CASE STUDY
SOUTH AFRICA
and a narrow aperture of just 3.7m by 3m, it was perfectly suited, however, for the Rail-Veyor system.
And not only was the Rail-Veyor the most efficient and least expensive option to operate, its installation
time was only a fraction of its competitors. Conservatively estimated as a 12-month installation,
Phakisas Rail-Veyor system was up and running in only six months.
M O V I N G M AT E R I A L H A U L I N G I N A W H O L E N E W D I R E C T I O N
2016 RAIL-VEYOR TECHNOLOGIES GLOBAL, INC. ALL RIGHTS RESERVED
RailVeyor.com | 844.288.0450
CASE STUDY
SOUTH AFRICA