Ru les

Work with a valid work permit (PTW) required by the job

#,w

Pfw

Verify energy isolation before starting work

Obtain authorisation before overriding or disabling


safety critical equipment

Obtain authorisation before entering

confined

space

Protect yourself against

a fall when working

at

height

,
Ef

\J

Use the correct personal protective equipment (PPE)


when handling hazardous chemicals

before excavarion or entering

llliinr"thorisation
Do not position yourself under a suspended load

Do not smoke outside designated areas or bring


potential ignition sources into process areas without
authorisation

Do not use your mobile phone/walkie-talkie while


driving, follow the speed limit and use your seat
belt

Rules

Dltr

ZTGII

Work with a valid work permit (PTW) required by


the job

Verify energy isolation before starting work

rw

Have you:

on the

Have you:

Been. briefed V, y.oyr^ supervisor


requrrements ol the lobl

Ensured compliance to all requirements of the PTW?

safety

Been trained and are competent to carry out the job


safely?

Been briefed by your supervisor on the safety

,/

Checked that the PTW and relevant certificates such


as physical isolation certificate, electrical isolation
certificate and radiatior certificate have been
approved?

ldentified the hazards and assessed the risks?

ur Putin place appropriate control and recovery measures?

requirements of ihe job?

,/ Checked that the risht piece of eouioment

machinery has been ilated, locked arid iagged?

or

7'

Communicated the permit and certificate requirements


to your team members?

,/

ut

Displayed the permit and certificate at the place of work?

,/ Confirmed that all stored energy has been safely


released?

u/ Obtained the right too.ls.and equipment and

ensured

Secured an individual
relevant lockout box?

they are rn good condrtlonl

,r/ Obtained the correct


.,/

Secured any, movable equipment or machinery that


you are working on?

PPE

or department lock at the

for the job?

Been briefed on the emergency procedures?

Ensured that all guards a,nd s.afety systems are put


back when wor[< rs completedl

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

PTW is a written and signed statement by an authorised person for work


to be carried out under stated precautions.
Reference: PTS 60.2001 - PETRONAS Croup Cuidelines for Permil to

lsolation of energy systems including mechanical, electrical, hydraulic,

Work System

thermal, chemical, pneumatic and ionising radiation.


Refrence: PTS 60.2117 - Energy lsolatiot-t Standard

Obtain authorisation before overriding or disabling


safety critical equipment

Obtain authorisation before entering a confined


space

Have you:
Have you:

,/

Been briefed y y.oyl supervisor on the safety


requrrements ol the Jobl

..r/ Checked whether the risk assessment has been


' conducted and approved?

./
'

Obtained an approved certificate and valid PTW


before overridig or disabling safety critical

equipment?

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

u/

Been briefed y your supervisor on the safety

requirements of the job?

JTtt,{39 confined space entry training and been


_7
v Been certified medically
entry?

fit for confined

space

'

Obtained..g PTW go.mp[e,!e with confined space


entry certificate and checklist?

Been briefed on entry requirements?

.r/
'

Ensured ga.s tests are carried out prior to entry and


as requird by the PTW?
Registered with a competent stand-by person at the

entry porntl

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

Confined space is a space that is large enough for personnel to enter,

entl and is ot deiigned for normal or


continuous occuDancv.
Reference: PTS 60.2tbS - fntry lnto Confined Spaces
has limited'or restricted means of

Refrence; PTS 60.2212 - Bypassing of Safety Critical Equipment

Protect yourself against a fall when working at height

Use the correct personal protective equipment (PPE)


when handling hazardous

chemicats

Have you:

Been briefed by your supervisor on the safety

requirements of

5!:l:1Jjt:|!l"

ihe';ob?

Have you:

'

platform has proper guard rails and

Used only approved scaffoldingwith valid inspection

tag(

v-7

Secured your tools and equipment


to prevent them
I I
from fallihg from height?

-/
'

Ensured three points of contact is maintained at all


times when usng the ladder?

Been briefed by your supervisor on the safety


.7
v requirements
of ihe';ob?
and are competent to handle
/
'

|n"S,Jjti"o

-/
'

Understood the safety data sheet (SDS), chemical


gafgll^data sheet (CSDS) or material safety data sheet
(MSDS) of the chemicals?

Read ald understood


uz
' chemical
handling?

the procedure for

Checke.d th" nearest-eye


wash, emergency
' and
'r/
spill cleaning kit? '

safe

shower

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

Working at height means working above 2 metres.


Reference; PTS 60.2104 - Working at Height
.lE

Chemical handling is the safe operations of receiving, storing, discharging,


transporting and disposing chemicals.
Reference: PTS 60.1502 - Chentical Management Program
',4

Obtain authorisation before excavation or entering


a trench

Have you:

u/

t position

L/

Have you:

Been. briefed V. ygyr supervisor


requrrements o1 the .obl

on the

safety

Checked for buried services and other hazards?

Checked that the issued PTW


excavation certificate?

/
uz

is complete with

,/

Excavated manually usinq spades with wooden


,/ handles
to. expose' burie services before using
Ensured a correct shoring system is put in place with
appropriate underground rotectioil meaures?

rigid signs and barriers around

Provided safe access and egress


trenches?

Checked that all lifting equipment have been tested


and certified by authorities?

Checked that the load is within the safe working


load of the lifting equipment?

the

to excavation

are
,/ Ensured confined space entry procedures
a.pplied for excavatin of mor than ,l.5 metres

Ensured that th.e operator, rigger and signal man are


competent and cehfied?

Ensured a lifting plan has been prepared and the


l!ft. is .assessed 6y a competent ers'on for critical
lifting?

mechanical eqipment?

excavatonl

Been briefed by your supervisor on the safety


requirements of the job?

Obtained a PTW and lifting certificate?

Ensured eme.rgency plans and procedures have


been put in plate?

Erected.

yourself under a suspended load

Checked that the tagline is attached to the load?

,/

Barricaded the area?

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

deepl

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.
Excavation s work that involves a man-made cut, cavitv, trench or
depression in the earth's surface formed by earth removal'. Trench is a
narrow excavation made below the surface of the ground.
Rerferenc.e: PTS 60.21

l6 - f xcattation
,to

Lifting operations .are lifts. utilising all mechanical lifting devices such as
cranes, hoists and chain blocks. Re-f-ere,-nce: Pl-S 60.2103 - Litting Ope:rations
t1

Rules

Do not smoke outside designated areas or bring


potential ignition sources into process areas
without authorisation

Do not use your mobile phone/walkie-talkie while


driving, follow the speed limit and use your seat
belt

Have you:

Have you:

Been briefed V. your supervisor on the safety

,/

,,/

Rectified or eliminated leaks immediately?

,r/ Completed the specified daily checks and ensured

u/

Ensured hot work permit is obtaned and gas tests


done betore carrying out hot work?

,r/ Checked that seat belts are available and worn by all

hot work permit before using enginedriven equipment, vehicles and any otheapotential
ignition sources in process areas?

.,,/ Secured all materials and equipment carried by the


vehicle?

,/

requirements of the job?

.,r/ Obtained

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

Been authorised to operate the vehicle and have


valid driving licence?'

the vhicle can be operated sfely?


occupants?

uz Adhered to all traffic regulations?

the vehicle is used for its intended

Ensured that
purpose?

Ensured IheI your vehicle's engine is not left running


unattended?

lf you are facing difficulty with any of the requirements, consult


your supervisor before starting a job.

lgnition sources nclude mechanical sparks, fire, hot surfaces, auto


gniton, pyrophoric materials, mechanical impact, friction, electrical
eq u i p me nt an d e I ectrostatic.
Re/rence: PTS 60.2123 - lgniton -9orce Control

Driving is the operation of all types of roa


owned, leased and hired vehicles and those
Reterevrcer; PTS 60.2401 - LandTransportat
Nlinintum Stardarcls ancJ Key Perforntance
4E