flowering Plants
Galvanised MS flat clamp
Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls of
required size.
Galvanised structural steel plate 200 mm wide, 6 mm thick, 24m long
Gelatin 80%
Geo grids
(a)Geo membrane 500 micron thick
(b) Geo membrane 750 micron thick
(c) Geo membrane 1000 micron thick
Geo nets
(a)Geo textile 160 gsm
(b) Geo textile 200 gsm
(c) Geo textile 250 gsm
Geo textile filter fabric
GI bolt 10 mm Dia
Grouting pump with agitator
Grass (Doob)
Grass (Fine)
HDPE pipes 75mm dia

HDPE pipes 90mm dia


Hedge plants
Helical pipes 600mm diameter
Hot applied thermoplastic compound
HTS strand
Joint Sealant Compound
Jute netting, open weave, 2.5 cm square opening for seeding and Mulching
LDO for steam curing
M.S. Clamps
M.S. Clamps
M.S. shoes @ 35 Kg per pile of 15 m
Mild Steel bars
Modular strip/box seal expansion joint including anchorage catering to a horizontal movement beyond 70
mm and up to 140mm assembly comprising of edge beams, central beam, 2 modules chloroprene seal,
anchorage elements, support and control system, all steel sections protected against corrosion and
installed by the manufacturer or his authorised representative
Modular strip/box seal expansion joint catering to a horizontal movement beyond 140mm and up to
210mm box/box seal joint assembly containing 3 modules/cells and comprising of edge beams, two
central beams, chloroprene seal, anchorage elements, support and control system, all steel sections
protected against corrosion and installed by the manufacturer or his authorised representative

Nipples 12mm
Nuts and bolts
Paint
Pavement Marking Paint
Paving Fabric
Perforated geo synthetic pipe 150 mm dia
Perforated pipe of cement concrete, internal dia 100 mm
Pesticide
R.C.C Pipes 200 mm dia, 2.5 m long for drainage
Plastic sheath, 1.25 mm thick for dowel bars
Plastic tubes 50 cm dia, 1.2 m high
Polymer braids
Pre moulded Joint filler,25 mm thick for expansion joint.
Pre-coated stone chips of 13.2 mm nominal size
Preformed continuous chloroprene elastomer or closed cell foam sealing element with high tear
strength, vulcanised in a single operation for the full length of a joint to ensure water tightness.
Pre-moulded asphalt filler board
Pre-packed cement based polymer concrete of strength 45 Mpa at 28 days
Primer
Quick setting compound
Random Rubble Stone(Including Loading Charges but excluding Seignorage Charges)
RCC Pipe NP 4 heavy duty non pressure pipe 1000 mm dia
RCC Pipe NP 4 heavy duty non pressure pipe 1200 mm dia
RCC Pipe NP 4 heavy duty non pressure pipe 300 mm dia
Reflectorising glass beads

Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Copper Strips)


Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Galvanised carbon steel strips)
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Glass reinforced polymer/ fiber
reinforced polymer /polymeric strips)
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Stainless steel strips)
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. Aluminum strips)
Rivets
Sand bags (Cost of sand and Empty cement bag)
Sapling 2 m high 25 mm dia
Scrap tyres of size 900 x 20
Seeds(Grass)
Cost of Selected earth (Excluding Seignorage Charges)
Separation Membrane of impermeable plastic sheeting 125micron thick
Sheathing duct
Shrubs
Sludge / Farm yard manure @ 0.18 cum per 100 sqm at site of work for turfing
Sodium vapour lamp
Square Rubble Coursed Stone
Steel circular hollow pole of standard specification for street lighting to mount light at 5 m height above
deck level
Steel circular hollow pole of standard specification for street lighting to mount light at 9 m height above
road level
Steel drum 300 mm dia 1.2 m high/empty bitumen drum
Steel helmet and cushion block on top of pile head during driving.
Steel pipe 25 mm external dia as per

IS:1239

Steel pipe 50 mm external dia as per

IS:1239

Steel wire rope 20 mm


Steel wire rope 40 mm
Strip seal expansion join
Structural Steel(HYSD/TMT bars)
Super plasticizer admixture IS marked as per 9103-1999
Synthetic Geo grids as per clause 3102.8 and approved design and specifications.
Through and bond stone (a) 20X20x30 to 45 cm long
Through and bond stone (b) 25X25x45 to 60 cm long
Through and bond stone (c) 30X30x65 to 75 cm long
Tie rods 20mm diameter
Tiles size 300 x 300 mm and 25 mm thick
Timber
Traffic cones with 150 mm reflective sleeve
Tube anchorage set complete with bearing plate, permanent
edges
etc lime
Un slaked
Water charges (Urban)

Water charges (Rural)


Water based cement paint
Welded steel wire fabric
Wire mesh 50mm x 50mm size of 3mm wire
Wooden ballies 2" Dia for bracing
Wooden ballies 8" Dia and 9 m long
Wooden packing
Wooden staff for fastening of flag 25 mm dia, one m long
Printing new letter and figures of any shade (ii) English Roman
Painting Two Coats on New Concrete Surfaces
Painting angle iron post two coats
Miscellaneous Items
Benching old embankment slopes 0.45 X 0.45 M
Filling sand bags and laying in position at work site, complete including CP & OH charges
Rough stone for revetment 225mm thick (excluding seigniorage
charges)
Eradication of Weed growth from Drains,Canals by spraying Chemicals
Thinner
Gear oil

Description
RATES OF LABOUR (SKILLED WORKMEN)
1. Caulker
2. Plumber 1st Class
3. Plumber 2nd Class
4. Sewer Cleaner
5. Well Sinker
6. Pipe line Fitter 1st Class
7. Pipe line Fitter 2nd Class
8. Pump Driver
9. Bore Mechanic
10. Light Vehicle Driver
Note: The rate at relevant item in common SOR is applicable for occasional employment.

RATES FOR EARTH WORK :


Earth work excavation in all soils for pipe lines, for drainage and water supply, where the depth is more
than 1.5 times the width.
Earth work excavation in all soils for pipe lines, for drainage and water supply, where the depth is less
than 1.5 times the width.
Earth work excavation in all soils for open trenches, for valve pits, inspection chambers, etc.
Excavation of pipe line trenches for drainage and water supply in rock requiring blasting with initial lead
and lift including cost of blasting materials where the depth is more than 1.5 times the width, in places
where there is no habitation.
Excavation of pipe line trenches for drainage and water supply in rock requiring blasting with initial lead
and lift including cost of blasting materials where the depth is less than 1.5 times the width, in places
where there is no habitation.
Cutting rock for pipe line trenches by hammers, nuckles and chisels including stacking where the depth is
1.5 times or more than the width.
Cutting rock for pipe line trenches by hammers, nuckles and chisels including stacking where the depth is
less than 1.5 times the width.
Cutting rock for works other than pipe lines trenches by hammers, nuckles and chisels including stacking.
For controlled blasting at restricted places
NOTE :- Rock should be measured in solids. In case it is not possible, stacks should be made in
which case 40% for voids to be deducted from the stack measurements.
Loading or unloading materials such as C.I. Pipes, PVC Pipes, AC Pressure Pipes, DI Pipes, SW
Pipes, PVC Pipes, A.C/Specials less than 300 mm dia up to 4 m in length including stacking.
C.I. Pipes/D.I. Pipes and fittings
A.C. Pipes & Specials
Stoneware pipes & Specials
P.V.C. Pipes and fittings
Loading or unloading materials such as C.I. Pipes, DI pipes, SW pipes, AC pressure pipes & fittings/
specials from 300 mm to 600 mm dia up to 4 m in length including stacking.
C.I. Pipes/D.I. Pipes and fittings
A.C. Pipes & Specials
Stoneware pipes & Specials
Loading or unloading materials such as C.I. Pipes, DI pipes, PVC pipes, AC pipes less than 300 mm
dia, above 4 m in length including stacking.
C.I. Pipes/D.I. Pipes and fittings
A.C. Pipes & Specials
P.V.C. Pipes and fittings
Loading or unloading materials such as C.I. Pipes, DI pipes, AC pipes from 300 mm to 600 mm above 4
m in length including stacking.
C.I. Pipes/D.I. Pipes and fittings
A.C. Pipes & Specials
Note:- For loading and unloading the above materials at Railway Stations, the rates may be
adopted based on the competitive quotations or the hammalae charges if prevailing.

Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and
laying them true to alignment and gradient including all sundries but excluding cost and conveyance of
pipes from source of supply (Ref to specifications. BIS No.3114/1994)
DIAMETER OF PIPE/Fittings in mm :
80mm to 1000mm dia

Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with flanged ends carefully into trench
and laying them true to alignment and gradient including all sundries but excluding cost and conveyance
of pipes from source of supply. (Reference to specifications. BIS No.3114/1994)
DIAMETER OF PIPE/Fittings in mm :
80mm to 750mm dia
800
900
1000
1100
1200
Jointing CI /DI pipes & fittings with s/s ends including cost of pig lead,hemp yarn and sundries such as
cost of fuel for melting lead, filling with water with lead up to 500m and testing to required pressure
complete. (Reference to specifications. BIS No.3114/94/12288:1997)
DIAMETER OF PIPE/Fittings in mm :
80mm to 800mm
900
1000
1100
1200
Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint),excluding the cost of the gasket but
including all sundries filling with water, with a water lead up to 500m and testing to required
pressure, etc. complete (Reference to specifications IS 3114/1994/12888/1997)
DIAMETER OF PIPE/Fittings in mm :
80mm to 1000mm dia
Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts,
rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required
pressure complete. (Reference to specifications. BIS No.3114/1994.)
DIAMETER OF PIPE/Fittings/ valve in mm :
80mm to 750mm dia
800
900
1000
1100
1200
Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient,
jointing RCC pipes with cement joints including curing, the cost of jointing materials i.e., Cement Mortar
(1:1.5), hemp yarn etc., and testing
including filling with water with a water lead up to 500 metres
excluding cost of rubber rings as per BIS No.783/85.
per every 25 mm dia.
Lowering the RCC S/S pipes carefully into the trenches laying them rue to alignment and gradient, jointing
with rubber rings and testing including filling with water with a water lead up to 500 meters including cost
of rubber rings as per BIS No. 783/1985
per every 25 mm dia.
80mm to 600mm
700

800
900
1000
Lowering and Jointing G.I. pipes and specials / fittings including excavation of trench of 0.5m width and
0.50 m depth in all soils except rock requiring blasting and refilling trenches after laying and jointing pipes
and also including cost of jointing materials but excluding the cost of pipes. Reference to specifications.
BIS No.783/85
G.I. PIPES :
DIA in mm
15mm to 150mm

Laying, jointing of PVC/HDPE pipes as per BIS No.7634 part-III/75 for


PVC and BIS No.7634 part-II/75 for HDPE pipes.
DIA in mm
50
40
32
25
20
NOTE :- (i) The above rates are applicable for the works in istrict only.
(ii) If the depth of excavation is more than 0.5 m separate rates to be worked out.
Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of Stone
ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn but
excluding cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72)
DIA of Pipes in mm .
100mm to 450mm
Lowering, laying, jointing and testing to hydraulic test pressure including cost of water with minimum
water lead of 500m for UPVC pressure pipes in ready made trenches true to alignment and gradient
including all sundries but excluding cost & conveyance of pipes from source of supply and jointing
materials as per BIS No.7634 - Part III - 1975
DIA of Pipes in mm .
63mm to 315mm
Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 part-II/1975 as amended
from time to time to the alignment and gradient and testing the pipeline to the required pressure.
Outer Dia of pipes in MM
63
75
90
110
125
140
160
180
200
225
250
280
315
355
400
450
NOTE:- For item 9 to 16 the element of testing charges is to be considered as 20% of the combined
rate for laying, jointing and testing. This 20% shall be released only after satisfactory testing of
the pipe line to the required pressure.
Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel & Reflex valves)
excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces

Dia of Valve in mm.


80mm to 450mm
Labour charges for fixing Air valves including boring the mains and threading the bore fixing nipple etc.,
complete.
Dia of Air valve in mm.
25
40
50
65
80
100
125
150
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air
Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.
Dia of Air valve in mm.
25
40
50(Double Air valves)
65
80
100
125
150
Uprooting C.I./ DI Pipes by melting the lead, loosening the joints, scraping the pipes, hoisting and
keeping within a lead of 10 m but excluding earth work excavation and refilling.
80mm to 600mm
Uprooting of RCC pipes including breaking the collars, loosening the joint, separating the pipes, hoisting
and keeping within a lead of 10 m but excluding earthwork excavation and refilling.
100mm to 300mm
Removing old G.I. pipes and specials / fittings and cleaning, scraping the pipes, hoisting and keeping with
in 50m lead but excluding earth work excavation of trenches and refilling.
Dia of Pipes in mm
15mm to 50mm
Cutting C.I./ DI Pipes without water in mains. Dia of pipes in mm.
Dia of Pipes in mm
80mm to 600mm
680
700
750
800
900
1,000
1,100
1,200

Cutting A.C. Pipes without water in mains. Dia of pipes in mm.


Dia of Pipes in mm
80
100
125
150
200
250
300
350
400
450
500
600
Drilling and tapping CI/ DI / GI Main and fixing brass screw down ferrule and plug.
10 mm to 20mm
25 mm to 40mm
Cutting road surface including stacking of excavated materials for pipe line trench work.
a) Cutting open B.T. road surface (as well as asphalt concrete up to 75 mm thick) including water bound
macadam
b) Cutting open C.C. road surface
c) Cutting open water bound macadam road including soiling
Bailing out water.(For PH item)
a) Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges,
fuel charges and wages for Driver and Helper.
b) Bailing out water from the pipe line trenches with Electric Driven pump set including hire charges,
current charges and wages for
Driver and Helper.
NOTE:- The rate is payable on the total H.P. hours ignoring fractions less than 0.5 HP hour and
rounding off 0.5 HP hour or more to the next higher integer.
Shoring and strutting of trenches for water and sewer main.
a) Single Staging from (0 to 2.5 Mts.)
b) Double staging from (2.5 m to 4.5 Mts.)
Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches.
Excavation of trenches for infiltration galleries, syphon lines and connecting mains in all soils under
water including all leads, lifts, shoring, strutting, bailing out water and removal of shoring and strutting
materials, after completion of pipe line work.
a) 0 to 1 m deep under water.
b) 1 to 2 m deep under water.
c) 2 to 5 m deep under water.
d) Beyond 5 m deep under water for every additional 1 m depth over item 'c'
NOTE:- The above rates do not include rock requiring blasting or chiseling

Laying and jointing perforated RCC pipes inclusive of bailing out water and jointing with cement
fillets and all other incidental charges for infiltration gallery inclusive of bailing out water by pumping to
keep the trench reasonably dry to facilitate the work excluding cost of perforated pipes and collars.
per every 25 mm dia.
Centering and scaffolding charges for RCC members including all materials and labour
charges for forming and dismantling.
for R C C Elevated Service Reservoir of staging up to 15 metre below L W L.
1) Slabs for thickness (150 mm to 300 mm)
2) Slabs for thickness above (300 mm)
3) Side walls curved surfaces.
4) Side wall straight surfaces.
5) Dome.
6) Roof Slab.
7) Column braces and beams
8) Circular braces, ring beams & circular column.
Note:- For RCC ELSR of staging above 15 m, the % increase in these rates shall be as follows.
15-18 m
--- 9%
18-21m
--- 15%
21-24 m
--- 21%
24 m -27m
--- 27%
above27m
--- 30%
For Ground level works :1) Slabs
2) Beams & Lintels
3) Sun shades
4) RCC vertical walls of plane surface up to 3 m height such as ground level tanks clarifiers and sludge
digesters etc.
5) RCC vertical walls of circular faces up to 3 m height.
NOTE:- Scaffolding for every extra height of 1 m or part thereof but not less than 0.5 m. The above
centering charges are aplicable for water retaining structures only.
Lift or delift of materials :
a) Lifting of cement concrete for RCC elevated reservoir. For every 3m height or part thereof over the
initial lift of 5 m
b) Delifting the materials such as stones, concrete etc., for concrete below ground level for construction of
masonry ground level reservoirs, construction of masonry ground level reservoirs, inspection wells,test
wells and sump wells etc., for every 1 m depth or part thereof beyond the initial depth of 3 meters from
ground level.
Labour charges for fixing ventilating shafts complete with all accessories.
Labour charges for fixing water closets including fixing of foot rests (for all sizes).
Labour charges for fixing of flushing cistern including fixing of flush pipes, lead pipe, jointing etc.,
complete
Labour charges for fixing wash hand basin including fixing of inlet and waste pipe connections etc.,
complete
Fixing urinal with inlet and waste pipe connections etc., complete.
Refilling the trench for pipe line with excavated earth including watering and tamping etc., complete

Extra allowance for isolated scattered works viz., valve pits /chambers, public fountains, meter pits
and manholes, delivery cistern etc., complete.
Repairs to the existing mains, interconnections, replacement of valves/specials etc., including the
cutting ,jointing, bailing out of water, drying, earth work excavation etc., complete.
Removal of wet silt and sludge from sullage drains with aid of baskets and vessels.
Well sinking in sandy and other loose soils under water either by manual labour, divers, or dredgers,
weighting the top of staining to assist sinking etc., including dewatering and other incidental charges such
as hire charges for mechanical equipment etc
Up to 2 m below GL/m
From 2 to 4 m below GL/m
From 4 to 6 m below GL/m
From 6 to 8 m below GL/m
From 8 to 10 m below GL/m
Note:-Below 10 m for every metre depth or part
observed data is to be prepared and got approved.

thereof add Rs.250/- per m. For higher dia,

Sinking in Hard strata other than rock but in soils like limestone,gravel, clay under water including,
pumping dewatering, hire charges for mechanical equipment etc., complete.
Rates for OHSRs/ELSRs including fixtures with a staging of 15 m, without Seismic analysis.
500 Kilo litres
1000 Kilo litres
1500 Kilo litres
2000 Kilo litres
2500 Kilo litres
1) The above rates are arrived with base rate of Cement Rs.4000/- per MT & Steel for Rs.46,500/- per MT
for the month of May 2014
2) All concrete components shall be designed with M30 Design Mix proportion.
3) For intermediate capacities proportional rates shall be adopted.
4) The foundations shall be designed for Annular Raft Footings.The above rates are applicable for
Elevated Level Services Reservoirs / OHSRs for SBC of 15 T/Sqm.
a) For every decrease of 2.50 T/Sqm of SBC, the rate shall be incresed by

2.50%onbasicrate.

b) For every increase of 2.5 T/Sqm of SBC, the rate shall be decreased by

1.0%onbasicrate.

c) For SBC below 10T/sqm , solid raft shall be provided and for solid raft the rate shall be increased by

10%onbasicrates
5) For staging less than 15 m, the rate shall be decreased by Rs.0.05 paise on basic rate per litre per
every metre decrease in staging.
6) For staging above 15 m, the rate shall be increased by Rs.0.10 paise on basic rate per litre per every
metre additional staging.
7) The above rates shall be increased / decreased due to increase/decrease in the cost of cement by
Basic rate x (Rc-4000) x 0.00007
Rc = Rate of Cement (Rs per MT) at the time of preparation of estimate.

8) The above rates shall be increased / decreased due to increase/decrease in the cost of Steel by Basic
rate x (Rs-46,500) x 0.00002 Rs = Rate of Steel (Rs per MT) at the time of preparation of estimate.
9) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the Reservoir
including roof.
10) The above rates are adopted for preparation of estimate for construction of ELSRs/OHSRs for
finished work including 2 coats of weather proof emulsion painting for external surfaces, lettering, all
required fixtures, Pipes,Pipe specials, valves of DI material, Valve chambers etc., for pipe connections
including cost of pipes,specials and valves as per departmental designs and drawings.
11) The above rates adopted for a wind pressure upto "350 kg/sq m". For every 100 kg/sqm decrease in
wind pressure, the rate shall be decreased by 5%
12) For tribal/Agency / Rural area, the above rates shall be increased by 10%
13.The Basic rate is adopted by considering the design for Seismic forces for Zone-I & II only of seismic
zones.
a) The basic rates shall be increased by

33

1/3

% for Zone-III of seismic zones.

14. The ELSR/OHSR shall be designed with minimum of two rows of columns for capacities above 500
KL & upto 1000KL.
15. The ELSR/OHSR shall be designed with minimum of three rows of columns for capacities above
1000KL.
16) The basic rate is inclusive of following Fixtures
i) Pipe connections & Specials with D.I materials
a) All pipe conections for Inlet, Out let, Over Flow, Scour pipes shall be provided with D/F DI material.
b) The Valves for above pipe connections also shall be of DI material of PN 16
c) All specials such as Bends,Tees, Reducers, Duckfoot Bends,Bell mouths etc,. shall be of DI material.

II) The sizes of the verticals for ELSR/OHSR shall be:


a) For 500 KL to 750 Kl ELSRs
Inlet Pipe - 300mm dia.
Out let Pipe - 350mm dia
Over Flow pipe - 350m dia
Scour Pipe - 200mm dia
b) For 800 KL to 1500 Kl ELSRs
Inlet Pipe - 400mm dia.
Out let Pipe - 450mm dia
Over Flow pipe - 450m dia
Scour Pipe - 200mm dia
c) For above 1500 KL to 2500 Kl ELSRs
Inlet Pipe - 400mm dia.
Out let Pipe - 500mm dia
Over Flow pipe - 500m dia
Scour Pipe - 200mm dia
iii) Manhole Frames & Covers
a) All man hole Frames & Covers shall be made of CI/DI materials with min. size of 0.60mX 0.60m - For
Roof & Valve Chambers.
iv) CI/D.I Double Swan neck ventilators (min.of 150mm dia) shall be provided in top dome and slab with
mosquito/fly proof nets - 4Nos.
v) RCC Finial ventilator with fly/bird protection with GI mesh - 1 No.
vi) RCC precast ladders of 0.60 m width - 2 Nos.

vii) RCC dog legged stair case of 1.00 m flight width and 1.20 m landing width R.C.C hand railing of 1.0
m height 1 No
viii) The staircase shall be enclosed with brick masonary walls on three side and collapsible MS gate on
front side up to 1st brace level, to prevent unauthorized entry.
ix) Construction of R.C.C valve chambers as per Standard Drawings with RCC cover slab fixed with CI/DI
manhole Frame & Cover with lock and Key arrangement.The Mix shall not be less than VRCC M 20
grade with 150mm thick side walls, 150mm thick top slab, 150mm thick base slab over base course of
100mm thick (1:4:8) prop.
x) Balcony of 1.00 m width at floor slab level / middle ring beam level by using Stainless Steel pipe of
grade 304 hand railing up to 1.20 m height, with top railing of 40mm dia pipe & middle railing of 25mm dia
and verticals with 40mm dia at an interval not more than of 1.00m c/c.
xi) Water Level Indicator of reputed make Digital type (1 No) and Conventional type (1 No)
xii) Lightening Arrestor with all its accessories complete including earthing,with relevant IS Codes - 1 No.
xiii) Compound wall: Construction of compound wall including ornamental M.S.Gate of size 3.0 X 2.40m is
included in the basic rate of ELSRs. Length of compound wall shall be minimum of 150m. Min. height of
the compound wall shall be 1.80m above plinth and thickness 230mm in brick masonry in CM(1:6).The
compound wall shall be constructed including earth work excavation in all types of soils for plinth beam of
230mm X 300mm and 0.75X0.75X1.20m size for column footing portions. The footings shall be of
0.75X0.75X0.25m in VRCC M20 grade and constructed over a C.C (1:4:8)prop bed of 100mm thick. The
columns shall be of 230X230 mm in size with VRCC M20 grade at 3.00m c/c spacing, having depth of
1.20m below ground level and height of 2.00m above GL. The plinth beam of size of 230X300 mm shall
be constructed in VRCC M20 grade at Gound level, over a bed of CC(1:4:8)-100mmthick. 450X450mm
size columns in M20 grade shall be constructed for gate pillars. All the materials shall be followed as per
the standards.

Tie beam shall be provided above the brick work with 230X200mm size, fixed with MS angulars of 25mm
X 25mm X 4mm in "Y" shape to hieght of 0.60m, with embedded length of 150mm in concrete. The
barbed wire fencing with 3 ply of 18 gauge shall be streched in 4 rows (2x2). Plastering shall be done with
16mm thick in two coats i.e., base coat 12mm thick in CM(1:6)prop and 4mm thick 2nd coat CM(1:4) prop
on both sides of brick work.
Snowcem paint in two coats shall be provided for both sides of wall. The M.S ornamental gate as per the
approved drawings shall be provided with minimum of 3.60mts width and 2.40mts height with enamel
paint. Yard lighting shall be arranged on four corners of compound wall. If the length of the wall is
increased/decreased
NOTE:- Note:-For every 1m increase/decrease in length of compound wall the increase/decrease in basic
rates of ELSRs of the capacities from 500KL to 2500KL shall be as follows:
500KL-------------- 0.086%
1000KL ------------ 0.047%
1500KL ------------ 0.034%
2000KL ------------ 0.026%
2500KL ------------ 0.022%
xiv) Staff Quarter shall be constructed for a minimum plinth area of 40 sqm with the following specification:
RCC framed structure withconcrete grade not less than M20 design mix at the locations specified by the
department at the time of execution with verandah, hall, bed room, kitchen and bath &W/C with floor area
of 40.00sqmts excluding balconies and staircases.

MS hollow door frame with cold rolled processed steel sheet 1.25mm thick bright CRCA conforming to IS
4351/76, Flush door shutters with solid bond wood bond board doors shall be provided. N.C.L. Windows
centre fixed both sides openable shutter window 1.35 X 1.35mts outer frame section 48 x50mm shutter
frame section with a size of 48 X20 mm mullion section of size 48 X 50mm fixed beading section of 12 X
12 mm shall be provided. Flooring with polished Kadapa stone shall be provided. Walls shall be provided
with snowcem paint in two coats over primary coat. Electrical and water supply arrangement shall be
provided as directed by dept officer. Water Storage tank made with plastic/polymer material of reputed
make with necessary out let and inlet connection pipes shall provided. Septic tank for 5 users shall be
provided.

Rates for OHSRs/ELSRs including fixtures with a staging of 10 m without Seismic analysis.
Up to 10,000 Litres capacity
15,000 Litres capacity
20,000 Litres capacity
40,000 Litres capacity
60,000 Litres capacity
1,00,000 Litres capacity
2,00,000 Litres capacity
3,00,000 Litres capacity
4,00,000 Litres capacity
4,50,000 Litres capacity
NOTE:-1) For intermediate ranges proportional rates may be adopted.All VRCC shall be in M30 grade
design mix.
2)The above rates are applicable for Elevated Level Services Reservoirs / OHSRs with RAFT
FOUNDATION and a rate of Rs.4,000/- per tonne for cement and Rs.46,500/- per tonne for steel.
3) For every metre of staging less than 10 m, the rate shall be reduced by Rs.0.05 paise per litre per
every metre of difference in staging
4) For every metre of staging above 10 m , the rate shall be increase by Rs.0.10 paise per litre per every
metre of additional in staging
5) The above rates shall be increased / decreased due to increase / decrease in the cost of cement by
Basic Rate x (Rc-4000) x 0.00007
Rc = Rate of cement (Rs per Mt) at the time of preparation of estimate
6)The above rates shall be increased / decreased due to increase / decrease in the cost of steel by
Basic Rate x (RS-46500) x 0.00002
Rs = Rate of steel (Rs per Mt) at the time of preparation of estimate.
7) Rate inclisive of three coates of epoxy paint to inner surface of the reservoir including roof dome.
8) The above rates be adopted for estimate purposes for construction of ELSR for a finished work
including 2 coats of wheather proof emulsion painting for external surfaces, lettering, all required fixtures,
pipes, bends, valves etc., for pipe connections but excluding cost of pipes,bends and valves as per
departmental designs and drawings.
9) The above rates are applicable for wind pressures upto 350 kg / sq m .For decrease in wind presure
the rate has to be decreased by 5% per every 100kg/sqm. If the ELSR / OHSR is to be designed for
seismic forces also, cost shall be arrived by working out detailed quantities based on the designs.
10) For Tribal/Agency/ Rural area, the above rates shall be increased by 10%

11) If the ELSR is to be designed for seismic forces also, cost shall be arrived by working out detailed
quanitites based on the design & difference to be paid extra.
12) If the ELSR is to be designed for seismic forces a) The above rates are applied upto Zone-II earth
quake. b) for Zone-III earth quake the above rates are to be increased by 33.33 % .
13) Fixtures include :
a) RCC or Aluminium ladder inside 0.60 m wide.
b) spiral staircase on the outside shall be provided upto 200KL ELSR. Above 200KL ELSR Capacity dog
legged staircase shall be provided with staircase flight width of 1.0mts and landing width of 1.20mts with
S.S railing upto 1.0 height.
c) Lightening arrestor, including conductor and earthing etc.
d) RCC ventilators with copper or stainless steel fly proof mesh.
e) D.I Manholes frame and cover 0.60x0.60 m as per IS specifications (light duty) - 2 Nos.
f) Water level indicator of good quality with ebonite/ copper float approved pattern - 1 No.
g) The ladder shall be with M.S ladder and Verticals with HDPE of 10kg/Sqcm shall be provided for single
column OHSRs only.
h) Minimum staging for all ELSR/OHSR shall be 10.0mts.
i) The increase in staging shall be at 1.0mt interval.
j)The railing provided to the gallery and stair case shall be with stainless steel of grade 304 for a height of
1.20mts.
k). The dog legged staircase shall be enclosed with brick/CRS wall on three sides and front side with M.S
collapsible gate upto 1st brace level from ground level to prevent unauthorized entry.
l). D.I swan neck ventilators shall be provided in top dome and slab.
m). The above rates are exclusive of all inlet, out let conenction and valves. All valves near inlet, out let
and for scour of ELSRs shall be D.I valves.
Construction of Rapid Gravity Filtration Plant including civil, mechanical and electrical
fully automation including trial running etc., complete.
1) 2.0 Mld
2) 5.0 Mld
3) 10.0 Mld
4) 20.0 Mld
5) 30.00 Mld and above
NOTE :a) For intermediate ranges proportional rates may be adopted
b) The above rates are applicable with cement @ rate of Rs.4,000/-MT and steel of Rs. 46,500/MT.
c)The above rates shall be increased / decreased due to increase / decrease in the cost of cement by
Basic Rate x (Rc-4000) x 0.00007
Rc = Rate of cement (Rs per Mt) at the time of preparation of estimate
d)The above rates shall be increased / decreased due to increase / decrease in the cost of steel by Basic
Rate x (RS-46500) x 0.00002
Rs = Rate of steel (Rs per Mt) at the time of preparation of estimate.
e) For rural areas an extra allowance of 10% shall be given on basic rate.

The components of the Filtration Plant are as follows.


A) Civil Works: (All works of VRCC Shall be in M30 design mix)

1). Stilling Chamber and Areation cascade


2). Raw water channel with Stainless Steel Weir of SS304L Grade material and also with digital flow
meters
3) Flash Mixer chamber with Flash mixing arrangements including SS shaft & SS Blades with gear wheel
arrangements etc, Using 304L Grade Steel.
4) Clariflucculator / Flocculation tanks with the components of central driven circular clarifier with scrapper
& bridge arrangements made with Stainless Steel Grade 304 L tubes /angulars for durability & chemical
resistant with wheel arrangements etc,.
5) Filter house, Chemical house, Alum store, Laboratory room , Chlorination plant room, toilet etc. (All
structures shall be provided RCC roof only).Chemical house & Chlorinator rooms are to be isolated.
6) Wash water tank of suitable capacity shall be constructed at minimum clearance of 2.00m, above the
roof slab of Filter beds / any other structure.
7) All the Doors and Windows shall be of Best Teak wood/Aluminium / UPVC make, except entrance
door. The entrance door including shutter in filter house shall be with best teak wood of size of 2.40 X
2.40 mts.
a) Main Doors of the individual Buidings shall be made of Best Teak wood
b) Other Internal Doors of the buildings shall be of Compreesed wood/ Aluminium/ UPVC materials.
c) Ventilators shall be provided for each building/structure of suitable size as per NBC statndards.

8) All pipes and valves in Plant shall be of D.I. materials. All the Connecting pipes of the plant coponents
such as from Flash mixer to Clarifloculator/ Clarifier/Flocculation tank, to Filter beds, sludge disposal
pipes shall be of D.I. material. The size of sludge disposal pipe shall be minimum of 450 mm dia with D.I
D/F pipe.
9) The Pipe gallery way for Clear water/ Back wash water/ pipe connections shall be suffuiciently spaced
for easy operation & maintenance and inspection .
10) The bottom level of the wash water control chamber must be above G.L so as to dispose the wash
water and sludge from Clariflocculator by gravity to disposal point.
Additional specificaions
11) Railing for all the components (Clarifloculator, Filter House, Staircase etc,.) shall be provided with
Stainless Steel of grade 304 for a height of 1.00m, with 40mm dia pipe for top horizotals,25mm dia for
middle row and 40mm dia verticals spaced at interval of not more than 1.00m c/c.
12) Inspection / Path ways in filter beds : Middle pathway: Minimum of 1.50m,Side pathway: Minimum of
1.20m.
13) Flooring in the buildings (Filter house, Chemical House, Chlorinator Room, Laboratory) shall be
provided with Non-skid tiles of approved make & quality , as per standard specifications.
14) The basement of the Filtration plant building shall be minimum of 1.20m above the existing nearby
Road top level.
15) Minimum head room of 2.00m shall be provided , at the alum mixing chambers in alum store for
inspection & maintenance
16) The minimum width of entrance hall for the Filter House shall be 4.50m , and Laboratory, of min
size .of 3.30 X 4.50m .
17) High efficient Air Blowers shall be installed to the design requirement with low noise pollution ,
environmental pollution as per PCB guide lines & Testing of blowers as per I.S norms at site.
18) UPVC pipes shall be provided for water drain.Filter pipe manifolds shall be assembled with HDPE
pipes.

19) Alum storage capacity shall be designed for minimum period of 90 days. Consumables shall be
provided for 2115 Running Hours of WTP.
20) Chlorinator : Vaccum type chlorinator shall be provided with following specifications:
a) Vaccum operated solution feeding type Vaccum Regulator, Rotometer, Rate setting Valve, built-in NRV,
Gas Overflow out let by manifolding to mount the system with the unit.
b) The unit shall consists of Ejector with necessary accessories such as Check Valve, Drain Valve and
Vacum relief Valves - for control of chlorinator dosage.
c) The Accessories and manifolds shall be chlorine resistant and made of corbon steel seam less pipes,
copper tube with brass fittings of suitable size & dimensions, with diaphram sealed chlorine pressure
gauge arrangements

d) Water Boosted Pump of pumping capacity ranging from 2 cum/hr to 12 cum/hr, with Head ranging from
16 to 35 MWC
e) The water & solution carrying pipes shall be made of UPVC material of suitable size incl.all specials
such as Tee's , Bends, couplings & NRVs and also Pressure Gauges of suitable range.
f) Chlorine Gas detector with alarm indicator.
The installation includes all necessary accssories, civil and mechanical works,manifold header
installations, injector fixing, connection with UPVC pipes, solution pipings, fixing of motors as per
standard speicfications and commissioning of Cholirnation Plant to the required demand, with a deffect
liability period of 1 year.
The cholrinator of may be of any reupted make or any make of Metito/Toshocow-Jesco/ Industrial
devices.
g) Life breathing operators.
h) Chlorine escape BA Set.

i) 2 to 10 MLD Plants - 1Kg/hr Chlorinator


for Post Chlorination
ii) 10 MLD to 20 MLD Plants - 2 Kg/hr Chlorinator
for Post Chlorination.
iii) 20 MLD to 50 MLD Plants - 5 Kg/hr Chlorinator
for Post Chlorination.
B) Mechanical Equipment
1) Alum dosing equipment with SS 304 material made stirrers & paddles for chemical resistance. (Alam
tanks must be bound with corrosion resistant material (HDPE Lining, Bitumen Coating, tiles etc)
2) Flash mixer equipment with SS 304 material made stirrers & paddles for chemical resistance.
3) Filtration plant euqipment instrumentation and piping.
4) Clarifloccualation equipment (with stainless steel blades) with rotating bridge arrangeemnt etc.,
5) Pneumatic tyre wheel shall be provided for the bridge clariflocculator.
6) Wash water tank fittings and pumpsets with 100% stand by.
7)Air blower with motor 100% stand by and pipe connections made with of SS Pipes Confirming to SS304
Grade, in filter bed region.
8)Spares & Tools for 2 years
9) Gaseous Chlorination with cylinders has to provided with protection measures.
C) Electrical Equipment
1) Necessary power supply wiring to motors and switches bus bar connections as per IE Rules

2) Internal wiring and illumination and fittings and fixtures for internal and external lighting exhaust fans,
ceiling fans etc.
3) Erecting mechanical and electrical equpment, trial run for 90 days 23.50 hours per day ttesting the
treated water for efficient stardards and maintenance of records and imparting training to staff.
4) Supply of 6 - Sets of completion plans and maintenance manual and brochures.
5) All cables shall be with of copper material, Cable ducts shall be covered with MS / Aluminum chequed
plate.
6) Min LUX levels inside the treatment plant shall be maintained.
7) Yard lighting shall be provided as per norms.

D)EquipmentforFlowmeasurements
1) Equipment for Flow of Conductivity, Turbidity, Ph value, Residual Chlorine with recording & data storage
facility (Computer based) & Alarm by SMS or other methods.
2) Off - Site Supervisory and Data Acquisition (OSSADA) system for Raw water & Clear water flows by
installing Digital Flow meters to measure the flows at Raw water Channel and at each filter bed
individually and combined for measuring the quantities of water treated with a facility to record and store
the readings & also to send messages to the assigned designatories about the variations/ defficiencies in
the flow including alerts for back wash requirements of filter beds, and recovery of data for the past 360
days. All the Digital Flow Meters & Pressure Gauges shall be provided of standard approved make. The
equipment shall have the following specifications, but not limited to:

Hardware:
i) Wall mounted Sensor House for measuring Raw water & Clear water flow from Filter bed out lets with
accessories consists of
ii)Electrode Type: General type, Scraper type or replaceable type Electorde made with material of SS
external Ultra Touch Sensors as per requirement.
iii)Customised Application Requirement : Sensors with Interface logic control board with serial interfaces,
including accessories such as Add-on port, external DC Power Socket, On - sensor Board Buffer, Timer,
RS485 Communication, Analog to Digital Sensing Sensor Circuit, 32 Sensors Sensing Tags, Interval
Power Supply System , LCD 16c/2L, Filter Bed Working Status Indication LED, Filter Bed Wash Indication
Button and memory of Data Storage for 30Days , status of Filter Bed Level indicator, Rating, Reading on
LCB Display, Menu Driven Data for sending to Onsite Big Display, operated with Battery Power of any
reputed make or any equalent make.

iv)Customised Application Requirement: Power Sensors Interface logic control board with support 8
Power Sensing tags, Central System Interfacing Communication, On - board analog to Digit Convert
Integrate Circuit of any reputed make or any equalent make.
v)Customised Application Requirement: Centralized System with two serial interfaces, 3 Nos of Add-On
ports, One external DC Power Socket, On - Board Buffer, On - Board Timer, On - Board RS485
Communication, On - Board RS 232 Communication, On - Board GPRS/GSM Module, On - Board Voice
Chip, On - Board Power Sensing Module, LCD 16c/2L, Filter Bed Wash Precaution Indication with Stop
Button, Memory of Data Storage for 30 Days, Total Bed Rating, Reading display on LCD Display, Menu
Driven, Menu Navigate Keypad, sendind data to the Web Server, Communication with GPRS , operated
with Battery Power of any reputed make or any equalent make.

Software:

The software shall be designed with Web Domain with Data Base Server and Web Name as per the
directions of the Departmental Authorities
The application of Software for Web design & Desktop shall meet the following requirements:
Onsite Display: Letters with size of 1.5 seven Sigment LED Display with Interface for each Filter Bed, for
Onsite Display, by displaying the Bed Leves, Ratings, Readings in 3 Columns , for each bed of the plant
in succesive rows and cumulative results at the bottom of the screen.
Off Site Display: Letters with size of 1.5 seven Sigment LED Display with Interface GPRS/GSM Modules
Offsite Display, with Display of Bed Total Rating, Total Cumulative Reading as specified on On-site
Display Features.
The system shall have also the features of Onsite Bed Wash Voice Precautions for Bed Levels,
Readings, Ratings, Bed Capacity Readings and Ratings and Bed Low Level Triggering, before & after
Bed wash.
The software shall also have the features of sending messages to the mobiles of the Departmental
designatories indicating Bed Low Levels,Power Supply timings, Bed Wash timings and its status, Power
Supply timings and its status Grid View Table, Motor Working time and its status Grid View Table, all
trigger events and schedule information and including all Snap View Reports, all Daily, Monthly, Yearly
Reports, all Power Working Reports, all Power Events Information etc,.

Description of Item

RATES OF MATERIALS
(A) STONE AND ROAD MATERIALS
ROUGH STONE QUARRIED INCLUDING WEDGING, BREAKING, BURNING, SPLITING AND
STACKING
For R.R Masonary Work (other than Granite, Dolomite and Trap)
For SS Revetment work 225 mm
For SS Revetment work 300 mm
For SS Revetment work450 mm
Jeddy Stone above 450 mm to 600 mm
Laterite for revetment 225 mm
Laterite for revetment 300 mm
Granite for SS revetment 225 mm
Granite for SS revetment 300 mm
Note:- Only when other granite is not available
Laterite for masonry
Cyclopean stones above 0.2 cum
For R.R.Masonry works ( granite, dolamite and trap variety)
NOTE:- For items 22(a) to 22 and 22(g) add extra Rs

/cum, wherever quarrying is done by blasting

COURSED RUBBLE STONE QUARRYING WEDGING, BREAKING, BURNING AND SPLITTING


INCLUDING STACKING FOR SS FIRST SORT WORKS
Granite, Dolamite and trap
For other varieties
Granite stone slabs for culverts, lintels and copings (3 faces dressed coarsed rubble masonry)
NOTE: - For items 23(a), 23(b) and 27 add extra Rs. Per Cum, wherever quarrying is done by blasting
Bond stones ( 600 x 200 x 200 mm )
Chainage stones and Centre line stones (750x150x150xmm)
Demarcation Stones ( 900 x 150 x 150 mm)
Guard Stones ( 1200 x 200 x 200 mm )
Guide Stones ( 800 x 150 x150 mm )
Carving letters and figures in stone up to 100 mm size
Carving letters and figures in stone above 100 mm size
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE FREE FROM DUST OBTAINED BY
QUARRYING, WEDGING, BREAKING, BURNING AND SPLITTING INCLUDING STACKING.
- do -

6mm

size (SS 5)

- do - 10mm

size (SS 5)

- do -

size (SS 5)

12mm

- do - 20mm

size (SS 5)

- do -

25mm

size (SS 5)

- do -

40mm

size (SS 5)

- do - 50mm

size (SS 5)

- do -

60mm

size (SS 5)

- do - 65mm

size (SS 5)

- do -

size (SS 5)

75mm

- do - 75 to 100mm size (SS 5)


NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if the metal is obtained by blasting
(2) Add 25% extra per cum if the metal is obtained by machine crushing excluding cost of blasting.
(3) Deduct Rs. /- per cum if the metal or rubble is obtained from surface stone and boulders.
(4) Add Rs. /- per cum for selection of stones and boulders from excavated spoil dumps for items 33 a to
33 k, when this addition of Rs. /- per Cum is allowed, deduction of Rs. /- per Cum mentioned under Note
(3) above should invariably be made.
SOFT BROKEN STONE SCREENED AND FREE FROM DUST INCLUDING STACKING
- do -

40 mm size ( SS 5 )

- do -

50 mm size ( SS 5 )

- do -

60 mm size ( SS 5 )

- do -

65 mm size ( SS 5 )

- do -

75 mm size ( SS 5 )

HARD BROKEN STONE OF GRANITE TRAP DOLERITE AND DOLAMITE FREE FROM DUST
OBTAINED BY QUARRYING WEDGING, BREAKING, BURNING AND SPLITTING INCLUDING
STACKING (QUARTZITE AND BASALT WITH AGGREGATE IMPACT OF LESS THAN 20)
-do- 2.36 to 5 mm size (IRC&MORTH)
-do- 5 to 7mm size (IRC&MORTH)
-do- 9.5 to 11.2mm size (IRC&MORTH)
-do- 12mm to 14 mm size ( IRC and MORTH )
-do- 19 mm to 22 mm size ( IRC and MORTH )
-do- 25 mm to 27 mm size ( IRC and MORTH )
-do- 40 mm to 45 mm size ( IRC and MORTH )
-do- 50 mm to 55 mm size ( IRC and MORTH )
-do- 60 mm to 63 mm size ( IRC and MORTH )
-do- 65 mm size ( IRC and MORTH )
-do- 75 mm size ( IRC and MORTH )
NOTE:- Add extra Rs. /- per cum for items 33 (a) to 33 (j) if the metal is obtained by blasting
Add 25% extra per cum if the metal is obtained by machine crushing excluding cost of blasting.
Deduct Rs.

/- per cum if the metal or rubble is obtained from surface stones and boulders

Add Rs. /- per cum for selection of stones and boulders from excavated soil dumps for items 33 (a) to
33 (k), when this addition of Rs. /- per cum allowed deduction of Rs. /- per cum mentioned under note
(3) above should invariably be made
HARD BROKEN STONE OTHER THAN GRANITE SUCH AS QUARTZ, QUARTZ-NAPA AND BASALT
SCREENED AND FREE FROM DUST INCLUDING STACKING
- do -

10 mm size (SS 5)

-do- 9.5 mm to 11.2 mm size ( IRC and MORTH )


- do -

12 mm size (SS 5)

-do- 12mm to 14 mm size ( IRC and MORTH )


- do -

20 mm size (SS 5)

-do- 19 mm to 22 mm size ( IRC and MORTH )

- do -

25 mm size (SS 5)

- do -

40 mm size (SS 5)

-do- 40 mm to 45 mm size ( IRC and MORTH )


- do -

50 mm size (SS 5)

-do- 50 mm to 55 mm size ( IRC and MORTH )


- do -

65 mm size (SS 5)

-do- 60 mm to 65 mm size ( IRC and MORTH )


- do -

75 mm size (SS 5)

- do -

75 mm size ( IRC &MORTH)

- do -

75 to 100 mm size (SS 5)

- do -

75 to 100 mm ( IRC& MORTH)

OTHER ITEMS INCLUDING STACKING


Laterite 40 to 75 mm ( ring)
kankar, hard broken kankar 40 to 75 mm ( ring )
Soling stone of 150 mm size of granite, trap and Dolamite varieties.

NOTE:- (1) Add extra for items to 33(z3) Rs /- Per cum, wherever quarrying is done by blasting. (2)
Wherever controlled blasting is resorted to the Chief Engineer concerned shall approve the observed data
in support of SS item No. 22 a to 22 c , 22g, 23
Soling stone of 150 mm size other than granite variety
Soling Stone laterite, Kankar 150mm, surface stone
Field picked metal unbroken

20 mm size

- do - 25 mm size
- do - 40 mm size
- do - 50 mm size
- do - 60 mm size
- do - 80 mm size

dd Rs. /- Per Cum for selection of stone and boulders from excavated spoil dumps for items 33 (Q) TO 33 Z , when
n of Rs. /- per Cum is allowed, deduction of Rs. /- per Cum should invariably be made towards the metal or
is obtained from surface stone and boulders.
Gravel including stacking
Quarry rubbish
HBG Stone Chips 2.36mm and below
Sand for mortar, ceiling coat including washing screening etc.,
Sand for filling and blindage
Clay for puddle and masonry Items 38 (a) to 39 (h) As per local prevailing rates based on competitive
quotations.
(C) LIME AND CEMENT

Cement excluding cost of empty cement bags for 1 MT

are inclusive of sales tax. 2)As per the rates applicable to the District. 3) Least of the (1) and (2 ) above may be
f cement will be reviewed and fixed on monthly basis and rates will be communicated separately.
Grinding lime mortar or Surkhi mortar
Shell lime slaked and screened
White cement
(D) MORTARS
Items 43 to 45
(E) METAL AND IRON WORKS
Mild steel rods 6mm dia.
Mild steel flats
Mild Steel, Structural Steel, I.e., Angles, Channels and I sections.

High Yield Strength Deformed Bars/TMT bars


Mild steel plates
The rates are inclusive of sales tax. 2) As per the rates applicable to the District.
3) Least of the (1) and (2 ) above may allowe
es of steel will be reviewed and fixed on monthly basis and rates will be communicated separately.

Clearing heavy Jungle


Clearing light Jungle
Clearing Scrub Jungle

Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps.
Cutting and removing Palmyrah trees including stacking of girth 30 to 100 cm.
- do - 100 to 200 cm.
Uprooting and removing Palmyrah stumps including stacking of girth 30 to 100 cm.
- do - 100 to 200 cm.
Cutting and removing date trees including stacking of girth 30 to 100 cm
- do - 100 to 200 cm
Uprooting and removing stumps of date trees including stacking of girth 30 to 100 cm.
- do - 100 to 200 cm
Cutting and removing other kind of trees including stacking of girth 30 to 100 cm
- do - 100 to 200 cm
- do - above 200 cm

Uprooting and removing stumps of other kind of trees including stacking of girth 30 to 100 cm.
- do - 100 to 200 cm
- do - above 200 cm
Uprooting and clearing prickly pear jungle
- do - under 2.5 meters height including burning and burrying as directed.
- do - over 2.5 meters height including burning and burrying with an initital lead of conveyance
Removing of natchu, goobi, thooti etc., from drains, channels including clearance if not more than 1 metre
depth of water with an initial lead of 10 metresand lift of 2 metres.
Clearing alchi, tilla
Removal of Jammu
Removal of imponea, cornea
Removal of water hyacinth upto 30 cm thick.
- do - more than 30 cm thick
Removal of natchu, goobi, thooti etc., for every extra lead or lift over the initial lead or lift.
(B) DISMANTLING
DISMANTLING, CLEARING AWAY AND CAREFULLY STACKING MATERIALS USEFUL FOR REUSE.
Dry rough stone revetment for aprons and stacking within 40 metres
Drilling holes in hard granite or sheet rock
Manually ( Hand)
20 mm dia meter
25 mm dia meter
36 mm dia meter
Pneumatic Compressor
20 mm dia meter
25 mm dia meter
36 mm dia meter
Grouting the holes with neat cement slurry excluding cost of steel
20 mm dia meter
25 mm dia meter
36 mm dia meter
White Washing and Painting works
White washing and colour banding for guard and guide stones including cost of materials
Screening sand and gravel
Screening chips and metal
Removing and refixing Hectometre or Demarcation stones
(S ) ROAD WORK ITEMS
PICKING OLD METALLED SURFACE TO DEPTH OF 40 TO 100 mm SPREADING OLD METAL AND
NEW METAL
( For a compact thickness )
HARD METAL
40 mm thickness
50 mm thickness
75 mm thickness
100 mm thickness
(For compact thickness of soft metal)
50 mm thickness

75 mm thickness
100 mm thickness
Picking old metalled surface to a depth of 40 to 100 mm and spreading metal(for compacted thickness
of )
HARD METAL
40 mm thick ness
50 mm thick ness
75 mm thick ness
100 mm thick ness
150 mm thick excluding hire charges
Gelatin(For MORTH data, for works of state & national high ways only)
Electric Detonators(For MORTH data, for works of state & national high ways only)
Hot applied thermoplastic compound(For MORTH data, for works of state & national high ways only)
Reflectionising glass beads of 2 mm thick(For MORTH data, for works of state & national high ways only)
Road marking paint confirming to IS 164(For MORTH data, for works of state & national high ways only)
Labour charges for laying filters with coarse aggregate.
Labour charges for laying filter with sand.

New Items.
Fly Ash
Binding wire

Jute rope
De bonding strips
Selent
Poly sheet 125 microns
Rural water rate

BUILDING SSR
BRICKS & BUILDING BLOCKS
Common burnt clay bricks Modular or traditional size 23 x 11 x 7 cm
Common burnt clay bricks Modular or traditional size 19 x 9 x 9 cm
Fly ash cement / lime solid blocks with compressive strength of 75 kg/sq.cm - 290 x 225 x 140 mm
Fly ash cement/lime solid blocks 75 kg/sq.cm - 290 x 200 x 140 mm
Fly ash cement/lime solid blocks 75 kg/sq.cm - ) 290 x 150 x 140 mm
Fly ash cement/lime solid blocks 75 kg/sq.cm - 290 x 112/100 x 140 mm
Fly ash cement/lime solid blocks of 75 kg/sq.cm - 225 x 100 x 60 mm
Fly ash cement/lime solid blocks 75 kg/sq.cm - 7.5 145 x 225 x 140 mm
Fly ash cement/lime solid blocks of 75 kg/sq.cm 145 x 200 x 140 mm
Fly ash cement/ lime solid blocks of 50 kg/sq.cm 290 x 225 x 140 mm
Fly ash cement/ lime solid blocks of 50 kg/sq.cm 290 x 200 x 140 mm
Fly ash cement/ lime solid blocks of 50 kg/sq.cm -290 x 150 x 140 mm
Fly ash cement/ lime solid blocks of 50 kg/sq.cm - 290 x 112/100 x 140 mm
Fly ash cement/ lime solid blocks of 50 kg/sq.cm 225 x 100 x 60 mm
Fly ash cement/ lime solid blocks of 50 kg/sq.cm - 145 x 225 x 140 mm
Fly ash cement/ lime solid blocks of 50 kg/sq.cm 145 x 200 x 140 mm
Supply of well burnt cinder aggregates as per IS: 2686-1977
Supply of Aerated (Cellular) Autoclaved Concrete Blocks conforming to IS:2185 (Part-3) - 1984 and
IS:6441-1972 of Compressive strength 3 N/mm2
of Aerocon / Airolite or equivalent products
600 x 200 x 100 mm
Supply of Aerated (Cellular)
Airolite 600 x 200 x 150 mm
Supply

of

Aerated

(Cellular)

Autoclaved
Autoclaved

Concrete
Concrete

Blocks

N/mm2

of Aerocon

Blocks 600 x 200 x 200 mm

Supply of Aerated (Cellular) Autoclaved Concrete Blocks 600 x 200 x 230 mm


NATURAL FLOORING STONES (ex-quarry price - excluding cost of conveyance, loading &
unloading)
Kadapa slab 40 mm thick and size not less than 0.457 M x 0.457 M
Kadapa slab 50 mm thick and size not less than 0.457 M x 0.457 M
Shahabad /Tandur Rough Stone slabs of minimum of 25 mm thick
Shahabad / Tandur Rough Stone slabs of minimum 40 mm thick
Polished Shahabad/ Tandur stone slabs of 15 to 18 mm thick (0.457x0.304) or any other size
Polished

black Kadapa slabs minimum of 15 mm thick 0.457x0.457M)

Polished Bethamcherla pure (marble type) white stone minimum 25 mm thick (0.254M x 0.254M)
Polished Bethamcherla coloured stone minimum 25 mm thick (0.254M x 0.254M)
High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black / premium colours
High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours
High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black

Polished Marble slabs 16 mm to 20 mm (average) thick (size 0.457 M x 0.457 M) / (0.6M x 0.6M)
Polished Marble slabs polished 16 mm to 20 mm (average) thick 0.305 M x 0.305 M
Polished Marble slabs of gang saw cut16 mm to 20 mm (average) thick ( 0.610 M width of any length)
Polished Marble Tiles 8 mm thick of all sizes and varieties
Granite stone tiles 8 mm thick (mirror polished of all shades)

WALL & FLOOR TILES (landing cost - including cost of conveyance, loading & unloading)
Supply of Ceramic floor tiles of notless than 7.3mm thick 1st quality
Supply of Edge Cut - Rectified Ceramic floor tiles of notless than 8 mm thick 1st quality
Supply of decorated white background glazed wall tiles of any size and of 5 to 7 mm thick
Supply of screenprinted, decorated coloured background glazed wall tiles of any size and of 5 to 7 mm
thick
Supply of decorated coloured background glazed wall tiles of any size and of 5 to 7 mm thick
Supply of Ist quality, plain white glazed wall tiles of any size and of 5 to 7 mm thick
Supply of Ist Quality, glazed plain coloured wall tiles of any size and of 5 to 7 mm thick
Supply of precast terrazzo tiles 20 mm thick of medium shades
Supply of precast terrazzo tiles 20 mm thick of dark shades
Supply of coloured precast terrazzo tiles of 20 mm thick
Supply of white/ plain precast terrazzo tiles of 20 mm thick
Supply of grey precast terrazzo tiles of 20 mm thick
Supply of vitrified polished floor tiles of size not less than 900 x 900 x 10 mm thickness regular finish and
normal colours
Supply of vitrified polished floor tiles of size not less than 795 x 795 mm x 8 mm thickness regular finish
and normal colours
Supply of vitrified polished floor tiles of size not less than 598 x 598 mm x 8 mm thickness glossy finish
permium colours
Supply of vitrified polished floor tiles of size not less than 598 x 598 mm x 8 mm thickness regular finish
and normal colours
Supply of vitrified polished floor tiles of size not less than 400 x 400 x7mm thickness normal colours
Supply of glass mosaic tiles 1st quality of size 20x20x4 mm thick
Providing of Vitrified/ Ceramic Tile flooring for required areas using different sizes, approved colour
and make fixing with synthetic/ epoxy adhesive in specified thickness with out joint including all taxes
excluding cost of tiles 600 x 600 mm and above sizes tiles.
Providing of Vitrified/ Ceramic Tile flooring for required areas using different sizes, approved colour
and make fixing with synthetic/ epoxy adhesive in specified thickness with out joint including all taxes
excluding cost of tiles 400 x 400 mm and below size tiles

Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing specified colour
cement based polymer grout mixed with grout admix including all taxes excluding cost of tiles: 600 x
600 mm tiles with 3 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing specified colour
cement based polymer grout mixed with grout admix
including all taxes excluding cost of tiles:600 x
600 mm tiles with 4 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing specified colour
cement based polymer grout mixed with grout admix
including all taxes excluding cost of tiles:400 x
400 mm tiles with 3 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing specified colour
cement based polymer grout mixed with grout admix
including all taxes excluding cost of tiles:400 x
400 mm tiles with 4 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing specified colour
cement based polymer grout mixed with grout admix
including all taxes excluding cost of tiles:300 x
200 mm tiles with 3 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing specified colour
cement based polymer grout mixed with grout admix
including all taxes excluding cost of tiles:300 x
200 mm tiles with 4 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing specified colour
cement based polymer grout mixed with grout admix
including all taxes excluding cost of tiles:300 x
200 mm tiles with 3 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing specified colour
cement based polymer grout mixed with grout admix
including all taxes excluding cost of tiles:300 x
200 mm tiles with 4 mm joints width
Providing Glass Mosaic tiles using specified pattern fixing with grout and approved colour of joint filling
with admix cement grouting including all taxes excluding cost of tiles
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing with specified colour
epoxy grout excluding cost of tiles:600 x 600 mm tiles with 4 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing with specified colour
epoxy grout excluding cost of tiles:400 x 400 mm tiles with 3 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing with specified colour
epoxy grout excluding cost of tiles:400 x 400 mm tiles with 4 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing with specified colour
epoxy grout excluding cost of tiles:300 x 200 mm tiles with 3 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing with specified colour
epoxy grout excluding cost of tiles:300 x 200 mm tiles with 4 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing with specified colour
epoxy grout excluding cost of tiles:300 x 200 mm tiles with 3 mm joints width
Providing tile flooring with synthetic/ epoxy adhesive in specified thick and pointing with specified colour
epoxy grout excluding cost of tiles:300 x 200 mm tiles with 4 mm joints width

Providing Glass Mosaic tiles using specified pattern fixing with epoxy grout and approved colour
joint filling with admix cement grouting including all taxes excluding cost of tiles

of

Providing Glass Mosaic tiles using specified pattern fixing with epoxy grout and approved colour
cement admix grout including all taxes excluding cost of tiles
Supply of design wall tiles of any colour and size other than highlighters and of thickness 8 to 10
mm including all taxes
Supply of design highlighters wall tiles of any colour and size and of thickness 8 to 10 mm including all
taxes
Supply of design highlighters wall tiles of premium / radium colours and of any size and of thickness
8 to 10 mm including all taxes
Supply of plain exterior wall tiles of thickness 20 mm of any size for wall claddings
Supply of exterior design wall tiles of thickness 20 mm of any size for wall claddings
Supply of Plain design floor and wall tiles set with floor tiles of thickness 15 mm and wall tiles of thickness
9 mm
Supply of textured design floor and wall tiles set with floor tiles of thickness 15 mm and wall tiles of
thickness 9 mm
Supply of premium plain design floor and wall tiles set with floor tiles of thickness 15 mm and wall tiles of
thickness 9 mm
Supply of premium textured
tiles of thickness 9 mm

design floor and wall tiles set with floor tiles of thickness 15 mm and wall

Supply of premium plain design highlighter combination floor and wall tiles set with floor tiles of thickness
15 mm and wall tiles of thickness 9 mm but excluding highlighters
Supply of premium plain design highlighter combination floor and wall tiles set with floor tiles of thickness
15 mm and wall tiles of thickness 9 mm but including highlighters
Vitrified polished floor tiles of size not less than 1000 x 1000 x 10 mm thickness high glossy finish/
premium colours
Vitrified polished floor tiles of size not less than 795 x 795 mm x 8 mm thickness high glossy finish/
premium colours special series
Vitrified polished floor tiles of size not less than 598 x 598 mm x 8 mm thickness glossy finish permium
colours high glossy finish/ premium colours special series
Vitrified polished floor tiles of size not less than 900 x 900 mm x 10 mm thickness glossy finish permium
colours high glossy finish/ premium colours special series

PAVING & INTERLOCKING TILES (landing cost - including cost of conveyance, loading &
unloading)
Chequered Terrazzo tiles of 22 mm thick (Medium shade) 0.254 M x 0.406 M
Chequered Terrazzo tiles of 22 mm thick (Dark shade) 0.254 M x 0.406 M
Chequered Terrazzo tiles of 30 mm thick ( Light shade) 0.305 M x 0.305 M
Chequered Terrazzo tiles of 30 mm thick (Dark shade) 0.305 M x 0.305 M
Chequered Terrazzo tiles of 30 mm thick ( medium shade) 0.305 M x 0.305 M
Supply, laying & fixing of 60 mm thick cement Mosaic reflective concrete pavers of grade M-40 and
above including labour charges, loading & unloading, laying to desired lines and levels complete
excluding cost of cement, sand, water, electricity etc
Supply, laying & fixing of 30 mm thick cement Mosaic reflective concrete pavers of grade M-40 and
above including labour charges, loading & unloading, laying to desired lines and levels complete
excluding cost of cement, sand, water, electricity etc
Supply of high strength Cement Concrete Designer Tiles of 30 mm thickness of M- 40 Grade of which top
12 mm thick shall be for colour pigmentation with imported colours and white cement to get required
reflective glazing inclusive of all taxes
Supply of high strength Cement Concrete interlocking Designer Pavers of 60 mm thickness of M- 40
Grade of which top 12 mm thick shall be for colour pigmentation with imported colours and white cement
to get required reflective glazing inclusive of all taxes
Supply of high strength Cement Concrete interlocking Designer Pavers of 80 mm thickness of M- 40
Grade of which top 12 mm thick shall be for colour pigmentation with imported colours and white cement
to get required reflective glazing inclusive of all taxes
Supply of high strength Cement Concrete interlocking Regular Pavers of 60 mm thickness of M- 40
Grade of which top 12 mm thick shall be for colour pigmentation with imported colours and white cement
to get required reflective glazing inclusive of all taxes
Supply of high strength Cement Concrete interlocking Regular Pavers of 80 mm thickness of M- 40
Grade of which top 12 mm thick shall be for colour pigmentation with imported colours and white cement
to get required reflective glazing inclusive of all taxes
Supply of high strength Cement Concrete pre-polished ready to lay floor tiles of any colour, design and
any size with 22 mm thickness including all taxes with compressive strength not less than 450 Kg/cm
conforming to IS 516
Supply of high strength Cement Concrete Step tiles of regular colour, design and of 25 mm thickness
including all taxes
Supply of high strength Cement Concrete pre-polished Step tiles of any premium colour, design and of 25
mm thickness including all taxes
Supply of Cement Concrete interlocking Pavers of 60 mm thickness and dumbell, zig-zag, I-block shapes
etc., inclusive of all taxes
Supply of Cement Concrete interlocking Pavers of 80 mm thickness and dumbell, zig-zag, I-block shapes
etc., inclusive of all taxes
Supply of Cement Concrete interlocking Pavers of 100 mm thickness and dumbell, zig-zag, I-block
shapes etc., inclusive of all taxes

TIMBER & ROOFING MATERIALS (landing cost - including cost of conveyance, loading &
unloading)
Note: Before proposing the Teak Wood Items, the estimating authorities shall obtain prior approval
from the competent authority

Medium Teak Wood scantlings: up to 2.0 M


Medium Teak Wood scantlings: 2.0 to 3.0 M
Medium Teak Wood scantlings: above 3.0 M
Medium Teak Wood Plancks: any thickness
Best Teak Wood scantlings: up to 2.0 M
Best Teak Wood scantlings: 2.0 to 3.0 M
Best Teak Wood scantlings: above 3.0 M
Best Teak Wood Plancks: any thickness
Burma Teak Wood scantlings: up to 2.0 M
Burma Teak Wood scantlings: 2.0 to 3.0 M
Burma Teak Wood scantlings: above 3.0 M
Burma Teak Wood Plancks: any thickness
Assam Teak Wood scantlings: any length
Assam Teak Wood Plancks: any thickness
Sal Wood scantlings: any length
Sal Wood Plancks: any thickness
A.C sheet Corrugated 6 mm thick
A.C sheet plain 4 m thick
A.C sheet plain 6 m thick
Plain or Corrugated Galvanized iron sheets as per IS 277 (0.1 mm to 0.8 mm thickness)
MILD, GALVANIZED & STAINLESS STEEL (landing cost - including cost of conveyance, loading &
unloading)
MS. Hallow door frames manufactured by cold roll formed process steel sheet 1.25mm thick bright CRCA
conforming to IS 4351 - 1976 with Hinges tower Bolts etc.
Country Nails
Wire Nails
Mild Steel Tubes & pipes of all diameters as per IS-1161
Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & diameters - 202 Grade
Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & diameters for - 304 Grade
Supplying Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type A Supplying Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type B Expanded metal sheets as per IS-412-1962- Light Weight-25 mm (SWM) x 75 mm (LWM) 3.25 mm
Wide and 1.25 mm thick
Expanded metal sheets as per IS-412-1962- Light Weight-20 mm(SWM)x60 mm(LWM) 2.50 mm
Wide and 1.25 mm thick
Expanded metal sheets as per IS-412-1962- Light Weight-20 mm(SWM)x50 mm(LWM) 2.50 mm
Wide and 1.25 mm thick
Expanded metal sheets as per IS-412-1962- Medium Weight-25 mm(SWM)x75 mm(LWM) 3.25 mm
Wide and 1.60 mm thick
Expanded metal sheets as per IS-412-1962- Medium Weight-20 mm(SWM)x60 mm(LWM) 2.50 mm
Wide and 1.60 mm thick
Expanded metal sheets as per IS-412-1962- Medium Weight-20 mm(SWM)x50 mm(LWM) 2.50 mm
Wide and 1.60 mm thick
Expanded metal sheets as per IS-412-1962- Heavy Weight-25 mm(SWM)x75 mm(LWM) 3.25 mm
Wide and 2.24 mm thick

Expanded metal sheets as per IS-412-1962- Heavy Weight-20 mm(SWM)x60 mm(LWM) 2.50 mm
Wide and 2.24 mm thick
Expanded metal sheets as per IS-412-1962- Heavy Weight-20 mm(SWM)x50 mm(LWM) 2.50 mm
Wide and 2.24 mm thick
Galvanized Iron fly proof wire mesh of not less than 20 gauge
Stainless steel fly proof wire mesh of not less than 20 gauge
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50
mm) - 8 Gauge
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (63 mm
x 63 mm) - 8 Gauge
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 3"x3" (76 mm x 76
mm) - 8 Gauge
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 4"x4" (102 mm x
102 mm) - 8 Gauge
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC Coated 2"x2" (50 mm x 50 mm) - 8 Gauge
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC Coated 2"x2" (63 mm x 63 mm) - 8 Gauge
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC Coated 3"x3" (76 mm x 76 mm) - 8 Gauge
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC Coated 4"x4" (102 mm x 102 mm) - 8 Gauge
Rabbit wire mesh (chicken mesh) of not less than 30 gauge
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together
through their entire length and jointed together at the ends by end-locks, mounted on specially designed
pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers,
bottom locking plates and arrangements for inside & outside locking with push-pull operations including
cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball
bearings, all accessories etc complete for finished item of work as per special spn: 1108

Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm
centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical
frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with
65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking
arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved
steel primer etc., complete for finished item of work as per special spn 1105

Powder Coated Mild Steel Hallow single rebate door frames manufactured using cold roll formed
process steel sheet of 1.25 mm thick bright (Cold Rolled Close Annealed (CRCA) and profile
size of 105 x 60 mm conforming to IS 4351 - 2003 including pre-treatment, Galvanized as
per IS:277, zinc phosphating finished with Thermosetting Polyurethane paint of Aliphatic
Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for
powder coating paint thickness 60 65 microns(Dry film thickness)Stainless Steel Ball Bearing
Butt Hinges 3 mm thick fixed flush to the frame with Hinges, Base Ties, Holdfast Lugs, Mortar
Guards, shock absorbers and provision for Tower Bolts, Aldrops, Lock & Strike plates etc. for both
single and double shutter doors

Supply and Fixing Door Frames made of Skin pass galvanized Iron Sheet ( conform to Base
Steel as per IS 513 D Quality, Galvanized as per IS 277 with Hot Zinc Coating of 120 grams/
Sq.mtr) with pure polyester powder coating of 60 - 65 Microns (Dry Film thickness) manufactured
from 1.2 mm thick galvanized steel sheet formed to single rebate profile of size 100 mm x
58 mm fitted with TEE anchors and supplied to knock down /welded form with Miter Joint for
Bolted Assembly at site, cleaned and coated with Polyurethane powder coating of thickness 65 75
microns (Dry Film Thickness) & Oven Baked at 200 Degree Centigrade for Wood Grain finish, Stainless
Steel Ball Bearing Butt Hinges of 102 x 76 x 3mm thick fixed flush to the frame

Supply and Fixing Door Frames made of Skin pass galvanized Iron Sheet ( conform to Base
Steel as per IS 513 D Quality, Galvanized as per IS 277 with Hot Zinc Coating of 120 grams/
Sq.mtr) with pure polyester powder coating of 60 - 65 Microns (Dry Film thickness) manufactured
from 1.2 mm thick galvanized steel sheet formed to double rebate profile of size 148 mm x
58 mm fitted with TEE anchors and supplied to knock down /welded form with Miter Joint for
Bolted Assembly at site, cleaned and coated with Polyurethane powder coating of thickness 65 75
microns (Dry Film Thickness) & Oven Baked at 200 Degree Centigrade for Wood Grain finish, Stainless
Steel Ball Bearing Butt Hinges of 102 x 76 x 3mm thick fixed flush to the frame

FIXTURES FOR DOORS & WINDOWS


Brass Tower Bolt-10 mm Bolt (IS:204) 100 mm Long
Brass Tower Bolt-10 mm Bolt (IS:204) 150 mm Long
Brass Tower Bolt-10 mm Bolt (IS:204) 200 mm Long
Brass Tower Bolt-10 mm Bolt (IS:204) 250 mm Long
Brass Tower Bolt-10 mm Bolt (IS:204) 300 mm Long
Aluminium Tower Bolt-10 mm Bolt (IS:204) 75 mm Long
Aluminium Tower Bolt-10 mm Bolt (IS:204) 100 mm Long
Aluminium Tower Bolt-10 mm Bolt (IS:204) 150 mm Long
Aluminium Tower Bolt-10 mm Bolt (IS:204) 200 mm Long
Aluminium Tower Bolt-10 mm Bolt (IS:204) 250 mm Long
Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm Long
Aluminium Tower Bolt-10 mm Bolt (IS:204) 350 mm Long
Aluminium Tower Bolt-10 mm Bolt (IS:204) 450 mm Long
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 100 mm Long
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 150 mm Long
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 200 mm Long
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 250 mm Long
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long
Brass Butt hinges (IS:205)- 75 mm Long
Brass Butt hinges (IS:205)- 100 mm Long
Brass Butt hinges (IS:205)- 125 mm Long
Brass Butt hinges (IS:205)- 150 mm Long
Aluminium Butt hinges (IS:205)- 75 mm Long
Aluminium Butt hinges (IS:205)- 100 mm Long
Aluminium Butt hinges (IS:205)- 125 mm Long
Aluminium Butt hinges (IS:205)- 150 mm Long
MS-Powder Coated Butt hinges (IS:205)- 75 mm Long
MS-Powder Coated Butt hinges (IS:205)- 100 mm Long

MS-Powder Coated Butt hinges (IS:205)- 125 mm Long


MS-Powder Coated Butt hinges (IS:205)- 150 mm Long
Aluminium Door Handles (IS:208) 75 mm Long
Aluminium Door Handles (IS:208) 100 mm Long
Aluminium Door Handles (IS:208) 125 mm Long
Aluminium Door Handles (IS:208) 150 mm Long
MS-Powder Coated Door Handles (IS:208) 125 mm Long
MS-Powder Coated Door Handles (IS:208) 150 mm Long
Brass Aldrop (IS:2681) 300 mm long
Brass Aldrop (IS:2681) 350 mm long
Brass Aldrop (IS:2681) 450 mm long
Aluminium Aldrop (IS:2681) 200 mm long
Aluminium Aldrop (IS:2681) 250 mm long
Aluminium Aldrop (IS:2681) 300 mm long
MS-Powder Coated Aldrop (IS:2681) 200 mm long
MS-Powder Coated Aldrop (IS:2681) 250 mm long
MS-Powder Coated Aldrop (IS:2681) 300 mm long
Brass Door Stoppers
Brass Windows Stay
Aluminium Flat Latches: 200 mm long
Aluminium Flat Latches: 250 mm long
Aluminium Flat Latches: 300 mm long
MS-Powder Coated Flat Latches: 250 mm long
MS-Powder Coated Flat Latches: 300 mm long
MS-Powder Coated - Door Stoppers
Supply & fixing drapery rods (25.4 mm) 1" x 21 G Powder coated with PVC rings
Supply & fixing drapery bracket - brass powder coated
Deluxe window stay Aluminium
Heavy duty Aluminium Door stopper
Brass fancy handles 150 mm
Brass fancy handles 200 mm
Brass fancy handles 250 mm
Brass fancy handles 300 mm
Brass fancy handles 450 mm
Providing and fixing Cast Iron Body Bottle Type Hydraulic Door Closer (IS: 3564) with double speed
adjustment, with necessary accessories and screws etc. complete
Double action Stainless steel cover plate and cast body iron floor spring (IS 6315- Table-1)
Double action Brass cover plate and cast brass body floor spring (IS 6315- Table-1)
Heavy duty mortise lock 6/7 levers (IS:2209) with PC or CP handles complete set
Heavy duty mortise lock 6/7 levers (IS:2209) with brass heavy handles
Brass latch heavy 300 mm
Brass latch heavy 350 mm
Brass latch heavy 450 mm
Friction stay hinges for windows
Keyless lockset for toilet doors with CP or PC knob handles (complete set)
Keyless lock set for toilet doors with brass knob handles

Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door Closer (IS: 3564)
with double speed adjustment with necessary accessories and screws etc. complete (Type-1: for width of
doors up to 700 mm)
Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door Closer (IS: 3564)
with double speed adjustment with necessary accessories and screws etc. complete (Type-2: for width of
doors 701 to 850 mm)
Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door Closer (IS: 3564)
with double speed adjustment with necessary accessories and screws etc. complete (Type-3: for width of
doors 851 to 1000 mm)
Providing and fixing double action brass cast hydraulic floor spring (IS:6315-Table 1) for doors including
cost of cutting floors as required, embedding in floors and S.S./ Brass cover plates with brass pivot and
single piece M.S. Sheet outer box with slide plate etc. complete (door weight capacity up to 130 kgs)
Providing and fixing double action brass cast hydraulic floor spring (IS:6315-Table 1) for doors including
cost of cutting floors as required, embedding in floors and S.S.cover plates with brass pivot and single
piece M.S. Sheet outer box with slide plate etc. complete (door weight capacity up to 80 kgs)
Providing of brass cast body Floor Spring IS: 6315 sleek in size with the S.S. / Brass Cover plates of
Length 320 mm x Breadth 130 mm size along with the Top Patch, Bottom Patch, Door Lock and Pivot
with Double Cylinder etc. complete for Heavy duty Glass doors.

WATER PROOFING CHEMICALS & ADMIXTURES


Literature for usage / application of construction / water proofing materials, epoxies etc, may be
obtained from manufacturers.
Supply of cement based Impervious Water Proofing powder compound
Providing Tar felting roof repairs with Zori-felt BT or equivalent duly applying one coat of appropriate grade
of bitumen in hot condition @ 1.2 Kg/1Sqm of roof area, fixing tar felt (Manufactures to IS 1322/1972
specification), applying second coat of appropriate grade of hot bitumen at 1.20 Kg/1Sqm of roof area and
spreading course aggregate (sand) at 0.063 cum per 1 Sqm of roof area finished item
Providing waterproofing treatment by supplying and applying ROOFSHIELD-1500 OR ZORISHIELD1500 equivalent (1.50 mm thickness, 2.25Kg per Sq. Mt and 20 X1 Mtr. roll with a centre core of 90
micron thickness HMHDPE film) Water Proofing Membrane. A) apply one coat of Bituminous Emulsion,
first coat of bituminous grade 85/25, fix "ROOFSHIELD-1500 OR equivalent " water proofing
membrane, apply second coat of Bitumen grade 90/15 after sealing all the joints and abutments with a
Gas torch and apply one coat of BITUMINOUS ALUMINIUM PAINT for heat resistance for finished item

Providing chemical waterproof treatment with Brick bat coba & chemical cement mortars to exposed
RCC roof slab surfaces to required slopes mixed with Zoriproof (100 mL Per Bag of 50 Kgs Cement)
waterproofing chemical compound, laid over roof slab and brickbat coba treatment in chemical
cement mortar 100 mm thick at the centre and 80 mm thick at the edges finished smooth with a
floating coat of chemical mixed cement mortar as per the manufacturer specification including cost
and conveyance of all materials like sand, chemical Zoriproof (100 mL Per Bag of 50 Kgs Cement)
waterproofing compound, water etc., to
site, including seigniorage charges and operational,
incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth curing including
rounding off junctions of wall and slab etc., complete for finished item of work (with a guarantee of 10
years)

Providing chemical waterproof treatment with Brick bat coba & chemical cement mortars to exposed
RCC roof slab surfaces to required slopes mixed with Zoriproof (100 ML Per Bag of 50 Kgs Cement)
waterproofing chemical compound, laid over roof slab and brickbat coba treatment in chemical
cement mortar 80 mm thick at the centre and 60 mm thick at the edges finished smooth with a floating
coat of chemical mixed cement mortar as per the manufacturer specification including cost and
conveyance of all materials like sand, chemical Zoriproof (100 mL Per Bag of 50 Kgs Cement)
waterproofing compound, water etc., to
site, including seigniorage charges and operational,
incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth curing including
rounding off junctions of wall and slab etc., complete for finished item of work (with a guarantee of 10
years)

Construction Chemicals, Epoxy & Admixtures - Chloride free water reducing


and plasticizing
admixture : Conflow SNP1 Zoriplast (Dosage : 20 ml Per Bag of 50 Kgs Cement) or equivalent
High strength Acrylic blended platicizer and Water reducing agent - Conflow SNP20 or Zoriplast
HS (Dosage : 400 ml to 500 ml Per Bag of 50 Kgs Cement)
Quick setting, rapid hardening and water proofing compound - : Conflow SNPA or ZorirapidR or
Equivalent (Dosage : 1 to 3 Ltrs per bag of 50 Kgs Cement depending on the setting time required).
Chloride free super plasticizer for high range water reducing admixture : Conflow SNS I or Zoriplast
SP 350 (Dosage: 200 ml to 500 ml per bag of 50 Kgs Cement) or equivalent.
Chloride free super plasticizer for high early strength and high range water reducing admixture :
Conflow SNS 2 or Zoriplast SP 450 (Dosage: 300 ml to 400 ml per bag of 50 Kgs Cement) or
equivalent.
Set accelerator and plasticizer: Conflow SNA or Zoriset or Equivalent (Dosage:1 Kg to 3 Kgs
per bag of 50 Kgs Cement depending on the setting time required )
Chloride
free High power slump
retaining and
retarding plasticizer: Conflow SNR or Zoriplast
RT5 (Dosage: 15ml to 50 ml per bag of 50 Kgs Cement) or Equivalent.
Air Entraining Agent: Conflow SNE or Zoriplast AEA (Dosage : 15ml to 20 ml per bag of 50 Kgs Cement)
or Equivalent (Dosage : 15ml per Bag of 50 Kgs Cement)
Chloride free super plasticizer, high range water reducing and retarding admixture - Conflow SNS-3
SPL or Zoriplast SPR (Dosage : 300 ml to 400 ml per bag of 50 Kgs Cement) or equivalent
Retarding super plasticizer: Conflow SNS-3
or Accelerating Plasticizers : Zoriplast SRT 5
(Dosage : 500 ml to 1 Ltr per bag of 50 Kgs Cement) or Equivalent.
Waterproof Cement Mortar Plasticizer : Morflow SN 1 or Zoriplast MP ( Dosage :
bag of 50 Kgs Cement) or Equivalent.

100 ml per

Integral Cement Waterproofing Compound : Conflow SNW1 or Zoriproof (Liquid Form) (Dosage : 100
ml Per Bag of 50 Kgs Cement)
Integral Cement Waterproofing Compound :Conflow SNW2 or Zoriproof ( Powder Form) ( Dosage :
500 Grams per bag of 50 Kgs Cement) or Equivalent.
High plasticizing cement waterproofing liquid based on naphthalane formaldehyde : Conflow SNW2 750 Gms or Zorishield 200 or Equivalent. (Dosage:200 ml per Bag of 50 Kgs Cement)

Block Admixture: Conflow SNB or Zoriplast BA (Dosage: 20 ml to 25ml per bag of 50 Kgs Cement) or
Equivalent.
Sprayed Concrete Accelerator: Shotset SN1 or Zoriset
Ltrs/bag of Cement ).

SCA or Equivalent (Dosage : 500 ml 2.5

Surface treatment water Based high power curing compounds: Curaid SN1 or Zoricure WB (Coverage :
5-6 Sq. Mtrs / Ltr / Coat ) or Equivalent.
Concrete wax based pigmented curing compound : Curaid SN2 or Zoricure SB or Equivalent. (Coverage
: 4-5 Sq. Mtrs / Ltr / Coat )
Formwork & Mould Treatment: Shutterol SNU or Zorislip or Equivalent. (Coverage: 1 Ltr Zorislip will
cover approx 20 to 30 m2 on method and material of the form )
Cleaning and acid etching agents: Uniklen SN1 or Zorikleen AC or Equivalent.
Ready to use universal degreasing and cleaning agents: Uniklen SN2 or Zorikleen DA or Equivalent.
Liquid Cleaning Agent: Uniklen SN3 or Zorikleen LC or Equivalent.
Non-shrink Free flow high strength injection grout : Expacrete SN50 or Zorigrout GP 2 or Equivalent.
(Yield 13.5 Ltrs Per 25 Kgs Bag).
Non-shrink Free flow grout: Expacrete SN70 or Zorigrout GP 3
Non-shrink Free flow grout: Expacrete SN90 or Zorigrout GP 4
High strength
cementitious non-shrink
Free flow grout : Expacem SN2 or Zorigrout GP 1 or
Equivalent. (250 Gms per Bag of 50 Kgs Cement).
Low viscosity Epoxy resin
(Density 1.07 Kg Per Ltr )

injection grout (Two parts) :Expacrete SNE 1 or Zorigrout EP or Equivalent.

Epoxy Resin Grouts: Expacrete SNE 3 or Zorigrout EP 3 or Equivalent.


High Power Polyester Resin Anchor Grout: Anchorset SN1 or Zorifix or Equivalent. (Yield 0.5 Ltrs / 1 Kg
Pack )
High strength, high polyester resin grouts Anchorset SN2 or Zorifix XL or Equivalent. ( Yield 0.5
Ltrs / 1 Kg Pack )
Non-metalic Floor Hardeners :
Flortop SNC or Zorifloor DH or Equivalent. ( Coverage : May be
applied at rate 3.5 Kgs /m2 over green concrete for normal traffic & 6-12 Kg / M2 for heavy traffic.
Higher application rates yield better abrasion resistance)
Non oxidizing, heavy duty metallic Floor Hardeners: Flortop SNS or Zorifloor NH or Equivalent.
Epoxy Floor coating: Procoat SNF or Food neutral Epoxy waterproof / damproof coating :
Zoricoat EP or Equivalent. (Coverage : 70 to 80 SFT / Per Ltr / coat)
Polysulphide modified epoxy coatings: Procoat SNS or Zoricoat EPS or Equivalent (Coverage : 250 to
300 Gms / M2 and forms a DFT of 175 to 200 Micron)
Essenputty SNE or Epoxy putty - Zoriputty EP or Equivalent
Zincrich epoxy resin primer - Procoat SNZ or Zoriguard ZP or Equivalent (Coverage : 4-5 Sq.Mtr. /Ltr
/ Coat)
Chemical resistance, fungus resistance water based polyurethane sterile
Zoristerile or Equivalent ( Coverage : 60 to 65 SFT / 2 Coats / Ltr)

coating : Procoat SNL

or

Solvent free chemical resistant Epoxy self leveling (for food and pharmaceutical industry) Flooring
system: Flortop SNSL or Zorifloor SL or Equivalent. ( 8.25 to 0.30 M2 / Kg mix with 2mm thickness )

Self leveling self smoothing water based epoxy floor topping : Flortop SNSL-SPL or ZORIFLOOR SLW
- 1.5- 3mm or Equivalent (Coverage : 4.5m2 / 17 Kg Pack @ 2mm thickness depending on the
substrate)
High build heavy duty epoxy resin floor coating :Flortop SNM or Zorifloor HB or Equivalent. (Coverage :
Base coat 10- 12 m2/ 5 Kg @ 250 microns DFT )
Epoxy based

repair mortar / concrete : Flortop SNFM or Zoricrete EP or Equivalent.

Solvent free Epoxy resin primer for floor coatings : Florcoat SNP or Zoriprime EP or Equivalent.
(Coverage : 3 Kg unit covers about 13m2 for DFT of about 120 micron.)
Solvent free epoxy resin primer for protective coatings Procoat SNC or Zoriprime EPF or Equivalent
(Coverage : 3 Kg unit covers about 13m2 for DFT of about 120 micron.)
Epoxy Primer
Equivalent.

for

floor

coatings

and protective

coatings - Procoat SNP or Zoriprime EFC or

Epoxy primer for Hibond floor & protective coatings : Procoat SNP2 or Zoriprime EFC 2
Cementitious Micro concrete Repair products: Repcrete SNC or Zoricrete MC or Equivalent.
Repair Products:Repcrete SNE1 or Epoxy mortar - Zoricrete EPM or Equivalent
Under water epoxy resin system for repair products : Repcrete SNW or Zoricrete EUW or Equivalent.
Under water epoxy resin system mortar Repcrete SNW Mortar or Zoricrete EMU
Fast setting cement based plugging compound - Uniplug SN or Zoriplug
Form : mix with water direct application )

or

Equivalent

( Powder

High durable cementitious acrylic based two pack Waterproofing systems : Aqua coat SNF or Zoricoat
RX or Equivalent. (12 14 m2 in two coats to achieve 1mm thickness )
Water Repellents: Aquarepel SN1 or Water based
WB or Equivalent
Tile Adhesives: Tilegrip SNU or Zorimix

silicon

water repellent, Nano technology - Zoripel

or Equivalent. (At 3mm thickness 7-9 Sqm / 25 Kgs )

Acrylic based Bonding Adhesives: Conbond SNA or Zoribond PB or Equivalent. (Mix: 1:1 ratio of cement
50 SFT / Ltr /coat depending on the substrate)
Epoxy based Bonding adhesive : Conbond SNE or Zoribond EP or Equivalent. (Coverage : 20 25
SFT / Kg /Coat)
Supply of anti-corrosion admixture inhibitor liquid as per Central Electro Chemical Research
Institute developed specification of Concare brand or Zoriplast AC or Equivalent (200 ml to 500 ml
per Bag of 50 Kgs Cement)
HI-BOND: Concrete Plasticizers: HI-PLAST 01 or Roofbond High plast ( Dosage : 100 ml Per Bag of 50
Kgs Cement)
Concrete Plasticizers: HI-PLAST 02 or Roofbond
Cement)

High plast 2 (Dosage : 200 ml per bag of 50 Kgs

Concrete Plasticizers: HI-PLAST PA or Roofbond AC


Super Plasticizers: HI-PLAST SP or Roofbond SP 30
Super Plasticizers: HI-PLAST SP AR or Roofbond SP 40
Accelerating Plasticizers: HI-PLAST AR or Concrete plasticizing, water reducing and accelerating
admixture - Roofbond PA (Dosage : 500 ml to 1000 ml Per Bag of 50 Kgs Cement) or Equivalent.

Retarding Plasticizers: HI-PLAST RT or Roofbond RT 30


Air Entraining Agents: HI-PLAST A.E or Roofbond AEA
Retarding Super Plasticizers: HI-PLAST SP RT or Roofbond SR 30
HI-PLAST RSP or Roofbond SR 40 or Equivalent.
Mortar Plasticizers: HI-PLAST MP or Roofbond MP ( Dosage : 100 ml Per Bag of 50 Kgs Cement)
Integral Water Proofing compounds: HI-PROOF (L)
or Liquid Concentrated Micronized Cement
Waterproofing Compound : Roofbond 500 (Dosage : 500 ml per bag of 50 Kgs Cement) or Equivalent.
HI-PROOF (P) or Roofbond - P or Equivalent ( Dosage : 1 Kg Per Bag of 50 Kgs Cement).
or Roofbond 750 or Equivalent
Block Admixtures: HI-ADMIX or Roofbond BA or Equivalent ( Dosage : 20 ml Per bag of 50 Kgs
Cement)
Sprayed Concrete Accelerators: HI-ACCEL or Roofbond SA or Equivalent. ( Dosage : 50 Grams
to 1 Kg Per Bag of 50 Kgs Cement)
Surface Treatments curing compounds: HI-CURE 01 or Roofex WB
Surface Treatments curing compounds: HI-CURE 02 or Roofex W X B
Repair Products: HI-CRM or Roofex GP2 or Equivalent
HI-CRM EX or Roofex EC or Equivalent
HI-CRM EXW or Roofex EW or Equivalent.
HI-CRM EX M
or Structural graded
polymer
Zoricrete CMG or Equivalent

modified reinstatement concrete / mortar

Water Proofing: HI-SHIELD or Liquid applied single component, elastomeric waterproofing membrane
coating with -Zoricoat XL or Equivalent. (Coverage : 50 to 60 SFT Per Ltr / Coat ) ( for brush / spray
application add 20% water per Ltr ) As a primer coat application dilute with water @ of 1 : 1 ratio
recommended.
Water Repellents: HI-REPEL or Solvent
Equivalent. (Direct application )

based silicon water repellent compound - Zoripel SB or

Tile Adhesives: HI-ADHESIVE or High strength tile


Equivalent. ( At 3mm thickness 7-9 Sqm / 25 Kgs )

adhesive ( tile on tile) : Zorimix Hi-Grip

or

Leak proofing: Concare-XL Anti-corrosive leak proof admixture or HI-FIX HFA or Styrene Butadine
polymer based waterproof and repair product or Zoribond SBR or Equivalent. (Dosage : 50 to 60 SFT Per
Ltr / Coat mix for repair 10 Ltr / bag of 50 Kgs Cement)
HI-FIX HFE or Epoxy tile mortar - Zorimix EH or Equivalent
HI-BOND Wall Putty Normal
or Grey cement based
(Coverage : 35 to 40 SFT per bag of 40 Kgs Pack)
HI-BOND Wall Putty Fine
Equivalent.

Gypsum Plaster Zoritek GP or Equivalent

or Portland cement based plaster finish surface for interior Zoritek PC or

HI-BOND Wall Putty Super Fine or Acrylic based ready to use surface (white / off white) - Zoritek WC
or Equivalent. (At 1.5 to 2mm thickness 100 - 125 SFT Per Bag of 25 Kgs Pack )
HI-BOND Wall Putty Super Fine (Water Resistant)
Zoritek WP or Equivalent

or Smooth crack free, water resistant finish plaster

POLY-SULPHIDE SEALING COMPOUND: Grade 'A' I.S.I excluding ST or Zoriseal BS Grade A or


Equivalent
Bitumen solution primer of approved quality: Zoriprime BT
Tarfelt Zorifelt BT Type : 2 Grade : 1 or Equivalent

or Equivalent.

Supply and application of Liquid admixture for concrete with high resistance against water ingress and
having surface active agents & refined lignosulphonate Rheomac 707 of BASF
Supply and application of two component acrylic modified cementitious system for forming
coating to waterproof and resurface concrete, masonry and other construction materials waterproof and
flexible coating MASTERSEAL 550 GREY of BASF
Supply and application of Elastomeric flexible two component polymers modified cementitious system
for forming waterproof coating on concrete, masonry & other construction material up to 2mm thick
MS550 EL membrane and reinforced with 100% virgin polypropylene woven fabric MASTERSEAL 550 EL
of BASF
Supply and application of grey cementitious powder polymer additive and cement-based adhesive for
fixing ceramic & vitrified wall and floor tiles, quarry tiles and similar materials MASTERTILE
25 of BASF
Supply and application of premixed, non-metallic, ready to use powder, designed for application as a
dry shake over freshly floated concrete floors or floor screeds to obtain a monolithic floor with enhanced
abrasion resistance MASTERTOP 100 (GREY) of BASF
Supply and application of synthetic polymers to impart rheoplastic qualities to concrete RHEOBUILD 920
(SH) of BASF
Supply of Concare-Plus Admixture Anti Corrosion and leak proof Weather
Hardener
Admixture. Dosage (200 ml to 250 ml per Bag of Cement )

Proof,

Concrete

Supply of Concare-LP polymer based, leak proof, Admixture liquid, dosage (250 ml to 300 ml per Bag of
Cement )
Supply Con- life Water Proof, Leak Proof, Concrete Hardener, Rust Proof, Admixture Liquid Dosage
(200 ml to 250 ml per Bag of Cement )
Supply of Contech 2000 bio Product (Powder) Anti Corrosion leak proof, Crack Proof ,Chemical
Resistant, whether proof, inhibitor liquid. Dosage (5 to 10% of cement weight Cement ) and 15% in
serve environmental
Condition
like marine structures / coastal structures and chemical
structures,Godowns, effect
Supply of Con Cura Self Curing Agent Admixture for Concrete. Dosage (100 ml 250ml per bag (50kgs)
of cement depending on the atmospheric temperature and humidity)
Supply of Con Grout Epoxy Pourable Crack / Gap Filling Grout System. Dosage (Varies with climate,
Site / Substrate Status. Average density is 1.20 Kg / ltr (System)
Supply of Con Mix XL Liquid super Plasticizer And Waterproofing With Anti Corrosive properties.
Dosage (100 Ml 1ltr Per bag (50Kg)of Cement
GLASS
Plain Float Glass 4 mm thick
Plain Float Glass 5 mm thick
Plain Float Glass 6 mm thick
Plain Float Glass 8 mm thick
Plain Float Glass 10 mm thick
Plain Float Glass 12 mm thick
Tinted - Bronze/ Green Glass 4 mm thick
Tinted - Bronze/ Green Glass 5 mm thick

Tinted - Bronze/ Green Glass 6 mm thick


Tinted - Bronze/ Green Glass 8 mm thick
Tinted - Bronze/ Green Glass 10 mm thick
Tinted - Bronze/ Green Glass 12 mm thick
Pin headed Glass 4 mm thick
Pin headed Glass 5 mm thick
Frosted / Ground Glass 4 mm thick
Frosted / Ground Glass 5 mm thick
Toughened Plain Glass 5 mm (including Glass)
Toughened Plain Glass 6 mm (including Glass)
Toughened Plain Glass 8 mm (including Glass)
Toughened Plain Glass 10 mm (including Glass)
Toughened Plain Glass 12 mm (including Glass)

PAINTS & POLISHES


Supply of water based Cement Primer of Interior Grade- 1
Supply of water based Cement Primer of Exterior Grade- 2
Supply of Red Oxide Primer Paint for iron works of Grade -1
Supply of Zinc Chromate Yellow Oxide Primer paint for iron works
Supply of Wood Primer
Supply of Metal paste (Putty) for steel works
Supply of Putty for wood work
Supply of White Lead
Supply of Synthetic clear Varnish
Supply of Spirit
Supply of Linseed Oil
Supply of thinner for melamine polish/ french polish
Supply of thinner for Poly-urethene polish
Supply of French Polish
Supply of ready made Wax Polish
Supply of Melamine Polish
Supply of Interior Grade Poly-Urethene Polish
Supply of Exterior Grade Poly-Urethene Polish
Supply of wood adhesive compound
Supply of Dry Powder Distemper
Supply of acrylic based Oil Bound washable Distemper
Supply of synthetic polymer plastic emulsion paint
Supply of synthetic polymer luxury plastic emulsion paint of
superior grade
Supply of Water proof Cement paint
Supply of acrylic exterior emulsion paint
Supply of water proof Cement paint pack
Supply of paint grade white lime for wash

Supply of anti-corrosive grade - 1 bitumen paint of black colour


Supply of grade-1 aluminium paint
Supply of ready mixed Synthetic Enamel paints in all shades Grade - I
Supply of ready mixed Synthetic Enamel paints in all shades Grade - II
Supplying and finishing Synthetic plaster comprising of Acrylic emulsion binder with sieved fillers,
application performance additives like thickeners, anti cracking and biocides - interior grade
Supplying and finishing Synthetic plaster comprising of Acrylic emulsion binder with sieved fillers,
application performance additives like thickeners, anti cracking and biocides - interior water resistant
grade
Supplying and finishing Synthetic ready mix plaster comprising of Acrylic emulsion binder with bigger size
sieved fillers, application performance additives like thickeners, surface levelling for heavy undulations interior grade
Supplying and finishing Synthetic ready mix plaster comprising of Acrylic emulsion binder with bigger size
sieved fillers, application performance additives like thickeners, surface levelling for medium
undulations - interior grade
Supply & Application of Two Coats of Altek/sai coat/ Neon Super Fine, One Coat of Altek/ sai coat/ Neon
Water Based Cement Primer & Two Coats of Altek Flora/ sai coat/ Neon/Indocem/ PMCC/ ESSAR
super track for internal walls (Emulsion Paint)
Supply & Application of Two Coats of Altek/sai coat/ Neon/Indocem/ PMCC/ ESSAR
Super Fine, One Coat of Altek/sai coat/ Neon Water Based Cement Primer & Two Coats of Delight for
internal walls (Acrylic Washable Distemper)
Supply & Application One Coat of Altek/ sai coat/ Neon/Indocem/ PMCC/ ESSAR Water Based Cement
Primer & Two Coats of Altek Harmony/sai coat/ Neon Espro with fungicides for exterior walls (Emulsion
Paint Exterior Grade).
Supply & Application of One Coat of Altek/sai coat/ Neon/Indocem/ PMCC/ ESSAR Water
Based Cement Primer & Two Coats of Altek Alltimate/sai coat/ Neon weather flex for exterior walls (Acrylic
Emulsion Paint Exterior grade)
Supply of wall putty of White Cement or

Polymer or Cement based

Altek / PMCC or Equivalent top coat high UV resistant exterior paint


Altek / PMCC / Deco orient base or Equivalent exterior Texture.
Altek / PMCC or Equivalent Gold line Exterior Texture
NCL Skim coat 1127/ or PMCC or equivalent white cement based, polymer modified dry mix putty,
specially made to work on levelled, cement sponge finished interior and exterior surfaces. Supply and
application of Two Coats of Cement based putty 1127, inclusive of all taxes for finished item of work
Supply & application of One coat of Altek / PMCC Water base Cement Primer & two coats of top coat high
UV resistant & water resistant exterior paint, inclusive of all taxes for finished item of work
Supply & application of One Coat Water based Cement Primer, One coat of Deco / PMCC Orient Base
Exterior Texture & two coats of Altek Harmony (Emulsion paint exterior grade) inclusive of all taxes for
finished item of work
Supply & application of One coat of Water based Cement Primer, One coat of Gold line Exterior Roller
Finish, inclusive of all taxes for finished item of work
Supply & Application of two coats of Saicoat/PMCC or equivalent suferfine acrylic spray plaster one
coat of Saicoat water base cement primer and two coat of Saicoat Premium Emulsion for interior
walls

Supply & Application of one coat of Saicoat/PMCC or equivalent water base cement primer exterior & two
coat of Saicoat Weatherflex Elastromeric exterior emulsion with antifunges for exterior wall (Emulsion
Paints Exterior Grade)
Saicoat/PMCC or equivalent Wallbond White Cement & Polymer base putty specially made to work
on leveled, cement sponge finished interior and exterior surfaces,Supply and application of two coat of
Saicoat Wallbond putty, one coat of Saicoat water base primer exterior & two coat of Saicoat
Weatherflex elastomeric exterior emulsion, Inclusive of all taxes for finished item of work

Supply and application of one coat of Saicoat or equivalent Re - Ino Texture & two coat Saicoat
Weatherflex elastomeric exterior emulsion, inclusive of all taxes for finished item of work

PARTICLE BOARDS
Plain Particle Board: Interior Grade - 6 mm thick
Plain Particle Board: Interior Grade - 8 mm thick
Plain Particle Board: Interior Grade - 10 mm thick
Plain Particle Board: Interior Grade - 12 mm thick
Plain Particle Board: Interior Grade - 18 mm thick
Plain Particle Board: Interior Grade - 21.4 mm thick
Plain Particle Board: Interior Grade - 25 mm thick
Plain Particle Board: Interior Grade - 35 mm thick
Plain Particle Board: Exterior Grade- 8 mm thick
Plain Particle Board: Exterior Grade-12 mm thick
Plain Particle Board: Exterior Grade-18 mm thick
Plain Particle Board: Exterior Grade-21.4 mm thick
Plain Particle Board: Exterior Grade-25 mm thick
Plain Particle Board: Exterior Grade-35 mm thick
Melamine faced Single Deco PPB- 8 mm thick
Melamine faced Single Deco PPB- 12 mm thick
Melamine faced Single Deco PPB- 18 mm thick
Melamine faced Single Deco PPB- 25 mm thick
Melamine faced Single Deco PPB- 35 mm thick
Melamine faced Twin Deco PPB- 8 mm thick
Melamine faced Twin Deco PPB- 12 mm thick
Melamine faced Twin Deco PPB-18 mm thick
Melamine faced Twin Deco PPB-25 mm thick
Melamine faced Twin Deco PPB-35 mm thick
Natural Colour-Insulating Board - 12 mm thick
Natural Colour-Insulating Board - 18 mm thick
Natural Colour-Insulating Board - 25 mm thick
White Insulating Board - 12 mm thick
White Insulating Board - 18 mm thick
White Insulating Board - 25 mm thick
Extra for veneered particle Board with commercial veneering on both sides.
Extra for veneered particle Board with Veneering on both sides with one side teak veneered and other
side commercial veneered
Extra for veneered particle Board with Teak veneering on both sides
Medium Fibre Board: Interior Grade - 6 mm thick
Medium Fibre Board: Interior Grade - 8 mm thick
Medium Fibre Board: Interior Grade - 12 mm thick
Medium Fibre Board: Interior Grade - 15 mm thick
Medium Fibre Board: Interior Grade - 18 mm thick
Medium Fibre Board: Interior Grade - 25 mm thick
Medium Fibre Board: Interior Grade - 30 mm thick
Medium Fibre Board: Interior Grade - 35 mm thick
Medium Fibre Board: Exterior Grade - 6 mm thick
Medium Fibre Board: Exterior Grade - 8 mm thick
Medium Fibre Board: Exterior Grade - 12 mm thick
Medium Fibre Board: Exterior Grade - 15 mm thick
Medium Fibre Board: Exterior Grade - 18 mm thick

Medium Fibre Board: Exterior Grade - 25 mm thick


Medium Fibre Board: Exterior Grade - 30 mm thick
Medium Fibre Board: Exterior Grade - 35 mm thick
MDF Board: Plain-Interior - 9 mm thick
MDF Board: Plain-Interior - 12 mm thick
MDF Board: Plain-Interior - 18 mm thick
MDF Board: Plain-Interior - 25 mm thick
MDF Board: Plain-Interior - 30 mm thick
MDF Board: Plain-Interior - 35 mm thick
MDF Board: Plain-Exterior - 9 mm thick
MDF Board: Plain-Exterior - 12 mm thick
MDF Board: Plain-Exterior - 18 mm thick
MDF Board: Plain-Exterior - 25 mm thick
MDF Board: Plain-Exterior - 30 mm thick
MDF Board: Plain-Exterior - 35 mm thick
MDF Board: Interior-One Side Laminated -9 mm thick
MDF Board: Interior-One Side Laminated -12 mm thick
MDF Board: Interior-One Side Laminated -18 mm thick
MDF Board: Interior-One Side Laminated -25 mm thick
MDF Board: Interior-One Side Laminated -30 mm thick
MDF Board: Interior-One Side Laminated -35 mm thick
MDF Board: Exterior-One Side Laminated -9 mm thick
MDF Board: Exterior-One Side Laminated -12 mm thick
MDF Board: Exterior-One Side Laminated -18 mm thick
MDF Board: Exterior-One Side Laminated -25 mm thick
MDF Board: Exterior-One Side Laminated -30 mm thick
MDF Board: Exterior-One Side Laminated -35 mm thick
MDF Board: Interior-Both Side Laminated -9 mm thick
MDF Board: Interior-Both Side Laminated -12 mm thick
MDF Board: Interior-Both Side Laminated -18 mm thick
MDF Board: Interior-Both Side Laminated -25 mm thick
MDF Board: Interior-Both Side Laminated -30 mm thick
MDF Board: Interior-Both Side Laminated -35 mm thick
MDF Board: exterior-Both Side Laminated -9 mm thick
MDF Board: exterior-Both Side Laminated -12 mm thick
MDF Board: exterior-Both Side Laminated -18 mm thick
MDF Board: exterior-Both Side Laminated -25 mm thick
MDF Board: exterior-Both Side Laminated -30 mm thick
MDF Board: exterior-Both Side Laminated -35 mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276-6 mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276- 8 mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276- 10 mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276- 12 mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276- 16 mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276- 20 mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276- 25 mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276- 30mm thick
CEMENT BONDED PARICLE BOARD CONFORMING TO IS 14276- 40mm thick
PRE LAMINATEDCEMENT BONDEDPARTICLE BOARD-6 mm thick
PRE LAMINATEDCEMENT BONDEDPARTICLE BOARD-8 mm thick

PRE LAMINATEDCEMENT BONDEDPARTICLE BOARD- 10 mm thick


PRE LAMINATEDCEMENT BONDEDPARTICLE BOARD- 12 mm thick
PRE LAMINATEDCEMENT BONDEDPARTICLE BOARD- 16 mm thick

BISON DESIGNER BOARD Available Designs 1. Lumber 2. Quadra 3.Murk Standard size 8X4 10X46mm thick
BISON DESIGNER BOARD Available Designs 1. Lumber 2. Quadra 3.Murk Standard size 8X4 10X48mm thick
BISON DESIGNER BOARD Available Designs 1. Lumber 2. Quadra 3.Murk Standard size 8X4 10X410mm thick
BISON DESIGNER BOARD Available Designs 1. Lumber 2. Quadra 3.Murk Standard size 8X4 10X412mm thick
BISON DESIGNER BOARD Available Designs 1. Lumber 2. Quadra 3. Murk Standard size 8X4 10X416mm thick
V-Board-Cement Bonded Board - 4mm Thick
V-Board-Cement Bonded Board - 6mm Thick
V-Board-Cement Bonded Board - 8mm Thick
V-Board-Cement Bonded Board - 10mm Thick
V-Board-Cement Bonded Board - 12mm Thick
V-Board-Cement Bonded Board - 14mm Thick
V-Board-Cement Bonded Board - 16mm Thick
V-Board-Cement Bonded Board - 18mm Thick
V-Board-Cement Bonded Board - 20mm Thick
Laminate Sheets - Glossy Finish: 1.00 mm thick
Laminate Sheets - Glossy Finish: 1.50 mm thick
Laminate Sheets - Glossy Finish: 1.80 mm thick
Laminate Sheets - Mat Finish: 1.00 mm thick
Laminate Sheets - Mat Finish: 1.50 mm thick
Laminate Sheets - Mat Finish: 1.80 mm thick
Teak Veneer Lamination - 4 mm thick - Pencil Grains
Teak Veneer Lamination - 4 mm thick - Natural Grains
8 mm thick V-Designer Board
50 mm thick V-PANEL
75 mm thick V-PANEL

PLYWOOD
3 Ply - 4 mm thick Plywood(IS:303) MR Grade
5 Ply - 6 mm thick Plywood(IS:303) MR Grade
5 Ply - 8 mm thick Plywood(IS:303) MR Grade
5 Ply - 9 mm thick Plywood(IS:303) MR Grade
9 Ply - 12 mm thick Plywood(IS:303) MR Grade
9 Ply - 15 mm thick Plywood(IS:303) MR Grade
9 Ply - 18 mm thick Plywood(IS:303) MR Grade
3 Ply - 4 mm thick Plywood(IS:303) BWR/BWP Grade
5 Ply - 6 mm thick Plywood(IS:303) BWR/BWP Grade
5 Ply - 8 mm thick Plywood(IS:303) BWR/BWP Grade
5 Ply - 9 mm thick Plywood(IS:303) BWR/BWP Grade
9 Ply - 12 mm thick Plywood(IS:303) BWR/BWP Grade
9 Ply - 15 mm thick Plywood(IS:303) BWR/BWP Grade
9 Ply - 19 mm thick Plywood(IS:303) BWR/BWP Grade
3 Ply-4 mm thick One side Teak Veneer Decorated Plywood (IS:1328)
5 Ply - 6 mm thick One side Teak Veneer Decorated Plywood (IS:1328)

5 Ply - 9 mm thick One side Teak Veneer Decorated Plywood (IS:1328)


9 Ply - 13 mm thick One side Teak Veneer Decorated Plywood (IS:1328)
5 Ply - 9 mm thick Both sides Teak Veneer Decorated Plywood (IS:1328)
9 Ply - 12 mm thick Both sides Teak Veneer Decorated Plywood (IS:1328)
CEILINGS, WALL PARTITIONS & WALL LININGS
Gypsum Board tiles of size notless than 0.595 M x 0.595 M of 12.5 mm thick as per IS 2095 -1992
Gypsum Board tiles of size notless than 0.595 M x 0.595 M of 9 mm thick as per IS 2095 -1992
Gypsum Board Plain sheet 12.5 mm thick as per IS 2095 -1993
G.I. Ceiling Angle - 25 mm x 10 mm x 0.55 mm
G.I. Ceiling Section 51.5 mm x 26 mm x 10.5 mm x 0.55 mm thick
G.I. Intermediate Section 45 mm x 15 mm x 15 mm x 0.9 mm
G.I. Perimeter Channel - 20 mm x 27 mm x 30 mm (web) of 0.55 mm thick
G.I.-Precoated Fine line Grid 25 mm x 25 mm x 0.7 mm
G.I.-Precoated Fine line Grid 15 mm x 25 mm x 0.7 mm
GI - Precoated - T-Sec- 24 mm x 38 mm x 0.7 mm thick
Hot dipped GI Angle - Precoated - Grid: 19 mm x 19 mm
Polyester painted GI - T Section - 24 x 32 mm
Polyester painted GI - T Section - 24 x 25 mm
Polyester painted GI - T Section - 24 mm x 27 mm
Aluminium Angle : 24 mm x 24 mm
Anodised Aluminium T Section : 24 x 24.5 x 2.4 mm
Connecting Clips
Rawl Plug
6 mm Nylon Rawl Plug
Soffit Cleats
Drywall Screws - 25 mm
Jointing Compound
Jointing Paper Tape
Drywall Top Coat
Universal Holding Clips
4 mm Dia GI Connecting Rod
2 mm Dia GI Connecting Rod
14 mm - Armstrong Mineral Fiber sheet 600 x 600 of beauty-Sky (Board / Tegular) Edge tiles with a
Humidity Resistance of 80% RH, Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity =
0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1
15 mm - Armstrong Mineral Fiber sheet 600 x 600 of fissured-ANF (Board / Tegular) Edge tiles with a
Humidity Resistance of 90% RH, Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity =
0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1
16 mm - Armstrong Tegular Edge 600 x 600 of MINATUFF (Board / Tegular/ Micro look) Edge tiles with a
Humidity Resistance of 99% RH, Average NRC 0.60, Light Reflectance >88%, Thermal Conductivity =
0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1
12 mm - Daiken Mineral Fibre sheet 600 x 600
15 mm - Daiken Mineral Fibre sheet 600 x 600

Perforated wall panels ARMSTRONG channeled wood works sheets of width 128 mm, thickness of 16mm
and length 2440 mm made of a high density particle board substrate with a laminated facing as per the
approved shade/ species & finish and a melamine balancing layer on the reverse side, with a special
perforation pattern Helmholtz fluted perforation on the visible surface with a minimum sag resistance of
RH90 and a fire rating class of 1 as per Part 7 of BS 476 with a tongue-and-grooved edges and the back
of the perforated panel is with sound absorbing non-woven acoustical fleece

Armstrong VARIT PUR Vinyl Flooring Sheet manufactured by Armstrong World Industries, Inc, of size
1.83 m width having a nominal total thickness of 2 mm with a wearing surface impregnated polyurethane
homogeneous mixture of PVC, Plasticizers, Urethane, color pigments, filler calendared, pattern, with
wearing Resistance as per EN 660-2, Fire Resistance of more than 11kW/m2 as per ISO 9329-1 Critical
Radiant Flux, Slip resistance of R9 as per Oil Wet Ramp test (AS 4586)

Vinyl Composition Floor Tiles of size 305 mm x 305 mm having an overall thickness of 2.0mm
manufactured by M/s. Armstrong World Industries, radiant flux greater than 11kW/m2 as per ISO 9329-1
, smoke resistance less than 750% minutes as per ISO 9239.1, electrical resistance of 1010 Ohm
Armstrong Royal LG-1 Vinyl Flooring Sheet manufactured by Armstrong World Industries, Inc, of size
1.83 m width having a nominal total thickness of 2 mm with a wearing surface impregnated polyurethane
homogeneous mixture of PVC, Plasticizers, Urethane, color pigments, filler calendared, pattern, with
wearing Resistance as per EN 660-2, Fire Resistance of more than 11kW/m2 as per ISO 9329-1 Critical
Radiant Flux, Slip resistance of R9
Supply of Thermocole 12 mm thick sheets
Supply of Thermocole 19 mm thick sheets
Supply & fixing 75mm thick metal stud partition using 12.5 mm thick Gypboard conforming to IS 20951982 screw fixed to either side to 48 mm studs of 0.55 mm thick with the 50 mm floor and ceiling channel
0.55 mm and the joints duly finished with joint compound, paper tape and two coats Dry wall top coat as
per specification.
Providing wooden panelling 12 mm thick Novapan one side laminated sheet fixed on wooden frame
of BT wood size 50.8 mm x 25.4 mm (2"x1") at distance of 609.6mm (2'-0") intervals of both ways
providing 3/4" x 1/2" (19.05 mm x 12.7 mm) size BT wood ornamental cover beading and necessary
screws, fevicol glue complete for finished item of work.
Supply , manufacturing , installing of library Rack of 19 mm thick ISI marked commercial ply All round
boxing verticals, Horizontal for depth of 609.6mm (2'-0) and shelves with 3.5 mm thick teak veneer
covered with on exposed surface externally and internally and each panels with 6mm thick ISI commercial
ply with 3.5 mm thick teak veneer for glazed shutters teak wood size 55 mm x 28mm with 5 mm thick
glass fixed with ornamental beading and other ornamental beading is covered as per drawing
including brass hinges, ornamental handles, ball catchers, buffers, locking system etc, and all the
commercial ply exposed edges are to be covered with 6 mm thick teak wood lipping. All the teak veneer
and teak wood and ornamental beading is coated with polishing and a coat of melamine finish etc,
complete for finished item of work.

Calcium Silicate Boards - 6mm thick


Calcium Silicate Boards - 8mm thick
Calcium Silicate Boards - 10mm thick
Calcium Silicate Boards - 12mm thick

Supply and Fixing 66mm thick metal stud partition screw fixed to either side of 48mm studs of 0.55mm
thick with 50mm floor and ceiling channel 0.55mm and the joints duly finished with joining compound,
glass fibre tape and two coats dry wall top coat as per specification finished Item of work- using 8mm
thick Calcium silicate boards
Supply and Fixing 66mm thick metal stud partition screw fixed to either side of 48mm studs of 0.55mm
thick with 50mm floor and ceiling channel 0.55mm and the joints duly finished with joining compound,
glass fibre tape and two coats dry wall top coat as per specification finished Item of work - Using 10mm
thick Calcium silicate boards
Supply and Fixing 66mm thick metal stud partition screw fixed to either side of 48mm studs of 0.55mm
thick with 50mm floor and ceiling channel 0.55mm and the joints duly finished with joining compound,
glass fibre tape and two coats dry wall top coat as per specification finished Item of work - Using 12mm
thick Calcium silicate boards
Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x 27mm x 0.55 thick
and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm thick and fixing and finishing using joint
compound and glass fibre tape complete finish as per specification without painting for finished item of
work: using 8mmthick Calcium silicate boards
Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x 27mm x 0.55 thick
and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm thick and fixing and finishing using joint
compound and glass fibre tape complete finish as per specification without painting for finished item of
work: Using 10mm thick Calcium silicate boards
Supply and fixing of wall lining fixing to GI channels of perimeter channel 30mm x 27mm x 0.55 thick
and ceiling channels of 51.1mm x 26mm x 10.5mm x 0.55mm thick and fixing and finishing using joint
compound and glass fibre tape complete finish as per specification without painting for finished item of
work: Using 12mm thick Calcium silicate boards
Supply and Fixing 66mm thick metal stud partition using 2 layers of 12mm thick Calcium silicate boards
screw fixed to either side to 48mm studs of 0.55mm thick with 50mm floor and ceiling channel
0.55mm.The boards joints are to be staggered to avoid through passage. Ceramic wool of 50mm thick,
64kg/m3 density is to be placed in cavity of the partition. The joints duly finished with joining
compound, glass fibre tape and two coats dry wall top coat as per specification with out painting for
finished item of work

Supplying and fixing of false ceiling using Plaster of paris Boards 12 mm thick with standard GI ceiling
angles, sections perimeter channels including cost and conveyance of all materials and labour
Supplying and fixing of false ceiling using Plaster of paris Boards 10 mm thick with standard GI ceiling
angles, sections perimeter channels including cost and conveyance of all materials and labour charges
etc complete
Designer ceiling Cement Boards -thickness 3.2 mm
High pressure steam cured Cement Boards 4 mm thick
High pressure steam cured Cement Boards 6 mm thick
High pressure steam cured Cement Boards 8 mm thick
High pressure steam cured Cement Boards 10 mm thick
High pressure steam cured Cement Boards 12 mm thick
High pressure steam cured Cement Boards 14 mm thick
High pressure steam cured Cement Boards 16 mm thick
High pressure steam cured Cement Boards 18 mm thick
High pressure steam cured Cement Boards 20 mm thick
High pressure steam cured designer Cement Boards 4 mm thick

High pressure steam cured designer Cement Boards 6 mm thick


Supply and fixing of E-board wall panelling (water, fire and Termite proof) with frame work made of GI stud
profile of size 48 x 40 10 x 0.6 mm thick placed at every 610 mm C/C intervals fixed vertically in between
floor and roof `U track of size 50 x 30 x 0.6 mm thick duly fixed with self expansion screws and with 8 mm
thick E-board / 6 mm thick E-board classic cladded around with self tapping self embedding screws fixed
at every 300 mm (centres) leaving a 3 mm gap between two panels of width 2-0. The Gap will be
covered with a decorative beading. Surface will be given a smooth finish over a coat of primer. - With 8
mm E-board

Supply and fixing of E-board wall panelling (water, fire and Termite proof) with frame work made of GI stud
profile of size 48 x 40 10 x 0.6 mm thick placed at every 610 mm C/C intervals fixed vertically in between
floor and roof `U track of size 50 x 30 x 0.6 mm thick duly fixed with self expansion screws and with 8 mm
thick E-board / 6 mm thick E-board classic cladded around with self tapping self embedding screws fixed
at every 300 mm (centres) leaving a 3 mm gap between two panels of width 2-0. The Gap will be
covered with a decorative beading. Surface will be given a smooth finish over a coat of primer. - With 6
mm E-board Designer

Supply and fixing double skin E-board partition with Frame work made of GI stud profile of size 48 x 40 x
10 x 0.6 mm thick placed at every 610 mm C/C intervals and 915 mm horizontal intervals duly fixed with
self expansion screws, the E-board of 8 mm thick cladded around with self tapping self embedding screws
fixed at every 300 mm (centres) leaving 3 mm gap between two panels of width 2-0 (610 mm). The gap
will be covered with decorative moulding surface will be given a smooth finish over cement primer.
The rate is inclusive of cost and conveyance of all materials and labour charges etc. complete.

Providing and fixing of 50mm thick EVEREST SOLID WALL PANEL Sandwich panels made of light
Weight FRACC two 4mm thick non- asbestos fibre reinforced cement sheets on either side of the
lightweight concrete core composed of Portland cement binders with tongue and groove arrangement.
The bottom of the panel shall be fixed to the floor channel made up of 1 mm thick GI channels of size
14x50x25 mm fixed to the existing floor with 6x60mm nylon self expansion screws at 600 mm C/C
and top of the panel fixed with ceiling channel made out of 1mm thick GI Channel of size 38x50x38mm
duly fixed to the existing ceiling with 6x60mm nylon self expansion screws at 600 mm C/C. All the
tongue and groove joints of the panels have to be properly cleaned and both the panels have to
be fixed by applying the mixture of fly ash and sodium silicate in between and Everest jointing
compound all the exposed joints. The rate includes cost of 50mm EVEREST SOLID WALL PANELS,
G.l. Floor and ceiling channel. The panels can be flushed by using paper tape and Everest
jointing compound all complete

Providing and fixing of 75mm thick EVEREST SOLID WALL PANEL Sandwich panels made of light
Weight FRACC two 4mm thick non- asbestos fibre reinforced cement sheets on either side of the
lightweight concrete core composed of Portland cement binders with tongue and groove arrangement.
The bottom of the panel shall be fixed to the floor channel made up of 1 mm thick GI channels of size
14x75x25 mm fixed to the existing floor with 6x60mm nylon self expansion screws at 600 mm C/C
and top of the panel fixed with ceiling channel made out of 1mm thick GI Channel of size 38x75x38mm
duly fixed to the existing ceiling with 6x60mm nylon self expansion screws at 600 mm C/C. All the
tongue and groove joints of the panels have to be properly cleaned and both the panels have to
be fixed by applying the mixture of fly ash and sodium silicate in between and Everest jointing
compound all the exposed joints. The rate includes cost of 75mm EVEREST SOLID WALL PANEL
panels, G.l. Floor and ceiling channel. The panels can be flushed by using paper tape and Everest
jointing compound all complete.

Supply and fixing of BISONPANEL (IS 14276) false ceilingusing 8MM BISONPANEL with galvanized and
pre painted steel T section of size 24mm x 38mm x 0.4mm for main T duty pre punched to accept
cross T section of size 24mm x 30mm x 0.4mm duly punched at both ends for insertion into main T.
The grid size will be 610mm x 610mm. The frame work (grid) is suspended to the roof by using G.I flat
of 0.60mm or 14-gauge G.I wire with necessary fixers to the roof and frame work. BISONPANEL lay
on the grid. The cost inclusive of necessary hardware, labor, one coat of primer (Both side) and two coats
of smooth finish on visible side.

Supply and fixing BISONPANEL(IS 14276) wall paneling using 10 MM ISONPANEL with frame work made
of GI stud section of size 48mm x 35mm x 0.55mm thick placed at every 610 mm C/C intervals vertically
and at 1200mm internals orizontally fixed to the wall by means of self expansion screws and caps.
BISONPANEL is to be fixed to frame by means of self taping screws placed at every 300 mm intervals
leaving 3mm gap between two panels. The cost inclusive of one coat of Altek primer and two coats of
Altek smooth finish and cost & conveyance of all materials, labor charges etc. complete as per the
direction of Engineer in charge.

Supply and fixing BISONPANEL (IS 14276) double skin partition using with 10 MM BISONPANEL
made out of G.I. track section of size 50mmx 35mm x 0.55 mm for fixing to the roof and floor and stud
section of size 48mm x 35mm x 0.55mm placed in track section vertically at 610mm intervals and at
1200mm intervals horizontally fixed to the wall by means of self expansion screws and caps to the wall
and roof. BISONPANEL is to be fixed both sides of frame work by using self taping screws fixed at
every 300mm intervals to the frame work leaving 3 mm gap between two panels. The cost inclusive with
one coat of Alltek primer and two coats of Alltek smooth finish and cost and conveyance of all materials to
site, labor charges etc., complete as per the direction of Engineer in charge.

Supply and fixing of BISONLAM double skin partition using with 12MM BISONLAM made out of G.I track
section of size 50 mm x 35mm x 0.55mm for fixing to the roof and floor and stud section of size 48mm x
35mm x 0.55mm placed in track section vertically at 610mm intervals and at 1200mm internals
horizontally. The frame is fixed by means of self expansion screws and caps to the wall / roof. BISON LAM
is to be fixed both sides of the frame work by using 2mm thick electro plated CR flat section leaving 3mm
gap between two panels. The cost inclusive of cost and conveyance of all materials to sites, other
materials incidentals and labour charges as per the direction of Engineer in charges.

Supply and fixing of BISONLAM wall paneling using 12MM BISONLAM with frame work made
of G.I stud section of size 48mm x 35mm x 0.55mm thick placed at every 610mm intervals vertically and
at 1200mm internals horizontally fixed to the wall by means of self expansion screws and caps. BISON
LAM is to be fixed to frame by means of self-taping screws placed at every 300mm intervals leaving 3mm
gap between two panels. The cost inclusive of Conveyance of materials, Labor charges etc., complete as
per the direction of Engineer in charge

Supply and fixing of BISON LAM aluminum glazed partitions using 10MM BISONLAM and 5.50 mm thick
plain glass to full height. Using with BISON LAM to a height of 0.91 meter at bottom panel and remaining
height with glass and aluminum sections anodized to 12 to 15 microns and of sections of size 37mm x
62mm and 1.5mm thickness with one meter centre to centre duly fixed with clip beading on both sides
including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and conveyance of all
materials etc., complete as directed during execution.

Providing and fixing 50mm thick RAJSHRI or equivalent


SEMI HEIGHT SOLID PVC PARTITION
consisting of 49mm sandwich PVC panel made out of 36mm high density expanded polystyrene
sheet(E.P.S.-Thermocole) stuck on both side with 2mm thick plain/printed /prelam PVC rigid foam sheets
reinforced with frame work made from 35mmX5mm M.S. Angle. In between two M.S. Angles 5mm thick
plain/printed/prelam heat moulded Rajshri PVC C channel of size 50X100mm with feathered edges
shall be fixed on the floor & 50X75mm with feathered edges plain/printed /prelam PVC C channel. In
between adjoining EPS sandwiched PVC partitions panel 5mm thickX75mm width plain/printed/prelam
PVC sheet feathered at edges shall be stuck on front & back face using solvent cement etc. in places
where two partitions meet to from an L shape the panels are joined 5mm thick plain/printed/prelam heat
moulded Rajshri PVC L section of size 75mmX75mm with feathered edges shall be fixed on front &
back side. This is done to maintain the symmetry of design. An additional 5mm thick PVC strip of 40mm
width is to be stuck on the interior side of the C Channel using PVC solvent adhesive, complete as per
direction of Engineer-in-Charge, manufactures specification & drawing

Providing and fixing RAJSHRI or equivalent INSULATED PVC WALL PANELING shall consist of
PVC insulated panels having wall thickness of 1mm /1.5mm/2mm PVC sheet and the desired thickness of
EPS (dependent on the insulation required) screwed into the wall using screws of adequate length. The
screws shall be placed at a distance of 150mm and shall be 25mm from the edge of the insulated panel
on all from sides of the panel. The PVC strips of 5mm thick PVC sheet of width 75mm feathered at the
edges shall be stuck using solvent cement adhesive at the places where two panels are joined, so a to
cover the screw of both the panels, using solvent cement. 90 heat bent strips of 5mm thick PVC sheets of
width 75mm X75mm feathered at the edges shall be stuck at wall joints / pillars etc. , complete as per
direction of Engineer-in- Charge, manufactures specification & drawing

Providing and fixing RAJSHRI or equivalent plain PVC rigid foam sheet wall panelling of thickness 5mm
consisting of panels having size 1220mm X2440mm stuck on inner frame work of 25mm wide strips of
5mm thick PVC rigid foam sheet. The strips should have in their centre a grove of 6mm width and 2mm
depth for sinking the head of the screw used to fix the strips to the wall and should be placed vertically at
equal intervals of 405/407mm centre to c entre. The PVC strips shall be fixed to the wall using 65mm
long M.S. screws through the groove in the strip by using PVC fasteners. The distance between two
screws shall not be more than 300mm. a groove of 2mm may be left at the joint of two panels for
aesthetic looks. This framework is done for making existing wall surface in ensured level and for sticking
the wall panelling sheet (panel) on it. The exact size of the panel and correspondingly of the grid May be
varied depending n the size of the wall. However it must ensured that a strips of 5mm thick PVC sheet of
width 75mm feathered at the edges shall be stuck at the places where two panels are joined, using
solvent cement. , complete as per direction of Engineer-in-Charge, manufactures specification &
drawing

Providing and fixing RAJSHRI or equivalent false ceiling consisting of 600mmX600mm, Solid PVC
insulation panels having wall thickness of 1mm thick plain PVC rigid foam sheet and EPS as defined
in of desired thickness depending on insulation required shall be insert in a frame work made using
anodized aluminium Tee section of sizes 1X1 (25X25mm, 19 gauge or 1mm thick) in square pattern of
grid sizes of 2X2 (600X600mm). The aluminium framework is supported from the ceiling with the help of
G.I. hook and G.I. wire/6mm.M.S. rods of required sizes to maintain proper level etc. the aluminium
framework is supported on side wall with the use of aluminium 1X1 (25X25mm) angles, complete as per
direction of Engineer-in-Charge, manufactures specification & drawing

Mineral Fibre Ceiling Tile of 0.595 mm x 0.595 mm of 13 mm thick Square Edge - Fissura Fine Model
Mineral Fibre Ceiling Tile of 0.595 mm x 0.595 mm of 13 mm thick Square Edge - Speckle Model
Mineral Fibre Ceiling Tile of 0.595 mm x 0.595 mm of 13 mm thick Square Edge - Textura Model
Mineral Fibre Ceiling Tile of 0.595 mm x 0.595 mm of 15 mm thick Standard Regular Edge
Mineral Fibre Ceiling Tile of 0.595 mm x 0.595 mm of 15 mm thick Fissura Fine Model
Mineral Fibre Ceiling Tile of 0.595 mm x 0.595 mm of 15 mm thick Speckle Model
Mineral Fibre Ceiling Tile of 0.595 mm x 0.595 mm of 15 mm thick Textura Model
Supply and fixing of PVC false ceiling on MS/GI made skeleton framework. The frame shall be 24 X
48mm MS tube section fixed along with the wall. The entire frame work shall be concealed with PVC
section having overall dimensions of 6 X 250mm with a wall thickness of 1mm 0.3mm with tongue and
groove system, provided with necessary arrangements for electrical connections, complete, for finished
item of work.
Supply and fixing of wall panelling on the framework of wooded rippers of 24 X 24mm of required size.
The entire framework shall be panelled with PVC section having overall dimensions of 6 X 250mm with a
wall thickness of 1mm 0.3mm. The panels are joined with tongue and groove system. Necessary cutouts for electrical connections to be provided at required places complete, for finished item of work.

Supply and fixing of PVC Double Skin Partition.The entire framework shall be carried out by mild
steel section having overall dimensions of 24 X 48mm with a wall thickness of 1.2mm. The entire
framework shall be concealed with PVC section having overall dimensions of 6 X 250mm with a wall
thickness of 1mm 0.3mm both sides. Glass provision/Door provision can be provided along the partition
wherever required. Partitions can be made full or half as per requirement complete, for finished item of
work.

NCL or equivalent Partitions: Supply and fixing of partitions made of seccolor pre-painted steel (base
steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM). Primer
coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick
alkyd backer. Section for outer frame should be 46x52mm, section for shutter should be 46x46mm,
section for mullion should be 46x70mm, section for beading should be 18x25mm and section for middle
and bottom rail (Lock Rail and Kick Rail) of size should be 23x130mm. The partition should be
paneled with 9mm pre- laminated particle board to a height of 0.91m from the bottom, and remaining
height with 5mm thick plain glass With Ethyl Propylene Diamine Monomer (EPDM) Gaskets. The sections
are to be cut to length, mitre joined with corner bracket Centre mullions are to be fixed using mullion cap.
Gaskets made of Ethyl Propylene Diamine Monomer (EPDM). Corner brackets made of CRCA with zinc
phosphate.
Mullion caps made of Glass filled nylon.
The above frames should be fixed to the
concrete/masonry wall by means of self expanding screws, and complete for finished item of work.

Fixed Partition: Outer frame section size of 46x52mm, mullion section should be of 46x70mm, fixed
beading should be of 18x25mm.
Fixed Partition with Door: Outer frame section size of 46x52mm, mullion section should be of 46x70mm,
fixed beading should be of 18x25mm, section for shutter should be of 46x46mm and section for middle &
bottom should be of size 23x130mm
Supply & fixing of 50 mm thick sandwiched panel of two fiber- reinforced cement sheets enclosing a
lightweight concrete core composed of portland cement, binders and a mix of silicaceous and micaceous
material aggregate having Tongue and Groove joint for partitions and walls using G.I. Flooring & Ceiling
channels, hardware, Labour, transportation, wastages, etc., as a complete item of work excluding
finishing, fittings & fixtures.

Supply & fixing of 75 mm thick sandwiched panel of two fiber- reinforced cement sheets enclosing a
lightweight concrete core composed of portland cement, binders and a mix of silicaceous and micaceous
material aggregate having Tongue and Groove joint for partitions and walls using G.I. Flooring & Ceiling
channels, hardware, Labour, transportation, wastages, etc., as a complete item of work excluding
finishing, fittings & fixtures.

Supply of sandwiched panel of two fiber-reinforced cement sheets enclosing a lightweight concrete core
composed of Portland cement, binders and a mix of silicaceous and micaceous material aggregate
panels of 50mm thick x 600mm standard width x 2400mm, 2700mm, 3000mm & 3300mm lengths
Supply of sandwiched panel of two fiber-reinforced cement sheets enclosing a lightweight concrete core
composed of Portland cement, binders and a mix of silicaceous and micaceous material aggregate
panels of 75mm thick x 600mm standard width x 2400mm, 2700mm, 3000mm & 3300mm lengths
Providing & fixing Pre-coated G.I. Wall angle size 22mm X 20mm X 0 .4 mm thick of 3050mm
long fixed to the brick wall/ partition at the perimeter of ceiling with nylon sleeves and screw at
610 mm centres. Then suspending main G! Frame "T" section size of 32mm X 24mm X 0.30mm
thick of 3600mm long from soffit in one direction with the help of Rawl Plug and G.I. Wire / Rod of
3mm diameter with 1220mm centres G.I. Cross "T" section of size 25mm X 24mm X 0.30mm
thick of 600mm long is inserted into the slots provided in main "T" at 600mm centres to form a
grid of 600mm X 600mm. New AGE 12/ 15mm tiles of size600mm X 600mm can be laid on to
the grid etc. NewAGE tiles with a Humidity resistance of 95% RH, Average NRC 0.55 to 0.60,Light
reflectance >85% K value 0.052- 0.57 ,Fire performance class O/Class 1 (BS 476) along with
surface 3 coats of white paint as directed by department officers.

Regular Pin Holes PH-001 (Square & Tegular Edge) 12mm


Fin Fissured Model FF-002 (Square & Tegular Edge) 12mm
Random Holes AF-003 (Square & Tegular Edge) 12mm
Random Pin Holes APH-004 (Square & Tegular edge) 12 mm
Sand Face ASF-005 (Square & Tegular Edge) 12mm
Regular Pin Holes PH-001 (Square & Tegular Edge) 15mm
Fin Fissured Model FF-002 (Square & Tegular Edge)

15mm

Random Holes AF-003 (Square & Tegular Edge) 15mm


Random Pin Holes APH-004 (Square & Tegular Edge) 15 mm
Sand Face ASF-005 (Square & Tegular Edge) 15mm
Vinyl laminated MPL Gypsum Panels 600 X 600 X 9 mm
Supply and fixing of wall panelling of 8 mm thick V-BOARD (IS 14862) provided with frame work
made of GI stud profile of size 48 x 40 x 10 x 0.55 mm thick placed at every 610 mm C/C
intervals fixed vertically in between floor and roof U track of size 50 x 30 x 0.6 mm thick duly
fixed with self-tapping, self- embedding screws fixed around at every 300 mm (centres) leaving
a 3 mm gap. The Gap will be covered with a decorative beading or jointing compound. Surface will be
given a smooth finish with one coat of primer. Inclusive of all taxes.

Supply and fixing of wall panelling of 10 mm thick V-BOARD (IS 14862) provided with frame work
made of GI stud profile of size 48 x 40 x 10 x 0.55 mm thick placed at every 610 mm C/C
intervals fixed vertically in between floor and roof U track of size 50 x 30 x 0.6 mm thick duly
fixed with self-tapping, self- embedding screws fixed around at every 300 mm (centres) leaving
a 3 mm gap. The Gap will be covered with a decorative beading or jointing compound. Surface will be
given a smooth finish with one coat of primer. Inclusive of all taxes.

Supply and fixing double skin 8mm thick V- BOARD (IS 14862) partition with Frame work made
of GI stud profile of size 48x40x10x 0.55 mm thick placed at every 610 mm C/C intervals and
1220 mm horizontal intervals duly fixed with self- expansion screws, the V- Board of 8 mm
thick cladded around with self-tapping self-embedding screws fixed at every 300 mm (centres)
leaving a 3 mm gap. The Gap will be covered with a decorative moulding surface will be given a
smooth finish with one coat of primer. The rate Inclusive of cost and conveyance of all materials
and labour charges etc., Complete.

Supply and installation of V-PLANKS(IS 14862) of size 150 x 3000 x 8mm manufactured by M/s.
Visaka Industries Limited, on to an existing steel structure made using Top hat profile / furring
channel of 51mm web, 22mm flange of 0.5mm thick (minimum) fastened to the plastered brick
wall using anchor bolts / anchor screws, spaced at every 2 (610mm). V planks are screwed to
the furring channel using self-drilling screws of 8g x 25mm (minimum) at every 2 at distance of
15mm from the edge of the plank. V Planks fixing is started from the bottom, followed by
next plank overlapped by 25mm on to the
bottom plan thereby hiding the screws perfectly and
continued up to the top. Water based cement primer should be applied to the planks before finishing
with the exterior grade paints. (up to 3 floors) Above 3 floors labour charges will be extra and
steel grid will change.

Supply and installation of V- PLANKS (IS 14862) of size 200 x 3000 x 8mm thick
manufactured by M/s. Visaka Industries Limited, on to an existing steel structure made using
Top hat profile / furring channel of 51mm web, 22mm flange of 0.5mm thick (minimum) fastened
to the plastered brick wall using anchor bolts / anchor screws, spaced at every 2 (610mm). V
planks are screwed to the furring channel using self-drilling CSK screws of 8g x 25mm (minimum)
at every 2 at distance of 15mm from the edge of the plank. V- Planks fixing is started from
the bottom, followed by next plank overlapped by 25mm on to the bottom plan thereby hiding. The
screws perfectly and continued up to the top. Water based cement primer should be applied to the
planks before finishing with the exterior grade paints. (up to 3 floors) Above 3 floors labour
charges will be extra and steel grid will change.

Supply& fixing of 50 mm thick V-PANEL comprise of two 5mm thick V-Boards (asbestos-free fibre reinforced
cement sheets conforming to IS 14862) strongly bonded with core material which is light weight
concrete mix of Portland cement, expanded polystyrene bead aggregates and admixture. V- Panels
with unique semi-circular Tongue & Groove Joining System provides better stability, rapid installation and
better workability. The bottom of the panel shall be fixed to the floor channel made up of 1 mm thick GI
channels of size 28x52x31 mm fixed to the existing floor with 6x60mm nylon self- expansion screws
at 600 mm C/C and top of the panel fixed with ceiling channel made out of 0.8 mm thick GI Channel of
size 31 x 52 x 31 mm duly fixed to the existing ceiling with 6x60mm nylon self-expansion screws at 600
mm C/C. All the tongue and groove joints of the panels have to be properly cleaned and both the panels
have to be fixed by applying the jointing compound in all the exposed joints. The rate includes cost of 50mm
V-PANELS, G.l. Floor and ceiling Channel.

Supply& fixing of 75 mm thick V-PANEL comprise of two 5mm thick V- Boards (asbestos-free fibre
reinforced cement sheets conforming to IS 14862) strongly bonded with core material which is
light weight concrete mix of Portland cement, expanded polystyrene bead aggregates and
admixture. V- Panels with unique semi-circular Tongue & Groove Joining System provides
better stability, rapid installation and better workability. The bottom of the panel shall be fixed to the
floor channel made up of 1 mm thick GI channels of size 28x77x31 mm fixed to the existing
floor with 6x60mm nylon self- expansion screws at 600 mm C/C and top of the panel fixed
with ceiling channel made out of 0.8 mm thick GI Channel of size 31x77x31 mm duly fixed to
the existing ceiling with 6x60mm nylon self-expansion screws at 600 mm C/C. All the tongue
and groove joints of the panels have to be properly cleaned and both the panels have to be
fixed by applying the jointing compound in all the exposed joints. The rate includes cost of 75mm
V-PANELS, G.l. Floor and ceiling Channel.

DOORS
Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall
thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and
joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door
profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed
to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of
4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member
etc. complete as per manufacturers specification and direction of Engineer-in-Charge for finished item
of work

Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes
of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S.
frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be
covered with 5mm thick heat moulded PVC C channel of size 30 x 50mm forming stiles, and 5mm thick,
75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick,
20mm wide cross PVC sheet as gap insert for top rail & bottom rail.Panelling of 5mm thick PVC sheet to
be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet
beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick
PVC strip of 20mm width is to be stuck on the interior side of the C Channel using PVC solvent adhesive.
Complete as per direction of Engineer-in- charge, manufacturers specification & drawing for finished item
of work .

Providing and fixing 30mm thick RAJSHRI or equivalent BRAND FACTORY MADE BOTHSIDE
PRELAM SOLID PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge
thickness and size of 19mmX19mm for stiles, top and bottom rails. MS. Frame shall have a coat of steel
primers of approved make and manufacture. MS. Frame covered with 5mm thick heat moulded Rajshri
Prelam Pac C channel of size 30mm thickness, 70mm width out of which 50mm shall be flat and 20mm
shall be tapered in 450 angle on either side forming stiles; and 5mm thick, 95mm wide Rajshri Prelam
Pac sheet out of which 75mm shall be flat and 20mm shall be tapered in 450 on the inner side to form top
and bottom rail 11 5mm wide Rajshri Prelam Pac sheet out of which 75mm shall be flat and 20mm shall
be tapered on both sides to form lock rail. Top, bottom and lock rail shall be provided either side of the
panel. 10mm (5mmX2) thick, 20mmwide cross Pac sheet shall be provided as gap insert for top and
bottom rail. Panelling of 5mm thick both side Prelam Pac sheet to be fitted in the MS. Frame welded/
sealed to the stiles & rails with 7mm(5mm+2mm) thick X 15mm wide Pac sheet beading on inner
side, and joined together with solvent cement adhesive etc. an additional 5mm thick Pac strip of 20mm
width is to be stuck on the interior side of the C channel using Pac solvent cement adhesive etc.
complete as per direction of Engineer in-charge, manufacture specification and drawing.

Providing and fixing 30mm thick RAJSHRI or equivalent BRAND FACTORY MADE SOLID SINGLE
SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge
thickness and size of 19mmX19mm for stiles, and 15mmX15mm for top and bottom rails. The MS. Frame
shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm
thick heat moulded Rajshri single side Prelam Pac C channel of size 30mmX50mm to form stiles.5mm
thick& 75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails. Panelling of
5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed to the front (prelam side) stiles
and rails (which should have a 5mm 45 bent portion as beading) and attached to the back(white/ivory)
stiles and rails which should have a 10mm 900 bent portion as beading ) using 2nos. 15mm wide X
5mm thick Pac sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be joined to
the panel using solvent cement etc. an additional 5mm thick Pac strip of 20mm width to be stuck on the
interior side of the C channel using Pac solvent cement adhesive and 10mm(5mmX2) thick, 20mm wide
cross Pac sheet to be fitted as gap insert for top and bottom rail etc. complete as per direction of
Engineer in-Charge, manufacture specification and drawing.

SUPPLY & FIXING or RAJSHRI or equivalent SINGLE SIDE PRELAM SOLID PANEL PVC DOOR
FRAME (CHOUKHAT) Providing and fixing factory made Pac single side Prelam door frame of the size
50X47 mm with a wall thickness of 5mm, made out of extruded 5mm rigid Pac single side prelam sheet,
meter cut at two corners and joined with 2nos. of 150mm long brackets of 1515mm MS.Square tube. The
two vertical door profiles are to be reinforced with 19X19mm MS. square tube of 19guage. The door frame
shall be fixed to the wall using 65/100mm long MS. Screws through the frame by using Pac fasteners. a
minimum of 4nos. of screws to be provided for each vertical member and minimum 2nos. for horizontal
member etc. complete as per manufacture specification and direction of Engineer-in-charge.

Providing and fixing 35mm thick RAJSHRI or equivalent BRAND FACTORY MADE MOULDED DOOR
SHUTTER consisting of solid core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3)
thick X 30mm width on one stiles and top rails and 10mm (5mmX2) thick X 30mm width on the
other stiles and bottom rails. The inner panel laminated with 2mm thick termite proof, water proof and fire
resistant moulded Pac sheet with 2,4,6 raised panel design in different panel and / or prelam colours on
one side after routing the moulded design on flush door and 2mm prelam Pac sheet on other side using
rubber adhesive on flush door and solvent cement adhesive on Pac lipping etc. complete as per direction
of Engineer-in-Charge, manufacture specification and drawing

RAJSHRI or equivalent MOULDED PVC DOOR WOOD FREE : Providing and fixing 30mm thick
Rajshri Brand factory made Moulded door shutter- wood free consisting of frame made out of MS. tubes
19gauge thickness and size of 25mmX25mm for stiles, top and bottom rails. MS. Frame shall have a coat
of steel primers. The inner panel shall consist of 25mm thick High density EPS conforming to IS 46711984 bounded with 2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6
raised panel design in different plain and / or prelam colours after routing to the moulded design on one
side and 2mm plain and / or prelam Pac sheet on other side of the EPS. The edge of panel to be sealed
with lipping of 10mm wide PVC sheet bottom (made by sticking 2 rigid foam sheet of 5mm thickness using
Pac solvent cement) and stiles sides 25mm(5mmX5) thick and 30mm width Pac sheet fitted along Ms.
Tube for lock provision for lock height 5mm thick Pac sheet of size 150mmX100mm fixed with upper and
lower face of inner side of EPS Panel etc. Complete as per direction of Engineer in-Charge,
manufacture specification and drawing

Providing and fixing 30mm thick RAJSHRI or equivalent BRAND FACTORY MADE WIRE MESH SOLID
PVC DOOR SHUTTER consisting of frame made out of M.S. tubes of 19 gauge thickness and size of
19mmX19mm for stiles and 15mm for top, lock & bottom rails. MS. Frame shall have a coat of steel
primers of approved make and manufacture. 19mmX19mm M.S. square tubes shall be covered
with 5mm thick heat moulded Rajshri PVC C channel of size 30mm thickness, 90mm width out of which
75mm shall be flat and 15mm shall be flat and 15mm shall be bent in 900 on the inner side to from top
and bottom rail land 130mm wide PVC sheet out of which 100mm shall be flat and 154mm shall be bent
in 900 on both side to from lock rail, 10mm(5mmX2) thick, 20mm wide cross PVC sheet as gap insert for
top rail & bottom rail. Panel will be of G.I.wire mesh of 24gauge to be fitted in by C channel of size 35mm
X10mm on the either side in the stiles. The inner side C channel is fixed by 19mmX19mm MS. Tube on
both sides with screws. The wire mesh in top bottom & lock rail is sealed with15mm X 15mm tube
with G.I.wire 10mm(5mmX2) thick PVC strip of 25mm width is to be stuck& nails on both side of G.I. wire
mesh interior at the top, bottom & lock rail. An additional 5mm thick PVC srip of 20mm width is to be stuck
on the interior side of the C channel using PVC solvent cement adhesive etc. complete as per direction
of Engineer-in-charge, manufacturers specification & drawings

Providing and fixing RAJSHRI PVC door cladding to the flush doors shutters . For the new doors it
shall be pasted with Fevicol SSR 998 or nailed to the old doors. complete as per direction of Engineer in
charge, manufacturers specification and drawing - 1 mm thick
Providing and fixing RAJSHRI PVC door cladding to the flush doors shutters . For the new doors it
shall be pasted with Fevicol SSR 998 or nailed to the old doors. complete as per direction of Engineer in
charge, manufacturers specification and drawing - 1.5 mm thick
Providing and fixing RAJSHRI PVC door cladding to the flush doors shutters . For the new doors it
shall be pasted with Fevicol SSR 998 or nailed to the old doors. complete as per direction of Engineer in
charge, manufacturers specification and drawing - 2.0 mm thick
Flush door shutters, solid bond wood block board type with teak ply on both faces.: 25 mmthick
conforming to IS:2202
Flush door shutters, solid bond wood block board type with teak ply on both faces.: 30 mmthick
conforming to IS:2202
Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mmthick
conforming to IS:2202
Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 25
mmthick conforming to IS:2202
Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 30
mmthick conforming to IS:2202
Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 35
mmthick conforming to IS:2202
Flush door shutters, solid bond wood block board type with commercial ply on both faces.: 40
mmthick conforming to IS:2202
Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply
on another face (lipping): 20 mmthick conforming to IS:2202
Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply
on another face (lipping): 25 mmthick conforming to IS:2202
Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply
on another face (lipping): 30 mmthick conforming to IS:2202

Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply
on another face (lipping): 35 mmthick conforming to IS:2202
Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply
on another face (lipping): 40 mmthick conforming to IS:2202
Supply and fixing of E-board door shutter with alround style U lipping size 15 x 18 x 15 mm made from
0.8 mm thick powder coated cold rolled steel profiles with 16 mm thick E-board with necessary screws
fixed at 1-0 interval 250 mm long aldrops 2 Nos. M.S. nickel coated 250 mm long 1 No. M.S.
Tower bolts including cost and conveyance of all materials at site and applying 1 coat of primer, 2
coats of luppum and 2 coats of synthetic enamel paint as per approved design for finished item of
work.
Providing and fixing frame made from 1.2 mm powder coated cold rolled steel profiles of overall section
size of 60 mm x 45 mm with 21 mm rivet for shutter with necessary stiffeners hinges and screws. E-board
shutter with alround `U lipping of size 15 X 18 X 15 mm made from 0.8 mm thick CRCA powder coated
steel profile with 16 mm thick E-board with necessary screws fixed at every 1- 0 interval 250 mm long
aldrops 2 Nos. MS Nickel coated 250 mm long 1 No. MS tower bolt including cost and conveyance. One
coat of primer, 2 coats of luppum and 2 coats of synthetic enamel paint as per approved colour, labour
charges etc.
Supply and fixing of BISONPANEL(IS 14276) cup board frames and shutters and using 16mm BISON
PANEL dulypainted both sides with one coat of primer and two coats of synthetic / enamel paint of
approved shade and brand including fixing of hardware like M.S. powder coated Piano hinges of size
18mm x 18mm, brass ball catches, Aluminum tower bolts and handles , Godrej locks, Fevicol, screws
and nails including cost and conveyance of all materials, labor charges, all incidental and operational
charges etc., complete for finished item of work at site as per the directions of Engineer in Charge.

Supply and fixing BISONPANEL (IS 14276) single door shutter using with 16MM BISONPANEL with allround "U" section of size 12mmx18mmx12mm made from 0.6 mm thick galvanized, color quoted cold
rolled steel profiles with necessary screws fixed at every 304.8 mm intervals. The cost inclusive of MS
Nickel coated Aldrops of size 255 mm long 2 Nos., 200 mm long tower bolts 1 No., 125 mm handles 2
Nos. 300 mm long "T" hinge cost and conveyance of all materials at site and applying 1 coat primer, 1
coat of luppum and 2 coats of synthetic enamel paint as per approved design for finished item of work.

Supply and fixing of BISON PANEL(IS 14276) door shutters using with 16MM BISONPANEL with all
round style U size of 20mmx18mm x20mm made from 0.6mm thick galvanized pre- painted cold
rolled steel profiles with BISONPANEL separating two shutter with 30mmx18mmx30mm Stepped lipping
with necessary screws fixed at every 1-0 (304.8mm) intervals. Ms Nickel coated
250 mm long aldrops 2 nos, MS powder coated 250mm long tower bolt 2nos , & 2nos MS powder
coated 125 mm long grip handle. Including cost and conveyance of all materials at site and applying one
coat of primer, 2 coats of lappum and 2 coats of synthetic enamel paint as per approved design for
finished item of work.

Supply and fixing of BISON LAM single door shutter using 16MM BISONLAM with all round section U
size of mm thick galvanized pre-painted cold rolled steel profiles BISON LAM with necessary screws fixed
at every 10 ( 304.8mm) intervals. The cost inclusive of MS Nickel coated 250mm long aldrops 2 nos ,
MS powder coated 250mm long tower bolt 1 nos, 2nos MS powdercoated 125mm long grip handle, 1
nos M.S.P.C. Door stopper. Including cost and conveyance of all materials at site labour charges etc.,
complete finished item of work.

Supply and fixing of BISON LAM double door shutter using 16MM BISONLAM with all round U section
size of 20mm x 18mm x 20mm made from 0.6mm thick galvanized pre-painted cold rolled steel profiles
with BISON LAM separating two shutter with 30mm x 20mm x 30mm stepped lipping with necessary
screws fixed at every 10 (304.8mm) intervals. The cost inclusive of MS Nickel coated 250mm long
aldrops 2nos, MS powder coated 125mm long grip handle, 2 nos M.S.P.C. Door stopper. Including
cost and conveyance of all materials at site labour charges etc., complete finished item of work.

Doors Frames (Colour Coated Steel Sections) & Shutter using Cement Bonded Particle Board as per
IS 14276 (Bison Panel or equivalent ) : Providing and fixing of door frame made from cold roll formed
sections made of galvanized (Base steel as per IS277 with zinc of 120 Gms/sqm) colour coated steel
sections with total coated thickness of 1mm, primer coated with epoxy primer coat of 5-7 microns thick,
finish paint with polyester paint of 12-16 microns. The Section for door frame is to be filled with
polyurethane (P.U) form of 40kg/m3. Overall size of frame section should be of 50mm x 50mm. With
necessary corner brackets, stiffeners, hinges, and screws. Cement Bonded particle board shutter (Bison
Panel or equivalent ) Single Leaf with all round styles U section of size 12m x 18m x 12mm made from
0.6 mm thick galvanized, colour coated cold rolled steel profiles with 16mm thick Cement Bonded
particle Board (Bison Panel or equivalent ) with necessary screws fixed at every 1-0 (304.8mm) intervals.
The cost inclusive of MS nickel coated Aldrop of size 250mm long 2nos. 200mm long tower bolt 1no.,
125mm handles 2nos., cost and conveyance of all materials at site and applying one coat primer , one
coat of luppum and two coats of synthetic enamel paint as per approved design for finished item of work

Supply and fixing of BISONPANEL (IS 14276) box type cup board using BISONPANEL for making frame
of size 100mm x 35mm using two sandwiched 16MM boards, one BISONPANEL and one BISONLAM
with plain 35mm wood lipping. The Shutters are made of 16MM thick BISONLAM (Pre-Laminated Cement
Bonded Particle Board) of approved shade inclusive of hardware like M.S. powder coated Piano hinges of
size x , Aluminum powder coated handles of size 4 (101.6mm), Aluminum tower bolt 4 (101.6mm)
Godrej locks, screws, wood lipping and Fevicol etc., complete finish item of work.

Supply and fixing of BISONLAM door shutter made out of U sections of size 12x14x12 made from
0.6mm thick pps sections with 12MM BISONLAM with necessary screws fixed at every
1.0interwells. The hardware consists of 250mm long aldrop 2 Nos.150mm Handle- 1 No , 150 mm long
ms powder coated tower bolt 1 no. nickle coated. The cost is inclusive of all incidentals, labor
transportation charges.
Supply and fixing of V- Board door shutter with alround style U lipping size 15 x 18 x 15 mm made from
0.8 mm thick powder coated cold rolled steel profiles with 16 mm thick V-board with necessary screws
fixed at 1-0 interval 250 mm long aldrops 2 nos. M.S. nickel coated 250 mm long 1 no. M.S. Tower Bolts
Including cost and conveyance of all materials at site and applying 1 coat of primer, 2 coats of luppum and
2 coats of synthetic enamel paint as per approved design for finished item of work.

Providing and fixing frame made from 1.2 mm powder coated cold rolled steel profiles of overall section
size of 60 mm x 45 mm with 21 mm rivet for shutter with necessary stiffeners hinges and screws. VBoard shutter with alround style U lipping of size 15 x 18 x 15 mm made from 0.8 mm thick CRCA
powder coated steel profile with 16 mm thick V-board with necessary screws fixed at every 1-0 interval
250 mm long aldrops 2 nos. M.S. nickel coated 250 mm long 1 no. M.S. Tower Bolts Including
cost and conveyance. One coat of primer, 2 coats of luppum and 2 coats of synthetic enamel paint as
per approved colour, labour charges etc.,.

Supply and fixing Sintex or equivalent doors are made out of PVC section and panels. The overall
dimension of the same is 33mm X 47mm with usual process variation and having a wall thickness of
1.5mm with a variation of 0.3mm. The infill is seamless hallow multi chambered PVC single panel
having an effective dimension of 762mm X 20mm having a wall thickness of 1mm 0.3mm complete, for
finished item of work.
Supply and fixing PVC door frames made from extruded sections in overall dimensions of 40 X 48mm
having a wall thickness of 1.5mm with usual process variation of 0.3mm, complete, for finished item of
work.
Supply and fixing of V-board wall panelling (water, fire and termite resistant) with frame work made of GI
stud profile of size 48 x 40 x 10 x 0.6 mm thick placed at every 610 mm C/C intervals fixed vertically in
between floor and roof U track of size 50 x 30 x 0.6 mm thick duly fixed with self expansion screws and
with 8 mm thick V- Board / Cladded around with self tapping self embedding screws fixed at every 300
mm (centres) leaving a 3 mm gap between two panels of width 2-0. The Gap will be covered with a
decorative beading. Surface will be given a smooth finish over a coat of primer. Inclusive of all taxes: With
8 mm V- Board

Supply and fixing double skin V- Board partition with Frame work made of GI stud profile of size 48x40x
10x 0.6 mm thick placed at every 610 mm C/C intervals and 915 mm horizontal intervals duly fixed with
self expansion screws, the V- Board of 8 mm thick cladded around with self tapping self embedding
screws fixed at every 300 mm (centres) leaving a 3 mm gap between two panels of width 2-0(610 mm).
The Gap will be covered with a decorative moulding surface will be given a smooth finish over
cement primer. The rate Inclusive of cost and conveyance of all materials and labour charges etc.,
Complete. DOUBLE SKIN PARTITION

Supply and fixing of PVC cupboards for kitchen and bedrooms shall be made out of multi chambered
PVC sections having overall dimensions of 20 X 762mm with a wall thickness of 1.2mm
0.3mm. The cabinets shall be made as per the requirements of the room with groove system. The PVC
section surface shall be plain and laminated finish to have good look, completed, for finished item of work
for SINTEX OR equivalent PVC CABINETS
Supply and fixing of Sintex Frontura door shutter consisting of Sintex make or equivalent FRP (Fibre
Reinforced Plastic) panels on either sides with depressed panelled design for door having overall wall
thickness of 1.5mm + 0.35 mm with usual process variation. The core of the door shutter shall be filled
with Polyurethane foam (PUF) injected with the help of Hydraulic Injection method, wooden black of
35mm x 31mm shall be provided on all four side of the door shutter. Necessary wooden blacks shall be
provided to take up necessary hard wares and fixtures etc. with steel wire mesh at the centre of the
door the rate inclusive of all taxes and finished item work. Max size: 838mm (W) x 2060mm(H) Colour
GOLDEN BROWN. SINTEX FRONTURA DOOR SHUTTER (25MM THICK)

Supply and fixing of Sintex door shutter made from specially hot press moulded SMC (Sheet
moulding compound) sheet polythen core and PVC Frame section. SMC sheets shall be made
from SMC confirming to IS-`13410 sheets shall have an average thickness of 1.4mm+/- 0.35mm on
both sides. Core of the door shall be filled with high density polyurethane foam injected with the
help of hydraulic injection method shutter frame to be made of PVC Extruded section of 26mm x
47mm with a wall thickness of 1.4mm+/-0.3mm on both sides corresponding to Sintex code
DWUF 305 the hardware location shall be reinforced with special polymeric reinforcement
wooden blocks of suitable size.
The corners of the shutter frame shall be reinforced with
polymeric L shaped angle size of 105 x 230mm corresponding Sintex code PR-02 the lock rail
shall be made from PVC Extruded sections having overall dimensions of 26mm x 47mm x
1.4mm +/- 0.3mm on both sides. The usual process of variation corresponding Sintex code of 305
combining two nos. wooden pieces are inserted on the periphery suitable M.S. Tube reinforcement
shall be provided on the one vertical side of shutter frame

Supply and fixing of Sintex Door shutter made from specially Hot Press Moulded SMC (Sheet moulding
compound) sheets, Polyurethane core and PVC Frame section SMC sheets shall be made from SMC
conforming to IS-13410 sheets shall have an average thickness of 1.4 mm +/- 0.35 mm on both sides.
Core of the door shutter shall be filled with high density polyurethane foam, injected with the help of
hydraulic injection method shutter frame to be made of PVC extruded section conforming to IS:
10151: 1982 of size 26 mm x 46 mm with a wall thickness of 1.4 mm +/- 0.3 mm on both sides
corresponding to Sintex code DWUF 305. The hardware locations shall be reinforced with special
polymeric reinforcement wooden blocks of suitable size. The corners of the shutter frame shall be
reinforced with Polymeric L shaped angle of size 105mm x 230mm corresponding to Sintex code PR-02
the lock rail shall be made from PVC extruded sections having overall dimensions of 26 mm x 46 mm 1.5
mm +/- 0.3 mm on both sides, with usual process variation corresponding to Sintex code 305 combining
two numbers. Wooden pieces are inserted on the periphery. Suitable MS Tube reinforcement shall be
provided on vertical sides of shutter frame the rate inclusive of all taxes and finished item work Colour:
White & Grey

SINTEX ENDURA DOOR SHUTTER (26MM THICK)


Supply and fixing of door shutters made of rigid PVC extruded hollow section(Nandi or equivalent ) of
20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally divided into 4 no's with tongue and
groove locking arrangements. The shutter frame is made of 30mm X 79mm with the wall thickness of
1.5mm +/- 0.15mm section mitre-cut and joined at 4 corners with 125mm X 225mm plastic brackets.
The shutter shall be horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood batons shall be
reinforced inside the door shutter during the fabrication of the door shutter at those points wherever the
hardware is fixed onto the door shutter.

Supply and fixing of door frame made of hollow extruded PVC section (Nandi or equivalent ) having
dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood
plank at the hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME
(Nandi or equivalent )
Supply and fixing of door frame made of hollow extruded PVC section (Nandi or equivalent ) having
dimensions of 40 X 46 mm with the wall thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood
plank at the hinges side. The door frame top 2 corners shall be mitre cut/welded
Supply & fixing of Fly mesh shutters of size 20 x 40 mm fly proof mesh with std. Spn (S.S.) fly mesh
including cost and conveyance of all materials, and labour charges etc. complete for finished item of
work.: Single shutter 2'-0" x 4'-0" (609.6x1219.2mm) shutter section size 20 x 40 mm

Supply & fixing of Fly mesh shutters of size 20 x 40 mm fly proof mesh with std. Spn (S.S.) fly mesh
including cost and conveyance of all materials, and labour charges etc. complete for finished item of
work.: Double shutter 3'-0" x 4'-0" (914.4 x 1219.2mm) shutter section size 20 x 40 mm
Supply & fixing of Fly mesh shutters of size 20 x 40 mm fly proof mesh with std. Spn (S.S.) fly mesh
including cost and conveyance of all materials, and labour charges etc. complete for finished item of
work.: Double shutter 4'-0" x 4'-0" (1219.2 x 1219.2mm) shutter section size 20 x 40 mm
Supply & fixing of Fly mesh shutters of size 20 x 40 mm fly proof mesh with Netlon fly mesh including cost
and conveyance of all materials, and labour charges etc. complete for finished item of work.: Single
shutter 2'-0" x 4'-0" (609.6x1219.2mm) shutter section size 20 x 40 mm
Supply & fixing of Fly mesh shutters of size 20 x 40 mm fly proof mesh with Netlon fly mesh including cost
and conveyance of all materials, and labour charges etc. complete for finished item of work.: Double
shutter 3'-0" x 4'-0" (914.4 x 1219.2mm) shutter section size 20 x 40 mm
Supply & fixing of Fly mesh shutters of size 20 x 40 mm fly proof mesh with Netlon fly mesh including cost
and conveyance of all materials, and labour charges etc. complete for finished item of work.: Double
shutter 4'-0" x 4'-0" (1219.2 x 1219.2mm) shutter section size 20 x 40 mm
Supply & fixing of Door frames made of all formed sections of 1.25mm thick CRCA section, size should be
50x60mm with 32mm rebate. The corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure polyester paint. The frame should be
provided with approved quality butt hinges of 3 Nos. complete for finished item.: Single shutter 3'0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x 60 mm

Supply & fixing of Door frames made of all formed sections of 1.25mm thick CRCA section, size should be
50x60mm with 32mm rebate. The corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure polyester paint. The frame should be
provided with approved quality butt hinges of 3 Nos. complete for finished item.: Double shutter 5'0" x 7'-0" (1524 x 2133.6mm) outer frame section size of 50 x 60 mm

Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick CRCA section, size should
be 50 x 60 mm with 32 mm rebate. The corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure polyester paint. The frame should be
provided with approved quality butt hinges of 3 Nos. Complete for finished item of work.: Single shutter
3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x 75 mm

Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick CRCA section, size should
be 50 x 60 mm with 32 mm rebate. The corner of the frame should be welded. The frame should be
painted with one coat of primer and finished painted with pure polyester paint. The frame should be
provided with approved quality butt hinges of 3 Nos. Complete for finished item of work.: Single shutter 5'0" x 7'-0" (1524x2133.6mm) outer frame section size of 50 x 75 mm

Providing and fixing door frames fabricated from sections made of galvanized steel powder coated
(base steel as per IS 513, galvanised as per IS 277 with zinc of 120 grams / square metre), the
factory made section are powder coated with pure polyester powder of 50-60 microns thick with total
coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to
accommodate 35 mm thick door shutter, with groove to insert gasket in the frame section, frame section
filled with polyurethane foam, cut to length, and joined by way of welding, each frame provided with: a)
2mm thick MS powder coated butt hinges of 100 mm long 3 Nos. for single shutter, 6 Nos. for double
shutter. b) CRCA electroplates stiffeners of 6 Nos. 3 in each vertical. c) 40 mm x 200 mm x 1.2 mm hold
fasts screwed to stiffeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver 1 No. for single shutter
frame. e)Tie Rod 1 No

Providing and fixing of door frames factory made, internal door frames without threshold, fabricated from
pre painted cold roll formed section 100 mm x 60 mm made of galvanized (base steel as per IS-513 D
quality galvanized as per IS-277 with Zinc of 120 Gms/sqm) steel colour coated sections with total coated
thickness of 1 mm primer coated with epoxy primer of 5-7 microns thick finish painted with polyester paint
of 12-16 microns and back coated with alkyd backer of 5-7 microns, the frame section filled with
polyurethane (PU Foam) of 40 kg/Cu.m and the sections cut to length and mitre joined by means of 1.25
mm thick CRCA electroplated corner brackets of size 75 x 75 mm and 1.25 mm thick electroplated
stiffeners of size 150 mm for fixing hold fasts and hinges with MS Powder coated fittings a) 6 Nos M.S. Z
Type hold fasts made of 30 mm x 3 mm MS flat of 230 mm long, 3 Nos each size expandable PVC
covered screw type fasteners b) 2.5 mm x 300 mm long T hinges /2.5 mm x 50 mm x 50 mm x 100 mm
two way but hinges (3 Nos for single leaf or 2 Nos for Double leaf/leaf) c) 12 mm dia MS tie rod at bottom
with necessary size of nuts on either side.

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding doors three track - only two glass
shutters sliding - 95 - Series duly manufactured using UPVC reinforced profiles of 95.50 mm x 60 mm x
2.25 mm for outer frames, 66 mm x 42 mm x 2.25 mm for sliding door shutter frames capable of mounting
single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum
thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5
mm thick clear float glass of reputed make duly fixed with EPDM weathering seal resistant accessories
like clipping locking system made of aluminium 1 No., per set of sashes and the system is to be installed
at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including
cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with
templates for casement sizing complete for finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding doors three track - two glass
shutters sliding and one mesh shutter sliding- 95 -Series duly manufactured using UPVC
reinforced profiles of 95.50 mm x 60 mm x 2.25 mm for outer frames, 66 mm x 42 mm x 2.25 mm for
sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip
galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion
welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh
shutter shall be made of 50 x 26.5 x 2.0 mm uPVC profile section and fitted with nylon/polymer mesh and
rollers/pulley duly fixed with EPDM weathering seal resistant accessories like clipping locking system
made of aluminium 1 No., per set of sashes and the system is to be installed at the site using anchor
fasteners, silicon rubber sealant, easy glazing/ deglazing at site
etc.,
including
cost
and
conveyance of all materials, accessories, labour charges for transportation, erection at site with
templates for casement sizing complete for finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding doors three track - three glass
shutters sliding - 112 -Series duly manufactured using UPVC reinforced profiles of 112.0 mm x 60 mm x
2.25 mm for outer frames, 66 mm x 42 mm x 2.25 mm for sliding door shutter frames capable of mounting
single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum
thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5
mm thick clear float glass of reputed make and fixed with EPDM weathering seal resistant accessories
like clipping locking system made of aluminium 1 No., per set of sashes and the system is to be installed
at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including
cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with
templates for casement sizing complete for finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) openable doors with openable shutters 106-Series duly manufactured using UPVC reinforced profiles of 60 mm x 56 mm x 2.25 mm for outer
frames, 70 mm x 60 mm x 2.25 mm for mullion sections as per the need and 106 mm x 60 mm x 2.25 mm
for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip
galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion
welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with
EPDM weathering seal resistant and accessories for openable door - hinges of stainless steel grade
304- 3 Nos., per shutter handle with mazak alloy casting 1 No. per shutter, locking system suitably
concealed 1 No., with raiser wedges for smooth operation and the system is to be installed at the site
using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and
conveyance of all materials, accessories, labour charges for transportation, erection at site with templates
for casement sizing complete for finished item of work

Supplying and fixing door shutter, with shutter frame and infill panel made from PVC material conforming
to IS: 10151-1982, the shutter frame made out of PVC extruded sections having overall dimension of 47
mm x 33 mm with wall thickness of 1.2mm + 0.3mm with usual process variation, the shutter frame
with tapered shape to provide better grip to the infill panel end to drain out the water The Infill panel is
made out of PVC Sections having Overall Dimensions of 200 mm x 20 mm with wall thickness of 1mm +
0.2mm, the shutter frames mitre cut and joined at the corner, by providing Polymeric L type corners to
take hardware & fixtures fixed with 10-20mm counter sunk fully threaded parallel shank steel screws, all
the hardware locations reinforced with special polymeric bars as per drawings, stickers showing locations
of different hardware pasted on the shutter, the infill panels joined by tongue and groove method.

PVC Door shutter conforming to IS: 10151-1982, the infill panel made of seamless one piece multi
chamber PVC extruded sections having overall dimensions of 610 mm x 20 mm with wall thickness of
1mm + 0.2mm with the top and bottom edges of the shutter covered with end cap of the size 20 mm x 11
mm with the door shutter to be reinforced with special polymeric reinforcements as per drawing for
hardwares and fixtures. Stickers indicating the locations of hardware will be pasted at appropriate places.

Providing & Fixing of Scientific Doors with metal door frames and door shutters made of galvanize steel
(base steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM)
pure polyester powder upto 50-60 microns thick, outer frame section of 100 x 58 mm x 1.2 mm thick,
shutter section of 0.80 mm thick galvanized steel sheet pressed (roll formed) for 46mm thick fully
flush, double skin door shell seam joints at stile edges, in-fill of honeycomb kraft paper used to give the
required rigidity and effective acoustic insulation with 6 Tower bolt 1 No., 6 D handles 2 Nos., 10
Aldrop 1 No., Butt Hinges 3 Nos, Mortise Lock of approved quality 1 No, frames fixed to the
concrete/masonry wall by means of self expanding screws complete for finished item of work for
Single leaf Door

Providing & Fixing of Scientific Doors with metal door frames and door shutters made of galvanize steel
(base steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM)
pure polyester powder upto 50-60 microns thick, outer frame section of 100 x 58 mm x 1.2 mm thick,
shutter section of 0.80 mm thick galvanized steel sheet pressed (roll formed) for 46mm thick fully
flush, double skin door shell seam joints at stile edges, in-fill of honeycomb kraft paper used to give the
required rigidity and effective acoustic insulation with 6 Tower bolt 2 Nos., 6 D handles 2 Nos., 10
Aldrop 1 No., Butt Hinges 6 Nos, Mortise Lock of approved quality 1 No, frames fixed to the
concrete/masonry wall by means of self expanding screws complete for finished item of work for Double
leaf Door

Moulded panel solid core flush doors using water-resistant hardwood fibre HDF / MDF fibre
boards skins of 2.5 mm thick of Masonite or equivalent doors - 30 mm thick
Moulded panel solid core flush doors using water-resistant hardwood fibre HDF / MDF fibre boards skins
of 2.5 mm thick Masonite or equivalent doors - 35 mm thick
Solid core membrane flush doors using rigid PVC membrane of 0.3 mm thick of different elegant shades
doors - 30 mm thick
Solid core membrane flush doors using rigid PVC membrane of 0.3 mm thick of different elegant shades
doors - 35 mm thick
Providing & fixing 30 mm thick solid panel PVC door shutter consisting of frame made out of 19
guage M.S tube of 19 x 19 mm for stiles, top & bottom rail, with a coat of primer of approved make.
M.S. Frame covered with 5 mm thick heat moulded PVC C channel of size of 30 x 50 mm forming
stiles, 5 mm thick 75 mm wide PVC sheet for top, lock & bottom rail on either side 20 mm wide cross
PVC sheet as gap insert for top & bottom rail, panelling of 10mm(+/-)( 5mm+5mm) thick PVC sheet fitted
in the M.S. frame welded /sealed to the stiles, on either side joined together with solvent cement adhesive
etc., additional 5 mm thick PVC strip of 20 mm width stuck on the interior side of the C channel
using solvent cement, complete as per direction of Engineerincharge, manufacturers specification.

Supply & Fixing SOLID STEEL DOOR door shutter made out of G I Precoated Sheet with an average wall
thickness of 0.35 mm on both sides. MS Tube having dimensions of 19 x 19 mm is inserted along the
hinge side of the door, core of the door shutter filled with High Density Polyurethane foam injected with the
help of hydraulic injection method, four sides of the door covered with G I Precoated Sheet and the
hardware locations reinforced with suitable wooden blocks as per drawing and stickers indicating location
of the hardware pasted at appropriate places, etc complete

Supplying & fixing SINGLE PANEL 30 mm thick PVC DOOR, door shutters with shutter frame and Infill
panel made from PVC material, the shutter frame made out of PVC extruded sections having overall
dimensions of 6 0mm x 30 mm with wall thickness of 1.3 mm 0.3 mm, with the Infill panel made out of
multi chambered seamless hollow PVC extruded panel having overall dimensions of 610 mm x 20 mm
having wall thickness 1 mm 0.2 mm with the shutter frame meter cut and joined at corners and all the
hardware locations reinforced with special polymeric bars as per drawing including providing special PVC
braket on hinge side, etc complete

deleted
Providing & Fixing "RAJSHRI" or Equivalent factory made Internal PRELAM PVC door frame of size 100 x
45mm with a wall thickness of 5mm, made out of extruded 5mm Prelam PVC foam sheet. Mitred cut at
two corners and joined with two nos. of 150mm long brackets of 15 x 15mm MS square tube. The two
vertical door profiles are to be reinforced with 40 x 20 MS Tube of 19 guage throughout the frame. The
door frame shall be fixed to the wall using 65/100mm long MS screws through the frame by using PVC
fasteners. A minimum of 3 nos of screws to be provided for each vertical member and two nos. for
horizontal. Complete as per the manufacturers specification and drawing and direction of
Engineer in Charge

Supply & Fixing of Powder Coated Mild Steel doors, frames & shutters made of Skin pass
galvanized Iron sheet conforming to Base Steel as per IS 513 D Quality, Galvanized as per IS 277
with Hot Zinc Coating of 120 grams / Sq.Mtr with powder coating of thickness 60-65
Microns, frame with 1.2mm thick Skin pass Galvanized Iron sheet formed to single rebate profile
of size 100 mm X 58 mm and filled with in-fill Polyurethane foam, the Door Shutters are with
0.80 mm thick Skin pass Galvanized Iron Sheet formed to provide a 46 mm thick fully flush,
double skin door shell with Lock Seam joints at stile edges, fitted with in-fill of Honeycomb Kraft
Paper and coated with polyester powders of Pure polyester/ epoxy polyester or polyurethane
powder for powder coating of thickness 60 65 microns and are coated with Zinc Phosphate Primer
to receive any paint on site or finished with Thermosetting Polyurethane paint
of Aliphatic
Grade providing high levels of scratch resistance and durability, the Shutter provided with 6 MM
clear float vision glass in Circular, Square or Rectangular shapes, Stainless Steel Ball Bearing
Butt Hinges 3 mm thick fixed flush to the frame and shutter (Profile 102x76x3mm thick).Mortise
Sash Lock with Lever Handles, Mortise Dead Bolt, etc for industrial, commercial, residential,
clean room applications

Supply & Fixing of Stainless steel doors, frames & shutters made of stainless steel grade 304
of hairline finish, frame with 1.2mm thick formed to single rebate profile of size 100 mm X 58 mm
and filled with in-fill Polyurethane foam, the Door Shutters are with 0.80 mm thick Stainless steel
Sheet formed to provide a 46 mm thick fully flush, double skin door shell with Lock Seam joints at
stile edges, fitted with in-fill of Honeycomb Kraft Paper, the Shutter provided with 6 MM clear float
vision glass in Circular, Square or Rectangular shapes, Stainless Steel Ball Bearing Butt Hinges
3 mm thick fixed flush to the frame and shutter (Profile 102x76x3mm thick).Mortise Sash Lock with
Lever Handles, Mortise Dead Bolt, etc for industrial, commercial, residential, clean room
applications

Supply & Fixing of Powder Coated Fire Rated doors, frames & shutters made of Skin pass
galvanized Iron sheet conforming to Base Steel as per IS 513 D Quality, Galvanized as per IS 277
with Hot Zinc Coating of 120 grams / Sq.Mtr with powder coating of thickness 60-65
Microns, frame with 1.2mm thick Skin pass Galvanized Iron sheet formed to double rebate
profile of size 143 mm X 58 mm with maximum bending radius of 1.4 mm and filled with in-fill
Polyurethane foam, the Door Shutters are with 0.80 mm thick Skin pass Galvanized Iron
Sheet formed to provide a 46 mm thick fully flush, double skin door shell with Lock Seam joints at
stile edges, fitted with in-fill of Honeycomb Kraft Paper and coated with polyester powders of Pure
polyester/ epoxy polyester or polyurethane powder for powder coating of thickness 60 65 microns
and are coated with Zinc Phosphate Primer to receive any paint on site or finished with
Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and
durability, the Shutter provided with 6 MM clear float vision glass in Circular, Square or
Rectangular shapes, Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed flush to the
frame and shutter (Profile 102x76x3mm thick).Mortise Sash Lock with Lever Handles, Mortise
Dead Bolt, etc for 120 minutes Fire Rated door conforming to IS:3614 (Part2) 1992

Supply & Fixing of Powder Coated Fire Rated doors, frames & shutters made of Skin pass
galvanized Iron sheet conforming to Base Steel as per IS 513 D Quality, Galvanized as per IS 277
with Hot Zinc Coating of 120 grams / Sq.Mtr with powder coating of thickness 60-65
Microns, frame with 1.2mm thick Skin pass Galvanized Iron sheet formed to double rebate
profile of size 143 mm X 58 mm with maximum bending radius of 1.4 mm and filled with in-fill
Polyurethane foam, the Door Shutters are with 0.80 mm thick Skin pass Galvanized Iron
Sheet formed to provide a 46 mm thick fully flush, double skin door shell with Lock Seam joints at
stile edges, fitted with in-fill of Honeycomb Kraft Paper and coated with polyester powders of Pure
polyester/ epoxy polyester or polyurethane powder for powder coating of thickness 60 65 microns
and are coated with Zinc Phosphate Primer to receive any paint on site or finished with
Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and
durability, the Shutter provided with 6 MM clear float vision glass in Circular, Square or
Rectangular shapes, Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed flush to the
frame and shutter (Profile 102x76x3mm thick).Mortise Sash Lock with Lever Handles, Mortise
Dead Bolt, etc for 60 minutes Fire Rated door conforming to IS:3614 (Part2) 1992

Supply & Fixing of Stainless steel Fire Rated doors, frames & shutters made of Stainless steel
of 304 grade hairline finish, frame with 1.2mm thick Stainless steel of 304 grade hairline finish
sheet formed to double rebate profile of size 143 mm X 58 mm with maximum bending radius of 1.4
mm and filled with in-fill Polyurethane foam, the Door Shutters are with 0.80 mm thick Stainless
steel of 304 grade hairline finish Sheet formed to provide a 46 mm thick fully flush, double skin door
shell with Lock Seam joints at stile edges, fitted with in-fill of Honeycomb Kraft Paper and coated
with polyester
powders of Pure polyester/ epoxy polyester or polyurethane powder for powder
coating of thickness 60 65 microns and are coated with Zinc Phosphate Primer to receive any
paint on site or finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high
levels of scratch resistance and durability, the Shutter provided with 6 MM clear float vision glass
in Circular, Square or Rectangular shapes, Stainless Steel Ball Bearing Butt Hinges 3 mm thick
fixed flush to the frame and shutter (Profile 102x76x3mm thick).Mortise Sash Lock with
Lever Handles,
Mortise Dead Bolt, etc for 120 minutes Fire Rated door conforming to IS:3614 (Part2) 1992

Supply & Fixing of Stainless steel Fire Rated doors, frames & shutters made of Stainless steel
of 304 grade hairline finish, frame with 1.2mm thick Stainless steel of 304 grade hairline finish
sheet formed to double rebate profile of size 143 mm X 58 mm with maximum bending radius of 1.4
mm and filled with in-fill Polyurethane foam, the Door Shutters are with 0.80 mm thick Stainless
steel of 304 grade hairline finish Sheet formed to provide a 46 mm thick fully flush, double skin door
shell with Lock Seam joints at stile edges, fitted with in-fill of Honeycomb Kraft Paper and coated
with polyester powders of Pure polyester/ epoxy polyester or polyurethane powder for powder coating
of thickness 60 65 microns and are coated with Zinc Phosphate Primer to receive any paint on site
or finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch
resistance and durability, the Shutter provided with 6 MM clear float vision glass in Circular, Square
or Rectangular shapes, Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed flush to the
frame and shutter (Profile 102x76x3mm thick).Mortise Sash Lock with Lever Handles,
Mortise Dead Bolt, etc for 60 minutes Fire Rated door conforming to IS:3614 (Part2) 1992

Supply & Fixing of Lead Lined Clean room doors frames and shutters made of Skin pass
galvanized Iron sheet (Conform to Base Steel as per IS 513 D Quality, Galvanized as per IS 277
with Hot Zinc Coating of 120 grams / Sq.Mtr).with powder coating of thickness 60-65
Microns, frame of 1.60mm thick galvanized steel sheet (Conform to IS 277) formed to
Single/double rebate profile of size 100mm X 58mm / 143x58mm, door frames with a single /
multi Layer of Lead sheet varying thickness from 3mm /1mm to 2mm depends on radiation
level, the shutter with 1.2 mm thick Galvanized Steel Sheet (Conform to IS 277) formed to provide a
46mm thick fully flush, double skin door shell with Lock Seam joints at stile edges with a
single / multi Layer of Lead sheet varying thickness from 3mm /1mm to 2mm depends on
radiation level, the lead sheets extend the full width and height of the door, Lead thickness is
equal to the shielding in the adjacent wall, the door frames and door shutters are coated
with polyester
powders of Pure polyester/ epoxy polyester or polyurethane powder for
powder coating of thickness 60 65 microns, coated with Zinc Phosphate Primer to receive
any paint on site or finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high
levels of scratch resistance and durability, hardware with Stainless Steel Ball Bearing Butt Hinges
3 mm thick fixed flush to the frame and shutter etc complete for finished item

Supply & Fixing of Lead Lined Stainless steel Clean room door frames and shutters made of
Stainless
steel grade of 304 hairline finish, frame with 1.60mm (16SWG) thick hairline finish Stainless steel grade of 304
formed to Single/double rebate profile of size 100 mm x 58mm/ 143 x 58 mm, door frames with a single /
multi Layer of Lead sheet varying thickness from 3mm /1mm to 2mm depends on radiation level, the shutter
with 1.2 mm thick hairline finish Stainless steel grade of 304 formed to provide a 46mm thick fully flush,
double skin door shell with Lock Seam joints at stile edges with a single / multi Layer of Lead sheet varying
thickness from 3mm /1mm to 2mm depends on radiation level. The lead sheets extend the full width and
height of the door. Lead thickness is to be equal to the shielding in the adjacent wall. Hardware can be
provided with Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed flush to the frame and shutter etc
complete for finished item of work

Supply and fixing of V- BOARD (conforming to IS 14862) door shutter with all- round style U
lipping size 15 x 18 x 15 mm made from 0.8 mm thick powder coated cold rolled steel
profiles with 16 mm thick V-BOARD with necessary screws fixed at 1-0 interval 250 mm
long Aldrops 2 nos. M.S. nickel coated 250 mm long 1 no. M.S. Tower Bolts Including cost and
conveyance of all materials at site and applying 1 coat of primer, 2 coats of luppum and 2
coats of synthetic enamel paint as per approved design for finished item of work.

Supply and fixing of V- BOARD (conforming to IS 14862) 12 mm thick door shutter of size 60 x 26 with allround style U lipping size 15 x 14 x 15 mm made from 0.8 mm thick powder coated cold rolled steel profiles
with necessary screws fixed at 1-0 interval 250 mm long Aldrops 2 nos. M.S. nickel coated 250 mm long
1 no. M.S. Tower Bolts Including cost and conveyance of all materials at site and applying 1 coat
of primer, 2 coats of luppum and 2 coats of synthetic enamel paint as per approved design for finished item of
work.

Providing and fixing frame made from 1.2 mm powder coated cold rolled steel profiles of overall section size
of 60 mm x 45 mm with 21 mm rivet for shutter with necessary stiffeners hinges and screws. V- BOARD
(IS 14862) shutter with all-round style U lipping of size 15 x 18 x 15 mm made from 0.8 mm thick CRCA
powder coated steel profile with 16 mm thick V- board with necessary screws fixed at every 1-0 interval
250 mm long Aldrops 2 nos. M.S. nickel coated 250 mm long 1 no. M.S. Tower Bolts Including cost and
conveyance. One coat of primer, 2 coats of luppum and 2 coats of synthetic enamel paint as per approved
colour, labour charges etc.

Providing, supplying & fixing of glazed 2 Track -2 Panel Sliding Door made out of multi chambered uPVC
sections with TPV gaskets
having
isolated
drainage
and
reinforced with Galvanized Iron profiles
throughout the window. The sliding outer frame having a overall size of 60 x 45 mm with
reinforcement of 1 mm thickness, super sash with overall size of 39 x 75 mm with reinforcement of 1.5 mm
thickness. Glazing bead for fixing of glass shall be of size 20 x 18mm and coextruded with gasket.
Fibre Glass mesh shall be provided in mesh shutter. Window/Door shall be provided with 6 mm plain float glass,
standard hardware & multi point locking system of Patio espagnolette. Wall thickness of frame & sash shall be
2.0 mm

WINDOWS
BISON LAM (Pre Laminated Cement Bonded Particle Board) WINDOWS with Pre-Painted Steel Sections
- Supply and fixing of factory made windows fabricated from pre-painted Cold rolled formed sections
made of galvanized steel colour coated sections (Base steel as per IS-512 D quality, galvanized as per IS277 with Zinc of 120 gram/sqm) with total coated thickness of 0.6mm primer coated with epoxy primer of
5-7 microns thick, finish painted with polyester paint of 12-16 microns and back coated with alkyd backer
of 5-7 microns), the sections for outer frame and centre mullion (duly filled with PU form of 40 kg/Cum)
should be of 60mm X 50mm, with provision for fixing glazed shutter. The section for glazed/panelled
shutter should be of size 47mm x 20mm and another section of size 60mm x 23 mm should be provided
for separating glazed and panelled portion. The section are cut to length and miter jointed with plastic
corner brackets. The size of the corner brackets for a window outer frames 50mm x 60mm. the mullion
section is to be fixed to the frame with plastic mullion cap.SZS 1. Stiffener plates of size 60mmx50mm
made of 1.25mm thick CRCA electroplated are to be provided to fix window frames to concrete/masonry.
Gasket is to be provided for fixing glass. 10mm BISON LAM both sides. 5mm thick colour pin headed
glass is to be provided for glazing and providing guard bars of 10mm square rods duly welded at 100mm
pitch to MS flat section of size 18mm and 3 mm thick. Windows are to be fixed to wall by means of self
expansion nylon cap(75) and electroplated wooden screws of size 100mm, together with the following
(Supply and fixing) aluminium powder coated fittings A) 75mm long grip handles 1 no per shutter. B)
75mm long tower bolts 2 nos. per shutter. C) Heavy duty SS pivot hinges 2nos per shutter. D) MS Powder
coated telescopic stay 1 no per shutter.

Pre Laminated Cement Bonded Particle Board WINDOWS Single shutter 20x40
section size of 50mm x 60mm shutter frame section size of 48mm x 25mm

outer

frame

Pre Laminated Cement Bonded Particle Board WINDOWS Double shutter 30 x 40 outer frame
section size of 50mm x 60mm shutter frame section size of 48mm x 25mm mullion section size of 50mm
x 60mm for outer frame
Pre Laminated Cement Bonded Particle Board WINDOWS Double shutter 30 x 30 outer frame
section size of 50mm x 60mm shutter frame section size of 48mm x 25mm Mullion section size of 50mm
x 60mm for outer frame.
Pre Laminated Cement Bonded Particle Board WINDOWS Double shutter 40x40 outer frame
section size of 50mm x 60mm shutter frame section size of 48mm x 25mm Mullion section size of
50mm x 60mm for outer frame.
Pre Laminated Cement Bonded Particle Board WINDOWS Center fixed both side openable shutters
60x40 outer frame section size 50 mm x 60 mm shutter frame section size of 48mm x 25mm, Mullion
section size of 50mm x 60mm fixed beading section size of 12mm x 12mm.
Supply and fixing of openable window made out of extruded PVC section and the outer frame having
overall dimensions of 40 x 48 mm with a wall thickness of 1.5 mm and the shutter frame with overall
dimensions of 26 x 47 mm and wall thickness of 1.2mm 0.3mm provided with 5mm glazing, the centre
mullion having over all dimensions of 25 x 32.5mm 0.3mm, complete, for finished item of work.

Supply and fixing of two track or three track sliding window with the outer frame of 58 x 45mm with a wall
thickness of 1.2mm 0.3mm and the sliding shutter frame made of PVC section 57 x 32mm with overall
dimensions of 1.5mm 0.3mm provided with 5mm glazing including roller bearings and arrestor type
handle cum lock complete, for finished item of work.

NCL or equivalent PRE- PAINTED STEEL, WINDOWS, VENTILATORS & DOOR FRAMES. Supply and
fixing of windows & top Hung and fixed louvered ventilators made of pre - painted steel (base steel as per
IS 513 of -0.6 mm thick 'D" quality, galvanized as per IS 277 with zinc of 120 GSM) primer coated with
epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back
coated with 5-7 microns thick alkyd backer. Section for outer frame should be 46 x 52 mm section for
shutter should be 46 x 46 mm section for mullion should be 46 x 70 mm, and section for beading should
be 18 x 25 mm and section for louvered ventilation should be 33 x57mm Box section. The windows
should be panelled with 5mm thick plain float glass & 4 mm pinhead glass for ventilators with Ethyl
propylene Diamine monomer Gasket (EPDM). The sections are to be cut to length mitre joined with corner
brocket centre mullions are to be fixed using mullion cap. Handle made of high grade aluminium powder
coated and nylon receiver. Gaskets made of Ethyl propylene Diamine monomer (EPDM). Corner brackets
made of CRCA with Zinc Phosphate. Mullion caps made of glass filled nylon. The above frames should be
fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard
bars with 6" pitch complete for finished item of work.

Windows: Single shutter 2'0 x 4'0 (609.6 x 1219.2 mm ) Outer frame section size of 46 x 52 mm
shutter frame section size of 46 x 46 mm
Windows: Double shutter 3'-0" x 4'-0" (914.4mm x 1219.2 mm) outer frame section size of 46 x 52
mm shutter frame section size of 46 x 46 mm
Windows: Double shutter 3'-0" x 4'-0" (914.4mm x 1219.2 mm) outer frame section size of 46 x 52
mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm
Windows: Double shutter 4'-0" x 4 '-0" (1219.2x12.19.2mm) outer frame section size of 46 x 52 mm
shutter frame section size of 46 x 46 mm
Windows: Double shutter 4'-0" x 4 '-0" (1219.2x1219.2mm) outer frame section size of 46 x 52 mm
shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm
Windows: Double shutter 4'-6" x 4 '-6" (1371.6x1371.6mm) outer frame section size of 46 x 52 mm
shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm
Windows: Centre fixed both side openable shutter
5'-0" x 4'-0" 1524x1219.2mm) outer frame
section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm
fixed beading section size of 18 x 25 mm
Windows: Centre fixed both side openable shutter 6'-0" x 4'-0" (1828.8x1219.2mm) outer frame
section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70
mm fixed beading section size of 18 x 25 mm
Windows: Centre fixed both side openable shutter 6'-0" x 4'-6" (1828.8x1371.6mm) outer frame
section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70
mm fixed beading section size of 18 x 25 mm
Ventilators: Top Hung 2 '-0" x 2'-0" (609.6x609.6mm) outer frame section size of 46mm x 52 mm
shutter frame section size of 46mm x 46 mm
Ventilators: Top Hung 4 '-0" x 2'-0" (1219.2x609.6mm) outer frame section size of 46 x 52 m
shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm
Ventilators: Top Hung 4 '-0" x 3'-0" (1219.2x914.4mm) outer frame section size of 46 x 52m m
shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm
Ventilators: Fixed louvers 2'-0" x 2'-0" ( 609.6x609.6mm ) (Box section) outer frame section size of
33 x 57 mm

Ventilators: Fixed louvers 4'-0" x 2'-0" (1219.2x609.6mm) (Box section) outer frame section size of
33 x 57 mm Mullion section size of 33 x 57
Ventilators: Fixed louvers 4'-0" x 3'-0" (1219.2x914.4mm) (Box section) outer frame section size
of 33 x 57 mm Mullion section size of 33 x 57
NCL or equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH
GRILL PROVISION) Providing and Fixing of windows made of pre-painted steel (Base steel as per IS 513
of 0.6mm thick galvanized as per IS 277 with Zinc of 120 GSM). Primer coated with epoxy primer of 5-7
microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7
microns thick alkyd backer. Section for outer frame should be of 48x50mm, centre mullion should be of
48x50mm, section for shutter should be of 47x20mm Outer frame and mullions to have rebate for Glazed
shutter and a 20mm provision for Guard bars/Grills. The sections are to be cut to length metre joined with
corner bracket. Centre mullion is to be fixed with mullion cap. Seccolor Handle, seccolor stay, 2 nos. of
Stainless Steel heavy duty Pivot hinges shall be provided per shutter. The windows should be panelled
with 5mm thick plain float glass. Rubber Gaskets are provided all around the glass. The above frames
should be fixed to the concrete/masonry wall by means of self expanding screws, Including 10mm Square
guard bars with 6 (152.4mm) pitch etc., complete for finished item of work.

Single shutter Window 20x40 (609.6mm x 1219.2mm). Outer frame section size of 48x50mm
shutter frame section size of 47x20mm.
Double shutter Window with vertical mullion 30 x 40 ( 914.4mm x 1219.2mm) outer frame
section size of 48x50mm shutter frame section size of 47x20mm. Mullion section size of 48x50mm.
Double shutter Window with vertical member40 x 40 (1219.2mm x 1219.2mm ) outer frame
section size of 48x50mm shutter frame section size of 47x20mm and mullion section should be of
48x50mm.
Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame
section size of 48x50mm. Shutter frame section size of 47x20mm. Mullion section size of 48x50mm.
Fixed beading section size of 12x12mm.
Centre fixed both side openable shutter window 60 x 40 (1828.8mm x1219.2mm). Outer
frame section size of 48x50mm. Shutter frame section size of 47x20mm.
Mullion section size of
48x50mm. Fixed beading section size of 12x12mm.
NCL or equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH
GRILL & FLYMESH PROVISION) Providing & Fixing of windows made of pre-painted steel (Base Steel as
per IS 513 of 0.6mm thick galvanized as per IS 277 with zinc of 150 GSM). Primer coated with epoxy
primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated
with 5-7 microns thick alkyd backer. Section for outer frame should be of 72x55mm, centre mullion should
be of 72x50mm, Section for fixed glass beading section should be of 12x12mm and section for shutters
should be of 47x20mm. Outer frame & mullion sections to have rebate for glazed shutters, fly mesh and a
20mm provision for guard bars/grills. Fly mesh shutter section should be of 20x40mm. The sections are
to be cut to length metre joined with corner bracket. Centre mullions are to be fixed with mullion cap,
seccolor stay, seccolor handles, seccolor latch 2 Nos of heavy duty stainless steel pivot hinges shall be
provided per Shutter. The windows should be panelled with 5mm thick plain float glass and S.S. Mesh for
fly mesh shutter(304 grade). Rubber Gaskets are provided all around the glass. The above frames
should be fixed to the concrete/masonry wall by means of self expanding screws. Including 10mm
Square guard bars with 6 (152.4mm) pitch , complete for finished item of work

Single shutter Window 20x40 (609.6mm x 1219.2mm).


shutter frame section size of 47x20mm.

Outer frame section size of 72x50mm

Double shutter Window with vertical mullion 30 x 40 (914.4mm x 1219.2mm) outer frame section
size of 72x50mm shutter frame section size of 47x20mm. Mullion section size of 72x50mm.
Double shutter Window with vertical member40 x 40 (1219.2mm x 1219.2mm) outer frame section size
of 72x50mm shutter frame section size of 47x20mm and mullion section should be of 72x50mm.
Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section
size of 72x50mm. Shutter frame section size of 47x20mm. Mullion section size of 72x50mm. Fixed
beading section size of 12x12mm.
Centre fixed both side openable shutter window 60x40 (1828.8mm x1219.2mm). Outer frame section
size of 72x50mm. Shutter frame section size of 47x20mm. Mullion section size of 72x50mm. Fixed
beading section size of 12x12mm.
Providing and Fixing Pre-painted steel Sliding Window fabricated from Roll formed sections made of
galvanized Steel colour coated/powder coated (Base Steel as per IS 513 D quality, galvanized as per IS
277 with zinc of 120 GM/Sq.mtr) with total coated thickness of 0.60 mm, primer coat with epoxy primer of
5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with
Alkyd backer of 5-7 microns or powder coated with pure polyester powder up to 50-60 microns thick and
the section for external frame bottom of 79 x 44 mm, external frame sides and top of 69 x 24 mm, guide
for top and bottom of 69 x 26 mm (Stainless Steel) and section for shutter of 26 x 30 mm and panelled
with 5mm thick plain float glass fitted with corner bracket for internal and external frame made of glass
filled nylon, gaskets made of Ethyl Propylene Diamine Monomer (EPDM), sections cut to length, joined
and assembled by means of corner bracket, including fixing windows in the concrete/masonry walls by
means of self expanding brackets & screws including 10mm square guard bars with 6 pitch
(152.4mm) and all taxes etc., complete for finished item of work

deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted
deleted

deleted
deleted
deleted
deleted
Supply & fixing of fly mesh shutters of size 20x40mm fly proof mesh with std. Spn (S.S) fly mesh including
cost and conveyance of all materials, and labour charges etc. Complete for finished item of work including
of all taxes. : Single shutter 2-0 x 4-0 ( 609.6 x 1219.2mm) Shutter section size 20 x 40mm
Supply & fixing of fly mesh shutters of size 20x40mm fly proof mesh with std. Spn (S.S) fly mesh including
cost and conveyance of all materials, and labour charges etc. Complete for finished item of work including
of all taxes. Double shutter 3-0 x 4-0 (914.4 x 1219.2mm) shutter section size 20 x 40mm
Supply & fixing of fly mesh shutters of size 20x40mm fly proof mesh with std. Spn (S.S) fly mesh including
cost and conveyance of all materials, and labour charges etc. Complete for finished item of work including
of all taxes. Double shutter 4-0 x 4-0 (1219.2 x 1219.2mm) shutter section size 20 x 40mm
Supply & fixing of fly mesh shutters of size 20 x 40 mm fly proof mesh with Netlon fly mesh including cost
and conveyance of all materials, and labour charges etc. complete for finished item of work including of all
taxes. Single shutter 2-0 x 4-0 (609.6 x 1219.2mm) shutter section size 20 x 40mm
Supply & fixing of fly mesh shutters of size 20 x 40 mm fly proof mesh with Netlon fly mesh including cost
and conveyance of all materials, and labour charges etc. complete for finished item of work including of all
taxes. Double shutter 3-0 x 4= 0 ( 914.4 x 1219.2mm) shutter section size 20 x 40 mm
Supply & fixing of fly mesh shutters of size 20 x 40 mm fly proof mesh with Netlon fly mesh including cost
and conveyance of all materials, and labour charges etc. complete for finished item of work including of all
taxes. Double shutter 4-0 x 4-0 (1219.2 x 1219.2 mm) shutter section size 20 x 40 mm
Supply and fixing fly mesh window with sections made of pre painted steel (Base steel as per IS
513 of D quality, Galvanized as per IS 277 with zink of 120 GSM), primer coated with epoxy primer of 5-7
microns thick, finish painted with a polyester paint of 12 to 16 microns thick and back coated with 5-7
microns thick alkyd baker with total coated thick ness of 0.58 mm for shutter frame and 0.8 for outer
frame, the section for outer frame of 30 x 30 mm and fly mesh shutter section of 20 x 40mm outer frame
sections with rebate for fly mesh shutters and sections cut to lengh metre jointed with corner bracket and
fitted with aluminum T section of double shutter & above, SS fly mesh shutter (304 grade) and EPD
gasket including fixing the frames in the concrete/ masonry wall by means of left expending screws, latch,
2 nos of heavy duty GI pivot hinges provided per shutter (304 grade) including all taxes complete for
finished item of work.

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows two track sliding - 62Series duly manufactured using UPVC reinforced profiles of 62 mm x 60 mm x 2.25 mm for outer
frames, 66 mm x 38 mm x 2.25 mm for sliding shutter frames capable of mounting single glazing
system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of
1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm
thick clear float glass of reputed make duly fixed with EPDM weathering seal resistant accessories like
clipping locking system made of aluminium 1 No., per set of sashes and the system is to be installed at
the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including
cost and conveyance of all materials, accessories, labour charges for transportation, erection at site
with templates for casement sizing complete for finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows three track - only two
glass shutters sliding - 80- Series duly manufactured using UPVC reinforced profiles of 80 mm x 52 mm x
2.25 mm for outer frames, 54 mm x 38 mm x 2.25 mm for sliding shutter frames capable of mounting
single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum
thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5
mm thick clear float glass of reputed make duly fixed with EPDM weathering seal resistant accessories
like clipping locking system made of aluminium 1 No., per set of sashes and the system is to be installed
at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including
cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with
templates for casement sizing complete for finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) sliding windows three track - two glass
shutters sliding and one mesh shutter - 80-Series duly manufactured using UPVC reinforced profiles of 80
mm x 52 mm x 2.25 mm for outer frames, 54 mm x 38 mm x 2.25 mm for sliding shutter frames capable
of mounting single glazing system structurally reinforced with hot dip galvanized up to 50
microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window
sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be 52
mm x 21.5 mm x 2 mm fitted with nylon/ polymer mesh on rollers/ pulley duly fixed with EPDM
weathering seal resistant accessories like clipping locking system made of aluminium 1 No., per set of
sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy
glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges
for transportation, erection at site with templates for casement sizing complete for finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters 48-Series duly manufactured using UPVC reinforced profiles of 48 mm x 60 mm x 2.25 mm for outer
frames, 64 mm x 60 mm x 2.25 mm for mullion sections for two or more openable shutters and 78 mm x
60 mm x 2.25 mm for outward openable shutter frame or 70 mm x 60 mm x 2.25 mm for inward openable
shutter frame capable of mounting single glazing system structurally reinforced with hot dip
galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion
welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with
EPDM weathering seal resistant accessories for casement window - friction stay hinges of stainless
steel grade 304- 2 Nos., per sash, handle with mazak alloy casting 1 No. per sash, multipoint locking
system suitably concealed 1 No., per sash provided with raiser wedges for smooth operation and the
system is to be installed at the site using anchor fasteners, silicon rubber sealant,
easy glazing/
deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for
transportation, erection at site with templates for casement sizing complete for finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters 60 -Series duly manufactured using UPVC reinforced profiles of 60 mm x 56 mm x 2.25 mm for outer
frames, 70 mm x 60 mm x 2.25 mm for mullion sections for two or more openable shutters 70 mm x 60
mm x 2.25 mm for openable shutter frame capable of mounting single glazing system structurally
reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated &
welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed
make duly fixed with EPDM weathering seal resistant and accessories for casement window - friction
stay hinges of stainless steel grade 304- 2 Nos., per sash, handle with mazak alloy casting 1 No. per
sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges for
smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber
sealant,
easy glazing/ deglazing at site etc., including cost and conveyance of all materials,
accessories, labour charges for transportation, erection at site with templates for casement sizing
complete for finished item of work

DELETED
DELETED
Galvanized powder coated Casement Windows with openable shutters duly manufactured using
pressed steel sections in mild steel conforming to IS 513 of having 1.0 mm thick and galvanized as per IS
277 of 120 GSM surface treatment with pure polyester powder coating of 30-40 microns thick and section
for outer frame of 60x50mm, centre for mullion of 62x50mm, section for shutter of 52 x 22 mm, outer
frame and mullions to have one side rebate for glazed shutter of size 24 mm and 10x10 mm square guard
bars provided at 125 mm c/c the sections assembled with bolt & nut assembly with zinc-electroplated M-5
bolts, GI Handle of size 80 mm x 15 mm -1 No per shutter, 2 nos of stainless steel heavy duty pivot hinges
of size 3" of SS 304 Grade per shutter, window panes with 5 mm thick plain float glass and fixed with
glass beading section of 10x12 mm size with 0.8 mm thick powder coated aluminium 'U' channel and
window frames fixing to the concrete/masonry wall arrangement with self expanding screws, complete for
finished item of work including of all taxes - 1220 x 1372 or below size

Galvanized powder coated Casement Windows with openable shutters duly manufactured using
pressed steel sections in mild steel conforming to IS 513 of having 1.0 mm thick and galvanized as per IS
277 of 120 GSM surface treatment with pure polyester powder coating of 30-40 microns thick and section
for outer frame of 60x50mm, centre for mullion of 62x50mm, section for shutter of 52 x 22 mm, outer
frame and mullions to have one side rebate for glazed shutter of size 24 mm and 10x10 mm square guard
bars provided at 125 mm c/c the sections assembled with bolt & nut assembly with zinc-electroplated M-5
bolts, GI Handle of size 80 mm x 15 mm -1 No per shutter, 2 nos of stainless steel heavy duty pivot hinges
of size 3" of SS 304 Grade per shutter, window panes with 5 mm thick plain float glass and fixed with
glass beading section of 10x12 mm size with 0.8 mm thick powder coated aluminium 'U' channel and
window frames fixing to the concrete/masonry wall arrangement with self expanding screws, complete for
finished item of work including of all taxes - 1530 x 1372 or above size

Galvanized powder coated Casement Windows with openable shutters duly manufactured using
pressed steel sections in mild steel conforming to IS 513 of having 1.0 mm thick and galvanized as per IS
277 of 120 GSM surface treatment with pure polyester powder coating of 30-40 microns thick and section
for outer frame of 88x50mm, centre for mullion of 62x88 mm, section for glass and fly-proof mesh shutter
of 52 x 22 mm, outer frame and mullions to have two sides rebate for glazed shutter of size 24 mm and
10x10 mm square guard bars provided at 125 mm c/c the sections assembled with bolt & nut assembly
with zinc-electroplated M-5 bolts, GI Handle of size 80 mm x 15 mm -1 No per shutter, 2 Nos of stainless
steel heavy duty pivot hinges of size 3" of SS 304 Grade per shutter, window panes with 5 mm thick plain
float glass and fixed with glass beading section of 10x12 mm size with 0.8 mm thick powder coated
aluminium 'U' channel and fly-proof mesh of SS 304 grade fixed with 18 mm x 12 mm BT wood beading
and window frames fixing arrangement to the concrete/masonry wall with self expanding screws, complete
for finished item of work including of all taxes - 1220 x 1372 or below size

Galvanized powder coated Casement Windows with openable shutters duly manufactured using
pressed steel sections in mild steel conforming to IS 513 of having 1.0 mm thick and galvanized as per IS
277 of 120 GSM surface treatment with pure polyester powder coating of 30-40 microns thick and section
for outer frame of 88x50mm, centre for mullion of 62x88 mm, section for glass and fly-proof mesh shutter
of 52 x 22 mm, outer frame and mullions to have two sides rebate for glazed shutter of size 24 mm and
10x10 mm square guard bars provided at 125 mm c/c the sections assembled with bolt & nut assembly
with zinc-electroplated M-5 bolts, GI Handle of size 80 mm x 15 mm -1 No per shutter, 2 Nos of stainless
steel heavy duty pivot hinges of size 3" of SS 304 Grade per shutter, window panes with 5 mm thick plain
float glass and fixed with glass beading section of 10x12 mm size with 0.8 mm thick powder coated
aluminium 'U' channel and fly-proof mesh of SS 304 grade fixed with 18 mm x 12 mm BT wood beading
and window frames fixing arrangement to the concrete/masonry wall with self expanding screws, complete
for finished item of work including of all taxes - 1530 x 1372 or above size

Providing & Fixing of Mesh windows made of pre-painted steel (Base Steel as per IS 513 of 0.58mm thick
galvanized as per IS 277 with zinc of 120 GSM), primer coated with epoxy primer of 5-7 microns thick,
finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick
alkyd backer, section for outer frame of 47 x 36 mm, centre mullion of 60 x 36 mm, section mesh
beading 18 x 6 mm and Fly mesh shutter section of 20 x 40 mm, the sections cut to length meter
joined with corner bracket and centre mullions fixed with mullion cap, handles, latch, 2 Nos of heavy
duty stainless steel pivot hinges per S.S. Mesh for fly mesh shutter (304 grade) including fixing the
frames in the concrete/masonry wall by means of self expanding screws complete for finished item of
work.

Providing & fixing white colour Rigid PVC window frame and shutter with single rebate using frame
section of 50 x 35 mm, centre mullion 50 x 47 mm and the thickness of shutter 25 mm thick, the frame
work made of M.S. Tube of 19 gauge of size 15 x 15 mm and solid PVC Section made of 4 mm thick (3.75
mm PVC foam sheet laminated with .25 mm rigid PVC sheet) and heat moulded PVC C section of size
50 x 25 x 25 mm forming rails & stiles and reinforced with M.S.Tube of 19 gauge of size 15 x 15 mm and
suitably joined with solvent cement and fitted with 4 mm thick glass panel with Aluminium handles,
tower bolts, hinges and stopper complete as per direction of Engineer in-charge and manufacturers
specification. (All sizes with openable shutters)

Providing & fixing white colour Rigid PVC window frame and shutter with doouble rebate (glass &
mesh) using frame section of 42 x 115 mm made out of M.S.Tube of 19 gauge 15 x 15 mm and solid PVC
section made from 4 mm thick (3.75 mm foam sheet laminated with 0.25mm rigid PVC sheet Suitably
joined using PVC solvent cement and the window shutter of 25 mm thick heat moulded with PVC C
section of size 50 x 25x 50mm forming rails & stiles and reinforced with with M.S.Tube of 19 gauge 15 x
15 mm and glass and wire mesh fitted externally in the clear space available between stiles and rails and
fixed with PVC beading of size 23 mm x 16 mm complete as per direction of Engineer in charge and
manufacturers specification (All sizes with openable shutters)

Providing and fixing COMPOSITE SLIDING WINDOW fabricated from roll formed sections made of
Galvanized Steel colour Coated/Powder Coated (Base Steel as per IS 513 D quality, Galvanized as per
IS 277 with Zinc of 120 grams /Sq.Mtr.) with total coated thickness of 0.60mm, powder coated with pure
Polyester Powder up to 50-60 microns thick and the section for external frame bottom of 68 x 25mm
(Aluminium), External frame sides & Top of 68 x 25 mm (Aluminium), section for shutter of 60 x 23mm and
Lap Strip of 30 x 7.5mm (uPVC) cut to length and mitre joined with L-bracket and 5 mm plain float Galss
with Ethyl Propylene Diamine Monomer (EPDM) gasket, the corner bracket for external frame made of
Aluminium L-Angle, Corner Bracket for internal frame made of Polyproylene, Crescent Latch, Rollers, &
EPDM Gaskets for shutters, wool pile for lap strip, Bump Stop Base & Rubber for shutter stopper
including fixing to brick/concrete masonry using Nylon self-expanding caps and driving MS electroplated
80mm long screws into the caps through frames and fixing 10mm square guard bars with 6 pitch centre
to centre (152.4mm) and all taxes completed for finished item of work

Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS
513, D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder
coated with Pure polyester powder upto 50-60 microns thick with total coated thickness of 0.8 mm for
Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks with Grill
provision size of 90 mm x 50 mm and without grill provision is of 75 mm x 50 mm and the Window
Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width
and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet
component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make
and fixed with EPDM weathering seal resistant accessories and handle made of Alumimium 1 No. per
each shutter and cut to length miter joined with corner brackets including installation of window
system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of
conveyance of all materials accessories, labour charges, and erection at site with complete finished item
of work.

Window with Two Sliding Shutters and without Grill Outer Frame Size 75 mm x 50 mm.
Window with Two Sliding Shutters and with Grill Outer Frame Size 90 mm x 50 mm have a rebate of
15mm x 5 mm to fit grill made of 10mm MS Sq Rods for horizontal bars welded at a regular pitch of
150mm to 12mm x 6 mm MS flat.

Providing and fixing of Three shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS
513, D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder
coated with Pure polyester powder upto 50-60 microns thick with total coated thickness of 0.8 mm for
Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for three tracks with
grill provision size of 105 mm x 50 mm and without grill provision is of 90 mm x 50 mm and the
Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm
width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain
outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed
make and fixed with EPDM weathering seal resistant accessories and handle made of Alumimium 1 No.
per each shutter and cut to length miter joined with corner brackets including installation of
window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive
of conveyance of all materials accessories, labour charges, and erection at site with complete finished
item of work.

Window with 3 shutters (center fixed shutter / Center sliding shutter / center Fly mesh shutter) and with
Grill Window made of Outer Frame of Size 105 mm x 50 mm. Grill made of 10mm MS Square Rods for
horizontal bars at a regular pitch of 150mm welded to MS flat of 12 mm x 6 mm.
i) Center Shutter Fixed: center shutter frame made of section with size 20mm x 47mm should be fitted
with 5mm thick plain float glass of reputed make, EPDM gasket all around the glass and fixed to the Outer
Frame with the supporting section of size 29mm x 20mm of 0.58mm thick fixed horizontally on top and
bottom of the shutter frame.
ii) Center Shutter Sliding: center shutter frame made of section of size 20mm x 47mm should be fitted
with 5 mm thick plain float glass of reputed make. The supporting guide section of size 15mm x 19mm
of 0.58mm thick fixed horizontally at top and bottom of shutter frame and slides along the bottom
and top guide tracks made of sections size 24mm x 20mm of 0.58mm thick and 29mm x 20mm of
0.58mm thick

iii) Center Fly mesh Shutter Sliding: Section for Fly mesh Shutter frame should be of size 20mm x 40mm
of 0.58mm thick and fitted with SS mesh (304 Grade). The supporting guide section of size 29mm x
20mm of 0.58mm thick at the bottom and 15mm x 19mm of 0.58mm thick at the top fixed horizontally to
the Fly mesh frame and slides along the bottom and top guide tracks made of sections size 20mm x
20mm of 0.58mm and 29mm x 20mm of 0.58mm.
Window with 3 shutters (Center fixed shutter / Center sliding shutter / center Fly mesh shutter) and
without Grill Window made of Outer Frame of size 90mm x 50mm.
i) Center Shutter Fixed: center shutter frame made of section with size 20mm x 47mm of 0.58mm thick
should be fitted with 5mm thick plain float glass of reputed make, EPDM gasket all around the glass and
fixed to the Outer Frame with the supporting section of size 29mm x 20mmof 0.58mm thick fixed
horizontally on top and bottom of the shutter frame.
ii) Center Shutter Sliding: center shutter frame made of section with size 20mm x 47mm of 0.58mm thick
should be fitted with 5 mm thick plain float glass of reputed make. The supporting guide section of size
15mm x 19mm of 0.58mm thick fixed horizontally at top and bottom of shutter frame and slides along the
bottom and top guide tracks made of sections size 24mm x 20mm of 0.58mm thick and 29mm x 20mm of
0.58mm thick.

iii) Center Fly mesh Shutter Sliding: Section for Fly mesh shutter frame should be of size 20mm x 40mm
and fitted with SS mesh (304 Grade). The supporting guide section of size 29mm x 20mm of 0.58mm
thick at the bottom and 15mm x 19mm of 0.58mm thick at the top fixed horizontally to the Fly mesh frame
and slides along the bottom and top guide tracks made of sections size 20mm x 20mm of 0.58mm
thick and 29mm x 20mm of 0.58mm thick.
Providing and fixing of Openable / Casement Windows made of pre-painted steel (Base steel as per
IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a
polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre
mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions
to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length
metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon
latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt
Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets
including fixing the frames in concrete/masonry wall by means of
self expanding screws,
Including 10 mm Square guard bars with 6 (152.4mm) pitch etc., complete for finished item of
work.

Single openable shutter window size of 2 0 x 4 0 (609.6 x 1219.2mm) outer frame section size of 80 x
45mm, shutter frame section size of 52 x 25mm thick
Double openable shutter window Size of 3 0 x 4 0 (914.4mm x 1219.2mm) outer frame section
size of 80 x 45mm,shutter frame section size of 52 x 25mm, vertical mullion section size of 80 x 60
mm
Double openable shutter window size of 40 x 40 (1219.2mm x 1219.2mm) outer frame section
size 80 x 45mm, shutter frame section size of 52 x 25 mm ,Vertical mullion section size of 80 x 60
mm
Double Openable Shutter and Centre Fixed window of size 50 x 40 ( 1524 x 1219.2mm ) outer frame section size
of 80mm x 45mm, shutter frame section size of 52 x 25mm ,Vertical mullion section size of 80 x 60 mm,
beading section size of 9 x 12mm to be provided for glass holding

Double Openable Shutter and Centre Fixed window of size 60 x 40 ( 1829.6 x 1219.2mm) outer frame
section size of 80mm x 45mm , shutter frame section size of 52 x 25mm ,Vertical mullion section
size of 80 x 60 mm, beading section size of 9 x 12mm to be provided for glass holding
Note: The above rates are for normal finish, 10% extra may be allowed for Wood Grain finish

Providing and fixing of Openable / Casement Windows with fly mesh made of pre-painted steel
(Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM),
finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 100 x 45 mm,
centre mullion of 100 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, section for
fly-shutter of 52 x 25 mm x 0.6 mm thick and fitted with stainless steel 32 gauge fly mesh of 304
grade with 144 holes per sq.inch and mullions to have double rebate for glazed shutter and flyshutter with a provision for guard bars/grills and the sections cut to length metre joined with corner
bracket,centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window
stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per
shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the
frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square
guard bars with 6 (152.4mm) pitch etc., complete for finished item of work.

Single openable shutter window size of 2 0 x 4 0 (609.6 x 1219.2mm) outer frame Double
rebate section size of 100 x 45mm, Glazed and fly mesh shutter profile section size of 52 x 25mm
Double openable shutter window Size of 3 0 x 4 0 (914.4mm x 1219.2mm) outer frame Double
rebate section size of 100 x 45mm, Glazed and fly mesh shutter profile section size of 52 x 25mm,
vertical mullion section size of 100 x 60 mm
Double openable shutter window size of 40 x 40 (1219.2mm x 1219.2mm) outer frame Double
rebate section size of 100 x 45mm, Glazed and fly mesh shutter profile section size of 52 x 25mm,
vertical mullion section size of 100 x 60 mm
Double Openable Shutter and Centre Fixed window of size 50 x 40 (1524 x 1219.2mm ) outer frame
section size of 80mm x 45mm , shutter frame section size of 52 x 25mm , Vertical mullion
section size of 100 x 60 mm , beading section size of 9 x 12mm to be provided for glass holding
Double Openable Shutter and Centre Fixed window of size 60 x 40 1829.6 x 219.2mm) outer frame
section size of 80mm x 45mm , shutter frame section size of 52 x 5mm , Vertical mullion
section size of 100 x 60 mm , beading section size of 9 x 12mm to be provided for glass holding
Note: The above rates are for normal finish, 10% extra may be allowed for Wood Grain finish
Providing and fixing of top hung Ventilators made of pre- painted steel (Base steel as per IS 513
of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a
polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre
mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to
have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre
joined with corner bracket, centre mullion fixed with mullion cap,1 No. of High grade nylon latch
handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per
shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the
frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square
guard bars with 6 (152.4mm) pitch etc., complete for finished item of work.

Single openable ventilator shutter size of 2 0 x 2 0 (609.6 x 609.6mm) outer frame section size of
80 x 45mm, shutter frame section size of 52 x 25mm thick
Double openable ventilator shutter Size of 4 0 x 2 0 (1219.2mm x 609.6mm) outer frame section
size of 80 x 45mm,shutter frame section size of 52 x 25mm, vertical mullion section size of 80
x 60 mm
Double openable fix shutter size of 40 x 30 (1219.2mm x 914.4mm) outer frame section size
of 80 x 45mm , shutter frame section size of 52 x 25 mm ,Vertical mullion section size of 80 x 60
mm
Single fixed Louvers Ventilator
80 x 45mm

size of 20x 20 (609.6 x 609.6mm) outer frame box section size of

Double fixed Louvers ventilator Size of 4 0 x 2 0 (1219.2mm


size of 80 x 45mm, vertical mullion section size of 80 x 60 mm

x 609.6mm) outer frame box section

Double fixed Louvers Ventilator size of 40 x 30 (1219.2mm x 914.4mm) outer


section size of 80 x 45mm , Vertical mullion section size of 80 x 60 mm
Note: The above rates are for normal finish, 10% extra may be allowed for Wood Grain finish

frame box

Providing and fixing of top hung Ventilator with fly mesh made of pre-painted steel (Base steel as
per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with
a polyester paint of 60-65 microns thick and section for outer frame of 100 x 45 mm, centre
mullion of 100 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, section for fly-shutter of 52 x
25 mm x 0.6 mm thick and fitted with stainless steel 32 gauge fly mesh of 304 grade with 144
holes per sq.inch and mullions to have double rebate for glazed shutter and fly-shutter with a
provision for guard bars/grills and the sections cut to length metre joined with corner
bracket, centre mullion fixed with mullion cap, 1No. of High grade nylon latch handle, window
stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and
windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in
concrete / masonry wall by means of self expanding screws, Including 10 mm Square guard bars
with 6 (152.4mm) pitch etc., complete for finished item of work.

Single openable ventilator shutter window size of 2 0 x 2 0 (609.6 x 609.6mm) outer frame
section size of 100 x 45mm, Glazed and fly mesh shutter frame section size of 52 x 25mm
thick
Double openable ventilator shutter window Size of 4 0 x 2 0 (1219.2mm x 609.6mm) outer frame section
size of 100 x 45mm, Glazed and fly mesh shutter frame section size of 52 x 25mm, vertical mullion section
size of 100 x 60 mm

Double openable fix shutter window size of 40 x 30 (1219.2mm x 914.4mm) outer frame section
size 100 x 45mm , Glazed and fly mesh shutter frame section size 52 x 25 mm ,Vertical mullion
section size of 100 x 60 mm
Single fixed Louvers Ventilator window size of 2 0 x 2 0 (609.6 x 609.6mm) outer frame box
section size of 100 x 45mm, fly mesh shutter frame section size 52 x 25 mm
Double fixed Louvers ventilator window Size of 4 0 x 2 0 (1219.2mm x 09.6mm) outer frame
box section size of 100 x 45mm, fly mesh shutter frame section size 52 x 25 mm, vertical mullion
section size of 100 x 60 mm
Double fixed Louvers Ventilator window size of 40 x 30 (1219.2mm x 914.4mm) outer
frame box section size 100 x 45mm , fly mesh shutter frame section size 52 x 25 mm Vertical
mullion section size of 100 x 60 mm
Note: The above rates are for normal finish, 10% extra may be allowed for Wood Grain finish
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC
sections with TPV gaskets having isolated drainage and reinforced with Galvanized Iron profiles
throughout the window. The outer frame having an overall size of 60 x 55 mm with reinforcement
of 1 mm thickness and Mullion with overall size of 74 x 60 mm with reinforcement of 1 mm
thickness. Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall
thickness of frame & Mullion shall be 2.0 mm
Providing, supplying & fixing of Top hung Ventilator With Exhaust Fan Provision made
out of multi chambered uPVC sections with TPV gaskets having isolated drainage and
reinforced with Galvanized Iron profiles throughout the window. The outer frame having an
overall size of 60 x 55 mm with reinforcement of 1 mm thickness, Mullion with overall size of 74
x 60 mm with reinforcement of 1 mm thickness and Sash with overall size of 75 x 60 mm with
reinforcement of 1.5 mm thickness. Glazing bead for fixing of glass shall be of size 34 x 20 mm
coextruded with gasket. Ventilator shall be provided with 4.5 mm Pin Head glass, standard
hardware, single point locking and friction stays. Wall thickness of frame, mullion and sash shall be 2.0
mm

STRUCTURAL GLAZING
Designing, providing and fixing Structural Glazing fabricated from Roll formed sections made of Prepainted Steel / Powder coated (Base steel as per IS 513 of D quality, galvanized as per IS 277 with Zinc
of 120 Gm/Sqm) with total coated thickness of 0.72 mm and the glass holding section made of 304 grade
stainless steel of 0.58 mm thick galvanised steel section as stiffeners inside the colour coated steel
powder coated sections as per the design requirement & calculations to suit wind pressures as given in
IS: 875, the primer coat with epoxy primer of 5 7 microns thick, finish painted with a polyester paint of
12-16 microns thick and back coated with Alkyd backer of 5-7 microns or powder coated with pure
polyester powder up to 50-60 microns thick and the vertical section of 50 mm x 100 mm x 0.72 mm, 33
mm x 58 mm x 0.72 mm for frame horizontal section, stiffener section of 48 mm x 98 mm x 1 mm, cover
profiles sections of 20 mm x 58 mm x 0.58 mm, glass holding section of 37 mm x 37 mm & 37 mm x 18
mm including fixing 5mm thick Ocean Blue reflective glass, brackets made of CRCA powder
coated/Electroplated to connect vertical to horizontal, vertical to slab, to fix verticals at top & bottom as per
site requirement and gasket made of Ethyl Propylene Diamine Monomer, U.V. resistant silicon sealant
including fixing in concrete/masonry wall with self-expanding cap & screws inclusive of cost and
conveyance of all materials to site, all labour charges, incidental charges, cost of all consumables etc.
and scaffolding charges, form work etc. complete for finished item of work.

Designing, providing and fixing Top Hung shutters in Structural Glazing fabricated from Roll formed
sections made of Pre-painted Steel / Powder coated (Base steel as per IS 513 of D quality, galvanized
as per IS 277 with Zinc of 120 Gm/Sqm) with total coated thickness of 0.72 mm and the glass
holding section made of 304 grade stainless steel of 0.6 mm thick, duly providing stiffeners inside the
colour coated steel/powder coated sections as per the design requirement, calculations to suit wind
pressures as given in IS 875 and primer coat with epoxy primer of 5-7 microns thick and back coated with
Alkyd backer of 5-7 microns or powder coated with pure polyester powder up to 50-60 microns thick and
the outer frame of 20 mm x 58 mm x 0.6 mm, shutter sections of 58 mm x 33 mm x 0.72 mm, stiffener
sections of 56 mm x 31 mm x 1mm, hinges 2 Nos for each shutter and aluminium Stays 2 Nos. for
each shutter, aluminium Handle 1 no. for each shutter including cost and conveyance of all materials to
site, all labour charges, incidental charges, cost of all consumables etc. and scaffolding charges, form
work etc. complete for finished item of work

Designing, supplying and fixing of curtain Glazing made of pre painted steel (base steel as per IS 513 of
0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM) Primer coated with epoxy primer
of 5-7 microns thick, finish painted with a polyester paint of 12- 16 microns thick and back coated with 5-7
microns thick alkyd backer using the section for outer frame of 46 x 52 mm, section for mullion of 46 x 70
mm and section for beading of 18 x 25 mm and the glazing with 5 mm thick plain float glass fitted with
Ethyl Propylene diameine Monomer (EPDM) gaskets and the sections cut to length, mitre joined with
corner bracket, centre mullions fixed suing mullion cap inluding handle made of high grade
Aluminium powder coated and nylon receiver, corner brackets made of CRCA with zinc phosphating,
mullion caps made of Glass filled nylon including fixing the frames in the concrete / masonry wall with
self expanding screws, etc., complete for finished item.- Fixed Glazing 2'-0" x 2'-0" (609.6x609.6mm)
grid outer frames section size of 46 x 52 mm

Mullion section size of 46 x 70mm Beading section size of 18 x 25 mm - Fixed Glazing 2'-0" x 3'-0"
(609.6x914.4mm) grid outer frame section size of 46 x 52 mm
Mullion section size of 46 x 70mm Beading section size of 18 x 25 mm Fixed Glazing 3'-0" x 3'-0"
(914.4x914.4mm) grid outer frame section size of 46 x 52 mm

Mullion section size of 46 x 70mm Beading section size of 18 x 25 mm Fixed Glazing 3'-0" x 4'-0"
(914.4x1219.2mm) grid outer frame section size of 46 x 52 mm
deleted
deleted
deleted
deleted
deleted
deleted
Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) Curtain Walling systems duly
manufactured using UPVC reinforced profiles of 60 mm x 56 mm x 2.5 mm for outer frames, 60 mm
x 70 mm x 2.5 mm for casement shutter frames and the mullion sections are of 60 mm x 70
mm x 2.5 mm or 60 mm x 62 mm x 2.5 mm for sliding shutter outer frames and 77 mm x 38 mm x
2.5 mm for sliding shutter frames structurally reinforced with hot dip galvanized up to 50 microns
of minimum thickness of 1 mm the sash shall be fitted with 5 mm thick clear float glass of reputed
make duly fixed with EPDM weathering seal resistant and accessories for casement window friction stay hinges of stainless steel grade 304- 2 Nos., per sash, handle with mazak alloy casting
1 No. per sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges
for smooth operation for sliding window - clipping locking system 1 No. made of aluminium including cost
and conveyance of all materials, accessories, labour charges for transportation, erection at site with
templates for casement sizing complete for finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC)


Fixed Glazing - 48 series duly manufactured using UPVC reinforced profiles of 60 mm x 48 mm x
2.25 mm for outer frames and the mullion sections are of 60 mm x 76 mm x 2.25 mm frames are
structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm
the sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with EPDM
weathering seal resistant including cost and conveyance of all materials, accessories, labour
charges for transportation, erection at site with templates for casement sizing
complete for
finished item of work

Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC)


Fixed Glazing - 56 series duly manufactured using UPVC reinforced profiles of 60 mm x 56 mm x
2.25 mm for outer frames and the mullion sections are of 60 mm x 70 mm x 2.25 mm frames are
structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm
the sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with EPDM
weathering seal resistant including cost and conveyance of all materials, accessories, labour
charges for transportation, erection at site with templates for casement sizing
complete for
finished item of work

A. DISMANTLING clearing away and carefully stacking materials useful for reuse.
Stone masonry in cement mortar
Terracing work in roofs or floors
Flat stones in roof or floors including lifting
Pan tiled or Mangalore tiled roof without roof timbers.
Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers
Wrought and framed timber in roofs or floors
Old lime mortar plaster

Old cement mortar plaster


Dry rough stone revetment for aprons and stacking within 40 M lead
Revetment for aprons and stacking grouted within 40 lead
Kadapa slabs or Shahabad stone slabs flooring on sand bed
Through scraping of old plastered surface
Washing of plastered surface with soap, soda and water (or with soda lime and water)
clean removal of lime plaster from walls and raking out joints 20mm deep or from terraced roof and
raking out joints 100 mm deep
Clean removal of cement plaster from walls and raking out joint 200 mm deep
READY MIX CONCRETE
Supply and placing of the Ready Mix Concrete as per IS-4926:2003 of following grades with minimum
cement content as per IS-456:2000 and Standard Mix Design as per IS-10262:1982 with coarse
aggregate of nominal size 20 mm and fine aggregate of Zone-II as per the Mix Design approved by the
Department from standard suppliers including cost and conveyance, vertical pumping up to 5 floors/
horizontal pumping up to 60.0 M for buildings/ pavements etc., works for basic cost excluding levelling,
grading, spreading, curing, centring, vibrating, compacting, finishing etc as required

RMC - M -10 (CEMENT CONTENT - 220 Kgs)


RMC - M -15 (CEMENT CONTENT - 280 Kgs)
RMC - M -20 (CEMENT CONTENT - 300 Kgs)
Extra rate for pumping for each additional floor above 5 Floors / for each 12.0 M additional length over
60.0 M for horizontal pumping to be added in the datas
Extra rate for pumping with Boom Pump up to 24.0 M vertical height from average ground level
Note: 1. Variation in cement content for mixes other than specified above has to be adjusted in the rates
as per the corresponding approved rate of Cement per Kg. 2.For Standard Concrete and High Strength
Concretes vide IS-456, rates may be arrived as per the design mixes.

EXPANSION JOINT FILLERS


Supply of high performance expansion joint filler board conforming to M.O.S.T - 18 mm THICK
Supply of high performance expansion joint filler board conforming to M.O.S.T - 20 mm THICK
Supply of high performance expansion joint filler board conforming to M.O.S.T - 25 mm THICK
Supply of expansion joint filler board for buildings, columns, beams and slabs 20 mm THICK
Supply of expansion joint filler board for buildings, columns, beams and slabs 25 mm THICK
Supply of expansion joint filler board for buildings, columns, beams and slabs 50 mm THICK
Supply of back up to cold applied sealant in construction and longitudinal joint - 10 mm OD
Supply of back up to cold applied sealant in construction and longitudinal joint - 12 mm OD
Supply of back up to cold applied sealant in construction and longitudinal joint - 15 mm OD

Supply of back up to cold applied sealant in construction and longitudinal joint - 20 mm OD


Supply of back up to cold applied sealant in construction and longitudinal joint - 25 mm OD

LABOUR CHARGES
Bailing out water for earth work excavation /concrete
building items only) - Other than sandy soil - 0.0 M to 1.0 M

for foundation below water level. (For

Bailing out water for earth work excavation /concrete


building items only) - Other than sandy soil - 1.0 M to 2.0 M

for foundation below water level. (For

Bailing out water for earth work excavation /concrete for foundation below water level. (For building items
only) - Other than sandy soil - 2.0 M to 3.0 M
Bailing out water for earth work excavation / for concrete foundation below water level. (For building
items only) Sandy soil - 0.0 M to 1.0 M
Bailing out water for earth work excavation
building items only) Sandy soil - 1.0 M to 2.0 M

/for

concrete foundation below water level. (For

Bailing out water for earth work excavation


building items only) Sandy soil - 2.0 M to 3.0 M

/concrete

for foundation below water level. (For

Labour charges for making, fabricating office furniture, racks, work-station furniture, cup-board
shutters with ply-wood/ MDF sheets, decolam/ veneer aminations including fixing cutting, making,
assembling, fixing hinges, fixing fixtures, fixing locks, pasting sheets/ laminations fixing in position with
necessary screws excluding cost of materials, accessories, fittings
Labour charges for making, fabricating kitchen furniture, cup - boards with shutters, box cup-boards,
box racks, with ply-wood/ MDF sheets, decolam/ veneer laminations including fixing cutting, making,
assembling, fixing hinges, fixing fixtures, fixing locks, pasting sheets/ laminations fixing in position with
necessary screws excluding cost of materials, accessories, fittings
Rounding the edges of Kadapa / Shahabad stone slabs of any thickness including polishing the
same
Half Rounding the edges of Marble/ Granite stone slabs of all thicknesses including polishing the
same.
Full Rounding the edges of Marble/ Granite stone slabs of all thicknesses including polishing the
same.
Machine Cutting charges - for Marble/ Granite slabs up to 50 mm thick by mechanical device.
Flat nosing to Kadapa/ Shahabad stone slabs of any thick
Labour charges for fabricating steel works like Window Grills,Compound Wall Grills, Iron Doors,
Windows including cost of welding rods, power charges, excluding cost of fixing in position
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in position
Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Girders
including cost of welding rods, power charges, etc excluding cost of fixing in position
Labour charges for fixing heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting
in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in
position
Labour charges for Fabrication of stainless steel railing works using stainless steel welding rods including
buffing, polishing, lacquer finishing, to present seamless finish
Labour charges for Fabrication of stainless steel sheet cladding works using stainless
welding rods including buffing, polishing, lacquer finishing, to present seamless finish

steel

Labour charges for Glass designing works on any thickness of Glass including fixing at site - Etching
works
Labour charges for Glass designing works on any thickness of Glass including fixing at site - Reverse
Etching work
Labour charges for Glass designing works on any thickness of Glass including fixing at site - Acid wash
works
Labour charges for fixing Flush door shutters of any thickness to the existing door frame including fixing
the fixtures to the door shutter excluding cost of shutter
Labour charges for fixing glass panes of any thickness to the existing door / window panes
including fixing the beading excluding cost of beading
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood fully pannel dore for external or internal
frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood fully pannel dore for external or internal
frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood framed and planked doors including frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood lagrend,braced and planked doors including
frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood flash type shutters including frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows glazed including outer frames
shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows planlled including outer frames
shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood lagrend,braced and planked doors including
outer frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood lagrend,braced and planked doors including
outer frames shutter frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows glazed fixed with double frame
with wird netting including frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood swing ventilators glazed including outer
frames shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood weld mesh door and windows including
outer frames shutters frame

Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood G.I and AC shutters door including outer
frames shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows fully planlled doors external and
internal including frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows glazed and planlled doors
including fixing glass including frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows framed and planke doors including
frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood lagrend,braced and planked doors including
frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood flash type door shutters including frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows glazed including outer frames
shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows panelled including outer frames
shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood lagrend,braced and planked doors including
outer frames
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood windows framed and planked including
outer frames shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood ventilators glazed fixed with double frame
with wird netting including frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood swing ventilators glazed including outer
frames shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood weld mesh door and windows including
outer frames shutters frame
Labour chargers for wroght and put up including fixing in position of any size shuters for dore windows
ventilators including fixing all necessary fixtures for teak wood G.I and AC shutters door including outer
frames shutters frame

MISCELLANEOUS ITEMS
Supplying Aluminium anodised
annodization cost)

Sections

for

Doors,

partitions, windows, Ventilators (including

Sun Control film to the glazed windows partition including labour charges.
Aluminium Venetian Blinds horizontal 25.4 mm wide with all accessories.
Aluminium Venetian Blinds horizontal 20.0 mm wide with all accessories.
Venetian blinds Vertical blinds 100 mm wide with all accessories.
Rubber Beading
S&F of marblex flooring with 2.0 mm thick in rolls.
S&F Vinyl Flooring with 1.5 mm thick in rolls
Chlorpyriphos/ Lindane emulsifiable concentrate of 20%
Soft Brush
Wire Brush
Supplying and fixing aluminium composite cladding with skin material 0.25 mm thick aluminium sheet
cover material natural polyethylene aluminium cladding panel fixed with extruded aluminium basis frame
(50x25x1.5mm) angle cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on
structural steel work including necessary accessories complete in all respects including all scaffolding
and labour charges etc., complete for finished item of work but excluding cost of structural steel
fabrication, if any, ACP Cladding - 3 mm thk

Supplying and fixing aluminium composite cladding with skin material 0.25 mm thick aluminium sheet
cover material natural polyethylene aluminium cladding panel fixed with extruded aluminium basis frame
(50x25x1.5mm) angle cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on
structural steel work including necessary accessories complete in all respects including all scaffolding
and labour charges etc., complete for finished item of work but excluding cost of structural steel
fabrication, if any, ACP Cladding - 4 mm thk

Supplying and fixing aluminium composite cladding with skin material 0.5 mm thick aluminium sheet
cover material natural polyethylene aluminium cladding panel fixed with extruded aluminium basis frame
(50x25x1.5mm) angle cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on
structural steel work including necessary accessories complete in all respects including all scaffolding
and labour charges etc., complete for finished item of work but excluding cost of structural steel
fabrication, if any, ACP Cladding - 4 mm thk

CEMENT JALI - 25 mm thick


CEMENT JALI - 40 mm thick
CEMENT JALI - 50 mm thick
Aluminium sheet 24 Gauge
7.5mm thick Aluminium Grill (as approved by the department) 3.58 Kg/Sqm.
Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1" (25.4 mm ) thick
Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1/2" (12.7 mm ) thick
Supply of hot pressed compression moulded sign plates for making road signs as per the approved
dimensions of National Highway Authority Of India, complete, for finished item of work.
Circular sign plate Dia 400mm.
Circular sign plate Dia 600mm.
Circular sing plate Dia 870mm
Triangular sign plate 600mm.
Triangular sign plate 900mm.

Square sign plate 600mm.


Square sign plate 1000mm.
Supply

of Polyethylene water

storage

tank

double layer conforming to IS:12701-1996 with lid.

Design, fabrication & supply of light weight pre engineered buildings for a maximum span of 9 metres with
50x50x2.8 mm M.S hollow square tubes for columns, trusses & purlins walls with sandwich panels made
up of 2 Nos 10mm thick cement bonded particle/ fibre boards with 25mm thick 12 kg/cum density
expanded polystyrene in between encased in 1.25 mm thick 24x7x26 mm W tracks in bottom & top and
H section for sides with doors, windows & ventilators, roofing with 26 gauge pre painted profiled sheets
fixed with self tapping/ drilling screws, painting with enamel paint for steel items, OBD for interiors and ace
for exteriors & providing base plates, templates & anchor bolts along with civil foundation designs &
drawings for the finished item of work. Inclusive of all Taxes and Duties.

Steel Structure: - Structure is made up of 50 x 50 x 2.8 m / 33 x 66 x 2.8mm thick hollow M.S.


sections for Trusses, columns, and purloins. - Columns
Steel Structure: - Structure is made up of 50 x 50 x 2.8 m / 33 x 66 x 2.8mm thick hollow M.S.
sections for Trusses, columns, and purloins. Trusses
10 mm thick 200x200 mm M.s. plates for base plates, 250 mm long 12mm anchor bolts with plate
washer and nuts complete with one coat of Asian or equivalent red oxide paint.
Sandwich panels: Sandwich panels of 50 mm thick with 25 mm thermocol of 12 kg / cum, fixed in between
2 Nos 10 mm cement bonded wood particle / fibre boards properly fixed together with 30
mmx30mmx30mm wood pieces along width & length wherever necessary
U' Tracks & 'H' Section:- Bottom & Top 'U' Tracks are made of 1.25 mm thick 120 GSM G.I. Sheet of size
24x51x26 mm size.
Fabricated 'H' sections are made up of 2 Nos 1.25 mm thick C.R. of 40 mm width for flanges and 1 Nos of
2 mm thick C.R. of 50 mm width plate for web. will be used
Sandwich Panel joinery is made up of couplers or equivalent made from 0.6 mm G.I. roll formed section
to hold 2 Nos of 10 mm board on both sides with 25 mm thermocol in between.
Window:- windows are made up of 51 x51 mm step 'U' section made from 1.25 thick MS Cold rolled Steel
Sheet and Windows Shutters & Grill are made of 48x25mm mm size pre painted section with 4 mm
glass complete with necessary hardware. Grills are made from 8 mm square rod at 100 mm spacing.
Door Frames :-51 X 51 Stepped ' U' section made from 1.25 mm thick C.R. section with a 32 mm rebate
for 30 mm flush door and Door Shutters with 30 mm thick block board / flush doors with boiling water
proof plywood complete with necessary Hard ware.
Ventilators:- Ventilators are made of 51x51 mm step 'U' section made From 1.25 mm thick C.R. sheet with
fixed louvers and glass.
Painting:-1) Steel structure is to be painted with 2 coats of Grade I enamel paint.
2) Exterior walls are painted with one coast of primer and 2 coats of exterior emulsion paint .
3) Interiors are painted with 1+2 coat of O.B.D.
Toilets: - Toilets are provided as per plan with a provision for fixing the wash basin, W.C. etc only is made
with M.S. steel section secured to the walls with toilet bracket provision excluding cost of WC/ Wash
basin etc

Sun shades: - Sun shades will be provided wherever necessary with 300 mm more than the width of
window. 25x25 mm angle frame to cover 450 mm in the front and the sides. 10mm cement bonded
particle board will be fixed on the frame work and sealed with green paste or equivalent.
Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to
the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping /
drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti
capillary grove.
Supply and fixing of factory made Bathroom door frames without threshold, fabricated from pre-painted
cold roll formed section 50mm x 50 mm made of galvanized (base steel as per IS 513 D quality,
galvanized as per IS-277 with Zinc of 120 Gms/sqm) steel colour coated sections with total coated
thickness of 1 mm, primer coated with epoxy primer of 5-7 microns thick, finish painted with polyester
paint of 12-16 microns and back coated with alkyd backer of 5-7 microns. The frame section is to be filled
with polyurethane (P.U. Foam) of 40 Kg/Cum; and the sections are cut to length and mitre joined by
means of 1.25mm thick CRCA electroplated corner brackets of size 75 x 75 mm and 1.25mm thick
electroplated stiffeners of size 150mm for fixing hold fasts and hinges together with the following MS
Power coated fitting (Supply and fixing) of approved make.

a) 6 Nos M.S. Z. Type hold fasts made of 30mm x 3 mm MS flat of 230mm long, 3 Nos each side
expandable PVC covered screw type fasteners
b) 2.5 mm x 300 mm long T hinges / 2.5mm x 50 mm x 100mm two way but hinges (3 Nos for single leaf
or 2 Nos for Double leaf /leaf )
c) 12 mm Dia MS tie rod at bottom with necessary size of nuts on either side.
Preparing gabions with jungle wood
Planting plants
Pruning plants
Maintaining avenues including fencing, weeding, mulching, watering etc per plant.
- do - When scattered in hot weather with extra conveyance from
March to June
Hoisting or lowering of slab
Dressing faces of granite stone (double line dressing)
Dressing faces of other than granite stone(double line dressing)
Supply of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness,
Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified
Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width:
1.020, Length: Maximum 12 Meters with Regular Range Colours
Supply of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.47mm thickness,
Coating: Alu-Zinc coating AZ 150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified
Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width:
1.020, Length: Maximum 12 Meters with Regular Range Colours
Supply of Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating:
Zinc coating Z120 GSM. Tensile Strength: 300 MPA. Paint coating: Regular Modified Polyester painting.
Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length:
Maximum 12 Meters with Regular Range Colours

Supply of Pre-painted Galvanized Trapezoidal Profile Roofing sheets with 0.47mm thickness, Coating:
Zinc coating Z120 GSM. Tensile Strength: 300 MPA. Paint coating: Regular Modified Polyester painting.
Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length:
Maximum 12 Meters with Regular Range Colours
Supply of Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes,
Gutter etc., with 0.50mm thick, Width: 0.585, Length: Maximum 2 Meters
Supply of Roof Accessories medium size: Ridge, Barge Cap, Corner Trim, L-Flashing, Down Pipes,
Gutter etc., with 0.47mm thick, Width: 0.585, Length: Maximum 2 Meters
75 mm long screws G.I scam bolts & nuts
G.I bolts & nuts
G.I J bolts 8 mm dia
G.I Washers
Limpet washers (for scam & J bolts)
Bitumen washers
White Cement
MS Z hold fasts -300mm long of 40X40X5mm ISA
Rubber / naylon door stop bushes
Naylon rollers for sliding glasses /allumium windows
powder coted are coloured annodization-any section
continous piano hings powder coted mild steel ap per IS:3818:1992 of nominal size of 25mm (B)
thickness of 0.8-1.0
box hinge cup boards
maganitic catchurs
drilling holes in hard rock up to18mm dia
drilling holes in hard rock above to18mm dia
Making holes up 18mm dia in rcc/any rock up to 50mm thick
Making holes up 18mm dia in rcc/any rock above to 50mm thick
pressurs grouting the drilling holes with neat cement slury or with aprived epoxy bonding agent with pump

MACHINERY CHARGES, HIRE CHARGES FOR CENTRING


Machine charges of rubbing/ polishing floor
Power Saw Cutter - Hand Operated - Hire charges
Power Drill - Hand Operated - Hire Charges
Grinding Mortar (Spl Grinding)
Casuarina Balli Props - 3" to 4" dia - 12'-0" Height
Casuarina Balli Props - 4" to 8" dia - 20'-0" Height
Wall Plate Brackets / beam bottom supports
Wedge Plate fixture
Runner beams of approximately 4" x 4" size
Steel Plates for form works
Scaffolding Pipes & Centering accessories
Scaffold Boards - Bamboo scaffolds - Bamboos - 8'0" long

WATER SUPPLY & SANITARY ITEMS


Description of item
3

S.W.G. PIPES & FITTINGS


Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 &
4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in
any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and
tamping.
Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 &
4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in
any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and
tamping.

Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 &
4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in
any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and
tamping.
Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 &
4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in
any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and
tamping.
labour charges only for laying, jointing and testing SWG pipes of any dia with airtight cement joints
including excavation of trenches and socket pits in any soil up to 914.4 mm (3'0") depth (except rock
requiring blasting) and refilling with watering and tamping.
labour charges only for laying, jointing and testing SWG pipes of any dia with airtight cement joints
including excavation of trenches and socket pits in any soil up to 1524 mm (5'-0") depth (except rock
requiring blasting) and refilling with watering and tamping.
a)Supplying , laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded
granite metal chips and cradling 101.6 mm SWG pipe line all round to have 76.2 mm thick cover over the
sockets.
b) - do - labour charges only

a)Supplying , laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded
granite metal chips and cradling 152.4 mm SWG pipe line all round to have 76.2 mm thick cover over the
sockets.
b) - do - labour charges only
a) Supplying & Laying 101.6 mm SWG channels with cement mortar joints with suitable brick masonry
for fixing the channels in position
b) - do - labour charges only
a) Supplying & Laying 152.4 mm SWG channels with cement mortar joints with suitable brick masonry
for fixing the channels in position
b) - do - labour charges only
Supply of SWG SP-1 pipe conforming to ISI 651 - 4" dia (101.6mm)
Supply of SWG SP-1 pipe conforming to ISI 651 - 6" dia (152.4mm)
Supply of SWG SP-1 pipe conforming to ISI 651 - 8" dia (203.2mm)
Supply of SWG SP-1 pipe conforming to ISI 651 - 10" dia (254 mm)
Supply of SWG SP-1 pipe conforming to ISI 651 - 12" dia (300 mm)
Supply of SWG SP-1 pipe conforming to ISI 651 - 14" dia (350 mm)
Supply of SWG SP-1 pipe conforming to ISI 651 - 16" dia (400 mm)
Supply of SWG SP-1 pipe conforming to ISI 651 - 18" dia (450 mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 4" dia (101.6mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 6" dia (152.4mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 8" dia (203.2mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 10" dia (254 mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 12" dia (300 mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 14" dia (350 mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 16" dia (400 mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 18" dia (450 mm)
Supply of SWG SP-3 pipe conforming to ISI 651 - 4" dia (101.6mm)
Supply of SWG SP-3 pipe conforming to ISI 651 - 6" dia (152.4mm)
Supply of SWG SP-3 pipe conforming to ISI 651 - 8" dia (203.2mm)
Supply of SWG SP-3 pipe conforming to ISI 651 - 10" dia (254 mm)
Supply of SWG SP-3 pipe conforming to ISI 651 - 12" dia (300 mm)
Supply of SWG SP-3 pipe conforming to ISI 651 - 14" dia (350 mm)
Supply of SWG SP-2 pipe conforming to ISI 651 - 16" dia (400 mm)
Supply of SWG SP-3 pipe conforming to ISI 651 - 18" dia (450 mm)
Supply of SWG Bends conforming to IS standards -100 mm dia
Supply of SWG Bends conforming to IS standards -150 mm dia
Supply of SWG Bends conforming to IS standards -200 mm dia
Supply of SWG Bends conforming to IS standards -250 mm dia
Supply of SWG Bends conforming to IS standards -300 mm dia
Supply of SWG Bends conforming to IS standards -350 mm dia
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 100 x
100
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 150 x
100
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 150 x
150
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 200 x
100

Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 200 x
150
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 200 x
200
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 250 x
100
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 250 x
150
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 250 x
200
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 250 x
250
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 300 x
100
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 300 x
150
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 300 x
200
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 300 x
250
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 300 x
300
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 350 x
100
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 350 x
150
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 350 x
200
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 350 x
250
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 350 x
300
Supply of SWG Junctions (T's & Y's) conforming to IS standards with length of barrel 60 cm for - 350 x
350
Supply of SWG Plugs conforming to IS standards for 100 mm dia
Supply of SWG Plugs conforming to IS standards for 150 mm dia
Supply of SWG Plugs conforming to IS standards for 200 mm dia
Supply of SWG Plugs conforming to IS standards for 250 mm dia
Supply of SWG Plugs conforming to IS standards for 300 mm dia
Supply of SWG Plugs conforming to IS standards for 350 mm dia
Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating &
Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9")
C.I Frame and hinged cover
Supply of SWG Gully Traps (Round & Square) conforming to IS standards 150 x 100 mm
Labour charges for fixing and laying the SWG Junctions/ Plugs/ Bends of any dia with airtight cement
joints as per standard practice
Supply of SWG Saddles conforming to IS standards 150 x 100 mm
Supply of SWG Saddles conforming to IS standards 200 x 100 mm

Supply of SWG Saddles conforming to IS standards 250 x 100 mm

MAN HOLES & INSPECTION CHAMBERS - AS PER - IS 4111 : Part 1 : 1986


Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986
with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a
minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; thick
both inside and outside fitted with 20 dia RCC manhole covers and frames including excavating pits up
to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150
mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, cost of seigniorage charges on all materials and all incidental and operational, labour charges
like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of
work as per Standard specification.

Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986
with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a
minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; thick
both inside and outside fitted with 20 dia RCC manhole covers and frames including excavating pits up
to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150
mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, cost of seigniorage charges on all materials and all incidental and operational, labour charges
like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of
work as per Standard specification.

Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a
minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; thick both
inside and outside fitted with 20 dia RCC manhole covers and frames including excavating pits up to a
depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm
thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, cost of seigniorage charges on all materials and all incidental and operational, labour charges
like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of
work as per Standard specification.

Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a
minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; thick both
inside and outside fitted with 20 dia RCC manhole covers and frames including excavating pits up to a
depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm
thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, cost of seigniorage charges on all materials and all incidental and operational, labour charges
like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of
work as per Standard specification.

Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry Inspection chamber up
to 914.4 mm (3'0") and fitted with light weight 914.4 mm x 457.2 mm (3'0"x1'6") C.I frame and cover
of 40 Kg.
Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to
914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20
Kg.
a)Making drainage connection in the existing inspection including all repairs
b) - do - labour charges only

C.I. PIPES & FITTINGS - AS PER - IS 1729:1979


Supplying and fixing of C.I. Single/ Double Socket soil pipes ISI marked conforming to IS:17291979 of reputed make with cement caulked joints and fixing as per site requirements including painting
black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement
mortar (1:1) and including fixing of M.S. clamps if necessary with required no. of Bombay nails etc.,
complete
3" dia (76.2 mm) Single Socket
4" dia (101.6mm) Single Socket
6" dia (152.4mm) Single Socket
3" dia (76.2 mm) Double Socket
4" dia (101.6mm) Double Socket
6" dia (152.4mm) Double Socket
Labour charges only for fixing of C.I. Single/ Double Socket soil pipes of any dia with cement caulked
joints and fixing as per site requirements including painting black with Japan paint and fixing with
necessary wooden blocks fixed in the masonry walls in cement mortar and including fixing of M.S. clamps
if necessary with required nails
Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729- 1979 with cement caulked
joints and fixing as per site requirements with standard practice for 3" dia (76.2 mm)
Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729- 1979 with cement caulked
joints and fixing as per site requirements with standard practice for 4" dia (101.6 mm)
Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729- 1979 with cement caulked
joints and fixing as per site requirements with standard practice for 6" dia (152.4 mm)
Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979 with cement
caulked joints and fixing as per site requirements with standard practice for 3" dia (76.2 mm)
Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979 with cement
caulked joints and fixing as per site requirements with standard practice for 4" dia (101.6 mm)
Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979 with cement
caulked joints and fixing as per site requirements with standard practice for 6" dia (152.4 mm)
Labour charges only for fixing CI Plain/ Plug (Door) bends with cement caulked joints and fixing as per site
requirements with standard practice
Supplying and fixing of 76.2 mm (3") CI soil single junction with plug : conforming to IS:1729-1979
with cement caulked joints and fixing
Supplying and fixing of 101.6 mm (4") CI soil single junction with plug : conforming to IS:17291979 with cement caulked joints and fixing
Supplying and fixing of 152.4 mm (6") CI soil single junction with plug : conforming to IS:17291979 with cement caulked joints and fixing

Supplying and fixing of 76.2 mm (3") CI soil plain single junction : conforming to IS:1729-1979 with
cement caulked joints and fixing
Supplying and fixing of 101.6 mm (4") CI soil plain single junction : conforming to IS:1729-1979 with
cement caulked joints and fixing
Supplying and fixing of 152.4 mm (6") CI soil plain single junction : conforming to IS:1729-1979 with
cement caulked joints and fixing
Labour charges only fixing CI soil single junctions with cement caulked joints and fixing as per site
requirements with standard practice
Supplying and Fixing of 76.2 mm (3") CI soil Double junction with plug :conforming to IS:17291979 with cement caulked joints and fixing
Supplying and Fixing of 101.6 mm (4") CI soil Double junction with plug : conforming to IS:1729-1979 with
cement caulked joints and fixing
Supplying and Fixing of 152.4 mm (6") CI soil Double junction with plug : conforming to IS:1729-1979 with
cement caulked joints and fixing
Supplying and Fixing of 76.2 mm (3") CI soil plain Double junction : conforming to IS:1729-1979 with
cement caulked joints and fixing
Supplying and Fixing of 101.6 mm (4") CI soil plain Double junction : conforming to IS:1729-1979
with cement caulked joints and fixing
Supplying and Fixing of 152.4 mm (6") CI soil plain Double junction : conforming to IS:1729-1979
with cement caulked joints and fixing
Labour charges only fixing CI soil Double junctions with cement caulked joints and fixing as per site
requirements with standard practice
Supplying and Fixing of 75mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing -for 76.20 mm (3") C.I. Pipe
Supplying and Fixing of 75mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing -for 101.6 mm (4") C.I. Pipe
Supplying and Fixing of 75mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing -for 152.4 mm (6") C.I. Pipe
Supplying and Fixing of 115 mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing - for 76.20 mm (3") C.I. Pipe
Supplying and Fixing of 115 mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing - for 101.6 mm (4") C.I. Pipe
Supplying and Fixing of 115 mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing - for 152.4 mm (6") C.I. Pipe
Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing for 76.20 mm (3") C.I. Pipe
Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing for 101.6 mm (4") C.I. Pipe
Supplying and Fixing of 150 mm C.I. Offsets Ist quality conforming to IS:1729- 1979 with cement caulked
joints and fixing for 152.4 mm (6") C.I. Pipe
Labour charges only fixing CI soil Offsets with cement caulked joints and fixing as per site requirements
with standard practice
Supplying & fixing CI floor traps 1st quality ISI marked conforming to IS:1729- 1979 with C.P. Grating
fixing with white cement as per site requirements with standard practice for 100 mm dia Inlet- 75 mm (3")
outlet pipe
Supplying & fixing CI floor traps 1st quality ISI marked conforming to IS:1729- 1979 with C.P. Grating
fixing with white cement as per site requirements with standard practice for 100 mm dia Inlet - 100 mm
(4") outlet pipe

Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P.
Grating fixing with white cement as per site requirements with standard practice for 100 mm dia
Inlet- 75 mm (3") outlet pipe - 4 Kgs
Labour charges only for fixing CI Nahany/ Floor traps with C.P. Grating fixing with white cement as per site
requirements with standard practice
Boxing of Nahany traps in RCC floors
Boxing of W.C Trap in R.C.C floors
Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to IS:1729-1979 with
cement caulked joints and fixing as per site requirements with standard practice for 76.20 mm
(3") C.I. Pipe
Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to IS:1729-1979 with
cement caulked joints and fixing as per site requirements with standard practice for 101.6 mm
(4") C.I. Pipe
Supplying & fixing CI Collars (double socket) Ist quality ISI marked conforming to IS:1729-1979 with
cement caulked joints and fixing as per site requirements with standard practice for 152.4 mm
(6") C.I. Pipe

VITREOUS CHINAWARE - SANITARY APPLIANCES as per IS:2556 - 1974


Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-31981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm Long
Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-31981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 630 mm Long
Labour charges only for fixing Indian pattern W.C with "P" or "S" trap
Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 580 mm x 440 mm
Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI Mark: 630 mm x 450 mm
Labour charges only Fixing Orissa pan W.C with "P" or "S" trap
Supplying & Fixing porcelain foot rest for squatting I.W.C. (Rectangular pair) of sizes 250 mm x 125 mm x
15 mm thick each foot rest 1st quality ISI marked conforming to IS:2556-Part-10:1974
Labour charges only for fixing porcelain foot rest for squatting I.W.C.(Rectangular pair)
Providing Brick masonry seat for Orissa pan/ Indian W.C. using 2nd class bricks as per standard practice
Providing Cement Concrete Squatting plate for Orissa pan/ Indian W.C. in P.C.C. 1:2:4 as per standard
practice
Supplying & Fixing low down porcelain flushing tank 10 Lit Capacity Hindustan Sanitary ware/ parry/
Neycer with internal components
Labour charges only for fixing low down porcelain flushing tank with internal components
Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of
Hindustan / Neycer or Parryware make white glazed with 'P' trap

Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of
Hindustan / Neycer or Parryware make white glazed with 'S' trap
Labour charges only for fixing European Water Closet with 'P' or 'S' trap as per standard practice
Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or
plastic Buffers as per IS 2548-1996
Labour charges only for fixing plastic seat and lid for European water closet
Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or
'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra
solid seat cover of approved make with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC
inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all
respects: White Colour
Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or
'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra
solid seat cover of approved make with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC
inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all
respects: Coloured - Grade - I/ Grade - II
Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or
'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra
solid seat cover of approved make with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC
inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all
respects: Special Colour - Grade - III

Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
equivalent complete with standard CI brackets including wooden block: 660 x 460 mm - Single C.P.
Pillar cock

Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P.
Pillar cock
Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Double C.P.
Pillar cock
Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P.
Pillar cock

Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Double C.P.
Pillar cock
Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
equivalent complete with standard CI brackets including wooden block: 450 x 300 mm - Single C.P.
Pillar cock

Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore
Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or
equivalent complete with standard CI brackets including wooden block: 450 x 300 mm - Double C.P.
Pillar cock
Labour charges only for fixing Indian make Flat Back Wash Hand Basin with waste fittings like rubber
plug, chain, 32 mm nominal size C.P. Fitting Pillar Taps complete with standard CI brackets including
wooden block
Supplying and Fixing Pedestal for Wash Hand Basin

(H.S.W / Parry / Earthenware)

Labour charges only for fixing pedestal for wash hand basin
Supplying & Fixing 31.75 mm C.P bottle trap (Heavy type) Parryware or equivalent
Labour charges only for fixing bottle trap to the wash hand basin
Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal
flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995
Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995
with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974
fixed with screws complete Indian make (HSW/Parry/Neycer) : 410 x 265 x 305 mm
Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995
with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974
fixed with screws complete Indian make (HSW/Parry/Neycer) : 590 x 375 x 390 mm
Labour charges only Fixing flat back Bowl/ Half stall urinals with fixing C.P. Spreader and screws
complete
Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming to IS:2556-Part-51994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting
with parallel pipe thread conforming to IS:2963-1979 : 600 x 400 x 250
Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming to IS:2556-Part-51994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting
with parallel pipe thread conforming to IS:2963-1979 : 750 x 450 x 250
Labour charges only for fixing Vitreous china porcelain sinks with waste fittings, rubber plug, chain,
cantilever brackets etc.
a) S & F 609.6 x 457.2 x 254 mm RCC terrazzo finished sink (or constructed at site with 50.8mm thick)
brass plug and chain including CI cantilever brackets

b) - do - labour charges only

TAPS & FAUCETS


a) S & F 12.7 mm NP stop cock Indian make heavy duty Seiko/ Senior/ Nice/ Senior/ Nice or equivalent
b) - do - labour charges only
a) S & F concealed stop cock 12.7 mm (1/2") Indian Make heavy duty Seiko/ Senior/ Nice or equivalent
b) - do - labour charges only
a) S & F angle stop cock 12.7 mm dia first quality Indian Make heavy duty Seiko/ Senior/ Nice or
equivalent
b) - do - labour charges only
a) S&F 12.7 mm N.P bib tap Indian make heavy dutys Seiko/ Senior/ Nice or equivalent
b) - do - labour charges only
a) S&F 12.7mm N.P bib tap Indian make 3heavy duty
b) - do - labour charges only
a)S & F 31.75 mm brass plumber Union best Indian first quality
b) - do - labour charges only
a) S & F 12.7 mm brass stop cock Indian make heavy duty
b) - do - labour charges only
a) S & F 12.7 mm brass stop cock Indian make heavy duty
b) - do - labour charges only
a) S & F 12.7 mm brass bib cock Indian make heavy duty
b) - do - labour charges only
a) S & F 12.7 mm brass bib cock Indian make heavy duty
b) - do - labour charges only
S & F CP Long body bib cock fancy type deluxe heavy duty 12.7 mm dia Indian make Seiko/ Senior/ Nice
or equivalent
S & F CP Short body bib cock fancy type deluxeheavy duty 12.7 mm dia Indian make Seiko/ Senior/ Nice
or equivalent
S & F 12.7mm heavy duty dia high neck pillar cock 1st quality Indian make Seiko/ Senior/ Nice or
equivalent
a) S & F 12.7 mm heavy duty NP Swan Neck Pillar cock Seiko/ Senior/ Nice or equivalent
b) - do - labour charges only
a) S & F 12.7 mm heavy duty NP Sink cock Seiko/ Senior/ Nice or equivalent
b) - do - labour charges only
S&F 12.7 mm dia NP pillar cock heavy duty Ist quality Indian make Seiko/ Senior/ Nice or equivalent
S&F 12.7 mm dia NP push cock Ist quality
S&F 12.7 mm dia NP lift cock Ist quality
a)S & F 38.1 mm C.P waste coupling Half or Full Thread 1st Quality Indian
make Parryware or equivalent
b) - do - labour charges only
a) S & F 31.75 mm PVC bottle trap
b) - do - labour charges only
a) S& F 38.1 mm brass plumber union

b) - do - labour charges only


a)S & F 19.05 mm heavy duty NP stop cock Indian make with ISI mark Seiko/ Senior/ Nice or equivalent
b) - do - labour charges only

G.I. PIPES & FITTINGS


S& F GI union 12.7 mm Ist Quality
S& F GI union 19.05 mm Ist Quality
S& F GI union 25.4 mm Ist Quality
S& F GI union 31.75 mm Ist Quality
S& F GI union 38.1 mm Ist Quality
S& F GI union 50.8 mm Ist Quality
S& F GI connector 25.4 mm dia
S& F 12.7 mm GI 'T' A class Ist quality
S& F 31.75 mm dia GI bend Ist quality
S & F 31.75 mm dia GI 'T' 1st Quality
a) S & F 25.4 mm copper ball cock ith PVC ball Indian make ISI mark
b) - do - labour charges only
a) S & F 19.05 mm copper ball cock ith PVC ball Indian make ISI mark
b) - do - labour charges only
a)S & F 12.7 mm copper ball cock ith PVC ball Indian make ISI mark
b) - do - labour charges only
a) S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make
heavy type - 25 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make
heavy type - 20 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make
heavy type - 15 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make
heavy type - 32 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make
heavy type - 40 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make
heavy type - 50 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make
heavy type - 65 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make
heavy type - 80 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as
per IS-778 I-class heavy duty - 15 mm NB Size
b) - do - labour charges only

a) Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as
per IS-778 I-class heavy duty - 25 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as
per IS-778 I-class heavy duty - 40 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as
per IS-778 I-class heavy duty - 50 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as
per IS-778 I-class heavy duty - 20 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Vertical Check (Non return) Valve as per
IS-778 I-class heavy duty - 15 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Vertical Check (Non return) Valve as per
IS-778 I-class heavy duty - 20 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Vertical Check (Non return) Valve as per IS-778 I-class heavy duty 25 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Vertical Check (Non return) Valve as per IS-778 I-class heavy duty 32 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Vertical Check (Non return) Valve as per IS-778 I-class heavy duty 40 mm NB Size
b) - do - labour charges only
a) Supplying & fixing Gunmetal (GM) Vertical Check (Non return) Valve as per IS-778 I-class heavy duty 50 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 15 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 20 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 25 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 32 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 40 mm NB Size
b) - do - labour charges only
a) S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy
type - 50 mm NB Size
b) - do - labour charges only

a) S& F 15 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 20 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 25 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 32 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 40 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 20 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings &
labour charges complete
b) - do - labour charges only
a) S& F 32 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only
a) S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI
fittings including the cost of pipe & its fittings & labour charges complete
b) - do - labour charges only

S & F 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 with GI fittings
such as elbows tees couplings, nipples, plugs including excavation for trenches and refilling the
trenches complete except for GI bends union and GI connectors with checkout and socket Tata or
Zenith make or equivalent.
a)S & F 12.7 mm holder bat clamps
b) - do - labour charges only
a)S & F 19.05 mm holder bat clamps
b) - do - labour charges only
a)S & F 25.4 mm holder bat clamps
b) - do - labour charges only
a)S & F 38.1 mm holder bat clamps
b) - do - labour charges only
a) S & F 12.7 x 152.0 mm NP shower rose heavy
b) - do - labour charges only
a) S & F 12.7 x 137.0 mm NP shower rose heavy
b) - do - labour charges only
a) S & F 12.7 x 101.6 mm NP shower rose heavy
b) - do - labour charges only
a) S & F 12.7 x 88.9 CP fancy shower
b) - do - labour charges only
a) Supplying & fixing 12.7 mm GI drain pipe with plug for tanks (Mud valve) including making a hole
b) - do - labour charges only
a) Supplying & fixing 19.05 mm GI drain pipe with plug for tanks (Mud valve) including making a hole
b) - do - labour charges only
a) Supplying & fixing 25.4 mm GI drain pipe with plug for tanks (Mud valve) including making a hole
b) - do - labour charges only
a) Taking branch water connection from the existing 25.4 mm GI pipe including cutting threading,
etc, complete with fitting
b) - do - labour charges only
a) Taking branch water connection from the existing 19.05 mm GI pipe including cutting threading,
etc, complete with fitting,
b) - do - labour charges only
a) Taking branch water connection from the existing 12.7 mm GI pipe including cutting threading,
etc, complete with fitting,
b) - do - labour charges only
Supplying & fixing leather washers for 12.7 mm bib tap and stop cock
Supplying & fixing leather washers for 19.05 mm bib tap and stop cock
Supplying & Fixing 12.7 mm fibre washers
Supplying & Fixing 19.05 mm fibre washers

PVC PIPES & FITTINGS

a) Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer
approved brand & manufacture with cover and suitable locking arrangement & making necessary holes
for inlet & outlets and over flow pipes but without fittings & base support for tanks
b) - do - labour charges only
Supply of Plastic storage tank lid with hinges
Supply & Fixing 76.2 mm dia PVC elbow Ist quality
Supply & fixing 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality
Supply & Fixing 38.1 mm dia PVC solid waste pipe outlet
Supply & fixing Fancy PVC shelf including all fittings
Supply & fixing of PVC low level system parry ware, slim line with internal components & short bend: 10
Litres capacity Single Flush
Supply & fixing of PVC low level system parry ware, slim line with internal components & short bend: 10
litres capacity Dual Flush
Supply & fixing of PVC low level system parry ware, slim line with internal components & short bend: 8
Litres capacity single Flush
75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand
90 mm dia 3 M single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand
110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme or any
ISI Brand
75 mm dia 3 M
or any ISI Brand

Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme

90 mm dia 3 M
or any ISI Brand

Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme

110 mm dia 3 M
Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand

110 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
160 MM dia 3 M Double Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand
75 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand
90 mm dia 3 M single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand
110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme or any
ISI Brand
75 mm dia 3 M
or any ISI Brand

Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme

90 mm dia 3 M
Double Socket PVC/SWR pipe - 6 Kg/sq.cm Prince / Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 3 M
Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 1828.8 mm (6'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 1219. mm (4'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 914.4mm (3'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
75 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
90 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand
110 mm dia 609.6mm (2'-0") Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand

160 mm dia 3 M Double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand
75 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
90 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
75 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
90 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
75 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
90 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
110 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
75 mm dia - Cleaning Pipe - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
90 mm dia - Cleaning Pipe - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
110 mm dia - Cleaning Pipe - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any
ISI Brand)
75 mm dia - Single Tee - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 mm dia - Single Tee - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
110 mm dia - Single Tee - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
75 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any
ISI Brand)
90 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any
ISI Brand)
110 mm dia - Single Tee with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
75 mm dia - Double Tee - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 mm dia - Double Tee - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
110 mm dia - Double Tee - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
75 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
90 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
110 mm dia - Double Tee with Door - UPVC/SWR Pipe fittings (Prince / Sudhakar/ Kisan/ Supreme
or any ISI Brand)

75 mm dia - Single 'Y' - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan / Supreme or any ISI Brand)
90 mm dia - Single 'Y' - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan / Supreme or any ISI Brand)
110 mm dia - Single 'Y' - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
75 mm dia - Single 'Y' with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
90 mm dia - Single 'Y' with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
110 mm dia - Single 'Y' with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
75 mm dia - Double 'Y' - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 mm dia - Double 'Y' - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
110 mm dia - Double 'Y' - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
75 mm dia - Double 'Y' with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
90 mm dia - Double 'Y' with Door - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
110 mm dia - Double 'Y' with Door - UPVC/SWR Pipe fittings (Prince / Sudhakar/ Kisan/ Supreme
or any ISI Brand)
75 mm dia - Coupler - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 mm dia - Coupler - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
110 mm dia - Coupler - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 x 75 mm dia - Reducer - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
110 x 75 mm dia - Reducer - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
90 x 110
Brand)

mm dia - Reducer - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI

63 mm dia - Vent Cowl - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
75 mm dia - Vent Cowl - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 mm dia - Vent Cowl - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
110 mm dia - Vent Cowl - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
40 mm dia - Pipe Clip - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan / Supreme or any ISI Brand)
50 mm dia - Pipe Clip - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
63 mm dia - Pipe Clip - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)

75 mm dia - Pipe Clip - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 mm dia - Pipe Clip - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
110 mm - Pipe Clip - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
160 mm dia - Pipe Clip - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
P' Trap ( Small without Air vent ) 110 mm - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or
any ISI Brand)
P' Trap ( Small with Air vent ) 110 mm - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or
any ISI Brand)
P' Trap (Big with Air vent ) 110 mm - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
P' Trap ( Big without Air vent ) 110 mm - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or
any ISI Brand)
Floor Trap (Bell Mouth ) 110 mm - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
Bell Mouth Trap 7 " ( 177.8 mm) - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
3" (76.2 mm ) Nahany Trap ( without Jali without inlet)UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
4" (101.6 mm ) Nahany Trap ( without inlet with out Jali)UPVC/SWR Pipe fittings (Prince/ Sudhakar/
Kisan/ Supreme or any ISI Brand)
Mini Trap - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
3" (76.2 mm ) Nahany Trap with Jali - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or
any ISI Brand)
4" (101.6) multi floor trap with out Jalli- UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
Round Jali - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
Square tile & Jalli - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
Pipe connector ( with LIP ring) - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
Pipe connector ( with out LIP ring) - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
4" (101.6 mm ) Floor Trap - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
5" (127.mm ) floor Trap - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
75 mm dia - Door cap - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 mm dia - Door cap - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)

110 mm dia - Door cap - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
75 mm dia - Socket plug - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/Supreme or any ISI Brand)
90 mm dia - Socket plug - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
110 mm dia - Socket plug - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
75 mm dia - Rubber ring for Socket - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
90 mm dia - Rubber ring for Socket - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
110 mm dia - Rubber ring for Socket - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
75 mm dia - Door Socket - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
90 mm dia - Door Socket - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
110 mm dia - Door Socket - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI
Brand)
LIP ring 110 mm - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
Rubber Lubricant - 100 Grams
Rubber Lubricant - 250 Grams
Rubber Lubricant - 500 Grams
Rubber Lubricant - 1000 Grams
P' Trap with lip UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme or any ISI Brand)
50 ml - Solvent Cement
100 ml - Solvent Cement
250 ml - Solvent Cement
500 ml - Solvent Cement
1000 ml - Solvent Cement
110mm x 90 mm - Internal Reducer - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/ Supreme
or any ISI Brand)
160 mm x 110 mm - Internal Reducer - UPVC/SWR Pipe fittings (Prince/ Sudhakar/ Kisan/
Supreme or any ISI Brand)
Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc
any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with
solvent jointing as per standard practice
CENTRIFUGAL CAST IRON PIPES & FITTNGS AS PER IS: 3989 - 1984
75 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
100 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
150 mm dia CI (spun) soils Waste & Ventilating pipe (3 M)
75 mm dia CI (spun) soils Waste & Ventilating pipe (3 M) Double socket
100 mm dia CI (spun) soils Waste & Ventilating pipe (3 M) Double socket
75 mm dia 9'-0" (2743.2 mm) CI (Spun) pipes

100 mm dia 9'-0" (2743.2 mm) CI (Spun) pipes


75 mm dia 8'-0" (2438.4 mm) CI (Spun) pipes
100 mm dia 8'-0" (2438.4 mm) CI (Spun) pipes
75 mm dia 6'-0" (1828.8 mm) CI (Spun) pipes
100 mm dia 6'-0" (1828.8 mm) CI (Spun) pipes
75 mm dia 6'-0" (1828.8 mm) Double Socket CI (Spun) pipes
100 mm dia 6'-0" (1828.8 mm) Double Socket CI (Spun) pipes
75 mm dia Cut pipes (pieces) 1 foot (304.8 mm) CI (Spun) fittings
100 mm dia Cut pipes (pieces) 1 foot (304.8 mm) CI (Spun) fittings
75 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
100 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
150 mm dia Cut pipes (pieces) 1'.6" (457.2 mm) CI (Spun) fittings
75 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
100 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
150 mm dia Cut pipes (pieces ) 2 feet (609.6 mm) CI (Spun) fittings
75 mm dia Cut pipes (pieces ) 3 feet (914.4 mm) CI (Spun) fittings
100 mm dia Cut pipes (pieces ) 3 feet (914.4 mm) CI (Spun) fittings
75 mm dia Cut pipes (pieces ) 4 feet (1219.2 mm) CI (Spun) fittings
100 mm dia Cut pipes (pieces ) 4 feet (1219.2 mm) CI (Spun) fittings
75 mm dia Plain Bend - CI (Spun) fittings
100 mm dia Plain Bend - CI (Spun) fittings
150 mm dia Plain Bend - CI (Spun) fittings
75 mm dia Door Bend - CI (Spun) fittings
100 mm dia Door Bend - CI (Spun) fittings
150 mm dia Door Bend - CI (Spun) fittings
75 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
100 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
150 mm dia Plain Bend 45 Degrees - CI (Spun) fittings
75 mm dia Door Bend 45 Degrees - CI (Spun) fittings
100 mm dia Door Bend 45 Degrees - CI (Spun) fittings
150 mm dia Door Bend 45 Degrees - CI (Spun) fittings
Horn Bend Plain 101.6 x 50.8 mm (4" x 2") 100 mm dia - CI (Spun) fittings
Horn Bend door 101.6 x 50.8 mm (4" x 2") 100 mm dia - CI (Spun) fittings
75 mm dia Heel Rest Bend - CI (Spun) fittings
100 mm dia Heel Rest Bend - CI (Spun) fittings
150 mm dia Heel Rest Bend - CI (Spun) fittings
75 mm dia Single Branch Plain "T" - CI (Spun) fittings
100 mm dia Single Branch Plain "T" - CI (Spun) fittings
150 mm dia Single Branch Plain "T" - CI (Spun) fittings
75 mm dia Single Branch Door "T" - CI (Spun) fittings
100 mm dia Single Branch Door "T" - CI (Spun) fittings
150 mm dia Single Branch Door "T" - CI (Spun) fittings
75 mm dia Single Branch plain "Y" - CI (Spun) fittings

100 mm dia Single Branch plain "Y" - CI (Spun) fittings


150 mm dia Single Branch plain "Y" - CI (Spun) fittings
75 mm dia Single Branch Door "Y" - CI (Spun) fittings
100 mm dia Single Branch Door "Y" - CI (Spun) fittings
150 mm dia Single Branch Door "Y" - CI (Spun) fittings
75 mm dia Double Branch Plain "T" - CI (Spun) fittings
100 mm dia Double Branch Plain "T" - CI (Spun) fittings
75 mm dia Double Branch Door "T" - CI (Spun) fittings
100 mm dia Double Branch Door "T" - CI (Spun) fittings
75 mm dia Double Branch Plain "Y" - CI (Spun) fittings
100 mm dia Double Branch Plain "Y" - CI (Spun) fittings
75 mm dia Double Branch Door "Y" - CI (Spun) fittings
100 mm dia Double Branch Door "Y" - CI (Spun) fittings
75 mm dia Shoe Bend - CI (Spun) fittings
100 mm dia Shoe Bend - CI (Spun) fittings
150 mm dia Shoe Bend - CI (Spun) fittings
75 mm dia Collar - CI (Spun) fittings
100 mm dia Collar - CI (Spun) fittings
150 mm dia Collar - CI (Spun) fittings
75 mm dia Cowl - CI (Spun) fittings
100 mm dia Cowl - CI (Spun) fittings
150 mm dia Cowl - CI (Spun) fittings
75 mm dia Offset 3" (76.2 mm ) projection - CI (Spun) fittings
100 mm dia Offset 3" (76.2 mm ) projection - CI (Spun) fittings
150 mm dia Offset 3" (76.2 mm ) projection - CI (Spun) fittings
75 mm dia Offset 6" (152.4mm ) projection - CI (Spun) fittings
100 mm dia Offset 6" (152.4mm ) projection - CI (Spun) fittings
150 mm dia Offset 6" (152.4mm ) projection - CI (Spun) fittings
75 mm dia Long Door Bend - CI (Spun) fittings
100 mm dia Long Door Bend - CI (Spun) fittings
75 mm dia Hand Hole pipe ( Inspection pipe)
100 mm dia Hand Hole pipe ( Inspection pipe)
150 mm dia Hand Hole pipe ( Inspection pipe)
75 mm dia P Traps - CI (Spun) fittings
100 mm dia P Traps - CI (Spun) fittings
4" x 3" (101.6 mm x 76.2mm ) P. Traps 100 mm dia - CI (Spun) fittings
4" x 3" (101.6 mm x 76.2mm ) Vent Traps 100 mm dia - CI (Spun) fittings
4" x 3" (101.6 mm x 76.2mm ) Reducer 75 mm dia - CI (Spun) fittings
6" x 4" (152.4 mm x101.6 mm ) Reducer 75 mm dia - CI (Spun) fittings
3" x 2" ( 76.2 mm x 50.8 mm ) plain T 75 mm dia - CI (Spun) fittings
3" x 2" ( 76.2 mm x 50.8 mm ) Door T 75 mm dia - CI (Spun) fittings
3" x 2" ( 76.2 mm x 50.8 mm ) Plain Y 75 mm dia - CI (Spun) fittings
3" x 2" ( 76.2 mm x 50.8 mm ) Door Y 75 mm dia - CI (Spun) fittings

4" x 3" (101.6 mm x 76.2mm ) Plain T 75 mm dia - CI (Spun) fittings


4" x 3" (101.6 mm x 76.2mm ) Door T 75 mm dia - CI (Spun) fittings
4" x 3" (101.6 mm x 76.2mm ) Plain Y 75 mm dia - CI (Spun) fittings
4" x 3" (101.6 mm x 76.2mm ) Door Y 75 mm dia - CI (Spun) fittings
6" x 4" (152.4 mm x101.6 mm ) Plain T 75 mm dia - CI (Spun) fittings
6" x 4" (152.4 mm x101.6 mm ) Door T 75 mm dia - CI (Spun) fittings
6" x 4" (152.4 mm x101.6 mm ) Plain Y 75 mm dia - CI (Spun) fittings
6" x 4" (152.4 mm x101.6 mm ) Door Y 75 mm dia - CI (Spun) fittings
75 mm dia Plain " T" 27 " (685.8 mm ) Special Types of Long Fittings
100 mm dia - Plain " T" 27 " (685.8 mm ) Special Types of Long CI (Spun)
fittings
75 mm dia Door "T" 27" (685.8 mm ) Special Types of Long CI (Spun) fittings
100mm dia Door "T" 27" (685.8 mm ) Special Types of Long CI (Spun) fittings
75 mm dia Plain " Y" 27" (685.8 mm) Special Types of Long CI (Spun) fittings
100mm dia Plain " Y" 27" (685.8 mm) Special Types of Long CI (Spun) fittings
75 mm dia Door " Y" 27" (685.8 mm) Special Types of Long CI (Spun) fittings
100mm dia Door " Y" 27" (685.8 mm) Special Types of Long CI (Spun) fittings
MISCELLANEOUS ITEMS
a) Supplying & Fixing solder joints up to 50.8 mm dia
b) - do - labour charges only
a) Supplying & Fixing solution joints up to 50.8 dia Ist quality.
b) - do - labour charges only
Chiselling the stone masonry wall for fixing of wooden blocks including
finishing as directed by the department
Chiselling the stone masonry wall and repairs as directed by the department.
Chiselling the brick masonry wall and repairs as directed by the department.
a) S & F NP telephonic shower spray set & valve mixer with rest and all fittings complete (ARK/ESSCO or
equivalent make)
b) - do - labour charges only
a) S & F NP shower spray fancy with NP Flexible pipe
b) - do - labour charges only
a) S & F NP cover for Nahany trap
b) - do - labour charges only
a) Painting the flushing tank with white enamel paint
b) - do - labour charges only
S & F internal fittings for flush tank Parryplast wonder flush or equivalent
Repairing and over hauling flushing tank
a) Supplying & Fixing NP chain rubber and plug for basin
b) - do - labour charges only
a) S & F 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium
screws
b) - do - labour charges only
a) S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with
brackets and aluminium screws
b) - do - labour charges only

a) S & F 609.6 mm long 127 mm wide plate glass shelf with superior quality
aluminium railing complete with aluminium screws
b) - do - labour charges only
a) S & F 609.6 mm long 127 mm wide plate glass shelf only
b) - do - labour charges only
a) S & F NP soap dish heavy type with NP SCREWS
b) - do - labour charges only
a) S &F NP holder brackets with screws
b) - do - labour charges only
a) S & F liquid soap container NP metallic with NP brackets and screws.
b) - do - labour charges only
a) S & F 31.75 mm C.P TRAPS
b) - do - labour charges only
a) Supplying & fixing 88.9 mm A.C cowls
b) - do - labour charges only
a) Supplying & fixing A.C Cowl 63.5 mm dia
b) - do - labour charges only
Removing and refixing W.C s
Removing and refixing wash hand basins of any size with fittings complete
a) S & F 76.2 x 101.6 mm teak wood block complete
b) - do - labour charges only
Cutting holes in C.C; basement & repairs Labour charges only
Cutting holes in stone masonry & basement and repairs Labour charges only
Cutting holes in Brick masonry & repairs Labour charges only
Cutting holes in RCC slab floor & repairs Labour charges only
a) Supplying & Fixing 12.7 mm PVC connection with brass union nut C.P
coated
b) - do - labour charges only
a) S & F 12.7 mm .M.P couplings
b) - do - labour charges only
a) S & F 19.05 mm M.P couplings
b) - do - labour charges only
a) S& F MP coupling 25.4 mm dia
a) S & F PVC Rubber adopter for LLC and bend
b) - do - labour charges only
a) S& F 31.75 mm Brass union nuts
b) - do - labour charges only
a) S& F 38.1 mm Brass union nuts
b) - do - labour charges only
a) Constructing Brick masonry chamber over the gully trap or peet valve and
fitted with 304.8 x 228.6 m size CI frame and hinged cover.
b) - do - labour charges only
a) Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including
plastering and finishing etc. complete.

b) - do - labour charges only


a) Supplying & fixing 304.8 x 228.6 mm CI frame & cover over gully taps
b) - do - labour charges only
a) Supplying & fixing CI Nahany trap grating
b) - do - labour charges only
a) Supplying & fixing CI gully trap grating
b) - do - labour charges only
a) Supplying & fixing valves for brass ball cocks 25.4 mm dia
b) - do - labour charges only
a) Supplying & fixing 12.7 m valve for bib tap or stop cocks
b) - do - labour charges only
a) Supplying & fixing 19.05 m valve for bib tap or stop cocks
b) - do - labour charges only
Removing 12.7 mm GI pipe and refixing the same
Removing 19.05 mm GI pipe and refixing the same
Removing 25.4 mm GI pipe and refixing the same
Removing 38.1 mm GI pipe and refixing the same
Removing 50.8 mm GI pipe and refixing the same
Cleaning the W.C with acid and Vim powder
Cleaning the Urinal with acid and Vim power
Cleaning the wash basin with acid and Vim powder
Cleaning the E.W.C with acid and Vim power
Supplying & fixing 914.4 x 457.2 mm CI man hole frame and cover (light
weight) 30 Kgs
Supplying & fixing 602 x 602 mm CI man hole frame and cover (light weight)
30 Kgs
b) - do - labour charges only
a) Supplying & fixing CI steps for septic tank.
b) - do - labour charges only
a) Supplying & fixing 50.8 cm dia C.I. Man hole frame & cover for 914.4 mm
dia chamber (20 Kgs - Light weight)
b) - do - labour charges only
a) Supplying & fixing 50.8 cm dia C.I. Man hole frame & cover for 914.4 mm
dia chamber (Medium weight) as per IS:1726 - 40 Kgs
b) - do - labour charges only
Cost. 50.8 mm thick RCM baffle wall with 2.267 Kg steel & rabbit wire mesh in CM 1:3 with fine rendering
in neat cement labour charges Only
a) Cost. 50.8 mm RCC partition wall
b) - do - labour charges only
a) S & F double layer of bamboo matting tarred on both sides.
b) - do - labour charges only
Removing of 101.6 m or 76.2 mm CI pipe
a) Supplying & fixing 76.2 mm W.I clamps

b) - do - labour charges only


a) Supplying & fixing NP coat hook
b) - do - labour charges only
a) Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x
457 .2 mm
b) - do - labour charges only
a) Supplying & fixing GI pipe plug of size 12.7 mm dia
b) - do - labour charges only
a) Supplying & fixing 19.06 mm dia GI plug
b) - do - labour charges only
a) Supplying and fixing 38.1 mm dia of GI plug
b) - do - labour charges only
a) Supplying & fixing 50.8 mm dia of GI PLUG
b) - do - labour charges only
a) Supplying & fixing 76.2 mm dia of GI PLUG
b) - do - labour charges only
a) Supplying & fixing C.P flange.
b) - do - labour charges only
a) Supplying & fixing stainless steel sink size 36" x 18" (914.4x457.2mm) 1 mm thick with accessories
b) - do - labour charges only
a) Supplying & fixing SINGLE BOWL stainless steel sink size 24"x18"x8 " (609.6 x 457.2 x 203.2mm) 1
mm thick with accessories
b) - do - labour charges only
a) Supplying & fixing stainless
1 mm thick with accessories

steel

sink

size

20"

x18"

" (508x457.2x203.2mm)

b) - do - labour charges only


Supplying & fixing 4 " x 24 " (101.6x609.6mm) white glazed porcelain channel fixed in brick masonry white
cement pointing.
Supply & Fixing of steel surgical long elbow action handle 12.7 mm dia bib
cock Indian make heavy type including all materials
Supply & fixing 2 1/2" (63.5mm) dia Sluice valve ISI mark with 2 Nos. flanges,
8 nos, 3/4" dia nuts & bolts and all necessary washers and packing materials etc. complete
Supply & fixing porcelain P' trap
Supplying & fixing oval shape basin white (520x410mm) parry or equivalent
Supply & fixing RCC cover 22" dia with nominal reinforcement 3 " thick and
hooks for lifting
Supply & fixing cp spl. Grating with frame and cover of 1st quality
Supply & fixing towel rod (CP) of 24" long and 3/4 " dia
Supply & fixing of LLC handle set 1st quality
Mechanical Cleaning of water sumps with pumps & UV disinfecting
Supply & fixing 4" dia CP thimble pipe: 150 mm long
Supply & fixing 4" dia CP thimble pipe: 220 mm long
Supply & fixing 4" dia CP thimble pipe: 300 mm long

Supply & fixing CP long bend


Supply & fixing CP short bend
Supplying & fixing 15 mm bib tap with flange Chromeum plated Jaquar make
queen series/ Jupiter Aqua Lines-JALor equivalent series
Supply & fixing bib cock cum health faucet with 1 m long flexible tube and
wall hook of Jaquar make queen series with 7 years warranty Chrome plated
/ Jupiter Aqua Lines-JALor equivalent series
Supply & fixing bib cock cum health faucet with 1 m long flexible tube and
wall hook of Jaquar make queen series with 7 years warranty: Ivory gold/ Jupiter Aqua Lines-JALor
equivalent series
Supply & fixing pillar cock Jaquar make Queen series with 7 years warranty:
Chrome plated / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing pillar cock Jaquar make Queen series with 7 years warranty:
Ivory gold / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing Angular stop cocks with wall flange Jaquar make Queen series
with 7 years warranty: Chrome plated/ Jupiter Aqua Lines-JALor equivalent series
Supply & fixing Angular stop cocks with wall flange Jaquar make Queen series
with 7 years warranty: Ivory gold / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing Waste coupling Jaquar make with 7 years warranty: Chrome plated / Jupiter Aqua LinesJALor equivalent series
Supply & fixing of Bottle trap Jaquar make with 7 years warranty: Chrome
plated / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing of Bottle trap Jaquar make with 7 years warranty: Ivory gold /
Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing copper pipe 450 mm long with nuts & washers Jaquar make
with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing copper pipe 450 mm long with nuts & washers Jaquar make
with 7 years warranty: Ivory gold / Jupiter Aqua Lines-JALor equivalent series
Supply and fixing wall mirror with provision for over head shower and 115 mm long bend pipe with wall
flange Jaquar make queen series with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JALor
equivalent series
Supply and fixing wall mirror with provision for over head shower and 115 mm long bend pipe with wall
flange Jaquar make queen series with 7 years warranty: Ivory gold / Jupiter Aqua Lines-JALor equivalent
series
Supply & fixing overhead shower rose with revolving joint and 150 mm long swivel shower arm Jaquar
make queen series. with 7 years warranty: Chrome plated / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing overhead shower rose with revolving joint and 150 mm long
swivel shower arm Jaquar make queen series. with 7 years warranty: Ivory
Gold / Jupiter Aqua Lines-JALor equivalent series
Supply and Fixing Wall Mixer with Telephonic shower arrangement with
crutch and flexible pipe Jaquar series Ivory gold colour for bath tub. with 7
years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing Bath tub overflow set complete with over flow cap, 450 mm
Ball chain with rubber plug & union bend with brass nut Jaquar make, Ivory gold colour. with 7 years
warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing sink cock with regular swinging spout with wall flange
chromeplated Jaquar make Queen series with 7 years warranty / Jupiter Aqua
Lines-JALor equivalent series

Supply & fixing soap dish Jaquar make queen series: with 7 years warranty:
Chrome plated / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing soap dish Jaquar make queen series: with 7 years warranty:
Ivory Gold / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing of toilet paper holder Jaquar make Queen series. with 7 years
warranty: Chrome plated / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing of toilet paper holder Jaquar make Queen series. with 7 years warranty: Ivory Gold /
Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Towel ring Jaquar make Queen series with 7 years
warranty: Chrome plated / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Towel ring Jaquar make Queen series with 7 years
warranty: Ivory Gold / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of towel coat hook Jaquar make Queen series with 7 years
warranty: Chrome plated / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of towel coat hook Jaquar make Queen series with 7 years warranty: Ivory Gold / Jupiter
Aqua Lines-JALor equivalent series
Supply & Fixing of Towel rod 24 " Jaquar make Queen series Ivory gold colour
with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Tumbler holder Jaquar make Queen series, Ivory gold
colour with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing of Glass shelf 22" Jaquar make Queen series, Ivory gold colour
with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Bibcock cum Health Faucet with 1m long tube and wall
hook of Jaquar Continental series, Chrome Finish with 7 years warranty / Jupiter Aqua Lines-JALor
equivalent series
Supply & Fixing of Bibcock Jaquar Continental series, Chrome Finish with 7
years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Pillar cock Jaquar Continental series, Chrome Finish with 7 years warranty / Jupiter
Aqua Lines-JALor equivalent series
Supply & Fixing of Angular stopcock with wall flange Jaquar Continental series,Chrome finish with 7 years
warranty / Jupiter Aqua Lines-JALor equivalent
series
Supply fixing of Waste coupling Jaquar make, Chrome finish with 7 years
warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Bottle Trap Jaquar make, Chrome finish with 7 years warranty / Jupiter Aqua
Lines-JALor equivalent series
Supply & Fixing of copper pipe 450mm long with nuts & washers Jaquar make,
Chrome Finish with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Wall Mixer with provision for overhead shower and 115mm
long bend pipe with wall flange Jaquar make Continental series, Chrome finish with 7 years warranty /
Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Exclusive overhead shower with 190mm long light body
shower arm Jaquar make Continental series, Chrome finish with 7 years warranty/ Jupiter Aqua
Lines-JALor equivalent series
Supply & Fixing wall mixer with telephonic shower arrangement with crutch
and telephone shower with flexible tube Jaquar make Continental series Chrome colour for bath tub
with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series

Supply & Fixing bath tub over flow set complete with over flow cap,450mm ball chain with rubber plug
7 Union bend with brass nuts Jaquar make, Chrome colour with 7 years warranty / Jupiter Aqua
Lines-JALor equivalent series
Supply & Fixing Sink cock with regular swinging spout with flange chrome
plated Jaquar make Continental series with 7 years warranty / Jupiter Aqua
Lines-JALor equivalent series
Supply & Fixing soap dish Jaquar make Continental series, Chrome Finish with 7 years warranty / Jupiter
Aqua Lines-JALor equivalent series
Supply & Fixing of Toilet paper holder Jaquar make Continental series,
Chrome finish with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Towel Ring Jaquar make Continental series, Chrome finish with 7 years warranty /
Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing Double coat hook Jaquar make Continental series, Chrome finish with 7 years warranty /
Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of towel rail 24'' Jaquar make Continental series, Chrome finish with 7 years warranty /
Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Tumbler
holder Jaquar make Continental series,
warranty / Jupiter Aqua Lines-JALor equivalent series

Chrome finish with 7 years

Supply & Fixing of Glass shelf 22'' Jaquar make Continental series, Chrome finish with 7 years warranty /
Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Bibcock cum Health Faucet with 1m long tube and wall hook of Jaquar
Florentine(Quarter turn) series, Chrome Finish with 7 years warranty / Jupiter Aqua Lines-JALor
equivalent series
Supply & Fixing of Bibcock Jaquar Florentine (Quarter turn)series, Chrome Finish with 7 years warranty /
Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Pillar cock Jaquar Florentine(Quarter turn) series, Chrome
Finish with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Angular stopcock with wall flange Jaquar Florentine(
Quarter turn)series, Chrome finish with 7 years warranty / Jupiter Aqua Lines- JALor equivalent series
Supply & Fixing of Bottle Trap Jaquar make, Chrome finish with 7 years warranty / Jupiter Aqua
Lines-JALor equivalent series
Supply & Fixing of Wall Mixer with provision for overhead shower and 115mm long bend pipe with wall
flange Jaquar make Florentine(Quarter turn) series, Chrome finish with 7 years warranty / Jupiter Aqua
Lines-JALor equivalent series
Supply & Fixing wall mixer with telephonic shower arrangement with crutch and telephone shower with
flexible tube Jaquar make Florentine(Quarter
turn) series Chrome colour for bath tub with 7 years warranty / Jupiter Aqua
Lines-JALor equivalent series
Supply & Fixing Sink cock with regular swinging spout with flange
Florentine(Quarter turn) series with 7 years warranty /
Jupiter Aqua Lines-JALor equivalent series

chrome plated Jaquar make

Supply & Fixing of Rose shower with revolving ball joint & 115mm long
shower arm with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & Fixing of Jaquar make chrome plated Metro pole flush valve
concealed type with cover plate 40mm size with 7 years warranty / Jupiter
Aqua Lines-JALor equivalent series

Supply & Fixing of Jaquar make Sensotronic sensor faucet for wash basin,
Chrome plated with 7 years warranty / Jupiter Aqua Lines-JALor equivalent series
Supply & fixing of Jaquar make Sensotronic concealed type flushing valve for
urinal complete set with installation box with control cock, Chrome plated with 7 years warranty / Jupiter
Aqua Lines-JALor equivalent series
Supply & fixing of Jaquar make Auto closing system pillar cock for wash basin,Chrome plated with 7 years
warranty / Jupiter Aqua Lines-JALor equivalent series
Supply& Fixing of Jaquar make Auto Closing system Bibcock, Chrome plated with 7 years warranty /
Jupiter Aqua Lines-JALor equivalent series
S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite
pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black
for hot & cold water supply, capable to withstand pressure up to 80 C including all special
composite fittings, plastic & brass blend inserts for elbows, tees, reducers, couplers, connectors etc
complete for external works including laying pipes, fixing in position, testing and commissioning etc : 16
mm OD pipe
S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite
pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black
for hot & cold water supply, capable to withstand pressure up to 80 C including all special
composite fittings, plastic & brass blend inserts for elbows, tees, reducers, couplers, connectors etc
complete for external works including laying pipes, fixing in position, testing and commissioning etc : 20
mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete for external works
including laying pipes, fixing in position, testing and commissioning etc :
25mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete for external works
including laying pipes, fixing in position, testing and commissioning etc : 32 mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete for external works
including laying pipes, fixing in position, testing and commissioning etc : 40 mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete for external works
including laying pipes, fixing in position, testing and commissioning etc : 50 mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete with MS Iron
clamps at 1.0 M spacing including cutting, chasing walls, making good, laying pipes, fixing in position,
testing and commissioning etc 16 mm OD pipe
S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite
pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete with MS Iron
clamps at 1.0 M spacing including cutting, chasing walls, making good, laying pipes, fixing in position,
testing and commissioning etc 20 mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic
& brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete with MS Iron
clamps at 1.0 M spacing including cutting, chasing walls, making good, laying pipes, fixing in position,
testing and commissioning etc 25mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete with MS Iron
clamps at 1.0 M spacing including cutting, chasing walls, making good, laying pipes, fixing in position,
testing and commissioning etc 32 mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete with MS Iron
clamps at 1.0 M spacing including cutting, chasing walls, making good, laying pipes, fixing in position,
testing and commissioning etc 40 mm OD pipe

S&F KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite


pressure pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water
supply, capable to withstand pressure up to 80 C including all special composite fittings, plastic &
brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete with MS Iron
clamps at 1.0 M spacing including cutting, chasing walls, making good, laying pipes, fixing in position,
testing and commissioning etc 50 mm OD pipe

S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure


pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water supply, capable
to withstand pressure up to 80 C including all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc complete including excavating trenches up to 1.0 M
deep laying pipes, fixing in position, testing, refilling excavated earth and commissioning etc 16 mm OD
pipe
S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure
pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water supply, capable
to withstand pressure up to 80 C including all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc complete including excavating trenches up to 1.0 M
deep laying pipes, fixing in position, testing, refilling excavated earth and commissioning etc 20 mm OD
pipe

S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure


pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water supply, capable
to withstand pressure up to 80 C including all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc complete including excavating trenches up to 1.0 M
deep laying pipes, fixing in position, testing, refilling excavated earth and commissioning etc 25mm OD
pipe
S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure
pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water supply, capable
to withstand pressure up to 80 C including all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc complete including excavating trenches up to 1.0 M
deep laying pipes, fixing in position, testing, refilling excavated earth and commissioning etc 32 mm OD
pipe
S&F Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure
pipes conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water supply, capable
to withstand pressure up to 80 C including all special composite fittings, plastic & brass blend inserts
for elbows, tees, reducers, couplers, connectors etc complete including excavating trenches up to 1.0 M
deep laying pipes, fixing in position, testing, refilling excavated earth and commissioning etc 40 mm OD
pipe

Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC


Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube
Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR
13.5 pipes are made from idential CPVC compounds having the same physical
Properties for Hot and Cold Water (IS 15778:2007)
15.90mm OD Pipe - SDR 13.5
22.20mm OD Pipe - SDR 13.5
28.60mm OD Pipe - SDR 13.5
34.90mm OD Pipe - SDR 13.5
41.30mm OD Pipe - SDR 13.5
54.00mm OD Pipe - SDR 13.5
15.90mm OD Pipe - SDR 11
22.20mm OD Pipe - SDR 11
28.60mm OD Pipe - SDR 11
34.90mm OD Pipe - SDR 11
41.30mm OD Pipe - SDR 11
54.00mm OD Pipe - SDR 11
Supply of 20mm x 1.9mm PN 10/PPR pipe conforming to DIN Standards
8077/8078
Supply of 25mm x 2.3mm PN 10/PPR pipe conforming to DIN Standards
8077/8078
Supply of 32mm x 2.9mm PN 10/PPR pipe conforming to DIN Standards
8077/8079
Supply of 40mm x 3.7mm PN 10/PPR pipe conforming to DIN Standards
8077/8079
Supply of 50mm x 4.6mm PN 10/PPR pipe conforming to DIN Standards
8077/8080
Supply of 63mm x 5.8mm PN 10/PPR pipe conforming to DIN Standards
8077/8081

Supply of 75mm x 6.8mm PN 10/PPR pipe conforming to DIN Standards


8077/8082
Supply of 90mm x 8.2mm PN 10/PPR pipe conforming to DIN Standards
8077/8083
Supply of 110mm x 10mm PN 10/PPR pipe conforming to DIN Standards
8077/8084
Supply of 20mm x 2.8mm PN 16/PPR pipe conforming to DIN Standards
8077/8078
Supply of 25mm x 3.5mm PN 16/PPR pipe conforming to DIN Standards
8077/8078
Supply of 32mm x 4.4mm PN 16/PPR pipe conforming to DIN Standards
8077/8079
Supply of 40mm x 5.5mm PN 16/PPR pipe conforming to DIN Standards
8077/8079
Supply of 50mm x 6.9mm PN 16/PPR pipe conforming to DIN Standards
8077/8080
Supply of 63mm x 8.6mm PN 16/PPR pipe conforming to DIN Standards
8077/8081
Supply of 75mm x 10.3mm PN 16/PPR pipe conforming to DIN Standards
8077/8082
Supply of 90mm x 12.3mm PN 16/PPR pipe conforming to DIN Standards
8077/8083
Supply of 110mm x 15.1mm PN 16/PPR pipe conforming to DIN Standards
8077/8084
Supply of 20mm x 3.4mm PN 20/PPR pipe conforming to DIN Standards
8077/8078
Supply of 25mm x 4.2mm PN 20/PPR pipe conforming to DIN Standards
8077/8078
Supply of 32mm x 5.4mm PN 20/PPR pipe conforming to DIN Standards
8077/8079
Supply of 40mm x 6.7mm PN 20/PPR pipe conforming to DIN Standards
8077/8079
Supply of 50mm x 8.3mm PN 20/PPR pipe conforming to DIN Standards
8077/8080
Supply of 63mm x 10.5mm PN 20/PPR pipe conforming to DIN Standards
8077/8081
Supply of 75mm x 12.5mm PN 20/PPR pipe conforming to DIN Standards
8077/8082
Supply of 90mm x 15mm PN 20/PPR pipe conforming to DIN Standards
8077/8083
Supply of 110mm x 18.3mm PN 20/PPR pipe conforming to DIN Standards
8077/8084
Supply of 20mm PPR Socket conforming to DIN Standards 8077/8084
Supply of 25mm PPR Socket conforming to DIN Standards 8077/8085
Supply of 32mm PPR Socket conforming to DIN Standards 8077/8086
Supply of 40mm PPR Socket conforming to DIN Standards 8077/8087
Supply of 50mm PPR Socket conforming to DIN Standards 8077/8088
Supply of 63mm PPR Socket conforming to DIN Standards 8077/8089
Supply of 75mm PPR Socket conforming to DIN Standards 8077/8090

Supply of 90mm PPR Socket conforming to DIN Standards 8077/8091


Supply of 110mm PPR Socket conforming to DIN Standards 8077/8092
Supply of 32mm PPR Core Flange conforming to DIN Standards 8077/8086
Supply of 40mm PPR Core Flange conforming to DIN Standards 8077/8087
Supply of 50mm PPR Core Flange conforming to DIN Standards 8077/8088
Supply of 63mm PPR Core Flange conforming to DIN Standards 8077/8089
Supply of 75mm PPR Core Flange conforming to DIN Standards 8077/8090
Supply of 90mm PPR Core Flange conforming to DIN Standards 8077/8091
Supply of 110mm PPR Core Flange conforming to DIN Standards 8077/8092
Supply of 20mm PPR Elbow conforming to DIN Standards 8077/8084
Supply of 25mm PPR Elbow conforming to DIN Standards 8077/8085
Supply of 32mm PPR Elbow conforming to DIN Standards 8077/8086
Supply of 40mm PPR Elbow conforming to DIN Standards 8077/8087
Supply of 50mm PPR Elbow conforming to DIN Standards 8077/8088
Supply of 63mm PPR Elbow conforming to DIN Standards 8077/8089
Supply of 75mm PPR Elbow conforming to DIN Standards 8077/8090
Supply of 90mm PPR Elbow conforming to DIN Standards 8077/8091
Supply of 110mm PPR Elbow conforming to DIN Standards 8077/8092
Supply of 20mm PPR Tee conforming to DIN Standards 8077/8084
Supply of 25mm PPR Tee conforming to DIN Standards 8077/8085
Supply of 32mm PPR Tee conforming to DIN Standards 8077/8086
Supply of 40mm PPR Tee conforming to DIN Standards 8077/8087
Supply of 50mm PPR Tee conforming to DIN Standards 8077/8088
Supply of 63mm PPR Tee conforming to DIN Standards 8077/8089
Supply of 75mm PPR Tee conforming to DIN Standards 8077/8090
Supply of 90mm PPR Tee conforming to DIN Standards 8077/8091
Supply of 110mm PPR Tee conforming to DIN Standards 8077/8092
Supply of 20mm PPR End Cap conforming to DIN Standards 8077/8084
Supply of 25mm PPR End Cap conforming to DIN Standards 8077/8085
Supply of 32mm PPR End Cap conforming to DIN Standards 8077/8086
Supply of 40mm PPR End Cap conforming to DIN Standards 8077/8087
Supply of 50mm PPR End Cap conforming to DIN Standards 8077/8088
Supply of 63mm PPR End Cap conforming to DIN Standards 8077/8089
Supply of 75mm PPR End Cap conforming to DIN Standards 8077/8090
Supply of 90mm PPR End Cap conforming to DIN Standards 8077/8091
Supply of 110mm PPR End Cap conforming to DIN Standards 8077/8092
Supply of 25mm x 20mm PPR Reducer conforming to DIN Standards
8077/8092

Supply of 32mm x 25mm PPR Reducer conforming to DIN Standards


8077/8092
Supply of 32mm x 20mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 40mm x 32mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 40mm x 25mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 40mm x 20mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 50mm x 20mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 50mm x 25mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 50mm x 32mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 50mm x 40mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 63mm x 20mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 63mm x 25mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 63mm x 32mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 63mm x 40mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 63mm x 50mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 75mm x 40mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 75mm x 50mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 75mm x 63mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 90mm x 63mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 90mm x 75mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 110mm x 63mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 110mm x 75mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 110mm x 90mm PPR Reducer conforming to DIN Standards
8077/8092
Supply of 25mm x 20mm x 25mm PPR Reducer Tee conforming to DIN Standards 8077/8092
Supply of 32mm x 25mm x 32mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 32mm x 20mm x 32mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 40mm x 20mm x 40mm PPR Reducer Tee conforming to DIN
Standards 8077/8092

Supply of 40mm x 25mm x 40mm PPR Reducer Tee conforming to DIN


Standards 8077/8092
Supply of 40mm x 32mm x 40mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 50mm x 20mm x 50mm PPR Reducer Tee conforming to DIN Standards 8077/8092
Supply of 50mm x 25mm x 50mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 50mm x 32mm x 50mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 50mm x 40mm x 50mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 63mm x 20mm x 63mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 63mm x 25mm x 63mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 63mm x 32mm x 63mm PPR Reducer Tee conforming to DIN Standards 8077/8092
Supply of 63mm x 40mm x 63mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 63mm x 50mm x 63mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 75mm x 50mm x 75mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 75mm x 63mm x 75mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 90mm x 50mm x 90mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 90mm x 63mm x 90mm PPR Reducer Tee conforming to DIN Standards 8077/8092
Supply of 110mm x 75mm x 110mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 110mm x 90mm x 110mm PPR Reducer Tee conforming to DIN
Standards 8077/8092
Supply of 20mm x PPR Female Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 25mm x PPR Female Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 25mm x PPR Female Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 32mm x PPR Female Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 32mm x PPR Female Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 32mm x 1" PPR Female Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 40mm x 1 PPR Female Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 50mm x 1 PPR Female Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 63mm x 2" PPR Female Threaded Adaptor conforming to DIN Standards 8077/8092

Supply of 75mm x 2PPR Female Threaded Adaptor conforming to DIN


Standards 8077/8092
Supply of 20mm x PPR Male Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 25mm x PPR Male Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 25mm x PPR Male Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 32mm x PPR Male Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 32mm x 1" PPR Male Threaded Adaptor conforming to DIN Standards 8077/8092
Supply of 40mm x 1 PPR Male Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 50mm x 1 PPR Male Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 63mm x 2" PPR Male Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 75mm x 2PPR Male Threaded Adaptor conforming to DIN
Standards 8077/8092
Supply of 20mm x PPR Female Threaded Elbow conforming to DIN
Standards 8077/8092
Supply of 25mm x PPR Female Threaded Elbow conforming to DIN
Standards 8077/8092
Supply of 25mm x PPR Female Threaded Elbow conforming to DIN
Standards 8077/8092
Supply of 32mm x PPR Female Threaded Elbow conforming to DIN
Standards 8077/8092
Supply of 32mm x PPR Female Threaded Elbow conforming to DIN
Standards 8077/8092
Supply of 32mm x 1" PPR Female Threaded Elbow conforming to DIN
Standards 8077/8092
Supply of 20mm x PPR Male Threaded Elbow conforming to DIN Standards
8077/8092
Supply of 25mm x PPR Male Threaded Elbow conforming to DIN Standards
8077/8092
Supply of 25mm x PPR Male Threaded Elbow conforming to DIN Standards
8077/8092
Supply of 32mm x PPR Male Threaded Elbow conforming to DIN Standards
8077/8092
Supply of 32mm x1" PPR Male Threaded Elbow conforming to DIN Standards
8077/8092
Supply of 20mm x PPR Female Threaded Tee conforming to DIN Standards
8077/8092
Supply of 25mm x PPR Female Threaded Tee conforming to DIN Standards
8077/8092
Supply of 25mm x PPR Female Threaded Tee conforming to DIN Standards
8077/8092
Supply of 32mm x PPR Female Threaded Tee conforming to DIN Standards
8077/8092
Supply of 32mm x PPR Female Threaded Tee conforming to DIN Standards
8077/8092

Supply of 32mm x 1" PPR Female Threaded Tee conforming to DIN Standards
8077/8092
Supply of 20mm x PPR Male Threaded Teeconforming to DIN Standards
8077/8092
Supply of 25mm x PPR Male Threaded Tee conforming to DIN Standards
8077/8092
Supply of 25mm x PPR Male Threaded Tee conforming to DIN Standards
8077/8092
Supply of 32mm x PPR Male Threaded Tee conforming to DIN Standards
8077/8092
Supply of 32mm x PPR Male Threaded Tee conforming to DIN Standards
8077/8092
Supply of 32mm x 1" PPR Male Threaded Tee conforming to DIN Standards
8077/8092
Supply of 20mm x PPR Female Threaded Union conforming to DIN Standards 8077/8092
Supply of 25mm x PPR Female Threaded Union conforming to DIN Standards 8077/8092
Supply of 32mm x 1 PPR Female Threaded Union conforming to DIN Standards 8077/8092
Supply of 40mm x 1 PPR Female Threaded Union conforming to DIN Standards 8077/8092
Supply of 50mm x 1 PPR Female Threaded Union conforming to DIN Standards 8077/8092
Supply of 63mm x 2 PPR Female Threaded Union conforming to DIN Standards 8077/8092
Supply of 20mm x PPR Male Threaded Union conforming to DIN Standards
8077/8092
Supply of 25mm x PPR Male Threaded Union conforming to DIN Standards 8077/8092
Supply of 32mm x 1 PPR Male Threaded Union conforming to DIN Standards
8077/8092
Supply of 40mm x 1 PPR Male Threaded Union conforming to DIN Standards 8077/8092
Supply of 50mm x 1 PPR Male Threaded Union conforming to DIN Standards 8077/8092
Supply of 63mm x 2 PPR Male Threaded Union conforming to DIN Standards
8077/8092
Supply of 20mm PPR Union conforming to DIN Standards 8077/8092
Supply of 25mm PPR Union conforming to DIN Standards 8077/8092
Supply of 32mm PPR Union conforming to DIN Standards 8077/8092
Supply of 20mm PPR Ball Valve conforming to DIN Standards 8077/8092
Supply of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092
Supply of 32mm PPR Ball Valve conforming to DIN Standards 8077/8092
Supply of 40mm PPR Ball Valve conforming to DIN Standards 8077/8092
Supply of 50mm PPR Ball Valve conforming to DIN Standards 8077/8092
Supply of 63mm PPR Ball Valve conforming to DIN Standards 8077/8092
Supply of 75mm PPR Ball Valve conforming to DIN Standards 8077/8092

Supply of 90mm PPR Ball Valve conforming to DIN Standards 8077/8092


Supply of 20mm PPR Clamp conforming to DIN Standards 8077/8092
Supply of 25mm PPR Clamp conforming to DIN Standards 8077/8092
Supply of 32mm PPR Clamp conforming to DIN Standards 8077/8092
Supply of 40mm PPR Clamp conforming to DIN Standards 8077/8092
Labour charges for laying, joining, welding, fixing and commissioning the PPR pipes including all specials
such as couplers/ bends/ tees etc including fixing necessary fittings like bends, plugs, couplers, junctions,
tees, etc with welding the joint as per standard practice - up to 40 mm dia
Labour charges for laying, joining, welding, fixing and commissioning the PPR pipes including all specials
such as couplers/ bends/ tees etc including fixing necessary fittings like bends, plugs, couplers, junctions,
tees, etc with welding the joint as per standard practice - above 40 mm dia

ms to be used on work are of first quality & ISI and as approved by the Engineer In charge of the work.

n above are:
r finished item of work
charges only

Rates for all the materials are based on market rates plus Sales Tax/ Material VAT.
b) Works Contract VAT for General/ Composition Scheme on finished items may be allowed as applicable.

porcelain items: 50% extra may be allowed on basic cost of white porcelain items excluding fittings

s for Sanitary & water supply items are purely for guidance for the officers for preparation of estimates vide Para 113 of APPWD code. A
res the estimate is however responsible for proper rates as envisaged in Para 45 of APPWD code.

"BMW" for Water Supply & Sanitary items


"A" for Name of the Section
"01" for Serial Number of the Item

ELECTRICAL ITEMS FOR BUILDINGS


DESCRIPTION OF ITEM
3
SECTION - 1
M.S. CONDUIT PIPES
Supply of ISI, 20mm dia, 16 guage thickness MS conduit pipe of makes NAI / Bharath / GB.
Supply of ISI, 25mm dia, 16 guage thickness MS conduit pipe of makes NAI / Bharath / GB.
Supply of ISI, 32mm dia,16 guage thickness MS conduit pipe of makes NAI / Bharath / GB.
Supply of ISI, 38mm dia, 16 guage thickness MS conduit pipe of makes NAI / Bharath / GB.
Supply of ISI, 50mm dia,16 guage thickness MS conduit pipe of makes NAI / Bharath / GB.
Supply of 19 / 20 mm MS Junction box normal range big size long neck.

Supply of 25 mm MS Junction box normal range big size long neck.


Supply of 32 mm MS Junction box normal range big size long neck.
Supply of 40 / 38 mm MS Junction box normal range big size long neck.
Supply of 50 mm MS Junction box normal range big size
long neck.
Supply of 25/20mm.MS Junction deep box.
Supply of 32mm.MS Junction deep box.
Supply of 40mm.MS Junction deep box.
Supply of 19/20mm MS Inspection Bends.
Supply of 25mm MS Inspection Bends.
Supply of 32mm MS Inspection Bends.
Supply of 40/38mm MS Inspection Bends.
Supply of 50mm MS Inspection Bends.
Supply of 19/20mm MS Inspection Tee.
Supply of 25mm MS Inspection Tee.
Supply of 32mm MS Inspection Tee.
Supply of 40/38mm MS Inspection Tee.
Supply of 50mm MS Inspection Tee.
Supply of 19/20mm MS Inspection Elbow.
Supply of 25mm MS Inspection Elbow.
Supply of 32mm MS Inspection Elbow.
Supply of 40/38mm MS Inspection Elbow.
Supply of 50mm MS Inspection Elbow.
Supply of MS Inspection 10 Guage G.I. checknut size 19/20mm.
Supply of MS Inspection 10 Guage G.I. checknut size 25mm.
Supply of MS Inspection 10 Guage G.I. checknut size 32mm.
Supply of MS Inspection 10 Guage G.I.checknut size 40/38mm.
Supply of MS Inspection 10 Guage G.I. checknut size 50mm.
Supply of 19/20mm Saddles with Base.
Supply of 25mm Saddles with Base.
Supply of 32mm Saddles with Base.
Supply of 40/38mm Saddles with Base.
Supply of 50mm Saddles with Base.
Supply of 19/20mm 20 guage Saddles.
Supply of 25mm 20 guage Saddles.
Supply of 32mm 20 guage Saddles.
Supply of 40/38mm 20 guage Saddles.
Supply of 50mm 20 guage Saddles.
Supply of 19/20mm 16 Guage socket coupler.
Supply of 25mm 16 Guage socket coupler.
Supply of 32mm 16 Guage socket coupler.
Supply of 38mm 16 Guage socket coupler.
Supply of 40mm 16 Guage socket coupler.
Supply of 50mm 16 Guage socket coupler.
Supply of 19mm Ball Socket.

Supply of 25mm Ball Socket.


PVC CONDUIT PIPES
Supply of ISI 20mm outer dia medium (1.55mm thickness) grade with IS:9537 part 3 regid PVC pipe of
makes Sudhakar / Maco Plast / Modi.
Supply of ISI 20mm outer dia heavy (2.10mm thickness)
grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi.
Supply of ISI 25mm outer dia medium (1.80mm thickness)
grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi.
Supply of ISI 25mm outer dia heavy (2.20mm thickness)
grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi.
Supply of ISI 32mm outer dia medium (2.10mm thickness)
grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi.
Supply of ISI 40mm outer dia medium (2.30mm thickness)
grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi.
Supply of ISI 50mm outer dia medium (2.85mm thickness)
grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi.
Supply of Non - ISI 19mm 1.50mm thick regid PVC pipe of
makes Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast.
Supply of Non - ISI 19mm 1.80mm thick regid PVC pipe of
makes Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast.
Supply of Non - ISI 25mm 1.50mm thick regid PVC pipe of makes Million Plast / Sudhakar / Durga /
Nandi / Sunlight / Besto Plast.
Supply of Non - ISI 25mm 1.80mm thick regid PVC pipe of
makes Million Plast / Sudhakar / Durga / Nandi / Sunlight / Besto Plast.
Supply of Non - ISI 32mm dia 2.0mm thickness PVC pipe of makes Million Plast / Sudhakar / Durga /
Nandi / Sunlight / Besto Plast.
Supply of Non - ISI 40mm dia 2.0mm thickness PVC pipe of makes Million Plast / Sudhakar / Durga /
Nandi / Sunlight / Besto Plast.
Supply of Non - ISI 50mm dia 2.0mm thickness PVC pipe of makes Million Plast / Sudhakar / Durga /
Nandi / Sunlight / Besto Plast.
Supply of ISI 19/20mm width and 12.5mm height Casing
and Caping of Modi make.
Supply of ISI 25mm width and 12.5mm height Casing and
Caping of Modi make.
Supply of ISI 32mm width and 12.5mm height Casing and
Caping of Modi make.
Supply of ISI 38/40mm width and 12.5mm height Casing
and Caping of Modi make.
Supply of Non - ISI 19/20mm width and 12.5mm height
Casing and Caping of Diamond / Durga make.
Supply of Non - ISI 25mm width and 12.5mm height Casing
and Caping of Diamond / Durga make.
Supply of Non - ISI 32mm width and 12.5mm height Casing
and Caping of Diamond / Durga make.
Supply of Non - ISI 38/40mm width and 12.5mm height
Casing and Caping of Diamond / Durga make.
Supply of 19/20mm PVC Flexible Pipe.
Supply of 25mm PVC Flexible Pipe.
Supply of 32mm PVC Flexible Pipe.
Supply of 40/38mm PVC Flexible Pipe.
Supply of 50mm PVC Flexible Pipe.

Supply of 19/20mm PVC Flexible Couplings.


Supply of 25mm PVC Flexible Couplings.
Supply of 32mm PVC Flexible Couplings.
Supply of 40/38mm PVC Flexible Couplings.
Supply of 50mm PVC Flexible Couplings.
Supply of 19/20mm PVC Junction Boxes Normal.
Supply of 25mm PVC Junction Boxes Normal.
Supply of 32mm PVC Junction Boxes Normal.
Supply of 40mm PVC Junction Boxes Normal.
Supply of 50mm PVC Junction Boxes Normal.
Supply of PVC Junction Boxes Deep size 19/20mm.
Supply of PVC Junction Boxes Deep size 25mm.
Supply of PVC Junction Boxes Deep size 32mm.
Supply of PVC Junction Boxes Deep size 40/38mm.
Supply of PVC Junction Boxes Deep size 50mm.
Supply of 19/20mm dia 1.5mm thick PVC Bends of Sudhakar make.
Supply of 25mm dia 1.5mm thick PVC Bends of Sudhakar
make.
Supply of 32mm dia 2.0mm thick PVC Bends of Sudhakar make.
Supply of 40mm dia 2.0mm thick PVC Bends of Sudhakar
make.
Supply of 50mm dia 2.0mm thick PVC Bends of Sudhakar
make.
Dummy Cover to PVC junction boxes
HOT DIP GALVANIZED METAL BOXES
Supply of 1 or 2 Module box
Supply of 3 Module box
Supply of 4 Module box
Supply of 6 Module box
Supply of 8 or 9 Module box Horizontal/Vertical.
Supply of 12 Module box vertical.
METALLIC BOXES
Supply of 4" x 4" Metal Box
Supply of 4" x 7" Metal Box
Supply of 6" x 6" Metal Box
Supply of 6" x 8" Metal Box
Supply of 10" x 8" Metal Box
Supply of 10" x 12" Metal Box
T.W. BOARDS
Supply of T.W.Board of Size 4" x 4"
Supply of T.W.Board of Size 4" x 7"
Supply of T.W.Board of Size 6" x 6"
Supply of T.W.Board of Size 6" x 8"
Supply of T.W.Board of Size 8" x 10"
Supply of T.W.Board of Size 10" x 12"
Supply of T.W.Board of Size 12" x 15"
SWITCH BOARDS

Supply of Decolam Board of Size 4" x 4"


Supply of Decolam Board of Size 4" x 7"
Supply of Decolam Board of Size 6" x 6"
Supply of Decolam Board of Size 6" x 8"
Supply of Decolam Boardof Size 8" x 10"
Supply of Decolam Board of Size 10" x 12"
Supply of Decolam Board of Size 12" x 15"
Supply of Peeta Board of Size 9" x 14"
Supply of Peeta Board of Size 12" x 10"
Supply of Peeta Board of Size 15" x 20"
Supply of Peeta Board of Size 18" x 24"
Supply of Peeta Board of Size 18" x 30"
Supply of No.8 Screws of 12mm.
Supply of No.8 Screws of 25mm.
Supply of No.8 Screws of 30mm.
Supply of No.8 Screws of 35/38mm.
Supply of No.8 Screws of 50mm.
Supply of No.8 Screws of 63/75mm.

COPPER FLEXIBLE CABLES


(AS PER IS:694)
Supply of 14/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990
specification for Copper cable of makes Finolex / RR kabel / KEI
Supply of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990
specification for Copper cable of makes Finolex / RR kabel / KEI
Supply of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990
specification for Copper cable of makes Finolex / RR kabel / KEI
Supply of 56/0.3mm (4.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990
specification for Copper cable of makes Finolex / RR kabel / KEI
Supply of 84/0.3mm (6.0 Sqmm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990
specification for Copper cable of makes Finolex / RR kabel / KEI
Supply of 140/0.3mm (10.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable of makes Finolex /
RR kabel / KEI
Supply of 126/0.4mm (16.0 Sqmm) PVC FRLS / HFFR insulated flexible Copper cable of makes Finolex /
RR kabel / KEI
Supply of 14/0.3mm (1.0 Sqmm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million / Fortune Art / Paragon / HPL /
L&T / Power Flex / RPG / Anchor / Bonton.
Supply of 22/0.3mm (1.5 Sqmm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million / Fortune Art / Paragon / HPL /
L&T / Power Flex / RPG / Anchor / Bonton.

Supply of 36/0.3mm (2.5 Sqmm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million / Fortune Art / Paragon / HPL /
L&T / Power Flex / RPG / Anchor / Bonton.
Supply of 56/0.3mm (4.0 Sqmm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million / Fortune Art / Paragon / HPL /
L&T / Power Flex / RPG / Anchor / Bonton.
Supply of 84/0.3mm (6.0 Sqmm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for
Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million / Fortune Art / Paragon / HPL /
L&T / Power Flex / RPG / Anchor / Bonton.

Supply of 140/0.3mm (10.0 Sqmm) FRLS PVC insulated flexible Copper cable of makes Ploycab /
Havells / Sun Cab / Gold Medal / Million / Fortune Art / Paragon / HPL / L&T / Power Flex / RPG / Anchor /
Bonton.
Supply of 126/0.4mm (16.0 Sqmm) PVC FRLS insulated flexible Copper cable of makes Ploycab /
Havells / Sun Cab / Gold Medal / Million / Fortune Art / Paragon / HPL / L&T / Power Flex / RPG / Anchor /
Bonton.
Supply of 14/0.3mm (1.0 Sqmm) FR / FRLS PVC insulated
1100V grade as perIS:694/1990 specification for Copper cable of makes Pawancab / Nakoda / Star /
Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard / Standard / Gloster.
Supply of 22/0.3mm (1.5 Sqmm)FR / FRLS PVC insulated
1100V grade as perIS:694/1990 specification for Copper
cable of makes Pawancab / Nakoda / Star / Milltec / Fine
Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard / Standard / Gloster.

Supply of 36/0.3mm (2.5 Sqmm) FR / FRLS PVC insulated


1100V grade as perIS:694/1990 specification for Copper cable of makes Pawancab / Nakoda / Star /
Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard / Standard / Gloster.

Supply of 56/0.3mm (4.0 Sqmm) FR / FRLS PVC insulated


1100V grade as perIS:694/1990 specification for Copper cable of makes Pawancab / Nakoda / Star /
Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard / Standard / Gloster.

Supply of 84/0.3mm (6.0 Sqmm) FR / FRLS PVC insulated


1100V grade as perIS:694/1990 specification for Copper cable of makes Pawancab / Nakoda / Star /
Milltec / Fine Cab / Payal / Sunlight / Bentec / Gemscab / Vimal / V-Guard / Standard / Gloster.

Supply of 140/0.3mm (10.0 Sqmm) FR / FRLS PVC insulated 1100V grade as perIS:694/1990
specification for Copper cable of makes Pawancab / Nakoda / Star / Milltec / Fine Cab / Payal / Sunlight /
Bentec / Gemscab / Vimal / V-Guard / Standard / Gloster.
Supply of 126/0.4mm (16.0 Sqmm) FR / FRLS PVC insulated 1100V grade as perIS:694/1990
specification for Copper cable of makes Pawancab / Nakoda / Star / Milltec / Fine Cab / Payal / Sunlight /
Bentec / Gemscab / Vimal / V-Guard / Standard / Gloster.

SHEATHED FLEXIBLE CABLES

Supply of PVC insulated 2 core 1.5 Sqmm sheathed flexible


copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable / KEI.
Supply of PVC insulated 2 core 2.5 Sqmm sheathed flexible copper cable for voltage up to 1100V as per
IS 694/1991 of makes Finolex / RR Kable / KEI.
Supply of PVC insulated 2 core 4.0 Sqmm sheathed flexible
copper cable for voltage up to 1100V as per IS 694/1992 of makes Finolex / RR Kable / KEI.
Supply of PVC insulated 3 core 1.5 Sqmm sheathed flexible
copper cable for voltage up to 1100V as per IS 694/1990 of
makes Finolex / RR Kable / KEI.
Supply of PVC insulated 3 core 2.5 Sqmm sheathed flexible
copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable / KEI.
Supply of PVC insulated 3 core 4.0 Sqmm sheathed flexible
copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable / KEI.
Supply of PVC insulated 4 core 1.5 Sqmm sheathed flexible
copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable / KEI.
Supply of PVC insulated 4 core 2.5 Sqmm sheathed flexible
copper cable for voltage up to 1100V as per IS 694/1991 of makes Finolex / RR Kable / KEI.
Supply of PVC insulated 4 core 4.0 Sqmm sheathed flexible
copper cable for voltage up to 1100V as per IS 694/1992 of makes Finolex / RR Kable / KEI.

SERVICE MAINS AND FLAT CABLE OF ISI FOR SUBMERSIBLE MOTORS.


Supply of 2.5 Sqmm WPSC (Weather Proof Single Core) ISI Alluminium Wire Polycab / V-Guard /
Million / Payal / Vimal.
Supply of 6 Sqmm WPSC (Weather Proof Single Core) ISI
Alluminium Wire of makes Polycab / V-Guard / Million /
Payal / Nakoda / Vimal.
Supply of 10 Sqmm WPSC (Weather Proof Single Core) ISI
Alluminium Wire of makes Polycab / Gold Medal / Million / Payal / Nakoda.
Supply of 16 Sqmm WPSC (Weather Proof Single Core) ISI
Alluminium Wire of makes Polycab / Gold Medal / Million / Payal / Nakoda.
Supply of 6 Sqmm WPTC (Weather Proof Twin Core) ISI
Alluminium Wire of makes Polycab / V-Guard / Million / Payal / Nakoda / Vimal.
Supply of 10 Sqmm WPTC (Weather Proof Twin Core) ISI
Alluminium Wire of makes Polycab / Gold Medal / Million / Payal / Nakoda.
Supply of 16 Sqmm WPTC (Weather Proof Twin Core) ISI
Alluminium Wire of makes Polycab / Gold Medal / Million / Payal / Nakoda.
Supply of 23 / 0060 twin core twisted / flat heavy Copper wire of makes Polycab / Gold Medal / Million /
Payal /Nakoda.
Supply of 3 Core 1.5 Sqmm Flat Copper cable of ISI for
Submersible Motors of makes Polycab / Gold Medal / Million / Payal / Nakoda.
Supply of 3 Core 2.5 Sqmm Flat Copper cable as per IS
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.
Supply of 3 Core 4.0 Sqmm Flat Copper cable as per IS
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.
Supply of 3 Core 6.0 Sqmm Flat Copper cable as per IS
694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.

Supply of 3 Core 10.0 Sqmm Flat Copper cable as per IS


694:1990 for Submersible Motors of makes Polycab / Gold
Medal / Million / Payal / Havells / Nakoda.
FLUSH TYPE SWITCHES AND ACCESSORIES
Supply of 6A 1 Way flush type Swich of makes Gold Medal
Olive / Million Zoom / Anchor Penta Cherry.
Supply of 6A 2 Way flush type Swich of makes Gold Medal
Olive / Million Zoom / Anchor Penta Cherry.
Supply of 6A 2 pin flush type Socket of makes Gold Medal
Olive / Million Zoom / Anchor Penta Cherry.
Supply of 6A 3/2 pin flush type Socket with shutter of makes Gold Medal Olive/ Million Zoom /Anchor
Penta Cherry.
Supply of 6A flush type Neon Indicator of makes Gold
Medal Olive / Million Zoom / Anchor Penta Cherry.
Supply of 6A Triangle Plug Top of makes Gold Medal Olive /
Million Zoom / Anchor Penta Cherry.
Supply of 6A 1 Way flush type Bed Swich /Bell Push of makes Gold Medal Olive/Million Zoom/Anchor
Penta Cherry.
Supply of 16A flush type Swich of makes Gold Medal Olive /Million Zoom / Anchor Penta Cherry.
Supply of 16A flush type Socket with shutter of makes Gold
Medal Olive / Million Zoom / Anchor Penta Cherry.
Supply of 16A flush type Switch Socket combined (2 in one) of makes Gold Medal Olive / Million Zoom /
Anchor Penta Cherry.
Supply of 16A Triangle Plug Top of makes Gold Medal Olive
/ Million Zoom / Anchor Penta Cherry.
Supply of stepped type Electronic Regulator of makes Gold
Medal Olive / Million Zoom / Anchor Penta Cherry.
Supply of 3 Plate Jumbo Ceiling Rose of makes Anchor /
Gold Medal Olive / Million Zoom.
Supply of BH / SBH of makes Anchor / Gold Medal Olive /
Million Zoom.
Supply of Pendent Holder / Adopter of makesAnchor / Gold
Medal Olive / Million Zoom.
Supply of Telephone Jack with Connector of makes Gold
Medal Olive / Million Zoom / Anchor Penta Cherry.
Supply of TV Antenna Outlet of makes Gold Medal Olive / Million Zoom / Anchor Penta Cherry.
Supply of 15A/10A Flush type Fuse of makes Gold Medal /
Million / Vimal / Maru Mantero / Anchor Penta Cherry.
Supply of 32A DP Flush type of makes Gold Medal / Million
/ Anchor Penta Cherry.
Supply of Calling Bell of makes Anchor / Gold Medal /
Million / Vimal / Maru.
Supply of Buzzer of makes Anchor / Gold Medal / Million /
Vimal / Maru.
Supply of Ding Dong Bell of makes Anchor / Gold Medal /
Million / Vimal / Maru.

Supply of Electronic Musical Bell of makes Anchor / Gold


Medal / Million / Vimal / Maru.
Supply of Remote Bell of makes Anchor / Gold Medal /
Million / Vimal / Maru.
Supply of MC Holder of makes Anchor / Gold Medal /
Million / Vimal / Maru.
Supply of Spike Guard with 1 No Switch and 4 Nos Sockets
of makes Anchor / Gold Medal / Million / Vimal / Maru.
Supply of Spike Guard with 4 No Switches and 4 Nos
Sockets of makes Anchor / Gold Medal / Million / Vimal /
Supply
Maru. of 6A 1 Way flush type Swich of makes Milltec /
Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 6A 2 Way flush type Swich of makes Milltec / Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 6A 2 pin flush type Socket of makes Milltec /
Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 6A 3/2 pin flush type Socket with shutter of
makes Milltec / Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 6A flush type Neon Indicator of makes Milltec /
Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 6A Triangle Plug Top of makes Milltec / Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 6A 1 Way flush type Bed Swich / Bell Push of makes Milltec / Vimal opel / Maru Mantero /
Starex Smile / CPL.
Supply of 16A flush type Swich of makes Milltec / Vimal
opel / Maru Mantero / Starex Smile / CPL.
Supply of 16A flush type Socket with shutter of makes
Milltec / Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 16A flush type Switch Socket combined (2 in one) of makes Milltec / Vimal opel / Maru
Mantero / Starex Smile / CPL.
Supply of 16A Triangle Plug Top of makes Milltec / Vimal
opel / Maru Mantero / Starex Smile / CPL.
Supply of stepped type Electronic Regulator of makes
Milltec / Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 3 Plate Jumbo Ceiling Rose of makes Milltec /
Vimal opel / Maru Mantero / Starex Smile / CPL.
Supply of 32A DP Flush type of makes Milltec / Vimal / Maru / Star.
MINI MODULAR SWITCHES AND ACCESSORIES
Supply of 6A 1 Way Mini Modular Switch with Cover Frame
of makes GM / Anchor Excel / Gold Medal / Million / Vimal
/ Maru / Milltec / CPL.
Supply of 6A 2 Way Mini Modular Switch with Cover Frame
of makes GM / Anchor Excel / Gold Medal / Million / Vimal
/ Maru / Milltec / CPL.
Supply of 6A 2 Pin Mini Modular Socket with Cover Frame
of makes GM / Anchor Excel / Gold Medal / Million / Vimal
/ Maru / Milltec / CPL.
Supply of 6A 3/2 Pin Mini Modular Socket with Cover
Frame of makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.

Supply of 6A Mini Modular Neon Indicator with Cover


Frame of makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.

Supply of 6A Mini Modular Bed Switch / Bell Push with


Cover Frame of makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.

Supply of 6A 1 Way Mini Modular Switch with Neon


Indicator with Cover Frame of makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec /
CPL.
Supply of 6A Mini Modular Bell Push with Neon Indicator
with Cover Frame of makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.

Supply of 16A Mini Modular Switch with Cover Frame of


makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.

Supply of 16A (2 in one) Mini Modular Switch & Socket


combined with Cover Frame of makes GM / Anchor Excel /
Gold Medal / Million / Vimal / Maru / Milltec / CPL.
Supply of 16A Triangle Top with Cover Frame of makes GM
/ Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.
Supply of Mini Modular Stepped type Electronic Regulator with Cover Frame of makes GM / Anchor
Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.

Supply of Mini Modular Telephone Jack with Connector


with Cover Frame of makes GM / Anchor Excel / Gold
Medal / Million / Vimal / Maru / Milltec / CPL.
Supply of Mini Modular TV Antenna Outlet with Cover
Frame of makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.

Supply of 16A/10A Mini Modular Flush Fuse with Cover


Frame of makes GM / Anchor Excel / Gold Medal / Million / Vimal / Maru / Milltec / CPL.

MODULAR SWITCHES AND ACCESSORIES


Supply of 6A / 10A 1 Way Modular Switch of Legrand
Arteor / MK Blenge / Schneider Zen celo
Supply of 6A / 10A 2 Way Modular Switch of Legrand
Arteor / MK Blenge / Schneider Zen celo
Supply of 6A / 10A 2 Pin Modular Socket of Legrand Arteor
/ MK Blenge / Schneider Zen celo
Supply of 6A / 10A 3/2 Pin Modular Socket with shutter of
Legrand Arteor / MK Blenge / Schneider Zen celo
Supply of 6A / 10A Modular Switch with Neon Indicator of
Legrand Arteor / MK Blenge / Schneider Zen celo

Supply of 6A / 10A Modular Bell Push with Neon Indicator


of Legrand Arteor / MK Blenge / Schneider Zen celo
Supply of 16A / 10A Modular Flush Fuse with Neon
Indicator of Legrand Arteor / MK Blenge / Schneider Zen celo
Supply of 16A / 20A 1 Way Modular Switch of Legrand
Arteor / MK Blenge / Schneider Zen celo
Supply of 16A / 20A 2 Way Modular Switch of Legrand
Arteor / MK Blenge / Schneider Zen celo
Supply of 20A 1 Way Modular Switch with Indicator of
Legrand Arteor / MK Blenge / Schneider Zen celo
Supply of 20A Modular Socket with shutter of Legrand
Arteor / MK Blenge / Schneider Zen celo
Supply of 16A/6A 1 way Combi Socket Modular Socket with
shutter of Legrand Arteor / MK Blenge / Schneider Zen celo
Supply of 16A Triangle Top of Legrand Arteor / MK Blenge / Schneider Zen celo

Supply of 1Module Modular type Electronic step type fan regulator of GM Four-Five/Legrand
Arteor/Schneider Zencelo/MK Blenge
Supply of Modular Telephone jack with Connector of
Legrand Arteor / MK Blenge / Schneider Zen celo
Supply of Modular TV Antenna outlet of Legrand Arteor /
MK Blenge / Schneider Zen celo
Supply of 6A / 10A 1 Way Modular Switch of Cabtree
Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 6A / 10A 2 Way Modular Switch of Cabtree


Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 6A / 10A 2 Pin Modular Socket with shutter of Cabtree Thames Platinum / GM / Million /
Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 6A / 10A 3/2 Pin Modular Socket with shutter of


Cabtree Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 6A / 10A Modular Switch with Neon Indicator of


Cabtree Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 6A / 10A Modular Bell Push with Neon Indicator


of Cabtree Thames Platinum / GM / Million / Anchor Roma
viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 16A / 10A Modular Flush Fuse with Neon


Indicator of Cabtree Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune
Art / CPL.
Supply of 16A / 20A 1 Way Modular Switch of Cabtree
Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 16A / 20A 2 Way Modular Switch of Cabtree


Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.
Supply of 20A 1 Way Modular Switch with Indicator of Cabtree Thames Platinum / GM / Million /
Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 20A 2 Modular Socket with shutter of Cabtree


Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 16A/6A 1 way 2 Modular Combi Socket Modular Socket with


shutter of Cabtree Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art
/ CPL.
Supply of 16A Triangle Top of Cabtree Thames Platinum / GM / Million / Anchor Roma viola / Toyoma /
L&T / Fortune Art / CPL.
Supply of Electronic Regulator of Modular of
Roma viola / Toyoma / L&T / Fortune Art / CPL.

Cabtree Thames Platinum / GM / Million / Anchor

Supply of Modular Telephone jack with Connector of


Cabtree Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of Modular Co-Axial Socket type TV Antenna outlet of Cabtree Thames


Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.
Supply of 1 or 2 Modular Cover Frame of Legrand Arteor /
MK Blenge / Schneider Zen celo
Supply of 3 Modular Cover Frame of Legrand Arteor / MK
Blenge / Schneider Zen celo
Supply of 4 Modular Cover Frame of Legrand Arteor / MK
Blenge / Schneider Zen celo
Supply of 6 Modular Cover Frame of Legrand Arteor / MK Blenge / Schneider Zen celo

Supply of 8 Modular Horizontal / Vertical Cover Frame of


Legrand Arteor / MK Blenge / Schneider Zen celo
Supply of 12 Modular Vertical Cover Frame of Legrand
Arteor / MK Blenge / Schneider Zen celo
Supply of 1 or 2 Modular Cover Frame of Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.

Supply of 3 Modular Cover Frame of Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.
Supply of 4 Modular Cover Frame of Cabtree Thames
Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 6 Modular Cover Frame of Cabtree Thames Platinum / GM / Million / Anchor Roma viola /
Toyoma / L&T / Fortune Art / CPL.
Supply of 8 Modular Horizontal / Vertical Cover Frame of Cabtree Thames Platinum / GM / Million / Anchor
Roma viola / Toyoma / L&T / Fortune Art / CPL.

Supply of 12 Modular Vertical Cover Frame of Cabtree


Thames Platinum / GM / Million / Anchor Roma viola / Toyoma / L&T / Fortune Art / CPL.

SECTION - 2
PANEL MOUNTING SWITCH DISCONNECTOR FUSE UNITS ( SDFU ) AS PER IS: 13947
Supply of 32A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes L&T/ G E / C&S / ABB /
SIEMENS
Supply of 63A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes L&T / G E / C&S / ABB / SIEMENS
Supply of 125A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes L&T / G E / C&S / ABB / SIEMENS
Supply of 200A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes L&T/ G E / C&S / ABB /
SIEMENS
Supply of 250A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes L&T / G E / C&S / ABB / SIEMENS
Supply of 400A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes L&T / G E / C&S / ABB / SIEMENS
Supply of 630A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes L&T / G E / C&S / ABB /
SIEMENS
Supply of 32A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes Standard / Crystal / Havells / HPL.
Supply of 63A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes Standard / Crystal / Havells / HPL.
Supply of 125A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes Standard / Crystal / Havells / HPL.
Supply of 200A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes Standard / Crystal / Havells / HPL.

Supply of 250A TPN Switch Disconnector Fuse Unit Cubical


type without fuses of makes Standard / Crystal / Havells / HPL.
Supply of 400A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes Standard / Crystal / Havells /
Supply of 630A TPN Switch Disconnector Fuse Unit Cubical
type without fuses of makes Standard / Crystal / Havells / HPL.
ON LOAD CHANGEOVER SWITCHES
(OPEN EXECUTION)
AS PER IS:13947
Supply of 63A 4 Pole Change Over Switch on Load with
open Execution of makes HPL Socomec / L & T
Supply of 125A 4 Pole Change Over Switch on Load with
open Execution of makes HPL Socomec / L & T
Supply of 200A 4 Pole Change Over Switch on Load with
open Execution of makes HPL Socomec / L & T
Supply of 250A 4 Pole Change Over Switch on Load with
open Execution of makes HPL Socomec / L & T
Supply of 400A 4 Pole Change Over Switch on Load with open Execution of makes HPL Socomec / L & T
Supply of 630A 4 Pole Change Over Switch on Load with
open Execution of makes HPL Socomec / L & T
Supply of 63A 4 Pole Change Over Switch on Load with open Execution of makes ABB / GE /
SIEMENS / Standard / Crystal / Havells.
Supply of 125A 4 Pole Change Over Switch on Load with
open Execution of makes ABB / GE / SIEMENS / Standard / Crystal / Havells.
Supply of 200A 4 Pole Change Over Switch on Load with
open Execution of makes ABB / GE / SIEMENS / Standard / Crystal / Havells.
Supply of 250A 4 Pole Change Over Switch on Load with open Execution of makes ABB / GE /
SIEMENS / Standard / Crystal / Havells.
Supply of 400A 4 Pole Change Over Switch on Load with
open Execution of makes ABB / GE / SIEMENS / Standard / Crystal / Havells.
Supply of 630A 4 Pole Change Over Switch on Load with
open Execution of makes ABB / GE / SIEMENS / Standard / Crystal / Havells.
Supply of 32A 4 Pole Change Over Switch
SIEMENS / Standard / Crystal / Havells.

on Load

with open Execution of makes ABB / GE /

CHANGE OVER SWITCHES IN SS ENCLOUSURE AS PER IS:13947


Supply of 32A 240V DP Off load Changeover Switch in sheet steel enclosure of makes HPL / Havells /
Standard / Crystal.
Supply of 63A 415V FP Off load Changeover Switch in sheet
steel enclosure of makes HPL / Havells / Standard. / Crystal.
Supply of 100A 415V FP Off load Changeover Switch in
sheet steel enclosure of makes HPL / Havells / Standard /
Crystal.
Supply of 32A 240V DP Off load Changeover Switch in sheet
steel enclosure of makes Million / Sputnik / Sunlight / Bentec / Gold Medal / Star.
Supply of 63A 415V FP Off load Changeover Switch in sheet
steel enclosure of makes Million / Sputnik / Sunlight / Bentec / Gold Medal / Star.
Supply of 100A 415V FP Off load Changeover Switch in
sheet steel enclosure of makes Million / Sputnik / Sunlight /
Bentec / Gold Medal.
REWIRABLE / DOUBLE BREAK SWITCHES IN SS ENCLOSURE
AS PER IS:13947

Supply of 32A 240V SPN Rewirable Fuse Switch in SS


enclosure of makes HPL / Havells / Standard
Supply of 32A 415V TPN Rewirable Fuse Switch in SS
enclosure of makes HPL / Havells / Standard
Supply of 63A 415V TPN Rewirable Fuse Switch in SS
enclosure of makes HPL / Havells / Standard
Supply of 100A 415V TPN Rewirable Fuse Switch in SS
enclosure of makes HPL / Havells / Standard
Supply of 100A 415V TPN Double Break Switch in SS
enclosure without fuses of makes HPL / Havells / Standard
Supply of 200A 415V TPN Double Break Switch in SS
enclosure without fuses of makes HPL / Havells / Standard
Supply of 32A 240V SPN Rewirable Fuse Switch in SS
enclosure of makes Crystal / Gold Medal / Million / Sputnik
/ Sunlight / Bentec / Star.
Supply of 32A 415V TPN Rewirable Fuse Switch in SS
enclosure of makes Crystal / Gold Medal / Million / Sputnik
/ Sunlight / Bentec / Star.
Supply of 63A 415V TPN Rewirable Fuse Switch in SS
enclosure of makes Crystal / Gold Medal / Million / Sputnik
/ Sunlight / Bentec / Star.
Supply of 100A 415V TPN Rewirable Fuse Switch in SS
enclosure of makes Crystal / Gold Medal / Million / Sputnik
/ Sunlight / Bentec / Star.
Supply of 100A 415V TPN Double Break Switch in SS
enclosure without fuse of makes Crystal / Gold Medal / Million / Sputnik / Sunlight / Bentec.
Supply of 200A 415V TPN Double Break Switch in SS
enclosure without fuse of makes Crystal / Gold Medal / Million / Sputnik / Sunlight / Bentec.
HRC FUSE LINKS (BOLTED TYPE)
Supply of up to 32A HRC Fuse Links of makes L & T / G E / C & S / Standard / HPL / Havells.
Supply of 32A to 63A HRC Fuse Links of makes L & T / G E /
C & S / Standard / HPL / Havells.
Supply of 125A to 200A HRC Fuse Links of makes L & T / G E/ C & S / Standard / HPL / Havells.
Supply of 250A to 350A HRC Fuse Links of makes L & T / G E/ C & S / Standard / HPL / Havells.
Supply of 400A HRC Fuse Links of makes L & T / G E / C & S/ Standard / HPL / Havells.
Supply of 630A HRC Fuse Links of makes L & T / G E / C & S / Standard / HPL / Havells.
PORCELAIN REWIRABLE FUSE UNITS.
Supply of 32A 240V Porcelain Rewirable Fuse Units of makes Gold Medal / Million /HPL / Sputnik / Vimal
/ Standard /Star / Sunlight / Crystal / Bentec
Supply of 32A 415V Porcelain Rewirable Fuse Units of
makes Gold Medal / Million /HPL / Sputnik / Vimal / Standard / Star / Sunlight / Crystal / Bentec
Supply of 63A
415V Porcelain Rewirable Fuse Units of makes Gold Medal
Sputnik / Vimal / Standard / Star / Sunlight / Crystal / Bentec

/ Million /HPL /

Supply of 100A 415V Porcelain Rewirable Fuse Units of


makes Gold Medal / Million /HPL / Sputnik / Vimal / Standard / Star / Sunlight / Crystal / Bentec

Supply of 200A 415V Porcelain Rewirable Fuse Units with extension strip of makes Gold Medal /
Million /HPL / Sputnik / Vimal / Standard / Star / Sunlight / Crystal / Bentec
Supply of 300A 415V Porcelain Rewirable Fuse Units with extension strip of makes Gold Medal /
Million /HPL / Sputnik / Vimal / Standard / Star/ Sunlight / Crystal /Bentec
VOLTAGE SURGE PROTECTORS
Supply of 2 Pole 2 Module 40 KA 1.4 KV Voltage Surge
Protector of make Legrand / L & T Hager / G E.
Supply of 4 Pole 4 Module 40 KA 1.4 KV Voltage Surge
Protector of make Legrand / L & T Hager / G E.
Supply of 2 Pole 2 Module 15 KA 1.2 KV Voltage Surge
Protector of make Legrand / L & T Hager / G E.
Supply of 4 Pole 4 Module 15 KA 1.2 KV Voltage Surge
Protector of make Legrand / L & T Hager / G E.
PANEL MOUNTING MCCBs/ ACBs
Supply of 63A / 60A 3 Pole MCCB, Adjustable, Confirms to IS / IEC 60947-2 having Breaking Capacity
25 KA with thermal magnetic release Panel Mounted of makes L&T / Schneider / Siemens.
Supply of 125A 3 Pole MCCB, Adjustable, Confirms to IS/IEC
60947-2 having Breaking Capacity 25 KA Panel Mounted of makes L&T / Schneider / Siemens.

Supply of 250A 3 Pole MCCB, Adjustable, Confirms to IS/IEC


60947-2 having Breaking Capacity 36/35 KA Panel Mounted of makes L&T / Schneider / Siemens.

Supply of 400A 3 Pole MCCB, Adjustable, Confirms to IS/IEC


60947-2 having Breaking Capacity 36/35 KA Panel Mounted of makes L&T / Schneider / Siemens.

Supply of 63A / 60A 4 Pole MCCB, Adjustable, Confirms to


IS/IEC 60947-2 having Breaking Capacity 25 KA Panel
Mounted of makes L&T / Schneider / Siemens.
Supply of 125A 4 Pole MCCB, Adjustable, Confirms to IS/IEC
60947-2 having Breaking Capacity 25 KA Panel Mounted of makes L&T / Schneider / Siemens.

Supply of 250A 4 Pole MCCB, Adjustable, Confirms to IS/IEC


60947-2 having Breaking Capacity 35 KA Panel Mounted of makes L&T (DN2-250N) / Schneider /
Siemens.
Supply of 400A 4 Pole MCCB, Adjustable, Confirms to IS/IEC
60947-2 having Breaking Capacity 50 KA Panel Mounted of makes L&T / Schneider / Siemens.

Supply of 63A /60A 3 Pole MCCB /Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA Panel
Mounted of makes Legrand /GE / ABB / Havells / HPL / Standard / Crystal / Indo Asian.

Supply of 125A 3 Pole MCCB / Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA Panel
Mounted of makes Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo Asian.

Supply of 250A 3 Pole MCCB / Confirms to IS/IEC 60947-2 having Breaking Capacity 36/35 KA Panel
Mounted of makes Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo Asian.

Supply of 63A / 60A 4 Pole MCCB / Confirms to IS/IEC


60947-2 having Breaking Capacity 25 KA Panel Mounted of makes Legrand / GE / ABB / Havells / HPL /
Standard / Crystal / Indo Asian.
Supply of 125A 4 Pole MCCB / Confirms to IS/IEC 60947-2
having Breaking Capacity 25 KA Panel Mounted of makes Legrand / GE / ABB / Havells / HPL / Standard /
Crystal / Indo Asian.
Supply of 250A 4 Pole MCCB / Confirms to IS/IEC 60947-2 having Breaking Capacity 50 KA Panel
Mounted of makes Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo Asian.

Supply of 400A 4 Pole MCCB / Confirms to IS/IEC 60947-2 having Breaking Capacity 50 KA Panel
Mounted of makes Legrand / GE / ABB / Havells / HPL / Standard / Crystal / Indo Asian.

PANEL MOUNTING ACBs (Microprocessor Based)


Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically fixed Confirms to IS 13947-2, IEC 60947-2
and BS-EN 60947 with Micro processer based having over load, shot circuit and earth fault Protection of
Siemens / L&T make.
Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically fixed Confirms to IS 13947-2, IEC 60947-2
and BS-EN 60947 with Micro processer based having over load, shot circuit and earth fault Protection of
Siemens / L&T make.
Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically drawout Confirms to IS 13947-2, IEC 60947-2
and BS-EN 60947 with Micro processer based having over load, shot circuit and earth fault Protection of
Siemens / L&T make.
Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically drawout Confirms to IS 13947-2, IEC 60947-2
and BS-EN 60947 with Micro processer based having over load, shot circuit and earth fault Protection of
Siemens / L&T make.
Supply of 800A 3 Pole, 50kA Air Circuit Breaker electrically
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault protection of makes Siemens / L&T / Schneider make.
Supply of 800A 4 Pole, 50kA Air Circuit Breaker electrically
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot circuit and earth fault protection of makes
Siemens / L&T / Schneider make.
Supply of 1000A 3 Pole, 50kA Air Circuit Breaker electrically
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot circuit and earth fault protection of makes
Siemens / L&T / Schneider / ABB make.
Supply of 1000A 4 Pole, 50kA Air Circuit Breaker electrically
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot circuit and earth fault protection of makes
Siemens / L&T / Schneider / ABB make.

Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically


fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN 60947 with Micro processer based having over
load, shot circuit and earth fault Protection of ABB / Legrand / HPL / Indo
Asian make.

Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically


fixed Confirms to IS 13947-2, IEC 60947-2 and BS-EN 60947 with Micro processer based having over
load, shot circuit and earth fault Protection of ABB / Legrand / HPL / Indo Asian make.

Supply of 630A 3 Pole, 50kA Air Circuit Breaker electrically


drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot
circuit and earth fault Protection of ABB / Legrand / HPL / Indo Asian make.
Supply of 630A 4 Pole, 50kA Air Circuit Breaker electrically
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot circuit and earth fault Protection of ABB /
Legrand / HPL / Indo Asian make.
Supply of 800A 3 Pole, 50kA Air Circuit Breaker electrically
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot circuit and earth fault protection of makes ABB /
GE / Legrand / HPL make.
Supply of 800A 4 Pole, 50kA Air Circuit Breaker electrically
drawout Confirms to IS 13947-2, IEC 60947-2 and BS-EN
60947 with Micro processer based having over load, shot circuit and earth fault protection of makes ABB /
GE / Legrand / HPL make.
Supply, instalation, testing and commisioning of 800 Amp, 50KA breaking capacity (100% Neutral
busbar) air insulated compact Raising mains system made of CRCA sheet steel encloser of
thickness not less than 1.5 mm having degree of protection of IP 55 as per 2127. wall strapes, fully
PVC insulated four strip ALUMINIUM busbar in convinent sections including , end feed unit, end
cover units suitable for 415 volts 3 phase, 4 wire, 50 Hz A.C. System,etc., Makes:- Legrand / L&T /
Seimens / Schiender / GE make)

Supply and Fixing of Spring suspension hanger for rising Main for 400A / 800A Raising Mains.
Legrand / L&T / Seimens / Schiender / GE make)

Makes:-

Supply and Fixing of Suspension brackets for rising main for 400A / 800A Raising Mains Makes:- Legrand
/ L&T / Seimens / Schiender / GE make)
Supply and Fixing of 800 Amps Horizontal / Vertical bends Makes:- Legrand / L&T / Seimens / Schiender /
GE make)
Supply and Fixing of Adopter box for 400A / 800A Raising Mains Makes:- Legrand / L&T / Seimens /
Schiender / GE make)
Supply and Fixing of 800 Amps Copper Flexibles for three phases and neutral Makes:- Legrand / L&T /
Seimens / Schiender / GE make)

Supply, instalation, testing and commisioning of 400 Amp, 50KA breaking capacity (100% Neutral
busbar) air insulated compact Raising mains system made of CRCA sheet steel encloser of thickness
not less than 1.5 mm having degree of protection of IP 55 as per 2127. wall strapes, fully PVC insulated
four strip ALUMINIUM busbar in convinent sections including required end feed unit, end cover units
suitable for 415 volts 3 phase, 4 wire, 50 Hz A.C. System, etc., Makes:- Legrand / L&T / Seimens
/Schiender / GE make)

Supply and Fixing of 400 Amps Horizontal / Vertical bends Makes:- Legrand / L&T / Seimens / Schiender /
GE make)
Supply and Fixing of 400 Amps Copper Flexibles for three phases and neutral Makes:- Legrand / L&T /
Seimens / Schiender / GE make)
Supply and Fixing of 400 Amps Tap off box Makes:- Legrand / L&T / Seimens / Schiender / GE make)
Supply and Fixing of 250 Amps Tap off box Makes:- Legrand / L&T / Seimens / Schiender / GE make)
Supply and Fixing of 250 Amps TPN 36KA DPX250-ER MCCB for tap off boxes for power supply Makes:Legrand / L&T / Seimens / Schiender / GE make)
MCBs (AS PER IS:8828)
Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make Legrand / Schneider.

Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark of make Legrand / Schneider.

Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make Legrand / Schneider.

Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark of make Legrand / Schneider.

Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make


Legrand / Schneider.
Supply of 40-63A FP MCB, C/D Curve ISI Mark of make
Legrand / Schneider.
Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make
L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make


L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make L&T Exora / Siemens / GE / ABB /
Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark of make


L&T Exora / Hager / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make


L&T Exora / Hager / Siemens / GE / ABB / Standard / Havells
/ HPL / Indo Asian / Toyoma.
Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark of make
L&T Exora / Hager / Siemens / GE / ABB / Standard / Havells
/ HPL / Indo Asian / Toyoma.
Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make
L&T Exora / Hager / Siemens / GE / ABB / Standard / Havells
/ HPL / Indo Asian / Toyoma.
Supply of 40 - 63A 10KA FP MCB, C/D Curve ISI Mark of
make L&T Exora / Hager / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 6-32A 10KA SP MCB, C/D Curve ISI Mark of make


Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of 40-63A 10KA SP MCB, C/D Curve ISI Mark of make
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of 6-32A 10KA DP MCB, C/D Curve ISI Mark of make
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark C-Curve of make Gold Medal / Milltec / Sputnik /
Crystal / Bentec.
Supply of 6-32A 10KA TP MCB, C/D Curve ISI Mark of make
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of 40 - 63A 10KA TP MCB, C/D Curve ISI Mark of
make Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of 6-32A 10KA FP MCB, C/D Curve ISI Mark of make
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of 40 - 63A 10KA FP MCB, C/D Curve ISI Mark of
make Gold Medal / Milltec / Sputnik / Crystal / Bentec.
ISOLATORS
Supply of 32A DP Isolator of make Legrand / Schneider.
Supply of 40A DP Isolator of make Legrand / Schneider.
Supply of 63A DP Isolator of make Legrand / Schneider.
Supply of 40A TP Isolator of make Legrand / Schneider.
Supply of 63A TP Isolator of make Legrand / Schneider.
Supply of 40A FP Isolator of make Legrand / Schneider.

Supply of 63A FP Isolator of make Legrand / Schneider.


Supply of 100A FP Isolator of make Legrand / Schneider.

Supply of 32A DP Isolator of make L&T Exora / Siemens / GE


/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 40A DP Isolator of make L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 63A DP Isolator of make L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo
Asian / Toyoma.

Supply of 40A TP Isolator of make L&T Exora / Siemens / GE


/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 63A TP Isolator of make L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 40A FP Isolator of make L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 63A FP Isolator of make L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 100A FP Isolator of make L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo
Asian / Toyoma.
Supply of 32A DP Isolator of make Gold Medal / Milltec /
Sputnik / Crystal / Bentec.
Supply of 40A DP Isolator of make Gold Medal / Milltec /
Sputnik / Crystal / Bentec.
Supply of 63A DP Isolator of make Gold Medal / Milltec /
Sputnik / Crystal / Bentec.
Supply of 40A TP Isolator of make Gold Medal / Milltec /
Sputnik / Crystal / Bentec.
Supply of 63A TP Isolator of make Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 40A FP Isolator of make Gold Medal / Milltec /


Sputnik / Crystal / Bentec.

RCCBs CONFIRMS TO
IEC:61008 AND IS:12640
Supply of 40A 2 Pole RCCB 30mA, of makes Legrand / Schneider.
Supply of 63A 2 Pole RCCB 30mA, of makes Legrand / Schneider.
Supply of 40A 2 Pole RCCB 100mA, of makes Legrand /
Schneider.

Supply of 63A 2 Pole RCCB 100mA, of makes Legrand /


Schneider.
Supply of 40A 4 Pole RCCB 30mA, of makes Legrand / Schneider.
Supply of 63A 4 Pole RCCB 30mA, of makes Legrand /
Schneider.
Supply of 40A 4 Pole RCCB 100mA, of makes Legrand /
Schneider.
Supply of 63A 4 Pole RCCB 100mA, of makes Legrand / Schneider.
Supply of 40A 2 Pole RCCB 30mA, of makes L&T Exora / Siemens / GE / ABB / Standard / Havells /
HPL / Indo Asian / Toyoma.
Supply of 63A 2 Pole RCCB 30mA, of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 40A 2 Pole RCCB 100mA, of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 63A 2 Pole RCCB 100mA, of makes L&T Exora / Siemens / GE / ABB / Standard / Havells /
HPL / Indo Asian / Toyoma.
Supply of 40A 4 Pole RCCB 30mA, of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 40A 4 Pole RCCB 30mA, of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 40A 4 Pole RCCB 100mA, of makes L&T Exora / Siemens / GE / ABB / Standard / Havells /
HPL / Indo Asian / Toyoma.
Supply of 63A 4 Pole RCCB 100mA, of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of MCB type Change Over Switch 20A Double Pole 2 way 400V AC suitable to fix on Din Channel
of makes Legrand / Schneider.
MCB DISTRIBUTION BOARDS
(AS PER IS:13032)
Supply of 4 Way SPN DB with IP 20 Protection as per
IS:13032 and suitable for 4Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.
Supply of 8 Way SPN DB with IP 20 Protection as per
IS:13032 and suitable for 8Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.
Supply of 12 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 12Nos S.P out goings
and for 1 No Incommer etc complete of makes Legrand / Schneider.

Supply of 4 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 4Nos S.P out goings and
for 1 No Incommer etc complete of makes Legrand / Schneider.

Supply of 8 Way SPN DB with IP 43 Protection as per


IS:13032 and suitable for 8Nos S.P out goings and for 1 No
Incommer etc complete of makes Legrand / Schneider.
Supply of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 12Nos S.P out
goings and for 1 No Incommer etc complete of makes Legrand / Schneider.

Supply of 4 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 4Nos S.P out goings and
for 1 No Incommer etc complete of makes L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 8 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 8 Nos S.P out goings and
for 1 No Incommer etc complete of makes L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 12 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 12 Nos S.P out goings
and for 1 No Incommer etc complete of makes L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 4 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 4Nos S.P out
goings and for 1 NoIncommer etc completeof makes L&T Exora / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.

Supply of 8 Way SPN DB with IP 43 Protection as per


IS:13032 and suitable for 8 Nos S.P out goings and for 1 No
Incommer etc complete of makes L&T Exora / Siemens / GE
/ ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 12 Nos S.P out
goings and for 1 No Incommer etc complete of makes L&T Exora / Siemens / GE / ABB / Standard /
Havells / HPL / Indo Asian / Toyoma.

Supply of 4 Way SPN DB with IP 20 Protection as per


IS:13032 and suitable for 4Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal
/ Bentec.
Supply of 8 Way SPN DB with IP 20 Protection as per
IS:13032 and suitable for 8 Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal
/ Bentec.
Supply of 12 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 12 Nos S.P out
goings and for 1 No Incommer etc complete of makes Milltec / Sputnik / Crystal / Bentec / Gold Medal.

Supply of 4 Way SPN DB with IP 43 Protection as per


IS:13032 and suitable for 4Nos S.P out goings and for 1 No Incommer etc complete of makes Milltec /
Sputnik / Crystal
/ Bentec / Gold Medal.

Supply of 8 Way SPN DB with IP 43 Protection as per


IS:13032 and suitable for 8 Nos S.P out goings and for 1 No
Incommer etc complete of makes Milltec / Sputnik / Crystal
/ Bentec / Gold Medal.
Supply of 12 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 12 Nos S.P out
goings and for 1 No Incommer etc complete of makes Milltec / Sputnik / Crystal / Bentec / Gold Medal.

Supply of 4 Way TPN DB Horizontal with IP 20 Protection as


per IS:13032 and suitable for 12 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Legrand / Schneider.
Supply of 8 Way TPN DB Horizontal with IP 20 Protection as
per IS:13032 and suitable for 24 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Legrand / Schneider.
Supply of 12 Way TPN DB Horizontal with IP 20 Protection
as per IS:13032 and suitable for 36 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete of
makes Legrand
/ Schneider.
Supply of 4 Way TPN DB Horizontal with IP 43 Protection as
per IS:13032 and suitable for 12 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Legrand / Schneider.
Supply of 8 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 24 Nos S.P.
out goings and for
1 No 4 pole Incommer etc complete of makes Legrand / Schneider.
Supply of 12 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and suitable for 36 Nos S.P.
out goings and for 1 No 4 pole Incommer etc complete of makes Legrand
/ Schneider.

Supply of 4 Way TPN DB Vertical with IP 20 Protection as per IS:13032 and suitable for 12 Nos S.P. out
goings and for
1 No 4 pole Incommer etc complete of makes Legrand / Schneider.
Supply of 8 Way TPN DB Vertical with IP 20 Protection as per IS:13032 and suitable for 24 Nos S.P. out
goings and for
1 No 4 pole Incommer etc complete of makes Legrand / Schneider.
Supply of 12 Way TPN DB Vertical with IP 20 Protection as
per IS:13032 and suitable for 36 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Legrand /
Schneider.
Supply of 4 Way VTPN DB suitable for accommodating 4 pole Isolator as incomer with IP 43 Protection as
per IS:13032 and suitable for 4Nos T.P. out goings etc complete of makes Legrand / Schneider.

Supply of 6 Way VTPN DB suitable for accommodating 4 pole Isolator as incomer with IP 43 Protection
as per IS:13032 and suitable for 6 Nos T.P. out goings etc complete of makes Legrand / Schneider.

Supply of 8 Way VTPN DB suitable for accommodating 4 pole Isolator as incomer with IP 43 Protection
as per IS:13032 and suitable for 8 Nos T.P. out goings etc complete of makes Legrand / Schneider.

Supply of 12 Way VTPN DB suitable for accommodating 4 pole Isolator as incomer with IP 43 Protection
as per IS:13032 and suitable for 12 Nos T.P. out goings etc complete of makes Legrand / Schneider.

Supply of 7 Segment 4 Way TPN DB with IP 42 Protection with provision for FPMCB / Isolator / RCCB /
RCBO as incomer, 3Nos DPMCB / Isolator / RCCB / RCBO as sub incomer and 12 Nos SPMCB's as
out going of makes Legrand / Schneider.

Supply of 7 Segment 8 Way TPN DB with IP 42 Protection


with provision for FPMCB / Isolator / RCCB / RCBO as incomer, 3Nos DPMCB / Isolator / RCCB / RCBO
as sub incomer and 24Nos SPMCB's as out going of makes Legrand
/ Schneider.

Supply of 4 Way TPN DB suitable for accomodating 125A 4


Pole MCCB as incomer and 4 Nos TP MCBs as outgoing and with IP 43 Protection of makes Legrand /
Schneider.
Supply of 8 Way TPN DB suitable for accomodating 125A 4
Pole MCCB as incomer and 8 Nos TP MCBs as outgoing and with IP 43 Protection of makes Legrand /
Schneider.
Supply of 20A SP Plug and Socket in SS enclosure of makes
Legrand / Schneider.
Supply of 20A TP Plug and Socket in SS enclosure of makes
Legrand / Schneider.
Supply of 32A TP Plug and Socket in SS enclosure of makes
Legrand / Schneider.
Supply of 4 Way TPN DB Horizontal with IP 20 Protection as
per IS:13032 and suitable for 12 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes L&T Exora / Siemens / GE / ABB / Standard / Havells /
HPL / Indo Asian / Toyoma.
Supply of 8 Way TPN DB Horizontal with IP 20 Protection as
per IS:13032 and suitable for 24 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes L&T Exora /
Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.
Supply of 12 Way TPN DB Horizontal with IP 20 Protection as per IS:13032 and suitable for 36 Nos S.P.
out goings and for 1 No 4 pole Incommer etc complete of makes L&T Exora / Siemens / GE / ABB /
Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 4 Way TPN DB Horizontal with IP 43 Protection as


per IS:13032 and suitable for 12 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes L&T Exora / Siemens / GE / ABB / Standard / Havells /
HPL / Indo Asian / Toyoma.

Supply of 8 Way TPN DB Horizontal with IP 43 Protection as


per IS:13032 and suitable for 24 Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes L&T Exora / Siemens / GE / ABB / Standard / Havells /
HPL / Indo Asian / Toyoma.
Supply of 12 Way TPN DB Horizontal with IP 43 Protection
as per IS:13032 and suitable for 36 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete of
makes L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 4 Way VTPN DB suitable for accommodating 4


pole Isolator as incomer with IP 20 Protection as per
IS:13032 and suitable for 4Nos T.P. out goings etc complete of makes L&T Exora / Siemens / GE / ABB /
Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 8 Way VTPN DB suitable for accommodating 4


pole Isolator as incomer with IP 20 Protection as per IS:13032 and suitable for 8 Nos T.P. out goings and
for etc complete of makes L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
Supply of 12 WayVTPN DB suitable for accommodating 4
pole Isolator as incomer with IP 20 Protection as per IS:13032 and suitable for 12 Nos T.P. out goings etc
complete of makes L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.
Supply of 4 Way VTPN DB suitable for accommodating 4
pole Isolator as incomer with IP 43 Protection as per IS:13032 and suitable for 4Nos T.P. out goings etc
complete of makes L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 6 Way VTPN DB suitable for accommodating 4


pole Isolator as incomer with IP 43 Protection as per IS:13032 and suitable for 4Nos T.P. out goings etc
complete of makes L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 8 Way VTPN DB suitable for accommodating 4


pole Isolator as incomer with IP 43 Protection as per IS:13032 and suitable for 8 Nos T.P. out goings etc
complete of makes L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 12 Way VTPN DB suitable for accommodating 4 pole Isolator as incomer with IP 43
Protection as per IS:13032 and suitable for 12Nos T.P. out goings etc complete of makes L&T
Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 7 Segment 4 Way TPN DB Vertical with IP 43


Protection with provision for FPMCB / Isolator / RCCB / RCBO as incomer, 3Nos DPMCB / Isolator /
RCCB / RCBO as sub incommer and 12Nos SPMCB's as out goings of makes L&T Exora / Siemens /
GE / ABB / Standard / Havells / HPL / Indo Asian / Toyoma.

Supply of 7 Segment 8 Way TPN DB Vertical with IP 43 Protection with provision for FPMCB /
Isolator / RCCB / RCBO as incomer, 3Nos DPMCB / Isolator / RCCB / RCBO as sub incommer and
12Nos SPMCB's of makes L&T Exora / Siemens / GE / ABB / Standard / Havells / HPL / Indo Asian /
Toyoma.

Supply of 4 Way TPN DB Horizontal with IP 20 Protection as


per IS:13032 and suitable for 12Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Gold Medal /
Milltec / Sputnik / Crystal / Bentec.
Supply of 8 Way TPN DB Horizontal with IP 20 Protection as
per IS:13032 and suitable for 24Nos S.P. out goings and for
1 No 4 pole Incommer etc completeof makes Gold Medal /
Milltec / Sputnik / Crystal / Bentec.
Supply of 12 Way TPN DB Horizontal with IP 20 Protection
as per IS:13032 and suitable for 36Nos S.P. out goings and for 1 No 4 pole
makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Incommer etc complete of

Supply of 4 Way TPN DB Horizontal with IP 43 Protection as


per IS:13032 and suitable for 12Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 6 Way TPN DB Horizontal with IP 43 Protection as


per IS:13032 and suitable for 18Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 8 Way TPN DB Horizontal with IP 43 Protection as


per IS:13032 and suitable for 24Nos S.P. out goings and for
1 No 4 pole Incommer etc complete of makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 12 Way TPN DB Horizontal with IP 43 Protection


as per IS:13032 and suitable for 36 Nos S.P. out goings and for 1 No 4 pole Incommer etc complete of
makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 4 Way VTPN DB suitable for accommodating 4


pole Isolator as incomer with IP 20 Protection as per IS:13032 and suitable for 4 Nos T.P. out goings etc
complete of makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 6 Way VTPN DB suitable for accommodating 4 pole Isolator as incomer with IP 20 Protection as
per IS:13032 and suitable for 6 Nos T.P. out goings and for 1 No 4 pole Incommer etc complete of
makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 8 Way VTPN DB suitable for accommodating 4


pole Isolator as incomer with IP 20 Protection as per IS:13032 and suitable for 8 Nos T.P. out goings etc
complete of makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 4 Way VTPN DB suitable for accommodating 4


pole Isolator as incomer with IP 43 Protection as per IS:13032 and suitable for 4 Nos T.P. out goings etc
complete of makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 8 Way VTPN DB suitable for accommodating 4


pole Isolator as incomer with IP 43 Protection as per IS:13032 and suitable for 8 Nos T.P. out goings etc
complete of makes Gold Medal / Milltec / Sputnik / Crystal / Bentec.

Supply of 12 Way VTPN DB suitable for accommodating 4 pole Isolator as incomer with IP 43 Protection
as per IS:13032 and suitable for 12 Nos T.P. out goings etc complete of makes Gold Medal / Milltec /
Sputnik / Crystal
/ Bentec.
Supply of 20A SP Plug and Socket in SS enclosure of makes
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of 20A TP Plug and Socket in SS enclosure of makes
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of 32A TP Plug and Socket in SS enclosure of makes
Gold Medal / Milltec / Sputnik / Crystal / Bentec.
Supply of SP Enclosure with IP 20 Protection of makes
Legrand / Schneider.
Supply of DP/TP/FP Metal Enclosure with IP 20 Protection
of makes Legrand / Schneider.
SECTION - 3
STREET LIGHT LUMINAIRES
Supply of 1 x 36/40 W fluorescent street light luminaire with sheet alluminium housing and UV
stabilised acrylic cover with all standard accessories etc of makes Wipro / G.E. / Phillips / Bajaj /
Crompton.
Supply of 1 x 36/40 W fluorescent street light luminaire with sheet alluminium housing and UV stabilised
acrylic cover with all standard accessories etc of makes HPL / Surya / Havells.

Supply of 1 x 36/40 W fluorescent street light luminaire with sheet alluminium housing and UV
stabilised acrylic cover with all standard accessories etc of makes Elton / RK / Style Lamp / Mahita
Electro / Capart / Akhil.

Supply of 70W SV / MH Street light luminaire integral with pressure diecast alluminium housing having pot
optics with IP66 protection with all standard accessories etc of makes Wipro / G.E. / Phillips / Bajaj /
Crompton.
Supply of 70W SV / MH Street light luminaire integral with
pressure diecast alluminium housing having pot optics with IP66 protection with all standard accessories
etc of makes HPL / Surya / Havells.
Supply of 70W SV / MH Street light luminaire integral with
pressure diecast alluminium housing having pot optics with IP66 protection with all standard accessories
etc of makes Elton / RK / Style Lamp / Mahita Electro / Capart / Akhil.

Supply of 150W SV / MH Street light luminaire integral with


pressure diecast alluminium housing having pot optics with IP66 protection with all standard accessories
etc of makes Wipro / G.E. / Phillips / Bajaj / Crompton.

Supply of 150W SV / MH Street light luminaire integral with


pressure diecast alluminium housing having pot optics with IP66 protection with all standard accessories
etc of makes HPL / Surya / Havells / Venture.
Supply of 150W SV / MH Street light luminaire integral with
pressure diecast alluminium housing having pot optics with IP66 protection with all standard accessories
etc of makes Elton / RK / Style Lamp / Mahita Electro / Capart / Akhil.

Supply of 250W SV / MH Street light luminaire integral with


pressure diecast alluminium housing having pot optics with IP66 protection with all standard accessories
etc of makes Wipro / G.E. / Phillips / Bajaj / Crompton.

Supply of 250W SV / MH Street light luminaire integral with pressure diecast alluminium housing having
pot optics with IP66 protection with all standard accessories etc of makes HPL / Surya / Havells / Venture.

Supply of 250W SV / MH Street light luminaire integral with


pressure diecast alluminium housing having pot optics with IP66 protection with all standard accessories
etc of makes Elton / RK / Style Lamp / Mahita Electro / Capart / Akhil.

Supply of 150W MH Flood light luminaire with integral


weather proof diecast alluminium housing with IP66 protection
makes Wipro / G.E. / Phillips / Bajaj / Crompton.

with all standard accessories etc of

Supply of 150W MH Flood light luminaire with integral weather proof diecast alluminium housing
IP66 protection with all standard accessories etc of makes HPL / Surya / Havells / Venture.

with

Supply of 150W MH Flood light luminaire with integral weather proof diecast alluminium housing with
IP66 protection with all standard accessories etc of makes Elton / RK / Style Lamp / Mahita Electro /
Capart / Akhil.
Supply of 250W MH Flood light luminaire with integral
weather proof diecast alluminium housing with IP66
protection with all standard accessories etc of makes
Wipro / G.E. / Phillips / Bajaj / Crompton.
Supply of 250W MH Flood light luminaire with integral
weather proof diecast alluminium housing with IP66
protection with all standard accessories etc of makes HPL / Surya / Havells / Venture.

Supply of 250W MH Flood light luminaire with integral


weather proof diecast alluminium housing
with IP66 protection with all standard accessories etc of
makes Elton
/ RK / Style Lamp / Mahita Electro / Capart / Akhil.
Supply of 400W MH Flood light luminaire with integral
weather proof diecast alluminium housing with IP66 protection
makes Wipro / G.E. / Phillips / Bajaj / Crompton.

with all standard accessories etc of

Supply of 400W MH Flood light luminaire with integral


weather proof diecast alluminium housing with IP66 protection with all standard accessories etc of
makes HPL / Surya / Havells / Venture.
Supply of 250W MH Flood light luminaire with Non integral weather proof diecast alluminium housing with IP66 protection with Control Gear Box without
lamp of makes Wipro / G.E. / Phillips / Bajaj / Crompton.

Supply of 250W MH Flood light luminaire with Non integral weather proof diecast alluminium housing with IP66 protection with Control Gear Box without
lamp of makes HPL / Surya / Havells / Venture.
Supply of 250W MH Flood light luminaire with Non - integral weather proof diecast alluminium
housing with IP66 protection with Control Gear Box without lamp of makes Elton / RK / Style Lamp /
Mahita Electro / Capart / Akhil.

Supply of 2 x 250W MH Flood light luminaire with Non integral weather proof diecast alluminium housing with IP66 protection with Control Gear Box without
lamp of makes Wipro / G.E. / Phillips / Bajaj / Crompton.

Supply of 2 x 250W MH Flood light luminaire with Non integral weather proof diecast alluminium housing with IP66 protection with Control Gear Box without
lamp of makes Surya / HPL / Transrail.
Supply of 400W MH Flood light luminaire with Non integral weather proof diecast alluminium housing with IP66 protection with Control Gear Box without
lamp of makes Wipro / G.E. / Phillips / Bajaj / Crompton.

Supply of 400W MH Flood light luminaire with Non integral weather proof diecast alluminium housing with IP66 protection with Control Gear Box without
lamp of makes Surya / HPL / Transrail.
Supply of 400W MH Flood light luminaire with Non - integral weather proof diecast alluminium
housing with IP66 protection with Control Gear Box without lamp of makes Elton / RK / Style Lamp /
Mahita Electro / Capart / Akhil.

Supply of 2 x 400W MH Flood light luminaire with Non - integral weather proof diecast alluminium
housing
with IP66 protection with Control Gear Box without lamp of makes Wipro / G.E. / Phillips /
Bajaj / Crompton.
Supply of 2 x 400W MH Flood light luminaire with Non integral weather proof diecast alluminium housing with IP66 protection with Control Gear Box without
lamp of makes Surya / HPL / Transrail.
Supply of 500W Hallozen Flood light luminaire with cast alluminium housing and tough end glass
cover with all standard accessories of makes Wipro / G.E. / Phillips / Bajaj / Crompton.

Supply of 500W Hallozen Flood light luminaire with cast alluminium housing and tough end glass cover
with all standard accessories of makes Surya / HPL / Transrail.

Supply of 500W Hallozen Flood light luminaire with cast


alluminium housing and tough end glass cover with all standard accessories of makes Elton / RK / Style
Lamp / Mahita Electro / Capart / Akhil.
Supply of 1000W Hallozen Flood light luminaire with cast
alluminium housing and tough end glass cover with all standard accessories of makes Wipro / G.E. /
Phillips / Bajaj
/ Crompton.
Supply of 1000W Hallozen Flood light luminaire with cast
alluminium housing and tough end glass cover with all standard accessories of makes Surya / HPL /
Transrail.
Supply of 1000W Hallozen Flood light luminaire with cast
alluminium housing and tough end glass cover with all standard accessories of makes Elton / RK / Style
Lamp / Mahita Electro / Capart / Akhil.
Supply of 1 x 26W CFL well glass, low bay luminaire with die
cast alluminium housing epoxy gray powder coated built in Electronic ballast with gink plated wire guard
and eye bolt of make Wipro / GE / Phillips / Crompton / Bajaj.

POST TOP LANTERN LUMINAIRES


Supply of 1 x 18W CFL integral post top luminaire with conical shape, opal clear acrylic diffuser with
cast alluminium pole mounting capsule complete with all accessories and ballast of makes Crompton /
Bajaj / Surya / K Lite / HPL.

Supply of 70W SV / MH integral HID lamp post top lantern BJDPTI 70SV/ MH LPF or its equivalent with
diamond / Mushroom /Spherical diffuser etc complete with all accessories of makes Wipro / Phillips / Bajaj
/ Crompton / Surya / HPL.

ACCESSORIES FOR MV / SV / MH LUMINAIRES


COPPER BALLASTS
Supply of 80W MV copper ballast of makes G.E. / Phillips /
Crompton / Bajaj / Surya / Havells.
Supply of 80W MV copper ballast of makes RK / Style Lamp
/ Akhil / Capart.
Supply of 125W MV copper ballast.of makes G.E. / Phillips /
Crompton / Bajaj / Surya / Havells.
Supply of 125W MV copper ballast.of makes RK / Style
Lamp / Akhil / Capart.
Supply of 70 W SV / MH copper ballast.of makes Wipro / G.E. / Phillips / Thorn.

Supply of 70 W SV / MH copper ballast.of makes Crompton


/ Bajaj / Surya / HPL / Havells / Venture.
Supply of 70 W SV / MH copper ballast.of makes RK / Style
Lamp / Akhil / Capart.
Supply of 150 W SV / MH copper ballast.of makes Wipro /
G.E. / Phillips / Thorn.

Supply of 150 W SV / MH copper ballast.of makes


Crompton / Bajaj / Surya / HPL / Havells / Venture.
Supply of 150 W SV / MH copper ballast.of makes RK / Style Lamp / Akhil / Capart.

Supply of 250 W SV / MH copper ballast.of makes Wipro /


G.E. / Phillips / Thorn.
Supply of 250 W SV / MH copper ballast.of makes Crompton / Bajaj / Surya / HPL / Havells /
Venture.
Supply of 250 W SV / MH copper ballast.of makes RK / Style
Lamp / Akhil / Capart.
Supply of 400 W SV / MH copper ballast.of makes Wipro /
G.E. / Phillips / Thorn.
Supply of 400 W SV / MH copper ballast.of makes Crompton / Bajaj / Surya / HPL / Havells /
Venture.
Supply of 400 W SV / MH copper ballast.of makes RK / Style
Lamp / Akhil / Capart.
Supply of Ignitor for SV / MH Lamp of makes Wipro / G.E. /
Phillips / Crompton / Bajaj / Surya / HPL / Havells / Venture.
Supply of 4 mfd HPF Capacitor of makes Wipro / G.E. / Phillips make
Supply of 10 mfd HPF Capacitor of makes Wipro / G.E. /
Phillips make
Supply of 15 mfd HPF Capacitor of makes Wipro / G.E. /
Phillips make
Supply of 20 mfd HPF Capacitor of makes Wipro / G.E. /
Phillips make
Supply of 33 mfd HPF Capacitor of makes Wipro / G.E. /
Phillips make
Supply of 42 mfd HPF Capacitor of makes Wipro / G.E. /
Phillips make

ENEGRY SAVING ELECTRONIC BALLAST FOR STREET LIGHT


Supply of 70W SV / MH Electronic ballast having < 3W loss, PF > 0.90, THD < 15% of makes Trinic /
Fortune Art or its equivalent.
Supply of 150W SV / MH Electronic ballast having < 3W loss,
PF > 0.90, THD < 15% of makes Trinic / Fortune Art or its equivalent.
Supply of 250W SV / MH Electronic ballast having < 3W loss,
PF > 0.90, THD < 15% of makes Trinic / Fortune Art or its equivalent.
Supply of 400W SV / MH Electronic ballasthaving < 3W loss, PF > 0.90, THD < 15% of makes Trinic /
Fortune Art or its equivalent.
BALLASTS FOR INDUCTION LAMPS

Supply of 40W ballasts for Induction Lamp of Makes Make:Crompton / Bajaj / Synergy Solutions /
Fortune Art / Billion Light
Supply of 80W ballasts for Induction Lamp of Makes
Make:Crompton / Bajaj / Synergy Solutions / Fortune Art / Billion Light
Supply of 120W ballasts for Induction Lamp of Makes
Make:Crompton / Bajaj / Synergy Solutions / Fortune Art / Billion Light
Supply of 150W ballasts for Induction Lamp of Makes Make:Crompton / Bajaj / Synergy Solutions /
Fortune Art / Billion Light
Supply of 200W ballasts for Induction Lamp of Makes
Make:Crompton / Bajaj / Synergy Solutions / Fortune Art / Billion Light
Supply of 400W ballasts for Induction Lamp of Makes
Make:Crompton / Bajaj / Synergy Solutions / Fortune Art / Billion Light
LAMPS
Supply of 500W Hallozen Lamp with ISI mark of makes
Wipro / G.E. / Phillips / Osram.
Supply of 500W Hallozen Lamp with ISI mark of makes
Crompton / Bajaj / Surya / HPL / Havells.
Supply of 500W Hallozen Lamp with ISI mark of makes Elton
/ Style Lamp / Mahita Electro / Capart
Supply of 1000W Hallozen Lamp with ISI mark of makes
Wipro / G.E. / Phillips / Osram.
Supply of 1000W Hallozen Lamp with ISI mark of makes
Crompton / Bajaj / Surya / HPL / Havells.
Supply of 1000W Hallozen Lamp with ISI mark of makes
Elton / Style Lamp / Mahita Electro / Capart
Supply of 70W SV Lamp with ISI mark of makes Wipro / G.E. / Phillips / Osram.

Supply of 70W SV Lamp with ISI mark of makes Crompton / Bajaj / Surya / HPL / Havells / Venture.

Supply of 70W SV Lamp with ISI mark of makes Elton / Style Lamp / Mahita Electro / Capart

Supply of 150W SV Lamp with ISI mark of makes Wipro / G.E. / Phillips / Osram.

Supply of 150W SV Lamp with ISI mark of makes Crompton / Bajaj / Surya / HPL / Havells / Venture.

Supply of 150W SV Lamp with ISI mark of makes Elton /


Style Lamp / Mahita Electro / Capart
Supply of 250W SV Lamp with ISI mark of makes Wipro /
G.E. / Phillips / Osram.

Supply of 250W SV Lamp with ISI mark of makes Crompton


/ Bajaj / Surya / HPL / Havells / Venture.
Supply of 250W SV Lamp with ISI mark of makes Elton / Style Lamp / Mahita Electro / Capart

Supply of 400W SV Lamp with ISI mark of makes Wipro /


G.E. / Phillips / Osram.
Supply of 400W SV Lamp with ISI mark of makes Crompton
/ Bajaj / Surya / HPL / Havells / Venture.
Supply of 400W SV Lamp with ISI mark of makes Elton /
Style Lamp / Mahita Electro / Capart
Supply of 70W double end MH Lamp with ISI mark of makes
Wipro / G.E. / Phillips / Osram.
Supply of 70W double end MH Lamp with ISI mark of makes
Crompton / Bajaj / Surya / HPL / Havells.
Supply of 70W double end MH Lamp with ISI mark of makes
Elton / Style Lamp / Mahita Electro / Capart
Supply of 150W double end MH Lamp with ISI mark of
makes Wipro / G.E. / Phillips / Osram.
Supply of 150W double end MH Lamp with ISI mark of
makes Crompton / Bajaj / Surya / HPL / Havells.
Supply of 150W double end MH Lamp with ISI mark of
makes Elton / Style Lamp / Mahita Electro / Capart
Supply of 70W MH Lamp with ISI mark of makes Crompton
/ Bajaj / Surya / HPL / Havells.
Supply of 70W MH Lamp with ISI mark of makes Elton /
Style Lamp / Mahita Electro / Capart
Supply of 150W MH Lamp with ISI mark of makes Wipro / G.E. / Phillips / Osram.

Supply of 150W MH Lamp with ISI mark of makes Crompton


/ Bajaj / Surya / HPL / Havells.
Supply of 150W MH Lamp with ISI mark of makes Elton /
Style Lamp / Mahita Electro / Capart
Supply of 250W MH Lamp with ISI mark of makes Wipro / G.E. / Phillips / Osram.

Supply of 250W MH Lamp with ISI mark of makes Crompton


/ Bajaj / Surya / HPL / Havells.
Supply of 250W MH Lamp with ISI mark of makes Elton /
Style Lamp / Mahita Electro / Capart

Supply of 400W MH Lamp with ISI mark of makes Wipro /


G.E. / Phillips / Osram.
Supply of 400W MH Lamp with ISI mark of makes Crompton
/ Bajaj / Surya / HPL / Havells.
Supply of 400W MH Lamp with ISI mark of makes Elton / Style Lamp / Mahita Electro / Capart

Supply of 80W MV Lamp with ISI mark of makes Wipro /


G.E. / Phillips / Osram.
Supply of 80W MV Lamp with ISI mark of makes Crompton /
Bajaj / Surya / HPL / Havells.
Supply of 80W MV Lamp with ISI mark of makes Elton /
Style Lamp / Mahita Electro / Capart
Supply of 125W MV Lamp with ISI mark of makes Wipro /
G.E. / Phillips / Osram.
Supply of 125W MV Lamp with ISI mark of makes Crompton
/ Bajaj / Surya / HPL / Havells.
Supply of 125W MV Lamp with ISI mark of makes Elton /
Style Lamp / Mahita Electro / Capart
Supply of 250W MV Lamp with ISI mark of makes Wipro /
G.E. / Phillips / Osram.
Supply of 250W MV Lamp with ISI mark of makes Crompton
/ Bajaj / Surya / HPL / Havells.
Supply of 250W MV Lamp with ISI mark of makes Elton /
Style Lamp / Mahita Electro / Capart
Supply of 400W MV Lamp with ISI mark of makes Wipro /
G.E. / Phillips / Osram.
Supply of 400W MV Lamp with ISI mark of makes Crompton
/ Bajaj / Surya / HPL / Havells.
Supply of 400W MV Lamp of makes Elton / Style Lamp / Mahita Electro / Capart
NATURE SWITCHES
Supply of Swadeep Nature Switch or its equivalent with suitable
contactor suitable to control the load of 3 KW of single phase load.

SMC

enclousure,

MCBs

Supply of Swadeep Nature Switch or its equivalent with


suitable SMC enclousure, MCBs contactor suitable to control the load of 5 KW of single phase
load.
Supply of Swadeep Nature Switch or its equivalent with
suitable SMC enclousure, MCBs contactor suitable to
control the load of 8 KW of single phase load.

Supply of Swadeep Nature Switch or its equivalent with


suitable SMC enclousure, MCBs contactor suitable to control the load of 5 KW of Three phase
load.
Supply of Swadeep Nature Switch or its equivalent with
suitable SMC enclousure, MCBs contactor suitable to control the load of 8 KW of Three phase
load.
Supply of Swadeep Nature Switch or its equivalent with
suitable SMC enclousure, MCBs contactor suitable to control the load of 12 KW of Three phase
load.
INTERNAL LUMINAIRES
Supply of 1 x 11W Mirror light with all standard accessories
diffuser of makes G.E. / Phillips / Crompton / Bajaj.
Supply of 1 x 11W Mirror light with all standard accessories
diffuser of makes Surya / Havells / HPL / Fortune Art
Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel housing with VPIT
Chokes and all standard accessories of makes Crompton / Bajaj / Surya / Havells / HPL / Fortune Art

Supply of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel housing with
Electronic Ballast Chokes and all standard accessoriesof makes Wipro / G.E. / Phillips / Crompton /
Bajaj .
Supply of 1 x 36/40W Box type tube light luminaire powder
coated CRCA sheet steel housing with Electronic Ballast
Chokes and all standard accessoriesof makes Surya / Havells / HPL / Fortune Art

Supply of 2 x 36/40W Box type tube light luminaire powder


coated CRCA sheet steel housing with Electronic Ballast Chokes and all standard accessoriesof makes
Wipro / G.E. / Phillips / Crompton / Bajaj.
Supply of 2 x 36/40W Box type tube light luminaire powder
coated CRCA sheet steel housing with Electronic Ballast Chokes and all standard accessoriesof
makes Surya / Havells / HPL / Fortune Art
Supply of 1 x 36/40W Patty type tube light luminaire
powder coated CRCA sheet steel housing with Copper Chokes and all standard accessories of makes
Crompton / Bajaj / Surya / Havells / HPL / Fortune Art

Supply of 1 x 36/40W Patty type tube light luminaire


powder coated CRCA sheet steel housing with Copper Chokes and all standard accessories of makes
Elton / RK / Million / Gold Medal / Vimal / Akhil.

Supply of 2 x 36/40W Surface /Recessed mounting mirror optic luminaire with powder coated CRCA
sheet steel housing with alluminium mirror reflector and decorative end plates with Electronic Ballast of
makes Wipro/G.E./Phillips/Thorn / Crompton.

Supply of 2 x 36/40W Surface / Recessed mounting mirror optic luminaire with powder coated CRCA
sheet steel housing with alluminium mirror reflector and decorative end plates with Electronic Ballast,
of makes Bajaj / Surya / HPL / Havells.

Supply of 2 x 36W CFL Paralite louvre (P5) Surface / Recessed low glare Mirror Optic luminaire
comprising bright anodised alluminium reflector with Electronic Ballst of makes Wipro / G.E. / Phillips /
Crompton / Bajaj.
Supply of 2 x 36W CFL Paralite louvre (P5) Surface /Recessed low glare Mirror Optic luminaire
comprising bright anodised alluminium reflector with Electronic Ballst of makes Surya / Havells.

Supply of 2 x 36W CFL Direct / Indirect Recessed low glare Mirror Optic luminaire comprising bright
anodised alluminium reflector with Electronic Ballst of makes Wipro / G.E. / Phillips / Thorn / Crompton /
Bajaj.
Supply of 2 x 36W CFL Direct / Indirect Recessed low glare
Mirror Optic luminaire comprising bright anodised alluminium reflector with Electronic Ballst of makes
Surya / Havells / Trinic / HPL / Fortune Art
Supply of 1 x 13/18W Indoor recessed mounting horizontal type down lights luminaire with
alluminium/Matt finished reflecttor with Electronic Ballast of makes Wipro / G.E. / Phillips / Crompton /
Bajaj.
Supply of 1 x 13/18W Indoor recessed mounting horizontal
type down lights luminaire with alluminium/Matt finished reflecttor with Electronic Ballast of makes Surya /
Havells / HPL / Fortune Art
Supply of 2 x 13/18W Indoor recessed mounting horizontal
type down lights luminaire with alluminium/Matt finished reflecttor with Electronic Ballast of makes Wipro /
G.E. / Phillips / Crompton / Bajaj.
Supply of 2 x 13/18W Indoor recessed mounting horizontal
type down lights luminaire with alluminium/Matt finished reflecttor with Electronic Ballast of makes Surya /
Havells / HPL / Fortune Art
Supply of 1 x 13/18W Indoor recessed mounting horizontal type down lights luminaire with Frosted glass
cover reflecttor with Electronic Ballast of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 1 x 13/18W Indoor recessed mounting horizontal type down lights luminaire with Frosted glass
cover reflecttor with Electronic Ballast of makes Surya / Havells / HPL / Fortune Art

Supply of 2 x 13/18W Indoor recessed mounting horizontal type down lights luminaire with Frosted glass
cover reflecttor with Electronic Ballast of makes Wipro /G.E. / Phillips /Crompton / Bajaj.

Supply of 2 x 13/18W Indoor recessed mounting horizontal


type down lights luminaire with Frosted glass cover
reflecttor with Electronic Ballast of makes Surya / Havells / HPL / Fortune Art
Supply of Recessed mounting 12V 50W adjustable Halozen down light with white colour gold shade
including transformer Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of Recessed mounting 12V 50W adjustable Halozen down light with white colour gold shade
including transformer of make Crompton / Bajaj / Surya / HPL / Havells.
Supply of Recessed mounting 12V 50W zoom type Halozen
down light with white colour gold shade including transformer of makes Wipro / G.E. / Phillips / Crompton /
Bajaj.
Supply of Recessed mounting 12V 50W zoom type Halozen down light with white colour gold shade
including transformer of makes Surya / Havells.
Supply of 9/13W VPIT Ballast for CFL with ISI mark of makes
Wipro / G.E. / Phillips / Crompton / Bajaj.
Supply of 9/13W VPIT Ballast for CFL with ISI mark of makes
Surya / Havells / HPL / Fortune Art
Supply of 9/13W VPIT Ballast for CFL with ISI mark of makes
Elton / RK / Style Lamp / Mahita Electro / Capart
Supply of 18W VPIT Ballast for CFL with ISI mark of makes
Wipro / G.E. / Phillips / Crompton / Bajaj.
Supply of 18W VPIT Ballast for CFL with ISI mark of makes
Surya / Havells / HPL / Fortune Art
Supply of 18W VPIT Ballast for CFL with ISI mark of makes
Elton / RK / Style Lamp / Mahita Electro / Capart
Supply of 20W Copper Wound Ballast
G.E. / Phillips / Crompton / Bajaj.

of makes Wipro /

Supply of 20W Copper Wound Ballast of makes Surya / Havells / HPL / Fortune Art

Supply of 20W Copper Wound Ballast of makes Elton / RK /


Ballast Makers / Krishilite / Style Lamp / Akhil / Capart / Million / Gold Medal / Vimal.

Supply of 40W Copper Wound Ballast of makes Wipro / G.E.


/ Phillips / Crompton / Bajaj.
Supply of 40W Copper Wound Ballast of makes Surya /
Havells / HPL / Fortune Art
Supply of 40W Copper Wound Ballast of makes Elton / RK /
Ballast Makers / Krishilite / Style Lamp / Akhil / Capart / Million / Gold Medal / Vimal.

Supply of 18/20W VPIT Ballast Wipro / G.E. / Phillips /


Crompton / Bajaj.
Supply of 18/20W VPIT Ballast Surya / Havells / HPL /
Fortune Art
Supply of 18/20W VPIT Ballast Elton / RK / Style Lamp / Mahita Electro / Capart

Supply of 36/40W VPIT Ballast Wipro / G.E. / Phillips /


Crompton / Bajaj.
Supply of 36/40W VPIT Ballast Surya / Havells / HPL / Fortune Art
Supply of 36/40W VPIT Ballast Elton / RK / Style Lamp /
Mahita Electro / Capart / Million / Gold Medal / Vimal.
Supply of 40W Starter of makes Wipro / G.E. / Phillips / Crompton / Bajaj.
Supply of 40W Starter of makes Surya / Havells / HPL /
Fortune Art
Supply of 40W Starter of makes Elton / RK / Style Lamp /
Mahita Electro / Capart / Million / Gold Medal / Vimal.
Supply of Rotor holder(FTL) of makes Wipro / G.E. / Phillips
/ Crompton / Bajaj.
Supply of Rotor holder(FTL) of makes Surya / Havells / HPL
/ Fortune Art
Supply of Rotor holder(FTL) of makes Elton / RK / Style Lamp / Mahita Electro / Capart
Gold Medal / Vimal.

/ Million /

Supply of HID Lamp holder of makes Wipro / G.E. / Phillips /


Crompton / Bajaj.
Supply of HID Lamp holder of makes Surya / Havells / HPL / Fortune Art
Supply of HID Lamp holder of makes Elton / RK / Style Lamp
/ Mahita Electro / Capart
Supply of CFL holder of makes Wipro / G.E. / Phillips /
Crompton / Bajaj.
Supply of CFL holder of makes Surya /
Fortune Art

Havells / HPL /

Supply of CFL holder of makes Elton / RK / Style Lamp /


Mahita Electro / Capart
Supply of FTL Starter holder of makes Wipro / G.E. / Phillips
/ Crompton / Bajaj.
Supply of FTL Starter holder of makes Surya / Havells.
Supply of FTL Starter holder of makes Elton / RK / Style
Lamp / Mahita Electro / Capart / Million / Gold Medal / Vimal.
Supply of 36W Electronic Ballast with total hormonic distortion is less than 10% for FTL of makes Wipro /
G.E. / Phillips / Crompton / Bajaj.
Supply of 36W Electronic BallasT with total hormonic distortion is less than 10% for FTL of makes Surya /
HPL / Havells.

Supply of 36W Electronic ballast with power factor greater than 0.9 to 0.95 suitable for FTL. Make :
Crompton Model
No.EBN 136D / Bajaj Model No.BJHF 136 / Havells LHBF 27904025 or its equivalent.

Supply of 2 x 36/40W Industrial Box type tube light


luminaire powder coated CRCA sheet steel housing with Electronic ballast and all standard accessories of
makes Crompton / Bajaj / Surya / HPL / Havells.

Supply of 4 x 14W TL 5 high efficiency recessed luminaire, epoxy powder coated CRCA sheet steel
housing, low glare with electronic ballast including cost of lamps etc., complete. Makes: Phillips Model
No.sereno-TBS 869 / Bajaj Model No.BTMRA 414 CAT II / Crompton Model No.CRTLU414EB/S.

Supply of 1 x 28W surface pendent mounting T5 Luminaire Box type with CRCA housing with Electronic
Ballast and all standard accessories of makes Phillips /Crompton /Bajaj / Surya / Havells.
Supply of 1 x 28W surface pendent mounting T5 Luminaire plastic housing with integrated
reflector extruded alluminium luminaire with Electronic Ballast and all standard accessories of makes
Phlillips / Crompton / Bajaj / Surya / Havells.
FLOURSCENT / CFL LAMPS
Supply of 40W-60W Lamp of makes Wipro / G.E. / Phillips /
Crompton / Bajaj.
Supply of 40W-60W Lamp of makes Surya / Havells / HPL / Fortune Art
Supply of Night Lamp of makes Wipro / G.E. / Phillips /
Crompton / Bajaj.
Supply of 18/20W fluorescent Lamp of makes Wipro / G.E. /
Phillips / Crompton / Bajaj.
Supply of 18/20W fluorescent Lamp of makes Surya /
Havells / HPL / Fortune Art
Supply of 18/20W fluorescent Lamp of makes Elton / Style Lamp / Mahita Electro / Capart

Supply of 36/40W fluorescent Lamp of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 36/40W fluorescent Lamp of makes Surya / Havells / HPL / Fortune Art

Supply of 36/40W fluorescent Lamp of makes Elton / Style Lamp / Mahita Electro / Capart

Supply of 28W T5 Lamp of makes Crompton / Bajaj / Phillips / Surya / Havells.

Supply of 9W Pin type CFL Lamp of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 9W Pin type CFL Lamp of makes Surya / Havells / HPL / Fortune Art

Supply of 11W Pin type CFL Lamp of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 11W Pin type CFL Lamp of makes Surya / Havells / HPL / Fortune Art

Supply of 13W Pin type CFL Lamp of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 13W Pin type CFL Lamp of makes Surya / Havells / HPL / Fortune Art

Supply of 18W Pin type CFL Lamp of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 18W Pin type CFL Lamp of makes Surya / Havells / HPL / Fortune Art

Supply of 26W Pin type CFL Lamp of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 26W Pin type CFL Lamp of makes Surya / Havells / HPL / Fortune Art

Supply of 36W Pin type CFL Lamp of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 36W Pin type CFL Lamp of makes Surya / Havells / HPL / Fortune Art

Supply of up to 5W Retrofit tiny CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 5W Retrofit tiny CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 8W Retrofit tiny CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 8W Retrofit tiny CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 10/11W Retrofit tiny CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 10/11W Retrofit tiny CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 13/14W Retrofit tiny CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 13/14W Retrofit tiny CFL of makes Surya / Havells / HPL / Fortune Art

Supply of 15W Retrofit tiny CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 15W Retrofit tiny CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 18/20W Retrofit CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 18/20W Retrofit

CFL of makes Surya / Havells / HPL / Fortune Art

Supply of 23W Retrofit CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of 23/25W Retrofit CFL of makes Surya / Havells / HPL / Fortune Art
Supply of up to 25/26W Retrofit CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 25/26W Retrofit

CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 9 W Non - Retrofit CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 9 W Non - Retrofit CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 11W Non - Retrofit CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 11W Non - Retrofit CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 13W Non - Retrofit CFL of makes Wipro /


G.E. / Phillips / Crompton / Bajaj.
Supply of up to 13W Non - Retrofit CFL of makes Surya /
Havells / HPL / Fortune Art
Supply of up to 18W Non - Retrofit CFL of makes Wipro /
G.E. / Phillips / Crompton / Bajaj.
Supply of up to 18W Non - Retrofit CFL of makes Surya /
Havells / HPL / Fortune Art
Supply of 0.5 LED lamp with input voltage 90-300v coloue tempurature 3000-6500k, beem angle 170-220
degree ,B22 base ,40lummens of make phillips /osram/GE/CROMPTON/VIN BALAJI/HAVELLS/HALONIX

Supply of 3.0 LED lamp with input voltage 90-300v coloue tempurature 3000-6500k, beem angle 170-220
degree ,B22 base ,40lummens of make phillips /osram/GE/CROMPTON/VIN BALAJI/HAVELLS/HALONIX

Supply of 5.0 LED lamp with input voltage 90-300v coloue tempurature 3000-6500k, beem angle 170-220
degree ,B22 base ,40lummens of make phillips /osram/GE/CROMPTON/VIN BALAJI/HAVELLS/HALONIX

Supply of 7.0 LED lamp with input voltage 90-300v coloue tempurature 3000-6500k, beem angle 170-220
degree ,B22 base ,40lummens of make phillips /osram/GE/CROMPTON/VIN BALAJI/HAVELLS/HALONIX

supply of led candle lamp foe shandliers make of


phillips /osram/GE/CROMPTON/VIN
BALAJI/HAVELLS/HALONIX
Supply of up to 9 W Non - Retrofit CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 9 W Non - Retrofit CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 11W Non - Retrofit CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 11W Non - Retrofit CFL of makes Surya / Havells / HPL / Fortune Art

Supply of up to 13W Non - Retrofit CFL of makes Wipro /


G.E. / Phillips / Crompton / Bajaj.
Supply of up to 13W Non - Retrofit CFL of makes Surya /
Havells / HPL / Fortune Art
Supply of up to 18W Non - Retrofit CFL of makes Wipro /
G.E. / Phillips / Crompton / Bajaj.
Supply of up to 18W Non - Retrofit CFL of makes Surya /
Havells / HPL / Fortune Art
Supply of up to 20W Non - Retrofit CFL of makes Wipro /
G.E. / Phillips / Crompton / Bajaj.
Supply of up to 20W Non - Retrofit CFL of makes Surya /
Havells / HPL / Fortune Art
Supply of up to 27W Non - Retrofit CFL of makes Wipro / G.E. / Phillips / Crompton / Bajaj.

Supply of up to 27W Non - Retrofit CFL of makes Surya /


Havells / HPL / Fortune Art
ENERGY CONSERVING FIXTURES
Supply of TRINIC / ELLIOT or its equivalent make 1 x 28W Patty type powder coated energy conserving
tube light luminaire with Electronic ballast operating voltage range of 90 volts to 350 volts power factor >
0.98 current less than 130ma crest factor and
total hormonic distortion shall be as per IS
Specification with auto cut off at high voltage suitable for 36/40W tube.

Supply of TRINIC / ELLIOT or its equivalent make 1 x 28W Box type powder coated energy conserving
tube light luminaire with Electronic ballast operating voltage range of 90 volts to 350 volts power factor >
0.98 current less than 130ma crest factor and total hormonic distortion shall be as per IS Specification
with auto cut off at high voltage suitable for
36/40W tube.

Supply of TRINIC / ELLIOT or its equvalent make Recessed mounted mirror optic luminaire with
paralite louvers (P5) suitable for 2 x 36W CFL lamps.Electronic ballast operating voltage range of 90 volts
to 350 volts power factor > 0.98 current less than 130ma crest factor and total hormonic distortion shall
be as per the IS Specification with auto cut off at High Voltage suitable for 36/40W tube.

Supply of 28 W Electronic Ballast with less than 10% total hormonic distortion and auto cut off at
High Voltage suitable for FTL Makes: TRINIC / ELLIOT or its equivalent make

LED LUMINAIRES INDOOR


Supply and Transportation of 6W Down lighter Recessed / Surface mounting made of diecast alluminium
body with powder coating acrylic diffuser Constant current out put of Driver operating voltage range of
150 to 265 Volts AC, Power factor > 0.9 high power 9 Nos of 1W LED 1 watt having efficacy of > 90
lumins/watt etc., complete. a)
LUMINAIRE MAKE : PHILLIPS /WIPRO /G.E. /MOSERBAER b) LED
MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SEOUL SEMI CONDUCTORS / SAMSUNG.

Supply and Transportation of 6W Down lighter Recessed / Surface mounting made of diecast alluminium
body with powder coating acrylic diffuser Constant current out put of Driver operating voltage range of
150 to 265 Volts AC, Power factor > 0.9 high power 9 Nos of 1W LED 1 watt having efficacy of > 90
lumins/watt etc., complete. a)
LUMINAIRE MAKE : PHILLIPS /WIPRO /G.E. /MOSERBAER b) LED
MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SEOUL SEMI CONDUCTORS / SAMSUNG.

Supply and Transportation of 9W Down lighter Recessed / Surface mounting made of diecast alluminium
body with powder coating acrylic diffuser Constant current out put of Driver operating voltage range of
150 to 265 Volts AC, Power factor > 0.9 high power 9 Nos of 1W LED 1 watt having efficacy of > 90
lumins/watt etc., complete. a)
LUMINAIRE MAKE : PHILLIPS /WIPRO /G.E. /MOSERBAER b) LED
MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SEOUL SEMI CONDUCTORS / SAMSUNG.

Supply and Transportation of 9W Down lighter Recessed / Surface mounting made of diecast alluminium
body with powder coating acrylic diffuser Constant current out put of Driver operating voltage range of
150 to 265 Volts AC, Power factor > 0.9 high power 9 Nos of 1W LED 1 watt having efficacy of > 90
lumins/watt etc., complete. a) LUMINAIRE MAKE : MIC / BLU / BAJAJ /CROMPTON GREAVES /
SURYA / ONIDA / FORTUNE ART / AVNI / SEMTRONICS / VIN
LED. b) LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM / SEOUL SEMI CONDUCTORS / SAMSUNG.

Supply and Transportation of 12W Down lighter Recessed / Surface mounting made of diecast alluminium
body with powder coating acrylic diffuser Constant current out put of Driver operating voltage range of
150 to 265 Volts AC, Power factor > 0.9 high power 9 Nos of 1W LED 1 watt having efficacy of > 90
lumins/watt etc., complete. a) LUMINAIRE MAKE : MIC / BLU / BAJAJ /CROMPTON GREAVES /
SURYA / ONIDA / FORTUNE ART / AVNI / SEMTRONICS / VIN
LED. b) LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM / SEOUL SEMI CONDUCTORS / SAMSUNG.

Supply and Transportation of 12W Down lighter Recessed / Surface mounting made of diecast alluminium
body with powder coating acrylic diffuser Constant current out put of Driver operating voltage range of
150 to 265 Volts AC, Power factor > 0.9 high power 9 Nos of 1W LED 1 watt having efficacy of > 90
lumins/watt etc., complete. a) LUMINAIRE MAKE : MIC / BLU / BAJAJ /CROMPTON GREAVES /
SURYA / ONIDA / FORTUNE ART / AVNI / SEMTRONICS / VIN
LED. b) LED MAKE : PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM / SEOUL SEMI CONDUCTORS / SAMSUNG.

Supply and Transportation of 18W Down lighter Recessed / Surface mounting made of diecast alluminium
body with powder coating acrylic diffuser Constant current out put of Driver operating voltage range of
150 to 265 Volts AC, Power factor > 0.9 high power 9 Nos of 2W LED 1 watt having efficacy of > 90
lumins/watt etc., complete. a)
LUMINAIRE MAKE : PHILLIPS / WIPRO /G.E. b) LED MAKE :
PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SEOUL SEMI CONDUCTORS / SAMSUNG.

Supply and Transportation of 18W Down lighter Recessed / Surface mounting made of diecast alluminium
body with powder coating acrylic diffuser Constant current out put of Driver operating voltage range of
150 to 265 Volts AC, Power factor > 0.9 high power 9 Nos of 2W LED 1 watt having efficacy of > 90
lumins/watt etc., complete. a) LUMINAIRE MAKE : MIC / BLU / BAJAJ / CROMPTON GREAVES / SURYA
/ ONIDA / FORTUNE ART / AVNI / SEMTRONICS / VIN
LED. b) LED MAKE : PHILIPS LUMILEDS /
CREE / NICHIA / OSRAM / SEOUL SEMI CONDUCTORS / SAMSUNG.

Supply and transportation of 18W, 1600 lumins, 1200mm length LED retrofit tube light, input
voltage AC 220 - 260 Volts with >0.9 PF with inbuilt driver and frosted cover etc complete. Makes:Phillips
/ GE / Crompton / VIN / Bajaj.
Supply and transportation of 18W 1200mm length, 1600 lumins, LED retrofit tubelight,input voltage AC
220 - 260 Volts with >0.9 PF with driver and frosted cover etc complete.Makes:Surya / MIC / BLU / KRIPA
Lights / Fortune Art / SEMTRONICS / Pierlite.
Supply and transportation of 18W, 1700 lumins, 1200mm length, T5 LED tube light fitting, input voltage
AC 220 - 260 Volts with >0.9 PF with driver and frosted cover etc complete. Makes:Phillips / GE /
Crompton / VIN / Bajaj.
Supply and transportation of 18W, 1700 lumins, 1200mm length, T5 LED tube light fitting, input voltage
AC 220 - 260 Volts with >0.9 PF with driver and frosted cover etc complete. Makes:Surya / MIC /
BLU / KRIPA Lights/Fortune Art / SEMTRONICS / Pierlite.
Supply and Transportation of 36W Recessed / Surface slim LED panel of 600mm x 600mm made of
alluminium body with acrylic diffuser, Constant current out put of Driver operating voltage range of 150 to
265 Volts AC, Power factor > 0.9 high power LEDs having efficacy of > 90 lumins/watt, junction
temparature less than 85 degrees centigrade and THD is less than 12% etc complete. a) LUMINAIRE
MAKE : Phillips / GE / Crompton/ VIN / Bajaj / Havells. b) LED MAKE : PHILIPS LUMILEDS / CREE /
NICHIA / OSRAM / SAMSUNG.

Supply and Transportation of 36W Recessed /Surface slim LED panel of 600mm x 600mm made of
alluminium body with acrylic diffuser, Constant current out put of Driver operating voltage range of 150 to
265 Volts AC, Power factor > 0.9 high power LEDs having efficacy of > 90 lumins/watt, junction
temparature less than 85 degrees centigrade and THD is less than 12% etc complete.a) LUMINAIRE
MAKE : Surya /MIC /BLU/KRIPA Lights / Fortune Art /SEMTRONICS /Pierlite. b) LED MAKE :PHILIPS
LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.

Supply and Transportation of 36W Recessed / Surface


mounting 2' x 2' LED luminaire made of extruded alluminium
body with acrylic diffuser, Constant current out put of Driver
operating voltage range of 150 to 265 Volts AC, Power factor >
0.9 high power LEDs having efficacy of > 90 lumins/watt,
junction temparature less than 85 degrees centigrade and THD
is
less
than
12%
etc
complete.
a) LUMINAIRE MAKE : Phillips / GE / Crompton / VIN / Bajaj /
Havells.
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM /
SAMSUNG.
Supply and Transportation of 36W Recessed / Surface
mounting 2' x 2' LED luminaire made of extruded alluminium
body with acrylic diffuser, Constant current out put of Driver
operating voltage range of 150 to 265 Volts AC, Power factor >
0.9 high power LEDs having efficacy of > 90 lumins/watt,
junction temparature less than 85 degrees centigrade and THD
is less than 12% etc complete.a) LUMINAIRE MAKE : Surya /
MIC / BLU / KRIPA Lights / Fortune Art / SEMTRONICS /
Pierlite.b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /
OSRAM / SAMSUNG.
Supply and Transportation of 36W Recessed /Surface mounting 2'x2' LED luminaire made of pressure
diecast alluminium housing body with extended heat sink and moulded diffuser, high effeiciency and low
power loss driver, Power factor > 0.9 high power LEDs having efficacy of > 100 lumins/watt, rated life of
50000 hours etc complete GE make Mapple series or its equivalent. a) LUMINAIRE MAKE : Phillips /
GE / Crompton / VIN / Bajaj / Havells. b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM
/ SAMSUNG.

Supply and transportation of 6W to 9W LED Drivers


Supply and transportation of 12W to 18W LED Drivers
LED TYPE STREET LIGHTS
Supply and transportation of 18W to 20W street light luminaire made of pressure diecast alluminium body
with powder coated, having toughned glass cover input voltage range of 100 to 270 volts AC, power
factor > 0.90, high power LED's having efficacy 100 lumines/watt and junction temprature < 85 degree
centegrade of IP 65 with optics, total hormonic destortion less than 15% at 110 Volts AC, driver
efficiency >90% etc., complete.a) LUMINAIRE MAKE : Phillips / GE / Crompton / VIN / Bajaj.b) LED
MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG.

20W
30W
60W
90W

120W
180W
210W
240W
270W
Supply and transportation of 18W to 20W street light luminaire made of pressure diecast alluminium
body with powder coated,having toughned glass cover input voltage range of100 to 270 volts AC, power
factor > 0.90, high power LED's having efficacy 100 lumines/watt and junction temprature < 85 degree
centegrade of IP 65 with optics, total hormonic destortion less than15% at 110 Volts AC,driver
efficiency >90% etc., complete. a) LUMINAIRE MAKE :Surya /MIC / BLU/ KRIPA Lights/ Fortune Art /
SEMTRONICS / Pierlite. b) LED MAKE : PHILIPS LUMILEDS / CREE/ NICHIA / OSRAM/SAMSUNG.

20W
30W
60W
90W
INDUCTION LUMINARIES
Supply and Transportation of Induction Type street light luminaire of following capacities comprises
of single piece die cast Aluminium body with pot optics and IP65 protection including Induction
lamp and ballast etc., Complete. Make:Crompton / Bajaj / Fortune Art / Synergy Solutions / BillionLight

40W
80W
120W
150W
200W
Supply and Transportation of Induction Type Flood light luminaire of following capacities comprises
of single piece die cast Aluminium body with pot optics and IP65 protection of including Induction
lamp and ballast etc., Complete. Make:Crompton / Bajaj / Fortune Art / Synergy Solutions / BillionLight

40W
80W
120W

150W
200W
Supply and Transportation of Induction Type Flood light luminaire of following capacities comprises of
single piece die
cast Aluminium body and IP65 protection of including Induction lamp and ballast etc.,Complete. Make:
Crompton /
Bajaj / Phillips / Surya / LVD RAES.
40W
80W
120W
150W
200W
2 x 200W
Supply and Transportation of Induction Type Flood light luminaire of following capacities comprises of
single piece die
cast Aluminium body and IP65 protection of including Induction lamp and ballast etc.,Complete. Make:
Crompton /
Bajaj / Phillips / Surya / LVD RAES.
40W
80W
120W
150W
200W
2 x 200W
Supply and Transportation of Induction Type suspended type decorative high bay luminaire with
polycarbonate refractor, decorative integral die cast alluminium housing with heat shrinks including
Induction lamp and ballast etc., Complete. Make: Crompton / Bajaj / Phillips / Surya / LVD RAES.

80W
120W
150W
Supply and Transportation of Induction Type suspended type decorative high bay luminaire with
polycarbonate refractor, decorative integral die cast alluminium housing with heat shrinks including
Induction lamp and ballast etc., Complete. Make: Crompton / Bajaj / Phillips / Surya / LVD RAES.

80W
120W

150W
SECTION - 4
U.G. CABLES
Supply of 4 Sqmm 2 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.

Supply of 4 Sqmm 2 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / V-Guard / Fortune
Art / Gloster/ Suncab
Supply of 4 Sqmm 2 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) of makes Finecab / Delton / Payal / Gemscab / SPM.

Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Torrent /
Universal / CCI / KEI / Unicab.

Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Polycab / RPG /
Finolex / Havells / Paragon / V-Guard / Fortune Art / Gloster/ Suncab.

Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes
Delton / Payal / Gemscab / SPM.

Finecab /

Supply of 10 Sqmm 2 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Torrent /
Universal / CCI / KEI / Unicab.
Supply of 10 Sqmm 2 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Polycab / RPG /
Finolex / Havells / Paragon / V-Guard / Fortune Art / Gloster/ Suncab.

Supply of 10 Sqmm 2 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes
Delton / Payal / Gemscab / SPM.

Finecab /

Supply of 6 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.

Supply of 6 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / V-Guard / Fortune
Art / Gloster/ Suncab.
Supply of 6 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) of makes Finecab / Delton / Payal / Gemscab / SPM.

Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification
confirming to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.

Supply of 10 Sqmm
4 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / VGuard / Fortune Art / Gloster/ Suncab.

Supply of 10 Sqmm 4 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes
Delton / Payal / Gemscab / SPM.

Finecab /

Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Torrent /
Universal / CCI / KEI / Unicab.
Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Polycab / RPG /
Finolex / Havells / Paragon / V-Guard / Fortune Art / Gloster/ Suncab.

Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) of makes Finecab / Delton / Payal / Gemscab / SPM.
Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Torrent /
Universal / CCI / KEI / Unicab.
Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Polycab / RPG /
Finolex / Havells / Paragon / V-Guard / Fortune Art / Gloster/ Suncab.

Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) of makes Finecab / Delton / Payal / Gemscab / SPM.
Supply of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.
Supply of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Polycab / RPG /
Finolex / Havells / Paragon / V-Guard / Fortune Art / Gloster/ Suncab.

Supply of 35 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Finecab / Delton / Payal / Gemscab / SPM.

Supply of 50 Sqmm 3.5 Core.XLPE PVC armoured alluminium cable of makes Torrent / Nicco / Universal /
CCI / Fortune Art
Supply of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Polycab / RPG /Finolex/ Havells / Paragon / VGuard / Fortune Art / Gloster/ Suncab.

Supply of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Finecab / Delton /Payal /Gemscab / SPM.

Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Torrent / Universal /CCI / KEI / Unicab.

Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming
to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / V-Guard / Fortune Art /
Gloster/ Suncab.
Supply of 70 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Finecab / Delton / Payal / Gemscab / SPM.

Supply of 95 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.

Supply of 95 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming
to IS:7098 (Part - I) of makes Polycab /RPG / Finolex / Havells / Paragon / V-Guard / Fortune Art / Gloster/
Suncab.
Supply of 95 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Finecab / Delton / Payal / Gemscab / SPM.

Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.

Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / VGuard / Fortune Art / Gloster/ Suncab.

Supply of 120 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Finecab / Delton / Payal / Gemscab / SPM.

Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.

Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / VGuard / Fortune Art / Gloster/ Suncab.

Supply of 150 Sqmm 3.5 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Finecab /
Delton / Payal.

Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade


armoured alluminium cable as per specification confirming
to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.
Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / VGuard / Fortune Art / Gloster.
Supply of 240 Sqmm 3.5 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Torrent /
Universal / CCI / KEI / Unicab.
Supply of 240 Sqmm 3.5 Core XLPE insulated, 1100V grade
armoured alluminium cable as per specification confirming to IS:7098 (Part - I) of makes Polycab / RPG /
Finolex / Havells / Paragon / V-Guard / Fortune Art / Gloster.

Supply of 300 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.

Supply of 300 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / VGuard / Fortune Art / Gloster.

Supply of 400 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Torrent / Universal / CCI / KEI / Unicab.

Supply of 400 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per
specification confirming to IS:7098 (Part - I) of makes Polycab / RPG / Finolex / Havells / Paragon / VGuard / Fortune Art / Gloster.

11 KV H.T. XLPE CABLES


Supply of 3 Core 11 KV 35 Sqmm HT XLPE (E) armoured
Cable, as per IS specification confirming to IS 7098/II/85 with latest ammendments. Makes Torrent /
Universal / CCI
/ Polycab / KEI / Unicab.
Supply of 3 Core 11 KV 50 Sqmm HT XLPE (E) armoured
Cable, as per IS specification confirming to IS 7098/II/85 with latest ammendments.Makes Torrent /
Universal / CCI / Polycab / KEI / Unicab.
Supply of 3 Core 11 KV 70 Sqmm HT XLPE (E) armoured
Cable, as per IS specification confirming to IS 7098/II/85 with latest ammendments.Makes Torrent /
Universal / CCI / Polycab / KEI / Unicab.
Supply of 3 Core 11 KV 95 Sqmm HT XLPE (E) armoured Cable, as per IS specification confirming to IS
7098/II/85 with latest ammendments.Makes Torrent / Universal / CCI / Polycab / KEI / Unicab.

Supply of 3 Core 11 KV 120 Sqmm HT XLPE (E) armoured Cable, as per IS specification confirming to IS
7098/II/85 with latest ammendments.Makes Torrent / Universal / CCI / Polycab / KEI / Unicab.

Supply of 3 Core 11 KV 150 Sqmm HT XLPE (E) armoured Cable, as per IS specification confirming to IS
7098/II/85 with latest ammendments.Makes Torrent / Universal / CCI / Polycab / KEI / Unicab.

Supply of 3 Core 11 KV 185 Sqmm HT XLPE (E) armoured


Cable, as per IS specification confirming to IS 7098/II/85
with latest ammendments.Makes Torrent / Universal / CCI / Polycab / KEI / Unicab.

CABLE GLANDS
Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for
185Sqmm with brass washers complete.
Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for
240Sqmm with brass washers complete.
Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for
300Sqmm with brass washers complete.
Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable for
400Sqmm with brass washers complete.
Supply and Fixing of single compression brass cable glands for 4 core XLPE armoured cable up to 16.0
Sq.mm with brass washers complete.
Supply and Fixing of single compression brass cable glands for 3.5 core XLPE armoured cable from 25
Sqmm to 50.0
Sq.mm with brass washers complete.
Supply and Fixing of Single compression brass cable glands for 3.5 core XLPE armoured cable from 70
Sqmm to 150.0 Sq.mm with brass washers complete.

LUGS
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable upto 16
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 25
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 35
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 50
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 70
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 95
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 120
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 150
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 185
including nuts and bolts with connections.

Sq.mm
Sq.mm
Sq.mm
Sq.mm
Sq.mm
Sq.mm
Sq.mm
Sq.mm
Sq.mm

Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 240 Sq.mm
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 300 Sq.mm
including nuts and bolts with connections.
Supply and fixing of crimping type copper lugs confirming to I.S specifications for cable of 400 Sq.mm
including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable upto
16 Sq.mm including nuts and bolts with connections.

Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of
25 Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of
35 Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of
50 Sq.mm including nuts and bolts with connections.

Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of 70
Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of
95 Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugsconfirming to I.S specifications for cable of
120 Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of 150
Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of
185 Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of
240 Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of 300
Sq.mm including nuts and bolts with connections.
Supply and fixing of crimping type aluminium lugs confirming to I.S specifications for cable of
400 Sq.mm including nuts and bolts with connections.
CABLE JOINTS
HEAT SHRINKABLE LT CABLE JOINTS
Supply of heat shrinkable straight through joint Indoor / Out door for L.T. XLPE Armoured 1100V grade
cable complete with necessary accessories and suitable clamps including cost and conveyance of
materials complete for 10 to 16 Sqmm. Makes Raychem / M Seal / Denson / Multy.
Supply of heat shrinkable straight through joint Indoor / Out door for L.T. XLPE Armoured 1100V grade
cable complete with necessary accessories and suitable clamps including cost and conveyance of
materials complete for 25 to 50 Sqmm. Makes Raychem / M Seal / Denson / Multy.
Supply of heat shrinkable straight through joint Indoor /Out door for L.T. XLPE Armoured 1100V grade
cable complete with necessary accessories and suitable clamps including cost and conveyance of
materials complete for 70 to 185 Sqmm. Makes Raychem/ M Seal /Denson /Multy.
Supply and errecting heat shrinkable straight through joint Indoor / Out door for L.T. XLPE Armoured
1100V grade cable complete with necessary accessories and suitable clamps including cost and
conveyance of materials and all labour charges etc., complete for 240 to 300 Sqmm. Makes Raychem /
M Seal / Denson / Multy.
Supply of heat shrinkable straight through joint Indoor /Out door for L.T.XLPE Armoured 1100V grade
cable complete with necessary accessories and suitable clamps including cost and conveyance of
materials complete for 400 Sqmm. Makes Raychem / M Seal / Denson / Multy.
3 CORE 11 KV HT CABLE STRAIGHT THROUGH JOINTS
Providing and erecting heat shrinkable straight through joint out door / indoor for H.T, XLPE Insulated
armoured cable 11000V grade complete with necessary accessories and suitable clamps duly erected
and connected to the supply for the following
multi core cables including cost and conveyance of
Providing
andallerecting
shrinkable
straightforthrough
joint out door / indoor
for H.T,
XLPE/ Insulated
materials and
labour heat
charges
etc., complete
16 to 35Sqmm.Makes
Raychem
/ M Seal
Denson /
armoured
cable 11000V grade complete with necessary accessories and suitable clamps duly erected
Multy.
and connected to the supply for the following
multi core cables including cost and conveyance of
materials and all labour charges etc., complete for 50 to 95Sqmm.Makes Raychem / M Seal / Denson /
Providing and erecting heat shrinkable straight through joint out door / indoor for H.T, XLPE Insulated
Multy.
armoured cable 11000V grade complete with necessary accessories and suitable clamps duly erected
and connected to the supply for the following
multi core cables including cost and conveyance of
materials and all
labour charges etc., complete for 120 to 185Sqmm.Makes Raychem / M Seal /
Denson / Multy.

HT END TERMINATION KITS


Providing and errecting heat shrinkable indoor termination kit for 11 KV XLPE HT cable 3 core 70 Sqmm
with necessary materials etc., complete.Makes Raychem / M Seal / Denson / Multy.
Providing and errecting heat shrinkable indoor termination kit for 11 KV XLPE HT cable 3 core 120
Sqmm with necessary materials etc., complete.Makes Raychem / M Seal/ Denson / Multy.
Providing and errecting heat shrinkable indoor termination kit for 11 KV XLPE HT cable 3 core 150
Sqmm with necessary materials etc., complete.Makes Raychem / M Seal / Denson / Multy.
Providing
and
errecting
heat
shrinkable
outdoor termination kit for 11 KV XLPE HT cable 3
core 70 Sqmm with necessary materials etc., complete.Makes Raychem / M Seal / Denson / Multy.
Providing and errecting heat shrinkable outdoor termination kit for 11 KV XLPE HT cable 3 core 120
Sqmm with necessary materials etc., complete.Makes Raychem / M Seal / Denson / Multy.
Providing and errecting heat shrinkable outdoor termination kit for 11 KV XLPE HT cable 3 core 150
Sqmm with necessary materials etc., complete.Makes Raychem.
DOUBLE WALLED CORRUGATED HDPE PIPE
Supply and Transportation of Outer dia 50mm and Inner dia 38mm double walled corrugated HDPE duct
made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
Supply and Transportation of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct
equivalent make.
made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
Supply and Transportation of Outer dia 78mm and Inner dia 63mm double walled corrugated HDPE duct
equivalent make.
made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
Supply and Transportation of Outer dia 90mm and Inner dia 76mm double walled corrugated HDPE duct
equivalent make.
made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
Supply and Transportation of Outer dia 120mm and Inner dia 103.50mm double walled corrugated HDPE
equivalent make.
duct made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
Supply and Transportation of Outer dia 160mm and Inner dia 136mm double walled corrugated HDPE
equivalent make.
duct made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
Supply and Transportation of Outer dia 180mm and Inner dia 152mm double walled corrugated HDPE
equivalent make.
duct made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
Supply and Transportation of Outer dia 200mm and Inner dia 170mm double walled corrugated HDPE
equivalent make.
duct made as per specification BSEN - 500 86/IS 14930 Part-II. Makes:DURA LINE (Dura Guard) or its
CABLE TRAYS
equivalent make.
Supply and Installation of 600mm x 75mm x 2mm thick hot dip GI perforated cable tray with cover along
with required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray should
Supply and Installation of 600mm x 50mm x 2mm thick GI perforated cable tray with cover along with
be fitted on the wall / Ceiling etc. complete.
required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray should be
Supply and Installation of 450mm x 50mm x 2mm thick GI perforated cable tray with cover along with
fitted on the wall / Ceiling etc. complete.
required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray should be
Supply and Installation of 300mm x 50mm x 2mm thick GI perforated cable tray with cover along with
fitted on the wall / Ceiling etc. complete.
required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray should be
Supply and Installation of 150mm x 50mm x 2mm thick GI perforated cable tray with cover
fitted on the wall / Ceiling etc. complete.
along with required angle supports, with coupler plates, Anchor bolts and nuts etc complete
and the tray should be fitted on the wall / Ceiling etc. complete.
Supply and Installation of 150mm x 50mm x 2mm thick GI Ladder type cable tray along with
required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray
should be fitted on the wall / Ceiling etc. complete.
Supply and Installation of 300mm x 50mm x 2mm thick GI Ladder type cable tray along with
required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray
should be fitted on the wall / Ceiling etc. complete.
Supply and Installation of 600mm x 75mm x 2mm thick GI Ladder type cable tray along with
required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray
should be fitted on the wall / Ceiling etc. complete.
Note: Perforated cable trays provided without cover 30% may be deducted from above rates.
SECTION - 5

FANS
Supply of 48" (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball
bearings but without Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom

Supply of 48" (1200mm) Sweep as per IS 374 - 1979 and 5 Star rated Ceiling Fan, with double ball
bearings but without Regulator of makes Crompton High Speed Plus / Bajaj Electra 50 / Orient Energy
Star / Havells ES 50.

Supply of 48" (1200mm) Sweep 5 Star rated Ceiling Fan without Regulator of makes Crompton High
Speed Decora / Bajaj Regal star / Havells Fusion 50 / Orient Summer Crown / Usha technix decorative

Supply of 56" (1400mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings
but without Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom
Supply of 56" (1400mm) Sweep 4/5 Star rated Ceiling Fan without Regulator of makes Crompton / Bajaj
Elegance Star / Usha / Havells.
Supply of 16" (400mm) Wall mounted Fan of makes Crompton SDX Gold
Swing Premia gold / Usha / Orient Wall 43.

/ Bajaj Elite

/ Havells

Supply of 16" (400mm) Pedestal Fan of makes Crompton SDX Gold / Bajaj Spectrum / Havells Swing
Remote / Usha / Orient.
Supply of 18" (450mm) Wall mounting / Pedestal Air Circulators of makes Crompton
Turbo Force / Orient / Almounard.

/ Havells

Supply of 24" (600mm) Wall mounting / Pedestal Air Circulators of makes Crompton
Turbo Force / Almounard.

/ Havells

Supply of 12" (300mm) Cabin fan of makes Crompton / Havells ciera / Orient AP12.

Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete of makes Crompton / Bajaj
Bahar WG / Havells Ventil Air-DB / Orient hill air.
Supply of 9" (225mm), Light duty exhaust fan with double ball bearing and wire guard etc complete of
makes Crompton / Bajaj Bahar WG / Havells Ventil Air-DS / Orient hill air.
Supply of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark of makes
Crompton / Almounard / Havells Turbo Force.
Supply of 15" (375mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark of makes
Crompton / Almounard / Havells Turbo Force

Supply of 18" (450mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark of makes
Crompton / Almounard / Havells Turbo Force
WATER HEATERS
Supply, Transportation and fixing of storage / Pressure type Vertical / Horizontal 230/250V single phase
2000watts ISI mark 5 Star rated water heater with SS tank and ABS plastic body of 15 Ltrs capacity to
withstand up to 6.5 bar of water pressure including all standard accessories and dead weight pressure
reducing valve on out let side, including cost of 2 Nos nylon / PVC / Metallic hose pipe, testing and all
Supply,
Transportation
and fixing
of storage /Crompton
Pressure model
type Vertical
/ Horizontal
230/250V
single1phase
labour charges
etc., complete.
Makes:makes
No. solarium
plus SWH
725, Class
rated
2000watts
ISI mark
5 of
Star
rated
water/ heater
SS tank and ABS plastic body of 25 Ltrs capacity to
or its equivalent
make
Bajaj
/ Venus
Racold with
/ Usha.
withstand up to 6.5 bar of water pressure including all standard accessories and dead weight pressure
reducing valve on out let side, including cost of 2 Nos nylon / PVC / Metallic hose pipe, testing and all
ACCESSORIES
FORcomplete.
WATER HEATERS
labour
charges etc.,
Makes:makes Crompton model No. solarium plus SWH 725, Class 1 rated
or its equivalent make of Bajaj / Venus / Racold / Usha.
Heating element of 1.5 / 2.0 / 3.0 KW.
Supply of thermostat with range 300 to 900C.Adjustable and suitable for 25 to 50 Ltrs. Capacity.

Supply of pressure release valve for water heater of 15 to 50 Ltrs.capacity.

Flexible Nylon / PVC Metallic hose pipe

ACCESSORIES FOR MOTORS

Supply & Fixing of D.O.L Starter 250V, Single phase, 50Hz. With SS enclouser comprising of contactor
with bi-metalic relay with necessary push buttons, etc., complete.Makes:Siemens / Crompton / L&T.
Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. enclosed with no volt coil and overload
protection with necessary materials, etc., complete suitableupto 7.5.HP.Makes:Siemens / Crompton /
Motor Cover made with GI sheet of 18SWG for protection from rain complete.
L&T.
Supply & Fixing of D.O.L Starter 415V, 3 phase, 50Hz.. enclosed with no volt coil, overload
protection and single phase preventor , etc., complete suitable upto 10.0.HP. Makes:Siemens /
SINGLE PHASE SUBMERSIBLE MOTOR PUMP SETS
Crompton / L&T.
Supply and Transportation of 0.75HP 8 Stage single phase ISI submersible motor pumpset suitable for 4"
Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

Supply and Transportation of 0.75HP 8 Stage single phase ISI submersible motor pumpset suitable for 4"
Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

Supply and Transportation of 1.00HP 10 Stage single phase ISI submersible motor pumpset suitable for
4" Bore well.
Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.50HP 10 Stage single phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.00HP 15 Stage single phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

Supply and Transportation of 1.00HP 15 Stage single phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

Supply and Transportation of 1.00HP 15 Stage single phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.00HP 15 Stage single phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.00HP 15 Stage single phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.00HP 15 Stage single phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

THREE PHASE SUBMERSIBLE MOTOR PUMP SETS.


Supply and Transportation of 3.00HP 20-23 Stage Three phase ISI submersible motor pumpset suitable
for 4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 3.00HP 20-23 Stage Three phase ISI submersible motor pumpset suitable
for 4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 3.00HP 30-33 Stage Three phase ISI submersible motor pumpset suitable
for 4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 3.00HP 30-33 Stage Three phase ISI submersible motor pumpset suitable
for 4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 5.00HP 30-35 Stage Three phase ISI submersible motor pumpset suitable
for 4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 5.00HP 30-35 Stage Three phase ISI submersible motor pumpset suitable
for 4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 5.00HP 40 Stage Three phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 5.00HP 50 Stage Three phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 5.00HP 50 Stage Three phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 5.00HP 50 Stage Three phase ISI submersible motor pumpset suitable for
4" Bore well. Makes: Aryan varsha/Flowell/Waterman
SINGLE PHASE OPEN WELL SUBMERSIBLE MOTOR PUMP SETS.
Supply and Transportation of 1.00HP Single phase open well ISI submersible motor pumpset. Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

Supply and Transportation of 1.00HP Single phase open well ISI submersible motor pumpset. Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

Supply and Transportation of 1.50HP Single phase open well ISI submersible motor pumpset. Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

Supply and Transportation of 1.50HP Single phase open well ISI submersible motor pumpset. Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 3.00HP Single phase open well ISI submersible motor pumpset. Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 3.00HP Single phase open well ISI submersible motor pumpset. Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

THREE PHASE OPEN WELL SUBMERSIBLE PUMP SETS.


Supply and Transportation of 3.00HP Three phase open well ISI
(65x50) Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

submersible

motor

pumpset.

Supply and Transportation of 3.00HP Three phase open well ISI


(65x50) Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

submersible

motor

pumpset.

Supply and Transportation of 5.00HP Three phase open well ISI


(75x65) Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 5.00HP Three phase open well ISI
(75x65) Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

submersible

motor

pumpset.

submersible

motor

pumpset.

Supply and Transportation of 7.50HP Three phase open well ISI


(100x75) Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

submersible

motor

pumpset.

Supply and Transportation of 7.50HP Three phase open well ISI


(100x75) Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.

submersible

motor

pumpset.

Supply and Transportation of 10.00HP Three phase open well ISI


(100x75) Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 10.00HP Three phase open well ISI
(100x75) Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
SINGLE PHASE MONO BLOCK MOTOR PUMP SETS.

submersible

motor

pumpset.

submersible

motor

pumpset.

Supply and Transportation of 0.5HP Single phase ISI Mono block motor pumpset (25x25mm).
Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 0.5HP Single phase ISI Mono block motor pumpset (25x25mm).
Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.0HP Single phase ISI Mono block motor pumpset (25x25mm). Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.0HP Single phase ISI Mono block motor pumpset (25x25mm). Makes:
Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.5HP Single phase ISI Mono block
Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.5HP Single phase ISI Mono block
Makes: Aryan varsha / Flowell/ Waterman

motor

pumpset

(32x25mm).

motor

pumpset

(32x25mm).

Supply and Transportation of 1.02HP Single phase ISI self priming Mono block IP44 motor pumpset
(40x40mm). Makes: Kirloskar / Crompton / CRI / L&T / Texmo / Varsha.
Supply and Transportation of 1.02HP Single phase ISI self priming Mono block IP44 motor pumpset
(40x40mm). Makes: Aryan varsha / Flowell/ Waterman
Supply and Transportation of 2.00HP Three phase ISI self priming Mono block IP44 motor pumpset
(40x40mm). Makes: Kirloskar / Crompton / CRI / Texmo / CRL / KSB

Supply and Transportation of 2.00HP Three phase ISI self priming Mono block IP44 motor pumpset
(40x40mm). Makes: Aryan varsha / Flowell/ Waterman
Supply and Transportation of 3.00HP Three phase ISI self priming Mono block IP44 motor pumpset
(50x50mm).
Kirloskarof/ Crompton
/ CRI /phase
TexmoISI
/ CRL
KSB
Supply and Makes:
Transportation
3.00HP Three
self/ priming
Mono block IP44 motor pumpset
(50x50mm). Makes: Aryan varsha / Flowell/ Waterman
Supply and Transportation of 5.00HP Three phase ISI self priming Mono block IP44 motor pumpset
(80x80mm). Makes: Kirloskar / Crompton / CRI / Texmo / CRL / KSB
Supply and Transportation of 5.00HP Three phase ISI self priming Mono block IP44 motor pumpset
(80x80mm). Makes:Aryan varsha / Flowell/ Waterman
CONTROL PANEL BOARD FOR MOTORS

Supply and Transportation of control panel for single phase submersible motors up to 3 HP @ 220V 50Hz
operating range between 80 to 240V including supply and fixing of Direct - on - Line LTLK / SIEMENS /
CROMPTON make Volt meter and Ammeter with starting and running capacitors assembled with ISI
mark contactors and fitted with Legrand make ISI mark MCB etc., complete.
REPAIRS TO AIR CONDITIONERS

Supply, Fabrication of 1set MS bracket suitable for fixing out door unit of split AC unit.
Providing 2 runs of Copper tubes for suction and discharge between indoor and outdoor unit for split AirConditioner including foaming etc., complete.
Supply of 1.0 / 1.5 Ton brand new Rotary type sealed compressor.
Supply of 2.0 Ton brand new Rotary type sealed compressor.
Multi speed Fan Motor suitable for 1.0 / 1.5 / 2.0 Ton Window A.C.Unit of makes Crompton / AU.
Fan motor capacitor 6 mfd

by new capacitor for A.C machine of 1.0 1.5 / Ton Capacity.

Thermostat switch suitable for 1.0 / 1.5 / 2.0 Ton A.C.Unit.


Starting capacitor of 80 to 120 mfd. by new approved make capacitor suitable for compressor motor of 1.0
/ 1.5 Ton A.C. Unit.
Running capacitor of 36 mfd by new approved make capacitor suitable for compressor motor of 1.0 / 1.5
Ton A.C.Unit.
Relay by approved make having pickup voltage 220 Volts and dropout voltage 120 Volts suitable for 1.0 /
1.50 Ton A.C. Unit.
Filter and capillary tube including welding etc., complete for 1.0 / 1.5 / 2.0 Ton A.C.Unit.

Air filter suitable for 1.50 Ton Window A.C.Unit P.V.C./ NYLON.

Air filter suitable for 1.50 Ton Split A.C.Unit P.V.C. / NYLON.
Rewiring the entire Window type 1.50 Ton A.C.unit with 2.5 Sq.mm Flexible copper cable and putting
the same in working conditions.

Overhauling and servicing the Window type 1.0 / 1.5 Ton A.C. Machine by Cleaning the condensor cooling
Coil etc., by blower and oiling the Fan Motor and Cleaning all parts and putting the machine in working
condition.
Fan blade for 1.0 / 1.5 Ton A.C.Machine.

Grill of 1.0 / 1.5 ton A.C. Machine (for assembled Units).

Grill of 1.0 / 1.5 ton A.C. Machine of branded units.

Rotary / Selector switch by new one.


Flushing the line, leak testing, leak stopping, vaccumming, dehydrating and charging the gas in the
refrigeration system for 1.0/ 1.5 /2.0 Ton Window A.C.Unit.

Flushing the line, leak testing, leak stopping, vaccumming, dehydrating and charging the gas in the
refrigeration system for 1.5 /2.0 Ton Split A.C.Unit.
Spray painting of Refrigerator using good quality paint after scraping the surface etc.
New sealed compressor of 1/8 HP suitable for 165 to 185 Ltrs. Capacity Refrigerator.
Sealed compressor of 1/6 HP suitable for 285 / 310 Ltrs. Capacity Refrigerator.
Supply of fan motor by new 1/10 t0 1/12 H.P 1250 RPM fan motor for Water Cooler of 80-150 Ltrs.
Bush for fan motor of 80-150 Lts.
Resistance type regulator for ceiling fans 900/1200/1400mm sweep complete erected on existing
board.
Installation of 1.5 / 2.0 TR Split Air Conditioners.
Removing of existing 1.5 / 2.0 TR Split Air Conditioners without damaging to copper pipe.
Installation of 1.5 / 2.0 / 3.0 TR Cassette type Split Air Conditioners.
Installation of 1.5 / 2.0 / 3.0 TR Tower

type Split Air Conditioners.

Supply,Fabrication of 1set MS bracket suitable for fixing out door unit of Casseete AC unit.
Providing 2 runs of Copper tubes for suction and liquid between indoor and outdoor unit for
split/Casseete Air- Conditione foaming etc., complete. 1.7/8" x 1/2"
Providing 2 runs of Copper tubes for suction and liquid between indoor and outdoor unit for split /
Casseete Air- Conditioner including foaming etc., complete. 1. 1 1/8" x 5/8"
AIR CONDITIONERS
Supply of split AC unit with high wall mounted indoor unit and outdoor condencing unit Hermetically
sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing
cooling dehumidifying air circulating and filtering with cooling and condensing units with 5mts of
1.5 TR Split
required
size ACs
of copper piping duly insulated and 3 core copper flexible chord of required length
and
cordless
remote
control
1.5 TR 3 Star
capable
of delivering 18000 BTU/hr and above with operating on refrigerant R-22
makes Mitsubishi SRK 19 CK-6
1.5 TR 3 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-22
makes Daikin FTE-M or N Sereis / Carrier Novello / Blue Star 3HW18VB1 / Hitachi (Kazi+) / Voltas
183 PX-R.
1.5TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-22
makes Mitsubishi SRK20CKS-6 / Hitachi ACE FMS
1.5TR 5 Star capable of delivering 18000 BTU/hr and above with
410A makes Daikin FT-M / Carrier Estrella / Blue Star 5HW18DBF1.

operating on refrigerant R-

1.8TR-2.1TR Split ACs


1.8 / 2.0 TR 3 Star capable of delivering 21600 BTU/hr and above with operating on refrigerant R-22
makes Carrier Dura edgeplus / Daikin FTE-M or N Series / Blue Star 3HW24SVB1
2.0 TR 4 Star capable of delivering 21600 BTU/hr and above with operating on refrigerant R-22
makes 'O' General.
2.0 TR 4 Star capable of delivering 21600 BTU/hr and above with operating on refrigerant R-22
makes Carrier Kurve.
1.8 / 2.0 TR 5 Star capable of delivering 21600 BTU/hr and above with operating on refrigerant
R-22 makes Mitsubishi SRK25CKS-6 / Daikin FT-M Series
Inverter Split AC Unts (Cooling Only)
Supply of INVERTER Model Cool type split AC unit with high wall mounted Single Split indoor unit
and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz,
1.5 TR
capable of delivering 18000 BTU/hr and above with operating on refrigerant R-410
1Phase AC supply capable of performing Heat cool dehumidi -fying air circulating and filtering with
makes O General model No. ASGA18JCC / Toshibha Model No. RAS-18N3KCV-IN
cooling
condensing
units duly
insulated
core copper
flexible on
chord
of required
1.5
TR and
capable
of delivering
18000
BTU/hrand
and3 above
with operating
refrigerant
R-410 length
makes
etc. complete
cordless remote
'Daikin
Model including
No.FTKS50FVMA
/ Mitsubishi Model No. SRK18YL-S / Blue Star Model No.
HNHW18CBF.

1.8 TR capable of delivering 21600 BTU/hr and above with operating on refrigerant R-410 makes
Thosibha Model No. RAS-22N3KCV-IN / Daikin Model No. FTKS60FVMA
2.0 TR capable of delivering 24000 BTU/hr and above with operating on refrigerant R-410 makes
'O' General Model No. ASGA24JCC / Blue Star Model No. HNHW22CBF
CASSETTE TYPE AC UNITS
Supply of Cassette type AC unit with ceiling mounted indoor unit and outdoor condencing unit
Hermetically sealed compressor suitable for operation on AC supply capable of performing cooling
Single Phase Makes: 2.2TR Daikin / 2.0TR 'O' Genral AUG25AB
dehumidifying air circulating and filtering with cooling and condensing units etc complete with
Wireless remote controller, but without refrigerent piping and cable.
3.0TR Three Phase capable of delivering 36000 BTU/hr and above with operating on refrigerant
R-22 makes Makes: 'O' Genral
3.0TR Three Phase capable of delivering 36000 BTU/hr and
above with operating on refrigerant R-22 Makes: Daikin /
3.5TR Three Phase capable of delivering 42000 BTU/hr and above with operating on refrigerant RCarrier / Blue Star.
22 Makes: 'O' General
3.5TR Three Phase capable of delivering 42000 BTU/hr and above with operating on refrigerant R-22
Makes: Daikin
3.5TR Three Phase Makes: Carrier / Blue Star
4.0TR Three Phase capable of delivering 48000 BTU/hr and above with operating on refrigerant R-22
Makes: Daikin / 'O' Genral
4.0TR Three Phase capable of delivering 48000 BTU/hr and above with operating on refrigerant R-22
Makes: Carrier / Blue Star
3.0TR Three Phase capable of delivering 36000 BTU/hr and above with operating on refrigerant R-410
Makes:Carrier / Blue Star.
3.0TR Three Phase capable of delivering 36000 BTU/hr and above with operating on refrigerant R-410
Makes:Toshibha /
4.0TR Three Phase capable of delivering 48000 BTU/hr and above with operating on refrigerant R-410
O General (Inverter Technology)
Makes: Carrier /
4.0TR Three Phase capable of delivering 48000 BTU/hr and above with operating on refrigerant R-410
Blue Star
Makes:Toshibha / O General (Inverter Technology)
TOWER MODEL TYPE AC UNITS
Supply of Slim line / Tower Model/Verticool type split AC unit with indoor unit and floor mounted
outdoor condencing unit Hermetically sealed Scroll compressor suitable for operation on AC supply
3.0TR Three Phase capable of delivering 36000 BTU/hr and above with operating on refrigerant R-22
capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing
Makes: Voltas
units
etcThree
complete
with
cordless
remote control
3.5TR
Phase
capable
of delivering
42000 BTU/hr and above with operating on refrigerant R-22
Makes: Blue Star
INVERTOR MODEL HEAT COOL SINGLE SPLIT AC'S
Supply of INVERTER Model Heat Cool type split AC unit with high wall mounted Single Split indoor
unit
and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V,
......do....with Cooling capacity 18000 BTU/Hr and above, Coffeient of performance 3.70 and above
50Hz, 1Phase AC supply capable of performing Heat cool dehumidi -fying air circulating and filtering with
and R410A refrigerent etc complete. Make : Toshiba model No. Indoor Unit RAS-18N3KV2-E Outdoor
cooling and condensing
units duly
insulated
core Coffeient
copper flexible
chord of 3.40
required
etc.
.......do.....with
Cooling capacity
22000
BTU/Hr and
and 3above,
of performance
and length
above and
Unit RAS-18N3AV2-E or its equivalent model of 'O'General / Mitsubishi / Daikin
complete.
R410A refrigerent etc complete. Make : Toshiba model No. Indoor Unit RAS-B22N3KV2-E Outdoor Unit
STABILIZERS
RAS-22N3AV2-E or its equivalent model of 'O'General / Mitsubishi / Daikin
Supply of 0.5 KVA Stabilizer of make V-Guard / Real Guard / Uni Stab / ITL.
Supply of 0.5 KVA Stabilizer of make Keeline / Soft Line / Capri.
Supply of 1.0 KVA Stabilizer of make V-Guard / Real Guard / Uni Stab / ITL.
Supply of 1.0 KVA Stabilizer of make Keeline / Soft Line / Capri.
Supply of 3.0 KVA Stabilizer of make V-Guard / Real Guard / Uni Stab / ITL.
Supply of 3.0 KVA Stabilizer of make Keeline / Soft Line / Capri.
Supply of 4.0 KVA Stabilizer of make V-Guard / Real Guard / Uni Stab / ITL.
Supply of 4.0 KVA Stabilizer of make Keeline / Soft Line / Capri.
Supply of 5.0 KVA Stabilizer of make V-Guard / Real Guard / Uni Stab / ITL.
Supply of 5.0 KVA Stabilizer of make Keeline / Soft Line / Capri.

REPAIRS TO MOTORS AND REWINDING, BEARINGS


Bearing of approved make for electric motor single phase / 3 phase AC upto 1 HP of all types.
Bearing of approved make for electric motor single phase /3 phase AC upto 2 to 3 HP of all types.
Bearing of approved make for electric motor single phase /3 phase AC upto 5 to 7.5 HP of all types.
Bearing of approved make for electric motor single phase /3 phase AC upto 10 to 12.5 HP of all types.
Bearing of approved make for electic motor single phase / 3 phase AC upto 15 to 20 HP of all types.
Bearing of table / cabin / pedestal / ceiling / exhaust fan complete with alignment of shaft and tested.
Bearing of

bush / rubber / ring washers complete with alignment of shaft and tested.

Capacitor of table / cabin / pedestal / ceiling / exhaust fan complete.


EICHER model 11:10 with 100 H. P direct injestion 4 stroke engine with one spare wheel 3800 mm cabin
high deck with jangla (full body) (4 wheeler) for generator
SWAGED POLES / OCTOGONAL POLES, GARDEN POSTS AND ACCESSORIES
Fabrication, supply and transportation of all sizes swaged poles up to site confirming to IS 2713 / 1980
specifications. The pole should be painted with primary coat of red oxide and black bituminous paint up to
Fabrication and Supply of M.S. Poles for garden posts with 'B' class 60.25mm outer dia with base plate
ground level with base plate, including cost of all materials etc., complete.(Rate per K. G)
and suitable pole cap including cost and conveyance of all material including fixing of luminaire and labour
Supply of different sizes of M. S. Pipe brackets (Rate per K.G)
charges etc., complete. (Rate per K. G)
Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S
355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply
Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S
of suitable boards with bakelite sheet and MCB's as per IS specification suitable to withstand the wind
355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of
speed of 180Transportation
KMPH for 7.50
Mtrs
heightofPole
having
dimensions
BottomPole
130with
mm,.
Top 70mm
3mm
Fabrication,
and
supply
hot-dip
galvanized
Octogonal
BSEN
- 10025with
grade
S
suitable boards with bakelite sheet and MCB's as per IS specification suitable to withstand the wind speed
thick,JO
base
220 xIS12mm
andbase
4 Nos
ofwith
M20
x 700
longarrangement,
'J' bolts along
with the
template
355
steelplate
plate220
for xshaft,
2062 for
plate
door
opening
including
supply of
of 180 KMPH
for 7.50 Mtrs and
height
Pole of
having
dimensions
Bottom
130 mm,.
3mm
thick,
Fabrication,
Transportation
supply
hot-dip
galvanized
Octogonal
Pole Top
with 70mm
BSEN with
-10025
grade
S
MakesBajaj
/ Valmont
/ TRANSRAIL.
suitable
boards
with bakelite
sheet and MCB's as per IS specification suitable to withstand the wind speed
base
plate
220
x 220
12mm
Nos
of plate
M20 with
x 700
long
'J' bolts
along with
template
Makes
355 JO
steel
plate
for xshaft,
IS and
20624 for
base
door
opening
arrangement,
including
the of
supply
of
of 180 KMPH
for 9 Mtrs height
having
dimensions
Bottom 155 mm,. Top 70mm with 3mm thick, base
Fabrication,
Transportation
andPole
supply
of hot-dip
galvanized
Surya. /LAASMA
suitable
boards with bakelite sheet and MCB's as per IS specification suitable to withstand the wind speed
plate 260 xPole
260 with
x16mm
and- 10025
4 Nos grade
of M24
x 750
bolts
along IS
with
template
Makes
Octogonal
BSEN
S 355
JO long
steel 'J'
plate
for shaft,
2062
for baseofplate
withBajaj
door/
ofFabrication,
180 KMPH for
9mtrs heightand
Pole
having
dimensions
BottomOctogonal
155mm, Top
with 3mm
thick,
Transportation
supply
of hot-dip
galvanized
Pole70mm
with BSEN
- 10025
Valmont /arrangement,
Aster / TRANSRAIL
. the supply of suitable boards with bakelite sheet and MCB's as per IS
opening
including
base plate
260 JO
x260
x16mm
of M24
long 'J'
along with
Makes opening
Surya. /
grade
S 355
steel
plateand
for4 Nos
shaft,
ISx 750
2062
forboltsbase
platetemplate
with of door
specification
suitable to withstand
the wind
speedgalvanized
of 180 KMPH
for 10Pole
Mtrs with
height
Pole -having
Fabrication, Transportation
and supply
of hot-dip
Octogonal
BSEN
10025
LAASMA
arrangement,
including the supply of suitable boards with bakelite sheet and MCB's as per IS
dimensions
175 mm,.Top
3mm2062
thick, base
x 275 x16mm
and 4 opening
Nos of
grade
S 355Bottom
JO steel
plate for 70mm
shaft,with IS
for plate
base275plate
with door
specification
suitable to withstand
the wind
speed galvanized
of 180 KMPH
for 10 Pole
Mtrs with
height
Pole -having
Fabrication, Transportation
and supply
of hot-dip
Octogonal
BSEN
10025
M24 x 750 longincluding
'J' bolts along
with template
of Makes
Bajajwith
/ Valmont
arrangement,
the supply
of suitable
boards
bakelite/ TRANSRAIL.
sheet and MCB's as per IS
dimensions
175 plate
mm,.forTop shaft,
70mm IS
with 2062
3mm thick,
275 xwith
275 x16mm
and 4
grade
S 355Bottom
JO steel
for base
baseplateplate
door opening
specification
suitable to withstand
theofwind
speed
of 180
KMPH
for 12 mtrs
Pole
having
Fabrication, Transportation
and supply
1.0 Mtr
Length
Single
Arm Bracket
madeheight
with MS
galvanized
Nos of M24 x including
750 long the
'J' bolts
alongofwith
template
of Makes:
LAASMAsheet
/ Surya.
arrangement,
supply
suitable
boards
with bakelite
and MCB's as per IS
dimensions
Bottom
200mm / 240mm, Top 100mm / 90mm with 4mm thick, base plate 320 x320
40mm
/ 50mm
dia Pipe.
specification
to withstand
the wind
of 180
KMPH
for Arm
12 mtrs
height
Polewith
having
Fabrication, suitable
Transportation
and supply
of speed
1.50 Mtr
Length
Single
Bracket
made
MS
x20mm and 4 Nos of M24 x 850 long 'J' bolts along with template of Makes Bajaj / Valmont
dimensions 40mm
Bottom/ 50mm
200mm
240mm, Top 100mm / 90mm with 4mm thick, base plate 320 x320
galvanized
dia/ Pipe.
/TRANSRAIL.
Fabrication, Transportation and supply of 1 Mtr length Double Arm Bracket made with MS galvanized
x20mm and 4 Nos of M24 x 850 long 'J' bolts along with template of Makes: LAASMA / Surya.
40mm / 50mm dia Pipe.
Fabrication, Transportation and supply of 1.50 Mtr length Double Arm Bracket made with MS
galvanized 40mm / 50mm dia Pipe.
Fabrication, Transportation and supply of of 1.5mtrs sword type decorative double arm bracket
with dooms either sides complete with all accessories with MS galvanized 40mm / 50mm dia
Pipe.
Fabrication,transportation and supply of
MS hot dip galvanized 9.0 Mtrs long octagonal
poles with 3mm thick HT steel plate with a bottom 200mm / 240mm dia and top 100mm /
90mm dia, base plate of size 290mm x 290mm x 16mm thick welded to bottom of pole, terminal
box with door size of 500mm x 100mm with all accessories connector and fuse base and
fixing arrangements for advertisements holdings, foundation bolts with washers and nuts 4 sets
with all accessories as per the requirements at site and as per the directions of field engineers
during execution for finished item of work. Makes: Bajaj / Valmont / TRANSRAIL.

Fabrication,transportation and supply of


MS hot dip galvanized 9.0 Mtrs long octagonal
poles with 3mm thick HT steel plate with a bottom 200mm / 240mm dia and top 100mm /
90mm dia, base plate of size 290mm x 290mm x 16mm thick welded to bottom of pole, terminal
box with door size of 500mm x 100mm with all accessories connector and fuse base and
fixing arrangements for advertisements holdings, foundation bolts with washers and nuts 4 sets
with all accessories as per the requirements at site and as per the directions of field engineers
during execution for finished item of work. Makes: LAASMA / Surya.

Foundation and erection charges for 9 mtrs / 10 Mtrs long Octagonal/Conical pole duly erecting
on base plate 290mm x 290mm x 16mm thick duly providing 4 Nos. foundation bolts with nuts with
providing of M20 c.c work vibrated concreting mixing with necessary steel (15kgs) reinforcement as
directed by the field engineers during execution including all labour charges and cost and
conveyance of materials etc. complete.

Fabrication, transportation and supply of 12 Mtrs Polygon High Mast with single section of 3mm thick
of Bottom 350mm / 360mm and Top 125mm / 100mm dia with BSEN - 10025 grade S 355 JO steel plate
for shaft, IS 2062 for base plate, having a base plate of size 520mm dia 16mm thick with its
accessories. Mast shall be in single section for 12 Mtrs and 2 sections for 16 and 20 Mtrs. Mast shall be
hot dip galvanized and suiatble for wind velocity of 180 KMPH as per IS 875 part 3 including head frame,
2 point suspension system with steel rope 6mm dia (7/19) construction double drum winch / power
tool operating speed of 900 RPM, and necessary cable trailer connections and single speed motor
with M 24 x 800 mm foundation bolts of required quantity, suitable for 6 luminaires with GLS type aviation
twin lamp Makes: Bajaj / Valmont / TRANSRAIL.

Fabrication, transportation and supply of 12 Mtrs Polygon High Mast with single section of 3mm thick
of Bottom 350mm / 360mm and Top 125mm / 100mm dia with BSEN - 10025 grade S 355 JO steel
plate for shaft, IS 2062 for base plate, having a base plate of size 520mm dia 16mm thick with its
accessories. Mast shall be in single section for 12 Mtrs and 2 sections for 16 and 20 Mtrs. Mast shall be
hot dip galvanized and suiatble for wind velocity of 180 KMPH as per IS 875 part 3 including head
frame, 2 point suspension system with steel rope 6mm dia (7/19) construction double drum winch /
power tool operating speed of 900 RPM, and necessary cable trailer connections and single speed
motor with M 24 x 800 mm foundation bolts of required quantity, suitable for 6 luminaires with GLS
type aviation twin lamp Makes: LAASMA / Surya.

Fabrication, transportation and supply of 16 Mtrs Polygon High Mast with two sections of Bottom 4mm
thick and Top section with 3mm thick with GLS type aviation lamp of Bottom 350mm and Top 125mm
dia with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate, having a base
plate of size 560mm dia 25mm thick with its accessories. Mast shall be in single section for 12 Mtrs and
2 sections for 16 and 20 Mtrs. Mast shall be hot dip galvanized and suiatble for wind velocity of 180
KMPH as per IS 875 part 3 including head frame, 2 point suspension system with steel rope 6mm dia
(7/19) construction double drum winch / power tool operating speed of 900 RPM, and necessary
cable trailer connections
and single speed motor with M 24 x 800 mm foundation bolts of required
quantity with GLS type aviation twin lamp Makes: Bajaj / Valmont / TRANSRAIL.

Fabrication, transportation and supply of 16 Mtrs Polygon High Mast with two sections of Bottom 4mm
thick and Top section with 3mm thick with GLS type aviation lamp of Bottom 350mm and Top 125mm
dia with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate, having a base
plate of size 560mm dia 25mm thick with its accessories. Mast shall be in single section for 12 Mtrs and
2 sections for 16 and 20 Mtrs. Mast shall be hot dip galvanized and suiatble for wind velocity of 180
KMPH as per IS 875 part 3 including head frame, 2 point suspension system with steel rope 6mm dia
(7/19) construction double drum winch / power tool operating speed of 900 RPM, and necessary cable
trailer connections and single speed motor with M 24 x 800 mm foundation bolts of required quantity
with GLS type aviation twin lamp Makes: LAASMA / Surya.

Fabrication, transportation and supply of 16 Mtrs Polygon High Mast with two sections of Bottom 4mm
thick and Top section with 3mm thick with GLS type aviation lamp of Bottom 410mm and Top 150mm
dia with BSEN - 10025 grade S 355 JO steel platefor shaft, IS 2062 for base plate, having a base plate
of size 560mm dia 25mm thick with its accessories. Mast shall be in single section for 12 Mtrs and 2
sections for 16 and 20 Mtrs. Mast shall be hot dip galvanized and suiatble for wind velocity of 180 KMPH
as per IS 875 part 3 including head frame, 2 point suspension
system with steel rope 6mm dia(7/19)
construction double drum winch / power tool operating speed of 900 RPM, and necessary cable trailer
connections and single speed motor with M 24 x 800 mm foundation bolts of required quantity with GLS
type aviation twin lamp Makes: Bajaj / Valmont / TRANSRAIL.

Fabrication, transportation and supply of 16 Mtrs Polygon High Mast with two sections of Bottom 4mm
thick and Top section with 3mm thick with GLS type aviation lamp of Bottom 410mm and Top 150mm
dia with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate, having a base
plate of size 560mm dia 25mm thick with its accessories. Mast shall be in single section for 12 Mtrs and
2 sections for 16 and 20 Mtrs. Mast shall be hot dip galvanized and suiatble for wind velocity of 180
KMPH as per IS 875 part 3 including head frame, 2 point suspension system with steel rope 6mm dia
(7/19) construction double drum winch / power tool operating speed of 900 RPM, and necessary cable
trailer connections and single speed motor with M 24 x 800 mm foundation bolts of required quantity
with GLS type aviation twin lamp Makes: LAASMA / Surya.

Fabrication, transportation and supply of 20 Mtrs Polygon High Mast with two sections of Bottom 4mm
thick and Top section with 3mm thick of Bottom 400mm / 410mm and Top 150mm /150mm dia with
BSEN -10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate, having a base plate of size
570mm dia 25mm thick with its accessories. Mast shall be in single section for 12 Mtrs and 2
sections for 16 and 20 Mtrs. Mast shall be hot dip galvanized and suiatble for wind velocity of
180 KMPH as per IS 875 part 3 including head frame, 2 point suspension system with steel rope
6mm dia (7/19) construction double drum winch / power tool operating speed of 900 RPM, and
necessary cable trailer connections and single speed motor with M 24 x 800 mm foundation bolts of
required quantity with GLS type aviation twin lamp of Makes: Bajaj / Valmont / TRANSRAIL.

Fabrication, transportation and supply of 20 Mtrs Polygon High Mast with two sections of Bottom 4mm
thick and Top section with 3mm thick of Bottom 400mm /410mm and Top 150mm / 150mm dia with
BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate, having a base plate of size
570mm dia 25mm thick with its accessories. Mast shall be in single section for 12 Mtrs and 2
sections for 16 and 20 Mtrs. Mast shall be hot dip galvanized and suiatble for wind velocity of
180 KMPH as per IS 875 part 3 including head frame, 2 point suspension
system with steel
rope 6mm
dia
(7/19) construction double drum winch / power tool operating speed of 900 RPM,
and necessary cable trailer connections and single speed motor with M 24 x 800 mm foundation
bolts of required quantity with GLS type aviation twin lamp of Makes: LAASMA / Surya.

Supply and fixing of suitable feeder piller box made with 14 SWG CRCA sheet including S & F of
Legrand / Schnieder / Siemens / ABB / L&T make 40A TP MCB, 6 Nos SP MCB's, bus bars, 6 Sqmm
3 core copper cable for invidual light control, contactor, suitable timer and connectors and
provision for energy meter etc., complete for finished item of work.
Supply and fixing of suitable feeder piller box made with 14 SWG CRCA sheet including S & F of
Legrand / Schnieder / Siemens / ABB / L&T make 63A TP MCB, 8 Nos SP MCB's, bus bars, 6 Sqmm
3 core copper cable for invidual light control, contactor, suitable timer and connectors and provision for
energy meter etc., complete for finished item of work.
Earth work exacavation with a approximate quantity of 4.0 Cum for errection of 12 Mtrs high
mast and refilling with a quantity of 0.53 Cum of PCC 1:4:8, 1.50 Cum M 20 grade concrete
and (80 Kgs) reinforced steel of 12mm / 10mm / 8mm, Soil bearing capacity of 10 T/Sqm, Anchor
plate with cost and conveyance of all above materials including labour charges for errection of High Mast
and Carraige etc complete.
Earth work exacavation with a approximate quantity of 6.0 Cum for errection of 16 Mtrs high mast and
refilling with a quantity of 0.65 Cum of PCC 1:4:8, 2.60 Cum M 20 grade concrete and (110 Kgs)
reinforced steel of 12mm / 10mm / 8mm, Soil bearing capacity of 10 T/Sqm, Anchor plate with cost and
conveyance of all above materials including labour charges for errection of High Mast and Carraige etc
complete.
Earth work exacavation with a approximate quantity of 7.0 Cum for errection of 20 Mtrs high mast and
refilling with a quantity of 0.75 Cum of PCC 1:4:8, 3.60 Cum M 20 grade concrete and (140 Kgs)
reinforced steel of 12mm / 10mm / 8mm, Soil bearing capacity of 10 T/Sqm, Anchor plate with cost and
conveyance of all above materials including labour charges for errection of High Mast and Carraige etc
complete.
Fabrication,transportation and supply of MS hot dip galvanized 9.0 Mtrs long octagonal poles with 3mm
thick HT steel plate with a bottom 155mm dia and top 75mm dia, base plate of size
260mmx260mmx16mm thick welded to bottom of pole, terminal box with door size of 500mm x 100mm
with all accessories connector and fuse base and a fixing arrangements for advertisements holdings,
foundation bolts with washers and nuts 4 sets. including S&F of 1.5mtrs sword type decorative single
arm bracket with dooms either sides complete with all accessories as per the requirements at site
and as per the directions of field engineers during execution for finished item of work. Makes: Bajaj /
Valmont / TRANSRAIL.

Fabrication,transportation and supply of MS hot dip galvanized 9.0 Mtrs long octagonal poles with
3mm thick HT steel plate with a bottom 155mm dia and top 75mm dia, base plate of size
260mmx260mmx16mm thick welded to bottom of pole, terminal box with door size of 500mm x 100mm
with all accessories connector and fuse base and a fixing arrangements for advertisements holdings,
foundation bolts with washersand nuts 4 sets. including S&F of 1.5mtrs sword type decorative
single arm bracket with dooms either sides complete with all accessories as per the requirements at
site and as per the directions of field engineers during execution for finished item of work.
Makes:LAASMA / Surya.

Fabrication,transportation and supply of


MS hot dip galvanized 9.0 Mtrs long Conical
poles with 3mm thick HT steel plate with a bottom 173mm dia and top 75mm dia, base plate of
size 275mm x 275mm x 16mm thick welded to bottom of pole, terminal box with door size of
500mmx100mm with all
accessories connector and fuse base and a fixing arrangements
for
advertisements holdings, foundation bolts with washers
and nuts 4 sets. including S&F of 1.0 mtrs C type decorative single arm with painted
bracket with dooms either sides complete with all accessories as per the requirements at site
and as per the directions of field engineers during execution for finished item of work. Makes Bajaj /
Valmont / TRANSRAIL.

Fabrication, transportation and supply of MS hot dip galvanized 9.0 Mtrs long Conical poles with
3mm thick HT steel plate with a bottom 173mm dia and top 75mm dia, base plate of size
275mmx275mmx16mm thick welded to bottom of pole, terminal box with door size of 500mmx100mm
with all accessories connector and fuse base and a fixing arrangements for advertisements holdings,
foundation bolts with washers and nuts 4 sets. including S&F of 1.0 mtrs C type decorative single
arm with painted
bracket with dooms either sides complete with all accessories as per the
requirements at site and as per the directions of field engineers during execution
for finished item of work. Makes: LAASMA / Surya.

Fabrication,transportation and supply of


MS hot dip galvanized 10.0 Mtrs long Conical
poles with 3mm thick HT steel plate with a bottom 184mm dia and top 75mm dia, base plate of size
275mmx275mmx16mm thick welded to bottom of pole, terminal box with door size of 500mmx100mm
with all accessories connector and fuse base and a fixing arrangements for advertisements holdings,
foundation bolts with washers and nuts 4 sets. including S&F of 1.5 mtrs C type decorative
Double arm with painted bracket with dooms either sides complete with all accessories as per
the requirements at site and as per the directions of field engineers during execution for finished item of
work. Makes: Bajaj / Valmont / TRANSRAIL.

Fabrication,transportation and supply of MS hot dip galvanized 10.0 Mtrs long Conical poles with
3mm thick HT steel plate with a bottom 184mm dia and top 75mm dia, base plate of size
275mmx275mmx16mm thick welded to bottom of pole, terminal box with door size of 500mmx100mm
with all accessories connector and fuse base and a fixing arrangements for advertisements holdings,
foundation bolts with washers and nuts 4 sets. including S&F of 1.5 mtrs C type decorative Double
arm with painted
bracket with dooms either sides complete with all accessories as per the
requirements at site and as per the directions of field engineers during execution for finished item of
work. Makes: LAASMA / Surya.

Supply of following sizes thermo plastic pole boxes IP 65


protection Make : Hensel / Sintex
300X150X170
300X300X170

300X450X170
300X600X170
Erection charges for 7.50 Mts long Octagonal pole on bridge kerb portion (R.C.C). with 4 Nos 8"
Anchor bolts/ M20xsuitable "J" type bolts etc duly drilling holes to RCC slab and with V.C.C. M.15
concrete for base concreting up to a height of 8" with necessary Reinforcement work
etc.
including cost and conveyance of all material and all labour charges etc. complete as directed by the
department officers.
Supply
and
transportation of
following
glass
reinforced polymer (GRP) composite type
Conical pole with single arm bracket of length 1Mtr and internal junction box including labour
charges etc., complete. Makes: Bajaj / Kemrock / Sumip.
3.00 Mtrs height, Bottom dia 143mm, Top 76mm, AV thickness 6mm and to withstand maximum wind
velocity 155Km/Hr
4.00 Mtrs height, Bottom dia
143mm, Top 76mm, AV thickness 6mm and to withstand
maximum wind velocity 155Km/Hr
6.00 Mtrs height, Bottom dia
143mm, Top 76mm, AV thickness 6mm and to withstand
maximum wind velocity 155Km/Hr
8.00 Mtrs height, Bottom dia
193mm, Top 76mm, AV thickness 6mm and to withstand
maximum wind velocity 155Km/Hr
10.00 Mtrs height, Bottom dia 227mm, Top 76mm, AV thickness 6mm and to withstand maximum wind
velocity 155Km/Hr
Supply and transportation of base bracket suitable for glass reinforced polymer (GRP) composite
type pole including labour charges etc., complete. Makes: Bajaj / Kemrock / Sumip.
For 3.00 Mtrs Pole
For 4.00 Mtrs Pole
For 6.00 Mtrs Pole
For 8.00 Mtrs Pole
For 10.00 Mtrs Pole
CONTROL PANEL BOARD
Fabrication and erection of 14SWG CRCA sheet steel enclosure for power control cubicle
panel / boxes etc., including cutting, bending drilling, welding and reveting etc., complete with
cleaning with 7 tank process and painting with powder coating including cost and conveyance of all
materials and labour charges.
Fabrication and erection of 16 SWG CRCA sheet steel enclosure for power control cubicle panel
/ boxes etc., including cutting, bending drilling, welding and reveting etc., complete with cleaning with
7 tank process and painting with powder coating including cost and conveyance of all materials and
labour charges.
Fabrication and erection of 18SWG CRCA sheet steel enclosure for power control cubicle panel / boxes
etc., including cutting, bending drilling, welding and reveting etc., complete with cleaning with 7 tank
process and painting with powder coating including cost and conveyance of all materials and labour
charges.
METERING EQUIPMENT
Supply and erection of 0-415V volt Digital meter on exisiting box / panel board including connections
etc., complete.CONZERVE /ELMEASURE / MECO / HPL MAKE.
Supply and erection of 0-415V volt Analog meter of on exisiting box / panel board including connections
etc., complete.CONZERVE /ELMEASURE / MECO / HPL MAKE.
Supply and erection of 0-100 /200 /400 /600 /1000 Digital Ammeter of size 96x96mm on existing
box/panel board including connections etc., complete. CONZERVE/ ELMEASURE/ MECO/ HPL MAKE.
Supply and erection of 0-100/ 200 / 400 / 600 /1000 Analog Ammeter of size 96x96mm on existing box /
panel board including connections etc., complete. CONZERVE/ ELMEASURE/ MECO/ HPL MAKE.

Supply and erection of Digital frequency meter of size 96x96mm on existing box / panel board including
connections etc., complete.CONZERVE / ELMEASURE/MECO / HPL MAKE.

Supply and erection of Digital power factor meter, 3 phase, 4 wire balanced or unabalanced load 5A,
415V
of
size 96x96mm on existing box / panel board including connections
etc.,complete.CONZERVE/ELMEASURE/MECO/ HP MAKE.
Supply and erection of L.T. 3phase Digital multifunction energy meter with 3 lines LCD display of size
96x96mm for measuring all the parameters (voltage / Current / Power / frequency / power factor / kw /
kwh / KVAR/ KVARH/) on existing box panel board including connections etc.,
Supply and erection of selector switch for voltmeter / Ammeter on the existing box / panel including
complete.CONZERVE/ELMEASURE/MECO/ HPL MAKE.
connections etc., complete. L&T / C&S / SALZAR / HPL MAKE.
Supply and erection of LED indicator lamps on the existing box / panel board.L&T / C&S / SALZAR / HPL
MAKE.
Supply and erection of LT current transformer with bar primary 100/5A to 1000 / 5A ratio in the existing
box / panel including connections etc., complete. KAPPA MAKE.
Supply and fixing of single phase Electronic energy Meter,240V AC,50 HZ as per IS13010 up to
40A range with 200% over load capacity complete with connections etc., complete on the existing board.
CONZERVE / ELMEASURE / MECO / HPL / HAVELLS MAKE.
Supply and fixing of three phase Electronic energy Meter, 415V AC,50 HZ as per IS13010 up to 40A
range with 200% over load capacity complete with connections etc., complete on the existing
board. CONZERVE / ELMEASURE / MECO / HPL / HAVELLS MAKE.
Supply and fixing of 8 Stage APFC Relay with connection etc complete.(L&T / Siemens / EPCOS /
Schneider / Elmeasure)
Supply and fixing of 14 Stage APFC Relay with connection etc complete.(L&T/ Siemens / EPCOS/
Schneider /Elmeasure)
SUB STATION EQUIPMENT
Carryout routine maintenance, servicing and testing of 630A to 1000A L.T.ACB by cleaning fixed contacts,
moving contacts and arcchutes including servicing and putting the ACB in perfect working condition after
Carryout routine maintenance and servicing of LT.Cubical pannel board having approximately 15 to 22
detting all relay and ON, OFF mechanism etc. Done with only manufacturing companies
Nos of switches cleaning with power brower and servicing the contacts, tightning the connection of
Routine maintenance of transformer in operation covering insulation resistance oil, break down strength.
incoming and outgoing cables, and clicking the operating machanism for smooth functioning of switches
Reconditioning / replacement of silicazel, cleaning of transformer and topping upto oil level if required
and putting
them in smooth
condition.
Testing
of Transformer
oil forworking
dielectric
breakdown strength.
(extra cost will be paid for oil).
Removing
the existing transformer from the plinth / Pole and refixing the standby transformer of
following capacity including connections etc., complete.- Upto 315 KVA
Removing
the existing transformer from the plinth / Pole and refixing the standby
following capacity including connections etc., complete. -500 / 1000 KVA

transformer of

Replacing old and unserviceable gasket of top cover plate of transformer having following capacity. -Upto
315 KVA
Replacing old and unserviceable gasket of top cover plate of transformer having following capacity. -500 /
1000 KVA
Replacing old and unserviceable gasket
315 KVA

of H. T

bushing for the following Transformer capacity. -Upto

Replacing old and unserviceable gasket


1000 KVA

of H. T

bushing for the following Transformer capacity. -500 /

Replacing old and unserviceable gasket of L.T bushing for the following transformer capacity. Upto 315
KVA
Replacing old and unserviceable gasket of L.T bushing for the following transformer capacity. 500 / 1000
KVA
Replacement the H/T / L. T burntout
winding coils of distribution transformer
including
rewinding, varnishing and vaccuming etc.,duly retaining the removed burnt winding coils by the
Contractor / Firm- For copper coils

Replacement the H/T / L. T burntout


winding coils of distribution transformer
including
rewinding, varnishing and vaccuming etc.,duly retaining the removed burnt winding coils by the
Contractor / Firm - For aluminium coils
Insulating HT / LT copper / aluminium coils for Transformers.
Painting with 2 coats Zinchromate red oxide duly scraping existing paint
hammerton grey paint etc., complete. -Upto 500 KVA

followed by 2 coats of

Painting with 2 coats Zinchromate red oxide duly scraping existing paint
hammerton grey paint etc., complete. - 630 / 1000 KVA

followed by 2 coats of

Replacing H.T bushing for distribution Transformer by new one.


Replacing H.T bushing metal parts for distribution Transformer by new one.
Replacing L.T bushing for distribution Transformer by new one for the following capacities. - Upto 315
KVA
Replacing L.T bushing for distribution Transformer by new one for the following capacities.- 500 / 1000
KVA
Replacing L.T bushing metal parts for distribution Transformer by new one for the following capacities.
-100 KVA
Replacing L.T bushing metal parts for distribution Transformer by new one for the following capacities.
-250 / 315 KVA
Replacing L.T bushing metal parts for distribution Transformer by new one for the following capacities.
-500 KVA
Replacing L.T bushing metal parts for distribution Transformer by new one for the following capacities.
-1000 KVA
Drying the repaired transformer with appropriate heat / air of following capacity of transformers. -Upto 315
KVA
Drying the repaired transformer with appropriate heat / air of following capacity of transformers. -500 /
1000KVA
Loading and Unloadng of transformer from site to Workshop or vice verse. -Upto 500 KVA

Loading and Unloaidng of transformer from site to Workshop or vice verse. -630 / 1000 KVA

Transformer oild tested as per IS-335 - 1972 (per Ltr)


Filteration of transformer oil as per ISS specifications filters to die electric strength above 40 K. V at site.
(per Ltr)
Filteration of transformer oil as per ISS specifications filters to die electric strength above 40 K. V at
workshop (per Ltr)
Supply of MPP type heavy duty capacitor of operating voltage not less than 480V and losses not
more than 0.35W per KVAR and inrush current withstand capability 300 times the rated current.
Makes:L&T/Siemens/Schneider/Eplos.

Supply, transportation and delivery at site of 3 Phase, 50 Hz, oil immersed and naturally cooled, outdoor /
Indoor type copper wound transformer designed and manufactured as per IS 2026-1977 and 1st filling
of oil as per IS 335 of 1993, connected delta on primary side and Star on secondary side with additional
neutral brought out on load side, 1100V / (433V / 415V) with HV tapping + or - 2.5% contineously rated for
full load and temporature rise not exceeding 50C in oil and 55C rise by th resistance of the winding after
contineous run on full load rating complete with the following standard mountings. Makes: Kirloskar / Vijay
Electricals / PETE / Esennar

(Note:Other than these makes / brands mentioned rate may be allowed as approved by AP Electricity
Board).
1. Rated KVA :
........KVA
2. Service:
Outdoor / Indoor
3. Mounting :
Plinth.
4. Copper wound :
Double.
5. Type :
Core.
6. Cooling :
ONAN
7. Temp .
Rise : 55:C.
8. Vector Group:
Dyn 11
9. Primary Connection : Delta
10. Primary Volts :
11000
11. Primry Frequency : 50
12.Primary Phases :
3
13. Primary wires:
3
14. Secondary connection : Star
15. Secondary Volts :
415 / 433V
16. Secondary phases :
3
17. Secondary wires:
4
18. Taps on primary winding for primary voltage variation :
+7.5% to - 7.5% in steps of 2.5%,

19. Terminal arrangement.


a. HV: Bare Busings / Cable end box b. LV : Cable box
20. LV : One separate terminal for earthing.
20. No load losses (Watts): ..........As per IS specification
21. Load losses (Watts): ............As per IS specification
22. Impedance(Z%) :
.............As per IS specification
21. Fittings & Accessories.
a. Rating and terminal marking plate b. Earthing terminals
c. Lifting Lugs
d. Conservator with drain plug. e. Oil level Indicator
f. Dehydrating silicagel breather
g. Air release device
h. Drain cum filter wall
i. Explosion vent with diaphragm j. Radiators (Attachable)
k. Seperate neutral bushing
l. Uni directional flat rollers.
... do. 63 KVA Copper Wound Transformer
... do. 100 KVA Copper Wound Transformer
... do. 160 KVA Copper Wound Transformer
... do. 250 KVA Copper Wound Transformer
... do. 315 KVA Copper Wound Transformer
... do. 500 KVA Copper Wound Transformer

Supply, transportation and delivery at site of 3 Phase, 50 Hz, Dry type, Indoor type copper wound
transformer designed and manufactured as per IS 2026-1977 and IS 11171-1985,connected delta on
primary side and Star on secondary side with additional neutral brought out on load side, 1100V / (433V /
415V) with HV tapping + or - 2.5% temporature rise by the resistance 90:C. complete with the following
standard mountings.Makes: Kirloskar / Vijay Electricals / PETE / Esennar

(Note : Other than these makes / brands mentioned rate


may be allowed as approved by AP Electricity Board).
1. Rated KVA : ........KVA (Cast Resin)
2. Service:
Indoor
3. Mounting :
Floor.
4. Copper wound :
Double.
5. Type of cooling :
ANAN.
6. Insulation Class : Class F
7. Temparature rise by resistance : 90:C
8. Vector Group:
Dyn 11
9. Primary Connection : Delta
10. Primary Volts :
11000
11. Primry Frequency : 50
12.Primary Phases :
3
13. Primary wires:
3
14. Secondary connection : Star
15. Secondary Volts :
433V / 415V
16. Secondary phases :
3
17. Secondary wires:
4
18. Taps on primary winding for primary voltage variation :
+5.0% to - 10.0% in steps of 2.5% through links.

19. Terminal arrangement.


a. HV: Cable end box b. LV : Cable end box
20. No load losses (Watts): ........... As per IS specifications
21. Load losses (Watts): ..............As per IS specifications
22. Impedance(Z%) :
............As per IS specifications

21. Fittings & Accessories.


a. Rating and terminal marking plate b. Earthing terminals
c. Lifting Lugs
d. Winding temporature Indicator
e. Seperate neutral bushing
f. Uni directional flat rollers.
... do. 100 KVA Copper Wound Transformer
... do. 250 KVA Copper Wound Transformer
... do. 315 KVA Copper Wound Transformer
... do. 500 KVA Copper Wound Transformer
LIGHTENING PROTECTIVE SYSTEM
Supply and erecting approved make 11KV, 5KA metal oxide lightning arrestors suitable for 11 KV supply
with necessary materials on existing cross arm.

Supply and erecting porcelain disc type insulator suitable for 11KV line with suitable hardware on existing
cross arms.

Supply and erecting porcelain pin type insulator suitable for 11KV line with suitable hardware on existing
cross arms.
Supply and erecting porcelain post type insulator suitable for 11KV line
existing cross arms.

with suitable hardware on

Supply and erecting porcelain pin/shackle type insulator suitable for L. T.


Supply and fixing of lightning protective system conforming to IS : 2309 with all standard accessories
such as metal globe finials on the top of the builiding with 25.4 mm dia 3.0mtrs. Length of 'B' class G.I
pipe etc., complete without down conductors and earthing.

Approved made 11KV, 400A


conveyance of all materials.

A.B switch with all standard accessories etc., complete with cost and

Approved made 11KV, 200A A.B switch with all standard accessories etc.,complete with cost and
conveyance of all materials.
Approved made 11KV, 200A A.B switch (tilting) with all standard accessories etc., complete with cost and
conveyance of all materials.
11KV, H.G fuse set including all standard accessories etc., complete with cost and conveyance of all
materials.
Supply of 7/3.15 AAA C all Alluminium annealed conductor Rabit.
Supply of 7/2.50 AAA C all Alluminium annealed conductor Weasel.
Supply of 9.1 Mtr PSCC Pole 280 Kg Working load.
Supply of 8.0 Mtr PSCC Pole 140 Kg Working load.
Supply of 175 x 85 mm / 150 x 75 mm RS Joist.
Supply and installation of NIMBUS CPT-3/NLP 2200 / FOREND (ESE-EU) Advanced lighting protection
with capturing head of 135 - 210mm diameter, 205 -580mm height and 4.60 - 4.940 kgs , and having Rod
length 760mm, weight 1.795 kgs with stainless steel rod, working on the principle of (ESE) Early
Streamer Emission technology, having a coverage radius of 79mts when mounted on 10 - 15 mts
Installation
and commissioning
NIMBUS
equivalent
advanced
lighting
height of existing
lattice tower ofgiving
level/ 1FOREND
protectionorand
anticipation
emission
time ofprotection
60 micro
systems
which
includes
seconds/72
micro
seconds. The NIMBUS is manufactured according to standard NFC 17 102 and UNE
1.
Laying including
of CC Bed
21186-96
functional integrity etc Complete. Make : NIMBUS / FOREND or equivalent
2. Installation of Lighting Rod
Supply
3. Layingofofelectro-Mechanical
Down conductor counter (Make: CIRPROTEC / INDALAC/INGESCO)
4. Installation of Counter
5.Installation of Earth Electrodes
6.
Interconnection
betweenofthe
Providing
earth electrode
lowElectrodes
carbon steel rod of 17mm dia coated with 250 microns thick copper 3mtr
7.Termination
of
down
conductor
to earth bus
etc complete
long with clamps and 2 bags of LORESCO
ZEROLITE
back fill compound etc complete (As per drawings
enclosed)
Supply of down conductor of 1x70sqmm single core PVC insulated unarmoured copper conductor cable
of ISI mark
(Make: Polycab /Havells / RPG / RR Kabel)

NET WORKING

Supply of 2 Pair, 0.5mm telephone copper wire of makes Finolex / Delton / Surabi / Polycab /
Nakoda / GM.

Supply of 5 Pair telephone copper wire of makes Finolex / Delton / Surabi / Polycab / Nakoda / GM.

Supply of LAN Cable cat - 6 UTP cable of makes D Link / AMP / Molex / Legrand / Krone.

Supply of Cat 6 RJ-45 information outlets including duel face plate of makes D Link / AMP / Molex /
Legrand / Krone.

Supply of 24 Port switches of makes D link / CISCO / Net Gear / HP.


Supply of 8 Port switches of makes D link / CISCO / Net Gear/ HP.
Supply of 3200 access point of makes Dlink / CISCO/ Net Gear /HP.
Supply of 7 feet length moulded patch cor0d of makes D Link / AMP / Molex / Legrand / Krone.

Supply of 3 feet length moulded patch cord of makes D Link / AMP / Molex / Legrand / Krone.

Supply of 24 port patch panels of makes D Link / AMP / Molex / Legrand / Krone.

Supply of 100 pair MDF loaded with 2/10 Modular of Krone


make or its equivalent.
Supply of 100 Pair raiser cable for telephone makes Finolex / Delton / Surabi / Polycab.

Supply of 10 Pair telephone Copper wire of makes Finolex / Delton / Surabi / Polycab / Nakoda.

Supply of 20 Pair telephone Copper wire of makes Finolex / Delton / Surabi / Polycab / Nakoda.
Supply of 50 Pair telephone Copper wire of makes Finolex / Delton / Surabi / Polycab.
Supply of 10 pair Telephone distribution box with back mount frame, krone connector, powder coated
metal body
with lock and key arrangement.
Supply of 20 pair Telephone distribution box with back mount frame, krone connector, powder coated
metal body with lock and key arrangement.
Supply of 50 pair Telephone distribution box with back mount frame, krone connector, powder coated
metal body with lock and key arrangement.
Supply of 200 pair Telephone distribution box with back mount frame, krone connector, powder
coated metal body with lock and key arrangement.
Supply of 6U floor mounting net work rack with power spike including all accessories of make HCL
/ Vall.

Supply of 9U floor mounting net work rack with power spike including all accessories of make
HCL / Vall.
Supply of 12U floor mounting net work rack with power spike including all accessories of make
HCL / Vall.
Supply of 15U floor mounting net work rack with power spike including all accessories of make
HCL / Vall.
Supply of 17U floor mounting net work rack with power spike including all accessories of make
HCL / Vall.
Supply of 42U floor mounting net work rack with power spike including all accessories of make
HCL / Vall.
Supply of 6 Core (Indoor/ Out door),Single mode armourd, Optic fibre cable of makes D Link / AMP /
Molex / Legrand / Krone.
Supply of 12 Core (Indoor / Out door), Single mode armourd, Optic fibre cable of makes D Link / AMP /
Molex / Legrand / Krone.
Supply of 6 port fibre distribution unit. (FDU / LIU) loaded with couplers etc complete of makes D
Link / AMP / Molex /Legrand / Krone.
Supply of 12 port fibre distribution unit. (FDU / LIU) loaded with couplers etc complete of makes D
Link / AMP / Molex / Legrand / Krone.
Supply of Subscriber connector (SC) to SC / LC patch card of 1 Mtr length of makes D Link /
AMP / Molex / Legrand / Krone.
Supply of Pigtails for fibre core connectivity of makes D Link / AMP / Molex / Legrand / Krone.
Supply of Cat 6 RJ-45 information outlets including Single face plate of makes D Link / AMP / Molex /
Legrand / Krone.
RACEWAYS AND JUNCTION BOXES
Supply of 100mm x 38mm G I Raceways of 2mm thick with top cover and required hard ware etc
complete.
Supply of 150mm x 38mm G I Raceways of 2mm thick with top cover and required hard ware etc
complete.
Supply of 300mm x 38mm G I Raceways of 2mm thick with top cover and required hard ware etc
complete.
Supply of 100mm x 25mm G I Raceways of 2mm thick with top cover and required hard ware etc
complete.
Supply of 150mm x 25mm G I Raceways of 2mm thick with top cover and required hard ware etc
complete.
Supply of 300mm x 25mm G I Raceways of 2mm thick with top cover and required hard ware etc
complete.
Supply of 172mm x 52mm G.I. Junction box of 2mm thick for direct acces to cables at the inter
section of Raceways.
Supply of 222mm x 52mm G.I. Junction box of 2mm thick for direct acces to cables at the inter
section of Raceways.
Supply of 372mm x 52mm G.I. Junction box of 2mm thick for direct acces to cables at the inter
section of Raceways.
MISSILLANEOUS ITEMS
Supply of single fancy bracket with glass shade best Indian make
Supply of double fancy bracket with glass shade best Indian make
Supply of 10" ceiling fittings with glass doom best Indian make
Supply of Bulk head fitting with cast aluminium enamel painted body with water tight, clear glass with wire
guard hinged with lock and key arrangements etc., complete of makes Bajaj / Crompton / Surya.

TW Seperators / Gutties
Rawl Plugs
U Nails
Alluminium Link Clips
50 mm G.I.Nut and Bolts.
63 to 100 mm G.I.Nut and Bolts.
50 mm 0 Gauge Nails
63 to 100 mm 0 Gauge Nails
Hard Coke
Salt
PVC Cleats 2 Way
PVC Cleats 4 Way
Binding Wire
PVC / Cotton Insulation tape Role ( 10 Mtrs)
C.I.Knob
Stay tight set (Jum bracket 300 mm)
Stay clamp with bolts and Nuts)
L.T.Guy insulator
12 / 15 MS plain rod fan hook
19 / 20 mm Steel tube fan down rod
Consealed box PVC / MS with hook for fan
Coil Earthing
Cable root Indicators
40 mm x 40 mm x 6 mm angle iron with I bolt.
Mild Steel Items
Acrylic Cover of size 4" x 7" for night lamps.
TW / PVC Round Blocks
G.I.Funnel with Mesh 1/2" x 4"
Asbestos Sheet
First Aid box 18" x 12" x 8"
11 KV/22 KV Hand gloves

Copper plate / Copper strip (Per K.G)


No. 8/10 SWG copper wire (per K.G)
PVC Insulated copper winding wire of fine quality (per K. G)
No. 14 SWG copper wire (per K. G)
Copper winding wire (per K. G)
G.I. Strip / Plate / Wire (per K. G)
Alluminum Bus bars/Strips/accessories
Alluminum winding wire
6.2 Volt series bulb (25 Nos.)
6.2 Volt series bulb with navar plate(25 Nos.)
Supply of Rotating machine
Supply and fixing of 6mm thick MS Chekered plate.
Supply and fixing of 6mm thick Alluminium Chekered plate.
Copper old winding Wire scrap for 1 Kg
Cement
Hylam Sheet
Earth work excacvation including all soils for trench, Pole Pit and Earth Pit.
Cost of Sand
Cost of Bricks
25mm Nominal Bore light grade G.I.Pipe
25mm Nominal Bore Medium grade G.I.Pipe
40mm Nominal Bore light grade G.I.Pipe
40mm Nominal Bore Medium grade G.I.Pipe
Drilling of 16 Nos through holes of 12mm dia to G.I pipe
G.I Nuts, Bolts an Washers each set
18" dia 2" thick hume pipe ring
18" dia 3" hume pipe ring
2" thick CC cover for hume pipe ring with handle.
Supply of Saddle / Clamps suitable for fixing 2 Core 4 to 10 Sqmm Cable.

Supply of Saddle / Clamps suitable for fixing 4 Core 4 & 6 Sqmm Cable.
Supply of Saddle / Clamps suitable for fixing 4 Core 10 & 16 Sqmm Cable.
Supply of Saddle / Clamps suitable for fixing 3.5 Core 25 & 35 Sqmm Cable.
Supply of Saddle / Clamps suitable for fixing 3.5 Core 50 Sqmm Cable.
Supply of Saddle / Clamps suitable for fixing 3.5 Core 70 & 95 Sqmm Cable.
Supply of Saddle / Clamps suitable for fixing 3.5 Core 120 to 185 Sqmm Cable.

Supply of Saddle / Clamps suitable for fixing 3.5 Core 240 & 300 Sqmm Cable.

Supply of Saddle / Clamps suitable for fixing 3.5 Core 400 Sqmm Cable.
Supply and fixing of anchor fastner with fan hook/ providing MS fan hook with grouting and cement
plastering
LABOUR RATES
Skilled Electrician
Semi Skilled Electrician / Lineman
Skilled Mason
Semi Skilled Mason
Skilled Welder
Semi Skilled Welder
Skilled Fitter
Semi Skilled Fitter
Helper (Electrical)
Skilled Carpenter
Semi Skilled Carpenter
Man Mazdoor
DG Set operator/Air Compressor
2nd Class DG Set operator/Air Com
Plumber (Licensed)/Pipe Fitter
Painter Class -2
Diploma Engineer / Surveyor
Graduate Engineer
ITI Certificate holder
Stenographer / Computer Operator
WIRELESS FIRE ALARAM SYSTEM
Supply and fixing of wireless smoke detection control panel of 28 wireless zones, 2 Hard wired Zones,
Tamper Alert, Pass code protected, RF jamming recognition, diagnostic feature for RF signal strength
Supply and fixing of Wireless Repeater.The wireless repeater extends the communication range of
between panel and each detector, vent reporting using PSTN telephone line, dialing upto 4 telephone
detection by relaying data between receiver and remote wireless transmitter. (Cease Fire / Visonic /
numbers, event reporting as per users choice, LCD screen display, two way voice interaction, battery
Honeywell / Secutron) Including transportation, all taxes and all labour charges etc complete.
backup stand by time up to 12 hrs. (Cease Fire / Visonic / Honeywell / Secutron) Including transportation,
all taxes and all labour charges etc complete.

Supply and fixing of Wireless Siren Strobe external wireless siren - a fully supervised power code
outdoor (IP55) wireless Siren and strobe light. Designed for external installation.Wire - Free connection
Supply and fixing of wireless Fully Supervised Smoke Detector, Photoelectric detection technology
between control panel and siren. Convenient rapid no- mess installation. Separate fire alarm signals, 98db
for superior detection sensitivity , sound and transmitted for smoke, tamper and low battery, works on
Piezo
siren and high
power
strobe
light. Weather resistant, IP55, 2-way communication for local and
ADDRESSABLE
- FIRE
ALARM
SYSTEM
power code protocol, easy programming and enrolling to the control panel, long life 9 volt alkaline or
remote diagnostics. Plug-in power supply, NIMH rechargeable back-up power battery, transmits status,
lithium battery.
(Ceasetesting
Fire / Visonic
/ Honeywell / Secutron)
Including10transportation,
all taxes based
and all
Supply,
Installation,
and commissioning
of wall mounting
loop micro processor
tamper, low- battery, supervisory and AC loss messages to the control panel, Tri- State tamper switch
labour charges
etc complete.
analog
addressable
fire control panel expandable by minimum 2 additional loops with minimum 80
identifiesInstallation,
screw manipulation
of cover or playing
from
the wall.(Cease
/ Visonic
/ Honeywell
Supply,
testing removal
and commissioning
of wall
mounting
10 loop Fire
micro
processor
based /
character LCD display 4 access levels 1000 events, historical logging, flash E-PROM, 240 volts AC
Secutron)
Including transportation,
all taxes
and all labour
charges etc
complete. loops with minimum 80
analog
addressable
fire control panel
expandable
by minimum
2 additional
Power supply,
automatic
battery
24V SLAofbatteries
suitable 8for
operating
the entire system
Supply,
Installation,
testing
and charger,
commissioning
wall mounting
loop
micro processor
based
character LCD display 4 access levels 1000 events, historical logging, flash E-PROM, 240 volts A C
includingaddressable
tack back units
the hooters/strobes
for a minimum
of 4 hours 2in battery
condition
the with
panel
analog
fireandcontrol
panel expandable
by minimum
additional
loops
Power supply,
automatic
charger, 24V SLA
batteries
suitable
operating
the entire
Supply,
Installation,
testing battery
and commissioning
of wall
mounting
8 loopformicro
processor
based system
analog
shall
have suitable
power amplifiers
for hooter
/ strobes
the panel
be capable
beeing
integrated
minimum
80 character
LCD display
4 access
levels
1000shall
events,
historical
logging,
flashwith
Eincluding tackfire
backcontrol
units and
the hooters/strobes
a minimum2 ofadditional
4 hours inloops
batterywith
condition
the panel
addressable
panel
expandable byforminimum
minimum
80
the BMSInstallation,
system
and
shall
include
cost of
supply,
of
any 24V
additional
modulesbased
or
interfaces
PROM,
240
volts
AC
Power
supply,
automatic
battery
charger,
SLA
batteries
suitable
for
Supply,
testing
and
commissioning
of wallinstallation
mounting
6 loop
micro
processor
analog
shall have LCD
suitable
power4amplifiers
for hooter
panel shall
be capable
beeing integrated
character
display
access levels
1000/ strobes
events, the
historical
logging,
flash E-PROM,
240 volts with
AC
required forthe
the
same.
The panel
panel
shall
betack
completed
as per
thethe
and as for
required
fixing ofof
10
operating
entire
system
including
back
and
hooters/strobes
a minimum
4
addressable
fire
control
expandable
by units
minimum
2specification
additional
loops
with
minimum
80
the BMS
system
andtesting
shall
include
cost of24V
supply,
of any additional
modules
or interfaces
Power
supply,
automatic
battery
charger,
SLA
batteries suitable
for operating
the entire
system
Supply,
Installation,
and commissioning
of installation
wall
loop Micro
processor
based4the
Fire
Alarmlevels
control
panel
with zonal
indictions
andfor
battery
back
up as 240
per
hours
in battery
panel
shall
have
suitable
power
amplifiers
hooter
/ strobes
the
character
LCD condition
display
access
1000
events,
historical
logging,
flash
E-PROM,
required
theback
same.
The
panel
shall be
completed
per fire
the specification
as required
of 10
including
tack
units
and
the based
hooters/strobes
for aasminimum
of 4 hours
inand
battery
condition
the
panel
mountingfor
6 loop
micro
processor
analog
addressable
control
panel
expandable
byfixing
minimum
detailed
specifications.
(Makes:
Notifier
/ Edwards).
panel
shall
be capable
beeing
integrated
with
the
BMSmounting
system
shall
include
costoperating
of supply,
volts
A
C
Power
supply,
automatic
battery
charger,
24V
SLA and
batteries
suitable for
the
Supply,
Installation,
testing
and
of wall
4
loop
micro
based
analog
loop
Micro
processor
based
Fire commissioning
Alarm
control/ strobes
panel
zonal4 shall
indictions
and processor
battery
back
up
as with
per
shall
have suitable
amplifiers
for hooter
the
panel
be capable
beeing
integrated
2 additional
loops power
with
minimum
80
character
LCD with
display
access
levels
1000
events,
historical
installation
ofincluding
any additional
modules
orminimum
interfaces
required loops
for
same.
The
panel
shall
entire
system
tack expandable
back
units by
and
the hooters/strobes
for the
awith
minimum
of80
4
hours
in
addressable
fire
control
panel
2 additional
minimum
character
detailed
specifications.(Makes:
Siemens
/ Morley
/ Bosch).
the
BMSInstallation,
systemE-PROM,
andtesting
shall 240
include
cost
of supply,
installation
of micro
any
additional
modules
or
logging,
flash
volts
A C
Power
supply,
automatic
battery
charger,
24V based
SLA
batteries
Supply,
and
commissioning
of
wall
mounting
4
loop
processor
analog
be completed
as per
specification
and
as required
fixing
8
loop
Micro
processor
based
Fire
battery
condition
the the
panel
shall
suitable
power
amplifiers
for
hooter
/ strobes
panel
shall
LCD
display
4 access
levels
1000 have
events,
historical
logging,
flashofE-PROM,
240
volts
ACthe
Power
supply,
interfaces
required
for entire
the system
same. including
The bypanel
completed
as per
theminimum
specification
and as
suitable
for operating
the
tackshall
back2be
units
and the
hooters/strobes
for a80
minimum
of
addressable
firepanel
control
panel
expandable
minimum
additional
loops
withdetailed
character
Alarm
control
with
zonal
indictions
and
battery
back
up
as
per
specifications.
be
capable
beeing
integrated
with
the BMS
system
and
shall
include
costincluding
ofbased
supply,
automatic
battery
charger,
24V
SLA
batteries
suitable
for operating
the
entire
system
tack
back
Supply,
Installation,
testing
and
commissioning
of Alarm
wall
mounting
2 loop
micro
processor
analog
required
fixing
of
loop
Micro
based
Fire
controlamplifiers
panel
with
indictions
4
hours
in
battery
condition
theprocessor
panel
shall
have
suitable
power
forzonal
hooter
/ strobes
panel
LCD
display
4 8access
levels
1000 events,
historical
logging,
flash
E-PROM,
240
volts and
A the
C battery
Power
(Makes:
/any
Edwards).
installation
of
additional
modules
or by
required
for the
same.
The
panel
shall
units
andNotifier
the fire
hooters/strobes
for aexpandable
minimum of
4interfaces
hours
in battery
condition
the
panel
shall
have
suitable
addressable
control
panel
minimum
2/ Bosch).
additional
loops
with
minimum
80
back be
upautomatic
as
per detailed
specifications.(Makes:
Siemens
/and
Morley
shall
capable
beeing
integrated
with
BMS
system
shall
cost
of
supply,
installation
supply,
battery
charger,
24Vthe
SLA
batteries
suitable
forinclude
operating
the processor
entire
system
including
Supply,
Installation,
testing
and commissioning
of wall
mounting
2
micro
based
analog
be completed
per
the4 specification
asshall
required
fixing beeing
of
6 loop
loop
MicroE-PROM,
processor
based
Fire
power
amplifiers
for
hooter
/ strobes
the and
panel
be capable
integrated
with the 240
BMS
system
character
LCDasdisplay
access
levels
1000
events,
historical
logging,
flash
volts
AC
of back
any units
additional
modules
or interfaces
required
for4 hours
the 2same.
Thecondition
panel
shall
completed
as
tack
the
hooters/strobes
for a minimum
of
inadditional
battery
the be
panel
shall have
addressable
fireand
control
panel
expandable
by minimum
loops
with
minimum
80
Alarm
control
panel
zonal
indictions
and
battery
back
upor as
detailed
and
shall
include
cost
ofwith
supply,
installation
of
any
additional
modules
interfaces
required
for theanalog
same.
Power
supply,
automatic
battery
charger,
24V
SLA
batteries
suitable
forper
operating
thespecifications.
entire
system
Supply,
Installation,
testing
and
commissioning
wall
mounting
1 loop
micro
based
per the specification
and 4as
required
of the
6ofloop
Micro
processor
based
Fireprocessor
Alarm control
panel
with
suitable
power
amplifiers
foraccess
hooterlevels
/ fixing
strobes
panel
shall
be capable
beeing
integrated
with
the BMS
character
LCD
display
1000
events,
historical
logging,
flash
E-PROM,
240
volts
A
C
(Makes:
Notifier
/ control
Edwards).
The
panel
shall
be
completed
ashooters/strobes
per
the specification
and as 2required
fixing
of 4 loop
Micro
processor
including
tack
back
units
and
the
forminimum
a minimum
ofadditional
4 hours
inloops
battery
condition
the panel
addressable
fire
panel
expandable
by
minimum
80
zonal indictions
and
battery
back
as per
detailed
specifications.
(Makes:
Siemens
/with
Morley
/ required
Bosch).
system
and
shall
include
cost
of up
supply,
installation
ofbatteries
any
additional
modules
orprocessor
interfaces
for
Power
supply,
automatic
battery
charger,
24V SLA
suitable
formicro
operating
the entire
system
Supply,
Installation,
testing
and
commissioning
of
wall
mounting
1
loop
based
analog
basedhave
Firesuitable
Alarm
control
withfor
zonal
indictions
and
back
uplogging,
as per detailed
specifications.
shall
power panel
amplifiers
hooter
/1000
strobes
thebattery
panel
shall be
capable
beeing E-PROM,
integrated
with
character
LCD display
4 access
levels
events,
historical
flash
240
the same.tack
The
panel
shall
bethe
completed
as by
perminimum
the
as required
fixing
of 80
4 loop
Micro
including
back
units
and
hooters/strobes
for aspecification
minimum
ofand
4 hours
inwith
battery
condition
the
panel
addressable
fire
control
panel
expandable
2 additional
loops
minimum
character
(Makes:
Notifier
/ Edwards).
the BMS
system
and
shall automatic
include
cost
of charger,
supply,
installation
of addressable
any
additional
modules
or
volts
A Installation,
C
Power
supply,
battery
24V
SLA
batteries
suitable
for
operating
the
Supply,
testing
and
commissioning
of
intellegent
analogue
Repeater
panel
processor
based
Fire
Alarm
control
with
zonal
indictions
and be
battery
up
per detailed
shall
have suitable
power
amplifiers
forpanel
hooter
/ strobes
the
panel
capable
beeing
integrated
with
LCD
display
4 access
levels
1000
events,
historical
logging,
flash shall
E-PROM,
240back
volts
A Cas
Power
supply,
interfaces
required
for
the
The and
panelthe
shall
be
completed
as as
per
the specification
and as
entire
system
including
tack same.
back
units
hooters/strobes
for
a required.
minimum
of 4 hours
in/
including
the
cost
of
mounting
accessories
complete
as
per
specification
(Makes:
Notifier
specifications.
(Makes:
Siemens
/ commissioning
Morley
the
BMSInstallation,
system
and
shall
include
cost/ Bosch).
ofsuitable
supply,
installation
anysystem
additional
modules
or
automatic
battery
charger,
24V
batteries
for operating
theof
entire
including
tackpanel
back
Supply,
testing
andSLA
of intellegent
analogue
addressable
requiredcondition
fixing of 2the
loop
Micro
processor
based Fire
Alarm
control
panel
with/ strobes
zonal Repeater
indictions
and
battery
panel
shall
have suitable
power
amplifiers
for
hooter
the panel shall
Edwards).
interfaces
required
for the for
same.
Thecomplete
panel
shall
completed
asasper
the specification
and as
units
and the
the
hooters/strobes
a minimum
of
4 hours
inbe
battery
condition
therequired.
panel
shall
haveSiemens
suitable
including
cost
of mounting
accessories
as per
specification
(Makes:
battery
back
up as
detailed
specifications.(Makes:
Notifier
/ Edwards).
be
capable
beeing
integrated
with
themounting
BMS system
and
include
cost
of of supply,
Supply
and
fixing
ofper
addressable
wall
cumshall
hooters
including
the cost
mounting
required
fixing
of for
2 loop
Micro
processor
Fire strobes
Alarm
control
panel integrated
with
zonal with
indictions
and
battery
power
amplifiers
hooter
/ strobes
the based
panel shall
be capable
beeing
the BMS
system
/ Morley/
Bosch).
installation complete
of any additional
modules or and
interfaces
required
for the
same.
panel shall
accessories
as per specifications
as
required
including
testing
andThe
commissioning.
backshall
upand
as
per
detailed
specifications.(Makes:
Siemens
/ Morley
/hooters
Bosch).
and
include
cost
of
supply, installation
of any
additional
modules
or interfaces
required
for
the
same.
Supply
fixing
of
addressable
wall
mounting
strobes
cum
including
the
cost
of
mounting
be completed
per the specification and as required fixing of 1 loop Micro processor based Fire
(Makes:
Notifieras
/ Edwards).
The panel shall
be completed
as per the specification
andincluding
as required
fixing
of commissioning.
1 loop Micro processor
accessories
complete
as
per
specifications
and
as
required
testing
and
(Makes:
Alarm control
panel with
zonal indictions
andmanual
batterycall
back up with
as per
detailed
specifications.
Supply
andAlarm
installation
addressable
analogue
resetable
flexible
element to
based Fire
controlofpanel
with zonal
indictions
and batterypoint
back up as
per detailed
specifications.
Siemens
/ Morley /Bosch).
(Makes:
Notifier
Edwards).
initiate
alaram
including
the
cost
of
mounting
accessories
etc.complete.(Makes:
Notifier
/
Edwards).
(Makes:and
Siemens
/ Morley
Bosch).
Supply
installation
of / addressable
analogue manual call point with resetable flexible element to
initiate alaram including the cost of mounting accessories etc. complete. (Makes: Siemens / Morley /
Supply and instllation of intallegent analogue addressable photo electric smoke detector including cost of
Bosch).
base plate etc., complete as per specification with required fittings and accessories. (Makes: Notifier /
Supply and instllation of intallegent analogue addressable photo electric smoke detector including cost of
Edwards).
base plate etc., complete as per specification with required fittings and accessories. (Makes: Siemens /
Supply and installation of intallegent analogue addressable rate of rise cum fixed temparature heat
Morley / Bosch).
detectors including the cost of base plate. 75mm dia MS outlet box for fixing of the detector base,
Supply and installation of intallegent analogue addressable rate of rise cum fixed temparature heat
mounting accessories etc., complete as per specifications and as required. (Makes: Notifier /Edwards).
detectors including the cost of base plate.75mm dia MS outlet box for fixing of the detector base,
Supply and installation of intalligent analogue addressable multi criterion detectors below false ceiling/on
mounting accessories etc., complete as per specifications and as required. (Makes: Siemens / Morley /
ceiling including the cost of base plate.75mm dia MS outlet box for fixing of the detector base, mounting
Bosch).and installation of intalligent analogue addressable multi criterion detectors below false ceiling/on
Supply
accessories etc., complete as per specifications and as required. (Makes: Notifier / Edwards).
ceiling including the cost of base plate.75mm dia MS outlet box for fixing of the detector base, mounting
Supply and Installation of Intalligent analogue addressable Control Modules including the cost of
accessories etc., complete as per specifications and as required. (Makes:Siemens / Morley / Bosch).
mounting accessories complete as per specifications and as required.(Makes: Notifier / Edwards).
Supply and Installation of Intalligent analogue addressable Control Modules including the cost of
mounting accessories complete as per specifications and as required. (Makes: Siemens / Morley /
Supply and Installation of Intalligent analogue addressable monitor modules including the cost of
Bosch).
mounting accessories complete as per specifications and as required. (Makes: Notifier / Edwards).
Supply and Installation of Intalligent analogue addressable monitor modules including the cost of
mounting accessories complete as per specifications and as required. (Makes: Siemens / Morley /
Supply and Installation of Intalligent analogue addressable fault isolator modules including the cost of
Bosch).
mounting accessories complete as per specifications and complete as required. (Makes: Notifier /
Supply and Installation of Intalligent analogue addressable fault isolator modules including the cost of
Edwards).
mounting accessories complete as per specifications and complete as required. (Makes: Siemens /
CONVENTIONAL - FIRE ALARM SYSTEM
Morley / Bosch).
Supply, Installation, testing and commissioning of conventional Micro processor based Fire Alarm panel
with 2 zone,12V SMF batteries etc., complete with all standard accessories. (Makes: System Censor /
Ravel / Pinnacle)
Supply, Installation, testing and commissioning of conventional Micro rocessor based Fire Alarm panel
with 4 zone, 12V SMF batteries etc., complete with all standard accessories. (Makes: System Censor /
Ravel / Pinnacle)
Supply, Installation, testing and commissioning of conventional Micro processor based Fire Alarm panel
with 6 zone, 12V SMF batteries etc., complete with all standard accessories. (Makes: System
Censor / Ravel / Pinnacle)
Supply, Installation, testing and commissioning of conventional Micro processor based Fire Alarm panel
with 8 zone, 12V SMF batteries etc., complete with all standard accessories. (Makes: System Censor
/ Ravel / Pinnacle)

Supply, Installation, testing and commissioning of conventional Micro processor based Fire Alarm panel
with 10 zone, 12V SMF batteries etc., complete with all standard accessories. (Makes: System Censor /
Ravel / Pinnacle)
Supply, Installation, testing and commissioning of conventional Micro processor based Fire Alarm
panel with
12 zone, 12V SMF batteries etc., complete with all standard accessories. (Makes: System Censor /
Ravel / Pinnacle)
Supply, Installation, testing and commissioning of conventional Micro processor based Fire Alarm
panel with
14 zone, 12V SMF batteries etc., complete with all standard accessories. (Makes: System Censor /
Ravel / Pinnacle)
Supply and installation of Repeater panel including the cost of mounting accessories complete as per
specifications and as required. (Makes: System Censor / Ravel / Pinnacle)
Supply and installation of duel tone electronic hooter of 85dB including the cost of mounting
accessories complete as per specifications and as required.
Supply and installation of dust and vermin proof manual call point to initiate audio visual alarm
including the cost of mounting accessories complete as per specifications and as required.
Supply and installation of response indicators for above false ceiling detectors.

Supply and installation of plug - in type multi criterion detectors including the cost of base
plate. 75mm dia M.S. outlet box for fixing of the detector base. Mounting accessories etc.,
complete as per specifications as required. (Makes: System Censor / Ravel / Pinnacle)
Supply and installation of plug -in type photo electric smoke detectors including the cost of base plate.
75mm dia MS outlet box for fixing of the detector base. Mounting accessories etc complete
and as per specifications and as required. (Makes: System Censor / Ravel / Pinnacle)
Supply and installation of plug -in type rate of rise cum fixed temperature heat detectors including the cost
of base plate.75mm dia MS outlet box for fixing of the detector base, mounting accessories etc., complete
as per specifications and as required. (Makes: System Censor /Ravel /Pinnacle)
FIRE EXTINGUISHERS
Supply and fixing of ABC stored pressure squeeze grip type fire extinguishers, 10 kg capacity, ISI
CE marked Is:13849 filled with ABC Mono Ammonium Phosphate base powder- 90 pressurized
with dry Nitrogen Gas at 15 Kg / sqcm complete with discharge hose and wall mounting
bracket, Insta Alert facility, 2mm Mild Steel, EPDM
Rubbers, Pressure Guage, which work
effectively on all class of fires (A, B, C & Electrical fires) with 5 years warranty (Cease Fire /
Minimax make) Including transportation, all taxes and all labour charges etc complete.

Supply and fixing of ABC stored pressure squeeze grip type fire extinguishers, 10 kg capacity, ISI CE
marked Is:13849 filled with ABC Mono Ammonium Phosphate base powder- 50 pressurized with dry
Nitrogen Gas at 15 Kg / sqcm complete with discharge hose and wall mounting bracket, 2mm Mild
Steel, EPDM Rubbers, Pressure Guage, which work effectively on all class of fires (A, B, C & Electrical
fires) with 2 years warranty (Safex / Kenex / Bharat / Reliance make) Including transportation, all
taxes and all labour charges etc complete.

Supply and fixing of ISI make ABC Power MAP 5 Kg Fire extinguisher Mono ammonium
phosphate power 90, stored pressure type, pressure gauge gross wt. 8 kg, empty wt.3 kg, can
Ht.449mm, Diameter 150mm, Discharge time less than 15 sec, controllable discharge mechanism,
range min. 4 mts applicable on classes A,B, C & electrically started fires, A- rating 144A, B-rating 89B,
can construction: Deep drawn Co2 mig welding, wall construction: Forging & Machining, internal
coating of can: Epoxy power coating, External coating of Can:Epoxy polyster powder coating, sheet
metal thickness:1.80mm, Helium leakage detection tested, insta -alert, ISI & EN approved with 5
years warranty (Cease Fire/ Minimax make) Including transportation, all taxes and all labour charges
etc complete.

Supply and fixing of ISI make ABC Power MAP 5 Kg Fire extinguisher Mono ammonium phosphate
power 90, stored pressure type, pressure gauge gross wt. 8 kg, empty wt.3 kg, can Ht.449mm, Diameter
150mm, Discharge time less than 15 sec, controllable discharge mechanism, range min. 4 mts
applicable on classes A,B, C & electrically started fires, A- rating 144A, B-rating 89B, can construction:
Deep drawn Co2 mig welding, wall construction: Forging & Machining, internal coating of can: Epoxy
power coating, External coating of Can:Epoxy polyster powder coating, sheet metal thickness:1.80mm,
Helium leakage detection tested, ISI & EN approved with 2 years warranty (Safex / Kenex / Bharat /
Reliance make) Including transportation, all taxes and all labour charges etc complete.

Supply and fixing of ISI make ABC Power MAP 2 Kg Fire extinguisher Mono ammonium phosphate
power 90,stored pressure type, pressure gauge gross wt. 8 kg, empty wt.3 kg, can Ht.449mm,
Diameter 150mm, Discharge time less than 15 sec, controllable discharge mechanism, range min. 4
mts applicable on classes A,B, C electrically started fires, A- rating 144A, B-rating 89B, can
construction: Deep drawn
Co2 mig welding, wall construction: Forging & Machining, internal
coating of can: Epoxy power coating, External coating of Can:Epoxy polyster powder coating, sheet
metal thickness:1.80mm, Helium leakage detection tested, insta - alert, ISI & EN approved with 5 years
warranty (Cease Fire/ Minimax make) Including transportation, all taxes and all labour charges etc
complete.

Supply and fixing of ISI make ABC Power MAP 2 Kg Fire extinguisher Mono ammonium phosphate power
50,stored pressure type, pressure gauge gross wt. 8 kg, empty wt.3 kg, can Ht.449mm, Diameter 150mm,
Discharge time less than 15 sec, controllable discharge mechanism, range min.4 mts applicable on
classes A,B, C electrically started fires,A - rating 144A, B-rating 89B, can construction: Deep drawn Co2
mig welding, wall construction: Forging & Machining, internal coating of can: Epoxy power coating,
External coating of Can:Epoxy polyster powder coating, sheet metalthickness :1.80mm, Helium leakage
detection tested, ISI & EN approved with 2 years warranty (Safex / Kenex / Bharat/ Reliance make)
Including transportation, all taxes and all labour charges etc complete.

Supply and fixing of ISI make Ceiling Mounted ABC MAP 90, 5 Kg stored pressure type, pressure
gauge, Gross Wt.7.7 kg, Empty Wt.2.7 kg, Can Ht226mm ,Dia 230mm, Discharge time : less than 8 sec,
Auto discharge mechanis on temperature rise, Applicable on A,B,C, & Electrically -started fires, Can
Construction: Forging & Machining, Internal coating of Can: Epoxy Power coating, External Coating of
Can: Epoxy Polyster powder coating, sheet metal thickness: 1.80mm , Helium leakage detection tested,
Insta -alert, ISI & EN approved with 5 years warranty (Cease Fire / Minimax make) Including
transportation, all taxes and all labour charges etc complete.

Supply and fixing of ISI make Ceiling Mounted ABC MAP 50, 5 Kg stored pressure type, pressure
gauge, Gross Wt.7.7 kg, Empty Wt.2.7 kg, Can Ht226mm , Dia 230mm, Discharge time:less than 8
sec, Auto discharge mechanism on temperature rise, Applicable on A,B,C, & Electrically started fires, Can Construction: Forging & Machining, Internal coating of Can: Epoxy
Power
coating,
External Coating
of Can: Epoxy Polyster powder coating, sheet metal
thickness:1.80mm , Helium leakage detection tested, ISI & EN approved with 2 years warranty
(Safex / Kenex / Bharat / Reliance make) Including transportation, all taxes and all labour charges etc
complete.

Supply and fixing of 2 Kg Fire exitinguisher Clean Agent HFC 236, Zero ODP, Stored pressure type,
pressure guage, gross weight 3.6Kg empty weight 1.6 Kg, can weight 341mm, Diameter 108mm,
discharge time minimum 6 secs,
controllable discharge mechanism, range minimum 2 meters, applicable on class A,B,C and
electrically started Fire, A rating 5A, B rating 34B, can construction: Deep drawn & CO2 mig welded,
Valve construction: Forging & Machining, Internal coating of Can: Epoxy powder coating, External
coating of can: Epoxy polyster powder coating, sheet metal thickness: 1.60 mm, Helium leak
detection tested, 5 Years warranty.(Makes: Ceasefire / Minimax)

Supply and fixing of 4 Kg Fire exitinguisher Clean Agent HFC 236, Zero ODP, Stored pressure type,
pressure guage, gross weight 6.9Kg empty weight 2.9 Kg, can weight 435mm, Diameter 140mm,
discharge time minimum 9 secs, controllable discharge mechanism, range minimum 4 meters, applicable
on class A,B,C and electrically started Fire, A rating 8A, B rating 55B, can construction: Deep drawn &
CO2 mig welded, Valve construction: Forging & Machining, Internal coating of Can: Epoxy powder
coating, External coating of can: Epoxy polyster powder coating, sheet metal thickness: 1.60 mm,
Helium leak detection tested, 5 Years warranty.(Makes: Ceasefire / Minimax)

Supply and fixing of Co2 type Fire Extinguishers 4.5 Kg capacity confirming to IS 2878 made from ISI
marked steam less cylinder confirming to IS:7285 & CE certified and fitted with ISI marked controlled
valve confirming to IS:3224, high pressure 1 Mtr discharge hose & horn complete with initial gas
charged with carrying handle with wheels and wall mounting bracket. Squeeze lever discharge, used unused indicator, Aphoxy coated paint (Red) with 93% gloss with
2 years warranty (Cease
Fire/Minimax make) Including transportation, all taxes and all labour charges etc complete.

Supply and fixing of Co2 type Fire Extinguishers 4.5 Kg capacity confirming to IS 2878 made from ISI
marked steam less cylinder confirming to IS:7285 & CE certified and fitted with ISI marked controlled
valve confirming to IS:3224, high pressure 1 Mtr discharge hose & horn complete with initial gas charged
with carrying handle with wheels and wall mounting bracket. Squeeze lever discharge, used un- used
indicator, Aphoxy coated paint (Red) with 93% gloss with 2 years warranty (Safex / Kenex / Bharat/
Reliance make) Including transportation, all taxes and all labour charges etc complete.

Supply and fixing of DCP powder type cylindrical shape fire extinguisher 2 Kg with fixing hangers, hose,
brackets,screws to required size etc., complete as per IS:13849 - wall mounted type. (Makes:
Minimax /Safex / Kenex /Reliance)
Supply and fixing of DCP powder type cylindrical shape fire extinguisher 5 Kg with fixing hangers, hose,
brackets, screws to required size etc.,complete as per IS:13849 - wall mounted type. (Makes: Minimax /
Safex /Kenex / Reliance)
Supply and fixing of DCP powder type cylindrical shape fire extinguisher 10 Kg with fixing hangers, hose,
brackets, screws to required size etc., complete as per IS:13849 - wall mounted type. (Makes:
Minimax /Safex/Kenex / Reliance)

Supply and fixing of Escape signage boards in Rigid Photo luminecent based glow in Dark rigid sheet with
high intensity luminous properties with specificaiton of Cease Fire or its equivalent make Model-1ES01
Supply and fixing of Cease fire or
its equivalent Escape
gear Mild Steel box
size
425mmx360mmx140mm Epoxy powder coated to protect it from Weathering , smoke hood tested to
Eupropean Standard EN 403 1993-S known to reduce Carbon Monoxide, propend(acrloein),
hydrogen chloride, hydrogen Cyanide and Solid and liquid toxic particles to manageable level for
atleast 15 minutes shall with stand tempeartures upto 80 degrees single use only Fire Blanket size
1.2m x1.8m used to cover any vessel containing used to Extinguish a clothing fire wrap blanket around
the victim.

Supply and fixing of 4Nos of 9 Ltrs capacity round bottom sand buckets along with bucket sand,
Fire buckets with round bottom type enamel painted, white inside & red out side and letter FIRE
inblack out side & Handle with mounting bracket.
Supply anmd fixing of Fire bucket stand fabricated by M.S. angles to install for two numbers of
buckets as per local fire officers standards.
FIRE HYDRANT AND SPRINKLER SYSTEM
Supplying, installation, testing and commissioning of electric driven main fire pump suitable for automatic
operation and consisting of following complete in allrespect as required
a) Horizontal type, multistage, centrifugal, split casing pump of cast iron body & bronze impeller with
stainless steel shaft, mechanical seal to ensure a minimum pressure of 3.5Kg / sq.cm. at highest and
farthest outlet at specified flow of 1620 lpm at 56 Mtr. head conforming to IS 1520
b)Suitable HP SQ cage induction motor, TEFC, synchronous speed 1500 RPM, suitable for operation on
415Volts, 3 phase 50 Hz. AC with IP 55 protection for enclosure, horizontal foot mounted type with
Class-'F' insulation, conforming to IS 325
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Pumps:
Kirloskar
/
Mather&Platt. Makes of Motors: Siemens/ ABB/ Kirloskar
Supplying , installation, testing and commissioning of electric driven main fire pump suitable for automatic
operation and consisting of following : complete in all respect as required
a) Horizontal type, multistage, centrifugal, split casing pump of cast iron body & bronze impeller with
stainless steel shaft, mechanical seal to ensure a minimum pressure of 3.5 Kg / sq.cm. at highest
and farthest outlet at specified flow of 2280 lpm at 70 Mtr. head conforming to IS 1520
b)Suitable HP SQ cage induction motor, TEFC, synchronous speed 1500 RPM, suitable for operation on
415Volts, 3 phase 50 Hz. AC with IP 55 protection for enclosure, horizontal foot mounted type with
Class-'F' insulation, conforming to IS-325
c)M.S. Fabricated common base plate, coupling, coupling guard,foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Pumps:
Kirloskar / Mather & Platt. Makes of Motors: Siemens/ ABB/ Kirloskar
Supplying ,installation, testing and commissioning of electric driven main fire pump suitable for automatic
operation and consisting of following: complete in all respect as required.
a) Horizontal type, multistage, centrifugal, split casing pump of cast iron body & bronze impeller with
stainless steel shaft, mechanical seal to ensure a minimum pressure of 3.5 Kg / sq.cm. at highest and
farthest outlet at specified flow of 2850 lpm at 70 Mtr. head conforming to IS 1520

b) Suitable HP SQ cage induction motor, TEFC, synchronous speed 1500 RPM, suitable for operation
on 415Volts,3 phase 50 Hz. AC with IP 55 protection for enclosure, horizontal foot mounted type with
Class-'F' insulation,conforming to IS-325
c) M.S. Fabricated common base plate,coupling,coupling guard, foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Pumps:
Kirloskar/Mather & Platt. Makes of Motors: Siemens/ ABB/ Kirloskar
Supplying,installation,Testing and commissioning of diesel engine driven main fire pump suitable for
automatic operation and consisting of following :complete in all respect as required
a) Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal to ensure a minimum pressure of 3.5 Kg / sq.cm. at highest and farthest
outlet at specified flow of 1620 lpm at 56 Mtr head conforming to IS 1520
b) Suitable HP, 1500 RPM water cooled with radiator, diesel engine conforming to relevant BS & IS
standard complete with auto starting mechanism, 12 Volts / 24 Volts electric starting equipment, Diesel
Tank, exhaust pipe extended upto 1 m. outside pump house duly insulated with 50mm thick glass wool
with 1.0mm thick alluminium sheet cladding, residential silencer, instruments and protection as per
specification, stop solenoid for auto stop in the event of fault with audio indications, painted with post
office red colour etc as required.

c) M.S.Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Engines :
Kirloskar / Cummins. Makes of Pumps : Kirloskar / Mather&Platt
Supplying , installation, Testing and commissioning of diesel engine driven main fire pump suitable for
automatic operation and consisting of following : complete in all respect as required
a) Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal to ensure a minimum pressure of 3.5 Kg / sq.cm.at highest and farthest outlet at
specified flow of 2280 lpm at 70 Mtr head conforming to IS 1520
b)Suitable HP, 1500 RPM water cooled with radiator, diesel engine conforming to relevant BS & IS
standard complete with auto starting mechanism, 12 Volts / 24 Volts electric starting equipment, Diesel
Tank, exhaust pipe extended upto 1 m. outside pump house duly insulated with 50mm thick glass wool
with 1.0mm thick alluminium sheet cladding,
residential silencer, instruments and protection as per
specification, stop solenoid for auto stop in the event of fault with audio indications, painted with post
office red colour etc as required.

c) M.S.Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of
Kirloskar / Cummins. Makes of Pumps : Kirloskar / Mather&Platt

Engines :

Supplying , installation, Testing and commissioning of diesel engine driven main fire pump suitable
for automatic operation and consisting of following : complete in all respect as required
a)Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal to ensure a minimum pressure of 3.5 Kg /sq.cm. at highest and farthest outlet at
specified flow of 2850 lpm at 70 Mtr head conforming to IS 1520

b)Suitable HP, 1500 RPM water cooled with radiator, diesel engine conforming to relevant BS & IS
standard complete with auto starting mechanism, 12 Volts / 24 Volts electric starting equipment, Diesel
Tank, exhaust pipe extended upto 1 m. outside pump house duly insulated with 50mm thick glass wool
with 1.0mm thick alluminium sheet cladding,
residential silencer, instruments and protection as per
specification, stop solenoid for auto stop in the event of fault with audio indications, painted with post
office red colour etc as required.

c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d)Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Engines :
Kirloskar /Cummins. Makes of Pumps : Kirloskar / Mather&Platt
Supplying,installation,testing andcommissioning of electric driven mainfire pump suitable for automatic
operation and consisting of following : completein all respect as required
a) End suction back pull out centrifugal pump, Std fitted with BRONZE IMPELLER & gland packing
,capacity 171 Cum/hr (2850 LPM) at total head 70 M at operating speed 2900 rpm. Pump duty as per
TAC
b) 55 KW /75 HP, 3000 srpm,TEFC (IP55) horizontal foot mounted, squirrel cage induction motor,
suitable for 415
volts +/- 10%, 3 Ph, 50 Hz +/-5%, a.c.supply. Class F insulated and suitable for ambient temperature
up to 50 deg C. Motor in frame SC 250 M frame for driving above pump.
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d)Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Pumps:
Kirloskar / Mather & Platt. Makes of Motors: Siemens/ ABB/ Kirloskar
Supplying ,installation,Testing and commissioning of diesel engine driven main fire pump suitable for
automatic operation and consisting of following : complete in all respect as required
a) End suction back pull out pump, Std fitted with BRONZE Impeller & gland packing, capable of
delivering 171 Cum/hr (2850 LPM) at a total head of 70 M when operated at 1800 rpm and pump duty as
per TAC
b)Liquid cooled, 85 BHP at 1800 rpm, diesel engine (Radiator cooled) 12 Volts starting system with
standard accessories
c)M.S. Fabricated common base plate,coupling, coupling guard, foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Engines :
Kirloskar /
Cummins. Makes of Pumps : Kirloskar / Mather&Platt
Supplying , installation ,testing and commissioning of electric driven main fire pump suitable for automatic
operation and consisting of following : complete in all respect as required
a)End suction back pull out centrifugal pump, Std fitted with BRONZE IMPELLER & gland packing
,capacity 137 Cum/hr (2280 LPM) at total head 70 mwc at operating speed 2900 rpm. Pump duty as per
TAC
b) 45KW / 60 HP, 3000 srpm, TEFC (IP55) Horizontal foot mounted, squirrel cage induction motor,
suitable for 415
volts +/- 10%, 3 Ph, 50 Hz +/-5%, a.c.supply. Class F insulated and suitable for ambient
temperature up to 50 deg C. Motor in frame SC 225 M frame
c) M.S.Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Pumps:
Kirloskar / Mather & Platt. Makes of Motors: Siemens/ ABB/ Kirloskar

Supplying, installation,Testing and commissioning of diesel engine driven main fire pump suitable for
automatic operation and consisting of following : complete in all respect as required
a)End suction back pull out pump, Std fitted with BRONZE Impeller & gland packing, capable of
delivering 137 Cum/hr (2280 LPM) at a total head of 70 M when operated at 2150 rpm and pump duty as
per TAC
b) Liquid cooled, 68 BHP at 1800 rpm, Diesel engine (Radiator cooled) 12 Volts starting system with
standard accessories
c) M.S.Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d)Suitable cement concrete foundation duly plastered with ant vibration pads. Makes of Engines :
Kirloskar / Cummins.
Makes of Pumps : Kirloskar / Mather&Platt
Supplying, installation,Testing and commissioning of diesel engine driven main fire pump suitable for
automatic operation and consisting of following : complete in all respect as required
a) End suction back pull out centrifugal pump, Std fitted with BRONZE IMPELLER & gland packing
,capacity 97 Cum/hr (1620 LPM) at total head 56 mwc at operating speed 2900 rpm.Pump duty as per
TAC
b) 30 KW / 40 HP,3000 srpm, TEFC (IP55) horizontal foot mounted, squirrel cage induction motor,
suitable for 415
volts +/- 10%, 3 Ph, 50 Hz +/-5%, a.c.supply. Class 'F insulated and suitable for ambient temperature up
to 50
deg C. Motor in frame SC 250 M frame for driving above pump.
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d) Suitable cement concrete
foundation duly plastered with anti vibration
Pumps:Kirloskar / Mather & Platt. Makes of Motors: Siemens/ ABB/ Kirloskar

pads. Makes of

Supplying , installation, Testing and commissioning of diesel engine driven main fire pump suitable
for automatic operation and consisting of following : complete in all respect as required
a)End suction back pull out pump, Std fitted with BRONZE Impeller & gland packing, capable of delivering
97 Cum/hr (1620 LPM) at a total head of 56 M when operated at 2150 rpm and pump duty as per TAC
b)Liquid cooled, 50 BHP at 1800 rpm, Diesel engine (Radiator cooled) 12 Volts starting system with
standard accessories
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Engines :
Kirloskar /Cummins. Makes of Pumps : Kirloskar / Mather&Platt
Supplying , installation , testing and commissioning of electric driven pressurisation / Jockey pump
suitable for automatic operation and consisting of following : complete in all respect as required
a) Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal and flow of 180 lpm at 56 Mtr head conforming to IS 1520
b)Suitable HP SQ cage induction motor TEFC type suitable for operation on 415Volts, 3 phase 50 Hz. AC
with IP 55 class of protection for enclosure, horizontal foot mounted type with Class-'F' insulation,
conforming to IS-325
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d) Suitable cement concrete foundation duly plastered with anti vibration pads.Makes of Pumps :
Kirloskar / Mather &Platt. Makes of Motors : Siemens/ ABB/ Kirloskar

Supplying , installation , testing and commissioning of electric driven pressurisation / Jockey pump
suitable for automatic operation and consisting of following : complete in all respect as required
a) Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel
shaft,
conforming to IS 1520
b) Suitable HP SQ cage induction motor TEFC type suitable for operation on 415Volts, 3 phase 50 Hz.
AC with IP 55
class of protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS325
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.
d)Suitable cement concrete foundation duly plastered with anti vibration pads. Makes of Pumps :
Kirloskar / Mather&Platt. Makes of Motors : Siemens/ ABB/ Kirloskar
Supplying, installation, testing and commissioning of electric driven Terrace / Booster pump suitable for
automatic operation and consisting of following : complete in all respect as required.

a) Horizontal type, multistage, centrifugal pump of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal and flow of 900 lpm at 45 Mtr head conforming to IS 1520

b) Suitable HP SQ cage induction motor TEFC type suitable for operation on 415Volts, 3 phase 50 Hz.
AC with IP 55 class of protection for enclosure, horizontal foot mounted type with Class-'F' insulation,
conforming to IS-325
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.

d) Suitable cement concrete foundation duly plastered with anti vibration pads.
Makes of Pumps : Kirloskar / Mather&Platt.
Makes of Motors : Siemens / ABB / Kirloskar
Supplying , installation, testing and commissioning of electric driven Terrace / Mono Bloc Booster pump
suitable for automatic operation and consisting of following : complete in all respect as required.

a) Horizontal type,centrifugal End Suction pump of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal and flow of 900 lpm at 45 Mtr head conforming to IS 1520

b) Three Phase High Speed Centrifugal Pump. Pump with CI Impeller and Gland Packing with 9.3 KW /
12.5HP, 2 pole, TEFC, 415 V, 3ph motor
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.

d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes : Kirloskar

Supplying, installation,testing and commissioning of electric driven Terrace / Mono Bloc Booster pump
suitable for automatic operation and consisting of following : complete in all respect as required.

a) Horizontal type, centrifugal End Suction pump of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal and flow of 750 lpm at 35 Mtr head conforming toIS 1520

b) Three Phase High Speed Centrifugal Pump. Pump with CI Impeller and Gland Packing with 7.5 KW /
10 HP, 2 pole, TEFC, 415 V, 3ph motor
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.

d) Suitable cement concrete foundation duly plastered with anti vibration pads.Makes : Kirloskar

Supplying, installation, testing and commissioning of electric driven Terrace / Mono Bloc Booster pump
suitable for automatic operation and consisting of following : complete in all respect as required.

a) Horizontal type, centrifugal End Suction pump of cast iron body & bronze impeller with stainless steel
shaft, mechanical seal and flow of 450 lpm at 35 Mtr head conforming to IS 1520

b) Three Phase High Speed Centrifugal Pump. Pump with CI Impeller and Gland Packing with 5 KW / 7.5
HP, 2 pole, TEFC, 415 V, 3ph motor
c) M.S. Fabricated common base plate, coupling, coupling guard, foundation bolts etc as required.

d) Suitable cement concrete foundation duly plastered with anti vibration pads. Makes : Kirloskar

Providing , laying, testing & Commissioning of following classes MS pipes conforming to IS 3589 and
1239 including fittings like elbows, tees, flanges, tapers, nuts, bolts, gaskets etc., complete. Makes: Jindal / Hissar / Tata pipes

(a) 250 mm dia


(a) 200 mm dia 'C' Class
(b) 200 mm dia 'B' Class
(c) 150 mm dia 'C' Class
(d) 150 mm dia 'B' Class
(e) 100 mm dia 'C' Class
(f) 100 mm dia 'B' Class
(g) 80 mm dia 'C' Class
(h) 80 mm dia 'B' Class
(i) 65 mm dia 'C' Class
(j) 65 mm dia 'B' Class
(k) 50 mm dia 'C' Class
(l) 50 mm dia 'B' Class
(h) 40 mm dia

(m) 32 mm dia 'C' Class


(n) 32 mm dia 'B' Class
(o) 25 mm dia 'C' Class
(p) 25 mm dia 'B' Class
Supplying and fixing single headed Internal / External hydrant valve with instantaneous Gun metal
couplings of 63mm dia with Cast iron wheel ISI marked conforming to IS 5290 (Type -A) with blank
Gun Metal cap and chain as required. Makes:Audco / Kirloskar / BDK /H Shankar/ Leader/ Zolotto/
Intervalve.

Supplying, fixing, testing and commissioning of butterfly valve PN 1.6, with Bronze / Gun metal seat
duly ISI marked complete with Nuts, Bolts, Washers, gaskets, conforming to IS 13095 of following sizes
as required. Makes:Audco / Kirloskar / BDK /H Shankar/ Leader/ Zolotto / Intervalve.

(a) 250 mm . dia


(a) 200 mm . dia
(b) 150 mm dia
(c) 100 mm dia
(d) 80 mm dia
Providing, installation, testing and commissioning of dual plate non - return valve of following sizes
confirming to IS: 5312 complete with rubber gasket, GI bolts , nuts, washers etc as required Makes:Audco
/ Kirloskar / BDK / H Shankar / Leader / Zolotto / Intervalve.

(a) 200 mm dia


(b) 150 mm dia
(c) 100 mm dia
(d) 80 mm dia
(f) 50 mm dia
Providing, installation, testing and commissioning of dual plate non - return valve of following sizes
confirming to IS: 5312 complete with rubber gasket, GI bolts , nuts, washers etc as required Makes:Audco
/ Kirloskar / BDK / H Shankar / Leader / Zolotto / Intervalve.

(a) 250 mm . dia


(b) 200 mm . dia
(c) 150 mm dia
(d) 100 mm dia
(e) 80 mm dia
(f) 50 mm dia

Manufacture, Supply and delivery of CI Wafer Lug type Butterfly Valves conforming to IS 13095/1991
(Reaffirmed 1998) excluding transportation, CED and taxes etc., complete. Operation done with worm
actuator ISI marked Rate at Ex-Factory Makes:Audco / Kirloskar / BDK /H Shankar/ Leader/ Zolotto /
Intervalve.

(a) 50 mm dia
(b) 40 mm dia
(c) 32 mm dia
Deleted From SOR 11-12 ELEC-2.2.7
Supplying and fixing 63mm dia, 15 mtr long RRL hose pipe with 63mm dia Male and Female Gun
metal / SS couplings duly binded with GI wire, rivets etc conforming to IS 636 (Type -A) as
required. Make: Newage/ Winco/ Padmini
Supplying and fixing 63mm dia, 15 mtr long CP hose pipe with 63mm dia Male and Female Gun metal /
SS couplings duly binded with GI wire, rivets etc conforming to IS 636 (Type -A) as required. Make:
Newage/ Winco/ Padmini
Supplying and fixing First -Aid Hose Reel with MS construction spray painted in Post office Red,
Conforming to Is 884 with upto date amendments, complete with the following as required.

a) 36.6 Mtr Long 20mm (Nominal internal) dia water hose Thermoplastic / Textile reinforced / Rubber
braided / Polypropylene Type - 2 as per IS:12585 Make: Eversafe/ Reliance/ Newage/ SRI

b) 20mm (Nominal internal) dia gun metal globe valve and nozzle. Make: Newage/ Winco/ Padmini

c) Drum and brackets for fixing the equipments on wall.


d) Connections from riser with 25mm dia stop valve (gun metal) & MS pipe.
Supplying and fixing of hose cabinet of size 750mm X 600mm x 250mm made of No 16 gauge SWG
CRCA sheet with 6mm thick glazed glass door including necessary locking arrangement suitable to
accommodate 2 Nos 15 mtr long Hose pipe, 1 No branch pipe, mounted on wall OR raised brick platform
and duly painted with Post office red externally and white internally with synthetic enamel paint complete
in all respect, for external hydrant as required.

Supply and fixing 63mm dia Gun metal branch pipe with 20mm (Nominal internal diameter) size Gun
metal / SS nozzle conforming to IS 903, suitable for instantaneous connection to interconnect hose pipe
coupling as required. Make: Newage/ Winco/ Padmini

Supply and fixing 4 way fire brigade connection of cast iron body with 4 Nos
Gun metal
Male
instantaneous inlet couplings complete with cap and chain as required for 150mm dia MS pipe
connection, conforming to IS 904 as required.

Supply and fixing 2 way fire brigade connection of cast iron body with 2 Nos
Gun metal
Male
instantaneous inlet couplings complete with cap and chain as required for 100mm dia MS pipe
connection, conforming to IS 904 as
required.

Supply and fixing air vessel made of 250 mm dia, 8 mm thick MS sheet, 1200mm in height with air release
valve on top and flanged connection to riser, drain arrangement with 25mm dia Gun metal wheel valve,
with required accessories, pressure gauge and painting with synthetic enamel paint of approved shade as
required.

Providing fixing, testing and commissioning of 15mm size quartzoid bulb type sprinklers of rating 68 C.
pendent / side
wall with required accessories. Makes: HD / TYCO / VIKING / NEWAGE/ SHARP

Providing and fixing of Pressure Switch in the MS pipe Line including connection etc as required. Make :
Danfoss / Indfoss / Approved makes
Providing and fixing Flow Switches in 100mm dia MS pipe. Makes : System Sensor / Switzer / Approved
makes
Providing and fixing Flow Switches in 150 mm dia MS pipe. Makes : System Sensor / Switzer / Approved
makes
Supply, installation, testing and commissioning of Bourden type, stainless steel dial type pressure gauge
with isolation valve and pipe having calibration of 0-16 kg/cm2. MAKE: HGURU/FIEBIG and Approved
makes
Supply, installation, testing and commissioning of 25mm dia Gate valve Makes : Zoloto / Leader /
Approved makes
Supply, installation, testing and commissioning of 25mm dia Ball valve Makes : Zoloto / Leader / Approved
makes
Supply, installation, testing and commissioning of

25 / 20mm dia Air Release Valve

Providing, fixing, testing, commissioning of installation control valve of Cast iron body and brass / Bronze
working parts comprising of water, motor alarm, bronze seat clapper, and clapper arm, hydraulically
driven mechanical gong bell to sound continuous alarm when the Wet riser / Sprinkler system activates,
pressure gauges, emergency releases, strainer, pressure switch, cock valve complete with drain valve
and bypass , test control box, ball valves, Ms pipe of required size, flanges, orifice plate, gasket etc of size
150mm dia as required. Makes : HD / TYCO / NEWAGE

Supplying, installing, testing and commissioning approved make CI body Foot Valve with brass strainer
with necessary flanges, nuts and bolts etc., complete on to the suction line.Rate as per the lowest
quotation of Bharat Fire Safety Engineers.Makes:Normex & approved makes

a) 200mm nominal dia


b) 150mm nominal dia
c) 100mm nominal dia
d) 80mm nominal dia

Supply and laying of 300mm dia NP2 RCC Hume pipe with Collars for Road crossings

Supplying and wrapping the anticorrosive material for buried pipes with coating of Primer and
wrapping with 4 mm thick polymer corrosion resistant tape as per IS : 10221 with 15 mm overlap as per
specificatios.
a) 150mm nominal dia
b) 100mm nominal dia
c) 80mm nominal dia
Supply, fabricating , installing structural steel supports for fixing all sizes of MS pipes from ceiling / wall
with MS Channels, Angles, Flats, Rods, as required at site with anchor fasteners, Clamps, threaded
rods, nuts, bolts,washers etc complete with painting.

Supply of 4 Core x 1.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal/ CCI /Unicab /Polycab /Finolex /KEI / Havells.

Supply of 4 Core x 2.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal/ CCI /Unicab/Polycab / Finolex / KEI / Havells.

Supply of 8 Core x 2.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal /CCI /Unicab / Polycab / Finolex /KEI / Havells.

Supply of 10 Core x 1.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal/CCI / Unicab /Polycab /Finolex /KEI /Havells.

GENERATORS SPECIFICATION
Supply, Transportation, erection and
commissioning (Excluding Foundation) of 3 Phase, 415, 50Hz,
water cooled multi cylinder diesel generator set with alternator of - - - KVA/ - - - - - KW out put contineous
rating directly coupled Engine and Alternator with guard and mounted on a common base plate of Robust
construction and complete without control panel having IP-52 protection, Acoustic Enclosure as per CPCB
norms , sound absorbing material, t to restrict sound level up to 75 dB up to 1 mtr distance and as per
CPCB norms etc as per following specifications mentioned below.

A. Alternator : Kirloskar / Stamford / Crompton Greaves make. The alternator of the output rating shall be
3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self regulated, and
shall confirm to IS: 13364 of 1992 with regulation of +5% from no load to full load. degree of protections
shall be IP21.

B.Diesel Engine : Kirloskar / Cummins / Ashok ley land / Mahindra Diesel Engine start, developing
suitable -------------- BHP output at 1500 RPM with class A2 Governing so as to enable the alternator to
give - - - - -KVA continuous output at 0.8 P.F. lagging at NTP conditions. The diesel engine shall be
capable of providing 10% O/L for 1 Hr for every 11 Hrs of continuous running at full load. The engine with
1st filling of oil and Diesel etc.
01. Exhaust pipe of required size and length with insulation or clading.
02. Diesel tank suitable for 8 to 12 Hours running capacity.
03. Residential Silencer.
04. SMF Batteries with leads as per the Manufacturer
standards

Deleted SOR 11-12 ELEC-10.1.1


15KVA, 3 Phase, 415, 50Hz, 19BHP, water cooled multi
cylinder diesel generator set with alternator of 15 KVA out
put continous rating at 0.8 p.f, Batteries .
30KVA, 3 Phase, 415, 50Hz,
40 to 42 BHP, water cooled multi cylinder diesel generator set with
alternator of 30KVA
out put continous rating at 0.8 p.f, Batteries.
40KVA, 3 Phase, 415, 50Hz, 56BHP, water cooled multi cylinder diesel generator set with alternator of
40 KVA out put continous rating at 0.8 p.f, and Batteries .

Supply, Transportation, erection and


commissioning (Excluding Foundation) of 3 Phase, 415, 50Hz,
water cooled multi cylinder diesel generator set with alternator of - - - KVA/ - - - - - KW out put contineous
rating directly coupled Engine and Alternator with guard and mounted on a common base plate of Robust
construction and complete without control panel having IP-52 protection, Acoustic Enclosure as per CPCB
norms , sound absorbing material, t to restrict sound level up to 75 dB up to 1 mtr distance and as per
CPCB norms etc as per following specifications mentioned below.

A. Alternator : Kirloskar / Stamford / Crompton Greaves / Leroy Somer make. The alternator of the output
rating shall be 3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self
regulated, and shall confirm to IS: 13364 of 1992 with regulation of +5% from no load to full load. degree
of protections shall be IP21.

B.Diesel Engine : Kirloskar / Cummins / Mahindra & Mahindra Diesel Engine start, developing
suitable ------------- - BHP output at 1500 RPM with mechanical / electronic governing so as to enable the
alternator to give - - - - -KVA continuous output at 0.8 P.F. lagging at NTP conditions. The diesel engine
shall be capable of providing 10% O/L for 1 Hr for every 11 Hrs of continuous running at full load. The
engine with 1st filling of oil and Diesel etc. 01. Exhaust pipe of required size and length
with insulation or
clading.
02. Diesel tank suitable for 8 to 12 Hours running capacity.
03. Residential Silencer.
04. SMF Batteries with leads as per the Manufacturer standards

C. AMF Control Panel:- AMF control panel shall be


fabricated with 16SWG CRCA sheet shall be totally enclosed with dust and Vermin proof, floor mounted /
wall mounted type and shall be comprising the following.
01. Voltmeter with selector switch.
02. 4 Pole MCCB incomer of ----------A rating of Schenieder
/ L&T make for EB and DG .
03. Ammeter with selector switch with CTs.
04. PF Meter and frequency Meter.
05. Indicator lamps (set Run, Load ON) with fuses.
06. KWH Meter of required rating.
07. Set of control fuses and current transformer.
08. Input Terminal board and output Terminal Board.
09. Battery charger with transformer rectifier unit.
10. Alternator supply air break contactor of L&T make.
11. Main supply air break contactor of L&T make.
12. Audio Visual announciation .
13. Main supply voltage set of control relays and timers
with one mode selector switch, set of push buttons.
14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core

Deleted SOR 11-12 ELEC-10.1.6


63.00KVA, 3 Phase, 415, 50Hz, 78 to 83BHP, water cooled multi cylinder diesel generator set with
alternator of 63KVA
out put continous rating at 0.8 p.f, and Batteries .
125KVA, 3 Phase, 415, 50Hz, 154BHP, water cooled multi cylinder diesel generator set with alternator
of 125 KVA out put continous rating at 0.8 p.f, and Batteries .

Supply, Transportation, erection and


commissioning (Excluding Foundation) of 3 Phase, 415,
50Hz, water cooled multi cylinder diesel generator set with alternator of - - - KVA/ - - - - - KW out put
contineous rating directly coupled Engine and Alternator with guard and mounted on a common base
plate of Robust construction and complete without control panel having IP-52 protection, Acoustic
Enclosure as per CPCB norms , sound absorbing material, t to restrict sound level up to 75 dB up to 1
mtr distance and as per CPCB norms etc as per following specifications mentioned below.

A. Alternator : Kirloskar / Stamford / Crompton Greaves / Leroy Somer make. The alternator of the output
rating shall be 3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self
regulated, and shall confirm to IS: 13364 of 1992 or latest version with regulation of +5% from no
load to full load. degree of protections shall be IP23.

B.Diesel Engine : Kirloskar / Cummins / Catterpiller Diesel


Engine start, developing suitable -------------- BHP output at 1500 RPM with mechanical / electronic
governing so as to enable the alternator to give - - - - -KVA continuous output at 0.8 P.F. lagging at NTP
conditions. The diesel engine shall be capable of providing 10% O/L for 1 Hr for every 11 Hrs of
continuous running at full load. The engine with 1st filling of oil and Diesel etc.
01. Exhaust pipe of required size and length with insulation or clading.
02. Diesel tank suitable for 8 to 12 Hours running capacity.
03. Residential Silencer.
04. SMF Batteries with leads as per the Manufacturer standards

C. AMF Control Panel:- AMF control panel shall be fabricated with 16SWG
CRCA sheet
shall be totally enclosed with dust and Vermin proof, floor mounted / wall mounted type and
shall be comprising the following.
01. Voltmeter with selector switch.
02. 4 Pole MCCB incomer of ----------A rating of Schenieder / L&T make for EB and DG.
03. Ammeter with selector switch with CTs.
04. PF Meter and frequency Meter.
05. Indicator lamps (set Run, Load ON) with fuses.
06. KWH Meter of required rating.
07. Set of control fuses and current transformer.
08. Input Terminal board and output Terminal Board.
09. Battery charger with transformer rectifier unit.
10. Alternator supply air break contactor of L&T make.
11. Main supply air break contactor of L&T make.
12. Audio Visual announciation.
13. Main supply voltage set of control relays and timers with one mode selector switch, set of push
buttons.
14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core
14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core

160KVA, 3 Phase, 415, 50Hz, 200BHP, water cooled multi cylinder diesel generator set with alternator of
160 KVA
out put continous rating at 0.8 p.f, and Batteries.
250KVA, 3 Phase, 415, 50Hz, 310BHP, water cooled multi cylinder diesel generator set with alternator
of 250 KVA out put continous rating at 0.8 p.f, and Batteries

320KVA, 3 Phase, 415, 50Hz, 380BHP, water cooled multi cylinder diesel generator set with alternator of
45 KVA out put continous rating at 0.8 p.f, and Batteries

UPS SYSTEMS
Supply and installation of 800 VA,12VDC home UPS system pure sine wave out put, single phase input /
Single phase output. Makes: Servomax / Top Power / Amar Raja

Supply and installation of 1400 VA,24 VDC home UPS system pure sine wave out put, single phase input
/ Single phase output. Makes: Servomax / Top Power / Amar Raja

Supply and installation of 2000VA, 36VDC home UPS system pure sine wave out put, single phase
input / Single phase output. Makes: Servomax / Top Power /Amar Raja /Samhitha.
Supply and installation of 2.0KVA true on line UPS system IGBT technology pure sine wave out put,
double conversion with auto and manual static by pass switch single phase input / Single phase
output. Makes: Numeric / DB Power.
Supply and installation of 3.0KVA, 72VDC true on line UPS system IGBT technology pure sine
wave out put, double conversion with auto and manual static by pass switch single phase input
/ Single phase output. Makes: CONSUL / Power one / Numeric / DB Power.
Supply and installation of 5.0KVA, 180/192VDC true on line UPS system IGBT technology pure sine wave
out put, double conversion with auto and manual static by pass switch single phase input / Single phase
output. Makes: CONSUL / Power one / Numeric / DB Power.

Supply and installation of 7.5KVA, 180/192VDC true on line UPS system IGBT technology pure
sine wave out put, double conversion with auto and manual static by pass switch single
phase input / Single phase output. Makes: CONSUL / Power one / Numeric / DB Power.
Supply and installation of 10KVA, 180/192VDC true on line UPS system IGBT technology pure sine wave
out put, double conversion with auto and manual static by pass switch single phase input / Single phase
output. Makes: CONSUL / Power one / Numeric / DB Power.
Supply and providing of UPS cum battery rack up to 4 batteries
Supply and providing of UPS cum battery rack 5 to 10 batteries
Supply and providing of UPS cum battery rack upto 11 to 20 batteries
Supply and fixing of 12V 26 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V 42 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V 65 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V 100 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V 120 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V, 120 AH MF battery including wire leads make Amar Raja(Power Zone) or
Equivalent model of Exide / Panasonic / Gotech.
Supply and fixing of 12V, 150 AH MF battery including wire leads make Amar Raja(Power Zone) or
Equivalent model of Exide / Panasonic / Gotech.

ms to be used on work are of first quality & ISI and as approved by the Engineer In charge of the work.
tes for all the materials are based on market rates plus Sales Tax/ Material VAT.
ntract VAT for General/ Composition Scheme on finished items may be allowed as applicable.
s for Building items are purely for guidance for the officers for preparation of estimates vide para.113 of APPWD code. Authority who pr
responsible
proper
(d) for
80 mm
diarates as envisaged in para.45 of APPWD code.
(f) 50 mm dia
Providing, installation, testing and commissioning of dual plate non - return valve of following sizes
confirming to IS: 5312 complete with rubber gasket, GI bolts , nuts, washers etc as required Makes:Audco
/ Kirloskar / BDK / H Shankar / Leader / Zolotto / Intervalve.

(a) 250 mm . dia


(b) 200 mm . dia
(c) 150 mm dia
(d) 100 mm dia
(e) 80 mm dia
(f) 50 mm dia
Manufacture, Supply and delivery of CI Wafer Lug type Butterfly Valves conforming to IS 13095/1991
(Reaffirmed 1998) excluding transportation, CED and taxes etc., complete. Operation done with worm
actuator ISI marked Rate at Ex-Factory Makes:Audco / Kirloskar / BDK /H Shankar/ Leader/ Zolotto /
Intervalve.

(a) 50 mm dia
(b) 40 mm dia
(c) 32 mm dia
Deleted From SOR 11-12 ELEC-2.2.7

Supplying and fixing 63mm dia, 15 mtr long RRL hose pipe with 63mm dia Male and Female Gun
metal / SS couplings duly binded with GI wire, rivets etc conforming to IS 636 (Type -A) as
required. Make: Newage/ Winco/ Padmini
Supplying and fixing 63mm dia, 15 mtr long CP hose pipe with 63mm dia Male and Female Gun metal /
SS couplings duly binded with GI wire, rivets etc conforming to IS 636 (Type -A) as required. Make:
Newage/ Winco/ Padmini
Supplying and fixing First -Aid Hose Reel with MS construction spray painted in Post office Red,
Conforming to Is 884 with upto date amendments, complete with the following as required.

a) 36.6 Mtr Long 20mm (Nominal internal) dia water hose Thermoplastic / Textile reinforced / Rubber
braided / Polypropylene Type - 2 as per IS:12585 Make: Eversafe/ Reliance/ Newage/ SRI

b) 20mm (Nominal internal) dia gun metal globe valve and nozzle. Make: Newage/ Winco/ Padmini

c) Drum and brackets for fixing the equipments on wall.


d) Connections from riser with 25mm dia stop valve (gun metal) & MS pipe.
Deleted SOR 11-12 ELEC-9.5.40
Supplying and fixing of hose cabinet of size 750mm X 600mm x 250mm made of No 16 gauge SWG
CRCA sheet with 6mm thick glazed glass door including necessary locking arrangement suitable to
accommodate 2 Nos 15 mtr long Hose pipe, 1 No branch pipe, mounted on wall OR raised brick platform
and duly painted with Post office red externally and white internally with synthetic enamel paint complete
in all respect, for external hydrant as required.

Supply and fixing 63mm dia Gun metal branch pipe with 20mm (Nominal internal diameter) size Gun
metal / SS nozzle conforming to IS 903, suitable for instantaneous connection to interconnect hose pipe
coupling as required. Make: Newage/ Winco/ Padmini

Supply and fixing 4 way fire brigade connection of cast iron body with 4 Nos
Gun metal
Male
instantaneous inlet couplings complete with cap and chain as required for 150mm dia MS pipe
connection, conforming to IS 904 as required.

Deleted SOR 11-12 ELEC-9.5.43


Supply and fixing 2 way fire brigade connection of cast iron body with 2 Nos
Gun metal
Male
instantaneous inlet couplings complete with cap and chain as required for 100mm dia MS pipe
connection, conforming to IS 904 as
required.

Supply and fixing air vessel made of 250 mm dia, 8 mm thick MS sheet, 1200mm in height with air release
valve on top and flanged connection to riser, drain arrangement with 25mm dia Gun metal wheel valve,
with required accessories, pressure gauge and painting with synthetic enamel paint of approved shade as
required.

Providing fixing, testing and commissioning of 15mm size quartzoid bulb type sprinklers of rating 68 C.
pendent / side
wall with required accessories. Makes: HD / TYCO / VIKING / NEWAGE/ SHARP

Providing and fixing of Pressure Switch in the MS pipe Line including connection etc as required. Make :
Danfoss / Indfoss / Approved makes
Providing and fixing Flow Switches in 100mm dia MS pipe. Makes : System Sensor / Switzer / Approved
makes
Providing and fixing Flow Switches in 150 mm dia MS pipe. Makes : System Sensor / Switzer / Approved
makes
Supply, installation, testing and commissioning of Bourden type, stainless steel dial type pressure gauge
with isolation valve and pipe having calibration of 0-16 kg/cm2. MAKE: HGURU/FIEBIG and Approved
makes
Supply, installation, testing and commissioning of 25mm dia Gate valve Makes : Zoloto / Leader /
Approved makes
Supply, installation, testing and commissioning of 25mm dia Ball valve Makes : Zoloto / Leader / Approved
makes
Supply, installation, testing and commissioning of

25 / 20mm dia Air Release Valve

Providing, fixing, testing, commissioning of installation control valve of Cast iron body and brass / Bronze
working parts comprising of water, motor alarm, bronze seat clapper, and clapper arm, hydraulically
driven mechanical gong bell to sound continuous alarm when the Wet riser / Sprinkler system activates,
pressure gauges, emergency releases, strainer, pressure switch, cock valve complete with drain valve
and bypass , test control box, ball valves, Ms pipe of required size, flanges, orifice plate, gasket etc of size
150mm dia as required. Makes : HD / TYCO / NEWAGE

Supplying, installing, testing and commissioning approved make CI body Foot Valve with brass strainer
with necessary flanges, nuts and bolts etc., complete on to the suction line.Rate as per the lowest
quotation of Bharat Fire Safety Engineers.Makes:Normex & approved makes

a) 200mm nominal dia


b) 150mm nominal dia
c) 100mm nominal dia
d) 80mm nominal dia
Supply and laying of 300mm dia NP2 RCC Hume pipe with Collars for Road crossings

Supplying and wrapping the anticorrosive material for buried pipes with coating of Primer and
wrapping with 4 mm thick polymer corrosion resistant tape as per IS : 10221 with 15 mm overlap as per
specificatios.
a) 150mm nominal dia

b) 100mm nominal dia


c) 80mm nominal dia
Supply, fabricating , installing structural steel supports for fixing all sizes of MS pipes from ceiling / wall
with MS Channels, Angles, Flats, Rods, as required at site with anchor fasteners, Clamps, threaded
rods, nuts, bolts,washers etc complete with painting.

Deleted SOR 11-12 ELEC-9.5.53


Deleted SOR 11-12 ELEC-9.5.54
Deleted SOR 11-12 ELEC-9.5.55
Deleted SOR 11-12 ELEC-9.5.56
Deleted SOR 11-12 ELEC-9.5.57
Deleted SOR 11-12 ELEC-9.5.58
Deleted SOR 11-12 ELEC-9.5.59
Deleted SOR 11-12 ELEC-9.5.60
Deleted SOR 11-12 ELEC-9.5.61
Supply of 2 Core x 1.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal /CCI / Unicab /Polycab / Finolex /KEI / Havells.

Supply of 4 Core x 1.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal/ CCI /Unicab /Polycab /Finolex /KEI / Havells.

Supply of 4 Core x 2.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal/ CCI /Unicab/Polycab / Finolex / KEI / Havells.

Supply of 8 Core x 2.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal /CCI /Unicab / Polycab / Finolex /KEI / Havells.

Supply of 10 Core x 1.5Sqmm FRLS armoured copper cable as per IS. 7098 / Part-I / 1988 including all
taxes etc., complete of make Universal/CCI / Unicab /Polycab /Finolex /KEI /Havells.

GENERATORS SPECIFICATION
Supply, Transportation, erection and
commissioning (Excluding Foundation) of 3 Phase, 415, 50Hz,
water cooled multi cylinder diesel generator set with alternator of - - - KVA/ - - - - - KW out put contineous
rating directly coupled Engine and Alternator with guard and mounted on a common base plate of Robust
construction and complete without control panel having IP-52 protection, Acoustic Enclosure as per CPCB
norms , sound absorbing material, t to restrict sound level up to 75 dB up to 1 mtr distance and as per
CPCB norms etc as per following specifications mentioned below.

A. Alternator : Kirloskar / Stamford / Crompton Greaves make. The alternator of the output rating shall be
3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self regulated, and
shall confirm to IS: 13364 of 1992 with regulation of +5% from no load to full load. degree of protections
shall be IP21.
B.Diesel Engine : Kirloskar / Cummins / Ashok ley land / Mahindra Diesel Engine start, developing
suitable -------------- BHP output at 1500 RPM with class A2 Governing so as to enable the alternator to
give - - - - -KVA continuous output at 0.8 P.F. lagging at NTP conditions. The diesel engine shall be
capable of providing 10% O/L for 1 Hr for every 11 Hrs of continuous running at full load. The engine with
1st filling of oil and Diesel etc.
01. Exhaust pipe of required size and length with insulation or clading.
02. Diesel tank suitable for 8 to 12 Hours running capacity.
03. Residential Silencer.
04. SMF Batteries with leads as per the Manufacturer
standards

Deleted SOR 11-12 ELEC-10.1.1


15KVA, 3 Phase, 415, 50Hz, 19BHP, water cooled multi
cylinder diesel generator set with alternator of 15 KVA out
put continous rating at 0.8 p.f, Batteries .
30KVA, 3 Phase, 415, 50Hz,
40 to 42 BHP, water cooled multi cylinder diesel generator set with
alternator of 30KVA
out put continous rating at 0.8 p.f, Batteries.
40KVA, 3 Phase, 415, 50Hz, 56BHP, water cooled multi cylinder diesel generator set with alternator of
40 KVA out put continous rating at 0.8 p.f, and Batteries .

Supply, Transportation, erection and


commissioning (Excluding Foundation) of 3 Phase, 415, 50Hz,
water cooled multi cylinder diesel generator set with alternator of - - - KVA/ - - - - - KW out put contineous
rating directly coupled Engine and Alternator with guard and mounted on a common base plate of Robust
construction and complete without control panel having IP-52 protection, Acoustic Enclosure as per CPCB
norms , sound absorbing material, t to restrict sound level up to 75 dB up to 1 mtr distance and as per
CPCB norms etc as per following specifications mentioned below.

A. Alternator : Kirloskar / Stamford / Crompton Greaves / Leroy Somer make. The alternator of the output
rating shall be 3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self
regulated, and shall confirm to IS: 13364 of 1992 with regulation of +5% from no load to full load. degree
of protections shall be IP21.

B.Diesel Engine : Kirloskar / Cummins / Mahindra & Mahindra Diesel Engine start, developing
suitable ------------- - BHP output at 1500 RPM with mechanical / electronic governing so as to enable the
alternator to give - - - - -KVA continuous output at 0.8 P.F. lagging at NTP conditions. The diesel engine
shall be capable of providing 10% O/L for 1 Hr for every 11 Hrs of continuous running at full load. The
engine with 1st filling of oil and Diesel etc. 01. Exhaust pipe of required size and length
with insulation or
clading.
02. Diesel tank suitable for 8 to 12 Hours running capacity.
03. Residential Silencer.
04. SMF Batteries with leads as per the Manufacturer standards

C. AMF Control Panel:- AMF control panel shall be


fabricated with 16SWG CRCA sheet shall be totally enclosed with dust and Vermin proof, floor mounted /
wall mounted type and shall be comprising the following.
01. Voltmeter with selector switch.
02. 4 Pole MCCB incomer of ----------A rating of Schenieder
/ L&T make for EB and DG .
03. Ammeter with selector switch with CTs.
04. PF Meter and frequency Meter.
05. Indicator lamps (set Run, Load ON) with fuses.
06. KWH Meter of required rating.
07. Set of control fuses and current transformer.
08. Input Terminal board and output Terminal Board.
09. Battery charger with transformer rectifier unit.
10. Alternator supply air break contactor of L&T make.
11. Main supply air break contactor of L&T make.
12. Audio Visual announciation .
13. Main supply voltage set of control relays and timers
with one mode selector switch, set of push buttons.
14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core

Deleted SOR 11-12 ELEC-10.1.6


63.00KVA, 3 Phase, 415, 50Hz, 78 to 83BHP, water cooled multi cylinder diesel generator set with
alternator of 63KVA
out put continous rating at 0.8 p.f, and Batteries .
125KVA, 3 Phase, 415, 50Hz, 154BHP, water cooled multi cylinder diesel generator set with alternator
of 125 KVA out put continous rating at 0.8 p.f, and Batteries .

Supply, Transportation, erection and


commissioning (Excluding Foundation) of 3 Phase, 415,
50Hz, water cooled multi cylinder diesel generator set with alternator of - - - KVA/ - - - - - KW out put
contineous rating directly coupled Engine and Alternator with guard and mounted on a common base
plate of Robust construction and complete without control panel having IP-52 protection, Acoustic
Enclosure as per CPCB norms , sound absorbing material, t to restrict sound level up to 75 dB up to 1
mtr distance and as per CPCB norms etc as per following specifications mentioned below.

A. Alternator : Kirloskar / Stamford / Crompton Greaves / Leroy Somer make. The alternator of the output
rating shall be 3 Phase, 415V, 50Hz, Ac , 0.8 P.F. lagging at 1500 RPM. The alternator is self excited, self
regulated, and shall confirm to IS: 13364 of 1992 or latest version with regulation of +5% from no
load to full load. degree of protections shall be IP23.

B.Diesel Engine : Kirloskar / Cummins / Catterpiller Diesel


Engine start, developing suitable -------------- BHP output at 1500 RPM with mechanical / electronic
governing so as to enable the alternator to give - - - - -KVA continuous output at 0.8 P.F. lagging at NTP
conditions. The diesel engine shall be capable of providing 10% O/L for 1 Hr for every 11 Hrs of
continuous running at full load. The engine with 1st filling of oil and Diesel etc.
01. Exhaust pipe of required size and length with insulation or clading.
02. Diesel tank suitable for 8 to 12 Hours running capacity.
03. Residential Silencer.
04. SMF Batteries with leads as per the Manufacturer standards

C. AMF Control Panel:- AMF control panel shall be fabricated with 16SWG
CRCA sheet
shall be totally enclosed with dust and Vermin proof, floor mounted / wall mounted type and
shall be comprising the following.
01. Voltmeter with selector switch.
02. 4 Pole MCCB incomer of ----------A rating of Schenieder / L&T make for EB and DG.
03. Ammeter with selector switch with CTs.
04. PF Meter and frequency Meter.
05. Indicator lamps (set Run, Load ON) with fuses.
06. KWH Meter of required rating.
07. Set of control fuses and current transformer.
08. Input Terminal board and output Terminal Board.
09. Battery charger with transformer rectifier unit.
10. Alternator supply air break contactor of L&T make.
11. Main supply air break contactor of L&T make.
12. Audio Visual announciation.
13. Main supply voltage set of control relays and timers with one mode selector switch, set of push
buttons.
14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core
14.Control cable up to 15 Mtrs 2.5Sqmm 6 Core

160KVA, 3 Phase, 415, 50Hz, 200BHP, water cooled multi cylinder diesel generator set with alternator of
160 KVA
out put continous rating at 0.8 p.f, and Batteries.
250KVA, 3 Phase, 415, 50Hz, 310BHP, water cooled multi cylinder diesel generator set with alternator
of 250 KVA out put continous rating at 0.8 p.f, and Batteries

320KVA, 3 Phase, 415, 50Hz, 380BHP, water cooled multi cylinder diesel generator set with alternator of
45 KVA out put continous rating at 0.8 p.f, and Batteries

UPS SYSTEMS
Supply and installation of 800 VA home UPS system pure sine wave out put, single phase input / Single
phase output. Makes: Servomax / Top Power / Amar Raja

Supply and installation of 1400 VA home UPS system pure sine wave out put, single phase input / Single
phase output. Makes: Servomax / Top Power / Amar Raja

Supply and installation of 2000VA, 36VDC home UPS system pure sine wave out put, single phase
input / Single phase output. Makes: Servomax / Top Power /Amar Raja /Samhitha.
Supply and installation of 2.0KVA true on line UPS system IGBT technology pure sine wave out put,
double conversion with auto and manual static by pass switch single phase input / Single phase
output. Makes: Megatech / Power one / Numeric / DB Power.
Supply and installation of 3.0KVA, 72VDC true on line UPS system IGBT technology pure sine
wave out put, double conversion with auto and manual static by pass switch single phase input
/ Single phase output. Makes: Megatech / Power one / Numeric / DB Power.
Supply and installation of 5.0KVA, 180/192VDC true on line UPS system IGBT technology pure sine wave
out put, double conversion with auto and manual static by pass switch single phase input / Single phase
output. Makes: Megatech / Power one / Numeric / DB Power.

Supply and installation of 7.5KVA, 180/192VDC true on line UPS system IGBT technology pure
sine wave out put, double conversion with auto and manual static by pass switch single
phase input / Single phase output. Makes: Megatech / Power one / Numeric / DB Power.
Supply and installation of 10KVA, 180/192VDC true on line UPS system IGBT technology pure sine wave
out put, double conversion with auto and manual static by pass switch single phase input / Single phase
output. Makes: Megatech / Power one / Numeric / DB Power.
Supply and providing of UPS cum battery rack up to 4 batteries
Supply and providing of UPS cum battery rack 5 to 10 batteries
Supply and providing of UPS cum battery rack upto 11 to 20 batteries
Supply and fixing of 12V 26 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V 42 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V 65 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V 100 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V 120 AH SMF battery including wire leads make Quanta / Racket / Exide.
Supply and fixing of 12V, 120 AH MF battery including wire leads make Amar Raja(Power Zone) or
Equivalent model of Exide / Panasonic / Gotech.
Supply and fixing of 12V, 150 AH MF battery including wire leads make Amar Raja(Power Zone) or
Equivalent model of Exide / Panasonic / Gotech.

ms to be used on work are of first quality & ISI and as approved by the Engineer In charge of the work.
tes for all the materials are based on market rates plus Sales Tax/ Material VAT.
ntract VAT for General/ Composition Scheme on finished items may be allowed as applicable.
s for Building items are purely for guidance for the officers for preparation of estimates vide para.113 of APPWD code. Authority who pr
responsible for proper rates as envisaged in para.45 of APPWD code.

JUNE

2015-16

Basic Rate

Unit

REVISING RATES OF MATERIALS

S. Rate for

UNIT

1 cum

335
46
70
320

1 Kg
1 Kg
1 sqm
6400.00

1 tonne
1 Kg

63
875
1210
1145
635

1 cum
1 cum
1 cum
1 cum

45.00

695
23
26
130
10
21
11
45
23
13
9
5
46
73

2014-15

1 Each
1 kg
1 Each
1 Each
1 ltr
1 Rm
1 Each
1 Rm
1 Rm
1 Each
1 Each
1 Each
1 Each
1 kg
1 kg

70

1 kg
1 cum

610
460
677
115
138
160
735
110
170
290
320
490
100
66000
28
250
72
54000
345
695
35
23000
12
15
17
475
95
135
185
90
128
80
42
45
485
175
42000.00
65.00

1 cum
1 cum
1 sqm
1 sqm
1 sqm
1 Rm
1 Rm
1 Rm
1 Rm
1 Rm
1 Rm
1 kg
1 tonne
1 sqm
1 Each
1 kg
1 cum
1 Rm
1 Rm
1 Each
1 cum
1 Each
1 Each
1 Each
1 Each
1 sqm
1 sqm
1 sqm
1 kg
1 cum
1 ltr
1 cum
1 Rm
1 Rm
1 Rm
1 tonne
1 Each

25
235

1 Each

185

1 cum

350
45000.00

1 cum
1 tonne

44000.00

1 tonne

1 sqm

86
260
360
420
630
23

1 kg

39

1 Each

59

1 Each

155

1 cum

318

1 cum

75
12
41
235
185
689
271
223
196
230
460
170
483
374

1 kg

1 ltr
1 Kg
1 sqm
1 sqm
1 Each

1 Each
1 Each
1 sqm
1 ltr
1 ltr
1 ltr
1 ltr
1 ltr
1 Rm
1 Rm
1 Kg
1 Ltr
1 Ltr

: 2014-15
S. Rate for 2014-15 UNIT

235
450
140
365
960
85
235
225
190
130
215
280
175
185
150

1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 ltr
1 ltr
1 kg
1 kg
1 Rm
1 Rm

780
1670
1210
1600

1 Rm
1 Rm
1 Rm
1 Rm

1630
1150
275

1 Rm
1 Rm
1 kg
1 Each

15
23
200
178
700

1 Each
1 kg
1 kg
1 ltr

1 Each
1 Each
For establishing
Electrical sub
stations at the
projects sites
wherever
necessary, the rates
approved by
APTRANSCO may
be followed.

1 Each
1 Each
1 Each
1 Set
1 1000 m
1 Rm
1 Rm
1 Rm
1 Rm

R: 2014-15
MENT
21,50,000

1 Each

86000.00

1 Each

7,10,000

1 Each

9,50,000

1 Each

8,65,000

1 Each

10,85,000

1 Each

11,20,000

1 Each

13,70,000

1 Each

54,75,000

1 Each

12,00,000

1 Each

42,45,000

1 Each

65,00,000

1 Each

5,30,000

1 Each

30000.00

1 Each

56000.00

1 Each

15500.00

1 Each

1,50,000

1 Each

1,45,000

1 Each

2,60,000

1 Each

2,55,000

1 Each

2361000.00

1 Each

34,04,430
38,55,000

1 Each
1 Each

86000.00

1 Each

11,00,000

1 Each

4,95,000

1 Each

6,40,000

1 Each

21,20,000

1 Each

40000.00

1 Each

24500.00

1 Each

60000.00

1 Each

55000.00

1 Each

1,90,000

1 Each

1,00,000

1 Each

10,58,000

1 Each

13,02,000

1 Each

86000.00

1 Each

14,50,000

1 Each

86000.00

1 Each

4,75,000

1 Each

1,02,000

1 Each

2,80,000

1 Each

22,80,000

1 Each

65000.00

1 Each

20000.00

1 Each

21000.00

1 Each

21500.00

1 Each

25500.00

1 Each

7,80,000

1 Each

4,25,000

1 Each

5,80,000

1 Each

85000.00

1 Each

16000.00

1 Each

52000.00

1 Each

8,50,000

1 Each

37,50,000

1 Each

63,80,000

1 Each

6,53,000

1 Each

16,25,000

1 Each

86000.00

1 Each

2,40,000

1 Each

74,75,000

1 Each

4,25,000

1 Each

14,75,000

1 Each

86000.00

1 Each

19,60,000

1 Each

86000.00

1 Each

56000.00

1 Each

2,60,000

1 Each

29,50,000

1 Each

6,50,000

1 Each

14,22,000

1 Each

86000.00

1 Each

48000.00

1 Each

3,75,000

1 Each

1,44,84,250

1 Each

1,85,220
1,03,90,875

1 Each
1 Each

1,85,220

1 Each

487770.00

1 Each

S. Rate for

UNIT

10500.00

Each

10600.00

Each

12720.00

Each

13568.00

Each

4-15

2120.00

Rm

4028.00

Each

6254.00

Each

700.00

Each

28080.00

Each

51500.00

tonne

5150.00

Each

5000.00

Each

10000.00

Each

12000.00

Each

18000.00

Set

265.00

Rm

35.00

cum

S. Rate for
Deleted

UNIT
1 Each
1 Each
1 Each
1 Set
1 Set
1 Set

1 Rm
1 Rm

R : 2014-15
S. Rate for

UNIT

180.00

Rm

298.00

Rm

371.00
57.00

KVA /
month
ltr

9.10

Kwhr

0%
10%

11%

%/
annum
%/

260.00

1 annum
ltr

69.00

1 ltr

100.00

1 kg

18132.00

1 annum

94.00

1 kg

78.00

1 ltr

24.00

1 kg

41.00

LS

185.00

1 Rm

16.00

LS

17.00

LS

17.00

LS

17.00

LS

17.00

LS

17.00

LS

deleted

LS

deleted

LS

deleted

LS

deleted

LS

14500.00
260.00

1 Each
1 Kg

7700.00

1 Each

150.00

LS

S. Rate for

UNIT

224400

1 Each

121000

1 Each

85,800

1 Each

72,600

1 Each

33,000

1 Each

23,100

1 Each

12100

1 Each

180
28820

1 Kg
1 Each

195800

1 Each

35,200

1 Each

50,380

LS

4,620

1 Each

tion Work Items


General

14%

General

5%

Canals & Allied Works

0.005

Canals & Allied Works

2%

Canals & Allied Works

0.005

Canals & Allied Works

1%

Canals & Allied Works

90%

Canals & Allied Works

90%

Canals & Allied Works

10%

Canals & Allied Works

10%

Dam & Allied Works

15%

Dam & Allied Works

5%

Tunnel & Allied Works

2.5%

Tunnel & Allied Works

2.5%

Tunnel & Allied Works

2.50%

Hire Charges

10%

Gates & Allied Works

Gates & Allied Works

3%

Tunnel & Allied Works

1%

Tunnel & Allied Works

4.50%

Tunnel & Allied Works

1.60%

Tunnel & Allied Works

2.5%

Dam & Allied Works

3%

Dam & Allied Works

4%

ALS

or materials

of lead
S. Rate for 2014-15 Unit
147.00
164.00

1 cum
1 cum

460.00

1 cum

610.00

1 cum

677.00

1 cum

128.00

1 cum

103.00

1 Cum

Deleted

1 Cum

92.00

1 Cum

72.00

1 Cum

345.00
667.00

1 Cum
1 cum

685.00

1 cum

711.00

1 cum

592.00

1 cum

582.00

1 cum

510.00

1 cum

489.00

1 cum

489.00

1 cum

357.00

1 cum

438.00

1 cum

474.00

1 cum

474.00

1 cum

561.00

1 cum

619.00

1 cum

620.00

1 cum

685.00

1 cum

850.00

1 cum

557.00

1 cum

914.00

1 cum

1040.00

1 cum

667.00

1 cum

1145.00
914.00

1 cum
1 cum

872.00

1 cum

714.00

1 cum

662.00

1 cum

635.00
875.00
704.00

1 cum
1 cum
1 cum

798.00

1 cum

919.00

1 cum

1029.00

1 cum

1210.00

1 cum

1129.00

1 cum

1040.00

1 cum

1103.00

1 cum

1145.00

1 cum

735.00

1 cum

935.00

1 cum

1097.00

1 cum

1365.00

1 cum

1313.00

1 cum

845.00

1 cum

as per PH item

1 Rmt
1 litre

474
330
381
70,931

1 litre
1 sqm
1 tonne
1 sqm

968
local market rate

1 Nos
1 kg

80
570
785

1 Nos
1 Nos

As per Market
Competitive rates

1 cum

1 Nos
1 Nos

1 Nos
1 Nos
7.50

1 kg

70.00

1 kg

R&B Dept based


on refinery
rates
R&B
Dept based
on refinery rates

1 tonne
1 tonne

1 tonne
1 tonne
1 tonne
1 tonne
As per Building
SOR
54.00
6400.00
42000.00

1 each
1 kg
1 tonne
1 tonne
1 Nos

165
541
82
536
59,225
206
194
130

1 sqm
1 each
1 kg
1 tonne
1 kg
1 cum
1 liter

As per quotations
40.00
As per local
competitive
quotations
13.00

1 each
1 cum
1 metre

100 Nos
1 kg

361
118
613
633
25
40
195

1 kg
1 kg
1 kg
1 each
1 each
1 Nos
1 sqm

180
932
73

1 kg
1 kg

As per local
Rate competitive
as per item
quotations
No.
52
I&CAD
Rate asofper
item
No.
53
of
I&CAD
Rate as per item

1 sqm

No. 54
As of
perI&CAD
local

1 sqm

competitive
115.00
quotations
138.00

1 sqm

1 sqm
1 sqm
1 sqm

160.00
As per local
competitive
23.00
quotations
Rate covered in hire
charges
of
6.00
machinery of
8.00
Irrigation items
as per PH items

1 sqm
1 Nos
1 hour
1 kg
1 kg
1 metre

1 metre
As per local
competitive
quotations

1 each
1 metre
1 litre
1 tonne
1 kg

90.00

1 sqm

65.00

1 litre

Deleted

1 kg

As per local
competitive
As
per local
quotations
competitive
46865.00
quotations
As per local
competitive
quotations

1 kg

As per local
competitive
quotations

1 metre

20.00

1 kg
1 tonne
1 metre

1 Nos

100.00

1 kg

255.00

1 litre

Rate as per local


competitive
quotations

1 litre
1 Sqm
1 metre
1 metre

Rate as per local


Ratecompetitive
as per PH
quotations
item
Rate as per local
competitive
quotations

1 kg
1 metre
1 Sqm
1 Nos
1 metre
1 Sqm
1 cum

Rate as per local


competitive
quotations

1 metre

1 Sqm
Rate as per local
competitive
As per
building
quotations
SOR
As per local market
rate
252.00
Rate as per PH
items

1 kg
1 kg
1 kg
1 cum
1 metre
1 metre
1 metre

Rate as per local


competitive
quotations

1 kg

Rate as per local


competitive
quotations

1 metre
1 metre
1 metre
1 metre
1 metre

7.00

1 each

18.00

1 Nos

Rate as per local


competitive
80.00
quotations
18.00

1 each

40.00

1 cum

Rate as per local


quotations

1 sqm

15.00

1 each

local
quotations
As per building
SOR
2236.00

1 cum

Rate to be obtained
from Electricity/
Municipal
Departments

1 each

As per local
competitive market
rate

1 Nos

1 Nos
1 kg

1 metre

1 each
1 cum

1 each

1 kg

288.00

1 metre

561.00

1 metre

185.00

1 kg

211.00

1 kg

Rate as per local


competitive
42000.00
quotations
86.00

1 metre
1 tonne
1 kg

as per local
competitive
quotations
23.00

1 sqm

39.00

1 each

59.00

1 each

54.00

1 Nos

As per Building

1 each

Bld.SSR

1 cum

Rate as per
quotations

1 Nos

2616.00
103.00

1 each

1 Nos
1 tonne
1 KL

77.00
As per building SSR

1
1 litre

155.00

1 kg

252.00

1 kg

As per Building

1 each

SSR

1 each

1265.00

1 cum

75.00

1 each

1.60
Building SOR
Building SOR

1 cm
1 height
sqm
per letter
1 sqm

4.20

1 Rm

25.60

1 bag

144.00

1 Cum

1.75

1 sqm

140.00
265.00

1 Ltr
1 Ltr

2014-2015
Unit

1 Day
1 Day
1 Day
1 Day
As per Labour rates
of SOR

1 Day
1 Day
1 Day
1 Day
1 Day
1 Day

To follow the
relevant items of
Irrigation work items
as per AP. Standard
data

To follow the
relevant items of
Irrigation work items
as per AP. Standard
data

1 Tonne
1 Tonne
To follow as per
AP. Standard data

1 Tonne

To follow AP. Std


data

1 Tonne

1 Tonne

1 Tonne
1 Tonne

To follow AP. Std


data

1 Tonne
1 Tonne
1 Tonne

To follow AP. Std


data

1 Tonne
1 Tonne

To follow AP. Std


data

1 Rmt

follow
AP. Standard data

530
689

1 Rmt

895
1103

1 Rmt

1311

1 Rmt

1 Rmt
1 Rmt

follow
AP. Standard data

15237
17023
18807
20592

To follow AP. Standard


data

1 Joint
1 Joint
1 Joint
1 Joint

1 Joint

AP. Std. data

1 Joint

6389

1 Joint

7514
8653

1 Joint

9821
11030

1 Joint

20.00

1 Rmt

To follow AP. Standard


data

321

1 Joint
1 Joint

1 Rmt
1 Rmt

385
462

1 Rmt

553

1 Rmt

To follow AP. Standard


data

1 Rmt

1 Rmt

31
31

1 Rmt

31
28

1 Rmt

26

1 Rmt

To follow AP. Standard


data

To follow AP. Standard


data

1 Rmt
1 Rmt

1 Rmt

1 Rmt

35.00

1 Rmt

39.00

1 Rmt

44.00

1 Rmt

50.00

1 Rmt

61.00

1 Rmt

64.00

1 Rmt

69.00

1 Rmt

76.00

1 Rmt

83.00

1 Rmt

91.00

1 Rmt

97.00

1 Rmt

107.00

1 Rmt

174.00

1 Rmt

194.00

1 Rmt

238
264

1 Rmt
1 Rmt

To follow AP. Standard


data

To follow AP. Standard


data

1 No

1 No
1 No

165

1 No

176
191

1 No

226
351

1 No

385

1 No

156

1 No

177
188

1 No

201
220

1 No

256
400

1 No

438

1 No

To follow as per AP.


Standard data

1 No
1 No

1 No
1 No
1 No

1 Rmt
1 Rmt

To follow as per
AP. Standard data

To follow as per
AP. Standard data

1 Rmt

AP. Standard data

1 No

486
499

1 No

537
572

1 No

642
714

1 No

787
858

1 No

1 No
1 No
1 No
1 No

32

1 No

32
32

1 No

32
33

1 No

54
54

1 No

67
74

1 No

92
102
112

1 No

as per AP. Standard


data

656
1822
224

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

10 Sqm
1 Cum
1 Cum

53.00

1 HP/hour

39.00

1 HP/hour

AP. Standard data


AP. Standard data

11671
16717
25092
4794

10 Sqm
10 Rmt

10 Cum
10 Cum
10 Cum
10 Cum

36.00

1 Rmt

3260

1 Sqm

6518
2463

1 Sqm

2192
2670

1 Sqm

1643
1099
1206

1 Sqm

as per
AP. Standard data

1 Sqm
1 Sqm
1 Sqm
1 Sqm

1 Sqm
1 Sqm
1 Sqm

876

1 Sqm

1115

1 Sqm

134.00

1 Cum

41.00

1 Cum

AP. Standard data

1 Each
1 Each
1 Each

Relevant Building
SOR items.

1 Each
1 Each
10 Cum

50% extra over


the cost of
chamber.
150% extra over the
cost of work

1 Each

1755.00

10 Cum

1 Rmt
To adopt as per AP.
Standard data

1 Rmt
1 Rmt
1 Rmt
1 Rmt

Observed Data

20.46

1 litre

16.91
15.27

1 litre

14.27
13.40

1 litre

1 litre
1 litre

65.56
45.09
44.31
39.22
29.76
27.47
24.05
22.57
19.90
17.25

1 litre
1 litre
1 litre
1 litre
1 litre
1 litre
1 litre
1 litre
1 litre
1 litre

4.85
4.01
3.53
3.09
2.71

1 litre
1 litre
1 litre
1 litre
1 litre

//
ATTES
TED //

Basic Rate

Unit

2013-14

180
144
164

1 Cum
1 Cum

156
206
136
159
177
172

1 Cum

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
0.00

156

1 Cum

292
252

1 Cum
1 Cum
81.00

1 Cum

288.00

1 Cum

207
1901

1 Cum

82

1 Cum

50
50
90
152
102
10
11

each

each

each

each

each

each

each

1 Cum

0.00

532
692
822
1036
994
620
456
419
379
304

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

248
70

1 Cum

25%

1 Cum

1 Cum

10.00

1 Cum

17.0

1 Cum

123
111
87

1 Cum

78
73

1 Cum

308
504
656
780
984
944
588
456
419

1 Cum

379

1 Cum

304
70

1 Cum

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

1 Cum
25%

1 Cum

10.00

1 Cum

17.00

1 Cum

10.00

1 Cum

386
386

1 Cum

362
362

1 Cum

293
293

1 Cum

1 Cum
1 Cum
1 Cum

287
170
170

1 Cum

150
150

1 Cum

142
142

1 Cum

117

1 Cum

117
92
92

1 Cum

101
75
95

1 Cum

1 Cum
1 Cum
1 Cum
1 Cum

1 Cum
1 Cum

1 Cum
1 Cum

70

1 Cum

76
47

1 Cum

61
46

1 Cum

53
46
40
35
17

1 Cum

103
89
350
610
460
677
38

1 Cum
1 Cum

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum

As per Local prevailing rates based on


competitive rates
The monthly rates will be communicated by
Govt.

100
987
36

1 Cum
1 Cum
1 Kg

Rates have to be worked out based on


MORT&H data.
1 MT
1 MT
1 MT

The monthly rates


will be
communicated by
Govt.

1 MT
1 MT
) and (2 ) above may allowed

3.20
2.80
2.80

1 Sqm
1 Sqm
1 Sqm

4.40

1 Sqm

21
48
51

1 Each

53
26

1 Each

39
26

1 Each

33
33

1 Each

51
83

1 Each

1 Each
1 Each

1 Each
1 Each

1 Each

1 Each

26

1 Each

36
45
2.50
3.30
3.90

1 Each

2.10

1 Sqm

4.20
3.60
4.00
4.10
5.50
1.50

1 Sqm

65.60

1 Cum

136
144
166

1 Rmt

154
167
182

1 Rmt

1 Each
1 Sqm
1 Sqm
1 Sqm

1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm

1 Rmt
1 Rmt

1 Rmt
1 Rmt
0.00
1 Rmt

97
122
152

1 Rmt
1 Rmt
0.00

10

1 Each

10.50
17.60
12.65

1 Cum
1 Cum
1 Each
0.00
0.00
0.00
0.00
10 Sqm

70
74
80.30
87

10 Sqm
10 Sqm
10 Sqm
0.00

53.80

10 Sqm

10 Sqm

63.90
70.10

10 Sqm
0.00
0.00
10 Sqm

185
210
231
248.80
445.40
73
13

10 Sqm
10 Sqm
10 Sqm
10 Sqm
1 Kg
1 Each
252.00
82.00

196

1 Liter
1 Kg
1 Kg

55.30

1 Cum

30.70

1 Cum

0.00
Deleted
70.00
8.75
11

1 Cum
1 Kg
1
Mtr
1
Mtr

69.5

18
77

1
1

Ltr
1 sqm
1 kl

2013-14

4700.00

1000 Nos

5500.00

1000 Nos

25.00

1 Each

23.00

1 Each

20.00

1 Each

14.00

1 Each

7.00

1 Each

15.00

1 Each

12.00

1 Each

24.00

1 Each

19.00

1 Each

19.00

1 Each

11.00

1 Each

5.00

1 Each

12.00

1 Each

11.00

1 Each

670.00

1 Cum

56.00

1 Each

82.00

1 Each

110.00

1 Each

125.00

1 Each

96.00

1 Sqm

110.00
961.00

1 Sqm
10 Sqm

1239.00

10 Sqm

1654.00

10 Sqm

1379.00

10 Sqm

3859.00

10 Sqm

2756.00

10 Sqm

2947.00

1 Sqm

2562.00

1 Sqm

2178.00

1 Sqm

729.00

1 Sqm

589.00

1 Sqm

999.00

1 Sqm

476.00

1 Sqm

999.00

1 Sqm

465.00

1 Sqm

560.00

1 Sqm

571.00

1 Sqm

636.00

1 Sqm

603.00

1 Sqm

348.00

1 Sqm

413.00

1 Sqm

305.00

1 Sqm

297.00

1 Sqm

320.00

1 Sqm

248.00

1 Sqm

161.00

1 Sqm

1274.00

1 Sqm

1123.00

1 Sqm

1048.00

1 Sqm

631.00

1 Sqm

674.00

1 Sqm

1423.00

1 Sqm

154.00

1 Sqm

124.00

1 Sqm

176.00

1 Sqm

184.00

1 Sqm

177.00

1 Sqm

187.00

1 Sqm

184.00

1 Sqm

200.00

1 Sqm

193.00

1 Sqm

211.00

1 Sqm

307.00

1 Sqm

356.00

1 Sqm

292.00

1 Sqm

349.00

1 Sqm

349.00

1 Sqm

424.00

1 Sqm

360.00

1 Sqm

437.00

1 Sqm

294.00

1 Sqm

1310.00

1 Sqm

436.00

1 Sqm

497.00

1 Sqm

560.00

1 Sqm

447.00

1 Sqm

572.00

1 Sqm

643.00

1 Sqm

691.00

1 Sqm

930.00

1 Sqm

966.00

1 Sqm

1213.00

1 Sqm

1243.00

1 Sqm

1747.00

1 Sqm

1543.00

1 Sqm

1263.00

1 Sqm

1398.00

1 Sqm

314.00

1 Sqm

288.00

1 Sqm

288.00

1 Sqm

306.00

1 Sqm

270.00

1 Sqm

569.00

1 Sqm

588.00

1 Sqm

518.00

1 Sqm

571.00

1 Sqm

649.00

1 Sqm

335.00

1 Sqm

362.00

1 Sqm

558.00

1 Sqm

638.00

1 Sqm

712.00

1 Sqm

460.00

1 Sqm

506.00

1 Sqm

552.00

1 Sqm

76280.00

1 Cum

84756.00

1 Cum

93232.00

1 Cum

152516.00

1 Cum

131372.00

1 Cum

139848.00

1 Cum

148324.00

1 Cum

165275.00

1 Cum

136363.00

1 Cum

140258.00

1 Cum

147522.00

1 Cum

159741.00

1 Cum

48392.00

1 Cum

70170.00

1 Cum

51994.00

1 Cum

69327.00

1 Cum

222.00

1 Sqm

159.00

1 Sqm

165.00

1 Sqm

60.00

378.00

1 Kg

1 Rmt

61.00

1 Kg

61.00

1 Kg

61.00

1 Kg

200.00

1 Kg

355.00

1 Kg

82.00

1 Kg

82.00

1 Kg

146.00

1 Sqm

146.00

1 Sqm

146.00

1 Sqm

200.00

1 Sqm

200.00

1 Sqm

200.00

1 Sqm

228.00

1 Sqm

228.00

1 Sqm

228.00

1 Sqm

217.00

1 Sqm

527.00

1 Sqm

477.00

1 Sqm

378.00

1 Sqm

322.00

1 Sqm

239.00

1 Sqm

575.00

1 Sqm

477.00

1 Sqm

393.00

1 Sqm

307.00

1 Sqm

17.00

1 Sqm

2861.00

1 Sqm

2503.00

1 Sqm

696.00

1 Rmt

787.00

1 Rmt

861.00

1 Rmt

172.00

1 Each

252.00

1 Each

337.00

1 Each

418.00

1 Each

515.00

1 Each

75.00

1 Each

92.00

1 Each

111.00

1 Each

137.00

1 Each

165.00

1 Each

192.00

1 Each

518.00

1 Each

656.00

1 Each

25.00

1 Each

37.00

1 Each

54.00

1 Each

73.00

1 Each

90.00

1 Each

71.00
233.00
282.00
372.00
108.00
128.00
154.00
160.00
12.00
22.00

1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each

33.00
43.00
73.00
82.00
122.00
136.00
33.00
49.00
1247.00
2401.00
3419.00
319.00
380.00
413.00
112.00
147.00
176.00
192.00
217.00
154.00
174.00
183.00
56.00
71.00
49.00
124.00

1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each

438.00
140.00
61.00
325.00
441.00
795.00
1015.00
1587.00
1005.00

1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each
1 Each

1865.00

1 Each

4404.00

1 Each

908.00

1 Each

2335.00

1 Each

625.00

1 Each

718.00

1 Each

948.00

1 Each

104.00

1 Each

338.00

1 Each

894.00

1 Each

1163.00

1 Each

1245.00

1 Each

1306.00

1 Each

3678.00

1 Each

2734.00

1 Each

12149.00

1 Each

52.00

1 Kg

244.00

1 Sqm

265.00

1 Sqm

870.00

1 Sqm

723.00

1 Sqm

221.00

1 Litre

161.00

1 Litre

80.00

1 Litre

80.00

1 Litre

80.00

1 Litre

75.00

1 Kg

150.00

1 Litre

139.00

1 Litre

94.00

1 Litre

77.00

1 Litre

200.00

1 Litre

210.00

1 Litre

32.00

1 Kg

96.00

1 Litre

145.00
73.00

1 Litre
1 Kg

100.00

1 Litre

200.00

1 Litre

145.00

1 Litre

75.00

1 Litre

80.00

1 Litre

129.00

1 Litre

34.00

1 Kg

36.00

1 Kg

39.00

1 Kg

35.00

Pack

798.00

1 Kg

169.00

1 Kg

217.00

1 Kg

503.00

1 Kg

37.00

1 Kg

30.00

1 Kg

526.00

1 Kg

527.00

1 Kg

311.00

1 Kg

458.00

1 Kg

803.00

314.00

1 Kg

Pack

318.00

1 Kg

336.00

1 Kg

426.00

1 Litre

509.00

Pack

530.00

Pack

589.00

Pack

777.00

Pack

36.00

1 Kg

536.00

1 Kg

940.00

1 Kg

910.00

1 Kg

86.00

1 Kg

134.00

1 Kg

723.00

1 Litre

18.00

1 Kg

150.00

1 Litre

884.00

315.00

1 Litre

161.00

1 Litre

107.00

1 Litre

109.00
88.00
109.00
88.00

1
1
1
1

Pack

Litre
Litre
Litre
Litre

86.00
161.00
107.00

1 Litre
1 Litre
1 Litre

118.00
171.00

1 Litre
1 Litre

96.00

1 Litre

27.00

1 Kg

75.00
24.00

1 Litre
1 Litre

64.00

1 Kg

509.00

1 Litre

321.00

1 Litre

34.00
736.00
669.00
84.00

1
1
1
1

375.00

1 Litre

348.00

1 Litre

24.00

Kg
Kg
Kg
Kg

1 Kg

295.00

1 Litre

139.00

Pack

14.00

1 Kg

15.00

1 Kg

16.00

1 Kg

42.00

1 Kg

96.00

1 Kg

86.00

1 Kg

129.00

1 Sqm

99.00

1 Litre

74.00

1 Kg

88.00

1 Kg

22.00

1 Kg

22.00

1 Kg

67.00

1 Kg

268.00

1 Litre

193.00

1 Litre

289.00

1 Litre

311.00

1 Kg

1285.00

1 Litre

3535.00

1 Kg

482.00

1 Litre

441.00

1 Sqm

558.00

1 Sqm

693.00

1 Sqm

932.00

1 Sqm

981.00

1 Sqm

1177.00

1 Sqm

515.00

1 Sqm

644.00

1 Sqm

772.00

1 Sqm

1104.00

1 Sqm

1287.00

1 Sqm

1546.00

1 Sqm

331.00

1 Sqm

430.00

1 Sqm

594.00

1 Sqm

747.00

1 Sqm

859.00

1 Sqm

1034.00

1 Sqm

1379.00

1 Sqm

1653.00

1 Sqm

1929.00

1 Sqm

144.00

1 Kg

86.00

1 Kg

130.00

1 Litre

187.00

1 Litre

145.00

1 Litre

145.00

1 Kg

145.00

1 Kg

104.00

1 Kg

145.00

1 Litre

102.00

1 Litre

58.00

1 Litre

134.00

1 Litre

274.00

1 Litre

190.00

1 Litre

578.00

1 Kg

320.00

1 Litre

651.00

1 Litre

769.00

1 Litre

226.00

1 Kg

43.00

1 Kg

87.00

1 Kg

261.00

1 Litre

434.00

1 Litre

50.00
196.00

1 Kg
1 Litre

1185.00

25 Kg

552.00

25 Kg

522.00

1 Litre

261.00

1 Litre

253.00

1 Litre

193.00

1 Litre

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

696.00

20 Kg

1568.00

25 Kg

676.00

25 Kg

1191.00

25 Kg

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

Deleted

1 Sqm

260.00

1 Sqm

280.00

1 Sqm

307.00

1 Sqm

327.00

1 Sqm

403.00

1 Sqm

476.00

1 Sqm

502.00

1 Sqm

876.00

1 Sqm

327.00

1 Sqm

363.00

1 Sqm

476.00

1 Sqm

558.00

1 Sqm

633.00

1 Sqm

1034.00

1 Sqm

676.00

1 Sqm

767.00

1 Sqm

889.00

1 Sqm

1007.00

1 Sqm

1675.00

1 Sqm

778.00

1 Sqm

889.00

1 Sqm

1028.00

1 Sqm

1139.00

1 Sqm

2140.00

1 Sqm

252.00

1 Sqm

372.00

1 Sqm

474.00

1 Sqm

307.00

1 Sqm

439.00

1 Sqm

390.00

1 Sqm

150.00

1 Sqm

315.00

1 Sqm

494.00

1 Sqm

411.00

1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm

466.00
624.00
793.00
885.00
1257.00
1519.00
1657.00
559.00
651.00
862.00
1083.00
1212.00

225.00

1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm

273.00

1 Sqm

343.00

579.00

1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm

626.00

1 Sqm

1616.00
2013.00
2378.00
377.00
428.00
530.00
637.00
970.00
1147.00
493.00
530.00
696.00
873.00
1147.00
1323.00
591.00
668.00
777.00
873.00
1262.00
1346.00
679.00
762.00
864.00
1010.00
1346.00
1430.00
675.00
762.00
873.00
1097.00
1346.00
1430.00
762.00
863.00
1021.00
1116.00
1413.00
1515.00

420.00
553.00
691.00
865.00
1034.00
1382.00

672.00

1 Sqm

735.00

1 Sqm

817.00

1 Sqm

228.00

1 Sqm

417.00

1 Sqm

373.00

1 Sqm

446.00

1 Sqm

588.00

1 Sqm

159.00

1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm

228.00
293.00
337.00
420.00
470.00
534.00
606.00
642.00
403.00
577.00
633.00
428.00
596.00
643.00
450.00
829.00
407.00
1071.00
1285.00

602.00

1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm
1 Sqm

784.00

1 Sqm

407.00
449.00
528.00
528.00
662.00
975.00
956.00
465.00
546.00
680.00
642.00
839.00
1205.00
1209.00

1005.00

1 Sqm

1280.00

1 Sqm

1311.00

1 Sqm

1529.00

1 Sqm

281.00

1 Sqm

274.00

1 Sqm

248.00

1 Sqm

74.00

1 Rmt

85.00

1 Rmt

84.00

1 Rmt

74.00

492.00

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Each
1 Each
1 Each
1 Each
1 Each
1 Kg
1 Rmt
1 Litre
1 Each
1 Rmt
1 Rmt
1 Sqm

575.00

1 Sqm

619.00

1 Sqm

380.00

1 Sqm

480.00

1 Sqm

41.00
37.00
54.00
40.00
50.00
45.00
46.00
26.00
34.00
2.00
2.00
3.00
2.00
2.00
29.00
5.00
142.00
3.00
12.00
10.00

2738.00

1 Sqm

1254.00

1 Sqm

582.00

1 Sqm

1711.00

1 Sqm

26.00

1 Sqm

46.00

1 Sqm

1222.00

1 Sqm

1810.00

1 Sqm

7750.00

1 Sqm

230.00

1 Sqm
1 Sqm
1 Sqm
1 Sqm

307.00
385.00
461.00

1290.00

1 Sqm

1444.00

1 Sqm

1597.00

1 Sqm

765.00

1 Sqm

843.00

1 Sqm

919.00

1 Sqm

4288.00

1 Sqm

441.00

1 Sqm

367.00

1 Sqm

259.00

1 Sqm

138.00

1 Sqm

208.00

1 Sqm

276.00

1 Sqm

346.00

1 Sqm

415.00

1 Sqm

484.00

1 Sqm

554.00

1 Sqm

622.00

1 Sqm

692.00

1 Sqm

204.00

1 Sqm

300.00

1 Sqm

837.00

1 Sqm

893.00

1 Sqm

1227.00

1 Sqm

1501.00

1 Sqm

1922.00

1 Sqm

1039.00

1 Sqm

1371.00

1 Sqm

2003.00

1 Sqm

2759.00

1 Sqm

2083.00

1 Sqm

3435.00

1 Sqm

2950.00

1 Sqm

2185.00

1 Sqm

2076.00

1 Sqm

1350.00

1 Sqm

368.00

1 Sqm

411.00

1 Sqm

452.00

1 Sqm

465.00

1 Sqm

476.00

1 Sqm

497.00

1 Sqm

539.00

1 Sqm

1498.00

1 Sqm

1419.00

1 Sqm

1490.00

1 Sqm

0.00

1 Sqm

4560.00

1 Sqm

5200.00

1 Sqm

1392.00

1 Sqm

1767.00

1 Sqm

964.00

1 Sqm

1259.00

1 Sqm

0.00

1 Sqm

636.00

1 Sqm

636.00

1 Sqm

636.00

1 Sqm

636.00

1 Sqm

739.00

1 Sqm

750.00

1 Sqm

750.00

1 Sqm

750.00

1 Sqm

750.00

1 Sqm

861.00

1 Sqm

329.00

1 Sqm

921.00

1 Sqm

964.00

1 Sqm

1462.00

1 Sqm

1093.00

1 Sqm

1028.00

1 Sqm

1600.00

1 Sqm

1982.00

1 Sqm

325.00

1 Rm

2362.00

1 Sqm

2700.00

1 Sqm

1 Sqm

2450.00

340.00

1 Rm

2900.00 1 sqm

2475.00

1 Sqm

2200.00

1 Sqm

377.00

1 Sqm

430.00

1 Sqm

485.00

1 Sqm

1630.00

1 Sqm

1712.00

1 Sqm

1835.00

1 Sqm

961.00

1 Sqm

1034.00

1 Sqm

1158.00

1 Sqm

1294.00

1 Sqm

1150.00

1 Sqm

1319.00

1 Sqm

1380.00

1 Sqm

1504.00

1 Sqm

1627.00

1 Sqm

1180.00

1 Sqm

1799.00

1 Sqm

2152.00

1 Sqm

1813.00

1 Sqm

2461.00

1 Sqm

2142.00

1 Sqm

2777.00

1 Sqm

3178.00

1 Sqm

3447.00

1 Sqm

2139.00

1 Sqm

1500.00

1 Sqm

1767.00

1 Sqm

2161.00

1 Sqm

244.00

1 Rmt

921.00

1 Sqm

1392.00

1 Sqm

4338.00

1 Sqm

3342.00

1 Sqm

3642.00

1 Sqm

3162.00

1 Sqm

1682.00

1 Sqm

1923.00

1 Sqm

254.00

1 Rmt

200.00

1 Rmt

1108.00

1 Sqm

1108.00

1 Sqm

1108.00

1 Sqm

944.00

1 Sqm

944.00

1 Sqm

944.00

1 Sqm

219.00

1 Rmt

219.00

1 Rmt

248.00

1 Rmt

248.00

1 Rmt

703.00

1 Rmt

474.00

1 Rmt

6394.00

1 Sqm

7066.00

1 Sqm

6731.00

1 Sqm

8009.00

1 Sqm

1038.00

1 Sqm

1235.00

1 Sqm

9521.00

1 Sqm

10156.00

1 Sqm

1934.00

1 Sqm

2114.00

1 Sqm

1571.00

1 Sqm

1739.00

1 Sqm

3030.00

1 Sqm

1480.00

1 Sqm

2604.00

1 Sqm

Err:512
601.00

1 Rmt
1 Rmt

11139.00

1 Sqm

20886.00

1 Sqm

13228.00

1 Sqm

12532.00

1 Sqm

20886.00

1 Sqm

18209.00

1 Sqm

14995.00

1 Sqm

23671.00

1 Sqm

1500.00

1 Sqm

1285.00

1 Sqm

1767.00

1 Sqm

5684.00

1 Sqm

4721.00

1 Sqm

4769.00

1 Sqm

5206.00

1 Sqm

4721.00

1 Sqm

4240.00

1 Sqm

3315.00

1 Sqm

2953.00

1 Sqm

5848.00

1 Sqm

5848.00

1 Sqm

6186.00

1 Sqm

6017.00

1 Sqm

6186.00

1 Sqm

5511.00

1 Sqm

5511.00

1 Sqm

5511.00

1 Sqm

5511.00

1 Sqm

6411.00

1 Sqm

6411.00

1 Sqm

6411.00

1 Sqm

4386.00

1 Sqm

4386.00

1 Sqm

4386.00

1 Sqm

5343.00

1 Sqm

5680.00

1 Sqm

5680.00

1 Sqm

5005.00

1 Sqm

5005.00

1 Sqm

7085.00

1 Sqm

7423.00

1 Sqm

7423.00

1 Sqm

6748.00

1 Sqm

5905.00

1 Sqm

6281.00

1 Sqm

1125.00

1 Sqm

1125.00

1 Sqm

1125.00

1 Sqm

969.00

1 Sqm

969.00

1 Sqm

969.00

1 Sqm

4553.00

1 Sqm

6391.00

1 Sqm

5995.00

1 Sqm

6674.00

1 Sqm

6471.00

1 Sqm

7015.00

1 Sqm

0.00

1 Sqm

0.00

1 Sqm

5685.00

1 Sqm

5093.00

1 Sqm

7142.00

1 Sqm

6566.00

1 Sqm

4413.00

1 Sqm

4378.00

1 Sqm

7633.00

1 Sqm

5511.00

1 Sqm

0.00

1 Sqm

5302.00

1 Sqm

5880.00

1 Sqm

0.00

0.00

6212.00

1 Sqm

6801.00

1 Sqm

6801.00

1 Sqm

5570.00

1 Sqm

6095.00

1 Sqm

6095.00

1 Sqm

5088.00

1 Sqm

5409.00

1 Sqm

5409.00

1 Sqm

5409.00

1 Sqm

4766.00

1 Sqm

4766.00

1 Sqm

6748.00

1 Sqm

7069.00

1 Sqm

7069.00

1 Sqm

6427.00

1 Sqm

6427.00

1 Sqm

0.00

6105.00

1 Sqm

6105.00

1 Sqm

6105.00

1 Sqm

4177.00

1 Sqm

4177.00

1 Sqm

4177.00

1 Sqm

7551.00

1 Sqm

7551.00

1 Sqm

7551.00

1 Sqm

5088.00

1 Sqm

5088.00

1 Sqm

5088.00

1 Sqm

6005.00

1 Sqm

8450.00

1 Sqm

6748.00

1 Sqm

5455.00

1 Sqm

5568.00

1 Sqm

5568.00

1 Sqm

4724.00

1 Sqm

4724.00

1 Sqm

6903.00

1 Sqm

3240.00

1 Sqm

3872.00

1 Sqm

336.00

1 Cum

139.00

10 Sqm

116.00

10 Sqm

105.00

10 Sqm

116.00

10 Sqm

175.00

1 Cum

36.00

10 Sqm

41.00

10 Sqm

56.00

1 Cum

41.00

1 Cum

58.00

10 Sqm

6.00

10 Sqm

12.00

10 Sqm

37.00

10 Sqm

39.00

10 Sqm

Deleted

1 Cum

Deleted

1 Cum

Deleted

1 Cum

Deleted

1 Cum

Deleted

1 Cum

804.00

1 Sqm

902.00

1 Sqm

1127.00

1 Sqm

322.00

1 Sqm

403.00

1 Sqm

804.00

1 Sqm

13.00

1 Rmt

15.00

1 Rmt

18.00

1 Rmt

26.00

1 Rmt

32.00

1 Rmt

205.00

1 Cum

242.00

1 Cum

282.00

1 Cum

325.00

1 Cum

504.00

1 Cum

609.00

1 Cum

512.00

1 Sqm

782.00

1 Sqm

88.00

1 Rmt

269.00

1 Rmt

248.00

1 Rmt

14.00

1 Rmt

14.00

1 Rmt

22.00

1 Kg

4.00

1 Kg

20.00

1 Kg

18.00

1 Kg

111.00

1 Kg

1485.00

1 Sqm

808.00

1 Sqm

999.00

1 Sqm

1249.00

1 Sqm

324.00

1 Sqm

242.00

1 Sqm

1328.00

1255.00

1101.00

861.00

663.00

849.00

1281.00

875.00

1046.00

704.00

890.00

501.00

582.00

1228.00

1173.00

1018.00

796.00

637.00

795.00

1184.00

809.00

967.00

685.00

856.00

475.00

556.00

321.00

1 Kg

329.00

1 Sqm

838.00

1 Sqm

798.00

1 Sqm

1355.00

1 Sqm

2.00

1 Rmt

421.00

1 Sqm

421.00

1 Sqm

228.00

1 Litre

148.00

1 Each

33.00

1 Each

2586.00

1 Sqm

2820.00

1 Sqm

3163.00

1 Sqm

226.00

1 Sqm

293.00

1 Sqm

402.00

1 Sqm

302.00

1 Sqm

1112.00

1 Sqm

991.00

1 Sqm

568.00

1 Sqm

577.00

1 Each

1517.00

1 Each

3040.00

1 Each

779.00

1 Each

1759.00

1 Each

1410.00

1 Each

5236.00

1 Each

8.00

1 Litre

395.00

1 Rmt

1807.00

1 Rmt

687.00

1 Each

1430.00

1 Sqm

154.00

1 Rmt

222.00

1 Rmt

253.00

1 Rmt

4591.00

1 Sqm

4394.00

1 Sqm

4917.00

1 Sqm

124.00

1 Sqm

111.00

1 Sqm

97.00

1 Sqm

1050.00

1 Each

3541.00

1 Each

799.00

1 Sqm

0.00

0.00
0.00

3.00

1 Rmt
1 Each

2.00

1 Each

2.00

1 Each

6.00

1 Each

7.00

1 Each

105.00

1 Cum

174.00

1 Sqm

108.00

1 Sqm

456.00

1 Sqm

445.00

1 Sqm

400.00

1 Sqm

428.00

376.00

1 Sqm

307.00

1 Rmt

274.00

1 Rmt

4.00

1 Each

5.00

1 Each

5.00

1 Each

10.00

1 Each

1.00

1 Each

0.50

1 Each

0.30

1 Each

29.00
35.00
10.00
15.00
50.00
35.00
45.00
15.00
210.00
293.00
35.00
49.00
50.00

1 Kg

1 day

2145.00
125.00

1 Hr

116.00

1 Hr
1 day

1072.00
73.00

1 Each

121.00

1 Each

212.00

1 Each

10.00

1 Each

425.00

1 Rmt

1609.00

1 Sqm
1 Kg

121.00

1 Each

130.00

SS RATE FOR
5

2014-15

Unit

4
466.00

1 Rmt

408.00

1 Rmt

680.00

1 Rmt

614.00

1 Rmt

216.00

1 Rmt

268.00

1 Rmt

126.00

1 Rmt

10.00

1 Rmt

217.00

1 Rmt

49.00

1 Rmt

87.00

1 Rmt

34.00

1 Rmt

163.00

1 Rmt

47.00

1 Rmt

181.00

1 Rmt

314.00

1 Rmt

485.00

1 Rmt

888.00

1 Rmt

1,280.00

1 Rmt

1,742.00

1 Rmt

2,100.00

1 Rmt

2,536.00

1 Rmt

223.00

1 Rmt

332.00

1 Rmt

599.00

1 Rmt

941.00

1 Rmt

1,446.00

1 Rmt

1,875.00

1 Rmt

1,259.00

1 Rmt

2,756.00

1 Rmt

285.00

1 Rmt

415.00

1 Rmt

734.00

1 Rmt

1,115.00

1 Rmt

1,558.00

1 Rmt

1,979.00

1 Rmt

2,278.00

1 Rmt

3,099.00

1 Rmt

91.00

1 Each

168.00

1 Each

317.00

1 Each

643.00

1 Each

816.00

1 Each

1020.00

1 Each

175.00

1 Each

258.00

1 Each

281.00

1 Each

400.00

1 Each

468.00

1 Each

537.00

1 Each

631.00

1 Each

833.00

1 Each

1031.00

1 Each

1,234.00

1 Each

900.00

1 Each

1,153.00

1 Each

1,405.00

1 Each

1,659.00

1 Each

1,911.00

1 Each

1,123.00

1 Each

1,440.00

1 Each

1,756.00

1 Each

2,070.00

1 Each

2,387.00

1 Each

2,701.00

1 Each

33.00

1 Each

63.00

1 Each

120.00

1 Each

208.00

1 Each

329.00

1 Each

413.00

1 Each

568.00

1 Each

254.00

1 Each

28.00

1 Each

184.00
317.00

513.00

6,530.00

1 Each

10,218.00

1 Each

6,237.00

1 Each

9,651.00

1 Each

6,091.00

1 Each

3,672.00

1 Each

117.00

1 Each

71.00

1 Each

760.00

1 Rmt

998.00

1 Rmt

1,598.00

1 Rmt

831.00

1 Rmt

1109.00

1 Rmt

1,841.00

1 Rmt

211.00

1 Rmt

296.00

1 Each

376.00

1 Each

624.00

1 Each

367.00

1 Each

455.00

1 Each

994.00

1 Each

67.00

1 Each

462.00

1 Each

723.00

1 Each

1,714.00

1 Each

388.00

1 Each

531.00

1 Each

1,276.00

1 Each

91.00

1 Each

704.00

1 Each

855.00

1 Each

1,999.00

1 Each

608.00

1 Each

799.00

1 Each

1,872.00

1 Each

84.00

1 Each

298.00

1 Each

417.00

1 Each

909.00

1 Each

355.00

1 Each

472.00

1 Each

931.00

1 Each

410.00

1 Each

531.00

1 Each

1082.00

1 Each

42.00

1 Each

539.00

1 Each

660.00

1 Each

329.00

1 Each

55.00

1 Each

178.00

1 Each

356.00

1 Each

181.00

1 Each

227.00

1 Each

652.00

1 Each

953.00

1 Each

953.00

1 Each

281.00

1 Each

1,440.00

1 Each

1,514.00

1 Each

351.00

1 Each

231.00

1 Pair

64.00

1 Pair

298.00

1 Each

89.00

1 Each

2,304.00

1 Each

491.00

1 Each

1,691.00

1 Each

1,785.00

1 Each

246.00

1 Each

461.00

1 Each

71.00

1 Each

8,808.00

1 Each

12,872.00

1 Each

16,395.00

1 Each

2,466.00

1 Each

2,184.00

1 Each

2,677.00

1 Each

1,620.00

1 Each

1,972.00

1 Each

1,409.00

1 Each

1,832.00

1 Each

351.00

1 Each

1,142.00

1 Each

127.00

1 Each

451.00

1 Each

49.00

1 Each

845.00

1 Each

2,536.00

1 Each

2,818.00

1 Each

140.00

1 Each

4,508.00

1 Each

5,072.00

1 Each

351.00

1 Each

719.00

1 Each

225.00

1 Each

474.00

1 Each

29.00
542.00

1 Each
1 Each

43.00

1 Each

474.00

1 Each

43.00

1 Each

407.00

1 Each

29.00

1 Each

258.00

1 Each

29.00

1 Each

69.00

1 Each

14.00

1 Each

231.00

1 Each

29.00

1 Each

204.00

1 Each

29.00

1 Each

231.00

1 Each

29.00

1 Each

204.00

1 Each

29.00

1 Each

637.00

1 Each

611.00

1 Each

1,165.00

1 Each

1,165.00

1 Each

49.00

1 Each

1,165.00

1 Each

35.00

1 Each

611.00

1 Each

271.00

1 Each

237.00

1 Each

237.00

1 Each

29.00

1 Each

142.00

1 Each

29.00

1 Each

69.00

1 Each

14.00

1 Each

611.00

1 Each

29.00

1 Each

41.00

1 Each

49.00

1 Each

75.00

1 Each

93.00

1 Each

111.00

1 Each

137.00

1 Each

82.00

1 Each

50.00

1 Each

75.00

1 Each

74.00

1 Each

426.00

1 Each

44.00
349.00

1 Each
1 Each

41.00
226.00

1 Each
1 Each

44.00

1 Each

914.00

1 Each

44.00

1 Each

621.00

1 Each

44.00
459.00

1 Each
1 Each

44.00
1,368.00

1 Each
1 Each

44.00
1,864.00

1 Each
1 Each

67.00
2,692.00

1 Each
1 Each

90.00
5,135.00

1 Each
1 Each

112.00
7,268.00

1 Each
1 Each

133.00
402.00

1 Each
1 Each

56.00

1 Each

858.00

1 Each

67.00

1 Each

1,884.00

1 Each

112.00

1 Each

2,706.00

1 Each

112.00

1 Each

555.00

1 Each

54.00

1 Each

307.00

1 Each

54.00

1 Each

410.00

1 Each

54.00

1 Each

541.00

1 Each

54.00

1 Each

808.00

1 Each

54.00

1 Each

1217.00

1 Each

54.00

1 Each

1,761.00

1 Each

54.00

1 Each

476.00

1 Each

54.00

1 Each

621.00

1 Each

54.00

1 Each

912.00

1 Each

54.00

1 Each

1,655.00

1 Each

54.00

1 Each

2,484.00

1 Each

54.00

1 Each

4,345.00

1 Each

54.00

1 Each

167.00

1 Rmt

41.00

1 Rmt

192.00

1 Rmt

41.00

1 Rmt

252.00

1 Rmt

41.00

1 Rmt

350.00

1 Rmt

41.00
396.00

1 Rmt
1 Rmt

44.00

1 Rmt

432.00

1 Rmt

67.00

1 Rmt

185.00

1 Rmt

41.00

1 Rmt

206.00

1 Rmt

41.00

1 Rmt

270.00

1 Rmt

41.00

1 Rmt

379.00

1 Rmt

41.00

1 Rmt

424.00

1 Rmt

44.00

1 Rmt

457.00

1 Rmt

67.00

1 Rmt

811.00

1 Rmt

12.00

1 Each

8.00

1 Each

19.00

1 Each

8.00

1 Each

25.00

1 Each

8.00

1 Each

29.00

1 Each

9.00

1 Each

186.00

1 Each

20.00

1 Each

179.00

1 Each

22.00

1 Each

170.00

1 Each

22.00

1 Each

303.00

1 Each

22.00

1 Each

43.00

1 Each

22.00

1 Each

62.00

1 Each

21.00

1 Each

74.00

1 Each

24.00

1 Each

144.00

1 Each

41.00

1 Each

82.00

1 Each

36.00
62.00

1 Each
1 Each

31.00
1.00

1 Each
1 Each

3.00

1 Each

3.00

1 Each

3.00

1 Each

6.00

1 Ltr

1.00

1 Ltr

76.00

1 Each

47.00

1 Each

26.00

1 Each

89.00

1 Each

212.00

1 Each

1,455.00

1 Each

1,708.00

1 Each

823.00

1 Each

255.00

1 Each

405.00

1 Each

484.00

1 Each

288.00

1 Each

459.00

1 Each

562.00

1 Each

179.00

1 Each

277.00

1 Each

344.00

1 Each

191.00

1 Each

294.00

1 Each

356.00

1 Each

132.00

1 Each

202.00

1 Each

243.00

1 Each

111.00

1 Each

163.00

1 Each

210.00

1 Each

67.00

1 Each

112.00

1 Each

140.00

1 Each

1,153.00

1 Each

432.00

1 Each

696.00

1 Each

828.00

1 Each

473.00

1 Each

750.00

1 Each

914.00

1 Each

284.00

1 Each

441.00

1 Each

525.00

1 Each

303.00

1 Each

459.00

1 Each

567.00

1 Each

205.00

1 Each

318.00

1 Each

387.00

1 Each

177.00

1 Each

260.00

1 Each

314.00

1 Each

114.00

1 Each

178.00

1 Each

227.00

1 Each

1,885.00

1 Each

50.00

1 Each

70.00

1 Each

83.00

1 Each

67.00

1 Each

95.00

1 Each

107.00

1 Each

39.00

1 Each

54.00

1 Each

70.00

1 Each

67.00

1 Each

98.00

1 Each

118.00

1 Each

59.00

1 Each

89.00

1 Each

108.00

1 Each

73.00

1 Each

108.00

1 Each

130.00

1 Each

125.00

1 Each

183.00

1 Each

260.00

1 Each

200.00

1 Each

286.00

1 Each

295.00

1 Each

74.00

1 Each

118.00

1 Each

136.00

1 Each

95.00

1 Each

149.00

1 Each

171.00

1 Each

102.00

1 Each

158.00

1 Each

179.00

1 Each

132.00

1 Each

206.00

1 Each

231.00

1 Each

35.00

1 Each

51.00

1 Each

57.00

1 Each

59.00

1 Each

57.00

1 Each

79.00

1 Each

9.00

1 Each

14.00

1 Each

17.00

1 Each

19.00

1 Each

11.00

1 Each

14.00

1 Each

14.00

1 Each

15.00

1 Each

17.00

1 Each

18.00

1 Each

35.00

1 Each

188.00

1 Each

208.00

1 Each

238.00

1 Each

219.00

1 Each

227.00

1 Each

330.00

1 Each

112.00

1 Each

87.00

1 Each

108.00

1 Each

53.00

1 Each

102.00

1 Each

144.00

1 Each

112.00

1 Each

24.00

1 Each

39.00

1 Each

151.00

1 Each

117.00

1 Each

138.00

1 Each

146.00

1 Each

57.00

1 Each

64.00

1 Each

74.00

1 Each

53.00

1 Each

61.00

1 Each

64.00

1 Each

8.00

1 Each

9.00

1 Each

11.00

1 Each

9.00

1 Each

11.00

1 Each

14.00

1 Each

69.00

1 Each

29.00

1 Each

65.00

1 Each

118.00

1 Each

219.00

1 Each

298.00

1 Each

15.00

1 Each

25.00

1 Each

59.00

1 Each

116.00

1 Each

227.00

1 Each

90.00

1 Each

224.00

1 Each

65.00

1 Rmt

1,500.00

1 Each

1,997.00

1 Each

3,661.00

1 Each

1,665.00

1 Each

2,247.00

1 Each

1,349.00

1 Each

1,802.00

1 Each

1,207.00

1 Each

1,604.00

1 Each

982.00

1 Each

1,281.00

1 Each

1032.00

1 Each

1,281.00

1 Each

358.00

1 Each

411.00

1 Each

513.00

1 Each

589.00

1 Each

1125.00

1 Each

707.00

1 Each

781.00

1 Each

1,409.00

1 Each

1084.00

1 Each

1,463.00

1 Each

1,193.00

1 Each

1,785.00

1 Each

368.00

1 Each

433.00

1 Each

1033.00

1 Each

381.00

1 Each

494.00

1 Each

1130.00

1 Each

368.00

1 Each

433.00

1 Each

1033.00

1 Each

381.00

1 Each

494.00

1 Each

1130.00

1 Each

750.00

1 Each

875.00

1 Each

392.00

1 Each

501.00

1 Each

1065.00

1 Each

494.00

1 Each

666.00

1 Each

1,375.00

1 Each

582.00

1 Each

773.00

1 Each

1,452.00

1 Each

582.00

1 Each

773.00

1 Each

1,704.00

1 Each

638.00

1 Each

853.00

1 Each

1,836.00

1 Each

675.00

1 Each

908.00

1 Each

752.00

1 Each

947.00

1 Each

752.00

1 Each

947.00

1 Each

793.00

1 Each

1028.00

1 Each

465.00

1 Each

544.00

1 Each

1105.00

1 Each

318.00

1 Each

386.00

1 Each

793.00

1 Each

281.00

1 Each

318.00

1 Each

714.00

1 Each

407.00

1 Each

494.00

1 Each

997.00

1 Each

445.00

1 Each

582.00

1 Each

1,161.00

1 Each

936.00

1 Each

1007.00

1 Each

538.00

1 Each

732.00

1 Each

975.00

1 Each

582.00

1 Each

798.00

1 Each

915.00

1 Each

915.00

1 Each

568.00

1 Each

778.00

1 Each

486.00

1 Each

758.00

1 Each

758.00

1 Each

758.00

1 Each

758.00

1 Each

803.00

1 Each

803.00

1 Each

857.00

1 Each

1122.00

1 Each

1,216.00

1 Each

1,286.00

1 Each

1,572.00

1 Each

1,629.00

1 Each

2,288.00

1 Each

1,819.00

1 Each

2,514.00

1 Each

1,819.00

1 Each

2,514.00

1 Each

2,028.00

1 Each

2,760.00

1 Each

61.00

1 Each

19.00

1 Each

12.00

1 Each

2.00

1 Each

28.00

1 Each

133.00

1 Rmt

28.00

1 Rmt

2,167.00

1 Each

401.00

1 Each

576.00

1 Each

133.00

1 Each

31.00

1 Each

19.00

1 Each

105.00

1 Each

64.00

1 Each

657.00

1 Each

87.00

1 Each

42.00

1 Each

8.00

1 Each

164.00

1 Each

44.00

1 Each

142.00

1 Each

67.00

1 Each

209.00

1 Each

56.00

1 Each

69.00

1 Each

11.00

1 Each

243.00

1 Each

12.00

1 Each

48.00

1 Each

14.00

1 Each

243.00

1 Each

22.00

1 Each

314.00

1 Each

44.00

1 Each

71.00

1 Each

14.00

1 Each

48.00

1 Each

11.00

1 Each

228.00

1 Each

205.00

1 Each

26.00

1 Each

9.00

1 Each

100.00

1 Each

67.00

1 Each

44.00

1 Each

67.00

1 Each

102.00

1 Each

20.00

1 Each

35.00

1 Each

11.00

1 Each

42.00

1 Each

11.00

1 Each

95.00

1 Each

19.00

1 Each

8.00

1 Each

35.00

1 Each

7.00

1 Each

37.00

1 Each

9.00

1 Each

455.00

1 Each

100.00

1 Each

73.00

1 Each

22.00

1 Each

119.00

1 Each

35.00

1 Each

19.00

1 Each

11.00

1 Each

48.00

1 Each

11.00

1 Each

19.00

1 Each

9.00

1 Each

18.00

1 Each

7.00

1 Each

39.00

1 Each

11.00

1 Each

63.00

1 Rmt

70.00

1 Rmt

104.00

1 Rmt

132.00

1 Rmt

154.00

1 Rmt

43.00

1 Each

43.00

1 Each

43.00

1 Each

43.00

1 Each

1,939.00

1 Each

2,887.00

1 Each

140.00

1 Each

62.00

1 Each

11.00

1 Each

1,247.00

1 Each

140.00

1 Each

2,575.00

1 Each

356.00

1 Each

251.00

1 Sqm

273.00

1 Sqm

44.00

1 Sqm

624.00

10 Sqm

123.00

10 Sqm

36.00

1 Rmt

25.00

1 Each

9.00

1 Each

47.00

1 Each

11.00

1 Each

513.00

1 Each

116.00

1 Each

10.00

1 Each

1.00

1 Each

14.00

1 Each

1.00

1 Each

72.00

1 Each

9.00

1 Each

110.00

1 Each

11.00

1 Each

200.00

1 Each

19.00

1 Each

26.00

1 Each

8.00

1 Each

6,865.00

1 Each

506.00

1 Each

5,412.00

1 Each

491.00

1 Each

4,905.00

1 Each

449.00

1 Each

495.00

1 Each

5420.00

1 Each

233.00

1 Each

2481.00

1 Each

2,481.00

1 Each

705.00

1 Each

63.00

1 Each

396.00

1 Each

79.00

1 Each

55.00

1000 Lit

413.00

1 Each

617.00

1 Each

824.00

1 Each

349.00

1 Each

175.00

1 Each

1,721.00

1 Each

4,360.00

1 Each

7,332.00

1 Each

1,806.00

1 Each

3,084.00

1 Each

1,783.00

1 Each

3,453.00

1 Each

400.00

1 Each

1,704.00

1 Each

2,882.00

1 Each

419.00

1 Each

811.00

1 Each

5,509.00

1 Each

8,666.00

1 Each

2,556.00

1 Each

3,745.00

1 Each

14,600.00

1 Each

1,778.00

1 Each

2,554.00

1 Each

1,676.00

1 Each

2,460.00

1 Each

1,350.00

1 Each

2,377.00

1 Each

1,269.00

1 Each

2,073.00

1 Each

944.00

1 Each

1,954.00

1 Each

3,240.00

1 Each

2,271.00

1 Each

4,428.00

1 Each

3,213.00

1 Each

944.00

1 Each

1,173.00

1 Each

873.00

1 Each

379.00

1 Each

1,704.00

1 Each

379.00

1 Each

4,126.00

1 Each

1,762.00

1 Each

5,761.00

1 Each

1,345.00

1 Each

1,660.00

1 Each

1,308.00

1 Each

873.00

1 Each

1004.00

1 Each

750.00

1 Each

1,621.00

1 Each

1,093.00

1 Each

2,149.00

1 Each

3,844.00

1 Each

1,296.00

1 Each

1,296.00

1 Each

1,275.00

1 Each

1,704.00

1 Each

4,978.00

1 Each

7,503.00

1 Each

1,989.00

1 Each

2,113.00

1 Each

3,700.00

1 Each

14,532.00

1 Each

14,532.00

1 Each

2,408.00

1 Each

2,526.00

1 Each

157.00

1 Rmt

195.00

1 Rmt

244.00

1 Rmt

328.00

1 Rmt

431.00

1 Rmt

548.00

1 Rmt

227.00

1 Rmt

272.00

1 Rmt

336.00

1 Rmt

443.00

1 Rmt

575.00

1 Rmt

726.00

1 Rmt

185.00

1 Rmt

220.00

1 Rmt

267.00

1 Rmt

345.00

1 Rmt

442.00

1 Rmt

141.00

1 Rmt

160.00

1 Rmt

212.00

1 Rmt

289.00

1 Rmt

360.00

1 Rmt

525.00

1 Rmt

156.00

1 Rmt

189.00

1 Rmt

227.00

1 Rmt

310.00

1 Rmt

383.00

1 Rmt

560.00

1 Rmt

48.00

1 Rmt

73.00

1 Rmt

115.00

1 Rmt

180.00

1 Rmt

321.00

1 Rmt

504.00

1 Rmt

702.00

1 Rmt

963.00

1 Rmt

1,427.00

1 Rmt

66.00

1 Rmt

102.00

1 Rmt

163.00

1 Rmt

251.00

1 Rmt

449.00

1 Rmt

707.00

1 Rmt

999.00

1 Rmt

1,425.00

1 Rmt

2,134.00

1 Rmt

77.00

1 Rmt

118.00

1 Rmt

190.00

1 Rmt

292.00

1 Rmt

519.00

1 Rmt

819.00

1 Rmt

1,162.00

1 Rmt

1,579.00

1 Rmt

2,487.00

1 Rmt

11.00

1 Rmt

15.00

1 Rmt

21.00

1 Rmt

36.00

1 Rmt

70.00

1 Rmt

134.00

1 Rmt

204.00

1 Rmt

391.00

1 Rmt

696.00

1 Rmt

42.00

1 Each

67.00

1 Each

87.00

1 Each

138.00

1 Each

161.00

1 Each

411.00

1 Each

531.00

1 Each

18.00

1 Each

22.00

1 Each

43.00

1 Each

75.00

1 Each

140.00

1 Each

274.00

1 Each

443.00

1 Each

824.00

1 Each

1,530.00

1 Each

16.00

1 Each

28.00

1 Each

51.00

1 Each

90.00

1 Each

160.00

1 Each

325.00

1 Each

636.00

1 Each

922.00

1 Each

1,598.00

1 Each

7.00

1 Each

11.00

1 Each

21.00

1 Each

36.00

1 Each

63.00

1 Each

134.00

1 Each

225.00

1 Each

358.00

1 Each

708.00

1 Each

13.00

1 Each

22.00

1 Each

21.00

1 Each

31.00

1 Each

36.00

1 Each

35.00

1 Each

54.00

1 Each

55.00

1 Each

56.00

1 Each

57.00

1 Each

124.00

1 Each

124.00

1 Each

125.00

1 Each

126.00

1 Each

127.00

1 Each

184.00

1 Each

185.00

1 Each

235.00

1 Each

449.00

1 Each

476.00

1 Each

600.00

1 Each

698.00

1 Each

753.00

1 Each

35.00

1 Each

61.00

1 Each

62.00

1 Each

101.00

1 Each

103.00

1 Each

105.00

1 Each

146.00

1 Each

148.00

1 Each

152.00

1 Each

153.00

1 Each

423.00

1 Each

425.00

1 Each

431.00

1 Each

438.00

1 Each

445.00

1 Each

598.00

1 Each

607.00

1 Each

805.00

1 Each

855.00

1 Each

1,459.00

1 Each

1,517.00

1 Each

112.00

1 Each

115.00

1 Each

201.00

1 Each

205.00

1 Each

212.00

1 Each

327.00

1 Each

848.00

1 Each

676.00

1 Each

899.00

1 Each

1,733.00

1 Each

174.00

1 Each

180.00

1 Each

262.00

1 Each

274.00

1 Each

509.00

1 Each

597.00

1 Each

834.00

1 Each

1,283.00

1 Each

2,052.00

1 Each

120.00

1 Each

125.00

1 Each

193.00

1 Each

185.00

1 Each

216.00

1 Each

362.00

1 Each

180.00

1 Each

197.00

1 Each

261.00

1 Each

251.00

1 Each

541.00

1 Each

116.00

1 Each

127.00

1 Each

212.00

1 Each

22.00

1 Each

251.00

1 Each

352.00

1 Each

181.00

1 Each

193.00

1 Each

277.00

1 Each

283.00

1 Each

299.00

1 Each

552.00

1 Each

466.00

1 Each

698.00

1 Each

932.00

1 Each

1,306.00

1 Each

2,099.00

1 Each

3,334.00

1 Each

534.00

1 Each

710.00

1 Each

932.00

1 Each

1,165.00

1 Each

2,215.00

1 Each

3,732.00

1 Each

102.00

1 Each

119.00

1 Each

196.00

1 Each

186.00

1 Each

245.00

1 Each

257.00

1 Each

526.00

1 Each

613.00

1 Each

992.00

1 Each

1,633.00

1 Each

2,333.00

1 Each

11.00

1 Each

14.00

1 Each

16.00

1 Each

18.00

1 Each

29.00

1 Rmt

49.00

1 Rmt

as applicable.

Para 113 of APPWD code. Authority

SS RATE for
2013-14
5 4

71.30

1 Mtr

83.20

1 Mtr

124.70

1 Mtr

126.00

1 Mtr

178.20

1 Mtr

24.00

1 No

24.00

1 No

63.00

1 No

74.00

1 No

133.00

1 No

39.00

1 No

89.00

1 No

92.00

1 No

22.00

1 No

22.00

1 No

55.00

1 No

67.00

1 No

114.00

1 No

23.00

1 No

24.00

1 No

63.00

1 No

74.00

1 No

133.00

1 No

21.00

1 No

21.00

1 No

53.00

1 No

65.00

1 No

108.00

1 No

206.00

100 Nos

256.00

100 Nos

475.00

100 Nos

642.00

100 Nos

1272.00

100 Nos

211.00

100 Nos

220.00

100 Nos

363.00

100 Nos

386.00

100 Nos

446.00

100 Nos

113.00

100 Nos

149.00

100 Nos

244.00

100 Nos

308.00

100 Nos

375.00

100 Nos

57.00

12 Nos

72.00

12 Nos

108.00

12 Nos

129.00

12 Nos

172.00

12 Nos

212.00

12 Nos

212.00

12 Nos

207.00

12 Nos

19.10

1 Mtr

24.20

1 Mtr

25.40

1 Mtr

31.80

1 Mtr

42.50

1 Mtr

58.40

1 Mtr

81.40

1 Mtr

13.90

1 Mtr

18.50

1 Mtr

18.50

1 Mtr

24.30

1 Mtr

32.30

1 Mtr

42.70

1 Mtr

48.50

1 Mtr

25.40

1 Mtr

31.80

1 Mtr

36.90

1 Mtr

63.50

1 Mtr

17.30

1 Mtr

18.50

1 Mtr

24.30

1 Mtr

35.80

1 Mtr

3.70

1 Mtr

4.90

1 Mtr

6.10

1 Mtr

12.20

1 Mtr

19.40

1 Mtr

11.00

1 No

14.00

1 No

28.00

1 No

30.00

1 No

61.00

1 No

17.00

1 No

19.00

1 No

34.00

1 No

37.00

1 No

51.00

1 No

22.00

1 No

25.00

1 No

40.00

1 No

43.00

1 No

64.00

1 No

4.00

1 No

6.00

1 No

16.00

1 No

19.00

1 No

28.00

1 No

4.00

1 No

Err:512
57.00

1 No

80.00

1 No

96.00

1 No

130.00

1 No

170.00

1 No

209.00

1 No

53.00

1 No

63.00

1 No

79.00

1 No

105.00

1 No

184.00

1 No

236.00

1 No

10

1 No

18

1 No

22

1 No

30

1 No

48

1 No

73

1 No

109

1 No

14.00

1 No

25.00

1 No

33.00

1 No

44.00

1 No

73.00

1 No

109.00

1 No

164.00

1 No

53.00

1 No

51.00

1 No

182.00

1 No

262.00

1 No

327.00

1 No

59.00

100 Nos

72.00

100 Nos

89.00

100 Nos

96.00

100 Nos

108.00

100 Nos

131.00

100 Nos

1051.00

100 Mtrs

1555.00

100 Mtrs

2510.00

100 Mtrs

3833.00

100 Mtrs

5828.00

100 Mtrs

9030.00

100 Mtrs

14280.00

100 Mtrs

924.00

100 Mtrs

1358.00

100 Mtrs

2195.00

100 Mtrs

3360.00

100 Mtrs

5250.00

100 Mtrs

7980.00

100 Mtrs

13230.00

100 Mtrs

797.00

100 Mtrs

1150.00

100 Mtrs

1856.00

100 Mtrs

2783.00

100 Mtrs

4305.00

100 Mtrs

6825.00

100 Mtrs

10500.00

100 Mtrs

4190.00

100 Mtrs

6683.00

100 Mtrs

10274.00

100 Mtrs

5736.00

100 Mtrs

9227.00

100 Mtrs

14065.00

100 Mtrs

7392.00

100 Mtrs

11771.00

100 Mtrs

17915.00

100 Mtrs

737.00

100 Mtrs

1497.00

100 Mtrs

1611.00

100 Mtrs

2693.00

100 Mtrs

3017.00

100 Mtrs

3629.00

100 Mtrs

6804.00

100 Mtrs

1040.00

100 Mtrs

5717.00

100 Mtrs

8778.00

100 Mtrs

13167.00

100 Mtrs

19404.00

100 Mtrs

31523.00

100 Mtrs

18.00

1 No

21.00

1 No

20.00

1 No

27.00

1 No

20.00

1 No

35.00

1 No

21.00

1 No

65.00

1 No

65.00

1 No

102.00

1 No

50.00

1 No

220.00

1 No

21.00

1 No

20.00

1 No

17.00

1 No

48.00

1 No

26.00

1 No

32.00

1 No

106.00

1 No

50.00

1 No

45.00

1 No

102.00

1 No

240.00

1 No

450.00

1 No

21.00

1 No

310.00

1 No

410.00

1 No

15.00

1 No

19.00

1 No

15.00

1 No

20.00

1 No

18.00

1 No

28.00

1 No

18.00

1 No

55.00

1 No

55.00

1 No

85.00

1 No

44.00

1 No

180.00

1 No

16.00

1 No

85.00

1 No

Err:512
23.00

1 No

26.00

1 No

24.00

1 No

35.00

1 No

28.00

1 No

26.00

1 No

28.00

1 No

39.00

1 No

80.00

1 No

110.00

1 No

49.00

1 No

240.00

1 No

54.00

1 No

35.00

1 No

40.00

1 No

92.00

1 No

101.00

1 No

93.00

1 No

141.00

1 No

117.00

1 No

137.00

1 No

126.00

1 No

126.00

1 No

138.00

1 No

138.00

1 No

188.00

1 No

196.00

1 No

158.00

1 No

473.00

1 No

100.00

1 No

98.00

1 No

63.00

1 No

75.00

1 No

64.00

1 No

93.00

1 No

75.00

1 No

90.00

1 No

83.00

1 No

83.00

1 No

95.00

1 No

91.00

1 No

133.00

1 No

135.00

1 No

65.00

1 No

375.00

1 No

65.00

1 No

64.00

1 No

65.00

1 No

77.00

1 No

89.00

1 No

130.00

1 No

172.00

1 No

210.00

1 No

56.00

1 No

69.00

1 No

81.00

1 No

180.00

1 No

137.00

1 No

167.00

1 No

1351.00

1 No

2329.00

1 No

5578.00

1 No

7280.00

1 No

8740.00

1 No

13455.00

1 No

22759.00

1 No

1129.00

1 No

1692.00

1 No

3827.00

1 No

5783.00

1 No

6521.00

1 No

9960.00

1 No

16538.00

1 No

4135.00

1 No

7828.00

1 No

10474.00

1 No

14884.00

1 No

22712.00

1 No

27012.00

1 No

3749.00

1 No

7283.00

1 No

9639.00

1 No

13709.00

1 No

21313.00

1 No

25597.00

1 No

1438.00

1 No

1318.00

1 No

4594.00

1 No

7006.00

1 No

760.00

1 No

2670.00

1 No

5019.00

1 No

936.00

1 No

1446.00

1 No

3302.00

1 No

6148.00

1 No

6190.00

1 No

9025.00

1 No

620.00

1 No

1033.00

1 No

2350.00

1 No

4597.00

1 No

4730.00

1 No

7747.00

1 No

0.00
50.00

1 No

77.00

1 No

248.00

1 No

363.00

1 No

704.00

1 No

1425.00

1 No

0.00
99.00

1 No

123.00

1 No

259.00

1 No

484.00

1 No

891.00

1 No

1182.00

1 No

0.00
8000.00

1 No

15000.00

1 No

6400.00

1 No

12000.00

1 No

0.00
6060.00

7149.00

1 No

16025.00

1 No

21690.00

1 No

6813.00

1 No

8700.00

1 No

20818.00

1 No

26208.00

1 No

4229.00

1 No

4807.00

1 No

No

14823.00

1 No

5668.00

1 No

6322.00

1 No

18010.00

1 No

22890.00

1 No

0.00
104444.00

1 No

129841.00

1 No

139793.00

1 No

173147.00

1 No

147276.00

1 No

182744.00

1 No

154780.00

1 No

194892.00

1 No

94000.00

1 No

116857.00

1 No

125813.00

1 No

155832.00

1 No

132548.00

1 No

164470.00

1 No

13328.00

1 No

5385.00

1 No

4665.00

1 No

34800.00

1 No

15000.00

1 No

46550.00

1 No

10413.00

1 No

32750.00

1 No

40850.00

1 No

44550.00

1 No

41600.00

1 No

16573.00

1 No

0.00
201.00

1 No

423.00

1 No

595.00

1 No

962.00

1 No

955.00

1 No

1477.00

1 No

1281.00

1 No

1899.00

1 No

162.00

1 No

356.00

1 No

512.00

1 No

701.00

1 No

818.00

1 No

1134.00

1 No

1062.00

1 No

1424.00

1 No

121.00

1 No

221.00

1 No

335.00

1 No

501.00

1 No

612.00

1 No

945.00

1 No

787.00

1 No

1112.00

1 No

Err:512
338.00

1 No

367.00

1 No

488.00

1 No

624.00

1 No

725.00

1 No

814.00

1 No

890.00

1 No

956.00

1 No

318.00

1 No

334.00

1 No

411.00

1 No

585.00

1 No

590.00

1 No

678.00

1 No

734.00

1 No

918.00

1 No

215.00

1 No

258.00

1 No

345.00

1 No

383.00

1 No

428.00

1 No

572.00

1 No

2700.00

1 No

3300.00

1 No

2900.00

1 No

3330.00

1 No

2970.00

1 No

3515.00

1 No

3515.00

1 No

4000.00

1 No

2152.00

1 No

2902.00

1 No

2118.00

1 No

2780.00

1 No

2647.00

1 No

3019.00

1 No

2558.00

1 No

2947.00

1 No

1880.00

1 No

760.00

1 No

880.00

1 No

1045.00

1 No

990.00

1 No

1245.00

1 No

1505.00

1 No

463.00

1 No

606.00

1 No

695.00

1 No

800.00

1 No

1130.00

1 No

1350.00

1 No

328.00

1 No

446.00

1 No

547.00

1 No

551.00

1 No

756.00

1 No

957.00

1 No

1500.00

1 No

2200.00

1 No

4205.00

1 No

2491.00

1 No

3750.00

1 No

5429.00

1 No

5125.00

1 No

6322.00

1 No

9202.00

1 No

6045.00

1 No

7000.00

1 No

7770.00

1 No

10078.00

1 No

6500.00

1 No

7800.00

1 No

7843.00

1 No

9823.00

1 No

901.00

1 No

1915.00

1 No

2287.00

1 No

1500.00

1 No

2200.00

1 No

3000.00

1 No

2200.00

1 No

3500.00

1 No

5000.00

1 No

3800.00

1 No

5250.00

1 No

6800.00

1 No

5600.00

1 No

7100.00

9100.00

1 No

4900.00

1 No

6200.00

1 No

680.00

1 No

1275.00

1 No

1770.00

1 No

2200.00

1 No

1650.00

1 No

1900.00

1 No

2200.00

1 No

2800.00

1 No

2700.00

1 No

3500.00

1 No

4700.00

1 No

2700.00

1 No

4700.00

1 No

6300.00

1 No

590.00

1 No

925.00

1 No

1300.00

1 No

250.00

1 No

366.00

1 No

1400.00

1 No

1300.00

1 No

1100.00

1 No

3628.00

1 No

3381.00

1 No

2856.00

1 No

5327.00

1 No

4698.00

1 No

4418.00

1 No

6119.00

1 No

5592.00

1 No

4820.00

1 No

5376.00

1 No

4557.00

1 No

3749.00

1 No

6993.00

1 No

6432.00

1 No

6069.00

1 No

7431.00

1 No

6615.00

1 No

7540.00

1 No

6799.00

1 No

6069.00

1 No

14561.00

1 No

13138.00

1 No

8414.00

1 No

7328.00

1 No

6407.00

1 No

16413.00

1 No

14394.00

1 No

711.00

1 No

636.00

1 No

536.00

1 No

1667.00

1 No

1355.00

1 No

1071.00

1 No

2250.00

1 No

1838.00

1 No

3822.00

1 No

709.00

1 No

643.00

1 No

775.00

1 No

652.00

1 No

756.00

1 No

643.00

1 No

615.00

1 No

1182.00

1 No

1005.00

1 No

902.00

1 No

1701.00

1 No

1428.00

1 No

1223.00

1 No

2457.00

1 No

2089.00

1 No

1696.00

1 No

180.00

1 No

120.00

1 No

200.00

1 No

240.00

1 No

320.00

1 No

519.00

1 No

579.00

1 No

2450.00

No

3350.00

No

4200.00

No

5400.00

No

5000.00

1 No

5500.00

1 No

6500.00

1 No

7250.00

1 No

8000.00

1 No

16000.00

1 No

108.00

1 No

80.00

1 No

60.00

1 No

130.00

1 No

100.00

1 No

80.00

1 No

495.00

1 No

450.00

1 No

400.00

1 No

710.00

1 No

650.00

1 No

600.00

1 No

770.00

1 No

720.00

1 No

680.00

1 No

840.00

1 No

800.00

1 No

780.00

1 No

605.00

1 No

580.00

1 No

530.00

1 No

900.00

1 No

850.00

1 No

800.00

1 No

890.00

1 No

850.00

1 No

990.00

1 No

950.00

1 No

900.00

1 No

1350.00

1 No

1200.00

1 No

1100.00

1 No

1540.00

1 No

1450.00

1 No

1400.00

1 No

180.00

1 No

160.00

1 No

140.00

1 No

190.00

1 No

170.00

1 No

150.00

1 No

450.00

1 No

420.00

1 No

400.00

1 No

640.00

1 No

620.00

1 No

600.00

1 No

10978.00

1 No

11518.00

1 No

13140.00

1 No

13140.00

1 No

14221.00

1 No

18026.00

1 No

678.00

1 No

578.00

1 No

599.00

1 No

813.00

1 No

766.00

1 No

1222.00

1 No

1173.00

1 No

273.00

1 No

231.00

1 No

2593.50

1 No

2369.20

1 No

4218.00

1 No

3347.00

1 No

3749.00

1 No

2901.00

1 No

898.00

1 No

758.00

1 No

1067.00

1 No

1011.00

1 No

1148.00

1 No

1033.00

1 No

1472.00

1 No

1347.00

1 No

741.00

1 No

667.00

1 No

978.00

1 No

878.00

1 No

140.00

1 No

126.00

1 No

110.00

1 No

140.00

1 No

120.00

1 No

110.00

1 No

180.00

1 No

160.00

1 No

146.00

1 No

180.00

1 No

160.00

1 No

145.00

1 No

180.00

1 No

160.00

1 No

145.00

1 No

210.00

1 No

180.00

1 No

170.00

1 No

11.00

1 No

9.00

1 No

8.00

1 No

21.00

1 No

19.00

1 No

17.00

1 No

53.00

1 No

48.00

1 No

42.00

1 No

32.00

1 No

27.00

1 No

25.00

1 No

15.00

1 No

13.00

1 No

12.00

1 No

693.00

1 No

614.00

1 No

275.00

1 No

1615.00

1 No

4779.00

1 No

950.00

No

608.00

No

12.00

1 No

10.00

1 No

11.00

1 No

41.00

1 No

39.00

1 No

38.00

1 No

45.00

1 No

40.00

1 No

38.00

1 No

120.00

1 No

75.00

1 No

70.00

1 No

80.00

1 No

75.00

1 No

105.00

1 No

100.00

1 No

115.00

1 No

110.00

1 No

160.00

1 No

150.00

1 No

135.00

1 No

130.00

1 No

115.00

1 No

110.00

1 No

125.00

1 No

120.00

1 No

135.00

1 No

130.00

1 No

110.00

1 No

100.00

1 No

180.00

1 No

150.00

1 No

170.00

1 No

150.00

1 No

200.00

1 No

180.00

1 No

200.00

1 No

180.00

1 No

100.00

1 No

80.00

1 No

110.00

1 No

80.00

1 No

130.00

1 No

115.00

1 No

125.00

1 No

110.00

1 No

80.00

1 No

350.00

1 No

425.00

1 No

495.00

1 No

425.00
100.00

1 No

80.00

1 No

110.00

1 No

80.00

1 No

130.00

1 No

115.00

1 No

125.00

1 No

110.00

1 No

200.00

1 No

180.00

1 No

230.00

1 No

210.00

1 No

950.00

1 No

1060.00

1 No

4100.00

1 No

800.00

1 No

2040

1633

2762.00

1 No

2186.00

1 No

3506.00

2880.00

4537.00

1 No

3280.00

1 No

1935.00

1572.00

2070.00

1600.00

7680.00

6825.00

7875.00

6510.00

No

9280.00

No

500.00

No

750.00

No

1 No

9467.00
14415.00
20000.00
26250.00

37312.00
49000.00
55000.00
61000.00
67000.00
1 No

7199
9450
13650
21700

17513.00

1 No

19752.00

1 No

22358.00

1 No

24363.00

1 No

28750.00

1 No

15228.00

1 No

17175.00

1 No

19465.00

1 No

21185.00

1 No

25000.00

1 No

18719.00

No

21045.00

No

23690.00

No

25645.00

No

27600.00

No

52670.00

No

16340.00

No

18300.00

No

20600.00

No

22300.00

No

24000.00

No

45800.00

No

17825.00

No

20125.00

No

22425.00

No

15500.00

No

17500.00

No

19500.00

No

92.00

1 Mtr

78.00

1 Mtr

74.00

1 Mtr

108.00

1 Mtr

93.00

1 Mtr

87.00

1 Mtr

129.00

1 Mtr

112.00

1 Mtr

104.00

1 Mtr

130.00

1 Mtr

112.00

1 Mtr

104.00

1 Mtr

147.00

1 Mtr

128.00

1 Mtr

118.00

1 Mtr

162.00

1 Mtr

140.00

1 Mtr

131.00

1 Mtr

207.00

1 Mtr

180.00

1 Mtr

166.00

1 Mtr

247.00

1 Mtr

212.00

1 Mtr

197.00

1 Mtr

326.00

1 Mtr

280.00

1 Mtr

261.00

1 Mtr

421.00

1 Mtr

363.00

1 Mtr

337.00

1 Mtr

547.00

1 Mtr

472.00

1 Mtr

439.00

1 Mtr

669.00

1 Mtr

579.00

1 Mtr

537.00

1 Mtr

762.00

1 Mtr

658.00

1 Mtr

613.00

1 Mtr

934.00

1 Mtr

806.00

1 Mtr

1185.00

1 Mtr

1023.00

1 Mtr

1449.00

1 Mtr

1251.00

1 Mtr

1815.00

1 Mtr

1568.00

1 Mtr

603.00

1 No

683.00

1 No

816.00

1 No

972.00

1 No

1104.00

1 No

1248.00

1 No

1475.00

1 No

327.00

1 No

491.00

1 No

578.00

1 No

654.00

1 No

94.00

1 No

138.00

1 No

264.00

1 No

22.00

1 No

30.00

1 No

33.00

1 No

40.00

1 No

55.00

1 No

65.00

1 No

88.00

1 No

104.00

1 No

149.00

1 No

215.00

1 No

284.00

1 No

418.00

1 No

12.00

1 No

14.00

1 No

17.00

1 No

20.00

1 No

25.00

1 No

27.00

1 No

35.00

1 No

40.00

1 No

46.00

1 No

71.00

1 No

92.00

1 No

119.00

1 No

1300.00

1 No

1545.00

1 No

2230.00

1 No

4000.00

1 No

5425.00

1 No

15070.00

1 No

18095.00

1 No

23018.00

1 No

8211.00

1 No

8321.00

1 No

8925.00

1 No

12452.00

1 No

12562.00

1 No

13750.00

1 No

97.00

1 Mtr

124.00

1 Mtr

152.00

1 Mtr

163.00

1 Mtr

254.00

1 Mtr

376.00

1 Mtr

494.00

1 Mtr

576.00

1 Mtr

1300.00

1 Mtr

960.00

1 Mtr

845.00

1 Mtr

725.00

1 Mtr

400.00

Mtr

200.00

Mtr

300.00

Mtr

550.00

Mtr

1600.00

1 No

1825.00

1 No

2020.00

1 No

1675.00

1 No

2160.00

1 No

2352.00

1 No

2714.00

1 No

6000.00

1 No

6600.00

1 No

1550.00

1 No

1350.00

1 No

1265.00

1 No

2645.00

1 No

3220.00

1 No

4100.00

1 No

8866.00

1 No

10438.00

1 No

381.00

1 No

263.00

1 No

263.00

1 No

158.00

1 No

780.00

1 No

1450.00

1 No

60.00

1 No

2490.00

1 No

14700.00

1 No

14000.00

1 No

16800.00

1 No

16000.00

1 No

17352.00

1 No

16500.00

1 No

21000.00

1 No

20000.00

1 No

25200.00

1 No

24000.00

1 No

23625.00

1 No

22500.00

1 No

28350.00

1 No

27000.00

1 No

30975.00

1 No

29500.00

1 No

32500.00

1 No

37,800.00

1 No

36,000.00

1 No

36,000.00

1 No

11550.00

1 No

11000.00

1 No

13125.00

1 No

12500.00

1 No

17850.00

1 No

17000.00

1 No

17850.00

1 No

17000.00
22050.00

1 No

21000.00

26250.00

1 No

25000.00

33600.00

1 No

32000.00
5145.00

1 No

4900.00
7455.00

1 No

7100.00

1 No

9975.00

1 No

9500.00

1 No

12600.00

1 No

12000.00

1 No

14700.00

1 No

14000.00

1 No

19950.00

1 No

19000.00

1 No

24150.00
23000.00

1 No

4800.00

1 No

1000.00

1 Set

1000.00

1 Mtr

8150.00

1 No

9250.00

1 No

1590.00

1 No

156.00

1 No

410.00

1 No

180.00

1 No

220.00

1 No

225.00

1 No

485.00

1 No

225.00

1 No

475.00

1 No

325.00

1 No

350.00

1 No

560.00

1 No

427.00

1 No

1700.00

1 No

115.00

1 No

1500.00

1 No

2100.00

1 No

720.00

1 No

3100.00

1 No

3750.00

1 No

1590.00

1 No

125.00

1 No

40.00

1 No

1500.00

1 No

400.00

1 No

3000.00

1 No

2500.00

1 No

2000.00

Set

1500.00

Mtr

1750.00

Mtr

40811.00

No

38535.00

No

48650.00

No

46725.00

No

49035.00

No

56490.00

No

49980.00

No

57645.00

No

57865.00

No

57222.00

No

65195.00

No

67295.00

No

82000.00

No

130090.00

No

109500.00

No

137940.00

No

131800.00

No

125000.00

No

150970.00

No

115000.00

No

116300.00

No

155170.00

No

133000.00

No

168190.00

No

80000.00

No

82500.00

No

72975.00
78225.00
990.00

1 No

810.00

1 No

1805.00

1 No

1615.00

1 No

2500.00

1 No

2300.00

1 No

3325.00

1 No

3135.00

1 No

4002.00

1 No

3806.00

1 No

179.00

1 No

231.00

1 No

306.00

1 No

319.00

1 No

489.00

1 No

84.00

1 No

40.00

1 No

38.00

1 No

795069.00

1 No

71.00

1 Kg

65.00

1 Kg

65.00

1 Kg

10647.00

1 No

9147.00

1 No

15722.00

1 No

13570.00

1 No

15665.00

1 No

14098.00

No

25040.00

No

22536.00

No

1215.00

No

1604.00

No

1400.00

No

2479.00

No

No

4500.00

18102.00

16292.00

No

4950.00

No

103354.00

No

88790.00

No

134879.00

No

121391.00

No

145000.00

No

130500.00

No

168256.00

No

151430.00

No

28884.00

No

30473.00

No

28073.00

No

35794.00

No

45551.00

No

18698.00

No

16828.00

No

14580.00

No

13122.00

No

16740.00

No

15066.00

No

1220.00
1750.00

2385.00
2830.00
3200.00

No

8908.00

No

11168.00

No

14275.00

No

18795.00

No

27268.00

No

1650.00

No

1650.00

No

1980.00
2310.00
5500.00

1
1
1

No
No
No

2.60

1 sq.
inch

2.40

1 sq.
inch

2.10

1 sq.
inch

2500.00

1 No

450.00

1 No

2500.00

1 No

450.00

1 No

4556.00

1 No

2700.00

1 No

10023.00

1 No

175.00

1 No

135.00

1 No

450.00

1 No

1050.00

1 No

3037.00

1 No

13600.00

1 No

16900.00

1 No

1998.00

1 No

2500.00

1 No

4350.00

1 No

500.00

1 No

2500.00

1 No

3500.00

1 No

750.00

1 No

1050.00

1 No

300.00

1 No

550.00

1 No

700.00

1 No

1450.00

1 No

590.00

1 Kg

390.00

1 Kg

300.00

1 No

3000.00

1 No

4000.00

1 No

350.00

1 No

380.00

1 No

165.00

1 No

175.00

1 No

300.00

1 No

500.00

1 No

1300.00

1 No

2000.00

1 No

3000.00

1 No

4200.00

1 No

4500.00

1 No

6800.00

1 No

90.00

1 Ltr

8.00

1 Ltr

5.00

1 Ltr

330.00

1 KVAR

165000.00
180000.00
295000.00
325000.00
375000.00
550000.00

400000.00
645000.00
735000.00
910000.00
1500.00

1 No

600.00

1 No

300.00

1 No

675.00

1 No

90.00

1 No

600.00

1 No

7000.00

1 No

6100.00

1 No

5900.00

1 No

4000.00

1 No

25013.00

1 Km

15383.00

1 Km

3129.00

1 No

1665.00

1 No

50.00

1 Kg

128000.00

1 No

31200.00

1 No

16000.00

1 Pt

9600.00

1 Pt

410.00

1 Mtr

1010.00

100

Mtrs

2800.00

100

Mtrs

2580.00

100

Mtrs

340.00

No

5200.00

No

1235.00

No

12500.00
220.00

1
1

No
No

200.00

No

6500.00

No

3680.00

No

387.00

40.00

Mtr

76.00

Mtr

195.00

Mtr

650.00

No

990.00

No

2070.00

No

7900.00

No

4700.00

No

Mtrs

5580.00

No

6484.00

No

7348.00

No

10125.00

No

13500.00

No

75.00

Mtrs

105.00

Mtrs

7500.00

No

9500.00

No

2000.00

No

350.00

No

250.00

No

460.00

Mtrs

605.00

Mtrs

1035.00

Mtrs

435.00

Mtrs

560.00

Mtrs

1010.00

Mtrs

340.00

No

430.00

No

830.00

No

215.00

1 No

385.00

1 No

193.00

1 No

396.00

1 No

165.00

100 Nos

28.00

100 Nos

44.00

100 Nos

55.00

144 Nos

13.00

1 Set

24.00

1 Set

44.00

1 Doz

73.00

1 Doz

9.00

1 Kg

4.00

1 Kg

330.00

100 Nos

440.00

100 Nos

61.00

1 No

17.00

1 No

13.00

1 No

303.00

Pair

194.00

1 Set

51.00

1 No

22.00

1 No

66.00

1 Rm

88.00

1 No

66.00

1 No

83.00

1 No

242.00

1 Set

61.00

1 Kg

17.00

1 No

7.00

1 No

83.00

1 No

22.00

1 Sqft

1100.00

1 No

154.00

1 No

605.00

1 Kg

605.00

1 Kg

726.00

1 Kg

605.00

1 Kg

701.00

1 Kg

68.00

1 Kg

234.00

1 Kg

322.00

1 Kg

91.00

25 Nos

97.00

25 Nos

16500.00

1 No

67.00

1 Kg

266.00

1 Kg

165.00

1 Kg

6.60

1 Kg

0.60

1 Sqin

220.00

1 Cum

594.00

1 Cum

3819.00

1,000 Nos

226.00

1 Mtr

242.00

1 Mtr

323.00

1 Mtr

346.00

1 Mtr

5.00

1 No

10.00

1 Set

200.00

1 No

250.00

1 No

110.00

1 No

226.00

100 Nos

226.00

100 Nos

285.00

100 Nos

347.00

100 Nos

495.00

100 Nos

550.00

100 Nos

660.00

100 Nos

825.00

100 Nos

1100.00

100 Nos

88.00

1 No

440.00

1 No

375.00

1 No

385.00

1 No

345.00

1 No

385.00

1 No
1 No

385.00

1 No

345.00

1 No

345.00

1 No

385.00

1 No

345.00

1 No

295.00

1 No

385.00

1 No

345.00

1 No

440.00

1 No

345.00

1 No

550.00

1 No

735.00

1 No

440.00

1 No

485.00

1 No

42171.00

1 No

9961.00

1 No

13946.00

1 No

6973.00

1 No

688750.00

1 No

641250.00

1 No

498750.00

1 No

446500.00

1 No

460750.00

1 No

413250.00

1 No

308750.00

1 No

275500.00

1 No

261250.00

1 No

232750.00

1 No

237500.00

1 No

209000.00

1 No

118750.00

No

106400.00

No

6413.00

No

5700.00

No

6223.00

No

5605.00

No

6365.00

No

5700.00

No

5059.00

No

4560.00

No

6175.00

No

5558.00

No

5225.00

No

4655.00

No

5225.00

No

4655.00

No

4275.00

No

3800.00

No

7500.00

No

9000.00

No

12500.00

No

14500.00

No

18500.00

No

20500.00

No

25000.00

No

12500.00

No

675.00

No

650.00

No

150.00

No

1800.00

No

1750.00

No

1700.00

No

9009.00

No

6394.00

No

6161.00

No

3981.00

No

4142.00

No

2693.00

No

6625.00

No

5339.00

No

13870.00

No

24415.00

No

9961.00

No

7467.00

No

2100.00

No

3100.00

No

4100.00

No

1300.00

No

15010.00

No

1200.00

Set

1000.00

Set

354000.00

Set

390000.00

Set

446400.00

Set

468000.00

Set

678000.00

Set

762000.00

Set

268750.00

Set

556250.00

Set

218750.00

Set

443750.00

Set

161250.00

Set

387500.00

Set

55000.00

Set

77860.00

Set

62450.00

1 Set

48400.00

1 Set

46245.00

1 Set

42542.00

1 Set

3245.00

1 Mtr

3210.00

1 Mtr

2800.00

1 Mtr

2400.00

1 Mtr

1930.00

1 Mtr

1515.00

1 Mtr

1275.00

1 Mtr

1000.00

1 Mtr

895.00

1 Mtr

750.00

1 Mtr

675.00

1 Mtr

600.00

1 Mtr

530.00

1 Mtr

512.00

1 Mtr

400.00

1 Mtr

330.00

1 Mtr

300.00

1 Mtr

270.00

1 Mtr

8125.00

1 No

12525.00

1 No

5300.00

1 No

4350.00

1 No

3400.00

1 No

3100.00

1 No

5000.00

1 No

4000.00

1 No

3725.00

1 No

3500.00

1 No

1723.00

1 No

17007.00
11849.00
7631.00
5088.00
3812.00
3067.00

1
1
1
1
1
1

No
No
No
No
No
No

1750.00
1400.00
1250.00

1
1
1

No
No
No

6140.00

No

5510.00

1 No

7500.00

1 No

3250.00

1 No

2530.00

1 No

9100.00

1 No

6900.00

1 No

16000.00

1 No

490.00

1 No

2,500.00

1 No

5,375.00

1 No

7,500.00

1 No

675.00

1 No

1,175.00

1 No

650.00

1 No

1,250.00

1 No

9,500.00

1 No

24790.00

1 Ea

13280.00

1 Ea

7450.00

1 Ea

5100.00

1 Ea

AS per
Civil
SSR

45.00

1 Mts

40.00

1 Mts

30.00

1 Mts

60.00

1 Kg

110.00

1 Mtr

150.00

1 Mtr

252.00

1 Mtr

214.00

1 Mtr

385875.00

1 No

496125.00

1 No

617400.00

1 No

771750.00

1 No

1047375.00

1 No

1433250.00

1 No

2205000.00

1 No

2866500.00

1 No

9500.00

1 No

13500.00

1 No

19200.00

29400.00

No

39507.00

No

68250.00

No

94500.00

No

110250.00

No

1500.00
2875.00
5175.00
3850.00

1
1
1
1

No
No
No
No

6446.00

No

7970.00

No

9900.00

No

10500.00

No

9965.00

No

12750.00

No

PWD code. Authority who prepares the estimate


3500.00
1 No
1723.00

1 No

17007.00
11849.00
7631.00
5088.00
3812.00
3067.00

1
1
1
1
1
1

No
No
No
No
No
No

1750.00
1400.00
1250.00

1
1
1

No
No
No

6140.00

No

5510.00

1 No

7500.00

1 No

3250.00

1 No

2530.00

1 No

9100.00

1 No

6900.00

1 No

16000.00

1 No

490.00

1 No

2,500.00

1 No

5,375.00

1 No

7,500.00

1 No

675.00

1 No

1,175.00

1 No

650.00

1 No

1,250.00

1 No

9,500.00

1 No

24790.00

1 Ea

13280.00

1 Ea

7450.00

1 Ea

5100.00

1 Ea
AS per
Civil
SSR

45.00

1 Mts

40.00

1 Mts

30.00

1 Mts

60.00

1 Kg

86.00

1 Mtr

110.00

1 Mtr

150.00

1 Mtr

252.00

1 Mtr

214.00

1 Mtr

385875.00

1 No

496125.00

1 No

617400.00

1 No

771750.00

1 No

1047375.00

1 No

1433250.00

1 No

2205000.00

1 No

2866500.00

1 No

9500.00

1 No

13500.00

1 No

19200.00

29400.00

No

39507.00

No

68250.00

No

94500.00

No

110250.00

No

1500.00
2875.00
5175.00
3850.00

1
1
1
1

No
No
No
No

6446.00

No

7970.00

No

9900.00

No

10500.00

No

9965.00

No

12750.00

No

PWD code. Authority who prepares the estimate

Page 1193 of 3205

DATA- PIPES
Sn.
41

*A
*

Description
COST OF PIPES, LOWERING AND JOINTING CHARGES
Cost of DI pipes as per separate sheet

Lowering of DI pipes
Sub Analysis for Lowering
Lowering C.I. Pipes, A class and specials with s/s ends carefully into trench and laying them true to alignment and
but excluding cost and conveyance of pipes from source of supply. (Reference to specifications. BIS No.3114/94)
Assumtion 10 m
200 mm dia CI pipes 5m long (class A)
Weight = 2 x 257 kgs = 514 kgs = 5.14 quintal
(a) LABOUR:
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
(b) Cost for 10 metres
Rate per metre = b/10
Rate for 1 kg = b/514

42

Quantity

0.102 day
0.238 day
1.330 day

PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into tren
alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supp
No.3114/1994)

Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be as per sub-analysis ma
S/s ends.
Details of cost for 5m
Lowering 80 mm dia DI pipe
Weight of 5m length = (79 +85.5 + 92)/3 = 85.5 kgs
(a) Labour charges for laying
85.500 Kg
(b) Overheads & Contractors Profit
14%
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
0%
Rate per each cut
Lowering 100 mm dia DI pipe
Weight of 5m length = (100+109+117)/3 = 108.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

108.670 Kg
14%

0%
Rate per each cut

Lowering 125 mm dia DI pipe


Weight of 5m length = (130+141+153)/3 = 141.33 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

141.330 Kg
14%

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1194 of 3205

Lowering 150mm dia DI pipe


Weight of 5m length = (162+178+191)/3 = 177 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

177.000 Kg
14%

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1195 of 3205

Lowering 200 mm dia DI pipe


Weight of 5m length = (237+257+278)/3 = 257.33 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

257.330 Kg
14%

0%
Rate per each cut

Lowering 250 mm dia DI pipe


Weight of 5m length = (319+348+376)/3 = 347.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

347.670 Kg
14%

0%
Rate per each cut

Lowering 300 mm dia DI pipe


Weight of 5m length = (412+450+487)/3 = 449.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

449.670 Kg
14%

0%
Rate per each cut

Lowering 350 mm dia DI pipe


Weight of 5m length =(519+563+610)/3=564
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

564.000 Kg
14%

0%
Rate per each cut

Lowering 400 mm dia DI pipe


Weight of 5m length =(631+690+744)/3=688.33
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

688.330 Kg
14%

0%
Rate per each cut

Lowering 450mm dia DI pipe


Weight of 5m length =(761+836+901)/3=832.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

832.670 Kg
14%

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1196 of 3205

Lowering 500 mm dia DI pipe


Weight of 5m length =(892+971+1049)/3=970.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

970.670 Kg
14%

0%
Rate per each cut

Lowering 600 mm dia DI pipe


Weight of 5m length =(1188+1296+1404)/3=1296
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

1296.000 Kg
14%

0%
Rate per each cut

Lowering 700mm dia DI pipe


Weight of 5m length =(1533+1675+1808)/3=1672
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

1672.000 Kg
14%

0%
Rate per each cut

Lowering 750 mm dia DI pipe


Weight of 5m length =(1718+1876+2029)/3=1874.33
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

1874.330 Kg
14%

0%
Rate per each cut

Lowering 800 mm dia DI pipe


Weight of 5m length =(1922+2093+2263)/3=2092.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

2092.670 Kg
14%

0%
Rate per each cut

Lowering 900 mm dia DI pipe


Weight of 5m length =(2342+2544+2766)/3=2554
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

2544.000 Kg
14%

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1197 of 3205

Lowering 1000 mm dia DI pipe


Weight of 5m length =(2814+3072+3318)/3=3068
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

3068.000 Kg
14%

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1198 of 3205

Jointing of DI pipes
Sub Analysis : (Basic Data) for Jointing of DI Pipes

OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure inc
with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class ( Labour-Irrigation-Skilled-Sn.6)
Fitters II Class ( Labour-Irrigation-semi Skilled-Sn.9)
Machinery
Hire chargers for Hydralic field test pressure testing
transportation of water @ Rs. 1200/- (1000+200) / day

3.000 day
3.000 day
including

Materials
Pressure guage
3/4" G.I. Pipe (20 mm) ( excluding labour charges)
Specials
Dummies

3.000 days

0.050 Nos
3.000 RM
1 Ls
0.100 No.
60.000 Lts.

Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22-Irri. SSR)

(T) Total Rate per 500 Mts.


(r) Rate per 1 Rmt for 450 mm dia
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r
Note : Proportionate Testing Charges may be arrived, keeping the diametre of pipe based on this analysis
various Dia Pipes.
43

PHE-JCIR-4 : Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost o
sundries filling with water, with a water lead up to 500m and testing to required pressure, etc. complete R
3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.
Details of cost for 10 Joints
Jointing 80 mm dia DI pipe
a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

80 mm dia
0.300 day
0.800 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials needed
for testing (as per Sub Analysis 2 A)

- each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1199 of 3205

Jointing 100 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

100 mm dia
0.500 day
1.000 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 125 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

125 mm dia
0.500 day
1.000 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 150 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

150 mm dia
0.600 day
1.100 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
data-DI pipes 337269598.xlsx

14%

Page 1200 of 3205

Rate per joint = h/10


VAT & Labour cess.

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1201 of 3205

Jointing 200 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

200 mm dia
0.600 day
1.100 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 250 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

250 mm dia
0.620 day
1.200 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 300 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

300 mm dia
0.800 day
1.200 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
data-DI pipes 337269598.xlsx

14%

Page 1202 of 3205

VAT & Labour cess.

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1203 of 3205

Jointing 350 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

350 mm dia
0.900 day
1.500 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 400 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

400 mm dia
1.000 day
1.500 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 450 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

450 mm dia
1.200 day
1.700 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
data-DI pipes 337269598.xlsx

14%

Page 1204 of 3205

VAT & Labour cess.

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1205 of 3205

Jointing 500 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

500 mm dia
1.300 day
1.800 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 600 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

600 mm dia
1.500 day
2.000 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 650 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

650 mm dia
1.600 day
2.100 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
data-DI pipes 337269598.xlsx

14%

Page 1206 of 3205

VAT & Labour cess.

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1207 of 3205

Jointing 700 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

700 mm dia
1.700 day
2.200 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 750 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

750 mm dia
1.700 day
2.200 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 800 mm dia DI pipe


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Foreman (work inspector) Non technical (Labour -Irrigation-Skilled -Sn.10)

800 mm dia
2.350 day
4.700 day
0.650 day

b) Material
Rubber gasket

each

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
data-DI pipes 337269598.xlsx

14%

Page 1208 of 3205

(h) Cost for 10 joints (f+g)


Rate per joint = h/10
VAT & Labour cess.

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1209 of 3205

Jointing 900 mm dia DI pipe


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Foreman (work inspector) Non technical (Labour -Irrigation-Skilled -Sn.10)

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

900 mm dia
2.750 day
5.500 day
0.700 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 1000 mm dia DI pipe


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Foreman (work inspector) Non technical (Labour -Irrigation-Skilled -Sn.10)

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

1000 mm dia
3.000 day
6.000 day
0.750 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1210 of 3205

44

PHE-JCIF-5 : Jointing CI pipes, fittings and valves with flanged ends including cost of jointing
ma
insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressu
specifications. BIS No.3114/1994.)
Details of cost for 10 joints
80 mm dia
a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

0.090 day
0.210 day
0.800 day

b) Material
Bolts and nuts 16mm dia 60mm long ( Sn.5-Table-31,Pg.82-2014-15)

6.800 kg

Rubber insertion 5mm thick (Sn-4-Table-31,Pg.82-2014-15)

2.125 kg

80 mm dia

White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials needed
for testing (as per Sub Analysis 2 A)

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

100 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

100 mm dia
0.150 day
0.350 day
1.000 day

b) Material
Bolts and nuts 16mm dia 60mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

13.600 kg
2.540 kg

27.500 rm

14%

Rate per each joint

data-DI pipes 337269598.xlsx

Page 1211 of 3205

125 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

125 mm dia
0.150 day
0.350 day
1.000 day

b) Material
Bolts and nuts 16mm dia 60mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

13.600 kg
3.140 kg

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

14%

Rate per each joint


d

150 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

150 mm dia
0.180 day
0.420 day
1.100 day

b) Material
Bolts and nuts 20mm dia 65mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

24.000 kg
4.300 kg

27.500 rm

14%

0%
Rate per each joint

200 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 20mm dia 70mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
data-DI pipes 337269598.xlsx

200 mm dia
0.180 day
0.420 day
1.100 day

25.200 kg
6.160 kg

27.500 rm

Page 1212 of 3205

(e) Add for water charges @ 1% on Labour & Testing Charges


(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

data-DI pipes 337269598.xlsx

Page 1213 of 3205

250 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

250 mm dia
0.200 day
0.420 day
1.200 day

b) Material
Bolts and nuts 20mm dia 75mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

39.600 kg
8.500 kg

27.500 rm

14%

0%
Rate per each joint

300 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

300 mm dia
0.240 day
0.560 day
1.200 day

b) Material
Bolts and nuts 20mm dia 75mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

39.600 kg
10.280 kg

27.500 rm

14%

0%
Rate per each joint

350 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 20mm dia 80mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
data-DI pipes 337269598.xlsx

350 mm dia
0.300 day
0.600 day
1.500 day

54.400 kg
21.260 kg

27.500 rm

Page 1214 of 3205

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

400 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

400 mm dia
0.300 day
0.700 day
1.500 day

b) Material
Bolts and nuts 24mm dia 85mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

98.400 kg
27.640 kg

27.500 rm

14%

0%
Rate per each joint

450 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

450 mm dia
0.360 day
0.840 day
1.700 day

b) Material
Bolts and nuts 24mm dia 85mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

123.000 kg
22.660 kg

27.500 rm

14%

0%
Rate per each joint

500 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
data-DI pipes 337269598.xlsx

500 mm dia
0.390 day
0.910 day

Page 1215 of 3205

Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

1.800 day

b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

134.000 kg
38.190 kg

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

600 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

600 mm dia
0.45 day
1.05 day
2.00 day

b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

192.00 kg
51.71 kg

27.50 rm

14%

0%
Rate per each joint

700 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
data-DI pipes 337269598.xlsx

700 mm dia
0.51 day
1.19 day
2.20 day

244.80 kg
68.91 kg

27.500 rm

Page 1216 of 3205

(g) Overheads & Contractors Profit


(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

750 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

750 mm dia
0.510 day
1.190 day
2.200 day

b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

260.400 kg
78.430 kg

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

800 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg -3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

800 mm dia
1 No
14%
0%
Rate per each joint

900 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg - 3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

900 mm dia
1 No
14%
0%
Rate per each cut

1000 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg - 3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

1000 mm dia
1 No
14%
0%
Rate per each cut

1100 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg - 3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

1100 mm dia
1 No
14%
0%
Rate per each cut

1200 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg - 3
data-DI pipes 337269598.xlsx

1200 mm dia
1 No

Page 1217 of 3205

Overheads & Contractors Profit


Rate per each joint
VAT & Labour cess.

14%
0%
Rate per each cut

45

BMW-G.01: Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer a
with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but w
for tanks
Rate as per BMW-G.01 Sn.335 of 2014-15 -B. SSR
labour charges-BMW-G.02, S.n.336-B.SSR
Total
Overheads & Contractors Profit
Total
VAT & Labour cess.

1.00 Lit

20%
14%
0%
Rate per 1 Lit

46
a

PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains where ever required (.Dia of pipes in mm.)
Details of cost for one cutting
Cutting C.I./ DI Pipe -80 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.060 day
0.060 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.
Rate per each cut
b

14%
0%

Cutting C.I./ DI Pipe -100 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.080 day
0.080 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe -125 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.110 day
0.110 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe -150 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.150 day
0.150 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1218 of 3205

Cutting C.I./ DI Pipe -200 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.200 day
0.200 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 250 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.250 day
0.250 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 300 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.300 day
0.300 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 350 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.350 day
0.350 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1219 of 3205

Cutting C.I./ DI Pipe - 400 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.400 day
0.400 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 450 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.450 day
0.450 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 500 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.500 day
0.500 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 600 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.600 day
0.600 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 700 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 750 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 800 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.
data-DI pipes 337269598.xlsx

1 No
14%
0%

Page 1220 of 3205

Rate per each cut


q

Cutting C.I./ DI Pipe - 900 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1221 of 3205

Cutting C.I./ DI Pipe - 1000 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 1100 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 1200 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

data-DI pipes 337269598.xlsx

Page 1222 of 3205

Rate

Unit

Amount

g them true to alignment and gradient including all sundries


cifications. BIS No.3114/94)

576.00
450.00
384.00

1 day
1 day
1 day

58.75
107.10
510.72
676.57
67.66
1.316

h s/s ends carefully into trenches and laying them true to


of pipes from source of supply (Ref to specifications. BIS
be as per sub-analysis made for 200 mm dia CI Pipes

1.316

1.316

1.316

1 Kg

Rs

112.52
15.32
127.84
25.57
0.00
25.57

Rs

143.01
19.47
162.48
32.50
0.00
32.50

Rs

185.99
25.32
211.31
42.26
0.00
42.26

1 Kg

1 Kg

data-DI pipes 337269598.xlsx

Page 1223 of 3205

1.316

1 Kg

Rs

232.93
31.71
264.64
52.93
0.00
52.93

data-DI pipes 337269598.xlsx

Page 1224 of 3205

1.316

1.316

1.316

1.316

1.316

1.316

1 Kg

Rs

338.65
46.11
384.76
76.95
0.00
76.95

Rs

457.53
62.29
519.82
103.96
0.00
103.96

Rs

591.77
80.57
672.34
134.47
0.00
134.47

Rs

742.22
101.05
843.27
168.65
0.00
168.65

Rs

905.84
123.33
1029.17
205.83
0.00
205.83

Rs

1095.79
149.19
1244.98
249.00
0.00
249.00

1 Kg

1 Kg

1 Kg

1 Kg

1 Kg

data-DI pipes 337269598.xlsx

Page 1225 of 3205

1.316

1.316

1.316

1.316

1.316

1.316

1 Kg

Rs

1277.40
173.92
1451.32
290.26
0.00
290.26

Rs

1705.54
232.21
1937.75
387.55
0.00
387.55

Rs

2200.35
299.58
2499.93
499.99
0.00
499.99

Rs

2466.62
335.83
2802.45
560.49
0.00
560.49

Rs

2753.95
374.95
3128.90
625.78
0.00
625.78

Rs

3347.90
455.82
3803.72
760.74
0.00
760.74

1 Kg

1 Kg

1 Kg

1 Kg

1 Kg

data-DI pipes 337269598.xlsx

Page 1226 of 3205

1.316

1 Kg

Rs

4037.49
549.7
4587.19
917.44
0.00
917.44

data-DI pipes 337269598.xlsx

Page 1227 of 3205

ydralic field test pressure including transportation of Water

504.00
450.00

1 day
1 day

1512.00
1350.00

1200.00

1 days

3600.00

500.00
151.00
500.00
1500.00
57.00

1 Nos
1 RM
1 Ls
1 Each
1 Lts.

25.00
453.00
500.00
150.00
3420.00
11010.00
22.02
0.489
pipe based on this analysis, for an varities of pipes for

n-joint), excluding the cost of the gasket but including all


d pressure, etc. complete Reference to specifications IS

450.00
384.00

3.91

1 day
1 day

135.00
307.20
442.20

1 rm

195.50

637.70
6.38

Rs

644.08
87.69
731.77
73.18
0.00
73.18

data-DI pipes 337269598.xlsx

Page 1228 of 3205

450.00
384.00

4.89

1 day
1 day

225.00
384.00
609.00

1 rm

244.50
853.50
8.54

Rs

450.00
384.00

6.11

862.04
117.37
979.41
97.94
0.00
97.94

1 day
1 day

225.00
384.00
609.00

1 rm

305.50
914.50
9.15

Rs

450.00
384.00

7.34

923.65
125.75
1049.40
104.94
0.00
104.94

1 day
1 day

270.00
422.40
692.40

1 rm

367.00
1059.40
10.59
1069.99
145.68
1215.67
data-DI pipes 337269598.xlsx

Page 1229 of 3205

Rs

121.57
0.00
121.57

data-DI pipes 337269598.xlsx

Page 1230 of 3205

450.00
384.00

9.78

1 day
1 day

270.00
422.40
692.40

1 rm

489.00
1181.40
11.81

Rs

1193.21
162.46
1355.67
135.57
0.00
135.57

450.00
384.00

1 day
1 day

279.00
460.80
739.80

12.23

1 rm

611.50
1351.30
13.51

Rs

1364.81
185.82
1550.63
155.06
0.00
155.06

450.00
384.00

1 day
1 day

360.00
460.80
820.80

14.67

1 rm

733.50
1554.30
15.54
1569.84
213.73
1783.57
178.36
data-DI pipes 337269598.xlsx

Page 1231 of 3205

Rs

0.00
178.36

data-DI pipes 337269598.xlsx

Page 1232 of 3205

450.00
384.00

1 day
1 day

405.00
576.00
981.00

17.12

1 rm

856.00
1837.00
18.37

Rs

1855.37
252.61
2107.98
210.80
0.00
210.80

450.00
384.00

1 day
1 day

450.00
576.00
1026.00

19.56

1 rm

978.00
2004.00
20.04

Rs

2024.04
275.57
2299.61
229.96
0.00
229.96

450.00
384.00

1 day
1 day

540.00
652.80
1192.80

22.01

1 rm

1100.50
2293.30
22.93
2316.23
315.35
2631.58
263.16
data-DI pipes 337269598.xlsx

Page 1233 of 3205

Rs

0.00
263.16

data-DI pipes 337269598.xlsx

Page 1234 of 3205

450.00
384.00

1 day
1 day

585.00
691.20
1276.20

24.45

1 rm

1222.50
2498.70
24.99

Rs

2523.69
343.6
2867.29
286.73
0.00
286.73

450.00
384.00

1 day
1 day

675.00
768.00
1443.00

29.34

1 rm

1467.00
2910.00
29.10

Rs

2939.10
400.16
3339.26
333.93
0.00
333.93

450.00
384.00

1 day
1 day

720.00
806.40
1526.40

31.79

1 rm

1589.50
3115.90
31.16
3147.06
428.47
3575.53
357.55
data-DI pipes 337269598.xlsx

Page 1235 of 3205

Rs

0.00
357.55

data-DI pipes 337269598.xlsx

Page 1236 of 3205

450.00
384.00

1 day
1 day

765.00
844.80
1609.80

34.23

1 rm

1711.50
3321.30
33.21

Rs

3354.51
456.72
3811.23
381.12
0.00
381.12

450.00
384.00

1 day
1 day

765.00
844.80
1609.80

36.68

1 rm

1834.00
3443.80
34.44

Rs

576.00
450.00
480.00

1 day
1 day
1 day

3478.24
473.56
3951.80
395.18
0.00
395.18

1353.60
2115.00
312.00
3780.60

39.12

1 rm

1956.00
5736.60
57.37
5793.97
788.85
data-DI pipes 337269598.xlsx

Page 1237 of 3205

Rs

6582.82
658.28
0.00
658.28

data-DI pipes 337269598.xlsx

Page 1238 of 3205

576.00
450.00
480.00

1 day
1 day
1 day

1584.00
2475.00
336.00
4395.00

44.01

1 rm

2200.50
6595.50
65.96

Rs

576.00
450.00
480.00

1 day
1 day
1 day

6661.46
906.96
7568.42
756.84
0.00
756.84

1728.00
2700.00
360.00
4788.00

48.90

1 rm

2445.00
7233.00
72.33

Rs

7305.33
994.62
8299.95
830.00
0.00
830.00

data-DI pipes 337269598.xlsx

Page 1239 of 3205

cluding cost of jointing


materials such as bolts, rubber
d testing to required pressure complete. (Reference to

576.00
450.00
384.00

1 day
1 day
1 day

51.84
94.50
307.20
453.54

123.00

1 kg

836.40

103.00

1 kg

218.88

3.91

1 rm

107.53

1616.35
5.61

Rs

1621.96
220.83
1842.79
184.28
0.00
184.28

576.00
450.00
384.00

1 day
1 day
1 day

86.40
157.50
384.00
627.90

123.00
103.00

1 kg
1 kg

1672.80
261.62

4.89

1 rm

134.48
2696.80
7.62

Rs

2704.42
368.21
3072.63
307.26
307.26

data-DI pipes 337269598.xlsx

Page 1240 of 3205

576.00
450.00
384.00

1 day
1 day
1 day

86.40
157.50
384.00
627.90

123.00
103.00

1 kg
1 kg

1672.80
323.42

6.11

1 rm

168.03
2792.15
7.96

Rs

2800.11
381.23
3181.34
318.13
318.13

576.00
450.00
384.00

1 day
1 day
1 day

103.68
189.00
422.40
715.08

123.00
103.00

1 kg
1 kg

2952.00
442.90

7.34

1 rm

201.85
4311.83
9.17

Rs

4321.00
588.3
4909.30
490.93
0.00
490.93

576.00
450.00
384.00

1 day
1 day
1 day

103.68
189.00
422.40
715.08

123.00
103.00

1 kg
1 kg

3099.60
634.48

9.78

1 rm

268.95
4718.11
data-DI pipes 337269598.xlsx

Page 1241 of 3205

9.84

Rs

4727.95
643.71
5371.66
537.17
0.00
537.17

data-DI pipes 337269598.xlsx

Page 1242 of 3205

576.00
450.00
384.00

1 day
1 day
1 day

115.20
189.00
460.80
765.00

123.00
103.00

1 kg
1 kg

4870.80
875.50

12.23

1 rm

336.33
6847.63
11.01

Rs

6858.64
933.8
7792.44
779.24
0.00
779.24

576.00
450.00
384.00

1 day
1 day
1 day

138.24
252.00
460.80
851.04

123.00
103.00

1 kg
1 kg

4870.80
1058.84

14.67

1 rm

403.43
7184.11
12.54

Rs

7196.65
979.82
8176.47
817.65
0.00
817.65

576.00
450.00
384.00

1 day
1 day
1 day

172.80
270.00
576.00
1018.80

123.00
103.00

1 kg
1 kg

6691.20
2189.78

17.12

1 rm

470.80
data-DI pipes 337269598.xlsx

Page 1243 of 3205

10370.58
14.90

Rs

10385.48
1413.98
11799.46
1179.95
0.00
1179.95

576.00
450.00
384.00

1 day
1 day
1 day

172.80
315.00
576.00
1063.80

123.00
103.00

1 kg
1 kg

12103.20
2846.92

19.56

1 rm

537.90
16551.82
16.02

Rs

16567.84
2255.71
18823.55
1882.36
0.00
1882.36

576.00
450.00
384.00

1 day
1 day
1 day

207.36
378.00
652.80
1238.16

123.00
103.00

1 kg
1 kg

15129.00
2333.98

22.01

1 rm

605.28
19306.42
18.43

Rs

576.00
450.00

1 day
1 day

19324.85
2631.08
21955.93
2195.59
0.00
2195.59

224.64
409.50
data-DI pipes 337269598.xlsx

Page 1244 of 3205

384.00

1 day

691.20
1325.34

123.00
103.00

1 kg
1 kg

16482.00
3933.57

24.45

1 rm

672.38
22413.29
19.98

Rs

22433.27
3054.29
25487.56
2548.76
0.00
2548.76

576.00
450.00
384.00

1 day
1 day
1 day

259.20
472.50
768.00
1499.70

123.00
103.00

1 kg
1 kg

23616.00
5326.13

29.34

1 rm

806.85
31248.68
23.07

Rs

31271.75
4257.65
35529.40
3552.94
0.00
3552.94

576.00
450.00
384.00

1 day
1 day
1 day

293.76
535.50
844.80
1674.06

123.00
103.00

1 kg
1 kg

30110.40
7097.73

34.23

1 rm

941.33
39823.52
26.15
39849.67
data-DI pipes 337269598.xlsx

Page 1245 of 3205

Rs

5425.53
45275.20
4527.52
0.00
4527.52

576.00
450.00
384.00

1 day
1 day
1 day

293.76
535.50
844.80
1674.06

123.00
103.00

1 kg
1 kg

32029.20
8078.29

36.68

1 rm

1008.70
42790.25
26.83

6389.00

7514.00

8653.00

9821.00

11030.00

Rs

42817.08
5829.55
48646.63
4864.66
0.00
4864.66

Rs

6389.00
869.86
7258.86
0.00
7258.86

Rs

7514.00
1023.03
8537.03
0.00
8537.03

Rs

8653.00
1178.11
9831.11
0.00
9831.11

Rs

9821.00
1337.13
11158.13
0.00
11158.13

1 No

1 No

1 No

1 No

1 No

11030.00
data-DI pipes 337269598.xlsx

Page 1246 of 3205

Rs

1501.73
12531.73
0.00
12531.73

rage tank with Double layer approved brand & manufacture


lets and over flow pipes but without fittings & base support
6.00

1 Kg

6.00

Rs

0.20
6.20
0.84
7.04
0.00
7.04

Rs

27.00
23.04
50.04
6.81
56.85
0.00
56.85

Rs

36.00
30.72
66.72
9.08
75.80
0.00
75.80

Rs

49.50
42.24
91.74
12.49
104.23
0.00
104.23

Rs

67.50
57.60
125.10
17.03
142.13
0.00
142.13

1.00

a of pipes in mm.)

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

data-DI pipes 337269598.xlsx

Page 1247 of 3205

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

1 day
1 day

Rs

90.00
76.80
166.80
22.71
189.51
0.00
189.51

Rs

112.50
96.00
208.50
28.39
236.89
0.00
236.89

Rs

135.00
115.20
250.20
34.06
284.26
0.00
284.26

Rs

157.50
134.40
291.90
39.74
331.64
0.00
331.64

1 day
1 day

1 day
1 day

1 day
1 day

data-DI pipes 337269598.xlsx

Page 1248 of 3205

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

499.00

537.00

572.00

1 day
1 day

Rs

180.00
153.60
333.60
45.42
379.02
0.00
379.02

Rs

202.50
172.80
375.30
51.1
426.40
0.00
426.40

Rs

225.00
192.00
417.00
56.77
473.77
0.00
473.77

Rs

270.00
230.40
500.40
68.13
568.53
0.00
568.53

Rs

499.00
67.94
566.94
0.00
566.94

Rs

537.00
73.11
610.11
0.00
610.11

1 day
1 day

1 day
1 day

1 day
1 day

1 No

1 No

1 No

572.00
77.88
649.88
0.00
data-DI pipes 337269598.xlsx

Page 1249 of 3205

642.00

Rs

649.88

Rs

642.00
87.41
729.41
0.00
729.41

1 No

data-DI pipes 337269598.xlsx

Page 1250 of 3205

714.00

787.00

858.00

1 No

Rs

714.00
97.21
811.21
0.00
811.21

Rs

787.00
107.15
894.15
0.00
894.15

Rs

858.00
116.82
974.82
0.00
974.82

1 No

1 No

data-DI pipes 337269598.xlsx

II
Sn.
1

a
2

a
3

DATA - SUMPS & SEPTIC TANKS

Description
Quantity
RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of soils up to 3.0
drawing and technical specifications including setting out, construction of shoring and bracing, removal of stum
and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated s
Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manua
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
3.64 Nos.
Sub total
c&d) Overheads & Contractors Profit
14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering

RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork
as per drawing and technical specifications including setting out, construction of shoring and bracing, remova
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with ex
Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc.
In ordinary soils by Mechanical means for Pipe line trenches
up to 3.00 Mts depth below GL
out put
240.0
a) Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
8.32 Nos.
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
6.00 hours
Sub total
c&d) Overheads & Contractors Profit
14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering

RBR-FNDN-1- (III) - Hard rock (require blasting) -up to 3.00Mts. below GL: Excavation in Hard ro
specifications including setting out, construction of shoring and bracing, removal of stumps and other deleter
lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per T
/ 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by mechanical means. .
Upto 3 m depth including 1.5 m depth in hard rock
up to 3.00 Mts depth below GL
a)Labour
Mate ( Labour- R&B-S.N.71)
Driller ( Labour - R&B- Sn.31)
Blaster ( Labour-Irrigation-Skilled-Sn.3)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers for drilling at 15 cum
per hour (Hire-Irri-Sn.3)

c) Materials
Gelatin 80%, (Pg 30 of Irrigation items - M - 104 )
Detonator electric, (Pg 29 of Irrigation SoR - M - 094)

out put

10.0

0.50 Nos.
0.25 Nos.
8.35 Nos.
1.00 hours
3.50 No
14.00 Nos

Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering

14%

0%

RBR-EECD-9 -ii-B : :Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, lo
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirem
sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH , by Machanical means for S
Holes etc,.
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker attachment @ 6 cum
per
hour
Tipper
5.5 cum-1 trip per hour ( R&B-Hire-Sn.6)
Credit for excavated rock found suitable for use @ 50 per cent of
excavated
quantity -M-089-Pg.29 - Irri SSR
Total
d) Overheads & Contractors Profit

0.000 day
10.400 day
6.000 hour
6.50 hour
-18.00 cum
14%

Rate per cum = a+b+c+d+e)/36


VAT & labour cess
Rate per 1 Cum excluding Dewatering
5

36.00

0%

BLD-CSTN-2-8 (16) : Collection ,Supply and filling of Sand from approved quarry to work site and stacking
premeasurements including cost and convenyance of all material and all labour charges etc. complete as pe
305.3.9 MORD & 304 MORTH
out put

Sand Filling

6.00

a) Material
Sand (C-Mat-Lead statement-S.No.1)

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & Labour cess.

14%

0%

Rate per 1 Cum

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item o
flooring bed.
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1


Coarse aggregate 40mm graded ( C-Mat- S.No-57)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)


C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

1 hour
0.10 Nos
1.39 Nos

Sub- Total

d) Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & labour cess

0%

Rate per 1 Cum

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nomina
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item o
flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)


C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Man mazdoor

1 hour
0.10 Nos
1.39 Nos

Grand Total

Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & Labour cess.


Rate per 1 Cum
8

0%

BLD-CSTN-3-10- ( 27 ) Hand mixing : Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine agg
20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, s
to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 c
the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

220.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

Coarse aggregate 20mm graded (C-Mat-Sn.48)


Fine aggregate (Sand)
Water (including for curing)
B. LABOUR:

Mason 1st class (labour-Irrigation.S.N.11)


Man mazdoor

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & Labour cess.


Rate per 1 Cum
9

0%

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cos
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sa
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying co
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum ce
FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)
M-30 GRADE OF MIX
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

20mm HBG graded metal ( C-Mat- Sn.49)


Sand (C-Mat-Lead statement-S.No.1)

Mason 1st class (labour-Irri-Skilled .S.N.11)


2nd Class Mason (labour-Irri-Semi skilled.S.N.35)

400.00 Kg
0.800 Cum
0.400 Cum
0.133 Nos.
0.267 Nos.

Mazdoor (irri-Un skilled-Sn.3)


Weigh Batcher Hire charges (Batching Plant) Sn.9
Vibrator hire charges ( Hire charges-irrigation. Sn.41)
Water (including for curing) -M-189-b. irrigation SSR
BASIC COST per 1 cum

4.600 Nos.
1.333 hour
1.333 hour
1.20 Kl

Base slab and Haunches and Toe


R.C.C. M 30 Per Cum
Centering charges ,Pg No.84 to 89
Labour charges,Pg No..84 to 89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
10

0%

BLD-CSTN-3-14-(31)-B: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cos
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sa
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying co
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum ce
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
RCC - M-30 Grade of Mix
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal ( C-Mat- Sn.49)
Sand (C-Mat-Lead statement-S.No.1)
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (irri-Un skilled-Sn.3)
Weigh Batcher Hire charges (Batching Plant) Sn.9
Vibrator hire charges ( Hire charges-irrigation. Sn.41)
Water (including for curing) -M-189-b. irrigation SSR

400.00 Kg
0.800 Cum
0.400 Cum
0.167 Nos.
0.167 Nos.
5.600 Nos.
1.333 hour
1.333 hour
1.20 Kl

BASIC COST per 1 cum


Columns up to 3.66 Mts unsupported height above GL
RCC - M-30 Grade of Mix
Material charges for Centering & Scaffolding, Pg No.84 to 89 (Steel
scaffolding)
Labour charges for Centering & Scaffolding,Pg No.84 to 89

1.00 Cum
1.00 Cum

Add Labour component @

20%

1.00 Cum

Basic Cost
Overheads & Contractors Profit

14%

VAT & labour cess


Rate per One Cum
A

RCC Walls of Height up to 3.00 Mts un supported Height

i
a

Vertical walls of plane surface


Plain walls up to 3.00m height & thickness of

0%

350 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of plain surface up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00 Cum
2.86 Sqm

Overheads & Contractors Profit

14%
Total

Rate per One Cum

Vertical walls of plane surface


b

Plain walls up to 3.00m height & thickness of

100 mm

BASIC COST per 1 cum


Centering charges for RCC vertical walls of plain surface up to 3 m
height. Pg-7 of PH SoR-2014-15
Overheads & Contractors Profit

14%
Total

Rate per One Cum

1.00 Cum
10.00 Sqm

ii

Vertical walls of circular faces

Circular walls up to 3.00m Height & Thickness of

175 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of circular faces up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00 Cum
5.71 Sqm

Overheads & Contractors Profit

14%
Total

Rate per One Cum


b

Circular walls up to 3.00m Height & Thickness of

180 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of circular faces up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00 Cum
5.56 Sqm

Overheads & Contractors Profit

14%
Total

Rate per One Cum


c

Circular walls up to 3.00m Height & Thickness of

225 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of circular faces up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00 Cum
4.44 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum

0%

Circular walls up to 3.00m Height & Thickness of

300 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of circular faces up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00 Cum
3.33 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
11

0%

BLD-CSTN-3-14-(31)-C : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cos
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sa
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying co
finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, cent
vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. fo

RCC - M-30 Grade of Mix


Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal ( C-Mat- Sn.49)
Sand (C-Mat-Lead statement-S.No.1)
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)

400.00 Kg
0.800 Cum
0.400 Cum
0.067 No
0.133 No

Mazdoor (irri-Un skilled-Sn.3)


Weigh Batcher Hire charges (Batching Plant) Sn.9
Vibrator hire charges ( Hire charges-irrigation. Sn.41)
Water (including for curing) -M-189-b. irrigation SSR
BASIC COST per 1 cum

3.077 No
0.308 hour
0.308 hour
1.200
Kl

I
A
a

RCC Slabs
RCC M 30 Slabs up to 3.66 Mts height
100 mm
1.00 Cum
10.00 Sqm
10.00 Sqm
20%

RCC M 30 Slabs up to 3.66m Height & Thickness of

Cost of M- 30 grade mix


Centering charges ,Pg No.84 to 89
Labour charges,Pg No.84 to 89
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
b

0%

150 mm
1.00 Cum
6.67 Sqmt.
6.67 Sqm
20%

RCC M 30 Slabs up to 3.66m Height & Thickness of

Cost of M- 30 grade mix


Centering charges ,Pg No.84 to 89
Labour charges,Pg No.84 to 89
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
II
a

0%

RCC Dome Slab


RCC M 30 Dome Slab up to 3.66m Height
Cost of M- 30 grade mix
Centering charges ,Pg No.84 to 89
Labour charges,Pg No.84 to 89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
b

0%

RCC M 30 Dome Slab up to 7.32m Height


Cost of M- 30 grade mix
Centering charges ,Pg No.84 to 89
Labour charges,Pg No.84 to 89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
III
A

0%

RCC Beams
RCC M 30 Beams up to 3.66m Height
Cost of M- 30 grade mix
Centering charges ,Pg No.84 to 89
Labour charges,Pg No.84 to 89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%

Total
VAT & labour cess
Rate per One Cum

0%

RCC M 30 Beams up to 7.32m Height


Cost of M- 30 grade mix
Centering charges ,Pg No.84 to 89
Labour charges,Pg No.84 to 89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
12

0%

Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charg
operational charges as directed by the Engineer in Charge..
Weight of C.I. heavy weight manhole frame and cover 90 Kg each( 2 x
90 ) = 180 Kg- rate as per CI specials vide This data book

1 Kg

Total
Overheads & Contractors Profit

0%
Total

VAT & labour cess


Cost of Man hole frame in Kg
13

0%

Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and
per aprooved drawing and as directed by the departmental officers and painting both sides with anti corrosive
primary coat including cost of all materials fabrication, welding transportation to site, all taxex and duties, fixing
(1:1.5:3) prop., and all other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 4.42 kg/Rmt =

61.05 kg

total

61.05 kg

Cost of MS channels ( Rate of steel as per ENC-(PH),memo )

61.05 kg

fabrication charges, Item-BMM-V.14-934


add Labour allowence on fabrication
Hoisting and fixng in position
Painting with synthetic enamel paint aera = 17 x 0.2

61.05 kg
20%
2.90 sqm
Rate for 4.00 Rmt

VAT & labour cess

0%

for 1.00 Rmt


Rate per 1.00 Rmt
Rate per 1.00 Kg
14

Supplying and fixing of C.I. Single/ Double Socket soil pipes ISI marked conforming to IS:1729-1979 of reputed
and fixing as per site requirements including painting black with Japan paint and fixing with in cement mortar (
clamps if necessary with required no.of Bombay nails etc., complete including earth work excavation and ref
(item65,Pg.72 of BSSR)
6" dia (152.4mm) Double Socket (BMW-C.06-Sn.91, Pg,... of the
2013-14 B.SSR Earth work excavation (1.00x0.45x0.45 =0.2025 Cum )

1 Rmt
0.2025 Cum

Rate per 15.00 Rmt


Rate per 1 Rmt
Overheads & Contractors Profit
VAT & labour cess

0%
Rate per 1 Rmt

15

Supply, delivery and fixing of 110mm dia PVC vent pipe including vent cowl, cost of material and labour charge
septic tank for 15m height above GL
Cost of 110mm dia PVC Pipe.of 3.00 Mts length B.SSR 2013-14-sani.
Item No.347,Pg-99 - BMW-G.13
Rate for 15 Rmt PVC pipe
Rate for vent cowl SSR item 434,Pg-102 - BMW-G.100
PVC Pipe clip SSR item 440 Pg-102 - BMW-G.106
Labour charges for laying, fixing and commissioning the PVC pipes
including couplers/ bends/ tees etc any diameter including fixing
necessary fittings like bends, plugs, couplers, junctions, tees, etc with
solvent jointing as per standard practice, as per item No.486 of
Pg,104-BMW-G.152
Add Labour component @
Rate for 15 Rmt PVC pipe
Rate for 1 Rmt
Overheads & Contractors Profit

1 No
15 Rmt
1 No
10 No
15 Rmt

20%

14%

VAT & labour cess

0%
Rate per 1 Rmt

16

BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-2
coarse aggregate ) using 12mm size Hard Granite Machine Crushed Graded Metal including cost and
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges
ramming in 15 cm layers, finishing top surface to the required level, curing etc., complete for finished item of wo
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
12mm Graded Metal (C-Mat- Sn.45)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

1 hour

C. LABOUR:

Mason 1st class (labour-Irri-Skilled .S.N.11)


Mazdoor (irri-Un skilled-Sn.3)
Total
Overheads & Contractors Profit

0.10 Nos
1.39 Nos
14%
Rate per cu.m.

CC (1:2:4) for 1.50m dia, 35mm thick ring of 0.30m height


Qty of Ring = 2 x pi x r x t x h
Basic Rate per Cum.
Centering Charges for Bed Blocks and Bands
Labour charges for Bed blocks-Pg-84 to 89
Add Labour component @
add steel @ 40 Kg/ Cum (6mm rods)
Total
VAT & labour cess

0.051 Cum
0.051 Cum
0.051 Cum
20%
2.04 Kg
0%

Rate per each ring


b

Supply & fixing CC (1:2:4) cover 1.60m dia with nominal


reinforcement 75mm thick and hooks for lifting
Basic Rate of CC (1:2:4) pi x r^2 x Thickness
Centering Charges for Bed Blocks and Bands
Labour charges for Bed blocks-Pg-84 to 89

0.15 Cum
0.15 Cum
0.15 Cum

Add Labour component @


add steel @ 50 Kg/ Cum

20%
7.50 Kg
Total

VAT & labour cess


Rate per each slab of 1.60m dia and 75mm thick
17

0%

BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20
coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and convey
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixin
layers, finishing to required level, curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum

A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm Graded Metal (C-Mat- Sn.49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total
Overheads & Contractors Profit
Total
VAT & labour cess

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour
0.10 Nos
1.39 Nos
14%
0%
Rate per cu.m.

Supply & fixing CC (1:2:4) cover 1.20m x 0.30 m in panels with


nominal reinforcement 100mm thick and hooks for lifting
Basic Rate of CC (1:2:4) -1.2x0.30x0.10
Centering Charges for Bed Blocks and Bands
Labour charges for Bed blocks-Pg-84 to 89
Add Labour component @
add steel @ 75 Kg/ Cum

0.036 Cum
0.036 Cum
0.036 Cum
0%
2.70 Kg
Total

Rate per each slab of 1.20m x 0.3m- 0.1m thick


b

Vertical walls of plane surface


Plain walls up to 3.00m height & thickness of
Basic rate of CC ( 1:2:4)
Centering charges for RCC vertical walls of plain surface up to 3 m
height.

200 mm
1.00 Cum
5.00 Sqm

Overheads & Contractors Profit


Total
VAT & labour cess
Rate per One Cum
c

0%

Vertical walls of plane surface


Plain walls up to 3.00m height & thickness of
Basic rate of CC ( 1:2:4)
Centering charges for RCC vertical walls of plain surface up to 3 m
height.
Overheads & Contractors Profit

250 mm
1.00 Cum
4.00 Sqm

Total
VAT & labour cess
Rate per One Cum
18

0%

Supply and delivery of 6mm thick rubber packing confirming to IS including cost and conveyance, packing, fa
including all taxes and duties but excluding VAT.
Cost as per SSR- PH Items-Pg Table.No.31-Sn.4
over heads & contractors profit
VAT & labour cess

1 Kg
0%
Rate per 1 Kg

19

Supply and delivery of MS Bolts and Nuts with double washers confirming to IS specification
farwarding, transit risk etc.complete including all taxes and duties but excluding VAT..
Cost as per SSR- PH Items-Pg Table.No.31.Sn.5
over heads & contractors profit
VAT & labour cess

including

1 Kg
0%
Rate per 1 Kg

20

BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / M
Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straighte
sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splic
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of
such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover bloc
labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materia
of work in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire- SSR (Irrigation) item No 3, Pg 11
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing and
placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled-Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Sundries on Material
(c) Overheads on (a+b)
(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
VAT & Labour cess.
Rate per One MT
Rate per One Kg
21

6.00 kg

10.00 day
10.00 day

14%
0%

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost a
site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labo
grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & labour cess
Rate per 10 Sqm

22

1.05 Ton

0.15 Cum
0.60 Nos
0.96 Nos
14%
0%

BLD-CSTN-9-5: White washing two coats with whiting of approved quality to give an even shade after thorough
all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidenta
etc., complete for finished item of work, but excluding conveyance charges of materials
Whiting / White Cement -BMS-W.68-itemGum, conjee water, or prickly pear juice including necessary fire wood

2.00 Kg
LS

Brick Layers / Painter ( labour - Irri-Skilled-Sn.11)


Mazdoor (irri-Un skilled-Sn.3)

0.21 Nos
0.32 Nos

Sundries including brushes, ladders, etc.,

1%

over heads & contractors profit


Sub-Total
VAT & labour cess
Rate per 10 Sqm
23

24

14%
0%

BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood
cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges
work. (APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.(BMT-J.31-Sn-400)

0.70 Ltr

1st Class Painter (I. Skilled Labour-Irrigation-Sn.35)


2nd Class Painter (II. Semi skilled Labour-Irri-Sn.37)
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
Total cost for 10 sqm
Rate per 10 Sqm

0.21 day.
0.49 day.

14%

BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundati
in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including
work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

6.00
0.00 Nos
0.31 Nos
14%

Rate per 1 Cum


25

Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cos
charges, all leads & lifts and other incidental and operational charges etc., complete.

Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km

1 cum
Rate per 1 Cum

Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km

1 cum
Rate per 1 Cum

26

BLD-CSTN-9-5-(103): Flooring with Glass Mosaic Tiles Group 1 series or equivalent quality 20x20x4 m
cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of
3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade,
cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item o
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Glass Mosaic Tiles Group 1 series or equivalent quality 20x20x4 mm
thick
-BMT-C.18,
Sn.55
Cement
for CM (1:8)
for base coat
Cement for slurry
Cement for Pointing with CM (1:3)
Sand for CM (1:8)

10.50
21.60
33.00
6.000
0.12

sqm
kg.
kg.
kg.
cum

Sand for pointing


B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Add water charges 1%
Grand Total
over heads & contractors profit
Total cost for 10 sqm

0.020

cum

0.96
2.24
3.30

day
day
day

1%
14%
Rate per 10 Sqm

DATA - SUMPS & SEPTIC TANKS

Rate
Unit
Amount
cavation for structures in all types of soils up to 3.00 Mts depth below GL as per
g out, construction of shoring and bracing, removal of stumps and other deleterious material
s and bottom and backfilling in trenches with excavated suitable material as per Technical
Thrust blocks, Chambers and Man Holes etc. by manual means,

as per 302.2.1(a) of MORD and 301.2.1 of MORT&H


an Holes etc,.
Cum
450.00
384.00

1 Each
1 Each

Rs

0.00
1397.76
1397.76
190.31
1588.07
158.81
0.00
158.81

Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soils
g setting out, construction of shoring and bracing, removal of stumps and other deleterious
g of sides and bottom and backfilling in trenches with excavated suitable material as per
r Sumps,Thrust blocks, Chambers and Man Holes etc. by mechanical means.

ne trenches
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
94.40
0.00
94.40

Rs

g) -up to 3.00Mts. below GL: Excavation in Hard rockas per drawing and technical
shoring and bracing, removal of stumps and other deleterious material and disposal upto a
filling in trenches with excavated suitable material as per Technical Specification 305 MORD
s and Man Holes etc. by mechanical means. .

k
Cum

576.00
576.00
384.00

1 Each
1 Each
1 Each

288.00
144.00
3206.40

1145.10

1 hours

1145.10

73.00
13.00

1 No
100 Nos

255.50
1.82

Rs

5040.82
686.31
5727.13
572.71
0.00
572.71

g prohibited) with rock breakers including breaking rock, loading in tippers and disposal with
ming bottom and side slopes in accordance with requirements of lines, grades and cross3.5 MORD / 301 MORTH , by Machanical means for Sumps, Thrust Blocks and Man
Cum
450.00
384.00

1 day
1 day

0.00
3993.60

2791.00
909.70
194.00

1 hour
1 hour
1 cum

16746.00
5913.05
-3492.00
23160.65
3153.32
26313.97
730.94
0.00
730.94

of Sand from approved quarry to work site and stacking at work site to Dept. gauge for
e of all material and all labour charges etc. complete as per standard specifications. Clause
Cum
641.93

1 Cum

3851.58

450.00
384.00

1 Nos
1 Nos

0.00
119.04
3970.62
540.6
4511.22
751.87
0.00
751.87

s up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine
Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
, seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
he required level curing etc., complete for finished item of work.for foundation and under

5.740
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
356.37
123.60

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3487.46
474.82
3962.28
0.00

Rs
Rs

3962.28

works up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine
Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
, seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
he required level curing etc., complete for finished item of work.for foundation and under

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

929.88
1340.83
356.37
123.60

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3673.44
500.14
4173.58
0.00
4173.58

Rs
Rs
Rs

ent concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using
luding cost and conveyance of all materials like cement, sand, coarse aggregate water etc.,
ur charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to
em of work.for foundation and under flooring bed.

5.74
1854.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

1262.80
1669.33
356.37
123.60

504.00
384.00

1 day
1 day

50.40
906.24
4368.74
594.8
4963.54
0.00
4963.54

Rs
Rs
Rs

M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with
etal (coarse aggregate) from approved quarry including cost and conveyance of all materials
, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
rges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
r finished item of work (APSS No. 402)with minimum cement content as per IS code . for
th)

5.74
1854.81
791.93
504.00
450.00

1 Kg
1 Cum
1 Cum
1 Each
1 Each

2296.00
1483.85
316.77
67.03
120.15

384.00
556.80
175.40
103.00

1 Each
1 hour
1 hour
1 Kl
Rs

1766.40
742.21
233.81
123.60
7149.82

7149.82
277.00
446.00

1 Cum
1 Cum
1 Cum

Rs

7149.82
277.00
446.00
89.20
7962.02
1084.03
9046.05
0.00
9046.05

M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with
etal (coarse aggregate) from approved quarry including cost and conveyance of all materials
, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
rges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but
or finished item of work (APSS No. 402)with minimum cement content as per IS code for
S IN BUILDINGS

5.74
1854.81
791.93
504.00
450.00
384.00
556.80
175.40
103.00

1 Kg
1 Cum
1 Cum
1 Each
1 Each
1 Each
1 hour
1 hour
1 Kl

2296.00
1483.85
316.77
84.17
75.15
2150.40
742.21
233.81
123.60
Rs

7505.96

7505.96
341.00

1 Cum
1 Cum

7505.96
341.00

1603.00

1 Cum

1603.00

Rs

Rs

320.60
9770.56
1330.26
11100.82
0.00
11100.82

d Height

7505.96
876.00

1 Cum
1 Sqm

7505.96
2505.36
Rs

Rs

10011.32
1363.04
11374.36
11374.36

7505.96
876.00

1 Cum
1 Sqm

7505.96
8760.00
Rs

Rs

16265.96
2214.61
18480.57
18480.57

7505.96
1115.00

1 Cum
1 Sqm

7505.96
6366.65
Rs

Rs

7505.96
1115.00

1 Cum
1 Sqm

7505.96
6199.40
Rs

Rs

7505.96
1115.00

1 Cum
1 Sqm

13705.36
1865.98
15571.34
15571.34

7505.96
4950.60
Rs

Rs

7505.96
1115.00

13872.61
1888.76
15761.37
15761.37

1 Cum
1 Sqm

12456.56
1695.96
14152.52
0.00
14152.52

7505.96
3712.95
Rs

Rs

11218.91
1527.45
12746.36
0.00
12746.36

M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with
etal (coarse aggregate) from approved quarry including cost and conveyance of all materials
, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
rges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for
m cement content as per IS code including pumping, centering, shuttering, laying concrete,
teel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

5.74
1854.81
791.93
504.00
450.00

1 Kg
1 Cum
1 Cum
1 No
1 No

2296.00
1483.85
316.77
33.77
59.85

384.00
556.80
175.40
103.00

1 No
1 hour
1 hour
1 Kl
Rs

1181.57
171.49
54.02
123.60
5720.92

5720.92
227.00
152.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5720.92
227.00
152.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

5720.92
3681.00
2471.00

1 Cum
1 Cum
1 Sqm
Rs

Rs

5720.92
6632.00
3911.00

1 Cum
1 Cum
1 Sqm
Rs

Rs

5720.92
2002.00
1344.00

1 Cum
1 Sqm
1 Sqm
Rs

5720.92
2270.00
1520.00
304.00
9814.92
1336.3
11151.22
0.00
11151.22

5720.92
1514.09
1013.84
202.77
8451.62
1150.69
9602.31
0.00
9602.31

5720.92
3681.00
2471.00
494.20
12367.12
1683.78
14050.90
0.00
14050.90

5720.92
6632.00
3911.00
782.20
17046.12
2320.83
19366.95
0.00
19366.95

5720.92
2002.00
1344.00
268.80
9335.72
1271.06

Rs

10606.78
0.00
10606.78

5720.92
3607.00
2127.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5720.92
3607.00
2127.00
425.40
11880.32
1617.51
13497.83
0.00
13497.83

ole frame and cover in the roof slab incuding labour charges for fixing and all incidental and
harge..
80.530

1 Kg

80.53

Rs

Rs

80.53
0.00
80.53
0.00
80.53

h ladders with 50X50X6 mm MS angles 2 nos verticals and horizontals fixed at 25 cm c/c as
mental officers and painting both sides with anti corrosive paint two coats over one coat of
n, welding transportation to site, all taxex and duties, fixing in position duly embodying in CC
al charges etc., complete for finished item of work.

38.00

1 kg

2319.90

22.00

1 Kg

1343.10
268.62

476.56

10 Sqm

138.20
4069.82
0.00
4069.82
Rs.
Rs.

1017.46
1017.46
66.66

il pipes ISI marked conforming to IS:1729-1979 of reputed make with cement caulked joints
black with Japan paint and fixing with in cement mortar (1:1) and including fixing of M.S.
ls etc., complete including earth work excavation and refilling etc for Out let arrangement.

1841.00

1 Rmt

1841.00

139.78

1 Cum

28.31
1869.31
1869.31
261.70
2131.01
0.00
2131.01

pipe including vent cowl, cost of material and labour charges etc., complete for fixing it to the
484.00

3 Rmt

161.33

161.33
19.00
18.00
65.00

1 Rmt
1 Each
1 Each
1 Rmt

2419.95
19.00
180.00
975.00

195.00
3788.95
252.60
34.39
286.99
0.00
286.99

o Plinth Level ; Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate:
te Machine Crushed Graded Metal including cost and conveyance of all materials like
, seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
required level, curing etc., complete for finished item of work with nomonal reinforcement

5.74
1563.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

1894.20
1407.43
356.37
123.60

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
4704.36
640.50
5344.86

Rs
Rs

5344.86
61.00
230.00
36.00

1 Cum
1 Cum
1 Cum
1 Kg
Rs
Rs

5344.86
61.00
230.00

1 Cum
1 Cum
1 Cum

272.59
3.11
11.73
2.35
73.44
363.22
0.00
363.22

801.73
9.15
34.50

36.00

6.90
270.00
1122.28
0.00
1122.28

1 Kg

Rs.

Plinth Level ; Plain Cement concrete nominal mix M-20 prop (Cement : fine aggregate:
Machine Crushed Graded Metal including cost and conveyance of all materials like cement,
age charges on all materials, labour charges , for mixing , laying, concrete , ramming in
te for finished item of work with nomonal reinforcement

5.74
1854.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

1894.20
1669.33
356.37
123.60

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
4966.26
676.16
5642.42
0.00
5642.42

Rs

Rs

5642.42
61.00
230.00
36.00

4704.36
876.00

1 Cum
1 Cum
1 Cum

Rs.

203.13
2.20
8.28
0.00
97.20
310.81
310.81

1 Cum
1 Sqm

4704.36
4380.00

1 Kg

Rs

Rs

4704.36
876.00

1 Cum
1 Sqm

9084.36
1271.81
10356.17
0.00
10356.17

4704.36
3504.00
Rs

8208.36
1149.17

Rs

9357.53
0.00
9357.53

nfirming to IS including cost and conveyance, packing, farwarding, transit risk etc.complete
103.00

1 Kg

Rs

103.00
14.42
0.00
117.42

ouble washers confirming to IS specification


s and duties but excluding VAT..

including cost and conveyance, packing,


123.00

1 Kg

85.00
11.90
0.00
Rs

96.90

Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/
eters for RCC works , including labour charges for straightening, cutting, bending to required
cks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG,
d designs and drawings, including cost and conveyance of steel bars, including all wastages
cluding cost and conveyance of binding wire, cover blocks and all incidental, operational,
osition, tying including sales and other taxes on all materials etc., complete for finished item

34000.00

1 Ton

35700.00

70.00

1 kg

420.00

588.00

1 day

5880.00

384.00

1 day

3840.00
45840.00

1 MT
Sub Total:
Rs.

6241.12
52081.12
0.00
52081.12
52.08

single coat in CM (1:3) finished smooth including cost and conveyance of all materials to
g, curing, scaffolding and all operational, incidental, labour charges etc., including cutting
shed item of work. (As per SS 903). per 10 Sqm.

3733.88

1 Cum

560.08

504.00
384.00

1 Nos
1 Nos

302.40
368.64
1231.12
167.62
1398.74
0.00
1398.74

Rs

g of approved quality to give an even shade after thoroughly brushing the surface to remove
cluding cost of all materials, labour charges and incidental such as scaffolding, lift charges
conveyance charges of materials
29.00

1 Kg

58.00
10.00

504.00
384.00

1 Nos
1 Nos

105.84
122.88

Rs

Rs

296.72
2.97
299.69
40.8
340.49
0.00
340.49

mel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including
other taxes, incidental, operational and all labour charges etc., complete for finished item of
193.00

1 Ltr

135.10

576.00
450.00

1 day.
1 day.

120.96
220.50
0.00
476.56
64.88
541.44
541.44

Rs

Rs

avated earth (excluding rock) in trenches, sides of foundations and basement with initial lead
each deposited layer by watering and ramming including cost and conveyance of water to
es, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Cum
450.00
384.00

1 Nos
1 Nos

0.00
119.04
16.21
135.25
22.54
22.54

distance suitable including loading, unloading charges, cost & conveyance, dumping, labour
rational charges etc., complete.
82.70

82.70

1 Cum
Rs

82.70
82.70

Rs

82.70
82.70

1 Cum

Tiles Group 1 series or equivalent quality 20x20x4 mm thick , set over base coat of
ady laid or RCC roof slab, including neat cement slurry of honey like consistency spread @
paste to full depth mixed with pigment of matching shade, including cost of all materials like
ng seigniorage charges, etc., complete for finished item of work, but excluding the cost of

1423.00
5.74
5.74
5.74
858.93

1 sqm
1 kg.
1 kg.
1 kg.
1 cum

14941.50
123.98
189.42
34.44
103.07

858.93

1 cum

17.18

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
18168.63
181.69
18350.32
2498.4
20848.72
20848.72

Rs

DATA - INTAKE WELL


Sn.
1

Description

Quantity

RBR-FNDN-1-(i-A-i) : Earthwork in excavation for structures as per drawing and technical specifications Clause
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 M
Ordinary Soils : for Sumps, intake wells, Thrust Blocks and Man Holes etc,.
By Manual means
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)
3.64 Nos.
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & labour cess
Rate per 1 Cum excluding Dewatering

0%

RBR-FNDN-1-(i-B-i) : Earthwork in excavation for structures as per drawing and technical specifications Clause
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 M
Machanical means
Ordinary soils-Mechcanical Means-Upto 3 m depth

14%

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity ( shovel- 0.85)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

out put

240

0 Nos.
8.32 Nos.
6 hours
14%

0%
5%

RBR-FNDN-1-(i-B-ii) : Earthwork in excavation for structures as per drawing and technical specifications Clause
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 M
Ordinary Soils-Mechcanical Means-3 m to 6 m depth

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%

out put
0 Nos.
8.32 Nos.
6 hours
14%

0%
5%

210

Rate per 1 Cum including Dewatering

RBR-FNDN-1-(i-B-iii) : Earthwork in excavation for structures as per drawing and technical specifications Clause
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 M
Ordinary Soils-Mechcanical Means-above 6 m depth

out put

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

b
5

b
6

0 Nos.
8.32 Nos.
6 hours

Sub total
c&d) Overheads & Contractors Profit
Cost for 180 cum = a+b+c+d
Rate per cum = (a+b+c+d)/180
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

14%

5%

RBR-FNDN-1 - B -III - Earthwork in excavation for structures as per drawing and technical specifications Claus
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304
Sumps, Thrust Blocks and Man Holes etc,.Hard rock (requiring blasting) - Upto 3 m depth
Hard rock (requiring blasting)-Upto 3 m depth
a)Labour
Mate ( Labour- R&B-S.N.71)
Driller (labour R&B- S.N.31)
Blaster (labour R&B- S.N.14)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers ( Hire
charges- Irrigation-S.N.3)

180

out put

10

0 Nos.
0.50 Nos.
0.25 Nos.
8.35 Nos.
1 hours

c) Materials
Gelatin 80 per cent -( M-104 -Irrigation SSR )
Electric Detonators @ 1 detonator for 2 gelatine sticks of 285 gm
each -(M-094 -Irrigation SSR)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

3.50 Kg
14 Nos.

14%

5%

RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: Excavation in Hard Rock in habi
blasting can not be done as per drawings and technical specifications including setting out, construction of shoring a
and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer inc
utility services wherever it is possible during the execution and taking all precautionary measures in the restricted are

out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)
b) Machinery

10.00
0.00 Nos
5.20 Nos

a
b
5

Air compressor 210 cfm / 250 cfm with 2 jack hammers ( Hire
charges- Irrigation-S.N.3)
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d+e)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

6.00 hour

14%

0%
5%

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal m
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyanc
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and un
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.146/Cement&Steel / T1 /
Coarse aggregate 40mm graded ( as per Lead statement. Sn.35)
Fine aggregate (Sand) ( Lead statement-S.N.2 )
Water (including for curing) -M-189- SSR- irrigation items
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

1 hour

C. LABOUR:
Mason 1st class(labour-Irrigation.S.N.11)

0.10 Nos

Mazdoor (irri-Un skilled-Sn.3)

1.39 Nos

Total
c&d) Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & labour cess etc,.

0%

Rate per 1 Cum up to 3.00m initial depth below GL

Rate for Extra Delifts


Rate per 3 to 4.00 m depth from GL
Basic Rate of CC (1:5:10)
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for
every 1 m depth or part thereof beyond the initial depth of 3
meters from ground level.( as per item no.32.(b) of the PH SSR,
Pg.No.8

1.00 Cum
1.00 Cum

Depth of CC (1:5:10) from Ground Level

Basic Cost

No. of
Delifts

Rate per 3 to 4.00 m depth from GL

3513.24

1.00

Rate per 4 to 5.00 m depth from GL

3513.24

2.00

Rate per 5 to 6.00 m depth from GL

3513.24

3.00

Rate per 6 to 7.00 m depth from GL

3513.24

4.00

Rate per 7 to 8.00 m depth from GL

3513.24

5.00

Rate per 8 to 9.00 m depth from GL

3513.24

6.00

Rate per 9 to 10.00 m depth from GL

3513.24

7.00

Rate per 10 to 11.00 m depth from GL

3513.24

8.00

Rate per 11 to 12.00 m depth from GL

3513.24

9.00

Rate per 12 to 13.00 m depth from GL

3513.24

10.00

Rate per 13 to 14.00 m depth from GL

3513.24

11.00

Rate per 14 to 15.00 m depth from GL

3513.24

12.00

Rate per 15 to 16.00 m depth from GL

3513.24

13.00

Rate per 16 to 17.00 m depth from GL

3513.24

14.00

Rate per 17 to 18.00 m depth from GL

3513.24

15.00

Rate per 18 to 19.00 m depth from GL

3513.24

16.00

Rate per 19 to 20.00 m depth from GL

3513.24

17.00

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WE
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concr
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cemen
FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)

M-30 GRADE OF MIX


Material
cement (ENC-PH.Memo.146/Cement & Steel /T1
20mm HBG graded metal (Lead statement-S.N.47)

400.00 Kg
0.800 Cum

Sand ( Lead statement-S.N.2 )

0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)

0.133 Nos.
0.267 Nos.
4.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items

1.333 hour
1.333 hour
1.20 Kl

BASIC COST per 1 cum


A

Base slab and Haunches and Toe


R.C.C. M 30 Per Cum
Centering charges ,Pg.106 to 108 of Bld. 1.A
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00
1.00
1.00
20%

Overheads & Contractors Profit

Cum
Cum
Cum

14%
Total

VAT & labour cess etc,.

0%

Rate per 1 Cum up to 3.00m initial depth from GL

Rate for Extra Delifts


Rate per 3 to 4.00 m depth below GL
Basic Rate of RCC-M30

1.00 Cum

Delifting the materials such as stones, concrete etc., for concrete


1.00 Cum
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for
every 1 m depth or part thereof beyond the initial depth of 3
meters from ground level.( as per item no.32.(b) of the PH SSR,
Pg.No.8
Depth of RCC M-30 for Base slab from Ground Level
Basic Cost No. of
Delifts

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 3 to 4.00 m depth from GL


Rate per 4 to 5.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 12 to 13.00 m depth from GL
Rate per 13 to 14.00 m depth from GL
Rate per 14 to 15.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 18 to 19.00 m depth from GL
Rate per 19 to 20.00 m depth from GL

BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WE
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concr
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum ceme
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
M-30 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement & Steel / T1
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )

7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02
7962.02

400.00 Kg
0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)

0.167 Nos.
0.167 Nos.
5.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

1.333 hour
1.333 hour

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum
i

Vertical walls of circular faces for Intake well

Circular walls up to 3.00m Height & Thickness of


M-30 GRADE OF MIX

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00

1.20 Kl

450 mm
1.00
Cum

Centering charges for RCC vertical walls of circular faces up to 3


m height.- 31-b.5-Pg.8 of PH SSR)

2.22

Overheads & Contractors Profit

14%

Sqm

Total
Rate per One Cum up to 3.00m height above G.L
i
b

Vertical walls of circular faces for Intake well with extra Delifts below Ground Level
Rate of 450 thick wall, 3m depth below GL
Basic Rate of 450mm thick RCC-M30 wall
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for
every 1 m depth or part thereof beyond the initial depth of 3
meters from ground level.( as per item no.32.(b) of the PH SSR,
Pg.No.8

1.00 Cum
1.00 Cum

Depth of RCC M-30 for Base slab from Ground Level

Basic Cost

No. of
Delifts

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 19 to 20.00 m depth from GL


Rate per 18 to 19.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 14 to 15.00 m depth from GL
Rate per 13 to 14.00 m depth from GL
Rate per 12 to 13.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 4 to 5.00 m depth from GL
Rate per 3 to 4.00 m depth from GL

ii

Vertical walls of circular faces for Intake well with extra lifts above Ground Level

Rate per up to 3 m height above GL


M-30 GRADE OF MIX
Lifting of cement concrete for RCC elevated reservoir. For every
1m height or part thereof over the initial lift of 3 m ( item 32. a. of
PH SSR - Pg.8

Height of RCC M-30 -wall from Ground Level

a
b
c
d
e
f
g
h
i
j

Rate per 3 to 4.00 m Height from GL


Rate per 4 to 5.00 m Height from GL
Rate per 5 to 6.00 m Height from GL
Rate per 6 to 7.00 m Height from GL
Rate per 7 to 8.00 m Height from GL
Rate per 8 to 9.00 m Height from GL
Rate per 9 to 10.00 m Height from GL
Rate per 10 to 11.00 m Height from GL
Rate per 11 to 12.00 m Height from GL
Rate per 12 to 13.00 m Height from GL

9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26

17.00
16.00
15.00
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

450 mm
1.00 Cum
1.00 Cum

Basic Cost No. of Lifts

9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00

k
l
m
n
o
p
q

Rate per 13 to 14.00 m Height from GL


Rate per 14 to 15.00 m Height from GL
Rate per 15 to 16.00 m Height from GL
Rate per 16 to 17.00 m Height from GL
Rate per 17 to 18.00 m Height from GL
Rate per 18 to 19.00 m Height from GL
Rate per 19 to 20.00 m Height from GL

i
a

Vertical walls of circular faces for Intake well

9981.26
9981.26
9981.26
9981.26
9981.26
9981.26
9981.26

11.00
12.00
13.00
14.00
15.00
16.00
17.00

Circular walls up to 3.00m Height & Thickness of


M-30 GRADE OF MIX
Centering charges for RCC vertical walls of circular faces up to 3
m height.- 31-b.5-Pg.8 of PH SSR)

250 mm
1.00
Cum
4.00
Sqm

Overheads & Contractors Profit


Rate per One Cum up to 3.00m height above G.L

14%

Vertical walls of circular faces for Intake well with extra Delifts below Ground Level

Rate of 250 thick wall, 3m depth below GL


Basic Rate of 250mm thick RCC-M30 wall
Delifting the materials for concrete below GL, for every 1 m depth beyond
the initial depth of 3 m fro GL.( as per item no.32.(b) of the PH SSR,
Pg.No.8

Depth of RCC M-30 for Base slab from Ground Level

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 3 to 4.00 m depth from GL


Rate per 4 to 5.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 12 to 13.00 m depth from GL
Rate per 13 to 14.00 m depth from GL
Rate per 14 to 15.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 18 to 19.00 m depth from GL
Rate per 19 to 20.00 m depth from GL

1.00 Cum
1.00 Cum

Basic Cost

11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96

No. of
Delifts

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00

ii

Vertical walls of circular faces for Intake well with extra lifts above Ground Level

Rate per up to 3 m height above GL


M-30 GRADE OF MIX
Lifting of cement concrete for RCC elevated reservoir. For every
1m height or part thereof over the initial lift of 3 m ( item 32. a. of
PH SSR - Pg.8 )

Height of RCC M-30 -wall from Ground Level

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 3 to 4.00 m Height from GL


Rate per 4 to 5.00 m Height from GL
Rate per 5 to 6.00 m Height from GL
Rate per 6 to 7.00 m Height from GL
Rate per 7 to 8.00 m Height from GL
Rate per 8 to 9.00 m Height from GL
Rate per 9 to 10.00 m Height from GL
Rate per 10 to 11.00 m Height from GL
Rate per 11 to 12.00 m Height from GL
Rate per 12 to 13.00 m Height from GL
Rate per 13 to 14.00 m Height from GL
Rate per 14 to 15.00 m Height from GL
Rate per 15 to 16.00 m Height from GL
Rate per 16 to 17.00 m Height from GL
Rate per 17 to 18.00 m Height from GL
Rate per 18 to 19.00 m Height from GL
Rate per 19 to 20.00 m Height from GL

BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WE
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concr
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrat
excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

M-30 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement & Steel /T1)

250 mm
1.00 Cum
1.00 Cum

Basic Cost No. of Lifts

11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96
11965.96

400.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)

0.800 Cum

Sand ( Lead statement-S.N.2 )

0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.067 No
0.133 No
3.077 No

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

0.308 hour
0.308 hour

Water (including for curing) -M-189- SSR- irrigation items

1.200 Kl

BASIC COST per 1 cum

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00

RCC M 30 Slabs up to 3.66 Mts height

RCC M 30 Slabs up to 3.66m Height & Thickness of

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
6.670 Sqm
6.670 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 30 Slabs up to 3.66m Height & Thickness of

200 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
5.000 Sqmt.
5.000 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
B

RCC M 30 Slabs up to 7.32Mts height

RCC M 30 Slabs up to 7.32m Height & Thickness of

0%

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
6.670 Sqm
6.670 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 30 Slabs up to 7.32m Height & Thickness of

200 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items

1.00 Cum
5.000 Sqmt.

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

5.000 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


C

RCC M 30 Slabs up to 10 Mts height (Ovserved data)

RCC M 30 Slabs up to 10.00 m Height & Thickness of

Rate per One Cum for 7.32m height


Add for extra height at 16.666% on every 0.610m height above
7.32m
Add 73% on Centering Charges i.e
Add 73% on Labour Charges i.e
VAT & labour cess etc,.
Rate per One Cum for 10.00m height

150 mm
1.00 Cum
4.393 16.67%
2728.03
1607.47
0%

200 mm

RCC M 30 Slabs up to 10.00 m Height & Thickness of

Rate per One Cum for 7.32m height


Add for extra height at 16.666% on every 0.610m height above
7.32m
Add 73% on Centering Charges i.e
Add 73% on Labour Charges i.e

1.00 Cum
4.393 16.67%
2728.03
1607.47

Rate per One Cum for 10.00m height


D

RCC M 30 Slabs up to 15.00 Mts height

RCC M 30 Slabs up to 15.00m Height & Thickness of

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No,31.a (ELSR ) up to 15m

1.000 Cum
6.670 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


b

200 mm

RCC M 30 Slabs up to 15.00m Height & Thickness of

Cost of M- 30 grade mix


Centering charges ,Pg No..,31.a (ELSR )

1.00 Cum
5.000 Sqmt.

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

DATA FOR FOOT BRIDGES


9

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WE
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concr
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cemen
FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)
M-20 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement &Steel / T1)
20mm HBG graded metal (Lead statement-S.N.47)

350.00 Kg
0.800 Cum

Sand ( Lead statement-S.N.2 )

0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.133 Nos.
0.267 Nos.
4.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items
BASIC COST per 1 cum
a

1.333 hour
1.333 hour
1.20 Kl

for Footings
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items

1.00
1.00

Cum
Cum

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

1.00
20%

Cum

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%

Rate per 1 Cum


b

Pedastals
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


VAT & labour cess etc,.
Rate per One Cum
c

14%
0%

Plinth beams
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items

1.00 Cum
1.00 Cum

Labour charges,Pg No. 106 to 108 of Bld. Items

1.00 Cum

Add Labour component @

20%
Sub - Total

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%
Total

Rate per One Cum


10

BLD-CSTN-3-14-(31)-B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WE
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concr
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum ceme
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
M-20 GRADE OF MIX
Mateial
cement(ENC-PH.Memo.No.146/Cement & Steel / T1)

350.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)

0.800 Cum

Sand ( Lead statement-S.N.2 )

0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.167 Nos.
0.167 Nos.
5.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items

1.333 hour
1.333 hour
1.20 Kl

BASIC COST per 1 cum


a

Columns up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Material charges for Centering & Scaffolding, Pg No. 106 to 108 of
Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 106 to 108 of
Bld. Items
Add Labour component @
Basic Cost
Overheads & Contractors Profit
VAT & labour cess etc,.

1.00 Cum
1.00 Cum
1.00 Cum
20%
14%
0%

Rate per One Cum


b

Columns 4.00m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e

1.00 Cum
0.557 16.67%
341.00
1603.00

VAT & labour cess etc,.

0%

Rate per One Cum for 4.00m height


c

Columns 5.00m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.366 on Centering Charges i.e
Add 0.366 on Centering Charges i.e
VAT & labour cess etc,.
Rate per One Cum for 5.00m height

1.00 Cum
2.197 16.67%
341.00
1603.00
0%

Columns 7.32m unsupported height above GL


Rate per One Cum for 3.66m height
Material charges for Centering & Scaffolding, Pg No. 106 to 108 of
Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 106 to 108 of
Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum

20%

Overheads & Contractors Profit

14%

1.00 Cum

VAT & labour cess etc,.

0%

Rate per One Cum for 7.32m height


e

Columns 10.00 m unsupported height above GL (Ob.data)


Rate per One Cum for 7.32m height
Add for extra height at 16.666% on every 0.610m height above
7.32m
Add 0.732 on Centering Charges i.e
Add 0.732 on Centering Charges i.e

1.00 Cum
4.393 16.67%
615.00
2537.00

Add Labour component @

20%

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%

Rate per One Cum for 10.00m height


f

Columns up to 15.00 m.

0.23

R.C.C. M 20 Per Cum


Centering charges ,Pg No.340 of Bld.SSR for ELSRs

0.45

1.00 Cum
13.14 Sqm
Basic Cost

Overheads & Contractors Profit

14%

VAT & labour cess etc,.


Rate per One Cum

0%

Rate for extra Heights


g

Columns from 15.00 m. to 18.00m

0.23

R.C.C. M 20 Per Cum

0.45

1.00 Cum

Centering charges ,Pg No.340 of Bld.SSR for ELSRs

13.14 sqm

Add for extra height

9.0%
Basic Cost

Overheads & Contractors Profit @ 14%

14.00%

VAT & labour cess etc,.


Rate per One Cum
h

0%

Lintels up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%
Total

Rate per One Cum

Lintels up to 7.32 Mts unsupported height above GL


M-20 GRADE OF MIX
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%
Total

Rate per One Cum


11

BLD-CSTN-3-14-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WE
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concr
excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement
standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrat
excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

M-20 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
20mm HBG graded metal (Lead statement-S.N.47)

350.00 Kg
0.800 Cum

Sand ( Lead statement-S.N.2 )

0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.067 No
0.133 No
3.077 No

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items

0.308 hour
0.308 hour
1.200 Kl

BASIC COST per 1 cum


I

RCC Slabs for Pump Room

RCC M 20 Slabs of 125mm thick

RCC M 20 Slabs up to 3.66m Height & Thickness of

125 mm

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items

1.000 Cum
8.000 Sqm

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

8.000 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum for 3.66m height


b

RCC M 20 Slabs at 4.00 Mts height & Thickness of

125 mm

Rate for 4.00m Height


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.
Rate per One Cum for 4.00m height

0.56 16.67%
227.00
152.00
0%

125 mm

RCC M 20 Slabs at 5.00 Mts height & Thickness of

Rate for 5.00m Height


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.367 on Centering Charges i.e
Add 0.367 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.

2.20 16.67%
227.00
152.00
0%

Rate per One Cum for 5.00m height


d

RCC M 20 Slabs at 6.00 Mts height


Rate for 6.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.64 on Centering Charges i.e
Add 0.64 on Centering Charges i.e
Sub - Total
Rate per One Cum for 6.00m height

125 mm

3.84 16.67%
227.00
152.00

125 mm
1.000 Cum
8.000 Sqm
8.000 Sqm
20%

RCC M 20 Slabs up to 7.32m Height & Thickness of

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

RCC Slabs for Pump Room


Rate per One Cum
B
a

0%

RCC M 20 Slabs of 175mm thick


175 mm
1.000 Cum
5.710 Sqm
5.710 Sqm
20%

RCC M 20 Slabs up to 3.66m Height & Thickness of

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

Rate per One Cum for 3.66m height


b

RCC M 20 Slabs at 4.00 Mts height & Thickness of

Rate for 4.00m Height


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.

175 mm

0.56 16.67%
233.00
157.00
0%

Rate per One Cum for 4.00m height


c

RCC M 20 Slabs at 5.00 Mts height & Thickness of

Rate for 5.00m Height


Rate per One Cum for 3.66m height

175 mm

Add for extra height at 16.666% on every 0.610m height above


3.66m
Add 0.367 on Centering Charges i.e
Add 0.367 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.
Rate per One Cum for 5.00m height

2.20 16.67%
233.00
157.00
0%

RCC M 20 Slabs at 6.00 Mts height


Rate for 5.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.64 on Centering Charges i.e
Add 0.64 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.

175 mm

3.84 16.67%
233.00
157.00
0%

Rate per One Cum for 6.00m height


e

175 mm
1.000 Cum
5.710 Sqm
5.710 Sqm
20%

RCC M 20 Slabs up to 7.32m Height & Thickness of

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs up to 7.32m Height & Thickness of

200 mm

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items

1.00 Cum
5.000 Sqmt.

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

5.000 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


D

RCC M 20 Slabs up to 15.00 Mts height

RCC M 20 Slabs up to 15.00m Height & Thickness of

300 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.7 -31.a (ELSR ) up to 15m

1.000 Cum
3.330 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


b

RCC M 20 Slabs at 18.00m Height & Thickness of


Cost of M- 20 grade mix
Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

300 mm
1.000 Cum
3.330 Sqm

Centering charges ,Pg No.7 -31.a- 15m to 18m

9%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs at 20.00m Height & Thickness of

300 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

1.000 Cum
3.330 Sqm

Centering charges ,Pg No.7- 31.a- 18m to 21m

15%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs up to 15.00 Mts height

RCC M 20 Slabs up to 15.00m Height & Thickness of

120 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.7- 31.a (ELSR ) up to 15m

1.000 Cum
8.330 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs at 18.00m Height & Thickness of

120 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

1.000 Cum
8.330 Sqm

Centering charges ,Pg No.7 - ,31.a- 15m to 18m

9%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs at 20.00m Height & Thickness of

120 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m
Centering charges ,Pg No.7 -31.a- 18m to 21m

1.000 Cum
8.330 Sqm
15%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs up to 15.00m Height & Thickness of

175 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.7- 31.a (ELSR ) up to 15m

1.000 Cum
5.710 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
II
a

0%

RCC Dome Slab


RCC M 20 Dome Slab up to 3.66m Height
Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
b

RCC M 20 Dome Slab up to 7.32m Height


Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

0%

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

III
a

RCC Beams
RCC M 20 Beams up to 3.66m Height
Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


b

RCC M 20 Beams up to 4.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e
VAT & labour cess etc,.
Rate per One Cum for 4.00m height

RCC M 20 Beams up to 5.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.367 on Centering Charges i.e
Add 0.367 on Centering Charges i.e

2.20 16.67%
2002.00
1344.00
0%

RCC M 20 Beams up to 6.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.64 on Centering Charges i.e
Add 0.64 on Centering Charges i.e
VAT & labour cess etc,.
Rate per One Cum for 6.00m height

2002.00
1344.00
0%

VAT & labour cess etc,.


Rate per One Cum for 5.00m height
d

0.56 16.67%

3.84 16.67%
2002.00
1344.00
0%

RCC M 20 Beams up to 7.32m Height


Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items

1.000 Cum
1.000 Cum

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

1.000 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
f

0%

RCC M 20- Beams up to 10.00 m Height (ob. Data)

Rate per One Cum for 7.32 m height


Add for extra height at 16.666% on every 0.610m height above
7.32m

1.000 Cum
4.39 16.67%

Add 0.732 on Centering Charges i.e


Add 0.732 on Centering Charges i.e

3607.00
2127.00
0%

Rate per One Cum

RCC M 20 Beams up to 12.50 m Height


Rate per One Cum for 7.32 m height
Add for extra height at 16.666% on every 0.610m height above
7.32m
Add 1.415 on Centering Charges i.e
Add 1.415 on Centering Charges i.e

1.000 Cum
8.49 16.67%
3607.00
2127.00
0%

Rate per One Cum


h

RCC M 20 Beams at 15m Height

0.23

Cost of M- 20 grade mix

0.45

1.00 Cum

Centering charges for Columns and Beams ,Pg No.7-31.a (7) for
ELSRs- PH SSR

13.14 sqm

Basic Cost
Overheads & Contractors Profit @ 14%

14.00%

Rate per One Cum


i

RCC M 20 Beams from 15.00 m. to 18.00m

0.23

Rate per One Cum

0.45

1.00 Cum

Centering charges for Columns and Beams ,Pg No.7-31.a (7) for
ELSRs- PH SSR

13.14 sqm

Add for extra height

9.0%
Basic Cost

Overheads & Contractors Profit @ 14%

14.00%

VAT & labour cess etc,.


Rate per One Cum

0%

IV

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed
end and 50mm th. at free end

RCC M20 for Sun shades up to 3.66m Height


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%
Total

Rate per One Sqm


b

RCC M20 for Sun shades up to 7.32m Height


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%

RCC M 20 Beams up to 12.50 m Height

0%
Total

Rate per One Sqm

12

BLD-CSTN-8-11-(86): RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal
Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage ch
all materials, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, s
charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished it
903)
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop) BMT-F.28- Sn-156Pg.No... of Bld.SSR.
Cement Mortar 1:3 for 25 mm thick (Mortars-" d ")
Dry Cement for making Lumps
12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides Excluding
HYSD Steel/ Mild steel & Binding wire
B) LABOUR CHARGES
Mason 1st class (labour-Irrigation.S.N.11)
Miller Operator (labour-Irrigation.S.N.16)
Mazdoor (irri-Un skilled-Sn.3)
c) Machinery
Machine Mixing Mortar with Miller - (Hire charges -IrrigationS.No.16)
Total
over heads & contractors profit
Grand Total for 10 Sqm
Rate per 1 sqm
VAT & labour cess etc,.

13.30 sqm
0.25 cum
50.00 kg
21.80 sqm

8.00 day
1.00 day
10.00 day
2.00 Hrs

14%

0%

Rate per 1 Sqm


13

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) using Sulphate Resistant Cementm f
and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 90
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ")
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & labour cess etc,.
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum

0.150 Cum
0.600 Nos
0.960 Nos
14%
0%
1F

2F

1398.74

1398.74

9.90

9.90

Labour Charges for Scaffolding (Pg.No.108-Bld.SSR)

58.70

83.00

Add extra over Labour component

11.74

16.60

Material Hire Charges for Scaffolding (Pg.No.108-Bld.SSR)

For Material lift Charges & Labour rate for scaffolding above 7.32
M - increase @ 50%
Total

29.35
1479.08

1537.59

14

BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seignio
including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting g
etc., complete for finished item of work of uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
Sand ( Lead statement-S.N.3 )
Top Coat in CM(1:4), 4 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
Sand ( Lead statement-S.N.3 )
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Total
C.Overheads & Contractors Profit

43.00 Kg
0.18 Cum
14.50 Kg
0.04 Cum
0.63 day
1.47 day
3.90 day
14%

VAT & labour cess etc,.


Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum

0%
1F
2995.64

2995.64

9.90

9.90

Labour Charges for Scaffolding (Pg.108 of Bld.SSR)

58.70

83.00

Add extra over Labour component

11.74

16.60

Material Hire Charges for Scaffolding (Pg.108 of Bld.SSR)

For Material lift Charges & Labour rate for scaffolding above 7.32
M - increase @ 50%
Total
15

2F

29.35
3075.98

3134.49

BLD-CSTN-8-8-(83) ; Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and conve
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges e
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ")
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & labour cess etc,.
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding (Pg.108 of Bld.SSR)
Labour Charges for Scaffolding (Pg.108 of Bld.SSR)
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32
M - increase @ 50%
Total

0.21 Cum
0.94 Nos
0.16 Nos
14%
0%
1F

2F

1498.93
9.90

1498.93
9.90

58.70
11.74

58.70
11.74
29.35

1579.27

1608.62

16

Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charges fo
operational charges as directed by the Engineer in Charge..
Weight of C.I. heavy weight manhole frame and cover 90 Kg each(
1 Kg
2 x 90 ) = 180 Kg- rate as per CI specials vide This data book
Total
Cost of Man hole frame in Kg

17

IRR-DAW-2-12: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 2
concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials,
centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,co
parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm
approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top edges of ke
rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initi
( Cement content : 300 kg / cum with use of super plasticiser(0.4% by wt. of cement, CA : 0.80 cum, Blending Ratio o

Unit
A. MATERIALS:
Cement mix
Cenent for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm ( C-Mat-Sn.47)
Coarse aggregate 10-4.75 mm ( C-Mat-Sn.58)
Fine aggregate ( screened ) ( C-Mat-Sn.3)
Super plasticiser - (Irri. SSR. Sn.70, Pg. 14)
Use rate of shuttering (rate as per Sub- data)
Scaffolding of shuttering @
Sundries
B. MACHINERY:
Concrete mixer 300 / 200 ltr ( ele
Needle vibrator 40 mm ( ele )
10 hp pump ( ele )
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
work inspector ( Labour - irrigation- Sn. 10 )
mazdoor ( Labour - Irrigation- Un skilled Sn.3)
for batching cement ( cement handling )
for batching other materials
for loading mortar pans
for laying & packing concrete
for conveying concrete
for curing & miscellaneous
Labour for shuttering ( Rate as per Sub-data)
Labour for scaffolding @
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for cum 1854.81
VAT & labour cess etc,.
Rate per 1 Rmt

36

2450 kg
35.00 kg
3.64 cum
1.96 cum
3.08 cum
9.80 kg
115.00 sqm
15%
2.00 LS

8.00 Hour
8.00 Hour
0.50 Hour

2.00 Day
1.00 Day
2.00 Day
9.00 Day
4.00 Day
2.00 Day
7.00 Day
2.00 Day
115.00 sqm
15%

14%
0%

18

RBR-SPST-8: Providing fitting and fixing mild steel railing complete as per drawing and technical specifications Cl
2703 MORTH.
Unit = Running m
Taking output = 100 m (2 x 50 m span)
(a) Material
IS MC 100=2.806x1.05=2.946 t
MS Flats = 0.964x1.05 =1.012 t
MS bars = 0.17x1.05=0.18 t
MS bolts, nuts and washers, Sn-55, Pg.13-Irri.SSR
(b) Labour
Mate
Blacksmith ( Labour-Skilled-Irrigation-Sn.2)
Mazdoor (Unskilled)
(c) Add 5 percent of (a) for painting one shop coat with red oxide
primer and three coats of synthetic enamel paint.
(d) Add for cost of concrete for fixing vertical post in the preformed
recess @ 1 per cent of (a)
(e) Add for electricity charges, welding and drilling equipment,
electrodes and other consumables @ 1 per cent of (a)

f&g) Overheads & Contractors Profit


Cost for 100 m = (a+b+c+d+e+f+g)
Rate per m = (a+b+c+d+e+f+g)/100
VAT & labour cess etc,.

100 m
2.946 t
1.01 t
0.18 t
150.00 kg
- day
30.00 day
42.80 day
5.00%

1.00%
1.00%

14%

0%

Rate per Rmt


Note : A typical drawing for MS railing has been followed for estimate purpose. Rate may be worked out as per desig
19

Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour cha
in postion etc,. Complete.
Cost of Mild Steel, structural steel, i.e. Angles,channels and "I"
sections
Transportation of material for 20.00Km lead
Labour charges for fabrication -BMM-V.16 - Sn-936
Add Municipal allowence on labour component
Labour charges for fixing - BMM-V.17 - Sn.937
Add Municipal allowence on labour component

1 Kg
1 Kg
20%
1 Kg
20%

over heads & contractors profit

14%
0%

20

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Morto
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all m
charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item o

moulded size 23x11x7 Cm - (1:6)

VAT & labour cess etc,.


Rate per 1 Kg

1 Kg

A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

48.00 Kg
512 Nos
0.20 Cum
0.24 day.
0.56 day.
1.89 day.

Ground moulded size 23

Total A+B
c.Overheads & Contractors Profit
VAT & labour cess etc,.
Grand Total
Rate per One Cum

14%
0%

Rate for other Floors

1F

Basic rate per 1Cum


Material Hire Charges for Scaffolding - Pg.108
Labour Charges for Scaffolding - Pg - 108
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32
M - increase @ 50%
Rate per One Cum
21

2F

4475.33

4475.33

43.17

43.17

255.04

361.00

51.01

72.20
21.59

4824.56

4973.29

Supply and fixing in position of Casuarina Balli Props of size - 4" to 8" dia - 20'-0" Height including fixing in requi
ground up to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
BMC-X.06 : Basic cost Sl.No 964 of Pg No.90
Add labour charges @ 20% of the balli cost
Add for Nylon ropes etc @ 5%

1 No

Rate per 1 No
22

Supply and fixing in position of Casuarina Balli Props - 3" to 4" dia - 12'-0" Height including fixing in required positio
to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
BMC-X.07 : Basic cost Sl.No 964 of Pg No.90
Add labour charges @ 20% of the balli cost
Add for Nylon ropes etc @ 5%

1 No

Rate per 1 No
23

Providind sand bags for filling in side the coffer dam


Assuming 30 bags of sand makes 1 Cum of Bund
Filling and Laying in position of Sand Bags in the stipulated places
including cost of empty cement bag, sand, thread, stiching charges
and labour charges with 14%overhead charges and contractors
profits - Irrigation SSR - under Miscellaneous Items, Sn. 2 of Pg.35

30 bags

Rate per 1 Cum


c.Overheads & Contractors Profit
VAT & labour cess etc,.
Total for 1 Cum

14%
0%

24

Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long cold twisted deformed steel Anchor ro
to the hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials,
cleaning hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.

Unit - 10 Nos

16 mm dia

A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 1.50m length
( 10x1.5x1.58) = 23.70 Kg

23.70 Kg

Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141


Pg No. 19 of R & B SoR

10 Nos

Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg


No. 19 of R & B SoR

10 Nos

B) LABOUR CHARGES
Bar Bender ( Labour-Skilled-Irri.SSR, Sn.1)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Rate per 10 Nos
Rate per 1 Nos
VAT & Labour cess

0.50 day
0.50 day
1.00 day

0%

Rate per Each

25

Supply, delivery and erecting of 3 Ton capacity chain pully block with moving trolley suitable to mount on top Girde
the pump house, including cost of material, conveyance, duties, labour charges and all other incidental charges suit
50% over load as per IS 3832 carrying ISI mark.
3 Tonne Capacity ( Rate as per Maharastra ( MJP Elec & Mech.
CSR-2012-13 - section -4, LF 1-3 )

1 No

Erection charges
3 Ton capacity Travelling Trolley ( Rate as per Maharastra ( MJP
Elec & Mech. CSR-2012-13 - section -4, LF 2-3 )

1 job

1 No

Erection charges

1 job

c.Overheads & Contractors Profit


VAT & Labour cess
Grand Total
Rate per Each
26

14%
0%

Supply delivery and installation of mannually cleaned Stainless Steel bars ( screening confriming to IS6280 as
clhanned with 0.6 m depth and angle of screen tto flows with c/c distance of 30mm for coarse screen and 20mm fo
and conveyance of all material installation, transportation all labour charges, including fabrication charges etc comple
in charge
Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes
& diameters - 202 Grade - BMT-F.05, Sn.133 of Bld.SSR

1 Kg

Labour charges for Fabrication of stainless steel railing works


using stainless steel welding rods- BMM-V.18 - Sn.938 of Bld. SSR

1 Kg

Add Municipal allowence on labour component


Labour charges for fixing Iron Doors, Iron Windows and Window
Grills in position - BMM-V.15-866

20%
1 Kg

Add Municipal allowence on labour component

20%

over heads & contractors profit

14%

VAT & Labour cess


Rate per 1 Kg

0%

L
Rate

Unit

Amount

and technical specifications Clause 305.1 including setting out,


material and disposal upto a lead of 50 m, dressing of sides and
cal Specification 305 MORD / 304 MORTH - in Ordinary soil

Cum
450.00
384.00

1 Each
1 Each

0.00
1397.76

Rs

1397.76
190.31
1588.07
158.81
0.00
158.81

and technical specifications Clause 305.1 including setting out,


material and disposal upto a lead of 50 m, dressing of sides and
cal Specification 305 MORD / 304 MORTH - in Ordinary soil - by
Cum

450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
94.4
0.00
94.40
4.72
99.12

Rs
Rs

and technical specifications Clause 305.1 including setting out,


material and disposal upto a lead of 50 m, dressing of sides and
cal Specification 305 MORD / 304 MORTH - in Ordinary soil
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
107.88
0.00
107.88
5.39

Rs

Rs

113.27

and technical specifications Clause 305.1 including setting out,


material and disposal upto a lead of 50 m, dressing of sides and
cal Specification 305 MORD / 304 MORTH - in Ordinary soil
Cum

450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
125.87
125.87
6.29
132.16

Rs
Rs

and technical specifications Clause 305.1 including setting out,


material and disposal upto a lead of 50 m, dressing of sides and
ical Specification 305 MORD / 304 MORTH - Ordinary Soils : for
m depth
Cum
450.00
576.00
576.00
384.00

1 Each
1 Each
1 Each
1 Each

0.00
288.00
144.00
3206.40

1145.10

1 hours

1145.10

73.00
13.00

1 Kg
100 Nos.

255.50
1.82

Rs
Rs

5040.82
686.31
5727.13
572.71
572.71
28.64
601.35

GL: Excavation in Hard Rock in habitant areas where conventional


setting out, construction of shoring and bracing, dressing of sides
ected by the departmental officer including protecting the existing
onary measures in the restricted areas etc, complete.

Cum
450.00
384.00

1 Nos
1 Nos

0.00
1996.80

1145.10

1 hour

6870.60

Rs

8867.40
1207.3
10074.70
1007.47
0.00
1007.47
50.37
1057.84

Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine


Metal including cost and conveyance of all materials like cement,
labour charges , for mixing , laying, concrete , ramming in 15 cm
d item of work.for foundation and under flooring bed.

5.740
1311.81

1 Kg
1 Cum

929.88
1180.63

791.93
103.00

1 Cum
1 Kl

356.37
123.60
2590.48

338.60

1 hour

338.60
338.60

504.00

1 Nos

50.40

384.00

1 Nos

533.76
584.16
3513.24
478.33
3991.57
0.00
3991.57

Rs
Rs
Rs

3513.24
41.00

Delift
charges
Rs. 41
3554.24

1 Cum
1 Cum

3513.24
41.00

OH& CP @

VAT & LC

14%

0%

Total

483.91

0.0

4038.15

3595.24

489.49

0.0

4084.73

3636.24

495.07

0.0

4131.31

3677.24

500.66

0.0

4177.90

3718.24

506.24

0.0

4224.48

3759.24

511.82

0.0

4271.06

3800.24

517.40

0.0

4317.64

3841.24

522.98

0.0

4364.22

3882.24

528.57

0.0

4410.81

3923.24

534.15

0.0

4457.39

3964.24

539.73

0.0

4503.97

4005.24

545.31

0.0

4550.55

4046.24

550.90

0.0

4597.14

4087.24

556.48

0.0

4643.72

4128.24

562.06

0.0

4690.30

4169.24

567.64

0.0

4736.88

4210.24

573.22

0.0

4783.46

corresponding to IS 456 using WEIGH BATCHER / MIXER with


m approved quarry including cost and conveyance of all materials
luding Seigniorage charges, sales & other taxes on all materials
ing, machine mixing, laying concrete, curing etc.,complete but
PSS No. 402)with minimum cement content as per IS code . for

5.74
1854.81

1 Kg
1 Cum

2296.00
1483.85

791.93

1 Cum

316.77
4096.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

67.03
120.15
1766.40
1953.58

556.80

1 hour

742.21

175.40

1 hour

103.00

1 Kl

233.81
976.02
123.60

7149.82
277.00
446.00

7962.02

Rs

7149.82

Rs

7149.82
277.00
446.00
89.20
7962.02
1084.03
9046.05
0.00
9046.05

1 Cum
1 Cum
1 Cum

1 Cum

7962.02

41.00

1 Cum

41.00

OH& CP @ VAT & LC


Delift
charges
14%
0%
Rs. 41
8003.02
1089.61
0.0
8044.02
1095.19
0.0
8085.02
1100.78
0.0
8126.02
1106.36
0.0
8167.02
1111.94
0.0
8208.02
1117.52
0.0
8249.02
1123.10
0.0
8290.02
1128.69
0.0
8331.02
1134.27
0.0
8372.02
1139.85
0.0
8413.02
1145.43
0.0
8454.02
1151.01
0.0
8495.02
1156.60
0.0
8536.02
1162.18
0.0
8577.02
1167.76
0.0
8618.02
1173.34
0.0
8659.02
1178.93
0.0

Total

9092.63
9139.21
9185.80
9232.38
9278.96
9325.54
9372.12
9418.71
9465.29
9511.87
9558.45
9605.03
9651.62
9698.20
9744.78
9791.36
9837.95

e corresponding to IS 456 using WEIGH BATCHER / MIXER with


m approved quarry including cost and conveyance of all materials
luding Seigniorage charges, sales & other taxes on all materials
ing, machine mixing, laying concrete, curing etc.,complete but
APSS No. 402)with minimum cement content as per IS code for

5.74
1854.81
791.93

1 Kg
1 Cum
1 Cum

2296.00
1483.85
316.77
4096.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

84.17
75.15
2150.40
2309.72

556.80
175.40

1 hour
1 hour

103.00

1 Kl

742.21
233.81
976.02
123.60
7505.96

Rs

7505.96

1 Cum

7505.96

1115.00

1 Sqm

2475.30
Rs

Rs

9981.26
1358.95
11340.21
11340.21

w Ground Level
9981.26
41.00

1 Cum
1 Cum

9981.26
41.00

OH& CP @ VAT & LC


Delift
charges
14%
0%
Rs. 41
10678.26
1453.85
0.0
10637.26
1448.26
0.0
10596.26
1442.68
0.0
10555.26
1437.10
0.0
10514.26
1431.52
0.0
10473.26
1425.93
0.0
10432.26
1420.35
0.0
10391.26
1414.77
0.0
10350.26
1409.19
0.0
10309.26
1403.61
0.0
10268.26
1398.02
0.0
10227.26
1392.44
0.0
10186.26
1386.86
0.0
10145.26
1381.28
0.0
10104.26
1375.69
0.0
10063.26
1370.11
0.0
10022.26
1364.53
0.0

Total

12132.11
12085.52
12038.94
11992.36
11945.78
11899.19
11852.61
11806.03
11759.45
11712.87
11666.28
11619.70
11573.12
11526.54
11479.95
11433.37
11386.79

round Level
9981.26
134.00

Lift charges

Rs. 134
10115.26
10249.26
10383.26
10517.26
10651.26
10785.26
10919.26
11053.26
11187.26
11321.26

1 Cum
1 Cum

9981.26
134.00

OH& CP @

VAT & LC

14%

0%

1377.19
1395.44
1413.68
1431.92
1450.17
1468.41
1486.66
1504.90
1523.15
1541.39

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total

11492.45
11644.70
11796.94
11949.18
12101.43
12253.67
12405.92
12558.16
12710.41
12862.65

11455.26
11589.26
11723.26
11857.26
11991.26
12125.26
12259.26

1559.63
1577.88
1596.12
1614.37
1632.61
1650.85
1669.10

7505.96
1115.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0

1 Cum
1 Sqm

13014.89
13167.14
13319.38
13471.63
13623.87
13776.11
13928.36

7505.96
4460.00
Rs
Rs

11965.96
1629.17
27190.26

w Ground Level
11965.96
41.00

1 Cum
1 Cum

Delift charges OH& CP @

Rs. 41
12006.96
12047.96
12088.96
12129.96
12170.96
12211.96
12252.96
12293.96
12334.96
12375.96
12416.96
12457.96
12498.96
12539.96
12580.96
12621.96
12662.96

14%

1634.75
1640.33
1645.91
1651.49
1657.08
1662.66
1668.24
1673.82
1679.40
1684.99
1690.57
1696.15
1701.73
1707.32
1712.90
1718.48
1724.06

11965.96
41.00

VAT & LC

Total

0%

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

13641.71
13688.29
13734.87
13781.45
13828.04
13874.62
13921.20
13967.78
14014.36
14060.95
14107.53
14154.11
14200.69
14247.28
14293.86
14340.44
14387.02

round Level
11965.96
134.00

Lift charges

Rs. 134
12099.96
12233.96
12367.96
12501.96
12635.96
12769.96
12903.96
13037.96
13171.96
13305.96
13439.96
13573.96
13707.96
13841.96
13975.96
14109.96
14243.96

1 Cum
1 Cum

11965.96
134.00

OH& CP @

VAT & LC

14%

0%

1647.41
1665.65
1683.90
1702.14
1720.39
1738.63
1756.87
1775.12
1793.36
1811.61
1829.85
1848.09
1866.34
1884.58
1902.83
1921.07
1939.32

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total

13747.37
13899.61
14051.86
14204.10
14356.35
14508.59
14660.83
14813.08
14965.32
15117.57
15269.81
15422.05
15574.30
15726.54
15878.79
16031.03
16183.28

corresponding to IS 456 using WEIGH BATCHER / MIXER with


m approved quarry including cost and conveyance of all materials
luding Seigniorage charges, sales & other taxes on all materials
ing, machine mixing, laying concrete, curing etc.,complete but
PSS No. 402)with minimum cement content as per IS code from
shuttering, laying concrete, vibrating, curing etc. complete but
CC SLABS, BEAMS

5.74

1 Kg

2296.00

1854.81

1 Cum

1483.85

791.93

1 Cum

316.77
4096.62

504.00
450.00
384.00

1 No
1 No
1 No

33.77
59.85
1181.57
1275.19

556.80
175.40

1 hour
1 hour

103.00

1 Kl

171.49
54.02
225.51
123.60
Rs

5720.92

5720.92
227.00
152.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5720.92
227.00
152.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

5720.92
409.00
241.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5720.92
1514.09
1013.84
202.77
8451.62
1150.69
9602.31
0.00
9602.31

5720.92
1135.00
760.00
152.00
7767.92
1057.6
8825.52
0.00
8825.52

5720.92
2728.03
1607.47
321.49
10377.91
1412.95
11790.86
0.00
11790.86

5720.92
409.00

1 Cum
1 Sqmt.

5720.92
2045.00

241.00

1 Sqm

1205.00
241.00
9211.92
1254.2
10466.12
0.00

Rs

Rs

10466.12

10377.91
=

73%
73%
73%

Rs

1991.46
1173.45
13542.83
0.00
13542.83

9211.92
=

73%
73%
73%
Rs

5720.92
3260.00

1 Cum
1 Sqm
Rs

Rs

5720.92
3260.00

1 Cum
1 Sqmt.
Rs

Rs

1991.46
1173.45
12376.84
12376.84

5720.92
21744.20
27465.12
3739.38
31204.50
0.00
31204.50

5720.92
16300.00
22020.92
2998.15
25019.07
0.00
25019.07

corresponding to IS 456 using WEIGH BATCHER / MIXER with


m approved quarry including cost and conveyance of all materials
luding Seigniorage charges, sales & other taxes on all materials
ing, machine mixing, laying concrete, curing etc.,complete but
PSS No. 402)with minimum cement content as per IS code . for

5.74
1854.81

1 Kg
1 Cum

2009.00
1483.85

791.93

1 Cum

316.77
3809.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

67.03
120.15
1766.40
1953.58

556.80

1 hour

742.21

175.40

1 hour

103.00

1 Kl

233.81
976.02
123.60
6862.82

Rs
6862.82
277.00

1 Cum
1 Cum

6862.82
277.00

446.00

1 Cum

446.00
89.20
7675.02
1044.95
8719.97
0.00

6862.82
315.00
710.00

Rs

8719.97

Rs

6862.82
315.00
710.00
142.00
8029.82
1093.26
9123.08
0.00
9123.08

1 Cum
1 Cum
1 Cum

6862.82
1335.00

1 Cum
1 Cum

6862.82
1335.00

1075.00

1 Cum

1075.00

215.00
9487.82
1328.29
10816.11
0
Rs

10816.11
10816.11

corresponding to IS 456 using WEIGH BATCHER / MIXER with


m approved quarry including cost and conveyance of all materials
luding Seigniorage charges, sales & other taxes on all materials
ing, machine mixing, laying concrete, curing etc.,complete but
APSS No. 402)with minimum cement content as per IS code for

5.74

1 Kg

2009.00

1854.81

1 Cum

1483.85

791.93

1 Cum

316.77
3809.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

84.17
75.15
2150.40
2309.72

556.80

1 hour

742.21

175.40

1 hour

103.00

1 Kl

233.81
976.02
123.60
Rs

7218.96

7218.96
341.00

1 Cum
1 Cum

7218.96
341.00

1603.00

1 Cum

1603.00

Rs

320.60
9483.56
1291.19
10774.75
0.00

Rs

10774.75

10774.75
=
9.30%
9.30%

9.30%
31.71
149.08
10955.54

0.00
Rs

10955.54

10774.75
=

36.6%

36.60%
36.60%

Rs

124.81
586.70
11486.25
0.00
11486.25

7218.96
615.00

1 Cum
1 Cum

7218.96
615.00

2537.00

1 Cum

2537.00
507.40
10878.36
1481.09
12359.45
0.00
Rs

10878.36
=

1 Cum
73.2%

10878.36

73.20%
73.20%

450.18
1857.08
13185.62
2637.12
15822.75
2154.27
17977.02
0.00
Rs

m size
7218.96
1099.00

17977.02

9.66 Sqm

1.36

1 Cum
1 Sqm

7218.96
14438.22
21657.18
2948.63
24605.81
0.00
24605.81

Rs

Rs

m size

12359.45

9.66 Sqm

1.36m

7218.96

1 Cum

7218.96

1099.00

1 Cum

14438.22
1299.44
Rs

22956.62
3213.93
26170.55

Rs

7218.96
1133.00
1141.00

1 Cum
1 Cum
1 Cum
Rs

0.00
26170.55

7218.96
1133.00
1141.00
228.20
9721.16
1360.96
11082.12

0.00
Rs

11082.12
11082.12

7218.96
2042.00
1806.00

1 Cum
1 Cum
1 Cum
Rs

Rs

7218.96
2042.00
1806.00
361.20
11428.16
1599.94
13028.10
0.00
13028.10
13028.10

corresponding to IS 456 using WEIGH BATCHER / MIXER with


m approved quarry including cost and conveyance of all materials
luding Seigniorage charges, sales & other taxes on all materials
ing, machine mixing, laying concrete, curing etc.,complete but
PSS No. 402)with minimum cement content as per IS code from
shuttering, laying concrete, vibrating, curing etc. complete but
CC SLABS, BEAMS

5.74
1854.81

1 Kg
1 Cum

2009.00
1483.85

791.93

1 Cum

316.77
3809.62

504.00
450.00
384.00

1 No
1 No
1 No

33.77
59.85
1181.57
1275.19

556.80

1 hour

171.49

175.40

1 hour

103.00

1 Kl

54.02
225.51
123.60
Rs

5433.92

5433.92
227.00

1 Cum
1 Sqm

5433.92
1816.00

152.00

1 Sqm

1216.00
243.20
8709.12
1185.75
9894.87
0.00

Rs

Rs

9894.87

9894.87
=

9.3%
9.3%
9.3%

Rs

21.11
14.14
9930.12
0.00
9930.12

9894.87
=

36.7%

36.7%
36.7%

83.31
55.78
10033.96
0.00
Rs

10033.96

9894.87
=

64.0%

64.0%
64.0%
Rs
5433.92
409.00
241.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5433.92
233.00
157.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

145.28
97.28
10137.43
10137.43
5433.92
3272.00
1928.00
385.60
11019.52
1500.31
12519.83
0.00
12519.83

5433.92
1330.43
896.47
179.29
7840.11
1067.43
8907.54
8907.54

8907.54
=

9.30%
9.3%
9.3%

21.67
14.60
8943.81
0.00
Rs

8943.81

8907.54

36.7%

36.7%
36.7%

85.51
57.62
9050.67
0.00
Rs

9050.67

8907.54
=

64%

64.0%
64.0%

5433.92
440.00
259.00

149.12
100.48
9157.14
0.00
Rs

9157.14

Rs

5433.92
2512.40
1478.89
295.78
9720.99
1323.51
11044.50
0.00
11044.50

1 Cum
1 Sqm
1 Sqm

Rs

5433.92
440.00

1 Cum
1 Sqmt.

5433.92
2200.00

259.00

1 Sqm

1295.00
259.00
9187.92
1250.94
10438.86
0.00

Rs

Rs

5433.92
3260.00

1 Cum
1 Sqm
Rs

Rs

5433.92
3260.00

1 Cum
1 Sqm

Rs

1 Cum
1 Sqm

5433.92
10855.80
16289.72
2217.85
18507.57
0.00
18507.57

5433.92
10855.80

Rs

5433.92
3260.00

10438.86

977.02
17266.74
2350.87
19617.61
0.00
19617.61

5433.92
10855.80

Rs

Rs

1628.37
17918.09
2439.55
20357.64
0.00
20357.64

5433.92
3260.00

1 Cum
1 Sqm
Rs

Rs

5433.92
3260.00

1 Cum
1 Sqm

5433.92
27155.80
Rs

Rs

5433.92
3260.00

1 Cum
1 Sqm
Rs

Rs

5433.92
3260.00

1 Cum
1 Sqm
Rs

Rs

5433.92
3681.00
2471.00

1 Cum
1 Cum
1 Sqm

2444.02
35033.74
4769.84
39803.58
0.00
39803.58

5433.92
27155.80
4073.37
36663.09
4991.68
41654.77
0.00
41654.77

5433.92
18614.60
24048.52
3274.21
27322.73
0.00
27322.73

Rs

5433.92
3681.00
2471.00
494.20
12080.12
1644.71
13724.83
0.00
13724.83

Rs

5433.92
6632.00
3911.00
782.20
16759.12

Rs

5433.92
6632.00
3911.00

5433.92
27155.80
32589.72
4437.09
37026.81
0.00
37026.81

1 Cum
1 Cum
1 Sqm

2281.75
19040.87
0.00
Rs

19040.87

5433.92
2002.00
1344.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5433.92
2002.00
1344.00
268.80
9048.72
1231.98
10280.70
0.00
10280.70

10280.70
=

9.3%
9.3%
9.3%

Rs

186.19
124.99
10591.88
0.00
10591.88

10280.70
=

36.7%

36.7%
36.7%

Rs

734.73
493.25
11508.68
0.00
11508.68

10280.70
=

64.0%

64.0%
64.0%

Rs

1281.28
860.16
12422.14
0.00
12422.14

5433.92
3607.00

1 Cum
1 Sqm

5433.92
3607.00

2127.00

1 Sqm

2127.00
425.40
11593.32
1578.43
13171.75
0.00
13171.75

Rs

Rs

13171.75
=

1 Cum
73.2%

13171.75

73.2%
73.2%

Rs

2640.32
1556.96
17369.04
0.00
17369.04

13171.75
=

1 Cum
141.5%

13171.75

141.5%
141.5%

Rs
m size

5103.91
3009.71
21285.36
0.00
21285.36

9.66 Sqm

1.36m

13171.75

1 Cum

13171.75

1099.00

1 Cum

14438.22
Rs

27609.97
3865.40
31475.37

Rs
m size

31475.37

9.66 Sqm

1.36m

13171.75

1 Cum

13171.75

1099.00

1 Cum

14438.22
1299.44
Rs

Rs

5433.92
224.00
175.00

1 Cum
1 Sqm
1 Sqm
Rs
Rs

Rs

5433.92
403.00
278.00

1 Cum
1 Sqm
1 Sqm
Rs
Rs

Rs

28909.41
4047.32
32956.73
0.00
32956.73

339.62
224.00
175.00
35.00
773.62
105.33
878.95
0.00
878.95
878.95

339.62
403.00
278.00
55.60
1076.22
146.53
1222.75
0.00
1222.75
1222.75

with rabbit wire mesh & nominal reinforcement as directed by


f all materials to site, seigniorage charges, sales & other taxes on
esh, water to work site, centering, scaffolding and form work, lift
s fabrication charges, for finished item of work. (APSS No.403 &

17.00

1 sqm

226.10

3733.88

1 cum

933.47

5.74
1231.12

1 kg
10 sqm

287.00
2683.84

504.00
504.00
384.00

1 day
1 day
1 day

4032.00
504.00
3840.00

338.60

1 Hrs

677.20
Rs

Rs
Rs

13183.61
1794.95
14978.56
1497.86
0.00
1497.86

ing Sulphate Resistant Cementm finished smooth including cost


inishing, curing, scaffolding and all operational, incidental, labour
nished item of work. (As per SS 903). per 10 Sqm.

3733.88

1 Cum

560.08

504.00
384.00

1 Nos
1 Nos

302.40
368.64
1231.12
167.62
1398.74
0.00
1398.74

Rs
3F

4F

5F

1398.74

1398.74

1398.74

9.90

9.90

9.90

107.40

131.80

156.10

21.48

26.36

31.22

58.70

88.05

117.40

1596.22

1654.85

1713.36

thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with
t, Sand , Water, etc., to site, seigniorage charges, all operational,
harges, curing , including cutting grooves where ever necessary
ls)

5.74
858.93

1 Kg
1 Cum

246.82
154.61

5.74
858.93

1 Kg
1 Cum

83.23
34.36

504.00
450.00
384.00

1 day
1 day
1 day

Rs
3F

4F

2995.64

2995.64

2995.64

9.90

9.90

9.90

107.40

131.80

156.10

21.48

26.36

31.22

58.70

88.05

117.40

3193.12

3251.75

3310.26

317.52
661.50
1497.60
2995.64
0.00
2995.64
0.00
2995.64

5F

hed smooth including cost and conveyance of all materials to site,


ational, incidental, labour charges etc., including cutting grooves
per 10 Sqm.

3733.88

1 Cum

504.00
384.00

1 Nos
1 Nos

784.11

Rs
3F

4F

5F

1498.93
9.90

1498.93
9.90

1498.93
9.90

58.70
11.74
58.70

58.70
11.74
88.05

58.70
11.74
117.40

1637.97

1667.32

1696.67

473.76
61.44
1319.31
179.62
1498.93
0.00
1498.93

roof slab incuding labour charges for fixing and all incidental and
80.530

1 Kg

80.53

Rs
Rs

80.53
80.53

mpressive strength not less than 20 N / sq mm ) grade cement


es including cost of all materials, machinery, labour, formwork,
vibrating, finishing, curing etc.,complete for RCC ornamental
approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height
osts and pillars with top edges of kerb and coping chamferred or
forcement steel and gate ) with initial lead upto 1 km and all lifts.
ent, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Rmt
5.74
5.74
1854.81
1519.81
858.93
86.00
218.86

1 kg
1 kg
1 cum
1 cum
1 cum
1 kg
1 sqm

14063.00
200.90
6751.51
2978.83
2645.50
842.80
25168.90
3775.34
30.00
56456.78

556.80
175.40
166.80

1 Hour
1 Hour
1 Hour

4454.40
1403.20
83.40
5941.00

504.00
480.00

1 Day
1 Day

1008.00
480.00

384.00
384.00
384.00
384.00
384.00
384.00
94.14

1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
1 sqm

768.00
3456.00
1536.00
768.00
2688.00
768.00
10826.10
1623.92
23922.02
86319.80
11752.44
98072.24
0.00
98072.24
2724.23

wing and technical specifications Clause 1208.2 MORD / 1900 &

38000
38000
38000
90.00

1t
1t
1t
1 kg

111948.00
38380.00
6840.00
13500.00

504.00
384.00
170668

1 day
1 day

15120.00
16435.20
8533.40

170668

1706.68

170668

1706.68

Rs
Rate may be worked out as per design to be followed

214169.96
29159.24
243329.20
2433.29
0.00
2433.29

veyance of all material , labour charges for fabrication and fixing


38.00

1 Kg

38.00

379.70
20.00

1000 Kg
1 Kg

18.00

1 Kg

0.38
20.00
4.00
18.00
3.60
83.98
11.43
95.41
0.00
95.41

Rs

size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost &


st of Seigniorage charges on all materials, including all labour
es etc., complete for finished item of work

5.74
4700.00
791.93
504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum
1 day.
1 day.
1 day.

275.52
2406.40
158.39
120.96
252.00
725.76

Rs

Rs

3939.03
536.3
4475.33
0.00
4475.33
4475.33

3F

4F

5F

4475.33

4475.33

4475.33

43.17

43.17

43.17

466.91

572.87

678.78

93.38

114.57

135.76

43.17

64.76

86.35

5121.97

5270.71

5419.39

0'-0" Height including fixing in required position, driving in to the


, complete
73.00

1 No

73.00
15.00
4.00
92.00

ht including fixing in required position, driving in to the ground up

121.00

25.60

1 No

121.00
24.00
6.00
151.00

1 Each

768.00

768.00
104.56
0.00
872.56

d twisted deformed steel Anchor rods with 0.75m length driven in


onry including cost of all materials, machinary, labour, drilling and
h intial lead up to 50m and all lifts.

38.00

1 Kg

900.60

154.00

1 Nos

1540.00

97.00

1 Nos

970.00

588.00
450.00
384.00

1 day
1 day
1 day

294.00
225.00
384.00
4313.60
431.36
0.00

Rs
Rs

Rs

431.36

olley suitable to mount on top Girders to handle pump & motor in


and all other incidental charges suitable for required lift, tested to

21841.00

1 No

21841.00

291.00
16863.00

1 job

1 No

291.00
16863.00

194.00

1 job

Rs

194.00
39189.00
5336.000
44525.00
0.00
44525.00
44525.00

screening confriming to IS6280 as per drawing) to fit in 45cms


mm for coarse screen and 20mm for fine screen . includiong cost
uding fabrication charges etc complete and directed by Engineer 200.00

1 Kg

200.00

111.00

1 Kg

111.00

4.00

1 Kg

22.20
4.00
0.80
338.00
47.32
385.32
0.00
385.32

Page 1361 of 3205


UNIT RATES OF WORKS
NORTH,SOUTH AND CENTRAL ZONES
Ist QUARTER 2008-2009 (July)
Data
Sl.No

Name of Work

Unit

C C ROAD WORKS
1

Earth work excavation in Loamy & Clayey Soils( Manual)

1 Cum

Earth work excavation up to SDR by machine

1 Cum

Carting of surplus earth


a 0.50 Km Lead

1 Cum

b 1.00 Km Lead
c 2.00 Km Lead
4
Supply, delivery and lowering of 150mm dia, RCC NP2 Class S/S pipes

1 Cum
1 Cum
1 Rmt

Construction of Gravel Shoulders including cost and conveyance etc.

1 Cum

Plain Cement concrete 1:5:10 prop for lean mix using 40mm m/c metal

1 Cum

Supply of bituminous contraction joint compound @4.5m c/c ( Grade 'A' ISI)

1 Rmt

Laying VCC in M20 grade Design Mix 150mm thick CC road slab using OPC cement @ 320
Kg/Cum
Supply of 25mm thick at every 50mt c/c expansion joint filler for 150mm thick slab

1 Sqm

1 Rmt

Rain Water Harwesting Structure


10

Excavation in all soils up to SDR & Stone matrix with machinery for trenches

1 Cum

11

Earth work excavation in Loamy & Clayey Soils( Manual) for trenches

1 Cum

12

Filling and packing Rough / soling stone

1 Cum

13

Mixing, spreading of a mix of (gravel and sand)

1 Cum

14
15

Refilling the trenches with usefull excavated soils other than sand
RCC M 20 Precast Slabs of 100mm thick using 320 Kg cement

1 Cum
1 Sqm

16

Providing high yield strength deformed (HYSD) steel bars

1 Kg

Foot Paths
17

Earth work excavation in Loamy & Clayey Soils( Manual) for levelling

1 Cum

18

Collection ,Supply and filling of Quarry Rubbish

1 Cum

19

Laying VCC 1:2:4 mix using 20mm to 10 mm SS-5 HBG m/c graded metal for CC walls

1 Cum

20

Laying VCC (1:5:10) using 40 mm (SS-5) HBG m/c metal

1 Cum

21

Plastering with 12mm thick in single coat in CM (1:4)

10 Sqm

22

Supplying and laying Chequred tiles of 22mm thick tiles of 0.254m x 0.406 m size

10 Sqm

Data - Rates - North,South and Central Zones - GHMC

Page 1362 of 3205


Data
Sl.No

Name of Work

Unit

SEWERAGE SYSTEM
23

Excavation in all soils up to SDR & Stone matrix with machinery for trenches

1 Cum

24

Earthwork excavation in hard rock and boulders more than 3 Cum in size requiring blasting
by machinary for trenches
Earth work excavation in in Loamy & Clayey Soils manually for trenches

1 Cum

1 Cum

27

Earthwork excavation in hard rock and boulders by benching, chiselling,manually for


trenches
Collection ,Supply and filling of Quarry Rubbish

28

Collection and Supply of good gravel

1 Cum

25
26

29
30

Refilling the trenches with usefull excavated soils other than sand
Carting of surplus earth
a 0.50 Km Lead
b 1.00 Km Lead
31 Supplying, laying, jointing and testing 152.4 mm SWG pipes including EWE for buildings
32
33

34
35
36
37
40

Constructing 904.0 mm (30) dia brick masonry inspection chamber for buildings

1 Cum

1 Cum
1 Cum
1 Cum
1 Cum
1 Rmt
1 No

Supply and delivery of Salt Glazed Pipes of ISI make


a Cost of 152.40 mm dia SWG Pipes
b Cost of 203.20 mm dia SWG Pipes
c Cost of 254.00 mm dia SWG Pipes
d Cost of 300 mm dia SWG Pipes
Lowering of 152.40 mm dia SWG pipe
Lowering of 203.20 mm dia SWG pipe
Lowering of 254.00 mm dia SWG pipe
Lowering of 300 mm dia SWG pipe
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

a M.D. -10 with 500mm dia clear opening


b H.D.-20 with 500mm dia clear opening
c H.D.-20 with 560mm dia clear opening
d H.D.-35 with 560mm dia clear opening.

1 No
1 No
1 No
1 No

Man Holes
41

1 Cum
1 Cum
1 Cum
10 Sqm
10 Sqm
1 Cum

48

Earth work excavation in in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary
Gravelly Soils for Manholes
Plain Cement concrete 1:4:8 prop
Brick Masonry with CM (1:4) prop: Cement Bricks
Carbelling the Brick Masonry with CM (1:3) prop: Cement Bricks
Plastering 12mm thick in single coat in CM (1:3)
Plastering 20mm thick in single coat in C.M. (1:3)
Cement Concrete 1:2:4 prop using 20mm to 6mm (SS 5) Hard Granite Machine Crushed
metal
Manufacture,supply and delivery of encapsulated plastic steps for man holes

49

Supply & Delivery of manhole covers and frames H.D.-20 with 560mm dia clear opening

1 No

50

Cost of man hole up to 0.90 Mts and up to 1.65 Mts

1 No

42
43
44
45
46
47

Data - Rates - North,South and Central Zones - GHMC

1 Cum

1 No

Page 1363 of 3205


Data
Sl.No
a
51
a
52
a
53
a

Name of Work
every additional 0.10mts.depth above 0.90 mts up to 1.65 Mts
Above 1.65 Mts up to 2.30 Mts
for every extra 0.10 Mts lift above 1.65 mts up to 2.30 Mts
Above 2.30 Mts depth up to 3.50 Mts
for every extra 0.10 Mts lift above 2.30 mts up to 3.50 Mts
Above 3.50 Mts depth up to 5.00 Mts
for every extra 0.10 Mts lift above 2.30 mts up to 3.50 Mts

Unit
1 No
1 No
1 No
1 No
1 No
1 No
1 No

WATER SUPPLY
54

Excavation in all soils up to SDR & Stone matrix with machinery for trenches

1 Cum

55

Earthwork excavation in hard rock and boulders more than 3 Cum in size requiring blasting
by machinary for trenches
Earth work excavation in in Loamy & Clayey Soils manually for trenches

1 Cum

1 Cum

58

Earthwork excavation in hard rock and boulders by benching, chiselling,manually for


trenches
Bailing out water from the pipe line trenches with oil engine driven pumpsets,

59
60
61
62
63
64

Collection, Supply and filling of Sand in pipeline trenches


Collection, Supply and filling of good gravel in pipeline trenches
Reffling the pipe line trenches with excavated useful soils
Supply and delivery of 6mm thick rubber packing
Supply and delivery of MS Bolts and Nuts with double washers
Vibrated Cement Concrete 1:2:4 prop using 20mm to 6mm metal for pedastals

1 Cum
1 Cum
1 Cum
1 Kg
1 Kg
1 Cum

65

Providing water supply house service connectionsof 40/25 mm Nominal Bore GI pipe

56
57

a 11/2" dia water supply connections (38mm)


b 1" dia water supply connections (25mm
66 Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with
Double layer
Cutting C.I./ DI Pipes without water in mains.Dia of pipes in mm.
a 100 mm dia
b 150 mm dia
c 200 mm dia
d 250 mm dia
e 300 mm dia
68 Centrifugally cast (spun) Ductile Iron pressure pipes with socket spigot ends

1 Cum

hp/hr

1 Rmt
1 Rmt
1 Lit

67

K9 Pipes
a 100mm dia
b 150mm dia
c 200mm dia
d 250mm dia
e 300mm dia
f 350mm dia

1 No
1 No
1 No
1 No
1 No

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

Data - Rates - North,South and Central Zones - GHMC

Page 1364 of 3205


Data
Sl.No

Name of Work

K7 Pipes
a 100mm dia
b 150mm dia
c 200mm dia
d 250mm dia
e 300mm dia
f 350mm dia
69 Manufacture with S.B.R. quality rubber gaskets suitable for C.I/ D.I. S/S pipes

Unit

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

a 100mm dia
b 150mm dia
c 200mm dia
d 250mm dia
e 300mm dia
f 350mm dia
70 Lowering the C.I. Pipes, D.I. Pipes and fittings with S/S ends

1 No
1 No
1 No
1 No
1 No
1 No

a 100mm dia
b 150mm dia
c 200mm dia
d 250mm dia
e 300mm dia
f 350mm dia
71 Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket,

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

a 100mm dia
b 150mm dia
c 200mm dia
d 250mm dia
e 300mm dia
f 350mm dia

1 No
1 No
1 No
1 No
1 No
1 No

Sluice Valves
72

Manufacture, Supply and delivery of CI D/F sluice valves PN-1.0 With handwheel

a 100mm dia
b 150mm dia
c 200mm dia
d 250mm dia
e 300mm dia
73 Labour charges for lowering and keeping in position of C.I. Sluice valves,
a 100mm dia
b 150mm dia
c 200mm dia
d 250mm dia
e 300mm dia

1 No
1 No
1 No
1 No
1 No

1 No
1 No
1 No
1 No
1 No

Data - Rates - North,South and Central Zones - GHMC

Page 1365 of 3205


Data
Sl.No
74

75

76

77
I

Name of Work

Unit

Jointing the C.I. Pipes, fittings and valves with flanged ends
a 100mm dia

1 No

b 150mm dia

1 No

c 200mm dia

1 No

d 250mm dia

1 No

e 300mm dia

1 No

CI D/F Kinetic Double Air Valve Heavy Duty suitable for working pressure upto 16kg/Cm2
without isolating valve
40 mm dia
50 mm dia
80 mm dia
100 mm dia
Labour charges for fixing Kinetic Air Valves
40 mm dia
50 mm dia
80 mm dia
100 mm dia
Manufacture, supply and delivery of centrifugally cast (spun ) ductile iron fittings

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

DI All socket Tees


a 100x100

1 No

b 150x100

1 No

c 150x150

1 No

d 200x100

1 No

e 200x150

1 No

f 200x200

1 No

g 250x100

1 No

h 250x150

1 No

i 250x200

1 No

j 250x250

1 No

k 300x100

1 No

l 300x150

1 No

m 300x200

1 No

n 300x250

1 No

o 300x300

1 No

Data - Rates - North,South and Central Zones - GHMC

Page 1366 of 3205


Data
Sl.No
II

Name of Work

Unit

DI double Socket Reducer


a 150 x 100

1 No

b 200 x 100

1 No

c 200 x 150

1 No

d 250x100

1 No

e 250 x 150

1 No

f 250 x 200
g 300x100

1 No

h 300 x 150

1 No

i 300x 200
j 300 x 250
V

VI

1 No

DI double Socket Bends

900

a 100mm dia

1 No

b 150mm dia

1 No

c 200mm dia

1 No

d 250mm dia

1 No

e 300mm dia

1 No

DI double Socket Bends

450

a 100mm dia

1 No

b 150mm dia

1 No

c 200mm dia

1 No

d 250mm dia

1 No

e 300mm dia
VII

1 No

DI double Socket Bends

22

1/2

a 100mm dia

1 No

b 150mm dia

1 No

c 200mm dia

1 No

d 250mm dia

1 No

e 300mm dia
VIII

1 No

DI double Socket Bends

11

1/4

a 100mm dia

1 No

b 150mm dia

1 No

c 200mm dia

1 No

d 250mm dia

1 No

e 300mm dia

1 No

Data - Rates - North,South and Central Zones - GHMC

Page 1367 of 3205


Data
Sl.No

Name of Work

Unit

ELSR
78

Construction of ELSR of suitable design in a single compartment

10

1 Lit

15

1 Lit

20

1 Lit

40

1 Lit

60

1 Lit

100

1 Lit

150

1 Lit

200

1 Lit

250

1 Lit

300

1 Lit

350

1 Lit

400

1 Lit

450

1 Lit

500

1 Lit

600

1 Lit

700

1 Lit

800

1 Lit

900

1 Lit

1000

1 Lit

1200

1 Lit

1500

1 Lit

2000

1 Lit

Data - Rates - North,South and Central Zones - GHMC

Page 1368 of 3205


Data
Sl.No

Name of Work

Unit

Sump
80

Earth work excavation in in Loamy & Clayey Soils

1 Cum

81

Plain Cement concrete 1:3:6 prop using 40mm M/c metal

1 Cum

82

RCC M30 grade concrete using 20mm size to 6 mmsize hard granite machine crushed
metal
a Base slab , Haunches and Toe

1 Cum

b Ring beams of size 0.25 x 0.30 mts

1 Cum

c Ring beams of size 0.25 x 0.25 mts

1 Cum

d Circular wall of Sump 160 mm Thick

1 Cum

e Circular wall of Sump 170 mm Thick

1 Cum

f Circular wall of Sump 180 mm Thick

1 Cum

g Circular wall of Sump 190 mm Thick

1 Cum

h Circular wall of Sump 200 mm Thick

1 Cum

i Circular wall of Sump 210 mm Thick

1 Cum

j Circular wall of Sump 220 mm Thick

1 Cum

k Circular wall of Sump 230 mm Thick

1 Cum

l Circular wall of Sump 240 mm Thick

1 Cum

m Plain wall of Sump 200 mm Thick

1 Cum

n Plain wall of Sump 210 mm Thick

1 Cum

o Plain wall of Sump 220 mm Thick

1 Cum

p Plain wall of Sump 230 mm Thick

1 Cum

q Plain wall of Sump 240 mm Thick

1 Cum

r Plain wall of Sump 250 mm Thick

1 Cum

s Plain wall of Sump 270 mm Thick

1 Cum

t RCC Dome above 3.66 and up to 4.27 Mts height

1 Cum

u VRCC M 25 for footings

1 Cum

v VRCC M 25 for Slabs 150mm thick above 3.66 and up to 4.27 Mts height

1 Cum

83

Suply and delivery at works site fixing of C.I. heavy weight manhole frame and cover

Each

84

Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles

1 Rmt

85

Painting with synthetic enamel paint in all shades Grade-I two coats

86

Providing high yield strength deformed (HYSD) steel bars of different diameters,

87

Painting to exterior surface of walls with approved water proof cement paints Two coats

10 Sqm

88

Refilling the trenches with excavated soils other than sand

1 Cum

89

Manufacture, supply and delivery of cast iron pipes and fittings (spls.)

Data - Rates - North,South and Central Zones - GHMC

10 Sqm
1 Kg

1 Kg

Page 1369 of 3205


Data
Sl.No

Name of Work

Unit

Pump room
90
91
92

Earth work excavation in Loamy & Clayey Soils manually for trenches
PCC (1:4:8)mix with 40 mm HG m/c metal
V RCC M20 design mix with 320 Kgs Cement with graded metal
a VRCC M20 for footings

1 Cum

b VRCC M20 for Columns up to 3.66 Mts.

1 Cum

c VRCC M20 for Columns 3.66 to 4.27 Mts.

1 Cum

c/1 VRCC M20 for Columns 4.27to 4.88 Mts.

93

1 Cum

1 Cum

1 Cum

d VRCC M20 for beams up to 4.88 Mts

1 Cum

e VRCC M20 for Slabs 125mm thick 4.88 Mts Height

1 Cum

f VRCC M20 for Plinth Beam and Lintels.

1 Cum

RCC M20 design mix with 320 Kgs Cement with graded metal
a RCC M20 for Sun shades 0.075m thick at fixed end and 0.05m at free end

1 Sqm

94

CRS Masonary 2nd Sort in Cement Mortor 1:6

1 Cum

95

Brick Masonary 2nd Class of size 23x11x7 Cm in CM (1:6 )

1 Cum

96

Imprevious coat with CM (1:3) prop., 20mm thick

10 Sqm

97

Plastering 12mm thick in single coat in CM (1:3)

10 Sqm

98

Plastering 20mm thick two coats of 16mm thick in C.M. (1:6) and 4mm thick in C.M. (1:3)

10 Sqm

99

Plastering with 12mm thick in single coat in CM (1:4)

10 Sqm

100

Flooring with 25mm Polished Shabad Stone and Tandur Blue

10 Sqm

101

Flush Pointing to CRS/Brick Masonary in Cement Mortor 1:3

10 Sqm

102

Supply & fixing of Rolling shutter of 80 x 1.25 mm

1 Sqm

103

Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat

1 Sqm

104

1 Sqm

105

Supply, delivery and fixing of 50mm thick precast Cement Jali ventilators of size 0.90x0.45
m
Painting with water proof cement paints in Two coats

106

Providing high yield strength deformed (HYSD) steel bars

107

Supply and delivery of good gravel for filling

1 Cum

108

S&F of Alluminium glazed windows

1 Sqm

Data - Rates - North,South and Central Zones - GHMC

10 Sqm
1 Kg

Page 1370 of 3205


Data
Sl.No

Name of Work

Unit

Valve Chambers
109

Earth work excavation in in Loamy & Clayey Soils

1 Cum

110

PCC (1:4:8)mix with 40 mm HG m/c metal

1 Cum

111

VCC 1:2:4 prop using 20mm to 6mm graded metal

112

VCC 1:2:4 Walls 150 mm thick

1 Cum

VCC 1:2:4 Walls 200 mm thick

1 Cum

VRCC 1:2:4 prop using 20mm to 6mm graded metal


VRCC slab 100mm thick

1 Cum

113

Providing high yield strength deformed (HYSD) steel bars

1 Kg

114

Plastering with 12mm thick in CM (1:4)

115

Manufacture,Supply & Delivery of manhole covers and frames H.D.-20 with 560mm dia

116

Refilling the trenches with excavated soils other than sand

117

Cost of RCC Valve chamber up to 300mm dia pipe

118
119

1 Cum
1 Cum

120

Excavation in all soils up to SDR with machinery


Earthwork excavation in hard rock and boulders more than 3 Cum in size requiring blasting
by machinary
Forming embankment with side earth

121

Forming embankment with borrowed earth

1 Cum

122

Forming embankment with Gravel

1 Cum

10 Sqm
1 No
1 Cum
1 No

LEVELLING THE GROUND

1 Cum

WBM ROAD
123
124
125
126

Excavation in all soils up to SDR with machinery


Earth work excavation in in Loamy & Clayey Soils
Forming WBM road Gr-II, 63 to 45 mm metal
Forming WBM road Gr-III, 53 to 22.4 mm metal

127
128
129
130
131
132
133
134

Earth work excavation in in Loamy & Clayey Soils


Earth work excavation in in Loamy & Clayey Soils for foundations
Collection ,Supply and filling of quarry rubbish
Laying VCC 1:2:4 mix using 20mm to 10mm
Laying VCC (1:4:8) using 40 mm (SS-5) HBG m/c metal
Plastering to walls with 12mm thick in single coat in CM (1:4)
Rough Stone dry packing for revetment using 300mm Cubes
Manufacture, supply and delivery of 600mm dia RCC Plain ended pipes

135

RCC Valve chamber

1 Cum
1 Cum
1 Cum
1 Cum

Pipe Culvert
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Rmt
1 No

Data - Rates - North,South and Central Zones - GHMC

Page 1371 of 3205

Rate
in Rs/5
52.50
13.00
69.50
94.50
100.50
336.15
242.00
2728.35
8.80
612.95
128.10

29.25
80.65
426.20
291.30
19.60
408.40
58.40
52.50
303.60
4037.25
2728.35
1029.60
4506.25

Data - Rates - North,South and Central Zones - GHMC

Page 1372 of 3205


Rate
in Rs/29.25
195.75
80.65
946.00
303.60
219.00
19.60
69.50
94.50
301.00
4648.00

191.00
295.00
542.00
780.00
106.95
165.35
204.00
250.90

1223.15
1576.75
1691.15
1812.45
52.50
2848.60
5762.20
7048.85
1109.60
2030.55
3757.10
129.30
1691.15
7943.00

Data - Rates - North,South and Central Zones - GHMC

Page 1373 of 3205


Rate
in Rs/614.00
20804.00
1356.00
33889.00
1624.00
59206.00
1889.00
29.25
195.75
80.65
946.00
23.00
318.60
219.00
19.60
69.80
88.40
4515.10

281.00
178.00
7.00

55.90
55.90
64.00
92.15
92.15

1192.10
1765.50
2362.05
3100.95
3936.20
4924.75

Data - Rates - North,South and Central Zones - GHMC

Page 1374 of 3205


Rate
in Rs/1068.35
1458.50
2074.05
2777.25
3570.90
4504.70

65.45
95.20
116.65
129.75
198.75
251.10
23.25
23.25
30.00
33.90
43.70
78.40

74.80
112.85
149.95
184.25
219.40
236.90

7869.75
11803.90
20689.10
29262.15
40168.50

49.30
76.30
141.30
191.00
289.10

Data - Rates - North,South and Central Zones - GHMC

Page 1375 of 3205


Rate
in Rs/94.50
142.10
187.60
231.85
277.80

3659.50
4422.50
5915.15
7926.60
116.90
123.35
145.20
169.85

1473.95
2066.25
2456.50
2938.20
3344.30
3941.50
3593.30
4228.60
4777.85
5474.65
4960.85
6369.35
6171.30
7693.20
7704.45

Data - Rates - North,South and Central Zones - GHMC

Page 1376 of 3205


Rate
in Rs/1255.10
1936.95
1927.40
2852.75
2723.00
2623.75
4159.10
3731.45
3715.45
3441.75

1063.00
1940.20
3111.95
4426.25
6427.30

962.05
1548.00
2516.45
3433.75
4863.30
866.10
1437.30
2200.70
2922.70
4138.85
872.80
1361.80
2047.45
2818.95
3899.40

Data - Rates - North,South and Central Zones - GHMC

Page 1377 of 3205


Rate
in Rs/15.00 Mts

17.00 Mts.

33.860

33.960

23.360

23.460

22.940

23.040

22.270

22.370

16.950

17.050

15.670

15.770

14.710

14.810

13.750

13.850

13.330

13.430

12.910

13.010

12.155

12.255

11.400

11.500

9.910

10.010

8.810

8.910

8.648

8.748

8.486

8.586

8.324

8.424

8.162

8.262

8.000

8.100

8.298

8.398

7.560

7.660

7.230

7.330

Data - Rates - North,South and Central Zones - GHMC

Page 1378 of 3205


Rate
in Rs/52.50
3120.85

5193.10
5154.10
5199.20
11685.60
11261.25
10885.30
10547.40
10244.10
9969.65
9719.40
9492.25
9283.50
8998.10
8782.95
8586.80
8408.70
8245.10
8094.10
7826.55
7252.10
5193.10
7133.65
12600.70
1120.65
490.35
58.40
564.50
19.60
69.43

Data - Rates - North,South and Central Zones - GHMC

Page 1379 of 3205


Rate
in Rs/80.65
2848.60
5015.35
5887.35
6098.35
6310.35
6212.35
6020.35
5371.35

404.10
2538.20
3189.15
2078.55
1109.60
1884.70
1029.60
3231.90
931.10
2000.00
679.10
245.00
564.50
58.40
238.60
3410.15

Data - Rates - North,South and Central Zones - GHMC

Page 1380 of 3205


Rate
in Rs/52.50
2848.60
9826.75
8320.10
6034.80
58.40
1029.60
1691.15
19.60
14811.00
13.00
87.00
41.00
130.50
247.00
13.00
52.50
1668.80
2134.55
80.65
52.50
303.60
4037.25
2875.55
1029.60
964.50
2934.65
3750.00

Data - Rates - North,South and Central Zones - GHMC

Page 1381 of 3205

Building Data
Kandukur Municipality
DATA BASED ON - 2015 - 2016 SSR
20/02/16
EARTH WORK EXCAVATION
1

BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an init
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work in
charges etc as per SS - 20 B (APSS 308).

Ordinary Soil-Manual Means-Upto 3 m depth

out put

a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour -Irrigation-Unskilled-S.No.3) exclud-MA
Add Labour component @
Sub total
extra for foundations @

10.00
0 day
3.64 day.
20%
75%

Sub - Total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering
2

14%

0%
0%

BLD-CSTN-2-2(10) : Earth work excavation for foundations and depositing on bank for all lifts and with an init
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work in
charges etc as per SS - 20 B (APSS 308).

Ordinary soils-Mechcanical Means-Upto 3 m depth

out put

a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity (R&B Hire Charges-S.No:4)

240

0 day.
8.32 day.
6.00 hours

Sub - Total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering
3

14%
0%
0%

BLD-CSTN-2-4 (12): Earth work excavation for foundations and depositing on bank for all lifts and with an init
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work in
charges etc as per SS - 20 B (APSS 308).

Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m out put


depth
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour -Irrigation-Unskilled-S.No.3) exclud-MA
Add Labour component @
Sub total
extra for foundations @

10.00
0 day.
5.20 day.
20%
75%

Sub - Total
c&d) Overheads & Contractors Profit
337269598.xlsx data-Bld-14-15

14%

Page 1382 of 3205


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering

337269598.xlsx data-Bld-14-15

0%
0%

Page 1383 of 3205


4

BLD-CSTN-2-5 - (13) : Earth work excavation for foundations and depositing on bank for all lifts and with an ini
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work in
charges etc as per SS - 20 B (APSS 308).
Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m
depth
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity (R&B Hire Charges-S.No:4)

out put

180

0 day.
6.24 day.
6.00 hours

Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering
5

14%

0%
0%

BLD-CSTN-2-6 - (14) : Earth work excavation for foundations and depositing on bank for all lifts and with an ini
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work in
charges etc as per SS - 20 B (APSS 308).
Hard rock (requiring blasting)-Upto 3 m depth
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Driller(Labour-R & B-Skilled-S.No:32)
Blaster(Labour-Irrigation-Skilled-S.No3)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers(Hire ChargesIrrigation-S.No:3)

out put

c) Materials
Gelatin 80 per cent - M-104
Electric Detonators @ 1 detonator for 2 gelatine sticks of 285 gm each
-M-094
Sub total
d) Overheads & Contractors Profit
Sub - Total
Cost for 10 cum = a+b+c+d
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering
6

10

0 day.
0.50 day.
0.25 day.
8.35 day.
1 hours

3.50 Kg
14 Nos.

14%

0%
0%

BLD-CSTN-2-7 - (15) ; Earth work excavation for foundations and depositing on bank for all lifts and with an ini
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work in
charges etc as per SS - 20 B (APSS 308).
Hard rock (blasting prohibited)-Upto 3 m depth
out put
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers(Hire ChargesIrrigation-S.No:3)
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
337269598.xlsx data-Bld-14-15

10.00
0.00 day
5.20 day
6.00 hour

14%

Page 1384 of 3205


Rate per cum = a+b+c+d+e)/10
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering

337269598.xlsx data-Bld-14-15

0%
0%

Page 1385 of 3205


7

RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and tech
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. f
Chambers and Man Holes etc. by manual means,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, column pits, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled S.No1)
3.64 Nos.
Sub total
c&d) Overheads & Contractors Profit
14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @
0%
Add Labour Cess @
0%
Rate per 1 Cum excluding Dewatering

RBR-EECD-9 -ii : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements o
Technical Specification Clause 302.3.5 MORD / 301 MORTH - Mechanical Means (with all lifts)
(B) Mechanical Means (with all lifts)
out put
Taking output = 36 cum
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
0.000 day
Mazdoor (Labour-Irrigation-Unskilled S.No1)
10.400 day
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker attachment @ 6 cum per
6.000 hour
hour
Tipper 5.5 cum capacity tipper, 1 trip per hour(Irri-Sn-55)
6.50 hour
Credit for excavated rock found suitable for use @ 50 per cent of
-18.00 cum
excavated quantity - Irri-M-089
Total
c&d) Overheads & Contractors Profit
Cost for 36 cum = a+b+c+d
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c+d)/36

36.00

14%
0%
0%

Rate per 1 Cum


9

BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not e
deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, i
T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Sand Filling

6.00

Sand Filling in Foundations

a) Material
Sand (C-Mat-S.No1)

6.00 Cum

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.00 day
0.31 day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
337269598.xlsx data-Bld-14-15

14%

Sand Filling in

Page 1386 of 3205


Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

0%
0%

Rate per 1 Cum

337269598.xlsx data-Bld-14-15

Page 1387 of 3205


10

BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers
each deposited layer by watering and ramming including cost and conveyance of water to work site and all op
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Stone Dust Filling

6.00

Gravel filling

a) Material
Gravel (C-Mat-S.No5)

6.00 Cum

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.00 day
0.31 day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

14%
0%
0%

Rate per 1 Cum

11

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundation
not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and c
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 30
out put

Re filling

Earth filling (ordinary soil)

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

6.00
0.00 day
0.31 day
14%
0%
0%

Rate per 1 Cum

12

BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sa
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers,
curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-58)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit

14%
Sub - Total

Add VAT @
Add Labour Cess @
Grand Total

0%
0%
Rate per One Cum
337269598.xlsx data-Bld-14-15

Page 1388 of 3205

337269598.xlsx data-Bld-14-15

Page 1389 of 3205


13

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal m
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-58)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit

14%
Sub - Total

Add VAT @
Add Labour Cess @
Grand Total

0%
0%
Rate per One Cum

14

BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:5:10) prop (Cem
using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like ceme
site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers
curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-58)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

15

BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mi
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-58)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR
337269598.xlsx data-Bld-14-15

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl

Page 1390 of 3205


Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
Sub - Total
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
16

1 hour

0.10 day
1.39 day
14%

BLD-CSTN-3-8 ( 25 ) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:6:10) prop (Cem
using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like ceme
site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers
curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum

A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-58)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

129.60 Kg
0.90 Cum
0.54 Cum
1.20 Kl
0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

17

BLD-CSTN-3-9-(26) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mi
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-58)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

129.60 Kg
0.90 Cum
0.54 Cum
1.20 Kl
1 hour

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

337269598.xlsx data-Bld-14-15

Page 1391 of 3205


18

BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: c
Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregat
on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to t
finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 20mm (C-Mat-S.No:48)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

220.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

19

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Ce
using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials lik
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 1
required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 20mm (C-Mat-S.No:48)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

NOMINAL MIX ( With Wooden Scaffolding)


20

BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes
incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cos
finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20 Nominal mix
337269598.xlsx data-Bld-14-15

Page 1392 of 3205


Coarse aggregate 20mm (C-Mat-S.No:48)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2014-15)

0.90 Cum
0.45 Cum
400.00 Kg

1st Class Mason (Labour-Irrigation- skilled-S.No:11)


2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)

0.133 day.
0.267 day.
3.60 day.

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation


S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) -M-189-b. irrigation SSR
BASIC COST per 1 cum

1.000 hour
1.000 hour
1.20 Kl

Footings
M-20 Nominal mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Sub - Total

Add VAT @
Add Labour Cess @
Rate per One Cum

0%
0%

337269598.xlsx data-Bld-14-15

Page 1393 of 3205


b

Pedastals
M-20 Nominal mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
c

14%
0%
0%

Plinth beams
M-20 Nominal mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
21

14%
0%
0%

BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes
incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cos
finished item of work, but including centering and shuttering charges for COLUMNS, LINTELS, WATER TANKS,
SCAFFOLDING
COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
A. MATERIALS:
Coarse aggregate 20mm (C-Mat-S.No:48)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2014-15)

0.90 cum
0.45 cum
400.00 Kgs

Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) -M-189-b. irrigation SSR

0.167 day
0.167 day
4.700 day

1.00 hour
1.00 hour
1.20 kl

Sub Total of - C
BASIC COST per 1 cum
D. Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total
337269598.xlsx data-Bld-14-15

Page 1394 of 3205


Rate per One Cum
a

Columns up to 3.66 Mts unsupported height above GL


M-20 Nominal mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Basic Cost

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
6923.42
229.00
1268.00
253.60

2F
6923.42
229.00
1395.00
279.00
126.80

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

196.41

392.82

8870.43
1207.71
10078.14
0.00
0.00
10078.14

9346.04
1272.46
10618.50
0.00
0.00
10618.50

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd
floor (7.32 M
Winch hire charges ( 1.333 x 543.60 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
c

Lintels up to 3.66 Mts unsupported height above GL


M-20 Nominal mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


M-20 Nominal mix

1F
6923.42

2F
6923.42

Material Hire Charges for centering & Scaffolding

760.00

760.00

Labour Charges for centering & Scaffolding

903.00

993.00

Add extra over Labour component @ 20%

180.60

198.60

337269598.xlsx data-Bld-14-15

Page 1395 of 3205


For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

90.30

196.412

392.824

8963.43
1220.37
10183.80
0.00
0.00
10183.80

9358.14
1274.11
10632.25
0.00
0.00
10632.25

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd
floor (7.32 M
Winch hire charges ( 1.333 x 543.60 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx data-Bld-14-15

Page 1396 of 3205


22

BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate)
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost an
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes
incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cos
finished item of work, but including centering and shuttering charges for RCC SLABS, BEAMS -WOODEN SCAFFO

RCC SLABS, BEAMS -WOODEN SCAFFOLDING


A. MATERIALS:
Coarse aggregate 20mm (C-Mat-S.No:48)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2014-15)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) -M-189-b. irrigation SSR
Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Total
Rate per One Cum
a

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

0.90 cum
0.45 cum
400.00 Kgs

0.067 day
0.133 day
2.500 day

0.267 hour
0.267 hour
1.200 kl

14%
0%
0%

100 mm
1.00 Cum
10.00 Sqm
10.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

337269598.xlsx data-Bld-14-15

1F
5636.16
1520.00
1210.00
242.00

2F
5636.16
1520.00
1330.00
266.00
121.00

Page 1397 of 3205


For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

8713.52
1186.35
9899.87
0.00
0.00
9899.87

9083.88
1236.77
10320.65
0.00
0.00
10320.65

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd
floor (7.32 M
Winch hire charges ( 0.27 x 543.60 )
Total
Overheads & Contractors Profit @ 0.14
Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
b

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

125 mm
1.00 Cum
8.00 Sqm
8.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
5636.16
1216.00
968.00
193.60

2F
5636.16
1216.00
1064.00
212.80
96.80

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

8119.12
1105.42
9224.54

8436.48
1148.63
9585.11

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd
floor (7.32 M
Winch hire charges ( 0.27 x 543.60 )
Total
Overheads & Contractors Profit @ 0.14
Rate per One Cum
c

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

150 mm
1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @

14%
0%
337269598.xlsx data-Bld-14-15

Page 1398 of 3205


Add Labour Cess @

0%
Total

Rate per One Cum


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
5636.16
1013.84
807.07
161.41

2F
5636.16
1013.84
887.11
177.42
80.71

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

7723.84
1051.60
8775.44
0.00
0.00
8775.44

8005.96
1090.01
9095.97
0.00
0.00
9095.97

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd
floor
(7.32
Winch
hire M
charges ( 0.27 x 543.60 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx data-Bld-14-15

Page 1399 of 3205


d

RCC Beams - Nominal Mix ( Wooden centering )


RCC Beams up to 3.66 Mts height
M-20 Nominal mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
5636.16
1342.00
1064.00
212.80

2F
5636.16
1342.00
1170.00
234.00
106.40

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

8360.32
1138.26
9498.58

8699.28
1184.41
9883.69

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd
floor (7.32 M
Winch hire charges ( 0.27 x 543.60 )
Total
Overheads & Contractors Profit @ 0.14
Rate per One Cum
e

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end and 50mm th. at free end - up to 3.66m above GL
M-20 Nominal mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Sqm


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

337269598.xlsx data-Bld-14-15

1F
352.26
150.00
139.00
27.80

2F
352.26
150.00
153.00
30.60
13.90

Page 1400 of 3205


For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

774.42
105.44
879.86
0.00
0.00
879.86

910.48
123.96
1034.44
0.00
0.00
1034.44

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd
floor (7.32 M
Winch hire charges ( 0.27 x 543.60 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx data-Bld-14-15

Page 1401 of 3205


DESIGN MIX ( Steel Scaffolding & Concrete Mixer )
23

BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using W
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of
(sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incid
batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but ex
and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per
FOOTINGS.
Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be a
the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


RCC-M-20- Design Mix
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Batching plant 0.5 cum ( 6 Cum/hr)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)
BASIC COST per 1 cum

0.80 Cum
0.40 Cum
350.00 Kg
0.133 day.
0.267 day.
4.60 day.
1.333 hour
1.333 hour
1.20 Kl

Footings
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
b

14%
0%
0%

Pedastals
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Rate per One Cum
c

14%

Plinth beams
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Rate per One Cum

14%

337269598.xlsx data-Bld-14-15

Page 1402 of 3205


24

BLD-CSTN-3-15- ( 31 ) -B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using W
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of
(sand) coarse aggregate, water etc., to site , sales & other taxes on all materials including all operational, incid
batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but ex
and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS
TANKS, RCC WALLS IN BUILDINGS.
Note : 1) The cement content is adopted as 350Kg/cum for estimating purpose only.The exact quantities will be a
the cement content is found to be less than 350 Kgs/ Cum the defference in cost shall be deducted.

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1

0.80 cum
0.40 cum
350.00 Kgs

Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Batching plant 0.5 cum ( 6 Cum/hr)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)
Sub Total of - C
BASIC COST per 1 cum
D. Overheads & Contractors Profit
Total
Rate per One Cum
a

0.167 day
0.167 day
5.600 day

1.333 hour
1.333 hour
1.20 kl

14%

Columns up to 3.66 Mts unsupported height above GL


RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Basic Cost

Overheads & Contractors Profit


Rate per One Cum

14%

Rate for other Floors

1F

2F

RCC-M-20- Design Mix

7188.03

7188.03

Material Hire Charges for centering & Scaffolding


Labour Charges for centering & Scaffolding

341.00
1603.00

341.00
1763.00

Add extra over Labour component @ 0.4


For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

320.60

352.60
160.30

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

230.97

461.94

9683.60

10266.87

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 527.90 )
Total
337269598.xlsx data-Bld-14-15

Page 1403 of 3205


Overheads & Contractors Profit @ 0.14
sub total
Rate per One Cum
b

1318.42
11002.02
11002.02

1397.83
11664.70
11664.70

Columns 4.05m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 0.106 on Centering Charges i.e
Add 0.106 on Centering Charges i.e
Add Labour Cess @
Rate per One Cum for 5.00m height

337269598.xlsx data-Bld-14-15

1.00 Cum
0.639 16.67%
341.00
1603.00
0%

Page 1404 of 3205


Columns up to 7.32 Mts unsupported height above GL
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR

1.00 Cum
1.00 Cum

Labour charges Pg No.84 to 89 of Bld.SSR


Add Labour component @

1.00 Cum
20%
Basic Cost

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
c

14%
0%
0%

Lintels up to 3.66 Mts unsupported height above GL


RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
7188.03
1133.00
1141.00
228.20

2F
7188.03
1133.00
1255.00
251.00
114.10

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

230.97

461.94

9921.20

10403.07

1350.77

1416.38

11271.97

11819.45

Add VAT @

0.00

0.00

Add Labour Cess @

0.00

0.00

11271.97

11819.45

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total

Rate per One Cum


d

RCC Walls of Height up to 3.66 Mts un supported Height ( steel Scaffolding )


0.15 m thick
1.00 Cum
6.67 Sqm

RCC-M-20- Design Mix


Centering charges -31.b.4 ,Pg No7 of PH.SSR
Sub - Total

337269598.xlsx data-Bld-14-15

Page 1405 of 3205


Overheads & Contractors Profit

14%

sub total
Add VAT @

0%

Add Labour Cess @

0%

Rate per One Cum


25

BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WE
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conv
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes
incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centeri
excluding cost of steel and its fabrication charges (APSS No. 402) with minimum cement content as per IS code f
BEAMS ( using Steel Scaffolding ) Note : 1) The cement content is adopted as 350Kg/cum for estimating purpos
mix design. 2) As per mix design, if the cement content is found to be less than 350 Kgs/ Cum the defference in cos

RCC SLABS, BEAMS


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1

0.80 cum
0.40 cum
350.00 Kgs

Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Batching plant 0.5 cum ( 6 Cum/hr)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)
Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Total
Rate per One Cum
A
i

RCC Dome
RCC Dome up to 3.66 Mts height
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

0.067 day
0.133 day
3.077 day

0.308 hour
0.308 hour
1.200 kl

14%
0%
0%

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
B
B-I

14%
0%
0%

RCC SLABS
RCC Slabs up to 3.66 Mts unsupported height above GL
337269598.xlsx data-Bld-14-15

Page 1406 of 3205


i

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

75 mm
1.00 Cum
13.33 Sqm
13.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

337269598.xlsx data-Bld-14-15

Page 1407 of 3205


ii

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

100 mm
1.00 Cum
10.00 Sqm
10.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5426.78
2270.00
1520.00
304.00
127.52

2F
5426.78
2270.00
1670.00
334.00
152.00
255.04

9648.30
1313.62
10961.92
0.00
0.00
10961.92

10107.82
1376.18
11484.00
0.00
0.00
11484.00

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 543.6 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

110 mm
1.00 Cum
9.09 Sqm
9.09 Sqm
20%
Sub - Total

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour,
increase
@ 10%
labour
for each
upper floor
on
For Mechanical
Lifting
of all on
RCC
items:charges
Lift Charges
of Materials
only, for
Ground
Floor
Rate
lifting
above
6.1xM543.6
(2nd )floor onwards) Winch/ Lift hire charges
WinchConcrete
hire charges
( 0.27
shall be allowed at the rates as given below:
Total
337269598.xlsx data-Bld-14-15

1F
5426.78
2063.43
1381.82
276.36

2F
5426.78
2063.43
1518.18
303.64
138.18

127.52

255.04

9275.91

9705.25

Page 1408 of 3205


Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx data-Bld-14-15

1262.92
10538.83
0.00
0.00
10538.83

1321.37
11026.62
0.00
0.00
11026.62

Page 1409 of 3205


iii

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

115 mm
1.00 Cum
8.70 Sqm
8.70 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour,
increase
@ 10%
labour
for each
upper floor
on
For Mechanical
Lifting
of all on
RCC
items:charges
Lift Charges
of Materials
only, for
Ground
Floor
Rate
lifting
above
6.1xM543.6
(2nd )floor onwards) Winch/ Lift hire charges
WinchConcrete
hire charges
( 0.27
shall be allowed at the rates as given below:
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
iv

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1F
5426.78
1973.91
1321.74
264.35

2F
5426.78
1973.91
1452.17
290.43
132.17

127.52

255.04

9114.30
1240.91
10355.21
0.00
0.00
10355.21

9530.52
1297.58
10828.10
0.00
0.00
10828.10

120 mm
1.00 Cum
8.33 Sqm
8.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Rate per One Cum

14%

Rate for other Floors


RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate
For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting
above
6.1xM543.6
(2nd )floor onwards) Winch/ Lift hire charges
WinchConcrete
hire charges
( 0.27
shall be allowed at the rates as given below:
Total
Overheads & Contractors Profit @ 0.14
Rate per One Cum
RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
337269598.xlsx data-Bld-14-15

1F
5426.78
1891.67
1266.67
253.33

2F
5426.78
1891.67
1391.67
278.33
126.67

127.52

255.04

8965.97
1220.72
10186.69

9370.15
1275.75
10645.90

125 mm
1.00 Cum
8.00 Sqm

Page 1410 of 3205


Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

8.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

337269598.xlsx data-Bld-14-15

Page 1411 of 3205


Rate for other Floors
RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate
For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting
above
6.1xM543.6
(2nd )floor onwards) Winch/ Lift hire charges
WinchConcrete
hire charges
( 0.27
shall be allowed at the rates as given below:
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
v

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1F
5426.78
1816.00
1216.00
243.20
127.52

2F
5426.78
1816.00
1336.00
267.20
121.60
255.04

8829.50
1202.14
10031.64
0.00
0.00
10031.64

9222.62
1255.66
10478.28
0.00
0.00
10478.28

150 mm
1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5426.78
1514.09
1013.33
202.67
127.52

2F
5426.78
1514.09
1113.33
222.67
101.33
255.04

8284.39
1127.92
9412.31
0.00
0.00
9412.31

8633.24
1175.42
9808.66
0.00
0.00
9808.66

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 543.6 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
ii

150mm thick roof slab at 4.05m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 0.106 on Centering Charges i.e
337269598.xlsx data-Bld-14-15

1.00 Cum
0.639 16.67%
227.00

Page 1412 of 3205


Add 0.106 on Centering Charges i.e
Add Labour Cess @
Rate per One Cum for 4.05m height

337269598.xlsx data-Bld-14-15

152.00
0%

Page 1413 of 3205


vi

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

160 mm
1.00 Cum
6.25 Sqm
6.25 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5426.78
1456.25
981.25
196.25
127.52

2F
5426.78
1456.25
1081.25
216.25
98.13
255.04

8188.05
1114.80
9302.85
0.00
0.00
9302.85

8533.70
1161.86
9695.56
0.00
0.00
9695.56

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 543.6 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
vii

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

200 mm
1.00 Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


Rate for other Floors
RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate
337269598.xlsx data-Bld-14-15

1F
5426.78
1165.00
785.00
157.00

2F
5426.78
1165.00
865.00
173.00
78.50

127.52

255.04

Page 1414 of 3205


For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting
above
6.1xM543.6
(2nd )floor onwards) Winch/ Lift hire charges
WinchConcrete
hire charges
( 0.27
shall be allowed at the rates as given below:
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx data-Bld-14-15

7661.30
1043.09
8704.39
0.00
0.00
8704.39

7963.32
1084.21
9047.53
0.00
0.00
9047.53

Page 1415 of 3205


viii

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

250 mm
1.00 Cum
4.00 Sqm
4.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate
For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting
above
6.1xM543.6
(2nd )floor onwards) Winch/ Lift hire charges
WinchConcrete
hire charges
( 0.27
shall be allowed at the rates as given below:
Total
Overheads & Contractors Profit @ 0.14
sub total
Sub - Total
Add VAT @
Rate per One Cum
ix

RCC M 20 Slabs
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1F
5426.78
932.00
628.00
125.60

2F
5426.78
932.00
692.00
138.40
62.80

127.52

255.04

7239.90
985.71
8225.61
0.00
0.00
8225.61

7507.02
1022.08
8529.10
0.00
0.00
8529.10

325 mm
1.00 Cum
3.08 Sqm
3.08 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
C
i

14%
0%
0%

RCC Beams:( Steel Scaffolding )


RCC Beams up to 3.66 Mts height
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

337269598.xlsx data-Bld-14-15

Page 1416 of 3205

337269598.xlsx data-Bld-14-15

Page 1417 of 3205


Rate for other Floors
RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
5426.78
2002.00
1344.00
268.80

2F
5426.78
2002.00
1478.00
295.60
134.40

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

127.52

255.04

9169.10
1248.37
10417.47

9591.82
1305.93
10897.75

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
Rate per One Cum
ii

Beams 4.05m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 0.106 on Centering Charges i.e
Add 0.106 on Centering Charges i.e

2002.00
1344.00

Add Labour Cess @


Rate per One Cum for 4.05m height
D

1.00 Cum
0.639 16.67%

0%

RCC M -20 for Sun shades of 0.60M width, 75mm th. at fixed end and
50mm th. at free end
RCC-M-20- Design Mix
Centering charges ,Pg No.84 to 89 of Bld.SSR
Labour charges Pg No.84 to 89 of Bld.SSR
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%
Total

Rate per One Sqm


Rate for other Floors
RCC-M-20- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
339.17
224.00
175.00
35.00

2F
339.17
224.00
193.00
38.60
17.50

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

7.97

15.94

337269598.xlsx data-Bld-14-15

Page 1418 of 3205


For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
26

781.14
106.35
887.49
0.00
0.00
887.49

828.21
112.76
940.97
0.00
0.00
940.97

BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mi
grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cuttin
placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of
work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages s
bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges suc
tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.1

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage -(ENCPH.Memo.No.146/Cement
& Steel
T13,
/ 2013-14)
Binding wire- SSR (Irrigation)
item /No
Sub-Total - A
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing and
placing in position
Blacksmith / Bar bender (Labour-Irrigation-Skilled-S.N.1)
Mazdoor (Unskilled)
Sub-Total -B
Total of A+B
(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
Add VAT @
Add Labour Cess @
Rate per One MT
Rate per One Kg

1.05 Ton
6.00 kg

10.00 day
10.00 day

14%
0%
0%

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
45840.00
972.00

2F
45840.00
1944.00

Total
Material Hire Charges for centering & Scaffolding
Rate per 1MT
Rate per 1 Kg

46812.00
6373.45
53185.45
53.19

47784.00
6505.79
54289.79
54.29

337269598.xlsx data-Bld-14-15

Page 1419 of 3205


27

MASONRY
BLD-CSTN-5-1 (39) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Morto
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, includ
Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

Ground moulded size 23x11x7 Cm - (1:6)

A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1)


Bricks traditional size 23 x 11 x 7 cms 2nd class ( C-Mat-S.No.63)
Sand - (C-Mat-S.No:2)

0.20 Cum

Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)

0.24 day.
0.56 day.
1.89 day.

Sub Total of - B
Total A+B
c.Overheads & Contractors Profit
Sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed. Vide, Sn.12 of corrigendom - Procs. No.
CEB/TA8L~.EJ:]/SSR: 2009-10 Dt:29-01-2010

1F
4214.55
43.17
255.04
51.01

2F
4214.55
43.170
361.00
72.20
127.52

For Lift Charges of Labour, increase @ 10% on labour charges of


respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

109.87

219.74

4673.64
636.32
5309.96
0.00
0.00
5309.96

5038.18
685.95
5724.13
0.00
0.00
5724.13

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
28

96.00 Kg
512 Nos

BLD-CSTN-5-2 (40) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Morto
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, includ
Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

size 23x11x7 Cm - (1:4)

A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Bricks traditional size 23 x 11 x 7 cms 2nd class ( C-Mat-S.No.63)
Sand - (C-Mat-S.No:2)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
337269598.xlsx data-Bld-14-15

72.00 Kg
512 Nos
0.20 Cum

0.24 day.

Ground moulded size 23x11x7 C

Page 1420 of 3205


2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
Total A+B
c.Overheads & Contractors Profit
Sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

337269598.xlsx data-Bld-14-15

0.56 day.
1.89 day.

14%
0%
0%

Page 1421 of 3205


Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed. Vide, Sn.12 of corrigendom - Procs. No.
CEB/TA8L~.EJ:]/SSR: 2009-10 Dt:29-01-2010

1F
4076.79
43.17
255.04
51.01

2F
4076.79
43.170
361.00
72.20
127.52

For Lift Charges of Labour, increase @ 10% on labour charges of


respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

109.87

219.74

4535.88
617.56
5153.44
0.00
0.00
5153.44

4900.42
667.19
5567.61
0.00
0.00
5567.61

29

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, includi
Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

Ground moulded size 23x11x7 Cm - (1:6)

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Bricks traditional size 23 x 11 x 7 cms 2nd class ( C-Mat-S.No.63)
Sand - (C-Mat-S.No:2)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum

48.00 Kg
512 Nos
0.20 Cum

0.24 day.
0.56 day.
1.89 day.

14%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed. Vide, Sn.12 of corrigendom - Procs. No.
CEB/TA8L~.EJ:]/SSR: 2009-10 Dt:29-01-2010

1F
3939.03
43.17
255.04
51.01

2F
3939.03
43.170
361.00
72.20
127.52

For Lift Charges of Labour, increase @ 10% on labour charges of


respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

109.87

219.74

4398.12
598.80

4762.66
648.44

Total
Overheads & Contractors Profit @ 0.14
337269598.xlsx data-Bld-14-15

Page 1422 of 3205


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

4996.92
0.00
0.00
4996.92

337269598.xlsx data-Bld-14-15

5411.10
0.00
0.00
5411.10

Page 1423 of 3205


30

BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance o
charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Sup

Flyash blocks - 290 x 225 x 140 mm - (1:6)

A. MATERIALS:

Flyash Blocks size 29 x 22.5 x 14 cms (C-Mat-S.N.66)


Cost of Cement Mortar ( 1:6 ) -Mortars-(g)

99 Nos
0.10 Cum

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)

0.42 day.
0.92 day.
2.80 day.

Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed. Vide, Sn.12 of corrigendom - Procs. No.
CEB/TA8L~.EJ:]/SSR: 2009-10 Dt:29-01-2010

1F
4312.51
44.13
260.71
52.14

2F
4312.51
44.130
369.02
73.80
130.36

For Lift Charges of Labour, increase @ 10% on labour charges of


respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

170.09

340.18

4839.58
658.91
5498.49
0.00
0.00
5498.49

5270.00
717.51
5987.51
0.00
0.00
5987.51

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
31

14%

BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance o
charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Sup

Flyash blocks - 290 x 200 x 140 mm - (1:6)

A. MATERIALS:

Flyash Blocks size 29 x 20 x 14 cms (C-Mat, S.No.67)


Cost of Cement Mortar ( 1:6) - ( Mortars-S.No.h)

111 Nos
0.10 Cum

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)

0.42 day.
0.92 day.
2.80 day.

Total A+B
c.Overheads & Contractors Profit
sub total
337269598.xlsx data-Bld-14-15

14%

Flyash blocks -

Page 1424 of 3205


Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

0%
0%

337269598.xlsx data-Bld-14-15

Page 1425 of 3205


Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%

1F
4045.51
49.65
293.30
58.66

2F
4045.51
49.650
415.15
83.03
146.65

For Lift Charges of Labour, increase @ 10% on labour charges of


respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

170.09

340.18

4617.21
628.63
5245.84
0.00
0.00
5245.84

5080.17
691.67
5771.84
0.00
0.00
5771.84

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

Flyash blocks - 290 x 150 x 140 mm - (1:6)

32

BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150 x
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance o
charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Sup
A. MATERIALS:

Flyash Blocks size 29 x 15 x 14 cms (C-Mat, S.No.68)


Cost of Cement Mortar ( 1:6 )

148 Nos
0.10 Cum

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)

0.42 day.
0.92 day.
2.80 day.

Total A+B
c.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
4748.51
66.20
391.07
78.21

2F
4748.51
66.20
553.53
110.71
195.54

170.09

340.18

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

5454.08
742.57
6196.65
0.00
0.00
6196.65

6014.66
818.90
6833.56
0.00
0.00
6833.56

337269598.xlsx data-Bld-14-15

Page 1426 of 3205


33

BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/1
solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and con
seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for wa

Flyash blocks - 290 x 100 x 140 mm - (1:6)

A. MATERIALS:

34

Flyash Blocks size 29 x 10 x 14 cms (C-Mat, S.No.69)


Cost of Cement Mortar ( 1:6 ) ( Mortars-g)

198 Nos
0.10 Cum

B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)

0.42 day.
0.92 day.
2.80 day.

Total A+B
c.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
4114.51
88.66
523.75
104.75

2F
4114.51
88.66
741.34
148.27
261.88

170.09

340.18

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

5001.76
680.99
5682.75
0.00
0.00
5682.75

5694.83
775.35
6470.18
0.00
0.00
6470.18

BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second cla
all materials, seigniorage charges, labour and all operations for constructing half brick masonry, mixing cement mor
of work, but excluding conveyance charges of materials.

5 cm wide Brick masonry - (1:3)

A. MATERIALS:

Bricks traditional size 23 x 11 x 7 cms 2nd class


Cement
Fine aggregate (Sand)
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)

337269598.xlsx data-Bld-14-15

565 Nos
106.00 Kg
0.22 Cum

0.60 day.
0.60 day.
2.75 day.

11.5 cm wide Bric

Page 1427 of 3205


Add Water charges@ 1%
Total A+B
c.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

337269598.xlsx data-Bld-14-15

1%
14%
0%
0%

Page 1428 of 3205


Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%

1F
5125.05
86.35
510.09
102.02

2F
5125.05
86.35
722.00
144.40
255.05

For Lift Charges of Labour, increase @ 10% on labour charges of


respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

162.84

325.68

5986.35
815.04
6801.39
0.00
0.00
6801.39

6658.53
906.56
7565.09
0.00
0.00
7565.09

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
35

BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite
materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charg
shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

36

67.20 Kg
0.94 Cum
0.16 Cum
0.28 Cum
2.50 day
2.32 day
14%
0%
0%

BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite
materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charg
shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
337269598.xlsx data-Bld-14-15

76.80 Kg
0.94 Cum
0.16 Cum
0.32 Cum
1.50 day
2.32 day
14%
0%
0%

Page 1429 of 3205

337269598.xlsx data-Bld-14-15

Page 1430 of 3205


37

BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone inc
like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for c
mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Rough Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

38

1.20 day
2.00 day
14%
0%
0%

BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone inc
like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for c
mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Rough Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

39

79.20 Kg
0.44 Cum
0.50 Cum
0.16 Cum
0.33 Cum

59.40 Kg
0.44 Cum
0.50 Cum
0.16 Cum
0.33 Cum
1.20 day
2.00 day
14%
0%
0%

POINTING AND PLASTERING


BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including
, seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item of w
A. MATERIALS:
Cement
Fine aggregate (Sand) (C-Mat-Sn.3)
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
337269598.xlsx data-Bld-14-15

14.40 Kg
0.03 Cum
0.50 day
0.74 day
14%
0%
0%

Page 1431 of 3205


Rate per 10 Sqm
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

Page 1432 of 3205


40

BLD-CSTN-7-3-(74) : Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for includ
site , seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item
A. MATERIALS:
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

41

28.80 Kg
0.06 Cum
0.50 day
0.74 day
14%
0%
0%

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost a
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges e
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.15 Cum
0.60 day
0.96 day
Sub-Total of Labour

Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding ( for Ceiling)
Labour Charges for Scaffolding ( for Ceiling)
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed. Vide, Sn.12 of corrigendom - Procs. No.
CEB/TA8L~.EJ:]/SSR: 2009-10 Dt:29-01-2010

1F
1231.12
23.70
119.50
23.90

2F
1231.12
23.70
167.50
33.50
59.75

For Lift Charges of Labour, increase @ 10% on labour charges of


respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

67.10

134.21

1465.32
199.50
1664.82
166.48

1649.78
224.62
1874.40
187.44

Total
Overheads & Contractors Profit @ 0.14
Rate per 10 Sqm
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

Page 1433 of 3205


42

BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost a
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges e
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.15 Cum
0.60 day
0.96 day
Sub-Total of Labour

Total A+B
C.Overheads & Contractors Profit
Rate per 10 Sqm
Rate per 1 Sqm

43

14%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
1127.80
9.90
58.70
11.74

2F
1127.80
9.90
83.00
16.60
29.35

67.10

134.21

Total
Overheads & Contractors Profit @ 0.14
Rate per 10 Sqm
Rate per 1 Sqm

1275.24
173.62
1448.86
144.89

1400.86
190.73
1591.59
159.16

BLD-CSTN-8-4-(79): Plastering with 12mm thick in single coat in CM (1:6) finished smooth including cost a
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges e
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:6)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.15 Cum
0.60 day
0.96 day
Sub-Total of Labour

Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
337269598.xlsx data-Bld-14-15

14%
0%
0%

1F
1024.48
9.90
58.70
11.74

2F
1024.48
9.90
83.00
16.60
29.35

Page 1434 of 3205


For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm
44

67.10

134.21

1171.92
159.56
1331.48
0.00
0.00
1331.48
133.15

1297.54
176.66
1474.20
0.00
0.00
1474.20
147.42

BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost a
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges e
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.19 Cum
0.60 day
0.96 day
Sub-Total of Labour

Total A+B
C.Overheads & Contractors Profit
Rate per 10 Sqm
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

14%

Page 1435 of 3205

45

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
1249.60
9.90
58.70
11.74

2F
1249.60
9.90
83.00
16.60
29.35

67.10

134.21

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

1397.04
190.21
1587.25
0.00
0.00
1587.25
158.73

1522.66
207.31
1729.97
0.00
0.00
1729.97
173.00

BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost a
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges e
necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.21 Cum
0.94 day
1.60 day
Sub-Total of Labour

Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
1727.63
9.90
58.70
11.74

2F
1727.63
9.90
83.00
16.60
29.35

108.82

217.63

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

1916.79
260.97
2177.76
0.00
0.00
2177.76
217.78

2084.11
283.75
2367.86
0.00
0.00
2367.86
236.79

337269598.xlsx data-Bld-14-15

Page 1436 of 3205


46

BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4m
finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges,
charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessa
of uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
Cement
Fine aggregate (Sand)
Top Coat in CM(1:4), 4 mm thick
Cement
Fine aggregate (Sand)

43.00 Kg
0.18 Cum
14.50 Kg
0.04 Cum
Sub-Total- for Cost of Material

B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.63 day
1.47 day
3.90 day
Sub-Total- for Cost of Labour

Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

47

14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
2980.90
9.90
58.70
11.74

2F
2980.90
9.90
83.00
16.60
29.35

247.66

495.32

Total
Overheads & Contractors Profit @ 0.14
Rate per 10 Sqm
Rate per 1 Sqm

3308.90
450.51
3759.41
375.94

3615.07
492.19
4107.26
410.73

BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coa
sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage c
labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever ne
work.
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM (1:5), 8 mm thick
Cement
Fine aggregate (Sand)
Top Coat in CM (1:4), 4 mm thick
Cement
Fine aggregate (Sand)

31.70 Kg
0.11 Cum
19.20 Kg
0.04 Cum
Sub-Total- for Cost of Material

337269598.xlsx data-Bld-14-15

Page 1437 of 3205


B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.63 day
1.47 day
3.90 day
Sub-Total- for Cost of Labour

Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

14%
0%
0%

Page 1438 of 3205

48

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
2887.58
9.90
58.70
11.74

2F
2887.58
9.90
83.00
16.60
29.35

247.66

495.32

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

3215.58
437.80
3653.38
0.00
0.00
3653.38
365.34

3521.75
479.49
4001.24
0.00
0.00
4001.24
400.12

BLD-CSTN-8-11-(86) : RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinfor
with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & o
incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift
of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903)
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh - BMT-F.28
Cement Mortar 1:3 for 25 mm thick
Dry Cement for making Lumps
12 mm plastering 2 coats in 1:4 & 1:2 cm both sides Excluding HYSD
Steel/ Mild steel & Binding wire
Sub-Total- for Cost of Material
B) LABOUR CHARGES
1st Class Mason
Miller Operator
Mazdoor (unskilled)
Sub-Total- for Cost of Labour
c) Machinery
Machine Mixing Mortar with Miller - Hire charges
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @

13.30 sqm
0.25 cum
50.00 kg
21.80 sqm

8.00 day
1.00 day
10.00 day

2.00 Hrs
14%
0%
0%

Rate per 10 Sqm


Rate per 1 Sqm
Rate for other Floors
Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
13058.61
832.20

2F
13058.61
1664.40

Total
Overheads & Contractors Profit @ 0.14

13890.81
1891.23

14723.01
2004.54

337269598.xlsx data-Bld-14-15

Page 1439 of 3205


sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

15782.04
0.00
0.00
15782.04
1578.20

337269598.xlsx data-Bld-14-15

16727.55
0.00
0.00
16727.55
1672.76

Page 1440 of 3205


FLOORING, DADOING, CLADING & SKIRTING
49

BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone sla
already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs pe
depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including
dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance of all material
Unit = 10 sqm
A. MATERIALS:
Polished Shahabad/ Tandur stone slabs of 15 to 18 mm thick
(0.457x0457) - BMT-B.05
Cement for CM (1:8) proportion for base coat
Cement for slurry
Cement for jointing
Sand for CM (1:8) proportion (C-Mat-Sn.3)
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Sub-Total- for Cost of Labour
Sub-Total
Add water charges 1%
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

50

11.00 sqm
21.60 kg.
33.00 kg.
20.00 kg.
0.12 cum

3.10 day
1.10 day
0.86 day

1.00%
14%
0%
0%

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
4785.69
238.76

2F
4785.69
477.53

Total
Overheads & Contractors Profit @ 0.14
Rate per 10 Sqm
Rate per 1 Sqm

5024.45
684.08
5708.53
570.85

5263.22
716.59
5979.81
597.98

BLD-CSTN-9-1-(99) - A : Flooring with Polished Bethamcherla coloured stone minimum 25 mm thick (0.2
(1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread
cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., comple
charges for dressing of flooring stones etc., complete for finished item of work, including the cost and conveyance o
Unit = 10 sqm
A. MATERIALS:
Polished Bethamcherla coloured stone minimum 25 mm thick
(0.254M x 0.254M) - BMT-B.08
Cement for CM (1:8) proportion for base coat
Cement for slurry
Cement for jointing
Sand for CM (1:8) proportion (C-Mat-Sn.3)
Sub-Total- for Cost of Material
B. LABOUR:
337269598.xlsx data-Bld-14-15

11.00 sqm
21.60 kg.
33.00 kg.
20.00 kg.
0.12 cum

Page 1441 of 3205


Mason 1 class
Mason 2nd class
Mazdoor (unskilled)

3.10 day
1.10 day
0.86 day

st

Sub-Total- for Cost of Labour


Sub-Total
Add water charges 1%
Grand Total
over heads & contractors profit
Rate per 10 Sqm
Rate per 1 Sqm

1.00%
14%

337269598.xlsx data-Bld-14-15

Page 1442 of 3205

51

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
6010.02
238.76

2F
6010.02
477.53

Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

6248.78
850.77
7099.55
0.00
0.00
7099.55
709.96

6487.55
883.28
7370.83
0.00
0.00
7370.83
737.08

BLD-CSTN-9-2-(100) : Flooring with 40 mm thick Rough Cuddapah/Shabad stones, set over base coat of cemen
already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost o
sand, and water etc., complete, including seigniorage charges, labour charges for dressing of flooring sto
work,including the cost and conveyance of all materials.
A. MATERIALS:
Shahabad / Tandur Rough Stone slabs of minimum 40 mm thick - BMTB.04
Cement for CM (1:8) proportion for base coat
Cement for CM 1:3 proportion for pointing
Sand for CM (1:8) proportion
Sand for CM (1:3) proportion
Sub-Total- for Cost of Material
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Sub-Total- for Cost of Labour
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

52

10.50 Sqm
21.60 Kg
9.60 Kg
0.12 Cum
0.02 Cum

0.960 day
2.240 day
3.30 day

14%
0%
0%

BLD-CSTN-9-4-(102) : Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coa
CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs p
depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc.,
complete for finished item of work, including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 22 mm thick - 0.254 M x 0.406 M (medium
shade) - BMT-D.01
Cement for CM (1:6) proportion for base coat
Cement for slurry
Cement for jointing & pointing
Pigment
Sand for CM (1:6) proportion
Sub-Total- for Cost of Material
B. MACHINERY
337269598.xlsx data-Bld-14-15

10.50 sqm
28.80 kg.
33.00 kg.
6.00 kg.
0.00 kg.
0.12 cum

Page 1443 of 3205


Nill
C. LABOUR
Mason 2nd class
Man mazdoor
Mazdoor (unskiled)

0.960 day
2.240 day
3.30 day
Sub-Total- for Cost of Labour

Add water charges 1%


Total
over heads & contractors profit

1.00%
14%
Rate per 10 Sqm

Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

Page 1444 of 3205

53

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
6412.09
255.94

2F
6412.09
511.87

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

6668.03
907.85
7575.88
0.00
0.00
7575.88
757.59

6923.96
942.70
7866.66
0.00
0.00
7866.66
786.67

BLD-CSTN-9-5-(103) : Vitrified polished floor tiles of size not less than 900 x 900 mm x 10 mm thickness
glossy finish/ premium colours special series, set over base coat of cement mortar (1:8), 12 mm thick ove
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cemen
matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorag
of work, including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size- medium shade -900x900x10mm - BMTC.53
Cement for CM (1:8) for base coat
Cement for slurry
Cement for Pointing with CM (1:3)
Sand for CM (1:8)
Sand for pointing

10.50 sqm
21.60 kg.
33.00 kg.
6.000 kg.
0.12 cum
0.020 cum

Sub-Total- for Cost of Material


B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

0.96 day
2.24 day
3.30 day
Sub-Total- for Cost of Labour

Add water charges 1%


Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @

1.00%
14%
0%
0%
Rate per 10 Sqm

Rate per 1 Sqm


Rate for other Floors
Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
18085.19
275.90

2F
18085.19
551.81

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @

18361.09
2499.86
20860.95
0.00
0.00

18637.00
2537.43
21174.43
0.00
0.00

337269598.xlsx data-Bld-14-15

Page 1445 of 3205


Rate per 10 Sqm
Rate per 1 Sqm

20860.95
2086.10

337269598.xlsx data-Bld-14-15

21174.43
2117.44

Page 1446 of 3205


54

BLD-CSTN-9-5-(103) : Flooring with vitrified tiles 1st quality of size 598 x 598 mm x 8 mm thickness, regu
base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement s
3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, includ
water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, including the c

Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size- normal shade -598 x 598 mm x 8 mm
thickness -BMT-C.16
Cement for CM (1:8) for base coat
Cement for slurry
Cement for Pointing with CM (1:3)
Sand for CM (1:8)
Sand for pointing

10.50 sqm
21.60 kg.
33.00 kg.
6.000 kg.
0.12 cum
0.020 cum

Sub-Total- for Cost of Material


B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

0.96 day
2.24 day
3.30 day
Sub-Total- for Cost of Labour

Add water charges 1%


Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @

1.00%
14%
0%
0%
Rate per 10 Sqm

Rate per 1 Sqm


Rate for other Floors
Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

1F
9951.16
275.90

2F
9951.16
551.81

10227.06
1392.41
11619.47
0.00
0.00
11619.47
1161.95

10502.97
1429.98
11932.95
0.00
0.00
11932.95
1193.30

Page 1447 of 3205


55

BLD-CSTN-9-5-(103) :Vitrified polished floor tiles of size not less than 1000 x 1000 x 10 mm thickness high g
base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement s
3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, includ
water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, including the c

Unit = 10 sqm
A. MATERIALS:
Vitrified polished floor tiles of size not less than 1000 x 1000 x 10 mm
thickness high glossy finish/ premium colours - BMT-C.50
Cement for CM (1:8) for base coat
Cement for slurry
Cement for Pointing with CM (1:3)
Sand for CM (1:8)
Sand for pointing

10.50 sqm

21.60 kg.
33.00 kg.
6.000 kg.
0.12 cum
0.020 cum
Sub-Total- for Cost of Material

B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

0.96 day
2.24 day
3.30 day
Sub-Total- for Cost of Labour

Add water charges 1%


Grand Total
over heads & contractors profit

1.00%
14%
Rate per 10 Sqm

Rate per 1 Sqm


Rate for other Floors
Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

1F
21786.34

2F
21786.34

275.90

551.81

22062.24
3003.77
25066.01
0.00
0.00
25066.01
2506.60

22338.15
3041.34
25379.49
0.00
0.00
25379.49
2537.95

Page 1448 of 3205


56

BLD-CSTN-9-6-(104) : Flooring with Ceramic floor tiles of notless than 7.3mm thick 1st quality (Non
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like
jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all m
etc., complete, including seigniorage charges, etc., complete for finished item of work,including the cost and convey

Unit = 10 sqm
A. MATERIALS:

Ceramic floor tiles of notless than 7.3mm thick 1st quality - BMTC.01
Cement for CM (1:8) for base coat
Cement for slurry
White cement - BMS-W.68
Sand for CM (1:8)
Sub-Total- for Cost of Material
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Sub-Total- for Cost of Labour
Sub total of Material and Labour
Add water charges 1%
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

10.50 sqm
21.60 kg.
33.00 kg.
2.00 kg.
0.12 cum

0.96 Nos
2.24 Nos
3.30 Nos

1.00%
14%
0%
0%

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
8197.17
275.90

2F
8197.17
551.81

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

8473.07
1153.61
9626.68
0.00
0.00
9626.68
962.67

8748.98
1191.17
9940.15
0.00
0.00
9940.15
994.02

337269598.xlsx data-Bld-14-15

Page 1449 of 3205


57

BLD-CSTN-9-7-(105) : High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black / prem
cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of hon
sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of
tilesetc., complete, including seigniorage charges, labour charges for dressing of tilesetc., complete for finish
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
High polished granite 16 to 18 mm thick slab other than black - BMT-B-9

10.50 sqm

Cement for CM (1:8) for base coat


Cement for slurry
White cement for jointing & pointing
Cement for jointing
Sand for CM (1:8)

36.00 kg.
33.00 kg.
6.00 kg.
kg.
0.20 cum
Sub-Total- for Cost of Material

B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

3.00 day
1.00 day
8.00 day
Sub-Total- for Cost of Labour
Sub total of Material and Labour

Add water charges 1%


Grand Total
over heads & contractors profit

1.00%
14%
Sub Total

Add VAT @
Add Labour Cess @
Total cost for 10 sqm

0%
0%
Rate per 10 Sqm

Rate per 1 Sqm


Rate for other Floors
Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
36945.59
503.40

2F
36945.59
1006.80

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

37448.99
5098.68
42547.67
0.00
0.00
42547.67
4254.77

37952.39
5167.22
43119.61
0.00
0.00
43119.61
4311.96

337269598.xlsx data-Bld-14-15

Page 1450 of 3205


58

BLD-CSTN-9-8-(106) : Flooring with Polished Marble slabs of gang saw cut 16 mm to 20 mm (average) thick
base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement s
3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, includ
water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding
Unit = 10 sqm
A. MATERIALS:
Polished Marble slabs- gang saw cut16 mm to 20 mm (average) thick
( 0.610 M width of any length)-BMT-B.14
Cement for CM (1:8) for base coat
Cement for slurry
White cement for jointing & pointing
Sand for CM (1:8)

10.50 sqm
36.00 kg.
33.00 kg.
5.00 kg.
0.20 cum

Sub-Total- for Cost of Material


B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

3.00 day
1.00 day
8.00 day
Sub-Total- for Cost of Labour
Sub total of Material and Labour

Add water charges 1%


Grand Total
over heads & contractors profit

1.00%
14%
Sub Total

Add VAT @
Add Labour Cess @
Total cost for 10 sqm

0%
0%
Rate per 10 Sqm

Rate per 1 Sqm


Rate for other Floors
Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
16281.25
503.40

2F
16281.25
1006.80

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

16784.65
2285.23
19069.88
0.00
0.00
19069.88
1906.99

17288.05
2353.77
19641.82
0.00
0.00
19641.82
1964.18

337269598.xlsx data-Bld-14-15

Page 1451 of 3205


59

BLD-CSTN-9-8-(106) : Flooring with Polished Marble slabs polished 16 mm to 20 mm (average) thick 0.305 M
mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like
jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all m
etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conv
Unit = 10 sqm
A. MATERIALS:
Polished Marble slabs polished 16 mm to 20 mm (average) thick 0.305 M
x 0.305 M - BMT-B.13
Cement for CM (1:8) for base coat
Cement for slurry
White cement for jointing & pointing
Sand for CM (1:8)

10.50 sqm
36.00 kg.
33.00 kg.
5.00 kg.
0.20 cum

Sub-Total- for Cost of Material


B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

3.00 day
1.00 day
8.00 day
Sub-Total- for Cost of Labour
Sub total of Material and Labour

Add water charges 1%


Grand Total
over heads & contractors profit

1.00%
14%
Sub Total

Add VAT @
Add Labour Cess @
Total cost for 10 sqm

0%
0%
Rate per 10 Sqm

Rate per 1 Sqm


Rate for other Floors
Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
11933.20
503.40

2F
11933.20
1006.80

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

12436.60
1693.24
14129.84
0.00
0.00
14129.84
1412.98

12940.00
1761.78
14701.78
0.00
0.00
14701.78
1470.18

337269598.xlsx data-Bld-14-15

Page 1452 of 3205


60

BLD-CSTN-9-13-(111) : Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard
CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the
slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, includin
finished item of work.
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed) C-Mat-46
Cement
Sand
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

0.17 Cum
120.00 Kg
0.085 Cum

1.25 day
0.06 day
3.00 day
Sub total of Material and Labour

Add water charges 1%


Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

61

1.00%
14%
0%
0%

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
2865.03
180.90

2F
2865.03
361.80

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

3045.93
414.70
3460.63
0.00
0.00
3460.63
346.06

3226.83
439.33
3666.16
0.00
0.00
3666.16
366.62

BLD-CSTN-9-15-(113): Flooring with Cement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over
the top surface to required smoothness and slopes and thread lining including cost of all materials like cemen
including seigniorage charges, etc., complete for finished item of work.
Unit = 10 sqm
A. MATERIALS:
Cement Concrete 1:6:10 using concrete mixer
Plastering with CM (1:3), 12 mm thick
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Total
over heads & contractors profit
sub total
Add VAT @
337269598.xlsx data-Bld-14-15

1.00 cum
10.00 sqm
0.15 day
0.35 day
5.40 day
1.00%
14%
0%

Page 1453 of 3205


Add Labour Cess @
Rate per 10 Sqm

0%

337269598.xlsx data-Bld-14-15

Page 1454 of 3205


62

BLD-CSTN-9-18-(116): Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30
set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 k
paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, s
seigniorage charges, etc., complete for finished item of work,including the cost and conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles 7.30 mm thick
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing - BMS-W.68
B. LABOUR
Mason 1st class
Mazdoor (unskiled)

0.77 Nos
0.80 Nos

Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

63

10.50 sqm
0.12 cum
57.60 kgs
33.00 kgs
6.00 kgs

14%
0%
0%

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
6374.89
69.53

2F
6374.89
139.06

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

6444.42
877.41
7321.83
0.00
0.00
7321.83
732.18

6513.95
886.87
7400.82
0.00
0.00
7400.82
740.08

BLD-CSTN-9-23-(121): Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm thick p


flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread a
with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shah
complete including seigniorage charges, etc., complete for finished item of work, including the cost and conveyance
Unit = 10 sqm
A. MATERIALS:
15 to 18 mm thick polished Shahabad stone (White)
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskiled)

11.00 sqm
0.12 cum
57.60 kgs
33.00 kgs

0.96 Nos
2.24 Nos
3.10 Nos
337269598.xlsx data-Bld-14-15

Page 1455 of 3205

Add water charges 1%


Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

1.00%
14%
0%
0%

337269598.xlsx data-Bld-14-15

Page 1456 of 3205

64

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
5176.00
268.22

2F
5176.00
536.45

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

5444.22
741.23
6185.45
0.00
0.00
6185.45
618.55

5712.45
777.75
6490.20
0.00
0.00
6490.20
649.02

BLD-CSTN-9-21 - (119) : Providing skirting to internal walls to 15 cm height/risers of steps with 8 mm thick mirr
flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread a
with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tile
including seigniorage charges, etc., complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
8 mm thick mirror polished granite tiles - BMT-B.16
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing- BMS-W.68

10.50 sqm
0.12 cum
57.60 kgs
33.00 kgs
5.00 kgs

B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskilled)

2.10 day
0.80 day
4.90 day

Add water charges 1%


Grand Total
over heads & contractors profit

1.00%
14%
Sub Total

Add VAT @
Add Labour Cess @
Total cost for 10 sqm
Rate per 10 Sqm
Rate per 1 Sqm

0%
0%

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
14703.19
330.00

2F
14703.19
660.00

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

15033.19
2046.77
17079.96
0.00
0.00
17079.96
1708.00

15363.19
2091.70
17454.89
0.00
0.00
17454.89
1745.49

337269598.xlsx data-Bld-14-15

Page 1457 of 3205


65

BLD-CSTN-9-20 - (118) : Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles leng
coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm a
with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.
etc., complete for finished item of work,
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles polished 1st quality - BMT-C.16
Sand for cm 1:5 base coat
Cement for cm 1:5 base coat
Cement for slurry
White cement for jointing & pointing - BMS-W.68

10.50 sqm
0.12 cum
34.56 kgs
33.00 kgs
2.00 kgs

B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskilled)

0.96 day
2.24 day
3.30 day

Add water charges 1%


Grand Total
over heads & contractors profit

1.00%
14%
Sub Total

Add VAT @
Add Labour Cess @
Total cost for 10 sqm
Rate per 10 Sqm
Rate per 1 Sqm

66

0%
0%

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
10032.73
275.90

2F
10032.73
551.81

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

10308.63
1403.52
11712.15
0.00
0.00
11712.15
1171.22

10584.54
1441.09
12025.63
0.00
0.00
12025.63
1202.56

BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with plain white glazed wall tiles of any size and
of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 K
jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all m
Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, cur
item of work (for toilets)
A. MATERIALS:
Colour glazed tiles of 1st quality - BMT-C.06
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing -BMS-W.68
B. LABOUR
Mason Ist class

10.50 Sqm
0.12
cum
57.60
kgs
33.00
kgs
6.00
kgs

0.77
337269598.xlsx data-Bld-14-15

day

Page 1458 of 3205


Mazdoor (unskiled)

0.80

Add water charges 1%


Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

1.00%
14%
0%
0%

337269598.xlsx data-Bld-14-15

day

Page 1459 of 3205

67

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
5197.85
69.53

2F
5197.85
139.06

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

5267.38
717.15
5984.53
0.00
0.00
5984.53
598.45

5336.91
726.62
6063.53
0.00
0.00
6063.53
606.35

WATER PROOFING AND PAINTING


BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick w
of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyan
operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, ro
complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3
Water proof compound - BMT-H.01

0.210 Cum
2.000 Kg

B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

0.660 day
1.540 day
3.70 day

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

14%
0%
0%

Rate for other Floors


Basic rate per 10 Sqm
For Lift Charges of Labour, increase @ 10% on labour charges of
respective item for each upper floor on Ground Floor Rate - Add Area
Allowances as applicable on labour charges vide Pg.131 of Bld.Std.data

1F
3334.55
244.64

2F
3334.55
489.29

Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate per 1 Sqm

3579.19
487.31
4066.50
0.00
0.00
4066.50
406.65

3823.84
520.62
4344.46
0.00
0.00
4344.46
434.45

337269598.xlsx data-Bld-14-15

Page 1460 of 3205


68

BLD-CSTN-10-3-(126) ; Roofing with corrugated G.I sheets 1.25mm thick fixed with G.I J bolts & nuts 8 mm dia wi
white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of she
seigniorage charges, turnover tax etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance
Unit = 184.518 sqm
A. MATERIALS:
Plain or Corrugated Galvanized iron sheets as per IS 277 (0.1 mm to 0.8
mm thickness) - (BMT-E.20)

154.80 kgs

G.I scam bolts & nuts 2 x 27 (laps) x 17 = 884(BMS-W.62) Sl No.937 Pg


No.73
G.I J bolts 8 mm dia 2 x 5 x 27 sheets x 3 nos = 810 nos.(BMS-W.64) Sl
No.939 Pg No.73
Limpet washers (for scam & J bolts)
884 + 810 = 1694 (BMS-W.66)
Sl No.941 Pg No.74

47.91 nos

Bitumen washers (BMS-W.67) Sl No.942 Pg No.74


Zinc cromate yellow paint (BMT-J.04) Sl No-356 Pg 23
Ready mixed paint (BMT-J.28) Sl.No.380
B. LABOUR
For roofing
Carpenter II class
Man mazdoor (beldar)
For premier painting one coat
Painter
Mazdoor (coolie)
For two coats of painting to over laps
Painter
Mazdor (coolie)
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per 10 sqm = Grand Total/10

91.82 nos
0.14 litre
0.20 litre

43.90 nos
91.82 nos

0.84 day
0.91 day
0.06 day
0.06 day
0.14 day
0.14 day
14%
0%
0%

Rate per 1Sqm


69

BLD-CSTN-10-4-(127); Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nu
including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, trus
upto 600 pitch.
Unit = 216.14 sqm
A. MATERIALS:
6 mm thick corrugated AC sheets - BMT-E.17, Sl No.123 -Pg 16
8 mm dia G.I J bolts & nuts -BMS-W.62-Pg 73
G.I washers- BMS-W.65 - Sl No-925,Pg 73
Bitumen washers - BMS-W.67 - Pg 73
B. LABOUR
Carpenter II class
Man mazdoor
Sundries including 50 x 6 mm iron wind ties white lead etc.
Add for Standard specification 1mm. Thick ridging and 1.25 mm thick
sheet vallyes when such are required for a particular work. Average
allowance for 10 sqm roofing.
Grand Total
over heads & contractors profit

11.30 Sqm
22.03 nos
22.03 nos
22.03 nos
0.43 day
0.54 day
LS
LS

14%
337269598.xlsx data-Bld-14-15

Page 1461 of 3205


sub total
Add VAT @
Add Labour Cess @
Rate per 10 sqm = Grand Total/10

0%
0%
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

Page 1462 of 3205


70

BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Ex
surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charg
charges etc., complete for finished item of work.
Cement Primer Grade - II
1st class painter
2nd class painter

1.00 Kg
0.21 day
0.49 day

Sundries including brushes, ladders, etc.,

0.50%

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @
Total cost
Rate per 10 Sqm
71

14%
0%
0%

BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after thor
dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as
finished item of work, but excluding conveyance charges of materials
Whiting / White Cement - BMS-W.68
Gum, conjee water, or prickly pear juice including necessary fire wood

1.20 Kg
LS

Brick Layers / Painter ( Labour-Irri-Skilled-Sn.11)


Mazdoor (unskilled)

0.11 day
0.22 day

Sundries including brushes, ladders, etc.,

0.50%

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @
Total cost
Rate per 10 Sqm
72

14%
0%
0%

BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thor
dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as
finished item of work, but excluding conveyance charges of materials
Whiting / White Cement - BMS-W.68
Gum, conjee water, or prickly pear juice including necessary fire wood
Brick Layers / Painter
Mazdoor (unskilled)

2.00 Kg
LS
0.21 day
0.32 day

Sundries including brushes, ladders, etc.,


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Total cost
Rate per 10 Sqm

1%
14%
0%
0%

337269598.xlsx data-Bld-14-15

Page 1463 of 3205


73

BLD-CSTN-11-8-(164): Colour washing two coats with approved Colour and quality to give an even shade after tho
dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as
finished item of work, but excluding conveyance charges of materials
Rate as per White washing Two coats
Add 50% extra for colour etc
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

50%
14%
0%
0%

337269598.xlsx data-Bld-14-15

Page 1464 of 3205


74

BLD-CSTN-12-3-(170) ; Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint o
making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of
and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished
Cost of white wash one coat
Cost of Snowcem paint -BMT-J.26

1st class painter ( Labour-Irri-Skilled-Sn.35)


2nd class painter ( Labour-Irri- Semi Skilled-Sn.37)
Mazdoor (unskilled)
Add sundries including brushes etc @
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
75

14%
0%
0%

BLD-CSTN-11-10-(167) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of appro
appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the
loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental
item of work as per SS 911 for internal walls
PRIMARY COAT:
Cost of Oil bound Distemper Primer - BMT-J.01
Painter I st class
Pianter II nd class
Cost of washable Oil Bound Distemper -BMT-J.21
1st class painter
II class painter
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

76

2.00 Kg
0.09 day
0.21 day
1.50 day
1%

0.50 Kg
0.08 day
0.19 day
1.70 Kg
0.36 day
0.84 day
14%
0%
0%

BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood W
conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., comp
1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.

0.70 Ltr

1st Class Painter


2nd Class Painter
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

0.21 day.
0.49 day.

337269598.xlsx data-Bld-14-15

14%
0%
0%

Page 1465 of 3205


DOORS , WINDOWS AND VENTILATORS
77

Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through
the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with b
bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of h
with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as
Rate as per SSR Item No. 156,Pg 18 -BMT-F.29
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

78

1.00 Sqm
14%
0%
0%

BMT-F.30: Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm c
with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8m
height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, loc
accessories all fixtures and painted with one coat of approved steel primer etc., complete for finished item of work a
Rate as per SSR Item No. 157, Pg 18 -BMT-F.30
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

1 Sqm
14%
0%
0%

79

BMT-P.25; NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH
of windows made of pre-painted steel (Base steel as per IS 513 of 0.6mm thick galvanized as per IS 277 with Zin
primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 mi
frame should be of 48x50mm, centre mullion should be of 48x50mm, section for shutter should be of 47x20mm and
12x12mm. Outer frame and mullions to have rebate for Glazed shutter and a 20mm provision for Guard bars/Grills.
joined with corner bracket. Centre mullion is to be fixed with mullion cap. Seccolor Handle, seccolor stay, 2 nos. o
shall be provided per shutter. The windows should be panelled with 5mm thick plain float glass. Rubber Gaskets are
frames should be fixed to the concrete/masonry wall by means of self expanding screws, Including 10mm Square
complete for finished item of work.

Double shutter Window with vertical member 40 x 40 (1219.2mm x 1219.2mm) outer frame section size of
47x20mm and mullion section should be of 48x50mm.
Rate as per SSR Item No. 742 Pg 62 -BMT-P.25
over heads & contractors profit

1 Sqm
14%

sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm
b

0%
0%

Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section size of
47x20mm. Mullion section size of 48x50mm. Fixed beading section size of 12x12mm.
Rate as per SSR Item No. 743 Pg 62 -BMT-P.26
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

1 Sqm
14%
0%
0%

Page 1466 of 3205


80

NCL or Equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH GRILL & F
of windows made of pre-painted steel (Base Steel as per IS 513 of 0.6mm thick galvanized as per IS 277 with zin
primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 mi
frame should be of 72x55mm, centre mullion should be of 72x50mm, Section for fixed glass beading section shoul
should be of 47x20mm. Outer frame & mullion sections to have rebate for glazed shutters, fly mesh and a 20mm
shutter section should be of 20x40mm. The sections are to be cut to length metre joined with corner bracket. Centre
seccolor stay, seccolor handles, seccolor latch 2 Nos of heavy duty stainless steel pivot hinges shall be provid
panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter(304 grade). Rubber Gaskets are p
frames should be fixed to the concrete/masonry wall by means of self expanding screws. Including 10mm Squa
complete for finished item of work

Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section size of
47x20mm. Mullion section size of 72x50mm. Fixed beading section size of 12x12mm.
Rate as per SSR Item No. 748, Pg 63 -BMT-P.31
over heads & contractors profit

1 Sqm
14%

sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm
81

0%
0%

NCL or Equivalent Sliding Windows Providing and Fixing Sliding Window fabricated from Roll formed sec
coated/powder coated (Base Steel as per IS 513 D quality, galvanized as per IS 277 with zinc of 120 GM/Sq.mt
Primer coat with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick a
microns or powder coated with pure polyester powder up to 50-60 microns thick. Section for external frame botto
sides and top should be of 69x24mm, guide for top and bottom should be of 69x26mm (Stainless Steel). Section
windows should be panelled with 5mm thick plain float glass. Corner bracket for internal and external frame mad
made of Ethyl Propylene Diamine Monomer (EPDM).The sections are to be cut to length, joined and assembled
frames should be fixed to the concrete/masonry walls by means of self expanding brackets & screws including
(152.4mm) and all Taxes complete for finished item of work

Rate as per SSR Item No. 750, Pg 63 -BMT-P.33


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm
82

1 Sqm
14%
0%
0%

BMT-N.04: Providing and fixing 30mm thick RAJSHRI or Equivalent BRAND FACTORY MADE SOLID SING
SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, a
The MS. Frame shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5m
Prelam Pac C channel of size 30mmX50mm to form stiles.5mm thick& 75mm wide single side prelim Pac sheets
Panelling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed to the front (prelam side) stile
bent portion as beading) and attached to the back(white/ivory) stiles and rails which should have a 10mm 900 ben
wide X 5mm thick Pac sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be joined t
additional 5mm thick Pac strip of 20mm width to be stuck on the interior side of the C channel using Pac solvent ce
20mm wide cross Pac sheet to be fitted as gap insert for top and bottom rail etc. complete as per direction of Engin
and drawing

Rate as per SSR Item No.646, Pg 43 -BMT-N.04


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm
337269598.xlsx data-Bld-14-15

1 Sqm
14%
0%
0%

Page 1467 of 3205


83

BMT-N.31: Doors Frames (Colour Coated Steel Sections) & Shutter using Cement Bonded Particle Board as p
Providing and fixing of door frame made from cold roll formed sections made of galvanized (Base steel as per IS277
steel sections with total coated thickness of 1mm, primer coated with epoxy primer coat of 5-7 microns thick,
microns. The Section for door frame is to be filled with polyurethane (P.U) form of 40kg/m3. Overall size of frame s
necessary corner brackets, stiffeners, hinges, and screws. Cement Bonded particle board shutter (Bison Panel o
styles U section of size 12m x 18m x 12mm made from 0.6 mm thick galvanized, colour coated cold rolled steel
particle Board (Bison Panel or Equivalent) with necessary screws fixed at every 1-0 (304.8mm) intervals. The co
size 250mm long 2nos. 200mm long tower bolt 1no., 125mm handles 2nos., cost and conveyance of all materials
coat of luppum and two coats of synthetic enamel paint as per approved design

Rate as per SSR Item No.673, Pg 48 -BMT-N.31


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

337269598.xlsx data-Bld-14-15

1 Sqm
14%
0%
0%

Page 1468 of 3205


79

BMT-N.58 : Providing and fixing door frames fabricated from sections made of galvanized steel powder coated (ba
IS 277 with zinc of 120 grams / square metre), the factory made section are powder coated with pure polyester
coated thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodat
insert gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of w
thick MS powder coated butt hinges of 100 mm long 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRC
each vertical. c) 40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners 6 Nos. with split end tail. d) Nylon
frame. e)Tie Rod 1 No

Rate as per SSR Item No.714, Pg 59 -BMT-N.58


over heads & contractors profit

1 Rmt
14%
Sub Total

Add VAT @
Add Labour Cess @
Total

0%
0%
Rate per 1 Sqm

80

BMT-P.80 : Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel (Base Steel as pe
277 with Zinc of 120 GSM), using factory made section powder coated with Pure polyester powder upto 50-60
of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks w
and without grill provision is of 75 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and t
tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water dra
shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal re
Alumimium 1 No. per each shutter and cut to length miter joined with corner brackets including installatio
fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories,
complete finished item of work.

Window with Two Sliding Shutters and with Grill Outer Frame Size 90 mm
x 50 mm have a rebate of 15mm x 5 mm to fit grill made of 10mm MS Sq
Rods for horizontal bars welded at a regular pitch of 150mm to 12mm x 6
mm MS flat. BMT-P.82 - S.N.746 - Pg- 67
over heads & contractors profit
Rate per 1 Sqm
81

14%

BMT-P.103: Providing and fixing of top hung Ventilators made of pre- painted steel (Base steel as per IS 5
per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and secti
centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to
provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion
grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provid
mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by mean
10 mm Square guard bars with 6 (152.4mm) pitch etc., complete for finished item of work.

Double fixed Louvers ventilator Size of 4 0 x 2 0 (1219.2mm x


609.6mm) outer frame box section size of 80 x 45mm, vertical mullion
section size of 80 x 60 mm. BMT-P.103 - S.N.746 - Pg- 67
over heads & contractors profit
Rate per 1 Sqm
82

1 Sqm

1 Sqm

14%

BMT-N.30: upply and fixing of BISON LAM double door shutter using 16MM BISONLAM with all round U sect
from 0.6mm thick galvanized pre-painted cold rolled steel profiles with BISON LAM separating two shutter with 30m
necessary screws fixed at every 10 (304.8mm) intervals. The cost inclusive of MS Nickel coated 250mm long aldro
grip handle, 2 nos M.S.P.C. Door stopper. Including cost and conveyance of all materials at site labour charges etc.

Rate as per SSR Item No.686, Pg 53 -BMT-N.30


337269598.xlsx data-Bld-14-15

1 Sqm

Page 1469 of 3205


over heads & contractors profit

14%
Sub Total

Add VAT @
Add Labour Cess @
Rate per 1 Sqm

0%
0%

337269598.xlsx data-Bld-14-15

Page 1470 of 3205


83

BMT-N.29 : Supply and fixing of BISON LAM single door shutter using 16MM BISONLAM with all round section U
cold rolled steel profiles BISON LAM with necessary screws fixed at every 10 ( 304.8mm) intervals. The cost inc
aldrops 2 nos , MS powder coated 250mm long tower bolt 1 nos, 2nos MS powdercoated 125mm long gr
Including cost and conveyance of all materials at site labour charges etc., complete finished item of work.
Rate as per SSR Item No.686, Pg 53 -BMT-N.29
over heads & contractors profit

1 Sqm
14%
Sub Total

Add VAT @
Add Labour Cess @
Rate per 1 Sqm
84

0%
0%

BMT-N.22 : Supply and Fixing Flush door shutters, solid bond wood block board type with teak veneer on one
(lipping): 35 mmthick conforming to IS:2202, fitted with 1no. 300 mm long MS Aldrop, 2 nos. 125 mm lond Alu
Aluminium tower bolt, 1 no. 250 mm long Aluminium door latch & 1 No.Aluminium door stopper including cost and
etc, complete.
BMT-N.22 :35 mmthick Flush door shutters, solid bond wood block board
type-

1 Sqm

BMM-V.23 : Labour charges for fixing Flush door shutters of any thickness
to the existing door frame including fixing the fixtures to the door shutter
excluding cost of shutter.

1 Sqm

Add Municipal allowence on labour charges


MS-Powder Coated Aldrop- 300 mm long - BMT-G.45
Aluminium Door Handles (IS:208)150 mm Long - BMT-G.34

20%
1 No.
2 No.

Aluminium Tower Bolt-10 mm Bolt (IS:204) 250 mm Long - BMT-G.10

1 No.

Aluminium Flat Latches: 250 mm long - BMT-G.49

1 No.
1 No.

Heavy duty Aluminium Door stopper - BMT-G.57

over heads & contractors profit

14%
Sub Total

Add VAT @
Add Labour Cess @
Rate per 1 Sqm
84

0%
0%

BMT-N.77: Supply & Fixing of Powder Coated Mild Steel doors, frames & shutters made of Skin pass gal
Steel as per IS 513 D Quality, Galvanized as per IS 277 with Hot Zinc Coating of 120 grams / Sq.Mtr wit
Microns, frame with 1.2mm thick Skin pass Galvanized Iron sheet formed to single rebate profile of size 1
Polyurethane foam, the Door Shutters are with 0.80 mm thick Skin pass Galvanized Iron Sheet formed
double skin door shell with Lock Seam joints at stile edges, fitted with in-fill of Honeycomb Kraft Paper
Pure polyester/ epoxy polyester or polyurethane powder for powder coating of thickness 60 65 micron
Primer to receive any paint on site or finished with Thermosetting Polyurethane paint of Aliphatic Grad
resistance and durability, the Shutter provided with 6 MM clear float vision glass in Circular, Square or Rec
Bearing Butt Hinges 3 mm thick fixed flush to the frame and shutter (Profile 102x76x3mm thick).Mortis
Mortise Dead Bolt, etc for industrial, commercial, residential, clean room applications

Rate as per SSR Item No..., Pg . -BMT-N.77


over heads & contractors profit

1 Sqm
14%
Sub Total

Add VAT @
Add Labour Cess @
Rate per 1 Sqm

0%
0%

337269598.xlsx data-Bld-14-15

Page 1471 of 3205


85

Designing, providing and fixing Structural Glazing fabricated from Roll formed sections made of Pre-painted Steel /
of D quality, galvanized as per IS 277 with Zinc of 120 Gm/Sqm) with total coated thickness of 0.72 mm and the
stainless steel of 0.58 mm thick galvanised steel section as stiffeners inside the colour coated steel po
requirement & calculations to suit wind pressures as given in IS: 875, the primer coat with epoxy primer of 5 7 mi
paint of 12-16 microns thick and back coated with Alkyd backer of 5-7 microns or powder coated with pure polyes
the vertical section of 50 mm x 100 mm x 0.72 mm, 33 mm x 58 mm x 0.72 mm for frame horizontal section, stiff
cover profiles sections of 20 mm x 58 mm x 0.58 mm, glass holding section of 37 mm x 37 mm & 37 mm x 18 m
reflective glass, brackets made of CRCA powder coated/Electroplated to connect vertical to horizontal, vertical to s
site requirement and gasket made of Ethyl Propylene Diamine Monomer, U.V. resistant silicon sealant including
expanding cap & screws inclusive of cost and conveyance of all materials to site, all labour charges, incidental cha
scaffolding charges, form work etc. complete for finished item of work.

Rate as per SSR Item No.881,-BMT-Q.01


over heads & contractors profit

1 Sqm
14%
Sub Total

Add VAT @
Add Labour Cess @
Rate per 1 Sqm
86

0%
0%

BMS-W.16; Supply, delivery and fixing of 50mm thick Cement Jali of size 0.90x0.45 m for Ventilator including all labo
Cost of 50 mm thick Cement Jali -SSR Item No.892, Pg 84 - BMS-W.17
over heads & contractors profit
Rate per 1 Sqm

87

14%

BMS-W.19: Supplying and fixing of 7.5mm thick Aluminium Grill (as approved by the department) 3.58 Kg/Sqm.inc
and all labour charges etc, complete.
Cost of 7.5mm thick Aluminium Grill -SSR Item - BMS-W.19
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

88

1 Sqm
14%
0%
0%

Providing and fixing Aluminium Extruded Section Body Tubular Type Hydraulic Door Closer (IS: 3564) with d
accessories and screws etc. complete (Type-3: for width of doors 851 to 1000 mm)
Basic cost -SSR Item No.892, Pg 84 - BMT-G.76
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 No.

89

1 Sqm

1 No
14%
0%
0%

BMT-M.77: Supply and fixing of BISON LAM aluminum glazed partitions using 10MM BISONLAM and 5.50 mm
BISON LAM to a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections ano
of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly fixed with clip beading on both si
M.S. flats, bolts and nuts including cost and conveyance of all materials etc., complete as directed during execution
Basic cost -SSR Item No.635, Pg 46 - BMT-M-77
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 No.

1 No
14%
0%
0%

337269598.xlsx data-Bld-14-15

Page 1472 of 3205

337269598.xlsx data-Bld-14-15

Page 1473 of 3205


90

BMT-M.94: NCL or equivalent Partitions: Supply and fixing of partitions made of seccolor pre-painted steel (base
quality, galvanized as per IS 277 with Zinc of 120 GSM). Primer coated with epoxy primer of 5-7 microns thick, fini
microns thick alkyd backer. Section for outer frame should be 46x52mm, section for shutter should be 46x46mm,
section for beading should be 18x25mm and section for middle and bottom rail (Lock Rail and Kick Rail) of s
should be paneled with 9mm pre- laminated particle board to a height of 0.91m from the bottom, and remaining he
Propylene Diamine Monomer (EPDM) Gaskets. The sections are to be cut to length, mitre joined with corner brac
mullion cap. Gaskets made of Ethyl Propylene Diamine Monomer (EPDM). Corner brackets made of CRCA with
Glass filled nylon. The above frames should be fixed to the concrete/masonry wall by means of self expanding
work.

Fixed Partition with Door: Outer frame section size of 46x52mm, mullion section should be of 46x70mm, fixed be
shutter should be of 46x46mm and section for middle & bottom should be of size 23x130mm
Basic cost -SSR Item No.652, Pg 49 - BMT-M-94
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 No.
91

1 No
14%
0%
0%

BLD-CSTN-10-32-(155) : Supplying and fixing Gyp Board Fine Line Grid false ceiling (GS-FLC-4.6 as per India G
12.5 mm thick/ 9.5 mm thick Gyp Board sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm conform
precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to
suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c
steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring stee
system at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm Gypboard Sheet tiles of size 595 mm x 595 mm or 595 m
drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification.

UNIT 1 sqm
A) Material requirement
12.5 mm / 9.5 mm - Gypboard Tiles - Either - 595 mm x 595 mm -Or - 595
mm x 1195 mm - (BMT-M.01) S.No.559, Pg-39

1.00 sqm

GI Angle - Precoated -25 mm x 25 mm x 0.7 mm -BMT-M.08 - S.No.566.


Pg-39
GI - Precoated - T Section - 3600 mm long 24 mm x 38 mm x 0.7 mm
thick -BMT-M.10 - s.No.568-Pg-39
GI - Precoated - T Section - 600 mm long - 24 mm x 38 mm x 0.7 mm
thick
GI Rod - 4 mm Dia -Connecting Rod - BMT-M.26 -S.No. 484-Pg-39

0.40 RM

Rawl Plug - BMT-M.18- S.No.576- Pg-39


Soffit Cleats- BMT-M.20- S.No.578- Pg-39
Unversal Holding Clips - BMT-M.25- S.No.583- Pg-39
Drywall Top Coat -BMT-M.24- S.No.582- Pg-39
B) LABOUR CHARGES
1st Class Carpenter ( Labour-Irrigation-Skilled-S.N-4)
2nd Class Carpenter
1st Class Painter
2nd Class Painter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges ( 1014-BMC-X.02-Pg
104)

1.28 Nos
1.28 Nos
5.36 Nos
0.15 lits

337269598.xlsx data-Bld-14-15

1.60 RM
1.60 RM
1.28 RM

0.40 day
0.40 day
0.08 day
0.08 day
0.04 day
0.04 day
0.24 day
0.32 Hrs

Page 1474 of 3205


Power Drill - Hand Operated - Hire Charges (1015 -BMC-X.03 - Pg 104)

Scaffolding charges
BASIC COST per 1 sqm
over heads & contractors profit

0.32 Hrs

1%
14%
Sub Total

Add VAT @
Add Labour Cess @
Grand Total
Rate per 1 sqm

0%
0%

337269598.xlsx data-Bld-14-15

Page 1475 of 3205


92

BLD-CSTN-10-33-(156): Providing and fixing in true horizontal level 600 mm x 600 mm 15 mm thick Arm strong
Arm strong world Industries using hot dipped Galvanised Steel section exposed surface with pre-coated capping, m
mm c/c maximum and rotary stiched cross tee of size 24 x 27 mm at evry 600 mm c/c and sub-cross tee of size 2
angle of size 19 x 19 mm fixed to periphery of the wall and the above grid is suspended at every 1200 mm c/c i
straightened GI Wire laying fine fissured butt edge ceiling tiles of 15 mm thick mineral fiber Board manufactured
having RH 99% and for finished of size 600 x 600 mm including Cost &conveyance of all materials and labour cha
frame work exposing roof making complete for finished item of work.

UNIT 1 sqm
A) Material requirement
15 mm - Armstrong Mineral Fiber sheet 600 x 600, BMT-M.29 ,Sl No-587,
Pg No 40
Hot dipped GI Angle - Precoated - Grid -19 mm x 19 mm -BMT-M.11, Sl
No 569, Pg 39
Polyster painted GI - T Section - 1200 mm - (1) 24 x 32 mm and (2) 24 x
25 mm (sub-cross Tee) - BMT-M.12
Polyster painted GI - T Section - 300 mm-BMT-M.14 - 24 mm x 27 mm
GI Rod - prestraightened - 2.0 mm dia
Connecting Rod - BMT-M.27,Sl No 585, Pg No 39
6 mm Nylon Rawl Plug -BMT-M.19-Sl No 577, Pg No 39
B) LABOUR CHARGES
PER UNIT 1 sqm
1st Class Carpenter
2nd Class Carpenter
1st Class Painter
2nd Class Painter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges ( 1014-BMC-X.02-Pg
104)
Power Drill - Hand Operated - Hire Charges (1015 -BMC-X.03 - Pg 104)

Scaffolding charges
BASIC COST per 1 sqm
over heads & contractors profit

1.00 sqm
0.40 RM
1.60 RM
1.60 RM

1.28 RM
1.28 Nos

0.40 day
0.40 day
0.08 day
0.08 day
0.04 day
0.04 day
0.24 day
0.32 Hrs
0.32 Hrs

1%
14%
Sub Total

Add VAT @
Add Labour Cess @
Grand Total
Rate per 1 sqm

0%
0%

337269598.xlsx data-Bld-14-15

Page 1476 of 3205


93

BLD-CSTN-10-34-(157): Providing and fixing Thermocole False ceiling in true horizontal level 600 mm x 600 mm
sheet anodised Aluminium Tee sections of size 24.50 mm x 24.0 mm x 2.4 mm in grid with cross tee of size 24 x 24
aluminium wall angle of size 24 x 24 mm fixed to periphery of the wall and the above grid is suspended at every 120
thick GI Wire for finished of size 600 x 600 mm including Cost &conveyance of all materials and labour charges su
work exposing roof making complete for finished item of work
UNIT 1 sqm
A) Material requirement
19 mm Thermocole sheet 600 x 600 (Sl No.596-BMT-M.38-Pg 41)
Alumninium Angle 24mm x24mm (573-BMT-M.15-Pg 39 )
Anodised Aluminium T Section (1) 24 x 24.5 x 2.4 mm mm 574-BMTM.16-Pg 39 )
GI Rod - prestraightened - 2.0 mm dia Connecting Rod (585 -BMT-M.27Pg 40)
Rawl Plugs (576-BMT-M.18-Pg 39)
B) LABOUR CHARGES
1st Class Carpenter ( Labour-Irrigation-Skilled-S.N-4)
2nd Class Carpenter
1st Class Painter
2nd Class Painter
Power Saw Cutter - Hand Operated - Operator (Labour- R&B-Semi
skilled-S.No.55)
Power Drill - Hand Operated - Operator (Labour- R&B-61)
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges ( 1014-BMC-X.02-Pg
104)
Power Drill - Hand Operated - Hire Charges (1015 -BMC-X.03 - Pg 104)

Scaffolding charges
BASIC COST per 1 sqm
over heads & contractors profit
Grand Total
Rate per 1 sqm
94

1.00 sqm
0.40 RM
3.20 RM
1.28 Nos
1.28 Nos
0.36 day
0.36 day
0.00 day
0.00 day
0.02 day
0.04 day
0.20 day
0.16 Hrs
0.32 Hrs

1%
14%

BMT-M.73: Supply and fixing BISONPANEL(IS 14276) wall paneling using 10 MM BISONPANEL with frame work
35mm x 0.55mm thick placed at every 610 mm C/C intervals vertically and at 1200mm internals horizontally fixe
screws and caps. BISONPANEL is to be fixed to frame by means of self taping screws placed at every 300 mm
panels. The cost inclusive of one coat of Altek primer and two coats of Altek smooth finish and cost & convey
complete as per the direction of Engineer in charge.
Basic rate as per S.N.631, Pg.No,44 of BSSR
over heads & contractors profit

1.00 Sqm
0.14
Sub Total

Add VAT @
Add Labour Cess @
Total
Rate per 1 Sqm
95

0%
0%

Observed dataSupply,
fabrication
and
in position
MS Purlines
cost and conveyance1ofRmt
all material and all labour
Weight of
40mm dia
MSfixing
Structural
Pipe-ofMedium
class including
as per IS-1161
add 5% for wastage
Total weight
Cost of Mild Steel Tubes & pipes of all diameters as per IS-1161-BMTF.04-Sl No-130 and Pg 17
outer dia of 40mm dia MS pipe = 48.3mm
337269598.xlsx data-Bld-14-15

3.74 Kg
r
2
6.290 0.024

Page 1477 of 3205


Painting with Synthetic enamil paint (2Pi rl)
Labour charges for fixing @ 30%
Rate per 1 Rmt

337269598.xlsx data-Bld-14-15

0.15 Sqm

Page 1478 of 3205


96

Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars ho
vertically at 30cm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cu
original surface neatly and painting grill with one coat of red oxide primer including and conveyance of all materi
operational charges and all labour charges etc., complete for finished item of work.
For MS Grill

1.50 x

Quantity Anailysis
25mm x 6mm MS flat alround @ 1.20 Kg/Rmt
Vertical Flat
Horizontal Flat
Z Holdfasts

2 Nos
2 Nos
4 Nos

1.50
1.50
0.45

8.00 Rmt
10mm M.S square bars @ 0.78 kg /Rmt
Vertical bars
Horizontal bars

5 Nos
12 Nos

1.50
1.50

26.00 Rmt
Cost Analysis
Cost of 25X 6mm MS Flat
Cost of 10mm MS squre bars
Labour charges for fabricating steel and fixing in position as per SSR
Item No.BMM-V.14-824
Add Municipal allowence on labour charges
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position- BMM-V.15-825.Pg- 68

9.60 Kgs
20.28 Kgs
29.88 Kgs
20%
29.88 Kgs
20%

Add Municipal allowence on labour charges


Rate per 29.88 Kgs
Rate per 1 Sqm
Rate per 1 Kg
97

Supply and fixing of 40 mm thick polished black Kadapa stone for platform including labourcharges for lifting and fix
Kadapa slab 40 mm thick and size not less than 0.457 M x 0.457 M (BMTB.01) item 22 Pg 11

1.05 Sqm

Rounding the edges of Kadapa / Shahabad stone slabs of any thickness


including polishing the same (BMM-V.09) item 860 Pg 82 (0.75 Mts wide
plot farm)

1.34 Rmt

Labour charges for lifting & fixing in position @

20%

over heads & contractors profit

14%
Rate per 1 Sqm

98

BLD-CSTN-15-5-(307): Providing and fixing 1.80 metre long MS fencing posts with 6 mm bar nibs as per design in p
be paid for separately)
Details of cost for 10 pipes 12.5 cm long day i.e., 1.25 metres
Materials:
Galvanised mild steel tube (light grade) 40 mm nominal bore 10 x 12.5 cm
= 1.25 metre with wastage of 5% (BMW-F.75)
Labour :For cutting and fixing in position
Assistant fitter
Mason.
Mazdoor (male).

1.310 m

0.100 day
0.400 day
0.400 day
337269598.xlsx data-Bld-14-15

Page 1479 of 3205


Sundries
Add for water charges @ 1 %
Cost for 1.25 m
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Cost for 1.25 m
Cost per m

14%
0%
0%

Rate per 10 Sqm

337269598.xlsx data-Bld-14-15

Page 1480 of 3205


99

Observed data- Supply, fabrication and fixing in position of MS Purlines including cost and conveyance of all materi
Weight of 40mm dia MS Structural Pipe- Medium class as per IS-1161
add 5% for wastage
Total weight
Cost of Mild Steel Tubes & pipes of all diameters as per IS-1161-BMTF.04-Sl No-130 and Pg 17

3.74 Kg
r
2
6.290 0.024
0.15 Sqm

outer dia of 40mm dia MS pipe = 48.3mm


Painting with Synthetic enamil paint (2Pi rl)
Labour charges for fixing @ 30%
Rate per 1 Rmt
100

1 Rmt

Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long cold twisted deformed steel Anchor ro
drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials, machinary
Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.
Unit - 10 Nos

16 mm dia

A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 1.50m length

23.70 Kg

Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141 Pg No.


19

10 Nos

Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg No. 19

10 Nos

B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Rate per 10 Nos
Rate per 1 Nos

0.50 day
0.50 day
1.00 day

Rate per Each

101

BLD-CSTN-15-7 (307); Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38
fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild steel wi
(Posts and struts of wood, concrete, steel, etc.) and straining bolts shall be paid for separately).
Details of Cost per 100 metres (day line of wire)
Materials:
Galvanised steel barbed wire IS type I weighing 9.38 Kg/100 metre -M063, Pg-245
Carriage of barbed wire.
G.I. staples steel pins or binding wire @10%
Labour :For fixing & stretching wire
Blacksmith, 1st Class
Blacksmith, 2nd Class
Mazdoor (male).
Sundries.
Add water charges @ 1 %
over heads & contractors profit
sub total
Add VAT @

9.380 Rmt

0.150 No
0.150 No
0.300 No

14%
0%
337269598.xlsx data-Bld-14-15

Page 1481 of 3205


Add Labour Cess @

0%

Cost for 100 metres day line of wire


Rate per m

Rate per 1Rmt

337269598.xlsx data-Bld-14-15

Page 1482 of 3205


Observed Data
102

103

Fixing MS angular sections of 1.20 m length of size 50mm x 50mm x 6mm confirming to IS 226 and IS 808 as direc
placing in position in the concrete for the purpose of fixing barbed wire fencing and painting the angles with two co
cost and conveyance of all materials, labour charges etc., complete at the top of the compound wall after raising the
weight of MS angular section of 50x50x6mm

4.50 Kg

Labour charges for fabricating steel and fixing in position as per SSR
Item No.BMM-V.14-824 & BMM-V.15-825.Pg- 68

4.50 Kg

Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position
Add two coats synthetic anamel painting charges
Area for 1 No., of MS angle of 1.05m length for both sides
Size of angle 50x50x6mm
Area = 1.05 x 0.112 =
Say
Total cost for each angular including fixing

4.50 Kg

BMM-V.16: Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and Gird
charges, etc excluding cost of fixing in position
Rate as per item No.867 of Pg No.62 -2011-12
1 Kg
Add Labour component @
20%
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Kg

104

105

14%
0%
0%

BMM-V.17: Labour charges for fixing heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting in
blocks, Derek pole arrangements and cranes etc., complete in position
Rate as per item No.868 of Pg No.62 -2010-11
Add Labour component @

1 Kg
20%

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @
Rate per 1 Kg

14%
0%
0%

Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour ch
etc,. Complete.
Cost of Mild Steel, structural steel, i.e. Angles,channels and "I" sections
1 Kg
Transportation of material for 20.00Km lead
1 Kg
Labour charges for fabrication
1 Kg
Labour charges for fixing
1 Kg
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Kg

106

0.1176 Sqmt
0.12 Sqmt

14%
0%
0%

Supply and Fixing in position of Stainless steel sections including cost and conveyance of all material , labour ch
etc,. Complete.

337269598.xlsx data-Bld-14-15

Page 1483 of 3205


Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes &
diameters for - 304 Grade - BMT-F.06- S.No.134, Pg.No.20

1 Kg

Labour charges for Fabrication of stainless steel railing works using


stainless steel welding rods including buffing, polishing, lacquer finishing,
to present seamless finish - BMM-V.18- S.No.884, Pg.No.85

1 Kg

Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position - BMM-V.15- S.No.881, Pg.No.85

1 Kg

over heads & contractors profit


Rate per 1 Kg

14%

337269598.xlsx data-Bld-14-15

Page 1484 of 3205


107

Manufacture, Supply , Delivary and fixing of MS Door frame made with T angle of size 40x40x6 mm with 1
with 3 nos. 125 mm Butt hings welded to the frame and 6 Nos. MS Z hold fasts with 20x5 mm MS Flat 200 m
labour chrges, fabrication, welding etc., complete
Door size 3'-0"x 6'-9"
T angle for Door frame @ 3.5 Kg/Rmt
6 nos.MS hold fasts with 20x5 mm Flat
weight of 10 sq mm tie rods 2 Nos

0.90
2.05
5.90 Rmt @
1.38 Rmt @
1.80 Rmt @

Cost of T angle & 10 mm Sq. rod for Door Frame


cost of 3 Nos. 125 mm long butt hinges( Sl No.185)
Labour charges for farication works
Labour charges for fixing works

108

Supply and fixing of 30 mm thick Flush Door shutter solid bond wood block board type with commercial p
Aldrop, 2 nos. 125 mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch 1 No. door s
including c/c of all materials and labour chrges etc., complete
Door size : 3'- 0" X 6-9"
Shutter size for the T angle door frame
cost of flush door shutter 30 mm thick (SSR No.658) - BMT-N.16
Aldrop of 300 mm long (BSSR.Sl. No.203) - BMT-G.45
Door handle of 125 mm long (BSSR Sl. No.191) - BMT-G.35
Tower bolt of 150 mm long (BSSR Sl.No.166) -BMT-G.08
Door latch of 250 mm long (BSSR Sl No.207) - BMT-G.49
Labour charges for door shutter

109

23.13
3
23.13
23.13

0.90

2.05

1.845
1.00
2.00
1.00
1.00
1.845

Sqmt
No.
No.
No.
No.
Sqmt

Supply and fixing of Steel Glazed Window with double openable on both sides centrally fixed post and MS Win
clips with other fittings and their fixtures including supplying and fixing of 10 mm square bars @ 10cm c/c as per a
of all materials and labour charges including 4mm thick pin headed glass and approved fixtures like MS Z shaped
for finishing item of work complete as directed by the department .

MS Window Section - E Z 7
for Outer Frame:
Horizantals
verticals
holdfasts

H
1.20

V
1.20

2 Nos
2 Nos
4 Nos

1.20
1.20
0.20

Inner frame for shutters:


Horizantals
verticals

4 Nos
4 Nos

0.60
1.20
Total

c
d
e

FRB section
for central (Mullion) MS Tee 30 x 30 x 3
10 sq. mm saftety rods @ 100mm C/C
4 mm thick Pin headed Glass

Weight of " Z " Angles -T1 =1.03 Kgs/m (steel India )

12.80 Rmt

b
c

MS Tee for Central Mullian -235x25x3 @ 1.15 Kg/Rmt


10 sq. mm saftety rods @ 0.78 Kg/Rmt
ABSTRACT

1.20 Rmt
14.40 Rmt

337269598.xlsx data-Bld-14-15

1 Nos
12 Nos
1.20

1.20
1.20
1.20

Page 1485 of 3205


a
b
c
d
e
f
g

cost of Mild steel and structural steel


10mm Sq. Bars
window shutter lock handle with hinges 100mm (192) - BMT-G.35
Cost of 4 mm thick Pin headed Glass - BMT-I.13- (SSR No.344)
Labour charges for fixing of glass & cost of putty
Labour charges for fabricating steel works like Windows excluding cost of
fixing
in charges
position for fixing Iron Doors, Iron Windows and Window Grills in
Labour
position

337269598.xlsx data-Bld-14-15

14.60 Kg
11.20 Kg
2 No.
1.44 1.44
1.44 sqmt
25.80 Kg
25.80 Kg

Page 1486 of 3205


110

Supply & Fixing of MS "L" Angle 25X25X3 mm door frames (W.C.) with 2 Nos. of 125mm long hinges and
bonded particle boards confirming to IS 14276 truly exterior grade (Bison panel or equivalent ) including cost an
charges etc., complete for Bathroom doors as directed by the Engineer-in-charge.
"L" Angle WC Door Size .
"L" Angle for Door frame .
6 nos.MS hold fasts with 20x5 mm Flat
"L" Angle for Hold fast 4 Nos of 0.23m
Weight of 'L' for Door Frame @1.10Kg/ Rmt
Cost of 'L' Angle Door Frame with hold fasts
Labour charges for Fabrication Works (140)
Labour charges for Fixing (141)
Shutter Size 2'-6" X 6'-0"
Cost of plain cement bonded particle boards confirming to IS 14276 truly
exterior grade (Bison Panel or equivalent) SSR No. 491 - BMT-K.88
Cost of 2 Nos. Hinges 125 mm long (186) - BMT-G.29
Tower bolt of 150 mm long (BSSR Sl.No.172) -BMT-G.15
Labour Charges for fixing Door including cost of screws and
transportation etc.

111

0.75
5.60
1.38
0.92
7.90
7.90
8.69
8.69
8.69

2.05
1.20 Rmt@
Rmt
Rmt
Kg
Kg
Kg

1.5375

Sqm

2.00
2.00
1.54

Nos
Nos
Sqm

BMW-G.01: Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer a
and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fitting
Basic rate as per S.No.335 of Pg.No.99 - BMW-G.01
BMW-G.02-labour charges @
Total
Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @

1.00 Lit
40%

0%
0%
Rate per 1 Lit

337269598.xlsx data-Bld-14-15

Page 1487 of 3205


112

Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal
2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre includi
on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate w
cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding includ
charges etc., complete for finished item of work.
For MS Gate
Quantity Anailysis
45 x 45 x 6mm MS equal angle alround @ 4.00 Kg/Rmt
Vertical Angle (1.50+2.0)
Horizontal Angle
Z Holdfasts

35x35x5mm MS equal Horizontal Angle@2.60Kg/Rmt

12mm M.S square bars @ 1.13 kg /Rmt

1.75 x

2 Nos
2 Nos
4 Nos

1.75
1.50
0.45

9.00 Rmt
2 Nos
1.50
3.00 Rmt
Total Angles Qty
Vertical bars

Total Square Bars Qty


MS Sheet of 2.00mm (14G) for Bottom portion @ 15.70 Kg/ 1 Sqm

Cost Analysis
Cost of Equal angles
Cost of 12mm MS squre bars
Cost of MS sheet
Labour charges for fabricating steel and fixing in position as per SSR
Item
No.BMM-V.14-824
Labour
charges for fixing Iron Doors, Iron Windows and Window Grills in
positionBMM-V.15-825.PgPainting with
Synthetic enamil68
paint
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long -BMTG-18
MS-Powder Coated Aldrop (IS:2681) 300 mm long -BMT-G.45
Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @

12 Nos

21.00 Rmt
1.50
0.45 Sqm

43.80 Kgs
23.73 Kgs
7.07 Kgs
74.60 Kgs
74.60 Kgs
2.63 Sqm
1 No
1 No

0%
0%
Rate per2.625 Sqm
Rate per 1 Sqm
Rate per 74.595 Kg
Rate per 1 Kg

337269598.xlsx data-Bld-14-15

1.75

0.30

Page 1488 of 3205


113

Supply and Fixing in position of steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows etc, inc
, labour charges for fabrication and fixing in postion etc,. Complete.
1 Kg
Cost of Mild Steel, structural steel, i.e. Angles,channels and "I" sections
Transportation of material for 20.00Km lead
Labour charges for fabrication
Labour charges for fixing
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Kg

117

1 Kg
1 Kg
1 Kg
14%
0%
0%

Supply, delivery and fixing of 110mm dia PVC vent pipe including vent cowl, cost of material and labour charges e
for 15m height above GL
Cost of 110mm dia PVC Pipe.of 3.00 Mts length BSSR Item No.347,Pg99 - BMW-G.13
Rate for 15 Rmt PVC pipe
Rate for vent cowl SSR item 434,Pg-102 - BMW-G.100
PVC Pipe clip SSR item 440 Pg-102 - BMW-G.106
Labour charges for laying, fixing and commissioning the PVC pipes
including couplers/ bends/ tees etc any diameter including fixing
necessary fittings like bends, plugs, couplers, junctions, tees, etc with
solvent jointing as per standard practice, as per item No.486 of Pg,104BMW-G.152
Add Labour component @
Rate for 15 Rmt PVC pipe
Rate for 1 Rmt
Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @

1 No
15 Rmt
1 No
10 No
15 Rmt

20%

0%
0%
Total per 1 Rmt

118

RBR-CCPV-13 - i : Providing and Laying of Interlocking Concrete Block Pavements using PHOENIX or equ
interlocking Regular Pavers of 80 mm thickness of M- 30 Grade of which top 12 mm thick shall be for colour pigm
cement to get required reflective glazing inclusive of all taxes - as per drawing and Technical Specification Clause 15
Unit = sqm
Taking output = 225 sqm
a)Labour
Mate
Mazdoor (Unskilled)
Mason (2nd class)
b) Machinery
Water tanker 6 kl capacity
c) Material
Supply of PHOENIX or equivalent - BMT-D.10, Sl.No.100 of Pg.No.16
(ii) Edge blocks 60 mx2
(iii) Sand as per Table 1500.5
Bed = 603x75x 0.03 = 6.75 cum
Joints = 60x0.08
= 0.48 cum
(iv) Water for wetting of bedding sand
d&e) Overheads & Contractors Profit
Sub Total
337269598.xlsx data-Bld-14-15

- day
18.00 day
8.00 day
2.00 hour
225.00 sqm
120.00 m
7.23 cum

3.00 kl
14%

Page 1489 of 3205


Add VAT @
Add Labour Cess @
Cost for 225 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/225

0%
0%

337269598.xlsx data-Bld-14-15

Page 1490 of 3205

2. Edge blocks may be cast-in-situ. Brick masonry toe wall or CC block 300 mm x 300 mm x 150 mm or any oth
shall be analysed/included accordingly
Cost of CC 1:2:4 as per Bld. Data, without CP
size of Edge Block 500 mm x 300 mm x 150 mm
Qty of each block of1.00 m length
Overheads & Contractors Profit
Sub Total
Add VAT @
Add Labour Cess @
Rate for 1 Rmt
119

1 Cum
0.045 Cum
14%
0%
0%

Supply and fixing of precast RCC Door Frame of size(0.98X1.98mt) using flush type Door with 30mm thick flush
Type faced on both the sides with Commercial type plywood including cost of necessary fittings like hinges, towe
labour charges completed for finished item of work as directed by Engineering Incharges.
R.C.C.Door
R.C.C.Door Frame (0.98X1.98) As per Nirmithi Kendra Specifications
Flush door shutters, solid bond wood block board type with commercial
ply on both faces.: 30 mm thick conforming to IS:2202-t BMT.N.16
MS Powder Coated Hinges125mm (MS) BMT.G.29
30mm Screws No.8 Ele.1.4.36
Aluminium Tower Bolts size 150 mm long BMT.G.08
12mm Screws No.8 Ele.1.4.34
Aluminium Door Handile 150mm long BMT.G.34
12mm Screws No.8 Ele.1.4.34
Aluminium All Drops 300 mm long BMT-G.42
50mm dia 5cm Bolt and Nuts with washers for alldrop.Ele.8.1.12
Sal Wooden Pieces size 6"x2"X1.25"- 4 Nos. BMT-E..15

0.98m

1.98m
1.00 Nos.
1.488 Sqmt
2.00 Nos.
16.00 Nos.
2.00 Nos.
16.00 Nos.
1.00 Nos.
4.00 Nos.
1.00 Nos.
6.00 Nos.

0.0009 Cum

4"x0.25 Nut and Bolts with washers .Ele.8.1.64


Labour charges
Labour charges for fixing flush door shutters of any thickness to the
existing door frame including fixing the fixtures to the door shutter
excluding cost of shutter BMM-V.23

8.00 Nos.

Add LA on labour charges

20%

over heads & contractors profit


Rate per Each

14%

337269598.xlsx data-Bld-14-15

1.49 Sqmt

Page 1491 of 3205


120

Supply and fixing of Precast RCC Door Frame of size(0.75X1.98mt) using flush type Door with 30mm thick flush
Type faced on both the sides with Commercial type plywood including cost of necessary fittings like hinges, towe
labour charges completed for finished item of work as directed by Engineering Incharges.
Material
R.C.C.Door Frame (0.75X1.98) as per Nirmithi Kendra Specifications
Flush door shutters, solid bond wood block board type with commercial
ply on both faces.: 30 mm thick conforming to IS:2202-t BMT.N.16
MS Powder Coated Hinges125mm (MS) BMT.G.29
30mm Screws No.8 Ele.1.4.36
Aluminium Tower Bolts size 150 mm long BMT.G.08
12mm Screws No.8 Ele.1.4.34
Aluminium Door Handile 150mm long BMT.G.34
12mm Screws No.8 Ele.1.4.34
Aluminium All Drops 200 mm long BMT-G.40
50mm dia 5cm Bolt and Nuts with washers for alldrop.Ele.8.1.12
Sal Wooden Pieces size 6"x2"X1.25"- 4 Nos. BMT-E..15
4"x0.25 Nut and Bolts with washers .Ele.8.1.64

121

1 Nos.
1.20 Sqmt
2 Nos.
16 Nos.
1 Nos.
8 Nos.
2 Nos.
8 Nos.
1 Nos.
6 Nos.
0.0007 Cum
6 Nos.

Labour charges
Labour charges for fixing flush door shutters of any thickness to the
existing door frame including fixing the fixtures to the door shutter
excluding cost of shutter BMM-V.23

1.20 Sqmt

Add LA on labour charges

20%

Add Over heads & contr. profit


Rate per Each

14%

Observed data: Hallow Brick Masonry 6" in superstructure with CM (1:6) prop: . including c/c of all materials like
including seigniorage charges, & other taxes on all materials, all operational, incidental and labour charges suc
masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work Size of Hallow Birck (16"X
Hallow blocks ( local market rate)
Cement Mortar (1:6)
1st Class Mason
2nd Class Mason
Man Mazdoor
Basic Rate per Cum.
c.Overheads & Contractors Profit

74 Nos
0.15 cu.m.
0.60 Nos.
0.60 Nos.
2.75 Nos.
14%

Grand Total
Rate per One Cum
122

Observed data: Hallow Brick Masonry 4" thick for partition walls in CM (1:6) prop: and placing 2nos. of 6mm
with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including c/c
water etc., to site, seigniorage charges, & other taxes on all materials, all operational, incidental and labour
constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel
finished item of work Size of Hallow Birck (16"X8"X4"). (APSS No. 501 & 504).
Hallow blocks
Cement Mortar (1:6)
1st Class Mason
2nd Class Mason

114
0.13
0.60
0.60
337269598.xlsx data-Bld-14-15

Nos
cu.m.
Nos.
Nos.

Page 1492 of 3205


Man Mazdoor
sundries
Basic Rate per Cum.
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum

337269598.xlsx data-Bld-14-15

2.75

14%

Nos.

Page 1493 of 3205

SSR

all lifts and with an initial lead of 10m including all operational,
r finished item of work including seigniorage excluding dewatering
Cum
450.00
320.00

1 day
1 day.

Rs

0.00
1164.80
232.96
1397.76
873.60
2271.36
309.25
2580.61
258.06
0.00
0.00
258.06

all lifts and with an initial lead of 10m including all operational,
r finished item of work including seigniorage excluding dewatering
Cum
450.00
384.00
2791.00

1 day.
1 day.

0.00
3194.88

1 hours

16746.00

Rs

19940.88
2714.95
22655.83
0.00
0.00
22655.83
94.4
94.40

all lifts and with an initial lead of 10m including all operational,
r finished item of work including seigniorage excluding dewatering
Cum

320.00

1 day.
1 day.

0.00
1664.00
332.80
1996.80
1248.00
3244.80
441.78
337269598.xlsx data-Bld-14-15

Page 1494 of 3205

Rs

3686.58
368.66
0.00
0.00
368.66

337269598.xlsx data-Bld-14-15

Page 1495 of 3205

or all lifts and with an initial lead of 10m including all operational,
r finished item of work including seigniorage excluding dewatering
Cum
450.00
384.00
2791.00

1 day.
1 day.

0.00
2396.16

1 hours

16746.00

Rs

19142.16
2606.21
21748.37
120.82
0.00
0.00
120.82

or all lifts and with an initial lead of 10m including all operational,
r finished item of work including seigniorage excluding dewatering
Cum
450.00
576.00
576.00
384.00
1145.10

73.00
13.00

1 day.
1 day.
1 day.
1 day.

0.00
288.00
144.00
3206.40

1 hours

1145.10

1 Kg
100 Nos.

255.50
1.82

Rs

5040.82
686.31
5727.13
572.71
0.00
0.00
572.71

or all lifts and with an initial lead of 10m including all operational,
r finished item of work including seigniorage excluding dewatering
Cum
450.00
384.00

1 day
1 day

0.00
1996.80

1145.10

1 hour

6870.60

8867.40
1207.3
10074.70
337269598.xlsx data-Bld-14-15

Page 1496 of 3205


1007.47
0.00
0.00
1007.47

337269598.xlsx data-Bld-14-15

Page 1497 of 3205

as per drawing and technical specifications including setting out,


d disposal upto a lead of 50 m, dressing of sides and bottom and
MORD / 304 MORTH. for Sumps,Thrust blocks, column pits,

2.1 of MORT&H
Cum
450.00
384.00

1 Each
1 Each

Rs

0.00
1397.76
1397.76
195.69
1593.45
159.35
0.00
0.00
159.35

akers including breaking rock, loading in tippers and disposal with


ance with requirements of lines, grades and cross- sections as per
lifts)
Cum

450.00
384.00

1 day
1 day

0.00
3993.60

2791.00

1 hour

16746.00

909.70
194.00

1 hour
1 cum

5913.05
-3492.00
23160.65
3242.49
26403.14
2.00
0.00
26405.14
733.48
733.48

h initial lead in layers not exceeding 15 cm thick, consolidating each


site and all operational, incidental, labour charges, hire charges of

Cum
641.93

1 Cum

3851.58

450.00
384.00

1 day
1 day

0.00
119.04
3970.62
540.6
4511.22
337269598.xlsx data-Bld-14-15

Page 1498 of 3205


0.00
0.00
4511.22
751.87
751.87

337269598.xlsx data-Bld-14-15

Page 1499 of 3205

with initial lead in layers not exceeding 15 cm thick, consolidating


r to work site and all operational, incidental, labour charges, hire

Cum
306.76

1 Cum

1840.56

450.00
384.00

1 day
1 day

0.00
119.04
1959.60
266.8
2226.40
0.00
0.00
2226.40
371.07
371.07

ches, sides of foundations and basement with initial lead in layers


ng including cost and conveyance of water to work site and all
m of work. (APSS NO. 309 & 310)
Cum
450.00
384.00

1 day
1 day

0.00
119.04
16.21
135.25
0.00
0.00
135.25
22.54
22.54

mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using


materials like cement, sand, coarse aggregate water etc., to site ,
mming in 15 cm layers, finishing top surface to the required level

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

929.88
1340.83
356.37
123.60

504.00
384.00

1 day
1 day

50.40
906.24
3707.32
504.75
4212.07
0.00
0.00
4212.07
4212.07

Rs

Rs

337269598.xlsx data-Bld-14-15

Page 1500 of 3205

337269598.xlsx data-Bld-14-15

Page 1501 of 3205

ment concrete nominal mix (1:4:8) prop (Cement : fine aggregate:


cost and conveyance of all materials like cement, sand, coarse
mixing , laying, concrete , ramming in 15 cm layers, finishing top
nd under flooring bed.

5.74
1489.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

929.88
1340.83
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
3673.44
500.14
4173.58
0.00
0.00
4173.58
4173.58

Rs

Rs

al mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate )


of all materials like cement, sand, coarse aggregate water etc., to
ramming in 15 cm layers, finishing top surface to the required level

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
356.37
123.60

504.00
384.00

1 day
1 day

50.40
906.24
3521.34
479.43
4000.77
0.00
0.00
4000.77
4000.77

Rs

Rs

ent concrete nominal mix (1:5:10) prop (Cement : fine aggregate:


cost and conveyance of all materials like cement, sand, coarse
mixing , laying, concrete , ramming in 15 cm layers, finishing top
nd under flooring bed.

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
356.37
123.60
337269598.xlsx data-Bld-14-15

Page 1502 of 3205


338.60

1 hour

338.60

504.00
384.00

1 day
1 day

50.40
533.76
3487.46
474.82
3962.28
3962.28

Rs

Rs

al mix (1:6:10) prop (Cement : fine aggregate: coarse aggregate )


of all materials like cement, sand, coarse aggregate water etc., to
ramming in 15 cm layers, finishing top surface to the required level

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
427.64
123.60

504.00
384.00

1 day
1 day

50.40
906.24
3592.61
489.13
4081.74
0.00
0.00
4081.74
4081.74

Rs

Rs

ent concrete nominal mix (1:6:10) prop (Cement : fine aggregate:


cost and conveyance of all materials like cement, sand, coarse
mixing , laying, concrete , ramming in 15 cm layers, finishing top
nd under flooring bed.

5.74
1489.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

743.90
1340.83
427.64
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
3558.73
484.52
4043.25
0.00
0.00
4043.25
4043.25

Rs

Rs

337269598.xlsx data-Bld-14-15

Page 1503 of 3205

Cement : fine aggregate: coarse aggregate ) using 20mm size Hard


nt, sand, coarse aggregate water etc., to site , seigniorage charges
finishing top surface to the required level curing etc., complete for

5.74
1854.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

1262.80
1669.33
356.37
123.60

504.00
384.00

1 day
1 day

50.40
906.24
4368.74
594.8
4963.54
0.00
0.00
4963.54
4963.54

Rs

Rs

te nominal mix m-20 (Cement : fine aggregate: coarse aggregate )


eyance of all materials like cement, sand, coarse aggregate water
, concrete , ramming in 15 cm layers, finishing top surface to the

5.74
1854.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1669.33
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
4966.26
676.16
5642.42
0.00
0.00
5642.42
5642.42

Rs

Rs

gate: coarse aggregate) corresponding to Table 9 of IS 456 using


quarry including cost and conveyance of all materials like cement,
rges, sales & other taxes on all materials including all operational,
mplete but excluding cost of steel and its fabrication charges for
PLINTH, PEDESTALS

337269598.xlsx data-Bld-14-15

Page 1504 of 3205


1854.81
791.93
5.74

1 Cum
1 Cum
1 Kg

1669.33
356.37
2296.00

504.00
450.00
384.00

1 day.
1 day.
1 day.

67.03
120.15
1382.40

338.60

1 hour

338.60

175.40
103.00

1 hour
1 Kl
Rs

175.40
123.60
6528.88

Rs

6528.88
277.00
446.00
89.20
7341.08
999.49
8340.57
0.00
0.00
8340.57

6528.88
277.00
446.00

1 Cum
1 Cum
1 Cum

337269598.xlsx data-Bld-14-15

Page 1505 of 3205


6528.88
315.00
710.00

6528.88
1335.00
1075.00

1 Cum
1 Cum
1 Cum

Rs

6528.88
315.00
710.00
142.00
7695.88
1047.79
8743.67
0.00
0.00
8743.67

Rs

6528.88
1335.00
1075.00
215.00
9153.88
1246.3
10400.18
0.00
0.00
10400.18

1 Cum
1 Cum
1 Cum

gate: coarse aggregate) corresponding to Table 9 of IS 456 using


quarry including cost and conveyance of all materials like cement,
rges, sales & other taxes on all materials including all operational,
mplete but excluding cost of steel and its fabrication charges for
TELS, WATER TANKS, RCC WALLS IN BUILDINGS - WOODEN

1854.81
791.93
5.74

1 cum
1 cum
1 Kgs

1669.33
356.37
2296.00
4321.70

504.00
450.00
384.00

1 day
1 day
1 day

84.17
75.15
1804.80
1964.12

338.60

1 hour

338.60

175.40
103.00

1 hour
1 kl

175.40
123.60
637.60
6923.42
942.62
7866.04
0.00
0
7866.04
337269598.xlsx data-Bld-14-15

Page 1506 of 3205


Rs

6923.42
229.00
1268.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
6923.42
229.00
1522.00
304.40
253.60

4F
6923.42
229.00
1648.00
329.60
380.40

5F
6923.42
229.00
1775.00
355.00
507.20

922.97
10433.39
1420.51
11853.90
0.00
0.00
11853.90

999.88
10789.50
1468.99
12258.49
0.00
0.00
12258.49

7866.04

6923.42
229.00
1268.00
253.60
8674.02
1180.97
9854.99
0.00
0.00
9854.99

589.24

9821.66
1337.22
11158.88
0.00
0.00
11158.88

6923.42
760.00
903.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
6923.42

4F
6923.42

5F
6923.42

760.00

760.00

760.00

1084.00

1174.00

1264.00

216.80

234.80

252.80

6923.42
760.00
903.00
180.60
8767.02
1193.63
9960.65
0.00
0.00
9960.65

337269598.xlsx data-Bld-14-15

Page 1507 of 3205


180.60

270.90

361.20

922.97
10286.09
1400.45
11686.54
0.00
0.00
11686.54

999.88
10561.30
1437.92
11999.22
0.00
0.00
11999.22

589.236

9754.06
1328.01
11082.07
0.00
0.00
11082.07

337269598.xlsx data-Bld-14-15

Page 1508 of 3205

gate: coarse aggregate) corresponding to Table 9 of IS 456 using


quarry including cost and conveyance of all materials like cement,
rges, sales & other taxes on all materials including all operational,
mplete but excluding cost of steel and its fabrication charges for
MS -WOODEN SCAFFOLDING

1854.81
791.93
5.74

1 cum
1 cum
1 Kgs

1669.33
356.37
2296.00
4321.70

504.00
450.00
384.00

1 day
1 day
1 day

33.77
59.85
960.00
1053.62

338.60

1 hour

90.41

175.40
103.00

1 hour
1 kl

46.83
123.60
260.84
5636.16
767.36
6403.52
0
0
6403.52
6403.55

Rs
Thick
5636.16
152.00
121.00

0.10 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5636.16
1520.00
1450.00
290.00
242.00

4F
5636.16
1520.00
1570.00
314.00
363.00

5636.16
1520.00
1210.00
242.00
8608.16
1172
9780.16
0
0
9780.16
9780.20

5F
5636.16
1520.00
1690.00
338.00
484.00

337269598.xlsx data-Bld-14-15

Page 1509 of 3205


316.09

9454.25
1287.20
10741.45
0.00
0.00
10741.45
Thick
5636.16
152.00
121.00

184.87
9588.03
1305.41
10893.44
0.00
0.00
10893.44

200.28
9868.44
1343.59
11212.03
0.00
0.00
11212.03
0.125 m

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5636.16
1216.00
1160.00
232.00
193.60

4F
5636.16
1216.00
1256.00
251.20
290.40

5F
5636.16
1216.00
1352.00
270.40
387.20

184.87
8834.63
1202.83
10037.46

200.28
9062.04
1233.80
10295.84

5636.16
1216.00
968.00
193.60
8013.76
1091.07
9104.83
0
0
9104.83
9104.85

316.09

8753.85
1191.84
9945.69
Thick
5636.16
152.00
121.00

0.15 m
1 Cum
1 Sqm
1 Sqm
Rs

5636.16
1013.84
807.07
161.41
7618.48
1037.26
8655.74
0
337269598.xlsx data-Bld-14-15

Page 1510 of 3205

Rs
3F
5636.16
1013.84
967.15
193.43
161.41

4F
5636.16
1013.84
1047.19
209.44
242.12

5F
5636.16
1013.84
1127.23
225.45
322.83

184.87
8333.62
1134.62
9468.24
0.00
0.00
9468.24

200.28
8525.78
1160.79
9686.57
0.00
0.00
9686.57

0
8655.74
8655.75

316.09

8288.08
1128.42
9416.50
0.00
0.00
9416.50

337269598.xlsx data-Bld-14-15

Page 1511 of 3205

5636.16
1342.00
1064.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
5636.16
1342.00
1277.00
255.40
212.80

4F
5636.16
1342.00
1383.00
276.60
319.20

5F
5636.16
1342.00
1490.00
298.00
425.60

184.87
9141.83
1244.66
10386.49

200.28
9392.04
1278.73
10670.77

5636.16
1342.00
1064.00
212.80
8254.96
1123.91
9378.87
9378.90

316.09

9039.45
1230.72
10270.17
- up to 3.66m above GL
5636.16
150.00
139.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
352.26
150.00
167.00
33.40
27.80

4F
352.26
150.00
181.00
36.20
41.70

352.26
150.00
139.00
27.80
669.06
91.09
760.15
0
0
760.15
760.15

5F
352.26
150.00
195.00
39.00
55.60

337269598.xlsx data-Bld-14-15

Page 1512 of 3205


316.09

1046.55
142.49
1189.04
0.00
0.00
1189.04

184.87

200.28

946.03
128.80
1074.83
0.00
0.00
1074.83

992.14
135.08
1127.22
0.00
0.00
1127.22

337269598.xlsx data-Bld-14-15

Page 1513 of 3205

nding to IS 456 using WEIGH BATCHER with 20mm size graded


cost and conveyance of all materials like cement, fine aggregate
ding all operational, incidental and labour charges such as weigh
ges etc.,complete but excluding seignorage charges, cost of steel
cement content as per IS code for PLINTH, PEDESTALS and

exact quantities will be as per mix design. 2) As per mix design, if


educted

1854.81
791.93
5.74
504.00
450.00
384.00

1 Cum
1 Cum
1 Kg
1 day.
1 day.
1 day.

1483.85
316.77
2009.00
67.03
120.15
1766.40

556.80
152.20
103.00

1 hour
1 hour
1 Kl
Rs

742.21
202.88
123.60
6831.89

Rs

6831.89
277.00
446.00
89.20
7644.09
1040.74
8684.83
0.00
0.00
8684.83

Rs

6831.89
315.00
710.00
142.00
7998.89
1089.05
9087.94

Rs

6831.89
1335.00
1075.00
215.00
9456.89
1287.56
10744.45

6831.89
277.00
446.00

6831.89
315.00
710.00

6831.89
1335.00
1075.00

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

337269598.xlsx data-Bld-14-15

Page 1514 of 3205

onding to IS 456 using WEIGH BATCHER with 20mm size graded


cost and conveyance of all materials like cement, fine aggregate
ding all operational, incidental and labour charges such as weigh
ges etc.,complete but excluding seignorage charges, cost of steel
ement content as per IS code for COLUMNS, LINTELS, WATER

exact quantities will be as per mix design. 2) As per mix design, if


educted.

1854.81
791.93
5.74

1 cum
1 cum
1 Kgs

1483.85
316.77
2009.00
3809.62

504.00
450.00
384.00

1 day
1 day
1 day

84.17
75.15
2150.40
2309.72

556.80
152.20
103.00

1 hour
1 hour
1 kl

742.21
202.88
123.60
1068.69
7188.03
978.65
8166.68
8166.68

Rs

7188.03
341.00
1603.00

1 Cum
1 Cum
1 Cum
Rs
Rs

3F

4F

5F

7188.03

7188.03

7188.03

341.00
1924.00

341.00
2084.00

341.00
2244.00

384.80
320.60

416.80
480.90

448.80
641.20

922.97
11433.70

999.88
11862.91

7188.03
341.00
1603.00
320.60
9452.63
1286.98
10739.61

692.92

10851.35

337269598.xlsx data-Bld-14-15

Page 1515 of 3205


1477.41
12328.76
12328.76

1556.70
12990.40
12990.40

1615.14
13478.05
13478.05

10739.61
=

10.6%

10.60%
10.60%

Rs

36.15
169.92
10945.67
0.00
10945.67

337269598.xlsx data-Bld-14-15

Page 1516 of 3205


7188.03
615.00

1 Cum
1 Cum

7188.03
615.00

2537.00

1 Cum

2537.00
507.40
10847.43
1476.88
12324.31
0.00
0.00
12324.31

Rs

Rs

7188.03
1133.00
1141.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
7188.03
1133.00
1369.00
273.80
228.20

4F
7188.03
1133.00
1483.00
296.60
342.30

5F
7188.03
1133.00
1597.00
319.40
456.40

922.97

999.88

10884.95

11365.90

11693.71

1481.99

1547.47

1592.10

12366.94

12913.37

13285.81

0.00

0.00

0.00

0.00

0.00

0.00

12366.94

12913.37

13285.81

7188.03
1133.00
1141.00
228.20
9690.23
1319.32
11009.55
0.00
0.00
11009.55

692.92

)
7188.03
876.00

1 Cum
1 Sqm

7188.03
5842.92
Rs

13030.95

337269598.xlsx data-Bld-14-15

Page 1517 of 3205


1774.16
14805.11
0.00
0.00
Rs

14805.11

nding to IS 456 using WEIGH BATCHER / MIXER with 20mm size


including cost and conveyance of all materials like cement, fine
es, sales & other taxes on all materials including all operational,
vibrating, curing, centering, shuttering charges etc.,complete but
content as per IS code for finished item of work. for RCC SLABS,
um for estimating purpose only.The exact quantities will be as per
Cum the defference in cost shall be deducted.

1854.81
791.93
5.74

1 Cum
1 Cum
1 Cum

1483.85
316.77
2009.00
3809.62

504.00
450.00
384.00

1 Cum
1 Cum
1 Cum

33.77
59.85
1181.57
1275.19

556.80
152.20
103.00

1 Cum
1 hour
1 Cum

171.49
46.88
123.60
341.97
5426.78
738.86
6165.64
0
0
6165.64
6165.64

Rs

5426.78
3681.00
2471.00

1 Cum
1 Cum
1 Cum
Rs

Rs

5426.78
3681.00
2471.00
494.20
12072.98
1643.74
13716.72
0.00
0.00
13716.72

337269598.xlsx data-Bld-14-15

Page 1518 of 3205


Thick
5426.78
227.00
152.00

0.075
1 Cum
1 Sqm
1 Sqm

Rs

Rs

5426.78
3025.91
2026.16
405.23
10884.08
1481.87
12365.95
0.00
0.00
12365.95

337269598.xlsx data-Bld-14-15

Page 1519 of 3205


Thick
5426.78
227.00
152.00

0.10 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5426.78
2270.00
1820.00
364.00
304.00
382.56

10567.34
1438.74
12006.08
0.00
0.00
12006.08
Thick
5426.78
227.00
152.00

4F
5426.78
2270.00
1980.00
396.00
456.00

5F
5426.78
2270.00
2130.00
426.00
608.00

186.95
10715.73
1458.95
12174.68
0.00
0.00
12174.68

202.53
11063.31
1506.27
12569.58
0.00
0.00
12569.58
0.11 m

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5426.78
2063.43
1654.55
330.91
276.36

5426.78
2270.00
1520.00
304.00
9520.78
1296.25
10817.03
0.00
0.00
10817.03

4F
5426.78
2063.43
1800.00
360.00
414.55

5F
5426.78
2063.43
1936.36
387.27
552.73

186.95
10251.70

202.53
10569.10

5426.78
2063.43
1381.68
276.34
9148.23
1245.53
10393.76
0.00
0.00
10393.76

382.56

10134.59

337269598.xlsx data-Bld-14-15

Page 1520 of 3205


1379.82
11514.41
0.00
0.00
11514.41

1395.77
11647.47
0.00
0.00
11647.47

1438.98
12008.08
0.00
0.00
12008.08

337269598.xlsx data-Bld-14-15

Page 1521 of 3205


Thick
5426.78
227.00
152.00

0.115 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5426.78
1973.91
1582.61
316.52
264.35

4F
5426.78
1973.91
1721.74
344.35
396.52

5F
5426.78
1973.91
1852.17
370.43
528.70

186.95
10050.25
1368.34
11418.59
0.00
0.00
11418.59

202.53
10354.52
1409.77
11764.29
0.00
0.00
11764.29

5426.78
1974.90
1322.40
264.48
8988.56
1223.79
10212.35
0.00
0.00
10212.35

382.56

9946.73
1354.25
11300.98
0.00
0.00
11300.98
Thick
5426.78
227.00
152.00

0.12 m
1 Cum
1 Sqm
1 Sqm
Rs
Rs

3F
5426.78
1891.67
1516.67
303.33
253.33

4F
5426.78
1891.67
1650.00
330.00
380.00

5F
5426.78
1891.67
1775.00
355.00
506.67

186.95
9865.39
1343.17
11208.56

202.53
10157.64
1382.96
11540.60

5426.78
1890.91
1266.16
253.23
8837.08
1203.17
10040.25

382.56

9774.34
1330.78
11105.12
Thick
5426.78
227.00

0.125 m
1 Cum
1 Sqm

5426.78
1816.00
337269598.xlsx data-Bld-14-15

Page 1522 of 3205


152.00

1 Sqm
Rs

Rs

1216.00
243.20
8701.98
1184.77
9886.75
0.00
0.00
9886.75

337269598.xlsx data-Bld-14-15

Page 1523 of 3205


3F
5426.78
1816.00
1456.00
291.20
243.20
382.56

9615.74
1309.18
10924.92
0.00
0.00
10924.92
Thick
5426.78
227.00
152.00

4F
5426.78
1816.00
1584.00
316.80
364.80

5F
5426.78
1816.00
1704.00
340.80
486.40

186.95
9695.33
1320.02
11015.35
0.00
0.00
11015.35

202.53
9976.51
1358.30
11334.81
0.00
0.00
11334.81
0.15 m

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5426.78
1514.09
1213.33
242.67
202.67
382.56

8982.10
1222.91
10205.01
0.00
0.00
10205.01

4F
5426.78
1514.09
1320.00
264.00
304.00

5F
5426.78
1514.09
1420.00
284.00
405.33

186.95
9015.82
1227.50
10243.32
0.00
0.00
10243.32

202.53
9252.73
1259.76
10512.49
0.00
0.00
10512.49

5426.78
1514.09
1013.84
202.77
8157.48
1110.64
9268.12
0.00
0.00
9268.12

9268.12
=
10.60%

10.6%
24.06
337269598.xlsx data-Bld-14-15

Page 1524 of 3205


10.60%

Rs

16.11
9308.29
0.00
9308.29

337269598.xlsx data-Bld-14-15

Page 1525 of 3205


Thick
5426.78
233.00
157.00

0.16 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5426.78
1456.25
1175.00
235.00
196.25
382.56

8871.84
1207.90
10079.74
0.00
0.00
10079.74
Thick
5426.78
233.00
157.00

4F
5426.78
1456.25
1275.00
255.00
294.38

5F
5426.78
1456.25
1375.00
275.00
392.50

186.95
8894.35
1210.97
10105.32
0.00
0.00
10105.32

202.53
9128.06
1242.78
10370.84
0.00
0.00
10370.84
0.200 m

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5426.78
1165.00
940.00
188.00
157.00

5426.78
1456.25
981.25
196.25
8060.53
1097.44
9157.97
0.00
0.00
9157.97

4F
5426.78
1165.00
1020.00
204.00
235.50

5426.78
1165.00
785.00
157.00
7533.78
1025.72
8559.50
0.00
0.00
8559.50
8559.50

5F
5426.78
1165.00
1100.00
220.00
314.00

382.56

337269598.xlsx data-Bld-14-15

Page 1526 of 3205

8259.34
1124.51
9383.85
0.00
0.00
9383.85

186.948
8238.23
1121.63
9359.86
0.00
0.00
9359.86

202.527
8428.31
1147.51
9575.82
0.00
0.00
9575.82

337269598.xlsx data-Bld-14-15

Page 1527 of 3205


Thick
5426.78
233.00
157.00

0.25 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5426.78
932.00
752.00
150.40
125.60

4F
5426.78
932.00
816.00
163.20
188.40

5F
5426.78
932.00
880.00
176.00
251.20

186.948
7713.33
1050.17
8763.50
0.00
0.00
8763.50

202.527
7868.51
1071.3
8939.81
0.00
0.00
8939.81

5426.78
932.00
628.00
125.60
7112.38
968.35
8080.73
0.00
0.00
8080.73

382.56

7769.34
1057.80
8827.14
0.00
0.00
8827.14
Thick
5426.78
244.00
164.00

0.325 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs

5426.78
2002.00
1344.00

1 Cum
1 Cum
1 Cum
Rs

Rs

5426.78
751.52
505.12
101.02
6784.44
923.70
7708.14
0.00
0.00
7708.14

5426.78
2002.00
1344.00
268.80
9041.58
1231.01
10272.59
0.00
0.00
10272.59
337269598.xlsx data-Bld-14-15

Page 1528 of 3205

337269598.xlsx data-Bld-14-15

Page 1529 of 3205


3F
5426.78
2002.00
1613.00
322.60
268.80

4F
5426.78
2002.00
1747.00
349.40
403.20

5F
5426.78
2002.00
1882.00
376.40
403.20

184.87
10113.25
1376.92
11490.17

200.28
10290.66
1401.07
11691.73

255.04

9888.22
1346.28
11234.50

10272.59
=

10.6%

10.60%
10.60%

Rs

5426.78
224.00
175.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
339.17
224.00
210.00
42.00
35.00

4F
339.17
224.00
228.00
45.60
52.50

212.21
142.46
10627.27
0.00
10627.27

339.17
224.00
175.00
35.00
773.17
105.27
878.44
878.44

5F
339.17
224.00
245.00
49.00
70.00

23.91

337269598.xlsx data-Bld-14-15

Page 1530 of 3205

874.08
119.01
993.09
0.00
0.00
993.09

11.55
900.82
122.65
1023.47
0.00
0.00
1023.47

12.52
939.69
127.94
1067.63
0.00
0.00
1067.63

cally Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500
es for straightening, cutting, bending to required sizes and shapes,
icing with binding wire of 18 SWG, forming grills for reinforcement
including all wastages such as overlaps, couplings, chairs, spacer
tional, labour charges such as cutting, bending, placing in position,
k in all floors.( APSS No.126

34000.00
70.00

1 Ton
1 kg

35700.00
420.00
36120.00

588.00
384.00

1 day
1 day

5880.00
3840.00
9720.00
45840.00
6417.60
52257.60
0.00
0.00
52258.00
52.26

1 MT

Sub Total:
Rs.
3F
45840.00
2916.00

4F
45840.00
3888.00

5F
45840.00
4860.00

48756.00
6638.13
55394.13
55.39

49728.00
6770.47
56498.47
56.50

50700.00
6902.81
57602.81
57.60

337269598.xlsx data-Bld-14-15

Page 1531 of 3205

1x7 Cm in Cement Mortor 1:3 Prop including Cost & conveyance


s on all materials, including all labour charges like mixing Cement
work

5.74
4700.00

1 Kg
1000 Nos

551.04
2406.40

791.93

1 Cum

158.39
3115.83

504.00
450.00
384.00

1 day.
1 day.
1 day.

120.96
252.00
725.76

Rs

Rs
3F
4214.55
43.17
466.91
93.38
255.04

4F
4214.55
43.17
572.87
114.57
382.56

5F
4214.55
43.17
678.78
135.76
510.08

329.62

439.49

549.36

5402.67
735.57
6138.24
0.00
0.00
6138.24

5767.21
785.21
6552.42
0.00
0.00
6552.42

6131.70
834.83
6966.53
0.00
0.00
6966.53

1098.72
4214.55
573.81
4788.36
0.00
0.00
4788.36
4788.36

1x7 Cm in Cement Mortor 1:4 Prop including Cost & conveyance


s on all materials, including all labour charges like mixing Cement
work

5.74
4700.00
791.93

504.00

1 Kg
1000 Nos
1 Cum

1 day.

413.28
2406.40
158.39
2978.07
120.96
337269598.xlsx data-Bld-14-15

Page 1532 of 3205


450.00
384.00

1 day.
1 day.
Rs

Rs

252.00
725.76
1098.72
4076.79
555.05
4631.84
0.00
0.00
4631.84
4631.84

337269598.xlsx data-Bld-14-15

Page 1533 of 3205


3F
4076.79
43.17
466.91
93.38
255.04

4F
4076.79
43.17
572.87
114.57
382.56

5F
4076.79
43.17
678.78
135.76
510.08

329.62

439.49

549.36

5264.91
716.82
5981.73
0.00
0.00
5981.73

5629.45
766.45
6395.90
0.00
0.00
6395.90

5993.94
816.07
6810.01
0.00
0.00
6810.01

7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of


on all materials, including all labour charges like mixing Cement
work

5.74
4700.00
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

275.52
2406.40
158.39
2840.31

1 day.
1 day.
1 day.
Rs

Rs
3F
3939.03
43.17
466.91
93.38
255.04

4F
3939.03
43.17
572.87
114.57
382.56

5F
3939.03
43.17
678.78
135.76
510.08

329.62

439.49

549.36

5127.15
698.06

5491.69
747.69

5856.18
797.32

120.96
252.00
725.76
1098.72
3939.03
536.3
4475.33
4475.33

337269598.xlsx data-Bld-14-15

Page 1534 of 3205


5825.21
0.00
0.00
5825.21

6239.38
0.00
0.00
6239.38

6653.50
0.00
0.00
6653.50

337269598.xlsx data-Bld-14-15

Page 1535 of 3205

ocks of size 290 x 225 x 140 mm for manufacturing of flyash solid


g cost and conveyance of all materials, labour charges, seiniorage
kg/sqm for walls for Superstructure Walls.

24000.00
2356.28

504.00
450.00
384.00

1000 Nos
1 Cum

2376.00
235.63
2611.63

1 day.
1 day.
1 day.

211.68
414.00
1075.20

Rs

Rs
3F
4312.51
44.13
477.29
95.46
260.71

4F
4312.51
44.13
585.60
117.12
391.07

5F
4312.51
44.13
693.87
138.77
521.42

510.26

680.35

850.44

5700.36
776.10
6476.46
0.00
0.00
6476.46

6130.78
834.71
6965.49
0.00
0.00
6965.49

6561.14
893.30
7454.44
0.00
0.00
7454.44

1700.88
4312.51
587.15
4899.66
4899.66

ocks of size 290 x 200 x 140 mm for manufacturing of flyash solid


g cost and conveyance of all materials, labour charges, seiniorage
kg/sqm for walls for Superstructure Walls.

19000.00
2356.28

504.00
450.00
384.00

1000 Nos
1 Cum

2109.00
235.63
2344.63

1 day.
1 day.
1 day.
Rs

211.68
414.00
1075.20
1700.88
4045.51
550.8
4596.31
337269598.xlsx data-Bld-14-15

Page 1536 of 3205

Rs

0
0
4596.31
4596.35

337269598.xlsx data-Bld-14-15

Page 1537 of 3205


3F
4045.51
49.65
536.95
107.39
293.30

4F
4045.51
49.65
658.80
131.76
439.95

5F
4045.51
49.65
780.60
156.12
586.60

510.26

680.35

850.44

5543.06
754.69
6297.75
0.00
0.00
6297.75

6006.02
817.72
6823.74
0.00
0.00
6823.74

6468.92
880.74
7349.66
0.00
0.00
7349.66

ocks of size 290 x 150 x 140 mm for manufacturing of flyash solid


g cost and conveyance of all materials, labour charges, seiniorage
kg/sqm for walls for Superstructure Walls.

19000.00
2356.28

504.00
450.00
384.00

1000 Nos
1 Cum

2812.00
235.63
3047.63

1 day.
1 day.
1 day.
Rs

Rs
3F
4748.51
66.20
715.93
143.19
391.07

4F
4748.51
66.20
878.40
175.68
586.61

5F
4748.51
66.20
1040.80
208.16
782.14

510.26

680.35

850.44

6575.16
895.21
7470.37
0.00
0.00
7470.37

7135.75
971.53
8107.28
0.00
0.00
8107.28

7696.25
1047.84
8744.09
0.00
0.00
8744.09

211.68
414.00
1075.20
1700.88
4748.51
646.51
5395.02
0.00
0.00
5395.02
5395.02

337269598.xlsx data-Bld-14-15

Page 1538 of 3205

ocks of size 290 x 112/100 x 140 mm for manufacturing of flyash


st including cost and conveyance of all materials, labour charges,
essthan 50 kg/sqm for walls for Superstructure Walls.

11000.00
2356.28

504.00
450.00
384.00

1000 Nos
1 Cum

2178.00
235.63
2413.63

1 day.
1 day.
1 day.

211.68
414.00
1075.20

Rs

Rs
3F
4114.51
88.66
958.84
191.77
523.75

4F
4114.51
88.66
1176.43
235.29
785.63

5F
4114.51
88.66
1393.93
278.79
1047.50

510.26

680.35

850.44

6387.79
869.70
7257.49
0.00
0.00
7257.49

7080.86
964.06
8044.92
0.00
0.00
8044.92

7773.83
1058.41
8832.24
0.00
0.00
8832.24

1700.88
4114.51
560.19
4674.70
0.00
0.00
4674.70
4674.70

cm (1:3) using second class traditional size bricks including cost of


sonry, mixing cement mortar, curing etc., complete for finished item

4700.00
5.74
791.93

504.00
450.00
384.00

1000 Nos
1 Kg
1 Cum

1 day.
1 day.
1 day.

2655.50
608.44
174.22
3438.16
302.40
270.00
1056.00
1628.40
5066.56
337269598.xlsx data-Bld-14-15

Page 1539 of 3205


Rs

Rs

58.49
5125.05
697.78
5822.83
0.00
0.00
5822.83

337269598.xlsx data-Bld-14-15

Page 1540 of 3205


3F
5125.05
86.35
933.83
186.77
510.09

4F
5125.05
86.35
1145.74
229.15
765.14

5F
5125.05
86.35
1357.57
271.51
1020.18

488.52

651.36

814.20

7330.61
998.06
8328.67
0.00
0.00
8328.67

8002.78
1089.58
9092.36
0.00
0.00
9092.36

8674.86
1181.08
9855.94
0.00
0.00
9855.94

Prop using hard granite stone including cost & Conveyance of all
ll Materials, ,labour charges for cutting Stones to required size and
for finished item of Work .

5.74
1112.81
1684.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

385.73
1046.04
269.57
221.74

504.00
384.00

1 day
1 day

1260.00
890.88
4073.96
554.67
4628.63
0.00
0.00
4628.63

Rs

Rs

) Prop using hard granite stone including cost & Conveyance of all
ll Materials, ,labour charges for cutting Stones to required size and
for finished item of Work .

5.74
1112.81
1684.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

440.83
1046.04
269.57
253.42

504.00
384.00

1 day
1 day

756.00
890.88
3656.74
497.87
4154.61
0.00
0.00
4154.61

Rs

Rs

337269598.xlsx data-Bld-14-15

Page 1541 of 3205

337269598.xlsx data-Bld-14-15

Page 1542 of 3205

ng hard granite stone including cost & Conveyance of all materials


als, ,labour charges for cutting Stones to required size and shape,
hed item of Work .

5.74
1112.81
896.81
1684.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum
1 Cum

454.61
489.64
448.41
269.57
261.34

504.00
384.00

1 day
1 day

604.80
768.00
3296.37
448.8
3745.17
0.00
0.00
3745.17

Rs

Rs

ng hard granite stone including cost & Conveyance of all materials


als, ,labour charges for cutting Stones to required size and shape,
hed item of Work .

5.74
1112.81
896.81
1684.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum
1 Cum

340.96
489.64
448.41
269.57
261.34

504.00
384.00

1 day
1 day

604.80
768.00
3182.72
433.33
3616.05
0.00
0.00
3616.05

Rs

Rs

r (1:3) Prop . for including cost & conveyance of all materials to site
ete for finished item of work

5.74
858.93

1 Kg
1 Cum

82.66
25.77

450.00
384.00

1 day
1 day

225.00
284.16
617.59
84.08
701.67
0.00
0.00

Rs

337269598.xlsx data-Bld-14-15

Page 1543 of 3205


Rs
Rs

701.67
70.17

337269598.xlsx data-Bld-14-15

Page 1544 of 3205

tor (1:3) Prop . for including cost & conveyance of all materials to
omplete for finished item of work

5.74
791.93

1 Kg
1 Cum

165.31
47.52

450.00
384.00

1 day
1 day

225.00
284.16
721.99
98.3
820.29
0.00
0.00
820.29
82.03

Rs

Rs
Rs

smooth including cost and conveyance of all materials to site,


cidental, labour charges etc., including cutting grooves where ever
Ceiling)

3733.88

1 Cum

560.08

504.00
384.00

1 day
1 day

302.40
368.64
671.04
1231.12
167.62
1398.74
0.00
0.00
1398.74
139.87

Rs

Rs
Rs
3F
1231.12
23.70
215.40
43.08
119.50

4F
1231.12
23.70
263.30
52.66
179.25

5F
1231.12
23.70
311.30
62.26
239.00

201.31

268.42

335.52

1834.11
249.71
2083.82
208.38

2018.45
274.81
2293.26
229.33

2202.90
299.92
2502.82
250.28

337269598.xlsx data-Bld-14-15

Page 1545 of 3205

smooth including cost and conveyance of all materials to site,


cidental, labour charges etc., including cutting grooves where ever

3045.08

1 Cum

456.76

504.00
384.00

1 day
1 day

302.40
368.64
671.04
1127.80
153.55
1281.35
128.14

Rs
Rs
3F
1127.80
9.90
107.40
21.48
58.70

4F
1127.80
9.90
131.80
26.36
88.05

5F
1127.80
9.90
156.10
31.22
117.40

201.31

268.42

335.52

1526.59
207.85
1734.44
173.44

1652.33
224.96
1877.29
187.73

1777.94
242.07
2020.01
202.00

smooth including cost and conveyance of all materials to site,


cidental, labour charges etc., including cutting grooves where ever

2356.28

1 Cum

353.44

504.00
384.00

1 day
1 day

302.40
368.64
671.04
1024.48
139.48
1163.96
0.00
0.00
1163.96
116.40

Rs

Rs
Rs
3F
1024.48
9.90
107.40
21.48
58.70

4F
1024.48
9.90
131.80
26.36
88.05

5F
1024.48
9.90
156.10
31.22
117.40

337269598.xlsx data-Bld-14-15

Page 1546 of 3205


201.31

268.42

335.52

1423.27
193.78
1617.05
0.00
0.00
1617.05
161.71

1549.01
210.90
1759.91
0.00
0.00
1759.91
175.99

1674.62
228.00
1902.62
0.00
0.00
1902.62
190.26

smooth including cost and conveyance of all materials to site,


cidental, labour charges etc., including cutting grooves where ever

3045.08

1 Cum

578.56

504.00
384.00

1 day
1 day

302.40
368.64
671.04
1249.60
170.13
1419.73
141.97

Rs
Rs
Rs

337269598.xlsx data-Bld-14-15

Page 1547 of 3205


3F
1249.60
9.90
107.40
21.48
58.70

4F
1249.60
9.90
131.80
26.36
88.05

5F
1249.60
9.90
156.10
31.22
117.40

201.31

268.42

335.52

1648.39
224.43
1872.82
0.00
0.00
1872.82
187.28

1774.13
241.55
2015.68
0.00
0.00
2015.68
201.57

1899.74
258.65
2158.39
0.00
0.00
2158.39
215.84

smooth including cost and conveyance of all materials to site,


cidental, labour charges etc., including cutting grooves where ever

3045.08

1 Cum

639.47

504.00
384.00

1 day
1 day

473.76
614.40
1088.16
1727.63
235.22
1962.85
0.00
0.00
1962.85
196.29

Rs

Rs
Rs
3F
1727.63
9.90
107.40
21.48
58.70

4F
1727.63
9.90
131.80
26.36
88.05

5F
1727.63
9.90
156.10
31.22
117.40

326.45

435.26

544.08

2251.56
306.55
2558.11
0.00
0.00
2558.11
255.81

2419.00
329.35
2748.35
0.00
0.00
2748.35
274.84

2586.33
352.13
2938.46
0.00
0.00
2938.46
293.85

337269598.xlsx data-Bld-14-15

Page 1548 of 3205

M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge
site, seigniorage charges, all operational, including charges, labour
oves where ever necessary etc., complete for finished item of work

5.74
791.93

1 Kg
1 Cum

246.82
142.55

5.74
791.93

1 Kg
1 Cum

83.23
31.68
504.28

504.00
450.00
384.00

1 day
1 day
1 day

317.52
661.50
1497.60
2476.62
2980.90
405.85
3386.75
0.00
0.00
3386.75
338.68

Rs

Rs
Rs
3F
2980.90
9.90
107.40
21.48
58.70

4F
2980.90
9.90
131.80
26.36
88.05

5F
2980.90
9.90
156.10
31.22
117.40

742.99

990.65

1238.31

3921.37
533.89
4455.26
445.53

4227.66
575.60
4803.26
480.33

4533.83
617.28
5151.11
515.11

n C.M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara
tc., to site, seigniorage charges, all operational, including charges,
g grooves where ever necessary etc., complete for finished item of

5.74
791.93

1 Kg
1 Cum

181.96
87.11

5.74
791.93

1 Kg
1 Cum

110.21
31.68
410.96
337269598.xlsx data-Bld-14-15

Page 1549 of 3205


504.00
450.00
384.00

1 day
1 day
1 day
Rs

Rs
Rs

317.52
661.50
1497.60
2476.62
2887.58
393.14
3280.72
0.00
0.00
3280.72
328.07

337269598.xlsx data-Bld-14-15

Page 1550 of 3205


3F
2887.58
9.90
107.40
21.48
58.70

4F
2887.58
9.90
131.80
26.36
88.05

5F
2887.58
9.90
156.10
31.22
117.40

742.99

990.65

1238.31

3828.05
521.19
4349.24
0.00
0.00
4349.24
434.92

4134.34
562.89
4697.23
0.00
0.00
4697.23
469.72

4440.51
604.58
5045.09
0.00
0.00
5045.09
504.51

e mesh & nominal reinforcement as directed by Engineer-in-charge


orage charges, sales & other taxes on all materials, operational &
folding and form work, lift charges etc., complete for finished items
S No.403 & 903)

17.00
3733.88
5.74
1231.12

1 sqm
1 cum
1 kg
10 sqm

226.10
933.47
287.00
2683.84
4130.41

504.00
450.00
384.00

1 day
1 day
1 day

4032.00
450.00
3840.00
8322.00

303.10

1 Hrs

606.20
Rs

Rs
Rs
3F
13058.61
2496.60

4F
13058.61
3328.80

5F
13058.61
4161.00

15555.21
2117.84

16387.41
2231.15

17219.61
2344.45

13058.61
1777.93
14836.54
0.00
0.00
14836.54
1483.65

337269598.xlsx data-Bld-14-15

Page 1551 of 3205


17673.05
0.00
0.00
17673.05
1767.31

18618.56
0.00
0.00
18618.56
1861.86

19564.06
0.00
0.00
19564.06
1956.41

337269598.xlsx data-Bld-14-15

Page 1552 of 3205


& SKIRTING

thick (Tandur Stone slabs) set over base coat of CM (1:8) over
ncy spread @ 3.3 kgs per sqm. & Jointed with neat cement to full
etc., complete, including seigniorage charges, labour charges for
onveyance of all materials.

1654.00

10 sqm

1819.40

5.74
5.74
5.74
858.93

1 kg.
1 kg.
1 kg.
1 cum

123.98
189.42
114.80
103.07
2350.67

504.00
450.00
384.00

1 day
1 day
1 day

1562.40
495.00
330.24
2387.64
4738.31
47.38
4785.69
651.57
5437.26
0.00
0.00
5437.26
543.73

Rs

Rs
Rs
3F
4785.69
716.29

4F
4785.69
955.06

5F
4785.69
1193.82

5501.98
749.09
6251.07
625.11

5740.75
781.60
6522.35
652.24

5979.51
814.11
6793.62
679.36

mum 25 mm thick (0.254M x 0.254M) set over base coat of CM


like consistency spread @ 3.3 kgs per sqm. & Jointed with neat
oring stones etc., complete, including seigniorage charges, labour
e cost and conveyance of all materials.

2756.00

10 sqm

3031.60

5.74
5.74
5.74
858.93

1 kg.
1 kg.
1 kg.
1 cum

123.98
189.42
114.80
103.07
3562.87

337269598.xlsx data-Bld-14-15

Page 1553 of 3205


504.00
450.00
384.00

1 day
1 day
1 day

Rs
Rs
Rs

1562.40
495.00
330.24
2387.64
5950.51
59.51
6010.02
818.26
6828.28
682.83

337269598.xlsx data-Bld-14-15

Page 1554 of 3205


3F
6010.02
716.29

4F
6010.02
955.06

5F
6010.02
1193.82

6726.31
915.79
7642.10
0.00
0.00
7642.10
764.21

6965.08
948.30
7913.38
0.00
0.00
7913.38
791.34

7203.84
980.80
8184.64
0.00
0.00
8184.64
818.46

over base coat of cement mortar (1 : 8) 12 mm thick over CC bed


s nearly, including cost of all materials like flooring stone, cement,
dressing of flooring stones etc., complete for finished item of

1239.00

10 Sqm

1300.95

5.74
5.74
858.93
858.93

1 Kg
1 Kg
1 Cum
1 Cum

123.98
55.10
103.07
17.18
1600.28

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
2759.04
4359.32
593.52
4952.84
0.00
0.00
4952.84
495.28

Rs

Rs
Rs

shade) set over base coat of cement mortar (1:6) 12 mm thick over
ency spread @ 3.3.kgs per sqm & jointed with neat cement to full
sand water and tiles etc., complete, including seigniorage charges,

314.00

1 sqm

3297.00

5.74
5.74
5.74

1 kg.
1 kg.
1 kg.
1 kg.
1 cum

165.31
189.42
34.44
0.00
103.07
3789.24

858.93

337269598.xlsx data-Bld-14-15

Page 1555 of 3205

450.00
384.00
384.00

1 day
1 day
1 day

Rs
Rs
Rs

432.00
860.16
1267.20
2559.36
6348.60
63.49
6412.09
873.01
7285.10
728.51

337269598.xlsx data-Bld-14-15

Page 1556 of 3205


3F
6412.09
767.81

4F
6412.09
1023.74

5F
6412.09
1279.68

7179.90
977.54
8157.44
0.00
0.00
8157.44
815.74

7435.83
1012.39
8448.22
0.00
0.00
8448.22
844.82

7691.77
1047.23
8739.00
0.00
0.00
8739.00
873.90

mm x 10 mm thickness glossy finish permium colours high


(1:8), 12 mm thick over CC bed already laid or RCC roof slab,
d neatly with white cement paste to full depth mixed with pigment of
lete, including seigniorage charges, etc., complete for finished item

1398.00

1 sqm

14679.00

5.74
5.74
5.74
858.93
858.93

1 kg.
1 kg.
1 kg.
1 cum
1 cum

123.98
189.42
34.44
103.07
17.18
15147.09

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
2759.04
17906.13
179.06
18085.19
2462.3
20547.49
0.00
0.00
20547.49
2054.75

Rs
Rs
3F
18085.19
827.71

4F
18085.19
1103.62

5F
18085.19
1379.52

18912.90
2574.99
21487.89
0.00
0.00

19188.81
2612.56
21801.37
0.00
0.00

19464.71
2650.12
22114.83
0.00
0.00
337269598.xlsx data-Bld-14-15

Page 1557 of 3205


21487.89
2148.79

21801.37
2180.14

22114.83
2211.48

337269598.xlsx data-Bld-14-15

Page 1558 of 3205

x 8 mm thickness, regular finish and normal colours, set over


b, including neat cement slurry of honey like consistency spread @
of matching shade, including cost of all materials like cement, sand
m of work, including the cost and conveyance of all materials.

631.00

1 sqm

6625.50

5.74
5.74
5.74
858.93
858.93

1 kg.
1 kg.
1 kg.
1 cum
1 cum

123.98
189.42
34.44
103.07
17.18
7093.59

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
2759.04
9852.63
98.53
9951.16
1354.85
11306.01
0.00
0.00
11306.01
1130.60

Rs
Rs
3F
9951.16
827.71

4F
9951.16
1103.62

5F
9951.16
1379.52

10778.87
1467.54
12246.41
0.00
0.00
12246.41
1224.64

11054.78
1505.11
12559.89
0.00
0.00
12559.89
1255.99

11330.68
1542.67
12873.35
0.00
0.00
12873.35
1287.34

337269598.xlsx data-Bld-14-15

Page 1559 of 3205

10 mm thickness high glossy finish/ premium colours, set over


b, including neat cement slurry of honey like consistency spread @
of matching shade, including cost of all materials like cement, sand
m of work, including the cost and conveyance of all materials.

1747.00

1 sqm

18343.50

5.74
5.74
5.74
858.93
858.93

1 kg.
1 kg.
1 kg.
1 cum
1 cum

123.98
189.42
34.44
103.07
17.18
18811.59

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
2759.04
21570.63
215.71
21786.34
2966.21
24752.55
2475.26

Rs
Rs
3F
21786.34

4F
21786.34

5F
21786.34

827.71

1103.62

1379.52

22614.05
3078.90
25692.95
0.00
0.00
25692.95
2569.30

22889.96
3116.47
26006.43
0.00
0.00
26006.43
2600.64

23165.86
3154.03
26319.89
0.00
0.00
26319.89
2631.99

337269598.xlsx data-Bld-14-15

Page 1560 of 3205

thick 1st quality (Non skid type), set over base coat of cement
ment slurry of honey like consistency spread @ 3.3.kgs per sqm &
e, including cost of all materials like cement, sand water and tiles
ding the cost and conveyance of all materials. (For Toilets)

465.00

1 sqm

4882.50

5.74
5.74
29.00
858.93

1 kg.
1 kg.
1 kg.
1 cum

123.98
189.42
58.00
103.07
5356.97

504.00
450.00
384.00

1 Nos
1 Nos
1 Nos

483.84
1008.00
1267.20
2759.04
8116.01
81.16
8197.17
1116.04
9313.21
0.00
0.00
9313.21
931.32

Rs

Rs
Rs
3F
8197.17
827.71

4F
8197.17
1103.62

5F
8197.17
1379.52

9024.88
1228.74
10253.62
0.00
0.00
10253.62
1025.36

9300.79
1266.30
10567.09
0.00
0.00
10567.09
1056.71

9576.69
1303.87
10880.56
0.00
0.00
10880.56
1088.06

337269598.xlsx data-Bld-14-15

Page 1561 of 3205

other than black / premium colours slabs set over base coat of
eat cement slurry of honey like consistency spread @ 3.3.kgs per
ll depth, including cost of all materials like cement, sand water and
setc., complete for finished item of work,including the cost and

2947.00
5.74
5.74
5.74

1 sqm

30943.50

1 kg.
1 kg.
1 kg.

206.64
189.42
34.44

858.93

1 cum

171.79
31545.79

504.00
450.00
384.00

1 day
1 day
1 day

1512.00
450.00
3072.00
5034.00
36579.79
365.8
36945.59
5030.14
41975.73
0.00
0.00
41975.73
41975.73
4197.57

Rs
3F
36945.59
1510.20

4F
36945.59
2013.60

5F
36945.59
2517.00

38455.79
5235.76
43691.55
0.00
0.00
43691.55
4369.16

38959.19
5304.29
44263.48
0.00
0.00
44263.48
4426.35

39462.59
5372.83
44835.42
0.00
0.00
44835.42
4483.54

337269598.xlsx data-Bld-14-15

Page 1562 of 3205

o 20 mm (average) thick ( 0.610 M width of any length) set over


b, including neat cement slurry of honey like consistency spread @
shade to full depth, including cost of all materials like cement, sand
m of work, but excluding the cost of conveyance of all materials.

999.00

1 sqm

10489.50

5.74
5.74
5.74
858.93

1 kg.
1 kg.
1 kg.
1 cum

206.64
189.42
28.70
171.79
11086.05

504.00
450.00
384.00

1 day
1 day
1 day

1512.00
450.00
3072.00
5034.00
16120.05
161.2
16281.25
2216.69
18497.94
0.00
0.00
18497.94
18497.94
1849.79

Rs
3F
16281.25
1510.20

4F
16281.25
2013.60

5F
16281.25
2517.00

17791.45
2422.31
20213.76
0.00
0.00
20213.76
2021.38

18294.85
2490.84
20785.69
0.00
0.00
20785.69
2078.57

18798.25
2559.38
21357.63
0.00
0.00
21357.63
2135.76

337269598.xlsx data-Bld-14-15

Page 1563 of 3205

m (average) thick 0.305 M x 0.305 M set over base coat of cement


ment slurry of honey like consistency spread @ 3.3.kgs per sqm &
h, including cost of all materials like cement, sand water and tiles
excluding the cost of conveyance of all materials.

589.00

1 sqm

6184.50

5.74
5.74
5.74
858.93

1 kg.
1 kg.
1 kg.
1 cum

206.64
189.42
28.70
171.79
6781.05

504.00
450.00
384.00

1 day
1 day
1 day

1512.00
450.00
3072.00
5034.00
11815.05
118.15
11933.20
1624.71
13557.91
0.00
0.00
13557.91
13557.91
1355.79

Rs
3F
11933.20
1510.20

4F
11933.20
2013.60

5F
11933.20
2517.00

13443.40
1830.32
15273.72
0.00
0.00
15273.72
1527.37

13946.80
1898.86
15845.66
0.00
0.00
15845.66
1584.57

14450.20
1967.39
16417.59
0.00
0.00
16417.59
1641.76

337269598.xlsx data-Bld-14-15

Page 1564 of 3205

6mm to 12 mm size hard granite machine crushed metal laid over


1.50 m and finishing the top surface to required smoothness and
r etc., complete, including seigniorage charges, etc., complete for

1563.81
5.74
858.93

1 Cum
1 Kg
1 Cum

265.85
688.80
73.01
1027.66

504.00
450.00
384.00

1 day
1 day
1 day

630.00
27.00
1152.00
1809.00
2836.66
28.37
2865.03
390.07
3255.10
0.00
0.00
3255.10
325.51

Rs

Rs
Rs
3F
2865.03
542.70

4F
2865.03
723.60

5F
2865.03
904.50

3407.73
463.96
3871.69
0.00
0.00
3871.69
387.17

3588.63
488.59
4077.22
0.00
0.00
4077.22
407.72

3769.53
513.22
4282.75
0.00
0.00
4282.75
428.28

thick and plastered over with 12 mm thick in CM(1:3) and finishing


all materials like cement, metal, sand and water etc., complete,

3558.73
1231.12

1 cum
10 sqm

3558.73
1231.12

504.00
450.00
384.00

1 day
1 day
1 day

75.60
157.50
2073.60
70.97
7167.52
975.86
8143.38
0.00
337269598.xlsx data-Bld-14-15

Page 1565 of 3205


Rs

0.00
8143.38

337269598.xlsx data-Bld-14-15

Page 1566 of 3205

s with ceramic tiles 7.30 mm thick length equal to flooring stones,


pread at the rate of 3.30 kgs per sqm and jointed with white cement
rials like tiles, cement, sand and water etc., complete including
ance of all materials.

465.00
858.93
5.74
5.74
29.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

4882.50
103.07
330.62
189.42
174.00
5679.61

504.00
384.00

1 Nos
1 Nos

388.08
307.20
695.28
6374.89
867.94
7242.83
0.00
0.00
7242.83
724.28

Rs

Rs
Rs
3F
6374.89
208.58

4F
6374.89
278.11

5F
6374.89
347.64

6583.47
896.34
7479.81
0.00
0.00
7479.81
747.98

6653.00
905.81
7558.81
0.00
0.00
7558.81
755.88

6722.53
915.27
7637.80
0.00
0.00
7637.80
763.78

with 15 to 18 mm thick polished Shahabad stone length equal to


ike consistency spread at the rate of 3.30 kgs per sqm and jointed
of all materials like Shahabad stone, cement, sand and water etc.,
the cost and conveyance of all materials.

1654.00
858.93
5.74
5.74

10 sqm
1 cum
1 kgs
1 kgs

1819.40
103.07
330.62
189.42
2442.51

504.00
450.00
384.00

1 Nos
1 Nos
1 Nos

483.84
1008.00
1190.40
337269598.xlsx data-Bld-14-15

Page 1567 of 3205

Rs

Rs
Rs

2682.24
5124.75
51.25
5176.00
704.71
5880.71
0.00
0.00
5880.71
588.07

337269598.xlsx data-Bld-14-15

Page 1568 of 3205


3F
5176.00
804.67

4F
5176.00
1072.90

5F
5176.00
1341.12

5980.67
814.27
6794.94
0.00
0.00
6794.94
679.49

6248.90
850.79
7099.69
0.00
0.00
7099.69
709.97

6517.12
887.31
7404.43
0.00
0.00
7404.43
740.44

ps with 8 mm thick mirror polished granite tiles length equal to


ike consistency spread at the rate of 3.30 kgs per sqm and jointed
st of all materials like tiles, cement, sand and water etc., complete

999.00
858.93
5.74
5.74
29.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

10489.50
103.07
330.62
189.42
145.00
11257.61

504.00
450.00
384.00

1 day
1 day
1 day

1058.4
360
1881.6
3300.00
14557.61
145.58
14703.19
2001.84
16705.03
0.00
0.00
16705.03
16705.03
1670.50

Rs
3F
14703.19
990.00

4F
14703.19
1320.00

5F
14703.19
1650.00

15693.19
2136.63
17829.82
0.00
0.00
17829.82
1782.98

16023.19
2181.56
18204.75
0.00
0.00
18204.75
1820.48

16353.19
2226.49
18579.68
0.00
0.00
18579.68
1857.97

337269598.xlsx data-Bld-14-15

Page 1569 of 3205

s with vitrified tiles length equal to flooring stones, set over base
ate of 3.30 kgs per sqm and jointed with white cement paste mixed
ent, sand and water etc., complete including seigniorage charges,

631.00
858.93
5.74
5.74
29.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

6625.50
103.07
198.37
189.42
58.00
7174.36

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008
1267.2
2759.04
9933.40
99.33
10032.73
1365.96
11398.69
0
0
11398.69
11398.69
1139.87

Rs
3F
10032.73
827.71

4F
10032.73
1103.62

5F
10032.73
1379.52

10860.44
1478.65
12339.09
0.00
0.00
12339.09
1233.91

11136.35
1516.21
12652.56
0.00
0.00
12652.56
1265.26

11412.25
1553.78
12966.03
0.00
0.00
12966.03
1296.60

wall tiles of any size and of 5 to 7 mm thick set over a base coat
ead at the rate of 3.30 Kg of cement per One Square Meter and
t and conveyance of all materials like cement, sand, water, flooring
mortar, laying, jointing, curing, lift charges etc., complete for finished

348.00
858.93
5.74
5.74
29.00

1 Sqm
1 cum
1 kgs
1 kgs
1 kgs

504.00

1 day

3654.00
103.07
330.62
189.42
174.00
4451.11
388.08
337269598.xlsx data-Bld-14-15

Page 1570 of 3205


384.00

1 day

Rs
Rs

307.20
695.28
5146.39
51.46
5197.85
707.69
5905.54
0.00
0.00
5905.54
590.55

337269598.xlsx data-Bld-14-15

Page 1571 of 3205


3F
5197.85
208.58

4F
5197.85
278.11

5F
5197.85
347.64

5406.43
736.09
6142.52
0.00
0.00
6142.52
614.25

5475.96
745.55
6221.51
0.00
0.00
6221.51
622.15

5545.49
755.02
6300.51
0.00
0.00
6300.51
630.05

NG
h CM(1:3), 20mm thick with 1kg of water proof compound per bag
rges, excluding conveyance charges of materials and including all
d thread lining, curing, rounding off junctions of wall and slab etc,,

3733.88
52.00

1 Cum
1 Kg

784.11
104.00
888.11

504.00
450.00
384.00

1 day
1 day
1 day

332.64
693.00
1420.80
2446.44
3334.55
454
3788.55
0.00
0.00
3788.55
378.86

Rs

Rs
Rs
3F
3334.55
733.93

4F
3334.55
978.58

5F
3334.55
1223.22

4068.48
553.92
4622.40
0.00
0.00
4622.40
462.24

4313.13
587.23
4900.36
0.00
0.00
4900.36
490.04

4557.77
620.54
5178.31
0.00
0.00
5178.31
517.83

337269598.xlsx data-Bld-14-15

Page 1572 of 3205

bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with
nt on over lapping of sheets complete (upto a pitch of 600) and
ses & cost of conveyance of all materials

56.00

1 kgs

8668.80

5.00

1 nos

239.57

9.00

1 nos

395.12

0.30

1 nos

27.54

0.25
175.00
487.00

1 nos
1 litre
1 litre

22.95
24.00
98.98

384.00
384.00

1 day
1 day

322.60
349.66

588.00
384.00

1 day
1 day

36.01
23.52

588.00
384.00

1 day
1 day

80.63
52.66
10342.04
1408.07
11750.11
0.00
0.00
11750.11
1175.01
117.50

Rs

Rs
Rs

ng with G.I J bolts & nuts 8 mm dia G.I plain washers complete
ost of purlins, rafters, trusses & cost of conveyance of all materials

207.00

1 Sqm

2339.10

5.00
1.00
0.25

1 nos
1 nos
1 nos

110.13
22.03
5.51

384.00
384.00

1 day
1 day

165.97
207.55
10.00
10.00

2870.29
390.79
337269598.xlsx data-Bld-14-15

Page 1573 of 3205

Rs
Rs

3261.08
0.00
0.00
3261.08
326.11

337269598.xlsx data-Bld-14-15

Page 1574 of 3205

t Primer Water base Exterior Gr-2 after thoroughly brushing the


materials, labour charges and incidental such as scaffolding, lift
80.00
504.00
450.00

1 Kg
1 day
1 day

Rs

80.00
105.84
220.50
406.34
2.03
408.37
55.6
463.97
0.00
0.00
463.97
463.97

an even shade after thoroughly brushing the surface to remove all


es and incidental such as scaffolding, lift charges etc., complete for

29.00

1 Kg

34.80
10.00

504.00
384.00

1 day
1 day

55.44
84.48
184.72
0.92
185.64
25.27
210.91
0.00
0.00
210.91
210.91

Rs

an even shade after thoroughly brushing the surface to remove all


es and incidental such as scaffolding, lift charges etc., complete for

29.00

1 Kg

58.00
5.00

504.00
384.00

1 day
1 day

105.84
122.88
291.72
2.92
294.64
40.12
334.76
0.00
0.00
334.76
334.76

Rs

Rs

337269598.xlsx data-Bld-14-15

Page 1575 of 3205

e an even shade after thoroughly brushing the surface to remove all


es and incidental such as scaffolding, lift charges etc., complete for

Rs

Rs

294.64
147.32
441.96
60.17
502.13
0.00
0.00
502.13

337269598.xlsx data-Bld-14-15

Page 1576 of 3205

er Proof Cement Paint over Priming Coat, One Coat (All Colours)
ve all dirt and remains of loose powdered materials, including cost
etc. complete for finished item of work as per SS 912.

1185.00
576.00
450.00
384.00

25 Kg
1 day
1 day
1 day

Rs

184.72
94.80
51.84
94.50
576.00
10.02
1011.88
137.77
1149.65
0.00
0.00
1149.65

sable distemper of approved brand and shade over a base coat of


thourughly brushing the surface to remove all dirt and remains of
all operational, incidental, labour charges etc. complete for finished

144.00
576.00
450.00
87.00
576.00
450.00

1 Kg
1 day
1 day
1 Kg
1 day
1 day
Rs

Rs

72.00
46.08
85.50
147.90
207.36
378.00
936.84
127.55
1064.39
0.00
0.00
1064.39

ood Work, Old Wood Work & New Iron Work including cost and
bour charges etc., complete for finished item of work. (APSS No.
230.00

1 Ltr

161.00

576.00
450.00

1 day.
1 day.

120.96
220.50
0.00
502.46
68.41
570.87
0.00
0.00
570.87

Rs

Rs

337269598.xlsx data-Bld-14-15

Page 1577 of 3205

ATORS

rlocked together through their entire length and jointed together at


re MS B class pipe with brackets, plates, guide channels, stoppers,
ations including cost of hood cover and springs complete, painted
r finished item of work as per special spn: 1108
2500.00

1 Sqm

Rs

2500.00
350.00
2850.00
0.00
0.00
2850.00

0 x10x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm


gate with 65x65mmx8mm MS Angle and middle guide rail at site
sts, bolts, nuts, rivets, locking arrangements, stoppers, handles, all
or finished item of work as per special spn 1105
2503.00

1 Sqm

Rs

2503.00
350.42
2853.42
0.00
0.00
2853.42

TIAL BUILDINGS WITH GRILL PROVISION) Providing and Fixing


ed as per IS 277 with Zinc of 120 GSM). Primer coated with epoxy
d back coated with 5-7 microns thick alkyd backer. Section for outer
ould be of 47x20mm and Fixed glass beading section should be of
ion for Guard bars/Grills. The sections are to be cut to length metre
e, seccolor stay, 2 nos. of Stainless Steel heavy duty Pivot hinges
lass. Rubber Gaskets are provided all around the glass. The above
Including 10mm Square guard bars with 6 (152.4mm) pitch etc.,

er frame section size of 48x50mm shutter frame section size of


5303.00

1 Sqm

5303.00
742.42
6045.42

Rs

0.00
0.00
6045.42

r frame section size of 48x50mm. Shutter frame section size of


4673.00

1 Sqm

Rs

4673.00
654.22
5327.22
0.00
0.00
5327.22

337269598.xlsx data-Bld-14-15

Page 1578 of 3205

DINGS WITH GRILL & FLYMESH PROVISION) Providing & Fixing


ed as per IS 277 with zinc of 150 GSM). Primer coated with epoxy
d back coated with 5-7 microns thick alkyd backer. Section for outer
ss beading section should be of 12x12mm and section for shutters
rs, fly mesh and a 20mm provision for guard bars/grills. Fly mesh
ith corner bracket. Centre mullions are to be fixed with mullion cap,
ot hinges shall be provided per Shutter. The windows should be
e). Rubber Gaskets are provided all around the glass. The above
ws. Including 10mm Square guard bars with 6 (152.4mm) pitch ,

r frame section size of 72x50mm. Shutter frame section size of


6300.00

1 Sqm

6300.00
882.00
7182.00

Rs

0.00
0.00
7182.00

d from Roll formed sections made of galvanized Steel colour


th zinc of 120 GM/Sq.mtr) with total coated thickness of 0.60mm.
of 12-16 microns thick and back coated with Alkyd backer of 5-7
for external frame bottom should be of 79x44mm, external frame
(Stainless Steel). Section for shutter should be of 26x30mm. The
and external frame made of glass filled nylon. Gaskets are to be
h, joined and assembled by means of corner bracket. The above
ckets & screws including 10mm square guard bars with 6 pitch

5864.00

1 Sqm

Rs

5864.00
820.96
6684.96
0.00
0.00
6684.96

RY MADE SOLID SINGLE SIDE PRELAM PANEL PVC DOOR


9mmX19mm for stiles, and 15mmX15mm for top and bottom rails.
. Frame covered with 5mm thick heat moulded Rajshri single side
e side prelim Pac sheets shall be for the top, bottom and lock rails.
e front (prelam side) stiles and rails (which should have a 5mm 45
ld have a 10mm 900 bent portion as beading ) using 2nos. 15mm
adings are to be joined to the panel using solvent cement etc. an
nnel using Pac solvent cement adhesive and 10mm(5mmX2) thick,
as per direction of Engineer in-Charge, manufacture specification

2450.00

1 Sqm

Rs

2450.00
343.00
2793.00
0.00
0.00
2793.00
337269598.xlsx data-Bld-14-15

Page 1579 of 3205

nded Particle Board as per IS 14276 (Bison Panel or Equivalent) :


(Base steel as per IS277 with zinc of 120 Gms/sqm) colour coated
at of 5-7 microns thick, finish paint with polyester paint of 12-16
3. Overall size of frame section should be of 50mm x 50mm. With
d shutter (Bison Panel or Equivalent) Single Leaf with all round
coated cold rolled steel profiles with 16mm thick Cement Bonded
4.8mm) intervals. The cost inclusive of MS nickel coated Aldrop of
veyance of all materials at site and applying one coat primer , one

3218.00

1 Sqm

Rs

3218.00
450.52
3668.52
0.00
0.00
3668.52

337269598.xlsx data-Bld-14-15

Page 1580 of 3205

steel powder coated (base steel as per IS 513, galvanised as per


ated with pure polyester powder of 50-60 microns thick with total
f 38 mm to accommodate 35 mm thick door shutter, with groove to
h, and joined by way of welding, each frame provided with: a) 2mm
or double shutter. b) CRCA electroplates stiffeners of 6 Nos. 3 in
h split end tail. d) Nylon Aldrop Receiver 1 No. for single shutter

703.00

1 Rmt

703
98.42
801.42
0
0
801.42
801.45

d Steel (Base Steel as per IS 513, D quality, galvanized as per IS


yester powder upto 50-60 microns thick with total coated thickness
Frame for Two Tracks with Grill provision size of 90 mm x 50 mm
of 58 mm x 36 mm and the outer Frame with two integrated guide
acilitates with a water drain outlet component made of PVC and the
PDM weathering seal resistant accessories and handle made of
kets including installation of window system at site using anchor
ll materials accessories, labour charges, and erection at site with

5880.00

1 Sqm

5880

823.200
6703.20

se steel as per IS 513 of 0.80 mm thick galvanized as


microns thick and section for outer frame of 80 x 45 mm,
er frame and mullions to have rebate for glazed shutter with a
bracket, centre mullion fixed with mullion cap,1 No. of High
earing butt Hinges provided per shutter and windows fitted with 4
/masonry wall by means of self expanding screws, Including
of work.

4177.00

1 Sqm

4177

584.780
4761.78

M with all round U section size of 20mm x 18mm x 20mm made


ating two shutter with 30mm x 20mm x 30mm stepped lipping with
coated 250mm long aldrops 2nos, MS powder coated 125mm long
t site labour charges etc., complete finished item of work.

2593

1 Sqm

2593
337269598.xlsx data-Bld-14-15

Page 1581 of 3205


363.02
2956.02
0
0
2956.02

337269598.xlsx data-Bld-14-15

Page 1582 of 3205

M with all round section U size of mm thick galvanized pre-painted


m) intervals. The cost inclusive of MS Nickel coated 250mm long
ercoated 125mm long grip handle, 1 nos M.S.P.C. Door stopper.
d item of work.
2000

1 Sqm

2000
280
2280
0
0
2280.00

with teak veneer on one face and commercial ply on another face
2 nos. 125 mm lond Aluminium door handle, 1 no. 250 mm long
opper including cost and conveyance of all material and all fixtures
1504.00

1 Sqm

1504.00

324.00

1 Sqm

324.00

324.00
176.00
136.00

1 each
1 each

64.80
176.00
272.00

165.00

1 each

165.00

174.00
61.00

1 each
1 each

174.00
61.00
2740.80
383.71
3124.51
0
0
3124.51

made of Skin pass galvanized Iron sheet conforming to Base


20 grams / Sq.Mtr with powder coating of thickness 60-65
ebate profile of size 100 mm X 58 mm and filled with in-fill
nized Iron Sheet formed to provide a 46 mm thick fully flush,
Honeycomb Kraft Paper and coated with polyester powders of
kness 60 65 microns and are coated with Zinc Phosphate
int of Aliphatic Grade providing high levels of scratch
Circular, Square or Rectangular shapes, Stainless Steel Ball
2x76x3mm thick).Mortise Sash Lock with Lever Handles,
s

11139.00

1 Sqm

11139.00
1559.46
12698.46
0
0
12698.46

337269598.xlsx data-Bld-14-15

Page 1583 of 3205

de of Pre-painted Steel / Powder coated (Base steel as per IS 513


ess of 0.72 mm and the glass holding section made of 304 grade
he colour coated steel powder coated sections as per the design
epoxy primer of 5 7 microns thick, finish painted with a polyester
coated with pure polyester powder up to 50-60 microns thick and
me horizontal section, stiffener section of 48 mm x 98 mm x 1 mm,
37 mm & 37 mm x 18 mm including fixing 5mm thick Ocean Blue
to horizontal, vertical to slab, to fix verticals at top & bottom as per
silicon sealant including fixing in concrete/masonry wall with selfr charges, incidental charges, cost of all consumables etc. and

6300

1 Sqm

6300
882
7182
0
0
7182.00

Ventilator including all labour charges etc., complete


375.00

1 Sqm

375.00

Rs

52.50
427.50

artment) 3.58 Kg/Sqm.including cost and conveyance of all material


1112.00

1 Sqm

1112.00

Rs

155.68
1267.68
0.00
0.00
1267.68

Closer (IS: 3564) with double speed adjustment with necessary


1136.00

1 No

1136.00

Rs

159.04
1295.04
0.00
0.00
1295.04

SONLAM and 5.50 mm thick plain glass to full height. Using with
d aluminum sections anodized to 12 to 15 microns and of sections
h clip beading on both sides including fixing the frame to pillars by
directed during execution
3207.00

1 No

3207.00

Rs

448.98
3655.98
0.00
0.00
3655.98
337269598.xlsx data-Bld-14-15

Page 1584 of 3205

337269598.xlsx data-Bld-14-15

Page 1585 of 3205

r pre-painted steel (base steel as per IS 513 of 0.58 mm thick D


of 5-7 microns thick, finish painted with a polyester paint of 12-16
tter should be 46x46mm, section for mullion should be 46x70mm,
ail and Kick Rail) of size should be 23x130mm. The partition
bottom, and remaining height with 5mm thick plain glass With Ethyl
re joined with corner bracket Centre mullions are to be fixed using
kets made of CRCA with zinc phosphate. Mullion caps made of
means of self expanding screws, and complete for finished item of

be of 46x70mm, fixed beading should be of 18x25mm, section for


m
5200.00

1 No

5200.00

Rs

728.00
5928.00
0.00
0.00
5928.00

S-FLC-4.6 as per India Gypsum) in size 600 mm x 600 mm using


mm x 1195 mm conforming to IS 2095 - 1982 fixing to Gyp steel
r of ceiling screw fixed to brick work/ partition at 610 mm c/c and
rom soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and
ith galvanised spring steel level clip of PVC unversal holding clips
5 mm x 595 mm or 595 mm x 1195 mm and finishing two coats of

255.00

1 sqm

255.48

38.00

1 RM

15.20

50.00

1 RM

80.00

50.00

1 RM

80.00

11.00

1 RM

14.08

2.00
2.00
3.00
133

1 Nos
1 Nos
1 Nos
1 lits

2.56
2.56
16.08
19.95

420.00
384.00
576.00
450.00
384.00
384.00
384.00

1 day
1 day
1 day
1 day
1 day
1 day
1 day

168.00
153.60
46.08
36.00
15.36
15.36
92.16

117.00

1 Hrs

37.44

337269598.xlsx data-Bld-14-15

Page 1586 of 3205


108.00

1 Hrs

34.56

Rs

1084.47
10.84
1095.31
153.34
1248.65
0.00
0.00
1248.65
1248.65

337269598.xlsx data-Bld-14-15

Page 1587 of 3205

15 mm thick Arm strong false ceiling system manufactured by M/s


th pre-coated capping, main Tee of size 24 x 32 mm at every 1200
nd sub-cross tee of size 24 mm x 25 mm at 1200 mm c/c and wall
at every 1200 mm c/c in both directions using 2.0 mm thick preber Board manufactured by M/s Arm Strong World Industries Ltd.,
materials and labour charges such as cutting , fixing of standing of

479.00

1 sqm

479.91

37.00

1 RM

14.80

47.00

1 RM

75.20

43.00

1 RM

68.80

9.00
3.00

1 RM
1 Nos

11.52
3.84

420.00
384.00
576.00
450.00
384.00
384.00
384.00

1 day
1 day
1 day
1 day
1 day
1 day
1 day

168.00
153.60
46.08
36.00
15.36
15.36
92.16

117.00

1 Hrs

37.44

108.00

1 Hrs

34.56

Rs

1252.63
12.53
1265.16
177.12
1442.28
0.00
0.00
1442.28
1442.30

337269598.xlsx data-Bld-14-15

Page 1588 of 3205

level 600 mm x 600 mm using 15 mm/ 19 mm thick Thermocole


cross tee of size 24 x 24.5 mm at every 600 mm c/c and anodised
s suspended at every 1200 mm c/c in both directions using 2.0 mm
als and labour charges such as cutting , fixing of standing of frame

43.00

1 sqm

43.08

24.00
32.00

1 RM
1 RM

9.60
102.40

9.00

1 Nos

11.52

2.00

1 Nos

2.56

420.00
384.00
576.00
450.00
384.00

1 day
1 day
1 day
1 day
1 day

151.20
138.24
0.00
0.00
7.68

384.00
384.00

1 day
1 day

15.36
76.80

117.00

1 Hrs

18.72

108.00

1 Hrs

34.56

Rs

611.72
6.12
617.84
86.50
704.34
704.35

NPANEL with frame work made of GI stud section of size 48mm x


internals horizontally fixed to the wall by means of self expansion
placed at every 300 mm intervals leaving 3mm gap between two
inish and cost & conveyance of all materials, labor charges etc.

1280.00

1.00 Sqm

Rs

1280.00
179.20
1459.20
0.00
0.00
1459.20
1459.20

ll material and all labour


3.56 chages etc complete.
0.18
3.74
45.00
length
1.00

1 Kg

168.21

0.150 Sqm
337269598.xlsx data-Bld-14-15

Page 1589 of 3205


502.46

10 Sqm

Rs

7.54
52.73
228.48
228.50

337269598.xlsx data-Bld-14-15

Page 1590 of 3205

0mm MS square bars horizontally at 125mm centre to centre and


ach side) duly making cutting brick masonry, fixing and making to
conveyance of all materials ,cutting, bending, welding including all

1.50 =

2.25 Sqm

3.00
3.00
2.00
8.00 Rmt
1.20 Kg/Rmt

9.60 Kgs

8.00 Rmt
18.00 Rmt
26.00 Rmt
0.78 Kg/Rmt

20.28 Kgs
29.88 Kgs

38.00
34.00
22.00

1 Kg
1 Kg
1 Kg

364.80
689.52
657.36

657.36
4.00

1 Kg

131.47
119.52

119.52
Rs.
Rs.

23.90
1986.57
882.92
66.48

rcharges for lifting and fixing the stone in position at all levels:
90.00

1 Sqm

94.50

80.00

1 Rmt

107.20

Rs

18.9
220.60
30.03
250.63

bar nibs as per design in plate No. 22/2/2. (earth work & concrete to

370.00

1m

484.70

450.00
504.00
384.00

1 day
1 day
1 day

45.00
201.60
153.60
337269598.xlsx data-Bld-14-15

Page 1591 of 3205

Rs
Rs

0.00
8.85
893.75
121.68
1015.43
0.00
0.00
1015.43
812.34
812.34

337269598.xlsx data-Bld-14-15

Page 1592 of 3205


conveyance of all material and all labour chages etc complete.
3.56 Kg/Rmt
0.18
3.74
43.00
length
1.00
570.87

1 Kg

160.73

0.150 Sqm
10 Sqm
Rs

8.56
50.79
220.08

deformed steel Anchor rods with 0.75m length driven in to the hole
f all materials, machinary, labour, drilling and cleaning hole, driving
s.

43.00

1 Kg

1019.10

140.00

1 Nos

1400.00

88.00

1 Nos

880.00

444.00
450.00
384.00

1 day
1 day
1 day

222.00
225.00
384.00
4130.10
413.01
413.05

Rs
Rs
Rs

62 Type I) weighing 9.38 Kg per 100 metres (min.), Straining and


galvanised mild steel wire, stapples or steel pins, etc., as directed
tely).

80.00

1 Rmt

750.40

75.04

444.00
450.00
384.00

1 No
1 No
1 No

66.60
67.50
115.20
0.00
2.49
1077.23
150.81
1228.04
0.00
337269598.xlsx data-Bld-14-15

Page 1593 of 3205

Rs

0.00
1228.04
12.28
12.28

337269598.xlsx data-Bld-14-15

Page 1594 of 3205

S 226 and IS 808 as directed by the departmental officers including


ng the angles with two coats of Synthetic anamel painting including
ound wall after raising the wall
43.00

1 Kg

193.50

24.00

1 Kg

108.00

4.80

1 Kg

21.60

10 Sqm

6.03
329.13

502.46

Rs

, Heavy Beams and Girders including cost of welding rods, power


18.00

1 Kg

Rs

18.00
3.60
21.60
3.02
24.62
0.00
0.00
24.62

s and Girders erecting in position and fixing by using chain pulley


16.00

1 Kg

Rs

16.00
3.20
19.20
2.69
21.89
0.00
0.00
21.89

of all material , labour charges for fabrication and fixing in postion


43.00
0.15
21.60
19.20

1 Kg
1 Kg
1 Kg
1 Kg

Rs

43.00
0.15
21.60
19.20
83.95
11.75
95.70
0.00
0.00
95.70

of all material , labour charges for fabrication and fixing in postion

337269598.xlsx data-Bld-14-15

Page 1595 of 3205


309.00

1 Kg

309.00

101.00

1 Kg

101.00

4.00

1 Kg

4.00
414.00
Rs

57.96
471.96

337269598.xlsx data-Bld-14-15

Page 1596 of 3205

size 40x40x6 mm with 10 mm square rod at bottom for tie rod


20x5 mm MS Flat 200 mm long, including c/c of all materials and
5.90
3.50
0.78
0.78
Kgs
Nos.
Kg
kg

Rmt

20.65 Kgs
1.08 Kgs
1.40 Kgs
23.13 Kgs
43.00 Kg
31.00 each
24.00 Kg
4.80 Kg
Each
Rate per
1 Rmt

994.61
93.00
555.13
111.03
1753.76
297.20

type with commercial ply on both faces with 1no. 300 mm long
g door latch 1 No. door stopper ( all fixturs MS Powder coated )

1.845 Sqm
2205.00
164.00
101.00
92.00
144.00
354.00

1 Sqmt
1 each
1 each
1 each
1 each
1 Sqmt
Rate per

4068.23
164.00
202.00
92.00
144.00
653.13
5323.40
2885.30

Each
1 Sqm

y fixed post and MS Window Section of E Z 7 with lugs, glazing


ars @ 10cm c/c as per approved design with cost and conveyance
xtures like MS Z shaped hold fast, lugs, tower bolts, etc., complete

Area

1.44 Sqm

2.40
2.40
0.80
5.60 Rmt
2.40
4.80
7.20 Rmt
12.80 Rmt
1.20 Rmt
14.40 Rmt
1.44 Sqm
1.03 Kg/Rmt

13.20 Kgs

1.15 Kg/Rmt
0.78 Kg/Rmt

1.40 Kgs
11.20 Kgs

337269598.xlsx data-Bld-14-15

Page 1597 of 3205


43.00
43.00
31.00
309.00
265.20
24.00
4.80

1 kg
1 kg
1 each
1 sqm
1 sqm
1 Kg
1 Kg
Rate per

Each
1 Sqm

627.80
481.60
62.00
444.96
381.89
619.20
123.84
2741.29
1903.70

337269598.xlsx data-Bld-14-15

Page 1598 of 3205

25mm long hinges and shutter with 10 mm thick plaing cement


alent ) including cost and conveyance of all materials and labour

1.5375 Sqm
0.78 Kg/Rmt

1.10
43.00
24.00
4.80

0.936

8.69 Kgs
1.00
1.00
1.00

Kgs

Kg
Kg
Kg

373.67
208.56
41.71

291.00

1.00

Sqm

447.41

31.00
92.00
354.00

1.00
1.00
1.00

Nos
Nos
Sqm

62.00
184.00
544.28

Each
Rate per

1 Sqm

1861.63
1210.80

tank with Double layer approved brand & manufacture with cover
w pipes but without fittings & base support for tanks
6.00
1.00
14%

1 Kg

6.00
0.40
6.40
0.90
7.30
0.00
0.00
7.30

337269598.xlsx data-Bld-14-15

Page 1599 of 3205

Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c,


m centre to centre including fixing with 4 Nos of MS Z holdfasts (2
eatly and painting gate with one coat of red oxide primer including
g, bending, welding including all operational charges and all labour

1.50 =

2.625 Sqm

4.00
3.00
2.00
9.00 Rmt
4.00 Kg/Rmt
3.00
2.60 Kg/Rmt

36.00 Kgs
7.80 Kgs
43.80 Kgs

21.00 Rmt
21.00 Rmt
1.13 Kg/Rmt
0.450 Sqm
15.70 Kg/Sqm

43.00
43.00
48.00
20.00
4.00
502.46
84.00
164.00

23.73 Kgs
7.07 Kgs
74.60 Kgs
1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
10 Sqm
1 No
1 No

14%

Rs.

1883.40
1020.39
339.12
1491.90
298.38
131.90
84.00
164.00
5249.09
734.87
5983.96
0.00
0.00
5983.96
2280.00
5983.96
80.00

337269598.xlsx data-Bld-14-15

Page 1600 of 3205


Doors, Windows etc, including cost and conveyance of all material
43.00

1 Kg

43.00

25.00
24.00
4.80

1000 Kg
1 Kg
1 Kg

0.03
24.00
4.80
71.83
10.06
81.89
0.00
0.00
81.89

Rs

rial and labour charges etc., complete for fixing it to the septic tank
383.00

3 Rmt

127.67

127.67
15.00
14.00
50.00

1 Rmt
1 Each
1 Each
1 Rmt

1915.05
15.00
140.00
750.00

150.00
2970.05
198.00
27.72
3195.77
0.00
0.00
3195.77

using PHOENIX or equivalent high strength Cement Concrete


k shall be for colour pigmentation with imported colours and white
al Specification Clause 1504 MORD

384.00
450.00

1 day
1 day

6912
3600

630.00

1 hour

1260

649.00

1 sqm

146025

254.77
641.93

1m
1 cum

30572.4
4641.15

103.00

1 kl

309
193319.55
27064.74
220384.29
337269598.xlsx data-Bld-14-15

Page 1601 of 3205


0
0
220384.29
979.49

337269598.xlsx data-Bld-14-15

Page 1602 of 3205

mm x 150 mm or any other shape can also be used and their cost

4966.26
4966.26

1 Cum

223.48
31.29
254.77
0
0
254.77

or with 30mm thick flush shutter with bondwood solid Block Board
fittings like hinges, tower bolts and locking arrangement etc., and

435.00
1260.00

1 No
1 Sqmt

435.00
1874.88

136.00
81.00
92.00
54.00
213.00
54.00
223.00

1 No
100 No
1 No
100 No
1 No
100 No
1 No

272.00
12.96
184.00
8.64
213.00
2.16
223.00

12.00

1 set

72.00

420.00

1 cum

0.38

10.00

1 set

80.00

324.00

1 Sqmt

482.12

482.12

1 Sqmt

96.43
3956.57
553.92
4510.49

337269598.xlsx data-Bld-14-15

Page 1603 of 3205

or with 30mm thick flush shutter with bondwood solid Block Board
fittings like hinges, tower bolts and locking arrangement etc., and

420.00
1260.00

1 No

420.00

1 Sqmt

1512.00

136.00
81.00
92.00
54.00
213.00
54.00
223.00

1 No
100 No
1 No
100 No
1 No
100 No
1 No

272.00
12.96
92.00
4.32
426.00
4.32
223.00

12.00

1 set

72.00

420.00

1 cum

0.29

10.00

1 set

60.00

324.00

1 Sqmt

388.80

482.12

1 Sqmt

96.43
3584.12
501.78
4085.90

ng c/c of all materials like cement, sand, bricks, water etc., to site,
and labour charges such as mixing cement mortar, constructing
ize of Hallow Birck (16"X8"X6"). (APSS No. 501 & 504).
12.25
1231.12
0.00
0.00
0.00

1 Nos
1 cu.m.
1 Each
1 Each
1 Each
Total

906.50
184.67
0.00
0.00
0.00
1091.17
152.76
1243.93

Rs

1243.95

nd placing 2nos. of 6mm dia MS bars embedded in every 3rd layer


r applicable including c/c of all materials like cement, sand, bricks,
al, incidental and labour charges such as mixing cement mortar,
and conveyance of steel and its fabrication charges complete for

8.25
1231.12
0.00
0.00

1 Nos
1 cu.m.
Each
Each

940.50
160.05
0.00
0.00
337269598.xlsx data-Bld-14-15

Page 1604 of 3205


0.00

Each
Total

Rs

0.00
0.00
1100.55
154.08
1254.63
1254.65

337269598.xlsx data-Bld-14-15

Page 1605 of 3205

PUBLIC HEALTH -DATA- 2012-13


Statement Showing Comparative Data
Drinking Water Supply Schemes (Public Health) with
Index-code

for th
20%

S No

Description

Unit

Sub Analysis
Lowering C.I. Pipes, A class and specials with s/s ends carefully into trench and
laying them true to alignment and gradient including all sundries but excluding cost
and conveyance of pipes from source of supply. (Reference to specifications. BIS
No.3114/94)

Common Data

1
PHE-LCIS-1

Assumtion 10 m
200 mm dia CI pipes 5m long (class A)
Weight = 2 x 257 kgs = 514 kgs = 5.14 quintal
(a) LABOUR:
Plumber 1st class
Plumber 2nd class
Man mazdoor
(b) Cost for 10 metres
Rate per metre = b/10
Rate for 1 kg = b/514
Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully
into trenches and laying them true to alignment and gradient including all sundries
but excluding cost and conveyance of pipes from source of supply (Ref to
specifications. BIS No.3114/1994)

day
day
day

Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be
as per sub-analysis made for 200 mm dia CI Pipes S/s ends.

ii

iii

iv

Details of cost for 5m


80 mm dia pipe
Weight of 5m length = (79 +85.5 + 92)/3 = 85.5 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
100 mm dia pipe
Weight of 5m length = (100+109+117)/3 = 108.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
125 mm dia pipe
Weight of 5m length = (130+141+153)/3 = 141.33 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
150mm dia pipe
Weight of 5m length = (162+178+191)/3 = 177 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
PH data

kgs

kgs

kgs

kgs

Page 1606 of 3205

Rate per metre = c/5

PH data

Page 1607 of 3205

vi

vii

viii

ix

xi

xii

xiii

xiv

200 mm dia pipe


Weight of 5m length = (237+257+278)/3 = 257.33 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
250 mm dia pipe
Weight of 5m length = (319+348+376)/3 = 347.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
300 mm dia pipe
Weight of 5m length = (412+450+487)/3 = 449.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
350 mm dia pipe
Weight of 5m length =(519+563+610)/3=564
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
400 mm dia pipe
Weight of 5m length =(631+690+744)/3=688.33
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
450mm dia pipe s/s for 5m
Weight of 5m length =(761+836+901)/3=832.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
500 mm dia pipe
Weight of 5m length =(892+971+1049)/3=970.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
600 mm dia pipe
Weight of 5m length =(1188+1296+1404)/3=1296
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
700mm dia pipe s/s for 5m
Weight of 5m length =(1533+1675+1808)/3=1672
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
750 mm dia pipe
Weight of 5m length =(1718+1876+2029)/3=1874.33
(a) Labour charges for laying
PH data

kgs

kgs

kgs

kgs

kgs

kgs

kgs

kgs

kgs

kgs

Page 1608 of 3205

(b) Overheads & Contractors Profit


(c) Cost for 5 metres = a+b
Rate per metre = c/5

PH data

Page 1609 of 3205

xv

xvi

xvii

2
PHE-LCIF-2

800 mm dia pipe


Weight of 5m length =(1922+2093+2263)/3=2092.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
900 mm dia pipe
Weight of 5m length =(2342+2544+2766)/3=2554
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
1000 mm dia pipe
Weight of 5m length =(2814+3072+3318)/3=3068
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with flanged ends
carefully into trench and laying them true to alignment and gradient including all
sundries but excluding cost and conveyance of pipes from source of supply.
(Reference to specifications. BIS No.3114/1994)

kgs

kgs

kgs

Note : The cost of lowering and laying is taken as per sub analysis made for S/S
ends.
i

ii

iii

iv

vi

Details of cost for 10m


80 mm dia pipe
Weight of 1m length = 19.8+(2x3.7)/2.75 = 22.49 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
100 mm dia pipe
Weight of 1m length = 25.4+(2x4.2)/2.75 = 28.45 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
125 mm dia pipe
Weight of 1m length = 33.1+(2x5.3)/2.75 = 36.95 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
150mm dia pipe
Weight of 1m length = 41.6+(2x6.7)/2.75 = 46.47 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
200 mm dia pipe
Weight of 1m length = 60.1+(2x9.3)/2.75 = 66.86 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
250 mm dia pipe
Weight of 1m length = 81.8+(2x12)/2.75 = 90.53 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
PH data

kgs

kgs

kgs

kgs

kgs

kgs

Page 1610 of 3205

vii

300 mm dia pipe


Weight of 1m length = 106.1+(2x14.8)/2.75 = 116.86 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre

PH data

kgs

Page 1611 of 3205

viii

ix

xi

xii

xiii

xiv

2A
PHE-LCIF-2A

350 mm dia pipe


Weight of 1m length = 133.5+(2x19)/2.75 = 147.32 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
400 mm dia pipe
Weight of 1m length = 162.6+(2x23.4)/2.75 = 179.62 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
450mm dia pipe
Weight of 1m length = 197+(2x26.5)/2.75 = 216.27 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
500 mm dia pipe
Weight of 1m length = 229.3+(2x32.1)/2.75 = 252.65 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
600 mm dia pipe
Weight of 1m length = 306.5+(2x44)/2.75 = 338.5 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
700mm dia pipe s/s for 5m
Weight of 1m length = 394.3+(2x59.9)/2.75 = 437.86 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
750 mm dia pipe
Weight of 1m length = 443.8+(2x59.7)/2.75 = 494.49 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
Sub Analysis : (Basic Data)

kgs

kgs

kgs

kgs

kgs

kgs

kgs

OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to
Hydralic field test pressure including transportation of Water with minimum
lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class
Fitters II Class
Machinery
Hire chargers for Hydralic field test pressure testing including transportation of
water @ Rs. 1200/- (1000+200) / day
Materials
Pressure guage
3/4" G.I. Pipe (20 mm)
Specials
Dummies
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22)
(T) Total Rate per 500 Mts.
PH data

day
day
days

Nos
RM
Ls
No.
Lts.

Page 1612 of 3205

(r) Rate per 1 Rmt for 450 mm dia


(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r
Note : Proportionate Testing Charges may be arrived, keeping the diametre of
pipe based on this analysis, for an varities of pipes for various Dia Pipes.

PH data

Page 1613 of 3205

3
PHE-JCIS-3

ii

Jointing CI /DI pipes & fittings with s/s ends including cost of pig lead, hemp yarn
and sundries such as cost of fuel for melting lead, filling with water with lead up
to 500m and testing to required pressure complete. (Reference to specifications.
BIS No.3114/94/12288:1997)
Details of cost for 10 joints
80 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood (Local market rate)
Kerosene (Local market rate)
Spun yarn (Sn.3 - table-31, Pg 82)
Pig lead (Sn-1- table-31, Pg 82)
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
100 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10

PH data

80
day
day
day
q
litre
kg
kg
rm

100
day
day
day
q
litre
kg
kg
rm

Page 1614 of 3205

iii

iv

125 mm dia pipe


a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn ( table-36, Pg 121) 2010-11 SSR
Pig lead ( table-36, Pg 121) 2010-11 SSR
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
150 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
200 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

PH data

125
day
day
day
q
litre
kg
kg
rm

150
day
day
day
q
litre
kg
kg
rm

200
day
day
day
q
litre
kg
kg
rm

Page 1615 of 3205

(d) Total = a+b+c


(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10

PH data

Page 1616 of 3205

vi

250 mm dia pipe


a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

250
day
day
day
q
litre
kg
kg
rm

(d) Total = a+b+c


(e) Add for water charges @ 1%on Labour & Testing Charges

vii

viii

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
300 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
350 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

PH data

300
day
day
day
q
litre
kg
kg
rm

350
day
day
day
q
litre
kg
kg
rm

Page 1617 of 3205

(d) Total = a+b+c


(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10

PH data

Page 1618 of 3205

ix

400 mm dia pipe


a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
450 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10

PH data

400
day
day
day
q
litre
kg
kg
rm

450
day
day
day
q
litre
kg
kg
rm

Page 1619 of 3205

xi

xii

xiii

500 mm dia pipe


a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
600 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
700 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

PH data

500
day
day
day
q
litre
kg
kg
rm

600
day
day
day
q
litre
kg
kg
rm

700
day
day
day
q
litre
kg
kg
rm

Page 1620 of 3205

(d) Total = a+b+c


(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10

PH data

Page 1621 of 3205

xiv

xv

750 mm dia pipe


a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1%on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10
800 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Fuel wood
Kerosene
Spun yarn
Pig lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment and Labour, Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint =h/10

PH data

750
day
day
day
q
litre
kg
kg
rm

800
day
day
day
q
litre
kg
kg
rm

Page 1622 of 3205

4
PHE-JCIR-4

Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the
cost of the gasket but including all sundries filling with water, with a water lead up to
500m and testing to required pressure, etc. complete Reference to specifications IS
3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.
Details of cost for 10 Joints
80 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

80
day
day

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

ii

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
100 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

PH data

100
day
day

each
rm

Page 1623 of 3205

iii

125 mm dia pipe


a) Labour
Plumber 2nd class
Man mazdoor

125
day
day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

iv

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
150 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

150
day
day

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
200 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
PH data

200
day
day

each
rm

Page 1624 of 3205

vi

250 mm dia pipe


a) Labour
Plumber 2nd class
Man mazdoor

250
day
day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

vii

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
300 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

300
day
day

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

viii

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
350 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
PH data

350
day
day

each
rm

Page 1625 of 3205

viii

400 mm dia pipe


a) Labour
Plumber 2nd class
Man mazdoor

400
day
day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

ix

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
450 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

450
day
day

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
500 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
PH data

500
day
day

each
rm

Page 1626 of 3205

xi

600 mm dia pipe


a) Labour
Plumber 2nd class
Man mazdoor

600
day
day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit

xii

(h) Cost for 10 joints (f+g)


Rate per joint = h/10
650 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor

650
day
day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

xiii

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
700 mm dia pipe
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
PH data

700
day
day

each
rm

Page 1627 of 3205

Rate per joint = h/10

PH data

Page 1628 of 3205

xix

750 mm dia pipe


a) Labour
Plumber 2nd class
Man mazdoor

750
day
day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
xx

800 mm dia pipe


a) Labour
Plumber 1st class
Plumber 2nd class
Foreman (work inspector) Non technical
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

800
day
day
day

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

xxi

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
900 mm dia pipe
a) Labour
Plumber 1st class
Plumber 2nd class
Foreman (work inspector) Non technical
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
PH data

900
day
day
day

each
rm

Page 1629 of 3205

(g) Overheads & Contractors Profit


(h) Cost for 10 joints (f+g)
Rate per joint = h/10

PH data

Page 1630 of 3205

xxii

1000 mm dia pipe


a) Labour
Plumber 1st class
Plumber 2nd class
Foreman (work inspector) Non technical
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

PH data

1000
day
day
day

each
rm

Page 1631 of 3205

5
PHE-JCIF-5

Jointing CI pipes, fittings and valves with flanged ends including cost of jointing
materials such as bolts, rubber insertion, white lead including filling with water, with
lead up to 500 meters and testing to required pressure complete. (Reference to
specifications. BIS No.3114/1994.)
Details of cost for 10 joints
80 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

80
day
day
day

b) Material
Bolts and nuts 16mm dia 60mm long(Table-31,Pg.82-2014-15)
Rubber insertion 5mm thick(Table-31,Pg.18-2014-15)
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

kg
kg

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

ii

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
100 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Bolts and nuts 16mm dia 60mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

100
day
day
day

kg
kg

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

iii

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
125 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

PH data

125
day
day
day

Page 1632 of 3205

b) Material
Bolts and nuts 16mm dia 60mm long
Rubber insertion 5mm thick
White lead

PH data

kg
kg

Page 1633 of 3205

c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

iv

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
150 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Bolts and nuts 20mm dia 65mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

150
day
day
day

kg
kg

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
200 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

200
day
day
day

b) Material
Bolts and nuts 20mm dia 70mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
PH data

kg
kg

rm

Page 1634 of 3205

vi

250 mm dia

250

a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

day
day
day

b) Material
Bolts and nuts 20mm dia 75mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

kg
kg

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

vii

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
300 mm dia

300

a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

day
day
day

b) Material
Bolts and nuts 20mm dia 75mm long

kg

Rubber insertion 5mm thick

kg

White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

PH data

Page 1635 of 3205

viii

350 mm dia

350

a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

day
day
day

b) Material
Bolts and nuts 20mm dia 80mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

kg
kg

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

ix

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
400 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Bolts and nuts 24mm dia 85mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

PH data

400
day
day
day

kg
kg

rm

Page 1636 of 3205

450 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

450
day
day
day

b) Material
Bolts and nuts 24mm dia 85mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

xi

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
500 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

PH data

kg
kg

rm

500
day
day
day

kg
kg

rm

Page 1637 of 3205

xii

600 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

600
day
day
day

b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

kg
kg

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

xiii

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
700 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

700
day
day
day

b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

PH data

kg
kg

rm

Page 1638 of 3205

xiv

750 mm dia
a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor

750
day
day
day

b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

kg
kg

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

6
PHE-LRCS-6

as per RCC SS

(f) Total = d+e+f


(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
Lowering the RCC S/S pipes carefully into the trenches laying them true to
alignment and gradient, jointing with rubber rings and testing including filling with
water with a water lead upto 500 meters including cost of rubber rings as per BIS
No. 783/1985
Unit= 1 rmt
Taking out put 100 rmt
80 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

RCC-NP2

80
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

each
rm

Page 1639 of 3205

ii

as per RCC SS

100 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

100
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
iii

as per RCC SS

150 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

150
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

each
rm

Page 1640 of 3205

iv

200 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

200
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

as per RCC SS

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

as per RCC SS

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
225 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)
b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

225
day
day
day
day

each
rm

Page 1641 of 3205

vi

as per RCC SS

250 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

250
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

each

c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

vii

as per RCC SS

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
300 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)
b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

300
day
day
day
day

each
rm

Page 1642 of 3205

viii

as per RCC SS

350 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

350
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

ix

as per RCC SS

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
400 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)
b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

400
day
day
day
day

each
rm

Page 1643 of 3205

as per RCC SS

450 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

450
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

xi

as per RCC SS

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
500 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)
b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

500
day
day
day
day
each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

xii

as per RCC SS

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
600 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)
b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
PH data

600
day
day
day
day

each
rm

Page 1644 of 3205

(e) Add for water charges @ 1% on Labour & Testing Charges

6.A
PHE-LRCS-6

vii

as per RCC SS

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
Lowering the RCC S/S pipes carefully into the trenches laying them true to
alignment and gradient, jointing with rubber rings and testing including filling with
water with a water lead upto 500 meters including cost of rubber rings as per BIS
No. 783/1985
300 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

RCC-NP3
300
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

viii

as per RCC SS

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
350 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

each

c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

350

rm

Page 1645 of 3205

ix

400 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

400
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

as per RCC SS

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

as per RCC SS

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
450 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)
b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

450
day
day
day
day

each
rm

Page 1646 of 3205

xi

500 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

500
day
day
day
day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

as per RCC SS

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

xii

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
600 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)
b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment, labour and Materials needed for testing (as per Sub Analysis 2 A)

as per RCC SS

600
day
day
day
day

each
rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)

PHE-LJGI-7

Rate per rmt = h/100


Lowering and Jointing G.I. pipes and specials / fittings including excavation of
trench of 0.5m width and 0.50 m depth in all soils except rock requiring blasting
and refilling trenches after laying and jointing pipes and also including cost of
jointing materials but excluding the cost of pipes. Reference to specifications. BIS
No.783/85
Details of cost for 10m
15mm dia nominal bore
a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum

PH data

day
day
cum

Page 1647 of 3205

BMW-F.79,Pg.98

b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

m
L.S.

Page 1648 of 3205

ii

BMW-F.79,Pg.98

iii

BMW-F.71,Pg.97

iv

BMW-F.73,Pg.97

20mm dia nominal bore


a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
25mm dia nominal bore
a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
32mm dia nominal bore
a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
40mm dia nominal bore
PH data

day
day
cum
m
L.S.

day
day
cum
m
L.S.

day
day
cum
m
L.S.

Page 1649 of 3205

BMW-F.75,Pg.97

a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.

PH data

day
day
cum
m
L.S.

Page 1650 of 3205

vi

BMW-F.77,Pg.97

vii

viii

c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
50mm dia nominal bore
a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
65mm dia nominal bore
a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
80mm dia nominal bore
a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
PH data

day
day
cum
m
L.S.

day
day
cum
m
L.S.

day
day
cum
m
L.S.

Page 1651 of 3205

ix

Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
100mm dia nominal bore
a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

PH data

day
day
cum
m
L.S.

Page 1652 of 3205

8
PHE-GIDM-8

DGS

ii

DGS

150mm dia nominal bore


a) Labour
Plumber 2nd class
Man mazdoor
E.W.Excavation & refilling 10x0.50x0.50=2.50cum
b) Material
G.I. pipes
white lead, hemp yarn, oil etc.
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
Making connection of G.I. distribution branch with G.I. main by providing and fixing
tee, including cutting and threading the pipes and fixing tee etc., complete.
Reference to specifications. BIS No.783/85
Details of cost for 1 No
25mm branch from 40mm nominal dia main
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
G.I. tee 25mm dia.
G.I. Jam nut 25mm
Sundries
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
Rate per 1No (f+g)
50 mm branch from 80 mm nominal dia main
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
G.I. tee 50mm dia.
G.I. Jam nut 50mm
Sundries
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges

PH data

day
day
cum
m
L.S.

day
day
Each
Each

day
day
Each
Each

Page 1653 of 3205

iii

DGS

(f) Total = d+e


(g) Overheads & Contractors Profit
Rate per 1No (f+g)
100mm branch from 150mm nominal dia main
a) Labour
Plumber 2nd class
Man mazdoor
b) Material
G.I. tee 150mm dia.
G.I. Jam nut 150mm
Sundries
c) Machinery
Nil
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
Rate per 1No (f+g)

PH data

day
day
Each
Each

Page 1654 of 3205

9
PHE-LACP-9

Lowering and laying AC pressure pipes (class 5 & 10) in ready made trenches true
to alignment and gradient including all sundries but excluding conveyance from
source of supply. Reference to specifications BIS 6530/72
Details of cost for 1rmt
Note : The Coat of lowring, laying is taken for 1 kg weight as per sub-analysis made
for CI SS ends.

A
i

ii

iii

iv

vi

vii

viii

ix

Class 10 & 15 pipes :


80 mm dia pipe
Weight of 1m length = (6.225+6.225)/2 = 6.225 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
100 mm dia pipe
Weight of 1m length = (7.8+8.18)/2 = 7.99 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
125 mm dia pipe
Weight of 1m length = (9.8+10.725)/2 = 10.262 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
150 mm dia pipe
Weight of 1m length = (12.15+15.18)/2 = 13.665 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
200 mm dia pipe
Weight of 1m length = (19.1+25.3)/2 = 22.2 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
250 mm dia pipe
Weight of 1m length = (24.9+32)/2 = 28.450 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
300 mm dia pipe
Weight of 1m length = (32.2+44.925)/2 =38.562 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
350 mm dia pipe
Weight of 1m length = (13.6+54.875)/2 = 47.237 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
400 mm dia pipe
PH data

kgs

kgs

kgs

kgs

kgs

kgs

kgs

kgs

Page 1655 of 3205

Weight of 1m length = (49.125+71.425)/2 =60.275 kgs


(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre

PH data

kgs

Page 1656 of 3205

xi

xii

B
i

ii

iii

iv

vi

vii

450 mm dia pipe


Weight of 1m length = (59.225+84.025)/2 = 71.625 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
500 mm dia pipe
Weight of 1m length = (73.2+104.25)/2 = 88.725 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
600 mm dia pipe
Weight of 1m length = (102.5+148.025)/2 = 125.262 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
Class 20 & 25 pipes :
80 mm dia pipe
Weight of 1m length = (6.23+8.525)/2 = 7.378 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
100 mm dia pipe
Weight of 1m length = (10.35+12.825)/2 =11.587 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
125 mm dia pipe
Weight of 1m length = (13.35+16.825)/2 = 15.087 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
150 mm dia pipe
Weight of 1m length = (18.9+23.65)/2 = 21.275 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
200 mm dia pipe
Weight of 1m length = (32.1+40.75)/2 = 36.425 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
250 mm dia pipe
Weight of 1m length = (41.175+51.65)/2 = 46.412 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
300 mm dia pipe
Weight of 1m length = (58.1+74.05)/2 = 66.075 kgs
(a) Labour charges for laying
PH data

kgs

kgs

kgs

kgs

kgs

kgs

kgs

kgs

kgs

kgs

Page 1657 of 3205

viii

ix

xi

xii

10

PHE-JACP-10

(b) Overheads & Contractors Profit


Rate per metre
350 mm dia pipe
Weight of 1m length = (71.275+81.55)/2 = 76.412 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
400 mm dia pipe
Weight of 1m length = (93.05+115.4)/2 = 104.225 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
450 mm dia pipe
Weight of 1m length = (111.275+139.45)/2 = 125.36 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
500 mm dia pipe
Weight of 1m length = (136.325+171.275)/2 = 153.8 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
600 mm dia pipe
Weight of 1m length = (192.925+245.9)/2 = 219.412 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
Rate per metre
Jointing A.C. pressure pipes with A.C. coupling or C.I. detachable joints complete
with rubber rings including filling with water, with a water lead up to 500m and
testing to required pressure etc., complete but excluding cost of jointing materials
and conveyance of pipe from source of supply. Reference to specifications BIS
No.6530/72 (Labour Charges Only)
Detail of cost for 10 joints
Sub Analysis : For Machinery used for testing
OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to
Hydralic
test pressure
transportation
of Water with minimum
(Length =field
500 Mts)
taking outincluding
put / 500 Mts.
Unit = 1 Rmt.
lead of 500 M
Machinery
Hire chargers for Hydralic field test pressure testing including transportation of
water
@ Rs. 1200/- (1000+200) / day
Materials
Pressure guage
3/4" G.I. Pipe
Specials
Dummies
Diesel (2 Lts. / Hr) 30 Hrs.
(T) Total Rate per 500 Mts.
(r) Rate per 1 Rmt for 450 mm dia
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r
80 mm dia meter pipe
(a) Labour
PH data

kgs

kgs

kgs

kgs

kgs

days
Nos
Mts
Ls
No.
Lts.

Page 1658 of 3205

ii

iii

iv

Plumber 1st class


Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
testingCharges
equipment, labour and
(c) Add
for water charges
@ hire
1% on
Labour of
& Testing
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
100 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
testingCharges
equipment, labour and
(c) Add
for water charges
@ hire
1% on
Labour of
& Testing
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
125 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
testingCharges
equipment, labour and
(c) Add
for water charges
@ hire
1% on
Labour of
& Testing
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
150 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
testingCharges
equipment, labour and
(c) Add
for water charges
@ hire
1% on
Labour of
& Testing
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
200 mm dia meter pipe
(a) Labour
Plumber 1st class
PH data

day
day
day
rm

day
day
day
rm

day
day
day
rm

day
day
day
rm

day

Page 1659 of 3205

vi

vii

viii

ix

Plumber 2nd class


Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
testingCharges
equipment, labour and
(c) Add
for water charges
@ hire
1% on
Labour of
& Testing
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
250 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
testingCharges
equipment, labour and
(c) Add
for water charges
@ hire
1% on
Labour of
& Testing
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
300 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
testingCharges
equipment, labour and
(c) Add
for water charges
@ hire
1% on
Labour of
& Testing
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
350 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
testingCharges
equipment, labour and
(c) Add
for water charges
@ hire
1% on
Labour of
& Testing
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
400 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
PH data

day
day
rm

day
day
day
rm

day
day
day
rm

day
day
day
rm

day
day

Page 1660 of 3205

Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
of testing
(c) Add
for water charges
@ 1%hire
on Labour
& Testing
Charges equipment and
transportation of water upto 500 M lead Materials needed for testing (as per
Sub Analysis 11 A)

PH data

day
rm

Page 1661 of 3205

xi

(d) Total = a+b+c


(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
450 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
of testing
(c) Add
for water charges
@ 1%hire
on Labour
& Testing
Charges equipment and
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
500 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total

day
day
day
rm

day
day
day

PH data

Page 1662 of 3205

xii

11

PHE-LJUP-11

(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
of testing
(c) Add
for water charges
@ 1%hire
on Labour
& Testing
Charges equipment and
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10
600 mm dia meter pipe
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Total
(b) Machinery for Testing of Pipelines with required pressure as per relevant
IS
Specification
including
charges
of testing
(c) Add
for water charges
@ 1%hire
on Labour
& Testing
Charges equipment and
transportation of water upto 500 M lead Materials needed for testing (as per
(d)
= a+b+c
SubTotal
Analysis
11 A)
(e) Overheads & Contractors Profit
(f) Cost for 10 joints = d+e
Rate per each joint = f/10

day
day
day
rm

Lowering, laying, jointing and testing to hydralic test pressure including cost of
water with minimum water lead of 500m for UPVC pressure pipes in ready made
trenches true to alignment and gradient including all sundries but excluding cost &
conveyance of pipes from source of supply and jointing materials as per BIS No.
7634 - Part III - 1975
Sub Analysis for 160 mm Dia :
Taking output : Length - 500 m ; Joints - 83 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Testing of Pipelines with required pressure as per relevant IS Specification including
filling with water with a water lead upto 500 M, including hire charges of testing
equipment and labour, Materials needed for testing (as per Sub Analysis 2 A)
Total
(b) Material
Add for Water charges at 1% on Labour & Testing

(c) Overheads & Contractors Profit


(d) Total (a+b+c)
Rate per RM =d/500
Rate per 10 mm / 1rm
All Classes pipes :
63 mm dia pipe

ii

Weight of 1m length = (0.468+0.666+1.01)/3 =0.715 kgs


(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
75 mm dia pipe

rm

PH data

160

day
day
day

rm

Lt

rm

Page 1663 of 3205

iii

Weight of 1m length = (0.655+0.923+1.439)/3 =1.005 kgs


(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
90 mm dia pipe

iv

Weight of 1m length = (0.924+1.321+2.032)/3 =1.426 kgs


(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
110 mm dia pipe

Weight of 1m length = (1.323+1.902+3.062)/3 =2.096 kgs


(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
125 mm dia pipe
Weight of 1m length = (1.722+2.511+3.929)/3 =2.72 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt

PH data

rm

rm

rm

rm

Page 1664 of 3205

vi

vii

viii

ix

xi

xii

xiii

12
PHE-LJHE-12

140 mm dia pipe


Weight of 1m length = (2.144+3.116+4.905)/3 =3.388 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
160 mm dia pipe
Weight of 1m length = (2.799+4.012+6.414)/3 =4.408 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
180 mm dia pipe
Weight of 1m length = (3.581+5.134+8.092)/3 =5.602 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
200 mm dia pipe
Weight of 1m length = (4.331+6.351+10.001)/3 =6.894 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
225 mm dia pipe
Weight of 1m length = (5.511+7.975+12.675)/3 =8.72 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
250 mm dia pipe
Weight of 1m length = (6.674+9.886+15.666)/3 =10.742 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
280 mm dia pipe
Weight of 1m length = (8.453+12.404+19.616)/3 =13.491 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
315 mm dia pipe
Weight of 1m length = (10.682+15.723+24.732)/3 =17.046 kgs
(a) Labour charges for laying, jointing & testing
(b) Overheads & Contractors Profit
Rate per metre a+b
Rate per 1 Rmt
Laying and jointing of HDPE pipes by butt fusion welding as per IS:7634 partII/1975 as amended from time to time to the alignment and gradient and testing the
pipeline to the required pressure.
Note : Specialized labour is needed for execution of laying & jointing for HDPE
Pipes with buttfusion welding technique as per IS Specification.

63 mm Dia
Taking output : Length - 480 m ; Joints - 40 Nos
PH data

rm

rm

rm

rm

rm

rm

rm

rm

Ma

Page 1665 of 3205

(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hirecharges of Generator Set & Hydraulic Testing Equipment

ii

iii

(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/480
75 mm Dia
Taking output : Length - 456 m ; Joints - 38 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/456
90 mm Dia
Taking output : Length - 432 m ; Joints - 36 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
PH data

day
day
day
day
day
day

day
Lt
Lt
Lt
day

day
day
day
day
day
day

day
Lt
Lt
Lt
day

day
day
day
day
day
day

Page 1666 of 3205

Hire charges of Generator Set & Hydraulic testing equipment


(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/432

PH data

day
Lt
Lt
Lt
day

Page 1667 of 3205

iv

vi

110 mm Dia
Taking output : Length - 384 m ; Joints - 32 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hirecharges of Generator Set & Hydraulic Testing Equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/384
125 mm Dia
Taking output : Length - 348 m ; Joints - 29 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/348
140 mm Dia
Taking output : Length - 300 m ; Joints - 25 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
PH data

day
day
day
day
day
day
day
Lt
Lt
Lt
day

day
day
day
day
day
day
day
Lt
Lt
Lt
day

day
day
day
day
day
day
day

Page 1668 of 3205

Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/300

Lt
Lt
Lt
day

PH data

Page 1669 of 3205

vii

viii

160 mm Dia
Taking output : Length - 303 m ; Joints - 25 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/303
180 mm Dia
Taking output : Length - 240 m ; Joints - 20 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total Labour
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/240

PH data

day
day
day
day
day
day
day
Lt
Lt
Lt
day

day
day
day
day
day
day
day
Lt
Lt
Lt
day

Page 1670 of 3205

ix

xi

200 mm Dia
Taking output : Length - 240 m ; Joints - 20 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/240
225 mm Dia
Taking output : Length - 216 m ; Joints -18 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/216
250 mm Dia
Taking output : Length - 216 m ; Joints - 18 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
PH data

day
day
day
day
day
day
day
Lt
Lt
Lt
day

day
day
day
day
day
day
day
Lt
Lt
Lt
day

day
day
day
day
day
day
day

Page 1671 of 3205

xii

xiii

xiv

(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/216
280 mm Dia
Taking output : Length - 192 m ; Joints - 16 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/192
315 mm Dia
Taking output : Length - 180 m ; Joints - 15 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/180
355 mm Dia
Taking output : Length - 144 m ; Joints - 12 Nos
(a) Labour
For lowering / sub surface transport
Mazdoor
Jointing
Fitter
PH data

Lt
Lt
Lt
day

day
day
day
day
day
day
day
Lt
Lt
Lt
day

day
day
day
day
day
day
day
Lt
Lt
Lt
day

day
day

Page 1672 of 3205

Mazdoor
Testing
Fitter
Mazdoor
Supervisor
Total
(b) Machinery
Hire charges of Generator Set & Hydraulic testing equipment
(c) Material
Kerosene
Diesel
Water for Testing
Transport
Overheads & Contractors Profit
(d) Total (a+b+c)
Rate per RM =d/144

PH data

day
day
day
day
day
Lt
Lt
Lt
day

Page 1673 of 3205

13
PHE-LJSW-13

Lowering and laying in ready made trench true to alignment and gradient, jointing,
and testing of stone ware pipes including cost of jointing material such as cement
mortar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe.
(Reference to specifications BIS No. 6530/72)
Detail cost for 30 meters
SWG -SP-1 Pipes

A
i

BMW-A.15

100 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
100 mm dia SW pipe 60cm long

day
day
day
day
each/rm

Cement for 50 joints =0.045 cum


Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

Table-36,

t/kg
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
ii

BMW-A.16

150 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
150 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM

PH data

Page 1674 of 3205

iii

BMW-A.17

200 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
200 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
iv

230 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
230 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30

day
day
day
day
each
t
cum
kgs

Rate per 1 RM
v

BMW-A.18

250 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
250 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM

PH data

Page 1675 of 3205

vi

BMW-A.19

300 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
300 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
vii

BMW-A.20

350 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
350 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM

PH data

Page 1676 of 3205

viii

BMW-A.21

400 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
400 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
ix

BMW-A.22

450 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
450 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM

SP-2 Pipes

B
i

BMW-A.23

Table-36,Pg.137

100 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
100 mm dia SW pipe 60cm long

day
day
day
day
each/rm

Cement for 50 joints =0.045 cum


Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
PH data

t/kg
cum
kgs

Page 1677 of 3205

(g) Cost for 30 m (e+f)


Rate per metre = g/30
Rate per 1 RM

PH data

Page 1678 of 3205

ii

BMW-A.24

150 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
150 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
iii

BMW-A.25

200 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
200 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
iv

230 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
230 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
PH data

Page 1679 of 3205

BMW-A.26

250 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
250 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
vi

BMW-A.27

300 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
300 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
vii

BMW-A.28

350 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
350 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
PH data

Page 1680 of 3205

viii

BMW-A.29

400 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
400 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
ix

BMW-A.30

450 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
450 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM

PH data

Page 1681 of 3205

SP-3 Pipes

C
i

BMW-A.31

100 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
100 mm dia SW pipe 60cm long

day
day
day
day
each/rm

Cement for 50 joints =0.045 cum


Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

Table-36,Pg.137

t/kg
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
ii

BMW-A.32

150 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
150 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
iii

BMW-A.33

200 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
200 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
PH data

day
day
day
day
each
t
cum
kgs

Page 1682 of 3205

Rate per metre = g/30


Rate per 1 RM
iv

230 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
230 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
v

BMW-A.34

250 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
250 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
vi

BMW-A.35

300 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
300 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
PH data

day
day
day
day
each
t
cum
kgs

Page 1683 of 3205

Rate per metre = g/30


Rate per 1 RM
vii

BMW-A.36

350 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
350 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
viii

BMW-A.37

400 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
400 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges

day
day
day
day
each
t
cum
kgs

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
ix

BMW-A.38

450 mm dia
(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor (Water carrier)
b) Material
450 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
PH data

day
day
day
day
each
t
cum
kgs

Page 1684 of 3205

Rate per metre = g/30


Rate per 1 RM
14
PHE-CISP14(sub_
analysis)

Sub Analysis :
Labour charges for laying in position S&S or flanged C.I. specials such as tees,
bends, collars tapers and caps etc
10 No. Tees of 200x150mm dia
Weight = 10x70kgs = 700 kgs
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Cost for 700 kgs
Cost for 1kg

day
day
day

PH data

Page 1685 of 3205

15
PHE-CISV-15

ii

iii

iv

vi

vii

viii

ix

Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand
wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve
and tail pieces
Details of cost for 1No
80 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel & reflex valves - Weight
(32.3+34.1+40)/3=35.47
Overheads & Contractors Profit
Rate per 1 Sluice valve
100 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel & reflex
(44.3+47+50)/3=47.1
(g) Overheads & Contractors Profit
Rate per 1 Sluice valve
125 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel & reflex
(56.3+59+70)/3=61.77
(g) Overheads & Contractors Profit
Rate per 1 Sluice valve
150 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel &
(72.5+77+90)/3=79.83
(g) Overheads & Contractors Profit
Rate per 1 Sluice valve
200 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel &
(121.5+128.6+145)/3=131.7
(g) Overheads & Contractors Profit
Rate per 1 Sluice valve
250 mm dia meter
Labour for laying Sluice Valve with cap, with hand wheel &
(179.9+186.6+195)/3=187.16
(g) Overheads & Contractors Profit
Rate per 1 Sluice valve
300 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel &
(242.4+257+300)/3=266.46
(g) Overheads & Contractors Profit
Rate per 1 Sluice valve
350 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel &
(430+470)/2=450
Overheads & Contractors Profit
Rate per each
400 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel &
(525+580)/2=552.5
Overheads & Contractors Profit
PH data

kgs

valves - Weight

kgs

valves - Weight

kgs

reflex valves -

kgs

reflex valves -

kgs

reflex valves -

kgs

reflex valves -

kgs

reflex valves -

kgs

reflex valves -

kgs

Page 1686 of 3205

Rate per each


450 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel & reflex valves (635+810)/2=722.5
Overheads & Contractors Profit
Rate per each

PH data

kgs

Page 1687 of 3205

500 mm dia meter


(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel & reflex valves (775+900)/2=837.5
Overheads & Contractors Profit
Rate per each
600 mm dia meter
(a) Labour
Labour for laying Sluice Valve with cap, with hand wheel & reflex valves (1220+1625)/2=1422.5
Overheads & Contractors Profit
Rate per each

xi

xii

16

PHE-DAAV-16

16
B
i

ii

17
PHE-SFHD-17

kgs

kgs

Providing and fixing double acting air valves including boring the main threading the
bore and fixing nipple etc.,excluding the cost of rubber insertions, bolts & nuts, air
valve & flanged tail pieces complete
Details of cost for each
50 mm dia meter
(a) Labour
Labour for laying air valve
Plumber 2nd class
Man mazdoor
Overheads & Contractors Profit
Rate per each valve
Labour charges for fixing Air valves including boring the mains and threading the
bore fixing nipple etc., complete.
Unit each
40 mm dia
(a) Labour
Lowering charges for air valve
Boring main & threding etc
Plumber 2nd class
Man mazdoor
Overheads & Contractors Profit
Rate per each valve
25 mm dia
(a) Labour
Lowering charges for air valve
Boring main & threding etc
Plumber 2nd class
Man mazdoor
Overheads & Contractors Profit
Rate per each valve

kgs
day
day

kgs
day
day

kgs
day
day

Providing and fixing spindle fire hydrant with 65 mm outlet. Complete with bolts,
nuts, and rubber insertion etc. complete but excluding cost of Materials.
Details of cost for 1fire hydrants
65 mm dia
(a) Labour
Plumber 1st class
Plumber 2nd class
Man mazdoor
Overheads & Contractors Profit
Rate per each fire hydrant
Note : For other sizes proportionately allow the Data.

PH data

day
day
day

Page 1688 of 3205

18
PHE-DSFH-18

19
PHE-URCI-19

ii

Dismantling of spindle fire hydrant including stacking of useful materials within 50m
lead
Details of cost for 10 Nos
65 mm dia
(a) Labour
Fitter 1st class
Fitter 2nd class
Man mazdoor
Overheads & Contractors Profit
Rate per each
Uprooting of C.I. pipes by melting lead, loosening the joints, separating the pipes,
hoisting and keeping within a lead of 10 metres but excluding earth work excavation
and refilling
Details of cost for 40.26 m
80mm dia metre
(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
100mm dia metre
(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26

day
day
day

day
day

q
litre

day
day

q
litre

Say Rs.
iii

125mm dia metre


(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26

PH data

day
day

q
litre

Page 1689 of 3205

iv

150mm dia metre


(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26

day
day

q
litre

Say Rs.
v

200mm dia metre


(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26

day
day
q
litre

Say Rs.
vi

250mm dia metre


(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26

day
day

q
litre

Say Rs.
vii

viii

300mm dia metre


(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
350mm dia metre
(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
PH data

day
day

q
litre

day
day

Page 1690 of 3205

Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26

PH data

litre

Page 1691 of 3205

ix

xi

xii

400mm dia metre


(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
450mm dia metre
(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
500mm dia metre
(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
600mm dia metre
(a) Labour
Assistant fitter(plumber 2nd class)
Man mazdoor
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26

PH data

day
day

q
litre

day
day

q
litre

day
day

q
litre

day
day

q
litre

Page 1692 of 3205

20
PHE-URRC-20

ii

iii

iv

21

PHE-URSW-21

ii

Uprooting of R.C.C. Pipes including breaking the collars, loosing the joint, scraping
the pipe, hoisting and keeping within a lead of 10 M but excluding earthwork
excavation and refilling
Taking output 10.00 Rmt
100mm dia
(a) Labour
Fitter 2nd class
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
150mm dia
(a) Labour
Fitter 2nd class
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
225mm dia
(a) Labour
Fitter 2nd class
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
300mm dia
(a) Labour
Fitter 2nd class
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking
of useful materials near the site with in 50m lead and disposal of un serviceable
materials in to municipal dumps excluding the cost of earth work excavation.
(Reference to specifications BIS No.)

Details of cost for 10 m


100mm dia metre
(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
150mm dia metre
(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
PH data

day
day
day

day
day
day

day
day
day

day
day
day

day
day

day
day

Page 1693 of 3205

Rate per each m =c/10

PH data

Page 1694 of 3205

iii

iv

vi

vii

viii

ix

200mm dia metre


(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
230mm dia metre
(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
250mm dia metre
(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
300mm dia metre
(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
350mm dia metre
(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
400mm dia metre
(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
450mm dia metre
(a) Labour
Man mazdoor
Women mazdoor
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10

PH data

day
day

day
day

day
day

day
day

day
day

day
day

day
day

Page 1695 of 3205

22
PHE-URGI-22

ii

PHE-CCIP-23

23

ii

iii

iv

Removing old G.I.pipes and specials / fittings and cleaning, scraping the pipes,
hoisting and keeping with in 50m lead but excluding earth work excavation of
trenches and refilling
Details of cost for 10 m
15 to 40mm dia
(a) Labour
Plumber
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
Above 40mm dia
(a) Labour
Plumber
(b) Overheads & Contractors Profit
(c) Cost for 10 m (a+b)
Rate per each m =c/10
Cutting C.I. / D.I. pipes without water in mains
Details of cost for one cutting
80 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
100 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
125 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
150 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
200 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m

PH data

day

day

day
day

day
day

day
day

day
day

day
day

Page 1696 of 3205

vi

vii

viii

ix

xi

xii

24
PHE-DTCI-24

ii

iii

250 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
300 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
350 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
400 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
450 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
500 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
600 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m

day
day

day
day

day
day

day
day

day
day

day
day

day
day

Drilling and tapping C.I./D.I. main and fixing brass screw down ferrule and
C.I.mouth cover.(Labour charges only)
Details of cost for one no
15 mm dia
(a) Labour
Plumber
(b) Overheads & Contractors Profit
Rate per each m
20 mm dia
(a) Labour
Plumber
(b) Overheads & Contractors Profit
Rate per each m
25 mm dia
PH data

day

day

Page 1697 of 3205

(a) Labour
Plumber
(b) Overheads & Contractors Profit
Rate per each m

PH data

day

Page 1698 of 3205

25

Shoring and strutting of trenches for water and sewer lines

(A)

Single staging from 0 to 8-0 ( 0 to 2.5 Metre)


Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M deep.
Area = 30 x 1.5 = 45 sqm
(a) Labour
Carpenter 2nd class
Man mazdoor
b) Material
Polling boards and ballies
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 x 0.038)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 4 x 1.5
DeductCredit for materials after use @ 80% of the cost of materials =0.8 x X

PHE-SHST-25

(B)

Jungle wood
planks,item
47/Pg.196

c) Machinery
Nil
Overheads & Contractors Profit
(d) Cost for 45 sqm (a+b+c)
Rate per each sqm = d/45
Double staging from 8 to 14 ( 2.5 to 4.5 Metre)
Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M deep.
Area = 30 x 1.5 = 45 Sqm
(a) Labour
Carpenter 2nd class
Man mazdoor
b) Material
Polling boards and ballies
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 x 0.038 = 0.57 cum)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 4 x 1.5 = 1.1 cum
Deduct Credit for materials after use @ 80% of the cost of materials = 0.8 x X
c) Machinery
Nil
Overheads & Contractors Profit
(d) Cost for 45 sqm (a+b+c)
Rate per each sqm = d/45

(C)

Triple staging beyond 14 for every 2 meter (beyond 4.5 M)


Depth not exceeding 1.5 M.
Note : Add for every 2 Mts (difference of single and double staging) for
staging beyond 4.5 mts.

PH data

day
day
sqm
cum
cum

day
day
sqm
cum
cum

Page 1699 of 3205

26
PHE-BHLW-26

Taking output 3 Rmt


Material
Bamboos of 1 dia 2.5 M long (5 ft c/c = 3 x 2.5)
Bamboos of 1 dia 3.66 M long (5 ft c/c = 3x 3.66)
Cost of Bamboos
(a) Usage of Material 5 times. Thus Cost of Material taken as 20%

BMC-X.12
BMC-X.13

27

PHE-RCVS-27

Barricading, hoarding, lighting and watching etc., for water supply and sewerage
works for trenches of depths upto 6-0 (2 Meter) below G.L

(b) Labour
Man mazdoor
(c) Sundries for Coir rope, nails, @ 1%
(d) Sundries for lighting and watching etc at 1%
Overheads & Contractors Profit
Cost for 3rmt (a+b+c+d)
Rate per each rmt = (a+b+c+d)/3
Providing RCC spun vent shaft with cowl 140 mm and 200 mm internal and external
dia respectively at top, 300 and 450 mm internal and external dia respectively at
bottom and 9.10m overall length. Bottom 1.25 m below ground level fixed in a pit
90cmx90cm x150 cm with cement concrete 1:4:8, 25cm in bed and minimum 20cm
all-round with top 15cm in cement concrete 1:2:4. Junction of vent shaft and
concrete grouted with cement mortar 1:1 including making connection with sewer
manhole with 150 mm dia metre cement concrete pipe of required length complete
as per standard design

Details of cost for one vent shaft


(a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor (bhandani)
Man mazdoor (beldar)
b) Material
RCC went shaft with cowl
RCC pipe 150 mm dia 0.50 m (NP-2 class)
Cement Concrete 1:4:8(plain)
0.90 x 0.90 x 135 = 1.094 cum
Less for shaft 22/7 x 4 x 0.452 x 1.1= 0.175cum = 0.919 cum
Cement Concrete 1:2:4 (plain)
0.90 x 0.90 x 0.15 = 0.122 cum
Less for shaft 22/7x4 x 0.452 x 0.15= 0.024cum = 0.098 cum
(c) Total (a+b)
(d) Add for water charges @ 1% on Labour & Testing Charges on Labour
Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 1 No = e+f

PH data

rmt
rmt

day

day
day
day
day
each
m

cum

cum

Page 1700 of 3205

28

PHE-WSNP-28

ii

iii

iv

Well Sinking
Well sinking in sandy and other loose soils under water either by manual labour,
divers or dredgers weighting the top of staining to assist sinking etc., including
dewatering and other incidental charges such as hire charges for mechanical
equipment etc., complete upto 4.0 m dia (For non perennial rivers)

Upto 2.0 m below G.L. :


(a) Labour
Man mazdoor
(b) Total
Rate per Rm = b/2
2.0 to 4.0 m below G.L. :
(a) Labour
Man mazdoor
Sinkers
b) Machinery
Hire charges for crane
Hire charges for Air compressor
Hire charges for Generator
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
4.0 to 6.0 m below G.L. :
(a) Labour
Man mazdoor
Sinkers
b) Machinery
Hire charges for crane
Hire charges for Air compressor
Hire charges for Generator
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
6.0 to 8.0 m below G.L. :
(a) Labour
Man mazdoor
Sinkers
b) Machinery
Hire charges for crane
Hire charges for Air compressor
Hire charges for Generator
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
8.0 to 10.0 m below G.L. :
(a) Labour
Man mazdoor
Sinkers
b) Machinery
Hire charges for crane
Hire charges for Air compressor
Hire charges for Generator
Diesel

day

day
day
hour
hour
hour
L

day
day
hour
hour
hour
L

day
day
hour
hour
hour
L

day
day
hour
hour
hour
L
PH data

Page 1701 of 3205

29

PHE-WSOW-29

ii

iii

iv

Overheads & Contractors Profit


c) Total
Rate per Rm = c/2
Sinking of RCC 12 m dia well in sandy soils, soft disintegrated rock, loamy and
clayey soils etc; under water by manual or mechanical means including dewatering
until the completion of sinking of the well to the required depth, the dummies of the
weep holes pipes are opened for seepage of water into well, including all hire
charges complete as per SS and as directed by the departmental officers (Open
well excavation)

Upto 2.0 m below G.L. :


(a) Labour
Man mazdoor
(b) Total
Rate per Rm = b/2
2.0 to 4.0 m below G.L. :
(a) Labour
Man mazdoor
Crane Operator
b) Machinery
Hire charges for crane
Hire charges for Generator
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
4.0 to 6.0 m below G.L. :
(a) Labour
Man mazdoor
Sinkers
Crane Operator
b) Machinery
Hire charges for crane
Hire charges for Air compressor
Hire charges for Generator
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
6.0 to 8.0 m below G.L. :
(a) Labour
Man mazdoor
Sinkers
Crane Operator
b) Machinery
Hire charges for crane
Hire charges for Air compressor
Hire charges for Generator
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
8.0 to 10.0 m below G.L. :
(a) Labour
Man mazdoor
Sinkers
Crane Operator

day

day
day
hour
hour
L

day
day
day
hour
hour
hour
L

day
day
day
hour
hour
hour
L

day
day
day
PH data

Page 1702 of 3205

b) Machinery
Hire charges for crane
Hire charges for Air compressor
Hire charges for Generator
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2

hour
hour
hour
L

PH data

Page 1703 of 3205

vi

30

PHE-WSPR-30

ii

iii

10.0 to 12.85 m below G.L. :


(a) Labour
Man mazdoor
Sinkers
Crane Operator
b) Machinery
Hire charges for crane
Hire charges for Air compressor
Hire charges for Generator
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2.85
Well sinking in sandy and other loose soils under water either by manual labour,
divers or dredgers weighting the top of steining to assist sinking etc., including
dewatering and other incidental charges such as hire charges for mechanical
equipment etc., complete upto 7 m dia (In Perennial Rivers only)

Upto 2.0 m below G.L. :


(a) Labour
Man mazdoor
Well sinkers
b) Machinery
Hire charges of set of Helmets & Air circulating pipes / valves
Hire charges for crane
Hire charges for compressors
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
2.0 to 4.0 m below G.L. :
(a) Labour
Man mazdoor
Well sinkers
b) Machinery
Hire charges of set of Helmets & Air circulating pipes / valves
Hire charges for crane
Hire charges for compressors
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
4.0 to 6.0 m below G.L. :
(a) Labour
Man mazdoor
Well sinkers
b) Machinery
Hire charges of set of Helmets & Air circulating pipes / valves
Hire charges for crane
Hire charges for compressors
Diesel
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2

PH data

day
day
day
hour
hour
hour
L

day
day
day
hour
hour
L

day
day
day
hour
hour
L

day
day
day
hour
hour
L

Page 1704 of 3205

iv

31
PHE-CCCP-31

6.0 to 8.0 m below G.L. :


(a) Labour
Man mazdoor
day
Well sinkers
day
b) Machinery
Hire charges of set of Helmets & Air circulating pipes / valves
day
Hire charges for crane
hour
Hire charges for compressors
hour
Diesel
L
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
8.0 to 10.0 m below G.L. :
(a) Labour
Man mazdoor
day
Well sinkers
day
b) Machinery
Hire charges of set of Helmets & Air circulating pipes / valves
day
Hire charges for crane
hour
Hire charges for compressors
hour
Diesel
L
Overheads & Contractors Profit
c) Total
Rate per Rm = c/2
Note : This data shall be adopted for well sinking in perennial rivers. For other rivers, data
available for 4.0 m dia infiltration well may be adopted for guidance
Curing of CC pavement for 21 days including cost and conveyance of water, labour
charges, etc., complete
Areas Considered 3 . 5 x 100 mts = 350 sqm
Units = 1 sqm
Mud quantity is required = 14% of CC area x 5 cm
(a) Labour
Man mazdoor (21 x 2).
day
b) Machinery
Carting earth for 3 kms (Pg No.322 of SSR )
cum
Hire charges for Water Drum (5 x 21 days)
each
c) Material
Earth Work (100 x 3.5 x 14/100 x .05)
cum
Supply of Water (240 Lts / cum / day)
L
Overheads & Contractors Profit
(d) Total = a+b+c
Rate per sqm =d/350
Note : 1. When Curing compound is used @ 1.97 kgs/cum, water requirement is 206 Lts /
cum per 14 days.

PHE-CSHR-32

32

2. This data is for urban areas only


Cutting sheet rock including stocking of excavated material.
Quality of sheet rock as per stock measurement = 36.53 cumm (taking out put =
36.53 cum)
(a) Labour
Man mazdoor
b) Machinery
Drilling of holes
Hire charges for JCB
MS Nokkulu
Overheads & Contractors Profit
PH data

day
each
hr
each

Page 1705 of 3205

(c) Total = a+b


Rate per cum =c/36.53

PH data

Page 1706 of 3205

PHE-EXRW-33

33

Excavation in Hard Rock (blasting prohibited)


Excavation for roadway in hard rock (blasting prohibited) with rock breakers
including breaking rock, loading in tippers and disposal with all lifts and lead upto
1000 metres, trimming bottom and side slopes in accordance with requirements of
lines, grades and cross- sections as per Technical Specification Clause 302.3.5

(A)

Manual Means
Unit = cum
Taking output = 1 cum
a)Labour
Mate
Mazdoor (Unskilled)
Chiseller (Hammer Man)
Blacksmith
b) Machinery
Tipper 5.5 cum capacity, 1 trip per hour

day
day
day
day
hour

Credit for excavated rock found suitable for use @ 50 per cent of excavated
quantity - M-089- Pg.29 - Irrigation SSR
Sundries on Labour
c&d) Overheads & Contractors Profit
Rate per cum = (a+b+c+d)
Note : 1. Credit is considered for 50 per cent of quantity of work.

cum

2. Loading for disposal will be done manually, being small quantity.


3. In case some rock is issued to contractor at site, the item of carriage shall be omitted to
the extent of quantity issued to the Contractor.
(B)

Mechanical Means
Unit = cum
Taking output = 1 cum
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker attachment @ 6 cum per hour
Tipper 5.5 cum capacity tipper, 1 trip per hour
Credit for excavated rock found suitable for use @ 50 per cent of
quantity

excavated

day
day
hour
hour
cum

Sundries on Labour
c&d) Overheads & Contractors Profit
Rate per cum = (a+b+c+d)
Note : 1. The quality and availability of rock shall be checked before affording credit.
2. In case some rock is issued to the contractor at site, the item of carriage shall be
restricted/reduced to that extent.
3. Being small quantity, manual loading will be economical in this case and has been
provided accordingly.
34
PHE-LUSS-34

Loading or Unloading materials such as C.I / D.I Pipes, R.C.C. Pipes, P.V.C. pipes,
A.C. Pressure pipes and Specials less than 300 mm upto 4 mts in length including
stacking.
C.I Pipes and Specials (load per truck =6.50 T)
Taking Output = 13.00 MT (Load for each Truck 6.5 MT)
a)Labour
PH data

Page 1707 of 3205

ii

iii

iv

35
PHE-LUMS-35

ii

iii

iv

Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for 13 MT
Rate per MT
RCC Pipes and Collars (load per truck =7.205 T)
Taking Output = 14.41 MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for 14.41 MT
Rate per MT
AC Pipes and Collars (load per truck = 5.40 T)
Taking Output = 10.8 MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for 10.8 MT
Rate per MT
Stone ware pipes (load per truck = 5.40 T)
Taking Output = 10.8 MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for 10.8 MT
Rate per MT
Loading or unloading materials such as C.I / D.I. Pipes, stone ware pipes, R.C.C.
pipes, A.C. Pressure pipes and specials from 300 mm to 600 mm dia upto 4 mts in
length including stacking.
C.I. / D.I. Pipes (load per truck = 5.5 T)
Taking Output = 11 MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for 11 MT
Rate per MT
RCC Pipes and Collars (load per truck =5.75 T)
Taking Output = 11.5 MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for 11.5 MT
Rate per MT
AC Pipes
Taking Output = 1MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for MT
Stone ware pipes
PH data

day

day

day

day

day

day

day

Page 1708 of 3205

36
PHE-LUGS-36
i

ii

37
PHE-LUBS-37
i

ii

38
PHE-CSRC-38

Taking Output = 1MT


a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for MT
Loading or unloading materials such as CI / DI Pipes, A.C. pressure pipes less than
300 mm dia above 4.00 M in length including stacking
C.I. / D.I. Pipes (load per truck = 8.46 T)
Taking Output = 1 MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for 1 MT
AC Pipes (load per truck = 3.78 T)
Taking Output = 1MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for MT
Loading or Unloading materials such as C.I / D.I. Pipes, A.C. Pressure pipes from
300 to 600mm dia above 4.00 m including stacking
AC Pipes (load per truck = 4.3 T)
Taking Output = 1 MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for 1 MT
C.I. Pipes (load per truck = 3.85 T)
Taking Output = 1MT
a)Labour
Man Mazdoor
Add sundries at 1% towards Nylon rope, Tyres etc
Overheads & Contractors Profit
Cost for MT
Centering and scaffolding charges for R.C.C. members including all materials and
labour charges for forming and dismantling

For R.C.C. Elevated Service Reservoir of Staging upto 40 Ft. below G.W.L.

Side wall straight surfaces:


Details cost for 15 M long and 1 M height wall
Surface area = 2 x 15 x 1 = 30 Sqm
a) Materials
i) Planks 33 mm thick
2 x 15 x 1 =
30.00 sqm
Add 5% wastage = 1.5
=31.50 sqm
31.50 x 0.038 = 1.197 Cum
ii) Batters 75 x 50 mm
2 x 13 x 0.075 x 0.05 = 0.095 cum
iii) Ballies 125 dia for strutting
PH data

day

day

day

day

day

cum
cum

Page 1709 of 3205

ver

13 x 1.5 = 19.5
13 x 4.5 = 58.5
= 78.00
5% for wastage = 3.9
= 81.90
2
81.90 x x 0.125 / 4 =1.005 Cum
Assuming that timber shall become unserviceable after being used for 5 times

cum

Cost for 5 times


Rate per 1 time
b) Labour
Labour charges for assembling, erection, dismantling and cleaning
Carpenter 2nd class
Man Mazdoor
Sundries for nails etc
Overheads & Contractors Profit
c) Cost for 30 Sqm
Rate per sqm =c/30

day
day

PH data

Page 1710 of 3205

ii

Side walls curved surfaces


Considering 4 M internal dia and 1 Meter depth. Consider 30 mm thick.
Surface area:
Outside x 4.40 x 1.00 = 13.83 Sqm
Inside area = x 4 x 1 = 12.57 Sqm
= 26.40 Sqm
a) Materials
i) Planks 33 mm
26.40 x 0.038
=
1.003 cum
Extra & Wastage @ 20%
=
0.201 cum
=
1.204 Cum
ii) Hattens 75 x 38 mm
Inside 2 x 25 x 0.50 x 0.075 x 0.075 = 0.1406
Outside 2 x 28 x 0.50 x 0.075 x 0.175 = 0.1575
= 0.2981
Add 5% wastage
= 0.0149
= 0.3130 cum
iii) Ballion 125 mm dia
Inside 25 x 1 = 25 m
Outside 28 x 1 = 28 m
= 53.00 m
Add 5% wastage = 2.65 m
55.65 x 0.1252 = 0.68 cum
Assuming that timber shall become unserviceable after being used for 5 times

B
i

ii
PHE-HSSG-39

39

cum

cum

cum

Cost for 5 times


Rate per 1 time
b) Labour
Add labour charges for assembling, erection and dismantling etc., @ 1/6 cost of
materia
c) Total
Overheads & Contractors Profit
c) Cost for 26.04 Sqm
Rate per sqm =c/26.04
For Ground level works
R.C.C. vertical wells of plane surface upto 3 meters height such as G.L. tanks
clarifiers and sludge digestor etc,
Rate per Sqm (as arrived in item A (i) above)
R.C.C. Vertical walls of circular faces upto 3 meters height
Rate per Sqm (as arrived in item A (ii) above)
Hoisting of S.S. Girders in pump house etc.
Detail cost of S.S. Joist = 300 x 140 mm - 6 M long
Wt. 44.2 Kgs/M
= 6 x 44.20
= 265.20 kgs
Tolerances @ 5%

= 13.26 kgs
= 278.46 kgs

a) Labour
Labour for hoisting inn position:
Mason 2nd class
Man Mazdoor
Total
(b) Overheads & Contractors Profit
c) Cost for 278.46 Sqm
Rate per sqm =c/278.46
Cost for 50 Kg

PH data

day
day

Page 1711 of 3205

PHE-LCVS-40

40

Labour charges for fixing ventilating shafts in sewerage scheme complete


with all accessories
Unit Each
a) Labour
Mason 1st class
Mason 2nd class
Plumber 2nd Class
Man Mazdoor
Overheads & Contractors Profit
Rate

PH data

day
day
day
day

Page 1712 of 3205

for the year

2012 -13

LC
Quantity

Rate Rs.

Amt Rs.

0.102
0.238
1.330

576.00
450.00
384.00

58.75
107.10
510.72
676.57
67.66
1.32

85.500

1.316

112.52
15.75
128.27
25.65

108.670

1.316

143.01
20.02
163.03
32.61

141.330

1.316

185.99
26.04
212.03
42.41

177.000

1.316

232.93
32.61
265.54
PH data

Page 1713 of 3205

53.11

PH data

Page 1714 of 3205

257.330

1.316

338.65
47.41
386.06
77.21

347.670

1.316

457.53
64.05
521.58
104.32

449.670

1.316

591.77
82.85
674.62
134.92

564.000

1.316

742.22
103.91
846.13
169.23

688.330

1.316

905.84
126.82
1032.66
206.53

832.670

1.316

1095.79
153.41
1249.20
249.84

970.670

1.316

1277.40
178.84
1456.24
291.25

1296.000

1.316

1705.54
238.78
1944.32
388.86

1672.000

1.316

2200.35
308.05
2508.40
501.68

1874.330

1.316

2466.62
PH data

Page 1715 of 3205

345.33
2811.95
562.39

PH data

Page 1716 of 3205

2092.670

1.316

2753.95
385.55
3139.50
627.90

2544.000

1.316

3347.90
468.71
3816.61
763.32

3068.000

1.316

4037.49
565.25
4602.74
920.55

22.490

1.316

29.60
4.14
33.74

28.450

1.316

37.44
5.24
42.68

36.950

1.316

48.63
6.81
55.44

46.470

1.316

61.15
8.56
69.71

66.860

1.316

87.99
12.32
100.31

90.530

1.316

119.14
16.68
135.82
PH data

Page 1717 of 3205

116.860

1.316

153.79
21.53
175.32

PH data

Page 1718 of 3205

147.320

1.316

193.87
27.14
221.01

179.620

1.316

236.38
33.09
269.47

216.270

1.316

284.61
39.85
324.46

252.650

1.316

332.49
46.55
379.04

338.500

1.316

445.47
62.37
507.84

437.860

1.316

576.22
80.67
656.89

494.490

1.316

650.75
91.11
741.86

3.000
3.000

504.00
450.00

1512.00
1350.00

3.000

1200.00

3600.00

0.050
3.000

500.00
151.00
500.00
1500.00
57.00

25.00
453.00
500.00
150.00
3420.00
11010.00

0.100
60.000

PH data

Page 1719 of 3205

22.02
0.489

PH data

Page 1720 of 3205

mm
0.135
0.320
1.200

576.00
450.00
384.00

77.76
144.00
460.80

0.190
0.330
1.000
20.000

750.00
25.00
128.00
319.00

142.50
8.25
128.00
6380.00

50.000

3.91

195.50

7536.81
8.78
7545.59
1056.38
8601.97
860.20
mm
0.220
0.530
1.500

576.00
450.00
384.00

126.72
238.50
576.00

0.250
0.330
1.800
24.000

750.00
25.00
128.00
319.00

187.50
8.25
230.40
7656.00

50.000

4.89

244.50

9267.87
11.86
9279.73
1299.16
10578.89
1057.89

PH data

Page 1721 of 3205

mm
0.220
0.530
1.500

576.00
450.00
384.00

126.72
238.50
576.00

0.370
0.700
2.000
28.000

750.00
25.00
128.00
319.00

277.50
17.50
256.00
8932.00

50.000

6.11

305.50

10729.72
12.47
10742.19
1503.91
12246.10
1224.61
mm
0.270
0.630
1.650

576.00
450.00
384.00

155.52
283.50
633.60

0.420
0.760
2.000
36.000

750.00
25.00
128.00
319.00

315.00
19.00
256.00
11484.00

50.000

7.34

367.00

13513.62
14.40
13528.02
1893.92
15421.94
1542.19
mm
0.270
0.630
1.650

576.00
450.00
384.00

155.52
283.50
633.60

0.560
0.756
3.000
54.000

750.00
25.00
128.00
319.00

420.00
18.90
384.00
17226.00

50.000

9.78

489.00

PH data

Page 1722 of 3205

19610.52
15.62
19626.14
2747.66
22373.80
2237.38

PH data

Page 1723 of 3205

mm
0.280
0.650
1.800

576.00
450.00
384.00

161.28
292.50
691.20

0.650
1.140
3.500
66.000

750.00
25.00
128.00
319.00

487.50
28.50
448.00
21054.00

50.000

12.23

611.50

23774.48
17.56
23792.04
3330.89
27122.93
2712.29
mm
0.360
0.840
1.800

576.00
450.00
384.00

207.36
378.00
691.20

0.750
1.520
4.800
76.000

750.00
25.00
128.00
319.00

562.50
38.00
614.40
24244.00

50.000

14.67

733.50

27468.96
20.10
27489.06
3848.47
31337.53
3133.75
mm
0.400
0.950
2.250

576.00
450.00
384.00

230.40
427.50
864.00

0.930
1.700
6.000
90.000

750.00
25.00
128.00
319.00

697.50
42.50
768.00
28710.00

50.000

17.12

856.00

PH data

Page 1724 of 3205

32595.90
23.78
32619.68
4566.76
37186.44
3718.64

PH data

Page 1725 of 3205

mm
0.310
0.740
2.250

576.00
450.00
384.00

178.56
333.00
864.00

1.120
1.700
7.500
105.000

750.00
25.00
128.00
319.00

840.00
42.50
960.00
33495.00

50.000

19.56

978.00

37691.06
23.54
37714.60
5280.04
42994.64
4299.46
mm
0.540
1.260
2.550

576.00
450.00
384.00

311.04
567.00
979.20

1.210
2.270
9.500
150.000

750.00
25.00
128.00
319.00

907.50
56.75
1216.00
47850.00

50.000

22.01

1100.50

52987.99
29.58
53017.57
7422.46
60440.03
6044.00

PH data

Page 1726 of 3205

mm
0.580
1.370
2.700

576.00
450.00
384.00

334.08
616.50
1036.80

1.310
2.270
10.000
160.000

750.00
25.00
128.00
319.00

982.50
56.75
1280.00
51040.00

50.000

24.45

1222.50

56569.13
32.10
56601.23
7924.17
64525.40
6452.54
mm
0.680
1.570
3.000

576.00
450.00
384.00

391.68
706.50
1152.00

1.680
2.540
12.000
205.000

750.00
25.00
128.00
319.00

1260.00
63.50
1536.00
65395.00

50.000

29.34

1467.00

71971.68
37.17
72008.85
10081.24
82090.09
8209.01
mm
0.770
1.780
3.300

576.00
450.00
384.00

443.52
801.00
1267.20

2.100
3.200
13.500
240.000

750.00
25.00
128.00
319.00

1575.00
80.00
1728.00
76560.00

50.000

34.23

1711.50

PH data

Page 1727 of 3205

84166.22
42.23
84208.45
11789.18
95997.63
9599.76

PH data

Page 1728 of 3205

mm
0.770
1.780
3.300

576.00
450.00
384.00

443.52
801.00
1267.20

2.400
3.500
14.500
270.000

750.00
25.00
128.00
319.00

1800.00
87.50
1856.00
86130.00

50.000

36.68

1834.00

94219.22
43.46
94262.68
13196.78
107459.46
10745.95
mm
0.770
1.780
3.300

576.00
450.00
384.00

443.52
801.00
1267.20

2.330
3.410
15.300
325.000

750.00
25.00
128.00
319.00

1747.50
85.25
1958.40
103675.00

50.000

39.12

1956.00

111933.87
44.68
111978.55
15677.00
127655.55
12765.56

PH data

Page 1729 of 3205

mm
0.300
0.800

450.00
384.00

135.00
307.20
442.20

3.91

195.50

50.000

637.70
1.96
639.66
89.55
729.21
72.92
mm
0.500
1.000

450.00
384.00

225.00
384.00
609.00

50.000

4.89

244.50

853.50
2.45
855.95
119.83
975.78
97.58

PH data

Page 1730 of 3205

mm
0.500
1.000

450.00
384.00

225.00
384.00
609.00

50.000

6.11

305.50

914.50
3.06
917.56
128.46
1046.02
104.60
mm
0.600
1.100

450.00
384.00

270.00
422.40
692.40

50.000

7.34

367.00

1059.40
3.67
1063.07
148.83
1211.90
121.19
mm
0.600
1.100

450.00
384.00

270.00
422.40
692.40

50.000

9.78

489.00

1181.40
4.89
1186.29
166.08
1352.37
135.24
PH data

Page 1731 of 3205

mm
0.620
1.200

450.00
384.00

279.00
460.80
739.80

50.000

12.23

611.50

1351.30
6.12
1357.42
190.04
1547.46
154.75
mm
0.800
1.200

450.00
384.00

360.00
460.80
820.80

50.000

14.67

733.50

1554.30
7.34
1561.64
218.63
1780.27
178.03
mm
0.900
1.500

450.00
384.00

405.00
576.00
981.00

50.000

17.12

856.00

1837.00
8.56
1845.56
258.38
2103.94
210.39
PH data

Page 1732 of 3205

mm
1.000
1.500

450.00
384.00

450.00
576.00
1026.00

50.000

19.56

978.00

2004.00
9.78
2013.78
281.93
2295.71
229.57
mm
1.200
1.700

450.00
384.00

540.00
652.80
1192.80

50.000

22.01

1100.50

2293.30
11.01
2304.31
322.60
2626.91
262.69
mm
1.300
1.800

450.00
384.00

585.00
691.20
1276.20

50.000

24.45

1222.50

2498.70
12.23
2510.93
351.53
2862.46
286.25
PH data

Page 1733 of 3205

mm
1.500
2.000

450.00
384.00

675.00
768.00
1443.00

50.000

29.34

1467.00

2910.00
14.67
2924.67
409.45
3334.12
333.41
mm
1.600
2.100

450.00
384.00

720.00
806.40
1526.40

50.000

31.79

1589.50

3115.90
15.90
3131.80
438.45
3570.25
357.03
mm
1.700
2.200

450.00
384.00

765.00
844.80
1609.80

50.000

34.23

1711.50

3321.30
17.12
3338.42
467.38
3805.80
PH data

Page 1734 of 3205

380.58

PH data

Page 1735 of 3205

mm
1.700
2.200

450.00
384.00

765.00
844.80
1609.80

50.000

36.68

1834.00

3443.80
18.34
3462.14
484.70
3946.84
394.68
mm
2.350
4.700
0.650

576.00
450.00
480.00

1353.60
2115.00
312.00
3780.60

50.000

39.12

1956.00

5736.60
19.56
5756.16
805.86
6562.02
656.20
mm
2.750
5.500
0.700

576.00
450.00
480.00

1584.00
2475.00
336.00
4395.00

50.000

44.01

2200.50

6595.50
22.01
6617.51
PH data

Page 1736 of 3205

926.45
7543.96
754.40

PH data

Page 1737 of 3205

mm
3.000
6.000
0.750

576.00
450.00
480.00

1728.00
2700.00
360.00
4788.00

50.000

48.90

2445.00

7233.00
24.45
7257.45
1016.04
8273.49
827.35

PH data

Page 1738 of 3205

mm
0.090
0.210
0.800

576.00
450.00
384.00

51.84
94.50
307.20
453.54

6.800
2.125
-

123.00
103.00

836.40
218.88

27.500

3.91

107.53

1616.35
5.61
1621.96
227.07
1849.03
184.90
mm
0.150
0.350
1.000

576.00
450.00
384.00

86.40
157.50
384.00
627.90

13.600
2.540

123.00
103.00

1672.80
261.62

27.500

4.89

134.48

2696.80
7.62
2704.42
378.62
3083.04
308.30
mm
0.150
0.350
1.000

576.00
450.00
384.00

86.40
157.50
384.00
627.90
PH data

Page 1739 of 3205

13.600
3.140

123.00
103.00

1672.80
323.42

PH data

Page 1740 of 3205

27.500

6.11

168.03

2792.15
7.96
2800.11
392.02
3192.13
319.21
mm
0.180
0.420
1.100

576.00
450.00
384.00

103.68
189.00
422.40
715.08

24.000
4.300

123.00
103.00

2952.00
442.90

27.500

7.34

201.85

4311.83
9.17
4321.00
604.94
4925.94
492.59
mm
0.180
0.420
1.100

576.00
450.00
384.00

103.68
189.00
422.40
715.08

25.200
6.160

123.00
103.00

3099.60
634.48

27.500

9.78

268.95

4718.11
9.84
4727.95
661.91
5389.86
538.99
PH data

Page 1741 of 3205

mm
0.200
0.420
1.200

576.00
450.00
384.00

115.20
189.00
460.80
765.00

39.600
8.500

123.00
103.00

4870.80
875.50

27.500

12.23

336.33

6847.63
11.01
6858.64
960.21
7818.85
781.89
mm
0.240
0.560
1.200

576.00
450.00
384.00

138.24
252.00
460.80
851.04

39.600

123.00

4870.80

10.280

103.00

1058.84

27.500

14.67

403.43

7184.11
12.54
7196.65
1007.53
8204.18
820.42

PH data

Page 1742 of 3205

mm
0.300
0.600
1.500

576.00
450.00
384.00

172.80
270.00
576.00
1018.80

54.400
21.260

123.00
103.00

6691.20
2189.78

27.500

17.12

470.80

10370.58
14.90
10385.48
1453.97
11839.45
1183.95
mm
0.300
0.700
1.500

576.00
450.00
384.00

172.80
315.00
576.00
1063.80

98.400
27.640

123.00
103.00

12103.20
2846.92

27.500

19.56

537.90

16551.82
16.02
16567.84
2319.50
18887.34
1888.73

PH data

Page 1743 of 3205

mm
0.360
0.840
1.700

576.00
450.00
384.00

207.36
378.00
652.80
1238.16

123.000
22.660

123.00
103.00

15129.00
2333.98

27.500

22.01

605.28

19306.42
18.43
19324.85
2705.48
22030.33
2203.03
mm
0.390
0.910
1.800

576.00
450.00
384.00

224.64
409.50
691.20
1325.34

134.000
38.190

123.00
103.00

16482.00
3933.57

27.500

24.45

672.38

22413.29
19.98
22433.27
3140.66
25573.93
2557.39

PH data

Page 1744 of 3205

mm
0.450
1.050
2.000

576.00
450.00
384.00

259.20
472.50
768.00
1499.70

192.000
51.710

123.00
103.00

23616.00
5326.13

27.500

29.34

806.85

31248.68
23.07
31271.75
4378.05
35649.80
3564.98
mm
0.510
1.190
2.200

576.00
450.00
384.00

293.76
535.50
844.80
1674.06

244.800
68.910

123.00
103.00

30110.40
7097.73

27.500

34.23

941.33

39823.52
26.15
39849.67
5578.95
45428.62
4542.86

PH data

Page 1745 of 3205

mm
0.510
1.190
2.200

576.00
450.00
384.00

293.76
535.50
844.80
1674.06

260.400
78.430

123.00
103.00

32029.20
8078.29

27.500

36.68

1008.70

42790.25
26.83
42817.08
5994.39
48811.47
4881.15

RCC-NP2

mm
0.780
1.800
5.000
1.300

504.00
450.00
384.00
384.00

393.12
810.00
1920.00
499.20
3622.32

50.000

3.63

181.50

100.000

3.91

391.00

4194.82
40.13
4234.95
592.89
4827.84
48.28

PH data

Page 1746 of 3205

mm
0.960
2.240
6.300
1.600

504.00
450.00
384.00
384.00

483.84
1008.00
2419.20
614.40
4525.44

50.000

41.13

2056.50

100.000

4.89

489.00

7070.94
50.14
7121.08
996.95
8118.03
81.18
mm
1.170
2.730
7.800
1.600

504.00
450.00
384.00
384.00

589.68
1228.50
2995.20
614.40
5427.78

50.000

74.03

3701.50

100.000

7.34

734.00

9863.28
61.62
9924.90
1389.49
11314.39
113.14

PH data

Page 1747 of 3205

mm
1.170
2.730
7.800
1.600

504.00
450.00
384.00
384.00

589.68
1228.50
2995.20
614.40
5427.78

50.000

86.95

4347.50

100.000

9.78

978.00

10753.28
64.06
10817.34
1514.43
12331.77
123.32
mm
1.620
3.780
10.500
2.300

504.00
450.00
384.00
384.00

816.48
1701.00
4032.00
883.20
7432.68

50.000

95.18

4759.00

100.000

11.00

1100.00

13291.68
85.33
13377.01
1872.78
15249.79
152.50

PH data

Page 1748 of 3205

mm
1.620
3.780
10.500
2.300

504.00
450.00
384.00
384.00

816.48
1701.00
4032.00
883.20
7432.68

50.000

106.93

5346.50

100.000

12.23

1223.00

14002.18
86.56
14088.74
1972.42
16061.16
160.61
mm
1.750
4.140
11.600
2.300

504.00
450.00
384.00
384.00

882.00
1863.00
4454.40
883.20
8082.60

40.000

130.43

5217.20

100.000

14.67

1467.00

14766.80
95.50
14862.30
2080.72
16943.02
169.43

PH data

Page 1749 of 3205

mm
1.900
4.500
12.700
2.400

504.00
450.00
384.00
384.00

957.60
2025.00
4876.80
921.60
8781.00

40.000

151.58

6063.20

100.000

17.12

1712.00

16556.20
104.93
16661.13
2332.56
18993.69
189.94
mm
2.100
4.900
13.900
2.900

504.00
450.00
384.00
384.00

1058.40
2205.00
5337.60
1113.60
9714.60

40.000

166.85

6674.00

100.000

19.56

1956.00

18344.60
116.71
18461.31
2584.58
21045.89
210.46

PH data

Page 1750 of 3205

mm
2.250
5.250
15.000
3.300

504.00
450.00
384.00
384.00

1134.00
2362.50
5760.00
1267.20
10523.70

40.000

189.18

7567.20

100.000

22.01

2201.00

20291.90
127.25
20419.15
2858.68
23277.83
232.78
mm
2.430
5.670
16.200
3.300

504.00
450.00
384.00
384.00

1224.72
2551.50
6220.80
1267.20
11264.22

40.000

246.75

9870.00

100.000

24.45

2445.00

23579.22
137.09
23716.31
3320.28
27036.59
270.37
mm
2.750
6.450
16.300
3.300

504.00
450.00
384.00
384.00

1386.00
2902.50
6259.20
1267.20
11814.90

40.000

324.30

12972.00

100.000

29.34

2934.00

27720.90
PH data

Page 1751 of 3205

147.49
27868.39
3901.57
31769.96
317.70
RCC-NP3
mm
1.750
4.140
11.600
2.300

504.00
450.00
384.00
384.00

882.00
1863.00
4454.40
883.20
8082.60

40.000

168.03

6721.20

100.000

14.67

1467.00

16270.80
95.50
16366.30
2291.28
18657.58
186.58
mm
1.900
4.500
12.700
2.400

504.00
450.00
384.00
384.00

957.60
2025.00
4876.80
921.60
8781.00

40.000

200.93

8037.20

100.000

17.12

1712.00

18530.20
104.93
18635.13
2608.92
21244.05
212.44

PH data

Page 1752 of 3205

mm
2.100
4.900
13.900
2.900

100.000

504.00
450.00
384.00
384.00

1058.40
2205.00
5337.60
1113.60
9714.60

227.95

0.00

19.56

1956.00

11670.60
116.71
11787.31
1650.22
13437.53
134.38
mm
2.250
5.250
15.000
3.300

100.000

504.00
450.00
384.00
384.00

1134.00
2362.50
5760.00
1267.20
10523.70

258.50

0.00

22.01

2201.00

12724.70
127.25
12851.95
1799.27
14651.22
146.51

PH data

Page 1753 of 3205

mm
2.430
5.670
16.200
3.300

100.000

504.00
450.00
384.00
384.00

1224.72
2551.50
6220.80
1267.20
11264.22

296.10

0.00

24.45

2445.00

13709.22
137.09
13846.31
1938.48
15784.79
157.85
mm
2.750
6.450
16.300
3.300

504.00
450.00
384.00
384.00

1386.00
2902.50
6259.20
1267.20
11814.90

40.000

430.05

17202.00

100.000

29.34

2934.00

31950.90
147.49
32098.39
4493.77
36592.16
365.92

0.060
0.160
2.500

450.00
384.00
106.35

27.00
61.44
265.88
354.32
PH data

Page 1754 of 3205

10.000

102.00

1020.00

1374.32
0.88
1375.20
192.53
1567.73
15.68

PH data

Page 1755 of 3205

0.060
0.160
2.500

450.00
384.00
106.35

10.000

117.00

27.00
61.44
265.88
354.32
1170.00

1790.20
0.27
1790.47
250.67
2041.14
20.41

0.120
0.250
2.500

450.00
384.00
106.35

10.000

149.00

54.00
96.00
265.88
415.88
1490.00

2171.76
0.54
2172.30
304.12
2476.42
24.76

0.120
0.250
2.500

450.00
384.00
106.35

10.000

220.00

54.00
96.00
265.88
415.88
2200.00

2881.76
0.54
2882.30
403.52
3285.82
32.86

PH data

Page 1756 of 3205

0.160
0.330
2.500

450.00
384.00
106.35

10.000

250.00

72.00
126.72
265.88
464.60
2500.00

PH data

Page 1757 of 3205

3230.48
0.72
3231.20
452.37
3683.57
36.84

0.160
0.330
2.500

450.00
384.00
106.35

10.000

258.00

72.00
126.72
265.88
464.60
2580.00
10.00

3320.48
0.72
3321.20
464.97
3786.17
37.86

0.250
0.660
2.500

450.00
384.00
106.35

10.000

339.30

112.50
253.44
265.88
631.82
3393.00
10.00

4300.70
1.13
4301.83
602.26
4904.09
49.04

0.250
0.660
2.500

450.00
384.00
106.35

10.000

376.80

112.50
253.44
265.88
631.82
3768.00

PH data

Page 1758 of 3205

4665.70
1.13
4666.83
653.36
5320.19
53.20

0.370
0.970
2.500

450.00
384.00
106.35

10.000

496.90

166.50
372.48
265.88
804.86
4969.00
10.00

6049.74
1.67
6051.41
847.20
6898.61
68.99

PH data

Page 1759 of 3205

0.580
1.540
2.500

450.00
384.00
106.35

10.000

746.75

261.00
591.36
265.88
1118.24
7467.50

8851.62
2.61
8854.23
1239.59
10093.82
100.94

0.330
0.330

450.00
384.00

148.50
126.72

1.000
1.000

289.20
12.00

289.20
12.00
10.00

586.42
2.75
589.17
82.48
671.65

0.450
0.450

450.00
384.00

202.50
172.80

1.000
1.000

590.90
15.00

590.90
15.00
10.00

991.20
3.75

PH data

Page 1760 of 3205

994.95
139.29
1134.24

0.450
0.450

450.00
384.00

202.50
172.80

1.000
1.000

1417.00
20.00

1417.00
20.00
10.00

1822.30
3.75
1826.05
255.65
2081.70

PH data

Page 1761 of 3205

May not be concidered

6.225

1.316

8.19
1.15
9.34

7.990

1.316

10.51
1.47
11.98

10.262

1.316

13.50
1.89
15.39

13.665

1.316

17.98
2.52
20.50

22.200

1.316

29.22
4.09
33.31

28.450

1.316

37.44
5.24
42.68

38.562

1.316

50.75
7.11
57.86

47.237

1.316

62.16
8.70
70.86

PH data

Page 1762 of 3205

60.275

1.316

79.32
11.10
90.42

PH data

Page 1763 of 3205

71.625

1.316

94.26
13.20
107.46

88.725

1.316

116.76
16.35
133.11

125.262

1.316

164.84
23.08
187.92

7.378

1.316

9.71
1.36
11.07

11.587

1.316

15.25
2.14
17.39

15.087

1.316

19.85
2.78
22.63

21.275

1.316

28.00
3.92
31.92

36.425

1.316

47.94
6.71
54.65

46.412

1.316

61.08
8.55
69.63

66.075

1.316

86.95
PH data

Page 1764 of 3205

12.17
99.12

76.412

1.316

100.56
14.08
114.64

104.225

1.316

137.16
19.20
156.36

125.360

1.316

164.97
23.10
188.07

153.800

1.316

202.40
28.34
230.74

219.412

1.316

288.75
40.43
329.18

May not be concidered

1200.00

3600.00

0.05
3

500.00
151.00
500.00
1500.00
57.00

25.00
453.00
500.00
150.00
3420.00
8148.00
16.30
0.36

0.1
60

PH data

Page 1765 of 3205

0.180
0.420
1.600

576.00
450.00
384.00

103.68
189.00
614.40

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.300
0.700
2.000

576.00
450.00
384.00

172.80
315.00
768.00

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.300
0.700
2.000

576.00
450.00
384.00

172.80
315.00
768.00

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.360
0.840
2.200

576.00
450.00
384.00

207.36
378.00
844.80

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.360

576.00

207.36
PH data

Page 1766 of 3205

0.840
2.200

450.00
384.00

378.00
844.80

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.480
1.120
2.600

576.00
450.00
384.00

276.48
504.00
998.40

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.480
1.120
2.600

576.00
450.00
384.00

276.48
504.00
998.40

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.600
1.400
3.000

576.00
450.00
384.00

345.60
630.00
1152.00

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.600
1.400

576.00
450.00

345.60
630.00
PH data

Page 1767 of 3205

3.000

384.00

1152.00

40.000

#NAME?

#NAME?
#NAME?

PH data

Page 1768 of 3205

#NAME?
#NAME?
#NAME?
#NAME?

0.720
1.680
3.400

576.00
450.00
384.00

414.72
756.00
1305.60

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.720
1.680
3.400

576.00
450.00
384.00

414.72
756.00
1305.60

PH data

Page 1769 of 3205

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

0.840
1.960
3.800

576.00
450.00
384.00

483.84
882.00
1459.20

40.000

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

7.000

384.00

2688.00

2.000
4.000

576.00
384.00

1152.00
1536.00
5376.00

500.000

7.82

3910.00

mm

9286.00
92.86
9378.86
1313.04
10691.90
21.38
2.14

6.300

2.14

Rs

13.48
1.89
15.37
15.40

PH data

Page 1770 of 3205

7.500

2.14

Rs

9.000

2.14

Rs

11.000

2.14

Rs

12.500

2.14

Rs

16.05
2.25
18.30
18.30

19.26
2.70
21.96
22.00

23.54
3.30
26.84
26.85

26.75
3.75
30.50
30.50

PH data

Page 1771 of 3205

14.000

2.14

Rs

16.000

2.14

Rs

18.000

2.14

Rs

20.000

2.14

Rs

22.500

2.14

Rs

25.000

2.14

Rs

28.000

2.14

Rs

31.500

2.14

Rs

29.96
4.19
34.15
34.15

34.24
4.79
39.03
39.05

38.52
5.39
43.91
43.95

42.80
5.99
48.79
48.80

48.15
6.74
54.89
54.90

53.50
7.49
60.99
61.00

59.92
8.39
68.31
68.35

67.41
9.44
76.85
76.85

May not be concidered

PH data

Page 1772 of 3205

4.000

384.000

1536.00

1.000
2.000

576.000
384.000

576.00
768.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

4.000
8.000

35.000
57.00

140.00
456.00

1.000

1000.000

1000.00
996.35
8113.150
16.90

4.000

384.000

1536.00

1.000
2.000

576.000
384.000

576.00
768.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

4.000
8.000

35.000
57.000

140.00
456.00

1.000

1000.000

1000.00
996.35
8113.150
17.79

5.000

384.000

1920.00

1.000
2.000

576.000
384.000

576.00
768.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

PH data

Page 1773 of 3205

1.000

816.800

816.80

5.000
8.000

35.000
57.000

175.00
456.00

1.000

1000.000

1000.00
1055.01
8590.810
19.89

PH data

Page 1774 of 3205

6.000

384.000

2304.00

1.000
2.000

576.000
384.000

576.00
768.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

6.000
8.000

35.000
57.000

210.00
456.00

1.000

1000.000

1000.00
1113.67
9068.470
23.62

7.000

384.000

2688.00

2.000
3.000

576.000
384.000

1152.00
1152.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

7.000
8.000

35.000
57.000

245.00
456.00

1.000

1000.000

1000.00
1306.73
10640.530
30.58

7.000

384.000

2688.00

2.000
3.000

576.000
384.000

1152.00
1152.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80
PH data

Page 1775 of 3205

8.000
8.000

35.000
57.000

280.00
456.00

1.000

1000.000

1000.00
1311.63
10680.430
35.60

PH data

Page 1776 of 3205

7.000

384.000

2688.00

2.000
4.000

576.000
384.000

1152.00
1536.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

9.000
8.000

35.000
57.000

315.00
456.00

1.000

1000.000

1000.00
1370.29
11158.090
36.83

8.000

384.000

3072.00

2.000
4.000

576.000
384.000

1152.00
1536.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

10.000
8.000

35.000
57.000

350.00
456.00

1.000

1000.000

1000.00
1428.95
11635.750
48.48

PH data

Page 1777 of 3205

10.000

384.000

3840.00

2.000
6.000

576.000
384.000

1152.00
2304.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

11.000
8.000

35.000
57.000

385.00
456.00

1.000

1000.000

1000.00
1648.89
13426.690
55.94

10.000

384.000

3840.00

2.000
6.000

576.000
384.000

1152.00
2304.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

12.000
8.000

35.000
57.000

420.00
456.00

1.000

1000.000

1000.00
1653.79
13466.590
62.35

11.000

384.000

4224.00

2.000
6.000

576.000
384.000

1152.00
2304.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80
PH data

Page 1778 of 3205

13.000
8.000

35.000
57.000

455.00
456.00

1.000

1000.000

1000.00
1712.45
13944.250
64.56

12.000

384.000

4608.00

2.000
6.000

576.000
384.000

1152.00
2304.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

14.000
8.000

35.000
57.000

490.00
456.00

1.000

1000.000

1000.00
1771.11
14421.910
75.11

12.000

384.000

4608.00

2.000
6.000

576.000
384.000

1152.00
2304.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

15.000
8.000

35.000
57.000

525.00
456.00

1.000

1000.000

1000.00
1776.01
14461.810
80.34

14.000

384.000

5376.00

2.000

576.000

1152.00
PH data

Page 1779 of 3205

8.000

384.000

3072.00

1.000
2.000
1.000

576.000
384.000
480.000

576.00
768.00
480.00

1.000

816.800

816.80

16.000
8.000

35.000
57.000

560.00
456.00

1.000

1000.000

1000.00
1995.95
16252.750
112.87

PH data

Page 1780 of 3205

0.600
1.400
3.000
1.000

576.00
450.00
384.00
384.00

345.60
630.00
1152.00
384.00
2511.60
0.00

5740.00
791.93
128.00

373.10
35.64
576.00
3496.34
25.12

50.000
0.065
0.045
4.500

3521.46
493.00
4014.46
133.82
133.85

0.900
2.100
4.000
1.000

576.00
450.00
384.00
384.00

50.000
0.097
0.068
9.000

5740.00
791.93
128.00

518.40
945.00
1536.00
384.00
3383.40
0.00
556.78
53.85
1152.00
5146.03
33.83
5179.86
725.18
5905.04
196.83
196.85

PH data

Page 1781 of 3205

1.050
2.450
4.500
1.250

576.00
450.00
384.00
384.00

50.000
0.130
0.091
12.000

5740.00
791.93
128.00

604.80
1102.50
1728.00
480.00
3915.30
0.00
746.20
72.07
1536.00
6269.57
39.15
6308.72
883.22
7191.94
239.73
239.75

1.200
2.800
5.000
1.500

576.00
450.00
384.00
384.00

50.000
0.146
0.102
13.500

5740.00
791.93
128.00

1.350
3.150
5.500
1.500

576.00
450.00
384.00
384.00

50.000
0.162
0.113
15.000

5740.00
791.93
128.00

691.20
1260.00
1920.00
576.00
4447.20
0.00
838.04
80.78
1728.00
7094.02
44.47
7138.49
999.39
8137.88
271.26
271.30

777.60
1417.50
2112.00
576.00
4883.10
0.00
929.88
89.49
1920.00
7822.47
48.83
7871.30
1101.98
8973.28
299.11
299.15

PH data

Page 1782 of 3205

1.500
3.500
6.000
1.500

576.00
450.00
384.00
384.00

50.000
0.194
0.136
18.000

5740.00
791.93
128.00

864.00
1575.00
2304.00
576.00
5319.00
0.00
1113.56
107.70
2304.00
8844.26
53.19
8897.45
1245.64
10143.09
338.10
338.10

1.650
3.850
7.000
1.750

576.00
450.00
384.00
384.00

50.000
0.225
0.159
21.000

5740.00
791.93
128.00

950.40
1732.50
2688.00
672.00
6042.90
0.00
1291.50
125.92
2688.00
10148.32
60.43
10208.75
1429.23
11637.98
387.93
387.95

PH data

Page 1783 of 3205

1.800
4.200
8.000
1.750

576.00
450.00
384.00
384.00

50.000
0.256
0.181
24.000

5740.00
791.93
128.00

1036.80
1890.00
3072.00
672.00
6670.80
0.00
1469.44
143.34
3072.00
11355.58
66.71
11422.29
1599.12
13021.41
434.05
434.05

2.100
4.900
10.000
2.000

576.00
450.00
384.00
384.00

50.000
0.293
0.204
27.000

5740.00
791.93
128.00

1209.60
2205.00
3840.00
768.00
8022.60
0.00
1681.82
161.55
3456.00
13321.97
80.23
13402.20
1876.31
15278.51
509.28
509.30

0.600
1.400
3.000
1.000

576.00
450.00
384.00
384.00

345.60
630.00
1152.00
384.00
2511.60
0.00

5740.00
791.93
128.00

373.10
35.64
576.00
3496.34
25.12

50.000
0.065
0.045
4.500

3521.46
493.00
PH data

Page 1784 of 3205

4014.46
133.82
133.85

PH data

Page 1785 of 3205

0.900
2.100
4.000
1.000

576.00
450.00
384.00
384.00

50.000
0.097
0.068
9.000

5740.00
791.93
128.00

518.40
945.00
1536.00
384.00
3383.40
0.00
556.78
53.85
1152.00
5146.03
33.83
5179.86
725.18
5905.04
196.83
196.85

1.050
2.450
4.500
1.250

576.00
450.00
384.00
384.00

50.000
0.130
0.091
12.000

5740.00
791.93
128.00

604.80
1102.50
1728.00
480.00
3915.30
0.00
746.20
72.07
1536.00
6269.57
39.15
6308.72
883.22
7191.94
239.73
239.75

1.200
2.800
5.000
1.500

576.00
450.00
384.00
384.00

50.000
0.146
0.102
13.500

5740.00
791.93
128.00

691.20
1260.00
1920.00
576.00
4447.20
0.00
838.04
80.78
1728.00
7094.02
44.47
7138.49
999.39
8137.88
271.26
271.30
PH data

Page 1786 of 3205

1.350
3.150
5.500
1.500

576.00
450.00
384.00
384.00

50.000
0.162
0.113
15.000

5740.00
791.93
128.00

777.60
1417.50
2112.00
576.00
4883.10
0.00
929.88
89.49
1920.00
7822.47
48.83
7871.30
1101.98
8973.28
299.11
299.15

1.500
3.500
6.000
1.500

576.00
450.00
384.00
384.00

50.000
0.194
0.136
18.000

5740.00
791.93
128.00

864.00
1575.00
2304.00
576.00
5319.00
0.00
1113.56
107.70
2304.00
8844.26
53.19
8897.45
1245.64
10143.09
338.10
338.10

1.650
3.850
7.000
1.750

576.00
450.00
384.00
384.00

50.000
0.225
0.159
21.000

5740.00
791.93
128.00

950.40
1732.50
2688.00
672.00
6042.90
0.00
1291.50
125.92
2688.00
10148.32
60.43
10208.75
1429.23
11637.98
387.93
387.95
PH data

Page 1787 of 3205

1.800
4.200
8.000
1.750

576.00
450.00
384.00
384.00

50.000
0.256
0.181
24.000

5740.00
791.93
128.00

1036.80
1890.00
3072.00
672.00
6670.80
0.00
1469.44
143.34
3072.00
11355.58
66.71
11422.29
1599.12
13021.41
434.05
434.05

2.100
4.900
10.000
2.000

576.00
450.00
384.00
384.00

50.000
0.293
0.204
27.000

5740.00
791.93
128.00

1209.60
2205.00
3840.00
768.00
8022.60
0.00
1681.82
161.55
3456.00
13321.97
80.23
13402.20
1876.31
15278.51
509.28
509.30

PH data

Page 1788 of 3205

0.600
1.400
3.000
1.000

576.00
450.00
384.00
384.00

345.60
630.00
1152.00
384.00
2511.60
0.00

5740.00
791.93
128.00

373.10
35.64
576.00
3496.34
25.12

50.000
0.065
0.045
4.500

3521.46
493.00
4014.46
133.82
133.85

0.900
2.100
4.000
1.000

576.00
450.00
384.00
384.00

50.000
0.097
0.068
9.000

5740.00
791.93
128.00

518.40
945.00
1536.00
384.00
3383.40
0.00
556.78
53.85
1152.00
5146.03
33.83
5179.86
725.18
5905.04
196.83
196.85

1.050
2.450
4.500
1.250

576.00
450.00
384.00
384.00

50.000
0.130
0.091
12.000

5740.00
791.93
128.00

604.80
1102.50
1728.00
480.00
3915.30
0.00
746.20
72.07
1536.00
6269.57
39.15
6308.72
883.22
7191.94
PH data

Page 1789 of 3205

239.73
239.75

1.200
2.800
5.000
1.500

576.00
450.00
384.00
384.00

50.000
0.146
0.102
13.500

5740.00
791.93
128.00

691.20
1260.00
1920.00
576.00
4447.20
0.00
838.04
80.78
1728.00
7094.02
44.47
7138.49
999.39
8137.88
271.26
271.30

1.350
3.150
5.500
1.500

576.00
450.00
384.00
384.00

50.000
0.162
0.113
15.000

5740.00
791.93
128.00

777.60
1417.50
2112.00
576.00
4883.10
0.00
929.88
89.49
1920.00
7822.47
48.83
7871.30
1101.98
8973.28
299.11
299.15

1.500
3.500
6.000
1.500

576.00
450.00
384.00
384.00

50.000
0.194
0.136
18.000

5740.00
791.93
128.00

864.00
1575.00
2304.00
576.00
5319.00
0.00
1113.56
107.70
2304.00
8844.26
53.19
8897.45
1245.64
10143.09
PH data

Page 1790 of 3205

338.10
338.10

1.650
3.850
7.000
1.750

576.00
450.00
384.00
384.00

50.000
0.225
0.159
21.000

5740.00
791.93
128.00

950.40
1732.50
2688.00
672.00
6042.90
0.00
1291.50
125.92
2688.00
10148.32
60.43
10208.75
1429.23
11637.98
387.93
387.95

1.800
4.200
8.000
1.750

576.00
450.00
384.00
384.00

50.000
0.256
0.181
24.000

5740.00
791.93
128.00

1036.80
1890.00
3072.00
672.00
6670.80
0.00
1469.44
143.34
3072.00
11355.58
66.71
11422.29
1599.12
13021.41
434.05
434.05

2.100
4.900
10.000
2.000

576.00
450.00
384.00
384.00

50.000
0.293
0.204
27.000

5740.00
791.93
128.00

1209.60
2205.00
3840.00
768.00
8022.60
0.00
1681.82
161.55
3456.00
13321.97
80.23
13402.20
1876.31
15278.51
PH data

Page 1791 of 3205

509.28
509.30

0.465
1.094
2.480

576.00
450.00
384.00

267.84
492.30
952.32
1712.46
2.45

PH data

Page 1792 of 3205

35.470

2.45

86.90
12.17
99.07

47.100

2.45

115.40
16.16
131.56

61.770

2.45

151.34
21.19
172.53

79.830

2.45

195.58
27.38
222.96

131.700

2.45

322.67
45.17
367.84

187.160

2.45

458.54
64.20
522.74

266.460

2.45

652.83
91.40
744.23

450.000

2.45

1102.50
154.35
1256.85

552.500

2.45

1353.63
189.51
PH data

Page 1793 of 3205

1543.14

722.500

2.45

1770.13
247.82
2017.95

PH data

Page 1794 of 3205

837.500

2.45

2051.88
287.26
2339.14

1422.500

2.45

3485.13
487.92
3973.05

20.000
0.180
0.180

2.45
450.00
384.00

49.00
81.00
69.12
27.88
227.00

27.000

2.45

66.15

0.140
0.140

450.00
384.00

63.00
53.76
16.35
133.11

20.000

2.45

49.00

0.110
0.110

450.00
384.00

49.50
42.24
12.84
104.58

0.750
1.750
4.000

576.00
450.00
384.00

432.00
787.50
1536.00
385.77
3141.27

PH data

Page 1795 of 3205

0.750
1.750
4.000

504.00
450.00
384.00

378.00
787.50
1536.00
378.21
3079.71

0.500
4.000

450.00
384.00

225.00
1536.00

0.373
0.379

750.00
25.00

279.75
9.48
2050.23
287.03
2337.26
58.05

0.630
4.500

450.00
384.00

283.50
1728.00

0.466
0.379

750.00
25.00

349.50
9.48
2370.48
331.87
2702.35
67.12
67.15

0.760
5.000

450.00
384.00

342.00
1920.00

0.559
0.562

750.00
25.00

419.25
14.05
2695.30
377.34
3072.64
76.32

PH data

Page 1796 of 3205

0.830
5.500

450.00
384.00

373.50
2112.00

0.663
0.568

750.00
25.00

497.25
14.20
2996.95
419.57
3416.52
84.86
84.90

1.100
6.500

450.00
384.00

495.00
2496.00

0.840
0.757

750.00
25.00

630.00
18.93
3639.93
509.59
4149.52
103.07
103.10

1.300
7.500

450.00
384.00

585.00
2880.00

1.026
1.137

750.00
25.00

769.50
28.41
4262.91
596.81
4859.72
120.71
120.75

1.500
8.500

450.00
384.00

675.00
3264.00

1.120
1.515

750.00
25.00

840.00
37.88
4816.88
674.36
5491.24
136.39

1.750
9.500

450.00
384.00

787.50
3648.00

1.231

750.00

923.25
PH data

Page 1797 of 3205

1.515

25.00

37.88
5396.63
755.53
6152.16
152.81

PH data

Page 1798 of 3205

2.000
10.500

450.00
384.00

900.00
4032.00

1.306
1.894

750.00
25.00

979.50
47.35
5958.85
834.24
6793.09
168.73

2.250
11.500

450.00
384.00

1012.50
4416.00

1.400
2.273

750.00
25.00

1050.00
56.83
6535.33
914.95
7450.28
185.05

2.500
12.500

450.00
384.00

1125.00
4800.00

1.492
2.652

750.00
25.00

1119.00
66.30
7110.30
995.44
8105.74
201.33

3.000
14.500

450.00
384.00

1350.00
5568.00

1.580
3.410

750.00
25.00

1185.00
85.25
8188.25
1146.36
9334.61
231.86

PH data

Page 1799 of 3205

0.100
0.400
0.450

450.00
384.00
384.00

45.00
153.60
172.80
52.00
423.40
42.34

0.100
0.490
0.560

450.00
384.00
384.00

45.00
188.16
215.04
62.75
510.95
51.09

0.100
0.490
0.670

450.00
384.00
384.00

45.00
188.16
257.28
68.66
559.10
55.91

0.100
0.490
0.790

450.00
384.00
384.00

45.00
188.16
303.36
75.11
611.63
61.16

0.490
0.360

384.00
384.00

188.16
138.24
45.70
372.10
37.21

0.490
0.450

384.00
384.00

188.16
172.80
50.53
411.49
PH data

Page 1800 of 3205

41.15

PH data

Page 1801 of 3205

0.490
0.510

384.00
384.00

188.16
195.84
53.76
437.76
43.78

0.490
0.540

384.00
384.00

188.16
207.36
55.37
450.89
45.09

0.490
0.570

384.00
384.00

188.16
218.88
56.99
464.03
46.40

0.490
0.630

384.00
384.00

188.16
241.92
60.21
490.29
49.03

0.490
0.690

384.00
384.00

188.16
264.96
63.44
516.56
51.66

0.660
0.750

384.00
384.00

253.44
288.00
75.80
617.24
61.72

0.660
0.810

384.00
384.00

253.44
311.04
79.03
643.51
64.35

PH data

Page 1802 of 3205

0.130

504.00

65.52
9.17
74.69
7.47

0.260

504.00

131.04
18.35
149.39
14.94

0.060
0.060

450.00
384.00

27.00
23.04
7.01
57.05

0.080
0.080

450.00
384.00

36.00
30.72
9.34
76.06

0.110
0.110

450.00
384.00

49.50
42.24
12.84
104.58

0.150
0.150

450.00
384.00

67.50
57.60
17.51
142.61

0.200
0.200

450.00
384.00

90.00
76.80
23.35
190.15

PH data

Page 1803 of 3205

0.250
0.250

450.00
384.00

112.50
96.00
29.19
237.69

0.300
0.300

450.00
384.00

135.00
115.20
35.03
285.23

0.350
0.350

450.00
384.00

157.50
134.40
40.87
332.77

0.400
0.400

450.00
384.00

180.00
153.60
46.70
380.30

0.450
0.450

450.00
384.00

202.50
172.80
52.54
427.84

0.500
0.500

450.00
384.00

225.00
192.00
58.38
475.38

0.600
0.600

450.00
384.00

270.00
230.40
70.06
570.46

0.130

504.00

65.52
9.17
74.69

0.150

504.00

75.60
10.58
86.18

PH data

Page 1804 of 3205

0.170

504.00

85.68
12.00
97.68

PH data

Page 1805 of 3205

0.570
1.100

450.00
384.00

256.50
422.40

0.110
0.160

23000.00
3825.00
(-)

2530.00
612.00
628.40
3192.50
446.95
3639.45
80.88

0.500
1.320

450.00
384.00

225.00
506.88

0.110

23000.00

2530.00

0.220

3825.00

841.50

(-)

674.30
3429.08
480.07
3909.15
86.87

PH data

Page 1806 of 3205

7.50
10.98

130.00
130.00

399.59
585.00
984.59
196.92

0.500

384.00

192.00
3.89
3.89
55.54
452.24
150.75

0.750
0.250
2.000
2.000

504.00
450.00
384.00
384.00

378.00
112.50
768.00
768.00

1.000
0.500

200.00
292.38

200.00
146.19

0.920

3487.46

3208.46

0.100

4868.90

486.89
6068.04
20.27

1%

6088.31
852.36
6940.67

PH data

Page 1807 of 3205

105.000

384.00

40320.00
40320.00
20160.00

70.000
35.000

384.00
450.00

26880.00
15750.00

16.000
56.000
56.000
70.000

870.00
1145.10
1149.60
57.00

13920.00
64125.60
64377.60
3990.00
26466.05
215509.25
107754.62

56.000
35.000

384.00
450.00

21504.00
15750.00

56.000
56.000
56.000
105.000

870.00
1145.10
1149.60
57.00

48720.00
64125.60
64377.60
5985.00
30864.71
251326.91
125663.45

56.000
35.000

384.00
450.00

21504.00
15750.00

56.000
56.000
56.000
140.000

870.00
1145.10
1149.60
57.00

48720.00
64125.60
64377.60
7980.00
31144.01
253601.21
126800.60

64.000
40.000

384.00
450.00

24576.00
18000.00

64.000
64.000
64.000
140.000

870.00
1145.10
1149.60
57.00

55680.00
73286.40
73574.40
7980.00
PH data

Page 1808 of 3205

35433.55
288530.35
144265.18

168.000

384.00

64512.00
64512.00
32256.00

178.000
11.000

384.00
450.00

68352.00
4950.00

88.000
88.000
440.000

870.00
1149.60
57.00

76560.00
101164.80
25080.00
38654.95
347017.75
173508.88

157.000
48.000
12.000

384.00
450.00
450.00

60288.00
21600.00
5400.00

96.000
102.000
96.000
1056.000

870.00
1145.10
1149.60
57.00

83520.00
116800.20
110361.60
60192.00
64142.65
522304.45
261152.23

195.000
120.000
15.000

384.00
450.00
450.00

74880.00
54000.00
6750.00

120.000
124.000
120.000
1334.000

870.00
1145.10
1149.60
57.00

104400.00
141992.40
137952.00
76038.00
83441.74
679454.14
339727.07

272.000
204.000
17.000

384.00
450.00
450.00

104448.00
91800.00
7650.00
PH data

Page 1809 of 3205

124.000
124.000
136.000
1344.000

870.00
1145.10
1149.60
57.00

107880.00
141992.40
156345.60
76608.00
96141.36
782865.36
391432.68

PH data

Page 1810 of 3205

360.000
288.000
24.000

384.00
450.00
450.00

138240.00
129600.00
10800.00

192.000
198.000
160.000
2148.000

870.00
1145.10
1149.60
57.00

167040.00
226729.80
183936.00
122436.00
137029.45
1115811.25
391512.72

32.000
64.000

384.00
450.00

12288.00
28800.00

4.00
32.00
32.00
120.00

100.00
870.00
1145.10
57.00

400.00
27840.00
36643.20
6840.00
15793.57
128604.77
64302.38

40.000
80.000

384.00
450.00

15360.00
36000.00

5.00
40.00
40.00
150.00

100.00
870.00
1145.10
57.00

500.00
34800.00
45804.00
8550.00
19741.96
160755.96
80377.98

48.000
96.000

384.00
450.00

18432.00
43200.00

6.00
48.00
48.00
180.00

100.00
870.00
1145.10
57.00

600.00
41760.00
54964.80
10260.00
23690.35
192907.15
96453.58

PH data

Page 1811 of 3205

56.000
112.000

384.00
450.00

21504.00
50400.00

7.00
56.00
56.00
210.00

100.00
870.00
1145.10
57.00

700.00
48720.00
64125.60
11970.00
27638.74
225058.34
112529.17

64.000
128.000

384.00
450.00

24576.00
57600.00

8.00
64.00
64.00
240.00

100.00
870.00
1145.10
57.00

800.00
55680.00
73286.40
13680.00
31587.14
257209.54
128604.77

42.000

384.00

16128.00

2.450
105.000

57.90
15.00

141.86
1575.00

2.450
18900

106.35
0.05

260.56
945.00
2667.06
21717.48
62.05

60.000

384.00

23040.00

342.000
3.000
10.000

20.00
#REF!
10.00

6840.00
100.00
4197.20
PH data

Page 1812 of 3205

34177.20
935.59

PH data

Page 1813 of 3205

1.100
1.500
0.060

384.00
450.00
504.00

422.40
675.00
30.24

0.180

909.70

163.75

0.500

194.00

97.00
10.00
168.61
1373.00

0.289
0.167
0.180
0.500

PH data

Page 1814 of 3205

6.000
1%

6.000
1%

6.000
1%

6.000
1%

6.000
1%

6.000
1%

0.700
1%

PH data

Page 1815 of 3205

0.700
1%

0.710
1%

0.790
1%

0.714
1%

0.780
1%

1.197

23000.00

27531.00

0.095

23000.00

2185.00

PH data

Page 1816 of 3205

1.005

23000.00

23115.00

52831.00
10566.20

7.500
6.000

450.00
384.00

3375.00
2304.00
20.00
2277.13
18542.33
618.08

PH data

Page 1817 of 3205

1.204

23000.00

27692.00

0.313

23000.00

7199.00

0.680

23000.00

15640.00

50531.00
10106.20
1684.37
11790.57
1650.68
13441.25
516.18

618.08
516.18

1.000
2.750

450.00
384.00

450.00
1056.00
1506.00
210.84
1716.84
6.17
308.27

PH data

Page 1818 of 3205

0.150
0.350
0.600
2.000

576.00
450.00
450.00
384.00

86.40
157.50
270.00
768.00
179.47
1461.37

PH data

Page 1819 of 3205

DATA FOR STORM WATER DRAINS


Kandukur Municipality
DATA BASED ON - 2014 - 2015 SSR
20/02/16
1

BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lea
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of wo
dewatering charges etc as per SS - 20 B (APSS 308).

Ordinary Soil-Manual Means

out put

a)Labour
Mate
Mazdoor (Unskilled) (excluding LC )
Add Labour component @
Sub total
extra for foundations @
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
2

10.00

0 Nos.
3.64 Nos.
20%
75%
14%

BLD-CSTN-2-2(10) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial le
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of wo
dewatering charges etc as per SS - 20 B (APSS 308).

Ordinary soils-Mechcanical Means-Upto 3 m depth

out put

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

240

0 Nos.
8.32 Nos.
6 hours
Sub total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering
3

BLD-CSTN-2-4 (12) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial le
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of wo
dewatering charges etc as per SS - 20 B (APSS 308).

Ordinary rock (not requiring blasting)-Manual MeansUpto 3 m depth


a)Labour
Mate
Mazdoor (Unskilled) (excluding LC )
Add Labour component @
Sub total
extra for foundations @
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering

337269598.xlsx drains-data

out put

10.00
0 Nos.
5.20 Nos.
20%
75%
14%

Page 1820 of 3205


4

BLD-CSTN-2-5 - (13): Earth work excavation for foundations and depositing on bank for all lifts and with an initial le
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of wo
dewatering charges etc as per SS - 20 B (APSS 308).
Ordinary rock (not requiring blasting)-Mechanical MeansUpto 3 m depth
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering

out put
0 Nos.
6.24 Nos.
6 hours

BLD-CSTN-2-6 - (14): Earth work excavation for foundations and depositing on bank for all lifts and with an initial le
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of wo
dewatering charges etc as per SS - 20 B (APSS 308).
Hard rock (requiring blasting)-Upto 3 m depth
a)Labour
Mate
Driller
Blaster
Mazdoor (Unskilled)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers

out put

10

0 Nos.
0.50 Nos.
0.25 Nos.
8.35 Nos.
1 hours

c) Materials
Gelatine 80 per cent - M-104, Pg No.246
Electric Detonators @ 1 detonator for 2 gelatine sticks of 285 gm
each - M-094, Pg No.246
Sub total
d) Overheads & Contractors Profit
Total
Cost for 10 cum = a+b+c+d
Rate per 1 Cum excluding Dewatering
6

180

3.50 Kg
14 Nos.

BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing on bank for all lifts and with a
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished
excluding dewatering charges etc as per SS - 20 B (APSS 308).
Hard rock (blasting prohibited)-Upto 3 m depth
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers of
pneumatic breaker at 1 cum per hour
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d+e)/10
Rate per 1 Cum excluding Dewatering

337269598.xlsx drains-data

out put

10.00
0.00 Nos
5.20 Nos
6 hour

14%

Page 1821 of 3205


7

BLD-CSTN-2-8 (16) : Filling with sand in trenches, sides of foundations and basement with initial lead in la
consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site an
charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Sand Filling
a) Material
Sand

6.00
6.00 Cum

b)Labour
Mate
Mazdoor (Unskilled)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

14%

Rate per 1 Cum

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundation
layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS
out put

Earth filling (ordinary soil)

b)Labour
Mate
Mazdoor (Unskilled)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

6.00
0.00 Nos
0.31 Nos
14%

Rate per 1 Cum

RBR-FNDN-2: Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking
premeasurements
including cost and convenyance of all material and all labour charges etc. complete as p
305.3.9 MORD & 304 MORTH
a)Labour
Mate
Mazdoor (Unskilled)
b) Material
Stone dust
Sub total a+b
c&d) Overheads & Contractors Profit
Rate per cum = a+b+c+d //6cum

0.00 Nos
0.31 Nos
6.00 Cum

Rate per 6 Cum

Rate per 1 Cum


10

PCC NOMINAL MIX UP TO PLINTH LEVEL - MACHINE MIXING


BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level
Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm siz
Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seig
labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required leve
item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Water (including for curing)

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY
337269598.xlsx drains-data

Page 1822 of 3205


Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

1 hour

C. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 Nos
1.39 Nos

Grand Total

Overheads & Contractors Profit


Rate per cu.m.

337269598.xlsx drains-data

Page 1823 of 3205


11

BLD-CSTN -3-14-Using Concrete mixture up to Plinth Level


Laying VCC in M20 grade Design Mix for CC drains slab using OPC cement @ 350 Kg/Cum of Concrete; coars
IS:383 as per approved mix design, with coarse aggregates of 20mm graded Hard Granite Machine Crushed Meta
all materials like Cement, Sand, Coarse Aggregate, Water, machinery, vibrating charges, centring charges, all labo
curing (including provision and placing in position of expansion, contraction, construction and longitudinal joints and
filler and sealant), including all incidental and operational charges etc. complete for finsihed item of work confirming
& IRC & Morth.
Note : 1) The quantities for cement,course aggregate and fine aggregates for est
quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than
cost shall be deducted

Unit : 1cum
A. MATERIALS:
Cement
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Weigh Batcher Hire charges (Machine mixing) charges

350.00 Kg
0.80 Cum
0.40 Cum
1.20 Kl
1.333 Hr

Vibrator hire charges


C. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total
a

1.333 Hr
0.133 Nos
0.267 Nos
4.600 Nos

CC M-20 coping and bed


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component on Labour charges @

1.00
Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

Rate per One Cum


b

CC M-20 Drain walls up to 450mm height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component on Labour charges @

1.00
Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

Rate per One Cum


c

CC M-20 Drain walls above 450mm height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component on Labour charges @

1.00
Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

Rate per One Cum

337269598.xlsx drains-data

Page 1824 of 3205


12

BLD-CSTN-3-13-(30)-C: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIG
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conv
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other t
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,co
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code
by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete b
fabrication charges for finished item of work. for RCC SLABS, BEAMS

M-20 GRADE OF MIX


Cost of Cement
20mm HBG graded metal
Sand
1st Class Mason
2nd Class Mason
Mazdoor (Both Men & Women)
Weigh Batcher Hire charges
Vibrator hire charges
Water (including for curing)
BASIC COST per 1 cum
a

350.00
cum
0.90
cum
0.45
cum
0.067
day
0.133
day
2.500
day
0.267
h
0.267 hour
1.200
kl

RCC M 20 Slabs 150mm thick


Cost of M- 20 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
6.67 Sqmt.
6.67
Sqm
20%

Overheads & Contractors Profit


Total
Rate per One Cum
b

RCC M 20 Slabs 175mm thick


Cost of M- 20 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
5.71 Sqmt.
5.71
Sqm
20%

Overheads & Contractors Profit


Total
Rate per One Cum
c

RCC M 20 Slabs 225mm thick


Cost of M- 30 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
4.44 Sqmt.
4.44
Sqm
20%

Overheads & Contractors Profit


Total
Rate per One Cum
d

RCC M 20 Slabs 250mm thick


Cost of M- 30 grade mix
Centering charges ,Pg No.92
Labour charges,Pg No.92
Add Labour component @

1.00 Cum
4.00 Sqmt.
4.00
Sqm
20%

Overheads & Contractors Profit


Total
337269598.xlsx drains-data

Page 1825 of 3205


Rate per One Cum

337269598.xlsx drains-data

Page 1826 of 3205


13

BLD-CSTN-6-4; Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and co
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges et
ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
Seigniorage charges for F.A
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm

14

0.15 Cum
0.15 Cum
0.60 Nos
0.96 Nos

BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening
and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with bin
for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, includ
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, op
cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finishe
No.126
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire- SSR (Irrigation) item No 3, Pg 233
(b) Labour for cutting, bending, shifting to site, tying and
placing in position
Blacksmith / Bar bender
Mazdoor (Unskilled)
Sundries on Material
(c) Overheads on (a+b)
(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
Rate per One MT
Rate per One Kg

1.05

Ton

6.00 kg

10.00
10.00

No
No

15

Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cos
charges, all leads & lifts and other incidental and operational charges etc., complete.

Rock
Page No.328 of SSR, Conveyance rates - 5.00 Km
Add Sundries
Rate per 1 Cum
Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km

1 cu.m.

1 cu.m.

Add Sundries
Rate per 1 Cum
16

RBR-PTWK-5: Providing and laying pitching on slopes laid over prepared filter media as per drawing and tec
MORD / 2504 MORTH
Stone/Boulder
Unit = cum
(a) Material
Stone boulder (25 kg minimum) /(MORTH - 40 kg)
337269598.xlsx drains-data

1.0

Cum

Page 1827 of 3205


Stone spalls of minimum 25 mm size
(b) Labour
Mate
Mason 1st Class
Mazdoor (Unskilled)
c&d) Overheads & Contractors Profit
VAT, labour cess and variation of material cost during the
execution
etc,.
Rate per 1 Cum
17

0.2

Cum

0.4
0.8

day
day
day

14%
0%
0%

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundation
layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS
out put

Earth filling (ordinary soil)

b)Labour
Mate
Mazdoor (Unskilled)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
Rate per 1 Cum

337269598.xlsx drains-data

6.00
0.00 Nos
0.31 Nos
14%

Page 1828 of 3205

DRAINS
SSR

or all lifts and with an initial lead of 10m including all operational,
mplete for finished item of work including seigniorage excluding
Cum

320.00

1 Each
1 Each

Rs

0.00
1164.80
232.96
1397.76
873.60
2271.36
317.99
2589.35
258.94
258.94

for all lifts and with an initial lead of 10m including all operational,
mplete for finished item of work including seigniorage excluding
Cum
0.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2791.72
22732.60
94.72
94.72

Rs

for all lifts and with an initial lead of 10m including all operational,
mplete for finished item of work including seigniorage excluding

Cum

320.00

1 Each
1 Each

Rs

0.00
1664.00
332.80
1996.80
1248.00
3244.80
454.27
3699.07
369.91
369.91

337269598.xlsx drains-data

Page 1829 of 3205

for all lifts and with an initial lead of 10m including all operational,
mplete for finished item of work including seigniorage excluding

Cum
0.00
384.00

1 Each
1 Each

0.00
2396.16

2791.00

1 hours

16746.00
19142.16
2679.9
21822.06
121.23
121.23

Rs

for all lifts and with an initial lead of 10m including all operational,
mplete for finished item of work including seigniorage excluding
Cum
0.00
504.00
576.00
384.00

1 Each
1 Each
1 Each
1 Each

0.00
252.00
144.00
3206.40

1145.10

1 hours

1145.10

73.00
13.00

1 Kg
100 Nos.

255.50
1.82

Rs

5004.82
700.67
5705.49
570.55
570.55

n bank for all lifts and with an initial lead of 10m including all
ng, etc. complete for finished item of work including seigniorage
Cum
0.00
384.00

1 Nos
1 Nos

0.00
1996.80

1145.10

1 hour

6870.60

8867.40
1241.44
10108.84
1010.88
1010.88

337269598.xlsx drains-data

Page 1830 of 3205

asement with initial lead in layers not exceeding 15 cm thick,


eyance of water to work site and all operational, incidental, labour
09 & 310)
Cum
641.93

1 Cum

3851.58

0.00
384.00

1 Nos
1 Nos

0.00
119.04
3970.62
555.89
4526.51
754.42
754.42

n trenches, sides of foundations and basement with initial lead in


nd ramming including cost and conveyance of water to work site
or finished item of work. (APSS NO. 309 & 310)
Cum
0.00
384.00

1 Nos
1 Nos

0.00
119.04
16.67
135.71
22.62
22.62

rry to work site and stacking at work site to Dept. gauge for
ur charges etc. complete as per standard specifications. Clause

0.00
384.00

1 Nos
1 Nos

1001.81

1 Cum

0.00
119.04
6010.86
6129.90
858.19
6988.09
6988.09
1164.69

EL - MACHINE MIXING

e aggregate ) using 40mm size Hard Granite Machine Crushed


regate water etc., to site , seigniorage charges on all materials,
op surface to the required level curing etc., complete for finished

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
356.37
123.60

337269598.xlsx drains-data

Page 1831 of 3205


338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3487.46
488.24
3975.70
3975.70

Rs

Rs

337269598.xlsx drains-data

Page 1832 of 3205

50 Kg/Cum of Concrete; coarse and fine aggregate confirming to


Granite Machine Crushed Metal including cost and conveyance of
rges, centring charges, all labour charges, Seigniorage Charges,
ction and longitudinal joints and its filling but excluding cost of joint
nsihed item of work confirming to Standard specification SS 1515
and fine aggregates for estimating purpose only.The exact
tent is found to be less than 350 Kgs/ Cum the defference in

5.74
1854.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

2009.00
1483.85
316.77
123.60

338.60

1 Hr

451.35

175.40

1 Hr

233.81

504.00
450.00
384.00

1 Nos
1 Nos
1 Nos

6571.96
277.00
446.00

6571.96
277.00
446.00

6571.96
315.00
710.00

Rs

67.03
120.15
1766.40
6571.96

Rs

6571.96
277.00
446.00
89.20
7384.16
1033.78
8417.94
8417.94

Rs

6571.96
277.00
446.00
89.20
7384.16
1033.78
8417.94
8417.94

Rs

6571.96
315.00
710.00
142.00
7738.96
1083.45
8822.41
8822.41

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

337269598.xlsx drains-data

Page 1833 of 3205

sponding to IS 456 using WEIGH BATCHER / MIXER with 20mm


quarry including cost and conveyance of all materials like cement,
rage charges, sales & other taxes on all materials including all
, laying concrete, curing etc.,complete but excluding cost of steel
cement content as per IS code from standard suppliers approved
ating, curing etc. complete but excluding cost of steel and its

5.74
1854.81
791.93
504.00
450.00
384.00
338.60
175.40
103.00

1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 Cum
1 hour
1 Cum
Rs.

5349.16
152.00
121.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

5349.16
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

5349.16
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

5349.16
156.00
124.00

1 Cum
1 Sqmt.
1 Sqm
Rs

2009.00
1669.33
356.37
33.77
59.85
960.00
90.41
46.83
123.60
5349.16

5349.16
1013.33
806.67
161.33
7330.49
1026.27
8356.76
8356.76

5349.16
890.76
708.04
141.61
7089.57
992.54
8082.11
8082.11

5349.16
693.33
551.11
110.22
6703.82
938.53
7642.35
7642.35

5349.16
624.00
496.00
99.20
6568.36
919.57
7487.93
337269598.xlsx drains-data

Page 1834 of 3205


Rs

7487.93

337269598.xlsx drains-data

Page 1835 of 3205

smooth including cost and conveyance of all materials to site,


al, incidental, labour charges etc., including cutting grooves where
m.

3733.88
0.00

1 Cum
1 Cum

560.08
0.00

504.00
384.00

1 Nos
1 Nos

302.40
368.64
1231.12
172.36
1403.48
1403.48

Rs

chanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
bour charges for straightening, cutting, bending to required sizes
d tying and lap-splicing with binding wire of 18 SWG, forming grills
onveyance of steel bars, including all wastages such as overlaps,
er blocks and all incidental, operational, labour charges such as
terials etc., complete for finished item of work in all floors.( APSS

34000.00

1 Ton

35700.00

70.00

1 kg

420.00

588.00
384.00

1 No
1 No

5880.00
3840.00

1 MT
Sub Total:
Rs.

6417.60
52257.60
52257.60
52.26

oading, unloading charges, cost & conveyance, dumping, labour

82.70

1 Cum
Rs

82.70

1 Cum

82.70
0.00
82.70
82.70

Rs

0.00
82.70

media as per drawing and technical specifications Clause 1302

164.00

1 Cum

164
337269598.xlsx drains-data

Page 1836 of 3205


306.76

1 Cum

588.00
384.00

1 day
1 day
1 day

61.35

Rs

Rs

205.8
303.36
734.51
102.83
0.00
0.00
837.34

n trenches, sides of foundations and basement with initial lead in


nd ramming including cost and conveyance of water to work site
or finished item of work. (APSS NO. 309 & 310)
Cum
0.00
384.00

1 Nos
1 Nos

0.00
119.04
16.67
135.71
22.62
22.62

337269598.xlsx drains-data

Page 1837 of 3205

COST SCHEDULE E-2


11/0.4 KV OUT DOOR SUB-STATION (ON RSJ )
63 KVA Transformer
Sl. No.

Particulars

Unit

Rate (Rs.)
Qty.

100 KVA Trans

Amt. (Rs.)

Qty.

Transformer 11/0.4 KV (Conventional)


63 KVA

No.

68705.00

100 KVA

No.

87033.00

200 KVA

No.

146945.00

315 KVA

No.

296066.00

RS Joist 175x85, 19.6kg/mtr., 11mtr. Long

No.

10859.56

21719

D.C.cross-arm of 100 X50X 6 mm. 8' centre with 2 pair of clamp suitable for RSJ

Set

3593.00

3593

11 KV Disc Insulator (Polymer)

No.

178.00

534

11KV Strain hard ware fitting

No.

86.00

258

11 KV D.O. fuse & Lightening Arrestor mounting channel (75X 40 X 6 mm.) with 2
back clamp suitable for RSJ

Set

1463.00

2926

11 KV D.O. fuse unit

No.

1064.00

3192

11 KV Lightning arrestors

No.

515.00

1545

Transformer mounting DC cross-arm 100 X 50 X6 mm. channel

Set

3882.00

3882

10

Transformer clamping set 50X50 X6 mm Angle

Set

1925.00

1925

11

Transformer belting with 50 X 50 X 6 mm.angle with two cross fixing channels

Set

1925.00

1925

12

Stay set 16 mm. complete with back clamps, stay wire 7/3.15 mm. (5.5 kg.stay wire
per stay set ) and turn buckles

Set

875.03

3500

13

Concreting of RS Joist @ 0.5 cmt. per pole

Cmt. (1:3:6)

3100.00

1.0

3100

1.0

14

Concreting of Stay @ 0.2 cmt. per stay

Cmt. (1:3:6)

3100.00

0.8

2480

0.8

15

AAA Conductor Rabbit for Jumper

Mtr.

25.59

30

768

30

16

Danger Boards Enamalled Type 11KV

No.

75.00

75

17

Earthing set

Set

4012.00

4012

E-2 (RSJ)

68705
1

Page 1838 of 3205

18

Anti climbing devices (Barbed wire 2.24 mm Dia (14 SWG) (3.5 Kg. wire per pole)

No.

232.00

464

19

Red oxide paint

Ltr.

95.00

190

20

Aluminium paint

Ltr.

159.00

318

21

M.S.Nuts and Bolts

Kg.

69.00

14

966

14

22

Distribution Box mounting channel (75x40x6 mm.)

No.

2197.00

4394

23

L.T. Distribution box suitable for 63 KVA transformer (without TPN switches) with
MCCB on incoming and PF units on outgoing side

No.

13460.00

13460

24

L.T. Distribution box suitable for 100 KVA transformer (without TPN switches) with
MCCB on incoming and PF units on outgoing side

No.

15680.00

25

L.T. Distribution box suitable for 200 KVA transformer (without TPN switches) with
MCCB on incoming and PF units on outgoing side

No.

24070.00

26

L.T. Distribution box suitable for 315 KVA transformer (without TPN switches) with
MCCB on incoming and PF units on outgoing side

No.

29347.00

27

50 Sq.mm.,single core XLPE insulated un-armourered aluminium conductor cable

Mtr.

32.74

80

2619

28

70 Sq.mm.,single core XLPE insulated un-armoured aluminium conductor cable

Mtr.

43.44

40

1738

29

150 Sq.mm.,single core XLPE insulated un-armoured aluminium conductor cable

Mtr.

86.69

30

300 Sq.mm.,single core XLPE insulated un-armoured aluminium conductor cable

Mtr.

165.63

31

11 KV A.B. switch

Set

5909.00

32

Three phase meter 20-80 Amps.with L.S. & TOD Facility with box

No.

5294.00

33

LT CT operated 3 Phase 4 W Static energy meter with CT & Modem

No.

9435.00

34

HT tape for covering LT bushing including winding and blower heating

mtr

30.00

40

1
1

5294
1

30

Total
35

80

900

30

154482

Centages
(i) Stores Incidental Charges
(ii) Contingencies
(iii)W/c. establishments

2.5 %
5.0 %
2.5 %
E-2 (RSJ)

11.50%

17765

11.50%

11.50%

Page 1839 of 3205

36

(iv) T & P
Labour & Transportation charges @ 10% of material cost

37

Cost per sub-station

17765

1.5 %
15448
187695

Add 14% contractors profit

14%

Add VAT Etc

0%

Add 15% for change of SSR

10%

E-2 (RSJ)

25555.00
213250.00
0.00
213250.00
21325.00
234575.00

11.50%

Page 1840 of 3205

2012-13

KVA Transformer

200 KVA Transformer

Amt. (Rs.)

Qty.

Amt. (Rs.)

146945.00

315 KVA Transformer


Qty.

Amt. (Rs.)

87033
1

296066

21719

21719.12

21719

3593

3593.00

3593

534

534.00

534

258

258.00

258

2926

2926.00

2926

3192

3192.00

3192

1545

1545.00

1545

3882

3882.00

3882

1925

1925.00

1925

1925

1925.00

1925

3500

3500.12

3500

3100

1.0

3100.00

1.0

3100

2480

0.8

2480.00

0.8

2480

768

30

767.70

30

768

75

75.00

75

4012

4012.00

4012
E-2 (RSJ)

Page 1841 of 3205

464

464.00

464

190

190.00

190

318

318.00

318

966

14

966.00

14

966

24070.00

29347

4394

15680

3475
3468

80

6935.20

80

6935

40

6625.20

40

6625

5909

5909.00

5909

9435

9435.00

9435

900

30

900.00

30

900

187666

21582

258191.34

11.50%

29692.00

412589

11.50%

47448

E-2 (RSJ)

21582

11.50%

29692.00

11.50%

Page 1842 of 3205


47448

18767

25819.13

41259

228014

313702.48

501296

31044.00
259058.00
0.00
259058.00
25906.00
284964.00

42711.00
356413.00
0.00
356413.00
35641.00
392054.00

68251.00
569547.00
0.00
569547.00
56955.00
626502.00

E-2 (RSJ)

REC Construction Standard No. A-34/1993


Cost data per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 9.1 Mts.
PSCC Poles at 60 Mts. Span, 75 Kg/sq.Mt wind pressure, working load 140 Kgs.
Sl. No.

Particulars

Qty.

Rate in Rs.

9.1 M PSCC Pole

18

2585.00

1.07 M Channel / 'V' Cross Arm

18

396.00

Top Clamp with cleat

16

246.00

Back Clamp

17

93.00

Stay Set complete

10

729.00

Bracing Set with double cross arm

3584.00

55 Sq.mm AAA Conductor

23160.00

11 KV Pin Insulator with Pin

54

71.00

Strain Insulator with metal parts

12

249.00

10

Concreting of Pole, Stay sets & Base concreting

11

Misc. Items like coil earthing, pipe eathing, danger, bolts &
nuts, etc
Total Cost of Material
3% storage & handling charges on items (1) to (9)

3% Contingencies on Materials
Labour & Transport
10% Estt. & Genl. Charges on Materials
Total
Or Say
Add 14% contractors profit

14%

Add 15% for change of 4 SSRs

20%

Add VAT, LC. Etc

Total cost for 1 Km

0%

COST SCHEDULE - C-6


11 KV D.P.STRUCTURE ON PCC POLES
(TO BE SUPPLEMENTED TO EVERY 1.6 KMS.OF 11 K.V. LINE)
Sl.No.

Particulars

Unit

Rate (Rs.)

140 Kg., 8.0 Mtrs. long PCC poles


D.C.cross- arm of ISMC channel of 100 X 50, suitable for
4' centre DP with 2 pair of clamp sutiable for 140 kg. PCC
pole

No.

1460.00

Set

3234.00

11 KV Disc Insulator (Polymer)


11KV Strain hard ware fitting
11 KV Pin insulator (Polymer)
Horizontal and cross bracing 4' centre with set of four back
clamps
Stay set 16 mm. complete with back clamps, stay wire
7/3.15 mm. (5.5 kg.stay wire per stay set ) and turn buckles

No.
No.
No.

178.00
86.00
179.00

Set

2864.00

Set

875.03

2
3
4
5
7
8
9
10
11
12
13
14
15
16
17

18
19

Concreting of PCC pole @0.5 cmt per pole (Base pedding


Cmt. (1:3:6)
+ Muffing)
Concreting of stay @ 0.2 cmt. per stay
Cmt. (1:3:6)
Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 Mtrs.
No.
lead of 4.0 mm. G.I wire)
Red oxide paint
Aluminium paint
Anti climbing devices
Danger Boards Enamalled Type 11KV
M.S.Nuts and Bolts
Total
Centages :
(i) Stores incidental charges
(ii) Contingencies
(iii W/c. establishment
(iv) T & P
Labour & Transportation charges @ 25.72% of material
cost for PCC Pole support
Cost per D.P.
Add 14% contractors profit

Ltr.
Ltr.
No.
No.
Kg.

3100.00
3100.00
125.00
95.00
159.00
232.00
75.00
69.00

2.5 %
5.0 %
2.5 %
1.5 %

14%

Add VAT Etc

0%

Add % for change of SSR

5%

DATA FOR PROVIDING 1 NO. HT SERVICE LINE FOR A


CMD OF 100 KV LINE AND CONNECTED LOAD 108 HP + 5 KW ETC.

1 Supply, delivery of REC constructor standard No: A 5/ 1972 including 11 KV Line with 55 Sqm. AAA conducto
9.10 Mtrs long 140 Kgs working load at 60 Mts span and 75 Kg/Sqmm wind pressure with required stay set whe
the rates including cost of materials and conveyance to work site and labour charges for erection of HT line etc. c
VAT 12.50%).

Errection of 11 KV lines with 55 Sqmm AAA Conductor over


9.10 Mts PSCC poles at a span of 60 Mts etc.
Labour and Transport
Storage and handling charges
Add 12.50% VAT
Total Rs

2 Errection of line 11 KV AB Switch


Labour and Transport
Storage and handling charges
Add 14% contractors profit

14%

Add VAT Etc

0%

Add % for change of SSR

5%
Total Rs

93

uctor over 9.1 Mts.

orking load 140 Kgs.


Per Unit

Amount in Rs.

Each

46530.00

Each

7128.00

Each

3936.00

Each

1581.00

Each

7290.00

Set

3584.00

K.M.

70869.60

Each

3834.00

Each

2988.00

L.S

45782.00

L.S

3960.00
197483.00
4432.00

5924.00
51820.00
19748.00
279407.00
279407.00
38041.00
317448.00
63490.00
380938.00
0.00
380938.00
380938.00

1 K.V. LINE)
PCC pole
Qty.
2

Amt. (Rs.)
2920.00

3234.00

6
6
2

1068.00
516.00
358.00

2864.00

5250.18

3100.00

1.2

3720.00

125.00

0.6
0.6
2
1
6

11.5 %

57.00
95.40
464.00
75.00
414.00
24,260.58

2,790

6,240
27,050.55
3683.00
30734.00
0.00
30734.00
1537.00
32271.00

NE FOR A
HP + 5 KW ETC.

with 55 Sqm. AAA conductor on PSCC poles of


e with required stay set wherever necessary etc,
for erection of HT line etc. complete (inclusive of

Rs

182300.00

Rs

26060.00

Rs

3085.00
211445.00
26430.625
237880.00

Rs

28700.00

Rs

1435.00

Rs

430.00
30570.00
4162.00
34732.00
0.00
34732.00
1737.00
36469.00

NALGONDA UNDER GROUND DRAINAGE WORK UNDER UIDSSMT.


Revised Estimate
S.No

3
4
5
6
7
8
9
10

11
12

NALGONDA UNDER GROUND DRAINAGE WORK UNDER UIDSSMT.


Revised Estimate
NALGONDA WATER SUPPLY IMPROVEMENT SCHEME.

Construction of 17.16 MLD Sewage Treatment Plant, 17.16Mld Intake well, Grit chamber, Trunk mains,
Gravity main, compound wall, divertion canal, Pump sets, Gen. sets,Ttransformers, maintanance of
greenery around the STP, providing solar lighting and dedicated power supply etc
for Zone 1, 2 & 4
including auxiliary works of STP-I and auxiliary works of STP-II
Construction of 2.55 MLD Sewage Treatment Plant with Moving Media Bio Reactor (MMBR) technology
including Intake well, Pump sets, Gen sets and dedicated Power supply for Zone - 3
Sub Total:
Provision for Railway Crossing including amount payble to Railways department.
Provision for Road Cutting charges payble to R & B Department.
Provision for Road Cutting charges payble towards State Highway Cutting
Provision for Land Acquisition
Provision for Price esclalation @ 5%
Provision for PS & Contingencies @ 3%
Provision for procurement of Jetting & Suction Machinary
Provision for Taxes @ 4.12%
Provision for Consultancy services for Third Party Quality Control and Project Monitoring Consultancy
Provision for Consultancy services for preparation of estimations and ground validated drawings etc.
U/f items of works
Sub Total:
Grand Total

IDSSMT.

Total Rs. In Lakhs

#REF!

#REF!

#REF!
#REF!

#REF!
#REF!
90.00
#REF!
43.45

43.45
52.91
#REF!
#REF!

Page 1852 of 3205

Kandukur Municipality
DATA - ALL PIPE LINE WORKS RELATED TO WATER SUPPLY AND SEWERS
Data Based on 2015-16 SSR

20/02/16
I
COMMON DATA
Sn.
Description
Quantity
1 Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including water bound macadam
materials for pipe line trench work. as directed by the departmental officers.
Rate as per PH SSR item no 25a, Pg.6
1 Sqm
Add for Municipal Allowance at
20%
Overheads & Contractors Profit
14%
Total
VAT & Labour cess.
0%
Rate per 1 Sqm
2

Cutting open C.C. road surface including stacking of excavated materials for pipe line trench work. as directed by the
Rate as per PH SSR item no 25b,Pg.6
Add for Municipal Allowance at

1 Cum
20%
14%

Overheads & Contractors Profit

Total
VAT & Labour cess.

0%
Rate per 1 Cum

Cutting open water bound macadam road including soiling and stacking of excavated materials for pipe line tre
departmental officers.
Rate as per PH SSR item no 25 c,Pg.6
Add for Municipal Allowance at
Overheads & Contractors Profit
Total
VAT & Labour cess.

1 Cum
20%
14%
0%
Rate per 1 Cum

RBR-FNDN-1- ( I-A-i ) In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavati
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing
deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and a
officer including protecting the existing utility services wherever it is possible during the execution and taking all
restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with ex
disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for P
means.

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
3.64 Nos.
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches @
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
337269598.xlsx - data-WS & Sewer (2)

14%
75%

0%
5%

Page 1853 of 3205

Rate per 1 Cum including Dewatering

337269598.xlsx - data-WS & Sewer (2)

Page 1854 of 3205

a
b
6

RBR-FNDN-1- (I-B-i) - In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork exc
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and b
other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as direc
including protecting the existing utility services wherever it is possible during the execution and taking all precautio
areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suita
remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines b

In ordinary soils by Mechanical means for Pipe line trenches


up to 3.00 Mts depth below GL
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

240.0
0 Nos.
8.32 Nos.
6.00 hours
14%

0%
5%

RBR-FNDN-1- ( I-A-ii ) In ordinary soils, 3.00 Mts to 6.00Mts. depth below GL by Manual means: Earthwork exc
Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and b
other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 Mo
departmental officer including protecting the existing utility services wherever it is possible during the executio
measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in tre
material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges
trenches by manual means.
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
3.00 Mts to 6.00 Mts. depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
4.68 Nos.
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches @
Cost for 240 cum = a+b+c+d

14%
75%

Rate per cum = (a+b+c+d)/10

VAT & Labour cess.

0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

337269598.xlsx - data-WS & Sewer (2)

5%

Page 1855 of 3205

RBR-FNDN-1- (I-B-ii) - In ordinary soils from 3.00 Mts to 6.00Mts depth below GL by Mechanical means:
kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction o
of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MO
departmental officer including protecting the existing utility services wherever it is possible during the executio
measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in tre
material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc
mechanical means.

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL

out put

210.0

a)Labour

a
b
8

Mate ( Labour- R&B-S.N.71)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

0 Nos.
8.32 Nos.
6.00 hours
14%

0%
5%

RBR-FNDN-1- ( I-A-iii ) In ordinary soils, above 6.00Mts. depth below GL by Manual means: Earthwork excavat
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing
deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and a
officer including protecting the existing utility services wherever it is possible during the execution and taking all
restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with ex
disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for P
means.
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
In ordinary soils, by Manual means for Pipe line Trenches
Above 6.00 Mts. depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
6.24 Nos.
c&d) Overheads & Contractors Profit @
add extra for pipe line trenches @
Cost for 240 cum = a+b+c+d

14%
75%

Rate per cum = (a+b+c+d)/10

VAT & Labour cess.


a
b

0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

337269598.xlsx - data-WS & Sewer (2)

5%

Page 1856 of 3205

a
b
10

RBR-FNDN-1- (I-B-iii) - In ordinary soils above 6.00Mts depth below GL by Mechanical means: Earthwork e
for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and b
other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as direc
including protecting the existing utility services wherever it is possible during the execution and taking all precautio
areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suita
remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines b

In ordinary soils by Mechanical means for Pipe line trenches


from 3.00 Mts to 6.00Mts depth below GL
out put
180.0
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
10.40 Nos.
b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)
6.00 hours
Sub total
c&d) Overheads & Contractors Profit
14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering

RBR-FNDN-1- ( II-A ) Ordinary rock (not requiring blasting) - up to 3.00 Mts. below GL by Manual means: Exca
line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing
deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and a
officer including protecting the existing utility services wherever it is possible during the execution and taking all
restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50
operational charges etc., complete for Pipe Line trenches by manual means.

Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth


out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

10

0 day.
5.20 day.
Sub total

c&d) Overheads & Contractors Profit


Cost for 180 cum = a+b+c+d
Rate per cum = (a+b+c+d)/180
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
11

14%

0%

RBR-FNDN-1- (II-B) - Ordinary rock (not requiring blasting) -up to 3.00Mts. below GL by Machanical means
for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and b
other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 Mo
departmental officer including protecting the existing utility services wherever it is possible during the executio
measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and disposal of rock
all incidental and operational charges etc., complete for Pipe Line trenches by machanical means.

Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m depth


up to 3.00 Mts depth below GL
out put

180.0

a)Labour

0 Nos.

Mate ( Labour- R&B-S.N.71)


337269598.xlsx - data-WS & Sewer (2)

Page 1857 of 3205

6.24 Nos.

Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery

Hydraulic Excavator - (Hire charges R & B- S.N.4)

6.00 hours

Sub total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
12

14%

0%

RBR-FNDN-1- (III) - Hard rock (require blasting) -up to 3.00Mts. below GL: Excavation in Hard rock for Pipe line
technical specifications including setting out, construction of shoring and bracing, removal of stumps and other de
sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental o
existing utility services wherever it is possible during the execution and taking all precautionary measures in th
sewer/water pipe lines including divertion of traffic and disposal of rock upto a lead of 50 m, including all incidenta
complete for Pipe Line trenches .

Upto 3 m depth including 1.5 m depth in hard rock


up to 3.00 Mts depth below GL
a)Labour
Mate ( Labour- R&B-S.N.71)
Driller ( Labour - R&B- Sn.31)
Blaster ( Labour-Irrigation-Skilled-Sn.3)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery

out put

0.50 Nos.
0.25 Nos.
8.35 Nos.
1.00 hours

Air compressor 210 cfm / 250 cfm with 2 jack hammers for drilling at 15 cum
per hour (Hire-Irri-Sn.3)

c) Materials
Gelatin 80%, (Pg 30 of Irrigation items - M - 104 )
Detonator electric, (Pg 29 of Irrigation SoR - M - 094)

3.50 No
14.00 Nos

Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
13

10.0

14%

0%

RBR-FNDN-1- (IV) - Hard rock (blasting prohibited) -up to 3.00Mts. below GL: Excavation in Hard Rock in hab
blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting ou
bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specifica
and as directed by the departmental officer including protecting the existing utility services wherever it is possible d
all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and
50 m, including all incidental and operational charges etc., complete

out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers ( Hire
charges- Irrigation-S.N.3)
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d+e)/10
337269598.xlsx - data-WS & Sewer (2)

10.00
0.00 Nos
5.20 Nos
6.00 hour

14%

Page 1858 of 3205

VAT & Labour cess.


Rate per 1 Cum excluding Dewatering

337269598.xlsx - data-WS & Sewer (2)

0%

Page 1859 of 3205

14

RBR-EECD-9 -ii-B : :Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, loadi
initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requiremen
sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH , by Machanical means for Sumps, T
etc,.
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Driller ( Labour- Irri-Skilled -S.N.9)
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker attachment @ 6 cum
per hour
Tipper 5.5 cum-1 trip per hour ( R&B-Hire-Sn.6)
Credit for excavated rock found suitable for use @ 50 per cent of
excavated quantity -M-089-Pg.29 - Irri SSR
Total
d) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e)/36
VAT & labour cess
Rate per 1 Cum excluding Dewatering

15

a
b
16

36.00

0.000 day
10.400 day
6.000 hour
6.50 hour
-18.00 cum

14%

0%

RBR-FNDN-1-A-i -manual means : Earthwork excavation for structures in all types of soils up to 3.00 Mts
means as per drawing and technical specifications including setting out, construction of shoring and bracing,
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with
per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. b

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
3.64 Nos.
Sub total
c&d) Overheads & Contractors Profit
14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
0%
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
5%
Rate per 1 Cum including Dewatering

RBR-FNDN-1-A-ii -manual means : Earthwork excavation for structures in all types of soils from 3.00 Mts to
manual means as per drawing and technical specifications including setting out, construction of shoring and bracin
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with
per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. b

Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
from 3.00 Mts to 6.00Mts. depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
4.68 Nos.
Sub total
c&d) Overheads & Contractors Profit
14%
337269598.xlsx - data-WS & Sewer (2)

Page 1860 of 3205

a
b

Cost for 240 cum = a+b+c+d


Rate per cum = (a+b+c+d)/10
VAT & Labour cess.
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

337269598.xlsx - data-WS & Sewer (2)

0%
5%

Page 1861 of 3205

17

RBR-FNDN-1-(i-B-i) : Earthwork in excavation for structures as per drawing and technical specifications Claus
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304
Machanical means
out put

Ordinary soils-Mechcanical Means-Upto 3 m depth

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity ( shovel- 0.85)

b
18

240

0 Nos.
8.32 Nos.
6 hours

Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

14%

0%
5%

RBR-FNDN-1-(i-B-ii) : Earthwork in excavation for structures as per drawing and technical specifications Claus
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 M
out put

Ordinary Soils-Mechcanical Means-3 m to 6 m depth

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

210

0 Nos.
8.32 Nos.
6 hours
Sub total

b
19

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

14%

0%
5%

RBR-FNDN-1-(i-B-iii) : Earthwork in excavation for structures as per drawing and technical specifications Claus
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead o
bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 M
out put

Ordinary Soils-Mechcanical Means-above 6 m depth

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

0 Nos.
8.32 Nos.
6 hours
Sub total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
Add extra for Dewatering @ 5%
Rate per 1 Cum including Dewatering

337269598.xlsx - data-WS & Sewer (2)

14%

0%
5%

180

Page 1862 of 3205

20

PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe lines including cost an
labour charges and removal of shoring and shuttering at appropriate places as directed by the departmental
ooperational charges etc, complete.

Single staging from 0 to 8-0 ( 0 to 2.5 Metre)


Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M deep.
Area = 30 x 1.5 = 45 sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi skilled-S.N.17)

0.570 day

Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Material
Polling boards and ballies
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 x 0.038) -(Pg.310
of Irri.SSR-Sn.-47-Pg.13 Jungle wood planks)

1.100 day

Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 4 x 1.5

0.160 cum

sqm
0.110 cum

BMC-X.05- Pg.No.104 of Bld.SSR-Casuarina Balli Props - 3" to 4" dia


- 12'-0" Height( Approx 9 Nos of Ballies equals to 0.16Cum, cost of
each balli =Rs. 68 (9x68 =612 )or 3825 for 1 Cum
DeductCredit for materials after use @ 80% of the cost of materials
=0.8 x X
c) Machinery
Total
Overheads & Contractors Profit
(d) Cost for 45 sqm (a+b+c)
Rate per each sqm = d/45
VAT & Labour cess.
Rate per 1 Sqm
b

14%

0%

Double staging from 8 to 14 ( 2.5 to 4.5 Metre)


Depth not exceeding 1.5 M
Details of cost for an area 30 M long and 1.5 M deep.
Area = 30 x 1.5 = 45 Sqm
(a) Labour
Carpenter 2nd class ( Labour-Irrigation-Semi skilled-S.N.17)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Material
Polling boards and ballies
Requirement for 45 sqm :
Polling Boards of 250 mm x 35 mm (40 x 1.5 x 0.25 x 0.038 = 0.57
cum)
Ballies 125 mm dia 1.5 mts long (60 x p x (0.125)2 / 4 x 1.5 = 1.1
cum
BMC-X.05- Pg.No.104 of Bld.SSR-Casuarina Balli Props - 3" to 4" dia

0.500 day
1.320 day
sqm
0.110 cum
0.220 cum

- 12'-0" Height( Approx 9 Nos of Ballies equals to 0.16Cum, cost of


each balli =Rs. 68 (9x68 =612 )or 3825 for 1 Cum
DeductCredit for materials after use @ 80% of the cost of materials
=0.8 x X
c) Machinery
Total
Overheads & Contractors Profit
337269598.xlsx - data-WS & Sewer (2)

14%

Page 1863 of 3205

(d) Cost for 45 sqm (a+b+c)


Rate per each sqm = d/45
VAT & Labour cess.
c

0%
Rate per 1 Sqm
Triple staging beyond 14 for every 2 meter (beyond 4.5 M) Add for every 2 Mts (difference of single and double s
mts.
Rate for 6.50m
Rate for 8.50m
Rate for 10.50m

337269598.xlsx - data-WS & Sewer (2)

Page 1864 of 3205

21

PHE-BHLW-26 : Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches
below G.L
Taking output 3 Rmt
Material
Bamboos of 1 dia 2.5 M long (5 ft c/c = 3 x 2.5) - BMC-X.12
-Sl.No.1024, Pg.104 of Bld.SSR
Bamboos of 1 dia 3.66 M long (5 ft c/c = 3x 3.66) - BMC-X.12
-Sl.No.1024, Pg.104 of Bld.SSR
Cost of Bamboos

7.50 rmt
10.98 rmt

(a) Usage of Material 5 times. Thus Cost of Material taken as 20%


(b) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
(c) Sundries for Coir rope, nails, @ 1%
(d) Sundries for lighting and watching etc at 1%

0.500 day

Overheads & Contractors Profit


Cost for 3rmt (a+b+c+d)
Rate per each rmt = (a+b+c+d)/3
VAT & Labour cess.
Rate per 1 Rmt
22

14%

0%

BLD-CSTN-2-8 (16) : Collection ,Supply and filling of Sand from approved quarry to work site and stacking at
premeasurements
including cost and convenyance of all material and all labour charges etc. complete as per s
305.3.9 MORD & 304 MORTH
out put

Sand Filling
a) Material

6.00

Sand (C-Mat-Lead statement-S.No.1)

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & Labour cess.

14%

0%

Rate per 1 Cum

23

BLD-CSTN-2-8 (16): Collection ,Supply and filling of Stone dust from approved quarry to work site and stacking a
premeasurements
including cost and convenyance of all material and all labour charges etc. complete as per s
305.3.9 MORD & 304 MORTH
out put

Stone dust Filling

6.00

a) Material
Stone dust Filling (C-Mat-Lead statement-S.No.23)

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & Labour cess.
Rate per 1 Cum

337269598.xlsx - data-WS & Sewer (2)

14%

0%

Page 1865 of 3205

24

BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in laye
consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site
labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

6.00

Cost of Gravel ( C-Mat - Sn.5)

6.00 Cum

a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess

14%

0%
Rate per 1 Cum

25

BLD-CSTN-2-9 (17); Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations a
layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and co
and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS N
out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess

6.00
0.00 Nos
0.31 Nos
14%

0%
Rate per 1 Cum

26

Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
charges, all leads & lifts and other incidental and operational charges etc., complete.

Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km
VAT & Labour cess.

1 cum
0%
Rate per 1 Cum

Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km
VAT & Labour cess.

1 cum
0%
Rate per 1 Cum

27

Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges an
etc, complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH items)
Total
Overheads & Contractors Profit

1 Hp.hr

14%

VAT & Labour cess.

0%
Rate per 1HPhr

337269598.xlsx - data-WS & Sewer (2)

Page 1866 of 3205

28

RBR-STCL-7 : Dismantling Stone Masonry as per Technical Specification Clause 202 : Dismantling of existing st
retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and st
with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH - Rubble Stone Masonry
Rubble Stone Masonry in Cement Mortar
a) labour
Mate
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley 3t
Total

Unit

1.25

0.000 day
0.780 day
0.270 hour
14%

C.Overheads & Contractors Profit


Total for 1.25 Cum
Total for 1 Cum

VAT & Labour cess.

0%
Rate per 1 Cum

29

RBR-STCL-5 : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising
wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposa
stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD /

Lime Concrete & CC upto M10 (Manual means)


a) labour
Mate

Unit

Mazdoor (unskilled)

0.000 day
1.040 day

b) Machinery
Tractor with trolley 3t

0.270 hour

Total
C.Overheads & Contractors Profit
Total for 1.25 Cum
Total for 1 Cum

1.25

14%

VAT & Labour cess.

0%
Rate per 1 Cum

Cement Concrete M15 & M20 (Manual means)


a) labour
Mate

Unit

Mazdoor (unskilled)

0.000 day
1.300 day

b) Machinery
Tractor with trolley 3t

0.270 hour

Total
C.Overheads & Contractors Profit
Total for 1.25 Cum
Total for 1 Cum

1.25

14%

VAT & Labour cess.

0%
Rate per 1 Cum

Reinforced Cement Concrete and prestressed Concrete (Manual


means)
a) labour
Mate
Black smith

Unit

Mazdoor (unskilled)

0.000 day
0.400 day
3.500 day

b) Machinery
Tractor with trolley 3t

0.270 hour

Cost per cu m
C.Overheads & Contractors Profit
337269598.xlsx - data-WS & Sewer (2)

14%

1.25

Page 1867 of 3205

Total for 1.25 Cum


Total for 1 Cum

VAT & Labour cess.

0%
Rate per 1 Cum

337269598.xlsx - data-WS & Sewer (2)

Page 1868 of 3205

30

PHE-URCI-19 : Uprooting of C.I. pipes by melting lead, loosening the joints, separating the pipes, hoisting and kee
but excluding earth work excavation and refilling
Details of cost for 40.26 m
80mm dia metre
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
b) Material

0.500 day
4.000 day

For breacking lead coulked joints, melting lead etc.,

Fuel wood (local market rate)


Kerosene oil (local market rate)
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

0.373 Qtl
0.379 litre
14%

0%
Rate per 1 Rmt

100mm dia metre


(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate)
Kerosene oil (local market rate)
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

0.630 day
4.500 day

0.466 Qtl
0.379 litre
14%

0%
Rate per 1 Rmt

150mm dia metre


(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood (local market rate)
Kerosene oil (local market rate)
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

0.830 day
5.500 day

0.663 Qtl
0.568 litre
14%

0%
Rate per 1 Rmt

200mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
337269598.xlsx - data-WS & Sewer (2)

1.100 day
6.500 day

Page 1869 of 3205

Fuel wood (local market rate)


Kerosene oil (local market rate)
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

0.840 Qtl
0.757 litre
14%

0%
Rate per 1 Rmt

250mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

1.300 day
7.500 day

1.026 Qtl
1.137 litre
14%

0%
Rate per 1 Rmt

300mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.

1.500 day
8.500 day

1.120 Qtl
1.515 litre
14%

0%
Rate per 1 Rmt

350mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.
337269598.xlsx - data-WS & Sewer (2)

1.750 day
9.500 day

1.231 Qtl
1.515 litre
14%

0%

Page 1870 of 3205

Rate per 1 Rmt


h

400mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

2.000 day
10.500 day

1.306 Qtl
1.894 litre
14%

0%

Page 1871 of 3205

450mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.
Rate per 1 Rmt
500mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.
Rate per 1 Rmt

31

600mm dia
(a) Labour
Assistant fitter (labour-Irri-Semi skilled.S.N.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
For breacking lead coulked joints, melting lead etc.,
Fuel wood
Kerosene oil
(c) Total = a+b
(d) Overheads & Contractors Profit
(e) Cost for 40.26 m (c+d)
Rate per each m = e/40.26
VAT & Labour cess.
Rate per 1 Rmt

2.250 day
11.500 day

1.400 Qtl
2.273 litre
14%

0%

2.500 day
12.500 day

1.492 Qtl
2.652 litre
14%

0%

3.000 day
14.500 day

1.580 Qtl
3.410 litre
14%

0%

PHE-URRC-20: Uprooting of R.C.C. Pipes including breaking the collars, loosing the joint, scraping the pipe, hoistin
10 M but excluding earthwork excavation and refilling
Taking output 10.00 Rmt
100mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9)
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

337269598.xlsx - data-WS & Sewer (2)

0.100 day
0.400 day
0.450 day

Page 1872 of 3205

(b) Overheads & Contractors Profit


(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1873 of 3205

150mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9)
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.100 day
0.490 day
0.560 day

(b) Overheads & Contractors Profit


(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

225mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9)
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.100 day
0.490 day
0.670 day

(b) Overheads & Contractors Profit


(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

300mm dia
(a) Labour
Fitter 2nd class (labour-Irri-Semi skilled.S.N.9)
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.100 day
0.490 day
0.790 day

(b) Overheads & Contractors Profit


(c) Cost for 10 Rmt (a+b)
Rate per each Rmt = c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

32

PHE-URSW-21: Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of useful mate
lead and disposal of un serviceable materials in to municipal dumps excluding the cost of earth work excavation. (R
No.)
Details of cost for 10 m
100mm dia metre
(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.490 day
0.360 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

150mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

337269598.xlsx - data-WS & Sewer (2)

0.490 day
0.450 day

Page 1874 of 3205

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1875 of 3205

200mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.490 day
0.510 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

250mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.490 day
0.570 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

300mm dia metre


(a) Labour
Man mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Women mazdoor ( Labour-Irrigation-Unskilled-S.N.4)

0.490 day
0.630 day

(b) Overheads & Contractors Profit


(c) Cost for 10 m (a+b)
Rate per each m =c/10
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

33

Providing temparary water supply house service connections with ISI mark GI pipes and fittings so as not to dis
connections during earth work excavation for trenches and during laying of new mains in including cost and conv
charges and with all incidental and operational charges etc., complete.

15mm Nominal bore GI pipe water supply line


S & F 15 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.67,Sn.278)
-2013-14 SSR
Add Municipal Allowence labour charges( as per -BMW-F.68 Sn.269) -2013-14 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2013-14 SSR item
ELEC-1.2.23, Sn.74

1 Rmt

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

20mm Nominal bore GI pipe water supply line


S & F 20 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.69,Sn.280)
-2013-14 SSR

337269598.xlsx - data-WS & Sewer (2)

1 Rmt

Page 1876 of 3205

Add Municipal Allowence labour charges( as per -BMW-F.70 Sn.281) -2013-14 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2013-14 SSR item
ELEC-1.2.23, Sn.74

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1877 of 3205

25mm Nominal bore GI pipe water supply line


S & F 25 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.71,Sn.282)
-2013-14 SSR
Add Municipal Allowence labour charges( as per -BMW-F.72 Sn.283) -2013-14 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2013-14 SSR item
ELEC-1.2.23, Sn.74

1 Rmt

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

a) S& F 32 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings includi
& labour charges complete
32mm Nominal bore GI pipe water supply line
S & F 32 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.73,Sn.284)
2013-14 SSR
Add Municipal Allowence labour charges( as per -BMW-F.74 Sn.284) -2013-14 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2013-14 SSR item
ELEC-1.2.23, Sn.74

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.


Rate per 1 Rmt
e

1 Rmt

0%

a) S& F 40 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings includi
& labour charges complete
40mm Nominal bore GI pipe water supply line
S & F 40 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.75,Sn.286)
2013-14 SSR
Add Municipal Allowence labour charges( as per -BMW-F.76 Sn.287) -2013-14 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2013-14 SSR item
ELEC-1.2.23, Sn.74

1 Rmt

20%
1 Rmt

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

a) S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings includi
& labour charges complete
50mm Nominal bore GI pipe water supply line
S & F 50 mm Nominal Bore GI pipe Medium Grade properties &
weight as per IS 1239 ISI mark with GI fittings (BMW-F.77,Sn.288)
2013-14 SSR
Add Municipal Allowence labour charges( as per -BMW-F.78 Sn.289) -2013-14 SSR
Supply of 19/20mm PVC Flexible Pipe. as per 2013-14 SSR item
ELEC-1.2.23, Sn.74

337269598.xlsx - data-WS & Sewer (2)

1 Rmt

20%
1 Rmt

Page 1878 of 3205

14%

c&d) Overheads & Contractors Profit


Total

VAT & Labour cess.

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1879 of 3205

34

Providing temporary U PVC rider mains for sewage connections so as not to distrub the existing sewerage c
excavation for trenches and during laying of new mains including cost and conveyance of all materials, labour char
operational charges etc., complete.
110mm dia U PVC 4 kg/SqCm
110mm dia PVC pipe as per data sheet
Lowering charges
Earth work Excavation charges -1x0.6*0.6 = 0.36 cum

1 Rmt
1 Rmt
0.36 Cum

VAT & Labour cess.

0%
Rate per 1 Rmt including 14% CP

35

CEMENT CONCRETE WORK


BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyan
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , layin
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and un
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1


Coarse aggregate 40mm graded ( C-Mat- S.No-57)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)


C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

1 hour
0.10 Nos
1.39 Nos

Sub- Total

d) Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum
36

0%

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal m
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyan
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , layin
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and un

Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
Coarse aggregate 40mm graded ( C-Mat- S.No-57)
Fine aggregate (Sand) ( C-Mat-S.N.2 )
Water (including for curing) -M-189-b. irrigation SSR

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)

1 hour

C. LABOUR:

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.10 Nos
1.39 Nos

Grand Total

Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & Labour cess.

0%
337269598.xlsx - data-WS & Sewer (2)

Page 1880 of 3205

Rate per 1 Cum

337269598.xlsx - data-WS & Sewer (2)

Page 1881 of 3205

37

BLD-CSTN-3-10- ( 27 ) Hand mixing : Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: c
size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finish
level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

220.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

Water (including for curing) -M-189-b. irrigation SSR

Coarse aggregate 20mm graded (C-Mat-Sn.49)


Fine aggregate (Sand)
Water (including for curing)
B. LABOUR:

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & Labour cess.


Rate per 1 Cum
38

0%

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Ce
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of a
coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, conc
finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
PCC -M-20
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

20mm HBG graded metal- ( as per Lead S.No-49)


Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)
VAT & Labour cess.

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
0.10 Nos.
1.39 Nos.
1.00 hour
0%

BASIC COST per 1 cum


a

Pedastals / Thrust blocks/ Anchor blocks


P.C.C. - M-20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & Labour cess.


Rate per One Cum
b

0%

CC (1:2:4) walls of any thick ness


P.C.C. - M-20 Per Cum
Centering charges rate s per Sl. No. Q of page No. 106 to 108

1.00 Cum
1.00 Cum

Labour rate s per Sl. No. Q of page. 106 to 108


Add Labour component @

1.00 Cum
20%

Overheads & Contractors Profit

14%

337269598.xlsx - data-WS & Sewer (2)

Page 1882 of 3205

Total
VAT & Labour cess.
Rate per One Cum

0%

337269598.xlsx - data-WS & Sewer (2)

Page 1883 of 3205

P.C.C. - M-20 for 0.910 Mts at bottom,0.53 at top, 100mm thick


ring of 1.00 m height with nomonal reinforcement
Qty of Ring = x(((0.552 -0.452)+(0.382-0.282))/2 x 1
Basic Rate per Cum.
Centering Charges for Pavement (SSR 306/L.8/2008-09 )
add steel @ 50 Kg/ Cum (cost excluding 14% CP)
Total
Overheads & Contractors Profit
VAT & Labour cess.
Rate per each ring

0.33 Cum
0.33 Cum
16.50 Kg
14%
0%

Supply & fixing CC (1:2:4) cover 1.00m x 0.45 m in panels with


nominal reinforcement 100mm thick and hooks for lifting
Basic Rate of CC (1:2:4) -1.0x0.45 x0.075
Add Centering charges
add steel @ 75 Kg/ Cum

0.034 Cum
0.034 Cum
2.53 Kg
Total

Overheads & Contractors Profit


Rate per each slab of 1.00m x 0.45m- 0.1m thick
39

14%

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-30 (Ce
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of a
coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, conc
finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement f

PCC -M-30
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)
Overheads & Contractors Profit

400.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
0.10 Nos.
1.39 Nos.
1.00 hour
14%

VAT & Labour cess.

0%
BASIC COST per 1 cum

40

BLD-CSTN-3-12-(29) Using Concrete mixture : Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement : fine
using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materi
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concre
finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
B. LABOUR:

337269598.xlsx - data-WS & Sewer (2)

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

Page 1884 of 3205

0.10 day
1.39 day

Mason 1st class (labour-Irrigation.S.N.11)


Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

Sub - Total
c.Overheads & Contractors Profit
Grand Total
VAT & Labour cess.
Rate per 1 Rmt
41

14%
0%

BLD-CSTN-3-13-(30)-C ; RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Tab
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyan
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxe
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but e
fabrication charges for finished item of work, but excluding centering, shuttering . for RCC SLABS, BEAMS
RCC SLABS, BEAMS -WOODEN SCAFFOLDING
A. MATERIALS:
20mm HBG graded metal- ( as per Lead S.No-49)
Sand (C-Mat-Lead statement-S.No.1)
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

0.90 cum
0.45 cum
400.00 Kgs
Sub Total of - A

B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigationS.N.16)
Vibrator hire
charges ( Hire charges-irrigation. Sn.41)
Water (including for curing) -M-189-b. irrigation SSR
Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit
Total
VAT & Labour cess.
Rate per One Cum
a

for pre cast/ Cast-in-situ Chamber cover not exceeding 0.45m


width with hooks for lifting

ii

RCC M 20 Slabs

0.067 day
0.133 day
2.500 day

0.267 hour
0.267 hour
1.200 kl

14%
0%

150 mm

R.C.C. M 20 nominal mix Per Cum


Centering charges ,Pg No.106 to 108
Labour charges,Pg No.106 to 108
Add Labour component @

1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

VAT & Labour cess.


Rate per One Cum
42

0%

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conve
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)

0.15 Cum
337269598.xlsx - data-WS & Sewer (2)

Page 1885 of 3205

B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & Labour cess.
Rate per 10 Sqm

337269598.xlsx - data-WS & Sewer (2)

0.60 Nos
0.96 Nos
14%
0%

Page 1886 of 3205

43

BLD-CSTN-8-8-(83) : Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and conv
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total A+B
C.Overheads & Contractors Profit
Sub-Total
VAT & labour cess
Rate per 10 Sqm

44

14%
0%

0.210 Nos
2.000 Kg
0.660 Nos
1.540 Nos
3.70 Nos
14%
0%

BLD-CSTN-9-5: White washing two coats with whiting of approved quality to give an even shade after thoroughly bru
dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such a
complete for finished item of work, but excluding conveyance charges of materials
Whiting / White Cement -BMS-W.68-item-1012
Gum, conjee water, or prickly pear juice including necessary fire
wood
Brick Layers / Painter ( labour - Irri-Skilled-Sn.11)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Sundries including brushes, ladders, etc.,
over heads & contractors profit
Sub-Total
VAT & labour cess
Rate per 10 Sqm

46

0.94 Nos
0.16 Nos

BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm t
compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, ex
materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and
off junctions of wall and slab etc,, complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3
Water proof compound -BMT-H.01- item no.241
B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Total
over heads & contractors profit
Total cost for 10 sqm
VAT & labour cess
Rate per 10 Sqm

45

0.21 Cum

2.00 Kg
LS
0.21 Nos
0.32 Nos
1%
14%
0%

BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work &
and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., com
(APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.(BMT-J.31-Sn-400)
337269598.xlsx - data-WS & Sewer (2)

0.70 Ltr

Page 1887 of 3205

1st Class Painter (I. Skilled Labour-Irrigation-Sn.35)


2nd Class Painter (II. Semi skilled Labour-Irri-Sn.37)
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
Total cost for 10 sqm
VAT & Labour cess.
Rate per 10 Sqm
47

14%
0%

BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightenin
sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of ste
such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and al
charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., com
in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire- SSR (Irrigation) item No 3, Pg 11
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Blacksmith/ Bar bender ( Labour-Irrigation-Skilled-Sn.1)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
Sundries on Material
(c) Overheads on (a+b)
(d) Contractors profit on (a+b+c)
Rate per t = a+b+c+d
VAT & Labour cess.
Rate per One MT
Rate per One Kg
48

0.21 day.
0.49 day.

1.05 Ton
6.00 kg

10.00 day
10.00 day

14%
0%

BLD-CSTN-9-5-(103): Flooring with Glass Mosaic Tiles Group 1 series or equivalent quality 20x20x4 mm
cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of hon
3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, inc
cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of w
conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Glass Mosaic Tiles Group 1 series or equivalent quality 20x20x4 mm
thick
-BMT-C.18,
Sn.55
Cement
for CM (1:8)
for base coat
Cement for slurry
Cement for Pointing with CM (1:3)
Sand for CM (1:8)
Sand for pointing
B. LABOUR
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (Both Men and Women) (irri-Un skilled-Sn.3)
Add water charges 1%
Grand Total

10.50
21.60
33.00
6.000
0.12
0.020

sqm
kg.
kg.
kg.
cum
cum

0.96
2.24
3.30

day
day
day

1%

337269598.xlsx - data-WS & Sewer (2)

Page 1888 of 3205

over heads & contractors profit


Total cost for 10 sqm
VAT & labour cess

14%
0%
Rate per 10 Sqm

337269598.xlsx - data-WS & Sewer (2)

Page 1889 of 3205

III

COST OF PIPES, LOWERING AND JOINTING CHARGES


Cost of DI pipes as per separate sheet

Lowering of DI pipes

Sub Analysis for Lowering


Lowering C.I. Pipes, A class and specials with s/s ends carefully into trench and laying them true to alignment and
but excluding cost and conveyance of pipes from source of supply. (Reference to specifications. BIS No.3114/94)

Assumtion 10 m
200 mm dia CI pipes 5m long (class A)
Weight = 2 x 257 kgs = 514 kgs = 5.14 quintal
(a) LABOUR:
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
(b) Cost for 10 metres
Rate per metre = b/10
Rate for 1 kg = b/514
49

0.102 day
0.238 day
1.330 day

PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into tre
alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of sup
No.3114/1994)

Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be as per sub-analysis made
ends.
Details of cost for 5m
Lowering 80 mm dia DI pipe
Weight of 5m length = (79 +85.5 + 92)/3 = 85.5 kgs
(a) Labour charges for laying
85.500 Kg
(b) Overheads & Contractors Profit
14%
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
0%
Rate per each cut
Lowering 100 mm dia DI pipe
Weight of 5m length = (100+109+117)/3 = 108.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 125 mm dia DI pipe
Weight of 5m length = (130+141+153)/3 = 141.33 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 150mm dia DI pipe
Weight of 5m length = (162+178+191)/3 = 177 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
337269598.xlsx - data-WS & Sewer (2)

108.670 Kg
14%

0%

141.330 Kg
14%

0%

177.000 Kg
14%

Page 1890 of 3205

(c) Cost for 5 metres = a+b


Rate per metre = c/5
VAT & Labour cess.

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1891 of 3205

Lowering 200 mm dia DI pipe


Weight of 5m length = (237+257+278)/3 = 257.33 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 250 mm dia DI pipe
Weight of 5m length = (319+348+376)/3 = 347.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 300 mm dia DI pipe
Weight of 5m length = (412+450+487)/3 = 449.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 350 mm dia DI pipe
Weight of 5m length =(519+563+610)/3=564
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

257.330 Kg
14%

0%

347.670 Kg
14%

0%

449.670 Kg
14%

0%

564.000 Kg
14%

0%
Rate per each cut

Lowering 400 mm dia DI pipe


Weight of 5m length =(631+690+744)/3=688.33
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

688.330 Kg
14%

0%
Rate per each cut

Lowering 450mm dia DI pipe


Weight of 5m length =(761+836+901)/3=832.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

832.670 Kg
14%

0%
Rate per each cut

Lowering 500 mm dia DI pipe


337269598.xlsx - data-WS & Sewer (2)

Page 1892 of 3205

Weight of 5m length =(892+971+1049)/3=970.67


(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

970.670 Kg
14%

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1893 of 3205

Lowering 600 mm dia DI pipe


Weight of 5m length =(1188+1296+1404)/3=1296
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

1296.000 Kg
14%

0%
Rate per each cut

Lowering 700mm dia DI pipe


Weight of 5m length =(1533+1675+1808)/3=1672
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

1672.000 Kg
14%

0%
Rate per each cut

Lowering 750 mm dia DI pipe


Weight of 5m length =(1718+1876+2029)/3=1874.33
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 800 mm dia DI pipe
Weight of 5m length =(1922+2093+2263)/3=2092.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.
Rate per each cut
Lowering 900 mm dia DI pipe
Weight of 5m length =(2342+2544+2766)/3=2554
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

1874.330 Kg
14%

0%

2092.670 Kg
14%

0%

2544.000 Kg
14%

0%
Rate per each cut

Lowering 1000 mm dia DI pipe


Weight of 5m length =(2814+3072+3318)/3=3068
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5
VAT & Labour cess.

3068.000 Kg
14%

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1894 of 3205

Jointing of DI pipes
Sub Analysis : (Basic Data) for Jointing of DI Pipes

OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure includi
minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class ( Labour-Irrigation-Skilled-Sn.6)
Fitters II Class ( Labour-Irrigation-semi Skilled-Sn.9)
Machinery
Hire chargers for Hydralic field test pressure testing including
transportation of water @ Rs. 1200/- (1000+200) / day
Materials
Pressure guage
3/4" G.I. Pipe (20 mm) ( excluding labour charges)
Specials
Dummies

3.000 day
3.000 day
3.000 days

0.050 Nos
3.000 RM
1 Ls
0.100 No.
60.000 Lts.

Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22-Irri. SSR)

(T) Total Rate per 500 Mts.


(r) Rate per 1 Rmt for 450 mm dia
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r
Note : Proportionate Testing Charges may be arrived, keeping the diametre of pipe based on this analysis
various Dia Pipes.
50

PHE-JCIR-4 : Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the g
filling with water, with a water lead up to 500m and testing to required pressure, etc. complete Re
3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.
Details of cost for 10 Joints
Jointing 80 mm dia DI pipe
a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

80 mm dia
0.300 day
0.800 day

- each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1895 of 3205

Jointing 100 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

100 mm dia
0.500 day
1.000 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 125 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

125 mm dia
0.500 day
1.000 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 150 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

150 mm dia
0.600 day
1.100 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
337269598.xlsx - data-WS & Sewer (2)

14%

Page 1896 of 3205

Rate per joint = h/10


VAT & Labour cess.

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1897 of 3205

Jointing 200 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

200 mm dia
0.600 day
1.100 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 250 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

250 mm dia
0.620 day
1.200 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 300 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

300 mm dia
0.800 day
1.200 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
337269598.xlsx - data-WS & Sewer (2)

14%

Page 1898 of 3205

VAT & Labour cess.

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1899 of 3205

Jointing 350 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

350 mm dia
0.900 day
1.500 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 400 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

400 mm dia
1.000 day
1.500 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 450 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

450 mm dia
1.200 day
1.700 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
337269598.xlsx - data-WS & Sewer (2)

14%

Page 1900 of 3205

VAT & Labour cess.

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1901 of 3205

Jointing 500 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

500 mm dia
1.300 day
1.800 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 600 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

600 mm dia
1.500 day
2.000 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 650 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

650 mm dia
1.600 day
2.100 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
337269598.xlsx - data-WS & Sewer (2)

14%

Page 1902 of 3205

VAT & Labour cess.

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1903 of 3205

Jointing 700 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

700 mm dia
1.700 day
2.200 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 750 mm dia DI pipe


a) Labour
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

750 mm dia
1.700 day
2.200 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 800 mm dia DI pipe


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Foreman (work inspector) Non technical (Labour -Irrigation-Skilled
-Sn.10)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

800 mm dia
2.350 day
4.700 day
0.650 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
337269598.xlsx - data-WS & Sewer (2)

14%

Page 1904 of 3205

Rate per joint = h/10


VAT & Labour cess.

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1905 of 3205

Jointing 900 mm dia DI pipe


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Foreman (work inspector) Non technical (Labour -Irrigation-Skilled
-Sn.10)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

900 mm dia
2.750 day
5.500 day
0.700 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

Jointing 1000 mm dia DI pipe


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Foreman (work inspector) Non technical (Labour -Irrigation-Skilled
-Sn.10)
b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

1000 mm dia
3.000 day
6.000 day
0.750 day

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1906 of 3205

51

PHE-JCIF-5 : Jointing CI pipes, fittings and valves with flanged ends including cost of jointing materials
white lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Re
No.3114/1994.)
Details of cost for 10 joints
80 mm dia
a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)

0.090 day
0.210 day
0.800 day

b) Material
Bolts and nuts 16mm dia 60mm long ( Sn.5-Table-31,Pg.82-2014-15)

6.800 kg

Rubber insertion 5mm thick (Sn-4-Table-31,Pg.82-2014-15)

2.125 kg

White lead
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

80 mm dia

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

100 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 16mm dia 60mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

100 mm dia
0.150 day
0.350 day
1.000 day

13.600 kg
2.540 kg

27.500 rm

14%

Rate per each joint

337269598.xlsx - data-WS & Sewer (2)

Page 1907 of 3205

125 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 16mm dia 60mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

125 mm dia
0.150 day
0.350 day
1.000 day

13.600 kg
3.140 kg

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10

14%

Rate per each joint


d

150 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 20mm dia 65mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

150 mm dia
0.180 day
0.420 day
1.100 day

24.000 kg
4.300 kg

27.500 rm

14%

0%
Rate per each joint

200 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 20mm dia 70mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
337269598.xlsx - data-WS & Sewer (2)

200 mm dia
0.180 day
0.420 day
1.100 day

25.200 kg
6.160 kg

27.500 rm

Page 1908 of 3205

(e) Add for water charges @ 1% on Labour & Testing Charges


(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

337269598.xlsx - data-WS & Sewer (2)

Page 1909 of 3205

250 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 20mm dia 75mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

250 mm dia
0.200 day
0.420 day
1.200 day

39.600 kg
8.500 kg

27.500 rm

14%

0%
Rate per each joint

300 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 20mm dia 75mm long
Rubber insertion 5mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

300 mm dia
0.240 day
0.560 day
1.200 day

39.600 kg
10.280 kg

27.500 rm

14%

0%
Rate per each joint

350 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 20mm dia 80mm long
Rubber insertion 8mm thick
White lead
c) Testing

337269598.xlsx - data-WS & Sewer (2)

350 mm dia
0.300 day
0.600 day
1.500 day

54.400 kg
21.260 kg

Page 1910 of 3205

Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

400 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 24mm dia 85mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

400 mm dia
0.300 day
0.700 day
1.500 day

98.400 kg
27.640 kg

27.500 rm

14%

0%
Rate per each joint

450 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 24mm dia 85mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

450 mm dia
0.360 day
0.840 day
1.700 day

123.000 kg
22.660 kg

27.500 rm

14%

0%
Rate per each joint

500 mm dia DI flanged ends


a) Labour

500 mm dia

337269598.xlsx - data-WS & Sewer (2)

Page 1911 of 3205

Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)


Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

0.390 day
0.910 day
1.800 day

134.000 kg
38.190 kg

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

600 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

600 mm dia
0.45 day
1.05 day
2.00 day

192.00 kg
51.71 kg

27.50 rm

14%

0%
Rate per each joint

700 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c

337269598.xlsx - data-WS & Sewer (2)

700 mm dia
0.51 day
1.19 day
2.20 day

244.80 kg
68.91 kg

27.500 rm

Page 1912 of 3205

(e) Add for water charges @ 1% on Labour & Testing Charges


(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

750 mm dia DI flanged ends


a) Labour
Plumber 1st class ( Labour-Irrigation-Skilled-Sn.36)
Plumber 2nd class ( Labour-Irrigation-S.Skilled-Sn.9)
Mazdoor ( Labour-Irrigation-Unskilled-S.N.3)
b) Material
Bolts and nuts 24mm dia 90mm long
Rubber insertion 8mm thick
White lead
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

750 mm dia
0.510 day
1.190 day
2.200 day

260.400 kg
78.430 kg

27.500 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
VAT & Labour cess.

14%

0%
Rate per each joint

800 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg -3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

800 mm dia
1 No
14%
0%
Rate per each joint

900 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg - 3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

900 mm dia
1 No
14%
0%
Rate per each cut

1000 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg - 3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

1000 mm dia
1 No
14%
0%
Rate per each cut

1100 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg - 3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

1100 mm dia
1 No
14%
0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1913 of 3205

1200 mm dia DI flanged ends


Basic rate as per SSR item No.10 - Pg - 3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

1200 mm dia
1 No
14%
0%
Rate per each cut

52

BMW-G.01: Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer a
with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but wit
tanks
Rate as per BMW-G.01 Sn.335 of 2013-14 -B. SSR
labour charges-BMW-G.02, S.n.336-B.SSR
Total
Overheads & Contractors Profit
Total
VAT & Labour cess.

1.00 Lit

20%
14%
0%
Rate per 1 Lit

53

Providing, Laying & Jointing of the following DI pipes of K7 class as per ISI with spigot and socket ends, with all ne
including cost of DI pipes and specials and rubber rings, lowering, laying, jointing and testing to required pressure inc
all materials to the site, labour charges etc., etc. complete. ( Rates are inclusive of CP & OH )

100mm dia.DI K7 class (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data-34.b
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

150mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

200mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

250mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
337269598.xlsx - data-WS & Sewer (2)

1 Rmt
0.18 No
1 Rmt
0.18 No

Page 1914 of 3205

VAT & Labour cess.

0%
Rate per 1 Rmt

300mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

350mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

400mm dia.DI K7 (per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

500mm dia.DI K7(per Rmt)


Basic rate of DI pipe as per separate sheet
Cost of Rubber gasket ( Rate/5.50Rmt)
Lowering Charges as per data . 34
Jointing charges ( Rate/5.50 Rmt)
Total
VAT & Labour cess.

1 Rmt
0.18 No
1 Rmt
0.18 No
0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1915 of 3205

54
a

PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains where ever required (.Dia of pipes in mm.)
Details of cost for one cutting
Cutting C.I./ DI Pipe -80 mm dia
(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.060 day
0.060 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.
Rate per each cut
b

14%
0%

Cutting C.I./ DI Pipe -100 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.080 day
0.080 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe -125 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.110 day
0.110 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe -150 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.150 day
0.150 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe -200 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.200 day
0.200 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 250 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor
(b) Overheads & Contractors Profit
Rate per each m
337269598.xlsx - data-WS & Sewer (2)

0.250 day
0.250 day
14%

Page 1916 of 3205

VAT & Labour cess.

0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1917 of 3205

Cutting C.I./ DI Pipe - 300 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.300 day
0.300 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 350 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.350 day
0.350 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 400 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.400 day
0.400 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 450 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.450 day
0.450 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 500 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.500 day
0.500 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 600 mm dia


(a) Labour
Asst. Fitter / Plumber 2nd class
Man mazdoor

0.600 day
0.600 day

(b) Overheads & Contractors Profit


Rate per each m
VAT & Labour cess.

14%
0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1918 of 3205

Cutting C.I./ DI Pipe - 700 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

337269598.xlsx - data-WS & Sewer (2)

Page 1919 of 3205

Cutting C.I./ DI Pipe - 750 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 800 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 900 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 1000 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 1100 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

Cutting C.I./ DI Pipe - 1200 mm dia


Rate as per PH SSR S.No.22, Pg.5 & 6
(b) Overheads & Contractors Profit
Rate per each m
VAT & Labour cess.

1 No
14%
0%
Rate per each cut

55

Railway crossing/Road crossing/Canal crossing by adopting trenchless technology tunneling work through speci
erecting the equipment to true to the alignment and gradient, by hydraulic pipe jacking technique complete includ
types of soils including hard rock and construction of RCC chambers suitable to casing pipe pits, and conveyance c
required materials but excluding cost of encasing pipe, in co-ordination with the concerned authorities as per appr
the Engineer-in Charge.

800 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 800 mm dia MS pipe-10mm thick
Overheads & Contractors Profit
VAT & Labour cess.
Rate per 1 Rmt

1 Rmt
1 Rmt
14%
0%

900 mm dia
Basic Rate as per table.33 of PH SSR
337269598.xlsx - data-WS & Sewer (2)

1 Rmt

Page 1920 of 3205

Cost of 900 mm dia MS pipe-10mm thick


Overheads & Contractors Profit
VAT & Labour cess.
Rate per 1 Rmt

1 Rmt
14%
0%

337269598.xlsx - data-WS & Sewer (2)

Page 1921 of 3205

1000 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1000 mm dia MS pipe-10mm thick
Overheads & Contractors Profit
VAT & Labour cess.
Rate per 1 Rmt

1100 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1100 mm dia MS pipe-10mm thick

VAT & Labour cess.


Rate per 1 Rmt
1200 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1200 mm dia MS pipe-10mm thick

VAT & Labour cess.


Rate per 1 Rmt
1300 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1300 mm dia MS pipe-10mm thick

VAT & Labour cess.


Rate per 1 Rmt

1 Rmt
1 Rmt
14%

1 Rmt
1 Rmt
14%
0%

1400 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1400 mm dia MS pipe-10mm thick
Overheads & Contractors Profit
VAT & Labour cess.
Rate per 1 Rmt

14%

0%

Overheads & Contractors Profit

1 Rmt
1 Rmt

0%

Overheads & Contractors Profit

14%
0%

Overheads & Contractors Profit

1 Rmt
1 Rmt

1 Rmt
1 Rmt
14%
0%

1500 mm dia
Basic Rate as per table.33 of PH SSR
Cost of 1500 mm dia MS pipe-10mm thick
Overheads & Contractors Profit
VAT & Labour cess.
Rate per 1 Rmt

1 Rmt
1 Rmt
14%
0%

337269598.xlsx - data-WS & Sewer (2)

Page 1922 of 3205

56

OBSERVED DATA
Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long 16mm dia cold twisted deformed steel
driven in to the hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of a
drilling and cleaning hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m an

Unit - 10 Nos

16 mm dia

A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 1.50m length

23.70 Kg

Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141 - R


& B SSR-2013-14 ( 10Nos x 0.75m)

7.5 Rmt

Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg No.
19 - R & B SSR-2013-14 ( 10Nos x 0.75m)

7.5 Rmt

B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Rate per 10 Nos
Rate per 1 Nos

0.50 day
0.50 day
1.00 day

Rate per Each

VAT & Labour cess.


Rate per 1 No
b

0%

HDPE Service Line - with 110mm dia -PE.100, 6Kg pipe

Unit

Rate of 110mm OD -HDPE 6 Kg/Sqcm -PE-100 pipe as per work


sheet
Earth work Excavation -100 x 0.5 x1.10
Sand Bedding : 100 x 0.5 x 0.10
Lowering and Jointing Charges
Rate per 100 Rmt
Rate per 1 Rmt
Add for Specials and fittings etc at 2%

100 Rmt

VAT & Labour cess.


Rate per 1 Rmt
Removal of Telephone/Electric Poles and Lines

100

55.00 Cum
5.00 Cum
100.00 Rmt

0%

RBR-STCL-23: Removal of telephone/electric poles with wires including excavation and dismantling of foundation
supervision of concerned department, disposal with all lifts and upto a lead of 1000 m and stacking the serviceab
separately as per Technical Specification Clause 202 MORD / MORTH.
Unit = each
Taking output = 30 Nos.
a) labour
Mate
Mazdoor (Unskilled)
Electrician / Lineman
b) Machinery
Tractor with trolley 3t

30

c&d) Overheads & Contractors Profit


Cost for 30 poles = a+b+c+d
Rate per pole = (a+b+c+d)/30
VAT & Labour cess.

10.480
2.000

day
day
day

1.500

hour

14%

0%
Rate per each

337269598.xlsx - data-WS & Sewer (2)

Page 1923 of 3205

58

Shifting and errection of electric poles, telephone poles coming across the proposed alignment of the pipeline includ
material and all labour charges etc,. Complete.
Removal of telephone/electric poles
1 No
PSCC Pole (8.0 m) - 140 Kg WL (as per electrical cost data (APSEB)
1 No
for the year 2013-14 under centralised material for RE and
distribution works vide Pg.1-5, S.N-14)
CC (1:4:8) for foundation (pi x r2 x h ) = 3.14 x (0.30)2 x 0.75
CC (1:2:4) for support above GL (pi x r2 x h ) = 3.14 x (0.25)2 x 0.50

0.21 Cum
0.10 Cum

Erection charges of Electrical pole


Rate per each
59

Shifting of under ground cables coming across the proposed alignment of the pipeline including Earth work exc
backfilling etc, complete.
RBR-FNDN-1- (i-B) - EWE In ordinary soils, by Mechanical means
per 1 Rmt - 1 x0.45 x 0.75 = 0.3375 cum

0.3375 Cum

Labour charges for shifting the cable and repairs etc


Rate per 1 Rmt
60

Manufacturing ,Supplying and errection of air valve gaurd cabins of size 0.90 x0.90 x 0.90 m made with 4 nos vertica
of size 50x8 mm and 12mm dia MS round bars fixed at 10 cm c/c with door and locking arrangements as per app
by the departmental officers and painting both sides with anti corrossive paint two coats over one coat of primery coa
, fabrication ,welding , transportation to site, all taxes and duties,fixing in position duly embodying in CC(1:4:8) prop
operational charges etc complete for finished item of work.
MS flats of size 50 x 8mm @39.20Kg/Sqm
Horizontals
Vericals including 0.45m legs
12mm dia MS bars at 10cm c/c @ 0.89Kg / Rmt (0.90 / 0.075 = 12 Nos)

8
4

Painting with synthetic enamyl paint


Earth work
CC (1:2:4)
Abstract
Cost of MS Angles
Cost of MS Rods
Add fabrication charges - BMM-V.14. Bld SSR-2013-14
Add Municipal allowence on Labour component
Painting with synthetic enamyl paint
Earth work
CC (1:2:4)
Add for Locking arrangements,Transport , etc.

0.95
1.40
12

5
4
4

0.45
0.45
25.88 Kg
48.06 Kg
73.94 Kg
20%
12.96 Sqm
0.41 Cum
0.41 Cum

VAT & Labour cess.

0%
Total

61

SWG pipes & RCC Pipes for Sewer Lines


Supply and delivery of Salt Glazed Pipes of ISI make conforming to ISI 651 including cost and conveyance
transporation, unloading at site and stacking etc, complete
Cost of the pipes as per Pg. 114 of Sanitary and water supply section BSSR 2013-14
150mm dia SWG - SP-1
Supply of SWG SP-1 pipe conforming to ISI 651 - 6" dia (152.4mm)
1 Rmt
BMW-A.16/Pg-114
c&d) Overheads & Contractors Profit
14%
Total Rs. Per 1 Rmt
Add VAT & Labour cess etc. @
0%
337269598.xlsx - data-WS & Sewer (2)

Page 1924 of 3205

Rate per 1 Rmt


b

200mm dia SWG - SP-1


Supply of SWG SP-1 pipe conforming to ISI 651 - 8" dia (203.2mm)
BMW-A.17/Pg-114
c&d) Overheads & Contractors Profit
Total Rs. Per 1 Rmt
Add VAT & Labour cess etc. @
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

1 Rmt
14%
0%

Page 1925 of 3205

62

250mm dia SWG - SP-1


Supply of SWG SP-1 pipe conforming to ISI 651 - 10" dia (254 mm)
BMW-A.18/Pg-114
c&d) Overheads & Contractors Profit
Total Rs. Per 1 Rmt
Add VAT & Labour cess etc. @
Rate per 1 Rmt
300mm dia SWG - SP-1
Supply of SWG SP-1 pipe conforming to ISI 651 - 12" dia (300 mm)
BMW-A.19/Pg-114
c&d) Overheads & Contractors Profit
Total Rs. Per 1 Rmt
Add VAT & Labour cess etc. @
Rate per 1 Rmt
350mm dia SWG - SP-1
Supply of SWG SP-1 pipe conforming to ISI 651 - 14" dia (350 mm)
BMW-A.20/Pg-114
c&d) Overheads & Contractors Profit
Total Rs. Per 1 Rmt
Add VAT & Labour cess etc. @
Rate per 1 Rmt
400mm dia SWG - SP-1
Supply of SWG SP-1 pipe conforming to ISI 651 - 16" dia (400 mm)
BMW-A.21/Pg-114
c&d) Overheads & Contractors Profit
Total Rs. Per 1 Rmt
Add VAT & Labour cess etc. @
Rate per 1 Rmt
450mm dia SWG - SP-1
Supply of SWG SP-1 pipe conforming to ISI 651 - 18" dia (450 mm)
BMW-A.22/Pg-114
c&d) Overheads & Contractors Profit
Total Rs. Per 1 Rmt
Add VAT & Labour cess etc. @
Rate per 1 Rmt

1 Rmt
14%
0%

1 Rmt
14%
0%

1 Rmt
14%
0%

1 Rmt
14%
0%

1 Rmt
14%
0%

PHE - LJSW-13: Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of s
of jointing material such as cement mortar (1:1) proportion
and hemp yarn but excluding cost and conve
specifications BIS No. 6530/72)
Detail cost for 30 meters
SWG -SP-1,2 &3 Pipes
150 mm dia - SWG
(a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrin-Semi Skilled. Sn.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)
b) Material
150 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum ( C-Mat-Sn.3- sand for Mortar)
Spun yarn = 0.09x50=4.50 (Table -31 -S.No.3) Pg-82
337269598.xlsx - data-WS & Sewer (2)

0.900 day
2.100 day
4.000 day
1.000 day
50.000 each
0.097 t
0.068 cum
9.000 kgs

Page 1926 of 3205

(c) Total = a+b


(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
Add VAT & Labour cess etc. @
Rate per 1 Rmt
b

200 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)
b) Material
200 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50 (Table -36) Pg-372
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
Add VAT & Labour cess etc. @
Rate per 1 Rmt
230 mm dia - SWG
(a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)
b) Material
230 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
Add VAT & Labour cess etc. @
Rate per 1 Rmt
250 mm dia - SWG
(a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)
b) Material
337269598.xlsx - data-WS & Sewer (2)

14%

0%

1.050 day
2.450 day
4.500 day
1.250 day
50.000 each
0.130 t
0.091 cum
12.000 kgs

14%

0%

1.200 day
2.800 day
5.000 day
1.500 day
50.000 each
0.146 t
0.102 cum
13.500 kgs

14%

0%

1.350 day
3.150 day
5.500 day
1.500 day

Page 1927 of 3205

250 mm dia SW pipe 60cm long


Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50 (Table -36) Pg-372
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30

50.000 each
0.162 t
0.113 cum
15.000 kgs

14%

Rate per 1 RM
Add VAT & Labour cess etc. @
Rate per 1 Rmt

0%

337269598.xlsx - data-WS & Sewer (2)

Page 1928 of 3205

300 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

1.500 day
3.500 day
6.000 day
1.500 day

b) Material
300 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30

50.000 each
0.194 t
0.136 cum
18.000 kgs

14%

Rate per 1 RM
Add VAT & Labour cess etc. @
Rate per 1 Rmt
f

0%

350 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

1.650 day
3.850 day
7.000 day
1.750 day

b) Material
350 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30

50.000 each
0.225 t
0.159 cum
21.000 kgs

14%

Rate per 1 RM
Add VAT & Labour cess etc. @
Rate per 1 Rmt
g

0%

400 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)
b) Material
400 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
337269598.xlsx - data-WS & Sewer (2)

1.800 day
4.200 day
8.000 day
1.750 day
50.000 each
0.256 t
0.181 cum
24.000 kgs

Page 1929 of 3205

(e) Total = c+d


(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30

14%

Rate per 1 RM
Add VAT & Labour cess etc. @
Rate per 1 Rmt

0%

337269598.xlsx - data-WS & Sewer (2)

Page 1930 of 3205

63
a
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

b
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

450 mm dia - SWG


(a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)
b) Material
450 mm dia SW pipe 60cm long
Cement for 50 joints =0.045 cum
Sand = 0.045 cum
Spun yarn = 0.09x50=4.50
(c) Total = a+b
(d) Add for water charges @ 1% on Labour & Testing Charges
(e) Total = c+d
(f) Overheads & Contractors Profit
(g) Cost for 30 m (e+f)
Rate per metre = g/30
Rate per 1 RM
Rate per 1 Rmt

2.100 day
4.900 day
10.000 day
2.000 day
50.000 each
0.293 t
0.204 cum
27.000 kgs

14%

Manufacture,supply and delivery of RCC Socket and Spigot Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate
including Transportation, Central Excice Duty, Sales Tax etc.complete.
RCC NP3 S/S pipe - 300mm dia
Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
1 Rmt
SSR Rate of Cement / MT
1 MT
Market Rate of Cement / MT
1 MT
Cement required per 1 Rmt
14.40 Kg
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
1 MT
Market Rate of MS rods/ MT
1 MT
MS rods required per 1 Rmt
3.03 Kg
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
10 Km
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
14%
Add CED @ 12.36%
12.50%
Add ST @ 5%
5.00%
Cost of pipe per 1 Rmt
Cost of pipe per 1 Rmt
RCC NP3 S/S pipe - 350mm dia
Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
337269598.xlsx - data-WS & Sewer (2)

1 Rmt
1 MT
1 MT
36.00 Kg
1 MT
1 MT
4.37 Kg

10 Km

Page 1931 of 3205

Rate up to 5 Kms Lead


Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Cost of pipe per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

13.62%
12.50%
5.00%

Page 1932 of 3205

c
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

d
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

e
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

RCC NP3 S/S pipe - 400mm dia


Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP3 S/S pipe - 450mm dia
Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP3 S/S pipe - 500mm dia
Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
337269598.xlsx - data-WS & Sewer (2)

1 Rmt
1 MT
1 MT
39.60 Kg
1 MT
1 MT
4.79 Kg

10 Km

13.62%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
43.20 Kg
1 MT
1 MT
5.33 Kg

10 Km

13.62%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
50.40 Kg
1 MT
1 MT
6.47 Kg

10 Km

Page 1933 of 3205

Rate for every additional 1 KM lead or part thereof


Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
f
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

g
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

h
P1
C1

RCC NP3 S/S pipe - 600mm dia


Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP3 S/S pipe - 700mm dia
Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP3 S/S pipe - 800mm dia
Basic Rate of RCC NP3 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
337269598.xlsx - data-WS & Sewer (2)

13.62%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
64.80 Kg
1 MT
1 MT
9.19 Kg

10 Km

13.62%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
75.60 Kg
1 MT
1 MT
13.61 Kg

10 Km

13.62%
12.50%
5.00%
0%

1 Rmt
1 MT

Page 1934 of 3205

C2
Wc
R1
S1
S2
Ws
R2

Market Rate of Cement / MT


Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt

1 MT
97.20 Kg
1 MT
1 MT
18.57 Kg

10 Km

13.62%
12.50%
5.00%
0%

RCC NP4 S/S pipe -for Mains


i
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

j
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

RCC NP4 S/S pipe - 400mm dia


Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP4 S/S pipe - 450mm dia
Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
337269598.xlsx - data-WS & Sewer (2)

1 Rmt
1 MT
1 MT
39.60 Kg
1 MT
1 MT
4.79 Kg

10 Km

13.62%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
43.20 Kg
1 MT
1 MT
5.33 Kg

10 Km

Page 1935 of 3205

Add over heads & CP on pipe


Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
k
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

l
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

m
P1
C1
C2
Wc
R1

RCC NP4 S/S pipe - 500mm dia


Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP4 S/S pipe - 600mm dia
Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Add VAT & Labour cess etc. @
Cost of pipe per 1 Rmt
RCC NP4 S/S pipe - 700mm dia
Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
337269598.xlsx - data-WS & Sewer (2)

13.62%
12.50%
5.00%
0%

1 Rmt
1 MT
1 MT
50.40 Kg
1 MT
1 MT
6.47 Kg

10 Km

14%
12.36%
5.00%
0%

1 Rmt
1 MT
1 MT
64.80 Kg
1 MT
1 MT
9.19 Kg

10 Km

14.00%
12.36%
5.00%
0%

1 Rmt
1 MT
1 MT
75.60 Kg

Page 1936 of 3205

S1
S2
Ws
R2

n
P1
C1
C2
Wc
R1
S1
S2
Ws
R2

SSR Rate of MS rods / MT


Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Cost of pipe per 1 Rmt
RCC NP4 S/S pipe - 800mm dia
Basic Rate of RCC NP4 S/S pipe as per Table - 3 of SSR
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4000-5600)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 41000-43000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads & CP on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt
Cost of pipe per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

1 MT
1 MT
13.61 Kg

10 Km

14.00%
12.36%
5.00%

1 Rmt
1 MT
1 MT
97.20 Kg
1 MT
1 MT
18.57 Kg

10 Km

14.00%
12.36%
5.00%

Page 1937 of 3205

64

Manufacture,supply and delivery of Rubber rings to suit RCC Socket and Spigot Pipes confirming to B.I.S. 53
RUBBER RING) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT etc.complete.

Dia of the Rubber Ring

Basic Cost

RCC NP2 S/S pipe - 80mm dia


RCC NP2 S/S pipe - 100mm dia
RCC NP2 S/S pipe - 150mm dia
RCC NP2 S/S pipe - 200mm dia
RCC NP2 S/S pipe - 225mm dia
RCC NP2 S/S pipe - 250mm dia
RCC NP2 S/S pipe - 300mm dia
RCC NP2 S/S pipe - 350mm dia
RCC NP2 S/S pipe - 400mm dia
RCC NP2 S/S pipe - 450mm dia
RCC NP2 S/S pipe - 500mm dia
RCC NP2 S/S pipe - 600mm dia
RCC NP2 S/S pipe - 700mm dia
RCC NP2 S/S pipe - 800mm dia
B

Dia of the Rubber Ring

29.00
35.00
63.00
74.00
81.00
91.00
111.00
129.00
142.00
161.00
210.00
276.00
375.00
476.00
Basic Cost

RCC NP3 S/S pipe - 300mm dia


RCC NP3 S/S pipe - 350mm dia
RCC NP3 S/S pipe - 400mm dia
RCC NP3 S/S pipe - 450mm dia
RCC NP3 S/S pipe - 500mm dia
RCC NP3 S/S pipe - 600mm dia
RCC NP3 S/S pipe - 700mm dia
RCC NP3 S/S pipe - 800mm dia
RCC NP3 S/S pipe - 900mm dia
RCC NP3 S/S pipe - 1000mm dia

143.00
171.00
194.00
220.00
252.00
366.00
438.00
531.00
718.00
867.00

CED @

12.36%
3.58
4.33
7.79
9.15
10.01
11.25
13.72
15.94
17.55
19.9
25.96
34.11
46.35
58.83
CED @

12.36%
17.67
21.14
23.98
27.19
31.15
45.24
54.14
65.63
88.74
107.16

Sub Analysis : (Basic Data)

OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure includi
minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days) (including LC)
Fitters I Class ( Labour-Irrigation-Skilled-Sn.6)
3.000 day
Fitters II Class ( Labour-Irrigation-semi Skilled-Sn.9)
3.000 day
Machinery
Hire chargers for Hydralic field test pressure testing including
3.000 days
transportation of water @ Rs. 1200/- (1000+200) / day
Material
Pressure guage
3/4" G.I. Pipe (20 mm) cost vide ( BMW-F.81 - BMW-F.82 ) - sanitary
SSR
Specials
Dummies
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22)
(T) Total Rate per 500 Mts.
(r) Rate per 1 Rmt for 450 mm dia
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r

337269598.xlsx - data-WS & Sewer (2)

0.050 Nos
3.000 RM
1 Ls
0.100 No.
60.000 Lts.

Page 1938 of 3205

65

PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradien
testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783
Unit= 1 rmt
Taking out put 100 rmt
Lowering - RCC S/S pipes - 80 mm dia -NP-2
a) Labour
Mason 1st class(labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

80 mm dia
0.780 day
1.800 day
5.000 day
1.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

50.000 each

100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 100 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

100 mm dia
0.960 day
2.240 day
6.300 day
1.600 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

50.000 each

100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1939 of 3205

Lowering - RCC S/S pipes - 150 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

150 mm dia
1.170 day
2.730 day
7.800 day
1.600 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST
c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

50.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 200 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

200 mm dia
1.170 day
2.730 day
7.800 day
1.600 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

50.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1940 of 3205

Lowering - RCC S/S pipes - 225 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

225 mm dia
1.620 day
3.780 day
10.500 day
2.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

50.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 250 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

250 mm dia
1.620 day
3.780 day
10.500 day
2.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

50.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 300 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

300 mm dia
1.750 day
4.140 day
11.600 day
2.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c

337269598.xlsx - data-WS & Sewer (2)

40.000 each
100.000 rm

Page 1941 of 3205

(e) Add for water charges @ 1% on Labour & Testing Charges


(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

14%

0%

VAT & Labour cess.

Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1942 of 3205

Lowering - RCC S/S pipes - 350 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

350 mm dia
1.900 day
4.500 day
12.700 day
2.400 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

40.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges

(f) Total = d+e


(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 400 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

400 mm dia
2.100 day
4.900 day
13.900 day
2.900 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

40.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes - 450 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

450 mm dia
2.250 day
5.250 day
15.000 day
3.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c
337269598.xlsx - data-WS & Sewer (2)

40.000 each
100.000 rm

Page 1943 of 3205

(e) Add for water charges @ 1% on Labour & Testing Charges


(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1944 of 3205

Lowering - RCC S/S pipes - 500 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

500 mm dia
2.430 day
5.670 day
16.200 day
3.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

40.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

14%

Rate per 1 Rmt


l

Lowering - RCC S/S pipes - 600 mm dia -NP-2


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

600 mm dia
2.750 day
6.450 day
16.300 day
3.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

40.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
m

14%

Lowering - RCC S/S pipes -700 mm dia -NP-2


Basic rate as per PH SSR item No.11-B - Pg -3
Overheads & Contractors Profit
Rate per each joint

700 mm dia
1 No
14%
Rate per 1 Rmt

Lowering - RCC S/S pipes -800 mm dia -NP-2


Basic rate as per PH SSR item No.11-B - Pg -3
Overheads & Contractors Profit
Rate per each joint

800 mm dia
1 No
14%
Rate per 1 Rmt

Lowering - RCC S/S pipes -900 mm dia -NP-2


Basic rate as per PH SSR item No.11-B - Pg -3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
337269598.xlsx - data-WS & Sewer (2)

900 mm dia
1 No
14%
0%

Page 1945 of 3205

Rate per 1 Rmt


p

Lowering - RCC S/S pipes -1000 mm dia -NP-2


Basic rate as per PH SSR item No.11-B - Pg -3
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.

1000 mm dia
1 No
14%
0%
Rate per 1 Rmt

66

PHE-LRCS-6 : Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradien
testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783
Unit= 1 rmt
Taking out put 100 rmt

Lowering - RCC S/S pipes -300 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

300 mm dia
1.750 day
4.140 day
11.600 day
2.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

40.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes -350 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

350 mm dia
1.900 day
4.500 day
12.700 day
2.400 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
337269598.xlsx - data-WS & Sewer (2)

40.000 each
100.000 rm

14%

Page 1946 of 3205

VAT & Labour cess.

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1947 of 3205

Lowering - RCC S/S pipes -400 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

400 mm dia
2.100 day
4.900 day
13.900 day
2.900 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

40.000 each
100.000 rm

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes -450 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

450 mm dia
2.250 day
5.250 day
15.000 day
3.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

40.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes -500 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

500 mm dia
2.430 day
5.670 day
16.200 day
3.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)
(d) Total = a+b+c

337269598.xlsx - data-WS & Sewer (2)

40.000 each
100.000 rm

Page 1948 of 3205

(e) Add for water charges @ 1% on Labour & Testing Charges


(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1949 of 3205

Lowering - RCC S/S pipes -600 mm dia - NP-3


a) Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation-S.skilled. Sn. 35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Woman mazdoor (Labour-Irrigation-Unskilled-S.N.4)

600 mm dia
2.750 day
6.450 day
16.300 day
3.300 day

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST

c) Testing
Testing of Pipelines with required pressure (as per Sub Analysis 2 A)

40.000 each
100.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100
VAT & Labour cess.

14%

0%
Rate per 1 Rmt

Lowering - RCC S/S pipes -700 mm dia - NP-3


Basic rate as per SSR item No.11-B - Pg - 297 including cost of
rubber rings
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
Rate per 1 Rmt
Lowering - RCC S/S pipes -800 mm dia - NP-3
Basic rate as per SSR item No.11-B - Pg - 297 - including cost of
rubber rings
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
Rate per 1 Rmt
Lowering - RCC S/S pipes -900 mm dia - NP-3
Basic rate as per SSR item No.11-B - Pg - 297 - including cost of
rubber rings
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
Rate per 1 Rmt
Lowering - RCC S/S pipes -1000 mm dia - NP-3
Basic rate as per SSR item No.11-B - Pg - 297 - including cost of
rubber rings
Overheads & Contractors Profit
Rate per each joint
VAT & Labour cess.
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

700 mm dia
1 No
14%
0%

800 mm dia
1 No
14%
0%

900 mm dia
1 No
14%
0%

1000 mm dia
1 No
14%
0%

Page 1950 of 3205

67

Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of man hole covers and frames anywhere in A.P., F.O.R
un-loading & stacking at site ,central excise duty,but excluding sales tax, octroi and other Govt levies etc., as applica
Table 29, Pg No.80 of the SSR (PH items)
M.D. -10 with 500mm dia clear opening
Add CED @
Add ST @

1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

14%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

H.D.-20 with 500mm dia clear opening


Add CED @
Add ST @

1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

14%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

H.D.-20 with 560mm dia clear opening


Add CED @
Add ST @

1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

14%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

H.D.-35 with 560mm dia clear opening.


Add CED @
Add ST @

1 No
12.50%
5.00%

Overheads & Contractors Profit on basic cost

14%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

68

Manufacture as per companys standard specifications, supply and delivery of encapsulated plastic steps for man h
cost of materials packing as per companys standards, loading, transportation, unloading and stacking at site of wo
taxes such as sales tax, C.E.D and others etc., as applicable.
Table 29, Pg No.80 of the SSR
Add CED @
Add ST @

1 No
12.50%
5.00%
Total

Overheads & Contractors Profit on basic cost

14%
Rate per each

Add VAT & Labour cess etc. @

0%
Rate per each

69

Supply and delivery of Bolts and nuts with double washers including taxes and conveyance etc
Basic rate as per Table -31, Sl.No.5
Overheads & Contractors Profit
Rate per Kg
VAT & Labour cess.
Rate per Kg
337269598.xlsx - data-WS & Sewer (2)

1 Kg
14%
0%

Page 1951 of 3205

337269598.xlsx - data-WS & Sewer (2)

Page 1952 of 3205

70

BMW-A.02 : Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 &
in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting
and refilling with watering and tamping.
101.60 mm (4") dia SWG pipe upto 3' depth -Sl-2,
Pg-97 of Bld items

1.00 Rmt

labour charges for laying, jointing and testing SWG pipes up to (5') BMW-A.06, Pg.97

20%

Total
Overheads & Contractors Profit
Total

14%
Rate per 1 RM

Add VAT & Labour cess etc. @


Cost per 1 Rmt
71

0%

BMW-B.01 ; Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986
using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm in
mortar 1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole covers and frames including ex
904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all mate
water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charg
constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

Inspection chamber 3' dia and upto 3' depth


Rate as per SSR item - BMW-B.01, Pg.100
Over heads and Contractors profit @ 14%
Total

1 No.
14%
Rate per 1 No

Add VAT & Labour cess etc. @


Cost per 1 No.
72

0%

BMW-B.02: Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986
using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm in
mortar 1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole covers and frames including ex
1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all mate
water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charg
constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

Inspection chamber 3' dia and upto 5' depth


Rate as per SSR item - BMW-B.02, Pg.101
Over heads and Contractors profit @ 14%
Total

1 No.
14%
Rate per 1 No

Add VAT & Labour cess etc. @


Cost per 1 No.
73

0%

BMW-B.03: Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with c
2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm in
mortar 1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole covers and frames including exca
mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG M
and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cem
site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixin
masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

Inspection chamber 3' dia and upto 3' depth


Rate as per SSR item - BMW-B.03, Pg.101
337269598.xlsx - data-WS & Sewer (2)

1 No.

Page 1953 of 3205

Over heads and Contractors profit @ 14%


Total

14%
Rate per 1 No

Add VAT & Labour cess etc. @


Cost per 1 No.
74

0%

BMW-B.04: Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with c
2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm in
mortar 1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole covers and frames including ex
1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all mate
water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charg
constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

Inspection chamber 3' dia and upto 5' depth


Rate as per SSR item - BMW-B.04, Pg.101
Over heads and Contractors profit @ 14%
Total

1 No.
14%
Rate per 1 No

Add VAT & Labour cess etc. @


Cost per 1 No.
75

0%

BMW-A.09 : Supplying , laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded g
152.4 mm SWG pipe line all round to have 76.2 mm thick cover over the sockets.
Page 97 of the SSR, Sl.No.9
labour charges - BMW-A.10, Page 97 of the SSR, Sl.No.10

1 Rmt
20%

Total
Overheads & Contractors Profit
Total

14%
Rate per 1 RM

Add VAT & Labour cess etc. @


Cost per 1 No.

0%

DATA - SUMP & SEPTIC TANKS


76

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement c
FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)
M-30 GRADE OF MIX
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1

20mm HBG graded metal ( C-Mat- Sn.49)


Sand (C-Mat-Lead statement-S.No.1)

Mason 1st class (labour-Irri-Skilled .S.N.11)


2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (irri-Un skilled-Sn.3)
Weigh Batcher Hire charges (Machine mixing) charges
Vibrator hire charges ( Hire charges-irrigation. Sn.41)
Water (including for curing) -M-189-b. irrigation SSR
BASIC COST per 1 cum
a

Base slab and Haunches and Toe


R.C.C. M 30 Per Cum
Centering charges ,Pg No.92
337269598.xlsx - data-WS & Sewer (2)

400.00 Kg
0.800 Cum
0.400 Cum
0.133 Nos.
0.267 Nos.
4.600 Nos.
1.333 hour
1.333 hour
1.20 Kl

1.00
1.00

Cum
Cum

Page 1954 of 3205

Labour charges,Pg No.92


Add Labour component @

1.00
20%

Cum

Overheads & Contractors Profit


Total
VAT & labour cess
Rate per One Cum
77

0%

BLD-CSTN-3-14-(31)-B: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content a
LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
RCC - M-30 Grade of Mix
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal ( C-Mat- Sn.49)
Sand (C-Mat-Lead statement-S.No.1)
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (irri-Un skilled-Sn.3)
(Machine mixing) charges (Concrete mixer 300 / 200 ( diesel))

400.00 Kg
0.800 Cum
0.400 Cum
0.167 Nos.
0.167 Nos.
5.600 Nos.
1.333 hour

Vibrator hire charges ( Hire charges-irrigation. Sn.41)

1.333 hour

Water (including for curing) -M-189-b. irrigation SSR

1.20 Kl

BASIC COST per 1 cum

337269598.xlsx - data-WS & Sewer (2)

Page 1955 of 3205

Columns up to 3.66 Mts unsupported height above GL


RCC - M-30 Grade of Mix
Material charges for Centering & Scaffolding, Pg No.106 to 108
(Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No.106 to 108

1.00 Cum
1.00 Cum

Add Labour component @

20%

1.00 Cum

Basic Cost
Overheads & Contractors Profit

14%

VAT & labour cess


Rate per One Cum

0%

RCC Walls of Height up to 3.00 Mts un supported Height

Vertical walls of plane surface

Plain walls up to 3.00m height & thickness of

300 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of plain surface up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00
3.33

Overheads & Contractors Profit

14%

Cum
Sqm

Total
Rate per One Cum

Vertical walls of plane surface


b

Plain walls up to 3.00m height & thickness of

250 mm

BASIC COST per 1 cum


Centering charges for RCC vertical walls of plain surface up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00
4.00

Overheads & Contractors Profit

14%

Cum
Sqm

Total
Rate per One Cum
ii

Vertical walls of circular faces

Circular walls up to 3.00m Height & Thickness of

175 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of circular faces up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00
5.71

Overheads & Contractors Profit

14%
Total

Rate per One Cum

337269598.xlsx - data-WS & Sewer (2)

Cum
Sqm

Page 1956 of 3205

Circular walls up to 3.00m Height & Thickness of

180 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of circular faces up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00
5.56

Overheads & Contractors Profit

14%

Cum
Sqm

Total
Rate per One Cum
c

Circular walls up to 3.00m Height & Thickness of

225 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of circular faces up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00
4.44

Overheads & Contractors Profit

14%

Cum
Sqm

Total

VAT & labour cess


Rate per One Cum

0%

Circular walls up to 3.00m Height & Thickness of

250 mm

RCC - M-30 Grade of Mix


Centering charges for RCC vertical walls of circular faces up to 3 m
height. Pg-7 of PH SoR-2014-15

1.00
4.00

Overheads & Contractors Profit

14%

Cum
Sqm

Total
VAT & labour cess
Rate per One Cum
78

0%

BLD-CSTN-3-14-(31)-C : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content
suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing et
of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

RCC - M-30 Grade of Mix


Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm HBG graded metal ( C-Mat- Sn.49)
Sand (C-Mat-Lead statement-S.No.1)
Mason 1st class (labour-Irri-Skilled .S.N.11)
2nd Class Mason (labour-Irri-Semi skilled.S.N.35)
Mazdoor (irri-Un skilled-Sn.3)
(Machine mixing) charges (Concrete mixer 300 / 200 ( diesel))
Vibrator hire charges ( Hire charges-irrigation. Sn.41)
Water (including for curing) -M-189-b. irrigation SSR
BASIC COST per 1 cum
I

RCC Slabs

RCC M 30 Slabs up to 3.66 Mts height

RCC M 30 Slabs up to 3.66m Height & Thickness of

Cost of M- 30 grade mix


337269598.xlsx - data-WS & Sewer (2)

400.00 Kg
0.800
Cum
0.400
Cum
0.067
No
0.133
No
3.077
No
0.308
hour
0.308 hour
1.200
Kl

100 mm
1.00 Cum

Page 1957 of 3205

Centering charges ,Pg No.106 to 108


Labour charges,Pg No.106 to 108
Add Labour component @

10.00 Sqm
10.00 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess

0%

Rate per One Cum

337269598.xlsx - data-WS & Sewer (2)

Page 1958 of 3205

150 mm
1.00 Cum
6.67 Sqmt.
6.67 Sqm
20%

RCC M 30 Slabs up to 3.66m Height & Thickness of

Cost of M- 30 grade mix


Centering charges ,Pg No.106 to 108
Labour charges,Pg No.106 to 108
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum

0%

II

RCC Dome Slab

RCC M 30 Dome Slab up to 3.66m Height


Cost of M- 30 grade mix
Centering charges ,Pg No.106 to 108
Labour charges,Pg No.106 to 108
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
b

0%

RCC M 30 Dome Slab up to 7.32m Height


Cost of M- 30 grade mix
Centering charges ,Pg No.106 to 108
Labour charges,Pg No.106 to 108
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

Rate per One Cum


III

RCC Beams

RCC M 30 Beams up to 3.66m Height


Cost of M- 30 grade mix
Centering charges ,Pg No.106 to 108
Labour charges,Pg No.106 to 108
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
B

0%

RCC M 30 Beams up to 7.32m Height


Cost of M- 30 grade mix
Centering charges ,Pg No.106 to 108
Labour charges,Pg No.106 to 108
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
79

0%

Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charges f
operational charges as directed by the Engineer in Charge..
337269598.xlsx - data-WS & Sewer (2)

Page 1959 of 3205

Weight of C.I. heavy weight manhole frame and cover 90 Kg each( 2


x 90 ) = 180 Kg- rate as per CI specials vide This data book

1 Kg

Total
Overheads & Contractors Profit

14%
Total

VAT & labour cess


Cost of Man hole frame in Kg
80

0%

Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and ho
per aprooved drawing and as directed by the departmental officers and painting both sides with anti corrosive pa
primary coat including cost of all materials fabrication, welding transportation to site, all taxex and duties, fixing in
(1:1.5:3) prop., and all other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 4.42 kg/Rmt =

61.05 kg

total

61.05 kg

Cost of MS channels ( Rate of steel as per ENC-(PH),memo )

61.05 kg

fabrication charges, Item-BMM-V.14-934


add Labour allowence on fabrication
Hoisting and fixng in position
Painting with synthetic enamel paint aera = 17 x 0.2
Rate for 4.00 Rmt
VAT & labour cess

61.05 kg
20%
2.90 sqm
0%

for 1.00 Rmt


Rate per 1.00 Rmt
Rate per 1.00 Kg
81

Supplying and fixing of C.I. Single/ Double Socket soil pipes ISI marked conforming to IS:1729-1979 of reputed m
and fixing as per site requirements including painting black with Japan paint and fixing with in cement mortar (1
clamps if necessary with required no.of Bombay nails etc., complete including earth work excavation and refillin
(item65,Pg.72 of BSSR)
6" dia (152.4mm) Double Socket (BMW-C.06-Sn.91, Pg,... of the
2013-14 B.SSR Earth work excavation (1.00x0.45x0.45 =0.2025 Cum )

1 Rmt
0.2025 Cum

Rate per 15.00 Rmt


Rate per 1 Rmt
Overheads & Contractors Profit
VAT & labour cess

0%
Rate per 1 Rmt

82

Supply, delivery and fixing of 110mm dia PVC vent pipe including vent cowl, cost of material and labour charges e
septic tank for 15m height above GL
Cost of 110mm dia PVC Pipe.of 3.00 Mts length B.SSR 2013-14sani. Item No.347,Pg-99 - BMW-G.13
Rate for 15 Rmt PVC pipe
Rate for vent cowl SSR item 434,Pg-102 - BMW-G.100
PVC Pipe clip SSR item 440 Pg-102 - BMW-G.106
Labour charges for laying, fixing and commissioning the PVC pipes
including couplers/ bends/ tees etc any diameter including fixing
necessary fittings like bends, plugs, couplers, junctions, tees, etc with
solvent jointing as per standard practice, as per item No.486 of
Pg,104-BMW-G.152

337269598.xlsx - data-WS & Sewer (2)

1 No
15 Rmt
1 No
10 No
15 Rmt

Page 1960 of 3205

Add Labour component @


Rate for 15 Rmt PVC pipe
Rate for 1 Rmt
Overheads & Contractors Profit

20%

14%

VAT & labour cess

0%
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 1961 of 3205

83

BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20 p
coarse aggregate ) using 12mm size Hard Granite Machine Crushed Graded Metal including cost and conveyan
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , layin
layers, finishing top surface to the required level, curing etc., complete for finished item of work with nomonal reinforc

Unit : 1cum
A. MATERIALS:

Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
12mm Graded Metal (C-Mat- Sn.45)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. MACHINERY

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

1 hour

C. LABOUR:

Mason 1st class (labour-Irri-Skilled .S.N.11)


Mazdoor (irri-Un skilled-Sn.3)
Total
Overheads & Contractors Profit
Total
VAT & labour cess

0.10 Nos
1.39 Nos
14%
0%
Rate per cu.m.

CC (1:2:4) for 1.50m dia, 35mm thick ring of 0.30m height


Qty of Ring = 2 x pi x r x t x h
Basic Rate per Cum.
Centering charges as per PHSSR (Pg No 28, item. No. 306- L8)
add steel @ 40 Kg/ Cum (6mm rods)
Total
VAT & labour cess

0.051 Cum
0.073 Cum
2.92 Kg
0%

Rate per each ring


b

Supply & fixing CC (1:2:4) cover 1.60m dia with nominal


reinforcement 75mm thick and hooks for lifting
Basic Rate of CC (1:2:4) pi x r^2 x Thickness
Add Centering charges
add steel @ 50 Kg/ Cum

0.15 Cum
0.20 Cum
7.50 Kg
Total

VAT & labour cess


Rate per each slab of 1.60m dia and 75mm thick
84

0%

BLD-CSTN-3-11-(28)-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20 prop (C
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of a
coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying,
finishing to required level, curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum

A. MATERIALS:
Cement-(ENC-PH.Memo.No.146/Cement&Steel / T1
20mm Graded Metal (C-Mat- Sn.49)
Sand (C-Mat-Lead statement-S.No.1)
Water (including for curing) -M-189-b. irrigation SSR
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
337269598.xlsx - data-WS & Sewer (2)

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

Page 1962 of 3205

C. LABOUR:
Mason 1st class (labour-Irri-Skilled .S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total
Overheads & Contractors Profit
Total
VAT & labour cess

0.10 Nos
1.39 Nos
14%
0%
Rate per cu.m.

Supply & fixing CC (1:2:4) cover 1.20m x 0.30 m in panels with


nominal reinforcement 100mm thick and hooks for lifting
Basic Rate of CC (1:2:4) -1.2x0.30x0.10
Add Centering charges
add steel @ 75 Kg/ Cum

0.036 Cum
0.036 Cum
2.70 Kg
Total

Rate per each slab of 1.20m x 0.3m- 0.1m thick


b

Vertical walls of plane surface


Plain walls up to 3.00m height & thickness of

200 mm

Basic rate of CC ( 1:2:4)


Centering charges for RCC vertical walls of plain surface up to 3 m
height.

1.00
5.00

Cum
Sqm

Overheads & Contractors Profit


Total
VAT & labour cess
Rate per One Cum
c

0%

Vertical walls of plane surface


Plain walls up to 3.00m height & thickness of

250 mm

Basic rate of CC ( 1:2:4)


Centering charges for RCC vertical walls of plain surface up to 3 m
height.

1.00
4.00

Cum
Sqm

Overheads & Contractors Profit


Total
VAT & labour cess
Rate per One Cum
85

0%

Supply and delivery of 6mm thick rubber packing confirming to IS including cost and conveyance, packing, farwa
including all taxes and duties but excluding VAT.
Cost as per SSR- PH Items-Pg Table.No.31-Sn.4
over heads & contractors profit
VAT & labour cess

1 Kg
0%
Rate per 1 Kg

86

Supply and delivery of MS Bolts and Nuts with double washers confirming to IS specification including cost and co
transit risk etc.complete including all taxes and duties but excluding VAT..
Cost as per SSR- PH Items-Pg Table.No.31.Sn.5
over heads & contractors profit
VAT & labour cess

1 Kg
0%
Rate per 1 Kg

337269598.xlsx - data-WS & Sewer (2)

Page 1963 of 3205

DATA - INFILTRATION GALLERY


87

Excavation of trenches for infiltration galleries, syphon lines and connecting mains in all soils under water including a
bailing out water and removal of shoring and strutting materials, after completion of pipe line work.

item No.30 of PH SSR


0.00 Mts to 1.00 Mts depth below GL
Basic Rate as per PH SSR item No. 29, Pg.7
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

out put

2.00 Mts to 5.00 Mts depth below GL


Basic Rate as per PH SSR item No. 30
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

out put

Beyond 5 m deep under water for every additional 1 m depth


over item 'c'
5.00 Mts to 6.00m
for extra depth beyond 5.00 Mts

Beyond 5 m deep under water for every additional 1 m depth


over item 'c'
6.00 Mts to 7.00m
for extra depth beyond 5.00 Mts
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

Beyond 5 m deep under water for every additional 1 m depth


over item 'c'
7.00 Mts to 8.00m
for extra depth beyond 5.00 Mts
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
337269598.xlsx - data-WS & Sewer (2)

10.00
10 Cum

0%

1.00 Mts to 2.00 Mts depth below GL


Basic Rate as per PH SSR item No. 30
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

Overheads & Contractors Profit


Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum
e

out put

10.00
10 Cum

0%
10.00
10 Cum

0%
Depth

6.00

10 Cum
1.00 Mts

0%
Depth

7.00

1 Cum
2.00 Mts

0%
Depth
1 Cum
3.00 Mts

0%

8.00

Page 1964 of 3205

Rate per 1 Cum

337269598.xlsx - data-WS & Sewer (2)

Page 1965 of 3205

Beyond 5 m deep under water for every additional 1 m depth


over item 'c'
8.00 Mts to 9.00m
for extra depth beyond 5.00 Mts
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

Depth

9.00

1 Cum
4.00 Mts

0%

Beyond 5 m deep under water for every additional 1 m depth


over item 'c'
9.00 Mts to 10.00m
for extra depth beyond 5.00 Mts
Overheads & Contractors Profit
Cost for 10 cum
Rate per cum =/10
VAT & labour cess etc,.
Rate per 1 Cum

Depth

10.00

1 Cum
5.00 Mts

0%

88

Laying and jointing perforated RCC pipes inclusive of bailing out water and jointing with cement fillets and a
infiltration gallery inclusive of bailing out water by pumping to keep the trench reasonably dry to facilitate the work
pipes and collars.

Dia of the pipe in mm


Rate as per the PH SSR item No. 30 for every
Overheads & Contractors Profit
Total
VAT & labour cess etc,.

300 mm
25 mm

0%
Rate per 1 Rmt

Dia of the pipe in mm


Rate as per the PH SSR item No. 30 for every
Overheads & Contractors Profit
Total
VAT & labour cess etc,.

600 mm
25 mm

0%
Rate per 1 Rmt

Dia of the pipe in mm


Rate as per the PH SSR item No. 30 for every
Overheads & Contractors Profit
Total
VAT & labour cess etc,.

700 mm
25 mm

0%
Rate per 1 Rmt

89

Lowering the RCC plain ended pipes carefully into the trench laying them true to alignment and gradient, jointing
including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5), hemp yarn etc., and testing including fillin
upto 500 metres excluding cost of rubber rings as per BIS No.783/85.

Dia of the pipe in mm


Rate as per the PH SSR item No. 30 for every
Overheads & Contractors Profit
Total
VAT & labour cess etc,.

300 mm
25 mm

0%
Rate per 1 Rmt

Dia of the pipe in mm


Rate as per the PH SSR item No. 31 for every
Overheads & Contractors Profit
337269598.xlsx - data-WS & Sewer (2)

600 mm
25 mm

Page 1966 of 3205

Total
VAT & labour cess etc,.

0%
Rate per 1 Rmt

Dia of the pipe in mm


Rate as per the PH SSR item No. 31 for every
Overheads & Contractors Profit
Total
VAT & labour cess etc,.

700 mm
25 mm

0%
Rate per 1 Rmt

90

RBR-FNDN-2; Collection ,Supply and filling of 40 mm metal from approved quarry to work site and stacking a
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per stand
out put

40 mm Metal Filling
a) Material
40mm size HG metal ( C-Mat - Sn. 57)

6.00

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

14%

Rate per 1 Cum

91

RBR-FNDN-2 ; Collection ,Supply and filling of 20 to 12mm metal from approved quarry to work site and stacking
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per stand
out put

20 to 12mm Metal Filling


a) Material
20 to 12mm size HG metal ( C-Mat- Sn. 47 )

6.00

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

14%

Rate per 1 Cum

92

RBR-FNDN-2: Collection ,Supply and filling of 12 to 6 mm metal from approved quarry to work site and stacking
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per stand
out put

12 to 6 mm Metal Filling
a) Material
12 to 6mm size HG metal ( C- Mat - Sn . 42 )

6.00

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

14%

Rate per 1 Cum

93

RBR-FNDN-2: Collection ,Supply and filling of Coarsed sand from approved quarry to work site and stacking a
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per stand

337269598.xlsx - data-WS & Sewer (2)

Page 1967 of 3205

out put

Coarsed sand Filling


a) Material
Coarsed sand ( C- Mat - Sn. 1)

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess etc,.
Rate per 1 Cum

337269598.xlsx - data-WS & Sewer (2)

14%

0%

6.00

Page 1968 of 3205

94

RBR-FNDN-2 : Collection ,Supply and filling of Fine sand from approved quarry to work site and stacking at
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per stand
out put

Fine sand Filling


a) Material
Fine sand ( C- Mat - Sn. 2)

6.00

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess etc,.

14%

0%

Rate per 1 Cum

95

RBR-FNDN-2 : Collection ,Supply and filling of Filter media from approved quarry to work site and stacking a
premeasurements including cost and convenyance of all material and all labour charges etc. complete as per stand
out put

Filter media Filling


a) Material
Filter media ( C- Mat - Sn. 14)

6.00

6.00 Cum

b)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Labour-Irrigation-Unskilled-Sn.3)

0.00 Nos
0.31 Nos
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess etc,.

14%

0%

Rate per 1 Cum

DATA - INTAKE WELL


96

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal m
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyan
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , layin
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and un
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.146/Cement&Steel / T1 /
Coarse aggregate 40mm graded ( as per Lead statement. Sn.35)
Fine aggregate (Sand) ( Lead statement-S.N.2 )
Water (including for curing) -M-189- SSR- irrigation items
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

1 hour

C. LABOUR:
Mason 1st class(labour-Irrigation.S.N.11)

0.10 Nos

Mazdoor (irri-Un skilled-Sn.3)

1.39 Nos

Total
c&d) Overheads & Contractors Profit

14%
Rate per cu.m.

337269598.xlsx - data-WS & Sewer (2)

Page 1969 of 3205

VAT & labour cess etc,.

0%

Rate per 1 Cum up to 3.00m initial depth below GL

337269598.xlsx - data-WS & Sewer (2)

Page 1970 of 3205

Rate for Extra Delifts


Rate per 3 to 4.00 m depth from GL
Basic Rate of CC (1:5:10)
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every 1
m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per item no.32.(b) of the PH SSR, Pg.No.8

1.00 Cum
1.00 Cum

Basic Cost

No. of
Delifts

Depth of CC (1:5:10) from Ground Level

Rate per 3 to 4.00 m depth from GL

3513.24

1.00

Rate per 4 to 5.00 m depth from GL

3513.24

2.00

Rate per 5 to 6.00 m depth from GL

3513.24

3.00

Rate per 6 to 7.00 m depth from GL

3513.24

4.00

Rate per 7 to 8.00 m depth from GL

3513.24

5.00

Rate per 8 to 9.00 m depth from GL

3513.24

6.00

Rate per 9 to 10.00 m depth from GL

3513.24

7.00

Rate per 10 to 11.00 m depth from GL

3513.24

8.00

Rate per 11 to 12.00 m depth from GL

3513.24

9.00

Rate per 12 to 13.00 m depth from GL

3513.24

10.00

Rate per 13 to 14.00 m depth from GL

3513.24

11.00

Rate per 14 to 15.00 m depth from GL

3513.24

12.00

Rate per 15 to 16.00 m depth from GL

3513.24

13.00

Rate per 16 to 17.00 m depth from GL

3513.24

14.00

Rate per 17 to 18.00 m depth from GL

3513.24

15.00

Rate per 18 to 19.00 m depth from GL

3513.24

16.00

Rate per 19 to 20.00 m depth from GL

3513.24

17.00

97

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement c
FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)

M-30 GRADE OF MIX


Material
cement (ENC-PH.Memo.146/Cement & Steel /T1
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )
Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)

337269598.xlsx - data-WS & Sewer (2)

400.00 Kg
0.800 Cum
0.400 Cum

0.133 Nos.
0.267 Nos.
4.600 Nos.

1.333 hour
1.333 hour

Page 1971 of 3205

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum

337269598.xlsx - data-WS & Sewer (2)

1.20 Kl

Page 1972 of 3205

Base slab and Haunches and Toe


R.C.C. M 30 Per Cum
Centering charges ,Pg.106 to 108 of Bld. 1.A
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00
1.00
1.00
20%

Overheads & Contractors Profit

14%

Cum
Cum
Cum

Total
VAT & labour cess etc,.

0%

Rate per 1 Cum up to 3.00m initial depth from GL

Rate for Extra Delifts


Rate per 3 to 4.00 m depth below GL
Basic Rate of RCC-M30
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every 1
m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per item no.32.(b) of the PH SSR, Pg.No.8

Depth of RCC M-30 for Base slab from Ground Level

a
b
c
d
e

Rate per 3 to 4.00 m depth from GL


Rate per 4 to 5.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 12 to 13.00 m depth from GL
Rate per 13 to 14.00 m depth from GL
Rate per 14 to 15.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 18 to 19.00 m depth from GL
Rate per 19 to 20.00 m depth from GL

f
g
h
i
j
k
l
m
n
o
p
q
98

1.00 Cum
1.00 Cum

Basic Cost

No. of
Delifts

7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16
7535.16

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00

BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content a
LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
M-30 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement & Steel / T1
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )
Labour
Mason 1st class (labour-Irrigation.S.N.11)
337269598.xlsx - data-WS & Sewer (2)

400.00 Kg
0.800 Cum
0.400 Cum

0.167 Nos.

Page 1973 of 3205

2nd Class Mason (labour-Irrigation.S.N.35)


Mazdoor (Labour-Irrigation-Unskilled-S.N.3)

0.167 Nos.
5.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

1.333 hour
1.333 hour

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum

1.20 Kl

Vertical walls of circular faces for Intake well

Circular walls up to 3.00m Height & Thickness of


M-30 GRADE OF MIX
Centering charges for RCC vertical walls of circular faces up to 3 m
height.- 31-b.5-Pg.8 of PH SSR)

450 mm
1.00
Cum
2.22
Sqm

Overheads & Contractors Profit

14%
Total

Rate per One Cum up to 3.00m height above G.L


i
b

Vertical walls of circular faces for Intake well with extra Delifts below Ground Level
Rate of 450 thick wall, 3m depth below GL
Basic Rate of 450mm thick RCC-M30 wall
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every 1
m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per item no.32.(b) of the PH SSR, Pg.No.8

1.00 Cum
1.00 Cum

Basic Cost

No. of
Delifts

Depth of RCC M-30 for Base slab from Ground Level

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 19 to 20.00 m depth from GL


Rate per 18 to 19.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 14 to 15.00 m depth from GL
Rate per 13 to 14.00 m depth from GL
Rate per 12 to 13.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 4 to 5.00 m depth from GL
Rate per 3 to 4.00 m depth from GL

ii

Vertical walls of circular faces for Intake well with extra lifts above Ground Level

Rate per up to 3 m height above GL


M-30 GRADE OF MIX
Lifting of cement concrete for RCC elevated reservoir. For every 1m
height or part thereof over the initial lift of 3 m ( item 32. a. of PH SSR
- Pg.8

337269598.xlsx - data-WS & Sewer (2)

9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40

450 mm
1.00 Cum
1.00 Cum

17.00
16.00
15.00
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
1.00

Page 1974 of 3205

Height of RCC M-30 -wall from Ground Level

a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q

Rate per 3 to 4.00 m Height from GL


Rate per 4 to 5.00 m Height from GL
Rate per 5 to 6.00 m Height from GL
Rate per 6 to 7.00 m Height from GL
Rate per 7 to 8.00 m Height from GL
Rate per 8 to 9.00 m Height from GL
Rate per 9 to 10.00 m Height from GL
Rate per 10 to 11.00 m Height from GL
Rate per 11 to 12.00 m Height from GL
Rate per 12 to 13.00 m Height from GL
Rate per 13 to 14.00 m Height from GL
Rate per 14 to 15.00 m Height from GL
Rate per 15 to 16.00 m Height from GL
Rate per 16 to 17.00 m Height from GL
Rate per 17 to 18.00 m Height from GL
Rate per 18 to 19.00 m Height from GL
Rate per 19 to 20.00 m Height from GL

i
a

Vertical walls of circular faces for Intake well

Basic Cost No. of Lifts

9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40
9554.40

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00

Circular walls up to 3.00m Height & Thickness of


M-30 GRADE OF MIX
Centering charges for RCC vertical walls of circular faces up to 3 m
height.- 31-b.5-Pg.8 of PH SSR)

250 mm
1.00
Cum
4.00
Sqm

Overheads & Contractors Profit


Rate per One Cum up to 3.00m height above G.L

14%

Vertical walls of circular faces for Intake well with extra Delifts below Ground Level

Rate of 250 thick wall, 3m depth below GL


Basic Rate of 250mm thick RCC-M30 wall
Delifting the materials for concrete below GL, for every 1 m depth beyond
the initial depth of 3 m fro GL.( as per item no.32.(b) of the PH SSR,
Pg.No.8

Depth of RCC M-30 for Base slab from Ground Level

a
b
c
d
e

Rate per 3 to 4.00 m depth from GL


Rate per 4 to 5.00 m depth from GL
Rate per 5 to 6.00 m depth from GL
Rate per 6 to 7.00 m depth from GL
Rate per 7 to 8.00 m depth from GL
Rate per 8 to 9.00 m depth from GL
Rate per 9 to 10.00 m depth from GL
Rate per 10 to 11.00 m depth from GL
Rate per 11 to 12.00 m depth from GL
Rate per 12 to 13.00 m depth from GL
Rate per 13 to 14.00 m depth from GL
Rate per 14 to 15.00 m depth from GL
Rate per 15 to 16.00 m depth from GL
Rate per 16 to 17.00 m depth from GL
Rate per 17 to 18.00 m depth from GL
Rate per 18 to 19.00 m depth from GL
Rate per 19 to 20.00 m depth from GL

f
g
h
i
j
k
l
m
n
o
p
q

337269598.xlsx - data-WS & Sewer (2)

1.00 Cum
1.00 Cum

Basic Cost

11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10

No. of
Delifts

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00

Page 1975 of 3205

ii

Vertical walls of circular faces for Intake well with extra lifts above Ground Level

Rate per up to 3 m height above GL


M-30 GRADE OF MIX
Lifting of cement concrete for RCC elevated reservoir. For every 1m
height or part thereof over the initial lift of 3 m ( item 32. a. of PH SSR
- Pg.8 )

Height of RCC M-30 -wall from Ground Level

a
b
c
d
e

Rate per 3 to 4.00 m Height from GL


Rate per 4 to 5.00 m Height from GL
Rate per 5 to 6.00 m Height from GL
Rate per 6 to 7.00 m Height from GL
Rate per 7 to 8.00 m Height from GL
Rate per 8 to 9.00 m Height from GL
Rate per 9 to 10.00 m Height from GL
Rate per 10 to 11.00 m Height from GL
Rate per 11 to 12.00 m Height from GL
Rate per 12 to 13.00 m Height from GL
Rate per 13 to 14.00 m Height from GL
Rate per 14 to 15.00 m Height from GL
Rate per 15 to 16.00 m Height from GL
Rate per 16 to 17.00 m Height from GL
Rate per 17 to 18.00 m Height from GL
Rate per 18 to 19.00 m Height from GL
Rate per 19 to 20.00 m Height from GL

f
g
h
i
j
k
l
m
n
o
p
q
99

250 mm
1.00 Cum
1.00 Cum

Basic Cost No. of Lifts

11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10
11539.10

1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00

BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WE
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content
suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing et
of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

M-30 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement & Steel /T1)

400.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.067 No
0.133 No
3.077 No

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

0.308 hour
0.308 hour

Water (including for curing) -M-189- SSR- irrigation items

1.200 Kl

BASIC COST per 1 cum


337269598.xlsx - data-WS & Sewer (2)

Page 1976 of 3205

RCC M 30 Slabs up to 3.66 Mts height

RCC M 30 Slabs up to 3.66m Height & Thickness of

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
6.670 Sqm
6.670 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
b

0%

200 mm
1.00 Cum
5.000 Sqmt.
5.000 Sqm
20%

RCC M 30 Slabs up to 3.66m Height & Thickness of

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


B

RCC M 30 Slabs up to 7.32Mts height

RCC M 30 Slabs up to 7.32m Height & Thickness of

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
6.670 Sqm
6.670 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

337269598.xlsx - data-WS & Sewer (2)

Page 1977 of 3205

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items

200 mm
1.00 Cum
5.000 Sqmt.

Labour charges,Pg No. 106 to 108 of Bld. Items


Add Labour component @

5.000 Sqm
20%

RCC M 30 Slabs up to 7.32m Height & Thickness of

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


C

RCC M 30 Slabs up to 10 Mts height (Ovserved data)

RCC M 30 Slabs up to 10.00 m Height & Thickness of

Rate per One Cum for 7.32m height


Add for extra height at 16.666% on every 0.610m height above
7.32m
Add 73% on Centering Charges i.e
Add 73% on Labour Charges i.e
Rate per One Cum
Rate per One Cum for 10.00m height
d

Rate per One Cum for 7.32m height


Add for extra height at 16.666% on every 0.610m height above
7.32m
Add 73% on Centering Charges i.e
Add 73% on Labour Charges i.e
Rate per One Cum for 10.00m height
Rate per One Cum for 10.00m height
RCC M 30 Slabs up to 15.00 Mts height

RCC M 30 Slabs up to 15.00m Height & Thickness of

2728.03
1607.47
0%

RCC M 30 Slabs up to 10.00 m Height & Thickness of

150 mm
1.00 Cum
4.393 16.67%

200 mm
1.00 Cum
4.393 16.67%
2728.03
1607.47
0%

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No...,31.a (ELSR ) up to 15m

1.000 Cum
6.670 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


b

200 mm

RCC M 30 Slabs up to 15.00m Height & Thickness of

Cost of M- 30 grade mix


Centering charges ,Pg No..,31.a (ELSR )

1.00 Cum
5.000 Sqmt.

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

337269598.xlsx - data-WS & Sewer (2)

Page 1978 of 3205

DATA FOR FOOT BRIDGES

100 BLD-CSTN-3-14-(31)-A: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement c
FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)
M-20 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement &Steel / T1)
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )

350.00 Kg
0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items
BASIC COST per 1 cum
a

0.133 Nos.
0.267 Nos.
4.600 Nos.

1.333 hour
1.333 hour
1.20 Kl

for Footings
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00
1.00
1.00
20%

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

Cum
Cum
Cum

0%

Rate per 1 Cum


b

Pedastals
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%

VAT & labour cess etc,.


Rate per One Cum
c

0%

Plinth beams
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


337269598.xlsx - data-WS & Sewer (2)

14%

Page 1979 of 3205

VAT & labour cess etc,.

0%
Total

Rate per One Cum

101 BLD-CSTN-3-14-(31)-B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content a
LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS
M-20 GRADE OF MIX
Mateial
cement(ENC-PH.Memo.No.146/Cement & Steel / T1)

350.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.167 Nos.
0.167 Nos.
5.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items

1.333 hour
1.333 hour
1.20 Kl

BASIC COST per 1 cum


a

Columns up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Material charges for Centering & Scaffolding, Pg No. 106 to 108 of
Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 106 to 108 of
Bld. Items
Add Labour component @
Basic Cost
Overheads & Contractors Profit
VAT & labour cess etc,.

1.00 Cum
1.00 Cum
1.00 Cum
20%
14%
0%

Rate per One Cum


b

Columns 4.00m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e
VAT & labour cess etc,.

341.00
1603.00
0%

Rate per One Cum for 4.00m height


c

1.00 Cum
0.557 16.67%

Columns 5.00m unsupported height above GL


337269598.xlsx - data-WS & Sewer (2)

Page 1980 of 3205

Rate per One Cum for 3.66m height


Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.366 on Centering Charges i.e
Add 0.366 on Centering Charges i.e
VAT & labour cess etc,.
Rate per One Cum for 5.00m height

337269598.xlsx - data-WS & Sewer (2)

1.00 Cum
2.197 16.67%
341.00
1603.00
0%

Page 1981 of 3205

Columns 7.32m unsupported height above GL


Rate per One Cum for 3.66m height
Material charges for Centering & Scaffolding, Pg No. 106 to 108 of
Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 106 to 108 of
Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum

20%

Overheads & Contractors Profit

14%

1.00 Cum

VAT & labour cess etc,.

0%

Rate per One Cum for 7.32m height


e

Columns 10.00 m unsupported height above GL (Ob.data)


Rate per One Cum for 7.32m height
Add for extra height at 16.666% on every 0.610m height above
7.32m
Add 0.732 on Centering Charges i.e
Add 0.732 on Centering Charges i.e

1.00 Cum
4.393 16.67%
615.00
2537.00

Add Labour component @

20%

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%

Rate per One Cum for 10.00m height


f

Columns up to 15.00 m.

0.23

R.C.C. M 20 Per Cum

0.45

1.00 Cum

Centering charges ,Pg No.340 of Bld.SSR for ELSRs

13.14 Sqm
Basic Cost

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%

Rate per One Cum

Rate for extra Heights


g

Columns from 15.00 m. to 18.00m

0.23

R.C.C. M 20 Per Cum

0.45

1.00 Cum

Centering charges ,Pg No.340 of Bld.SSR for ELSRs

13.14 sqm

Add for extra height

9.0%
Basic Cost

Overheads & Contractors Profit @ 14%

14.00%

VAT & labour cess etc,.


Rate per One Cum
h

0%

Lintels up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


337269598.xlsx - data-WS & Sewer (2)

14%

Page 1982 of 3205

VAT & labour cess etc,.

0%
Total

Rate per One Cum

337269598.xlsx - data-WS & Sewer (2)

Page 1983 of 3205

Lintels up to 7.32 Mts unsupported height above GL


M-20 GRADE OF MIX
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%
Total

Rate per One Cum

102 BLD-CSTN-3-14-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content
suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing et
of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS

M-20 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
20mm HBG graded metal (Lead statement-S.N.47)
Sand ( Lead statement-S.N.2 )

350.00 Kg
0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items

0.067 No
0.133 No
3.077 No

0.308 hour
0.308 hour
1.200 Kl

BASIC COST per 1 cum


I
A

RCC Slabs for Pump Room


RCC M 20 Slabs of 125mm thick

RCC M 20 Slabs up to 3.66m Height & Thickness of

125 mm
1.000 Cum
8.000 Sqm
8.000 Sqm
20%

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum for 3.66m height


b

RCC M 20 Slabs at 4.00 Mts height & Thickness of

Rate for 4.00m Height


Rate per One Cum for 3.66m height
337269598.xlsx - data-WS & Sewer (2)

125 mm

Page 1984 of 3205

Add for extra height at 16.666% on every 0.610m height above


3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.
Rate per One Cum for 4.00m height

337269598.xlsx - data-WS & Sewer (2)

0.56
227.00
152.00
0%

16.67%

Page 1985 of 3205

125 mm

RCC M 20 Slabs at 5.00 Mts height & Thickness of

Rate for 5.00m Height


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.367 on Centering Charges i.e
Add 0.367 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.

2.20

16.67%

227.00
152.00
0%

Rate per One Cum for 5.00m height


d

RCC M 20 Slabs at 6.00 Mts height


Rate for 6.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.64 on Centering Charges i.e
Add 0.64 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.

125 mm

3.84

16.67%

227.00
152.00
0%

Rate per One Cum for 6.00m height


e

125 mm
1.000 Cum
8.000 Sqm
8.000 Sqm
20%

RCC M 20 Slabs up to 7.32m Height & Thickness of

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

RCC Slabs for Pump Room


Rate per One Cum
B
a

0%

RCC M 20 Slabs of 175mm thick


175 mm
1.000 Cum
5.710 Sqm
5.710 Sqm
20%

RCC M 20 Slabs up to 3.66m Height & Thickness of

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum for 3.66m height


b

RCC M 20 Slabs at 4.00 Mts height & Thickness of

Rate for 4.00m Height


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.

175 mm

0.56

16.67%

233.00
157.00
0%

Rate per One Cum for 4.00m height


c

RCC M 20 Slabs at 5.00 Mts height & Thickness of

Rate for 5.00m Height


Rate per One Cum for 3.66m height

337269598.xlsx - data-WS & Sewer (2)

175 mm

Page 1986 of 3205

Add for extra height at 16.666% on every 0.610m height above


3.66m
Add 0.367 on Centering Charges i.e
Add 0.367 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.
Rate per One Cum for 5.00m height

337269598.xlsx - data-WS & Sewer (2)

2.20
233.00
157.00
0%

16.67%

Page 1987 of 3205

RCC M 20 Slabs at 6.00 Mts height


Rate for 5.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.64 on Centering Charges i.e
Add 0.64 on Centering Charges i.e
Sub - Total
VAT & labour cess etc,.

175 mm

3.84

16.67%

233.00
157.00
0%

Rate per One Cum for 6.00m height


e

175 mm
1.000 Cum
5.710 Sqm
5.710 Sqm
20%

RCC M 20 Slabs up to 7.32m Height & Thickness of

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
C

0%

200 mm
1.00 Cum
5.000 Sqmt.
5.000 Sqm
20%

RCC M 20 Slabs up to 7.32m Height & Thickness of

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


D

RCC M 20 Slabs up to 15.00 Mts height

RCC M 20 Slabs up to 15.00m Height & Thickness of

300 mm
1.000 Cum
3.330 Sqm

Cost of M- 20 grade mix


Centering charges ,Pg No.7 -31.a (ELSR ) up to 15m
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


b

RCC M 20 Slabs at 18.00m Height & Thickness of


Cost of M- 20 grade mix
Centering charges ,Pg No.240,31.a (ELSR ) up to 15m
Centering charges ,Pg No.7 -31.a- 15m to 18m

300 mm
1.000 Cum
3.330 Sqm
9%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs at 20.00m Height & Thickness of

300 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m
Centering charges ,Pg No.7- 31.a- 18m to 21m
337269598.xlsx - data-WS & Sewer (2)

1.000 Cum
3.330 Sqm
15%

Page 1988 of 3205

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum

337269598.xlsx - data-WS & Sewer (2)

Page 1989 of 3205

RCC M 20 Slabs up to 15.00 Mts height

RCC M 20 Slabs up to 15.00m Height & Thickness of

120 mm
1.000 Cum
8.330 Sqm

Cost of M- 20 grade mix


Centering charges ,Pg No.7- 31.a (ELSR ) up to 15m
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs at 18.00m Height & Thickness of

120 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

1.000 Cum
8.330 Sqm

Centering charges ,Pg No.7 - ,31.a- 15m to 18m

9%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum

0%

RCC M 20 Slabs at 20.00m Height & Thickness of

120 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m
Centering charges ,Pg No.7 -31.a- 18m to 21m

1.000 Cum
8.330 Sqm
15%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
F

0%

175 mm
1.000 Cum
5.710 Sqm

RCC M 20 Slabs up to 15.00m Height & Thickness of

Cost of M- 20 grade mix


Centering charges ,Pg No.7- 31.a (ELSR ) up to 15m
Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
II
a

0%

RCC Dome Slab


RCC M 20 Dome Slab up to 3.66m Height
Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
b

0%

RCC M 20 Dome Slab up to 7.32m Height


Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

337269598.xlsx - data-WS & Sewer (2)

1.00 Cum
1.00 Cum
1.00 Cum
20%

Page 1990 of 3205

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum

337269598.xlsx - data-WS & Sewer (2)

Page 1991 of 3205

III
a

RCC Beams
RCC M 20 Beams up to 3.66m Height
Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.

0%

Rate per One Cum


b

RCC M 20 Beams up to 4.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.093 on Centering Charges i.e
Add 0.093 on Centering Charges i.e
VAT & labour cess etc,.
Rate per One Cum for 4.00m height

RCC M 20 Beams up to 5.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.367 on Centering Charges i.e
Add 0.367 on Centering Charges i.e

2002.00
1344.00

2.20

16.67%

2002.00
1344.00
0%

RCC M 20 Beams up to 6.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above
3.66m
Add 0.64 on Centering Charges i.e
Add 0.64 on Centering Charges i.e
VAT & labour cess etc,.
Rate per One Cum for 6.00m height

16.67%

0%

VAT & labour cess etc,.


Rate per One Cum for 5.00m height
d

0.56

3.84

16.67%

2002.00
1344.00
0%

RCC M 20 Beams up to 7.32m Height


Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
1.000 Cum
1.000 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess etc,.


Rate per One Cum
f

0%

RCC M 20- Beams up to 10.00 m Height (ob. Data)

Rate per One Cum for 7.32 m height


Add for extra height at 16.666% on every 0.610m height above
7.32m
337269598.xlsx - data-WS & Sewer (2)

1.000 Cum
4.39 16.67%

Page 1992 of 3205

Add 0.732 on Centering Charges i.e


Add 0.732 on Centering Charges i.e

3607.00
2127.00
0%

Rate per One Cum

337269598.xlsx - data-WS & Sewer (2)

Page 1993 of 3205

RCC M 20 Beams up to 12.50 m Height


Rate per One Cum for 7.32 m height
Add for extra height at 16.666% on every 0.610m height above
7.32m
Add 1.415 on Centering Charges i.e
Add 1.415 on Centering Charges i.e

1.000 Cum
8.49 16.67%
3607.00
2127.00
0%

Rate per One Cum


h

0.23

RCC M 20 Beams at 15m Height


Cost of M- 20 grade mix

0.45

1.00 Cum

Centering charges for Columns and Beams ,Pg No.7-31.a (7) for
ELSRs- PH SSR

13.14 sqm

Basic Cost
Overheads & Contractors Profit @ 14%

14.00%

VAT & labour cess etc,.


Rate per One Cum
i

0%

RCC M 20 Beams from 15.00 m. to 18.00m

0.23

Rate per One Cum

0.45

1.00 Cum

Centering charges for Columns and Beams ,Pg No.7-31.a (7) for
ELSRs- PH SSR

13.14 sqm

Add for extra height

9.0%
Basic Cost

Overheads & Contractors Profit @ 14%

14.00%

VAT & labour cess etc,.


Rate per One Cum

0%

IV

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end

RCC M20 for Sun shades up to 3.66m Height


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%

VAT & labour cess etc,.

0%
Total

Rate per One Sqm


b

RCC M20 for Sun shades up to 7.32m Height


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%

RCC M 20 Beams up to 12.50 m Height

0%
Total

Rate per One Sqm


337269598.xlsx - data-WS & Sewer (2)

Page 1994 of 3205

337269598.xlsx - data-WS & Sewer (2)

Page 1995 of 3205

103 BLD-CSTN-8-11-(86): RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforce
in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charge
materials, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffold
etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop) BMT-F.28- Sn-156Pg.No... of Bld.SSR.
Cement Mortar 1:3 for 25 mm thick (Mortars-" d ")
Dry Cement for making Lumps
12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides Excluding HYSD
Steel/ Mild steel & Binding wire
B) LABOUR CHARGES
Mason 1st class (labour-Irrigation.S.N.11)
Miller Operator (labour-Irrigation.S.N.16)
Mazdoor (irri-Un skilled-Sn.3)
c) Machinery
Machine Mixing Mortar with Miller - (Hire charges -Irrigation-S.No.16)

13.30 sqm
0.25 cum
50.00 kg
21.80 sqm

8.00 day
1.00 day
10.00 day
2.00 Hrs

Total
over heads & contractors profit
Grand Total for 10 Sqm
Rate per 1 sqm
VAT & labour cess etc,.

14%

0%
Rate per 1 Sqm

104 BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) using Sulphate Resistant Cementm finis
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all
charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 90
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ")
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (irri-Un skilled-Sn.3)
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & labour cess etc,.
Rate per 10 Sqm
Rate for other Floors

1F

Basic rate per 1Cum

1398.74 1398.74

Material Hire Charges for Scaffolding (Pg.No.108-Bld.SSR)

0.150 Cum
0.600 Nos
0.960 Nos
14%
0%
2F
9.90

9.90

Labour Charges for Scaffolding (Pg.No.108-Bld.SSR)

58.70

83.00

Add extra over Labour component

11.74

16.60

For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total

29.35
1479.08

337269598.xlsx - data-WS & Sewer (2)

1537.59

Page 1996 of 3205

105 BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat o
dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seign
including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting groo
complete for finished item of work of uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
Sand ( Lead statement-S.N.3 )
Top Coat in CM(1:4), 4 mm thick
cement (ENC-PH.Memo.No.146/Cement &Steel /T1)
Sand ( Lead statement-S.N.3 )
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Total
C.Overheads & Contractors Profit

43.00 Kg
0.18 Cum
14.50 Kg
0.04 Cum
0.63 day
1.47 day
3.90 day
14%

VAT & labour cess etc,.


Rate per 10 Sqm

0%

Rate for other Floors

1F

Basic rate per 1Cum

2995.64

2995.64

9.90

9.90

Labour Charges for Scaffolding (Pg.108 of Bld.SSR)

58.70

83.00

Add extra over Labour component

11.74

16.60

Material Hire Charges for Scaffolding (Pg.108 of Bld.SSR)

For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total

2F

29.35
3075.98

3134.49

106 BLD-CSTN-8-8-(83) ; Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and conv
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ")
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & labour cess etc,.
Rate per 10 Sqm
Rate for other Floors

1F

Basic rate per 1Cum


Material Hire Charges for Scaffolding (Pg.108 of Bld.SSR)

1498.93
9.90

1498.93
9.90

58.70
11.74

58.70
11.74
29.35

1579.27

1608.62

Labour Charges for Scaffolding (Pg.108 of Bld.SSR)


Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total

337269598.xlsx - data-WS & Sewer (2)

0.21 Cum
0.94 Nos
0.16 Nos
14%
0%
2F

Page 1997 of 3205

107 Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charges f
operational charges as directed by the Engineer in Charge..
Weight of C.I. heavy weight manhole frame and cover 90 Kg each( 2
1 Kg
x 90 ) = 180 Kg- rate as per CI specials vide This data book
Total
Cost of Man hole frame in Kg

108 IRR-DAW-2-12: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 2
concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machine
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete f
consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm
approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top edges of k
rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with ini
( Cement content : 300 kg / cum with use of super plasticiser(0.4% by wt. of cement, CA : 0.80 cum, Blending Ratio o

Unit
A. MATERIALS:
Cement mix
Cenent for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm ( C-Mat-Sn.47)
Coarse aggregate 10-4.75 mm ( C-Mat-Sn.58)
Fine aggregate ( screened ) ( C-Mat-Sn.3)
Super plasticiser - (Irri. SSR. Sn.70, Pg. 14)
Use rate of shuttering (rate as per Sub- data)
Scaffolding of shuttering @
Sundries
B. MACHINERY:
Concrete mixer 300 / 200 ltr ( ele
Needle vibrator 40 mm ( ele )
10 hp pump ( ele )
C. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
work inspector ( Labour - irrigation- Sn. 10 )
mazdoor ( Labour - Irrigation- Un skilled Sn.3)
for batching cement ( cement handling )
for batching other materials
for loading mortar pans
for laying & packing concrete
for conveying concrete
for curing & miscellaneous
Labour for shuttering ( Rate as per Sub-data)
Labour for scaffolding @
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for cum 1854.81
VAT & labour cess etc,.
Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

36

2450 kg
35.00 kg
3.64 cum
1.96 cum
3.08 cum
9.80 kg
115.00 sqm
15%
2.00 LS

8.00 Hour
8.00 Hour
0.50 Hour

2.00 Day
1.00 Day
2.00 Day
9.00 Day
4.00 Day
2.00 Day
7.00 Day
2.00 Day
115.00 sqm
15%

14%
0%

Page 1998 of 3205

109 RBR-SPST-8: Providing fitting and fixing mild steel railing complete as per drawing and technical specifications C
2703 MORTH.
Unit = Running m
Taking output = 100 m (2 x 50 m span)
(a) Material
IS MC 100=2.806x1.05=2.946 t
MS Flats = 0.964x1.05 =1.012 t
MS bars = 0.17x1.05=0.18 t
MS bolts, nuts and washers, Sn-55, Pg.13-Irri.SSR
(b) Labour
Mate
Blacksmith ( Labour-Skilled-Irrigation-Sn.2)
Mazdoor (Unskilled)
(c) Add 5 percent of (a) for painting one shop coat with red oxide
primer and three coats of synthetic enamel paint.
(d) Add for cost of concrete for fixing vertical post in the preformed
recess @ 1 per cent of (a)
(e) Add for electricity charges, welding and drilling equipment,
electrodes and other consumables @ 1 per cent of (a)

f&g) Overheads & Contractors Profit


Cost for 100 m = (a+b+c+d+e+f+g)
Rate per m = (a+b+c+d+e+f+g)/100
VAT & labour cess etc,.

100 m
2.946 t
1.01 t
0.18 t
150.00 kg
- day
30.00 day
42.80 day
5.00%

1.00%
1.00%

14%

0%

Rate per Rmt


Note : A typical drawing for MS railing has been followed for estimate purpose. Rate may be worked out as per desig

110 Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour char
postion etc,. Complete.
1 Kg

Cost of Mild Steel, structural steel, i.e. Angles,channels and "I"


sections
Transportation of material for 20.00Km lead
Labour charges for fabrication -BMM-V.16 - Sn-936
Add Municipal allowence on labour component
Labour charges for fixing - BMM-V.17 - Sn.937
Add Municipal allowence on labour component

1 Kg
1 Kg
20%
1 Kg
20%

over heads & contractors profit

14%

VAT & labour cess etc,.


Rate per 1 Kg

0%

ulded size 23x11x7 Cm - (1:6)

111 BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mort
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materia
like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
337269598.xlsx - data-WS & Sewer (2)

48.00 Kg
512 Nos
0.20 Cum
0.24 day.
0.56 day.

Ground moulded size 23x11

Page 1999 of 3205

Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
VAT & labour cess etc,.
Grand Total
Rate per One Cum

1.89 day.
14%
0%

337269598.xlsx - data-WS & Sewer (2)

Page 2000 of 3205

Rate for other Floors

1F

Basic rate per 1Cum

4475.33

4475.33

43.17

43.17

255.04

361.00

51.01

72.20

Material Hire Charges for Scaffolding - Pg.108


Labour Charges for Scaffolding - Pg - 108
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Rate per One Cum

2F

21.59
4824.56

4973.29

112 Supply and fixing in position of Casuarina Balli Props of size - 4" to 8" dia - 20'-0" Height including fixing in requ
ground up to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
BMC-X.06 : Basic cost Sl.No 964 of Pg No.90
Add labour charges @ 20% of the balli cost
Add for Nylon ropes etc @ 5%

1 No

Rate per 1 No

113 Supply and fixing in position of Casuarina Balli Props - 3" to 4" dia - 12'-0" Height including fixing in required positi
to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
BMC-X.07 : Basic cost Sl.No 964 of Pg No.90
Add labour charges @ 20% of the balli cost
Add for Nylon ropes etc @ 5%

1 No

Rate per 1 No
114 Providind sand bags for filling in side the coffer dam
Assuming 30 bags of sand makes 1 Cum of Bund
Filling and Laying in position of Sand Bags in the stipulated places
including cost of empty cement bag, sand, thread, stiching charges
and labour charges with 14%overhead charges and contractors
profits - Irrigation SSR - under Miscellaneous Items, Sn. 2 of Pg.35

30 bags

Rate per 1 Cum


c.Overheads & Contractors Profit
VAT & labour cess etc,.
Total for 1 Cum

14%
0%

115 Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long cold twisted deformed steel Anchor rod
the hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials,
cleaning hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.
b

Unit - 10 Nos

16 mm dia

A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 1.50m length
( 10x1.5x1.58) = 23.70 Kg

23.70 Kg

Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141 Pg


No. 19 of R & B SoR

10 Nos

Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg No.
19 of R & B SoR

10 Nos

B) LABOUR CHARGES
Bar Bender ( Labour-Skilled-Irri.SSR, Sn.1)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Rate per 10 Nos
Rate per 1 Nos
VAT & Labour cess
337269598.xlsx - data-WS & Sewer (2)

0.50 day
0.50 day
1.00 day

0%

Page 2001 of 3205

Rate per Each

337269598.xlsx - data-WS & Sewer (2)

Page 2002 of 3205

116 Providing, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete w
suitable for above lift, tested to 50% over load as per IS 3832 carrying ISI mark.
1 No
3 Tonne Capacity ( Rate as per Maharastra ( MJP Elec & Mech.
CSR-2012-13 - section -4, LF 1-3 )
1 job
Erection charges
c.Overheads & Contractors Profit
VAT & Labour cess
Grand Total
Rate per Each

14%
0%

117 Supply delivery and installation of mannually cleaned Stainless Steel bars ( screening confriming to IS6280 as
clhanned with 0.6 m depth and angle of screen tto flows with c/c distance of 30mm for coarse screen and 20mm fo
and conveyance of all material installation, transportation all labour charges, including fabrication charges etc comp
in charge
Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes &
diameters - 202 Grade - BMT-F.05, Sn.133 of Bld.SSR

1 Kg

Labour charges for Fabrication of stainless steel railing works using


stainless steel welding rods- BMM-V.18 - Sn.938 of Bld. SSR

1 Kg

Add Municipal allowence on labour component


Labour charges for fixing Iron Doors, Iron Windows and Window
Grills in position - BMM-V.15-866

20%
1 Kg

Add Municipal allowence on labour component

20%

over heads & contractors profit

14%

VAT & Labour cess


Rate per 1 Kg

0%

118 RBR-FNDN-4 - G: Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size
mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete a
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
R.C.C. grade M 35 Design Mix using 20 mm Graded Metal (MORTH 12.8.H)
Case 1 : Using Concrete Mixer
Unit = cum
(a) Material
Cement
0.422 MT
Coarse sand ( C-mat- Sn.2)
0.45 cum
20 mm aggregate ( C-mat- Sn.55)
0.54 cum
10 mm aggregate ( C-mat- Sn.53)
0.36 cum
(b) Labour
Mate
- day
Mason (1st Class)
0.10 day
Mazdoor (Unskilled)
1.39 day
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
0.40 hour
Generator 33 KVA
0.40 hour
Total of a+b+c
(d) Formwork @ 3% on (a+b+c)
3.00%
e&f) Overheads & Contractors Profit
Cost for 1 Cum = a+b+c+d+e+f
VAT & Labour cess
337269598.xlsx - data-WS & Sewer (2)

14%
0%

Page 2003 of 3205

Rate per Cum

337269598.xlsx - data-WS & Sewer (2)

Page 2004 of 3205

119 RBR-FNDN-11: Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation
Technical Specification 1204, 1900 MORTH.
Unit = 1 MT
Taking output = 1 MT
a) Material
Structural steel in plates, angles, etc including 5 per cent wastage
Nuts & bolts ( MS- Sl No.55 of Pg 13 -irrigation items)

1.05 MT
20.00 Kg

b)
Labour
(for cutting, bending, making holes, joining, welding and erecting in
position)
Mate
Fitter ( S.N. 6 of Irrigation labour)
Blacksmith ( S.N. 2 of Irrigation labour)
Welder ( S.N. 41 of Irrigation labour)
Mazdoor (Unskilled)
Electrodes, cutting gas and other consumables @ 10 per cent of
cost of (a) above
Handling loading and unloading on (a) RBR-LUCC-5
Hire charges of Welding machine on (a) (irr-Hire-66)
Total
Overheads & Contractors Profit
Grand Total
VAT & Labour cess
Rate per MT

- day
5.50 day
5.50 day
5.50 day
17.82 day

1.05 MT
20.00 hour
14%
0%

120 RBR-FNDN-12 A-iii : Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Techni
1700 MORTH. For Well Curb
Unit = 1 cum
Taking output = 1 cum
RCC M35 Grade
Same as for 4(H) except for formwork which shall be@ 20 per cent
of the cost of concrete instead of 3.0 per cent.
Case 1 : Using Concrete Mixer /Batching plant
as per Item. No.32 rate per Cum- Basic Cost of Labour, Material &
Machinery (a+b+c)
d) formwork @ 20 per cent of the cost of concrete
Overheads & Contractors Profit
Grand Total
VAT & Labour cess

1.00 cum
20.00%
14%
0%

Rate per Rmt

121 RBR-FNDN-12 B-VIII: Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Techni
1700 MORTH. For Well Staining
Unit = 1 cum
Taking out put = 1 cum
RCC M35 Grade
Same as for 4 (H) except for formwork which shall be @ 10 per cent
of the cost of concrete instead of 3 per cent
Case 1 : Using Concrete Mixer /Batching plant
as per Item. No.32 rate per Cum- Basic Cost of Labour, Material &
Machinery (a+b+c)
d) formwork @ 20 per cent of the cost of concrete
Overheads & Contractors Profit
Grand Total
337269598.xlsx - data-WS & Sewer (2)

1.00 cum
10.00%
14%

Page 2005 of 3205

VAT & Labour cess

0%
Rate per Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 2006 of 3205

122 RBR-FNDN-12 C - iv : Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Techni
1700 MORTH. for Bottom Plug
Case 1 : Using Concrete Mixer
Unit = 1 cum - PCC Grade M35 Design Mix
Taking output = 15 cum
a) Material
Cement
6.29 MT
Coarse sand
6.75 cum
40 mm Aggregate
5.40 cum
20 mm Aggregate
5.40 cum
10 mm Aggregate
2.70 cum
Admixture -(M-180) - Pg.34 of Irri-SoR
21.60 Kg
b)
Labour
Mate
- day
Mason
1.50 day
Mazdoor (Unskilled)
20.90 day
c)
Machinery
Concrete mixer (cap. 0.40/0.28 cum)
6.00 hour
Generator 33 KVA
6.00 hour
Light Crane of 3 tonnes capacity for handling tremie pipe ( Hire-R&B 6.00 hour
Sn.34)
Add 5 per cent of cost of material and labour towards cost of forming
sump, protective bunds, chiselling and making arrangements for
under water concreting with tremie pipe.

Overheads & Contractors Profit

14%

VAT & Labour cess


cost of 15 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/15

0%

123 RBR-FNDN-12 F - iv : Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Techni
1700 MORTH. for Well Cap
Case 1 : Using Concrete Mixer
Unit = 1 cum - PCC Grade M35 Design Mix
Taking output = 15 cum
a) Material
Cement
Coarse sand
20 mm Aggregate
10 mm Aggregate
b)
Labour
Mate
Mason
Mazdoor (Unskilled)
c)
Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator 33 KVA
Formwork @ 3 per cent of (a+b+c)
d&e) Overheads & Contractors Profit

VAT & Labour cess


cost of 15 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/15

337269598.xlsx - data-WS & Sewer (2)

6.33
6.75
8.10
5.40

MT
cum
cum
cum

- day
1.50 day
20.86 day
6.00 hour
6.00 hour
3.00%
14%
0%

Page 2007 of 3205

124 RBR-FNDN-13 : A : Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all typ
clayey soil and rock as shown against each case, complete as per drawing and technical specifications 1207 MORTH
from bed level.
Note : To arrive proportionate quantities keeping the cross sectional
area & depth (22/7xd2xh) for lesser diametre wells than 6m

Unit = Running Meter.


Taking output = 1 m
Diameter of well - 6 m.
Sandy Soil
Depth below bed level upto 3.0 M
Rate of sinking = 0.50 m per hour.

a) Labour
Mate
Sinker ( skilled ) ( R&B - Labour-Skilled-Sn.13)
Sinking helper( semi-skilled ) ( Irri- Labour-S.S-Sn.4)
b)
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum
capacity and accessories.( R&B-Sn.35-d)
Consumables in sinking @10 per cent of (b)

- day
1.00 day
2.12 day
2.00 hour
10.00%

Overheads & Contractors Profit


Grand Total
VAT & Labour cess

0%
Rate per Rmt

Beyond 3m upto 10m depth


Rate of sinking = 0.33 m per hour.

a) Labour
Mate
Sinker
Sinking helper ( semi-skilled )
b)
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum
capacity and accessories.
Consumables in sinking @10 per cent of (b)
Overheads & Contractors Profit
Grand Total
VAT & Labour cess

- day
1.25 day
2.65 day
3.00 hour
10.00%

0%
Rate per Rmt

Beyond 10m upto 20m


a. Add 5 percent for every additional meter depth of sinking over the
rate of sinking for the previous meter -(RBR-FNDN-13-A-iii-a)
Rate per Rmt
Depth Range - 10 to 11.00 m
Depth Range - 11 to 12.00 m
Depth Range - 12 to 13.00 m
Depth Range - 13 to 14.00 m
Depth Range - 14 to 15.00 m
Depth Range - 15 to 16.00 m
Depth Range - 16 to 17.00 m
Depth Range - 17 to 18.00 m
Depth Range - 18 to 19.00 m
Depth Range - 19 to 20.00 m

10609.87
11140.36
11697.38
12282.25
12896.36
13541.18
14218.24
14929.15
15675.61
16459.39

337269598.xlsx - data-WS & Sewer (2)

Page 2008 of 3205

125 in accordance with RBR-FNDN-13 : A : Sinking of 5.10 m external diameter well (other than pneumatic method of sin
namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specific
sinking is reckoned from bed level.
Note : To arrive proportionate quantities keeping the cross sectional
area & depth (22/7xd2xh) for lesser diametre wells than 6m

Unit = Running Meter.


Taking output = 1 m
Diameter of well - 5.1 m.
Sandy Soil
Depth below bed level upto 3.0 M

5.10 m dia

Rate of sinking = 0.50 m per hour.

a) Labour
Mate
Sinker ( skilled )
Sinking helper ( semi-skilled )
b)
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum
capacity and accessories.
Consumables in sinking @10 per cent of (b)
Overheads & Contractors Profit
Grand Total
VAT & Labour cess

- day
0.85 day
1.80 day
1.70 hour
10.00%

0%
Rate per Rmt

Beyond 3m upto 10m depth

5.10 m dia

Rate of sinking = 0.33 m per hour.

a) Labour
Mate
Sinker
Sinking helper ( semi-skilled )
b)
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum
capacity and accessories.
Consumables in sinking @10 per cent of (b)
Overheads & Contractors Profit
Grand Total
VAT & Labour cess

- day
1.06 day
2.25 day
2.55 hour
10.00%

0%
Rate per Rmt

Beyond 10m upto 20m


a. Add 5 percent for every additional meter depth of sinking over the
rate of sinking for the previous meter -(RBR-FNDN-13-A-iii-a)
Rate per Rmt
Depth Range - 10 to 11.00 m
Depth Range - 11 to 12.00 m
Depth Range - 12 to 13.00 m
Depth Range - 13 to 14.00 m
Depth Range - 14 to 15.00 m
Depth Range - 15 to 16.00 m
Depth Range - 16 to 17.00 m
Depth Range - 17 to 18.00 m
Depth Range - 18 to 19.00 m
Depth Range - 19 to 20.00 m

9015.67
9466.45
9939.77
10436.76
10958.60
11506.53
12081.86
12685.95
13320.25
13986.26

337269598.xlsx - data-WS & Sewer (2)

Page 2009 of 3205

126 RBR-FNDN-14 : A: Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all typ
clayey soil and rock as shown against each case, complete as per drawing and technical specifications 1207 MORTH
from bed level.

Unit = Running Meter.


Taking output = 1 m
Diameter of well - 7 m.
Clayee Soil
Depth below bed level upto 3.0 M
Rate of sinking = 0.30 m per hour.
a) Labour
Mate
Sinker ( skilled )
Sinking helper ( semi-skilled )
b)
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum
capacity and accessories.
Consumables in sinking @10 per cent of (b)
Overheads & Contractors Profit
Grand Total
VAT & Labour cess

- day
1.50 day
3.18 day
4.50 hour
10.00%

0%
Rate per Rmt

Beyond 3m upto 10m depth


Rate of sinking = 0.22 m per hour.
a) Labour
Mate
Sinker
Sinking helper ( semi-skilled )
b)
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum
capacity and accessories.
Air compressor with pneumatic chisel attachment for cutting hard
clay. ( Hire- R&B- Sn.4)
Consumables in sinking @10 per cent of (b)
Overheads & Contractors Profit
Grand Total
VAT & Labour cess

- day
2.00 day
4.26 day
6.00 hour
3.25 hour
10.00%

0%
Rate per Rmt

Beyond 10m upto 20m


a. Add 5 percent for every additional meter depth of sinking over the
rate of sinking for the previous meter -(RBR-FNDN-13-A-iii-a)
Rate per Rmt
Depth Range - 10 to 11.00 m
Depth Range - 11 to 12.00 m
Depth Range - 12 to 13.00 m
Depth Range - 13 to 14.00 m
Depth Range - 14 to 15.00 m
Depth Range - 15 to 16.00 m
Depth Range - 16 to 17.00 m
Depth Range - 17 to 18.00 m
Depth Range - 18 to 19.00 m
Depth Range - 19 to 20.00 m

22184.82
23294.06
24458.76
25681.70
26965.79
28314.08
29729.78
31216.27
32777.08
34415.93

337269598.xlsx - data-WS & Sewer (2)

Page 2010 of 3205

127 RBR-FNDN-30: Driven precast vertical M 35 grade with a minimum cement content of 420 kg / cum R.C.C piles excl
diameter pile (using crane, vibrating pile driving hammer with power unit) including the cost of materials, labour an
material and machinery as per Drawing and & Technical Specification in Section 1100 & 1700 MORTH
Pile Diameter = 500 mm
Unit = Running Meter
Taking output = 60 m
a) Materials
RCC Grade M35
Rate for concrete may be adopted same as for bottom plug vide item
no. 12( F ) (IV)
b ) Material Pile shoes
a) C.I Shoes -M-080, Pg No.29 of irri.SoR
b) M.S. shoes -Yanam-PSR-2013-14, Pg.68
c) Steel helmet and cushion block on top of pile head during driving.M-173, Pg No.33
c)
Machinery
Crane 20 t capacity
Vibrating Pile driving hammer complete with power unit and
accessories.( Rate adopted from Yanam -PSR-2013-14-Code
No.0027, Sn.18, Pg.1)
d)
Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add 1 per cent of (a+b+c)
for carriage of piles from casting yard
to work site and stacking, and other imponderables during
installation.

11.78 cum

240.00 Kg
105.00 Kg
30.00 Kg

6.00 hour
6.00 hour

- day
3.12 day
1% on Rs.

14%

e&f) Overheads & Contractors Profit


Cost for 60 m = a+b+c+d+e+f
Rate per metre (a+b+c+d+e+f)/60
VAT & Labour cess

0%
Rate per Rmt

128 RBR-FNDN-39 - 39.i : Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Tech
1100, 1500 & 1700 MORTH
A. RCC Grade M20 (Design Mix)
Unit = cum
Taking output = 15 cum
Using Concrete Mixer
a) Material

Cement
Coarse sand
20 mm Aggregate
10 mm Aggregate
b)
Labour
Mate
Mason
Mazdoor (Unskilled) for concreting
Mazdoor (Unskilled) for breaking pile head, bending bars, cleaning
etc.
c)
Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator (capacity 33 KVA)
Formwork @ 4 per cent on cost of concrete i.e. cost of
Material,
b)
Labour
and c)
Machinery

a)

Sub - Total
d&e) Overheads & Contractors Profit
337269598.xlsx - data-WS & Sewer (2)

5.12
6.75
8.10
5.40

t
cum
cum
cum

- day
1.50 day
20.90 day
1.00 day

6.00 hour
6.00 hour
4%

14%

Page 2011 of 3205

VAT & Labour cess


Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15

337269598.xlsx - data-WS & Sewer (2)

0%

Page 2012 of 3205

129 RBR-FNDN-7 : Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and te
1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where the
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage

1.05 t

Binding wire
(b) Labour for cutting, bending, shifting to site, tying and placing
in position
Mate
Blacksmith
Mazdoor (Unskilled)

6.00 kg

c&d) Overheads & Contractors Profit


Rate per 1 MT( = a+b+c+d)
VAT & Labour cess

14%

- day
2.00 day
6.40 day

0%

Rate per 1 Kg

130 RBR-FNDN-10-A : Providing and Constructing Temporary Island 16 m diameter for Construction of Well Foundation
Specification 1203 MORTH.
A Assuming depth of water 1.0 m and height of island to be 1.25 m.
Unit = 1 No
Taking output = 1 No.
a) Material
Earth (compacted)
Sand bags
b)
Labour
Mate
Mazdoor for filling sand bags, stitching and placing
c)
Machinery
Crane with grab 1 cum capacity (Hire- R&B-Sn.35)
Consumables @ 2.5 per cent of (c) above

251.20 cum
750.00 each
- day
15.40 day
20.00 hour
2.50%

14%
d&e) Overheads & Contractors Profit
Rate per No. (a+b+c+d+e)
Note : It is assumed that earth will be available within the working space of crane with grab bucket.
C

RBR-FNDN-10-C:Providing and constructing one span service road to reach island location from one pier location
Tech. Specification 1203 MORTH.
Assuming span length 30 m, width of service road 10m and depth of
water 1m
Unit = 1 meter
Taking output = 30 metre
a) Material
Earth
Sand bags
b)
Labour
Mate
Mazdoor (Unskilled) for filling sand bags, stitching and placing
c)
Machinery
Front end Loader 1 cum capacity
Tipper 5.5 cum capacity
d&e) Overheads & Contractors Profit
337269598.xlsx - data-WS & Sewer (2)

450.00 cum
300.00 each
- day
6.24 day

27.00 hour
28.00 hour
14%

Page 2013 of 3205

Cost for 30 m = (a+b+c+d+e)


Rate per m = (a+b+c+d+e)/30

337269598.xlsx - data-WS & Sewer (2)

Page 2014 of 3205

131 Providing and fixing M.S.chequerred plate flooring of 6mm thickness supported on M.S.Girders including welding, cu
to the required square or rounding shape, making holes in the plate, including providing and applying 3 coats of an
as directed by Engineer-in-charge.
6mm thick M.S.chequerred plate @ 56.15 Kg/Sqm
Labour charges for fabrication -BMM-V.16 - Sn-936
add MA on LC
Labour charges for fixing - BMM-V.17 - Sn.937
add MA on LC
2 coats of coal tar epoxy paint ( Both sides)

56.15 Kg
56.15 Kg
20%
56.15 Kg
20%
2.00 Sqm
14%

Overheads & Contractors Profit


Rate per 1 Sqm

132 in accordance with IRR-PMW-3-18 : Providing two coats of painting 100 micron dry film thickness each coat to em
applied coal tar epoxy paint of approved quality including removing rust, cleaning surface, cost of all materia
lifts.complete with all leads and all lifts.
Unit
Coal tar epoxy paint - irrigation SSR-86, Pg.15
Sundries ( rust remover / brush etc ) as per Irri. data
Add for scaffolding / ladder etc @
Painter Class-II ( Labour-Irri-Semi skilled-Sn.37)
mazdoor
Cost for 100 Sqm =
Rate per Sqm = (a+b+c+d+e)/100
d&e) Overheads & Contractors Profit
Rate per 1 Sqm

100 Sqm
34.00 ltr
4.00 LS
10%
13.00 Day
6.00 Day

14%

133 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through
together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B cl
guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull ope
cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories et
work as per special spn: 1108
Rate as per SSR Item No. 156,Pg 18 -BMT-F.29
over heads & contractors profit
Sub-Total
VAT & Labour cess
Rate per 1 Sqm

1.00 Sqm
14%
0%

134 BMT-P.25: NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH
and Fixing of windows made of pre-painted steel (Base steel as per IS 513 of 0.6mm thick galvanized as per IS 277
coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back
alkyd backer. Section for outer frame should be of 48x50mm, centre mullion should be of 48x50mm, section for shut
Fixed glass beading section should be of 12x12mm. Outer frame and mullions to have rebate for Glazed shutter an
bars/Grills. The sections are to be cut to length metre joined with corner bracket. Centre mullion is to be fixed with
seccolor stay, 2 nos. of Stainless Steel heavy duty Pivot hinges shall be provided per shutter. The windows should be
float glass. Rubber Gaskets are provided all around the glass. The above frames should be fixed to the concrete/
expanding screws, Including 10mm Square guard bars with 6 (152.4mm) pitch etc., complete for finished item of wo

Double shutter Window with vertical member 40 x 40 (1219.2mm x 1219.2mm) outer frame section size of 48x50
of 47x20mm and mullion section should be of 48x50mm.
Rate as per SSR Item No. 742 Pg 62 -BMT-P.25
over heads & contractors profit

1 Sqm
14%

Sub-Total
VAT & Labour cess
Rate per 1 Sqm

0%

337269598.xlsx - data-WS & Sewer (2)

Page 2015 of 3205

Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section size of 48x50m
of 47x20mm. Mullion section size of 48x50mm. Fixed beading section size of 12x12mm.
Rate as per SSR Item No. 743 Pg 62 -BMT-P.26
over heads & contractors profit
Sub-Total
VAT & Labour cess
Rate per 1 Sqm

1 Sqm
14%
0%

135 Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars h
centre and vertically at 30cm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly
fixing and making to original surface neatly and painting grill with one coat of red oxide primer including and conve
bending, welding including all operational charges and all labour charges etc., complete for finished item of work.
For MS Grill

1.50 x

Quantity Anailysis
25mm x 6mm MS flat alround @ 1.20 Kg/Rmt
Vertical Flat
Horizontal Flat
Z Holdfasts

2 Nos
2 Nos
4 Nos

1.50
1.50
0.45

8.00 Rmt
10mm M.S square bars @ 0.78 kg /Rmt
Vertical bars
Horizontal bars

5 Nos
12 Nos

1.50
1.50

26.00 Rmt
Cost Analysis
Cost of 25X 6mm MS Flat
Cost of 10mm MS squre bars
Labour charges for fabricating steel and fixing in position as per SSR
Item No.BMM-V.14-824
Labour
charges for fixing Iron Doors, Iron Windows and Window
Grills
in Labour
positionBMM-V.15-825.Pg68
M.A on
component
@

9.60 Kgs
20.28 Kgs
29.88 Kgs
29.88 Kgs
20%

Rate per 29.88 Kgs


Rate per 1 Sqm
Rate per 1 Kg

136 BLD-CSTN-9-13-(111): Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard
laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finish
smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., c
charges, etc., complete for finished item of work.
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed)
Cement
Sand
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Total
over heads & contractors profit
Sub-Total
Add Labour Cess @

0.17 Cum
120.00 Kg
0.085 Cum
1.25 day
0.06 day
3.00 day
1.00%
14%
0%

337269598.xlsx - data-WS & Sewer (2)

Page 2016 of 3205

Rate per 10 Sqm

137 BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after thor
remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and inci
charges etc., complete for finished item of work, but excluding conveyance charges of materials
Whiting / White Cement - BMS-W.68

Gum, conjee water, or prickly pear juice including necessary fire


wood
Brick Layers / Painter
Mazdoor (unskilled)
Sundries including brushes, ladders, etc.,

1.20 Kg
LS
0.11 day
0.22 day
0.50%

over heads & contractors profit


Sub-Total
Add Labour Cess @
Rate per 10 Sqm

14%
0%
Rate per 1Sqm

337269598.xlsx - data-WS & Sewer (2)

Page 2017 of 3205

Use rate of shuttering and Scaffolding materials :


Consider one shutter and one soldier set :
Size of shutter considered : 900 mm x 1200 mm
Length of soldier for fixing shutter
4 mm thick plate 1.08 sqm @ 31.4 kg / sqm
50x50x6 mm angle 6.6 m length @ 3.8 kg / m
50x6 mm flat 1.8 m length @ 2.35 kg / m
ISLC 100 2.3 m length @ 7.9 kg / m
6 mm plate 0.03 sqm @ 47.1 kg / sqm
Cost of 4 mm plate 33.91 kg
Cost of 6.6 m angle 25.08 kg
Cost of 1.8 m flat 4.23 kg
Cost of 2.3 m soldier 18.17 kg
Cost of 6mm plate 1.41 kg

33.91 Kg
25.08 Kg
4.23 Kg
18.17 Kg
1.41 Kg

Add for wastage @


Add for bolts & nuts @ 0.5 kg / sqm - M-130 - Irri
Add for fabrication of shutter (Sn.15, Pg.24) Irri

0.5 Kg
82.80 Kg

Deduct salvage value @


Use rate of shutters:
Use rate of shutters considering average
Add for repairs / replacements / catwalks etc.@
Add for binding wire / temperary supports etc.@
Add for 2 J-bolts / sqm for fixing soldier @ Rs:Sn.46, Pg.13
Add for shutter oil at 0.2 ltr / sqm Rs: Sn. 14, Pg.23

2 Nos
0.2 ltr

Effective area of shutter & soldier


( allowing 10 cm margin at top / bottom )
Use rate of shuttering for concrete / use / sqm for 40 uses
( Excluding T & P / Profit / Overheads)
Erection and dismantling shuttering / scaffolding :
2 Fitters, 1 Carpentor Cl-II & 5 mazdoors erect 50 sqm shuttering &
scaffolding / day.

100.00

Cost of dismantling assumed at 50 % of erection charges.


Area of shuttering with scaffolding / supports considered.
Cleaning, conveying, erection and oiling:
Fitter shuttering ( Labour-Irri-Skilled-Sn.40)
Carpentor Cl -II ( Labour-Irri-II-Sn.40)
mazdoor
Dismantling and stacking:
Fitter shuttering 2 Nos.
Carpentor Cl -II 1 Nos.
mazdoor 5 Nos.
Labour charges for shuttering / scaffolding per sqm
( Excluding T & P / Profit / Overheads / Hidden costs )

337269598.xlsx - data-WS & Sewer (2)

4 Nos
2 Nos
10 Nos
2 Nos
1 Nos
2 Nos

Page 2018 of 3205

Data for Summer Storage Tank & Waste Water Treatment Plant works

138 IRR-CAW-1-1: Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of em
water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, lab
neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upt

Description

Quantity
Unit

A. MATERIALS:
Nil
B. MACHINERY:
Shovel 0.85 cum capacity ( S.N.53 - Hire-Irrigation)
Tippers 5 cum capacity 6 Nos ( S.N.55 - Hire-Irrigation)
Total hire charges of Machinery
C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation)
Cost of Labour
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 925 Cum
Rate per 1 Cum

925

8.00 Hour
48.00 Hour

1.00 Day
30.00 Day

139 IRR-CAW-1-2: Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of em
water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, lab
neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upto
Unit
A. MATERIALS:
Nil
B. MACHINERY:
Shovel 0.50 cum capacity ( S.N.52 - Hire-Irrigation)
Total hire charges of Machinery
C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation)
Cost of Labour
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 440 Cum
Rate per 1 Cum

440

8.00 Hour

1.00 Day
17.00 Day

140 IRR-CAW-4-1: Providing impervious hearting embankment with soil collected in embankment area in heaps as pa
from canal including cost of all materials,machinery, labour, all operations such as sortingout, spreading in layer
breaking clods,sectioning, watering and compacting each layer to density control of not less than 98 percent or as s
foot roller etc., complete with lead upto 1 km for water.
Unit
A. MATERIALS:
Seioniorage charges for soil
B. MACHINERY:
Angle dozer 90 hp ( S.N.8 - Hire-Irrigation)
Pump 5 hp ( diesel ) ( S.N.27 - Hire-Irrigation)
Water tanker 8000 ltr ( S.N.65 - Hire-Irrigation)
Vibratory pad foot roller 8 tonne ( S.N.63 - Hire-Irrigation)
Sundries
Total hire charges of Machinery
337269598.xlsx - data-WS & Sewer (2)

600.00 Cum
3.60 Hour
3.00 Hour
5.00 Hour
7.30 Hour

600

Page 2019 of 3205

C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation)
Cost of Labour
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 600 Cum
Rate per 1 Cum

337269598.xlsx - data-WS & Sewer (2)

1.00 Day
4.00 Day

Page 2020 of 3205

141 IRR-CAW-7-1: Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area in
of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 98 perce
required profile etc., complete with initial lead upto 1 km and all lifts.
Unit
A. MATERIALS:
Seioniorage charges for soil
B. MACHINERY:
Shovel 0.50 cum capacity ( S.N.52 - Hire-Irrigation)
Angle dozer 90 hp ( S.N.8 - Hire-Irrigation)
Tippers 5 cum capacity 6 Nos ( S.N.55 - Hire-Irrigation)
Pump 5 hp ( diesel ) ( S.N.27 - Hire-Irrigation)
Water tanker 8000 ltr ( S.N.65 - Hire-Irrigation)
Diesel road roller 8-10 tonne ( S.N.51 - Hire-Irrigation)
Sundries
Total hire charges of Machinery
C. LABOUR:
work inspector (S.No.10 - Labour- Skilled - irrigation)
mazdoor (S.No.3 - Labour- Un Skilled - irrigation)
Cost of Labour
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 394 Cum
Rate per 1 Cum

394

394.00 Cum
8.00 Hour
3.00 Hour
24.00 Hour
4.00 Hour
4.00 Hour
11.50 Hour

2.00 Day
38.00 Day

142 IRR-CAW-7-32: Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, lay
all leads and lifts. Using 1000 micron thick LDPE sheet.including providing average 75 mm thick unscreened sand ba
Unit
A. MATERIALS:
LDPE sheet 1000 micron thick ,Sl.No-54, Pg-13 of the SSR (201415) - Irrigation
Bitumen 85 / 25 and 80 / 100 Gr ( HPCL rate)
Sand unscreened ( S.No.1 of C-mat)
Total cost of Materials
B. MACHINERY:
Total hire charges of Machinery
C. LABOUR:
Joining & laying @ 10 % of sheet cost
mazdoor for Sand Filling (S.No.3 - Labour- Un Skilled - irrigation)
mazdoor for Sheeting (S.No.3 - Labour- US - irrigation)
Cost of Labour
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 250 Sqm
Rate per 1 Sqm

337269598.xlsx - data-WS & Sewer (2)

275.00 Sqm
4.00 Kg
18.75 Cum

6.00 Day
1.00 Day

250

Page 2021 of 3205

143 IRR-CAW-7-30: Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, lay
all leads and lifts. Using 500 micron thick LDPE sheet.including providing average 75 mm thick unscreened sand bac
Unit
A. MATERIALS:
LDPE sheet 500 micron thick ,Sl.No-52, Pg-13 of the SSR (2014-15)
Bitumen 85 / 25 and 80 / 100 Gr (HPCL Rate)
Sand unscreened ( S.No.1 of C-mat)
Total cost of Materials
B. MACHINERY:
Total hire charges of Machinery
C. LABOUR:
Joining & laying @ 10 % of sheet cost
mazdoor for Sand Filling (S.No.3 - Labour- Un Skilled - irrigation)
mazdoor for Sheeting (S.No.3 - Labour- US - irrigation)
Cost of Labour
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 250 Sqm
Add VAT & LC @

250

275.00 Sqm
4.00 Kg
18.75 Cum

6.00 Day
1.00 Day

0%

Rate per 1 Sqm

144 IRR-CAW-7-8 : Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than
concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder ty
cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction
strips, curing, shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all

Cement 43 Gr ( CE-PH-Memo)
Coarse aggregate 20-10 mm (S.No.52 of C-Mat)
Coarse aggregate 10 to 4.75 mm (S.No.51 of C-Mat)
Fine aggregate (Screened) (S.No.3 of C-Mat)
Super plasticiser -(S.n.70- Pg-14 - Irrigation SSR)
PVC sealing strip , (Sl No.59, Pg 13 - irrigation SSR)
Use rate of paving cylinder (as per Irrigation data )
Total cost of Materials
Batching plant ( S.N.9 - Hire-Irrigation)
Transit mixer 3 Nos ( S.N.33 - Hire-R&B -2013-14)
Mechanical paver ( S.N.24 - Hire-R&B -2013-14)
DG set for batching plant 50 KVA ( S.N.25 - Hire-Irrigation)

Unit
26400.00 Kg
45.76 cum
24.64 cum
39.60 cum
105.60 kg
533.00 Rm
800.00 sqm
8.00 Hour
24.00 Hour
8.00 Hour
8.00 Hour

DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation)


Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation)
Water tanker ( S.N.65 - Hire-Irrigation)
Pump 5 hp (diesel) 2 Nos. 4 hrs each ( S.N.27 - Hire-Irrigation)

8.00 Hour
2.00 Hour
8.00 Hour
8.00 Hour

Total hire charges of Machinery


Mason Class I (S.No.11 - Labour- Skilled - irrigation)
Mechanic (S.No.12 - Labour- Skilled - irrigation)
Fitter (S.No.6 - Labour- Skilled - irrigation)
Electrician (S.No.5 - Labour- Skilled - irrigation)
work inspector (S.No.10 - Labour- Skilled - irrigation)
mazdoor ( BP site ) (S.No.3 - Labour- US - irrigation)

2.00 Day
1.00 Day
1.00 Day
1.00 Day
2.00 Day
5.00 Day

337269598.xlsx - data-WS & Sewer (2)

800

Page 2022 of 3205

mazdoor ( Paver site ) (S.No.3 - Labour- US - irrigation)


C

Total cost of Labour


Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 800 Sqm
Add VAT & LC @
Rate per 1 Sqm

337269598.xlsx - data-WS & Sewer (2)

10.00 Day

0%

Page 2023 of 3205

145 IRR-CAW-7-7: Providing and laying 80 mm thick in situ M-15 (28 days cube compressive strength not less than
concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder ty
cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction
strips, curing, shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all

Cement 43 Gr ( CE-PH-Memo)
Coarse aggregate 20-10 mm (S.No.52 of C-Mat)
Coarse aggregate 10 to 4.75 mm (S.No.51 of C-Mat)

Fine aggregate (Screened) (S.No.3 of C-Mat)


Super plasticiser -(S.n.70- Pg-14 - Irrigation SSR)
PVC sealing strip , (Sl No.59, Pg 13 - irrigation SSR)

38.02 cum
101.38 kg
640.00 Rm

Use rate of paving cylinder (as per Irrigation data )


Total cost of Materials
Batching plant ( S.N.9 - Hire-Irrigation)
Transit mixer 3 Nos ( S.N.33 - Hire-R&B -2013-14)
Mechanical paver ( S.N.24 - Hire-R&B -2013-14)
DG set for batching plant 50 KVA ( S.N.25 - Hire-Irrigation)

960.00 sqm
8.00 Hour
24.00 Hour
8.00 Hour
8.00 Hour

DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation)


Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation)
Water tanker ( S.N.65 - Hire-Irrigation)
Pump 5 hp (diesel) 2 Nos. 4 hrs each ( S.N.27 - Hire-Irrigation)

8.00 Hour
2.00 Hour
8.00 Hour
8.00 Hour

Total hire charges of Machinery


Mason Class I (S.No.11 - Labour- Skilled - irrigation)
Mechanic (S.No.12 - Labour- Skilled - irrigation)
Fitter (S.No.6 - Labour- Skilled - irrigation)
Electrician (S.No.5 - Labour- Skilled - irrigation)
work inspector (S.No.10 - Labour- Skilled - irrigation)

2.00 Day
1.00 Day
1.00 Day
1.00 Day
2.00 Day

mazdoor ( BP site ) (S.No.3 - Labour- US - irrigation)

5.00 Day

mazdoor ( Paver site ) (S.No.3 - Labour- US - irrigation)


C

Unit
25344.00 Kg
43.93 cum
23.65 cum

Total cost of Labour


Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 960 Sqm
Add VAT & LC @
Rate per 1 Sqm

337269598.xlsx - data-WS & Sewer (2)

10.00 Day

0%

960

Page 2024 of 3205

146 IRR-CAW-7-6: Providing and laying 75 mm thick in situ M-15 (28 days cube compressive strength not less than
concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder ty
cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction
strips, curing, shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all

Cement 43 Gr ( CE-PH-Memo)
Coarse aggregate 20-10 mm (S.No.52 of C-Mat)
Coarse aggregate 10 to 4.75 mm (S.No.51 of C-Mat)

Unit
23760.00 Kg
41.18 cum
22.18 cum

Fine aggregate (Screened) (S.No.3 of C-Mat)


Super plasticiser -(S.n.70- Pg-14 - Irrigation SSR)
PVC sealing strip , (Sl No.59, Pg 13 - irrigation SSR)

35.64 cum
95.04 kg
640.00 Rm

Use rate of paving cylinder (as per Irrigation data )

960.00 sqm

Total cost of Materials


Batching plant ( S.N.9 - Hire-Irrigation)
Transit mixer 3 Nos ( S.N.33 - Hire-R&B -2013-14)
Mechanical paver ( S.N.24 - Hire-R&B -2013-14)
DG set for batching plant 50 KVA ( S.N.25 - Hire-Irrigation)

8.00 Hour
24.00 Hour
8.00 Hour
8.00 Hour

DG set for paver 30 KVA ( S.N.24 - Hire-Irrigation)


Shovel 0.5 cum / Loader ( S.N.52 - Hire-Irrigation)
Water tanker ( S.N.65 - Hire-Irrigation)
Pump 5 hp (diesel) 2 Nos. 4 hrs each ( S.N.27 - Hire-Irrigation)
Total hire charges of Machinery
Mason Class I (S.No.11 - Labour- Skilled - irrigation)

8.00 Hour
2.00 Hour
8.00 Hour
8.00 Hour

Mechanic (S.No.12 - Labour- Skilled - irrigation)


Fitter (S.No.6 - Labour- Skilled - irrigation)
Electrician (S.No.5 - Labour- Skilled - irrigation)
work inspector (S.No.10 - Labour- Skilled - irrigation)
mazdoor ( BP site ) (S.No.3 - Labour- US - irrigation)

1.00 Day
1.00 Day
1.00 Day
2.00 Day
5.00 Day

mazdoor ( Paver site ) (S.No.3 - Labour- US - irrigation)


Total cost of Labour
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for 960 Sqm
Add VAT & LC @

960

2.00 Day

10.00 Day

0%

Rate per 1 Sqm

147 IRR-CAW-5-4: Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source
machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete wi
lifts.

Rubble (S.No.8 of C-Mat)


Stone chips (S.No.5 of C-Mat)
Sundries
Total cost of Materials
work inspector (S.No.10 - Labour- Skilled - irrigation)
Mason Class-II (S.No.35 - Labour- S.Skilled - irrigation)
mazdoor (S.No.3 - Labour- US - irrigation)
Total cost of Labour
Total of A+B
C. Add for contractor's profit and overheads on (A+B)
337269598.xlsx - data-WS & Sewer (2)

Unit
100.00 Cum
15.00 cum
2.00
Day
1.00
7.00 Day
19.00 Day

100

Page 2025 of 3205

Total cost for 100 Cum


Add VAT & LC @

0%

Rate per 1 Cum

337269598.xlsx - data-WS & Sewer (2)

Page 2026 of 3205

148 IRR-CAW-8-14: Providing 10 cm Thick approved type gross turfing to the side slopes of canal including cost of
minimum 15 days etc.,,complete. with initial lead upto 50 m and all lifts ( WITHOUT USING SAND)

Turfing sods ( S.No.40- Pg.13 of 2014-15 SSR) irrigation


Sand unscreened ( S.No.1 of C-mat)
Total cost of Materials
Cartman with double bullock cart (S.No.80 - Labour- others(D) - R&B)
mazdoor (S.No.3 - Labour- US - irrigation)
Total cost of Labour
Total of A+B
C. Add for contractor's profit and overheads on (A+B)
Total cost for 100 Sqm
Add VAT & LC @

Unit
100.00 sqm
0.00 cum

100

Day
2.00
7.00 Day

0%

Rate per 1 Sqm

149 IRR-CAW-7-5 : Providing, fabricating and placing in position reinforcement steel bars for RCC works including c
bending, hooking, lapping, tying with 1.25 mm dia.soft annealed steel wire, welding wherever required in
machinery,labour etc., complete with initial lead upto 50 and all lifts.

Reinforcement .Steel with 5 % wastage ( CE-PH-Memo)


Binding wire 1.25 mm dia. S.No.3, Pg.11-2014-15 SSR
Sundries ( chairs / spacers etc )
Total cost of Materials
Bar bender (S.No.1 - Labour- Skilled - irrigation)
mazdoor (S.No.3 - Labour- US - irrigation)
Total cost of Labour
Total of A+B
C. Add for contractor's profit and overheads on (A+B)
Total cost for 1000 Kg
Add VAT & LC @

Unit
1050.00 kg
8.00 kg
10.00 LS

1000

6.00 Day
11.00 Day

0%

Rate per 1 Kg

150 IRR-CAW-7-34: Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for cement co
cost of all materials, labour etc., complete with all leads and lifts.
Unit
Tarfelt joint filler board 20 mm thick,Sl.No.74,Pg.14-irri
Total cost of Materials
Carpenter Cl- II (S.No.4 - Labour-SemiSkilled - irrigation)
mazdoor (S.No.3 - Labour- US - irrigation)
Total cost of Labour
Total of A+B
C. Add for contractor's profit and overheads on (A+B)
Total cost for 100 Rmt
Add VAT & LC @

100

10.00 Sqm
1.00 Day
1.00 Day

0%

Rate per 1Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 2027 of 3205

151 IRR-CAW-7-36: Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete
cost of all materials, labour etc., complete with all leads and lifts.

Asphalt 80/100 Gr, - S.No.2, Pg.11-Irrigation 2014-15


Sand ( screened ) (S.No.3 of C-Mat)
Total cost of Materials
Mason Class-II (S.No.35 - Labour- S.Skilled - irrigation)
mazdoor (S.No.3 - Labour- US - irrigation)
Total cost of Labour
Total of A+B
C. Add for contractor's profit and overheads on (A+B)

Unit
35.00 Kg
0.04 Cum

100

0.50 Day
1.00 Day

Total cost for 100 Rmt


Add VAT & LC @

0%

Rate per 1 Rmt


152 RBR-PTWK-12: (11) : Construction of toe walls for protection of slopes in PCC M -10 Grade as per drawing and
1302.5 MORD
Unit
P.C.C grade M 10 - Machine Mixed
Nominal mix 1:3:6
(a) Material
Cement (CE-PH-memo)
Coarse sand (S.No.2 of C-Mat)
40 mm aggregate (S.No.57 of C-Mat)
20 mm aggregate (S.No.55 of C-Mat)
10 mm aggregate (S.No.53 of C-Mat)
(b) Labour
Mate
Mason(1st Class) (S.No.11 - Labour- Skilled - irrigation)

0.220 t
0.45 cum
0.570 cum
0.280 cum
0.050 cum
- day
0.10 day

Mazdoor (Unskilled) (S.No.3 - Labour- US - irrigation)

1.39 day

(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted with water
measuring device and preferably also with load cell. ( S.N.17 - HireIrrigation)

0.40 hour

(d) Formwork @ 4% on cost of material, labour and machinery


(a+b+c)
e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f
Add VAT & LC @

0%

Rate per 1 Cum

153 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, cla
and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, in
charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work
Item No.20 of Pg.400, Amendment to Building standard data
-2011-12
a

up to 300 mm dia
Total cost for 1 RM
A. MATERIALS :
Nil
337269598.xlsx - data-WS & Sewer (2)

Page 2028 of 3205

B. LABOUR
Mazdoor (S.No.3 - Labour- US - irrigation)
C.Overheads & Contractors Profit

0.526 day

Add VAT & LC @

0%
Total per 1 Rmt

154 Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, cla
and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, in
charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work
Item No.20 of Pg.400, Amendment to Building standard data
-2011-12
b

up to 350 to 450 mm dia


Total cost for 1 RM
A. MATERIALS :
Nil
B. LABOUR
Mazdoor (S.No.3 - Labour- US - irrigation)
C.Overheads & Contractors Profit

0.631 day

Add VAT @

0%
Total per 1 Rmt

155 BLD-CSTN-3-14-(31) - A ; Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as p
PLINTH, PEDESTALS
A

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20 -Grade of Mix
20mm HBG graded metal

0.80 Cum

Sand

0.40 Cum

Cement

350.00 Kg

1st Class Mason

0.133 day.

2nd Class Mason

0.267 day.

Mazdoor (Both Men & Women)

4.60 day.

Weigh batcher hire charges, machine mixing charges

1.333 hour

Vibrator hire charges ( Hire - Irrigation-41)

1.333 hour

Water (including for curing) - M-189. irrigation. Pg.34


Add VAT @
Add Labour Cess @

1.20 Kl
0%
0%

BASIC COST per 1 cum


c

Plinth beams
M-20 -Grade of Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @
337269598.xlsx - data-WS & Sewer (2)

1.00 Cum
1.00 Cum
1.00 Cum
20%

Page 2029 of 3205

Sub - Total
Overheads & Contractors Profit
Sub - Total
Add VAT @
Rate per One Cum

337269598.xlsx - data-WS & Sewer (2)

14%
0%

Page 2030 of 3205

156 BLD-CSTN-3-15- ( 31 ) -B : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using W
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost a
like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, cur
cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content a
LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS.

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire ChargesIrrigation
S.No16)
Vibrator hire
charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)
Sub Total of - C
BASIC COST per 1 cum
D. Overheads & Contractors Profit
sub total
Add VAT @
Total
Rate per One Cum
a

0.80 cum
0.40 cum
380.00 Kgs

0.167 day
0.167 day
5.600 day

1.333 hour
1.333 hour
1.20 kl

14%
0%

Columns up to 3.66 Mts unsupported height above GL


RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Basic Cost

Overheads & Contractors Profit


sub total
Add VAT @
Rate per One Cum

14%
0%

157 BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level ; Plain Cement concrete nominal m
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyan
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , layin
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and un
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
1.39 day
337269598.xlsx - data-WS & Sewer (2)

Page 2031 of 3205

Sub - Total
c.Overheads & Contractors Profit
Add VAT @
Grand Total

14%
0%
Rate per One Cum

Ground moulded size 23x11x7 Cm - (1:4)

158 BLD-CSTN-5-2 (40) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mor
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materia
like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)

72.00 Kg
512 Nos
0.20 Cum
Sub Total of - A

B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.24 day.
0.56 day.
1.89 day.
Sub Total of - B

Total A+B
c.Overheads & Contractors Profit
Add VAT @
Grand Total
Rate per One Cum

14%
0%

159 BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Gra
Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seignio
labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level cu
item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:

0.10 day
1.39 day

Mason 1st class


Mazdoor (unskilled)

Sub - Total
c.Overheads & Contractors Profit
Add VAT @
Grand Total

14%
0%
Rate per One Cum

160 BLD-CSTN-8-1-(76): Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conv
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:

0.15 Cum

337269598.xlsx - data-WS & Sewer (2)

Page 2032 of 3205

Mason 1st class


Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
VAT, labour cess and variation of material cost during the execution
etc,.
Add Labour Cess @
Rate per 10 Sqm

337269598.xlsx - data-WS & Sewer (2)

0.60 day
0.96 day
14%
0%
0%

Page 2033 of 3205

161 Supply and fixing of 40 mm thick polished black Kadapa stone for Baffle wall including labour charges for lifting an
all levels:
Kadapa slab 40 mm thick and size not less than 0.457 M x 0.457 M
1.05 Sqm
(BMT-B.01) item 22 Pg.
Labour charges for lifting & fixing in position @

20%

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @

14%
0%
0%
Rate per 1 Sqm

162 Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
charges, all leads & lifts and other incidental and operational charges etc., complete.
a

Rock/CC
Page No.328 of SSR, Conveyance rates - 5.00 Km
VAT & Labour cess.

1 cum
0%
Rate per 1 Cum

Earth
Page No.124 of SSR, Conveyance rates - 5.00 Km

1 cum

VAT & Labour cess.

0%
Rate per 1 Cum

163 Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges an
etc, complete,
Basic rate (item No.26/(a)/Pg 6 of PH SSR (PH items)
Total
Overheads & Contractors Profit
VAT & Labour cess.

1 Hp.hr
14%
0%

Rate per 1HPhr

161 RBR-FNDN-4-C-ii ; Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm no
aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days c
technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Unit
R.C.C grade M 20 (Design Mix) using 20 mm Graded Metal
(MORTH)
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
(d) Formwork @ 4% on (a+b+c) e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f
337269598.xlsx - data-WS & Sewer (2)

0.35 t
0.45 cum
0.54 cum
0.36 cum
- day
0.10 day
1.39 day
0.40 hr/cum
0.40 hour

Page 2034 of 3205

Add VAT @
Add Labour Cess @
Rate per 1 Cum

0%
0%

337269598.xlsx - data-WS & Sewer (2)

Page 2035 of 3205

162 RBR-FNDN-4-C-ii : Providing concrete for plain/reinforced concrete in open foundations using 20 mm & 10mm no
aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days c
technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. ( With Form work)
Unit
R.C.C grade M 20 (Design Mix) using 20 mm Graded Metal
(MORTH)
CASE I : Using Concrete Mixer
Unit = cum
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA

0.35 t
0.45 cum
0.54 cum
0.36 cum
- day
0.10 day
1.39 day
0.40 hr/cum
0.40 hour

(d) Formwork @ 4% on (a+b+c) e&f) Overheads & Contractors Profit


Rate per cum = a+b+c+d+e+f
Add VAT @
Rate per 1 Cum

0%

163 Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER wit
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materia
(sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all mate
incidental and labour charges such as weigh batching, machine mixing, pouring concrete by tremmy, curing etc.,
steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS
approved by the department including tremmy pumping, laying concrete, curing etc. complete but excluding cost of s
for finished item of work
BORED CAST-IN-SITU UNDER REAMED PILES including Bore pile stem and under ream bulbs
ANY GRADE OF MIX AND UP TO 700 mm dia
Unit : 1cum
A. MATERIALS:
Cement
0.40 MT
20mm HBG graded metal
0.80 cum
Sand
0.40 cum
Water (including for curing)
1.20 kl
B. LABOUR:
1st Class Mason
0.10 hour
2nd Class Mason
0.20 hour
Mazdoor (Both Men & Women)
3.45 day
C. MACHINERY
Weigh Batcher Hire charges (Machine mixing) charges
1.00 day
e&f) Overheads & Contractors Profit
Add VAT @
Add Labour Cess @
Rate per 1

337269598.xlsx - data-WS & Sewer (2)

0%
0%

Page 2036 of 3205

164 Manufacture,supply and delivery of RCC Socket and Spigot Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate
including Transportation,Central Excice Duty, Sales Tax but Excluding VAT etc.complete.

P1
C1
C2
Wc
R1
S1
S2
Ws
R2

RCC NP2 S/S pipe - 300mm dia


Basic Rate of RCC NP2 S/S pipe as per Table - 3 of SSR Pg No.21
(PH-SSR )
SSR Rate of Cement / MT
Market Rate of Cement / MT
Cement required per 1 Rmt
Variation in Cement Cost ( 4100-4000)/1000*3.6
SSR Rate of MS rods / MT
Market Rate of MS rods/ MT
MS rods required per 1 Rmt
Variation in MS rods Cost ( 42500-41000)/1000*0.77
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate up to 5 Kms Lead
Rate for every additional 1 KM lead or part thereof
Cost of pipe per 1 Rmt including transport
Add over heads on pipe
Add CED @ 12.36%
Add ST @ 5%
Add VAT @
Add Labour Cess @
Cost of pipe per 1 Rmt

1 Rmt
1 MT
1 MT
10.80 Kg
1 MT
1 MT
1.57 Kg

10 Km

14%
12.50%
5.00%
0%
0%

165 Manufacture,supply and delivery of Rubber rings to suit RCC Socket and Spigot Pipes confirming to B.I.S. 53
RUBBER RING) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT etc.complete.
Rubber Ring to suit RCC NP2 S/S pipe - 300mm dia
Basic Rate of RCC NP2 S/S pipe as per Table - 5 of SSR Pg No.23
(part - IV )
Add over heads
Add CED @ 12.36%
Add ST @ 5%
Cost of Each Rubber Ring

1 No
13.62%
12.50%
5.00%

Sub Analysis : (Basic Data)

OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN :


Pumping main to Hydralic field test pressure including
transportation of Water with minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour
Fitters (2 x 3 days)
Fitters I Class
Fitters II Class
Machinery
Hire chargers for Hydralic field test pressure testing including
transportation of water @ Rs. 1200/- (1000+200) / day
Materials
Pressure guage
3/4" G.I. Pipe (20 mm) cost vide ( BMW-F.81 - BMW-F.82 )
Specials
Dummies
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22)
(T) Total Rate per 500 Mts.
(r) Rate per 1 Rmt for 450 mm dia
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r
337269598.xlsx - data-WS & Sewer (2)

3.000 day
3.000 day
3.000 days

0.050 Nos
3.000 RM
1 Ls
0.100 No.
60.000 Lts.

Page 2037 of 3205

337269598.xlsx - data-WS & Sewer (2)

Page 2038 of 3205

165 Lowering the RCC S/S pipes carefully into ready made the trenches laying them true to alignment and gradient,
testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783
300 mm dia
a) Labour
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor(water carrier)

300 mm dia

b) Material
Rubber rings conforming BIS 5382/1985-including CED & ST but
excluding Contractors profit
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

1.750
4.140
11.600
2.300

day
day
day
day

40.000

each

100.000

rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e
(g) Overheads & Contractors Profit
(h) Cost for 100 rmt (f+g)
Rate per rmt = h/100

13.62%

Rate per 1 Rmt


Total cost for 300mm dia RCC NP2 class pipe including lowering, laying and jointing/ 1 Rmt

168 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming
working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint ( Rubber Gasket D jointing) w
the pipes with out side Zinc coating. Rates are including Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 300mm dia
P1
C1
C2
Wc
R1

P2 = P1+ (R2 - R1)/ 1000 x M x 0

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) of SSR Pg No.101


(part - IV )
SSR Rate of Pig Iron / MT
Market Rate of Pig Iron / MT
Weight of Pipe per 1 Rmt
Variation in Pig Iron Cost ( 27500-27500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate for every 1 KM lead
Cost of pipe per 1 Rmt including transport
Add over heads on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt

1 Rmt
1 MT
1 MT
54.18 Kg

150 Km

13.62%
12.50%
5.00%

169 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubb
S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with companys standard packin
stacking, central excise duty but excluding VAT etc., complete.
Rubber Gasket to suit 100mm DI S/S pipe -100mm dia
Basic Rate as per Table - 24 of SSR Pg No.108 (part - IV )
Add over heads
Add CED @ 12.36%

1 No
14%
12.50%

337269598.xlsx - data-WS & Sewer (2)

Page 2039 of 3205

Add ST @ 5%
Cost of Each Rubber Ring

5%

337269598.xlsx - data-WS & Sewer (2)

Page 2040 of 3205

170 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming
working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint ( Rubber Gasket D jointing) w
the pipes with out side Zinc coating. Rates are including Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 350mm dia
P1
C1
C2
Wc
R1

P2 = P1+ (R2 - R1)/ 1000 x M x 0

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) of SSR Pg No.101


(part - IV )
SSR Rate of Pig Iron / MT
Market Rate of Pig Iron / MT
Weight of Pipe per 1 Rmt
Variation in Pig Iron Cost ( 29750-29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate for every 1 KM lead
Cost of pipe per 1 Rmt including transport
Add over heads on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt

1 Rmt
1 MT
1 MT
67.45 Kg

150 Km

14%
12.50%
5%

171 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubb
S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with companys standard packin
stacking, central excise duty but excluding VAT etc., complete.
Rubber Gasket to suit 350mm DI S/S pipe -350mm dia
Basic Rate as per Table - 24 of SSR Pg No.108 (part - IV )
Add over heads
Add CED @ 12.36%
Add ST @ 5%
Cost of Each Rubber Ring

1 No
14%
12.50%
5%

172 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming
working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint ( Rubber Gasket D jointing) w
the pipes with out side Zinc coating. Rates are including Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 400mm dia
P1
C1
C2
Wc
R1

P2 = P1+ (R2 - R1)/ 1000 x M x 0

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) of SSR Pg No.101


(part - IV )
SSR Rate of Pig Iron / MT
Market Rate of Pig Iron / MT
Weight of Pipe per 1 Rmt
Variation in Pig Iron Cost ( 29750-29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate for every 1 KM lead
Cost of pipe per 1 Rmt including transport
Add over heads on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt

1 Rmt
1 MT
1 MT
80.91 Kg

150 Km

13.62%
12.50%
5.00%

173 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubb
S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with companys standard packin
stacking, central excise duty but excluding VAT etc., complete.

337269598.xlsx - data-WS & Sewer (2)

Page 2041 of 3205

Rubber Gasket to suit 400mm DI S/S pipe


Basic Rate as per Table - 24 of SSR Pg No.108 (part - IV )
Add over heads
Add CED @ 12.36%
Add ST @ 5%
Cost of Each Rubber Ring

1 No
14%
13%
5%

174 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming
working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint ( Rubber Gasket D jointing) w
the pipes with out side Zinc coating. Rates are including Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 450mm dia
P1
C1
C2
Wc
R1

P2 = P1+ (R2 - R1)/ 1000 x M x 0

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) of SSR Pg No.101


(part - IV )
SSR Rate of Pig Iron / MT
Market Rate of Pig Iron / MT
Weight of Pipe per 1 Rmt
Variation in Pig Iron Cost ( 29750-29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate for every 1 KM lead
Cost of pipe per 1 Rmt including transport
Add over heads on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost of pipe per 1 Rmt

1 Rmt
1 MT
1 MT
96.36 Kg

150 Km

14%
12.50%
5%

175 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubb
S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with companys standard packin
stacking, central excise duty but excluding VAT etc., complete.
Rubber Gasket to suit 450mm DI S/S pipe
Basic Rate as per Table - 24 of SSR Pg No.108 (part - IV )
Add over heads
Add CED @ 12.36%
Add ST @ 5%
Cost of Each Rubber Ring

1 No
14%
12.50%
5%

176 Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming
working lengths of 4,5,5.5 & 6 meterfor classification K7/ K9 suitable for push on joint ( Rubber Gasket D jointing) w
the pipes with out side Zinc coating. Rates are including Transportationand CED and ST etc,. complete.
DI K9 S/S pipe - 500mm dia
P1
C1
C2
Wc
R1

P2 = P1+ (R2 - R1)/ 1000 x M x 0

Basic Rate of DI K9 S/S pipe as per Table - 22 (1) of SSR Pg No.101


(part - IV )
SSR Rate of Pig Iron / MT
Market Rate of Pig Iron / MT
Weight of Pipe per 1 Rmt
Variation in Pig Iron Cost ( 29750-29500)/1000*13.27
Actual Rate of Pipe per Rmt (R1+R2 )
Total lead
Rate for every 1 KM lead
Cost of pipe per 1 Rmt including transport
Add over heads on pipe
Add CED @ 12.36%
337269598.xlsx - data-WS & Sewer (2)

1 Rmt
1 MT
1 MT
112.00 Kg

150 Km

14%
12.50%

Page 2042 of 3205

Add ST @ 5%
Cost of pipe per 1 Rmt

5%

337269598.xlsx - data-WS & Sewer (2)

Page 2043 of 3205

177 Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85, supply and delivery of rubb
S/S pipes anywhere in A.P. including cost of material, loading, incidental handling with companys standard packin
stacking, central excise duty but excluding VAT etc., complete.
Rubber Gasket to suit 500mm DI S/S pipe
Basic Rate as per Table - 24 of SSR Pg No.108 (part - IV )

Add over heads


Add CED @ 12.36%
Add ST @ 5%
Cost of Each Rubber Ring
Sub Analysis
Lowering C.I. Pipes, A class and specials with s/s ends carefully into
trench and laying them true to alignment and gradient including all
sundries but excluding cost and conveyance of pipes from source of
supply. (Reference to specifications. BIS No.3114/94)
Assumtion 10 m
200 mm dia CI pipes 5m long (class A)
Weight = 2 x 257 kgs = 514 kgs = 5.14 quintal
(a) LABOUR: (including LC)
Plumber 1st class
Plumber 2nd class
Man mazdoor
(b) Cost for 10 metres
Rate per metre = b/10
Rate for 1 kg = b/514

1 No
14%
12.50%
5%

0.102 day
0.238 day
1.330 day

170 PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into tre
alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of sup
No.3114/1994)
Note : The Labour charges for cost of Lowering & Laying per 1 kg weight shall be as per sub-analysis made for 200
Details of cost for 5m
a

300 mm dia pipe


Weight of 5m length = (412+450+487)/3 = 449.67 kgs
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5

449.670 Kg
14%

Rate per 1 Rmt


b

350 mm dia pipe


Weight of 5m length =(519+563+610)/3=564
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5

564.000 Kg
14%

Rate per 1 Rmt


c

400 mm dia pipe


Weight of 5m length =(631+690+744)/3=688.33
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5

688.330 Kg
14%

Rate per 1 Rmt


337269598.xlsx - data-WS & Sewer (2)

Page 2044 of 3205

450 mm dia pipe


Weight of 5m length =(761+836+901)/3=832.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5

832.670 Kg
14%

Rate per 1 Rmt

337269598.xlsx - data-WS & Sewer (2)

Page 2045 of 3205

500 mm dia pipe


Weight of 5m length =(892+971+1049)/3=970.67
(a) Labour charges for laying
(b) Overheads & Contractors Profit
(c) Cost for 5 metres = a+b
Rate per metre = c/5

970.670 Kg
14%

Rate per 1 Rmt

Sub Analysis : (Basic Data)

OBSERVED DATA FOR TESTING OF 450 MM DIA PSC MAIN : Pumping main to Hydralic field test pressure includi
minimum lead of 500 M
(Length = 500 Mts) taking out put / 500 Mts. Unit = 1 Rmt.
Labour : ( including LC)
Fitters (2 x 3 days)
Fitters I Class ( Labour-Skilled- Irrigation-Sn.6)
Fitters II Class
Machinery
Hire chargers for Hydralic field test pressure testing including
transportation of water @ Rs. 1200/- (1000+200) / day

3.000 day
3.000 day
3.000 days

Materials
Pressure guage
0.050 Nos
3/4" G.I. Pipe (20 mm) (168-33.00)
3.000 RM
Specials
1 Ls
Dummies
0.100 No.
Diesel (2 Lts. / Hr) 30 Hrs.(item No.4 of Pg.22)
60.000 Lts.
(T) Total Rate per 500 Mts.
(r) Rate per 1 Rmt for 450 mm dia
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x r
Note : Proportionate Testing Charges may be arrived, keeping the diametre of pipe based on this analysis, for an v
Pipes.

171 PHE-JCIR-4 : Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the g
filling with water, with a water lead up to 500m and testing to required pressure, etc. complete Re
3114/1994/12888/1987
Note : Rubber Gaskets shall be added seperately.
Details of cost for 10 Joints
a

100 mm dia pipe


a) Labour
Plumber 2nd class (including 40% LC)
Man mazdoor (including 40% LC)

100 mm dia
0.500 day
1.000 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)
(d) Total = a+b+c
(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
Rate per each Joint

337269598.xlsx - data-WS & Sewer (2)

each
50.000 rm

Page 2046 of 3205

150 mm dia pipe


a) Labour
Plumber 2nd class (including 40% LC)
Man mazdoor (including 40% LC)

150 mm dia
0.500 day
1.000 day

b) Material
Rubber gasket
c) Testing
Testing of Pipelines with required pressure as per relevant IS
Specification including filling with water with a water lead upto 500 M,
including hire charges of testing equipment, labour and Materials
needed for testing (as per Sub Analysis 2 A)

each
50.000 rm

(d) Total = a+b+c


(e) Add for water charges @ 1% on Labour & Testing Charges
(f) Total = d+e+f
(g) Overheads & Contractors Profit
(h) Cost for 10 joints (f+g)
Rate per joint = h/10
Rate per each Joint

172 Centrifugally cast (spun) Ductile Iron fittings conforming to IS:9523/2000 having dimentions as per table. the rates
fittings, Zinc coated externally with inside mortar lining (with finishing as per class 13/ IS 9523/2000) ( ex-works) incl
duties etc.
Rate as per Table 24 , Page No.106 of the SSR part-IV
Add Transportation charges @ 5%
Add over heads on pipe
Add CED @ 12.36%
Add ST @ 5%
Cost per 1 Kg

337269598.xlsx - data-WS & Sewer (2)

1 Kg
5%
14%
12.36%
14.50%

Page 2047 of 3205

Data ( as per Irrigation data)


Thickness of lining
Cylinder type Mechanical paver with one side paving arrangement considered
Batchning plant shifting & re-erection considered at 10 Km interval.
Average output of mechanical paver / hour
Quantity of CC for paver / hour (100 x 0.10)
Add extra qty for curvature at Bed & side junction& lug 10%
corrected qty of concrete for 100 sqm
Rated capacity of batching plant required for 8.48 cum/hour output :
(11 x 60 / 50 / 0.7)
Deploy 20 cum per hour capacity Batching & mixing plant
4 cum capacity Transit mixers considered for conveyance CC from BP to paver side
Round trip cycle time for transit mixer:
Turning & spotting at BP
Loading CC
Conveying from BP to Paver site (average)
Turning & Spotting at Paver site
Unloading concrete at paver site
Return trip to BP ( average )
with 50 min/hour working output of transit mixer / hour
Hourly requirement of concrete for 80 Sqm/hour lining
No. of Transit mixers to match 11 cum /hr (11.00 / 3.77)
Deploy 3 Transit mixers of 4 cum capacity for conveyance of CC from BP to Paver site
Deploy 1 water tanker and 2 pumps (1 at BP site and 1 at Water source) for water requirement
at BP site and at linging site.
Deploy about 50 KVA capacity DG set with all accessories at BP site
Deploy about 30 KVA capacity DG set with all accessories at paver site
Daily progress of lining @ 100 sqm / hour
Quantity of concrete for 800 Sqm
Quantity of 20 to 10 mm CA @ 0.52 cum / cum of CC
Quantity of 10 to 4.75 mm CA @ 0.28 cum / cum of CC
Quantity of fine aggregate @ 0.45 cum/ cum of CC
Quantity of cement @ 300Kg / cum of CC
Super paistizer
PVC sealing strip
Deploy 3 mazdoor at BP site for feeding cement to cement bin / silo
Deploy 2 mazdoors at BP site for miscellaneous works
Consider 0.5 cum shovel for 2 hours for pushing CA / FA to BP stock pile area.
Consider 2 Masons, 10 mazdoors at paver site for laying & curing CC
Use rate of materials:
Cost of paving cylinder @ Rs.
28080
Life of paving cylinder in Sqm of lining
Use rate of paving cylinder / sqm
(cost / life)
Add for repair charges at 25%
Use rate of paving cylinder / sqm including repairs

337269598.xlsx - data-WS & Sewer (2)

Page 2048 of 3205

R SUPPLY AND SEWERS

Rate
Unit
Amount
including water bound macadam and stacking of excavated
656.00

10 Sqm

65.60
13.12
10.72
89.44
0.00
89.44

Rs

e trench work. as directed by the departmental officers.


1822.00

1 Cum

1822.00
364.40
297.68
2484.08
0.00
2484.08

Rs

vated materials for pipe line trench work. as directed by the


224.00

1 Cum

224.00
44.80
36.6
305.40
0.00
305.40

Rs

ual means: Earthwork excavation in all kinds of soil for Pipe


nstruction of shoring and bracing, removal of stumps and other
305 MoRD / 304 MoRTH and as directed by the departmental
ng the execution and taking all precautionary measures in the
d backfilling in trenches with excavated suitable material and
onal charges etc., complete for Pipe Line trenches by manual

d 301.2.1 of MORT&H
Cum
450.00
384.00

1 Each
1 Each

Rs

0.00
1397.76
1397.76
190.31
1048.32
2636.39
263.64
0.00
263.64
13.18
337269598.xlsx - data-WS & Sewer (2)

Page 2049 of 3205

Rs

276.82

337269598.xlsx - data-WS & Sewer (2)

Page 2050 of 3205

hanical means: Earthwork excavation in all kinds of soil for


ut, construction of shoring and bracing, removal of stumps and
tion 304 MORTH and as directed by the departmental officer
xecution and taking all precautionary measures in the restricted
n trenches with excavated suitable material and disposal of
s etc., complete for Pipe Lines by mechanical means.

Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
94.40
0.00
94.40
4.72
99.12

Rs
Rs

y Manual means: Earthwork excavation in all kinds of soil for


ut, construction of shoring and bracing, removal of stumps and
cification 305 MoRD / 304 MoRTH and as directed by the
s possible during the execution and taking all precautionary
on of traffic and backfilling in trenches with excavated suitable
idental and operational charges etc., complete for Pipe Line

d 301.2.1 of MORT&H
Cum
450.00
384.00

1 Each
1 Each

Rs
Rs

0.00
1797.12
1797.12
244.68
1347.84
3389.64
338.96
0.00
338.96
16.95
355.91

337269598.xlsx - data-WS & Sewer (2)

Page 2051 of 3205

ow GL by Mechanical means: Earthwork excavation in all


luding setting out, construction of shoring and bracing, removal
Technical Specification 304 MORTH and as directed by the
s possible during the execution and taking all precautionary
of traffic and backfilling in trenches with excavated suitable
ntal and operational charges etc., complete for Pipe Lines by

Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
107.88
0.00
107.88
5.39
113.27

Rs
Rs

nual means: Earthwork excavation in all kinds of soil for Pipe


nstruction of shoring and bracing, removal of stumps and other
305 MoRD / 304 MoRTH and as directed by the departmental
ng the execution and taking all precautionary measures in the
d backfilling in trenches with excavated suitable material and
onal charges etc., complete for Pipe Line trenches by manual

d 301.2.1 of MORT&H
Cum
450.00
384.00

1 Each
1 Each

Rs
Rs

0.00
2396.16
2396.16
326.24
1797.12
4519.52
451.95
0.00
451.95
22.60
474.55

337269598.xlsx - data-WS & Sewer (2)

Page 2052 of 3205

echanical means: Earthwork excavation in all kinds of soil


out, construction of shoring and bracing, removal of stumps and
tion 304 MORTH and as directed by the departmental officer
xecution and taking all precautionary measures in the restricted
n trenches with excavated suitable material and disposal of
s etc., complete for Pipe Lines by mechanical means.

Cum
450.00
384.00

1 Each
1 Each

0.00
3993.60

2791.00

1 hours

16746.00
20739.60
2823.7
23563.30
130.91
0.00
130.91
6.55
137.46

Rs
Rs

ow GL by Manual means: Excavation in Ordinary rock for Pipe


nstruction of shoring and bracing, removal of stumps and other
305 MoRD / 304 MoRTH and as directed by the departmental
ng the execution and taking all precautionary measures in the
isposal of rock upto a lead of 50 m, including all incidental and

Cum
450.00
384.00

1 day.
1 day.

0.00
1996.80
1996.80
271.86
2268.66
226.87
0.00
226.87

elow GL by Machanical means: Excavation in Ordinary Rock


out, construction of shoring and bracing, removal of stumps and
cification 305 MoRD / 304 MoRTH and as directed by the
s possible during the execution and taking all precautionary
n of traffic and disposal of rock upto a lead of 50 m, including
chanical means.

Cum
450.00

1 Each

0.00
337269598.xlsx - data-WS & Sewer (2)

Page 2053 of 3205

384.00

1 Each

2396.16

2791.00

1 hours

16746.00
19142.16
2606.21
21748.37
120.82
0.00
120.82

Rs

avation in Hard rock for Pipe line trenches as per drawings and
emoval of stumps and other deleterious material , dressing of
s directed by the departmental officer including protecting the
ll precautionary measures in the restricted areas for laying
d of 50 m, including all incidental and operational charges etc.,

Cum

576.00
576.00
384.00

1 Each
1 Each
1 Each

288.00
144.00
3206.40

1145.10

1 hours

1145.10

73.00
13.00

1 No
100 Nos

Rs

255.50
1.82
5040.82
686.31
5727.13
572.71
0.00
572.71

Excavation in Hard Rock in habitant areas where conventional


pecifications including setting out, construction of shoring and
ottom as per Technical Specification 305 MoRD / 304 MoRTH
ervices wherever it is possible during the execution and taking
including divertion of traffic and disposal of rock upto a lead of

Cum
450.00
384.00

1 Nos
1 Nos

0.00
1996.80

1145.10

1 hour

6870.60
8867.40
1207.3
10074.70
1007.47
337269598.xlsx - data-WS & Sewer (2)

Page 2054 of 3205

0.00
1007.47

337269598.xlsx - data-WS & Sewer (2)

Page 2055 of 3205

rs including breaking rock, loading in tippers and disposal with


in accordance with requirements of lines, grades and crossachanical means for Sumps, Thrust Blocks and Man Holes
Cum
450.00
576.00

1 day
1 day

0.00
5990.40

2791.00

1 hour

16746.00

909.70
194.00

1 hour
1 cum

5913.05
-3492.00
25157.45
3425.19
28582.64
793.96
0.00
793.96

types of soils up to 3.00 Mts depth below GL by manual


uction of shoring and bracing, removal of stumps and other
and backfilling in trenches with excavated suitable material as
hambers and Man Holes etc. by manual means,

d 301.2.1 of MORT&H
Cum
450.00
384.00

1 Each
1 Each

Rs
Rs

0.00
1397.76
1397.76
190.31
1588.07
158.81
0.00
158.81
7.94
166.75

ypes of soils from 3.00 Mts to 6.00Mts. depth below GL by


nstruction of shoring and bracing, removal of stumps and other
and backfilling in trenches with excavated suitable material as
hambers and Man Holes etc. by manual means,

d 301.2.1 of MORT&H
Cum
450.00
384.00

1 Each
1 Each

0.00
1797.12
1797.12
244.68
337269598.xlsx - data-WS & Sewer (2)

Page 2056 of 3205

Rs
Rs

2041.80
204.18
0.00
204.18
10.21
214.39

337269598.xlsx - data-WS & Sewer (2)

Page 2057 of 3205

d technical specifications Clause 305.1 including setting out,


erial and disposal upto a lead of 50 m, dressing of sides and
Specification 305 MORD / 304 MORTH - in Ordinary soil - by
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
94.4
0.00
94.40
4.72
99.12

Rs
Rs

d technical specifications Clause 305.1 including setting out,


erial and disposal upto a lead of 50 m, dressing of sides and
Specification 305 MORD / 304 MORTH - in Ordinary soil
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
107.88
0.00
107.88
5.39
113.27

Rs
Rs

d technical specifications Clause 305.1 including setting out,


erial and disposal upto a lead of 50 m, dressing of sides and
Specification 305 MORD / 304 MORTH - in Ordinary soil
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

2791.00

1 hours

16746.00
19940.88
2714.95
22655.83
125.87
0.00
125.87
6.29
132.16

Rs
Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2058 of 3205

ng pipe lines including cost and conveyance of all materials,


directed by the departmental officers with all incidental and

450.00

1 day

256.50

384.00

1 day

422.40

23000.00

1 cum

2530.00

3825.00

1 cum

612.00

-628.40

3192.50
434.66
3627.16
80.60
0.00
80.60

450.00

1 day

225.00

384.00

1 day

506.88

23000.00

1 cum

2530.00

3825.00

1 cum

841.50

-674.30

3429.08
466.87
337269598.xlsx - data-WS & Sewer (2)

Page 2059 of 3205

3895.95
86.58
0.00
86.58
ifference of single and double staging) for staging beyond 4.5
92.56
98.54
104.52

337269598.xlsx - data-WS & Sewer (2)

Page 2060 of 3205

and sewerage works for trenches of depths upto 6-0 (2 Meter)

130.00

2.44 rmt

399.59

130.00

2.44 rmt

585.00
984.59
196.92

384.00

1 day

192.00
3.89
3.89
396.70
54.01
450.71
150.24
0.00
150.24

rry to work site and stacking at work site to Dept. gauge for
charges etc. complete as per standard specifications. Clause
Cum
641.93

1 Cum

3851.58

450.00
384.00

1 Nos
1 Nos

0.00
119.04
3970.62
540.6
4511.22
751.87
0.00
751.87

uarry to work site and stacking at work site to Dept. gauge for
charges etc. complete as per standard specifications. Clause
Cum
1001.81

1 Cum

6010.86

450.00
384.00

1 Nos
1 Nos

0.00
119.04
6129.90
834.59
6964.49
1160.75
0.00
1160.75

337269598.xlsx - data-WS & Sewer (2)

Page 2061 of 3205

asement with initial lead in layers not exceeding 15 cm thick,


onveyance of water to work site and all operational, incidental,
S NO. 309 & 310)
Cum
306.76

1 Cum

1840.56

450.00
384.00

1 Nos
1 Nos

0.00
119.04
1959.60
266.8
2226.40
371.07
0.00
371.07

trenches, sides of foundations and basement with initial lead in


d ramming including cost and conveyance of water to work site
or finished item of work. (APSS NO. 309 & 310)
Cum
450.00
384.00

1 Nos
1 Nos

0.00
119.04
16.21
135.25
22.54
0.00
22.54

ding, unloading charges, cost & conveyance, dumping, labour

82.70

82.70

1 Cum
Rs

82.70
0.00
82.70

Rs

82.70
0.00
82.70

1 Cum

ing hire charges, fuel charges and wages for Driver and Helper
53.00

1 Hp.hr

53.00
Rs

53.00
7.22
60.22
0.00

Rs

60.22

337269598.xlsx - data-WS & Sewer (2)

Page 2062 of 3205

202 : Dismantling of existing structures like culverts, bridges,


of unserviceable material and stacking the serviceable material
MORTH - Rubble Stone Masonry in Cement Mortar
Cum
450.00
384.00

1 day
1 day

415.00

1 hour

0.00
299.52

Rs

Rs

112.05
411.57
56.04
467.61
374.09
0.00
374.09

s and other structure comprising of masonry, cement concrete,


he dismantled material, disposal of unserviceable material and
pecification Clause 202 MORD / MORTH
Cum
450.00
384.00

1 day
1 Cum

0.00
399.36

415.00

1 hour

112.05
511.41
69.63
581.04
464.83
0.00
464.83

Rs
Cum
450.00
384.00

1 day
1 Cum

0.00
499.20

415.00

1 hour

112.05
611.25
83.22
694.47
555.58
0.00
555.58

Rs
Cum
450.00
384.00
384.00

1 day
1 day
1 Cum

0.00
153.60
1344.00

415.00

1 hour

112.05
1609.65
219.15
337269598.xlsx - data-WS & Sewer (2)

Page 2063 of 3205

Rs

1828.80
1463.04
0.00
1463.04

337269598.xlsx - data-WS & Sewer (2)

Page 2064 of 3205

ing the pipes, hoisting and keeping within a lead of 10 metres

450.00
384.00

1 day
1 day

225.00
1536.00

750.00
25.00

1 Qtl
1 litre

279.75
9.48
2050.23
279.14
2329.37
57.86
0.00
57.86

Rs

450.00
384.00

1 day
1 day

283.50
1728.00

750.00
25.00

1 Qtl
1 litre

349.50
9.48
2370.48
322.74
2693.22
66.90
0.00
66.90

Rs

450.00
384.00

1 day
1 day

373.50
2112.00

750.00
25.00

1 Qtl
1 litre

497.25
14.20
2996.95
408.03
3404.98
84.57
0.00
84.57

Rs

450.00
384.00

1 day
1 day

495.00
2496.00

337269598.xlsx - data-WS & Sewer (2)

Page 2065 of 3205

750.00
25.00

1 Qtl
1 litre

Rs

630.00
18.93
3639.93
495.58
4135.51
102.72
0.00
102.72

450.00
384.00

1 day
1 day

585.00
2880.00

750.00
25.00

1 Qtl
1 litre

769.50
28.41
4262.91
580.4
4843.31
120.30
0.00
120.30

Rs

450.00
384.00

1 day
1 day

675.00
3264.00

750.00
25.00

1 Qtl
1 litre

840.00
37.88
4816.88
655.82
5472.70
135.93
0.00
135.93

Rs

450.00
384.00

1 day
1 day

787.50
3648.00

750.00
25.00

1 Qtl
1 litre

923.25
37.88
5396.63
734.75
6131.38
152.29
0.00
337269598.xlsx - data-WS & Sewer (2)

Page 2066 of 3205

Rs

152.29

450.00
384.00

1 day
1 day

900.00
4032.00

750.00
25.00

1 Qtl
1 litre

979.50
47.35
5958.85
811.3
6770.15
168.16
0.00
168.16

Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2067 of 3205

450.00
384.00

1 day
1 day

1012.50
4416.00

750.00
25.00

1 Qtl
1 litre

1050.00
56.83
6535.33
889.79
7425.12
184.43
0.00
184.43

Rs

450.00
384.00

1 day
1 day

1125.00
4800.00

750.00
25.00

1 Qtl
1 litre

1119.00
66.30
7110.30
968.07
8078.37
200.65
0.00
200.65

Rs

450.00
384.00

1 day
1 day

1350.00
5568.00

750.00
25.00

1 Qtl
1 litre

1185.00
85.25
8188.25
1114.83
9303.08
231.08
0.00
231.08

Rs

e joint, scraping the pipe, hoisting and keeping within a lead of

450.00
384.00
384.00

1 day
1 day
1 day

45.00
153.60
172.80
371.40
337269598.xlsx - data-WS & Sewer (2)

Page 2068 of 3205

Rs

50.57
421.97
42.20
0.00
42.20

337269598.xlsx - data-WS & Sewer (2)

Page 2069 of 3205

450.00
384.00
384.00

450.00
384.00
384.00

450.00
384.00
384.00

1 day
1 day
1 day

Rs

45.00
188.16
215.04
448.20
61.02
509.22
50.92
0.00
50.92

Rs

45.00
188.16
257.28
490.44
66.77
557.21
55.72
0.00
55.72

Rs

45.00
188.16
303.36
536.52
73.05
609.57
60.96
0.00
60.96

1 day
1 day
1 day

1 day
1 day
1 day

concrete stacking of useful materials near the site with in 50m


cost of earth work excavation. (Reference to specifications BIS

384.00
384.00

1 day
1 day

188.16
138.24
326.40
44.44
370.84
37.08
0.00
37.08

384.00
384.00

1 day
1 day

188.16
172.80
360.96
337269598.xlsx - data-WS & Sewer (2)

Page 2070 of 3205

49.14
410.10
41.01
0.00
41.01

337269598.xlsx - data-WS & Sewer (2)

Page 2071 of 3205

384.00
384.00

1 day
1 day

188.16
195.84
384.00
52.28
436.28
43.63
0.00
43.63

384.00
384.00

1 day
1 day

188.16
218.88
407.04
55.42
462.46
46.25
0.00
46.25

384.00
384.00

1 day
1 day

188.16
241.92
430.08
58.56
488.64
48.86
0.00
48.86

pes and fittings so as not to disturb the existing water supply


mains in including cost and conveyance of all materials, labour

167.00

1 Rmt

167.00

41.00
3.70

192.00

8.20
1 Rmt

3.70

Rs

178.90
24.36
203.26
0.00
203.26

Rmt

192.00

337269598.xlsx - data-WS & Sewer (2)

Page 2072 of 3205

41.00
3.70

8.20
1 Rmt

3.70

Rs

203.90
27.76
231.66
0.00
231.66

337269598.xlsx - data-WS & Sewer (2)

Page 2073 of 3205

252.00

Rmt

41.00
3.70

252.00

8.20
1 Rmt

3.70
263.90
35.93
299.83
0.00
Rs

299.83

9 ISI mark with GI fittings including the cost of pipe & its fittings

350.00

Rmt

41.00
3.70

350.00

8.20
1 Rmt

3.70

Rs

361.90
49.27
411.17
0.00
411.17

9 ISI mark with GI fittings including the cost of pipe & its fittings

396.00

Rmt

44.00
3.70

396.00

8.80
1 Rmt

3.70

Rs

408.50
55.62
464.12
0.00
464.12

9 ISI mark with GI fittings including the cost of pipe & its fittings

432.00

67.00
3.70

Rmt

432.00

13.40
1 Rmt

3.70
449.10
337269598.xlsx - data-WS & Sewer (2)

Page 2074 of 3205

Rs

61.14
510.24
0.00
510.24

337269598.xlsx - data-WS & Sewer (2)

Page 2075 of 3205

distrub the existing sewerage connections during earth work


ance of all materials, labour charges and with all incidental and

212.41
26.85
120.82

1 Rmt
1 Rmt
1 Cum

Rs

212.41
26.85
43.50
282.76
0.00
326.26

Cement concrete nominal mix (1:5:10) prop (Cement : fine


etal including cost and conveyance of all materials like cement,
bour charges , for mixing , laying, concrete , ramming in 15 cm
m of work.for foundation and under flooring bed.

5.740
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
356.37
123.60

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3487.46
474.82
3962.28
0.00
3962.28

Rs
Rs

ain Cement concrete nominal mix (1:4:8) prop (Cement : fine


etal including cost and conveyance of all materials like cement,
bour charges , for mixing , laying, concrete , ramming in 15 cm
m of work.for foundation and under flooring bed.

5.74
1489.81
791.93
77.00

1 Kg
1 Cum
1 Cum
1 Kl

929.88
1340.83
356.37
92.40

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3642.24
495.89
4138.13
0.00

Rs
Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2076 of 3205

Rs

4138.13

337269598.xlsx - data-WS & Sewer (2)

Page 2077 of 3205

prop (Cement : fine aggregate: coarse aggregate ) using 20mm


terials like cement, sand, coarse aggregate water etc., to site ,
, ramming in 15 cm layers, finishing top surface to the required
g bed.

5.74
1684.81
791.93
77.00

1 Kg
1 Cum
1 Cum
1 Kl

1262.80
1516.33
356.37
92.40

504.00
384.00

1 day
1 day

50.40
906.24
4184.54
569.73
4754.27
0.00
4754.27

Rs
Rs
Rs

concrete nominal mix m-20 (Cement : fine aggregate: coarse


uding cost and conveyance of all materials like cement, sand,
harges , for mixing , laying, concrete , ramming in 15 cm layers,
ork with nomonal reinforcement

5.74
1684.81
791.93
77.00
504.00
384.00
338.60

4782.06
315.00
710.00

1 Kg
1 Cum
1 Cum
1 Kl
1 Each
1 Each
1 hour

Rs

1894.20
1516.33
356.37
92.40
50.40
533.76
338.60
4782.06
0.00
4782.06

Rs

4782.06
315.00
710.00
142.00
5949.06
809.96
6759.02
0.00
6759.02

1 Cum
1 Cum
1 Cum

4782.06
0.00

1 Cum
1 Cum

4782.06
0.00

0.00

1 Cum

0.00
0.00
4782.06
651.08

Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2078 of 3205

Rs

5433.14
0.00
5433.14

337269598.xlsx - data-WS & Sewer (2)

Page 2079 of 3205

4782.06
160.00
45.84

1 Cum
1 Cum
1 Kg
Rs

Rs

4782.06
160.00
45.84

1 Cum
1 Cum
1 Kg

1578.08
52.80
756.36
2387.24
325.02
0.00
2712.26

161.39
5.40
115.98
282.77
38.5
321.27

Rs.

concrete nominal mix M-30 (Cement : fine aggregate: coarse


uding cost and conveyance of all materials like cement, sand,
harges , for mixing , laying, concrete , ramming in 15 cm layers,
ork with nomonal reinforcement for Road restoration.

5.74
1684.81
791.93
77.00
504.00
384.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 Each
1 Each
1 hour

Rs

2296.00
1516.33
356.37
92.40
50.40
533.76
338.60
5183.86
705.78
5889.64
0.00
5889.64

minal Mix 1:2.5:5 (Cement : fine aggregate: coarse aggregate )


and conveyance of all materials like cement, sand, coarse
ges , for mixing , laying, concrete , ramming in 15 cm layers,
ork with nomonal reinforcement

5.74
1489.81
791.93
77.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1340.83
356.37
92.40
338.60

337269598.xlsx - data-WS & Sewer (2)

Page 2080 of 3205

504.00
384.00

1 day
1 day

50.40
533.76
4606.56
627.18
5233.74
0.00
5233.74

Rs

aggregate) corresponding to Table 9 of IS 456 using 20mm size


rry including cost and conveyance of all materials like cement,
age charges, sales & other taxes on all materials including all
rete, curing etc.,complete but excluding cost of steel and its
RCC SLABS, BEAMS

1684.81
791.93
5.74

1 Cum
1 Cum
1 Cum

1516.33
356.37
2296.00
4168.70

504.00
450.00
384.00

1 Cum
1 Cum
1 Cum

33.77
59.85
960.00
1053.62

338.60
175.40
77.00

1 Cum
1 hour
1 Cum

90.41
46.83
92.40
229.64
5451.96
742.28
6194.24
0.00
6194.24

Rs

Thick
5451.96
152.00
121.00

0.15 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs

5451.96
1013.84
807.07
161.41
7434.28
1012.18
6803.71
0.00
6803.71

mooth including cost and conveyance of all materials to site,


onal, incidental, labour charges etc., including cutting grooves
10 Sqm.

3045.08

1 Cum

456.76
337269598.xlsx - data-WS & Sewer (2)

Page 2081 of 3205

504.00
384.00

1 Nos
1 Nos

Rs

302.40
368.64
1127.80
153.55
1281.35
0.00
1281.35

337269598.xlsx - data-WS & Sewer (2)

Page 2082 of 3205

smooth including cost and conveyance of all materials to site,


onal, incidental, labour charges etc., including cutting grooves
10 Sqm.

3733.88

1 Cum

504.00
384.00

1 Nos
1 Nos

784.11

Rs

473.76
61.44
1319.31
179.62
1498.93
0.00
1498.93

surface with CM(1:3), 20mm thick with 1kg of water proof


aterials, seigniorage charges, excluding conveyance charges of
tar, laying, rendering smooth and thread lining, curing, rounding

3733.88
52.00

1 Nos
1 Kg

784.11
104.00

504.00
450.00
384.00

1 Nos
1 Nos
1 Nos

332.64
693.00
1420.80
3334.55
454
3788.55
0.00
3788.55

Rs

Rs

even shade after thoroughly brushing the surface to remove all


r charges and incidental such as scaffolding, lift charges etc.,

29.00

1 Kg

58.00
10.00

504.00
384.00

1 Nos
1 Nos

105.84
122.88
296.72
2.97
299.69
40.8
340.49
0.00
340.49

Rs

Rs

w Wood Work, Old Wood Work & New Iron Work including cost
and all labour charges etc., complete for finished item of work.
193.00

1 Ltr

135.10

337269598.xlsx - data-WS & Sewer (2)

Page 2083 of 3205

576.00
450.00

1 day.
1 day.
Rs

Rs

120.96
220.50
0.00
476.56
64.88
541.44
0.00
541.44

chanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/
g labour charges for straightening, cutting, bending to required
d size and tying and lap-splicing with binding wire of 18 SWG,
ding cost and conveyance of steel bars, including all wastages
binding wire, cover blocks and all incidental, operational, labour
r taxes on all materials etc., complete for finished item of work

34000.00

1 Ton

35700.00

70.00

1 kg

420.00

588.00
384.00

1 day
1 day

5880.00
3840.00
45840.00

1 MT
Sub Total:
Rs.

6241.12
52081.12
0.00
52081.12
52.08

uivalent quality 20x20x4 mm thick , set over base coat of


uding neat cement slurry of honey like consistency spread @
pigment of matching shade, including cost of all materials like
complete for finished item of work, but excluding the cost of

1423.00
5.74
5.74
5.74
858.93
858.93

1 sqm
1 kg.
1 kg.
1 kg.
1 cum
1 cum

14941.50
123.98
189.42
34.44
103.07
17.18

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
18168.63
181.69
18350.32
337269598.xlsx - data-WS & Sewer (2)

Page 2084 of 3205

Rs

2498.4
20848.72
0.00
20848.72

337269598.xlsx - data-WS & Sewer (2)

Page 2085 of 3205

ying them true to alignment and gradient including all sundries


ecifications. BIS No.3114/94)

576.00
450.00
384.00

1 day
1 day
1 day

58.75
107.10
510.72
676.57
67.66
1.316

with s/s ends carefully into trenches and laying them true to
e of pipes from source of supply (Ref to specifications. BIS

l be as per sub-analysis made for 200 mm dia CI Pipes S/s

1.316

1.316

1.316

1.316

1 Kg

Rs

112.52
15.32
127.84
25.57
0.00
25.57

Rs

143.01
19.47
162.48
32.50
0.00
32.50

Rs

185.99
25.32
211.31
42.26
0.00
42.26

1 Kg

1 Kg

1 Kg

232.93
31.71
337269598.xlsx - data-WS & Sewer (2)

Page 2086 of 3205

Rs

264.64
52.93
0.00
52.93

337269598.xlsx - data-WS & Sewer (2)

Page 2087 of 3205

1.316

1.316

1.316

1.316

1.316

1.316

1 Kg

Rs

338.65
46.11
384.76
76.95
0.00
76.95

Rs

457.53
62.29
519.82
103.96
0.00
103.96

Rs

591.77
80.57
672.34
134.47
0.00
134.47

Rs

742.22
101.05
843.27
168.65
0.00
168.65

Rs

905.84
123.33
1029.17
205.83
0.00
205.83

Rs

1095.79
149.19
1244.98
249.00
0.00
249.00

1 Kg

1 Kg

1 Kg

1 Kg

1 Kg

337269598.xlsx - data-WS & Sewer (2)

Page 2088 of 3205

1.316

1 Kg

Rs

1277.40
173.92
1451.32
290.26
0.00
290.26

337269598.xlsx - data-WS & Sewer (2)

Page 2089 of 3205

1.316

1.316

1.316

1.316

1.316

1.316

1 Kg

Rs

1705.54
232.21
1937.75
387.55
0.00
387.55

Rs

2200.35
299.58
2499.93
499.99
0.00
499.99

Rs

2466.62
335.83
2802.45
560.49
0.00
560.49

Rs

2753.95
374.95
3128.90
625.78
0.00
625.78

Rs

3347.90
455.82
3803.72
760.74
0.00
760.74

Rs

4037.49
549.7
4587.19
917.44
0.00
917.44

1 Kg

1 Kg

1 Kg

1 Kg

1 Kg

337269598.xlsx - data-WS & Sewer (2)

Page 2090 of 3205

ydralic field test pressure including transportation of Water with

504.00
450.00

1 day
1 day

1512.00
1350.00

1200.00

1 days

3600.00

500.00
151.00
500.00
1500.00
57.00

1 Nos
1 RM
1 Ls
1 Each
1 Lts.

25.00
453.00
500.00
150.00
3420.00
11010.00
22.02
0.489
of pipe based on this analysis, for an varities of pipes for

oint), excluding the cost of the gasket but including all sundries
pressure, etc. complete Reference to specifications IS

450.00
384.00

3.91

1 day
1 day

135.00
307.20
442.20

1 rm

195.50

637.70
6.38

Rs

644.08
87.69
731.77
73.18
0.00
73.18

337269598.xlsx - data-WS & Sewer (2)

Page 2091 of 3205

450.00
384.00

4.89

1 day
1 day

225.00
384.00
609.00

1 rm

244.50
853.50
8.54

Rs

450.00
384.00

6.11

862.04
117.37
979.41
97.94
0.00
97.94

1 day
1 day

225.00
384.00
609.00

1 rm

305.50
914.50
9.15

Rs

450.00
384.00

7.34

923.65
125.75
1049.40
104.94
0.00
104.94

1 day
1 day

270.00
422.40
692.40

1 rm

367.00
1059.40
10.59
1069.99
145.68
1215.67
337269598.xlsx - data-WS & Sewer (2)

Page 2092 of 3205

Rs

121.57
0.00
121.57

337269598.xlsx - data-WS & Sewer (2)

Page 2093 of 3205

450.00
384.00

9.78

1 day
1 day

270.00
422.40
692.40

1 rm

489.00
1181.40
11.81

Rs

1193.21
162.46
1355.67
135.57
0.00
135.57

450.00
384.00

1 day
1 day

279.00
460.80
739.80

12.23

1 rm

611.50
1351.30
13.51

Rs

1364.81
185.82
1550.63
155.06
0.00
155.06

450.00
384.00

1 day
1 day

360.00
460.80
820.80

14.67

1 rm

733.50
1554.30
15.54
1569.84
213.73
1783.57
178.36
337269598.xlsx - data-WS & Sewer (2)

Page 2094 of 3205

Rs

0.00
178.36

337269598.xlsx - data-WS & Sewer (2)

Page 2095 of 3205

450.00
384.00

1 day
1 day

405.00
576.00
981.00

17.12

1 rm

856.00
1837.00
18.37

Rs

1855.37
252.61
2107.98
210.80
0.00
210.80

450.00
384.00

1 day
1 day

450.00
576.00
1026.00

19.56

1 rm

978.00
2004.00
20.04

Rs

2024.04
275.57
2299.61
229.96
0.00
229.96

450.00
384.00

1 day
1 day

540.00
652.80
1192.80

22.01

1 rm

1100.50
2293.30
22.93
2316.23
315.35
2631.58
263.16
337269598.xlsx - data-WS & Sewer (2)

Page 2096 of 3205

Rs

0.00
263.16

337269598.xlsx - data-WS & Sewer (2)

Page 2097 of 3205

450.00
384.00

1 day
1 day

585.00
691.20
1276.20

24.45

1 rm

1222.50
2498.70
24.99

Rs

2523.69
343.6
2867.29
286.73
0.00
286.73

450.00
384.00

1 day
1 day

675.00
768.00
1443.00

29.34

1 rm

1467.00
2910.00
29.10

Rs

2939.10
400.16
3339.26
333.93
0.00
333.93

450.00
384.00

1 day
1 day

720.00
806.40
1526.40

31.79

1 rm

1589.50
3115.90
31.16
3147.06
428.47
3575.53
357.55
337269598.xlsx - data-WS & Sewer (2)

Page 2098 of 3205

Rs

0.00
357.55

337269598.xlsx - data-WS & Sewer (2)

Page 2099 of 3205

450.00
384.00

1 day
1 day

765.00
844.80
1609.80

34.23

1 rm

1711.50
3321.30
33.21

Rs

3354.51
456.72
3811.23
381.12
0.00
381.12

450.00
384.00

1 day
1 day

765.00
844.80
1609.80

36.68

1 rm

1834.00
3443.80
34.44

Rs

576.00
450.00
480.00

1 day
1 day
1 day

3478.24
473.56
3951.80
395.18
0.00
395.18

1353.60
2115.00
312.00
3780.60

39.12

1 rm

1956.00
5736.60
57.37
5793.97
788.85
6582.82
337269598.xlsx - data-WS & Sewer (2)

Page 2100 of 3205

Rs

658.28
0.00
658.28

337269598.xlsx - data-WS & Sewer (2)

Page 2101 of 3205

576.00
450.00
480.00

1 day
1 day
1 day

1584.00
2475.00
336.00
4395.00

44.01

1 rm

2200.50
6595.50
65.96

Rs

576.00
450.00
480.00

1 day
1 day
1 day

6661.46
906.96
7568.42
756.84
0.00
756.84

1728.00
2700.00
360.00
4788.00

48.90

1 rm

2445.00
7233.00
72.33

Rs

7305.33
994.62
8299.95
830.00
0.00
830.00

337269598.xlsx - data-WS & Sewer (2)

Page 2102 of 3205

uding cost of jointing materials such as bolts, rubber insertion,


required pressure complete. (Reference to specifications. BIS

576.00
450.00
384.00

1 day
1 day
1 day

51.84
94.50
307.20
453.54

123.00

1 kg

836.40

103.00

1 kg

218.88

3.91

1 rm

107.53

1616.35
5.61

Rs

1621.96
220.83
1842.79
184.28
0.00
184.28

576.00
450.00
384.00

1 day
1 day
1 day

86.40
157.50
384.00
627.90

123.00
103.00

1 kg
1 kg

1672.80
261.62

4.89

1 rm

134.48
2696.80
7.62

Rs

2704.42
368.21
3072.63
307.26
307.26

337269598.xlsx - data-WS & Sewer (2)

Page 2103 of 3205

576.00
450.00
384.00

1 day
1 day
1 day

86.40
157.50
384.00
627.90

123.00
103.00

1 kg
1 kg

1672.80
323.42

6.11

1 rm

168.03
2792.15
7.96

Rs

2800.11
381.23
3181.34
318.13
318.13

576.00
450.00
384.00

1 day
1 day
1 day

103.68
189.00
422.40
715.08

123.00
103.00

1 kg
1 kg

2952.00
442.90

7.34

1 rm

201.85
4311.83
9.17

Rs

4321.00
588.3
4909.30
490.93
0.00
490.93

576.00
450.00
384.00

1 day
1 day
1 day

103.68
189.00
422.40
715.08

123.00
103.00

1 kg
1 kg

3099.60
634.48

9.78

1 rm

268.95
4718.11
337269598.xlsx - data-WS & Sewer (2)

Page 2104 of 3205

9.84

Rs

4727.95
643.71
5371.66
537.17
0.00
537.17

337269598.xlsx - data-WS & Sewer (2)

Page 2105 of 3205

576.00
450.00
384.00

1 day
1 day
1 day

115.20
189.00
460.80
765.00

123.00
103.00

1 kg
1 kg

4870.80
875.50

12.23

1 rm

336.33
6847.63
11.01

Rs

6858.64
933.8
7792.44
779.24
0.00
779.24

576.00
450.00
384.00

1 day
1 day
1 day

138.24
252.00
460.80
851.04

123.00
103.00

1 kg
1 kg

4870.80
1058.84

14.67

1 rm

403.43
7184.11
12.54

Rs

7196.65
979.82
8176.47
817.65
0.00
817.65

576.00
450.00
384.00

1 day
1 day
1 day

172.80
270.00
576.00
1018.80

123.00
103.00

1 kg
1 kg

6691.20
2189.78

337269598.xlsx - data-WS & Sewer (2)

Page 2106 of 3205

17.12

1 rm

470.80
10370.58
14.90

Rs

10385.48
1413.98
11799.46
1179.95
0.00
1179.95

576.00
450.00
384.00

1 day
1 day
1 day

172.80
315.00
576.00
1063.80

123.00
103.00

1 kg
1 kg

12103.20
2846.92

19.56

1 rm

537.90
16551.82
16.02

Rs

16567.84
2255.71
18823.55
1882.36
0.00
1882.36

576.00
450.00
384.00

1 day
1 day
1 day

207.36
378.00
652.80
1238.16

123.00
103.00

1 kg
1 kg

15129.00
2333.98

22.01

1 rm

605.28
19306.42
18.43

Rs

19324.85
2631.08
21955.93
2195.59
0.00
2195.59

337269598.xlsx - data-WS & Sewer (2)

Page 2107 of 3205

576.00
450.00
384.00

1 day
1 day
1 day

224.64
409.50
691.20
1325.34

123.00
103.00

1 kg
1 kg

16482.00
3933.57

24.45

1 rm

672.38
22413.29
19.98

Rs

22433.27
3054.29
25487.56
2548.76
0.00
2548.76

576.00
450.00
384.00

1 day
1 day
1 day

259.20
472.50
768.00
1499.70

123.00
103.00

1 kg
1 kg

23616.00
5326.13

29.34

1 rm

806.85
31248.68
23.07

Rs

31271.75
4257.65
35529.40
3552.94
0.00
3552.94

576.00
450.00
384.00

1 day
1 day
1 day

293.76
535.50
844.80
1674.06

123.00
103.00

1 kg
1 kg

30110.40
7097.73

34.23

1 rm

941.33
39823.52

337269598.xlsx - data-WS & Sewer (2)

Page 2108 of 3205

26.15

Rs

39849.67
5425.53
45275.20
4527.52
0.00
4527.52

576.00
450.00
384.00

1 day
1 day
1 day

293.76
535.50
844.80
1674.06

123.00
103.00

1 kg
1 kg

32029.20
8078.29

36.68

1 rm

1008.70
42790.25
26.83

6389.00

7514.00

8653.00

9821.00

Rs

42817.08
5829.55
48646.63
4864.66
0.00
4864.66

Rs

6389.00
869.86
7258.86
0.00
7258.86

Rs

7514.00
1023.03
8537.03
0.00
8537.03

Rs

8653.00
1178.11
9831.11
0.00
9831.11

Rs

9821.00
1337.13
11158.13
0.00
11158.13

1 No

1 No

1 No

1 No

337269598.xlsx - data-WS & Sewer (2)

Page 2109 of 3205

11030.00

1 No

Rs

11030.00
1501.73
12531.73
0.00
12531.73

storage tank with Double layer approved brand & manufacture


utlets and over flow pipes but without fittings & base support for
6.00

1 Kg

6.00

1.00

Rs

0.20
6.20
0.84
7.04
0.00
7.04

got and socket ends, with all necessary fittings as per IS 3114,
d testing to required pressure including cost and conveyance of
CP & OH )

1097.16
141.60
32.50
97.94

1512.20
205.86
52.93
121.57

2101.47
250.43
76.95
135.57

2821.63
279.28
103.96
155.06

1 Rmt
1 No
1 Rmt
1 No

Rs

1097.16
25.77
32.50
17.83
1173.26
0.00
1173.26

Rs

1512.20
37.47
52.93
22.13
1624.73
0.00
1624.73

Rs

2101.47
45.58
76.95
24.67
2248.67
0.00
2248.67

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

2821.63
50.83
103.96
28.22
3004.64
337269598.xlsx - data-WS & Sewer (2)

Page 2110 of 3205

3647.50
426.13
134.47
178.36

4584.27
538.89
168.65
210.80

5560.29
588.71
205.83
229.96

8009.36
633.29
249.00
263.16

Rs

0.00
3004.64

Rs

3647.50
77.56
134.47
32.46
3891.99
0.00
3891.99

Rs

4584.27
98.08
168.65
38.37
4889.37
0.00
4889.37

Rs

5560.29
107.15
205.83
41.85
5915.12
0.00
5915.12

Rs

8009.36
115.26
249.00
47.90
8421.52
0.00
8421.52

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

1 Rmt
1 No
1 Rmt
1 No

337269598.xlsx - data-WS & Sewer (2)

Page 2111 of 3205

ia of pipes in mm.)

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

1 day
1 day

Rs

27.00
23.04
50.04
6.81
56.85
0.00
56.85

Rs

36.00
30.72
66.72
9.08
75.80
0.00
75.80

Rs

49.50
42.24
91.74
12.49
104.23
0.00
104.23

Rs

67.50
57.60
125.10
17.03
142.13
0.00
142.13

Rs

90.00
76.80
166.80
22.71
189.51
0.00
189.51

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

112.50
96.00
208.50
28.39
236.89
337269598.xlsx - data-WS & Sewer (2)

Page 2112 of 3205

Rs

0.00
236.89

337269598.xlsx - data-WS & Sewer (2)

Page 2113 of 3205

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

450.00
384.00

1 day
1 day

Rs

135.00
115.20
250.20
34.06
284.26
0.00
284.26

Rs

157.50
134.40
291.90
39.74
331.64
0.00
331.64

Rs

180.00
153.60
333.60
45.42
379.02
0.00
379.02

Rs

202.50
172.80
375.30
51.1
426.40
0.00
426.40

Rs

225.00
192.00
417.00
56.77
473.77
0.00
473.77

Rs

270.00
230.40
500.40
68.13
568.53
0.00
568.53

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

1 day
1 day

337269598.xlsx - data-WS & Sewer (2)

Page 2114 of 3205

499.00

1 No

Rs

499.00
67.94
566.94
0.00
566.94

337269598.xlsx - data-WS & Sewer (2)

Page 2115 of 3205

537.00

572.00

642.00

714.00

787.00

858.00

1 No

Rs

537.00
73.11
610.11
0.00
610.11

Rs

572.00
77.88
649.88
0.00
649.88

Rs

642.00
87.41
729.41
0.00
729.41

Rs

714.00
97.21
811.21
0.00
811.21

Rs

787.00
107.15
894.15
0.00
894.15

Rs

858.00
116.82
974.82
0.00
974.82

1 No

1 No

1 No

1 No

1 No

y tunneling work through specialized pipe jacking method by


cking technique complete including tunneling, excavation in all
sing pipe pits, and conveyance charges of machinery and other
ncerned authorities as per approved drawings and directed by

26000.00
16487.49

1 Rmt
1 Rmt

26000.00
16487.49
42487.49
5784.67
48272.16
0.00
48272.16

27300.00

1 Rmt

27300.00
337269598.xlsx - data-WS & Sewer (2)

Page 2116 of 3205

18408.43

1 Rmt

18408.43
45708.43
6223.20
51931.63
0.00
51931.63

337269598.xlsx - data-WS & Sewer (2)

Page 2117 of 3205

28600.00
20649.08

1 Rmt
1 Rmt

28600.00
20649.08
49249.08
6705.26
55954.34
0.00
55954.34

29900.00
24313.74

1 Rmt
1 Rmt

29900.00
24313.74
54213.74
7381.20
61594.94
0.00
61594.94

31200.00
27454.44

1 Rmt
1 Rmt

31200.00
27454.44
58654.44
7985.80
66640.24
0.00
66640.24

32500.00
29954.67

1 Rmt
1 Rmt

32500.00
29954.67
62454.67
8503.20
70957.87
0.00
70957.87

35100.00
31872.19

1 Rmt
1 Rmt

35100.00
31872.19
66972.19
9118.26
76090.45
0.00
76090.45

39000.00
34119.80

1 Rmt
1 Rmt

39000.00
34119.80
73119.80
9955.26
83075.06
0.00
83075.06

337269598.xlsx - data-WS & Sewer (2)

Page 2118 of 3205

dia cold twisted deformed steel Anchor rods with 0.75m length
ete/ masonry including cost of all materials, machinary, labour,
etc, with intial lead up to 50m and all lifts.

38.00

1 Kg

900.60

154.00

1 Rmt

1155.00

97.00

1 Rmt

727.50

588.00
450.00
384.00

1 day
1 day
1 day

294.00
225.00
384.00
3686.10
368.610
368.61
0.00
368.61

Rs
Rs
Rs

m
399.91

1 Rmt

39990.50

120.82
1160.75
68.40

1 Cum
1 Cum
1 Rmt

6645.10
5803.75
6840.00
59279.35
592.79
12.00
604.79
0.00
604.79

n and dismantling of foundation concrete and lines under the


00 m and stacking the serviceable and unserviceable material

Nos
450.00
384.00
576.00

1 day
1 day
1 day

0.00
4024.32
1152.00

415.00

1 hour

622.50
5798.82
789.51
6588.33
219.61
0.00
219.61

337269598.xlsx - data-WS & Sewer (2)

Page 2119 of 3205

d alignment of the pipeline including cost and conveyance of all


219.61
2585.00

1 No
1 No

4138.13
6759.02

1 Cum
1 Cum

219.61
2585.00

869.01
675.90
4349.52
337.2
4686.72

LS

peline including Earth work excavation, shifting of cables and


120.82

1 Cum

40.78

LS

12.23
53.01

x 0.90 m made with 4 nos vertical and 8 nos horizontal MS flats


cking arrangements as per approved drawing and as directed
oats over one coat of primery coat including cost of all materials
uly embodying in CC(1:4:8) prop , and all other incidental and

0.05
0.05

0.90

39.20
39.20
0.89

0.90
0.45
0.45

0.90
0.50
0.50
38.00
38.00
22.00
47.66
158.81
4782.06

14.90 Kg
10.98 Kg
48.06 Kg
4.05 Sqm
0.41 Cum
0.41 Cum
1 Kg
1 Kg
1 Kg
1 Sqm
1 Cum
1 Cum

Rs

983.44
1826.28
1626.68
325.34
617.67
65.11
1960.64
185.00
7590.16

0.00
7590.16

ncluding cost and conveyance of pipes i.e laoding at factory,

013-14
314.00

1 Rmt

314.00
42.75
356.75
0.00
337269598.xlsx - data-WS & Sewer (2)

Page 2120 of 3205

356.75

485.00

1 Rmt

485.00
66.03
551.03
0.00
551.03

337269598.xlsx - data-WS & Sewer (2)

Page 2121 of 3205

888.00

1 Rmt

888.00
120.9
1008.90
0.00
1008.90

1280.00

1 Rmt

1280.00
174.27
1454.27
0.00
1454.27

1742.00

1 Rmt

1742.00
237.17
1979.17
0.00
1979.17

2100.00

1 Rmt

2100.00
285.92
2385.92
0.00
2385.92

2536.00

1 Rmt

2536.00
345.28
2881.28
0.00
2881.28

radient, jointing, and testing of stone ware pipes including cost


but excluding cost and conveyance of pipe. (Reference to

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

5.74
858.93
128.00

1t
1 cum
1 kgs

453.60
945.00
1536.00
384.00
3318.60
0.00
0.56
58.41
1152.00
337269598.xlsx - data-WS & Sewer (2)

Page 2122 of 3205

4529.57
33.19
4562.76
621.22
5183.98
172.80
172.80
0.00
172.80

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

5.74
858.93
128.00

1t
1 cum
1 kgs

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

5.74
858.93
128.00

1t
1 cum
1 kgs

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

529.20
1102.50
1728.00
480.00
3839.70
0.00
0.75
78.16
1536.00
5454.61
38.40
5493.01
747.87
6240.88
208.03
208.05
0.00
208.05

604.80
1260.00
1920.00
576.00
4360.80
0.00
0.84
87.61
1728.00
6177.25
43.61
6220.86
846.97
7067.83
235.59
235.60
0.00
235.60

680.40
1417.50
2112.00
576.00
4785.90
337269598.xlsx - data-WS & Sewer (2)

Page 2123 of 3205

5.74
858.93
128.00

1t
1 cum
1 kgs

0.00
0.93
97.06
1920.00
6803.89
47.86
6851.75
932.87
7784.62
259.49
259.50
0.00
259.50

337269598.xlsx - data-WS & Sewer (2)

Page 2124 of 3205

504.00
450.00
384.00
384.00

5.74
858.93
128.00

1 day
1 day
1 day
1 day

756.00
1575.00
2304.00
576.00

1t
1 cum
1 kgs

5211.00
0.00
1.11
116.81
2304.00
7632.92
52.11
7685.03
1046.32
8731.35
291.05
291.05
0.00
291.05

504.00
450.00
384.00
384.00

0.00
5.74
858.93
128.00

1 day
1 day
1 day
1 day

831.60
1732.50
2688.00
672.00

1t
1 cum
1 kgs

5924.10
0.00
1.29
136.57
2688.00
8749.96
59.24
8809.20
1199.37
10008.57
333.62
333.65
0.00
333.65

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

0.00
5.74
858.93
128.00

1t
1 cum
1 kgs

907.20
1890.00
3072.00
672.00
6541.20
0.00
1.47
155.47
3072.00
9770.14
65.41
337269598.xlsx - data-WS & Sewer (2)

Page 2125 of 3205

9835.55
1339.11
11174.66
372.49
372.50
0.00
372.50

337269598.xlsx - data-WS & Sewer (2)

Page 2126 of 3205

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

5.74
858.93
128.00

1t
1 cum
1 kgs

1058.40
2205.00
3840.00
768.00
7871.40
0.00
1.68
175.22
3456.00
11504.30
78.71
11583.01
1577.03
13160.04
438.67
438.70
438.70

.I.S. 458/2003 ex-Factory, ( Rate per Meter of effective length)

1154.00
4000.00
5740.00

1 Rmt

1154.00

25.06
41000.00
36000.00
-15.15
1163.91
49.68
1.52

1471.00
4000.00
5740.00

49.68
7.60
1221.19
166.27
145.49
58.20
1591.15
1591.15

1 Rmt

1471.00

62.64
41000.00
36000.00
-21.85
1511.79

337269598.xlsx - data-WS & Sewer (2)

Page 2127 of 3205

54.00
1.77

54.00
8.85
1574.64
214.39
188.97
75.59
2053.59
2053.59

337269598.xlsx - data-WS & Sewer (2)

Page 2128 of 3205

1630.00
4000.00
5740.00

1 Rmt

1630.00

68.90
41000.00
36000.00
-23.95
1674.95
66.96
3.31

1799.00
4000.00
5740.00

66.96
16.55
1758.46
239.41
209.37
83.75
2290.99
0.00
2290.99

1 Rmt

1799.00

75.17
41000.00
36000.00
-26.65
1847.52
73.44
3.31

2057.00
4000.00
5740.00

73.44
16.55
1937.51
263.79
230.94
92.38
2524.62
0.00
2524.62

1 Rmt

2057.00

87.70
41000.00
36000.00
-32.35
2112.35
81.00

81.00
337269598.xlsx - data-WS & Sewer (2)

Page 2129 of 3205

3.56

2885.00
4000.00
5740.00

17.80
2211.15
301.05
264.04
105.62
2881.86
0.00
2881.86

1 Rmt

2885.00

112.75
41000.00
36000.00
-45.95
2951.80
109.08
5.08

3683.00
4000.00
5740.00

109.08
25.40
3086.28
420.20
368.98
147.59
4023.05
0.00
4023.05

1 Rmt

3683.00

131.54
41000.00
36000.00
-68.05
3746.49
146.88
10.04

4875.00
4000.00

146.88
50.20
3943.57
536.92
468.31
187.32
5136.12
0.00
5136.12

1 Rmt

4875.00

337269598.xlsx - data-WS & Sewer (2)

Page 2130 of 3205

5740.00
169.13
41000.00
36000.00
-92.85
4951.28
173.88
10.04

1658.00
4000.00
5740.00

173.88
50.20
5175.36
704.63
618.91
247.56
6746.46
0.00
6746.46

1 Rmt

1658.00

68.90
41000.00
36000.00
-23.95
1702.95
66.96
3.31

1812.00
4000.00
5740.00

66.96
16.55
1786.46
243.23
212.87
85.15
2327.71
0.00
2327.71
1 Rmt

1812.00

75.17
41000.00
36000.00
-26.65
1860.52
73.44
3.31

73.44
16.55
1950.51
337269598.xlsx - data-WS & Sewer (2)

Page 2131 of 3205

265.56
232.57
93.03
2541.67
0.00
2541.67
2235.00
4000.00
5740.00

1 Rmt

2235.00

87.70
41000.00
36000.00
-32.35
2290.35
81.00
3.56

2965.00
4000.00
5740.00

81.00
17.80
2389.15
334.48
283.09
114.52
3121.24
0.00
3121.24

1 Rmt

2965.00

112.75
41000.00
36000.00
-45.95
3031.80
109.08
5.08

3856.00
4000.00
5740.00

109.08
25.40
3166.28
443.28
374.73
151.59
4135.88
0.00
4135.88

1 Rmt

3856.00

131.54
337269598.xlsx - data-WS & Sewer (2)

Page 2132 of 3205

41000.00
36000.00
-68.05
3919.49
146.88
10.04

5035.00
4000.00
5740.00

146.88
50.20
4116.57
576.32
484.45
195.97
5373.31
5373.31

1 Rmt

5035.00

169.13
41000.00
36000.00
-92.85
5111.28
173.88
10.04

173.88
50.20
5335.36
746.95
631.75
255.56
6969.62
6969.62

337269598.xlsx - data-WS & Sewer (2)

Page 2133 of 3205

ot Pipes confirming to B.I.S. 5382/ 1985 (RATE PER EACH


ng VAT etc.complete.
ST @

Sub-Total OH& CP @

5%
1.45
1.75
3.15
3.70
4.05
4.55
5.55
6.45
7.10
8.05
10.50
13.80
18.75
23.80
ST @

14%

34.03
41.08
73.94
86.85
95.06
106.80
130.27
151.39
166.65
188.95
246.46
323.91
440.10
558.63

4.06
4.90
8.82
10.36
11.34
12.74
15.54
18.06
19.88
22.54
29.40
38.64
52.50
66.64

38.09
45.98
82.76
97.21
106.40
119.54
145.81
169.45
186.53
211.49
275.86
362.55
492.60
625.27

Sub-Total OH& CP @

Total

5%
7.15
8.55
9.70
11.00
12.60
18.30
21.90
26.55
35.90
43.35

Total

14%

167.82
200.69
227.68
258.19
295.75
429.54
514.04
623.18
842.64
1017.51

20.02
23.94
27.16
30.80
35.28
51.24
61.32
74.34
100.52
121.38

187.84
224.63
254.84
288.99
331.03
480.78
575.36
697.52
943.16
1138.89

ydralic field test pressure including transportation of Water with

504.00
450.00

1 day
1 day

1512.00
1350.00

1200.00

1 days

3600.00

500.00
151.00

1 Nos
1 RM

25.00
453.00

500.00
1500.00
57.00

1 Ls
1 Each
1 Lts.

500.00
150.00
3420.00
11010.00
22.02
0.489

337269598.xlsx - data-WS & Sewer (2)

Page 2134 of 3205

m true to alignment and gradient, jointing with rubber rings and


rubber rings as per BIS No. 783/1985 - RCC-NP2

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

393.12
810.00
1920.00
499.20
3622.32

34.03

1 each

1701.50

3.91

1 rm

391.00

5714.82
40.13

Rs

5754.95
783.54
6538.49
65.38
0.00
65.38

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

483.84
1008.00
2419.20
614.40
4525.44

41.08

1 each

2054.00

4.89

1 rm

489.00
7068.44
50.14

Rs

7118.58
969.19
8087.77
80.88
0.00
80.88

337269598.xlsx - data-WS & Sewer (2)

Page 2135 of 3205

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

589.68
1228.50
2995.20
614.40
5427.78

73.94

1 each

3697.00

7.34

1 rm

734.00
9858.78
61.62

Rs

9920.40
1350.66
11271.06
112.71
0.00
#REF!

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

589.68
1228.50
2995.20
614.40
5427.78

86.85

1 each

4342.50

9.78

1 rm

978.00
10748.28
64.06

Rs

10812.34
1472.10
12284.44
122.84
0.00
122.84

337269598.xlsx - data-WS & Sewer (2)

Page 2136 of 3205

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

816.48
1701.00
4032.00
883.20
7432.68

95.06

1 each

4753.00

11.00

1 rm

1100.00
13285.68
85.33

Rs

13371.01
1820.46
15191.47
151.91
0.00
151.91

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

816.48
1701.00
4032.00
883.20
7432.68

106.80

1 each

5340.00

1 rm

1223.00

12.23

13995.68
86.56

Rs

14082.24
1917.30
15999.54
160.00
0.00
160.00

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

882.00
1863.00
4454.40
883.20
8082.60

130.27

1 each

5210.80

1 rm

1467.00

14.67

14760.40

337269598.xlsx - data-WS & Sewer (2)

Page 2137 of 3205

95.50

Rs

14855.90
2022.63
16878.53
168.79
0.00
168.79

337269598.xlsx - data-WS & Sewer (2)

Page 2138 of 3205

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

957.60
2025.00
4876.80
921.60
8781.00

151.39

1 each

6055.60

1 rm

1712.00

17.12

16548.60
104.93

Rs

16653.53
2267.38
18920.91
189.21
0.00
189.21

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

1058.40
2205.00
5337.60
1113.60
9714.60

166.65

1 each

6666.00

1 rm

1956.00

19.56

18336.60
116.71

Rs

18453.31
2512.42
20965.73
209.66
0.00
209.66

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

1134.00
2362.50
5760.00
1267.20
10523.70

188.95

1 each

7558.00

1 rm

2201.00

22.01

20282.70
337269598.xlsx - data-WS & Sewer (2)

Page 2139 of 3205

127.25

Rs

20409.95
2778.81
23188.76
231.89
0.00
231.89

337269598.xlsx - data-WS & Sewer (2)

Page 2140 of 3205

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

1224.72
2551.50
6220.80
1267.20
11264.22

246.46

1 each

9858.40

1 rm

2445.00

24.45

23567.62
137.09

Rs

23704.71
3227.40
26932.11
269.32
269.32

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

1386.00
2902.50
6259.20
1267.20
11814.90

323.91

1 each

12956.40

29.34

1 rm

2934.00
27705.30
147.49
27852.79
3792.16
31644.95
316.45

321.00

385.00

462.00

1 No

Rs

321.00
43.70
364.70
364.70

Rs

385.00
52.42
437.42
437.42

1 No

1 No

462.00
62.90
524.90
0.00
337269598.xlsx - data-WS & Sewer (2)

Page 2141 of 3205

553.00

Rs

524.90

Rs

553.00
75.29
628.29
0.00
628.29

1 No

m true to alignment and gradient, jointing with rubber rings and


rubber rings as per BIS No. 783/1985 - RCC-NP3

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

882.00
1863.00
4454.40
883.20
8082.60

167.82

1 each

6712.80

1 rm

1467.00

14.67

16262.40
95.50

Rs

16357.90
2227.13
18585.03
185.85
0.00
185.85

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

957.60
2025.00
4876.80
921.60
8781.00

200.69

1 each

8027.60

17.12

1 rm

1712.00
18520.60
104.93
18625.53
2535.87
21161.40
211.61
337269598.xlsx - data-WS & Sewer (2)

Page 2142 of 3205

Rs

0.00
211.61

337269598.xlsx - data-WS & Sewer (2)

Page 2143 of 3205

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

1058.40
2205.00
5337.60
1113.60
9714.60

227.68

1 each

9107.20

19.56

1 rm

1956.00
20777.80
116.71

Rs

20894.51
2844.79
23739.30
237.39
0.00
237.39

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

1134.00
2362.50
5760.00
1267.20
10523.70

258.19

1 each

10327.60

22.01

1 rm

2201.00
23052.30
127.25

Rs

23179.55
3155.90
26335.45
263.35
0.00
263.35

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

1224.72
2551.50
6220.80
1267.20
11264.22

295.75

1 each

11830.00

24.45

1 rm

2445.00
25539.22

337269598.xlsx - data-WS & Sewer (2)

Page 2144 of 3205

137.09

Rs

25676.31
3495.83
29172.14
291.72
0.00
291.72

337269598.xlsx - data-WS & Sewer (2)

Page 2145 of 3205

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

1386.00
2902.50
6259.20
1267.20
11814.90

429.54

1 each

17181.60

29.34

1 rm

2934.00
31930.50
147.49

Rs

321.00

1 No

321.00

Rs

385.00

1 No

1 No

52.42
437.42
0.00
437.42

462.00

Rs

553.00

43.70
364.70
0.00
364.70

385.00

Rs

462.00

32077.99
4367.42
36445.41
364.45
0.00
364.45

1 No

62.90
524.90
0.00
524.90

553.00

Rs

75.29
628.29
0.00
628.29

337269598.xlsx - data-WS & Sewer (2)

Page 2146 of 3205

d frames anywhere in A.P., F.O.R. destination including, loading,


other Govt levies etc., as applicable.ISI mark

1543.00

1 each

1543.00
192.88
77.15
1813.05
210.08
2023.15
0.00
2023.15

1989.00

1 each

1989.00
248.63
99.45
2337.10
270.80
2607.90
0.00
2607.90

2133.00

1 each

2133.00
266.63
106.65
2506.30
290.41
2796.75
0.00
2796.75

2286.00

1 each

2286.00
285.75
114.30
2686.05
311.24
2997.30
0.00
2997.30

psulated plastic steps for man holes anywhere in A.P. including


ading and stacking at site of work etc, complete but excluding

166.00

1 each

Rs

166.00
20.75
8.30
195.05
22.60
217.65
0.00
217.65

eyance etc
123.00

1 Kg

123.00
16.75
139.75
0.00
139.75
337269598.xlsx - data-WS & Sewer (2)

Page 2147 of 3205

337269598.xlsx - data-WS & Sewer (2)

Page 2148 of 3205

I make conforming to ISI 651 & 4127 with airtight cement joints
l (except rock requiring blasting) up to 914.4 mm (3'0") depth
408.00

1 Rmt

216.00

408.00
43.20
451.20
61.43
512.63
512.65
0.00
512.65

ber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop


shing strength of 10 N/sq.mm including plastering with cement
covers and frames including excavating pits up to a depth of
:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
ost and conveyance of all materials like cement, sand, bricks,
l and operational, labour charges like mixing cement mortar,
per Standard specification.

6530.00

Each

6530.00
889.06
7419.06
7419.10
0.00
7419.10

ber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop


shing strength of 10 N/sq.mm including plastering with cement
covers and frames including excavating pits up to a depth of
1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
ost and conveyance of all materials like cement, sand, bricks,
l and operational, labour charges like mixing cement mortar,
per Standard specification.

10218.00

Each

10218.00
1391.18
11609.18
11609.20
0.00
11609.20

per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using


ushing strength of 5 N/sq.mm including plastering with cement
overs and frames including excavating pits up to a depth of 904
0 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching
veyance of all materials like cement, sand, bricks, water etc., to
onal, labour charges like mixing cement mortar, constructing
specification.

6237.00

Each

6237.00
337269598.xlsx - data-WS & Sewer (2)

Page 2149 of 3205

849.17
7086.17
7086.20
0.00
7086.20

per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using


ushing strength of 5 N/sq.mm including plastering with cement
covers and frames including excavating pits up to a depth of
1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
ost and conveyance of all materials like cement, sand, bricks,
l and operational, labour charges like mixing cement mortar,
per Standard specification.

9651.00

Each

9651.00
1313.98
10964.98
10965.00
0.00
10965.00

using 19.05 mm gauge graded granite metal chips and cradling

217.00
49.00

1 Rmt

217.00
9.80
226.80
30.88
257.68
257.70
0.00
257.70

orresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
o. 402)with minimum cement content as per IS code . for

5.74
1684.81
791.93
504.00
450.00
384.00
338.60
175.40
103.00

1 Kg
1 Cum
1 Cum
1 Each
1 Each
1 Each
1 hour
1 hour
1 Kl
Rs

6722.96
277.00

1 Cum
1 Cum

2296.00
1347.85
316.77
67.03
120.15
1766.40
451.35
233.81
123.60
6722.96

6722.96
277.00
337269598.xlsx - data-WS & Sewer (2)

Page 2150 of 3205

446.00

1 Cum

Rs

446.00
89.20
7535.16
1054.92
8590.08
0.00
8590.08

orresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
with minimum cement content as per IS code for COLUMNS,

5.74
1684.81
791.93
504.00
450.00
384.00
338.60

1 Kg
1 Cum
1 Cum
1 Each
1 Each
1 Each
1 hour

2296.00
1347.85
316.77
84.17
75.15
2150.40
451.35

175.40

1 hour

233.81

103.00

1 Kl

123.60
Rs

7079.10

337269598.xlsx - data-WS & Sewer (2)

Page 2151 of 3205

7079.10
341.00

1 Cum
1 Cum

7079.10
341.00

1603.00

1 Cum

1603.00

Rs

Rs

7079.10
876.00

1 Cum
1 Sqm

7079.10
2917.08
Rs

Rs

7079.10
876.00

1 Cum
1 Sqm

9996.18
1360.98
11357.16
11357.16

7079.10
3504.00
Rs

Rs

7079.10
1115.00

320.60
9343.70
1272.14
10615.84
0.00
10615.84

1 Cum
1 Sqm

10583.10
1440.89
12023.99
12023.99

7079.10
6366.65
Rs

Rs

13445.75
1830.64
15276.39
15276.39

337269598.xlsx - data-WS & Sewer (2)

Page 2152 of 3205

7079.10
1115.00

1 Cum
1 Sqm

7079.10
6199.40
Rs

Rs

7079.10
1115.00

1 Cum
1 Sqm

7079.10
4950.60
Rs

Rs

7079.10
1115.00

13278.50
1807.87
15086.37
15086.37

1 Cum
1 Sqm

12029.70
1637.84
13667.54
0.00
13667.54

7079.10
4460.00
Rs

Rs

11539.10
1571.05
13110.15
0.00
13110.15

rresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
)with minimum cement content as per IS code from standard
ing concrete, vibrating, curing etc. complete but excluding cost
MS

5.74
1684.81
791.93
504.00
450.00
384.00
338.60
175.40
103.00

1 Kg
1 Cum
1 Cum
1 No
1 No
1 No
1 hour
1 hour
1 Kl
Rs

5517.72

1 Cum

2296.00
1347.85
316.77
33.77
59.85
1181.57
104.29
54.02
123.60
5517.72

5517.72
337269598.xlsx - data-WS & Sewer (2)

Page 2153 of 3205

227.00
152.00

1 Sqm
1 Sqm
Rs

2270.00
1520.00
304.00
9611.72
1308.64
10920.36
0.00

Rs

10920.36

337269598.xlsx - data-WS & Sewer (2)

Page 2154 of 3205

5517.72
227.00
152.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

5517.72
3681.00
2471.00

1 Cum
1 Cum
1 Sqm
Rs

Rs

5517.72
6632.00
3911.00

1 Cum
1 Cum
1 Sqm
Rs

Rs

5517.72
2002.00
1344.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5517.72
3607.00
2127.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5517.72
1514.09
1013.84
202.77
8248.42
1123.02
9371.44
0.00
9371.44

5517.72
3681.00
2471.00
494.20
12163.92
1656.12
13820.04
0.00
13820.04

5517.72
6632.00
3911.00
782.20
16842.92
2293.16
19136.08
19136.08

5517.72
2002.00
1344.00
268.80
9132.52
1243.39
10375.91
0.00
10375.91

5517.72
3607.00
2127.00
425.40
11677.12
1589.84
13266.96
0.00
13266.96

f slab incuding labour charges for fixing and all incidental and

337269598.xlsx - data-WS & Sewer (2)

Page 2155 of 3205

80.530

1 Kg

80.53

Rs

Rs

80.53
10.96
91.49
0.00
91.49

MS angles 2 nos verticals and horizontals fixed at 25 cm c/c as


oth sides with anti corrosive paint two coats over one coat of
e, all taxex and duties, fixing in position duly embodying in CC
ished item of work.

38.00

1 kg

2319.90

22.00

1 Kg

1343.10
268.62

476.56

10 Sqm

138.20
4069.82
0.00
4069.82
Rs.
Rs.

1017.46
1017.46
66.66

g to IS:1729-1979 of reputed make with cement caulked joints


xing with in cement mortar (1:1) and including fixing of M.S.
rth work excavation and refilling etc for Out let arrangement.

1841.00

1 Rmt

139.78

1 Cum

1841.00
28.31
1869.31
1869.31
261.70
2131.01
0.00
2131.01

of material and labour charges etc., complete for fixing it to the


484.00

3 Rmt

161.33

161.33
19.00
18.00
65.00

1 Rmt
1 Each
1 Each
1 Rmt

2419.95
19.00
180.00
975.00

337269598.xlsx - data-WS & Sewer (2)

Page 2156 of 3205

195.00
3788.95
252.60
34.39
286.99
0.00
286.99

337269598.xlsx - data-WS & Sewer (2)

Page 2157 of 3205

t concrete nominal mix M-20 prop (Cement : fine aggregate:


etal including cost and conveyance of all materials like cement,
bour charges , for mixing , laying, concrete , ramming in 15 cm
em of work with nomonal reinforcement

5.74
1563.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

1894.20
1407.43
356.37
123.60

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
4704.36
640.50
5344.86
0.00
5344.86

Rs

Rs

5344.86
160.00
36.00

5344.86
160.00
36.00

1 Cum
1 Cum

272.59
11.68

1 Kg

1 Cum
1 Cum
1 Kg

Rs.

Rs

105.12
389.39
0.00

Rs

389.39

801.73
32.00
270.00
1103.73
0.00
1103.73

crete nominal mix M-20 prop (Cement : fine aggregate: coarse


uding cost and conveyance of all materials like cement, sand,
ur charges , for mixing , laying, concrete , ramming in layers,
nal reinforcement

5.74

1 Kg

1894.20

1684.81
791.93
103.00

1 Cum
1 Cum
1 Kl

1516.33
356.37
123.60

338.60

1 hour

338.60
337269598.xlsx - data-WS & Sewer (2)

Page 2158 of 3205

504.00
384.00

1 Nos
1 Nos
Rs

Rs

5468.59
160.00
36.00

4704.36
876.00

1 Cum
1 Cum
1 Kg
Rs.

196.87
5.76
97.20
299.83
299.83

1 Cum
1 Sqm

4704.36
4380.00
Rs

Rs

4704.36
876.00

50.40
533.76
4813.26
655.33
5468.59
0.00
5468.59

1 Cum
1 Sqm

9084.36
1271.81
10356.17
0.00
10356.17

4704.36
3504.00
Rs

Rs

8208.36
1149.17
9357.53
0.00
9357.53

and conveyance, packing, farwarding, transit risk etc.complete


103.00

1 Kg

Rs

103.00
14.42
0.00
117.42

ecification including cost and conveyance, packing, farwarding,


123.00

1 Kg

85.00
11.90
0.00
Rs

96.90

337269598.xlsx - data-WS & Sewer (2)

Page 2159 of 3205

n all soils under water including all leads, lifts, shoring, strutting,
pipe line work.

Cum
11671.00

Cum
16717.00

Cum
25092.00

10 Cum

Rs

11671.00
1633.94
13304.94
1330.49
0.00
1330.49

Rs

16717.00
2340.38
19057.38
1905.74
0.00
1905.74

Rs

25092.00
3512.88
28604.88
2860.49
0.00
2860.49

Rs

25092.00
4794.00
29886.00
4184.04
34070.04
3407.00
0.00
3407.00

Rs

25092.00
9588.00
34680.00
4855.2
39535.20
3953.52
0.00
3953.52

10 Cum

10 Cum

m
25092.00
4794.00

10 Cum
1 Mts

m
25092.00
4794.00

1 Cum
1 Mts

m
25092.00
4794.00

1 Cum
1 Mts

25092.00
14382.00
39474.00
5526.36
45000.36
4500.04
0.00
337269598.xlsx - data-WS & Sewer (2)

Page 2160 of 3205

Rs

4500.04

337269598.xlsx - data-WS & Sewer (2)

Page 2161 of 3205

m
25092.00
4794.00

1 Cum
1 Mts

Rs

25092.00
19176.00
44268.00
6197.52
50465.52
5046.55
0.00
5046.55

Rs

25092.00
23970.00
49062.00
6868.68
55930.68
5593.07
0.00
5593.07

m
25092.00
4794.00

1 Cum
1 Mts

inting with cement fillets and all other incidental charges for
sonably dry to facilitate the work excluding cost of perforated

36.00

36.00

36.00

1 Rmt

Rs

432.00
60.48
492.48
0.00
492.48

Rs

864.00
120.96
984.96
0.00
984.96

1 Rmt

1 Rmt

1008.00
141.12
1149.12
0.00
Rs

1149.12

alignment and gradient, jointing RCC pipes with cement joints


n etc., and testing including filling with water with a water lead

36.00

1 Rmt

Rs
36.00

1 Rmt

432.00
60.48
492.48
0.00
492.48
864.00
120.96
337269598.xlsx - data-WS & Sewer (2)

Page 2162 of 3205

Rs
36.00

1 Rmt

984.96
0.00
984.96
1008.00
141.12
1149.12
0.00

Rs

1149.12

rry to work site and stacking at work site to Dept. gauge for
arges etc. complete as per standard specifications.
Cum
1489.81

1 Cum

8938.86

450.00
384.00

1 Nos
1 Nos

0.00
119.04
9057.90
1233.23
10410.17
1735.03
1735.03

quarry to work site and stacking at work site to Dept. gauge for
arges etc. complete as per standard specifications.
Cum
1854.81

1 Cum

11128.86

450.00
384.00

1 Nos
1 Nos

0.00
119.04
11247.90
1531.4
12898.34
2149.72
2149.72

uarry to work site and stacking at work site to Dept. gauge for
arges etc. complete as per standard specifications.
Cum
1519.81

1 Cum

450.00
384.00

1 Nos
1 Nos

9118.86
0.00
119.04
9237.90
1257.74
10614.68
1769.11
1769.11

arry to work site and stacking at work site to Dept. gauge for
arges etc. complete as per standard specifications.

337269598.xlsx - data-WS & Sewer (2)

Page 2163 of 3205

Cum
641.93

1 Cum

3851.58

450.00
384.00

1 Nos
1 Nos

0.00
119.04
3970.62
540.6
4630.26
771.71
0.00
771.71

337269598.xlsx - data-WS & Sewer (2)

Page 2164 of 3205

ry to work site and stacking at work site to Dept. gauge for


arges etc. complete as per standard specifications.
Cum
791.93

1 Cum

4751.58

450.00
384.00

1 Nos
1 Nos

0.00
119.04
4870.62
663.13
5652.79
942.13
0.00
942.13

rry to work site and stacking at work site to Dept. gauge for
arges etc. complete as per standard specifications.
Cum
989.81

1 Cum

5938.86

450.00
384.00

1 Nos
1 Nos

0.00
119.04
6057.90
824.78
7001.72
1166.95
0.00
1166.95

ain Cement concrete nominal mix (1:4:8) prop (Cement : fine


etal including cost and conveyance of all materials like cement,
bour charges , for mixing , laying, concrete , ramming in 15 cm
m of work.for foundation and under flooring bed.

5.740
1311.81

1 Kg
1 Cum

929.88
1180.63

791.93
103.00

1 Cum
1 Kl

356.37
123.60
2590.48

338.60

1 hour

338.60
338.60

504.00

1 Nos

50.40

384.00

1 Nos

533.76
584.16
3513.24
478.33
3991.57

Rs
Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2165 of 3205

Rs

0.00
3991.57

337269598.xlsx - data-WS & Sewer (2)

Page 2166 of 3205

3513.24
41.00

Delift
charges
Rs. 41
3554.24

1 Cum
1 Cum

3513.24
41.00

OH& CP @ VAT & LC


14%

Total

0%

483.91

0.0

4038.15

3595.24

489.49

0.0

4084.73

3636.24

495.07

0.0

4131.31

3677.24

500.66

0.0

4177.90

3718.24

506.24

0.0

4224.48

3759.24

511.82

0.0

4271.06

3800.24

517.40

0.0

4317.64

3841.24

522.98

0.0

4364.22

3882.24

528.57

0.0

4410.81

3923.24

534.15

0.0

4457.39

3964.24

539.73

0.0

4503.97

4005.24

545.31

0.0

4550.55

4046.24

550.90

0.0

4597.14

4087.24

556.48

0.0

4643.72

4128.24

562.06

0.0

4690.30

4169.24

567.64

0.0

4736.88

4210.24

573.22

0.0

4783.46

orresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
o. 402)with minimum cement content as per IS code . for

5.74
1684.81
791.93

1 Kg
1 Cum
1 Cum

2296.00
1347.85
316.77
3960.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

67.03
120.15
1766.40
1953.58

338.60

1 hour

451.35

175.40

1 hour

233.81
685.16
337269598.xlsx - data-WS & Sewer (2)

Page 2167 of 3205

103.00

1 Kl

123.60
Rs

6722.96

337269598.xlsx - data-WS & Sewer (2)

Page 2168 of 3205

6722.96
277.00
446.00

1 Cum
1 Cum
1 Cum

Rs

7535.16
41.00

1 Cum
1 Cum

OH& CP @ VAT & LC


Delift
charges
14%
0%
Rs. 41
7576.16
1031.49
0.0
7617.16
1037.08
0.0
7658.16
1042.66
0.0
7699.16
1048.24
0.0
7740.16
1053.82
0.0
7781.16
1059.40
0.0
7822.16
1064.99
0.0
7863.16
1070.57
0.0
7904.16
1076.15
0.0
7945.16
1081.73
0.0
7986.16
1087.32
0.0
8027.16
1092.90
0.0
8068.16
1098.48
0.0
8109.16
1104.06
0.0
8150.16
1109.64
0.0
8191.16
1115.23
0.0
8232.16
1120.81
0.0

6722.96
277.00
446.00
89.20
7535.16
1025.91
8561.07
0.00
8561.07

7535.16
41.00

Total

8607.65
8654.24
8700.82
8747.40
8793.98
8840.56
8887.15
8933.73
8980.31
9026.89
9073.48
9120.06
9166.64
9213.22
9259.80
9306.39
9352.97

orresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
with minimum cement content as per IS code for COLUMNS,

5.74
1684.81
791.93

1 Kg
1 Cum
1 Cum

2296.00
1347.85
316.77
3960.62

504.00

1 Each

84.17
337269598.xlsx - data-WS & Sewer (2)

Page 2169 of 3205

450.00
384.00

1 Each
1 Each

75.15
2150.40
2309.72

338.60
175.40

1 hour
1 hour

103.00

1 Kl

451.35
233.81
685.16
123.60
7079.10

Rs

7079.10
1115.00

1 Cum
1 Sqm

7079.10
2475.30
Rs

Rs

9554.40
1300.83
10855.23
10855.23

round Level
9554.40
41.00

1 Cum
1 Cum

OH& CP @ VAT & LC


Delift
charges
14%
0%
Rs. 41
10251.40
1395.73
0.0
10210.40
1390.15
0.0
10169.40
1384.56
0.0
10128.40
1378.98
0.0
10087.40
1373.40
0.0
10046.40
1367.82
0.0
10005.40
1362.24
0.0
9964.40
1356.65
0.0
9923.40
1351.07
0.0
9882.40
1345.49
0.0
9841.40
1339.91
0.0
9800.40
1334.32
0.0
9759.40
1328.74
0.0
9718.40
1323.16
0.0
9677.40
1317.58
0.0
9636.40
1312.00
0.0
9595.40
1306.41
0.0

9554.40
41.00

Total

11647.13
11600.55
11553.96
11507.38
11460.80
11414.22
11367.64
11321.05
11274.47
11227.89
11181.31
11134.72
11088.14
11041.56
10994.98
10948.40
10901.81

und Level
9554.40
134.00

1 Cum
1 Cum

9554.40
134.00

337269598.xlsx - data-WS & Sewer (2)

Page 2170 of 3205

Lift charges

Rs. 134
9688.40
9822.40
9956.40
10090.40
10224.40
10358.40
10492.40
10626.40
10760.40
10894.40
11028.40
11162.40
11296.40
11430.40
11564.40
11698.40
11832.40

OH& CP @ VAT & LC


14%

0%

1319.08
1337.32
1355.56
1373.81
1392.05
1410.30
1428.54
1446.78
1465.03
1483.27
1501.52
1519.76
1538.00
1556.25
1574.49
1592.74
1610.98

7079.10
1115.00

Total

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

1 Cum
1 Sqm

11007.48
11159.72
11311.96
11464.21
11616.45
11768.70
11920.94
12073.18
12225.43
12377.67
12529.92
12682.16
12834.40
12986.65
13138.89
13291.14
13443.38

7079.10
4460.00
Rs
Rs

11539.10
1571.05
26220.30

round Level
11539.10
41.00

1 Cum
1 Cum

11539.10
41.00

Delift charges OH& CP @ VAT & LC

Rs. 41
11580.10
11621.10
11662.10
11703.10
11744.10
11785.10
11826.10
11867.10
11908.10
11949.10
11990.10
12031.10
12072.10
12113.10
12154.10
12195.10
12236.10

14%

1576.63
1582.21
1587.79
1593.38
1598.96
1604.54
1610.12
1615.71
1621.29
1626.87
1632.45
1638.03
1643.62
1649.20
1654.78
1660.36
1665.95

Total

0%

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

13156.73
13203.31
13249.89
13296.48
13343.06
13389.64
13436.22
13482.81
13529.39
13575.97
13622.55
13669.13
13715.72
13762.30
13808.88
13855.46
13902.05
337269598.xlsx - data-WS & Sewer (2)

Page 2171 of 3205

und Level
11539.10
134.00

Lift charges

Rs. 134
11673.10
11807.10
11941.10
12075.10
12209.10
12343.10
12477.10
12611.10
12745.10
12879.10
13013.10
13147.10
13281.10
13415.10
13549.10
13683.10
13817.10

1 Cum
1 Cum

11539.10
134.00

OH& CP @ VAT & LC


14%

Total

0%

1589.29
1607.54
1625.78
1644.02
1662.27
1680.51
1698.76
1717.00
1735.25
1753.49
1771.73
1789.98
1808.22
1826.47
1844.71
1862.95
1881.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

13262.39
13414.64
13566.88
13719.12
13871.37
14023.61
14175.86
14328.10
14480.35
14632.59
14784.83
14937.08
15089.32
15241.57
15393.81
15546.05
15698.30

rresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
)with minimum cement content as per IS code from standard
ing concrete, vibrating, curing etc. complete but excluding cost
MS

5.74
1684.81
791.93

504.00
450.00
384.00

1 Kg

2296.00

1 Cum
1 Cum

1347.85
316.77
3960.62

1 No
1 No
1 No

33.77
59.85
1181.57
1275.19

338.60
175.40

1 hour
1 hour

103.00

1 Kl

104.29
54.02
158.31
123.60
Rs

5517.72
337269598.xlsx - data-WS & Sewer (2)

Page 2172 of 3205

5517.72
227.00
152.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5517.72
227.00
152.00

1 Cum
1 Sqmt.
1 Sqm
Rs

5517.72
409.00
241.00

5517.72
1514.09
1013.84
202.77
8248.42
1123.02
9371.44
0.00
9371.44

5517.72
1135.00
760.00
152.00
7564.72
1029.94
8594.66
0.00

Rs

8594.66

Rs

5517.72
2728.03
1607.47
321.49
10174.71
1385.29
11560.00
0.00
11560.00

1 Cum
1 Sqm
1 Sqm

Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2173 of 3205

5517.72
409.00

1 Cum
1 Sqmt.

5517.72
2045.00

241.00

1 Sqm

1205.00
241.00
9008.72
1226.54
10235.26
0.00

Rs

Rs

10235.26

10174.71
=

73%
73%
73%

Rs

1991.46
1173.45
13339.63
0.00
13339.63

9008.72
=

73%
73%
73%

Rs

5517.72
3260.00

5517.72
3260.00

1 Cum
1 Sqm

1991.46
1173.45
12173.64
0.00
12173.64

5517.72
21744.20
Rs

27261.92
3711.71
30973.63
0.00

Rs

30973.63

1 Cum
1 Sqmt.
Rs

Rs

5517.72
16300.00
21817.72
2970.48
24788.20
0.00
24788.20

337269598.xlsx - data-WS & Sewer (2)

Page 2174 of 3205

orresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
o. 402)with minimum cement content as per IS code . for

5.74
1684.81
791.93

1 Kg
1 Cum
1 Cum

2009.00
1347.85
316.77
3673.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

67.03
120.15
1766.40
1953.58

338.60

1 hour

451.35

175.40

1 hour

103.00

1 Kl

233.81
685.16
123.60
6435.96

Rs
6435.96
277.00
446.00

6435.96
315.00
710.00

6435.96
1335.00
1075.00

1 Cum
1 Cum
1 Cum

6435.96
277.00
446.00
89.20
7248.16
986.84
8235.00
0.00
Rs

8235.00

Rs

6435.96
315.00
710.00
142.00
7602.96
1035.14
8638.10
0.00
8638.10

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

6435.96
1335.00
1075.00
215.00
9060.96
1268.53
337269598.xlsx - data-WS & Sewer (2)

Page 2175 of 3205

10329.49
0
Rs

10329.49
10329.49

orresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
with minimum cement content as per IS code for COLUMNS,

5.74

1 Kg

2009.00

1684.81
791.93

1 Cum
1 Cum

1347.85
316.77
3673.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

84.17
75.15
2150.40
2309.72

338.60

1 hour

451.35

175.40

1 hour

103.00

1 Kl

233.81
685.16
123.60
Rs

6792.10

6792.10
341.00

1 Cum
1 Cum

6792.10
341.00

1603.00

1 Cum

1603.00

Rs

320.60
9056.70
1233.07
10289.77
0.00

Rs

10289.77

10289.77
=

9.30%

9.30%
9.30%

31.71
149.08
10470.56
0.00
Rs

10470.56

337269598.xlsx - data-WS & Sewer (2)

Page 2176 of 3205

10289.77
=

36.6%

36.60%
36.60%

Rs

124.81
586.70
11001.27
0.00
11001.27

337269598.xlsx - data-WS & Sewer (2)

Page 2177 of 3205

6792.10
615.00

1 Cum
1 Cum

6792.10
615.00

2537.00

1 Cum

2537.00
507.40
10451.50
1422.97
11874.47
0.00
Rs

10451.50
=

1 Cum
73.2%

10451.50

73.20%
73.20%

450.18
1857.08
12758.76
2551.75
15310.52
2084.53
17395.05
0.00
Rs

m size

11874.47

17395.05

9.66 Sqm

1.36

6792.10

1 Cum

6792.10

1099.00

1 Sqm

14438.22
Rs

21230.32
2890.51
24120.83
0.00

Rs

m size

9.66 Sqm

24120.83

6792.10

1 Cum

1.36m
6792.10

1099.00

1 Cum

14438.22
1299.44
Rs

22529.76
3154.17
25683.93

Rs

6792.10
1133.00
1141.00

1 Cum
1 Cum
1 Cum
Rs

0.00
25683.93

6792.10
1133.00
1141.00
228.20
9294.30
1301.2
337269598.xlsx - data-WS & Sewer (2)

Page 2178 of 3205

10595.50
0.00
Rs

10595.50
10595.50

337269598.xlsx - data-WS & Sewer (2)

Page 2179 of 3205

6792.10
2042.00
1806.00

1 Cum
1 Cum
1 Cum
Rs

Rs

6792.10
2042.00
1806.00
361.20
11001.30
1540.18
12541.48
0.00
12541.48
12541.48

rresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
)with minimum cement content as per IS code from standard
ing concrete, vibrating, curing etc. complete but excluding cost
MS

5.74
1684.81
791.93

504.00
450.00
384.00

1 Kg
1 Cum
1 Cum

2009.00
1347.85
316.77
3673.62

1 No
1 No
1 No

33.77
59.85
1181.57
1275.19

338.60

1 hour

104.29

175.40

1 hour

103.00

1 Kl

54.02
158.31
123.60
Rs

5230.72
227.00
152.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5230.72

5230.72
1816.00
1216.00
243.20
8505.92
1158.08
9664.00
0.00
9664.00

9664.00
337269598.xlsx - data-WS & Sewer (2)

Page 2180 of 3205

9.3%
9.3%
9.3%

Rs

21.11
14.14
9699.25
0.00
9699.25

337269598.xlsx - data-WS & Sewer (2)

Page 2181 of 3205

9664.00
=

36.7%

36.7%
36.7%

83.31
55.78
9803.09
0.00
Rs

9803.09

9664.00
=

64.0%

64.0%
64.0%

5230.72
409.00
241.00

145.28
97.28
9906.56
0.00
Rs

9906.56

Rs

5230.72
3272.00
1928.00
385.60
10816.32
1472.64
12288.96
0.00
12288.96

1 Cum
1 Sqm
1 Sqm

Rs

5230.72
233.00
157.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5230.72
1330.43
896.47
179.29
7636.91
1039.77
8676.68
0.00
8676.68

8676.68
=

9.30%
9.3%
9.3%

21.67
14.60
8712.95
0.00
Rs

8712.95

8676.68

337269598.xlsx - data-WS & Sewer (2)

Page 2182 of 3205

36.7%

36.7%
36.7%

85.51
57.62
8819.81
0.00
Rs

8819.81

337269598.xlsx - data-WS & Sewer (2)

Page 2183 of 3205

8676.68
=

64%

64.0%
64.0%

5230.72
440.00
259.00

149.12
100.48
8926.28
0.00
Rs

8926.28

Rs

5230.72
2512.40
1478.89
295.78
9517.79
1295.85
10813.64
0.00
10813.64

1 Cum
1 Sqm
1 Sqm

Rs

5230.72
440.00
259.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

5230.72
3260.00

1 Cum
1 Sqm
Rs

Rs

5230.72
3260.00

1 Cum
1 Sqm
Rs

Rs

5230.72
3260.00

1 Cum
1 Sqm

5230.72
2200.00
1295.00
259.00
8984.72
1223.27
10207.99
0.00
10207.99

5230.72
10855.80
16086.52
2190.18
18276.70
0.00
18276.70

5230.72
10855.80
977.02
17063.54
2323.2
19386.74
0.00
19386.74

5230.72
10855.80
1628.37
337269598.xlsx - data-WS & Sewer (2)

Page 2184 of 3205

Rs

17714.89
2411.88
20126.77
0.00

Rs

20126.77

337269598.xlsx - data-WS & Sewer (2)

Page 2185 of 3205

5230.72
3260.00

1 Cum
1 Sqm
Rs

Rs

5230.72
3260.00

1 Cum
1 Sqm

5230.72
27155.80
Rs

Rs

5230.72
3260.00

1 Cum
1 Sqm
Rs

Rs

5230.72
3260.00

1 Cum
1 Sqm
Rs

Rs

5230.72
3681.00
2471.00

1 Cum
1 Cum
1 Sqm

2444.02
34830.54
4742.18
39572.72
0.00
39572.72

5230.72
27155.80
4073.37
36459.89
4964.01
41423.90
0.00
41423.90

5230.72
18614.60
23845.32
3246.54
27091.86
0.00
27091.86

Rs

5230.72
3681.00
2471.00
494.20
11876.92
1617.04
13493.96
0.00
13493.96

Rs

5230.72
6632.00
3911.00
782.20
16555.92

Rs

5230.72
6632.00
3911.00

5230.72
27155.80
32386.52
4409.42
36795.94
0.00
36795.94

1 Cum
1 Cum
1 Sqm

337269598.xlsx - data-WS & Sewer (2)

Page 2186 of 3205

2254.09
18810.01
0.00
Rs

18810.01

337269598.xlsx - data-WS & Sewer (2)

Page 2187 of 3205

5230.72
2002.00
1344.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5230.72
2002.00
1344.00
268.80
8845.52
1204.32
10049.84
0.00
10049.84

10049.84
=

9.3%
9.3%
9.3%

Rs

186.19
124.99
10361.02
0.00
10361.02

10049.84
=

36.7%

36.7%
36.7%

Rs

734.73
493.25
11277.82
0.00
11277.82

10049.84
=

64.0%

64.0%
64.0%

Rs
5230.72
3607.00
2127.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

12940.88
=

1 Cum
73.2%

1281.28
860.16
12191.28
0.00
12191.28
5230.72
3607.00
2127.00
425.40
11390.12
1550.76
12940.88
0.00
12940.88

12940.88

337269598.xlsx - data-WS & Sewer (2)

Page 2188 of 3205

73.2%
73.2%

Rs

2640.32
1556.96
17138.17
0.00
17138.17

337269598.xlsx - data-WS & Sewer (2)

Page 2189 of 3205

12940.88
=

1 Cum
141.5%

12940.88

141.5%
141.5%

Rs
m size

9.66 Sqm

5103.91
3009.71
21054.49
0.00
21054.49

12940.88

1 Cum

1.36m
12940.88

1099.00

1 Cum

14438.22
Rs

27379.10
3833.07
31212.17

Rs
m size

9.66 Sqm

0.00
31212.17

12940.88

1 Cum

1.36m
12940.88

1099.00

1 Cum

14438.22
1299.44
Rs

28678.54
4015.00

Rs

5230.72
224.00
175.00

1 Cum
1 Sqm
1 Sqm
Rs
Rs

Rs

5230.72
403.00
278.00

1 Cum
1 Sqm
1 Sqm
Rs
Rs

Rs

32693.54
0.00
32693.54

326.92
224.00
175.00
35.00
760.92
103.6
864.52
0.00
864.52
864.52

326.92
403.00
278.00
55.60
1063.52
144.8
1208.32
0.00
1208.32
1208.32
337269598.xlsx - data-WS & Sewer (2)

Page 2190 of 3205

337269598.xlsx - data-WS & Sewer (2)

Page 2191 of 3205

bit wire mesh & nominal reinforcement as directed by Engineerrials to site, seigniorage charges, sales & other taxes on all
er to work site, centering, scaffolding and form work, lift charges
harges, for finished item of work. (APSS No.403 & 903)

17.00

1 sqm

226.10

3733.88
5.74
1231.12

1 cum
1 kg
10 sqm

933.47
287.00
2683.84

504.00
504.00
384.00

1 day
1 day
1 day

4032.00
504.00
3840.00

338.60

1 Hrs

677.20
Rs

Rs
Rs

13183.61
1794.95
14978.56
1497.86
0.00
1497.86

ulphate Resistant Cementm finished smooth including cost and


hing, curing, scaffolding and all operational, incidental, labour
hed item of work. (As per SS 903). per 10 Sqm.

3733.88

1 Cum

560.08

504.00
384.00

1 Nos
1 Nos

302.40
368.64
1231.12
167.62
1398.74
0.00
1398.74

Rs
3F

4F

5F

1398.74

1398.74

1398.74

9.90

9.90

9.90

107.40

131.80

156.10

21.48

26.36

31.22

58.70

88.05

117.40

1596.22

1654.85

1713.36

337269598.xlsx - data-WS & Sewer (2)

Page 2192 of 3205

ick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with
Sand , Water, etc., to site, seigniorage charges, all operational,
s, curing , including cutting grooves where ever necessary etc.,

5.74
858.93

1 Kg
1 Cum

246.82
154.61

5.74
858.93

1 Kg
1 Cum

83.23
34.36

504.00
450.00
384.00

1 day
1 day
1 day

Rs
3F

4F

317.52
661.50
1497.60
2995.64
0.00
2995.64
0.00
2995.64

5F

2995.64

2995.64

2995.64

9.90

9.90

9.90

107.40

131.80

156.10

21.48

26.36

31.22

58.70

88.05

117.40

3193.12

3251.75

3310.26

smooth including cost and conveyance of all materials to site,


onal, incidental, labour charges etc., including cutting grooves
10 Sqm.

3733.88

1 Cum

504.00
384.00

1 Nos
1 Nos

784.11

Rs
3F

4F

473.76
61.44
1319.31
179.62
1498.93
0.00
1498.93

5F

1498.93
9.90

1498.93
9.90

1498.93
9.90

58.70
11.74
58.70

58.70
11.74
88.05

58.70
11.74
117.40

1637.97

1667.32

1696.67

337269598.xlsx - data-WS & Sewer (2)

Page 2193 of 3205

f slab incuding labour charges for fixing and all incidental and
80.530

1 Kg

80.53

Rs
Rs

80.53
80.53

essive strength not less than 20 N / sq mm ) grade cement


ng cost of all materials, machinery, labour, formwork, centering,
nishing, curing etc.,complete for RCC ornamental parapet
ximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height
s and pillars with top edges of kerb and coping chamferred or
cement steel and gate ) with initial lead upto 1 km and all lifts.
CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Rmt
5.74
5.74
1854.81
1519.81
858.93
86.00
218.86

1 kg
1 kg
1 cum
1 cum
1 cum
1 kg
1 sqm

14063.00
200.90
6751.51
2978.83
2645.50
842.80
25168.90
3775.34
30.00
56456.78

338.60
175.40
166.80

1 Hour
1 Hour
1 Hour

2708.80
1403.20
83.40
4195.40

504.00
480.00

1 Day
1 Day

1008.00
480.00

384.00
384.00
384.00
384.00
384.00
384.00
94.14

1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
1 sqm

768.00
3456.00
1536.00
768.00
2688.00
768.00
10826.10
1623.92
23922.02
84574.20
11514.78
96088.98
0.00
96088.98
2669.14

337269598.xlsx - data-WS & Sewer (2)

Page 2194 of 3205

g and technical specifications Clause 1208.2 MORD / 1900 &

38000
38000
38000
90.00

1t
1t
1t
1 kg

111948.00
38380.00
6840.00
13500.00

504.00
384.00
170668

1 day
1 day

15120.00
16435.20
8533.40

170668

1706.68

170668

1706.68

Rs
e may be worked out as per design to be followed

214169.96
29159.24
243329.20
2433.29
0.00
2433.29

ance of all material , labour charges for fabrication and fixing in


38.00

1 Kg

38.00

379.70
20.00

1000 Kg
1 Kg

18.00

1 Kg

0.38
20.00
4.00
18.00
3.60
83.98
11.43
95.41
0.00
95.41

Rs

e 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost &


igniorage charges on all materials, including all labour charges
plete for finished item of work

5.74
4700.00
791.93
504.00
450.00

1 Kg
1000 Nos
1 Cum
1 day.
1 day.

275.52
2406.40
158.39
120.96
252.00
337269598.xlsx - data-WS & Sewer (2)

Page 2195 of 3205

384.00

1 day.
Rs

Rs

725.76
3939.03
536.3
4475.33
0.00
4475.33
4475.33

337269598.xlsx - data-WS & Sewer (2)

Page 2196 of 3205

3F

4F

5F

4475.33

4475.33

4475.33

43.17

43.17

43.17

466.91

572.87

678.78

93.38

114.57

135.76

43.17

64.76

86.35

5121.97

5270.71

5419.39

0" Height including fixing in required position, driving in to the


omplete
73.00

1 No

73.00
15.00
4.00
92.00

including fixing in required position, driving in to the ground up

121.00

25.60

1 No

121.00
24.00
6.00
151.00

1 Each

768.00

768.00
104.56
0.00
872.56

isted deformed steel Anchor rods with 0.75m length driven in to


including cost of all materials, machinary, labour, drilling and
ial lead up to 50m and all lifts.

38.00

1 Kg

900.60

154.00

1 Nos

1540.00

97.00

1 Nos

970.00

588.00
450.00
384.00

1 day
1 day
1 day

294.00
225.00
384.00
4313.60
431.36
0.00

Rs
Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2197 of 3205

Rs

431.36

337269598.xlsx - data-WS & Sewer (2)

Page 2198 of 3205

s below with 6 m lift complete with load chain and hand chain
21841.00

1 No

291.00

1 job

21841.00
291.00

Rs

22132.00
3013
25145.00
0.00
25145.00
25145.00

eening confriming to IS6280 as per drawing) to fit in 45cms


m for coarse screen and 20mm for fine screen . includiong cost
ng fabrication charges etc complete and directed by Engineer 200.00

1 Kg

200.00

111.00

1 Kg

111.00

1 Kg

22.20
4.00

4.00

0.80
338.00
47.32
385.32
0.00
385.32

ions using 20 mm nominal size Graded hard stone aggregate,


curing for 14 days complete as per drawings and technical
H.

5740.00
791.93
2009.81
1579.81

1 MT
1 cum
1 cum
1 cum

2422.28
356.37
1085.30
568.73

504.00
384.00

1 day
1 day

50.40
533.76

338.60
816.80

1 hour
1 hour

135.44
326.72
5479.00
164.37
5643.37
790.07
6433.44
0.00
337269598.xlsx - data-WS & Sewer (2)

Page 2199 of 3205

Rs

6433.44

337269598.xlsx - data-WS & Sewer (2)

Page 2200 of 3205

per metre for Well Foundation complete as per Drawing and

38000.00

1 MT

39900.00

90.00

1 Kg

1800.00

504.00
504.00
504.00
384.00

1 day
1 day
1 day
1 day

2772.00
2772.00
2772.00
6842.88
3990

#REF!
113.80

1 MT
1 hour

#REF!
2276.00
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs

lete as per Drawing and Technical Specification 1200, 1500 &

5479.00

1 cum

5479.00

Rs

1096.00
6575.00
920.50
7495.50
0.00
7495.50

plete as per Drawing and Technical Specification 1200, 1500 &

5479.00

1 cum

5479.00
548.00
6027.00
843.78
6870.78
337269598.xlsx - data-WS & Sewer (2)

Page 2201 of 3205

Rs

0.00
6870.78

337269598.xlsx - data-WS & Sewer (2)

Page 2202 of 3205

plete as per Drawing and Technical Specification 1200, 1500 &

5740.00
791.93
1311.81
2009.81
1579.81
86.00

1 MT
1 cum
1 cum
1 cum
1 cum
1 Kg

36104.60
5345.53
7083.77
10852.97
4265.49
1857.60

504.00
384.00

1 day
1 day

756.00
8025.60

338.60
816.80
422.00

1 hour
1 hour
1 hour

2031.60
4900.80
2532.00
3714.58

Rs

87470.54
12245.88
99716.42
0.00
99716.42
6647.77

plete as per Drawing and Technical Specification 1200, 1500 &

5740.00
791.93
2009.81
1579.81

1 MT
1 cum
1 cum
1 cum

36334.20
5345.53
16279.46
8530.97

0.00
504.00
384.00

1 day
1 day

756.00
8010.24

338.60
816.80

1 hour
1 hour

2031.60
4900.80
82188.80
2465.66
84654.46
11851.62
96506.08
0.00
96506.08
6433.74

Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2203 of 3205

ethod of sinking) through all types of strata namely sandy soil,


nical specifications 1207 MORTH. Depth of sinking is reckoned

504.00
450.00

1 day
1 day

504.00
954.00

2268.00

1 hour

4536.00

Rs

453.60
6447.60
902.66
7350.26
0.00
7350.26

504.00
450.00

1 day
1 day

630.00
1192.50

2268.00

1 hour

6804.00

Rs

1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05

680.4
9306.90
1302.97
10609.87
0.00
10609.87

11140.36
11697.38
12282.25
12896.36
13541.18
14218.24
14929.15
15675.61
16459.39
17282.36

337269598.xlsx - data-WS & Sewer (2)

Page 2204 of 3205

er than pneumatic method of sinking) through all types of strata


er drawing and technical specifications 1207 MORTH. Depth of

504.00
450.00

1 day
1 day

428.40
810.00

2268.00

1 hour

3855.60

Rs

385.56
5479.56
767.14
6246.70
0.00
6246.70

504.00
450.00

1 day
1 day

534.24
1012.50

2268.00

1 hour

5783.40

Rs

1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05

578.34
7908.48
1107.19
9015.67
0.00
9015.67

9466.45
9939.77
10436.76
10958.60
11506.53
12081.86
12685.95
13320.25
13986.26
14685.57

337269598.xlsx - data-WS & Sewer (2)

Page 2205 of 3205

ethod of sinking) through all types of strata namely sandy soil,


nical specifications 1207 MORTH. Depth of sinking is reckoned

504.00
450.00

1 day
1 day

756.00
1431.00

2268.00

1 hour

10206.00

Rs

1020.60
13413.60
1877.90
15291.50
0.00
15291.50

504.00
450.00

1 day
1 day

1008.00
1917.00

2268.00

1 hour

13608.00

438.20

1 hour

1424.15

Rs

1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05

1503.22
19460.37
2724.45
22184.82
0.00
22184.82

23294.06
24458.76
25681.70
26965.79
28314.08
29729.78
31216.27
32777.08
34415.93
36136.73

337269598.xlsx - data-WS & Sewer (2)

Page 2206 of 3205

of 420 kg / cum R.C.C piles excluding reinforcement - 500 mm


the cost of materials, labour and transportation cost @ 1% of
0 & 1700 MORTH

5479.00

54.00
54.00
54.00

1 cum

64542.62

1 Kg
1 Kg
1 Kg

12960.00
5670.00
1620.00

870.00
35420.00

1 hour
1 hour

384.00
302532.6

1 day

5220.00
212520.00

1198.08
3025.33

Rs

306756.03
42945.84
349701.9
5828.36
0.00
5828.36

mplete as per Drawing and Technical Specifications in Section

5740.00
791.93
2009.81
1579.81

1t
1 cum
1 cum
1 cum

29388.80
5345.53
16279.46
8530.97

504.00
384.00
384.00

1 day
1 day
1 day

756.00
8025.60
384.00

338.60
816.80

1 hour
1 hour

2031.60
4900.80
75642.76
3026.00
78668.76
11013.63
337269598.xlsx - data-WS & Sewer (2)

Page 2207 of 3205

Rs

89682.39
0.00
89682.39
5978.83

337269598.xlsx - data-WS & Sewer (2)

Page 2208 of 3205

complete as per drawings and technical specifications Clauses


ver laps and wastage, where they are not welded.

34000.00

1t

70.00

1 kg

504.00
384.00

1 day
1 day

35700.00
420.00

1008.00
2457.60
39585.60
5541.98
45127.58
0.00
45127.58
45.13

Construction of Well Foundation for 8m dia. Well as per Tech.

112.79
25.60

1 cum
1 each

28332.85
19200.00

384.00

1 day

5913.60

3709.00

1 hour

74180.00
127626.45
3190.66
130817.11
18314.40
149131.51

ucket.

location from one pier location to another pier location as per

112.79
25.60

1 cum
1 each

50755.50
7680.00

0.00
384.00

1 day

2396.16

1650.00
909.70

1 hour
1 hour

44550.00
25471.60
130853.26
18319.46
337269598.xlsx - data-WS & Sewer (2)

Page 2209 of 3205

149172.72
4972.42

337269598.xlsx - data-WS & Sewer (2)

Page 2210 of 3205

M.S.Girders including welding, cutting and fabricating the plates


iding and applying 3 coats of anti corrosive paint, etc.complete
63.00
20.00

1 Kg
1 Kg

18.00

1 Kg

184.21

3537.45
1123.00
224.60
1010.70
202.14
368.42
6466.31
905.28
7371.59

1 Sqm

y film thickness each coat to embedded parts / gates with cold


ng surface, cost of all materials, labour, scaffolding etc., all

271.00
30.00

1 ltr

9214.00

1 No

450.00
384.00

1 No
1 No

120.00
933.40
5850.00
2304.00
18421.40
184.21
25.79
210.00

hs, interlocked together through their entire length and jointed


0mm dia nominal bore MS B class pipe with brackets, plates,
utside locking with push-pull operations including cost of hood
ball bearings, all accessories etc complete for finished item of
2861.00

1 Sqm

Rs

2861.00
400.54
3261.54
0.00
3261.54

ESIDENTIAL BUILDINGS WITH GRILL PROVISION) Providing


m thick galvanized as per IS 277 with Zinc of 120 GSM). Primer
of 12-16 microns thick and back coated with 5-7 microns thick
be of 48x50mm, section for shutter should be of 47x20mm and
ave rebate for Glazed shutter and a 20mm provision for Guard
Centre mullion is to be fixed with mullion cap. Seccolor Handle,
r shutter. The windows should be panelled with 5mm thick plain
should be fixed to the concrete/masonry wall by means of self
complete for finished item of work.

uter frame section size of 48x50mm shutter frame section size


5680.00

1 Sqm

5680.00
795.20

Rs

6475.20
0.00
6475.20
337269598.xlsx - data-WS & Sewer (2)

Page 2211 of 3205

uter frame section size of 48x50mm. Shutter frame section size


mm.
5005.00

1 Sqm

5005.00
700.70
5705.70
0.00
5705.70

Rs

d and 10mm MS square bars horizontally at 125mm centre to


holdfasts (2 on each side) duly making cutting brick masonry,
xide primer including and conveyance of all materials ,cutting,
ete for finished item of work.
1.50

2.25 Sqm

3.00
3.00
2.00
8.00 Rmt
1.20 Kg/Rmt

9.60 Kgs

8.00 Rmt
18.00 Rmt
26.00 Rmt
0.78 Kg/Rmt

38.00
38.00
22.00
4.00

20.28 Kgs
29.88 Kgs
1 Kg
1 Kg
1 Kg
1 Kg
Rs.
Rs.

364.80
770.64
657.36
119.52
155.38
2067.70
918.98
69.20

using 6mm to 12 mm size hard granite machine crushed metal


eding 1.50 m x 1.50 m and finishing the top surface to required
nt, metal, sand and water etc., complete, including seigniorage

1563.81
5740.00
791.93

1 Cum
1 Kg
1 Cum

265.85
688800.00
67.31

504.00
450.00
384.00

1 day
1 day
1 day

630.00
27.00
1152.00
690942.16
6909.42
697851.58
97699.22
795550.80
0.00

Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2212 of 3205

Rs

795550.80

o give an even shade after thoroughly brushing the surface to


terials, labour charges and incidental such as scaffolding, lift
of materials
29.00

1 Kg

34.80
10.00

504.00
384.00

1 day
1 day

55.44
84.48
184.72
0.92
185.64
25.99
211.63
0.00
211.63
21.16

Rs
Rs

337269598.xlsx - data-WS & Sewer (2)

Page 2213 of 3205

1.08 sqm
2.30 m
33.91 kg
25.08 kg
4.23 kg
18.17 kg
1.41 kg
82.80 kg
37.00
38.00
38.00
38.00
37.00

1 Kg
1 Kg
1 Kg
1 Kg
1 Kg

2.50%
100.00
24.00

1 Kg
1 Kg

15%

40 Uses
15%
5%
35.00
78.00

1 No
1 ltr

1254.67
953.04
160.74
690.46
52.17
3111.08
77.78
50.00
1987.2
5226.06
-783.91
4442.15
111.05
16.66
5.55
70.00
15.60
218.86

sqm

576.00
450.00
384.00

1 Kg
1 Kg
1 Kg

2304.00
900.00
3840.00

576.00
450.00
384.00

1 Kg
1 Kg
1 Kg

1152.00
450.00
768.00
9414.00
94.14

337269598.xlsx - data-WS & Sewer (2)

Page 2214 of 3205

r Treatment Plant works

meter for canal, seating of embankment, filter drains / catch


st of all materials, machinery, labour, placing the excavated soil
c., complete with initial lead upto 1 km and all lifts.

Rate

Per

Amount

Cum
0.00
2791.00
909.70

1 Hour
1 Hour

22328.00
43665.60
65993.60

480.00
384.00

1 Day
1 Day

480.00
11520.00
12000.00
77993.60
10618.83
88612.43
95.80

14%

meter for canal, seating of embankment, filter drains / catch


st of all materials, machinery, labour, placing the excavated soil
c., complete with initial lead upto 10m and lift up to 3m.
Cum
0.00
1695.70

1 Hour

13565.60
13565.60

480.00
384.00

1 Day
1 Day

480.00
6528.00
7008.00
20573.60
2801.1
23374.70
53.10

14%

mbankment area in heaps as part of disposal of excavated soil


s sortingout, spreading in layer of 25 cm before compaction,
not less than 98 percent or as stipulated by sheep's foot / pad

Cum
22.00

1 Cum

13200.00

2540.90
193.40
865.50
2609.10

1 Hour
1 Hour
1 Hour
1 Hour

9147.24
580.20
4327.50
19046.43
60.00
33161.37
337269598.xlsx - data-WS & Sewer (2)

Page 2215 of 3205

480.00

1 Day

480.00

384.00

1 Day

1536.00
2016.00
48377.37
6586.58
54963.95
91.60

14%

337269598.xlsx - data-WS & Sewer (2)

Page 2216 of 3205

oil from approved borrow area including spreading soil in layers


control of not less than 98 percent or as stipulated, dressing to

Cum
22.00

1 Cum

8668.00

1695.70
2540.90
909.70
193.40
865.50
1101.00

1 Hour
1 Hour
1 Hour
1 Hour
1 Hour
1 Hour

13565.60
7622.70
21832.80
773.60
3462.00
12661.50

59918.20
480.00

1 Day

960.00

384.00

1 Day

14592.00
15552.00
84138.20
11455.42
95593.62
242.60

14%

g cost of all materials, labour, laying, joining etc., complete with


75 mm thick unscreened sand backing to LDPE sheet.
Sqm
185.00

1 Sqm

50875.00

47.96
641.93

1 Kg
1 Cum

191.84
12036.19
63103.03
0.00

10%
384.00

1 Day

5087.50
2304.00

384.00

1 Day

384.00

14%

7775.50
70878.53
9650.11
80528.64
322.10

337269598.xlsx - data-WS & Sewer (2)

Page 2217 of 3205

g cost of all materials, labour, laying, joining etc., complete with


5 mm thick unscreened sand backing to LDPE sheet.
Sqm
95.00

1 Sqm

26125.00

47.96
641.93

1 Kg
1 Cum

191.84
12036.19
38353.03
0.00

10%
384.00

1 Day

384.00

1 Day

14%

2612.50
2304.00
384.00
5300.50
43653.53
5943.43
49596.96
0.00
49596.96
198.40

mpressive strength not less than 15 N /Sqmm ) grade cement


lining using, vibrating, cylinder type mechanical paver including
on, finishing, forming contraction joints, fixing PVC joint sealing
with initial lead upto 1 Km and all lifts.
Sqm
5.74
1854.81
1519.81
858.93
86.00
45.00
0.87750

1 Kg
1 cum
1 cum
1 cum
1 kg
1 Rm
1 sqm

556.80
1887.30
2250.00
1149.60

1 Hour
1 Hour
1 Hour
1 Hour

151536.00
84876.11
37448.12
34013.63
9081.60
23985.00
702.00
341642.46
4454.40
45295.20
18000.00
9196.80

816.80
1695.70
865.50
193.40

1 Hour
1 Hour
1 Hour
1 Hour

6534.40
3391.40
6924.00
1547.20

1 Day
1 Day
1 Day
1 Day
1 Day
1 Day

95343.40
1008.00
504.00
504.00
576.00
960.00
1920.00

504.00
504.00
504.00
576.00
480.00
384.00

337269598.xlsx - data-WS & Sewer (2)

Page 2218 of 3205

384.00

14%

1 Day

3840.00
9312.00
446297.86
60763.45
507061.31
0.00
507061.31
633.80

337269598.xlsx - data-WS & Sewer (2)

Page 2219 of 3205

mpressive strength not less than 15 N /Sqmm ) grade cement


lining using, vibrating, cylinder type mechanical paver including
on, finishing, forming contraction joints, fixing PVC joint sealing
with initial lead upto 1 Km and all lifts.
Sqm
5.74
1854.81
1519.81

1 Kg
1 cum
1 cum

145474.56
81481.80
35943.51

858.93
86.00
45.00

1 cum
1 kg
1 Rm

32656.52
8718.68
28800.00

0.87750

1 sqm

556.80
1887.30
2250.00
1149.60

1 Hour
1 Hour
1 Hour
1 Hour

842.40
333917.47
4454.40
45295.20
18000.00
9196.80

816.80
1695.70
865.50
193.40

1 Hour
1 Hour
1 Hour
1 Hour

6534.40
3391.40
6924.00
1547.20

504.00
504.00
504.00
576.00
480.00

1 Day
1 Day
1 Day
1 Day
1 Day

95343.40
1008.00
504.00
504.00
576.00
960.00

384.00

1 Day

1920.00

384.00

1 Day

3840.00

14%

9312.00
438572.87
59711.7
498284.57
0.00
498284.57
519.00

337269598.xlsx - data-WS & Sewer (2)

Page 2220 of 3205

mpressive strength not less than 15 N /Sqmm ) grade cement


lining using, vibrating, cylinder type mechanical paver including
on, finishing, forming contraction joints, fixing PVC joint sealing
with initial lead upto 1 Km and all lifts.
Sqm
5.74
1854.81
1519.81

1 Kg
1 cum
1 cum

136382.40
76388.50
33703.31

858.93
86.00
45.00

1 cum
1 kg
1 Rm

30612.27
8173.44
28800.00

0.878

1 sqm

842.40

556.80
1887.30
2250.00
1149.60

1 Hour
1 Hour
1 Hour
1 Hour

314902.32
4454.40
45295.20
18000.00
9196.80

816.80
1695.70
865.50
193.40

1 Hour
1 Hour
1 Hour
1 Hour

504.00

1 Day

6534.40
3391.40
6924.00
1547.20
95343.40
1008.00

504.00
504.00
576.00
480.00
384.00

1 Day
1 Day
1 Day
1 Day
1 Day

504.00
504.00
576.00
960.00
1920.00

384.00

1 Day

3840.00
9312.00
419557.72
57122.78
476680.50
0.00
476680.50
496.50

14%

ne chips from approved source including cost of all materials,


equired slopes etc., complete with initial lead upto 50 m and all
Cum
896.81
306.76
30.00

1 Cum
1 cum
1

480.00

1 Day

450.00
384.00

1 Day
1 Day

14%

89681.00
4601.40
60.00
94342.40
480.00
3150.00
7296.00
10926.00
105268.40
14332.29
337269598.xlsx - data-WS & Sewer (2)

Page 2221 of 3205

119600.69
0.00
119600.69
1196.00

337269598.xlsx - data-WS & Sewer (2)

Page 2222 of 3205

es of canal including cost of


USING SAND)

all materials ,labour,watering for

Sqm
28.00
641.93

1 sqm
1 cum

528.00

1 Day

384.00

1 Day

14%

2800.00
0.00
2800.00
1056.00
2688.00
3744.00
6544.00
890.97
7434.97
0.00
7434.97
74.30

bars for RCC works including cleaning, straightening, cutting,


welding wherever required including cost of all materials,
Kg
34.00
70.00
30.00
588.00
384.00

1 kg
1 kg

1 Day
1 Day

14%

35700.00
560.00
300.00
36560.00
3528.00
4224.00
7752.00
44312.00
6033.08
50345.08
0.00
50345.08
50.30

n joint filler boards for cement concrete lining of canal including


Rmt
630.00

1 Sqm

450.00
384.00

1 Day
1 Day

14%

6300.00
6300.00
450.00
384.00
834.00
7134.00
971.29
8105.29
0.00
8105.29
81.10

337269598.xlsx - data-WS & Sewer (2)

Page 2223 of 3205

/ contraction joints for concrete lining by mastic filler including


Rmt
46.00
858.93

1 Kg
1 Cum

450.00
384.00

1 Day
1 Day

14%

1610.00
34.36
1644.36
225.00
384.00
609.00
2253.36
306.79
2560.15
0.00
2560.15
25.60

-10 Grade as per drawing and technical specifications Clause


Cum

5740.00
791.93
1489.81
2009.81
1579.81

1t
1 cum
1 cum
1 cum
1 cum

1262.80
356.37
849.19
562.75
78.99

504.00

1 day

50.40

384.00

1 day

533.76

338.60

1 hour

135.44

3829.70
153.19

14%

3982.89
542.27
4525.16
0.00
4525.16
4525.20

lding foundations in loamy, clayey soils like Black cotton soils


signs including all operations, incidental, labour charges, hire
ths and for finished item of work for piles of following diameters

337269598.xlsx - data-WS & Sewer (2)

Page 2224 of 3205

384.00
14%

1 day

201.98
27.50
229.48
0.00
229.48
229.48

lding foundations in loamy, clayey soils like Black cotton soils


signs including all operations, incidental, labour charges, hire
ths and for finished item of work for piles of following diameters

384.00
14%

1 day

242.30
32.99
275.29
0.00
275.29
275.29

orresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
h minimum cement content as per IS code fo FOUNDATIONS,

1854.81

1 Cum

1483.85

791.93

1 Cum

316.77

5.74

1 Kg

2009.00

504.00

1 day.

67.03

450.00

1 day.

120.15

384.00

1 day.

1766.40

338.60

1 hour

451.35

175.40

1 hour

233.81

103.00

1 Kl

123.60

Rs

6571.96
1335.00
1075.00

1 Cum
1 Cum
1 Cum

6571.96
0.00
0.00
6571.96

6571.96
1335.00
1075.00
215.00
337269598.xlsx - data-WS & Sewer (2)

Page 2225 of 3205

Rs

9196.96
1252.17
10449.13
0.00
10449.13

337269598.xlsx - data-WS & Sewer (2)

Page 2226 of 3205

corresponding to IS 456 using WEIGH BATCHER / MIXER with


pproved quarry including cost and conveyance of all materials
ding Seigniorage charges, sales & other taxes on all materials
hine mixing, laying concrete, curing etc.,complete but excluding
with minimum cement content as per IS code for COLUMNS,

1854.81
791.93
5.74

1 cum
1 cum
1 Kgs

1483.85
316.77
2181.20
3981.82

504.00
450.00
384.00

1 day
1 day
1 day

84.17
75.15
2150.40
2309.72

338.60
175.40
103.00

1 hour
1 hour
1 kl

451.35
233.81
123.60
808.76
7100.30
966.71
8067.01
0
8067.01
8067.01

Rs

7100.30
0.00
0.00

1 Cum
1 Cum
1 Cum
Rs

Rs

7100.30
0.00
0.00
0.00
7100.30
966.71
8067.01
0.00
8067.01

in Cement concrete nominal mix (1:5:10) prop (Cement : fine


etal including cost and conveyance of all materials like cement,
bour charges , for mixing , laying, concrete , ramming in 15 cm
m of work.for foundation and under flooring bed.

5.74
1489.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

743.90
1340.83
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
337269598.xlsx - data-WS & Sewer (2)

Page 2227 of 3205

Rs

Rs

3487.46
474.82
0.00
3962.28
3962.28

ze 23x11x7 Cm in Cement Mortor 1:4 Prop including Cost &


igniorage charges on all materials, including all labour charges
plete for finished item of work

5.74
4700.00
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

413.28
2406.40
158.39
2978.07

1 day.
1 day.
1 day.
Rs

Rs

120.96
252.00
725.76
1098.72
4076.79
555.05
0.00
4631.84
4631.84

ate ) using 20mm size Hard Granite Machine Crushed Graded


egate water etc., to site , seigniorage charges on all materials,
p surface to the required level curing etc., complete for finished

5.74
1854.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1669.33
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
4966.26
676.16
0.00
5642.42
5642.42

Rs

Rs

smooth including cost and conveyance of all materials to site,


onal, incidental, labour charges etc., including cutting grooves
10 Sqm.

3733.88

1 Cum

560.08

337269598.xlsx - data-WS & Sewer (2)

Page 2228 of 3205

504.00
384.00

1 day
1 day
Rs

Rs

302.40
368.64
1231.12
167.62
0.00
0.00
1398.74

337269598.xlsx - data-WS & Sewer (2)

Page 2229 of 3205

ding labour charges for lifting and fixing the stone in position at
96.00

1 Sqm

100.80

Rs

20.16
120.96
16.47
137.43
0.00
0.00
137.43

ding, unloading charges, cost & conveyance, dumping, labour

82.70

1 Cum
Rs

82.70

1 Cum

82.70
0.00
82.70
82.70

Rs

0.00
82.70

ing hire charges, fuel charges and wages for Driver and Helper
53.00

1 Hp.hr

53.00
Rs

53.00
7.22
0.00

Rs

60.22

ations using 20 mm & 10mm nominal size/ Graded hard stone


n including curing for 14 days complete as per drawings and
00 MORTH.
Cum

5740.00
791.93
2009.81
1579.81

1t
1 cum
1 cum
1 cum

1991.78
356.37
1085.30
568.73

504.00
384.00

1 day
1 day

50.40
533.76

338.60
816.80

1 hr/cum
1 hour

0%
14%

135.44
326.72
5048.50
0
5048.50
687.35
5735.85
337269598.xlsx - data-WS & Sewer (2)

Page 2230 of 3205

0.00
0.00
5735.85

337269598.xlsx - data-WS & Sewer (2)

Page 2231 of 3205

ations using 20 mm & 10mm nominal size/ Graded hard stone


n including curing for 14 days complete as per drawings and
00 MORTH. ( With Form work)
Cum

5740.00
791.93
2009.81
1579.81

1t
1 cum
1 cum
1 cum

1991.78
356.37
1085.30
568.73

504.00
384.00
0.00
338.60
816.80

1 day
1 day

50.40
533.76

1 hr/cum
1 hour

4%
14%

135.44
326.72
5048.50
201.94
5250.44
714.85
5965.29
0.00
5965.29

WEIGH BATCHER / MIXER with 20mm size graded machine


st and conveyance of all materials like cement, fine aggregate
sales & other taxes on all materials including all operational,
oncrete by tremmy, curing etc., complete but excluding cost of
nimum cement content as per IS code from standard suppliers
complete but excluding cost of steel and its fabrication charges

nder ream bulbs

5740.00
2009.81
791.93
103.00

1 MT
1 cum
1 cum
1 kl

2296.00
1607.85
316.77
123.60

504.00
450.00
384.00

1 hour
1 hour
1 day

50.40
90.00
1324.80

338.60

1 day

338.60
6148.02
837.05
0.00
0.00
6985.07

14%

337269598.xlsx - data-WS & Sewer (2)

Page 2232 of 3205

.I.S. 458/2003 ex-Factory, ( Rate per Meter of effective length)


ete.

479.00

1 Rmt

479.00

4000.00
5740.00
18.79
41000.00
36000.00
-7.85

489.94
4.20
0.13

4.20
0.65
494.79
66.71
61.24
24.50
0.00
0.00

647.24

ot Pipes confirming to B.I.S. 5382/ 1985 (RATE PER EACH


ng VAT etc.complete.
111.00

1 No

111.00
15.11
13.88
5.55

145.54

504.00
450.00

1 day
1 day

1512.00
1350.00

1200.00

1 days

3600.00

500.00
151.00
500.00
1500.00
57.00

1 Nos
1 RM
1 Ls
1 Each
1 Lts.

25.00
453.00
500.00
150.00
3420.00
11010.00
22.02
0.489
337269598.xlsx - data-WS & Sewer (2)

Page 2233 of 3205

337269598.xlsx - data-WS & Sewer (2)

Page 2234 of 3205

true to alignment and gradient, jointing with rubber rings and


rubber rings as per BIS No. 783/1985

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

882.00
1863.00
4454.40
883.20
8082.60

130.43

1 each

5217.20

1 rm

1467.00

14.67

14766.80
95.50

Rs

inting/ 1 Rmt

14862.30
2023.50
16885.80
168.86
168.86
816.10

h socket spigot ends confirming to I.S.: 8329/2000 in standard


int ( Rubber Gasket D jointing) with cement mortar lining inside
d ST etc,. complete.

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96


3479.00

1 Rmt

3479.00

27500.00
21000.00
-338.08
3140.92
0.66

99.00
3239.92
441.12
392.62
157.05

4230.71

2/85, supply and delivery of rubber gaskets suitable for C.I/ D.I.
with companys standard packing, transportation, unloading &

325.00

1 No

325.00
44.25
40.63
337269598.xlsx - data-WS & Sewer (2)

Page 2235 of 3205

18.28

428.16

337269598.xlsx - data-WS & Sewer (2)

Page 2236 of 3205

h socket spigot ends confirming to I.S.: 8329/2000 in standard


int ( Rubber Gasket D jointing) with cement mortar lining inside
d ST etc,. complete.

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96


4336.00

1 Rmt

4336.00

27500.00
21000.00
-420.89
3915.11
0.88

132.00
4047.11
551.01
489.39
220.23

5307.74

2/85, supply and delivery of rubber gaskets suitable for C.I/ D.I.
with companys standard packing, transportation, unloading &

411.00

1 No

411.00
55.96
51.38
23.12

541.46

h socket spigot ends confirming to I.S.: 8329/2000 in standard


int ( Rubber Gasket D jointing) with cement mortar lining inside
d ST etc,. complete.

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96


5228.00

1 Rmt

5228.00

27500.00
21000.00
-504.88
4723.12
0.99

148.50
4871.62
663.27
590.39
265.68

6390.96

2/85, supply and delivery of rubber gaskets suitable for C.I/ D.I.
with companys standard packing, transportation, unloading &

337269598.xlsx - data-WS & Sewer (2)

Page 2237 of 3205

449.00

1 No

449.00
61.13
56.13
25.26

591.52

h socket spigot ends confirming to I.S.: 8329/2000 in standard


int ( Rubber Gasket D jointing) with cement mortar lining inside
d ST etc,. complete.

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96


6256.00

1 Rmt

6256.00

27500.00
21000.00
-601.29
5654.71
1.21

181.50
5836.21
794.60
706.84
318.08

7655.73

2/85, supply and delivery of rubber gaskets suitable for C.I/ D.I.
with companys standard packing, transportation, unloading &

483.00

1 No

483.00
65.76
60.38
27.17

636.31

h socket spigot ends confirming to I.S.: 8329/2000 in standard


int ( Rubber Gasket D jointing) with cement mortar lining inside
d ST etc,. complete.

P2 = P1+ (R2 - R1)/ 1000 x M x 0.96


7278.00

1 Rmt

7278.00

27500.00
21000.00
-698.88
6579.12
1.43

214.50
6793.62
924.95
822.39
337269598.xlsx - data-WS & Sewer (2)

Page 2238 of 3205

370.08

8911.04

337269598.xlsx - data-WS & Sewer (2)

Page 2239 of 3205

2/85, supply and delivery of rubber gaskets suitable for C.I/ D.I.
with companys standard packing, transportation, unloading &

670.00

1 No

670.00
91.22
83.75
37.69

882.66

576.00
450.00
384.00

1 day
1 day
1 day

58.75
107.10
510.72
676.57
67.66
1.320

with s/s ends carefully into trenches and laying them true to
e of pipes from source of supply (Ref to specifications. BIS
per sub-analysis made for 200 mm dia CI Pipes S/s ends.

1.320

1.320

1.320

1 Kg

Rs

593.56
80.81
674.37
134.87
134.87

Rs

744.48
101.36
845.84
169.17
169.17

Rs

908.60
123.71
1032.31
206.46
206.46

1 Kg

1 Kg

337269598.xlsx - data-WS & Sewer (2)

Page 2240 of 3205

1.320

1 Kg

Rs

1099.12
149.65
1248.77
249.75
249.75

337269598.xlsx - data-WS & Sewer (2)

Page 2241 of 3205

1.320

1 Kg

Rs

1281.28
174.45
1455.73
291.15
291.15

ydralic field test pressure including transportation of Water with

504.00
450.00

1 day
1 day

1512.00
1350.00

1200.00

1 days

3600.00

500.00
151.00
500.00
1500.00
57.00

1 Nos
1 RM
1 Ls
1 Each
1 Lts.

25.00
453.00
500.00
150.00
3420.00
11010.00
22.02
0.489
based on this analysis, for an varities of pipes for various Dia

oint), excluding the cost of the gasket but including all sundries
pressure, etc. complete Reference to specifications IS

450.00
384.00

4.89

1 day
1 day

225.00
384.00
609.00

1 rm

244.50

853.50
8.54

Rs

862.04
120.69
982.73
98.27
98.27

337269598.xlsx - data-WS & Sewer (2)

Page 2242 of 3205

450.00
384.00

7.34

1 day
1 day

225.00
384.00
609.00

1 rm

366.75

975.75
9.76

Rs

985.51
137.97
1123.48
112.35
112.35

mentions as per table. the rates mentioned here under are for
3/ IS 9523/2000) ( ex-works) including transportation, taxes and
88.00

1 Kg

88.00
4.40
12.94
10.88
14.34

130.56

337269598.xlsx - data-WS & Sewer (2)

Page 2243 of 3205

100 mm

:
:
:
:
:

:
:
:
:
:
Total

/ Each

100 Sqm
10 cum
1 cum
11 cum
18.86

cum/hr

3
10
15
3
10
12
53

min
min
min
min
min
min
min

3.77 cum

:
:

11 cum
3 Nos.

:
:
:
:
:
:
:
:

800 sqm
88 cum
45.76 Cum
24.64 cum
39.6 cum
26400 kg
105.6 kg
3 x 3 grid

Rs.
:
Rs.
Rs.
Rs.

533

28080
40000
0.702
0.1755
0.8775

337269598.xlsx - data-WS & Sewer (2)

REC Construction Standard No. A-34/1993 ( APSEB - Data-2013-14- Sheet No.15)


Cost data per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 9.1 Mts.
PSCC Poles at 60 Mts. Span, 75 Kg/sq.Mt wind pressure, working load 140 Kgs.
Sl. No.

Particulars

Qty.

Rate in Rs.

9.1 M PSCC Pole

18

3105

1.07 M Channel / 'V' Cross Arm

18

544

Top Clamp with cleat

16

337

Back Clamp

17

128

Stay Set complete

10

955

Bracing Set with double cross arm

6104

55 Sq.mm AAA Conductor

3.06

28149

11 KV Pin Insulator with Pin

54

95

Strain Insulator with metal parts

12

270

10

Concreting of Pole, Stay sets & Base concreting

11

Misc. Items like coil earthing, pipe eathing, danger, bolts &
nuts, etc
Total Cost of Material
3% storage & handling charges on items (1) to (9)
3% Contingencies on Materials
Labour & Transport
Service Tax at 12.36% on L&T
10% Estt. & Genl. Charges on Materials
Sub-Total
Add Contractors profit @

14%
Sub-Total

Add VAT & Labour cess

0%

Total per 1 Km

Or Say

15

COST SCHEDULE - C-6


11 KV D.P.STRUCTURE ON PCC POLES
(TO BE SUPPLEMENTED TO EVERY 1.6 KMS.OF 11 K.V. LINE)
Sl.No.

Particulars

Unit

Rate (Rs.)

140 Kg., 8.0 Mtrs. long PCC poles


D.C.cross- arm of ISMC channel of 100 X 50, suitable for
4' centre DP with 2 pair of clamp sutiable for 140 kg. PCC
pole

No.

1460.00

Set

3234.00

11 KV Disc Insulator (Polymer)


11KV Strain hard ware fitting
11 KV Pin insulator (Polymer)
Horizontal and cross bracing 4' centre with set of four back
clamps
Stay set 16 mm. complete with back clamps, stay wire
7/3.15 mm. (5.5 kg.stay wire per stay set ) and turn buckles

No.
No.
No.

178.00
86.00
179.00

Set

2864.00

Set

875.03

Cmt. (1:3:6)

3100.00

Cmt. (1:3:6)

3100.00

No.

125.00

Ltr.
Ltr.
No.
No.
Kg.

95.00
159.00
232.00
75.00
69.00

2
3
4
5
7
8
9
10
11
12
13
14
15
16
17

18
19

Concreting of PCC pole @0.5 cmt per pole (Base pedding


+ Muffing)
Concreting of stay @ 0.2 cmt. per stay
Earthing Coil ( coil of 115 turns of 50 mm.dia. and 2.5 Mtrs.
lead of 4.0 mm. G.I wire)
Red oxide paint
Aluminium paint
Anti climbing devices
Danger Boards Enamalled Type 11KV
M.S.Nuts and Bolts
Total
Centages :
(i) Stores incidental charges
(ii) Contingencies
(iii W/c. establishment
(iv) T & P
Labour & Transportation charges @ 25.72% of material
cost for PCC Pole support
Cost per D.P.
Add 14% contractors profit
Add % for change of SSR

2.5 %
5.0 %
2.5 %
1.5 %

14%
5%

15

DATA FOR PROVIDING 1 NO. HT SERVICE LINE FOR A


CMD OF 100 KV LINE AND CONNECTED LOAD 108 HP + 5 KW ETC.

1 Supply, delivery of REC constructor standard No: A 5/ 1972 including 11 KV Line with 55 Sqm. AAA conduc
9.10 Mtrs long 140 Kgs working load at 60 Mts span and 75 Kg/Sqmm wind pressure with required stay set wh
the rates including cost of materials and conveyance to work site and labour charges for erection of HT line e
of VAT 12.50%).

Errection of 11 KV lines with 55 Sqmm AAA Conductor over


9.10 Mts PSCC poles at a span of 60 Mts etc.
Labour and Transport
Storage and handling charges
Add 12.50% VAT
Total Rs

2 Errection of line 11 KV AB Switch


Labour and Transport
Storage and handling charges
Add 14% contractors profit

14%

Add VAT Etc

0%

Add % for change of SSR

5%
Total Rs

15

rd No. A-34/1993 ( APSEB - Data-2013-14- Sheet No.15)

KV Line with 55 Sq.mm AAA Conductor over 9.1 Mts.

pan, 75 Kg/sq.Mt wind pressure, working load 140 Kgs.


Per Unit

Amount in Rs.

Each

55890

Each

9792

Each

5392

Each

2176

Each

9550

Set

6104

K.M.

86136

Each

5142

Each

3237

L.S

57876

L.S

4000
245295
5503
7359
72962
9018
24530
364667
51053
415720
0
415,720

15

OST SCHEDULE - C-6


D.P.STRUCTURE ON PCC POLES
MENTED TO EVERY 1.6 KMS.OF 11 K.V. LINE)
PCC pole
Qty.
2

Amt. (Rs.)
2920.00

3234.00

6
6
2

1068.00
516.00
358.00

2864.00

5250.18

3100.00

1.2

3720.00

125.00

0.6
0.6
2
1
6

57.00
95.40
464.00
75.00
414.00
24,260.58

11.5 %

2,790

6,240
27,050.55
3683.00
30734.00
1537.00
32271.00

15

OR PROVIDING 1 NO. HT SERVICE LINE FOR A


V LINE AND CONNECTED LOAD 108 HP + 5 KW ETC.

No: A 5/ 1972 including 11 KV Line with 55 Sqm. AAA conductor on PSCC poles of
span and 75 Kg/Sqmm wind pressure with required stay set wherever necessary etc,
eyance to work site and labour charges for erection of HT line etc. complete (inclusive

Rs

182300.00

Rs

26060.00

Rs

3085.00
211445.00
26430.625
237880.00

Rs

28700.00

Rs

1435.00

Rs

430.00
30570.00
4162.00
34732.00
0.00
34732.00
1737.00
36469.00

15

COST BASED ON ELECTRICAL SSR 2014-15


S.No

SSR item

Description

Basic cost

Supply, transportation and delivery at site of 3 Phase, 50 Hz, oil immersed and naturally cooled, outdoor / Indoor type
copper wound transformer designed and manufactured as per IS 2026-1977 and 1st filling of oil as per IS 335 of 1993,
connected delta on primary side and Star on secondary side with additional neutral brought out on load side, 1100V / (433V /
415V) with HV tapping + or - 2.5% contineously rated for full load and temporature rise not exceeding 50C in oil and 55C rise
by th resistance of the winding after contineous run on full load rating complete with the following standard mountings. Makes:
Kirloskar / Vijay Electricals / PETE / Esennar

(Note:Other than these makes / brands mentioned rate may be allowed as approved by AP Electricity Board).
1). Rated KVA :........KVA, 2). Service: Outdoor / Indoor, 3). Mounting : Plinth,
4). Copper wound: Double, 5).Type : Core, 6). Cooling : ONAN, 7). Temp Rise : 55:C.,
8). Vector Group: Dyn 11, 9). Primary Connection : Delta, 10). Primary Volts : 11000,
11). Primry Frequency : 50, 12)
.Primary Phases : 3, 13). Primary wires: 3,
14). Secondary connection : Star, 15) . Secondary Volts : 415 / 433V,
16) . Secondary phases : 3, 17) . Secondary wires: 4,
18) . Taps on primary winding for primary voltage variation : +7.5% to - 7.5% in steps of 2.5%,
19). Terminal arrangement. a). HV: Bare Busings / Cable end box b). LV : Cable box
20) . LV : One separate terminal for earthing.
21). No load losses (Watts): .......As per IS specification
22).Load losses (Watts):..As per IS specification,
23). Impedance(Z%) : .As per IS specification
24). Fittings & Accessories.
a. Rating and terminal marking plate b. Earthing terminals, c. Lifting Lugs
d. Conservator with drain plug. e. Oil level Indicator, f. Dehydrating silicagel breather
g. Air release device, h. Drain cum filter wall, i. Explosion vent with diaphragm j. Radiators (Attachable), k. Seperate neutral
bushing, l. Uni directional flat rollers.

ELEC-6.4.35
ELEC-6.4.36
ELEC-6.4.37
ELEC-6.4.38

... do. 63 KVA Copper Wound Transformer


... do. 100 KVA Copper Wound Transformer
... do. 160 KVA Copper Wound Transformer
... do. 250 KVA Copper Wound Transformer

165000.00
180000.00
295000.00
325000.00

S.No

SSR item
ELEC-6.4.39
ELEC-6.4.40

Description

Basic cost

... do. 315 KVA Copper Wound Transformer


... do. 500 KVA Copper Wound Transformer

375000.00
550000.00

Supply, transportation and delivery at site of 3 Phase, 50 Hz, Dry type, Indoor type copper wound transformer designed
and manufactured as per IS 2026-1977 and IS 11171-1985,connected delta on primary side and Star on secondary side
with additional neutral brought out on load side, 1100V / (433V / 415V) with HV tapping + or - 2.5% temporature rise by the
resistance 90:C. complete with the following standard mountings.Makes: Kirloskar / Vijay Electricals / PETE / Esennar

1). Rated KVA :........KVA, 2). Service: Indoor, 3). Mounting : Floor
4). Copper wound: Double, 5).Type of Cooling : ANAN, 6).Insulation class: Class F
7) : Temp Rise by resistance : 90:C., 8). Vector Group: Dyn 11,
9). Primary Connection : Delta, 10). Primary Volts : 11000, 11). Primry Frequency : 50,
Primary wires: 3,
14). Secondary connection : Star, 15) . Secondary Volts : 433V / 415V,
16) . Secondary phases : 3, 17) . Secondary wires: 4,
18) . Taps on primary winding for primary voltage variation : +5% to - 10% in steps of 2.5%,
19). Terminal arrangement. a). HV: Cable end box b). LV : Cable end box
20). No load losses (Watts): .......As per IS specification
21).Load losses (Watts):..As per IS specification,
22). Impedance(Z%) : .As per IS specification
23). Fittings & Accessories.
a. Rating and terminal marking plate b. Earthing terminals, c. Lifting Lugs
d. Winding Temperature Indicator, e. Seperate neutral bushing, l. Uni directional flat rollers.

12) .Primary Phases : 3, 13).

ELEC-6.4.41

... do. 100 KVA Copper Wound Transformer

400000.00

ELEC-6.4.42

... do. 250 KVA Copper Wound Transformer

645000.00

ELEC-6.4.43

... do. 315 KVA Copper Wound Transformer

735000.00

ELEC-6.4.44

... do. 500 KVA Copper Wound Transformer

910000.00

OH & CP

Sub-Total

Total Rs ./ Each

14%

22465
24507
40164
44249

187465.00
204507.00
335164.00
369249.00

187465.00
204507.00
335164.00
369249.00

Unit

OH & CP

Sub-Total

Total Rs ./ Each

Unit

14%
51056
74883

426056.00
624883.00

426056.00
624883.00

54460

454460.00

454460.00 Each

87817

732817.00

732817.00 Each

100070

835070.00

835070.00 Each

123897

1033897.00

1033897.00 Each

Page 2254 of 3205

Kandukur Municipality
DATA BASED ON - 2015 - 2016 SSR
I. Roads and Bridges -CHAPTER - 17

S.N

Description

Quantity

A HORTICULTURE
1

RBR-HRTC-1: Spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, f
earth to be paid for separately) as per Specification 307 MORTH
Unit = cum
Taking output = 15 cum
a) Labour
Mate
Mazdoor (Unskilled)
b&c) Overheads & Contractors Profit
Cost for 15 cum= a+b+c
Rate per cum = (a+b+c)/15

(i)

(ii)

15.00
- day
1.040 day
14%

RBR-HRTC-2 : Grassing with 'Doobs' grass including watering and maintenance of the lawn for 30 days or more t
free from weeds and fit for moving including supplying good earth if needed - as per Specification 307 MORTH
Unit = sqm
Taking output = 100 sqm
In rows 15 cm apart in either direction
a) Labour
Mate
Mazdoor (Unskilled) for grassing
Mazdoor (Unskilled) for maintenance for 30 days
b)
Machinery
Water tanker 6 KL capacity
c)
Material
Doob grass -M-112 -Irrigation SSR
Total
d&e) Overheads & Contractors Profit
Cost for 100 sqm = a+b+c+d+e
Rate per sqm= (a+b+c+d+e)/100
In rows 7.5 cm apart in either direction
a) Labour
Mate
Mazdoor (Unskilled) for grassing.
Mazdoor (Unskilled) for maintenance for 30 days
b)
Machinery
Water tanker6 KL capacity
c)
Material
Doob grass -M-112 -Irrigation SSR

100

0.170 day
0.920 day
1.000 day
0.500 hour
100.000 kg
14%

0.00 day
1.47 day
1.00 day
0.75 hour
200.00 kg

d&e) Overheads & Contractors Profit


14%
Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100
NOTE : In the case of horticulture one mate has been provided for every 10 mazdoors as maintenance of grass and p

337269598.xlsx - data-Parks

Page 2255 of 3205

RBR-HRTC-3 : Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and sup
planting at 15 cm apart, including supplying and spreading of farm yard manure at rate of 0.18 cum per 100 sqm- as p
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate
Mazdoor (Unskilled) for preparation of ground
Mali for fetching doobs grass roots and grassing at 15 cm apart
b)
Machinery
Water tanker 6 KL capacity
Tractor with tiller
c)
Material
Supply of farm yard manure at site of work (-rate as per Yanam PSR 201314, S.No.83, Code No.0160, Pg.64)
Fine grass -M-113 -Irrigation SSR
d&e) Overheads & Contractors Profit

100
0.00 day
0.65 day
1.00 day

0.50 hour
0.01 hour
0.18 cum
100.00 kg
14%

Cost for 100 sqm = a+b+c+d+e


Rate per sqm = (a+b+c+d+e)/100
4

RBR-HRTC-4 : Maintenance of lawns or Turfing of slopes (rough grassing) for a period of one year including wa
307 MORTH
Unit = sqm
Taking output = 100 sqm
100
a) Labour
Mali
10.00 day
b)
Machinery
Water tanker 6 KL capacity
15.00 hour
c)
Material
Cost of water - M-189 -Irrigation SSR
90.00 KL
d&e) Overheads & Contractors Profit
Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100

14%

RBR-HRTC-5 ; Turfing lawns with fine grassing including ploughing, dressing including breaking of clods, rem
supplying doobs grass roots at 10 cm apart, including supplying and spreading of farm yard manure at rate of 0.
Specification 307 MORTH
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate
Mazdoor (Unskilled) for preparation of ground
Mali for fetching doobs grass roots hedges and grassing at 10 cm apart
b)
Machinery
Water tanker6 KL capacity
Tractor with tiller
c)
Material
Supply of farm yard manure at site of work @ 0.6 cum per 100sqm
Fine grass

100
0.00 day
1.25 day
1.50 day

0.50 hour
0.01 hour
0.60 cum
100.00 kg

d&e) Overheads & Contractors Profit


Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100

337269598.xlsx - data-Parks

14%

Page 2256 of 3205

RBR-HRTC-6 : Maintenance of lawns with fine grassing for the first year including watering etc -as per Specification 3
Unit = sqm
Taking output = 100 sqm
a) Labour
Mali
b)
Machinery
Water tanker6 KL capacity
c)
Material
Cost of water

100
10.00 day
20.00 hour
60.00 KL

d&e) Overheads & Contractors Profit


Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100
Total Rate per sqm = (a+b+c+d+e)/100
7

(a)

RBR-HRTC-7 : Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the ex
yard manure, supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm ap
MORTH
Planting permanent hedges including digging of trenches
Unit = Running metre
Taking output = 100metre
a) Labour
Mate
Mazdoor (Unskilled) for digging of trench 60 cm wide and 45 cm deep
Mazdoor (Unskilled) for refilling the excavated earth mixed with cow dung,
preparation of ground and digging of plant, from the nursery carriage to site
and planting in position
b)
Machinery
Water tanker 6 KL capacity
c)
Material
Cost of hedge plants 2 rows at 30 cm apart 2x340 (-rate as per Yanam PSR
2013-14, S.No.87, Code No.0161, Pg.64)

(b)

14%

100
0.00 day
10.00 day
5.40 day

0.50 hour
680.00 each

Supply of farm yard manure at site of work


Pesticide ( market rate)
Cost of water

4.67 cum
0.25 kg
3.00 KL

d&e) Overheads & Contractors Profit


Cost for 100 metres = a+b+c+d+e
Rate per metre = a+b+c+d+e)/100
Maintenance of hedge for one year
Unit = Running metre
Taking output = 100 m
a) Labour
Mate
Mazdoor (Unskilled)
b)
Machinery
Water tanker6 KL capacity
c)
Material
Manure sludge/Farm yard manure
Pesticide
Cost of water
Cost of hedge plants @ 10 per cent casualty

14%

d&e) Overheads & Contractors Profit


Cost for 100 metres = a+b+c+d+e
Rate per metre = a+b+c+d+e)/100
Total Cost for Planting and Maintaining for 1 year
337269598.xlsx - data-Parks

100
day
33.00 day
5.00 hour
2.00
0.50
30.00
68
14%

cum
kg
KL
each

8
(a)

Page 2257 of 3205

RBR-HRTC-8 : Planting flowering plants and shrubs in central verge as per Specification 307 MORTH
Planting flowering plants
Unit = Running metres 200 plants and 800 shrubs in two rows in one km
length of road where width of verge is 3m and above.
Taking output = 1000 metres
a) Labour
Mate
Mazdoor (Unskilled)
b)
Machinery
Water tanker6 KL capacity
c)
Material
Plants - M-100 - Irrigation SSR
Shrubs - M-166 - Irrigation SSR
Manure sludge/Farm yard manure
Pesticide
Cost of water

(b)

1000
day
13.20 day
6.00 hour
200.00
800.00
63.64
0.50
36.00

d&e) Overheads & Contractors Profit


Rate per Km = (a+b+c+d+e)
Rate per 1 Rmt
Maintenance of flowering plants and shrubs in central verge for one
year
Unit = km
Taking output = one km
a) Labour
Mate
Mazdoor (Unskilled)
b)
Machinery
Water tanker6 KL capacity
c)
Material
Manure Sludge / farm yard manure at site
Cost of water
Replacement of casualties @ 10 per cent
Plants
Shrubs - M-166 - Irrigation SSR
Pesticides

each
each
cum
kg
KL

14%

day
401.00 day
90.00 hour
10.00 cum
180.00 KL
20.00 each
80.00 each
1.50 kg

d&e) Overheads & Contractors Profit


Rate per Km for one year = (a+b+c+d+e)
Rate per 1 Rmt

14%

Total Cost for Planting and Maintaining for 1 year

RBR-HRTC-9: Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mix
yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining th
Specification 307 MORTH
Unit = Each
Taking output = 10 trees
a) Labour
Mate
Mazdoor (Unskilled) for planting
Mazdoor (Unskilled) for maintenance for one year
b)
Machinery
Water tanker6 KL capacity
c)
Material
Sapling 2 m high 25 mm dia
Farm yard manure
Pesticide
Cost of water
d&e) Overheads & Contractors Profit

10
-

day
3.70 day
15.00 day
2.00 hour
10.00
0.94
0.50
12.00
14%

337269598.xlsx - data-Parks

each
cum
kg
KL

Cost for 10 trees = a+b+c+d+e


Rate per trees = (a+b+c+d+e)/10

Page 2258 of 3205

337269598.xlsx - data-Parks

Page 2259 of 3205

10

RBR-TSRA-17 : Fencing With Welded Steel Wire Fabric 75 mmx50 mm : Providing 1.20 metre high fencing with
mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end and
provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm mesh and fixed to iron posts by
etc. complete in all respects. (MORTH Suggestive )
Unit = Running metre
Taking output = 30 m
a) Labour
Mate
Welder
Mazdoor
b)
Material
i) Angle iron for posts 50 x 50 x 6 mm
ii) Runner flat 50 x 5 mm
iii) Welded steel wire fabric 75x50 mm mesh @ 4 kg/sqm, 4 x 30 x 1.2 + 5
per cent wastage M-191 - Irrigation SSR
c)
Machinery
Tractor-trolley
d)
Painting
Painting two coats including priming
d&e) Overheads & Contractors Profit
Cost for 30 metre = a+b+c+d+e+f
Rate per metre = (a+b+c+d+e+f)/30

11

30
0.00
1.00
2.12

day
day
day

106.00
26.00
151.00

kg
kg
kg

0.10

hour

8.00

sqm

14%

RBR-TSRA-17 : Fencing With Welded Steel Wire Fabric 75 mmx25 mm : Providing 1.20 metre high fencing with
mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete, corner, end and
provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm mesh and fixed to iron posts by
etc. complete in all respects. (MORTH Suggestive )
Unit = Running metre
Taking output = 30 m
a) Labour
Mate
Welder
Mazdoor
b)
Material
i) Angle iron for posts 50 x 50 x 6 mm
ii) Runner flat 50 x 5 mm
Welded steel wire fabric 75 x 25 mm mesh @ 7.75 kg/sqm, 7.75 x 30 x 1.2 +
5 per cent wastage
c)
Machinery
Tractor-trolley
d)
Painting
Painting two coats including priming
d&e) Overheads & Contractors Profit
Cost for 30 metre = a+b+c+d+e+f
Rate per metre = (a+b+c+d+e+f)/30

30
0.00
1.00
2.12

day
day
day

106.00
26.00
293.00

kg
kg
kg

0.10

hour

8.00

sqm

14%

Note : i) Adopt any one type of welded steel wire fabric 75 x 50 mm or 75 x 25 mm as per approved design.
Note : ii) The item of excavation and cement concrete in foundation shall be measured and paid separately

337269598.xlsx - data-Parks

Page 2260 of 3205

CIVIL WORK

12

BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead o
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work in
dewatering charges etc as per SS - 20 B (APSS 308).
out put

Ordinary Soil-Manual Means-Upto 3 m depth


a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour -Irrigation-Unskilled-S.No.3)
Add Municipal Allowence on Labour component @
Sub total
extra for foundations @

10.00

0 day
3.64 day.
20%
75%
Sub - Total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering
13

14%

0%
0%

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal m
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyanc
sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and und
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1


Coarse aggregate 40mm (C-Mat-S.No:57)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:

Mason 1st class (Labour-Irrigation- skilled-S.No:11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit

14%
Sub - Total

Add VAT @
Add Labour Cess @

0%
0%
Rate per One Cum

14

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (Ce
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of a
coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concr
finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 20mm graded (C-Mat-S.No:47)
Fine aggregate- Sand (C-Mat-S.No:3)
Water (including for curing) (Irrigation SSR-S.No:M189)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:
Mason 1st class (Labour-Irrigation- skilled-S.No:11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
337269598.xlsx - data-Parks

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour
0.10 day
1.39 day

Page 2261 of 3205

Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

15

BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone inclu
materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour c
required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finish
A. MATERIALS:
Cement
Coursed Rubble Stone ( C-Mat- Sn.10)
Rough Stone ( C-Mat- Sn.8)
Bond Stones 7Nos 0.24x0.24x0.39 =0.16cum( C-Mat- Sn.12)
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

16

1.20 day
2.00 day
14%
0%
0%

BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard g
Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materia
Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

17

79.20 Kg
0.44 Cum
0.50 Cum
0.16 Cum
0.33 Cum

76.80 Kg
0.94 Cum
0.16 Cum
0.32 Cum
1.50 day
2.32 day
14%
0%
0%

BLD-CSTN-7-3-(74) : Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for includ
materials to site , seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for fin
A. MATERIALS:
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 2nd class ( Labour-Irrigation-Semi skilled-Sn.35)
Mazdoor (unskilled)
337269598.xlsx - data-Parks

28.80 Kg
0.06 Cum
0.50 day
0.74 day

Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

Page 2262 of 3205

14%
0%
0%

337269598.xlsx - data-Parks

18

Page 2263 of 3205

BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conv
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

19

0.15 Cum
0.60 day
0.96 day
14%
0%
0%

BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after thoro
remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incid
charges etc., complete for finished item of work, but excluding conveyance charges of materials

Gum, conjee water, or prickly pear juice including necessary fire wood

1.20 Kg
LS

Brick Layers / Painter ( Labour-Irrigation-Skilled-Sn.11)


Mazdoor (unskilled)

0.11 day
0.22 day

Whiting / White Cement - BMS-W.68

Sundries including brushes, ladders, etc.,


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Total cost
Rate per 10 Sqm
20

14%
0%
0%

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations
in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APS
out put

Earth filling (ordinary soil)

Re filling

0.50%

b) Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6
Rate per 1 Cum

337269598.xlsx - data-Parks

6.00

0.00 day
0.31 day
14%
0%
0%

21

Page 2264 of 3205

RBR-CCPV-13 - ii: Providing and Laying of Interlocking Concrete Block Pavements using PHOENIX or equi
Concrete interlocking Regular Pavers of 60 mm thickness of M- 40 Grade of which top 12 mm thick shall be for colo
colours and white cement to get required reflective glazing inclusive of all taxes - as per drawing and Technical Specif
Unit = sqm
Taking output = 225 sqm
a)Labour
Mate
Mazdoor (Unskilled)
Mason (2nd class)
b) Machinery
Water tanker 6 kl capacity
c) Material
Supply of PHOENIX or equivalent - BMT-D.11, Sl.No.101 of Pg.No.16
(ii) Edge blocks 60 m x 2
(iii) Sand as per Table 1500.5 ( C-Mat-Sn.1)
Bed = 603x75x 0.03 = 6.75 cum
Joints = 60x0.08
= 0.48 cum
(iv) Water for wetting of bedding sand

13.62%
0%
0%

2. Edge blocks may be cast-in-situ. Brick masonry toe wall or CC block 300 mm x 300 mm x 150 mm or any othe
their cost shall be analysed/included accordingly
1 Cum
0.045 Cum
13.62%
0%
0%

Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angle
c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre inclu
holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and pain
oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting,
operational charges and all labour charges etc., complete for finished item of work.
For MS Gate
Quantity Anailysis
45 x 45 x 6mm MS equal angle alround @ 4.00 Kg/Rmt
Vertical Angle (1.50+2.0)
Horizontal Angle
Z Holdfasts

225.00 sqm

3.00 kl

Cost of CC 1:2:4 without CP


size of Edge Block 500 mm x 300 mm x 150 mm
Qty of each block of1.00 m length
Overheads & Contractors Profit
total
Add VAT @
Add Labour Cess @
Rate for 1 Rmt
22

2.00 hour

120.00 m
5.42 cum

d&e) Overheads & Contractors Profit


total
Add VAT @
Add Labour Cess @
Cost for 225 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/225

- day
15.90 day
7.00 day

1.75 x

2 Nos
2 Nos
4 Nos

1.75
1.50
0.45

9.00 Rmt
2 Nos
1.50
3.00 Rmt

35x35x5mm MS equal Horizontal Angle@2.60Kg/Rmt


Total Angles Qty

12mm M.S square bars @ 1.13 kg /Rmt


Vertical bars

337269598.xlsx - data-Parks

12 Nos

1.75

Page 2265 of 3205

Total Square Bars Qty


MS Sheet of 2.00mm (14G) for Bottom portion @ 15.70 Kg/ 1 Sqm

21.00 Rmt
1.50 0.30
0.45 Sqm

337269598.xlsx - data-Parks

Page 2266 of 3205

Cost Analysis
Cost of Equal angles
Cost of 12mm MS squre bars
Cost of MS sheet
Labour charges for fabricating steel and fixing in position as per SSR Item
No.BMM-V.14-880
Add Municipal Allowence on Labour component @
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position- BMM-V.15-881.Pg- 68
Add Municipal Allowence on Labour component @
Painting with Synthetic enamil paint
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long -BMT-G18 - S.No.179
MS-Powder Coated Aldrop (IS:2681) 300 mm long -BMT-G.45
Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @

43.80 Kgs
23.73 Kgs
7.07 Kgs
74.60 Kgs
20%
74.60 Kgs
20%
2.63 Sqm
2 No
1 No
13.62%
0%
0%

Rate per2.625 Sqm


Rate per 1 Sqm
Rate per 74.595 Kg
Rate per 1 Kg
23

BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layer
consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site
labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Sand Filling

6.00

Sand Filling in Foundations

a) Material
Sand (C-Mat-S.No1)

6.00 Cum

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.00 day
0.31 day

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

14%
0%
0%

Rate per 1 Cum

24

BLD-CSTN-12-12-(193): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work &
and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., com
(APSS No. 1201, 1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.
( Irrigation SSR-Sn.71)
1st Class Painter ( Labour - Irrigation-Skilled-Sn.35)
2nd Class Painter ( Labour - Irrigation-Semi Skilled-Sn.37)
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
337269598.xlsx - data-Parks

0.70 Ltr
0.21 day.
0.49 day.

14%
0%
0%

Rate per 10 Sqm

Page 2267 of 3205

337269598.xlsx - data-Parks

Page 2268 of 3205

SR
17
Rate

Unit

Amount in Rs.

thickness (cost of sludge, farm yard manure or/and good

Cum

384.00

1 day

399.36
54.37
453.73
30.20

e lawn for 30 days or more till the grass forms a thick lawn
cification 307 MORTH

Sqm

450.00
384.00
384.00

1 day
1 day
1 day

76.5
353.28
384.00

865.50

1 hour

432.75

6.00

1 kg

600.00
1846.53
251.41
2097.94
21.00

450.00
384.00
384.00

1 day
1 day
1 day

0
564.48
384.00

865.50

1 hour

649.13

6.00

1 kg

1200.00
2797.61
380.89
3178.5
31.80
maintenance of grass and plants require more care.

337269598.xlsx - data-Parks

Page 2269 of 3205

of rubbish, dressing and supplying doobs grass roots and


0.18 cum per 100 sqm- as per Specification 307 MORTH

Sqm
450.00
384.00
450.00

1 day
1 day
1 day

0
249.6
450.00

865.50
415.00

1 hour
1 hour

432.75
4.15

161.00

1 cum

28.98

8.00

1 kg

800.00
1965.48
267.6
2233.08
22.30

riod of one year including watering etc -as per Specification

Sqm
450.00

1 day

4500.00

865.50

1 hour

12982.50

103.00

1 KL

9270.00
26752.50
3642.35
30394.85
303.90

ding breaking of clods, removal of rubbish, dressing and


m yard manure at rate of 0.6 cum per 100 sqm - as per

Sqm
450.00
384.00
450.00

1 day
1 day
1 day

0.00
480.00
675.00

865.50
415.00

1 hour
1 hour

432.75
4.15

161.00

1 cum

96.60

8.00

1 kg

800.00
2488.50
338.81
2827.31
28.30

337269598.xlsx - data-Parks

Page 2270 of 3205

ng etc -as per Specification 307 MORTH

Sqm
450.00

1 day

4500.00

865.50

1 hour

17310.00

103.00

1 KL

6180.00
27990.00
3810.84
31800.84
318.00
346.30

d 45 cm deep, refilling the excavated earth mixed with farm


ng hedge plants at 30 cm apart - as per Specification 307

Rmt
450.00
384.00

1 day
1 day

0.00
3840.00

384.00

1 day

2073.60

865.50

1 hour

432.75

8.00

1 each

5440.00

161.00
250.00
103.00

1 cum
1 kg
1 KL

751.87
62.50
309.00
12909.72
1757.66
14667.38
146.70

384.00

1 day

12672.00

865.50

1 hour

4327.50

161.00
250.00
103.00
8.00

1 cum
1 kg
1 KL
1 each

322.00
125.00
3090.00
544.00
21080.50
2870.11
23950.61
239.50
386.20

Rmt

337269598.xlsx - data-Parks

Page 2271 of 3205

307 MORTH

Rmt

384.00

1 day

5068.80

865.50

1 hour

5193.00

40.00
15.00
161.00
250.00
103.00

1 each
1 each
1 cum
1 kg
1 KL

8000.00
12000.00
10246.04
125.00
3708.00
44340.84
6037.01
50377.85
50.38

384.00

1 day

153984.00

865.50

1 hour

77895.00

161.00
103.00
10%
40.00
15.00
250.00

1 cum
1 KL

1610.00
18540.00
25202.90
800.00
1200.00
375.00
279606.90
38068.48
317675.40
317.68

1 each
1 each
1 kg

368.06

deep dug in the ground, mixing the soil with decayed farm
ee guard and maintaining the plants for one year- as per

Nos

384.00
384.00

1 day
1 day

1420.80
5760.00

865.50

1 hour

1731.00

20.00
161.00
250.00
103.00

1 each
1 cum
1 kg
1 KL

200.00
151.34
125.00
1236.00
10624.14
1446.48
337269598.xlsx - data-Parks

12070.65
1207.10

Page 2272 of 3205

337269598.xlsx - data-Parks

Page 2273 of 3205

1.20 metre high fencing with angle iron posts 50 mm x 50


concrete, corner, end and every 10th post to be strutted,
sh and fixed to iron posts by flat iron 50 x 5 mm and bolts

m
450.00
504.00
384.00

1 day
1 day
1 day

0.00
504.00
814.08

38.00
38.00
155.00

1 kg
1 kg
1 kg

415.00

1 hour

41.50

523.46

10 sqm

418.77
30199.35
4111.64
34310.99
1143.70

4028.00
988.00
23405.00

1.20 metre high fencing with angle iron posts 50 mm x 50


concrete, corner, end and every 10th post to be strutted,
sh and fixed to iron posts by flat iron 50 x 5 mm and bolts

m
450.00
504.00
384.00

1 day
1 day
1 day

0.00
504.00
814.08

38.00
38.00
155.00

1 kg
1 kg
1 kg

415.00

1 hour

41.50

523.46

10 sqm

418.77
52209.35
7108.30
59317.65
1977.30

4028.00
988.00
45415.00

er approved design.
nd paid separately

337269598.xlsx - data-Parks

Page 2274 of 3205

lifts and with an initial lead of 10m including all operational,


for finished item of work including seigniorage excluding
Cum
450.00
320.00

1 day
1 day.

Rs

0.00
1164.80
232.96
1397.76
873.60
2271.36
309.25
2580.61
258.06
0.00
0.00
258.06

Cement concrete nominal mix (1:4:8) prop (Cement : fine


ncluding cost and conveyance of all materials like cement,
charges , for mixing , laying, concrete , ramming in 15 cm
work.for foundation and under flooring bed.

5.74
1489.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

929.88
1340.83
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
3673.44
500.14
4173.58
0.00
0.00
4173.58

Rs

Rs

crete nominal mix m-20 (Cement : fine aggregate: coarse


cost and conveyance of all materials like cement, sand,
es , for mixing , laying, concrete , ramming in 15 cm layers,
ith nomonal reinforcement

5.74
1854.81
858.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1669.33
386.52
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
337269598.xlsx - data-Parks

Rs

Rs

4996.41
680.26
5676.67
0.00
0.00
5676.67
5676.67

Page 2275 of 3205

sing hard granite stone including cost & Conveyance of all


s on all Materials, ,labour charges for cutting Stones to
uring etc., complete for finished item of Work .

5.74
1112.81
896.81
1684.81
858.93

1 Kg
1 Cum
1 Cum
1 Cum
1 Cum

454.61
489.64
448.41
269.57
283.45

504.00
384.00

1 day
1 day

604.80
768.00
3318.48
451.81
3770.29
0.00
0.00
3770.29

Rs

Rs

( 1:6 ) Prop using hard granite stone including cost &


orage Charges on all Materials, ,labour charges for cutting
Charges curing etc., complete for finished item of Work .

5.74
1112.81
1684.81
858.93

1 Kg
1 Cum
1 Cum
1 Cum

440.83
1046.04
269.57
274.86

504.00
384.00

1 day
1 day

756.00
890.88
3678.18
500.78
4178.96
0.00
0.00
4178.96

Rs

Rs

Mortor (1:3) Prop . for including cost & conveyance of all


curing etc., Complete for finished item of work

5.74
858.93

1 Kg
1 Cum

165.31
51.54

450.00
384.00

1 day
1 day

225.00
284.16
337269598.xlsx - data-Parks

Rs

Rs

726.01
98.85
824.86
0.00
0.00
824.86

Page 2276 of 3205

337269598.xlsx - data-Parks

ooth including cost and conveyance of all materials to site,


incidental, labour charges etc., including cutting grooves
qm.

3045.08

1 Cum

456.76

504.00
384.00

1 day
1 day

302.40
368.64
1127.80
153.55
1281.35
0.00
0.00
1281.35

Rs

Page 2277 of 3205

ve an even shade after thoroughly brushing the surface to


ls, labour charges and incidental such as scaffolding, lift
aterials
29.00

1 Kg

34.80
10.00

504.00
384.00

1 day
1 day

55.44
84.48
184.72
0.92
185.64
25.27
210.91
0.00
0.00
210.91
210.91

Rs

nches, sides of foundations and basement with initial lead


ramming including cost and conveyance of water to work
or finished item of work. (APSS NO. 309 & 310)
Cum
0.00
384.00

1 day
1 day

0.00
119.04
16.21
135.25
0.00
0.00
135.25
22.54
22.54

337269598.xlsx - data-Parks

using PHOENIX or equivalent high strength Cement


2 mm thick shall be for colour pigmentation with imported
rawing and Technical Specification Clause 1504 MORD

384.00
450.00

1 day
1 day

6105.60
3150.00

865.50

1 hour

1731.00

335.00

1 sqm

75375.00

255.45
641.93

1m
1 cum

30654.00
3479.26

103.00

1 kl

Rs

Page 2278 of 3205

309.00
120803.86
16447.45
137251.31
0.00
0.00
137251.31
610.01

mm x 150 mm or any other shape can also be used and


4996.41
4996.41

1 Cum

224.84
30.61
255.45
0.00
0.00
255.45

os 35x35x5mm Equal angles horizontal supports at 0.50m


25mm centre to centre including fixing with 4 Nos of MS Z
inal surface neatly and painting gate with one coat of red
amental pieces etc ,cutting, bending, welding including all

1.50

4.00
3.00
2.00
9.00 Rmt
4.00 Kg/Rmt
3.00
2.60 Kg/Rmt

2.625 Sqm

36.00 Kgs
7.80 Kgs
43.80 Kgs

21.00 Rmt
21.00 Rmt
337269598.xlsx - data-Parks

1.13 Kg/Rmt
0.450 Sqm

23.73 Kgs

15.70 Kg/Sqm

7.07 Kgs
74.60 Kgs

Page 2279 of 3205

337269598.xlsx - data-Parks

Page 2280 of 3205

38.00
34.00
37.00
22.00

1 Kg
1 Kg
1 Kg
1 Kg

1664.40
806.82
261.41
1641.09

4.00

1 Kg

328.22
298.38

523.46
90.00

10 Sqm
1 No

59.68
137.41
180.00

176.00

1 No

176.00

Rs.

5553.41
756.10
6309.51
0.00
0.00
6309.51
2404.00
6309.51
85.00

ent with initial lead in layers not exceeding 15 cm thick,


yance of water to work site and all operational, incidental,
. 309 & 310)
Cum
641.93

1 Cum

3851.58

0.00
384.00

1 day
1 day

0.00
119.04
3970.62
540.6
4511.22
0.00
0.00
4511.22
751.87
751.87

od Work, Old Wood Work & New Iron Work including cost
all labour charges etc., complete for finished item of work.
260.00

1 Ltr

182.00

576.00
450.00

1 day.
1 day.

120.96
220.50
0.00
523.46
71.27
594.73
0.00
0.00

Rs

337269598.xlsx - data-Parks

Rs

594.73

Page 2281 of 3205

337269598.xlsx - data-Parks

Page 2282 of 3205


DATA FOR C. C. ROAD WORKS
Kandukur Municipality
DATA BASED ON - 2014 - 2015 SSR
1

20/02/16
RBR-EECD-5 (ii): Excavation for roadway in soil by mechanical means including cutting and pushing the earth
distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grad
Technical Specification Clause 302.3 MORD / 301 MORTH.( Using Dozer)
Unit = cum
Taking output
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Dozer D-50 @ 50 cum per hour (cutting with pushing)
Sub-Total
c) Overheads & Contractors Profit
Cost of 180 cum = a+b+c
Rate per cum = (a+b+c)/180
#REF!
Rate per 1 Cum

2.080 Nos
3.600 hour

14.00%

#REF!

RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing th
upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, g
complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the E
Excavator)
Unit = 1 cum
Taking output
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour
( Hire R & B )
c) Seigniorage Charges
Sub-Total
d) Overheads & Contractors Profit
Cost for 180 cum = a+b+c+d
Rate per cum a+b+c+d / 180
#REF!
Rate per 1 Cum

180 Cum

180 Cum
2.08 Nos
3.00 hour
180.00 Cum
14.00%

#REF!

RBR-EECD-8(ii) : Excavation for roadway in ordinary rock by deploying a dozer D-50 including cutting and pu
embankment upto a distance of 100 m (average lead 50 m), trimming bottom and side slopes in accordance with the
and cross-sections with lift upto 3 m as per Technical Specification Clause 301 MORTH / 302 MORD.
Unit = cum
Taking output
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Dozer D-50 @ 50 cum per hour (cutting with pushing)
Sub-Total
c&d) Overheads & Contractors Profit
Cost for 108 cum = a+b+c+d
337269598.xlsx data-CC road

108 Cum
- Nos
3.120 Nos
2.160 hour

14.00%

Page 2283 of 3205


Rate per cum = (a+b+c+d)/108
#REF!
Rate per 1 Cum

#REF!

337269598.xlsx data-CC road

Page 2284 of 3205


Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
4

RBR-EECD-5-iii : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including
trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and tra
location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH
Unit = cum
Taking output
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/ hour
Tipper 5.5 cum capacity, 4 trips per hour
Total
c&d) Overheads & Contractors Profit
Cost for 360 cum = a+b+c+d
Rate per cum = (a+b+c+d)/360
#REF!

360
- Nos
2.08 Nos
3.60 hour
15.00 hour
14.00%

#REF!

Rate per 1 Cum


5

Construction of Embankment with Material Obtained from Roadway Cutting

RBR-EECD-3 : Construction of embankment with approved materials deposited at site from roadway cutting an
exceeding 0.6 m depth) and foundation of other structures graded and compacted to meet requirement of Ta
Technical Specification Clause 301.5 MORD / 305 MORTH
Unit = cum
Taking output
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Dozer D-50 for spreading @ 200 cum per hour
Motor grader for grading @ 200 cum per hour
Water tanker 6 kl capacity
Three wheel 80-100 kN Static Roller (or)
Vibratory Roller 80 - 100 kN @ 100 cum per hour (hire-63)
c) Material
Water
Total
d) Overheads & Contractors Profit
Cost for 100 cum = a+b+c+d+e (Vibratory Roller)
Rate per Cum = (a+b+c+d)/100
#REF!

100 Cum
day
0.520 day
0.500 hour
0.500 hour
2.000 hour
1.250 hour
1.000 hour
12.000 kl
14.00%

#REF!

Rate per 1 Cum


Note : In case the earth cutting is done by dozer and pushed for filling in the embankment, the input of dozer in the
deleted as the same is already provided in the cost of excavation. However, if the earth is dumped by tippers from
dozer for spreading is required to be provided.

337269598.xlsx data-CC road

Page 2285 of 3205


5

RBR-SBBS-12: Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method n
sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing
rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per C
Specification Clause 408 MORD.
Using naturally occurring gravel / (excavated material)
Unit = cum
Taking output = 300 cum
a)Labour
Mate
Mazdoor (Skilled)
Mazdoor (Unskilled)
b) Machinery
Motor grader 110 HP 50 cum per hour (Hire-2008-09-32)
Three wheel 80-100 kN static roller @10 cum per hour
Tractor with rotavator 25 cum per hour (Hire 2008-09-54)
Water tanker 6 kl capacity(Hire-65)
c) Material
Naturally occurring gravel (Local materials as per Table 400.13)
Water

- day
2.48 day
10.00 day
6.00 hour
30.00 hour
12.00 hour
5.00 hour
384.00 cum
30.00 kl

d&e) Overheads & Contractors Profit


Cost for 300 cum = a+b+c+d+e
Rate per cum = a+b+c+d+e/300
#REF!

14.00%

#REF!

Rate per 1 Cum


6

Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cost &
charges, all leads & lifts and other incidental and operational charges etc., complete.

Rock/CC
Page No.376 of SSR, Conveyance rates - 5.00 Km
#REF!
Add Sundries
Rate per 1 Cum
Earth
Page No.376 of SSR, Conveyance rates - 5.00 Km
#REF!
Add Sundries
Rate per 1 Cum

1 Cum
#REF!

1 Cum
#REF!

Providing road crossing pipes with R.C.C. NP 2 class socket and spigot pipes conforming to B.I.S. 458/200
length) including earth work excavation, Lowering the RCC pipes carefully into the trenches, laying them true t
jointing with rubber rings and refilling the trenches with excavated soils etc., including cost and conveyance of all m
and all taxes like ,CED, ST etc., but excluding VAT,
Dia of the Pipe
Output
cost of RCC Pipe as per data sheet
Lowering and jointing charges
Earth work excavation including refilling for trench size of 10.00 x
0.50 x 0.60m = 3.00 cum ( Rate as per Drains without over heads)
Sub Total
337269598.xlsx data-CC road

150 mm
10.00 Rmt
10.00 Rmt
10.00 Rmt
3.00 Cum

Page 2286 of 3205


Overheads & Contractors Profit
Cost for 10.00 Rmt
Rate per 1 Rmt
Rate per 1 Rmt

14.00%

337269598.xlsx data-CC road

Page 2287 of 3205


8

Providing road crossing pipes with R.C.C. NP 2 class plain ended pipes conforming to B.I.S. 458/2003 (rate
including earth work excavation, Lowering the RCC pipes carefully into the trenches, laying them true to the alignm
rubber rings and refilling the trenches with excavated soils etc., including cost and conveyance of all material and a
like ,CED, ST etc., but excluding VAT,
Dia of the Pipe
Output
cost of RCC Pipe as per data sheet
Lowering and jointing charges @ Rs.18/every 25mm dia/ 1m
(Sn.11.a of PH SSR)
Earth work excavation including refilling for trench size of 10.00 x
0.50 x 0.60m = 3.00 cum ( Rate as per Drains without over heads)
Sub Total
Overheads & Contractors Profit
Cost for 10.00 Rmt
Rate per 1 Rmt
Rate per 1 Rmt

150 mm
10.00 Rmt
10.00 Rmt
10.00 Rmt

3.00 Cum

14.00%

BLD-CSTN-3-5-Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size H
Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seignio
labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level cu
item of work.for foundation and under flooring bed.
Unit : 1cum

A. MATERIALS:
Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
Overheads & Contractors Profit

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour
0.10 Nos
1.39 Nos
14.00%
Rate per cu.m.

#REF!

#REF!

Rate per 1 Cum

337269598.xlsx data-CC road

Page 2288 of 3205


9

BLD-CSTN-3-7-Using Concrete mixture all works up to Plinth Level


Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to si
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the requ
for finished item of work.for foundation and under flooring bed.
Unit : 1cum

A. MATERIALS:
Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Grand Total
Overheads & Contractors Profit

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour
0.10 Nos
1.39 Nos
14.00%
Rate per cu.m.

#REF!

#REF!

Rate per 1 Cum


13

BLD-CSTN -3-14-Using Concrete mixture up to Plinth Level


Laying VCC in M30 grade Design Mix for CC road slab using OPC cement @ 350 Kg/Cum of Concrete; coarse an
IS:383 as per approved mix design, with coarse aggregates of 20mm graded Hard Granite Machine Crush
conveyance of all materials like Cement, Sand, Coarse Aggregate, Water, machinery, vibrating charges, centrin
Seigniorage Charges, curing (including provision and placing in position of expansion, contraction, construction
filling but excluding cost of joint filler and sealant), including all incidental and operational charges etc. comp
confirming to Standard specification SS 1515 & IRC & Morth.
Note : 1) The quantities for cement,course ag
for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the ce
less than 350 Kgs/ Cum the defference in cost shall be deducted

Unit : 1cum
A. MATERIALS:
Cement
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Weigh Batcher Hire charges (Machine mixing) charges
Vibrator hire charges,R&B rate(Plate compactor)
C. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Centering Charges for Pavement (SSR 306/L.8/2008-09 )
Total
Overheads & Contractors Profit

350.00 Kg
0.80 Cum
0.40 Cum
1.20 Kl
1.333 Hr
1.333 Hr
0.133 Nos
0.267 Nos
4.600 Nos
1.00 Cum
14.00%

Grand Total
#REF!

#REF!

Rate per 1 Cum

337269598.xlsx data-CC road

Page 2289 of 3205


14

RBR-FNDN-4 - G: Providing concrete for plain/reinforced concrete in open foundations using 20 mm nominal size
mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete a
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
V.C.C. grade M 30 Design Mix, using 20 mm Graded Metal
(MORTH 12.8 G)
Case 1 : Using Concrete Mixer
Unit = cum
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
(b) Labour
Mate
Mason (1st Class)
Mazdoor (Unskilled)
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
(d) Formwork @ 3.5% on (a+b+c)
e&f) Overheads & Contractors Profit
Rate per cum = a+b+c+d+e+f
#REF!
Rate per 1 Cum

337269598.xlsx data-CC road

0.407 t
0.45 cum
0.54 cum
0.36 cum
- day
0.1 day
1.39 day
0.40 hour
0.40 hour
3.50%
14.00%
#REF!

Page 2290 of 3205


15

RBR-CCPV-5: Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over
grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS
mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in appro
channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork
concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous o
contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to br
joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water
per drawing and Technical Specification Clause 1501 MORD.

Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a)Labour
Mate
Mason (1st class)
Mason (2nd class)
Mazdoor (Unskilled)
Mazdoor (Skilled)
Surveyor
Mazdoor (Semi-Skilled)
Blacksmith for cutting of dowel bars including removal of burrs,
fabrications & fixing of dowel bars.
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh batcher
and suitable capacity calibrated water tank
Needle vibrator
Screed vibrator
Plate vibrator
Concrete joint cutting machine for initial & final cuts
Water tanker 6 kl capacity
Air Compressor (1 hour initial + 1 hour final)
c) Material
Crushed stone coarse aggregates, grading will be as per Clause
1501.2.4.1 (Table 1500.1) of specifications @ 0.90 cum/cum of
concrete (25 mm & 12.5 mm blending)
Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45
cum/cum of concrete
Cement @ 310 kg/cum of concrete
Polythene sheet 125 micron
Mild steel dowel bar 25 mm dia of grade S 240. 500 mm long 20 Nos.
at culvert/bridge slab and at construction joint including 5 per cent
wastage.

75.00 Cum

0.00 day
5.00 day
5.00 day
150.00 day
6.00 day
2.00 day
6.00 day
1.00 day

36.00 hour
9.00 hour
9.00 hour
9.00 hour
4.00 hour
5.00 hour
2.00 hour
67.50 cum

33.75 cum
26.25 t
412.50 sqm

(4 x 20 x 0.500) + 5 per cent wastage = 42 m @ 2.80 kg per m =


117.6 kg.
Bitumen primer @ 200 ml per joint for 23 joints -BMT-H.94

0.118 t

Bituminous sealant 800 ml per joint for 23 joints


Jute rope 12 mm dia including 5 per cent wastage

19.00 litre
90.00 m

Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm (thick) cutout of rubber filler board or similar material including 5 per cent
wastage

90.00 m

Polythene sheathing, covering 2/3rd dowel bars (20x23) and tight fit
including 5 per cent wastage
Plasticizer 0.5 per cent by weight of cement - BMT-H.64

483.00 No.

Curing compound (if used) @ 0.33 litre per sqm


Water for curing

131.25 litre
18.00 kl

337269598.xlsx data-CC road

5.00 kg

122.00 litre

Page 2291 of 3205


Joint filler board 20 mm thick as per IS:1838
(4 x 3.75 x 0.200 = 3 sqm) BMT-U.02

3.00 sqm

d) Formwork @ 3% of (a+b+c)
e&f) Overheads & Contractors Profit
Cost for 75 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/75
#REF!

14.00%

#REF!
Rate per 1 Cum

337269598.xlsx data-CC road

Page 2292 of 3205


18

Supply and placing seperation membrane of impermiable plastic sheeting 125 Micrins thick including cost and con
labour charges under Pavement slab or as directed by the Engineer- in - charge etc., complete-1 Sqm
M-164 -as per local market rate

19

1.00 Sqm

RBR-EECD-15: Construction of earthen shoulders with approved material obtained from borrow pits with all lifts
spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m
Clause 303 MORD / 305 MORTH, by using machinery.
Unit = cum
output
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/hour
Tipper 5.5 cum capacity, 4 trips per hour
Add rate for loading as per item 1.1 (ii)
Add rate for unloading as per item 1.1 (iv)
Dozer D-50 for spreading @ 200 cum per hour
Motor grader for grading @ 200 cum per hour
Water tanker with 6 kl capacity
Three wheel 80-100 kN Static Roller @ 70 cum per hour
c) Material
Water
Compensation for earth taken from private land
d&e) Overheads & Contractors Profit
Cost for 100 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/100
VAT, labour cess and variation of material cost during the execution
etc,.
Rate per 1 Cum

337269598.xlsx data-CC road

100.00 Cum
- day
1.040 day
1.00 hour
4.50 hour
100.00 cum
100.00 cum
0.50 hour
0.50 hour
2.00 hour
1.43 hour

12.000 kl
100.000 cum
14.00%

#REF!

Page 2293 of 3205

KS

SR

cutting and pushing the earth to site of embankment upto a


h requirements of lines, grades and cross-sections as per

384.00

1 No

798.72

#REF!

1 hour

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

ncluding cutting and pushing the earth to side of embankment


e with requirements of lines, grades and cross sections etc.,
o.301 and as directed by the Engineer-in-Charge- (Hydraulic

384.00

1 Nos

798.72

#REF!

1 hour

#REF!

1 Cum
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

D-50 including cutting and pushing the cut earth to site of


e slopes in accordance with the requirements of lines, grades
H / 302 MORD.

384.00

1 Nos

1198.08

#REF!

1 hour

#REF!
#REF!
#REF!
#REF!
337269598.xlsx data-CC road

Page 2294 of 3205


#REF!
#REF!
#REF!

337269598.xlsx data-CC road

Page 2295 of 3205

000 m

um bucket capacity including cutting and loading in tippers,


s and cross-sections, and transporting to the embankment
3 MORD / 301 MORTH

Cum

384.00

1 Nos

798.72

#REF!
#REF!

1 hour
1 hour

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

site from roadway cutting and excavation from drain (not


ed to meet requirement of Tables 300.1 and 300.2 as per

384.00

1 day

199.68

#REF!
#REF!

#REF!

#REF!

1 hour
1 hour
1 hour
1 hour
1 hour

#REF!

1 kl

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

0.00

Rs
#REF!
kment, the input of dozer in the cost of embankment shall be
arth is dumped by tippers from roadway cutting, the input of

337269598.xlsx data-CC road

Page 2296 of 3205

0.13) by mix in place method normal Construction of granular


r on prepared surface, mixing by mix in place method with
ed density complete as per Clause 401.4 as per Technical

450.00
384.00

1 day
1 day
1 day

1116.00
3840.00

#REF!
#REF!

1 hour
1 hour
1 hour
1 hour

#REF!

306.76

1 cum

117795.84

#REF!

1 kl
#REF!
#REF!
#REF!
#REF!
#REF!
Rs

#REF!

ng, unloading charges, cost & conveyance, dumping, labour

82.70

82.70

1 Cum

Rs

82.70
#REF!
0.00
#REF!

Rs

82.70
#REF!
0.00
#REF!

1 Cum

conforming to B.I.S. 458/2003 (rate for meter for effective


e trenches, laying them true to the alignment and gradient,
g cost and conveyance of all material and all labour charges

326.43
71.21

1 Rmt
1 Rmt

226.37

1 Cum

3264.32
712.10
3976.42
679.11

4655.53
337269598.xlsx data-CC road

Page 2297 of 3205

Rs

651.77
5307.30
530.73
530.73

337269598.xlsx data-CC road

Page 2298 of 3205

ming to B.I.S. 458/2003 (rate for meter for effective length)


, laying them true to the alignment and gradient, jointing with
onveyance of all material and all labour charges and all taxes

299.60
108.00

1 Rmt
1 Rmt

2996.00
1080.00

226.37

1 Cum

4076.00
679.11

Rs

4755.11
665.72
5420.83
542.08
542.08

ggregate ) using 40mm size Hard Granite Machine Crushed


gate water etc., to site , seigniorage charges on all materials,
surface to the required level curing etc., complete for finished

5.74
1489.81
791.93
#REF!

1 Kg
1 Cum
1 Cum
1 Kl

929.88
1340.83
356.37

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3549.84
496.98
4046.82
#REF!

Rs
Rs

Rs

#REF!

337269598.xlsx data-CC road

Page 2299 of 3205

arse aggregate ) using 40mm size Hard Granite Machine


rse aggregate water etc., to site , seigniorage charges on all
nishing top surface to the required level curing etc., complete

5.74
1489.81
791.93

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
356.37

338.60

1 hour

338.60

504.00
384.00

1 Nos
1 Nos

50.40
533.76
3363.86
470.94
3834.80
#REF!

Rs
Rs

Rs

#REF!

Kg/Cum of Concrete; coarse and fine aggregate confirming to


Hard Granite Machine Crushed Metal including cost and
ery, vibrating charges, centring charges, all labour charges,
sion, contraction, construction and longitudinal joints and its
perational charges etc. complete for finsihed item of work
antities for cement,course aggregate and fine aggregates
As per mix design, if the cement content is found to be

5.74
1854.81
791.93

1 Kg
1 Cum
1 Cum
1 Kl

2009.00
1483.85
316.77

338.60

1 Hr

451.35

175.40

1 Hr

233.81

504.00
450.00
384.00
160.00

1 Nos
1 Nos
1 Nos
1 Cum

67.03
120.15
1766.40
160.00
Rs

6608.36
925.17
7533.53
#REF!

Rs

#REF!

337269598.xlsx data-CC road

Page 2300 of 3205

ns using 20 mm nominal size Graded hard stone aggregate,


uring for 14 days complete as per drawings and technical
.

5.74
791.93
2009.81
1579.81

1t
1 cum
1 cum
1 cum

2.34
356.37
1085.30
568.73

504.00
450.00

1 day
1 day

50.40
625.50

338.60
816.80

1 hour
1 hour

135.44
326.72
3150.80
110.28
3261.08
456.55
3717.63
#REF!
#REF!

337269598.xlsx data-CC road

Page 2301 of 3205

hickness as per design, over a prepared sub base, with 43


e aggregates conforming to IS : 383, maximum in a concrete
oved mix design, laid in approved fixed side form work (steel
cluding levelling the formwork as per drawing), spreading the
s and finished in continuous operation including provision of
ealant, near approaches to bridge / culvert and construction
nd (where specified) and water finishing to lines and grade as

0.00
504.00
450.00
384.00
384.00
0.00
450.00
0.00

1 day
1 day
1 day
1 day
1 day
1 day
1 day
1 day

0.00
2520.00
2250.00
57600.00
2304.00
0.00
2700.00
0.00

338.60

1 hour

12189.60

0.00
0.00
338.20
0.00
103.00
1145.10

1 hour
1 hour
1 hour
1 hour
1 hour
1 hour

0.00
0.00
3043.80
0.00
515.00
2290.20

1773.81

1 cum

119732.18

791.93

1 cum

26727.64

5740.00
14.00

1t
1 sqm

150675.00
5775.00

0.00

1t

86.00

1 kg

600.00
7.50

1 litre
1m

0.00
430.00
11400.00
675.00

0.00

1m

0.00

0.00

1 No.

0.00

109.00

1 litre

13298.00

0.00
103.00

1 litre
1 kl

0.00
1854.00
337269598.xlsx data-CC road

Page 2302 of 3205


902.00

1 sqm

2706.00
418685.42
12560.60
431246.02
60374.44
491620.46
6554.90
#REF!

3.00%

Rs.

#REF!

337269598.xlsx data-CC road

Page 2303 of 3205

s thick including cost and conveyance of all material and all


complete-1 Sqm
14.00

1 Sqm

14.00

d from borrow pits with all lifts and leads, transporting to site,
300.2 with lead upto 1000 m as per Technical Specification

450.00
384.00

1 day

399.36

#REF!

1 hour

#REF!

#REF!

1 hour
1 cum
1 cum
1 hour
1 hour
1 hour
1 hour

#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#VALUE!
#REF!

112.79

1 kl
1 cum

#VALUE!
11279.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

Rs

#REF!

337269598.xlsx data-CC road

Building Data
0
0
0
Qty

1 BLD-CSTN-1 - MORTARS
1

BLD-CSTN-1-1 ( 1 ) - CEMENT MORTAR (1:1)


Cement
Sand
Man mazdoor for Mixing Mortar

1440 Kg
1.05 Cum
0.20 Nos
Rate per cu.m.

BLD-CSTN-1-1 ( 2 ) - CEMENT MORTAR (1:1.5)


Cement
Sand
Man mazdoor

960 Kg
1.05 Cum
0.2 Nos
Rate per cu.m.

BLD-CSTN-1-1 ( 3 ) - CEMENT MORTAR (1:2)


Cement
Sand
Man mazdoor

720 Kg
1.05 Cum
0.2 Nos
Rate per cu.m.

BLD-CSTN-1-1 ( 4 ) - CEMENT MORTAR (1:3)


Cement
Sand
Man mazdoor

480 Kg
1.05 Cum
0.2 Nos
Rate per cu.m.

BLD-CSTN-1-1 ( 5 ) - CEMENT MORTAR (1:4)


Cement
Sand
Man mazdoor

360 Kg
1.05 Cum
0.2 Nos
Rate per cu.m.

BLD-CSTN-1-1 ( 6 ) - CEMENT MORTAR (1:5)


Cement
Sand
Man mazdoor

288 Kg
1.05 Cum
0.2 Nos
Rate per cu.m.

BLD-CSTN-1-1 ( 7 ) - CEMENT MORTAR (1:6)


Cement
Sand
Man mazdoor

240 Kg
1.05 Cum
0.2 Nos
Rate per cu.m.

BLD-CSTN-1-1 ( 8 ) - CEMENT MORTAR (1:8)


Cement
Sand
Man mazdoor

180 Kg
1.05 Cum
0.2 Nos
Rate per cu.m.

2 BLD-CSTN-2 - EARTH WORK EXCAVATION & REFILLING


9

BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on bank for all lifts and with an i
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
charges etc as per SS - 20 B (APSS 308). Ordinary Soil-Manual Means-Upto 3 m depth
Ordinary Soil-Manual Means-Upto 3 m depth

out put

a)Labour
Mate
Mazdoor (Unskilled) (excluding LC )
Add Labour component @
Sub total
extra for foundations @

10.00
0 day
3.64 day.
20%
75%

Sub - Total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
10

14%

BLD-CSTN-2-2 (10) : Earth work excavation for foundations and depositing on bank for all lifts and with an i
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
charges etc as per SS - 20 B (APSS 308). Ordinary soils-Mechcanical Means-Upto 3 m depth
Ordinary soils-Mechcanical Means-Upto 3 m depth

out put

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

240

0 day.
8.32 day.
6.00 hours
Sub - Total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering
11

14%

BLD-CSTN-2-3 (11) : Earth work excavation for foundations and depositing on bank for all lifts and with an i
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
charges etc as per SS - 20 B (APSS 308). Ordinary soils-Mechcanical Means-Upto 3 m to 6m depth
Ordinary soils-Mechcanical Means-Upto 3 m to 6m depth

out put

a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

0 day.
8.32 day.
6.00 hours
Sub - Total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering

14%

210

12

BLD-CSTN-2-4 (12) ; Earth work excavation for foundations and depositing on bank for all lifts and with an i
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
charges etc as per SS - 20 B (APSS 308). Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth
Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m
out put
depth
a)Labour
Mate
0 day.
Mazdoor (Unskilled) (excluding LC )
5.20 day.
Add Labour component @
20%
Sub total
extra for foundations @
75%
Sub - Total
c&d) Overheads & Contractors Profit
14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering

13

BLD-CSTN-2-5 - (13) : Earth work excavation for foundations and depositing on bank for all lifts and with an
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
charges etc as per SS - 20 B (APSS 308).
Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m
depth
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering

14

10.00

out put

180

0 day.
6.24 day.
6.00 hours
14%

BLD-CSTN-2-6 - (14): Earth work excavation for foundations and depositing on bank for all lifts and with an
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
charges etc as per SS - 20 B (APSS 308).
Hard rock (requiring blasting)-Upto 3 m depth
a)Labour
Mate
Driller
Blaster
Mazdoor (Unskilled)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers
c) Materials
Gelatin 80 per cent - M-104
Electric Detonators @ 1 detonator for 2 gelatine sticks of 285 gm each
-M-094
Sub total
d) Overheads & Contractors Profit
Sub - Total
Cost for 10 cum = a+b+c+d
Rate per 1 Cum excluding Dewatering

out put
0 day.
0.50 day.
0.25 day.
8.35 day.
1 hours
3.50 Kg
14 Nos.

14%

10

15

BLD-CSTN-2-7 - (15) : Earth work excavation for foundations and depositing on bank for all lifts and with an
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
charges etc as per SS - 20 B (APSS 308).
Hard rock (blasting prohibited)-Upto 3 m depth
out put
a)Labour
Mate
0.00 day
Mazdoor (Unskilled)
5.20 day
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers of pneumatic
6.00 hour
breaker at 1 cum per hour
sub total ; a+b
c&d) Overheads & Contractors Profit
14%
Cost for 10 cum = a+b+c+d
Rate per cum = a+b+c+d+e)/10
Rate per 1 Cum excluding Dewatering

16

10.00

BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layer
each deposited layer by watering and ramming including cost and conveyance of water to work site and all o
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

6.00

Sand Filling in Foundations

Sand Filling
a) Material

BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in laye
each deposited layer by watering and ramming including cost and conveyance of water to work site and all o
charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

Sand

6.00 Cum

b)Labour
Mate
Mazdoor (Unskilled)

0.00 day
0.31 day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

14%

Rate per 1 Cum

Stone Dust Filling

out put

6.00

Gravel filling

a) Material
Gravel

6.00 Cum

b)Labour
Mate
Mazdoor (Unskilled)

0.00 day
0.31 day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6

14%

Rate per 1 Cum

17

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundat
not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and
operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO
Earth filling (ordinary soil)

e filling

b)Labour
Mate

out put

6.00
0.00 day

Re filling

Mazdoor (Unskilled)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
Rate per 1 Cum

0.31 day
14%

3 BLD-CSTN-3, CONCRETE, DAMP PROOF COURSE & REINFORCEMENT


18

BLD-CSTN-3-1 (18) -Hand mixing : Plain Cement concrete Grade M-20 Nominal Mix using 20mm size Har
cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage cha
mixing , laying, concrete , ramming and curing etc., complete for finished item of work.
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 20mm
Fine aggregate (Sand)
Water (including for curing)

400.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

19

BLD-CSTN-3-2 (19) -using concrete mixer up to Plinth Level : Plain Cement concrete Grade M10 Nominal
Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggreg
on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to
finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

220.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

20

BLD-CSTN-3-3 (20) Hand Mixing: Plain Cement concrete Grade M15 Nominal mix 1:2.5:5 using 40mm, 2
Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to
labour charges , for mixing , laying, concrete , ramming and curing etc., complete for finished item of work.
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm
Coarse aggregate 20mm
Coarse aggregate 10mm
Coarse sand
Water (including for curing)

275.00 Kg
0.54 Cum
0.27 Cum
0.09 Cum
0.48 Cum
1.20 Kl

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
2.36 day

Sub - Total
c.Overheads & Contractors Profit
Grand Total

14%
Rate per One Cum

21

BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level: Plain Cement concrete nominal mix (1:4:8) prop (Cemen
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers
curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm
Fine aggregate (Sand)
Water (including for curing)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

22

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concr
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

23

BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (C
using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cem
site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm
level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm
Fine aggregate (Sand)
Water (including for curing)

129.60 Kg
0.90 Cum
0.54 Cum
1.20 Kl

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit

14%

Grand Total
Rate per One Cum

24

BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal m
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concr
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

25

BLD-CSTN-3-8 ( 25 ) -Hand mixing up to Plinth Level: Plain Cement concrete nominal mix (1:6:10) prop (C
using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cem
site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm
level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm
Fine aggregate (Sand)
Water (including for curing)

108.00 Kg
0.90 Cum
0.54 Cum
1.20 Kl

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

26

BLD-CSTN-3-9-(26) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal m
coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concr
surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

108.00 Kg
0.90 Cum
0.54 Cum
1.20 Kl
1 hour

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

27

BLD-CSTN-3-10- ( 27 ) Hand mixing - Nominal: Plain Cement concrete nominal mix (1:3:6) prop (Cement
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers
curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Water (including for curing)

220.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

28

BLD-CSTN-3-11-(28) Using Concrete mixture : Plain Cement concrete (1:2:4) mix (Cement : fine aggregate
Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coars
charges on all materials, labour charges , for mixing , laying, concrete l curing etc., complete for finished item of
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

14%
Rate per One Cum

29

BLD-CSTN-3-12-(29) Using Concrete mixture: Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement
20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like ce
site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm
level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour

B. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Grand Total

0%
Rate per One Cum

BLD-CSTN-3-13 - R.C.C. M-20 Nominal Mix

30

BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate
20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales
operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete bu
charges for finished item of work, but excluding centering, shuttering fo FOUNDATIONS, PLINTH, PEDESTALS

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20 GRADE OF MIX
20mm HBG graded metal
Sand
Cement
1st Class Mason
2nd Class Mason
Mazdoor (Both Men & Women)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Vibrator hire charges
Water (including for curing)
BASIC COST per 1 cum
a

Footings
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component on Labour charges @

0.90 Cum
0.45 Cum
400.00 Kg
0.133 day.
0.267 day.
3.60 day.
1.000 hour
1.000 hour
1.20 Kl

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


b

Pedastals
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


c

Plinth beams
R.C.C. M 20 nominal mix Per Cum
Centering charges, Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - WOODEN SCAFFOLDING

A. MATERIALS:
20mm HBG graded metal
Sand
Cement

0.90 cum
0.45 cum
400.00 Kgs
Sub Total of - A

B. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)

0.167 day
0.167 day
4.700 day
Sub Total of - B

C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Vibrator hire charges
Water (including for curing)

1.00 hour
1.00 hour
1.20 kl
Sub Total of - C

BASIC COST per 1 cum


D. Overheads & Contractors Profit

14%
Total

Rate per One Cum


a

Columns up to 3.66 Mts unsupported height above GL - Wooden Scaffolding


R.C.C. M 20 nominal mix Per Cum
Material charges for Centering & Scaffolding, Pg No.89 (Wooden
scaffolding)
Labour charges for Centering & Scaffolding,Pg No.89
Add Labour component @
Basic Cost
Overheads & Contractors Profit
Rate per One Cum
Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1.00 Cum
1.00 Cum
1.00 Cum
20%
14%

1F
6923.42
#REF!

2F
6923.42

#VALUE!

#REF!
#REF!
#VALUE!

196.412

392.824

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

Lintels up to 3.66 Mts unsupported height above GL


R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
6923.42

2F
6923.42

#REF!
#REF!

#REF!
#REF!
#REF!

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

196.412

392.824

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
d

RCC Walls of Height up to 3.66 Mts un supported Height


Basic Cost
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
6923.42
#REF!
#REF!
#REF!

2F
6923.42

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

196.412

392.824

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615

Rate per One Cum


e

#REF!

#REF!

RCC Walls of Height up to 7.32 Mts un supported Height


Rate per One Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00
Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

RCC SLABS, BEAMS -WOODEN SCAFFOLDING

A. MATERIALS:
20mm HBG graded metal
Sand
Cement

0.90 cum
0.45 cum
400.00 Kgs
Sub Total of - A

B. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)

0.067 day
0.133 day
2.500 day
Sub Total of - B

C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
Vibrator hire charges
Water (including for curing)

0.267 hour
0.267 hour
1.200 kl
Sub Total of - C

BASIC COST per 1 cum


Overheads & Contractors Profit

14%
Total

Rate per One Cum


a
i

RCC Dome
RCC Dome up to 3.66 Mts height
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
5636.16
#REF!
#REF!
#REF!

2F
5636.16

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

b
i
i

RCC SLABS

RCC M 20 Slabs up to 3.66 Mts unsupported height above GL


RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

115 mm
1.00 Cum
8.70 Sqm
8.70 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
5636.16
#REF!
#REF!
#REF!

2F
5636.16

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
ii

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

125 mm
1.00 Cum
8.00 Sqm
8.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
5636.16
#VALUE!
#REF!
#REF!

2F
5636.16

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )

#REF!
#REF!
#REF!

Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

#VALUE!
#VALUE!
#VALUE!

#REF!
#REF!
#REF!

vi

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

175 mm
1.00 Cum
5.71 Sqm
5.71 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
5636.16
890.76
#REF!
#REF!

2F
5636.16
890.76
#REF!
#REF!
#REF!

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
ix

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

325 mm
1.00 Cum
3.08 Sqm
3.08 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
5636.16
505.12
#REF!
#REF!

2F
5636.16
505.12
#REF!
#REF!
#REF!

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

#REF!
#REF!

#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615

Rate per One Cum

#REF!

#REF!

C
i

RCC Beams:
RCC Beams up to 3.66 Mts height
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
5636.16
1342.00
#REF!
#REF!

2F
5636.16
1342.00
#REF!
#REF!
#REF!

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
D

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end - up to 3.66m above GL
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%
Total

Rate per One Sqm


Rate for other Floors
R.C.C. M 20 nominal mix Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
352.26
#REF!
#REF!
#REF!

2F
352.26

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

105.36

210.72

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end above 3.66m and upto 7.32m above GL
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%
Total

Rate per One Sqm

BLD-CSTN-3-14 - DESIGN MIX CONCRETE (WEIGH BATCH at SITE)


31

BLD-CSTN-3-14-(31) - A
Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXE
hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including a
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and
work (APSS No. 402)with minimum cement content as per IS code fo FOUNDATIONS, PLINTH, PEDESTALS

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20GRADE OF MIX
20mm HBG graded metal
Sand
Cement
1st Class Mason
2nd Class Mason
Mazdoor (Both Men & Women)
Weigh batcher hire charges, machine mixing charges
Vibrator hire charges
Water (including for curing)
BASIC COST per 1 cum

0.80 Cum
0.40 Cum
350.00 Kg
0.133 day.
0.267 day.
4.60 day.
1.333 hour
1.333 hour
1.20 Kl

Footings
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


b

Pedastals
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


c

Plinth beams
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Sub - Total
Overheads & Contractors Profit

14%
Total

Rate per One Cum

BLD-CSTN-3-15- ( 31 ) -B
Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXE
hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including a
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and
work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, R

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS:
20mm HBG graded metal
Sand
Cement

0.80 cum
0.40 cum
350.00 Kgs
Sub Total of - A

B. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)

0.167 day
0.167 day
5.600 day
Sub Total of - B

C. MACHINERY
Weigh batcher hire charges, machine mixing charges
Vibrator hire charges
Water (including for curing)

1.333 hour
1.333 hour
1.20 kl
Sub Total of - C

BASIC COST per 1 cum


D. Overheads & Contractors Profit

14%
Total

Rate per One Cum


a

Columns up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Material charges for Centering & Scaffolding, Pg No.89 (Steel
scaffolding)
Labour charges for Centering & Scaffolding,Pg No.89
Add Labour component @
Basic Cost
Overheads & Contractors Profit
Rate per One Cum

1.00 Cum
1.00 Cum
1.00 Cum
20%
14%

Rate for other Floors


R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
6928.10
341.00
1603.00
320.60

2F
6928.10
341.00
1763.00
352.60
160.30

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

230.97

461.94

9423.67
1283.03

10006.94
1362.44

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615

Rate per One Cum

10706.70

11369.40

Columns up to 7.32 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Material charges for Centering & Scaffolding, Pg No.75 (Steel
scaffolding)
Labour charges for Centering & Scaffolding,Pg No.75
Add Labour component @
Basic Cost
Overheads & Contractors Profit
Rate per One Cum

1.00 Cum
20%
14%

Rate for other Floors


R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
10587.50
#REF!
#VALUE!

#REF!
#REF!
#VALUE!

Total

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

Overheads & Contractors Profit @ 0.13615


Rate per One Cum
c

1.00 Cum
1.00 Cum

2F
10587.50

Lintels up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
6928.10
1133.00
1144.00
228.80
230.97

2F
6928.10
1133.00
1255.00
251.00
114.40
461.94

9664.87
1315.87
10980.75

10143.44
1381.03
11524.50

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

RCC Walls of Height up to 3.66 Mts un supported Height


Basic Cost
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
6928.10
#REF!
#REF!
#REF!

2F
6928.10

230.97

461.94

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
e

RCC Walls of Height up to 7.32 Mts un supported Height


Rate per One Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

BLD-CSTN-3-16-(31)-C
Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXE
hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including a
such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and
work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the
shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges
BEAMS

RCC SLABS, BEAMS


A. MATERIALS:
20mm HBG graded metal
Sand
Cement

0.80 cum
0.40 cum
350.00 Kgs
Sub Total of - A

B. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)

0.067 day
0.133 day
3.077 day
Sub Total of - B

C. MACHINERY
Weigh batcher hire charges, machine mixing charges
Vibrator hire charges
Water (including for curing)

0.308 hour
0.308 hour
1.200 kl
Sub Total of - C

BASIC COST per 1 cum


Overheads & Contractors Profit

14%
Total

Rate per One Cum

a
i

RCC Dome
RCC Dome up to 3.66 Mts height
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
3681.00
#REF!
#REF!
127.52

2F
5366.72
3681.00
#REF!
#REF!
#REF!
255.04

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
ii

RCC Dome above 3.66 to 7.32 Mts height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

b RCC SLABS
b-I RCC Slabs up to 3.66 Mts unsupported height above GL
i RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @
Sub - Total
Overheads & Contractors Profit
Total
Rate per One Cum
Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

75 mm
1.00 Cum
13.33 Sqm
13.33 Sqm
20%
14%

1F
5366.72
3025.91
2026.16
405.23
127.52

2F
5366.72
3025.91
2226.11
445.22
202.62
255.04

10951.54
1491.05
12442.60

11521.62
1568.67
13090.30

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
ii

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

115 mm
1.00 Cum
8.70 Sqm
8.70 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
1974.90
1322.40
264.48
127.52

2F
5366.72
1974.90
1452.90
290.58
132.24
255.04

9056.02
1232.98
10289.00

9472.38
1289.66
10762.05

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
iii

RCC M 20 Slabs
R.C.C. M 20 Per Cum

120 mm
1.00 Cum

Centering charges ,Pg No.89


Labour charges,Pg No.89
Add Labour component @

8.33 Sqm
8.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

Rate for other Floors


R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
1890.91
1266.16
253.23
127.52

2F
5366.72
1890.91
1391.11
278.22
126.62
255.04

8904.54
1212.35
10116.90

9308.62
1267.37
10576.00

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
iv

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

140 mm
1.00 Cum
7.14 Sqm
7.14 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
1620.78
#REF!
#REF!
127.52

2F
5366.72
1620.78
#REF!
#REF!
#REF!
255.04

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
v

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

150 mm
1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

Rate for other Floors


R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
1514.09
1013.84
202.77
127.52

2F
5366.72
1514.09
1113.89
222.78
101.38
255.04

8224.94
1119.83
9344.80

8573.90
1167.34
9741.25

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
vi

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

175 mm
1.00 Cum
5.71 Sqm
5.71 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
1330.43
#REF!
#REF!
127.52

2F
5366.72
1330.43
#REF!
#REF!
#REF!
255.04

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

vii RCC M 20 Slabs


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

200 mm
1.00 Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
1165.00
#REF!
#REF!
127.52

2F
5366.72
1165.00
#REF!
#REF!
#REF!
255.04

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
viii RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

250 mm
1.00 Cum
4.00 Sqm
4.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
932.00
#REF!
#REF!
127.52

2F
5366.72
932.00
#REF!
#REF!
#REF!
255.04

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
ix

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89

325 mm
1.00 Cum
3.08 Sqm
3.08 Sqm

Add Labour component @

20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

Rate for other Floors


R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
751.52
#REF!
#REF!
127.52

2F
5366.72
751.52
#REF!
#REF!
#REF!
255.04

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
B -II RCC Slabs up to 7.32 Mts unsupported height above GL
i

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

75 mm
1.00 Cum
13.33 Sqm
13.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


ii

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

100 mm
1.00 Cum
10.00 Sqm
10.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


iii

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

120 mm
1.00 Cum
8.33 Sqm
8.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


iv

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

125 mm
1.00 Cum
8.00 Sqm
8.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

150 mm
1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

vi

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

175 mm
1.00 Cum
5.71 Sqm
5.71 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


vii RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

300 mm
1.00 Cum
3.33 Sqm
3.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


viii RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

350 mm
1.00 Cum
2.86 Sqm
2.86 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


C
i

RCC Beams:
RCC Beams up to 3.66 Mts height
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
5366.72
2002.00
1344.00
268.80
127.52

2F
5366.72
2002.00
1478.00
295.60
134.40
255.04

9109.04
1240.20
10349.25

9531.76
1297.75
10829.55

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

ii

RCC Beams up to 7.32 Mts height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

Rate for other Floors


R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
iii

1F
5366.72
3607.00
#REF!
#REF!
#REF!
#REF!
#REF!

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @
Overheads & Contractors Profit

2F
5366.72
3607.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%
14%

Total
Rate per One Sqm
Rate for other Floors
R.C.C. M 25 Per 0.0625Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate

1F
335.42
224.00
175.00
35.00
7.97

2F
335.42
224.00
193.00
38.60
17.50
15.94

777.39
105.84
883.25

824.46
112.25
936.75

For Mechanical Lifting of all RCC items: Lift Charges of Materials only,
for lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire
charges shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 367.40 )
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
D

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end above 3.66m and upto 7.32m above GL
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%
Total

Rate per One Sqm

BLD-CSTN-3-17 - DESIGN MIX CONCRETE (BATCHING PLANT at site)

BLD-CSTN-3-17-(31) -D
Supply and placing of the Design Mix Concrete corresponding to IS 456 using Batching plant at site with 20mm
metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, in
batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication c
402)with minimum cement content as per IS code from standard suppliers approved by the department inclu
concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished
PEDESTALS

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20GRADE OF MIX
A. MATERIALS:
20mm HBG graded metal
Sand
Cement
Admixtures @ 0.4% of weight of cement
Water
B.MACHINARY
Batching plant at 20 cum per hour
Transit mixer 4cum capacity for lead upto 1km
Concrete Pump
C. LABOUR
1st Class Mason
2nd Class Mason
Mazdoor (Both Men & Women)

0.80 Cum
0.40 Cum
350.00 Kg
1.40 Kg
1.20 Kl
0.222 hour
0.222 hour
0.222 hour
0.056 day.
0.056 day.
0.917 day.
BASIC COST per 1 cum

Footings
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


b

Pedastals
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


c

Plinth beams
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

BLD-CSTN-3-18- ( 31 ) - E
Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using Batching plant at site wit
granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like ceme
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operatio
weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fab
(APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC W

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS:
20mm HBG graded metal
Sand
Cement
Water (including for curing)

0.80 cum
0.40 cum
350.00 Kgs
1.20 kl
Sub Total of - A

B. MACHINERY
Batching plant at 20 cum per hour
Transit mixer 4cum capacity for lead upto 1km
Concrete Pump

0.444 hour
0.444 hour
0.444 hour
Sub Total of - C

C. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)

0.111 day
0.222 day
1.556 day
Sub Total of - B

BASIC COST per 1 cum


D. Overheads & Contractors Profit

14%
Total

Rate per One Cum

Columns up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Material charges for Centering & Scaffolding, Pg No.89 (Steel
scaffolding)
Labour charges for Centering & Scaffolding,Pg No.89
Add Labour component @
Basic Cost
Overheads & Contractors Profit
Rate per One Cum
Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on Total
First
Floor Rate (7.32 M) shall be allowed
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

1.00 Cum
20%
14%

1F
#REF!
#REF!

2F
#REF!
#REF!
#REF!
160.30
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!

Columns up to 7.32 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Material charges for Centering & Scaffolding, Pg No.89 (Steel
scaffolding)
Labour charges for Centering & Scaffolding,Pg No.89
Add Labour component @
Basic Cost
Overheads & Contractors Profit
Rate per One Cum

1.00 Cum
1.00 Cum
1.00 Cum
20%
14%

Rate for other Floors


R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
#REF!
#REF!
#REF!
#REF!

Total

#REF!
#REF!
#REF!

Overheads & Contractors Profit @ 0.13615


Rate per One Cum
c

1.00 Cum
1.00 Cum

2F
#REF!
#REF!
#REF!
#VALUE!

#REF!
#REF!
#REF!

Lintels up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2

1F
#REF!

2F
#REF!

#REF!
#REF!

#REF!
#REF!

For Material lift Charges & Labour rate for scaffolding


Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

#REF!
#REF!
#REF!

114.40
#REF!
#REF!
#REF!

RCC Walls of Height up to 3.66 Mts un supported Height


Basic Cost
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


e

RCC Walls of Height up to 7.32 Mts un supported Height


Rate per One Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

BLD-CSTN-3 -19 -(31) - F


Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using Batching plant at site wit
granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like ceme
water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operatio
weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fab
(APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the departme
laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished

RCC SLABS, BEAMS


A. MATERIALS:
20mm HBG graded metal
Sand
Cement
Water (including for curing)

0.80 cum
0.40 cum
350.00 Kgs
1.200 kl
Sub Total of - A

B. MACHINERY
Batching plant at 20 cum per hour
Transit mixer 4cum capacity for lead upto 1km
Concrete Pump

0.444 hour
0.444 hour
0.444 hour
Sub Total of - B

C. LABOUR:
1st Class Mason
2nd Class Mason
Mazdoor (Both Men and Women)

0.067 day
0.133 day
3.077 day
Sub Total of - C

BASIC COST per 1 cum


Overheads & Contractors Profit

14%
Total

Rate per One Cum

a
i

RCC Dome
RCC Dome up to 3.66 Mts height
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding

1F
#REF!
#REF!
#REF!
#REF!
Total

Overheads & Contractors Profit @ 0.13615


Rate per One Cum
ii

RCC Dome above 3.66 to 7.32 Mts height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

#REF!
#REF!
#REF!

2F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


b RCC SLABS
b-I RCC Slabs up to 3.66 Mts unsupported height above GL
i RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges, Pg No.89
Labour charges, Pg No.89
Add Labour component @
Sub - Total
Overheads & Contractors Profit
Total
Rate per One Cum
Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

75 mm
1.00 Cum
13.33 Sqm
13.33 Sqm
20%
14%

1F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

2F
#REF!
#REF!
#REF!
202.62
#REF!
#REF!
#REF!

ii

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

100 mm
1.00 Cum
10.00 Sqm
10.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
iii

1F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

2F
#REF!
#REF!
#REF!
132.24
#REF!
#REF!
#REF!

120 mm
1.00 Cum
8.33 Sqm
8.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
iv

1F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

2F
#REF!
#REF!
#REF!
126.62
#REF!
#REF!
#REF!

125 mm
1.00 Cum
8.00 Sqm
8.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

1F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!

2F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

150 mm
1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
vi

1F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

2F
#REF!
#REF!
#REF!
101.38
#REF!
#REF!
#REF!

175 mm
1.00 Cum
5.71 Sqm
5.71 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

1F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

vii RCC M 20 Slabs


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

2F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

200 mm
1.00 Cum
5.00 Sqm
5.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

1F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!

2F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

viii RCC M 20 Slabs


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

250 mm
1.00 Cum
4.00 Sqm
4.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
ix

1F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

2F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

325 mm
1.00 Cum
3.08 Sqm
3.08 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

1F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

B -II RCC Slabs up to 7.32 Mts unsupported height above GL


i

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

75 mm
1.00 Cum
13.33 Sqm
13.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


ii

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

100 mm
1.00 Cum
10.00 Sqm
10.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

2F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rate per One Cum

iii

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

120 mm
1.00 Cum
8.33 Sqm
8.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


iv

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

125 mm
1.00 Cum
8.00 Sqm
8.00 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


v

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

150 mm
1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


vi

RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

175 mm
1.00 Cum
5.71 Sqm
5.71 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


vii RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

300 mm
1.00 Cum
3.33 Sqm
3.33 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


viii RCC M 20 Slabs
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

350 mm
1.00 Cum
2.86 Sqm
2.86 Sqm
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum

C
i

RCC Beams:
RCC Beams up to 3.66 Mts height
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
ii

1F
#REF!

2F
#REF!

#REF!
#REF!

#REF!
#REF!
134.40
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

RCC Beams up to 7.32 Mts height


R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Total

Overheads & Contractors Profit

14%
Total

Rate per One Cum


Rate for other Floors
R.C.C. M 20 Per Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum
D

1F
#REF!

2F
#REF!

#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end - up to 3.66m above GL
R.C.C. M 20 Per Cum
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%
Total

Rate per One Sqm


Rate for other Floors
R.C.C. M 25 Per 0.0625Cum
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.2
For Material lift Charges & Labour rate for scaffolding

1F
#REF!
#REF!
#REF!
#REF!

2F
#REF!
#REF!
#REF!
17.50

Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end - above 3.66m and up to 7.32m above GL
Rate for other Floors
Centering charges ,Pg No.89
Labour charges,Pg No.89
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%
Total

Rate per One Sqm

Note : Quantity of cement proposed for various design mixes is for estimating purpose only. Actual quantity of c
Similarly quantity for coarse and fine aggregates is for estimating purpose and the exact quantity shall be as per
is to be used with adequate supervision and quality control requirements.
For Design mix concrete, allow Cement as follows (for estimate purpose
only) :

Grade
M20
M25
M30
M35
M40

32

BLD-CSTN-3-20 - (32) - Damp proof course 40mm thick with cement concrete (1:2:4 Nominal mix), using 12mm
of all materials, seigniorage charges, excluding conveyance charges of materials, including the cost of ma
position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)
Unit

25 Sqm

A. MATERIALS:

Cement
Coarse aggregate 12mm
Fine aggregate (Sand)
Farm work ( Ls )

320.00 Kg
0.90 Cum
0.45 Cum
Sub Total of - A

B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

1.00 hour
Sub Total of - B

C. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.10 day.
1.98 day.
Sub Total of - C

Total A+B+C
c.Overheads & Contractors Profit

14%
Total for 25 Sqm

Rate per One Sqm


33

BLD-CSTN-3-21 - (33) - Damp proof course 40mm thick with cement concrete (1:2:4 Nominal mix), using 12mm
of all materials, seigniorage charges, excluding conveyance charges of materials, including the cost of ma
position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)
Unit

20 Sqm

A. MATERIALS:

Cement
Coarse aggregate 12mm
Fine aggregate (Sand)
Farm work ( Ls )

320.00 Kg
0.90 Cum
0.45 Cum
Sub Total of - A

B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity

1.00 hour

Sub Total of - B
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)

0.10 day.
1.98 day.
Sub Total of - C

Total A+B+C
c.Overheads & Contractors Profit

14%
Total for 20 Sqm

Rate per One Sqm


34

BLD-CSTN-4-1-(34)
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of dif
labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover
tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including c
blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including
complete for finished item of work in all floors.( APSS No.126 - where they are not welded.

Unit = 1 MT
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire- SSR (Irrigation) item No 3, Pg 233
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Blacksmith / Bar bender
Mazdoor (Unskilled)

1.05 Ton
6.00 kg

10.00 day
10.00 day

(c) Labour allowance on B (included in labour rates)

(d) Contractors profit on (a+b+c)


Rate per t = a+b+c+d
Rate per One MT
Rate per One Kg
35

14%

BLD-CSTN-4-1-(35) : Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415/ Fe 500 grade as p
RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placin
materials and size and tying and welding using electrodes, forming grills for reinforcement work as per approve
conveyance of steel bars, including all wastages such as overlaps, couplings, welding, chairs, spacer bars incl
cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, wel
materials etc., complete for finished item of work in all floors.( APSS No.126 - where welding required to be do

Unit = 1 MT
(a) Material
HYSD bars including 2.5 per cent for wastage
Welding Electrodes @ 5 per joint (14 joints / ton)
Welding Charges (Hire charges of Welding Machine)
Binding wire- SSR (Irrigation) item No 3, Pg 233
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Welder
Blacksmith / Bar bender
Mazdoor (Unskilled)

1.025 Ton
70.000 Nos
10.000 hours
3.00 kg

2.50 day
10.00 day
10.00 day

(c) Labour allowance on B (included in labour rates)

(d) Contractors profit on (a+b+c)


Rate per t = a+b+c+d
Rate per One MT

14%

Rate per One Kg

36

BLD-CSTN-4-2-(36) :: Providing Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS
works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in posi
and size and tying and welding using electrodes, forming grills for reinforcement work as per approved
conveyance of steel bars, including all wastages such as overlaps, couplings, welding, chairs, spacer bars incl
cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, wel
materials etc., complete for finished item of work in all floors.( APSS No.126 - where they are not welded.

Unit = 1 MT
(a) Material
TMT bars including 5 per cent for overlaps and wastage
Binding wire- SSR (Irrigation) item No 3, Pg 233
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Blacksmith / Bar bender
Mazdoor (Unskilled)

1.05 Ton
6.00 kg

10.00 day
10.00 day

(c) Labour allowance on B (included in labour rates)

(d) Contractors profit on (a+b+c)


Rate per t = a+b+c+d
Rate per One MT
Rate per One Kg
37

14%

BLD-CSTN-4-2-(37) : Providing Thermo Mechanically Treated (TMT) steel bars (Fe 415/ Fe 500 grade as per IS
works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in posi
and size and tying and welding using electrodes, forming grills for reinforcement work as per approved
conveyance of steel bars, including all wastages such as overlaps, couplings, welding, chairs, spacer bars incl
cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, wel
materials etc., complete for finished item of work in all floors.( APSS No.126 - where welding required to be do

Unit = 1 MT
(a) Material
TMT bars including 2.5 per cent for wastage
Welding Electrodes @ 5 per joint (14 joints / ton)
Welding Charges (Hire charges of Welding Machine)
Binding wire- SSR (Irrigation) item No 3, Pg 233
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Welder
Blacksmith / Bar bender
Mazdoor (Unskilled)

1.025 Ton
70.000 Nos
10.000 hours
3.00 kg

2.50 day
10.00 day
10.00 day

(c) Labour allowance on B (included in labour rates)

(d) Contractors profit on (a+b+c)


Rate per t = a+b+c+d
Rate per One MT
Rate per One Kg

14%

38

BLD-CSTN-4-3-(38) :: Providing Mild Steel (MS bars as per IS 1786-1979) of different diameters for RCC works
cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and s
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance o
overlaps, couplings, welding, chairs, spacer bars including cost and conveyance of binding wire, cover blocks an
such as cutting, bending, placing in position, welding including sales and other taxes on all materials etc., com
( APSS No.126 - where they are not welded.
Unit = 1 MT
(a) Material
MS bars including 5 per cent for overlaps and wastage

1.05 Ton

Binding wire- SSR (Irrigation) item No 3, Pg 233


B) LABOUR for cutting, bending, shifting to site, tying, lap splicing
and placing in position
Blacksmith / Bar bender
Mazdoor (Unskilled)

6.00 kg

10.00 day
10.00 day

(c) Labour allowance on B (included in labour rates)

(d) Contractors profit on (a+b+c)


Rate per t = a+b+c+d
Rate per One MT
Rate per One Kg

14%

5 BLD-CSTN- 5 - BRICK WORK, HONEY - COMBWORK

BLD-CSTN-5-1 (39) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mo
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, inclu
Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:6)

39

A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)

96.00 Kg
512 Nos
0.20 Cum
Sub Total of - A

B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.24 day.
0.56 day.
1.89 day.
Sub Total of - B

Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum

14%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component @
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
4214.55
43.17
255.04
51.01

2F
4214.55
43.17
361.00
72.20
127.52

Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

4563.78
621.36
5185.15

4818.45
656.03
5474.50

BLD-CSTN-5-2 (40)
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:4 Prop includ
Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour cha
charges lift charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:4)

40

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)

72.00 Kg
512 Nos
0.20 Cum
Sub Total of - A

B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.24 day.
0.56 day.
1.89 day.
Sub Total of - B

Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum

14%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component @
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
4076.79
43.17
255.04
51.01

2F
4076.79
43.17
361.00
72.20
127.52

Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

4426.02
602.60
5028.65

4680.69
637.28
5318.00

BLD-CSTN-5-3 (41)
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:5 Prop includ
Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour cha
charges lift charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:4)

41

A. MATERIALS:

A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)

57.60 Kg
512 Nos
0.20 Cum
Sub Total of - A

B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.24 day.
0.56 day.
1.89 day.
Sub Total of - B

Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component @

14%

1F
3994.13
43.17
255.04
51.01

2F
3994.13
43.17
361.00
72.20

For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

127.52

4343.36
591.35
4934.75

4598.03
626.02
5224.05

BLD-CSTN-5-4-(42)
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop includ
Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour cha
charges lift charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:6)

42

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

48.00 Kg
512 Nos
0.20 Cum
0.24 day.
0.56 day.
1.89 day.
14%

1F
3939.03
43.17
255.04
51.01

2F
3939.03
43.17
361.00
72.20
127.52

4288.26
583.85
4872.15

4542.93
618.52
5161.45

BLD-CSTN-5-5-(43)
Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:8 Prop includ
Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour cha
charges lift charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:8)

43

A. MATERIALS:

A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

36.00 Kg
512 Nos
0.20 Cum
0.24 day.
0.56 day.
1.89 day.
14%

1F
3870.15
43.17
255.04
51.01
0.00

2F
3870.15
43.17
361.00
72.20
127.52

4219.38
574.47
4793.85

4474.05
609.14
5083.20

BLD-CSTN-5-6 (44)
Brick Masonary 2nd Class Modular Bricks 19 x 9 x 9 cms 2nd class in Cement Mortor 1:3 Prop including Cost
Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like m
charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:6)

44

A. MATERIALS:

Cement
Modular Bricks 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)

100.60 Kg
520 Nos
0.21 Cum
Sub Total of - A

B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.24 day.
0.56 day.
1.89 day.
Sub Total of - B

Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum

14%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

2F
4702.47
43.17
361.00
72.20
127.52

5051.70
687.79
5739.50

5306.37
722.46
6028.85

BLD-CSTN-5-7 (45)
Brick Masonary 2nd Class Modular Bricks 19 x 9 x 9 cms 2nd class in Cement Mortor 1:4 Prop including Cost
Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like m
charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:4)

45

1F
4702.47
43.17
255.04
51.01

A. MATERIALS:

Cement
Modular Bricks 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)

75.60 Kg
520 Nos
0.21 Cum
Sub Total of - A

B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.24 day.
0.56 day.
1.89 day.
Sub Total of - B

Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total

14%

1F
4558.97
43.17
255.04
51.01

2F
4558.97
43.17
361.00
72.20
127.52

4908.20

5162.87

Overheads & Contractors Profit @ 0.13615


Rate per One Cum

668.25
5576.45

702.92
5865.80

BLD-CSTN-5-8 (46)
Brick Masonary 2nd Class Modular Bricks 19 x 9 x 9 cms 2nd class in Cement Mortor 1:5 Prop including Cost
Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like m
charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:4)

46

Cement
Modular Bricks 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)

60.48 Kg
520 Nos
0.21 Cum
Sub Total of - A

B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)

0.24 day.
0.56 day.
1.89 day.
Sub Total of - B

Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum

14%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component @
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50% on labour component for each upper floor on First
Floor Rate (7.32 M) shall be allowed

1F
4472.19
43.17
255.04
51.01

2F
4472.19
43.17
361.00
72.20
127.52

Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

4821.42
656.44
5477.90

5076.09
691.11
5767.20

BLD-CSTN-5-9-(47)
Brick Masonary 2nd Class Modular Bricks 19 x 9 x 9 cms 2nd class in Cement Mortor 1:6 Prop including Cost
Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like m
charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:6)

47

A. MATERIALS:

A. MATERIALS:

Cement
Modular Bricks 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total

50.40 Kg
520 Nos
0.21 Cum
0.24 day.
0.56 day.
1.89 day.
14%

1F
4414.33
43.17
255.04
51.01

2F
4414.33
43.17
361.00
72.20
127.52

4763.56

5018.23

Overheads & Contractors Profit @ 0.13615


Rate per One Cum

648.56
5412.15

683.23
5701.50

BLD-CSTN-5-10-(48)
Brick Masonary 2nd Class Modular Bricks 19 x 9 x 9 cms 2nd class in Cement Mortor 1:8 Prop including Cost
Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like m
charges , curing charges etc., complete for finished item of work
Ground moulded size 23x11x7 Cm - (1:8)

48

Cement
Modular Bricks 19 x 9 x 9 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

37.80 Kg
520 Nos
0.21 Cum
0.24 day.
0.56 day.
1.89 day.
14%

1F
4342.00
43.17
255.04
51.01
0.00

2F
4342.00
43.17
361.00
72.20
127.52

4691.23
638.71
5329.95

4945.90
673.38
5619.30

BLD-CSTN-5-11 (49)
11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional
seigniorage charges, labour and all operations for constructing half brick masonry, mixing cement mortar, curing
excluding conveyance charges of materials.

11.5 cm wide Brick masonry - (1:3)

49

A. MATERIALS:

A. MATERIALS:

Bricks traditional size 23 x 11 x 7 cms 2nd class


Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Add Water charges@ 1%
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per 10 Sqm

565 Nos
106.00 Kg
0.22 Cum
0.60 day.
0.60 day.
2.75 day.
1%
14%

1F
5066.56
99.30
586.60
117.32

2F
5066.56
99.30
830.30
166.06
293.30

5869.78
799.17
6668.95

6455.52
878.92
7334.45

BLD-CSTN-5-12 (50)
Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd bricks having a crushing strength of not less
bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and
materials and water from approved sources to work site and all operational, incidental, labour charges such
masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished

11.5 cm wide Brick masonry - (1:6)

50

51

A. MATERIALS:

Bricks traditional size 23 x 11 x 7 cms 2nd class


Cement mortar (1 :6 )
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Add Water charges@ 1%
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm

512 Nos
0.20 Cum
0.60 day.
0.60 day.
2.75 day.
1%
14%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%

1F
4506.06
99.30
586.60
117.32
0.00

2F
4506.06
99.30
830.30
166.06
293.30

Total
Overheads & Contractors Profit @ 0.13615
Rate per 10 Sqm

5309.28
722.86
6032.15

5895.02
802.61
6697.65

BLD-CSTN-5-13-(51)
Exposed brick masonry for super structure on ground floor in cm (1:6) using wire cut bricks or moulded bric
grooves 10mm Wide 12mm deep, cost of all materials, seigniorage charges, labour and all operations, mixin
finished item of work, but excluding conveyance charges of materials
A. MATERIALS:

Modular Bricks 19 x 9 x 9 cms 2nd class


Cement
Fine aggregate (Sand)
Add Water charges@ 1%
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.13615

520 Nos
48.00 Kg
0.20 Cum
1%
0.57 day.
0.57 day.
2.54 day.
14%

1F
4813.05
43.20
255.00
51.00

2F
4813.05
43.20
361.00
72.20
127.50

5162.25
702.84

5416.95
737.52

Rate per One Cum


5865.10
Note : Compressive strength of individual Brick shall not be less than 70 kg / cm2

6154.50

52

BLD-CSTN-5-14-(52)
Brickwork in arches in cement mortar 1:4 complete including centering and shuttering excluding pointing an
specifications Clauses 606 and 1205.1 MORD
A. MATERIALS:

Modular Bricks 19 x 9 x 9 cms 2nd class


Cement mortar (1 :4 )
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
c) Add for centering and shuttering @ 110% of (a+b)

525 Nos
0.24 Cum
2.00 day.
1.88 day.
110%

c.Overheads & Contractors Profit


Grand Total
Rate per One Cum

14%

Rate for other Floors


1F
2F
Basic rate per 1Cum
11231.30
11231.30
For Material lift Charges & Labour rate for scaffolding above 7.32 M 0.00
127.50
increase @ 50%
Total
11231.30
11358.80
Overheads & Contractors Profit @ 0.13615
1529.14
1546.50
Rate per One Cum
12760.45
12905.30
Note : 1 ) In case cement mortar 1:3 is used, proportionate rate is to be adopted.
2) Quantity of bricks for arches will be about 10 per cent more than that for ordinary brickwork .
3) In case special arch bricks are used, the quantity of bricks per cum shall be taken as 580 Nos.
4) Rates for spandrel walls shall be taken same as for brickwork in substructure.
5) Rate for spandrel filling will depend on the filling material adopted
53

BLD-CSTN-5-15-(53)
Honey Comb work with Bricks of traditional Size and Plastered One Coat 10 mm. thick Cement Mortar 1:5 inclu
of all materials, seigniorage charges, labour and all operations,etc., complete for finished item of work,
A. MATERIALS:

Brick 2nd class 23 x 11 x 7


Cement mortar (1:5)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
White washing Two coats
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

750 Nos
0.67 Cum
2.41 day.
6.21 day.
6.60 day.

14%

1F

2F

11950.16

11950.16

43.20

43.20

255.00

361.00

51.00

72.20
127.50

12299.36

12554.06

1674.56

1709.24

13973.95

14263.30

54

BLD-CSTN-5-16-(54)
Honey Comb work with Bricks of Modular Size and Plastered One Coat 10 mm. thick Cement Mortar 1:5 includi
all materials, seigniorage charges, labour and all operations,etc., complete for finished item of work,
A. MATERIALS:

Brick 2nd class 19 x 9 x 9


Cement mortar (1:5)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
White washing Two coats
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

2.41 day.
6.21 day.
6.60 day.

14%

1F

2F

12651.84

12651.84

43.20

43.20

255.00

361.00

51.00

72.20
127.50

13001.04

13255.74

1770.09

1804.77

14771.15

15060.55

BLD-CSTN-5-17-(55)
Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing o
cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour ch
curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

Flyash blocks - 290 x 225 x 140 mm - (1:8)

55

790 Nos
0.67 Cum

A. MATERIALS:

Flyash Blocks size 29 x 22.5 x 14 cms


Cost of Cement Mortar ( 1:6 )
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

99 Nos
0.10 Cum
0.42 day.
0.92 day.
2.80 day.
14%

1F
2F
4312.51
4312.51
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Flyash blocks - 290 x 150 x 140 mm - (1:6)

55

Flyash blocks - 290 x 100 x 140 mm - (1:6)

55

BLD-CSTN-5-17-(55): Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x 140
using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance
charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for S
A. MATERIALS:

Flyash Blocks size 29 x 20 x 14 cms


Cost of Cement Mortar ( 1:6 )
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.13615
Rate per One Cum

111 Nos
0.10 Cum
0.42 day.
0.92 day.
2.80 day.
14%

1F
4045.51
49.65
293.30
58.66

2F
4045.51
49.65
415.15
83.03
146.65

4447.12
605.48
5052.60

4739.99
645.35
5385.35

BLD-CSTN-5-17-(55) ; Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/100
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and co
seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm fo

A. MATERIALS:

Flyash Blocks size 29 x 11 x 14 cms


Cost of Cement Mortar ( 1:6 )
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Add extra over Labour component @
Rate per One Cum

222 Nos
0.10 Cum
0.42 day.
0.92 day.
2.80 day.
14%

1F
4378.51
99.30
586.60
117.32

2F
4378.51
99.30
830.30
166.06
293.30

5181.73
705.49
5887.25

5767.47
785.24
6552.75

6
56

STONE MASONRY, DAMP PROOF COURSE, DRY STONE PACKING, QUARRY RUBBISH & GRAVEL BACK

BLD-CSTN-6-1(56)
Construction of Cut stone Masonary in Cement Mortor ( 1 : 2 ) Prop using hard granite stone including cost
Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting St
Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Cut Stone Roughly dressed to shape at quarry
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Woman mazdoor
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per One Cum

57

1.05 day
2.45 day
3.50 day
2.80 day
14%

BLD-CSTN-6-2-(57)
Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:2 ) Prop using hard granite stone including cost
Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting St
Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per One Cum

58

115.20 Kg
0.89 Cum
0.16 Cum
0.16 Cum

201.60 Kg
0.94 Cum
0.16 Cum
0.28 Cum
2.50 day
2.32 day
14%

BLD-CSTN-6-3-(58)
Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:3 ) Prop using hard granite stone including cost
Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting St
Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per One Cum

134.40 Kg
0.94 Cum
0.16 Cum
0.28 Cum
2.50 day
2.32 day
14%

59

BLD-CSTN-6-4-(59)
Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:4 ) Prop using hard granite stone including cost
Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting St
Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per One Cum

60

2.50 day
2.32 day
14%

BLD-CSTN-6-5-(60)
Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost
Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting St
Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per One Cum

61

100.80 Kg
0.94 Cum
0.16 Cum
0.28 Cum

67.20 Kg
0.94 Cum
0.16 Cum
0.28 Cum
2.50 day
2.32 day
14%

BLD-CSTN-6-6-(61)
Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone includin
Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for
mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per One Cum

76.80 Kg
0.94 Cum
0.16 Cum
0.32 Cum
1.50 day
2.32 day
14%

62

BLD-CSTN-6-12-(67)
Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conve
Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to r
Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

A. MATERIALS:
Cement
79.20 Kg
Coursed Rubble Stone
0.44 Cum
Rough Stone
0.50 Cum
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
0.16 Cum
Fine aggregate (Sand)
0.33 Cum
B. LABOUR:
Mason 1st class
1.20 day
Mazdoor (unskilled)
2.00 day
Total A+B
C.Overheads & Contractors Profit
14%
Grand Total
Rate per One Cum
Note : 1) In case cement mortar 1:3 is used, proportionate rate is to be adopted.
2) The addition for centering and sluttering at (c) above is for arch above 6 m span. For lesser span len
span above 4 m length and 50 per cent for spans less than 4 m.
1

BLD-CSTN-6-13-(68)
Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conve
Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting Stones to r
Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Rough Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per One Cum

59.40 Kg
0.44 Cum
0.50 Cum
0.16 Cum
0.33 Cum
1.20 day
2.00 day
14%

POINTING AND PLASTERING


BLD-CSTN-7-1-(72)
Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for including cost & convey
charges on all materials, labour charges on all materials, curing etc., Complete for finished item of work
A. MATERIALS:
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm

0.50 day
0.74 day
14%

BLD-CSTN-7-3-(74)
Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for including cost & convey
charges on all materials, labour charges on all materials, curing etc., Complete for finished item of work
A. MATERIALS:
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm

14.40 Kg
0.03 Cum

28.80 Kg
0.06 Cum
0.50 day
0.74 day
14%

BLD-CSTN-8-1-(76)
Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all m
materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting gro
for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Labour Charges for Scaffolding
Rate per 10 Sqm

0.15 Cum
0.60 day
0.96 day
14%

1F
1231.12
9.90
58.70
11.74

2F
1231.12
9.90
83.00
16.60
29.35

1311.46
178.56
1490.05

1369.97
186.52
1556.50

BLD-CSTN-8-2-(77)
Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all m
materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting gro
for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Labour Charges for Scaffolding
Rate per 10 Sqm

0.60 day
0.96 day
14%

1F
1127.80
9.90
58.70
11.74

2F
1127.80
9.90
83.00
16.60
29.35

1208.14
164.49
1372.65

1266.65
172.45
1439.10

BLD-CSTN-8-4-(79)
Plastering with 12mm thick in single coat in CM (1:6) finished smooth including cost and conveyance of all m
materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting gro
for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:6)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Labour Charges for Scaffolding
Rate per 10 Sqm

0.15 Cum

0.15 Cum
0.60 day
0.96 day
14%

1F
1024.48
9.90
58.70
11.74

2F
1024.48
9.90
83.00
16.60
29.35

1104.82
150.42
1255.25

1163.33
158.39
1321.75

BLD-CSTN-8-6-(81)
Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all m
materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting gro
for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)

0.19 Cum

B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Labour Charges for Scaffolding
Rate per 10 Sqm

0.60 day
0.96 day
14%

1F
1249.60
9.90
58.70
11.74

2F
1249.60
9.90
83.00
16.60
29.35

1329.94
181.07
1511.05

1388.45
189.04
1577.50

BLD-CSTN-8-7-(82)
Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all m
materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting gro
for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Labour Charges for Scaffolding
Rate per 10 Sqm

0.21 Cum
0.94 day
1.60 day
14%

1F
1727.63
9.90
58.70
11.74

2F
1727.63
9.90
83.00
16.60
29.35

1807.97
246.16
2054.15

1866.48
254.12
2120.60

BLD-CSTN-8-9-(84)
Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M.
cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, i
mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., com
surfaces of walls. (External walls)

Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
Cement
Fine aggregate (Sand)
Top Coat in CM(1:4), 4 mm thick
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Labour Charges for Scaffolding
Rate per 10 Sqm

43.00 Kg
0.18 Cum
14.50 Kg
0.04 Cum
0.63 day
1.47 day
3.90 day
14%

1F
2980.90
9.90
58.70
11.74

2F
2980.90
9.90
83.00
16.60
29.35

3061.24
416.79
3478.05

3119.75
424.75
3544.50

10 BLD-CSTN-8-10 - (85)
Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (
cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, i
mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete

Unit = 10 sqm
A. MATERIALS:
Base Coat in CM (1:5), 8 mm thick
Cement
Fine aggregate (Sand)
Top Coat in CM (1:4), 4 mm thick
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm

31.70 Kg
0.11 Cum
14.50 Kg
0.04 Cum
0.63 day
1.47 day
3.90 day
14%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Labour Charges for Scaffolding
Rate per 10 Sqm

1F
2860.60
9.90
58.70
11.74

2F
2860.60
9.90
58.70
11.74
29.35

2940.94
400.41
3341.35

2970.29
404.40
3374.70

11 BLD-CSTN-8-11-(86)
RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed
finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & other taxes on all m
conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc
excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903)

Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh - BMT-F.27
Cement Mortar 1:3 for 25 mm thick
Dry Cement for making Lumps
12 mm plastering 2 coats in 1:4 & 1:2 cm both sides
Excluding HYSD Steel/ Mild steel & Binding wire
B) LABOUR CHARGES
1st Class Mason
Miller Operator
Mazdoor (unskilled)
c) Machinery
Machine Mixing Mortar with Miller - Hire charges
Total
over heads & contractors profit
Grand Total
Rate per 10 sqm

13.30 sqm
0.25 cum
50.00 kg
21.80 sqm

8.00 day
1.00 day
10.00 day
2.00 Hrs
14%

Rate per 10 Sqm

FLOORING, DADOING, CLADING & SKIRTING

12 BLD-CSTN-9-1-(99)
Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs) set over base coat o
Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with ne
materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour
complete for finished item of work, but excluding the cost of conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Polished Shahabad/ Tandur stone slabs of 15 to 18 mm thick
(0.457x0457)
Cement for CM (1:8) proportion for base coat
Cement for slurry
Cement for jointing
Sand for CM (1:8) proportion
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Add water charges 1%
Grand Total
over heads & contractors profit
Total cost for 10 sqm
Rate per 10 Sqm

11.00 sqm
21.60 kg.
33.00 kg.
20.00 kg.
0.12 cum
3.10 day
1.10 day
0.86 day

14%

13 BLD-CSTN-9-2-(100)
Flooring with 40 mm thick Rough Cuddapah/Shabad stones, set over base coat of cement mortar (1 : 8) 12 mm
slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flo
complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finis
conveyance of all materials.

A. MATERIALS:
Shahabad / Tandur Rough Stone slabs of minimum 40 mm thick
Cement for CM (1:8) proportion for base coat
Cement for CM 1:3 proportion for pointing
Sand for CM (1:8) proportion
Sand for CM (1:3) proportion
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total
over heads & contractors profit
Total cost for 10 sqm

10.50 Sqm
21.60 Kg
9.60 Kg
0.12 Cum
0.02 Cum
0.960 day
2.240 day
3.30 day
14%

Rate per 10 Sqm

14 BLD-CSTN-9-3-(101): Flooring with polished marble slab 20 mm thick set over base coat of cement morta
flushed) over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spr
cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab
including seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stones etc., comp
the cost of conveyance of all materials.
A. MATERIALS:
Polished Marble slabs of any variety(Such as Dongari/ Adanga/ Marodh/
Rajganpur etc) 16 mm to 20 mm (average) thick ( 0.610 M width of any
length
Cement for CM (1:6) proportion for base coat
Cement for slurry for bedding
White Cement for pointing
Sand for CM (1:6)
B. MACHINARY
Machine for rubbing of floor- BMC-X.01
C. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total
over heads & contractors profit
Total cost for 10 sqm

10.50 Sqm

48.00 Kg
33.00 Kg
5.00 Cum
0.20 Cum
1.00 day
2.10 day
3.00 day
5.00 day
14%
Rate per 10 Sqm

15 BLD-CSTN-9-4-(102):
Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar
or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed
pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, in
finished item of work, but excluding the cost of conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 22 mm thick (medium shade)
Cement for CM (1:6) proportion for base coat
Cement for slurry
Cement for jointing & pointing
Pigment
Sand for CM (1:6) proportion
B. MACHINERY
Nill
C. LABOUR
Mason 2nd class
Man mazdoor
Mazdoor (unskiled)

10.50 sqm
28.80 kg.
33.00 kg.
6.00 kg.
0.00 kg.
0.12 cum

0.960 day
2.240 day
3.30 day

Add water charges 1%


Total
over heads & contractors profit
Total cost for 10 sqm

1.00%
14%
Rate per 10 Sqm

16 BLD-CSTN-9-5-(103)
Flooring with vitrified tiles 1st quality of size -900x900, set over base coat of cement mortar (1:8), 12 mm
slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with w
pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, inclu
finished item of work, but excluding the cost of conveyance of all materials.

Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size -900x900x10mm
Cement for CM (1:8) for base coat
Cement for slurry
Cement for Pointing with CM (1:3)
Sand for CM (1:8)
Sand for pointing
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
Total cost for 10 sqm

10.50
21.60
33.00
6.000
0.12
0.020

sqm
kg.
kg.
kg.
cum
cum

0.96
2.24
3.30

day
day
day

1.00%
14%
Rate per 10 Sqm

17 BLD-CSTN-9-6-(104)
Flooring with ceramic tiles (Non skid type), set over base coat of cement mortar (1:8), 12 mm thick over CC
neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seign
item of work, but excluding the cost of conveyance of all materials. (For Toilets)

Unit = 10 sqm
A. MATERIALS:

Ceramic tiles
Cement for CM (1:8) for base coat
Cement for slurry
White cement
Sand for CM (1:8)
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
Total cost for 10 sqm

10.50 sqm
21.60 kg.
33.00 kg.
2.00 kg.
0.12 cum
0.96 Nos
2.24 Nos
3.30 Nos
1.00%
14%
Rate per 10 Sqm

18 BLD-CSTN-9-7-(105)
Flooring with high polished granite 16 to 18 mm mm thick slabs other than black set over base coat of cem
already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sq
mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water an
charges, labour charges for dressing of tilesetc., complete for finished item of work, but excluding the cost of con

Unit = 10 sqm
A. MATERIALS:

High polished granite 16 to 18 mm thick slab other than black

10.50 sqm

Cement for CM (1:8) for base coat


Cement for slurry
White cement for jointing & pointing
Cement for jointing
Sand for CM (1:8)
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
Total cost for 10 sqm

36.00 kg.
33.00 kg.
6.00 kg.
kg.
0.20 cum
3.00 day
1.00 day
8.00 day
1.00%
14%
Rate per 10 Sqm

19 BLD-CSTN-9-8-(106)
Flooring with marble tiles polished 8 mm thick set over base coat of cement mortar (1:8), 12 mm thick o
including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white ce
shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including seig
item of work, but excluding the cost of conveyance of all materials

A. MATERIALS:
Marble tiles polished 8 mm thick
Cement for CM (1:8) for base coat
Cement for slurry
White cement for jointing & pointing
Sand for CM (1:8)
B. LABOUR (including for polishing & rubbing)
Mason 1st class
Mazdoor (unskiled)
Add water charges 1%
Total
over heads & contractors profit
Total cost for 10 sqm

10.50 Sqm
36.00 Kg
33.00 Kg
5.00 Cum
0.20 Cum
4.00 day
8.00 day
1.00%
14%
Rate per 10 Sqm

20 BLD-CSTN-9-9-(107)
Flooring
with granite stone tiles 8 mm thick (mirror polished of all shades) set over base coat of cement mo
A. MATERIALS:
Granite stone tiles 8 mm thick (mirror polished of all shades)
10.50 Sqm
Cement for CM (1:6) for base coat
Sand for CM (1:6)
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Total
over heads & contractors profit
Total cost for 10 sqm

48.00 Kg
0.20 Cum
0.96 day
2.24 day
3.30 day
1.00%
14%
Rate per 10 Sqm

21 BLD-CSTN-9-10-(108)
Flooring
with decorated white back ground glazed tiles, set over base coat of cement mortar (1:6), 12 mm
A. MATERIALS:
Decorated white back ground glazed tiles - BMT-C.03
10.50 Sqm
Cement for CM (1:6) for base coat
28.80 Kg
Cement for slurry
33.00 Kg

White cement for jointing & pointing


Sand for CM (1:6)
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Total
over heads & contractors profit
Total cost for 10 sqm

6.00 Kg
0.12 Cum
0.96 day
2.24 day
3.30 day
1.00%
14%
Rate per 10 Sqm

22 BLD-CSTN-9-13-(111)
Gronolithie
Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine cru
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed)
0.17 Cum
Cement
120.00 Kg
Sand
0.085 Cum
B. LABOUR:
Mason 1st class
1.25 day
Mason 2nd class
0.06 day
Mazdoor (unskiled)
3.00 day
Add water charges 1%
Total
over heads & contractors profit
Total cost for 10 sqm
Rate per 10 Sqm

1.00%
14%

23 BLD-CSTN-9-15-(113):
Flooring
Unit = 10with
sqmCement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over with 12 mm thick
A. MATERIALS:
Cement Concrete 1:6:10 using concrete mixer
1.00 cum
Plastering with CM (1:3), 12 mm thick
10.00 sqm
B. LABOUR
Mason 1st class
0.15 day
nd
Mason 2 class
0.35 day
Mazdoor (unskiled)
5.40 day
Add water charges 1%
1.00%
Total
over heads & contractors profit
14%
Total cost for 10 sqm
Rate per 10 Sqm

24 BLD-CSTN-9-18-(116)
Providing
Unit = 10 skirting
sqm to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal t
A. MATERIALS:
Ceramic tiles 7.30 mm thick
10.50 sqm
Sand for cm 1:3 base coat
0.12 cum
Cement for cm 1:3 base coat
57.60 kgs
Cement for slurry
33.00 kgs
White cement for jointing & pointing
6.00 kgs
B. LABOUR
Mason 1st class
0.77 Nos
Mazdoor (unskiled)
0.80 Nos
Grand Total
over heads & contractors profit
14%
Total cost for 10 sqm
Rate per 10 Sqm

25 BLD-CSTN-9-19-(117):
Providing
Unit = 10 skirting
sqm to internal walls to 15 cm height/risers of steps with marble slab 16 to 20.mm thickness, length
A. MATERIALS:
Marble slab 16 to 20mm thickness, BMT-B.13
10.50 sqm
Sand for base coat
0.12 cum
Cement for base coat
57.60 kg
Cement for slurry
33.00 kg
White cement for jointing & pointing
5.00 kg
Flate nosing charges
66.67 RM
Machine cutting charges
67.67 RM
B. LABOUR
Mason Ist class
2.10 day
Man mazdoor (Beldar)
4.90 day
Man mazdoor (Beldar) for polishing & rubbing
4.00 day
Woman mazdoor
4.00 day
Grand Total
over heads & contractors profit
14%
Total cost for 10 sqm
Rate per 10 Sqm

26 BLD-CSTN-9-20 - (118) ::
Providing
skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring ston
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles polished 1st quality
10.50 sqm
Sand for cm 1:5 base coat
0.12 cum
Cement for cm 1:5 base coat
34.56 kgs
Cement for slurry
33.00 kgs
White cement for jointing & pointing
2.00 kgs
B. LABOUR
Mason Ist class
0.96 day
Mason 2nd class
2.24 day
Mazdoor (unskilled)
3.30 day
Add water charges 1%
1.00%
Grand Total
over heads & contractors profit
14%
Total cost for 10 sqm
Rate per 10 Sqm

27 BLD-CSTN-9-21 - (119) :
Providing skirting to internal walls to 15 cm height/risers of steps with 8 mm thick mirror polished granite tiles le
coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm
with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water et
etc., complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
8 mm thick mirror polished granite tiles
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskilled)
Add water charges 1%
Grand Total
over heads & contractors profit
Total cost for 10 sqm
Rate per 10 Sqm

10.50 sqm
0.12 cum
57.60 kgs
33.00 kgs
5.00 kgs
2.10 day
0.80 day
4.90 day
1.00%
14%

28 BLD-CSTN-9-23-(121)
Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm thick polished Shahabad sto
base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs p
mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, ceme
seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materia

Unit = 10 sqm
A. MATERIALS:
15 to 18 mm thick polished Shahabad stone (White)
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
Total cost for 10 sqm
Rate per 10 Sqm

11.00 sqm
0.12 cum
57.60 kgs
33.00 kgs
0.96 Nos
2.24 Nos
3.10 Nos
1.00%
14%

29 BLD-CSTN-9-18-(116)
Dadooing to walls with Glazed colour tiles of any size 1st quality set over a base coat of CM(1:3) Prop. 12mm
like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cem
shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all ope
as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets
A. MATERIALS:
Colour glazed tiles of 1st quality
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing
B. LABOUR
Mason Ist class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
Total cost for 10 sqm
Rate per 10 Sqm

10.50 Sqm
0.12
cum
57.60
kgs
33.00
kgs
6.00
kgs
0.77
0.80
1.00%

day
day

14%

WATER PROOFING AND PAINTING

30 BLD-CSTN-10-25-(148)
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof c
when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials
labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of w
of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3
Water proof compound
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)

0.210 Cum
2.000 Kg
0.660 day
1.540 day
3.70 day

Total
over heads & contractors profit
Total cost for 10 sqm
Rate per 10 Sqm

14%

31 BLD-CSTN-10-3-(126)
Roofing
with corrugated
G.I sheets 1.25mm thick fixed with G.I J bolts & nuts 8 mm dia with bitumen & G.I limp
Unit = 184.518
sqm
A. MATERIALS:
Plain or Corrugated Galvanized iron sheets as per IS 277 (0.1 mm to 0.8
154.80 kgs
mm thickness) - (BMT-E.20)
G.I scam bolts & nuts 2 x 27 (laps) x 17 = 884(BMS-W.62) Sl No.937 Pg
47.91 nos
No.73
G.I J bolts 8 mm dia 2 x 5 x 27 sheets x 3 nos = 810 nos.(BMS-W.64)
43.90 nos
Sl No.939 Pg No.73
Limpet washers (for scam & J bolts)
884 + 810 = 1694 (BMS91.82 nos
W.66) Sl No.941 Pg No.74
Bitumen washers (BMS-W.67) Sl No.942 Pg No.74
91.82 nos
Zinc cromate yellow paint (BMT-J.04) Sl No-356 Pg 23
0.14 litre
Ready mixed paint (BMT-J.28) Sl.No.380
B. LABOUR
For roofing
Carpenter II class
Man mazdoor (beldar)
For premier painting one coat
Painter
Mazdoor (coolie)
For two coats of painting to over laps
Painter
Mazdor (coolie)
Total
over heads & contractors profit
Grand Total
Rate per 10 sqm = Grand Total/10

0.20 litre

0.84 day
0.91 day
0.06 day
0.06 day
0.14 day
0.14 day
14%

Rate per 10 Sqm

32 BLD-CSTN-10-4-(127)
Roofing
with 6sqm
mm thick corrugated asbestos cement sheets, fixing with G.I J bolts & nuts 8 mm dia G.I pla
Unit = 216.14
A. MATERIALS:
6 mm thick corrugated AC sheets - BMT-E.17, Sl No.123 -Pg 16
11.30
Sqm
8 mm dia G.I J bolts & nuts -BMS-W.62-Pg 73
G.I washers- BMS-W.65 - Sl No-925,Pg 73
Bitumen washers - BMS-W.67 - Pg 73
B. LABOUR
Carpenter II class
Man mazdoor
Sundries including 50 x 6 mm iron wind ties white lead etc.

22.03
22.03
22.03

nos
nos
nos

0.43
0.54

day
day
LS

Add for Standard specification 1mm. Thick ridging and 1.25 mm thick
sheet vallyes when such are required for a particular work. Average
allowance for 10 sqm roofing.
Grand Total
over heads & contractors profit
Grand Total
Rate per 10 sqm = Grand Total/10

LS

14%

Rate per 1 Sqm

33 BLD-CSTN-12-2-(169)
Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior Gr-2 after thorou

Cement Primer Grade - II


1st class painter
2nd class painter
Sundries including brushes, ladders, etc.,
over heads & contractors profit
Total cost
Rate per 10 Sqm

1.00 Kg
0.21 day
0.49 day
0.50%
14%

34 BLD-CSTN-11-4- (161)
White
one coat with whiting of approved quality to give an even shade after
brushing the sur
Whitingwashing
/ White Cement
1.20thoroughly
Kg
Gum, conjee water, or prickly pear juice including necessary fire wood
LS
Brick Layers / Painter
Mazdoor (unskilled)
Sundries including brushes, ladders, etc.,
over heads & contractors profit
Total cost
Rate per 10 Sqm

0.11 day
0.22 day
0.50%
14%

35 BLD-CSTN-11-5-(162)
White
coats with whiting of approved quality to give an even shade2.00
after
Whitingwashing
/ White two
Cement
Kgthoroughly brushing the
Gum, conjee water, or prickly pear juice including necessary fire wood LS
Brick Layers / Painter
Mazdoor (unskilled)
Sundries including brushes, ladders, etc.,
over heads & contractors profit
Total cost
Rate per 10 Sqm

0.21 day
0.32 day
1%
14%

36 BLD-CSTN-12-3-(170)
Painting
Wallswash
with one
Snowcem
Cost of white
coat or other equal and approved Water Proof Cement Paint over Priming Coat, One
Cost of Snowcem paint
2.00 Kg
1st class painter
0.09 day
2nd class painter
0.21 day
Mazdoor (unskilled)
1.50 day
Add sundries including brushes etc @
1%
over heads & contractors profit
Total cost
Rate per 10 Sqm

14%

37 BLD-CSTN-12-4-(171)
Painting
Wallswash
with one
Snowcem
Cost of white
coat or other equal and approved Water Proof Cement Paint over Priming Coat, Two
Cost of Snowcem paint
3.50 Kg
1st class painter
0.15 day
2nd class painter
0.35 day
Mazdoor (unskilled)
1.50 day
Add sundries including brushes etc @
1%
over heads & contractors profit
Total cost
Rate per 10 Sqm

14%

38 BLD-CSTN-12-5-(172)
Painting
to new Primer
walls with 2 coats of water proof cement paint of apporved brand1.00
andKg
shade over a base coat
Cost of Cement
Ist class painter
0.21 day
2nd class painter
0.49 day
Cost of water proof cement Paint of approved quality
3.50 Kg
1st class painter
0.15 day
2nd class painter
0.35 day
Mazdoor (unskilled)
1.50 day
over heads & contractors profit
Total cost
Rate per 10 Sqm

14%

39 BLD-CSTN-11-10-(167)
Painting
toCOAT:
new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade
PRIMARY
Cost of Oil bound Distemper Primer
0.50 Kg
Painter I st class
0.08 day
Pianter II nd class
0.19 day
Cost of washable Oil Bound Distemper
1.70 Kg
1st class painter
0.36 day
II class painter
0.84 day
Grand Total
over heads & contractors profit
14%
Total cost for 10 sqm
Rate per 10 Sqm

40 BLD-CSTN-12-12-(193)
Painting
Synthetic
paints
- One
Coat
- forPaints
New Wood
Work
Syntheticwith
Enamel
paint Enamel
(at 20 sqm
/ litre
as per
British
(I) Ltd.Work, Old Wood
0.70
Ltr & New Iron Work inc
1st Class Painter
2nd Class Painter
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
Total cost for 10 sqm
Rate per 10 Sqm

0.21 day.
0.49 day.

14%

DOORS , WINDOWS AND VENTILATORS

41 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together throug
the
bySSR
end-locks,
mounted
on -BMT-F.29
specially designed pipe shaft of 50mm dia
nominal
Rateends
as per
Item No.
156,Pg 18
1.00
Sqm bore MS B class p
over heads & contractors profit
14%
Rate per 1 Sqm
42 BMT-P.25
NCL or shutter
Equivalent
ECOwith
3000
SERIES
WINDOWS
(SUITABLE
FORx RESIDENTIAL
BUILDINGS
WITHsize
GR
a Double
Window
vertical
member
40 x 40
(1219.2mm
1219.2mm) outer
frame section
47x20mm
and
mullion
section
be of 48x50mm.
Rate as per
SSR
Item No.
742should
Pg 62 -BMT-P.25
1 Sqm
over heads & contractors profit
14%
Total
Rate per 1 Sqm
b Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section size o
47x20mm.
section
of 48x50mm.
Fixed beading section size of 12x12mm.1 Sqm
Rate as perMullion
SSR Item
No. size
743 Pg
62 -BMT-P.26
over heads & contractors profit
14%
Total
Rate per 1 Sqm

43 NCL or Equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH GRILL &
of windows
pre-painted
(Base
Steel 50x40
as per IS (1524mm
513 of 0.6mm
thick galvanized
as persection
IS 277 size
with zo
Centre
fixedmade
both of
side
openablesteel
shutter
window
x1219.2mm).
Outer frame
47x20mm.
Mullion
section
size
of
72x50mm.
Fixed
beading
section
size
of
12x12mm.
Rate as per SSR Item No. 748, Pg 63 -BMT-P.31
1 Sqm
over heads & contractors profit
14%
Total
Rate per 1 Sqm

44 NCL or Equivalent Sliding Windows Providing and Fixing Sliding Window fabricated from Roll formed s
coated/powder
coated
(Base
Steel
as -BMT-P.33
per IS 513 D quality, galvanized as per IS 277
with zinc of 120 GM/Sq.
Rate as per SSR
Item No.
750,
Pg 63
1 Sqm
over heads & contractors profit
14%
Total
Rate per 1 Sqm

45 BMT-N.04
Providing
and
fixing
thick
RAJSHRI
or Equivalent BRAND FACTORY MADE
SOLID SINGLE SIDE
Rate as per
SSR
Item30mm
No.646,
Pg 43
-BMT-N.04
1 Sqm
over heads & contractors profit
14%
Total
Rate per 1 Sqm

46 BMT-N.31
Doors
(Colour
CoatedPg
Steel
Board as per IS 14276
Rate asFrames
per SSR
Item No.673,
48 Sections)
-BMT-N.31& Shutter using Cement Bonded Particle
1 Sqm
over heads & contractors profit
14%
Total
Rate per 1 Sqm

47 BMT-F.30
Supplying
& SSR
fixingItem
collapsible
steel
shutters
with vertical, double channel of 20 x10x21mm
Rate as per
No. 157,
Pg 18
-BMT-F.30
Sqmof 100 mm centre ,Bra
over heads & contractors profit
14%
Total
Rate per 1 Sqm

48 BMT-N.31
Doors
Frames
Board as per IS 14276
item No.673
of (Colour
Pg.48 Coated Steel Sections) & Shutter using Cement Bonded Particle
1 Sqm
over heads & contractors profit
14%
Total
Rate per 1 Sqm

49 BMT-P.44
Ventilators
Top hung
x 2-0
(1219.2
x 609.6mm) outer frame section size of 461 xSqm
52 m shutter frame sect
Rate as per: SSR
Item 4-0
No. 761
Pg 65
-BMT-P.44
over heads & contractors profit
14%
Total
Rate per 1 Sqm

50 BMS-W.16
Supply,
delivery
and Cement
fixing of 50mm
thick
Cement
JaliPg
of 84
size- BMS-W.17
0.90x0.45 m for Ventilator
including all labour charg
Cost of 50
mm thick
Jali -SSR
Item
No.892,
1 Sqm
over heads & contractors profit
Total
Rate per 1 Sqm

14%

51 Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars
vertically at 30cm centre to centre including fixing with 4 Nos
MS
Z holdfasts 1.50
(2 onx each side) duly making
ForofMS
Grill
Quantity Anailysis
Cost of 25mm x 6mm MS flat alround
2 ( 1.5+ 1.5 )
6.00 Rmt @ 1.20 kg/Rmt
Cost of 10mm M.S square bars @0.78 kg /Rmt
Vertical bars
5 5 x 1.5
Horizontal bars
10 10 x 1.25

Cost Analysis
Cost of 10mm MS squre bars
Cost of 25X 6mm MS Flat
Labour charges for fabricating steel and fixing in position as per SSR
Item No.BMM-V.14-824 & BMM-V.15-825.Pg- 68

17.55 Kgs
7.20 Kgs
24.75 Kgs

Rate per 1.56 Sqm


Rate per 1 Sqm

52 Supply and fixing of 40 mm thick polished black Kadapa stone for platform including labourcharges for lifting and
Kadapa slab 40 mm thick and size not less than 0.457 M x 0.457 M
1.05 Sqm
(BMT-B.01) item 22 Pg 11
Rounding the edges of Kadapa / Shahabad stone slabs of any thickness
1.34 Rmt
including polishing the same (BMM-V.09) item 860 Pg 82 (0.75 Mts wide
plot farm)
Labour charges for lifting & fixing in position @

20%

over heads & contractors profit


Grand Total
Rate per 1 sqm

14%

Rate per 10 Sqm

53 BLD-CSTN-15-5-(307)
Providing
and for
fixing
1.80 metre
long
MS
posts
with 6 mm bar nibs as per design in plate No. 22/2
Details of cost
10 pipes
12.5 cm
long
dayfencing
i.e., 1.25
metres
Materials:
Galvanised mild steel tube (light grade) 40 mm nominal bore 10 x 12.5
cm = 1.25 metre with wastage of 5% (BMW-F.75)
Labour :For cutting and fixing in position
Assistant fitter
Mason.
Mazdoor (male).
Sundries
Add for water charges @ 1 %
Cost for 1.25 m
over heads & contractors profit
Cost for 1.25 m
Cost per m

1.310 m

0.100 day
0.400 day
0.400 day

14%

Rate per 10 Sqm

54 BLD-CSTN-10-34-(157)
Providing
and fixing Thermocole False ceiling in true horizontal level 600 mm x 600 mm using 15 mm/ 19 mm t
UNIT 1 sqm
A) Material requirement
19 mm Thermocole sheet 600 x 600 (Sl No.582-BMT-M.38-Pg 34)
1.00 sqm
Alumninium Angle 24 mm x 24 mm (559-BMT-M.15-Pg 33 )

0.40 RM

Anodised Aluminium T Section (1) 24 x 24.5 x 2.4 mm mm 560-BMTM.16-Pg 29 )


GI Rod - prestraightened - 2.0 mm dia Connecting Rod (571 -BMTM.27-Pg 30)
Rawl Plugs (561-BMT-M.18-Pg 29)
B) LABOUR CHARGES
1st Class Carpenter
2nd Class Carpenter
1st Class Painter
2nd Class Painter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery

3.20 RM
1.28 Nos
1.28 Nos
0.36 day
0.36 day
0.00 day
0.00 day
0.02 day
0.04 day
0.20 day

Power Saw Cutter - Hand Operated - Hire charges ( 945-BMC-X.02-Pg


74)
Power Drill - Hand Operated - Hire Charges (946 -BMC-X.03-Pg 74)

Scaffolding charges
BASIC COST per 1 sqm
over heads & contractors profit
Grand Total
Rate per 1 sqm

0.16 Hrs
0.32 Hrs

1%
14%

55 BLD-CSTN-10-33-(156)
Providing
and fixing in true horizontal level 600 mm x 600 mm 15 mm thick Arm strong false ceiling syste
UNIT 1 sqm
A) Material requirement
15 mm - Armstrong Mineral Fiber sheet 600 x 600, BMT-M.29 ,Sl No1.00
sqm
573, Pg No 30
Hot dipped GI Angle - Precoated - Grid -19 mm x 19 mm -BMT-M.11, Sl
0.40
RM
No 554, Pg 29
Polyster painted GI - T Section - 1200 mm - (1) 24 x 32 mm and (2) 24 x
1.60
RM
25 mm (sub-cross Tee) - BMT-M.12
Polyster painted GI - T Section - 300 mm-BMT-M.14 - 24 mm x 27 mm

1.60

RM

GI Rod - prestraightened - 2.0 mm dia


Connecting Rod - BMT-M.27,Sl No 570, Pg No 30
6 mm Nylon Rawl Plug -BMT-M.19-Sl No 562, Pg No 29

1.28
1.28

RM
Nos

0.40
0.40
0.08
0.08
0.04
0.04
0.24

day
day
day
day
day
day
day

0.32
0.32

Hrs
Hrs

B) LABOUR CHARGES
PER UNIT 1 sqm
1st Class Carpenter
2nd Class Carpenter
1st Class Painter
2nd Class Painter
Power Saw Cutter - Hand Operated - Operator
Power Drill - Hand Operated - Operator
Unskilled Mazdoor
C) Machinery
Power Saw Cutter - Hand Operated - Hire charges
Power Drill - Hand Operated - Hire Charges
Scaffolding charges
BASIC COST per 1 sqm
over heads & contractors profit
Grand Total
Rate per 1 sqm

1%
14%

56 Observed dataSupply,
fabrication
and
in position
MS Purlines
cost and conveyance
of all material and all labo
Weight of
40mm dia
MSfixing
Structural
Pipre-ofMedium
classincluding
as per IS-1161
1 Rmt
add 5% for wastage
Total weight
Cost of Mild Steel Tubes & pipes of all diameters as per IS-1161-BMTF.04-Sl No-130 and Pg 17
outer dia of 40mm dia MS pipe = 48.3mm
Painting with Synthetic enamil paint (2Pi rl)
Labour charges for fixing @ 30%
Rate per 1 Rmt

3.74 Kg
r
2
6.290 0.024
0.15 Sqm

57 Observed data based on IRR-CCDW1-8 :


and fixing 2.50 m long cold twisted deformed steel Anchor rods with 1.50m
length
a Providing
Unit - 10 Nos
25 mm
dia driven in to the ho
A) MATERIALS
25mm dia Steel (including 5% Wastage) 10 Nos of 2.50m length
101.00 Kg
Drilling of 36mm dia holes by Pneumatic Compressor Sl No.143 Pg No.
19 of R&B SSR
Grouting 36mm dia holes with neat cement slurry Sl No.146 Pg No. 19

B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Total
over heads & contractors profit
Grand Total
Rate per 10 sqm

10 Nos
10 Nos

0.50 day
0.50 day
1.00 day
14%

Rate per Each

Unit - 10 Nos
A) MATERIALS
20mm dia Steel (including 5% Wastage) 10 Nos of 2.50m length
Drilling of 25mm dia holes by Pneumatic Compressor Sl No.142 Pg No.
19
Grouting 25mm dia holes with neat cement slurry Sl No.145 Pg No. 19

B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Total
over heads & contractors profit
Grand Total
Rate per 10 sqm

20 mm dia
65.00 Kg
10 Nos
10 Nos

0.50 day
0.50 day
1.00 day
14%

Rate per Each

Unit - 10 Nos
A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 2.50m length
Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141 Pg No.
19
Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg No. 19
B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Total
over heads & contractors profit
Grand Total
Rate per 10 sqm

16 mm dia
41.50 Kg
10 Nos
10 Nos

0.50 day
0.50 day
1.00 day
14%

Rate per Each

58 BLD-CSTN-15-7(307)
Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres
standard, rails, straining bolts, including securing with and provision of galvanised mild steel wire, stapples or s
of wood, concrete, steel, etc.) and straining bolts shall be paid for separately).

Details of Cost per 100 metres (day line of wire)


Materials:
Galvanised steel barbed wire IS type I weighing 9.38 Kg/100 metre -M063, Pg-245
Carriage of barbed wire.
G.I. staples steel pins or binding wire @10%
Labour :For fixing & stretching wire
Blacksmith, 1st Class
Blacksmith, 2nd Class
Mazdoor (male).
Sundries.
Add water charges @ 1 %

9.380 Rmt

0.150 No
0.150 No
0.300 No

over heads & contractors profit


Cost for 100 metres day line of wire
Rate per m

Rate per 1Rmt

Observed Data

59 Fixing MS angular sections of 1.20 m length of size 50mm x 50mm x 6mm confirming to IS 226 and IS 80
including
in position
concrete for the purpose of fixing barbed wire fencing
weight of placing
MS angular
sectioninofthe
50x50x6mm
4.50 Kgand painting the angles
Labour charges for fabricating steel and fixing in position as per SSR
4.50 Kg
Item No.BMM-V.14-824 & BMM-V.15-825.Pg- 68
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position
Add two coats synthetic anamel painting charges
Area for 1 No., of MS angle of 1.05m length for both sides
Size of angle 50x50x6mm
Area = 1.05 x 0.112 =
Say
Total cost for each angular including fixing

4.50 Kg

0.1176 Sqmt
0.12 Sqmt

60 BMM-V.16:
Labour
fabricating
heavy
steel works like Trusses, Stanchions, Heavy1Beams
and Girders includi
Rate ascharges
per itemfor
No.867
of Pg all
No.62
-2011-12
Kg
Add Labour component @
20%
over heads & contractors profit
Total
Rate per 1 Kg

14%

61 BMM-V.17:
Labour
fixingofheavy
iron -2010-11
grills, Trusses, Stanchions, Heavy Beams and1 Kg
Girders erecting in positio
Rate as charges
per item for
No.868
Pg No.62
Add Labour component @
20%
over heads & contractors profit
Total
Rate per 1 Kg

14%

60 Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour
etc,.
Cost Complete.
of Mild Steel, structural steel, i.e. Angles,channels and "I" sections
1 Kg
Transportation of material for 20.00Km lead

1 Kg

Labour charges for fabrication


Labour charges for fixing
over heads & contractors profit
Rate per 1 Kg

1 Kg
1 Kg
14%

60 Manufacture, Supply , Delivary and fixing of MS Door frame made with T angle of size 40x40x6 mm with
with
3 nos.
125 6'-9"
mm Butt hings welded to the frame and 6 Nos. MS Z hold fasts
with 20x5 mm
Door size
3'-0"x
0.90
2.05MS Flat 200
T angle for Door frame @ 3.5 Kg/Rmt
5.90 Rmt @
6 nos.MS hold fasts with 20x5 mm Flat
1.38 Rmt @
weight of 10 sq mm tie rods 2 Nos
1.80 Rmt @
Cost of T angle & 10 mm Sq. rod for Door Frame
cost of 3 Nos. 125 mm long butt hinges( Sl No.185)
Labour charges for farication works
Labour charges for fixing works
Sundries

23.13
3
23.13
23.13

61 Supply and fixing of 30 mm thick Flush Door shutter solid bond wood block board type with commercia
Aldrop,
2 nos.
lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch 1 No. do
Door size
: 3'-125
0" Xmm
6-9"
Shutter size for the T angle door frame
0.90
2.05
cost of flush door shutter 30 mm thick (SSR No.658) - BMT-N.16

1.845

Sqmt

Aldrop of 300 mm long (BSSR.Sl. No.202) - BMT-G.45

1.00

No.

Door handle of 125 mm long (BSSR Sl. No.192) - BMT-G.35

2.00

No.

Tower bolt of 150 mm long (BSSR Sl.No.172) -BMT-G.15

1.00

No.

Door latch of 250 mm long (BSSR Sl No.208) - BMT-G.51

1.00

No.

1.845

Sqmt

Labour charges for door shutter

62 Supply and fixing of Steel Glazed Window with double openable on both sides centrally fixed post and
clips with other fittings and their fixtures including supplying and fixing of 10 mm
H square bars
V @ 10cm c
a MS Window Section - E Z 7
1.20
1.20
for Outer Frame:
Horizantals
2 Nos
1.20
verticals
2 Nos
1.20
holdfasts
4 Nos
0.20
Inner frame for shutters:
Horizantals
verticals

4 Nos
4 Nos

0.60
1.20
Total

c
d
e

FRB section
for central (Mullion) MS Tee 30 x 30 x 3
10 sq. mm saftety rods @ 100mm C/C
4 mm thick Pin headed Glass

1 Nos
12 Nos
1.20

1.20
1.20
1.20

Weight of " Z " Angles -T1 =1.03 Kgs/m (steel India )

12.80 Rmt

MS Tee for Central Mullian -235x25x3 @ 1.15 Kg/Rmt

1.20 Rmt

10 sq. mm saftety rods @ 0.78 Kg/Rmt

14.40 Rmt

a
b

ABSTRACT
cost of Mild steel and structural steel
10mm Sq. Bars

14.60 Kg
11.20 Kg

window shutter lock handle with hinges 100mm (192) - BMT-G.35

Cost of 4 mm thick Pin headed Glass - BMT-I.13- (SSR No.344)

e
f

Labour charges for fixing of glass & cost of putty


Labour charges for fabricating steel works like Windows excluding cost
of fixing in position
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position

2 No.
1.44 1.44
1.44 sqmt
25.80 Kg
25.80 Kg

63 Supply & Fixing of MS "L" Angle 25X25X3 mm door frames (W.C.) with 2 Nos. of 125mm long hinges an
bonded
boards
to IS 14276 truly exterior grade (Bison panel
"L" Angleparticle
WC Door
Sizeconfirming
.
0.75or equivalent
2.05 ) including cost a
5.60
"L" Angle for Door frame .
1.38 1.20 Rmt@
6 nos.MS hold fasts with 20x5 mm Flat
0.92
"L" Angle for Hold fast 4 Nos of 0.23m
7.90
Rmt
7.90
Rmt
Weight of 'L' for Door Frame @1.10Kg/ Rmt
8.69
Kg
Cost of 'L' Angle Door Frame with hold fasts
8.69
Kg
Labour charges for Fabrication Works (140)
8.69
Kg
Labour charges for Fixing (141)
Shutter Size 2'-6" X 6'-0"
Cost of plain cement bonded particle boards confirming to IS 14276 truly
1.5375
Sqm
exterior grade (Bison Panel or equivalent) SSR No. 491 - BMT-K.88
Cost of 2 Nos. Hinges 125 mm long (186) - BMT-G.29
Tower bolt of 150 mm long (BSSR Sl.No.172) -BMT-G.15
Labour Charges for fixing Door including cost of screws and
transportation etc.

2.00

Nos

2.00

Nos

1.54

Sqm

64 BMW-G.01
Providing
on Terrace
(at all floor
levels) polyethylene water storage tank1.00
withLit
Double layer approved b
Basic rate&asPlacing
per S.No.335
of Pg.No.99
- BMW-G.01
BMW-G.02-labour charges @
40%
Total
Overheads & Contractors Profit
Total
Rate per 1 Lit

65 BLD-CSTN-11-8-(164)
Colour
twowashing
coats with
Colour and quality to give an even shade after thoroughly brushing th
Rate aswashing
per White
Twoapproved
coats
Add 50% extra for colour etc
50%
over heads & contractors profit
Total cost

14%

Rate per 10 Sqm

66 Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equ
2.00mm MS sheet at bottom 0.30m height and 12mm MS square
Vertically at
125mm
centre to centre inclu
For MSbars
Gate
1.75
x
Quantity Anailysis
45 x 45 x 6mm MS equal angle alround @ 4.00 Kg/Rmt
Vertical Angle (1.50+2.0)
Horizontal Angle
Z Holdfasts

2 Nos
2 Nos
4 Nos

1.75
1.50
0.45

9.00 Rmt
2 Nos
1.50

35x35x5mm MS equal Horizontal Angle@2.60Kg/Rmt

3.00 Rmt
Total Angles Qty
B

12mm M.S square bars @ 1.13 kg /Rmt


Vertical bars

Total Square Bars Qty


MS Sheet of 2.00mm (14G) for Bottom portion @ 15.70 Kg/ 1 Sqm

12 Nos

1.75

21.00 Rmt
1.50

0.30

0.45 Sqm
Cost Analysis
Cost of Equal angles
Cost of 12mm MS squre bars
Cost of MS sheet
Labour charges for fabricating steel and fixing in position as per SSR
Item No.BMM-V.14-824
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position- BMM-V.15-825.Pg- 68
Painting with Synthetic enamil paint
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long
-BMT-G-18
MS-Powder Coated Aldrop (IS:2681) 300 mm long -BMT-G.45

43.80 Kgs
23.73 Kgs
7.07 Kgs
74.60 Kgs
74.60 Kgs

2.63 Sqm
1 No
1 No

Overheads & Contractors Profit

Rate per2.625 Sqm


Rate per 1 Sqm
Rate per 74.595 Kg
Rate per 1 Kg
67 Hallow Brick Masonry 6" in superstructure with CM (1:6) prop: . including c/c of all materials like cement,
seigniorage charges, & other taxes on all materials, all operational, incidental and labour charges such as m
scaffolding charges, lift charges, curing, etc., complete for finished item of work Size of Hallow Birck (16"X8"X6")
Hallow blocks
Cement Mortar (1:6)
1st Class Mason
2nd Class Mason
Man Mazdoor
Basic Rate per Cum.
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum

76 Nos
0.15 cu.m.
0.60 Nos.
0.60 Nos.
2.75 Nos.
14%

Rate for other Floors

1F

2F

Basic rate per 1Cum


Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%

2912.84
66.20
391.07
78.21

2912.84
66.20
553.53
110.71
195.53

Total
Overheads & Contractors Profit @ 0.14
Rate per One Cum

3448.32
469.49
3917.85

3838.81
522.65
4361.50

68 Hallow Brick Masonry 4" thick for partition walls in CM (1:6) prop: and placing 2nos. of 6mm dia MS bars
of reinforcement keyed into mortar joints of the main brick work whereever applicable including c/c of all mater
site, seigniorage charges, & other taxes on all materials, all operational, incidental and labour charges su
masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabric
work Size of Hallow Birck (16"X8"X4"). (APSS No. 501 & 504).
Hallow blocks
Cement Mortar (1:6)
1st Class Mason
2nd Class Mason
Man Mazdoor
sundries
Basic Rate per Cum.
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.14
Basic Rate per Cum.

113
0.13
0.60
0.60
2.75

Nos
cu.m.
Nos.
Nos.
Nos.

14%

1F
2866.97
99.30
586.60
117.32

2F
2866.97
99.30
830.30
166.06
293.30

3670.19
499.70
4169.90

4255.93
579.44
4835.40

Rate

5.740
858.93
384.00

Per

Amount

1 Kg
1 Cum
1 Nos

8265.60
901.88
76.80
Rs

5.740
858.93
384.00

1 Kg
1 Cum
1 Nos

5510.40
901.88
76.80
Rs

5.740
858.93
384.00

1 Kg
1 Cum
1 Nos

1 Kg
1 Cum
1 Nos

1 Kg
1 Cum
1 Nos

1 Kg
1 Cum
1 Nos

1 Kg
1 Cum
1 Nos

2631.80

1377.60
901.88
76.80
Rs

5.740
858.93
384.00

3045.08

1653.12
901.88
76.80
Rs

5.740
858.93
384.00

3733.88

2066.40
901.88
76.80
Rs

5.740
858.93
384.00

5111.48

2755.20
901.88
76.80
Rs

5.740
858.93
384.00

6489.08

4132.80
901.88
76.80
Rs

5.740
858.93
384.00

9244.28

1 Kg
1 Cum
1 Nos

2356.28

1033.20
901.88
76.80
Rs

2011.88

all lifts and with an initial lead of 10m including all operational,
finished item of work including seigniorage excluding dewatering

Cum
450.00
320.00

1 day
1 day.

Rs

0.00
1164.80
232.96
1397.76
873.60
2271.36
309.25
2580.61
258.06
258.10

all lifts and with an initial lead of 10m including all operational,
finished item of work including seigniorage excluding dewatering
pth
Cum
450.00
384.00
2791.00

1 day.
1 day.

0.00
3194.88

1 hours

Rs

16746.00
19940.88
2714.95
22655.83
94.4
94.40

all lifts and with an initial lead of 10m including all operational,
finished item of work including seigniorage excluding dewatering
6m depth
Cum

450.00
384.00
2791.00

1 day.
1 day.

0.00
3194.88

1 hours

Rs

16746.00
19940.88
2714.95
22655.83
107.88
107.90

all lifts and with an initial lead of 10m including all operational,
finished item of work including seigniorage excluding dewatering
eans-Upto 3 m depth
Cum

320.00

1 day.
1 day.

Rs

0.00
1664.00
332.80
1996.80
1248.00
3244.80
441.78
3686.58
368.66
368.70

r all lifts and with an initial lead of 10m including all operational,
finished item of work including seigniorage excluding dewatering
Cum

450.00
384.00
2791.00

1 day.
1 day.

0.00
2396.16

1 hours

Rs

16746.00
19142.16
2606.21
21748.37
120.82
120.85

r all lifts and with an initial lead of 10m including all operational,
finished item of work including seigniorage excluding dewatering
Cum
450.00
576.00
576.00
384.00
1145.10
73.00
13.00

1 day.
1 day.
1 day.
1 day.

0.00
288.00
144.00
3206.40

1 hours

1145.10

1 Kg
100 Nos.

255.50
1.82

Rs

5040.82
686.31
5727.13
572.71
572.75

r all lifts and with an initial lead of 10m including all operational,
finished item of work including seigniorage excluding dewatering
Cum
450.00
384.00

1 day
1 day

0.00
1996.80

1145.10

1 hour

6870.60

8867.40
1207.3
10074.70
1007.47
1007.50

with initial lead in layers not exceeding 15 cm thick, consolidating


to work site and all operational, incidental, labour charges, hire

Cum
641.93

1 Cum

3851.58

450.00
384.00

1 day
1 day

0.00
119.04
3970.62
540.6
4511.22
751.87
751.90

with initial lead in layers not exceeding 15 cm thick, consolidating


to work site and all operational, incidental, labour charges, hire

Cum
306.76

1 Cum

1840.56

450.00
384.00

1 day
1 day

0.00
119.04
1959.60
266.8
2226.40
371.07
371.10

ches, sides of foundations and basement with initial lead in layers


ng including cost and conveyance of water to work site and all
m of work. (APSS NO. 309 & 310)
Cum
450.00

1 day

0.00

384.00

1 day

119.04
16.21
135.25
22.54
22.55

using 20mm size Hard Granite Machine Crushed Metal including


site , seigniorage charges on all materials, labour charges , for

5.74
2009.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

2296.00
1808.83
356.37
123.60

504.00
384.00

1 day
1 day

50.40
906.24
5541.44
754.47
6295.91
6295.95

Rs

Rs

Grade M10 Nominal Mix upto Plinth level using 40mm size Hard
t, sand, coarse aggregate water etc., to site , seigniorage charges
finishing top surface to the required level curing etc., complete for

5.74
1489.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1262.80
1340.83
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
4006.36
545.47
4551.83
4551.85

Rs

Rs

2.5:5 using 40mm, 20mm & 10mm size Hard Granite Machine
ggregate water etc., to site , seigniorage charges on all materials,
hed item of work.

5.74
1489.81
791.93
1579.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Cum
1 Cum
1 Kl

1578.50
804.50
213.82
142.18
380.13
123.60

504.00
384.00

1 day
1 day

50.40
906.24

Rs

Rs

4199.37
571.74
4771.11
4771.15

x (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using


materials like cement, sand, coarse aggregate water etc., to site ,
mming in 15 cm layers, finishing top surface to the required level

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

929.88
1340.83
356.37
123.60

504.00
384.00

1 day
1 day

50.40
906.24
3707.32
504.75
4212.07
4212.10

Rs

Rs

ment concrete nominal mix (1:4:8) prop (Cement : fine aggregate:


cost and conveyance of all materials like cement, sand, coarse
mixing , laying, concrete , ramming in 15 cm layers, finishing top
nd under flooring bed.

5.74
1489.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

929.88
1340.83
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
3673.44
500.14
4173.58
4173.60

Rs

Rs

l mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate )


f all materials like cement, sand, coarse aggregate water etc., to
e , ramming in 15 cm layers, finishing top surface to the required

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1340.83
427.64
123.60

504.00
384.00

1 day
1 day

50.40
906.24
3592.61
489.13

Rs

Rs

4081.74
4081.75

ent concrete nominal mix (1:5:10) prop (Cement : fine aggregate:


cost and conveyance of all materials like cement, sand, coarse
mixing , laying, concrete , ramming in 15 cm layers, finishing top
nd under flooring bed.

5.74
1489.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

743.90
1340.83
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
3487.46
474.82
3962.28
3962.30

Rs

Rs

l mix (1:6:10) prop (Cement : fine aggregate: coarse aggregate )


f all materials like cement, sand, coarse aggregate water etc., to
e , ramming in 15 cm layers, finishing top surface to the required

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

619.92
1340.83
427.64
123.60

504.00
384.00

1 day
1 day

50.40
906.24
3468.63
472.25
3940.88
3940.90

Rs

Rs

ent concrete nominal mix (1:6:10) prop (Cement : fine aggregate:


cost and conveyance of all materials like cement, sand, coarse
mixing , laying, concrete , ramming in 15 cm layers, finishing top
nd under flooring bed.

5.74
1489.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

619.92
1340.83
427.64
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
3434.75

Rs

Rs

467.64
3902.39
3902.40

(1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using


materials like cement, sand, coarse aggregate water etc., to site ,
mming in 15 cm layers, finishing top surface to the required level

5.74
1489.81
791.93
103.00

1 Kg
1 Cum
1 Cum
1 Kl

1262.80
1340.83
356.37
123.60

504.00
384.00

1 day
1 day

50.40
906.24
4040.24
550.08
4590.32
4590.32

Rs

Rs

ement : fine aggregate: coarse aggregate ) using 20mm size Hard


e cement, sand, coarse aggregate water etc., to site , seigniorage
ete for finished item of work with nomonal reinforcement

5.74
1854.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1669.33
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
4966.26
676.16
5642.42
5642.42

Rs

Rs

Mix 1:2.5:5 (Cement : fine aggregate: coarse aggregate ) using


of all materials like cement, sand, coarse aggregate water etc., to
e , ramming in 15 cm layers, finishing top surface to the required

5.74
1854.81
791.93
103.00
338.60

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1894.20
1669.33
356.37
123.60
338.60

504.00
384.00

1 day
1 day

50.40
533.76
4966.26
0
4966.26
4966.26

Rs

Rs

gate: coarse aggregate) corresponding to Table 9 of IS 456 using


oved quarry including cost and conveyance of all materials like
orage charges, sales & other taxes on all materials including all
ring etc.,complete but excluding cost of steel and its fabrication
LINTH, PEDESTALS

1854.81
791.93
5.74
504.00
450.00
384.00
338.60
175.40
103.00

6528.88
277.00
446.00

6528.88
315.00
710.00

6528.88
1335.00
1075.00

1 Cum
1 Cum
1 Kg
1 day.
1 day.
1 day.
1 hour
1 hour
1 Kl
Rs

1669.33
356.37
2296.00
67.03
120.15
1382.40
338.60
175.40
123.60
6528.88

Rs

6528.88
277.00
446.00
89.20
7341.08
999.49
8340.57
8340.57

Rs

6528.88
315.00
710.00
142.00
7695.88
1047.79
8743.67
8743.67

Rs

6528.88
1335.00
1075.00
215.00
9153.88
1246.3
10400.18
10400.18

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

SCAFFOLDING

1854.81
791.93
5.74

1 cum
1 cum
1 Kgs

1669.33
356.37
2296.00
4321.70

504.00
450.00
384.00

1 day
1 day
1 day

84.17
75.15
1804.80
1964.12

338.60
175.40
103.00

1 hour
1 hour
1 kl

338.60
175.40
123.60
637.60
6923.42
942.62
7866.04
7866.04

Rs

6923.42
341.00

1 Cum
1 Cum

6923.42
341.00

1603.00

1 Cum

1603.00
320.60
9188.02
1250.95
10438.97

Rs
Rs
3F
6923.42
#REF!
#REF!
#REF!
#VALUE!

4F
6923.42
#REF!
#REF!
#VALUE!

5F
6923.42
#REF!
#REF!
#REF!
#VALUE!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

589.236

#REF!
#REF!
#REF!

6923.42
#REF!

1 Cum
1 Cum
1 Cum

6923.42

Rs

Rs
3F
6923.42

4F
6923.42

5F
6923.42

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

589.236

#REF!
#REF!
#REF!

0.20 m Thick
6923.42
#REF!

1 Cum
1 Sqm
1 Sqm

6923.42

Rs

Rs
3F
6923.42
#REF!
#REF!
#REF!
#REF!

4F
6923.42
#REF!
#REF!
#REF!

5F
6923.42
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

589.236

#REF!
#REF!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!

#REF!

#REF!

0.20 m Thick
6923.42
#REF!

1 Cum
1 Sqm
1 Sqm

6923.42

Rs

Rs

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

1854.81
791.93
5.74

1 cum
1 cum
1 Kgs

1669.33
356.37
2296.00
4321.70

504.00
450.00
384.00

1 day
1 day
1 day

33.77
59.85
960.00
1053.62

338.60
175.40
103.00

1 hour
1 hour
1 kl

90.41
46.83
123.60
260.84
5636.16
767.36
6403.52
6403.55

Rs

5636.16
#REF!

1 Cum
1 Cum
1 Cum

5636.16

Rs

Rs
3F
5636.16
#REF!
#REF!
#REF!
#REF!

4F
5636.16
#REF!
#REF!
#REF!

5F
5636.16
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

316.09

#REF!
#REF!
#REF!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Thick
5636.16
#REF!

0.12 m
1 Cum
1 Sqm
1 Sqm

5636.16

Rs

Rs
3F
5636.16
#REF!
#REF!
#REF!
#REF!

4F
5636.16
#REF!
#REF!
#REF!

5F
5636.16
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

316.09

#REF!
#REF!
#REF!
Thick
5636.16

0.13 m
1 Cum
1 Sqm
1 Sqm

5636.16

Rs

Rs
3F
5636.16
#VALUE!
#REF!
#REF!
#REF!

4F
5636.16
#REF!
#REF!
#REF!

5F
5636.16
#VALUE!
#REF!
#REF!
#REF!

#REF!

#REF!

316.09

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!
#VALUE!
#VALUE!

#REF!
#REF!
#REF!

#VALUE!
#VALUE!
#VALUE!

Thick
5636.16
156.00
124.00

0.175 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5636.16
890.76
#REF!
#REF!
#REF!

4F
5636.16
890.76
#REF!
#REF!
#REF!

5F
5636.16
890.76
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

5636.16
890.76
708.04
141.61
7376.57
1004.32
8380.89
8380.90

316.09

#REF!
#REF!
#REF!
Thick
5636.16
164.00
130.00

0.325 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5636.16
505.12
#REF!
#REF!
#REF!

4F
5636.16
505.12
#REF!
#REF!
#REF!

5F
5636.16
505.12
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

316.09

#REF!
#REF!

5636.16
505.12
400.40
80.08
6621.76
901.55
7523.31
7523.35

#REF!

#REF!

#REF!

5636.16
1342.00
1064.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
5636.16
1342.00
#REF!
#REF!
#REF!

4F
5636.16
1342.00
#REF!
#REF!
#REF!

5F
5636.16
1342.00
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

5636.16
1342.00
1064.00
212.80
8254.96
1123.91
9378.87
9378.90

316.09

#REF!
#REF!
#REF!

5636.16
#REF!

1 Cum
1 Sqm
1 Sqm

352.26

Rs

Rs
3F
352.26
#REF!
#REF!
#REF!
#REF!

316.09

4F
352.26
#REF!
#REF!
#REF!

5F
352.26
#REF!
#REF!
#REF!
#REF!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

5636.16
#REF!

1 Cum
1 Sqm
1 Sqm

352.26

Rs

Rs

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

GH BATCHER / MIXER with 20mm size graded machine crushed


ance of all materials like cement, fine aggregate (sand) coarse
l materials including all operational, incidental and labour charges
ding cost of steel and its fabrication charges for finished item of
LINTH, PEDESTALS

1854.81
791.93
5.74
504.00
450.00
384.00
338.60
175.40
103.00

6571.96
277.00
446.00

6571.96
315.00
710.00

6571.96
1335.00
1075.00

1 Cum
1 Cum
1 Kg
1 day.
1 day.
1 day.
1 hour
1 hour
1 Kl
Rs

1483.85
316.77
2009.00
67.03
120.15
1766.40
451.35
233.81
123.60
6571.96

Rs

6571.96
277.00
446.00
89.20
7384.16
1005.35
8389.51
8389.55

Rs

6571.96
315.00
710.00
142.00
7738.96
1053.66
8792.62
8792.65

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

6571.96
1335.00
1075.00
215.00

Rs

9196.96
1252.17
10449.13
10449.15

GH BATCHER / MIXER with 20mm size graded machine crushed


ance of all materials like cement, fine aggregate (sand) coarse
l materials including all operational, incidental and labour charges
ding cost of steel and its fabrication charges for finished item of
LS, WATER TANKS, RCC WALLS IN BUILDINGS

1854.81
791.93
5.74

1 cum
1 cum
1 Kgs

1483.85
316.77
2009.00
3809.62

504.00
450.00
384.00

1 day
1 day
1 day

84.17
75.15
2150.40
2309.72

338.60
175.40
103.00

1 hour
1 hour
1 kl

451.35
233.81
123.60
808.76
6928.10
943.26
7871.36
7871.40

Rs

6928.10
341.00

1 Cum
1 Cum

6928.10
341.00

1603.00

1 Cum

1603.00
320.60
9192.70
1251.59
10444.29

Rs
Rs
3F
6928.10
341.00
1924.00
384.80
320.60

4F
6928.10
341.00
2084.00
416.80
480.90

5F
6928.10
341.00
2244.00
448.80
641.20

922.97
11173.77
1521.31

999.88
11602.98
1579.75

692.92

10591.42
1442.02

12033.45

12695.10

13182.75

6928.10
615.00

1 Cum
1 Cum

6928.10
615.00

2537.00

1 Cum

2537.00
507.40
10587.50
1441.49
12029.00

Rs
Rs
3F
10587.50
#REF!
#REF!
#REF!
#VALUE!

4F
10587.50
#REF!
#REF!
#VALUE!

5F
10587.50
#REF!
#REF!
#REF!
#VALUE!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

6928.10
1133.00
1141.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
6928.10
1133.00
1369.00
273.80
228.80
692.92

10625.62
1446.68
12072.30

4F
6928.10
1133.00
1483.00
296.60
343.20

5F
6928.10
1133.00
1597.00
319.40
457.60

922.97
11106.87
1512.20
12619.10

999.88
11434.98
1556.87
12991.90

6928.10
1133.00
1141.00
228.20
9430.30
1283.94
10714.24
10714.25

0.20 m Thick
6928.10
#REF!

1 Cum
1 Sqm
1 Sqm

6928.10

Rs

Rs
3F
6928.10
#REF!
#REF!
#REF!
#REF!

4F
6928.10
#REF!
#REF!
#REF!

5F
6928.10
#REF!
#REF!
#REF!
#REF!

922.97
#REF!
#REF!
#REF!

999.88
#REF!
#REF!
#REF!

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

692.92

#REF!
#REF!
#REF!

0.20 m Thick
6928.10
0.00
0.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

6928.10
0.00
0.00
0.00
6928.10
943.26
7871.36
7871.40

GH BATCHER / MIXER with 20mm size graded machine crushed


ance of all materials like cement, fine aggregate (sand) coarse
l materials including all operational, incidental and labour charges
ding cost of steel and its fabrication charges for finished item of
pliers approved by the department including pumping, centering,
its fabrication charges for finished item of work. for RCC SLABS,

1854.81
791.93
5.74

1 Cum
1 Cum
1 Cum

1483.85
316.77
2009.00
3809.62

504.00
450.00
384.00

1 Cum
1 Cum
1 Cum

33.77
59.85
1181.57
1275.19

338.60
175.40
103.00

1 Cum
1 hour
1 Cum

Rs

104.29
54.02
123.60
281.91
5366.72
730.68
6097.40
6097.40

5366.72
3681.00
2471.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
5366.72
3681.00
#REF!
#REF!
#REF!
382.56

#REF!
#REF!
#REF!

5366.72
#REF!

4F
5366.72
3681.00
#REF!
#REF!
#REF!

5F
5366.72
3681.00
#REF!
#REF!
#REF!

186.95
#REF!
#REF!
#REF!

202.53
#REF!
#REF!
#REF!

1 Cum
1 Cum
1 Cum

5366.72
3681.00
2471.00
494.20
12012.92
1635.56
13648.48
13648.50

5366.72

Rs

Rs

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Thick
5366.72
227.00
152.00

0.075
1 Cum
1 Sqm
1 Sqm

Rs

Rs
3F
5366.72
3025.91
2426.06
485.21
405.23
382.56

12091.69
1646.28
13738.00
Thick
5366.72
227.00
152.00

4F
5366.72
3025.91
2639.34
527.87
607.85

5F
5366.72
3025.91
2839.29
567.86
810.46

186.95
12354.63
1682.08
14036.75

202.53
12812.77
1744.46
14557.25
0.12 m

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5366.72
1974.90
1583.40
316.68
264.48
382.56

9888.74
1346.35
11235.10
Thick
5366.72

5366.72
3025.91
2026.16
405.23
10824.02
1473.69
12297.71
12297.75

4F
5366.72
1974.90
1722.60
344.52
396.72

5F
5366.72
1974.90
1853.10
370.62
528.96

186.95
9992.41
1360.47
11352.90

202.53
10296.83
1401.91
11698.75

5366.72
1974.90
1322.40
264.48
8928.50
1215.62
10144.12
10144.15

0.12 m
1 Cum

5366.72

227.00
152.00

1 Sqm
1 Sqm
Rs

Rs

1890.91
1266.16
253.23
8777.02
1194.99
9972.01
9972.05

3F
5366.72
1890.91
1516.06
303.21
253.23
382.56

9712.69
1322.38
11035.10
Thick
5366.72
227.00
152.00

4F
5366.72
1890.91
1649.34
329.87
379.85

5F
5366.72
1890.91
1774.29
354.86
506.46

186.95
9803.63
1334.76
11138.40

202.53
10095.77
1374.54
11470.35
0.14 m

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5366.72
1620.78
#REF!
#REF!
#REF!
382.56

#REF!
#REF!
#REF!
Thick
5366.72
227.00
152.00

4F
5366.72
1620.78
#REF!
#REF!
#REF!

5F
5366.72
1620.78
#REF!
#REF!
#REF!

186.95
#REF!
#REF!
#REF!

202.53
#REF!
#REF!
#REF!

5366.72
1620.78
1085.28
217.06
8289.84
1128.66
9418.50
9418.50

0.15 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs

5366.72
1514.09
1013.84
202.77
8097.42
1102.46
9199.88
9199.90

3F
5366.72
1514.09
1213.94
242.79
202.77
382.56

8922.87
1214.85
10137.75
Thick
5366.72
233.00
157.00

4F
5366.72
1514.09
1320.66
264.13
304.15

5F
5366.72
1514.09
1420.71
284.14
405.54

186.95
8956.70
1219.45
10176.20

202.53
9193.73
1251.73
10445.50
0.175 m

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5366.72
1330.43
#REF!
#REF!
#REF!
382.56

#REF!
#REF!
#REF!

4F
5366.72
1330.43
#REF!
#REF!
#REF!

5F
5366.72
1330.43
#REF!
#REF!
#REF!

186.95
#REF!
#REF!
#REF!

202.53
#REF!
#REF!
#REF!

5366.72
1330.43
896.47
179.29
7772.91
1058.28
8831.19
8831.20

Thick
5366.72
233.00
157.00

0.20 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5366.72
1165.00
#REF!
#REF!
#REF!
382.56

#REF!
#REF!
#REF!
Thick
5366.72
233.00
157.00

4F
5366.72
1165.00
#REF!
#REF!
#REF!

5F
5366.72
1165.00
#REF!
#REF!
#REF!

186.95
#REF!
#REF!
#REF!

202.53
#REF!
#REF!
#REF!
0.25 m

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5366.72
932.00
#REF!
#REF!
#REF!
382.56

#REF!
#REF!
#REF!
Thick
5366.72
244.00
164.00

5366.72
1165.00
785.00
157.00
7473.72
1017.55
8491.27
8491.30

4F
5366.72
932.00
#REF!
#REF!
#REF!

5F
5366.72
932.00
#REF!
#REF!
#REF!

186.95
#REF!
#REF!
#REF!

202.53
#REF!
#REF!
#REF!

5366.72
932.00
628.00
125.60
7052.32
960.17
8012.49
8012.50

0.325 m
1 Cum
1 Sqm
1 Sqm

5366.72
751.52
505.12

Rs

Rs

101.02
6724.38
915.52
7639.90
7639.90

3F
5366.72
751.52
#REF!
#REF!
#REF!
382.56

#REF!
#REF!
#REF!

Thick
5366.72
409.00
241.00

4F
5366.72
751.52
#REF!
#REF!
#REF!

5F
5366.72
751.52
#REF!
#REF!
#REF!

186.95
#REF!
#REF!
#REF!

202.53
#REF!
#REF!
#REF!

0.075 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick
5366.72
409.00
241.00

0.100 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick
5366.72
409.00
241.00

5366.72
4090.00
2410.00
482.00
12348.72
1681.28
14030.00
14030.00

0.120 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick
5366.72
409.00
241.00

5366.72
5451.97
3212.53
642.51
14673.73
1997.83
16671.56
16671.60

5366.72
3406.97
2007.53
401.51
11182.73
1522.53
12705.26
12705.30

0.125 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs

5366.72
3272.00
1928.00
385.60
10952.32
1491.16
12443.48
12443.50

Thick
5366.72
409.00
241.00

0.150 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs

5366.72
2728.03
1607.47
321.49
10023.71
1364.73
11388.44
11388.45

Thick
5366.72
421.00
248.00

0.175 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick
5366.72
421.00
248.00

0.300 m
1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick
5366.72
440.00
259.00

Rs

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
5366.72
2002.00
1613.00
322.60
268.80
382.56

9955.68
1355.47
11311.15

5366.72
1401.93
825.84
165.17
7759.66
1056.48
8816.14
8816.15

0.350 m
1 Cum
1 Sqm
1 Sqm
Rs

5366.72
2002.00
1344.00

5366.72
2403.91
1416.08
283.22
9469.93
1289.33
10759.26
10759.30

4F
5366.72
2002.00
1747.00
349.40
403.20

5F
5366.72
2002.00
1882.00
376.40
537.60

186.95
10055.27
1369.02
11424.30

202.53
10367.25
1411.50
11778.75

5366.72
1258.40
740.74
148.15
7514.01
1023.03
8537.04
8537.05

5366.72
2002.00
1344.00
268.80
8981.52
1222.83
10204.35
10204.35

5366.72
3607.00
2127.00

1 Cum
1 Cum
1 Cum
Rs

Rs

5366.72
3607.00
2127.00
425.40
11526.12
1569.28
13095.40
13095.40

3F
5366.72
3607.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

5366.72
224.00
175.00

4F
5366.72
3607.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

5F
5366.72
3607.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
335.42
224.00
210.00
42.00
35.00
23.91

870.33
118.50
988.85

5366.72
#REF!

4F
335.42
224.00
228.00
45.60
52.50

5F
335.42
224.00
245.00
49.00
70.00

11.68
897.20
122.15
1019.35

12.66
936.08
127.45
1063.55

1 Cum
1 Sqm
1 Sqm

335.42
224.00
175.00
35.00
769.42
104.76
874.18
874.20

335.42

Rs

Rs

#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

lant at site with 20mm size graded machine crushed hard granite
erials like cement, fine aggregate (sand) coarse aggregate, water
ding all operational, incidental and labour charges such as weigh
el and its fabrication charges for finished item of work (APSS No.
the department including pumping, centering, shuttering, laying
n charges for finished item of work. FOUNDATIONS, PLINTH,

1854.81
791.93
5.74

1 Cum
1 Cum
1 Kg
1 Kg
1 Kl

1483.85
316.77
2009.00
0.00
#REF!

#REF!

1 hour
1 hour
1 hour

#REF!

504.00
450.00
384.00

1 day.
1 day.
1 day.

28.22
25.20
352.13
#REF!

#REF!

Rs

#REF!
277.00
446.00

#REF!
315.00
710.00

#REF!
1335.00
1075.00

1 Cum
1 Cum
1 Cum

Rs

#REF!
277.00
446.00
89.20
#REF!
#REF!
#REF!
#REF!

Rs

#REF!
315.00
710.00
142.00
#REF!
#REF!
#REF!
#REF!

Rs

#REF!
1335.00
1075.00
215.00
#REF!
#REF!
#REF!
#REF!

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

hing plant at site with 20mm size graded machine crushed hard
all materials like cement, fine aggregate (sand) coarse aggregate,
s including all operational, incidental and labour charges such as
st of steel and its fabrication charges for finished item of work
ATER TANKS, RCC WALLS IN BUILDINGS

1854.81
791.93
5.74
#REF!

1 cum
1 cum
1 Kgs
1 kl

1483.85
316.77
2009.00
3809.62

#REF!

1 hour
1 hour
1 hour

#REF!

#REF!
504.00
450.00
384.00

1 day
1 day
1 day

55.94
99.90
597.50
753.34
#REF!
#REF!
#REF!

Rs

#REF!

#REF!
341.00

1 Cum
1 Cum

#REF!
341.00

1603.00

1 Cum

1603.00
320.60
#REF!
#REF!
#REF!

Rs
Rs
3F
#REF!
#REF!
#REF!
#REF!
320.60
#REF!
#REF!
#REF!

#REF!
#REF!

4F
#REF!

5F
#REF!
#REF!
#REF!
#REF!
641.20
#REF!
#REF!
#REF!

#REF!
#REF!
480.90
#REF!
#REF!
#REF!

1 Cum
1 Cum

#REF!

1 Cum
Rs
Rs
3F
#REF!
#REF!
#REF!
#REF!
#VALUE!

#REF!
#REF!
#VALUE!

5F
#REF!
#REF!
#REF!
#REF!
#VALUE!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!

4F
#REF!

1 Cum
1 Cum
1 Cum

#VALUE!
#REF!
#REF!
#REF!

#REF!

Rs

Rs
3F
#REF!

4F
#REF!

5F
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

228.80
#REF!
#REF!
#REF!

343.20
#REF!
#REF!
#REF!

457.60
#REF!
#REF!
#REF!

0.20 m Thick
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs

#VALUE!
#REF!
#REF!
#REF!
#REF!

0.20 m Thick
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs

#VALUE!
#REF!
#REF!
#REF!
#REF!

hing plant at site with 20mm size graded machine crushed hard
all materials like cement, fine aggregate (sand) coarse aggregate,
s including all operational, incidental and labour charges such as
st of steel and its fabrication charges for finished item of work
roved by the department including pumping, centering, shuttering,
n charges for finished item of work. for RCC SLABS, BEAMS

1854.81
791.93
5.74

1 Cum
1 Cum
1 Cum
1 Cum

1483.85
316.77
2009.00
3809.62

#REF!

1 hour
1 hour
1 hour

#REF!

#REF!
504.00
450.00
384.00

1 Cum
1 Cum
1 Cum

Rs

33.77
59.85
1181.57
1275.19
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

1 Cum
1 Cum
1 Cum

#REF!

Rs

Rs
3F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

4F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1 Cum
1 Cum
1 Cum

#REF!

Rs

Rs

Thick

#VALUE!
#REF!
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

0.075 m
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#REF!
#REF!
#REF!
405.23
#REF!
#REF!
#REF!

4F
#REF!
#REF!
#REF!
607.85
#REF!
#REF!
#REF!

5F
#REF!
#REF!
#REF!
#REF!
810.46
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

Thick

0.10 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#VALUE!
#REF!
#REF!
264.48
#REF!
#REF!
#REF!

4F
#REF!
#REF!
#REF!
396.72
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#VALUE!
#REF!
#REF!
528.96
#REF!
#REF!
#REF!

Thick

0.12 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#VALUE!
#REF!
#REF!
253.23
#REF!
#REF!
#REF!

4F
#REF!
#REF!
#REF!
379.85
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#VALUE!
#REF!
#REF!
506.46
#REF!
#REF!
#REF!

Thick

0.125 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

4F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

Thick

0.15 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#VALUE!
#REF!
#REF!
202.77
#REF!
#REF!
#REF!

4F
#REF!
#REF!
#REF!
304.15
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#VALUE!
#REF!
#REF!
405.54
#REF!
#REF!
#REF!

Thick

0.175 m
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

4F
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Thick

0.20 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

4F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

Thick

0.25 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

4F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#VALUE!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Thick

0.325 m
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
3F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

4F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Thick

#VALUE!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

0.075 m
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
Thick

#VALUE!
#REF!
#REF!
#REF!
#REF!

0.100 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

#VALUE!
#REF!
#REF!
#REF!

Rs

#REF!

Thick

0.120 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
Thick

#VALUE!
#REF!
#REF!
#REF!
#REF!

0.125 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
Thick

#VALUE!
#REF!
#REF!
#REF!
#REF!

0.150 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
Thick

#VALUE!
#REF!
#REF!
#REF!
#REF!

0.175 m
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
Thick

#VALUE!
#REF!
#REF!
#REF!
#REF!

0.300 m
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs
Thick

#VALUE!
#REF!
#REF!
#REF!
#REF!

0.350 m
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs

#VALUE!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

1 Cum
1 Cum
1 Cum

#REF!

Rs

Rs
3F
#REF!

4F
#REF!

5F
#REF!

#REF!
#REF!
268.80
#REF!
#REF!
#REF!

#REF!
#REF!
403.20
#REF!
#REF!
#REF!

#REF!
#REF!
537.60
#REF!
#REF!
#REF!

#REF!
#REF!

1 Cum
1 Cum
1 Cum

#REF!

Rs

Rs
3F
#REF!

4F
#REF!

5F
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

Rs
4F
#REF!
#REF!
#REF!
52.50

#VALUE!
#REF!
#REF!
#REF!
#REF!

#REF!

Rs

3F
#REF!
#REF!
#REF!
#REF!
35.00

#VALUE!
#REF!
#REF!
#REF!
#REF!

5F
#REF!
#REF!
#REF!
#REF!
70.00

#VALUE!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

#REF!

Rs

Rs

#VALUE!
#REF!
#REF!
#REF!
#REF!

nly. Actual quantity of cement will be as per approved mix design.


uantity shall be as per the mix design. Nominal mix of grades M20

Kgs
350
380
400
420
430

nal mix), using 12mm hard broken stone aggregate including cost
uding the cost of machinery, labour charges, mixing, placing in
mixer)

5.74
1741.81
791.93

1 Kg
1 Cum
1 Cum

1836.80
1567.63
356.37
3760.80

338.60

1 hour

338.60
338.60

504.00
384.00

1 day.
1 day.

50.40
760.32
810.72
4910.12
668.51
5578.63
223.15

Rs

Rs

nal mix), using 12mm hard broken stone aggregate including cost
uding the cost of machinery, labour charges, mixing, placing in
mixer)

5.74
1741.81
791.93

1 Kg
1 Cum
1 Cum

1836.80
1567.63
356.37
3760.80

338.60

1 hour

338.60

338.60
504.00
384.00

1 day.
1 day.
Rs

Rs

50.40
760.32
810.72
4910.12
668.51
5578.63
278.95

r IS 1786-1979) of different diameters for RCC works , including


in position with cover blocks of approved materials and size and
ork as per approved designs and drawings, including cost and
pacer bars including cost and conveyance of binding wire, cover
position, tying including sales and other taxes on all materials etc.,
d.

#REF!

1 Ton

#REF!

1 kg

588.00
384.00

1 day
1 day

5880.00
3840.00

1 MT
Sub Total:
Rs.

#REF!
#REF!
#REF!
#REF!

5/ Fe 500 grade as per IS 1786-1979) of different diameters for


s and shapes, placing in position with cover blocks of approved
t work as per approved designs and drawings, including cost and
hairs, spacer bars including cost and conveyance of binding wire,
acing in position, welding including sales and other taxes on all
ing required to be done compulsorily.

#REF!
#REF!

1 Ton
1 Nos
1 hours
1 kg

504.00
588.00
384.00

1 day
1 day
1 day

1260.00
5880.00
3840.00

1 MT

#REF!
#REF!
#REF!

Sub Total:

#REF!

Rs.

#REF!

Fe 500 grade as per IS 1786-1979) of different diameters for RCC


hapes, placing in position with cover blocks of approved materials
rk as per approved designs and drawings, including cost and
hairs, spacer bars including cost and conveyance of binding wire,
acing in position, welding including sales and other taxes on all
are not welded.

#REF!

1 Ton

#REF!

1 kg

588.00
384.00

1 day
1 day

5880.00
3840.00

1 MT
Sub Total:
Rs.

#REF!
#REF!
#REF!
#REF!

Fe 500 grade as per IS 1786-1979) of different diameters for RCC


hapes, placing in position with cover blocks of approved materials
rk as per approved designs and drawings, including cost and
hairs, spacer bars including cost and conveyance of binding wire,
acing in position, welding including sales and other taxes on all
ing required to be done compulsorily.

#REF!
#REF!

1 Ton
1 Nos
1 hours
1 kg

504.00
588.00
384.00

1 day
1 day
1 day

#REF!

1260.00
5880.00
3840.00

1 MT
Sub Total:
Rs.

#REF!
#REF!
#REF!
#REF!

meters for RCC works , including labour charges for straightening,


roved materials and size and tying and welding using electrodes,
ost and conveyance of steel bars, including all wastages such as
g wire, cover blocks and all incidental, operational, labour charges
all materials etc., complete for finished item of work in all floors.

#REF!

1 Ton

#REF!

1 kg

588.00
384.00

1 day
1 day

5880.00
3840.00

1 MT
Sub Total:
Rs.

#REF!
#REF!
#REF!
#REF!

x7 Cm in Cement Mortor 1:3 Prop including Cost & conveyance


on all materials, including all labour charges like mixing Cement
work

5.74
4700.00
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

551.04
2406.40
158.39
3115.83

1 day.
1 day.
1 day.
Rs

Rs
3F
4214.55
43.17
466.91
93.38
255.04

4F
4214.55
43.17
572.87
114.57
382.57

5F
4214.55
43.17
678.78
135.76
510.09

5073.06
690.70
5763.80

5327.73
725.37
6053.15

5582.35
760.04
6342.40

120.96
252.00
725.76
1098.72
4214.55
573.81
4788.36
4788.40

ortor 1:4 Prop including Cost & conveyance of all Materials like
ncluding all labour charges like mixing Cement Mortor, scaffoding

5.74
4700.00
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

413.28
2406.40
158.39
2978.07

1 day.
1 day.
1 day.
Rs

Rs
3F
4076.79
43.17
466.91
93.38
255.04

4F
4076.79
43.17
572.87
114.57
382.57

5F
4076.79
43.17
678.78
135.76
510.09

4935.30
671.94
5607.25

5189.97
706.61
5896.60

5444.59
741.28
6185.90

120.96
252.00
725.76
1098.72
4076.79
555.05
4631.84
4631.85

ortor 1:5 Prop including Cost & conveyance of all Materials like
ncluding all labour charges like mixing Cement Mortor, scaffoding

5.74
4700.00
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

330.62
2406.40
158.39
2895.41

1 day.
1 day.
1 day.
Rs

Rs
3F
3994.13
43.17
466.91
93.38

4F
3994.13
43.17
572.87
114.57

5F
3994.13
43.17
678.78
135.76

120.96
252.00
725.76
1098.72
3994.13
543.8
4537.93
4537.95

255.04

382.57

510.09

4852.64
660.69
5513.35

5107.31
695.36
5802.70

5361.93
730.03
6092.00

ortor 1:6 Prop including Cost & conveyance of all Materials like
ncluding all labour charges like mixing Cement Mortor, scaffoding

5.74
4700.00
791.93
504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

275.52
2406.40
158.39

1 day.
1 day.
1 day.
Rs

Rs
3F
3939.03
43.17
466.91
93.38
255.04

4F
3939.03
43.17
572.87
114.57
382.57

5F
3939.03
43.17
678.78
135.76
510.09

4797.54
653.19
5450.75

5052.21
687.86
5740.10

5306.83
722.52
6029.35

120.96
252.00
725.76
3939.03
536.3
4475.33
4475.35

ortor 1:8 Prop including Cost & conveyance of all Materials like
ncluding all labour charges like mixing Cement Mortor, scaffoding

5.74
4700.00
791.93
504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

206.64
2406.40
158.39

1 day.
1 day.
1 day.
Rs

Rs
3F
3870.15
43.17
466.91
93.38
255.04

4F
3870.15
43.17
572.87
114.57
382.57

5F
3870.15
43.17
678.78
135.76
510.09

4728.66
643.81
5372.50

4983.33
678.48
5661.85

5237.95
713.15
5951.10

120.96
252.00
725.76
3870.15
526.92
4397.07
4397.10

3 Prop including Cost & conveyance of all Materials like Cement,


labour charges like mixing Cement Mortor, scaffoding charges lift

5.74
5500.00
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

577.44
2860.00
166.31
3603.75

1 day.
1 day.
1 day.
Rs

Rs
3F
4702.47
43.17
466.91
93.38
255.04

4F
4702.47
43.17
572.87
114.57
382.57

5F
4702.47
43.17
678.78
135.76
510.09

5560.98
757.13
6318.15

5815.65
791.80
6607.50

6070.27
826.47
6896.75

120.96
252.00
725.76
1098.72
4702.47
640.24
5342.71
5342.75

4 Prop including Cost & conveyance of all Materials like Cement,


labour charges like mixing Cement Mortor, scaffoding charges lift

5.74
5500.00
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

433.94
2860.00
166.31
3460.25

1 day.
1 day.
1 day.
Rs

Rs
3F
4558.97
43.17
466.91
93.38
255.04

4F
4558.97
43.17
572.87
114.57
382.57

5F
4558.97
43.17
678.78
135.76
510.09

5417.48

5672.15

5926.77

120.96
252.00
725.76
1098.72
4558.97
620.7
5179.67
5179.70

737.59
6155.10

772.26
6444.45

806.93
6733.70

5 Prop including Cost & conveyance of all Materials like Cement,


labour charges like mixing Cement Mortor, scaffoding charges lift

5.74
5500.00
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

347.16
2860.00
166.31
3373.47

1 day.
1 day.
1 day.
Rs

Rs
3F
4472.19
43.17
466.91
93.38
255.04

4F
4472.19
43.17
572.87
114.57
382.57

5F
4472.19
43.17
678.78
135.76
510.09

5330.70
725.78
6056.50

5585.37
760.45
6345.85

5839.99
795.11
6635.10

120.96
252.00
725.76
1098.72
4472.19
608.89
5081.08
5081.10

6 Prop including Cost & conveyance of all Materials like Cement,


labour charges like mixing Cement Mortor, scaffoding charges lift

5.74
5500.00
791.93
504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

289.30
2860.00
166.31

1 day.
1 day.
1 day.
Rs

Rs
3F
4414.33
43.17
466.91
93.38
255.04

4F
4414.33
43.17
572.87
114.57
382.57

5F
4414.33
43.17
678.78
135.76
510.09

5272.84

5527.51

5782.13

120.96
252.00
725.76
4414.33
601.01
5015.34
5015.35

717.90
5990.75

752.57
6280.10

787.24
6569.40

8 Prop including Cost & conveyance of all Materials like Cement,


labour charges like mixing Cement Mortor, scaffoding charges lift

5.74
5500.00
791.93
504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

216.97
2860.00
166.31

1 day.
1 day.
1 day.
Rs

Rs
3F
4342.00
43.17
466.91
93.38
255.04

4F
4342.00
43.17
572.87
114.57
382.57

5F
4342.00
43.17
678.78
135.76
510.09

5200.51
708.05
5908.60

5455.18
742.72
6197.95

5709.80
777.39
6487.20

120.96
252.00
725.76
4342.00
591.16
4933.16
4933.20

cond class traditional size bricks including cost of all materials,


cement mortar, curing etc., complete for finished item of work, but

4700.00
5.74
791.93
504.00
450.00
384.00

1000 Nos
1 Kg
1 Cum

2655.50
608.44
174.22

1 day.
1 day.
1 day.
Rs

Rs
3F
5066.56
99.30
1073.90
214.78
586.60

4F
5066.56
99.30
1317.60
263.52
879.90

5F
5066.56
99.30
1561.20
312.24
1173.20

7041.14
958.65
7999.80

7626.88
1038.40
8665.30

8212.50
1118.13
9330.65

302.40
270.00
1056.00
0.00
5066.56
689.81
5756.37
5756.40

g strength of not less than 35.00kg/cm2 and using two mild steel
rk including cost and seignorage charges and conveyance of all
labour charges such as scaffolding mixing mortor constructing
n charges for finished item of work as per SS 509rials.

4700.00
2356.28
504.00
450.00
384.00

1000 Nos
1 Cum

2406.40
471.26

1 day.
1 day.
1 day.
Rs

Rs
3F
4506.06
99.30
1073.90
214.78
586.60

4F
4506.06
99.30
1317.60
263.52
879.90

5F
4506.06
99.30
1561.20
312.24
1173.20

6480.64
882.34
7363.00

7066.38
962.09
8028.50

7652.00
1041.82
8693.85

302.40
270.00
1056.00
0.00
4506.06
613.5
5119.56
5119.60

ricks or moulded bricks including making horizontal and vertical


d all operations, mixing cement mortar, curing etc., complete for

5500.00
5.74
791.93

504.00
450.00
384.00

1000 Nos
1 Kg
1 Cum

2860.00
275.52
158.39
0.00

1 day.
1 day.
1 day.
Rs

Rs
3F
4813.05
43.20
466.91
93.38
255.00

4F
4813.05
43.20
572.87
114.57
382.50

5F
4813.05
43.20
678.78
135.76
510.00

5671.55
772.18

5926.19
806.85

6180.79
841.51

287.28
256.50
975.36
4813.05
655.3
5468.35
5468.35

6443.75

6733.05

7022.30

excluding pointing and plastering as per drawing and technical

5500.00
3045.08

1000 Nos
1 Cum

504.00
384.00

2887.50
730.82

1 day.
1 day.
Rs

Rs
3F
11231.30
255.00

4F
11231.30
382.50

5F
11231.30
510.00

11486.30
1563.86
13050.20

11613.80
1581.22
13195.05

11741.30
1598.58
13339.90

1008.00
721.92
5348.24
5883.06
11231.30
1529.14
12760.44
12760.45

ork .
0 Nos.

ement Mortar 1:5 including White Washing 2 Coats including cost


em of work,

4700.00
2631.80

1000 Nos
1 Cum

504.00
450.00
384.00

3525.00
1763.30

1 day.
1 day.
1 day.
Rs

Rs
3F

4F

5F

11950.16

11950.16

11950.16

43.20

43.20

43.20

466.91

572.87

678.78

93.38

114.57

135.76

255.00

382.50

510.00

12808.65

13063.30

13317.90

1743.90

1778.57

1813.23

14552.60

14841.90

15131.15

1214.64
2794.50
2534.40
118.32
11950.16
1627.01
13577.17
13577.20

ment Mortar 1:5 including White Washing 2 Coats including cost of


m of work,

5500.00
2631.80

1000 Nos
1 Cum

504.00
450.00
384.00

4345.00
1763.30

1 day.
1 day.
1 day.
Rs

Rs
3F

4F

1214.64
2794.50
2534.40
126.52
12651.84
1722.55
14374.39
14374.40

5F

12651.84

12651.84

12651.84

43.20

43.20

43.20

466.91

572.87

678.78

93.38

114.57

135.76

255.00

382.50

510.00

13510.34

13764.98

14019.58

1839.43

1874.10

1908.77

15349.80

15639.10

15928.35

mm for manufacturing of flyash solid blocks using flyash of 80 kgs,


all materials, labour charges, seiniorage charges, scaffolding and
erstructure Walls.

24000.00
2356.28
504.00
450.00
384.00

1000 Nos
1 Cum

2376.00
235.63

1 day.
1 day.
1 day.
Rs

Rs
3F
4F
5F
4312.51
4312.51
4312.51
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

211.68
414.00
1075.20
4312.51
587.15
4899.66
4899.70

size 290 x 200 x 140 mm for manufacturing of flyash solid blocks


ost and conveyance of all materials, labour charges, seiniorage
0 kg/sqm for walls for Superstructure Walls.

19000.00
2356.28
504.00
450.00
384.00

1000 Nos
1 Cum

2109.00
235.63

1 day.
1 day.
1 day.
Rs

Rs
3F
4045.51
49.65
536.95
107.39
293.30

4F
4045.51
49.65
658.80
131.76
439.95

5F
4045.51
49.65
780.60
156.12
586.60

5032.80
685.22
5718.05

5325.67
725.09
6050.80

5618.48
764.96
6383.45

211.68
414.00
1075.20
4045.51
550.8
4596.31
4596.35

f size 290 x 112/100 x 140 mm for manufacturing of flyash solid


ncluding cost and conveyance of all materials, labour charges,
lessthan 50 kg/sqm for walls for Superstructure Walls.

11000.00
2356.28
504.00
450.00
384.00

1000 Nos
1 Cum

2442.00
235.63

1 day.
1 day.
1 day.
Rs

Rs
3F
4378.51
99.30
1073.90
214.78
586.60

4F
4378.51
99.30
1317.60
263.52
879.90

5F
4378.51
99.30
1561.20
312.24
1173.20

6353.09
864.97
7218.10

6938.83
944.72
7883.55

7524.45
1024.45
8548.90

211.68
414.00
1075.20
4378.51
596.13
4974.64
4974.65

SH & GRAVEL BACKING

stone including cost & Conveyance of all materials like Cement,


harges for cutting Stones to required size and shape, mixing of
of Work .

5.74
896.81
1684.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

661.25
798.16
269.57
126.71

504.00
450.00
384.00
384.00

1 day
1 day
1 day
1 day

529.20
1102.50
1344.00
1075.20
5906.59
804.18
6710.77
6710.80

Rs

Rs

e stone including cost & Conveyance of all materials like Cement,


harges for cutting Stones to required size and shape, mixing of
of Work .

5.74
1112.81
1684.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

1157.18
1046.04
269.57
221.74

504.00
384.00

1 day
1 day

1260.00
890.88
4845.41
659.7
5505.11
5505.15

Rs

Rs

e stone including cost & Conveyance of all materials like Cement,


harges for cutting Stones to required size and shape, mixing of
of Work .

5.74
1112.81
1684.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

771.46
1046.04
269.57
221.74

504.00
384.00

1 day
1 day

1260.00
890.88
4459.69
607.19
5066.88
5066.90

Rs

Rs

e stone including cost & Conveyance of all materials like Cement,


harges for cutting Stones to required size and shape, mixing of
of Work .

5.74
1112.81
1684.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

578.59
1046.04
269.57
221.74

504.00
384.00

1 day
1 day

1260.00
890.88
4266.82
580.93
4847.75
4847.75

Rs

Rs

e stone including cost & Conveyance of all materials like Cement,


harges for cutting Stones to required size and shape, mixing of
of Work .

5.74
1112.81
1922.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

385.73
1046.04
307.65
221.74

504.00
384.00

1 day
1 day

1260.00
890.88
4112.04
559.85
4671.89
4671.90

Rs

Rs

granite stone including cost & Conveyance of all materials like


,labour charges for cutting Stones to required size and shape,
hed item of Work .

5.74
1112.81
1922.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum

440.83
1046.04
307.65
253.42

504.00
384.00

1 day
1 day

756.00
890.88
3694.82
503.05
4197.87
4197.90

Rs

Rs

ncluding cost & Conveyance of all materials like Cement, Sand ,


for cutting Stones to required size and shape, mixing of Cement

5.74
1112.81
896.81
1922.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum
1 Cum

454.61
489.64
448.41
307.65
261.34

504.00
384.00

1 day
1 day

604.80
768.00
3334.45
453.99
3788.44
3788.45

Rs

Rs

. For lesser span length the addition shall be 80 per cent for

ncluding cost & Conveyance of all materials like Cement, Sand ,


for cutting Stones to required size and shape, mixing of Cement

5.74
1112.81
896.81
1922.81
791.93

1 Kg
1 Cum
1 Cum
1 Cum
1 Cum

340.96
489.64
448.41
307.65
261.34

504.00
384.00

1 day
1 day

604.80
768.00
3220.80
438.51
3659.31
3659.35

Rs

Rs

cluding cost & conveyance of all materials to site , seignaiorage


d item of work

5.74
791.93

1 Kg
1 Cum

82.66
23.76

450.00
384.00

1 day
1 day

225.00
284.16
615.58
83.81
699.39
699.40

Rs

Rs

cluding cost & conveyance of all materials to site , seignaiorage


d item of work

5.74
791.93

1 Kg
1 Cum

165.31
47.52

450.00
384.00

1 day
1 day

225.00
284.16
721.99
98.3
820.29
820.30

Rs

Rs

d conveyance of all materials to site, seigniorage charges on all


., including cutting grooves where ever necessary etc., complete

3733.88

1 Cum

560.08

504.00
384.00

1 day
1 day

302.40
368.64
1231.12
167.62
1398.74
1398.75

Rs

Rs
3F
1231.12
9.90
107.40
21.48
58.70

4F
1231.12
9.90
131.80
26.36
88.05

5F
1231.12
9.90
156.10
31.22
117.40

1428.60
194.50
1623.10

1487.23
202.49
1689.75

1545.74
210.45
1756.20

d conveyance of all materials to site, seigniorage charges on all


., including cutting grooves where ever necessary etc., complete

3045.08

1 Cum

456.76

504.00
384.00

1 day
1 day

302.40
368.64
1127.80
153.55
1281.35
1281.35

Rs
3F
1127.80
9.90
107.40
21.48
58.70

4F
1127.80
9.90
131.80
26.36
88.05

5F
1127.80
9.90
156.10
31.22
117.40

1325.28
180.44
1505.75

1383.91
188.42
1572.35

1442.42
196.39
1638.85

d conveyance of all materials to site, seigniorage charges on all


., including cutting grooves where ever necessary etc., complete

2356.28

1 Cum

353.44

504.00
384.00

1 day
1 day

302.40
368.64
1024.48
139.48
1163.96
1164.00

Rs

Rs
3F
1024.48
9.90
107.40
21.48
58.70

4F
1024.48
9.90
131.80
26.36
88.05

5F
1024.48
9.90
156.10
31.22
117.40

1221.96
166.37
1388.35

1280.59
174.35
1454.95

1339.10
182.32
1521.45

d conveyance of all materials to site, seigniorage charges on all


., including cutting grooves where ever necessary etc., complete

3045.08

1 Cum

578.56

504.00
384.00

1 day
1 day
Rs

Rs
3F
1249.60
9.90
107.40
21.48
58.70

4F
1249.60
9.90
131.80
26.36
88.05

5F
1249.60
9.90
156.10
31.22
117.40

1447.08
197.02
1644.10

1505.71
205.00
1710.75

1564.22
212.97
1777.20

302.40
368.64
1249.60
170.13
1419.73
1419.75

d conveyance of all materials to site, seigniorage charges on all


., including cutting grooves where ever necessary etc., complete

3045.08

1 Cum

639.47

504.00
384.00

1 day
1 day

473.76
614.40
1727.63
235.22
1962.85
1962.85

Rs

Rs
3F
1727.63
9.90
107.40
21.48
58.70

4F
1727.63
9.90
131.80
26.36
88.05

5F
1727.63
9.90
156.10
31.22
117.40

1925.11
262.10
2187.25

1983.74
270.09
2253.85

2042.25
278.05
2320.30

of 4mm thick in C.M. (1:3) with dubara sponge finishing including


rges, all operational, including charges, labour charges for mixing
r necessary etc., complete for finished item of work of uneven

5.74
791.93

1 Kg
1 Cum

246.82
142.55

5.74
791.93

1 Kg
1 Cum

83.23
31.68

504.00
450.00
384.00

1 day
1 day
1 day
Rs

Rs
3F
2980.90
9.90
107.40
21.48
58.70

4F
2980.90
9.90
131.80
26.36
88.05

5F
2980.90
9.90
156.10
31.22
117.40

3178.38
432.74
3611.15

3237.01
440.72
3677.75

3295.52
448.69
3744.25

317.52
661.50
1497.60
2980.90
405.85
3386.75
3386.75

of 4mm thick in C.M. (1:3) with dubara sponge finishing including


rges, all operational, including charges, labour charges for mixing
essary etc., complete for finished item of work.

5.74
791.93

1 Kg
1 Cum

181.96
87.11

5.74
791.93

1 Kg
1 Cum

83.23
31.68

504.00
450.00
384.00

1 day
1 day
1 day
Rs

Rs
3F
2860.60
9.90
58.70
11.74
58.70

4F
2860.60
9.90
58.70
11.74
88.05

5F
2860.60
9.90
58.70
11.74
117.40

2999.64
408.40
3408.05

3028.99
412.40
3441.40

3058.34
416.39
3474.75

317.52
661.50
1497.60
2860.60
389.47
3250.07
3250.10

forcement as directed by Engineer-in-charge with dubara sponge


& other taxes on all materials, operational & incidental, cost and
work, lift charges etc., complete for finished items of work but
903)

#REF!
3733.88
5.74
1231.12

1 sqm
1 cum
1 kg
10 sqm

#REF!
933.47
287.00
2683.84

504.00
450.00
384.00

1 day
1 day
1 day

4032.00
450.00
3840.00

#REF!

1 Hrs

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs
Rs

& SKIRTING

) set over base coat of CM (1:8) over already laid CC bed / RCC
sqm. & Jointed with neat cement to full depth including cost of all
orage charges, labour charges for dressing of flooring stones etc.,

1654.00

10 sqm

1819.40

5.74
5.74
5.74
791.93

1 kg.
1 kg.
1 kg.
1 cum

123.98
189.42
114.80
95.03

504.00
450.00
384.00

1 day
1 day
1 day

1562.40
495.00
330.24
47.30
4777.57
650.47
5428.04
5428.05

Rs

Rs

mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof


f all materials like flooring stone, cement, sand, and water etc.,
etc., complete for finished item of work, but excluding the cost of

#REF!

1 Sqm

#REF!

5.74
5.74
791.93
791.93

1 Kg
1 Kg
1 Cum
1 Cum

123.98
55.10
95.03
15.84

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
#REF!
#REF!
#REF!
#REF!

Rs

Rs

coat of cement mortar (1:6) 20 mm thick (joints of stone must be


y like consistency spread @ 3.30 kgs per sqm. Jointed with neat
rials like flooring slab, cement, sand, and water etc., complete,
ing stones etc., complete for finished item of work, but excluding

589.00

1 Sqm

6184.50

5.74
5.74
29.00
791.93

1 Kg
1 Kg
1 Cum
1 Cum

275.52
189.42
145.00
158.39

2145.00

1 day

2145.00

504.00
450.00
384.00

1 day
1 day
1 day

1058.40
1350.00
1920.00
13426.23
1827.98
15254.21
15254.25

Rs

Rs

coat of cement mortar (1:6) 12 mm thick over CC bed already laid


kgs per sqm & jointed with neat cement to full depth mixed with
tiles etc., complete, including seigniorage charges, complete for

#REF!

1 sqm

#REF!

5.74
5.74
5.74
791.93

1 kg.
1 kg.
1 kg.
1 kg.
1 cum

165.31
189.42
34.44
0.00
95.03

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs

mortar (1:8), 12 mm thick over CC bed already laid or RCC roof


& jointed neatly with white cement paste to full depth mixed with
s etc., complete, including seigniorage charges, etc., complete for

1274.00
5.74
5.74
5.74
791.93
791.93

1 sqm
1 kg.
1 kg.
1 kg.
1 cum
1 cum

13377.00
123.98
189.42
34.44
95.03
15.84

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
16594.75
165.95
16760.70
2281.97
19042.67
19042.70

Rs

12 mm thick over CC bed already laid or RCC roof slab, including


tly with white cement paste to full depth mixed with pigment of
mplete, including seigniorage charges, etc., complete for finished

#REF!
5.74
5.74
29.00
791.93

1 sqm
1 kg.
1 kg.
1 kg.
1 cum

#REF!
123.98
189.42
58.00
95.03

504.00
450.00
384.00

1 Nos
1 Nos
1 Nos

483.84
1008.00
1267.20
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs

over base coat of cement mortar (1:8), 20 mm thick over CC bed


ead @ 3.3.kgs per sqm & jointed neatly with white cement paste
ement, sand water and tilesetc., complete, including seigniorage
cluding the cost of conveyance of all materials

#REF!

1 sqm

#REF!

1 kg.
1 kg.
1 kg.

206.64
189.42
34.44

791.93

1 cum

158.39

504.00
450.00
384.00

1 day
1 day
1 day

1512.00
450.00
3072.00
#REF!
#REF!
#REF!
#REF!
#REF!

5.74
5.74
5.74

Rs

Rs

(1:8), 12 mm thick over CC bed already laid or RCC roof slab,


d neatly with white cement paste mixed with pigment of matching
mplete, including seigniorage charges, etc., complete for finished

#REF!
5.74
5.74
29.00
791.93

1 Sqm
1 Kg
1 Kg
1 Cum
1 Cum

#REF!
206.64
189.42
145.00
158.39

504.00
384.00

1 day
1 day

2016.00
3072.00
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs

ase coat of cement mortar (1:6), 12 mm thick over CC bed already


#REF!
1 Sqm
#REF!
5.74
791.93

1 Kg
1 Cum

275.52
158.39

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs

t mortar (1:6), 12 mm thick over CC bed already laid or RCC roof


#REF!
1 Sqm
#REF!
5.74
1 Kg
165.31
5.74
1 Kg
189.42

29.00
791.93

1 Kg
1 Cum

174.00
95.03

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs

d granite machine crushed metal laid over CC bed already laid or


1563.81
1 Cum
265.85
5.74
1 Kg
688.80
791.93
1 Cum
67.31
504.00
450.00
384.00

1 day
1 day
1 day
Rs

Rs

630.00
27.00
1152.00
2830.96
28.31
2859.27
389.29
3248.56
3248.60

ver with 12 mm thick in CM(1:3) and finishing the top surface to


3434.75
1231.12

1 cum
10 sqm

3434.75
1231.12

504.00
450.00
384.00

1 day
1 day
1 day

75.60
157.50
2073.60
69.73
7042.30
958.81
8001.11
8001.15

Rs

m thick length equal to flooring stones, set over base coat of CM


#REF!
791.93
5.74
5.74
29.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

#REF!
95.03
330.62
189.42
174.00

504.00
384.00

1 Nos
1 Nos

388.08
307.20
#REF!
#REF!
#REF!
#REF!

Rs

Rs

.mm thickness, length equal to flooring stones, set over base coat
#REF!
5.74
5.74
5.74
29.00
#REF!

1 sqm
1 cum
1 kg
1 kg
1 kg
1 RM
1 RM

#REF!
0.69
330.62
189.42
145.00
#REF!
#VALUE!

504.00
384.00
384.00
384.00

1 day
1 day
1 day
1 day

1058.40
1881.60
1536.00
1536.00
#REF!
#REF!
#REF!
#REF!

Rs

equal to flooring stones, set over base coat of CM (1:5) 12 mm


1274.00
791.93
5.74
5.74
29.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

13377.00
95.03
198.37
189.42
58.00

504.00
450.00
384.00

1 day
1 day
1 day

483.84
1008.00
1267.20
166.77
16843.63
2293.26
19136.89
19136.90

Rs

olished granite tiles length equal to flooring stones, set over base
te of 3.30 kgs per sqm and jointed with white cement paste mixed
ent, sand and water etc., complete including seigniorage charges,

#REF!
791.93
5.74
5.74
29.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

#REF!
95.03
330.62
189.42
145.00

504.00
450.00
384.00

1 day
1 day
1 day

1058.40
360.00
1881.60
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

polished Shahabad stone length equal to flooring stones, set over


the rate of 3.30 kgs per sqm and jointed with white cement paste
hahabad stone, cement, sand and water etc., complete including
veyance of all materials

1654.00
791.93
5.74
5.74

10 sqm
1 cum
1 kgs
1 kgs

1819.40
95.03
330.62
189.42

504.00
450.00
384.00

1 Nos
1 Nos
1 Nos

483.84
1008.00
1190.40
51.17
5167.88
723.5
5891.38
5891.40

Rs

Rs

CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey
d wiyh neat White cement paste mixed with pigmant of matching
es etc. to site, all operational, incidental and labour charges such
em of work (for toilets)

#REF!
791.93
5.74
5.74
29.00

1 Sqm
1 cum
1 kgs
1 kgs
1 kgs

#REF!
95.03
330.62
189.42
174.00

504.00
384.00

1 day
1 day

388.08
307.20
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

ING

th 1kg of water proof compound per bag of cement laid over roof
e charges of materials and including all operational, incidental and
ding off junctions of wall and slab etc,, complete for finished item

3733.88
#REF!

1 Cum
1 Kg

504.00
450.00
384.00

1 day
1 day
1 day

784.11

332.64
693.00
1420.80

Rs

Rs

3230.55
439.84
3670.39
3670.40

ith bitumen & G.I limpet washers filled with white lead & including
#REF!

1 kgs

#REF!

1 nos

#VALUE!

1 nos

#VALUE!

1 nos

#VALUE!

1 nos
1 litre

#VALUE!
#VALUE!

1 litre

#VALUE!

450.00
384.00

1 day
1 day

378.05
349.66

588.00
384.00

1 day
1 day

36.01
23.52

588.00
384.00

1 day
1 day

80.63
52.66
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs
Rs

nuts 8 mm dia G.I plain washers complete including seigniorage


#REF!

1 Sqm

#REF!

1 nos
1 nos
1 nos

450.00
384.00

1 day
1 day

#REF!

194.49
207.55
10.00
10.00

Rs
Rs

#REF!
#REF!
#REF!
#REF!
#REF!

rior Gr-2 after thoroughly brushing the surface to remove all dirt

#REF!
504.00
450.00

1 Kg
1 day
1 day

Rs

#REF!
105.84
220.50
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

ughly brushing the


surface to remove
all dirt and remains of#REF!
loose
#REF!
1 Kg
10.00
504.00
384.00

1 day
1 day

Rs

55.44
84.48
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

horoughly brushing
the surface to remove
all dirt and remains
of
#REF!
1 Kg
#REF!
10.00
504.00
384.00

1 day
1 day

Rs

Rs

105.84
122.88
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

ver Priming Coat, One Coat (All Colours) making 2 coats in#REF!
all to
#REF!
25 Kg
#REF!
504.00
1 day
45.36
450.00
1 day
94.50
384.00
1 day
576.00
#REF!
#REF!
#REF!
#REF!
Rs
#REF!

ver Priming Coat, Two Coat (All Colours) making 3 coats in#REF!
all to
#REF!
25 Kg
#REF!
504.00
1 day
75.60
450.00
1 day
157.50
384.00
1 day
576.00
#REF!
#REF!
#REF!
#REF!
Rs
#REF!

ade over a base#REF!


coat of approved 1cement
primer grade I making
Kg
#REF!
504.00
1 day
105.84
450.00
1 day
220.50
#REF!
1 Kg
#REF!
504.00
1 day
75.60
450.00
1 day
157.50
384.00
1 day
576.00
Rs
#REF!
#REF!
#REF!
Rs
#REF!

oved brand and shade over a base coat of appropriate primer of


#REF!
1 Kg
#REF!
576.00
1 day
46.08
450.00
1 day
85.50
#REF!
1 Kg
#REF!
576.00
1 day
207.36
450.00
1 day
378.00
Rs
#REF!
#REF!
#REF!
Rs
#REF!

& New Iron Work


including cost and
#REF!
1 Ltrconveyance of all materials
#REF!
504.00
450.00

1 day.
1 day.
Rs

Rs

105.84
220.50
0.00
#REF!
#REF!
#REF!
#REF!

ATORS

locked together through their entire length and jointed together at


al bore MS B class
pipe with brackets,
#REF!
1 Sqmplates, guide channels,
#REF!
#REF!
Rs
#REF!

BUILDINGS
WITHsize
GRILL
PROVISION)
Providing
and Fixing
r frame section
of 48x50mm
shutter
frame section
size of
#REF!
1 Sqm
#REF!
#REF!
#REF!
Rs
#REF!
frame section size of 48x50mm. Shutter frame section size of
#REF!
1 Sqm
#REF!
#REF!
#REF!
Rs
#REF!

DINGS WITH GRILL & FLYMESH PROVISION) Providing & Fixing


dframe
as persection
IS 277 size
with zinc
of 150 GSM).
Primer
coated
withsize
epoxy
of 72x50mm.
Shutter
frame
section
of
#REF!
1 Sqm
#REF!
#REF!
#REF!
Rs
#REF!

from Roll formed sections made of galvanized Steel colour


h zinc of 120 GM/Sq.mtr)
with total1 coated
#REF!
Sqm thickness of 0.60mm.
#REF!
#REF!
#REF!
Rs
#REF!

SOLID SINGLE #REF!


SIDE PRELAM PANEL
1 SqmPVC DOOR SHUTTER
#REF!
#REF!
#REF!
Rs
#REF!

Board as per IS 14276


Equivalent) : Providing
and
#REF! (Bison Panel1 orSqm
#REF!
#REF!
#REF!
Rs
#REF!

of 100 mm centre
,Bracers with flat1iron
40x40x6 mm with 38
mm
#REF!
Sqm
#REF!
#REF!
#REF!
Rs
#REF!

oard as per IS 14276


equivalent) : Providing
and
#REF!(Bison Panel1orSqm
#REF!
#REF!
#REF!
Rs
#REF!

m shutter frame#REF!
section size of 46x46mm
of
1 Sqm mullion section size
#REF!
#REF!
#REF!
Rs
#REF!

luding all labour #REF!


charges etc., complete
1 Sqm

#REF!

Rs

#REF!
#REF!
#REF!

0mm MS square bars horizontally at 125mm centre to centre and


ach side) duly 1.50
making cutting
brick masonry, 2.25
fixingSqm
and making to
=
6.00

Rmt

7.50 Rmt
15.00 Rmt
22.50 Rmt

#REF!

1000 Kg
1000 Kg
1 Kg

7.20

Kgs

17.55
24.75

Kgs
Kgs
#REF!

Rs.
Rs.
Rs.

#REF!
#REF!
#REF!

rcharges for lifting and fixing the stone in position at all levels:
#REF!
1 Sqm
#REF!
1 Rmt

Rs
Rs

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

sign in plate No. 22/2/2. (earth work & concrete to be paid for

#REF!

1m

#REF!

450.00
504.00
384.00

1 day
1 day
1 day

45.00
201.60
153.60
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rs
Rs

sing 15 mm/ 19 mm thick Thermocole sheet anodised Aluminium


#REF!

1 sqm

#REF!

1 RM
1 RM
1 Nos
1 Nos
504.00
450.00
504.00
450.00
450.00
504.00
384.00

1 day
1 day
1 day
1 day
1 day
1 day
1 day

181.44
162.00
0.00
0.00
9.00
20.16
76.80

#REF!

1 Hrs

#REF!

1 Hrs

Rs

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

ng false ceiling system manufactured by M/s Arm strong world


#REF!

1 sqm

#REF!

1 RM
1 RM

1 RM

#REF!

1 RM
1 Nos

#REF!

504.00
450.00
504.00
450.00
450.00
504.00
384.00

1 day
1 day
1 day
1 day
1 day
1 day
1 day

201.60
180.00
40.32
36.00
18.00
20.16
92.16

#REF!

1 Hrs
1 Hrs

#REF!

Rs

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

all material and all labour


3.56 chages etc complete.
0.18
3.74
45.00
length
1.00
#REF!

1 Kg

0.150 Sqm
10

168.21

Sqm

Rs

#REF!
#REF!
#REF!
#REF!

ngth driven in to the hole drilled in bed rock and remaining length
#REF!

1 Kg

#REF!

1 Nos
1 Nos

588.00
450.00
384.00

1 day
1 day
1 day
Rs

Rs
Rs

#REF!

1 Kg

#REF!

1 Nos

294.00
225.00
384.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

1 Nos

588.00
450.00
384.00

1 day
1 day
1 day
Rs

Rs
Rs

#REF!

1 Kg

#REF!

1 Nos

294.00
225.00
384.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

1 Nos

588.00
450.00
384.00

1 day
1 day
1 day
Rs

Rs
Rs

294.00
225.00
384.00
#REF!
#REF!
#REF!
#REF!
#REF!

38 Kg per 100 metres (min.), Straining and fixing to any type of


eel wire, stapples or steel pins, etc., as directed (Posts and struts

#REF!

1 Rmt

#REF!

#REF!

588.00
450.00
384.00

1 No
1 No
1 No

Rs

88.20
67.50
115.20
0.00
2.71
#REF!
#REF!
#REF!
#REF!
#REF!

g to IS 226 and IS 808 as directed by the departmental officers


nd painting the angles
of Synthetic anamel painting
#REF!with two coats
1 Kg
#REF!
1 Kg

1 Kg

#REF!

10 Sqm
Rs

#REF!
#REF!

ms and Girders including


etc
#REF! cost of welding
1 Kg rods, power charges,
#REF!
#REF!
#REF!
#REF!
#REF!
Rs
#REF!

ders erecting in #REF!


position and fixing1by
Kgusing chain pulley blocks,
#REF!
#REF!
#REF!
#REF!
#REF!
Rs
#REF!

of all material , labour charges for fabrication and fixing in postion


#REF!
1 Kg
#REF!
Err:509

1 Kg

#REF!
#REF!

1 Kg
1 Kg

Rs

#REF!
#REF!
#REF!

ize 40x40x6 mm with 10 mm square rod at bottom for tie rod


0x5 mm MS Flat 200 mm long, including c/c5.90
of all materials
Rmt and
3.50
20.65 Kgs
0.78
1.08 Kgs
0.78
1.40 Kgs
23.13 Kgs
Kgs
#REF! Kg
#REF!
Nos.
each
Kg
Kg
#VALUE!
kg
Kg
0.03
Each
#REF!
#REF!
Rate per
1 Rmt

type with commercial ply on both faces with 1no. 300 mm long
g door latch 1 No. door stopper ( all fixturs MS Powder coated
1.845 Sqm
670.00

1 Sqmt

124.00

23.00

27.00

39.00

#REF!

1236.15
124.00

each

46.00

each

27.00

each

39.00

each

1 Sqmt

Rate per

#REF!
Each

#REF!

1 Sqm

#REF!

y fixed post and MS Window Section of E Z 7 with lugs, glazing


uare bars @ 10cm
c/c as per1.44
approved
Area
Sqm design with cost and

2.40
2.40
0.80
5.60 Rmt
2.40
4.80
7.20 Rmt
12.80 Rmt
1.20 Rmt
14.40 Rmt
1.44 Sqm

1.03 Kg/Rmt

13.20 Kgs

1.15 Kg/Rmt

1.40 Kgs

0.78 Kg/Rmt

11.20 Kgs

#REF!

1 kg
1 kg

#REF!
#VALUE!

1 each

#VALUE!

1 sqm

#VALUE!

1 sqm
1 Kg

#VALUE!
#VALUE!

1 Kg

#VALUE!

Rate per

Each

#REF!

1 Sqm

#REF!

5mm long hinges and shutter with 10 mm thick plaing cement


alent ) including cost and conveyance of all
materials
1.5375
Sqmand labour
0.78 Kg/Rmt

0.936

1.10
#REF!

8.69 Kgs
1.00
1.00
1.00

261.00

1.00

#REF!

1.00

Kgs

Kg
Kg
Kg

#REF!

Sqm

401.29

Nos

27.00

1.00

Nos

#REF!

1.00

Sqm

Each
Rate per

54.00

#REF!
1 Sqm

#REF!

uble layer approved


brand & manufacture
#REF!
1 Kg with cover and suitable
#REF!
#VALUE!
#REF!
14%
#REF!
#REF!
#REF!

thoroughly brushing the surface to remove all dirt and remains


of
#REF!
#REF!
Rs
#REF!
#REF!
#REF!

Rs

#REF!

Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c,


m centre to centre
of MSSqm
Z holdfasts (2
1.50including
= fixing with 4 Nos2.625

4.00
3.00
2.00
9.00 Rmt
4.00 Kg/Rmt
3.00

36.00 Kgs

2.60 Kg/Rmt

7.80 Kgs
43.80 Kgs

21.00 Rmt
21.00 Rmt
1.13 Kg/Rmt
0.450 Sqm

23.73 Kgs

15.70 Kg/Sqm

#REF!

#REF!
#REF!

7.07 Kgs
74.60 Kgs
1 Kg
1 Kg
1 Kg
1 Kg

#REF!
#VALUE!
#VALUE!
#VALUE!

1 Kg

#VALUE!

10 Sqm
1 No

#REF!
#REF!

1 No

#VALUE!

#REF!
#REF!
Rs.
#REF!
#REF!
#REF!
#REF!
materials like cement, sand, bricks, water etc., to site, including
ur charges such as mixing cement mortar, constructing masonry,
low Birck (16"X8"X6"). (APSS No. 501 & 504).
14%

12.25
2356.28
504.00
450.00
384.00

1 Nos
1 cu.m.
1 Each
1 Each
1 Each
Total

931.00
353.44
302.40
270.00
1056.00
2912.84
396.58
3309.42

Rs

3309.45

3F

4F

5F

2912.84
66.20
715.93
143.19
391.07

2912.84
66.20
878.40
175.68
586.60

2912.84
66.20
1040.80
208.16
782.13

4229.23
575.81
4805.05

4619.72
628.98
5248.75

5010.13
682.13
5692.30

of 6mm dia MS bars embedded in every 3rd layer with free ends
luding c/c of all materials like cement, sand, bricks, water etc., to
nd labour charges such as mixing cement mortar, constructing
e of steel and its fabrication charges complete for finished item of

8.25
2356.28
504.00
450.00
384.00

1
1

Nos
cu.m.
Each
Each
Each
Total

Rs
3F
2866.97
99.30
1073.90
214.78
586.60

4F
2866.97
99.30
1317.60
263.52
879.90

5F
2866.97
99.30
1561.20
312.24
1173.20

4841.55
659.18
5500.75

5427.29
738.92
6166.25

6012.91
818.66
6831.60

932.25
306.32
302.40
270.00
1056.00
0.00
2866.97
390.34
3257.31
3257.35

Page 2510 of 3205

Building Data

GAJWEL PRAGNAPUR NAGARA PANCHAYATHI


DATA BASED ON - 2013 - 2014SSR
3rd Quarter ( December - 2013 )
Lead 25 Km

Cost of Material
150mm size soling stone

Basic rate as per R & B SSR item No.79.z3 -Pg-17


Add Blasting Charges
Add Machine Crushing charges @
Add Seignorage charges excluding CP ( C-Mat)
Add Lead charges excluding CP ( C-Mat)

1 Cum
1 Cum
25%

Total per 1 Cum.

65mm size HG Metal


Basic rate as per R & B SSR item No.33 - I -Pg-17
Add Blasting Charges
Add Machine Crushing charges @
Add Seignorage charges excluding CP ( C-Mat)
Add Lead charges excluding CP ( C-Mat)

1 Cum
1 Cum
25%

Total per 1 Cum.

40mm size HG Metal


Basic rate as per R & B SSR item No.30- f -Pg-17
Add Blasting Charges
Add Machine Crushing charges @
Add Seignorage charges excluding CP ( C-Mat)
Add Lead charges excluding CP ( C-Mat)

1 Cum
1 Cum
25%

Total per 1 Cum.

20mm size HG Metal


Basic rate as per R & B SSR item No.28 - d -Pg-17
Add Blasting Charges
Add Machine Crushing charges @
Add Seignorage charges excluding CP ( C-Mat)
Add Lead charges excluding CP ( C-Mat)

1 Cum
1 Cum
25%

Total per 1 Cum.

EARTH WORK EXCAVATION


1

BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead
incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
dewatering charges etc as per SS - 20 B (APSS 308).

Ordinary Soil-Manual Means-Upto 3 m depth

out put

a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour -Irrigation-Unskilled-S.No.3)
Add Labour component @
Sub total
extra for foundations @

0 day
3.64 day.
20%
75%
Sub - Total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @

337269598.xlsx data-RWHS

14%

0%

10.00

Page 2511 of 3205


Add Labour Cess @
Rate per 1 Cum excluding Dewatering

337269598.xlsx data-RWHS

0%

Page 2512 of 3205


2

BLD-CSTN-2-2(10) : Earth work excavation for foundations and depositing on bank for all lifts and with an i
operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished ite
excluding dewatering charges etc as per SS - 20 B (APSS 308).
out put

Ordinary soils-Mechcanical Means-Upto 3 m depth


a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity (R&B Hire Charges-S.No:4)

240

0 day.
8.32 day.
6.00 hours

Sub - Total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering
3

14%
0%
0%

BLD-CSTN-2-8 (16) : Supply & filling with Sand in trenches, sides of foundations and basement with initial lead in la
consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site
labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Sand Filling

6.00

Sand Filling in Foundations

a) Material
Sand (C-Mat-S.No1)

6.00 Cum

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.00 day
0.31 day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

14%
0%
0%

Rate per 1 Cum

BLD-CSTN-2-8 (16) :Supply & filling with Gravel in trenches, sides of foundations and basement with initial lead
thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to
incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Stone Dust Filling

Gravel filling

a) Material
Gravel (C-Mat-S.No5)

6.00 Cum

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.00 day
0.31 day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6
337269598.xlsx data-RWHS

14%
0%
0%

6.00

Page 2513 of 3205


Rate per 1 Cum

337269598.xlsx data-RWHS

Page 2514 of 3205


5

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundation
in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost a
site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (AP
out put

Re filling

Earth filling (ordinary soil)

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

6.00

0.00 day
0.31 day
14%
0%
0%

Rate per 1 Cum

BLD-CSTN-2-8 (16) :Supply, Filling and packing Rough / soling stone in readymade trench icluding cost and co
labour charges etc for water harvesting structure., for finished item of work. (APSS NO. 309 & 310)
out put

Rough stone filling

6.00

a) Material

Re filling

Soling stone of 150 mm size of granite, trap and Dolamite varieties

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

6.00 Cum
0.00 day
0.31 day
31%
0%
0%

Rate per 1 Cum

BLD-CSTN-2-8 (16) :Supply, Filling 65mm metal in readymade trench icluding cost and conveyance of all materia
water harvesting structure., for finished item of work. (APSS NO. 309 & 310)
out put

65mm HG MC metal filling

6.00

a) Material

Re filling

65mm HG metal

6.00 Cum

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

0.00 day
0.31 day
14%
0%
0%

Rate per 1 Cum

BLD-CSTN-2-8 (16) :Supply, Filling 40mm metal in readymade trench icluding cost and conveyance of all materia
water harvesting structure., for finished item of work. (APSS NO. 309 & 310)
out put

40mm HG metal filling


a) Material
40mm HG metal

6.00 Cum

b)Labour

ng

337269598.xlsx data-RWHS

6.00

Re filling

Page 2515 of 3205


Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6
Rate per 1 Cum

337269598.xlsx data-RWHS

0.00 day
0.31 day
31%
0%
0%

Page 2516 of 3205


9

BLD-CSTN-2-8 (16) :Supply, Filling 20mm metal in readymade trench icluding cost and conveyance of all materia
water harvesting structure., for finished item of work. (APSS NO. 309 & 310)
out put

40mm HG metal filling

6.00

a) Material

6.00 Cum

Re filling

20mm HG MC metal

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

0.00 day
0.31 day
14%
0%
0%

Rate per 1 Cum

10

BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Ce
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all mate
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concr
finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flo
Unit : 1cum
A. MATERIALS:

Cement
Coarse aggregate 40mm
Fine aggregate (Sand)
Water (including for curing)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class


Mazdoor (unskilled)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit

14%
Sub - Total

Add VAT @
Add Labour Cess @
Grand Total

0%
0%
Rate per One Cum

11

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (C
aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of
coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, con
finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:
Cement
Coarse aggregate 20mm graded (C-Mat-S.No:47)
Fine aggregate (Sand)
Water (including for curing)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Sub-Total
c.Overheads & Contractors Profit
337269598.xlsx data-RWHS

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour
0.10 day
1.39 day
14%

Page 2517 of 3205


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

0%
0%
Rate per One Cum

NOMINAL MIX ( With Wooden Scaffolding)

337269598.xlsx data-RWHS

Page 2518 of 3205


12

BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) cor
using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry includ
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage char
materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing e
of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for RC
SCAFFOLDING

RCC SLABS, BEAMS -WOODEN SCAFFOLDING


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing)
Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Total
Rate per One Cum
a

RCC M 20 perorated Slabs 100 thick


R.C.C. M 20 nominal mix Per Cum
Centering Charges for Pavement (SSR 306/L.8 )
Deduct for openings(25nos of 0.075dia for One Sqm)

0.90 cum
0.45 cum
400.00 Kgs

0.067 day
0.133 day
2.500 day

0.267 hour
0.267 hour
1.200 kl

14%
0%
0%

1.00 Cum
1.00 Cum
-0.010 Cum
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


13

BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straighten
sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicin
forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of st
such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and a
charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., com
all floors.( APSS No.126
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage -(ENCPH.Memo.No.146/Cement
& Steel
T13,
/ 2013-14)
Binding wire- SSR (Irrigation)
item /No
Pg 325
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing and placing
in position
337269598.xlsx data-RWHS

1.05 Ton
6.00 kg

Page 2519 of 3205


Blacksmith / Bar bender (Labour-Irrigation-Skilled-S.N.1)
Mazdoor (Unskilled)

10.00 day
10.00 day

(c) Labour allowance on B (included in labour rates)

(d) Contractors profit on (a+b+c)


Rate per t = a+b+c+d
Add VAT @
Add Labour Cess @
Rate per One MT
Rate per One Kg

14%

14

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mor
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materi
like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

Ground moulded size 23x11x7 Cm - (1:6)

0%
0%

A. MATERIALS:

15

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and con
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Bricks traditional size 23 x 11 x 7 cms 2nd class ( C-Mat-S.No.58)
Sand - (C-Mat-S.No:2)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Total A+B
c.Overheads & Contractors Profit
Grand Total
Rate per One Cum

0.24 day.
0.56 day.
1.89 day.

14%

A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
16

48.00 Kg
512 Nos
0.20 Cum

0.15 Cum
0.60 day
0.96 day
14%
0%
0%

BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and con
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges
where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit

0.15 Cum
0.60 day
0.96 day
14%
337269598.xlsx data-RWHS

Page 2520 of 3205


sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

0%
0%

337269598.xlsx data-RWHS

Page 2521 of 3205

AYATHI

95.00
70.00

1 Cum
1 Cum

Rs

379.00
70.00

1 Cum
1 Cum

Rs

588.00
70.00

1 Cum
1 Cum

Rs
984.00
70.00

1 Cum
1 Cum

Rs

95.00

43.86
255.35
394.21

379.00
70.00
43.86
255.35
748.21

588.00
70.00
43.86
255.35
957.21

984.00
70.00
43.86
255.35
1353.21

ts and with an initial lead of 10m including all operational,


or finished item of work including seigniorage excluding
Cum
384.00
280.00

1 day
1 day.

0.00
1019.20
203.84
1223.04
764.40
1987.44
270.59
2258.03
225.8
0.00

337269598.xlsx data-RWHS

Page 2522 of 3205


Rs

0.00
225.80

337269598.xlsx data-RWHS

Page 2523 of 3205

or all lifts and with an initial lead of 10m including all


complete for finished item of work including seigniorage
Cum
384.00
336.00
2754.50

1 day.
1 day.

0.00
2795.52

1 hours

16527.00

Rs

19322.52
2630.76
21953.28
0.00
0.00
21953.28
91.47
91.47

ement with initial lead in layers not exceeding 15 cm thick,


ance of water to work site and all operational, incidental,
309 & 310)
Cum
363.95

1 Cum

2183.70

384.00
336.00

1 day
1 day

0.00
104.16
2287.86
311.49
2599.35
0.00
0.00
2599.35
433.23
433.23

basement with initial lead in layers not exceeding 15 cm


conveyance of water to work site and all operational,
APSS NO. 309 & 310)
Cum
162.11

1 Cum

972.66

384.00
336.00

1 day
1 day

0.00
104.16
1076.82
146.61
1223.43
0.00
0.00
1223.43
203.91
337269598.xlsx data-RWHS

Page 2524 of 3205


203.91

337269598.xlsx data-RWHS

Page 2525 of 3205

ches, sides of foundations and basement with initial lead


ramming including cost and conveyance of water to work
finished item of work. (APSS NO. 309 & 310)
Cum
384.00
336.00

1 day
1 day

0.00
104.16
14.18
118.34
0.00
0.00
118.34
19.72
19.72

nch icluding cost and conveyance of all material and all


9 & 310)
Cum
394.21

1 Cum

2365.26

384.00
336.00

1 day
1 day

0.00
104.16
32.29
2501.71
0.00
0.00
2501.71
416.95
416.95

conveyance of all material and all labour charges etc for


Cum
748.21

1 Cum

4489.26

384.00
336.00

1 day
1 day

0.00
104.16
14.18
4607.60
0.00
0.00
4607.60
767.93
767.93

conveyance of all material and all labour charges etc for


Cum
957.21

1 Cum

5743.26

337269598.xlsx data-RWHS

Page 2526 of 3205


384.00
336.00

1 day
1 day

0.00
104.16
32.29
5879.71
0.00
0.00
5879.71
979.95
979.95

337269598.xlsx data-RWHS

Page 2527 of 3205

conveyance of all material and all labour charges etc for


Cum
1353.21

1 Cum

8119.26

384.00
336.00

1 day
1 day

0.00
104.16
14.18
8237.60
0.00
0.00
8237.60
1372.93
1372.93

inal mix (1:4:8) prop (Cement : fine aggregate: coarse


conveyance of all materials like cement, sand, coarse
for mixing , laying, concrete , ramming in 15 cm layers,
foundation and under flooring bed.

Err:520
1104.21
1332.37
100.00

1 Kg
1 Cum
1 Cum
1 Kl

891.00
993.79
599.57
120.00

420.00
336.00

1 day
1 day

42.00
792.96
3439.32
468.26
3907.58
0.00
0.00
3907.58
3907.58

Rs

Rs

rete nominal mix m-20 (Cement : fine aggregate: coarse


cost and conveyance of all materials like cement, sand,
s , for mixing , laying, concrete , ramming in 15 cm layers,
h nomonal reinforcement

5.50
1449.21
1332.37
100.00
303.10

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1815.00
1304.29
599.57
120.00
303.10

420.00
336.00

1 day
1 day

42.00
467.04
4651.00
633.23

Rs

337269598.xlsx data-RWHS

Page 2528 of 3205

Rs

5284.23
0.00
0.00
5284.23
5284.23

337269598.xlsx data-RWHS

Page 2529 of 3205

te: coarse aggregate) corresponding to Table 9 of IS 456


approved quarry including cost and conveyance of all
cluding Seigniorage charges, sales & other taxes on all
, laying concrete, curing etc.,complete but excluding cost
shuttering charges for RCC SLABS, BEAMS -WOODEN

1854.81
791.93
5.74

1 cum
1 cum
1 Kgs

1669.33
356.37
2296.00
4321.70

504.00
450.00
384.00

1 day
1 day
1 day

33.77
59.85
960.00
1053.62

338.60
175.40
103.00

1 hour
1 hour
1 kl

90.41
46.83
123.60
260.84
5636.16
767.36
6403.52
0
0
6403.52
6403.55

Rs

5636.16
160.00
5636.16

1 Cum
1 Cum
1 Cum
Rs

Rs

5636.16
160.00
-56.36
5739.80
781.47
6521.27
0
0
6521.27
6521.30

cally Treated (TMT) / Mild steel (MS) steel bars (Fe 415/
ur charges for straightening, cutting, bending to required
and tying and lap-splicing with binding wire of 18 SWG,
ost and conveyance of steel bars, including all wastages
g wire, cover blocks and all incidental, operational, labour
on all materials etc., complete for finished item of work in

43000.00
70.00

1 Ton
1 kg

45150.00
420.00

337269598.xlsx data-RWHS

Page 2530 of 3205


444.00
384.00

1 day
1 day

4440.00
3840.00

1 MT

Sub Total:
Rs.

7539.00
61389.00
0.00
0.00
61389.00
61.39

11x7 Cm in Cement Mortor 1:6 Prop including Cost &


age charges on all materials, including all labour charges
or finished item of work

5.74
3914.54
791.93

504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum

275.52
2004.24
158.39
2438.15

1 day.
1 day.
1 day.
Rs

Rs

120.96
252.00
725.76
1098.72
3536.87
481.54
4018.41
4018.41

th including cost and conveyance of all materials to site,


ncidental, labour charges etc., including cutting grooves
m.( only for Ceiling)

3962.19

1 Cum

594.33

504.00
384.00

1 day
1 day

302.40
368.64
1265.37
172.28
1437.65
0.00
0.00
1437.65

Rs

Rs

th including cost and conveyance of all materials to site,


ncidental, labour charges etc., including cutting grooves
m.

3338.19

1 Cum

500.73

504.00
384.00

1 day
1 day

302.40
368.64
1171.77
159.54
337269598.xlsx data-RWHS

Page 2531 of 3205

Rs

1331.31
0.00
0.00
1331.31

337269598.xlsx data-RWHS

Width at Bund Top


Level

Side slope / 1m
Depth

Vertical Length

Length of Sloped
portion for Lining

Width of Bund at
Top L/W

Width of Bund at
Bottom L/W

Average

Width of Bund at
Top S/W

Width of Bund at
Bottom S/W

Average

6.500

7.27

5.00

16.08

10.540

5.00

16.08

10.540

202.50

212.50 207.80

217.80

3.90

2.00

3.900

4.37

5.00

10.26

7.628

5.00

10.256

7.628

100.00

200.40

100.40 207.80

107.80

3.90

2.00

3.900

4.37

3.00

10.40

6.702

5.00

12.404

8.702

100.00

202.00

102.00 207.80

107.80

3.90

2.00

3.900

4.37

5.00

10.77

7.886

5.00

10.772

7.886

106.00

30.00

106.00

119.00

43.00

6.50

2.00

6.500

7.27

5.00

18.00

11.500

5.00

18

11.500

167.95

200.00

210.00

199.50

209.50 207.80

217.80

3.90

2.00

3.900

4.37

5.00

13.28

9.140

5.00

13.28

9.140

3.08

167.45

200.00

100.00

201.60

101.60 207.80

107.80

3.90

2.00

3.900

4.37

3.00

9.17

6.084

5.00

11.168

8.084

2.68

167.20

200.00

100.00

202.40

102.40 207.80

107.80

3.90

2.00

3.900

4.37

5.00

10.36

7.680

5.00

10.36

7.680

0.75

3.25

2.77

5.54

172.75

106.00

30.00

107.90

Facultative Pond

169.14

168.50

0.64

169.70

1.20

0.75

1.95

1.31

2.63

170.45

200.00

210.00

Maturation Pond

166.85

166.75

0.10

167.95

1.20

0.75

1.95

1.85

3.70

168.70

200.00

Maturation Pond -2

166.76

166.25

0.51

167.45

1.20

0.75

1.95

1.44

2.89

168.20

200.00

Anerobic Pond

167.00

167.00

0.00

169.50

2.50

0.75

3.25

3.25

6.50

170.25

Facultative Pond

165.88

166.00

-0.12

167.20

1.20

0.75

1.95

2.07

4.14

Maturation Pond

165.91

165.50

0.41

166.70

1.20

0.75

1.95

1.54

Maturation Pond -2

165.86

165.25

0.61

166.45

1.20

0.75

1.95

1.34

Length at GL

2.50

Width at Bed

172.00

Total Depth

0.48

Free Board

169.50

Liquid Depth

169.98

Description
Anerobic Pond

Width at GL

2.00

Length at Bed

6.50

Pro,Top Level

Length at Bund
Level

Outer slope of Bund

Height of Bund

Pro. Water Level

43.00

Pro. Bed Level

119.00

Av.GL

Depth of Cutting

DETAILS OF STPs UNDER NALGONDA UNDER GROUND DRAINAGE SCHEME

STP - I
31.90

STP - II
30.00

Manufacture,supply and delivery of PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES cofirming to IS 784/2001 Ex-factory including transportation, ta
Cement req'd vide - Pg.5 of IS 784
for Pipe
for Mortar

S.N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Dia of Pipe

PSC Pipes
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

2*
6.286

350 Kg
500 Kg

inner Dia
Barral Thick
of Pipe in ness in MtsMts
IS 784-Pg.3

Cement
mortar
coating in
Mts

Non Cylindrical
0.35
0.40
0.45
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00

0.035
0.035
0.035
0.035
0.040
0.040
0.045
0.055
0.060
0.065
0.070
0.075
0.075
0.080
0.085
0.090
0.095
0.100
0.105

Radius of Pipe
in Mts.

6 Kg/Cm2
0.190
0.022
0.220
0.022
0.240
0.022
0.270
0.022
0.320
0.022
0.370
0.022
0.420
0.022
0.480
0.022
0.530
0.022
0.580
0.022
0.640
0.022
0.690
0.022
0.740
0.022
0.790
0.022
0.840
0.022
0.900
0.022
0.950
0.022
1.000
0.022
1.050
0.022

Radius of
CM in Mts.

Circumferen Volume of Volume of


ce of the
RCC per 1 CM per 1
pipe
Rmt
Rmt

Requir't of Steel in Mts. per 1


Rmt
Total 4mm steel
req'd Kg/ 1 Rmt
Longitudinal Circumferential

Wh
0.200
0.230
0.250
0.280
0.330
0.380
0.430
0.490
0.540
0.590
0.650
0.700
0.750
0.800
0.850
0.910
0.960
1.010
1.060

1.190
1.380
1.510
1.700
2.010
2.330
2.640
3.020
3.330
3.650
4.020
4.340
4.650
4.970
5.280
5.660
5.970
6.290
6.600

0.040
0.050
0.050
0.060
0.080
0.090
0.120
0.170
0.200
0.240
0.280
0.330
0.350
0.400
0.450
0.510
0.570
0.630
0.690

0.028
0.032
0.035
0.039
0.046
0.053
0.059
0.068
0.075
0.082
0.090
0.097
0.104
0.111
0.118
0.126
0.133
0.140
0.147

9.00
10.00
11.00
12.00
14.00
17.00
19.00
21.00
23.00
25.00
28.00
30.00
32.00
34.00
36.00
39.00
41.00
43.00
45.00

74.38
86.25
94.38
106.25
125.63
145.63
165.00
188.75
208.13
228.13
251.25
271.25
290.63
310.63
330.00
353.75
373.13
393.13
412.50

8.25
9.52
10.42
11.69
13.81
16.08
18.20
20.74
22.86
25.03
27.62
29.79
31.91
34.08
36.20
38.84
40.96
43.13
45.25

PSC Pipes

S.N

Dia of Pipe

Non Cylindrical
inner Dia
Barral Thick
of Pipe in ness in MtsMts
IS 784-Pg.3

8 Kg/Cm2

Cement
mortar
coating in
Mts

Radius of Pipe
in Mts.

Radius of
CM in Mts.

Circumferen Volume of Volume of


ce of the
RCC per 1 CM per 1
pipe
Rmt
Rmt

Requir't of Steel in Mts. per 1


Rmt

Total 4mm steel


req'd Kg/ 1 Rmt

Longitudinal Circumferential

Wh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

0.35
0.40
0.45
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00

0.035
0.035
0.035
0.035
0.040
0.040
0.045
0.055
0.060
0.065
0.070
0.075
0.075
0.080
0.085
0.090
0.095
0.100
0.105

0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022

0.190
0.220
0.240
0.270
0.320
0.370
0.420
0.480
0.530
0.580
0.640
0.690
0.740
0.790
0.840
0.900
0.950
1.000
1.050

0.200
0.230
0.250
0.280
0.330
0.380
0.430
0.490
0.540
0.590
0.650
0.700
0.750
0.800
0.850
0.910
0.960
1.010
1.060

1.190
1.380
1.510
1.700
2.010
2.330
2.640
3.020
3.330
3.650
4.020
4.340
4.650
4.970
5.280
5.660
5.970
6.290
6.600

0.040
0.050
0.050
0.060
0.080
0.090
0.120
0.170
0.200
0.240
0.280
0.330
0.350
0.400
0.450
0.510
0.570
0.630
0.690

0.028
0.032
0.035
0.039
0.046
0.053
0.059
0.068
0.075
0.082
0.090
0.097
0.104
0.111
0.118
0.126
0.133
0.140
0.147

9.00
10.00
11.00
12.00
14.00
17.00
19.00
21.00
23.00
25.00
28.00
30.00
32.00
34.00
36.00
39.00
41.00
43.00
45.00

74.38
86.25
94.38
106.25
125.63
145.63
165.00
188.75
208.13
228.13
251.25
271.25
290.63
310.63
330.00
353.75
373.13
393.13
412.50

8.25
9.52
10.42
11.69
13.81
16.08
18.20
20.74
22.86
25.03
27.62
29.79
31.91
34.08
36.20
38.84
40.96
43.13
45.25

PSC Pipes

S.N

Dia of Pipe

Non Cylindrical
inner Dia
Barral Thick
of Pipe in ness in MtsMts
IS 784-Pg.3

10 Kg/Cm2

Cement
mortar
coating in
Mts

Radius of Pipe
in Mts.

Radius of
CM in Mts.

Circumferen Volume of Volume of


ce of the
RCC per 1 CM per 1
pipe
Rmt
Rmt

Requir't of Steel in Mts. per 1


Rmt

Total 4mm steel


req'd Kg/ 1 Rmt

Longitudinal Circumferential

Wh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

0.35
0.40
0.45
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00

0.035
0.035
0.035
0.035
0.040
0.040
0.045
0.055
0.060
0.065
0.070
0.075
0.075
0.080
0.085
0.090
0.095
0.100
0.105

0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022

0.190
0.220
0.240
0.270
0.320
0.370
0.420
0.480
0.530
0.580
0.640
0.690
0.740
0.790
0.840
0.900
0.950
1.000
1.050

0.200
0.230
0.250
0.280
0.330
0.380
0.430
0.490
0.540
0.590
0.650
0.700
0.750
0.800
0.850
0.910
0.960
1.010
1.060

1.190
1.380
1.510
1.700
2.010
2.330
2.640
3.020
3.330
3.650
4.020
4.340
4.650
4.970
5.280
5.660
5.970
6.290
6.600

0.040
0.050
0.050
0.060
0.080
0.090
0.120
0.170
0.200
0.240
0.280
0.330
0.350
0.400
0.450
0.510
0.570
0.630
0.690

0.028
0.032
0.035
0.039
0.046
0.053
0.059
0.068
0.075
0.082
0.090
0.097
0.104
0.111
0.118
0.126
0.133
0.140
0.147

9.00
10.00
11.00
12.00
14.00
17.00
19.00
21.00
23.00
25.00
28.00
30.00
32.00
34.00
36.00
39.00
41.00
43.00
45.00

74.38
86.25
94.38
106.25
125.63
145.63
165.00
188.75
208.13
228.13
251.25
271.25
290.63
310.63
330.00
353.75
373.13
393.13
412.50

8.25
9.52
10.42
11.69
13.81
16.08
18.20
20.74
22.86
25.03
27.62
29.79
31.91
34.08
36.20
38.84
40.96
43.13
45.25

PSC Pipes

S.N

Dia of Pipe

Non Cylindrical
inner Dia
Barral Thick
of Pipe in ness in MtsMts
IS 784-Pg.3

12 Kg/Cm2

Cement
mortar
coating in
Mts

Radius of Pipe
in Mts.

Radius of
CM in Mts.

Circumferen Volume of Volume of


ce of the
RCC per 1 CM per 1
pipe
Rmt
Rmt

Requir't of Steel in Mts. per 1


Rmt

Total 4mm steel


req'd Kg/ 1 Rmt

Longitudinal Circumferential

Wh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

0.35
0.40
0.45
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00

0.035
0.035
0.035
0.035
0.040
0.040
0.045
0.055
0.060
0.065
0.070
0.075
0.075
0.080
0.085
0.090
0.095
0.100
0.105

0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022

0.190
0.220
0.240
0.270
0.320
0.370
0.420
0.480
0.530
0.580
0.640
0.690
0.740
0.790
0.840
0.900
0.950
1.000
1.050

0.200
0.230
0.250
0.280
0.330
0.380
0.430
0.490
0.540
0.590
0.650
0.700
0.750
0.800
0.850
0.910
0.960
1.010
1.060

1.190
1.380
1.510
1.700
2.010
2.330
2.640
3.020
3.330
3.650
4.020
4.340
4.650
4.970
5.280
5.660
5.970
6.290
6.600

0.040
0.050
0.050
0.060
0.080
0.090
0.120
0.170
0.200
0.240
0.280
0.330
0.350
0.400
0.450
0.510
0.570
0.630
0.690

0.028
0.032
0.035
0.039
0.046
0.053
0.059
0.068
0.075
0.082
0.090
0.097
0.104
0.111
0.118
0.126
0.133
0.140
0.147

9.00
10.00
11.00
12.00
14.00
17.00
19.00
21.00
23.00
25.00
28.00
30.00
32.00
34.00
36.00
39.00
41.00
43.00
45.00

74.38
86.25
94.38
106.25
125.63
145.63
165.00
188.75
208.13
228.13
251.25
271.25
290.63
310.63
330.00
353.75
373.13
393.13
412.50

8.25
9.52
10.42
11.69
13.81
16.08
18.20
20.74
22.86
25.03
27.62
29.79
31.91
34.08
36.20
38.84
40.96
43.13
45.25

PSC Pipes

S.N

Dia of Pipe

Non Cylindrical

inner Dia
Barral Thick
of Pipe in ness in MtsMts
IS 784-Pg.3

14 Kg/Cm2

Cement
mortar
coating in
Mts

Radius of Pipe
in Mts.

Radius of
CM in Mts.

Circumferen Volume of Volume of


ce of the
RCC per 1 CM per 1
pipe
Rmt
Rmt

Requir't of Steel in Mts. per 1


Rmt

Total 4mm steel


req'd Kg/ 1 Rmt

Longitudinal Circumferential

Wh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

0.35
0.40
0.45
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00

0.035
0.035
0.035
0.035
0.040
0.040
0.045
0.055
0.060
0.065
0.070
0.075
0.075
0.080
0.085
0.090
0.095
0.100
0.105

0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022

0.190
0.220
0.240
0.270
0.320
0.370
0.420
0.480
0.530
0.580
0.640
0.690
0.740
0.790
0.840
0.900
0.950
1.000
1.050

0.200
0.230
0.250
0.280
0.330
0.380
0.430
0.490
0.540
0.590
0.650
0.700
0.750
0.800
0.850
0.910
0.960
1.010
1.060

1.190
1.380
1.510
1.700
2.010
2.330
2.640
3.020
3.330
3.650
4.020
4.340
4.650
4.970
5.280
5.660
5.970
6.290
6.600

0.040
0.050
0.050
0.060
0.080
0.090
0.120
0.170
0.200
0.240
0.280
0.330
0.350
0.400
0.450
0.510
0.570
0.630
0.690

0.028
0.032
0.035
0.039
0.046
0.053
0.059
0.068
0.075
0.082
0.090
0.097
0.104
0.111
0.118
0.126
0.133
0.140
0.147

9.00
10.00
11.00
12.00
14.00
17.00
19.00
21.00
23.00
25.00
28.00
30.00
32.00
34.00
36.00
39.00
41.00
43.00
45.00

74.38
86.25
94.38
106.25
125.63
145.63
165.00
188.75
208.13
228.13
251.25
271.25
290.63
310.63
330.00
353.75
373.13
393.13
412.50

8.25
9.52
10.42
11.69
13.81
16.08
18.20
20.74
22.86
25.03
27.62
29.79
31.91
34.08
36.20
38.84
40.96
43.13
45.25

PSC Pipes

S.N

Dia of Pipe

Non Cylindrical
inner Dia
Barral Thick
of Pipe in ness in MtsMts
IS 784-Pg.3

16 Kg/Cm2

Cement
mortar
coating in
Mts

Radius of Pipe
in Mts.

Radius of
CM in Mts.

Circumferen Volume of Volume of


ce of the
RCC per 1 CM per 1
pipe
Rmt
Rmt

Requir't of Steel in Mts. per 1


Rmt

Total 4mm steel


req'd Kg/ 1 Rmt

Longitudinal Circumferential

Wh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

0.35
0.40
0.45
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00

0.035
0.035
0.035
0.035
0.040
0.040
0.045
0.055
0.060
0.065
0.070
0.075
0.075
0.080
0.085
0.090
0.095
0.100
0.105

0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022
0.022

0.190
0.220
0.240
0.270
0.320
0.370
0.420
0.480
0.530
0.580
0.640
0.690
0.740
0.790
0.840
0.900
0.950
1.000
1.050

0.200
0.230
0.250
0.280
0.330
0.380
0.430
0.490
0.540
0.590
0.650
0.700
0.750
0.800
0.850
0.910
0.960
1.010
1.060

1.190
1.380
1.510
1.700
2.010
2.330
2.640
3.020
3.330
3.650
4.020
4.340
4.650
4.970
5.280
5.660
5.970
6.290
6.600

0.040
0.050
0.050
0.060
0.080
0.090
0.120
0.170
0.200
0.240
0.280
0.330
0.350
0.400
0.450
0.510
0.570
0.630
0.690

0.028
0.032
0.035
0.039
0.046
0.053
0.059
0.068
0.075
0.082
0.090
0.097
0.104
0.111
0.118
0.126
0.133
0.140
0.147

9.00
10.00
11.00
12.00
14.00
17.00
19.00
21.00
23.00
25.00
28.00
30.00
32.00
34.00
36.00
39.00
41.00
43.00
45.00

74.38
86.25
94.38
106.25
125.63
145.63
165.00
188.75
208.13
228.13
251.25
271.25
290.63
310.63
330.00
353.75
373.13
393.13
412.50

8.25
9.52
10.42
11.69
13.81
16.08
18.20
20.74
22.86
25.03
27.62
29.79
31.91
34.08
36.20
38.84
40.96
43.13
45.25

ETE PIPES cofirming to IS 784/2001 Ex-factory including transportation, taxes & duties.

Requir't of Cement in
Kgs per 1 Rmt
for pipe

14.00
17.50
17.50
21.00
28.00
31.50
42.00
59.50
70.00
84.00
98.00
115.50
122.50
140.00
157.50
178.50
199.50
220.50
241.50

Total Cement
req'd Kg / 1 Rmt

for coating

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Wc
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Requir't of Cement in
Kgs per 1 Rmt
for pipe

14.000
17.500
17.500
21.000
28.000
31.500
42.000
59.500
70.000
84.000
98.000
115.500
122.500
140.000
157.500
178.500
199.500
220.500
241.500

Total Cement
req'd Kg / 1 Rmt

for coating

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Wc
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Requir't of Cement in
Kgs per 1 Rmt
for pipe

14.000
17.500
17.500
21.000
28.000
31.500
42.000
59.500
70.000
84.000
98.000
115.500
122.500
140.000
157.500
178.500
199.500
220.500
241.500

Total Cement
req'd Kg / 1 Rmt

for coating

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Wc
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Requir't of Cement in
Kgs per 1 Rmt
for pipe

14.000
17.500
17.500
21.000
28.000
31.500
42.000
59.500
70.000
84.000
98.000
115.500
122.500
140.000
157.500
178.500
199.500
220.500
241.500

Total Cement
req'd Kg / 1 Rmt

for coating

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Wc
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Requir't of Cement in
Kgs per 1 Rmt
for pipe

14.000
17.500
17.500
21.000
28.000
31.500
42.000
59.500
70.000
84.000
98.000
115.500
122.500
140.000
157.500
178.500
199.500
220.500
241.500

Total Cement
req'd Kg / 1 Rmt

for coating

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Wc
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Requir't of Cement in
Kgs per 1 Rmt
for pipe

14.000
17.500
17.500
21.000
28.000
31.500
42.000
59.500
70.000
84.000
98.000
115.500
122.500
140.000
157.500
178.500
199.500
220.500
241.500

Total Cement
req'd Kg / 1 Rmt

for coating

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Wc
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Manufacture,supply and delivery of PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES cofirming to IS 784/2001 Ex-factory including transportation, t
Market
Cement Rate as per

S.N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

SSR

2014-15
Variation per Kg

5740.00

Market
MS rods Rate as per SSR

4000.00
1.74

Basic Rate of

Variation in

Variation in
Steel Cost

Deduct ST
on HT wire

P1
2624.00
2823.00
3023.00
3271.00
3762.00
4610.00
5442.00
6312.00
7410.00
8416.00
9346.00
10599.00
12081.00
14074.00
15842.00
16679.00
18044.00
19267.00
21188.00

R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

R1
-63.94
-73.78
-80.76
-90.60
-107.03
-124.62
-141.05
-160.74
-177.17
-193.98
-214.06
-230.87
-247.30
-264.12
-280.55
-301.01
-317.44
-334.26
-350.69

-20.33
-23.46
-25.68
-28.81
-34.03
-39.63
-44.85
-51.11
-56.33
-61.68
-68.06
-73.41
-78.64
-83.98
-89.21
-95.71
-100.94
-106.28
-111.51

Dia of Pipe Pipe per Rmt Cement Cost


6 Kg/Cm2
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

11/1/2015

11/1/2015

2014-15
Variation per Kg

Actual Rate of
Pipe per Rmt

P1+R1+R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Rate per 1
Km Lead

1.30
1.30
1.60
1.70
1.90
3.10
3.10
3.10
5.00
5.00
9.60
9.70
9.70
9.70
10.90
10.90
11.10
11.60
11.60

Total lead
charges

130.00
130.00
160.00
170.00
190.00
310.00
310.00
310.00
500.00
500.00
960.00
970.00
970.00
970.00
1090.00
1090.00
1110.00
1160.00
1160.00

Add over
heads on
pipe

13.62%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

CED @

12.50%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

51750
59500
-7.750

Add ST @

5.00%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Total Cost of
Pipe

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

PSC Non Cylindrical

S.N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

8 Kg/Cm2

Dia of Pipe Pipe per Rmt Cement Cost

Basic Rate of

Variation in

Variation in
Steel Cost

Deduct ST
on HT wire

P1
2632.00
2844.00
3037.00
3285.00
3791.00
4630.00
5497.00
6360.00
7473.00
8535.00
9501.00
11178.00
12751.00
14865.00
16744.00
17337.00
19171.00
20309.00
22484.00

R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

R1
-63.94
-73.78
-80.76
-90.60
-107.03
-124.62
-141.05
-160.74
-177.17
-193.98
-214.06
-230.87
-247.30
-264.12
-280.55
-301.01
-317.44
-334.26
-350.69

-20.33
-23.46
-25.68
-28.81
-34.03
-39.63
-44.85
-51.11
-56.33
-61.68
-68.06
-73.41
-78.64
-83.98
-89.21
-95.71
-100.94
-106.28
-111.51

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

Actual Rate of
Pipe per Rmt

P1+R1+R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Rate per 1
Km Lead

1.30
1.30
1.60
1.70
1.90
3.10
3.10
3.10
5.00
5.00
9.60
9.70
9.70
9.70
10.90
10.90
11.10
11.60
11.60

Total lead
charges

130.00
130.00
160.00
170.00
190.00
310.00
310.00
310.00
500.00
500.00
960.00
970.00
970.00
970.00
1090.00
1090.00
1110.00
1160.00
1160.00

Add over
heads on
pipe

13.62%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

CED @

12.50%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Add ST @

5.00%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Total Cost of
Pipe

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

PSC Non Cylindrical

S.N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

10 Kg/Cm2

Dia of Pipe Pipe per Rmt Cement Cost

Basic Rate of

Variation in

Variation in
Steel Cost

Deduct ST
on HT wire

P1
2646.00
2876.00
3071.00
3312.00
3829.00
4703.00
5635.00
6501.00
7681.00
8769.00
9983.00
11770.00
13450.00
15655.00
17646.00
18230.00
20209.00
22080.00
23658.00

R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

R1
-63.94
-73.78
-80.76
-90.60
-107.03
-124.62
-141.05
-160.74
-177.17
-193.98
-214.06
-230.87
-247.30
-264.12
-280.55
-301.01
-317.44
-334.26
-350.69

-20.33
-23.46
-25.68
-28.81
-34.03
-39.63
-44.85
-51.11
-56.33
-61.68
-68.06
-73.41
-78.64
-83.98
-89.21
-95.71
-100.94
-106.28
-111.51

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

Actual Rate of
Pipe per Rmt

P1+R1+R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Rate per 1
Km Lead

1.30
1.30
1.60
1.70
1.90
3.10
3.10
3.10
5.00
5.00
9.60
9.70
9.70
9.70
10.90
10.90
11.10
11.60
11.60

Total lead
charges

130.00
130.00
160.00
170.00
190.00
310.00
310.00
310.00
500.00
500.00
960.00
970.00
970.00
970.00
1090.00
1090.00
1110.00
1160.00
1160.00

Add over
heads on
pipe

13.62%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

CED @

12.50%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Add ST @

5.00%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Total Cost of
Pipe

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

PSC Non Cylindrical

S.N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

12 Kg/Cm2

Dia of Pipe Pipe per Rmt Cement Cost

Basic Rate of

Variation in

Variation in
Steel Cost

Deduct ST
on HT wire

P1
2659.00
2914.00
3131.00
3383.00
3947.00
4813.00
5767.00
6767.00
7980.00
9236.00
10430.00
12370.00
14569.00
16940.00
19921.00
20441.00
22164.00
23326.00
25942.00

R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

R1
-63.94
-73.78
-80.76
-90.60
-107.03
-124.62
-141.05
-160.74
-177.17
-193.98
-214.06
-230.87
-247.30
-264.12
-280.55
-301.01
-317.44
-334.26
-350.69

-20.33
-23.46
-25.68
-28.81
-34.03
-39.63
-44.85
-51.11
-56.33
-61.68
-68.06
-73.41
-78.64
-83.98
-89.21
-95.71
-100.94
-106.28
-111.51

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

Actual Rate of
Pipe per Rmt

P1+R1+R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Rate per 1
Km Lead

1.30
1.30
1.60
1.70
1.90
3.10
3.10
3.10
5.00
5.00
9.60
9.70
9.70
9.70
10.90
10.90
11.10
11.60
11.60

Total lead
charges

130.00
130.00
160.00
170.00
190.00
310.00
310.00
310.00
500.00
500.00
960.00
970.00
970.00
970.00
1090.00
1090.00
1110.00
1160.00
1160.00

Add over
heads on
pipe

13.62%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

CED @

12.50%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Add ST @

5.00%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Total Cost of
Pipe

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

PSC Non Cylindrical

S.N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

14 Kg/Cm2

Dia of Pipe Pipe per Rmt Cement Cost

Basic Rate of

Variation in

Variation in
Steel Cost

Deduct ST
on HT wire

P1
2712.00
2967.00
3210.00
3452.00
4071.00
4980.00
5994.00
7025.00
8349.00
9632.00
11070.00
13400.00
15729.00
18235.00
20628.00
22595.00
24490.00
25323.00
29469.00

R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

R1
-63.94
-73.78
-80.76
-90.60
-107.03
-124.62
-141.05
-160.74
-177.17
-193.98
-214.06
-230.87
-247.30
-264.12
-280.55
-301.01
-317.44
-334.26
-350.69

-20.33
-23.46
-25.68
-28.81
-34.03
-39.63
-44.85
-51.11
-56.33
-61.68
-68.06
-73.41
-78.64
-83.98
-89.21
-95.71
-100.94
-106.28
-111.51

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

Actual Rate of
Pipe per Rmt

P1+R1+R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Rate per 1
Km Lead

1.30
1.30
1.60
1.70
1.90
3.10
3.10
3.10
5.00
5.00
9.60
9.70
9.70
9.70
10.90
10.90
11.10
11.60
11.60

Total lead
charges

130.00
130.00
160.00
170.00
190.00
310.00
310.00
310.00
500.00
500.00
960.00
970.00
970.00
970.00
1090.00
1090.00
1110.00
1160.00
1160.00

Add over
heads on
pipe

13.62%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

CED @

12.50%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Add ST @

5.00%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Total Cost of
Pipe

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

PSC Non Cylindrical

S.N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

16 Kg/Cm2

Dia of Pipe Pipe per Rmt Cement Cost

Basic Rate of

Variation in

Variation in
Steel Cost

Deduct ST
on HT wire

Actual Rate of
Pipe per Rmt

P1
2805.00
3011.00
3278.00
3553.00
4193.00
5119.00
6202.00
7493.00
8778.00
10078.00
11882.00
14589.00
16552.00
19170.00
21686.00
23854.00
25855.00
28348.00
31774.00

R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

R1
-63.94
-73.78
-80.76
-90.60
-107.03
-124.62
-141.05
-160.74
-177.17
-193.98
-214.06
-230.87
-247.30
-264.12
-280.55
-301.01
-317.44
-334.26
-350.69

-20.33
-23.46
-25.68
-28.81
-34.03
-39.63
-44.85
-51.11
-56.33
-61.68
-68.06
-73.41
-78.64
-83.98
-89.21
-95.71
-100.94
-106.28
-111.51

P1+R1+R2
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1300 mm
1400 mm
1500 mm
1600 mm
1700 mm
1800 mm
1900 mm
2000 mm

Rate per 1
Km Lead

1.30
1.30
1.60
1.70
1.90
3.10
3.10
3.10
5.00
5.00
9.60
9.70
9.70
9.70
10.90
10.90
11.10
11.60
11.60

Total lead
charges

130.00
130.00
160.00
170.00
190.00
310.00
310.00
310.00
500.00
500.00
960.00
970.00
970.00
970.00
1090.00
1090.00
1110.00
1160.00
1160.00

Add over
heads on
pipe

13.62%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

CED @

12.50%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Add ST @

5.00%
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Total Cost of
Pipe

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

ETE PIPES cofirming to IS 784/2001 Ex-factory including transportation, taxes & duties.
Lead
M.A

Laying &
Jointing
charges

213.00
230.00
266.00
283.00
348.00
408.00
462.00
506.00
584.00
656.00
727.00
824.00
932.00
1011.00
1133.00
1233.00
1305.00
1378.00
1450.00

100 Km
20%

Total Laying Rate including


charges with Lowering and
MA
Laying

255.60
276.00
319.20
339.60
417.60
489.60
554.40
607.20
700.80
787.20
872.40
988.80
1118.40
1213.20
1359.60
1479.60
1566.00
1653.60
1740.00

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Laying &
Jointing
charges

213.00
230.00
266.00
283.00
348.00
408.00
462.00
506.00
584.00
656.00
727.00
824.00
932.00
1011.00
1133.00
1233.00
1305.00
1378.00
1450.00

Total Laying Rate including


charges with Lowering and
MA
Laying

255.60
276.00
319.20
339.60
417.60
489.60
554.40
607.20
700.80
787.20
872.40
988.80
1118.40
1213.20
1359.60
1479.60
1566.00
1653.60
1740.00

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Laying &
Jointing
charges

213.00
230.00
266.00
283.00
348.00
408.00
462.00
506.00
584.00
656.00
727.00
824.00
932.00
1011.00
1133.00
1233.00
1305.00
1378.00
1450.00

Total Laying Rate including


charges with Lowering and
MA
Laying

255.60
276.00
319.20
339.60
417.60
489.60
554.40
607.20
700.80
787.20
872.40
988.80
1118.40
1213.20
1359.60
1479.60
1566.00
1653.60
1740.00

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Laying &
Jointing
charges

213.00
230.00
266.00
283.00
348.00
408.00
462.00
506.00
584.00
656.00
727.00
824.00
932.00
1011.00
1133.00
1233.00
1305.00
1378.00
1450.00

Total Laying Rate including


charges with Lowering and
MA
Laying

255.60
276.00
319.20
339.60
417.60
489.60
554.40
607.20
700.80
787.20
872.40
988.80
1118.40
1213.20
1359.60
1479.60
1566.00
1653.60
1740.00

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Laying &
Jointing
charges

213.00
230.00
266.00
283.00
348.00
408.00
462.00
506.00
584.00
656.00
727.00
824.00
932.00
1011.00
1133.00
1233.00
1305.00
1378.00
1450.00

Total Laying Rate including


charges with Lowering and
MA
Laying

255.60
276.00
319.20
339.60
417.60
489.60
554.40
607.20
700.80
787.20
872.40
988.80
1118.40
1213.20
1359.60
1479.60
1566.00
1653.60
1740.00

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

Laying &
Jointing
charges

213.00
230.00
266.00
283.00
348.00
408.00
462.00
506.00
584.00
656.00
727.00
824.00
932.00
1011.00
1133.00
1233.00
1305.00
1378.00
1450.00

Total Laying Rate including


charges with Lowering and
MA
Laying

255.60
276.00
319.20
339.60
417.60
489.60
554.40
607.20
700.80
787.20
872.40
988.80
1118.40
1213.20
1359.60
1479.60
1566.00
1653.60
1740.00

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

DATA FOR BWSC PIPES


Working Pressure

0.7846 N/sq.mm

or

7.846 Kg/sq.cm

Site Test Pressure

1.1769 N/sq.mm

or

11.769 Kg/sq.cm

1.41228 N/sq.mm

or

14.1228 Kg/sq.cm

Pipe Dia in mm

Wall thickness t

Cement Mortar lining


ti

Cement Mortar
coating

Cylinder thickness

thickness of joint
rings

Internal Dia of steel


cylinder

Outside Dia of steel


cylinder

Cylinder Steel Area


in sq.mm/m

Total Steel Area


(Factory Test
Pressure) in
sq.mm/m

Total Steel Area Site


Test Pressure) in
sq.mm/m

Total Steel Area


Working Test
Pressure) in
sq.mm/m

Area of bar / wire


reinforcement

Min. area of bar /


wire reinforcement

Factory Test Pressure

250
300
350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600

40
40
40
40
40
45
45
45
45
45
45
50
50
50
50
50
50

15
15
15
15
15
20
20
20
20
20
20
22
22
22
22
22
22

23.4
23.4
23.4
23.4
23.4
23.4
23.0
23.0
23.0
22.5
22.5
24.0
24.0
24.0
24.0
24.0
24.0

1.6
1.6
1.6
1.6
1.6
1.6
2.0
2.0
2.0
2.5
2.5
4.0
4.0
4.0
4.0
4.0
4.0

5
5
5
5
5
5
5
5
5
5
7
7
7
8
8
8
8

280
330
380
430
480
540
640
740
840
940
1040
1144
1244
1344
1444
1544
1644

283.2
333.2
383.2
433.2
483.2
543.2
644
744
844
945
1045
1152
1252
1352
1452
1552
1652

400
480
560
640
720
800
1200
1400
1600
2250
2500
4400
4800
5200
5600
6000
6400

1057
1246
1435
1624
1813
2039
2417
2794
3172
3550
3927
4320
4698
5075
5453
5830
6208

999
1177
1355
1534
1712
1926
2282
2639
2996
3352
3709
4080
4437
4793
5150
5506
5863

879
1036
1193
1350
1506
1695
2009
2322
2636
2950
3264
3590
3904
4218
4532
4846
5160

657
766
875
984
1093
1239
1217
1394
1572
1300
1427
-80
-102
-125
-147
-170
-192

207.5
249.0
290.5
332.0
373.5
415.0
498.0
581.0
664.0
747.0
830.0
913.0
996.0
1079.0
1162.0
1245.0
1328.0

DATA FOR BWSC PIPES


upto
500mm

Data Based on 2015-16 SSR


11/1/2015
Market
HR Plate Rate/ MT
SSR
as per
Variation per Kg

above
500mm

37500

36000

50000

50000

-12.50

-14.00

Data Based on 2015-16 SSR


Market
11/1/2015
Wire rods Rate/ MT as
SSR
per
Variation per Kg

Nov-15
36000
48000

Cement Rate/ MT as per

-12.00

BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002, Ex-factory including transportation, taxes and du

Deduct CED on
Raw material

Wh

R3

-12.50%

3.14
3.77
4.40
5.02
5.65
6.28
9.42
10.99
12.56
17.66
19.63
34.54
37.68

-39.25
-47.10
-54.95
-62.80
-70.65
-78.50
-131.88
-153.86
-175.84
-247.28
-274.75
-483.56
-527.52

4.50
6.22
8.21
10.48
13.03
16.53
19.15
25.21
32.68
30.06
36.13
25.49
30.30

-54.04
-74.64
-98.56
-125.80
-156.36
-198.31
-229.76
-302.48
-392.16
-360.68
-433.53
-305.87
-363.58

18.92
22.18
25.44
28.70
31.96
40.15
47.08
54.38
61.68
68.17
75.38
89.79
97.60

32.92
38.59
44.27
49.94
55.61
69.86
81.92
94.62
107.32
118.62
131.16
156.23
169.82

2.64
4.51
6.79
9.48
12.59
16.06
18.48
25.98
35.61
30.26
37.80
18.71
24.22

2737.00
3052.30
3714.00
4081.90
4576.00
4947.00
6081.80
7412.30
8933.70
10850.40
12885.10
16968.10
18494.50

12.50%

5%

342.13
381.54
464.25
510.24
572.00
618.38
760.23
926.54
1116.71
1356.30
1610.64
2121.01
2311.81

136.85
152.62
185.70
204.10
228.80
247.35
304.09
370.62
446.69
542.52
644.26
848.41
924.73

3215.98
3586.45
4363.95
4796.23
5376.80
5812.73
7146.12
8709.45
10497.10
12749.22
15139.99
19937.52
21731.04

Rate of
Conveyance per
Km/

(C2-C1)I 1000xWc

R2

Sub- Total

Required wt.of
cement per 1 Rmt

Wh

Add ST @

(W2-W1)I
1000xWw

R1

CED @

Required wt.of
Rods per 1 Rmt

Wh

Actual Rate of
Pipe per Rmt
R1+R2+R3

(H2-H1) I1000xWh

1200

2800
3140
3830
4230
4760
5170
6380
7800
9430
11370
13500
17620
19240

Required wt.of HR
plate per 1 Rmt

250
300
350
400
450
500
600
700
800
900
1000
1100

Basic Rate of Pipe


per Rmt as per
SSR

Dia of Pipes in
mm

BWSC 12Kg/Cm2

0.60
0.60
0.80
1.00
1.30
1.60
1.70
1.90
2.50
2.70
3.10
6.93
9.68

Cement Mortar coating

Cylinder thickness

thickness of joint rings

Internal Dia of steel


cylinder

Outside Dia of steel


cylinder

Cylinder Steel Area in


sq.mm/m

Total Steel Area (Factory


Test Pressure) in
sq.mm/m

Total Steel Area Site Test


Pressure) in sq.mm/m

Total Steel Area Working


Test Pressure) in
sq.mm/m

Area of bar / wire


reinforcement

Min. area of bar / wire


reinforcement

9.333 Kg/sq.cm
14 Kg/sq.cm
16.8 Kg/sq.cm

Cement Mortar lining ti

or
or
or

Wall thickness t

0.933 N/sq.mm
1.4 N/sq.mm
1.68 N/sq.mm

PIPE DIA

Working Pressure
Site Test Pressure
Factory Test Pressure

250
300
350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600

40
40
40
40
40
45
45
45
45
45
45
50
50
50
50
50
50

15
15
15
15
15
20
20
20
20
20
20
22
22
22
22
22
22

23.4
23.4
23.4
23.4
23.4
23.4
23.0
23.0
23.0
22.5
22.5
24.0
24.0
24.0
24.0
24.0
24.0

1.6
1.6
1.6
1.6
1.6
1.6
2.0
2.0
2.0
2.5
2.5
4.0
4.0
4.0
4.0
4.0
4.0

5
5
5
5
5
5
5
5
5
5
7
7
7
8
8
8
8

280
330
380
430
480
540
640
740
840
940
1040
1144
1244
1344
1444
1544
1644

283.2
333.2
383.2
433.2
483.2
543.2
644
744
844
945
1045
1152
1252
1352
1452
1552
1652

400
480
560
640
720
800
1200
1400
1600
2250
2500
4400
4800
5200
5600
6000
6400

1258
1482
1707
1932
2156
2426
2875
3324
3773
4222
4672
5139
5588
6037
6486
6936
7385

1188
1400
1612
1824
2036
2291
2715
3139
3564
3988
4412
4853
5278
5702
6126
6550
6975

1045
1232
1419
1605
1792
2016
2389
2763
3136
3509
3883
4271
4644
5018
5391
5764
6138

858
1002
1147
1292
1436
1626
1675
1924
2173
1972
2172
739
788
837
886
936
985

207.5
249
290.5
332
373.5
415
498
581
664
747
830
913
996
1079
1162
1245
1328

DATA FOR BWSC PIPES


Data Based on 2015-16 SSR
Nov-15
11/1/2015
Market
HR Plate Rate/ MT
SSR
as per
Variation per Kg

37500

Market
11/1/2015
Wire rods Rate/ MT as
SSR
per
Variation per Kg

50000
-12.50

36000
48000

Cement Rate/ MT as per

-12.00

BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002, Ex-factory including transportation, taxes and du

(C2-C1)I 1000xWc

Deduct CED on Raw


material

Wh

R3

-12.50%

12.50%

5.00%

Rate of Conveyance
per Km/

Required wt.of
cement per 1 Rmt

R2

Sub- Total

(W2-W1)I 1000xWw

Wh

Add ST @

Required wt.of
Rods per 1 Rmt

R1

CED @

(H2-H1) I1000xWh

Wh

Actual Rate of Pipe


per Rmt R1+R2+R3

Required wt.of HR
plate per 1 Rmt

Basic Rate of Pipe


per Rmt as per
SSR

Dia of Pipes in
mm

BWSC 14Kg/Cm2

250

2800

3.14

-39.25

5.87

-70.49

18.92

32.92

4.70

2718.50

339.81

135.93

3194.24

0.60

300

3140

3.77

-47.10

8.06

-96.76

22.18

38.59

7.27

3027.50

378.44

151.38

3557.31

0.60

350

3830

4.40

-54.95

10.86

-130.36

25.44

44.26

10.76

3678.20

459.78

183.91

4321.89

0.80

400

4230

5.02

-62.80

13.78

-165.34

28.70

49.93

14.43

4037.40

504.68

201.87

4743.95

1.00

450

4800

5.65

-70.65

17.04

-204.47

31.96

55.60

18.61

4561.90

570.24

228.10

5360.23

1.30

500

5520

6.28

-78.50

21.78

-261.41

40.15

69.86

23.94

5226.00

653.25

261.30

6140.55

1.60

600

6820

9.42

-131.88

26.27

-315.26

47.08

81.92

29.17

6425.60

803.20

321.28

7550.08

1.70

700

8520

10.99

-153.86

34.98

-419.77

54.38

94.62

40.64

8000.40

1000.05

400.02

9400.47

1.90

800

10350

12.56

-175.84

44.93

-539.21

61.68

107.32

53.99

9688.30

1211.04

484.42

11383.75

2.50

900

12510

17.66

-247.28

45.74

-548.86

68.17

118.62

53.78

11778.70

1472.34

588.94

13839.97

2.70

1000

14920

19.63

-274.75

55.64

-667.63

75.38

131.17

67.06

14041.70

1755.21

702.09

16499.00

3.10

1100

17990

34.54

-483.56

25.49

-305.87

89.79

156.24

18.70

17338.10

2167.26

866.91

20372.27

6.93

1200

20540

37.68

-527.52

30.30

-363.58

97.60

169.82

24.22

19794.50

2474.31

989.73

23258.54

9.68

Working Pressure
Site Test Pressure

1.067 N/sq.mm
1.6 N/sq.mm

or
or

10.667 Kg/sq.cm
16 Kg/sq.cm

1.92 N/sq.mm

or

19.2 Kg/sq.cm

PIPE DIA

Wall thickness t

Cement Mortar lining ti

Cement Mortar coating

Cylinder thickness

thickness of joint rings

Internal Dia of steel cylinder

Outside Dia of steel cylinder

Cylinder Steel Area in


sq.mm/m

Total Steel Area (Factory Test


Pressure) in sq.mm/m

Total Steel Area Site Test


Pressure) in sq.mm/m

Total Steel Area Working Test


Pressure) in sq.mm/m

Area of bar / wire


reinforcement

Min. area of bar / wire


reinforcement

Factory Test Pressure

250
300
350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600

40
40
40
40
40
45
45
45
45
45
45
50
50
50
50
50
50

15
15
15
15
15
20
20
20
20
20
20
22
22
22
22
22
22

23.4
23.4
23.4
23.4
23.4
23.4
23.0
23.0
23.0
22.5
22.5
24.0
24.0
24.0
24.0
24.0
24.0

1.6
1.6
1.6
1.6
1.6
1.6
2.0
2.0
2.0
2.5
2.5
4.0
4.0
4.0
4.0
4.0
4.0

5
5
5
5
5
5
5
5
5
5
7
7
7
8
8
8
8

280
330
380
430
480
540
640
740
840
940
1040
1144
1244
1344
1444
1544
1644

283.2
333.2
383.2
433.2
483.2
543.2
644
744
844
945
1045
1152
1252
1352
1452
1552
1652

400
480
560
640
720
800
1200
1400
1600
2250
2500
4400
4800
5200
5600
6000
6400

1437
1694
1951
2207
2464
2772
3286
3799
4312
4826
5339
5873
6386
6900
7413
7926
8440

1358
1600
1842
2085
2327
2618
3103
3588
4073
4558
5042
5547
6032
6516
7001
7486
7971

1195
1408
1621
1835
2048
2304
2731
3157
3584
4011
4437
4881
5308
5734
6161
6588
7014

1037
1214
1391
1567
1744
1972
2086
2399
2712
2576
2839
1473
1586
1700
1813
1926
2040

207.5
249
290.5
332
373.5
415
498
581
664
747
830
913
996
1079
1162
1245
1328

BWSC 16Kg/Cm2
Data Based on 2015-16 SSR
Market
HR Plate Rate/ MT
SSR
as per
Variation per Kg

11/1/2015

37500

Market
11/1/2015
Wire rods Rate/ MT as
SSR
per
Variation per Kg

50000
-12.50

Nov-15

36000
48000

Cement Rate/ MT as per

-12.00

(C2-C1)I 1000xWc

Deduct CED on Raw


material

Wh

R3

-12.50%

12.50%

5.00%

Rate of Conveyance
per Km/

Required wt.of
cement per 1 Rmt

R2

Sub- Total

(W2-W1)I 1000xWw

Wh

Add ST @

Required wt.of Rods


per 1 Rmt

R1

CED @

(H2-H1) I1000xWh

Wh

Actual Rate of Pipe


per Rmt R1+R2+R3

Required wt.of HR
plate per 1 Rmt

Basic Rate of Pipe


per Rmt as per SSR

Dia of Pipes in mm

BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002, Ex-factory including transportation, taxes and du

250

2800

3.14

-39.25

7.25

-86.94

18.92

32.92

6.75

2700.00

337.50

135.00

3172.50

0.60

300

3140

3.77

-47.10

9.91

-118.88

22.18

38.59

10.04

3002.60

375.33

150.13

3528.06

0.60

350

3830

4.40

-54.95

12.98

-155.79

25.44

44.26

13.94

3649.60

456.20

182.48

4288.28

0.80

400

4320

5.02

-62.80

16.47

-197.69

28.70

49.93

18.47

4091.00

511.38

204.55

4806.93

1.00

450

5120

5.65

-70.65

20.71

-248.57

31.96

55.60

24.12

4832.30

604.04

241.62

5677.95

1.30

500

5890

6.28

-78.50

26.29

-315.49

40.15

69.86

30.70

5535.20

691.90

276.76

6503.86

1.60

600

7370

9.42

-131.88

32.95

-395.41

47.08

81.92

39.19

6885.40

860.68

344.27

8090.35

1.70

700

9240

10.99

-153.86

43.73

-524.71

54.38

94.62

53.76

8602.30

1075.29

430.12

10107.70

1.90

800

11280

12.56

-175.84

56.02

-672.27

61.68

107.32

70.62

10468.60

1308.58

523.43

12300.61

2.50

900

13660

17.66

-247.28

59.46

-713.51

68.17

118.62

74.36

12743.50

1592.94

637.18

14973.61

2.70

1000

16530

19.63

-274.75

72.25

-867.05

75.38

131.17

91.99

15427.40

1928.43

771.37

18127.20

3.10

1100

19700

34.54

-483.56

41.42

-497.03

89.79

156.24

42.60

18833.10

2354.14

941.66

22128.89

6.93

1200

22620

37.68

-527.52

48.48

-581.73

97.60

169.82

51.49

21629.10

2703.64

1081.46

25414.19

9.68

Cement Mortar coating

Cylinder thickness

thickness of joint rings

Internal Dia of steel


cylinder

Outside Dia of steel


cylinder

Cylinder Steel Area in


sq.mm/m

Total Steel Area (Factory


Test Pressure) in
sq.mm/m

Total Steel Area Site


Test Pressure) in
sq.mm/m

Total Steel Area Working


Test Pressure) in
sq.mm/m

Area of bar / wire


reinforcement

Min. area of bar / wire


reinforcement

12.000 Kg/sq.cm
18 Kg/sq.cm
21.6 Kg/sq.cm

Cement Mortar lining ti

or
or
or

Wall thickness t

1.200 N/sq.mm
1.8 N/sq.mm
2.16 N/sq.mm

PIPE DIA

Working Pressure
Site Test Pressure
Factory Test Pressure

250
300
350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600

40
40
40
40
40
45
45
45
45
45
45
50
50
50
50
50
50

15
15
15
15
15
20
20
20
20
20
20
22
22
22
22
22
22

23.4
23.4
23.4
23.4
23.4
23.4
23.0
23.0
23.0
22.5
22.5
24.0
24.0
24.0
24.0
24.0
24.0

1.6
1.6
1.6
1.6
1.6
1.6
2.0
2.0
2.0
2.5
2.5
4.0
4.0
4.0
4.0
4.0
4.0

5
5
5
5
5
5
5
5
5
5
7
7
7
8
8
8
8

280
330
380
430
480
540
640
740
840
940
1040
1144
1244
1344
1444
1544
1644

283.2
333.2
383.2
433.2
483.2
543.2
644
744
844
945
1045
1152
1252
1352
1452
1552
1652

400
480
560
640
720
800
1200
1400
1600
2250
2500
4400
4800
5200
5600
6000
6400

1617
1906
2195
2483
2772
3119
3696
4274
4851
5429
6006
6607
7185
7762
8340
8917
9495

1527
1800
2073
2345
2618
2945
3491
4036
4582
5127
5673
6240
6785
7331
7876
8422
8967

1344
1584
1824
2064
2304
2592
3072
3552
4032
4512
4992
5491
5971
6451
6931
7411
7891

1217
1426
1635
1843
2052
2319
2496
2874
3251
3179
3506
2207
2385
2562
2740
2917
3095

207.5
249
290.5
332
373.5
415
498
581
664
747
830
913
996
1079
1162
1245
1328

BWSC 18 Kg/Cm2
Nov-15
Market
HR Plate Rate/ MT
SSR
as per
Variation per Kg

11/1/2015

37500

Market
11/1/2015
Wire rods Rate/ MT as
SSR
per
Variation per Kg

50000
-12.50

36000
48000

Cement Rate/ MT as per

-12.00

(C2-C1)I 1000xWc

Deduct CED on Raw


material

Wh

R3

-12.50%

12.50%

5.00%

Rate of Conveyance
per Km/

Required wt.of cement


per 1 Rmt

R2

Sub- Total

(W2-W1)I 1000xWw

Wh

Add ST @

Required wt.of Rods


per 1 Rmt

R1

CED @

(H2-H1) I1000xWh

Wh

Actual Rate of Pipe per


Rmt R1+R2+R3

Required wt.of HR plate


per 1 Rmt

Basic Rate of Pipe per


Rmt as per SSR

Dia of Pipes in mm

BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002, Ex-factory including transportation, taxes and du

250

2800

3.14

-39.25

8.42

-101.04

18.92

32.92

8.52

2684.10

335.51

134.21

3153.82

0.60

300

3140

3.77

-47.10

11.52

-138.23

22.18

38.59

12.46

2980.80

372.60

149.04

3502.44

0.60

350

3900

4.40

-54.95

15.37

-184.41

25.44

44.26

17.52

3687.40

460.93

184.37

4332.70

0.80

400

4560

5.02

-62.80

19.47

-233.63

28.70

49.93

22.96

4290.50

536.31

214.53

5041.34

1.00

450

5420

5.65

-70.65

24.39

-292.67

31.96

55.60

29.63

5082.70

635.34

254.14

5972.17

1.30

500

6280

6.28

-78.50

30.80

-369.57

40.15

69.86

37.46

5864.30

733.04

293.22

6890.55

1.60

600

7890

9.42

-131.88

39.18

-470.22

47.08

81.92

48.54

7321.30

915.16

366.07

8602.53

1.70

700

9960

10.99

-153.86

52.47

-629.65

54.38

94.62

66.88

9204.20

1150.53

460.21

10814.94

1.90

800

12310

12.56

-175.84

67.11

-805.32

61.68

107.32

87.25

11348.90

1418.61

567.45

13334.96

2.50

900

14930

17.66

-247.28

73.18

-878.17

68.17

118.62

94.94

13828.20

1728.53

691.41

16248.14

2.70

1000

18090

19.63

-274.75

89.60

-1075.14

75.38

131.17

118.00

16753.30

2094.16

837.67

19685.13

3.10

1100

21610

34.54

-483.56

62.13

-745.55

89.79

156.24

73.66

20463.50

2557.94

1023.18

24044.61

6.93

1200

24790

37.68

-527.52

72.72

-872.59

97.60

169.82

87.85

23471.90

2933.99

1173.60

27579.48

9.68

Cement Mortar coating

Cylinder thickness

thickness of joint rings

Internal Dia of steel


cylinder

Outside Dia of steel


cylinder

Cylinder Steel Area in


sq.mm/m

Total Steel Area


(Factory Test Pressure)
in sq.mm/m

Total Steel Area Site


Test Pressure) in
sq.mm/m

Total Steel Area Working


Test Pressure) in sq.mm/m

Area of bar / wire


reinforcement

Min. area of bar / wire


reinforcement

20.0 Kg/sq.cm
24 Kg/sq.cm

Cement Mortar lining ti

or
or

Wall thickness t

2 N/sq.mm
2.4 N/sq.mm

PIPE DIA

Site Test Pressure


Factory Test Pressure

250
300
350
400
450
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600

40
40
40
40
40
45
45
45
45
45
45
50
50
50
50
50
50

15
15
15
15
15
20
20
20
20
20
20
22
22
22
22
22
22

23.4
23.4
23.4
23.4
23.4
23.4
23.0
23.0
23.0
22.5
22.5
24.0
24.0
24.0
24.0
24.0
24.0

1.6
1.6
1.6
1.6
1.6
1.6
2.0
2.0
2.0
2.5
2.5
4.0
4.0
4.0
4.0
4.0
4.0

5
5
5
5
5
5
5
5
5
5
7
7
7
8
8
8
8

280
330
380
430
480
540
640
740
840
940
1040
1144
1244
1344
1444
1544
1644

283.2
333.2
383.2
433.2
483.2
543.2
644
744
844
945
1045
1152
1252
1352
1452
1552
1652

400
480
560
640
720
800
1200
1400
1600
2250
2500
4400
4800
5200
5600
6000
6400

1797
2118
2439
2759
3080
3465
4107
4749
5390
6032
6674
7341
7983
8625
9266
9908
10550

1697
2000
2303
2606
2909
3273
3879
4485
5091
5697
6303
6933
7539
8145
8752
9358
9964

-977301
-1151819
-1326337
-1500855
-1675373
-1884794
-2233830
-2582866
-2931902
-3280938
-3629974
-3992972
-4342008
-4691044
-5040080
-5389116
-5738152

1397
1638
1879
2119
2360
2665
2907
3349
3790
3782
4174
2941
3183
3425
3666
3908
4150

207.5
249
290.5
332
373.5
415
498
581
664
747
830
913
996
1079
1162
1245
1328

DATA FOR BWSC 20 Kg/Cm2 PIPES


Nov-15
11/1/2015
Market
HR Plate Rate/ MT
SSR
as per
Variation per Kg

37500

Market
11/1/2015
Wire rods Rate/ MT as
SSR
per
Variation per Kg

50000
-12.50

36000
48000

Cement Rate/ MT as per

-12.00

(C2-C1)I 1000xWc

Deduct CED on
Raw material

Wh

R3

-12.50%

12.50%

5.00%

Rate of
Conveyance per
Km/

Required wt.of
cement per 1 Rmt

R2

Sub- Total

(W2-W1)I 1000xWw

Wh

Add ST @

Required wt.of
Rods per 1 Rmt

R1

CED @

(H2-H1) I1000xWh

Wh

Actual Rate of
Pipe per Rmt
R1+R2+R3

Required wt.of HR
plate per 1 Rmt

Basic Rate of Pipe


per Rmt as per
SSR

Dia of Pipes in
mm

BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002, Ex-factory including transportation, taxes and duties etc., for Bar wrapped steel cylin

250

2800

3.14

-39.25

9.59

-115.14

18.92

32.92

10.28

2668.30

333.54

133.42

3135.25

0.60

300

3140

3.77

-47.10

13.36

-160.35

22.18

38.59

15.22

2955.90

369.49

147.80

3473.18

0.60

350

4080

4.40

-54.95

17.49

-209.84

25.44

44.26

20.70

3838.80

479.85

191.94

4510.59

0.80

400

4810

5.02

-62.80

22.46

-269.57

28.70

49.93

27.46

4500.10

562.51

225.01

5287.62

1.00

450

5712

5.65

-70.65

27.73

-332.76

31.96

55.60

34.65

5329.50

666.19

266.48

6262.16

1.30

500

6660

6.28

-78.50

35.30

-423.66

40.15

69.86

44.23

6183.50

772.94

309.18

7265.61

1.60

600

8440

9.42

-131.88

45.86

-550.37

47.08

81.92

58.56

7781.10

972.64

389.06

9142.79

1.70

700

10780

10.99

-153.86

60.70

-728.42

54.38

94.62

79.23

9913.10

1239.14

495.66

11647.89

1.90

800

13460

12.56

-175.84

78.20

-938.37

61.68

107.32

103.88

12349.20

1543.65

617.46

14510.31

2.50

900

16250

17.66

-247.28

87.56

-1050.67

68.17

118.62

116.51

14954.20

1869.28

747.71

17571.19

2.70

1000

19580

19.63

-274.75

106.94

-1283.24

75.38

131.17

144.01

18009.20

2251.15

900.46

21160.81

3.10

1100

23470

34.54

-483.56

82.84

-994.06

89.79

156.24

104.73

22043.90

2755.49

1102.20

25901.58

6.93

1200

27000

37.68

-527.52

97.82

-1173.85

97.60

169.82

125.50

25343.00

3167.88

1267.15

29778.03

9.68

Actual bar / wire


reinforcement in
sq.mm

Cement Mortar
Lining Quantity

Cement Mortar
coating quantity

Total CM quantity

Cement in Kgs

Wt of steel plate in
Kgs

Wt. of wire in Kgs

R BWSC PIPES

657
766
875
984
1093
1239
1217
1394
1572
1300
1427
913
996
1079
1162
1245
1328

0.0125
0.0149
0.0172
0.0196
0.0219
0.0327
0.0390
0.0453
0.0515
0.0578
0.0641
0.0776
0.0845
0.0914
0.0983
0.1052
0.1121

0.0225
0.0262
0.0299
0.0336
0.0373
0.0417
0.0482
0.0554
0.0627
0.0684
0.0755
0.0887
0.0962
0.1038
0.1113
0.1189
0.1264

0.0350
0.0411
0.0471
0.0531
0.0592
0.0744
0.0872
0.1007
0.1142
0.1262
0.1396
0.1663
0.1807
0.1952
0.2097
0.2241
0.2386

18.922
22.181
25.439
28.698
31.956
40.152
47.080
54.378
61.676
68.172
75.385
89.792
97.599
105.406
113.213
121.020
128.827

3.140
3.768
4.396
5.024
5.652
6.280
9.420
10.990
12.560
17.663
19.625
34.540
37.680
40.820
43.960
47.100
50.240

4.504
6.220
8.214
10.483
13.030
16.526
19.147
25.207
32.680
30.056
36.127
25.489
30.298
35.523
41.162
47.216
53.685

R BWSC PIPES
Market

11/1/2015

5740

SSR

4000

Variation per Kg

1.74

Ex-factory including transportation, taxes and duties etc., for Bar wrapped steel cylindrical pipes.

150

90.0
90.0
120.0
150.0
195.0
240.0
255.0
285.0
375.0
405.0
465.0
1039.5
1452.0

20%

306.0
476.0
476.0
596.0
733.0
854.0
971.0
1142.0
1262.0
1483.0
1660.0
1348.0
1509.0

61.20
95.20
95.20
119.20
146.60
170.80
194.20
228.40
252.40
296.60
332.00
269.60
301.80

Rate per 1Rmt

Add over heads


on pipe ,
Transport &
Laying

Sub- Total of pipe


+ Transport +
laying

Add extra % on
Labour
component @

Cost of laying,
jointing and
testing

Conveyance
charges per 1 Rmt
for

C 12Kg/Cm2

14%

3673.18
4247.65
5055.15
5661.43
6451.40
7077.53
8566.32
10364.85
12386.50
14933.82
17596.99
22594.62
24993.84

434.89
505.59
599.77
673.55
769.33
845.74
1021.40
1234.57
1473.57
1774.72
2088.83
2671.97
2962.26

4108.07
4753.24
5654.92
6334.98
7220.73
7923.27
9587.72
11599.42
13860.07
16708.54
19685.82
25266.59
27956.10

Actual bar / wire


reinforcement in sq.mm

Cement Mortar Lining


Quantity

Cement Mortar coating


quantity

Total CM quantity

Cement in Kgs

Wt of steel plate in Kgs

Wt. of wire in Kgs

858
1002
1147
1292
1436
1626
1675
1924
2173
1972
2172
913
996
1079
1162
1245
1328

0.0125
0.0149
0.0172
0.0196
0.0219
0.0327
0.0390
0.0453
0.0515
0.0578
0.0641
0.0776
0.0845
0.0914
0.0983
0.1052
0.1121

0.0225
0.0262
0.0299
0.0336
0.0373
0.0417
0.0482
0.0554
0.0627
0.0684
0.0755
0.0887
0.0962
0.1038
0.1113
0.1189
0.1264

0.0350
0.0411
0.0471
0.0531
0.0592
0.0744
0.0872
0.1007
0.1142
0.1262
0.1396
0.1663
0.1807
0.1952
0.2097
0.2241
0.2386

18.922
22.181
25.439
28.698
31.956
40.152
47.080
54.378
61.676
68.172
75.385
89.792
97.599
105.406
113.213
121.020
128.827

3.140
3.768
4.396
5.024
5.652
6.280
9.420
10.990
12.560
17.663
19.625
34.540
37.680
40.820
43.960
47.100
50.240

5.874
8.063
10.863
13.778
17.039
21.784
26.272
34.981
44.935
45.738
55.636
25.489
30.298
35.523
41.162
47.216
53.685

R BWSC PIPES
Market

11/1/2015

5740

SSR

4000

Variation per Kg

1.74

Ex-factory including transportation, taxes and duties etc., for Bar wrapped steel cylindrical pipes.

250

20%

Rate per 1Rmt

Add over heads on


pipe , Transport &
Laying

Sub- Total of pipe +


Transport + laying

Add extra % on
Labour component
@

Cost of laying,
jointing and testing

Conveyance
charges per 1 Rmt
for

C 14Kg/Cm2

14%

90.0

306.0

61.20

3651.44

432.37

4083.81

90.0

476.0

95.20

4218.51

502.22

4720.73

120.0

476.0

95.20

5013.09

594.89

5607.98

150.0

596.0

119.20

5609.15

667.49

6276.64

195.0

733.0

146.60

6434.83

767.41

7202.24

240.0

854.0

170.80

7405.35

883.72

8289.07

255.0

971.0

194.20

8970.28

1068.21

10038.49

285.0

1142.0

228.40

11055.87

1314.64

12370.51

375.0

1262.0

252.40

13273.15

1576.30

14849.45

405.0

1483.0

296.60

16024.57

1901.10

17925.67

465.0

1660.0

332.00

18956.00

2246.30

21202.30

1039.5

1348.0

269.60

23029.37

2722.35

25751.72

1452.0

1509.0

301.80

26521.34

3139.25

29660.59

Actual bar / wire


reinforcement in sq.mm

Cement Mortar Lining


Quantity

Cement Mortar coating


quantity

Total CM quantity

Cement in Kgs

Wt of steel plate in Kgs

Wt. of wire in Kgs

1037
1214
1391
1567
1744
1972
2086
2399
2712
2576
2839
1473
1586
1700
1813
1926
2040

0.0125
0.0149
0.0172
0.0196
0.0219
0.0327
0.0390
0.0453
0.0515
0.0578
0.0641
0.0776
0.0845
0.0914
0.0983
0.1052
0.1121

0.0225
0.0262
0.0299
0.0336
0.0373
0.0417
0.0482
0.0554
0.0627
0.0684
0.0755
0.0887
0.0962
0.1038
0.1113
0.1189
0.1264

0.0350
0.0411
0.0471
0.0531
0.0592
0.0744
0.0872
0.1007
0.1142
0.1262
0.1396
0.1663
0.1807
0.1952
0.2097
0.2241
0.2386

18.922
22.181
25.439
28.698
31.956
40.152
47.080
54.378
61.676
68.172
75.385
89.792
97.599
105.406
113.213
121.020
128.827

3.140
3.768
4.396
5.024
5.652
6.280
9.420
10.990
12.560
17.663
19.625
34.540
37.680
40.820
43.960
47.100
50.240

7.245
9.907
12.983
16.474
20.714
26.291
32.951
43.726
56.022
59.459
72.254
41.419
48.477
56.089
64.253
72.971
82.241

C 16Kg/Cm2
Market

11/1/2015

5740

SSR

4000

Variation per Kg

1.74

20.0%

250

Rate per 1Rmt

Add over heads on


pipe , Transport &
Laying

Sub- Total of pipe +


Transport + laying

Add extra % on
Labour component @

Cost of laying,
jointing and testing

Conveyance charges
per 1 Rmt for

Ex-factory including transportation, taxes and duties etc., for Bar wrapped steel cylindrical pipes.

13.6%

90.0

306.0

61.20

3629.70

429.85

4059.55

90.0

476.0

95.20

4189.26

498.83

4688.09

120.0

476.0

95.20

4979.48

591.00

5570.48

150.0

596.0

119.20

5672.13

674.79

6346.92

195.0

733.0

146.60

6752.55

804.22

7556.77

240.0

854.0

170.80

7768.66

925.82

8694.48

255.0

971.0

194.20

9510.55

1130.81

10641.36

285.0

1142.0

228.40

11763.10

1396.59

13159.69

375.0

1262.0

252.40

14190.01

1682.54

15872.55

405.0

1483.0

296.60

17158.21

2032.46

19190.67

465.0

1660.0

332.00

20584.20

2434.96

23019.16

1039.5

1348.0

269.60

24785.99

2925.89

27711.88

1452.0

1509.0

301.80

28676.99

3389.03

32066.02

Actual bar / wire


reinforcement in sq.mm

Cement Mortar Lining


Quantity

Cement Mortar coating


quantity

Total CM quantity

Cement in Kgs

Wt of steel plate in Kgs

Wt. of wire in Kgs

1217
1426
1635
1843
2052
2319
2496
2874
3251
3179
3506
2207
2385
2562
2740
2917
3095

0.0125
0.0149
0.0172
0.0196
0.0219
0.0327
0.0390
0.0453
0.0515
0.0578
0.0641
0.0776
0.0845
0.0914
0.0983
0.1052
0.1121

0.0225
0.0262
0.0299
0.0336
0.0373
0.0417
0.0482
0.0554
0.0627
0.0684
0.0755
0.0887
0.0962
0.1038
0.1113
0.1189
0.1264

0.0350
0.0411
0.0471
0.0531
0.0592
0.0744
0.0872
0.1007
0.1142
0.1262
0.1396
0.1663
0.1807
0.1952
0.2097
0.2241
0.2386

18.922
22.181
25.439
28.698
31.956
40.152
47.080
54.378
61.676
68.172
75.385
89.792
97.599
105.406
113.213
121.020
128.827

3.140
3.768
4.396
5.024
5.652
6.280
9.420
10.990
12.560
17.663
19.625
34.540
37.680
40.820
43.960
47.100
50.240

8.420
11.519
15.367
19.469
24.389
30.798
39.185
52.471
67.110
73.181
89.595
62.129
72.716
85.068
97.384
110.529
124.504

C 18 Kg/Cm2
Market

11/1/2015

5740

SSR

4000

Variation per Kg

1.74

20.0%

250

Rate per 1Rmt

Add over heads on


pipe , Transport &
Laying

Sub- Total of pipe +


Transport + laying

Add extra % on Labour


component @

Cost of laying, jointing


and testing

Conveyance charges
per 1 Rmt for

Ex-factory including transportation, taxes and duties etc., for Bar wrapped steel cylindrical pipes.

13.6%

90.0

306.0

61.20

3611.02

427.69

4038.71

90.0

476.0

95.20

4163.64

495.86

4659.50

120.0

476.0

95.20

5023.90

596.15

5620.05

150.0

596.0

119.20

5906.54

701.95

6608.49

195.0

733.0

146.60

7046.77

838.32

7885.09

240.0

854.0

170.80

8155.35

970.63

9125.98

255.0

971.0

194.20

10022.73

1190.16

11212.89

285.0

1142.0

228.40

12470.34

1478.53

13948.87

375.0

1262.0

252.40

15224.36

1802.39

17026.75

405.0

1483.0

296.60

18432.74

2180.14

20612.88

465.0

1660.0

332.00

22142.13

2615.48

24757.61

1039.5

1348.0

269.60

26701.71

3147.87

29849.58

1452.0

1509.0

301.80

30842.28

3639.93

34482.21

Actual bar / wire


reinforcement in sq.mm

Cement Mortar Lining


Quantity

Cement Mortar coating


quantity

Total CM quantity

Cement in Kgs

Wt of steel plate in Kgs

Wt. of wire in Kgs

1397
1638
1879
2119
2360
2665
2907
3349
3790
3782
4174
2941
3183
3425
3666
3908
4150

0.0125
0.0149
0.0172
0.0196
0.0219
0.0327
0.0390
0.0453
0.0515
0.0578
0.0641
0.0776
0.0845
0.0914
0.0983
0.1052
0.1121

0.0225
0.0262
0.0299
0.0336
0.0373
0.0417
0.0482
0.0554
0.0627
0.0684
0.0755
0.0887
0.0962
0.1038
0.1113
0.1189
0.1264

0.0350
0.0411
0.0471
0.0531
0.0592
0.0744
0.0872
0.1007
0.1142
0.1262
0.1396
0.1663
0.1807
0.1952
0.2097
0.2241
0.2386

18.922
22.181
25.439
28.698
31.956
40.152
47.080
54.378
61.676
68.172
75.385
89.792
97.599
105.406
113.213
121.020
128.827

3.140
3.768
4.396
5.024
5.652
6.280
9.420
10.990
12.560
17.663
19.625
34.540
37.680
40.820
43.960
47.100
50.240

9.595
13.362
17.487
22.465
27.730
35.305
45.864
60.702
78.198
87.556
106.936
82.839
97.821
113.112
130.514
148.087
167.909

WSC 20 Kg/Cm2 PIPES


Market

11/1/2015

5740

SSR

4000

Variation per Kg

1.74

20.0%

250

Rate per 1Rmt

Add over heads on


pipe , Transport &
Laying

Sub- Total of pipe +


Transport + laying

Add extra % on
Labour component
@

Cost of laying,
jointing and testing

Conveyance
charges per 1 Rmt
for

axes and duties etc., for Bar wrapped steel cylindrical pipes.

13.6%

90.0

306.0

61.20

3592.45

425.54

4017.99

90.0

476.0

95.20

4134.38

492.47

4626.85

120.0

476.0

95.20

5201.79

616.76

5818.55

150.0

596.0

119.20

6152.82

730.49

6883.31

195.0

733.0

146.60

7336.76

871.92

8208.68

240.0

854.0

170.80

8530.41

1014.09

9544.50

255.0

971.0

194.20

10562.99

1252.76

11815.75

285.0

1142.0

228.40

13303.29

1575.05

14878.34

375.0

1262.0

252.40

16399.71

1938.59

18338.30

405.0

1483.0

296.60

19755.79

2333.45

22089.24

465.0

1660.0

332.00

23617.81

2786.47

26404.28

1039.5

1348.0

269.60

28558.68

3363.04

31921.72

1452.0

1509.0

301.80

33040.83

3894.68

36935.51

ABSTRACT - FINISHED ITEM OF RATES FOR MATERIAL & WORKS


S.N

DESCRIPTION OF ITEM

WATER SUPPLY
DI PIPES
A

COST OF DI K7 PIPES - 5.50m LENGTH -S/S

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

COST OF DI K7 PIPES - 6.00m LENGTH - S/S

16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

COST OF DI K9 PIPES - 5.50m LENGTH - S/S

31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

S.N

DESCRIPTION OF ITEM

COST OF DI K9 PIPES - 5.50m LENGTH - S/S

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

COST OF RUBBER GASKETS DI PIPES

61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77

80mm dia
100mm dia
125mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

COST OF DI SPECIALS

78
79

Specials Below 500mm dia


Specials Above 500mm dia

S.N
A
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102

B
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125

DESCRIPTION OF ITEM
HDPE PIPES
HDPE PIPES 4Kg/Sqcm -PE -80 Grade
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
710 mm
800 mm
900 mm
1000 mm

HDPE PIPES 6Kg/Sqcm -PE -100 Grade


63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
710 mm
800 mm
900 mm
1000 mm

S.N
C
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147

D
a
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165

DESCRIPTION OF ITEM
HDPE PIPES 8Kg/Sqcm -PE -100 Grade
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
710 mm
800 mm
900 mm

HDPE SPECIALS
PIPE ENDS LONG NECK
OD 50 mm
OD 63 mm
OD 75 mm
OD 90 mm
OD 110 mm
OD 125 mm
OD 140 mm
OD 160 mm
OD 180 mm
OD 200 mm
OD 225 mm
OD 250 mm
OD 280 mm
OD 315 mm
OD 355 mm
OD 400 mm
OD 450 mm
OD 500 mm

S.N
b
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
c
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201

DESCRIPTION OF ITEM
MS FLANGES
OD 50 mm
OD 63 mm
OD 75 mm
OD 90 mm
OD 110 mm
OD 125 mm
OD 140 mm
OD 160 mm
OD 180 mm
OD 200 mm
OD 225 mm
OD 250 mm
OD 280 mm
OD 315 mm
OD 355 mm
OD 400 mm
OD 450 mm
OD 500 mm
END CAPS
OD 50 mm
OD 63 mm
OD 75 mm
OD 90 mm
OD 110 mm
OD 125 mm
OD 140 mm
OD 160 mm
OD 180 mm
OD 200 mm
OD 225 mm
OD 250 mm
OD 280 mm
OD 315 mm
OD 355 mm
OD 400 mm
OD 450 mm
OD 500 mm

S.N
d
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
e
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236

DESCRIPTION OF ITEM
REDUCERS
OD 50 mm x 63 mm
OD 63 mm x 75 mm
OD 75 mm x 90 mm
OD 90 mm x 110 mm
OD 110 mm x 125 mm
OD 125 mm x 140 mm
OD 140 mm x 160 mm
OD 160 mm x 180 mm
OD 180 mm x 200 mm
OD 200 mm x 225 mm
OD 225 mm x 250 mm
OD 250 mm x 280 mm
OD 280 mm x 315 mm
OD 315 mm x 355 mm
OD 355 mm x 400 mm
OD 400 mm x 450 mm
OD 450 mm x 500 mm
EQUAL TEEs
OD 50 mm
OD 63 mm
OD 75 mm
OD 90 mm
OD 110 mm
OD 125 mm
OD 140 mm
OD 160 mm
OD 180 mm
OD 200 mm
OD 225 mm
OD 250 mm
OD 280 mm
OD 315 mm
OD 355 mm
OD 400 mm
OD 450 mm
OD 500 mm

RCC PIPES
A
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254

RCC PLAIN ENDED PIPES - ( NP-2 CLASS )


100mm
150mm
200mm
225mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1400mm

S.N
255
256

DESCRIPTION OF ITEM
1600mm
1800mm

S.N
B
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271

C
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286

D
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301

DESCRIPTION OF ITEM
RCC PLAIN ENDED PIPES - ( NP-3 CLASS )
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1400mm
1600mm
1800mm

R.C.C. COLLARS TO SUIT NP-2 PIPES


100mm
150mm
200mm
225mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm

R.C.C. COLLARS TO SUIT NP- 3 PIPES


300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1400mm
1600mm
1800mm

S.N
E
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320

E
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335

F
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355

DESCRIPTION OF ITEM
R.C.C. Socket and Spigot (SS) NP- 2 PIPES
100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1400mm
1600mm
1800mm

R.C.C. Socket and Spigot (SS) NP- 3 PIPES


300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1400mm
1600mm
1800mm

Rubber Rings for RCC NP2 Pipes


80mm
100mm
150mm
200mm
225mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1400mm
1600mm

S.N
356

DESCRIPTION OF ITEM
1800mm

S.N
G
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371

DESCRIPTION OF ITEM
Rubber Rings for RCC NP3 Pipes
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1400mm
1600mm
1800mm

PVC PIPES
A
372
373
374
375
376
377
378
379
380
381
382
383
384

B
385
386
387
388
389
390
391
392
393
394
395

C
396
397
398
399
400
401

U-PVC Pipes for WS - IS : 4985/2000 - 4 Kg/ Cm 2


63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
U-PVC Pipes for WS - IS : 4985/2000 - 6 Kg/ Cm 2
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
PVC-U Pipes for Sewer -I S 15328/2003 -(S16.5)
110 mm
125 mm
160 mm
200 mm
250mm
315 mm

S.N

DESCRIPTION OF ITEM
LOWERING & JOINTING

DI PIPES -S/S - LOWERING


100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

DI PIPES -FLANGED ENDS - LOWERING


100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

DI PIPES -S/S - JOINTING WITH GASKETS


100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
650mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

S.N
D

DESCRIPTION OF ITEM
DI PIPES - FLANGED - JOINTING
100mm dia
150mm dia
200mm dia
250mm dia
300mm dia
350mm dia
400mm dia
450mm dia
500mm dia
600mm dia
700mm dia
750mm dia
800mm dia
900mm dia
1000mm dia

RCC S/S - LOWERING & JOINTING - NP-2


100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm

RCC S/S - LOWERING & JOINTING - NP-3


300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm

HDPE - LOWERING & JOINTING


63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm

S.N

DESCRIPTION OF ITEM
400 mm
450 mm

S.N
H

DESCRIPTION OF ITEM
U-PVC - LOWERING & JOINTING
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm

OR MATERIAL & WORKS


RATE

Aug-13
UNIT

1129.88
1569.93
2166.58
2904.33
3745.34
4701.31
5696.39
6856.54
8171.84
10890.57
14141.10
15877.20
17861.60
21595.35
25435.05

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

1129.88
1569.93
2166.58
2904.33
3745.34
4701.31
5696.39
6856.54
8171.84
10890.57
14141.10
15877.20
17861.60
21595.35
25435.05

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

1338.01
1979.89
2643.22
3464.22
4382.35
5471.86
6584.24
7881.88
9173.22
12096.47
15686.31
17638.11
19775.15
23921.37
28194.99

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

RATE

UNIT
1338.01
1979.89
2643.22
3464.22
4382.35
5471.86
6584.24
7881.88
9173.22
12096.47
15686.31
17638.11
19775.15
23921.37
28194.99

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

71.90
112.26
133.71
163.98
199.30
222.01
338.06
428.88
467.98
503.30
698.82
827.48
1099.94
1221.04
1464.49
1767.22
1933.73

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

133.58
149.56

1 Kg
1 Kg

RATE

UNIT

97.13
132.45
190.47
282.55
365.81
451.58
590.34
744.23
913.25
1188.24
1469.53
1832.81
2328.54
2828.06
3664.37
4657.09
5720.45
7073.93
8947.11
11369.00
14390.05
18233.54
22452.92

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

114.79
162.72
230.84
346.89
442.75
556.28
726.57
914.52
1130.21
1460.70
1797.50
2252.86
2855.81
3583.64
4720.16
5861.73
7249.27
8404.71
10594.50
13478.06
17104.58
21668.33
26720.24

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

RATE

UNIT
146.32
206.87
295.17
440.23
567.63
710.17
924.61
1170.58
1445.56
1866.87
2307.10
2888.61
3658.06
4581.40
6028.23
7516.68
9267.51
10752.17
13604.20
17239.55
21887.81
27707.91

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

96.53
121.71
145.49
188.86
261.61
470.06
475.64
663.11
940.10
1208.71
1386.37
1622.81
1814.47
2091.45
4371.77
5825.29
9694.84
10788.83

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

RATE

UNIT
151.09
191.66
242.02
260.21
274.20
376.32
408.49
535.81
755.44
979.28
1224.10
1445.13
1639.59
1929.17
3266.59
4051.42
5289.50
6056.12

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

64.35
78.34
97.92
130.09
148.29
205.65
239.23
367.94
595.95
650.51
678.51
965.28
987.67
1349.99
2084.46
3640.11
5854.68
10788.83

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

RATE

UNIT
90.93
130.09
212.65
295.18
449.07
621.14
867.36
1201.71
1552.86
1905.39
2597.89
3690.47
5218.15
5983.38
8444.16
8758.93
11230.90

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

124.51
198.65
239.23
421.09
499.44
751.24
1036.64
1783.68
2420.21
3332.34
4729.90
6475.82
9068.11
12926.45
18431.39
26995.87
38347.08
52665.51

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

203.00
238.40
288.80
313.40
334.30
475.40
600.10
683.50
838.20
922.90
1363.40
1749.40
2129.30
2706.90
3302.60
3888.70
4595.10
6156.80

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

RATE

UNIT
7130.10
#REF!

1 Rmt
1 Rmt

RATE

UNIT
1058.00
1329.00
1475.20
1670.00
1821.10
2711.10
3362.30
4392.70
5527.70
6829.90
7993.10
9366.50
12055.00
15576.60
20495.30

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

49.40
51.20
67.90
72.60
79.70
105.40
129.10
142.20
223.30
254.10
342.60
444.30
626.20
748.70
874.10

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

149.40
183.80
211.40
280.30
333.10
436.00
586.90
745.10
868.20
1084.20
1372.10
1717.50
2173.30
2785.70
3587.60

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

RATE

UNIT
239.96
280.14
348.20
407.92
574.42
736.12
807.62
1007.98
1161.90
1638.42
2119.60
2719.12
3478.37
4198.42
4915.67
5570.13
7830.79
9654.22
10936.01

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

1354.07
1754.54
1958.43
2126.84
2431.13
3395.03
4335.61
5707.34
7158.42
8121.68
8254.62
11224.05
14789.23
19181.44
25244.36

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

3.36
4.06
7.28
8.54
9.38
10.50
12.88
14.84
16.38
18.62
24.36
31.92
43.40
55.16
69.02
80.64
97.02
155.26
170.80
212.66

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

RATE

UNIT
264.88

1 No

RATE

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

UNIT
148.85
177.86
201.82
229.57
262.37
382.20
456.63
553.75
749.27
903.16
1156.70
1454.39
1599.46
1952.65
2493.79

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

60.55
88.30
121.09
175.33
228.31
285.08
375.90
480.59
584.03
771.98
900.64
1179.41
1492.24

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

172.81
249.76
319.13
412.48
532.31
686.20
835.05
1116.34
1374.93
1735.69
2180.96

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

RATE

UNIT

29.93
48.77
70.90
95.79
123.89
155.39
189.64
229.42
267.44
357.07
460.67
516.41
576.57
700.91
845.28

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

36.97
60.40
86.89
117.65
151.87
191.45
233.44
281.07
328.34
439.91
569.04
642.64
648.24
842.12
1095.20

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

93.12
116.25
130.59
149.97
172.75
204.08
223.11
255.03
278.14
324.40
347.53
370.66
385.00
619.28
711.34
780.56

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

RATE

UNIT
277.88
445.43
487.97
709.16
743.92
1074.52
1716.38
2001.64
2324.41
3241.64
4131.91
4440.40
7814.40
9190.80
10583.48

1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No
1 No

51.07
62.85
65.50
88.43
97.64
107.35
119.45
130.28
140.42
151.32
336.38
403.96
483.84
579.08

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

105.17
116.35
129.67
141.90
153.70
170.67
336.38
403.96
483.84
579.08

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

49.16
53.76
61.44
69.12
84.48
89.08
96.76
105.98
115.20
127.48
135.16
149.00
254.98
284.16

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

RATE

UNIT
316.42
351.74

1 Rmt
1 Rmt

RATE

UNIT
14.63
17.44
20.88
25.55
29.04
32.49
37.15
41.76
46.43
52.21
58.04
64.98
73.09

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

Page 2607 of 3205

DATA - INTAKE WELL


Kandukur Municipality
DATA BASED ON - 2015 - 2016 SSR
1

20/02/16
RBR-FNDN-1-(i-A-i) : Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing
in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary so
Ordinary Soils : for Sumps, intake wells, Thrust Blocks and Man Holes etc,.
By Manual means
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
0 Nos.
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)
3.64 Nos.
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
VAT & labour cess
Rate per 1 Cum excluding Dewatering

14%

#REF!

RBR-FNDN-1-(i-B-i) : Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing
in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH - in Ordinary so

Ordinary soils-Mechcanical Means-Upto 3 m depth

out put

a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)

240

0 Nos.
8.32 Nos.

b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)

6 hours
Sub total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & labour cess
Rate per 1 Cum excluding Dewatering
3

14%

#REF!

RBR-FNDN-1-(i-B-ii) : Earthwork in excavation for structures as per drawing and technical specifications Cla
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 5
and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Ordinary Soils-Mechcanical Means-3 m to 6 m depth

out put

a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)

0 Nos.
8.32 Nos.

b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)

6 hours
Sub total

c&d) Overheads & Contractors Profit


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
337269598.xlsx data-Intake well -sinking

14%

210

Page 2608 of 3205

VAT & labour cess

#REF!

Rate per 1 Cum excluding Dewatering

337269598.xlsx data-Intake well -sinking

Page 2609 of 3205

RBR-FNDN-1-(i-B-iii) : Earthwork in excavation for structures as per drawing and technical specifications Cla
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 5
and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Ordinary Soils-Mechcanical Means-above 6 m depth

out put

a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)

180

0 Nos.
8.32 Nos.

b) Machinery
Hydraulic Excavator - (Hire charges R & B- S.N.4)

6 hours
Sub total

c&d) Overheads & Contractors Profit


14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
VAT & labour cess
#REF!
Rate per 1 Cum excluding Dewatering
RBR-FNDN-1 - B -III - Earthwork in excavation for structures as per drawing and technical specifications Cl
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 5
and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Blocks and Man Holes etc,.Hard rock (requiring blasting) - Upto 3 m depth
Hard rock (requiring blasting)-Upto 3 m depth
a)Labour
Mate ( Labour- R&B-S.N.71)
Driller (labour R&B- S.N.31)
Blaster (labour R&B- S.N.14)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers ( Hire
charges- Irrigation-S.N.3)
c) Materials
Gelatin 80 per cent -( M-104 -Irrigation SSR )
Electric Detonators @ 1 detonator for 2 gelatine sticks of 285 gm
each -(M-094 -Irrigation SSR)
Sub total
d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
Cost for 1 cum
VAT & labour cess

out put

10

0 Nos.
0.50 Nos.
0.25 Nos.
8.35 Nos.

1 hours

3.50 Kg
14 Nos.

14%

#REF!

Rate per 1 Cum excluding Dewatering


6

Excavation in Hard rock (blasting prohibited) Upto 3 m depth including 1.5 m depth in hard rock : Earthwork e
sheet rock and boulders in habitant areas where conventional blasting can not be done for foundations, including all
etc., complete.
out put 10.00
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers ( Hire
charges- Irrigation-S.N.3)
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
337269598.xlsx data-Intake well -sinking

0.00 Nos
5.20 Nos

6 hour

14%

Page 2610 of 3205

Rate per cum = a+b+c+d+e)/10


VAT & labour cess
Rate per 1 Cum excluding Dewatering

337269598.xlsx data-Intake well -sinking

#REF!

Page 2611 of 3205

Carting of surplus excavated rock from the site to a distance suitable including loading, unloading charges, cos
charges, all leads & lifts and other incidental and operational charges etc., complete.

Rock/CC
Page No.328 of SSR,Conveyance rates- 5.00 Km
VAT & labour cess

1 Cum
#REF!
Rate per 1 Cum

Earth
Page No.124 of SSR,Conveyance rates- 5.00 Km
VAT & labour cess

1 Cum
#REF!
Rate per 1 Cum

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundation
layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and co
all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 3
Out put
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)

6.00
0.00 Nos
0.31 Nos

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess

14%

#REF!
Rate per 1 Cum

BLD-CSTN-2-9 (17) : Filling with Sand in trenches, sides of foundations and basement with initial lead in la
consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site an
charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Out put

6.00

Cost of Sand
a)Labour
Mate ( Labour- R&B-S.N.71)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)

6.00 Cum

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Rate per cum = (a+b+c)/6
VAT & labour cess

14%

0.00 Nos
0.31 Nos

#REF!
Rate per 1 Cum

10

Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges an
complete,
Basic rate (as per item No.26/(a) of the SSR (PH items)
Total
Overheads & Contractors Profit

1 Hp.hr
14%

VAT & labour cess

#REF!
Rate per 1HPhr

337269598.xlsx data-Intake well -sinking

Page 2612 of 3205

11

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nomina
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance
coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, co
finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under floo
Unit : 1cum
A. MATERIALS:
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)
Coarse aggregate 40mm graded ( as per Lead statement)
Fine aggregate (Sand) ( Lead statement-S.N.2 )
Water (including for curing) -M-189- SSR- irrigation items
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire chargesIrrigation- S.N.16)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

1 hour

C. LABOUR:
Mason 1st class(labour-Irrigation.S.N.11)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)

0.10 Nos
1.39 Nos

Total
c&d) Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum up to 3.00m initial depth below GL

Rate for Extra Delifts


Rate per 3 to 4.00 m depth from GL
Basic Rate of CC (1:5:10)
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every 1
m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per the item no.33.(b) of the PH SSR, 50% of the
Lift charges.
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate ( i.e. 5% on Labour charges )
Total
c&d) Overheads & Contractors Profit

#REF!

1.00 Cum

1 delifts

5%

14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 3 to 4.00 m depth below GL
b

#REF!

Rate per 4.00 to 5.00 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
2 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 4 to 5.00 m depth from GL

337269598.xlsx data-Intake well -sinking

#REF!

Page 2613 of 3205

Rate per 5.00 to 6.00 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
3 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 5 to 6 m depth below GL
d

#REF!

Rate per 6 to 7 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
4 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 6 to 7 m depth below GL
e

#REF!

Rate per 7 to 8 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
5 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 7 to 8 m depth below GL
f

#REF!

Rate per 8 to 9 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
6 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 8 to 9.00 m depth below GL
g

#REF!

Rate per 9 to 10 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
7 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 9 to 10 m depth below GL
h

#REF!

Rate per 10.00 to 11.00 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
8 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 1 Cum 10 to 11 m depth below GL

337269598.xlsx data-Intake well -sinking

Page 2614 of 3205

Rate per 11.00 to 12.00 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
9 delifts
5%
14%
Rate per cu.m.

Rate per cu.m.

#REF!

Rate per 1 Cum 11 to 12 m depth below GL


j

Rate per 12.00 to 13.00 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
10 delifts
5%
14%
Rate per cu.m.

Rate per cu.m.

#REF!

Rate per 1 Cum 12 to 13 m depth below GL


k

Rate per 13.00 to 14.00 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
11 delifts
5%
14%
Rate per cu.m.

Rate per cu.m.

#REF!

Rate per 1 Cum 13 to 14 m depth below GL


l

Rate per 14.00 to 15.00 m depth below GL


Basic Rate of CC (1:5:10)
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
12 delifts
5%
14%
Rate per cu.m.

Rate per cu.m.

#REF!

Rate per 1 Cum 14 to 15 m depth below GL


12

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIG
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conve
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other ta
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,co
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS co
PEDESTALS (Below Plinth)
M-30 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

400.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)

0.133 Nos.
0.267 Nos.
4.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
337269598.xlsx data-Intake well -sinking

1.333 hour

Page 2615 of 3205

Vibrator hire charges ( Hire -irrigation -41)

1.333 hour

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum

337269598.xlsx data-Intake well -sinking

1.20 Kl

Page 2616 of 3205

Base slab and Haunches and Toe


R.C.C. M 30 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00
1.00
1.00
20%

Overheads & Contractors Profit

14%

Cum
Cum
Cum

Total
VAT & labour cess
Rate per 1 Cum up to 3.00m initial depth from GL

#REF!

Rate for Extra Delifts


Rate per 3 to 4.00 m depth below GL
Basic Rate of RCC-M30
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every 1
m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per the item no.33.(b) of the PH SSR, 50% of the
Lift charges.
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate ( i.e. 5% on Labour charges )
Total
c &d) Overheads & Contractors Profit

1.00 Cum

1 delifts

5%

14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 3 to 4 m depth below GL
c

#REF!

Rate per 4 to 5 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
2 delifts
5%

Rate per cu.m.


VAT & labour cess
Rate per 1 Cum 4 to 5 m depth below GL
d

#REF!

Rate per 5.00 to 6.00 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
3 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 5 to 6 m depth from GL
e

#REF!

Rate per 6 to 7 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
4 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 6 to 7 m depth below GL
337269598.xlsx data-Intake well -sinking

#REF!

Page 2617 of 3205

Rate per 7 to 8 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
5 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 7 to 8 m depth below GL
g

#REF!

Rate per 8 to 9 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
6 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 8.00 to 9.00 m depth below GL
h

#REF!

Rate per 9.00 to 10.00 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
7 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 9 to 10.00 m depth below GL
i

Rate per 10.00 to 11.00 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit
Rate per cu.m.
VAT & labour cess

#REF!

1.00 Cum
8 delifts
5%
14%
#REF!

Rate per 1 Cum 10 to 11.00 m depth below GL


j

Rate per 11.00 to 12.00 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit
Rate per cu.m.
VAT & labour cess
Rate per 1 Cum 11 to 12.00 m depth below GL
Rate per 12.00 to 13.00 m depth below GL
Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit
Rate per cu.m.
VAT & labour cess
Rate per 1 Cum 12 to 13.00 m depth below GL

337269598.xlsx data-Intake well -sinking

1.00 Cum
9 delifts
5%
14%
#REF!

1.00 Cum
10 delifts
5%
14%
#REF!

Page 2618 of 3205

13

Rate per 13.00 to 14.00 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit
Rate per cu.m.
VAT & labour cess
Rate per 1 Cum 13 to 14.00 m depth below GL

1.00 Cum
11 delifts
5%
14%
#REF!

Rate per 14.00 to 15.00 m depth below GL


Basic Rate of RCC-M30
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit
Rate per cu.m.
VAT & labour cess
Rate per 1 Cum 14 to 15.00 m depth below GL

1.00 Cum
12 delifts
5%
14%
#REF!

BLD-CSTN-3-14-(31)-B : Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIG
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conve
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other ta
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,co
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code
TANKS, RCC WALLS IN BUILDINGS
M-30 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

400.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.167 Nos.
0.167 Nos.
5.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)

1.333 hour

Vibrator hire charges ( Hire -irrigation -41)

1.333 hour

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum
i

Vertical walls of circular faces for Intake well

Circular walls up to 3.00m Height & Thickness of

1.20 Kl

450 mm

M-30 GRADE OF MIX


Centering charges for RCC vertical walls of circular faces up to 3 m
height.( 30% extra over Plain wall rate - PH SSR - 31-b.5-Pg.340 of
Bld.SSR)

1.00
2.22

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum up to 3.00m height above G.L


337269598.xlsx data-Intake well -sinking

Cum
Sqm

Page 2619 of 3205

337269598.xlsx data-Intake well -sinking

Page 2620 of 3205

ii
a

Vertical walls of circular faces for Intake well with extra lifts above Ground Level
Rate per 3 m to 4.00m height above GL
M-30 GRADE OF MIX
Centering charges for RCC vertical walls of circular faces up to 3 m
height.( 30% extra over Plain wall rate - PH SSR - 31-b.5-Pg.340 of
Bld.SSR)
lifting of Cement Concrete for RCC elevated reservoir for every 1m
height or part thereof over the initial lift of 3m ( item 32. a. of PH SSR
- adopt as per Bld. SSR i.e. 10% on labour charges )

Overheads & Contractors Profit

450 mm
1.00 Cum
2.22
Sqm

1 lifts

10%

14%
Total

VAT & labour cess

#REF!

Rate per One Cum at 4.00m height above G.L


b

Rate per 4.00 to 5.00 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
2 lifts
10%

Rate per cu.m.


VAT & labour cess

#REF!

Rate per 4.00 to 5.00 m height above GL per 1 Cum

Rate per 5.00 to 6.00 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
3 lifts
10%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 5.00 to 6.00 m height above GL per 1 Cum

Rate per 6.00 to 7.00 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
4 lifts
10%
14%
Rate per cu.m.

VAT & labour cess


Rate per 6.00 to 7.00 m height above GL per 1 Cum

Rate per 7 to 8 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

#REF!

1.00 Cum
5 lifts
10%
14%
Rate per cu.m.

VAT & labour cess


Rate per 7 to 8 m height above GL per 1 Cum
f

Rate per 8 to 9 m height above GL


337269598.xlsx data-Intake well -sinking

#REF!

Page 2621 of 3205

M-30 GRADE OF MIX


Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
6 lifts
10%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 8 to 9 m height above GL per 1 Cum

337269598.xlsx data-Intake well -sinking

Page 2622 of 3205

Rate per 9 to 10 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
7 lifts
10%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 9 to 10 m height above GL per 1 Cum


h

Rate per 10 to 11m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
8 lifts
10%
14%
Rate per cu.m.

VAT & labour cess


Rate per 10 to 11m height above GL per 1 Cum
i

#REF!

Rate per 11 to 12 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
9 lifts
10%
14%
Rate per cu.m.

VAT & labour cess


Rate per 11 to 12 m height above GL per 1 Cum

#REF!

Rate per 12 to 13 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
10 lifts
10%
14%
Rate per cu.m.

VAT & labour cess


Rate per 12 to 13 m height above GL per 1 Cum

#REF!

Rate per 13 to 14 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
11 lifts
10%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 13 to 14 m height above GL per 1 Cum

Rate per 14 to 15 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
12 lifts
10%
14%
Rate per cu.m.

VAT & labour cess


Rate per 14 to 15 m height above GL per 1 Cum

337269598.xlsx data-Intake well -sinking

#REF!

Page 2623 of 3205

337269598.xlsx data-Intake well -sinking

Page 2624 of 3205

iii

Rate for Delifts

Vertical walls of circular faces for Intake well with extra delifts below Ground Levels
Rate per GL to 3 m depth below GL
450 mm
M-30 GRADE OF MIX
Centering charges for RCC vertical walls of circular faces up to 3 m
height.( 30% extra over Plain wall rate - PH SSR - 32-b.5)

1.00 Cum
2.22 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


I
a

Rate for Extra Delifts


Rate per 3 to 4.00 m depth below GL
M-30 GRADE OF MIX
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every 1
m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per the item no.33.(b) of the PH SSR, 50% of the
Lift charges.
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate ( i.e. 5% on Labour charges )
Total
c&d) Overheads & Contractors Profit

450 mm
1.00 Cum

1 delifts

5%

14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 1 Cum 3 to 4.00 m depth below GL


b

Rate per 4.00 to 5.00 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
2 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 4.00 to 5.00 m depth below GL per 1 Cum

#REF!

Rate per 5.00 to 6.00 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
3 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 5.00 to 6.00 m depth below GL per 1 Cum

Rate per 6 to 7.00 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
337269598.xlsx data-Intake well -sinking

1.00 Cum
4 delifts
5%

Page 2625 of 3205

c&d) Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & labour cess


Rate per 6 to 7.00 m depth below GL per 1 Cum

337269598.xlsx data-Intake well -sinking

#REF!

Page 2626 of 3205

Rate per 7 to 8 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
5 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 7 to 8 m depth below GL per 1 Cum


f

Rate per 8 to 9 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
6 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 8 to 9 m depth below GL per 1 Cum


g

Rate per 9 to 10 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
7 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 9 to 10 m depth below GL per 1 Cum
h

#REF!

Rate per 10 to 11 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
8 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 10 to 11 m depth below GL per 1 Cum


i

Rate per 11 to 12 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
9 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 11 to 12 m depth below GL per 1 Cum


j

Rate per 12 to 13 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
10 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 12 to 13 m depth below GL per 1 Cum

337269598.xlsx data-Intake well -sinking

#REF!

Page 2627 of 3205

Rate per 13 to 14 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
11 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 13 to 14 m depth below GL per 1 Cum


l

Rate per 14 to 15 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
12 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 14 to 15 m depth below GL per 1 Cum

#REF!

Vertical walls of circular faces for Intake well


iv

Rate per GL to 3 m depth below GL

350 mm

M-30 GRADE OF MIX


Centering charges for RCC vertical walls of circular faces up to 3 m
height.( 30% extra over Plain wall rate - PH SSR - 31-b.5)

1.00 Cum
2.86 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum up to 3m height above GL

Vertical walls of circular faces for Intake well with extra lifts above Ground Level
Rate per 3 m to 4.00m height above GL
350 mm
M-30 GRADE OF MIX
1.00 Cum
lifting of Cement Concrete for RCC elevated reservoir for every 1m
1 lifts
10%
height or part thereof over the initial lift of 3m ( item 32. a. of PH SSR
- adopt as per Bld. SSr i.e. 10% on labour charges )

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum at 4.00m height above G.L


b

Rate per 4.00 to 5.00 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
2 lifts
10%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 1 Cum 4 to 5.00 m depth below GL


c

Rate per 5.00 to 6.00 m height above GL


M-30 GRADE OF MIX
Rate for lift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit
337269598.xlsx data-Intake well -sinking

1.00 Cum
3 lifts
10%
14%

Page 2628 of 3205

Rate per cu.m.


VAT & labour cess

#REF!

Rate per 1 Cum 5 to 6.00 m depth above GL

337269598.xlsx data-Intake well -sinking

Page 2629 of 3205

v
a

Rate for Extra Delifts


Rate per 3 to 4.00 m depth below GL
M-30 GRADE OF MIX
Delifting the materials such as stones, concrete etc., for concrete
below ground level for construction of masonry ground level
reservoirs, inspection wells,test wells and sump wells etc., for every 1
m depth or part thereof beyond the initial depth of 3 meters from
ground level.( as per the item no.32.(b) of the PH SSR, 50% of the
Lift charges.
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on
Ground Floor Rate ( i.e. 5% on Labour charges )
Total
c&d) Overheads & Contractors Profit

350 mm
1.00 Cum

1 delifts

5%

14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 3 to 4.00 m depth below GL
b

#REF!

Rate per 4.00 to 5.00 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
2 delifts
5%

Rate per cu.m.


VAT & labour cess

#REF!

Rate per 1 Cum 4 to 5.00 m depth below GL


c

Rate per 5.00 to 6.00 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
3 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 1 Cum 5 to 6.00 m depth below GL


d

Rate per 6 to 7.00 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
4 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 6 to 7 m depth below GL
e

#REF!

Rate per 7 to 8 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
5 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 7 to 8 m depth below GL

337269598.xlsx data-Intake well -sinking

#REF!

Page 2630 of 3205

Rate per 8 to 9 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
6 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 8 to 9 m depth below GL
g

#REF!

Rate per 9 to 10 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
7 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 9 to 10 m depth below GL
h

#REF!

Rate per 10 to 11 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
8 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 10 to 11 m depth below GL
i

#REF!

Rate per 11 to 12 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
9 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 11 to 12 m depth below GL
j

#REF!

Rate per 12 to 13 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
10 delifts
5%
14%
Rate per cu.m.

VAT & labour cess

#REF!

Rate per 1 Cum 12 to 13 m depth below GL


k

Rate per 13 to 14 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
Total
c&d) Overheads & Contractors Profit

1.00 Cum
11 delifts
5%
14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 13 to 14 m depth below GL
l

Rate per 14 to 15 m depth below GL


M-30 GRADE OF MIX
Rate for Delift of Material per every 1.00m
337269598.xlsx data-Intake well -sinking

#REF!

1.00 Cum
12 delifts
5%

Page 2631 of 3205

Total
c&d) Overheads & Contractors Profit

14%
Rate per cu.m.

VAT & labour cess


Rate per 1 Cum 14 to 15m depth below GL

337269598.xlsx data-Intake well -sinking

#REF!

Page 2632 of 3205

14

BLD-CSTN-3-14-(31)-C: Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIG
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conve
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other ta
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,co
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code fro
the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but exclud
charges for finished item of work. for RCC SLABS, BEAMS
M-30 GRADE OF MIX
Mateial
cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

400.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.067 No
0.133 No
3.077 No

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19Concrete
mixer)
Vibrator hire charges
( Hire -irrigation
-41)

0.308 hour
0.308 hour

Water (including for curing) -M-189- SSR- irrigation items

1.200 Kl

BASIC COST per 1 cum


A

RCC M 30 Slabs up to 3.66 Mts height

RCC M 30 Slabs up to 3.66m Height & Thickness of

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
6.670 Sqm
6.670 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
b

#REF!

RCC M 30 Slabs up to 3.66m Height & Thickness of


Cost of M- 30 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

200 mm
1.00 Cum
5.000 Sqmt.
5.000 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum

#REF!

RCC M 30 Slabs up to 7.32Mts height

RCC M 30 Slabs up to 7.32m Height & Thickness of


Cost of M- 30 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
337269598.xlsx data-Intake well -sinking

150 mm
1.000 Cum
6.670 Sqm
6.670 Sqm

Page 2633 of 3205

Add Labour component @

20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum

#REF!

337269598.xlsx data-Intake well -sinking

Page 2634 of 3205

RCC M 30 Slabs up to 7.32m Height & Thickness of

200 mm

Cost of M- 30 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
5.000 Sqmt.
5.000 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


C

RCC M 30 Slabs up to 15.00 Mts height

RCC M 30 Slabs up to 15.00m Height & Thickness of

150 mm

Cost of M- 30 grade mix


Centering charges ,Pg No.340,31.a (ELSR ) up to 15m

1.000 Cum
6.670 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


b

RCC M 30 Slabs up to 15.00m Height & Thickness of

200 mm

Cost of M- 30 grade mix


Centering charges ,Pg No.240,31.a (ELSR )

1.00 Cum
5.000 Sqmt.

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


15

BLD-CSTN-3-14-(31)-A: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIG
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conve
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other ta
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,co
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS co
PEDESTALS (Below Plinth)
M-30 GRADE OF MIX
Material
cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

350.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.133 Nos.
0.267 Nos.
4.600 Nos.

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
337269598.xlsx data-Intake well -sinking

1.333 hour
1.333 hour

Page 2635 of 3205

Water (including for curing) -M-189- SSR- irrigation items


BASIC COST per 1 cum

337269598.xlsx data-Intake well -sinking

1.20 Kl

Page 2636 of 3205

for Footings
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00
1.00
1.00
20%

Overheads & Contractors Profit

14%

VAT & labour cess

Cum
Cum
Cum

#REF!

Rate per 1 Cum


b

Pedastals
R.C.C. M 25 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%

VAT & labour cess


Rate per One Cum
c

#REF!

Plinth beams
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%

VAT & labour cess

#REF!
Total

Rate per One Cum


16

BLD-CSTN-3-14-(31)-B: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIG
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conve
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other ta
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,co
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code
TANKS, RCC WALLS IN BUILDINGS
M-20 GRADE OF MIX
Mateial
cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

350.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.167 Nos.
0.167 Nos.
5.600 Nos.

Machinary
337269598.xlsx data-Intake well -sinking

Page 2637 of 3205

Weigh Batcher Hire charges (Machine mixing) charges ( Hire


-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items
BASIC COST per 1 cum

337269598.xlsx data-Intake well -sinking

1.333 hour
1.333 hour
1.20 Kl

Page 2638 of 3205

Columns up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Material charges for Centering & Scaffolding, Pg No. 106 to 108 of
Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 106 to 108 of
Bld. Items
Add Labour component @
Basic Cost
Overheads & Contractors Profit
VAT & labour cess

1.00 Cum
1.00 Cum
1.00 Cum
20%
14%
#REF!

Rate per One Cum


b

Columns 4.00m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 28% on Centering Charges i.e
Add 28% on Labour Charges i.e

1.00 Cum
0.557 16.67%
341.00
1603.00

VAT & labour cess

#REF!

Rate per One Cum for 4.00m height


c

Columns 5.00m unsupported height above GL


Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 28% on Centering Charges i.e
Add 28% on Labour Charges i.e

341.00
1603.00

VAT & labour cess


Rate per One Cum for 5.00m height
d

1.00 Cum
2.197 16.67%

#REF!

Columns 7.32m unsupported height above GL


Rate per One Cum for 3.66m height
Material charges for Centering & Scaffolding, Pg No. 106 to 108 of
Bld. Items (Steel scaffolding)
Labour charges for Centering & Scaffolding,Pg No. 106 to 108 of
Bld. Items
Add Labour component @
VAT & labour cess

1.00 Cum
1.00 Cum
1.00 Cum
20%
#REF!

Rate per One Cum for 7.32m height


e

Columns up to 15.00 m.

0.60

0.60

R.C.C. M 20 Per Cum

1.00 Cum

Centering charges ,Pg No.340 of Bld.SSR for ELSRs

6.67 Sqm
Basic Cost

Overheads & Contractors Profit


VAT & labour cess

14%
#REF!

Rate per One Cum

Rate for extra Heights


337269598.xlsx data-Intake well -sinking

Page 2639 of 3205

Columns from 15.00 m. to 18.00m

0.60

0.6

R.C.C. M 20 Per Cum

1.00 Cum

Centering charges ,Pg No.340 of Bld.SSR for ELSRs

6.67 sqm

Add for extra height

9%
Basic Cost

Overheads & Contractors Profit @ 14%

14.00%

VAT & labour cess


Rate per One Cum
g

#REF!

Lintels up to 3.66 Mts unsupported height above GL


R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%

VAT & labour cess

#REF!
Total

Rate per One Cum


17

BLD-CSTN-3-14-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIG
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conve
fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other ta
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,co
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code fro
the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but exclud
charges for finished item of work. for RCC SLABS, BEAMS

M-20 GRADE OF MIX


Mateial
cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

350.00 Kg

20mm HBG graded metal (Lead statement-S.N.47)


Sand ( Lead statement-S.N.2 )

0.800 Cum
0.400 Cum

Labour
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Both Men & Women) (Labour-Irrigation-Unskilled-S.N.3)

0.067 No
0.133 No
3.077 No

Machinary
Weigh Batcher Hire charges (Machine mixing) charges ( Hire
-Irrigation-S.N.19- Concrete mixer)
Vibrator hire charges ( Hire -irrigation -41)
Water (including for curing) -M-189- SSR- irrigation items
BASIC COST per 1 cum

337269598.xlsx data-Intake well -sinking

0.308 hour
0.308 hour
1.200 Kl

Page 2640 of 3205

I
A

RCC Slabs for Pump Room at 5.00m height


RCC M 20 Slabs up to 3.66 Mts height

RCC M 20 Slabs up to 3.66m Height & Thickness of

120 mm

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
8.330 Sqm
8.330 Sqm
20%

Overheads & Contractors Profit


Total
VAT & labour cess

#REF!

Rate per One Cum for 3.66m height


b

RCC M 20 Slabs up to 3.66m Height & Thickness of

125 mm

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
8.000 Sqm
8.000 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum for 3.66m height


c

RCC M 20 Slabs at 4.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 37% on Centering Charges i.e
Add 37% on Labour Charges i.e
Sub - Total
VAT & labour cess
Rate per One Cum for 4.00m height

RCC M 20 Slabs at 5.00 Mts height


Rate for 5.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 37% on Centering Charges i.e
Add 37% on Labour Charges i.e
Sub - Total
VAT & labour cess

0.56 16.666%
227.00
152.00
#REF!

2.20 16.666%
#REF!
227.00
#REF!

Rate per One Cum for 5.00m height


e

RCC M 20 Slabs at 5.00 Mts height


Rate for 5.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 37% on Centering Charges i.e
Add 37% on Labour Charges i.e
Sub - Total
VAT & labour cess
Rate per One Cum for 5.00m height
337269598.xlsx data-Intake well -sinking

2.20 16.666%
0.00
0.00
#REF!

Page 2641 of 3205

RCC M 20 Slabs up to 3.66m Height & Thickness of

175 mm

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
5.710 Sqm
5.710 Sqm
20%

Overheads & Contractors Profit


Total
VAT & labour cess

#REF!

Rate per One Cum for 3.66m height


g

RCC M 20 Slabs at 4.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 37% on Centering Charges i.e
Add 37% on Labour Charges i.e
Sub - Total
VAT & labour cess

0.56 16.666%
227.00
152.00
#REF!

Rate per One Cum for 4.00m height


B

RCC M 20 Slabs up to 7.32Mts height

RCC M 20 Slabs up to 7.32m Height & Thickness of

150 mm

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
6.670 Sqm
6.670 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
b

#REF!

RCC M 20 Slabs up to 7.32m Height & Thickness of

200 mm

Cost of M- 20 grade mix


Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
5.000 Sqmt.
5.000 Sqm
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


C

RCC M 20 Slabs up to 15.00 Mts height

RCC M 20 Slabs up to 15.00m Height & Thickness of


Cost of M- 20 grade mix
Centering charges ,Pg No.340,31.a (ELSR ) up to 15m

300 mm
1.000 Cum
3.330 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


337269598.xlsx data-Intake well -sinking

Page 2642 of 3205

RCC M 20 Slabs at 18.00m Height & Thickness of

300 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

1.000 Cum
3.330 Sqm

Centering charges ,Pg No.240,31.a- 15m to 18m

9%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
c

#REF!

RCC M 20 Slabs at 20.00m Height & Thickness of

300 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

1.000 Cum
3.330 Sqm

Centering charges ,Pg No.240,31.a- 18m to 21m

15%

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


D

RCC M 20 Slabs up to 15.00 Mts height

RCC M 20 Slabs up to 15.00m Height & Thickness of


Cost of M- 20 grade mix
Centering charges ,Pg No.340,31.a (ELSR ) up to 15m

120 mm
1.000 Cum
8.330 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
b

#REF!

RCC M 20 Slabs at 18.00m Height & Thickness of

120 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

1.000 Cum
8.330 Sqm

Centering charges ,Pg No.240,31.a- 15m to 18m

9%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
c

#REF!

RCC M 20 Slabs at 20.00m Height & Thickness of

120 mm

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

1.000 Cum
8.330 Sqm

Centering charges ,Pg No.240,31.a- 18m to 21m

15%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
a

#REF!

RCC M 20 Slabs up to 15.00m Height & Thickness of


337269598.xlsx data-Intake well -sinking

175 mm

Page 2643 of 3205

Cost of M- 20 grade mix


Centering charges ,Pg No.240,31.a (ELSR ) up to 15m

1.000 Cum
5.710 Sqm

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum

#REF!

337269598.xlsx data-Intake well -sinking

Page 2644 of 3205

II
a

RCC Dome Slab


RCC M 20 Dome Slab up to 3.66m Height
Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
b

#REF!

RCC M 20 Dome Slab up to 7.32m Height


Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


III
A

RCC Beams
RCC M 20 Beams up to 3.66m Height
Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess

#REF!

Rate per One Cum


b

RCC M 20 Beams up to 4.00 Mts height


Rate for 4.00m Height
Rate per One Cum for 3.66m height
Add for extra height at 16.666% on every 0.610m height above 3.66m
Add 0.09 on Centering Charges i.e
Add 0.09 on Centering Charges i.e

2002.00
1344.00

VAT & labour cess


Rate per One Cum for 5.00m height
B

0.56 16.666%

#REF!

RCC M 20 Beams up to 7.32m Height


Cost of M- 20 grade mix
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
1.000 Cum
1.000 Cum
20%

Overheads & Contractors Profit

14%
Total

VAT & labour cess


Rate per One Cum
C

#REF!

RCC M 20 Beams up to 10.00 m Height


Rate per One Cum for 7.32 m height
337269598.xlsx data-Intake well -sinking

1.000 Cum

Page 2645 of 3205

Add for extra height at 16.666% on every 0.610m height above 7.32m
Add 0.09 on Centering Charges i.e
Add Labour component @

4.39 16.666%
3607.00
2127.00
#REF!

Rate per One Cum

337269598.xlsx data-Intake well -sinking

Page 2646 of 3205

RCC M 20 Beams up to 12.50 m Height


Rate per One Cum for 7.32 m height
Add for extra height at 16.666% on every 0.610m height above 7.32m
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

1.000 Cum
8.49 16.666%
3607.00
2127.00
#REF!

Rate per One Cum


E

0.23

RCC M 20 Beams at 15m Height


Cost of M- 20 grade mix

0.60
1.00 Cum

Centering charges for Columns and Beams ,Pg No.301 for ELSRs

12.04 sqm

Basic Cost
Overheads & Contractors Profit @ 14%

14.00%

VAT & labour cess


Rate per One Cum
F

#REF!

RCC M 20 Beams from 15.00 m. to 18.00m

0.23

Rate per One Cum

0.60
1.00 Cum

Centering charges ,Pg No.340 for ELSRs

12.04 sqm

Add for extra height

9%
Basic Cost

Overheads & Contractors Profit @ 14%

14.00%

VAT & labour cess


Rate per One Cum
G

#REF!

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end
and 50mm th. at free end
R.C.C. M 20 Per Cum
Centering charges ,Pg No. 106 to 108 of Bld. Items
Labour charges,Pg No. 106 to 108 of Bld. Items
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit

14%

VAT & labour cess

#REF!
Total

Rate per One Sqm


18

BLD-CSTN-8-11-(86): RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforc
charge with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sa
operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and fo
for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh (1.0 M panna for 0.6 M drop) BMT-F.28-Pg.No.22
of Bld.SSR.
Cement Mortar 1:3 for 25 mm thick (Mortars-" d ")
Dry Cement for making Lumps
337269598.xlsx data-Intake well -sinking

13.30 sqm
0.25 cum
50.00 kg

Page 2647 of 3205

12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides Excluding HYSD


Steel/ Mild steel & Binding wire
B) LABOUR CHARGES
Mason 1st class (labour-Irrigation.S.N.11)
Miller Operator (labour-Irrigation.S.N.16)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)
c) Machinery
Machine Mixing Mortar with Miller - (Hire charges -Irrigation-S.No.16)
Total
over heads & contractors profit
Grand Total for 10 Sqm
Rate per 1 sqm
VAT & labour cess

21.80 sqm

8.00 day
1.00 day
10.00 day

2.00 Hrs

14%

#REF!
Rate per 1 Sqm

337269598.xlsx data-Intake well -sinking

Page 2648 of 3205

19

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) using Sulphate Resistant Cementm f
conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all ope
etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ")
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Unskilled) ( Labour-Irrigation-Unskilled-S.N.3)
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & labour cess
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum

0.150 Cum
0.600 Nos
0.960 Nos

14%
#REF!
1F
#REF!

#REF!

9.90

9.90

Labour Charges for Scaffolding (Pg.No.108-Bld.SSR)

58.70

83.00

Add extra over Labour component

11.74

16.60

Material Hire Charges for Scaffolding (Pg.No.108-Bld.SSR)

For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
20

2F

29.35
#REF!

#REF!

BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4
sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage
charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where
finished item of work of uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

43.00 Kg

Sand ( Lead statement-S.N.2 )


Top Coat in CM(1:4), 4 mm thick
cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

0.18 Cum
14.50 Kg

Sand ( Lead statement-S.N.2 )

0.04 Cum

B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
2nd Class Mason (labour-Irrigation.S.N.35)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Total
C.Overheads & Contractors Profit
VAT & labour cess
Rate per 10 Sqm

0.63 day
1.47 day
3.90 day
14%
#REF!

Rate for other Floors

1F

Basic rate per 1Cum

2F

#REF!

#REF!

9.90

9.90

Labour Charges for Scaffolding (Pg.108 of Bld.SSR)

58.70

83.00

Add extra over Labour component

11.74

16.60

Material Hire Charges for Scaffolding (Pg.108 of Bld.SSR)

337269598.xlsx data-Intake well -sinking

Page 2649 of 3205

For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total

337269598.xlsx data-Intake well -sinking

29.35
#REF!

#REF!

Page 2650 of 3205

21

BLD-CSTN-8-8-(83) ; Plastering with 20mm thick in single coat in CM (1:3) finished smooth including cost and co
seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges et
ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3) (Mortars-" d ")
B. LABOUR:
Mason 1st class (labour-Irrigation.S.N.11)
Mazdoor (Labour-Irrigation-Unskilled-S.N.3)
Total A+B
C.Overheads & Contractors Profit
Grand Total
VAT & labour cess
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding (Pg.108 of Bld.SSR)
Labour Charges for Scaffolding (Pg.108 of Bld.SSR)
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total

22

0.94 Nos
0.16 Nos
14%
#REF!
1F

2F

#REF!
9.90
58.70
11.74

#REF!
9.90
58.70
11.74
29.35

#REF!

#REF!

BLD-CSTN-10-25-(148) ; Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick wit
bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding con
including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread linin
wall and slab etc,, complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3
Water proof compound
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Total
over heads & contractors profit
Total cost for 10 sqm
VAT & labour cess
Rate per 10 Sqm

23

0.21 Cum

0.210 Nos
2.000 Kg
0.660 Nos
1.540 Nos
3.70 Nos
14%
#REF!

BLD-CSTN-4-1-(34) : Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild
500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cut
shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, includin
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, op
cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finishe
No.126
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire- M-072- SSR (Irrigation)
(b) Labour for cutting, bending, shifting to site, tying and placing
in position
Blacksmith / Bar bender
Mazdoor (Unskilled)
337269598.xlsx data-Intake well -sinking

1.05 Ton
6.00 kg

10.00 No
10.00 No

Page 2651 of 3205

(d) Contractors profit on (a+b+c)


Rate per t = a+b+c+d
VAT & labour cess
Rate per One MT
Rate per One Kg

337269598.xlsx data-Intake well -sinking

14%
#REF!

Page 2652 of 3205

24

Suply, delivery and fixing of C.I. heavy weight manhole frame and cover in the roof slab incuding labour charge
operational charges as directed by the Engineer in Charge..
Weight of C.I. heavy weight manhole frame and cover 90 Kg each( 2
x 90 ) = 180 Kg- rate as per CI specials vide This data book

1 Kg

Total
Cost of Man hole frame in Kg
25

Manufacturing, supply and erection of 600 mm width ladders with 50X50X6 mm MS angles 2 nos verticals and ho
aprooved drawing and as directed by the departmental officers and painting both sides with anti corrosive paint two c
including cost of all materials fabrication, welding transportation to site, all taxex and duties, fixing in position duly em
all other incidental and operational charges etc., complete for finished item of work.
Cost of ladder of 4.0 m
Weight of 50x50x6mm MS channels =(14.50 Rmt x 4.42 kg/Rmt =

61.05 kg

total

61.05 kg

Cost of MS channels ( Rate of steel as per ENC-(PH),memo )

61.05 kg

fabrication charges, Item-BMM-V.14-824


Hoisting and fixng in position
Painting with synthetic enamel paint aera = 17 x 0.2

61.05 kg
2.90 sqm

Rate for 4.00 Rmt


VAT & labour cess

#REF!

for 1.00 Rmt


Rate per 1.00 Rmt
Rate per 1.00 Kg
26

BLD-CSTN-9-5
White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surfac
loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charg
of work, but excluding conveyance charges of materials
Cost of White Cement
Gum, conjee water, or prickly pear juice including necessary fire wood

2.00 Kg
LS

Brick Layers / Painter


Mazdoor (unskilled)

0.21 Nos
0.32 Nos

Sundries including brushes, ladders, etc.,


over heads & contractors profit
Total cost
VAT & labour cess

1%
14%
#REF!

Rate per 10 Sqm


27

Painting with Synthetic Enamel paints - Two Coats - For New Iron Work including cost and conveyance of all ma
incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212
Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.
BMT-J.30 -item 381 of Pg-24
1st Class Painter
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
337269598.xlsx data-Intake well -sinking

1.10 Ltr
0.7 Nos.

14%

Page 2653 of 3205

Total cost for 10 sqm


VAT & labour cess

#REF!

Rate per 10 Sqm

337269598.xlsx data-Intake well -sinking

Page 2654 of 3205

28

IRR-DAW-2-12: Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N
using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labou
cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC ornament
20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height a
cm thick and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping chamferred or ro
( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Ceme
of super plasticiser(0.4% by wt. of cement, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum)

Unit
A. MATERIALS:
Cement mix
Cenent for incidentals @ 5 kg / cum
Coarse aggregate 20-10 mm
Coarse aggregate 10-4.75 mm
Fine aggregate ( screened )
Super plasticiser - BMT-H.14
Use rate of shuttering
Scaffolding of shuttering @
Sundries
B. MACHINERY:
Concrete mixer 300 / 200 ltr ( ele
Needle vibrator 40 mm ( ele )
10 hp pump ( ele )
C. LABOUR:
Mason Class-I
work inspector
mazdoor
for batching cement ( cement handling )
for batching other materials
for loading mortar pans
for laying & packing concrete
for conveying concrete
for curing & miscellaneous
Labour for shuttering
Labour for scaffolding @
Total of A+B+C
D. Add for contractor's profit and overheads on (A+B+C)
Total cost for cum 1854.81
VAT & labour cess

2450 kg
35.00 kg
3.64 cum
1.96 cum
3.08 cum
9.80 kg
115.00 sqm
15%
2.00 LS

8.00 Hour
8.00 Hour
0.50 Hour

2.00 Day
1.00 Day
2.00 Day
9.00 Day
4.00 Day
2.00 Day
7.00 Day
2.00 Day
115.00 sqm
15%

14%

#REF!

Rate per 1 Rmt

337269598.xlsx data-Intake well -sinking

36

Page 2655 of 3205

29

RBR-SPST-8: Providing fitting and fixing mild steel railing complete as per drawing and technical specifications Cla
MORTH.
Unit = Running m
Taking output = 100 m (2 x 50 m span)
(a) Material
IS MC 100=2.806x1.05=2.946 t
MS Flats = 0.964x1.05 =1.012 t
MS bars = 0.17x1.05=0.18 t
MS bolts, nuts and washers
(b) Labour
Mate
Blacksmith
Mazdoor (Unskilled)
(c) Add 5 per cent of (a) for painting one shop coat with red oxide
primer and three coats of synthetic enamel paint and consumables to
safeguard against weathering and corrosion.
(d) Add for cost of concrete for fixing vertical post in the preformed
recess @ 1 per cent of (a)
(e) Add for electricity charges, welding and drilling equipment,
electrodes and other consumables @ 1 per cent of (a)

100 m
2.946 t
1.01 t
0.18 t
150.00 kg
- day
30.00 day
42.80 day
5.00%

1.00%
1.00%

f&g) Overheads & Contractors Profit


14%
Cost for 100 m = (a+b+c+d+e+f+g)
Rate per m = (a+b+c+d+e+f+g)/100
Mandatory provisions like VAT,labour cess. Price escalation, and
#REF!
Contingencies
etc,.
Rate per Rmt
Note : A typical drawing for MS railing has been followed for estimate purpose. Rate may be worked out as per desig
followed
30

Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour c
postion etc,. Complete.
Cost of Mild Steel, structural steel, i.e. Angles,channels and "I"
sections
Transportation of material for 20.00Km lead
Labour charges for fabrication
Labour charges for fixing
over heads & contractors profit

1 Kg
1 Kg
1 Kg
1 Kg
14%

VAT & labour cess

#REF!

Rate per 1 Kg
40

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement M
conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materia
mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

moulded size 23x11x7 Cm - (1:6)

A. MATERIALS:

Cement
Bricks traditional size 23 x 11 x 7 cms 2nd class
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
337269598.xlsx data-Intake well -sinking

48.00 Kg
512 Nos
0.20 Cum
0.24 day.
0.56 day.
1.89 day.

Ground moulded size 23x11

Page 2656 of 3205

Total A+B
c.Overheads & Contractors Profit
VAT & labour cess

14%
#REF!

Grand Total
Rate per One Cum

337269598.xlsx data-Intake well -sinking

Page 2657 of 3205

Rate for other Floors

1F

Basic rate per 1Cum


Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Rate per One Cum
41

2F

#REF!

#REF!

43.17

43.17

255.04

361.00

51.01

72.20
127.52

#REF!

#REF!

Supply and fixing in position of Casuarina Balli Props of size - 4" to 8" dia - 20'-0" Height including fixing in required
up to a depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
BMC-X.06 : Basic cost Sl.No 964 of Pg No.90
Add labour charges @ 20% of the balli cost
Add for Nylon ropes etc @ 5%

1 No

Rate per 1 No
42

Supply and fixing in position of Casuarina Balli Props - 3" to 4" dia - 12'-0" Height including fixing in required positio
depth of 1/4th length of the balli and tying with nylon ropes etc etc, complete
BMC-X.07 : Basic cost Sl.No 964 of Pg No.90
Add labour charges @ 20% of the balli cost
Add for Nylon ropes etc @ 5%

1 No

Rate per 1 No
43

Providind sand bags for filling in side the coffer dam


Assuming 30 bags of sand makes 1 Cum of Bund
Filling and Laying in position of Sand Bags in the stipulated places
including cost of empty cement bag, sand, thread, stiching charges
and labour charges with 14%overhead charges and contractors
profits - Irrigation SSR - under Miscellaneous Items

30 bags

Rate per 1 Cum


c.Overheads & Contractors Profit
VAT & labour cess
Total for 1 Cum

0%
#REF!

44

Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long cold twisted deformed steel Anchor rod
hole drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials, mach
hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.

Unit - 10 Nos

16 mm dia

A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 1.50m length

23.70 Kg

Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141 Pg


No. 19

10 Nos

Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg No.
19

10 Nos

B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Rate per 10 Nos
Rate per 1 Nos

0.50 day
0.50 day
1.00 day

337269598.xlsx data-Intake well -sinking

Page 2658 of 3205

VAT & Labour cess

0%
Rate per Each

337269598.xlsx data-Intake well -sinking

Page 2659 of 3205

45

Providing, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete with
for above lift, tested to 50% over load as per IS 3832 carrying ISI mark.
3 Tonne Capacity ( Rate as per Maharastra ( MJP Elec & Mech. CSR2012-13 - section -4, LF 1-3 )
Erection charges
c.Overheads & Contractors Profit
VAT & Labour cess
Grand Total
Rate per Each

1 No
1 job
14%
0%

337269598.xlsx data-Intake well -sinking

Page 2660 of 3205

SSR

cal specifications Clause 305.1 including setting out, construction


upto a lead of 50 m, dressing of sides and bottom and backfilling
/ 304 MORTH - in Ordinary soil

Cum
450.00
384.00

1 Each
1 Each

0.00
1397.76

Rs

1397.76
190.31
1588.07
158.81
#REF!
#REF!

cal specifications Clause 305.1 including setting out, construction


upto a lead of 50 m, dressing of sides and bottom and backfilling
/ 304 MORTH - in Ordinary soil

Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

#REF!

1 hours

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

d technical specifications Clause 305.1 including setting out,


and disposal upto a lead of 50 m, dressing of sides and bottom
on 305 MORD / 304 MORTH - in Ordinary soil
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

#REF!

1 hours

#REF!
#REF!
#REF!
#REF!
#REF!
337269598.xlsx data-Intake well -sinking

Page 2661 of 3205

#REF!
Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2662 of 3205

d technical specifications Clause 305.1 including setting out,


and disposal upto a lead of 50 m, dressing of sides and bottom
on 305 MORD / 304 MORTH - in Ordinary soil
Cum
450.00
384.00

1 Each
1 Each

0.00
3194.88

#REF!

1 hours

450.00
576.00
576.00
384.00

1 Each
1 Each
1 Each
1 Each

0.00
288.00
144.00
3206.40

#REF!

1 hours

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rs
#REF!
d technical specifications Clause 305.1 including setting out,
and disposal upto a lead of 50 m, dressing of sides and bottom
on 305 MORD / 304 MORTH - Ordinary Soils : for Sumps, Thrust

Cum

#REF!

1 Kg
100 Nos.

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
Rs

#REF!

th in hard rock : Earthwork excavation in hard rock such as


for foundations, including all incidental and operational charges
Cum
450.00
384.00

1 Nos
1 Nos

0.00
1996.80

#REF!

1 hour

#REF!
#REF!
#REF!
#REF!
337269598.xlsx data-Intake well -sinking

Page 2663 of 3205

Rs

#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2664 of 3205

ading, unloading charges, cost & conveyance, dumping, labour

82.70

82.70

1 Cum
Rs

82.70
#REF!
#REF!

Rs

82.70
#REF!
#REF!

1 Cum

trenches, sides of foundations and basement with initial lead in


amming including cost and conveyance of water to work site and
hed item of work. (APSS NO. 309 & 310)
Cum
450.00
384.00

1 Nos
1 Nos

0.00
119.04
16.21
135.25
22.54
#REF!
#REF!

sement with initial lead in layers not exceeding 15 cm thick,


yance of water to work site and all operational, incidental, labour
& 310)
Cum
641.93

1 Cum

450.00
384.00

1 Nos
1 Nos

3851.58
0.00
119.04
3970.62
540.6
4511.22
751.87
#REF!
#REF!

g hire charges, fuel charges and wages for Driver and Helper etc,
#REF!

1 Hp.hr

#REF!
Rs

Rs

#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2665 of 3205

ain Cement concrete nominal mix (1:4:8) prop (Cement : fine


including cost and conveyance of all materials like cement, sand,
harges , for mixing , laying, concrete , ramming in 15 cm layers,
.for foundation and under flooring bed.

Err:520
1489.81
791.93
#REF!

1 Kg

891.00

1 Cum
1 Cum
1 Kl

1340.83
356.37
2588.20

#REF!

1 hour

#REF!
#REF!

504.00
384.00

1 Nos
1 Nos

50.40
533.76

Rs
Rs
Rs

584.16
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

1 Cum

#REF!

584.16

1 Cum

29.21

Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
58.42
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2666 of 3205

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
87.62
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
116.83
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
146.04
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
175.25
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
204.46
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
233.66
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2667 of 3205

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
584.16

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
262.87
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
292.08
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
321.29
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
350.50
#REF!
#REF!
#REF!
#REF!
#REF!

ponding to IS 456 using WEIGH BATCHER / MIXER with 20mm


uarry including cost and conveyance of all materials like cement,
age charges, sales & other taxes on all materials including all
laying concrete, curing etc.,complete but excluding cost of steel
cement content as per IS code . for FOUNDATIONS, PLINTH,

5.50

1 Kg

2200.00

1854.81
791.93

1 Cum
1 Cum

1483.85
316.77
4000.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

67.03
120.15
1766.40
1953.58

#REF!

1 hour

#REF!

337269598.xlsx data-Intake well -sinking

Page 2668 of 3205

1 hour
#REF!

#VALUE!
#REF!
#REF!

1 Kl
Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2669 of 3205

#REF!
277.00
446.00

1 Cum
1 Cum
1 Cum

Rs

#REF!
277.00
446.00
89.20
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

1 Cum

#REF!

1953.58

1 Cum

97.68

Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
195.36
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
293.04
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
390.72
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2670 of 3205

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
488.40
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
586.07
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
683.75
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
781.43
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
879.11
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
976.79
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2671 of 3205

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1953.58

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1074.47
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1172.15
#REF!
#REF!
#REF!
#REF!
#REF!

sponding to IS 456 using WEIGH BATCHER / MIXER with 20mm


uarry including cost and conveyance of all materials like cement,
age charges, sales & other taxes on all materials including all
laying concrete, curing etc.,complete but excluding cost of steel
ment content as per IS code for COLUMNS, LINTELS, WATER

5.50

1 Kg

2200.00

1854.81
791.93

1 Cum
1 Cum

1483.85
316.77
4000.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

84.17
75.15
2150.40
2309.72

#REF!

#REF!

1 hour

#REF!

1 hour

#VALUE!
#REF!
#REF!
#REF!

1 Kl
Rs

#REF!
1115.00

1 Cum
1 Sqm

#REF!
2475.30

Rs

#REF!
#REF!
#REF!
#REF!

Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2672 of 3205

337269598.xlsx data-Intake well -sinking

Page 2673 of 3205

d Level
#REF!
1115.00

1 Cum
1 Sqm

#REF!
2475.30

2309.72

1 Cum

230.97

#REF!
#REF!
#REF!
#REF!
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!

#REF!
461.94
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
692.92
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
923.89
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1154.86
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2674 of 3205

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1385.83
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2675 of 3205

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1616.80
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1847.78
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
2078.75
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
2309.72
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
2540.69
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
2771.66
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2676 of 3205

337269598.xlsx data-Intake well -sinking

Page 2677 of 3205

els
#REF!
1115.00

1 Cum
1 Sqm

#REF!
2475.30

#REF!
#REF!
#REF!
#REF!
Rs

#REF!

#REF!

1 Cum

#REF!

2309.72

1 Cum

115.49

Rs
Rs
Rs
#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs

#REF!
2309.72

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
230.97
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
346.46
#REF!
#REF!
#REF!
#REF!

Rs

#REF!

Rs

#REF!
461.94
#REF!

1 Cum
1 Cum

337269598.xlsx data-Intake well -sinking

Page 2678 of 3205

Rs
Rs

#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2679 of 3205

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
577.43
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
692.92
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
808.40
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
923.89
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1039.37
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1154.86
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2680 of 3205

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
1115.00

1 Cum
1 Sqm

#REF!
1270.35
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1385.83
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
3188.90

#REF!
#REF!
#REF!
#REF!
Rs

#REF!
2309.72

1 Cum
1 Cum

#REF!

#REF!
230.97

#REF!
#REF!
#REF!
#REF!
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs

#REF!

#REF!
461.94
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
692.92
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2681 of 3205

Rs

#REF!
#REF!

Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2682 of 3205

#REF!

1 Cum

#REF!

2309.72

1 Cum

115.49

Rs
Rs
Rs
#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
230.97
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
346.46
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
461.94
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
577.43
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2683 of 3205

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs

#REF!
692.92
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
808.40
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
923.89
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1039.37
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1154.86
#REF!
#REF!
#REF!
#REF!

Rs

#REF!
2309.72

1 Cum
1 Cum
Rs
Rs
Rs

#REF!
2309.72

1 Cum
1 Cum

#REF!

#REF!
1270.35
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1385.83
337269598.xlsx data-Intake well -sinking

Page 2684 of 3205

Rs
Rs
Rs

#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2685 of 3205

ponding to IS 456 using WEIGH BATCHER / MIXER with 20mm


uarry including cost and conveyance of all materials like cement,
age charges, sales & other taxes on all materials including all
laying concrete, curing etc.,complete but excluding cost of steel
ment content as per IS code from standard suppliers approved by
uring etc. complete but excluding cost of steel and its fabrication

5.50
1854.81
791.93

504.00
450.00
384.00

1 Kg

2200.00

1 Cum
1 Cum

1483.85
316.77
4000.62

1 No
1 No
1 No

33.77
59.85
1181.57
1275.19

#REF!

1 hour
1 hour

#REF!

1 Kl

#REF!
227.00
152.00

#REF!
#VALUE!
#REF!
#REF!
Rs

#REF!

Rs

#REF!
1514.09
1013.84
202.77
#REF!
#REF!
#REF!
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

Rs

#REF!
227.00
152.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

#REF!
409.00
241.00

1 Cum
1 Sqm
1 Sqm

#REF!
1135.00
760.00
152.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
2728.03
1607.47
337269598.xlsx data-Intake well -sinking

Page 2686 of 3205

Rs

Rs

321.49
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2687 of 3205

#REF!
409.00
241.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

#REF!
3260.00

#REF!
3260.00

1 Cum
1 Sqm

#REF!
2045.00
1205.00
241.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
21744.20
Rs

#REF!
#REF!
#REF!
#REF!

Rs

#REF!

1 Cum
1 Sqmt.
Rs

Rs

#REF!
16300.00
#REF!
#REF!
#REF!
#REF!
#REF!

ponding to IS 456 using WEIGH BATCHER / MIXER with 20mm


uarry including cost and conveyance of all materials like cement,
age charges, sales & other taxes on all materials including all
laying concrete, curing etc.,complete but excluding cost of steel
cement content as per IS code . for FOUNDATIONS, PLINTH,

5.50

1 Kg

1925.00

1854.81
791.93

1 Cum
1 Cum

1483.85
316.77
3725.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

67.03
120.15
1766.40
1953.58

#REF!

1 hour

#REF!

1 hour

#VALUE!
337269598.xlsx data-Intake well -sinking

Page 2688 of 3205

#REF!

#REF!
#REF!

1 Kl
Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2689 of 3205

#REF!
277.00
446.00

#REF!
315.00
710.00

#REF!
1335.00
1075.00

1 Cum
1 Cum
1 Cum

#REF!
277.00
446.00
89.20
#REF!
#REF!
#REF!
#REF!
Rs

#REF!

Rs

#REF!
315.00
710.00
142.00
#REF!
#REF!
#REF!
#REF!
#REF!

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

#REF!
1335.00
1075.00
215.00
#REF!
#REF!
#REF!
#REF!
Rs

#REF!
#REF!

sponding to IS 456 using WEIGH BATCHER / MIXER with 20mm


uarry including cost and conveyance of all materials like cement,
age charges, sales & other taxes on all materials including all
laying concrete, curing etc.,complete but excluding cost of steel
ment content as per IS code for COLUMNS, LINTELS, WATER

5.50

1 Kg

1925.00

1854.81
791.93

1 Cum
1 Cum

1483.85
316.77
3725.62

504.00
450.00
384.00

1 Each
1 Each
1 Each

84.17
75.15
2150.40
2309.72

337269598.xlsx data-Intake well -sinking

Page 2690 of 3205

#REF!

#REF!

1 hour

#REF!

1 hour

#VALUE!
#REF!
#REF!

1 Kl
Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2691 of 3205

#REF!
341.00

1 Cum
1 Cum

#REF!
341.00

1603.00

1 Cum

1603.00

Rs

320.60
#REF!
#REF!
#REF!
#REF!

Rs

#REF!

#REF!
=

9%
9%
9%

30.69
144.27
#REF!
#REF!
Rs

#REF!

#REF!
=

37%
37%
37%

Rs

126.17
593.11
#REF!
#REF!
#REF!

#REF!
615.00

1 Cum
1 Cum

#REF!
615.00

2537.00

1 Cum

2537.00
507.40
#REF!
#REF!
Rs

m size

#REF!

2.78 Sqm

2.40

#REF!

1 Cum

#REF!

1099.00

1 Sqm

7332.53
Rs

#REF!
#REF!
#REF!
#REF!

Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2692 of 3205

m size

2.78 Sqm
#REF!

1 Cum

2.40m
#REF!

1099.00

1 Cum

7332.53
98.91
Rs

#REF!
#REF!
#REF!

Rs

#REF!
1133.00
1141.00

1 Cum
1 Cum
1 Cum
Rs

Rs

#REF!
#REF!

#REF!
1133.00
1141.00
228.20
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

ponding to IS 456 using WEIGH BATCHER / MIXER with 20mm


uarry including cost and conveyance of all materials like cement,
age charges, sales & other taxes on all materials including all
laying concrete, curing etc.,complete but excluding cost of steel
ment content as per IS code from standard suppliers approved by
uring etc. complete but excluding cost of steel and its fabrication

5.50
1854.81
791.93

504.00
450.00
384.00

1 Kg

1925.00

1 Cum
1 Cum

1483.85
316.77
3725.62

1 No
1 No
1 No

33.77
59.85
1181.57
1275.19

#REF!

#REF!

1 hour

#REF!

1 hour

#VALUE!
#REF!
#REF!

1 Kl
Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2693 of 3205

#REF!
227.00
152.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

#REF!
227.00
152.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

#REF!
1890.91
1266.16
253.23
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
1816.00
1216.00
243.20
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
=

9%
9%
9%

Rs

20.43
13.68
#REF!
#REF!
#REF!

#REF!
=

37%
37%
37%

#REF!
83.99
#REF!
#REF!
Rs

#REF!

#REF!
=

37%
37%
37%

0.00
0.00
#REF!
#REF!
Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2694 of 3205

#REF!
227.00
152.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

#REF!
1296.17
867.92
173.58
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
=

9%
9%
9%

#REF!
421.00
248.00

20.43
13.68
#REF!
#REF!
Rs

#REF!

Rs

#REF!
2808.07
1654.16
330.83
#REF!
#REF!
#REF!
#REF!
#REF!

1 Cum
1 Sqm
1 Sqm

Rs

#REF!
421.00
248.00

1 Cum
1 Sqmt.
1 Sqm
Rs

Rs

#REF!
3260.00

1 Cum
1 Sqm

#REF!
2105.00
1240.00
248.00
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
10855.80
Rs

#REF!
#REF!
#REF!
#REF!

Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2695 of 3205

#REF!
3260.00

1 Cum
1 Sqm

#REF!
10855.80

Rs

Rs

#REF!
3260.00

1 Cum
1 Sqm

#REF!
10855.80

Rs

Rs

#REF!
3260.00

1 Cum
1 Sqm

Rs

1 Cum
1 Sqm

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
27155.80

Rs

Rs

#REF!
3260.00

489.00
#REF!
#REF!
#REF!
#REF!

#REF!
27155.80
Rs

#REF!
3260.00

293.40
#REF!
#REF!
#REF!
#REF!
#REF!

1 Cum
1 Sqm

293.40
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
27155.80

Rs

Rs

489.00
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2696 of 3205

#REF!
3260.00

1 Cum
1 Sqm

#REF!
18614.60
Rs

Rs

#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2697 of 3205

#REF!
3681.00
2471.00

1 Cum
1 Cum
1 Sqm
Rs

Rs

#REF!
6632.00
3911.00

1 Cum
1 Cum
1 Sqm
Rs

Rs

#REF!
2002.00
1344.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

#REF!
3681.00
2471.00
494.20
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
6632.00
3911.00
782.20
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
2002.00
1344.00
268.80
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
=

9%
9%
9%

Rs
#REF!
3607.00
2127.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
#REF!

1 Cum

180.18
120.96
#REF!
#REF!
#REF!
#REF!
3607.00
2127.00
425.40
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2698 of 3205

73%
73%
73%

Rs

2633.11
1552.71
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2699 of 3205

#REF!
=

1 Cum
141%

#REF!

141%
141%

Rs
m size

7.25 Sqm

5085.87
2999.07
#REF!
#REF!
#REF!

#REF!

1 Cum

1.66m
#REF!

1099.00

1 Cum

13226.47
Rs

#REF!
#REF!
#REF!

Rs
m size

7.25 Sqm

#REF!
#REF!

#REF!

1 Cum

1.66m
#REF!

1099.00

1 Cum

13226.47
98.91
Rs

#REF!
#REF!
#REF!

Rs

#REF!
224.00
175.00

1 Cum
1 Sqm
1 Sqm
Rs
Rs

Rs

#REF!
#REF!

#REF!
224.00
175.00
35.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

wire mesh & nominal reinforcement as directed by Engineer-insite, seigniorage charges, sales & other taxes on all materials,
, centering, scaffolding and form work, lift charges etc., complete
ed item of work. (APSS No.403 & 903)

#REF!

1 sqm

#REF!

3733.88
5.50

1 cum
1 kg

933.47
275.00
337269598.xlsx data-Intake well -sinking

Page 2700 of 3205

2981.84

10 sqm

6500.41

504.00
504.00

1 day
1 day
1 day

4032.00
504.00
3840.00

1 Hrs

#REF!

384.00
#REF!

Rs

Rs
Rs

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2701 of 3205

ulphate Resistant Cementm finished smooth including cost and


curing, scaffolding and all operational, incidental, labour charges
work. (As per SS 903). per 10 Sqm.

3733.88

1 Cum

560.08

504.00
384.00

1 Nos
1 Nos

302.40
368.64

Rs
3F

4F

5F

#REF!

#REF!

#REF!

9.90

9.90

9.90

107.40

131.80

156.10

21.48

26.36

31.22

58.70

88.05

117.40

#REF!

#REF!

#REF!

1231.12
167.62
1398.74
#REF!
#REF!

n C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara
ater, etc., to site, seigniorage charges, all operational, including
ncluding cutting grooves where ever necessary etc., complete for

5.50
858.93
5.50

1 Kg

236.50

1 Cum

154.61

1 Kg

79.75

858.93

1 Cum

34.36

504.00
450.00
384.00

1 day
1 day
1 day

Rs
3F

4F

5F

#REF!

#REF!

#REF!

9.90

9.90

9.90

107.40

131.80

156.10

21.48

26.36

31.22

317.52
661.50
1497.60
2981.84
405.98
3387.82
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2702 of 3205

58.70

88.05

117.40

#REF!

#REF!

#REF!

337269598.xlsx data-Intake well -sinking

Page 2703 of 3205

smooth including cost and conveyance of all materials to site,


incidental, labour charges etc., including cutting grooves where

3733.88

1 Cum

504.00
384.00

1 Nos
1 Nos

784.11

Rs
3F

4F

5F

#REF!
9.90
58.70
11.74
58.70

#REF!
9.90
58.70
11.74
88.05

#REF!
9.90
58.70
11.74
117.40

#REF!

#REF!

#REF!

473.76
61.44
1319.31
179.62
1498.93
#REF!
#REF!

with CM(1:3), 20mm thick with 1kg of water proof compound per
orage charges, excluding conveyance charges of materials and
ering smooth and thread lining, curing, rounding off junctions of

3733.88
#REF!

1 Nos
1 Kg

784.11

504.00
450.00
384.00

1 Nos
1 Nos
1 Nos

332.64
693.00
1420.80
3230.55
439.84
3670.39
#REF!
#REF!

Rs

Rs

hanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe
r charges for straightening, cutting, bending to required sizes and
g and lap-splicing with binding wire of 18 SWG, forming grills for
eyance of steel bars, including all wastages such as overlaps,
blocks and all incidental, operational, labour charges such as
rials etc., complete for finished item of work in all floors.( APSS

#REF!

1 Ton
1 kg

588.00
384.00

1 No
1 No

#REF!

5880.00
3840.00
337269598.xlsx data-Intake well -sinking

Page 2704 of 3205

#REF!
#REF!
#REF!
#REF!

1 MT
Sub Total:
Rs.

#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2705 of 3205

f slab incuding labour charges for fixing and all incidental and
#REF!

1 Kg

#REF!

Rs
Rs

#REF!
#REF!

angles 2 nos verticals and horizontals fixed at 25 cm c/c as per


with anti corrosive paint two coats over one coat of primary coat
uties, fixing in position duly embodying in CC (1:1.5:3) prop., and

#REF!

1 kg

#REF!

1 Kg
#REF!

10 Sqm

#REF!

Rs.
Rs.

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

horoughly brushing the surface to remove all dirt and remains of


l such as scaffolding, lift charges etc., complete for finished item
#REF!

1 Kg

#REF!
10.00

504.00
384.00

1 Nos
1 Nos

105.84
122.88
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rs

Rs

#REF!

ost and conveyance of all materials to site, sales & other taxes,
APSS No. 1201, 1207 & 1212).
#REF!

1 Ltr

#REF!

504.00

1 Each

352.80
10.00
#REF!
#REF!
337269598.xlsx data-Intake well -sinking

Page 2706 of 3205

#REF!
#REF!
Rs

#REF!

337269598.xlsx data-Intake well -sinking

Page 2707 of 3205

ve strength not less than 20 N / sq mm ) grade cement concrete


all materials, machinery, labour, formwork, centering, scaffolding,
,complete for RCC ornamental parapet consisting of 35 cm x
x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5
and coping chamferred or rounded as directed etc., complete
upto 1 km and all lifts. ( Cement content : 300 kg / cum with use
, FA : 0.44 cum)

Rmt
5.50
5.50
1854.81
1519.81
858.93
#REF!
0.00

1 kg
1 kg
1 cum
1 cum
1 cum
1 kg
1 sqm

13475.00
192.50
6751.51
2978.83
2645.50
#REF!
0.00
0.00
30.00
#REF!

#REF!

1 Hour
1 Hour
1 Hour

#REF!

#REF!
504.00
480.00

1 Day
1 Day

1008.00
480.00

384.00
384.00
384.00
384.00
384.00
384.00
0.00

1 Day
1 Day
1 Day
1 Day
1 Day
1 Day
1 sqm

768.00
3456.00
1536.00
768.00
2688.00
768.00
0.00
0.00
11472.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2708 of 3205

nd technical specifications Clause 1208.2 MORD / 1900 & 2703

#REF!

1t
1t
1t
1 kg

504.00
384.00
#REF!

1 day
1 day

#REF!

15120.00
16435.20
#REF!

#REF!

Rs

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

ay be worked out as per design to be

ance of all material , labour charges for fabrication and fixing in


#REF!

1 Kg

#REF!

379.70
#REF!

1000 Kg
1 Kg
1 Kg

0.38

#REF!
#REF!
#REF!
#REF!
Rs

#REF!

23x11x7 Cm in Cement Mortor 1:6 Prop including Cost &


niorage charges on all materials, including all labour charges like
or finished item of work

5.50
4700.00
791.93
504.00
450.00
384.00

1 Kg
1000 Nos
1 Cum
1 day.
1 day.
1 day.

264.00
2406.40
158.39
120.96
252.00
725.76
337269598.xlsx data-Intake well -sinking

Page 2709 of 3205

Rs

Rs

3927.51
534.73
4462.24
#REF!
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2710 of 3205

3F

4F

5F

#REF!

#REF!

#REF!

43.17

43.17

43.17

466.91

572.87

678.78

93.38

114.57

135.76

255.04

382.57

510.09

#REF!

#REF!

#REF!

ight including fixing in required position, driving in to the ground


#REF!

1 No

#REF!
#REF!
#REF!
#REF!

luding fixing in required position, driving in to the ground up to a


#REF!

1 No

#REF!
#REF!
#REF!
#REF!

#REF!

1 Each

#REF!

#REF!
#REF!
#REF!
#REF!

ed deformed steel Anchor rods with 0.75m length driven in to the


ng cost of all materials, machinary, labour, drilling and cleaning
o 50m and all lifts.

#REF!

1 Kg

#REF!

1 Nos
1 Nos

588.00
450.00
384.00

1 day
1 day
1 day
Rs
Rs

294.00
225.00
384.00
#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2711 of 3205

Rs

#REF!
#REF!

337269598.xlsx data-Intake well -sinking

Page 2712 of 3205

ow with 6 m lift complete with load chain and hand chain suitable
21841.00

1 No

21841.00

291.00

1 job

291.00

Rs

22132.00
3013
25145.00
0.00
25145.00
25145.00

337269598.xlsx data-Intake well -sinking

PRICE SCHED
AGREEMENT NO:TO/08/2011-1
Name of the work:- Drilling of 163mm (6 1/2") d
Name of the Bore well Firm: M/s. Shiva
Sl.No

Description of item

2
Drilling of Bore wells by down the hole hammer, (DTH) drilling to finished dia of 163mm
(6 1/2" dia) in all formations to the depth specified and reaming the bore to the
required dia flushing the bore walls at an average pressure of 7kg/Cm2 (100 PSI)
conducting yield test, inclusive of transportation form point to point, crew charges,
consumables, shifting of Rig and all other charges etc., in all over the District. The
borewells should be true & vertical and work should be caried out to the satisfaction of
the department and carried out as per IS-2800 Part-1 7 II/ 1979 and amendments if
andy from time to time . The rate is inculding all taxes etc., complete as applicable.

Cost of 180mm dia/6kgf. UPVC casing pipes for bore wells for potable water supply
confiming to ISI.12818/1992 as amended from to time including transporation etc., QC
inspection should be carried out by the concerned Deputy Executive engineer and
Section Officer, QC Certificate should be produced for making payment inculding
insertion of casing.
Drilling of Bore wells by down the hole hammer, (DTH) drilling using combination of 8"
to 11" dia Drill Bits in all formations to the using depth60 m in collasable Soils and
reaming the bore to the required dia flushing the bore walls at an average pressure of
7kg/Cm2 (100 PSI) conducting yield test, inclusive of transportation form point to point,
crew charges, consumables, shifting of Rig and all other charges etc., in all over the
District. The borewells should be true & vertical and work should be caried out to the
satisfaction of the department and carried out as per IS-2800 Part-1 7 II/ 1979 and
amendments if andy from time to time . The rate is inculding all taxes etc., complete as
applicable.

Slotted casing Pipe for Combination Rig PVC casing pipes for bore wells for potable
water supply confirming to ISI 12818/1992 as amended from time to time including
transportaion etc., QC inspection should be carried out by the concerned Deputy
Executive Engineer and section Officer, QC Ceritificate should be produced for making
payment including inseration of casing

Deepening of Bore well to a finish dia 163mm ( 6 1/2' dia) in all formations to the depth
specified and flusing the bore well at an avergage pressure of 7 kg/cm2 (100 PSI),
conducting yield test, shifting of rig and all other charges etc., in all over the District,
for all depth and also inclusive of removal and Re-errection of Hand Pump set. Bore
well should be true and vertical and should be carried out to the satisfaction of the
department. The rate is including all taxes etc. complete as applicable.

Cleaning of Bore Wells by Flushing the Bore Wells size 6 1/2' & 4 1/2' dia at
anverage pressure of 7kg/cm2 (100 PSl) conducting yield test, inclusive of
transporation from point to point, crew charges, consumables, shifting of Rig and all
other charges etc., in all over the District carried out as per IS-2800 Part-1 & ll/ 1979
and amendments if any from time to time. The rate is including all taxes etc. complete
as applicable.

PRICE SCHEDULE
EMENT NO:TO/08/2011-12, DATED : 03.08.2010
illing of 163mm (6 1/2") dia Bore wells in Ranga Reddy District
ore well Firm: M/s. Shiva Drillers, Saidabad, Hyderabad
Unit
3

Rate in Figure
5

Rates Approved
Rate in words ( in Rs.)
6

Up to depth of 90 Mtrs. @
1.00 Rmt.(One
Rs.305.00 and above 90 Mtrs.
Running meter
Depth 10% extra per Rmt on
only)
drilling rate.

1.00 Rmt.(One
Running meter
only)

1.00 Rmt.(One
Running meter
only)

1.00 Rmt.(One
Running meter
only)

Three hundred and five only

As per Current SSR with condition of Price variation

Rs.535.00

Five hundred and thirty five only

As per Current SSR with condition of Price and 10% extra for slotting

1.00 Rmt.(One
Running meter
only)

Rs. 315.00

Three hundred and fifteen only

Each Bore well

Rs. 7800.00

Seven thousand and eight hundred only

Page 2717 of 3205

HUZUR NAGAR MUNICIPALITY

Comprehensive Water supply scheme for Huzur Nagar Municipality


Laying of Distribution Lines in Zone - I Area
DETAILED & ABSTRACT ESTIMATION

Description of Item

S. N.

No

Total EWE Quantity


100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe
200 mm dia DI K7 pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
Total EWE Qty
Cutting open BT road surface (as well as asphalt concrete upto 75 mm thick ) including
water bound macadam and stacking of excavated materials for pipe line trench work. as
directed by the departmental officers.
100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe
200 mm dia DI K7 pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe

1
1
1
1
1
1
1

x
x
x
x
x
x
x

1
1
1
1
1
1
1

44215.00
#REF!
22366.00
1191.00
0.00
517.00
176.00
0.00
68465.00 Rmt

1
1
1
1
1
1
1

x
x
x
x
x
x
x

1
1
1
1
1
1
1

6632.00
#REF!
3355.00
179.00
0.00
78.00
26.00
0.00
10270.00 Rmt

1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

Quantity

#REF!

#REF!
22366.00
1191.00
0.00
517.00
176.00
0.00
#REF!

#REF!
3355.00
179.00
0.00
78.00
26.00
0.00
#REF!

Cutting open C.C. road surface including stacking of excavated materials for pipe line
trench work. as directed by the departmental officers.
100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe
200 mm dia DI K7 pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe

Dist-AC-DI-100 to 400 - 337269598.xlsx

995.00
2237.00
119.00
0.00
52.00
18.00

#REF!

0.15
0.15
0.15
0.15
0.15
0.15

#REF!
335.55
17.85
0.00
7.80
2.70

2717

Page 2718 of 3205

Description of Item

S. N.
400 mm dia DI K7 Pipe

No
1

Dist-AC-DI-100 to 400 - 337269598.xlsx

L
1

0.00
3421.00 Rmt

Quantity
0.15

0.00
#REF!

2718

Page 2719 of 3205

S. N.

Description of Item

Cutting open water bound macadam road including soiling for pipe line trench work. as
directed by the departmental officers.
100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe
200 mm dia DI K7 pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe

No

3316.00
#REF!
1677.00
89.00
0.00
39.00
13.00
0.00
5134.00 Rmt

Quantity

1
1
1
1
1
1
1

X
X
x
x
x
x
x

1
1
1
1
1
1
1

0.15
0.15
0.15
0.15
0.15
0.15
0.15

#REF!
251.55
13.35
0.00
5.85
1.95
0.00
#REF!

#REF!

70%

#REF!

#REF!

5%

#REF!

RBR-FNDN-1- (i-B) - In ordinary soils, by Mechanical means


Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and
technical specifications including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material , dressing of sides and bottom as per Technical
Specification 304 MORTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and
taking all precautionary measures in the restricted areas for laying sewer/water lines
including divertion of traffic and backfilling in trenches with excavated suitable material
and disposal of remaining earth upto a lead of 50 m, including all incidental and
operational charges etc., complete for Pipe Lines by mechanical means.

% of the EWE Quantity


BLD-CSTN-2-5 - (13) : Earth work excavation for foundations and depositing on bank for
all lifts and with an initial lead of 10m including all operational, incidental, labour charges
such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work
including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m depth

% of the EWE Quantity

Dist-AC-DI-100 to 400 - 337269598.xlsx

2719

Page 2720 of 3205

S. N.

Description of Item

RBR-FNDN-1- (i-A) In ordinary soils, by Manual means


Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and
technical specifications including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material , dressing of sides and bottom as per Technical
Specification 304 MORTH and as directed by the departmental officer including
protecting the existing utility services wherever it is possible during the execution and
taking all precautionary measures in the restricted areas for laying sewer/water lines
including divertion of traffic and backfilling in trenches with excavated suitable material
and disposal of remaining earth upto a lead of 50 m, including all incidental and
operational charges etc., complete for Pipe Lines by manual means.

No

Quantity

% of the EWE Quantity


RBR-FNDN-1- (iv) - In hard rock blasting prohibited:
Excavation in Hard rock (blasting prohibited) Upto 3 m depth including 1.5 m depth in
hard rock : Earthwork excavation in hard rock such as sheet rock and boulders in habitant
areas where conventional blasting can not be done for pipe line trenches, including all
incidental and operational charges etc., complete.

#REF!

20%

#REF!

% of the EWE Quantity


RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as
per drawing and technical specifications including setting out, construction of shoring and
bracing, removal of stumps and other deleterious material and disposal upto a lead of 50
m, dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust
blocks, Chambers and Man Holes etc. by manual means.

#REF!

5%

#REF!

3.00

2.50

Thrust Blocks for bends and specials


for specials of above 300mm dia
PHE-SHST-25: Providing shoring and shrutting for excavation of trenches for laying pipe
lines including cost and conveyance of all materials, labour charges and removal of
shoring and shuttering at appropriate places as directed by the departmental officers with
all incidental and ooperational charges etc, complete.

Single staging for 0 to 2.50 Mts.@ 10% length


Dist-AC-DI-100 to 400 - 337269598.xlsx

1.50

45.00

2720

Page 2721 of 3205

Description of Item

S. N.
for pipe line trenches

No
1

Dist-AC-DI-100 to 400 - 337269598.xlsx

L
2

6847.00

Quantity
1.50

20541.00

2721

Page 2722 of 3205

S. N.

Description of Item

10

PHE-BHLW-26 ; Barricading, hoarding, lighting and watching etc., for water supply and
sewerage works for trenches of depths upto 6-0 (2 Meter) below G.L

11

12

No

For 10% length on both sides


RBR-FNDN-2 : Collection ,Supply and filling of Stone dust from approved quarry to work
site and stacking at work site to Dept. gauge for premeasurements including cost and
convenyance of all material and all labour charges etc. complete as per standard
specifications. Clause 305.3.9 MORD & 304 MORTH
for Bedding of Pipe line
100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe
200 mm dia DI K7 pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
for restoration of BT & CC Roads
100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe
200 mm dia DI K7 pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe

Quantity

0.10

68465.00

1
1
1
1
1
1
1

1
1
1
1
1
1
1

44215.00
22366.00
1191.00
0.00
517.00
176.00
0.00

#REF!

0.15
0.15
0.15
0.15
0.15
0.15
0.15

#REF!
3354.90
178.65
0.00
77.55
26.40
0.00

1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1

7627.00
5592.00
298.00
0.00
130.00
44.00
0.00

#REF!

0.80
0.80
0.85
0.90
0.95
1.00
1.05

#REF!
4473.60
253.30
0.00
123.50
44.00
0.00
#REF!

1
1

x
x

1
1

44658.00
22254.50

13693.00

Manufacture as per BIS NO: 1592/2003AS amended from time to time (MAZZA
PROCESS) and supply of AC pressure pipes duly marked with BIS mark, including cost
of material, incidental, handling, loading and packing charges , transportation, unloading,
stacking at Dept.. stores, Excise duty, VAT, OCTROI and other Govt.Levies.

100 mm dia AC class -15 Pipe


150 mm dia AC class -15 Pipe

Dist-AC-DI-100 to 400 - 337269598.xlsx

44658.00
22254.50

2722

Page 2723 of 3205

S. N.

Description of Item

13

Manufacture, supply and delivery of AC couplings without rubber rings to suit 350mm dia
AC pressure pipes (Class20) including cost of material, incidental, handling, loading and
packing charges, transportation, unloading, stacking at site,but excluding excise duty,
octroi and other Government levies .

No

Quantity

1
1

x
x

10049
5008

10049
5008

14

100 mm dia AC class -15 Pipe


150 mm dia AC class -15 Pipe
Supply of Rubber rings manufactured as per BIS No.5382/88 and with BIS mark
embosses per each set suitable for AC couplings to suit 350mm dia AC pressure pipes
(class 20) including cost of material, incidental charges, handling, packing, transportation
and unlooading at site transit risk but excluding taxes etc.

1
1

x
x

10049
5008

10049
5008

15

100 mm dia AC class -15 Pipe


150 mm dia AC class -15 Pipe
Manufacture, supply, delivery of CI pipes and fittings (Spls) confirming to IS
No.7181/1986, 5531/1988, 3950/1979 and CID joints confirming to IS 8794/1988 at site
of work anywhere in AP including loading, transportation to site of work stacking at site
transit risk and package excluding taxes and duties.

1
1
1
1

x
x
x
x

1117
556
1796
1050

1
1
1
1
1
1
2
2

x
x
x
x
x
x
x
x

147
177
221
126
29
35
177
177

CID joints
CID joints -100mm dia -10% of the Total length
CID joints -150mm dia -10% of the Total length
for Bends and specials of 100mm dia AC pipe
for Bends and specials of 150mm dia AC pipe
Specials for AC pipe Line - 100mm dia Class-15
Plain ended 90 degree Bends
Plain ended 45 degree Bends
Plain ended 22.5 degree Bends
Plain ended Tees - 100 x 100 x 100
Plain ended Cross
End caps 100mm dia
D/F pipe 0.9 mts
Tail piece 0.60 mts

Dist-AC-DI-100 to 400 - 337269598.xlsx

3.80 Kg
6.30 Kg
3.80 Kg
6.30 Kg
10.30
10.00
7.40
13.50
16.80
4.90
31.26
19.45

4242.70
3505.32
6824.80
6615.00
1514.10
1770.00
1635.40
1701.00
487.20
171.50
11066.04
6885.30

2723

Page 2724 of 3205

Description of Item

S. N.
c

No

Specials for AC pipe Line - 150mm dia Class-15


Plain ended 90 degree Bends
Plain ended 45 degree Bends
Plain ended 22.5 degree Bends
Plain ended Tees - 150 x 150 x 150
Plain ended Tees - 150 x 150 x 100 ( for inter connections )
Plain ended Cross
End caps 150mm dia
D/F pipe 0.9 mts
Tail piece 0.60 mts
for Scouring arrangments - 100mm dia
duck foot bends
Semi circular bends
CI D/F pipes -0.60m
for Scouring arrangments - 150mm dia
duck foot bends
Semi circular bends
CI D/F pipes -0.60m
add for short Pipes ,Specials & inter connections etc as per site condition.

Quantity

1
1
1
1
1
1
1
2
2

x
x
x
x
x
x
x
x
x

75
89
112
64
22
15
18
124
124

21.00
19.60
14.40
26.00
23.10
32.00
14.30
50.84
32.00

1575.00
1744.40
1612.80
1664.00
508.20
480.00
257.40
12608.32
7936.00

1
1
2

x
x
x

45
45
45

47.00
62.00
38.36

2115.00
2790.00
3452.40

1
1
2

x
x
x

1
1
1

47.00
62.00
38.36

47.00
62.00
76.72
6847.00
90194.60

16

17

Supply and delivery of Bolts and nuts with double washers including taxes and
conveyance etc,. For CID joints.
Bolts & Nuts for CID Joints -100mm dia
Bolts & Nuts for CID Joints -150mm dia

4
4

x
x

2913
1606

1
1

x
x

1
1

0.19 Kg
0.34 Kg

2155.25
2159.00
4314.25

Lowering, laying and Jointing of AC Pressure pipes with AC Couplings or CID Joints
complete with Rubber Rings in readymade trenches true to alignment and gradient
including filling with water lead up to 500 mts and testing to required pressure including all
sundries but excluding cost of jointing materials and conveyance from source of supply as
per BIS No. 6530/72
100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe

Dist-AC-DI-100 to 400 - 337269598.xlsx

44215.00
22366.00

44215.00
22366.00

2724

Page 2725 of 3205

S. N.

Description of Item

18

Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with
socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 &
6 meterfor classification K7 suitable for push on joint ( Rubber Gasket D jointing) with
cement mortar lining inside the pipes with out side Zinc coating. Rates are including
Transportationand CED and ST etc,. complete.

19

No

100mm dia DI K7 pipe


150mm dia DI K7 pipe
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
Manufacture as per bis 12820/89 with S.B.R. quality rubber confirming to BIS: 5382/85,
supply and delivery of rubber gaskets suitable for C.I/ D.I. S/S pipes anywhere in A.P.
including cost of material, loading, incidental handling with companys standard packing,
transportation, unloading & stacking, central excise duty but excluding VAT etc.,
complete.for 5.50 m working length pipes

1
1
1
1
1
1
1

x
x
x
x
x
x
x

1
1
1
1
1
1
1

100mm dia DI K7 pipe


150mm dia DI K7 pipe
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe

1
1
1
1
1
1
1

x
x
x
x
x
x
x

121
61
219
0
95
33
0

Dist-AC-DI-100 to 400 - 337269598.xlsx

665.50
335.50
1204.50
0.00
522.50
181.50
0.00

Quantity

665.50
335.50
1204.50
0.00
522.50
181.50
0.00

121
61
219
0
95
33
0

2725

Page 2726 of 3205

S. N.

Description of Item

20

PHE-LCIS-1: Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends
carefully into trenches and laying them true to alignment and gradient including all
sundries but excluding cost and conveyance of pipes from source of supply (Ref to
specifications. BIS No.3114/1994)

21

22

I
a

No

100mm dia DI K7 pipe


150mm dia DI K7 pipe
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, excluding
the cost of the gasket but including all sundries filling with water with a water lead upto
500 m and testing to required pressure etc., complete as per BIS No.3114/85.

1
1
1
1
1
1
1

x
x
x
x
x
x
x

1
1
1
1
1
1
1

100mm dia DI K7 pipe


150mm dia DI K7 pipe
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
Manufacture, supply and delivery of centrifugally cast (spun ) ductile iron fittings
conforming to IS No. 9523/2000 having dimentions as per table. , zinc coated externally
with inside mortor lining (with finishing as per class 13/IS 9523/2000 as per Code No 1 )
including transportation, taxes and duties etc.

1
1
1
1
1
1
1

x
x
x
x
x
x
x

121
61
217
0
94
32
0

1
1
1
1
1
1
1

X
X
X
X
X
X
X

221
112
6
0
9
3
3

Double socket
branch
flangedia
Tee
Up to 500mm
100 x 100
150 x 150
200 x 200
250 x 250
300 x 200
300 x 250
300 x 300

Dist-AC-DI-100 to 400 - 337269598.xlsx

665.50
335.50
1191.00
0.00
517.00
176.00
0.00

Quantity

665.50
335.50
1191.00
0.00
517.00
176.00
0.00

121
61
217
0
94
32
0

17.00
28.00
44.00
63.00
66.00
76.00
88.00

3757.00
3136.00
264.00
0.00
594.00
228.00
264.00

2726

Page 2727 of 3205

Description of Item

S. N.
350 x 250
350 x 350
400 x 300
400 x 400

No
1
1
1
1

X
X
X
X

Dist-AC-DI-100 to 400 - 337269598.xlsx

L
1
1
3
0

B
89.00
117.00
116.00
150.00

Quantity
89.00
117.00
348.00
0.00
8797.00

2727

Page 2728 of 3205

Description of Item

S. N.
II
a

III
a

IV
a

V
a

No

Quantity

Double socket concentric tapers


Up to 500 x 450mm dia
150 x 100
200 x 150
250 x 200
300 x 250
350 x 300
400 x 300
400 x 350

1
1
1
1
1
1
1

X
X
X
X
X
X
X

166
59
3
1
2
1
0

13.00
20.00
27.00
35.00
45.00
60.00
55.00

2158.00
1180.00
81.00
35.00
90.00
60.00
0.00
3604.00

Flanged Sockets
Up to 500mm dia
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
400 mm dia

1
1
1
1
1
1
1

X
X
X
X
X
X
X

177
124
5
7
6
0
124

9.00
14.00
20.00
26.00
35.00
45.00
55.00

1593.00
1736.00
100.00
182.00
210.00
0.00
6820.00
10641.00

Flanged Spigots
Up to 500mm dia
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia
350 mm dia
400 mm dia

1
1
1
1
1
1
1

X
X
X
X
X
X
X

570
295
23
11
20
1
0

11.00
17.00
26.00
36.00
48.00
57.00
70.00

6270.00
5015.00
598.00
396.00
960.00
57.00
0.00
13296.00

Double socket bends


Up to 500mm dia
100 mm dia
150 mm dia
200 mm dia
250 mm dia
300 mm dia

1
1
1
1
1

X
X
X
X
X

4
2
8
0
3

10.00
17.00
27.00
37.00
52.00

40.00
34.00
216.00
0.00
156.00

Dist-AC-DI-100 to 400 - 337269598.xlsx

2728

Page 2729 of 3205

Description of Item

S. N.
350 mm dia
400 mm dia

No
1
1

X
X

Dist-AC-DI-100 to 400 - 337269598.xlsx

L
1
0

B
68.00
86.00

Quantity
68.00
0.00
514.00

2729

Page 2730 of 3205

S. N.

Description of Item

23

Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated
soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade
GGG40/ SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent
revisions, wedge fully rubber lined with EPDM food grade quality
and seals of NBR
and the valves should be of vacuum tight and 100% leak proof with face to face
dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be
with Electrostatic powder coating both inside and outside pocket less body passage.
Drilled as per IS:1538.

24

25

No

DI D/F Sluice valves of PN.10 class


100mm dia Sluice Valves Including Scour)
150mm dia Sluice Valves Including Scour)
200mm dia Sluice Valves
250mm dia Sluice Valves
300mm dia Sluice Valves
350mm dia Sluice Valves
400mm dia Sluice Valves
PHE-CISV-15 ; Lowering, keeping in position and fixing C.I. sluice valves (with cap / with
hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve
and tail pieces

Quantity

1
1
1
1
1
1
1

X
X
X
X
X
X
X

177
124
5
7
6
1
0

177
124
5
7
6
1
0

100mm dia Sluice Valves Including Scour)


150mm dia Sluice Valves Including Scour)
200mm dia Sluice Valves
250mm dia Sluice Valves
300mm dia Sluice Valves
350mm dia Sluice Valves
400mm dia Sluice Valves
PHE-JCIF-5 : Jointing CI pipes, fittings and valves with flanged ends including cost of
jointing materials such as bolts, rubber insertion, white lead including filling with water,
with lead up to 500 meters and testing to required pressure complete. (Reference to
specifications. BIS No.3114/1994.)

1
1
1
1
1
1
1

X
X
X
X
X
X
X

177
124
5
7
6
1
0

177
124
5
7
6
1
0

100mm dia Sluice Valves Including Scour)


150mm dia Sluice Valves Including Scour)
200mm dia Sluice Valves
250mm dia Sluice Valves

2
2
2
2

X
X
X
X

177
124
5
7

354
248
10
14

Dist-AC-DI-100 to 400 - 337269598.xlsx

2730

Page 2731 of 3205

Description of Item

S. N.
300mm dia Sluice Valves
350mm dia Sluice Valves
400mm dia Sluice Valves

No
2
2
2

X
X
X

Dist-AC-DI-100 to 400 - 337269598.xlsx

L
6
1
0

Quantity
12
2
0

2731

Page 2732 of 3205

S. N.

Description of Item

26

Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in
Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and
subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless
steel, and Gaskets and seals of EPDM food grade quality.S Epoxy powder coating (EPP) inside and outside colour blue. Drilled as per IS:1538.

27

28

29

30

No

Quantity

50mm dia Air Valve


80mm dia Air Valve
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/
Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber
insertions etc., complete.

1
1

X
X

68
1

68
1

50mm dia Air Valve


80mm dia Air Valve
Dismantelling & clearing away the stone masonary in CM & carting the excavated
materialfrom the site within 2 kms distance to a suitable site including loading, unloading,
conveyance charges & dumping the carted materialat the contractor's cost, including all
labour charges, all leads, lifts and other incidental & operational charges etc.,complete for
CRS masonary of SWD.

1
1

X
X

68
1

68
1

Existing Drains
Dismantelling & clearing away the CC & carting the excavated material from the site
within 5.00 kms distance to a suitable site including loading, unloading, conveyance
charges & dumping the carted materialat at the contractor's cost, including all labour
charges, all leads, lifts and other incidental & operational charges etc.,complete.

137

3.00

1.00

1.00

411.00

98

5.00

1.00

0.20

98.00

86

5.00

1.00

0.20

86.00

Dismantelling & clearing stacking useful materials of the Reinforced concrete


(excavated material) & transporting away the site within 10kms distance to a suitable site
including loading, unloading, conveyance charges & dumping the carted materialat the
contractor's cost, including all labour charges, all leads, lifts and other incidental &
operational charges etc.,complete for SWD roof slabs.

Dist-AC-DI-100 to 400 - 337269598.xlsx

2732

Page 2733 of 3205

S. N.

Description of Item

31

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement
concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all
materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on
all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers,
finishing top surface to the required level curing etc., complete for finished item of
work.for foundation and under flooring bed.

for bedding under thrust blocks for bends


for specials of above 300mm dia
for road restoration
100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe
200 mm dia DI K7 pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe

No

32

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate )
using 20mm size Hard Granite Machine Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete
for finished item of work with nomonal reinforcement

for Anchor blocks


for Thrust blocks for bends

Quantity

3.00

2.50

0.15

4.50

1
1
1
1
1
1
1

X
X
X
X
X
X
X

1
1
1
1
1
1
1

7627.00
5592.00
298.00
0.00
130.00
44.00
0.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

0.10
0.10
0.10
0.10
0.10
0.10
0.10

1525.40
1118.40
59.60
0.00
26.00
8.80
0.00
2742.70

1
1

X
x

114
4

1.00
2.80

0.75
2.30

1.00
1.35

85.50
34.78
120.28

Dist-AC-DI-100 to 400 - 337269598.xlsx

2733

Page 2734 of 3205

S. N.

Description of Item

33

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level


Plain Cement concrete nominal mix M-30 (Cement : fine aggregate: coarse aggregate )
using 20mm size Hard Granite Machine Crushed Graded Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete
for finished item of work with nomonal reinforcement for Road restoration.

for Road restoration


100 mm dia AC class -15 Pipe
150 mm dia AC class -15 Pipe
200 mm dia DI K7 pipe
250 mm dia DI K7 Pipe
300 mm dia DI K7 Pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
Add for Repairs of structures desmanteled during the excavation

34

35

No

2.00
2.00
2.00
2.00
2.00
2.00
2.00

Quantity

1
1
1
1
1
1
1

X
X
X
X
X
X
X

1
1
1
1
1
1
1

7627.00
5592.00
298.00
0.00
130.00
44.00
0.00

0.15
0.15
0.15
0.15
0.15
0.15
0.15

2288.10
1677.60
89.40
0.00
39.00
13.20
0.00
36.38
4143.68

100mm dia
150mm dia
200mm dia
Uprooting of R.C.C./ AC Pipes including breaking the collars, loosing the joint, scraping
the pipe, hoisting and keeping within a lead of 10 M but excluding earthwork excavation
and refilling

1
1
1

X
X
X

1
1
1

2054.00
1712.00
1369.00

2054.00
1712.00
1369.00

100mm dia
150mm dia
200mm dia

1
1
1

X
X
X

1
1
1

5135.00
3081.00
2739.00

5135.00
3081.00
2739.00

PHE-URCI-19 ; Uprooting the existing following sizes of CI/DI water supply mains by
melting the lead loosening the joints, scraping the pipes, hoisting and transporting to a
suitable distance as directed by the departmental officers but excluding earth work
excavation and refilling including all incidental and operational charges etc., complete.

Dist-AC-DI-100 to 400 - 337269598.xlsx

2734

Page 2735 of 3205

S. N.

Description of Item

36

Uprooting of old S.W. pipes including breaking of joints and bed concrete stacking of
useful materials near the site with in 50m lead and disposal of un serviceable materials in
to municipal dumps excluding the cost of earth work excavation. (Reference to
specifications BIS No.)

37

38

a)
39

40

No

Quantity

100mm dia
150mm dia
200mm dia
Providing temporary water supply house service connections with ISI mark GI pipes and
fittings so as not to disturb the existing water supply connections during earth work
excavation for trenches and during laying of new mains in including cost and conveyance
of all materials, labour charges and with all incidental and operational charges etc.,
complete.

1
1
1

X
X
X

1
1
1

15mm dia
Providing temporary UPvc Sewer house service connections, so as not to disturb the
exisitng sewer connections including earth work excavation and all leads and lifts, laying
new main, refilling the trenches, incluidng cost, all taxes and duties and conveyance of all
materials to site, labour charges etc., complete as directed by the departmental officers.

4805

110mm dia PVC lines


Supply and fixing of precast RCC chambers having the size of 910mm at bottom and
530mm at top with tapers along with FRC cover and frame, laying in CC (1:2:4) prop
including cost of material, labour charges, curing, conveyance etc., complete as per
standard specifications and standard drawings..

For up to 200mm dia Sluice valves and for revamping pipe lines
Construction of Valve chambers with Cement Concrete vertical walls and RCC slab
fitted with FRC man hole cover and frame, etc including cost and conveyance of all
material, labour charges, curing etc., complete as per standard specifications and
standard drawings..

306

306

for 250mm dia to 350 Sluice valves


for 400mm dia to 600 Sluice valves

1
1

X
X

13
0

13
0

Dist-AC-DI-100 to 400 - 337269598.xlsx

1027.00
685.00
342.00

1027.00
685.00
342.00

5.00

24025.00

1712.00

1712.00

2735

Page 2736 of 3205

S. N.

Description of Item

41

Carting away the surplus excavated material i.e.Earth and Rubble from the site to a
suitable distance of about 10.00 Km including loading, unloading , conveyance charges
and dumping the carted material at the contractors cost, labour charges, all leads & lifts
and other incidental and operational charges etc., complete.

a
b

90% of rock Qty


Earth- 70% of Thrust block Qty

42

Dewatering pipe line trenches etc, duly bailing out water from the pipe line trenches with
oil engine driven pumpsets, including hire charges, fuel charges and wages for Driver and
Helper and all other incidental and operational charges including suction and delivery
hose, lead of drain in to natural drain etc, complete.

No

44

Quantity

#REF!
32.00
#REF!

Assuming ---- days requiring for dewatering in full rainy season and requiring 5 HP Pump
sets at 8 places for 8 hours pumping per day.
43

days

Places

HP

Hours

23

8.00

137

126040.00

1
1
1
1
1
1
1

X
X
X
X
X
X
X

4
2
7
0
3
1
0

4
2
7
0
3
1
0

69

69

PHE-CCIP-23
Cutting C.I./ DI / MS Pipes without water in mains where ever required (.Dia of pipes in
mm.)
100mm dia DI K7 pipe
150mm dia DI K7 pipe
200mm dia DI K7 pipe
250mm dia DI K7 pipe
300mm dia DI K7 pipe
350 mm dia DI K7 Pipe
400 mm dia DI K7 Pipe
Manufacture, supply and erection of air valve guard cabins of size 0.90 x 0.90 x 0.90 m
made with 4 numbers vertical and 8 numbers horizontal MS angles of size 75 x 75 x 6mm
and 10mm dia MS square bars fixed at 7.50cm c/c with door and locking arrangements as
per approved drawing and as directed by the departmental officer and painting both sides
with anti-corrossive paint two coats over one coat of primary coat including cost of all
material, fabrication, welding, transportation etc., complete

Dist-AC-DI-100 to 400 - 337269598.xlsx

2736

Page 2737 of 3205

S. N.

Description of Item

45

Providing and fixing 1.50 m long cold twisted deformed steel Anchor rods with 0.75m
length driven in to the hole drilled in bed rock and remaining length embedded in
concrete/ masonry including cost of all materials, machinary, labour, drilling and cleaning
hole, driving Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to
50m and all lifts.

46

47
48

49
a
b
50

No

Quantity

for providing reinforcement to anchor bars over sheet rock, where excavation is not
possible
Railway crossing/road crossing/canal crossing by trenchless technology tunneling work
through specialized pipe jacking method in co-ordination with concerned authorities for as
per approved drawings, installing to correct level gradient and alignment by hydraulic pipe
jacking technique complete including tunneling excavation drive and receive pits,
excavation and all machines transportation charges and other required materials and
including cost of encasing pipe

456

456

Road crossing - 800mm dia


Inter connections between existing and newly proposed pipe lines including all labour
charges but excluding material.
Shifting and errection of electric poles, telephone poles coming across the proposed
alignment of the pipeline.
Electrical poles
Cables
Road cutting charges payble to R&B Dept.
Cutting of BT Road
Cutting of Berms
Laying of Service lines for facilitating connections to properties including cost and
conveyance of all material and all labour charges etc, complete.

1
1

X
X

1
14

1
1

X
X

91
1

3423.00

91
3423.00

1
1

X
X

1
1

1369.00
3851.00

1369.00
3851.00

100mm dia AC class- 15 pipe

10382.00

10382.00

110.00

110.00
14

Total

Dist-AC-DI-100 to 400 - 337269598.xlsx

2737

Page 2738 of 3205

ntity

Rate

Per

Amount

Cum

WS S.No 1

Sqm

89.44

1 Sqm

#REF!

WS S.No 2

Dist-AC-DI-100 to 400 - 337269598.xlsx

2738

Page 2739 of 3205

ntity
Cum

Rate
2484.08

Per
1 Cum

Amount
#REF!

Dist-AC-DI-100 to 400 - 337269598.xlsx

2739

Page 2740 of 3205

ntity

Rate

Per

Amount

WS S.No 3

Cum

305.40

1 Cum

#REF!

1 Cum

#REF!

1 Cum

#REF!

WS S.No 5

Cum

120.82

WS S.No 6

Cum

189.06

Dist-AC-DI-100 to 400 - 337269598.xlsx

2740

Page 2741 of 3205

ntity

Rate

Per

Amount

WS S.No 4

Cum

263.64

1 Cum

#REF!

1 Cum

#REF!

1 Cum

7146.00

WS S.No 7

Cum

1007.47

WS S.No 8

Cum

158.81

WS S.No 9

Dist-AC-DI-100 to 400 - 337269598.xlsx

2741

Page 2742 of 3205

ntity
Sqm

Rate

Per
80.60

1 Sqm

Amount
1655605.00

Dist-AC-DI-100 to 400 - 337269598.xlsx

2742

Page 2743 of 3205

ntity

Rate

Per

Amount

WS S.No 10

Rmt

149.99

1 Rmt

2053813.00

1 Cum

#REF!

1 Rmt
1 Rmt

#REF!

WS S.No 12

Cum

1285.16

AC pipes S.No 2

Rmt
Rmt

#REF!

Dist-AC-DI-100 to 400 - 337269598.xlsx

2743

Page 2744 of 3205

ntity

Rate

Per

Amount

data- AC pipes

Nos
Nos

#REF!

1 Nos
1 Nos

#REF!

1 Nos
1 Nos

#REF!

data- AC pipes

Nos
Nos

#REF!

CI -Spe.

Dist-AC-DI-100 to 400 - 337269598.xlsx

2744

Page 2745 of 3205

ntity

Rate

Per

Amount

Kg

#REF!

1 Kg

#REF!

Kg

139.75

1 Kg

602916.00

Lowering S.No 1

Rmt
Rmt

87.56
115.20

1 Rmt
1 Rmt

3871465.00
2576563.00

Dist-AC-DI-100 to 400 - 337269598.xlsx

2745

Page 2746 of 3205

ntity

Rate

Per

Amount

DI pipes S.No A-2


&3

Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt

1097.16
1512.20
2101.47
2821.63
3647.50
4584.27
5560.29

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

730160.00
507343.00
2531221.00
0.00
1905819.00
832045.00
0.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

17134.00
12557.00
54844.00
0.00
40482.00
17783.00
0.00

DI pipes S.No 15

Nos
Nos
Nos
Nos
Nos
Nos
Nos

141.60
205.86
250.43
279.28
426.13
538.89
588.71

Dist-AC-DI-100 to 400 - 337269598.xlsx

2746

Page 2747 of 3205

ntity

Rate

Per

Amount

Lowering S.No 1

Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt

27.09
44.12
64.14
86.66
112.09
140.59
171.58

1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt
1 Rmt

18028.00
14802.00
76391.00
0.00
57951.00
24744.00
0.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

11706.00
7304.00
28896.00
0.00
16426.00
6610.00
0.00

Lowering S.No 3

Nos
Nos
Nos
Nos
Nos
Nos
Nos

96.74
119.73
133.16
152.02
174.74
206.55
205.52

DI-Spe-1 S.No I-a

Dist-AC-DI-100 to 400 - 337269598.xlsx

2747

Page 2748 of 3205

ntity

Kg

Rate

151.78

Per

1 Kg

Amount

1335209.00

Dist-AC-DI-100 to 400 - 337269598.xlsx

2748

Page 2749 of 3205

ntity

Rate

Per

Amount

Kg

151.78

1 Kg

547015.00

Kg

151.78

1 Kg

1615091.00

Kg

151.78

1 Kg

2018067.00

Dist-AC-DI-100 to 400 - 337269598.xlsx

2749

Page 2750 of 3205

ntity

Kg

Rate

151.78

Per

1 Kg

Amount

78015.00

Dist-AC-DI-100 to 400 - 337269598.xlsx

2750

Page 2751 of 3205

ntity

Rate

Per

Amount

Valves S.No-III

Nos
Nos
Nos
Nos
Nos
Nos
Nos

19147.19
30147.18
50097.52
69386.62
104867.72
317505.67
333014.49

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

3389053.00
3738250.00
250488.00
485706.00
629206.00
317506.00
0.00

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

23286.00
27647.00
1839.00
3659.00
4465.00
1257.00
0.00

1 Nos
1 Nos
1 Nos
1 Nos

109138.00
122162.00
5390.00
10946.00

Valves S.No VI

Nos
Nos
Nos
Nos
Nos
Nos
Nos

131.56
222.96
367.84
522.74
744.23
1256.85
1543.14

Valves S.No VII

Nos
Nos
Nos
Nos

308.30
492.59
538.99
781.89

Dist-AC-DI-100 to 400 - 337269598.xlsx

2751

Page 2752 of 3205

ntity
Nos
Nos
Nos

Rate
820.42
1183.95
1888.73

Per
1 Nos
1 Nos
1 Nos

Amount
9845.00
2368.00
0.00

Dist-AC-DI-100 to 400 - 337269598.xlsx

2752

Page 2753 of 3205

ntity

Rate

Per

Amount

Valves S.No V

Nos
Nos

47345.70
63163.20

1 Nos
1 Nos

3219508.00
63163.00

1 Nos
1 Nos

17430.00
300.00

1 Cum

135100.00

1 Cum

39625.00

1 Cum

108313.00

Valves S.No VIII

Nos
Nos

256.32
299.94

WS S.No 29

Cum

328.71

WS S.No 30-a

Cum

404.34

WS S.No 31

Cum

1259.45

Dist-AC-DI-100 to 400 - 337269598.xlsx

2753

Page 2754 of 3205

ntity

Rate

Per

Amount

WS S.No 13

Cum

4138.13

1 Cum

11349649.00

1 Cum

833884.00

WS S.No 14-a

Cum

6932.86

Dist-AC-DI-100 to 400 - 337269598.xlsx

2754

Page 2755 of 3205

ntity

Rate

Per

Amount

WS S.No 15

Cum

6063.47

1 Cum

25125079.00

1 Rmt
1 Rmt
1 Rmt

117961.00
124771.00
121362.00

1 Rmt
1 Rmt
1 Rmt

180547.00
130758.00
127172.00

WS S.No 17 b,c &


d

Rmt
Rmt
Rmt

57.43
72.88
88.65

WS S.No 18

Rmt
Rmt
Rmt

35.16
42.44
46.43

Dist-AC-DI-100 to 400 - 337269598.xlsx

2755

Page 2756 of 3205

ntity

Rate

Per

Amount

WS S.No 19

Rmt
Rmt
Rmt

30.90
34.18
36.36

1 Rmt
1 Rmt
1 Rmt

31734.00
23413.00
12435.00

1 Rmt

4883322.00

1 Rmt

558557.00

1 Nos

1506744.00

1 Nos
1 Nos

361452.00
0.00

WS S.No 28

Rmt

203.26

WS S.No 31

Rmt

326.26

Chamber-I S.No I4

Nos

4924.00

Chamber-I S.No II6

Nos
Nos

27804.00
41393.00

Dist-AC-DI-100 to 400 - 337269598.xlsx

2756

Page 2757 of 3205

ntity

Rate

Per

Amount

WS S.No 18-a

Cum

51.70

1 Cum

#REF!

WS S.No 19

Hp.hr

60.22

1 Hp.hr

7590129.00

WS S.No 35

Nos
Nos
Nos
Nos
Nos
Nos
Nos

75.80
142.13
189.51
236.89
284.26
276.37
315.85

1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos
1 Nos

303.00
284.00
1327.00
0.00
853.00
276.00
0.00

1 Nos

565874.00

WS S.No 23

Nos

8201.07

Dist-AC-DI-100 to 400 - 337269598.xlsx

2757

Page 2758 of 3205

ntity

Rate

Per

Amount

Bld.S.No.75

Nos

368.65

1 Nos

168104.00

WS S.No 42

Rmt
Nos

48272.16
10000.00

1 Rmt
1 Nos

5309938.00
140000.00

Nos
Rmt

as per Quotation
4500.00
41.00

1 Nos
1 Rmt

409500.00
140343.00

Rmt
Rmt

5000.00
500.00

1 Rmt
1 Rmt

6845000.00
1925500.00

1 Rmt

#REF!

WS S.No 43.a

Rmt

#REF!

Rs.
Say Rs.

#REF!
#REF!

Dist-AC-DI-100 to 400 - 337269598.xlsx

2758

Name of work: Construction of Main Bulding (Block-I) Training Center and Ladies Hostel Buildings (Block-II) f
Department.
Water Supply Data
Description of Item
Unit
2
3
Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or
'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat
cover of approved make with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection
pipe wall flanges all of approved make etc. complete for finished item of work in all respects: Special Colour Grade - III

S.No.
1
1

BMW-D-20
BMW-D-12

Rate as per SSR item No.152


Labour charges only for fixing low down porcelain flushing tank with internal components as per SSR - 144

Each
Each

BMW-D-17

Labour charges only for fixing plastic seat and lid for European water closet as per SSR - 149
Each

0.4 Add 40% on labour charges


0.14 Add 14% for Contractor profit

Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or
'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat
cover of approved make with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection
pipe wall flanges all of approved make etc. complete for finished item of work in all respects: Special Colour Grade - II

BMW-D-19
BMW-D-12

Rate as per SSR


Labour charges only for fixing low down porcelain flushing tank with internal components as per SSR 144

BMW-D-17

Labour charges only for fixing plastic seat and lid for European water closet as per SSR 149

Each
Each
Each

0.40 Add 40% on labour charges


0.14 Add 14% for Contractor profit

Supply & fixing 580mm x 440mm size white virerous orissa pan with attached footrests of approved make
confirming to IS 2556 (part - III) with 'P' or 'S' trap, including 10 lit. low level PVC flusihing system confirming to IS
7231 with all internal fittings, CI brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connerctor,
15mm dia Cp brass strop cock 300 grams of ISI make, cutting and making good the walls and floors wherever
required including cost & conveyance of all material to work site, all labour charges for all operations for fixing
etc., complete for finished item of work.

BMW-D-04
BMW-D-09

Rate as per SSR


Providing Brick masonry seat for Orissa pan/ Indian W.C. using 2nd class bricks as per standard practice

BMW-G.08

Supply & fixing of PVC low level system parry ware, slim line with internal components & short bend: 10 Litres
capacity Single Flush
Supplying & Fixing 12.7 mm PVC connection with brass union nut C.P coated
NP brass stop cock 300 gms 12.70mm item
Labour charges for fixing orisa pan
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

Each
Each

BMW-I.48
BMW-E.15
BMW-D-06
0.4
0.140

Each
Each
Each
Each

S.No.
1
4

Description of Item
Unit
2
3
Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with
parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap
of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets
including wooden block: 660 x 460 mm - Single C.P. Pillar cock

Each
Rate as per SSR
Labour charges only for fixing Indian make Flat Back Wash Hand Basin with waste fittings like rubber plug, chain,
32 mm nominal size C.P. Fitting Pillar Taps complete with standard CI brackets including wooden block -160
Each
BMW-D-29 Supplying and Fixing Pedestal for Wash Hand Basin (H.S.W / Parry / Earthenware)-161
Each
Each
BMW-D-30 Labour charges only for fixing pedestal for wash hand basin -162
0.4 Add 40% on labour charges
0.140 Add 14% for Contractor profit
Sundries
BMW-D-21
BMW-D-06

BMW-E.07
BMW-E.08
0.4
0.140

BMW-G.119
0.140

BMW-G.11
0.140

BMW-G.12
0.140

BMW-A.72

Supply & fixing of tested NP bib taps at all levels of 12.70mm dia of Indian make first quality including cost &
conveyance of all materials, labour charges for finished item of work complete for all floors
S&F 12.7 mm N.P bib tap Indian make 400 grams Seiko/ Senior/ Nice or equivalent
Labour Charges
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

Each
Each

Supplying and fixing 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings of standard make of ISI
Brand ncluding fixing in CM1:3 prop. and cost and conveyance of all materials at site complete for finished item
of work.
Each
Basic rate
Add 14% for Contractor profit
Sundries
Providing & fixing UPVC SWR pipes TYPE-B conforming to IS 13592:1992 including necessary
specials,jointing with adhesives ,fixing vertical pipes over wooden battens including cost and conveyance of all
materials at site complete for finished item of work.
75 mm dia.
Basic rate for 3.0 m length
Add 14% for Contractor profit
Cost for 3m length
Rate per 1 RMT
Sundries
110 mm dia.
Basic rate for 3.0 m length
Add 14% for Contractor profit
Cost for 3m length
Rate per 1 RMT
Sundries
Rate per 1 RMT

Each

Each

Supply & fixing SWG 150x100mm gully trap of 1st class as per IS standards with CI grating and constructing
brick masonry chamber of size 50x35x30cm in CM 1:6 prop. Over CC 1:5:10 prop. Bed of size 50x5x10cm and
plastering 12mm thick in CM 1:4 prop. To both inside & outside surfaces of the brick chamber and fitted with
30x22.5cm CI frame and hinged cover.
Basic rate

Each

S.No.
1
0.14

BMW-B.01
0.14

10

Description of Item
2
Add 14% for Contractor profit
Sundries
Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing
strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted
with 20 dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts
of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C.
1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all
incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing
etc., complete for finished item of work as per Standard specification.

Basic rate
Add 14% for Contractor profit
Sundries

16 mm OD pipe
Basic rate
Add 14% for Contractor profit
Sundries

BMW-I.204
0.14

20 mm OD pipe
Basic rate
Add 14% for Contractor profit
Sundries

BMW-I.207
0.14

40 mm OD pipe
Basic rate
Add 14% for Contractor profit
Sundries

BMW-I.208
0.14

50 mm OD pipe
Basic rate
Add 14% for Contractor profit
Sundries

BMW-F.19
BMW-F.20
0.4
0.14

Each

Supplying and fixing KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure pipes


conforming to IS-15450-2004 with UV stabilized, carbon black for hot & cold water supply, capable to withstand
pressure up to 80 C including all special composite fittings, plastic & brass blend inserts for elbows, tees,
reducers, couplers, connectors etc complete for external works including laying pipes, fixing in position, testing
and commissioning etc :

BMW-I.203
0.14

11

Unit
3

1 Rm

1 Rm

1 Rm

1 Rm

Providing & fixing GM gate /ball valve as per IS standards including cost & conveyance of all material to work
spot and all labour charges including fixing in position for finished item of work.
20 mm dia.
Basic rate
Labour Charges
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

Each
Each

S.No.
1

Description of Item
2

12

Supply and Fixing 609.6 x 457.2 x 254 mm RCC Terrazzo finished sink ( or constructed at site with 50.8mm
thick ) brass plug and chain including CI Cantilever brackets.

BMW-D.40
BMW-D.41
0.4
0.14

Basic rate
Labour Charges
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

13
BMW-D.31
BMW-D.32
0.4
0.14

Supplying & Fixing 31.75 mm C.P bottle trap (Heavy type) Parryware or equivalent
Basic rate
Labour Charges
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

14

Unit
3

Each
Each

Each
Each

Supply and Fixing 31.75mm dia PVC flexible waste pipe of 914.4mm length of 1st quality.(SSR No.315)

BMW-G.05
0.14

15

Basic rate
Add 14% for Contractor profit
Sundries

Each

Providing of PVC casing pipe 160 mm dia of 6 Kg / cm2 including cost of labour & materials

P/294 (PH)
0.103
0.04
0.14

Basic rate
CED @ 10.3%
Sales Tax @4%
Add 14% for Contractor profit
Sundries

Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of estimate.
The resin cost adopted for the above rates is Rs.55,950/- per MT (Basic rate, excluding CED)
16

Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock

BMW-A.01
0.14

17

requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping
Basic rate
Add 14% for Contractor profit
Sundries

1 RM

Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with
standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with

BMW-D.35
BMW-D.36

screws complete Indian make (HSW/Parry/Neycer) : 590 x 375 x 390 mm


Rate as per SSR SI no.167
Labour charges only Fixing flat back Bowl/ Half stall urinals with fixing C.P. Spreader and screws complete

Each
Each

0.4 Add 40% on labour charges


0.14 Add 14% for Contractor profit
Sundries
18

Supplying & Fixing 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium
screws

S.No.
1
BMW-I.20
BMW-I.21
0.4
0.14

19
BMW-I.159
0.14

20
BMW-I.161
0.14

21
a)
BMW-F.35
BMW-F.36
0.4
0.14

b)
BMW-F.37
BMW-F.38
0.4
0.14

22

BMW-C.41
BMW-C.42
0.4
0.14

23

BMW-A.72
BMW-A.73
0.4
0.14

Description of Item
2
Rate as per SSR No.614
Labour charges
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

Unit
3
Each
Each

Supply & fixing soap dish Jaquar make queen series: with 7 years warranty: Chrome plated complete for
finished item of work.
Rate as per SSR SI no. 753
Each
Add 14% for Contractor profit
Sundries

Supply & fixing of toilet paper holder Jaquar make Queen series. with 7 years warranty: Chrome plated
complete for finished item of work.
Rate as per SSR SI no. 755
Each
Add 14% for Contractor profit
Sundries

Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty - 25
mm NB Size
25mm dia
Rate as per SSR SI no.246
Each
Labour charges
Each
Add 40% on labour charges
Add 14% for Contractor profit
Sundries
40mm dia
Rate as per SSR SI no. 248
Labour charges
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

Each
Each

Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing
with white cement as per site requirements with standard practice for 100 mm dia Inlet- 75 mm (3") outlet pipe - 4
Kgs
Each
Rate as per SSR SI.No 126
Labour charges only for fixing CI Nahany/ Floor traps with C.P. Grating fixing with white cement as per site
requirements with standard practice
Each
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost.
Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame
and hinged cover
Each
Rate as per SSR SI.No72
Each
Labour charges only
Add 40% on labour charges
Add 14% for Contractor profit
Sundries

ldings (Block-II) for Disabled Welfare

Rate Rs
4

Amount Rs
5

12100.00

12100.00

350.00
50.00
400.00
12260.00
Rs.

9500.00

160.00
1716.40
13976.40 Each

9500.00

350.00
50.00
400.00
9660.00
Rs.

160.00
1352.40
11012.40 Each

915.00

915.00

220.00

220.00

1150.00
74.00
150.00
250.00
250.00
2609.00

1150.00
74.00
150.00

Rs.

100.00
365.26
0.04
2974.30 Each

Rate Rs
4

Amount Rs
5

1750.00

1750.00

250.00
810.00
90.00
340.00
2696.00
Rs.

300.00
20.00
20.00
308.00
Rs.

114.00
114.00
Rs.

202.00
202.00

810.00
136.00
377.44
0.01
3073.45 Each

300.00
8.00
43.12
0.03
351.15 Each

114.00
15.96
0.04
130.00 Each

202.00
28.28
230.28
76.76
0.04
76.80

RMT

Rs.

320.00
44.80
364.80
121.60
0.00
121.60

RMT

419.00

419.00

Rs.
320.00
320.00

Rate Rs
4
419.00
Rs.

4648.00
4648.00
Rs.

134.00
Rs.

165.00
165.00
Rs.

365.00
365.00

465.00
465.00

360.00
31.00
31.00
372.40

Amount Rs
5
58.66
0.04
477.70 Each

4648.00
650.72
0.03
5298.75 Each

134.00
18.76
0.04
152.80

RMT

165.00
23.10
0.00
188.10

RMT

365.00
51.10
0.00
416.10

RMT

465.00
65.10
0.00
530.10

RMT

360.00
12.40
52.14
0.01

Rate Rs
4
Rs.

510.00
160.00
160.00
574.00
Rs.
320.00
35.00
35.00
334.00
Rs.

21.00
21.00
Rs.

347.00
347.00
382.74
398.05
Rs.

248.00
248.00
Rs.

2000.00
100.00
100.00
2040.00
Rs.

Amount Rs
5
424.55 Each

510.00
64.00
80.36
0.04
654.40 Each
320.00
14.00
46.76
0.04
380.80 Each

21.00
2.94
0.01
23.95 Each

347.00
35.74
15.31
55.73
0.02
453.80

RMT

248.00
34.72
0.03
282.75 RMT

2000.00

40.00
285.60
0.00
2325.60 Each

Rate Rs
4
121.00
31.00
31.00
133.40
Rs.

1234.00
1234.00
Rs.

1040.00
1040.00
Rs.

497.00
48.00
48.00
516.20
Rs.
1092.00
80.00
80.00
1124.00
Rs.

243.00
39.00
39.00
258.60
Rs.

419.00
18.00
18.00
426.20
Rs.

Amount Rs
5
121.00
12.40
18.68
0.02
152.10 Each

1234.00
172.76
0.04
1406.80 Each

1040.00
145.60
0.00
1185.60 Each

497.00
19.20
72.27
0.03
588.50 Each
1092.00
32.00
157.36
0.04
1281.40 Each

243.00

15.60
36.20
0.00
294.80 Each

419.00
7.20
59.67
0.03
485.90 Each

Name of work: Construction of Main Bulding (Block-I) Training Center and Ladies Hostel Buildings
Sanitary & Water Supply Abstract Estimate
S.No
1
1

S.No
7

10

11

a)
b)
12

13

S.No
14

a)
b)
c)
c)
15

16

17

18

19

20

21

22

S.No
23

Name of work: Construction of Main Bulding (Block-I) Training Center and Ladies Hostel Buildings (Bloc
Sanitary & Water Supply Abstract Estimate
Description of Item
2
Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual flush
porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber
buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete
for finished item of work in all respects: Special Colour - Grade - III

Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual flush
porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber
buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete
for finished item of work in all respects: Special Colour - Grade - II

Supply & fixing 580mm x 440mm size white virerous orissa pan with attached footrests of approved make confirming to IS 2556
(part - III) with 'P' or 'S' trap, including 10 lit. low level PVC flusihing system confirming to IS 7231 with all internal fittings, CI
brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connerctor, 15mm dia Cp brass strop cock 300 grams of ISI
make, cutting and making good the walls and floors wherever required including cost & conveyance of all material to work site,
all labour charges for all operations for fixing etc., complete for finished item of work.

Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/
Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 660 x 460 mm - Single C.P. Pillar
cock

Supply & fixing soap dish Jaquar make queen series: with 7 years warranty: Chrome plated complete for finished item of work.

Supply & fixing of toilet paper holder Jaquar make Queen series. with 7 years warranty: Chrome plated complete for finished
item of work.

Description of Item
Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of
overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make
(HSW/Parry/Neycer) : 590 x 375 x 390 mm

Supplying & Fixing 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws

Supply & fixing of tested NP bib taps at all levels of 12.70mm dia of Indian make first quality including cost & conveyance of all
materials, labour charges for finished item of work complete for all floors

Supplying and fixing 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings of standard make of ISI Brand ncluding
fixing in CM1:3 prop. and cost and conveyance of all materials at site complete for finished item of work.

Providing & fixing UPVC SWR pipes TYPE-B conforming to IS 13592:1992 including necessary specials,jointing with
adhesives ,fixing vertical pipes over wooden battens including cost and conveyance of all materials at site complete for
finished item of work.
75mm dia
110mm dia
Supply & fixing SWG 150x100mm gully trap of 1st class as per IS standards with CI grating and constructing brick masonry
chamber of size 50x35x30cm in CM 1:6 prop. Over CC 1:5:10 prop. Bed of size 50x5x10cm and plastering 12mm thick in CM
1:4 prop. To both inside & outside surfaces of the brick chamber and fitted with 30x22.5cm CI frame and hinged cover.

Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar
(1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm
including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with 20 dia RCC manhole covers and
frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete
(1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard
specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage
charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift
charges, curing etc., complete for finished item of work as per Standard specification.

0.90m (upto 3' depth) deep including CI cover with frame (medium weight 40kg) 500mm internal diameter.

Description of Item
Supplying and fixing KITEC Polyethylene-Aluminium-Polyethylene (PE-AL-PE) composite pressure pipes conforming to IS15450-2004 with UV stabilized, carbon black for hot & cold water supply, capable to withstand pressure up to 80 C including all
special composite fittings, plastic & brass blend inserts for elbows, tees, reducers, couplers, connectors etc complete for
external works including laying pipes, fixing in position, testing and commissioning etc :

16 mm OD
20 mm OD
40 mm OD
50 mm OD
Providing & fixing GM gate /ball valve as per IS standards including cost & conveyance of all material to work spot and all labour
charges including fixing in position for finished item of work.
20mm dia
Supply and Fixing 609.6 x 457.2 x 254 mm RCC Terrazzo finished sink ( or constructed at site with 50.8mm thick ) brass plug
and chain including CI Cantilever brackets.

Supplying & Fixing 31.75 mm C.P bottle trap (Heavy type) Parryware or equivalent

Supply and Fixing 31.75mm dia PVC flexible waste pipe of 914.4mm length of 1st quality.(SSR No.315)

Providing of PVC casing pipe 160 mm dia of 6 Kg / cm2 including cost of labour & materials

Supplying & fixing Gunmetal (GM) Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty - 25 mm NB Size
25mm dia
40mm dia
Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in
CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

Supplying & fixing CI Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement
as per site requirements with standard practice for 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs

Description of Item
Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement
joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524
mm(5'0") depth and refilling with watering and tamping

s (Block-II) for Disabled Welfare Department.

Quantity

Unit

Rate Rs.

Amount Rs.

Each

13976.40

55906.00

24

Each

11012.40

264298.00

6.00

Each

2974.30

17846.00

22.00

Each

3073.45

67616.00

5.00

Each

1406.80

7034.00

5.00

Each

1185.60

5928.00

Quantity

Unit

Rate Rs.

Amount Rs.

15.00

Each

2325.60

34884.00

7.00

Each

152.10

1065.00

50.00

Each

351.15

17558.00

50.00

Each

130.00

6500.00

110.00
120.00

RMT
RMT

76.80
121.60

8448.00
14592.00

20.00

Each

477.70

9554.00

25.00

Each

5298.75

132469.00

Quantity

Unit

Rate Rs.

Amount Rs.

120.00
160.00
80.00
100.00

RMT
RMT
RMT
RMT

152.80
188.10
416.10
530.10

18336.00
30096.00
33288.00
53010.00

25.00

Each

424.55

10614.00

4.00

Each

654.40

2618.00

20.00

Each

380.80

7616.00

35.00

Each

23.95

838.00

80.00

RMT

453.80

36304.00

12.00
20.00

Each
Each

588.50
1281.40

7062.00
25628.00

35.00

Each

485.90

17006.00

35.00

Each

294.80

10318.00

Quantity

Unit

Rate Rs.

Amount Rs.

400.00

RMT

282.75

113100.00

Rs.

1009532.0

DATA - BORE WELLS AND PUMP SETS


Rates as per RC Agreement No. TO/08/2011-12, Dt.03.08.2010

Sl.N
o
1

Description

Qty

Rate

Drilling of Bore well by down the hole hammer (DTH) drilling to finished dia of 163 mm in all formations to the depth
bores to the required dia flushing the bore walls at an average pressure of 7 kg/cm2 (100 PSI) conducting yield test, incl
point to point, crew charges, cost of consumables, shifting of Rig and all other charges etc,.The bore wells should b
should be carried out to the satisfaction of the department and carried out as per IS 2800 I & II / 1979 and amendmen
the rate is including all taxes etc,. complete as applicable.

Rate as per the Rate contract by the SE (RWS) RR District vide Agreement No. TO/08/2011-12, Dt.03
Rate up to 90.00 Mts. Depth
for every 1.00m length after 90.00m @10% extra
2

305.00

1.1 Rmt

305.00

Supply and fixing of 180 mm dia PVC casing pipe 6kg/cm2 including cost and conveyance of all materials, labour
finished item of works.
Rate worked out as per 2009-10 SSR

1 Rmt

1 Rmt

Supply and delivery,of submersible pumpsets suitable to 150mm dia Borewell coupled with
motors Single phase 2880 RPM 340V(-15%+10% range-290 to 375 Volts) / 3 Phase 2880 RPM
400V(-15%+10% range-340 to 440 Volts) of reputed make with minimum overall efficiency of
40% at the duty point with Radial / mixed flow with a trail run of One week.The pumpset should
confirm to IS 8034/2002 & 9283/1995 with up to date amendments with ISI mark and a
guarantee period of 18 months from the date of installation. The rates are inclusive of ,
transportation, installation, errection of pumpsets but excluding APGST, duties and accessories
etc, complete.

Rate as per RC & separate sheet enclosed

574.80

Supply and delivery of wall mounted Industrial type Control panel board of size
600x600x250mm made of 18 SWG CRCA sheet steel enclosure, 14 SWG mounting palte for
cable entry fabricated, painted with two coats of red Oxide primer and two coats of final light
Grey paint, lock and key arrangements two side lovures with weld mesh inside etc., completed
consisting of the follwing equipment with all internal wiring using Fine cab.Finolex cables of
suitable size and capacity and cable clamps etc., complete for 3-phase power pumps of 415 V50 HZ for delivery at any where in A.P.
a). Volt Meter : 0-500 V 96x96mm size 1 No.
b).Ammeter: 0-20 A-1- No.(96x96mm size) upto 7.50HP - 1 No
c), Dry running preventor with elecytrode of suitable range 1 No.
d). Single phasing preventor 1 No.
e). Swith fuse unit with HRC fuses IP & N confirming to IS 4064- 1 set ( 32 AMPS up to 7.5 HP)
f). Indication Lamps(R-Y-B) with dropper resistance 230V-1 set.
g) Holder with Switch controle - 1 No.
h).Voltmeter selector switch - 1 No.
i). Starters-direct-on-line starter in sheet steel enclosure suitable upto 7.50HP motor rating Ac-3duty,415V,50Hz 3 phase.
j). Supply and delivery of capacitor as per APSEB rules for LT connections as per IS: 2834 with
dropper resistance, data connection- 2 KVAR suitable above 3 HP to 6HP and 3 KVAR above 6
HP to 9 HP)

Rates as per RC Agreement No. TO/08/2011-12, Dt.03.08.2010


up to 7.50 HP with DOL starter and suitable range of capacitor and swith
fuse unit including all accessories

1 No

6110.00

above 7.50 and up to 10.00 HP with fully atomatic star delta starter and
suitable range of capacitor and swith fuse unit including all accessories

1 No

6800.00

above 10.00 HP with fully atomatic star delta starter and suitable range
of capacitor and swith fuse unit including all accessories

1 No

10000.00

Supply abd delivery of PVC insulated and PV sheated flexible 3 core flat type submersible
cables suitable for submersible pumpsets conductors composed of ennealed high conductivity
copper wire, conforming to IS 694 with its revisions and ammendments from time to time and
delivery at site of installation of pumpset including central excise duty freight and transit
insurances etc., complete (in small quantities) but exclussive APGST

a
b
c

3 Core 1.5 Sqmm Flat cable


3 Core 2.5 Sqmm Flat cable
3 Core 4.00Sqmm Flat cable

1 Rmt
1 Rmt
1 Rmt

53.00
66.00
88.00

3 Core 6.00Sqmm Flat cable

1 Rmt

135.00

22

a
b
c

Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall
including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions
etc. with necessary excavation in all types of soils except rock requiring blasting, refilling,
chasing masonry walls and making good the walls & floors to the originals, surface and fixing
MS clamps of TW block on walls, including cost and conveyance of all materials and labour
charges complete for finished item of work.

50 mm dia nominal bore


65 mm dia nominal bore
80 mm dia nominal bore
6

10

11

1 Rmt
1 Rmt
1 Rmt

300.00
365.00
440.00

Manufacture, supply, & delivery of 16Kg/Sqcm HDPE pipes conforming to IS 4984 - 1995
including transportation to any where in A.P, excise duty, sale tax etc., complete.
Rate worked out as per 2009-10 SSR
40mm dia
1 Rmt
50mm dia
1 Rmt
63 mm dia
1 Rmt
Supply and delivery of GaIvanised Mild Steel bends heavy duty C class threaded at both ends
with arm length of 20 Cms. (Centre to Face) including cost and conveyance, transit insurance
all labour charges and taxes and duties etc., complete.

11.48
17.78
28.00

40mm dia(32mm dia Rate adopted)


1 No
50mm dia
1 No
65mm dia
1 No
Supply and delivery of MS Clamp set 45mm length,12mm thick plate, 75mm wide with 6Nos of
16mm dia Bolts & Nuts at site of work for pump installation including cost and conveyance of all
materials, all taxes and duties and transit insurance etc, complete.

70.00
100.00
135.00

40mm dia(32mm dia Rate adopted)


1 No
50mm dia
1 No
Supply , delivery and fixing of 12" long S/S Nippals, including all labour charges and taxes and
duties etc, complete

275.00
390.00

40mm dia(32mm dia Rate adopted)


1 No
50mm dia
1 No
65mm dia
1 No
Supply and delivery of Gate Valves leaded in tin bronze screwed internal bends, screwed on
bonnet internal seat design to IS 778/ 84 with its ammendments class - 2 of sizes ISI Marked
including cost and conveyance, transit insurance all labour charges and taxes and duties etc.,
complete.

75.00
70.00
150.00

40mm dia
1 No
50mm dia
1 No
Manufacture, Supply and fixing of Galvanised Mild steel couplings of the fallowing sizes
40mm dia
50mm dia

1 No
1 No

400.00
1250.00

40.00
72.00

12

Supply & Delivery of CI Non-return Valve with ISI Mark. including cost and conveyance, transit
insurance all labour charges and taxes and duties etc., complete.
40mm dia
1 No
50mm dia
1 No
Supply & fixing of 50mm Dia MS Galvanised Bore Cover including cost and conveyance, transit
insurance all labour charges and taxes and duties etc., complete

350.00
650.00

150mm dia
1 No
Supply and Delivery of MS Angular Stand for fixing of control Panel Board - MS Angular stand
consisting of L Angles of size 40mm x 40mm x 5mm with 2 nos. 6'long verticals and 3 nos. - 2
1/2' long horizontals. The two legs of the stand firmly fixed in Cement Concrete bed in CC
(1:2:4) prop. of size 1m x 0.3m x 0.2m depth below Ground Level. including cost and
conveyance, transit insurance all labour charges and taxes and duties etc., complete

150.00

1 No
Providing independent Earthing for the Pumpset/ motor using 40mm dia B class GI Pipe of 2m
length duly providing 12mm dia 16nos holes and required bolts, nuts and washers, check nuts
humbe pipe ring etc., as per IS specifications with necessary double GI wire no.8 SWG
including filling with equal proportion of salt and Charcoal in layers and all labour charges etc.,
complete.

800.00

1300.00

16

1 No
Supply and Delivery of 7/20 Service Wire of repute make as per IS Code including cost and
conveyance, transit insurance all labour charges and taxes and duties etc., complete.
1 Rmt
Manufacture, supply, delivery of HDPE pipes conforming to IS 4984 - 1995 including
transportation to any where in AP , including Excise duty, sales tax etc., complete ( Supply upto
90mm dia in coil & above 90mm dia strightin length in 6M) (PE - 80 grade - 6 Kg/Sq Cm)

13.00

17

Rate worked out as per 2009-10 SSR


1 Rmt
Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment and gradiant to
hydraulic field test pressure per IS code including cost of water with minimum water lead of
500m (Labour charges only) Outer dia of pipes in mm.

104.30

18

13

14

15

1 Rmt

35.15

1 Job

700.00

1 Rmt

8.00

add contractors profit @ 14%


Total
19

Geologist investigation charges for bore well drilling etc,. Complete.


Rate as per GHMC Bore well rates

20

21

Supply and delivery of suitable flexible pipe to encase the submersible cable

Installation, Testing, Trail Run and Commissioning of Submersible Pumps set with all
accessories as per the standard specifications.
1 Job

1500.00

23

RBR-FNDN-1
Earthwork in excavation in all types of soils for pipeline trenches as per specification drawings
and as directed by the departmental officer and protecting the walls and other structures etc.,so
as not to disturb the existing utility services i.e water spply and sewer pipe lines ,telephone, and
power supply cables/ducts,strom water drains, traffic signals etc., during laying of Pipe lines
taking all precautionary measures in the restricted areas for laying sewer/watermains including
divertion of traffic and backfilling in trenches with excavated suitable material and and disposal
of remaining earth upto a lead of 50 m, including all incidental and operational charges etc.,
complete for Pipe Lines,

Rate as per Sewers data


24

41.95

Manufacture, supply, delivery of HDPE pipes conforming to IS 4984 - 1995 including


transportation to any where in AP , including Excise duty, sales tax etc., complete ( Supply upto
90mm dia in coil & above 90mm dia strightin length in 6M) (PE - 100 grade - 6 Kg/Sq Cm)
Rate as per 2009-10 SSr as per data sheet

25

1 Rmt

1 Rmt

104.30

Lowering, laying, jointing & testing of HDPE Pipe line laid to true alignment and gradiant to
hydraulic field test pressure per IS code including cost of water with minimum water lead of
500m (Labour charges only) Outer dia of pipes in mm.
Rate as per 2009-10 SSR as per Lowering sheet

1 Rmt

35.15

10

Unit

Amount

mations to the depth specified and reaming the


ucting yield test, inclusive of transportation from
bore wells should be true & vertical and work
979 and amendments if any from time to time,

O/08/2011-12, Dt.03.08.2010
1 Rmt

305.00

1 Rmt

335.50

ll materials, labour charges etc., complete for


1 Rmt

574.80

1 Each

6110.00

1 Each

6800.00

1 Each

10000.00

1 Rmt
1 Rmt
1 Rmt

53.00
66.00
88.00

1 Rmt

135.00

1 Rmt
1 Rmt
1 Rmt

300.00
365.00
440.00

1 Rmt
1 Rmt
1 Rmt

11.48
17.78
28.00

1 each
1 each
1 each

70.00
100.00
135.00

1 each
1 each

275.00
390.00

1 each
1 each
1 each

75.00
70.00
150.00

1 each
1 each

400.00
1250.00

1 each
1 each

40.00
72.00

1 each
1 each

350.00
650.00

1 each

150.00

1 each

800.00

1 each

1300.00

1 Rmt

13.00

1 Rmt

104.30

1 Rmt

35.15
4.92
40.07

Rs
1 Job

700.00

1 Rmt

8.00

1 Job

1500.00

1 Rmt

41.95

1 Rmt

104.30

1 Rmt

35.15

Page 2791 of 3205

Estimation for the construction of Manhole

1
Depth of the Man hole
Dia of the Man hole
Dia of the pipe

up to

0.90 Mts
0.90 Mts
200 mm

up to

Dia

Inner dia of Cylindrical portion


Wall thickness of cylendrical portion
Wall thickness of corbelling portion
Outer dia of Cylindrical portion
Earth work
Dia of CC bed
Outer dia of Corbelling portion at bottom
Inner dia of Corbelling portion at bottom
Outer dia of Corbelling portion at Top
Inner dia of Corbelling portion at Top

0.90
0.23
0.23
1.36
1.66
1.66
1.36
0.90
1.02
0.56

S.N Description of Item


a RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and
technical specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,

Measurements

x 0.952 x h
BLD-CSTN-3-7-Using Concrete mixture: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges
on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under
flooring bed.

3.14

0.6889

1.050

x 0.802 x h

3.14

0.6889

0.150

MH-est

Page 2792 of 3205


S.N Description of Item
c
BLD-CSTN-3-1: Brick Masonry in CM (1:3) with flyash Bricks of size 225 x 10 x 6 cms having minimum
Crushing strength 75 Kgs Per Sqm as per IS:12894-1990 - CLASS - 7.5 including Cost & conveyance
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all
materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing
charges etc., complete for finished item of work

For Cylindrical Portion


x (0.682 -0.452)x h
For Corbelling Portion
x( (0.682 -0.452)+ (0.512 -0.282) x h
BLD-CSTN-6-1: External plastering with Cement mortar ( 1:3) 12mm thick using OPCement including
cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational,
incidental, labour charges etc. complete
Outer walls
H2 Cylindrical Portion
2 x (0.68) x h
H1 Corbelling Portion
2 x (0.68+0.51)/2 x h

Measurements

3.14

0.26

0.30

1.57

0.44

0.60

6.28

0.68

0.30

6.28

0.60

0.60

6.28
6.28

0.45
0.45

0.30
-0.24

6.28
3.14
2

0.37
0.20
0.86

0.60

BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:1) 12mm thick using SR Cement including
cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational,
incidental, labour charges etc. complete
Inner walls
H2 Cylindrical Portion
2 x (0.45) x h
Deduction for benching portion
H1 Corbelling Portion
2 x (0.45+0.28) / 2 x h
for benching
for chanelling

MH-est

0.23

Page 2793 of 3205


S.N Description of Item
f
BLD-CSTN-3-11-Using Concrete mixture up to Plinth Level; Plain Cement concrete nominal mix M-20
prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed
Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item
of work .
for benching ; 4/3xh x SQRT(a2+2/5h2) x 2 Nos
for fixing of manhole frame

Measurements

2
3.14
3.14

0.23
0.18
0.07

Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in
A.P., F.O.R. destination including, loading, un-loading & stacking at site ,central excise duty but
excluding VAT and other taxes as applicable.
H.D.-20 with 500mm dia clear opening
Fixing charges of Manhole Frame (as per SSR.No.663 @Page -92) 2008- 09

1 No
1 No

For extra depth of each 0.10 Mts


1
2
3

Cost of Brick masonry for cylindrical portion of 0.10 Mts hieght


Cost of external plastering for cylindrical portion of 0.10 Mts hieght
Cost of internal plastering for cylindrical portion of 0.10 Mts hieght

0.080 Cum
0.430 Sqm
0.280 Sqm

Rate for Each 0.10 Mts extra Height

MH-est

0.2375
0.050
0.075

Page 2794 of 3205


S.N Description of Item
2

Measurements

Estimation for the construction of Manhole

Depth of the Man hole


Dia of the Man hole
Dia of the pipe

up to

1.65 Mts
1.20 Mts
200 mm

up to

Dia

Inner dia of Cylindrical portion


Wall thickness of cylendrical portion
Wall thickness of corbelling portion
Outer dia of Cylindrical portion
Earth work
Dia of CC bed
Outer dia of Corbelling portion at bottom
Inner dia of Corbelling portion at bottom
Outer dia of Corbelling portion at Top
Inner dia of Corbelling portion at Top

1.20
0.23
0.23
1.66
1.96
1.96
1.66
1.20
1.02
0.56

S.N Description of Item


a

Measurements

RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and
technical specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,

x 0.952 x h
BLD-CSTN-3-7-Using Concrete mixture: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges
on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under
flooring bed.

3.14

0.9604

1.800

x 0.802 x h

3.14

0.9604

0.15

MH-est

Page 2795 of 3205


S.N Description of Item
c
BLD-CSTN-3-1: Brick Masonry in CM (1:3) with flyash Bricks of size 225 x 10 x 6 cms having minimum
Crushing strength 75 Kgs Per Sqm as per IS:12894-1990 - CLASS - 7.5 including Cost & conveyance
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all
materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing
charges etc., complete for finished item of work

For Cylindrical Portion


x (0.682 -0.452)x h
For Corbelling Portion
x( (0.682 -0.452)+ (0.512 -0.282) x h
BLD-CSTN-6-1: External plastering with Cement mortar ( 1:3) 12mm thick using OPCement including
cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational,
incidental, labour charges etc. complete
Outer walls
H2 Cylindrical Portion
2 x (0.68) x h
H1 Corbelling Portion
2 x (0.68+0.51)/2 x h

MH-est

Measurements

3.14

0.33

0.30

1.57

0.51

1.35

6.28

0.83

0.30

6.28

0.67

1.35

Page 2796 of 3205


S.N Description of Item
e BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:1) 12mm thick using SR Cement including
cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational,
incidental, labour charges etc. complete
Inner walls
H2 Cylindrical Portion
2 x (0.45) x h
Deduction for benching portion
H1 Corbelling Portion
2 x (0.45+0.28) / 2 x h
for benching
for chanelling
f

6.28
6.28

0.60
0.60

0.30
-0.24

6.28
3.14
2

0.44
0.36
1.16

1.35

2
3.14
3.14

0.37
0.18
0.13

0.2375
0.050
0.075

Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in
A.P., F.O.R. destination including, loading, un-loading & stacking at site ,central excise duty but
excluding VAT and other taxes as applicable.
H.D.-20 with 560mm dia clear opening
Fixing charges of Manhole Frame (as per SSR.No.663 @Page -92) 2008- 09

1 No
1 No

For extra depth of each 0.10 Mts


1
2
3

0.23

BLD-CSTN-3-11-Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix M-20
prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed
Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item
of work .
for benching ; 4/3xh x SQRT(a2+2/5h2) x 2 Nos
for fixing of manhole frame

Measurements

Cost of Brick masonry for cylindrical portion of 0.10 Mts hieght


Cost of external plastering for cylindrical portion of 0.10 Mts hieght
Cost of internal plastering for cylindrical portion of 0.10 Mts hieght

0.100 Cum
0.520 Sqm
0.380 Sqm

Rate for Each 0.10 Mts extra Height

MH-est

Page 2797 of 3205


S.N Description of Item
3

Measurements

Estimation for the construction of Manhole

Depth of the Man hole


Dia of the Man hole
Dia of the pipe

up to

2.30 Mts
1.50 Mts
200 mm

Dia

Inner dia of Cylindrical portion


Wall thickness of cylendrical portion
Wall thickness of corbelling portion
Outer dia of Cylindrical portion
Earth work
Dia of CC bed
Outer dia of Corbelling portion at bottom
Inner dia of Corbelling portion at bottom
Outer dia of Corbelling portion at Top
Inner dia of Corbelling portion at Top

1.50
0.35
0.23
2.20
2.80
2.50
2.20
1.50
1.14
0.56

S.No Description of Item

Measurements

RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and
technical specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,

x 0.952 x h
BLD-CSTN-3-7-Using Concrete mixture: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges
on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under
flooring bed.

3.14

1.96

3.300

x 0.802 x h

3.14

1.5625

0.30

MH-est

Page 2798 of 3205


S.N Description of Item
c
BLD-CSTN-3-1: Brick Masonry in CM (1:3) with flyash Bricks of size 225 x 10 x 6 cms having minimum
Crushing strength 75 Kgs Per Sqm as per IS:12894-1990 - CLASS - 7.5 including Cost & conveyance
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all
materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing
charges etc., complete for finished item of work

For Cylindrical Portion


x (0.682 -0.452)x h
For Corbelling Portion
x( (0.682 -0.452)+ (0.512 -0.282) x h
BLD-CSTN-6-1: External plastering with Cement mortar ( 1:3) 12mm thick using OPCement including
cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational,
incidental, labour charges etc. complete
Outer walls
H2 Cylindrical Portion
2 x (0.68) x h
H1 Corbelling Portion
2 x (0.68+0.51)/2 x h

Measurements

3.14

0.65

1.05

1.57

0.89

1.95

6.28

1.10

1.05

6.28

0.84

1.95

6.28
6.28

0.75
0.75

1.05
-0.24

6.28
3.14
2

0.52
0.56
0.86

1.95

BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:1) 12mm thick using SR Cement including
cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational,
incidental, labour charges etc. complete
Inner walls
H2 Cylindrical Portion
2 x (0.45) x h
Deduction for benching portion
H1 Corbelling Portion
2 x (0.45+0.28) / 2 x h
for benching
for chanelling

MH-est

0.23

Page 2799 of 3205


S.N Description of Item
f
BLD-CSTN-3-11-Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix M-20
prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed
Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item
of work .
for benching ; 4/3xh x SQRT(a2+2/5h2) x 2 Nos
for fixing of manhole frame

Measurements

2
3.14
3.14

0.79
0.25
0.07

Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in
A.P., F.O.R. destination including, loading, un-loading & stacking at site ,central excise duty but
excluding VAT and other taxes as applicable.
H.D.-35 with 560mm dia clear opening
Fixing charges of Manhole Frame (as per SSR.No.663 @Page -92) 2008- 09

1 No
1 No

For extra depth of each 0.10 Mts


1
2
3

Cost of Brick masonry for cylindrical portion of 0.10 Mts hieght


Cost of external plastering for cylindrical portion of 0.10 Mts hieght
Cost of internal plastering for cylindrical portion of 0.10 Mts hieght

0.200 Cum
0.690 Sqm
0.470 Sqm

Rate for Each 0.10 Mts extra Height

MH-est

0.2375
0.050
0.075

Page 2800 of 3205


S.N Description of Item
2

Measurements

Estimation for the construction of Manhole

Depth of the Man hole


Dia of the Man hole
Dia of the pipe

up to

2.30 Mts
1.50 Mts
200 mm

Dia

Inner dia of Cylindrical portion


Wall thickness of cylendrical portion
Wall thickness of corbelling portion -H1
Wall thickness of corbelling portion -H2
Outer dia of Cylindrical portion
Earth work
Dia of CC bed
Outer dia of Corbelling portion - H1 at bottom
Inner dia of Corbelling portion - H1 at bottom
Outer dia of Corbelling portion - H1 at Top
Inner dia of Corbelling portion - H1 at Top
Outer dia of Corbelling portion - H2 at bottom
Inner dia of Corbelling portion - H2 at bottom
Outer dia of Corbelling portion - H2 at Top
Inner dia of Corbelling portion - H2 at Top

1.50
0.46
0.23
0.35
2.42
3.02
2.72
2.42
1.50
1.25
0.56
1.50
2.42
6.30
0.56

S.N Description of Item


a RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and
technical specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,

x 0.952 x h

Measurements

3.14

MH-est

2.2801

4.300

Page 2801 of 3205


S.N Description of Item
b BLD-CSTN-3-7-Using Concrete mixture: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine
aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and
conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges
on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top
surface to the required level curing etc., complete for finished item of work.for foundation and under
flooring bed.

Measurements

x 0.802 x h
BLD-CSTN-3-1: Brick Masonry in CM (1:3) with flyash Bricks of size 225 x 10 x 6 cms having minimum
Crushing strength 75 Kgs Per Sqm as per IS:12894-1990 - CLASS - 7.5 including Cost & conveyance
of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all
materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing
charges etc., complete for finished item of work

3.14

1.8496

0.30

For Cylindrical Portion


x (0.682 -0.452)x h
For Corbelling Portion
x( (0.682 -0.452)+ (0.512 -0.282) x h
BLD-CSTN-6-1: External plastering with Cement mortar ( 1:3) 12mm thick using OPCement including
cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational,
incidental, labour charges etc. complete

3.14

0.90

1.30

1.57

1.21

1.95

6.28

1.21

1.30

6.28

0.92

1.95

Outer walls
H2 Cylindrical Portion
2 x (0.68) x h
H1 Corbelling Portion
2 x (0.68+0.51)/2 x h

MH-est

Page 2802 of 3205


S.N Description of Item
e BLD-CSTN-6-1: Internal plastering with Cement mortar ( 1:1) 12mm thick using SR Cement including
cost and conveyance of all materials, all labour charges, scaffolding,Curing and all other operational,
incidental, labour charges etc. complete
Inner walls
H2 Cylindrical Portion
2 x (0.45) x h
Deduction for benching portion
H1 Corbelling Portion
2 x (0.45+0.28) / 2 x h
for benching
for chanelling
f

Measurements

6.28
6.28

0.75
0.75

1.30
-0.24

6.28
3.14
2

0.52
0.56
0.86

1.95

2
3.14
3.14

0.79
0.31
0.07

0.2375
0.050
0.075

BLD-CSTN-3-11-Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix M-20
prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed
Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item
of work .
for benching ; 4/3xh x SQRT(a2+2/5h2) x 2 Nos
for fixing of manhole frame

Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames anywhere in
A.P., F.O.R. destination including, loading, un-loading & stacking at site ,central excise duty but
excluding VAT and other taxes as applicable.

Fixing charges of Manhole Frame (as per SSR.No.663 @Page -92) 2008- 09
H.D.-35 with 560mm dia clear opening

1 No
1 No

For extra depth of each 0.10 Mts


1
2
3

0.23

Cost of Brick masonry for cylindrical portion of 0.10 Mts hieght


Cost of external plastering for cylindrical portion of 0.10 Mts hieght
Cost of internal plastering for cylindrical portion of 0.10 Mts hieght

0.280 Cum
0.760 Sqm
0.470 Sqm

Rate for Each 0.10 Mts extra Height


MH-est

Page 2803 of 3205


S.N Description of Item

Measurements

MH-est

Page 2804 of 3205


S.N Description of Item
3

Measurements

Estimation for the construction of Rectangular Inspection Chamber (600 x 600 mm)

Inner dimensions of Manhole


Wall thickness of the manhole
outer dimensions of Manhole
off set for CC (1:2:4) bed
off set for CC (1:5:10) bed
Earth work

0.60
0.150
0.90
0.05
0.05
1.20

S.N
Description of Item
1 RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and
technical specifications including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling
in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means,

Measurements

1.20

1.20

0.75

1.00

1.00

0.100

BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop
(Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal
including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm
layers, finishing top surface to the required level curing etc., complete for finished item of work.for
foundation and under flooring bed.

levelling course

MH-est

Page 2805 of 3205


S.N Description of Item
3 BLD-CSTN-5-17-(55) : Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150
x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5
kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges,
scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls.

for man hole long walls


for man hole Short walls
for benching -0.30m at wall side and 0.20m at channel side
4

1
1
1

x
x
x

2
2
2

0.90
0.60
0.60

2
1
1

x
x
x

2
2
2

0.90
0.60
0.60

1
1
1

x
x
x

2
2
1

0.60
0.60
0.60

0.15
0.15
0.15

0.60
0.60
0.25

BLD-CSTN-6-1: Plastering with Cement mortar ( 1:3) 12mm thick using OPCement including cost and
conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental,
labour charges etc. complete
for external plastering
for internal plastering

Measurements

0.60
0.60
0.30

BLD-CSTN-6-1: Plastering with Cement mortar ( 1:1) 12mm thick using SR Cement including cost and
conveyance of all materials, all labour charges, scaffolding,Curing and all other operational, incidental,
labour charges etc. complete
over benching
side walls of channel
channel flooring

MH-est

0.15
0.20
0.30

Page 2806 of 3205


S.N Description of Item
6 BLD-CSTN-3-11-Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix M-20
prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed
Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete ,
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item
of work .
for Manhole flooring
over brick walls Below manhole frame ((0.6+(2 x 0.075))
over brick wall for fixing the Manhole frame over long walls (sides)
over brick wall for fixing the Manhole frame over short walls( sides)
7

Measurements

1
1
1
1

x
x
x
x

1
4
2
2

Manufacture Supply & Delivery of manhole covers and frames anywhere in A.P., F.O.R. destination
including, loading, un-loading & stacking at site ,central excise duty but excluding VAT and other taxes
as applicable.
600mm x 600mm - LD-20 Manhole frame and cover

MH-est

0.95
0.75
0.90
0.80

0.95
0.15
0.05
0.05

0.05
0.05
0.12
0.12

Page 2807 of 3205

and

0.90 Mts to

1.65 Mts

Say

0.20 Mts

a
h
t

Benching

Radius

=
=
=

0.43
0.35
0.24

Depth

0.90 Mts
0.45
0.12
0.12
0.68
0.83
0.83
0.68
0.45
0.51
0.28
Qty

0.30 H2
0.60 H1
1.050
0.150

Rate

Per

Amount

2.273 Cum

#REF!

1 Cum

#REF!

0.325 Cum

#REF!

1 Cum

#REF!

MH-est

Page 2808 of 3205


Qty

Rate

Per

Amount

0.245 Cum

#REF!

1 Cum

#REF!

0.416 Cum

#REF!

1 Cum

#REF!

2.242
3.523 Sqm

#REF!

1 Sqm

#REF!

0.848
-0.671
0.177
1.375
0.640
0.387
2.579 Sqm

#REF!

1 Sqm

#REF!

1.281

MH-est

Page 2809 of 3205


Qty

Rate

0.109
0.029
0.017
0.155 Cum

1 No
1 No

@
@
@

Per

#REF!

2607.90
104.00
Total Rs

#REF!
#REF!
#REF!

Amount

1 Cum

1 No
1 No

1 Cum
1 Sqm
1 Sqm
Total Rs.
Say Rs.

#REF!

2608.00
104.00
#REF!

#REF!

#REF!
#REF!

MH-est

Page 2810 of 3205


Qty

Rate

Per

Amount

and

1.65 Mts to

2.30 Mts

Say

0.20 Mts

a
h
t

Radius

=
=
=

0.58
0.43
0.2375

Depth

1.65 Mts
0.60
0.12
0.12
0.83
0.98
0.98
0.83
0.60
0.51
0.28
Qty

0.30 H2
1.35 H1
1.800
0.150

Rate

Per

Amount

5.433 Cum

#REF!

1 Cum

#REF!

0.453 Cum

#REF!

1 Cum

#REF!

MH-est

Page 2811 of 3205


Qty

Rate

Per

Amount

0.310 Cum

#REF!

1 Cum

#REF!

1.082 Cum

#REF!

1 Cum

#REF!

#REF!

1 Sqm

#REF!

1.564
5.680
7.244 Sqm

MH-est

Page 2812 of 3205


Qty

Rate

Amount

1.130
-0.895
0.235
3.730
1.130
0.522
5.617 Sqm

#REF!

1 Sqm

#REF!

0.176
0.029
0.032
0.237 Cum

#REF!

1 Cum

#REF!

1 No
1 No

@
@
@

Per

2796.75
104.00
Total Rs

#REF!
#REF!
#REF!

1 No
1 No

1 Cum
1 Sqm
1 Sqm
Total Rs.
Say Rs.

2797.00
104.00
#REF!

#REF!

#REF!
#REF!

MH-est

Page 2813 of 3205


Qty

Rate

Per

Amount

and

2.50 Mts to

3.50 Mts

Say

0.20 Mts

a
h
t

Radius

=
=
=

0.43
0.855
0.2375

Depth

3.00 Mts
0.75
0.18
0.12
1.10
1.40
1.25
1.10
0.75
0.57
0.28
Qty

1.05 H2
1.95 H1
3.300
0.300

Rate

Per

Amount

20.328 Cum

#REF!

1 Cum

#REF!

1.473 Cum

#REF!

1 Cum

#REF!

MH-est

Page 2814 of 3205


Qty

Rate

Per

Amount

2.137 Cum

#REF!

1 Cum

#REF!

2.737 Cum

#REF!

1 Cum

#REF!

10.225
17.478 Sqm

#REF!

1 Sqm

#REF!

4.946
-1.119
3.827
6.307
1.770
0.387
12.291 Sqm

#REF!

1 Sqm

#REF!

7.253

MH-est

Page 2815 of 3205


Qty

Rate

0.375
0.039
0.017
0.431 Cum

1 No
1 No

@
@
@

Per

#REF!

2997.30
104.00
Total Rs

#REF!
#REF!
#REF!

Amount

1 Cum

1 No
1 No

1 Cum
10 Sqm
10 Sqm
Total Rs.
Say Rs.

#REF!

2997.00
104.00
#REF!

#REF!

#REF!
#REF!

MH-est

Page 2816 of 3205


Qty

Rate

Per

Amount

and

3.50 Mts to

4.50 Mts

Say

0.20 Mts

a
h
t

Radius

=
=
=

0.43
0.855
0.2375

Depth

4.00 Mts
0.75
0.23
0.12
0.18
1.21
1.51
1.36
1.21
0.75
0.63
0.28
0.75
1.21
3.15
0.28
Qty

1.30 H3
1.95 H1
0.75 H2
3.550
0.300

Rate

30.814 Cum

Per

#REF!

Amount

1 Cum

#REF!

MH-est

Page 2817 of 3205


Qty

Rate

Per

Amount

1.744 Cum

#REF!

1 Cum

#REF!

3.684 Cum

#REF!

1 Cum

#REF!

3.716 Cum

#REF!

1 Cum

#REF!

#REF!

1 Sqm

#REF!

9.878
11.236
21.114 Sqm

MH-est

Page 2818 of 3205


Qty

@
@
@

Rate

Per

Amount

6.123
-1.119
5.004
6.307
1.770
0.387
13.468 Sqm

#REF!

1 Sqm

#REF!

0.375
0.049
0.017
0.441 Cum

#REF!

1 Cum

#REF!

1 No

2997.30

1 No

2997.00

1 No

104.00
Total Rs

1 No

104.00
#REF!

#REF!
#REF!
#REF!

1 Cum
10 Sqm
10 Sqm
Total Rs.
Say Rs.

#REF!

#REF!
#REF!
MH-est

Page 2819 of 3205


Qty

Rate

Per

Amount

MH-est

Page 2820 of 3205


Qty

Rate

Per

Amount

0 x 600 mm)
0.60
0.150
0.90
0.05
0.05
1.20
Qty

0.60 H
0.05
0.100
0.750
Rate

Per

Amount

1.080 Cum

#REF!

1 Cum

#REF!

0.100 Cum

#REF!

1 Cum

#REF!

MH-est

Page 2821 of 3205


Qty

Rate

Per

Amount

0.160
0.110
0.050
0.320 Cum

4596.35

1 Cum

1471.00

2.160
0.720
0.360
3.240 Sqm

#REF!

1 Sqm

#REF!

0.180
0.240
0.180
0.600 Sqm

#REF!

1 Sqm

#REF!

MH-est

Page 2822 of 3205


Qty

Rate

0.050
0.020
0.011
0.010
0.091 Cum

Per

#REF!

Amount

1 Cum

#REF!

1 No

500.00
#REF!

Market rate
1 No

500.00
Total Rs

MH-est

Page 2825 of 3205


Kandukur Municipality
DATA BASED ON - 2015 - 2016 SSR
20/02/16
Man Hole data
1

RBR-FNDN-1: Earthwork excavation in all types of soils as per specification drawings and as directed by the
including protecting the existing structures and utility services like water spply and sewer pipe lines ,telepho
cables/ducts,strom water drains, traffic signals etc., during the execution, taking all precautionary measures in
including divertion of traffic and back filling in trenches with excavated suitable material including all incidental an
etc., complete. for Sumps,Thrust blocks, Chambers and Man Holes etc. etc,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H

Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
By Manual means
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate
0 Nos.
Mazdoor (Unskilled)
3.64 Nos.
Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Rate per 1 Cum excluding Dewatering
By Mechanical means
up to 3.00 Mts depth below GL
a)Labour
Mate
Mazdoor (Unskilled)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity

out put

240.00
0 Nos.
8.32 Nos.
6 hours

Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering

data-MH (2)

Cum
450.00
384.00

Cum
450.00
384.00
2791.00

Page 2826 of 3205


2

BLD-CSTN-3-7-Using Concrete mixture: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggreg
) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like
aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concret
layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and

Unit : 1cum
A. MATERIALS:
Cement
Coarse aggregate 40mm graded
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total
Overheads & Contractors Profit
Grand Total

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl

5.74
1311.81
791.93
103.00

1 hour

338.60

0.10 Nos
1.39 Nos

504.00
384.00

Rate per cu.m.


3

BLD-CSTN-3-11-Using Concrete mixture up to Plinth Level ; Plain Cement concrete nominal mix M-20 prop (Ce
coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyan
cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mix
ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work .
Unit : 1cum
A. MATERIALS:
Cement
Coarse aggregate 20mm graded
Fine aggregate (Sand)
Water (including for curing)
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity
C. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total
Overheads & Contractors Profit
Grand Total
Rate per cu.m.

data-MH (2)

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

5.74
1684.81
791.93
103.00

1 hour

338.60

0.10 Nos
1.39 Nos

504.00
384.00

Page 2827 of 3205


4

BLD-CSTN-3-1: Brick Masonry in CM (1:3) with flyash Bricks of size 22.5 x 10 x 6 cms having minimum Crushin
Sqm as per IS:12894-1990 - CLASS - 7.5 including Cost & conveyance of all Materials like Cement, Sand, Bric
cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding
curing charges etc., complete for finished item of work
A. MATERIALS:
Fly ash cement/lime solid blocks- 225 x 100 x 60
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm

Nos.
Kg
Cum

0.24 Nos.
0.56 Nos.
1.89 Nos.

7000.00
5.74
791.93
504.00
450.00
384.00

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveya
site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour c
cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm

671.00
96.00
0.20

0.15 Cum

3733.88

0.60 Nos
0.96 Nos

504.00
384.00

BLD-CSTN-6-4: Plastering with 12mm thick in single coat in CM (1:1) finished smooth including cost and conveya
site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour c
cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:1)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
Grand Total
Rate per 10 Sqm

data-MH (2)

0.15 Cum

9244.28

0.60 Nos
0.96 Nos

504.00
384.00

Page 2828 of 3205

and as directed by the departmental officer


wer pipe lines ,telephone,and power supply
autionary measures in the restricted areas
cluding all incidental and operational charges

01.2.1 of MORT&H

1 Each
1 Each

Rs

0.00
1397.76
1397.76
195.69
1593.45
159.35
159.35

1 Each
1 Each

0.00
3194.88

1 hours

16746.00

Rs

19940.88
2791.72
22732.60
94.72
94.75

data-MH (2)

Page 2829 of 3205

p (Cement : fine aggregate: coarse aggregate


e of all materials like cement, sand, coarse
mixing , laying, concrete , ramming in 15 cm
rk.for foundation and under flooring bed.

1 Kg
1 Cum
1 Cum
1 Kl

743.90
1180.63
356.37
123.60

1 hour

338.60

1 Nos
1 Nos

50.40
533.76
3327.26
465.82
3793.08
3793.10

Rs

Rs

minal mix M-20 prop (Cement : fine aggregate:


ding cost and conveyance of all materials like
abour charges , for mixing , laying, concrete ,
inished item of work .

1 Kg
1 Cum
1 Cum
1 Kl

1894.20
1516.33
356.37
123.60

1 hour

338.60

1 Nos
1 Nos

50.40
533.76
4813.26
673.86
5487.12
5487.15

Rs

Rs

data-MH (2)

Page 2830 of 3205

aving minimum Crushing strength 75 Kgs Per


ike Cement, Sand, Bricks, Water, etc., to site
ment Mortor, scaffoding charges lift charges ,

1000 Nos.
1 Kg
1 Cum

4697.00
551.04
158.39

1 Each
1 Each
1 Each

120.96
252.00
725.76
6505.15
910.72
7415.87
7415.90

Rs

uding cost and conveyance of all materials to


nal, incidental, labour charges etc., including
03). per 10 Sqm.

1 Cum

560.08

1 Nos
1 Nos

302.40
368.64
1231.12
172.36
1403.48
1403.50

Rs

uding cost and conveyance of all materials to


nal, incidental, labour charges etc., including
03). per 10 Sqm.

1 Cum

1386.64

1 Nos
1 Nos

302.40
368.64
2057.68
288.08
2345.76
2345.80

Rs

data-MH (2)

Page 2831 of 3205

Manufacture,supply and delivery of RCC Plain Ended Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate per Meter of effective leng
Sales Tax but Excluding VAT etc.complete.
Cost of RCC Plain Ended NP2 & NP3 Pipes & Conveyance Charges - 2014-15
Cement Rate as per

Market
11/1/2015
SSR
Variation per Kg

MS rods Rate as per

Market
11/1/2015
SSR
Variation per Kg

36000.00
41000.00
-5.000

RCC NP2 PE Pipes: per RMT

Basic Rate of
Cement
Variation in
Dia of Pipes Pipe per
S N0
required per Cement
in mm
Rmt
1 Rmt
Cost
( Table-1)
P1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

5740.00
4000.00
1.74

100mm
150mm
200mm
225mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm

169.00
201.00
239.00
260.00
277.00
397.00
495.00
571.00
699.00
767.00
1135.00
1453.00
1788.00
2251.00
2738.00
3246.00
3867.00

Wc
3.60
3.60
7.20
7.20
7.20
10.80
14.40
14.40
18.00
21.60
32.40
43.20
50.40
68.00
80.00
96.00
112.00

R1
6.26
6.26
12.53
12.53
12.53
18.79
25.06
25.06
31.32
37.58
56.38
75.17
87.70
118.32
139.20
167.04
194.88

MS rods
required
per 1 Rmt

Ws
0.77
0.83
0.97
1.05
1.17
1.57
1.91
2.27
2.75
3.24
4.25
5.82
7.93
10.47
12.45
14.50
17.23

Rate for
Rate up to
Variation Actual Rate
every
5 Kms Lead
in MS
of Pipe per
additional 1
rods Cost
Rmt
KM lead or
(Table-6)
part thereof
R2
-3.85
-4.15
-4.85
-5.25
-5.85
-7.85
-9.55
-11.35
-13.75
-16.20
-21.25
-29.10
-39.65
-52.35
-62.25
-72.50
-86.15

Total lead
charges

R1+R2
171.41
203.11
246.68
267.28
283.68
407.94
510.51
584.71
716.57
788.38
1170.13
1499.07
1836.05
2316.97
2814.95
3340.54
3975.73

data-RCC-PE & SS. 337269598.xlsx

4.20
6.30
8.40
9.45
10.50
14.70
21.00
23.10
30.45
32.55
47.25
59.85
70.35
80.85
119.70
131.25
149.10

0.14
0.27
0.27
0.42
0.42
0.56
1.26
1.40
1.68
1.95
3.08
4.34
4.34
4.34
8.94
8.94
9.50

4.90
7.65
9.75
11.55
12.60
17.50
27.30
30.10
38.85
42.30
62.65
81.55
92.05
102.55
164.40
175.95
196.60

Add over
heads on
pipe

CED @

13.62%

12.50%

23.34
27.65
33.59
36.39
38.62
55.54
69.51
79.61
97.56
107.34
159.31
204.10
249.98
315.46
383.26
454.81
541.30

21.43
25.39
30.84
33.41
35.46
50.99
63.81
73.09
89.57
98.55
146.27
187.38
229.51
289.62
351.87
417.57
496.97

Page 2832 of 3205

18

1400mm

19
20

1600mm
1800mm

5270.00
6104.00
8005.00

140.00

243.60

23.21

-116.05

5397.55

179.55

9.50

168.00
216.00

292.32
375.84

28.92
36.26

-144.60
-181.30

6251.72
8199.54

207.90
239.40

9.50
9.50

data-RCC-PE & SS. 337269598.xlsx

227.05
255.40
286.90

734.88

674.69

851.17
1116.37

781.47
1024.94

Page 2833 of 3205

2 RCC NP3 PE Pipes: per RMT

SN

Basic Rate of
Cement
Variation in
Dia of Pipes Pipe per
required per Cement
in mm
Rmt
1 Rmt
Cost
( Table-1)

1
2
3

300mm
350mm
400mm

P1
906.00
1117.00
1233.00

Wc
14.40
25.20
32.40

R1
25.06
43.85
56.38

450mm

1412.00

39.60

500mm

1535.00

600mm

MS rods
required
per 1 Rmt

Ws

Rate for
Rate up to
Variation Actual Rate
every
5 Kms Lead
in MS
of Pipe per
additional 1
rods Cost
Rmt
KM lead or
(Table-6)
part thereof

Total lead
charges

2.58
3.73
4.08

R2
-12.90
-18.65
-20.40

R1+R2
918.16
1142.20
1268.98

40.95
44.10
52.50

1.12
1.26
1.68

46.55
50.40

68.90

4.57

-22.85

1458.05

56.70

46.80

81.43

5.60

-28.00

1588.43

2309.00

57.60

100.22

8.19

-40.95

700mm

2870.00

75.60

131.54

11.45

10

800mm

3792.00

97.20

169.13

11

900mm

4764.00

124.00

12

1000mm

5917.00

13

1100mm

14

Add over
heads on
pipe cost

CED @

60.90

13.62%
125.01
155.51
172.77

12.50%
114.77
142.78
158.62

1.95

66.45

198.51

182.26

61.95

1.95

71.70

216.26

198.55

2368.27

93.45

4.34

115.15

322.44

296.03

-57.25

2944.29

103.95

5.04

129.15

400.87

368.04

15.70

-78.50

3882.63

124.95

5.04

150.15

528.62

485.33

215.76

20.96

-104.80

4874.96

163.80

9.50

211.30

663.73

609.37

160.00

278.40

24.18

-120.90

6074.50

197.40

9.50

244.90

827.04

759.31

6982.00

184.00

320.16

30.25

-151.25

7150.91

214.20

10.34

265.90

973.60

893.86

1200mm

8225.00

208.00

361.92

37.12

-185.60

8401.32

239.40

10.34

291.10

1143.84

1050.17

15

1400mm

10626.00

272.00

473.28

49.76

-248.80

10850.48

325.50

10.76

379.30

1477.29

1356.31

16

1600mm

13794.00

364.00

633.36

68.95

-344.75

14082.61

390.60

10.76

444.40

1917.35

1760.33

17

1800mm

18293.00

448.00

779.52

96.46

-482.30

18590.22

520.80

15.10

596.30

2531.06

2323.78

data-RCC-PE & SS. 337269598.xlsx

Page 2834 of 3205

3
Manufacture,supply and delivery of RCC Collars confirming to B.I.S. 458/ 2003 (RATE PER EACH COLLAR ) suitable for RCC Plain Ended
Pipes including Transportation,Central Excice Duty, Sales Tax but Excluding VAT etc.complete.
Collars

SN

Dia of Pipes
in mm

for

100mm
150mm
200mm
225mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1400mm
1600mm
1800mm

Pipes

11/1/2015

Basic Rate
Cement
Variation in MS rods
Variation
Actual Rate
per each required per Cement
required
in MS
per each
(table -2)
each
Cost
per 1 each rods Cost

P1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

NP2

46.00
48.00
65.00
68.00
75.00
99.00
122.00
135.00
212.00
241.00
327.00
425.00
600.00
717.00
837.00
1025.00
1246.00
1607.00
2052.00
2125.00

Wc

R1
0.72
0.72
0.72
0.72
0.72
1.08
1.08
1.08
1.80
1.80
2.16
2.16
2.52
3.20
3.60
4.00
4.40
5.20
5.60
6.80

0.001
0.001
0.001
0.001
0.001
0.002
0.002
0.002
0.003
0.003
0.004
0.004
0.004
0.006
0.006
0.007
0.008
0.009
0.010
0.012

Ws

R2
0.15
0.16
0.18
0.20
0.22
0.24
0.33
0.36
0.38
0.55
0.75
1.28
2.08
2.28
2.58
3.72
4.44
5.58
7.22
9.67

-0.001
-0.001
-0.001
-0.001
-0.001
-0.001
-0.002
-0.002
-0.002
-0.003
-0.004
-0.006
-0.010
-0.011
-0.013
-0.019
-0.022
-0.028
-0.036
-0.048

R1+R2
46.00
48.00
65.00
68.00
75.00
99.00
122.00
135.00
212.00
241.00
327.00
425.00
599.99
717.00
836.99
1024.99
1245.99
1606.98
2051.97
2124.96

data-RCC-PE & SS. 337269598.xlsx

Add over
heads on
Collar

CED @

Add ST @

13.62%

12.50%

5.00%

6.26
6.54
8.85
9.26
10.21
13.48
16.61
18.38
28.86
32.81
44.52
57.86
81.69
97.62
113.96
139.55
169.64
218.79
279.38
289.31

5.75
6.00
8.13
8.50
9.38
12.38
15.25
16.88
26.50
30.13
40.88
53.13
75.00
89.63
104.62
128.12
155.75
200.87
256.50
265.62

2.30
2.40
3.25
3.40
3.75
4.95
6.10
6.75
10.60
12.05
16.35
21.25
30.00
35.85
41.85
51.25
62.30
80.35
102.60
106.25

Rate
excluding
Over heads

54.05
56.40
76.38
79.90
88.13
116.33
143.35
158.63
249.10
283.18
384.23
499.38
704.99
842.48
983.46
1204.36
1464.04
1888.20
2411.07
2496.83

Rate
including
Over heads

60.30
62.90
85.20
89.20
98.30
129.80
160.00
177.00
278.00
316.00
428.80
557.20
786.70
940.10
1097.40
1343.90
1633.70
2107.00
2690.40
2786.10

Page 2835 of 3205

data-RCC-PE & SS. 337269598.xlsx

Page 2836 of 3205

Manufacture,supply and delivery of RCC Collars confirming to B.I.S. 458/ 2003 (RATE PER EACH COLLAR ) suitable for RCC Plain Ended
Pipes including Transportation,Central Excice Duty, Sales Tax but Excluding VAT etc.complete. ( for NP 3 pipes )
Collars

SN

Dia of Pipes
in mm

for

NP3

Pipes

11/1/2015

Basic Rate
Cement
Variation in MS rods
Variation
Actual Rate
per each required per Cement
required
in MS
per each
( table -2 )
each
Cost
per 1 each rods Cost

300mm

P1
142.00

350mm

Wc

R1

Ws

R2

Add over
heads on
Collar

CED @

Add ST @

Rate
excluding
Over heads

Rate
including
Over heads

1.08

1.88

0.33

-1.65

R1+R2
142.23

176.00

1.08

1.88

0.36

-1.80

176.08

23.97

22.01

8.80

206.89

230.90

400mm

201.00

1.80

3.13

0.38

-1.90

202.23

27.53

25.28

10.11

237.62

265.20

450mm

267.00

1.80

3.13

0.55

-2.75

267.38

36.40

33.42

13.37

314.17

350.60

10

500mm

318.00

2.16

3.76

0.75

-3.75

318.01

43.30

39.75

15.90

373.66

417.00

11

600mm

417.00

2.16

3.76

1.28

-6.40

414.36

56.42

51.80

20.72

486.88

543.30

12

700mm

561.00

2.52

4.39

2.08

-10.40

554.99

75.56

69.37

27.75

652.11

727.70

13

800mm

714.00

3.20

5.57

2.28

-11.40

708.17

96.42

88.52

35.41

832.10

928.50

14

900mm

832.00

3.60

6.26

2.58

-12.90

825.36

112.37

103.17

41.27

969.80

1082.20

15

1000mm

1040.00

4.00

6.96

3.72

-18.60

1028.36

140.01

128.55

51.42

1208.33

1348.30

16

1100mm

1317.00

4.40

7.66

4.44

-22.20

1302.46

177.33

162.81

65.12

1530.39

1707.70

17

1200mm

1649.00

5.20

9.05

5.58

-27.90

1630.15

221.94

203.77

81.51

1915.43

2137.40

18

1400mm

2088.00

5.60

9.74

7.22

-36.10

2061.64

280.69

257.71

103.08

2422.43

2703.10

19

1600mm

2677.00

6.80

11.83

9.67

-48.35

2640.48

359.50

330.06

132.02

3102.56

3462.10

20

1800mm

3450.00

7.60

13.22

13.15

-65.75

3397.47

462.57

424.68

169.87

3992.02

4454.60

data-RCC-PE & SS. 337269598.xlsx

13.62%
19.36

12.50%
17.78

5.00%
7.11

167.12

186.50

Page 2837 of 3205

360 up to 800
400 above 800

2*
6.286
NP 2 Class PE Pipes
Barral
Dia of Pipe
Thickness in
in Mts
Mts

S.N

Radius of
Pipe

Collars for NP 2 Class PE Pipes

Volume
Steel Qty
Cement Qty
per 1
in Kgsin Kg
Rmt
NP2

Dia of pipe
in Mts

Dia of
Collar in
Mts

Length in
Mts

Barral
Thickness in
Mts

Radius of
Collar

0.10

0.025

0.06

0.01

3.60

0.77

0.10

0.13

0.15

0.025

0.09

0.15

0.025

0.09

0.01

3.60

0.83

0.15

0.18

0.15

0.025

0.09

0.20

0.025

0.11

0.02

7.20

0.97

0.20

0.23

0.15

0.025

0.09

0.225

0.025

0.13

0.02

7.20

1.05

0.225

0.25

0.15

0.025

0.09

0.25

0.025

0.14

0.02

7.20

1.17

0.25

0.28

0.15

0.025

0.09

0.30

0.03

0.17

0.03

10.80

1.57

0.30

0.33

0.15

0.03

0.09

0.35

0.032

0.19

0.04

14.40

1.91

0.35

0.38

0.15

0.032

0.09

0.40

0.032

0.22

0.04

14.40

2.27

0.40

0.43

0.15

0.032

0.09

0.45

0.035

0.24

0.05

18.00

2.75

0.45

0.488

0.20

0.035

0.12

10

0.50

0.035

0.27

0.06

21.60

3.24

0.50

0.538

0.20

0.035

0.12

11

0.60

0.045

0.32

0.09

32.40

4.25

0.60

0.638

0.20

0.04

0.12

12

0.70

0.05

0.38

0.12

43.20

5.82

0.70

0.738

0.20

0.04

0.12

13

0.80

0.05

0.43

0.14

50.40

7.93

0.80

0.838

0.20

0.045

0.12

14

0.90

0.055

0.48

0.17

68.00

10.47

0.90

0.938

0.20

0.05

0.13

15

1.00

0.06

0.53

0.2

80.00

12.45

1.00

1.038

0.20

0.055

0.13

16

1.10

0.065

0.58

0.24

96.00

14.50

1.10

1.138

0.20

0.06

0.13

17

1.20

0.07

0.64

0.28

112.00

17.23

1.20

1.238

0.20

0.065

0.13

18

1.40

0.075

0.74

0.35

140.00

23.21

1.40

1.438

0.20

0.075

0.14

19

1.60

0.08

0.84

0.42

168.00

28.92

1.60

1.638

0.20

0.08

0.14

20

1.80

0.09

0.95

0.54

216.00

36.26

1.80

1.838

0.20

0.09

0.15

21

2.00

0.10

1.05

0.66

264.00

50.42

2.00

2.038

0.20

0.10

0.15

22

2.20

0.11

1.16

0.80

320.00

61.65

2.20

2.238

0.20

0.11

0.16

Vide Page No.7 of IS 458.2003

IS 458 -2003 Pg.28

data-RCC-PE & SS. 337269598.xlsx

Page 2838 of 3205

2*

360 up to 800

6.286

400 above 800

NP 3 Class Pipes
Barral
Dia of Pipe
Thickness in
in Mts
Mts

S.N

Radius of
Pipe

Collars for NP 3 Class PE Pipes

Volume
Steel Qty
Cement Qty
per 1
in Kgsin Kg
Rmt
NP3

Dia of Pipe
in Mts

Dia of
Collar in
Mts

Length in
Mts

Barral
Thickness in
Mts

Radius of
Collar

0.30

0.04

0.17

0.04

14.40

2.58

0.30

0.33

0.15

0.03

0.09

0.35

0.055

0.20

0.07

25.20

3.73

0.35

0.39

0.15

0.035

0.09

0.40

0.06

0.23

0.09

32.40

4.08

0.40

0.44

0.20

0.035

0.12

0.45

0.065

0.26

0.11

39.60

4.57

0.45

0.49

0.20

0.035

0.12

0.50

0.07

0.29

0.13

46.80

5.60

0.50

0.54

0.20

0.04

0.12

0.60

0.075

0.34

0.16

57.60

8.19

0.60

0.64

0.20

0.04

0.12

0.70

0.085

0.39

0.21

75.60

11.45

0.70

0.74

0.20

0.045

0.12

0.80

0.095

0.45

0.27

97.20

15.70

0.80

0.84

0.20

0.05

0.13

0.90

0.10

0.50

0.31

124.00

20.96

0.90

0.94

0.20

0.055

0.13

10

1.00

0.115

0.56

0.4

160.00

24.18

1.00

1.04

0.20

0.06

0.13

11

1.10

0.12

0.61

0.46

184.00

30.25

1.10

1.14

0.20

0.065

0.13

12

1.20

0.125

0.66

0.52

208.00

37.12

1.20

1.24

0.20

0.075

0.14

13

1.40

0.14

0.77

0.68

272.00

49.76

1.40

1.44

0.20

0.08

0.14

14

1.60

0.165

0.88

0.91

364.00

68.95

1.60

1.64

0.20

0.09

0.15

15

1.80

0.18

0.99

1.12

448.00

96.46

1.80

1.84

0.20

0.10

0.15

16

2.00

0.19

1.1

1.31

524.00

107.26

2.00

2.04

0.20

0.11

0.16

17

2.20

0.21

1.21

1.6

640.00

142.66

18

2.40

0.225

1.31

1.85

740.00

190.64

Vide Page No.8 of IS 458.2003

Vide Page No.8 of IS 458.1988 - Note.2

data-RCC-PE & SS. 337269598.xlsx

Page 2839 of 3205

Manufacture,supply and delivery of RCC Socket and Spigot Pipes confirming to B.I.S. 458/2003 ex-Factory, ( Rate per Meter of effective length) includi
Excluding VAT etc.complete.
Cost of RCC S/S NP2 & NP3 Pipes & Conveyance Charges - 2014-15
Cement Rate as per

Market
SSR
Variation

11/1/2015

5740.00
4000.00
1.74

MS rods Rate as per

Market
SSR
Variation

11/1/2015

36000.00
41000.00
-5.00

RCC NP2 S/S Pipes: per RMT

SN

Basic Rate of
Cement
Variation in
Dia of Pipes Pipe per
required per Cement
in mm
Rmt
1 Rmt
Cost
( Table-3)

P1

Wc

R1

MS rods
required
per 1 Rmt

Ws

Rate for
Rate up to
Variation Actual Rate
every
5 Kms Lead
in MS
of Pipe per
additional 1
rods Cost
Rmt
KM lead or
(Table-6)
part thereof
R2

Total lead
charges

R1+R2

Add over
heads on
pipe cost

CED @

13.62%

12.50%

100mm

206.00

3.60

6.26

0.86

-4.30

207.96

4.20

0.25

5.45

29.06

26

150mm

240.00

3.60

6.26

0.95

-4.75

241.51

7.35

0.25

8.60

34.05

30.19

200mm

293.00

7.20

12.53

1.11

-5.55

299.98

9.45

0.50

11.95

42.47

37.5

250mm

319.00

7.20

12.53

1.33

-6.65

324.88

11.55

0.50

14.05

46.15

40.61

300mm

341.00

10.80

18.79

2.02

-10.10

349.69

18.90

1.14

24.60

50.96

43.71

350mm

479.00

14.40

25.06

2.42

-12.10

491.96

22.05

1.27

28.40

70.85

61.5

400mm

615.00

14.40

25.06

2.83

-14.15

625.91

22.05

1.40

29.05

89.17

78.24

450mm

679.00

18.00

31.32

3.38

-16.90

693.42

31.50

1.65

39.75

99.82

86.68

500mm

845.00

21.60

37.58

3.92

-19.60

862.98

34.65

1.77

43.50

123.42

107.87

10

600mm

974.00

32.40

56.38

5.06

-25.30

1005.08

45.15

1.91

54.70

144.29

125.64

11

700mm

1370.00

43.20

75.17

6.74

-33.70

1411.47

55.65

3.31

72.20

202.00

176.43

12

800mm

1777.00

50.40

87.70

9.07

-45.35

1819.35

76.65

3.56

94.45

260.56

227.42

13

900mm

2279.00

61.20

106.49

11.97

-59.85

2325.64

114.45

5.46

141.75

335.94

290.71

14

1000mm

2880.00

72.00

125.28

14.36

-71.80

2933.48

130.20

9.79

179.15

423.78

366.69

15

1100mm

3498.00

86.40

150.34

16.84

-84.20

3564.14

147.00

9.79

195.95

511.94

445.52

data-RCC-PE & SS. 337269598.xlsx

Page 2840 of 3205

16

1200mm

4102.00

100.80

175.39

20.03

-100.15

4177.24

163.80

10.04

214.00

597.87

522.16

17

1400mm

4649.00

126.00

219.24

27.03

-135.15

4733.09

203.70

10.04

253.90

678.98

591.64

18

1600mm

6619.00

151.20

263.09

34.56

-172.80

6709.29

241.50

10.04

291.70

953.18

838.66

19

1800mm

8187.00

194.40

338.26

43.51

-217.55

8307.71

299.25

10.29

350.70

1178.84

1038.46

data-RCC-PE & SS. 337269598.xlsx

Page 2841 of 3205

RCC NP3 S/S Pipes: per RMT


Rate for
Cement
MS rods
Variation in Actual Rate
every
Dia of Pipes in Basic Rate of
Variation in
Rate up to 5
S. No.
required per
required per MS rods
of Pipe per
additional 1
mm
Pipe per Rmt
Cement Cost
Kms Lead
1 Rmt
1 Rmt
Cost
Rmt
KM lead or
part thereof
P1

Wc

R1

Ws

R2

Total lead
charges

R1+R2

Add over
heads

CED @

14%

12.50%

300mm

1154.00

14.40

25.06

3.03

-15.15

1163.91

49.68

1.52

57.28

166.27

145.49

350mm

1471.00

36.00

62.64

4.37

-21.85

1511.79

54.00

1.77

62.85

214.39

188.97

400mm

1630.00

39.60

68.90

4.79

-23.95

1674.95

66.96

3.31

83.51

239.41

209.37

450mm

1799.00

43.20

75.17

5.33

-26.65

1847.52

73.44

3.31

89.99

263.79

230.94

500mm

2057.00

50.40

87.70

6.47

-32.35

2112.35

81.00

3.56

98.80

301.05

264.04

600mm

2885.00

64.80

112.75

9.19

-45.95

2951.80

109.08

5.08

134.48

420.20

368.98

700mm

3683.00

75.60

131.54

13.61

-68.05

3746.49

146.88

10.04

197.08

536.92

468.31

10

800mm

4875.00

97.20

169.13

18.57

-92.85

4951.28

173.88

10.04

224.08

704.63

618.91

11

900mm

6128.00

124.00

215.76

25.02

-125.10

6218.66

200.88

10.04

251.08

880.86

777.33

12

1000mm

6927.00

160.00

278.40

24.18

-120.90

7084.50

211.68

10.04

261.88

1000.21

885.56

13

1100mm

8176.00

176.00

306.24

30.65

-153.25

8328.99

226.80

10.04

277.00

-1385.00

1041.12

14

1200mm

9649.00

200.00

348.00

37.12

-185.60

9811.40

253.80

10.29

305.25

1377.38

1226.43

15

1400mm

12778.00

260.00

452.40

49.76

-248.80

12981.60

340.20

10.29

391.65

1820.77

1622.7

16

1600mm

16592.00

308.00

535.92

68.95

-344.75

16783.17

401.76

11.06

457.06

2347.26

2097.9

17

1800mm

21999.00

368.00

640.32

96.46

-482.30

22157.02

535.68

15.12

611.28

3099.90

2769.63

data-RCC-PE & SS. 337269598.xlsx

Page 2842 of 3205

RUBBER RINGS

Manufacture,supply and delivery of Rubber rings to suit RCC Socket and Spigot Pipes confirming to B.I.S. 5382/ 1985 (RATE PER EACH RUBBER RING) including Transportation

Rubber Rings for RCC NP2 Pipes

Sl.No. Dia of Pipes Basic Rate

Add CED @

Add ST @

Add CP
& OH

12.50%

5.00%

13.62%

Rubber R
Add VAT &
LC @

Rate
excluding
Over heads

Dia of Pipes

Basic Rate

0.00%

Add CED @

12.50%

80mm

29.00

3.63

1.45

3.95

34.08

100mm

35.00

4.38

1.75

4.77

41.13

150mm

63.00

7.88

3.15

8.58

74.03

200mm

74.00

9.25

3.70

10.08

86.95

19

225mm

81.00

10.13

4.05

11.03

95.18

250mm

91.00

11.38

4.55

12.39

106.93

300mm

111.00

13.88

5.55

15.11

130.43

300mm

143.00

17.88

350mm

129.00

16.13

6.45

17.56

151.58

350mm

171.00

21.38

400mm

142.00

17.75

7.10

19.33

166.85

400mm

194.00

24.25

450mm

161.00

20.13

8.05

21.92

189.18

450mm

220.00

27.50

10

500mm

210.00

26.25

10.50

28.59

246.75

500mm

252.00

31.50

11

600mm

276.00

34.50

13.80

37.58

324.30

600mm

366.00

45.75

12

700mm

375.00

46.88

18.75

51.06

440.63

700mm

438.00

54.75

13

800mm

476.00

59.50

23.80

64.81

559.30

800mm

531.00

66.38

14

900mm

596.00

74.50

29.80

81.15

700.30

900mm

718.00

89.75

13

1000mm

697.00

87.13

34.85

94.90

818.98

1000mm

867.00

108.38

14

1100mm

838.00

104.75

41.90

114.09

984.65

1100mm

1110.00

138.75

15

1200mm

1342.00

167.75

67.10

182.71

1576.85

1200mm

1395.00

174.38

16

1400mm

1476.00

184.50

73.80

200.96

1734.30

1400mm

1535.00

191.88

17

1600mm

1838.00

229.75

91.90

250.24

2159.65

1600mm

1873.00

234.13

data-RCC-PE & SS. 337269598.xlsx

Page 2843 of 3205

18

1800mm

2289.00

286.13

114.45

311.65

2689.58

1800mm

2393.00
0.00

data-RCC-PE & SS. 337269598.xlsx

299.13

Page 2844 of 3205

360 up to 800
400 above 800
NP 2 Class S/S Pipes
S.N

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Barral
Dia of Pipe
Thickness in
in Mts
Mts

0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.40
1.60
1.80
2.00
2.20

0.025
0.025
0.025
0.025

0.03
0.032
0.032
0.035
0.035
0.045
0.05
0.05
0.055
0.06
0.065
0.07
0.075
0.08
0.09
0.1
0.11

Radius of
Pipe

NP 3 Class

Volume
Steel Qty
Cement Qty
per 1
in Kgsin Kg
Rmt
NP2

0.06
0.09
0.11
0.14
0.17
0.19
0.22
0.24
0.27
0.32
0.38
0.43
0.48
0.53
0.58
0.64
0.74
0.84
0.95
1.05
1.16

0.01
0.01
0.02
0.02
0.03
0.04
0.04
0.05
0.06
0.09
0.12
0.14
0.17
0.2
0.24
0.28
0.35
0.42
0.54
0.66
0.8

Barral
Dia of Pipe
Thickness in
in Mts
Mts

S.N

3.60

0.86

0.10

0.025

3.60

0.95

0.15

0.025

7.20

1.11

0.20

0.03

7.20

1.33

0.25

0.03

10.80

2.02

0.30

0.04

14.40

2.42

0.35

0.075

14.40

2.83

0.40

0.075

18.00

3.38

0.45

0.075

21.60

3.92

0.50

0.075

32.40

5.06

10

0.60

0.085

43.20

6.74

11

0.70

0.085

50.40

9.07

12

0.80

0.095

61.20

11.97

13

0.90

0.10

72.00

14.36

14

1.00

0.115

86.40

16.84

15

1.10

0.115

100.80

20.03

16

1.20

0.12

126.00

27.03

17

1.40

0.135

151.20

34.56

18

1.60

0.14

194.40

43.51

19

1.80

0.15

237.60

62.20

20

2.00

0.17

288.00

74.53

21

2.20

0.185

22

2.40

0.20

23

2.60

0.215

Vide Page No.7 of IS 458.2003 and Pg.27 for Socket

Vide Page No.8 of IS 458.2003 and Pg.27 for Sock

data-RCC-PE & SS. 337269598.xlsx

Page 2845 of 3205

8/2003 ex-Factory, ( Rate per Meter of effective length) including Transportation, Central Excice Duty,
ut Excluding VAT etc.complete.

& NP3 Pipes & Conveyance Charges - 2014-15


Lead

Add ST @

10 Km

Sub-total

5.00%
8.57
10.16
12.33
13.36
14.18
20.4
25.53
29.24
35.83
39.42
58.51
74.95
91.8
115.85
140.75
167.03
198.79

Add VAT &


LC @

Rate
excluding
Over heads

Rate including
Over heads

0%
229.65
273.96
333.19
361.99
384.54
552.37
696.66
796.75
978.38
1075.99
1596.87
2047.05
2499.39
3140.45
3855.23
4555.90
5409.39

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

206.31
246.31
299.60
325.60
345.92
496.83
627.15
717.14
880.82
968.65
1437.56
1842.95
2249.41
2824.99
3471.97
4101.09
4868.09

data-RCC-PE & SS. 337269598.xlsx

229.65
273.96
333.19
361.99
384.54
552.37
696.66
796.75
978.38
1075.99
1596.87
2047.05
2499.39
3140.45
3855.23
4555.90
5409.39

Page 2846 of 3205

269.88

7304.05

0.00

6569.17

7304.05

312.59
409.98

8452.35
11037.73

0.00
0.00

7601.18
9921.36

8452.35
11037.73

data-RCC-PE & SS. 337269598.xlsx

Page 2847 of 3205

Add ST @

Sub-total

Add VAT &


LC @

Rate
excluding
Over heads

Rate including
Over heads

5.00%
45.91
57.11
63.45

1250.40
1548.00
1724.72

0%
0.00
0.00
0.00

1125.39
1392.49
1551.95

1250.40
1548.00
1724.72

72.9

1978.17

0.00

1779.66

1978.17

79.42

2154.36

0.00

1938.10

2154.36

118.41

3220.30

0.00

2897.86

3220.30

147.21

3989.56

0.00

3588.69

3989.56

194.13

5240.86

0.00

4712.24

5240.86

243.75

6603.11

0.00

5939.38

6603.11

303.73

8209.48

0.00

7382.44

8209.48

357.55

9641.82

0.00

8668.22

9641.82

420.07

11306.50

0.00

10162.66

11306.50

542.52

14605.90

0.00

13128.61

14605.90

704.13

18908.82

0.00

16991.47

18908.82

929.51

24970.87

0.00

22439.81

24970.87

data-RCC-PE & SS. 337269598.xlsx

Page 2848 of 3205

data-RCC-PE & SS. 337269598.xlsx

Page 2849 of 3205

data-RCC-PE & SS. 337269598.xlsx

Page 2850 of 3205

data-RCC-PE & SS. 337269598.xlsx

Page 2851 of 3205

Collars for NP 2 Class PE Pipes


Volume per Cement Qty
Each Collar
in Kg

Steel Qty
in KgsNP2

0.002

0.72

0.15

0.002

0.72

0.16

0.002

0.72

0.18

0.002

0.72

0.20

0.002

0.72

0.22

0.003

1.08

0.24

0.003

1.08

0.33

0.003

1.08

0.36

0.005

1.80

0.38

0.005

1.80

0.55

0.006

2.16

0.75

0.006

2.16

1.28

0.007

2.52

2.08

0.008

3.20

2.28

0.009

3.60

2.58

0.010

4.00

3.72

0.011

4.40

4.44

0.013

5.20

0.014

5.60

5.58
7.22

0.017

6.80

9.67

0.019

7.60

13.15

0.022

8.80

14.30

data-RCC-PE & SS. 337269598.xlsx

Page 2852 of 3205

Collars for NP 3 Class PE Pipes


Volume per Cement Qty
Each Collar
in Kg

Steel Qty
in KgsNP2

0.003

1.08

0.33

0.003

1.08

0.36

0.005

1.80

0.38

0.005

1.80

0.55

0.006

2.16

0.75

0.006

2.16

1.28

0.007

2.52

2.08

0.008

3.20

2.28

0.009

3.60

2.58

0.010

4.00

3.72

0.011

4.40

4.44

0.013

5.20

0.014

5.60

5.58
7.22

0.017

6.80

9.67

0.019

7.60

13.15

0.022

8.80

14.30

data-RCC-PE & SS. 337269598.xlsx

Page 2853 of 3205

3 ex-Factory, ( Rate per Meter of effective length) including Transportation,Central Excice Duty, Sales Tax but
ing VAT etc.complete.

3 Pipes & Conveyance Charges - 2014-15


Lead

Add ST @

10 Km

Sub-total

5.00%

Add VAT &


LC @

Rate
excluding
Over heads

Rate including
Over heads

0%

10.4

278.87

0.00

249.81

278.87

12.08

326.43

0.00

292.38

326.43

15

406.90

0.00

364.43

406.90

16.24

441.93

0.00

395.78

441.93

17.48

486.44

0.00

435.48

486.44

24.6

677.31

0.00

606.46

677.31

31.3

853.67

0.00

764.50

853.67

34.67

954.34

0.00

854.52

954.34

43.15

1180.92

0.00

1057.50

1180.92

50.25

1379.96

0.00

1235.67

1379.96

70.57

1932.67

0.00

1730.67

1932.67

90.97

2492.75

0.00

2232.19

2492.75

116.28

3210.32

0.00

2874.38

3210.32

146.67

4049.77

0.00

3625.99

4049.77

178.21

4895.76

0.00

4383.82

4895.76

data-RCC-PE & SS. 337269598.xlsx

Page 2854 of 3205

208.86

5720.13

0.00

5122.26

5720.13

236.65

6494.26

0.00

5815.28

6494.26

335.46

9128.29

0.00

8175.11

9128.29

415.39

11291.10

0.00

10112.26

11291.10

data-RCC-PE & SS. 337269598.xlsx

Page 2855 of 3205

Add ST @

Sub-total

5%

Add VAT & Rate excluding


LC @
Over heads

Rate including
Over heads

0%
58.2

1591.15

0.00

1424.88

1591.15

75.59

2053.59

0.00

1839.20

2053.59

83.75

2290.99

0.00

2051.58

2290.99

92.38

2524.62

0.00

2260.83

2524.62

105.62

2881.86

0.00

2580.81

2881.86

147.59

4023.05

0.00

3602.85

4023.05

187.32

5136.12

0.00

4599.20

5136.12

247.56

6746.46

0.00

6041.83

6746.46

310.93

8438.86

0.00

7558.00

8438.86

354.23

9586.38

0.00

8586.17

9586.38

416.45

8678.56

0.00

10063.56

8678.56

490.57

13211.03

0.00

11833.65

13211.03

649.08

17465.80

0.00

15645.03

17465.80

839.16

22524.55

0.00

20177.29

22524.55

1107.85

29745.68

0.00

26645.78

29745.68

data-RCC-PE & SS. 337269598.xlsx

Page 2856 of 3205

RUBBER RINGS

1985 (RATE PER EACH RUBBER RING) including Transportation,Central Excice Duty, Sales Tax but Excluding VAT etc.complete.

Rubber Rings for RCC NP3 Pipes


Add ST @

Add CP
& OH

Add VAT &


LC @

5.00%

13.62%

0.00%

Rate
excluding
Over heads

Rate including
Over heads

7.15

19.47

168.03

187.50

8.55

23.28

200.93

224.21

9.70

26.41

227.95

254.36

11.00

29.95

258.50

288.45

12.60

34.31

296.10

330.41

18.30

49.83

430.05

479.88

21.90

59.63

514.65

574.28

26.55

72.30

623.93

696.23

35.90

97.76

843.65

941.41

43.35

118.04

1018.73

1136.77

55.50

151.13

1304.25

1455.38

69.75

189.93

1639.13

1829.06

76.75

208.99

1803.63

2012.62

93.65

255.01

2200.78

2455.79

data-RCC-PE & SS. 337269598.xlsx

Page 2857 of 3205

119.65

325.81

2811.78

data-RCC-PE & SS. 337269598.xlsx

3137.59

Page 2858 of 3205

2*

360 up to 800

6.286

400 above 800

NP 3 Class S/S Pipes


Radius of
Pipe

Volume
per 1
Rmt

Cement
Qty in Kg

Steel Qty in
Kgs-NP3

0.06

0.01

3.60

0.90

0.09

0.01

3.60

0.91

0.12

0.02

7.20

1.28

0.14

0.03

10.80

1.99

0.17

0.04

14.40

3.03

0.21

0.1

36.00

4.37

0.24

0.11

39.60

4.79

0.26

0.12

43.20

5.33

0.29

0.14

50.40

6.47

0.34

0.18

64.80

9.19

0.39

0.21

75.60

13.61

0.45

0.27

97.20

18.57

0.50

0.31

124.00

25.02

0.56

0.4

160.00

24.18

0.61

0.44

176.00

30.65

0.66

0.5

200.00

37.12

0.77

0.65

260.00

49.76

0.87

0.77

308.00

68.95

0.98

0.92

368.00

96.46

1.09

1.16

464.00

107.26

1.19

1.38

552.00

122.66

1.3

1.63

652.00

161.49

1.41

1.91

764.00

190.64

Vide Page No.8 of IS 458.2003 and Pg.27 for Socket

data-RCC-PE & SS. 337269598.xlsx

Data for Construction of Rapid gravity Filtration plant - 2014-15


Rapid gravity Filtration plant of

10.00 Mld

Basic Rate per 10 Mld RGF Plant

10.00 Mld

Variation of rates
CEMENT
Cement rate given in SSR per MT
Cement rate actual per MT
Difference
Variation of above rates due to increase / decrease in the
cost of cement = (Rc-4100) x 0.00007
STEEL
Steel rate given in the SSR per MT
Steel rate actual per MT
Difference
Variation of above rate due to increase / decrease in the
cost of steel = (RS-43000) x 0.00002
Rate per One Litre for RGF Plant of
Add contractor's profit and over heads

1740.00

0.00007

-12500.00

0.00002

10.00 Mld
14%

Add for rural areas @ 10% on basic rate.

0%

Sub-Total
VAT & labour cess

0%
Total Rs.

Data for Construction of Rapid gravity Filtration plant - 2013-14


Rapid gravity Filtration plant of

4.00 Mld

Basic Rate as per SSR

5.00 Mld

Rate per 2 Mld RGF Plant / Liter


Rate per 5 Mld RGF Plant / Liter
Difference in Rate for 3 Mld / Liter
Rate per every 1 Liter

2
5
3

Rate difference for 5 Mld RGF Plant / Liter

5.00 Mld

Basic Rate per 4 Mld RGF Plant

4.00 Mld

4.331
3.580
0.751
0.2503
4.00

Variation of rates
CEMENT
Cement rate given in SSR per MT
Cement rate actual per MT
Difference
Variation of above rates due to increase / decrease in the
cost of cement = (Rc-4100) x 0.00007
STEEL
Steel rate given in the SSR per MT
Steel rate actual per MT
Difference
Variation of above rate due to increase / decrease in the
cost of steel = (RS-43000) x 0.00002
Rate per One Litre for RGF Plant of
Add contractor's profit and over heads
Add for rural areas @ 10% on basic rate.

1740.00 0.00007

-12500.00

0.00002

4.00 Mld
14%
0%

Sub-Total
VAT & labour cess

0%
Total Rs.

Data for Construction of Rapid gravity Filtration plant - 2014-15

Rapid gravity Filtration plant of

8.50 Mld

Basic Rate as per SSR

10.00 Mld

Rate per 5 Mld RGF Plant / Liter


Rate per 10 Mld RGF Plant / Liter
Difference in Rate for 5 Mld / Liter
Rate per every 1 Liter

5
10
5

Rate difference for 10 Mld RGF Plant / Liter

3.580
3.150
0.43
0.086

10.00 Mld

Basic Rate per 8.5 Mld RGF Plant

8.50

8.50 Mld

Variation of rates
CEMENT
Cement rate given in SSR per MT
Cement rate actual per MT
Difference
Variation of above rates due to increase / decrease in the
cost of cement = (Rc-4100) x 0.00007
STEEL
Steel rate given in the SSR per MT
Steel rate actual per MT
Difference
Variation of above rate due to increase / decrease in the
cost of steel = (RS-43000) x 0.00002
Rate per One Litre for RGF Plant of
Add contractor's profit and over heads
Add for rural areas @ 10% on basic rate.
Sub-Total

1740.00

0.00007

-12500.00

0.00002

8.50 Mld
14%
0%

VAT & labour cess

0%
Total Rs.

Data for Construction of Rapid gravity Filtration plant - 2014-15

Rapid gravity Filtration plant of

44.00 Mld

Basic Rate as per SSR

20.00 Mld

Rate per 10 Mld RGF Plant / Liter


Rate per 20 Mld RGF Plant / Liter
Difference in Rate for 10 Mld / Liter
Rate per every 1 Liter

10
20
10

Rate difference for 20 Mld RGF Plant / Liter

20.00 Mld

Basic Rate per 44 Mld RGF Plant

44.00 Mld

3.150
2.760
0.39
0.039
44.00

Variation of rates
CEMENT
Cement rate given in SSR per MT
Cement rate actual per MT
Difference
Variation of above rates due to increase / decrease in the
cost of cement = (Rc-4100) x 0.00007
STEEL
Steel rate given in the SSR per MT
Steel rate actual per MT
Difference
Variation of above rate due to increase / decrease in the
cost of steel = (RS-43000) x 0.00002
Rate per One Litre for RGF Plant of
Add contractor's profit and over heads
Add for rural areas @ 10% on basic rate.

1740.00

0.00007

-12500.00

0.00002

44.00 Mld
14%
0%

Sub-Total
VAT & labour cess

0%
Total Rs.

Data for Construction of Rapid gravity Filtration plant - 2014-15


Rapid gravity Filtration plant of

6.30 Mld

Basic Rate as per SSR

10.00 Mld

Rate per 5 Mld RGF Plant / Liter


Rate per 10 Mld RGF Plant / Liter
Difference in Rate for 5 Mld / Liter
Rate per every 1 Liter

5
10
5

Rate difference for 10 Mld RGF Plant / Liter

3.580
3.150
0.43
0.086

10.00 Mld

Basic Rate per 6.3 Mld RGF Plant

6.30

6.30 Mld

Variation of rates
CEMENT
Cement rate given in SSR per MT
Cement rate actual per MT
Difference
Variation of above rates due to increase / decrease in the
cost of cement = (Rc-4100) x 0.00007
STEEL
Steel rate given in the SSR per MT
Steel rate actual per MT
Difference
Variation of above rate due to increase / decrease in the
cost of steel = (RS-43000) x 0.00002
Rate per One Litre for RGF Plant of
Add contractor's profit and over heads
Add for rural areas @ 10% on basic rate.
VAT & labour cess

1740.00 0.00007

-12500.00

0.00002

6.30 Mld
14%
0%
0%
Total Rs.

14-15

Nov-15

3.150

4000.00
5740.00
1740.00
0.122

46500.00
34000.00
-12500.00
-0.250

Rs.

3.022
0.41
0
3.432

Rs.

0.00
6.864

13-14

Nov-15

Mld

Rs.

3.580

Rs

0.25
3.830

4000.00
5740.00
1740.00
0.122

46500.00
34000.00
-12500.00
-0.250

Rs.

3.702
0.5
0.00
4.202

Rs.

0.00
4.202

14-15

Nov-15

Mld

Rs.

3.150

Rs

0.129
3.279

4000.00
5740.00
1740.00
0.122

46500.00
34000.00
-12500.00
-0.250

Rs.

Rs.

3.151
0.43
0.00
3.581
0.00
3.581

14-15

Nov-15

Mld

Rs.

2.760

Rs

-0.936
1.824

4000.00
5740.00
1740.00
0.122

46500.00
34000.00
-12500.00
-0.250

Rs.

1.696
0.23
0.00
1.926

Rs.

0.00
1.926

14-15

Nov-15

Mld

Rs.

3.150

Rs

0.32
3.468

4000.00
5740.00
1740.00
0.122

46500.00
34000.00
-12500.00
-0.250

Rs.

Rs.

3.340
0.45
0.00
3.790
3.790

Page 2869 of 3205

Building Data
GREATER VISAKHAPATNAM MUNICIPAL CORPORATION
DATA BASED ON - 2013 - 2014SSR
2nd Quarter ( November - 2013 )
EARTH WORK EXCAVATION
1

BLD-CSTN-2-1 (9): Earth work excavation for foundations and depositing on bank for all lifts and with an initial lea
labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seig
per SS - 20 B (APSS 308).

Ordinary Soil-Manual Means-Upto 3 m depth

out put

a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour -Irrigation-Unskilled-S.No.3)
Add Labour component @
Sub total
extra for foundations @

10.00
0 day
3.64 day.
20%
75%

Sub - Total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering
2

14%

0%
0%

BLD-CSTN-2-2(10) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lea
labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seig
per SS - 20 B (APSS 308).

Ordinary soils-Mechcanical Means-Upto 3 m depth

out put

a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity (R&B Hire Charges-S.No:4)

240

0 day.
8.32 day.
6.00 hours

Sub - Total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c+d)/240
Rate per 1 Cum excluding Dewatering
3

14%
0%
0%

BLD-CSTN-2-4 (12): Earth work excavation for foundations and depositing on bank for all lifts and with an initial lea
labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seig
per SS - 20 B (APSS 308).

Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m


depth
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour -Irrigation-Unskilled-S.No.3)
Add Labour component @
Sub total
extra for foundations @

out put

10.00
0 day.
5.20 day.
20%
75%

Sub - Total
c&d) Overheads & Contractors Profit
337269598.xlsx Bld data-13-14

14%

Page 2870 of 3205


Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering

337269598.xlsx Bld data-13-14

0%
0%

Page 2871 of 3205


4

BLD-CSTN-2-5 - (13) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial le
labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seig
per SS - 20 B (APSS 308).
Ordinary rock (not requiring blasting)-Mechanical Means-Upto 3 m
depth
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b) Machinery
Hydraulic Excavator 1 cum bucket capacity (R&B Hire Charges-S.No:4)

out put

180

0 day.
6.24 day.
6.00 hours

Sub total
c&d) Overheads & Contractors Profit
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/240
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering
5

0%
0%

BLD-CSTN-2-6 - (14) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial le
labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seig
per SS - 20 B (APSS 308).
Hard rock (requiring blasting)-Upto 3 m depth
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
Driller(Labour-Irrigation-Skilled-S.No:19)
Blaster(Labour-Irrigation-Skilled-S.No3)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers(Hire ChargesIrrigation-S.No:3)
c) Materials
Gelatin 80 per cent - M-104
Electric Detonators @ 1 detonator for 2 gelatine sticks of 285 gm each -M094
Sub total
d) Overheads & Contractors Profit
Sub - Total
Cost for 10 cum = a+b+c+d
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering

14%

out put

10

0 day.
0.50 day.
0.25 day.
8.35 day.
1 hours

3.50 Kg
14 Nos.

14%

0%
0%

BLD-CSTN-2-7 - (15) ; Earth work excavation for foundations and depositing on bank for all lifts and with an initial le
labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seig
per SS - 20 B (APSS 308).
Hard rock (blasting prohibited)-Upto 3 m depth
out put
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
0.00 day
Mazdoor (Labour-Irrigation-Unskilled S.No1)
5.20 day
b) Machinery
Air compressor 210 cfm / 250 cfm with 2 jack hammers(Hire Charges6.00 hour
Irrigation-S.No:3)
sub total ; a+b
c&d) Overheads & Contractors Profit
Cost for 10 cum = a+b+c+d
337269598.xlsx Bld data-13-14

14%

10.00

Page 2872 of 3205


Rate per cum = a+b+c+d+e)/10
Add VAT @
Add Labour Cess @
Rate per 1 Cum excluding Dewatering

337269598.xlsx Bld data-13-14

0%
0%

Page 2873 of 3205


7

RBR-FNDN-1 -manual means : Earthwork excavation for structures in all types of soil as per drawing and te
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead
backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for
Holes etc. by manual means,
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary Soils : for Sumps, Thrust Blocks and Man Holes etc,.
up to 3.00 Mts depth below GL
out put
10.00
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
0 Nos.
Mazdoor (Labour-Irrigation-Unskilled S.No1)
3.64 Nos.
Sub total
c&d) Overheads & Contractors Profit
14%
Cost for 240 cum = a+b+c+d
Rate per cum = (a+b+c+d)/10
Add VAT @
0%
Add Labour Cess @
0%
Rate per 1 Cum excluding Dewatering

RBR-EECD-9 -ii : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking ro
lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines
Specification Clause 302.3.5 MORD / 301 MORTH - Mechanical Means (with all lifts)
(B) Mechanical Means (with all lifts)
out put
Taking output = 36 cum
a)Labour
Mate (Labour -R&B-Second Class S.No-71)
0.000 day
Mazdoor (Labour-Irrigation-Unskilled S.No1)
10.400 day
b) Machinery
Hydraulic excavator 0.9 cum with rock breaker attachment @ 6 cum per
6.000 hour
hour
Tipper 5.5 cum capacity tipper, 1 trip per hour
6.50 hour
Credit for excavated rock found suitable for use @ 50 per cent of
-18.00 cum
excavated quantity
Total
c&d) Overheads & Contractors Profit
Cost for 36 cum = a+b+c+d
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c+d)/36

14%
0%
0%

Rate per 1 Cum


BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layers n
deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, i
P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Sand Filling

6.00

a) Material

Sand Filling in Foundations

36.00

Sand (C-Mat-S.No1)

6.00 Cum

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.00 day
0.31 day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Add VAT @
337269598.xlsx Bld data-13-14

14%
0%

Sand Filling

Page 2874 of 3205


Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

0%

Rate per 1 Cum

337269598.xlsx Bld data-13-14

Page 2875 of 3205


10

BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers n
deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, i
P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Stone Dust Filling

6.00

Gravel filling

a) Material
Gravel (C-Mat-S.No5)

6.00 Cum

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.00 day
0.31 day
Sub Total

b&c) Overheads & Contractors Profit


Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

14%
0%
0%

Rate per 1 Cum

11

BLD-CSTN-2-9 (17) : Filling with useful available excavated earth (excluding rock) in trenches, sides of foundation
exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveya
incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
out put

Re filling

Earth filling (ordinary soil)

b)Labour
Mate (Labour -R&B-Second Class S.No-71)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
b&c) Overheads & Contractors Profit
Cost for 6 cum = a+b+c
Add VAT @
Add Labour Cess @
Total
Rate per cum = (a+b+c)/6

6.00
0.00 day
0.31 day
14%
0%
0%

Rate per 1 Cum

12

BLD-CSTN-3-4 (21) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Ceme
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, fin
etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 40mm (C-Mat-S.No:57)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

0.10 day
2.36 day

Mason 1st class (Labour-Irrigation- skilled-S.No:11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)
Sub - Total
c.Overheads & Contractors Profit

14%
Sub - Total

Add VAT @
Add Labour Cess @
Grand Total

0%
0%
Rate per One Cum
337269598.xlsx Bld data-13-14

Page 2876 of 3205

337269598.xlsx Bld data-13-14

Page 2877 of 3205


13

BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materia
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 c
level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 40mm (C-Mat-S.No:57)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:
Mason 1st class (Labour-Irrigation- skilled-S.No:11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

162.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour
0.10 day
1.39 day

Sub - Total
c.Overheads & Contractors Profit

14%
Sub - Total

Add VAT @
Add Labour Cess @

0%
0%
Rate per One Cum

14

BLD-CSTN-3-6 ( 23 ) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:5:10) prop (Ceme
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, fin
etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 40mm (C-Mat-S.No:57)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class (Labour-Irrigation- skilled-S.No:11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2878 of 3205


15

BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materia
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 c
level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 40mm (C-Mat-S.No:57)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:
Mason 1st class (Labour-Irrigation- skilled-S.No:11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)
Sub - Total
c.Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum
16

129.60 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour
0.10 day
1.39 day
14%
0%
0%

BLD-CSTN-3-8 ( 25 ) -Hand mixing up to Plinth Level : Plain Cement concrete nominal mix (1:6:10) prop (Ceme
40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement,
seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, fin
etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 40mm (C-Mat-S.No:57)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)
B. LABOUR:
Mason 1st class (Labour-Irrigation- skilled-S.No:11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

129.60 Kg
0.90 Cum
0.54 Cum
1.20 Kl
0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

17

BLD-CSTN-3-9-(26) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1
aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materia
etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 c
level curing etc., complete for finished item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 40mm (C-Mat-S.No:57)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:
337269598.xlsx Bld data-13-14

129.60 Kg
0.90 Cum
0.54 Cum
1.20 Kl
1 hour

Page 2879 of 3205


Mason 1st class (Labour-Irrigation- skilled-S.No:11)
Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.10 day
1.39 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2880 of 3205


18

BLD-CSTN-3-10- ( 27 ) Hand mixing: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate
Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate
materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the re
item of work.for foundation and under flooring bed.
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 20mm (C-Mat-S.No:47)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)

220.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl

B. LABOUR:

Mason 1st class (Labour-Irrigation- skilled-S.No:11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)

0.10 day
2.36 day
Sub - Total

c.Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

19

BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix m-20 (
using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like c
site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm laye
curing etc., complete for finished item of work with nomonal reinforcement
Unit : 1cum
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Coarse aggregate 20mm graded (C-Mat-S.No:47)
Fine aggregate- Sand (C-Mat-S.No:2)
Water (including for curing) (Irrigation SSR-S.No:M189)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
B. LABOUR:

330.00 Kg
0.90 Cum
0.45 Cum
1.20 Kl
1 hour
0.10 day
1.39 day

Mason 1st class (Labour-Irrigation- skilled-S.No:11)


Mazdoor (Labour-Irrigation-Unskilled S.No1)

Sub - Total
c.Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Grand Total

14%
0%
0%
Rate per One Cum

NOMINAL MIX ( Wooden Centering )


20

BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) co
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and c
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on al
and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
but including centering and shuttering for FOUNDATIONS, PLINTH, PEDESTALS

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


M-20 Nominal mix
20mm HBG graded metal (C-Mat-S.No:47)

337269598.xlsx Bld data-13-14

0.90 Cum

Page 2881 of 3205


Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)
BASIC COST per 1 cum

337269598.xlsx Bld data-13-14

0.45 Cum
400.00 Kg
0.133 day.
0.267 day.
3.60 day.
1.000 hour
1.000 hour
1.20 Kl

Page 2882 of 3205


a

Footings
M-20 Nominal mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
Sub - Total

Add VAT @
Add Labour Cess @
Rate per One Cum
b

0%
0%

Pedastals
M-20 Nominal mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
c

14%
0%
0%

Plinth beams
M-20 Nominal mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2883 of 3205


21

BLD-CSTN-3-13- ( 30 ) - B- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) co
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and c
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on al
and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
but including centering and shuttering for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS - WO

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)
Sub Total of - C
BASIC COST per 1 cum
D. Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Total
Rate per One Cum
a

0.90 cum
0.45 cum
400.00 Kgs

0.167 day
0.167 day
4.700 day

1.00 hour
1.00 hour
1.20 kl

14%
0%
0%

Columns up to 3.66 Mts unsupported height above GL


M-20 Nominal mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Basic Cost

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
6453.21
205.00
1171.00
234.20

2F
6453.21
205.00
1288.00
257.60
117.10

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

199.905

399.81

337269598.xlsx Bld data-13-14

Page 2884 of 3205


For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd floor
(7.32 M
Winch hire charges ( 1.333 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx Bld data-13-14

8263.32
1125.05
9388.37
0.00
0.00
9388.37

8720.72
1187.33
9908.05
0.00
0.00
9908.05

Page 2885 of 3205


Columns up to 7.32 Mts unsupported height above GL
M-20 Nominal mix

1.00 Cum

Centering charges ,Pg No.106 to 111 of Bld.SSR


Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
20%
Basic Cost

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
c

14%
0%
0%

Lintels up to 3.66 Mts unsupported height above GL


M-20 Nominal mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


M-20 Nominal mix

1F
6453.21

2F
6453.21

Material Hire Charges for centering & Scaffolding

680.00

680.00

Labour Charges for centering & Scaffolding

834.00

917.00

Add extra over Labour component @ 20%

166.80

183.40

For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

83.40

199.905

399.81

8333.92
1134.66
9468.58
0.00
0.00
9468.60

8716.82
1186.80
9903.62
0.00
0.00
9903.65

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd floor
(7.32 M
Winch hire charges ( 1.333 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
d

RCC Walls of Height up to 3.66 Mts un supported Height


M-20 Nominal mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00
Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
337269598.xlsx Bld data-13-14

Page 2886 of 3205


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
22

0%
0%

BLD-CSTN-3-13- ( 30 ) - C - Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) co
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and c
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on al
and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
but including centering and shuttering for RCC SLABS, BEAMS -WOODEN SCAFFOLDING

RCC SLABS, BEAMS - (WOODEN SCAFFOLDING)


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)

0.90 cum
0.45 cum
400.00 Kgs

Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)
Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Total
Rate per One Cum
a

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

0.067 day
0.133 day
2.500 day

0.267 hour
0.267 hour
1.200 kl

14%
0%
0%

115 mm
1.00 Cum
8.70 Sqm
8.70 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2887 of 3205


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
5192.84
1183.20
965.70
193.14

2F
5192.84
1183.20
1061.40
212.28
96.57

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

107.24

214.48

7642.12
1040.47
8682.59
0.00
0.00
8682.60

7960.77
1083.86
9044.63
0.00
0.00
9044.65

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd floor
(7.32 M
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
b

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

350 mm
1.00 Cum
2.86 Sqm
2.86 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
5192.84
388.96
317.46
63.49

2F
5192.84
388.96
348.92
69.78
31.75

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

107.24

214.48

6069.99
826.43
6896.42
0.00

6246.73
850.49
7097.22
0.00

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd floor
(7.32 M
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
Sub - Total
Add VAT @
337269598.xlsx Bld data-13-14

Page 2888 of 3205


Add Labour Cess @
Rate per One Cum

0.00
6896.45

337269598.xlsx Bld data-13-14

0.00
7097.25

Page 2889 of 3205


c

RCC M 20 Slabs
R.C.C. M 20 nominal mix Per Cum
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

150 mm
1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
5192.84
907.12
740.37
148.07

2F
5192.84
907.12
813.74
162.75
74.04

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

107.24

214.48

7095.64
966.07
8061.71
0.00
0.00
8061.75

7364.97
1002.74
8367.71
0.00
0.00
8367.75

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd floor
(7.32 M
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2890 of 3205


d

RCC Beams - Nominal Mix ( Wooden centering )


RCC Beams up to 3.66 Mts height
M-20 Nominal mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
5192.84
1201.00
982.00
196.40

2F
5192.84
1201.00
1080.00
216.00
98.20

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

107.24

214.48

Winch hire charges ( 0.27 x 527.90 )


Total
Overheads & Contractors Profit @ 0.14
Sub - Total

7679.48
1045.56
8725.04

8002.52
1089.54
9092.06

Add VAT @
Add Labour Cess @
Rate per One Cum

0.00
0.00
8725.05

0.00
0.00
9092.10

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd floor
(7.32 M

RCC M20 for Sun shades of 0.60M width, 75mm th. at fixed end and
50mm th. at free end - up to 3.66m above GL
M-20 Nominal mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Sqm

337269598.xlsx Bld data-13-14

Page 2891 of 3205


Rate for other Floors
M-20 Nominal mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 20%
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
324.55
134.00
128.00
25.60

2F
324.55
134.00
141.00
28.20
12.80

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

107.24

214.48

719.39
97.94
817.33
0.00
0.00
817.35

855.03
116.41
971.44
0.00
0.00
971.45

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed for each additional floor (3.66 M) over and above 2nd floor
(7.32 M
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Sub - Total
Add VAT @
Rate per One Cum
DESIGN MIX ( Steel Scaffolding & Concrete Mixer )
23

BLD-CSTN-3-14-(31) - A: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyan
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel a
work (APSS No. 402)with minimum cement content as per IS code for FOUNDATIONS, PLINTH, PEDESTALS ( us

FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)


RCC-M-25- Design Mix
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)
BASIC COST per 1 cum

0.80 Cum
0.40 Cum
380.00 Kg
0.133 day.
0.267 day.
4.60 day.
1.333 hour
1.333 hour
1.20 Kl

Footings
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component on Labour charges @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
337269598.xlsx Bld data-13-14

Page 2892 of 3205


Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2893 of 3205


b

Pedastals
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
c

14%
0%
0%

Plinth beams
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum
24

14%
0%
0%

BLD-CSTN-3-15- ( 31 ) -B : Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyan
(sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials
charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel a
work (APSS No. 402)with minimum cement content as per IS code for COLUMNS, LINTELS, WATER TANKS, RCC

COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS ( Steel Scaffolding & Concrete Mixer )
A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47)
0.80 cum
Sand - (C-Mat-S.No:2)
0.40 cum
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)
380.00 Kgs
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
0.167 day
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
0.167 day
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
5.600 day
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
1.333 hour
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
1.333 hour
Water (including for curing) (Irrigation SSR-S.No:M189)
1.20 kl
Sub Total of - C
BASIC COST per 1 cum
D. Overheads & Contractors Profit
14%
sub total
Add VAT @
0%
Add Labour Cess @
0%
Total
Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2894 of 3205


Columns up to 3.66 Mts unsupported height above GL
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Basic Cost

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors

1F

2F

RCC-M-25- Design Mix

6661.07

6661.07

Material Hire Charges for centering & Scaffolding


Labour Charges for centering & Scaffolding

296.00
1491.00

296.00
1640.00

Add extra over Labour component @ 0.4


For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

298.20

328.00
149.10

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

235.19

470.37

8981.46
1222.83
10204.29
0.00
0.00
10204.30

9544.54
1299.49
10844.03
0.00
0.00
10844.05

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
b

Columns up to 7.32 Mts unsupported height above GL


RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Basic Cost

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2895 of 3205


Lintels up to 3.66 Mts unsupported height above GL
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-25- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
6661.07
984.00
1062.00
212.40

2F
6661.07
984.00
1168.00
233.60
106.20

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

235.19

470.37

9154.66

9623.24

1246.41

1310.20

10401.07

10933.44

Add VAT @

0.00

0.00

Add Labour Cess @

0.00

0.00

10401.10

10933.45

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 1.333 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total

Rate per One Cum


d

RCC Walls of Height up to 3.66 Mts un supported Height


RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR

1.00
Cum
1.00 Cum

Labour charges Pg No.106 to 111 of Bld.SSR

1.00 Cum

Add Labour component @

20%
Sub - Total

Overheads & Contractors Profit

14%

sub total
Add VAT @

0%

Add Labour Cess @

0%

Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2896 of 3205


RCC Walls of Height up to 7.32 Mts un supported Height
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR

1.00
Cum
1.00 Cum

Labour charges Pg No.106 to 111 of Bld.SSR

1.00 Cum

Add Labour component @

20%
Sub - Total

Overheads & Contractors Profit

14%

Sub - Total
Add VAT @

0%

Add Labour Cess @

0%

Rate per One Cum


25

BLD-CSTN-3-16-(31)-C: Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIG
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of al
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials in
charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel a
work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by th
shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges
BEAMS

RCC SLABS, BEAMS ( Steel Scaffolding & Concrete Mixer )


A. MATERIALS:
20mm HBG graded metal (C-Mat-S.No:47)
Sand - (C-Mat-S.No:2)
Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
C. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity (Hire Charges-Irrigation
S.No16)
Vibrator hire charges ( hire- irrigation-S.N.41)
Water (including for curing) (Irrigation SSR-S.No:M189)

0.80 cum
0.40 cum
380.00 Kgs

0.067 day
0.133 day
3.077 day

0.308 hour
0.308 hour
1.200 kl

Sub Total of - C
BASIC COST per 1 cum
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


A
i

RCC Dome
RCC Dome up to 3.66 Mts height
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit

14%
337269598.xlsx Bld data-13-14

Page 2897 of 3205


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

0%
0%

337269598.xlsx Bld data-13-14

Page 2898 of 3205


B
B-I
i

RCC SLABS

RCC Slabs up to 3.66 Mts unsupported height above GL


RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

100 mm
1.00 Cum
10.00 Sqm
10.00 Sqm
20%
Sub - Total

ii

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%

RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

110 mm
1.00 Cum
9.09 Sqm
9.09 Sqm
20%

0%
0%

Sub - Total
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-25- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

1F
5141.13
1790.73
1290.78
258.16
129.86

2F
5141.13
1790.73
1418.04
283.61
129.08
1038.57

8610.66
1172.34
9783.00
0.00
0.00
9783.00

9801.16
1334.43
11135.59
0.00
0.00
11135.60

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

115 mm
1.00 Cum
8.70 Sqm
8.70 Sqm
20%
Sub - Total

Overheads & Contractors Profit


sub total

14%

337269598.xlsx Bld data-13-14

Page 2899 of 3205


Add VAT @
Add Labour Cess @
Rate per One Cum

0%
0%

337269598.xlsx Bld data-13-14

Page 2900 of 3205


Rate for other Floors
RCC-M-25- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

1F
5141.13
1713.90
1235.40
247.08

2F
5141.13
1713.90
1357.20
271.44
123.54

129.86

259.72

8467.37
1152.83
9620.20
0.00
0.00
9620.20

8866.93
1207.23
10074.16
0.00
0.00
10074.20

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
iii

RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

120 mm
1.00 Cum
8.33 Sqm
8.33 Sqm
20%
Sub - Total

iv

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%

RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

125 mm
1.00 Cum
8.00 Sqm
8.00 Sqm
20%

0%
0%

Sub - Total
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%

Rate per One Cum


RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

140 mm
1.00 Cum
7.14 Sqm
7.14 Sqm
20%

0%
0%

Sub - Total
Overheads & Contractors Profit
Sub - Total
Add VAT @

14%
0%
337269598.xlsx Bld data-13-14

Page 2901 of 3205


Add Labour Cess @
Rate per One Cum

0%

337269598.xlsx Bld data-13-14

Page 2902 of 3205


Rate for other Floors
RCC-M-25- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour,
increaseLifting
@ 10%
charges
each upper
floor on only,
Ground
For Mechanical
of on
all labour
RCC items:
Liftfor
Charges
of Materials
for
Floor
Rate
lifting
above
6.1x 527.90
M (2nd )floor onwards) Winch/ Lift hire charges
WinchConcrete
hire charges
( 0.27
shall be allowed at the rates as given below:
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
v

RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1F
5141.13
1406.58
1013.88
202.78
129.86

2F
5141.13
1406.58
1113.84
222.77
101.39
259.72

7894.23
1074.80
8969.03
0.00
0.00
8969.05

8245.43
1122.61
9368.04
0.00
0.00
9368.05

150 mm
1.00 Cum
6.67 Sqm
6.67 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-25- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

1F
5141.13
1313.99
947.14
189.43
129.86

2F
5141.13
1313.99
1040.52
208.10
94.71
259.72

7721.55
1051.29
8772.84
0.00
0.00
8772.85

8058.18
1097.12
9155.30
0.00
0.00
9155.30

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2903 of 3205


vi

RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

175 mm
1.00 Cum
5.71 Sqm
5.71 Sqm
20%
Sub - Total

vii

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%

RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

200 mm
1.00 Cum
5.00 Sqm
5.00 Sqm
20%

0%
0%

Sub - Total
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Cum


Rate for other Floors
RCC-M-25- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate
For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting
above
6.1x 527.90
M (2nd )floor onwards) Winch/ Lift hire charges
WinchConcrete
hire charges
( 0.27
shall be allowed at the rates as given below:
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
viii

RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1F
2F
5141.13 5141.13
1015.00
1015.00
730.000 805.000
146.000 161.000
73.00
129.86 259.72

7161.99 7454.85
975.10 1014.98
8137.09
8469.83
0.00
0.00
0.00
0.00
8137.09
8469.83
250 mm
1.00 Cum
4.00 Sqm
4.00 Sqm
20%

Sub - Total
Overheads & Contractors Profit
Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2904 of 3205

337269598.xlsx Bld data-13-14

Page 2905 of 3205


ix

RCC M 20 Slabs
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

350 mm
1.00 Cum
2.86 Sqm
2.86 Sqm
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

RCC Beams:( Steel Scaffolding )

RCC Beams up to 3.66 Mts height


RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

1.00 Cum
1.00 Cum
1.00 Cum
20%
Sub - Total

Overheads & Contractors Profit


Sub - Total
Add VAT @
Add Labour Cess @
Rate per One Cum

14%
0%
0%

Rate for other Floors


RCC-M-25- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed
For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

1F
5141.13
1737.00
1251.00
250.20

2F
5141.13
1737.00
1376.00
275.20
125.10

129.86

259.72

8509.19
1158.53
9667.72
0.00
0.00
9667.75

8914.15
1213.66
10127.81
0.00
0.00
10127.85

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2906 of 3205


D

RCC M -20 for Sun shades of 0.60M width, 75mm th. at fixed end and
50mm th. at free end
RCC-M-25- Design Mix
Centering charges ,Pg No.106 to 111 of Bld.SSR
Labour charges Pg No.106 to 111 of Bld.SSR
Add Labour component @

0.0625 Cum
1.00 Sqm
1.00 Sqm
20%

Overheads & Contractors Profit


Sub total
Add VAT @
Add Labour Cess @

14%
0%
0%
Total

Rate per One Sqm


Rate for other Floors
RCC-M-25- Design Mix
Material Hire Charges for centering & Scaffolding
Labour Charges for centering & Scaffolding
Add extra over Labour component @ 0.4
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 10% on labour component for each upper floor on First Floor
Rate (7.32 M) shall be allowed

1F
321.32
194.00
163.00
32.60

2F
321.32
194.00
179.00
35.80
16.30

For Manual lifting of all RCC items up to 3 Floors only: Lift Charges of
Labour, increase @ 10% on labour charges for each upper floor on Ground
Floor Rate

8.12

16.23

719.04
97.90
816.94
0.00
0.00
816.95

762.65
103.83
866.48
0.00
0.00
866.50

For Mechanical Lifting of all RCC items: Lift Charges of Materials only, for
lifting Concrete above 6.1 M (2nd floor onwards) Winch/ Lift hire charges
shall be allowed at the rates as given below:
Winch hire charges ( 0.27 x 527.90 )
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

337269598.xlsx Bld data-13-14

Page 2907 of 3205


26

BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild s
per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bend
position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG
approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as over
cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting
sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage -(ENCPH.Memo.No.146/Cement
& Steel
T13,
/ 2013-14)
Binding wire- SSR (Irrigation)
item /No
Pg 325
B) LABOUR for cutting, bending, shifting to site, tying, lap splicing and
placing in position
Blacksmith / Bar bender (Labour-Irrigation-Skilled-S.N.1)
Cost for 240 cum = a+b+c+d

1.05 Ton
6.00 kg

10.00 day
10.00 day

(c) Labour allowance on B (included in labour rates)

(d) Contractors profit on (a+b+c)


Rate per t = a+b+c+d
Add VAT @
Add Labour Cess @
Rate per One MT
Rate per One Kg

Ground moulded size 23x11x7 Cm - (1:6)

27

28

14%
0%
0%

MASONRY
BLD-CSTN-5-1 (39) ; Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including a
scaffoding charges lift charges , curing charges etc., complete for finished item of work
A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Bricks traditional size 23 x 11 x 7 cms 2nd class ( C-Mat-S.No.58)
Sand - (C-Mat-S.No:2)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
Total A+B
c.Overheads & Contractors Profit
Sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

96.00 Kg
512 Nos
0.20 Cum

0.24 day.
0.56 day.
1.89 day.

14%
0%
0%

BLD-CSTN-5-2 (40) : Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including a
scaffoding charges lift charges , curing charges etc., complete for finished item of work

d size 23x11x7 Cm - (1:4)

A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Bricks traditional size 23 x 11 x 7 cms 2nd class ( C-Mat-S.No.58)
Sand - (C-Mat-S.No:2)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
337269598.xlsx Bld data-13-14

72.00 Kg
512 Nos
0.20 Cum

0.24 day.

Ground moulded size 23x11x7


29

Page 2908 of 3205


2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Sub Total of - B
Total A+B
c.Overheads & Contractors Profit
Sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

0.56 day.
1.89 day.

14%
0%
0%

BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor
Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including a
scaffoding charges lift charges , curing charges etc., complete for finished item of work

Ground moulded size 23x11x7 Cm - (1:6)

A. MATERIALS:

Cement (ENC-PH.Memo.No.146/Cement & Steel / T1 / 2013-14)


Bricks traditional size 23 x 11 x 7 cms 2nd class ( C-Mat-S.No.58)
Sand - (C-Mat-S.No:2)
Sub Total of - A
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Total A+B
c.Overheads & Contractors Profit
Sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

48.00 Kg
512 Nos
0.20 Cum

0.24 day.
0.56 day.
1.89 day.

14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

1F
3509.78
39.09
236.26
47.25

2F
3509.78
39.087
334.83
66.97
118.13

3832.38
521.78
4354.16
0.00
0.00
4354.20

4068.79
553.97
4622.76
0.00
0.00
4622.80

0 x 140 mm - (1:6)

30 BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyanc
charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Supe
A. MATERIALS:

Flyash Blocks size 29 x 15 x 14 cms (C-Mat, S.No.63)


Cost of Cement Mortar ( 1:6) - ( Mortars-S.No.h)
B. LABOUR:
337269598.xlsx Bld data-13-14

148 Nos
0.10 Cum

Flyash blocks - 290 x 2000 x 140 mm - (

Page 2909 of 3205


1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Total A+B
c.Overheads & Contractors Profit
Sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

337269598.xlsx Bld data-13-14

0.42 day.
0.92 day.
2.80 day.
14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

1F
3725.15
44.95
271.70
54.34
4096.14
557.69
4653.83
0.00
0.00
4653.85

2F
3725.15
44.95
385.05
77.01
89.74
4321.90
588.43
4910.33
0.00
0.00
4910.35

31

BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:8) prop with Flyash Cement solid blocks of size 290 x 200
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyanc
charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Supe

Flyash blocks - 290 x 150 x 140 mm - (1:6)

Flyash block

Page 2910 of 3205

A. MATERIALS:

Flyash Blocks size 29 x 20 x 14 cms (C-Mat, S.No.62)


Cost of Cement Mortar ( 1:6) - ( Mortars-S.No.h)
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Total A+B
c.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

0.42 day.
0.92 day.
2.80 day.
14%
0%
0%

1F
3709.15
44.95
271.70
54.34
4080.14
555.51
4635.65
0.00
0.00
4635.65

2F
3709.15
44.95
385.05
77.01
135.85
4352.01
592.53
4944.54
0.00
0.00
4944.55

32

BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/10
blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyanc
charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Supe

90 x 100 x 140 mm - (1:6)

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

110 Nos
0.10 Cum

A. MATERIALS:

Flyash Blocks size 29 x 10 x 14 cms (C-Mat, S.No.63)


Cost of Cement Mortar ( 1:6 ) ( Mortars-g)
B. LABOUR:
1st Class Mason (Labour-Irrigation- skilled-S.No:11)
2nd Class Mason ( labour-R&B-Semi skilled-S.N.44)
337269598.xlsx Bld data-13-14

198 Nos
0.10 Cum
0.42 day.
0.92 day.

Flyash blocks - 290 x 100 x 140

Page 2911 of 3205


Mazdoor (Both Men & Women) (Labour -Irrigation-Unskilled-S.No.3)
Total A+B
c.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per One Cum

2.80 day.

14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2912 of 3205


Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum
33

1F
3731.15
74.92
452.83
90.57
4349.47
592.18
4941.65
0.00
0.00
4941.65

2F
3731.15
74.92
641.75
128.35
226.42
4802.58
653.87
5456.45
0.00
0.00
5456.50

BLD-CSTN-5-11 (49) : 11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second cl
materials, seigniorage charges, labour and all operations for constructing half brick masonry, mixing cement mor
work, but excluding conveyance charges of materials.

11.5 cm wide Brick masonry - (1:3)

A. MATERIALS:

Bricks traditional size 23 x 11 x 7 cms 2nd class


Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Add Water charges@ 1%
Total A+B
c.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M Total
increase
@ 50%
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

34

565 Nos
106.00 Kg
0.22 Cum
0.60 day.
0.60 day.
2.75 day.
1%
14%
0%
0%

1F
4580.86
89.90
543.40
108.68
5322.84
724.70
6047.54
0.00
0.00
6047.55

2F
4580.86
89.90
770.10
154.02
271.70
5866.58
798.73
6665.31
0.00
0.00
6665.35

BLD-CSTN-6-5-(60) : Construction of CRS Masonary 1st Sort in Cement Mortor ( 1:6 ) Prop using hard gran
materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour cha
shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
337269598.xlsx Bld data-13-14

67.20 Kg
0.94 Cum
0.16 Cum
0.28 Cum
2.50 day

Page 2913 of 3205


Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

2.32 day
14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2914 of 3205


35

BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard gran
materials like Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour cha
shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

36

1.50 day
2.32 day
14%
0%
0%

BLD-CSTN-6-12-(67) : Construction of RR Masonary in Cement Mortor ( 1:6 ) Prop using hard granite stone incl
Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting
Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Rough Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per One Cum

37

76.80 Kg
0.94 Cum
0.16 Cum
0.32 Cum

79.20 Kg
0.44 Cum
0.50 Cum
0.16 Cum
0.33 Cum
1.20 day
2.00 day
14%
0%
0%

BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone incl
Cement, Sand , Water, Granite Stones, including Seigniorage Charges on all Materials, ,labour charges for cutting
Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
A. MATERIALS:
Cement
Coursed Rubble Stone
Rough Stone
Bond Stones 7Nos 0.24 x 0.24 x 0.39 = 0.16cum
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
337269598.xlsx Bld data-13-14

59.40 Kg
0.44 Cum
0.50 Cum
0.16 Cum
0.33 Cum
1.20 day
2.00 day
14%

Page 2915 of 3205


Add VAT @
Add Labour Cess @
Rate per One Cum

0%
0%

337269598.xlsx Bld data-13-14

Page 2916 of 3205


38

POINTING AND PLASTERING


BLD-CSTN-7-1-(72) : Providing flush Cement Pointing to CRS Masonary in Cement Mortor (1:3) Prop . for includin
seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item of wor
A. MATERIALS:
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

39

14.40 Kg
0.03 Cum
0.50 day
0.74 day
14%
0%
0%

BLD-CSTN-7-3-(74) : Providing raised Cement Pointing to RR Masonary in Cement Mortor (1:3) Prop . for includin
seignaiorage charges on all materials, labour charges on all materials, curing etc., Complete for finished item of wor
A. MATERIALS:
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

40

28.80 Kg
0.06 Cum
0.50 day
0.74 day
14%
0%
0%

BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and co
charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., includin
complete for finished item of work. (As per SS 903). per 10 Sqm.( only for Ceiling)
A. MATERIALS:
Cement Mortor (1:3)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

0.15 Cum
0.60 day
0.96 day
14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding ( for Ceiling)
Labour Charges for Scaffolding ( for Ceiling)
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase @ 50%
337269598.xlsx Bld data-13-14

1F
1225.90
21.10
110.80
22.16

2F
1225.90
21.10
155.70
31.14
55.40

Page 2917 of 3205


Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

337269598.xlsx Bld data-13-14

1379.96
187.88
1567.84
0.00
0.00
1567.85

1489.24
202.76
1692.00
0.00
0.00
1692.00

Page 2918 of 3205


41

BLD-CSTN-8-2-(77) : Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and co
charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., includin
complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

0.15 Cum
0.60 day
0.96 day
14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
42

1224.70
166.74
1391.44
0.00
0.00
1391.45

2F
1123.30
9.00
99.70
19.94
38.50
1290.44
175.69
1466.13
0.00
0.00
1466.15

BLD-CSTN-8-4-(79): Plastering with 12mm thick in single coat in CM (1:6) finished smooth including cost and con
charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., includin
complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:6)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

43

1F
1123.30
9.00
77.00
15.40

0.15 Cum
0.60 day
0.96 day
14%
0%
0%

BLD-CSTN-8-6-(81) : Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and co
charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., includin
complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B

0.19 Cum
0.60 day
0.96 day

337269598.xlsx Bld data-13-14

Page 2919 of 3205


C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2920 of 3205


Rate for other Floors
Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
44

1318.25
179.48
1497.73
0.00
0.00
1497.75

2F
1244.09
9.00
77.00
15.40
27.15
1372.64
186.88
1559.52
0.00
0.00
1559.55

BLD-CSTN-8-7-(82) : Plastering with 20mm thick in single coat in CM (1:4) finished smooth including cost and co
charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., includin
complete for finished item of work. (As per SS 903). per 10 Sqm.
A. MATERIALS:
Cement Mortor (1:4)
B. LABOUR:
Mason 1st class
Mazdoor (unskilled)
Total A+B
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

45

1F
1244.09
9.00
54.30
10.86

0.21 Cum
0.94 day
1.60 day
14%
0%
0%

BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of
finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charg
charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessa
uneven surfaces of walls. (External walls)
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM(1:6), 16 mm thick
Cement
Fine aggregate (Sand)
Top Coat in CM(1:4), 4 mm thick
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

43.00 Kg
0.18 Cum
14.50 Kg
0.04 Cum
0.63 day
1.47 day
3.90 day
14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
337269598.xlsx Bld data-13-14

1F
2972.27
9.00
54.30

2F
2972.27
9.00
77.00

Page 2921 of 3205


Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

337269598.xlsx Bld data-13-14

10.86
3046.43
414.77
3461.20
0.00
0.00
3461.20

15.40
27.15
3100.82
422.18
3523.00
0.00
0.00
3523.00

Page 2922 of 3205


46

BLD-CSTN-8-10 - (85) : Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat o
finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charg
charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary
Unit = 10 sqm
A. MATERIALS:
Base Coat in CM (1:5), 8 mm thick
Cement
Fine aggregate (Sand)
Top Coat in CM (1:4), 4 mm thick
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total
C.Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

31.70 Kg
0.11 Cum
19.20 Kg
0.04 Cum
0.63 day
1.47 day
3.90 day
14%
0%
0%

Rate for other Floors


Basic rate per 1Cum
Material Hire Charges for Scaffolding
Labour Charges for Scaffolding
Add extra over Labour component
For Material lift Charges & Labour rate for scaffolding above 7.32 M increase
@ 50%
Total
Overheads & Contractors Profit @ 0.14
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
47

1F
2885.07
9.00
54.30
10.86
2959.23
402.90
3362.13
0.00
0.00
3362.15

2F
2885.07
9.00
77.00
15.40
27.15
3013.62
410.30
3423.92
0.00
0.00
3423.95

BLD-CSTN-8-11-(86) : RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforc
dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & other ta
cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges
excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903)
Unit - 10 sqm
A) MATERIALS
Rabbit wire mesh - BMT-F.27
Cement Mortar 1:3 for 25 mm thick
Dry Cement for making Lumps
12 mm plastering 2 coats in 1:4 & 1:2 cm both sides
Excluding HYSD Steel/ Mild steel & Binding wire
B) LABOUR CHARGES
1st Class Mason
Miller Operator
Mazdoor (unskilled)
c) Machinery
Machine Mixing Mortar with Miller - Hire charges
Total
over heads & contractors profit
337269598.xlsx Bld data-13-14

13.30 sqm
0.25 cum
50.00 kg
21.80 sqm

8.00 day
1.00 day
10.00 day
2.00 Hrs
14%

Page 2923 of 3205


sub total
Add VAT @
Add Labour Cess @

0%
0%
Rate per 10 Sqm

337269598.xlsx Bld data-13-14

Page 2924 of 3205


FLOORING, DADOING, CLADING & SKIRTING
48

BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs) set
CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jo
cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges,
etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Polished Shahabad/ Tandur stone slabs of 15 to 18 mm thick (0.457x0457)
Cement for CM (1:8) proportion for base coat
Cement for slurry
Cement for jointing
Sand for CM (1:8) proportion
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Add water charges 1%
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

49

11.00 sqm
21.60 kg.
33.00 kg.
20.00 kg.
0.12 cum
3.10 day
1.10 day
0.86 day

14%
0%
0%

BLD-CSTN-9-2-(100) : Flooring with 40 mm thick Rough Cuddapah/Shabad stones, set over base coat of cement m
laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all material
etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for fin
conveyance of all materials.
A. MATERIALS:
Shahabad / Tandur Rough Stone slabs of minimum 40 mm thick
Cement for CM (1:8) proportion for base coat
Cement for CM 1:3 proportion for pointing
Sand for CM (1:8) proportion
Sand for CM (1:3) proportion
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskilled)
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @

10.50 Sqm
21.60 Kg
9.60 Kg
0.12 Cum
0.02 Cum
0.960 day
2.240 day
3.30 day
14%
0%
0%

Rate per 10 Sqm

337269598.xlsx Bld data-13-14

Page 2925 of 3205


50

BLD-CSTN-9-4-(102) : Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coa
bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per
mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete
finished item of work, but excluding the cost of conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 22 mm thick (medium shade)
Cement for CM (1:6) proportion for base coat
Cement for slurry
Cement for jointing & pointing
Pigment
Sand for CM (1:6) proportion
B. MACHINERY
Nill
C. LABOUR
Mason 2nd class
Man mazdoor
Mazdoor (unskiled)

10.50 sqm
28.80 kg.
33.00 kg.
6.00 kg.
0.00 kg.
0.12 cum

0.960 day
2.240 day
3.30 day

Add water charges 1%


Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @

1.00%
14%
0%
0%
Rate per 10 Sqm

51

BLD-CSTN-9-5-(103) : Flooring with vitrified tiles 1st quality of size -900x900, set over base coat of cement m
laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed
mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., co
complete for finished item of work, but excluding the cost of conveyance of all materials.
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size -900x900x10mm
Cement for CM (1:8) for base coat
Cement for slurry
Cement for Pointing with CM (1:3)
Sand for CM (1:8)
Sand for pointing
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @

10.50
21.60
33.00
6.000
0.12
0.020

sqm
kg.
kg.
kg.
cum
cum

0.96
2.24
3.30

day
day
day

1.00%
14%
0%
0%
Rate per 10 Sqm

337269598.xlsx Bld data-13-14

Page 2926 of 3205


52

BLD-CSTN-9-6-(104) : Flooring with ceramic tiles (Non skid type), set over base coat of cement mortar (1:8), 1
roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with
pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, inclu
finished item of work, but excluding the cost of conveyance of all materials. (For Toilets)
Unit = 10 sqm
A. MATERIALS:

Ceramic tiles
Cement for CM (1:8) for base coat
Cement for slurry
White cement
Sand for CM (1:8)
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @

10.50 sqm
21.60 kg.
33.00 kg.
2.00 kg.
0.12 cum
0.96 Nos
2.24 Nos
3.30 Nos
1.00%
14%
0%
0%
Rate per 10 Sqm

53

BLD-CSTN-9-7-(105) : Flooring with high polished granite 16 to 18 mm mm thick slabs other than black set o
thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @
cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, s
seigniorage charges, labour charges for dressing of tilesetc., complete for finished item of work, but excluding the co

Unit = 10 sqm
A. MATERIALS:
High polished granite 16 to 18 mm thick slab other than black

10.50 sqm

Cement for CM (1:8) for base coat


Cement for slurry
White cement for jointing & pointing
Cement for jointing
Sand for CM (1:8)
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit

36.00 kg.
33.00 kg.
6.00 kg.
kg.
0.20 cum
3.00 day
1.00 day
8.00 day
1.00%
14%
Sub Total

Add VAT @
Add Labour Cess @
Total cost for 10 sqm

0%
0%
Rate per 10 Sqm

337269598.xlsx Bld data-13-14

Page 2927 of 3205


54

BLD-CSTN-9-13-(111) : Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard
bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top su
thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorag
work.
A. MATERIALS:
6mm to 12 mm H.G. Metal (Machine crushed)
Cement
Sand
B. LABOUR:
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

55

1.25 day
0.06 day
3.00 day
1.00%
14%
0%
0%

BLD-CSTN-9-15-(113): Flooring with Cement Concrete 1:6:10, using 40mm metal, 100mm thick and plastered over
top surface to required smoothness and slopes and thread lining including cost of all materials like cement, me
seigniorage charges, etc., complete for finished item of work.
Unit = 10 sqm
A. MATERIALS:
Cement Concrete 1:6:10 using concrete mixer
Plastering with CM (1:3), 12 mm thick
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

56

0.17 Cum
120.00 Kg
0.085 Cum

1.00 cum
10.00 sqm
0.15 day
0.35 day
5.40 day
1.00%
14%
0%
0%

BLD-CSTN-9-18-(116): Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm
base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sq
with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,
complete for finished item of work, but excluding the cost of conveyance of all materials
Unit = 10 sqm
A. MATERIALS:
Ceramic tiles 7.30 mm thick
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing
B. LABOUR
Mason 1st class
Mazdoor (unskiled)

10.50 sqm
0.12 cum
57.60 kgs
33.00 kgs
6.00 kgs
0.77 Nos
0.80 Nos
337269598.xlsx Bld data-13-14

Page 2928 of 3205


Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm
57

14%
0%
0%

BLD-CSTN-9-23-(121): Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm thick poli
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the ra
cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad s
including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all m
Unit = 10 sqm
A. MATERIALS:
15 to 18 mm thick polished Shahabad stone (White)
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

58

11.00 sqm
0.12 cum
57.60 kgs
33.00 kgs
0.96 Nos
2.24 Nos
3.10 Nos
1.00%
14%
0%
0%

BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with Glazed colour tiles of any size 1st quality set o
and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Me
mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, wate
incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for

A. MATERIALS:
Colour glazed tiles of 1st quality
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing
B. LABOUR
Mason Ist class
Mazdoor (unskiled)
Add water charges 1%
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

10.50 Sqm
0.12
cum
57.60
kgs
33.00
kgs
6.00
kgs
0.77
0.80
1.00%
14%
0%
0%

337269598.xlsx Bld data-13-14

day
day

Page 2929 of 3205


59

WATER PROOFING AND PAINTING


BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick
cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding convey
operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing,
complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
Cement Mortal 1:3
Water proof compound
B. LABOUR
Mason 1st class
Mason 2nd class
Mazdoor (unskiled)
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

60

0.210 Cum
2.000 Kg
0.660 day
1.540 day
3.70 day
14%
0%
0%

BLD-CSTN-10-3-(126) ; Roofing with corrugated G.I sheets 1.25mm thick fixed with G.I J bolts & nuts 8 mm dia
white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets co
charges, turnover tax etc., complete, excluding the cost of purlins, rafters, trusses & cost of conveyance of all materi
Unit = 184.518 sqm
A. MATERIALS:
Plain or Corrugated Galvanized iron sheets as per IS 277 (0.1 mm to 0.8
mm thickness) - (BMT-E.20)

154.80 kgs

G.I scam bolts & nuts 2 x 27 (laps) x 17 = 884(BMS-W.62) Sl No.937 Pg


No.73
G.I J bolts 8 mm dia 2 x 5 x 27 sheets x 3 nos = 810 nos.(BMS-W.64) Sl
No.939 Pg No.73
Limpet washers (for scam & J bolts)
884 + 810 = 1694 (BMS-W.66) Sl
No.941 Pg No.74

47.91 nos

Bitumen washers (BMS-W.67) Sl No.942 Pg No.74


Zinc cromate yellow paint (BMT-J.04) Sl No-356 Pg 23
Ready mixed paint (BMT-J.28) Sl.No.380
B. LABOUR
For roofing
Carpenter II class
Man mazdoor (beldar)
For premier painting one coat
Painter
Mazdoor (coolie)
For two coats of painting to over laps
Painter
Mazdor (coolie)
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Grand Total
Rate per 10 sqm = Grand Total/10

91.82 nos
0.14 litre
0.20 litre

337269598.xlsx Bld data-13-14

43.90 nos
91.82 nos

0.84 day
0.91 day
0.06 day
0.06 day
0.14 day
0.14 day
14%
0%
0%

Page 2930 of 3205


Rate per 1Sqm

337269598.xlsx Bld data-13-14

Page 2931 of 3205


61

BLD-CSTN-10-4-(127); Roofing with 6 mm thick corrugated asbestos cement sheets, fixing with G.I J bolts &
including seigniorage charges etc., complete for finished item of work, but excluding the cost of purlins, rafters, tru
upto 600 pitch.
Unit = 216.14 sqm
A. MATERIALS:
6 mm thick corrugated AC sheets - BMT-E.17, Sl No.123 -Pg 16
8 mm dia G.I J bolts & nuts -BMS-W.62-Pg 73
G.I washers- BMS-W.65 - Sl No-925,Pg 73
Bitumen washers - BMS-W.67 - Pg 73
B. LABOUR
Carpenter II class
Man mazdoor
Sundries including 50 x 6 mm iron wind ties white lead etc.
Add for Standard specification 1mm. Thick ridging and 1.25 mm thick sheet
vallyes when such are required for a particular work. Average allowance for
10 sqm roofing.
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 sqm = Grand Total/10

11.30 Sqm
22.03 nos
22.03 nos
22.03 nos
0.43 day
0.54 day
LS
LS

14%
0%
0%
Rate per 1 Sqm

62

BLD-CSTN-12-2-(169) : Painting, Priming Coat on New Plastered Surface with Cement Primer Water base Exterior
remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and inc
complete for finished item of work.
Cement Primer Grade - II
1st class painter
2nd class painter

1.00 Kg
0.21 day
0.49 day

Sundries including brushes, ladders, etc.,


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Total cost
Rate per 10 Sqm
63

0.50%
14%
0%
0%

BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after thor
and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaf
item of work, but excluding conveyance charges of materials

Gum, conjee water, or prickly pear juice including necessary fire wood

1.20 Kg
LS

Brick Layers / Painter


Mazdoor (unskilled)

0.11 day
0.22 day

Whiting / White Cement

Sundries including brushes, ladders, etc.,


over heads & contractors profit
sub total
Add VAT @

0.50%
14%
0%

337269598.xlsx Bld data-13-14

Page 2932 of 3205


Add Labour Cess @
Total cost
Rate per 10 Sqm

0%

337269598.xlsx Bld data-13-14

Page 2933 of 3205


64

BLD-CSTN-11-5-(162) : White washing two coats with whiting of approved quality to give an even shade after thor
and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaf
item of work, but excluding conveyance charges of materials
Whiting / White Cement
Gum, conjee water, or prickly pear juice including necessary fire wood
Brick Layers / Painter
Mazdoor (unskilled)

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @
Total cost
Rate per 10 Sqm

1%
14%
0%
0%

BLD-CSTN-11-8-(164): Colour washing two coats with approved Colour and quality to give an even shade after tho
and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaf
item of work, but excluding conveyance charges of materials
Rate as per White washing Two coats
Add 50% extra for colour etc
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

66

LS
0.21 day
0.32 day

Sundries including brushes, ladders, etc.,

65

2.00 Kg

50%
14%
0%
0%

BLD-CSTN-12-3-(170) ; Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over
2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of lo
conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item
Cost of white wash one coat
Cost of Snowcem paint

1st class painter


2nd class painter
Mazdoor (unskilled)
Add sundries including brushes etc @
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

2.00 Kg
0.09 day
0.21 day
1.50 day
1%
14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2934 of 3205


67

BLD-CSTN-11-10-(167) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of app
appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the su
powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labo
work as per SS 911 for internal walls
PRIMARY COAT:
Cost of Oil bound Distemper Primer
Painter I st class
Pianter II nd class
Cost of washable Oil Bound Distemper
1st class painter
II class painter
Grand Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

68

69

0.50 Kg
0.08 day
0.19 day
1.70 Kg
0.36 day
0.84 day
14%
0%
0%

BLD-CSTN-12-12-(193): Painting Priming Coat on New Iron Work including cost and conveyance of all mate
operational and all labour charges etc., complete for finished item of work.
Red Oxide Primer - BMT-J.03

0.70 Ltr

1st Class Painter


2nd Class Painter
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

0.21 day.
0.49 day.

14%
0%
0%

BLD-CSTN-12-7-(174): Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood W
conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complet
1207 & 1212).
Synthetic Enamel paint (at 20 sqm / litre as per British Paints (I) Ltd.

0.70 Ltr

1st Class Painter


2nd Class Painter
Sundries including brushes, soap, putty etc.,
Total
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 10 Sqm

0.21 day.
0.49 day.

14%
0%
0%

DOORS , WINDOWS AND VENTILATORS


69

Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through
ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brack
locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover
of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special sp
Rate as per SSR Item No. 156,Pg 18 -BMT-F.29
over heads & contractors profit

337269598.xlsx Bld data-13-14

1.00 Sqm
14%

Page 2935 of 3205

70

sub total
Add VAT @
0%
Add Labour Cess @
0%
Rate per 1 Sqm
BMT-P.25; NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH
windows made of pre-painted steel (Base steel as per IS 513 of 0.6mm thick galvanized as per IS 277 with Zinc of 1
5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick
be of 48x50mm, centre mullion should be of 48x50mm, section for shutter should be of 47x20mm and Fixed glass b
frame and mullions to have rebate for Glazed shutter and a 20mm provision for Guard bars/Grills. The sections ar
bracket. Centre mullion is to be fixed with mullion cap. Seccolor Handle, seccolor stay, 2 nos. of Stainless Steel h
shutter. The windows should be panelled with 5mm thick plain float glass. Rubber Gaskets are provided all around th
the concrete/masonry wall by means of self expanding screws, Including 10mm Square guard bars with 6 (152.4
work.

Double shutter Window with vertical member 40 x 40 (1219.2mm x 1219.2mm) outer frame section size of 48x5
and mullion section should be of 48x50mm.
Rate as per SSR Item No. 742 Pg 62 -BMT-P.25
over heads & contractors profit

1 Sqm
14%

sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm
b

0%
0%

Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section size of 48x50
Mullion section size of 48x50mm. Fixed beading section size of 12x12mm.
Rate as per SSR Item No. 743 Pg 62 -BMT-P.26
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

71

1 Sqm
14%
0%
0%

NCL or Equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL BUILDINGS WITH GRILL & F
windows made of pre-painted steel (Base Steel as per IS 513 of 0.6mm thick galvanized as per IS 277 with zinc of 1
5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick
be of 72x55mm, centre mullion should be of 72x50mm, Section for fixed glass beading section should be of 12x
47x20mm. Outer frame & mullion sections to have rebate for glazed shutters, fly mesh and a 20mm provision fo
should be of 20x40mm. The sections are to be cut to length metre joined with corner bracket. Centre mullions ar
seccolor handles, seccolor latch 2 Nos of heavy duty stainless steel pivot hinges shall be provided per Shutter. The
plain float glass and S.S. Mesh for fly mesh shutter(304 grade). Rubber Gaskets are provided all around the gla
concrete/masonry wall by means of self expanding screws. Including 10mm Square guard bars with 6 (152.4mm) p

Centre fixed both side openable shutter window 50x40 (1524mm x1219.2mm). Outer frame section size of 72x50
Mullion section size of 72x50mm. Fixed beading section size of 12x12mm.
Rate as per SSR Item No. 748, Pg 63 -BMT-P.31
over heads & contractors profit

1 Sqm
14%

sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

0%
0%

337269598.xlsx Bld data-13-14

Page 2936 of 3205


72

NCL or Equivalent Sliding Windows Providing and Fixing Sliding Window fabricated from Roll formed sections ma
coated (Base Steel as per IS 513 D quality, galvanized as per IS 277 with zinc of 120 GM/Sq.mtr) with total coated
primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with Alkyd
pure polyester powder up to 50-60 microns thick. Section for external frame bottom should be of 79x44mm, externa
guide for top and bottom should be of 69x26mm (Stainless Steel). Section for shutter should be of 26x30mm. The
plain float glass. Corner bracket for internal and external frame made of glass filled nylon. Gaskets are to be
(EPDM).The sections are to be cut to length, joined and assembled by means of corner bracket. The above frames
by means of self expanding brackets & screws including 10mm square guard bars with 6 pitch (152.4mm) and all Ta

Rate as per SSR Item No. 750, Pg 63 -BMT-P.33


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm
73

0%
0%

BMT-N.04: Providing and fixing 30mm thick RAJSHRI or Equivalent BRAND FACTORY MADE SOLID SINGLE S
consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX1
shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm thick heat
channel of size 30mmX50mm to form stiles.5mm thick& 75mm wide single side prelim Pac sheets shall be for the
thick one side Pac sheet to be fitted in the MS. Frame and sealed to the front (prelam side) stiles and rails (which sh
and attached to the back(white/ivory) stiles and rails which should have a 10mm 900 bent portion as beading ) usi
beading inside the 90 bent beading. All stiles, rails and beadings are to be joined to the panel using solvent cem
20mm width to be stuck on the interior side of the C channel using Pac solvent cement adhesive and 10mm(5mm
fitted as gap insert for top and bottom rail etc. complete as per direction of Engineer in-Charge, manufacture specif

Rate as per SSR Item No.646, Pg 43 -BMT-N.04


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm
74

1 Sqm
14%

1 Sqm
14%
0%
0%

BMT-N.31: Doors Frames (Colour Coated Steel Sections) & Shutter using Cement Bonded Particle Board as
Providing and fixing of door frame made from cold roll formed sections made of galvanized (Base steel as per IS2
steel sections with total coated thickness of 1mm, primer coated with epoxy primer coat of 5-7 microns thick, finis
The Section for door frame is to be filled with polyurethane (P.U) form of 40kg/m3. Overall size of frame section s
corner brackets, stiffeners, hinges, and screws. Cement Bonded particle board shutter (Bison Panel or Equivalent)
of size 12m x 18m x 12mm made from 0.6 mm thick galvanized, colour coated cold rolled steel profiles with 16mm
Panel or Equivalent) with necessary screws fixed at every 1-0 (304.8mm) intervals. The cost inclusive of MS nic
200mm long tower bolt 1no., 125mm handles 2nos., cost and conveyance of all materials at site and applying one c
of synthetic enamel paint as per approved design

Rate as per SSR Item No.705, Pg 58 -BMT-N.31


over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

337269598.xlsx Bld data-13-14

1 Sqm
14%
0%
0%

Page 2937 of 3205


75

BMT-F.30: Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm cen
mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS A
65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking arrange
fixtures and painted with one coat of approved steel primer etc., complete for finished item of work as per special sp
Rate as per SSR Item No. 157, Pg 18 -BMT-F.30
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

76

1 Sqm
14%
0%
0%

BMS-W.16; Supply, delivery and fixing of 50mm thick Cement Jali of size 0.90x0.45 m for Ventilator including all labo
Cost of 50 mm thick Cement Jali -SSR Item No.892, Pg 84 - BMS-W.17
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

1 Sqm
14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2938 of 3205


77

Supplying and fixing of MS Grill for windows using 25mm x 6mm MS flat alround and 10mm MS square bars horizon
at 30cm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick m
neatly and painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bend
and all labour charges etc., complete for finished item of work.
For MS Grill

1.50 x

Quantity Anailysis
25mm x 6mm MS flat alround @ 1.20 Kg/Rmt
Vertical Flat
Horizontal Flat
Z Holdfasts

2 Nos
2 Nos
4 Nos

1.50
1.50
0.45

8.00 Rmt
10mm M.S square bars @ 0.78 kg /Rmt
Vertical bars
Horizontal bars

5 Nos
12 Nos

1.50
1.50

26.00 Rmt
Cost Analysis
Cost of 25X 6mm MS Flat
Cost of 10mm MS squre bars
Labour charges for fabricating steel and fixing in position as per SSR Item
No.BMM-V.14-824
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position- BMM-V.15-825.Pg- 68
Rate per 29.88 Kgs
Rate per 1 Sqm
Rate per 1 Kg
78

9.60 Kgs
20.28 Kgs
29.88 Kgs
29.88 Kgs

Supply and fixing of 40 mm thick polished black Kadapa stone for platform including labour charges for lifting and fix
Kadapa slab 40 mm thick and size not less than 0.457 M x 0.457 M (BMTB.01) item 22 Pg 11

1.05 Sqm

Rounding the edges of Kadapa / Shahabad stone slabs of any thickness


including polishing the same (BMM-V.09) item 860 Pg 82 (0.75 Mts wide plot
farm)

1.34 Rmt

Labour charges for lifting & fixing in position @

20%

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @

14%
0%
0%
Rate per 1 Sqm

79

Supply and fixing of 15 mm thick polished black Kadapa stone for shelves including labour charges for lifting and fix
Polished black Kadapa slabs minimum of 15 mm thick (BMT-B.06) item 26
Pg 14

1.05 Sqm

Rounding the edges of Kadapa / Shahabad stone slabs of any thickness


including polishing the same (BMM-V.09) item 860 Pg 82 (0.75 Mts wide plot
farm)

1.34 Rmt

Labour charges for lifting & fixing in position @

20%

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @

14%
0%
0%
337269598.xlsx Bld data-13-14

Page 2939 of 3205


Rate per 1 Sqm

337269598.xlsx Bld data-13-14

Page 2940 of 3205


80

BLD-CSTN-15-5-(307): Providing and fixing 1.80 metre long MS fencing posts with 6 mm bar nibs as per design in
paid for separately)
Details of cost for 10 pipes 12.5 cm long day i.e., 1.25 metres
Materials:
Galvanised mild steel tube (light grade) 40 mm nominal bore 10 x 12.5 cm =
1.25 metre with wastage of 5% (BMW-F.75)
Labour :For cutting and fixing in position
Assistant fitter
Mason.
Mazdoor (male).
Sundries
Add for water charges @ 1 %
Cost for 1.25 m
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Cost for 1.25 m
Cost per m

1.310 m

0.100 day
0.400 day
0.400 day

14%
0%
0%

Rate per 10 Sqm

81

Observed data- Supply, fabrication and fixing in position of MS Purlines including cost and conveyance of all materi
Weight of 40mm dia MS Structural Pipe- Medium class as per IS-1161
add 5% for wastage
Total weight
Cost of Mild Steel Tubes & pipes of all diameters as per IS-1161-BMT-F.04Sl No-130 and Pg 17
outer dia of 40mm dia MS pipe = 48.3mm
Painting with Synthetic enamil paint (2Pi rl)
Labour charges for fixing @ 30%
Rate per 1 Rmt

1 Rmt

3.74 Kg
r
2
6.290 0.024
0.15 Sqm

82

Observed data based on IRR-CCDW1-8 : Providing and fixing 1.50 m long cold twisted deformed steel Anchor
drilled in bed rock and remaining length embedded in concrete/ masonry including cost of all materials, machina
Anchore rod, grouting hole with thick cement slurry etc, with intial lead up to 50m and all lifts.

Unit - 10 Nos

16 mm dia

A) MATERIALS
16mm dia Steel (including 5% Wastage) 10 Nos of 1.50m length

23.70 Kg

Drilling of 20mm dia holes by Pneumatic Compressor Sl No.141 Pg No. 19

10 Nos

Grouting 20mm dia holes with neat cement slurry Sl No.144 Pg No. 19

10 Nos

B) LABOUR CHARGES
Bar Bender
Mason 2nd class
Mazdoor (unskilled)
Rate per 10 Nos
Rate per 1 Nos

0.50 day
0.50 day
1.00 day

337269598.xlsx Bld data-13-14

Page 2941 of 3205


Rate per Each

337269598.xlsx Bld data-13-14

Page 2942 of 3205


Observed Data
84

85

Observed Data : Fixing MS angular sections of size 50mm x 50mm x 6mm confirming to IS 226 and IS 808 as d
placing in position in the concrete for the purpose of fixing barbed wire fencing and painting the angles with two coa
and conveyance of all materials, labour charges etc., complete at the top of the compound wall after raising the wall
Height of the Angular pole
weight of MS angular section of 50x50x6mm

2.50 m
4.50 Kg

Labour charges for fabricating steel and fixing in position as per SSR Item
No.BMM-V.14-824 & BMM-V.15-825.Pg- 68

4.50 Kg

Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
position
Add two coats synthetic anamel painting charges
Area for 1 No., of MS angle of 1.05m length for both sides
Size of angle 50x50x6mm
Area = 1.05 x 0.112 =
Say
Total cost for each angular including fixing

4.50 Kg

Bldngs_Elec-17-4 (10) :Supply and erecting fencing of section having size 2450 mm in height from ground level
50x50x6mm erected in CC foundation 15x15x40cms deep. The section of the frame shall be fitted with flat iron s
middle and chain link jali of 8 SWG G.I to the angle iron at every distance of 30 cms by iron studs complete duly pai
of aluminium paint.
50x50x6mm Angle Iron (1 Mt. = 4.37 Kg) 4.8 m Length = ( 4.80x 4.37 ) =
20.976 Kg say 21 Kg
25x6mm M.S Flat (1 Mt. 1.18 Kg) 3.6 M length = ( 3.60 x 1.18 ) = 4.248 Kg
say 4.25 Kg
Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) as per IS:
2721-1979: 4"x4" (102 mm x 102 mm) - 8 Gauge - BMT-F.23

85

0.1176 Sqmt
0.12 Sqmt

20.97 Kg
4.25 Kg
2.40 Sqm

Fabrication of Frame with angles, Flat and chain link mesh as per SSR Item
No.BMM-V.14-824 & BMM-V.15-825.Pg- 68

25.22 Kg

C.C.Work M 15 using 20 mm metal (15 x 15 x 40) x 2 As per Civil SSR ( BLD-CSTN-3-10- ( 27 ) Hand mixing- basic cost)

0.018 Cum

Painting with one coat of red oxide and two coat of alluminium paint.

5.88 Sqm

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @
Total cost for each angular including fixing
Rate per 100 Rmt @ Angular section at every 1.20m
Rate per 1 Rmt

14%
0%
0%

BMM-V.16: Labour charges for fabricating all heavy steel works like Trusses, Stanchions, Heavy Beams and G
charges, etc excluding cost of fixing in position
Rate as per item No.867 of Pg No.62 -2011-12
1 Kg
Add Labour component @
20%
over heads & contractors profit
sub total
Add VAT @

14%
0%
337269598.xlsx Bld data-13-14

Page 2943 of 3205


Add Labour Cess @
Rate per 1 Kg

0%

337269598.xlsx Bld data-13-14

Page 2944 of 3205


86

87

BMM-V.17: Labour charges for fixing heavy iron grills, Trusses, Stanchions, Heavy Beams and Girders erecting in po
Derek pole arrangements and cranes etc., complete in position
Rate as per item No.868 of Pg No.62 -2010-11
Add Labour component @

1 Kg
20%

over heads & contractors profit


sub total
Add VAT @
Add Labour Cess @
Rate per 1 Kg

14%
0%
0%

Supply and Fixing in position of MS heavy structural steel including cost and conveyance of all material , labour ch
Complete.
Cost of Mild Steel, structural steel, i.e. Angles,channels and "I" sections
1 Kg
Transportation of material for 20.00Km lead
1 Kg
Labour charges for fabrication
1 Kg
Labour charges for fixing
1 Kg
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Kg

88

14%
0%
0%

Manufacture, Supply , Delivary and fixing of MS Door frame made with T angle of size 40x40x6 mm with 10 m
nos. 125 mm Butt hings welded to the frame and 6 Nos. MS Z hold fasts with 20x5 mm MS Flat 200 mm long, in
fabrication, welding etc., complete
Door size 3'-0"x 6'-9"
T angle for Door frame @ 3.5 Kg/Rmt
6 nos.MS hold fasts with 20x5 mm Flat
weight of 10 sq mm tie rods 2 Nos

0.90
2.05
5.90 Rmt @
1.38 Rmt @
1.80 Rmt @

Cost of T angle & 10 mm Sq. rod for Door Frame


cost of 3 Nos. 125 mm long butt hinges( Sl No.185)
Labour charges for farication works
Labour charges for fixing works

89

23.13
3
23.13
23.13

Supply and fixing of 30 mm thick Flush Door shutter solid bond wood block board type with commercia
Aldrop, 2 nos. 125 mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch 1 No. doo
including c/c of all materials and labour chrges etc., complete
Door size : 3'- 0" X 6-9"
Shutter size for the T angle door frame
cost of flush door shutter 30 mm thick (SSR No.658) - BMT-N.16
Aldrop of 300 mm long (BSSR.Sl. No.203) - BMT-G.45
Door handle of 125 mm long (BSSR Sl. No.191) - BMT-G.35
Tower bolt of 150 mm long (BSSR Sl.No.166) -BMT-G.08
Door latch of 250 mm long (BSSR Sl No.207) - BMT-G.49
Labour charges for door shutter

337269598.xlsx Bld data-13-14

0.90

2.05

1.845
1.00
2.00
1.00
1.00
1.845

Sqmt
No.
No.
No.
No.
Sqmt

Page 2945 of 3205


90

Supply and fixing of Steel Glazed Window with double openable on both sides centrally fixed post and MS Wind
with other fittings and their fixtures including supplying and fixing of 10 mm square bars @ 10cm c/c as per app
materials and labour charges including 4mm thick pin headed glass and approved fixtures like MS Z shaped h
finishing item of work complete as directed by the department .

MS Window Section - E Z 7
for Outer Frame:
Horizantals
verticals
holdfasts

H
1.20

V
1.20

2 Nos
2 Nos
4 Nos

1.20
1.20
0.20

Inner frame for shutters:


Horizantals
verticals

4 Nos
4 Nos

0.60
1.20
Total

c
d
e

FRB section
for central (Mullion) MS Tee 30 x 30 x 3
10 sq. mm saftety rods @ 100mm C/C
4 mm thick Pin headed Glass

Weight of " Z " Angles -T1 =1.03 Kgs/m (steel India )

12.80 Rmt

b
c

MS Tee for Central Mullian -235x25x3 @ 1.15 Kg/Rmt


10 sq. mm saftety rods @ 0.78 Kg/Rmt
ABSTRACT
cost of Mild steel and structural steel
10mm Sq. Bars
window shutter lock handle with hinges 100mm (192) - BMT-G.35
Cost of 4 mm thick Pin headed Glass - BMT-I.13- (SSR No.344)
Labour charges for fixing of glass & cost of putty
Labour charges for fabricating steel works like Windows excluding cost of
fixing
in charges
position for fixing Iron Doors, Iron Windows and Window Grills in
Labour
position

1.20 Rmt
14.40 Rmt

a
b
c
d
e
f
g

91

1 Nos
12 Nos
1.20

1.20
1.20
1.20

14.60 Kg
11.20 Kg
2 No.
1.44 1.44
1.44 sqmt
25.80 Kg
25.80 Kg

Supply & Fixing of MS "L" Angle 25X25X3 mm door frames (W.C.) with 2 Nos. of 125mm long hinges an
bonded particle boards confirming to IS 14276 truly exterior grade (Bison panel or equivalent ) including cost and co
etc., complete for Bathroom doors as directed by the Engineer-in-charge.
"L" Angle WC Door Size .
"L" Angle for Door frame .
6 nos.MS hold fasts with 20x5 mm Flat
"L" Angle for Hold fast 4 Nos of 0.23m
Weight of 'L' for Door Frame @1.10Kg/ Rmt
Cost of 'L' Angle Door Frame with hold fasts
Labour charges for Fabrication Works (140)
Labour charges for Fixing (141)
Shutter Size 2'-6" X 6'-0"
Cost of plain cement bonded particle boards confirming to IS 14276 truly
exterior grade (Bison Panel or equivalent) SSR No. 491 - BMT-K.88
Cost of 2 Nos. Hinges 125 mm long (186) - BMT-G.29
Tower bolt of 150 mm long (BSSR Sl.No.172) -BMT-G.15
Labour Charges for fixing Door including cost of screws and transportation
etc.

337269598.xlsx Bld data-13-14

0.75
5.60
1.38
0.92
7.90
7.90
8.69
8.69
8.69

2.05
1.20 Rmt@
Rmt
Rmt
Kg
Kg
Kg

1.5375

Sqm

2.00
2.00
1.54

Nos
Nos
Sqm

Page 2946 of 3205

337269598.xlsx Bld data-13-14

Page 2947 of 3205


92

BMW-G.01: Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer a
suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & b
Basic rate as per S.No.335 of Pg.No.99 - BMW-G.01
BMW-G.02-labour charges @
Total
Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @

1.00 Lit
40%

0%
0%
Rate per 1 Lit

93

Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal ang
MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing w
duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red
of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational char
finished item of work.
For MS Gate
Quantity Anailysis
45 x 45 x 6mm MS equal angle alround @ 4.00 Kg/Rmt
Vertical Angle (1.50+2.0)
Horizontal Angle
Z Holdfasts

1.75 x

2 Nos
2 Nos
4 Nos

1.75
1.50
0.45

9.00 Rmt
2 Nos
1.50
3.00 Rmt

35x35x5mm MS equal Horizontal Angle@2.60Kg/Rmt


Total Angles Qty

12mm M.S square bars @ 1.13 kg /Rmt


Vertical bars

Total Square Bars Qty


MS Sheet of 2.00mm (14G) for Bottom portion @ 15.70 Kg/ 1 Sqm

337269598.xlsx Bld data-13-14

12 Nos

1.75

21.00 Rmt
1.50
0.45 Sqm

0.30

Page 2948 of 3205


Cost Analysis
Cost of Equal angles
Cost of 12mm MS squre bars
Cost of MS sheet
Labour charges for fabricating steel and fixing in position as per SSR Item
No.BMM-V.14-824
Labour charges for fixing Iron Doors, Iron Windows and Window Grills in
positionBMM-V.15-825.PgPainting with
Synthetic enamil68
paint
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 300 mm Long -BMT-G18
MS-Powder Coated Aldrop (IS:2681) 300 mm long -BMT-G.45
Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @

43.80 Kgs
23.73 Kgs
7.07 Kgs
74.60 Kgs
74.60 Kgs
2.63 Sqm
1 No
1 No

0%
0%
Rate per2.625 Sqm
Rate per 1 Sqm
Rate per 74.595 Kg
Rate per 1 Kg

94

Supply and Fixing in position of steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows etc, in
labour charges for fabrication and fixing in postion etc,. Complete.
1 Kg
Cost of Mild Steel, structural steel, i.e. Angles,channels and "I" sections
Transportation of material for 20.00Km lead
Labour charges for fabrication
Labour charges for fixing
over heads & contractors profit
sub total
Add VAT @
Add Labour Cess @
Rate per 1 Kg

95

96

1 Kg
1 Kg
1 Kg
14%
0%
0%

Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, cl
soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, incidental, labou
bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diamete
Item No.20 of Pg.400, Amendment to Building standard data -2011-12
up to 300 mm dia
Total cost for 1 RM
A. MATERIALS :
Nil
B. LABOUR
Mazdoor
C) Labour Allowance
D) Overheads and Contractor's Profit @ 14%
sub total
Add VAT @
Add Labour Cess @
Total per 1 Rmt

0.526 day
20%

0%
0%

Augoring and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, cl
soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, incidental, labou
bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diamete
Item No.20 of Pg.400, Amendment to Building standard data -2011-12
up to 350 to 450 mm dia
Total cost for 1 RM
337269598.xlsx Bld data-13-14

Page 2949 of 3205


A. MATERIALS :
Nil
B. LABOUR
Mazdoor
C) Labour Allowance
D) Overheads and Contractor's Profit @ 14%
sub total
Add VAT @
Add Labour Cess @

0.631 day
20%

0%
0%
Total per 1 Rmt

97

Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cot
boring equipment in site as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour ch
drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters.

up to 300 mm dia - DOUBLE UNDER REAMING


Total cost for 1 Bulb Each
A. MATERIALS :
Nil
B. LABOUR
Mazdoor
C) Labour Allowance
D) Overheads and Contractor's Profit
sub total
Add VAT @
Add Labour Cess @

0.56
20%

Day

0%
0%
Total per 1 Rmt

350 mm dia 450 mm dia - DOUBLE UNDER REAMING


Total cost for 1 Bulb Each
A. MATERIALS :
Nil
B. LABOUR
Mazdoor
C) Labour Allowance
D) Overheads and Contractor's Profit
sub total
Add VAT @
Add Labour Cess @

0.789
20%

Day

0%
0%
Total per 1 Rmt

500 mm dia to 700 mm dia - DOUBLE UNDER REAMING


Total cost for 1 Bulb Each
A. MATERIALS :
Nil
B. LABOUR
Mazdoor
C) Labour Allowance
D) Overheads and Contractor's Profit
sub total
Add VAT @
Add Labour Cess @

0.986
20%

Day

0%
0%
Total per 1 Rmt

98

Supply, delivery and fixing of 110mm dia PVC vent pipe including vent cowl, cost of material and labour charges e
15m height above GL
Cost of 110mm dia PVC Pipe.of 3.00 Mts length BSSR Item No.347,Pg-99 BMW-G.13
337269598.xlsx Bld data-13-14

1 No

Page 2950 of 3205


Rate for 15 Rmt PVC pipe
Rate for vent cowl SSR item 434,Pg-102 - BMW-G.100
PVC Pipe clip SSR item 440 Pg-102 - BMW-G.106
Labour charges for laying, fixing and commissioning the PVC pipes
including couplers/ bends/ tees etc any diameter including fixing necessary
fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing
as per standard practice, as per item No.486 of Pg,104-BMW-G.152

Add Labour component @


Rate for 15 Rmt PVC pipe
Rate for 1 Rmt
Overheads & Contractors Profit
sub total
Add VAT @
Add Labour Cess @

15 Rmt
1 No
10 No
15 Rmt

20%

0%
0%
Total per 1 Rmt

99

RBR-CCPV-13 - i : Providing and Laying of Interlocking Concrete Block Pavements using PHOENIX or equivalen
Regular Pavers of 80 mm thickness of M- 30 Grade of which top 12 mm thick shall be for colour pigmentation wi
required reflective glazing inclusive of all taxes - as per drawing and Technical Specification Clause 1504 MORD
Unit = sqm
Taking output = 225 sqm
a)Labour
Mate
Mazdoor (Unskilled)
Mason (2nd class)
b) Machinery
Water tanker 6 kl capacity
c) Material
Supply of PHOENIX or equivalent - BMT-D.10, Sl.No.100 of Pg.No.16
(ii) Edge blocks 60 mx2
(iii) Sand as per Table 1500.5
Bed = 603x75x 0.03 = 6.75 cum
Joints = 60x0.08
= 0.48 cum
(iv) Water for wetting of bedding sand
d&e) Overheads & Contractors Profit
Sub Total
Add VAT @
Add Labour Cess @
Cost for 225 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/225

- day
18.00 day
8.00 day
2.00 hour
225.00 sqm
120.00 m
7.23 cum

3.00 kl
14%
0%
0%

2. Edge blocks may be cast-in-situ. Brick masonry toe wall or CC block 300 mm x 300 mm x 150 mm or any other s
analysed/included accordingly
Cost of CC 1:2:4 as per Bld. Data, without CP
size of Edge Block 500 mm x 300 mm x 150 mm
Qty of each block of1.00 m length
Overheads & Contractors Profit
Sub Total
Add VAT @
Add Labour Cess @
Rate for 1 Rmt

337269598.xlsx Bld data-13-14

1 Cum
0.045 Cum
14%
0%
0%

Page 2951 of 3205


100

BLD-CSTN-9-21 - (119) : Providing skirting to internal walls to 15 cm height/risers of steps with 8 mm thick mirror
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the ra
cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, ceme
seigniorage charges, etc., complete for finished item of work
Unit = 10 sqm
A. MATERIALS:
8 mm thick mirror polished granite tiles
Sand for cm 1:3 base coat
Cement for cm 1:3 base coat
Cement for slurry
White cement for jointing & pointing
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskilled)
Add water charges 1%
Grand Total
over heads & contractors profit

10.50 sqm
0.12 cum
57.60 kgs
33.00 kgs
5.00 kgs
2.10 day
0.80 day
4.90 day
1.00%
14%
Sub Total

Add VAT @
Add Labour Cess @
Total cost for 10 sqm
Rate per 10 Sqm

0%
0%

337269598.xlsx Bld data-13-14

Page 2952 of 3205


101

BLD-CSTN-9-20 - (118) : Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length e
CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointe
of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete incl
finished item of work,
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles polished 1st quality
Sand for cm 1:5 base coat
Cement for cm 1:5 base coat
Cement for slurry
White cement for jointing & pointing
B. LABOUR
Mason Ist class
Mason 2nd class
Mazdoor (unskilled)
Add water charges 1%
Grand Total
over heads & contractors profit

10.50 sqm
0.12 cum
34.56 kgs
33.00 kgs
2.00 kgs
0.96 day
2.24 day
3.30 day
1.00%
14%
Sub Total

Add VAT @
Add Labour Cess @
Total cost for 10 sqm
Rate per 10 Sqm
102

0%
0%

BMT-N.58 : Providing and fixing door frames fabricated from sections made of galvanized steel powder coated (ba
277 with zinc of 120 grams / square metre), the factory made section are powder coated with pure polyester pow
thickness of 1.25 mm, size of door frame section is of 105 x 60 mm with a rebate of 38 mm to accommodate 35
gasket in the frame section, frame section filled with polyurethane foam, cut to length, and joined by way of welding
powder coated butt hinges of 100 mm long 3 Nos. for single shutter, 6 Nos. for double shutter. b) CRCA electropla
40 mm x 200 mm x 1.2 mm hold fasts screwed to stiffeners 6 Nos. with split end tail. d) Nylon Aldrop Receiver
No

Rate as per SSR Item No.714, Pg 59 -BMT-N.58


over heads & contractors profit

1 Rmt
14%
Sub Total

Add VAT @
Add Labour Cess @
Total

0%
0%
Rate per 1 Sqm

103

NCL or equivalent PRE- PAINTED STEEL, WINDOWS, VENTILATORS & DOOR FRAMES. Supply and fixing
ventilators made of pre - painted steel (base steel as per IS 513 of -0.6 mm thick 'D" quality, galvanized as per IS 2
epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated wi
outer frame should be 46 x 52 mm section for shutter should be 46 x 46 mm section for mullion should be 46 x 70 m
mm and section for louvered ventilation should be 33 x57mm Box section. The windows should be panelled with
glass for ventilators with Ethyl propylene Diamine monomer Gasket (EPDM). The sections are to be cut to length m
are to be fixed using mullion cap. Handle made of high grade aluminium powder coated and nylon receiver. Gasket
(EPDM). Corner brackets made of CRCA with Zinc Phosphate. Mullion caps made of glass filled nylon. The ab
/masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete for finis

Windows: Centre fixed both side openable shutter


5'-0" x 4'-0"
(1524x1219.2mm) outer frame section size of 46 x 52 mm shutter frame
section size of 46 x 46 mm Mullion section size of 46 x 70 mm fixed beading
section size of 18 x 25 mm - BMT-P.14 - S.N.746 - Pg- 67
over heads & contractors profit

1 Sqm

14%
337269598.xlsx Bld data-13-14

Page 2953 of 3205


Sub Total
Add VAT @
Add Labour Cess @
Rate per 1 Sqm

0%
0%

337269598.xlsx Bld data-13-14

Page 2954 of 3205


104

BMT-N.30: upply and fixing of BISON LAM double door shutter using 16MM BISONLAM with all round U sectio
0.6mm thick galvanized pre-painted cold rolled steel profiles with BISON LAM separating two shutter with 30mm x 2
screws fixed at every 10 (304.8mm) intervals. The cost inclusive of MS Nickel coated 250mm long aldrops 2nos, M
nos M.S.P.C. Door stopper. Including cost and conveyance of all materials at site labour charges etc., complete finis

Rate as per SSR Item No.686, Pg 53 -BMT-N.30


over heads & contractors profit

1 Sqm
14%
Sub Total

Add VAT @
Add Labour Cess @
Rate per 1 Sqm
105

0%
0%

Designing, providing and fixing Structural Glazing fabricated from Roll formed sections made of Pre-painted Steel
D quality, galvanized as per IS 277 with Zinc of 120 Gm/Sqm) with total coated thickness of 0.72 mm and the glass
steel of 0.58 mm thick galvanised steel section as stiffeners inside the colour coated steel powder coate
calculations to suit wind pressures as given in IS: 875, the primer coat with epoxy primer of 5 7 microns thick,
microns thick and back coated with Alkyd backer of 5-7 microns or powder coated with pure polyester powder up to
50 mm x 100 mm x 0.72 mm, 33 mm x 58 mm x 0.72 mm for frame horizontal section, stiffener section of 48 mm x
mm x 58 mm x 0.58 mm, glass holding section of 37 mm x 37 mm & 37 mm x 18 mm including fixing 5mm thick O
CRCA powder coated/Electroplated to connect vertical to horizontal, vertical to slab, to fix verticals at top & bottom
Ethyl Propylene Diamine Monomer, U.V. resistant silicon sealant including fixing in concrete/masonry wall with selfconveyance of all materials to site, all labour charges, incidental charges, cost of all consumables etc. and sca
finished item of work.

Rate as per SSR Item No.881,-BMT-Q.01


over heads & contractors profit

1 Sqm
14%
Sub Total

Add VAT @
Add Labour Cess @
Rate per 1 Sqm
106

0%
0%

Supply and fixing of precast RCC Door Frame of size(0.98X1.98mt) using flush type Door with 30mm thick flush s
faced on both the sides with Commercial type plywood including cost of necessary fittings like hinges, tower bo
charges completed for finished item of work as directed by Engineering Incharges.
R.C.C.Door
R.C.C.Door Frame (0.98X1.98) As per Nirmithi Kendra Specifications
Flush door shutters, solid bond wood block board type with commercial ply
on both faces.: 30 mm thick conforming to IS:2202-t BMT.N.16
MS Powder Coated Hinges125mm (MS) BMT.G.29
30mm Screws No.8 Ele.1.4.36
Aluminium Tower Bolts size 150 mm long BMT.G.08
12mm Screws No.8 Ele.1.4.34
Aluminium Door Handile 150mm long BMT.G.34
12mm Screws No.8 Ele.1.4.34
Aluminium All Drops 300 mm long BMT-G.42
50mm dia 5cm Bolt and Nuts with washers for alldrop.Ele.8.1.12
Sal Wooden Pieces size 6"x2"X1.25"- 4 Nos. BMT-E..15
4"x0.25 Nut and Bolts with washers .Ele.8.1.64
Labour charges

337269598.xlsx Bld data-13-14

0.98m

1.98m
1.00 Nos.
1.488 Sqmt
2.00 Nos.
16.00 Nos.
2.00 Nos.
16.00 Nos.
1.00 Nos.
4.00 Nos.
1.00 Nos.
6.00 Nos.

0.0009 Cum
8.00 Nos.

Page 2955 of 3205


Labour charges for fixing flush door shutters of any thickness to the existing
door frame including fixing the fixtures to the door shutter excluding cost of
shutter BMM-V.23

1.49 Sqmt

Add LA on labour charges

20%

over heads & contractors profit


Sub-Total
Add VAT @
Add Labour Cess @
Rate per Each

14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2956 of 3205


107

Supply and fixing of Precast RCC Door Frame of size(0.75X1.98mt) using flush type Door with 30mm thick flush s
faced on both the sides with Commercial type plywood including cost of necessary fittings like hinges, tower bo
charges completed for finished item of work as directed by Engineering Incharges.
Material
R.C.C.Door Frame (0.75X1.98) as per Nirmithi Kendra Specifications
Flush door shutters, solid bond wood block board type with commercial ply
on both faces.: 30 mm thick conforming to IS:2202-t BMT.N.16
MS Powder Coated Hinges125mm (MS) BMT.G.29
30mm Screws No.8 Ele.1.4.36
Aluminium Tower Bolts size 150 mm long BMT.G.08
12mm Screws No.8 Ele.1.4.34
Aluminium Door Handile 150mm long BMT.G.34
12mm Screws No.8 Ele.1.4.34
Aluminium All Drops 200 mm long BMT-G.40
50mm dia 5cm Bolt and Nuts with washers for alldrop.Ele.8.1.12
Sal Wooden Pieces size 6"x2"X1.25"- 4 Nos. BMT-E..15

1 Nos.
1.20 Sqmt
2 Nos.
16 Nos.
1 Nos.
8 Nos.
2 Nos.
8 Nos.
1 Nos.
6 Nos.
0.0007 Cum
6 Nos.

4"x0.25 Nut and Bolts with washers .Ele.8.1.64


Labour charges
Labour charges for fixing flush door shutters of any thickness to the existing
door frame including fixing the fixtures to the door shutter excluding cost of
shutter BMM-V.23

1.20 Sqmt

Add LA on labour charges

20%

Add Over heads & contr. profit


Sub-Total
Add VAT @
Add Labour Cess @
Rate per Each

14%
0%
0%

337269598.xlsx Bld data-13-14

Page 2957 of 3205

CORPORATION
SR
3)

s and with an initial lead of 10m including all operational, incidental,


of work including seigniorage excluding dewatering charges etc as
Cum
448.00
280.00

1 day
1 day.

Rs

0.00
1019.20
203.84
1223.04
764.40
1987.44
270.59
2258.03
225.8
0.00
0.00
225.80

s and with an initial lead of 10m including all operational, incidental,


of work including seigniorage excluding dewatering charges etc as
Cum
448.00
392.00
2754.50

1 day.
1 day.

0.00
3261.44

1 hours

16527.00

Rs

19788.44
2694.2
22482.64
0.00
0.00
22482.64
93.68
93.68

s and with an initial lead of 10m including all operational, incidental,


of work including seigniorage excluding dewatering charges etc as
Cum

280.00

1 day.
1 day.

0.00
1456.00
291.20
1747.20
1092.00
2839.20
386.56
337269598.xlsx Bld data-13-14

Page 2958 of 3205

Rs

3225.76
322.58
0.00
0.00
322.58

337269598.xlsx Bld data-13-14

Page 2959 of 3205

fts and with an initial lead of 10m including all operational, incidental,
of work including seigniorage excluding dewatering charges etc as
Cum
448.00
392.00
2754.50

1 day.
1 day.

0.00
2446.08

1 hours

16527.00

Rs

18973.08
2583.18
21556.26
119.76
0.00
0.00
119.76

fts and with an initial lead of 10m including all operational, incidental,
of work including seigniorage excluding dewatering charges etc as
Cum
448.00
560.00
560.00
392.00
1083.20

73.00
1205.00

1 day.
1 day.
1 day.
1 day.

0.00
280.00
140.00
3273.20

1 hours

1083.20

1 Kg
100 Nos.

255.50
168.70

Rs

5200.60
708.06
5908.66
590.87
0.00
0.00
590.87

fts and with an initial lead of 10m including all operational, incidental,
of work including seigniorage excluding dewatering charges etc as
Cum
448.00
392.00

1 day
1 day

0.00
2038.40

1083.20

1 hour

6499.20

8537.60
1162.39
9699.99
337269598.xlsx Bld data-13-14

Page 2960 of 3205


970.00
0.00
0.00
970.00

337269598.xlsx Bld data-13-14

Page 2961 of 3205

as per drawing and technical specifications including setting out,


d disposal upto a lead of 50 m, dressing of sides and bottom and
ORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man

1 of MORT&H
Cum
448.00
392.00

1 Each
1 Each

Rs

0.00
1426.88
1426.88
199.76
1626.64
162.66
0.00
0.00
162.66

rs including breaking rock, loading in tippers and disposal with initial


h requirements of lines, grades and cross- sections as per Technical

Cum

448.00
392.00

1 day
1 day

0.00
4076.80

2754.50

1 hour

16527.00

877.30
188.00

1 hour
1 cum

5702.45
-3384.00

22922.25
3209.12
26131.37
2.00
0.00
26133.37
725.93
725.93
initial lead in layers not exceeding 15 cm thick, consolidating each
e and all operational, incidental, labour charges, hire charges of T &

Cum
627.11

1 Cum

3762.66

448.00
392.00

1 day
1 day

0.00
121.52
3884.18
528.83
4413.01
0.00
337269598.xlsx Bld data-13-14

Page 2962 of 3205


0.00
4413.01
735.50
735.50

337269598.xlsx Bld data-13-14

Page 2963 of 3205

h initial lead in layers not exceeding 15 cm thick, consolidating each


e and all operational, incidental, labour charges, hire charges of T &

Cum
446.32

1 Cum

2677.92

448.00
392.00

1 day
1 day

0.00
121.52
2799.44
381.14
3180.58
0.00
0.00
3180.58
530.10
530.10

es, sides of foundations and basement with initial lead in layers not
ding cost and conveyance of water to work site and all operational,
SS NO. 309 & 310)
Cum
448.00
392.00

1 day
1 day

0.00
121.52
16.54
138.06
0.00
0.00
138.06
23.01
23.01

mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using


materials like cement, sand, coarse aggregate water etc., to site ,
ng in 15 cm layers, finishing top surface to the required level curing

Err:520
1156.84
727.11
100.00

1 Kg
1 Cum
1 Cum
1 Kl

891.00
1041.16
327.20
120.00

490.00
392.00

1 day
1 day

49.00
925.12
3353.48
456.58
3810.06
0.00
0.00
3810.06
3810.06

Rs

Rs

337269598.xlsx Bld data-13-14

Page 2964 of 3205

337269598.xlsx Bld data-13-14

Page 2965 of 3205

concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse


veyance of all materials like cement, sand, coarse aggregate water
crete , ramming in 15 cm layers, finishing top surface to the required

Err:520
1156.84
727.11
100.00
303.10

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

891.00
1041.16
327.20
120.00
303.10

490.00
392.00

1 day
1 day

49.00
544.88
3276.34
446.07
3722.41
0.00
0.00
3722.41

Rs

Rs

mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using


materials like cement, sand, coarse aggregate water etc., to site ,
ng in 15 cm layers, finishing top surface to the required level curing

5.50
1156.84
727.11
100.00

1 Kg
1 Cum
1 Cum
1 Kl

712.80
1041.16
327.20
120.00

490.00
392.00

1 day
1 day

49.00
925.12
3175.28
432.31
3607.59
0.00
0.00
3607.59
3607.59

Rs

Rs

337269598.xlsx Bld data-13-14

Page 2966 of 3205

concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse


veyance of all materials like cement, sand, coarse aggregate water
crete , ramming in 15 cm layers, finishing top surface to the required

Err:520
1156.84
727.11
100.00
303.10

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

712.80
1041.16
327.20
120.00
303.10

490.00
392.00

1 day
1 day

49.00
544.88
3098.14
421.81
3519.95
0.00
0.00
3519.95
3519.95

Rs

Rs

mix (1:6:10) prop (Cement : fine aggregate: coarse aggregate ) using


materials like cement, sand, coarse aggregate water etc., to site ,
ng in 15 cm layers, finishing top surface to the required level curing

5.50
1156.84
727.11
100.00

1 Kg
1 Cum
1 Cum
1 Kl

712.80
1041.16
392.64
120.00

490.00
392.00

1 day
1 day

49.00
925.12
3240.72
441.22
3681.94
0.00
0.00
3681.94
3681.94

Rs

Rs

concrete nominal mix (1:6:10) prop (Cement : fine aggregate: coarse


veyance of all materials like cement, sand, coarse aggregate water
crete , ramming in 15 cm layers, finishing top surface to the required

5.50
1156.84
727.11
100.00

1 Kg
1 Cum
1 Cum
1 Kl

712.80
1041.16
392.64
120.00

303.10

1 hour

303.10

337269598.xlsx Bld data-13-14

Page 2967 of 3205


490.00
392.00

1 day
1 day
Rs

Rs

49.00
544.88
3163.58
430.72
3594.30
0.00
0.00
3594.30
3594.30

337269598.xlsx Bld data-13-14

Page 2968 of 3205

ement : fine aggregate: coarse aggregate ) using 20mm size Hard


and, coarse aggregate water etc., to site , seigniorage charges on all
g top surface to the required level curing etc., complete for finished

5.50
1501.84
727.11
100.00

1 Kg
1 Cum
1 Cum
1 Kl

1210.00
1351.66
327.20
120.00

490.00
392.00

1 day
1 day

49.00
925.12
3982.98
542.28
4525.26
0.00
0.00
4525.26
4525.26

Rs

Rs

te nominal mix m-20 (Cement : fine aggregate: coarse aggregate )


ce of all materials like cement, sand, coarse aggregate water etc., to
ramming in 15 cm layers, finishing top surface to the required level

5.50
1501.84
727.11
100.00
303.10

1 Kg
1 Cum
1 Cum
1 Kl
1 hour

1815.00
1351.66
327.20
120.00
303.10

490.00
392.00

1 day
1 day

49.00
544.88
4510.84
614.15
5124.99
0.00
0.00
5124.99
5124.99

Rs

Rs

: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm


y including cost and conveyance of all materials like cement, fine
les & other taxes on all materials including all operational, incidental
ing cost of steel and its fabrication charges for finished item of work,

1501.84

1 Cum

1351.66

337269598.xlsx Bld data-13-14

Page 2969 of 3205


727.11
Err:520
490.00
448.00
392.00
303.10
152.20
100.00

1 Cum
1 Kg
1 day.
1 day.
1 day.
1 hour
1 hour
1 Kl
Rs

327.20
Err:520
65.17
119.62
1411.20
303.10
152.20
120.00
6050.15

337269598.xlsx Bld data-13-14

Page 2970 of 3205


6050.15
137.00
415.00

6050.15
109.00
660.00

6050.15
1158.00
1000.00

1 Cum
1 Cum
1 Cum

Rs

6050.15
137.00
415.00
83.00
6685.15
910.18
7595.33
0.00
0.00
7595.33

Rs

6050.15
109.00
660.00
132.00
6951.15
946.4
7897.55
0.00
0.00
7897.55

Rs

6050.15
1158.00
1000.00
200.00
8408.15
1144.77
9552.92
0.00
0.00
9552.92

1 Cum
1 Cum
1 Cum

1 Cum
1 Cum
1 Cum

337269598.xlsx Bld data-13-14

Page 2971 of 3205

: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm


y including cost and conveyance of all materials like cement, fine
les & other taxes on all materials including all operational, incidental
ing cost of steel and its fabrication charges for finished item of work,
LS IN BUILDINGS - WOODEN SCAFFOLDING

1501.84
727.11
5.50

1 cum
1 cum
1 Kgs

1351.66
327.20
2200.00
3878.86

490.00
448.00
392.00

1 day
1 day
1 day

81.83
74.82
1842.40
1999.05

303.10
152.20
100.00

1 hour
1 hour
1 kl

303.10
152.20
120.00
575.30
6453.21
878.6
7331.81
0.00
0
7331.81
7331.81

Rs

6453.21
205.00
1171.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
6453.21
205.00
1405.00
281.00
234.20

4F
6453.21
205.00
1522.00
304.40
351.30

6453.21
205.00
1171.00
234.20
8063.41
1097.83
9161.24
0.00
0.00
9161.24

5F
6453.21
205.00
1639.00
327.80
468.40

599.715

337269598.xlsx Bld data-13-14

Page 2972 of 3205

9178.13
1249.60
10427.73
0.00
0.00
10427.73

844.43
9680.34
1317.98
10998.32
0.00
0.00
10998.32

914.80
10008.21
1362.62
11370.83
0.00
0.00
11370.83

337269598.xlsx Bld data-13-14

Page 2973 of 3205


6453.21

1 Cum

6453.21

533.00
2369.00

1 Cum
1 Cum

533.00
2369.00
473.80
9829.01
1338.22
11167.23
0.00
0.00
11167.23

Rs

Rs

6453.21
680.00
834.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
6453.21

4F
6453.21

5F
6453.21

680.00

680.00

680.00

1001.00

1084.00

1168.00

200.20

216.80

233.60

166.80

250.20

333.60

844.43
9528.64
1297.32
10825.96
0.00
0.00
10826.00

914.80
9783.21
1331.98
11115.19
0.00
0.00
11115.20

6453.21
680.00
834.00
166.80
8134.01
1107.45
9241.46
0.00
0.00
9241.46

599.715

9100.93
1239.09
10340.02
0.00
0.00
10340.05

6453.21
348.00
426.00

1 Cum
1 Cum
1 Cum
Rs

6453.21
348.00
426.00
85.20
7312.41
995.58
337269598.xlsx Bld data-13-14

Page 2974 of 3205

Rs

8307.99
913.88
0.00
9221.87

: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm


y including cost and conveyance of all materials like cement, fine
les & other taxes on all materials including all operational, incidental
ing cost of steel and its fabrication charges for finished item of work,

1501.84
727.11
5.50

1 cum
1 cum
1 Kgs

1351.66
327.20
2200.00
3878.86

490.00
448.00
392.00

1 day
1 day
1 day

32.83
59.58
980.00
1072.41

303.10

1 hour

80.93

152.20
100.00

1 hour
1 kl

40.64
120.00
241.57
5192.84
707.01
5899.85
0
0
5899.85
5899.85

Rs
Thick

0.12 m
5192.84
136.00
111.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5192.84
1183.20
965.70
193.14
7534.88
1025.87
8560.75
0
0
8560.75
8560.75

337269598.xlsx Bld data-13-14

Page 2975 of 3205


3F
5192.84
1183.20
1157.10
231.42
193.14

4F
5192.84
1183.20
1252.80
250.56
289.71

5F
5192.84
1183.20
1348.50
269.70
386.28

169.14
8338.25
1135.25
9473.50
0.00
0.00
9473.50

183.23
8563.75
1165.95
9729.70
0.00
0.00
9729.70

321.72

8279.42
1127.24
9406.66
0.00
0.00
9406.70
Thick

0.35 m
5192.84
136.00
111.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5192.84
388.96
380.38
76.08
63.49

4F
5192.84
388.96
411.84
82.37
95.24

5F
5192.84
388.96
443.30
88.66
126.98

169.14
6340.39
863.24
7203.63
0.00

183.23
6423.97
874.62
7298.59
0.00

5192.84
388.96
317.46
63.49
5962.75
811.83
6774.58
0
0
6774.58
6774.60

321.72

6423.47
874.56
7298.03
0.00

337269598.xlsx Bld data-13-14

Page 2976 of 3205


0.00
7298.05

0.00
7203.65

0.00
7298.60

337269598.xlsx Bld data-13-14

Page 2977 of 3205


Thick

0.15 m
5192.84
136.00
111.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5192.84
907.12
887.11
177.42
148.07

4F
5192.84
907.12
960.48
192.10
222.11

5F
5192.84
907.12
1033.85
206.77
296.15

169.14
7643.79
1040.70
8684.49
0.00
0.00
8684.50

183.23
7819.96
1064.69
8884.65
0.00
0.00
8884.65

5192.84
907.12
740.37
148.07
6988.40
951.47
7939.87
0
0
7939.87
7939.90

321.72

7634.29
1039.41
8673.70
0.00
0.00
8673.70

337269598.xlsx Bld data-13-14

Page 2978 of 3205

5192.84
1201.00
982.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
5192.84
1201.00
1178.00
235.60
196.40

4F
5192.84
1201.00
1277.00
255.40
294.60

5F
5192.84
1201.00
1375.00
275.00
392.80

8325.56
1133.52
9459.08

169.14
8389.98
1142.30
9532.28

183.23
8619.87
1173.60
9793.47

0.00
0.00
9459.10

0.00
0.00
9532.30

0.00
0.00
9793.50

5192.84
1201.00
982.00
196.40
7572.24
1030.96
8603.20
0
0
8603.20
8603.20

321.72

5192.84
134.00
128.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

324.55
134.00
128.00
25.60
612.15
83.34
695.49
0
0
695.49
695.50

337269598.xlsx Bld data-13-14

Page 2979 of 3205


3F
324.55
134.00
154.00
30.80
25.60

4F
324.55
134.00
166.00
33.20
38.40

5F
324.55
134.00
179.00
35.80
51.20

169.14

183.23

865.29
117.81
983.10
0.00
0.00
983.10

907.78
123.59
1031.37
0.00
0.00
1031.40

321.72

990.67
134.88
1125.55
0.00
0.00
1125.55

nding to IS 456 using WEIGH BATCHER / MIXER with 20mm size


ing cost and conveyance of all materials like cement, fine aggregate
taxes on all materials including all operational, incidental and labour
excluding cost of steel and its fabrication charges for finished item of
NTH, PEDESTALS ( using Concrete mixer)

1501.84
727.11
5.50
490.00
448.00
392.00
303.10

1 Cum
1 Cum
1
1 day.
1 day.
1 day.
1 hour

152.20
100.00

1 hour
1 Kl

Kg

Rs

6297.21
137.00
415.00

1 Cum
1 Cum
1 Cum

1201.47
290.84
2090.00
65.17
119.62
1803.20
404.03
202.88
120.00
6297.21

6297.21
137.00
415.00
83.00
6932.21
943.82
7876.03
0.00
0.00
337269598.xlsx Bld data-13-14

Page 2980 of 3205


Rs

7876.03

337269598.xlsx Bld data-13-14

Page 2981 of 3205


6297.21
109.00
660.00

6297.21
1158.00
1000.00

1 Cum
1 Cum
1 Cum

Rs

6297.21
109.00
660.00
132.00
7198.21
980.04
8178.25
0.00
0.00
8178.25

Rs

6297.21
1158.00
1000.00
200.00
8655.21
1178.41
9833.62
0.00
0.00
9833.62

1 Cum
1 Cum
1 Cum

onding to IS 456 using WEIGH BATCHER / MIXER with 20mm size


ing cost and conveyance of all materials like cement, fine aggregate
taxes on all materials including all operational, incidental and labour
excluding cost of steel and its fabrication charges for finished item of
, WATER TANKS, RCC WALLS IN BUILDINGS.

Concrete Mixer )
1501.84
727.11
5.50

1 cum
1 cum
1 Kgs

1201.47
290.84
2090.00
3582.31

490.00
448.00
392.00

1 day
1 day
1 day

81.83
74.82
2195.20
2351.85

303.10
152.20
100.00

1 hour
1 hour
1 kl

404.03
202.88
120.00
726.91
6661.07
906.9
7567.97
0
0
7567.97
7567.97

Rs

337269598.xlsx Bld data-13-14

Page 2982 of 3205


6661.07
296.00
1491.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F

4F

5F

6661.07

6661.07

6661.07

296.00
1789.00

296.00
1938.00

296.00
2087.00

357.80
298.20

387.60
447.30

417.40
596.40

844.43
10574.40
1439.70
12014.10
0.00
0.00
12014.10

914.80
10972.67
1493.93
12466.60
0.00
0.00
12466.60

6661.07
296.00
1491.00
298.20
8746.27
1190.8
9937.07
0.00
0.00
9937.07

705.56

10107.63
1376.15
11483.78
0.00
0.00
11483.80

6661.07
533.00
2369.00

1 Cum
1 Cum
1 Cum
Rs

Rs

6661.07
533.00
2369.00
473.80
10036.87
1366.52
11403.39
0.00
0.00
11403.39

337269598.xlsx Bld data-13-14

Page 2983 of 3205


6661.07
984.00
1062.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
6661.07
984.00
1274.00
254.80
212.40

4F
6661.07
984.00
1381.00
276.20
318.60

5F
6661.07
984.00
1487.00
297.40
424.80

844.43

914.80

10091.83

10465.30

10769.07

1374.00

1424.85

1466.21

11465.83

11890.15

12235.28

0.00

0.00

0.00

0.00

0.00

0.00

11465.85

11890.15

12235.30

6661.07
984.00
1062.00
212.40
8919.47
1214.39
10133.86
0.00
0.00
10133.86

705.56

6661.07
503.00

1 Cum
1 Cum

6661.07
503.00

543.00

1 Cum

543.00
108.60
Rs

7815.67
1064.1
8879.77
0.00
0.00

Rs

8879.77

337269598.xlsx Bld data-13-14

Page 2984 of 3205

6661.07
906.00

1 Cum
1 Cum

6661.07
906.00

863.00

1 Cum

863.00
172.60
Rs

8602.67
1171.25
9773.92
0.00
0.00

Rs

9773.92

to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded


t and conveyance of all materials like cement, fine aggregate (sand)
xes on all materials including all operational, incidental and labour
excluding cost of steel and its fabrication charges for finished item of
ppliers approved by the department including pumping, centering,
its fabrication charges for finished item of work. for RCC SLABS,

1501.84
727.11
5.50

1 Cum
1 Cum
1 Cum

1201.47
290.84
2090.00
3582.31

490.00
448.00
392.00

1 Cum
1 Cum
1 Cum

32.83
59.58
1206.18
1298.59

303.10

1 Cum

93.35

152.20
100.00

1 hour
1 Cum

46.88
120.00
260.23
5141.13
699.96
5841.09
0
0
5841.09
5841.09

Rs

5141.13
3194.00
2299.00

1 Cum
1 Cum
1 Cum
Rs

5141.13
3194.00
2299.00
459.80
11093.93
1510.44
337269598.xlsx Bld data-13-14

Page 2985 of 3205

Rs

12604.37
0.00
0.00
12604.37

337269598.xlsx Bld data-13-14

Page 2986 of 3205

Thick

0.10 m
5141.13
197.00
142.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick

5141.13
1970.00
1420.00
284.00
8815.13
1200.18
10015.31
0.00
0.00
10015.31

0.11 m
5141.13
197.00
142.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5141.13
1790.73
1545.30
309.06
258.16
1557.85

10602.23
1443.49
12045.72
0.00
0.00
12045.75

4F
5141.13
1790.73
1681.65
336.33
387.23

5F
5141.13
1790.73
1808.91
361.78
516.31

171.04
9508.11
1294.53
10802.64
0.00
0.00
10802.65

185.29
9804.16
1334.84
11139.00
0.00
0.00
11139.00

Thick

5141.13
1790.73
1290.78
258.16
8480.80
1154.66
9635.46
0.00
0.00
9635.46

0.115 m
5141.13
197.00
142.00

1 Cum
1 Sqm
1 Sqm
Rs

5141.13
1713.90
1235.40
247.08
8337.51
1135.15
9472.66
337269598.xlsx Bld data-13-14

Page 2987 of 3205

Rs

0.00
0.00
9472.66

337269598.xlsx Bld data-13-14

Page 2988 of 3205


3F
5141.13
1713.90
1479.00
295.80
247.08

4F
5141.13
1713.90
1609.50
321.90
370.62

5F
5141.13
1713.90
1731.30
346.26
494.16

171.04
9328.09
1270.02
10598.11
0.00
0.00
10598.15

185.29
9612.04
1308.68
10920.72
0.00
0.00
10920.75

389.58

9266.49
1261.63
10528.12
0.00
0.00
10528.15
Thick

0.12 m
5141.13
197.00
142.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick

5141.13
1641.01
1182.86
236.57
8201.57
1116.64
9318.21
0.00
0.00
9318.21

0.125 m
5141.13
197.00
142.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick

5141.13
1576.00
1136.00
227.20
8080.33
1100.14
9180.47
0.00
0.00
9180.47

0.14 m
5141.13
197.00
142.00

1 Cum
1 Sqm
1 Sqm
Rs

5141.13
1406.58
1013.88
202.78
7764.37
1057.12
8821.49
0.00
337269598.xlsx Bld data-13-14

Page 2989 of 3205


Rs

0.00
8821.49

337269598.xlsx Bld data-13-14

Page 2990 of 3205


3F
5141.13
1406.58
1213.80
242.76
202.78
389.58

8596.63
1170.43
9767.06
0.00
0.00
9767.10

4F
5141.13
1406.58
1320.90
264.18
304.16

5F
5141.13
1406.58
1420.86
284.17
405.55

171.04
8607.99
1171.98
9779.97
0.00
0.00
9780.00

185.29
8843.59
1204.05
10047.64
0.00
0.00
10047.65

Thick

0.15 m
5141.13
197.00
142.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5141.13
1313.99
1133.90
226.78
189.43
389.58

8394.81
1142.95
9537.76
0.00
0.00
9537.80

4F
5141.13
1313.99
1233.95
246.79
284.14

5F
5141.13
1313.99
1327.33
265.47
378.86

171.04
8391.04
1142.44
9533.48
0.00
0.00
9533.50

185.29
8612.06
1172.53
9784.59
0.00
0.00
9784.60

5141.13
1313.99
947.14
189.43
7591.69
1033.61
8625.30
0.00
0.00
8625.30

337269598.xlsx Bld data-13-14

Page 2991 of 3205


Thick

0.175 m
5141.13
203.00
146.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
Thick

5141.13
1159.13
833.66
166.73
7300.65
993.98
8294.63
912.41
0.00
9207.04

0.20 m
5141.13
203.00
146.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
5141.13
1015.00
875.000
175.000
146.00
389.58

7741.71
1054.03
8795.74
0.00
0.00
8795.74

4F
5141.13
1015.00
950.000
190.000
219.00

5F
5141.13
1015.00
1020.000
204.000
292.00

171.0396
7686.17
1046.47
8732.64
0.00
0.00
8732.64

185.2929
7857.42
1069.79
8927.21
0.00
0.00
8927.21

Thick

5141.13
1015.00
730.00
146.00
7032.13
957.42
7989.55
0.00
0.00
7989.55
7989.55

0.25 m
5141.13
203.00
146.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5141.13
812.00
584.00
116.80
6653.93
905.93
7559.86
831.58
0.00
8391.44
337269598.xlsx Bld data-13-14

Page 2992 of 3205

337269598.xlsx Bld data-13-14

Page 2993 of 3205


Thick

0.350 m
5141.13
212.00
152.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs

5141.13
1737.00
1251.00

1 Cum
1 Cum
1 Cum
Rs

Rs
3F
5141.13
1737.00
1501.00
300.20
250.20

4F
5141.13
1737.00
1626.00
325.20
375.30

5F
5141.13
1737.00
1751.00
350.20
375.30

169.14
9373.77
1276.24
10650.01
0.00
0.00
10650.05

183.23
9537.86
1298.58
10836.44
0.00
0.00
10836.45

5141.13
606.32
434.72
86.94
6269.11
853.54
7122.65
0.00
0.00
7122.65

5141.13
1737.00
1251.00
250.20
8379.33
1140.85
9520.18
0.00
0.00
9520.18

259.72

9189.25
1251.12
10440.37
0.00
0.00
10440.40

337269598.xlsx Bld data-13-14

Page 2994 of 3205

5141.13
194.00
163.00

1 Cum
1 Sqm
1 Sqm
Rs

Rs
3F
321.32
194.00
196.00
39.20
32.60

4F
321.32
194.00
212.00
42.40
48.90

5F
321.32
194.00
228.00
45.60
65.20

10.57
829.19
112.89
942.08
0.00
0.00
942.10

11.45
865.57
117.85
983.42
0.00
0.00
983.45

321.32
194.00
163.00
32.60
710.92
96.79
807.71
0.00
0.00
807.71
807.71

24.35

807.47
109.94
917.41
0.00
0.00
917.45

337269598.xlsx Bld data-13-14

Page 2995 of 3205

Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as
ghtening, cutting, bending to required sizes and shapes, placing in
nding wire of 18 SWG, forming grills for reinforcement work as per
wastages such as overlaps, couplings, chairs, spacer bars including
harges such as cutting, bending, placing in position, tying including
SS No.126

43000.00
70.00

1 Ton
1 kg

45150.00
420.00

518.00
392.00

1 day
1 day

5180.00
3920.00

1 MT

Sub Total:
Rs.

7653.80
62323.80
0.00
0.00
62324.00
62.32

Cm in Cement Mortor 1:3 Prop including Cost & conveyance of all


materials, including all labour charges like mixing Cement Mortor,

5.50
3888.67
727.11

490.00
448.00
392.00

1 Kg
1000 Nos
1 Cum

528.00
1991.00
145.42
2664.42

1 day.
1 day.
1 day.
Rs

Rs

117.60
250.88
740.88
1109.36
3773.78
513.8
4287.58
0.00
0.00
4287.58
4287.58

Cm in Cement Mortor 1:4 Prop including Cost & conveyance of all


materials, including all labour charges like mixing Cement Mortor,

5.50
3888.67
727.11

490.00

1 Kg
1000 Nos
1 Cum

1 day.

396.00
1991.00
145.42
2532.42
117.60
337269598.xlsx Bld data-13-14

Page 2996 of 3205


448.00
392.00

1 day.
1 day.
Rs

Rs

250.88
740.88
1109.36
3641.78
495.83
4137.61
0.00
0.00
4137.61
4137.61

Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all


materials, including all labour charges like mixing Cement Mortor,

5.50
3888.67
727.11

490.00
448.00
392.00

1 Kg
1000 Nos
1 Cum

264.00
1991.00
145.42
2400.42

1 day.
1 day.
1 day.
Rs

Rs

117.60
250.88
740.88
1109.36
3509.78
477.86
3987.64
0.00
0.00
3987.64
3987.64

3F
4F
5F
3509.78
3509.78
3509.78
39.086956522 39.0869565 39.0869565
433.43
532.00
630.61
86.69
106.40
126.12
236.26
354.39
472.52
4305.25
586.16
4891.41
0.00
0.00
4891.45

4541.66
618.35
5160.01
0.00
0.00
5160.05

4778.12
650.54
5428.66
0.00
0.00
5428.70

cks of size 290 x 150 x 140 mm for manufacturing of flyash solid


ng cost and conveyance of all materials, labour charges, seiniorage
g/sqm for walls for Superstructure Walls.

12000.00
2335.87

1000 Nos
1 Cum

1776.00
233.59

337269598.xlsx Bld data-13-14

Page 2997 of 3205


490.00
448.00
392.00

1 day.
1 day.
1 day.
Rs

Rs

205.80
412.16
1097.60
3725.15
507.18
4232.33
0
0
4232.33
4232.35

337269598.xlsx Bld data-13-14

Page 2998 of 3205


3F
3725.15
44.95
498.45
99.69
179.48
4547.72
619.17
5166.89
0.00
0.00
5166.90

4F
3725.15
44.95
611.80
122.36
269.22
4773.48
649.91
5423.39
0.00
0.00
5423.40

5F
3725.15
44.95
725.20
145.04
358.96
4999.30
680.65
5679.95
0.00
0.00
5679.95

cks of size 290 x 200 x 140 mm for manufacturing of flyash solid


ng cost and conveyance of all materials, labour charges, seiniorage
g/sqm for walls for Superstructure Walls.

16000.00
2335.87
490.00
448.00
392.00

1000 Nos
1 Cum

1760.00
233.59

1 day.
1 day.
1 day.
Rs

Rs
3F
3709.15
44.95
498.45
99.69
271.70
4623.94
629.55
5253.49
0.00
0.00
5253.50

4F
3709.15
44.95
611.80
122.36
407.55
4895.81
666.56
5562.37
0.00
0.00
5562.40

205.80
412.16
1097.60
3709.15
505
4214.15
0.00
0.00
4214.15
4214.15

5F
3709.15
44.95
725.20
145.04
543.40
5167.74
703.59
5871.33
0.00
0.00
5871.35

ks of size 290 x 112/100 x 140 mm for manufacturing of flyash solid


ng cost and conveyance of all materials, labour charges, seiniorage
g/sqm for walls for Superstructure Walls.

9000.00
2335.87
490.00
448.00

1000 Nos
1 Cum
1 day.
1 day.

1782.00
233.59
205.80
412.16
337269598.xlsx Bld data-13-14

Page 2999 of 3205


392.00

1 day.

1097.60
Rs

Rs

3731.15
508
4239.15
0.00
0.00
4239.15
4239.15

337269598.xlsx Bld data-13-14

Page 3000 of 3205


3F
3731.15
74.92
830.75
166.15
452.83
5255.80
715.58
5971.38
0.00
0.00
5971.40

4F
3731.15
74.92
1019.67
203.93
679.25
5708.92
777.27
6486.19
0.00
0.00
6486.20

5F
3731.15
74.92
1208.67
241.73
905.67
6162.13
838.97
7001.10
0.00
0.00
7001.15

m (1:3) using second class traditional size bricks including cost of all
ry, mixing cement mortar, curing etc., complete for finished item of

3888.67
5.50
727.11
490.00
448.00
392.00

1000 Nos
1 Kg
1 Cum

2197.10
583.00
159.96

1 day.
1 day.
1 day.
Rs

Rs
3F
4580.86
89.90
996.90
199.38
543.40
6410.44
872.78
7283.22
0.00
0.00
7283.25

4F
4580.86
89.90
1223.60
244.72
815.10
6954.18
946.81
7900.99
0.00
0.00
7901.00

294.00
268.80
1078.00
0.00
4580.86
623.68
5204.54
0.00
0.00
5204.54

5F
4580.86
89.90
1450.40
290.08
1086.80
7498.04
1020.86
8518.90
0.00
0.00
8518.90

Prop using hard granite stone including cost & Conveyance of all
l Materials, ,labour charges for cutting Stones to required size and
finished item of Work .

5.50
592.95
1425.95
727.11

1 Kg
1 Cum
1 Cum
1 Cum

369.60
557.37
228.15
203.59

490.00

1 day

1225.00
337269598.xlsx Bld data-13-14

Page 3001 of 3205


392.00

1 day
Rs

Rs

909.44
3493.15
475.59
3968.74
0.00
0.00
3968.74

337269598.xlsx Bld data-13-14

Page 3002 of 3205

Prop using hard granite stone including cost & Conveyance of all
l Materials, ,labour charges for cutting Stones to required size and
finished item of Work .

5.50
592.95
1425.95
727.11

1 Kg
1 Cum
1 Cum
1 Cum

422.40
557.37
228.15
232.68

490.00
392.00

1 day
1 day

735.00
909.44
3085.04
420.03
3505.07
0.00
0.00
3505.07

Rs

Rs

hard granite stone including cost & Conveyance of all materials like
our charges for cutting Stones to required size and shape, mixing of
Work .

5.50
592.95
438.95
1425.95
727.11

1 Kg
1 Cum
1 Cum
1 Cum
1 Cum

435.60
260.90
219.48
228.15
239.95

490.00
392.00

1 day
1 day

588.00
784.00
2756.08
375.24
3131.32
0.00
0.00
3131.32

Rs

Rs

hard granite stone including cost & Conveyance of all materials like
our charges for cutting Stones to required size and shape, mixing of
Work .

5.50
592.95
438.95
1425.95
727.11

1 Kg
1 Cum
1 Cum
1 Cum
1 Cum

326.70
260.90
219.48
228.15
239.95

490.00
392.00

1 day
1 day

588.00
784.00
2647.18
360.41
3007.59

Rs

337269598.xlsx Bld data-13-14

Page 3003 of 3205

Rs

0.00
0.00
3007.59

337269598.xlsx Bld data-13-14

Page 3004 of 3205

(1:3) Prop . for including cost & conveyance of all materials to site ,
for finished item of work

5.50
727.11

1 Kg
1 Cum

79.20
21.81

448.00
392.00

1 day
1 day

224.00
290.08
615.09
83.74
698.83
0.00
0.00
698.83

Rs

Rs

(1:3) Prop . for including cost & conveyance of all materials to site ,
for finished item of work

5.50
727.11

1 Kg
1 Cum

158.40
43.63

448.00
392.00

1 day
1 day

224.00
290.08
716.11
97.5
813.61
0.00
0.00
813.61

Rs

Rs

including cost and conveyance of all materials to site, seigniorage


charges etc., including cutting grooves where ever necessary etc.,

3703.87

1 Cum

555.58

490.00
392.00

1 day
1 day

294.00
376.32
1225.90
166.91
1392.81
0.00
0.00
1392.81

Rs

Rs
3F
1225.90
21.10
200.50
40.10
110.80

4F
1225.90
21.10
245.40
49.08
166.20

5F
1225.90
21.10
290.30
58.06
221.60

337269598.xlsx Bld data-13-14

Page 3005 of 3205


1598.40
217.62
1816.02
0.00
0.00
1816.05

1707.68
232.50
1940.18
0.00
0.00
1940.20

1816.96
247.38
2064.34
0.00
0.00
2064.35

337269598.xlsx Bld data-13-14

Page 3006 of 3205


including cost and conveyance of all materials to site, seigniorage
charges etc., including cutting grooves where ever necessary etc.,

3019.87

1 Cum

452.98

490.00
392.00

1 day
1 day

294.00
376.32
1123.30
152.94
1276.24
0.00
0.00
1276.24

Rs
3F
1123.30
9.00
122.40
24.48
77.00
1356.18
184.64
1540.82
0.00
0.00
1540.85

4F
1123.30
9.00
145.00
29.00
115.50
1421.80
193.58
1615.38
0.00
0.00
1615.40

5F
1123.30
9.00
167.70
33.54
154.00
1487.54
202.53
1690.07
0.00
0.00
1690.10

including cost and conveyance of all materials to site, seigniorage


charges etc., including cutting grooves where ever necessary etc.,

2335.87

1 Cum

350.38

490.00
392.00

1 day
1 day

294.00
376.32
1020.70
138.97
1159.67
0.00
0.00
1159.67

Rs

Rs

including cost and conveyance of all materials to site, seigniorage


charges etc., including cutting grooves where ever necessary etc.,

3019.87

1 Cum

573.77

490.00
392.00

1 day
1 day

294.00
376.32
1244.09

Rs

337269598.xlsx Bld data-13-14

Page 3007 of 3205

Rs

169.38
1413.47
0.00
0.00
1413.47

337269598.xlsx Bld data-13-14

Page 3008 of 3205


3F
1244.09
9.00
99.70
19.94
54.30
1427.03
194.29
1621.32
0.00
0.00
1621.35

4F
1244.09
9.00
122.40
24.48
81.45
1481.42
201.70
1683.12
0.00
0.00
1683.15

5F
1244.09
9.00
145.00
29.00
108.60
1535.69
209.08
1744.77
0.00
0.00
1744.80

including cost and conveyance of all materials to site, seigniorage


charges etc., including cutting grooves where ever necessary etc.,

3019.87

1 Cum

634.17

490.00
392.00

1 day
1 day

460.60
627.20
1721.97
234.45
1956.42
0.00
0.00
1956.42

Rs

Rs

M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge
site, seigniorage charges, all operational, including charges, labour
es where ever necessary etc., complete for finished item of work of

5.50
727.11

1 Kg
1 Cum

236.50
130.88

5.50
727.11

1 Kg
1 Cum

79.75
29.08

490.00
448.00
392.00

1 day
1 day
1 day
Rs

Rs
3F
2972.27
9.00
99.70

4F
2972.27
9.00
122.40

308.70
658.56
1528.80
2972.27
404.67
3376.94
0.00
0.00
3376.94

5F
2972.27
9.00
145.00
337269598.xlsx Bld data-13-14

Page 3009 of 3205


19.94
54.30
3155.21
429.58
3584.79
0.00
0.00
3584.80

24.48
81.45
3209.60
436.99
3646.59
0.00
0.00
3646.60

29.00
108.60
3263.87
444.38
3708.25
0.00
0.00
3708.25

337269598.xlsx Bld data-13-14

Page 3010 of 3205

M. (1:5) and top coat of 4mm thick in C.M. (1:3) with dubara sponge
site, seigniorage charges, all operational, including charges, labour
where ever necessary etc., complete for finished item of work.

5.50
727.11

1 Kg
1 Cum

174.35
79.98

5.50
727.11

1 Kg
1 Cum

105.60
29.08

490.00
448.00
392.00

1 day
1 day
1 day

308.70
658.56
1528.80
2885.07
392.8
3277.87
0.00
0.00
3277.87

Rs

Rs
3F
2885.07
9.00
99.70
19.94
54.30
3068.01
417.71
3485.72
0.00
0.00
3485.75

4F
2885.07
9.00
122.40
24.48
81.45
3122.40
425.11
3547.51
0.00
0.00
3547.55

5F
2885.07
9.00
145.00
29.00
108.60
3176.67
432.50
3609.17
0.00
0.00
3609.20

mesh & nominal reinforcement as directed by Engineer-in-charge with


arges, sales & other taxes on all materials, operational & incidental,
form work, lift charges etc., complete for finished items of work but
03)

16.00
3703.87
5.50
1225.90

1 sqm
1 cum
1 kg
10 sqm

212.80
925.97
275.00
2672.46

490.00
448.00
392.00

1 day
1 day
1 day

3920.00
448.00
3920.00

303.10

1 Hrs
Rs

606.20
12980.43
1767.29
337269598.xlsx Bld data-13-14

Page 3011 of 3205

Rs

14747.72
0.00
0.00
14747.72

337269598.xlsx Bld data-13-14

Page 3012 of 3205


& SKIRTING

andur Stone slabs) set over base coat of CM (1:8) over already laid
3.3 kgs per sqm. & Jointed with neat cement to full depth including
g seigniorage charges, labour charges for dressing of flooring stones

154.40
5.50
5.50
5.50
727.11

1 sqm
1 kg.
1 kg.
1 kg.
1 cum

1698.40
118.80
181.50
110.00
87.25

490.00
448.00
392.00

1 day
1 day
1 day

1519.00
492.80
337.12
45.45
4590.32
624.97
5215.29
0.00
0.00
5215.29

Rs

Rs

base coat of cement mortar (1 : 8) 12 mm thick over CC bed already


ding cost of all materials like flooring stone, cement, sand, and water
s etc., complete for finished item of work, but excluding the cost of

115.70

1 Sqm

1214.85

5.50
5.50
727.11
727.11

1 Kg
1 Kg
1 Cum
1 Cum

118.80
52.80
87.25
14.54

490.00
448.00
392.00

1 day
1 day
1 day
Rs

Rs

470.40
1003.52
1293.60
4255.76
579.42
4835.18
0.00
0.00
4835.18

337269598.xlsx Bld data-13-14

Page 3013 of 3205

ade) set over base coat of cement mortar (1:6) 12 mm thick over CC
spread @ 3.3.kgs per sqm & jointed with neat cement to full depth
and tiles etc., complete, including seigniorage charges, complete for

235.00
5.50
5.50
5.50
727.11

1 sqm
1 kg.
1 kg.
1 kg.
1 kg.
1 cum

2467.50
158.40
181.50
33.00
0.00
87.25

448.00
392.00
392.00

1 day
1 day
1 day

430.08
878.08
1293.60
5529.41
55.29
5584.70
760.36
6345.06
0.00
0.00
6345.06

Rs

Rs

base coat of cement mortar (1:8), 12 mm thick over CC bed already


.kgs per sqm & jointed neatly with white cement paste to full depth
water and tiles etc., complete, including seigniorage charges, etc.,

1225.00
5.50
5.50
5.50
727.11
727.11

1 sqm
1 kg.
1 kg.
1 kg.
1 cum
1 cum

12862.50
118.80
181.50
33.00
87.25
14.54

490.00
448.00
392.00

1 day
1 day
1 day

470.40
1003.52
1293.60
16065.11
160.65
16225.76
2209.14
18434.90
0.00
0.00
18434.90

Rs

337269598.xlsx Bld data-13-14

Page 3014 of 3205

cement mortar (1:8), 12 mm thick over CC bed already laid or RCC


m & jointed neatly with white cement paste to full depth mixed with
es etc., complete, including seigniorage charges, etc., complete for

447.00
5.50
5.50
27.00
727.11

1 sqm
1 kg.
1 kg.
1 kg.
1 cum

4693.50
118.80
181.50
54.00
87.25

490.00
448.00
392.00

1 Nos
1 Nos
1 Nos

470.40
1003.52
1293.60
79.03
7981.60
1086.69
9068.29
0.00
0.00
9068.29

Rs

Rs

other than black set over base coat of cement mortar (1:8), 20 mm
consistency spread @ 3.3.kgs per sqm & jointed neatly with white
materials like cement, sand water and tilesetc., complete, including
rk, but excluding the cost of conveyance of all materials

2751.00

1 sqm

28885.50

5.50
5.50
5.50

1 kg.
1 kg.
1 kg.

198.00
181.50
33.00

727.11

1 cum

145.42

490.00
448.00
392.00

1 day
1 day
1 day

1470.00
448.00
3136.00
344.97
34842.39
4877.93
39720.32
0.00
0.00
79440.64
79442.00

337269598.xlsx Bld data-13-14

Page 3015 of 3205

mm to 12 mm size hard granite machine crushed metal laid over CC


and finishing the top surface to required smoothness and slopes and
e, including seigniorage charges, etc., complete for finished item of

1226.84
5.50
727.11

1 Cum
1 Kg
1 Cum

208.56
660.00
61.80

490.00
448.00
392.00

1 day
1 day
1 day

612.50
26.88
1176.00
2745.74
27.46
2773.20
377.57
3150.77
0.00
0.00
3150.77

Rs

Rs

ick and plastered over with 12 mm thick in CM(1:3) and finishing the
erials like cement, metal, sand and water etc., complete, including

3163.58
1225.90

1 cum
10 sqm

3163.58
1225.90

490.00
448.00
392.00

1 day
1 day
1 day

73.50
156.80
2116.80
67.37
6803.95
926.36
7730.31
0.00
0.00
7730.31

Rs

ceramic tiles 7.30 mm thick length equal to flooring stones, set over
rate of 3.30 kgs per sqm and jointed with white cement paste mixed
, sand and water etc., complete including seigniorage charges, etc.,

447.00
727.11
5.50
5.50
27.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

4693.50
87.25
316.80
181.50
162.00

490.00
392.00

1 Nos
1 Nos

377.30
313.60
337269598.xlsx Bld data-13-14

Page 3016 of 3205


Rs

Rs

6131.95
834.86
6966.81
0.00
0.00
6966.81

15 to 18 mm thick polished Shahabad stone length equal to flooring


tency spread at the rate of 3.30 kgs per sqm and jointed with white
erials like Shahabad stone, cement, sand and water etc., complete
of conveyance of all materials

154.40
727.11
5.50
5.50

10 sqm
1 cum
1 kgs
1 kgs

169.84
87.25
316.80
181.50

490.00
448.00
392.00

1 Nos
1 Nos
1 Nos

470.40
1003.52
1215.20
34.45
3478.96
487.05
3966.01
0.00
0.00
3966.01

Rs

Rs

ny size 1st quality set over a base coat of CM(1:3) Prop. 12mm thick
nt per One Square Meter and jointed wiyh neat White cement paste
e cement, sand, water, flooring Tiles etc. to site, all operational,
arges etc., complete for finished item of work (for toilets)

397.00
727.11
5.50
5.50
27.00

1 Sqm
1 cum
1 kgs
1 kgs
1 kgs

4168.50
87.25
316.80
181.50
162.00

490.00
392.00

1 day
1 day

377.30
313.60
56.07
5663.02
792.82
6455.84
0.00
0.00
6455.84

Rs

337269598.xlsx Bld data-13-14

Page 3017 of 3205

NG
CM(1:3), 20mm thick with 1kg of water proof compound per bag of
ges, excluding conveyance charges of materials and including all
d thread lining, curing, rounding off junctions of wall and slab etc,,

3703.87
24.00

1 Cum
1 Kg

777.81
48.00

490.00
448.00
392.00

1 day
1 day
1 day

323.40
689.92
1450.40
3289.53
460.53
3750.06
0.00
0.00
3750.06

Rs

Rs

bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with
er lapping of sheets complete (upto a pitch of 600) and seigniorage
onveyance of all materials

56.00

1 kgs

8668.80

5.00

1 nos

239.57

9.00

1 nos

395.12

0.30

1 nos

27.54

0.25
175.00
487.00

1 nos
1 litre
1 litre

22.95
24.00
98.98

448.00
392.00

1 day
1 day

376.37
356.94

518.00
392.00

1 day
1 day

31.73
24.01

518.00
392.00

1 day
1 day

71.03
53.75
10390.79
1414.71
11805.50
0.00
0.00
11805.50
1180.55

Rs

Rs

337269598.xlsx Bld data-13-14

Page 3018 of 3205


Rs

118.06

337269598.xlsx Bld data-13-14

Page 3019 of 3205

ng with G.I J bolts & nuts 8 mm dia G.I plain washers complete
st of purlins, rafters, trusses & cost of conveyance of all materials

207.00

1 Sqm

2339.10

5.00
1.00
0.25

1 nos
1 nos
1 nos

110.13
22.03
5.51

448.00
392.00

1 day
1 day

193.63
211.87
10.00
10.00

Rs
Rs

2902.27
395.14
3297.41
0.00
0.00
3297.41
329.74

er Water base Exterior Gr-2 after thoroughly brushing the surface to


abour charges and incidental such as scaffolding, lift charges etc.,
80.00
490.00
448.00

1 Kg
1 day
1 day

Rs

80.00
102.90
219.52
402.42
2.01
404.43
55.06
459.49
0.00
0.00
459.49
459.49

even shade after thoroughly brushing the surface to remove all dirt
incidental such as scaffolding, lift charges etc., complete for finished

27.00

1 Kg

32.40
10.00

490.00
392.00

1 day
1 day

53.90
86.24
182.54
0.91
183.45
24.98
208.43
0.00
337269598.xlsx Bld data-13-14

Page 3020 of 3205

Rs

0.00
208.43
208.43

337269598.xlsx Bld data-13-14

Page 3021 of 3205

even shade after thoroughly brushing the surface to remove all dirt
incidental such as scaffolding, lift charges etc., complete for finished

27.00

1 Kg

54.00
5.00

490.00
392.00

1 day
1 day

102.90
125.44
287.34
2.87
290.21
39.51
329.72
0.00
0.00
329.72
329.72

Rs

Rs

n even shade after thoroughly brushing the surface to remove all dirt
incidental such as scaffolding, lift charges etc., complete for finished

Rs

Rs

290.21
145.11
435.32
59.27
494.59
0.00
0.00
494.59

oof Cement Paint over Priming Coat, One Coat (All Colours) making
dirt and remains of loose powdered materials, including cost and
mplete for finished item of work as per SS 912.

1106.00
560.00
448.00
392.00

25 Kg
1 day
1 day
1 day

Rs

0.00
88.48
50.40
94.08
588.00
8.21
829.17
112.89
942.06
0.00
0.00
942.06

337269598.xlsx Bld data-13-14

Page 3022 of 3205

sable distemper of approved brand and shade over a base coat of


urughly brushing the surface to remove all dirt and remains of loose
ational, incidental, labour charges etc. complete for finished item of

134.00
560.00
448.00
81.00
560.00
448.00

1 Kg
1 day
1 day
1 Kg
1 day
1 day
Rs

Rs

67.00
44.80
85.12
137.70
201.60
376.32
912.54
124.24
1036.78
0.00
0.00
1036.78

onveyance of all materials to site, sales & other taxes, incidental,


121.00

1 Ltr

560.00
448.00

1 day.
1 day.

84.70

Rs

Rs

117.60
219.52
0.00
421.82
57.43
479.25
0.00
0.00
479.25

od Work, Old Wood Work & New Iron Work including cost and
r charges etc., complete for finished item of work. (APSS No. 1201,
933.00

1 Ltr

653.10

448.00
0.00

1 day.
1 day.

94.08
0.00
0.00
747.18
101.73
848.91
0.00
0.00
848.91

Rs

Rs

ATORS

cked together through their entire length and jointed together at the
B class pipe with brackets, plates, guide channels, stoppers, bottom
ding cost of hood cover and springs complete, painted with one coat
f work as per special spn: 1108
2500.00

1 Sqm

2500.00
350.00

337269598.xlsx Bld data-13-14

Page 3023 of 3205

2850.00
0.00
0.00
Rs
2850.00
IAL BUILDINGS WITH GRILL PROVISION) Providing and Fixing of
er IS 277 with Zinc of 120 GSM). Primer coated with epoxy primer of
d with 5-7 microns thick alkyd backer. Section for outer frame should
0mm and Fixed glass beading section should be of 12x12mm. Outer
/Grills. The sections are to be cut to length metre joined with corner
os. of Stainless Steel heavy duty Pivot hinges shall be provided per
e provided all around the glass. The above frames should be fixed to
ard bars with 6 (152.4mm) pitch etc., complete for finished item of

me section size of 48x50mm shutter frame section size of 47x20mm


5303.00

1 Sqm

5303.00
742.42
6045.42

Rs

0.00
0.00
6045.42

e section size of 48x50mm. Shutter frame section size of 47x20mm.


4673.00

1 Sqm

Rs

4673.00
654.22
5327.22
0.00
0.00
5327.22

NGS WITH GRILL & FLYMESH PROVISION) Providing & Fixing of


er IS 277 with zinc of 150 GSM). Primer coated with epoxy primer of
d with 5-7 microns thick alkyd backer. Section for outer frame should
ction should be of 12x12mm and section for shutters should be of
d a 20mm provision for guard bars/grills. Fly mesh shutter section
ket. Centre mullions are to be fixed with mullion cap, seccolor stay,
ovided per Shutter. The windows should be panelled with 5mm thick
ded all around the glass. The above frames should be fixed to the
rs with 6 (152.4mm) pitch , complete for finished item of work

e section size of 72x50mm. Shutter frame section size of 47x20mm.


6300.00

1 Sqm

6300.00
882.00
7182.00

Rs

0.00
0.00
7182.00

337269598.xlsx Bld data-13-14

Page 3024 of 3205

oll formed sections made of galvanized Steel colour coated/powder


q.mtr) with total coated thickness of 0.60mm. Primer coat with epoxy
back coated with Alkyd backer of 5-7 microns or powder coated with
e of 79x44mm, external frame sides and top should be of 69x24mm,
d be of 26x30mm. The windows should be panelled with 5mm thick
n. Gaskets are to be made of Ethyl Propylene Diamine Monomer
ket. The above frames should be fixed to the concrete/masonry walls
h (152.4mm) and all Taxes complete for finished item of work

5864.00

1 Sqm

Rs

5864.00
820.96
6684.96
0.00
0.00
6684.96

ADE SOLID SINGLE SIDE PRELAM PANEL PVC DOOR SHUTTER


or stiles, and 15mmX15mm for top and bottom rails. The MS. Frame
d with 5mm thick heat moulded Rajshri single side Prelam Pac C
sheets shall be for the top, bottom and lock rails. Panelling of 5mm
iles and rails (which should have a 5mm 45 bent portion as beading)
ortion as beading ) using 2nos. 15mm wide X 5mm thick Pac sheet
anel using solvent cement etc. an additional 5mm thick Pac strip of
hesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be
ge, manufacture specification and drawing

2450.00

1 Sqm

Rs

2450.00
343.00
2793.00
0.00
0.00
2793.00

ded Particle Board as per IS 14276 (Bison Panel or Equivalent) :


(Base steel as per IS277 with zinc of 120 Gms/sqm) colour coated
5-7 microns thick, finish paint with polyester paint of 12-16 microns.
size of frame section should be of 50mm x 50mm. With necessary
n Panel or Equivalent) Single Leaf with all round styles U section
teel profiles with 16mm thick Cement Bonded particle Board (Bison
ost inclusive of MS nickel coated Aldrop of size 250mm long 2nos.
site and applying one coat primer , one coat of luppum and two coats

2967.00

1 Sqm

Rs

2967.00
415.38
3382.38
0.00
0.00
3382.38

337269598.xlsx Bld data-13-14

Page 3025 of 3205

x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38


65x65mmx8mm MS Angle and middle guide rail at site height with
, rivets, locking arrangements, stoppers, handles, all accessories all
work as per special spn 1105
2187.00

1 Sqm

Rs

2187.00
306.18
2493.18
0.00
0.00
2493.18

ntilator including all labour charges etc., complete


375.00

1 Sqm

375.00

Rs

52.50
427.50
0.00
0.00
427.50

337269598.xlsx Bld data-13-14

Page 3026 of 3205

MS square bars horizontally at 125mm centre to centre and vertically


y making cutting brick masonry, fixing and making to original surface
materials ,cutting, bending, welding including all operational charges

1.50

2.25 Sqm

3.00
3.00
2.00
8.00 Rmt
1.20 Kg/Rmt

9.60 Kgs

8.00 Rmt
18.00 Rmt
26.00 Rmt
0.78 Kg/Rmt

40.00
43.00
28.00
5.60

20.28 Kgs
29.88 Kgs
1 Kg
1 Kg
1 Kg
1 Kg

384.00
872.04
836.64
167.33
1876.01
833.78
62.78

Rs.
Rs.

harges for lifting and fixing the stone in position at all levels:
90.00

1 Sqm

94.50

80.00

1 Rmt

107.20

18.9
220.60
30.03
250.63
0.00
0.00
250.63

Rs

harges for lifting and fixing the stone in position at all levels:
1287.00

10 Sqm

135.14

80.00

1 Rmt

107.20

27.03
269.37
36.67
306.04
0.00
0.00
337269598.xlsx Bld data-13-14

Page 3027 of 3205


Rs

306.04

337269598.xlsx Bld data-13-14

Page 3028 of 3205


nibs as per design in plate No. 22/2/2. (earth work & concrete to be

370.00

1m

448.00
490.00
392.00

1 day
1 day
1 day

484.70

Rs
Rs

44.80
196.00
156.80
0.00
8.82
891.12
121.33
1012.45
0.00
0.00
1012.45
809.96
809.96

onveyance of all material and all labour chages etc complete.


3.56 Kg/Rmt
0.18
3.74
43.00
length
1.00
479.25

1 Kg

160.73

0.150 Sqm
10 Sqm
Rs

7.19
50.38
218.30

deformed steel Anchor rods with 0.75m length driven in to the hole
all materials, machinary, labour, drilling and cleaning hole, driving

43.00

1 Kg

1019.10

140.00

1 Nos

1400.00

88.00

1 Nos

880.00

518.00
448.00
392.00

1 day
1 day
1 day

259.00
224.00
392.00
4174.10
417.41

Rs
Rs

337269598.xlsx Bld data-13-14

Page 3029 of 3205


Rs

417.45

337269598.xlsx Bld data-13-14

Page 3030 of 3205

S 226 and IS 808 as directed by the departmental officers including


he angles with two coats of Synthetic anamel painting including cost
all after raising the wall

43.00

1 Kg

193.50

28.00

1 Kg

126.00

5.60

1 Kg

25.20

421.82

10 Sqm
Rs

5.06
349.76

ight from ground level and 1200mm width by using angle iron size
be fitted with flat iron supports of size 25x6mm on top, bottom and
tuds complete duly painted with one coat of red oxide and two coats

43.00

1 Kg

901.71

43.00

1 Kg

182.75

1 Sqm

535.20

1 Kg

706.16

223.00

28.00

3982.98

1 Cum

71.69

848.91

10 Sqm

499.16

Rs
Rs

2896.67
394.38
3291.05
0.00
0.00
3291.05
274254.17
2742.54

Heavy Beams and Girders including cost of welding rods, power


18.00

1 Kg

18.00
3.60
21.60
3.02
24.62
0.00
337269598.xlsx Bld data-13-14

Page 3031 of 3205


Rs

0.00
24.62

337269598.xlsx Bld data-13-14

Page 3032 of 3205

d Girders erecting in position and fixing by using chain pulley blocks,


16.00

1 Kg

16.00
3.20
19.20
2.69
21.89
0.00
0.00
21.89

Rs

all material , labour charges for fabrication and fixing in postion etc,.
43.00
0.15
21.60
19.20

1 Kg
1 Kg
1 Kg
1 Kg

43.00
0.15
21.60
19.20
83.95
11.75
95.70
0.00
0.00
95.70

Rs

40x40x6 mm with 10 mm square rod at bottom for tie rod with 3


Flat 200 mm long, including c/c of all materials and labour chrges,
5.90
3.50
0.78
0.78
Kgs
Nos.
Kg
kg

Rmt

20.65 Kgs
1.08 Kgs
1.40 Kgs
23.13 Kgs
43.00 Kg
31.00 each
28.00 Kg
5.60 Kg
Each
Rate per
1 Rmt

994.61
93.00
647.65
129.53
1864.79
316.10

type with commercial ply on both faces with 1no. 300 mm long
door latch 1 No. door stopper ( all fixturs MS Powder coated )

1.845 Sqm
2205.00
164.00
101.00
92.00
144.00
413.00

1 Sqmt
1 each
1 each
1 each
1 each
1 Sqmt
Rate per

Each
1 Sqm

4068.23
164.00
202.00
92.00
144.00
761.99
5432.25
2944.30

337269598.xlsx Bld data-13-14

Page 3033 of 3205

xed post and MS Window Section of E Z 7 with lugs, glazing clips


10cm c/c as per approved design with cost and conveyance of all
s like MS Z shaped hold fast, lugs, tower bolts, etc., complete for

Area

1.44 Sqm

2.40
2.40
0.80
5.60 Rmt
2.40
4.80
7.20 Rmt
12.80 Rmt
1.20 Rmt
14.40 Rmt
1.44 Sqm
1.03 Kg/Rmt

13.20 Kgs

1.15 Kg/Rmt
0.78 Kg/Rmt

1.40 Kgs
11.20 Kgs

43.00
43.00
31.00
309.00
309.40
28.00
5.60

1 kg
1 kg
1 each
1 sqm
1 sqm
1 Kg
1 Kg
Rate per

627.80
481.60
62.00
444.96
445.54
722.40
144.48
2928.78
2033.90

Each
1 Sqm

25mm long hinges and shutter with 10 mm thick plaing cement


) including cost and conveyance of all materials and labour charges

1.5375 Sqm
0.78 Kg/Rmt

1.10
43.00
28.00
5.60

0.936

8.69 Kgs
1.00
1.00
1.00

Kgs

Kg
Kg
Kg

373.67
243.32
48.66

291.00

1.00

Sqm

447.41

31.00
92.00
413.00

1.00
1.00
1.00

Nos
Nos
Sqm

62.00
184.00
634.99

Each
Rate per

1 Sqm

1994.05
1296.90
337269598.xlsx Bld data-13-14

Page 3034 of 3205

337269598.xlsx Bld data-13-14

Page 3035 of 3205

nk with Double layer approved brand & manufacture with cover and
s but without fittings & base support for tanks
6.00
1.00

1 Kg

6.00
0.40
6.40
0.90
7.30
0.00
0.00
7.30

14%

35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm


centre including fixing with 4 Nos of MS Z holdfasts (2 on each side)
ate with one coat of red oxide primer including cost and conveyance
ing all operational charges and all labour charges etc., complete for

1.50

4.00
3.00
2.00
9.00 Rmt
4.00 Kg/Rmt
3.00
2.60 Kg/Rmt

21.00 Rmt
21.00 Rmt
1.13 Kg/Rmt
0.450 Sqm
15.70 Kg/Sqm

2.625 Sqm

36.00 Kgs
7.80 Kgs
43.80 Kgs

23.73 Kgs
7.07 Kgs
74.60 Kgs

337269598.xlsx Bld data-13-14

Page 3036 of 3205


43.00
43.00
48.00
20.00
4.00
421.82
84.00
164.00

1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
10 Sqm
1 No
1 No

14%

Rs.

1883.40
1020.39
339.12
1491.90
298.38
110.73
84.00
164.00
5227.92
731.91
5959.83
0.00
0.00
5959.83
2270.00
5959.83
80.00

Doors, Windows etc, including cost and conveyance of all material ,


43.00

1 Kg

43.00

25.00
28.00
5.60

1000 Kg
1 Kg
1 Kg

0.03
28.00
5.60
76.63
10.73
87.36
0.00
0.00
87.36

Rs

undations in loamy, clayey soils like Black cotton soils and ordinary
ations, incidental, labour charges, hire charges of machinery, augur
es of following diameters -

280.00

1 day

147.28
29.46
24.74
201.48
0.00
0.00
201.48

undations in loamy, clayey soils like Black cotton soils and ordinary
ations, incidental, labour charges, hire charges of machinery, augur
es of following diameters -

337269598.xlsx Bld data-13-14

Page 3037 of 3205

280.00

1 day

176.68
35.34
29.68
241.70
0.00
0.00
241.70

yey soils like Black cotton soils and ordinary soils with Augoring and
ns, incidental, labour charges, hire charges of machinery, augur bore
following diameters.

280.00

1 Day

156.80
31.36
26.34
214.50
0.00
0.00
214.50

280.00

1 Day

220.92
44.18
37.11
302.22
0.00
0.00
302.22

280.00

1 Day

276.08
55.22
46.38
377.68
0.00
0.00
377.68

l and labour charges etc., complete for fixing it to the septic tank for
383.00

3 Rmt

127.67

337269598.xlsx Bld data-13-14

Page 3038 of 3205


127.67
15.00
14.00
50.00

1 Rmt
1 Each
1 Each
1 Rmt

1915.05
15.00
140.00
750.00

150.00
2970.05
198.00
27.72
3195.77
0.00
0.00
3195.77

PHOENIX or equivalent high strength Cement Concrete interlocking


colour pigmentation with imported colours and white cement to get
lause 1504 MORD

392.00
448.00

1 day
1 day

7056
3584

624

1 hour

1248

606

1 sqm

136350

231.41
627.11

1m
1 cum

27769.2
4534.01

100

1 kl

300
180841.21
25317.77
206158.98
0
0
206158.98
916.26

150 mm or any other shape can also be used and their cost shall be

4510.84
4510.84

1 Cum

202.99
28.42
231.41
0
0
231.41

337269598.xlsx Bld data-13-14

Page 3039 of 3205

with 8 mm thick mirror polished granite tiles length equal to flooring


tency spread at the rate of 3.30 kgs per sqm and jointed with white
aterials like tiles, cement, sand and water etc., complete including

933.00
727.11
5.50
5.50
27.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

9796.5
87.25
316.8
181.5
135

490.00
392.00
392.00

1 day
1 day
1 day

1029
313.6
1920.8
137.8
13918.25
1948.56
15866.81
0
0
15866.81
15866.85

337269598.xlsx Bld data-13-14

Page 3040 of 3205

th vitrified tiles length equal to flooring stones, set over base coat of
kgs per sqm and jointed with white cement paste mixed with pigment
ater etc., complete including seigniorage charges, etc., complete for

1225.00
727.11
5.50
5.50
27.00

1 sqm
1 cum
1 kgs
1 kgs
1 kgs

12862.5
87.25
190.08
181.5
54

490.00
392.00
392.00

1 day
1 day
1 day

470.4
878.08
1293.6
160.17
16177.58
2264.86
18442.44
0
0
18442.44
18442.45

teel powder coated (base steel as per IS 513, galvanised as per IS


with pure polyester powder of 50-60 microns thick with total coated
m to accommodate 35 mm thick door shutter, with groove to insert
ined by way of welding, each frame provided with: a) 2mm thick MS
ter. b) CRCA electroplates stiffeners of 6 Nos. 3 in each vertical. c)
ylon Aldrop Receiver 1 No. for single shutter frame. e)Tie Rod 1

656.00

1 Rmt

656
91.84
747.84
0
0
747.84
747.85

ES. Supply and fixing of windows & top Hung and fixed louvered
galvanized as per IS 277 with zinc of 120 GSM) primer coated with
ck and back coated with 5-7 microns thick alkyd backer. Section for
on should be 46 x 70 mm, and section for beading should be 18 x 25
hould be panelled with 5mm thick plain float glass & 4 mm pinhead
e to be cut to length mitre joined with corner brocket centre mullions
nylon receiver. Gaskets made of Ethyl propylene Diamine monomer
ss filled nylon. The above frames should be fixed to the concrete
pitch complete for finished item of work.

5145

1 Sqm

5145

720.3
337269598.xlsx Bld data-13-14

Page 3041 of 3205

Rs

5865.3
0
0
5865.3

337269598.xlsx Bld data-13-14

Page 3042 of 3205

th all round U section size of 20mm x 18mm x 20mm made from


shutter with 30mm x 20mm x 30mm stepped lipping with necessary
m long aldrops 2nos, MS powder coated 125mm long grip handle, 2
ges etc., complete finished item of work.

2593

1 Sqm

2593
363.02
2956.02
0
0
2956.02

e of Pre-painted Steel / Powder coated (Base steel as per IS 513 of


0.72 mm and the glass holding section made of 304 grade stainless
ted steel powder coated sections as per the design requirement &
f 5 7 microns thick, finish painted with a polyester paint of 12-16
olyester powder up to 50-60 microns thick and the vertical section of
ner section of 48 mm x 98 mm x 1 mm, cover profiles sections of 20
ding fixing 5mm thick Ocean Blue reflective glass, brackets made of
erticals at top & bottom as per site requirement and gasket made of
masonry wall with self-expanding cap & screws inclusive of cost and
umables etc. and scaffolding charges, form work etc. complete for

6300

1 Sqm

6300
882
7182
0
0
7182.00

with 30mm thick flush shutter with bondwood solid Block Board Type
like hinges, tower bolts and locking arrangement etc., and labour

435.00

1 No

771.00

1 Sqmt

435.00
1147.25

31.00
81.00
92.00
54.00
112.00
54.00
341.00

1 No
100 No
1 No
100 No
1 No
100 No
1 No

62.00
12.96
184.00
8.64
112.00
2.16
341.00

12.00

1 set

72.00

1 cum
1 set

43.69
80.00

48543.00
10.00

337269598.xlsx Bld data-13-14

Page 3043 of 3205


295.00

1 Sqmt

438.96

438.96

1 Sqmt

87.80
3027.46
423.85
3451.31
0
0
3451.31

337269598.xlsx Bld data-13-14

Page 3044 of 3205

with 30mm thick flush shutter with bondwood solid Block Board Type
like hinges, tower bolts and locking arrangement etc., and labour

420.00

1 No

420.00

771.00

1 Sqmt

925.20

31.00
81.00
92.00
54.00
112.00
54.00
341.00

1 No
100 No
1 No
100 No
1 No
100 No
1 No

62.00
12.96
92.00
4.32
224.00
4.32
341.00

12.00

1 set

72.00

1 cum

32.77

1 set

60.00

48543.00
10.00

295.00

1 Sqmt

354.00

438.96

1 Sqmt

87.80
2692.37
376.94
3069.31
0
0
3069.31

337269598.xlsx Bld data-13-14

Page 3045 of 3205

WARANGAL MUNICIPAL CORPORATION

Detailed Project Report of Ambedkar nagar & Jitendar nagar Slums in Waranagal Municipal Corporation under Rajiv Awas Yojana (Pilo

Drilling of Bore well and fitted with Mark - II Hand Pumps


DETAILED AND ABSTRACT ESTIMATE

S.N

Description

Nos

Drilling of Bore well

Drilling of Bore well by down the hole hammer (DTH) drilling to finished dia of 163 mm in all
formations to the depth specified and reaming the bores to the required dia flushing the bore walls at
an average pressure of 7 kg/cm2 (100 PSI) conducting yield test, inclusive of transportation from
point to point, crew charges, cost of consumables, shifting of Rig and all other charges etc,.The bore
wells should be true & vertical and work should be carried out to the satisfaction of the department
and carried out as per IS 2800 I & II / 1979 and amendments if any from time to time, the rate is
including all taxes etc,. complete as applicable.

Deppth of the Borewells ( Avg,Dpth)


Point No.1to 6 - up to 90.00m depth
above 90.00m depth
Supplying and fixing of 160mm dia PVC Casing pipe of 6kg/cm2 including cost and conveyance, all
labour charges and central excise duty and sales tax .

Qty

1
1

x
x

6
6

40mm dia suction pipe


Supply delivery of Mark - II Hand Pumps including cost and conveyance materials, transportation,
and all labour charges etc., completed.

a
5

Mark - II Hand Pumps


Supply delivery of Mark - II Cylinders with bross spares, including all cost and conveyance materials,
and all labour charges etc., completed.

Mark - II Hand Pumps

Deppth of the casing as per Geologist report


Point No.1 to 6
3

190

90.00
100.00

540.00
600.00

16.00

96.00
96.00

Manufacture, supply, & delivery of 16Kg/Sqcm HDPE pipes conforming to IS 4984 - 1995 including
transportation to any where in A.P, excise duty, sale tax etc., complete.

Borewells-Hand pump

190.00

1140.00

Page 3046 of 3205

S.N

Description

Nos

Fixing of Mark - II, hand pumps including fixing of pipes, connecting rods cylinders, and all materials,
including all labour charges etc., completed.

a
7

Mark - II Hand Pumps


Construction of Platforms with 900mm well Rings of 250mm high and flooring with CC(1:2:4) 75mm
thick over a bed of sand filling, 100mm thick, including cost of materials, and all labour charges etc.,
completed.

Mark - II Hand Pumps

Borewells-Hand pump

Qty

Page 3047 of 3205

na (Pilot Project 1)

Qty

Rate

Per

Amount

Rate as per RCRWS-RR


Dist.2011-12

Rmt
Rmt

305.00
335.50

1 Rmt
1 Rmt

164700.00
201300.00

1 Rmt

50190.00

data-bore wells-5

Rmt

522.81
data-bore wells4.b

Rmt

112.97

1 Rmt

128786.00

Nos

3750.00

1 Nos

22500.00

Nos

1200.00

1 Nos

7200.00

Borewells-Hand pump

Page 3048 of 3205

Qty

Rate

Per

Amount

Nos

500.00

1 Nos

3000.00

Nos

350.00

1 Nos

2100.00
579776.00
5.80 Lakhs

Say Rs.

Borewells-Hand pump

REC - CONSTRUCTION STANDARD SPECIFICATION No. F3 & F4/1993

COST DATA FOR ERECTION OF 100 KVA - 11 KV/433 V CSP CRGO TRANSFORMER

S. No.
1

Particulars

Cost of Material (Rs.)

11 KV/433 V 100 KVA CSP CRGO


TRANSFORMER (Aluminium)
Erection of 11 KV AB Switch (200A)

D.P. Structure

Erection of 11 K.V. H.G. Fuse set

Installation of L.T.H.G. Fuse sets including


connections

0.00

Labour & Transport (Rs.)


2,906

7,610

1,789

12,646

14,010

2,420

624

880

440

L.T. Metering arrangement with CTs including cable


connections and cleat arrangement

8,717

825

Installation of HT Lightening Arresters

1,116

508

C.I. Pipe earthing (3 Nos.)

12,177

4,680

Total Cost of Material

45,566

25,782

3% Storage & handling charges

4,913

3% Contingencies on Materials

4,913

Labour & Transport

25,782

Service Tax at 12.36% on L&T

3,187

10% Estt. & General charges on Materials

16,377

Total Cost in Rs.


Or Say

34

100,738
100,738

REC - CONSTRUCTION STANDARD SPECIFICATION No. F3 & F4/1981


COST DATA FOR ERECTION OF 63 KVA - 11 KV/433 V CSP TRANSFORMER
S. No.

Particulars

11 KV/433 V 63 KVA CSP Distribution Transformer

Erection of 11 KV AB Switch (200A)

D.P. Structure

Erection of 11 K.V. H.G. Fuse set

Installation of L.T.H.G. Fuse sets including


connections
Metering arrangement with CTs including cable
connections and cleat arrangement

Cost of Material (Rs.)

Installation of HT Lightening Arresters

C.I. Pipe earthing (3 Nos.)


Total Cost of Material

Labour & Transport (Rs.)


0

2,906

7,610

1,789

12,646

14,010

2,420

624

880

440

8,717

825

1,116

508

12,177

4,680

45,566

3% Storage & handling charges

4,174

3% Contingencies on Materials

4,174

Labour & Transport

25,782

Service Tax at 12.36% on L&T

3,187

10% Estt. & General charges on Materials

13,912

Total Cost in Rs.


Or say

34

96,795
96,795

25,782

REC - CONSTRUCTION STANDARD SPECIFICATION No. F3 & F4/1981


COST DATA FOR ERECTION OF 63 KVA - 11 KV/433 V CRGO CORE TRANSFORMER
S. No.
1

Particulars

Cost of Material (Rs.)

Labour & Transport (Rs.)

11 KV/433 V 63 KVA CRGO Core Distribution


Transformer (Aluminium)
Erection of 11 KV AB Switch (200A)

Plinth for distribution transformer

13,200

Erection of 11 K.V. H.G. Fuse set

2,420

624

Installation of L.T.H.G. Fuse sets including


connections
L.T. Metering arrangement with CTs including cable
connections and cleat arrangement

880

440

8,717

825

1,116

508

12,177

4,680

Installation of HT Lightening Arresters

C.I. Pipe earthing (3 Nos.)


Total Cost of Material

2,906

7,610

1,789

32,920

3% Storage & handling charges

3,794

3% Contingencies on Materials

3,794

Labour & Transport

24,972

Service Tax at 12.36% on L&T

3,087

10% Estt. & General charges on Materials

12,648

Total Cost in Rs.


Or say

34

81,215
81,215

24,972

REC - CONSTRUCTION STANDARD SPECIFICATION No. F3 & F4/1981


COST DATA FOR ERECTION OF 63 KVA - 11 KV/433 V CRGO CORE TRANSFORMER
S. No.

Particulars

Cost of Material (Rs.)

11 KV/433 V 63 KVA CSP CRGO Core Distribution


Transformer (Aluminium)

Labour & Transport (Rs.)


0

2,906

Erection of 11 KV AB Switch (200A)

7,610

1,789

Erection of structure for mounting of transformer

4,670

863

Erection of 11 K.V. H.G. Fuse set

2,420

624

Installation of L.T.H.G. Fuse sets including


connections
L.T. Metering arrangement with CTs including cable
connections and cleat arrangement

880

440

8,717

825

1,116

508

12,177

4,680

Installation of HT Lightening Arresters

C.I. Pipe earthing (3 Nos.)


Total Cost of Material

37,590

3% Storage & handling charges

3,934

3% Contingencies on Materials

3,934

Labour & Transport

12,635

Service Tax at 12.36% on L&T

1,562

10% Estt. & General charges on Materials

13,115

Total Cost in Rs.


Or say

34

72,770
72,770

12,635

REC - CONSTRUCTION STANDARD SPECIFICATION No. F3 & F4/1981


COST DATA FOR ERECTION OF 100 KVA - 11 KV/433 V
CSP CRGO CORE TRANSFORMER
S. No.

Particulars

Cost of Material (Rs.)

11 KV/433 V 100 KVA CSP CRGO Core


Distribution Transformer (Aluminium)

Erection of 11 KV AB Switch (200A)

Construction of column type plinth 4'x4'x6'' footing


and 4'x4'x6'' platform over 1'x9'' column of 9'
height.

Erection of 11 K.V. H.G. Fuse set

Installation of L.T.H.G. Fuse sets including


connections
L.T. Metering arrangement with CTs including cable
connections and cleat arrangement

7
8

Installation of HT Lightening Arresters with earth


connection
C.I. Pipe earthing (3 Nos.)
Total Cost of Material

Labour & Transport (Rs.)


0

2,906

7,610

1,789

11,157

2,420

624

880

440

8,717

825

1,116

508

12,177

4,680

32,920

3% Storage & handling charges

4,534

3% Contingencies on Materials

4,534

Labour & Transport

22,930

Service Tax at 12.36% on L&T

2,834

10% Estt. & General charges on Materials

15,112

Total Cost in Rs.


Or say

34

201,065
201,065

22,929

Design of Pumpsets (Prospective) (Average)


Inlet at Screen Chamber
Bed of Intake Well
Static Head =
Discharge =
Frictional losses =
Total Head =

111.50
97.50
111.50- 97.50
5.45MLD
(or)
2.000 m
= 14.00 + 2.000

= 14.00 m
65.82

=16.000m
say =16.0m
Q x H/( 102 )

Total power required in kW =


Where
Q is discharge in LPS
H is total head in M
is efficiency of pumps
75 %
Capacity of pumps =
65.82 x 16.0
102 x 0.75
=
Hence Provide

13.77 KW
18.46 HP
20 HP -1 Nos

(or)

pumpsets with a duty of


and a head of =16.0m

each

ective) (Average)

LPS

ith a duty of

4400 lpm each

WORK SLIP

Name of the Work: Wanaparthy Municipality UIDSSMT Manufacture, Supply, Delivery, Erection, Testing and Commissioning of V.T. Pumps for Raw Water & Clear Water and appurtenant works in various plac
Wanaparthy Municipality.

Sl.
No.

As per Original Estimate

Description of Work
Qty.

Rate

Work Already Executed

Amount

Work to b

Qty.

Rate

Amount

Qty.

A) Manufacture, supply, delivery, erection, testing and commissioning of V.T. pumps


for Raw Water and appurtenant works to pump water from Intake well at Ramanpad.

Supply, delivery, erection of water lubricating type Vertical Turbine Pump electrical driven
capable to Discharge 78 LPS/4680 LPM at a total head of 44 meters make
M&M/M&P/Flowmore/ Jyoti/Kirloskar or any other make having ISO 9001 certification with
requires column assembly fitted with bronze impellers complete with water lubrication
system, bell mouth strainer, suitable base plate including cost of material, duties, labour
excluding VAT Complete (2+1 stand by system) column length 10 Mtrs.

3 Nos.

519330

1,557,990.00

--

--

--

3 Nos.

Supply, delivery of 55 KW/75hp Vertical solid shaft squirrel cage induction motor, A.C.
power supply 1500 (syn Rpm) suitable for the above VT pumps including cost of materials,
duties, labour charges and all other incidental charges, excluding VAT. Make:
ABB/Cromptom/GEC/Jyothi or any other make of ISO 9001 Certification.

3 Nos.

262000

786,000.00

--

--

--

3 Nos.

Supply, delivery of mounting base over MS Girder suitable to lay on jack well to mount the
pumps, including the cost of materials, duties, labour charges and all other incidental
charges, excluding VAT. Complete as directed excluding VAT.

3 Nos.

122000

36,600.00

3 Nos.

Supply, delivery of 50 sqmm 31/2 core PVC insulated aluminum armored cable starter to
motor including cost of materials, duties, labour and all other incidental charges, excluding
VAT.

60 Mts

370

22,200.00

--

352000

352,000.00

1 No.

Manufacturing and supply of control panel board with 400 Amps capacity bus bar suitable to
operate 3 pump sets. The accessories all are internally Wired and necessary earthling terminations.
The panel board is made of 16 gauge MS sheet metal Cubical/industrial indoor type and duly
painted with 2 coats enamel paint with cost of materials as follow conveyance, duties, labour
charges and all other incidentals, excluding VAT.
a) 400A capacity MCCB for incoming supply manual operated, 3pole.Thermal
magnetic O/L and E/F releases. --- 1No.
b) Fully automatic Air Break type star delta starters L&t/Schnieder/BCH. --- 3 Nos.
c) 160 Amps MCCB for starter controlling. --- 3Nos.
d) 6x10KVAR capacitor bank.---- 1 No. HRC fuses for capacitor control. --- 3 Nos
e) 63Amps TPN switch HRC type with
f) 0-500 V Electronic Volt meter with selector switch with C.T.Coils to read allphases 1 No.
g) 0-400Amp Electronic Ammeter with selector switch. --- 1 No.
h) 0-150Amp Manual Ammeter for each individual Motor reading.--- 3Nos.
i) 63 Amps TPN switch HRC type for spare/Lighting. ---- 1 Nos
j) Hour meter Electric/Electronic 5 digit magnetic counter to read number of
hours the pumps worked--- 3 Nos
k) RYB Push buttons with RGY for start & stop for Pumps. --- 6 Nos.
l) RYB Phase indicating of incoming supply.--- 3 Nos.

1 No.

3056

12200

--

366,000.00

--

352000

352,000.00

--

60 Mts

--

Supply, laying and fixing of 40x 6mm GI Flat Patti Double earthling for electrical protection
for motor pump and panel board efficiently earthed duly providing earth pits and filling coal
and salt and GI Pipe 1 x6 long and bottom 2x2 G.I plate wielded as per IE rules and
specifications with cost of materials, conveyance, duties, labour charges and providing 1
x 1 earth pit chamber with brick masoning with top cover excluding VAT.

3 Nos.

8000

24,000.00

--

Supply, delivery of 3 Ton capacity chain pully block with moving trolley suitable to mount on
top Girders to handle pump & motor in the pump house, including cost of material,
conveyance, duties, labour charges and all other incidental charges excluding VAT.

1 No.

56000

56,000.00

1 No.

Supply, delivery of 250mm dia CI/DF Non return valve heavy duty with cost and
conveyance of valve Jointing materials viz. Bolts & Nuts, washers and Gasket inclusive of
all other duties, Labour charges Incidental charges excluding VAT.

3 No.

19400

58,200.00

Supply, delivery and fixing of 250mm dia CI/DF Sluice valve heavy duty with cost,
conveyance of valve. Jointing materials viz. Bolts & nuts washers, and gaskets inclusive of
duties, labour charges, incidentals charges, excluding VAT.

3 No.

19900

10

Supply and fixing of Air cushion valve of 100mm dia as per AWWA including cost and
conveyance of materials, labour charges, duties, excluding VAT.

1 No.

11

12

13

Supply and delivery of necessary and suitable erection tools excluding VAT.
a) Ring spanner set 3/16 to 1
-- 1No
b) Double end spanner set 3/16 to 1 --1No
c) Pipe wrench 18 & 4 -- 2 Nos
d) Screw drivers 6, 10& 12 3 Nos.
e) Cutting plier 12 1No.
f) 2 kgs Hammer with handle. 1No.
g) Nose plier.1 No.
h) Flat & Half roung smooth file.2Nos.
i) Adjustable spanner6. 1No.
j) Gland tightening spanner. 1 No.
.k) Grease gun- 1No.

Supply and delivery of necessary safety equipments as per IE rules excluding VAT.
a) Fire Extinguishers 2 kg capacity Co2 -- 2Nos.
b) Rubber matt 6x4. 2 Nos.
c) Fire buckets with stand and three buckets1No.
d) Rubber hand gloves.1 Set.
e) Danger board plates. 4Nos.
f) First aid lit with chart.1No.
g) Shock treatment chart. 1No.
h) Portable rechargeable torch light.1No.

Supply, delivery of 185 sqmm PVC insulated Aluminum armored 31/2 core cable for
incoming Supply from transformer to panel board excluding VAT.

--

--

56000

56,000.00

--

3 No.

19400

58,200.00

--

59,700.00

3 No.

19900

59,700.00

--

44400

44,400.00

--

--

--

1 No.

1 Set

26000

26,000.00

--

--

--

1 Set

1 Set

22500

22,500.00

--

--

--

1 Set

950

57,000.00

--

--

--

--

60 Mts
3057

--

14

Fabrication & fixing of 600 mm dia MS barrel Manifold of 4 Mtrs fabricated with 10mm thick
MS sheet and providing 3 Nos delivery connecting vents including cost of MS plate,
fabrication charges, wielding and transportation charges and two coats of anti corrosive
epoxy black paint and all other incidentals excluding VAT.

660 Kg

46

30,360.00

--

--

--

--

15

Manufacture, supply, delivery of 250mm dia MS pipe for delivery connection including cost
of MS plate with 10mm thick fabrication, wielding charges painting with 3 coats of epoxy 1920 Kg
paint, transportation charges, excluding VAT.

46

88,320.00

--

--

--

400 Kg

16

Manufacture, supply, delivery of MS flanges 250mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, nuts bolts & washers, packing, wielding
charges, transportation charges etc. excluding VAT.

20 Nos.

1963

39,260.00

--

--

--

9 Nos.

17

Supply, delivery of 240 sqmm PVC insulated Aluminum armored 31/2 core cable for
incoming Supply from transformer to panel board excluding VAT.

--

--

--

--

--

--

60 Mts

18

Fabrication & fixing of 600 mm dia MS barrel Manifold of 6 Mtrs fabricated with 10mm thick
MS sheet and providing 3 Nos delivery connecting vents including cost of MS plate,
fabrication charges, wielding and transportation charges and two coats of anti corrosive
epoxy black paint and all other incidentals excluding VAT.

--

--

--

--

--

--

490 Kg

19

Manufacture, supply, delivery of 400mm dia MS pipe for pressure main connection
including cost of MS plate with 10mm thick fabrication, wielding charges painting with 3
coats of epoxy paint, transportation charges, excluding VAT.

--

--

--

--

--

--

12 Mts

20

Manufacture, supply, delivery of 600 x 400 x 300 MS-Y special. 1no.

--

--

--

--

--

--

1 No.

21

Manufacture, supply, delivery of 600 mm MS dummy plate 1 no.

--

--

--

--

--

--

1 No.

B) Manufacture, supply, delivery, erection, testing and commissioning of Clear Water


pumping plant with appurtenant works for pumping water to Yerragattu.

--

--

--

--

--

--

--

22

Supply, delivery, installation, testing and commissioning of 37 KW/50 HP Volts 1500 rpm
(Syn) Phase 50 Hz, TEFC Horizontal Foot mounted squirrel cage induction motor of
Kirloskar/Crompton/GEC/Alsthom/Jyothi /ABB or its equivalent standard make with cost
and conveyance, duties services, labour charges and all other incidental charges,
excluding VAT.

3 Nos.

148200

444,600.00

3 Nos.

148200

444,600.00

--

23

Supply, delivery, erecting, testing and commissioning of Horizontal split casing centrifugal
pumps of Kirloskar/Mather & Platt or its equivalent standard make to discharge 45.5 Lps
head of 43 mtrs with standard CI construction with bronze impeller and pressure gauges &
Vacuum gauges siphon and cock, cost and conveyance of material including, duties,
services, labour charges and all other incidental charges excluding VAT.

3 Nos.

114400

343,200.00

3 Nos.

114400

343,200.00

--

3058

24

25

26

Fabrication, supply and erection of common base frame made of MS heavy duty channel to
accommodate above pump and motor with couplings and painted with anticorrosive red
oxide and enamel paint with cost and conveyance material duties, services, labour charges
and all other incidental charges excluding VAT.

Laying of cement concrete (1:2:4) prop bed blocks of 2m 1.5mm for the above pump and
motor including earth work excavation providing anti vibration paid duly embedding
with supply and fixing 6 nos. of foundation bolts with nuts and washers including cost and
conveyance, duties, services, labour charges and all other incidental charges exlcuidng
VAT.

Fabrication, supply, installation, testing and commissioning of suitable control panel board made of MS sheet metal cubicle
type to accommodate following equipment including supply and fixing and sufficiently earthed and duly applying hot
processing powder coating including providing connection with end termination with cost and conveyance, duties, services,
labour charges and all other incidental charges excluding VAT.
a) Fully automatic star delta starter, Air break type L&T/ BCH/ Schnieder or
equivalent make 3Nos.
b) 200 Amps TPN Switch fuse unit with HRC L&T/ Schnieder 1No
c) 3x10KVAR and 3x5 KVAR Power factor capacitor with control Switches. 1 Nos.
d) 150 amps TPN Switch fuse unit with HRC to control starters L&T/Schneider 3 Nos.
e) 0 500 Volts Voltmeter with selector switches 1 No.
f) 0 150A Ammeter with selector switch and C.I. Coils to read all phases 3 Nos.
g) 3 Phase indicating lamps R.Y.B. 3 Nos.
h) On and off, green and red push buttons with indicators 6 Nos.

3 Nos.

16500

49,500.00

3 Nos.

3 job

13000

39,000.00

--

1 No.

240000

240,000.00

1 No.

16500

--

49,500.00

--

--

3 job

240000

240,000.00

--

27

Supplying, laying, jointing of 120 sqmm 31/2 core aluminum armored PVC insulated cable
with end termination kit for incoming supply from AP Transco main supply to panel
including cost and conveyance, duties, services, labour charges and all other incidental
charges excluding VAT.

50 Rmt

750

37,500.00

50 Rmt

750

37,500.00

--

28

Supply, laying and jointing of 25 sq.mm 3 core PVC insulated Aluminium armoured cable
with end termination kits lying from motor to starter, partial under ground and above ground
duly encased with heavy duty rigid PVC pipe for cable protection as per Standard and
including cost and conveyance, duties, services, labour charges and all other incidental
charges but excluding VAT.

80 Rmt

235

18,800.00

80 Rmt

235

18,800.00

--

29

Supply and fixing of 40x6mm GI Flat patty double earthing for electrical protecting for motor
and pump and panel board efficiently earthed duly providing earth pits and filling with salt,
coal and G.I. 11/2x6 feet heavy duty G.I., Pipe as per standards relevant 10 IS
specifications providing 600x600x6 GI plate at bottom welded lowering into pit and filling
with cost and conveyance, duties, services, labour charges and all other incidental charges
but excluding VAT.

4 Nos.

8000

32,000.00

--

30

Supply, delivery and fixing of 250mm dia CI/DF sluice valve heavy duty with cost and
conveyance of valve, joining materials viz. Bolts, nuts, washers and packing including of
cost and conveyance, taxes, duties, services, labour charges and all other incidental
charges complete but excluding VAT.

3 Nos.

19900

59,700.00

3 Nos.

3059

--

--

19900

59,700.00

4 Nos.

--

31

Supply, delivery and fixing of 250mm dia. CI/DF non return valve heavy duty with cost and
conveyance of valve, jointing materials Viz. Bolts, buts, washers and gasket including of,
duties, services, labour charges and all other incidental changes complete but excluding
VAT.

3 Nos.

19400

58,200.00

3 Nos.

19400

58,200.00

--

32

Manufacture, supply, delivery of MS flanges 250mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, for delivery connecting main but excluding
VAT.

30 Nos.

1963

58,890.00

20 Nos.

1963

39,260.00

10 Nos.

33

Manufacture, supply delivery, fixing, testing of 2 Ton HOT travelling chain pulley trolley fixed
on the I Section in the Pump house duly arranging supports, alignment, Lowering at site by
field gas cutting and wielding to suit with necessary CC. Works including two coats of anti
Corrosive paint trial run with cost, and conveyance of materials services, labour charges,
hire charges and all incidental charges but excluding VAT.

1 lot

290000

290,000.00

1 lot

290000

290,000.00

--

34

Supply, delivery, erecting and fixing of 3 HP vaccum pump along with base plate,
foundation GI Specials, Ball Valves, connecting to pump and starter for operating for
priming the pump as per the site condition including all necessary items and cost of
materials, taxes, duties, services and other all incidental charges but excluding VAT.

1 No.

55400

55,400.00

1 No.

55400

55,400.00

--

1 No.

21000

21,000.00

--

--

--

1 No.

1 No.

22500

22,500.00

--

--

--

1 No.

35

36

Supply and delivery of necessary and suitable erection tools excluding VAT.
a) Ring spanner set 3/16 to 1
-- 1No
b) Double end spanner set 3/16 to 1 --1No
c) Pipe wrench 18 & 4 -- 2 Nos
d) Screw drivers 6, 10& 12 3 Nos.
e) Cutting plier 12 1No.
f) 2 kgs Hammer with handle. 1No.
g) Nose plier.1 No.
h) Flat & Half roung smooth file.2Nos.
i) Adjustable spanner6. 1No.
j) Gland tightening spanner. 1 No.
.k) Grease gun- 1No.

Supply and delivery of necessary safety equipments as per IE rules excluding VAT.
a) Fire Extinguishers 2 kg capacity Co2 -- 2Nos.
b) Rubber matt 6x4. 2 Nos.
c) Fire buckets with stand and three buckets1No.
d) Rubber hand gloves.1 Set.
e) Danger board plates. 4Nos.
f) First aid lit with chart.1No.
g) Shock treatment chart. 1No.
h) Portable rechargeable torch light.1No.

3060

37

Manufacture, supply, delivery of 250mm dia MS pipe including the cost of MS plate with
10mm thick, fabrication charges and wielding charges painting with three coats of epoxy
black paint and transportation charges for delivery connecting main but excluding VAT.

38

Manufacturers, supply and delivery of 500mm x 400mm reducer.

--

--

--

--

--

--

1 No.

39

Manufacture, supply, delivery of MS flanges 400mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, for delivery connecting main but excluding
VAT.

--

--

--

--

--

--

1 No.

40

Manufacture, supply, delivery of MS barrel manifold 500mm fabricated 10mm thick 12mts.
Long MS plate fabrication charges for delivery connecting main but excluding VAT.

--

--

--

--

--

--

1 No.

41

Supply and fixing of Air cushion valve of 100mm dia as per AWWA including cost and
conveyance of materials, labour charges, duties, excluding VAT.

--

--

--

--

--

--

1 No.

42

Manufacture, supply & fixing of 200x100mm MS gudders heavy.

--

--

--

--

--

--

18 Rmt

43

Manufacture, supply & delivery of 250x150 MS Tappers.

--

--

--

--

--

--

3 Nos.

44

Manufacture, supply & delivery of 250x100 MS Tappers.

--

--

--

--

--

--

3 Nos.

45

Manufacture, supply, delivery of 500 mm MS dummy plate 1 no.

--

--

--

--

--

--

1 No.

46

Manufacture, Supply, delivery of 250mm MS bends.

--

--

--

--

--

--

6 Nos.

47

Manufacture, supply, delivery of MS flanges 150mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, for delivery connecting main but excluding
VAT.

--

--

--

--

--

--

3 Nos.

48

Manufacture, supply, delivery of MS flanges 100mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, for delivery connecting main but excluding
VAT.

--

--

--

--

--

--

3 Nos.

c) Manufacture, supply, delivery, erection, testing and commissioning of Clear water


plant with appurtenant works for pumping water from Kothakotta to Gampagutta.

--

--

--

--

--

--

--

49

Supply, delivery, installation, testing and commissioning of 110 KW/150HP 1500 rpm 3
phase 50 Hz. TEFCHorizontal Foot mounted squirrel cage induction motor of
Kirloskar/Crompton/GEC/Alsthom/ Jyothi/ABB or its equivalent standard make with cost
and conveyance, duties, services, labour charges and all other incidental charges but
excluding VAT.

3 Nos.

462800

1,388,400.00

--

--

--

3 Nos.

50

Supply, delivery, erecting, testing, and commissioning of Horizontal split casing centrifugal
pumps of Kirloskar/Mather & Platt or its equivalent standard make to discharge 45.50 LPs
head of 134 mtrs with standard CI construction with bronze impeller and pressure gauges
& Vacuum gauges siphon and cock, cost and conveyance of material including, duties,
services, labour charges and all other incidental charges (2W + 1Stby) but excluding VAT.

3 Nos.

449000

1,347,000.00

3 Nos.

3463
Kg

3061

46

159,298.00

2400.00
Kg.

46

449000

110,400.00

1,347,000.00

--

--

51

Fabrication, supply and erection of common base frame made of MS heavy duty channel to
accommodate above pump and motor with couplings and painted with anticorrosive red
oxide and enamel paint with cost and conveyance material duties, services, labour charges
and all other incidental charges but excluding VAT.

3 Nos.

28000

84000

52

Laying of cement concrete (1:2:4) prop bed blocks for the above pump and motor including
earth work excavation providing anti vibration paid duly embedding with supply and fixing 6
nos. of foundation bolts with nuts and washers including cost and conveyance, duties,
services, labour charges and all other incidental charges but excluding VAT.

3 Job

21000

63,000.00

--

1 No.

540000

540,000.00

1 No.

53

Manufacturing and supply of control panel board with 800 Amps capacity bus bar suitable to operate 3 pump sets. The
accessories all are internally wired and necessary earthing terminations. The panel board is made of 16 gauge MS sheet
metal cubical/ industrial indoor type and duly Painted with 2 coats enamel paint with cost of materials as follow conveyance,
duties, labour charges and all other incidentals, excluding VAT.
a) 630A capacity fixed type ACB for incoming supply manual operated,
3pole.Thermal magnetic O/L and E/F releases. --- 1No.
b) Fully automatic Air Break type star delta starters L&t/Schnieder/BCH. --- 3 Nos.
c) 315 Amps TPN Switch for starter controlling. --- 3Nos.
d) 3x30KVAR and 3x 5 KVARcapacitor bank.---- 1 No.
e) 125Amps TPN switch HRC type with HRC fuses for capacitor control. --- 3 Nos
f) 0-500 V Electronic Volt meter with selector switch with C.T.Coils to read all
phases. --- 1 No.
g) 0-600Amp Electronic Ammeter with selector switch. --- 1 No.
h) 0-300Amp Manual Ammeter for each individual Motor reading.--- 3Nos.
i) 63 Amps TPN switch HRC type for spare/Lighting. ---- 2 Nos
j) KW/PF Electronic Meter--- 1 No.
k) Hour meter Electric/Electronic 5 digit magnetic counter to read number of
hours the pumps worked--- 3 Nos
l) RYB Push buttons with RGY for start & stop for Pumps. --- 6 Nos.
m) RYB Phase indicating of incoming supply.--- 3 Nos.

3 Nos.

54

Supply, laying and jointing of 120 sq.mm 3 core PVC insulated Aluminium armoured
cable with end termination kits lying from motor to starter, partial under ground and above
ground duly encased with heavy duty rigid PVC pipe for cable protection as per Standard
and including cost and conveyance, duties, services, labour charges and all other
incidental charges but excluding VAT.

80 Rmt

750

60,000.00

80 Rmt

55

Supply and fixing of 40x6mm GI Flat patty double earthing for electrical protecting for motor
and pump and panel board efficiently earthed duly providing earth pits and filling with salt,
coal and G.I. 11/2x6 feet heavy duty G.I., Pipe as per standards relevant 10 IS
specifications providing 600x600x6 GI plate at bottom welded lowering into pit and filling
with cost and conveyance, duties, services, labour charges and all other incidental charges
but excluding VAT.

4 Nos.

8000

32,000.00

--

56

Supply, delivery and fixing of 250mm dia PN1.6 CI/DF sluice valve heavy duty with cost
and conveyance of valve, joining materials viz. Bolts, nuts, washers and packing including
of cost and conveyance, taxes, duties, services, labour charges and all other incidental
charges complete but excluding VAT.

3 Nos.

19900

59,700.00

3 Nos.

3062

28000

--

84000

--

--

3 Job

540000

540,000.00

--

750

60,000.00

--

--

--

19900

59,700.00

4 Nos.

--

57

Supply, delivery and fixing of 250mm dia. PN 1.6 CI/DF non return valve heavy duty with
cost and conveyance of valve, jointing materials Viz. Bolts, buts, washers and gasket
including of, duties, services, labour charges and all other incidental changes complete but
excluding VAT.

3 Nos.

19400

58,200.00

3 Nos.

19400

58,200.00

--

58

Manufacture, supply, delivery of MS flanges 250mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, for delivery connecting main but excluding
VAT.

40 Nos.

1963

78,520.00

40 Nos.

1963

78,520.00

--

59

Supply and fixing of Air cushion valve of 200mm dia as per AWWA including cost and
conveyance, of matrials, labour charges, duties, but excluding VAT.

1 No.

71663

71,663.00

--

60

Manufacture, supply delivery, fixing, testing of 2 ton HOT travelling chain pulley trolley fixed
on the I section in the Pump house duly arranging supports, alignment, hoisting, Lowering
at site by field gas cutting and wielding to suit with necessary CC works including two coats
of anti Corrosive paint trial run with cost, and conveyance of materials services, labour
charges, hire charges and all incidental charges but excluding VAT.

1 Lot

290000

290,000.00

1 Lot

290000

290,000.00

--

61

Supply, delivery, erecting and fixing of 3 HP vaccum pump along with base plate,
foundation GI specials, Ball valves, connecting to pump and starter for operating for
priming the pump as per site condition including all necessary items and cost of mateials,
taxes, duties, services and other all incidental charges but excluding VAT.

1 No.

55400

55,400.00

1 No.

55400

55,400.00

--

1 Set

21000

21,000.00

--

--

--

1 Set

1 Set

22500

22,500.00

--

--

--

1 Set

62

63

Supply and delivery of necessary and suitable errection tools excluding VAT.
a) Ring spanner set 3/16 to 1
-- 1No
b) Double end spanner set 3/16 to 1 --1No
c) Pipe wrench 18 & 4 -- 2 Nos
d) Screw drivers 6, 10& 12 3 Nos.
e) Cutting plier 12 1No.
f) 2 kgs Hammer with handle. 1No.
g) Nose plier.1 No.
h) Flat & Half roung smooth file.2Nos.
i) Adjustable spanner6. 1No.
j) Gland tightening spanner. 1 No.
.k) Grease gun- 1No.

Supply and delivery of necessary safety equipments as per IE rules excluding VAT.
a) Fire Extinguishers 2 kg capacity Co2 -- 2Nos.
b) Rubber matt 6x4. 2 Nos.
c) Fire buckets with stand and three buckets1No.
d) Rubber hand gloves.1 Set.
e) Danger board plates. 4Nos.
f) First aid lit with chart.1No.
g) Shock treatment chart. 1No.
h) Portable rechargeable torch light.1No.

3063

--

--

1 No.

64

Manufacture, supply, delivery of 250mm dia MS pipe including the cost of MS plate with
10mm thick, fabrication charges and wielding charges painting with three coats of epoxy 3463 Kg.
black paint and transportation charges for delivery connecting main but excluding VAT.

46

159,298.00

2400

65

Fabriation & fixing of 1000 mm dia MS barrel Manifold of 5 mtrs fabricated with 10mm thick
MS sheet and providing 3 Nos delivery connecting vents including cost of MS plate,
1562 Kg
fabrication charges, weilding and transportation chrges and two coats of anti corrosive
epoxy black paint and all other incidentals but excluding VAT.

46

71,852.00

--

66

Supplying, laying, jointing of 240 sqmm 31/2 core aluminum armored PVC insulated cable
with end termination kit for incoming supply from AP Transco main supply to panel
100 Rmt
including cost and conveyance, duties, services, labour charges and all other incidental
charges excluding VAT.

1520

152,000.00

100 Rmt

67

Fabriation & fixing of 1000 mm dia MS barrel Manifold of 9 mtrs fabricated with 10mm thick
MS sheet and providing 3 Nos delivery connecting vents including cost of MS plate,
fabrication charges, weilding and transportation chrges and two coats of anti corrosive
epoxy black paint and all other incidentals but excluding VAT.

68

Manufacturers, supply and delivery of 250mm MS long bends.

--

--

--

--

--

--

6 Nos.

69

Manufacture, supply, delivery of MS flanges 400mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, for delivery connecting main but excluding
VAT.

--

--

--

--

--

--

1 No.

70

Manufacture, supply, delivery of 200 x 250mm MS tappers.

--

--

--

--

--

--

3 Nos.

71

Manufacture, supply and delivery of 400 mm MS long bends.

--

--

--

--

--

--

2 Nos.

72

Manufacture, supply, delivery of 150 x 250mm MS tappers.

--

--

--

--

--

--

3 Nos.

73

Manufacture, supply & fixing of 250x125mm MS gudders heavy.

--

--

--

--

--

--

18 Rmt.

74

Manufacture, supply, delivery of 1000 mm MS dummy plate 1 no.

--

--

--

--

--

--

1 No.

75

Manufacture, supply, delivery of MS flanges 200mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, for delivery connecting main but excluding
VAT.

--

--

--

--

--

--

3 Nos.

76

Manufacture, supply, delivery of MS flanges 150mm dia with 20mm thick MS plate
including cost of MS plate fabrication charges, for delivery connecting main but excluding
VAT.

--

--

--

--

--

--

3 Nos.

77

Manufacture, supply, delivery and fixing of 350 MS gudders

46

--

110,400.00

--

1520

--

--

152,000.00 100 Rmt

2812 kg

66 mtrs

3064

78

Manufacture, supply, delivery and fixing of 350 MS Chaker plates

18 Sqm

79

Manufacture, supply, delivery and fixing of 75 mm x 75mm anglars

48 mtrs

TOTAL

9,744,651.00

VAT
UNFURTUNATE ITEMES
Insurance charges
Technical persons
Estimate Amount

275650.00
100699.00

10,121,000.00
10% Less T.P.
Agreement Value

10121000 ( - )
1012100
9,108,900.00
Workdone - agreement
Estimate

3065

WORK SLIP

ear Water and appurtenant works in various places of

Work to be done
Rate

Total Value of Work


Amount

Qty.

Rate

Differences

Amount

Remarks

Excess

Less

519330

1,557,990.00

3 Nos.

519330

1,557,990.00

--

--

with in the limits

262000

786,000.00

3 Nos.

262000

786,000.00

--

--

with in the limits

--

3 Nos.

122000

36,600.00

--

--

with in the limits

60 Mts

370

22,200.00

--

--

with in the limits

352000

352,000.00

--

--

with in the limits

--

370

--

22,200.00

--

1 No.

3066

--

--

3 Nos.

8000

24,000.00

--

--

with in the limits

--

--

1 No.

56000

56,000.00

--

--

with in the limits

--

--

3 No.

19400

58,200.00

--

--

with in the limits

--

--

3 No.

19900

59,700.00

--

--

with in the limits

--

44400

44,400.00

1 No.

44400

44,400.00

--

--

with in the limits

26000

26,000.00

1 Set

26000

26,000.00

--

--

with in the limits

22500

22,500.00

1 Set

22500

22,500.00

--

--

with in the limits

--

57,000.00

with in the limits

--

--

--

-3067

--

--

--

--

--

--

30,360.00

with in the limits

46

18,400.00

400 Kg

46

18,400.00

--

69,920.00

with in the limits

1963

17,667.00

9 Nos.

1963

17,667.00

--

21,593.00

with in the limits

1520

91,200.00

60 Mts

1520

91,200.00

91,200.00

--

distance from transeformer to panel


board have incresed, cable size
also changed

46

45,540.00

490 Kg

46

45,540.00

45,540.00

--

2 mts. of excess length used as per


site condition

8000

96,000.00

12 Mts

8000

96,000.00

96,000.00

--

As per site conditions.

19500

19,500.00

1 No.

19500

19,500.00

19,500.00

--

As per site conditions.

7900

7,900.00

1 No.

7900

7,900.00

7,900.00

--

As per site conditions.

--

--

--

--

--

3 Nos.

--

--

3 Nos.

--

--

--

--

with in the limits

148200

444,600.00

--

--

with in the limits

114400

343,200.00

--

--

with in the limits

3068

--

--

13000

39,000.00

3 Nos.

16500

49,500.00

--

--

with in the limits

3 job

13000

39,000.00

--

--

with in the limits

240000

240,000.00

--

--

with in the limits

--

--

1 No.

--

--

50 Rmt

750

37,500.00

--

--

with in the limits

--

--

80 Rmt

235

18,800.00

--

--

with in the limits

4 Nos.

8000

32,000.00

--

--

with in the limits

3 Nos.

19900

59,700.00

--

--

with in the limits

8000

--

32,000.00

--

3069

--

--

1963

3 Nos.

19400

58,200.00

--

--

with in the limits

19,630.00 30 Nos.

1963

58,890.00

--

--

with in the limits

--

--

1 lot

290000

290,000.00

--

--

with in the limits

--

--

1 No.

55400

55,400.00

--

--

with in the limits

21000

21,000.00

1 No.

21000

21,000.00

--

--

with in the limits

22500

22,500.00

1 No.

22500

22,500.00

--

--

with in the limits

3070

--

2400.00
Kg.

--

46

110,400.00

--

48,898.00

with in the limits

12000

12,000.00

1 No.

12000

12,000.00

12,000.00

--

As per site conditions.

7500

7,500.00

1 No.

7500

7,500.00

7,500.00

--

As per site conditions.

119000

119,000.00

1 No.

119000

119,000.00

119,000.00

--

since not included in the Estimate

44400

44,400.00

1 No.

44400

44,400.00

44,400.00

--

since not included in the Estimate

4900

88,200.00

18 Rmt

4900

88,200.00

88,200.00

--

since not included in the Estimate

9900

29,700.00

3 Nos.

9900

29,700.00

29,700.00

--

since not included in the Estimate

10200

30,600.00

3 Nos.

10200

30,600.00

30,600.00

--

since not included in the Estimate

7000

7,000.00

1 No.

7000

7,000.00

7,000.00

--

since not included in the Estimate

9000

54,000.00

6 Nos.

9000

54,000.00

54,000.00

--

since not included in the Estimate

1500

4,500.00

3 Nos.

1500

4,500.00

4,500.00

--

since not included in the Estimate

1200

3,600.00

3 Nos.

1200

3,600.00

3,600.00

--

since not included in the Estimate

--

--

--

462800

--

--

1,388,400.00

--

--

--

--

3 Nos.

462800

1,388,400.00

--

--

with in the limits

3 Nos.

449000

1,347,000.00

--

--

with in the limits

3071

--

--

21000

63,000.00

3 Nos.

28000

84000

--

--

with in the limits

3 Job

21000

63,000.00

--

--

with in the limits

540000

540,000.00

--

--

with in the limits

--

--

1 No.

--

--

80 Rmt

750

60,000.00

--

--

with in the limits

4 Nos.

8000

32,000.00

--

--

with in the limits

3 Nos.

19900

59,700.00

--

--

with in the limits

8000

--

32,000.00

--

3072

--

--

3 Nos.

19400

58,200.00

--

--

with in the limits

--

--

40 Nos.

1963

78,520.00

--

--

with in the limits

1 No.

71663

71,663.00

--

--

with in the limits

71663

71,663.00

--

--

1 Lot

290000

290,000.00

--

--

with in the limits

--

--

1 No.

55400

55,400.00

--

--

with in the limits

21000

21,000.00

1 Set

21000

21,000.00

--

--

with in the limits

22500

22,500.00

1 Set

22500

22,500.00

--

--

with in the limits

3073

--

--

2400

--

--

--

46

--

110,400.00

--

--

48,898.00

with in the limits

--

71,852.00

with in the limits

1520

152,000.00 200 Rmt

1520

304,000.00

152,000.00

--

excess length of 100mts. have been


used as per site conditions

46

129,352.00 2812 kg

46

129,352.00

129,352.00

--

4mts. of extra leangth used as per


site condition

9000

54,000.00

6 Nos.

9000

54,000.00

54,000.00

--

As per site conditions.

7500

7,500.00

1 No.

7500

7,500.00

7,500.00

--

As per site conditions.

10900

32,700.00

3 Nos.

10900

32,700.00

32,700.00

--

As per site conditions.

13000

26,000.00

2 Nos.

13000

26,000.00

26,000.00

--

As per site conditions.

9900

29,700.00

3 Nos.

9900

29,700.00

29,700.00

--

As per site conditions.

6125

110,250.00

110,250.00

--

As per site conditions.

6125

110,250.00 18 Rmt.

9900

9,900.00

1 No.

9900

9,900.00

9,900.00

--

As per site conditions.

1700

5,100.00

3 Nos.

1700

5,100.00

5,100.00

--

As per site conditions.

1500

4,500.00

3 Nos.

1500

4,500.00

4,500.00

--

As per site conditions.

455,400.00 66 mtrs

6900

455,400.00

455,400.00

6900

3074

As per site conditions.

495

89,100.00 18 Sqm

495

89,100.00

89,100.00

As per site conditions.

800

38,400.00

800

38,400.00

38,400.00

As per site conditions.

11,200,672.00
313,618.82

1,804,542.00

48 mtrs

6,032,392.00

348,521.00

34,811.00
112,006.72
11,661,108.54

10% Less T.P.

x 100

1120067.20
10080604.80

x 100
10080604.80-8770186.00
10121000.00
1310418.80
0.13
12.95 % excess over the agreement amount

3075

107967.20
1912509.20

107967.20
456488.20

WORK SLIP

Name of the Work: Wanaparthy Municipality UIDSSMT Manufacture, Supply, Delivery, Erection, Testing and Commissioning of V.T. Pumps for Raw Water & Clear Water a
Wanaparthy Municipality.

S.N.

Description of Work

Nos

Qty.

B) Manufacture, supply, delivery, erection, testing and commissioning of Clear Water pumping plant
with appurtenant works for pumping water to Yerragattu.

--

22

Supply, delivery, installation, testing and commissioning of 37 KW/50 HP Volts 1500 rpm (Syn) Phase 50
Hz,
TEFC
Horizontal
Foot
mounted
squirrel
cage
induction
motor
of
Kirloskar/Crompton/GEC/Alsthom/Jyothi /ABB or its equivalent standard make with cost and conveyance,
duties services, labour charges and all other incidental charges, excluding VAT.

3 Nos.

23

Supply, delivery, erecting, testing and commissioning of Horizontal split casing centrifugal pumps of
Kirloskar/Mather & Platt or its equivalent standard make to discharge 45.5 Lps head of 43 mtrs with
standard CI construction with bronze impeller and pressure gauges & Vacuum gauges siphon and cock,
cost and conveyance of material including, duties, services, labour charges and all other incidental
charges excluding VAT.

3 Nos.

24

Fabrication, supply and erection of common base frame made of MS heavy duty channel to accommodate
above pump and motor with couplings and painted with anticorrosive red oxide and enamel paint with cost
and conveyance material duties, services, labour charges and all other incidental charges excluding VAT.

3 Nos.

25

Laying of cement concrete (1:2:4) prop bed blocks of 2m 1.5mm for the above pump and motor including
earth work excavation providing anti vibration paid duly embedding with supply and fixing 6 nos. of
foundation bolts with nuts and washers including cost and conveyance, duties, services, labour charges
and all other incidental charges exlcuidng VAT.

3 job

3076

26

Fabrication, supply, installation, testing and commissioning of suitable control panel board made of MS
sheet metal cubicle type to accommodate following equipment including supply and fixing and sufficiently
earthed and duly applying hot processing powder coating including providing connection with end
termination with cost and conveyance, duties, services, labour charges and all other incidental charges
excluding VAT.
a) Fully automatic star delta starter, Air break type L&T/ BCH/ Schnieder or
equivalent make 3Nos.
b) 200 Amps TPN Switch fuse unit with HRC L&T/ Schnieder 1No
c) 3x10KVAR and 3x5 KVAR Power factor capacitor with control Switches. 1 Nos.
d) 150 amps TPN Switch fuse unit with HRC to control starters L&T/Schneider 3 Nos.
e) 0 500 Volts Voltmeter with selector switches 1 No.
f) 0 150A Ammeter with selector switch and C.I. Coils to read all phases 3 Nos.
g) 3 Phase indicating lamps R.Y.B. 3 Nos.
h) On and off, green and red push buttons with indicators 6 Nos.

27

Supplying, laying, jointing of 120 sqmm 31/2 core aluminum armored PVC insulated cable with end
termination kit for incoming supply from AP Transco main supply to panel including cost and conveyance,
duties, services, labour charges and all other incidental charges excluding VAT.

50 Rmt

28

Supply, laying and jointing of 25 sq.mm 3 core PVC insulated Aluminium armoured cable with end
termination kits lying from motor to starter, partial under ground and above ground duly encased with
heavy duty rigid PVC pipe for cable protection as per Standard and including cost and conveyance, duties,
services, labour charges and all other incidental charges but excluding VAT.

80 Rmt

29

Supply and fixing of 40x6mm GI Flat patty double earthing for electrical protecting for motor and pump and
panel board efficiently earthed duly providing earth pits and filling with salt, coal and G.I. 11/2x6 feet heavy
duty G.I., Pipe as per standards relevant 10 IS specifications providing 600x600x6 GI plate at bottom
welded lowering into pit and filling with cost and conveyance, duties, services, labour charges and all other
incidental charges but excluding VAT.

4 Nos.

30

Supply, delivery and fixing of 250mm dia CI/DF sluice valve heavy duty with cost and conveyance of valve,
joining materials viz. Bolts, nuts, washers and packing including of cost and conveyance, taxes, duties,
services, labour charges and all other incidental charges complete but excluding VAT.

3 Nos.

3077

1 No.

31

Supply, delivery and fixing of 250mm dia. CI/DF non return valve heavy duty with cost and conveyance of
valve, jointing materials Viz. Bolts, buts, washers and gasket including of, duties, services, labour charges
and all other incidental changes complete but excluding VAT.

3 Nos.

32

Manufacture, supply, delivery of MS flanges 250mm dia with 20mm thick MS plate including cost of MS
plate fabrication charges, for delivery connecting main but excluding VAT.

30 Nos.

33

Manufacture, supply delivery, fixing, testing of 2 Ton HOT travelling chain pulley trolley fixed on the I
Section in the Pump house duly arranging supports, alignment, Lowering at site by field gas cutting and
wielding to suit with necessary CC. Works including two coats of anti Corrosive paint trial run with cost, and
conveyance of materials services, labour charges, hire charges and all incidental charges but excluding
VAT.

1 lot

34

Supply, delivery, erecting and fixing of 3 HP vaccum pump along with base plate, foundation GI Specials,
Ball Valves, connecting to pump and starter for operating for priming the pump as per the site condition
including all necessary items and cost of materials, taxes, duties, services and other all incidental charges
but excluding VAT.

1 No.

35

Supply and delivery of necessary and suitable erection tools excluding VAT.
a) Ring spanner set 3/16 to 1
-- 1No
b) Double end spanner set 3/16 to 1 --1No
c) Pipe wrench 18 & 4 -- 2 Nos
d) Screw drivers 6, 10& 12 3 Nos.
e) Cutting plier 12 1No.
f) 2 kgs Hammer with handle. 1No.
g) Nose plier.1 No.
h) Flat & Half roung smooth file.2Nos.
i) Adjustable spanner6. 1No.
j) Gland tightening spanner. 1 No.
k) Grease gun- 1No.

1 No.

3078

36

Supply and delivery of necessary safety equipments as per IE rules excluding VAT.
a) Fire Extinguishers 2 kg capacity Co2 -- 2Nos.
b) Rubber matt 6x4. 2 Nos.
c) Fire buckets with stand and three buckets1No.
d) Rubber hand gloves.1 Set.
e) Danger board plates. 4Nos.
f) First aid lit with chart.1No.
g) Shock treatment chart. 1No.
h) Portable rechargeable torch light.1No.

1 No.

37

Manufacture, supply, delivery of 250mm dia MS pipe including the cost of MS plate with 10mm thick,
fabrication charges and wielding charges painting with three coats of epoxy black paint and transportation
charges for delivery connecting main but excluding VAT.

3463
Kg

38
39

Manufacturers, supply and delivery of 500mm x 400mm reducer.


Manufacture, supply, delivery of MS flanges 400mm dia with 20mm thick MS plate including cost of MS
plate fabrication charges, for delivery connecting main but excluding VAT.

---

40

Manufacture, supply, delivery of MS barrel manifold 500mm fabricated 10mm thick 12mts. Long MS plate
fabrication charges for delivery connecting main but excluding VAT.

--

41

Supply and fixing of Air cushion valve of 100mm dia as per AWWA including cost and conveyance of
materials, labour charges, duties, excluding VAT.

--

42

Manufacture, supply & fixing of 200x100mm MS gudders heavy.

--

43

Manufacture, supply & delivery of 250x150 MS Tappers.

--

44

Manufacture, supply & delivery of 250x100 MS Tappers.

--

45

Manufacture, supply, delivery of 500 mm MS dummy plate 1 no.

--

46

Manufacture, Supply, delivery of 250mm MS bends.

--

47

Manufacture, supply, delivery of MS flanges 150mm dia with 20mm thick MS plate including cost of MS
plate fabrication charges, for delivery connecting main but excluding VAT.

--

3079

48

Manufacture, supply, delivery of MS flanges 100mm dia with 20mm thick MS plate including cost of MS
plate fabrication charges, for delivery connecting main but excluding VAT.

TOTAL

3080

--

WORK SLIP

ction, Testing and Commissioning of V.T. Pumps for Raw Water & Clear Water and appurtenant works in various places of

Rate

Per

--

Amount
--

148200

444,600.00

114400

343,200.00

16500

49,500.00

13000

39,000.00

3081

240000

240,000.00

750

37,500.00

235

18,800.00

8000

32,000.00

19900

59,700.00

3082

19400

58,200.00

1963

58,890.00

290000

290,000.00

55400

55,400.00

21000

21,000.00

3083

22500

22,500.00

46

159,298.00

---

---

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

--

3084

--

--

1,929,588.00

3085

250 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
250 mm
270 mm
290 mm
354 mm
270 mm
290 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.284

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.262

Qty of cement mortar (1:3) for out coating

3.142

0.320

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.290

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

70.05 Kg
0.48 Kg
70.53 Kg
0.0100 Cum
0.0300 Cum
0.910 Sqm
1.829 Sqm
157.46 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

250

300 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
300 mm
320 mm
340 mm
404 mm
320 mm
340 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.334

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.312

Qty of cement mortar (1:3) for out coating

3.142

0.370

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.340

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

82.38 Kg
0.56 Kg
82.94 Kg
0.0120 Cum
0.0350 Cum
1.070 Sqm
2.143 Sqm
184.57 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

300

350 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
350 mm
370 mm
390 mm
454 mm
370 mm
390 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.384

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.362

Qty of cement mortar (1:3) for out coating

3.142

0.420

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.390

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

94.71 Kg
0.65 Kg
95.36 Kg
0.0140 Cum
0.0400 Cum
1.230 Sqm
2.457 Sqm
211.69 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @


Sub - Total
Add VAT @
Add Labour cess

14%
0%
0%
Total cost of the Pipe per 1 Rmt of

350

400 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
400 mm
420 mm
440 mm
504 mm
420 mm
440 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.434

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.412

Qty of cement mortar (1:3) for out coating

3.142

0.470

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.440

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

107.04 Kg
0.74 Kg
107.78 Kg
0.0160 Cum
0.0440 Cum
1.380 Sqm
2.771 Sqm
236.71 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @


Sub - Total
Add VAT @
Add Labour cess

14%
0%
0%
Total cost of the Pipe per 1 Rmt of

400

450 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
450 mm
470 mm
490 mm
554 mm
470 mm
490 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.484

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.462

Qty of cement mortar (1:3) for out coating

3.142

0.520

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.490

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

119.38 Kg
0.83 Kg
120.21 Kg
0.0170 Cum
0.0490 Cum
1.540 Sqm
3.085 Sqm
261.74 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @


Sub - Total
Add VAT @
Add Labour cess

14%
0%
0%
Total cost of the Pipe per 1 Rmt of

450

500 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
500 mm
520 mm
540 mm
604 mm
520 mm
540 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.534

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.512

Qty of cement mortar (1:3) for out coating

3.142

0.570

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.540

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

131.71 Kg
0.92 Kg
132.63 Kg
0.0190 Cum
0.0540 Cum
1.700 Sqm
3.400 Sqm
288.86 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @


Sub - Total
Add VAT @
Add Labour cess

14%
0%
0%
Total cost of the Pipe per 1 Rmt of

500

600 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
600 mm
620 mm
640 mm
704 mm
620 mm
640 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.634

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.612

Qty of cement mortar (1:3) for out coating

3.142

0.670

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.640

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

156.37 Kg
1.09 Kg
157.46 Kg
0.0230 Cum
0.0630 Cum
2.010 Sqm
4.028 Sqm
340.99 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @


Sub - Total
Add VAT @
Add Labour cess

14%
0%
0%
Total cost of the Pipe per 1 Rmt of

600

700 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
700 mm
720 mm
740 mm
804 mm
720 mm
740 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.734

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.712

Qty of cement mortar (1:3) for out coating

3.142

0.770

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.740

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

181.04 Kg
1.27 Kg
182.31 Kg
0.0270 Cum
0.0730 Cum
2.330 Sqm
4.656 Sqm
395.24 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Sub - Total
Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

700

750 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
750 mm
770 mm
790 mm
854 mm
770 mm
790 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.784

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.762

Qty of cement mortar (1:3) for out coating

3.142

0.820

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.790

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

193.37 Kg
1.36 Kg
194.73 Kg
0.0290 Cum
0.0770 Cum
2.480 Sqm
4.971 Sqm
420.26 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Sub - Total
Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

750

800 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
800 mm
820 mm
840 mm
904 mm
820 mm
840 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.834

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.812

Qty of cement mortar (1:3) for out coating

3.142

0.870

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.840

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

205.70 Kg
1.44 Kg
207.14 Kg
0.0310 Cum
0.0820 Cum
2.640 Sqm
5.285 Sqm
447.37 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Sub - Total
Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

800

900 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
900 mm
920 mm
940 mm
1004 mm
920 mm
940 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.934

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.912

Qty of cement mortar (1:3) for out coating

3.142

0.970

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.940

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

230.37 Kg
1.62 Kg
231.99 Kg
0.0340 Cum
0.0910 Cum
2.950 Sqm
5.913 Sqm
497.42 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Sub - Total
Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

900

1000 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
1000 mm
1020 mm
1040 mm
1104 mm
1020 mm
1040 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

1.034

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
1.012

Qty of cement mortar (1:3) for out coating

3.142

1.070

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

1.040

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

255.03 Kg
1.80 Kg
256.83 Kg
0.0380 Cum
0.1010 Cum
3.270 Sqm
6.542 Sqm
551.66 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Sub - Total
Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

1000

1100 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
1100 mm
1120 mm
1140 mm
1204 mm
1120 mm
1140 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

1.134

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
1.112

Qty of cement mortar (1:3) for out coating

3.142

1.170

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

1.140

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

279.70 Kg
1.97 Kg
281.67 Kg
0.0420 Cum
0.1100 Cum
3.580 Sqm
7.170 Sqm
603.80 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Sub - Total
Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

1100

1200 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

10 mm
12 mm
30 mm
1200 mm
1220 mm
1240 mm
1304 mm
1220 mm
1240 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

1.234

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
1.212

Qty of cement mortar (1:3) for out coating

3.142

1.270

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

1.240

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

304.36 Kg
2.15 Kg
306.51 Kg
0.0460 Cum
0.1200 Cum
3.900 Sqm
7.798 Sqm
658.04 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @

14%

Sub - Total
Add VAT @
Add Labour cess

0%
0%
Total cost of the Pipe per 1 Rmt of

1200

600 mm dia MS PIPE


DATA
Thickness of MS plate
Thickness of inlining
Thickness of out coating
Inner dia of the pipe after inlining
Outer dia of inlining / inner dia of of MS barral
Outer dia of MS barral / inner dia of outcoating
Outer dia of the pipe with outcoating
Length of 6 mm MS rings
Length of 50x50x3 Wiremesh
Length of barrel
Density of Steel

12 mm
12 mm
30 mm
600 mm
624 mm
648 mm
708 mm
624 mm
648 mm
1000 mm
7850 Kg

RATES
Cost of MS Plate
Cost of 6mm dia rods including fabrication
Fabrication Charges
Cost of cement mortar (1:2) prop.
Cost of cement mortar (1:3) prop.
Cost of wire mesh
Cost of guniting
Transportation charges of Pipe

38000.00 MT
36000.00 MT
6500.00 MT
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
550.00 MT

QUANTITIES
Weight of MS plate for 1 Rmt of pipe
x d x t x l x7850

3.142

0.636

Weight of MS bars for 1 Rmt (2x4) = 8 Nos.


Qty of cement mortar (1:2) for inlining

2
3.142

4
0.612

Qty of cement mortar (1:3) for out coating

3.142

0.678

Qty of wire mesh


Qty of Guniting (inlining + Out coating)
Transportation
Weight of MS barral
Weight of CM @ 2100Kg/Cum

3.142

0.648

Add for MS rods and Mesh etc.


Total weight of the pipe / 1 Rmt

ABSTRACT
Cost of MS plate
Cost of 6mm MS rods
Fabrication charges
Cost of CM (1:2 )
Cost of CM ( 1:3 )
Cost of wire mesh
Cost of guniting
Transportation charges
Add Lowering,Laying and jointing charges

188.24 Kg
1.10 Kg
189.34 Kg
0.0230 Cum
0.0640 Cum
2.040 Sqm
4.053 Sqm
374.97 Kg
1 Rmt

Add Central Excise Duty on pipe cost at


Deduct CED on MS Plate and MS Bars at

0.00%
0.00%

Add Contractors Profit @


Sub - Total
Add VAT @
Add Labour cess

14%
0%
0%
Total cost of the Pipe per 1 Rmt of

600

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.25 Mts.
0.270 Mts.
0.290 Mts.

or
or
or
or

0.354 Mts.
0.270 Mts.
0.290 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.270
0.012

0.220
1.00

0.030

1.00

70.05 Kg
70.05 Kg
0.48 Kg
0.010
0.0100 Cum
0.030 Cum
0.0300 Cum
0.910 Sqm
1.829 Sqm

1.00

70.050
84.00
154.050 Kg
3.410
157.46 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
253.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

2661.90
17.28
458.45
51.11
112.02
213.85
148.12
86.60
253.00
4002.33
0
0.00
4002.33

mm dia

Rs.

560.33
4562.66
0.00
0.00
4562.66

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.30 Mts.
0.320 Mts.
0.340 Mts.

or
or
or
or

0.404 Mts.
0.320 Mts.
0.340 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.320
0.012

0.220
1.00

0.030

1.00

82.38 Kg
82.38 Kg
0.56 Kg
0.012
0.0120 Cum
0.035 Cum
0.0350 Cum
1.070 Sqm
2.143 Sqm

1.00

82.380
98.70
181.080 Kg
3.490
184.57 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
297.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

3130.44
20.16
539.11
61.34
130.69
251.45
173.57
101.51
297.00
4705.27
0
0.00
4705.27

mm dia

Rs.

658.74
5364.01
0.00
0.00
5364.01

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.35 Mts.
0.370 Mts.
0.390 Mts.

or
or
or
or

0.454 Mts.
0.370 Mts.
0.390 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.370
0.012

0.220
1.00

0.030

1.00

94.71 Kg
94.71 Kg
0.65 Kg
0.014
0.0140 Cum
0.040 Cum
0.0400 Cum
1.230 Sqm
2.457 Sqm

1.00

94.710
113.40
208.110 Kg
3.580
211.69 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
352.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

3598.98
23.40
619.84
71.56
149.36
289.05
199.02
116.43
352.00
5419.64
0
0.00
5419.64

mm dia

Rs.

758.75
6178.39
0.00
0.00
6178.39

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.40 Mts.
0.420 Mts.
0.440 Mts.

or
or
or
or

0.504 Mts.
0.420 Mts.
0.440 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.420
0.012

0.220
1.00

0.030

1.00

107.04 Kg
107.04 Kg
0.74 Kg
0.016
0.0160 Cum
0.044 Cum
0.0440 Cum
1.380 Sqm
2.771 Sqm

1.00

107.040
126.00
233.040 Kg
3.670
236.71 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
435.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

4067.52
26.64
700.57
81.78
164.29
324.30
224.47
130.19
435.00
6154.76
0
0.00
6154.76

mm dia

Rs.

861.67
7016.43
0.00
0.00
7016.43

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.45 Mts.
0.470 Mts.
0.490 Mts.

or
or
or
or

0.554 Mts.
0.470 Mts.
0.490 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.470
0.012

0.220
1.00

0.030

1.00

119.38 Kg
119.38 Kg
0.83 Kg
0.017
0.0170 Cum
0.049 Cum
0.0490 Cum
1.540 Sqm
3.085 Sqm

1.00

119.380
138.60
257.980 Kg
3.760
261.74 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
542.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

4536.44
29.88
781.37
86.90
182.96
361.90
249.92
143.96
542.00
6915.33
0
0.00
6915.33

mm dia

Rs.

968.15
7883.48
0.00
0.00
7883.48

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.50 Mts.
0.520 Mts.
0.540 Mts.

or
or
or
or

0.604 Mts.
0.520 Mts.
0.540 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.520
0.012

0.220
1.00

0.030

1.00

131.71 Kg
131.71 Kg
0.92 Kg
0.019
0.0190 Cum
0.054 Cum
0.0540 Cum
1.700 Sqm
3.400 Sqm

1.00

131.710
153.30
285.010 Kg
3.850
288.86 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
667.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

5004.98
33.12
862.10
97.12
201.63
399.50
275.37
158.87
667.00
7699.69
0
0.00
7699.69

mm dia

Rs.

1077.96
8777.65
0.00
0.00
8777.65

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.60 Mts.
0.620 Mts.
0.640 Mts.

or
or
or
or

0.704 Mts.
0.620 Mts.
0.640 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.620
0.012

0.220
1.00

0.030

1.00

156.37 Kg
156.37 Kg
1.09 Kg
0.023
0.0230 Cum
0.063 Cum
0.0630 Cum
2.010 Sqm
4.028 Sqm

1.00

156.370
180.60
336.970 Kg
4.020
340.99 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
774.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

5942.06
39.24
1023.49
117.56
235.23
472.35
326.27
187.54
774.00
9117.74
0
0.00
9117.74

mm dia

Rs.

1276.48
10394.22
0.00
0.00
10394.22

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.70 Mts.
0.720 Mts.
0.740 Mts.

or
or
or
or

0.804 Mts.
0.720 Mts.
0.740 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.720
0.012

0.220
1.00

0.030

1.00

181.04 Kg
181.04 Kg
1.27 Kg
0.027
0.0270 Cum
0.073 Cum
0.0730 Cum
2.330 Sqm
4.656 Sqm

1.00

181.040
210.00
391.040 Kg
4.200
395.24 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
883.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

6879.52
45.72
1185.02
138.01
272.57
547.55
377.17
217.38
883.00
10545.94
0
0.00
10545.94
1476.43

mm dia

Rs.

12022.37
0.00
0.00
12022.37

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.75 Mts.
0.770 Mts.
0.790 Mts.

or
or
or
or

0.854 Mts.
0.770 Mts.
0.790 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.770
0.012

0.220
1.00

0.030

1.00

193.37 Kg
193.37 Kg
1.36 Kg
0.029
0.0290 Cum
0.077 Cum
0.0770 Cum
2.480 Sqm
4.971 Sqm

1.00

193.370
222.60
415.970 Kg
4.290
420.26 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
883.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

7348.06
48.96
1265.75
148.23
287.51
582.80
402.62
231.14
883.00
11198.07
0
0.00
11198.07
1567.73

mm dia

Rs.

12765.80
0.00
0.00
12765.80

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.80 Mts.
0.820 Mts.
0.840 Mts.

or
or
or
or

0.904 Mts.
0.820 Mts.
0.840 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.820
0.012

0.220
1.00

0.030

1.00

205.70 Kg
205.70 Kg
1.44 Kg
0.031
0.0310 Cum
0.082 Cum
0.0820 Cum
2.640 Sqm
5.285 Sqm

1.00

205.700
237.30
443.000 Kg
4.370
447.37 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
1038.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

7816.60
51.84
1346.41
158.46
306.18
620.40
428.07
246.05
1038.00
12012.01
0
0.00
12012.01
1681.68

mm dia

Rs.

13693.69
0.00
0.00
13693.69

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
0.90 Mts.
0.920 Mts.
0.940 Mts.

or
or
or
or

1.004 Mts.
0.920 Mts.
0.940 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

0.920
0.012

0.220
1.00

0.030

1.00

230.37 Kg
230.37 Kg
1.62 Kg
0.034
0.0340 Cum
0.091 Cum
0.0910 Cum
2.950 Sqm
5.913 Sqm

1.00

230.370
262.50
492.870 Kg
4.550
497.42 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
1146.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

8754.06
58.32
1507.94
173.79
339.78
693.25
478.97
273.58
1146.00
13425.69
0
0.00
13425.69
1879.60

mm dia

Rs.

15305.29
0.00
0.00
15305.29

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
1.00 Mts.
1.020 Mts.
1.040 Mts.

or
or
or
or

1.104 Mts.
1.020 Mts.
1.040 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

1.020
0.012

0.220
1.00

0.030

1.00

255.03 Kg
255.03 Kg
1.80 Kg
0.038
0.0380 Cum
0.101 Cum
0.1010 Cum
3.270 Sqm
6.542 Sqm

1.00

255.030
291.90
546.930 Kg
4.730
551.66 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
1348.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

9691.14
64.80
1669.40
194.24
377.12
768.45
529.87
303.41
1348.00
14946.43
0
0.00
14946.43
2092.50

mm dia

Rs.

17038.93
0.00
0.00
17038.93

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
1.10 Mts.
1.120 Mts.
1.140 Mts.

or
or
or
or

1.204 Mts.
1.120 Mts.
1.140 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

1.120
0.012

0.220
1.00

0.030

1.00

279.70 Kg
279.70 Kg
1.97 Kg
0.042
0.0420 Cum
0.110 Cum
0.1100 Cum
3.580 Sqm
7.170 Sqm

1.00

279.700
319.20
598.900 Kg
4.900
603.80 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
1510.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

10628.60
70.92
1830.86
214.68
410.73
841.30
580.77
332.09
1510.00
16419.95
0
0.00
16419.95
2298.79

mm dia

Rs.

18718.74
0.00
0.00
18718.74

S PIPE
or
or
or
or
or
or

0.010 Mts.
0.012 Mts.
0.030 Mts.
1.20 Mts.
1.220 Mts.
1.240 Mts.

or
or
or
or

1.304 Mts.
1.220 Mts.
1.240 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.010

1.000

1.220
0.012

0.220
1.00

0.030

1.00

304.36 Kg
304.36 Kg
2.15 Kg
0.046
0.0460 Cum
0.120 Cum
0.1200 Cum
3.900 Sqm
7.798 Sqm

1.00

304.360
348.60
652.960 Kg
5.080
658.04 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
1735.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

11565.68
77.40
1992.32
235.13
448.07
916.50
631.67
361.92
1735.00
17963.69
0
0.00
17963.69
2514.92

mm dia

Rs.

20478.61
0.00
0.00
20478.61

S PIPE
or
or
or
or
or
or

0.012 Mts.
0.012 Mts.
0.030 Mts.
0.60 Mts.
0.624 Mts.
0.648 Mts.

or
or
or
or

0.708 Mts.
0.624 Mts.
0.648 Mts.
1.000 Mts.

or
or
or
or
or
or
or
or

38.00 Kg
36.00 Kg
6.50 Kg
5111.48 Cum
3733.88 Cum
235.00 Sqm
81.00 Sqm
0.550 Kg

0.012

1.000

0.624
0.012

0.220
1.00

0.030

1.00

188.24 Kg
188.24 Kg
1.10 Kg
0.023
0.0230 Cum
0.064 Cum
0.0640 Cum
2.040 Sqm
4.053 Sqm

1.00

188.240
182.70
370.940 Kg
4.030
374.97 Kg
38.00
36.00
6.50
5111.48
3733.88
235.00
81.00
0.55
774.00

1 Kg
1 Kg
1 Kg
1 Cum
1 Cum
1 Sqm
1 Sqm
1 Kg
1 Rmt
Total

7153.12
39.60
1230.71
117.56
238.97
479.40
328.31
206.23
774.00
10567.90
0
0.00
10567.90

mm dia

Rs.

1479.51
12047.41
0.00
0.00
12047.41

Page 3146 of 3205


Cost of MS plate
Fabrication Charges
1

Transportation Charges
Manufacturing, supply of MS Specials manufactured by electric resistant welding (ERW) or submerged arc welding
spirally welded from 10mm thick MS plates conforming to IS 2062, grade -A/B in suitable lengths to suit the si
departmental officers incluidng inlinining and outcoating with Two coats of epoxy paint of approved quality as pe
MS plates, welding rods, cement, steel and all other required materials inclusive of all taxes and duties and delivery
hosting and carefully lowering in to ready made trenches keeping in position on ready built, pedestals or support a
gradient and perfect lining by jacking and jointing inclusive of all jointing materials and labour charges. and all
charges etc., complete.

MS Flanges
1

1200mm dia
Cost of Flanges
Outer dia of Flange

1455 mm

Inner dia of flange

1200 mm

Thickness of flange

25 mm

No of holes

28 Nos

Weight of flange

1.455

1.455

Deduct internal dia

3.143

0.36

Outer dia (22/7*R^2*h)*7850

3.143

0.53

Inner dia (22/7*r^2*h)*7850

3.143

0.36

add 5% wastage
Total weight
Fabrication weight

Abstract
i

cost of MS plate

203.10 Kg @

ii

fabrication charges

104.24 Kg @

iii

machinning charges

iv

drilling holes etc

Transportation

1 job
28 Nos @
193.43 Kg @

Total

Data - MS flanges

Page 3147 of 3205


2

1100mm dia
Cost of Flanges
Outer dia of Flange

1340 mm

Inner dia of flange

1100 mm

Thickness of flange

25 mm

No of holes

28 Nos

Weight of flange

1.340

1.340

Deduct internal dia

3.143

0.30

3.142

0.45

Inner dia (22/7*r^2*h)*7850

-3.142

0.30

Abstract
cost of MS plate

174.10 Kg @

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850

i
ii
iii

fabrication charges

92.49 Kg @

machinning charges

1 job

iv
v

drilling holes etc

28 Nos @
165.81 Kg @

Transportation
Total

i
ii
iii
iv
v

1000mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

1230 mm
1000 mm
25 mm
28 Nos
1.230
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142
149.85 Kg @
80.16 Kg @
1 job
28 Nos @
142.71 Kg @

Data - MS flanges

1.230
0.25

0.38
0.25

Page 3148 of 3205


4

900mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

i
ii
iii
iv
v

i
ii
iii
iv
v

1115 mm
900 mm
25 mm
28 Nos
1.115
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

1.115
0.20

0.31
0.20

125.03 Kg @
67.83 Kg @
1 job
28 Nos @
119.08 Kg @

800mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

1015 mm
800 mm
25 mm
24 Nos
1.015
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142
108.66 Kg @
61.66 Kg @
1 job
24 Nos @
103.49 Kg @

Data - MS flanges

1.015
0.16

0.26
0.16

Page 3149 of 3205


6

i
ii
iii
iv
v

i
ii
iii
iv
v

750mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

960 mm
750 mm
25 mm
24 Nos
0.960
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

0.960
0.14

0.23
0.14

98.83 Kg @
55.49 Kg @
1 job
24 Nos @
94.12 Kg @

700mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

895 mm
700 mm
25 mm
24 Nos
0.895
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142
85.72 Kg @
49.33 Kg @
1 job
24 Nos @
81.64 Kg @

Data - MS flanges

0.895
0.12

0.20
0.12

Page 3150 of 3205


8

i
ii
iii
iv
v

i
ii
iii
iv
v

600mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

780 mm
600 mm
20 mm
20 Nos
0.780
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

0.780
0.09

0.15
0.09

53.67 Kg @
29.59 Kg @
1 job
20 Nos @
51.11 Kg @

500mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

665 mm
500 mm
18 mm
20 Nos
0.665
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142
36.47 Kg @
22.20 Kg @
1 job
20 Nos @
34.73 Kg @

Data - MS flanges

0.665
0.06

0.11
0.06

Page 3151 of 3205


10 450mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

i
ii
iii
iv
v

615 mm
450 mm
18 mm
20 Nos
0.615
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

0.09
0.05

32.51 Kg @
17.76 Kg @
1 job
20 Nos @
30.96 Kg @

11 400mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

i
ii
iii
iv
v

0.615
0.05

565 mm
400 mm
18 mm
16 Nos
0.565
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

0.565
0.04

0.08
0.04

28.72 Kg @
17.76 Kg @
1 job
16 Nos @
27.35 Kg @

12 350mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

505 mm
350 mm
18 mm
16 Nos
0.505
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850

3.142
-3.142
Data - MS flanges

0.505
0.03

0.06
0.03

Page 3152 of 3205


i
ii
iii
iv
v

Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

23.56 Kg @
13.32 Kg @
1 job
16 Nos @
22.44 Kg @

Data - MS flanges

Page 3153 of 3205


13 300mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

i
ii
iii
iv
v

445 mm
300 mm
15 mm
12 Nos
0.445
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

0.05
0.02

15.74 Kg @
11.10 Kg @
1 job
12 Nos @
14.99 Kg @

14 250mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

i
ii
iii
iv
v

0.445
0.02

395 mm
250 mm
15 mm
12 Nos
0.395
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

0.395
0.02

0.04
0.02

13.22 Kg @
7.40 Kg @
1 job
12 Nos @
12.59 Kg @

15 200mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

340 mm
200 mm
15 mm
8 Nos
0.340
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850

3.142
Data - MS flanges

0.340
0.01

0.03

Page 3154 of 3205

i
ii
iii
iv
v

Inner dia (22/7*r^2*h)*7850


Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

-3.142
10.41 Kg @
7.40 Kg @
1 job
8 Nos @
9.91 Kg @

Data - MS flanges

0.01

Page 3155 of 3205


16 150mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

i
ii
iii
iv
v

285 mm
150 mm
15 mm
8 Nos
0.285
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

0.02
0.01

7.85 Kg @
3.70 Kg @
1 job
8 Nos @
7.48 Kg @

17 100mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

i
ii
iii
iv
v

0.285
0.01

220 mm
100 mm
15 mm
8 Nos
0.220
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850
Inner dia (22/7*r^2*h)*7850
Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

3.142
-3.142

0.220
0.00

0.01
0.00

5.01 Kg @
3.70 Kg @
1 job
8 Nos @
4.77 Kg @

18 80mm dia
Cost of Flanges
Outer dia of Flange
Inner dia of flange
Thickness of flange
No of holes
Weight of flange
Deduct internal dia

200 mm
80 mm
15 mm
4 Nos
0.200
3.143

add 5% wastage
Total weight
Fabrication weight
Outer dia (22/7*R^2*h)*7850

3.142
Data - MS flanges

0.200
0.00

0.01

Page 3156 of 3205

i
ii
iii
iv
v

Inner dia (22/7*r^2*h)*7850


Abstract
cost of MS plate
fabrication charges
machinning charges
drilling holes etc
Transportation
Total

-3.142
4.33 Kg @
3.70 Kg @
1 job
4 Nos @
4.12 Kg @

Data - MS flanges

0.00

Page 3157 of 3205


Rs.
Rs.

38000.00 /MT
6500.00 /MT

Rs.
550.00 /MT
ing (ERW) or submerged arc welding (SAW) process longtiduinally or
A/B in suitable lengths to suit the site conditions as directed by the
poxy paint of approved quality as per specifications, including cost of
ve of all taxes and duties and delivery of fabricated MS specials to site
on ready built, pedestals or support and laying true to alignment and
terials and labour charges. and all other incidential and operational

or

1.455 Mts.

or

1.20 Mts.

or

0.025 Mts.

0.025

7850.00

415.47 Kg

0.025

-7850.00

-222.04 Kg
193.43 Kg
9.67 Kg
203.10 Kg

0.025

7850.00

326.28 Kg

0.025

-7850.00

-222.04 Kg
104.24 Kg

38.00

1 Kg

7718.00

6.50

1 Kg

678.00
600.00

20.00

Each

560.00

0.55

1 Kg

106.00

Rs.

9662.00 / each

Data - MS flanges

Page 3158 of 3205

or

1.340 Mts.

or

1.10 Mts.

or

0.025 Mts.
0.025

7850.00

352.39 Kg

0.025

-7850.00

-186.58 Kg
165.81 Kg
8.29 Kg
174.10 Kg

0.025

7850.00

277.48 Kg

0.025

7850.00

-184.99 Kg

38.00

1 Kg

92.49 Kg
6616.00

6.50

1 Kg

601.00
600.00

20.00

Each

560.00

0.55

1 Kg

91.00

Rs.

or
or
or

8468.00 / each

1.230 Mts.
1.00 Mts.
0.025 Mts.
0.025
0.025

7850.00
-7850.00

296.91 Kg
-154.20 Kg
142.71 Kg
7.14 Kg
149.85 Kg

0.025
0.025

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

234.31 Kg
-154.15 Kg
80.16 Kg
5694.00
521.00
600.00

20.00
0.55

Each
1 Kg
Rs.

560.00
78.00
7453.00 / each

Data - MS flanges

Page 3159 of 3205

or
or
or

1.115 Mts.
0.90 Mts.
0.025 Mts.
0.025
0.025

7850.00
-7850.00

0.025
0.025

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

or
or
or

243.98 Kg
-124.90 Kg
119.08 Kg
5.95 Kg
125.03 Kg
191.15 Kg
-123.32 Kg
67.83 Kg
4751.00
441.00
600.00
560.00
65.00
6417.00 / each

1.015 Mts.
0.80 Mts.
0.025 Mts.
0.025
0.025

7850.00
-7850.00

0.025
0.025

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

202.18 Kg
-98.69 Kg
103.49 Kg
5.17 Kg
108.66 Kg
160.32 Kg
-98.66 Kg
61.66 Kg
4129.00
401.00
600.00
480.00
57.00
5667.00 / each

Data - MS flanges

Page 3160 of 3205

or
or
or

0.960 Mts.
0.75 Mts.
0.025 Mts.
0.025
0.025

7850.00
-7850.00

0.025
0.025

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

or
or
or

180.86 Kg
-86.74 Kg
94.12 Kg
4.71 Kg
98.83 Kg
141.82 Kg
-86.33 Kg
55.49 Kg
3756.00
361.00
600.00
480.00
52.00
5249.00 / each

0.895 Mts.
0.70 Mts.
0.025 Mts.
0.025
0.025

7850.00
-7850.00

0.025
0.025

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

157.20 Kg
-75.56 Kg
81.64 Kg
4.08 Kg
85.72 Kg
123.32 Kg
-73.99 Kg
49.33 Kg
3257.00
321.00
600.00
480.00
45.00
4703.00 / each

Data - MS flanges

Page 3161 of 3205

or
or
or

0.780 Mts.
0.60 Mts.
0.020 Mts.
0.020
0.020

7850.00
-7850.00

0.020
0.020

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

or
or
or

95.52 Kg
-44.41 Kg
51.11 Kg
2.56 Kg
53.67 Kg
73.99 Kg
-44.4 Kg
29.59 Kg
2039.00
192.00
600.00
400.00
28.00
3259.00 / each

0.665 Mts.
0.50 Mts.
0.018 Mts.
0.018
0.018

7850.00
-7850.00

0.018
0.018

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

62.49 Kg
-27.76 Kg
34.73 Kg
1.74 Kg
36.47 Kg
48.84 Kg
-26.64 Kg
22.20 Kg
1386.00
144.00
600.00
400.00
19.00
2549.00 / each

Data - MS flanges

Page 3162 of 3205

or
or
or

0.615 Mts.
0.45 Mts.
0.018 Mts.
0.018
0.018

7850.00
-7850.00

0.018
0.018

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

or
or
or

53.44 Kg
-22.48 Kg
30.96 Kg
1.55 Kg
32.51 Kg
39.96 Kg
-22.2 Kg
17.76 Kg
1235.00
115.00
500.00
400.00
17.00
2267.00 / each

0.565 Mts.
0.40 Mts.
0.018 Mts.
0.018
0.018

7850.00
-7850.00

0.018
0.018

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

or
or
or

45.11 Kg
-17.76 Kg
27.35 Kg
1.37 Kg
28.72 Kg
35.52 Kg
-17.76 Kg
17.76 Kg
1091.00
115.00
500.00
320.00
15.00
2041.00 / each

0.505 Mts.
0.35 Mts.
0.018 Mts.
0.018
0.018

7850.00
-7850.00

36.04 Kg
-13.60 Kg
22.44 Kg
1.12 Kg
23.56 Kg

0.018
0.018

7850.00
7850.00

26.64 Kg
-13.32 Kg
Data - MS flanges

Page 3163 of 3205


38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

13.32 Kg
895.00
87.00
500.00
320.00
12.00
1814.00 / each

Data - MS flanges

Page 3164 of 3205

or
or
or

0.445 Mts.
0.30 Mts.
0.015 Mts.
0.015
0.015

7850.00
-7850.00

23.32 Kg
-8.33 Kg
14.99 Kg
0.75 Kg
15.74 Kg

0.015
0.015

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

18.50 Kg
-7.4 Kg
11.10 Kg
598.00
72.00
500.00
240.00
8.00
1418.00 / each

or
or
or

0.395 Mts.
0.25 Mts.
0.015 Mts.
0.015
0.015

7850.00
-7850.00

18.37 Kg
-5.78 Kg
12.59 Kg
0.63 Kg
13.22 Kg

0.015
0.015

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

14.80 Kg
-7.4 Kg
7.40 Kg
502.00
48.00
400.00
240.00
7.00
1197.00 / each

or
or
or

0.340 Mts.
0.20 Mts.
0.015 Mts.
0.015
0.015

7850.00
-7850.00

13.61 Kg
-3.70 Kg
9.91 Kg
0.5 Kg
10.41 Kg

0.015

7850.00

11.10 Kg
Data - MS flanges

Page 3165 of 3205


0.015

7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

-3.7 Kg
7.40 Kg
396.00
48.00
400.00
160.00
5.00
1009.00 / each

Data - MS flanges

Page 3166 of 3205

or
or
or

0.285 Mts.
0.15 Mts.
0.015 Mts.
0.015
0.015

7850.00
-7850.00

0.015
0.015

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

or
or
or

9.56 Kg
-2.08 Kg
7.48 Kg
0.37 Kg
7.85 Kg
7.40 Kg
-3.7 Kg
3.70 Kg
298.00
24.00
400.00
160.00
4.00
886.00 / each

0.220 Mts.
0.10 Mts.
0.015 Mts.
0.015
0.015

7850.00
-7850.00

0.015
0.015

7850.00
7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

or
or
or

5.70 Kg
-0.93 Kg
4.77 Kg
0.24 Kg
5.01 Kg
3.70 Kg
0 Kg
3.70 Kg
190.00
24.00
200.00
160.00
3.00
577.00 / each

0.200 Mts.
0.08 Mts.
0.015 Mts.
0.015
0.015

7850.00
-7850.00

4.71 Kg
-0.59 Kg
4.12 Kg
0.21 Kg
4.33 Kg

0.015

7850.00

3.70 Kg
Data - MS flanges

Page 3167 of 3205


0.015

7850.00

38.00
6.50

1 Kg
1 Kg

20.00
0.55

Each
1 Kg
Rs.

0 Kg
3.70 Kg
165.00
24.00
200.00
80.00
2.00
471.00 / each

Data - MS flanges

Page 3168 of 3205


23

Manufacturing, supply of MS Specials manufactured by electric resistant welding (ERW) or submerged a


longtiduinally or spirally welded from 10mm thick MS plates conforming to IS 2062, grade -A/B in suitable lengths
directed by the departmental officers incluidng inlinining and outcoating with Two coats of epoxy paint of approved q
including cost of MS plates, welding rods, cement, steel and all other required materials inclusive of all taxes
fabricated MS specials to site hosting and carefully lowering in to ready made trenches keeping in position on read
and laying true to alignment and gradient and perfect lining by jacking and jointing inclusive of all jointing materials
other incidential and operational charges etc., complete.

Mild Steel Plain end TEEs


a

1200x1200x800 mm dia M.S Tee


Dia of Main barral

1200 mm

or

800 mm

or

2000 mm

or

Length of the branch barral

300 mm

or

Cost of 1200 mm dia M.S.barrel

2.00 Mts

Cost of 800mm dia M.S.barral

0.30 Mts

Dia of branch barral


Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

297.00
Cost of

1200x1200x800 mm dia M.S Tee

1100x1100x800 mm dia M.S Tee


Dia of Main barral

1100 mm

or

800 mm

or

2000 mm

or

Length of the branch barral

300 mm

or

Cost of 1100 mm dia M.S.barrel

2.00 Mts

Cost of 800 mm dia M.S.barrel

0.30 Mts

Dia of branch barral


Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

297.00
Cost of

1100x1100x800 mm dia M.S Tee

1000 x 1000 x 750 mm dia M.S Tee


Dia of Main barral

1000 mm

or

800 mm

or

2000 mm

or

Length of the branch barral

300 mm

or

Cost of 1000 mm dia M.S.barrel

2.00 Mts

Cost of 800 mm dia M.S.barrel

0.30 Mts

Dia of branch barral


Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

297.00
Cost of

Data - MS TEEs

1000 x 1000 x 750 mm dia M.S Tee

Page 3169 of 3205


d

900 x 900 x 600 mm dia M.S Tee


Dia of Main barral

900 mm

or

Dia of branch barral

600 mm

or

1800 mm

or

Length of the branch barral

300 mm

or

Cost of 900 mm dia M.S.barrel

1.80 Mts

Cost of 600 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

223.00
Cost of

800x800x600 mm dia M.S Tee


Dia of Main barral
Dia of branch barral
Length of the Main barral
Length of the branch barral
Cost of 800 mm dia M.S.barrel
Cost of 600 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

800 mm
600 mm
1800 mm
300 mm
1.80 Mts
0.30 Mts

800x800x600 mm dia M.S Tee

700 x 700 x 600 mm dia M.S Tee


Dia of Main barral
Dia of branch barral
Length of the Main barral
Length of the branch barral
Cost of 700 mm dia M.S.barrel
Cost of 600 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

700 mm
600 mm
1800 mm
300 mm
1.80 Mts
0.30 Mts

or
or
or
or
@
@
223.00

Cost of
c

or
or
or
or
@
@
223.00

Cost of

900 x 900 x 600 mm dia M.S Tee

700 x 700 x 600 mm dia M.S Tee

600x600x600 mm dia M.S Tee


Dia of Main barral

600 mm

or

Dia of branch barral

600 mm

or

1800 mm

or

Length of the branch barral

300 mm

or

Cost of 600 mm dia M.S.barrel

1.80 Mts

Cost of 600 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

223.00
Cost of

Data - MS TEEs

600x600x600 mm dia M.S Tee

Page 3170 of 3205

Data - MS TEEs

Page 3171 of 3205


d

500x500x500 mm dia M.S Tee


Dia of Main barral

500 mm

or

Dia of branch barral

450 mm

or

1650 mm

or

Length of the branch barral

300 mm

or

Cost of 500 mm dia M.S.barrel

1.65 Mts

Cost of 450 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

167.00
Cost of

500x500x500 mm dia M.S Tee

500x500x350 mm dia M.S Tee


Dia of Main barral

500 mm

or

Dia of branch barral

350 mm

or

1550 mm

or

Length of the branch barral

300 mm

or

Cost of 500 mm dia M.S.barrel

1.55 Mts

Cost of 350 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

130.00
Cost of

500x500x350 mm dia M.S Tee

450x450x300 mm dia M.S Tee


Dia of Main barral

450 mm

or

Dia of branch barral

300 mm

or

1500 mm

or

Length of the branch barral

300 mm

or

Cost of 450 mm dia M.S.barrel

1.50 Mts

Cost of 300 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

111.00
Cost of

450x450x300 mm dia M.S Tee

1200x1200x150 mm dia M.S Tee


Dia of Main barral

1200 mm

or

150 mm

or

1350 mm

or

Length of the branch barral

300 mm

or

Cost of 1200 mm dia M.S.barrel

1.35 Mts

Cost of 150 mm dia M.S.barrel

0.30 Mts

Dia of branch barral


Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

56.00
Cost of

Data - MS TEEs

1200x1200x150 mm dia M.S Tee

Page 3172 of 3205


g

1100x1100x150 mm dia M.S Tee


Dia of Main barral

1100 mm

or

150 mm

or

1350 mm

or

Length of the branch barral

300 mm

or

Cost of 1100 mm dia M.S.barrel

1.35 Mts

Cost of 150 mm dia M.S.barrel

0.30 Mts

Dia of branch barral


Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

56.00
Cost of

1100x1100x150 mm dia M.S Tee

1000x1000x150 mm dia M.S Tee


Dia of Main barral

1000 mm

or

150 mm

or

1350 mm

or

Length of the branch barral

300 mm

or

Cost of 1000 mm dia M.S.barrel

1.35 Mts

Cost of 150 mm dia M.S.barrel

0.30 Mts

Dia of branch barral


Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

56.00
Cost of

1000x1000x150 mm dia M.S Tee

900x900x150 mm dia M.S Tee


Dia of Main barral

900 mm

or

Dia of branch barral

150 mm

or

1350 mm

or

Length of the branch barral

300 mm

or

Cost of 900 mm dia M.S.barrel

1.35 Mts

Cost of 150 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

56.00
Cost of

900x900x150 mm dia M.S Tee

800x800x100 mm dia M.S Tee


Dia of Main barral

800 mm

or

Dia of branch barral

100 mm

or

1300 mm

or

Length of the branch barral

300 mm

or

Cost of 800 mm dia M.S.barrel

1.30 Mts

Cost of 100 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

37.00
Cost of

Data - MS TEEs

800x800x100 mm dia M.S Tee

Page 3173 of 3205


j

750x750x200 mm dia M.S Tee


Dia of Main barral
Dia of branch barral
Length of the Main barral
Length of the branch barral
Cost of 750 mm dia M.S.barrel
Cost of 200 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

750 mm
200 mm
1400 mm
300 mm
1.40 Mts
0.30 Mts

74.00
Cost of

750x750x200 mm dia M.S Tee

700x700x100 mm dia M.S Tee


Dia of Main barral
Dia of branch barral
Length of the Main barral
Length of the branch barral
Cost of 700 mm dia M.S.barrel
Cost of 100 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

700 mm
100 mm
1300 mm
300 mm
1.30 Mts
0.30 Mts

700x700x100 mm dia M.S Tee

600x600x100 mm dia M.S Tee


Dia of Main barral

600 mm

or

Dia of branch barral

100 mm

or

1300 mm

or

Length of the branch barral

300 mm

or

Cost of 600 mm dia M.S.barrel

1.30 Mts

Cost of 100 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

37.00
Cost of

or
or
or
or
@
@
37.00

Cost of
k

or
or
or
or
@
@

600x600x100 mm dia M.S Tee

500x500x100 mm dia M.S Tee


Dia of Main barral

500 mm

or

Dia of branch barral

100 mm

or

1300 mm

or

Length of the branch barral

300 mm

or

Cost of 500 mm dia M.S.barrel

1.30 Mts

Cost of 100 mm dia M.S.barrel

0.30 Mts

Length of the Main barral

Add welding charges for 1 joint (3.142*d*3.28*3*12)

37.00
Cost of

Data - MS TEEs

500x500x100 mm dia M.S Tee

Page 3174 of 3205

welding (ERW) or submerged arc welding (SAW) process


62, grade -A/B in suitable lengths to suit the site conditions as
coats of epoxy paint of approved quality as per specifications,
ed materials inclusive of all taxes and duties and delivery of
enches keeping in position on ready built, pedestals or support
g inclusive of all jointing materials and labour charges. and all

1.20 Mts
0.80 Mts
2.00 Mts
0.30 Mts
20478.61

1 Rmt

40957.00

13693.69

1 Rmt

4108.00

1 Each

297.00

297.00

0 mm dia M.S Tee

Rs

45362.00

1.10 Mts
0.80 Mts
2.00 Mts
0.30 Mts
18718.74

1 Rmt

37437.00

13693.69

1 Rmt

4108.00

1 Each

297.00

297.00

0 mm dia M.S Tee

Rs

41842.00

1.00 Mts
0.80 Mts
2.00 Mts
0.30 Mts
17038.93

1 Rmt

34078.00

12765.80

1 Rmt

3830.00

1 Each

297.00

297.00

750 mm dia M.S Tee

Rs

38205.00

Data - MS TEEs

Page 3175 of 3205

0.90 Mts
0.60 Mts
1.80 Mts
0.30 Mts
15305.29

1 Rmt

27550.00

10394.22

1 Rmt

3118.00

1 Each

223.00

223.00

0 mm dia M.S Tee

Rs

0.80 Mts
0.60 Mts
1.80 Mts
0.30 Mts
13693.69
1 Rmt
10394.22
1 Rmt
223.00

1 Each

mm dia M.S Tee

Rs

0.70 Mts
0.60 Mts
1.80 Mts
0.30 Mts
12765.80
1 Rmt
10394.22
1 Rmt
223.00

1 Each

0 mm dia M.S Tee

Rs

30891.00

24649.00
3118.00
223.00
27990.00

22978.00
3118.00
223.00
26319.00

0.60 Mts
0.60 Mts
1.80 Mts
0.30 Mts
10394.22

1 Rmt

18710.00

10394.22

1 Rmt

3118.00

1 Each

223.00

223.00

mm dia M.S Tee

Rs

22051.00

Data - MS TEEs

Page 3176 of 3205

Data - MS TEEs

Page 3177 of 3205

0.50 Mts
0.45 Mts
1.65 Mts
0.30 Mts
8777.65

1 Rmt

14483.00

8777.65

1 Rmt

2633.00

1 Each

167.00

167.00

mm dia M.S Tee

Rs

17283.00

0.50 Mts
0.35 Mts
1.55 Mts
0.30 Mts
8777.65

1 Rmt

13605.00

6178.39

1 Rmt

1854.00

1 Each

130.00

130.00

mm dia M.S Tee

Rs

15589.00

0.45 Mts
0.30 Mts
1.50 Mts
0.30 Mts
8777.65

1 Rmt

13166.00

5364.01

1 Rmt

1609.00

111.00

mm dia M.S Tee

Each
Rs

111.00
14886.00

1.20 Mts
0.15 Mts
1.35 Mts
0.30 Mts
20478.61

1 Rmt

27646.00

3007.00

1 Rmt

902.00

1 Each

56.00

56.00

0 mm dia M.S Tee

Rs

28604.00

Data - MS TEEs

Page 3178 of 3205

1.10 Mts
0.15 Mts
1.35 Mts
0.30 Mts
18718.74

1 Rmt

25270.00

3007.00

1 Rmt

902.00

1 Each

56.00

56.00

0 mm dia M.S Tee

Rs

26228.00

1.00 Mts
0.15 Mts
1.35 Mts
0.30 Mts
17038.93

1 Rmt

23003.00

3007.00

1 Rmt

902.00

1 Each

56.00

56.00

0 mm dia M.S Tee

Rs

23961.00

0.90 Mts
0.15 Mts
1.35 Mts
0.30 Mts
15305.29

1 Rmt

20662.00

3007.00

1 Rmt

902.00

1 Each

56.00

56.00

mm dia M.S Tee

Rs

21620.00

0.80 Mts
0.10 Mts
1.30 Mts
0.30 Mts

37.00

mm dia M.S Tee

13693.69

1 Rmt

17802.00

2191.00

1 Rmt

657.00

1 Each

37.00

Rs

18496.00

Data - MS TEEs

Page 3179 of 3205

0.75 Mts
0.20 Mts
1.40 Mts
0.30 Mts
10605.00
1 Rmt
2191.00
1 Rmt
74.00

1 Each

mm dia M.S Tee

Rs
0.70 Mts
0.10 Mts
1.30 Mts
0.30 Mts
12022.37
1 Rmt
2191.00
1 Rmt

37.00

1 Each

mm dia M.S Tee

Rs

14847.00
657.00
74.00
15578.00

15629.00
657.00
37.00
16323.00

0.60 Mts
0.10 Mts
1.30 Mts
0.30 Mts
10394.22

1 Rmt

13512.00

2191.00

1 Rmt

657.00

1 Each

37.00

37.00

mm dia M.S Tee

Rs

14206.00

0.50 Mts
0.10 Mts
1.30 Mts
0.30 Mts

37.00

mm dia M.S Tee

8777.65

1 Rmt

11411.00

2191.00

1 Rmt

657.00

1 Each

37.00

Rs

12105.00

Data - MS TEEs

Page 3180 of 3205


23

Manufacturing, supply of MS Specials manufactured by electric resistant welding (ERW) or submerged arc weld
spirally welded from 10mm thick MS plates conforming to IS 2062, grade -A/B in suitable lengths to suit the
departmental officers incluidng inlinining and outcoating with Two coats of epoxy paint of approved quality as pe
plates, welding rods, cement, steel and all other required materials inclusive of all taxes and duties and delivery of f
and carefully lowering in to ready made trenches keeping in position on ready built, pedestals or support and layin
perfect lining by jacking and jointing inclusive of all jointing materials and labour charges. and all other incidential an

Mild Steel Bends


1

1200mm dia bends

1200mm dia 0 to 30 Deg.Bends


Dia of bend

1200 mm

Equalant length of barral

2x

Cost of 1200 mm dia M.S.barrel

1.68 Mts

Add welding charges for 1 joint (3.142*d*3.28*3*12)

1200mm dia 0 to 30 Deg.Bends

1200 mm

Equalant length of barral

2.28 Mts

Add welding charges for 2 joints


=2x (3.142*d*3.28*3*12)

1200mm dia 61 to 90 Deg. Bends


Dia of bend

2.44 Mts

Add welding charges for 3 joints


=3x (3.142*d*3.28*3*12)

1.22
@
1335.00

Cost of

1100mm dia 0 to 30 Deg.Bends

or

2x

Cost of 1200 mm dia M.S.barrel

1200mm dia 31 to 60 Deg.Bends

1200 mm

Equalant length of barral

1100mm dia bends

1.14

890.00
Cost of

or

2x

Cost of 1200 mm dia M.S.barrel

Dia of bend

1200mm dia 61 to 90 Deg. Bends

1100 mm

Equalant length of barral

or

2x

Cost of 1100 mm dia M.S.barrel

1.68 Mts

Add welding charges for 1 joint (3.142*d*3.28*3*12)

0.84
@
408.00

Cost of
b

1200mm dia 31 to 60 Deg.Bends


Dia of bend

0.84

445.00
Cost of

or

1100mm dia 0 to 30 Deg.Bends

1100mm dia 31 to 60 Deg.Bends


Dia of bend

1200 mm

Data - MS Bends

or

Page 3181 of 3205


Equalant length of barral

2x

Cost of 1200 mm dia M.S.barrel

2.28 Mts

Add welding charges for 2 joints


=2x (3.142*d*3.28*3*12)

1.14
@
890.00

Cost of

Data - MS Bends

1100mm dia 31 to 60 Deg.Bends

Page 3182 of 3205


c

1100mm dia 61 to 90 Deg. Bends


Dia of bend

1200 mm

Equalant length of barral

or

2x

Cost of 1200 mm dia M.S.barrel

2.44 Mts

Add welding charges for 3 joints


=3x (3.142*d*3.28*3*12)

1.22
@
1335.00

Cost of

1100mm dia 61 to 90 Deg. Bends

2 1000 mm dia bends


a

1000mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 1000 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

1000 mm
2x
1.52 Mts

1000mm dia 0 to 30 Deg.Bends

1000mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 1000 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

1000 mm
2x
2.08 Mts

or
1.04
@
742.00

Cost of
c

0.76
@
371.00

Cost of
b

or

1000mm dia 61 to 90 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 1000 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

1000mm dia 31 to 60 Deg.Bends

1000 mm
2x
3.00 Mts

or
1.50
@
1113.00

Cost of

1000mm dia 61 to 90 Deg.Bends

3 900 mm dia bends


a

900mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 900 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

900 mm
2x
1.22 Mts

0.61
@
334.00

Cost of
b

or

900mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 900 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

900mm dia 0 to 30 Deg.Bends

900 mm
2x
1.82 Mts

or
0.91
@
668.00

Data - MS Bends

Page 3183 of 3205


Cost of
c

900mm dia 61 to 90 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 900 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

900mm dia 31 to 60 Deg.Bends

900 mm
2x
2.60 Mts

or
1.30
@
1002.00

Cost of

Data - MS Bends

900mm dia 61 to 90 Deg.Bends

Page 3184 of 3205


4 800 mm dia bends
a

800mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 800 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

800 mm
2x
1.22 Mts

800mm dia 0 to 30 Deg.Bends

800mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 800 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

800 mm
2x
1.68 Mts

or
0.84
@
594.00

Cost of
c

0.61
@
297.00

Cost of
b

or

800mm dia 31 to 60 Deg.Bends

800mm dia 61 to 90 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 800 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

800 mm
2x
2.40 Mts

or
1.20
@
891.00

Cost of

800mm dia 61 to 90 Deg.Bends

5 750 mm dia bends


a

750mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 750 mm dia M.S.barrel

750 mm
2x
1.22 Mts

Add welding charges for 1 joint (3.142*d*3.28*3*12)

750mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 750 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

750mm dia 0 to 30 Deg.Bends

750 mm
2x
1.68 Mts

or
0.84
@
556.00

Cost of
c

0.61
@
278.00

Cost of
b

or

750mm dia 31 to 60 Deg.Bends

750mm dia 61 to 90 Deg. Bends


Dia of bend
Equalant length of barral
Cost of 750 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

750 mm
2x
2.40 Mts

or
1.20
@
834.00

Data - MS Bends

Page 3185 of 3205


Cost of

Data - MS Bends

750mm dia 61 to 90 Deg. Bends

Page 3186 of 3205


6 700 mm dia bends
a

700mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 700 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

700 mm
2x
1.22 Mts

700mm dia 0 to 30 Deg.Bends

700mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 700 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

700 mm
2x
1.68 Mts

or
0.84
@
520.00

Cost of
c

0.61
@
260.00

Cost of
b

or

700mm dia 31 to 60 Deg.Bends

700mm dia 61 to 90 Deg. Bends


Dia of bend
Equalant length of barral
Cost of 700 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

700 mm
2x
2.28 Mts

or
1.14
@
780.00

Cost of

700mm dia 61 to 90 Deg. Bends

7 600 mm dia bends


a

600mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 600 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

600 mm
2x
1.06 Mts

600mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 600 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

600mm dia 0 to 30 Deg.Bends

600 mm
2x
1.38 Mts

or
0.69
@
446.00

Cost of
c

0.53
@
223.00

Cost of
b

or

600mm dia 31 to 60 Deg.Bends

600mm dia 61 to 90 Deg. Bends


Dia of bend
Equalant length of barral

600 mm
2x

or

Cost of 600 mm dia M.S.barrel

1.98 Mts

Add welding charges for 3 joints


=3x (3.142*d*3.28*3*12)

0.99

669.00
Cost of

Data - MS Bends

600mm dia 61 to 90 Deg. Bends

Page 3187 of 3205


8 500 mm dia bends
a

500mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 500 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

500 mm
2x
0.92 Mts

500 mm
2x
1.38 Mts

0.69
@

500mm dia 31 to 60 Deg.Bends

500mm dia 61 to 90 Deg. Bends


Dia of bend
Equalant length of barral
Cost of 500 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

500 mm
2x
1.82 Mts

or
0.91
@
558.00

Cost of
9

450 mm dia bends

450mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 450 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

500mm dia 61 to 90 Deg. Bends

450 mm
2x
0.92 Mts

or
0.46
@
167.00

Cost of
450mm dia 31 to 60 Deg.Bends
Dia of bend
Equalant length of barral
Cost of 450 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

450mm dia 0 to 30 Deg.Bends

450 mm
2x
1.22 Mts

or
0.61
@
334.00

Cost of
c

or

372.00
Cost of

500mm dia 0 to 30 Deg.Bends

500mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 500 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

0.46
@
186.00

Cost of
b

or

450mm dia 61 to 90 Deg. Bends


Dia of bend
Equalant length of barral
Cost of 450 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

450mm dia 31 to 60 Deg.Bends

450 mm
2x
1.68 Mts

or
0.84
@
501.00

Cost of

Data - MS Bends

450mm dia 61 to 90 Deg. Bends

Page 3188 of 3205


10

400 mm dia bends

400mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 400 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

400 mm
2x
0.92 Mts

400mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 400 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

400mm dia 61 to 90 Deg. Bends


Dia of bend
Equalant length of barral
Cost of 400 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

0.61
@

400mm dia 31 to 60 Deg.Bends

400 mm
2x
1.68 Mts

or
0.84
@
444.00

11

350 mm dia bends

350mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 350 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

400mm dia 61 to 90 Deg. Bends

350 mm
2x
0.92 Mts

or
0.46
@
130.00

Cost of
350mm dia 31 to 60 Deg.Bends
Dia of bend
Equalant length of barral
Cost of 350 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

350mm dia 0 to 30 Deg.Bends

350 mm
2x
1.22 Mts

or
0.61
@
260.00

Cost of
c

or

296.00

Cost of

400mm dia 0 to 30 Deg.Bends

400 mm
2x
1.22 Mts

Cost of
c

0.46
148.00

Cost of
b

or

350mm dia 61 to 90 Deg. Bends


Dia of bend
Equalant length of barral
Cost of 350 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

350mm dia 31 to 60 Deg.Bends

350 mm
2x
1.68 Mts

or
0.84
@
390.00

Cost of

Data - MS Bends

350mm dia 61 to 90 Deg. Bends

Page 3189 of 3205


12

300 mm dia bends

300mm dia 0 to 30 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 300 mm dia M.S.barrel
Add welding charges for 1 joint (3.142*d*3.28*3*12)

300 mm
2x
0.76 Mts

300mm dia 31 to 60 Deg.Bends


Dia of bend
Equalant length of barral
Cost of 300 mm dia M.S.barrel
Add welding charges for 2 joints
=2x (3.142*d*3.28*3*12)

300mm dia 0 to 30 Deg.Bends

300 mm
2x
0.92 Mts

or
0.46
@
222.00

Cost of
c

0.38
@
111.00

Cost of
b

or

300mm dia 61 to 90 Deg. Bends


Dia of bend
Equalant length of barral
Cost of 300 mm dia M.S.barrel
Add welding charges for 3 joints
=3x (3.142*d*3.28*3*12)

300mm dia 31 to 60 Deg.Bends

300 mm
2x
1.38 Mts

or
0.69
@
333.00

Cost of

Data - MS Bends

300mm dia 61 to 90 Deg. Bends

Page 3190 of 3205

(ERW) or submerged arc welding (SAW) process longtiduinally or


in suitable lengths to suit the site conditions as directed by the
paint of approved quality as per specifications, including cost of MS
axes and duties and delivery of fabricated MS specials to site hosting
pedestals or support and laying true to alignment and gradient and
rges. and all other incidential and operational charges etc., complete.

ds

1.20 Mts
1.68 Mts
20478.61

1 Rmt

45.00

34404.00

1 Each

dia 0 to 30 Deg.Bends

Rs

445.00
34849.00

1.20 Mts
2.28 Mts
20478.61

90.00

1 Rmt

46691.00

1 Each

o 60 Deg.Bends

Rs

890.00
47581.00

1.20 Mts
2.44 Mts
20478.61

335.00

1 Rmt

49968.00

1 Each

1335.00

ia 61 to 90 Deg. Bends

Rs

51303.00

1.10 Mts
1.68 Mts
18718.74

1 Rmt

08.00

31447.00

1 Each

dia 0 to 30 Deg.Bends

Rs

408.00
31855.00

1.20 Mts

Data - MS Bends

90.00

o 60 Deg.Bends

Page 3191 of 3205


2.28 Mts
18718.74

1 Rmt

42679.00

1 Each
Rs

890.00
43569.00

Data - MS Bends

Page 3192 of 3205

1.20 Mts
2.44 Mts
18718.74

335.00

1 Rmt

45674.00

1 Each

1335.00

ia 61 to 90 Deg. Bends

Rs

1.00 Mts
1.52 Mts
17038.93

1 Rmt

71.00

25899.00

1 Each

dia 0 to 30 Deg.Bends

Rs

371.00
26270.00

1.00 Mts
2.08 Mts
17038.93

1 Rmt

42.00

35441.00

1 Each

ia 31 to 60 Deg.Bends

Rs

742.00
36183.00

1.00 Mts
3.00 Mts
17038.93

113.00

1 Rmt

51117.00

1 Each

1113.00

ia 61 to 90 Deg.Bends

Rs

52230.00

0.90 Mts
1.22 Mts
15305.29

1 Rmt

34.00

18672.00

1 Each

dia 0 to 30 Deg.Bends

68.00

47009.00

Rs

334.00
19006.00

0.90 Mts
1.82 Mts
15305.29

1 Rmt
1 Each

27856.00
668.00

Data - MS Bends

Page 3193 of 3205

a 31 to 60 Deg.Bends

Rs

28524.00

0.90 Mts
2.60 Mts
15305.29

002.00

a 61 to 90 Deg.Bends

1 Rmt

39794.00

1 Each

1002.00

Rs

40796.00

Data - MS Bends

Page 3194 of 3205

0.80 Mts
1.22 Mts
13693.69

1 Rmt

97.00

1 Each

dia 0 to 30 Deg.Bends

Rs

297.00
17003.00

0.80 Mts
1.68 Mts
13693.69

1 Rmt

94.00

23005.00

1 Each

a 31 to 60 Deg.Bends

Rs

594.00
23599.00

0.80 Mts
2.40 Mts
13693.69

1 Rmt

91.00

32865.00

1 Each

a 61 to 90 Deg.Bends

Rs

891.00
33756.00

0.75 Mts
1.22 Mts
10605.00

1 Rmt

78.00

12938.00

1 Each

dia 0 to 30 Deg.Bends

Rs

278.00
13216.00

0.75 Mts
1.68 Mts
10605.00

1 Rmt

56.00

17816.00

1 Each

a 31 to 60 Deg.Bends

34.00

16706.00

Rs

556.00
18372.00

0.75 Mts
2.40 Mts
10605.00

1 Rmt
1 Each

25452.00
834.00

Data - MS Bends

a 61 to 90 Deg. Bends

Page 3195 of 3205


Rs

26286.00

Data - MS Bends

Page 3196 of 3205

0.70 Mts
1.22 Mts
12022.37

1 Rmt

60.00

14667.00

1 Each

dia 0 to 30 Deg.Bends

Rs

260.00
14927.00

0.70 Mts
1.68 Mts
12022.37

1 Rmt

20.00

20198.00

1 Each

a 31 to 60 Deg.Bends

Rs

520.00
20718.00

0.70 Mts
2.28 Mts
12022.37

1 Rmt

80.00

27411.00

1 Each

a 61 to 90 Deg. Bends

Rs

780.00
28191.00

0.60 Mts
1.06 Mts
10394.22

1 Rmt

23.00

11018.00

1 Each

dia 0 to 30 Deg.Bends

Rs

223.00
11241.00

0.60 Mts
1.38 Mts
10394.22

1 Rmt

46.00

14344.00

1 Each

a 31 to 60 Deg.Bends

Rs

446.00
14790.00

0.60 Mts
1.98 Mts
10394.22

69.00

a 61 to 90 Deg. Bends

1 Rmt

20581.00

1 Each
Rs

669.00
21250.00

Data - MS Bends

Page 3197 of 3205

0.50 Mts
0.92 Mts
8777.65

86.00

1 Rmt

8075.00

1 Each

186.00

dia 0 to 30 Deg.Bends

Rs

8261.00

0.50 Mts
1.38 Mts
8777.65

1 Rmt

72.00

12113.00

1 Each

a 31 to 60 Deg.Bends

Rs

372.00
12485.00

0.50 Mts
1.82 Mts
8777.65

1 Rmt

58.00

15975.00

1 Each

a 61 to 90 Deg. Bends

Rs

558.00
16533.00

0.45 Mts
0.92 Mts
7883.48

67.00

1 Rmt

7253.00

1 Each

167.00

dia 0 to 30 Deg.Bends

Rs

7420.00

0.45 Mts
1.22 Mts
7883.48

34.00

1 Rmt

9618.00

1 Each

334.00

a 31 to 60 Deg.Bends

Rs

9952.00

0.45 Mts
1.68 Mts
7883.48

01.00

a 61 to 90 Deg. Bends

1 Rmt

13244.00

1 Each
Rs

501.00
13745.00

Data - MS Bends

Page 3198 of 3205

0.40 Mts
0.92 Mts
7016.43

48.00

1 Rmt

6455.00

1 Each

148.00

dia 0 to 30 Deg.Bends

Rs

6603.00

0.40 Mts
1.22 Mts
7016.43

96.00

1 Rmt

8560.00

1 Each

296.00

a 31 to 60 Deg.Bends

Rs

8856.00

0.40 Mts
1.68 Mts
7016.43

1 Rmt

44.00

11788.00

1 Each

a 61 to 90 Deg. Bends

Rs

444.00
12232.00

0.35 Mts
0.92 Mts
6178.39

30.00

1 Rmt

5684.00

1 Each

130.00

dia 0 to 30 Deg.Bends

Rs

5814.00

0.35 Mts
1.22 Mts
6178.39

60.00

1 Rmt

7538.00

1 Each

260.00

a 31 to 60 Deg.Bends

Rs

7798.00

0.35 Mts
1.68 Mts
6178.39

90.00

a 61 to 90 Deg. Bends

1 Rmt

10380.00

1 Each
Rs

390.00
10770.00

Data - MS Bends

Page 3199 of 3205

0.30 Mts
0.76 Mts
5364.01

1 Rmt

11.00

4077.00

1 Each

dia 0 to 30 Deg.Bends

Rs

111.00
4188.00

0.30 Mts
0.92 Mts
5364.01

22.00

1 Rmt

4935.00

1 Each

222.00

a 31 to 60 Deg.Bends

Rs

5157.00

0.30 Mts
1.38 Mts
5364.01

33.00

a 61 to 90 Deg. Bends

1 Rmt

7402.00

1 Each

333.00

Rs

7735.00

Data - MS Bends

Manufacturing, supply of MS Specials manufactured by electric resistant welding (ERW) or submerged a


longtiduinally or spirally welded from 10mm thick MS plates conforming to IS 2062, grade -A/B in suitable lengths
directed by the departmental officers incluidng inlinining and outcoating with Two coats of epoxy paint of approved q
including cost of MS plates, welding rods, cement, steel and all other required materials inclusive of all taxes
fabricated MS specials to site hosting and carefully lowering in to ready made trenches keeping in position on read
and laying true to alignment and gradient and perfect lining by jacking and jointing inclusive of all jointing materials
other incidential and operational charges etc., complete.

Mild Steel Tapers


a

1200 x 800 mm dia M.S Taper

1.20

0.80

Length of Taper

1500 mm

or

Cost of 1200 mm dia M.S.barrel

1.00 Mts

Cost of 800mm dia M.S.barral

1.00 Mts

Cost of Taper

1.50 Mts

Add welding charges (3.142*d*3.28*3*12)

1.20 dia

Add welding charges (3.142*d*3.28*3*12)

0.80 dia

Total
Average Rate per 1 Rmt
Abstract

Cost of
b

800 x 750 mm dia M.S Taper

0.80

Length of Taper
Cost of 800 mm dia M.S.barrel
Cost of 750mm dia M.S.barral
Total
Average Rate per 1 Rmt
Abstract
Cost of Taper
Add welding charges (3.142*d*3.28*3*12)
Add welding charges (3.142*d*3.28*3*12)

x
750 mm
1.00 Mts
1.00 Mts

Cost of
c

1200 x 800 mm dia M.S Taper

800 x 500 mm dia M.S Taper


Length of Taper
Cost of 800 mm dia M.S.barrel
Cost of 500mm dia M.S.barral
Total
Average Rate per 1 Rmt
Abstract
Cost of Taper
Add welding charges (3.142*d*3.28*3*12)
Add welding charges (3.142*d*3.28*3*12)

or
@
@

0.75 Mts
@
0.80 dia
@
0.75 dia
@
800 x 750 mm dia M.S Taper
0.80
x
1250 mm
1.00 Mts
1.00 Mts

Cost of

0.75

0.50
or
@
@

1.25 Mts
@
0.80 dia
@
0.50 dia
@
800 x 500 mm dia M.S Taper

750 x 600 mm dia M.S Taper


Length of Taper
Cost of 750 mm dia M.S.barrel
Cost of 600mm dia M.S.barral
Total
Average Rate per 1 Rmt
Abstract
Cost of Taper
Add welding charges (3.142*d*3.28*3*12)
Add welding charges (3.142*d*3.28*3*12)

0.75
x
1250 mm
1.00 Mts
1.00 Mts

Cost of
e

600 x 300 mm dia M.S Taper


Length of Taper
Cost of 600 mm dia M.S.barrel
Cost of 300mm dia M.S.barral
Total
Average Rate per 1 Rmt
Abstract
Cost of Taper
Add welding charges (3.142*d*3.28*3*12)
Add welding charges (3.142*d*3.28*3*12)

500 x 450 mm dia M.S Taper


Length of Taper
Cost of 500 mm dia M.S.barrel
Cost of 450mm dia M.S.barral
Total
Average Rate per 1 Rmt
Abstract
Cost of Taper
Add welding charges (3.142*d*3.28*3*12)
Add welding charges (3.142*d*3.28*3*12)

500 x 350 mm dia M.S Taper


Length of Taper
Cost of 500 mm dia M.S.barrel
Cost of 350mm dia M.S.barral
Total
Average Rate per 1 Rmt
Abstract
Cost of Taper
Add welding charges (3.142*d*3.28*3*12)
Add welding charges (3.142*d*3.28*3*12)

450 x 300 mm dia M.S Taper


Length of Taper
Cost of 500 mm dia M.S.barrel
Cost of 350mm dia M.S.barral
Total
Average Rate per 1 Rmt
Abstract
Cost of Taper
Add welding charges (3.142*d*3.28*3*12)

0.45
or
@
@

1.25 Mts
@
0.50 dia
@
0.45 dia
@
500 x 450 mm dia M.S Taper
0.50
x
1250 mm
1.00 Mts
1.00 Mts

Cost of

0.30
or
@
@

1.50 Mts
@
0.60 dia
@
0.30 dia
@
600 x 300 mm dia M.S Taper
0.50
x
1250 mm
1.00 Mts
1.00 Mts

Cost of
g

1.25 Mts
@
0.75 dia
@
0.60 dia
@
750 x 600 mm dia M.S Taper
0.60
x
1500 mm
1.00 Mts
1.00 Mts

Cost of

0.60
or
@
@

0.35
or
@
@

1.25 Mts
@
0.50 dia
@
0.35 dia
@
500 x 350 mm dia M.S Taper
0.45
x
1250 mm
1.00 Mts
1.00 Mts

1.25 Mts
0.45 dia

0.30
or
@
@

@
@

Add welding charges (3.142*d*3.28*3*12)


Cost of

0.30 dia
@
450 x 300 mm dia M.S Taper

welding (ERW) or submerged arc welding (SAW) process


62, grade -A/B in suitable lengths to suit the site conditions as
coats of epoxy paint of approved quality as per specifications,
ed materials inclusive of all taxes and duties and delivery of
enches keeping in position on ready built, pedestals or support
g inclusive of all jointing materials and labour charges. and all

1.50 Mts
20478.61

1 Rmt

20479.00

13693.69

1 Rmt

13694.00
34173.00
Rs.

17086.50

25630.00

445.00

1 Each

445.00

297.00

1 Each

297.00

m dia M.S Taper

Rs

26372.00

0.75 Mts
13693.69
1 Rmt
12765.80
1 Rmt
Rs.
13230.00
297.00
278.00

dia M.S Taper

dia M.S Taper

1 Rmt

17086.50

1 Rmt
1 Each
1 Each
Rs

9923.00
297.00
278.00
10498.00

1.25 Mts
13693.69
1 Rmt
8777.65
1 Rmt
Rs.
11236.00
297.00
186.00

1 Rmt
1 Each
1 Each
Rs

13694.00
12766.00
26460.00
13230.00

13694.00
8778.00
22472.00
11236.00
14045.00
297.00
186.00
14528.00

1.25 Mts
12765.80
1 Rmt
10394.22
1 Rmt
Rs.
11580.00
278.00
223.00

dia M.S Taper

1 Rmt
1 Each
1 Each
Rs

14475.00
278.00
223.00
14976.00

1.50 Mts
10394.22
1 Rmt
5364.01
1 Rmt
Rs.
7879.00
223.00
111.00

dia M.S Taper

1 Rmt
1 Each
1 Each
Rs

Rs.

dia M.S Taper

1 Rmt
1 Each
1 Each
Rs

Rs.

dia M.S Taper

1 Rmt
1 Each
1 Each
Rs

Rs.
1 Rmt
1 Each

8331.00
6178.00
14509.00
7254.50
9068.00
186.00
130.00
9384.00

1.25 Mts
7883.48
1 Rmt
5364.01
1 Rmt

6623.50
167.00

8778.00
7883.00
16661.00
8330.50
10413.00
186.00
167.00
10766.00

1.25 Mts
8330.50
1 Rmt
6178.39
1 Rmt

7254.50
186.00
130.00

10394.00
5364.00
15758.00
7879.00
11819.00
223.00
111.00
12153.00

1.25 Mts
8777.65
1 Rmt
7883.48
1 Rmt

8330.50
186.00
167.00

12766.00
10394.00
23160.00
11580.00

7883.00
5364.00
13247.00
6623.50
8279.00
167.00

dia M.S Taper

111.00

1 Each
Rs

111.00
8557.00

S-ar putea să vă placă și