SOLENOID VALVE
DIRECTION OF FLOW
DIRECTION OF SLOPE
PIPE SLEEVE
REDUCER
AAV
r.
STRAINER W/ BLOWDOWN
DV
HB
WH
F&T/IB
DRAIN VALVE
HOSE BIBB
WALL HYDRANT
GROUND HYDRANT
STEAM TRAP
PRESSURE GAUGE
FLANGED CONNECTION
CAP
PLUG OR BLIND FLANGE
RISER
ELBOW UP
ELBOW DOWN
TEE UP
TEE DOWN
HORIZONTAL TEE
FLEXIBLE CONNECTION
BALL JOINT
FLOW SWITCH
T
S (SIZE)
V
WFM
RPBA
DCVA
DCDA
MECHANICAL COUPLING
BWV
UG
PIV
PLUMBING PIPING
TEMPERATURE TRANSMITTER
SHOCK ARRESTOR
VACUUM BREAKER
WATER FLOW METER
REDUCED PRESSURE BACKFLOW ASSEMBLY
DOUBLE CHECK VALVE ASSEMBLY
DOUBLE CHECK DETECTOR ASSEMBLY
BACKWATER VALVE
UNDERGROUND GATE VALVE W/BOX
UNDERGROUND GATE W/POST INDICATOR
OUTSIDE SCREW & YOKE
Y PATTERN BOILER BLOWDOWN VALVE
NON-RETURN STOP VALVE
QUICK OPENING BOILER BLOWDOWN VALVE
RELOCATE EXISTING
CONNECT TO EXISTING
REMOVE EXISTING
EXISTING TO REMAIN
NOTE
CJB
CHECKED:
TJL
ACCESS PANEL
DRAWN:
SYMBOLS
HTW
RHTW
RTW
WW
ICW
G
MG
GV
12-31-15
EXPIRES
STRAINER
PIPING CONNECTIONS
WASTE
(ABOVE GRADE OR FLOOR)
WASTE
(BELOW GRADE OR FLOOR)
PUMPED WASTE
(ABOVE GRADE OR FLOOR)
(BELOW GRADE OR FLOOR)
PUMPED WASTE
GREASE WASTE
(ABOVE GRADE OR FLOOR)
GREASE WASTE
(BELOW GRADE OR FLOOR)
STORM DRAIN (ABOVE GRADE OR FLOOR)
STORM DRAIN (BELOW GRADE OR FLOOR)
OVERFLOW DRAIN (ABOVE GRADE OR FLOOR)
OVERFLOW DRAIN (BELOW GRADE OR FLOOR)
DRAIN (CONDENSATE/INDIRECT)
VENT
COLD WATER
HOT WATER
RECIRCULATING HOT WATER
140 HOT WATER
140 RECIRCULATING HOT WATER
RECIRCULATING TEMPERED WATER
WELL WATER
INDUSTRIAL COLD WATER
NATURAL GAS (LOW PRESSURE)
NATURAL GAS (MEDIUM PRESSURE)
GAS VENT
9
ch
1 9 19
LA
IN
S P. C O L L
RELIEF VALVE
G GH
W
W
PW
PW
GW
GW
SD
SD
OD
OD
D
V
CW
HW
RHW
HTW
RHTW
RTW
WW
ICW
G
MG
GV
OREGON
ar
ELBOW (90)
ELBOW (45)
TEE
CROSS
W
W
PW
PW
GW
GW
SD
SD
OD
OD
D
18329PE
MAV
ANCHOR
MC
G I NEE
6
S,
J
BALANCING VALVE
FLOW CONTROL VALVE
FC
09/23/2014
PROPANE GAS
TRENCH DRAIN
TD
D PROFESS
TERE
ISSUE DATE:
PROP
PROP
REVISIONS:
NON-POTABLE WATER
1336
NPW
CO
WCO
FCO
CTG
FD
AD
CB
FS
RD
OD
SPECIALTY PIPING
NPW
THRUST BLOCK
CLEANOUT
WALL CLEANOUT
FLOOR CLEANOUT
CLEANOUT TO GRADE
FLOOR DRAIN
AREA DRAIN
CATCH BASIN
FLOOR SINK
ROOF DRAIN
OVERFLOW DRAIN
TB
PROJECT #:
INVERT ELEVATION
INCH(ES)
INSULATION
ISOLAT(OR)(ION)
KILOWATT
KILOWATT HOUR
LENGTH
LEAVING AIR TEMP
POUND
LEAVING DRY BULB
LINEAR FEET
LEAVING FLUID TEMPERATURE
LEAVING
LEAVING WET BULB
LEAVING WATER TEMPERATURE
MAXIMUM
THOUSAND BTU PER HOUR
MECHANICAL
MANUFACTURER
MINIMUM
MISCELLANEOUS
MOUNTED
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
OUTSIDE AIR DAMPER
ON CENTER DISTANCE
OUTSIDE AIR
PHASE
POLYPROPYLENE
POUNDS PER SQUARE INCH
POLYVINYL CHLORIDE
PVC COATED STEEL
RADIUS
RETURN AIR
RETURN AIR DAMPER
REVISION
RELATIVE HUMIDITY
REVOLUTIONS PER MINUTE
SUPPLY AIR
STANDARD CUBIC FEET PER MINUTE
SMOKE DAMPER
SECTION
SENSIBLE
SIMILAR
STATIC PRESSURE
SPECIFICATION
SQUARE
SQUARE FOOT(FEET)
SQUARE INCH(ES)
STAINLESS STEEL
STEEL
STRUCTUR(E)(AL)
SINGLE WALL PLENUM
SINGLE WIDTH SINGLE INLET
TEMPERATURE
TOTAL STATIC PRESSURE
TYPICAL
VOLTS
VOLUME DAMPER
VELOCITY
VERTICAL
VARIABLE FREQUENCY DRIVE
VENT THROUGH ROOF
WIDTH
WATER GAUGE
WATER PRESSURE DROP
WATER TEMPERATURE DROP
WATER TEMPERATURE RISE
WITH
WITHOUT
IE
IN
INSUL
ISOL
KW
KWH
L
LAT
LB
LDB
LF
LFT
LVG
LWB
LWT
MAX
MBH
MECH
MFR
MIN
MISC
MTD
NC
NIC
NO
OAD
OC
OSA
PH
PP
PSI
PVC
PVS
R (RAD)
RA
RAD
REV
RH
RPM
SA
SCFM
SD
SECT
SENS
SIM
SP
SPEC
SQ
SF
SQ IN
SS
STL
STRUCT
SWP
SWSI
TEMP
TSP
TYP
V
VD
VEL
VERT
VFD
VTR
W
WG
WPD
WTD
WTR
W/
W/O
L
IONA
AIRFOIL
ABOVE FINISHED FLOOR
APPARATUS HOUSING PLENUM
ALTERNATIVE
ALUMINUM
AIR PRESSURE DROP
APPROXIMATELY
ARCHITECT(URAL)
AUTOMATIC
BACKDRAFT DAMPER
BACKWARD INCLINED
BUILDING
BASEMENT
BRITISH THERMAL UNIT
BRITISH THERMAL UNITS PER HOUR
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
CUBIC FEET PER SECOND
CEILING OR COOLING
CONCRETE
CONNECT(ION)
CONTINUE(ED)(UATION)
CENTERLINE
DIRECT DIGITAL CONTROL
DEFLECTION
DOWN
DEW POINT
DOUBLE WIDTH DOUBLE INLET
DRAWING
EXHAUST AIR
EXHAUST AIR DAMPER
ENTERING AIR TEMPERATURE
ENTERING DRY BULB
EFFICIENCY
ENTERING FLUID TEMPERATURE
ELECTRIC(AL)
ELEVATION
ENGINEER
EQUAL
EQUIPMENT
EXTERNAL STATIC PRESSURE
ENTERING WET BULB
ENTERING WATER TEMPERATURE
EXTRACTOR
EXHAUST
EXISTING
EXPANSION
DEGREES FAHRENHEIT
FORWARD CURVED
FIGURE
FILTER
FLEXIBLE
FLUID PRESSURE DROP
FEET PER MINUTE
FEET PER SECOND
FEET/FOOT
FINNED TUBE RADIATOR
FIXTURE UNIT
FUTURE
FACE VELOCITY
GAGE/GAUGE
GALLON
GALVANIZED
GLYCOL
GALLONS PER HOUR
GALLONS PER MINUTE
HEIGHT
HORIZONTAL
HORSEPOWER
HEATING
INSIDE(DIAMETER/DIMENSION)
GENERAL NOTE
M
O
H
NIC
AF
AFF
AHP
ALT
AL
APD
APPROX
ARCH
AUTO
BDD
BI
BLDG
BSMT
BTU
BTUH
CFH
CFM
CFS
CLG
CONC
CONN
CONT
CL
DDC
DEFL
DN
DP
DWDI
DWG
EA
EAD
EAT
EDB
EFF
EFT
ELEC
ELEV
ENGR
EQ
EQUIP
ESP
EWB
EWT
EX
EXH
EXIST
EXP
F
FC
FIG
FILT
FLEX
FPD
FPM
FPS
FT
FTR
FU
FUT
FV
GA
GAL
GALV
GLY
GPH
GPM
H
HORIZ
HP
HTG
ID
PLUMBING SYMBOLS
REGIS
P001
L-1
LAVATORY
1-1/2
1/2
1/2
1-1/2
S-1
SINK
S-2
SINK
S-3
SINK
1/2
1/2
1-1/2
1/2
1/2
1-1/2
1/2
1/2
1/2
1-1/2
1/2
DF-1
DRINKING FOUNTAIN
1-1/2
1/2
SH-1
SHOWER
1-1/2
3/4
3/4
FIBERGLASS ENCLOSURE,
PRESSURE BALANCE MIXING VALVE,
1.5GPM SHOWER HEAD
MS-1
MOP SINK
3/4
3/4
WH-1
WALL HYDRANT
3/4
SB-1
SUPPLY BOX
1-1/2
1/2
1/2
SB-2
SUPPLY BOX
1/2
WSCB-1
3/4
3/4
DESCRIPTION
19
ICE MACHINE
20
22
31
33
30
32
44
46
48
47
HAND SINK
SINK FAUCET
CONVECTION STEAMER
DOUBLE STACK COMBI-OVEN STEAMER
KETTLE PANTRY FAUCET
COOK TOP
SINK FAUCETS
WAREWASHER
WASTE COLLECTOR
HOSE REEL
1/2
3/4
(2)3/4
1/2
1/2
3/4
1/2
1/2
1/2
1/2
3/4
3/4
1/2
1/2
(2)3/4
3/4
-
NOTES
2
MMV-101
(DOMESTIC
SYSTEM)
1/12 HP
120 V, 1 PH
120 V, 1 PH
RPBA-2
HVAC
MAKE UP)
RPBA-3
(RWS
SYSTEM)
3
1
1
RWTS-101
RAINWATER PUMP/FILTER SKID SYSTEM:
(RAINWATER PREPACKAGED SKID BASED ON FLOW THERM MODEL FTSS-RW-UV
SYSTEM SKID) VIBRATION ISOLATION: TYPE 5, 2"MIN. DEFLECTION.
ELECTRICAL CONNECTIONS AND CONTROLS BY OTHERS.
XX GPM, XX FT HEAD
1
RWTS-101
(RAINWATER
SYSTEM SKID)
RWTS-101
10 HP
480 V,- 3 PH
1/2 HP
120 V, 1 PH
9/12/2014 4:22:28 PM
12-31-15
PRINTED ON:
18329PE
EXPIRES
G I NEE
9
ch
1 9 19
LA
IN
S P. C O L L
RHTWP-101
(KITCHEN
SYSTEM)
DCVA-1
(BUILDING
SUPPLY)
OREGON
1/6 HP
120 V, 1 PH
TP-1
THRU
TP-11
D PROFESS
TERE
ar
SP-1
3
RHWP-101
(DOMESTIC
SYSTEM)
NOTES:
1
DET-101
(DOMESTIC
SYSTEM)
L
IONA
WASH STATION
TEMPERATURE SELECTION/METERING
WALL HUNG, 20"x19", ADA
120 V, 1 PH
M
O
H
NIC
WS-1
r.
6
S,
J
CJB
CHECKED:
URINAL
GWH-102
GAS WATER HEATER
(REDUNDANT) 285 CFH INPUT, 120 GALLON STORAGE
332 GPH RECOVERY @ 100F RISE
BASED ON: LOCHINVAR SHIELD
U-1
120 V, 1 PH
TJL
GWH-101
(DOMESTIC
SYSTEM)
DRAWN:
1-1/4
09/23/2014
ELECTRICAL
ISSUE DATE:
1-1/4
DESCRIPTION
WATER CLOSET
ITEM
WC-2
NOTES
HW
REVISIONS:
WATER CLOSET
1336
WC-1
DESCRIPTION
PROJECT #:
ITEM
REGIS
P002
6.2 6.3
6.8
EXTERIOR WALL
DOWNSPOUT
3" SD UP
CONNECT
REGIS
G I NEE
18329PE
ADJUSTABLE CLEANOUT
L
IONA
HUB PIPE
2" W UP
(2 DFU)
D PROFESS
TERE
E
OREGON
r.
M
O
H
NIC
2
P101
3" SD UP
TO DSB
3" SD UP
TO DSB
9
ch
1 9 19
LA
IN
S P. C O L L
NO-HUB
COUPLING (TYP.)
P101
6
S,
J
ar
12-31-15
EXPIRES
NO-HUB COMBY
3" W
CONNECTION RAIN WATER
HARVESTING SYSTEM
3" W UP
TO FCO
3" SD
Downspout Connection
None
3" W
2" W UP
(1 DFU)
3" W
TRAFFIC RATED
HOUSING LID
4" SD
GRADE
EXTENSION
ASSEMBLY
2
P101
4" SD
3" SD UP
TO DSB
FROM STORM
DRAIN
TO RAIN WATER
CISTERN
2
P101
B.5
6" SD
3" UP
TO FD
TO CISTERN
SEE C021
3" UP
TO FS
8" SD
2
P101
3" SD
None
4" W UP
(28 DFU)
3" W
2" W UP
(6 DFU)
2" W UP
(6 DFU)
4" W
(40 DFU)
2
P101
D
UP TO
FCO
4" W
2" W UP
4" W
(49 DFU)
4" W
(46 DFU)
4" W
D.9
4" SD
3" SD UP
TO DSB
2" GW UP
PRINTED ON:
4" GW UP
TO FS
4" GW UP
TO FS
4" GW
4" GW
P101
G.1
3" SD UP
TO DSB
3" GW
UP TO FD
4" GW
UP TO FS
3" GW
4" GW UP
2" W
2" W
(6 DFU)
3" GW
UP TO FD
4" GW UP
TO FS
2" GW UP
3" GW UP
4" GW UP
TO FS
4" GW
3" GW
2" W UP
(2 DFU)
2" V UP
3" GW UP
UP TO
FCO
3/4" RHW
3/4" HW
2" V
1 1/2" V
3/4" CW
F.2
2" W
G
2" W UP
TO DF
(1 DFU)
2" W UP
TO WS
(3 DFU)
H.2
3
P501
3
P501
1 / P105
CJB
3" GW
UP TO FD
3" GW
UP TO FD
FCO
4" GW UP
TO FS
CHECKED:
4" GW
2" V UP
NORTH
9/12/2014 4:22:30 PM
4" GW
4" GW UP
TO FS
P101
REVISIONS:
4" GW TO GREASE
INTERCEPTOR
SEE C031
I.E. 393.08
(77 DFU)
3" GW UP
3" GW
TJL
3" SD UP
TO DSB
GENERAL NOTES:
P101
DRAWN:
B.8
3" W UP
TO FD
3" W UP
TO FD
4" SD
3" SD UP
3" UP
TO FS
B.7
SEE C031
FOR CONTINUATION
Vortex Separator
P101
3" SD UP
3" UP TO
WCO
FROM
RAINWATER
CISTERN
TO STORMWATER
OUTLET
09/23/2014
3" SD UP
TO DSB
ISSUE DATE:
4" CW
1336
FROM CITY
SEE C031
(200 GPM)
PROJECT #:
B.3
1 / P103
VORTEX
SEPARATOR
INLET
I.E. 390.0
TO STORM
DRAIN SYSTEM
SEE C021
P101
C 6" W TO CIVIL
I.E.388.25
(347 DFUs)
2" W UP
(2 DFU)
2" W UP
(2 DFU)
2
P101
G I NEE
18329PE
OREGON
M
O
H
NIC
r.
4" W
D PROFESS
TERE
4" W
(49 DFU)
3" SD UP
(3,800 SQ FT)
4" W UP
(40 DFU)
3" W
4" W
(53 DFU)
3" W UP
TO FD
2" W
3" W UP
TO FD
D.9
6" W
(327 DFU)
9
ch
1 9 19
LA
IN
S P. C O L L
3" W
(10 DFU)
E
2" W
2" W UP
(2 DFU)
2" W UP
(6 DFU)
2" W UP
(6 DFU)
4" SD
4" SD UP
TO CTG
2" W
6" W
(218 DFU)
3" W
2" W
2" W
2
P501
E.7
3" W UP
(6 DFU)
2" W UP
TO FCO
4" W
SP-101
4" W UP
(4 DFU)
3" W
2" W
2" W UP
(2 DFU)
12-31-15
EXPIRES
2" W
3" SD
4" SD
2" W UP
(8 DFU)
2" W UP
(4 DFU)
6
S,
J
ar
4" W UP
(8 DFU)
2" W UP
(2 DFU)
3" SD UP
TO DSB
L
IONA
2" W UP
(2 DFU)
2" W UP
(2 DFU)
GENERAL NOTES:
REGIS
1 / P101
B.8
4" W UP
(4 DFU)
B.7
4" W UP
(12 DFU)
2" PW
F.2
2" W UP
(4 DFU)
2" W UP
(4 DFU)
4" W
4" W
G.1
3" SD UP
TO DSB
3
P501
2
P101
H
3
P501
1 / P101
1 / P105
4" W
(196 DFU)
J
2" W
2" W
L
4" SD
3" SD UP
TO DSB
2
P101
M
3" W UP
(3 DFU)
3" W
UP TO
FCO
2" W UP
(4 DFU)
4" W UP
(16 DFU)
3" SD
2" W UP
(4 DFU)
(191 DFU)
4" W
(194 DFU)
2" W UP
(2 DFU)
3" SD
4" W
4" W
PRINTED ON:
2" W
2" W UP
(4 DFU)
3" SD
UP
2" W
2" W
2" SD UP
4" SD
2" W UP
(6 DFU)
2" W
(52 DFU)
2" W UP
(6 DFU)
2" W
3" W
(20 DFU)
3" W
2" W
2" W
UP TO
FCO
3" SD
2" W UP
(6 DFU)
3" W UP
TO FD
4" W UP
(40 DFU)
4" SD UP
TO CTG
P.7
Q
2" W
3" W UP
TO FD
2" W UP
(8 DFU)
2" W UP
(4 DFU)
12
12.6
13
13.6
14
14.4
15
CJB
11.9
CHECKED:
11
TJL
10
DRAWN:
09/23/2014
ISSUE DATE:
REVISIONS:
1336
P101
1 / P105
PROJECT #:
3" SD UP
TO DSB
NORTH
9/12/2014 4:22:34 PM
4" W
4" W
(99 DFU)
P103
G I NEE
18329PE
REGIS
L
IONA
D PROFESS
TERE
OREGON
r.
M
O
H
NIC
6
S,
J
ar
9
ch
1 9 19
LA
IN
S P. C O L L
12-31-15
EXPIRES
K
4" SD
L
2
P101
3" SD UP
TO DSB
UP TO
FCO
2" W
2" W
3" W
(20 DFU)
3" W
UP TO
FCO
(52 DFU)
2" W
2" W UP
(6 DFU)
2" W
P.7
2" W UP
(6 DFU)
3" W UP
TO FD
Q
2" W
2" W UP
(8DFU)
Q
3" W UP
TO FD
2" W UP
(4 DFU)
4" W UP
(40 DFU)
R
4" W UP
TO CTG
P101
3" SD UP
TO DSB
1 / P103
0.9
4.3
5.4
6.1
PRINTED ON:
1336
09/23/2014
PROJECT #:
ISSUE DATE:
REVISIONS:
1/8" = 1'-0"
9/12/2014 4:22:36 PM
1.9
NORTH
(27 DFU)
CJB
2" W
CHECKED:
2" W
4" W
(99 DFU)
3" SD
UP
TJL
2" W UP
(4 DFU)
DRAWN:
2" W UP
(4 DFU)
4" W UP
(19 DFU)
2" W UP
(4 DFU)
2" W UP
(4 DFU)
P105
GENERAL NOTES:
2
6.2
6.8
3" DSN-1
NOTES:
3" DSB-1
REGIS
A113
1/2" RHW UP
1/2" HW UP
1/2" CW UP
1-1/2" V UP
18329PE
OREGON
r.
6
S,
J
ar
9
ch
1 9 19
LA
IN
S P. C O L L
RAMP
G I NEE
S-1
M
O
H
NIC
1/2" RHW
1/2" HW
1 1/2" V
1/2" CW
D PROFESS
TERE
L
IONA
A121
12-31-15
EXPIRES
CUSTODIAL
FCO
A116
BLDG STORAGE
DF-1
A117
1/2" CW DN
1-1/2" V UP
WF
3" DSB-1
A120
PE OFC/STG
D.9
A114
GYM
A111
EMERGENCY GAS
SHUT OFF SWITCH.
3" DSB-1
TBL STORAGE
A105
1/2" CW DN
1/2" HW DN
2" W DN
1-1/2" V UP
ELEC
A118
2" GV UP
TO VTR
1" GV UP
TO VTR
B.3
4" FS-1
3" FD-3
B.5
KITCHEN
A104
2" CW
2" HTW
3/4" RHTW
BOILER
A119
WC-1
L-1BOYS U-1
(TYP)A109
U-1
2 A
PIPING UP TO AND INCLUDING
GAS METER BY NORTHWEST
NATURAL.
3/4" RHW
GIRLS
L-1
(TYP)
3/4" CW
3/4" HW
2" NPW DN
2" NPW
A106
1 1/2"
L-2
NPW
CUST
A112
2" NPW UP
2" CW UP
2" HW UP
2" RHW UP
FAMILY TOILET
A107
A
WC-2
19
A104D
4" FS-1
3/4" RHTW
2" HTW
2" CW
30
4" FS-1
1/2" HTW
1/2" CW
2" V
2" GV UP
TO VTR
FCO
3" FD-3
1/2" HTW
46
48
47
3" FD-3
LOBBY
A101
3" FD-1
WSCB-1
32
1/2" HTW
1/2" CW
20
3/4" CW DN
3/4" HTW DN
1/2" RHW DN
KITCHEN
2" NPW
1/2" CW DN
1/2" HTW DN
31
3/4" RHTW
PE CIRCULATION
22
VESTIBULE
A100
2" CW
2" HTW
3/4" RHTW
4" FS-1
MS-1
A110
TP-01
3" FD-3
1/2" RHW
3/4" HW
3/4" CW
3" FD-4
B.8
2 1/2" NPW
WC-1
(TYP) 4
3/4" CW
1/4" HTW
CUST
1/2" RHTW
A104C
EMERGENCY GAS
SHUT OFF SWITCH.
G.1
MS-1
HALL
3/4" RHTW
A106B
3/4" CW DN
3/4"STORAGE
HW DN
TBL
1/2"A105
RHW DN
3" DSB-1
CAFETERIA
A103
COMMUNITY ROOM
ENTRY
A102
2
P111
A
KITCHEN
EXIT
A104
CUST
1/2" CW DN
1/2" HW DN
1/2" RHW DN
1/2" CW
2" V 3/4" CW
S-2
3/4" CW
EXIT
A104C
D.9
3" V UP
3/4" HW
3/4" RHW
F.2
ENTRY
KITCHEN
CAFETERIA
A103
CW,HW
RHW
DN
A104D
3" DSB-1
G.1
33
TRAY
RETURN
3
P501
3
P501
DF-1
WS-1
TJL
CJB
DRAWN:
CHECKED:
09/23/2014
ISSUE DATE:
1 / P115
1336
REVISIONS:
H.2
PROJECT #:
GPRV-105
WC-1
1 A
2" G
1 / P113
B.7
NORTH
9/12/2014 4:22:40 PM
4" FS-1
FCO
1
P411
GV
20
PRINTED ON:
4" FS-1
3" FD-3
P111
7.8
8.2
10
11
12
13
13.6
14
15
GENERAL NOTES:
A. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR
TO CORDINATE THE WORK WITH THAT OF ALL OTHER
TRADES, INCLUDING BUT NOT LIMITED TO: ELECTRICAL,
SPRINKLER, HVAC, STRUCTURAL AND GENERAL
ARCHITECTURE.
3" DSN-1
PRINCIPAL
B101
B102
2" V
1/2" CW DN
1/2" HW DN
1-1/2" V DN
STAFF ROOM
B103
SH-1
3" DSN-1
S-3
WC-2B104 L-2
B105
3" OD
UP
3" SD UP
B125D
9
ch
1 9 19
LA
IN
S P. C O L L
LIFE SKILLS
3/4" CW
SB-2
TP-05
ar
CHANGING
SB-2
QUIET
B125
S-2
B100
3/4" RHW
2" HW
2" CW
2" NPW
WC-2
4" W DN
4
TOILET
LACTATION RM
B112
B111
CLASSROOM
WORKROOM
B113
3" OD
WC-1
WC-1
B123
(TYP)
1/2" CWDN
1/2" HW DN
1/2" RHW DN
3" OD UP
HEALTH
U-1
2"E
NPW WS-1
DN
3" V UP
WS-1
B106
2" NPW
S-2
CLOSET
1/2" RHW
1/2" HW
1/2" CW
MOTOR SKILLS
B109
3/4" CW
3/4" HW
3/4" RHW
1 1/2" NPW
3/4" CW
OFFICE
3/4"
HW
B107
3/4" RHW
VOLUNTEER
B117
S-1
3/4" CW
U-1
CONFERENCE
B110
3/4" RHW
3/4" HW
3/4" CW
3/4" CW
SENSORY ROOM
B121
FCO
B115
WC-2
B130
2" W UP/DN
1-1/2" V UP
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
L-2
L-2
ELEVATOR
SMALL GROUP
HEALTH TOILET
B118
B108
WC-2
B116
2" W UP/DN
1-1/2" V UP
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
CLASSROOM
B131
3/4" CW
B128
E.7
S-1
S-1
B120
NOTES:
B128A
HALLWAY
3/4" CW
3/4" CW
3/4" HW
3/4" RHW
F.2
4" W DN
2" VMDF
UP
STAIR
3/4" CW
1" HW
1" CW
COMMONS
3/4" CW
3/4" HW
3/4" RHW
SOR
3/4" RHW
3/4" RHW
3/4" HW
3/4" CW
B124
3" SD
UP/DN
S-1
WH-1
3/4" RHW
1 1/4" HW
1HALLWAY
1/4" CW
1 1/4" NPW
B127
3/4" CW DN
3" OD UP
B119
B114
S-1
CLASSROOM
1/2" CWDN
1/2" HW DN
1/2" RHW DN
2" NPW
3/4" RHW
3/4" HW
HALLWAY
2" W UP/DN
1-1/2" V UP
3/4" CW UP/DN
3/4" HW UP/DN
1/2" RHW UP/DN
B126
2" W UP/DN
1-1/2" V UP
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
GIRLS
B122
4" W UP/DN
3
5
A
BOYS
12-31-15
EXPIRES
D
RECEPTION
OREGON
M
O
H
NIC
TOILET
G I NEE
18329PE
3" DSB-1
SB-1
2" NPW
2" CW
2" HW
3/4" RHW
D PROFESS
TERE
L
IONA
WH-1
r.
SECRETARY
WC-1
1 TOILET
1/4" NPW
CHANGING
L-1 B125C
6
S,
J
2" V DN
4" W DN
B.8
REGIS
1 / P111
6.8
WH-1
STAIR
CLASSROOM
B132A
B129
WH-1
3/4" CW DN
3" DSB-1
1 / P111
1 / P115
L
3" DSB-1
WH-1
1 1/2" CW
1 1/2" HW
3/4" RHW
2" NPW
B132B
CLASSROOM
3/4" CW DN
FCO
CLASSROOM
B144
B146
3/4" CW DN
CUST
3" FD-1
WH-1
MS-1
B138
HALLWAY
PRINTED ON:
WC-2
SMALL GROUP
WC-2
WC-2
B135
S-1
1-1/2" V UP
2" W UP/DN
1-1/2" V UP
2" W UP/DN
S-1
B134
3" SD UP/DN
B139 L-2
B136
3/4" RHW
3/4" HW
3/4" CW
STAFF 3"
TOILET
SD UP/DN
1/2" CW DN
1/2" HW DN
1/2" RHW DN
B140
HALLWAY
B137
HALLWAY
3/4" RHW
3/4" HW
3/4" CW
COMMONS
B145
B143
FCO
HALLWAY
B147
STAIR
B151
WS-1
3" DSN-1
3/4" CW DN
U-1
U-1
3" FD-1
WC-1 BOYS
C105
WC-1
WC-1
U-1 A
U-1
2
3" FD-1
GIRLS
BOYS
B142
B141
WC-1
A 3
WC-1
S-1
3" DSN-1
WH-1
CTG
2" W UP/DN
1-1/2" V UP
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
2" W UP/DN
1-1/2" V UP
3/4" CW UP/DN
3/4" HW UP/DN
1/2" RHW UP/DN
CLASSROOM
MULTIPURPOSE
B150
B149
1" CW
1" HW
3/4" RHW
S-1
WH-1
S-1
CLASSROOM
B148
3" DSB-1
1 / P115
3" FD-1
3/4" CW
3/4" RHW
3/4" HW
3/4" CW
09/23/2014
WS-1
P.7
ISSUE DATE:
WS-1
REVISIONS:
2" W UP/DN
1-1/2" V UP
1/2" CW DN
1/2" HW DN
1/2" RHW DN
3/4" RHW
3/4" HW
3/4" CW
L-2
3/4" CW
3/4" CW
3/4" HW
3/4" RHW
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
1336
OFFICE
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
SOR
PROJECT #:
11.9
NORTH
9/12/2014 4:22:47 PM
B137
STORY COVE
STAIR
CJB
B132
CHECKED:
B133
TJL
MEDIA CENTER
DRAWN:
MEDIA WORK RM
3/4" CW
2" V
3/4" HW
3/4" RHW
S-2
P113
GENERAL NOTES:
REGIS
G I NEE
18329PE
L
IONA
NOTES:
D PROFESS
TERE
OREGON
r.
M
O
H
NIC
6
S,
J
ar
9
ch
1 9 19
LA
IN
S P. C O L L
12-31-15
EXPIRES
1
3
L
3" DSB-1
3" SD UP/DN
(2,650 SQ FT.)
CLASSROOM
C107
CLASSROOM
2" V
4" W
UP/DN
WC-2
3/4" RHW
3/4" HW
3/4" CW
FCO
HALLWAY
COMMONS
HALLWAY
C110
C108
C106
1" CW
1" HW
1" RHW
CLASSROOM
C111
S-1
1-1/2" V UP
2" W UP/DN
3/4" W UP/DN
1-1/2" V UP
3/4" CW DN
3/4" HW DN
1/2" RHW DN
C103
HALLWAY
S-1
C100
3/4" CW
3/4" HW
3/4" RHW
2" NPW
3" OD UP
P.7
2" W UP/DN
1-1/2" V UP
1/2" CW DN
1/2" HW DN
1/2" RHW DN
Q
S-1
1 1/2" NPW
STAFF TOILET
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
WS-1
WC-1
U-1
U-1
3"GIRLS
OD
WC-1
C104
BOYS
C105
WC-1
R
CLASSROOM
MULTIPURPOSE
C113
C112
3" DSN-1
WH-2
CTG
0.9
4.3
5.4
6.1
PRINTED ON:
1336
09/23/2014
PROJECT #:
ISSUE DATE:
REVISIONS:
1/8" = 1'-0"
9/12/2014 4:22:50 PM
1.9
NORTH
1 / P113
3" SD UP/DN
(2,600 SQ FT.)
3" DSB-1
FCO
L-2
CJB
C114
3/4" RHW
3/4" HW
3/4" CW
L-2
CHECKED:
3/4" CW
3/4" HW
3/4" RHW
STAIR
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
B134
C102
WC-2
1/2" CW UP/DN
1/2" HW UP/DN
1/2" RHW UP/DN
SMALL GROUP
SOR
S-1
TJL
S-1
1-1/2" V UP
2" W UP/DN
3" V UP
DRAWN:
1-1/2" V UP
2" W UP/DN
IDF
3" W UP
C101
TO MS
C109
P115
GENERAL NOTES:
G I NEE
18329PE
1/2" CW DN
1/2" HW DN
1/2" RHW DN
D PROFESS
TERE
L
IONA
REGIS
OREGON
r.
M
O
H
NIC
6
S,
J
ar
9
ch
1 9 19
LA
IN
S P. C O L L
1/2" CW
1 1/2" V
1/2" HW
1/2" RHW
12-31-15
EXPIRES
4
1/2" CW DN
1-1/2" V DN
3/4" RHW DN
2" HW DN
2" CW DN
2" NPW DN
2" V
2" V UP TO VTR
1/2" RHW
1/2" HW
3/4" CW
1" CW DN
1/2" HW DN
1/2" RHW DN
B.3
B.7
D.9
NORTH
CJB
DRAWN:
CHECKED:
09/23/2014
ISSUE DATE:
REVISIONS:
1336
PROJECT #:
1/8" = 1'-0"
P121
GENERAL NOTES:
REGIS
G I NEE
18329PE
OREGON
r.
M
O
H
NIC
TP-06
GIRLS
B222
B223
WC-1
WC-1
U-1
3 A
3" FD-1
WC-1
3" FD-1
WC-1
U-1
WS-1
3" OD
HALLWAY
3/4" CW
DF-1
CLASSROOM
B225
B226
B227
S-1
S-1
12-31-15
EXPIRES
2" V
2" V
3" OD UP
3" SD
9
ch
1 9 19
LA
IN
S P. C O L L
S-1
3" V UP
3" OD
B219
3" OD UP
3" SD UP
MULTIPURPOSE
2" V
2" NPW
WS-1
2" V
CLASSROOM
6
S,
J
ar
2BOYSA
D PROFESS
TERE
L
IONA
NOTES:
3" SD UP/DN
(2,600 SQ FT)
STAFF TOILET
3" SD UP
HALLWAY
B224
3" V
STAIR
HALLWAY
COMMONS
B128A
B228
B230
B221
HALLWAY
HALLWAY
B232
B217
L-1
3" V UP
TO VTR
3" V
L-1
3/4" CW DN
1-1/2" V UP
SOR
2" V
3" V
2" V
B220
WC-1
1 S-1
WC-1
S-1 1
SMALL GROUP
B216
2" NPW DN
WORKROOM
3" V UP TO VTR
B218
CLASSROOM
CLASSROOM
B231
B229
3" SD UP/DN
(2,600 SQ FT)
MEDIA CENTER
PRINTED ON:
B234
B236
WC-2
WC-2
L-2
1 S-1
S-1 1
SOR
B239
L-2
3" SD
HALLWAY
HALLWAY
STAIR
B237
B247
B151
2" NPW
WC-1
BOYS
GIRLS
C205
B242
WC-1
3" V UP
TO VTR
WS-1
2" NPW DN
A 3
U-1
3" OD UP
2" V
2" V
2" V
1 S-1
U-1
WC-1
1 S-1
BOYS
B241
2
CLASSROOM
MULTIPURPOSE
CLASSROOM
B250
B249
B248
1 / P125
3" SD UP/DN
S-1 1
09/23/2014
WS-1
2" V
WC-1
A
2" V
ISSUE DATE:
U-1
3" V
REVISIONS:
B245
1336
U-1 A
3" SD UP
COMMONS
B240
3" SD UP
3" OD UP
3" OD
WS-1
2" V
PROJECT #:
3" OD UP
3" SD UP
TP-10
CJB
OFFICE
CHECKED:
OFFICE
4" W DN
2" NPW
DN
B238
B235
B246
B244
TJL
C200
IDF
DRAWN:
HALLWAY
CLASSROOM
CLASSROOM
HALLWAY
1" CW
1" HW
3/4" RHW
NORTH
9/12/2014 4:22:59 PM
3" SD UP/DN
B132
P123
GENERAL NOTES:
REGIS
G I NEE
18329PE
L
IONA
NOTES:
D PROFESS
TERE
OREGON
r.
M
O
H
NIC
6
S,
J
ar
9
ch
1 9 19
LA
IN
S P. C O L L
12-31-15
EXPIRES
3" SD UP/DN
(2,650 SQ FT.)
CLASSROOM
CLASSROOM
C209
C207
L-2
L-2
STAIR
HALLWAY
COMMONS
HALLWAY
C114
C210
C208
C206
3" SD DN
STAFF TOILET
C203
HALLWAY
3" OD UP
3" SD UP
C200
2" NPW
3" V
2" V
WS-1
2" V
S-1
3
S-1
3
S-1
4" V UP TO
4" VTR
4" V
WC-1
U-1 A
WC-1
U-1
GIRLS
C204
CLASSROOM
MULTIPURPOSE
CLASSROOM
C211
C212
C213
WS-1
WC-1
WC-1
BOYS
C205
PRINTED ON:
09/23/2014
PROJECT #:
ISSUE DATE:
REVISIONS:
1/8" = 1'-0"
9/12/2014 4:23:02 PM
NORTH
1 / P123
3" SD UP/DN
(2,600 SQ FT.)
CJB
3" SD UP
3" OD UP
2" V
CHECKED:
3" V
C202
WC-2
SOR
TJL
C200
DRAWN:
WC-2
S-1
HALLWAY
S-1
MS-1CUST 2" V
C201
TP-09
3" V DN
4
P125
G I NEE
18329PE
REGIS
L
IONA
D PROFESS
TERE
OREGON
r.
M
O
H
NIC
6
S,
J
ar
9
ch
1 9 19
LA
IN
S P. C O L L
12-31-15
EXPIRES
7.8 8.2
11.9 12
11
12.6
13
13.6
14
14.4
15
NOTES:
1. DOWNSPOUT FROM UPPER ROOF TO
LOWER ROOF. PROVIDE SPLASH BLOCK.
A
3" RD-2
3" SD DN
3" SD DN
3" RD-1
B.7
B.8
3" RD-2
3" SD DN
C
3" OD-1
3" RD-2
3" SD DN
3" RD-1
D.9
E
3" VTR
3" OD-1
3" RD-2
3" SD DN
3" VTR
3" VTR
1" VTR
3" RD-1
(3,900 SQFT)
3" VTR
G.1
2" OD-1
E.7
2" RD-1
(780 SQFT)
3" VTR
F
F.2
G
3" VTR
3" RD-2
3" SD DN
3" VTR
3" RD-2
3" SD DN
H.2
H
J
B.5
3" RD-2
3" SD DN
3" OD-1
3" RD-1
3" OD-1
B.3
PRINTED ON:
L
3" RD-2
3" SD DN
3" RD-2
3" SD DN
3" VTR
3" OD-1
2" RD-1
(780 SQFT)
2" OD-1
3" VTR
3" RD-1
(2,850 SQFT)
3" RD-1
(3,900 SQFT)
3" OD-1
3" VTR
2" OD-1
3" VTR
3" VTR
P
P.7
2" RD-1
(780 SQFT)
3" VTR
R
3" RD-2
3" SD DN
3" RD-2
3" SD DN
3" RD-2
3" SD DN
6.1
10
11
11.9 12
12.6
13
13.6
14
14.4
15
CJB
CHECKED:
5.4
TJL
DRAWN:
4.3
09/23/2014
ISSUE DATE:
1.9
1336
0.9
PROJECT #:
REVISIONS:
NORTH
9/12/2014 4:23:08 PM
B
C
P130
12
12
12.6
13
13.6
12.6
13.6
13
14
14
6.2
6.3
6.8
E
E
REGIS
D
18329PE
OREGON
r.
ar
6
S,
J
G I NEE
M
O
H
NIC
B300
D PROFESS
TERE
L
IONA
DN
MECHANICAL EQUIPMENT
PLATFORM
9
ch
1 9 19
LA
IN
S P. C O L L
E.7
12-31-15
EXPIRES
MECHANICAL EQUIPMENT
PLATFORM
B301
D.9
F
MECHANICAL EQUIPMENT
PLATFORM
A201
P.7
F.2
Q
11.9
12
13
13.6
14
13
13.6
14
NORTH
1/8" = 1'-0"
NORTH
NORTH
MECHANICAL EQUIPMENT
PLATFORM
C300
PRINTED ON:
TJL
4.3
DRAWN:
9/12/2014 4:23:13 PM
09/23/2014
1/8" = 1'-0"
NORTH
ISSUE DATE:
REVISIONS:
1336
PROJECT #:
DN
P131
RPBA-2
G I NEE
18329PE
REGIS
(5) 1" GV UP
L
IONA
D PROFESS
TERE
E
IRRIGATION
CONTROLLER
(BY LANDSCAPER)
OREGON
r.
M
O
H
NIC
1" CW
6
S,
J
ar
9
ch
1 9 19
LA
IN
S P. C O L L
12-31-15
EXPIRES
GWH-101
EMERGENCY GAS
SHUT OFF SWITCH.
RPB-1A
RPB-1B
GPRV-101
GWH-102
3" FS-4
1
P501
B-1
2" G
GPRV-102
RHWP-101
MMV-101
RHTWP-101
BOILER
A119
B-2
PROPANE TANK
CONNECTION POINT.
3" FS-4
2" PROP
DET-101
2" V UP
3/4" D DN
3" FD-2
3/4" G
3" FS-4
1 1/2" CW
2" PROP
1 1/2" HW
3/4" RHW
2" NPW
1 1/2" HTW
3/4" RHTW
GPRV-103
GPRV-104
EMERGENCY GAS
SHUT OFF SWITCH.
2 1/2" NPW
RWTS-101
3" G
3
P502
NOTES:
PRINTED ON:
09/23/2014
1/16" = 1'-0"
REVISIONS:
ISSUE DATE:
9/12/2014 4:23:17 PM
CJB
CHECKED:
NOTES:
RAINWATER CISTERN
SEE CIVIL
GENERAL NOTES:
TJL
2" NP LINE TO
BOILER ROOM
1336
PROJECT #:
DRAWN:
TP-11
1 1/2" G
P411
3/4"
3/4"
18329PE
REGIS
G I NEE
OREGON
r.
M
O
H
NIC
6
S,
J
ar
9
ch
1 9 19
LA
IN
S P. C O L L
RHWP-101
RHTWP-101
AIR INTAKE
GAS FLUE
AIR INTAKE
GAS FLUE
L
IONA
PRESSURE
GAUGE (TYP.)
PRESSURE
REDUCING
D PROFESS
TERE
E
CW
120 F HW
RHW
RHTW
140 HTW
12-31-15
EXPIRES
MMV-101
THERMOSTATIC
MIXING VALVE
ASSEMBLY IN
LOCKING CABINET
GWH-102
GWH-101
CHECK VALVE
(TYP.)
BALANCING
VALVE (TYP.)
DV
DET-101
DV
HOUSEKEEPING PAD
(TYP.)
GENERAL NOTES:
4" W
PW
GRATE
UNION
2" PW
SHUTOFF VALVE
CHECK VALVE
FLOAT SWITCH
SUMP
SUMP PUMP
NOTES:
1 PROVIDE LOCAL DISCONNECT FOR PUMP WITHIN
ELEVATOR SHAFT. SEE DIV.16 FOR REQUIREMENTS.
VENT UP
DETAILS - PLUMBING
WALL
CLEANOUT
WCO
TJL
CJB
DRAWN:
CHECKED:
09/23/2014
FOOTING VENT
ISSUE DATE:
REVISIONS:
FLOOR
1336
9/12/2014 4:23:19 PM
PRINTED ON:
FLOOR
ELEVATOR
SHAFT
NONE
PROJECT #:
WASTE
P501
REGIS
18329PE
OREGON
r.
M
O
H
NIC
6
S,
J
9
ch
1 9 19
LA
IN
S P. C O L L
CITY MAKEUP
1"
2"
G I NEE
ar
WATER METER
CONNECTION POINT
TO SKID
L
IONA
ULTRASONIC LEVEL
TRANSMITTER
D PROFESS
TERE
12-31-15
EXPIRES
1"
3"
CHEMICAL
INJECTION
PUMPS
2"
1
CHEMICAL
DRAIN
CTP/ CITY
WATER OFF
PRESSURE SWITCH
FROM RAINWATER
CISTERN
HYDRO
TANK
P
CTP/ CITY
WATER ON
3"
ORP
LWA
1
P
1
BAG FILTER
6"
6"
BAG FILTER
PRESSURE SWITCH
1
2 1/2"
2 1/2"
POLISHING BAG
FILTER
1 1/2"
2 1/2" NPW TO BUILDING
RAINWATER
METER
NOTES:
ROOF
NONE
GENERAL NOTES:
PRINTED ON:
1
P502
TO RAINWATER SYSTEM
MASTER CONTROL PANEL
RAINWATER SUPPLY
TO BUILDING
(SEE SHEET P411)
LEVEL TRANSMITTER
NPW
GRADE
FLOOR
TANK VENT
1
SD
RAINWATER METER
RWS
DETAILS - PLUMBING
SD
RWS
MAKE UP
WATER FROM WELL (DIV 22)
OUTSIDE BUILDING
RAINWATER CISTERN
RWSP-1
RAINWATER SUMP PUMP
(PROVIDED BY DIVISION 22)
NOTES:
TJL
CJB
DRAWN:
CHECKED:
09/23/2014
ISSUE DATE:
NONE
1336
REVISIONS:
PROJECT #:
9/12/2014 4:23:20 PM
P502
ROOF
3/4" CW
3/4" HW
1/2" RHW
3/4" CW
3/4" HW
1/2" RHW
1" CW
3/4" HW
1/2" RHW
1/2" CW
1/2" HW
1/2" RHW
L-1
WS-1
S-1
1
P411
3/4" CW
3/4" HW
1/2" RHW
1/2"
3/4"
L-1
L-1
1/2"
L-1
L-1
1/2" CW
1/2" HW
1/2" RHW
MS-1 L-1
L-1
WSCB-1
G I NEE
18329PE
CONTINUED BELOW
ar
9
ch
1 9 19
LA
IN
S P. C O L L
12-31-15
EXPIRES
1/2" RHW
3/4" HW
3/4" CW
1/2" RHW
1/2" HW
3/4" CW
1/2" CW
1/2" HW
1/2" RHW
S-2
L-2
DF-1
D PROFESS
TERE
OREGON
3/4" RHW
1" HW
1" CW
3/4"
L-1
1/2" CW
1/2" HW
1/2" RHW
1/2" RHW
3/4" HW
3/4" CW
3/4" CW
3/4" HW
3/4" RHW
2" CW
2" HW
3/4" RHW
S-1
1/2" RHW
1/2" HW
1/2" CW
S-1
M
O
H
NIC
3/4" CW
3/4" HW
1/2" RHW
S-1
1/2" RHW
1/2" HW
1/2" CW
L
IONA
LEVEL 2
S-1
1/2" RHW
1/2" HW
1/2" CW
r.
L-1
6
S,
J
WS-1
REGIS
DF-1
1/2" CW
1/2" HW
1/2" RHW
1/2" CW
1/2" CW
1/2" HW
1/2" RHW
S-2
L-2
S-2
WS-1
L-2
3/4" CW
3/4" HW
3/4" RHW
1/2" CW
1/2" HW
1/2" RHW
WS-1
WS-1
LEVEL 1
S-1
3/4" CW
3/4" HW
3/4" RHW
1/2" CW
1/2" HW
1/2" RHW
S-1
1/2" CW
1/2" HW
1/2" RHW
3/4" CW
3/4" HW
3/4" RHW
S-1
S-1
S-1
CW FROM CITY
ROOF
3/4" CW
3/4" HW
1/2" RHW
3/4" CW
3/4" HW
1/2" RHW
L-1
WS-1
S-1
1/2" RHW
1/2" HW
1/2" CW
S-1
1/2" RHW
1/2" HW
1/2" CW
S-1
S-1
1/2" CW
1/2" HW
1/2" RHW
S-1
WS-1
1/2" CW
1/2" HW
1/2" RHW
L-1
L-1
WS-1
S-1
3/4" RHW
3/4" HW
3/4" CW
1-1/2" CW
1-1/2" HW
3/4" RHW
1" CW
1" HW
3/4" RHW
LEVEL 1
S-1
3/4" CW
3/4" HW
3/4" RHW
1/2" CW
1/2" HW
1/2" RHW
S-1
S-1
1/2" RHW
3/4" CW
3/4" HW
3/4" RHW
1/2" CW
1/2" HW
1/2" RHW
S-1
S-1
L-2
L-2
MS-1 WH1
3/4" CW
3/4" HW
3/4" RHW
1/2" CW
1/2" HW
S-1 1/2" RHW
1/2" CW
1/2" HW
1/2" RHW
3/4" CW
3/4" HW
3/4" RHW
1/2" CW
1/2" HW
S-1 1/2" RHW
S-1
WH1
3/4" CW
3" VTR
3" VTR
ROOF
3"V
3"V
2"
PRINTED ON:
S-1
S-1
S-1
S-1
WS-1
WS-1
WC-1
WC-1 WC-1
2"
WC-1
U-1
U-1
4"
S-1
S-1
S-1
S-1
S-1
2"
WS-1
WS-1
WC-1
WC-1 WC-1
LEVEL 2
2"
2"
2"
WCO
2"
2"
2"
4"
U-1
S-1
2"
2"
4"
4"
S-1
S-1
S-1
S-1
S-1
L-1
WS-1
4"
LEVEL 1
FCO
FCO
WCO
4"
WS-1
WC-1 WC-1
4"
WC-1
WCO
WC-1
U-1
S-1
2"
2"
4"
2"
S-1
S-1
2"
2"
S-1
S-1
S-1
WCO
WCO
WCO
2"
WH1
WC-1
U-1
WCO
2"
S-1
U-1
S-1
S-1
S-1
S-1
S-1
WS-1
FCO
WS-1
WC-1 WC-1
4"
WC-1
S-1
L-1
2"
S-1
WC-1
U-1
U-1
S-1
S-1
S-1
WCO
TJL
CJB
DRAWN:
CHECKED:
09/23/2014
ISSUE DATE:
NONE
1336
REVISIONS:
6"W
PROJECT #:
9/12/2014 4:23:22 PM
2"
3/4" CW
3/4" CW
NONE
3"V
1/2" CW
1/2" HW
1/2" RHW
3/4" CW
3/4" HW
3/4" RHW
3/4" CW
3/4" HW
3/4" RHW
3"VTR
S-1
1/2" RHW
1/2" HW
1/2" CW
3/4" CW
1/2" CW
1/2" HW
1/2" RHW
3/4" CW
3/4" HW
3/4" RHW
S-1
3/4" CW
3/4" HW
3/4" RHW
1/2" HW
3/4" CW
3/4" HW
3/4" RHW
S-1
3/4" CW
3/4" HW
3/4" RHW
1/2" CW
1/2" RHW
3/4" HW
3/4" CW
3/4" CW
3/4" HW
3/4" RHW
1/2" CW
1/2" HW
1/2" RHW
1/2" RHW
1/2" HW
1/2" CW
1/2" RHW
1/2" HW
1/2" CW
LEVEL 2
S-1
L-1
1/2" CW
1/2" HW
1/2" RHW
WS-1
1/2" CW
1/2" HW
1/2" RHW
3/4" RHW
1" HW
1" CW
1/2" CW
1/2" HW
1/2" RHW
1/2" CW
1/2" HW
1/2" RHW
P601
EXTERIOR WALL
GV
GV
GV
GV
2"
1/2"(199 CFH)
GPRV-104
GWH-101
(199 CFH)
GPRV-102
D PROFESS
TERE
N
G I NEE
18329PE
2"
1-1/2"(2000 CFH)
L
IONA
B-1
(2000 CFH)
GPRV-101
GPRV-103
REGIS
GV
ROOF
OREGON
2"
1/2"(199 CFH)
GWH-102
(199 CFH)
ar
GPRV-105
9
ch
1 9 19
LA
IN
S P. C O L L
1"
MPG
MPG
3/4"
1-1/2"
GAS METER
2505 CFH
2 PSI @ OUTLET
r.
6
S,
J
2"
1-1/2"(2000 CFH)
M
O
H
NIC
B-2
(2000 CFH)
3/4"
1/2"
12-31-15
EXPIRES
2-1/2"
33
32
31
MPG
GAS SERVICE BY
LOCAL GAS COMPANY
NOTES:
GENERAL NOTES:
1. EQUIVALENT LENGTH OF PIPE FOR "MPG" WAS MEASURED FROM GAS METER TO GPRV-105.
2. EQUIVALENT LENGTH OF PIPE FOR "G" WAS MEASURED FROM GPRV-105 TO KITCHEN EQUIPMENT.
2 REDUNDANT EQUIPMENT.
2"
1-1/4"
1-1/2"
2"
WC-1 U-1
2"
A
WC-2 WC-2
U-1
WC-1 U-1
2"
WC-2 WC-2
U-1
WC-1 U-1
WC-2 WC-2
LEVEL 2
2"
2"
1-1/4"
1-1/2
2"
U-1
WC-1 U-1
WC-2
WC-1
WC-2 WC-2
WC-2
A
WC-2
1-1/4"
A
1-1/4"
A
U-1
1-1/2"
WC-1 U-1
WC-1
1-1/2
A
2"
2"
S
1-1/4"
2"
A
A
U-1
WC-1 U-1
1-1/4"
WC-2 WC-2
U-1
WC-1 U-1
2-1/2"
WC-2 WC-2
1-1/2"
U-1
2"
2"
2"
2"
ROOF
NONE
LEVEL 1
RWTS-101
PRINTED ON:
TB
RISER DIAGRAMS - PLUMBING
GENERAL NOTES:
1. SIZE SHOCK ARRESTORS IN ACCORDANCE WITH PDI STANDARDS.
NPC
CHECKED:
TJL
09/23/2014
ISSUE DATE:
REVISIONS:
NONE
1336
DRAWN:
PROJECT #:
9/12/2014 4:23:25 PM
LEVEL 1
P602