Documente Academic
Documente Profesional
Documente Cultură
Appendix A
ENVIRONMENTAL SCREENING QUESTIONNAIRE (ESQ)
b. Process flow or block flow diagram showing all raw materials and auxiliaries used, water consumption per process, wastewater generation,
emission points as well as solid and hazardous waste generation.
c. Does the promoter have finalized the technology supplier for their project?
Yes
No
Yes
No
How many similar plants are currently operating in Saudi Arabia or in other parts of the world using the same technology that is being planned in
the industrial city?
g. Does the facility operation involve bulk material handling of raw materials or products which are fine powder in nature?
If yes, provide estimated quantities of such materials.
h. Does the facility operation involve trucking of solid/liquid/waste materials or raw materials or products? If yes, provide estimated number of trucks
that will be employed per day.
A-1
Annual
Consumption
(unit)
3. Other Materials/ Auxiliaries Used: Complete the following table relating to other materials used in the proposed facility.
Material
Process
Delivery Method
Storage Method
On-Site Storage
Max. Hourly
Quantity
Consumption
(unit)
Annual
Consumption
(unit)
4. Products/ By-Products: Complete the following table relating to all products or materials produced by the proposed facility.
Product/ By-Product
Max. Hourly
Annual Production
Storage/
Production
Process
(unit)
Delivery Method
(unit)
Maximum Storage
Capacity
Unit of concentration should be the same as the unit of the point emission source standards in Table 2B of RCER- 2015, Volume I.
3
If no point source emission standard exists for the particular component, the unit should be mg/m .
As defined in RCER (glossary for VOC and Table 2C of RCER- 2015, Volume I for HAP)
Treatment Required?
If yes, please specify
type of treatment
10.
(b) Complete the following table relating to effluent discharges. Include all discharges of industrial wastewater, cooling water, liquid effluents and pretreatment methods, if any.
Pre-Treatment Required?
Discharge
Pollutant Concentration
Source
If yes, please specify
Flow Rate
pH
TDS
TOC
TSS
Temp.
o
(Ave)
mg/l
mg/l
mg/l
( C)
Process
wastewater
effluent
to
IWTP
3
(m /day)
3
Return sea water cooling (m /hr)
3
Cooling tower blow down (m /day)
3
Other effluents (m / day)
3
Sanitary wastewater to SWTP (m /day)
11. Solid / Liquid Waste (Hazardous and Non Hazardous): Complete the following table relating to the production, storage and disposal of all solid,
sludge and liquid wastes.
Amount
Maximum
Generated
Storage
Composition
Treatment, Disposal Methods and
(tons/year)
(tons)
Location
Source
Control Methods
13. Flare: Complete the following table relating to flares of the facility.
Type
(Elevated, Ground, Emergency, Regulated, Other
Flares)
Number of Flares
14. Incinerator: Complete the following table relating to Incinerator of the facility.
Number of
Type of Incinerator
Incinerators
Height of Flares
(Meter)
Type of Auxiliary
Fuel Used
Waste to be Burnt
Provide hydrocarbon content and calorific value)
16. Dredging Operations: Complete the following table relating to Dredging Operation at the facility.
Does the facility construction involve any Dredging operation ? Yes/ No
[
]Yes
[
] No
[
]Yes
[
] No
if yes, material used:
[
]Yes
[
] No
if yes, material used:
[
]Yes
[
] No
if yes, provide type, number, capacity and material
stored.
Aboveground storage tanks
[
]Yes
[
] No
if yes, provide type, number, capacity and material
stored.
Painting on site
[
]Yes
[
] No
Hazardous materials storage area
[
]Yes
[
]
if yes, provide a sketch of the area
No
Additional Information: please use the space below to add any other relevant information that may facilitate the issuance of the permit.