SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST

SAIC NUMBER

SAIC-P-3216

High Voltage Cable - Material Receiving


PROJECT TITLE

WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED INSPECTION DATE & TIME

ACTUAL INSPECTION DATE & TIME

DATE APPROVED

1-Oct-05

QR NUMBER

ELEC -

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM
No.

ACCEPTANCE CRITERIA

REFERENCE

A1

Cable reels of High Voltage Cable shall be checked for damage by store
yard personnel prior to acceptance of shipment, unloading, or handling.
No visible shipping or handling damage. (NFPA 70, NEC Art. 110.3(B),
manufacturer's instructions)

A2

Name plate data of High Voltage Cable drums shall be compared with
latest cable schedule, vendor drawings and project specifications.

A3

Traceability shall be maintained for High Voltage Cable drums as


specified in Saudi Aramco Standards.

Schedule Q
Attachment IV
Para 3.3

A4

Documentation and numbering system of High Voltage Cable drums


shall comply with the Saudi Aramco system.

Schedule Q
Attachment II
Para 2.7

A5

Material identification procedure shall be implemented for all incoming


High Voltage Cable drums.

Schedule Q
Attachment IV
Para 3.2

A6

Power cables rated 69 KV and above, with solid dielectric insulation,


shall comply with either AEIC CS6 (69 KV EPR insulated cable) or AEIC
CS7 (69 KV and above XLPE insulated cable).

SAES-P-104
Para 5.2.4

A7

Insulation thickness shall be in accordance with the tables in these


standards (e.g., 16.5 mm (650 mils) for 69 Kv rated cables and 20.3 mm
(800 mils) for 115 KV rated cables), not reduced thickness based on
maximum stress design.

SAES-P-104
Para 5.2.4

A8

Check that Vendor Installation Manual for High Voltage Cable handling is
provided along with the shipment. NEC 110.3B

SAES-P-100
Sec 5.2

A9

Cables shall be marked to indicate the following information and shall be


repeated at intervals not exceeding 1.0 m (40 in.).
1 Rated Voltage
2 Type of cable
3 Manufacturer's name, Trademark
4 The AWG size or circular mil area
5 cable assemblies
NEC 310-11

SAES-P-100
Sec 5.2

A10

Check that the end capped (seal) of cable are heat-shrinkable.

A11

Check that the cable meet with Specifications for Crosslinked


Polyethylene Insulated Shielded Power Cables Rated 69 through 138 KV.

Page 1 of 2

SAES-P-100
Sec 5.2
Sceco Material
Standard 11SMSS-5, Rev. 3

SA PreCommissioning
Form P-005 &
006
SAES-P-100
Sec 5.2

WORK PERMIT REQUIRED?

PASS

FAIL

N/A

RE-INSP DATE

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)


SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST

DATE APPROVED

SAIC-P-3216

High Voltage Cable - Material Receiving

WBS / BI / JO NUMBER

PROJECT TITLE

ITEM
No.

ACCEPTANCE CRITERIA

REFERENCE

QR NUMBER

1-Oct-05

ELEC -

CONTRACTOR / SUBCONTRACTOR

PASS

FAIL

N/A

RE-INSP DATE

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-P-100 Basic Power System Design Criteria (9/29/2004)
2- Schedule "Q" (November 2003)
3- 11-SAMSS-5 Specification For Power Cable, XLPE Insulated, Copper Conductor, Single Core, 115 KV or 230 KV Rating (Sceco 07/1999)
4- NFPA 70 National Electrical Code (NEC), 2002 Edition
5- SA Pre- Commissioning Form P-005, 006 (10/1997)
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer
indicates compliance with appropriate standards or performance in a specified manner.

Contractor / Third-Party

Saudi Aramco

Construction Representative*

PMT Representative

Work is Complete and Ready for Inspection:


Name, Initials and Date:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

Name, Initials and Date:

PID Representative

QC Inspector
Performed Inspection

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

Proponent and Others

QC Supervisor
Quality Record Approved:
Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Completion of Quality Work / Test

Y = YES

Page 2 of 2

N = NO F = FAILED