Project : Al Batha Warhouse (Phase 1)

Location : Plot 64 - KHIA 9 -Al Tawelaa Area - Industrial Zone -Khalifa Port - Abu Dhabi
Developer : ADPC
Burjeel
Client

Beam Design

Floors

Hollow core approximate thickness


span

20

thickness

0.50 m

assumed thickness

0.5

topping

10.0 cm

EQUIVILANT loads
ratio HCS 55
ow hcs

0.50

2.5

0.6

0.69

factors

ow topping 0.08

2.5

1.0

0.20

corner

1.2

Note

sidl

0.25

edge

1.15

the ow 0.26 m slab

sill

0.10

inner

1.1

ie 0.15 t/m2 less

1.24
EQ

D40

D30

BEAM Dimensions

PARAPET LOADS

OW

Slab
wt/m2

TRIP

slab
/MR

ww

wu

Mu

Ru

1.10

1.00

2.75

0.00

0.20

0.00

1.24

11.00

13.61

16.36

24.5

1,680

574

1.10

1.00

2.75

0.00

0.20

0.00

1.24

11.00

13.61

16.36

24.5

2,761

736

Span

B27
B27*

23.4
30

Pu

Triputary area

Loads

Actions

0.35*Fcu*Acu + 0.67*As*Fs

Ground beams load


Mez. Slalb lev
SOG level
ne hight
denisty
width
uniform load

3.85
0.35
3.5
1.4
0.2
0.98

October 2013

Project no : 231

BEAM DESIGN AS PER ACI CODE

FLOOR ROOF
27

BEAM

fc=

BEAM LABELWIDTH
Roof Beam

1100

factored momen 16800


m=fy/0.85fc

9.0196078

Rn=Mu/bd2

13.6743

Ro(p)=1/m(1sqrt(1(2mRn/fy)

DEPTH

60 N/mm2

fy= 460 N/mm2

1200 mm
kN.m

bar dia=

32

cover=

30

d= 1114

<

0.0354

0.0377

O.K.

[Ro(max)]

5740

Shear ( max)=

As)reqd=Roxbx 43339.833 mm2

<

53080.35

kN

vc=

1.0929559 N/mm2

33

32

Bott

v=

4.6841848 N/mm2

33

32

Bott

vs(v-vc)=

3.5912289 N/mm2

SECTION OK

O.K.
2

S=.85Avfyd/Vs=

As)req'd covers min reinf. for beam


As)req'd covers min reinf. for slab
Asmin-beam= max(1.4bd/fy,fc^0.5bd/4fy)=

9.0196078

Rn=Mu/bd2

4.5580853

<

Ro(p)=1/m(1- 0.0103963
sqrt(1(2mRn/fy)

As=Robd

15280.71

11

32

Top

32

Top

O.K.

1430 kN.m

m=fy/.85fc

9.0196078

Rn=Mu/bd2

1.1639396

<

Ro(p)=1/m(1- 0.0025599
sqrt(1(2mRn/fy)

As=Robd

O.K.

0.037654 Ro(max)

12739.646 mm2

<

Sup.mom (R )=

Asmin-slab= 0.0018bh*420/fy=

5600 kN.m

m=fy/.85fc

O.K.

0.037654 Ro(max)

3136.8472 mm2
<

5399.612

25

Top

25

Top

O.K.

CHECK SPAN/d RATIO


b=

1100 mm

overall width

d=

1114 mm

effective depth

As reqd=

43339.833 mm2

tension reinforcement

As prov=

53080.349 mm2

tension reinforcement provided

A's=

226.19467 mm2

compression rebar

fy=
M=
span/d ratio=
beam span=

460 N/mm2 reinforcement grade


16800 kN.m

design moment

18.5
5200

mm

fs=

250.39176 N/mm2

M/bd^2=

12.30683

100A's/bd=

0.0184588

MFT=

0.6929868

MFC=

1.0061153 <&=1.5 1+(100A'sprov/bd)/(3+100A'sprov/bd)

Span/d (allowab12.898655
Span/d (actual) 4.6678636

(2/3*fy*Asreqd/Asprov)

<&=2. .55+(477-fs)/120(.9+M/bd^2)

>
O.K.

10
c/c

As)provided covers min reinf. for beam


As)provided covers min reinf. for slab
Sup.mom (L )=

12

5159 mm
2169

mm

BEAM DESIGN AS PER ACI CODE

FLOOR ROOF
13

BEAM N

fc=

BEAM LABELWIDTH
Roof Beam

1100

factored momen 27600


m=fy/0.85fc

9.0196078

Rn=Mu/bd2

13.9436

Ro(p)=1/m(1sqrt(1(2mRn/fy)

DEPTH

60 N/mm2

fy= 460 N/mm2

1500 mm
kN.m

bar dia=

32

cover=

30

d= 1414

<

0.0362

0.0377

O.K.

[Ro(max)]

7360

Shear ( max)=

As)reqd=Roxbx 56356.327 mm2

<

59514.33

kN

vc=

1.0929559 N/mm2

39

32

Bott

v=

4.7319018 N/mm2

35

32

Bott

vs(v-vc)=

3.6389459 N/mm2

SECTION OK

O.K.
2

S=.85Avfyd/Vs=

As)req'd covers min reinf. for beam


As)req'd covers min reinf. for slab
Asmin-beam= max(1.4bd/fy,fc^0.5bd/4fy)=
As)provided covers min reinf. for beam
As)provided covers min reinf. for slab
Sup.mom (L )=

9200 kN.m

m=fy/.85fc

9.0196078

Rn=Mu/bd2

4.6478683

<

Ro(p)=1/m(1- 0.0106119
sqrt(1(2mRn/fy)

As=Robd

24127.43

22

32

Top

32

Top

O.K.

1430 kN.m

m=fy/.85fc

9.0196078

Rn=Mu/bd2

0.7224404

<

Ro(p)=1/m(1- 0.0015818
sqrt(1(2mRn/fy)

As=Robd

O.K.

0.037654 Ro(max)

16505.786 mm2

<

Sup.mom (R )=

Asmin-slab= 0.0018bh*420/fy=

O.K.

0.037654 Ro(max)

2460.3421 mm2
<

5399.612

25

Top

25

Top

O.K.

CHECK SPAN/d RATIO


b=

1100 mm

overall width

d=

1414 mm

effective depth

As reqd=

56356.327 mm2

tension reinforcement

As prov=

59514.331 mm2

tension reinforcement provided

A's=

226.19467 mm2

compression rebar

fy=
M=
span/d ratio=
beam span=

460 N/mm2 reinforcement grade


27600 kN.m

design moment

18.5
5200

mm

fs=

290.39404 N/mm2

M/bd^2=

12.549244

100A's/bd=

0.0145425

MFT=

0.6656236

(2/3*fy*Asreqd/Asprov)

<&=2. .55+(477-fs)/120(.9+M/bd^2)

12

6548
2712

mm

MFC=

1.0048241 <&=1.5 1+(100A'sprov/bd)/(3+100A'sprov/bd)

Span/d (allowab12.373441
Span/d (actual) 3.6775106

>
O.K.

SECTION OK

10
c/c
mm