Documente Academic
Documente Profesional
Documente Cultură
Location : Plot 64 - KHIA 9 -Al Tawelaa Area - Industrial Zone -Khalifa Port - Abu Dhabi
Developer : ADPC
Burjeel
Client
Beam Design
Floors
20
thickness
0.50 m
assumed thickness
0.5
topping
10.0 cm
EQUIVILANT loads
ratio HCS 55
ow hcs
0.50
2.5
0.6
0.69
factors
ow topping 0.08
2.5
1.0
0.20
corner
1.2
Note
sidl
0.25
edge
1.15
sill
0.10
inner
1.1
1.24
EQ
D40
D30
BEAM Dimensions
PARAPET LOADS
OW
Slab
wt/m2
TRIP
slab
/MR
ww
wu
Mu
Ru
1.10
1.00
2.75
0.00
0.20
0.00
1.24
11.00
13.61
16.36
24.5
1,680
574
1.10
1.00
2.75
0.00
0.20
0.00
1.24
11.00
13.61
16.36
24.5
2,761
736
Span
B27
B27*
23.4
30
Pu
Triputary area
Loads
Actions
0.35*Fcu*Acu + 0.67*As*Fs
3.85
0.35
3.5
1.4
0.2
0.98
October 2013
Project no : 231
FLOOR ROOF
27
BEAM
fc=
BEAM LABELWIDTH
Roof Beam
1100
9.0196078
Rn=Mu/bd2
13.6743
Ro(p)=1/m(1sqrt(1(2mRn/fy)
DEPTH
60 N/mm2
1200 mm
kN.m
bar dia=
32
cover=
30
d= 1114
<
0.0354
0.0377
O.K.
[Ro(max)]
5740
Shear ( max)=
<
53080.35
kN
vc=
1.0929559 N/mm2
33
32
Bott
v=
4.6841848 N/mm2
33
32
Bott
vs(v-vc)=
3.5912289 N/mm2
SECTION OK
O.K.
2
S=.85Avfyd/Vs=
9.0196078
Rn=Mu/bd2
4.5580853
<
Ro(p)=1/m(1- 0.0103963
sqrt(1(2mRn/fy)
As=Robd
15280.71
11
32
Top
32
Top
O.K.
1430 kN.m
m=fy/.85fc
9.0196078
Rn=Mu/bd2
1.1639396
<
Ro(p)=1/m(1- 0.0025599
sqrt(1(2mRn/fy)
As=Robd
O.K.
0.037654 Ro(max)
12739.646 mm2
<
Sup.mom (R )=
Asmin-slab= 0.0018bh*420/fy=
5600 kN.m
m=fy/.85fc
O.K.
0.037654 Ro(max)
3136.8472 mm2
<
5399.612
25
Top
25
Top
O.K.
1100 mm
overall width
d=
1114 mm
effective depth
As reqd=
43339.833 mm2
tension reinforcement
As prov=
53080.349 mm2
A's=
226.19467 mm2
compression rebar
fy=
M=
span/d ratio=
beam span=
design moment
18.5
5200
mm
fs=
250.39176 N/mm2
M/bd^2=
12.30683
100A's/bd=
0.0184588
MFT=
0.6929868
MFC=
Span/d (allowab12.898655
Span/d (actual) 4.6678636
(2/3*fy*Asreqd/Asprov)
<&=2. .55+(477-fs)/120(.9+M/bd^2)
>
O.K.
10
c/c
12
5159 mm
2169
mm
FLOOR ROOF
13
BEAM N
fc=
BEAM LABELWIDTH
Roof Beam
1100
9.0196078
Rn=Mu/bd2
13.9436
Ro(p)=1/m(1sqrt(1(2mRn/fy)
DEPTH
60 N/mm2
1500 mm
kN.m
bar dia=
32
cover=
30
d= 1414
<
0.0362
0.0377
O.K.
[Ro(max)]
7360
Shear ( max)=
<
59514.33
kN
vc=
1.0929559 N/mm2
39
32
Bott
v=
4.7319018 N/mm2
35
32
Bott
vs(v-vc)=
3.6389459 N/mm2
SECTION OK
O.K.
2
S=.85Avfyd/Vs=
9200 kN.m
m=fy/.85fc
9.0196078
Rn=Mu/bd2
4.6478683
<
Ro(p)=1/m(1- 0.0106119
sqrt(1(2mRn/fy)
As=Robd
24127.43
22
32
Top
32
Top
O.K.
1430 kN.m
m=fy/.85fc
9.0196078
Rn=Mu/bd2
0.7224404
<
Ro(p)=1/m(1- 0.0015818
sqrt(1(2mRn/fy)
As=Robd
O.K.
0.037654 Ro(max)
16505.786 mm2
<
Sup.mom (R )=
Asmin-slab= 0.0018bh*420/fy=
O.K.
0.037654 Ro(max)
2460.3421 mm2
<
5399.612
25
Top
25
Top
O.K.
1100 mm
overall width
d=
1414 mm
effective depth
As reqd=
56356.327 mm2
tension reinforcement
As prov=
59514.331 mm2
A's=
226.19467 mm2
compression rebar
fy=
M=
span/d ratio=
beam span=
design moment
18.5
5200
mm
fs=
290.39404 N/mm2
M/bd^2=
12.549244
100A's/bd=
0.0145425
MFT=
0.6656236
(2/3*fy*Asreqd/Asprov)
<&=2. .55+(477-fs)/120(.9+M/bd^2)
12
6548
2712
mm
MFC=
Span/d (allowab12.373441
Span/d (actual) 3.6775106
>
O.K.
SECTION OK
10
c/c
mm