Sunteți pe pagina 1din 1

A

3 - 20 tor

Bend 3"

24"

C3/F3 = 9" x 24" 3 - 20 tor

2 - 20 tor
SEC AT 1-1
1

3 - 20 tor
RING: 8 tor @ 6" c/c
DOUBLE RING

PCC (1:4:8)

10 tor - 19 NOS

MIX M15 (1:2:4)


10 tor - 18 NOS

9" x 24" R.C.C COLUMN


10 - 20 tor
8 tor @ 6" c/c
DOUBLE RING
MIX M20 ( 1 : 1 : 3)

24"

SECTION AT AB
10 tor - 18 NOS

7'-9"
FOUNDATION PLAN FOR C3/F3

10 tor - 19 NOS

21"
21"
6"
7'-0"

1. THIS STRUCTURE IS DESIGNED


STILT+5 FLOORS

2. BEARING CAPACITY OF THE SOIL


IS TAKEN AS 4.TON/Sq.Mts
3. USE CEMENT CONCRETE OF
1:3) WITH HYSD
MIX M20 (1:12
BARS FOR COLUMNS.
4. USE CEMENT CONCRETE OF
MIX15 (1:2:4) WITH HYSD
BARS FOR FOOTINGS.
5. PROVIDE CLEAR COVER TO
STEEL OF 121 FOR COLUMNS
221 FOOTINGS.
6. LAP LENGTH SHOULD BE
42 (D=DIAMETER OF BAR) AND
LAPPING AT MID SPAN IS
PROHIBITED.
7. ALL MATERIALS SHELL
BE TESTED BEFORE CONCERNING.