4200-A-001 STRESS ANALYSIS TRACKING SHEET - RAPID PROJECT

REV A - IFR
No

Document No

Calc No

Description

Received FDND (Partial Submissions) 1


Date

GTW Case No

Transmittal No

Sent FDND

Received FDND (Complete Submissions) 2


Date

GTW Case No

Transmittal No

Returned FDND

Date

Commented

Date

Incorporated

Sent OUIJV
Date

Returned OUIJV

GTW Case No

Date

Commented

Remarks

RAPID-P0014-7003-PIP-CAL-4200-1012

4200-CN-101

Stress Calculation Sulphuric Acid Dosing System Neutralisation Dosing Pump Level 3
4200-CN-101

8/12/2016

11858

TR20160812133328

11/9/2016

9/3/2016

Partial submission reviewed with OUIJV comments included.

RAPID-P0014-7003-PIP-CAL-4200-1013

4200-CN-102

Stress Calculation Caustic Soda Dosing System Neutralisation Dosing Pump Level 3
4200-CN-102

8/15/2016

11854

TR20160812215526

11/8/2016

9/3/2016

Partial submission reviewed with OUIJV comments included.

RAPID-P0014-7003-PIP-CAL-4200-1014

4200-CN-103

Stress Calculation Sulphuric Acid Dosing System MB Regeneration Dosing Pump Level
3 4200-CN-103

RAPID-P0014-7003-PIP-CAL-4200-1015

4200-CN-104

Stress Calculation Caustic Soda Dosing System MB Regeneration Dosing Pump Level 3
4200-CN-104

RAPID-P0014-7003-PIP-CAL-4200-1016

4200-CN-105

Stress Calculation Neutralised Effluents Transfer Pump & MB Regeneration


Neutralisation PIT Level 3 4200-CN-105

RAPID-P0014-7003-PIP-CAL-4200-1017

4200-CN-106

Stress Calculation Air Scour Blower Level 3 4200-CN-106

8/8/2016

11680

TR20160808175339

11/2/2016

8/23/2016

Partial submission reviewed with OUIJV comments included.

RAPID-P0014-7003-PIP-CAL-4200-1018

4200-CN-107

Stress Calculation Resin Cleaning System Circulating Pump Level 3 4200-CN-107

RAPID-P0014-7003-PIP-CAL-4200-1019

4200-CN-108

Stress Calculation Automatic Backwash Filter Level 3 4200-CN-108

10/11/2016

13823

TR20161020095936

10/19/2016

10/24/2016

8910

7/30/2016

FDND to comply to the ABF nozzle allowable based on vendor's confirmation. Refer email attached.

RAPID-P0014-7003-PIP-CAL-4200-1020

4200-CN-109

Stress Calculation MB Service Outlet Header Level 3 4200-CN-109

10/25/2016

14376

TR20161024192136

11/15/2016

10/25/2016

8910

8/10/2016

10

RAPID-P0014-7003-PIP-CAL-4200-1021

4200-CN-110

Stress Calculation Cartridge Filter & Mixed Bed Exchanger Level 3 4200-CN-110

8/11/2016

4200-CN-111

Stress Calculation Automatic Backwash Filter & Activated Carbon Filter Level 3 4200CN-111

11

RAPID-P0014-7003-PIP-CAL-4200-1022

11
Note (s):
1) Calculation received NOT COMPLETE as per OUI JV submission requirements.
2) Calculation received COMPLETE as per OUI JV submission requirements.

Total Calculations

8/11/2016

Received (Partial)

Received (Complete)

Sent

Returned

Sent

Returned