1.

SHEET METAL DUCTING MUST BE GALVANIZED MILD STEEL,


WITH MEZZ-FLANGES. ALL HVAC EQUIPMENT TO BE
ADEQUATELY SUPPORTED AT REGULAR INTERVALS WITH
SUITABLE THREADED ROD AND ANGLE BAR, AS PER SABS 0193.
2. ALL DUCTWORK, JOINTS MUST BE PROPERLY SEALED AND
AIRTIGHT.
3. GRILLES MUST BE CURVED BLADE TYPE WITH OBD'S AS
INDICATED ON DRAWING.
4. EXPOSED DUCTING MUST BE PAINTED TO ARCHITECT'S
SPECIFICATIONS.

5. THE HVAC CONTRACTOR, TO WIRE BETWEEN THE HVAC


EQUIPMENT /FANS AND THE A/C ELECTRICAL PANELS.

6. ALL FIRE DAMPERS MUST BE 350mm LONG ELECTROVENT OR


EQUAL AND APPROVED.

A
04

D
04

7. ALL WASHABLE FILTERS MUST BE INSTALLED WITH PLEATS IN


THE VERTICAL.
8. ALL BASEMENT VENTILATION FANS MUST HAVE APPROPRIATE
FIRE RATED MOTORS.
9. SOUND ATTENUATORS MUST HAVE 150mm AIR GAPS WITH
LENGATS AS INDICATED.

fire door

10. ALL FANS MUST BE MOUNTED ON ANTI-VIBRATION MOUNTINGS.

gas bottle in
lockable cage

1. 120mm HIGH CONCRETE PLINTHS INSIDE ALL PLANTROOMS AS


INDICATED ON DRAWING.

fire door

MALE

whb

cashiers

whb

refridgeration by
specialist

mechenical
ventilation

meat display fridge

fridge

D/B

PANTRY

HVAC to
mechenical
engineer's details

whb x3

BUTCHERY

PARAP
LEGIC

DUCT

150x200

200x200

wc

150
50l/s

wc

150
50l/s

whb

ur
150
50l/s

whb

whb

150
wc
50l/s

150
wc
50l/s

150
wc
50l/s

300x200 DOOR
GRILLE

structural wall to
engineer's details

FEMALE

whb whb

300x300 DOOR
GRILLE

GRILLE

REFUSE
AREA

ur

whb300x300 DOOR

6. ALL PENETRATIONS THROUGH WALLS MUST BE COMPLETE


WITH 25mm TIMBER FRAME FOR THE SCREW FIXING OF
WEATHER LOUVRES & GRILLES.

C
04

Tap

150
50l/s

MALE

tills counter

ramp up

200

PARAPLEGIC
80l/s

5. FIRE STOPPING & SEALING OF ALL DUCT & PIPE ENTRIES INTO
RISER SHAFTS TO ARCHITECTS DETAIL.

UP

300x300

200x300

solid steel
gates

300x300 DUCT
FROM ABOVE

ur

COVERD
WALKWAY

DRY STORE

drain

CASHIERS

fire wall

COVERED
BRAAI AREA
36 PPL

soft drinks
fridge

whb

demountable
screen
glass
partition

UP

SUPPLY AIRAIR FLOW DIRECTIONAL ARROW

RETURN AIRAIR FLOW DIRECTIONAL ARROW

external fire
escape concrete
staircase to
engineer's details

UNDER CUT DOOR

STORE
ROOM
glass door

str cl

str cl

str cl

B
04

DISK VALVE

PROPELLAR FAN

DOOR GRILLE

SQUARE ATTENUATOR

INLINE FAN

CYLINDRICAL ATTENUATOR

Store
Room

SUPPLY AIR
SQUARE DIFFUSER

ROOF MOUNTED FAN

B04

REFRIGERATION PIPING

ENTRANCE
POCH

HVAC to mechenical
engineer's details

HVAC to mechenical
engineer's details

GROUND FLOOR
HALL (84 PPL)

gradual ramp up from tar to ffl @ 1:12

CONDENSATE DRAIN PIING


Db02

INTERNALY LINED WITH SONIE LINER


EXTERNALY LINED WITH 25mm FRK.

str cl

E04

str cl

str cl

2
line o

f roo

D
04

H/R

Db01

line of roof over

E04

WN

structural beam
above, to
engineer' details

steel & timber


staircase to
specialist

01/08/2016 ISSUED FOR TENDER

f ove

UP

planter

C04

4. CUTTING OF PENETRATIONS THROUGH CONCRETE SLABS &


BRICK WALLS FOR HVAC EQUIPMENT COMPLETE WITH THE
MAKING GOOD & PAINTING AFTERWADS.

external fire escape


steel staircase to
engineer's details

male & female toilets


mechenically ventilated

150x200

whb

structural beam
above, to
engineer' details

COLDROOM

D/B

whb

cutting
counter

ur

FEMALE

3. BUILDING-IN THE TROX AIRTIGHT DOORS SUPPLIED BY THE


HVAC CONTRACTOR.

H/R

extraction to
specialist

store

special
door

sink

fridge

built in
firewood braai

shr

whb

fire wall

ur

lockers

fridge

wc

Gas cooker with


extractor canopy

wc

KITCHEN

wc

2. PLANTROOM FLOORS MUST BE TREATED TO ARCHITECTS


SPECIFICATIONS.

line of roof over

RHANGA ENGINEERING & PROJECTS


(REP)

COSMO CITY PUB


1. POWER SUPPLY & ISOLATORS TO ALL ACDB'S AS INDICATED,ON
DRAWING COMPLETE WITH CONDUITS, DRAW-WIRES &
JUNCTION BOXES.
2. ADEQUATE LIGHTING INSIDE PLANTROOMS - COMPLETE WITH
ON/OFF SWITCHES ON THE OUTSIDE OF PLANTROOMS.
3. ELECTRICAL POWER SUPPLIES & ISOLATORS WITHIN A METER
OF EACH VENTILATION FAN.

GROUND FLOOR PLAN


HVAC LAYOUT
WN

WN

2013MV-001

02/08/2013

1:100

-----