ESCUELA
PROFESIONAL:
INGENIERIA EN ENERGIA
ALUMNO:
SOSA DIAZ YHONATAN
VILLENA RAO VICTOR EDUARDO
TRIGOSO MORALES GABRIEL
2012
TOMA DE DATOS
Bomba 1
N
2300
2300
Altura de la Bomba 1
Hb1
7.912500
02
8.931500
01
8.931500
01
9.441000
01
9.9505
10.46
11.479
11.9885
12.498
Altura de la Bomba 2
Hb2
8.9315
9.9505
10.6638
11.3771
12.19230
02
12.1923
12.7018
13.0075
13.1094
Tabulacin del clculo de las alturas de las bombas y su grafica
correspondiente
Q (m3/s)
Hb1
7.912500
02
8.931500
0.0025
01
8.931500
0.002166
01
9.441000
0.00166
01
0.00283
0.0013
9.9505
0.001
0.00075
0.0005
0.000333
10.46
11.479
11.9885
12.498
Hb2
Hb1+
Hb2
8.9315
16.844
9.9505
18.882
10.6638
19.5953
11.3771
20.8181
12.19230 22.14280
02
02
12.1923 22.6523
12.7018 24.1808
13.0075
24.996
13.1094 25.6074
30
25
20
Hb1+ Hb2
15
Hb1
Hb2
10
5
0
0
TOMA DE DATOS
Bomba 1
N
Q (m3/s)
0.00316
0.00283
0.00233
0.002
0.00166
0.00133
Bomba 2
2300
P2
0.25
1
1.15
1.2
1.25
1.32
P1
0.8
0.8
0.5
0.2
0.1
0
N
2300
Q (m3/s)
P2
P1
0.001194
0.75
0.2
0.001
0.82
0.2
0.000805
1
0.19
0.000638
1.15
0.17
0.000444
1.18
0.16
0
1.21
0.16
AHORA PROCEDEMOS A HALLAR LAS ALTURAS PARA CADA BOMBA ULTZANDO
LA SIGUIENTE FORMULA
HB=10.19 (P2-P1)+2.068 x10-3Q2+0.27
Altura de la bomba 1
Hb 1
10.9695
18.612
17.0835
14.536
14.0265
13.7208
Altura de la bomba 2
Hb 2
9.9505
10.6638
12.3961
13.7208
13.9246
14.2303
Hb 1
Hb 2
10.9695
18.612
17.0835
14.536
14.0265
13.7208
9.9505
10.6638
12.3961
13.7208
13.9246
14.2303
Hb 1 +
Hb2
20.92
29.2758
29.4796
28.2568
27.9511
27.9511
35
30
25
20
Hb 1 + Hb2
Hb 1
15
Hb 2
10
5
0
0
P2(bar)
0
0
0.26
0.7
1
1.2
Hb
2.308000
01
2.308000
01
4.957400
01
8.931500
01
11.479
13.517
Hb
2.308000
01
2.308000
01
4.957400
01
8.931500
01
11.479
13.517
Hb
16
14
12
10
Hb
8
6
4
2
0
0