Documente Academic
Documente Profesional
Documente Cultură
Presentation Outline
Landslide Hazard Mitigation Works
1.
Project Background
2.
3.
4.
5.
Public Relation
1. Project Background
Project Background
An existing development at On Yam, Shek Lei,
Victoria Road and Luk Keng Wong Uk is affected by
Natural Terrain Landslide Hazards
Ove Arup & Partners Hong Kong Ltd (Arup) was
commissioned to undertake detailed design of
hazards mitigation works for these sites
Project Background
Proposed Natural Terrain Hazard Mitigation Works:
Tensioned Steel Mesh Fences at Victoria Road, Shek Lei and Luk Keng
Wong Uk
Rigid Barriers at Victoria Road, On Yam and Shek Lei
Soil Nailing at Victoria Road, Shek Lei and Luk Keng Wong Uk
Baffles at On Yam and Luk Keng Wong Uk
Upgrading works including soil nailing with grillage / concrete slab, retaining
wall structures at man-made slopes within Victoria Road site and Luk Keng
site (Integrated approach)
Contract Period :
Total Contract :
Sum
Victoria
Road Site
Pokfulam Road
VTC Pokfulam Training
Centre Complex
Recent major
landslides in
1966, 1994, 1999
and 2005
Baguio
Villa
Victoria Road
Baguio
Villa
Residence Bel-Air
Cyberport
1994 Lanslide
1999 Lanslide
2005 Lanslide
1998 Landslide
1997 Landslide
Luk Keng
Wong Uk Site
On Yam
Estate
Shek Lei
Estate
VTC Pokfulam
Victoria Road
C
C
E
E
H
H
Sub-station
J
I
Baguio Villas
Victo
ad
ria Ro
Cyberport Road
Residence Bel Air
Study Area
Catchment Boundary
L
M
Victoria Road
C
C
EE
H
H
A
G
Baguio Villas
Victo
ad
ria Ro
Cyberport
Baguio Villas
Sub-station
Cyber Port Road
Residence Bel Air
Study Area
Catchment Boundary
J
I
Sub-station
E
C
N3.1
E7.1
D
E
B
B
G
On Yam
Estate
400cu.m. Channelised
Debris Flow (CDF)
Toe facility : On Yam
Estate
Legend
Study Area
Shek Lei
Estate
400cu.m. Channelised
Debris Flow (CDF)
Catchment Boundary
VTC
HKAPA
Feature No. 11SW-C/F187
Soil Nailing with
Grillage
Soil Nailing
Victoria Road
Baguio Villa
Tensioned Steel
Mesh Fences
Reinforced-concrete Barrier
supported by Mini-piles and Soil
Nails
Cyber Port
Works Site
Proposed RC Barrier
~ 5m
Proposed Soil Nails
~ 5m
Proposed Mini Pile
OHL in Catchments
Mass Concrete
Protection
Existing Ground
Profile
Foundation for
Post
VTC
Secondary
site office
Ca
ble
Tu
nne
l
HKAPA
Proposed works
scatter on
hillside
Victoria Road
Baguio
Villa
Proposed loading/
unloading areas
existing streamcourse
Proposed loading/
unloading areas
0m
50 m
100 m
Works Site
Tensioned Steel
Mesh Fences
Existing pipeline to be
upgraded
Trapezoidal Channel
with Baffle Wall
Works Site
10
120.4
80
Environmental sensitive
area / Fung Shui
Woodland / Pat
Sin Leng Country Park
located within the site
Environmental
Permit Specific
Permit Conditions
121.4
10 0
80
Rare species to be
protected
60
Specific requirements
from AFCD (e.g.
deployment of tree
expert)
40
Rare species
40
TS
1
20
6.8
Luk Keng
Primary School
ET
La t
10
3
R
L
14.4
6.6
12.9
Playground
7
5
RCP
10
11
3.7
12A
AD
12
17
18
19
20
21
22
23
ROAD
3.0
3.7
W
L
2.8
Basketball
Court
24
P la y
25
g ro u
26
27
28
29
30
31
32
33
45
46
nd
39
41
42
43
44
FP
L
2.3
34
35
36
37
38
E
E
LUK
2.0
50 m
2.2
1.8
2.7
Pond
1.8
KENG
FP
25 m
ET
0m
6.6
Secondary
site office
2.7
47
13
3.1
48
Playground
3.6
53
54
14
S hr
55
15
RO
56
16
R
8
57
ROAD
Works Site
Baffles supported
by Soil Nails
Reinforced-concrete
Barrier supported by Minipiles and Soil Nails
Works Site
existing
streamcourse
wer Cable
Overhead Po
Approx location
of works site
Vesting Order of On
Yam Estate
Proposed Loading/
Unloading Works Area
Proposed
Temporary Works
Areas
EVA
Sports Court
On Yam Estate
Works Site
Reinforced-concrete
Barrier supported by
Mini-piles and Soil
Nails
Tensioned Steel
Mesh Fence
Soil Nailing
Works Site
Existing
streamcourse
Temple
Proposed
Temporary
Access
Existing
Streamcourse
Proposed
Temporary Works
Area
Tree-felling
(applied
and approved)
EVA
0m
20 m
40 m
Proposed
Temporary
Access
Proactive liaison
with HD, PMO and
local residents
Works Site
Gabion Wall
Leung King Estate
Deflection Barrier
Victoria Road
Boulder Fence
Mid-Levels
5. Public Relation