DATA
16.7586 cumec
1 Discharge
16.7586 cumec
11.00 m
2 Bed width
250
11000
2x 16 mm top anchor bar
11.00 m
vertical :1
:1
250
TBL 3.00
F.B.
500
FSD
2500
16 mm bars@ 240
F.S.L. 2.5
4 F.S.D.
2.50
2.50
5 Free Board
0.50
0.50
8 mm bars@ 150
6 Bed slope
850
1 in
1 in
850
7 C.B.L.
8 F.S.L.
2.50
2.5
9 M.W.D.
3.00
3.00
0.00
16 mm bars@ 120
16 mm bars@ 480
m
200
16 mmbars@ 240
8 mmbars@110
Hench
10 mm bars@ 300
10 Span
11 Concrete
12 Steel
Mcbc
st
20
7
Inside
150
13 Water
m
20 x Bars
mm
20
2.20
CBL 0
st
wt
720
190
200
200
9800 kg/m3
Main Vertical
16
mm@
120
mm c/c
Disty.
mm@
150
mm c/c
Main
16
mm @
240
mm c/c
Disty.
mm@
110
mm c/c
Main bottom
20
mm
16
mmNos.
mm@
300
mm c/c
20
Nos.
250
mm
or
0.25
mtr
420
mm
or
0.42
mtr
Top anchor
Nos.
TROUGH DESIGN
NAME OF WORK:-
Discharge
Bed width
water Side slope
F.S.D.
Free Board
Bed slope
C.B.L.
F.S.L.
M.W.D.
FOR QUEDUCT
16.7586
cumec
11.00
m
vertical
2.50
m
0.50
m
850
0
m
2.5
m
3.00
m
11.00
m
50
mm
40
mm
Span (Proposed)
Nominal Cover
Effective cover
Concrete M- 20
1 Design Constants:-
st =
cbc =
m
13
m*c
k=
=
m*c+st
j=1-k/3
1 R=1/2xc x j x k
x
0.5
st =
cbc =
m
13
m*c
k=
=
m*c+st
j=1-k/3
1 R=1/2xc x j x k
x
0.5
13
13 x
0.378 /
7
x
x
7
3
0.87
7
+
150
0.378
= 0.378
0.378
= 0.874
= 1.155
J
R
=
=
0.874
1.155
3.00
wh3
B.M.
=
6
= 0.324
0.324
= 0.892
= 1.011
J
R
=
=
0.892
1.011
m
9800 x
6
44100 x
=
1.16 x
cover =
=
3.00 3
44100
N-m
1000
1000
195
mm
50
44100000
n-mm
200 mm
Steel required
Ast =
BMx1000
st x j x D
using 16 mm bars =
Hence Provided
spacing =A/Ast =
16 mm bars @
44100 x 1000
= 1648 mm2
0.892 x 200
3.14xdia2
3.14 x
16
x 16
A
=
=
4
x
100
4
200.96 x 1000 / 1647.89 =
122 mm
mm
c/c
half
the
bars
will
be
curtailed
at
1.70
120
0.1 (
25
10 )
0.3
=
0.26
10
45
150 x
### mm2
m from base
%
using 8
mm bars
spacing =A/Ast
Hence Provided
8
0.26 %
643
2
A
of x section area
321
= 3.14xdia2
=
3.14 x
4 x100
=
50.24 x 1000 /
321.43 = 156.3 mm
mm bars
@ 150 mm c/c Each face
=
Since tension face is on inner side
WL2
8
st
Rxb
367 mm
=
38567
250
100
8
4
1000
643 mm2
50.2 mm2
mm2
0.26
- 50715 =
= 150
50715 x
=
1.011 x
cover =
11.00 m
367
=
9800
1.00
3.00
x
2
11.25
8
11 +
11.25
=
mm
mm
0.25 =
417 mm
11.25 m
=
29400 N
0.3667 = 9166.6667 N
38566.67 N
3.00
=
44100
3.0
3
J=
367
Total thickness =
50715
1000
1000
50
mm say
mm
44100
x
0.3
2
50715 N-m
N-m
224 mm
providing thickness
420 mm
Steel required
50715.00 x 1000
= 809 mm2
190 x
0.89 x 370
3.14xdia2
3.14 x
16
x 16
using 16mm bars =
A
=
=
= 201 mm2
4
x
100
4
spacing =A/Ast =
201
x 1000 /
809
= 248.5 mm
Hence Provided
16 mm bars @
240 mm c/c
50715
x
1000
Area of steel required at end (Near support) =
=
mm2
1055
150
x 0.874 x 367
This is
< than half the steel provided at the center of span,However,
half the bars from the center of the span may be bent up at L/2 meter from supports.
Let us check whether this bending of half bars satisfies the enchorage and devlopments envisaged in
equation M1/V + Lo > Ld
1
1000 x
201
Where M1=
x
x 190 x 0.874 x 367
Ast x st x j x d=
2
240
=
25.50 x 10'6
N-mm
38567 x
11.25
V = shear force at the ends
=
= 216938 N
2
Ast = BMx100/stxjxD=
ls
x'
2
Ls = Length of support
Lo =
Where
M1
V
+ Lo
250
mm
25.50 x 10'6
216938
16
and x' =
250
2
ls
x'
2
side cover =
50
13
+ 13
50
x
16
mm
= 401 mm
=
or
st
4 t bd
46.88
401
0.3
Ld
using 8
mm bars
spacing =A/Ast
Hence Provided
8
=
x
<
-
0.21 %
876
2
A
x
150
See table
Concrete
= 46.88
4
x
0.8
3.4
M 20
16
=
750 mm
750
Thus the requirement is not satisfied
0.1 (
420
100 )
=
0.21 %
100
450
0.21
x
420
x 1000
of x section area
=
= 876 mm2
100
438
= 3.14xdia2
=
3.14 x
4
=
50.24 x 1000 /
438.00 = 115 cm
mm bars
@ 110 cm c/c Each face
190
mm2
N/mm2
WL2
8
= 38566.7 x
=
3.00
x
230867 x
11.00
8
0.324
8
4
50.2 mm2
11
/
2
= 212117 kg-m
0.25 x
25000 = 18750 kg-m
Total Load
= 230867 kg-m
11.00
= 3491858 Kg-m
k=
J = 0.892
3491858 x 1000
=
= 3717 mm
Rxb
1.011 x 250
3.00 + 0.37 =
3.37 or 3366.7 mm
3366.67 mm - (2 x cover =
80
)= 3286.67 mm
R = 1.011
3491858.3 x 1000
= 6268 mm2
190 x
0.892 x 3286.67
using 20 mm bars
A
= 3.14xdia2
=
3.14 x
20
x 20
= 314 mm2
4 x100
4
Nomber of Bars = Ast/A =
6268 /
314 = 19.96
say
=
20 No.
Hence Provided
mm at Bottom
20 bars of
20
20 x
314
% of steel provided =
x
100
= 0.76 %
250
x 3286.67
total load x span
230867 x 11.0
Shear force =
=
= 1269767
kg.
2
2
Shear stress
shea force
1269766.7
=
=
=
1.55
N/mm2
Beam Ht. x Beam Dt.
250
x 3286.7
steel provided tc =
Permissible shear stress for 0.76 %
0.35 N/mm2 (See Table 3.1)
TV
Tc
Shear reinforcenment required if
>
Hence shear reinforcement required
Vc = shear resistance of concrete =
tc.b.d = 0.35 x 3286.67 x 250 = 287583.33 N
Vs = V - V c
=
1269767
287583.333 = 982183 N
st .d.Asv
190
x 3287
Spacing of strirrups is
Sv
Asv
=
=
=
0.64 Asv
Vs
given by
982183
2.175 x
fy
x
Asy
2.175 x
415
x Asv
While maximum permissible
<
<
< 3.61 Asv
spacing of shear stirip is
B
250
Sv
Hence
=
3.61 Asv
Hence using 8 mm dia
2 Legged stirrups A
=
100.5 mm2
Sv
=
3.61 x 100.5 =
363 mm
subject to a max.
= 300 mm
Hence provideed
legged shear stirrus
@ 300 mm c/c
8 mm Dia
2
Provide 2 x 12 mm hoilding bars at the top.
Ast = BMx100/stxjxD=
NAME OF WORK:-
250
250
F.B.
500
FSD
2500
16 mm bars@ 240
F.S.L. 2.5
10 mm bars@ 300
2.20
720
420
200
200
11500
Tensile stress
N/mm2
M-10
M-15
M-20
M-25
M-30
M-35
M-40
1.2
2.0
2.8
3.2
3.6
4.0
4.4
Grade of concrete
Modular ratio m
M-15
19
(18.67)
M-20
13
(13.33)
M-25
11
(10.98)
M-30
9
(9.33)
M-35
8
(8.11)
M-40
7
(7.18)
M-15
M-20
M-25
M-30
M-35
M-40
Modular Ratio
cbc N/mm2
18.67
5
13.33
7
10.98
8.5
9.33
10
8.11
11.5
7.18
13
93.33
93.33
93.33
93.33
93.33
93.33
0.4
0.4
0.4
0.4
0.4
0.4
0.867
0.867
0.867
0.867
0.867
0.867
0.867
1.214
1.474
1.734
1.994
2.254
Pc (%)
0.714
1.214
1.429
1.643
1.857
kc
0.329
0.329
0.329
0.329
0.329
0.329
jc
0.89
0.89
0.89
0.89
0.89
Rc
0.89
0.732
1.025
1.244
1.464
1.684
1.903
Pc (%)
0.433
0.606
0.736
0.866
0.997
1.127
kc
0.289
0.289
0.289
0.289
0.289
0.289
jc
0.904
0.904
0.904
0.904
0.904
0.904
Rc
0.653
0.914
1.11
1.306
1.502
1.698
Pc (%)
0.314
0.44
0.534
0.628
0.722
0.816
m cbc
kc
jc
(a) st = 140
N/mm2 (Fe 250) Rc
(b) st = 190
N/mm2
(c ) st = 230
N/mm2 (Fe 415)
Grade of concrete M
bd
Shear stress tc
100As
M-20
bd
0.15
0.18
0.16
0.18
0.17
0.18
0.18
0.19
0.19
0.19
0.2
0.19
0.21
0.2
0.22
0.2
0.23
0.2
0.24
0.21
0.25
0.21
0.26
0.21
0.27
0.22
0.28
0.22
0.29
0.22
0.3
0.23
0.31
0.23
0.32
0.24
0.33
0.24
0.34
0.24
0.35
0.25
0.36
0.25
0.37
0.25
0.38
0.26
0.39
0.26
0.4
0.26
0.41
0.27
0.42
0.27
0.43
0.27
0.44
0.28
0.45
0.28
0.46
0.28
0.47
0.29
0.48
0.29
0.49
0.29
0.5
0.30
0.51
0.30
0.52
0.30
0.53
0.30
0.54
0.30
0.55
0.31
0.56
0.31
0.57
0.31
0.58
0.31
0.59
0.31
0.6
0.32
0.61
0.32
Reiforcement %
100As
M-20
bd
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
0.32
0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
bd
< 0.15
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
3.00 and above
M-20
0.18
0.22
0.30
0.35
0.39
0.42
0.45
0.47
0.49
0.51
0.51
0.51
0.51
M-25
0.19
0.23
0.31
0.36
0.40
0.44
0.46
0.49
0.51
0.53
0.55
0.56
0.57
M-30
0.2
0.23
0.31
0.37
0.41
0.45
0.48
0.50
0.53
0.55
0.57
0.58
0.6
M-35
0.2
0.23
0.31
0.37
0.42
0.45
0.49
0.52
0.54
0.56
0.58
0.60
0.62
M-40
0.2
0.23
0.32
0.38
0.42
0.46
0.49
0.52
0.55
0.57
0.60
0.62
0.63
200
1.20
175
1.25
1.00
275
1.05
250
1.10
225
1.15
150 or less
1.30
Grade of concrete
c.max
M-20
1.8
M-25
1.9
M-30
2.2
M-35
2.3
M-40
2.5
15
0.6
20
0.8
25
0.9
30
1
35
1.1
40
1.2
bd
H.Y.S.D. Bars
(N / mm2)
kd = Ld
M 15
0.6
58
0.96
60
M 20
0.8
44
1.28
45
M 25
0.9
39
1.44
40
M 30
35
1.6
36
M 35
1.1
32
1.76
33
M 40
1.2
29
1.92
30
M 45
1.3
27
2.08
28
M 50
1.4
25
2.24
26
45
1.3
: 456-2000)
50
1.4