Technical Site Survey Report

Document Number: TT_Network_ TSSR_THR0944-A_APCO_07-April-2015_REV00

Technical Site Survey


Report
Site Name :
Saleh
Abad
Candidat
e ID:
TSS
Date:

THR0944_A
06-April-2015

Versio
n:

00
Objective
This document is intended to define the Form of Technical Site Survey
Report for Tamin UTRAN Project.
This document will serve as reference for both parties and eventual third
parties involved in this project. It will serve as reference in carrying out Site
Acquisition services in the roll out of Tamin Telecom network in Iran.

Technical Site Survey Report


Summary List:
1. Basic site information 4
2.Access 4
3. Site Map

4.Google Map

5. Site features

6.Existing Typology
7. Rooftop sites

8. Greenfield site 8
9. Grounding System For Existing Site 9
10. Maintenance 9
11. Power supply 9
12. Site Acquisition general comments 9
13. BTS Configuration and Antenna System
14. Aerial System

10

10

15. Transmission 11
16. Obstacle

12

17. Photos

13

18. General Comments 30


19. List of sketch drawings
20. Sketch drawings

30

30

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 1/32

Technical Site Survey Report


Participants and agreement Decision to proceed with site / AP Drawing
All participants on the Technical Site Survey agree that the following specifications have
been decided on site and they have reached a Decision to Proceed with the Site Design
drawing. This report is verified and approved by the signatures in this table.
Company/
Representative Name

Title

Signature

Phone

E-mail

Document
Owner
1.

2. Site Design
Engineer

Atipooyesh/Ms Ganji

Status of technical site survey

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 2/32

Technical Site Survey Report

TECHNICAL SITE SURVEY REPORT


SUBCONTRACTOR: Atipooyesh

1. Basic site information


TSS Report
by:
Site ID:

Ahmad Eshghi
THR0944

Site Name:

Candidate:

Saleh Abad

Site Type

Metro

Nominal
Coordinate
Candidate
Coordinate

Related Municipality:

Hub

Cell

Macro

19

Micro

Pico

35.606880
35.606880

Distance to Nominal
Point

Femto
51.377840

Altitude

51.377840

1095

Azimuth (from
Nominal Point)

0m

0Deg

38 )(

Address:
Region/Zone:

Wind
speed

19

<=130km/h

>130km/h

Landlord(s)or Representative (Names)(At least 2 landlord mentioned, if exists):


Lan
dlo
ard
1
Lan
dlor
d2

Mr Maleki
No 38 , Nikkar Allay , Arayeshi Street , Saleh Abad Town ,
09127996682 & 02155532259

Name:
Address:
Phone:
Name:
Address:
Phone:
Lan Name:
dlor Address:
d3 Phone:

2. Access
Site access:
difficult

Normal

Difficult

Very

RF Site Access Width(stairs): 1.7 m


Access road:
(Show on sketch
drawings)
Transport to site:
Truck

4WD

Lifting method:

No

Yes

Access Road Width:

6 m

Hard standing

To be modified

Gravel or not stabilized

To be established

Not possible by vehicle


Crane
No need

Access Ladder type for rooftop


Folding wooden ladder
New fixed ladder;
Access
Description
( including
difficulty Access
describe)

24h*7d
Access:

Rooftop
Access:

Stairs

Elevators

Cherry picker
Others (specify):
New removable ladder

Not needed

In all sessions of access to rooftop the manager of the building


should be informed.

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 3/32

Technical Site Survey Report


3. Site Map (candidate locations Kruki)

Site Location
ID 38

4. Google Map

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 4/32

Technical Site Survey Report


5. Site features
Poor condition of existing
structure (mast, chimney, etc.)

No problems

Poor condition of roof covering


(e.g. tiles)

Roof modification needed


Structural
Suitability

Poor condition of existing wooden


structure

Fragile structure/surface
(specify):

Modification of existing structure


needed (specify):

Special civil work jobs


(specify):

Significant structural factors


(specify): RT coolers have to be replaced for mast installation
Structural measurements done for
rooftop

Yes

Greenfield
(specify ):

Site Profile

No
Rooftop

impossible
New

No need

Mosque

Chimney

Other

Comments:

6. Existing Typology
Existing Antenna supporting structures on Site: (Pole 6 m,
Lattice tower )
Number all the existing Antennas support clockwise starting from the north using OP1, OP2
Show the location poles on the sketch map with respective their numbers.
OP1
Type
(LT,GM,PO,
RDS,
Monopole)

POLE

Height (m)

6m

OP2

OP3

OP4

OP5

OP6

OP7

OP8

OP9

OP10

OP11

OP12

Existing Equipment (to be shown on sketch map)


Indoor

Outdoor

Existing
Number all the existing Element starting from the north using E1,E2
Show the location poles on the sketch map with respective their numbers ( for Each pole there should be
separate table).
OP1
E1
E2
E2
E3
E4
E5
E6
Type (Radio, MW,
ATN1
ATN2
ATN3
MW1
MW2
RRU)
Height ( from bottom
of the tower to the
19m
19m
19m
21m
21m
middle of elements)
Size of Element

0.3

0.3

Azimuth

30

150

290

90

260

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 5/32

Technical Site Survey Report


7. Rooftop sites
Shelter type and Location
Shelter on Ground
Building Type

Shelter on Roof

Steel Structure

Existing Tower On
Yes
Site
No
Existing
Room
New
Total
Available
L:14.4m
Space
Building
height

Outdoor Cabinet

Concrete Structure
Specify
:

T6

Dimensions

L:

W:5.7m

Site Space

Floor
Numbe
r

15m

Existing Room

mm

W:

mm

L:4

W:2.5

Elevator Available

H:
mm

YES

No

Outdoor BTS Platform Location:


Outdoor Platform on Ground
I-Beam needed for BTS:

Yes

Outdoor Platform on rooftop


No

Expansion available:

Others:
Yes

No

New Antenna supporting structures on Rooftop: (Pole 6 m,


Lattice tower )
Number all the existing Antennas support clockwise starting from the north using
TTP1, TTP2
Show the location poles on the sketch map with respective their numbers.
TTP
1
Type:
(LT,GM,PO)

WS

Height(m)

12
m

TTP2

TTP3

TTP4

TTP5

TTP6

TTP7

TTP8

TTP9

8. Greenfield site
New Tower

Existing

Other:

Shelter on Ground

Tower Type
24M Monopole loading: 8.5sqm

Outdoor Cabinet

36M Monopole loading: 8.5sqm

24M Lattice Loading: 12sqm

24M Lattice Loading: 16.5sqm

24M Lattice Loading: 25sqm

36M Lattice Loading: 12sqm

36M Lattice Loading: 16.5sqm

36M Lattice Loading: 25sqm

48M Lattice Loading: 12sqm

48M Lattice Loading: 16.5sqm

48M Lattice Loading: 25sqm

54M Lattice Loading: 12sqm

54M Lattice Loading: 16.5sqm

54M Lattice Loading: 25sqm

Total Available Space

Site Space

Diagram of Obstacles Done:


No

Yes

Rainwater Drainage System Required:

Fencing Required:
Yes

Yes

No

No

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 6/32

Technical Site Survey Report


Nearest power pole distance
(m):

N/A

9. Grounding System for Existing Site


Grounding System Available

Yes

No

Earth Value:

Distance from MGB Main Grounding


Bar to Equipment (m)
TGB Tower Grounding Bar Available
MGB available Outdoor
MGB available Indoor
Photo Taking

Yes
No
Yes
No
Yes
No
Yes
No

If Not Available, Require...PCS


If Not Available, Require.PCS
If Not Available, Require.PCS
Remark

10. Maintenance
Access

Normal access
By lift or crane
Ladder on rooftop
Other significant factors (specify): Working Hours

11. Power supply


Regional Electricity Company (REC) Name: Resalat
Voltage configuration:

Mono Phase

Three Phase

AC Meter Box (position must be shown on sketch drawings):


Installed Outdoors
Installed Indoors
Installed on Shelter
Power requirement:

Min 18 KW (Three phase)

Distance from existing power source

Other location (specify):

Specific KW value:
25

12. Site Acquisition general comments


Special permits
required:

Site owner requests:

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 7/32

Technical Site Survey Report


13. BTS Configuration and Antenna System
The first sector will be the first one from north in clock wise.
NodeB Type:
Configuration:

BTS
U (2100):

3+3+3

RADIO ANTENNA SYSTEM : Tri-Band

Sector A
Sector B
Sector C

DBS

U (900):

1+1+1

Dual-Band

Single Band

Azimuth

Brand

Reference

Height (BH + R
+ on Tower)

Mech.
Tilt

Elec.Tilt
(900)

Elec.Tilt
(2100)

60
180
300

Kathrein
Kathrein
Kathrein

80010291
80010291
80010291

15+9
15+9
15+9

0
0
0

8
8
8

6
6
6

Diplexer

TTP
N
TTP1
TTP1
TTP1

14. Aerial System


TYPE

Jumper
Length

Sector A
Sector B
Sector C

R3808
R3808
R3808

4
4
4

Sector A
Sector B
Sector C

R3908
R3908
R3908

4
4
4

Optical Fiber
length

RRU 2100 MHz


34
34
34
RRU 900 MHz
34
34
34

DC cable length

DC cable
diam.

TTP N

34
34
34

35mm
35mm
35mm

TTP1
TTP1
TTP1

34
34
34

35mm
35mm
35mm

TTP1
TTP1
TTP1

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 8/32

Technical Site Survey Report


15. Transmission
Transmission Level:

Access

Transmission Type:

MW

Hub

Metro

Aggregation

Leased Line

Microwave Link Information:


Information per link

Link 1

Link 2

THR0977

THR0966

78

303

15+10

Link distance (Km)

0.920km

1.53

Antenna Size (m)

0.3

Dish number

Pole number
Line of sight
(OK/NOK)

OK

Not OK

IDU type

RTN910

Rack 19 requirement

1+0/1+0

25m

38GHz

Far end site


Bearing (Degrees)
AGL Antenna Heights
(HMA) (m)

Actual /Future
IF Cable Length (m)
Freq. Band (GHz)

Leased Line:
Far end site
Leased line capacity
Leased type
(Ethernet/HSDL/SDH)
19 rack requirement
Nearest TC center
Distance to TC

Link1

Link 3

Link 4

Link2

Link 5

Link 6

Link3

Link 7

Link 8

Link4

links

Minimum LOS
Height on NE

Available free space


on NE tower

Minimum LOS
Height on FE/ FE
Tower type

Available free space


on FE tower

Link1 (THR0977)

8-11.5

7mT12

7-9

Link2 ()
Link3 ()

16. Obstacle
TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 9/32

Technical Site Survey Report

Type of
obstacle
-

Latitu
de
-

Longitu
de
-

Azimut
h
-

Distance
(m)
-

Photos are
taken from:

Latitud
e
35.606
880

Longitu
de
51.377
840

Azimut
h

Distance
(m)

Height(m)

18m

Building

Height(m)
-

Notes:
Nominal marked here with
Photos are taken from
Obstacle

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 10/32

Technical Site Survey Report


17. Photos

Panoramic View 0

Panoramic View 30
TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 11/32

Technical Site Survey Report

Panoramic View 60

Panoramic View 90

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 12/32

Technical Site Survey Report

Panoramic View 120

Panoramic View 150

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 13/32

Technical Site Survey Report

Panoramic View 180

Panoramic View 210


TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 14/32

Technical Site Survey Report

Panoramic View 240

Panoramic View 270


TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 15/32

Technical Site Survey Report

Panoramic View 300

Panoramic View 330


TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 16/32

Technical Site Survey Report


i-Beam BTS

Site
Location

SITE VIEW 1

Site
Location
SITE VIEW 2
TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 17/32

Technical Site Survey Report

ANTENNA VIEW A

ANTENNA VIEW B
TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 18/32

Technical Site Survey Report

ANTENNA VIEW C

Proposed BTS Location


TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 19/32

Technical Site Survey Report

Power supply

Proposed ACPDB Location


TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 20/32

Technical Site Survey Report

Proposed Tower/pole Location

Access Road
TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 21/32

Technical Site Survey Report

Access Road

Building Facing

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 22/32

Technical Site Survey Report

RF Access (Stairs)

Rooftop Door
TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 23/32

Technical Site Survey Report

Zoom Out LOS from THR0944A to THR0977 (Uplink photo /78)

Zoom In LOS from THR0944A to THR0977 (Uplink photo / 78)


TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 24/32

Technical Site Survey Report

Obstacle

Zoom Out LOS from THR0944A to THR0966 (Uplink photo /303) Blocked

Obstacle

Zoom In LOS from THR0944A to THR0966 (Uplink photo /303) Blocked


TAMIN Confidential Proprietary
Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 25/32

Technical Site Survey Report

18. General Comments

19. List of sketch drawings


1

Site Plan

Elevation Plan

Grounding Plan

20. Sketch drawings


Minimum requirements for information on sketch drawings
General outline (main road in relation to site location etc.)
Detailed access route through building
All measurements should be done.
Position of:
BTS/Shelter/equipment room
Antennas/microwave dishes
Source of power supply

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 26/32

Technical Site Survey Report


Earth rods (if needed)
Pole, mast, tower, special brackets
Routing of:
Feeder cables
Leased Line
Electrical cables
Down conductors (if needed)
Note that:
- All drawings must have basic dimensions/scale
- All plans must indicate the direction of North in relation to the building
- All drawings etc. must be titled (AutoCad)

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 27/32

Technical Site Survey Report


Site Layout Plan

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 28/32

Technical Site Survey Report


Elevation Plan

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 29/32

Technical Site Survey Report


Grounding Plan

TAMIN Confidential Proprietary


Document Number:TT_TSSR_THR0944_A _REV1_Atipooyesh_07- April - 2015
Page 30/32