EMARAT DEVELOPERS

Site - MUFADDAL UPLIFTMENTS,VASIND


Construction Progress Report

B3
BUILDINGWISE
Date
ITEMS

1 BUILDING's

OUTSIDE WALLS

1.1 Waterproofing
1.2 Exterior paint

2 DUCTS
3.1 Water Downline
3.2 Drainage Downline
3.3 Electrical piping for TV set top box
3.4 Painting duct walls
3.5 Roof Shade(Acryclic) above Ducts

5 TERRACE
5.1 Terrace Piping Looping - (40mm 2 Lines & 8 Ball Valves Per Terrace)
5.2 Terrace Rain Water Piping - (4 Downtake Lines Per Terrace)
5.3 Terrace water proofing + IPS
5.4 Painting parapet walls
5.5 Painting O/H Water tank
5.6 Terrace Door Jamb lining
5.7 Terrace doors' frame & Door

6 STILT/PARKING
6.1 Paver Blocks

OPERS

MENTS,VASIND
ess Report

8/16/2016
WORK STATUS

PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
PENDING
PENDING
COMPLETED
COMPLETED

PENDING

PENDING
COMPLETED
N/A

1
1.1
1.1.1
1.1.2
1.1.3
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.3
1.3.1
1.3.2
1.3.3
1.4
1.4.1
1.4.2
1.4.3
1.4.4
1.5
1.5.1
1.5.2

2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5

3.2
3.2.1
2.2
2.2.1
2.2.2
2.3
2.3.1
2.3.2
2.3.3
2.4
2.4.1
2.4.2
3.4
3.4.1
3.4.2
3.4.3

3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.2
3.2.1
3.2.2
3.3
3.3.1
3.3.2
2.3
2.3.1
2.3.2
2.3.3
2.3.4
3.4
3.4.1
3.4.2
3.4.3
3.4.4
3.5
3.5.1

4
4.1
4.1.1
4.1.2

4.1.3
4.1.4
4.2
4.2.1
4.2.2
4.3
4.3.1
4.3.2
4.4
4.4.1
4.4.2
4.4.3
4.4.4
4.5
4.5.1
4.5.2
4.5.3
4.5.4
4.5.5
4.6
4.6.1
4.6.2

5
5.1
5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.1.6
5.2
5.2.1
5.3
5.3.1
5.3.2

6
6.1
6.2
6.3
6.4
6.5

7
7.1
7.2
7.3

7.4
7.5
7.6
7.7
7.8
7.9

EMARAT DEVELOPER

Site - MUFADDAL UPLIFTMENTS


Work Progress Repor

B3 Building
FLOORWISE

ITEMS

LIVINGROOM & BEDROOM


CIVIL WORKS
Flooring Tiles - 2'x2'
Skiritng - 2' x 3"
Vitrified 2' 2' tiles on Chajja - Bedroom window Sill

DOORS
MAIN Wooden Door's Frame
MAIN Wooden Door Shutter with Melamine Polish
Door Jamb lining - Bedroom
Pvc door shutter -Bedroom
Fitting of lock & door's all accessories

WINDOWS
Window Jamb lining - Living room & Bedroom
25mm - 3 TRACK - 2 SLIDING + 1 MOSQUITEO (50% opening) - Living
18mm - 3 TRACK - 2 SLIDING + 1 MOSQUITEO (50% opening) - Bed

ELECTRICAL
Concealed Piping - Floor & Walls
Distribution Baord(DB) & Inverter board
Wiring
Switch boards

PAINTING
Ceiling
Wall

KITCHEN
CIVIL WORKS
Flooring Tiles - 2'x2'
Wall tiling - 1' 1.5'
Wall tiling - 8" 12" below platform
Kitchen Platform In Black Granite Top & Inside Verticle In White Marble
Sink - 16" 14" fitting in platform

DOOR
Door Jamb lining

WINDOW
Window Jamb lining
18Mm - 2 Track - 2 Sliding + 1 Mosquito (50% Opening)

ELECTRICAL
Concealed Piping - Floor & Walls
Wiring
Switch boards

PAINTING
Ceiling
Wall

PLUMBING
Fixing of Nahani-trap
Concealed Internal piping
Fitting of Plumbing Accessories

BATHROOM
CIVIL WORKS
Water Proofing with Chemical coating
Brickbat coba
Flooring - 1' 1'
Wall tiling - 1' 1.5'
Fixing of green marble partition for Washing machine
Fixing of Curtain rod & Curtain

DOOR
Door Jamb lining
PVC door shutter

WINDOW
Window Jamb lining
Louvers with Mosquito Net

ELECTRICAL
Concealed Piping - Walls
Wiring
Switch boards
Exhaust fan

PLUMBING
Fixing of Nahani-trap
Concealed Internal piping
Fitting of Plumbing Accessories
Fixing of Wash basin

PAINTING
Ceiling

WC
CIVIL WORKS
Water Proofing with Chemical coating
Brickbat coba

Flooring - 1' 1'


Wall tiling - 1' 1.5'

DOOR
Door Jamb lining
Pvc door shutter

WINDOW
Window Jamb lining
Louvers with Mosquito Net

ELECTRICAL
Concealed Piping Walls
Wiring
Switch boards
Exhaust fan

PLUMBING
Fixing of Commode & P-trap
Concealed Internal piping
Fitting of Plumbing Accessories
Fitting of Flush tank
Fixing of Wash basin

PAINTING
Ceiling
Wall

BALCONY
CIVIL WORKS
Water Proofing with Chemical coating
Brickbat coba
Flooring - 1' 1'
Skirting - 3"
M.S. Balcony Railing with Black paint
Railing Cill in green marble

PLUMBING
Balcony Drain line with Nahani Trap

PAINTING
Ceiling
Wall

PASSAGES
Flooring Tiles- 2' x 2'
Skirting Tiles - 2' x 3"
Jamb lining for Openings inside the passage - 4opening on one floor
Doors for accesing chambers on ground floors
Painting passage walls & Celing

STAIRCASE
Staircase Landing - 2' 2' Vitrified
Staircase Tread in Kotah
Staircase Riser in Green marble

Staircase Skirting in Green marble


Stringer Top in Green marble - 5" Wide
M. S Handrail in Black paint finish
Flooring & skirting on First Midlanding above entrance & Nahani trap
Green marble Sill on Half wall between Staricase & Shaft
Junction box & Board

EVELOPERS

PLIFTMENTS,VASIND
ress Report

uilding

RWISE

Date 8/16/2016

WORK STATUS
Gr. Floor

I Floor

II Floor

III Floor

PENDING
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

PENDING
PENDING
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
PENDING
PENDING

PENDING
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

PENDING
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING
PENDING
PENDING
PENDING

COMPLETED
IN PROGRESS
IN PROGRESS
IN PROGRESS
IN PROGRESS

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

PENDING

COMPLETED

COMPLETED

COMPLETED

PENDING
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

PENDING
PENDING
PENDING

COMPLETED
PENDING
PENDING

COMPLETED
PENDING
PENDING

COMPLETED
PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING
PENDING

COMPLETED
COMPLETED
PENDING

COMPLETED
COMPLETED
PENDING

COMPLETED
COMPLETED
PENDING

PENDING
PENDING
PENDING
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
COMPLETED
PENDING
PENDING

PENDING
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

PENDING
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

PENDING
PENDING
PENDING
PENDING

COMPLETED
PENDING
PENDING
PENDING

COMPLETED
PENDING
PENDING
PENDING

COMPLETED
PENDING
PENDING
PENDING

PENDING
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING

PENDING

PENDING

PENDING

PENDING

PENDING
PENDING

COMPLETED
COMPLETED

COMPLETED
COMPLETED

COMPLETED
COMPLETED

PENDING
PENDING

COMPLETED
COMPLETED

COMPLETED
COMPLETED

COMPLETED
COMPLETED

PENDING
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

PENDING
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

COMPLETED
PENDING

PENDING
PENDING
PENDING
PENDING

COMPLETED
PENDING
PENDING
PENDING

COMPLETED
PENDING
PENDING
PENDING

COMPLETED
PENDING
PENDING
PENDING

PENDING
PENDING
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
PENDING
PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING
PENDING
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING

PENDING
PENDING
PENDING
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED
N/A
PENDING

COMPLETED
COMPLETED
COMPLETED
N/A
PENDING

COMPLETED
COMPLETED
COMPLETED
N/A
PENDING

PENDING
PENDING
PENDING

COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

COMPLETED
COMPLETED
COMPLETED

PENDING
PENDING
PENDING
PENDING
PENDING
PENDING

PENDING
PENDING
PENDING
N/A
COMPLETED
PENDING

PENDING
PENDING
PENDING
N/A
COMPLETED
PENDING
`

PENDING
COMPLETED
N/A
IN PROGRESS

PENDING
PENDING
PENDING
N/A
COMPLETED
PENDING

Calculation of Work done of finishing by United interior

Date

9/7/2016

Total Amount payable


Dividing the amount flatwise
Building
Flats

Percentage
%

B4

32

26.6666666667

B3

28

23.3333333333

B2

28

23.3333333333

B1

32

26.6666666667

120

100

Building

Work done

Amount

Rs

B4

86

7453333

B3

60

4550000

B2

17

1289167

B1

346667

Work Executed of Appx

13639167
600167
81792

RETNETION@5% - B4 & B3 (-)


RETNETION@5% - B2 & B1 (-)

Work done of Value

12957208

PAYMENT DONE
Payment done(Labour + Material)

Material given at Site of Value


Vat /ST@11.3% cumulative
Net payment done

15800000
204546
1785400
14219146

COMPARISION

Net payment done


Work done of Value
Difference

14219146
12957208
1261938

by United interiors till Date

32500000
Net Amount payable
Rs

Amount Without Retention

8666667
7583333
7583333
8666667
32500000
Remarks

Refer Sheet
Refer Sheet
See comment
See comment

30875000

Pending Work's Value

1213333
3033333
6294167
8320000

18860833
212333
730708

17917792

Retention

1625000

Total Contract value

32500000