Documente Academic
Documente Profesional
Documente Cultură
64130476
A-LAB
A - LAB
A - LAB
architecture.
A LABORATORY
LAB-SPACE
LAB-GROUPS
TOOL TOWERS
CREATIVE CHEMISTRY
These
incubators
for creativity, art and culture. The New School will give
for (X). While these anchors provide the tools the public
programmatic
tool
towers
A FLEXIBLE CONCEPT
are
CRAFT
STUDY
MEET
BUILD
SOCIALIZE
constraints.
ORGANIZE
CRAFT AREA
GODSBANEN
SITEPLAN
The massing of the school will continue the axiality and
1:500
1:2000
MIXED-USE BLOCK
5 FLOOR RESIDENTIAL OVER
1 FL COMMERCIAL/COMMUNITY BASE
ca. 9,000 m2
Site boundary
PARKING HOUSE
5-6 STORY
9000 m2
OPEN FOR
VEHICLE ACCESS
BIKE PARKING
LIBRARY
AUDITORIUM
ARCHI-TEGN
LAB-SPACE:
CRITIQUE
LAB-SPACE:
GALLERY
LAB-SPACE:
INFORMAL MEETING
WORKSHOP
COURTYARD
LAB-SPACE:
WORKSHOP
LAB-SPACE
EXHIBITION
WORKSHOP
CANTEEN
LAB-SPACE:
EXHIBITION
RECEPTION
MAIN ENTRY
ENTREPRENEURSHIP
CENTRE
A POROUS BORDER
A FUNCTIONAL SPINE
A CLOSE CONNECTION
manner.
WORKSHOP PAVILLION
WORKSHOP PAVILLION
WORKSHOP PAVILLION
WORKSHOP PAVILLION
WORKSHOP PAVILLION
WORKSHOP PAVILLION
Site boundary
THE TOOL TOWERS
Student Access
Flex Access (Exhibits, Events)
Always Public Access
STUDY
An Efficient Form
The orientation and form of the building is ideal
for providing daylight at all times of the day. The
CRAFT
LAB SPACE
MEET
0. &1. Auditorium
2. Large Classroom
3. Large Classroom
350 m2 (gross)
125 m2
125 m2
SECTION 1:500
CONNECT
10
15
20
A Flexible System
The facade incorporates passive shading
to manage interior light quality and energy
BUILD
0. Open Workshop:
350 m2 (gross)
1. Wood Workshop: 125 m2
2. Metal Workshop: 125 m2
3. Ceramics Lab: 125 m2
standards.
SOCIALIZE
0. Canteen
300 m2 (gross)
1. Student Center 125 m2
2. Student Kitchen 125 m2
3. Student Kitchen 125 m2
ORGANIZE
0. Reception:
350 m2 (gross)
1. External Relations /Intern Center: 250 m2
2. Administrative/Technical Staff:
250 m2
3. Administrative/Technical Staff:
250 m2
4. Academic Staff:
250 m2
ELEVATION 1:500
10
15
20