Sunteți pe pagina 1din 6

Prasoon

Email :

singh_prasoon@yahoo.com

Small cell Lead(Reliance Jio)


Mobile : +91-789-561-3777
Sr. Mgr.

+91-971-629-9819

Career Summary
Career Summary

Having 11 Years working experience in Indian Telecom


Having in
11Network
Years working
experience
in Indian Telecom
Industry
Quality,
RF Optimization
&
Industry
in
Network
Quality,
RF
Optimization
& in
Small cell Planning(Deployment& Optimization)
Small cell Planning(Deployment&
Optimization) in
GSM,WCDMA
& LTE.
GSM,WCDMA & LTE.
Presently in Reliance Jio (Samsung & Airspan) working
inlead
Reliance
(Samsung
Airspan)
asPresently
Small cell
UPW Jio
responsible
for&Small
cell working
as
Small
cell
lead
UPW
responsible
for
Small
Planning (Deployment& Optimization) UPW. cell
Planning (Deployment& Optimization) UPW.
In Idea(NSN) Responsible for Delhi & Haryana Daily
In Idea(NSN)
Haryana
Monitoring
and Responsible
Optimizationfor
of Delhi
Major&KPIs
(DCR,Daily
CSSR,
Monitoring
and
Optimization
of
Major
KPIs
(DCR,
CSSR,
HOSR , Network availability ,RRC Setup success
rate
&
HOSR
,
Network
availability
,RRC
Setup
success
rate
&
RAB setup success rate)
RAB setup
success
rate)Survey & TRAI Reporting.
Taking
Care for
EMF Site
Taking
Care
for
EMF
SiteEricsson(2
Survey & TRAI
Reporting.
In Aircel looked after For
Circle
ROTN &
In
Aircel
looked
after
For
Ericsson(2
Circle
ROTN &
Chennai),NSN (2 Circles Delhi , Kolkata),Huawei(2
Chennai),NSN
(2
Circles
Delhi
,
Kolkata),Huawei(2
Circle AP & MH) & ZTE (3 Circle UPE,UPW & Gujarat).
Circle
AP & MH) &team
ZTE (3
Circle on
UPE,UPW
Gujarat).
Part
of management
working
strategy&planning
Part
of management
team working
on strategy
planning
for
growing
network optimization
business
in telecom
for
growing
network
optimization
business
in
telecom
market.
market.
Post
Swap Network performance comparison &
Post Swapand
Network
performance
monitoring
Parameter
Tuning comparison &
monitoring
and
Parameter
Providing Support to VendorsTuning
for required
Providing
Support
to
Vendors
required
Implementation & RF teams forfor
Network
Growth & RF
Implementation
&
RF
teams
for
Network
Growth & RF
optimization
activities
and
Experience
Summary
optimization
activities
and
Troubleshooting
of fault & complete operation &
Experience
Summary
Reliance
Jio of
asvarious
Small
cell&lead
(Sr.Mgr)(
Apr-2015
Troubleshooting
of fault
complete
operation
& to continue..)
maintenance
Reliance Jio of
asvarious
Small sites.
cell
lead (Sr.Mgr)( Apr-2015 to continue..)
maintenance
sites.
Idea Cellular Ltd. As Manager Network Quality (Jan-2014 to Apr-2015), Posted at Noida
Idea Cellular Ltd. As Manager Network Quality (Jan-2014 to Apr-2015), Posted at Noida
(Delhi).
(Delhi).
Aircel cellular Ltd. as Dyp. Manager (Technical) (Jan-2010 to Jan-2014), Posted at
Aircel cellular Ltd. as Dyp. Manager (Technical) (Jan-2010 to Jan-2014), Posted at
Gurgaon corporate.
Gurgaon corporate.
ZTE India Pvt Ltd. as RF Zonal Lead (Jul-2009 to Jan-2010), Posted at Meerut (AircelZTE India Pvt Ltd. as RF Zonal Lead (Jul-2009 to Jan-2010), Posted at Meerut (AircelZTE-UPW Project).
ZTE-UPW Project).
ADA Cell works as Sr. RF engg. (Mar-2009 to Jul-2009), Posted at Meerut (Aircel-ZTEADA Cell works as Sr. RF engg. (Mar-2009 to Jul-2009), Posted at Meerut (Aircel-ZTEUPW Project).
UPW Project).
Nokia Siemens Network Pvt. Ltd. As Network performance & Optimization Engg.
Nokia Siemens Network Pvt. Ltd. As Network performance & Optimization Engg.
(Nov-2007 to Mar-2009) -Posted at Asansol (Vodafone-West Bengal Circle).
(Nov-2007 to Mar-2009) -Posted at Asansol (Vodafone-West Bengal Circle).
Reliance Telecom Ltd. as Asst. Mgr. Quality (Feb-2007 to Nov-2007), Posted at Patna
Reliance Telecom Ltd. as Asst. Mgr. Quality (Feb-2007 to Nov-2007), Posted at Patna
(Bihar circle).
(Bihar circle).
Professional comtech pvt ltd. As RF Engg. (Jul 2005 to Feb 2007), Posted at (Patna
Professional comtech pvt ltd. As RF Engg. (Jul 2005 to Feb 2007), Posted at (Patna
Bihar (Airtel Project) and Meerut UPW (Hutch-Vodafone Project).
Bihar (Airtel Project) and Meerut UPW (Hutch-Vodafone Project).

Education Summary
Education
Summary
MBA - with First division MBA from Symbiosis Pune 2012

MBA - with First division MBA from Symbiosis Pune 2012


B-Tech with First division from Gurukul Kangri University 2005
B-Tech with First division from Gurukul Kangri University 2005
Present
Assignment:
Reliance
12th th
with First division Vidhya
MandirJio
Inter College Haridwar/ U.P. Board 2001
12
with First division Vidhya Mandir Inter College Haridwar/ U.P. Board 2001
th
10 thwith First divisionVidhya Mandir Inter College Haridwar/ U.P. Board 1999
10 with First divisionVidhya Mandir Inter College Haridwar/ U.P. Board 1999
Role: Small Cell Lead
Responsibilities:
Heading E2E Smart LTE Network Planning, Deployment & Optimization of Indoor, Outdoor Small Cell &
WIFI Network for Uttar Pradesh west Circle.
Scope Finalization of Green Field Smart LTE Outdoor/ Indoor/ IBS Network & its RF Planning.
BOQ Preparation and its validation in line with Backhaul Readiness & Deployment scenarios.
Small Cell Network Coverage & Capacity Planning, INFILL & Growth Scope finalization in line
with Capex, Business/Network Requirements
Outdoor Small Cell Planning on Difficult to acquire sites & Coverage patches, Deployment, Drive
Test and Optimization.
Indoor Small Cell/ IBS/ DAS/ Wi-Fi Network Planning (Plan, Design, BOQ E2E) & Deployment in
Major Hotspots, Buildings, Colleges, Hotels, Hospitals & Shopping complexes.
Analysis and recommending technical parameters to improve drive test KPI and BSS KPIs
Daily KPI Monitoring of LTE I/D, O/D Small cell & Wi-Fi Network of Uttar Pradesh west.
Ensuring 10X Network experience for enterprise, Government customers & public hotspots.

Achievements:
As Digital India Initiative, Lead Plan & Deployment of 500 outdoor small cells Sites & 700 Indoor
Small Cells to provide 10X LTE Coverage in major cities of Uttar Pradesh west Circle.
First WiFi of UPW, Mussoorie Mall road was made Wi Fi with 30 WIFI APs.
Oberoi Amarvilas & Hotel Trident covered by LTE small cells & WiFi services.
All 56 Jio Centers of Uttar Pradesh west are covered with Indoor Small Cells LTE Coverage.

Present Assignment: Idea cellular Ltd.


Role: Network Quality & Optimization Services.
Responsibilities:
Responsible for solution of All Performance related problems interference,Quality,Drop
calls,CSSR,HOSR, verify and improve frequency plans (BCCH, FH),Monitoring Database
parameters planning & Optimization
All TRAI Reporting(Drive Test Report, AT report, E1 report submission monthly as well as
quarterely,
Data Drive & QOS report Submission).
EMF Survey report on basis of New Onair & Upgraded Sites, with monitoring of same for other
operators as well.
Responsible for all Data related queries and Issues solution with Business Team as Circle
network Spoc .

Monitor & analyze the WCDMA/HSPA Radio Network Statistics on daily basis & Ensure the Radio
Network Performance as per the Desired Benchmarks KPIs (Accessibility, Retain ability, and
Mobility & Service Integrity)
Advise on radio planning and optimization process - set goals, create and review procedures,
suggest improvements and provide recommendations

Features, and Trials & Tuning


Monitoring the overall 3G network health & KPIs through performance reports.
Carry out detailed BSS parameterization audits, propose corrective actions and
parameterization fine tuning trials - access and signaling channels, dual band, CBCCH, FH,
MAIO, POC, HOC, AMR, HR, FR, GPRS/EDGE related parameters (Huawei)

2. Previous Assignment: Aircel cellular Ltd.


Role: Network Quality & RF Optimization Services.
Responsibilities:
Responsible for All Optimization related activities carried out PAN India circles.
Ensuring that the Performance of circles are running as per given Benchmarks
Network reports analysis and actions accordingly with circle & vendor team
Periodic Audit for Vendor NOC/ OMC for validating generated report
Regular Interaction with Circle team, handling escalations, follows up with vendor for critical &
long pending issues.
Support to circle to find out the problems and provide them solutions as per requirement.
Trend analysis and periodic management to check whether circles are Improving or degrading
Parameter
Optimization
of ZTEKPIs.
ZXG 10 BSS Systems
with respect
to their Network
Capacity
and
Coverage
Site Selection
by visiting
various siteand
locations.
Checking
Post Swap
Network
performance
comparison
& monitoring
Parameter
Tuning.Orientations,
Tilts
of
the
Antenna,
and
Type
of
the
Antenna
for
cellular
network.
Handling optimization of new sites and Giving solutions to circles in handling problems like Call

Analysis
of the KPI reports
for failure,
solving antenna
the problems
to Congestion,
Uplink Quality, down
drop, interference,
handover
tilting,related
competitive
Drive Test.
link
Quality
and
SDCCH
failure
&
congestion.
Providing Support to Implementation, Vendor & RF teams for Network Growth & RF optimization
Conduction
of Acceptance
testing
procedure,
whichoperation
includes &
submitting,
plots
C/I, RXQual,
activities and
troubleshooting
of fault
& complete
maintenance
ofof
various
sites.
RxLevel.
And call
testing for
measuring
CSSR.
WCDMA/GSM
RF Network
Planning,
which
includes Coverage, Capacity & Frequency Planning.

Handling all RF related customer complaints by checking / inspecting serving BTS site,
suggesting additional sites, if any and thereby optimizing the existing network so as to minimize
coverage holes.
3. Previous
Assignment: ZTE India Pvt Ltd.
Role: RF Zonal Lead. (Meerut Zone-UPW circle)
Responsibilities:

4. Previous Assignment: ADA CELL WORKS

Verification/Audit of Parameter DUMP, Analysis of Network Reports


Role: Sr. RF Optimization engg. (Meerut Zone-UPW circle)
Handled a Team of 2 RNO & 10 Drive test Engineers for Optimization of the Clusters of UP West.
Responsibilities:
Post Swap Network
performance
comparison
monitoring
Verification/Audit
of Parameter
DUMP,
Analysis&of
Network Reports
New GSM site
Rectification
ofplanning
Inconsistencies & discrepancies found in analysis of Dump/Database
Frequency
Planning
& Neighbor
Planning,
Parameter Optimization
of ZTE ZXG
10 BSSCoverage
Systems analysis and Speech Quality analysis
BSC Parenting,
Handled
a TeamLAC
of 2planning
RNO & 10 Drive test Engineers for Optimization of the Clusters of UP West.
Post Swap Network performance comparison & monitoring
New GSM site planning

5. Previous Assignment: Nokia Siemens Networks


Role: Network Performance & Optimization Engg. (Asansol Zone-West Bengal)
Responsibilities:
Handled a Team of 6 Drive test Engineers for Optimization of the Asansol Clusters of West
Bengal.
Responsible for Network KPI Maintenance of South Bengal Zone. (CSSR >98%, CSR > 95%,
HOSR >92%, DCR<2%)
2

Optimizing South Bengal Network with generating plans from Schema or making required
changes using MapInfo as per requirement.
Responsible for New Site creation
To analyze Nokia BSS performance reports on daily basis such as 208, 232, 60, 216, 204, 182,

BSC Alarm Log analysis and alarm decoding on daily basis of entire network.

6. Previous
Assignment:
Reliance
BSS Parameters
Audit: BSC, BTS,
TRX, HOC,Telecom
POC, ADCE.Ltd

Role: Asst. Mgr. Quality (Patna- Bihar)


Basic Cell Site parameters: To cross check the basic cell site parameters given to OMCR for
Responsibilities:
implementation and parameters implemented by OMCR.
Responsible to fine-tune BSS parameters for Hopping, Power Control, Handover etc.
OPTIMIZATION: -Includes making decision to make possible optimization to enhance the
Responsible
RF hardware
(GSM
Antenna,
Duplexer,
Amplifiers
etc)either
for optimum
performancetooffine-tune
network the
by study
of doctor
reports,
log files
and BSC/MSC
dump,
by
utilization
and
better
quality.
optimizing parameters or by
Responsible
for Customer
Representation
regarding
leveldump
optimization
part of concern.
ANALYSIS: -Includes
analysis
of network by
study of network
log files and
and to determine
the
causes of interference,
poor
quality, poor level, external interference, handover failure and
Optimization
of customer
issues.
congestion.
Review/perform frequency planning and traffic analysis and make recommendations to meet
Planningcapacity
of new sites
for neighbor
list, BSIC
frequency
ongoing
demands
and to ensure
theplanning,
best quality
of GSMplanning.
networks.

Planning of the
newBTS
sites
for coverage
improvement
and capacity
increase.
Remodeled
parameters,
channel
configuration,
antenna
orientations and tilts.
Network optimization
capacity
enhancement
and coverage and quality improvement.
Congestion
relief from by
highly
congested
sites.
Analyzing
related
Hanover
failure,
SDCCH
Congestion,
up
Monitoringnetwork
daily stats
and problems
optimizing(Call
the drop,
network
to increase
the
Call Setup
SuccessCall
rateset
and
failure,
etc.) rate
and recommending
relevantrate.
solutions.
Call
success
and Handover success
Analysis of Network performance and carrying out necessary optimization in the data base and
hardware side.
Attending to customer complaints and suggesting adequate solution to improve coverage, quality
and capacity problems.
Fault Management: Monitor, handle and resolve that may occur in the network elements (Radio,
Switching and GPRS equipment), through the use of existing Network Management Center (NMC)
platform.
Performance Management: Generate statistical reports periodically through the day, so as identify
cells and network elements with low performance.

7. Previous Assignment: Professional Comtech Pvt Ltd.


i) Role: RF Optimization Engineer on Nokia Project for Airtel Bihar and Jharkhand (from April 2006 to Feb
2007).
Responsibilities:
Radio Network Optimization of the network.
Monitoring Key Performance Identification (KPI) by means of SDCCH/TCH drop calls, call set up
success rate, handover success rate and congestion rate, and conducting Final acceptance Report
by means of statistics and drive test measurements.
Proposing solution for GSM performance improvement by parameter setting adjustments,
including power control parameters, hand over control parameters, cell definition parameters,
system information parameters. Confirming adjustments results by monitoring statistic and DT
data.
To find the causes of the call drops blocked calls, handover failures, excessive handovers, poor
quality, poor C/I, interferences etc.
Network-Optimization by drive tests, antenna tilts, antenna orientation changes and tuning the
Cell-RF Parameters.
Co-channel (C/I) and Adjacent channel (C/A) Interference analysis.
ii) Role: Worked as RF Optimization and DT Engineer in Nokia Project for HUTCH (U.P. west- Uttaranchal)
for Aircom International Pvt Ltd (from Jul-2005 to Apr- 2006).
Responsibilities:
Acceptance Testing (AT) of Existing and Swap sites in Network and Drive test Team Management.
2

Optimization of networks such as antenna verification, tilts, Azimuths, feeder swap.


Pre and Post AT RF drive test for Optimization of GSM networks (using AGILENT E-6474A, MX10 &
MAPINFO PROFFESTIONAL6.0/7.5, MAPINFO MAPX-5.0 tools).

proper frequency radiation. With TEMS after drive test.


Drive test optimization using TEMS ver. 5.0, Site survey NOKIA BTS.
Packages
& Tools Used:
NOKIA: Reflection of Nokia for Performance monitoring & reporting.
ZTE: Net-Numen use to Fetch the reports from ZTE system,
Huawei: MOS5200,MOS2000 (For Fetching Report),
Optimization Tool - CNO, NOP, NASTAR, PRS, DAMS( for Optimization of Network)
Post Processing Tools-Nemo Analyzer, X CAP
Plotting Tools: MAP Info v 7.5,MIPT, MCOM,
Planning Tool : Asset, Atoll
Drive Test Tools Nemo Outdoor 6 TEMS v 10.0.5, 8.0.3,Rising Benchmarking Tool, Agilent
Scanner, Agilent E6474A,MOTOROLA OMCR, Solaris, Neptune V 5.0(Enterprise),TEMS 5.0
investigation ,Map Info 6.5 for site and frequency planning, AGILENT Investigation for drive test
& Network optimization.
Reports- Net doctor - Report generator, Optimization Tool-Schema & Optima, Report Builder,
KPI & Report.

Carrier Highlights:
Awards and Recognition:

Personal Details:
Marital Status
Married
D.O.B
22nd Jun 1984
Alternate Email
Singh_prasoon@yahoo.com
Language Known
Hindi, English
Passport No. /PAN
K7272892/ APQPP2320D
Current Address
DELHI (INDIA)
Present Address
House no. G-2 ,
Gyan
Niketan,NearPVS Mall, Kuti
chowraha, Chanyakyapuri Road, Meerut, PIN250004,Uttarpradesh
Permanent Address
Shri Tikam singh,
Gurukul
Kangri, University
Chota Pariwar,
Haridwar
Uttaranchal, PIN
code
249404
Current CTC
13.10 Lac pa

Date:
2

Signature:
Prasoon

Got Two Times Bravo as recommended By Our


Aircel National Head and CTA respectively after
successful launch of 3G at West Bengal. And
being as a SPOC for all activities, problems &
their solutions running through out network from
2G swap of Ericsson by NSN to 3G launches.
Got Pat on the Back as recommended by Our
National CTO after successfully meeting the
presentation of Performance reports as per his
requirement.

Attended Trainings:
6 Days Training on 3G Network Planning &
Optimization at Aircel.
2 Days Edge GPRS Network Planning &
Optimization
6 Days Training at Mumbai DAKC Reliance
to understand How ZTE system works and
How we will be able to get the required
output or performance report from system
after Motorola swapped by ZTE.

S-ar putea să vă placă și